Powered by Deep Web Technologies
Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Correlating Dynamometer Testing to In-Use Fleet Results of Plug-In Hybrid Electric Vehicles  

SciTech Connect (OSTI)

Standard dynamometer test procedures are currently being developed to determine fuel and electrical energy consumption of plug-in hybrid vehicles (PHEV). To define a repeatable test procedure, assumptions were made about how PHEVs will be driven and charged. This study evaluates these assumptions by comparing results of PHEV dynamometer testing following proposed procedures to actual performance of PHEVs operating in the US Department of Energy’s (DOE) North American PHEV Demonstration fleet. Results show PHEVs in the fleet exhibit a wide range of energy consumption, which is not demonstrated in dynamometer testing. Sources of variation in performance are identified and examined.

John G. Smart; Sera White; Michael Duoba

2009-05-01T23:59:59.000Z

2

HEV Fleet Testing - 2010 Ford Fusion VIN:4699 - Fleet Testing...  

Broader source: Energy.gov (indexed) [DOE]

699 Fleet Testing Results To Date Operating Statistics Distance Driven: 73,490 Average Trip Distance: 10.8 mi Stop Time with Engine Idling: 13% Trip Type CityHighway: 86%...

3

Predictive tools for coolant development: An accelerated aging procedure for modeling fleet test results  

SciTech Connect (OSTI)

The objective of this study was to develop an accelerated aging test (AAT) for conventional and extended life coolants that will predict coolant composition and performance after 100,000 or more miles (160,930 km) of use. The procedure was developed by examining the effects of a series of cooling system metals, their surface area and the amount of each used, test temperature, glycol concentration, and test time on important chemical and physical properties of the test coolant. The chemical and physical properties evaluated included the accumulation of glycol degradation products, the depletion rate of active inhibitors, the pH drop, and the presence of corrosion products in solution. In addition, the test coolant performance was evaluated in ASTM D 1384 and D 4340. The effects of variation in the test procedure on the coolant were compared to actual coolant from extended duration fleet tests. The test procedure selected gave test coolant with composition, physical properties, and performance that compared favorably with the fleet test fluid. The test performance was validated by comparing the properties of a series fluids after this test to corresponding fluids removed from vehicles after extended use. An example of fluid development using this procedure is presented. Further areas of investigation are suggested. It is recommended that the general test procedure be considered for adoption as an ASTM test method for evaluation of the extended performance of fluids in automotive and light duty cooling systems.

Gershun, A.V.; Mercer, W.C. [Prestone Products Corp., Danbury, CT (United States)

1999-08-01T23:59:59.000Z

4

HEV Fleet Testing - 2010 Ford Fusion vin#4757  

Broader source: Energy.gov (indexed) [DOE]

757 Fleet Testing Results To Date Operating Statistics Distance Driven: 145,595 Average Trip Distance: 11.3 mi Stop Time with Engine Idling: 11% Trip Type CityHighway:...

5

Hybrid Electric Vehicle Fleet and Baseline Performance Testing  

SciTech Connect (OSTI)

The U.S. Department of Energy’s Advanced Vehicle Testing Activity (AVTA) conducts baseline performance and fleet testing of hybrid electric vehicles (HEV). To date, the AVTA has completed baseline performance testing on seven HEV models and accumulated 1.4 million fleet testing miles on 26 HEVs. The HEV models tested or in testing include: Toyota Gen I and Gen II Prius, and Highlander; Honda Insight, Civic and Accord; Chevrolet Silverado; Ford Escape; and Lexus RX 400h. The baseline performance testing includes dynamometer and closed track testing to document the HEV’s fuel economy (SAE J1634) and performance in a controlled environment. During fleet testing, two of each HEV model are driven to 160,000 miles per vehicle within 36 months, during which maintenance and repair events, and fuel use is recorded and used to compile life-cycle costs. At the conclusion of the 160,000 miles of fleet testing, the SAE J1634 tests are rerun and each HEV battery pack is tested. These AVTA testing activities are conducted by the Idaho National Laboratory, Electric Transportation Applications, and Exponent Failure Analysis Associates. This paper discusses the testing methods and results.

J. Francfort; D. Karner

2006-04-01T23:59:59.000Z

6

NREL: Transportation Research - Fleet Test and Evaluation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andData andFleet Test and Evaluation Photo of medium-duty truck with

7

Fleet Compliance Results for MY 2011/FY 2012 (Brochure)  

SciTech Connect (OSTI)

This annual report summarizes the compliance results of state and alternative fuel provider fleets covered by the Energy Policy Act of 1992 (EPAct) for model year 2011/fiscal year 2012.

Not Available

2013-02-01T23:59:59.000Z

8

NREL: Transportation Research - Hydraulic Hybrid Fleet Vehicle Testing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andData andFleet Test and Evaluation Photo ofHydraulic Hybrid Fleet

9

Heavy-duty fleet test evaluation of recycled engine coolant  

SciTech Connect (OSTI)

A 240,000 mile (386,232 km) fleet test was conducted to evaluate recycled engine coolant against factory fill coolant. The fleet consisted of 12 new Navistar International Model 9600 trucks equipped with Detroit Diesel Series 60 engines. Six of the trucks were drained and filled with the recycled engine coolant that had been recycled by a chemical treatment/filtration/reinhibited process. The other six test trucks contained the factory filled coolant. All the trucks followed the same maintenance practices which included the use of supplemental coolant additives. The trucks were equipped with metal specimen bundles. Metal specimen bundles and coolant samples were periodically removed to monitor the cooling system chemistry. A comparison of the solution chemistry and metal coupon corrosion patterns for the recycled and factory filled coolants is presented and discussed.

Woyciesjes, P.M.; Frost, R.A. [Prestone Products Corp., Danbury, CT (United States). Coolant Group

1999-08-01T23:59:59.000Z

10

Fuel Property, Emission Test, and Operability Results from a Fleet of Class 6 Vehicles Operating on Gas-to-Liquid Fuel and Catalyzed Diesel Particle Filters  

SciTech Connect (OSTI)

A fleet of six 2001 International Class 6 trucks operating in southern California was selected for an operability and emissions study using gas-to-liquid (GTL) fuel and catalyzed diesel particle filters (CDPF). Three vehicles were fueled with CARB specification diesel fuel and no emission control devices (current technology), and three vehicles were fueled with GTL fuel and retrofit with Johnson Matthey's CCRT diesel particulate filter. No engine modifications were made.

Alleman, T. L.; Eudy, L.; Miyasato, M.; Oshinuga, A.; Allison, S.; Corcoran, T.; Chatterjee, S.; Jacobs, T.; Cherrillo, R. A.; Clark, R.; Virrels, I.; Nine, R.; Wayne, S.; Lansing, R.

2005-11-01T23:59:59.000Z

11

NREL: Transportation Research - Fleet Test and Evaluation Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andData andFleet Test and Evaluation Photo of medium-duty truck

12

NREL: Transportation Research - Hybrid Electric Fleet Vehicle Testing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andData andFleet Test and Evaluation Photo of

13

HEV Fleet Testing Advanced Vehicle Testing Activities - 2010...  

Broader source: Energy.gov (indexed) [DOE]

Testing Advanced Vehicle Testing Activity Maintenance Sheet for 2010 Ford Fusion VIN 3FADP0L32AR194699 Date Mileage Description Cost 1012009 5915 Changed oil and filter 28.77...

14

Fleet Compliance Results for MY 2010/FY 2011, EPAct Alternative Fuel Transportation Program: State and Alternative Fuel Provider Fleet Compliance Annual Report (Brochure)  

SciTech Connect (OSTI)

This annual report summarizes the compliance results of state and alternative fuel provider fleets covered by the Energy Policy Act of 1992 (EPAct) for model year 2010/fiscal year 2011. The U.S. Department of Energy (DOE) regulates covered state and alternative fuel provider (SFP) fleets under the Energy Policy Act of 1992 (EPAct), as amended. For model year (MY) 2010, the compliance rate for the 2911 covered SFP fleets was 100%. Fleets used either Standard Compliance or Alternative Compliance. The 279 fleets that used Standard Compliance exceeded their aggregate MY 2010 acquisition requirements by 61%. The 12 covered fleets that complied using Alternative Compliance exceeded their aggregate MY 2010 petroleum-use-reduction requirements by 89%. Overall, DOE saw modest decreases from MY 2009 in biodiesel fuel use credits earned and in the number of light-duty vehicles (LDVs) acquired. Compared to years before MY 2009, these rates were far lower. Because covered fleets acquired fewer new vehicles overall in MY 2010, the requirement for alternative fuel vehicles (AFVs), which is proportional to new acquisitions, also dropped.

Not Available

2012-03-01T23:59:59.000Z

15

EPAct Alternative Fuel Transportation Program: State and Alternative Fuel Provider Fleet Compliance Annual Report, Fleet Compliance Results for MY 2009/FY 2010 (Brochure)  

SciTech Connect (OSTI)

This annual report summarizes the compliance results of state and alternative fuel provider fleets covered by the Energy Policy Act of 1992 (EPAct) for model year 2009/fiscal year 2010.

Not Available

2010-12-01T23:59:59.000Z

16

U.S. Department of Energy FreedomCAR and Vehicle Technologies Program Advanced Vehicle Testing Activity Federal Fleet Use of Electric Vehicles  

SciTech Connect (OSTI)

Per Executive Order 13031, “Federal Alternative Fueled Vehicle Leadership,” the U.S. Department of Energy’s (DOE’s) Advanced Vehicle Testing Activity provided $998,300 in incremental funding to support the deployment of 220 electric vehicles in 36 Federal fleets. The 145 electric Ford Ranger pickups and 75 electric Chrysler EPIC (Electric Powered Interurban Commuter) minivans were operated in 14 states and the District of Columbia. The 220 vehicles were driven an estimated average of 700,000 miles annually. The annual estimated use of the 220 electric vehicles contributed to 39,000 fewer gallons of petroleum being used by Federal fleets and the reduction in emissions of 1,450 pounds of smog-forming pollution. Numerous attempts were made to obtain information from all 36 fleets. Information responses were received from 25 fleets (69% response rate), as some Federal fleet personnel that were originally involved with the Incremental Funding Project were transferred, retired, or simply could not be found. In addition, many of the Department of Defense fleets indicated that they were supporting operations in Iraq and unable to provide information for the foreseeable future. It should be noted that the opinions of the 25 fleets is based on operating 179 of the 220 electric vehicles (81% response rate). The data from the 25 fleets is summarized in this report. Twenty-two of the 25 fleets reported numerous problems with the vehicles, including mechanical, traction battery, and charging problems. Some of these problems, however, may have resulted from attempting to operate the vehicles beyond their capabilities. The majority of fleets reported that most of the vehicles were driven by numerous drivers each week, with most vehicles used for numerous trips per day. The vehicles were driven on average from 4 to 50 miles per day on a single charge. However, the majority of the fleets reported needing gasoline vehicles for missions beyond the capabilities of the electric vehicles, usually because of range limitations. Twelve fleets reported experiencing at least one charge depletion while driving, whereas nine fleets reported not having this problem. Twenty-four of the 25 fleets responded that the electric vehicles were easy to use and 22 fleets indicated that the payload was adequate. Thirteen fleets reported charging problems; eleven fleets reported no charging problems. Nine fleets reported the vehicles broke down while driving; 14 fleets reported no onroad breakdowns. Some of the breakdowns while driving, however, appear to include normal flat tires and idiot lights coming on. In spite of operation and charging problems, 59% of the fleets responded that they were satisfied, very satisfied, or extremely satisfied with the performance of the electric vehicles. As of September 2003, 74 of the electric vehicles were still being used and 107 had been returned to the manufacturers because the leases had concluded.

Mindy Kirpatrick; J. E. Francfort

2003-11-01T23:59:59.000Z

17

NREL: Transportation Research - Alternative Fuel Fleet Vehicle Testing  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andData and ResourcesOtherForecastingAlternative Fuel Fleet Vehicle

18

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA White Sands Test Facility  

SciTech Connect (OSTI)

This report focuses on the NASA White Sands Test Facility (WSTF) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

Stephen Schey; Jim Francfort

2014-10-01T23:59:59.000Z

19

Alternative fuel vehicles for the state fleets: Results of the 5-year planning process  

SciTech Connect (OSTI)

This report documents the first attempt by the Department of Energy (DOE) to work with states to prepare five-year Alternative Fuel Vehicle (AFV) acquisition plans to identify alternative fuels and vehicles that they are planning on or would like to acquire. The DOE Regional Support Offices (RSOs) met with representatives from the states in their regions and assisted in the preparation of the plans. These plans will be used in conjunction with previously gathered Federal five-year plans to encourage Original Equipment Manufacturers (OEMs) to expand the variety of AFVs produced, reduce the incremental cost of AFVs, and to encourage fuel suppliers to expand the alternative fuel infrastructure and alternative fuel availability. By identifying the needs and requirements of state fleets, DOE can begin to describe the specific nature of the future state fleets, and establish a defined market for OEMs and fuel suppliers. DOE initiated the development and collection of the state five-year plans before the signing of the Energy Policy Act, to raise the awareness of states that they will be required by law to acquire AFVs. As a result, several states that had no AFV acquisition plan when queried have developed or are in the process of developing plans. The DOE and its RSOs are still working with the states to develop and refine acquisition plans, and this report should be treated as documentation of work in progress.

Not Available

1993-05-01T23:59:59.000Z

20

Working With the Federal Fleets (Presentation)  

SciTech Connect (OSTI)

Presentation about federal fleet data, working with the federal government, and results from a survey of Clean Cities coordinators about their experiences with regulated fleets.

Daley, R.

2010-10-25T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Fleet test evaluations of an automotive and medium-duty truck coolant filter conditioner  

SciTech Connect (OSTI)

The use of coolant filtration and supplemental coolant additives (SCA) to replenish depleted protective chemistry has been applied in the heavy duty diesel arena for many years. Some filtration of coolant and SCA usage in light gasoline engine and automotive diesel engine vehicles has taken place using off-board equipment to filter and recondition coolant. As concerns about the environment have increased, disposal of spent coolant that is replaced on a scheduled basis is a burden on fleets as well as individuals. In addition, as the efforts by vehicle manufacturers to extend or eliminate routine service intervals of vehicle systems increase, the use of an on-board system has become more attractive. A number of filtration/conditioning designs have been developed for light and medium duty use and have been on field tests for over a year. These field tests are described and reported, along with background on the filter design and chemistry package used. Field testing included: low and high mileage vehicles; newer and older vehicles; well and poorly maintained vehicles; and an assessment of the possibility of overcharging of the coolant chemistry.

Wright, A.B. [AlliedSignal Filters and Spark Plugs, Perrysburg, OH (United States)

1999-08-01T23:59:59.000Z

22

Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Test Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.

K. B. Campbell

2002-09-01T23:59:59.000Z

23

E-Print Network 3.0 - actual car fleet Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

potential for misidentifying the ... Source: Denver, University of - Fuel Efficiency Automobile Test Data Center Collection: Energy Storage, Conversion and Utilization 15 Smog...

24

Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, Nevada  

SciTech Connect (OSTI)

The Area 12 Fleet Operations Steam Cleaning site is located in the southeast portion of the Area 12 Camp at the Nevada Test Site (Figure 1). This site is identified in the Federal Facility Agreement and Consent Order (FFACO, 1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 23, 2001. Because of questionable representativeness and precision of the results, the site was resampled on June 12, 2001. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the December 1997 Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1997). If after six years the rate of degradation appears to be so slow that the greatest concentration of total petroleum hydrocarbons (TPH) present at the site would not decay within 30 years of the site closure, the site will be reevaluated with consideration to enriching the impacted soil at the site to enhance the degradation process. A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report, samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in TPH concentrations at the site. Sampling results from 2000 revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, the data results from 2000 were not directly correlated with previous results. Post-closure monitoring activities for 2001 consisted of the following: Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2); Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]); Site inspection to evaluate the condition of the fencing and signs; and Preparation and submittal of the Post-Closure Monitoring Report.

A. T. Urbon

2001-08-01T23:59:59.000Z

25

CleanFleet. Final report: Volume 8, fleet economics  

SciTech Connect (OSTI)

The costs that face a fleet operator in implementing alternative motor fuels into fleet operations are examined. Five alternatives studied in the CleanFleet project are considered for choice of fuel: compressed natural gas, propane gas, California Phase 2 reformulated gasoline, M-85, and electricity. The cost assessment is built upon a list of thirteen cost factors grouped into the three categories: infrastructure costs, vehicle owning costs, and operating costs. Applicable taxes are included. A commonly used spreadsheet was adapted as a cost assessment tool. This tool was used in a case study to estimate potential costs to a typical fleet operator in package delivery service in the 1996 time frame. In addition, because electric cargo vans are unlikely to be available for the 1996 model year from original equipment manufacturers, the case study was extended to the 1998 time frame for the electric vans. Results of the case study are presented in cents per mile of vehicle travel for the fleet. Several options available to the fleet for implementing the fuels are examined.

NONE

1995-12-01T23:59:59.000Z

26

Results Conclusions & Future Work TRADEOFF ANALYSIS OF Design of a Green Campus Motor Fleet Decision Support System  

E-Print Network [OSTI]

for Federal Fleet Performance. Additional reporting requirements. Community Clean local environment Additional Emissions ? Note Status Quo Yes $65100 Yes Yes Not on track to meet DOT requirements LSEV's Yes $5 the power to affect industry and increase the availability of alternative fuels 30% reduction in petroleum

27

Addendum to the Closure Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Discharge Area, Nevada Test Site, Revision 0  

SciTech Connect (OSTI)

This document constitutes an addendum to the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Discharge Area Nevada Test Site, December 1997 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-19-01, A12 Fleet Ops Steam Cleaning Efflu. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

Grant Evenson

2009-05-01T23:59:59.000Z

28

Commercial Fleet Demand for Alternative-Fuel Vehicles in California  

E-Print Network [OSTI]

Precursors of demand for alternative-fuel vehicles: resultsFLEET DEMAND FOR ALTERNATIVE-FUEL VEHICLES IN CALIFORNIA*Abstract—Fleet demand for alternative-fuel vehicles (‘AFVs’

Golob, Thomas F; Torous, Jane; Bradley, Mark; Brownstone, David; Crane, Soheila Soltani; Bunch, David S

1996-01-01T23:59:59.000Z

29

Fleet Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Fleet management includes commercial and agency owned motor vehicles such as cars, vans, trucks, and buses. Fleet (vehicle) management at the headquarters level includes a range of...

30

AVTA: 2013 Ford C-Max Energi Fleet  

Broader source: Energy.gov [DOE]

VTO's National Laboratories have tested and collected both dynamometer and fleet data for the Ford CMAX Energi (a plug-in hybrid electric vehicle).

31

NREL: Vehicles and Fuels Research - Hydraulic Hybrid Fleet Vehicle...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hydraulic Hybrid Fleet Vehicle Testing How Hydraulic Hybrid Vehicles Work Hydraulic hybrid systems can capture up to 70% of the kinetic energy that would otherwise be lost during...

32

NREL: Vehicles and Fuels Research - Hybrid Electric Fleet Vehicle...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hybrid Electric Fleet Vehicle Testing How Hybrid Electric Vehicles Work Hybrid electric vehicles combine a primary power source, an energy storage system, and an electric motor to...

33

Organic Separation Test Results  

SciTech Connect (OSTI)

Separable organics have been defined as “those organic compounds of very limited solubility in the bulk waste and that can form a separate liquid phase or layer” (Smalley and Nguyen 2013), and result from three main solvent extraction processes: U Plant Uranium Recovery Process, B Plant Waste Fractionation Process, and Plutonium Uranium Extraction (PUREX) Process. The primary organic solvents associated with tank solids are TBP, D2EHPA, and NPH. There is concern that, while this organic material is bound to the sludge particles as it is stored in the tanks, waste feed delivery activities, specifically transfer pump and mixer pump operations, could cause the organics to form a separated layer in the tank farms feed tank. Therefore, Washington River Protection Solutions (WRPS) is experimentally evaluating the potential of organic solvents separating from the tank solids (sludge) during waste feed delivery activities, specifically the waste mixing and transfer processes. Given the Hanford Tank Waste Treatment and Immobilization Plant (WTP) waste acceptance criteria per the Waste Feed Acceptance Criteria document (24590-WTP-RPT-MGT-11-014) that there is to be “no visible layer” of separable organics in the waste feed, this would result in the batch being unacceptable to transfer to WTP. This study is of particular importance to WRPS because of these WTP requirements.

Russell, Renee L.; Rinehart, Donald E.; Peterson, Reid A.

2014-09-22T23:59:59.000Z

34

Fleet DNA (Presentation)  

SciTech Connect (OSTI)

The Fleet DNA project objectives include capturing and quantifying drive cycle and technology variation for the multitude of medium- and heavy-duty vocations; providing a common data storage warehouse for medium- and heavy-duty vehicle fleet data across DOE activities and laboratories; and integrating existing DOE tools, models, and analyses to provide data-driven decision making capabilities. Fleet DNA advantages include: for Government - providing in-use data for standard drive cycle development, R&D, tech targets, and rule making; for OEMs - real-world usage datasets provide concrete examples of customer use profiles; for fleets - vocational datasets help illustrate how to maximize return on technology investments; for Funding Agencies - ways are revealed to optimize the impact of financial incentive offers; and for researchers -a data source is provided for modeling and simulation.

Walkokwicz, K.; Duran, A.

2014-06-01T23:59:59.000Z

35

Executive Fleet Vehicles Report  

Broader source: Energy.gov [DOE]

On May 24, 2011, the President issued a Presidential Memorandum on Federal Fleet Performance.  In accordance with Section 1 (b) of the Presidential Memorandum and pursuant to Federal Management...

36

Resources for Fleet Managers  

Broader source: Energy.gov [DOE]

Fleet managers will benefit from the lower fuel costs, more reliable fuel prices, and lower emissions that come from using alternative fuels and advanced technologies made possible through the work...

37

AVTA: 2013 Ford C-Max Energi Fleet PHEV Testing Results | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartment of Energy 601Department of Energy Toyota Prius

38

Fleet DNA Project - Data Dictionary for Public Download Files  

SciTech Connect (OSTI)

Reference document for the Fleet DNA results data shared on the NREL public website. The document includes variable definitions and descriptions to assist users in understanding data.

Duran, A.; Burton, E.; Kelly, K.; Walkowicz, K.

2014-09-01T23:59:59.000Z

39

Controlled Hydrogen Fleet and Infrastructure Demonstration and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Solicitation Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project...

40

National Clean Fleets Partnership (Fact Sheet)  

SciTech Connect (OSTI)

Describes Clean Cities' National Clean Fleets Partnership, an initiative that helps large private fleets reduce petroleum use.

Not Available

2011-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Summary of Test Results for the Interagency Field Test &Evaluation...  

Broader source: Energy.gov (indexed) [DOE]

Summary of Test Results for the Interagency Field Test &Evaluation of Wind Turbine - Radar Interference Mitigation Technologies Summary of Test Results for the Interagency Field...

42

RSG Deployment Case Testing Results  

SciTech Connect (OSTI)

The RSG deployment case design is centered on taking the RSG system and producing a transport case that houses the RSG in a safe and controlled manner for transport. The transport case was driven by two conflicting constraints, first that the case be as light as possible, and second that it meet a stringent list of Military Specified requirements. The design team worked to extract every bit of weight from the design while striving to meet the rigorous Mil-Spec constraints. In the end compromises were made primarily on the specification side to control the overall weight of the transport case. This report outlines the case testing results.

Owsley, Stanley L.; Dodson, Michael G.; Hatchell, Brian K.; Seim, Thomas A.; Alexander, David L.; Hawthorne, Woodrow T.

2005-09-01T23:59:59.000Z

43

Julie Crenshaw Van Fleet  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7January 2015JimJulie Crenshaw Van Fleet 127 S.

44

Cask fleet operations study  

SciTech Connect (OSTI)

The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system.

Not Available

1988-01-01T23:59:59.000Z

45

CleanFleet. Final report: Volume 1, summary  

SciTech Connect (OSTI)

The South Coast Alternative Fuels Demonstration, called CleanFleet, was conducted in the Los Angeles area from April 1992 through September 1994. The demonstration consisted of 111 package delivery vans operating on five alternative fuels and the control fuel, unleaded gasoline. The alternative fuels were propane gas, compressed natural gas, California Phase 2 reformulated gasoline (RFG), methanol with 15 percent RFG (called M-85), and electricity. This volume of the eight volume CleanFleet final report is a summary of the project design and results of the analysis of data collected during the demonstration on vehicle maintenance and durability, fuel economy, employee attitudes, safety and occupational hygiene, emissions, and fleet economics.

NONE

1995-12-01T23:59:59.000Z

46

2011 Hyundai Sonata 3539 - Hybrid Electric Vehicle Battery Test Results  

SciTech Connect (OSTI)

The U.S. Department of Energy’s Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles, including testing hybrid electric vehicle batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on-road fleet testing. This report documents battery testing performed for the 2011 Hyundai Sonata Hybrid (VIN KMHEC4A47BA003539). Battery testing was performed by Intertek Testing Services NA. The Idaho National Laboratory and Intertek collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Program of the U.S. Department of Energy.

Matthew Shirk; Tyler Gray; Jeffrey Wishart

2014-09-01T23:59:59.000Z

47

Controlled Hydrogen Fleet and Infrastructure Analysis (Presentation)  

SciTech Connect (OSTI)

This presentation summarizes controlled hydrogen fleet & infrastructure analysis undertaken for the DOE Fuel Cell Technologies Program.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2010-06-10T23:59:59.000Z

48

Fleet assessment for opportunities to effectively deploy light duty alternative fuel vehicles  

SciTech Connect (OSTI)

The City of Detroit conducted an initial program to assess the potential for substitution of vehicles currently in operation with alternative fuel vehicles. A key task involved the development of an operating profile of the participant light truck and van fleets involved in the study. To do this a survey of operators of light duty trucks and vans within the project participant fleets was conducted. These survey results were analyzed to define the potential for substitution of conventional vehicles with alternate fuel vehicles with alternate fuel vehicles and to identify candidates for participation in the Mini-Demonstration portion of the project. The test program involved the deployment of an electric van (two GM Griffon Electric Vans provided by Detroit Edison) at seven Mini-Demonstration sites for a period of four weeks each for test and evaluation. The Technical Work Group then analyzed vehicle performance data and used a questionnaire to obtain impressions and attitudes of the users toward the acceptability of the electric van. The Technical Work Group (TWG) and Management Assessment Group (MAG) then prepared recommendations and an implementation plan to develop further information aimed toward eventual expanded deployment of alternative fuel vehicles within project participant light duty fleets. The MAG concluded that the study had been beneficial in collecting and developing important quantitative information, introducing a set of public fleet managers to alternative fuel vehicle opportunities and features, and had provided specific experience with the Griffon van which provided some indications of requirements in such vehicles if they are to be a normal part of public fleet operations. These included the need for some increase of the mileage range of the Griffon, an improvement in the ride and handling of the Griffon, and several minor'' difficulties experienced with malfunctioning or inconvenient characteristics of the Griffon equipment. 25 figs., 1 tab.

Not Available

1990-05-01T23:59:59.000Z

49

Fleet DNA Project (Fact Sheet)  

SciTech Connect (OSTI)

The Fleet DNA Project - designed by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) in partnership with Oak Ridge National Laboratory - aims to accelerate the evolution of advanced vehicle development and support the strategic deployment of market-ready technologies that reduce costs, fuel consumption, and emissions. At the heart of the Fleet DNA Project is a clearinghouse of medium- and heavy-duty commercial fleet transportation data for optimizing the design of advanced vehicle technologies or for selecting a given technology to invest in. An easy-to-access online database will help vehicle manufacturers and fleets understand the broad operational range for many of today's commercial vehicle vocations.

Not Available

2012-10-01T23:59:59.000Z

50

2011 Hyundai Sonata 4932 - Hybrid Electric Vehicle Battery Test Results  

SciTech Connect (OSTI)

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing the HEV batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on-road fleet testing. This report documents battery testing performed for the 2011 Hyundai Sonata Hybrid HEV (VIN KMHEC4A43BA004932). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the AVTA for the Vehicle Technologies Program of the DOE.

Tyler Gray; Matthew Shirk; Jeffrey Wishart

2013-07-01T23:59:59.000Z

51

AVTA: Quantum Escape PHEV Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a Quantum Escape PHEV 2010, an experimental model not currently for sale. The baseline performance testing provides a point of comparison for the other test results. Taken together, these reports give an overall view of how this vehicle functions under extensive testing. This research was conducted by Idaho National Laboratory.

52

AVTA: Honda Civic HEV 2013 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2013 Honda Civic hybrid electric vehicle. The baseline performance testing provides a point of comparison for the other test results. Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

53

AVTA: Honda CRZ HEV 2011 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2011 Honda CRZ hybrid electric vehicle. The baseline performance testing provides a point of comparison for the other test results. Taken together, these reports give an overall view of how this vehicle functions under extensive testing. This research was conducted by Idaho National Laboratory.

54

AVTA: Mercedes Benz HEV 2010 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2010 Mercedes Benz hybrid-electric vehicle. The baseline performance testing provides a point of comparison for the other test results. Taken together, these reports give an overall view of how this vehicle functions under extensive testing. This research was conducted by Idaho National Laboratory.

55

AVTA: 2011 Chevrolet Volt Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a Chevrolet Volt 2011. The baseline performance testing provides a point of comparison for the other test results. Taken together, these reports give an overall view of how this vehicle functions under extensive testing. This research was conducted by Idaho National Laboratory.

56

Vehicle Fleet Policy Responsible Administrative Unit: Finance & Administration  

E-Print Network [OSTI]

Vehicle Fleet Policy Responsible Administrative Unit: Finance & Administration Policy Contact, and established campus vehicle fleet service under Facilities Management operations. The purpose of the fleet vehicles. This policy is applicable to the entire Mines fleet, which includes department vehicles. 2

57

Fleet Briefings | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember U.S.Financial Statement:Fire2Fleet Briefings Fleet

58

AVTA: Hyundai Sonata HEV 2011 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2011 Hyundai Sonata hybrid electric vehicle. Baseline data, which provides a point of comparison for the other test results, was collected at two different research laboratories. Baseline and other data collected at Idaho National Laboratory is in the attached documents. Baseline and battery testing data collected at Argonne National Laboratory is available in summary and CSV form on the Argonne Downloadable Dynometer Database site (http://www.transportation.anl.gov/D3/2011_hyundai_sonata_hybrid.html). Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

59

AVTA: Ford Fusion HEV 2010 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2010 Ford Fusion hybrid-electric vehicle. Baseline data, which provides a point of comparison for the other test results, was collected at two different research laboratories. Baseline and other data collected at Idaho National Laboratory is in the attached documents. Baseline and battery testing data collected at Argonne National Laboratory is available in summary and CSV form on the Argonne Downloadable Dynometer Database site (http://www.transportation.anl.gov/D3/2010_fusion_hybrid.html). Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

60

Bus Fleet Type and Age Replacement Optimization: A case study utilizing King County Metro fleet data  

E-Print Network [OSTI]

1 Bus Fleet Type and Age Replacement Optimization: A case study utilizing King County Metro fleet and a hybrid bus. Employing real-world bus fleet data from King County Metro (Washington State, USA) multiple multiple fleets of buses with different types of buses serving different routes. For example, King County

Bertini, Robert L.

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

National Clean Fleets Partnership (Fact Sheet)  

SciTech Connect (OSTI)

Clean Cities' National Clean Fleets Partnership establishes strategic alliances with large fleets to help them explore and adopt alternative fuels and fuel economy measures to cut petroleum use. The initiative leverages the strength of nearly 100 Clean Cities coalitions, nearly 18,000 stakeholders, and more than 20 years of experience. It provides fleets with top-level support, technical assistance, robust tools and resources, and public acknowledgement to help meet and celebrate fleets' petroleum-use reductions.

Not Available

2014-01-01T23:59:59.000Z

62

Controlled Hydrogen Fleet and Infrastructure Demonstration and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3veenstra.pdf More Documents & Publications Technology Validation Controlled Hydrogen Fleet & Infrastructure Analysis HYDROGEN TO THE HIGHWAYS...

63

AVTA: Honda Insight HEV 2010 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2010 Honda Insight hybrid-electric vehicle. Baseline and other data collected at Idaho National Laboratory is in the attached documents. Baseline and battery testing data collected at Argonne National Laboratory is available in summary and CSV form on the Argonne Downloadable Dynometer Database site (http://www.transportation.anl.gov/D3/2010_honda_insight.html). Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

64

AVTA: Toyota Prius PHEV 2013 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a Toyota Prius PHEV 2013. Baseline and battery testing data collected at Argonne National Laboratory is available in summary and CSV form on the Argonne Downloadable Dynometer Database site (http://www.transportation.anl.gov/D3/2013_toyota_prius_phev.html). The reports for download here are based on research done at Idaho National Laboratory. Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

65

AVTA: Chevrolet Volt 2013 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2013 Chevrolet Volt. Baseline and battery testing data collected at Argonne National Laboratory is available in summary and CSV form on the Argonne Downloadable Dynometer Database site (http://www.transportation.anl.gov/D3/2013_chevy_volt_phev.html). The reports for download here are based on research done at Idaho National Laboratory. Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

66

Fleet test evaluation of fully formulated heavy-duty coolant technology maintained with a delayed-release filter compared with coolant inhibited with a nitrited organic acid technology: An interim report  

SciTech Connect (OSTI)

This paper is a controlled extended service interval (ESI) study of the comparative behaviors of a nitrite/borate/low-silicate, low total dissolved solids (TDS) coolant maintained with delayed-release filters, and an organic acid inhibited coolant technology in heavy-duty engines. It reports both laboratory and fleet test data from 66 trucks, powered with different makes of heavy-duty diesel engines. The engines were cooled with three different types of inhibitors and two different glycol base (ethylene glycol and propylene glycol) coolants for an initial period exceeding two years and 500,000 km (300,000 miles). The data reported include chemical depletion rates, periodic coolant chemical analyses, and engine/cooling system reliability experience. The ongoing test will continue for approximately five years and a 1.6 million km (1 million miles) duration. Thirteen trucks were retained as controls, operating with ASTM D 4985 specification (GM-6038 type) coolant maintained with a standard ASTM D 57542 supplemental coolant additive (SCA). Engines produced by Caterpillar, Detroit Diesel Corp., Cummins Engine Co., and Mack Trucks are included in the test mix.

Aroyan, S.S.; Eaton, E.R. [Penray Companies, Inc., Elk Grove Village, IL (United States). Technical Service

1999-08-01T23:59:59.000Z

67

National Clean Fleets Partnership (Fact Sheet)  

SciTech Connect (OSTI)

Provides an overview of Clean Cities National Clean Fleets Partnership (NCFP). The NCFP is open to large private-sector companies that have fleet operations in multiple states. Companies that join the partnership receive customized assistance to reduce petroleum use through increased efficiency and use of alternative fuels. This initiative provides fleets with specialized resources, expertise, and support to successfully incorporate alternative fuels and fuel-saving measures into their operations. The National Clean Fleets Partnership builds on the established success of DOE's Clean Cities program, which reduces petroleum consumption at the community level through a nationwide network of coalitions that work with local stakeholders. Developed with input from fleet managers, industry representatives, and Clean Cities coordinators, the National Clean Fleets Partnership goes one step further by working with large private-sector fleets.

Not Available

2012-01-01T23:59:59.000Z

68

Cone Penetrometer N Factor Determination Testing Results  

SciTech Connect (OSTI)

This document contains the results of testing activities to determine the empirical 'N Factor' for the cone penetrometer in kaolin clay simulant. The N Factor is used to releate resistance measurements taken with the cone penetrometer to shear strength.

Follett, Jordan R.

2014-03-05T23:59:59.000Z

69

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Golden Gate National Recreation Area  

SciTech Connect (OSTI)

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy's Idaho National Laboratory, is the lead laboratory for U.S. Department of Energy Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (ITSNA) to collect data on federal fleet operations as part of the Advanced Vehicle Testing Activity's Federal Fleet Vehicle Data Logging and Characterization study. The Advanced Vehicle Testing Activity study seeks to collect data to validate the utilization of advanced electric drive vehicle transportation. This report focuses on the Golden Gate National Recreation Area (GGNRA) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies' fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (PHEV) (collectively PEVs) can fulfill the mission requirements. GGNRA identified 182 vehicles in its fleet, which are under the management of the U.S. General Services Administration. Fleet vehicle mission categories are defined in Section 4, and while the GGNRA vehicles conduct many different missions, only two (i.e., support and law enforcement missions) were selected by agency management to be part of this fleet evaluation. The selected vehicles included sedans, trucks, and sport-utility vehicles. This report will show that battery electric vehicles and/or PHEVs are capable of performing the required missions and providing an alternative vehicle for support vehicles and PHEVs provide the same for law enforcement, because each has a sufficient range for individual trips and time is available each day for charging to accommodate multiple trips per day. These charging events could occur at the vehicle home base, high-use work areas, or intermediately along routes that the vehicles frequently travel. Replacement of vehicles in the current fleet would result in significant reductions in the emission of greenhouse gases and petroleum use, while also reducing fuel costs. The San Francisco Bay Area is a leader in the adoption of PEVs in the United States. PEV charging stations, or more appropriately identified as electric vehicle supply equipment, located on the GGNRA facility would be a benefit for both GGNRA fleets and general public use. Fleet drivers and park visitors operating privately owned PEVs benefit by using the charging infrastructure. ITSNA recommends location analysis of the GGNRA site to identify the optimal placement of the electric vehicle supply equipment station. ITSNA recognizes the support of Idaho National Laboratory and ICF International for their efforts to initiate communication with the National Parks Service and GGNRA for participation in the study. ITSNA is pleased to provide this report and is encouraged by the high interest and support from the National Park Service and GGNRA personnel.

Stephen Schey; Jim Francfort

2014-03-01T23:59:59.000Z

70

A cask fleet operations study  

SciTech Connect (OSTI)

This document describes the cask fleet currently available to transport spent nuclear fuels. The report describes the proposed operational procedures for these casks and the vehicles intended to transport them. Included are techniques for loading the cask, lifting it onto the transport vehicle, preparing the invoices, and unloading the cask at the destination. The document concludes with a discussion on the maintenance and repair of the casks. (tem) 29 figs.

Not Available

1988-03-01T23:59:59.000Z

71

Federal Fleet Program Overview (Fact Sheet)  

SciTech Connect (OSTI)

Fact sheet overview of FEMP services and assistance available to Federal fleet managers to implement alternative fuel and advanced vehicle strategies in compliance with Federal goals and requirements.

Not Available

2010-06-01T23:59:59.000Z

72

Controlled Hydrogen Fleet and Infrastructure Analysis (Presentation)  

SciTech Connect (OSTI)

This presentation by Keith Wipke at the 2007 DOE Hydrogen Program Annual Merit Review Meeting provides information about NREL's Controlled Hydrogen Fleet and Infrastructure Analysis Project.

Wipke, K.

2007-05-17T23:59:59.000Z

73

Mitsubishi iMiEV: An Electric Mini-Car in NREL's Advanced Technology Vehicle Fleet (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet highlights the Mitsubishi iMiEV, an electric mini-car in the advanced technology vehicle fleet at the National Renewable Energy Laboratory (NREL). In support of the U.S. Department of Energy's fast-charging research efforts, NREL engineers are conducting charge and discharge performance testing on the vehicle. NREL's advanced technology vehicle fleet features promising technologies to increase efficiency and reduce emissions without sacrificing safety or comfort. The fleet serves as a technology showcase, helping visitors learn about innovative vehicles that are available today or are in development. Vehicles in the fleet are representative of current, advanced, prototype, and emerging technologies.

Not Available

2011-10-01T23:59:59.000Z

74

Advanced Thermal Simulator Testing: Thermal Analysis and Test Results  

SciTech Connect (OSTI)

Work at the NASA Marshall Space Flight Center seeks to develop high fidelity, electrically heated thermal simulators that represent fuel elements in a nuclear reactor design to support non-nuclear testing applicable to the potential development of a space nuclear power or propulsion system. Comparison between the fuel pins and thermal simulators is made at the outer fuel clad surface, which corresponds to the outer sheath surface in the thermal simulator. The thermal simulators that are currently being tested correspond to a liquid metal cooled reactor design that could be applied for Lunar surface power. These simulators are designed to meet the geometric and power requirements of a proposed surface power reactor design, accommodate testing of various axial power profiles, and incorporate imbedded instrumentation. This paper reports the results of thermal simulator analysis and testing in a bare element configuration, which does not incorporate active heat removal, and testing in a water-cooled calorimeter designed to mimic the heat removal that would be experienced in a reactor core.

Bragg-Sitton, Shannon M.; Dickens, Ricky; Dixon, David; Reid, Robert; Adams, Mike; Davis, Joe [NASA Marshall Space Flight Center, Nuclear Systems Branch/ER24, MSFC, AL 35812 (United States)

2008-01-21T23:59:59.000Z

75

Fleet Vehicles | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityFieldMinds" | National Hansen 1 , M.62 16 30Fleet

76

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Fort Vancouver National Historic Site  

SciTech Connect (OSTI)

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for the U.S. Department of Energy’s Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (ITSNA) to collect data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization study. The Advanced Vehicle Testing Activity study seeks to collect data to validate the use of advanced electric drive vehicle transportation. This report focuses on the Fort Vancouver National Historic Site (FVNHS) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of electric vehicles (EVs) into the agencies’ fleet. Individual observations of the selected vehicles provided the basis for recommendations related to EV adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles) could fulfill the mission requirements. FVNHS identified three vehicles in its fleet for consideration. While the FVNHS vehicles conduct many different missions, only two (i.e., support and pool missions) were selected by agency management to be part of this fleet evaluation. The logged vehicles included a pickup truck and a minivan. This report will show that BEVs and PHEVs are capable of performing the required missions and providing an alternative vehicle for both mission categories, because each has sufficient range for individual trips and time available each day for charging to accommodate multiple trips per day. These charging events could occur at the vehicle’s home base, high-use work areas, or in intermediate areas along routes that the vehicles frequently travel. Replacement of vehicles in the current fleet would result in significant reductions in emission of greenhouse gases and petroleum use, while also reducing fuel costs. The Vancouver, Washington area and neighboring Portland, Oregon are leaders in adoption of PEVs in the United States1. PEV charging stations, or more appropriately identified as electric vehicle supply equipment, located on the FVNHS facility would be a benefit for both FVNHS fleets and general public use. Fleet drivers and park visitors operating privately owned plug-in electric vehicles benefit by using the charging infrastructure. ITSNA recommends location analysis of the FVNHS site to identify the optimal station placement for electric vehicle supply equipment. ITSNA recognizes the support of Idaho National Laboratory and ICF International for their efforts to initiate communication with the National Parks Service and FVNHS for participation in this study. ITSNA is pleased to provide this report and is encouraged by the high interest and support from the National Park Service and FVNHS personnel

Stephen Schey; Jim Francfort

2014-03-01T23:59:59.000Z

77

CLSM bleed water reduction test results  

SciTech Connect (OSTI)

Previous testing by BSRI/SRTC/Raytheon indicated that the CLSM specified for the Tank 20 closure generates about 6 gallons (23 liters) of bleed water per cubic yard of material (0.76 m3).1 This amount to about 10 percent of the total mixing water. HLWE requested that the CLSM mix be optimized to reduce bleed water while maintaining flow. Elimination of bleed water from the CLSM mix specified for High-Level Waste Tank Closure will result in waste minimization, time savings and cost savings. Over thirty mixes were formulated and evaluated at the on-site Raytheon Test Laboratory. Improved low bleed water CLSM mixes were identified. Results are documented in this report.

Langton, C.A. [Westinghouse Savannah River Company, Aiken, SC (United States); Rajendran, N. [Bechtel Savannah River Company, Aiken, SC (United States)

1997-04-21T23:59:59.000Z

78

Advanced Vehicle Testing and Evaluation  

SciTech Connect (OSTI)

The objective of the United States (U.S.) Department of Energy?s (DOEs) Advanced Vehicle Testing and Evaluation (AVTE) project was to provide test and evaluation services for advanced technology vehicles, to establish a performance baseline, to determine vehicle reliability, and to evaluate vehicle operating costs in fleet operations. Vehicles tested include light and medium-duty vehicles in conventional, hybrid, and all-electric configurations using conventional and alternative fuels, including hydrogen in internal combustion engines. Vehicles were tested on closed tracks and chassis dynamometers, as well as operated on public roads, in fleet operations, and over prescribed routes. All testing was controlled by procedures developed specifically to support such testing. Testing and evaluations were conducted in the following phases: ? Development of test procedures, which established testing procedures; ? Baseline performance testing, which established a performance baseline; ? Accelerated reliability testing, which determined vehicle reliability; ? Fleet testing, used to evaluate vehicle economics in fleet operation, and ? End of test performance evaluation. Test results are reported by two means and posted by Idaho National Laboratory (INL) to their website: quarterly progress reports, used to document work in progress; and final test reports. This final report documents work conducted for the entirety of the contract by the Clarity Group, Inc., doing business as ECOtality North America (ECOtality). The contract was performed from 1 October 2005 through 31 March 2013. There were 113 light-duty on-road (95), off-road (3) and low speed (15) vehicles tested.

Garetson, Thomas

2013-03-31T23:59:59.000Z

79

Scalable Statistical Monitoring of Fleet , Dimitry Gorinevsky  

E-Print Network [OSTI]

LLC, Palo Alto, CA e-mail: dimitry@mitekan.com Abstract: This paper considers the problem of fitting monitoring of data from a fleet (population) of similar units. A fleet-wide extension of the multivariable historical cruise flight data. 1. INTRODUCTION 1.1 Population monitoring problems This paper considers

80

Hoover Police Fleet Reaches Alternative Fuel Milestone  

Broader source: Energy.gov [DOE]

When Tony Petelos became the mayor of Hoover in 2004, the police fleet was run down. Within the next year, Petelos, with support from the community, called for a big change: switch out the old police fleet with new, flexible-fueled vehicles.

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Vehicle Technologies and Bus Fleet Replacement Optimization  

E-Print Network [OSTI]

1 Vehicle Technologies and Bus Fleet Replacement Optimization: problem properties and sensitivity: R41 #12;2 Abstract This research presents a bus fleet replacement optimization model to analyze hybrid and conventional diesel vehicles, are studied. Key variables affecting optimal bus type

Bertini, Robert L.

82

Business Case for CNG in Municipal Fleets (Presentation)  

SciTech Connect (OSTI)

Presentation about compressed natural gas in municipal fleets, assessing investment profitability, the VICE model, base-case scenarios, and pressing questions for fleet owners.

Johnson, C.

2010-07-27T23:59:59.000Z

83

RECOVERY ACT -- CLEAN ENERGY COALITION MICHIGAN GREEN FLEETS...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

RECOVERY ACT -- CLEAN ENERGY COALITION MICHIGAN GREEN FLEETS RECOVERY ACT -- CLEAN ENERGY COALITION MICHIGAN GREEN FLEETS 2011 DOE Hydrogen and Fuel Cells Program, and Vehicle...

84

Fueling the Navy's Great Green Fleet with Advanced Biofuels ...  

Broader source: Energy.gov (indexed) [DOE]

Navy's Great Green Fleet with Advanced Biofuels Fueling the Navy's Great Green Fleet with Advanced Biofuels December 5, 2011 - 5:44pm Addthis Idaho National Laboratory describes...

85

Plug-In Hybrid Electric Medium Duty Commercial Fleet Demonstration...  

Broader source: Energy.gov (indexed) [DOE]

Plug-In Hybrid Electric Medium Duty Commercial Fleet Demonstration and Evaluation Plug-In Hybrid Electric Medium Duty Commercial Fleet Demonstration and Evaluation 2011 DOE...

86

AVTA: 2010 Volkswagon Golf Diesel Start-Stop Testing Results...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Volkswagon Golf Diesel Start-Stop Testing Results AVTA: 2010 Volkswagon Golf Diesel Start-Stop Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity...

87

PHASE I SINGLE CELL ELECTROLYZER TEST RESULTS  

SciTech Connect (OSTI)

This document reports the results of Phase I Single Cell testing of an SO{sub 2}-Depolarized Water Electrolyzer. Testing was performed primarily during the first quarter of FY 2008 at the Savannah River National Laboratory (SRNL) using an electrolyzer cell designed and built at SRNL. Other facility hardware were also designed and built at SRNL. This test further advances this technology for which work began at SRNL in 2005. This research is valuable in achieving the ultimate goal of an economical hydrogen production process based on the Hybrid Sulfur (HyS) Cycle. The focus of this work was to conduct single cell electrolyzer tests to further develop the technology of SO{sub 2}-depolarized electrolysis as part of the HyS Cycle. The HyS Cycle is a hybrid thermochemical cycle that may be used in conjunction with advanced nuclear reactors or centralized solar receivers to produce hydrogen by water-splitting. Like all other sulfur-based cycles, HyS utilizes the high temperature thermal decomposition of sulfuric acid to produce oxygen and regenerate sulfur dioxide. The unique aspect of HyS is the generation of hydrogen in a water electrolyzer that is operated under conditions where dissolved sulfur dioxide depolarizes the anodic reaction, resulting in substantial voltage reduction. Low cell voltage is essential for both thermodynamic efficiency and hydrogen cost. Sulfur dioxide is oxidized at the anode, producing sulfuric acid that is sent to the high temperature acid decomposition portion of the cycle. The electrolyzer cell uses the membrane electrode assembly (MEA) concept. The anode and cathode are formed by spraying platinum containing catalyst on both sides of a Proton Exchange Membrane (PEM). In most testing the material of the PEM was NafionR. The electrolyzer cell active area can be as large as 54.8 cm{sup 2}. Feed to the anode of the electrolyzer is a sulfuric acid solution containing sulfur dioxide. The partial pressure of sulfur dioxide could be varied in the range of 1 to 6 atm (15 to 90 psia). Temperatures could be controlled in the range from ambient to 80 C. Hydrogen generated at the cathode of the cell was collected for the purpose of flow measurement and composition analysis. The test facility proved to be easy to operate, versatile, and reliable.

Steimke, J; Timothy Steeper, T

2008-08-05T23:59:59.000Z

88

Partial-array test results in IFSMTF  

SciTech Connect (OSTI)

Preliminary performance tests of two large superconducting magnets have been carried out in the International Fusion Superconducting Magnet Test Facility (IFSMTF). Each of the Japanese (JA) and General Dynamics/Convair (GD) coils was operated up to its full design current of 10.2 kA with the other serving as an adjacent background coil at 40% of design current. Cryostatic stability was demonstrated for both coils by noting recovery from a full half-turn (5 m) driven normal. A new pick-up coil compensation scheme was successfully used for the quench detection system. Each coil remained superconducting when the other was dumped. Unique instrumentation was used to measure changes in bore dimensions and displacement of the winding from the coil case. Agreement between structural analysis and measurement of bore dimension changes resulting from magnetic loads is good. The Swiss (CH) coil underwent only a cryogenic test. The forced cooling worked well and an inlet temperature of 3.8 K was demonstrated.

Lue, J.W.; Dresner, L.; Koizumi, K.; Lubell, M.S.; Luton, J.N.; Shen, S.S.; Zahn, G.R.; Zichy, J.A.

1985-01-01T23:59:59.000Z

89

The ethanol heavy-duty truck fleet demonstration project  

SciTech Connect (OSTI)

This project was designed to test and demonstrate the use of a high- percentage ethanol-blended fuel in a fleet of heavy-duty, over-the- road trucks, paying particular attention to emissions, performance, and repair and maintenance costs. This project also represents the first public demonstration of the use of ethanol fuels as a viable alternative to conventional diesel fuel in heavy-duty engines.

NONE

1997-06-01T23:59:59.000Z

90

Chrysler RAM PHEV Fleet Results Report  

Broader source: Energy.gov (indexed) [DOE]

45 Overall DC electrical energy consumption (DC Whmi) 29 Overall DC electrical energy captured from regenerative braking (DC Whmi) 39 Total number of trips 10,847 Total...

91

Chrysler RAM PHEV Fleet Results Report  

Broader source: Energy.gov (indexed) [DOE]

3 Overall DC electrical energy consumption (DC Whmi) 4 Overall DC electrical energy captured from regenerative braking (DC Whmi) 43 Total number of trips 5,888 Total distance...

92

Chrysler RAM PHEV Fleet Results Report  

Broader source: Energy.gov (indexed) [DOE]

148 Overall DC electrical energy consumption (DC Whmi) 87 Overall DC electrical energy captured from regenerative braking (DC Whmi) 46 Total number of trips 6,223 Total...

93

Chrysler RAM PHEV Fleet Results Report  

Broader source: Energy.gov (indexed) [DOE]

52 Overall DC electrical energy consumption (DC Whmi) 29 Overall DC electrical energy captured from regenerative braking (DC Whmi) 39 Total number of trips 22,071 Total...

94

Chrysler RAM PHEV Fleet Results Report  

Broader source: Energy.gov (indexed) [DOE]

0 Overall DC electrical energy consumption (DC Whmi) 61 Overall DC electrical energy captured from regenerative braking (DC Whmi) 43 Total number of trips 111,773 Total...

95

Chrysler RAM PHEV Fleet Results Report  

Broader source: Energy.gov (indexed) [DOE]

20 Overall AC electrical energy consumption (AC Whmi) 93 Overall DC electrical energy consumption (DC Whmi) 71 Overall DC electrical energy captured from regenerative braking...

96

Chrysler RAM PHEV Fleet Results Report  

Broader source: Energy.gov (indexed) [DOE]

4 Overall DC electrical energy consumption (DC Whmi) 72 Overall DC electrical energy captured from regenerative braking (DC Whmi) 44 Total number of trips 36,749 Total distance...

97

Chrysler RAM PHEV Fleet Results Report  

Broader source: Energy.gov (indexed) [DOE]

number of charging events 2,590 Number of charging events at Level 1 | Level 2 588 | 1990 Total charging energy consumed (AC kWh) 17,571 Charging energy consumed at Level 1 |...

98

Los Alamos test-room results  

SciTech Connect (OSTI)

Fourteen Los Alamos test rooms have been operated for several years; this paper covers operation during the winters of 1980-81 and 1981-82. Extensive data have been taken and computer analyzed to determine performance parameters such as efficiency, solar savings fraction, and comfort index. The rooms are directly comparable because each has the same net coefficient and solar collection area and thus the same load collector ratio. Configurations include direct gain, unvented Trombe walls, water walls, phase change walls, and two sunspace geometries. Strategies for reducing heat loss include selective surfaces, two brands of superglazing windows, a heat pipe system, and convection-suppression baffles. Significant differences in both backup heat and comfort are observed among the various rooms. The results are useful, not only for direct room-to-room comparisons, but also to provide data for validation of computer simulation programs.

McFarland, R.D.; Balcomb, J.D.

1982-01-01T23:59:59.000Z

99

Results of the fourth Hanna field test  

SciTech Connect (OSTI)

The second phase (Hanna IVB) of a coal gasification experiment near Hanna, Wyoming, was completed in September 1979. The experiment attempted to link and gasify coal between process wells spaced 34.3 meters apart. Intermediate wells were positioned between the process wells so that the link could be relayed over shorter distances. Reverse combustion linking was attempted over a 22.9-meter and a 11.4-meter distance of the total well spacing. Thermal activity was generally noted in the upper 3 meters of the coal seam during the link. Two attempts to gasify over the 34.3-meter distance resulted in the propagation of the burn front at the coal overburden interface. Post-burn evaluation indicates fractures as major influencing factors of the combustion process. The Hanna IVB field test provided much insight into influence that geologic features have on in situ coal combustion. The influence of these faults, permeable zones, and cleats, on the air flow patterns can drastically change the overall results of a gasification experiment and should be studied further. The overall results of Hanna IVB were discouraging because of the rapid decline in the heating values for the production gas and the amount of coal gasified. With more complete geologic characerization prior to experimentation and proper well completions, it is believed that most of the subsurface operational problems encountered during Hanna IV could have been avoided.

Covell, J. R.; Wojdac, L. F.; Barbour, F. A.; Gardner, G. W.; Glass, R.; Hommert, P. J.

1980-01-01T23:59:59.000Z

100

EPAct Alternative Fuel Transportation Program: State and Alternative Fuel Provider Fleet Compliance Annual Report (Brochure)  

SciTech Connect (OSTI)

This annual report summarizes the compliance results of state and alternative fuel provider fleets covered by the Energy Policy Act of 1992 (EPAct) for model year 2008/fiscal year 2009.

Not Available

2010-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Chrysler RAM PHEV Fleet Test Reports  

Broader source: Energy.gov (indexed) [DOE]

33 Overall DC electrical energy consumption (DC Whmi) 74 Overall DC electrical energy captured from regenerative braking (DC Whmi) 33 Total number of trips 5,273 Total distance...

102

Deployment of EVs in the Federal Fleet  

Broader source: Energy.gov [DOE]

Presentation covers the Deployment of EV's in the Federal Fleet and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

103

Stochastic ship fleet routing with inventory limits   

E-Print Network [OSTI]

This thesis describes a stochastic ship routing problem with inventory management. The problem involves finding a set of least costs routes for a fleet of ships transporting a single commodity when the demand for ...

Yu, Yu

2010-01-01T23:59:59.000Z

104

Summer Infiltration/Ventilation Test Results from the FRTF Laboratory...  

Broader source: Energy.gov (indexed) [DOE]

Summer InfiltrationVentilation Test Results from the FRTF Laboratory Summer InfiltrationVentilation Test Results from the FRTF Laboratory This presentation was delivered at the...

105

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations H2-Assisted NOx Traps: Test Cell Results Vehicle Installations 2003 DEER Conference Presentation: ArvinMeritor...

106

Understanding the Poor Resolution from Test Beam RunUnderstanding the Poor Resolution from Test Beam Run 2004 Straw Test beam results2004 Straw Test beam results  

E-Print Network [OSTI]

1 Understanding the Poor Resolution from Test Beam RunUnderstanding the Poor Resolution from Test Beam Run aah #12;2 2004 Straw Test beam results2004 Straw Test beam results ! Doc # 3308 v#3 by A. Ledovskoy " Using Data from 2004 Test Beam " Used "triplet" method for beam nominally perpendicular to Straw

107

Statistical Analysis of Transient Cycle Test Results in a 40...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Analysis of Transient Cycle Test Results in a 40 CFR Part 1065 Engine Dynamometer Test Cell Statistical Analysis of Transient Cycle Test Results in a 40 CFR Part 1065 Engine...

108

CleanFleet. Final report: Volume 5, employee attitude assessment  

SciTech Connect (OSTI)

The experiences of couriers, operations managers, vehicle handlers (refuelers), and mechanics who drove and/or worked with alternative fuel vehicles, and the attitudes and perceptions of people with these experiences, are examined. Five alternative fuels studied in the CleanFleet project are considers& compressed natural gas, propane gas, California Phase 2 reformulated gasoline, M-85, and electricity. The three major areas of interest include comparative analysis of issues such as health, safety and vehicle performance, business issues encompassing several facets of station operations, and personal commentary and opinions about the CleanFleet project and the alterative fuels. Results of the employee attitude assessment are presented as both statistical and qualitative analysis.

NONE

1995-12-01T23:59:59.000Z

109

EVOLUTION OF THE HOUSEHOLD VEHICLE FLEET: ANTICIPATING FLEET COMPOSITION, PHEV ADOPTION AND GHG  

E-Print Network [OSTI]

EVOLUTION OF THE HOUSEHOLD VEHICLE FLEET: ANTICIPATING FLEET COMPOSITION, PHEV ADOPTION AND GHG evolution, vehicle ownership, plug-in hybrid electric vehicles (PHEVs), climate change policy, stated preference, opinion survey, microsimulation ABSTRACT In todays world of volatile fuel prices and climate

Kockelman, Kara M.

110

2011 HONDA CR-Z 2982 - HYBRID ELECTRIC VEHICLE BATTERY TEST RESULTS  

SciTech Connect (OSTI)

The U.S. Department of Energy’s Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles, including testing traction batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on-road fleet testing. This report documents battery testing performed for the 2011 Honda CR-Z (VIN JHMZF1C64BS002982). Battery testing was performed by Intertek Testing Services NA. The Idaho National Laboratory and Intertek collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Office of the U.S. Department of Energy.

Gray, Tyler [Interek; Shirk, Matthew [Idaho National Laboratory; Wishart, Jeffrey [Interek

2014-09-01T23:59:59.000Z

111

2011 Honda CR-Z 4466 - Hybrid Electric Vehicle Battery Test Results  

SciTech Connect (OSTI)

The U.S. Department of Energy’s Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles, including testing traction batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on-road fleet testing. This report documents battery testing performed for the 2011 Honda CR-Z (VIN JHMZF1C67BS004466). Battery testing was performed by Intertek Testing Services NA. The Idaho National Laboratory and Intertek collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Office of the U.S. Department of Energy.

Tyler Gray; Matthew Shirk; Jeffrey Wishart

2014-09-01T23:59:59.000Z

112

Toyota Prius Plug-In HEV: A Plug-In Hybrid Electric Car in NREL's Advanced Technology Vehicle Fleet (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet highlights the Toyota Prius plug-in HEV, a plug-in hybrid electric car in the advanced technology vehicle fleet at the National Renewable Energy Laboratory (NREL). In partnership with the University of Colorado, NREL uses the vehicle for grid-integration studies and for testing new hardware and charge-management algorithms. NREL's advanced technology vehicle fleet features promising technologies to increase efficiency and reduce emissions without sacrificing safety or comfort. The fleet serves as a technology showcase, helping visitors learn about innovative vehicles that are available today or are in development. Vehicles in the fleet are representative of current, advanced, prototype, and emerging technologies.

Not Available

2011-10-01T23:59:59.000Z

113

anechoic testing results: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

method for susceptibility testing according to the current DO160D standard. Test results on an Engine Data Processor using the implemented procedure and the comparisons...

114

AVTA: Chevrolet Malibu HEV 2013 Testing Results | Department...  

Broader source: Energy.gov (indexed) [DOE]

The following reports describe results of testing done on a 2013 Chevrolet Malibu hybrid electric vehicle. The baseline performance testing provides a point of comparison...

115

Contributing Data to the Fleet DNA Project (Brochure)  

SciTech Connect (OSTI)

The Fleet DNA clearinghouse of commercial fleet transportation data helps vehicle manufacturers and developers optimize vehicle designs and helps fleet managers choose advanced technologies for their fleets. This online tool - available at www.nrel.gov/fleetdna - provides data summaries and visualizations similar to real-world 'genetics' for medium- and heavy-duty commercial fleet vehicles operating within a variety of vocations. To contribute your fleet data, please contact Adam Duran of the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) at adam.duran@nrel.gov or 303-275-4586.

Not Available

2014-09-01T23:59:59.000Z

116

2010 Honda Insight VIN 0141 Hybrid Electric Vehicle Battery Test Results  

SciTech Connect (OSTI)

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing the HEV batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on road fleet testing. This report documents battery testing performed for the 2010 Honda Insight HEV (VIN: JHMZE2H78AS010141). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Program of the U.S. Department of Energy.

Tyler Gray

2013-01-01T23:59:59.000Z

117

2010 Ford Fusion VIN 4757 Hybrid Electric Vehicle Battery Test Results  

SciTech Connect (OSTI)

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing HEV batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on-road fleet testing. This report documents battery testing performed for the 2010 Ford Fusion HEV (VIN: 3FADP0L34AR144757). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Program of the U.S. Department of Energy.

Tyler Gray; Matthew Shirk

2013-01-01T23:59:59.000Z

118

2010 Toyota Prius VIN 6063 Hybrid Electric Vehicle Battery Test Results  

SciTech Connect (OSTI)

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing the HEV batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on road fleet testing. This report documents battery testing performed for the 2010 Toyota Prius HEV (VIN JTDKN3DU5A0006063). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Program of the U.S. Department of Energy.

Tyler Gray; Matthew Shirk

2013-01-01T23:59:59.000Z

119

2010 Honda Insight VIN 1748 Hybrid Electric Vehicle Battery Test Results  

SciTech Connect (OSTI)

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing the HEV batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on road fleet testing. This report documents battery testing performed for the 2010 Honda Insight HEV (VIN: JHMZE2H59AS011748). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Program of the U.S. Department of Energy.

Tyler Gray; Matthew Shirk

2013-01-01T23:59:59.000Z

120

2010 Toyota Prius VIN 0462 Hybrid Electric Vehicle Battery Test Results  

SciTech Connect (OSTI)

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing the HEV batteries when both the vehicles and batteries are new and at the conclusion of 160,000 miles of on road fleet testing. This report documents battery testing performed for the 2010 Toyota Prius HEV (VIN: JTDKN3DU2A5010462). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the Advanced Vehicle Testing Activity for the Vehicle Technologies Program of the U.S. Department of Energy.

Tyler Gray; Matthew Shirk

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

2010 Honda Civic Hybrid UltraBattery Conversion 5577 - Hybrid Electric Vehicle Battery Test Results  

SciTech Connect (OSTI)

The U.S. Department of Energy Advanced Vehicle Testing Activity Program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on hybrid electric vehicles (HEVs), including testing the HEV batteries when both the vehicles and batteries are new and at the conclusion of on-road fleet testing. This report documents battery testing performed for the 2010 Honda Civic HEV UltraBattery Conversion (VIN JHMFA3F24AS005577). Battery testing was performed by the Electric Transportation Engineering Corporation dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the AVTA for the Vehicle Technologies Program of the DOE.

Tyler Gray; Matthew Shirk; Jeffrey Wishart

2013-07-01T23:59:59.000Z

122

2011 Chevrolet Volt VIN 0815 Plug-In Hybrid Electric Vehicle Battery Test Results  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Advanced Vehicle Testing Activity (AVTA) program consists of vehicle, battery, and infrastructure testing on advanced technology related to transportation. The activity includes tests on plug-in hybrid electric vehicles (PHEVs), including testing the PHEV batteries when both the vehicles and batteries are new and at the conclusion of 12,000 miles of on-road fleet testing. This report documents battery testing performed for the 2011 Chevrolet Volt PHEV (VIN 1G1RD6E48BU100815). The battery testing was performed by the Electric Transportation Engineering Corporation (eTec) dba ECOtality North America. The Idaho National Laboratory and ECOtality North America collaborate on the AVTA for the Vehicle Technologies Program of the DOE.

Tyler Gray; Matthew Shirk; Jeffrey Wishart

2013-07-01T23:59:59.000Z

123

Fleet Evaluation and Factory Installation of Aerodynamic Heavy Duty Truck Trailers  

SciTech Connect (OSTI)

The purpose of DE-EE0001552 was to develop and deploy a combination of trailer aerodynamic devices and low rolling resistance tires that reduce fuel consumption of a class 8 heavy duty tractor-trailer combination vehicle by 15%. There were 3 phases of the project: Phase 1 – Perform SAE Typed 2 track tests with multiple device combinations. Phase 2 – Conduct a fleet evaluation with selected device combination. Phase 3 – Develop the devices required to manufacture the aerodynamic trailer. All 3 phases have been completed. There is an abundance of available trailer devices on the market, and fleets and owner operators have awareness of them and are purchasing them. The products developed in conjunction with this project are at least in their second round of refinement. The fleet test undertaken showed an improvement of 5.5 – 7.8% fuel economy with the devices (This does not include tire contribution).

Beck, Jason; Salari, Kambiz; Ortega, Jason; Brown, Andrea

2013-09-30T23:59:59.000Z

124

COMPARING FRACTURE PROPAGATION TESTS AND RELATING TEST RESULTS TO SNOWPACK CHARACTERISTICS  

E-Print Network [OSTI]

COMPARING FRACTURE PROPAGATION TESTS AND RELATING TEST RESULTS TO SNOWPACK CHARACTERISTICS Cameron for a slab and weak layer combination to propagate a fracture. University of Calgary researchers performed propensity. KEYWORDS: fracture propagation, snowpack stability test, extended column test, propagation saw

Jamieson, Bruce

125

AVTA: Chrysler Town and Country 2011 Experimental PHEV Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a Chrysler Town and Country PHEV 2011, an experimental model not currently for sale. The baseline performance testing provides a point of comparison for the other test results. Taken together, these reports give an overall view of how this vehicle functions under extensive testing. This research was conducted by Idaho National Laboratory.

126

Frequently Asked Questions: About Federal Fleet Management (Brochure)  

SciTech Connect (OSTI)

Answers to frequently asked questions about Federal fleet management, Federal requirements, reporting, advanced vehicles, and alternative fuels.

Not Available

2009-10-01T23:59:59.000Z

127

Chronological History of Federal Fleet Actions and Mandates (Brochure)  

SciTech Connect (OSTI)

This chronological history of Federal fleet actions and mandates provides a year-by-year timeline of the acts, amendments, executive orders, and other regulations that affect Federal fleets. The fleet actions and mandates included in the timeline span from 1988 to 2009.

Not Available

2011-04-01T23:59:59.000Z

128

L2B test results Jos de Kloe,  

E-Print Network [OSTI]

ADM-Aeolus L2B test results Jos de Kloe, L2B PM15 11-Mar-2009 #12;L2B-PM15, J. de Kloe, 11-Mar-2009 2 Test cases: Base Reference RMS (1) Academic Tests [with/without noise] (27) Sanity Tests (2) Realistic Tests [LITE data] (9) Mispointing Tests [CALIPSO data] (9) #12;L2B-PM15, J. de Kloe, 11-Mar-2009 3

Stoffelen, Ad

129

L1B test results Jos de Kloe,  

E-Print Network [OSTI]

ADM-Aeolus L1B test results Jos de Kloe, L1B PM16 10-Mar-2009 #12;L2B-PM15, J. de Kloe, 11-Mar-2009 2 Test cases: Base Reference RMS (1) Academic Tests [with/without noise] (27) Sanity Tests (2) Realistic Tests [LITE data] (9) Mispointing Tests [CALIPSO data] (9) #12;L2B-PM15, J. de Kloe, 11-Mar-2009 3

Stoffelen, Ad

130

Fleet DNA Project Data Summary Report (Presentation)  

SciTech Connect (OSTI)

This presentation includes graphical data summaries that highlight statistical trends for medium- and heavy-duty commercial fleet vehicles operating in a variety of vocations. It offers insight for the development of vehicle technologies that reduce costs, fuel consumption, and emission.

Walkowicz, K.; Duran, A.; Burton, E.

2014-04-01T23:59:59.000Z

131

TEST RESULT ANALYSIS WITH RESPECT TO FORMAL SPECIFICATIONS  

E-Print Network [OSTI]

TEST RESULT ANALYSIS WITH RESPECT TO FORMAL SPECIFICATIONS Gregor v. BOCHMANN and Omar B. BELLAL Université de Montréal Montréal, Canada Abstract: There are two aspects to testing: (1) the selection of appropriate test inputs and (2) the analysis of the observed interactions of the implementation under test

von Bochmann, Gregor

132

AVTA ? PHEV Demonstrations and Testing  

Broader source: Energy.gov (indexed) [DOE]

using dedicated drivers and other methods to accumulate miles and cycles - Fleet testing, uses unstructured vehicle utilization - Different testing methods are used to balance...

133

Guidelines for the Establishment of a Model Neighborhood Electric Vehicle (NEV) Fleet  

SciTech Connect (OSTI)

The U.S. Department of Energy’s Advanced Vehicle Testing Activity tests neighborhood electric vehicles (NEVs) in both track and fleet testing environments. NEVs, which are also known as low speed vehicles, are light-duty vehicles with top speeds of between 20 and 25 mph, and total gross vehicle weights of approximately 2,000 pounds or less. NEVs have been found to be very viable alternatives to internal combustion engine vehicles based on their low operating costs. However, special charging infrastructure is usually necessary for successful NEV fleet deployment. Maintenance requirements are also unique to NEVs, especially if flooded lead acid batteries are used as they have watering requirements that require training, personnel protection equipment, and adherence to maintenance schedules. This report provides guidelines for fleet managers to follow in order to successfully introduce and operate NEVs in fleet environments. This report is based on the NEV testing and operational experience of personnel from the Advanced Vehicle Testing Activity, Electric Transportation Applications, and the Idaho National Laboratory.

Roberta Brayer; Donald Karner; Kevin Morrow; James Francfort

2006-06-01T23:59:59.000Z

134

CleanFleet. Volume 2, Project Design and Implementation  

SciTech Connect (OSTI)

The CleanFleet alternative fuels demonstration project evaluated five alternative motorfuels in commercial fleet service over a two-year period. The five fuels were compressed natural gas, propane gas, California Phase 2 reformulated gasoline (RFG), M-85 (85 percent methanol and 15 percent RFG), and electric vans. Eight-four vans were operated on the alternative fuels and 27 vans were operated on gasoline as baseline controls. Throughout the demonstration information was collected on fleet operations, vehicle emissions, and fleet economics. In this volume of the CleanFleet findings, the design and implementation of the project are summarized.

NONE

1995-12-01T23:59:59.000Z

135

In-Plane Conductivity Testing Procedures and Results  

Broader source: Energy.gov (indexed) [DOE]

Plane Conductivity Testing Procedures & Results Samples Tested: N112 NRE212 NRE211 N117 N1035 N1135 Work performed under subcontract with FSECUCF DOE Award No. DE-FC36-06GO16028...

136

Deep Vadose Zone Treatability Test for the Hanford Central Plateau: Soil Desiccation Pilot Test Results  

SciTech Connect (OSTI)

This report describes results of a pilot test of soil desiccation conducted as part of the Deep Vadose Zone Treatability Test program. The report is written in CERCLA treatabilty test report format.

Truex, Michael J.; Oostrom, Martinus; Strickland, Christopher E.; Johnson, Timothy C.; Freedman, Vicky L.; Johnson, Christian D.; Greenwood, William J.; Ward, Anderson L.; Clayton, Ray E.; Lindberg, Michael J.; Peterson, John E.; Hubbard, Susan; Chronister, Glen B.; Benecke, Mark W.

2012-05-01T23:59:59.000Z

137

CleanFleet. Final report: Volume 7, vehicle emissions  

SciTech Connect (OSTI)

Measurements of exhaust and evaporative emissions from Clean Fleet vans running on M-85, compressed natural gas (CNG), California Phase 2 reformulated gasoline (RFG), propane gas, and a control gasoline (RF-A) are presented. Three vans from each combination of vehicle manufacturer and fuel were tested at the California Air Resources Board (ARB) as they accumulated mileage in the demonstration. Data are presented on regulated emissions, ozone precursors, air toxics, and greenhouse gases. The emissions tests provide information on in-use emissions. That is, the vans were taken directly from daily commercial service and tested at the ARB. The differences in alternative fuel technology provide the basis for a range of technology options. The emissions data reflect these differences, with classes of vehicle/fuels producing either more or less emissions for various compounds relative to the control gasoline.

NONE

1995-12-01T23:59:59.000Z

138

NO. REV. MO. _ ALSEP/LCRU EMC Test Results  

E-Print Network [OSTI]

NO. REV. MO. ATM 1050 _ ALSEP/LCRU EMC Test Results PAGE 1 OF 10 DATE 19 August 1971 The results of the ALSEP/LCRU EMC test are reported in this ATM. C~.·--~ s--·~e'Jn~,__')!).Prepared by:__~~~"f--.;;.~-------- Approved by: ~JM.MD. ithian #12;NO. RIV. NO. ATM 1050 ALSEP/LCRU EMC Test Results 2 10PAGE OF Aall

Rathbun, Julie A.

139

Initial Results of IEC 62804 Draft Round Robin Testing (Presentation)  

SciTech Connect (OSTI)

This presentation discusses the Initial round robin results of the IEC 62804 system voltage durability qualification test for crystalline silicon modules.

Hacke, P.; Terwilliger, K.; Koch, S.; Weber, T.; Berghold, J.; Hoffmann, S.; Ambrosi, H.; Koehl, M.; Dietrich, S.; Ebert, M.; Mathiak, G.

2013-05-01T23:59:59.000Z

140

AVTA: 2013 BRP Neighborhood Electric Vehicle Testing Results...  

Energy Savers [EERE]

describe testing results of the 2013 BRP neighborhood electric vehicle. Neighborhood electric vehicles reach speeds of no more than 35 miles per hour and are only allowed on...

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

AVTA: 2009 Vantage Neighborhood Electric Vehicle Testing Results...  

Energy Savers [EERE]

The following reports describe testing results of two 2009 Vantage neighborhood electric vehicles (a pickup truck style and a van style). Neighborhood electric vehicles...

142

Using Accelerated Life Tests Results to Predict Product Field Reliability  

E-Print Network [OSTI]

Using Accelerated Life Tests Results to Predict Product Field Reliability William Q. Meeker Dept State University Ames, IA 50011 June 22, 2008 Abstract Accelerated life tests (ALTs) provide timely, invariably, accelerated life tests (ALTs) to assess the effect of the change is accompanied by a question

143

Dynamic Homecare Service Provisioning: A Field Test and Its Results  

E-Print Network [OSTI]

Dynamic Homecare Service Provisioning: A Field Test and Its Results Alireza Zarghami, Mohammad platform. The prototype was subsequently used in a real-world field test at a care institution in the Netherlands to validate the approach. This paper describes the design of the field test and reflects

Wieringa, Roel

144

AVTA: Volkswagon Golf Diesel Start-Stop 2010 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2010 Volkswagon Golf Diesel vehicle with stop-start technology. Baseline data, which provides a point of comparison for the other test results, was collected at two different research laboratories. Baseline and other data collected at Idaho National Laboratory is in the attached documents. Baseline and battery testing data collected at Argonne National Laboratory is available in summary and CSV form on the Argonne Downloadable Dynometer Database site (http://www.transportation.anl.gov/D3/2010_vw_golf_tdi_bluemotion.html). Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

145

AVTA: Toyota Prius Gen III HEV 2010 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2010 Toyota Prius III hybrid-electric vehicle. Baseline data, which provides a point of comparison for the other test results, was collected at two different research laboratories. Baseline and other data collected at Idaho National Laboratory is in the attached documents. Baseline and battery testing data collected at Argonne National Laboratory is available in summary and CSV form on the Argonne Downloadable Dynometer Database site (http://www.transportation.anl.gov/D3/2010_toyota_prius.html). Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

146

FleetAtlas | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (TheEtelligence (SmartHome Kyoung's picture SubmittedFleetAtlas

147

Cold vacuum drying proof of performance (first article testing) test results  

SciTech Connect (OSTI)

This report presents and details the test results of the first of a kind process referred to as Cold Vacuum Drying (CVD). The test results are compiled from several months of testing of the first process equipment skid and ancillary components to de-water and dry Multi-Canister Overpacks (MCO) filled with Spent Nuclear Fuel (SNF). The tests results provide design verifications, equipment validations, model validation data, and establish process parameters.

MCCRACKEN, K.J.

1999-06-23T23:59:59.000Z

148

A Multivariate Randomization Test of Association Applied to Cognitive Test Results  

E-Print Network [OSTI]

A Multivariate Randomization Test of Association Applied to Cognitive Test Results Albert Ahumada and Bettina Beard NASA Ames Research Center Abstract Randomization tests provide a conceptually simple, distribution-free way to implement significance testing. We have applied this method to the problem

149

AVTA: Mazda 3 Hatchback Start-Stop 2010 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2010 Mazda3 hatchback with stop-start technology. Baseline and other data collected at Idaho National Laboratory is in the attached documents. Baseline and battery testing data collected at Argonne National Laboratory is available in summary and CSV form on the Argonne Downloadable Dynometer Database site (http://www.transportation.anl.gov/D3/2010_mazda_3istop.html). Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

150

AVTA: Smart Fortwo Start-Stop 2010 Testing Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. Baseline data, which provides a point of comparison for the other test results, was collected at two different research laboratories. Baseline and other data collected at Idaho National Laboratory is in the attached documents. Baseline and battery testing data collected at Argonne National Laboratory is available in summary and CSV form on the Argonne Downloadable Dynometer Database site (http://www.transportation.anl.gov/D3/2010_smartcar_mhd.html). Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

151

Size and transportation capabilities of the existing US cask fleet  

SciTech Connect (OSTI)

This study investigates the current spent nuclear fuel cask fleet capability in the United States. In addition, it assesses the degree to which the current fleet would be available, as a contingency, until proposed Office of Civilian Radioactive Waste Management casks become operational. A limited fleet of ten spent fuel transportation casks is found to be readily available for use in Federal waste management efforts over the next decade.

Danese, F.L. (Science Applications International Corp., Oak Ridge, TN (USA)); Johnson, P.E.; Joy, D.S. (Oak Ridge National Lab., TN (USA))

1990-01-01T23:59:59.000Z

152

Fleet Testing Advanced Vehicle Testing Activities - 2010 Honda...  

Broader source: Energy.gov (indexed) [DOE]

Changed oil and filter 28.25 8192009 10,414 Changed oil and filter and checked all fluids, belts, battery, etc. 42.77 9182009 17,488 Changed oil and filter and replaced air...

153

HEV Fleet Testing Advanced Vehicle Testing Activities - 2010...  

Broader source: Energy.gov (indexed) [DOE]

DU5A0006063 Date Mileage Description Cost 8192009 5,090 Changed oil and filter and rotated tires 39.28 9162009 14,484 Changed oil and filter and replaced flat tire 152.58 10...

154

Strategies for Decreasing Petroleum Consumption in the Federal Fleet (Presentation)  

SciTech Connect (OSTI)

Presentation offers strategies federal agency fleets can use to reduce petroleum consumption and build or gain access to alternative fuel infrastructure.

Putsche, V.

2006-06-01T23:59:59.000Z

155

Controlled Hydrogen Fleet and Infrastructure Analysis (2008 Presentation)  

SciTech Connect (OSTI)

This presentation by Keith Wipke at the 2008 DOE Hydrogen Program Annual Merit Review Meeting provides information about NREL's Controlled Hydrogen Fleet and Infrastructure Analysis Project.

Wipke, K.; Sprik, S.; Kurtz, J.

2008-06-10T23:59:59.000Z

156

State and Alternative Fuel Provider Fleet Compliance Methods (Revised) (Brochure)  

SciTech Connect (OSTI)

Fact sheet describes the difference between Standard and Alternative Compliance requirements for state and alternative fuel provider fleets covered under the Energy Policy Acts of 1992 and 2005.

Not Available

2009-12-01T23:59:59.000Z

157

Plug-In Hybrid Electric Medium Duty Commercial Fleet Demonstration...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

rravt068vssmiyasato2011o .pdf More Documents & Publications SCAQMD:Plug-In Hybrid Electric Medium-Duty Commercial Fleet Demonstration and Evaluation Plug-In Hybrid Electric...

158

Merit Review: EPAct State and Alternative Fuel Provider Fleets...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

More Documents & Publications 2012 Merit Review: EPAct State and Alternative Fuel Provider Fleets Vehicle Technologies Office Merit Review 2014: EPAct State and...

159

New National Clean Fleets Partners Build New Roads to Sustainability...  

Energy Savers [EERE]

in the country. Read how UPS, another National Clean Fleets Partner, is reducing petroleum use and emissions of its vehicles. From picking up our recyclables to fixing our...

160

Large Fleets Lead in Petroleum Reduction (Fact Sheet)  

SciTech Connect (OSTI)

Fact sheet describes Clean Cities' National Petroleum Reduction Partnership, an initiative through which large private fleets can receive support from Clean Cities to reduce petroleum consumption.

Proc, H.

2011-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

State and Alternative Fuel Provider Fleet Compliance Methods (Revised) (Brochure)  

SciTech Connect (OSTI)

This fact sheet describes the difference between Standard and Alternative Compliance requirements for state and alternative fuel provider fleets covered by the Energy Policy Act.

Not Available

2014-03-01T23:59:59.000Z

162

Electric vehicle fleet operations in the United States  

SciTech Connect (OSTI)

The US Department of Energy (DOE) is actively supporting the development and commercialization of advanced electric vehicles, batteries, and propulsion systems. As part of this effort, the DOE Field Operations Program is performing commercial validation testing of electric vehicles and supporting the development of an electric vehicle infrastructure. These efforts include the evaluation of electric vehicles in baseline performance, accelerated reliability, and fleet operations testing. The baseline performance testing focuses on parameters such as range, acceleration, and battery charging. This testing, performed in conjunction with EV America, has included the baseline performance testing of 16 electric vehicle models from 1994 through 1997. During 1997, the Chevrolet S10 and Ford Ranger electric vehicles were tested. During 1998, several additional electric vehicles from original equipment manufacturers will also be baseline performance tested. This and additional information is made available to the public via the Program`s web page (http://ev.inel.gov/sop). In conjunction with industry and other groups, the Program also supports the Infrastructure Working Council in its development of electric vehicle communications, charging, health and safety, and power quality standards. The Field Operations Program continues to support the development of electric vehicles and infrastructure in conjunction with its qualified vehicle test partners: Electric Transportation Applications, and Southern California Edison. The Field Operations Program is managed by the Lockheed Martin Idaho Technologies Company at the Idaho National Engineering and Environmental Laboratory.

Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; O`Hara, D. [Dept. of Energy, Washington, DC (United States)

1998-03-01T23:59:59.000Z

163

aging test results: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

test results First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 Testing intermediate-age stellar evolution...

164

China Energy Efficiency Round Robin Testing Results for Room  

E-Print Network [OSTI]

LBNL-3502E China Energy Efficiency Round Robin Testing Results for Room Air Conditioners Nan Zhou Berkeley National Laboratory is an equal opportunity employer. #12;i Table of Contents I. Air Conditioner.......................................................................................................................... 6 I.2.1 Necessity for Air Conditioner Round Robin Testing

165

Results of no-flow rotary drill bit comparison testing  

SciTech Connect (OSTI)

This document describes the results of testing of a newer rotary sampling bit and sampler insert called the No-Flow System. This No-Flow System was tested side by side against the currently used rotary bit and sampler insert, called the Standard System. The two systems were tested using several ''hard to sample'' granular non-hazardous simulants to determine which could provide greater sample recovery. The No-Flow System measurably outperformed the Standard System in each of the tested simulants.

WITWER, K.S.

1998-11-30T23:59:59.000Z

166

Hyundai Sonata HEV Accelerated Testing - March 2013  

Broader source: Energy.gov (indexed) [DOE]

Hyundai Sonata HEV Accelerated Testing - March 2013 Two model year 2011 Hyundai Sonata hybrid electric vehicles (HEVs) entered Accelerated testing during June 2011 in a fleet in...

167

Chevrolet Malibu HEV Accelerated Testing - June 2013  

Broader source: Energy.gov (indexed) [DOE]

Malibu HEV Accelerated Testing - June 2013 Four model year 2013 Chevrolet Malibu hybrid electric vehicles (HEVs) entered Accelerated testing during November 2012 in a fleet in...

168

Clean Fleets Announcement | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top FiveDepartment ofCarrie NoonanClassification TrainingofClean EnergyandFleets

169

Preliminary results of the partial array LCT coil tests  

SciTech Connect (OSTI)

The Large Coil Task (LCT) is a collaboration between the US, Euratom, Japan, and Switzerland for the production and testing of 2.5 x 3.5-m bore, superconducting 8-T magnets. The definitive tests in the design configuration, the six coils arrayed in a compact torus, will begin in 1985. Partial-array tests are being done in 1984. In January the initial cooldown of two coils was aborted because of helium-to-vacuum leaks that developed in certain seal welds when the coil temperatures were 170 to 180 K. In July three adjacent coils (designated JA, GD, CH) were cooled and in August two were energized to the limits of the test facility. An overview of the results are presented, including facility, cooldown (warmup has not yet begun), energization, dump, recovery from intentional normal zones, strain, and displacement, for operation up to 100% of design current but below full field and stress. These initial results are highly encouraging.

Luton, J.N.; Cogswell, F.D.; Dresner, L.; Friesinger, G.M.; Gray, W.H.; Iwasa, Y.; Koizumi, K.; Lubell, M.S.; Lue, J.W.; Nishi, M.F.

1984-09-10T23:59:59.000Z

170

Results from simulated upper-plenum aerosol transport tests  

SciTech Connect (OSTI)

A series of eight aerosol transport experiments, designated as Aerosol Transport Tests (ATT) A101 through A108, has recently been completed at the Oak Ridge National Laboratory (ORNL). These tests provide a data base for validation of aerosol transport modeling used in the TRAP-MELT2 computer code (Jordan and Kuhlman, 1985), which was developed at Battelle Columbus Laboratories to calculate aerosol/fission-product transport in the reactor coolant system in postulated light-water reactor (LWR) core-melt accidents. Results from tests A103 and A104 have been summarized in a previous paper (Wright and Pattison, 1985a); the present paper discusses results from tests A105 through A108.

Wright, A.L.; Pattison, W.L.

1986-01-01T23:59:59.000Z

171

Plug-In Electric Vehicle Handbook for Fleet Managers (Brochure)  

SciTech Connect (OSTI)

Plug-in electric vehicles (PEVs) are entering the automobile market and are viable alternatives to conventional vehicles. This guide for fleet managers describes the basics of PEV technology, PEV benefits for fleets, how to select the right PEV, charging a PEV, and PEV maintenance.

Not Available

2012-04-01T23:59:59.000Z

172

Biofuels, Climate Policy, and the European Vehicle Fleet  

E-Print Network [OSTI]

Biofuels, Climate Policy, and the European Vehicle Fleet Xavier Gitiaux, Sebastian Rausch, Sergey on the Science and Policy of Global Change. Abstract We examine the effect of biofuels mandates and climate incorporates current generation biofuels, accounts for stock turnover of the vehicle fleets, disaggregates

173

Plug-In Electric Vehicle Handbook for Fleet Managers  

E-Print Network [OSTI]

Plug-In Electric Vehicle Handbook for Fleet Managers #12;Plug-In Electric Vehicle Handbook Infrastructure Successfully deploying plug-in electric vehicles (PEVs) and charging infrastructure requires at www.cleancities.energy.gov. #12;Plug-In Electric Vehicle Handbook for Fleets 3 You've heard the buzz

174

1-pin blanket mockup: Results of the extended test campaign  

SciTech Connect (OSTI)

Following a preliminary test campaign (200 thermal cycles) on a solid breeder blanket mockup, an extended test campaign (about 1000 thermal cycles) has been carried out by ENEA. The duration of the test campaign represents a significant fraction of the blanket module lifetime in the ITER device. In particular, these out-of-pile experiments have been performed in order to test (both functional and endurance testing) the thermal-hydraulic and thermo-mechanical performance of a water cooled breeder-in-tube blanket mockup (1-PIN) using Li{sub 2}ZrO{sub 3} pebbles as a breeder material. The test campaign has been completed and the resulting data concerning thermal and thermal-hydraulic parameters have been elaborated and analyzed by means of a comparison with theoretical predictions based on a proper thermal-hydraulic model. The post test examination of the pebbles is in progress in order to investigate the thermo-mechanical behavior of the breeder material under cycling. The paper deals with the first part of the results. 6 refs., 11 figs., 1 tab.

Ferrari, M.; Talarico, C. [EURATOM-ENEA, Frascati (Italy); Furrer, M.; Simbolotti, G. [ENEA, S. Maria in Galeria (Italy)

1996-12-31T23:59:59.000Z

175

P1.2 -- Hybrid Electric Vehicle and Lithium Polymer NEV Testing  

SciTech Connect (OSTI)

The U.S. Department of Energy’s Advanced Vehicle Testing Activity tests hybrid electric, pure electric, and other advanced technology vehicles. As part of this testing, 28 hybrid electric vehicles (HEV) are being tested in fleet, dynamometer, and closed track environments. This paper discusses some of the HEV test results, with an emphasis on the battery performance of the HEVs. It also discusses the testing results for a small electric vehicle with a lithium polymer traction battery.

J. Francfort

2006-06-01T23:59:59.000Z

176

Performance test results for the Eaton dc developmental power train in an electric test bed vehicle  

SciTech Connect (OSTI)

This report presents the results of the tests performed on a direct current (dc) power train in a test bed vehicle developed by the Eaton Corporation for the US Department of Energy (DOE). The tests were performed by EG and G Idaho, Inc. at the Idaho National Engineering Laboratory (INEL). The purpose of the INEL testing was to provide test results from which an evaluation of the performance capabilities of the Eaton dc power train could be made and compared with other vehicle propulsion systems. The planned tests were primarily oriented toward road testing, chassis dynamometer testing, and associated dynamometer coastdown tests for road loss determination. Range tests of the Eaton dc test bed vehicle using an ALCO 2200 lead acid battery pack, produced ranges of 97 km at 56 km/h (60 miles at 35 mph), 79 km at 72 km/h (49 miles at 45 mph), and 47 km at 88 km/h (29 miles at 55 mph). The corresponding net dc energy consumptions are 135 Wh/km (217 Wh/mile), 145 Wh/km (233 Wh/mile), and 178 Wh/km (287 Wh/mile). The energy consumption for the D-cycle test was 241 Wh/km (387 Wh/mile). 8 refs., 11 figs., 16 tabs.

Crumley, R.L.; Donaldson, M.R.

1987-09-01T23:59:59.000Z

177

Small-Scale Spray Releases: Initial Aerosol Test Results  

SciTech Connect (OSTI)

One of the events postulated in the hazard analysis at the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids with Newtonian fluid behavior. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and across processing facilities in the DOE complex. Two key technical areas were identified where testing results were needed to improve the technical basis by reducing the uncertainty due to extrapolating existing literature results. The first technical need was to quantify the role of slurry particles in small breaches where the slurry particles may plug and result in substantially reduced, or even negligible, respirable fraction formed by high-pressure sprays. The second technical need was to determine the aerosol droplet size distribution and volume from prototypic breaches and fluids, specifically including sprays from larger breaches with slurries where data from the literature are scarce. To address these technical areas, small- and large-scale test stands were constructed and operated with simulants to determine aerosol release fractions and net generation rates from a range of breach sizes and geometries. The properties of the simulants represented the range of properties expected in the WTP process streams and included water, sodium salt solutions, slurries containing boehmite or gibbsite, and a hazardous chemical simulant. The effect of antifoam agents was assessed with most of the simulants. Orifices included round holes and rectangular slots. For the combination of both test stands, the round holes ranged in size from 0.2 to 4.46 mm. The slots ranged from (width × length) 0.3 × 5 to 2.74 × 76.2 mm. Most slots were oriented longitudinally along the pipe, but some were oriented circumferentially. In addition, a limited number of multi-hole test pieces were tested in an attempt to assess the impact of a more complex breach. Much of the testing was conducted at pressures of 200 and 380 psi, but some tests were conducted at 100 psi. Testing the largest postulated breaches was deemed impractical because of the much larger flow rates and equipment that would be required. This report presents the experimental results and analyses for the aerosol measurements obtained in the small-scale test stand. It includes a description of the simulants used and their properties, equipment and operations, data analysis methodologies, and test results. The results of tests investigating the role of slurry particles in plugging small breaches are reported in Mahoney et al. (2012). The results of the aerosol measurements in the large-scale test stand are reported in Schonewill et al. (2012) along with an analysis of the combined results from both test scales.

Mahoney, Lenna A.; Gauglitz, Phillip A.; Kimura, Marcia L.; Brown, Garrett N.; Kurath, Dean E.; Buchmiller, William C.; Smith, Dennese M.; Blanchard, Jeremy; Song, Chen; Daniel, Richard C.; Wells, Beric E.; Tran, Diana N.; Burns, Carolyn A.

2013-05-29T23:59:59.000Z

178

Multiplexer/amplifier test results for SP-100  

SciTech Connect (OSTI)

Multiplexer and amplifier systems must be designed with transistors that can perform satisfactorily over ten years to a total gamma dose of 120E6 rads and a total neutron fluence of 1.6E15 nvt for the SP-100 reactor system. Series of gamma and neutron tests have been completed to measure transistor degradation as a function of total dose, fluence, and temperature. Test results indicate that modest increases in temperature result in substantial improvement of transistor performance at a neutron flux of 8E8 n/cm{sup 2}/s. 2 refs., 3 figs.

King, D.B.; Luker, S.M. (Sandia National Labs., Albuquerque, NM (USA)); Ryan, R. (General Electric Co., San Jose, CA (USA))

1990-01-01T23:59:59.000Z

179

Large coil task and results of testing US coils  

SciTech Connect (OSTI)

The United States, EURATOM, Japan, and Switzerland have collaborated since 1978 in development of superconducting toroidal field coils for fusion reactor applications. The United States provided a test facility nd three coils; the other participants, one coil each. All coils have the same interface dimensions and performance requirements (stable at 8 T), but internal design was decided by each team. Two US coil teams chose bath-cooled NbTi, 10-kA conductors. One developed a Nb/sub 3/Sn conductor, cooled by internal flow, rated at 18 kA. All US coils have diagnostic instrumentation and imbedded heaters that enable stability tests and simulated nuclear heating experiments. In single-coil tests, each coil operated at full current in self-field (6.4 T). In six-coil tests that began in July 1986, one US coil and the Japanese coil hve been successfully operated at full current at 8 T. The other coils have operated as background coils while awaiting their turn as test coil. Coil tests have been informative and results gratifying. The facility has capably supported coil testing and its operation has provided information that will be useful in designing future fusion systems. Coil capabilities beyond nominal design points will be determined.

Haubenreich, P.N.

1986-01-01T23:59:59.000Z

180

Planar Pixel Sensors for the ATLAS Upgrade: Beam Tests results  

E-Print Network [OSTI]

Results of beam tests with planar silicon pixel sensors aimed towards the ATLAS Insertable B-Layer and High Luminosity LHC (HL-LHC) upgrades are presented. Measurements include spatial resolution, charge collection performance and charge sharing between neighbouring cells as a function of track incidence angle for different bulk materials. Measurements of n-in-n pixel sensors are presented as a function of fluence for different irradiations. Furthermore p-type silicon sensors from several vendors with slightly differing layouts were tested. All tested sensors were connected by bump-bonding to the ATLAS Pixel read-out chip. We show that both n-type and p-type tested planar sensors are able to collect significant charge even after integrated fluences expected at HL-LHC.

J. Weingarten; S. Altenheiner; M. Beimforde; M. Benoit; M. Bomben; G. Calderini; C. Gallrapp; M. George; S. Gibson; S. Grinstein; Z. Janoska; J. Jentzsch; O. Jinnouchi; T. Kishida; A. La Rosa; V. Libov; A. Macchiolo; G. Marchiori; D. Münstermann; R. Nagai; G. Piacquadio; B. Ristic; I. Rubinskiy; A. Rummler; Y. Takubo; G. Troska; S. Tsiskaridtze; I. Tsurin; Y. Unno; P. Weigell; T. Wittig

2012-11-09T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Small-Scale Spray Releases: Initial Aerosol Test Results  

SciTech Connect (OSTI)

One of the events postulated in the hazard analysis at the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids with Newtonian fluid behavior. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and across processing facilities in the DOE complex. Two key technical areas were identified where testing results were needed to improve the technical basis by reducing the uncertainty due to extrapolating existing literature results. The first technical need was to quantify the role of slurry particles in small breaches where the slurry particles may plug and result in substantially reduced, or even negligible, respirable fraction formed by high-pressure sprays. The second technical need was to determine the aerosol droplet size distribution and volume from prototypic breaches and fluids, specifically including sprays from larger breaches with slurries where data from the literature are scarce. To address these technical areas, small- and large-scale test stands were constructed and operated with simulants to determine aerosol release fractions and generation rates from a range of breach sizes and geometries. The properties of the simulants represented the range of properties expected in the WTP process streams and included water, sodium salt solutions, slurries containing boehmite or gibbsite, and a hazardous chemical simulant. The effect of anti-foam agents was assessed with most of the simulants. Orifices included round holes and rectangular slots. The round holes ranged in size from 0.2 to 4.46 mm. The slots ranged from (width × length) 0.3 × 5 to 2.74 × 76.2 mm. Most slots were oriented longitudinally along the pipe, but some were oriented circumferentially. In addition, a limited number of multi-hole test pieces were tested in an attempt to assess the impact of a more complex breach. Much of the testing was conducted at pressures of 200 and 380 psi, but some tests were conducted at 100 psi. Testing the largest postulated breaches was deemed impractical because of the large size of some of the WTP equipment. This report presents the experimental results and analyses for the aerosol measurements obtained in the small-scale test stand. It includes a description of the simulants used and their properties, equipment and operations, data analysis methodologies, and test results. The results of tests investigating the role of slurry particles in plugging small breaches are reported in Mahoney et al. (2012). The results of the aerosol measurements in the large-scale test stand are reported in Schonewill et al. (2012) along with an analysis of the combined results from both test scales.

Mahoney, Lenna A.; Gauglitz, Phillip A.; Kimura, Marcia L.; Brown, Garrett N.; Kurath, Dean E.; Buchmiller, William C.; Smith, Dennese M.; Blanchard, Jeremy; Song, Chen; Daniel, Richard C.; Wells, Beric E.; Tran, Diana N.; Burns, Carolyn A.

2012-11-01T23:59:59.000Z

182

GICHD Mine Dog Testing Project - Soil Sample Results No.3  

SciTech Connect (OSTI)

A mine dog evaluation project initiated by the Geneva International Center for Humanitarian Demining is evaluating the capability and reliability of mine detection dogs. The performance of field-operational mine detection dogs will be measured in test minefields in Afghanistan and Bosnia containing actual, but unfused landmines. Repeated performance testing over two years through various seasonal weather conditions will provide data simulating near real world conditions. Soil samples will be obtained adjacent to the buried targets repeatedly over the course of the test. Chemical analysis results from these soil samples will be used to evaluate correlations between mine dog detection performance and seasonal weather conditions. This report documents the analytical chemical methods and results from the third batch of soils received. This batch contained samples from Kharga, Afghanistan collected in October 2002.

PHELAN, JAMES M.; BARNETT, JAMES L.; BENDER, SUSAN FAE ANN; ARCHULETA, LUISA M.

2003-03-01T23:59:59.000Z

183

GICHD mine dog testing project - soil sample results #4.  

SciTech Connect (OSTI)

A mine dog evaluation project initiated by the Geneva International Center for Humanitarian Demining is evaluating the capability and reliability of mine detection dogs. The performance of field-operational mine detection dogs will be measured in test minefields in Afghanistan and Bosnia containing actual, but unfused landmines. Repeated performance testing over two years through various seasonal weather conditions will provide data simulating near real world conditions. Soil samples will be obtained adjacent to the buried targets repeatedly over the course of the test. Chemical analysis results from these soil samples will be used to evaluate correlations between mine dog detection performance and seasonal weather conditions. This report documents the analytical chemical methods and results from the fourth batch of soils received. This batch contained samples from Kharga, Afghanistan collected in April 2003 and Sarajevo, Bosnia collected in May 2003.

Barnett, James L.; Phelan, James M.; Archuleta, Luisa M.; Wood, Tyson B.; Donovan, Kelly L.; Bender, Susan Fae Ann

2003-08-01T23:59:59.000Z

184

SSPS results of test and operation, 1981-1984  

SciTech Connect (OSTI)

The results of three years of testing and operation of the two dissimilar solar thermal power plants of the SSPS project are summarized. The project includes: (1) a Distributed Collector System, and (2) a Central Receiver System. Environmental conditions are presented and an economical assessment of the project is provided. (BCS)

none,

1985-05-01T23:59:59.000Z

185

Results of irradiated cladding tests and clad plate experiments  

SciTech Connect (OSTI)

Two aspects critical to the fracture behavior of three-wire stainless steel cladding were investigated by the Heavy-Section Steel Technology (HSST) Program: (1) radiation effects on cladding strength and toughness, and (2) the response of mechanically loaded, flawed structures in the presence of cladding (clad plate experiments). Postirradiation testing results show that, in the test temperature range from /minus/125 to 288/degree/C, the yield strength increased, and ductility insignificantly increased, while there was almost no change in ultimate tensile strength. All cladding exhibited ductile-to-brittle transition behavior during Charpy impact testing. Radiation damage decreased the Charpy upper-shelf energy by 15 to 20% and resulted in up to 28/degree/C shifts of the Charpy impact transition temperature. Results of irradiated 12.5-mm-thick compact specimens (0.5TCS) show consistent decreases in the ductile fracture toughness, J/sub Ic/, and the tearing modulus. Results from clad plate tests have shown that (1) a tough surface layer composed of cladding and/or heat-affected zone has arrested running flaws under conditions where unclad plates have ruptured, and (2) the residual load-bearing capacity of clad plates with large subclad flaws significantly exceeded that of an unclad plate. 13 figs., 1 tab.

Haggag, F.M.; Iskander, S.K.

1988-01-01T23:59:59.000Z

186

Recent results on the RIA test in IGR reactor  

SciTech Connect (OSTI)

At the 23d WRSM meeting the data base characterizing results of VVER high burnup fuel rods tests under reactivity-initiated accident (RIA) conditions was presented. Comparison of PWR and VVER failure thresholds was given also. Additional analysis of the obtained results was being carried out during 1996. The results of analysis show that the two different failure mechanisms were observed for PWR and VVER fuel rods. Some factors which can be as the possible reasons of these differences are presented. First of them is the state of preirradiated cladding. Published test data for PWR high burnup fuel rods demonstrated that the PWR high burnup fuel rods failed at the RIA test are characterized by very high level of oxidation and hydriding for the claddings. Corresponding researches were performed at Institute of Atomic Reactors (RLAR, Dimitrovgrad, Russia) for large set of VVER high burnup fuel rods. Results of these investigations show that preirradiated commercial Zr-1%Nb claddings practically keep their initial levels of oxidation and H{sub 2} concentration. Consequently the VVER preirradiated cladding must keep the high level of mechanical properties. The second reason leading to differences between failure mechanisms for two types of high burnup fuel rods can be the test conditions. Now such kind of analysis have been performed by two methods.

Asmolov, V.; Yegorova, L. [Nuclear Safety Institute, Moscow (Russian Federation)

1997-01-01T23:59:59.000Z

187

Large-Scale Spray Releases: Initial Aerosol Test Results  

SciTech Connect (OSTI)

One of the events postulated in the hazard analysis at the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids with Newtonian fluid behavior. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and across processing facilities in the DOE complex. Two key technical areas were identified where testing results were needed to improve the technical basis by reducing the uncertainty due to extrapolating existing literature results. The first technical need was to quantify the role of slurry particles in small breaches where the slurry particles may plug and result in substantially reduced, or even negligible, respirable fraction formed by high-pressure sprays. The second technical need was to determine the aerosol droplet size distribution and volume from prototypic breaches and fluids, specifically including sprays from larger breaches with slurries where data from the literature are scarce. To address these technical areas, small- and large-scale test stands were constructed and operated with simulants to determine aerosol release fractions and generation rates from a range of breach sizes and geometries. The properties of the simulants represented the range of properties expected in the WTP process streams and included water, sodium salt solutions, slurries containing boehmite or gibbsite, and a hazardous chemical simulant. The effect of anti-foam agents was assessed with most of the simulants. Orifices included round holes and rectangular slots. The round holes ranged in size from 0.2 to 4.46 mm. The slots ranged from (width × length) 0.3 × 5 to 2.74 × 76.2 mm. Most slots were oriented longitudinally along the pipe, but some were oriented circumferentially. In addition, a limited number of multi-hole test pieces were tested in an attempt to assess the impact of a more complex breach. Much of the testing was conducted at pressures of 200 and 380 psi, but some tests were conducted at 100 psi. Testing the largest postulated breaches was deemed impractical because of the large size of some of the WTP equipment. The purpose of this report is to present the experimental results and analyses for the aerosol measurements obtained in the large-scale test stand. The report includes a description of the simulants used and their properties, equipment and operations, data analysis methodology, and test results. The results of tests investigating the role of slurry particles in plugging of small breaches are reported in Mahoney et al. 2012a. The results of the aerosol measurements in the small-scale test stand are reported in Mahoney et al. (2012b).

Schonewill, Philip P.; Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.; Kurath, Dean E.; Adkins, Harold E.; Billing, Justin M.; Burns, Carolyn A.; Davis, James M.; Enderlin, Carl W.; Fischer, Christopher M.; Jenks, Jeromy WJ; Lukins, Craig D.; MacFarlan, Paul J.; Shutthanandan, Janani I.; Smith, Dennese M.

2012-12-01T23:59:59.000Z

188

Graphite electrode arc melter demonstration Phase 2 test results  

SciTech Connect (OSTI)

Several U.S. Department of Energy organizations and the U.S. Bureau of Mines have been collaboratively conducting mixed waste treatment process demonstration testing on the near full-scale graphite electrode submerged arc melter system at the Bureau`s Albany (Oregon) Research Center. An initial test series successfully demonstrated arc melter capability for treating surrogate incinerator ash of buried mixed wastes with soil. The conceptual treatment process for that test series assumed that buried waste would be retrieved and incinerated, and that the incinerator ash would be vitrified in an arc melter. This report presents results from a recently completed second series of tests, undertaken to determine the ability of the arc melter system to stably process a wide range of {open_quotes}as-received{close_quotes} heterogeneous solid mixed wastes containing high levels of organics, representative of the wastes buried and stored at the Idaho National Engineering Laboratory (INEL). The Phase 2 demonstration test results indicate that an arc melter system is capable of directly processing these wastes and could enable elimination of an up-front incineration step in the conceptual treatment process.

Soelberg, N.R.; Chambers, A.G.; Anderson, G.L.; O`Connor, W.K.; Oden, L.L.; Turner, P.C.

1996-06-01T23:59:59.000Z

189

Long Term Corrosion/Degradation Test Six Year Results  

SciTech Connect (OSTI)

The Subsurface Disposal Area (SDA) of the Radioactive Waste Management Complex (RWMC) located at the Idaho National Engineering and Environmental Laboratory (INEEL) contains neutron-activated metals from non-fuel, nuclear reactor core components. The Long-Term Corrosion/Degradation (LTCD) Test is designed to obtain site-specific corrosion rates to support efforts to more accurately estimate the transfer of activated elements to the environment. The test is using two proven, industry-standard methods—direct corrosion testing using metal coupons, and monitored corrosion testing using electrical/resistance probes—to determine corrosion rates for various metal alloys generally representing the metals of interest buried at the SDA, including Type 304L stainless steel, Type 316L stainless steel, Inconel 718, Beryllium S200F, Aluminum 6061, Zircaloy-4, low-carbon steel, and Ferralium 255. In the direct testing, metal coupons are retrieved for corrosion evaluation after having been buried in SDA backfill soil and exposed to natural SDA environmental conditions for times ranging from one year to as many as 32 years, depending on research needs and funding availability. In the monitored testing, electrical/resistance probes buried in SDA backfill soil will provide corrosion data for the duration of the test or until the probes fail. This report provides an update describing the current status of the test and documents results to date. Data from the one-year and three-year results are also included, for comparison and evaluation of trends. In the six-year results, most metals being tested showed extremely low measurable rates of general corrosion. For Type 304L stainless steel, Type 316L stainless steel, Inconel 718, and Ferralium 255, corrosion rates fell in the range of “no reportable” to 0.0002 mils per year (MPY). Corrosion rates for Zircaloy-4 ranged from no measurable corrosion to 0.0001 MPY. These rates are two orders of magnitude lower than those specified in the performance assessment for the SDA. The corrosion on the carbon steel, beryllium, and aluminum were more evident with a clear difference in corrosion performance between the 4-ft and 10-ft levels. Notable surface corrosion products were evident as well as numerous pit initiation sites. Since the corrosion of the beryllium and aluminum is characterized by pitting, the geometrical character of the corrosion becomes more significant than the general corrosion rate. Both pitting factor and weight loss data should be used together. For six-year exposure, the maximum carbon steel corrosion rate was 0.3643 MPY while the maximum beryllium corrosion rate was 0.3282 MPY and the maximum aluminum corrosion rate was 0.0030 MPY.

M. K. Adler Flitton; C. W. Bishop; M. E. Delwiche; T. S. Yoder

2004-09-01T23:59:59.000Z

190

TEST RESULTS FROM GAMMA IRRADIATION OF ALUMINUM OXYHYDROXIDES  

SciTech Connect (OSTI)

Hydrated metal oxides or oxyhydroxides boehmite and gibbsite that can form on spent aluminum-clad nuclear fuel assemblies during in-core and post-discharge wet storage were exposed as granular powders to gamma irradiation in a {sup 60}Co irradiator in closed laboratory test vessels with air and with argon as separate cover gases. The results show that boehmite readily evolves hydrogen with exposure up to a dose of 1.8 x 10{sup 8} rad, the maximum tested, in both a full-dried and moist condition of the powder, whereas only a very small measurable quantity of hydrogen was generated from the granular powder of gibbsite. Specific information on the test setup, sample characteristics, sample preparation, irradiation, and gas analysis are described.

Fisher, D.; Westbrook, M.; Sindelar, R.

2012-02-01T23:59:59.000Z

191

Small-Scale Spray Releases: Orifice Plugging Test Results  

SciTech Connect (OSTI)

One of the events postulated in the hazard analysis at the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities, is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak involves extrapolating from correlations published in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids with Newtonian fluid behavior. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials present in the WTP and across processing facilities in the DOE complex. Two key technical areas were identified where testing results were needed to improve the technical basis by reducing the uncertainty introduced by extrapolating existing literature results. The first technical need was to quantify the role of slurry particles in small breaches in which the slurry particles may plug and result in substantially reduced, or even negligible, respirable fraction formed by high pressure sprays. The second technical need was to determine the aerosol droplet size distribution and volume from prototypic breaches and fluids, specifically including sprays from larger breaches with slurries where data from the literature are largely absent. To address these technical areas, small- and large-scale test stands were constructed and operated with simulants to determine the aerosol release fractions and aerosol generation rates from a range of breach sizes and geometries. The properties of the simulants represented the range of properties expected in the WTP process streams and included water, sodium salt solutions, slurries containing boehmite or gibbsite, and a hazardous chemical simulant. The effect of anti-foam agents (AFA) was assessed with most of the simulants. Orifices included round holes and rectangular slots. Much of the testing was conducted at pressures of 200 and 380 psi, but some tests were conducted at 100 psi. Testing the largest postulated breaches was deemed impractical because of the large size of some of the WTP equipment. The purpose of the study described in this report is to provide experimental data for the first key technical area, potential plugging of small breaches, by performing small-scale tests with a range of orifice sizes and orientations representative of the WTP conditions. The simulants used were chosen to represent the range of process stream properties in the WTP. Testing conducted after the plugging tests in the small- and large-scale test stands addresses the second key technical area, aerosol generation. The results of the small-scale aerosol generation tests are included in Mahoney et al. 2012. The area of spray generation from large breaches is covered by large-scale testing in Schonewill et al. 2012.

Mahoney, Lenna A.; Gauglitz, Phillip A.; Blanchard, Jeremy; Kimura, Marcia L.; Kurath, Dean E.

2012-09-01T23:59:59.000Z

192

DUS II SOIL GAS SAMPLING AND AIR INJECTION TEST RESULTS  

SciTech Connect (OSTI)

Soil vapor extraction (SVE) and air injection well testing was performed at the Dynamic Underground Stripping (DUS) site located near the M-Area Settling Basin (referred to as DUS II in this report). The objective of this testing was to determine the effectiveness of continued operation of these systems. Steam injection ended on September 19, 2009 and since this time the extraction operations have utilized residual heat that is present in the subsurface. The well testing campaign began on June 5, 2012 and was completed on June 25, 2012. Thirty-two (32) SVE wells were purged for 24 hours or longer using the active soil vapor extraction (ASVE) system at the DUS II site. During each test five or more soil gas samples were collected from each well and analyzed for target volatile organic compounds (VOCs). The DUS II site is divided into four parcels (see Figure 1) and soil gas sample results show the majority of residual VOC contamination remains in Parcel 1 with lesser amounts in the other three parcels. Several VOCs, including tetrachloroethylene (PCE) and trichloroethylene (TCE), were detected. PCE was the major VOC with lesser amounts of TCE. Most soil gas concentrations of PCE ranged from 0 to 60 ppmv with one well (VEW-22A) as high as 200 ppmv. Air sparging (AS) generally involves the injection of air into the aquifer through either vertical or horizontal wells. AS is coupled with SVE systems when contaminant recovery is necessary. While traditional air sparging (AS) is not a primary component of the DUS process, following the cessation of steam injection, eight (8) of the sixty-three (63) steam injection wells were used to inject air. These wells were previously used for hydrous pyrolysis oxidation (HPO) as part of the DUS process. Air sparging is different from the HPO operations in that the air was injected at a higher rate (20 to 50 scfm) versus HPO (1 to 2 scfm). . At the DUS II site the air injection wells were tested to determine if air sparging affected VOC soil gas concentrations during ASVE. Five (5) SVE wells that were located closest to the air injection wells were used as monitoring points during the air sparging tests. The air sparging tests lasted 48 hours. Soil gas sample results indicate that sparging did not affect VOC concentrations in four of the five sparging wells, while results from one test did show an increase in soil gas concentrations.

Noonkester, J.; Jackson, D.; Jones, W.; Hyde, W.; Kohn, J.; Walker, R.

2012-09-20T23:59:59.000Z

193

E-Print Network 3.0 - accelerated aging tests Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

tests Search Powered by Explorit Topic List Advanced Search Sample search results for: accelerated aging tests...

194

Large-Scale Spray Releases: Additional Aerosol Test Results  

SciTech Connect (OSTI)

One of the events postulated in the hazard analysis for the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak event involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids that behave as a Newtonian fluid. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and in processing facilities across the DOE complex. To expand the data set upon which the WTP accident and safety analyses were based, an aerosol spray leak testing program was conducted by Pacific Northwest National Laboratory (PNNL). PNNL’s test program addressed two key technical areas to improve the WTP methodology (Larson and Allen 2010). The first technical area was to quantify the role of slurry particles in small breaches where slurry particles may plug the hole and prevent high-pressure sprays. The results from an effort to address this first technical area can be found in Mahoney et al. (2012a). The second technical area was to determine aerosol droplet size distribution and total droplet volume from prototypic breaches and fluids, including sprays from larger breaches and sprays of slurries for which literature data are mostly absent. To address the second technical area, the testing program collected aerosol generation data at two scales, commonly referred to as small-scale and large-scale testing. The small-scale testing and resultant data are described in Mahoney et al. (2012b), and the large-scale testing and resultant data are presented in Schonewill et al. (2012). In tests at both scales, simulants were used to mimic the relevant physical properties projected for actual WTP process streams.

Daniel, Richard C.; Gauglitz, Phillip A.; Burns, Carolyn A.; Fountain, Matthew S.; Shimskey, Rick W.; Billing, Justin M.; Bontha, Jagannadha R.; Kurath, Dean E.; Jenks, Jeromy WJ; MacFarlan, Paul J.; Mahoney, Lenna A.

2013-08-01T23:59:59.000Z

195

Clean Cities Offers Fleets New Tool to Evaluate Benefits of Alternative Fuel Vehicles  

Broader source: Energy.gov [DOE]

The AFLEET Tool allows fleets to calculate payback periods and emissions benefits of alternative fuel vehicles.

196

Evaluation of Smart Irrigation Controllers: Initial Bench Testing Results  

E-Print Network [OSTI]

-site weather station equipped with senors that record temperature, relative humidity (or dew point temperature) wind speed and solar radiation for use in calculating ETo with a form of the Penman equation. 4 MATERIALS AND METHODS Testing Equipment... in College Station, TX. The weather parameters were measured with a standard agricultural weather station which records temperature, solar radiation, wind and relative humidity. The ETo was computed using the standardized Penman-Monteith method. 7 RESULTS...

Swanson, Charles; Fipps, Guy

197

Small-Scale Spray Releases: Additional Aerosol Test Results  

SciTech Connect (OSTI)

One of the events postulated in the hazard analysis at the Waste Treatment and Immobilization Plant (WTP) and other U.S. Department of Energy (DOE) nuclear facilities is a breach in process piping that produces aerosols with droplet sizes in the respirable range. The current approach for predicting the size and concentration of aerosols produced in a spray leak involves extrapolating from correlations reported in the literature. These correlations are based on results obtained from small engineered spray nozzles using pure liquids with Newtonian fluid behavior. The narrow ranges of physical properties on which the correlations are based do not cover the wide range of slurries and viscous materials that will be processed in the WTP and across processing facilities in the DOE complex. To expand the data set upon which the WTP accident and safety analyses were based, an aerosol spray leak testing program was conducted by Pacific Northwest National Laboratory (PNNL). PNNL’s test program addressed two key technical areas to improve the WTP methodology (Larson and Allen 2010). The first technical area was to quantify the role of slurry particles in small breaches where slurry particles may plug the hole and prevent high-pressure sprays. The results from an effort to address this first technical area can be found in Mahoney et al. (2012a). The second technical area was to determine aerosol droplet size distribution and total droplet volume from prototypic breaches and fluids, including sprays from larger breaches and sprays of slurries for which literature data are largely absent. To address the second technical area, the testing program collected aerosol generation data at two scales, commonly referred to as small-scale and large-scale. The small-scale testing and resultant data are described in Mahoney et al. (2012b) and the large-scale testing and resultant data are presented in Schonewill et al. (2012). In tests at both scales, simulants were used to mimic the relevant physical properties projected for actual WTP process streams.

Schonewill, Philip P.; Gauglitz, Phillip A.; Kimura, Marcia L.; Brown, G. N.; Mahoney, Lenna A.; Tran, Diana N.; Burns, Carolyn A.; Kurath, Dean E.

2013-08-01T23:59:59.000Z

198

2011 Nissan Leaf BEV Accelerated Testing - June 2013  

Broader source: Energy.gov (indexed) [DOE]

Nissan Leaf BEV Accelerated Testing - June 2013 Two model year 2011 Nissan Leaf battery electric vehicles (BEVs) entered Accelerated testing during March 2011 in a fleet in...

199

Toyota Gen III Prius Hybrid Electric Vehicle Accelerated Testing...  

Broader source: Energy.gov (indexed) [DOE]

HEV Accelerated Testing - September 2011 Two model year 2010 Toyota Generation III Prius hybrid electric vehicles (HEVs) entered Accelerated testing during July 2009 in a fleet in...

200

Audit Report VEHICLE FLEET MANAGEMENT AT THE IDAHO NATIONALENGINEERING...  

Broader source: Energy.gov (indexed) [DOE]

In a prior report, Audit of Light Vehicle Fleet Management at the Idaho National Engineering Laboratory, WR-B-93-7, September 29, 1993, the Office of Inspector General...

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

activity federal fleet: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to dictate the time at which they are replaced. This additional information 110 2003 REPORT TO THE FLEET OCTOBER 2003 PAGE 37 Annual Report: IFQ Fee (Cost Recovery) Program...

202

Dynamic incentive scheme for rental vehicle fleet management  

E-Print Network [OSTI]

Mobility on Demand is a new transportation paradigm aimed to provide sustainable transportation in urban settings with a fleet of electric vehicles. Usage scenarios prpopsed by Mobility on Demand systems must allow one-way ...

Zhou, SiZhi

2012-01-01T23:59:59.000Z

203

Biofuels, Climate Policy and the European Vehicle Fleet  

E-Print Network [OSTI]

We examine the effect of biofuels mandates and climate policy on the European vehicle fleet, considering the prospects for diesel and gasoline vehicles. We use the MIT Emissions Prediction and Policy Analysis (EPPA) model, ...

Rausch, Sebastian

204

Business Case for Compressed Natural Gas in Municipal Fleets  

SciTech Connect (OSTI)

This report describes how NREL used the CNG Vehicle and Infrastructure Cash-Flow Evaluation (VICE) model to establish guidance for fleets making decisions about using compressed natural gas.

Johnson, C.

2010-06-01T23:59:59.000Z

205

Merit Review: EPAct State and Alternative Fuel Provider Fleets...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

D.C. ti13ohara.pdf More Documents & Publications Merit Review: EPAct State and Alternative Fuel Provider Fleets 2012 Merit Review: EPAct State and Alternative Fuel Provider...

206

Vehicle Technologies Office Merit Review 2013: Fleet DNA  

Broader source: Energy.gov [DOE]

Presentation given by the National Renewable Energy Laboratory (NREL) at the 2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting about a tool for analyzing fleet characteristics.

207

Vehicle Technologies Office Merit Review 2014: Fleet DNA  

Broader source: Energy.gov [DOE]

Presentation given by National Renewable Energy Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about fleet DNA.

208

Network design and fleet allocation model for vessel operation  

E-Print Network [OSTI]

Containership operators in the U.S. are confronted with a number of problems in the way they make critical fleet allocation decisions to meet the increase of shippers' demands. Instead of the empirical approach, this ...

Li, Xiaojing, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

209

Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Pilot-Scale Test Results  

SciTech Connect (OSTI)

This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, ''Field Testing of a Wet FGD Additive.'' The objective of the project is to demonstrate the use of a flue gas desulfurization (FGD) additive, Degussa Corporation's TMT-15, to prevent the reemissions of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate that the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine TMT salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project will conduct pilot and full-scale tests of the TMT-15 additive in wet FGD absorbers. The tests are intended to determine required additive dosage requirements to prevent Hg{sup 0} reemissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Power River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, TXU Generation Company LP, Southern Company, and Degussa Corporation. TXU Generation has provided the Texas lignite/PRB co-fired test site for pilot FGD tests, Monticello Steam Electric Station Unit 3. Southern Company is providing the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot and full-scale jet bubbling reactor (JBR) FGD systems to be tested. A third utility, to be named later, will provide the high-sulfur Eastern bituminous coal full-scale FGD test site. Degussa Corporation is providing the TMT-15 additive and technical support to the test program. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High Sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. This topical report presents the results from the Task 2 and Task 4 pilot-scale additive tests. The Task 3 and Task 5 full-scale additive tests will be conducted later in calendar year 2006.

Gary M. Blythe

2006-03-01T23:59:59.000Z

210

National Federal Fleet Loaner Program, Interim Status Report  

SciTech Connect (OSTI)

The goal of the U.S. Department of Energy's (DOE) Loaner Program is to increase the awareness, deployment, and use of electric vehicles (EVs) in Federal fleets. The Loaner Program accomplishes this by providing free EVs to Federal fleets on a loaner basis, generally for 1 or 2 months. The Program partners DOE with six electric utilities, with DOE providing financial support and some leads on Federal fleets interested in obtaining EVs. The utilities obtain the vehicles, identify candidate loaner fleets, loan the vehicles, provide temporary charging infrastructure, provide overall support to participating Federal fleets, and support fleets with their leasing decisions. While the utilities have not had the success initially envisioned by themselves, DOE, the Edison Electric Institute, and the Electric Vehicle Association of the Americas, the utilities can not be faulted for their efforts, as they are not the entity that makes the ultimate lease or no-lease decision. Some external groups have suggested to DOE that they direct other federal agencies to change their processes to make loaning vehicles easier; this is simply not within the power of DOE. By law, a certain percentage of all new vehicle acquisitions are supposed to be alternative fuel vehicles (AFV); however, with no enforcement, the federal agencies are not compelled to lease AFVs such as electric vehicles.

Francfort, James Edward

2000-10-01T23:59:59.000Z

211

Test Results of the Luminosity Monitors for the LHC  

SciTech Connect (OSTI)

The Luminosity Monitor for the LHC has been built at LBNL and will be operational in the LHC during the upcoming run. The device, a gas ionization chamber, is installed in the high luminosity regions (those dedicated to the ATLAS and CMS experiments) and capable to resolve bunch-by-bunch luminosity as well as survive extreme levels of radiation. During the experimental R&D phase of its design, a prototype of this detector has been tested extensively at the ALS, in RHIC as well as in the SPS. Results of these experiments are presented here.

Beche, J.F.; Byrd, J. M.; Doolittle, L.; Manfredi, P. F.; Matis, H. S.; Monroy, M.; Ratti, A.; Stezelberger, T.; Stiller, J.; Turner, W.; Yaver, H.; Drees, A.; Bravin, E.

2009-05-04T23:59:59.000Z

212

Assessing Equivalent Viscous Damping Using Piping System test Results  

SciTech Connect (OSTI)

The specification of damping for nuclear piping systems subject to seismic-induced motions has been the subject of many studies and much controversy. Damping estimation based on test data can be influenced by numerous factors, consequently leading to considerable scatter in damping estimates in the literature. At present, nuclear industry recommendations and nuclear regulatory guidance are not consistent on the treatment of damping for analysis of nuclear piping systems. Therefore, there is still a need to develop a more complete and consistent technical basis for specification of appropriate damping values for use in design and analysis. This paper summarizes the results of recent damping studies conducted at Brookhaven National Laboratory.

Nie, J.; Morante, R.

2010-07-18T23:59:59.000Z

213

Hydrologic testing methodology and results from deep basalt boreholes  

SciTech Connect (OSTI)

The objective of the hydrologic field-testing program is to provide data for characterization of the groundwater systems wihin the Pasco Basin that are significant to understanding waste isolation. The effort is directed toward characterizing the areal and vertical distributions of hydraulic head, hydraulic properties, and hydrochemistry. Data obtained from these studies provide input for numerical modeling of groundwater flow and solute transport. These models are then used for evaluating potential waste migration as a function of space and time. The groundwater system beneath the Hanford Site and surrounding area consists of a thick, accordantly layered sequence of basalt flows and associated sedimentary interbed that primarily occur in the upper part of the Columbia River basalt. Permeable horizons of the sequence are associated with the interbeds and the interflow zones within the basalt. The columnar interiors of a flow act as low-permeability aquitards, separating the more-permeable interflows or interbeds. This paper discusses the hydrologic field-gathering activities, specifically, field-testing methodology and test results from deep basalt boreholes.

Strait, S R; Spane, F A; Jackson, R L; Pidcoe, W W

1982-05-01T23:59:59.000Z

214

Operational Results of a Closed Brayton Cycle Test-Loop  

SciTech Connect (OSTI)

A number of space and terrestrial power system designs plan to use nuclear reactors that are coupled to Closed-loop Brayton Cycle (CBC) systems to generate electrical power. Because very little experience exists regarding the operational behavior of these systems, Sandia National Laboratories (through its Laboratory Directed Research and Development program) is developing a closed-loop test bed that can be used to determine the operational behavior of these systems and to validate models for these systems. Sandia has contracted Barber-Nichols Corporation to design, fabricate, and assemble a Closed-loop Brayton Cycle (CBC) system. This system was developed by modifying commercially available hardware. It uses a 30 kWe Capstone C-30 gas-turbine unit (www.capstoneturbine.com) with a modified housing that permits the attachment of an electrical heater and a water cooled chiller that are connected to the turbo-machinery in a closed loop. The test-loop reuses the Capstone turbine, compressor, and alternator. The Capstone system's nominal operating point is 1150 K turbine inlet temperature at 96,000 rpm. The annular recuperator and portions of the Capstone control system (inverter) and starter system are also reused. The rotational speed of the turbo-machinery is controlled either by adjusting the alternator load by either using the electrical grid or a separate load bank. This report describes the test-loop hardware SBL-30 (Sandia Brayton Loop-30kWe). Also presented are results of early testing and modeling of the unit. The SBL-30 hardware is currently configured with a heater that is limited to 80 kWth with a maximum outlet temperature of {approx}1000 K.

Wright, Steven A.; Lipinski, Ronald J.; Brown, Nicholas [Sandia National Laboratories, Org 6872 MS-1146, PO Box 5800 Albuquerque, New Mexico 87185 (United States); Fuller, Robert; Nichols, Kenneth [Barber Nichols 6325 W 55th Ave., Arvada, Colorado 80002 (United States)

2005-02-06T23:59:59.000Z

215

Operational results of a Closed Brayton Cycle test-loop.  

SciTech Connect (OSTI)

A number of space and terrestrial power system designs plan to use nuclear reactors that are coupled to Closed-loop Brayton Cycle (CBC) systems to generate electrical power. Because very little experience exists regarding the operational behavior of these systems, Sandia National Laboratories (through its Laboratory Directed Research and Development program) is developing a closed-loop test bed that can be used to determine the operational behavior of these systems and to validate models for these systems. Sandia has contracted Barber-Nichols Corporation to design, fabricate, and assemble a Closed-loop Brayton Cycle (CBC) system. This system was developed by modifying commercially available hardware. It uses a 30 kWe Capstone C-30 gas-turbine unit (www.capstoneturbine.com) with a modified housing that permits the attachment of an electrical heater and a water cooled chiller that are connected to the turbo-machinery in a closed loop. The test-loop reuses the Capstone turbine, compressor, and alternator. The Capstone system's nominal operating point is 1150 K turbine inlet temperature at 96,000 rpm. The annular recuperator and portions of the Capstone control system (inverter) and starter system are also reused. The rotational speed of the turbo-machinery is controlled either by adjusting the alternator load by either using the electrical grid or a separate load bank. This report describes the test-loop hardware SBL-30 (Sandia Brayton Loop-30kWe). Also presented are results of early testing and modeling of the unit. The SBL-30 hardware is currently configured with a heater that is limited to 80 kW{sub th} with a maximum outlet temperature of {approx}1000 K.

Fuller, Robert (Barber Nichols, Arvada, Colorado); Wright, Steven Alan; Nichols, Kenneth Graham. (Barber Nichols, Arvada, Colorado); Brown, Nicholas; Lipinski, Ronald J.

2004-11-01T23:59:59.000Z

216

Tc-99 Adsorption on Selected Activated Carbons - Batch Testing Results  

SciTech Connect (OSTI)

CH2M HILL Plateau Remediation Company (CHPRC) is currently developing a 200-West Area groundwater pump-and-treat system as the remedial action selected under the Comprehensive Environmental Response, Compensation, and Liability Act Record of Decision for Operable Unit (OU) 200-ZP-1. This report documents the results of treatability tests Pacific Northwest National Laboratory researchers conducted to quantify the ability of selected activated carbon products (or carbons) to adsorb technetium-99 (Tc-99) from 200-West Area groundwater. The Tc-99 adsorption performance of seven activated carbons (J177601 Calgon Fitrasorb 400, J177606 Siemens AC1230AWC, J177609 Carbon Resources CR-1240-AW, J177611 General Carbon GC20X50, J177612 Norit GAC830, J177613 Norit GAC830, and J177617 Nucon LW1230) were evaluated using water from well 299-W19-36. Four of the best performing carbons (J177606 Siemens AC1230AWC, J177609 Carbon Resources CR-1240-AW, J177611 General Carbon GC20X50, and J177613 Norit GAC830) were selected for batch isotherm testing. The batch isotherm tests on four of the selected carbons indicated that under lower nitrate concentration conditions (382 mg/L), Kd values ranged from 6,000 to 20,000 mL/g. In comparison. Under higher nitrate (750 mg/L) conditions, there was a measureable decrease in Tc-99 adsorption with Kd values ranging from 3,000 to 7,000 mL/g. The adsorption data fit both the Langmuir and the Freundlich equations. Supplemental tests were conducted using the two carbons that demonstrated the highest adsorption capacity to resolve the issue of the best fit isotherm. These tests indicated that Langmuir isotherms provided the best fit for Tc-99 adsorption under low nitrate concentration conditions. At the design basis concentration of Tc 0.865 µg/L(14,700 pCi/L), the predicted Kd values from using Langmuir isotherm constants were 5,980 mL/g and 6,870 mL/g for for the two carbons. These Kd values did not meet the target Kd value of 9,000 mL/g. Tests conducted to ascertain the effects of changing pH showed that at pH values of 6.5 and 7.5, no significant differences existed in Tc-adsorption performance for three of the carbons, but the fourth carbon performed better at pH 7.5. When the pH was increased to 8.5, a slight decline in performance was observed for all carbons. Tests conducted to ascertain the temperature effect on Tc-99 adsorption indicated that at 21 ºC, 27 ºC, and 32 ºC there were no significant differences in Tc-99 adsorption for three of the carbons. The fourth carbon showed a noticeable decline in Tc-99 adsorption performance with increasing temperature. The presence of volatile organic compounds (VOCs) in the source water did not significantly affect Tc-99 adsorption on either of two carbons tested. Technetium-99 adsorption differed by less than 15% with or without VOCs present in the test water, indicating that Tc-99 adsorption would not be significantly affected if VOCs were removed from the water prior to contact with carbon.

Mattigod, Shas V.; Wellman, Dawn M.; Golovich, Elizabeth C.; Cordova, Elsa A.; Smith, Ronald M.

2010-12-01T23:59:59.000Z

217

U.S. Department of Energy -- Advanced Vehicle Testing Activity: Plug-in Hybrid Electric Vehicle Testing and Demonstration Activities  

SciTech Connect (OSTI)

The U.S. Department of Energy’s (DOE) Advanced Vehicle Testing Activity (AVTA) tests plug-in hybrid electric vehicles (PHEV) in closed track, dynamometer and onroad testing environments. The onroad testing includes the use of dedicated drivers on repeated urban and highway driving cycles that range from 10 to 200 miles, with recharging between each loop. Fleet demonstrations with onboard data collectors are also ongoing with PHEVs operating in several dozen states and Canadian Provinces, during which trips- and miles-per-charge, charging demand and energy profiles, and miles-per-gallon and miles-per-kilowatt-hour fuel use results are all documented, allowing an understanding of fuel use when vehicles are operated in charge depleting, charge sustaining, and mixed charge modes. The intent of the PHEV testing includes documenting the petroleum reduction potential of the PHEV concept, the infrastructure requirements, and operator recharging influences and profiles. As of May 2008, the AVTA has conducted track and dynamometer testing on six PHEV conversion models and fleet testing on 70 PHEVs representing nine PHEV conversion models. A total of 150 PHEVs will be in fleet testing by the end of 2008, all with onboard data loggers. The onroad testing to date has demonstrated 100+ miles per gallon results in mostly urban applications for approximately the first 40 miles of PHEV operations. The primary goal of the AVTA is to provide advanced technology vehicle performance benchmark data for technology modelers, research and development programs, and technology goal setters. The AVTA testing results also assist fleet managers in making informed vehicle purchase, deployment and operating decisions. The AVTA is part of DOE’s Vehicle Technologies Program. These AVTA testing activities are conducted by the Idaho National Laboratory and Electric Transportation Engineering Corporation, with Argonne National Laboratory providing dynamometer testing support. The proposed paper and presentation will discuss PHEV testing activities and results. INL/CON-08-14333

James E. Francfort; Donald Karner; John G. Smart

2009-05-01T23:59:59.000Z

218

CleanFleet. Final report: Volume 3, vehicle maintenance and durability  

SciTech Connect (OSTI)

CleanFleet is a demonstration of panel vans operating on five alternative motorfuels in commercial package delivery operations in the South Coast Air Basin of California. The five alternative fuels are propane gas, compressed natural gas (CNG), California Phase 2 reformulated gasoline (RFG), methanol (M-85 with 15 percent RFG), and electricity. Data were gathered on in-use emissions, operations, and fleet economics. This volume of the final report summarizes the maintenance required on these vans from the time they were introduced into the demonstration (April through early November 1992) until the end of the demonstration in September 1994. The vans were used successfully in FedEx operations; but, to varying degrees, the alternative fuel vehicles required more maintenance than the unleaded gasoline control vehicles. The maintenance required was generally associated with the development state of the fuel-related systems. During the demonstration, no non-preventive maintenance was required on the highly developed fuel-related systems in any of the unleaded gasoline production vehicles used either as controls or as RFG test vehicles. The maintenance problems encountered with the less developed systems used in this demonstration may persist in the short term with vehicles featuring the same or similar systems. This means that fleet operators planning near-term acquisitions of vehicles incorporating such systems should consider the potential for similar problems when (1) selecting vendors and warranty provisions and (2) planning maintenance programs.

NONE

1995-12-01T23:59:59.000Z

219

Advanced Vehicle Testing Activity (AVTA) Data and Results  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office (VTO) supports work to develop test procedures and carry out testing on a wide range of advanced vehicles and technologies through the Advanced Vehicle Testing...

220

Test Procedure for 170.302.h Incorporate Laboratory Test Results APPROVED Version 1.1 September 24, 2010  

E-Print Network [OSTI]

Test Procedure for §170.302.h Incorporate Laboratory Test Results APPROVED Version 1.1 September 24, 2010 1 Test Procedure for §170.302 (h) Incorporate Laboratory Test Results This document describes the test procedure for evaluating conformance of complete EHRs or EHR modules1

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

End Result TestingEnd Result Testing PCCPPCCP NCNC22 Spring Meeting @ Baton Rouge, LASpring Meeting @ Baton Rouge, LA  

E-Print Network [OSTI]

diameter #12;Fresh Concrete TestsFresh Concrete Tests Performed the following:Performed the following) -- Temperature (ASTM C 1064)Temperature (ASTM C 1064) #12;Harden Concrete TestingHarden Concrete TestingBeams cured in lime water -- Pre and Post PaverPre and Post Paver #12;Harden Concrete TestingHarden Concrete

222

PROTEC TM TEAR-OFFS: RESULTS OF LONG TERM TESTING  

SciTech Connect (OSTI)

The Savannah River National Laboratory (SRNL) has completed a series of tests (Phases 1 and 2) to assess the potential use of a Mylar{reg_sign} tear-off system as a primary or secondary protective barrier to minimize acid etching ('frosting'), accidental scratching, and/or radiation damage for shielded cells, glovebox, and/or chemical hood windows. Conceptually, thin, multi-layered sheets of Mylar (referred to throughout this report as the ProTec{trademark} tear-off system) can be directly applied to the shielded cell, glovebox, or hood sash window to serve as a secondary (or primary) barrier. Upon degradation of visual clarity due to accidental scratching, spills/splatters, and/or radiation damage, the outer layer (or sheet) of Mylar could be removed refreshing or restoring the view. Due to the multilayer aspect, the remaining Mylar layers would provide continued protection for the window from potential reoccurrences. Although the concept of using a tear-off system as a protective barrier is conceptually enticing, potential technical issues were identified and addressed as part of this phased study to support implementation of this type of system in the Defense Waste Processing Facility (DWPF). Specific test conditions of interest to the DWPF included the performance of the tear-off system exposed to or under the following conditions: (1) acid(s) (concentrated (28.9 M) HF, concentrated (15.9M) HNO{sub 3}, 6M HCl, and 0.6M H{sub 3}BO{sub 3}); (2) base (based on handling of radioactive sludges with pH of {approx}12-13); (3) gamma radiation (due to radioactive sources or materials being used in the analytical cells); (4) scratch resistance (simulating accidental scratching with the manipulators); and (5) in-situ testing (sample coupons exposed to actual field conditions in DWPF). The results of the Phase 1 study indicated that the ProTec tear-off concept (as a primary or secondary protective barrier) is a potential technical solution to prevent or retard excessive damage that would result from acid etching, base damage (as a result of a sludge spill or splatter), gamma radiation damage, and/or accidental scratching (due to manipulator/tool contact). Although identified as a potential solution, the Phase 1 testing was relatively short-term with exposure times up to 1-2 months for the acid and gamma radiation tests. Phase 2 testing included longer exposure times for the acid resistance (up to 456 days) and gamma radiation exposure (700 days with a cumulative gamma dose of {approx}3.1 x 10{sup 5} rad) assessments. The tear-off system continued to perform well in these longer-term acid resistance testing and gamma exposure conditions. Complete removal of the tear-offs after these long-term exposure times indicate that not only could visual clarity be restored but the mechanical integrity could be retained. The results also provided insight into the ability of the ProTec tear-off system to withstand the chemical and physical abuses expected in off-normal shielded cells operations. The conceptual erasing of scratches or marks by excessive manipulator abuse was demonstrated in the SRNL Shielded Cells mock-up facility through the removal of the outer layer tear-off with manipulators. In addition, the Phase 2 testing included an in-situ assessment of a prototype tear-off system in the DWPF Sampling Cells where the system was exposed to actual field conditions including radioactive sources, acidic and basic environments, dusting, and chemical cleaning solutions over a 5-6 month period. DWPF personnel were extremely satisfied with the performance (including the successful removal of 3 layers with manipulators) of the ProTec tear-off system under actual field conditions. The successful removal of the outer layer tear-offs with the manipulator, using tabs not specifically designed for remote operations, demonstrates that the system is 'manipulator-friendly' and could be implemented in a remote environment. The ability to remove the outer layer tear-off not only regains visual clarity but also reduces waste disposal volumes (i.e., dispo

Peeler, D

2008-07-24T23:59:59.000Z

223

Np Behavior in Synthesized Uranyl Phases: Results of Initial Tests  

SciTech Connect (OSTI)

Initial tests were completed at Pacific Northwest National Laboratory for developing a potential mechanism to retard the mobility of neptunium at the Yucca Mountain repository. Neptunium is of concern because of its mobility in the environment and long half life, contributing a large percentage of the potential dose over extended times at the perimeter of the site. The mobility of neptunium could be retarded by associating with uranium mineral phases. The following four uranium mineral phases were examined and are potential secondary phases expected to form as a result of interactions of spent nuclear fuel with the local environment: meta-schoepite, studtite, uranophane, and sodium boltwoodite. The fate of the neptunium was examined in these synthetic experiments.

Friese, Judah I.; Douglas, Matthew; McNamara, Bruce K.; Clark, Sue B.; Hanson, Brady D.

2004-09-28T23:59:59.000Z

224

105K West Isolation Barrier Acceptance Test results  

SciTech Connect (OSTI)

The objective of this document is to report and interpret the findings of the isolation barrier acceptance tests performed in 105KW/100K. The tests were performed in accordance with the test plan and acceptance test procedure. The test report contains the test data. This document compares the test data against the criteria. A discussion of the leak rate analytical characterization describes how the flow characteristics flow rate will be determined using the test data from the test report. Two modes of water loss were considered; basin and/or discharge chute leakage, and evaporation. An initial test established baseline leakage data and instrumentation performance. Test 2 evaluated the sealing performance of the isolation barrier by inducing an 11 in. (27.9 cm) level differential across the barrier. The leak rate at this 11 in. (27.9 cm) level is extrapolated to the 16 ft. (4.9 m) level differential postulated in the DBE post seismic event. If the leak rate, adjusted for evaporation and basin leakage (determined from Test 1), is less than the SAR limit of 1,500 gph (5,680 lph) at a 16 ft (4.9 m) level differential, the barriers pass the acceptance test.

McCracken, K.J. [ICF Kaiser Hanford Co., Richland, WA (United States); Irwin, J.J. [Westinghouse Hanford Co., Richland, WA (United States)

1995-05-18T23:59:59.000Z

225

In-Plane Conductivity Testing Procedures and Results  

Broader source: Energy.gov [DOE]

This presentation on conductivity testing was given at the High Temperature Membrane Working Group Meeting in May 2007.

226

Results of IEC 62804 Draft Round Robin Testing (Presentation)  

SciTech Connect (OSTI)

Three crystalline silicon module designs were distributed in five replicas each to five laboratories for testing according to the IEC 62804 (Committee Draft) system voltage durability qualification test for crystalline silicon photovoltaic (PV) modules. The stress tests were performed in environmental chambers at 60 degrees C, 85% relative humidity, 96 h, and with module nameplate system voltage applied.

Hacke, P.; Terwilliger, K.; Koch, S.; Weber, T.; Berghold, J.; Hoffmann, S.; Koehl, M.; Dietrich, S.; Mathiak, G.; Ebert, M.

2013-09-01T23:59:59.000Z

227

Monthly Summary Results for the Chrysler RAM PHEV Fleet  

Broader source: Energy.gov (indexed) [DOE]

Overall gasoline fuel economy (mpg) 19 Overall AC electrical energy consumption (AC Whmi) 85 Overall DC electrical energy consumption (DC Whmi) 54 Overall DC electrical...

228

Monthly Summary Results for the Chrysler RAM PHEV Fleet  

Broader source: Energy.gov (indexed) [DOE]

1 Overall DC electrical energy consumption (DC Whmi) 65 Overall DC electrical energy captured from regenerative braking (DC Whmi) 45 Total number of trips 10,555 Total distance...

229

Monthly Summary Results for the Chrysler RAM PHEV Fleet  

Broader source: Energy.gov (indexed) [DOE]

87 Overall DC electrical energy consumption (DC Whmi) 54 Overall DC electrical energy captured from regenerative braking (DC Whmi) 47 Total number of trips 6,560 Total distance...

230

Monthly Summary Results for the Chrysler RAM PHEV Fleet  

Broader source: Energy.gov (indexed) [DOE]

3 Overall DC electrical energy consumption (DC Whmi) 71 Overall DC electrical energy captured from regenerative braking (DC Whmi) 43 Total number of trips 13,167 Total distance...

231

Monthly Summary Results for the Chrysler RAM PHEV Fleet  

Broader source: Energy.gov (indexed) [DOE]

Overall gasoline fuel economy (mpg) 19 Overall AC electrical energy consumption (AC Whmi) 181 Overall DC electrical energy consumption (DC Whmi) 104 Overall DC electrical...

232

Monthly Summary Results for the Chrysler RAM PHEV Fleet  

Broader source: Energy.gov (indexed) [DOE]

5 Overall AC electrical energy consumption (AC Whmi) 111 Overall DC electrical energy consumption (DC Whmi) 71 Overall DC electrical energy captured from regenerative braking...

233

Monthly Summary Results for the Chrysler RAM PHEV Fleet  

Broader source: Energy.gov (indexed) [DOE]

Overall gasoline fuel economy (mpg) 21 Overall AC electrical energy consumption (AC Whmi) 93 Overall DC electrical energy consumption (DC Whmi) 71 Overall DC electrical...

234

Monthly Summary Results for the Chrysler RAM PHEV Fleet  

Broader source: Energy.gov (indexed) [DOE]

18 Overall DC electrical energy consumption (DC Whmi) 74 Overall DC electrical energy captured from regenerative braking (DC Whmi) 45 Total number of trips 11,462 Total...

235

Monthly Summary Results for the Chrysler RAM PHEV Fleet  

Broader source: Energy.gov (indexed) [DOE]

190 Overall DC electrical energy consumption (DC Whmi) 111 Overall DC electrical energy captured from regenerative braking (DC Whmi) 50 Total number of trips 2,055 Total...

236

Monthly Summary Results for the Chrysler RAM PHEV Fleet  

Broader source: Energy.gov (indexed) [DOE]

Overall gasoline fuel economy (mpg) 20 Overall AC electrical energy consumption (AC Whmi) 94 Overall DC electrical energy consumption (DC Whmi) 72 Overall DC electrical...

237

Monthly Summary Results for the Chrysler RAM PHEV Fleet  

Broader source: Energy.gov (indexed) [DOE]

Overall gasoline fuel economy (mpg) 19 Overall AC electrical energy consumption (AC Whmi) 104 Overall DC electrical energy consumption (DC Whmi) 70 Overall DC electrical...

238

Refueling Behavior of Flexible Fuel Vehicle Drivers in the Federal Fleet  

SciTech Connect (OSTI)

Federal fleets are a frequent subject of legislative and executive efforts to lead a national transition to alternative fuels and advanced vehicle technologies. Section 701 of the Energy Policy Act of 2005 requires that all dual-fueled alternative fuel vehicles in the federal fleet be operated on alternative fuel 100% of the time when they have access to it. However, in Fiscal Year (FY) 2012, drivers of federal flex fuel vehicles (FFV) leased through the General Services Administration refueled with E85 24% of the time when it was available--falling well short of the mandate. The U.S. Department of Energy's National Renewable Energy Laboratory completed a 2-year Laboratory Directed Research and Development project to identify the factors that influence the refueling behavior of federal FFV drivers. The project began with two primary hypotheses. First, information scarcity increases the tendency to miss opportunities to purchase E85. Second, even with perfect information, there are limits to how far drivers will go out of their way to purchase E85. This paper discusses the results of the project, which included a June 2012 survey of federal fleet drivers and an empirical analysis of actual refueling behavior from FY 2009 to 2012. This research will aid in the design and implementation of intervention programs aimed at increasing alternative fuel use and reducing petroleum consumption.

Daley, R.; Nangle, J.; Boeckman, G.; Miller, M.

2014-05-01T23:59:59.000Z

239

AVTA Voltec AC Level 1 and Level 2 Charging Systems Testing Results...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Eaton AC Level 2 Charging System Testing Results AVTA: Aerovironment AC Level 2 Charging System Testing Results AVTA: Siemens-VersiCharge AC Level 2 Charging System Testing Results...

240

H2-Assisted NOx Traps: Test Cell Results Vehicle Installations  

Broader source: Energy.gov (indexed) [DOE]

* New Power Supply * Under 250W consumption * Minimal heat rejected * Compact transformer * High-temperature flange seals * Reduced leakage 4 H2-Assisted NOx Trap: Test...

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Time and Temperature Test Results for PFP Thermal Stabilization Furnaces  

SciTech Connect (OSTI)

The national standard for plutonium storage acceptability (standard DOE-STD-3013-99, generally known as ''the 3013 standard'') has been revised to clarify the requirement for processes that will produce acceptable storage materials. The 3013 standard (Reference 1) now states that ''Oxides shall be stabilized by heating the material in an oxidizing atmosphere to a Material Temperature of at least 950 C (1742 F) for not less than 2 hours.'' The process currently in use for producing stable oxides for storage at the Plutonium Finishing Plant (PFP) heats a furnace atmosphere to 1000 C and holds it there for 2 hours. The temperature of the material being stabilized is not measured directly during this process. The Plutonium Process Support Laboratories (PPSL) were requested to demonstrate that the process currently in use at PFP is an acceptable method of producing stable plutonium dioxide consistently. A spare furnace identical to the production furnaces was set up and tested under varying conditions with non-radioactive surrogate materials. Reference 2 was issued to guide the testing program. The process currently in use at the PFP for stabilizing plutonium-bearing powders was shown to heat all the material in the furnace to at least 950 C for at least 2 hours. The current process will work for (1) relatively pure plutonium dioxide, (2) dioxide powders mixed with up to 20 weight percent magnesium oxide, and (3) dioxide powders with up to 11 weight percent magnesium oxide and 20 weight percent magnesium nitrate hexahydrate. Time and temperature data were also consistent with a successful demonstration for a mixture containing 10 weight percent each of sodium and potassium chloride; however, the molten chloride salts destroyed the thermocouples in the powder and temperature data were unavailable for part of that run. These results assume that the current operating limits of no more than 2500 grams per furnace charge and a powder height of no more than 1.5 inches remain in effect, although deeper powder beds (up to 2 inches) also yielded temperatures of greater than 950 C for longer than 2 hours.

COMPTON, J.A.

2000-08-09T23:59:59.000Z

242

Cone Penetrometer Load Cell Temperature and Radiation Testing Results  

SciTech Connect (OSTI)

This report summarizes testing activities performed at the Pacific Northwest National Laboratory to verify the cone penetrometer load cell can withstand the tank conditions present in 241-AN-101 and 241-AN-106. The tests demonstrated the load cell device will operate under the elevated temperature and radiation levels expected to be encountered during tank farm deployment of the device.

Follett, Jordan R.

2013-08-28T23:59:59.000Z

243

HEV Fleet Testing - Summary Fact Sheet for 2010 Ford Fusion  

Broader source: Energy.gov (indexed) [DOE]

Ford Fusion VIN 3FADP0L32AR194699 Vehicle Specifications Engine: 2.5 L 4-cylinder Electric Motor: 60 kW Battery: NiMH Seatbelt Positions: Five Payload: 850 lbs Features:...

244

HEV Fleet Testing - Summary Fact Sheet for 2010 Honda Insight  

Broader source: Energy.gov (indexed) [DOE]

courts, law offices, and medical facilities on city streets and urban freeways. Vehicle Specifications Engine: 1.3 L 4-cylinder Electric Motor: 10 kW Battery: NiMH Seatbelt...

245

HEV Fleet Testing - Summary Fact Sheet for 2010 Toyota Prius  

Broader source: Energy.gov (indexed) [DOE]

courts, law offices, and medical facilities on city streets and urban freeways. Vehicle Specifications Engine: 1.8 L 4-cylinder Electric Motor: 60 kW Battery: NiMH Seatbelt...

246

HEV Fleet Testing - Summary Fact Sheet 2011 Hyundai Sonata vin...  

Broader source: Energy.gov (indexed) [DOE]

Hyundai Sonata VIN KMHEC4A47BA003539 Vehicle Specifications Engine: 2.4 L Electric Motor: 30 kW Battery: Lithium Polymer Seatbelt Positions: Five Payload: 1074 lbs Features:...

247

HEV Fleet Testing - Summary Fact Sheet 2011 Hyundai Sonata vin...  

Broader source: Energy.gov (indexed) [DOE]

2011 Hyundai Sonata VIN KMHEC4A43BA004932 Vehicle Specifications Engine: 2.4 L Electric Motor: 30 kW Battery: Lithium Polymer Seatbelt Positions: Five Payload: 1074 lbs Features:...

248

HEV Fleet Testing - Summary Fact Sheet 2010 Toyota Prius  

Broader source: Energy.gov (indexed) [DOE]

Toyota Prius VIN JTDKN3DU2A5010462 Vehicle Specifications Engine: 1.8 L 4-cylinder Electric Motor: 60 kW Battery: NiMH Seatbelt Positions: Five Payload: 885 lbs Features:...

249

Fuel Cell Bus Takes a Starring Role in the BurbankBus Fleet,...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Bus Takes a Starring Role in the BurbankBus Fleet, Fuel Cell Technologies Program (FCTP) (Fact Sheet) Fuel Cell Bus Takes a Starring Role in the BurbankBus Fleet, Fuel Cell...

250

Fuel Cell Buses in U.S. Transit Fleets: Current Status 2012 ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Buses in U.S. Transit Fleets: Current Status 2012 Fuel Cell Buses in U.S. Transit Fleets: Current Status 2012 This report is the sixth in an annual series of reports that...

251

Clean Cities Coordinators and Stakeholders Awarded at the Green Fleet Conference and Expo  

Broader source: Energy.gov [DOE]

At the 2013 Green Fleet Conference and Expo, a number of Clean Cities coordinators and stakeholders received awards for their dedication to increasing the environmental sustainability of vehicle fleets.

252

U.S. Department of Energy Fleet Alternative Fuel Vehicle Acquisition...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fleet Alternative Fuel Vehicle Acquisition Report for Fiscal Year 2008 U.S. Department of Energy Fleet Alternative Fuel Vehicle Acquisition Report for Fiscal Year 2008 U.S....

253

Fuel Cell Buses in U.S. Transit Fleets: Summary of Experiences...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Buses in U.S. Transit Fleets: Summary of Experiences and Current Status Fuel Cell Buses in U.S. Transit Fleets: Summary of Experiences and Current Status This report...

254

BurbankBus' clean fuel fleet now includes a zero-emission hydrogen-fueled bus. BurbankBus, which provides transit  

E-Print Network [OSTI]

Bus fixed-route fleet consists of 17 compressed natural gas (CNG) buses. This fleet has been running on 100

255

REPORT on the TRUCK BRAKE LINING WORKSHOP and FLEET OPERATORS' SURVEY  

SciTech Connect (OSTI)

The report summarizes what transpired during brake linings-related workshop held at the Fall 2003 meeting of the Technology and Maintenance Council (TMC) in Charlotte, NC. The title of the workshop was ''Developing a Useful Friction Material Rating System''. It was organized by a team consisting of Peter Blau (Oak Ridge National Laboratory), Jim Britell (National Highway Traffic Safety Administration), and Jim Lawrence (Motor and Equipment Manufacturers Association). The workshop was held under the auspices of TMC Task Force S6 (Chassis), chaired by Joseph Stianche (Sanderson Farms, Inc.). Six invited speakers during the morning session provided varied perspectives on testing and rating aftermarket automotive and truck brake linings. They were: James R. Clark, Chief Engineer, Foundation Brakes and Wheel Equipment, Dana Corporation, Spicer Heavy Axle and Brake Division; Charles W. Greening, Jr, President, Greening Test Labs; Tim Duncan, General Manager, Link Testing Services;Dennis J. McNichol, President, Dennis NationaLease; Jim Fajerski, Business Manager, OE Sales and Applications Engineering, Federal Mogul Corporation; and Peter J. Blau, Senior Materials Development Engineer, Oak Ridge National Laboratory. The afternoon break-out sessions addressed nine questions concerning such issues as: ''Should the federal government regulate aftermarket lining quality?''; ''How many operators use RP 628, and if so, what's good or bad about it?''; and ''Would there be any value to you of a vocation-specific rating system?'' The opinions of each discussion group, consisting of 7-9 participants, were reported and consolidated in summary findings on each question. Some questions produced a greater degree of agreement than others. In general, the industry seems eager for more information that would allow those who are responsible for maintaining truck brakes to make better, more informed choices on aftermarket linings. A written fleet operator survey was also conducted during the TMC meeting. Twenty-one responses were received, spanning fleet sizes between 12 and 170,000 vehicles. Responses are summarized in a series of tables separated into responses from small (100 or fewer powered vehicles), medium (101-1000 vehicles), and large fleets (>1000 vehicles). The vast majority of fleets do their own brake maintenance, relying primarily on experience and lining manufactures to select aftermarket linings. At least half of the responders are familiar to some extent with TMC Recommended Practice 628 on brake linings, but most do not use this source of test data as the sole criterion to select linings. Significant shortfalls in the applicability of TMC RP 628 to certain types of brake systems were noted.

Blau, P.J.

2003-02-03T23:59:59.000Z

256

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2008  

SciTech Connect (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2008.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2008-10-01T23:59:59.000Z

257

EPAct Requirements and Clean Cities Resources for Fleets (Fact Sheet) (Revised)  

SciTech Connect (OSTI)

This fact sheet explains resources provided by the Clean Cities program to help fleet managers meet EPAct requirements.

Not Available

2011-08-01T23:59:59.000Z

258

EPAct Requirements and Clean Cities Resources for Fleets (Revised) (Fact Sheet)  

SciTech Connect (OSTI)

This fact sheet explains resources provided by the Clean Cities program to help fleet managers meet EPAct requirements.

Not Available

2010-01-01T23:59:59.000Z

259

2010 Ford Fusion-4699 Hybrid BOT Battery Test Results  

Broader source: Energy.gov (indexed) [DOE]

of Motors 1 : 1 Motor Power Rating 2 : 60 kW VIN : 3FADP0L32AR194699 Static Capacity Test Measured Average Capacity: 5.29 Ah Measured Average Energy Capacity: 1,370 Wh Vehicle...

260

Results from a pilot cell test of cermet anodes  

SciTech Connect (OSTI)

Goal was to develop long-lasting, energy-efficient anodes for Hall-Heroult cells used to produce Al metal. The anodes were made from a ceramic/metal composite consisting of NiO and NiFe{sub 2}O{sub 4} and a Cu/Ni metal phase. Thirteen cermet anodes were tested at Reynolds Metals Co., Muscle Shoals, AL. All anodes corroded severely during the pilot test. Electrolyte components were found deep within the anodes. However, there were many deficiencies in the pilot cell test, mainly the failure to maintain optimal operating conditions. It is concluded that there is a variety of fabrication and operational considerations that need to be addressed carefully in any future testing. 118 figs, 16 tabs, 17 refs.(DLC)

Windisch, Jr, C F; Strachan, D M; Henager, Jr, C H; Greenwell, E N [Pacific Northwest Lab., Richland, WA (United States); Alcorn, T R [Reynolds Metals Co., Muscle Shoals, AL (United States). Mfg. Technology Lab.

1992-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Automated Critical Peak Pricing Field Tests: Program Description and Results  

E-Print Network [OSTI]

Energy Information Systems (EIS) and Energy Management andstudy used their existing EIS systems for the Auto-DR test.different types of EMCS and EIS systems, they were “unified”

Piette, Mary Ann; Watson, David; Motegi, Naoya; Kiliccote, Sila; Xu, Peng

2006-01-01T23:59:59.000Z

262

Department of Biological Engineering Fall 2012 Solar Innovations Inc. Biodiesel Fleet Fuel  

E-Print Network [OSTI]

PENNSTATE Department of Biological Engineering Fall 2012 Solar Innovations Inc. Biodiesel Fleet work. The goal was to research and implement biodiesel into their fleet by finding the best biodiesel for the implementation of biodiesel into their fleet. This will include: · Prospective suppliers of biodiesel fuel

Demirel, Melik C.

263

Test result analysis and validation of test verdicts G. v. Bochmann, D. Desbiens, M. Dubuc, D. Ouimet and F. Saba  

E-Print Network [OSTI]

Test result analysis and validation of test verdicts G. v. Bochmann, D. Desbiens, M. Dubuc, D's) are useful in the protocol development cycle, particulary in the conformance testing area. In this paper, we present TETRA, a test and trace analysis tool based on the LOTOS FDT which can be used to automatically

von Bochmann, Gregor

264

The origin of the lost fleet of the mongol empire  

E-Print Network [OSTI]

iii ABSTRACT The Origin of the Lost Fleet of the Mongol Empire. (December 2008) Randall James Sasaki, B.A., Southwest Missouri State University Chair of Advisory Committee: Dr. Louis Filipe M. Vieira de Castro In 1281 C.E., under the rule... ................................................................................................................ xv CHAPTER I INTRODUCTION .......................................................................................... 1 II A BRIEF HISTORY OF EAST ASIA ........................................................... 7 Before the Invasion...

Sasaki, Randall James

2009-05-15T23:59:59.000Z

265

FINAL CONTENT SUBJECT TO CHANGE CONTROLLED HYDROGEN FLEET AND INFRASTRUCTURE  

E-Print Network [OSTI]

a strategy to develop a hydrogen economy that emphasizes co-developing hydrogen infrastructure in parallel in developing a path to a hydrogen economy. The Validation project will seek optimal system solutions to addressDRAFT FINAL CONTENT SUBJECT TO CHANGE CONTROLLED HYDROGEN FLEET AND INFRASTRUCTURE DEMONSTRATION

266

Progress and Challenges for PEM Transit Fleet Applications  

E-Print Network [OSTI]

. #12;· Brief company history in area of fuel cell buses · Current fuel cell bus deployments commercialization of fuel cell buses · Fuel cell bus R&D needs · Future plans Agenda 2 #12;UTC Fleet history · 14+ yr experience integrating fuel cell technology into buses SunLine, AC Transit, LAMTA, Chula Vista 30

267

Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria  

SciTech Connect (OSTI)

This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

2011-08-01T23:59:59.000Z

268

Results of Detailed Hydrologic Characterization Tests - Fiscal Year 2003  

SciTech Connect (OSTI)

This report presents results obtained from detailed hydrologic characterization of the unconfined aquifer system conducted at the Hanford Site.

Spane, Frank A.; Newcomer, Darrell R.

2004-09-13T23:59:59.000Z

269

Design and preliminary test results of Daya Bay RPC modules*  

SciTech Connect (OSTI)

Resistive Plate Chamber (RPC) modules will be used as one part of the cosmic muon veto system in the Daya Bay reactor neutrino experiment. A total of 189 RPC modules will cover the three water pools in the experiment. To achieve track reconstruction and high efficiency, each module consists of 4 layers, each of which contains two sizes of bare chambers. The placement of bare chambers is reversed in different layers to reduce the overlapping dead areas. The module efficiency and patch efficiency were studied both in simulation and test of the data analysis. 143 modules have been constructed and tested. The preliminary study shows that the module and patch 3 out of 4 layers efficiency reaches about 98%.

Hackenburg, R.

2011-09-01T23:59:59.000Z

270

Beta test results for the CAA mini-SAM system  

SciTech Connect (OSTI)

The mission of the Chemical Analysis Automation (CAA) Program is to automate methods for chemical analysis of environmental samples. To accomplish this mission, the CAA team has developed automated laboratory systems based on a plug-and-work strategy for integrating components. Realizing that standardization is the key to implementing this strategy, CAA has developed, demonstrated, and encouraged commercialization of standards for laboratory automation. While the CAA mission is driven by the analyses in support of the extensive remediation programs of the Departments of Energy and Defense, it also impacts any industry that depends upon high volumes of repetitive chemical analysis. A Standard Analysis Method (SAM) is any collection of hardware and software used to automate part or all of a method. The method automated for the Mini-SAM testing is EPA Method 3550, which outlines semivolatiles extraction by sonication. The list of semivolatiles includes the polychlorinated biphenyl (PCB) analytes of interest. The basic building block of a SAM is the Standard Laboratory Module (SLM). For the Mini-SAM test an automated sonication SLM and an automated concentration SLM were configured to perform the extraction and concentration processes. The Mini-SAM differs from the Full-SAM in that a fully automated delivery of materials, samples, and extracts is not required. The intent of the Beta Test of the Mini-SAM was threefold. Firstly, the Mini-SAM Beta Test met a milestone mandated by the Department of Energy in the course of the program effort. Secondly, the CAA Program secured an independent assessment of the equipment and its capabilities from Assagai Analytical Laboratory. Lastly, the Program captured real-world sample data. The independent assessment, coupled with CAA observation of equipment performance, was used to determine strengths and weaknesses of the Mini-SAM and to compile possible modifications for CAA engineers to address.

Johnson, R.C.; Monagle, M.

1997-04-01T23:59:59.000Z

271

The Results of Recent MICE Superconducting Spectrometer Solenoid Test  

SciTech Connect (OSTI)

The MICE spectrometer solenoid magnets will be the first magnets to be installed within the MICE cooling channel. The MICE spectrometer solenoids may be the largest magnets that have been cooled using small two stage coolers. During the previous test of this magnet, the cooler first stage temperatures were too high. The causes of some of the extra first stage heat load has been identified and corrected. The rebuilt magnet had a single stage GM cooler in addition to the three pulse tube coolers. The added cooler reduces the temperature of the top of the HTS leads, the shield and of the first stage of the pulse tube coolers.

Green, Michael A; Virostek, Steve P.; Zisman, Michael S.

2010-10-15T23:59:59.000Z

272

Short-Term Test Results: Multifamily Home Energy Efficiency Retrofit  

SciTech Connect (OSTI)

Multifamily deep energy retrofits (DERs) represent great potential for energy savings, while also providing valuable insights on research-generated efficiency measures, cost-effectiveness metrics, and risk factor strategies for the multifamily housing industry. The Bay Ridge project is comprised of a base scope retrofit with a goal of achieving 30% savings (relative to pre-retrofit), and a DER scope with a goal of 50% savings (relative to pre-retrofit). The base scope has been applied to the entire complex, except for one 12-unit building which underwent the DER scope. Findings from the implementation, commissioning, and short-term testing at Bay Ridge include air infiltration reductions of greater than 60% in the DER building; a hybrid heat pump system with a Savings to Investment Ratio (SIR) > 1 (relative to a high efficiency furnace) which also provides the resident with added incentive for energy savings; and duct leakage reductions of > 60% using an aerosolized duct sealing approach. Despite being a moderate rehab instead of a gut rehab, the Bay Ridge DER is currently projected to achieve energy savings ? 50% compared to pre-retrofit, and the short-term testing supports this estimate.

Lyons, J.

2013-01-01T23:59:59.000Z

273

Hanford 100-D Area Biostimulation Treatability Test Results  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory conducted a treatability test designed to demonstrate that in situ biostimulation can be applied to help meet cleanup goals in the Hanford Site 100-D Area. In situ biostimulation has been extensively researched and applied for aquifer remediation over the last 20 years for various contaminants. In situ biostimulation, in the context of this project, is the process of amending an aquifer with a substrate that induces growth and/or activity of indigenous bacteria for the purpose of inducing a desired reaction. For application at the 100-D Area, the purpose of biostimulation is to induce reduction of chromate, nitrate, and oxygen to remove these compounds from the groundwater. The in situ biostimulation technology is intended to provide supplemental treatment upgradient of the In Situ Redox Manipulation (ISRM) barrier previously installed in the Hanford 100-D Area and thereby increase the longevity of the ISRM barrier. Substrates for the treatability test were selected to provide information about two general approaches for establishing and maintaining an in situ permeable reactive barrier based on biological reactions, i.e., a biobarrier. These approaches included 1) use of a soluble (miscible) substrate that is relatively easy to distribute over a large areal extent, is inexpensive, and is expected to have moderate longevity; and 2) use of an immiscible substrate that can be distributed over a reasonable areal extent at a moderate cost and is expected to have increased longevity.

Truex, Michael J.; Vermeul, Vincent R.; Fritz, Brad G.; Mackley, Rob D.; Mendoza, Donaldo P.; Elmore, Rebecca P.; Mitroshkov, Alexandre V.; Sklarew, Deborah S.; Johnson, Christian D.; Oostrom, Martinus; Newcomer, Darrell R.; Brockman, Fred J.; Bilskis, Christina L.; Hubbard, Susan S.; Peterson, John E.; Williams, Kenneth H.; Gasperikova, E.; Ajo-Franklin, J.

2009-09-30T23:59:59.000Z

274

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the United States Forest Service: Caribou-Targhee National Forest  

SciTech Connect (OSTI)

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for U.S. Department of Energy Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (ITSNA) to collect and evaluate data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization study. The Advanced Vehicle Testing Activity study seeks to collect and evaluate data to validate the utilization of advanced electric drive vehicle transportation. This report focuses on the Caribou-Targhee National Forest (CTNF) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements. ITSNA acknowledges the support of Idaho National Laboratory and CTNF for participation in the study. ITSNA is pleased to provide this report and is encouraged by enthusiasm and support from the Forest Service and CTNF personnel.

Stephen Schey; Jim Francfort; Ian Nienhueser

2014-06-01T23:59:59.000Z

275

CALiPER Round 11 Test Results Webcast  

Broader source: Energy.gov [DOE]

In this February 8, 2011 webcast, Mia Paget of the Pacific Northwest National Laboratory provided the results of each CALiPER round with a "snapshot" of SSL technology status, identifying market...

276

Results of Laboratory Testing of Advanced Power Strips: Preprint  

SciTech Connect (OSTI)

This paper describes the results of a laboratory investigation to evaluate the technical performance of advanced power strip (APS) devices when subjected to a range of home entertainment center and home office usage scenarios.

Earle, L.; Sparn, B.

2012-08-01T23:59:59.000Z

277

Test results, Industrial Solar Technology parabolic trough solar collector  

SciTech Connect (OSTI)

Sandia National Laboratories and Industrial Solar Technology are cost-sharing development of advanced parabolic trough technology. As part of this effort, several configurations of an IST solar collector were tested to determine the collector efficiency and thermal losses with black chrome and black nickel receiver selective coatings, combined with aluminized film and silver film reflectors, using standard Pyrex{reg_sign} and anti-reflective coated Pyrex{reg_sign} glass receiver envelopes. The development effort has been successful, producing an advanced collector with 77% optical efficiency, using silver-film reflectors, a black nickel receiver coating, and a solgel anti-reflective glass receiver envelope. For each receiver configuration, performance equations were empirically derived relating collector efficiency and thermal losses to the operating temperature. Finally, equations were derived showing collector performance as a function of input insolation value, incident angle, and operating temperature.

Dudley, V.E. [EG and G MSI, Albuquerque, NM (United States); Evans, L.R.; Matthews, C.W. [Sandia National Labs., Albuquerque, NM (United States)

1995-11-01T23:59:59.000Z

278

Filtration Understanding: FY10 Testing Results and Filtration Model Update  

SciTech Connect (OSTI)

This document completes the requirements of Milestone 2-4, Final Report of FY10 Testing, discussed in the scope of work outlined in the EM31 task plan WP-2.3.6-2010-1. The focus of task WP 2.3.6 is to improve the U.S. Department of Energy’s (DOE’s) understanding of filtration operations for high-level waste (HLW) to improve filtration and cleaning efficiencies, thereby increasing process throughput and reducing the Na demand (through acid neutralization). Developing the cleaning/backpulsing requirements will produce much more efficient operations for both the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Savannah River Site (SRS), thereby significantly increasing throughput by limiting cleaning cycles. The scope of this work is to develop the understanding of filter fouling to allow developing this cleaning/backpulsing strategy.

Daniel, Richard C.; Billing, Justin M.; Burns, Carolyn A.; Peterson, Reid A.; Russell, Renee L.; Schonewill, Philip P.; Shimskey, Rick W.

2011-04-04T23:59:59.000Z

279

Advanced Test Reactor probabilistic risk assessment methodology and results summary  

SciTech Connect (OSTI)

The Advanced Test Reactor (ATR) probabilistic risk assessment (PRA) Level 1 report documents a comprehensive and state-of-the-art study to establish and reduce the risk associated with operation of the ATR, expressed as a mean frequency of fuel damage. The ATR Level 1 PRA effort is unique and outstanding because of its consistent and state-of-the-art treatment of all facets of the risk study, its comprehensive and cost-effective risk reduction effort while the risk baseline was being established, and its thorough and comprehensive documentation. The PRA includes many improvements to the state-of-the-art, including the following: establishment of a comprehensive generic data base for component failures, treatment of initiating event frequencies given significant plant improvements in recent years, performance of efficient identification and screening of fire and flood events using code-assisted vital area analysis, identification and treatment of significant seismic-fire-flood-wind interactions, and modeling of large loss-of-coolant accidents (LOCAs) and experiment loop ruptures leading to direct damage of the ATR core. 18 refs.

Eide, S.A.; Atkinson, S.A.; Thatcher, T.A.

1992-01-01T23:59:59.000Z

280

DOE Field Operations Program EV and HEV Testing  

SciTech Connect (OSTI)

The United States Department of Energy’s (DOE) Field Operations Program tests advanced technology vehicles (ATVs) and disseminates the testing results to provide fleet managers and other potential ATV users with accurate and unbiased information on vehicle performance. The ATVs (including electric, hybrid, and other alternative fuel vehicles) are tested using one or more methods - Baseline Performance Testing (EVAmerica and Pomona Loop), Accelerated Reliability Testing, and Fleet Testing. The Program (http://ev.inel.gov/sop) and its nine industry testing partners have tested over 30 full-size electric vehicle (EV) models and they have accumulated over 4 million miles of EV testing experience since 1994. In conjunction with several original equipment manufacturers, the Program has developed testing procedures for the new classes of hybrid, urban, and neighborhood EVs. The testing of these vehicles started during 2001. The EVS 18 presentation will include (1) EV and hybrid electric vehicle (HEV) test results, (2) operating experience with and performance trends of various EV and HEV models, and (3) experience with operating hydrogen-fueled vehicles. Data presented for EVs will include vehicle efficiency (km/kWh), average distance driven per charge, and range testing results. The HEV data will include operating considerations, fuel use rates, and range testing results.

Francfort, James Edward; Slezak, L. A.

2001-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Advanced Rooftop Control (ARC) Retrofit: Field-Test Results  

SciTech Connect (OSTI)

The multi-year research study was initiated to find solutions to improve packaged equipment operating efficiency in the field. Pacific Northwest National Laboratory (PNNL), with funding from the U.S. Department of Energy’s (DOE’s) Building Technologies Office (BTO) and Bonneville Power Administration (BPA) conducted this research, development and demonstration (RD&D) study. Packaged equipment with constant speed supply fans is designed to provide ventilation at the design rate at all times when the fan is operating as required by building code. Although there are a number of hours during the day when a building may not be fully occupied or the need for ventilation is lower than designed, the ventilation rate cannot be adjusted easily with a constant speed fan. Therefore, modulating the supply fan in conjunction with demand controlled ventilation (DCV) will not only reduce the coil energy but also reduce the fan energy. The objective of this multi-year research, development and demonstration project was to determine the magnitude of energy savings achievable by retrofitting existing packaged rooftop air conditioners with advanced control strategies not ordinarily used for packaged units. First, through detailed simulation analysis, it was shown that significant energy (between 24% and 35%) and cost savings (38%) from fan, cooling and heating energy consumption could be realized when packaged air conditioning units with gas furnaces are retrofitted with advanced control packages (combining multi-speed fan control, integrated economizer controls and DCV). The simulation analysis also showed significant savings for heat pumps (between 20% and 60%). The simulation analysis was followed by an extensive field test of a retrofittable advanced rooftop unit (RTU) controller.

Wang, Weimin; Katipamula, Srinivas; Ngo, Hung; Underhill, Ronald M.; Taasevigen, Danny J.; Lutes, Robert G.

2013-07-31T23:59:59.000Z

282

Results from tests of TFL Hydragard sampling loop  

SciTech Connect (OSTI)

When the Defense Waste Processing Facility (DWPF) is operational, processed radioactive sludge will be transferred in batches to the Slurry Mix Evaporator (SME), where glass frit will be added and the contents concentrated by boiling. Batches of the slurry mixture are transferred from the SME to the Melter Feed Tank (MFT). Hydragard{reg_sign} sampling systems are used on the SME and the MFT for collecting slurry samples in vials for chemical analysis. An accurate replica of the Hydragard sampling system was built and tested in the thermal Fluids Laboratory (TFL) to determine the hydragard accuracy. It was determined that the original Hydragard valve frequently drew a non-representative sample stream through the sample vial that ranged from frit enriched to frit depleted. The Hydragard valve was modified by moving the plunger and its seat backwards so that the outer surface of the plunger was flush with the inside diameter of the transfer line when the valve was open. The slurry flowing through the vial accurately represented the composition of the slurry in the reservoir for two types of slurries, different dilution factors, a range of transfer flows and a range of vial flows. It was then found that the 15 ml of slurry left in the vial when the Hydragard valve was closed, which is what will be analyzed at DWPF, had a lower ratio of frit to sludge as characterized by the lithium to iron ratio than the slurry flowing through it. The reason for these differences is not understood at this time but it is recommended that additional experimentation be performed with the TFL Hydragard loop to determine the cause.

Steimke, J.L.

1995-03-01T23:59:59.000Z

283

Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook (Book)  

SciTech Connect (OSTI)

A comprehensive Federal Fleet Management Handbook that builds upon the "Guidance for Federal Agencies on E.O. 13514 Section 12-Federal Fleet Management" and provides information to help fleet managers select optimal greenhouse gas and petroleum reduction strategies for each location, meeting or exceeding related fleet requirements, acquiring vehicles to support these strategies while minimizing fleet size and vehicle miles traveled, and refining strategies based on agency performance.

Daley, R.; Ahdieh, N.; Bentley, J.

2014-01-01T23:59:59.000Z

284

Emissions and Fuel Consumption Test Results from a Plug-In Hybrid...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Fuel Consumption Test Results from a Plug-In Hybrid Electric School Bus Emissions and Fuel Consumption Test Results from a Plug-In Hybrid Electric School Bus 2010 DOE Vehicle...

285

Melt coolability modeling and comparison to MACE test results  

SciTech Connect (OSTI)

An important question in the assessment of severe accidents in light water nuclear reactors is the ability of water to quench a molten corium-concrete interaction and thereby terminate the accident progression. As part of the Melt Attack and Coolability Experiment (MACE) Program, phenomenological models of the corium quenching process are under development. The modeling approach considers both bulk cooldown and crust-limited heat transfer regimes, as well as criteria for the pool thermal hydraulic conditions which separate the two regimes. The model is then compared with results of the MACE experiments.

Farmer, M.T.; Sienicki, J.J.; Spencer, B.W.

1992-04-01T23:59:59.000Z

286

Melt coolability modeling and comparison to MACE test results  

SciTech Connect (OSTI)

An important question in the assessment of severe accidents in light water nuclear reactors is the ability of water to quench a molten corium-concrete interaction and thereby terminate the accident progression. As part of the Melt Attack and Coolability Experiment (MACE) Program, phenomenological models of the corium quenching process are under development. The modeling approach considers both bulk cooldown and crust-limited heat transfer regimes, as well as criteria for the pool thermal hydraulic conditions which separate the two regimes. The model is then compared with results of the MACE experiments.

Farmer, M.T.; Sienicki, J.J.; Spencer, B.W.

1992-01-01T23:59:59.000Z

287

To learn more about AT&T Fleet Management Solutions, visit www.att.com/fleet-management or have us contact you.  

E-Print Network [OSTI]

understand how a location-based application can help companies with remote workers, remote assets or fleets that manage a remote workforce or fleet of vehicles face today. To meet those challenges, successful companies.Largeenterprise or small business, manufacturer or plumbing and heating contractor, finding ways to beat the competition

Fisher, Kathleen

288

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

SciTech Connect (OSTI)

General Motors, LLC and energy partner Shell Hydrogen, LLC, deployed a system of hydrogen fuel cell electric vehicles integrated with a hydrogen fueling station infrastructure to operate under real world conditions as part of the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Validation and Demonstration Project. This technical report documents the performance and describes the learnings from progressive generations of vehicle fuel cell system technology and multiple approaches to hydrogen generation and delivery for vehicle fueling.

Stottler, Gary

2012-02-08T23:59:59.000Z

289

Recent Results of the ATLAS Barrel Combined Test Beam  

SciTech Connect (OSTI)

In summer 2004 a full slice of the ATLAS detector -- including all detector subsystems from the inner tracker, the calorimetry to the muon system -- was exposed to particle beams (electrons, pions, photons, muons, protons) with different energies (from 1 GeV to 350 GeV). The aim was to study the combined performance of the different detector subsystems in ATLAS-like conditions.We present the electronics calibration scheme of the electromagnetic calorimeter (EMC) and its complete implementation. The calibrated response of the EMC is compared to the Monte Carlo simulations, showing that a very good description of the data has been achieved. Results of the combined data analysis are presented, focusing on the combined reconstruction of converted photons using the EMC and the ATLAS inner tracker.

Delmastro, Marco [CERN, Geneva (Switzerland); Universita degli Studi, Milan (Italy); INFN, Milan (Italy)

2006-10-27T23:59:59.000Z

290

Field Operations Program Neighborhood Electric Vehicles - Fleet Survey  

SciTech Connect (OSTI)

This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles(NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog- forming emissions annually.

Francfort, James Edward; Carroll, M.

2001-07-01T23:59:59.000Z

291

Field Operations Program - Neighborhood Electric Vehicle Fleet Use  

SciTech Connect (OSTI)

This report summarizes a study of 15 automotive fleets that operate neighborhood electric vehicles (NEVs) in the United States. The information was obtained to help Field Operations Program personnel understand how NEVs are being used, how many miles they are being driven, and if they are being used to replace other types of fleet vehicles or as additions to fleets. (The Field Operations Program is a U.S. Department of Energy Program within the DOE Office of Energy Efficiency and Renewable Energy, Transportation Technologies). The NEVs contribution to petroleum avoidance and cleaner air can be estimated based on the miles driven and by assuming gasoline use and air emissions values for the vehicles being replaced. Gasoline and emissions data for a Honda Civic are used as the Civic has the best fuel use for a gasoline-powered vehicle and very clean emissions. Based on these conservation assumptions, the 348 NEVs are being driven a total of about 1.2 million miles per year. This equates to an average of 3,409 miles per NEV annually or 9 miles per day. It is estimated that 29,195 gallons of petroleum use is avoided annually by the 348 NEVs. This equates to 87 gallons of petroleum use avoided per NEV, per year. Using the 348 NEVs avoids the generation of at least 775 pounds of smog-forming emissions annually.

Francfort, J. E.; Carroll, M. R.

2001-07-02T23:59:59.000Z

292

First interim report of the Federal Fleet Conversion Task Force  

SciTech Connect (OSTI)

The Federal Fleet Conversion Task Force was created by Executive Order 12844, signed by President Clinton on April 21, 1993. In the Order, the President directed that purchases of alternative fueled vehicles by the Federal Government be substantially increased beyond the levels required by current law. The President charged the Task Force with developing recommendations for carrying out the Executive Order, with special emphasis on setting a course that will lead to the widespread use of alternative fueled vehicles by Federal, State, and local government fleets, by private fleets and, ultimately, by individuals. The chief recommendation of the Task Force is the establishment of a Presidential Clean Cities Initiative. To support creation of the Presidential Initiative, the Task Force identified 38 cities and regions, prioritized into three tiers, for concentrating the Initiative`s efforts in Fiscal Years 1994 through 1996. This concentration of effort is key to the effectiveness of the Initiative. The 38 cities and regions would receive priority funding for Federal vehicle purchases and for infrastructure development. In addition, the Task Force has made specific recommendations for overcoming numerous regulatory, economic, and technical barriers that have slowed the introduction of alternative fueled vehicles into general use.

Not Available

1993-08-01T23:59:59.000Z

293

Fuel Cell Vehicle Learning Demonstration: Spring 2008 Results; Preprint  

SciTech Connect (OSTI)

Conference paper presented at the 2008 National Hydrogen Association Meeting that describes the spring, 2008 results of the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

Wipke, K.; Sprik, S.; Kurtz, J.; Garbak, J.

2008-04-01T23:59:59.000Z

294

E-Print Network 3.0 - atlantic wind test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

wind test Search Powered by Explorit Topic List Advanced Search Sample search results for: atlantic wind test Page: << < 1 2 3 4 5 > >> 1 The Potential for Wind Energy in Atlantic...

295

E-Print Network 3.0 - aggregate tests Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sample search results for: aggregate tests Page: << < 1 2 3 4 5 > >> 1 Project Summary Report 7-4977-S 1 The University of Texas at Austin Summary: tests are used to ensure that...

296

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Pre-Solicitation Meeting: Supporting Information  

Broader source: Energy.gov [DOE]

Supporting information and objectives for the pre-solicitation meeting for the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project held March 19, 2003 in Southfield, Michigan.

297

Federal Fleet Files, FEMP, Vol. 2, No. 8 - June 2010 (Fact Sheet)  

SciTech Connect (OSTI)

June 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

Not Available

2010-06-01T23:59:59.000Z

298

Federal Fleet Files, FEMP, Vol. 2, No. 13 - December 2010 (Fact Sheet)  

SciTech Connect (OSTI)

December 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to federal agencies.

Not Available

2010-12-01T23:59:59.000Z

299

Federal Fleet Files, FEMP, Vol. 1, No. 4 - September 2009 (Fact Sheet)  

SciTech Connect (OSTI)

September 2009 issue of the monthly newsletter for the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

Not Available

2009-09-01T23:59:59.000Z

300

Federal Fleet Files, FEMP, Vol. 2, No. 5 - March 2010 (Fact Sheet)  

SciTech Connect (OSTI)

March 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

Not Available

2010-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project Pre-Solicitation Meeting: Questions and Answers  

Broader source: Energy.gov [DOE]

Questions and answers from the pre-solicitation meeting for the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project held March 19, 2003, in Southfield, Michigan.

302

Comments by Julie Crenshaw Van Fleet on DOE/SEA-04, Special Environmen...  

Broader source: Energy.gov (indexed) [DOE]

Julie Crenshaw Van Fleet on DOESEA-04, Special Environmental Analysis: For Actions Taken Under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River...

303

Federal Fleet Files, FEMP, Vol. 1, No. 3 - July 2009 (Fact Sheet)  

SciTech Connect (OSTI)

July 2009 issue of the monthly newsletter for the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

Not Available

2009-07-01T23:59:59.000Z

304

Fuel Cell Buses in U.S. Transit Fleets: Current Status 2012  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Buses in U.S. Transit Fleets: Current Status 2012 Leslie Eudy National Renewable Energy Laboratory Kevin Chandler Battelle Christina Gikakis Federal Transit...

305

Federal Fleet Files, FEMP, Vol. 2, No. 11 - October 2010 (Fact Sheet)  

SciTech Connect (OSTI)

October 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

Not Available

2010-10-01T23:59:59.000Z

306

Federal Fleet Files, FEMP, Vol. 2, No. 12 - November 2010 (Fact Sheet)  

SciTech Connect (OSTI)

November 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

Not Available

2010-11-01T23:59:59.000Z

307

Federal Fleet Files, FEMP, Vol. 2, No. 7 - May 2010 (Fact Sheet)  

SciTech Connect (OSTI)

May 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

Not Available

2010-05-01T23:59:59.000Z

308

Data Management Plan for The Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

Broader source: Energy.gov [DOE]

The Data Management Plan describes how DOE will handle data submitted by recipients as deliverables under the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project.

309

Federal Fleet Files, FEMP, Vol. 2, No. 4 - January 2010 (Fact Sheet)  

SciTech Connect (OSTI)

January 2010 update from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

Not Available

2010-01-01T23:59:59.000Z

310

Federal Fleet Files, FEMP, Vol. 1, No. 1 - May 2009 (Fact Sheet)  

SciTech Connect (OSTI)

Monthly newsletter for the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

Not Available

2009-05-01T23:59:59.000Z

311

Federal Fleet Files, FEMP, Vol. 2, No. 2 - November 2009 (Fact Sheet)  

SciTech Connect (OSTI)

November 2009 issue of monthly news from the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

Not Available

2009-11-01T23:59:59.000Z

312

Test Results From The Idaho National Laboratory 15kW High Temperature Electrolysis Test Facility  

SciTech Connect (OSTI)

A 15kW high temperature electrolysis test facility has been developed at the Idaho National Laboratory under the United States Department of Energy Nuclear Hydrogen Initiative. This facility is intended to study the technology readiness of using high temperature solid oxide cells for large scale nuclear powered hydrogen production. It is designed to address larger-scale issues such as thermal management (feed-stock heating, high temperature gas handling, heat recuperation), multiple-stack hot zone design, multiple-stack electrical configurations, etc. Heat recuperation and hydrogen recycle are incorporated into the design. The facility was operated for 1080 hours and successfully demonstrated the largest scale high temperature solid-oxide-based production of hydrogen to date.

Carl M. Stoots; Keith G. Condie; James E. O'Brien; J. Stephen Herring; Joseph J. Hartvigsen

2009-07-01T23:59:59.000Z

313

Texas Propane Fleet Pilot Program | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy StrainClientDesignOffice -TemplateDavidDepartment ofFleet Pilot

314

Fleet DNA Project Data Summary Report for Bucket Trucks  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityFieldMinds" | National Hansen 1 , M. R.Fleet34 27

315

Fleet DNA Project Data Summary Report for City Transit Buses  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityFieldMinds" | National Hansen 1 , M. R.Fleet34

316

Fleet DNA Project Data Summary Report for Class 8 Tractors  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityFieldMinds" | National Hansen 1 , M. R.Fleet3426 2

317

Fleet DNA Project Data Summary Report for Delivery Trucks  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibilityFieldMinds" | National Hansen 1 , M. R.Fleet3426

318

Alternative Fuels Data Center: Connecticut Utility Fleet Operates Vehicles  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICE OFFuels in Its Fleeton Alternative Fuels

319

Controlled Hydrogen Fleet and Infrastructure Demonstration Project  

SciTech Connect (OSTI)

This program was undertaken in response to the US Department of Energy Solicitation DE-PS30-03GO93010, resulting in this Cooperative Agreement with the Ford Motor Company and BP to demonstrate and evaluate hydrogen fuel cell vehicles and required fueling infrastructure. Ford initially placed 18 hydrogen fuel cell vehicles (FCV) in three geographic regions of the US (Sacramento, CA; Orlando, FL; and southeast Michigan). Subsequently, 8 advanced technology vehicles were developed and evaluated by the Ford engineering team in Michigan. BP is Ford's principal partner and co-applicant on this project and provided the hydrogen infrastructure to support the fuel cell vehicles. BP ultimately provided three new fueling stations. The Ford-BP program consists of two overlapping phases. The deliverables of this project, combined with those of other industry consortia, are to be used to provide critical input to hydrogen economy commercialization decisions by 2015. The program's goal is to support industry efforts of the US President's Hydrogen Fuel Initiative in developing a path to a hydrogen economy. This program was designed to seek complete systems solutions to address hydrogen infrastructure and vehicle development, and possible synergies between hydrogen fuel electricity generation and transportation applications. This project, in support of that national goal, was designed to gain real world experience with Hydrogen powered Fuel Cell Vehicles (H2FCV) 'on the road' used in everyday activities, and further, to begin the development of the required supporting H2 infrastructure. Implementation of a new hydrogen vehicle technology is, as expected, complex because of the need for parallel introduction of a viable, available fuel delivery system and sufficient numbers of vehicles to buy fuel to justify expansion of the fueling infrastructure. Viability of the fuel structure means widespread, affordable hydrogen which can return a reasonable profit to the fuel provider, while viability of the vehicle requires an expected level of cost, comfort, safety and operation, especially driving range, that consumers require. This presents a classic 'chicken and egg' problem, which Ford believes can be solved with thoughtful implementation plans. The eighteen Ford Focus FCV vehicles that were operated for this demonstration project provided the desired real world experience. Some things worked better than expected. Most notable was the robustness and life of the fuel cell. This is thought to be the result of the full hybrid configuration of the drive system where the battery helps to overcome the performance reduction associated with time related fuel cell degradation. In addition, customer satisfaction surveys indicated that people like the cars and the concept and operated them with little hesitation. Although the demonstrated range of the cars was near 200 miles, operators felt constrained because of the lack of a number of conveniently located fueling stations. Overcoming this major concern requires overcoming a key roadblock, fuel storage, in a manner that permits sufficient quantity of fuel without sacrificing passenger or cargo capability. Fueling infrastructure, on the other hand, has been problematic. Only three of a planned seven stations were opened. The difficulty in obtaining public approval and local government support for hydrogen fuel, based largely on the fear of hydrogen that grew from past disasters and atomic weaponry, has inhibited progress and presents a major roadblock to implementation. In addition the cost of hydrogen production, in any of the methodologies used in this program, does not show a rapid reduction to commercially viable rates. On the positive side of this issue was the demonstrated safety of the fueling station, equipment and process. In the Ford program, there were no reported safety incidents.

Dr. Scott Staley

2010-03-31T23:59:59.000Z

320

U.S. Geothermal Announces More Test Results From the Neal Hot...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

a renewable energy company focused on the production of electricity from geothermal energy, announced today results from a second, higher rate flow test of the first full...

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

SciTech Connect: Field Test Results from Lidar Measured Yaw Control...  

Office of Scientific and Technical Information (OSTI)

Conference: Field Test Results from Lidar Measured Yaw Control for Improved Yaw Alignment with the NREL Controls Advanced Research Turbine: Preprint Citation Details In-Document...

322

Text-Alternative Version: CALiPER Round 7 Testing Results and SSL Product Life Issues  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the CALiPER Round 7 Testing Results and SSL Product Life Issues webcast.

323

AVTA: Chrysler RAM Experimental PHEV Pickup Truck Recovery Act Project Testing Results- Phase 2  

Broader source: Energy.gov [DOE]

The following reports describe results of testing done on a 2011 Chrysler RAM PHEV, a demonstration vehicle not currently available for sale.

324

China Energy Efficiency Round Robin Testing Results for Room Air Conditioners  

E-Print Network [OSTI]

Results for Room Air Conditioners Nan Zhou David FridleyTable of Contents I. Air Conditioner Round Robin TestingAir Conditioners..

Zhou, Nan

2010-01-01T23:59:59.000Z

325

Multipacting simulation and test results of BNL 704 MHz SRF gun  

SciTech Connect (OSTI)

The BNL 704MHz SRF gun has a grooved choke joint to support the photo-cathode. Due to the distortion of grooves at the choke joint during the BCP for the choke joint, several multipacting barriers showed up when it was tested with Nb cathode stalk at JLab. We built a setup to use the spare large grain SRF cavity to test and condition the multipacting at BNL with various power sources up to 50kW. The test is carried out in three stages: testing the cavity performance without cathode, testing the cavity with the Nb cathode stalk that was used at Jlab, and testing the cavity with a copper cathode stalk that is based on the design for the SRF gun. This paper summarizes the results of multipacting simulation, and presents the large grain cavity test setup and the test results.

Xu W.; Belomestnykh, S.; Ben-Zvi, I.; Cullen, C. et al

2012-05-20T23:59:59.000Z

326

Home energy rating system building energy simulation test (HERS BESTEST). Volume 2, Tier 1 and Tier 2 tests reference results  

SciTech Connect (OSTI)

The Home Energy Rating System (HERS) Building Energy Simulation Test (BESTEST) is a method for evaluating the credibility of software used by HERS to model energy use in buildings. The method provides the technical foundation for ''certification of the technical accuracy of building energy analysis tools used to determine energy efficiency ratings,'' as called for in the Energy Policy Act of 1992 (Title I, Subtitle A, Section 102, Title II, Part 6, Section 271). Certification is accomplished with a uniform set of test cases that Facilitate the comparison of a software tool with several of the best public-domain, state-of-the-art building energy simulation programs available in the United States. The HERS BESTEST work is divided into two volumes. Volume 1 contains the test case specifications and is a user's manual for anyone wishing to test a computer program. Volume 2 contains the reference results and suggestions for accrediting agencies on how to use and interpret the results.

Judkoff, R.; Neymark, J.

1995-11-01T23:59:59.000Z

327

AVTA: Chrysler RAM Experimental PHEV Pickup Truck Recovery Act Project Testing Results Phase 1  

Broader source: Energy.gov [DOE]

The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The American Recovery and Reinvestment Act supported a number of projects that together made up the largest ever deployment of plug-in electric vehicles and charging infrastructure in the U.S. The following reports describe results of testing done on a 2011 Chrysler RAM PHEV, a demonstration vehicle not currently available for sale. The baseline performance testing provides a point of comparison for the other test results. Taken together, these reports give an overall view of how this vehicle functions under extensive testing. This research was conducted by Idaho National Laboratory.

328

Hydrogen ICE Vehicle Testing Activities  

SciTech Connect (OSTI)

The Advanced Vehicle Testing Activity teamed with Electric Transportation Applications and Arizona Public Service to develop and monitor the operations of the APS Alternative Fuel (Hydrogen) Pilot Plant. The Pilot Plant provides 100% hydrogen, and hydrogen and compressed natural gas (H/CNG)-blended fuels for the evaluation of hydrogen and H/CNG internal combustion engine (ICE) vehicles in controlled and fleet testing environments. Since June 2002, twenty hydrogen and H/CNG vehicles have accumulated 300,000 test miles and 5,700 fueling events. The AVTA is part of the Department of Energy’s FreedomCAR and Vehicle Technologies Program. These testing activities are managed by the Idaho National Laboratory. This paper discusses the Pilot Plant design and monitoring, and hydrogen ICE vehicle testing methods and results.

J. Francfort; D. Karner

2006-04-01T23:59:59.000Z

329

Nuclear power fleets and uranium resources recovered from phosphates  

SciTech Connect (OSTI)

Current light water reactors (LWR) burn fissile uranium, whereas some future reactors, as Sodium fast reactors (SFR) will be capable of recycling their own plutonium and already-extracted depleted uranium. This makes them a feasible solution for the sustainable development of nuclear energy. Nonetheless, a sufficient quantity of plutonium is needed to start up an SFR, with the plutonium already being produced in light water reactors. The availability of natural uranium therefore has a direct impact on the capacity of the reactors (both LWR and SFR) that we can build. It is therefore important to have an accurate estimate of the available uranium resources in order to plan for the world's future nuclear reactor fleet. This paper discusses the correspondence between the resources (uranium and plutonium) and the nuclear power demand. Sodium fast reactors will be built in line with the availability of plutonium, including fast breeders when necessary. Different assumptions on the global uranium resources are taken into consideration. The largely quoted estimate of 22 Mt of uranium recovered for phosphate rocks can be seriously downscaled. Based on our current knowledge of phosphate resources, 4 Mt of recoverable uranium already seems to be an upper bound value. The impact of the downscaled estimate on the deployment of a nuclear fleet is assessed accordingly. (authors)

Gabriel, S.; Baschwitz, A.; Mathonniere, G. [CEA, DEN/DANS/I-tese, F-91191 Gif-sur-Yvette (France)

2013-07-01T23:59:59.000Z

330

United States navy fleet problems and the development of carrier aviation, 1929-1933  

E-Print Network [OSTI]

valuable platform to explore the potential uses of carrier aviation, but was usually limited to scouting and fleet air defense in the U.S. Navy??s annual interwar exercises called fleet problems. This began to change in 1929 with the introduction...

Wadle, Ryan David

2005-11-01T23:59:59.000Z

331

OPERATING A FLEET OF ELECTRIC TAXIS BERNAT GACIAS AND FREDERIC MEUNIER  

E-Print Network [OSTI]

of electric taxi fleets is highly desirable from a sustainable point of view. Nevertheless, the weak autonomy of such fleets finds is main motivation in sustainable issues: electric vehicles release almost no air pollutants. However, the main drawback of an electric vehicle is its weak autonomy ­ 80 km in the case of the Centrale

Boyer, Edmond

332

Introduction to the U.S. Department of Energy's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

SciTech Connect (OSTI)

Early in 2003, the U.S. Department of Energy (DOE) initiated the ''Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project'' solicitation. The purpose of this project is to examine the impact and performance of fuel cell vehicles and the requisite hydrogen infrastructure in real-world applications. The integrated nature of the project enables DOE to work with industry to test, demonstrate, and validate optimal system solutions. Information learned from the vehicles and infrastructure will be fed back into DOE's R&D program to guide and refocus future research as needed, making this project truly a ''learning demonstration''.

Wipke, K.; Welch, C.; Gronich, S.; Garbak, J.; Hooker, D.

2006-05-01T23:59:59.000Z

333

Water Loss Test Results for the West Main Pipeline United Irrigation District of Hidalgo County  

E-Print Network [OSTI]

TR-322 2008 Water Loss Test Results for the West Main Pipeline United Irrigation District of Hidalgo County Eric Leigh Texas AgriLife Extension Associate, Biological and Agricultural Engineering, College... Station Guy Fipps Texas AgriLife Extension Professor and Extension Agricultural Engineer, Biological and Agricultural Engineering, College Station March 20, 2007 Water Loss Test Results for the West Main Pipeline United Irrigation...

Leigh, E.; Fipps, G.

334

Seepage Test Loss Results The Main Canal Valley Municipal Utility District No. 2  

E-Print Network [OSTI]

TR-326 2008 Seepage Test Loss Results The Main Canal Valley Municipal Utility District No. 2 Eric Leigh Texas AgriLife Extension Associate, Biological and Agricultural Engineering, College Station Guy... Fipps Texas AgriLife Extension Professor and Extension Agricultural Engineer, Biological and Agricultural Engineering, College Station January 21, 2004 SEEPAGE LOSS TEST RESULTS THE MAIN CANAL VALLEY MUNICIPAL UTILITY DISTRICT...

Leigh, E.; Fipps, G.

335

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Fall 2009; Composite Data Products, Final Version September 11, 2009  

SciTech Connect (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through September 2009.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2009-09-01T23:59:59.000Z

336

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project: Spring 2010; Composite Data Products, Final Version March 29, 2010  

SciTech Connect (OSTI)

Graphs of composite data products produced by DOE's Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation project through March 2010.

Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.

2010-05-01T23:59:59.000Z

337

Field Lysimeter Investigations - test results: Low-Level Waste Data Base Development Program: Test results for fiscal years 1994-1995  

SciTech Connect (OSTI)

The Field Lysimeter Investigations: Low-Level Waste Data Base Development Program, funded by the U.S. Nuclear Regulatory Commission (NRC), is (1) studying the degradation effects in EPICOR-II organic ion-exchange resins caused by radiation, (2) examining the adequacy of test procedures recommended in the Branch Technical Position on Waste Form to meet the requirements of 10 CFR 61 using solidified EPICOR-II resins, (3) obtaining performance information on solidified EPICOR-II ion-exchange resins in a disposal environment, and (4) determining the condition of EPICOR-II liners. Results of the final 2 (10 total) years of data acquisition from operation of the field testing are presented and discussed. During the continuing field testing, both portland type I-II cement and Dow vinyl ester-styrene waste forms are being tested in lysimeter arrays located at Argonne National Laboratory-East in Illinois and at Oak Ridge National Laboratory. The experimental equipment is described and results of waste form characterization using tests recommended by the NRC`s {open_quotes}Technical Position on Waste Form{close_quotes} are presented. The study is designed to provide continuous data on nuclide release and movement, as well as environmental conditions, over a 20-year period. At the end of the tenth year, the experiment was closed down. Examination of soil and waste forms is planned to be conducted next and will be reported later.

McConnell, J.W. Jr.; Rodgers, R.D.; Hilton, L.D.; Neilson, R.M. Jr. [and others

1996-06-01T23:59:59.000Z

338

Field lysimeter investigations - test results. Low-level waste data base development program: Test results for fiscal years 1986, 1987, 1988, and 1989  

SciTech Connect (OSTI)

The Field Lysimeter Investigations: Low-Level Waste Data Base Development Program, funded by the U.S. Nuclear Regulatory Commission (NRC), is (a) studying the degradation effects in EPICOR-II organic ion-exchange resins caused by radiation, (b) examining the adequacy of test procedures recommended in the Branch Technical Position on Waste Form to meet the requirements of 10 CFR 61 using solidified EPICOR-II resins, (c) obtaining performance information on solidified EPICOR-II ion-exchange resins in a disposal environment, and (d) determining the condition of EPICOR-II liners. Results of the first 4 years of data acquisition from the field testing are presented and discussed. During the continuing field testing, both Portland type I-II cement and Dow vinyl ester-styrene waste forms are being tested in lysimeter arrays located at Argonne National Laboratory-East in Illinois and at Oak Ridge National Laboratory. The experimental equipment is described and results of waste form characterization using tests recommended by the NRC`s {open_quotes}Technical Position on Waste Form{close_quotes} are presented. The study is designed to provide continuous data on nuclide release and movement, as well as environmental conditions, over a 20-year period.

McConnell, J.W. Jr.; Rogers, R.D.; Findlay, M.W.; Davis, E.C.; Jastrow, J.D.; Neilson, R.M. Jr.; Hilton, L.D.

1995-05-01T23:59:59.000Z

339

Field Lysimeter Investigations -- Test results. Low-Level Waste Data Base Development Program: Test results for fiscal years 1990, 1991, 1992, and 1993; Volume 2  

SciTech Connect (OSTI)

The Field Lysimeter Investigations: Low-Level Waste Data Base Development Program, funded by the US Nuclear Regulatory Commission (NRC), is (a) studying the degradation effects in EPICOR-II organic ion-exchange resins caused by radiation, (b) examining the adequacy of test procedures recommended in the Branch Technical Position on Waste Form to meet the requirements of 10 CFR 61 using solidified EPICOR-II resins, (c) obtaining performance information on solidified EPICOR-II ion-exchange resins in a disposal environment, and (d) determining the condition of EPICOR-II liners. Results of the second 4 years of data acquisition from the field testing are presented and discussed. During the continuing field testing, both portland type 1--2 cement and Dow vinyl ester-styrene waste forms are being tested in lysimeter arrays located at Argonne National Laboratory-East in Illinois and at Oak Ridge National Laboratory. The experimental equipment is described and results of waste form characterization using tests recommended by the NRC`s ``Technical Position on Waste Form`` are presented. The study is designed to provide continuous data on nuclide release and movement, as well as environmental conditions, over a 20-year period.

McConnell, J.W. Jr.; Rogers, R.D.; Brey, R.R.; Neilson, R.M. Jr.; Hilton, L.D. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering Lab.; Jastrow, J.D. [Argonne National Lab., IL (United States); Wickliff Hicks, D.S.; Sanford, W.E. [Oak Ridge National Lab., TN (United States); Sullivan, T.M. [Brookhaven National Lab., Upton, NY (United States)

1995-12-01T23:59:59.000Z

340

Hybrid Electric and Plug-in Hybrid Electric Vehicle Testing Activities  

SciTech Connect (OSTI)

The Advanced Vehicle Testing Activity (AVTA) conducts hybrid electric vehicle (HEV) and plug-in hybrid electric vehicle (PHEV) testing in order to provide benchmark data for technology modeling and research and development programs, and to be an independent source of test data for fleet managers and other early adaptors of advanced-technology vehicles. To date, the AVTA has completed baseline performance testing on 12 HEV models and accumulated 2.7 million fleet testing miles on 35 HEVs. The HEV baseline performance testing includes dynamometer and closed-track testing to document HEV performance in a controlled environment. During fleet testing, two of each HEV model accumulate 160,000 test miles within 36 months, during which maintenance and repair events and fuel use were recorded. Three models of PHEVs, from vehicle converters Energy CS and Hymotion and the original equipment manufacturer Renault, are currently in testing. The PHEV baseline performance testing includes 5 days of dynamometer testing with a minimum of 26 test drive cycles, including the Urban Dynamometer Driving Schedule, the Highway Fuel Economy Driving Schedule, and the US06 test cycle, in charge-depleting and charge-sustaining modes. The PHEV accelerated testing is conducted with dedicated drivers for 4,240 miles, over a series of 132 driving loops that range from 10 to 200 miles over various combinations of defined 10-mile urban and 10-mile highway loops, with 984 hours of vehicle charging. The AVTA is part of the U.S. Department of Energy’s FreedomCAR and Vehicle Technologies Program. These AVTA testing activities were conducted by the Idaho National Laboratory and Electric Transportation Applications, with dynamometer testing conducted at Argonne National Laboratory. This paper discusses the testing methods and results.

Donald Karner

2007-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Laboratory and field corrosion test results on aluminum-transition-steel systems on automobiles  

SciTech Connect (OSTI)

Use of steel clad aluminum transition material to join aluminum body panels and structural members to steel is demonstrated. The transition material allows joining of aluminum and steel by conventional techniques such as spot welding and eliminates galvanic corrosion at the joints. Corrosion test results for a wide range of aluminum-transition-steel systems in laboratory tests, atmospheric exposure, and field test plates are presented. The break strength of joints containing two, three, or four members was used as a measure of performance after corrosion testing. Statistical analysis of the results showed that the transition material prevented degradation of the mechanical properties of the joints.

Haynes, G.; Baboian, R. [Texas Instruments Inc., Attleboro, MA (United States). Electrochemical and Corrosion Lab.

1995-11-01T23:59:59.000Z

342

Test results on the Frenchman's Reef Solar Data Acquisition and Control System  

SciTech Connect (OSTI)

The test procedures and the results obtained are described from an evaluation test program conducted on the Frenchman's Reef Data Acquisition and Control System (DACS), Sunlogger Model 10000-1, produced by Andover Controls Corporation. The purpose of the test program was to verify the accuracy of control functions and to determine the performance of the system in the environment of the planned installation site.

Not Available

1980-01-15T23:59:59.000Z

343

Results from dynamic tests and analyses of a medium diameter LMFBR piping system  

SciTech Connect (OSTI)

This paper presents results and observations from dynamic tests and analyses performed on a 0.20 m (8 in.) diameter, thin walled piping system. The piping system is a scaled representation of a Liquid Metal Fast Breeder Reactor (LMFBR) large diameter piping loop. Prototypic piping restraints were employed, including mechanical snubbers, rigid struts, pipe hangers and non-integral pipe clamps. Snapback, sine-sweep and seismic tests were performed for various restraint configurations and piping conditions. The test results are compared to analytical predictions for verification of the methods and models used in the seismic design of LMFBR piping systems. Test program conclusions and general recommendations for piping seismic analyses are presented along with a discussion of test and analysis results.

Schott, G.A.; Heberling, C.F.; Hulbert, G.M.

1984-06-01T23:59:59.000Z

344

Results from dynamic tests and analyses of a medium diameter LMFBR piping system  

SciTech Connect (OSTI)

This paper presents results and observations from dynamic tests and analyses performed on an 8-in. (0.20-m) diameter, thin-walled piping system. The piping system is a scaled representation of a Liquid Metal Fast Breeder Reactor (LMFBR) large diameter piping loop. Prototypic piping restraints were employed, including mechanical snubbers, rigid struts, pipe hangers and nonintegral pipe clamps. Snapback, sine-sweep and seismic tests were performed for various restraint configurations and piping conditions. The test results are compared to analytical predictions for verification of the methods and models used in the seismic design of LMFBR piping systems. Test program conclusions and general recommendations for piping seismic analyses are presented along with a discussion of test and analysis results.

Schott, G.A.; Hulbert, G.M.; Heberling, C.F. II

1986-08-01T23:59:59.000Z

345

CALiPER Round 7 Testing Results and SSL Product Life Issues  

Broader source: Energy.gov [DOE]

This April 9, 2009 webcast provided an overview of CALiPER's Round 7 testing results, and an update on the emerging understanding of service life and long-term reliability for solid-state lighting...

346

Results of Electric Survey in the Area of Hawaii Geothermal Test...  

Open Energy Info (EERE)

of Electric Survey in the Area of Hawaii Geothermal Test Well HGP-A Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Results of Electric Survey...

347

Results of the Flowmeter-Injection Test in the Long Valley Exploratory...  

Open Energy Info (EERE)

Results of the Flowmeter-Injection Test in the Long Valley Exploratory Well (Phase II), Long Valley, California Jump to: navigation, search OpenEI Reference LibraryAdd to library...

348

U.S. Geothermal Announces More Test Results from the Neal Hot...  

Open Energy Info (EERE)

Announces More Test Results from the Neal Hot Springs Production Well and a Key Addition to Senior Staff Jump to: navigation, search OpenEI Reference LibraryAdd to library Report:...

349

AVTA: Testing Results on the USPS Long-life Vehicle Conversions...  

Energy Savers [EERE]

and development. The following reports describe results of testing conversions to all-electric vehicles of the U.S. Postal Service's standard Long-Life Vehicle used for postal...

350

2D-Modelling of pellet injection in the poloidal plane: results of numerical tests  

E-Print Network [OSTI]

2D-Modelling of pellet injection in the poloidal plane: results of numerical tests P. Lalousis developed for computing the expansion of pellet-produced clouds in the poloidal plane. The expansion

Paris-Sud XI, Université de

351

E-Print Network 3.0 - advanced test manage Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

manage Search Powered by Explorit Topic List Advanced Search Sample search results for: advanced test manage Page: << < 1 2 3 4 5 > >> 1 Current Strategies for Bovine TB Control...

352

Testing theoretical game theory results on a large scale : prisoner's dilemma on Facebook  

E-Print Network [OSTI]

In my research, I designed and implemented an online game accessable to a large diverse audience via the Facebook social network to test out game theoretic results and study social interactions. In this game, we designed ...

Long, Sunny (Sunny X.)

2013-01-01T23:59:59.000Z

353

E-Print Network 3.0 - allelic sums test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by Explorit Topic List Advanced Search Sample search results for: allelic sums test Page: << < 1 2 3 4 5 > >> 1 Plant Molecular Biology 42: 169179, 2000. 2000 Kluwer Academic...

354

Aluminum filtering preheater test results. Topical report, January-September 1994  

SciTech Connect (OSTI)

A prototype hood for preheating filters and refractory bowls used in the filtration of primary molten aluminum was tested under laboratory and plant conditions. The hood utilized gas fired, reticulated ceramic infrared burners as the heat source. The testing showed improved temperature uniformity and priming rates over conventional technology. A field test unit was designed and fabricated based on the prototype results. The unit was tested at the Alcoa Lafayette Plant in Lafayette, Indiana for a two month period. The unit performed reliably and improved preheating conditions were achieved. However, the lack of portability of the unit proved to be a problem for the operators.

Sweeting, T.B.; Gillish, K.

1995-04-01T23:59:59.000Z

355

CoalFleet RD&D augmentation plan for integrated gasification combined cycle (IGCC) power plants  

SciTech Connect (OSTI)

To help accelerate the development, demonstration, and market introduction of integrated gasification combined cycle (IGCC) and other clean coal technologies, EPRI formed the CoalFleet for Tomorrow initiative, which facilitates collaborative research by more than 50 organizations from around the world representing power generators, equipment suppliers and engineering design and construction firms, the U.S. Department of Energy, and others. This group advised EPRI as it evaluated more than 120 coal-gasification-related research projects worldwide to identify gaps or critical-path activities where additional resources and expertise could hasten the market introduction of IGCC advances. The resulting 'IGCC RD&D Augmentation Plan' describes such opportunities and how they could be addressed, for both IGCC plants to be built in the near term (by 2012-15) and over the longer term (2015-25), when demand for new electric generating capacity is expected to soar. For the near term, EPRI recommends 19 projects that could reduce the levelized cost-of-electricity for IGCC to the level of today's conventional pulverized-coal power plants with supercritical steam conditions and state-of-the-art environmental controls. For the long term, EPRI's recommended projects could reduce the levelized cost of an IGCC plant capturing 90% of the CO{sub 2} produced from the carbon in coal (for safe storage away from the atmosphere) to the level of today's IGCC plants without CO{sub 2} capture. EPRI's CoalFleet for Tomorrow program is also preparing a companion RD&D augmentation plan for advanced-combustion-based (i.e., non-gasification) clean coal technologies (Report 1013221). 7 refs., 30 figs., 29 tabs., 4 apps.

NONE

2007-01-15T23:59:59.000Z

356

Results and implications of the EBR-II inherent safety demonstration tests  

SciTech Connect (OSTI)

On April 3, 1986 two milestone tests were conducted in Experimental Breeder Reactor-2 (EBR-II). The first test was a loss of flow without scram and the second was a loss of heat sink without scram. Both tests were initiated from 100% power and in both tests the reactor was shut down by natural processes, principally thermal expansion, without automatic scram, operator intervention or the help of special in-core devices. The temperature transients during the tests were mild, as predicted, and there was no damage to the core or reactor plant structures. In a general sense, therefore, the tests plus supporting analysis demonstrated the feasibility of inherent passive shutdown for undercooling accidents in metal-fueled LMRs. The results provide a technical basis for future experiments in EBR-II to demonstrate inherent safety for overpower accidents and provide data for validation of computer codes used for design and safety analysis of inherently safe reactor plants.

Planchon, H.P.; Golden, G.H.; Sackett, J.I.; Mohr, D.; Chang, L.K.; Feldman, E.E.; Betten, P.R.

1987-01-01T23:59:59.000Z

357

Comparison of particle simulation with j-parc linac mebt beam test results  

SciTech Connect (OSTI)

The construction of the initial part of the J-PARC linac has been started at KEK for beam tests before moving to the JAERI Tokai campus, where J-PARC facility is finally to be constructed. The RFQ and MEBT (Medium Energy Beam Transport) has already been installed at KEK, and the beam test has been performed successfully. In this paper, the experimental results of the beam test are compared with simulation results with a 3D PIC (Particle-In-Cell) code, IMPACT.

Ikegami, M.; Kato, T., Igarashi, Z.; Ueno, A.; Kondo, Y.; Ryne, R.; Qiang, J.

2003-12-16T23:59:59.000Z

358

Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook, June 2010, Federal Energy Management Program (FEMP)  

SciTech Connect (OSTI)

Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

Not Available

2010-06-01T23:59:59.000Z

359

Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook, July 2011, Federal Energy Management Program (FEMP)  

SciTech Connect (OSTI)

Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

Not Available

2011-07-01T23:59:59.000Z

360

Solar powered hydrogen generating facility and hydrogen powered vehicle fleet. Final technical report, August 11, 1994--January 6, 1997  

SciTech Connect (OSTI)

This final report describes activities carried out in support of a demonstration of a hydrogen powered vehicle fleet and construction of a solar powered hydrogen generation system. The hydrogen generation system was permitted for construction, constructed, and permitted for operation. It is not connected to the utility grid, either for electrolytic generation of hydrogen or for compression of the gas. Operation results from ideal and cloudy days are presented. The report also describes the achievement of licensing permits for their hydrogen powered trucks in California, safety assessments of the trucks, performance data, and information on emissions measurements which demonstrate performance better than the Ultra-Low Emission Vehicle levels.

Provenzano, J.J.

1997-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Testing for fault activity at Yucca Mountain, Nevada, using independent GPS results from the BARGEN network  

E-Print Network [OSTI]

Testing for fault activity at Yucca Mountain, Nevada, using independent GPS results from the BARGEN June 2006; published 19 July 2006. [1] Data from BARGEN GPS stations around Yucca Mountain (YM) have at Yucca Mountain, Nevada, using independent GPS results from the BARGEN network, Geophys. Res. Lett., 33

Blewitt, Geoffrey

362

Deep Vadose Zone Treatability Test for the Hanford Central Plateau: Interim Post-Desiccation Monitoring Results  

SciTech Connect (OSTI)

A field test of desiccation is being conducted as an element of the deep vadose zone treatability test program. Desiccation technology relies on removal of water from a portion of the subsurface such that the resultant low moisture conditions inhibit downward movement of water and dissolved contaminants. Previously, a field test report (Truex et al. 2012a) was prepared describing the active desiccation portion of the test and initial post-desiccation monitoring data. Additional monitoring data have been collected at the field test site during the post-desiccation period and is reported herein along with interpretation with respect to desiccation performance. This is an interim report including about 2 years of post-desiccation monitoring data.

Truex, Michael J.; Oostrom, Martinus; Strickland, Christopher E.; Johnson, Timothy C.; Johnson, Christian D.; Clayton, Ray E.; Chronister, Glen B.

2013-09-01T23:59:59.000Z

363

Documentation of toxicity testing results on increased supernate treatment rate of 2700 gallons/batch  

SciTech Connect (OSTI)

In February 1991, Reactor Materials increased the rate of supernate treatment in the M-Area Dilute Effluent Treatment Facility (DETF) from 1800 gallons to [approximately]2700 gallons of supernate per 36,000 gallon dilute wastewater batch. The first release of the treated effluent began on March 3, 1991. A series of whole effluent toxicity tests was conducted on the DETF effluent to determine if the increased supernate concentration would result in any chronic toxicity affects in the receiving stream (Tims Branch). The toxicity tests were conducted at instream concentrations equivalent to DETF release rates of 5, 10, 15, 20, and 25 gallons/min. The test results, based on 7-day Ceriodaphnia dubia chronic toxicity, indicated no toxicity effects at any concentration tested. Supernate treatment in DETF continued at the higher concentration.

Pickett, J.B.

1992-07-06T23:59:59.000Z

364

Gearbox Reliability Collaborative Phase 1 and 2: Testing and Modeling Results; Preprint  

SciTech Connect (OSTI)

The Gearbox Reliability Collaborative (GRC) investigates root causes of wind turbine gearbox premature failures and validates design assumptions that affect gearbox reliability using a combined testing and modeling approach. Knowledge gained from the testing and modeling of the GRC gearboxes builds an understanding of how the selected loads and events translate into internal responses of three-point mounted gearboxes. This paper presents some testing and modeling results of the GRC research during Phase 1 and 2. Non-torque loads from the rotor including shaft bending and thrust, traditionally assumed to be uncoupled with gearbox, affect gear and bearing loads and resulting gearbox responses. Bearing clearance increases bearing loads and causes cyclic loading, which could contribute to a reduced bearing life. Including flexibilities of key drivetrain subcomponents is important in order to reproduce the measured gearbox response during the tests using modeling approaches.

Keller, J.; Guo, Y.; LaCava, W.; Link, H.; McNiff, B.

2012-05-01T23:59:59.000Z

365

Small-Scale Water Ingression and Crust Strength Tests (SSWICS) SSWICS-6 test data report : thermal hydraulic results, Rev. 0.  

SciTech Connect (OSTI)

The Melt Attack and Coolability Experiments (MACE) program at Argonne National Laboratory addressed the issue of the ability of water to cool and thermally stabilize a molten core/concrete interaction (MCCI) when the reactants are flooded from above. These tests provided data regarding the nature of corium interactions with concrete, the heat transfer rates from the melt to the overlying water pool, and the role of noncondensable gases in the mixing processes that contribute to melt quenching. However, due to the integral nature of these tests, several questions regarding the crust freezing behavior could not be adequately resolved. These questions include: (1) To what extent does water ingression into the crust increase the melt quench rate above the conduction-limited rate and how is this affected by melt composition and system pressure? (2) What is the fracture strength of the corium crust when subjected to a thermal-mechanical load and how does it depend upon the melt composition? A series of separate-effects experiments are being conducted to address these issues. The first employs an apparatus designed to measure the quench rate of a pool of corium ({approx} {phi} 30 cm; up to 20 cm deep). The main parameter to be varied in these quench tests is the melt composition since it is thought to have a critical influence on the crust cracking behavior which, in turn, alters quench rate. The issue of crust strength is being addressed with a second apparatus designed to mechanically load the crust produced by the quench tests. This apparatus measures the fracture strength of the crust while it is either at room temperature or above, the latter state being achieved with a heating element placed below the crust. The two apparatuses used to measure the melt quench rate and crust strength are jointly referred to as SSWICS (Small-Scale Water Ingression and Crust Strength). This report describes results of the sixth water ingression test, designated SSWICS-6. This test investigated the quenching behavior of a fully oxidized PWR corium melt containing 15 wt% siliceous concrete at a system pressure of 1 bar absolute. The report includes a description of the test apparatus, the instrumentation used, plots of the recorded data, and some rudimentary data reduction to obtain an estimate of the heat flux from the corium to the overlying water pool.

Lomperski, S.; Farmer, M. T.; Kilsdonk, D.; Aeschlimann, B. (Nuclear Engineering Division)

2011-06-28T23:59:59.000Z

366

List of Attendees at the Controlled Hydrogen Fleet and Infrastructure Demonstation and Pre-Solicitation Meeting  

Broader source: Energy.gov [DOE]

This list of attendees represents those that attended the Controlled Hydrogen Fleet and Infrastructure Demonstation and Pre-Solicitation Meeting pre-solicitation meeting in Detroit, Michigan, on March 19, 2003.

367

Pre-solicitation Meeting for the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project  

Broader source: Energy.gov [DOE]

This presentation was given to attendees of the Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project pre-solicitation meeting held in Detroit, Michigan, on March 19, 2003.

368

Evaluation of coal-derived liquids as boiler fuels. Volume 3. Emissions test results. Final report  

SciTech Connect (OSTI)

A combustion demonstration using six coal-derived fuels was conducted on a utility boiler located at the plant, Sweatt Electric Generating Station of Mississippi Power Company, in Meridian, Mississippi. Volume 1, of a 5 volume report, contains a comprehensive report of the whole test program - see abstract of Volume 1 for a detailed abstract of the whole program. Volume 3 contains detailed emissions testing results. 41 figs., 6 tabs. (LTN)

Not Available

1985-09-01T23:59:59.000Z

369

E-Print Network 3.0 - aptitude tests Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ability tests (sometimes called aptitude tests) which test an individual... as for career counselling and self development purposes. APTITUDE OR ABILITY TESTS These tests are...

370

Scaling Relationships Based on Scaled Tank Mixing and Transfer Test Results  

SciTech Connect (OSTI)

This report documents the statistical analyses performed (by Pacific Northwest National Laboratory for Washington River Protection Solutions) on data from 26 tests conducted using two scaled tanks (43 and 120 inches) in the Small Scale Mixing Demonstration platform. The 26 tests varied several test parameters, including mixer-jet nozzle velocity, base simulant, supernatant viscosity, and capture velocity. For each test, samples were taken pre-transfer and during five batch transfers. The samples were analyzed for the concentrations (lbs/gal slurry) of four primary components in the base simulants (gibbsite, stainless steel, sand, and ZrO2). The statistical analyses including modeling the component concentrations as functions of test parameters using stepwise regression with two different model forms. The resulting models were used in an equivalent performance approach to calculate values of scaling exponents (for a simple geometric scaling relationship) as functions of the parameters in the component concentration models. The resulting models and scaling exponents are displayed in tables and graphically. The sensitivities of component concentrations and scaling exponents to the test parameters are presented graphically. These results will serve as inputs to subsequent work by other researchers to develop scaling relationships that are applicable to full-scale tanks.

Piepel, Gregory F.; Holmes, Aimee E.; Heredia-Langner, Alejandro

2013-09-18T23:59:59.000Z

371

Scaling Relationships Based on Scaled Tank Mixing and Transfer Test Results  

SciTech Connect (OSTI)

This report documents the statistical analyses performed (by Pacific Northwest National Laboratory for Washington River Protection Solutions) on data from 26 tests conducted using two scaled tanks (43 and 120 inches) in the Small Scale Mixing Demonstration platform. The 26 tests varied several test parameters, including mixer-jet nozzle velocity, base simulant, supernatant viscosity, and capture velocity. For each test, samples were taken pre-transfer and during five batch transfers. The samples were analyzed for the concentrations (lbs/gal slurry) of four primary components in the base simulants (gibbsite, stainless steel, sand, and ZrO2). The statistical analyses including modeling the component concentrations as functions of test parameters using stepwise regression with two different model forms. The resulting models were used in an equivalent performance approach to calculate values of scaling exponents (for a simple geometric scaling relationship) as functions of the parameters in the component concentration models. The resulting models and scaling exponents are displayed in tables and graphically. The sensitivities of component concentrations and scaling exponents to the test parameters are presented graphically. These results will serve as inputs to subsequent work by other researchers to develop scaling relationships that are applicable to full-scale tanks.

Piepel, Gregory F.; Holmes, Aimee E.; Heredia-Langner, Alejandro; Lee, Kearn P.; Kelly, Steven E.

2014-01-01T23:59:59.000Z

372

2008 B20 Survey Results (Presentation)  

SciTech Connect (OSTI)

Describes results of a sample survey of the quality of B20, a biodiesel blend, collected from U.S. public pumps and fleets as part of a joint effort by NREL, the NBB, and engine manufacturers.

Alleman, T. L.; McCormick, R. L.

2009-02-02T23:59:59.000Z

373

Water Loss Test Results Main 'J' Canal Delta Lake Irrigation District  

E-Print Network [OSTI]

Program and Discussion Table 2. Additional Test Result Information for the Main ?J? Canal Figure 3. Photo showing the GPS survey and a staff gage Figure 4. Small earthen dam upstream of the lateral head-gate Appendix Detailed Test Results... (Figure 1), the concrete lined section of the main supply canal that feeds the City of Raymondville, flows west to east in the northeastern sector of the district (see figure 2); located approximately four miles west of US Hwy 77 and a mile north of FM...

Leigh, E.; Fipps, G.

374

Experimental results of single screw mechanical tests: a follow-up to SAND2005-6036.  

SciTech Connect (OSTI)

The work reported here was conducted to address issues raised regarding mechanical testing of attachment screws described in SAND2005-6036, as well as to increase the understanding of screw behavior through additional testing. Efforts were made to evaluate fixture modifications and address issues of interest, including: fabrication of 45{sup o} test fixtures, measurement of the frictional load from the angled fixture guide, employment of electromechanical displacement transducers, development of a single-shear test, and study the affect of thread start orientation on single-shear behavior. A286 and 302HQ, No.10-32 socket-head cap screws were tested having orientations with respect to the primary loading axis of 0{sup 0}, 45{sup o}, 60{sup o}, 75{sup o} and 90{sup o} at stroke speeds 0,001 and 10 in/sec. The frictional load resulting from the angled screw fixture guide was insignificant. Load-displacement curves of A286 screws did not show a minimum value in displacement to failure (DTF) for 60{sup o} shear tests. Tests of 302HQ screws did not produce a consistent trend in DTF with load angle. The effect of displacement rate on DTF became larger as shear angle increased for both A286 and 302HQ screws.

Lee, Sandwook; Lee, Kenneth L.; Korellis, John S.; McFadden, Sam X.

2006-08-01T23:59:59.000Z

375

Performance of Charcoal Cookstoves for Haiti Part 1: Results from the Water Boiling Test  

SciTech Connect (OSTI)

In April 2010, a team of scientists and engineers from Lawrence Berkeley National Lab (LBNL) and UC Berkeley, with support from the Darfur Stoves Project (DSP), undertook a fact-finding mission to Haiti in order to assess needs and opportunities for cookstove intervention. Based on data collected from informal interviews with Haitians and NGOs, the team, Scott Sadlon, Robert Cheng, and Kayje Booker, identified and recommended stove testing and comparison as a high priority need that could be filled by LBNL. In response to that recommendation, five charcoal stoves were tested at the LBNL stove testing facility using a modified form of version 3 of the Shell Foundation Household Energy Project Water Boiling Test (WBT). The original protocol is available online. Stoves were tested for time to boil, thermal efficiency, specific fuel consumption, and emissions of CO, CO{sub 2}, and the ratio of CO/CO{sub 2}. In addition, Haitian user feedback and field observations over a subset of the stoves were combined with the experiences of the laboratory testing technicians to evaluate the usability of the stoves and their appropriateness for Haitian cooking. The laboratory results from emissions and efficiency testing and conclusions regarding usability of the stoves are presented in this report.

Booker, Kayje; Han, Tae Won; Granderson, Jessica; Jones, Jennifer; Lsk, Kathleen; Yang, Nina; Gadgil, Ashok

2011-06-01T23:59:59.000Z

376

Diesel Engine Idling Test  

SciTech Connect (OSTI)

In support of the Department of Energy’s FreedomCAR and Vehicle Technology Program Office goal to minimize diesel engine idling and reduce the consumption of millions of gallons of diesel fuel consumed during heavy vehicle idling periods, the Idaho National Laboratory (INL) conducted tests to characterize diesel engine wear rates caused by extended periods of idling. INL idled two fleet buses equipped with Detroit Diesel Series 50 engines, each for 1,000 hours. Engine wear metals were characterized from weekly oil analysis samples and destructive filter analyses. Full-flow and the bypass filter cartridges were removed at four stages of the testing and sent to an oil analysis laboratory for destructive analysis to ascertain the metals captured in the filters and to establish wear rate trends. Weekly samples were sent to two independent oil analysis laboratories. Concurrent with the filter analysis, a comprehensive array of other laboratory tests ascertained the condition of the oil, wear particle types, and ferrous particles. Extensive ferrogram testing physically showed the concentration of iron particles and associated debris in the oil. The tests results did not show the dramatic results anticipated but did show wear trends. New West Technologies, LLC, a DOE support company, supplied technical support and data analysis throughout the idle test.

Larry Zirker; James Francfort; Jordon Fielding

2006-02-01T23:59:59.000Z

377

Motor Vehicle Fleet Emissions by K I M B E R L Y S . B R A D L E Y ,  

E-Print Network [OSTI]

Motor Vehicle Fleet Emissions by OP-FTIR K I M B E R L Y S . B R A D L E Y , K E V I N B . B R O O concentrations of carbon monoxide (CO), carbon dioxide (CO2), and nitrous oxide (N2O) caused by emissions from to average emissions results obtained from on-road exhaust analysis using individual vehicle remote sensing

Denver, University of

378

Experimental results from pressure testing a 1:6-scale nuclear power plant containment  

SciTech Connect (OSTI)

This report discusses the testing of a 1:6-scale, reinforced-concrete containment building at Sandia National Laboratories, in Albuquerque, New Mexico. The scale-model, Light Water Reactor (LWR) containment building was designed and built to the American Society of Mechanical Engineers (ASME) code by United Engineers and Constructors, Inc., and was instrumented with over 1200 transducers to prepare for the test. The containment model was tested to failure to determine its response to static internal overpressurization. As part of the US Nuclear Regulatory Commission`s program on containment integrity, the test results will be used to assess the capability of analytical methods to predict the performance of containments under severe-accident loads. The scaled dimensions of the cylindrical wall and hemispherical dome were typical of a full-size containment. Other typical features included in the heavily reinforced model were equipment hatches, personnel air locks, several small piping penetrations, and a ihin steel liner that was attached to the concrete by headed studs. In addition to the transducers attached to the model, an acoustic detection system and several video and still cameras were used during testing to gather data and to aid in the conduct of the test. The model and its instrumentation are briefly discussed, and is followed by the testing procedures and measured response of the containment model. A summary discussion is included to aid in understanding the significance of the test as it applies to real world reinforced concrete containment structures. The data gathered during SIT and overpressure testing are included as an appendix.

Horschel, D.S. [Sandia National Labs., Albuquerque, NM (United States)

1992-01-01T23:59:59.000Z

379

Reliability of electrochemical noise measurements: results of round-robin testing on electrochemical noise  

E-Print Network [OSTI]

1 Reliability of electrochemical noise measurements: results of round-robin testing on electrochemical noise Rik-Wouter BOSCHa , Robert A. COTTISb,* , Kinga CSECSc , Thomas DORSCHc , Lucia DUNBARd), Switzerland; p) University of Cadiz, Spain. Abstract Sixteen laboratories have performed electrochemical noise

380

Ponding Test Results Seepage and Total Losses Main Canal B Hidalgo County Irrigation District No. 16  

E-Print Network [OSTI]

TR-325 2008 Ponding Test Results Seepage and Total Losses Main Canal B Hidalgo County Irrigation District No. 16 Eric Leigh Texas AgriLife Extension Associate, Biological and Agricultural Engineering... MAIN CANAL B HIDALGO COUNTY IRRIGATION DISTRICT NO. 16 Report Prepared by: Eric Leigh and Guy Fipps,1 P.E. February 17, 2004 IRRIGATION TECHNOLOGY CENTER Texas Cooperative Extension - Texas Agricultural...

Leigh, E.; Fipps, G.

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Results from evaporation tests to support the MWTF heat removal system design  

SciTech Connect (OSTI)

An experimental tests program was conducted to measure the evaporative heat removal from the surface of a tank of simulated waste. The results contained in this report constitute definition design data for the latest heat removal function of the MWTF primary ventilation system.

Crea, B.A.

1994-12-22T23:59:59.000Z

382

Preliminary Results in Virtual Testing for Smart Buildings Julien Bruneau1  

E-Print Network [OSTI]

POSTER Preliminary Results in Virtual Testing for Smart Buildings Julien Bruneau1 , Charles Consel1, Walid.Taha@hh.se 4 HVAC Consultant, Cairo, Egypt, wail_hannourah@yahoo.com Abstract. Smart buildings have significant impact on the quality and cost of these services. However, a smart building and any

Boyer, Edmond

383

Election Results and Opportunistic Policies: A New Test of the Rational Political Business Cycle Model  

E-Print Network [OSTI]

Election Results and Opportunistic Policies: A New Test of the Rational Political Business Cycle Model#3; Toke S. Aidtay Francisco José Veigab Linda Gonçalves Veigac aUniversity of Cambridge, Faculty of Economics, Sidgwick Avenue Cambridge, CB3 9DD... . These results are consistent with the theoretical model. Keywords: Voting and popularity functions, opportunism, rational political busi- ness cycles, local government, system estimation, Portugal. JEL codes: D72, E32, H72. #3;The authors acknowledge helpful...

Aidt, Toke S; Veiga, F J; Veiga, L G

384

Results of the DF-4 BWR (boiling water reactor) control blade-channel box test  

SciTech Connect (OSTI)

The DF-4 in-pile fuel damage experiment investigated the behavior of boiling water reactor (BWR) fuel canisters and control blades in the high temperature environment of an unrecovered reactor accident. This experiment, which was carried out in the Annular Core Research Reactor (ACRR) at Sandia National Laboratories, was performed under the USNRC's internationally sponsored severe fuel damage (SFD) program. The DF-4 test is described herein and results from the experiment are presented. Important findings from the DF-4 test include the low temperature melting of the stainless steel control blade caused by reaction with the B{sub 4}C, and the subsequent low temperature attack of the Zr-4 channel box by the relocating molten blade components. Hydrogen generation was found to continue throughout the experiment, diminishing slightly following the relocation of molten oxidizing zircaloy to the lower extreme of the test bundle. A large blockage which was formed from this material continued to oxidize while steam was being fed into the the test bundle. The results of this test have provided information on the initial stages of core melt progression in BWR geometry involving the heatup and cladding oxidation stages of a severe accident and terminating at the point of melting and relocation of the metallic core components. The information is useful in modeling melt progression in BWR core geometry, and provides engineering insight into the key phenomena controlling these processes. 12 refs., 12 figs.

Gauntt, R.O.; Gasser, R.D.

1990-10-01T23:59:59.000Z

385

Air Monitoring Network at Tonopah Test Range: Network Description, Capabilities, and Analytical Results  

SciTech Connect (OSTI)

During the period April to June 2008, at the behest of the Department of Energy (DOE), National Nuclear Security Administration, Nevada Site Office (NNSA/NSO); the Desert Research Institute (DRI) constructed and deployed two portable environmental monitoring stations at the Tonopah Test Range (TTR) as part of the Environmental Restoration Project Soils Activity. DRI has operated these stations since that time. A third station was deployed in the period May to September 2011. The TTR is located within the northwest corner of the Nevada Test and Training Range (NTTR), and covers an area of approximately 725.20 km2 (280 mi2). The primary objective of the monitoring stations is to evaluate whether and under what conditions there is wind transport of radiological contaminants from Soils Corrective Action Units (CAUs) associated with Operation Roller Coaster on TTR. Operation Roller Coaster was a series of tests, conducted in 1963, designed to examine the stability and dispersal of plutonium in storage and transportation accidents. These tests did not result in any nuclear explosive yield. However, the tests did result in the dispersal of plutonium and contamination of surface soils in the surrounding area.

Hartwell William T.,Daniels Jeffrey,Nikolich George,Shadel Craig,Giles Ken,Karr Lynn,Kluesner Tammy

2012-01-01T23:59:59.000Z

386

Results of scoping tests in corium-water thermal interactions in ex-vessel geometry  

SciTech Connect (OSTI)

Results of scoping tests are reported which were performed in the ANL/EPRI Corium Ex-vessel interactions (COREXIT) Facility located at ANL. These tests are examining issues related to containment loading (i.e., steam generation, H/sub 2/ production, and debris dispersal) for hypothetical LWR accidents that are postulated to progress to the point of molten corium breaching the vessel bottom head and entering the reactor cavity. The geometry selected for these tests is a 1 : 30 linear scale of the Zion PWR containment design in which the cavity is connected to the containment volume by an open tunnel through which pass the in-core detector guide tubes. The effects of the corium-water mixing modes were investigated in the first two tests in the series. In test CWTI-1 the molten corium was ejected into water which filled the cavity mockup volume to one-half the passageway height. In CWTI-2, the molten corium was dropped atop the refractory base in the cavity mockup without the presence of water, and water was injected atop the corium melt immediately afterward as per accumulator discharge. These tests have shown significant differences in fuel fragmentation, steam generation rate, hydrogen production, and fuel dispersal. Particularly noteworthy was the significant amount of dispersal of both water and corium debris from the cavity mockup due to the initially rapid steam generation rate in CWTI-1.

Spencer, B.W.; McUmber, L.; Sehgal, B.R.; Sienicki, J.J.; Squarer, D.

1983-01-01T23:59:59.000Z

387

Final test results for the Schott HCE on a LS-2 collector.  

SciTech Connect (OSTI)

Sandia National Laboratories has completed thermal performance testing on the Schott parabolic trough receiver using the LS-2 collector on the Sandia rotating platform at the National Solar Thermal Test Facility in Albuquerque, NM. This testing was funded as part of the US DOE Sun-Lab USA-Trough program. The receiver tested was a new Schott receiver, known as Heat Collector Elements (HCEs). Schott is a new manufacturer of trough HCEs. The Schott HCEs are 4m long; therefore, two were joined and mounted on the LS-2 collector module for the test. The Schott HCE design consists of a 70mm diameter high solar absorptance coated stainless steel (SS) tube encapsulated within a 125mm diameter Pyrex{reg_sign} glass tube with vacuum in the annulus formed between the SS and glass tube to minimize convection heat losses. The Schott HCE design is unique in two regards. First, the bellows used to compensate for the difference in thermal expansion between the metal and glass tube are inside the glass envelope rather than outside. Second, the composition of materials at the glass-to-metal seal has very similar thermal expansion coefficients making the joint less prone to breakage from thermal shock. Sandia National Laboratories provided both the azimuth and elevation collector module tracking systems used during the tests. The test results showed the efficiency of the Schott HCE to be very similar to current HCEs being manufactured by Solel. This testing provided performance verification for the use of Schott tubes with Solargenix trough collector assemblies at currently planned trough power plant projects in Arizona and Nevada.

Moss, Timothy A.; Brosseau, Douglas A.

2005-07-01T23:59:59.000Z

388

Advanced Technology Vehicle Testing  

SciTech Connect (OSTI)

The goal of the U.S. Department of Energy's Advanced Vehicle Testing Activity (AVTA) is to increase the body of knowledge as well as the awareness and acceptance of electric drive and other advanced technology vehicles (ATV). The AVTA accomplishes this goal by testing ATVs on test tracks and dynamometers (Baseline Performance testing), as well as in real-world applications (Fleet and Accelerated Reliability testing and public demonstrations). This enables the AVTA to provide Federal and private fleet managers, as well as other potential ATV users, with accurate and unbiased information on vehicle performance and infrastructure needs so they can make informed decisions about acquiring and operating ATVs. The ATVs currently in testing include vehicles that burn gaseous hydrogen (H2) fuel and hydrogen/CNG (H/CNG) blended fuels in internal combustion engines (ICE), and hybrid electric (HEV), urban electric, and neighborhood electric vehicles. The AVTA is part of DOE's FreedomCAR and Vehicle Technologies Program.

James Francfort

2004-06-01T23:59:59.000Z

389

Test results of a ceramic-based carbon monoxide sensor in the automotive exhaust manifold  

SciTech Connect (OSTI)

A prototype CO sensor based on the anatase phase of TiO{sub 2} was fabricated and tested in a Ford V6 engine. Fuel combustion was programmed to be near stoichiometric conditions, and emissions were monitored with an FT-IR analytical instrument. The sensor, positioned near the oxygen sensor in the exhaust manifold, was successfully tested for 50 cycles of revving and idling, and was observed to respond quickly and reproducibly. The sensor response was correlated to the CO concentration at specific engine temperatures and was found to vary systematically with increasing concentrations. The results are promising and the sensor shows potentials to monitor the efficiency of the catalytic converter.

Azad, A.M.; Younkman, L.B.; Akbar, S.A. [Ohio State Univ., Columbus, OH (United States)

1996-12-31T23:59:59.000Z

390

Vertical and horizontal test results of 3.9-GHz accelerating cavities at FNAL  

SciTech Connect (OSTI)

The 3rd harmonic 3.9GHz accelerating cavity was proposed to improve the beam performance of the VUV FEL, FLASH. In the frame of a collaborative agreement, Fermilab will provide DESY with a cryomodule containing a string of four cavities. Seven 9-cell Nb cavities were tested and six of them did reach accelerating gradient up to 24 MV/m almost twice more than design value of 14 MV/m. Two of these cavities are with new HOM couplers with improved design. In this paper we present all results of the vertical and horizontal tests.

Khabiboulline, T.; Edwards, H.; Foley, M.; Harms, E.; Hocker, James Andrew; Mitchell, D.; Rowe, A.; Solyak, N.; /Fermilab

2008-06-01T23:59:59.000Z

391

Sample Results From The Next Generation Solvent Program Real Waste Extraction-Scrub-Strip Testing  

SciTech Connect (OSTI)

Savannah River National Laboratory (SRNL) performed multiple Extraction-Scrub-Strip (ESS) testing using real waste solutions, and three Next Generation Solvent (NGS) variations, which included radiologically clean pure NGS, a blend of radiologically clean NGS and radiologically clean BOBCalixC6 (NGS-MCU), and a blend of radiologically clean NGS and radiologically contaminated BOBCalixC6 from the MCU Solvent system. The results from the tests indicate that both the NGS and the NGS-MCU blend exhibit adequate extraction, scrub and strip behavior.

Peters, T. B.; Washington, A. L. II

2013-08-08T23:59:59.000Z

392

SAMPLE RESULTS FROM THE NEXT GENERATION SOLVENT PROGRAM REAL WASTE EXTRACTION-SCRUB-STRIP TESTING  

SciTech Connect (OSTI)

Savannah River National Laboratory (SRNL) performed multiple Extraction-Scrub-Strip (ESS) testing using real waste solutions, and three Next Generation Solvent (NGS) variations, which included radiologically clean pure NGS, a blend of radiologically clean NGS and radiologically clean BOBCalixC6 (NGS-MCU), and a blend of radiologically clean NGS and radiologically contaminated BOBCalixC6 from the MCU Solvent system. The results from the tests indicate that both the NGS and the NGS-MCU blend exhibit adequate extraction, scrub and strip behavior.

Peters, T.; Washington, A.

2013-06-03T23:59:59.000Z

393

Secondary Waste Form Screening Test Results—Cast Stone and Alkali Alumino-Silicate Geopolymer  

SciTech Connect (OSTI)

PNNL is conducting screening tests on the candidate waste forms to provide a basis for comparison and to resolve the formulation and data needs identified in the literature review. This report documents the screening test results on the Cast Stone cementitious waste form and the Geopolymer waste form. Test results suggest that both the Cast Stone and Geopolymer appear to be viable waste forms for the solidification of the secondary liquid wastes to be treated in the ETF. The diffusivity for technetium from the Cast Stone monoliths was in the range of 1.2 × 10-11 to 2.3 × 10-13 cm2/s during the 63 days of testing. The diffusivity for technetium from the Geopolymer was in the range of 1.7 × 10-10 to 3.8 × 10-12 cm2/s through the 63 days of the test. These values compare with a target of 1 × 10-9 cm2/s or less. The Geopolymer continues to show some fabrication issues with the diffusivities ranging from 1.7 × 10-10 to 3.8 × 10-12 cm2/s for the better-performing batch to from 1.2 × 10-9 to 1.8 × 10-11 cm2/s for the poorer-performing batch. In the future more comprehensive and longer term performance testing will be conducted, to further evaluate whether or not these waste forms will meet the regulation and performance criteria needed to cost-effectively dispose of secondary wastes.

Pierce, Eric M.; Cantrell, Kirk J.; Westsik, Joseph H.; Parker, Kent E.; Um, Wooyong; Valenta, Michelle M.; Serne, R. Jeffrey

2010-06-28T23:59:59.000Z

394

Enhancements in Glovebox Design Resulting from Laboratory-Conducted FIre Tests  

SciTech Connect (OSTI)

The primary mission of the Pit Disassembly and Conversion Facility (PDCF) Project was to disassemble nuclear weapons pits and convert the resulting special nuclear materials to a form suitable for further disposition. Because of the nature of materials involved, the fundamental system which allowed PDCF to perform its mission was a series of integrated and interconnected gloveboxes which provided confinement and containment of the radioactive materials being processed. The high throughput planned for PDCF and the relatively high neutron and gamma radiation levels of the pits required that gloveboxes be shielded to meet worker dose limits. The glovebox shielding material was required to contain high hydrogen concentrations which typically result in these materials being combustible. High combustible loadings created design challenges for the facility fire suppression and ventilation system design. Combustible loading estimates for the PDCF Plutonium (Pu) Processing Building increased significantly due to these shielding requirements. As a result, the estimates of combustible loading substantially exceeded values used to support fire and facility safety analyses. To ensure a valid basis for combustible loading contributed by the glovebox system, the PDCF Project funded a series of fire tests conducted by the Southwest Research Institute on door panels and a representative glovebox containing Water Extended Polyester (WEP) radiological shielding to observe their behavior during a fire event. Improvements to PDCF glovebox designs were implemented based on lessons learned during the fire test. In particular, methods were developed to provide high levels of neutron shielding while maintaining combustible loading in the glovebox shells at low levels. Additionally, the fire test results led to design modifications to mitigate pressure increases observed during the fire test in order to maintain the integrity of the WEP cladding. These changes resulted in significantly reducing the credited combustible loading of the facility. These advances in glovebox design should be considered for application in nuclear facilities within the Department of Energy complex in the future.

Brooks, Kriston P.; Wunderlich, Gregory M.; Mcentire, James R.; Richmond, William G.

2013-06-14T23:59:59.000Z

395

Re-evaluation of the 1995 Hanford Large Scale Drum Fire Test Results  

SciTech Connect (OSTI)

A large-scale drum performance test was conducted at the Hanford Site in June 1995, in which over one hundred (100) 55-gal drums in each of two storage configurations were subjected to severe fuel pool fires. The two storage configurations in the test were pallet storage and rack storage. The description and results of the large-scale drum test at the Hanford Site were reported in WHC-SD-WM-TRP-246, ''Solid Waste Drum Array Fire Performance,'' Rev. 0, 1995. This was one of the main references used to develop the analytical methodology to predict drum failures in WHC-SD-SQA-ANAL-501, 'Fire Protection Guide for Waste Drum Storage Array,'' September 1996. Three drum failure modes were observed from the test reported in WHC-SD-WM-TRP-246. They consisted of seal failure, lid warping, and catastrophic lid ejection. There was no discernible failure criterion that distinguished one failure mode from another. Hence, all three failure modes were treated equally for the purpose of determining the number of failed drums. General observations from the results of the test are as follows: {lg_bullet} Trash expulsion was negligible. {lg_bullet} Flame impingement was identified as the main cause for failure. {lg_bullet} The range of drum temperatures at failure was 600 C to 800 C. This is above the yield strength temperature for steel, approximately 540 C (1,000 F). {lg_bullet} The critical heat flux required for failure is above 45 kW/m{sup 2}. {lg_bullet} Fire propagation from one drum to the next was not observed. The statistical evaluation of the test results using, for example, the student's t-distribution, will demonstrate that the failure criteria for TRU waste drums currently employed at nuclear facilities are very conservative relative to the large-scale test results. Hence, the safety analysis utilizing the general criteria described in the five bullets above will lead to a technically robust and defensible product that bounds the potential consequences from postulated fires in TRU waste facilities, the means of storage in which are the Type A, 55-gal drums.

Yang, J M

2007-05-02T23:59:59.000Z

396

Impacts of ethanol fuel level on emissions of regulated and unregulated pollutants from a fleet of gasoline light-duty vehicles  

SciTech Connect (OSTI)

The study investigated the impact of ethanol blends on criteria emissions (THC, NMHC, CO, NOx), greenhouse gas (CO2), and a suite of unregulated pollutants in a fleet of gasoline-powered light-duty vehicles. The vehicles ranged in model year from 1984 to 2007 and included one Flexible Fuel Vehicle (FFV). Emission and fuel consumption measurements were performed in duplicate or triplicate over the Federal Test Procedure (FTP) driving cycle using a chassis dynamometer for four fuels in each of seven vehicles. The test fuels included a CARB phase 2 certification fuel with 11% MTBE content, a CARB phase 3 certification fuel with a 5.7% ethanol content, and E10, E20, E50, and E85 fuels. In most cases, THC and NMHC emissions were lower with the ethanol blends, while the use of E85 resulted in increases of THC and NMHC for the FFV. CO emissions were lower with ethanol blends for all vehicles and significantly decreased for earlier model vehicles. Results for NOx emissions were mixed, with some older vehicles showing increases with increasing ethanol level, while other vehicles showed either no impact or a slight, but not statistically significant, decrease. CO2 emissions did not show any significant trends. Fuel economy showed decreasing trends with increasing ethanol content in later model vehicles. There was also a consistent trend of increasing acetaldehyde emissions with increasing ethanol level, but other carbonyls did not show strong trends. The use of E85 resulted in significantly higher formaldehyde and acetaldehyde emissions than the specification fuels or other ethanol blends. BTEX and 1,3-butadiene emissions were lower with ethanol blends compared to the CARB 2 fuel, and were almost undetectable from the E85 fuel. The largest contribution to total carbonyls and other toxics was during the cold-start phase of FTP.

Karavalakis, Georgios; Durbin, Thomas; Shrivastava, ManishKumar B.; Zheng, Zhongqing; Villella, Phillip M.; Jung, Hee-Jung

2012-03-30T23:59:59.000Z

397

PDM performance Test Results and Preliminary Analysis: Incompressible and Compressible Fluids  

SciTech Connect (OSTI)

Three, small diameter, Moineau, positive displacement (drilling) motors (PDMs) were dynamometer tested using water, air-water mist, air-water foam, and aerated water. The motors included (1) a 1.5-inch OD, single-lobe mud motor; (2) a 1.69-inch OD, 5:6 multi-lobe mud motor; and (3) a 1.75-inch OD, 5:6 multi-lobe air motor. This paper describes the test apparatus, procedures, data analysis, and results. Incompressible and compressible fluid performance are compared; linear performance, predicted by a positive displacement motor model, is identified where it occurs. Preliminary results and conclusions are (1) the performance of all three motors is accurately modeled using a two-variable, linear model for incompressible fluid and (2) the model was not successfully adapted to model compressible fluid performance.

Dreesen, D.S.; Gruenhagan, E.; Cohen, J.C.; Moran, D.W.

1999-02-01T23:59:59.000Z

398

The Luminosity Monitoring System for the LHC: Modeling and Test Results  

SciTech Connect (OSTI)

Simulation results of the Beam Rate of Neutrals (BRAN) luminosity detector for the CERN Large Hadron Collider are presented. The detectors are intended to measure the bunch-by-bunch relative luminosity at the ATLAS and CMS experiments. Building up from experimental results from test runs at the SPS, RHIC and ALS we extend the simulated setup to the TAN neutral absorbers located at 140 m at both sides the IP1 and IP5 interaction points. The expected signal amplitudes are calculated for pp-collisions energies between 450 GeV and 7 TeV using the Monte Carlo package FLUKA and its graphical user interface FLAIR.

Ratti, A.; Beche, J.F.; Byrd, J.; Chow, K.; Denes, P.; Doolittle, L.; Ghiorso, W.; Manfredi, P.F.; Matis, H.; Monroy, M.; Plate, D.; Stezelberger, T.; Stiller, J.; Turko, B.; Turner, W.C.; Yaver, H.; Zimmermann, S.; Bravin, E.; Drees, A.; Miyamoto, R.

2009-10-25T23:59:59.000Z

399

Evaluation of coal-derived liquids as boiler fuels. Volume 2: boiler test results. Final report  

SciTech Connect (OSTI)

A combustion demonstration using six coal-derived liquid (CDL) fuels was conducted on a utility boiler located at the Plant Sweatt Electric Generating Station of Mississippi Power Company in Meridian, Mississippi. The test program was conducted in two phases. The first phase included the combustion tests of the two conventional fuels (natural gas and No. 6 fuel oil) and three coal-derived liquid fuels (Solvent Refined Coal-II full range distillate, H-Coal heavy distillate and H-Coal blended distillate). The second phase involved the evaluation of three additional CDL fuels (H-Coal light distillate, Exxon Donor Solvent full range distillate and Solvent Refined Coal-II middle distillate). The test boiler was a front wall-fired Babcock and Wilcox unit with a rated steam flow of 425,000 lb/h and a generating capacity of 40 MW. Boiler performance and emissions were evaluated with baseline and CDL fuels at 15, 25, 40 MW loads and at various excess air levels. Low NO/sub x/ (staged) combustion techniques were also implemented. Boiler performance monitoring included measurements for fuel steam and flue gas flow, pressure, temperature, and heat absorption, resulting in a calculated combustion efficiency, boiler efficiency, and heat rate. Emissions measurements included oxygen, carbon dioxide, carbon monoxide, oxides of nitrogen, sulfur dioxide, sulfur trioxide, acid dewpoint, particulate mass, size distribution and morphology, chlorides, and opacity. The test program demonstrated the general suitability of CDL fuels for use in existing oil-fired utility boilers. No significant boiler tube surface modifications will be required. The CDL fuels could be handled similarly to No. 2 oil with appropriate safety procedures and materials compatibility considerations. Volume 2 of a five-volume report contains the detailed boiler test results. 96 figs., 26 tabs.

Not Available

1985-09-01T23:59:59.000Z

400

Field testing results for the strategic petroleum reserve pipeline corrosion control program  

SciTech Connect (OSTI)

Results of two studies conducted as part of the Strategic Petroleum Reserve (SPR) Pipeline Corrosion Control Program are reported. These studies focused on evaluation of rotary-applied concrete materials for internal pipeline protection against the erosive and corrosive effects of flowing brine. The study also included evaluation of liners applied by hand on pipe pieces that cannot be lined by rotary methods. Such pipe pieces include tees, elbows and flanged pipe sections. Results are reported from a corrosion survey of 17 different liner formulations tested at the-Big-Rill SPR Site. Testing consisted of electrochemical corrosion rate measurements made on lined pipe sections exposed, in a test manifold, to flowing SPR generated fluids. Testing also involved cumulative immersion exposure where samples were exposed to static site-generated brine for increasing periods of time. Samples were returned to the laboratory for various diagnostic analyses. Results of this study showed that standard calcium silicate concrete (API RP10E) and a rotary calcium aluminate concrete formulation were excellent performers. Hand-lined pipe pieces did not provide as much corrosion protection. The focus of the second part of the study was on further evaluation of the calcium silicate, calcium aluminate and hand-applied liners in actual SPR equipment and service. It was a further objective to assess the practicality of electrochemical impedance spectroscopy (EIS) for field corrosion monitoring of concrete lined pipe compared to the more well-known linear polarization technique. This study showed that concrete linings reduced the corrosion rate for bare steel from 10 to 15 mils per year to 1 mil per year or less. Again, the hand-applied liners did not provide as much corrosion protection as the rotary-applied liners. The EIS technique was found to be robust for field corrosion measurements. Mechanistic and kinetic corrosion rate data were reliably obtained.

Buchheit, R.G.; Maestas, L.M.; Hinkebein, T.E.

1998-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Pollution prevention opportunity assessment for Sandia National Laboratories/New Mexico's fleet services department.  

SciTech Connect (OSTI)

This Pollution Prevention Opportunity Assessment (PPOA) was conducted for the Sandia National Laboratories/New Mexico's (SNL/NM) Fleet Services Department between December 2001 and August 2002. This is the third PPOA conducted at Fleet in the last decade. The primary purpose of this PPOA was to review progress of past initiatives and to provide recommendations for future waste reduction measures of hazardous and solid waste streams and increasing the purchase of environmentally friendly products. This report contains a summary of the information collected and analyses performed with recommended options for implementation. The Sandia National Laboratories/New Mexico Pollution Prevention Group will work with SNL/NM's Fleet Services to implement these options.

Richardson, Anastasia Dawn

2003-06-01T23:59:59.000Z

402

High Temperature Solid-Oxide Electrolyzer 2500 Hour Test Results At The Idaho National Laboratory  

SciTech Connect (OSTI)

The Idaho National Laboratory (INL) has been developing the concept of using solid oxide fuel cells as electrolyzers for large-scale, high-temperature (efficient), hydrogen production. This program is sponsored by the U.S. Department of Energy under the Nuclear Hydrogen Initiative. Utilizing a fuel cell as an electrolyzer introduces some inherent differences in cell operating conditions. In particular, the performance of fuel cells operated as electrolyzers degrades with time faster. This issue of electrolyzer cell and stack performance degradation over time has been identified as a major barrier to technology development. Consequently, the INL has been working together with Ceramatec, Inc. (Salt Lake City, Utah) to improve the long-term performance of high temperature electrolyzers. As part of this research partnership, the INL conducted a 2500 hour test of a Ceramatec designed and produced stack operated in the electrolysis mode. This paper will provide a summary of experimental results to date for this ongoing test.

Carl Stoots; James O'Brien; Stephen Herring; Keith Condie; Lisa Moore-McAteer; Joseph J. Hartvigsen; Dennis Larsen

2009-11-01T23:59:59.000Z

403

Testing Results of the Prototype Beam Absorber for the PXIE MEBT  

E-Print Network [OSTI]

One of the goals of the PXIE program at Fermilab is to demonstrate the capability to form an arbitrary bunch pattern from an initially CW 162.5 MHz H^{-} bunch train coming out of an RFQ. The bunch-by-bunch selection will take place in the 2.1 MeV Medium Energy Beam Transport (MEBT) by directing the undesired bunches onto an absorber that needs to withstand a beam power of up to 21 kW, focused onto a spot with a ~2 mm rms radius. A prototype of the absorber was manufactured from molybdenum alloy TZM, and tested with an electron beam up to the peak surface power density required for PXIE, 17W/mm2. Temperatures and flow parameters were measured and compared to analysis. This paper describes the absorber prototype and key testing results.

Baffes, Curtis

2015-01-01T23:59:59.000Z

404

Los Alamos passive test cell results for the 1981-82 winter  

SciTech Connect (OSTI)

This report covers Los Alamos test cell operation during the winter of 1981-82 including comparisons with the 1980-81 winter. Extensive data have been taken and computer-analyzed to determine performance parameters such as efficiency, solar savings fraction, and discomfort index. The data from different test cells are directly comparable because each has similar heating-load coefficient and collector area. Configurations include direct gain, unvented Trombe walls, water wall, phase-change wall, and sunspaces. Strategies for reducing heat loss include selective surfaces, two types of improved glazing systems, a heat pipe system, and convection suppression baffles. Significant differences in both auxiliary heat and comfort were observed among the various system types. The results are useful, not only for direct system comparisons, but also to provide data for validation of computer simulation programs. Availability of hourly data is described.

McFarland, R.D.; Hedstrom, J.C.; Balcomb, J.D.; Moore, S.W.

1982-10-01T23:59:59.000Z

405

Byggmeister Test Home: Analysis and Initial Results of Cold Climate Wood-Framed Home Retrofit  

SciTech Connect (OSTI)

BSC seeks to further the energy efficiency market for New England area retrofit projects by supporting projects that are based on solid building science fundamentals and verified implementation. With the high exposure of energy efficiency and retrofit terminology being used in the general media at this time, it is important to have evidence that measures being proposed will in fact benefit the homeowner through a combination of energy savings, improved durability, and occupant comfort. There are several basic areas of research to which the technical report for these test homes can be expected to contribute. These include the combination of measures that is feasible, affordable and acceptable to homeowners as well as expectations versus results. Two Byggmeister multi-family test homes in Massachusetts are examined with the goal of providing case studies that could be applied to other similar New England homes.

Gates, C.

2013-01-01T23:59:59.000Z

406

High-power baseline and motoring test results for the GPU-3 Stirling engine  

SciTech Connect (OSTI)

In support of the Department of Energy's Stirling Engine Highway Vehicle Systems program, the NASA Lewis Research Center has installed a 7.5-kilowatt (10-hp) GPU-3 Stirling engine with a motoring dynamometer to continue to obtain data for validating Stirling-cycle computer simulations and to prepare for future component testing. The engine was originally built by General Motors Research Laboratories for the US Army in 1965 as part of a 3-kilowatt engine-generator set. Baseline tests were run to map the engine over a range of mean compression-space pressures of 2.8 to 6.9 megapascals (400 to 1000 psi) and engine speeds of 1500 to 3500 rpm with both helium and hydrogen as the working fluid. All tests were run at a heater-tube gas temperature of 677/sup 0/C (1250/sup 0/F). Maximum power obtained with hydrogen was 6.82 kilowatts (9.14 hp) at 6.9 megapascals (1000 psi) and 3500 rpm. The maximum power with helium was 4.26 kilowatts (5.71 hp) at 6.9 megapascals (1000 psi) and 2500 rpm. The highest brake thermal efficiencies obtained were 26.4 percent for hydrogen and 21.3 percent for helium. These both occurred at 6.9-megapascal (1000-psi) mean compression-space pressure and 1500-rpm engine speed. The engine output was low at high speeds as compared with that for the previously reported low-power baseline tests that used the alternator and resistance load bank instead of the dynamometer. It is felt that this reduced power was caused by degradation of heat exchanger effectiveness as a result of contamination by rust and oil. However, efficiency was higher than in the previous tests because of the installation of a noncontaminated preheater that reduced combustion system losses.

Thieme, L.G.

1981-06-01T23:59:59.000Z

407

Results from NNWSI [Nevada Nuclear Waste Storage Investigations] Series 2 bare fuel dissolution tests  

SciTech Connect (OSTI)

The dissolution and radionuclide release behavior of spent fuel in groundwater is being studied by the Nevada Nuclear Waste Storage Investigations (NNWSI) Project. Two bare spent fuel specimens plus the empty cladding hulls were tested in NNWSI J-13 well water in unsealed fused silica vessels under ambient hot cell air conditions (25{degree}C) in the currently reported tests. One of the specimens was prepared from a rod irradiated in the H. B. Robinson Unit 2 reactor and the other from a rod irradiated in the Turkey Point Unit 3 reactor. Results indicate that most radionuclides of interest fall into three groups for release modeling. The first group principally includes the actinides (U, Np, Pu, Am, and Cm), all of which reached solubility-limited concentrations that were orders of magnitude below those necessary to meet the NRC 10 CFR 60.113 release limits for any realistic water flux predicted for the Yucca Mountain repository site. The second group is nuclides of soluble elements such as Cs, Tc, and I, for which release rates do not appear to be solubility-limited and may depend on the dissolution rate of fuel. In later test cycles, {sup 137}Cs, {sup 90}Sr, {sup 99}Tc, and {sup 129}I were continuously released at rates between about 5 {times} 10{sup {minus}5} and 1 {times} 10{sup {minus}4} of inventory per year. The third group is radionuclides that may be transported in the vapor phase, of which {sup 14}C is of primary concern. Detailed test results are presented and discussed. 17 refs., 15 figs., 21 tabs.

Wilson, C.N.

1990-09-01T23:59:59.000Z

408

RESULTS OF CESIUM MASS TRANSFER TESTING FOR NEXT GENERATION SOLVENT WITH HANFORD WASTE SIMULANT AP-101  

SciTech Connect (OSTI)

SRNL has performed an Extraction, Scrub, Strip (ESS) test using the next generation solvent and AP-101 Hanford Waste simulant. The results indicate that the next generation solvent (MG solvent) has adequate extraction behavior even in the face of a massive excess of potassium. The stripping results indicate poorer behavior, but this may be due to inadequate method detection limits. SRNL recommends further testing using hot tank waste or spiked simulant to provide for better detection limits. Furthermore, strong consideration should be given to performing an actual waste, or spiked waste demonstration using the 2cm contactor bank. The Savannah River Site currently utilizes a solvent extraction technology to selectively remove cesium from tank waste at the Multi-Component Solvent Extraction unit (MCU). This solvent consists of four components: the extractant - BoBCalixC6, a modifier - Cs-7B, a suppressor - trioctylamine, and a diluent, Isopar L{trademark}. This solvent has been used to successfully decontaminate over 2 million gallons of tank waste. However, recent work at Oak Ridge National Laboratory (ORNL), Argonne National Laboratory (ANL), and Savannah River National Laboratory (SRNL) has provided a basis to implement an improved solvent blend. This new solvent blend - referred to as Next Generation Solvent (NGS) - is similar to the current solvent, and also contains four components: the extractant - MAXCalix, a modifier - Cs-7B, a suppressor - LIX-79{trademark} guanidine, and a diluent, Isopar L{trademark}. Testing to date has shown that this 'Next Generation' solvent promises to provide far superior cesium removal efficiencies, and furthermore, is theorized to perform adequately even in waste with high potassium concentrations such that it could be used for processing Hanford wastes. SRNL has performed a cesium mass transfer test in to confirm this behavior, using a simulant designed to simulate Hanford AP-101 waste.

Peters, T.; Washington, A.; Fink, S.

2011-09-27T23:59:59.000Z

409

Conventional vs Electric Commercial Vehicle Fleets 1 Paper published in the Proceedings of "The Seventh International Conference on City Logistics"  

E-Print Network [OSTI]

and lower per-mile operating and maintenance costs. However, the initial purchase cost of electric vehicles operating and maintenance costs of electric vehicles and their high initial capital costs. In this paper. Given the high capital costs associated with vehicle fleets, if fleet owners were to replace

Bertini, Robert L.

410

DYNAMIC RIDE-SHARING AND OPTIMAL FLEET SIZING FOR A SYSTEM OF1 SHARED AUTONOMOUS VEHICLES2  

E-Print Network [OSTI]

DYNAMIC RIDE-SHARING AND OPTIMAL FLEET SIZING FOR A SYSTEM OF1 SHARED AUTONOMOUS VEHICLES2 3 4 and for publication in Transportation21 22 23 ABSTRACT24 25 Shared autonomous (fully-automated) vehicles (SAVs, destinations and departure times in the same vehicle), optimizing fleet sizing, and32 anticipating

Kockelman, Kara M.

411

LLNL heart valve condition classification project anechoic testing results at the TRANSDEC evaluation facility  

SciTech Connect (OSTI)

This report first briefly outlines the procedures and support/activation fixture developed at LLNL to perform the heart valve tests in an anechoic-like tank at the US Navy Transducer Evaluation Facility (TransDec) located in San Diego, CA. Next they discuss the basic experiments performed and the corresponding experimental plan employed to gather meaningful data systematically. The signal processing required to extract the desired information is briefly developed along with some of the data. Finally, they show the results of the individual runs for each valve, point out any of the meaningful features and summaries.

Candy, J V

1999-10-31T23:59:59.000Z

412

Charpy impact test results for low activation ferritic alloys irradiated to 30 dpa  

SciTech Connect (OSTI)

Miniature specimens of six low activation ferritic alloys have been impact field tested following irradiation at 370{degrees}C to 30 dpa. Comparison of the results with those of control specimens and specimens irradiated to 10 dpa indicates that degradation in the impact behavior appears to have saturated by {approx}10 dpa in at least four of these alloys. The 7.5Cr-2W alloy referred to as GA3X appears most promising for further consideration as a candidate structural material in fusion reactor applications, although the 9Cr-1V alloy may also warrant further investigation.

Schubert, L.E.; Hamilton, M.L.; Gelles, D.S. [Pacific Northwest National Laboratory, Richland, WA (United States)

1996-04-01T23:59:59.000Z

413

Overview of Recent Results of the Solar Two Test and Evaluations Program  

SciTech Connect (OSTI)

The Solar Two project is a collaborative, cost-shared project between eleven US industry and utility partners and the U.S. Department of Energy to validate the molten-salt power tower technology. The Solar Two plant, located east of Barstow, CA, comprises 1926 heliostats, a receiver, a thermal storage system and a steam generator system that use molten nitrate salt as the heat transfer fluid and storage media. The steam generator powers a 10 MWe, conventional Rankine cycle turbine. This paper describes the test plan and evaluations currently in progress at Solar Two and provides some recent results.

Gilbert, R.; Pacheco, J.E.

1999-01-14T23:59:59.000Z

414

RECENT TEST RESULTS OF THE FAST-PULSED 4 T COS DIPOLE GSI 001.  

SciTech Connect (OSTI)

For the FAIR-project at GSI a model dipole was built at BNL with the nominal field of 4 T and a nominal ramp rate of 1 T/S. The magnet design was similar to the RHIC dipole, with some changes for loss reduction and better cooling. The magnet was already successfully tested in a vertical cryostat, with good training behavior. Cryogenic losses were measured and first results of field harmonics were published. However, for a better understanding of the cooling process, quench currents at several ramp rates were investigated. Detailed measurements of the field harmonics at 2 T/S between 0 and 4 T were performed.

MORITZ, G.; KAUGERTS, J.; ESCALLIER, J.; GANETIS, G.; JAIN, A.; MARONE, A.; MURATORE, J.; THOMAS, R.; WANDERER, P.; ET AL.

2005-05-26T23:59:59.000Z

415

Results from a beam test of silicon strip sensors manufactured by Infineon Technologies AG  

E-Print Network [OSTI]

Most modern particle physics experiments use silicon based sensors for their tracking systems. These sensors are able to detect particles generated in high energy collisions with high spatial resolution and therefore allow the precise reconstruction of particle tracks. So far only a few vendors were capable of producing silicon strip sensors with the quality needed in particle physics experiments. Together with the European-based semiconductor manufacturer Infineon Technologies AG (Infineon) the Institute of High Energy Physics of the Austrian Academy of Sciences (HEPHY) developed planar silicon strip sensors in p-on-n technology. This work presents the first results from a beam test of strip sensors manufactured by Infineon.

Dragicevic, M; Bartl, U; Bergauer, T; Gamerith, S; Hacker, J; König, A; Kröner, F; Kucher, E; Moser, J; Neidhart, T; Schulze, H-J; Schustereder, W; Treberspurg, W; Wübben, T

2014-01-01T23:59:59.000Z

416

TEST RESULTS OF HTS COILS AND AN R AND D MAGNET FOR RIA.  

SciTech Connect (OSTI)

This paper presents the successful construction and test results of a magnetic mirror model for the Rare Isotope Accelerator (RIA) that is based on High Temperature Superconductors (HTS). In addition, the performance of thirteen coils (each made with {approx}220 meters of commercially available HTS tape) is also presented. The proposed HTS magnet is a crucial part of the R&D for the Fragment Separator region where the magnets are subjected to several orders of magnitude more radiation and energy deposition than typical beam line and accelerator magnets receive during their entire lifetime. A preliminary design of an HTS dipole magnet for the Fragment Separator region is also presented.

GUPTA, R.; ANERELLA, M.; HARRISON, M.; SCHMALZLE, J.; SAMPSON, W.; ZELLER, A.

2005-05-16T23:59:59.000Z

417

Test Beam Results of 3D Silicon Pixel Sensors for the ATLAS upgrade  

SciTech Connect (OSTI)

Results on beam tests of 3D silicon pixel sensors aimed at the ATLAS Insertable-B-Layer and High Luminosity LHC (HL-LHC) upgrades are presented. Measurements include charge collection, tracking efficiency and charge sharing between pixel cells, as a function of track incident angle, and were performed with and without a 1.6 T magnetic field oriented as the ATLAS Inner Detector solenoid field. Sensors were bump bonded to the front-end chip currently used in the ATLAS pixel detector. Full 3D sensors, with electrodes penetrating through the entire wafer thickness and active edge, and double-sided 3D sensors with partially overlapping bias and read-out electrodes were tested and showed comparable performance. Full and partial 3D pixel detectors have been tested, with and without a 1.6T magnetic field, in high energy pion beams at the CERN SPS North Area in 2009. Sensors characteristics have been measured as a function of the beam incident angle and compared to a regular planar pixel device. Overall full and partial 3D devices have similar behavior. Magnetic field has no sizeable effect on 3D performances. Due to electrode inefficiency 3D devices exhibit some loss of tracking efficiency for normal incident tracks but recover full efficiency with tilted tracks. As expected due to the electric field configuration 3D sensors have little charge sharing between cells.

Grenier, P.; /SLAC; Alimonti, G.; /INFN, Milan; Barbero, M.; /Bonn U.; Bates, R.; /Glasgow U.; Bolle, E.; /Oslo U.; Borri, M.; /Manchester U.; Boscardin, M.; /Fond. Bruno Kessler, Povo; Buttar, C.; /Glasgow U.; Capua, M.; /Calabria U. /INFN, Cosenza; Cavalli-Sforza, M.; /Barcelona, IFAE; Cobal, M.; /Udine U. /INFN, Udine; Cristofoli, A.; /Udine U. /INFN, Udine; Dalla Betta, G.F.; /Trento U. /INFN, Trento; Darbo, G.; /INFN, Genoa; Da Via, C.; /Manchester U.; Devetak, E.; /SUNY, Stony Brook; DeWilde, B.; /SUNY, Stony Brook; Di Girolamo, B.; /CERN; Dobos, D.; /CERN; Einsweiler, K.; /LBL, Berkeley; Esseni, D.; /Udine U. /INFN, Udine /Calabria U. /INFN, Cosenza /Barcelona, Inst. Microelectron. /Manchester U. /CERN /LBL, Berkeley /INFN, Genoa /INFN, Genoa /Udine U. /INFN, Udine /Oslo U. /ICREA, Barcelona /Barcelona, IFAE /SINTEF, Oslo /SINTEF, Oslo /SLAC /SLAC /Bergen U. /New Mexico U. /Bonn U. /SLAC /Freiburg U. /VTT Electronics, Espoo /Bonn U. /SLAC /Freiburg U. /SLAC /SINTEF, Oslo /Manchester U. /Barcelona, IFAE /Bonn U. /Bonn U. /CERN /Manchester U. /SINTEF, Oslo /Barcelona, Inst. Microelectron. /Calabria U. /INFN, Cosenza /Udine U. /INFN, Udine /Manchester U. /VTT Electronics, Espoo /Glasgow U. /Barcelona, IFAE /Udine U. /INFN, Udine /Hawaii U. /Freiburg U. /Manchester U. /Barcelona, Inst. Microelectron. /CERN /Fond. Bruno Kessler, Povo /Prague, Tech. U. /Trento U. /INFN, Trento /CERN /Oslo U. /Fond. Bruno Kessler, Povo /INFN, Genoa /INFN, Genoa /Bergen U. /New Mexico U. /Udine U. /INFN, Udine /SLAC /Oslo U. /Prague, Tech. U. /Oslo U. /Bergen U. /SUNY, Stony Brook /SLAC /Calabria U. /INFN, Cosenza /Manchester U. /Bonn U. /SUNY, Stony Brook /Manchester U. /Bonn U. /SLAC /Fond. Bruno Kessler, Povo

2011-08-19T23:59:59.000Z

418

Test Results of a Nb3Sn Wind/React 'Stress-Managed' BlockDipole  

SciTech Connect (OSTI)

A second phase of a highfield dipole technology developmenthas been tested. A Nb3Sn block-coil model dipole was fabricated, usingmagnetic mirror geometry and wind/react coil technology. The primaryobjective of this phase was to make a first experimental test of thestress-management strategy pioneered at Texas A&M. In this strategy ahigh-strength support matrix is integrated with the windings to interceptLorentz stress from the inner winding so that it does not accumulate inthe outer winding. The magnet attained a field that was consistent withshort sample limit on the first quench; there was no training. Thedecoupling of Lorentz stress between inner and outer windings wasvalidated. In ramp rate studies the magnet exhibited a remarkablerobustness in rapid ramping operation. It reached 85 percent of shortsample(ss) current even while ramping 2-3 T/s. This robustness isattributed to the orientation of the Rutherford cables parallel to thefield in the windings, instead of the transverse orientation thatcharacterizes common dipole designs. Test results are presented and thenext development phase plans are discussed.

McInturff, A.; Bish, P.; Blackburn, R.; Diaczenko, N.; Elliott,T.; Hafalia Jr., R.; Henchel, W.; Jaisle, A.; Lau, W.; Lietzke, A.; McIntyre, P.; Noyes, P.; Nyman, M.; Sattarov, A.; Sattarov, A.

2006-08-25T23:59:59.000Z

419

Test Results of a Nb3Sn Wind/React"Stress-Managed" Block Dipole  

SciTech Connect (OSTI)

A second phase of a high field dipole technology development has been tested. A Nb{sub 3}Sn block-coil model dipole was fabricated, using magnetic mirror geometry and wind/react coil technology. The primary objective of this phase was to make a first experimental test of the stress-management strategy pioneered at Texas A&M. In this strategy a high-strength support matrix is integrated with the windings to intercept Lorentz stress from the inner winding so that it does not accumulate in the outer winding. The magnet attained a field that was consistent with short sample limit on the first quench; there was no training. The decoupling of Lorentz stress between inner and outer windings was validated. In ramp rate studies the magnet exhibited a remarkable robustness in rapid ramping operation. It reached 85% of short sample(ss) current even while ramping 2-3 T/s. This robustness is attributed to the orientation of the Rutherford cables parallel to the field in the windings, instead of the transverse orientation that characterizes common dipole designs. Test results are presented and the next development phase plans are discussed.

McInturff, A.; Blackburn, R.; Diaczenko, N.; Elliott, T.; Henchel, W.; Jaisle, A.; McIntyre, P.; Noyes, P.; Sattarov, A.; Lietzke, A.; Hafalia Jr., R.; Lau, W.; Nyman, M.; Bish, P.

2007-06-01T23:59:59.000Z

420

Results from Alloy 600 And Alloy 690 Caustic SCC Model Boiler Tests  

SciTech Connect (OSTI)

A versatile model boiler test methodology was developed and used to compare caustic stress corrosion cracking (SCC) of mill annealed Alloy 600 and thermally treated Alloy 690. The model boiler included simulated crevice devices that efficiently and consistently concentrated Na2CO3, resulting in volatilization of CO2 with the steam and concentration of NaOH at the tube surfaces. The test methodology also included variation in tube stress, either produced by the primary to secondary side pressure differential, or by a novel method that reproducibly yields a higher stress condition on the tube. The significant effect of residual stress on tube SCC was also considered. SCC of both Alloy 600 and Alloy 690 were evaluated as a function of temperature and stress. Analytical transmission electron microscopy (ATEM) evaluations of the cracks and the grain boundaries ahead of the cracks were performed, providing insight into the SCC mechanism. This model boiler test methodology may be applicable to a range of bulkwater secondary chemistries that concentrate to produce aggressive crevice environments.

Miller, Frederick D.; Thomas, Larry E.

2009-08-03T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Simulation of natural corrosion by vapor hydration test: seven-year results  

SciTech Connect (OSTI)

We have investigated the alteration behavior of synthetic basalt and SRL 165 borosilicate waste glasses that had been reacted in water vapor at 70 {degrees}C for time periods up to seven years. The nature and extent of corrosion of glasses have been determined by characterizing the reacted glass surface with optical microscopy, scanning electron microscopy (SEM), transmission electron microscopy (TEM), and energy dispersive x-ray spectroscopy (EDS). Alteration in 70 {degrees}C laboratory tests was compared to that which occurs at 150-200 {degrees}C and also with Hawaiian basaltic glasses of 480 to 750 year old subaerially altered in nature. Synthetic basalt and waste glasses, both containing about 50 percent wt SiO{sub 2} were found to react with water vapor to form an amorphous hydrated gel that contained small amounts of clay, nearly identical to palagonite layers formed on naturally altered basaltic glass. This result implies that the corrosion reaction in nature can be simulated with a vapor hydration test. These tests also provide a means for measuring the corrosion kinetics, which are difficult to determine by studying natural samples because alteration layers have often spelled off the samples and we have only limited knowledge of the conditions under which alteration occurred.

Luo, J.S.; Ebert, W.L.; Mazer, J.J.; Bates, J.K.

1996-12-31T23:59:59.000Z

422

Sample Results From The Extraction, Scrub, And Strip Test For The Blended NGS Solvent  

SciTech Connect (OSTI)

This report summarizes the results of the extraction, scrub, and strip testing for the September 2013 sampling of the Next Generation Solvent (NGS) Blended solvent from the Modular Caustic Side-Solvent Extraction Unit (MCU) Solvent Hold Tank. MCU is in the process of transitioning from the BOBCalixC6 solvent to the NGS Blend solvent. As part of that transition, MCU has intentionally created a blended solvent to be processed using the Salt Batch program. This sample represents the first sample received from that blended solvent. There were two ESS tests performed where NGS blended solvent performance was assessed using either the Tank 21 material utilized in the Salt Batch 7 analyses or a simulant waste material used in the V-5/V-10 contactor testing. This report tabulates the temperature corrected cesium distribution, or DCs values, step recovery percentage, and actual temperatures recorded during the experiment. This report also identifies the sample receipt date, preparation method, and analysis performed in the accumulation of the listed values. The calculated extraction DCs values using the Tank 21H material and simulant are 59.4 and 53.8, respectively. The DCs values for two scrub and three strip processes for the Tank 21 material are 4.58, 2.91, 0.00184, 0.0252, and 0.00575, respectively. The D-values for two scrub and three strip processes for the simulant are 3.47, 2.18, 0.00468, 0.00057, and 0.00572, respectively. These values are similar to previous measurements of Salt Batch 7 feed with lab-prepared blended solvent. These numbers are considered compatible to allow simulant testing to be completed in place of actual waste due to the limited availability of feed material.

Washington, A. L. II; Peters, T. B.

2014-03-03T23:59:59.000Z

423

Results of injection and tracer tests in Olkaria East Geothermal Field  

SciTech Connect (OSTI)

This paper presents results of a six month Injection and Tracer test done in Olkaria East Geothermal Field The Injection tests show that commencement of injection prior to onset of large drawdown in the reservoir leads to greater sustenance of well production and can reduce well cycling which is a common feature of wells in Olkaria East Field. For cases where injection is started after some drawdown has occurred in the reservoir, injection while leading to improvement of well output can also lead to increase in well cycling which is a non desirable side effect. Tracer tests reveal slow rate of fluid migration (< 5 m/hr). However estimates of the cumulative tracer returns over the period of injection is at least 31% which is large and reveals the danger of late time thermal drawdown and possible loss of production. It is shown in the discussion that the two sets of results are consistent with a reservoir where high permeability occurs along contact surfaces which act as horizontal "fractures" while the formations between the "fractures" have low permeability. This type of fracture system will lead to channeled flow of injected fluid and therefore greater thermal depletion along the fractures while formations further from the fracture would still be at higher temperature. In an attempt to try and achieve a more uniform thermal depletion in the reservoir, it is proposed that continuous injection be done for short periods (~2 years) and this be followed by recovery periods of the nearly the same length of time before resumption of injection again.

Ambusso, Willis J.

1994-01-20T23:59:59.000Z

424

Characterization and Dessolution Test results for the January 2005 DWPF Off Gas Condensate Tank Samples (U)  

SciTech Connect (OSTI)

The Off Gas Condensate Tank (OGCT) at the Defense Waste Processing Facility (DWPF) collects the condensate from the off-gas system of the melter. The condensate stream contains entrained solids that collect in the OGCT. Water from the OGCT is re-circulated to the Steam Atomized Scrubber and quencher and may provide a mechanism for re-introducing the particulates into the off-gas system. These particulates are thought to be responsible for plugging the downstream High Efficiency Mist Eliminator filters. Therefore, the OGCT needs to be periodically cleaned to remove the build-up of entrained solids. Currently, the OGCT is cleaned by adding nominally 12 wt% nitric acid with agitation to slurry the solids from the tank. Samples from the OGCT were sent to the Savannah River National Lab (SRNL) for characterization and to conduct tests to determine the optimum nitric acid concentration and residence time to allow more effective cleaning of the OGCT. This report summarizes the chemical and radionuclide results and the results from the nitric acid dissolution testing at 50% and 12% obtained for the OGCT sample.

Fellinger, T

2005-04-08T23:59:59.000Z

425

MESERAN Test Results for Elimination of Flammable Solvents in Wipe Applications at Pantex  

SciTech Connect (OSTI)

In recent years, efforts have been made within the nuclear weapons complex (National Nuclear Security Administration) of the Department of Energy (DOE) to replace Resource Conservation and Recovery Act (RCRA) regulated solvents (i.e., flammable, toxic, corrosive, and reactive) and ozone-depleting chemicals (ODC) with more benign alternatives. Within the National Nuclear Security Administration (NNSA) and the Department of Defense (DoD) sectors, these solvents are used for cleaning hardware during routine maintenance operations. A primary goal of this study is to replace flammable solvents for wiping applications. Two cleaners, including a hydrofluoroether (HFE) and an azeotrope of the HFE and isopropyl alcohol (IPA), have been studied as potential replacements for flammable solvents. Cleaning efficacy, short-term and longterm materials compatibility, corrosion, drying times, flammability, environment, safety and health (ES&H) issues and accelerated aging studies are among the tests that are being conducted and that are used to screen candidate solvents by the interagency team performing this work. The results are compared to the traditionally used isopropyl alcohol, which serves as the baseline cleaner. This report details the results of MESERAN (Measurement and Evaluation of Surfaces by Evaporative Rate ANalysis) testing performed at the Kansas City Plant (KCP) to quantify the cleaning efficacy on samples contaminated with the various contaminants and cleaned by wiping with the various solvents being evaluated.

M. G. Benkovich

2005-03-30T23:59:59.000Z

426

The Ring Imaging Cherenkov detector of the AMS experiment: test beam results with a prototype  

E-Print Network [OSTI]

The Alpha Magnetic Spectrometer (AMS) to be installed on the International Space Station (ISS) will be equipped with a proximity Ring Imaging Cherenkov (RICH) detector for measuring the velocity and electric charge of the charged cosmic particles. This detector will contribute to the high level of redundancy required for AMS as well as to the rejection of albedo particles. Charge separation up to iron and a velocity resolution of the order of 0.1% for singly charged particles are expected. A RICH protoptype consisting of a detection matrix with 96 photomultiplier units, a segment of a conical mirror and samples of the radiator materials was built and its performance was evaluated. Results from the last test beam performed with ion fragments resulting from the collision of a 158 GeV/c/nucleon primary beam of indium ions (CERN SPS) on a lead target are reported. The large amount of collected data allowed to test and characterize different aerogel samples and the sodium fluoride radiator. In addition, the reflec...

Arruda, Luísa; Goncalves, Patrícia; Pereira, Rui

2008-01-01T23:59:59.000Z

427

The Ring Imaging Cherenkov detector of the AMS experiment: test beam results with a prototype  

E-Print Network [OSTI]

The Alpha Magnetic Spectrometer (AMS) to be installed on the International Space Station (ISS) will be equipped with a proximity Ring Imaging Cherenkov (RICH) detector for measuring the velocity and electric charge of the charged cosmic particles. This detector will contribute to the high level of redundancy required for AMS as well as to the rejection of albedo particles. Charge separation up to iron and a velocity resolution of the order of 0.1% for singly charged particles are expected. A RICH protoptype consisting of a detection matrix with 96 photomultiplier units, a segment of a conical mirror and samples of the radiator materials was built and its performance was evaluated. Results from the last test beam performed with ion fragments resulting from the collision of a 158 GeV/c/nucleon primary beam of indium ions (CERN SPS) on a lead target are reported. The large amount of collected data allowed to test and characterize different aerogel samples and the sodium fluoride radiator. In addition, the reflectivity of the mirror was evaluated. The data analysis confirms the design goals.

Luísa Arruda; Fernando Barão; Patrícia Goncalves; Rui Pereira

2008-01-29T23:59:59.000Z

428

Alternative fuels for vehicles fleet demonstration program final report. Volume 1: Summary  

SciTech Connect (OSTI)

The Alternative Fuels for Vehicles Fleet Demonstration Program (AFV-FDP) was a multiyear effort to collect technical data for use in determining the costs and benefits of alternative-fuel vehicles in typical applications in New York State. During 3 years of collecting data, 7.3 million miles of driving were accumulated, 1,003 chassis-dynamometer emissions tests were performed, 862,000 gallons of conventional fuel were saved, and unique information was developed about garage safety recommendations, vehicle performance, and other topics. Findings are organized by vehicle and fuel type. For light-duty compressed natural gas (CNG) vehicles, technology has evolved rapidly and closed-loop, electronically-controlled fuel systems provide performance and emissions advantages over open-loop, mechanical systems. The best CNG technology produces consistently low tailpipe emissions versus gasoline, and can eliminate evaporative emissions. Reduced driving range remains the largest physical drawback. Fuel cost is low ($/Btu) but capital costs are high, indicating that economics are best with vehicles that are used intensively. Propane produces impacts similar to CNG and is less expensive to implement, but fuel cost is higher than gasoline and safety codes limit use in urban areas. Light-duty methanol/ethanol vehicles provide performance and emissions benefits over gasoline with little impact on capital costs, but fuel costs are high. Heavy-duty CNG engines are evolving rapidly and provide large reductions in emissions versus diesel. Capital costs are high for CNG buses and fuel efficiency is reduced, but the fuel is less expensive and overall operating costs are about equal to those of diesel buses. Methanol buses provide performance and emissions benefits versus diesel, but fuel costs are high. Other emerging technologies were also evaluated, including electric vehicles, hybrid-electric vehicles, and fuel cells.

NONE

1997-03-01T23:59:59.000Z

429

E-Print Network 3.0 - atomic weapon tests Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

By dissembling random nuclear weapons in the stockpile and closely inspecting and testing... explosives and nuclear materials at the Nevada Test Site to gather diagnostic...

430

E-Print Network 3.0 - acceptance test limit Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Information Sciences 16 Power-Aware Test Planning in the Early System-on-Chip Design Exploration Process Summary: limitations. Concurrent scheduling of tests is used to...

431

E-Print Network 3.0 - astm test method Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Biodiesel Standards and Testing Methods Alternative Fuels Consortium... Biodiesel production review Key elements in ASTM Specifications and Standard Test Methods ASTM......

432

E-Print Network 3.0 - analogic circuit testes Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Summary: of analog and digital circuits. Subsequently, we shall outline several common test strategies... , and their corresponding test setups for verifying the function...

433

Comparison of the results of short-term static tests and single-pass flow-through tests with LRM glass.  

SciTech Connect (OSTI)

Static dissolution tests were conducted to measure the forward dissolution rate of LRM glass at 70 C and pH(RT) 11.7 {+-} 0.1 for comparison with the rate measured with single-pass flow-through (SPFT) tests in an interlaboratory study (ILS). The static tests were conducted with monolithic specimens having known geometric surface areas, whereas the SPFT tests were conducted with crushed glass that had an uncertain specific surface area. The error in the specific surface area of the crushed glass used in the SPFT tests, which was calculated by modeling the particles as spheres, was assessed based on the difference in the forward dissolution rates measured with the two test methods. Three series of static tests were conducted at 70 C following ASTM standard test method C1220 using specimens with surfaces polished to 600, 800, and 1200 grit and a leachant solution having the same composition as that used in the ILS. Regression of the combined results of the static tests to the affinity-based glass dissolution model gives a forward rate of 1.67 g/(m{sup 2}d). The mean value of the forward rate from the SPFT tests was 1.64 g/(m{sup 2}d) with an extended uncertainty of 1.90 g/(m{sup 2}d). This indicates that the calculated surface area for the crushed glass used in the SPFT tests is less than 2% higher than the actual surface area, which is well within the experimental uncertainties of measuring the forward dissolution rate using each test method. These results indicate that the geometric surface area of crushed glass calculated based on the size of the sieves used to isolate the fraction used in a test is reliable. In addition, the C1220 test method provides a means for measuring the forward dissolution rate of borosilicate glasses that is faster, easier, and more economical than the SPFT test method.

Ebert, W. L.; Chemical Engineering

2007-01-29T23:59:59.000Z

434

Comparison of fission product release predictions using PARFUME with results from the AGR-1 safety tests  

SciTech Connect (OSTI)

Safety tests were conducted on fourteen fuel compacts from AGR-1, the first irradiation experiment of the Advanced Gas Reactor (AGR) Fuel Development and Qualification program, at temperatures ranging from 1600 to 1800°C to determine fission product release at temperatures that bound reactor accident conditions. The PARFUME (PARticle FUel ModEl) code was used to predict the release of fission products silver, cesium, strontium, and krypton from fuel compacts containing tristructural isotropic (TRISO) coated particles during the safety tests, and the predicted values were compared with experimental results. Preliminary comparisons between PARFUME predictions and post-irradiation examination (PIE) results of the safety tests show different trends in the prediction of the fractional release depending on the species, and it leads to different conclusions regarding the diffusivities used in the modeling of fission product transport in TRISO-coated particles: • For silver, the diffusivity in silicon carbide (SiC) might be over-estimated by a factor of at least 102 to 103 at 1600°C and 1700°C, and at least 10 to 102 at 1800°C. The diffusivity of silver in uranium oxy-carbide (UCO) might also be over-estimated, but the available data are insufficient to allow definitive conclusions to be drawn. • For cesium, the diffusivity in UCO might be over-estimated by a factor of at least 102 to 103 at 1600°C, 105 at 1700°C, and 103 at 1800°C. The diffusivity of cesium in SiC might also over-estimated, by a factor of 10 at 1600°C and 103 at 1700°C, based upon the comparisons between calculated and measured release fractions from intact particles. There is no available estimate at 1800°C since all the compacts heated up at 1800°C contain particles with failed SiC layers whose release dominates the release from intact particles. • For strontium, the diffusivity in SiC might be over-estimated by a factor of 10 to 102 at 1600 and 1700°C, and 102 to 103 at 1800°C. These values might be somewhat over-estimated because the strontium retention during irradiation cannot be assessed a priori, which affects the magnitude of the calculated release during safety testing. The diffusivity of strontium in UCO cannot be derived from these heating tests, but it is assumed to be modeled correctly using the IAEA recommended value for kernel diffusivity. • For krypton, there is no reliable release data for compacts heated up at 1600°C, which includes all the compacts containing only intact particles. At 1700 and 1800°C, comparisons show an over-prediction of the release from compacts containing particles with failed SiC by 1 to 1.5 orders of magnitude. The available data from these heating tests do not allow to determine which of the TRISO-coating’s layers diffusivities are under or over-estimated.

Blaise Collin

2014-09-01T23:59:59.000Z

435

Airline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches  

E-Print Network [OSTI]

-based. The preventative alternative involves the transmission of maintenance data to maintenance personnel whenAirline Fleet Maintenance: Trade-off Analysis of Alternate Aircraft Maintenance Approaches Mike Dupuy, Dan Wesely, Cody Jenkins Abstract ­ Airline maintenance is a significant contributor

436

DECREASING THE AGE OF VEHICLE FLEETS: IS IT WORTH IT FROM A SAFETY PERSPECTIVE  

E-Print Network [OSTI]

. Although not staggering the benefit-cost ratio is larger than one considering existing vehicle replacement programs can cost $700 per vehicle. The benefit may be higher in areas with higher proportion of olderDECREASING THE AGE OF VEHICLE FLEETS: IS IT WORTH IT FROM A SAFETY PERSPECTIVE Patrick McGowen, M

McGowen, Patrick

437

Economic costs and environmental impacts of alternative fuel vehicle fleets in local government: An interim assessment  

E-Print Network [OSTI]

Economic costs and environmental impacts of alternative fuel vehicle fleets in local government. This paper examines the cost effectiveness and environmental impact of the conversion of a 180 plus vehicle of Civil and Materials Engineering, and Institute for Environmental Science and Policy, University

Illinois at Chicago, University of

438

Alternative Fuels and Advanced Vehicles: Resources for Fleet Managers (Clean Cities) (Presentation)  

SciTech Connect (OSTI)

A discussion of the tools and resources on the Clean Cities, Alternative Fuels and Advanced Vehicles Data Center, and the FuelEconomy.gov Web sites that can help vehicle fleet managers make informed decisions about implementing strategies to reduce gasoline and diesel fuel use.

Brennan, A.

2011-04-01T23:59:59.000Z

439

Optimal Fleet Management Plan Excerpt from the Vehicle Allocation Methodology (VAM) required by  

E-Print Network [OSTI]

's Alternative Fuels and Advanced Vehicles Data Center: http://www.afdc.energy.gov/afdc/locator/stations/ which by Presidential Memorandum ­ Federal Fleet Performance, 24 May 2011 Alternative Fuel Vehicles (AFV): A) USACE has to AFV fueling stations during vehicle acquisitions beyond 31 DEC 2015; the Transportation Division

US Army Corps of Engineers

440

Geospatial Analysis and Optimization of Fleet Logistics to Exploit Alternative Fuels and Advanced Transportation Technologies: Preprint  

SciTech Connect (OSTI)

This paper describes how the National Renewable Energy Laboratory (NREL) is developing geographical information system (GIS) tools to evaluate alternative fuel availability in relation to garage locations and to perform automated fleet-wide optimization to determine where to deploy alternative fuel and advanced technology vehicles and fueling infrastructure.

Sparks, W.; Singer, M.

2010-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Primary productivity demands of global fishing fleets Reg Watson1,2  

E-Print Network [OSTI]

Primary productivity demands of global fishing fleets Reg Watson1,2 , Dirk Zeller1 & Daniel Pauly1 production driven by solar energy. Primary production required (PPR) esti- mates how much primary production. Pauly. 2013. Primary productivity demands of global fisheries. Fish and Fisheries. #12;Introduction

Pauly, Daniel

442

The University of Texas at Austin Energy Savings Program for Fleet  

E-Print Network [OSTI]

. With the continued increase in the price of fuel, it is imperative that the University develop and implement miles projected to grow about one percent per year, dependence on foreign oil will continue to rise of new technologies for fuel efficiency by reducing the age of the fleet. Implement an optimum life cycle

Yang, Zong-Liang

443

A MODEL FOR THE FLEET SIZING OF DEMAND RESPONSIVE TRANSPORTATION SERVICES WITH TIME WINDOWS  

E-Print Network [OSTI]

A MODEL FOR THE FLEET SIZING OF DEMAND RESPONSIVE TRANSPORTATION SERVICES WITH TIME WINDOWS Marco a demand responsive transit service with a predetermined quality for the user in terms of waiting time models; Continuous approximation models; Paratransit services; Demand responsive transit systems. #12;3 1

Dessouky, Maged

444

Alternative fuels for vehicles fleet demonstration program. Final report, volume 2: Appendices  

SciTech Connect (OSTI)

The Alternative Fuels for Vehicles Fleet Demonstration Program (AFV-FDP) was a multiyear effort to collect technical data for use in determining the costs and benefits of alternative-fuel vehicles (AFVs) in typical applications in New York State. This report, Volume 2, includes 13 appendices to Volume 1 that expand upon issues raised therein. Volume 1 provides: (1) Information about the purpose and scope of the AFV-FDP; (2) A summary of AFV-FDP findings organized on the basis of vehicle type and fuel type; (3) A short review of the status of AFV technology development, including examples of companies in the State that are active in developing AFVs and AFV components; and (4) A brief overview of the status of AFV deployment in the State. Volume 3 provides expanded reporting of AFV-FDP technical details, including the complete texts of the brochure Garage Guidelines for Alternative Fuels and the technical report Fleet Experience Survey Report, plus an extensive glossary of AFV terminology. The appendices cover a wide range of issues including: emissions regulations in New York State; production and health effects of ozone; vehicle emissions and control systems; emissions from heavy-duty engines; reformulated gasoline; greenhouse gases; production and characteristics of alternative fuels; the Energy Policy Act of 1992; the Clean Fuel Fleet Program; garage design guidelines for alternative fuels; surveys of fleet managers using alternative fuels; taxes on conventional and alternative fuels; and zero-emission vehicle technology.

NONE

1997-06-01T23:59:59.000Z

445

fishing fleets were allegedly hampering their mackerel-fishing operations. Pa-  

E-Print Network [OSTI]

fishing fleets were allegedly hampering their mackerel-fishing operations. Pa- trols by fishery of the EEZ, d)jurisdiction over the preser- vation of the marine environment (in- cluding control Olicia/ de /a Fedemcion . At a joint press conference following the signing of the Presidential message

446

Assessment of Inlet Cooling to Enhance Output of a Fleet of Gas Turbines  

E-Print Network [OSTI]

An analysis was made to assess the potential enhancement of a fleet of 14 small gas turbines' power output by employing an inlet air cooling scheme at a gas process plant. Various gas turbine (GT) inlet air cooling schemes were reviewed. The inlet...

Wang, T.; Braquet, L.

2008-01-01T23:59:59.000Z

447

Visual Mining and Statistics for a Turbofan Engine Fleet Jrme Lacaille  

E-Print Network [OSTI]

1 Visual Mining and Statistics for a Turbofan Engine Fleet Jérôme Lacaille Snecma Etablissement de of engines. Every day, data from aircraft engines are broadcasted to the ground. Some airlines companies rely on their engine manufacturer to control the engines' behavior and help prepare for maintenance scheduling

Paris-Sud XI, Université de

448

Evaluation of Flygt Mixers for Application in Savannah River Site Tank 19 Test Results from Phase B: Mid-Scale Testing at PNNL  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) performed mixer tests using 3-kW (4-hp) Flygt mixers in 1.8- and 5.7-m-diameter tanks at the 336 building facility in Richland, Washington to evaluate candidate scaling relationships for Flygt mixers used for sludge mobilization and particle suspension. These tests constituted the second phase of a three-phase test program involving representatives from ITT Flygt Corporation, the Savannah River Site (SRS), the Oak Ridge National Laboratory (ORNL), and PNNL. The results of the first phase of tests, which were conducted at ITT Flygt's facility in a 0.45-m-diameter tank, are documented in Powell et al. (1999). Although some of the Phase B tests were geometrically similar to selected Phase A tests (0.45-m tank), none of the Phase B tests were geometrically, cinematically, and/or dynamically similar to the planned Tank 19 mixing system. Therefore, the mixing observed during the Phase B tests is not directly indicative of the mixing expected in Tank 19 and some extrapolation of the data is required to make predictions for Tank 19 mixing. Of particular concern is the size of the mixer propellers used for the 5.7-m tank tests. These propellers were more than three times larger than required by geometric scaling of the Tank 19 mixers. The implications of the lack of geometric similarity, as well as other factors that complicate interpretation of the test results, are discussed in Section 5.4.

Powell, M.R.; Combs, W.H.; Farmer, J.R.; Gladki, H.; Hatchell, B.K.; Johnson, M.A.; Poirier, M.R.; Rodwell, P.O.

1999-03-30T23:59:59.000Z

449

Results of injection and tracer tests in Olkaria north east field in Kenya  

SciTech Connect (OSTI)

Tracer and injection tests were performed in the Olkaria North East Field with the objective to reduce uncertainty in the engineering design and to determine the suitability of well OW-704 as a re-injection well for the waste brine from the steam field during production. An organic dye (sodium fluorescein) was injected into well OW-704 as a slug. The tracer returns were observed in well OW-M2 which is 580 m deep, 620 m from well OW-704 and well OW-716 which is 900 m from well OW-704. The other wells on discharge, OW-714, and OW-725 did not show any tracer returns. However, other chemical constituents suggested., that well OW-716 experienced a chemical breakthrough earlier than OW-M2. Tracer return velocities of 0.31 m/hr and 1.3 m/hr were observed. Results of the tracer and injection tests indicate that OW-704 may be used as a re-injection well provided a close monitoring program is put in place.

Karingithi, C.W. [Kenya Power Company Ltd., Naivasha (Kenya)

1995-12-31T23:59:59.000Z

450

Prototype Test Results of the Solar Tower Atmospheric Cherenkov Effect Experiment (STACEE)  

E-Print Network [OSTI]

There are currently no experiments, either satellite or ground-based, that are sensitive to astrophysical gamma-rays at energies between 20 and 250 GeV. We are developing the Solar Tower Atmospheric Cherenkov Effect Experiment (STACEE) to explore this energy range. STACEE will use heliostat mirrors at a solar research facility to collect Cherenkov light from extensive air showers produced by high energy gamma-rays. Here we report on the results of prototype test work at the solar facility of Sandia National Laboratories (Albuquerque, NM). The work demonstrates that the facility is suitable for use as an astrophysical observatory. In addition, using a full scale prototype of part of STACEE, we detected atmospheric Cherenkov radiation at energies lower than any other ground-based experiment to date.

STACEE Collaboration

1997-04-03T23:59:59.000Z

451

First Results of the Testing of the Liquid Gallium Jet Limiter Concept for ISTTOK  

SciTech Connect (OSTI)

The use of liquid metals as plasma facing components in tokamaks has recently experienced a renewed interest stimulated by their advantages to the development of a fusion reactor. Liquid metals have been proposed to solve problems related to the erosion and neutronic activation of solid walls submitted to high power loads allowing an efficient heat exhaustion from fusion devices. Presently the most promising materials are Lithium and Gallium. ISTTOK, a small size tokamak, will be used to test the behavior of a liquid Gallium jet in the vacuum chamber and its influence on the plasma. This paper presents a description of the conceived setup as well as experimental results. The liquid Gallium jet is generated by hydrostatic pressure and injected in a radial position close to a moveable stainless steel limiter. Both the jet and the limiter positions are variable allowing for a controlled exposure of the liquid Gallium to the edge plasma. The main components of the Gallium loop are a MHD pump, the liquid metal injector and a filtering system. The MHD pump is of the induction type, based on rotating permanent magnets. The injector is build from a stainless steel pipe ended by a shaping nozzle. A setup has been developed to introduce oxide-free Gallium inside the loop's main supply tank. Raw liquid metal is placed inside a chamber heated and degassed under high vacuum while clean Gallium is extracted from the main body of the liquefied metal. Prior to installation on the tokamak, the experimental rig has been implemented using a Pyrex tube as test chamber to investigate the stability of the Gallium jet and its break-up length for several nozzle sizes. Results are presented in this paper. This rig was also useful to assess the behavior of the overall implemented apparatus.

Gomes, R. B.; Fernandes, H.; Silva, C.; Borba, D.; Carvalho, B.; Varandas, C. [Associacao EURATOM/IST, Centro de FuSao Nuclear, Av. Rovisco Pais, 1049-001 Lisbon (Portugal); Lielausis, O.; Klyukin, A.; Platacis, E.; Mikelsons, A.; Platnieks, I. [Association EURATOM/University of Latvia, Institute of Physics, 32 Miera Str., Salaspils, LV-2169 (Latvia)

2006-12-04T23:59:59.000Z

452

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.3 Check Upload Integrity  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.3 Check Upload Integrity Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.1.3 Check Upload Integrity

Colorado at Boulder, University of

453

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.3 Check Upload Integrity  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.3 Check Upload Integrity Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.1.3 Check Upload Integrity

Colorado at Boulder, University of

454

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.2 Download Data Timing  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.2 Download Data Timing Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.5.2.2 Download Data Timing

Colorado at Boulder, University of

455

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.1a Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.1a Watchdog Date: February 13, 2001 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement-0049 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

456

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.2a Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.2a Watchdog Date: February 13, 2001 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.09 Component Test Results Requirement-0019 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

457

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.2 Download Data Timing  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.2 Download Data Timing Date. Brownsberger 2-13-01 The Center for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1 Initial Release COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.5.2.2 Download Data Timing

Colorado at Boulder, University of

458

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.1b Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.1b Watchdog Date: February 13, 2001 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.09 Component Test Results Requirement-0018 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

459

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.1a Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.09 Component Test Results Requirement 5.1.2.1a Watchdog Date: February 13, 2001 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.09 Component Test Results Requirement-0017 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

460

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.1b Watchdog  

E-Print Network [OSTI]

COS DCE BOOT FSW v1.13 Component Test Results Requirement 5.1.2.1b Watchdog Date: February 13, 2001 for Astrophysics and Space Astronomy Reviewed: Approved: COS DCE BOOT FSW v1.13 Component Test Results Requirement-0050 February 13, 2001 Center for Astrophysics & Space Astronomy Initial Release COS DCE BOOT FSW v1

Colorado at Boulder, University of

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Ponding Test Results Seepage and Total Losses, North Alamo Main Canal Hidalgo County Irrigation District No. 2  

E-Print Network [OSTI]

TR-324 2008 Ponding Test Results Seepage and Total Losses, North Alamo Main Canal Hidalgo County Irrigation District No. 2 Eric Leigh Texas AgriLife Extension Associate, Biological and Agricultural... Engineering, College Station Guy Fipps Texas AgriLife Extension Professor and Extension Agricultural Engineer, Biological and Agricultural Engineering, College Station February 4, 2004 PONDING TEST RESULTS SEEPAGE AND TOTAL...

Leigh, E.; Fipps, G.

462

Ponding Test Results Seepage and Total Losses, Secondary Canals 13, 16, and 29 Donna Irrigation District Hidalgo County No. 1  

E-Print Network [OSTI]

TR-323 2008 Ponding Test Results Seepage and Total Losses, Secondary Canals 13, 16, and 29 Donna Irrigation District Hidalgo County No. 1 Eric Leigh Texas AgriLife Extension Associate, Biological... and Agricultural Engineering, College Station Guy Fipps Texas AgriLife Extension Professor and Extension Agricultural Engineer, Biological and Agricultural Engineering, College Station March 30, 2004 PONDING TEST RESULTS SEEPAGE...

Leigh, E.; Fipps, G.

463

E-Print Network 3.0 - architecture test bed Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

as an advance... test-bed generator, MaramaMTE 6, for use in the domain of service-oriented architecture performance... and performance test-beds to be generated - again both...

464

E-Print Network 3.0 - acceptance tests Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Information Sciences 90 Power-Aware Test Planning in the Early System-on-Chip Design Exploration Process Summary: Power-Aware Test Planning in the Early System-on-Chip Design...

465

E-Print Network 3.0 - air inleakage test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

air inleakage test Page: << < 1 2 3 4 5 > >> 1 INFORMAL REPORT MULTI-TRACER CONTROL ROOM AIR INLEAKAGE PROTOCOL Summary: testings to quantify the magnitude and uncertainties of air...

466

Side-by-Side Testing of Water Heating Systems: Results from the 2009-2010 Evaluation  

Broader source: Energy.gov [DOE]

The performance of seven differing types of residential water heating systems was compared in a side-by-side test configuration over a full year period. The Hot Water System Laboratory (HWS Lab) test facility at the Florida Solar Energy Center (FSEC) in Cocoa, FL was used for the tests.

467

Construction and early test results of waste transport in piping systems served by ULF water closets  

E-Print Network [OSTI]

The intent of this study was to determine if there is a correlation between discharge curves and venting on waste transport. Test stands were built to facilitate discharge curve and waste transport testing at the ESL Laboratory of Texas A&M. Tests...

Carrier, Jonathan Gerald

2003-01-01T23:59:59.000Z

468

Test results of a new detector system for gamma ray isotopic measurements  

SciTech Connect (OSTI)

A new type of gamma-ray detector system for isotopic measurements has been developed. This new system, a ``Duo detector`` array, consists of two intrinsic germanium detectors, a planar followed by a coaxial mounted on the same axis within a single cryostat assembly. This configuration allows the isotopic analysis system to take advantage of spectral data results that are collected simultaneously from different gamma-ray energy regimes. Princeton Gamma Tech (PGT) produced several prototypes of this Duo detector array which were then tested by Rocky Flats personnel until the design was optimized. An application for this detector design is in automated, roboticized NDA systems such as those being developed at the Los Alamos TA-55 Plutonium Facility. The Duo detector design reduces the space necessary for the isotopic instrument by a factor of two (only one liquid nitrogen dewar is needed), and also reduces the complexity of the mechanical systems and controlling software. Data will be presented on measurements of nuclear material with a Duo detector for a wide variety of matrices. Results indicate that the maximum count rate can be increased up to 100,000 counts per second yet maintaining excellent resolution and energy rate product.

Malcom, J.E.; Bonner, C.A.; Hurd, J.R. [Los Alamos National Lab., NM (United States); Fleissner, [EG and G Rocky Flats, Inc., Golden, CO (United States)

1993-08-01T23:59:59.000Z

469

Sodium reflux pool-boiler solar receiver on-sun test results  

SciTech Connect (OSTI)

The efficient operation of a Stirling engine requires the application of a high heat flux to the relatively small area occupied by the heater head tubes. Previous attempts to couple solar energy to Stirling engines generally involved directly illuminating the heater head tubes with concentrated sunlight. In this study, operation of a 75-kW{sub t} sodium reflux pool-boiler solar receiver has been demonstrated and its performance characterized on Sandia's nominal 75-kW{sub t} parabolic-dish concentrator, using a cold-water gas-gap calorimeter to simulate Stirling engine operation. The pool boiler (and more generally liquid-metal reflux receivers) supplies heat to the engine in the form of latent heat released from condensation of the metal vapor on the heater head tubes. The advantages of the pool boiler include uniform tube temperature, leading to longer life and higher temperature available to the engine, and decoupling of the design of the solar absorber from the engine heater head. The two-phase system allows high input thermal flux, reducing the receiver size and losses, therefore improving system efficiency. The receiver thermal efficiency was about 90% when operated at full power and 800{degree}C. Stable sodium boiling was promoted by the addition of 35 equally spaced artificial cavities in the wetted absorber surface. High incipient boiling superheats following cloud transients were suppressed passively by the addition of small amounts of xenon gas to the receiver volume. Stable boiling without excessive incipient boiling superheats was observed under all operating conditions. The receiver developed a leak during performance evaluation, terminating the testing after accumulating about 50 hours on sun. The receiver design is reported here along with test results including transient operations, steady-state performance evaluation, operation at various temperatures, infrared thermography, x-ray studies of the boiling behavior, and a postmortem analysis.

Andraka, C E; Moreno, J B; Diver, R B; Moss, T A [Oak Ridge National Lab., TN (United States)] [Oak Ridge National Lab., TN (United States)

1992-06-01T23:59:59.000Z

470

Cleaning and materials compatibility test results for elimination of flammable solvents in wipe applications.  

SciTech Connect (OSTI)

In recent years, efforts have been made within the nuclear weapons complex (National Nuclear Security Administration) of the Department of Energy (DOE) to replace Resource Conservation and Recovery Act (RCRA) regulated solvents (i.e., flammable, toxic, corrosive, and reactive) and ozone-depleting chemicals (ODC) with more benign alternatives. Within the National Nuclear Security Administration (NNSA) and the Department of Defense (DoD) sectors, these solvents are used for cleaning hardware during routine maintenance operations. A primary goal of this study is to replace flammable solvents used in wiping applications. Two cleaners, including a hydrofluoroether (HFE) and an azeotrope of the HFE and isopropyl alcohol (IPA), have been studied as potential replacements for flammable solvents. Cleaning efficacy, short-term and long-term materials compatibility, corrosion, drying times, flammability, environment, safety and health (ES&H) and accelerated aging issues were among the experiments used to screen candidate solvents by the interagency team performing this work. This report presents cleaning efficacy results as determined by the contact angle Goniometer as well as materials compatibility results of various metal alloys and polymers. The results indicate that IPA (baseline cleaner) and the HFE/IPA azeotrope are roughly equivalent in their ability to remove fluorinated grease, silicone grease, and a simulated finger print contaminant from various metal alloys. All of the ASTM sandwich and immersion corrosion tests with IPA, HFE or the HFE/IPA azeotrope on metal alloys showed no signs of corrosion. Furthermore, no deleterious effects were noted for polymeric materials immersed in IPA, HFE, or the HFE/IPA azeotrope.

Lopez, Edwin Paul

2005-06-01T23:59:59.000Z

471

Electric vehicle fleet operations in the United States  

SciTech Connect (OSTI)

The United States Department of Energy (DOE) is actively supporting the development and commercialization of advanced electric vehicles, and advanced batteries and propulsion systems. As part of this effort, the DOE Field Operations Program is performing commercial validation of electric vehicles. These efforts have included on-board data acquisition of electric vehicle operations and baseline performance testing. The baseline performance tests focus on parameters such as range, acceleration, and battery charging. This testing, performed in conjunction with EV America, has included the baseline performance testing of 14 electric vehicles will also be baseline performance tested. The baseline performance testing has documented annual improvements in performance. This and additional information is made available to the public via the internet homepage (http://ev.inel.gov). The Field Operations Program continues to support the development of electric vehicles and infrastructure in conjunction with its new qualified vehicle test partners: Electric Transportation Application of Phoenix, and Southern California Edison. The Field Operations Program is managed by the Lockheed Martin Idaho Technologies Company, at the Idaho National Engineering Laboratory. 4 refs., 5 figs., 2 tabs.

Francfort, J.E. [Idaho National Engineering and Environmental Lab., Idaho Falls, ID (United States); O`Hara, D. [Dept. of Energy, Washington, DC (United States)

1997-10-01T23:59:59.000Z

472

Results of Characterization and Retrieval Testing on Tank 241-C-110 Heel Solids  

SciTech Connect (OSTI)

Nine samples of heel solids from tank 241-C-110 were delivered to the 222-S Laboratory for characterization and dissolution testing. After being drained thoroughly, the sample solids were primarily white to light-brown with minor dark-colored inclusions. The maximum dimension of the majority of the solids was <2 mm; however, numerous pieces of aggregate, microcrystalline, and crystalline solids with maximum dimensions ranging from 5-70 mm were observed. In general, the larger pieces of aggregate solids were strongly cemented. Natrophosphate [Na{sub 7}F(PO{sub 4}){sub 2}?19H{sub 2}O] was the dominant solid phase identified in the heel solids. Results of chemical analyses suggested that 85-87 wt% of the heel solids were the fluoridephosphate double salt. The average bulk density measured for the heel solids was 1.689 g/mL; the reference density of natrophosphate is 1.71 g/mL. Dissolution tests on composite samples indicate that 94 to 97 wt% of the tank 241-C-110 heel solids can be retrieved by dissolution in water. Dissolution and recovery of the soluble components in 1 kg (0.59 L) of the heel solids required the addition of ≈9.5 kg (9.5 L) of water at 15 ?C and ≈4.4 kg (4.45 L) of water at 45 ?C. Calculations performed using the Environmental Simulation Program indicate that dissolution of the ≈0.86 kg of natrophosphate in each kilogram of the tank 241-C-110 heel solids would require ≈9.45 kg of water at 15 ?C and ≈4.25 kg of water at 45 ?C. The slightly larger quantities of water determined to be required to retrieve the soluble components in 1 kg of the heel solids are consistent with that required for the dissolution of solids composed mainly of natrophosphate with a major portion of the balance consisting of highly soluble sodium salts. At least 98% of the structural water, soluble phosphate, sodium, fluoride, nitrate, carbonate, nitrite, sulfate, oxalate, and chloride in the test composites was dissolved and recovered in the dissolution tests. Most of the {sup 99}Tc and {sup 137}Cs present in the initial heel solids composites was removed in the water dissolution tests. The estimated activities/weights of {sup 129}I, {sup 234}U, {sup 235}U, {sup 236}U, and {sup 238}U in the dry residual solids were <25% of the weights/activities in the initial composite solids. Gibbsite and nordstrandite [both Al(OH){sub 3}] were the major solid phases identified in the solids remaining after completion of the dissolution tests. Chemical analysis indicated that the residual solids may have contained up to 62 wt% Al(OH){sub 3}. Significant quantities of unidentified phosphate-, iron-, bismuth-, silicon-, and strontium- bearing species were also present in the residual solids. The reference density of gibbsite (and nordstrandite) is 2.42 g/mL. The measured density of the residual solids, 2.65 g/mL, would be a reasonable value for solids containing gibbsite as the major component with minor quantities of other, higher density solids. Sieve analysis indicated that 22.2 wt% of the residual solids were discrete particles >710 μm in size, and 77.8 wt% were particulates <710 μm in size. Light-scattering measurements suggested that nearly all of the <710-μm particulates with diameters >12 μm were weakly bound aggregates of particles with diameters <2 μm. The <710-μm residual solids settled very slowly when dispersed in reagent water. The physical appearance of a suspension containing ≈0.4 vol% of the solids in pure water changed very little over a period of 46.5 hours. It should be noted that the distribution of particle sizes in the residual solids and the observed settling behavior were both strongly influenced by the procedures followed in the dissolution tests.

Callaway, William S.

2013-09-30T23:59:59.000Z

473

BP-5 Remedial Investigation Slug-Test Characterization Results for Well 699-52-55A  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory conducted slug-test characterization at the final, completed BP-5 Remedial Investigation well 699-52-55A near the 200-East Area at the Hanford Site on April 22, 2008. The slug-test characterization was in support of the BP-5 Remedial Investigation. The portion of the unconfined aquifer tested is composed of sediments of the lower Ringold Formation and the underlying Elephant Mountain basalt flowtop. The basalt flowtop unit was included as part of the effective test-interval length for the slug-test analysis because the flowtop unit is hydraulically communicative with the unconfined aquifer. Estimates of hydraulic conductivity for the effective test-interval length represent composite values for the lower Ringold Formation and the underlying Elephant Mountain basalt flow top.

Newcomer, Darrell R.

2008-07-21T23:59:59.000Z

474

E-Print Network 3.0 - asme power test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to facilitate simulation and testing in early stages of the system design process. Abstraction... and hardware systems. Abstract State Machines, or ASMs, are well...

475

E-Print Network 3.0 - abrasion testing wear Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of boric acid, wear tests were performed at several distinct lubrication states... rape seed. Throughout all of the wear ... Source: Sawyer, Wallace - Department of...

476

China Energy Efficiency Round Robin Testing Results for Room Air Conditioners  

E-Print Network [OSTI]

L ABORATORY China Energy Efficiency Round Robin TestingNeed to Improve the Energy Efficiency of Energy Consumingfor Implementing the China Energy Efficiency Label System (

Zhou, Nan

2010-01-01T23:59:59.000Z

477

E-Print Network 3.0 - area tonopah test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test Range Manager. CI36 - REQUIREMENTS FOR ACCESS TO GOVERNMENT SITES Permission to enter... Security Division at Livermore; Tonopah ... Source: Fuerschbach, Phillip - Joining...

478

E-Print Network 3.0 - analog field tests Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Science and Engineering, SOC (System-on-Chip) Design and Test Lab. Collection: Engineering 73 How scientists think: On-line creativity and conceptual change in Summary:...

479

E-Print Network 3.0 - analytic method tested Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Environmental Thermal Systems Research Group at Oklahoma State University (www.hvac.okstate.edu) Summary: .D. Spitler, S.J. Rees. 2002. An Analytical Verification Test...

480

E-Print Network 3.0 - area field test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

develop, adjust and test two different methods... digital elevation model (DEM) of a potato field in central Sweden. Elevation data were registered Source: Harrie, Lars -...

Note: This page contains sample records for the topic "fleet testing results" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

E-Print Network 3.0 - agglutination test mat Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Geosciences 4 ABO, D Blood Typing and Subtyping Using Plug-Based Microfluidics Summary: -phase agglutination gel tests are used for greater than 90% of all ABO...

482

E-Print Network 3.0 - advanced burner test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

POWER Vol. 21, No. 1, JanuaryFebruary 2005 Summary: each test sequence. IV. Blowout Phenomenology A. Piloted Burner In this section, we describe... attachment to nonattachment at...

483

Text-Alternative Version: CALiPER Round 11 Test Results  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the "U.S. DOE CALiPER Program Summary of Most Recent Testing" webcast, held February 8, 2011.

484

E-Print Network 3.0 - anxiety screening test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for implicit... of the Implicit Association Test (IAT).20 More specifically, our task was adapted from the IAT-Anxiety,13... IS THERE A QUADRATIC RELATION BETWEEN...

485

E-Print Network 3.0 - adaptive group testing Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the test phase. For subject group 1, the ... Source: Dobkins, Karen R. - Department of Psychology, University of California at San Diego Collection: Biology and Medicine 50...

486

E-Print Network 3.0 - antenna test facility Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to create a new-generation space radio facility 12;LOFAR Low... Frequency Array Netherland, Lower Saxony, Schleswig- Holstein... Test station at Exloo, full scale......

487

E-Print Network 3.0 - almera proficiency test Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for International Students for the Academic Year of 2012 Summary: , IB, etc.), awards, certificateslicenses, and scores of language proficiency tests are representative......

488

E-Print Network 3.0 - atomic bomb tests Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

go off: Nuclear Test Sites and the Spectacle Miss Atomic Bomb... and culture. Atomic tourism started at the beginning of the Cold War when televised atomic bomb detonations......

489

E-Print Network 3.0 - animal toxicity testing Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: differentiated toxic from nontoxic sam- ples. It is suggested that the RIA test in its present state is useful... administration into appropriate animals....

490

Emissions Reductions as a Result of Automobile Improvement  

E-Print Network [OSTI]

Emissions Reductions as a Result of Automobile Improvement S A J A L S . P O K H A R E L , G A R Y emissions of automobile fleets in Denver for 13 years and in two other U.S. cities for 5 years. Analysis of these fleets shows that newer automobiles, during a period of fairly constant new car standards, have become

Denver, University of

491

Test results of performance and oil circulation rate of commercial reciprocating compressors of different capacities working with  

E-Print Network [OSTI]

others. The compressors used POE oil as lubricant and additional oil circulation rate (OCR) testsTest results of performance and oil circulation rate of commercial reciprocating compressors at steady state conditions were done to evaluate possible effects and differences to the traditionally used

Fernández de Córdoba, Pedro

492

Assessing deployment strategies for ethanol and flex fuel vehicles in the U.S. light-duty vehicle fleet  

E-Print Network [OSTI]

Within the next 3-7 years the US light duty fleet and fuel supply will encounter what is commonly referred to as the "blend wall". This phenomenon describes the situation when more ethanol production has been mandated than ...

McAulay, Jeffrey L. (Jeffrey Lewis)

2009-01-01T23:59:59.000Z

493

Audit Report VEHICLE FLEET MANAGEMENT AT THE IDAHO NATIONALENGINEERING AND ENVIRONMENTAL LABORATORY, WR-B-99-02  

Broader source: Energy.gov [DOE]

In a prior report, Audit of Light Vehicle Fleet Management at the Idaho National Engineering Laboratory, WR-B-93-7, September 29, 1993, the Office of Inspector General (OIG) concluded that vehicle...

494

An Empirical Study of Alternative Fuel Vehicle Choice by Commercial Fleets: Lessons in Transportation Choices, and Public Agencies' Organization  

E-Print Network [OSTI]

1990). “The Economics of Alternative Fuel Use: SubstitutingAn Empirical Study of Alternative Fuel Vehicle Choice byFleet Demand for Alternative-Fuel Vehicles,” with T. Golob,

Crane, Soheila Soltani

1996-01-01T23:59:59.000Z

495

Evaluating the impact of advanced vehicle and fuel technologies in U.S. light duty vehicle fleet  

E-Print Network [OSTI]

The unrelenting increase in oil use by the U.S. light-duty vehicle (LDV) fleet presents an extremely challenging energy and environmental problem. A variety of propulsion technologies and fuels have the promise to reduce ...

Bandivadekar, Anup P

2008-01-01T23:59:59.000Z

496

This paper presents the results of testing a Web-based Interactive Landform Simulation Model (WILSIM) in a  

E-Print Network [OSTI]

ABSTRACT This paper presents the results of testing a Web-based Interactive Landform Simulation Model (WILSIM) in a general education physical geography course. The goal was to determine whether

Luo, Wei

497

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Grand Canyon National Park  

SciTech Connect (OSTI)

This report focuses on the Grand Canyon National Park (GCNP) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively PEVs) can fulfill the mission requirements.

Stephen Schey; Jim Francfort; Ian Nienhueser

2014-08-01T23:59:59.000Z

498

Assessment of methane-related fuels for automotive fleet vehicles: technical, supply, and economic assessments  

SciTech Connect (OSTI)

The use of methane-related fuels, derived from a variety of sources, in highway vehicles is assessed. Methane, as used here, includes natural gas (NG) as well as synthetic natural gas (SNG). Methanol is included because it can be produced from NG or the same resources as SNG, and because it is a liquid fuel at normal ambient conditions. Technological, operational, efficiency, petroleum displacement, supply, safety, and economic issues are analyzed. In principle, both NG and methanol allow more efficient engine operation than gasoline. In practice, en