Powered by Deep Web Technologies
Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

2

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

3

City of Quincy, FL Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

FL Smart Grid Project FL Smart Grid Project Jump to: navigation, search Project Lead City of Quincy, FL Country United States Headquarters Location Quincy, Florida Recovery Act Funding $2,471,041.00 Total Project Value $4,942,082.00 Coverage Area Coverage Map: City of Quincy, FL Smart Grid Project Coordinates 30.5871392°, -84.5832453° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

4

Project Year Project Title  

E-Print Network (OSTI)

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

5

Project Year Project Title  

E-Print Network (OSTI)

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

6

Project Year Project Title  

E-Print Network (OSTI)

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

7

PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richmond Richmond PROJECT TITLE: EECBG - Solar Compactors and Recycling Units Page 1 of2 STATE: VA Funding Opportunity Announcement Number DE-FOA-0000013 Procurement Instrument Number DE-EE0000878 NEPA Control Number cm Number GFO-0000878-003 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

8

PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Baltimore Baltimore PROJECT TITLE: EECBG - GHG Scrubbing System Page 1 of2 STATE: MD Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-EE0000738 GFO-0000738-002 0 Based all my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: All Technical advice and planning assistance to international, national, state, and local organizations. 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

9

Project Year Project Title  

E-Print Network (OSTI)

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

10

Project Year Project Title  

E-Print Network (OSTI)

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

11

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

12

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

13

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

14

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

15

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

16

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

17

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

18

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

19

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

20

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

22

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

23

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

24

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

25

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

26

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

27

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

28

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

29

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

30

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

31

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

32

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

33

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

34

Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

35

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

36

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

37

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

38

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring Geological CO Monitoring Geological CO 2 Sequestration using Perfluorocarbon and Stable Isotope Tracers Project Number FEAA-045 Tommy J. Phelps and David R. Cole* Oak Ridge National Laboratory Phone: 865-574-7290 email: phelpstj@ornl.gov (*The Ohio State University) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Developing the Technologies and Building the Infrastructure for CO 2 Storage August 22, 2013 2 Project Overview: Goals and Objectives Goal: Develop methods to interrogate subsurface for improved CO 2 sequestration, field test characterization and MVA, demonstrate CO 2 remains in zone, and tech transfer. Objectives: 1. Assessment of injections in field. PFT gas tracers are analyzed by GC-ECD to

39

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Acknowledgments Dave Harris, Kentucky Geological Survey Dave Barnes, Western Michigan University John Rupp, Indiana Geological Survey Scott Marsteller, Schlumberger Carbon Services John McBride, Brigham Young University * Project is funded by the U.S. Department of Energy through the National Energy Technology Laboratory (NETL) and by a cost share agreement with the Illinois Department of Commerce and Economic Opportunity, Office of Coal Development through the Illinois Clean Coal Institute * ConocoPhillips: in-kind match * Western Kentucky Carbon Storage Foundation: matching funding * SeisRes 2020, Houston: VSP acquisition and processing

40

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Results from Simulation Project Results from Simulation Framework for Regional Geologic CO 2 Storage Infrastructure along Arches Province of Midwest United States DOE Award No. DE-FE0001034 Ohio Dept. of Dev. Grant CDO/D-10-03 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting August 21-23, 2012 Joel Sminchak and Neeraj Gupta Battelle Energy Systems sminchak@battelle.org, 614-424-7392 gupta@battelle.org, 614-424-3820 BUSINESS SENSITIVE 2 Presentation Outline 1. Technical Status 2. Background (CO 2 Sources, Geologic Setting) 3. Injection Well history 4. Geocellular Model Development 5. Geological Data (Geological dataset, Geostatistics) 6. Geocellular porosity/permeability model development 7. Pipeline Routing Analysis

42

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

43

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

44

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

45

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

46

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

47

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

48

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

49

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

50

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

51

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Seal Repair Using Seal Repair Using Nanocomposite Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Ed Matteo, Thomas Dewers Sandia National Laboratories 2 Presentation Outline * Introduction and overview * Materials synthesis * Materials testing and characterization * Annular seal system testing * Numerical simulation * Summary 3 Benefit to the Program * BENEFITS STATEMENT: The project involves the development and testing of polymer-cement nanocomposites for repairing flaws in annular wellbore seals. These materials will have superior characteristics compared to conventional

52

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

53

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

54

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

55

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

56

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

57

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool to Improve CO2 Sequestration DE FE0004542 Larry Murdoch, Clemson University Stephen Moysey, Clemson University Leonid Germanovich, Georgia Tech Cem Ozan, Baker Hughes Sihyun Kim, Georgia Tech Glenn Skawski, Clemson University Alex Hanna, Clemson University Johnathan Ebenhack, Clemson University Josh Smith, Clemson University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool, Larry Murdoch Project Review Meeting, 23 Aug. 2013 2 Presentation Outline * Preliminaries

58

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-FE0001836: DE-FE0001836: Numerical modeling of geomechanical processes related to CO 2 injection within generic reservoirs Andreas Eckert & Runar Nygaard Missouri University of Science & Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Objectives, Benefits and Outcomes * Technical status: Project summary - Teaching - Reservoir scale (Geomechanics & Fluid flow simulation) - Borehole scale (Wellbore integrity & wellbore trajectory planning) * Conclusions * Appendix 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

59

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-FE0002225: DE-FE0002225: Actualistic and geochemical modeling of reservoir rock, CO 2 and formation fluid interaction, Citronelle oil field, Alabama West Virginia University & University of Alabama Presenter: Dr. Amy Weislogel (WVU) Co-PI: Dr. Rona Donahoe (UA) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Overview & Project Map * Reservoir Geochemical Characterization * Formation Fluid Geochemistry * Geochemical Modeling * Summary 3 Benefit to the Program * Develop technologies that will support industries'

60

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Investigating the Fundamental Investigating the Fundamental Scientific Issues Affecting the Long-term Geologic Storage of Carbon Dioxide Project Number DE-FE0000397 Lee H Spangler Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Computational tool development * Laboratory studies to understand subsurface CO 2 behavior * Analog studies to inform risk analysis * Near surface detection technologies / testing * Mitigation method development 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

FE/NETL CTS Cost Models and FE/NETL CTS Cost Models and Benefits Assessment of Carbon Storage R&D Program David Morgan Benefits Division Office of Program Planning and Analysis National Energy Technology Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 OFFICE OF FOSSIL ENERGY 2 Presentation Outline * Overview of benefits assessment * Overview of FE/NETL models used to assess benefits of CO 2 capture and storage * Benefits evaluation of Storage Program's R&D projects using a model to estimate costs of CO 2 storage in a saline aquifer * Description of model used to estimate costs of

62

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline * Benefit to the program * Project overview: Why 14 C for MVA? * Technical status: Cartridges, injections, lasers * Summary * Organizational chart * Collaborators 3 Benefit to the Program * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Permanent storage of CO 2 can be demonstrated by adding carbon-14 ( 14 C) prior to injection. This research project aims to demonstrate this by tagging fossil CO 2 with 14 C at a field site. When completed, this system will show that 14 C can be a safe and effective tracer for sequestered CO 2 . A laser-based 14 C measurement method is being adapted for continuous monitoring. This technology contributes to the Carbon Storage Program's effort of ensuring 99 percent

63

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Leakage Pathways and Leakage Pathways and Mineralization within Caprocks for Geologic Storage of CO 2 Project DE-FC26-0xNT4 FE0001786 James P. Evans Utah State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Goals and Objectives * Relationship to overall program goals * Overview of seal bypass * Technical status; bypass systems - Field based studies - Technological advances * Accomplishments and Summary * Appendices 3 Benefit to the Program * Program goals addressed * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

64

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Michael G. Waddell Earth Sciences and Resources Institute University of South Carolina U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 2 Presentation Outline * Project goals and benefits * Overview of the geology of the South Georgia Rift basin in SC * Results of petrographic and core analysis from the Rizer #1 * Future investigations in the SGR * Summary 3 Benefit to the Program Program Goals: * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected

65

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Micro-Structured Sapphire Fiber Sensors for Micro-Structured Sapphire Fiber Sensors for Simultaneous Measurements of High-T and Dynamic Gas Pressure in Harsh Environments DE-FE0001127 Investigators: Hai Xiao, Hai-Lung Tsai, Missouri University of Science and Technology Junhang Dong, University of Cincinnati Program Manager: Norm Popkie, Gasification Division, NETL DOE Project Kickoff Meeting in the NETL Pittsburgh December 15, 2009 Outline * Background * Objectives * Project Elements * Management Plan * Research Plan and Approaches * Risk Management * Summary Background * Demands: High-performance, reliable, in situ sensors are highly demanded for advanced process control and lifecycle management in existing and future advanced power and fuel systems - Improved efficiency/safety/reliability/availability/maintainability

66

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Mart Oostrom Mart Oostrom Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline  Project overview  Sub-Task 1: Investigation of CO 2 migration in heterogeneous porous media  Sub-Task 2: Modeling CCUS deployment in China  Summary Collaboration with China on Clean Energy Research 3 Benefit to the Program The Clean Energy Partnership was established by a memorandum of understanding between the Chinese Academy of Sciences, the National Energy Technology Laboratory and the Pacific Northwest National Laboratory in May of 2009 with the goal of significantly reducing the environmental emissions and improving the efficiency of

67

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Evaluation of Evaluation of Geophysical Methods for Monitoring and Tracking CO 2 Migration in the Subsurface PI: Jeffrey Daniels Co-PI: Robert Burns & Franklin Schwartz Students: Michael Murphy & Kyle Shalek The Ohio State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 FOA Number: DE-FOA-0000032 NETL Award Number: DE-FE0002441 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 3 Benefit to the Program * Program Goal: Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones

68

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

capillary trapping (FE0004956), Bryant, UT-Austin capillary trapping (FE0004956), Bryant, UT-Austin Influence of Local Capillary Trapping on Containment System Effectiveness DE-FE0004956 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Local capillary trapping (FE0004956), Bryant, UT-Austin Local capillary trapping (FE0004956), Bryant, UT-Austin

69

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and objectives * Carbon gasification * Carbon reactivity studies * Catalyst development * Techno-economic analysis * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

70

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Improved Caprock Integrity and Improved Caprock Integrity and Risk Assessment Techniques Project Number (FE0009168) Michael Bruno, PhD, PE GeoMechanics Technologies U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Introduction and Motivation 2 A primary requirement for long-term geologic storage and containment of carbon dioxide is ensuring caprock integrity. Large-scale CO2 injection requires improved and advanced simulation tools and risk assessment techniques to better predict and help control system failures, and to enhance performance of geologic storage. GeoMechanics Technologies is developing enhanced simulation and risk analysis approaches to assess and

71

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin Inexpensive Monitoring and Uncertainty Assessment of CO 2 Plume Migration DOE-FE0004962 Steven Bryant The University of Texas at Austin U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin 2 Presentation Outline * Motivation and relevance to Program * Project goals * Technical status * Accomplishments * Summary * Future plans Inexpensive plume monitoring (FE0004962), Bryant and Srinivasan, UT-Austin

72

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Basin-Scale Leakage Risks from Basin-Scale Leakage Risks from Geologic Carbon Sequestration: Impact on CCS Energy Market Competitiveness Catherine A. Peters Jeffery P. Fitts Michael A. Celia Princeton University Paul D. Kalb Vatsal Bhatt Brookhaven National Laboratory Elizabeth J. Wilson Jeffrey M. Bielicki Melisa Pollak University of Minnesota DOE Award DE-FE0000749 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to CCUS research program * Project Goals & Objectives * Technical Status  Thrust I - Reservoir-scale simulations of leakage potential with permeability evolution

73

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

for Modeling CO for Modeling CO 2 Processes: Pressure Management, Basin-Scale Models, Model Comparison, and Stochastic Inversion ESD09-056 Jens T. Birkholzer with Abdullah Cihan, Marco Bianchi, Quanlin Zhou, Xiaoyi Liu, Sumit Mukhopadhyay, Dorothee Rebscher, Barbara Fialeix Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview and Technical Status - Task 1: Optimization of Brine Extraction for Pressure Management and Mitigation - Task 2: Basin-scale Simulation of CO 2 Storage in the Northern Plains - Prairie Basal Aquifer - Task 3: Sim-SEQ Model Comparison

74

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Beneficial Use of CO Beneficial Use of CO 2 in Precast Concrete Production DE-FE0004285 Yixin Shao, Yaodong Jia Liang Hu McGill University 3H Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation outline * Goals and objectives * Benefits to the program * Project overview * Technical status * Accomplishment to date * Summary 2 Objective Masonry blocks Fiber-cement panels Prefabricated buildings Concrete pipes To develop a carbonation process to replace steam curing in precast concrete production for energy reduction, and carbon storage and utilization. Goals * CO 2 sequestration capacity by cement:

75

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

University of Kansas Center for Research University of Kansas Center for Research Kansas Geological Survey U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 Presentation Outline * Benefits, objectives, overview * Methods * Background & setting * Technical status * Accomplishments * Summary Benefit to the Program * Program goal addressed: Develop technologies that will support the industries' ability to predict CO 2 storage capacity in geologic formations to within ± 30 percent. * Program goal addressed: This project will confirm - via a horizontal test boring - whether fracture attributes derived from 3-D seismic PSDM Volumetric Curvature (VC) processing are real. If

76

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Brian Turk Research Triangle Institute U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project benefits and objectives * Carbon reactivity studies * Catalyst mechanism studies * Catalyst development * Test results * Summary 3 Benefit to the Program * Program goal: Reduce CO 2 emissions by developing beneficial uses that meet the DOE net cost metric of $10/MT for captured CO 2 that will mitigate CO 2 emissions in areas where geological storage may not be an optimal solution * Benefits statement: Development of a commercial process for converting CO 2 and a carbon source into a commodity chemical at a

77

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Advanced simulation tool for quantifying transport in porous and fractured geological formations during CO 2 sequestration that includes all mechanisms: convection, diffusion, dissolution and chemical reactions * A simulator that can fully model these processes does not currently exist * Simulator will contribute to our ability to predict CO 2 storage capacity in geologic formations, to within ±30 percent 4 Project Overview: Goals and Objectives Comprehensive reservoir simulator for investigation of CO 2 non-isothermal, multiphase flow and long-term storage in

78

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Thomas J. Wolery Thomas J. Wolery Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 LLNL-PRES-574632 2 Team Members * Roger Aines * Bill Bourcier * Tom Wolery * Tom Buscheck * Tom Wolfe (consultant) * Mike DiFilippo (consultant) * Larry Lien (Membrane Development Specialists) 3 Presentation Outline * Overview of Active CO 2 Reservoir Management (ACRM) * Subsurface Reservoir Management: Made Possible by Brine Production, Yielding Many Benefits * Brine Disposal Options - What brines are out there? - What are the treatment options? 4 Benefit to the Program * This project is identifying and evaluating

79

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

William Bourcier William Bourcier Lawrence Livermore National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Saline Aquifer Brine Production Well Brine Injection Well Chiller Pretreatment Desalination Brine Permeate To power plant or other use Storage pump CO 2 injection Concept is to extract and desalinate aquifer brines to create fresh water and space for CO 2 storage cap-rock 3 Presentation Outline * Overview, Purpose, Goals and Benefits * Technical status - Brine treatment and disposition - Reservoir management * Accomplishments * Summary and Planned work Goals and Objectives Technical Goals Potential advantages of brine

80

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Metrics for Screening CO Metrics for Screening CO 2 Utilization Processes Peter Kabatek Energy Sector Planning and Analysis (ESPA) Services / WorleyParsons U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * NETL's Carbon Storage Program * Introduction of the metrics * Review of the case study technology * Application of metrics to the case study technology * Discussion of metrics interpretation and grouping 3 NETL Carbon Storage Program * The Carbon Storage Program contains three key elements: - Infrastructure - Global Collaborations - Core Research and Development: * Monitoring, Verification and Accounting (MVA) * Geologic Storage

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Reservoir Simulation Model * Intelligent Leakage Detection System (ILDS) * Accomplishments * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. CO2 Leakage(X,Y,Q) Artificial Intelligence & Data Mining Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 : * Conference call * Site selection criteria - November 17 th 2009: * A meeting during the Regional Carbon Sequestration Partnership Meeting in Pittsburgh

82

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Factors Influencing Factors Influencing CO 2 Storage Capacity and Injectivity in Eastern Gas Shales Contract No. DE-FE0004633 Michael Godec, Vice President Advanced Resources International mgodec@adv-res.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Benefits * Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefits to the Program * Program Goals Addressed - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.

83

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Training and Research Peter M. Walsh University of Alabama at Birmingham U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh, Pennsylvania August 21-23, 2012 DE-FE0002224 * Evaluation of the sealing capacity of caprocks serving as barriers to upward migration of CO 2 sequestered in geologic formations. * Education and training of undergraduate and graduate students, through independent research on geologic sequestration. * Education, through an advanced undergraduate/graduate level course on coal combustion and gasification, climate change, and carbon sequestration. * Simulation of CO 2 migration and trapping in storage

84

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction - Objective - Industrial Review Committee - Background * Steps Involved - Geological and Reservoir Simulation Modeling - Leakage Modeling & Real-Time Data Processing - Pattern Recognition & Intelligent Leakage Detection System (ILDS) * Accomplishments to Date * Summary Objective * Develop an in-situ CO 2 leak detection technology based on the concept of Smart Fields. - Using real-time pressure data from permanent downhole gauges to estimate the location and the rate of CO 2 leakage. Industrial Advisory Committee (IAC) * Project goes through continuous peer-review by an Industrial Review Committee. * Meetings: - November 6 th 2009 :

85

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies assume a discrete reservoir/caprock interface with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 4 Reservoir Caprock Reservoir Introduction The nature of reservoir/caprock interfaces 4 Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person (Cooperating Scientist) NMT Modeling Stefan Raduha NMT Sedimentology

86

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Ketzin Collaboration Ketzin Collaboration ESD-09-056 Barry Freifeld Earth Sciences Division Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and objectives * Success Criteria * Technical Status * Latest developments in Integrated Monitoring * Summary and Lessons Learned 3 Image from: www.co2ketzin.de 4 Benefit to the Program * Program goal being addressed: - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * The Ketzin collaboration leverages information gained through the mid-scale geological sequestration experiment in Ketzin, Germany.

87

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Jennifer A. Kozak, Jennifer A. Kozak, 1,2 Dr. Fritz Simeon, 2 Prof. T. Alan Hatton,* ,2 and Prof. Timothy F. Jamison* ,1 1 Department of Chemistry and 2 Department of Chemical Engineering Massachusetts Institute of Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation, Goals, Objectives * Background * Cyclic Carbonate Synthesis via Catalytic Coupling of CO 2 and Epoxides * New Catalysts and Reaction Scope * Mechanism - A New Paradigm for Activating Epoxides * Conclusions 3 Benefit to the Program * Identify the Program goals being addressed. - Develop technologies to demonstrate that 99 percent

88

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. 485 Massachusetts Ave. Cambridge, MA 02139 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Benefits of a 14 CO 2 Field Analyzer to DOE MVA Program Goals Program Goals: 99% Containment Identify/Quantify CCS Credits Direct Tracking Verification Tight/Leaky Account for Natural Baseline MVA Atmosphere MVA Groundwater Ecosystem Health, Community Safety

89

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Building the Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix Introduction * Most storage modeling studies involve a caprock/reservoir interface, and assume a discrete contact with simple (uniform) flow conditions. * We address the question of whether or not heterogeneities at the interface influence transmission of CO 2 into the caprock 3 Introduction The nature of reservoir/caprock interfaces 4 Triassic-Jurassic Strata, San Rafael Swell, UT Organization 5 Peter Mozley (PD/PI) NMT Sedimentology James Evans (Co-PI) USU Structure Thomas Dewers (Co-I) Jason Heath (Staff) SNL Modeling Mark Person

90

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Verification and Verification and Accounting of Geologic Carbon Sequestration Using a Field Ready 14 C Isotopic Analyzer CCS Public Outreach: Pathway to Tradable CCS Securities DEFE 0001116 Bruno D.V. Marino PhD CEO, Founder Planetary Emissions Management, Inc. One Broadway, 14 th Floor Cambridge, MA 02142 bruno.marino@pem-carbon.com www.pem-carbon.com U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 20-22, 2013 All RIGHTS RESERVED © Benefits: Public Outreach CCS-MVA LINKED TRADABLE SECURITY Increase Public Confidence in CCS Increase Public involvement in CCS "Leakage Rate" Product Distinct from GHG "Credits"

91

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Geologic Geologic Characterization of the Triassic Newark Basin of Southeastern New York and Northern New Jersey (DE-FE0002352) Daniel J. Collins, PG, RG Sandia Technologies, LLC U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 * Acknowledgment: This material is based upon work supported by the Department of Energy [National Energy Technology Laboratory] under Award Number DE- FE0002352, Contract No. 18131 from the New York State Energy Research & Development Authority [NYSERDA], and "In Kind" Cost Share from Schlumberger Carbon Services, Weatherford Laboratories, National Oilwell Varco, New York State Museum, and Rutgers University.

92

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

RISK ASSESSMENT AND MONITORING OF RISK ASSESSMENT AND MONITORING OF STORED CO 2 IN ORGANIC ROCKS UNDER NON- EQUILIBRIUM CONDITIONS DOE (NETL) Award Number: DE-FE0002423 Investigator: Vivak (Vik) Malhotra DOE supported undergraduate student participants: Jacob Huffstutler, Ryan Belscamper, Stephen Hofer, Kyle Flannery,, Bradley Wilson, Jamie Pfister, Jeffrey Pieper, Joshua T. Thompson, Collier Scalzitti-Sanders, and Shaun Wolfe Southern Illinois University-Carbondale Carbondale, Illinois 62901-4401 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Carbon Storage Program * Program goals being addressed: - To attempt to answer whether CO

93

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Water-Rock Interactions Water-Rock Interactions and the Integrity of Hydrodynamic Seals FWP FE-10-001 Bill Carey Los Alamos National Laboratory Los Alamos, NM U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program Goal: Ensure retention of 99% of injected CO 2 * Focus: Wellbore integrity * Approach: Use field, experimental and computational methods - Determine long-term compatibility of wellbore materials with CO 2 - Determine leakage mechanisms - Predict well performance * Benefit: The research will provide a basis for evaluating the long-term performance of wells, guide remediation

94

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

© 2012 Paulsson, Inc. (PI) Development of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon Sequestration DE-FE0004522 Björn N.P. Paulsson Paulsson, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 ® © 2012 Paulsson, Inc. (PI) © 2012 Paulsson, Inc. (PI) * Goals: Design, build, and test a high performance borehole seismic receiver system to allow cost effective geologic Carbon Capture and Storage (CCS) * Objectives: A: Develop technology to allow deployment of a 1,000 level drill pipe deployed 3C Fiber Optic Geophone (FOG) receiver array for deep

95

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Space Geodesy and Geochemistry Space Geodesy and Geochemistry Applied to Monitoring and Verification of Carbon Capture and Storage Award # DE-FE0002184 Peter Swart University of Miami Tim Dixon University of South Florida U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * What is the Award For? * What Research Work is being Supported? * Geochemical Research What is the Award For? * Provides Support for the Training of Two Graduate Students - Student 1: Involved in analysis of SAR images - Student 2: Involved in modeling of sub-surface geochemistry and application of models for policy decisions

96

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

fluid-driven fracture fluid-driven fracture DE-FE0002020 Joseph F. Labuz Civil Engineering University of Minnesota U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits statement * Goal, objectives * Technical status: fracture code, experimental results (poro, AE) * Accomplishments * Summary 0 50 100 150 200 250 300 350 0.00 0.05 0.10 0.15 0.20 Lateral displacement [mm] Load [kN] 0 300 600 900 1200 1500 AE events inelastic deformation peak 3 Benefit to the Program * Goal: develop technologies to predict CO2 storage capacity in geologic formations. * Benefits statement: develop 3D boundary element code & experimental techniques

97

GY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:County of Escambia. FL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, , ... ~. u.s. DEPAR n-IENT OF ENER GY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:County of Escambia. FL PROJECT TITLE: Road Prison Geothermal Earth Coupled HVAC Upgrade Page 1 of2 STATE: FL Funding Opportunity Announcement Numbtr Procurement Instrument Number NEPA Control Number CID Number DE-FOA-OOOOO13 DE-EEOOOO764.oo1 0 Based on my review of the information concerning the proposed action. as NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination; ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

98

Project Title Project Sponsor (funding agency)  

E-Print Network (OSTI)

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

99

Title Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Coupled HCTM Phenomena Coupled HCTM Phenomena From Pore-scale Processes to Macroscale Implications DE-FE0001826 J. Carlos Santamarina Georgia Institute of Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline Project Overview: The Proposal Accomplishments: HTCM Coupled Processes Appendices: Contact Information Schedule Bibliography Presentation Outline Project Overview: The Proposal Accomplishments: HTCM Coupled Processes Appendices: Contact Information Schedule Bibliography Relevance "Faustian bargain"? long-term CO 2 geo-storage needed (C-economy + climate change)

100

Title Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Project DE-FE0001808 Novel Oxygen Carriers For Coal-Fueled Chemical Looping Combustion Western Kentucky University Presenter: Dr. Yan Cao Institute for Combustion Science and Environmental Technology February 25, 2011 Project Participants * PIs: Dr. Wei-Ping Pan Dr. Yan Cao * Students: Ms. Wen Ying (Master student) Mr. Andy Wang (Undergraduate student) Mr. Yanwen Cui (Master student) Introduction (limit - 1 slide) * Background on the project * Anticipated benefits Solid Oxygen Carriers 1. Commercially accepted kinetics - coupling and potential uncoupling (free oxygen) 2. Thermal Stability, Lower degradation, and Lower Attrition loss 3. Favored thermodynamics for pure CO 2 4. Opportunity to release of free oxygen for improvement of process kinetics;

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Header with Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

5NT42646 Zero Emissions Coal Syngas-Oxygen Turbo Machinery 5NT42646 Zero Emissions Coal Syngas-Oxygen Turbo Machinery FACT SHEET (42646) Oct. 2006 I. PROJECT PARTICIPANTS A. Siemens Power Generation, Inc. B. Florida Turbine Technologies, Inc. C. Clean Energy Systems, Inc. II. PROJECT DESCRIPTION A. Objective(s) - To develop a cost effective and highly efficient turbo machinery system that will work with an oxy-fuel combustor that generates very high temperature CO2 and steam mixture as the working fluid. After expansion of the working fluid, the CO2 is captured allowing near-zero emissions of NOx and carbon. The project will complete conceptual designs of alternate steam cycles and select one cycle for detailed design based on cost and feasibility studies. B. Relevancy - 1. Background: CES, Inc. has an operational oxy-fuel combustor that generates

102

Header with Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission 42648 - Micro-Mixing Lean Premix Systems for Ultra-Low Emission Hydrogen/Syngas Combustion 12/15/2006 FACT SHEET I. PROJECT PARTICIPANTS Parker Hannifin Corporation (Lead) Gas Turbine Fuel Systems Division, 9200 Tyler Blvd., Mentor OH 44060 PI: Dr. Adel Mansour (e-mail: amansour@parker.com, Ph.: 440-954-8171) University of California at Irvine UCI Combustion Laboratory, Irvine, CA 92617 Solar Turbines Incorporated 2200 Pacific Highway, San Diego CA 92101 II. PROJECT DESCRIPTION A. Objective(s) The overall objective of this DOE-Supported research and development program is to develop and test a next-generation, practical and scalable, high-performing, multi-point injector module for hydrogen and syngas fuels. The injector will use Parker Hannifin's

103

Header with Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 Shock Wave Compression rev060908, 6/14/06, rev 9/8/06 FACT SHEET Rampressor Shock Wave Compressor , DE-FC26-06NT42651 (Ramgen Power Systems, RPS) I. PROJECT PARTICIPANTS A. Prime Participant: Ramgen Power Systems, Inc (RPS) under cooperative Agreement DE-FC26-06NT42651 B. Sub-Award Participants: ASE Technologies (ASE), Manufacturing Resources Inc. (MRI), Geminus Technologies Development (GTD), Steve Kushnick, P.E., Alouette Technology. II. PROJECT DESCRIPTION A. Objective(s): Based on aerospace ramjet technology, Ramgen Power Systems is developing a novel more cost effective compressor concepts (air and carbon dioxide) for support of coal fueled gasification stationary power applications and for potential replacement of the compressor component in gas turbines.

104

Title Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Research 2011 Yearly Review Meeting Project DE-FE0002128 Analysis of microbial activity under a supercritical CO 2 atmosphere Massachusetts Institute of Technology Prof. Janelle Thompson, Department of Civil and Environmental Engineering February 24-26, 2011 Project Participants * Dr. Janelle Thompson, PhD, Assistant Professor, Civil and Environmental Engineering (MIT) * Dr. Hector Hernandez, PhD, Martin Luther King Postdoctoral Fellow (MIT) * Mr. Kyle Peet, doctoral student, Civil and Environmental Engineering, MIT * 2 undergraduates Janelle Hector Kyle 3 Why do microbes matter? CO 2 "trapping" mechanisms -biofilm barriers -mineralization Natural and Engineered Systems Mitchell et al, 2009 dawsonite Biofilm Barriers Biological catalysis of mineral trapping Can we recover life forms that grow in supercritical CO

105

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

106

Sustainability Project Fund Application Form Requirements Project Title  

E-Print Network (OSTI)

Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

Volesky, Bohumil

107

PMC·I'Fl.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I'Fl. I'Fl. 1)··1.0) , u.s. DEPARTUENT OF ENERGY EERE PROJECT M ANAGEMENT CENTER NEPA DETERl\IINATION RECIPIENT:Escambia County PROJECT TITLE: Landfill Gas Extraction and Control System Expansion and Modernization Page I of2 STATE: FL Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000013 DE-EE0000784 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling). document preparation (such as conceptual design or feasibility studies, analytical energy supply

108

Project Information Form Project Title Modeling for Local Impact Analysis  

E-Print Network (OSTI)

Project Information Form Project Title Modeling for Local Impact Analysis University University Research and Educational Foundation- $48,683.00 Total Project Cost $48,683.00 Agency ID or Contract Number Project We will develop a traffic simulation model for the Los Angeles region that will allow us

California at Davis, University of

109

Proposed Start Date: Title of Project  

E-Print Network (OSTI)

Proposed Start Date: Title of Project: 1 Department:Principal Investigator(s): 1. College: Phone/ Email: 5 6 7 8 Does project involve: Human subjects? No Yes VertebrateAnimals? No Yes Radioactive understand and agree to comply with the URI policies and procedures for misconduct, conflict of interest

Rhode Island, University of

110

Critical in PROJECT TITLE COMMENTS BPA NPCC  

E-Print Network (OSTI)

PROJECT NUMBER (BiOp Critical in Italics) PROJECT TITLE COMMENTS BPA NPCC 35019 Develop and Implement a Pilot Status and Trend Monitoring Program BPA reduced budget by $250,000 to reflect duplicate NPCC tier 2. NPCC budget reflects an assumption of a capital determination for some components; BPA has

111

Project Title: Thematic Analysis of Forensic  

E-Print Network (OSTI)

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 13 February, Noon Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

112

Project Title: Thematic Analysis of Forensic  

E-Print Network (OSTI)

Project Title: Thematic Analysis of Forensic Service Whanau/family Booklet Bachelor of Arts Application Deadline: 1 February, 2012 Project Description: The Canterbury Regional Forensic Service (http' and their families' journey through the Forensic Service. The data has already been transcribed but needs in

Hickman, Mark

113

Project Information Form Project Title Eco-Driving for Transit  

E-Print Network (OSTI)

Provided (by each agency or organization) DOT - $54,871.35 Total Project Cost $54,871.35 Agency IDProject Information Form Project Title Eco-Driving for Transit University Georgia Institute Project Second-by-second data for school buses, MARTA transit buses, and GRTA express buses

California at Davis, University of

114

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New power Line for new generator at ten sleep New power Line for new generator at ten sleep Dat e: 12114/10 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview 1. Brief project description (include Extend 3 phase power line from (existing) pole 99 to the Ten Sleep location for a new generator. The anything that could impact the transformer bank at the WDF will be dismantled, the line extended overhead, across 5 new power poles, to environment) the Ten Sleep Battery and the bank will be reassembled there. The new guy anchor at pole 99 will be located outside Palustrine wetlands. The line will be 34.5/19.920 KV, approximately 1,200 feet in length. 2. Legal location Ground disturbance will be minimal and have very little potential to affect the environment. 3. Duration of the project

115

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Dig d~ch from 24-51-5TX-1 0 to 24-AX-10 and reinstall electrical wire Date: 12120/2010 DOE Coda: Contractor Coda: Project Lead: Marcus Bruckner Project Overview 1 Dig ditch from 24-51-8TX-1 0 to 24-AX-10 and remove and replace electrical wire {N 2.7o') 1. Brief project desalptlon Pnclude anything that oould impact the 2. 24-51-5TX-10 and 24-AX-10 (SW r.tN 10TOWNSHIP 38 NORTH RANGE 78WEST) environment] 2. Leg allocation 3. 1 day 3. Duration of the project 4. Major equipment to be used 4. Backhoe The table below is to be completed by the Project Leed and reviewed by the Environmental Specialist and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey and contact the Technical Assurance Department.

116

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DETElU.flNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DETElU.flNATION DETElU.flNATION RECIPIENT: lowa State University PROJE(.T TITLE: An Undergraduate Minor in Wind Energy Science, Engineering, and Policy Page 1 of2 STATE : IA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA..()()()()()9() DE-EEOOO3549 GFO-l0-497 0 Based on my review orlhe inrormation concerning the proposed action, 85 NEPA Compliance Officer (authorized under DOE Order 451.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and

117

Project title: Principal Investigator(s)  

E-Print Network (OSTI)

No. 0123 Project title: Principal Investigator(s): Funding Agency: Submission deadline: Instruments, redeployment costs) OBS engineering and technical support cost: (on shore and at sea) Shipping: Travel and technical support for OBS operations at sea. The cost of providing this support (e.g., instrument charges

Menke, William

118

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reclamation of Pits and Boxes Reclamation of Pits and Boxes Date: Nov. 11 , 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview 1. Brief project description [include anything that Reclamation of Q!!]y the following Pits and Boxes : 1. T-2-11 could impact the environment) 2. B-1-10 Pit 2. Legal location 3. B-1-3 Pit 3. Duration of the project 4. T .Q-3 Concrete Sump Box 4. Major equipment to be used 5. B-2-10 Skim Box 6. B-1-14 Skim Box 7. 66-1-StX-14 Pit 8. T-5-10 Pit 9. WDFSkim Box 10. WDFUpperPit 11 . WDFLowerPit 12. B-1-3 Skim Box 13. T-3-3 Skim Box 14. T-1-20 Pit 15. T-2-34 Pit (A) 16. T-2-34 Pit (B) 17. B-1 -10 Skim Box 18. Carwash Skim Box 19. 5~1-SX-3-Madison Water Valve Box from 57-WX-3 20. T-5-3 Pit

119

RECIPIENT:Lake County, FL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lake County, FL Lake County, FL u.s. DEPARTIIIEN T OF ENERGY EERE PROJECT MANAGEMENT CEN T ER NEPA DETERlIJJNATION PROJECf TITLE: Lake County, FL EECBG SOW (S) Page lof2 STATE: FL Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Numbcr CID Numbtr OE·FOA-OOOOO13 DE·EE00Q0786.001 0 Based on my review of the information concerning the proposed adion, as NEPA Compliance Officer (authorized undtr DOE Order 451.IA), I have made the following determination: ex. EA, EIS APPENDIX AND NUMBER: Description: 65.1 Actions to conserve energy, demonstrate potential energy conserva tion, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

120

NEPA COMPLIANCE SURVEY J.-1{p Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

}:- }:- J.-1{p Project Information Project Title: Flowline leak @ 68-66-SX-34 Date: 1/26/2010 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview 011..- 1. What are the environmental Elimination of the flowline@ 68-66- SX-34. Dig up and locate leak. Take p ntaminated soil to land fann and impacts? record in log book. The duration of this project will be approx. 4-days. The equipment to be used is as follows backhoe, and welder. We will be eliminating the flowline and pumping to a tank set on location.So we don't 2. What is the legal location? have any leaks in the Mure. 3. What is the duration of the project? 4. What major equipment will be used if any (work over rig, drilling rig, etc.)? The table below Is to be completed by the Project Lead and nwlewed by the Environmental Specialist and the DOE NEPA

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)  

E-Print Network (OSTI)

BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County;BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Licensing: The Beacon project would have a nominal

122

Geothermal: Sponsored by OSTI -- Project Title: Small Scale Electrical...  

Office of Scientific and Technical Information (OSTI)

Project Title: Small Scale Electrical Power Generation from Heat Co-Produced in Geothermal Fluids: Mining Operation Geothermal Technologies Legacy Collection HelpFAQ | Site Map |...

123

Proceedings of the US Hydrographic Conference, Tampa, FL, 25-28 Apr 2011 THE PORT OF NORFOLK PROJECT  

E-Print Network (OSTI)

Proceedings of the US Hydrographic Conference, Tampa, FL, 25-28 Apr 2011 1 THE PORT OF NORFOLK for the Port of Norfolk Project are to explore viable methods of improvement with respect to both the process intuitive fashion, or providing it in a format that is inherently more useful. The Port of Norfolk Project

New Hampshire, University of

124

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source  

E-Print Network (OSTI)

Project Project Funding Operational & Maintenance Costs Univ. Project Title GSF Brief Description of Project Location Amount Source UF Minor Projects for UF 50,000 Minor projects for facilities located and education. Typical projects consist of Gainesville/ Typical projects other funding greenhouses, general

Slatton, Clint

125

Independence) PROJECT TITLE: Clinton Community Human Service Campus Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Area Substance Abuse Council, Inc (a SEP subrecipient of the Iowa Office of Energy STATE: IA Independence) PROJECT TITLE: Clinton Community Human Service Campus Project Page 1 of2 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE FOA 000052 EE0000162 GFO-0000162-015 EE162 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

126

Project Information Form Project Title Urban Spatial Structure and GHG Emissions  

E-Print Network (OSTI)

Project Information Form Project Title Urban Spatial Structure and GHG Emissions University UC specified GHG reduction targets. This requires clear evidence that links from urban spatial structure

California at Davis, University of

127

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network (OSTI)

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN schedule and procedures necessary to conclude the amendment review process. At the Prehearing Conference

128

Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project -Compliance  

E-Print Network (OSTI)

DOCKETED Docket Number: 09-AFC-07C Project Title: Palen Solar Power Project - Compliance TN-700-2009-004.PDF #12;2 Notice of Committee's Intention to Use Informal Hearing Procedures Pursuant

129

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project  

E-Print Network (OSTI)

Project ID: 35011 Title: The Floating Net Pen Transportation System Pilot Project Sponsor: Columbia. Principal goals are to assess survival and straying at adulthood. Net pens are proposed as a low cost

130

Project Information Form Project Title Assessment of Critical Barriers to Alternative and Renewable Fuel and  

E-Print Network (OSTI)

Project Information Form Project Title Assessment of Critical Barriers to Alternative and Renewable Fuel and Vehicle Deployment University UC Davis Principal Investigator Amy Jaffe Andrew Burke PI models are necessary to promote adequate investment in promising alternative vehicle technologies

California at Davis, University of

131

Project Information Form Project Title Integrating Management of Truck and Rail Systems in Los Angeles  

E-Print Network (OSTI)

Project Information Form Project Title Integrating Management of Truck and Rail Systems in Los or organization) Volvo Research and Educational Foundation- $79,604.00 Total Project Cost $79,604.00 Agency ID of Research Project This project will develop models to optimize the balance of freight demand across rail

California at Davis, University of

132

Project Information Form Project Title Spatial Dynamics of the Logistics Industry and Implications for Freight  

E-Print Network (OSTI)

or organization) Caltrans $50,000 Total Project Cost $50,000 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Spatial Dynamics of the Logistics Industry and Implications and End Dates August 15, 2014 to August 14 2015 Brief Description of Research Project This project

California at Davis, University of

133

Name Title of Project Site Supervisor and  

E-Print Network (OSTI)

in Yolo County's Department of Public Health Hoa Tan, Program Director, Emergency Preparedness, Yolo Community Health Assessment Project Jill Cook, MS, RN, PHN, Director of Health, Yolo County Health Department 500 Jefferson Blvd. West Sacramento, CA 95691 (916) 375-6380 jill.cook@yolo county.org BK Yoo, MD

Leistikow, Bruce N.

134

Project Information Form Project Title White Paper on Climate Adaptation for State DOTs and Local Agencies  

E-Print Network (OSTI)

Project Information Form Project Title White Paper on Climate Adaptation for State DOTs and Local each agency or organization) DOT $30,000 Total Project Cost $30,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates January 2014 to December 2014 Brief Description of Research Project

California at Davis, University of

135

Project Information Form Project Title White Paper on The application of permeable pavement with emphasis  

E-Print Network (OSTI)

Project Information Form Project Title White Paper on The application of permeable pavement (by each agency or organization) Cal Trans Total Project Cost $29,007 Agency ID or Contract Number Project Depending on the type of surface pavement, permeable pavement can be termed as porous asphalt

California at Davis, University of

136

Project Title Improved Emission Models for Project Evaluation (MOVES-Matrix) University Georgia Institute of Technology  

E-Print Network (OSTI)

Project Title Improved Emission Models for Project Evaluation (MOVES-Matrix) University Georgia or organization) DOT - $92,292.15 Total Project Cost $92,292.15 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates November 2013 - June 2015 Brief Description of Research Project Local governments are using

California at Davis, University of

137

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road  

E-Print Network (OSTI)

Project Information Form Project Title Reduction of Lifecycle Green House Gas Emissions From Road@ucdavis.edu Funding Source(s) and Amounts Provided (by each agency or organization) US DOT $30,000 Total Project Cost Brief Description of Research Project This white paper will summarize the state of knowledge and state

California at Davis, University of

138

Project Information Form Project Title Impact of Legislative Mandates on Transportation Workforce Capacity  

E-Print Network (OSTI)

or organization) DOT $95,000 Total Project Cost $95,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and EndProject Information Form Project Title Impact of Legislative Mandates on Transportation Workforce Dates August 1, 2014 to July 31, 2015 Brief Description of Research Project The transportation industry

California at Davis, University of

139

Project Information Form Project Title Accelerating Commercialization of Alternative and Renewable Fuels and  

E-Print Network (OSTI)

or organization) CEC $344,546 Total Project Cost $344,546 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Accelerating Commercialization of Alternative and Renewable and End Dates June 30, 2014 to June 30, 2016 Brief Description of Research Project Alternative

California at Davis, University of

140

Project Information Form Project Title Exploring Unintended Environmental and SocialEquity Consequences of  

E-Print Network (OSTI)

Source(s) and Amounts Provided (by each agency or organization) Caltrans $91,829 Total Project Cost $92Project Information Form Project Title Exploring Unintended Environmental and Social Brief Description of Research Project Communities throughout the U.S. are pursuing land use

California at Davis, University of

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Project Information Form Project Title Using Connected Vehicle Technology for Advanced Signal Control  

E-Print Network (OSTI)

,387 Total Project Cost $59,387 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates 4/14/2014 ­ 9Project Information Form Project Title Using Connected Vehicle Technology for Advanced Signal/30/15 Brief Description of Research Project Today's conventional traffic control strategies typically rely

California at Davis, University of

142

Project Information Form Project Title Designing and Analyzing Policies for Renewable Fuels  

E-Print Network (OSTI)

or organization) US DOT $38,942 Total Project Cost $38,942 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Designing and Analyzing Policies for Renewable Fuels and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Federal and state

California at Davis, University of

143

Project Information Form Project Title Designing and Analyzing Policies for Renewable Fuels  

E-Print Network (OSTI)

or organization) US DOT $38,925 Total Project Cost $38,925 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title Designing and Analyzing Policies for Renewable Fuels and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Federal and state

California at Davis, University of

144

Project Information Form Project Title The Role of Environmental Concerns, Lifestyles, Mobility-Related  

E-Print Network (OSTI)

(s) and Amounts Provided (by each agency or organization) Cal Trans $92,070.27 Total Project Cost $92Project Information Form Project Title The Role of Environmental Concerns, Lifestyles, Mobility Brief Description of Research Project Recent research has highlighted significant modifications

California at Davis, University of

145

Project Information Form Project Title White Paper on Performance Based Approaches to Incentivize Local Adoption of  

E-Print Network (OSTI)

Provided (by each agency or organization) Caltrans $23,385 Total Project Cost $23,385 Agency ID or ContractProject Information Form Project Title White Paper on Performance Based Approaches to Incentivize of Research Project This white paper will consider how to incentivize local government adoption of land use

California at Davis, University of

146

Project Information Form Project Title Intercity Travel in Northeaster Non-metropolitan Regions: What Roles do  

E-Print Network (OSTI)

) USDOT $73,000 Total Project Cost $73,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End DatesProject Information Form Project Title Intercity Travel in Northeaster Non-metropolitan Regions September 2014 to August 2016 Brief Description of Research Project Little is known about intercity travel

California at Davis, University of

147

Project Information Form Project Title Innovative Data Collection to Improve Transit Service Assessment  

E-Print Network (OSTI)

(s) and Amounts Provided (by each agency or organization) DOT - $102,971.57 Total Project Cost $102,971.57 AgencyProject Information Form Project Title Innovative Data Collection to Improve Transit Service of Research Project Mobile information technology will be used to compare travel behavior of populations

California at Davis, University of

148

Project Information Form Project Title Eco-Driving to Reduce Emissions Cars (Behavioral Focus)  

E-Print Network (OSTI)

Source(s) and Amounts Provided (by each agency or organization) USDOT $34,618.33 Total Project Cost $34Project Information Form Project Title Eco-Driving to Reduce Emissions ­ Cars (Behavioral Focus Description of Research Project The purpose of this review is to provide energy and environment policy makers

California at Davis, University of

149

Project Information Form Project Title Intercity Travel in Northeastern Non-metropolitan Regions: What Roles do  

E-Print Network (OSTI)

) USDOT $73,000 Total Project Cost $73,000 Agency ID or Contract Number DTRT13-G-UTC29 Start and End DatesProject Information Form Project Title Intercity Travel in Northeastern Non-metropolitan Regions September 2014 to August 2016 Brief Description of Research Project Little is known about intercity travel

California at Davis, University of

150

Project Information Form Project Title Working toward a policy framework for reducing greenhouse gas  

E-Print Network (OSTI)

Provided (by each agency or organization) US DOT $37,874 Total Project Cost $37,874 Agency ID or ContractProject Information Form Project Title Working toward a policy framework for reducing greenhouse of Research Project This white paper is concerned with a preliminary investigation of the extent to which

California at Davis, University of

151

Project Information Form Project Title Advanced Energy Management Strategy Development for Plug-in Hybrid  

E-Print Network (OSTI)

,365 Total Project Cost $58,365 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates April 1, 2014Project Information Form Project Title Advanced Energy Management Strategy Development for Plug ­ September 30, 2015 Brief Description of Research Project Plug-in hybrid vehicles (PHEVs) have great

California at Davis, University of

152

Project Information Form Project Title White Paper of Assessing Transportation Financing Options from a Green  

E-Print Network (OSTI)

or organization) US DOT $23,700 Total Project Cost $23,700 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title White Paper of Assessing Transportation Financing Options and End Dates June 15, 2014 to August 31, 2014 Brief Description of Research Project The Highway Trust

California at Davis, University of

153

Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle-Based  

E-Print Network (OSTI)

,931.44 Total Project Cost $98,931.44 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates November 1Project Information Form Project Title Program for Vehicle Regulatory Reform: Assessing Life Cycle, 2014 ­ October 31, 2015 Brief Description of Research Project Current greenhouse gas emissions

California at Davis, University of

154

Project Information Form Project Title Managing Roadway Systems to Reduce GHG Emissions and Improve  

E-Print Network (OSTI)

or organization) $25,217 Total Project Cost $25,217 Agency ID or Contract Number DTRT13-G-UTC29 Start and EndProject Information Form Project Title Managing Roadway Systems to Reduce GHG Emissions and Improve Dates 4/1/14 ­ 3/30/15 Brief Description of Research Project There have been a variety of traffic

California at Davis, University of

155

Project Information Form Project Title Reducing Truck Emissions and Improving Truck Fuel Economy via ITS  

E-Print Network (OSTI)

each agency or organization) US DOT $90,000 Total Project Cost $90,000 Agency ID or Contract NumberProject Information Form Project Title Reducing Truck Emissions and Improving Truck Fuel Economy Project Currently trucks are viewed as any other vehicle in traffic management Currently trucks are viewed

California at Davis, University of

156

Project Information Form Project Title Urban Spatial Structure and GHG Emissions  

E-Print Network (OSTI)

Source(s) and Amounts Provided (by each agency or organization) Caltrans $79,375 Total Project Cost $79Project Information Form Project Title Urban Spatial Structure and GHG Emissions University USC Brief Description of Research Project The evidence on land use and travel shows that employment access

California at Davis, University of

157

Project Title and Principal Investigators FY 2014 Federal  

E-Print Network (OSTI)

Sea Grant Program Project Title and Principal Investigators FY 2014 Federal Funding * FY 2014, NY, RI, WHOI Buy Out or Build Back? A Comparative Assessment of Approaches to Employing Public Stewards Academies in Maryland (Dana R. Fisher) $69,999 $35,007 MI Development of Stable Open Channel

158

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

159

NEPA COMPLIANCE SURVEY Project Information Project Title: Liner Drilling Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Liner Drilling Date: Liner Drilling Date: 4-5-10 DOE Code: 71092 Cont ractor Code: 8067-766 Project Lead: Frank Ingham Project Overview Nothing out of the ordinary for drilling an existing location 1. What are the environmental impacts? NE SW Sec 21 , T39N, R78W (45-3-X-21 well) 2. What is the legal location? 3. What is the duration of the project? Approximately a week 4 . What major equipment will be used if any (work over rig, drilling rig, Drilling Rig etc.)? Will Drill out of 9 5/8 caslng with liner drillng assembly. After drilling approximately 750 to 1000 ft, will test liner hanging assembly set and retrieve multiple times. The table b elow is to be completed by the Project Lead and reviewed by the Environmental Specialis t and the DOE NEPA Compliance Officer. NOTE: If Change of Scope occurs, Project Lead must submit a new NEPA Compliance Survey a

160

NEPA COMPLIANCE SURVEY Project Information Project Title: Express Stack Tools  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Express Stack Tools Express Stack Tools Date: 11/16/2010 DOE Code: 6730.020.81023 Contractor Code: 8067-971 Project Lead: Brian Black Project Overview 1) This project will test open and cased Hole logging tools in multiple wells. The tools to be testied include: 1. Brief project description [include anything that could impact the natural gamma, borehole temperature, compensated neutron, compensated density with PE, dual environment] induction/short guard, neutron prompt gamma, and acoustic televiewer tool. Radioactive sources will be run in the well as part of the toolstring. 2. Legal location 3. Duration of the project 2) 48-X-28 well location, SE %, SW %, Tsp 39N Rng 78W, Section 28; 45::3-X-21 well location, NE %, SW 4. Major equipment to be used %, Tsp 39N, Rng 78W, Section 21; 46-TpX-10 well location, NE %, SW Y.., Tsp38N, Rng 78W, Section 10.

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure to Accommodate  

E-Print Network (OSTI)

Project Information Form Project Title Potential to Build Current Natural Gas Infrastructure Project Natural gas is often touted as a `bridge' to low carbon fuels in the heavy duty transportation sector, and the number of natural gas-fueled medium and heavy-duty fleets is growing rapidly. Research

California at Davis, University of

162

Project Information Form Project Title Routing Strategies for Efficient Deployment of Alt. Fuel Vehicles for  

E-Print Network (OSTI)

agency or organization) US DOT $90,000 Total Project Cost $90,000 Agency ID or Contract Number DTRT13-GProject Information Form Project Title Routing Strategies for Efficient Deployment of Alt. Fuel-UTC29 Start and End Dates May 16, 2014 to May 31, 2015 Brief Description of Research Project

California at Davis, University of

163

Project Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt Pavement (RAP),  

E-Print Network (OSTI)

(s) and Amounts Provided (by each agency or organization) Caltrans $90,315 Total Project Cost $90,315 Agency IDProject Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt of Research Project As virgin material sources become increasingly scarce, and the volume of pavement material

California at Davis, University of

164

Project Information Form Project Title Environmentally Friendly Driving Feedback Systems Research and  

E-Print Network (OSTI)

Provided (by each agency or organization) Caltrans $136,000 Total Project Cost $136,000 Agency IDProject Information Form Project Title Environmentally Friendly Driving Feedback Systems Research of Research Project Among several strategies to reduce fuel consumption and greenhouse gas emissions from

California at Davis, University of

165

Project Information Form Project Title Design and Analysis of Feebate Policies for Sustainable ZEV and Other  

E-Print Network (OSTI)

(s) and Amounts Provided (by each agency or organization) US DOT $36,442 Total Project Cost $36,442 Agency IDProject Information Form Project Title Design and Analysis of Feebate Policies for Sustainable ZEV of Research Project Zero-emission vehicles (ZEVs) are expected to play a critical role in decarbonizing light

California at Davis, University of

166

Project Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt Pavement (RAP),  

E-Print Network (OSTI)

(s) and Amounts Provided (by each agency or organization) Caltrans $90,538 Total Project Cost $90,538 Agency IDProject Information Form Project Title Evaluation of the Combined Effect of Recycled Asphalt of Research Project As virgin material sources become increasingly scarce, and the volume of pavement material

California at Davis, University of

167

Project Information Form Project Title Exploring Unintended Environmental and Social-Equity Consequences of  

E-Print Network (OSTI)

to simulate the effect of plans on rents, location of low income households, and travel (mode, trips, autoProject Information Form Project Title Exploring Unintended Environmental and Social and End Dates September 1, 2014 to August 31, 2015 Brief Description of Research Project Communities

California at Davis, University of

168

NEPA COMPLIANCE SURVEY Project Information Project Title: Casing Drilling Test  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Casing Drilling Test Casing Drilling Test Date: 5-17-201 1 DOE Code: 6730-020-72000 Contractor Code: 8067-806 Project Lead: Marl< Duletsky Project Overview 1, Brief project description ~nclude The existing 13-1-SX-23 location and entry road will be reworlproject 4. Major equipment to be used

169

Project title: Cottonwood-Roseville Optical Groundwire Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cottonwood-Roseville Optical Groundwire Project Cottonwood-Roseville Optical Groundwire Project Requested By: Joe Oloriz Mail Code: N5706 Phone: 916-353-4773 Date Submitted: 7-3-13 Date Required: 7-8-13 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, switchyards, and facilities throughout California. Western must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. The process of marketing and delivering electric power through transmission facilities requires a great

170

Project Information Form Project Title The Development of Lifecycle Data for Hydrogen Fuel Production and  

E-Print Network (OSTI)

Project Information Form Project Title The Development of Lifecycle Data for Hydrogen Fuel will be technologies and fuels related to renewable hydrogen. The literature review will produce a set of hydrogen hydrogen or hydrogen produced with technologies or fuels not currently in the LCFS. The study will assess

California at Davis, University of

171

RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

', ', , , 1'.1 'Pagf;: 1 of 2 RECIPIENT:Bowling Green State University STATE: OH PROJECT TITLE: Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number COP DE-EE0003871 GFO-0003871-001 EE3871 Based on my review oftlle information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.IA), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

172

TITLE: HVAC TESTING & BALANCING FOR MAJOR AND MINOR PROJECTS OBJECTIVE AND  

E-Print Network (OSTI)

TITLE: HVAC TESTING & BALANCING FOR MAJOR AND MINOR PROJECTS OBJECTIVE AND PURPOSE: To provide an independent test & balance for the adjustment of all HVAC systems in all major projects and minor projects

Fernandez, Eduardo

173

RECIPIENT:Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chesterfield County Chesterfield County PROJECT TITLE: EECBG Lighting Retrofit Page 1 of2 STATE: VA Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000013 DE-EE0000874 GFO-0000874-001 0 Based 011 my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

174

RECIPIENT:Utah County STATE: UT PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utah County STATE: UT Utah County STATE: UT PROJECT TITLE: EECBG - Utah County Energy Efficiency Retrofits Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-OOOOO13 EEOOOO889 GFO-O000889-002 EEO Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: Cx, EA, EIS APPENDIX AND NUMBER: Description: A11 Technical advice and planning assistance to international, national, state, and local organizations. A9 Information gathering (including, but not limited to, literature surveys, Inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

175

RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: : Page 1 01 :L RECIPIENT:Hull Municipal Light Plant STATE: MA PROJECT TITLE: Hull Offshore Wind Research and Development Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number 09EE0000326 DE-EE0000326 GFO-OO00326-001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution; and

176

Standard Operating Procedure (SOP) for (title of project, experiment, reaction or process) Date of Preparation: ____________________________  

E-Print Network (OSTI)

Standard Operating Procedure (SOP) for (title of project, experiment, reaction or process and ensuring that this procedure is carried out: _________________________________________________ HEALTH

Sura, Philip

177

Project Information Form Project Title Bicyclist Behavior in San Francisco: A Before-and-After Study of the  

E-Print Network (OSTI)

Project Information Form Project Title Bicyclist Behavior in San Francisco: A Before(s) and Amounts Provided (by each agency or organization) Caltrans $56,707 Total Project Cost $56,707 Agency ID of Research Project Many cities in California are investing bicycle infrastructure as a way to increase

California at Davis, University of

178

Project Information Form Project Title White Paper on the Future of Passenger Travel Demand in the United  

E-Print Network (OSTI)

each agency or organization) Caltrans $26,383 Total Project Cost $26,383 Agency ID or Contract NumberProject Information Form Project Title White Paper on the Future of Passenger Travel Demand DTRT13-G-UTC29 Start and End Dates September 2014 to June 2015 Brief Description of Research Project

California at Davis, University of

179

Project Information Form Project Title Do California Highways Act as Barriers to Gene Flow for Ground-Dwelling  

E-Print Network (OSTI)

(by each agency or organization) Caltrans $78,395 Total Project Cost $78,395 Agency ID or ContractProject Information Form Project Title Do California Highways Act as Barriers to Gene Flow of Research Project Roads can act as significant barriers to wildlife dispersal, creating small fragmented

California at Davis, University of

180

Project Information Form Project Title White Paper on the Future of Passenger Travel Demand in the United  

E-Print Network (OSTI)

each agency or organization) DOT $26,383.66 Total Project Cost $26,383.66 Agency ID or Contract NumberProject Information Form Project Title White Paper on the Future of Passenger Travel Demand Project This white paper will summarize recent research findings pertaining to future passenger travel

California at Davis, University of

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Project Information Form Project Title White Paper on the Effectiveness of Land Use and Demand Strategies in  

E-Print Network (OSTI)

DOT $12,000 Cal Trans Total Project Cost $42,533 Agency ID or Contract Number DTRT13-G-UTC29 StartProject Information Form Project Title White Paper on the Effectiveness of Land Use and Demand and End Dates June 30, 2014 to January 30, 2015 Brief Description of Research Project Reducing vehicle

California at Davis, University of

182

RECIPIENT:EES I PROJECT TITLE u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EES EES I PROJECT TITLE : u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION Tennessee Energy Efficient Schools Initiative Ground Source Heat Pump Page 1 of2 ~ ~~ STATE: TN Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE·FOA-EEOOOO116 DE-EEOOO3007 GFO..QOO3007-OO3 0 Based on my review o(tbe informafioD concerning the proposed actioD, as NEPA Compliance Officer (authorized under DOE Order-451.1A),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including , but nollimited 10, literature surveys, inventories, audits), data analysis (including computer modeling). document preparation (such as conceptual design or feasibility studies, analytical energy supply

183

PROJECT TITLE: EECBG u.s. DEPARIIIIENI OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plano Plano PROJECT TITLE: EECBG u.s. DEPARIIIIENI OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DEIERlIlINAIION Page 1 of2 STATE: TX Funding Opportunity ADDoum::tmtnt Number PrO(urtment Instrument Number NEPA Control Number em Numbu DE·FQA-OOOOQ13 DE-EE0000969 0 Based on my review orlbe information concuning the proposed action, as N[PA Compliance Officer (authorized under DOE Order 4SI.IA), I bave made the rollowing ddtnnination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits). data analysis (including computer modeling). document preparation (such as conceptual deSign or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

184

www.arts.canterbury.ac.nz/internships Project Title: Health, History and Digital  

E-Print Network (OSTI)

project on the history of unfree labour in the Pacific. The intern will link the database to other onlinewww.arts.canterbury.ac.nz/internships Project Title: Health, History and Digital Humanities: The project explores the health history of indentured labourers in Fiji. The intern will digitise microfilm

Hickman, Mark

185

Title: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi  

E-Print Network (OSTI)

Title: CEL Solar Photovoltaic Power Project in El Salvador Principal Investigator: Abbas Ghassemi solar resource, studying different technology options, anticipating performance, and evaluating the economics of the solar power technologies. The NMSU team is evaluating the potential environmental impacts

Johnson, Eric E.

186

Department of Industrial Engineering Spring 2010 Project Title: Angel Wings Bicycle Seat  

E-Print Network (OSTI)

PENNSTATE Department of Industrial Engineering Spring 2010 Project Title: Angel Wings Bicycle Seat Overview The Angel Wings Bicycle Seat is the only two padded bike seat that moves with rides with the rider

Demirel, Melik C.

187

TITLE  

Office of Legacy Management (LM)

Mi Mi w u United S taies Office of Radiation a ~ d EPA 8 Environmental Protection Indoor Air Dcccmbcr 1999 Q Agency Washington, DC 304hC) EPA-402-R-93-0 12 Q w 0 4 : 0 0 0 4 &€PA Annual Water Samp and Analysis Ca endar Year 1999: RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area Annual Water Sampling and Analysis, Calendar Year 1999 RULISON Test Site Area RIO BLANCO Test Site Area FAULTLESS Test Site Area SHOAL Test Site Area GASBUGGY Test Site Area GNOME Test Site Area by Max G. Davis Prepared for the U.S. Department of Energy under Interagency Agreement DE-AIO8-96NVl1969 FL4DIATION AND INDOOR ENVIRONMENTS NATIONAL LABORATORY OFFICE OF RADIATION AND INDOOR AIR

188

Title I design summary report, initial tank retrieval systems, project W-211  

SciTech Connect

This document provides the Title I (preliminary) design for the Tank 241-SY-101 (101-SY) retrieval system. The design reflects an integrated retrieval approach for 101-SY, whereby the existing mitigation pump will be used to mix the waste and Project W-211 will provide for waste removal. The Title I Design Summary Report includes narrative and sketches that describe the technical aspect of the project, as well as updated cost and schedule baselines for the 101-SY retrieval system.

Rieck, C.A.

1995-03-01T23:59:59.000Z

189

The following National Sea Grant aquaculture research projects were awarded in FY2010-Program Investigator Investigator Affiliation Project Title  

E-Print Network (OSTI)

The following National Sea Grant aquaculture research projects were awarded in FY2010- 2011: Sea Grant College Program Investigator Investigator Affiliation Project Title FY 10-11 Federal Share* Alaska Sea Grant Eckert University of Alaska Fairbanks Red King Crab Aquaculture in Alaska - Release

190

HQ State HQ City Name of Primary Selectee Project Type Project Title and Brief Project Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Total Project Value Total Project Value Including Cost Share AZ Fort Defiance Navajo Tribal Utility Authority Company Smart Grid Workforce Training (Topic B) Navajo Tribal Utility Authority Smart Grid Workforce Training Program - Develop a workforce that is well-trained and committed to the mission of modernizing NTUA's distribution services, including an expeditious and well- built smart grid system. The training program is designed to maximize employment opportunities for citizens of the Navajo Nation located on the reservation. Arizona New Mexico $704,486 $1,408,971 $704,486 $1,408,971 Glendale Glendale Community College Developing and Enhancing Workforce Training Programs (Topic A) Southern California Utility Initiative - Expand training curricula and programs in the Southern California region. The project will raise awareness and

191

Title of Project: Scoping Data Access and Integration Needs to Facilitate Better Management of Research Innovation  

E-Print Network (OSTI)

Title of Project: Scoping Data Access and Integration Needs to Facilitate Better Management-Madison Participants: P.S. Sriraj, Paul Metaxatos, Piyushimita (Vonu) Thakuriah Status: Active Objective: This project of the intended use and value of these databases. 3. Identify existing access procedures to WisDOT databases

Illinois at Chicago, University of

192

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests: landscape patterns and the  

E-Print Network (OSTI)

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests@uwyo.edu William H. Romme Colorado State University Dept. of Forest, Rangeland, and Watershed Stewardship, Fort-Kind and Financial Contributions: $242,868 Abstract: Our project addresses Task 1 in AFP 2006-2. Wildfire and bark

Turner, Monica G.

193

Project Title: Complete System-Level Efficient and Interoperable...  

Office of Environmental Management (EM)

and architecture since a microgrid will be likely upgraded from an existing system. 2014 Smart Grid R&D Program Peer Review Project Summary 2 2014 Smart Grid R&D Program Peer...

194

Project Title: SPANA A Multimedia Tool for Learning Speech Analysis  

E-Print Network (OSTI)

valuable advice on programming techniques and useful materials on handling this project. He also took care crossing measurements, a diagram with both average energy and zero crossing rate of the speech signal

Mak, Man-Wai

195

HQ State HQ City Name of Primary Selectee Project Type Project Title and Brief Project Description  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Participant Participant Share Total Project Value Including Cost Share AZ Fort Defiance Navajo Tribal Utility Authority Company Smart Grid Workforce Training (Topic B) Navajo Tribal Utility Authority Smart Grid Workforce Training Program - Develop a workforce that is well-trained and committed to the mission of modernizing NTUA's distribution services, including an expeditious and well-built smart grid system. The training program is designed to maximize employment opportunities for citizens of the Navajo Nation located on the reservation. Arizona New Mexico $704,486 $704,486 $1,408,972 $704,486 $704,486 $1,408,972 Glendale Glendale Community College Developing and Enhancing Workforce Training Programs (Topic A) Southern California Utility Initiative - Expand training curricula and

196

TITLE  

Office of Legacy Management (LM)

. . . . . . . . . . . . . . . -, , / AMC 000102 ( Nevada DOE/NV--1106-REV. 1 1 Environmental Restoration Project Subsurface Completion Report for Amchitka Underground Nuclear Test Sites: Long Shot, Milrow, and Cannikin Revision No.: 1 September 2006 Approved for public release: further dissemination unlimited Environmental Restoration Project U.S. Department Of Energy National Nuclear Securlty Administration Nevada Sile OMW i - Available for public sale, in p a p from: U.S. Department of Commerce National Technical Information Service 5285 Poa Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Ernail: prdtr$@ntis.gov Online ordering: htto:/hvww.n~~.~ov/ordenn~.htm Available electronically at htt~://www.osti.rov/hrid~e Available for a processing fee to U.S. Department of Energy and its contractors,

197

TITLE  

Office of Legacy Management (LM)

CULTURAL RESOURCES STUDY CULTURAL RESOURCES STUDY BACKQROUND RESEARCH REPORT Off-NfS Cukural Rasowcmr Studks: Background Research for Project Shot11 Prepared by Maureen King Alvin R. McLane and William Gray Johnson MAY 1993 DESERT RESEARCH INSTITUTE CULTURAL RESOURCES STUDY BACKGROUND RESEARCH REPORT Off-NTS Cultural Resources Studies: Background Research for Project Shoal Prepared by Maureen King Alvin R. McLane and William Gray Johnson Prepared for the U.S. Department of Energy Nevada Field Office Las Vegas, Nevada This document is UNCLASSIFIED Derivative , , ::/>.: ; , . / I : Classifier - & ? " A . + - = / . /.. Desert Research Institute ate.:^^:,'& MAY 1993 The work upon which this report is based was supporred by the U.S. Department of h e r g y under Contract #DE-AC08-90NV10845

198

title  

NLE Websites -- All DOE Office Websites (Extended Search)

April 21, 2003 April 21, 2003 April 21, 2003 Bakul Banerjee Bakul Banerjee Project Engineer Project Engineer MOU/SOW MOU/SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW NEU MOU and FY03 SOW are waiting for Mont's signature. SOW contains work for three engineers. contains work for three engineers. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Princeton FY03 SOW and Caltech FY03 SOW were signed in March. Caltech FY03 SOW and MOU will be modified to include T2 Caltech FY03 SOW and MOU will be modified to include T2 operations work after UCSD and UFL MOUs are approved. operations work after UCSD and UFL MOUs are approved. UCDavis UCDavis FY03SOW was signed by Dr. Ko and waiting for FY03SOW was signed by Dr. Ko and waiting for Bauerdick

199

Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Site Map Home Publications Software Facilities Links Staff Glazing Materials Chromogenics LowE and Spectrally Selective Deposition Processes Characterization New Materials Advanced Systems Superwindows Integrated Window Systems Gas-Filled Panels Window Properties Infrared Laboratory and Traversing System MoWiTT Window+5 Development Therm Development Film Coefficients Condensation Resistance Comfort Models Field Measurements LBNL Role in NFRC Optics Database Daylighting IEA Task 21 Lightshelves/Lightpipes Tools for Daylighting Prediction Demonstrations Daylighting Controls Residential Performance Energy Star ResFen Development ECW Demonstrations Annual Energy Rating Field Tests and Monitoring Projects

200

TITLE  

Office of Legacy Management (LM)

2 Velma Avenue 2 Velma Avenue Columbus, 0h.o 4321 1-2497 6141297-2300 Fax: 297-241 1 OH I 0 HISTORICAL SOCIETY SlSCE 1885 February 23, 1996 David G. Adler, Site Manager F o m r Sites Restoration Division Department of Energy Oak Ridge Operations Office P.O. 80x 200T Oak Ridge, Tennessee 37831 -8723 Dear Mr. Adler: Re: 8 8 T Metal Building, Columbus, Ohio This is in response to your correspondence, received on February 22, 1996, regarding the project noted above. My staff has reviewed carefully the information provided. Based on the description of the proposed work and photographs provided, it is my opinion that the proposed work, if completed as proposed, will have no effect on the integrity of the B 8 T Metal building, which is eligible for the National Register of Historic Places under Criterion C. No further coordination with

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development on the Population Biology  

E-Print Network (OSTI)

Collaborative Abby Arnold, Executive Director, American Wind Wildlife Institute,aarnold@awwi.org, 202- 535-7800 (x105) Taber D. Allison, Director of Research and Evaluation, American Wind Wildlife Institutei FINAL TECHNICAL REPORT Project Title: Environmental Impacts of Wind Power Development

Sandercock, Brett K.

202

Title: Use of Physical Barriers to Prevent Borer Infestation of Apple Burrknots Project Leaders  

E-Print Network (OSTI)

Title: Use of Physical Barriers to Prevent Borer Infestation of Apple Burrknots Project Leaders of burrknot tissue on apple dwarfing rootstocks is an increasing problem throughout the northeast. One into the winter. We also discuss economic considerations. Background and Justification: Apple growers

Agnello, Arthur M.

203

TITLE  

Office of Legacy Management (LM)

Corporare Center Corporare Center f 5 1 Lalayerre Drive P.O. Box 350 Oak Ridge. Tennewt 3783 1.0350 Facsimile: 1 6 1 5 1 220.2 100 ~ o b No. 14501, FUSRAP Project DOE Contract NO. DE-AC05-9 10R2 194 9 Code: 7340/WBS: 135 U.S. Department of Energy Oak Ridge Field Office P . O . BOX 2001 Oak Ridge, Tennessee 37831-8723 Attention: David G. hdler, Site Manager , Former Sites Restoration Division subject: Hazard Assessment for Residual Contaminztion at the Former Associate Aircraft S i t e ' ( P 2 S ) Dear Mr. Adler: Based on sample results obtained a t A4S, uranium-238 concentrations above the site specific criteria (35 pCi/g) were found in a small sub-slab srsa in Section 1 of the former AAS building. The sample results of the location indicated radioactive contamination at a maximum concentration of 134 pci/g. T

204

Project Title: Translating Solanaceae Sequence Diversity and Trait Variation into Applied Outcomes through Integrative Research, Education, and Extension  

E-Print Network (OSTI)

Project Title: Translating Solanaceae Sequence Diversity and Trait Variation into Applied Outcomes. Project Director: David Douches (douchesd@msu.edu), Michigan State University Co-Directors: Robin Buell@hort.oregonstate.edu), Oregon State University Project Website: http://solcap.msu.edu The SolCAP project was initiated September

Douches, David S.

205

Application for CALS-CCE 2013 Summer Internship Title of project: Communicating Climate Change to New Yorkers  

E-Print Network (OSTI)

Application for CALS-CCE 2013 Summer Internship Title of project: Communicating Climate Change County Project summary and intended outcomes (no more than 5-10 sentences): Cornell Climate Change): The intern will support the Cornell climate change project by working to develop outreach materials

Keinan, Alon

206

Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling with the coupled THM code FEHM  

Energy.gov (U.S. Department of Energy (DOE))

Project title: Stimulation at Desert Peak and Bradys reservoirs: modeling with the coupled THM code FEHM presentation at the April 2013 peer review meeting held in Denver, Colorado.

207

NEPA COMPLIANCE SURVEY Project Information Project Title: South Compost Facility #2 Da  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

South Compost Facility #2 Da South Compost Facility #2 Da te: 1-6-10 DOE Code: 6730.020.0000 Contracto r Code: 8067-788 Project Lead: Anthony Bowler Project Ove rview The purpose of the project is to build an additional compos ling facility at RMOTC to allow for 1. Bnef project description [include anything that increased soil remediation capabilities. The project will involve removing the top soil and placing could impact the environment] it adjacent to the operational area ,in a "signed" pile for reclamation . Additional scraping of the 2. Legal location area (6"-8'1 will generate material which will be used to erect a 2' berm around the location to 3. Duration of the project control runon/runoff. A perimeter fence and a locking gate will be installed around the facility's

208

Project Information Form Project Title Strategies for Transitioning to Zero-Emission Vehicles--Freight  

E-Print Network (OSTI)

,884 Agency ID or Contract Number DTRT13-G-UTC29 Start and End Dates June 1, 2014 � August 15, 2014 Brief Description of Research Project According to the EIA, freight modes accounted for 29% of transportation fuel, not anticipated) Web Links Reports Project website http://ncst.ucdavis.edu/white-paper/ucd-dot-wp3-1b #12;

California at Davis, University of

209

NEPA COMPLIANCE SURVEY Project Information Project Title: T-2-33  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-33 2-33 Date: 12-22-2010 DOE Code: Contractor Code: Project Lead: Bernard Winfree Project Overview 1. What are the environmental The existing manifold building will be moved off site. A backhoe will be used to dig up the manifold piping, impacts? after all possible fluids have been sucked out. Wells 88-ax-28, 17 -stx-27 and 18-stx-27 will be tied directly into the tank The remaining pipes will be cut off at the lowest point. At this time, a compos it sample of the 2. What is the legal location? surrounding soil soil will be taken . Any contaiminated soils will be hauled to the compost facility. When the 3. What is the duration of the project? samples come back under the established limits, the hole will be backfilled with native materials and the site

210

NEPA COMPLIANCE SURVEY Project Information Project Title: T-1-21 Restoration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-21 Restoration 1-21 Restoration Date: 12-22-2010 DOE Code: Contractor Code: Project Lead : Bernard Winfree Project Overview 1. What are the environmental The existing building will be removed from the site. A backhoe will be used to dig up the manifold piping, impacts? after all possible fluids have been sucked out of the piping. We will then cut off the pipes at the lowest 2. What is the legal location? possible point At this time a com posit soil sample will be taken of the area. When the samples come back under the established limits, we will backfill the hole with the existing materials and recontour the site to 3. What is the duration of the project? perexisting conditions. Reseeding will be initiated when the proper seed mix is established. This is an

211

RECIPIENT:NREL PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROJECT TITLE: ESIF Excavation Soil Stockpile; NREL Tracking No. 11-013 Page 1 of2 **...*... @-~ .. @ '"',. .. ~ STATE: CO Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number NREL-11-013 GOO Based on my review ufthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: DOE/EA· Final Supplement-II to Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's 1440·5·11 (NREL) South Table Mountain Complex (November 2009) DOE/EA· Final Site-Site Wide Environmental Assessment of the National Renewable Energy Laboratory's (NREL) South

212

Final Project Report for project titled "Fluoroalkylphosphonic-acid-based proton conductors"  

SciTech Connect

The overall objective of this research was to create new proton-conducting polymer electrolytes for use in energy conversion devices including hydrogen fuel cells that could operate at high temperatures (95-130 C) and under low relative humidity (< 50% RH) conditions. The new polymers were based on the fluoroalkylphosphonic and phosphinic acid (FPA) groups (see illustration below) which offer prospects for rapid proton transport by a proton-hopping mechanism similar to that which operates in phosphoric acid, a well-known proton-transporting electrolyte that is used in a class of hydrogen fuel cells that work well under the conditions noted above and are already commercially successful. The two specific project objectives were as follows: (1) synthesize and characterize new proton-conducting electrolytes based on the fluoroalkylphosphonic and phosphinic acid (FPA) functional groups; and (2) create and apply new computer models to study protonic conduction in FPA-based electrolytes. The project was successful in creating the desired polymer electrolytes and also a series of molecular model compounds which were used to study proton transport in FPA electrolytes in general. Computer models were created to study both structure and proton-transport dynamics in the electrolytes, particularly the molecular model compounds. Rapid proton transport by a hopping mechanism was found in many of the model compounds and correlations with transport rates with molecular structure were identified. Several polymeric analogs of FPA model compounds were prepared and studied, however FPA-based polymeric materials having very high protonic conductivities under either wet or dry conditions were not obtained. Several possible reasons for the failure of polymeric materials to exhibit the expected high protonic conductivities were identified, including a failure of the polymers to adopt the phase-separated secondary structure/morphology necessary for high proton conductivity, and an unexpected polymer crosslinking effect of acidic groups having two P-OH groups. The project has lent insight into how FPA groups transport protons in both liquid and polymeric forms, which provides guidance to future efforts to design and prepare future generations of proton-conducting polymer electrolytes for hydrogen fuel cells and other types of electrochemical energy conversion and storage devices.

Stephen Creager

2011-12-08T23:59:59.000Z

213

RECIPIENT:City of Ann Arbor PROJECT TITLE: Ann Arbor Wind Generator  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ann Arbor Ann Arbor PROJECT TITLE: Ann Arbor Wind Generator " ) STATE: MI Funding Opportunity Announcement Number ProcurementInstrument Number NEPA Control Number CID Number DE-EE0000447 GFO-0000447-001 0 Based on my review oCthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution; and

214

Program or Field Office: Project Title and I. D. No.: Locatio  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D. No.: Locatio n: U.S. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Acid Pond Property Disposition Near the Spook, Wyoming, Disposal Site. LM # 08-12. Spook, Wyoming Proposed Action or Project Description: The Spook disposal site is located in Converse County, Wyoming, about 32 miles north of Glenrock, and is managed as a Title I Uranium Mill Tailings Radiation Control Act site. The Acid Pond Parcel located just southwest of the disposal site, also known as Vicinity Property SK-001 S, is a previously disturbed area once considered part of the original footprint of the Spook site. This parcel is not associated with current disposal site operations. DOE proposes to disposition the 5.89-

215

TITLE XVII Application Process  

Energy.gov (U.S. Department of Energy (DOE))

The Title XVII Innovative Clean Energy Projects (Title XVII) loan program is currently accepting applications in response to open technology-specific solicitations.

216

2012 EL Project Title and Number: Model-Based Engineering Program Title: Systems Integration for Manufacturing and Construction  

E-Print Network (OSTI)

for Manufacturing and Construction Applications Principal Investigator: Joshua Lubell, 734 Project Staff Name Josh Lubell Robert Lipman Allison Barnard Feeney Simon Frechette Chris Brown Kenway Chen Albert Jones Craig

Perkins, Richard A.

217

Project Title Mobile Device Management. Team Pam Horne, Jolene King, Jim Lehman, Marcus Lill, Terry Schroeder, David Shaw  

E-Print Network (OSTI)

Project Title Mobile Device Management. Team Pam Horne, Jolene King, Jim Lehman, Marcus Lill, Terry and supporting mobile devices that access Purdue data and information. Hypothesis We anticipate there would be several advantages from providing a model of supporting mobile devices. These advantages would be in areas

218

Project Title: Functional Measures of Sea Turtle Hearing ONR Award No: N00014-02-1-0510  

E-Print Network (OSTI)

A t Project Title: Functional Measures of Sea Turtle Hearing ONR Award No: N00014 Moein Bartol Virginia Institute ofMarine Science ABSTRACT In this study, sea turtle hearing and species and physiologically by brainstem evoked potential techniques. Sea turtles employed in this work

219

IMPEE PhD Opportunity Project title: Cyber-physical Systems (CPS) for knowledge discovery, data exploration and human factors  

E-Print Network (OSTI)

IMPEE PhD Opportunity Project title: Cyber-physical Systems (CPS) for knowledge discovery, data exploration and human factors research Supervisor(s): T. Lim, J.M. Ritchie Abstract CPS is an engineering/augmented/mixed reality spaces. R&D interests include (but not limited to): Aural or narrative guidance for product design

Greenaway, Alan

220

Project Year Project Title  

E-Print Network (OSTI)

-friendly visualization tools, such as Google Sketchup, do not enable structural analysis. This makes it extremely

Gray, Jeffrey J.

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Category:Tampa, FL | Open Energy Information  

Open Energy Info (EERE)

Tampa, FL" Tampa, FL" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Tampa FL Florida Power & Light Co..png SVFullServiceRestauran... 77 KB SVHospital Tampa FL Florida Power & Light Co..png SVHospital Tampa FL Fl... 80 KB SVLargeHotel Tampa FL Florida Power & Light Co..png SVLargeHotel Tampa FL ... 77 KB SVLargeOffice Tampa FL Florida Power & Light Co..png SVLargeOffice Tampa FL... 76 KB SVMediumOffice Tampa FL Florida Power & Light Co..png SVMediumOffice Tampa F... 78 KB SVMidriseApartment Tampa FL Florida Power & Light Co..png SVMidriseApartment Tam... 78 KB SVOutPatient Tampa FL Florida Power & Light Co..png SVOutPatient Tampa FL ... 77 KB SVPrimarySchool Tampa FL Florida Power & Light Co..png SVPrimarySchool Tampa ...

222

Category:Miami, FL | Open Energy Information  

Open Energy Info (EERE)

Miami, FL" Miami, FL" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Miami FL Florida Power & Light Co..png SVFullServiceRestauran... 77 KB SVHospital Miami FL Florida Power & Light Co..png SVHospital Miami FL Fl... 80 KB SVLargeHotel Miami FL Florida Power & Light Co..png SVLargeHotel Miami FL ... 78 KB SVLargeOffice Miami FL Florida Power & Light Co..png SVLargeOffice Miami FL... 76 KB SVMediumOffice Miami FL Florida Power & Light Co..png SVMediumOffice Miami F... 79 KB SVMidriseApartment Miami FL Florida Power & Light Co..png SVMidriseApartment Mia... 78 KB SVOutPatient Miami FL Florida Power & Light Co..png SVOutPatient Miami FL ... 77 KB SVPrimarySchool Miami FL Florida Power & Light Co..png SVPrimarySchool Miami ...

223

US. DEPARTMENT OF ENERGY EE RE PROJ ECT MANAGEMENT CENTER NEPA DE'l'flU..nNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

!. !. US. DEPARTMENT OF ENERGY EE RE PROJ ECT MANAGEMENT CENTER NEPA DE'l'flU..nNATION Page 1 of2 RECIPIENT:Pineitas County Board of County Commissioners STATE: Fl PROJEc.T TITLE: Clearwater Campus District Cooling - Activity 3 Geothermal Test Bores Funding Opportunity Announ~ement Number DE-FOA-OOOOO13-000002 Procurement Instrument Number DE -EEOOOO795.003 NEPA Control Number GF0-0000795-003 cm Number G0795 Based on my review of the information ~oncerning the propos~ action, as NE PA Compliance Officer (authorized under DOE Order 451.IA), I have made t he following determination: ex, EA, [IS APPENDIX AND NUMBER: Description: 8 3. 1 Site characterizatio n .n. en vironmental monit oring A9 Information gathering, analysis, and

224

FL J. Smith, Jr.  

Office of Legacy Management (LM)

ct. B. Duillap ct. B. Duillap (THPJJs L. Kassel) FL J. Smith, Jr. c c Kelley from R. 1. Cook, Kslley from R. 1. Cook, J J cit cit In accordawe with Secret memorandum dated October , 1951 ta IA. E. In accordawe with Secret rwmorandnn dated October , 1951 ta IA. E. Qapletad Uranium for HAA and ML," we are Ylepletad Uranium for HAA and ML," we are obligated to fill the following orders obligated to fill the following orders North American Aviation North American Aviation . . One Inch roes One Inch roes a. Depleted U nrptalj U-235 content= 0.&9 f O.O& Meterial must be homogenemsj uniformity of assay, O&Q5%. : b. Diemeterc 0.99P (1( O.ooOn, - 0.003")j de-hrmd. YI E ,g C* pwh b" f1/32" Classification Cancelled d. Humber of rods: 1800

225

NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Number: 10 Number: NEPA REVIEW SCREENING FORM DOE/CX-00088 I. Project Title: CH2f"JHill Plateau Remediation Company - Cleanup Actions, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions. e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation Company (PRC) will be conducting cleanup actions on the Hanford Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 1021, B, CX B6.1 ''Cleanup actions". PRC Projects include all those identified Sections . 3 and J.l4 of the PRC Contract, DE-AC06-08RL14788. Small-scale, short-term cleanup actions, under RCRA, Atomic Energy Act, or other

226

Project Title: Carbon cycling at the landscape scale: the effect of changes in climate and fire frequency on age distribution, stand structure, and net ecosystem production.  

E-Print Network (OSTI)

Project Title: Carbon cycling at the landscape scale: the effect of changes in climate and fire: Our project addresses Task 1 in RFP 2003-1. Climate, fire (frequency and intensity), and forest@mhub.zoology.wisc.edu, 4 Tinker@uwyo.edu Duration of Project: 3 years Annual Funding Requested from the Joint Fire Science

Turner, Monica G.

227

PROJECT TITLE: Evaluation of Seed Boot and Furrow Opener Configurations for Optimizing Seed and Fertilizer Placement in Simultaneous, Single-Pass Operations with Air Drills under  

E-Print Network (OSTI)

Hr GRC 3 PROJECT TITLE: Evaluation of Seed Boot and Furrow Opener Configurations for Optimizing-seeded into spring wheat stubble at Havre in 2002 is presented in Table 1. The `Morris Gumbo Boot' was included

Maxwell, Bruce D.

228

PI Research Organisation Project Title NE/J024678/1 Dr Christopher Davis University of Reading Driving space weather forecasts with real data  

E-Print Network (OSTI)

Lead Grant Reference PI Research Organisation Project Title NE/J024678/1 Dr Christopher Davis Troposphere and the Routing of Aircraft (EXTRA)Professor Keith Shine University of Reading NE/J023760

229

Record of Decision; JEA Circulating Fluidized Bed Combustor Project, Jacksonville, Duval County, FL (DOE/EIS-0289) (12/7/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

614 614 Federal Register / Vol. 65, No. 236 / Thursday, December 7, 2000 / Notices Recordkeeping burden. OMB invites public comment. Dated: December 1, 2000. John Tressler, Leader Regulatory Information Management, Office of the Chief Information Officer. Office of Educational Research and Improvement Type of Review: New. Title: Education Longitudinal Study of 2002 (ELS 2002). Frequency: Annually. Affected Public: Not-for-profit institutions; State, Local, or Tribal Gov't, SEAs or LEAs. Reporting and Recordkeeping Hour Burden: Responses: 51,597. Burden Hours: 59,497. Abstract: Year 2001 field test of 50 schools in five states, students, parents, teachers, and librarians. The main study in Spring 2002 in all 50 states and District of Columbia will constitute the baseline of a longitudinal study of

230

No Slide Title | Department of Energy  

Energy Savers (EERE)

No Slide Title No Slide Title No Slide Title More Documents & Publications Slide 1 Earned Value Management System (EVMS) and Project Analysis Standard Operating Procedure (EPASOP)-...

231

Long-Term Surveillance Plan for the Sherwood Project (UMTRCA Title II) Reclamation Cell, Wellpinit, Washington, February 2001  

NLE Websites -- All DOE Office Websites (Extended Search)

and Maintenance Program and Maintenance Program Long-Term Surveillance Plan for the DOE Sherwood Project (UMTRCA Title II) Reclamation Cell Wellpinit, Washington February 2001 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work Performed Under DOE Contract Number DE-AC13-96GJ87335 Task Order Number MAC 01-06 Document Number S00204 DOE/Grand Junction Office Sherwood LTSP February 2001 Page iii Contents 1.0 Introduction............................................................................................................... 1-1 1.1 Purpose ..................................................................................................................... 1-1 1.2 Legal and Regulatory Requirements ........................................................................

232

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Are non-marine organic-rich shales suitable exploration targets?  

E-Print Network (OSTI)

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Are non-marine organic-rich shales suitable exploration targets? (EARTH-15-SR2) Host institution: University of Oxford Supervisor 1: Stuart Robinson Supervisor 2: Steve Hesselbo (University of Exeter) Project description: Shales

Henderson, Gideon

233

Project title: Phylogenetic Analysis of "New" Homeobox in the lineage leading to Humans Thehomebox genes are extremely interesting and central in the mechanisms establishing form in  

E-Print Network (OSTI)

Project title: Phylogenetic Analysis of "New" Homeobox in the lineage leading to Humans Thehomebox and challenging questions in case of fast initial progress. The core project will involve comparative genome these genes evolutionary. Peter Holland group has found 4 new genes in humans, by comparison to the mouse

Goldschmidt, Christina

234

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Evaluating the resilience of deepwater systems to recover from oil spills  

E-Print Network (OSTI)

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Evaluating the resilience of deepwater systems to recover from oil spills Host institution: Heriot-Watt University Gatliff (BGS), Jeffrey Polton (NOC), Alejandro Gallego and Eileen Bresnan (MSS). Project description: Oil

Henderson, Gideon

235

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

NLE Websites -- All DOE Office Websites (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56); the "Cultural Resources Management Plan" (DOERL-98-10), and other applicable guidance documents and...

236

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

NLE Websites -- All DOE Office Websites (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56; the "Cultural Resources Management Plan" (DOERL-98-10, and other applicable guidance documents and...

237

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

NLE Websites -- All DOE Office Websites (Extended Search)

Project and Cold War Era Historic District Treatment Plan" (DOERL-97-56); the "Cultural Resources Management Plan" (DOERL-98-10), and other applicable guidance documents and...

238

Title 16 U.S.C. 1278(a) Restrictions on Water Resources Projects...  

Open Energy Info (EERE)

not grant any license for construction of any dam, water conduit, reservoir, powerhouse, transmission line, or other project works under the Federal Power Act on or directly...

239

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, Rev 1 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2014 II. Project...

240

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

NLE Websites -- All DOE Office Websites (Extended Search)

2 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2015. II. Project...

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document...  

NLE Websites -- All DOE Office Websites (Extended Search)

1 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2014 II. Project Description...

242

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, Rev 1 MSA Annual Categorical Exclusion for Disconnection of Utilities under 10 CFR 1021, Subpart D, Appendix B, B1.27 for Calendar Year 2014 II. Project Description and Location...

243

RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document...  

NLE Websites -- All DOE Office Websites (Extended Search)

2 MSA Annual Categorical Exclusion for Disconnection of Utilities under 10 CFR 1021, Subpart D, Appendix B, B1.27 for Calendar Year 2015. II. Project Description and Location...

244

Project Title: Air Quality Monitoring in the Coastal Environment of Miami Professor's name: Xinrong Ren________________________________________ ______ _  

E-Print Network (OSTI)

on the campus of the Rosenstiel School of Marine and Atmospheric Science. Atmospheric pollutants include ozone in this project will learn basic knowledge of atmospheric science and air pollution, operate some environmental Ren________________________________________ ______ _ Department: Marine and Atmospheric Chemistry

Miami, University of

245

Awards Received in October 2006 Principal Investigator Department Sponsor Project Title Amount GCO OSP Number  

E-Print Network (OSTI)

OSP Number ABRUNA, HECTOR D DISALVO, FRANCIS J CCMR DOE AN ADVANCED MATERIALS APPROACH TO FUEL CELL RESEARCH PROJECT $33,025 THF 52476 BELL, JAMES F CRSR NASA (GODDARD SFC) COMPOSITION AND WEATHERING HISTORY

Danforth, Bryan Nicholas

246

Awards Received in March 2010 Principal Investigator Department Sponsor Project Title Amount GCO OSP Number  

E-Print Network (OSTI)

FOR VISUAL REALISM IN SCALE-COMPLEX SCENES 98,337. MBF 51958 BARBASCH, DAN MATH NSF UNIPOTENT REPRESENTATIONS B SEELEY, ROBIN WEEKS, HAROLD JOHN SHOALS NSF (NSF BIO) UPGRADE OF SANITATION AND COMMUNICATION, JAMES M NAIC NSF A TECHNOLOGY DEVELOPMENT PROJECT FOR THE LARGE-N / SMALL-D SQUARE KILOMETER ARRAY

Danforth, Bryan Nicholas

247

Year Project Title USGS contact(s) Published paper, data source,  

E-Print Network (OSTI)

information Keywords 1 2003-present Delineation of brine contamination in and near the East Poplar oil field_poplar/index.html Project assesses brine contamination to the shallow aquifers and surface water. Energy Development, Williston Basin, Brine contamination, Groundwater, Surface Water, East Poplar oil field, Fort Peck Indian

Torgersen, Christian

248

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 Rev. l 51 Rev. l Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX 81.28, "Placing a Facility in an Environmentally Safe Condition" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will place facilities in a cold, dark, and environmentally safe condition during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & 8 to Subpart D, & CX 81.28. WRPS' facilities include all those identified in

249

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93 Rev 0 93 Rev 0 River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Under CX B5.6, "Oil Spill Cleanup" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to remove and cleanup oil and related contaminated materials recovered during oil spill cleanup operations during Calendar Year 2013. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & ex B5.6. WRPS' facilities include all those identified in the Tank Operations Contract

250

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

38, Rev 1 38, Rev 1 MSA Annual Categorical Exclusion for Electronic Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.7 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform acquisition, installation, operation, modification, and removal of electricity transmission control and monitoring devices, communication systems, data processing equipment, and similar electronic equipment. Activities include, but are not limited to, install fiber optic cable between and within existing buildings; install new conduit and/or replace old conduit; minor

251

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, Rev 0 2, Rev 0 MSA Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform safety and environmental improvements of a facility (including, but not limited to, replacement and upgrade of facility components) that do not result in a significant change in the expected useful life, design capacity, or function of the facility and during which operations may be suspended and then resumed. Improvements include, but are not limited to, replacement/

252

RL-721 REV3 I. Project Title: NEPA REVIEW SCREENING FORM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Number: 10 Number: DOE/CX-00051 Washington River Protection Solutions LLC - Proposed Actions For CY 2012 Scheduled To Take Place Onder CX B1.28, "Placing a Facility in an Environmentally Safe Condition" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, etc.): Washington River Protection Solutions LLC (WRPS) will place facilities in a cold, dark, and environmentally safe condition on & near the Hanford Site during Calendar Year 2012. WRPS will perform all activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX B1.28. WRPS' facilities

253

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

48 Rev. 1 48 Rev. 1 Washington River Protection Solutions LLC -Proposed Actions For CY 2013 Scheduled To Take Place Under CX B1.3, "Routine Maintenance" II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform routine maintenance services on buildings, structures, infrastructure and equipment during Calendar Year 2013. WRPS will perform all routine maintenance activities in accordance with the categorical exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, and CX B1.3. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.13

254

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, Rev 0 3, Rev 0 MSA Annual Categorical Exclusion for Site Characterization and Environmental Monitoring under 10 CFR 1021, Subpart D, Appendix B, B3.1 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform site characterization and environmental monitoring (including siting, construction, modification, operation, dismantlement, and removal of equipment). Activities would be near-surface, shallow, and in previously disturbed or developed areas; designed to conform with applicable requirements and use best management practices to limit the effects of any resultant ground disturbance.

255

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Rev 0 7 Rev 0 Washington River Protection Solutions LLC Place Under CX 86.1, "Cleanup Actions" Proposed Actions For CY 2013 Scheduled To Take 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform small-scale, short-term cleanup actions, costing ten million or less, under the Resource Conservation & Recovery Act (RCRA), Atomic Energy Act, or other authorities as necessary to reduce risk to human health or the environment from a release or threat of release of a hazardous substance of than high-level radioactive waste and spent nuclear fuel during Calendar Year 2013. WRPS

256

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

62 Rev. 1 62 Rev. 1 Washington River Protection Solutions LLC - Proposed Actions For CY 2013 Scheduled To Take Place Onder CX B5.1, "Actions to Conserve Energy or Water" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions ·e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will perform actions to conserve energy or water during Calendar Year 2013. WRPS will perform all activities in accordance with the cal exclusion (CX) limitations set forth in 10 CFR 1021, Appendices A & B to Subpart D, & CX 85.1. WRPS' facilities include all those identified in the Tank Operations Contract Sections J.l3 and J.l4. Activities would include, but are not limited to:

257

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

47, Rev 1 47, Rev 1 MSA Annual Categorical Exclusion for Transfer Actions under 10 CFR 1021, Subpart D, Appendix B, Bl.30 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform transfer actions, where the predominant activity is transportation, and where the receipt and storage capacity and management capability for the amount and type of materials, equipment, or waste to be moved already exists at the receiving site; and all necessary facilities and operations at the receiving site are already permitted, licensed, or approved, as appropriate. Transfers may

258

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

87 87 CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring, December 2012 to December 2013 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions- e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): CH2MHill Plateau Remediation (PRC) will be conducting site characterization and environmental monitoring on the Han Site in accordance with the categorical exclusion (CX) referenced in 10 CFR 102 , Appendix B, CX 83.1, ''Site characterization and environmental monitoring''. PRC ects include all those identified Sections J.l3 and J.l4 of the PRC Contract, DE-AC06-0 RL14788. Site characterization and environmental monitoring (including, but not limited to, siting,

259

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Washington River Protection Solutions LLC - Renovation of 274-AW Under CX B2.l, "Workplace Enhancements" 11. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Washington River Protection Solutions LLC (WRPS) will renovate the 274-AW building. The 274-AW building is a 10-wide modular building located in the 200 East Area near the 241-AW and 241-AP Tank Farms. It was installed in 1993 by Eric R. Brown Construction, Inc. as a support facility for 272-AW. The facility currently serves as an office for WRPS' Base Operations managers and engineers. 274-AW is centrally located and easily accessible,

260

RL-721 REV4 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, Rev 0 11, Rev 0 MSA Annual Categorical Exclusion for Routine Maintenance and Custodial Services under 10 CFR 1021, Subpart D, Appendix B, Bl.3 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform routine maintenance and custodial services on Hanford buildings, structures, infrastructures, and equipment in previously disturbed and developed areas. Routine maintenance and custodial services include those in MSA contract DE-AC06-09RL14728, Attachment J.3. Buildings, structures, infrastructures, and equipment subject to routine maintenance and custodial services

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Pacific Northwest Region MAPS dataset retrospective analysis Project Title: USFS Region Six MAPS Dataset Re-analysis for the Development of Management  

E-Print Network (OSTI)

Pacific Northwest Region MAPS dataset ­ retrospective analysis Project Title: USFS Region Six MAPS Dataset Re-analysis for the Development of Management and Climate Change Support Tools for Landbird) demographic dataset may reveal how predicted patterns of climate-related forest fragmentation, pest outbreak

DeSante, David F.

262

Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests: landscape patterns and the risk of high-severity fire.  

E-Print Network (OSTI)

1 Project Title: Reciprocal interactions between bark beetles and wildfire in subalpine forests of Wisconsin, Madison, WI Dr. William H. Romme, Colorado State University, Fort Collins, CO Dr. Philip A.firescience.gov #12;2 ABSTRACT The interactions of wildfire and bark beetle outbreaks and their reciprocal influences

Turner, Monica G.

263

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Environmental assessment of deep-water sponge fields in relation to oil and gas  

E-Print Network (OSTI)

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Environmental assessment of deep-water sponge fields in relation to oil and gas activity: a west of Shetland case study industry and government identified sponge grounds in areas of interest to the oil and gas sector

Henderson, Gideon

264

UK Oil and Gas Collaborative Doctoral Training Centre (2015 start) Project Title: Exploring the petroleum potential of a frontier province: Cretaceous stratigraphy and  

E-Print Network (OSTI)

UK Oil and Gas Collaborative Doctoral Training Centre (2015 start) Project Title: Exploring Myanmar. It has been shown that gas and oil exists in the basin and that a considerable unconventional biogenic gas system exists in the deep-waters offshore. The sediments of the Rakhine Basin were deposited

Henderson, Gideon

265

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Quantifying the role of groundwater in hydrocarbon systems using noble gas  

E-Print Network (OSTI)

UK Oil and Gas Collaborative Doctoral Training Centre (2014 start) Project Title: Quantifying the role of groundwater in hydrocarbon systems using noble gas isotopes (EARTH-15-CB1) Host institution biodegradation of oil can remove its value ­ but what controls the biodegradation? The deep biosphere plays a key

Henderson, Gideon

266

Program or Field Office: Project Title and I.D. No.:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D. No.: D. No.: u.s. Department of Energy Office of Legacy Management Categorical Exclusion Determination Form Office of Legacy Management Routine Maintenance Activities at th e Grand Junction, Colorado, Calibration Model Facility. LM # 42-11. Location: Grand Junction , Colorado Proposed Action or Project Description: DOE proposes to conduct routine maintenance actions as needed at a facility containing calibration borehole test pits. The facility is located just behind the U.S. Department of Energy Grand Junction Office Site on land leased from the Riverview Technology Corporation . Property adjacent to the east side of the facility is owned by the Union Pacific Railroad; east of that is a City of Grand Junction municipal cemetery. Renewal of the lease generally occurs every 5 years

267

Manhattan Project: A Tentative Decision to Build the Bomb<!--Include title  

Office of Scientific and Technical Information (OSTI)

President Franklin Roosevelt's note to Vannevar Bush giving Bush the tentative go-ahead to build the atomic bomb. A TENTATIVE DECISION TO BUILD THE BOMB President Franklin Roosevelt's note to Vannevar Bush giving Bush the tentative go-ahead to build the atomic bomb. A TENTATIVE DECISION TO BUILD THE BOMB Washington, D.C.(1941-1942) Events > Early Government Support, 1939-1942 Einstein's Letter, 1939 Early Uranium Research, 1939-1941 Piles and Plutonium, 1939-1941 Reorganization and Acceleration, 1940-1941 The MAUD Report, 1941 A Tentative Decision to Build the Bomb, 1941-1942 Vannevar Bush moved swiftly to take advantage of the positive MAUD Report. Without waiting for Arthur Compton's latest committee to finish its work confirming the MAUD Committee's conclusions, Bush on October 9, 1941, met with President Franklin D. Roosevelt and Vice President Henry A. Wallace (who had been briefed on uranium research in July). Bush summarized the British findings, discussed cost and duration of a bomb project, and emphasized the uncertainty of the situation. He also received the President's permission to explore construction needs with the Army. Roosevelt instructed him to move as quickly as possible but not to go beyond research and development. Bush, then, was to find out if a bomb could be built and at what cost but not to proceed to the production stage without further presidential authorization. Roosevelt indicated that he could find a way to finance the project and asked Bush to draft a letter so that the British government could be approached "at the top.

268

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Status Update: EPAct 2005 Title IX, Subtitle J Section 999 - Project NT42677, "Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 UDAC Update Presentation Outline * Consortium Accomplishments * UDW Program RFP Summary - 2007 - 2008 * 2009 Funding Disbursement History * 2009 Program / Process Enhancements - Contractual / GAO - Risk Mitigation / Management 3 Overall: * 3 Annual Plans completed * 15 solicitations released under 2007 R&D funding * 43 projects selected for award under 2007 solicitations - 17 Ultra-Deepwater projects - 19 Unconventional Resources projects - 7 Small Producers projects Program Accomplishments Solicitations & Awards 4 * Current Status:

269

DOE - Office of Legacy Management -- Gardinier Inc - FL 05  

Office of Legacy Management (LM)

Gardinier Inc - FL 05 Gardinier Inc - FL 05 FUSRAP Considered Sites Site: GARDINIER, INC. ( FL.05 ) Eliminated from consideration under FUSRAP - Referred to EPA and State of Florida Designated Name: Not Designated Alternate Name: U. S. Phosphoric Products FL.05-1 Location: Tampa , Florida FL.05-2 Evaluation Year: 1984 FL.05-3 Site Operations: U. S. Phosphoric Products constructed and operated a small scale pilot plant for uranium recovery; and Gardinier investigated a process for the recovery of by-product uranium from wet process phosphoric acid. FL.05-1 FL.05-6 FL.05-7 Site Disposition: Eliminated - No Authority FL.05-3 FL.05-8 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium FL.05-6 FL.05-7 Radiological Survey(s): Yes FL.05-2

270

Project Title:__________________________________________________________________ Proposal #: _____________  

E-Print Network (OSTI)

#: _____________ Company Name: Name on Card: Mailing Address: Email: Telephone: FAX: Credit Card Type: Credit Card #, and the funding expiration date. NanoFab Payment Form Dollar Amount: Exp. Date mm/yy Credit Card Payment Purchase) contact name; 2) email; 3) fax; 4) telephone; 5) company name; 6) company mailing address; 7) Tax

271

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project)  

E-Print Network (OSTI)

Microfabrication Project Proposal Form Principle Investigator: (Person responsible for project: ___________________________________ Department: _____________________ _________________ __ Phone Number: _________________________ Project Information: Project Title: ________________________________________________________________ Funding Agency

272

St. Petersburg, FL: Vehicle Use of Recycled Natural Gas Derived...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

St. Petersburg, FL: Vehicle Use of Recycled Natural Gas Derived from Wastewater Biosolids St. Petersburg, FL: Vehicle Use of Recycled Natural Gas Derived from Wastewater Biosolids...

273

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

274

DOE - Office of Legacy Management -- University of Florida - FL 09  

NLE Websites -- All DOE Office Websites (Extended Search)

Florida - FL 09 Florida - FL 09 FUSRAP Considered Sites Site: UNIVERSITY OF FLORIDA (FL.09) Eliminated from consideration under FUSRAP - Referred to NRC Designated Name: Not Designated Alternate Name: None Location: Gainesville , Florida FL.09-1 Evaluation Year: 1995 FL.09-1 Site Operations: Research and development using test quantities of radioactive metal. FL.09-2 Site Disposition: Eliminated - No Authority - NRC licensed FL.09-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Test Quantities of Uranium and Plutonium FL.09-2 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP - Referred to NRC FL.09-2 Also see Documents Related to UNIVERSITY OF FLORIDA FL.09-1 - DOE Letter; Wagoner to DeLaney; Subject: University of

275

DOE - Office of Legacy Management -- Humphreys Gold Co - FL 08  

Office of Legacy Management (LM)

Humphreys Gold Co - FL 08 Humphreys Gold Co - FL 08 FUSRAP Considered Sites Site: Humphreys Gold Co. (FL.08 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Jacksonville , Florida FL.08-1 Evaluation Year: 1987 FL.08-2 FL.08-3 Site Operations: Processed monazite ore in the 1950s. FL.08-3 Site Disposition: Eliminated - No Authority - No AEC involvement at the site FL.08-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Thorium FL.08-1 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Humphreys Gold Co. FL.08-1 - AEC Memorandum; Edmonds to McCarvill; Subject: Monazite Dredging Operations and Placer Deposits Containing Thorium Minerals; June

276

Syllabus Fall 2014 | APS 1019 Leadership in Project Management | Dr. Haig Baronikian 1 A) Title: APS1019 Leadership in Project Management  

E-Print Network (OSTI)

people and managing resources to achieve the intended project outcomes and benefits. Leadership is often, Strategy and Project Management Vision, Mission and Values! Strategic Planning and the Balanced Scorecard and Project Management 2 Organizational Culture Organizational Culture plays one of the largest roles

Prodiæ, Aleksandar

277

Category Capstone Project Title Student Names Bioengineering & Medical Devices A Point-of-Care Platform for Neonatal Complete Blood Counts  

E-Print Network (OSTI)

Project Peter Florin, Byron Pakter, Eric Scott, Brian Mick Product Design Concussion Terminator : Football Helmet Design, Analysis, Economics Meyssane Alj Hakim, Bruce Lin, Michael Liou Product Design Alo

Sekhon, Jasjeet S.

278

National Ignition Facility Title II Design Plan  

SciTech Connect

This National Ignition Facility (NIF) Title II Design Plan defines the work to be performed by the NIF Project Team between November 1996, when the U.S. Department of Energy (DOE) reviewed Title I design and authorized the initiation of Title H design and specific long-lead procurements, and September 1998, when Title 11 design will be completed.

Kumpan, S

1997-03-01T23:59:59.000Z

279

EERE PROJECT MANAGEMENT CENTER Nl!PA DI!TFIU.nNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PARTh1l1NT OFI!NERGY PARTh1l1NT OFI!NERGY EERE PROJECT MANAGEMENT CENTER Nl!PA DI!TFIU.nNATION Page I of2 RECIPIENT: City of SI. Petersburg STATE: FL PROJECT TITLE: SI. Petersburg Solar Pilol Project (FL) FUnding Opportunity Announcement Number Procunml'nt Instrument Numbu NEPA Control Number CID Number DE-EEOOOO284 GF().OQ()()284-003 G0284 Based on my review ortbe information concerning the proposed action, as NEPA Compliance Officer (authorized UDder DOE Order 451.1A), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.16 Sola r photovoltaic systems The installation, modification, operation, and removal of commercially available solar photovoltaic systems located on a building or other structure (such as rooftop, parking lot or facility, and mounted to Signage,

280

Project Year Project Team  

E-Print Network (OSTI)

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UDAC Recommendations UDAC Recommendations Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 Overview of UDAC 2009 Recommendations Recommendation Areas * R&D Program Focus * Program Scope * Process * Program Progress & Value * Societal Impact 3 R&D Program Focus Area * Safety and environmental projects should be considered as separate topics. * Safety and environmental projects should be identified with specific phases of the exploration and production lifecycle. * The project impact assessment utilized in the project selection process should be made public and available to the UDAC. * Fund projects which address the overall safety impact of UDW activity. * Fund projects which address the overall environmental impact of UDW activity. * The metocean program should be strengthened regarding wind and

282

Fl YO Co -op E athea lectric  

E-Print Network (OSTI)

are based on a false premise that the cost and usage pattern for energy in the Pacific Northwest should and Energy Efficiency The High Level indicator of "Regional Electricity Use per Person vs. US Average" shouldFl YO Co -op E athea lectric Community...Integrity...Reliability 2510 U.S. Highway 2 East

283

J25097-1 Fl_L2 Final Report  

Office of Legacy Management (LM)

5097-1 5097-1 Job Description: Star Center For: S.M. Stoller Corporation 2597 B 3/4 Road Grand Junction, CO 81503 Attention: Mr. Charles Tabor _____________________________________________ Nancy Robertson Project Manager II nancy.robertson@testamericainc.com 09/19/2008 Methods: FDEP, DOH Certification #: E84282, E81005, E81010 These test results meet all the requirements of NELAC unless specified in the case narrative. All questions regarding this test report should be directed to the TestAmerica Project Manager who signed this test report. The estimated uncertainty associated with these reported results is available upon request. The results contained in this test report relate only to these samples included herein. TestAmerica Laboratories, Inc. TestAmerica Tampa 6712 Benjamin Road, Suite 100, Tampa, FL 33634

284

Midwest Renewable Energy Projects LLC | Open Energy Information  

Open Energy Info (EERE)

LLC Jump to: navigation, search Name: Midwest Renewable Energy Projects LLC Place: Florida Zip: FL 33408 Sector: Renewable Energy, Wind energy Product: MRE Projects LLC is a...

285

Grant Reference Grant Holder Research Organisation Project Title NE/I015299/1 Robert Upstill-Goddard Newcastle University Surfactant control of air-sea gas exchange in coastal waters  

E-Print Network (OSTI)

Grant Reference Grant Holder Research Organisation Project Title NE/I015299/1 Robert Upstill of Holocene Monsoon intensity from Central Asia NE/I016414/1 Michael James Lancaster University Quantifying's University of Belfast 14C as a tool to trace terrestrial carbon in a complex lake: implications for food

286

Lead Grant Reference Lead Grant RO Grant Holder Last Name, First Name Project Title NE/K000071/1 Newcastle University Mr R Gaulton Dual-wavelength laser scanning for forest health  

E-Print Network (OSTI)

Newcastle University Mr R Gaulton Dual-wavelength laser scanning for forest health monitoring. NE/K000381/1Lead Grant Reference Lead Grant RO Grant Holder Last Name, First Name Project Title NE/K000071/1 and sensory mechanisms in bat navigation NE/K000403/1 University of Southampton Dr S Watt Emplacement dynamics

287

Grant Reference Principal Investigator Research Organisation Project Title NE/J013544/1 Professor B Hubbard Aberystwyth University Extended-range optical televiewer imaging of the NEEM deep ice borehole, Greenland  

E-Print Network (OSTI)

Grant Reference Principal Investigator Research Organisation Project Title NE/J013544/1 Professor B Hubbard Aberystwyth University Extended-range optical televiewer imaging of the NEEM deep ice borehole/1 Dr A Bedford Edge Hill University Late Holocene temperature reconstruction from Hawes Water northwest

288

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Time: 2014-11-18 08:00:00 6456Proposal: NS-2014-6456-A PI: Paris Wiley Institution: Honeywell Corporation Title: Neutron Single Event Effects T... Start Time: 2014-11-19 08:00:00...

289

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

talks: 18 Presentation number Start time End time Presenter (if not author) First Author Remote Title Primary Task Force Area Alternate Task Force Area 101 9:30 9:37 Irby, Jim...

290

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

ImageRotator.items href: 'javascript:void(0)', alt: 'Mule deer near cocooned reactor', title: 'Mule deer near cocooned reactor', image: src: 'http:www.hanford.govc.cfm...

291

--No Title--  

National Nuclear Security Administration (NNSA)

in Table 2.0. According to Title 40 CFR 61.93.(b)(4), (CFR 2002) no credit was taken for pollution control equipment in determining air emissions. The emissions for NESHAPs...

292

T OF ENERG Y EERE PROJECT MANAGEM EN T CEN T ER NEPA DETERI\lINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IEN IEN T OF ENERG Y EERE PROJECT MANAGEM EN T CEN T ER NEPA DETERI\lINATION RECi PI ENT:Miami-Dade County PROJECT TITLE : County of Miami-Dade, FL Energy Efficiency and Conservation Block Granl STATE: FL Page 1 of2 ~ 0 "· I ~ ' """, .. Funding Opportunity Announcement NUffiMr Procurement Instrument Number NEPA Control Numbu eIn Number DE-EEOOOO790.007.013.014 DE-EEOOOO790(S) EEO Based on my review of the information concrrning the proposed action, as NEPA Compliance Officer (authoril:ed under DOE Order 45I.1A), I have made the followin~ detcnnination: ex, EA, [IS APPENDIX AND NUMBER: IA;scription: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including

293

u.s. DEPARTlIlENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlIIINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

·O'.G: , ·O'.G: , u.s. DEPARTlIlENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlIIINATION RECIPIENT:Polk County PROJECT TITLE: Polk County, FL EECBG - SOW Building Control Systems EE Retrofits (S) Page 1 of2 STATE: FL Funding Opportunity Announcement Number DE-FOAOOOO013 Procurement Instrument Number DE-EE0000796 NEPA Control Number CID Number o Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency thai do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

294

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

295

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

296

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

297

Project Year Project Team  

E-Print Network (OSTI)

; Ian Sims, Student, Electrical and Computer Engineering, Whiting School of Engineering Project Title and Jazz Theory/Keyboard I & II. Technologies Used Digital Audio, Digital Video, Graphic Design, HTML

Gray, Jeffrey J.

298

EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

!, !, u.s. DEPARThIENT OFENI'RGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT :Advanced Magnet Lab, Inc. STATE : FL PROJECf TITLE: A Lightweight, Direct Drive, Fully Superconducting Generator for large Wind Turbines Page 1 of3 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000439 DE-EEOOOS140 GFO-OOOS140-003 G05140 Based on my review of the information concerning tbe proposed action, as NEPA Compliance Officer (authorized under OOE Order 451.1A), I have made the following determination : ex. EA, EIS APPENDIX AND NUMBER: Description: 83.6 Small-scale research and de ve lopment, labo ratory o perations, and pilot projects Siting. construction, modification, operation. and decommiSSioning of facilities for smaliscale research

299

S M Stoller Star Center-WWNA Monthly; Largo, FL  

Office of Legacy Management (LM)

WWNA Monthly; Largo, FL WWNA Monthly; Largo, FL 7031-226 Accutest Job Number: F36361 Sampling Date: 11/03/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

300

S M Stoller Quarterly Sampling, STAR Center, Largo, FL  

Office of Legacy Management (LM)

Quarterly Sampling, STAR Center, Largo, FL Quarterly Sampling, STAR Center, Largo, FL 110406202 Accutest Job Number: F33211 Sampling Dates: 07/13/05 - 07/14/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

S M Stoller Quarterly Sampling, STAR Center, Largo, FL  

Office of Legacy Management (LM)

Quarterly Sampling, STAR Center, Largo, FL Quarterly Sampling, STAR Center, Largo, FL 7030-226 Accutest Job Number: F27229 Sampling Date: 10/07/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

302

S M Stoller Star Center-WWNA Monthly; Largo, FL  

Office of Legacy Management (LM)

WWNA Monthly; Largo, FL WWNA Monthly; Largo, FL 110406202 Accutest Job Number: F25982 Sampling Date: 08/10/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

303

S M Stoller Star Center-WWNA Monthly; Largo, FL  

Office of Legacy Management (LM)

WWNA Monthly; Largo, FL WWNA Monthly; Largo, FL 7030-226 Accutest Job Number: F33038 Sampling Date: 07/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

304

ProjectRanking(Economic) Division Potentially Impacted USACE Navigation Projects  

E-Print Network (OSTI)

94 Galveston SWD FREEPORT HARBOR (0006170) TX X 95 Galveston SWD TEXAS CITY SHIP CHANNEL, TX (0018130 Galveston SWD TEXAS CITY CHANNEL (50-FOOT PROJECT), TX - 010183 (CG) (0010183) TX X 126 New Orleans MVD RIVER, FL (0002480) FL X 338 Galveston SWD CHANNEL TO PORT MANSFIELD, TEXAS (0074847) TX X 350 Mobile

US Army Corps of Engineers

305

EIS-0383: Southern Company's Orlando Gasification Project, Orlando, FL  

Energy.gov (U.S. Department of Energy (DOE))

This EIS analyzes DOE's decision to provide cost-shared funding for construction, design, and operation of a new gasification plant in Orlando, Florida.

306

Project Acronym AMOP Project title (in French)  

E-Print Network (OSTI)

-role on the evolution of climate (greenhouse gases production) and living resources from ecosystems to fisheries Industrial Research International cooperation International cooperation with: United States - MWN United and the worrying problem of the ocean deoxygenation due to global warming and human activities, OMZs have not been

307

TITLE PAGE  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: Seismic and Rockphysics Diagnostics of Title: Seismic and Rockphysics Diagnostics of Multiscale Reservoir Textures Type of Report: Final Technical Reporting Start Date: April 1, 2005 Reporting End Date: June 30, 2005 Principal Investigator: Prof. Gary Mavko Date of Report: July 2005 DOE Award Number: DE-FC26-01BC15354 Submitting Organization: Stanford University, 651 Serra Street, Suite 260, Stanford, CA 94305-4125 1 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warrantee, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not

308

DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

s, s, DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERM INATION RECIPIENT:University of Central Florida PROJECf TITLE : Florida Hydrogen Initiative· 3 letter of Interest (LOI) Projects Page I of2 STATE: Fl Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number COP Renewal DE·FC36-04G014225 GF0-04-221e G014225 Based on my review orlbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.IA), I have made the (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: B 3.6 Siting. construction (or modification). operation, and decommissioning of facilities for indoor bench-scale research projects and conventional laboratory operations (for example, preparation of chemical standards and sample analysis):

309

S M Stoller Quarterly Sampling, STAR Center, Largo, FL  

Office of Legacy Management (LM)

2/04 2/04 Technical Report for S M Stoller Quarterly Sampling, STAR Center, Largo, FL 110406202 Accutest Job Number: F25409 Sampling Dates: 07/13/04 - 07/14/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

310

S M Stoller Quarterly Sampling, STAR Center, Largo, FL  

Office of Legacy Management (LM)

0/06 0/06 Technical Report for S M Stoller Quarterly Sampling, STAR Center, Largo, FL 110406202 Accutest Job Number: F39137 Sampling Dates: 03/08/06 - 03/09/06 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

311

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRU Pad 1 Inventory. This project will provide personnel weather shelters (shelters, Mobile Mini) for personnel supporting the ARRA in E-Area while new facilities are being...

312

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The goal of the project is to reduce the City's energy intensity and costs, and lower GHG emissions. The Technical Energy Audit (TEA) will evaluate systems, equipment and...

313

Presentation title  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy initiated effort to develop renewable energy resources and reduce GHG emissions * Develop a high level "screening tool" to identify potential projects that...

314

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and control rights usually and customarily provided to lenders in similar project finance transactions" allows DOE, within its sole discretion and in appropriate circumstances as...

315

Recent Titles  

E-Print Network (OSTI)

Kings River Project, CA-Fre- 1441, CA-Fre-1442, CA-Fre-1443 and CA- Fre-1444, Fresno County, California.

Moratto, Michael J

1984-01-01T23:59:59.000Z

316

--No Title--  

Energy Savers (EERE)

56 DATE: June 4, 2013, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

317

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

an energy efficiency strategy, retaining technical services, and upgrading the HVAC system for the County of Twin Falls. OCRWM Twin Fall County Energy Efficiency Projects...

318

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Developing an energy efficiency strategy and upgrades for multiple HVAC systems for the city of Hobbs. OCRWM Hobbs Energy Efficiency Project New Mexico Apr 9, 2010 Kathryn Knapp...

319

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

retaining technical services, conducting audits, lighting retrofits, and potential HVAC upgrades for Miles City. OCRWM Miles City Energy Efficiency Projects Montana Apr 3,...

320

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The tribe proposes to hire an individual and provide energy audit training to create an Energy Auditor position. The project will perform energy audits for local commercial and...

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

--No Title--  

Office of Legacy Management (LM)

March 21, 2014 Re: Instrumentation and Monitoring, Rocky Flats OLF Tt Project : 114-181750 Introduction This technical memorandum provides a summary and evaluation of data...

322

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

& Controls Simulation Engineering High Performance Materials Innovative Energy Concepts Water Management R&D University Research CCSI NRAP Program Plan Project Information...

323

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

a project led by Joseph Oefelein of Sandia National Laboratories will study the combustion processes of internal combustion engines, helping to make vehicles more efficient, thus...

324

--No Title--  

Energy Savers (EERE)

52 DATE: May 6, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management...

325

--No Title--  

National Nuclear Security Administration (NNSA)

NUCLEAR ENERGY UNIVERSITY PROGRAMS Improved Fission Neutron Data Base for Active Interrogation of Actinides PI: Pozzi, Sara - University of Michigan Project Number: 09-414...

326

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

joined Martin Marietta Energy Systems as project coordinator for the International Thermonuclear Experimental Reactor (ITER) engineering design activities. He became the U.S. ITER...

327

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

376-1297, DeeMillikin@rl.gov Three Fuel Storage Facilities Removed from Hanford's Landscape Completion of Recovery Act Project Reduces Cleanup Footprint RICHLAND, WASH. - Gone...

328

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and pilot projects The proposed action would involve the purchase and installation of a solar panel system on the community washeteria, a public facility with rest rooms, showers...

329

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Develop energy efficiency and conservation strategy, 2) technical consultant, 3) revolving loan program, 4) sub grants for commercial projects, 5) energy upgrades of city...

330

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategy (EECS) focuses upon the following EECBG project activities: "Technical Consultant Services" and "Energy Efficiency Retrofits" as described by the EECBG Program....

331

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical consultant, 2) revolving loan program, 3) sub grants for commercial projects, 4) energy upgrades of city facilities Energy Efficiency and Conservation Block Program Hire...

332

GEOL 5303 Project Presentations Presenter name: ______________________________________________  

E-Print Network (OSTI)

GEOL 5303 Project Presentations Presenter name: ______________________________________________ Project title: ___________________________________________________________ Project content Superb Effective Weak Absent Introduction: What is your project topic? Presenter provides a clear introduction

Smith-Konter, Bridget

333

Presentation Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hawaii Sustainable Energy Project - Hawaii Sustainable Energy Project - NREL Support DOE OE Smart Grid Peer Review Ben Kroposki, PhD, PE November 2-4, 2010 Innovation for Our Energy Future Innovation for Our Energy Future Hawaii Sustainable Energy Project- NREL Objective Funding Summary ($K) FY09 FY10 FY11 300K 300K 300K Technical Scope Provide technical support to Hawaii to reach goal of 70% renewable and energy efficiency Provide technical support to Lanai (MECO and C&C) to help reach goal of 100% renewable energy. Provide Kauai and KIUC with technical support regarding integration of renewable energy. Provide technical support for Hawaii in the areas of grid integration of distributed and renewable energy and smart grid applications Innovation for Our Energy Future Needs and Challenges This project addresses the Smart

334

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

BioCee's thin-film coating technology. Bio- hydrocarbons will be converted into fuels by chemical catalytic processes. Advanced Research Projects Agency - Energy (ARPA-E) 25A4083...

335

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

materials, 3) bike path extension (.5 miles), 4) expand recycling program, 5) install,o solar panels on city building-panels are to be used as a demonstration project to collect...

336

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

between supercomputers and the huge data available in molecular databases like the Human Genome Project," Baudry said. "We have an avalanche of data available to us, and now we...

337

--No Title--  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Replacing an HVAC system for the city of West New York OCRWM West New York Energy Efficiency Projects New Jersey Apr 9, 2010 Kathryn Knapp Digitally signed by Kathryn Knapp DN:...

338

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

engineering that evolved from their work on a DOE project that focused on developing mobile robots to work in hazardous environments. The invention won an R&D 100 Award in...

339

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

Math, Science and Technology Nov. 5 at Georgia Tech in Atlanta. Under the guidance of Boyd Evans and John Mueller, ORNL biomedical engineers, Cain and Liu developed a project...

340

--No Title--  

NLE Websites -- All DOE Office Websites (Extended Search)

New conductor could provide answers for energy demand OAK RIDGE, Tenn., Nov. 7, 2002 - Oak Ridge National Laboratory and 3M Company are hoping for powerful results from a project...

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Track 1A: Oil & Gas Production Track 1A: Oil & Gas Production and Utilization-Overview George Guthrie Office of Research and Development National Energy Technology Laboratory Title, Date ‹#› The Need: Energy portfolio is projected to remain anchored by fossil. Sources: U.S. data from EIA, Annual Energy Outlook 2011; World data from IEA, World Energy Outlook 2010, Current Policies Scenario 79% Fossil Energy 78% Fossil Energy 84% Fossil Energy 81% Fossil Energy * Primarily traditional biomass, wood, and waste. Gas 24% Coal 21% Oil 33% Nuclear 8% Renewables 14% Gas 24% Coal 22% Oil 37% Nuclear 8% Renewables 8% Gas 21% Coal 27% Oil 33% Nuclear 6% Renewables* 13% Gas 22% Coal 29% Oil 28% Nuclear 8% Renewables* 15% + 14% + 47% Energy Demand 2008 Energy Demand 2035 World

342

Presentation Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mexico (PNM) - PV Plus Storage for Simultaneous Voltage Smoothing and Peak Shifting Steve Willard PE Principal Investigator November 3, 2010 Funded in part by the Energy Storage Systems Program of the U.S. Department Of Energy through National Energy Technology Laboratory PNM/DOE SGDP Battery + PV Objectives * Project will co-locate a 2 - 4 MWh Advanced Lead Acid battery with a separately installed 500kW solar PV plant at a utility-owned site to create a firm, dispatchable distributed generation resource. * The project will develop broadly applicable modeling tools. These tools are being developed and used during the project to optimize the battery-system control algorithms, and ultimately will help characterize and further the understanding of feeders with storage and distributed

343

FUPWG Meeting Agenda - Cape Canaveral, FL | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cape Canaveral, FL Cape Canaveral, FL FUPWG Meeting Agenda - Cape Canaveral, FL October 7, 2013 - 3:00pm Addthis FUPWG Spring 2007 - Cocoa Beach, FL: Launching a New Era of Energy Efficiency" Hosted by: Florida Power and Light Company logo FEMP logo May 1-2, 2007 Hosted by Florida Power and Light Company Monday, April 30, 2007 5:00 - 6:30 Steering Committee meeting at Skylab/Atlas Conference Room, Doubletree Hotel 6:30 until... Networking dinner at 3 Wishes Restaurant, Doubletree Hotel Tuesday, May 1, 2007 7:45 - 8:30 Registration/Continental Breakfast 8:30 - 8:45 Florida Power & Light Welcome Marlene Santos, FPL Vice President of Customer Service 8:45 - 9:00 FEMP Welcome David McAndrew, FEMP 9:00 - 9:30 Washington Update David McAndrew, FEMP National Defense 2007 Authorization

344

S M Stoller Star Center-WWNA Monthly; Largo, FL  

Office of Legacy Management (LM)

7170 7170 Sampling Date: 10/05/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D. Laboratory Director e-Hardcopy 2.0 Automated Report 12 1 of 12

345

S M Stoller Quarterly Sampling, STAR Center, Largo, FL  

Office of Legacy Management (LM)

227 227 Sampling Dates: 03/31/04 - 04/01/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D. Laboratory Director e-Hardcopy 2.0 Automated Report

346

S M Stoller Star Center-WWNA Monthly; Largo, FL  

Office of Legacy Management (LM)

124 124 Sampling Date: 01/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D. Laboratory Director e-Hardcopy 2.0 Automated Report 18 1 of 18

347

S M Stoller Quarterly Sampling, STAR Center, Largo, FL  

Office of Legacy Management (LM)

531 531 Sampling Date: 04/16/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D. Laboratory Director e-Hardcopy 2.0 Automated Report 21 1 of 21

348

S M Stoller Star Center-WWNA Monthly; Largo, FL  

Office of Legacy Management (LM)

8014 8014 Sampling Date: 11/09/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D. Laboratory Director e-Hardcopy 2.0 Automated Report 12 1 of 12

349

S M Stoller Star Center-WWNA Monthly; Largo, FL  

Office of Legacy Management (LM)

623 Sampling Date: 020205 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ...

350

PRESENTATION TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects Impacting Federal Projects Impacting Federal Power Tulsa District Dan Brueggenjohann 12 June 2013 BUILDING STRONG ®  Interpretation/Application of CERM-F-2013-18  303(d) Listing of Broken Bow Tailwaters  Interior Least Tern Operations and Habitat Creation  Tulsa Vision 2025  Dam Safety Issues ► Keystone, Pine Creek, Robert S. Kerr, Denison  Lake Eufaula Advisory Committee  Tenkiller Downstream Fishery Issues  Broken Bow Seasonal Pool Update - Cultural Resources Impacts  Arkansas River Navigation Improvement  Oklahoma Comprehensive Water Plan Update BUILDING STRONG ® Interpretation/Application of CERM-F-2013-18  Situation - New Resource Management regulation to increase the capitalization threshold for power marketing agency assets.

351

PRESENTATION TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

Southwestern Regional Southwestern Regional Hydropower Conference Michael Biggs, PE Chief, Reservoir Control Section Hydraulics & Technical Services Branch Little Rock District 16 June 2011 BUILDING STRONG ® White River Operations BUILDING STRONG ® Typical River Basin BUILDING STRONG ® Typical Multi Purpose Project BUILDING STRONG ® Typical River Section BUILDING STRONG ® Typical Regulating Station BUILDING STRONG ® White River Basin and Projects BUILDING STRONG ® White River System  Operated as a SYSTEM of reservoirs ► Beaver, Table Rock, Bull Shoals, Norfork are a 4-lake subsystem ► Greers Ferry ► Clearwater  "Comprehensive" system of water control regulation ► encompasses the entire White River basin ► 1 water control plan  Operation of the system is VERY COMPLEX

352

unknown title  

E-Print Network (OSTI)

AbstractThe problem of wastewater treatment in Egypt is a two-fold problem; the first part concerning the existing rural areas, the second one dealing with new industrial/domestic areas. In Egypt several agricultural projects have been initiated by the government and the private sector as well, in order to change its infrastructure. As a reliable energy source, photovoltaic pumping systems have contributed to supply water for local rural communities worldwide; they can also be implemented to solve the problem wastewater environment pollution. The solution of this problem can be categorised as recycle process. In addition, because of regional conditions past technologies are being reexamined to select a smallscale treatment system requiring low construction and maintenance costs. This paper gives the design guidelines of a Photovoltaic Small-Scale Wastewater Treatment Plant (PVSSWTP) based on technologies that can be transferred. KeywordsRenewable energy sources, Photovoltaic, small-scale projects, wastewater treatment. I I.

Photovoltaic Small-scale; Wastewater Treatment; Fadia M. A. Ghali

353

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network (OSTI)

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

354

Presentation title  

NLE Websites -- All DOE Office Websites (Extended Search)

Meeting Transmission Meeting Transmission Challenges in the Rocky Mountain Region Jeff Hein June 21, 2011 Western Renewable Energy Zones Composite photo created by NREL Presentation Outline * WREZ Vision * Chronology * WREZ Initiative Overview * Generation and Transmission Model * Lessons Learned * Future Activities National Renewable Energy Laboratory WREZ Vision * Western Governor's Association and U.S. Department of Energy initiated effort to develop renewable energy resources and reduce GHG emissions * Develop a high level "screening tool" to identify potential projects that allows industry stakeholders to analyze and compare economics of

355

PRESENTATION TITLE  

NLE Websites -- All DOE Office Websites (Extended Search)

STRONG STRONG ® Projects Impacting Federal Power Tulsa District Dan Brueggenjohann 9 June 2010 BUILDING STRONG ® 303(d) Listing of Broken Bow Tailwaters Impairment Impaired Use Cadmium Fish and Wildlife Propagation - Trout Fishery Lead Fish and Wildlife Propagation - Trout Fishery Water Temperature* Fish and Wildlife Propagation - Trout Fishery The 303(d) List reports on waters identified as impaired. These waters: Have elevated portions of one or more pollutants. Do not meet one or more water quality standards. Portions of the Mountain Fork River below Broken Bow Dam are on the 2010 draft Oklahoma 303(d) list. * ODWC is currently working to implement a selective withdrawal

356

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project  

E-Print Network (OSTI)

SENIOR PROJECT APPROVAL FORM Submit this completed form with your Honors Senior Project I. PERSONAL: _______________________________________ Classification: Junior Senior II. PROJECT INFORMATION Type of Project: Thesis Group Project Internship Creative Project Study Abroad Service Learning Project Title

Huang, Haiying

357

unknown title  

E-Print Network (OSTI)

THE GOAL OF PROJECT APOLLO, to place a man on the surfaceof the Moon and return him safely to Earth, was a task for engineering and technology. The resultant transportation system was so robust in its capability that a rich scientific harvest also was gathered in the process. The visibility and magnitude of the Apollo program left the impression, even within the scientific community,that the major lunar scientific questions had been answered. Since the Surveyor project, NASA's unmanned planetary program has ignored the Moon, preferring to concentrate its admittedly limited resources on other bodies in the solar system. In 1972,lunar scientists proposed launching a remote-sensing satellite into lunar polar orbit. Carrying a small number of geochemical and geophysical sensors,the Lunar Polar Orbiter (LBO)was designed to expand to global coverage the limited Apollo orbital science data set. Remote-sensing information from the orbiting Service Modules of Apollos 15, 16,and 17 had been invaluable in revealing the scale and extent of the planetary processes whose nature and timing were decoded in analyses of the returned samples. Low orbital inclination and limited time at the Moon resulted in tantalizingly

unknown authors

358

DEPART.MENT OF ENERGY EE RE PROJECT MANAG EMENT C ENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tamarac Tamarac u.s. DEPART.MENT OF ENERGY EE RE PROJECT MANAG EMENT C ENTER NEPA DETERMINATION PROJECT TITLE: Solar Panel and Induction lighting Project Page 1 of2 STATE:FL Funding Opportuoity Announcement Number Procurement Instrument Number NEPA Control Number CID Number FY 2010 COP GFO-OOO3187-OO1 0 Based on my review ofthe information concerning the proposed adion, as NEPA Compliance Offi<:er (authorized under DOE Ordu451.1A),1 have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conselVe energy, demonstrate potential energy conselVation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

359

RECIPIENT:Broward County u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Broward County Broward County u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION PROJECT TITLE : Sroward County SOLAR Project Page 1 of2 STATE: FL Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number elD Number DE-FOA-OOOO549 DE-EEOOO5701 GFO-OOO5701-OO1 0 Based on my review oftbe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S 1.1 A), I bave made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A 11 Technical adv ice and assistance to organizations Technical advice and planning assistance to international, national , slale, and local organizations. A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and audits), data analysis

360

Title page  

Office of Legacy Management (LM)

Institutional Controls Evaluation (ICE) Report: Institutional Controls Evaluation (ICE) Report: Summary of Supporting Information for the Identification and Evaluation of Institutional Controls for the Weldon Spring Site September 2004 prepared by Environmental Assessment Division, Argonne National Laboratory prepared for U.S. Department of Energy, Office of Legacy Management, Weldon Spring Site Remedial Action Project, Weldon Spring, Missouri, under Contract W-31-109-Eng-38 iii September 2004 CHECKLIST FOR INSTITUTIONAL CONTROL (IC) PACKAGE FOR THE WELDON SPRING SITE For identifying, evaluating, selecting the IC mechanisms for the Weldon Spring Site, the items in the checklist below are included in this report. ¥ 1. Provide maps and figures showing boundaries of the land use controls (Section 4 and

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Main Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50 State Street, Suite 3 50 State Street, Suite 3 Montpelier, VT 05602 Phone: 802-223-8199 web: www.raponline.org Roadmap 2050: A practical guide to a prosperous, low-carbon Europe A project of the European Climate Foundation Presentation to the U.S. Department of Energy Electricity Advisory Committee Michael Hogan, Senior Advisor, RAP 12 July 2011 Month dd, yyyy The objective was to develop a fact based report - supported by key stakeholders and feeding directly into EU decision making 2 Key deliverables ▪ A set of plausible and visionary emissions pathways with an 80% reduction across the EU-27 below 1990 levels by 2050 ▪ Deep dive on the decarbonization of the power sector ▪ Implications on strategic options for the EU ▪ A related set of policy options highlighting poten-

362

J14252-1 FL Level 2 Rpt PQL Final Report.pdf  

Office of Legacy Management (LM)

660-14252-1 660-14252-1 Job Description: Pinellas Annual Sampling For: S.M. Stoller Corporation 2597 B 3/4 Road Grand Junction, CO 81503 Attention: Mr. Charles Tabor Nancy Robertson Project Manager II nrobertson@stl-inc.com 03/29/2007 Methods: FDEP, DOH Certification #: E84282 These test results meet all the requirements of NELAC unless specified in the case narrative. All questions regarding this test report should be directed to the STL Project Manager who signed this test report. The estimated uncertainty associated with these reported results is available upon request. Project Manager: Nancy Robertson STL Tampa 6712 Benjamin Road Suite 100, Tampa, FL 33634 Tel (813) 885-7427 Fax (813) 885-7049 www.stl-inc.com Severn Trent Laboratories, Inc. Page 1 of 37 Page 2 of 37

363

Project Year Project Team  

E-Print Network (OSTI)

information systems (GIS) tools to design maps that integrate data for visualizing geographic concepts School of Engineering Project Title GIS & Introductory Geography Audience Undergraduate students on how to use the Internet for geographic research, and an interactive introduction to GIS through online

Gray, Jeffrey J.

364

DOE - Office of Legacy Management -- Virginia-Carolina Chemical Corp - FL  

Office of Legacy Management (LM)

Virginia-Carolina Chemical Corp - Virginia-Carolina Chemical Corp - FL 06 FUSRAP Considered Sites Site: Virginia-Carolina Chemical Corp. (FL.06 ) Eliminated from consideration under FUSRAP - Referred to US EPA and State of Florida Designated Name: Not Designated Alternate Name: Conserv Corporation FL.06-1 Location: Nichols , Florida FL.06-2 Evaluation Year: 1985 FL.06-1 Site Operations: Process development studies and pilot plant testing of uranium recovery from phosphoric acid during the mid-1950s. Site Disposition: Eliminated - No Authority FL.06-1 FL.06-4 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium Radiological Survey(s): Yes FL.06-2 Site Status: Eliminated from consideration under FUSRAP - Referred to US EPA and State of Florida FL.06-1

365

DOE - Office of Legacy Management -- University of Miami - FL 0-01  

Office of Legacy Management (LM)

Miami - FL 0-01 Miami - FL 0-01 FUSRAP Considered Sites Site: UNIVERSITY OF MIAMI (FL.0-01 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Miami , Florida FL.0-01-1 Evaluation Year: 1987 FL.0-01-1 Site Operations: Research. FL.0-01-1 Site Disposition: Eliminated - Potential for contamination considered remote based on nature of the operations FL.0-01-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated FL.0-01-1 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to UNIVERSITY OF MIAMI FL.0-01-1 - Aerospace Letter; Young to Wallo; Subject: Elimination Recommendation -- Colleges and Universities; September 23, 1987

366

Title Standards 2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards 2001 Standards 2001 A guide for the preparation of title evidence in land acquisitions by the United States of America. Quick links to Contents: Table of Contents / Why Title Standards 2001, and who uses it? / Evidence of title / Abstract of Title Supplemental and Supporting Title Evidence / Title Insurance Policies and Certificates of Title / Final Title Evidence Title Evidence for Condemnations / The Deed to the United States / Special Standards for Texas / Sample Forms U.S. Department of Justice Environment and Natural Resources Division Land Acquisition Section Washington, D.C. 20530 December 29, 2000 (reprint March 23, 2001) [Editor's Note: The reprint of March 23, 2001, added page numbers to the table of contents; added a new item "3" to part B of Form # 1 of the Certificate of Inspection and Possession,

367

York Externally Funded Research Grants and Contracts -July 1, 2009 to December 31, 2009 Rersearcher Project Title Funder Total Funding Start Date End Date  

E-Print Network (OSTI)

of Spatial Framework to Enhance Chronic Disease Surveillance Public Health Agency of Canada $102,936 10 for an Energy Efficient Ontario SeeLine Group LTD. $10,000 11/1/2009 4/30/2010 Bebko, James Mentoring Project Conservation Authority $5,000 12/22/2009 12/31/2010 Bohr, Yvonne Parent-Infant Separation in Trans- national

368

York Externally Funded Research Grants and Contracts -January 1, 2010 to June 30, 2010 Rersearcher Project Title Funder Total Funding Start Date End Date  

E-Print Network (OSTI)

to Low Income Households and an Assessment of Their Debt Relief Options SSHRC $67,029 4/1/2010 3, Uzoamaka N Black Creek Community Capacity Building Project Delta Family Resource Centre $25,284 1 Playing Field Understanding Relative Age Effects in Sport SSHRC $100,563 4/1/2010 3/31/2013 Page 1 of 20

369

FUPWG Meeting Agenda - Destin, FL | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Destin, FL Destin, FL FUPWG Meeting Agenda - Destin, FL October 7, 2013 - 2:56pm Addthis Going coastal for energy efficiency. FUPWG. April 15-16, 2008, Destin, Florida Gulf Power: A Southern Company FEMP logo April 15-16, 2008 Hosted by Gulf Power Monday, April 14, 2008 6:30 pm Steering Committee Meeting & Networking Dinner Ocean Club 8955 US Highway 98 W Miramar Beach, FL 32550 Tuesday, April 15, 2008 7:45 - 8:30 am Registration and Continental Breakfast 8:30 - 8:45 am Gulf Power Welcome P. Bernard Jacob, Customer Operations Vice President 8:45 - 9:15 am FEMP Welcome David McAndrew, FEMP 9:15 - 10:00 am Washington Update David McAndrew, FEMP 10:00 - 10:30 am Technology Update Paul Kistler 10:30 - 11:00 am Networking Break & New Member Mentor Introductions 11:00 - 11:30 am Gulf Power Success Story - NAS Chiller Replacement

370

The Florida State University Panama City, FL 32405-1099  

E-Print Network (OSTI)

The Florida State University Panama City, FL 32405-1099 Office of Student Affairs · 4750 Collegiate their October 3, 2005 MEMORANDUM TO: Faculty and Students, Panama City FROM: Melissa A. Jones, Director, Office of Student Affairs, Panama City RE: Special Instructions for Panama City Campus pertaining to the FSU

371

U.S. DEPARTlVIENT OF ENERGY p.GI.G!) EERE PROJECT MAN AG EMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

p.GI.G!) EERE PROJECT MAN AG p.GI.G!) EERE PROJECT MAN AG EMENT CENTER NEPA DETERMINATION RECIPIENT:Palm Beach County STATE: FL PROJECT TITLE: EECBG Activity 1: Digester Biogas Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-EE00013 DE-EE0000793 GFO-0000793-001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45 1.1A), 1 have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 65.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders, owners, consultants, designers), organizations (such as utilities), and state

372

U.S. DEPARTIl1ENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETEJU,fiNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

All.t! , All.t! , U.S. DEPARTIl1ENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETEJU,fiNATION RECIPIENT:Miami Dade County PROJECT TITLE: Energy Efficient Lighting on Green Roadway Demonstration Project Page 1 of2 STATE: FL Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE·FOA..ooooo13 EE-OOOO790 0 Ba~d on my uview oflhe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 45I.lA), I bave made the (ollowing detuminalion: ex, EA, [IS APPENDIX AND NUMBER: Description: 85.1 ActJons to oonserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not Increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

373

u.s. DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERl\UNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTlVIENT OF ENERGY DEPARTlVIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERl\UNATION RECIPIENT: City of Saint Petersburg STATE: FL PROJECT Sustainable Biosolids/Renewable Energy Plant TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number FY10 COP DE-EE0003145 gfo-0003145-001 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1 A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Descri ption: A11 Technical advice and planning assistance to international, national, state, and local organizations. A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including

374

EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION RECIPIENT:Advanced Magnet Lab  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OFENFRGY OFENFRGY EERE PROJECT MANAGEMENT CENTER NFPA DETERMINATION RECIPIENT:Advanced Magnet Lab Page 1 of2 STATE: FL PROJECT TITLE: A Lightweight. Direct Drive, Fully Superconducting Generator for Large Wind Turbines Funding Opportunity Announcement Number Pnx:uumeDtlnstrument Number NEPA Control Number CIO Number DE-FOA-0000439 DE-EEOOO5140 GF()"()()()5140-001 EE5140 Based on my review of.he information concerning tbe proposed action, as NEPA Compliance Officer (authorized under- DOE Order 4SI.IA), I have made tbe following determination: ex, EA, [IS APPENDIX AND NUMBER: Description: A9 Information gathering (including , but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and

375

NEPA DETERM1.I"{ REClPIENT:Abengoa Solar Inc STATE: CO PROJECT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OF::ENEROY OF::ENEROY 6flR:EPROJECT MANAGEMBNTCENTER NEPA DETERM1.I"{ REClPIENT:Abengoa Solar Inc STATE: CO PROJECT Development of Molten-Salt Heat Transfer Fluid Technology for Parabolic Trough Solar Power Plants TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FC36-08G018038 FC36-08G018038 GFO-G018038-001 G018038 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: 63.6 Siting. construction (or modification). operation, and decommissioning of facilities for indoor bench-scale research projects and conventional laboratory operations (for example. preparation of chemical standards and sample analysis);

376

P,OU)JI U.S. DEPARTIIIEN T OF ENER GY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OU)JI OU)JI U.S. DEPARTIIIEN T OF ENER GY EERE PROJECT MANAGEMENT CENTER NEPA DE TERlVlINATION RECIPIENT:City of St Petersburg PROJECT TITLE: EECBG Gir( of St. Petersburg· Commercial Energy Efficiency Audit Program Page 1 0[2 STATE: FL Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CID Number DE-FOA-0000013 DE-EE00007BO 0 Based on my review or the infonnation concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 45t.IA), I have made th l~ (ollowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited 10, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

377

U.S. DFPARThiENT OF ENERGY EERE PROJECT MANAG E MENTCE~TER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DFPARThiENT OF ENERGY DFPARThiENT OF ENERGY EERE PROJECT MANAG E MENTCE~TER NEPA DETER}.flNATION Page 1 of3 RECIPIENT:Ohio Department of Development's Office of Energy STATE: OH PROJECT TITLE: RECOVERY ACT STATE ENERGY PROGRAM AWARD FOR THE STATE OF OHIO- REVOLVING LOAN FUND Funding Opportunity Announcement Number DE-FOA-000052 Procurement Instrument Number DE-EE0000165 NEPA Control Number CID Number GFQ-0000165-040 GO Based on my review oftbe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I bave made tbe following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A91nformation gathering, analysis, and d issemination A11 Technical adv ice and assistance to organizations 81 .31 Installation

378

u.s. DEPARTIvIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERl\IINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

u.s. DEPARTIvIENT OF ENERGY u.s. DEPARTIvIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERl\IINATION RECIPIENT:Miami-Dade Water & Sewer Department STATE:FL PROJECT TITLE: SDWNTP-lnstaUSron of Co-Gen Units 4 & 5 and Landfill Gas Pipeline Construction Page 1 of3 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number em Number DE-FOA-OOOOO13 EEOOOO790.001 0 Based on my review ortbe information concnning the proposed action, as NEPA Complianu Offiur (authorized under- DOE Order 451.IA), I have made the fnDowing determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy~fficiency that do not increase the indoor concentrations of potentially hannful substances. These actions may involve financial and technical

379

U.S. DEP_·UUMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

·UUMENT OF ENERGY ·UUMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERMINATION RECIPIENT:University of Central Florida PROJECf TITLE: PV Manufacturing Consortium Page 1 of2 STATE: Fl Funding Opportunity Announcement Number Pn)(urement Instrument Number NEPA Control Number CIO Number DE·FOA-OOOOO259 DE-EEOOO4947 GFO-OOO4947'()()2 0 Based on my review of the info rmation concerning the proposed sction, as NEPA Compliance Officer (authorb:ed under DOE Order4S1 .1A),1 have made the following determination: ex, EA, EI S APPENDIX AND NOMBER: Description: 8 3.6 Siting , oonstruction (or modification), operation, and decommissioning of facilities for indoor bench-scale research projects and oonventionallaboratory operations (for example, preparation of chemical standards and sample analysIs):

380

U.S. DEPARTl.VIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTl.VIENT OF ENERGY DEPARTl.VIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERJ.V.IINATION RECIPIENT: Florida Department of Agriculture and Consumer Services PROJECT TITLE: State Energy Program STATE: Fl Page 1 of2 ~ ~ Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE-FOA-0000643 DE-EE0004575 GF0-0004575-001 Based on my review of the information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 45l.IA), I bave made the following determination: C X, EA, EIS APPENDIX AND NUMBER: Description: AS Information gathering, analysis, and dissemination A11 Technical advice and assistance to organizations Rational for determination: Information gathering (including, but not limited to, literature surveys 1nventones, site visits. and

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Final Environmental Assessment of Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Impact Ground Water Compliance at the Slick Rock, Colorado, UMTRA Project Sites AGENCY: U.S. DEP.4RTMENT OF ENERGY ACTIOK: FL&-DING OF NO SIGNIFICANT IMP-ACT (FONSI) SU$IM$RY: The U.S. Department of Energy (DOE) plans to implement ground lvater compliance strategies for two Uranium Mill Tailings Remedial Action (UMTR.4) Project sites near Slick Rock. Colorado. The purpose of the strategies is to comply with U.S. En\.ironmental Protection .Qency (EP.Aj ground n'ater standards defined in Title 40 Codr ~fF~d~w/ iieplutio?r.s (CFR) Part 192. and in so doing. protect human health and the en\.ironment. Ground water at the Slick Rock sites is contaminated with residual radioactive materials from hisTorica acti\,ities, associated with the processin of uranium ore, The planned action (~formeri>,.

382

u.s. DEPARTIlIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlllINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTIlIENT OF ENERGY DEPARTIlIENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlllINATION RECIPI[NT:City of Jacksonville PROJECT TITLE: EECBG - Jacksonville Activity #9 Clean Energy Distribution Page 1 of2 STATE: FL FUnding Opportunity Announcement Number Pn>Cu~mtnt Instromeot Number NEPA Control Number em Number DE-FOA-OOOOO13 DE-EEOOOO777.003 0 Based on my review oftbe information concerning the proposed action, liS NEPA Compliance Officer (authorized under DOE Ordu4St.lA). I bave made the following determination: ex, EA, [IS A.PPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

383

ProjectRanking(Economic) Division Potentially Impacted USACE Navigation Projects  

E-Print Network (OSTI)

X 94 Galveston SWD FREEPORT HARBOR (0006170) TX X 95 Galveston SWD TEXAS CITY SHIP CHANNEL, TX (0017960) FL X 110 New Orleans MVD FRESHWATER BAYOU, LA (0006200) LA X 115 Galveston SWD TEXAS CITY CHANNEL Projects Project State(s) Opossumpipefish 2 Galveston SWD HOUSTON SHIP CHANNEL (0007780) TX X 8 Galveston

US Army Corps of Engineers

384

ProjectRanking(Economic) Division Potentially Impacted USACE Navigation Projects  

E-Print Network (OSTI)

) MS X 94 Galveston SWD FREEPORT HARBOR (0006170) TX X 95 Galveston SWD TEXAS CITY SHIP CHANNEL, TX (0017960) FL X 110 New Orleans MVD FRESHWATER BAYOU, LA (0006200) LA X 115 Galveston SWD TEXAS CITY CHANNEL Projects Project State(s) Dwarfseahorse(PE) 2 Galveston SWD HOUSTON SHIP CHANNEL (0007780) TX X 8 Galveston

US Army Corps of Engineers

385

Program or Field Office: Office of Legacy Management Project Title and I.D. No.: Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida, LM 13-13 Location: Largo, Florida Proposed Action or Project Description: DOE proposes to use a Geoprobe to inject emulsified edible soybean oil (EEO) and anaerobic microbial solution into the surficial aquifer at the 4.5 Acre Site adjacent to the DOE Young - Rainey STAR Center (Pinellas Site) in Largo, Florida. The proposed action would enhance naturally occurring anaerobic biodegradation, thereby reducing vinyl chloride contamination along the southwest boundary of the 4.5 Acre Site. Dehalococcoides ethenogenes (DHE) is a type of microbe that occurs naturally in the aquifer. Bioaugmentation with a commercially available DHE culture used in conjunction with the EEO would maximize the efficiency of contaminant biodegradation. No genetically engineered or

386

TRIBAL ISSUES TOPIC GROUP MEETING SUMMARY JACKSONVILLE, FL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

JACKSONVILLE, FL JACKSONVILLE, FL JANUARY 20, 1999 Mr. Kevin Blackwell (USDOT/FRA) updated the group on the status of the DOT response to DOE's inquiry about the tribal right to inspect rail shipments. The response was in the final stages of review in the General Counsel's office and is expected by July 1999. The Group has added a representative from the NRC General Counsel's office, as a topic group member, to help keep abreast of developments in the NRC's upcoming draft rulemaking regarding tribes and advanced notification. The group also discussed the research that has been conducted on the issue of developing a "umbrella grant" from DOE to states and tribes. Tribes concerns differ from State concerns because of disparities in available infrastructure to administer grants and funding equity issues.

387

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

388

ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT (EECBG) - BETTER BUILDINGS NEIGHBORHOOD PROGRAM AT GREATER CINCINNATI ENERGY ALLIANCE Project Title: Home Performance with Energy Star and Better Buildings Performance  

SciTech Connect

The Greater Cincinnati Energy Alliance (Energy Alliance) is a nonprofit economic development agency dedicated to helping Greater Cincinnati and Northern Kentucky communities reduce energy consumption. The Energy Alliance has launched programs to educate homeowners, commercial property owners, and nonprofit organizations about energy efficiency opportunities they can use to drive energy use reductions and financial savings, while extending significant focus to creating/retaining jobs through these programs. The mission of the Energy Alliance is based on the premise that investment in energy efficiency can lead to transformative economic development in a region. With support from seven municipalities, the Energy Alliance began operation in early 2010 and has been among the fastest growing nonprofit organizations in the Greater Cincinnati/Northern Kentucky area. The Energy Alliance offers two programs endorsed by the Department of Energy: the Home Performance with ENERGY STAR Program for homeowners and the Better Buildings Performance Program for commercial entities. Both programs couple expert guidance, project management, and education in energy efficiency best practices with incentives and innovative energy efficiency financing to help building owners effectively invest in the energy efficiency, comfort, health, longevity, and environmental impact of their residential or commercial buildings. The Energy Alliance has raised over $23 million of public and private capital to build a robust market for energy efficiency investment. Of the $23 million, $17 million was a direct grant from the Department of Energy Better Buildings Neighborhood Program (BBNP). The organizations investments in energy efficiency projects in the residential and commercial sector have led to well over $50 million in direct economic activity and created over 375,000 hours of labor created or retained. In addition, over 250 workers have been trained through the Building Performance Training Center, a program that was developed and funded by the Energy Alliance and housed at Cincinnati State Technical and Community College. Nearly 100 residential and commercial contractors currently participate in the Energy Alliances two major programs, which have together served over 2,800 residential and 100 commercial customers. Additionally, the Energy Alliance established loan programs for homeowners, nonprofits and commercial businesses. The GC-HELP program was established to provide up to ten year low interest, unsecured loans to homeowners to cover the energy efficiency products they purchased through the Energy Alliance approved contractor base. To date the Energy Alliance has financed over $1 million in energy efficiency loans for homeowners, without any loans written off. The nonprofit business community is offered five year, fixed-interest rate loans through the Building Communities Loan Fund of $250,000. Additionally, the Energy Alliance has developed GC-PACE, a commercial financing tool that enables buildings owners to finance their energy upgrades through voluntary property assessments deploying low-interest extended-term capital from the bond market. The Energy Alliance and its partners are actively evaluating additional market-based financing solutions.

Holzhauser, Andy; Jones, Chris; Faust, Jeremy; Meyer, Chris; Van Divender, Lisa

2013-12-30T23:59:59.000Z

389

Flyer, Title VI  

Energy.gov (U.S. Department of Energy (DOE))

Titles VI and IX of the Civil Rights Act of 1964, as amended prohibit discrimination in programs and activities receiving Federal financial assistance.

390

US. DFPARThITNT OFFNERGY EERE PROJECT MANAG EM ENT CENTER NFPA DFTElU\llNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DFPARThITNT OFFNERGY DFPARThITNT OFFNERGY EERE PROJECT MANAG EM ENT CENTER NFPA DFTElU\llNATION RECIPIENT:Advanced Magnet Lab, Inc. STATE: FL PROJECT TITLE: A Lightweight, Direct Drive, Fully Superconducting Generator for Large Wind Turbines Page lof3 Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number DE-FOA-Q000439 DE-EEOOO5140 GF()'{)()()S1 40-002 G05140 Based on my review orlbe information concerning tbe proposed action, as NEPA Compliance Officer (authorized under DOE Order 4St.IA),. bave made the following determination: ex. EA, EIS APPENDIX AND NUMBE R: Description: A9 Information gathering, analysis, and dissemination Information gathering (including, but not limited to, literature surveys, inventories, site visits, and

391

IH'.O), u.s. DEP.-'.RT1IENT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IH'.O), IH'.O), u.s. DEP.-'.RT1IENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERl\JINATION RECIPIENT:City of Orlando PROJECT TITLE : City of Orlando - SOW (S) Page 1 of2 STATE: FL Funding Opportunity Announcement Numbu DE·FOA-QOOOO13 Procurement Instrument Number DE-EEOOOO779 NEPA Control Number ell> Number o Based on my review of the infonnation concerning the proposed adiou, as NEPA Compliance Officer (authoriud under DOE Order 451.1A), I have made the following determination: ex, EA, [IS APPENDIX AND NUMBER: Description: B5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentra tions of potentially harmful substances. These actions may involve financial and technical

392

PMC·F.F2a u.s. DEPARTl'dENT OF ENERG Y EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a a u.s. DEPARTl'dENT OF ENERG Y EERE PROJECT MANAGEMENT CENTER NEPA DETERlYIINATION REC1PI ENT:Lee, County of PROJECT TITLE: eecgb block grant - Activity #8 Sio-Diesel Page I of 2 STATE: FL Funding Opportunity Anno uncement Number Procurement Instr ument Number NEPA Control Number em Number OE-FOA-0000013.001 DE-EE 0000787.001 0 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination: ex, EA, [ IS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy. demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

393

CSCE4610: Project Grading Sheet (Krishna Kavi)  

E-Print Network (OSTI)

CSCE4610: Project Grading Sheet (Krishna Kavi) Assumption: A report on one or more commercially available architecture Student Name: _____________________________________________ Project Title. are used to determine the difficulty of the project 2. Project Details 60% Completeness Identification

Kavi, Krishna

394

S M Stoller Star Center-B100 Monthly/Effluent; Largo, FL  

Office of Legacy Management (LM)

B100 Monthly/Effluent; Largo, FL B100 Monthly/Effluent; Largo, FL 7030-226 Accutest Job Number: F30882 Sampling Date: 04/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

395

S M Stoller Star Center-B100 Monthly/Effluent; Largo, FL  

Office of Legacy Management (LM)

B100 Monthly/Effluent; Largo, FL B100 Monthly/Effluent; Largo, FL 7030-226 Accutest Job Number: F29123 Sampling Date: 01/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

396

S M Stoller STAR Center- 4.5 Acre Site, Largo, FL  

Office of Legacy Management (LM)

STAR Center- 4.5 Acre Site, Largo, FL STAR Center- 4.5 Acre Site, Largo, FL 110406202 Accutest Job Number: F25243 Sampling Date: 07/06/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

397

S M Stoller STAR Center- 4.5 Acre Site, Largo, FL  

Office of Legacy Management (LM)

STAR Center- 4.5 Acre Site, Largo, FL STAR Center- 4.5 Acre Site, Largo, FL 7030-226/Monthly Accutest Job Number: F27168 Sampling Date: 10/05/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

398

S M Stoller Star Center-B100 Monthly/Effluent; Largo, FL  

Office of Legacy Management (LM)

B100 Monthly/Effluent; Largo, FL B100 Monthly/Effluent; Largo, FL 7031-226 Accutest Job Number: F35493 Sampling Date: 10/04/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

399

S M Stoller STAR Center- 4.5 Acre Site, Largo, FL  

Office of Legacy Management (LM)

STAR Center- 4.5 Acre Site, Largo, FL STAR Center- 4.5 Acre Site, Largo, FL 110406202 Accutest Job Number: F23552 Sampling Date: 04/20/04 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable. Harry Behzadi, Ph.D.

400

Module Title: Project Module Code: OPTO6005  

E-Print Network (OSTI)

Ibsen, Dr Ping Hua, Prof James Wilkinson Contact (email ID) sm@orc.soton.ac.uk, mi@orc.soton.ac.uk, ph2@orc.soton.ac.uk, jsw@orc.soton.ac.uk Is the module subject to external accreditation? No If yes and optical labs of the ORC 3. Train in technical and hands-on research skills to gain technical insight

Anderson, Jim

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

u.s. DEPARTMENT OF ENERGY EERE PROJECT MA..\IAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IAGEMENT CENTER IAGEMENT CENTER NEPA DE1'ElUIllNATION RECIPIENT: Prolec fuel Management STATE: FL PROJECT TITLE: flash Foods Job Creation and Petroleum Independence for higher ethanol blends Page 1 of2 Funding Opportunity Announce-ment Number Procuremenlln$lrument Number NEPA Control Number CID Number DE-FOA-OOOOO12S DE-EEOOO3053 GFO-OOO3053-005 0 Based on my review orlhe information concerning the proposed aClion, as NEPA Compliance Officer (authorized under DOE Order 45LIA).1 have made the (ollowlng determination: ex, EA, [IS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical

402

u.s DI!P.-\RTlIII!NT OF ENERGY EERE PROJECT MANAGEMENT CENTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DI!P.-\RTlIII!NT OF ENERGY DI!P.-\RTlIII!NT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DI11'FlU.fiNATION RECIPIENT:Vennont Sustainable Jobs Fund PROJECf TITLE : Vennont Biofuels Initiative: Borderview Farm CDP09 Page 1 of2 STATE: VT Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number elD Number DE· FG36-08G088182 GFQ-G088182-021 G088182 Based on my review of the information concerning the proposed action, as NtPA Compliance Officer (authorized under DOE Order 451.1A). I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 8 5.1 Actions to conserve energy, demonstrate potential energy conservation, and promote energy-efficiency that do not increase the indoor concentratIOns of potentially harmful substances. These actions may Involve financial and technical

403

u.s DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NFPA DFnru.nNATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NFPA DFnru.nNATION NFPA DFnru.nNATION Page 1 of2 RECIPIENT:City of S1. Petersburg/Attn: JON PLUMB STATE: FL PROJECf TITLE : Solar Parks Project "unding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number CIO Number COP DE·EEOOO0284 GFQ-0000284-OO5 GO Based on my review oflhe information conceming the proposed action, as NEPA Compliance Officer (authorized under DOE Order 451.1A), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: 85.16 Solar photovoltaic systems The installation, modification, operation, and removal of commercially available solar pholovoltaic systems located on a building or other structure (such as rooftop, parking lot or facility, and mounted to signage, lighting, gates, or fences), or if located on land, generally comprising less than 10 acres within a previously

404

u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETERlVIINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DETERlVIINATION DETERlVIINATION RECIPIENT:Florida Atlantic University PROJECT TITLE: National Open-ocean Energy Laboratory Page 1 of2 STATE: FL Funding Opportunity Announcement Number Pn>c'urement Instrument Nu mber NEPA Co ntrol Nu mbfor CID Number 2009/2010 COP DE-EEOOOO319 GF()...()()IX)319-003 G0319 Based on my review ofthc informa tion concerning the proposed action, as NEPA C ompliance Officer (authorized under DOE OTder 45I.1A), I have made the following determination: ex, EA. [IS APPENDIX AND NUMBER: Description : A9 Information gathering, analysis, and dissemination Rational for determination: Information gathering (indudlng but not limited to, literature surveys, Inventories, SIte VISits, and audits) . data analysis (indudlrl9, but not limited 10, computer modeling)

405

E-Print Network 3.0 - aurigae fl lyrae Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Search Sample search results for: aurigae fl lyrae Page: << < 1 2 3 4 5 > >> 1 Astronomy C Tiger Invitational February 20, 2010 Summary: Astronomy C Tiger Invitational...

406

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title IX, Subtitle J (EPAct Title IX, Subtitle J (EPAct 2005) Complementary Program - Office of Research and Development September 2008 2 3 Complementary Program NETL - ORD * Areas of research - Drilling Under Extreme Conditions - Environmental Impacts of Oil and Gas - Enhanced and Unconventional Oil Recovery - Resource Assessment * Institute for Advanced Energy Solutions - West Virginia University, Carnegie-Mellon University, and University of Pittsburgh * Penn State University and Oregon State University 4 Drilling Under Extreme Conditions * Ultra-deep single cutter drilling simulator - Recreates bottom-hole drilling environment of ultra-deep wells (30,000 psi and 481 o F) - Delivered to NETL later this year - Operates with real drilling fluids - X-ray video system images cuttings - Verify the results of the full bit

407

ProjectRanking(Economic) Division Potentially Impacted USACE Navigation Projects  

E-Print Network (OSTI)

Galveston SWD TEXAS CITY SHIP CHANNEL, TX (0018130) TX X 101 Galveston SWD MATAGORDA SHIP CHANNEL (0010810) TX X 115 Galveston SWD TEXAS CITY CHANNEL (50-FOOT PROJECT), TX - 010183 (CG) (0010183) TX X 130, FL, MS X 92 Mobile SAD PASCAGOULA HARBOR (0013680) MS X 2 Galveston SWD HOUSTON SHIP CHANNEL (0007780

US Army Corps of Engineers

408

Global Environmental Course Title  

E-Print Network (OSTI)

Department Global Environmental Studies Room Course Title Frontier of Sustainability Science Instructor Akihisa MORI, Global Environmental Studies Satoshi KONISHI, Institute of Advanced consisting from a variety of academic field, including philosophy, politics, economics, energy, architecture

Takada, Shoji

409

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

410

LM's New Role for the DOE Title X Reimbursement Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program October 16, 2012 - 10:01am Addthis LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program LM's New Role for the DOE Title X Reimbursement Program What does this project do? Goal 4. Optimize the use of land and assets Title X of the Energy Policy Act of 1992 authorized U.S. Department of Energy (DOE) to reimburse licensees of 1 thorium and 13 uranium processing sites (Figure 1) for a portion of their remedial action costs attributable

411

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Research and Development Research and Development Project Review Meeting Presenter: John Litynski, PE United States Department of Energy, National Energy Technology Laboratory, U.S. DOE Office of Fossil Energy National Energy Technology Laboratory August 21-23, 2012 Pittsburgh, PA 2 WELCOME 3 * Annual requirement in all cooperative agreements and grants * First complete program review of 126 carbon storage projects - 7 Regional Partnerships (Large scale injection projects) - 14 Infrastructure (Injection, Characterization, systems modeling) - 38 Geologic Storage - 28 Simulation and Risk Assessment - 26 Monitoring, Verification, and Accounting (MVA) - 6 CO2 Use and Reuse - 7 Training Centers * Report on technical progress and financial status of projects * 55 Posters

412

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO CO 2 Storage Resource Methodologies Presenter: Angela Goodman Team: Angela Goodman, Grant Bromhal, Brian Strazisar, Traci Rodosta and George Guthrie United States Department of Energy, National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS August 21-23, 2012 Pittsburgh, PA 2 U.S. DEPARTMENT OF ENERGY  OFFICE OF FOSSIL ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY CARBON STORAGE PROGRAM with ARRA Projects Benefits Global Collaborations Technology Solutions Lessons Learned North America Energy Working Group Carbon Sequestration Leadership Forum International Demonstration Projects Canada (Weyburn, Zama,

413

Project Website Information Architecture  

E-Print Network (OSTI)

Project Website Information Architecture Overview Purpose: To describe up front what your initiative/project does. This section does not need to literally be called "Overview;" you can come up with anther suitable title that is more specific to your project. Examples of what to include: Information

414

TITLE48CHAPTER9  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS TITLE 48 CHAPTER 9 CODE OF FEDERAL REGULATIONS DEPARTMENT OF ENERGY ACQUISITION REGULATION TABLE OF CONTENTS Subchapter A - General 901 - Federal Acquisition Regulations System 902 - Definitions of words and terms 903 - Improper business practices and personal conflicts of interest 904 - Administrative matters Subchapter B - Acquisition Planning 905 - Publicizing contract actions 906 - Competition requirements 908 - Required sources of supplies and services 909 - Contractor qualifications 911 - Describing Agency needs 912 - Acquisition of Commercial Items Subchapter C - Contracting Methods and Contract Types 913 - Simplified acquisition procedures 914 - Sealed bidding 915 - Contracting by negotiation 916 - Types of contracts

415

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Wellbores and Drilling Wellbores and Drilling Brian Strazisar NETL Title, Date ‹#› Technology or Capability Overview * 3 primary efforts related to wellbore cement - Risk of wellbore leakage in CO 2 storage/EOR - Stability of foamed cements in deep offshore wells - Shallow gas migration in shale gas wells * Extreme Drilling Laboratory (XDL) - NETL Facility to study drilling processes under conditions that exist at extreme depths ‹#› CO 2 and Wellbore Leakage Risk * Early NETL work defined mechanism for chemical reaction between CO 2 and wellbore cement. * Degradation of cement determined to be too slow to impact well integrity in the absence of preexisting flow paths CaCO 3(s) barrier (2) Degraded Zone (3) Propagation of Fronts Ca(OH) 2 depleted zone (1)

416

CSCE3030: Project Grading Sheet (Krishna Kavi)  

E-Print Network (OSTI)

CSCE3030: Project Grading Sheet (Krishna Kavi) Student Name: _____________________________________________ Project Title: _______________________________________________ 1.Problem Difficulty 15% Originality, material from outside of the class new concepts, etc. are used to determine the difficulty of the project 2

Kavi, Krishna

417

Mechanism of Nitric Oxide Reactivity and Fluorescence Enhancement of the NO-Specific Probe CuFL1  

E-Print Network (OSTI)

The mechanism of the reaction of CuFL1 (FL1 = 2-{2-chloro-6-hydroxy-5-[(2-methylquinolin-8-ylamino)methyl]-3-oxo-3H-xanthen-9-yl}benzoic acid) with nitric oxide (NO) to form the N-nitrosated product FL1-NO in buffered ...

McQuade, Lindsey E.

418

NIF-0607-13692.ppt NIF Town Hall Meeting, June 16, 2007 1 Title page -APS, Orlando, FL, November 13,  

E-Print Network (OSTI)

· The NIF laser and the equipment needed for ignition experiments, including high quality targets: · The ignition laser generates hot electrons that propagate through to the dense fuel and deposit their energy 2 The National Ignition FacilityThe National Ignition Facility Limitless Clean Energy Eye

419

u.s. DEPARUIENT OE ENERGY EERE PROJECT MANAGEMENT CENTER NEV...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENERGY EERE PROJECT MANAGEMENT CENTER NEV. DETERlIINATION RECIPI": NT:Ocean Renewable Power Company PROJECT TITLE: TidGen Power System Commercialization Project Pagelof3 STATE:...

420

Project Number: IST-2001-33100 Project Acronym: PROFUNDIS  

E-Print Network (OSTI)

and achievements . . . . . . . . . . . . . . 15 3 Project management and coordination 15 4 Cost breakdown 15 5Project Number: IST-2001-33100 Project Acronym: PROFUNDIS Title : Proofs of Functionality;cation: Public Contract start date 1 January 2002 Duration: 3 years Project co-ordinator: Joachim Parrow

Parrow, Joachim

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Project Number: IST-2001-33100 Project Acronym: PROFUNDIS  

E-Print Network (OSTI)

and achievements . . . . . . . . . . . . . . 17 3 Project management and coordination 17 4 Cost breakdown 17 5Project Number: IST-2001-33100 Project Acronym: PROFUNDIS Title : Proofs of Functionality Classification: Public Contract start date 1 January 2002 Duration: 3 years Project co-ordinator: Joachim Parrow

Parrow, Joachim

422

Geysers Project Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Geothermal Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Geysers Project Geothermal Project Project Location Information Coordinates 38.790555555556°, -122.75583333333° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.790555555556,"lon":-122.75583333333,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

423

Report Title: Mapping  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: Title: Mapping of Reservoir Properties and Facies Through Integration of Static and Dynamic Data Report Type: Final Technical Report Reporting Period Start Date: October 1, 2000 Reporting Period End Date: September 30, 2004 Principal Authors: Albert C. Reynolds, Dean S. Oliver, Yannong Dong, Ning Liu, Guohua Gao, Fengjun Zhang & Ruijian Li Date Report Issued: December 2004 DOE Award Number: DE-FC26-00BC15309 Petroleum Engineering Department The University of Tulsa 600 South College Avenue Tulsa, Oklahoma 74104 This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

424

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Traditional Research and NETL Traditional Research and NETL Complementary Research Portfolio September 25, 2012 Alexandra Hakala Technical Coordinator, Shale Gas Office of Research and Development National Energy Technology Laboratory 2 Maximizing Benefits 9 Projects Resource Characterization 12 Projects Production Optimization Department of Energy Office of Fossil Energy Industry Consortium RPSEA Complementary Research Appropriated Funded Program (Extramural) @ NETL Minimizing Impacts 10 Projects Water Treatment 4 Projects Water Resources Mgmt 2 Projects Impact Mitigation and Decision-making 3 Current Appropriated Program Drivers: Secretary of Energy Advisory Board - Recommendations for Federal Agencies * Enhance the quality and quantity of public

425

International Journal of Foundations of Computer Science fl World Scientific Publishing Company  

E-Print Network (OSTI)

International Journal of Foundations of Computer Science c fl World Scientific Publishing Company Science, University of Idaho Moscow, Idaho 83844­1010, USA and MOSHE DROR MIS Department, University

Krings, Axel W.

426

Category:Projects | Open Energy Information  

Open Energy Info (EERE)

2 subcategories, out of 2 total. P Private Sectors Public Sectors Retrieved from "http:en.openei.orgwindex.php?titleCategory:Projects&oldid272216...

427

Modeling Methodology for Component Reuse and System Integration for Hurricane Loss Projection Application  

E-Print Network (OSTI)

Modeling Methodology for Component Reuse and System Integration for Hurricane Loss Projection Distributed Multimedia Information System Laboratory School of Computing and Information Sciences Florida International University, Miami, FL 33199, USA 2 Department of Finance Florida International University, Miami

Chen, Shu-Ching

428

Economic Contributions of the Turfgrass Industry Final Project Report to the Florida Turfgrass Association  

E-Print Network (OSTI)

Economic Contributions of the Turfgrass Industry in Florida Final Project Report to the Florida of Food and Agricultural Sciences Food and Resource Economics Department Gainesville, FL Corresponding.....................................................................................................................................................21 Economic Contribution Analysis

Florida, University of

429

Title of Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Title of Presentation Title of Presentation More Documents & Publications Cybersecurity for Energy Delivery Systems 2010 Peer Review Presentations - Software Engineering...

430

Title Line 2 Commercialization at the  

E-Print Network (OSTI)

-exclusive or exclusive license (royalty free or royalty bearing) ­ Researchers sign acknowledgment #12;Title Title Line 2

Czarnecki, Krzysztof

431

Title Slide Examples  

NLE Websites -- All DOE Office Websites (Extended Search)

measures * Multi-fuel, performance based * Total energy use performance period * Target EUI vs. actual * Piloting in deep retrofit program * 6 projects in pilot Construction...

432

Project Year Spring 2009  

E-Print Network (OSTI)

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

433

Project Documentation Group Members  

E-Print Network (OSTI)

agencies to track client services and outcomes, thus providing sound documentation that justifies stateCSC 4330 Project Documentation 11/30/2009 Group Members: Andy Bursavich Justin Farr Will Folse Chris Miceli Michael Miceli #12;Group Answers I. The Title ­ UREC Client Tracking System II. The project

Kundu, Sukhamay

434

Presentation title goes here  

NLE Websites -- All DOE Office Websites (Extended Search)

Future of DR Future of DR March 3, 2011 Sila Kiliccote, Mary Ann Piette, Dave Watson, Rish Ghatikar Deputy, DRRC Program Manager, LBNL SKiliccote@lbl.gov 2 Presentation Overview * Trends * Policy * Technology * Implementations * Load As Resource in Ancillary Services Markets * Future directions towards responsive buildings 3 Trends Policy Dynamic Rates - Large C&I, residential, small commercial Codes and Standards -Title 24, US Green Building Council's LEED Credits Smart Grid Standards effort Ancillary Services Technology Integration of Renewables Energy Storage Technologies - Can DR replace storage? PHEVs and EVs Implementation Linking Energy Efficiency and DR Utility Implementations Smart Grid Investment and Demonstration Grants 4 Demand Side Management and Automated DR Future

435

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Sequestration Program Sequestration Program Sean I. Plasynski, PhD Sequestration Technology Manager November 12, 2009 Mostly CO 2 CO 2 Mostly H 2 Mixed Gas Stream and other gases 2 Key Challenges to Carbon Capture and Storage *Capture Technology - Existing Plants - New Plants (PC) - IGCC *Cost of CCS *Sufficient Storage Capacity *Permanence *Best Practices - Storage Site Characterization - Monitoring/Verification - Site Closure - Etc etc ... *Regulatory Framework - Permitting - Treatment of CO 2 *Infrastructure *Human Capital *Legal Framework - Liability - Ownership * pore space * CO 2 *Public Acceptance (NIMBY  NUMBY) Technical Issues Legal/Social Issues Projects helping to address both categories of issues 3 PC Boiler (With SCR) Sulfur Removal Particulate Removal Ash Coal 7,760 TPD STEAM CYCLE CO 2 Capture Process* ID Fan Air

436

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Atlas II Atlas II Dawn M. Deel Project Manager - Carbon Sequestration 2 Atlas I - Background and Statistics * 2007 - DOE released the first version of the Carbon Sequestration Atlas of the U.S. and Canada * Result of cooperation and coordination among carbon sequestration experts from local, state, and government agencies, as well as industry and academia * Atlas presented the first coordinated assessment of carbon capture and storage (CCS) potential across the majority of the U.S. and portions of western Canada * Over 3,000 hardcopies released * 1,000 CDs mailed * Daily downloads from NETL website * Widespread media and industry attention * Continued public interest 3 Atlas II * Scheduled for release in November 2008 (GHGT9) * Purpose of this update: To update the CO 2 storage portfolio, document differences in CO

437

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

R&D Introduction R&D Introduction Briggs M. White Project Manager National Energy Technology Laboratory United States Department of Energy July 28, 2010 11 th Annual SECA Workshop, Pittsburgh PA 2 SOFC Anode SOFC Cathode air Atmospheric SOFC Oxy-Comb Heat Recovery oxygen CO 2 Condenser CO 2 Compressor & dryer stack gas expander Water Recycle SECA Coal-Based Atmospheric IGFC blower * Atmospheric SOFC with catalytic gasification 25 % Methane * Separate Fuel and Air Streams: Oxy Combustion * Cycle Efficiency (HHV); 99% Capture  ~51% with CO2 Compression  ~54% w/out CO2 Compression air ASU Gas Cleaning (Dry or WGCU) air N 2 coal oxy-comb O 2 Catalytic Gasification CH 4 O 2 CO, H 2 , CH 4 expander 3 SOFC Operating Conditions for Coal Plants Fuel IN Air OUT Fuel OUT Air IN Temperature Model High system efficiency is a key target

438

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Partnership Annual Meeting Partnership Annual Meeting Terrestrial Best Practices Manual Sean I. Plasynski, PhD Sequestration Technology Manager November 16, 2009 Mostly CO 2 CO 2 Mostly H 2 Mixed Gas Stream and other gases 2 BSCSP WESTCARB SWP PCOR MGSC MRCSP SECARB Terrestrial Project Categorization Agricultural soils Soil Reclamation Afforestation Accounting/Aggregation Wetlands Reclamation J A B C D E F G I H K Terrestrial Field Tests - Tree-plantings - No-till farming - Wetlands restoration - Land management: grasslands, grazing lands - Fire management - Forest preservation - Monitoring, mitigation, and verification technologies 3 CCS Best Practice Manuals Critical Requirement For Significant Wide Scale Deployment Capturing Lessons Learned Best Practice Manual Version 1 (Phase II) Version 2 (Phase III) Final Guidelines

439

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Sequestration Atlas of the Carbon Sequestration Atlas of the United States and Canada Dawn Deel, Project Manager, Sequestration Division October 5, 2010 2 Background and Statistics Atlas I - March 2007 * First coordinated assessment of CCS in the US and Canada * Provided maps showing number, location and magnitude of CO 2 sources * Maps showing areal extent of geologic storage sites * Storage potential by Partnership * Digital Atlas developed * Over 3,000 hardcopies released: 1,000 CDs mailed * Daily downloads from NETL website Atlas II - November 2008 * Updated the CO 2 storage portfolio * Documented differences in CO 2 resource and CO 2 capacity * Provided CO 2 emission estimation for stationary sources * Described Interagency collaboration * Illustrated federal lands CO 2 geologic storage potential

440

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

the Nation the Nation US Army Corps US Army Corps of Engineers of Engineers Tenkiller Tenkiller Auxiliary Auxiliary Spillway Project Spillway Project Project Scope: Phase 1 provide a new auxiliary spillway with 5 tainter gates, and maint. bridge Phase 2 construct a new highway bridge, remove the plug and re-water. Phase 1 Started: July 1999 Phase 1 Completed: December 2003 Phase 2 Started: March 2004 Scheduled Completion Date: August 2006 One Corps Serving The Army and the Nation US Army Corps US Army Corps of Engineers of Engineers Total Project Cost: $39.9M Phase 1 Construction Costs: 22.3M Phase 2 Construction Costs: $6.5M Remaining Activities: Complete permanent electrical connections to the substation. Complete stop logs. Tenkiller Tenkiller Auxiliary Auxiliary Spillway Project

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Staff Recommendations for Remaining Projects in the RME/AP Category Review 5/18/2011 # Task1 SubCat ProjNum Title Sponsor ISRPRec BiOp Accord FY12Req BPA  

E-Print Network (OSTI)

199506425 Policy, Plan and Technical Support of Washington Department of Fish and Wildlife (WDFW)-Yakima/Klickitat Fisheries Project (YKFP) Washington Department of Fish and Wildlife (WDFW) Yes (Qualified) $197,917 Art 2012; project to wind down for close out within FY 2012. 102 B AP 200203100 Growth Modulation in Salmon

442

J31317-1 Fl_L2 Final Report  

Office of Legacy Management (LM)

31317-1 31317-1 Job Description: Star Center Semiannual For: S.M. Stoller Corporation 2597 B 3/4 Road Grand Junction, CO 81503 Attention: Mr. Charles Tabor _____________________________________________ Approved for release. Nancy Robertson Project Manager II 9/9/2009 2:36 PM Nancy Robertson Project Manager II nancy.robertson@testamericainc.com 09/09/2009 Methods: FDEP, DOH Certification #: TestAmerica Tampa E84282 These test results meet all the requirements of NELAC unless specified in the case narrative. All questions regarding this test report should be directed to the TestAmerica Project Manager who signed this test report. The estimated uncertainty associated with these reported results is available upon request. The results contained in this test report relate only to these samples included herein.

443

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Presented by: Mark Steele: Ex WAGR Project Manager Decommissioning of Windscale Advanced Gas-Cooled Reactor (WAGR) Slide 2 Introduction * UK policy for nuclear power plant decommissioning is long-term safe- storage of reactor facilities * WAGR Project is being used to demonstrate that such a plant can be fully decommissioned * Project funded by the UK Government * Windscale Licensee UKAEA * During early and mid 1990"s facility modified and construction of Reactor Dismantling Machine and Waste Route * 1999 contract let for the dismantling of the reactor to Magnox Electric - fixed price * Scope included engineering and design, safety submission, provision of equipment and operations

444

Policy Procedure Administrative Directive Title: _____________________________________  

E-Print Network (OSTI)

Policy ­ Procedure ­ Administrative Directive Title: _____________________________________ Policy-President _____________ See also: Related Policies, Procedures and Agreements: Relevant Legislation and Regulations: ____________________________________________________________________________ Background and Purpose: ____________________________________________________________________________ Policy

Northern British Columbia, University of

445

Title 44 Excerpts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Excerpts 4 Excerpts The United States Code - Title 44 PUBLIC PRINTING AND DOCUMENTS And Miscellaneous Statutes Identify the Authority of the Joint Committee on Printing 1997 EDITION CHAPTER 5 - PRODUCTION AND PROCUREMENT OF PRINTING AND BINDING Section 501. Government printing, and blank-book work for Congress, the Executive Office, the Judiciary, other than the Supreme Court of the United States, and every executive department, independent office and establishment of the Government, shall be done at the Government Printing Office, except- (1) classes of work the Joint Committee on Printing considers to be urgent or necessary to have done elsewhere; and (2) printing in field printing plants operated by an executive department, independent office of establishment, and the procurement of printing by an executive department,

446

Active Project Justification Statements  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Justification Statements Project Justification Statements Date Received PJS Number Title Owner / Author Status ORG Due Date 10/26/2012 PJS-2012-007 Cost Benefit Analysis for Nuclear Facility Accident Prevention or Mitigation Design Options, Project Justification 1/9/2013 PJS-2013-01 DOE HDBK of Optimizing Radiation Protection of the Public and the Environment 6/24/2013 PJS-2013-03 Review and Approval of Nuclear Facility

447

Work Authorization Document NSTX Upgrade Project  

E-Print Network (OSTI)

Work Authorization Document NSTX Upgrade Project Control Account #: 1302 Title: WBS 1.1.11 Title Functional Manager P. Heitzenroeder Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS and includes design modifications and upgrade of the coil assembly stand; procedures for assembling the Center

Princeton Plasma Physics Laboratory

448

Work Authorization Document NSTX Upgrade Project  

E-Print Network (OSTI)

Work Authorization Document NSTX Upgrade Project Control Account #: 7900 Title: WBS 1.7.3 Title Functional Manager L. Dudek Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS Dictionary procedures and documents to support the integrated tests, and to support performance of the pre

Princeton Plasma Physics Laboratory

449

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Successful Risk Management Successful Risk Management Lessons Learned from the Spallation Neutron Source Suzanne Herron U.S. ITER Deputy Project Manager Former SNS Project Controls Manager The Spallation Neutron Source (SNS) achieved world-class objectives * Construction completed ahead of schedule (June 2006) and under budget ($1.411B) * World's leading facility for neutron science * Room for eventual 25 instruments spanning physics, chemistry, biology, and materials science * Upgradeable to higher power, second target SNS was a partnership among six national labs and a major industrial partner SNS partners owned major scope, budget, and risk! Total Project $1411.7M Argonne National Laboratory Brookhaven National Laboratory Thomas Jefferson National Accelerator Laboratory Legend ANL 45.6 BNL 137.1

450

Title IX | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IX IX Title IX Title IX of the Education Amendments of 1972, as amended, prohibits discrimination on the basis of sex in all educational programs and activities of institutions that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the basis of sex, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any education program or activity receiving federal financial assistance. Click here to learn more: 20 U.S.C. § 1681(a) The Office of Civil Rights is responsible for monitoring and enforcing compliance with Title IX, investigating Title IX-related complaints, and providing technical assistance related to Title IX to recipients of Department of Energy financial assistance.

451

INSERT PRESENTATION TITLE HERE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S. Department of Energy S. Department of Energy National Electric Transmission Congestion Study Workshop Saint Louis, Missouri December 8, 2011 Maureen A. Borkowski President & CEO, Ameren Transmission Company 2 CONGESTION IN THE MIDWEST * Midwest ISO performs regular congestion studies looking at historical and expected future congestion - Top Congested Flowgate Study - Cross-Border Congested Flowgates (with PJM) * Significant congestion exists in several areas - Southeast Missouri, Southern Illinois and Indiana - Chicago area, Southern Wisconsin and Northern Indiana surrounding Lake Michigan - Indiana and Kentucky border * Historically, dozens of transmission projects were evaluated to mitigate congestion on the top congested flowgates - RECB II Benefit/Cost Threshold was used - Only one small project passed the criteria

452

FUELS NETL Team Technical Coordinator: Dirk Link Name Title  

NLE Websites -- All DOE Office Websites (Extended Search)

NETL Team Technical Coordinator: Dirk Link NETL Team Technical Coordinator: Dirk Link Name Title Affiliation Dogan, Omer N Materials Research Eng NETL Haynes, Daniel ST (Chem Eng) NETL How ard, Bret H Research Chemist NETL Link, Dirk D Research Chemist NETL Morreale, Bryan D General Engineer NETL Poston, James A Physicist NETL Shekhaw at, Dushyant General Engineer NETL Smith, David K Physical Science Tech NETL Sorescu, Dan C Research Physicist NETL Ciocco, Mike Project Lead URS Smith, Mark Project Lead URS Abdelsayed, Victor Research Scientist URS Floyd, Donald Scientist URS Smith, Mark Research Engineer URS Name Project Role Affiliation University Project Title Veser, Goetz PI Pitt Task 221 Development of Catalysts for Coal-gas Component Conversion Enick, Robert M PI Pitt Task 331 Membrane Reaction Process for Conversion of Coal-Gas Components

453

3rd year final contractor report for: U.S. Department of Energy Stewardship Science Academic Alliances Program Project Title: Detailed Measurements of Rayleigh-Taylor Mixing at Large and Small Atwood Numbers  

SciTech Connect

This project had two major tasks: Task 1. The construction of a new air/helium facility to collect detailed measurements of Rayleigh-Taylor (RT) mixing at high Atwood number, and the distribution of these data to LLNL, LANL, and Alliance members for code validation and design purposes. Task 2. The collection of initial condition data from the new Air/Helium facility, for use with validation of RT simulation codes at LLNL and LANL. This report describes work done in the last twelve (12) months of the project, and also contains a summary of the complete work done over the three (3) life of the project. As of April 1, 2006, the air/helium facility (Task 1) is now complete and extensive testing and validation of diagnostics has been performed. Initial condition studies (Task 2) is also comp lete. Detailed experiments with air/helium with Atwood numbers up to 0.1 have been completed, and Atwood numbers of 0.25. Within the last three (3) months we have been able to successfully run the facility at Atwood numbers of 0.5. The progress matches the project plan, as does the budget. We have finished the initial condition studies using the water channel, and this work has been accepted for publication on the Journal of Fluid Mechanics (the top fluid mechanics journal). Mr. Nick Mueschke and Mr. Wayne Kraft are continuing with their studies to obtain PhDs in the same field, and will also continue their collaboration visits to LANL and LLNL. Over its three (3) year life the project has supported two(2) Ph.D.s and three (3) MScs, and produced nine (9) international journal publications, twenty four (24) conference publications, and numerous other reports. The highlight of the project has been our close collaboration with LLNL (Dr. Oleg Schilling) and LANL (Drs. Dimonte, Ristorcelli, Gore, and Harlow).

Malcolm J. Andrews

2006-04-14T23:59:59.000Z

454

SciTech Connect: The Mesaba Energy Project: Clean Coal Power...  

Office of Scientific and Technical Information (OSTI)

The Mesaba Energy Project: Clean Coal Power Initiative, Round 2 Citation Details In-Document Search Title: The Mesaba Energy Project: Clean Coal Power Initiative, Round 2 The...

455

INTRODUCTION Since Zadeh [20] introduced Fuzzy Sets, many discussions have taken place whether Fuzzy Logic (FL) deserves a place  

E-Print Network (OSTI)

Fuzzy Logic (FL) deserves a place in control theory. Three properties speak in favour of FL control larger than the true maximal input for a system, Fuzzy Logic Controllers (FLC) by nature restrict A j x µ j x ( ) NLQ THEORY BASED STABILITY ANALYSIS OF SISO FUZZY LOGIC CONTROLLERS J?RGEN VAN GORP

456

THE FLORIDA STATE UNIVERSITY * THE GRADUATE SCHOOL * 314 WESTCOTT * TALLAHASSEE, FL. 32306-1410 Florida State University  

E-Print Network (OSTI)

THE FLORIDA STATE UNIVERSITY * THE GRADUATE SCHOOL * 314 WESTCOTT * TALLAHASSEE, FL. 32306 to gs-drg@admin.fsu.edu: Florida State University The Graduate School 314 Westcott Building Tallahassee be carried over. #12;THE FLORIDA STATE UNIVERSITY * THE GRADUATE SCHOOL * 314 WESTCOTT * TALLAHASSEE, FL

457

THE FLORIDA STATE UNIVERSITY * THE GRADUATE SCHOOL * 408 WESTCOTT * TALLAHASSEE, FL. 32306-1410 Florida State University  

E-Print Network (OSTI)

THE FLORIDA STATE UNIVERSITY * THE GRADUATE SCHOOL * 408 WESTCOTT * TALLAHASSEE, FL. 32306 Fellowship ­ Fall 2011 408 Westcott Building Tallahassee, Florida 32306-1410 Deadline The application STATE UNIVERSITY * THE GRADUATE SCHOOL * 408 WESTCOTT * TALLAHASSEE, FL. 32306-1410 Fall 2011 ***FOUR

Bowers, Philip L.

458

Main Title 32pt  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Joint Energy Storage Joint Energy Storage Initiative November 2, 2010 Georgianne Huff Sandia National Laboratories Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Cooperation on ESS projects in New York * Demonstrate electric energy storage for increasing reliability and for electric energy management to be: - technically viable - cost-effective - broadly applicable Start: FY2005 DOE/NYSERDA MOU DOE/Sandia Activities * Assist in project selection process * Data Acquisition System Management - - EnerNex * Data and Economic Analysis - - Distributed Utilities Associates

459

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Wheat Ridge, CO 80033 * www.tda.com Wheat Ridge, CO 80033 * www.tda.com A Low Cost, High Capacity Regenerable Sorbent for Pre-Combustion CO 2 Capture Contract No: DE-FE0000469 Principal Investigator Gökhan Alptekin, PhD DOE Project Manager Ms. Sara Zenner Project Kick-off Meeting NETL, Pittsburgh, PA November 12, 2009 TDA R e s e a r c h 2  Privately Owned / Began operations in 1987  ~13 million revenue in 2009  84 full-time technical staff  Primarily chemists and engineers, more than half with advanced degrees (26 PhDs) TDA Research, Inc. Wheat Ridge Facility Golden Facility 12345-12355 W 52 nd Avenue 22,000 ft 2 offices and labs Synthetic Chemistry, Catalyst/Sorbent Synthesis and Testing, Machine and Electronics Shops, SEM, TOF Mass Spec 4663 Table Mountain Drive 27,000 ft 2 offices and labs

460

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BROOKHAVEN SCIENCE ASSOCIATES BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Risk Management Diane Hatton Associate Director, NSLS-II Project Support Division, BNL November 4, 2009 2 BROOKHAVEN SCIENCE ASSOCIATES Risk Management Steps * identify potential vulnerabilities/risks * determine their likelihood of occurring * assess their impact on the project technical, cost, and schedule baselines * determine activities that would reduce/mitigate the risk Consolidated risk entries to manageable numbers * execute a plan to accomplish these risk-reducing activities * risk reporting/tracking STEP 1 3 BROOKHAVEN SCIENCE ASSOCIATES Risk Management Steps * Bottom up Risk Analysis produced 407 Risk Register Entries * Mixture of risks (can be mitigated) and uncertainties (things beyond our control) * Repetition and redundancy (e.g. higher than usual inflation and exchange rate, out-year

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Revised 5/13/2014 TITLE IX STATEMENT  

E-Print Network (OSTI)

President of Student Affairs 313 Westcott Building, Tallahassee, FL 32306-1340 bbowden@admin.fsu.edu (850

Sura, Philip

462

S M Stoller Pinellas Environmental Restoration Project - Young- Rainey Star Center  

Office of Legacy Management (LM)

Pinellas Environmental Restoration Project - Young- Rainey Star Center Pinellas Environmental Restoration Project - Young- Rainey Star Center 7030-226 Accutest Job Number: F29125 Sampling Date: 01/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

463

S M Stoller Pinellas Environmental Restoration Project - Young- Rainey Star Center  

Office of Legacy Management (LM)

Pinellas Environmental Restoration Project - Young- Rainey Star Center Pinellas Environmental Restoration Project - Young- Rainey Star Center 110406202 Accutest Job Number: F33039 Sampling Date: 07/06/05 Report to: S M Stoller Cathy.Kelleher@gjo.doe.gov ATTN: Cathy Kelleher Total number of pages in report: Certifications: FL (DOH E83510), NC (573), NJ (FL002), MA (FL946), IA (366), LA (03051), KS (E-10327), SC, AK This report shall not be reproduced, except in its entirety, without the written approval of Accutest Laboratories. Southeast * 4405 Vineland Road * Suite C-15 * Orlando, FL 32811 * tel: 407-425-6700 * fax: 407-425-0707 * http://www.accutest.com Test results contained within this data package meet the requirements of the National Environmental Laboratory Accreditation Conference and/or state specific certification programs as applicable.

464

25th AIAA Applied Aerodynamics Conference June 2528, 2007/Miami, FL  

E-Print Network (OSTI)

25th AIAA Applied Aerodynamics Conference June 25­28, 2007/Miami, FL Validation Study of Aerodynamic Analysis Tools for Design Optimization of Helicopter Rotors Seongim Choi , Juan J. Alonso , Edwin current aerodynamic analysis tools in predicting the unsteady flow field generated by helicopter rotors

Alonso, Juan J.

465

St. Petersburg, FL: Vehicle Use of Recycled Natural Gas Derived from Wastewater Biosolids  

Energy.gov (U.S. Department of Energy (DOE))

Breakout Session 3AConversion Technologies III: Energy from Our WasteWill we Be Rich in Fuel or Knee Deep in Trash by 2025? St. Petersburg, FL: Vehicle Use of Recycled Natural Gas Derived from Wastewater Biosolids William Eleazer, Supervising Engineer, Brown and Caldwell

466

Deciduous Fruit Options for North FL Landscapes by Terry DelValle, Urban Horticulture Extension Agent  

E-Print Network (OSTI)

Deciduous Fruit Options for North FL Landscapes by Terry DelValle, Urban Horticulture Extension your homework first. Site Selection: Here is a list of criteria. Fruit require an open sunny spot/variety will get at matur- ity. Selecting Varieties: Select varieties adapted to our area. Deciduous fruit, also

Watson, Craig A.

467

Machine Learning, ??, 1--6 (1994) fl 1994 Kluwer Academic Publishers, Boston. Manufactured in The Netherlands.  

E-Print Network (OSTI)

Machine Learning, ??, 1--6 (1994) c fl 1994 Kluwer Academic Publishers, Boston. Manufactured in The Netherlands. Book Review: C4.5: Programs for Machine Learning by J. Ross Quinlan. Morgan Kaufmann Publishers are among the most well known and widely used of all machine learning methods. Among decision tree

Salzberg, Steven

468

DOE Zero Energy Ready Home Case Study: Southeast Volusia Habitat for Humanity, Edgewater, FL  

Energy.gov (U.S. Department of Energy (DOE))

Case study of a DOE Zero Energy Ready affordable home in Edgewater, FL, that achieves a HERS score of 49 without PV. The one-story, 1,250-ft2 home has 2x4 walls with fiberglass batt inside plus R-3...

469

DOE Zero Energy Ready Home Case Study, Manatee County Habitat for Humanity, Ellenton, FL, Affordable  

Energy.gov (U.S. Department of Energy (DOE))

Case-study of a DOE Zero Energy Ready Home in Ellenton, FL that scored HERS 53 without PV, HERS 23 with PV. This 1,143 ft2 affordable home has R-23 ICF walls, a spray-foamed sealed attic, solar hot water, and a ducted mini-split heat pump.

470

DOE Zero Energy Ready Home Case Study, e2Homes, Winterpark, FL, Custom Homes  

Energy.gov (U.S. Department of Energy (DOE))

Case study of a DOE Zero Energy Ready Home in Winter Park, FL that scored HERS 57 without PV or HERS -7 with PV. This 4,305 ft2 custom home has autoclaved aerated concrete walls, a sealed attic with R-20 spray foam, and ductless mini-split heat pumps.

471

ARTM E. MASUNOV 12424 Research Parkway, Suite 400, Orlando, FL 32826 USA  

E-Print Network (OSTI)

Professor, NanoScience Technology Center, Department of Chemistry, Department of Physics & Florida Solar Energy Center, University of Central Florida, FL (UCF) 2002-2005: Postdoctoral Research Associate, Russia (with Prof. P. M. Zorkii) #12;Dr. Artëm E. Masunov, UCF NSTC 2 Professional Societies: - American

Kik, Pieter

472

US Recovery Act Smart Grid Projects - Equipment Manufacturing | Open Energy  

Open Energy Info (EERE)

Georgia_System_Operations_Corporation_Inc._Smart_Grid_Project\" Georgia_System_Operations_Corporation_Inc._Smart_Grid_Project\" title=\"Georgia System Operations Corporation Inc. Smart Grid Project\">Georgia System Operations Corporation Inc. Smart Grid Project","title":"Georgia System Operations Corporation Inc. Smart Grid Project","link":null,"lat":33.8545479,"lon":-84.2171424,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Project\" title=\"Whirlpool Corporation Smart Grid Project\">Whirlpool Corporation Smart Grid

473

US Recovery Act Smart Grid Projects - Electric Transmission Systems | Open  

Open Energy Info (EERE)

American_Transmission_Company_LLC_II_Smart_Grid_Project\" American_Transmission_Company_LLC_II_Smart_Grid_Project\" title=\"American Transmission Company LLC II Smart Grid Project\">American Transmission Company LLC II Smart Grid Project","title":"American Transmission Company LLC II Smart Grid Project","link":null,"lat":43.0116784,"lon":-88.2314813,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""},{"text":"Project\" title=\"American Transmission Company LLC Smart Grid Project\">American

474

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by  

E-Print Network (OSTI)

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by 2013 Priority to Benefit Square Feet Feet Project (Proj. Cost/ Recommended reference No Project Title Year 1 Year 2 Year 3 Year 4 Year 5 from Projects (NASF) (GSF) Cost GSF) Date/Rec No. 1 UTILITIES

Slatton, Clint

475

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by  

E-Print Network (OSTI)

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by 2014 Priority to Benefit Square Feet Feet Project (Proj. Cost/ Recommended reference No Project Title Year 1 Year 2 Year 3 Year 4 Year 5 from Projects (NASF) (GSF) Cost GSF) Date/Rec No. 1 UTILITIES

Slatton, Clint

476

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by  

E-Print Network (OSTI)

PECO-ELIGIBLE PROJECT REQUESTS Academic or Net Gross Project Cost Educational Approved by 2015 Priority to Benefit Square Feet Feet Project (Proj. Cost/ Recommended reference No Project Title Year 1 Year 2 Year 3 Year 4 Year 5 from Projects (NASF) (GSF) Cost GSF) Date/Rec No. 1 UTILITIES

Slatton, Clint

477

Canby Cascaded Project Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Canby Cascaded Project Geothermal Project Canby Cascaded Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Canby Cascaded Project Geothermal Project Project Location Information Coordinates 41.443888888889°, -120.87027777778° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.443888888889,"lon":-120.87027777778,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

478

Title VI | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

VI VI Title VI Title VI of the Civil Rights Act of 1964 prohibits discrimination on the basis of race, color, and national origin in programs and activities that receive federal financial assistance. The law states, in part, that: No person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance. The Office of Civil Rights is responsible for monitoring and enforcing compliance with Title VI, investigating Title VI-related complaints, and providing technical assistance to recipients of Department of Energy financial assistance. The Department has promulgated regulations that

479

Session Title Climate Smart Agriculture  

E-Print Network (OSTI)

Session Title Climate Smart Agriculture Session Date Khosla (moderator) Professor, Soil and Crop Sciences College of Agricultural Climate Smart Agriculture is a multi-disciplinary approach to practice agriculture

Barnes, Elizabeth A.

480

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 23, 2013 July 23, 2013 Office of the Under Secretary for Nuclear Security Edward B. Held (Acting) Under Secretary for Nuclear Security DEPARTMENT OF ENERGY Office of the Under Secretary for Management & Performance Vacant Under Secretary Office of the Under Secretary for Science & Energy Vacant Under Secretary for Science Southwestern Power Administration Bonneville Power Administration Western Area Power Administration Southeastern Power Administration U.S. Energy Information Administration Loan Programs Office Advanced Research Projects Agency - Energy General Counsel Assistant Secretary for Congressional & Intergovernmental Affairs Chief Human Capital Officer Chief Financial Officer

Note: This page contains sample records for the topic "fl project title" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

[Presenter's Name] [Presenter's Title]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Byron Woertz Byron Woertz Senior Project Manager Transmission Planning in the West February 8, 2012 Tribal Leader Forum Series, Denver, CO 2 * What is WECC? * What is RTEP? * 2011 10-Year Regional Transmission Plan * 2013 10-Year Regional Transmission Plan * 2013 20-Year Regional Transmission Target Plan * Opportunities for Tribal Participation Today's Discussion 3 "My interest is in the future because I am going to spend the rest of my life there." ...Charles Kettering Why Transmission Planning? 4 What is WECC? 5 * Transmission Expansion Planning Policy Committee (TEPPC)-April, 2006 o Annual study program o Transmission expansion studies

482

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 7, 2013 August 7, 2013 Office of the Under Secretary for Nuclear Security Edward B. Held (Acting) Under Secretary for Nuclear Security DEPARTMENT OF ENERGY Office of the Under Secretary for Management & Performance Vacant Under Secretary Office of the Under Secretary for Science & Energy Vacant Under Secretary for Science Southwestern Power Administration Bonneville Power Administration Western Area Power Administration Southeastern Power Administration U.S. Energy Information Administration Loan Programs Office Advanced Research Projects Agency - Energy General Counsel Assistant Secretary for Congressional & Intergovernmental Affairs Chief Human Capital Officer Chief Financial Officer

483

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Roy Long, Technology Manager, NETL Roy Long, Technology Manager, NETL UDAC Meeting, February 23, 2011, Washington, D.C. Oil and Gas Program Overview February 23, 2011 2 Outline Introduction Traditional O&G Program Overview  O&G Projects Summary  Stripper Well Consortium Highlight Integrated Technology Transfer Program  Structure  Publications  Knowledge Management Database (KMD) 3 NETL Applies Basic Science to Technology Development, Demonstration, & Deployment Onsite Research & Development Systems, Analyses, & Planning Extramural Research & Collaboration Developing the critical science and technology to discover and Commercialize advanced energy systems that efficiently utilize domestic Resources in an environmentally sustainable manner 4 NETL Natural Gas & Oil R&D Program

484

Project Charter Current 8/23/2006  

E-Print Network (OSTI)

Project Charter Current 8/23/2006 Version 2 #12;Page 1 10/12/2006 Document Control Document Title: Project Charter Author(s): CMS Project Team Date By Action Version Pages 8/23/06 SKC Template applied 1.................................................................................................................................. 3 The Central Vision for the Project

de Lijser, Peter

485

Title I conceptual design for Pit 6 landfill closure at Lawrence Livermore National Laboratory Site 300  

SciTech Connect

The objective of this design project is to evaluate and prepare design and construction documents for a closure cover cap for the Pit 6 Landfill located at Lawrence Livermore National Laboratory Site 300. This submittal constitutes the Title I Design (Conceptual Design) for the closure cover of the Pit 6 Landfill. A Title I Design is generally 30 percent of the design effort. Title H Design takes the design to 100 percent complete. Comments and edits to this Title I Design will be addressed in the Title II design submittal. Contents of this report are as follows: project background; design issues and engineering approach; design drawings; calculation packages; construction specifications outline; and construction quality assurance plan outline.

MacDonnell, B.A.; Obenauf, K.S. [Golder Associates, Inc., Alameda, CA (United States)

1996-08-01T23:59:59.000Z

486

Webinar: Wind-to-Hydrogen Cost Modeling and Project Findings  

Energy.gov (U.S. Department of Energy (DOE))

Video recording and text version of the webinar titled, Wind-to-Hydrogen Cost Modeling and Project Findings, originally presented on January 17, 2013.

487

Clarence Strait Tidal Energy Project, Tenax Energy Tropical Tidal...  

Open Energy Info (EERE)

Energy Tropical Tidal Test Centre, Jump to: navigation, search 1 Retrieved from "http:en.openei.orgwindex.php?titleClarenceStraitTidalEnergyProject,TenaxEnergyTropica...

488

SciTech Connect: Transportation Energy Futures Series: Projected...  

Office of Scientific and Technical Information (OSTI)

Transportation Energy Futures Series: Projected Biomass Utilization for Fuels and Power in a Mature Market Citation Details In-Document Search Title: Transportation Energy Futures...

489

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

999 Federal Advisory Committee 999 Federal Advisory Committee Overview of DOE Oil & Gas Program September 9-12, 2008 Guide DeHoratiis Acting Deputy Assistant Secretary Office of Oil and Natural Gas Designated Federal Officer Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Oil and Gas R&D Funding Consortium Program * Ultra-Deepwater $14.963 * Unconventional Gas $13.854 * Small Producer $3.206 * RPSEA administration $3.562 * NETL Oversight $1.875 Complementary Program * Extreme Drilling * Unconventional Oil and EOR * Environmental * Resource Assessment Traditional Program * E&P * Hydrate * Environmental * LNG * RMOTC * Congressional Projects: - Alaska - SWC/GOMH NETL Department of Energy Office of Fossil Energy $37.5 MM $12.5 MM FY09 H: $29.2 MM S: $32.2 MM Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources

490

No Slide Title  

Gasoline and Diesel Fuel Update (EIA)

and Summer Fuels Outlook Guy Caruso Administrator, Energy Information Administration 2006 Summer Transportation Fuels Outlook Conference April 11, 2006 Washington, DC Several Key Factors Drive the Short-Term Fuels Forecast 1) Rising world oil consumption; 2) Low global surplus production capacity and tight crude oil supply relative to demand; 3) Supply concerns in international oil markets (such as in Nigeria, Iraq, and Iran); 4) The challenges of:  Stricter sulfur standards under the Tier 2 Gasoline program;  MTBE phase-out;  A shift to ultra low sulfur diesel. All these factors contribute to higher prices for petroleum products, particularly in the coming months. World Oil Consumption Growth Slowed in 2005; Projected to Increase in 2006-2007 Source: EIA, Short-Term Energy Outlook, April 2006

491

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

from DOE's from DOE's Mercury Control Technology Field Testing and Related Projects China Workshop on Mercury Control from Coal Combustion October 31 - November 2, 2005 Beijing, China Thomas J. Feeley, III thomas.feeley@netl.doe.gov National Energy Technology Laboratory China Hg Workshop_Beijing_Nov 3 , 2005 Outline * DOE/NETL's Hg control technology program * Characterization of fly ash * Characterization of FGD solids * Summary/conclusion DOE-NETL CUB Program Goal: 50% Utilization by 2010 0 20 40 60 80 100 120 140 160 1980 1990 2000 2010 Million tons / year Production Production Utilization Utilization Disposal Utilization Production estimate based on implementation of CAIR Phase I Production estimate based on implementation of CAIR Phase I China Hg Workshop_Beijing_Nov 3 , 2005 EPA Regulations Introduce Additional

492

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

10 10 These slides are updated on a monthly basis, as soon as data are reasonably final for the preceding month. Hours worked are estimated monthly and updated with final and actual values quarterly. While every effort is made to present accurate and final data, data may change in subsequent months, as additional information becomes available and as later developments change the recordability of some cases. Refer questions about these charts to rwfisher@lbl.gov 2 Narrative of October 2010 Injury/Illness Cases * Guest Student Assistant - Finger contusion - While plumbing additional signal cables in a NIM bin rack the left middle finger struck the blade of one of the cooling fans. * Materials Project Scientist/Engineer - Allergic response - Employee experienced a sudden onset of allergy

493

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MA-1 MA-1 Office of Scheduling MA-10 February 3, 2011 Ingrid Kolb, Director Laurie Morman, Chief of Staff MA-40 MA-30 MA-90 Office of Aviation Management Office of Administration Office of Engineering & Construction Management MA-50 Office of Procurement & Assistance Management MA-60 Office of Executive Secretariat MA-70 Office of Information Resources Anthony Rediger,Director Glen Wattman, Director Brian Costlow, Director Paul Bosco, Director Vacant, Director Kevin Hagerty, Director Office of Headquarters Safety, Health and Security MA-41 MA-43 MA-42 Office of Administrative Management and Support Office of Logistics and Facility Operations Deputy Director for Facilities Management Deputy Director for Project Management Rebecca Montoya, Dep. Director Office of Procurement

494

No Slide Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MA-1 MA-1 Office of Scheduling MA-10 February 3, 2011 Ingrid Kolb, Director Laurie Morman, Chief of Staff MA-40 MA-30 MA-90 Office of Aviation Management Office of Administration Office of Engineering & Construction Management MA-50 Office of Procurement & Assistance Management MA-60 Office of Executive Secretariat MA-70 Office of Information Resources Anthony Rediger,Director Glen Wattman, Director Brian Costlow, Director Paul Bosco, Director Vacant, Director Kevin Hagerty, Director Office of Headquarters Safety, Health and Security MA-41 MA-43 MA-42 Office of Administrative Management and Support Office of Logistics and Facility Operations Deputy Director for Facilities Management Deputy Director for Project Management Rebecca Montoya, Dep. Director Office of Procurement

495

No Slide Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 These slides are updated on a monthly basis as soon as data are reasonably final for the preceding month. Hours worked are estimated monthly and updated with final and actual values quarterly. Every effort is made to present accurate and final data. However, changes may occur in subsequent months as additional information becomes available and as developments change the recordability of some cases. Refer questions about these charts to rwfisher@lbl.gov 2 Injury/Illness Cases - Slip / Trip / Fall June 2011 * Administrator - Fractured wrist - The employee fell to the parking lot surface while walking. * Project Manager - Contusion of wrist and hand - The employee tripped while ascending exterior wooden staircase (handrail was not used). * Custodian - Ankle sprain

496

Annual Poster Session 2009 Titles and Presenters  

E-Print Network (OSTI)

Kolli Title: Genetic Variation in the Lecane luna from Populations in the Chihuahua desert. 9) Daniel

Fuentes, Olac

497

Implementation of Title V in California  

SciTech Connect

This presentation provides information on California`s Title V operating permit programs for stationary sources mandated by the 1990 Clean Air Act amendments. It covers background, applicability, regulatory history, requirements, and issues. In addition, specific information is provided on the progress of Title V implementation in California, including: the roles of implementing agencies, the status of district Title V programs, number and distribution of Title V sources, cost of Title V implementation, and highlights of Title V implementation in the State. The question and answer format is intended to facilitate easy access to specific information related to the Title V operating permit programs in California.

Werner, B.; Cook, B.

1996-12-31T23:59:59.000Z

498

No Slide Title  

Gasoline and Diesel Fuel Update (EIA)

Fuels Outlook Fuels Outlook Guy Caruso Administrator Energy Information Administration EIA 2008 Energy Conference 30 Years of Energy Information and Analysis April 8, 2008 Washington, DC EIA, Short-Term Energy Outlook, April 2008 1) Rising world oil consumption 2) Low global surplus oil production capacity 3) Insufficient non-OPEC oil supply growth relative to demand 4) Supply concerns in international oil markets Together these factors contribute to high prices for petroleum products. Key Factors Driving the Short-Term Forecast EIA, Short-Term Energy Outlook, April 2008 45 50 55 60 65 70 75 80 85 90 95 2001 2002 2003 2004 2005 2006 2007 2008 Million barrels per day -0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 Change from prior year (million barrels per day) China US Other Total Consumption Annual Growth Forecast World Oil Consumption Is Projected to

499

No Slide Title  

Gasoline and Diesel Fuel Update (EIA)

Summer Transportation Summer Transportation Fuels Outlook U.S. Energy Information Administration April 6, 2010 Source: Short-Term Energy Outlook, April 2010 1) Stronger economic recovery in emerging economies 2) High inventories 3) Slowing growth in non-OPEC production 4) Higher OPEC surplus crude oil production capacity Together these factors contribute to relatively stable but rising prices for crude oil and petroleum products. Key factors driving the Short-Term Outlook Source: Short-Term Energy Outlook, April 2010 30 35 40 45 50 55 60 65 70 75 80 85 90 95 2003 2004 2005 2006 2007 2008 2009 2010 -2.5 -1.5 -0.5 0.5 1.5 2.5 3.5 4.5 5.5 China United States Other Total consumption Annual growth Forecast World liquid fuels consumption is projected to increase by 1.5 million bbl/d in 2010 million barrels per day million barrels per day

500

Category:Smart Grid Projects - Advanced Metering Infrastructure | Open  

Open Energy Info (EERE)

Metering Infrastructure Metering Infrastructure Jump to: navigation, search Smart Grid Projects - Advanced Metering Infrastructure category Pages in category "Smart Grid Projects - Advanced Metering Infrastructure" The following 31 pages are in this category, out of 31 total. A ALLETE Inc., d/b/a Minnesota Power Smart Grid Project B Baltimore Gas and Electric Company Smart Grid Project Black Hills Power, Inc. Smart Grid Project Black Hills/Colorado Electric Utility Co. Smart Grid Project C CenterPoint Energy Smart Grid Project Central Maine Power Company Smart Grid Project Cheyenne Light, Fuel and Power Company Smart Grid Project City of Fulton, Missouri Smart Grid Project City of Glendale Water and Power Smart Grid Project City of Quincy, FL Smart Grid Project City of Westerville, OH Smart Grid Project