Powered by Deep Web Technologies
Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Five year research plan, 1988--1992: Energy from the earth: Geothermal energy program  

SciTech Connect (OSTI)

Consistent with national energy policy guidance, the plan concentrates on research and development (R and D) and limits system experiments to only those necessary to stimulate industrial confidence in the validity of research findings. A key strategy element is the continuation of the government/industry partnership which is critical to successful development of geothermal technology. The primary near-term research emphasis is the extension of hydrothermal technology options for reservoir identification, reservoir analysis, hard rock penetration, and flash and binary electric plants. The advanced geothermal resources--geopressured, hot dry rock, and magma--are longer-term and higher-risk focal points, and research in these areas centers on establishing a technology base that will allow industry to make prudent and timely investment decisions with respect to the use of these resources. 13 figs.

Not Available

1988-10-01T23:59:59.000Z

2

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

SciTech Connect (OSTI)

China's 11th Five-Year Plan (FYP) sets an ambitious target to reduce the energy intensity per unit of gross domestic product (GDP) by 20% from 2005 to 2010 (NDRC, 2006). In the building sector, the primary energy-saving target allocated during the 11 FYP period is 100 Mtce. Savings are expected to be achieved through the strengthening of enforcement of building energy efficiency codes, existing building retrofits and heat supply system reform, followed by energy management of government office buildings and large scale public buildings, adoption of renewable energy sources. To date, China has reported that it achieved the half of the 20% intensity reduction target by the end of 2008, however, little has been made clear on the status and the impact of the building programs. There has also been lack of description on methodology for calculating the savings and baseline definition, and no total savings that have been officially reported to date. This paper intend to provide both quantitative and qualitative assessment of the key policies and programs in building sector that China has instituted in its quest to fulfill the national goal. Overall, this paper concludes that the largest improvement for building energy efficiency were achieved in new buildings; the program to improve the energy management in government and large scale public buildings are in line with the target; however the progress in the area of existing building retrofit particularly heat supply system reform lags the stated goal by a large amount.

Zhou, Nan; McNeil, Michael; Levine, Mark

2010-06-07T23:59:59.000Z

3

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

SciTech Connect (OSTI)

China's 11th Five-Year Plan (FYP) sets an ambitious target to reduce the energy intensity per unit of gross domestic product (GDP) by 20% from 2005 to 2010 (NDRC, 2006). In the building sector, the primary energy-saving target allocated during the 11 FYP period is 100 Mtce. Savings are expected to be achieved through the strengthening of enforcement of building energy efficiency codes, existing building retrofits and heat supply system reform, followed by energy management of government office buildings and large scale public buildings, adoption of renewable energy sources. To date, China has reported that it achieved the half of the 20% intensity reduction target by the end of 2008, however, little has been made clear on the status and the impact of the building programs. There has also been lack of description on methodology for calculating the savings and baseline definition, and no total savings that have been officially reported to date. This paper intends to provide both quantitative and qualitative assessment of the key policies and programs in building sector that China has instituted in its quest to fulfill the national goal. Overall, this paper concludes that the largest improvement for building energy efficiency were achieved in new buildings; the program to improve the energy management in government and large scale public buildings are in line with the target; however the progress in the area of existing building retrofits, particularly heating supply system reform lags behind the stated goal by a large amount.

Zhou, Nan; Mcneil, Michael; Levine, Mark

2011-03-01T23:59:59.000Z

4

Industrial sector energy conservation programs in the People`s Republic of China during the seventh five-year plan (1986--1990)  

SciTech Connect (OSTI)

The impetus at the national level to invest in energy conservation is quite strong and has long been reflected not only in official pronouncements, but also in the investments and organizational activities of the Chinese government. In the early 1980s the central government began a program of direct investments in industrial energy conservation that continues to the present. In addition, concurrently established governmental and quasi-governmental agencies have pursued conservation through administrative and educational measures. In Section 2 of this paper the authors outline the policies and institutions that supported China`s program of energy conservation investments in the Sixth and Seventh Five-Year Plans (FYPs) (1981--1985 and 1986--1990). In Section 3 they describe examples of the types of conservation projects pursued in four industrial subsectors: ferrous metals manufacturing; non-ferrous metals mining and manufacturing; chemicals manufacturing; and building materials manufacturing. Section 4 presents a simple methodology for comparing the costs of energy conservation to those of energy supply. Further discussion points out the applicability and limitations of this methodology to State Planning Commission published statistical material on the overall results of energy conservation investments. Though problematic, such analysis indicates that energy conservation investments were probably substantially cheaper than investments in equivalent energy supply would have been. They end with a discussion of some of the difficulties encountered in carrying out the conservation investment programs.

Liu Zhiping [State Planning Commission, Beijing (China). Energy Research Inst.; Sinton, J.E.; Yang Fuqiang; Levine, M.D.; Ting, M.K. [Lawrence Berkeley Lab., CA (United States)

1994-09-01T23:59:59.000Z

5

Twenty-Five Year Site Plan FY2013 - FY2037  

SciTech Connect (OSTI)

Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.

Jones, William H. [Los Alamos National Laboratory

2012-07-12T23:59:59.000Z

6

Five-Year Master Plan University of Michigan-Ann Arbor  

E-Print Network [OSTI]

Five-Year Master Plan University of Michigan-Ann Arbor Prepared by: University of Michigan UNIVERSITY OF MICHIGAN-ANN ARBOR FY2015 TABLE OF CONTENTS I. Mission Statement II. Instructional Programming The mission of the University of Michigan is to serve the people of Michigan and the world through preeminence

Kamat, Vineet R.

7

Five-Year Master Plan University of Michigan-Ann Arbor  

E-Print Network [OSTI]

Five-Year Master Plan University of Michigan-Ann Arbor Prepared by: University of Michigan UNIVERSITY OF MICHIGAN-ANN ARBOR TABLE OF CONTENTS I. Mission Statement II. Instructional Programming III The mission of the University of Michigan is to serve the people of Michigan and the world through preeminence

Kamat, Vineet R.

8

Five Year Plan September 1, 2007 August 31, 2012  

E-Print Network [OSTI]

reputation in the global oil and gas community for turning out quality graduates and technical information for Petroleum Research with the support of 14 oil and gas member companies; · We have added 10 new faculty for our graduates. #12;4 Five-Year Forecasts The following three tables present the forecasts for the next

9

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

Plans Organization and Implementation of Energy ConservationIndustrial Energy Conservation Investment Funding 3.Case Studies of Energy Conservation Investments by Industry

Zhiping, L.

2010-01-01T23:59:59.000Z

10

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

projects, and rural energy demonstration projects. AsSociety, and the China Rural Energy Society. Newspapers and1. We do not evaluate rural energy conservation programs in

Zhiping, L.

2010-01-01T23:59:59.000Z

11

Being Relevant in Tough Times: TRIUMF's Five-Year Plan  

ScienceCinema (OSTI)

Perhaps better known to the international community than its own neighbors, TRIUMF is Canada's national laboratory for particle and nuclear physics.  Working with the Canadian scientific community, TRIUMF has formulated a new vision to transform the laboratory and deliver a whole new level of performance and impact.  The plan capitalizes on platform technologies (superconducting RF cavities for accelerator physics and radiotracers in nuclear medicine) and exploits Canada's role in ATLAS and the LHC.  I will describe the key elements of the plan and discuss the science-policy landscape in which TRIUMF must make its case.

Tim Meyer

2010-01-08T23:59:59.000Z

12

Five-Year Master Plan University of Michigan-Ann Arbor  

E-Print Network [OSTI]

Five-Year Master Plan University of Michigan-Ann Arbor Prepared by: University of Michigan-Ann Arbor Facilities and Operations October 31, 2014 #12;FIVE-YEAR MASTER PLAN UNIVERSITY OF MICHIGAN of Contents 1 #12;Section I Mission Statement #12;MISSION STATEMENT The mission of the University of Michigan

Kamat, Vineet R.

13

FY 2013 Major Capital Outlay Project Request and Five-Year Comprehensive Master Plan  

E-Print Network [OSTI]

in the following specific areas: Transmission & Distribution (smart grids technology, cyber-security) GenerationFY 2013 Major Capital Outlay Project Request and Five-Year Comprehensive Master Plan September 2011 ____ No _X__ Is There a Five-Year Capital Outlay Plan Available? Yes _X__ No ____ Are Professionally

14

List of Acronyms Acronyms in CIOSS Five-Year Plan  

E-Print Network [OSTI]

Information Systems GLOBEC Global Ocean Ecosystems Dynamics program GODAE Global Ocean Data Assimilation Satellite Studies COAS College of Oceanic and Atmospheric Sciences COAST Coastal Ocean Applications and Science Team CoOP Coastal Ocean Processes CoOP COASTCoastal Ocean Processes ­ Coastal Ocean Advances

Kurapov, Alexander

15

Energy Management: A Corporate Objective in the Five-Year Business Plan  

E-Print Network [OSTI]

This paper presents the Energy Management Program developed by the Western Electric Company. The program includes managerial accountabilities; administrative and technical activities; and a most recently implemented comprehensive five-year energy...

Mulhern, T. A.

1982-01-01T23:59:59.000Z

16

FIVE-YEAR REVIEW OF UNDERGRADUATE AND GRADUATE DEGREE PROGRAMS  

E-Print Network [OSTI]

: HISTORY, 2000-2005 October 2007 Table of Contents Section I. Executive Summary....................................................... ...2 Section II. Program Review Narrative ........................................... ...4 Question One ................................................................. 23 Question Nine................................................................... 32 Question Ten

Gering, Jon C.

17

U.S. Department of Energy clean cities five-year strategic plan.  

SciTech Connect (OSTI)

Clean Cities is a government-industry partnership sponsored by the U.S. Department of Energy's (DOE) Vehicle Technologies Program, which is part of the Office of Energy Efficiency and Renewable Energy. Working with its network of about 100 local coalitions and more than 6,500 stakeholders across the country, Clean Cities delivers on its mission to reduce petroleum consumption in on-road transportation. In its work to reduce petroleum use, Clean Cities focuses on a portfolio of technologies that includes electric drive, propane, natural gas, renewable natural gas/biomethane, ethanol/E85, biodiesel/B20 and higher-level blends, fuel economy, and idle reduction. Over the past 17 years, Clean Cities coalitions have displaced more than 2.4 billion gallons of petroleum; they are on track to displace 2.5 billion gallons of gasoline per year by 2020. This Clean Cities Strategic Plan lays out an aggressive five-year agenda to help DOE Clean Cities and its network of coalitions and stakeholders accelerate the deployment of alternative fuel and advanced technology vehicles, while also expanding the supporting infrastructure to reduce petroleum use. Today, Clean Cities has a far larger opportunity to make an impact than at any time in its history because of its unprecedented $300 million allocation for community-based deployment projects from the American Recovery and Reinvestment Act (ARRA) (see box below). Moreover, the Clean Cities annual budget has risen to $25 million for FY2010 and $35 million has been requested for FY2011. Designed as a living document, this strategic plan is grounded in the understanding that priorities will change annually as evolving technical, political, economic, business, and social considerations are woven into project decisions and funding allocations. The plan does not intend to lock Clean Cities into pathways that cannot change. Instead, with technology deployment at its core, the plan serves as a guide for decision-making at both the national and local levels of Clean Cities over the next five years. The plan recognizes the need for flexibility and sets out a strategic direction that will build on the progress of current technologies and new opportunities presented in emerging fuels and technologies, such as hydrogen and fuel cells, as well as new niche markets such as off-road applications that build additional throughput at existing alternative fuel stations.

Cambridge Concord Associates

2011-02-15T23:59:59.000Z

18

The Five-Year Effectiveness of the Texas First Dental Home Program  

E-Print Network [OSTI]

This study examined the Texas Medicaid First Dental Home (FDH) program in rural and urban private pediatric dental practice settings and evaluated its five-year impact on caries severity, age of onset of decay, and treatment location. Comparisons...

McFarland, Taylor BH

2014-08-06T23:59:59.000Z

19

Chief Financial Officer FY 1997 status report and five-year plan  

SciTech Connect (OSTI)

The Chief Financial Officers Act of 1990 (CFO Act) establishes the legal framework for improved Federal financial management. The Act requires the agency CFO to prepare, and annually revise, a plan to implement the Office of Management and Budget (OMB) Federal Financial Management Status Report and Five-Year Plan. This is the sixth Status Report and Five-Year Plan submission to OMB by the Department of Energy (DOE). Financial management at the Department operates in an environment of Government-wide efforts to improve financial management and implements legislation and administrative provisions which stress the need for change. This report sets forth the Department`s plans for financial management improvements in the coming years. It also highlights several new initiatives completed or currently underway that will significantly improve the overall effectiveness of financial management at the Department of Energy.

NONE

1997-10-01T23:59:59.000Z

20

EM Five-Year Plan (FY 2008 - FY 2012) | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTanklessDOJ TitleDr. Steven Chu AboutAbout Us » EM Five-Year Plan

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan  

SciTech Connect (OSTI)

Experience with China's 20% energy intensity improvement target during the 11th Five-Year Plan (FYP) (2006-2010) has shown the challenges of rapidly setting targets and implementing measures to meet them. For the 12th FYP (2011-2015), there is an urgent need for a more scientific methodology to allocate targets among the provinces and to track physical and economic indicators of energy and carbon saving progress. This report provides a sectoral methodology for allocating a national energy intensity target - expressed as percent change in energy per unit gross domestic product (GDP) - among China's provinces in the 12th FYP. Drawing on international experience - especially the European Union (EU) Triptych approach for allocating Kyoto carbon targets among EU member states - the methodology here makes important modifications to the EU approach to address an energy intensity rather than a CO{sub 2} emissions target, and for the wider variation in provincial energy and economic structure in China. The methodology combines top-down national target projections and bottom-up provincial and sectoral projections of energy and GDP to determine target allocation of energy intensity targets. Total primary energy consumption is separated into three end-use sectors - industrial, residential, and other energy. Sectoral indicators are used to differentiate the potential for energy saving among the provinces. This sectoral methodology is utilized to allocate provincial-level targets for a national target of 20% energy intensity improvement during the 12th FYP; the official target is determined by the National Development and Reform Commission. Energy and GDP projections used in the allocations were compared with other models, and several allocation scenarios were run to test sensitivity. The resulting allocations for the 12th FYP offer insight on past performance and offer somewhat different distributions of provincial targets compared to the 11th FYP. Recommendations for reporting and monitoring progress on the targets, and methodology improvements, are included.

Ohshita, Stephanie; Price, Lynn

2011-03-21T23:59:59.000Z

22

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

SciTech Connect (OSTI)

During the period 1980 to 2002, China experienced a 5% average annual reduction in energy consumption per unit of gross domestic product (GDP). The period 2002-2005 saw a dramatic reversal of the historic relationship between energy use and GDP growth: energy use per unit of GDP increased an average of 3.8% per year during this period (NBS, various years). China's 11th Five Year Plan (FYP), which covers the period 2006-2010, required all government divisions at different levels to reduce energy intensity by 20% in five years in order to regain the relationship between energy and GDP growth experienced during the 1980s and 1990s. This report provides an assessment of selected policies and programs that China has instituted in its quest to fulfill the national goal of a 20% reduction in energy intensity by 2010. The report finds that China has made substantial progress toward its goal of achieving 20% energy intensity reduction from 2006 to 2010 and that many of the energy-efficiency programs implemented during the 11th FYP in support of China's 20% energy/GDP reduction goal appear to be on track to meet - or in some cases even exceed - their energy-saving targets. It appears that most of the Ten Key Projects, the Top-1000 Program, and the Small Plant Closure Program are on track to meet or surpass the 11th FYP savings goals. China's appliance standards and labeling program, which was established prior to the 11th FYP, has become very robust during the 11th FYP period. China has greatly enhanced its enforcement of new building energy standards but energy-efficiency programs for buildings retrofits, as well as the goal of adjusting China's economic structure to reduce the share of energy consumed by industry, do not appear to be on track to meet the stated goals. With the implementation of the 11th FYP now bearing fruit, it is important to maintain and strengthen the existing energy-saving policies and programs that are successful while revising programs or adding new policy mechanisms to improve the programs that are not on track to achieve the stated goals.

Levine, Mark D.; Price, Lynn; Zhou, Nan; Fridley, David; Aden, Nathaniel; Lu, Hongyou; McNeil, Michael; Zheng, Nina; Yining, Qin; Yowargana, Ping

2010-04-28T23:59:59.000Z

23

Research Councils UK The Government of India's 12th five-year plan (2012-2017) focuses  

E-Print Network [OSTI]

in India to align existing priorities and to scope areas of mutual research and policy interest. In doingResearch Councils UK engaging with India #12;The Government of India's 12th five-year plan (2012 in the global R&D rankings, India is clearly a partner of choice for the UK and the UK Research Councils. We

Berzins, M.

24

Museum Associates Program For nearly twenty five years, the Williams College Museum of Art's volunteer Museum Associates  

E-Print Network [OSTI]

Museum Associates Program For nearly twenty five years, the Williams College Museum of Art's volunteer Museum Associates program has provided opportunities for Williams College students to broaden their knowledge of art and art history, learn about museum education, and develop valuable public speaking

Aalberts, Daniel P.

25

Five Year Plan  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember U.S.Financial Statement:Fire2 ASCEM4Five FactsFive

26

Brookhaven Five Year Plan  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3--Logistical5/08 AttendanceofImperialBoulder CountyBriefing

27

Taking out one billion tones of carbon: the magic of China's 11thFive-Year Plan  

SciTech Connect (OSTI)

China's 11th Five-Year Plan (FYP) sets an ambitious targetfor energy-efficiency improvement: energy intensity of the country sgross domestic product (GDP) should be reduced by 20 percent from 2005 to2010 (NDRC, 2006). This is the first time that a quantitative and bindingtarget has been set for energy efficiency, and signals a major shift inChina's strategic thinking about its long-term economic and energydevelopment. The 20 percent energy intensity target also translates intoan annual reduction of over one billion tons of CO2 by 2010, making theChinese effort one of most significant carbon mitigation effort in theworld today. While it is still too early to tell whether China willachieve this target, this paper attempts to understand the trend inenergy intensity in China and to explore a variety of options towardmeeting the 20 percent target using a detailed endues energymodel.

Lin, Jiang; Zhou, Nan; Levine, Mark D.; Fridley, David

2007-05-01T23:59:59.000Z

28

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

SciTech Connect (OSTI)

China's 11th Five-Year Plan (FYP) sets an ambitious target for energy-efficiency improvement: energy intensity of the country's gross domestic product (GDP) should be reduced by 20% from 2005 to 2010 (NDRC, 2006). This is the first time that a quantitative and binding target has been set for energy efficiency, and signals a major shift in China's strategic thinking about its long-term economic and energy development. The 20% energy intensity target also translates into an annual reduction of over 1.5 billion tons of CO2 by 2010, making the Chinese effort one of most significant carbon mitigation effort in the world today. While it is still too early to tell whether China will achieve this target, this paper attempts to understand the trend in energy intensity in China and to explore a variety of options toward meeting the 20% target using a detailed end-use energy model.

Zhou, Nan; Lin, Jiang; Zhou, Nan; Levine, Mark; Fridley, David

2007-07-01T23:59:59.000Z

29

Inspection of Nickel Alloy Welds: Results from Five Year International Program  

SciTech Connect (OSTI)

The U.S. Nuclear Regulatory Commission established and coordinated the international Program for the Inspection of Nickel alloy Components (PINC). The goal of PINC was to evaluate the capabilities of various nondestructive examination (NDE) techniques to detect and characterize primary water stress corrosion cracking (PWSCC) in dissimilar metal welds. Round-robin results showed that a combination of conventional and phased-array ultrasound provide the highest performance for flaw detection and depth sizing in dissimilar metal piping welds. The effective detection of flaws in bottom-mounted instrumentation penetrations by eddy current and ultrasound shows that it may be possible to reliably inspect these components in the field.

Prokofiev, Iouri; Cumblidge, Stephen E.; Doctor, Steven R.

2011-06-23T23:59:59.000Z

30

Five-Year Implementation Plan For Advanced Separations and Waste Forms Capabilities at the Idaho National Laboratory (FY 2011 to FY 2015)  

SciTech Connect (OSTI)

DOE-NE separations research is focused today on developing a science-based understanding that builds on historical research and focuses on combining a fundamental understanding of separations and waste forms processes with small-scale experimentation coupled with modeling and simulation. The result of this approach is the development of a predictive capability that supports evaluation of separations and waste forms technologies. The specific suite of technologies explored will depend on and must be integrated with the fuel development effort, as well as an understanding of potential waste form requirements. This five-year implementation plan lays out the specific near-term tactical investments in people, equipment and facilities, and customer capture efforts that will be required over the next five years to quickly and safely bring on line the capabilities needed to support the science-based goals and objectives of INL’s Advanced Separations and Waste Forms RD&D Capabilities Strategic Plan.

Not Listed

2011-03-01T23:59:59.000Z

31

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

within the Energy Efficiency Best Practices Program (Shock,international best practice in terms of energy efficiencyenergy efficiency labeling, a leading example of best practice

Levine, Mark D.

2010-01-01T23:59:59.000Z

32

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...  

Broader source: Energy.gov (indexed) [DOE]

the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development activities for the electric transmission and...

33

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResourcesFLASH2011-11-OPAMFY 2007 TotalFinalJobs FindofMathematicianDepartment

34

A longitudinal trend study of a university-based teacher induction program: observable behaviors of urban teachers and their perceptions of program components five years after participation  

E-Print Network [OSTI]

participants of a one-semester or a two-semester teacher induction program responding to the Teacher Induction Program Participant Survey (TIPPS) recognized formative observation as the most effective component. Peer support and professional development were...

Moon Merchant, Vickie V

2006-10-30T23:59:59.000Z

35

Program Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada wins GeraldDuncan McBranchProgram Planning at

36

US Geothermal Energy Program Multiyear Plan, 1988-1992  

SciTech Connect (OSTI)

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. This is a final report. It contains significant data on cost of power from geothermal power systems, and is of historical (history) interest in that regard. (DJE 2005)

None

1988-10-01T23:59:59.000Z

37

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

of the inspection or energy audit are borne by the centralstatistics, performing energy audits, and certifying theMOHURD also carried out an energy audit of 768 buildings and

Zhou, Nan

2011-01-01T23:59:59.000Z

38

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

of the inspection or energy audit are borne by the centralstatistics, performing energy audits, and certifying theMOHURD also carried out an energy audit of 768 buildings and

Zhou, Nan

2010-01-01T23:59:59.000Z

39

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

and/or require energy efficiency in buildings during the 11to strengthen energy efficiency in buildings. This BuildingUniversity Building Energy Efficiency Research Centre (

Zhou, Nan

2010-01-01T23:59:59.000Z

40

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

and/or require energy efficiency in buildings during the 11to strengthen energy efficiency in buildings. This BuildingHao Bin. 2009. “Building Energy Efficiency Evaluation and

Zhou, Nan

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

incentives to include energy-efficient design and materials,ensure that efficient designs lead to real energy savings in

Zhou, Nan

2010-01-01T23:59:59.000Z

42

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

incentives to include energy-efficient design and materials,ensure that efficient designs lead to real energy savings in

Zhou, Nan

2011-01-01T23:59:59.000Z

43

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

building retrofits and heat supply system reform, followedof carrying out the heat supply system reform task. Buildingbuilding retrofits and heat supply system reform, followed

Zhou, Nan

2011-01-01T23:59:59.000Z

44

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

building retrofits and heat supply system reform, followedretrofit particularly heat supply system reform lags theof carrying out the heat supply system reform task. Building

Zhou, Nan

2010-01-01T23:59:59.000Z

45

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

retrofit in northern area district heating Special fund forbuildings that have district heating system (Wu, 2009). The

Zhou, Nan

2011-01-01T23:59:59.000Z

46

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

retrofit in northern area district heating Special fund forbuildings that have district heating system (Wu, 2009). The

Zhou, Nan

2010-01-01T23:59:59.000Z

47

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

Building energy codes do not apply in rural areas, whichfor rural buildings. The “No Building Codes” scenario energyEnergy Policy 37 (6): 2066- Ministry of Construction (MOC)/Ministry of Housing and Urban-Rural

Zhou, Nan

2010-01-01T23:59:59.000Z

48

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network [OSTI]

is assumed for rural buildings; therefore energy consumptionBuilding energy codes do not apply in rural areas, whichEnergy efficiency policies need to be implemented in medium-small and small cities and in rural

Zhou, Nan

2011-01-01T23:59:59.000Z

49

Five year rollover hedges for agricultural lenders  

E-Print Network [OSTI]

FIVE YEAR ROLLOVER HEDGES FOR AGRICULTURAL LEADERS A Professional Paper by John Christopher Floyd. Jr. Submitted to the College of Agriculture of Texas ARM University In Partial Fulfillment of the Requirements for the Degree of Master... of Agriculture May, 19BB Advisor Or. David J. Leatham Major Subject: Agricultural Economics FIVE YEAR ROLLOVER HEDGE FOR AGRICULTURAL LEMDERS A Professional Paper by John Christopher Floyd, Jr. Approved as to style and content by: an. Advis ry C...

Floyd, John Christopher

1988-01-01T23:59:59.000Z

50

CIOSS Five Year Review 5. Technology Transfer  

E-Print Network [OSTI]

SST fields will be documented in a peer-reviewed paper, as will the wind climatologies of CheltonCIOSS Five Year Review 5. Technology Transfer 10-11-06 A. How are research results from and the nature of the collaboration. As an example, the collaboration between Richard Reynolds and Dudley Chelton

Kurapov, Alexander

51

Geothermal Energy Multi-Year Program Plan, FY 1993-1997  

SciTech Connect (OSTI)

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form. (DJE 2005)

None

1992-03-01T23:59:59.000Z

52

Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000  

SciTech Connect (OSTI)

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

None

1995-03-03T23:59:59.000Z

53

Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs  

SciTech Connect (OSTI)

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

54

TECHNOLOGY PROGRAM PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United...

55

Proposed New Program: Planning New Programs  

E-Print Network [OSTI]

Proposed New Program: Planning New Programs Planning Program As outlined in the attached document, the Human Geography group is bringing forward a proposal for a new undergraduate program in Planning. The Curriculum Committee has discussed this program both last year, and in our Friday the 13th

Machel, Hans

56

ESnet Program Plan 1994  

SciTech Connect (OSTI)

This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

Merola, S.

1994-11-01T23:59:59.000Z

57

Northwest public utilities, BPA top five-year energy savings...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

public-utilities-BPA-top-five-year-energy-savings-target Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand...

58

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

relies heavily on coal as its energy source. Small-scaledominance of coal, providing 52% of energy inputs (includingrelying on coal for 52% of energy inputs (including

Zhiping, L.

2010-01-01T23:59:59.000Z

59

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

energy demand. The energy consumption mix i n China'sstructure and product mix in energy-intensive industries;Table 4). The sector's mix of energy sources that year was

Zhiping, L.

2010-01-01T23:59:59.000Z

60

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

in coking, sterling, ironmaking, and open hearth processes,injections for coke in ironmaking is a common practiceinjection methods i n ironmaking. Data from the Anshan Iron

Zhiping, L.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

by the Ministry of Metallurgy. (6) Coal gas recovery fromby the Ministry of Metallurgy. China's most energy-efficientNo. 1,1991. Ministry of Metallurgy (MOM), Zhongguo Gangti

Zhiping, L.

2010-01-01T23:59:59.000Z

62

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

of 165 conventional vertical cement kilns were mechanized,Small cement plants use vertical kilns and generally haveof cement kilns The mechanization of conventional vertical

Zhiping, L.

2010-01-01T23:59:59.000Z

63

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

which holds an energy conservation product trade fair everyState Economic and Trade Commission (SETC), organized energyOffice of Energy Conservation Work State Economie and Trade

Zhiping, L.

2010-01-01T23:59:59.000Z

64

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

Feng L i u , and Jonathan E. Sinton. China's energy system:Energy), No. 4,1991. Sinton, Jonathan E. Interviews withand Nanjing, May, 1994. Sinton, Jonathan E. and Mark D.

Zhiping, L.

2010-01-01T23:59:59.000Z

65

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

crude oil and oil products; (iii) retrofitting existing inefficient equipment; (iv) removing grossly inefficient equipment from service; (v) issuing energy-consumption

Zhiping, L.

2010-01-01T23:59:59.000Z

66

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

i n cement plants Installing electricity generation capacityelectricity generation was assumed to be a 6 MW power plant,electricity generation, then is considered to be the difference between actual energy consumption at the cogeneration plant

Zhiping, L.

2010-01-01T23:59:59.000Z

67

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

to investments in coal gas generation and distribution1991). (4) Power generation with coal gas recovered fromin the Sixth FYP, 20 coal gas power generation projects were

Zhiping, L.

2010-01-01T23:59:59.000Z

68

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

plants imported advanced technologies such as high-efficiency kilns in addition to renovating existing

Zhiping, L.

2010-01-01T23:59:59.000Z

69

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

under which existing heat supply boilers should be convertedUtilization Boiler and Heat Supply Retrofits Processplant conventional heat supply 1600 yuan/kW 150,000 yuan/ (

Zhiping, L.

2010-01-01T23:59:59.000Z

70

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

emissions recovery, and district heating projects. The mostSEC Strengthen management work in urban district heating.Expanding district heating management systems, open up new

Zhiping, L.

2010-01-01T23:59:59.000Z

71

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

projects to convert waste heat and pressure i n usefulkilns, installation of waste heat cogeneration capacity, andbricks, recovery of waste heat for drying and improvements,

Zhiping, L.

2010-01-01T23:59:59.000Z

72

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

and 0.4 for boiler conversion efficiency (Xu Derui,needs), efficiency standards, increasing boiler capacities,boilers and furnaces, and production of high-efficiency end-

Zhiping, L.

2010-01-01T23:59:59.000Z

73

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network [OSTI]

capacity came from cogeneration, fuel gas emissionsof waste heat cogeneration capacity, and improvements to theof energy (e.g. , cogeneration); (ix) improving energy

Zhiping, L.

2010-01-01T23:59:59.000Z

74

The University of Northern British Columbia Five Year Capital Plan  

E-Print Network [OSTI]

and for the regional campuses; · To estimate the cost of the recommended capital projects and to identify preferred its scope to recommending new capital projects with an estimated cost exceeding $1M. Other yet-to- be-completed capital projects with a cost below $1M previously reported to government are listed in Appendix 2

Northern British Columbia, University of

75

Page 1 of 20 A Five Year Diversity Plan Draft  

E-Print Network [OSTI]

Daughterty Carla Gary Susan Hardwick Robin Holmes Tomas Hulick Baiza Peter Keyes Khanh Le Linda Liu Chicora Laura Blake-Jones Doug Blandy Heather Bottorff Chris Browning James Chang Diane Del Guercio Kassia

Kleshchev, Alexander

76

Five-Year Technology Development Strategic Plan Targets EM's...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

their applications to current Office of D&D and Facility Engineering needs, and the EM Robot Challenge, an initiative to give robotic companies an opportunity to demonstrate...

77

EM Five-Year Plan (FY2008 - FY2012)  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergy DOEDealingVehicle1:Energy Independence & SecurityEMEnergy|of

78

Five-Year Technology Development Strategic Plan Targets EM's  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecordFederal Registry CommentsOverview »FINDINGDepartmentFiveDecommissioning

79

Environmental Justice Five-Year Implementation Plan - Second Annual  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPCof Energy 12,MaterialsDepartmentDepartment ofColumbia,

80

Environmental Justice Five-Year Implementation Plan - Third and Fourth  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPCof Energy 12,MaterialsDepartmentDepartment ofColumbia,Annual

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Environmental Justice Five-Year Implementation Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPCof Energy 12,MaterialsDepartmentDepartment

82

Environmental Justice Five-Year Implementation Plan - First Annual  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQBusinessinSupportingEnergy2Laboratory FlumeImpact

83

India's 11th Five-year Plan | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place: Eden Prairie, Minnesota Zip: 55344 Product:

84

Biomedical Engineering Program Assessment Plan Biomedical Engineering Program Assessment Plan  

E-Print Network [OSTI]

1 Biomedical Engineering Program Assessment Plan Biomedical Engineering Program in science and mathematics to address engineering problems in a biomedical context. a. Demonstrate a working sciences. b. Demonstrate ability to apply basic science concepts as foundations to biomedical engineering

Cantlon, Jessica F.

85

LDRD FY 2014 Program Plan  

SciTech Connect (OSTI)

As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

Anita Gianotto; Dena Tomchak

2013-08-01T23:59:59.000Z

86

Civilian radioactive waste management program plan. Revision 2  

SciTech Connect (OSTI)

This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

NONE

1998-07-01T23:59:59.000Z

87

Groundwater protection management program plan  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ``Groundwater Protection Management Program Plan`` (groundwater protection plan) of sufficient scope and detail to reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

Not Available

1992-06-01T23:59:59.000Z

88

TECHNOLOGY PROGRAM PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Department of Energy's (DOE) Carbon Capture program is conducted under the Clean Coal Research Program (CCRP). DOE's overarching mission is to increase the energy...

89

TECHNOLOGY PROGRAM PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Department of Energy's (DOE) Advanced Turbines program is conducted under the Clean Coal Research Program (CCRP). DOE's overarching mission is to increase the energy...

90

Quality Assurance Program Plan  

Broader source: Energy.gov [DOE]

The achievement of quality in LM activities and products requires implementation of a formal Quality Assurance (QA) Program. This program establishes principles, requirements, practices, and...

91

Agricultural Sciences Strategic Plan 20082013  

E-Print Network [OSTI]

Actions 15 Facilities and Land--Progress and Further Planning 24 FiveYear Recycling Plan and Program.This daring concept has led to a nationwide system of colleges and universities that create new knowledge

Kaye, Jason P.

92

Elf Atochem sets five-year emission targets  

SciTech Connect (OSTI)

As part of its first annual environmental report, released this month, Elf Atochem (Paris) has set targets for emission reductions at its sites for the next five years. Under the program, the company aims to slash the level of contaminants in discharge water by 30%; cut by half emissions of 17 [open quotes]priority[close quotes] substances-including ammonia, chlorofluorocarbons, vinyl chloride monomer, methyl methacrylate, aromatics, chlorinated solvent, ethylbenzene, and styrene-for which 1992 emissions totaled 15,996 m.t.; reduce nitrogen oxides (NO[sub x]) emissions by 25%; and increase the proportions of toxic waste treated in installations on the company's own sites, from 90% of 1992's 383,00 m.t., to 95%. Implementation of its environmental policy cost the company about F2 billion ($375 million), or 3.5%-4% of sales, in 1992. The policy focuses on safer and more efficient technologies, toxic emissions and waste, improving energy efficiency, and cooperation with customers and public authorities on the introduction of more environmentally friendly products. Atochem says it has led to a fourfold reduction in accidents at work between 1984 and 1992. Over the same period, water contamination at the company's French sites has been cut by 67%, measured against the French chemical industry association's [open quotes]water index[close quotes]. Some sites did even better than the average, with the Carling steam cracker complex in eastern France registering a drop in water contamination of more than 90% following a F150-million joint project with local French and German water authorities.

Young, I.

1993-04-21T23:59:59.000Z

93

Agent Program Planning Information Money Smart  

E-Print Network [OSTI]

Agent Program Planning Information Money Smart http participated in Money Smart classes: Habitat for Humanity, Head Start, workforce center clients, adult Planning Model plans have been developed for a Money Smart outcome plan and a Money Smart output plan

94

FIVE YEAR COMBINED BS-ENGINEERING / MS-MATERIALS PROGRAM  

E-Print Network [OSTI]

the way they do and thus enables engineers to better harness their potential in developing new an Engineering perspective, materials allow the embodiment of ideas to solve societal problems and to enhance our lives. Indeed, almost every aspect of modern life is touched by a technology made possible by advances

Fabrikant, Sara Irina

95

Municipal Energy Plan Program (Ontario, Canada)  

Broader source: Energy.gov [DOE]

Ontario is supporting local energy planning by introducing the Municipal Energy Plan (MEP) program. The MEP program is designed to help municipalities better understand their local energy needs ...

96

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Planning...  

Broader source: Energy.gov (indexed) [DOE]

PROGRAM: Project Planning Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Planning Checklist The following checklist is intended to provide system owners, project...

97

Monitoring Plan for Weatherization Assistance Program, State...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants Monitoring Plan for Weatherization Assistance...

98

Bonneville Power Administration Program Specific Recovery Plan...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Bonneville Power Administration Program Specific Recovery Plan Bonneville Power Administration Program Specific Recovery Plan Microsoft Word - PSRP May 15 2009 BPA Final.docx...

99

Computer Science at NCSU: The First Twenty-Five Years  

E-Print Network [OSTI]

Computer Science at NCSU: The First Twenty-Five Years Clay Griffith Paul D. Peterson, Jr. March 17 for the study of computer science. As early as 1960, J.A. Rigney of the Department of Statistics had written to Chancellor John T. Caldwell advocating a "Department of Computing Science." Nothing concrete came

Young, R. Michael

100

Performance assurance program plan  

SciTech Connect (OSTI)

B and W Protec, Inc. (BWP) is responsible for implementing the Performance Assurance Program for the Project Hanford Management Contract (PHMC) in accordance with DOE Order 470.1, Safeguards and Security Program (DOE 1995a). The Performance Assurance Program applies to safeguards and security (SAS) systems and their essential components (equipment, hardware, administrative procedures, Protective Force personnel, and other personnel) in direct support of Category I and H special nuclear material (SNM) protection. Performance assurance includes several Hanford Site activities that conduct performance, acceptance, operability, effectiveness, and validation tests. These activities encompass areas of training, exercises, quality assurance, conduct of operations, total quality management, self assessment, classified matter protection and control, emergency preparedness, and corrective actions tracking and trending. The objective of the Performance Assurance Program is to capture the critical data of the tests, training, etc., in a cost-effective, manageable program that reflects the overall effectiveness of the program while minimizing operational impacts. To aid in achieving this objective, BWP will coordinate the Performance Assurance Program for Fluor Daniel Hanford, Inc. (FDH) and serve as the central point for data collection.

Rogers, B.H.

1997-11-06T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

FIVE-YEAR WILKINSON MICROWAVE ANISOTROPY PROBE OBSERVATIONS: SOURCE CATALOG  

SciTech Connect (OSTI)

We present the list of point sources found in the Wilkinson Microwave Anisotropy Probe (WMAP) five-year maps. The technique used in the first-year and three-year analyses now finds 390 point sources, and the five-year source catalog is complete for regions of the sky away from the Galactic plane to a 2 Jy limit, with SNR >4.7 in all bands in the least covered parts of the sky. The noise at high frequencies is still mainly radiometer noise, but at low frequencies the cosmic microwave background (CMB) anisotropy is the largest uncertainty. A separate search of CMB-free V-W maps finds 99 sources of which all but one can be identified with known radio sources. The sources seen by WMAP are not strongly polarized. Many of the WMAP sources show significant variability from year to year, with more than a 2:1 range between the minimum and maximum fluxes.

Wright, E. L.; Chen, X. [UCLA Physics and Astronomy, P.O. Box 951547, Los Angeles, CA 90095-1547 (United States); Odegard, N.; Hill, R. S.; Weiland, J. L. [Adnet Systems, Inc., 7515 Mission Dr., Suite A100, Lanham, MD 20706 (United States); Bennett, C. L.; Gold, B.; Larson, D. [Department of Physics and Astronomy, Johns Hopkins University, 3400 N. Charles St., Baltimore, MD 21218-2686 (United States); Hinshaw, G.; Wollack, E.; Kogut, A. [Code 665, NASA/Goddard Space Flight Center, Greenbelt, MD 20771 (United States); Jarosik, N.; Page, L.; Dunkley, J. [Department of Physics, Jadwin Hall, Princeton University, Princeton, NJ 08544-0708 (United States); Komatsu, E. [Department of Astronomy, University of Texas, Austin, 2511 Speedway, RLM 15.306, Austin, TX 78712 (United States); Nolta, M. R. [Canadian Institute for Theoretical Astrophysics, University of Toronto, 60 St. George St., Toronto, ON M5S 3H8 (Canada); Spergel, D. N. [Department of Astrophysical Sciences, Peyton Hall, Princeton University, Princeton, NJ 08544-1001 (United States); Halpern, M. [Department of Physics and Astronomy, University of British Columbia, Vancouver, BC V6T 1Z1 (Canada); Limon, M. [Columbia Astrophysics Laboratory, 550 W. 120th St., Mail Code 5247, New York, NY 10027-6902 (United States); Meyer, S. S. [Departments of Astrophysics and Physics, KICP and EFI, University of Chicago, Chicago, IL 60637 (United States)], E-mail: wright@astro.ucla.edu (and others)

2009-02-15T23:59:59.000Z

102

Performance Demonstration Program Management Plan  

SciTech Connect (OSTI)

To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization’s quality assurance (QA) program and procedures or as otherwise directed by CBFO.

Carlsbad Field Office

2005-07-01T23:59:59.000Z

103

Site Support Program Plan Infrastructure Program  

SciTech Connect (OSTI)

The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

NONE

1995-09-26T23:59:59.000Z

104

LDRD Program Plan master  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample Environment: Magnet and6 th7525T3 Document5 Program

105

LDRD Program Plan master  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample Environment: Magnet and6 th7525T3 Document54 Program

106

Solid Waste Management Program Plan  

SciTech Connect (OSTI)

The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

Duncan, D.R.

1990-08-01T23:59:59.000Z

107

Program Building Committee's Central Planning Group.  

E-Print Network [OSTI]

Tooe ZTA245.7 8873 Y)O./3~ The Texas A&M (stem r ultural ~ion ~ervrce Damet C Plannstlel. Director College Stallon Program Building Committee's CENTRAL PLANNING GROUP 8-1344 Authors: Burl B. Richardson , Extension Program Specialist... and Mary G. Marshall, Extension Program Specialist Program -Building Committee's CENTRAL PLANNING GROUP This leaflet describes the role of the central planning group in the program development process_ The central planning group is the highest...

Richardson, Burl B.; Marshall, Mary G.

1982-01-01T23:59:59.000Z

108

Environmental Planning and Ecology Program Annual Report.  

SciTech Connect (OSTI)

The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

Larsen, Barbara L.

2008-01-01T23:59:59.000Z

109

Five Years of Tracking Heavy Ion Collisions at RHIC  

E-Print Network [OSTI]

Five years have passed since the first collisions of Au nuclei at the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory (BNL) on Long Island. With nucleon-nucleon center-of-mass energies of up to sqrt(s_NN)=200GeV RHIC provides the highest energy heavy ion collisions at any existing collider. To study the dynamics of nuclear matter at extreme temperatures and pressures hundreds of produced particles need to be tracked and identified, which provides a sizable challenge to the four experiments. This article tries to summarize these first years of RHIC operation from the detector point of view and give a glimpse at the future of the accelerator and its experiments.

A. Franz

2006-03-13T23:59:59.000Z

110

Hazardous Waste Compliance Program Plan  

SciTech Connect (OSTI)

The Hazardous Waste Compliance Program Plan (HWCPP) describes how the Rocky Flats Plant institutes a more effective waste management program designed to achieve and maintain strict adherence to the Resource Conservation and Recovery Act (RCRA) requirements. Emphasis is given to improve integration of line operations with programmatic and functional support activities necessary to achieve physical compliance to RCRA regulated equipment, facilities and operations at the floor level. This program focuses on specific activities occurring or which need to occur within buildings containing RCRA regulated units and activities. The plan describes a new approach to achieving and maintaining compliance. This approach concentrates authority and accountability for compliance with the line operating personnel, with support provided from the programmatic functions. This approach requires a higher degree of integration and coordination between operating and program support organizations. The principal changes in emphases are; (1) increased line operations involvement, knowledge and accountability in compliance activities, (2) improved management systems to identify, correct and/or avoid deficiencies and (3) enhanced management attention and employee awareness of compliance related matters.

Potter, G.L.; Holstein, K.A.

1994-05-01T23:59:59.000Z

111

Sample Lesson Plan Safety and Health Programs 1 Lesson Plan  

E-Print Network [OSTI]

culture that reduces accidents for workers and improves the bottom line for managers. When safetySample Lesson Plan ­ Safety and Health Programs 1 Lesson Plan General Industry Outreach Training Program (10-hour) Topic: Safety and Health Programs Overview Effective management of worker safety

Homes, Christopher C.

112

Pollution prevention program plan 1996  

SciTech Connect (OSTI)

This plan serves as the principal crosscutting guidance to Department of Energy (DOE) Headquarters, Operations Office, laboratory, and contractor management to fully implement pollution prevention programs within the DOE complex between now and 2000. To firmly demonstrate DOE`s commitment to pollution prevention, the Secretary of Energy has established goals, to be achieved by December 31, 1999, that will aggressively reduce DOE`s routine generation of radioactive, mixed, and hazardous wastes, and total releases and offsite transfers of toxic chemicals. The Secretary also has established sanitary waste reduction, recycling, and affirmative procurement goals. Site progress in meeting these goals will be reported annually to the Secretary in the Annual Report on Waste Generation and Waste Minimization Progress, using 1993 as the baseline year. Implementation of this plan will represent a major step toward reducing the environmental risks and costs associated with DOE operations.

NONE

1996-06-01T23:59:59.000Z

113

California Commissioning Collaborative: 2007 Program Plan  

E-Print Network [OSTI]

California Commissioning Collaborative: 2007 Program Plan Presented by: Jim Parks, Chair CCC Board of Directors November 1, 2007 © California Commissioning Collaborative © California Commissioning Collaborative Mission and Organization • Improve... and RCx as a strategy for meeting efficiency goals • CCC projects provide support and resources © California Commissioning Collaborative 2007 Program Plan • Support for Retrocommissioning Programs – Verification of Savings • Retrocommissioning Market...

Parks, J.

2007-01-01T23:59:59.000Z

114

Planning the Annual 4-H Program  

E-Print Network [OSTI]

A well-planned program gives direction to 4-H throughout the year. Advanced planning outlines each person's responsibilities, allows ample time to prepare, and makes certain all members have a chance to be involved during the year. This publication...

Howard, Jeff W.

2005-05-10T23:59:59.000Z

115

Planning the Annual 4-H Program (Spanish)  

E-Print Network [OSTI]

A well-planned program gives direction to 4-H throughout the year. Advanced planning outlines each person? responsibilities, allows ample time to prepare and makes certain all members have a chance to be involved during the year. This publication...

Howard, Jeff W.

2005-05-10T23:59:59.000Z

116

Planning for Biodiversity Conservation Using Stochastic Programming  

E-Print Network [OSTI]

9 Planning for Biodiversity Conservation Using Stochastic Programming Trevon Fuller,1 David P biodiversity features worldwide have prompted the development of a systematic planning framework biol- ogy, biodiversity. 9.1 Introduction Conservation areas are broadly defined as sites administered

Morton, David

117

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

2005-08-26T23:59:59.000Z

118

Optics and Optical Engineering Program Assessment Plan Program Learning Objectives  

E-Print Network [OSTI]

Optics and Optical Engineering Program Assessment Plan Program Learning, and processes that underlie optics and optical engineering. 2. Strong understanding of the fundamental science, mathematics, and processes that underlie optics and optical

Cantlon, Jessica F.

119

CHEMICAL ENGINEERING PROGRAM ASSESSMENT PLAN Program Learning Objectives  

E-Print Network [OSTI]

education necessary to understand the impact of engineering solutions in a global, economic, environmental20 CHEMICAL ENGINEERING PROGRAM ASSESSMENT PLAN Program Learning Objectives of mathematics, science, and engineering (b) an ability to design and conduct experiments, as well

Cantlon, Jessica F.

120

SMUD's HVAC Programs Ravi Patel-Program Planning  

E-Print Network [OSTI]

1 SMUD's HVAC Programs 5-7-13 Ravi Patel- Program Planning Bruce Baccei- R&D #12;SMUD's Residential contractors trained and BPI certified ­ Majority were pushing only HVAC; now driving the HPP · Program encourages more HVAC replacements to occur through HPP ­ Move away from stand alone programs ­ Start

California at Davis, University of

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

24 Command Fire Improvement Action Program Plan  

SciTech Connect (OSTI)

Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

GRIFFIN, G.B.

2000-12-01T23:59:59.000Z

122

Natural Gas Multi-Year Program Plan  

SciTech Connect (OSTI)

This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

NONE

1997-12-01T23:59:59.000Z

123

Endovascular Treatment of Femoropopliteal Aneurysms: A Five-Year Experience  

SciTech Connect (OSTI)

Purpose. To assess the effectiveness of endovascular treatment of femoropopliteal aneurysms (FPAs). Methods. In the last 5 years, we have treated 17 FPAs (diameter 21-75 cm, mean 38.4 cm; length 27-100 cm, mean 72.5 cm) in 15 patients (age 57-80 years, mean 70.9 years). The diagnosis was obtained by color Doppler ultrasound (CDU) and the procedure was planned by CT angiography (CTA) and preprocedural angiography. Eight FPAs were excluded with only one stent-graft; in 8 patients, two stent-grafts were positioned; and in 1 patient, three stent-grafts were used. In 14 cases we used a Wallgraft endoprosthesis, in 2 cases a Hemobahn, and in 1 case an Excluder contralateral leg. The patients were followed up with CDU and occasionally with CTA. Results. Immediate technical success was obtained in 17 of 17 cases (100%). One patient died during the first year. During a mean follow-up of 26.9 months (range 3-60 months) we observed 6 of 16 (38%) stent-graft occlusions (3 of which were recanalized with locoregional thrombolysis and 3 with mechanical thrombectomy). Two stent-grafts were patent at 12 and 24 months. Four patients experienced subsequent occlusions and recanalizations until corrected by surgical bypass (1 at 14 months, 2 at 18 months, and 1 at 36 months). Therefore the primary patency was 63% and assisted patency was 73%. Conclusion. The endovascular approach is a minimally invasive treatment option for FPAs. Moreover endovascular stent-grafting does not necessarily preclude conventional surgical repair, but it can delay it. Longer follow-up will be needed to determine the long-term patency rate.

Lagana, Domenico, E-mail: donlaga@gmail.com; Carrafiello, Gianpaolo; Mangini, Monica [University of Insubria, Department of Radiology (Italy); Caronno, Roberto [University of Insubria, Department of Vascular Surgery (Italy); Giorgianni, Andrea; Lumia, Domenico [University of Insubria, Department of Radiology (Italy); Castelli, Patrizio [University of Insubria, Department of Vascular Surgery (Italy); Fugazzola, Carlo [University of Insubria, Department of Radiology (Italy)

2006-10-15T23:59:59.000Z

124

Ground water protection management program plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 5400.1 requires the establishment of a ground water protection management program to ensure compliance with DOE requirements and applicable federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office was prepared this Ground Water Protection Management Program Plan (ground water protection plan) whose scope and detail reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter III, for special program planning. This ground water protection plan highlights the methods designed to preserve, protect, and monitor ground water resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies technical guidance documents and site-specific documents for the UMTRA Project ground water protection management program. In addition, the plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA Project sites.

Not Available

1994-02-01T23:59:59.000Z

125

assessment program plan: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Biomedical Engineering Program Assessment Plan Program Learning Objectives 1. Students should be able to draw upon basic knowledge knowledge of the basic principles of...

126

HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program  

E-Print Network [OSTI]

HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency-Arriving Summer/Fall Chinook 97 Table B.5 Tribal Incidental Take Thresholds for ESA-Listed 98 Upper Columbia River

127

2009 CAPS Spring Forecast Program Plan  

E-Print Network [OSTI]

package. · Two 18 UTC update forecasts on demand basis, with the same domain and configuration, running2009 CAPS Spring Forecast Experiment Program Plan April 20, 2009 #12;2 Table of Content 1. Overview .......................................................................................................4 3. Forecast System Configuration

Droegemeier, Kelvin K.

128

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

2005-08-26T23:59:59.000Z

129

Science Plan for the Atmospheric Radiation Measurement Program (ARM)  

SciTech Connect (OSTI)

The purpose of this Atmospheric Radiation Measurement (ARM) Science Plan is to articulate the scientific issues driving the ARM Program, and to relate them to DOE`s programmatic objectives for ARM, based on the experience and scientific progress gained over the past five years. ARM programmatic objectives are to: (1) Relate observed radiative fluxes and radiances in the atmosphere, spectrally resolved and as a function of position and time, to the temperature and composition of the atmosphere, specifically including water vapor and clouds, and to surface properties, and sample sufficient variety of situations so as to span a wide range of climatologically relevant possibilities; (2) develop and test parameterizations that can be used to accurately predict the radiative properties and to model the radiative interactions involving water vapor and clouds within the atmosphere, with the objective of incorporating these parameterizations into general circulation models. The primary observational methods remote sending and other observations at the surface, particularly remote sensing of clouds, water vapor and aerosols.

NONE

1996-02-01T23:59:59.000Z

130

River Protection Project (RPP) Environmental Program Plan  

SciTech Connect (OSTI)

This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

POWELL, P.A.

2000-03-29T23:59:59.000Z

131

BETO Announces Updated Multi-Year Program Plan: November 2014...  

Broader source: Energy.gov (indexed) [DOE]

update of the MYPP. Addthis Related Articles Update Released to BETO's Multi-Year Program Plan BETO Announces Updated Multi-Year Program Plan DOE Publishes Updated SSL R&D Plan...

132

HOSPITAL LAUNDRY STANDARDS AND ENERGY CONSERVATION: A PROGRAM PLAN  

E-Print Network [OSTI]

STANDARDS AND ENERGY CONSERVATION: LAWRENCE A PROGRAM PLANLAUNDRY STANDARDS AND ENERGY CONSERVATION: A PROGRAM PLANLAUNDRY STANDARDS AND ENERGY CONSERVATION: A PROGRAM PLAN

Battles, Donald R.

2014-01-01T23:59:59.000Z

133

Environmental Restoration Program Document Control Plan  

SciTech Connect (OSTI)

This Environmental Restoration (ER) Program Document Control Plan has been developed to comply with the document control system requirements of the US Department of Energy, Richland Operations Office (RL), the Hanford Federal Facility and the ER Program. One of the five components, or summary subprojects, of the Environmental Restoration (ER) Program is program management and support, which includes both management systems development and information and data management. Efforts within the management systems development area include the creation of a document control plan. Westinghouse Hanford Company (WHC) has developed and established an overall document control system that governs the methods by which all WHC documents are generated, maintained, and disposed of. The ER Program performing organizations within WHC utilize the established WHC document control systems to the maximum extent possible. These systems are discussed in Chapters 3.0 and 4.0 of this plan. In addition, this plan describes the documents that require control within the ER Program and how they will be controlled.

Montgomery, L.M.

1993-09-01T23:59:59.000Z

134

TROPOSPHERIC AEROSOL PROGRAM, PROGRAM PLAN, MARCH 2001  

SciTech Connect (OSTI)

The goal of Tropospheric Aerosol Program (TAP) will be to develop the fundamental scientific understanding required to construct tools for simulating the life cycle of tropospheric aerosols--the processes controlling their mass loading, composition, and microphysical properties, all as a function of time, location, and altitude. The TAP approach to achieving this goal will be by conducting closely linked field, modeling, laboratory, and theoretical studies focused on the processes controlling formation, growth, transport, and deposition of tropospheric aerosols. This understanding will be represented in models suitable for describing these processes on a variety of geographical scales; evaluation of these models will be a key component of TAP field activities. In carrying out these tasks TAP will work closely with other programs in DOE and in other Federal and state agencies, and with the private sector. A forum to directly work with our counterparts in industry to ensure that the results of this research are translated into products that are useful to that community will be provided by NARSTO (formerly the North American Research Strategy on Tropospheric Ozone), a public/private partnership, whose membership spans government, the utilities, industry, and university researchers in Mexico, the US, and Canada.

SCHWARTZ,S.E.; LUNN,P.

2001-03-01T23:59:59.000Z

135

Atmospheric Radiation Measurement Program Science Plan  

SciTech Connect (OSTI)

The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative transfer, aerosol science, determination of cloud properties, cloud modeling, and cloud parameterization testing and development. The focus of ARM science has naturally shifted during the last few years to an increasing emphasis on modeling and parameterization studies to take advantage of the long time series of data now available. During the next 5 years, the principal focus of the ARM science program will be to: Maintain the data record at the fixed ARM sites for at least the next five years. Improve significantly our understanding of and ability to parameterize the 3-D cloud-radiation problem at scales from the local atmospheric column to the global climate model (GCM) grid square. Continue developing techniques to retrieve the properties of all clouds, with a special focus on ice clouds and mixed-phase clouds. Develop a focused research effort on the indirect aerosol problem that spans observations, physical models, and climate model parameterizations. Implement and evaluate an operational methodology to calculate broad-band heating rates in the atmospheric columns at the ARM sites. Develop and implement methodologies to use ARM data more effectively to test atmospheric models, both at the cloud-resolving model scale and the GCM scale. Use these methodologies to diagnose cloud parameterization performance and then refine these parameterizations to improve the accuracy of climate model simulations. In addition, the ARM Program is actively developing a new ARM Mobile Facility (AMF) that will be available for short deployments (several months to a year or more) in climatically important regions. The AMF will have much of the same instrumentation as the remote facilities at ARM's Tropical Western Pacific and the North Slope of Alaska sites. Over time, this new facility will extend ARM science to a much broader range of conditions for model testing.

Ackerman, T

2004-10-31T23:59:59.000Z

136

Fermilab | Directorate | Program Planning Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing ZirconiaPolicyFeasibility ofSmall15.000 Rev. 0JosephOrganizationOfficesProgram

137

Program Plans | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil'sofAppendix B, September 2010Program Overview

138

Lightweight materials for transportation: Program plan  

SciTech Connect (OSTI)

This Program Plan has been prepared by the Office of Transportation Materials in response to a request by the House Committee on Appropriations. It recognizes that a significant commitment to long-term, stable materials research and development (R&D) is required to realize the benefits of lighter weight vehicles, including economic, environmental and energy related benefits. Extensive input was obtained from the major US automakers and from representative materials and component suppliers. Considerable interaction with the key members of the US Automotive Materials Partnership (USAMP) has ensured consistency of technical direction. The program will support R&D activity at industrial sites through competitively bid subcontracts with cost sharing anticipated at 30--50%, with the higher amounts in process scale-up and manufacturing technology development. The recommended LWM Program will enable industry to develop pecessary technology by utilizing their capabilities as well as accessing supporting technology at national laboratories, universities, ongoing program activity at NASA, DoD, DOT, NIST, etc., and thereby leverage industry resources through integrated team approaches. Many individual program efforts are currently in place that address small portions of the overall needs of the LWM Program, both within DOE and in other agencies. Cognizance of these and overall integration of research activities are planned as significant program management tasks. Because of the international nature of the automobile business, benchmarking of foreign technology and tracking of worldwide developments are also key program elements.

Not Available

1993-07-01T23:59:59.000Z

139

HATCHERY AND GENETIC MANAGEMENT PLAN Hatchery Program  

E-Print Network [OSTI]

HATCHERY AND GENETIC MANAGEMENT PLAN (HGMP) Hatchery Program: Species or Hatchery Stock: Agency Take Thresholds for ESA-Listed 44 Upper Columbia River Steelhead Table 4. Tribal & Recreational Incidental Take Thresholds 45 for Unmarked Spring Chinook Table 5. Estimated Carrying Capacity of Natural

140

Planning for Biodiversity Conservation Using Stochastic Programming  

E-Print Network [OSTI]

9 Planning for Biodiversity Conservation Using Stochastic Programming Trevon Fuller,1 David P biol- ogy, biodiversity. 9.1 Introduction Conservation areas are broadly defined as sites administered for the protection of threatened species and other features of biodiversity. However, many conservation ar- eas

Sarkar, Sahotra

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Egypt's population policies and family planning program: a critical examination.  

E-Print Network [OSTI]

??Egypt's national family planning program, in existence since 1965, has been fairly successful in increasing the use of family planning methods and lowering the population… (more)

Carr, Aline B.

2012-01-01T23:59:59.000Z

142

Waste Management Program management plan. Revision 1  

SciTech Connect (OSTI)

As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

NONE

1997-02-01T23:59:59.000Z

143

Bioenergy Technologies Office Multi-Year Program Plan: May 2013...  

Energy Savers [EERE]

Bioenergy Technologies Office Multi-Year Program Plan: May 2013 Update Bioenergy Technologies Office Multi-Year Program Plan: May 2013 Update This is the May 2013 Update to the...

144

DOE Hydrogen and Fuel Cells Program Plan (September 2011)  

Fuel Cell Technologies Publication and Product Library (EERE)

The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities

145

FY 1999 annual work plan for infrastructure program WBS 6  

SciTech Connect (OSTI)

The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

Donley, C.D.

1998-08-27T23:59:59.000Z

146

Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan  

E-Print Network [OSTI]

energy in the total energy mix was determined in theOther energy in the total energy mix was much smaller thanwell as the different mix of energy and economic structure

Ohshita, Stephanie

2011-01-01T23:59:59.000Z

147

Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan  

E-Print Network [OSTI]

complemented with carbon intensity targets, to explicitlybe complemented with carbon intensity targets, to explicitlyin the provinces. Carbon Intensity. The methodology can also

Ohshita, Stephanie

2011-01-01T23:59:59.000Z

148

Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan  

E-Print Network [OSTI]

energy intensity (energy per unit GDP) in the 11 th FYP. Forintensity (total energy per unit GDP)  industrial energyof total (primary) energy per unit GDP in fixed 2005 RMB [

Ohshita, Stephanie

2011-01-01T23:59:59.000Z

149

Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan  

E-Print Network [OSTI]

projections of energy and intensity for the 12 th FYP werelevel projections of energy and intensity for the 12 th FYPth APPENDIX Table A-2 Energy Intensity Target Allocation

Ohshita, Stephanie

2011-01-01T23:59:59.000Z

150

4 + 1: Five Year Path to the BS in Environmental Design + Master of Regional Planning  

E-Print Network [OSTI]

Semester Credits EnvirDes 591B Sustainable Cities 3 EnvirDes 544 History of Landscape Architecture II 3 Education #2 (EnvirDes 140, AT) 4 General Education #3 (BS) 4 General Education #4 (SB) 4 Total credits for semester 15 Spring Semester Credits EnvirDes 205 Dynamics of Human Habitation 4 General Education #5 (PS) 4

Massachusetts at Amherst, University of

151

Total quality management applications for Hanford`s five-year plan and public outreach  

SciTech Connect (OSTI)

The US Department of Energy has encountered problems and experienced successes and failures in the cleanup of the Hanford Site in Washington State. This paper focuses on (1) internal problems involved in managing this large and complex cleanup; (2) attempts at overcoming these problems; (3) problems and attempts at solutions in describing cleanup activities to the public and other government entities. It describes the Total Quality Management (TQM) approaches used in trying to solve these problems.

Peterson, J.M. [USDOE Richland Operations Office, WA (United States)

1993-12-31T23:59:59.000Z

152

Five Year Plan Update Leishman 631 Helicopter Aerodynamics I X X X X  

E-Print Network [OSTI]

2017 Rotorcraft Leishman 631 Helicopter Aerodynamics I X X X X Leishman 632 Helicopter Aerodynamics II X Aerodynamics & Propulsion Sedwick 663 Intro to Plasmas for Space Prop/Powr X X Yu 665 Advanced of Aerodynamics Jones 672 Low Reynods Number Aerodynamics X X X X Cadou 674 Aerodynamics of Comp. Fluids X X

Shapiro, Benjamin

153

Second Five-Year Plan to Address Uranium Contamination in the Navajo Nation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBi (2) Sr (2)ScienceScientists InSearchsuperconduct*Chu| Department

154

Department of Energy Five Year Plans, FY2007-2011 and FY2008-FY2012 |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005 (Thousand Barrels, ExceptFS-15-103UsEnergy.govDepartment of Energy

155

Safeguards and Security Program Planning and Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The manual establishes program planning and management requirements for the Department’s Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

2005-08-26T23:59:59.000Z

156

Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)  

SciTech Connect (OSTI)

This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

Not Available

1994-09-01T23:59:59.000Z

157

Reasoning about Plan Revision in Agent Programs Natasha Alechina  

E-Print Network [OSTI]

and executing a plan a b p Plan(a;b) Natasha Alechina Reasoning about plan revision TIME 2012 5 / 46 #12;WhatReasoning about Plan Revision in Agent Programs Natasha Alechina University of Nottingham, UK TIME 2012, Leicester 14 September 2012 Natasha Alechina Reasoning about plan revision TIME 2012 1 / 46 #12

Fisher, Michael

158

Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000  

SciTech Connect (OSTI)

This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

Not Available

1994-11-01T23:59:59.000Z

159

N Reactor Deactivation Program Plan. Revision 4  

SciTech Connect (OSTI)

This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.

Walsh, J.L.

1993-12-01T23:59:59.000Z

160

United States hurricane landfalls and damages: Can one-to five-year predictions beat climatology?  

E-Print Network [OSTI]

United States hurricane landfalls and damages: Can one-to five-year predictions beat climatology the climatological record. The paper argues that the large diversity of available predictions means that some predictions will improve upon climatology, but for decades if not longer it will be impossible to know whether

Colorado at Boulder, University of

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

California's Electricity Supply and Demand Balance Over the Next Five Years  

E-Print Network [OSTI]

the resources of the system. The Commission's 2003 Baseline Demand forecast assumes the following assumptions September October 1 CEC 2003 Baseline Demand Forecast (1-in-2 Weather)1, 2 31 California's Electricity Supply and Demand Balance Over the Next Five Years The Energy Commission

162

Westinghouse Hanford Company Pollution Prevention Program Implementation Plan  

SciTech Connect (OSTI)

This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

Floyd, B.C.

1994-10-01T23:59:59.000Z

163

Planning aquatic ecosystem restoration monitoring programs  

SciTech Connect (OSTI)

This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

Thom, R.M.; Wellman, K.F.

1997-01-01T23:59:59.000Z

164

Resource Conservation and Recovery Act (RCRA). Facility Investigation Program Plan  

SciTech Connect (OSTI)

This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication ``Characterization of Hazardous Waste Sites`` has been liberally adapted for use in this RFI Program Plan.

Not Available

1989-06-30T23:59:59.000Z

165

Updated 7/2014Post-MS Program Plan DNP Program Course Plan  

E-Print Network [OSTI]

and Health Informatics 3 Total 3 Total 3 Total 3 Year2 Advanced Practice Nursing Theory* (N722 or N741 or N751) 3 N761 Program Planning, Evaluation and Quality Improvement 3 N708 Ethics for Advanced Practice in Health Care 2 Elective (can be taken any semester) 3 Total 6 Total 3 Total 2 Year3 N828 Clinical

Sheridan, Jennifer

166

Updated 7/2014Post-BS Full-Time Program Plan DNP Program Course Plan  

E-Print Network [OSTI]

and Application of Evidence- Based Practice 3 Total 12 Total 12 Total 6 Year2 N726 Foundations for APN Clinical761 Program Planning, Evaluation and Quality Improvement 3 N772 Leadership and Organizational Decision Making in Health Care 3 Elective (can be taken any semester) 3 Total 12 Total 12 Total 2 Year3 N826

Sheridan, Jennifer

167

Updated 7/2014Post-BS Part-Time Program Plan DNP Program Course Plan  

E-Print Network [OSTI]

Pathophysiology 3 N761 Program Planning, Evaluation and Quality Improvement 3 Total 6 Total 6 Total 3 Year2 N704 Psychiatric Mental Health **N828/829: variable 2-4 credits with 6 credits total required ***N906: 6 credits total required, may be completed in two semesters with consent of faculty advisor and N906 course

Sheridan, Jennifer

168

Five-Year NRHP Re-Evaluation of Historic Buildings Assessment  

SciTech Connect (OSTI)

The Lawrence Livermore National Laboratory (LLNL) 'Draft Programmatic Agreement among the Department of Energy and the California State Historic Preservation Officer Regarding Operation of Lawrence Livermore National Laboratory' requires a review and re-evaluation of the eligibility of laboratory properties for the National Register of Historic Places (NRHP) every five years. The original evaluation was published in 2005; this report serves as the first five-year re-evaluation. This re-evaluation includes consideration of changes within LLNL to management, to mission, and to the built environment. it also determines the status of those buildings, objects, and districts that were recommended as NRHP-eligible in the 2005 report. Buildings that were omitted from the earlier building list, those that have reached 50 years of age since the original assessment, and new buildings are also addressed in the re-evaluation.

Ullrich, R A; Heidecker, K R

2011-09-12T23:59:59.000Z

169

FY97 Geothermal R&D Program Plan  

SciTech Connect (OSTI)

This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

None

1996-09-01T23:59:59.000Z

170

Site support program plan for ICF Kaiser Hanford Company  

SciTech Connect (OSTI)

The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

Dieterle, S.E.

1996-09-27T23:59:59.000Z

171

Egypt's population policies and family planning program: a critical examination  

E-Print Network [OSTI]

Egypt's national family planning program, in existence since 1965, has been fairly successful in increasing the use of family planning methods and lowering the population growth rate in Egypt. However, the fact that as few as 10 percent of women...

Carr, Aline B.

1996-01-01T23:59:59.000Z

172

Program Overview Our objective is to equip 25 students over a five year period  

E-Print Network [OSTI]

in Population Studies K. Renee Fister*, Christopher J. Mecklin*, Maeve L. McCarthy*, David Roach*, Terry L disturbances. · Sarah Thomason, Michael Whitby, Nicole Gerlanc, and David Roach This project involves, and David Roach) BioMath Seminar In order to further develop our collaborations, we have run

McCarthy, Maeve L.

173

US RERTR Program: overview, status and plans  

SciTech Connect (OSTI)

The status of the Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a brief review of the accomplishments which the RERTR Program, in cooperation with its many international partners, had achieved by the end of 1983 in the area of LEU research reactor fuels development and application, emphasis is placed on the RERTR Program developments which took place during 1984 and on current plans and schedules. The RERTR progress in 1984 has been significant, with solid accomplishments and few surprises. Most LEU U/sub 3/Si/sub 2/-Al irradiation tests with 4.8 g U/cm/sup 3/ have been successfully completed, and contract negotiations are under way for the procurement of a whole-core demonstration of this fuel in the ORR. The demonstration is to begin in mid-1985 and to last for approximately eighteen months. Qualification of U/sub 3/Si/sub 2/-Al fuel with 7 g U/cm/sup 3/ is scheduled for 1989. International cooperation among fuel developers, commercial vendors, and reactor operators has been essential to the progress which has been achieved. With continued international cooperation, it will be feasible to significantly reduce HEU usage in research reactors in the next few years.

Travelli, A.

1984-01-01T23:59:59.000Z

174

Continual Learning Program/Individual Training Plans- No Excuses  

Broader source: Energy.gov [DOE]

The Continual Learning Program (CLP) currently has 4 workshops that focus on employee development. The Individual Development Plan (IDP) is one of the resources discussed in the workshops.

175

State Energy Program Strategic Plan for the 21st Century  

Broader source: Energy.gov [DOE]

Representatives of DOE and the States initiated development of this Strategic Plan to clearly define the program's goals for the next 10 years.

176

Guadalupe Valley Electric Cooperative- Conservation Plan 7 Loan Program  

Broader source: Energy.gov [DOE]

Guadalupe Valley Electric Cooperative offers an incentive for members to increase the energy efficiency of existing homes and facilities through the Conservation Plan 7 Loan Program. The loan...

177

State Energy Program Helps States Plan and Implement Efficiency...  

Office of Environmental Management (EM)

More Documents & Publications State Energy Program Helps States Plan and Implement Energy Efficiency Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;...

178

Quality Assurance Program Plan for FFTF effluent controls. Revision 1  

SciTech Connect (OSTI)

This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification.

Seamans, J.A.

1995-06-08T23:59:59.000Z

179

QA program plan plutonium stabilization and handling project W-460  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460.

SCHULTZ, J.W.

1999-09-02T23:59:59.000Z

180

Program Academic Quality Plan Department of Construction Management  

E-Print Network [OSTI]

Program Academic Quality Plan Department of Construction Management Bowling Green State University://www.bgsu.edu/colleges/technology/undergraduate/cmt/index.html Integral in this effort is our Program Academic Quality Plan. I. Bowling Green State University Mission Bowling Green State University provides educational experiences inside and outside the classroom

Moore, Paul A.

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Power Planning and Fish and Wildlife Program Development  

E-Print Network [OSTI]

Power Planning and Fish and Wildlife Program Development RELATIONSHIP OF THE POWER PLAN TO THE FISH AND WILDLIFE PROGRAM: SUFFICIENT RESOURCES TO MEET ELECTRICITY DEMANDS AND THE REQUIREMENTS FOR FISH and to accommodate system operations to benefit fish and wildlife. The central purpose of this chapter of the power

182

Who's Evaluating What? Planned Program Evaluations | Department...  

Energy Savers [EERE]

Neighborhood Program Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Getting Useful Real-Time Feedback About Your Program...

183

GEOTHERMAL RESERVOIR ENGINEERING MANGEMENT PROGRAM PLAN (GREMP PLAN)  

E-Print Network [OSTI]

2 Mission of Division of Geothermal Energy . . . . .Coordination with Other Geothermal Programs . . . . . . 6the Behavior of Geothermal Systems . . . . . . . . . 1 6

Bloomster, C.H.

2010-01-01T23:59:59.000Z

184

Light Water Reactor Sustainability Program Integrated Program Plan  

SciTech Connect (OSTI)

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

McCarthy, Kathryn A. [INL; Busby, Jeremy [ORNL; Hallbert, Bruce [INL; Bragg-Sitton, Shannon [INL; Smith, Curtis [INL; Barnard, Cathy [INL

2014-04-01T23:59:59.000Z

185

Light Water Reactor Sustainability Program Integrated Program Plan  

SciTech Connect (OSTI)

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

Kathryn McCarthy; Jeremy Busby; Bruce Hallbert; Shannon Bragg-Sitton; Curtis Smith; Cathy Barnard

2013-04-01T23:59:59.000Z

186

Five-Year Review of CERCLA Response Actions at the Idaho National Laboratory  

SciTech Connect (OSTI)

This report summarizes the documentation submitted in support of the five-year review or remedial actions implemented under the Comprehensive Environmental Response, Compensation, and Liability Act Sitewide at the Idaho National Laboratory. The report also summarizes documentation and inspections conducted at the no-further-action sites. This review covered actions conducted at 9 of the 10 waste area groups at the Idaho National Laboratory, i.e. Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 9, and 10. Waste Area Group 8 was not subject to this review, because it does not fall under the jurisdiction of the U.S. Department of Energy Idaho Operations Office. The review included past site inspections and monitoring data collected in support of the remedial actions. The remedial actions have been completed at Waste Area Groups 2, 4, 5, 6, and 9. Remedial action reports have been completed for Waste Area Groups 2 and 4, and remedial action reports are expected to be completed during 2005 for Waste Area Groups 1, 5, and 9. Remediation is ongoing at Waste Area Groups 3, 7, and 10. Remedial investigations are yet to be completed for Operable Units 3-14, 7-13/14, and 10-08. The review showed that the remedies have been constructed in accordance with the requirements of the Records of Decision and are functioning as designed. Immediate threats have been addressed, and the remedies continue to be protective. Potential short-term threats are being addressed though institutional controls. Soil cover and cap remedies are being maintained properly and inspected in accordance with the appropriate requirements. Soil removal actions and equipment or system removals have successfully achieved remedial action objectives identified in the Records of Decision. The next Sitewide five-year review is scheduled for completion by 2011.

W. L. Jolley

2007-02-01T23:59:59.000Z

187

Light Water Reactor Sustainability Program Integrated Program Plan  

SciTech Connect (OSTI)

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

George Griffith; Robert Youngblood; Jeremy Busby; Bruce Hallbert; Cathy Barnard; Kathryn McCarthy

2012-01-01T23:59:59.000Z

188

Storm Water Management Plan Program (Nebraska)  

Broader source: Energy.gov [DOE]

This legislation implements the National Pollutant Discharge Elimination System Requirements, and encourages cities and counties to create stormwater management plans in order to receive grant...

189

Technology Innovation Program Programmatic Plan: FY 2011 FY 2014  

E-Print Network [OSTI]

Technology Innovation Program Programmatic Plan: FY 2011 ­ FY 2014 Critical National Need Area & intelligent automation (#3) Technologies to enable a smart grid (#4) Technologies for water availability (#6) Sustainability Technologies for personalized medicine (#5) Complex networks Manufacturing Advanced sensing

Magee, Joseph W.

190

THE MASTER OF ENGINEERING IN MANUFACTURING ENGINEERING PROGRAM PLANNING SHEET  

E-Print Network [OSTI]

for Manufacturing ME 526 Simulation of Physical Processes ME 535 Green Manufacturing METHE MASTER OF ENGINEERING IN MANUFACTURING ENGINEERING PROGRAM PLANNING SHEET be at the 500 level or above. 1. Core Manufacturing Requirement ­ 24 credits

191

Planning guidance for the Chemical Stockpile Emergency Preparedness Program  

SciTech Connect (OSTI)

This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others] and others

1995-02-01T23:59:59.000Z

192

Student Judicial Programs 2010-2011 Strategic Plan  

E-Print Network [OSTI]

Student Judicial Programs 2010-2011 Strategic Plan Updated: August 19, 2010 Mission Promoting Student Success Vision Student Judicial Programs will challenge students to become active participants and educationally adjudicating alleged violations of the Code of Student Conduct. Values As a member of the campus

Rock, Chris

193

Oil program implementation plan FY 1996--2000  

SciTech Connect (OSTI)

This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

NONE

1995-04-01T23:59:59.000Z

194

Transuranic Waste Characterization Quality Assurance Program Plan  

SciTech Connect (OSTI)

This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

NONE

1995-04-30T23:59:59.000Z

195

Tanks focus area multiyear program plan - FY96-FY98  

SciTech Connect (OSTI)

The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary.

NONE

1995-07-01T23:59:59.000Z

196

Fiscal year 1986 program plan for the Defense Transuranic Waste Program (DTWP)  

SciTech Connect (OSTI)

The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy is national planning, integration, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 86 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of all R D activities meet requirements tated in the Technical Management Plan for the Transuranic Waste Management Program. The Program Plan is revised as needed. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 86; outyear budget projections are presented for future years.

Not Available

1985-11-01T23:59:59.000Z

197

Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program  

Broader source: Energy.gov [DOE]

Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

198

California Sea Grant College Program Strategic Plan  

E-Print Network [OSTI]

Program, U.S. Department of Commerce, National Oceanic and Atmospheric Administration, supported environmental, social and economic needs of people in our coastal, ocean, and Great Lakes regions. A searchable....................................................................................15 Healthy Coastal & Marine Ecosystems (HCME).....................16 Resilient Coastal Communities

Jaffe, Jules

199

Program Development Plan and Team up  

SciTech Connect (OSTI)

The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

Solar Electric Power Association

2001-12-01T23:59:59.000Z

200

Geochemical engineering and materials program plan  

SciTech Connect (OSTI)

The Department of Energy (DOE) was designated as lead agency in discharging the overall legislative mandate for federal R&D to assist the private sector in developing appropriate technology for exploiting geothermal energy resources. The Geochemical Engineering and Materials (GEM) Program was conceived, as part of DOE'S overall strategy, to address specific and plant-wide problems and uncertainties in the use of materials and in geochemical engineering. This program assists industry in the conduct of long-term,high-risk R&D needed to overcome the significant technical and economic GEM-related obstacles faced by developers and potential developers of this alternative energy source. The program focuses on: (1) Increasing the knowledge about the properties of materials and their performance under geothermal energy system conditions; (2) Developing and utilizing more reliable and/or cost-effective materials than previously available; and (3) Developing a greater understanding of and control over geochemical processes during fluid production and transport, energy conversion, and waste management. As a stand-alone program and as support to other DOE geothermal technology development programs, the GEM Program contributes to the feasibility of designing and operating efficient, reliable, and safe fluid handling and energy conversion systems.

None

1982-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

2000-06-10T23:59:59.000Z

202

Oak Ridge National Laboratory institutional plan, FY 1996--FY 2001  

SciTech Connect (OSTI)

This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years. Included in the report are: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory strategic plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; resource projections; appendix which contains data for site and facilities, user facility, science and mathematic education and human resources; and laboratory organization chart.

NONE

1995-12-01T23:59:59.000Z

203

Operating and Assurance Program Plan. Revision 4  

SciTech Connect (OSTI)

The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

Not Available

1994-07-01T23:59:59.000Z

204

Experimental program plan for the Waste Isolation Pilot Plant  

SciTech Connect (OSTI)

The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

Not Available

1994-01-01T23:59:59.000Z

205

Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan  

SciTech Connect (OSTI)

The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

Casey, Leslie A. [DOE/NNSA

2004-09-01T23:59:59.000Z

206

Review of Conservation Costs and Benefits: Five Years of Experience under the Northwest Power Act  

E-Print Network [OSTI]

hours. Research, development and pilot projects have produced savings at costs that range from less than .10 cents to 8.9 cents per kilowatt hour. Based on the results described in this paper, the Northwest Power Planning Council has concluded...

Sheets, E.

207

Undergraduate Mission, Vision, and Plan: Supplements 1 Mission, Vision and Plan: The Undergraduate Program  

E-Print Network [OSTI]

in the ecological sciences, we have experienced. Faculty attrition over the last five years contributes opportunities for in-house internships and undergraduate research. Finally, our current academic environment

208

State Energy Program Helps States Plan  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage » SearchEnergyDepartmentScopingOverview *Agency Recovery Act Program Helps

209

Oil shale program plan, FY 1989  

SciTech Connect (OSTI)

The oil shale program is directed to the development of advanced technologies for extracting shale oil from the large domestic resources. The overall goal is to foster development of an economically competitive and environmentally acceptable oil shale industry. A series of technology development steps must be taken by DOE, other government agencies and other governments and/or industry to achieve this goal. They include basic and applied R and D, proof-of-concept activities, first-of-a-kind field tests and associated commercial-scale activity. Activities associated with the oil shale program are designed to: Expand the technically recoverable resource base, increase recovery efficiency, reduce capital and operating costs and/or enhance environmental acceptability. In support of the overall program goal, oil shale research has two major technical goals: (1) Technology Base Development. To produce an engineering and scientific information base for industry use in designing and developing oil shale processes with reduced costs and enhanced environmental acceptability and to foster the development of novel oil shale processes and, (2) Environmental Mitigation. To develop a comprehensive data base on pollutant generation and the steps required to mitigate the impacts in a cost-effective manner. This report discusses the above goals. 9 refs., 1 fig., 1 tab.

Not Available

1989-06-01T23:59:59.000Z

210

Coal Power Systems strategic multi-year program plans  

SciTech Connect (OSTI)

The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

None

2001-02-01T23:59:59.000Z

211

Savannah River Site Environmental Implementation Plan  

SciTech Connect (OSTI)

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

Not Available

1989-08-01T23:59:59.000Z

212

State Energy Program Strategic Plan: February 2007  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from the GridwiseSiteDepartment of EnergyImpacts State Energy Program2-002State

213

Program Execution Plan Mission Support Organizations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada wins Gerald HahnThomasProgram Booklet/2014

214

1992 Resource Program, 10 Year Plan : Draft II.  

SciTech Connect (OSTI)

The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

215

1992 Resource Program, 10 Year Plan : Draft II.  

SciTech Connect (OSTI)

The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

216

BA Political Science Assessment Plan Program Learning Goals  

E-Print Network [OSTI]

BA Political Science ­ Assessment Plan Program Learning Goals Undergraduate students gain familiarity with American political behavior and institutions, the nature of politics in the rest of the world, and the sources of international conflict and cooperation. All students majoring in political science take

Cantlon, Jessica F.

217

Multistage Stochastic Programming Approach for Offshore Oilfield Infrastructure Planning  

E-Print Network [OSTI]

Multistage Stochastic Programming Approach for Offshore Oilfield Infrastructure Planning under is implemented in the GAMS grid computing environment. Computational results on a variety of oilfield development cycle of a typical offshore oilfield project consists of the following five steps: (1) Exploration

Grossmann, Ignacio E.

218

A Program Plan for Photovoltaic Buildings in Florida  

Broader source: Energy.gov [DOE]

This document outlines plans developed by the Florida Solar Energy Center (FSEC) to support photovoltaic buildings application in the state through the first decade of the 21st century. The emphasis of this program is on identifying and increasing the value of rooftop systems to targeted end users through the use of application experiments.

219

Iraq liquid radioactive waste tanks maintenance and monitoring program plan.  

SciTech Connect (OSTI)

The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad (Iraq Ministry of Science and Technology)

2011-10-01T23:59:59.000Z

220

Technology and Consumer Products Branch: program plan  

SciTech Connect (OSTI)

The primary objective of the Technology and Consumer Products Branch (TCP) is to encourage the development and commercialization of energy-efficient technologies and equipment used in buildings and purchased by consumers. The TCP program conducts technical research, development, and demonstration efforts jointly funded with private industry, educational institutions, utilities, and other Federal and state agencies as appropriate. All contracts, grants, or interagency agreements have the major thrust of developing products and disseminating information that will accelerate commercial availability of energy-efficient, low-cost, reliable technologies, techniques, and products suitable for use by consumers and design professionals in the residential and commercial building sectors. Specifically, the technologies pursued by the branch include heating and cooling systems, consumer appliances, lighting design, and systems. Projects for each of these areas are summarized briefly, and publications resulting from the activities are listed.

None

1980-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Twenty-five years of artificial photosynthesis research at Ernest Orlando Lawrence Berkeley National Laboratory  

SciTech Connect (OSTI)

This report summarizes the research done on artificial photosynthesis by the Calvin Group between 1970 and 1995 when the program was terminated. It contains a compilation of the personnel involved as well as a bibliography of publications supported by the project.

Otvos, J.W.; Calvin, M.

1996-02-01T23:59:59.000Z

222

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

Swedish National Energy Administration ton coal equivalenttCO 2 ) Energy Electricity * bituminous coal Costs areare needed, such as energy price reform (coal, electricity,

Levine, Mark D.

2010-01-01T23:59:59.000Z

223

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

calcium carbide, coking, cement, coal, plate glass, pulp andcarbide 2 Mt Coking 80 Mt Cement 250 Mt Coal mining (

Levine, Mark D.

2010-01-01T23:59:59.000Z

224

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

2000. The Guidebook for Energy Audits, Programme Schemes andAUDIT II - Guidebook for Energy Audit Programme Developers.of the inspection or energy audit are borne by the central

Levine, Mark D.

2010-01-01T23:59:59.000Z

225

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

to the recent increase in coal prices, and together with thesuch as energy price reform (coal, electricity, gasoline,Grid Purchasing Prices from Small Coal-fired Plants. April

Levine, Mark D.

2010-01-01T23:59:59.000Z

226

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

projects of renewable energy in buildings Subsidy forpublic buildings Renewable energy in buildings Figure 9.Renewable Energy Application in Buildings ..

Levine, Mark D.

2010-01-01T23:59:59.000Z

227

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

Summer Study on Energy Efficiency in Buildings. Washington,goals for energy efficiency in buildings, energy-efficientKey Projects Energy Efficiency in Buildings Energy-Efficient

Levine, Mark D.

2010-01-01T23:59:59.000Z

228

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

Add a target for Carbon Intensity ES-2 Monitoring,Add a target for Carbon Intensity Given the government’starget for reduction of carbon intensity (CO 2 emissions per

Levine, Mark D.

2010-01-01T23:59:59.000Z

229

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network [OSTI]

recently. In 2005, total energy consumption reached 2,225unfolds as forecast, total energy consumption in 2010 wouldthereby reducing total energy consumption from 2,833 Mtce to

Lin, Jiang

2008-01-01T23:59:59.000Z

230

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

2006 through 2008, total energy consumption was 45 Mtce, 162FYP period N?A? Total energy consumption to decrease by 20%,Table 7 to derive total energy consumption for buildings. No

Levine, Mark D.

2010-01-01T23:59:59.000Z

231

Taking out one billion tones of carbon: the magic of China's 11th Five-Year Plan  

E-Print Network [OSTI]

recently. In 2005, total energy consumption reached 2,225unfolds as forecast, total energy consumption in 2010 wouldsectors. 10 of 14 Total energy consumption, energy savings

Lin, Jiang; Zhou, Nan; Levine, Mark D.; Fridley, David

2007-01-01T23:59:59.000Z

232

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network [OSTI]

Y. , Yu, C. , Guo, Y. , Sinton, J. , and Lewis, J. and Zhu,Ernst Worrell, Jonathan E. Sinton, and Jiang Yun. 2003. “1998; Volume 19, No. 4 Sinton, J. , Fridley, D. , Lewis,

Lin, Jiang

2008-01-01T23:59:59.000Z

233

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

Price, L. , Galitsky, C. , Sinton, J. , Worrell, E. , Graus,Policy 26 (11):813-829 Sinton J. , Levine M.D. , FridleyBerkeley National Laboratory. Sinton, J. and Fridley, D. ,

Levine, Mark D.

2010-01-01T23:59:59.000Z

234

Taking out one billion tones of carbon: the magic of China's 11th Five-Year Plan  

E-Print Network [OSTI]

Ernst Worrell, Jonathan E. Sinton, and Jiang Yun. 2003. “1998; Volume 19, No. 4 Sinton, J. , Fridley, D. , Lewis,Laboratory, LBNL-55349. Sinton, J. , and Levine, M. ,

Lin, Jiang; Zhou, Nan; Levine, Mark D.; Fridley, David

2007-01-01T23:59:59.000Z

235

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

consumption fuel shares were 36.1% coal, 21.3% crude oil,Crude oil processing kgoe/t Ethylene kgce/t Coal Comprehensive electricity consumptionconsumption) Synthetic ammonia Sodium hydroxide (ionic membrane) Sodium hydroxide (diaphragm) Soda Calcium carbide Crude oil

Levine, Mark D.

2010-01-01T23:59:59.000Z

236

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

televisions, refrigerators and freezers, mobile phones,dishwashers, refrigerators and freezers and clothes washersand 48 million refrigerator/freezers with exports of 20

Levine, Mark D.

2010-01-01T23:59:59.000Z

237

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network [OSTI]

differences in 2010 primary energy consumption among three12 illustrates the primary energy consumption for the BPS,Efficiency Figure 12 Primary energy consumption by sector in

Lin, Jiang

2008-01-01T23:59:59.000Z

238

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

such as the US Residential Energy Consumption Survey (U.S.after the US Residential Energy Consumption Survey (RECS) ortheir energy consumption and expenditures (U.S. EIA, 2008a).

Levine, Mark D.

2010-01-01T23:59:59.000Z

239

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

out an energy audit of 768 buildings and 59 universities,Energy audits were conducted by local energy conservation centers, ESCOs, and universities (

Levine, Mark D.

2010-01-01T23:59:59.000Z

240

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network [OSTI]

as a result, energy use per unit of GDP (energy intensity)a rebound in energy use per unit of GDP after 2001, afterresidual energy use in industry per unit of GDP (economic

Lin, Jiang

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

years if amount of energy per unit GDP remained constant. Inyears if amount of energy per unit GDP remained constant. Inin the amount of energy consumed per unit GDP; on the other

Levine, Mark D.

2010-01-01T23:59:59.000Z

242

Taking out one billion tones of carbon: the magic of China's 11th Five-Year Plan  

E-Print Network [OSTI]

as a result, energy use per unit of GDP (energy intensity) 1a rebound in energy use per unit of GDP after 2001, after

Lin, Jiang; Zhou, Nan; Levine, Mark D.; Fridley, David

2007-01-01T23:59:59.000Z

243

FIVE-YEAR STRATEGIC PLAN 2003-2007 USDA FOREST SERVICE NORTHEAST CENTER FOR URBAN & COMMUNITY FORESTRY  

E-Print Network [OSTI]

FORESTRY United States Department of Agriculture Forest Service Northeastern Area #12;Page 2 D R AFT BACKGROUND AND MISSION The Northeast Center for Urban and Community Forestry was estab- lished in October. The Northeast Center for Urban and Community Forestry responds to urban and community forestry information needs

Schweik, Charles M.

244

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

control systems, and heat supply together • Expand thecan increase 30%. Heat supply efficiency of district heatingrebuild the current heat supply through scattered small

Levine, Mark D.

2010-01-01T23:59:59.000Z

245

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

supply efficiency of district heating is 50% more than thatloads, priority develop district heating, and then developboilers into the district heating. In 2010, popularization

Levine, Mark D.

2010-01-01T23:59:59.000Z

246

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network [OSTI]

boiler boiler stove district heating heat pump conditionerSmall cogen Stove District heating Heat pump Centralized AC

Lin, Jiang

2008-01-01T23:59:59.000Z

247

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

of coal-fired boilers, waste heat and pressure utilization,will amount to 35 Mtce. Waste Heat and Pressure Utilizationto support 136 sub-projects in waste heat and waste pressure

Levine, Mark D.

2010-01-01T23:59:59.000Z

248

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network [OSTI]

into rural and urban locales due to the different energyand rural road transport exhibits very different energyabove: k = energy type m = locale type (urban, rural) P m,i

Lin, Jiang

2008-01-01T23:59:59.000Z

249

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

coal-burning industrial boiler efficiency will increase 52 ) Heating Coal-fired boiler efficiency Cooling (water- COPfired industrial boilers: increase efficiency by 5%, save 25

Levine, Mark D.

2010-01-01T23:59:59.000Z

250

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

clean coal, petroleum coke and natural gas, accelerate transmission of electricity from the western to the eastern region of China

Levine, Mark D.

2010-01-01T23:59:59.000Z

251

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network [OSTI]

Heat Pump Centralized AC by NG Electric water heater Gasheater gas boiler boiler stove district heating heat pump conditioner Air conditioning Lighting Cooking and waterWater heating Technologies Electric heater Gas boiler Boiler Small cogen Stove District heating Heat pump

Lin, Jiang

2008-01-01T23:59:59.000Z

252

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

the level defined for a passive house in Germany (see FigureMinerge Germany Standard Passive House Definition Figure 15.low energy buildings or passive houses. Passive housing is

Levine, Mark D.

2010-01-01T23:59:59.000Z

253

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network [OSTI]

Refrigerator Household Gas Cooker Household Gas Water Heatertelevisions, and rice cookers, common commercial equipmentnow at 94-96%. Household gas cookers, however, remain less

Levine, Mark D.

2010-01-01T23:59:59.000Z

254

Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan  

SciTech Connect (OSTI)

The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

Early, T.O.

1994-05-01T23:59:59.000Z

255

Five-year summary and evaluation of operations and performance of the Utica aquifer and North Lake Basin Wetlands restoration project in 2004-2009.  

SciTech Connect (OSTI)

This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.

LaFreniere, L. M. (Environmental Science Division) [Environmental Science Division

2011-09-13T23:59:59.000Z

256

Proposed resource evaluation plan. Salton Sea scientific drilling program  

SciTech Connect (OSTI)

The report presents a plan for evaluating the deep geothermal resource in the Salton Sea area of Imperial County, California. The plan is divided into two testing programs, followed by the modeling and evaluation of the underground geothermal resource. The testing program related to geological data collection includes acquiring and analyzing the core, running geophysical and temperature/pressure logs in both the deep well and the injection well, and carrying out extensive mud-logging activities. The flow testing program includes temperature, pressure, and flow measurements made in the well and surface facilities. Sampling and analysis of fluid and scale both in the well and at the surface facilities will also be carried out. 6 refs., 7 figs., 7 tabs. (ACR)

Not Available

1985-03-01T23:59:59.000Z

257

Environmental development plan for transportation programs: FY80 update  

SciTech Connect (OSTI)

This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

1980-09-01T23:59:59.000Z

258

Water Power Program: Program Plans, Implementation, and Results  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012NuclearBradleyBudget Water Power Program Budget

259

Energy Department Announces Five-Year Renewal of Funding for Bioenergy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPC ENABLE:2009 DOE Hydrogen13, 2014 YearProgram Funding

260

Multiyear Program Plan for the High Temperature Materials Laboratory  

SciTech Connect (OSTI)

Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.

Arvid E. Pasto

2000-03-17T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

ERD UMTRA Project quality assurance program plan, Revision 7  

SciTech Connect (OSTI)

This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors.

NONE

1995-09-01T23:59:59.000Z

262

Plutonium stabilization and handling quality assurance program plan  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) identifies project quality assurance requirements for all contractors involved in the planning and execution of Hanford Site activities for design, procurement, construction, testing and inspection for Project W-460, Plutonium Stabilization and Handling. The project encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM.

Weiss, E.V.

1998-04-22T23:59:59.000Z

263

SNL/CA Environmental Planning and Ecology Program Annual Report 2007.  

SciTech Connect (OSTI)

The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

Larsen, Barbara L.

2007-02-01T23:59:59.000Z

264

SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.  

SciTech Connect (OSTI)

The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

Larsen, Barbara L.

2005-05-01T23:59:59.000Z

265

Role of Family Satisfaction in Predicting Life Satisfaction Trajectories Over the First Five Years Following Acquired Disability  

E-Print Network [OSTI]

Dissertation by CAITLIN LOUISE HERNÁNDEZ Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY Approved by: Chair of Committee, Timothy Elliott... the First Five Years Following Acquired Disability. (August 2012) Caitlin Louise Hernández, B.A., Nebraska Wesleyan University; M.S., Texas A&M University Chair of Advisory Committee: Dr. Timothy R. Elliott This study aimed to model the trajectories...

Herna?ndez, Caitlin Louise

2012-10-19T23:59:59.000Z

266

Lessons from five years of vegetation monitoring on the Nevada Test Site  

SciTech Connect (OSTI)

In 1987 the US Department of Energy funded a formal, extensive monitoring program for the flora and fauna on the Nevada Test Site. The goal was to understand and record changes with time In the distribution and abundance of the plants and animals. The need to detect changes, rather than do a one-time characterization, required careful selection of parameters and the use of permanent plots to distinguish spatial from temporal variability. Repeated measurements of the same plots revealed errors and imprecision which required changes in training and data collection techniques. Interpretation of trends after several years suggested it will be important to monitor not only changes, but causes of change, such as soil moisture and herbivory. Finally, the requirement for records to be available over long periods of time poses problems of archiving and publication. This report consists of viewgraphs presenting the findings of the study.

Hunter, R.B.

1992-10-01T23:59:59.000Z

267

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

Washington TRU Solutions

2002-09-24T23:59:59.000Z

268

UMTRA Project Office quality assurance program plan. Revision 6  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors.

Not Available

1994-09-01T23:59:59.000Z

269

Quality assurance program plan for cesium legacy project  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents.

Tanke, J.M.

1997-05-22T23:59:59.000Z

270

Report of the Integrated Program Planning Activity for the DOE Fusion Energy Sciences Program  

SciTech Connect (OSTI)

This report of the Integrated Program Planning Activity (IPPA) has been prepared in response to a recommendation by the Secretary of Energy Advisory Board that, ''Given the complex nature of the fusion effort, an integrated program planning process is an absolute necessity.'' We, therefore, undertook this activity in order to integrate the various elements of the program, to improve communication and performance accountability across the program, and to show the inter-connectedness and inter-dependency of the diverse parts of the national fusion energy sciences program. This report is based on the September 1999 Fusion Energy Sciences Advisory Committee's (FESAC) report ''Priorities and Balance within the Fusion Energy Sciences Program''. In its December 5,2000, letter to the Director of the Office of Science, the FESAC has reaffirmed the validity of the September 1999 report and stated that the IPPA presents a framework and process to guide the achievement of the 5-year goals listed in the 1999 report. The National Research Council's (NRC) Fusion Assessment Committee draft final report ''An Assessment of the Department of Energy's Office of Fusion Energy Sciences Program'', reviewing the quality of the science in the program, was made available after the IPPA report had been completed. The IPPA report is, nevertheless, consistent with the recommendations in the NRC report. In addition to program goals and the related 5-year, 10-year, and 15-year objectives, this report elaborates on the scientific issues associated with each of these objectives. The report also makes clear the relationships among the various program elements, and cites these relationships as the reason why integrated program planning is essential. In particular, while focusing on the science conducted by the program, the report addresses the important balances between the science and energy goals of the program, between the MFE and IFE approaches, and between the domestic and international aspects of the program. The report also outlines a process for establishing a database for the fusion research program that will indicate how each research element fits into the overall program. This database will also include near-term milestones associated with each research element, and will facilitate assessments of the balance within the program at different levels. The Office of Fusion Energy Sciences plans to begin assembling and using the database in the Spring of 2001 as we receive proposals from our laboratories and begin to prepare our budget proposal for Fiscal Year 2003.

None

2000-12-01T23:59:59.000Z

271

Quality Assurance Program Plan for AGR Fuel Development and Qualification Program  

SciTech Connect (OSTI)

Quality Assurance Plan (QPP) is to document the Idaho National Engineering and Environmental Laboratory (INEEL) Management and Operating (M&O) Contractor’s quality assurance program for AGR Fuel Development and Qualification activities, which is under the control of the INEEL. The QPP is an integral part of the Gen IV Program Execution Plan (PEP) and establishes the set of management controls for those systems, structures and components (SSCs) and related quality affecting activities, necessary to provide adequate confidence that items will perform satisfactorily in service.

W. Ken Sowder

2004-02-01T23:59:59.000Z

272

Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2  

SciTech Connect (OSTI)

The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

Not Available

1993-12-01T23:59:59.000Z

273

Atmospheric Radiation Measurement Program Science Plan Current Status and Future Directions of the ARM Science Program  

SciTech Connect (OSTI)

The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative transfer, aerosol science, determination of cloud properties, cloud modeling, and cloud parameterization testing and development. The focus of ARM science has naturally shifted during the last few years to an increasing emphasis on modeling and parameterization studies to take advantage of the long time series of data now available. During the next 5 years, the principal focus of the ARM science program will be to: • Maintain the data record at the fixed ARM sites for at least the next five years. • Improve significantly our understanding of and ability to parameterize the 3-D cloud-radiation problem at scales from the local atmospheric column to the global climate model (GCM) grid square. • Continue developing techniques to retrieve the properties of all clouds, with a special focus on ice clouds and mixed-phase clouds. • Develop a focused research effort on the indirect aerosol problem that spans observations, physical models, and climate model parameterizations. • Implement and evaluate an operational methodology to calculate broad-band heating rates in the atmospheric columns at the ARM sites. • Develop and implement methodologies to use ARM data more effectively to test atmospheric models, both at the cloud-resolving model scale and the GCM scale. • Use these methodologies to diagnose cloud parameterization performance and then refine these parameterizations to improve the accuracy of climate model simulations. In addition, the ARM Program is actively developing a new ARM Mobile Facility (AMF) that will be available for short deployments (several months to a year or more) in climatically important regions. The AMF will have much of the same instrumentation as the remote facilities at ARM’s Tropical Western Pacific and the North Slope of Alaska sites. Over time, this new facility will extend ARM science to a much broader range of conditions for model testing.

TP Ackerman; AD Del Genio; RG Ellingson; RA Ferrare; SA Klein; GM McFarquhar; PJ Lamb; CN Long; J Verlinde

2004-10-30T23:59:59.000Z

274

Risk communications and the Chemical Stockpile Emergency-Planning Program  

SciTech Connect (OSTI)

The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

Vogt, B.M.; Sorensen, J.H.

1994-09-01T23:59:59.000Z

275

Tank waste remediation system vadose zone program plan  

SciTech Connect (OSTI)

The objective of the vadose zone characterization under this program is to develop a better conceptual geohydrologic model of identified tank farms which will be characterized so that threats to human health and the environment from past leaks and spills, intentional liquid discharges, potential future leaks during retrieval, and from residual contaminants that may remain in tank farms at closure can be explicitly addressed in decision processes. This model will include geologic, hydrologic, and hydrochemical parameters as defined by the requirements of each of the TWRS programs identified here. The intent of this TWRS Vadose Zone Program Plan is to provide justification and an implementation plan for the following activities: Develop a sufficient understanding of subsurface conditions and transport processes to support decisions on management, cleanup, and containment of past leaks, spills, and intentional liquid discharges; Develop a sufficient understanding of transport processes to support decisions on controlling potential retrieval leaks; Develop a sufficient understanding of transport processes to support decisions on tank farm closure, including allowable residual waste that may remain at closure; and Provide new information on geotechnical properties in the 200 Area to supplement data used for design and performance assessment for immobilized low-activity waste disposal facilities.

Fredenburg, E.A.

1998-07-27T23:59:59.000Z

276

Y-12 Site environmental protection program implementation plan (EPPIP)  

SciTech Connect (OSTI)

The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

NONE

1996-11-01T23:59:59.000Z

277

Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999  

SciTech Connect (OSTI)

DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

Not Available

1993-12-01T23:59:59.000Z

278

Westinghouse Hanford Company quality assurance program and implementation plan  

SciTech Connect (OSTI)

This is the first revision of the Quality AssurancePlan/Implementation Plan (QAP/IP) for nuclear facilities managedand operated by the Westinghouse Hanford Company (WHC).Development of the initial IP required review of the WHC qualityassurance program to the requirements of the 10 CFR 830.120, andcompletion of initial baseline assessments against the QAP toverify implementation of the program. Each WHC-managed nuclearfacility provided a stand-alone section to the QAP/IP, describingits mission and life-cycle status. WHC support organizationsalso performed assessments for their lead areas, and providedinputs to a separate stand-alone section with the initialbaseline assessment results. In this first revision, the initialbaseline matrixes for those facilities found to be in compliancewith the QAP have been removed. Tank Waste Remediation System(TWRS) and K Basins have modified their baseline matrixes to showcompletion of action items to date. With the followingexceptions, the WHC-managed nuclear facilities and their supportorganizations were found to have implemented QA programs thatsatisfy the requirements of 10 CFR 830.120. TWRS identifiedImplementation Plan Action Items having to do with: generationand revision of as-built drawings; updating TWRS organizationaland program documents; tracking the condition/age ofmaterials/equipment; and reconstitution of design bases forexisting, active facilities. No incremental funding needs wereidentified for FY95. For FY97, TWRS identified incrementalfunding in the amount of $65,000 for as-built drawings, and$100,000 for tracking the age/condition of materials/equipment.The K Basin Fuel Storage Facility identified Implementation PlanAction Items having to do with: training; updating procedures;establishing configuration management; reconstituting designbases; and providing darwings; and developing integrated,resource-loaded schedules. Incremental funding needs in theamount of $1.7 million were identified, over a time periodthrough March 1996, to implement the actions. The costs were allassociated with the actions on training ($300K) and configurationmanagement, design bases, and drawings ($1.4M). Schedulardetails and compensatory measures for the action items areprovided in Appendices A and D to this document.

Moss, S.S., Westinghouse Hanford

1996-07-01T23:59:59.000Z

279

Program Plans, Implementation, and Results | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataCombinedDepartment of Energy 2:52pm Addthis InAbout » Program Plans,

280

The Marshall Plan: History's Most Successful Structural Adjustment Program  

E-Print Network [OSTI]

1972). Bureaucracy, the Marshall Plan, and the NationalHogan, Michael (1987). The Marshall Plan: America, Britain,Kindleberger, Charles (1987), Marshall Plan Days Kostrzewa,

DeLong, J. Bradford; Eichengreen, Barry

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Next Generation Nuclear Plant Methods Technical Program Plan  

SciTech Connect (OSTI)

One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

2007-01-01T23:59:59.000Z

282

Next Generation Nuclear Plant Methods Technical Program Plan  

SciTech Connect (OSTI)

One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

2010-12-01T23:59:59.000Z

283

Next Generation Nuclear Plant Methods Technical Program Plan -- PLN-2498  

SciTech Connect (OSTI)

One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

2010-09-01T23:59:59.000Z

284

Twenty-Five Years of Ecological Recovery of East Fork Poplar Creek: Review of Environmental Problems and Remedial Actions  

SciTech Connect (OSTI)

In May 1985, a National Pollutant Discharge Elimination System permit was issued for the Department of Energy s Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee, USA, allowing discharge of effluents to East Fork Poplar Creek (EFPC). The effluents ranged from large volumes of chlorinated oncethrough cooling water and cooling tower blow-down to smaller discharges of treated and untreated process wastewaters, which contained a mixture of heavy metals, organics, and nutrients, especially nitrates. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to meet two major objectives: demonstrate that the established effluent limitations were protecting the classified uses of EFPC, and document the ecological effects resulting from implementing a Water Pollution Control Program at the Y-12 Complex. The second objective is the primary focus of the other papers in this special series. This paper provides a history of pollution and the remedial actions that were implemented; describes the geographic setting of the study area; and characterizes the physicochemical attributes of the sampling sites, including changes in stream flow and temperature that occurred during implementation of the BMAP. Most of the actions taken under the Water Pollution Control Program were completed between 1986 and 1998, with as many as four years elapsing between some of the most significant actions. The Water Pollution Control Program included constructing nine new wastewater treatment facilities and implementation of several other pollution-reducing measures, such as a best management practices plan; area-source pollution control management; and various spill-prevention projects. Many of the major actions had readily discernable effects on the chemical and physical conditions of EFPC. As controls on effluents entering the stream were implemented, pollutant concentrations generally declined and, at least initially, the volume of water discharged from the Y-12 Complex declined. This reduction in discharge was of ecological concern and led to implementation of a flow management program for EFPC. Implementing flow management, in turn, led to substantial changes in chemical and physical conditions of the stream: stream discharge nearly doubled and stream temperatures decreased, becoming more similar to those in reference streams. While water quality clearly improved, meeting water quality standards alone does not guarantee protection of a waterbody s biological integrity. Results from studies on the ecological changes stemming from pollution-reduction actions, such as those presented in this series, also are needed to understand how best to restore or protect biological integrity and enhance ecological recovery in stream ecosystems. With a better knowledge of the ecological consequences of their decisions, environmental managers can better evaluate alternative actions and more accurately predict their effects.

Smith, John G [ORNL; Loar, James M [ORNL; Stewart, Arthur J [ORNL

2011-01-01T23:59:59.000Z

285

National Ignition Facility Quality Assurance Program Plan. Revision 1  

SciTech Connect (OSTI)

The National Ignition Facility (NIF) is a key constituent of the Department of Energy`s Stockpile Stewardship Program. The NIF will use inertial confinement fusion (ICF) to produce ignition and energy gain in ICF targets, and will perform weapons physics and high-energy- density experiments in support of national security and civilian objectives. The NIF Project is a national facility involving the collaboration of several DOE laboratories and subcontractors, including Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), and the University of Rochester Laboratory for Laser Energetics (UR/LLE). The primary mission of the NIF Project is the construction and start-up operation of laser-based facilities that will demonstrate fusion ignition in the laboratory to provide nuclear-weapons-related physics data, and secondarily, to propagate fusion burn aimed at developing a potential source of civilian energy. To support the accomplishment of this very important mission, the LLNL Laser Directorate created the NIF Project Office to organize and bring about the Project. The NIF Project Office has established this Quality Assurance Program to ensure its success. This issue of the Quality Assurance Program Plan (QAPP) adds the requirements for the conduct of Title 11 design, construction, procurement, and Title III engineering. This QAPP defines and describes the program-the management system-for specifying, achieving, and assuring the quality of all NIF Project work consistent with the policies of the Laboratory and the Laser Directorate.

Wolfe, C.R.; Yatabe, J.

1996-09-01T23:59:59.000Z

286

UMTRA Project Office Quality Assurance Program Plan. Revision 5  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office directs the overall Project. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA Project Office shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan or an industry standard format that has been approved by the DOE Project Office.

Not Available

1993-11-01T23:59:59.000Z

287

Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for headspace gases distributes blind audit samples in a gas matrix for analysis of volatile organic compounds (VOCs). Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement facilities must analyze PDP samples using the same procedures used for routine waste characterization analyses of WIPP samples.

Carlsbad Field Office

2007-11-19T23:59:59.000Z

288

Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for headspace gases distributes blind audit samples in a gas matrix for analysis of volatile organic compounds (VOCs). Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement facilities must analyze PDP samples using the same procedures used for routine waste characterization analyses of WIPP samples.

Carlsbad Field Office

2007-11-13T23:59:59.000Z

289

Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for headspace gases distributes sample gases of volatile organic compounds (VOCs) for analysis. Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement facilities must analyze PDP samples using the same procedures used for routine waste characterization analyses of WIPP samples.

Carlsbad Field Office

2006-04-01T23:59:59.000Z

290

National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006  

SciTech Connect (OSTI)

The U.S. Department of Energy's (DOE's) Weatherization Assistance Program was created by Congress in 1976 under Title IV of the Energy Conservation and Production Act. The purpose and scope of the Program as currently stated in the Code of Federal Regulations (CFR) 10CFR 440.1 is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, persons with disabilities, families with children, high residential energy users, and households with high energy burden' (Code of Federal Regulations, 2005). DOE sponsored a comprehensive evaluation of the Program in the early 1990's to provide policy makers and program implementers with up-to-date and reliable information they needed for effective decision making and cost-effective operations. Oak Ridge National Laboratory (ORNL) managed the five part study which was based primarily on data from Program Year (PY) 1989 and supplemented by data from 1991-92 (Brown, Berry, and Kinney, 1994). In more recent years, ORNL has conducted four metaevaluations of the Program's energy savings using studies conducted by individual states between the years 1990-1996 (Berry, 1997), 1996-1998 (Schweitzer and Berry, 1999), 1993-2002 (Berry and Schweitzer, 2003), and 1993-2005 (Schweitzer, 2005). DOE announced through its Weatherization Program Notice 05-1 (DOE, 2004) that it would undertake a new national evaluation of the Program because the Program that was evaluated comprehensively in the early 1990's is vastly different from the Program of today. The Program has incorporated new funding sources, management principles, audit procedures, and energy-efficiency measures in response to findings and recommendations resulting from the 1989 National Evaluation, the Weatherization Plus strategic planning process, and other federal, state, and local initiatives. For example, the use of computerized audits has increased, cooling and baseload measures have been added, weatherization approaches tailored to the unique construction characteristics of mobile homes have been developed, the weatherization of large multifamily buildings has expanded and become more sophisticated, the flexibility to improve 'energy-related' health and safety has been provided, and leveraging with utilities, other state programs, and owners of large multifamily buildings has increased considerably. The Department of Energy tasked ORNL with planning the new evaluation in light of its experience in conducting the previous national evaluation and the metaevaluations. This preliminary evaluation plan, developed by ORNL, documents how the new national evaluation will be performed. In the remaining portion of this section, the purpose and fundamental questions the evaluation will address are identified and how these questions were derived is discussed.

Ternes, Mark P [ORNL; Schweitzer, Martin [ORNL; Tonn, Bruce Edward [ORNL; Schmoyer, Richard L [ORNL; Eisenberg, Joel Fred [ORNL

2007-02-01T23:59:59.000Z

291

Budget FY 1995 site support program plan WBS 6.10.1  

SciTech Connect (OSTI)

This is the program plan of Budget for the fiscal year 1995 site support. The topics of the program plan include a general mission statement, the primary customers, major activities performed to deliver products and services, program priorities, goals and objectives, assumptions, issues and constraints, performance measures, work breakdown structure and responsibility assignment matrix, description of activities and milestone list.

Wemhoff, G.M.

1994-09-01T23:59:59.000Z

292

Transportation Emergency Preparedness Program Plan, U.S. Department of Energy Region 6  

SciTech Connect (OSTI)

The United States Department of Energy (DOE) Region 6 Transportation Emergency Preparedness Program Plan (TEPP Plan) operates within the framework of the DOE emergency management system for developing, coordinating, and directing emergency planning, preparedness, and readiness assurance activities for radiological transportation incidents. The DOE Region 6 TEPP Plan is a narrative description of the DOE Transportation Emergency Preparedness Program activities, training and technical assistance provided to states and tribes along DOE's transportation corridors in DOE Region 6.

Marsha Keister

2010-04-01T23:59:59.000Z

293

Quality Assurance Program Plan for TRUPACT-II Gas Generation Test Program  

SciTech Connect (OSTI)

The Gas Generation Test Program (GGTP), referred to as the Program, is designed to establish the concentration of flammable gases and/or gas generation rates in a test category waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II). The phrase "gas generationtesting" shall refer to any activity that establishes the flammable gas concentration or the flammable gas generation rate. This includes, but is not limited to, measurements performed directly on waste containers or during tests performed on waste containers. This Quality Assurance Program Plan (QAPP) documents the quality assurance (QA) and quality control (QC) requirements that apply to the Program. The TRUPACT-II requirements and technical bases for allowable flammable gas concentration and gas generation rates are described in the TRUPACT-II Authorized Methods for Payload Control (TRAMPAC).

Carlsbad Field Office

2002-03-01T23:59:59.000Z

294

Program plan for the resolution of tank vapor issues  

SciTech Connect (OSTI)

Since 1987, workers at the Hanford Site waste tank farms in Richland, Washington, have reported strong odors emanating from the large, underground high-level radioactive waste storage tanks. Some of these workers have complained of symptoms (e.g., headaches, nausea) related to the odors. In 1992, the U.S. Department of Energy, which manages the Hanford Site, and Westinghouse Hanford Company determined that the vapor emissions coming from the tanks had not been adequately characterized and represented a potential health risk to workers in the immediate vicinity of the tanks. At that time, workers in certain areas of the tank farms were required to use full-face, supplied-breathing-air masks to reduce their exposure to the fugitive emissions. While use of supplied breathing air reduced the health risks associated with the fugitive emissions, it introduced other health and safety risks (e.g., reduced field of vision, air-line tripping hazards, and heat stress). In 1992, an aggressive program was established to assure proper worker protection while reducing the use of supplied breathing air. This program focuses on characterization of vapors inside the tanks and industrial hygiene monitoring in the tank farms. If chemical filtration systems for mitigation of fugitive emissions are deemed necessary, the program will also oversee their design and installation. This document presents the plans for and approach to resolving the Hanford Site high-level waste tank vapor concerns. It is sponsored by the Department of Energy Office of Environmental Restoration and Waste Management.

Osborne, J.W.; Huckaby, J.L.

1994-05-01T23:59:59.000Z

295

Proceedings of the flexible, midsize gas turbine program planning workshop  

SciTech Connect (OSTI)

The US Department of Energy (DOE) and the California Energy Commission (CEC) held a program planning workshop on March 4--5, 1997 in Sacramento, California on the subject of a flexible, midsize gas turbine (FMGT). The workshop was also co-sponsored by the Electric Power Research Institute (EPRI), the Gas Research Institute (GRI), the Gas Turbine Association (GTA), and the Collaborative Advanced Gas Turbine Program (CAGT). The purpose of the workshop was to bring together a broad cross section of knowledgeable people to discuss the potential benefits, markets, technical attributes, development costs, and development funding approaches associated with making this new technology available in the commercial marketplace. The participants in the workshop included representatives from the sponsoring organizations, electric utilities, gas utilities, independent power producers, gas turbine manufacturers, gas turbine packagers, and consultants knowledgeable in the power generation field. Thirteen presentations were given on the technical and commercial aspects of the subject, followed by informal breakout sessions that dealt with sets of questions on markets, technology requirements, funding sources and cost sharing, and links to other programs.

NONE

1997-03-01T23:59:59.000Z

296

Quality Assurance Program Plan (QAPP) Waste Management Project  

SciTech Connect (OSTI)

This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

VOLKMAN, D.D.

1999-10-27T23:59:59.000Z

297

Building system integration research: recommendations for a US Department of Energy multiyear program plan  

SciTech Connect (OSTI)

This plan describes the scope, technical content, and resources required to conduct the Building System Integration (BSI) research program during FY 1987 through 1991. System integration research is defined, the need for the research is discussed, its benefits are outlined, and the history of building system integration research is summarized. The program scope, the general approach taken in developing this program plan, and the plan's contents are also described.

Not Available

1986-01-01T23:59:59.000Z

298

Seismic Safety Margins Research Program: Phase II program plan (FY 83-FY 84)  

SciTech Connect (OSTI)

The Seismic Safety Margins Research Program (SSMRP) is an NRC-funded, multiyear program conducted by Lawrence Livermore National Laboratory (LLNL). Its goal is to develop a complete, fully coupled analysis procedure (including methods and computer codes) for estimating the risk of an earthquake-caused radioactive release from a commercial nuclear power plant. The analysis procedure is based upon a state-of-the-art evaluation of the current seismic analysis and design process and explicitly includes the uncertainties inherent in such a process. The results will be used to improve seismic licensing requirements for nuclear power plants. As currently planned, the SSMRP will be completed in September, 1984. This document presents the program plan for work to be done during the remainder of the program. In Phase I of the SSMRP, the necessary tools (both computer codes and data bases) for performing a detailed seismic risk analysis were identified and developed. Demonstration calculations were performed on the Zion Nuclear Power Plant. In the remainder of the program (Phase II) work will be concentrated on developing a simplified SSMRP methodology for routine probabilistic risk assessments, quantitative validation of the tools developed and application of the simplified methodology to a Boiling Water Reactor. (The Zion plant is a pressurized water reactor.) In addition, considerable effort will be devoted to making the codes and data bases easily accessible to the public.

Bohn, M.P.; Bernreuter, D.L.; Cover, L.E.; Johnson, J.J.; Shieh, L.C.; Shukla, S.N.; Wells, J.E.

1982-08-02T23:59:59.000Z

299

SSL Pricing and Efficacy Trend Analysis for Utility Program Planning  

SciTech Connect (OSTI)

An LED lamp or luminaire can generally be found that matches or exceeds the efficacy of benchmark technologies in a given product category, and LED products continue to expand into ever-higher lumen output niches. However, the price premium for LED continues to pose a barrier to adoption in many applications, in spite of expected savings from reduced energy use and maintenance. Other factors—such as dimmability and quality of light—can also present challenges. The appropriate type, timing, and magnitude of energy efficiency activities will vary from organization to organization based on local variables and the method of evaluation. A number of factors merit consideration when prioritizing activities for development. Category-specific projections for pricing and efficacy are provided herein to assist in efficiency program planning efforts.

Tuenge, Jason R.

2013-10-01T23:59:59.000Z

300

Management and overview Quality Assurance Program Plan. Revision 2  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

Not Available

1986-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Next Generation Nuclear Plant Research and Development Program Plan  

SciTech Connect (OSTI)

The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission Demonstrate safe and economical nuclearassisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: High temperature gas reactor fuels behavior High temperature materials qualification Design methods development and validation Hydrogen production technologies Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen production [DOE 2004] and energy conversion technologies programs are described elsewhere.

P. E. MacDonald

2005-01-01T23:59:59.000Z

302

Next Generation Nuclear Plant Research and Development Program Plan  

SciTech Connect (OSTI)

The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: (1) Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission (2) Demonstrate safe and economical nuclear-assisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: (1) High temperature gas reactor fuels behavior; (2) High temperature materials qualification; (3) Design methods development and validation; (4) Hydrogen production technologies; and (5) Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen production [DOE 2004] and energy conversion technologies programs are described elsewhere.

None

2005-01-01T23:59:59.000Z

303

BA Economics and BA Financial Economics Assessment Plan Program Learning Objectives  

E-Print Network [OSTI]

BA Economics and BA Financial Economics ­ Assessment Plan Program Learning Objectives The program will prepare graduates: 1. Understand the "economic way model economic decisions. 3. The ability to analyze historical and current events

Cantlon, Jessica F.

304

Radiological Assistance Program, DOE Region 6 response plan  

SciTech Connect (OSTI)

This program plan meets all the requirements identified in DOE Order 5530.3, Radiological Assistance Program and supports those requirements leading to the establishment of a Federal Radiological Monitoring and Assessment Center (FRMAC) as required by DOE 5530-5. Requests for radiological assistance may come from other DOE facilities, Federal or state agencies, tribal officials, or from any private corporation or individual. Many of the requests will be handled by a telephone call, a conference or a letter, teletype or memorandum. Other requests for assistance may involve radioactive material in serious accidents, fire, personal injuries, contamination or possible hazards to the general public. Some occurrences may require the dispatch of trained personnel equipped with radiation monitoring instruments and related equipment necessary to evaluate, control and neutralize the hazard. The primary responsibility for incidents involving radioactive material always remains with the party having custody of the radioactive materials. In addition, the DOE recognizes that the assistance provided shall not in any way preempt state, tribal, or local authority and/or responsibility on state or tribal properties. Toward this end, DOE assistance for non-DOE radioactive materials, is limited to technical assistance, advice, measurement and other resources as deemed necessary by the local authorities but excludes DOE interface with the public media. This is a function handled by the local or state Incident Commander.

Jakubowski, F.M.

1993-02-01T23:59:59.000Z

305

Materials Issues for Micromachines Development - ASCI Program Plan  

SciTech Connect (OSTI)

This report summarizes materials issues associated with advanced micromachines development at Sandia. The intent of this report is to provide a perspective on the scope of the issues and suggest future technical directions, with a focus on computational materials science. Materials issues in surface micromachining (SMM), Lithographic-Galvanoformung-Abformung (LIGA: lithography, electrodeposition, and molding), and meso-machining technologies were identified. Each individual issue was assessed in four categories: degree of basic understanding; amount of existing experimental data capability of existing models; and, based on the perspective of component developers, the importance of the issue to be resolved. Three broad requirements for micromachines emerged from this process. They are: (1) tribological behavior, including stiction, friction, wear, and the use of surface treatments to control these, (2) mechanical behavior at microscale, including elasticity, plasticity, and the effect of microstructural features on mechanical strength, and (3) degradation of tribological and mechanical properties in normal (including aging), abnormal and hostile environments. Resolving all the identified critical issues requires a significant cooperative and complementary effort between computational and experimental programs. The breadth of this work is greater than any single program is likely to support. This report should serve as a guide to plan micromachines development at Sandia.

FANG,HUEI ELIOT; BATTAILE,CORBETT C.; BENAVIDES,GILBERT L.; ENSZ,MARK T.; BUCHHEIT,THOMAS E.; LAVAN,DAVID A.; CHEN,ER-PING; CHRISTENSON,TODD R.; DE BOER,MAARTEN P.; MILLER,SAMUEL L.; DUGGER,MICHAEL T.; PRASAD,SOMURI V.; REEDY JR.,EARL DAVID; THOMPSON,AIDAN P.; WONG,CHUNGNIN C.; YANG,PIN

2000-05-01T23:59:59.000Z

306

Landlord Program multi-year program plan fiscal year 1995 WBS 7.5  

SciTech Connect (OSTI)

The Landlord Program mission is to maintain, preserve, or upgrade the strategic assets of the Hanford Site to meet the overall cleanup mission. This encompasses innovative, appropriate, and cost effective general purpose infrastructure support, services, and long range strategic site planning that is the foundation for seven major Hanford programs. These programs are (1) Environmental Restoration, (2) Tank Waste Remediation System, (3) Solid/Liquid Waste Decontamination, (4) Facility Transition, (5) Spent Fuel, (6) Technology Development, and (7) the Multi-Program Laboratory. General infrastructure support consists of facilities, systems, and equipment that by design or use are not essentially dedicated to a single program mission. Facilities include laboratories, shops, warehouses, and general work space. Systems include electrical, process sewers, rail, roads, telecommunications, water, fire and emergency response, and steam supply and distribution. Funding also supports capital equipment critical to maintaining, upgrading, or operating the general infrastructure. Paramount to these objectives is compliance with all applicable laws, orders, agreements, codes, standards, best management and safety practices. The objectives for general infrastructure support are reflected in five programmatic functions, (1) Program Integration, (2) Capital Equipment, (3) Expense Funded Projects, (4) General Plant Projects, and (5) Line Items.

Young, C.L.

1994-09-26T23:59:59.000Z

307

Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase  

SciTech Connect (OSTI)

The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operator performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to serve as a template for other utilities’ projects for control room modernization.

Jacques Hugo; Ronald Boring; Lew Hanes; Kenneth Thomas

2013-09-01T23:59:59.000Z

308

General Counsel`s Office FY 1996 Site Support Program Plan: WBS 6.10.5. Revision 1  

SciTech Connect (OSTI)

This is the General Counsel`s Office site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, description of activities, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail.

Moreno, S.R.

1995-09-01T23:59:59.000Z

309

Next Generation Nuclear Plant Materials Research and Development Program Plan  

SciTech Connect (OSTI)

The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R&D Program includes the following elements: (1) Developing a specific approach, program plan and other project management tools for managing the R&D program elements; (2) Developing a specific work package for the R&D activities to be performed during each government fiscal year; (3) Reporting the status and progress of the work based on committed deliverables and milestones; (4) Developing collaboration in areas of materials R&D of benefit to the NGNP with countries that are a part of the Generation IV International Forum; and (5) Ensuring that the R&D work performed in support of the materials program is in conformance with established Quality Assurance and procurement requirements. The objective of the NGNP Materials R&D Program is to provide the essential materials R&D needed to support the design and licensing of the reactor and balance of plant, excluding the hydrogen plant. The materials R&D program is being initiated prior to the design effort to ensure that materials R&D activities are initiated early enough to support the design process and support the Project Integrator. The thermal, environmental, and service life conditions of the NGNP will make selection and qualification of some high-temperature materials a significant challenge; thus, new materials and approaches may be required.

G.O. Hayner; R.L. Bratton; R.N. Wright

2005-09-01T23:59:59.000Z

310

Uranium Mill Tailings remedial action project waste minimization and pollution prevention awareness program plan  

SciTech Connect (OSTI)

The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases.

Not Available

1994-07-01T23:59:59.000Z

311

Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program  

SciTech Connect (OSTI)

The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

Not Available

1993-07-01T23:59:59.000Z

312

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR §264.90 through §264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] §6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

Washington Regulatory and Environmental Services

2005-07-01T23:59:59.000Z

313

Fire Protection Program fiscal year 1996, site support program plan Hanford Fire Department. Revision 2  

SciTech Connect (OSTI)

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report gives a program overview, technical program baselines, and cost and schedule baseline.

Good, D.E.

1995-09-01T23:59:59.000Z

314

Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines  

SciTech Connect (OSTI)

This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE`s ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

Not Available

1992-08-01T23:59:59.000Z

315

Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines  

SciTech Connect (OSTI)

This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE's ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

Not Available

1992-08-01T23:59:59.000Z

316

(Environmental impact assessment as applied to policies, plans and programs)  

SciTech Connect (OSTI)

A proposal to study the application of the principles of environmental impact assessment (EIA) to policy, plans, and programs was submitted by the US Environmental Protection Agency (EPA) to the Senior Advisors on Environmental and Water Problems of the United Nations Economic Commission. On approval, EPA asked Oak Ridge National Laboratory (ORNL) to support its efforts as lead participant on an international task force. ORNL is responsible for overall project management, including development of the report. At the first meeting in Geneva on June 18--19, there were representatives from Austria, Canada, Finland, Norway, Poland, Sweden, and the United Kingdom. The administrative/legal setting for EIA in each country was reviewed. The objectives of the task force were defined, and issues related to the application of EIA at the policy level were discussed. At the second meeting, in addition to those countries represented at the first meeting the Commission of Economic Communities, Czech and Slovak Federal Republic, Remark, Federal Republic of Germany, Hungary, and The Netherlands were represented. A brief review was given by the new participants of legal/administrative requirements for EIA in their countries. Case studies were presented by Canada, Finland, The Netherlands, Norway, Sweden, and the United States.

Sigal, L.L.

1990-10-19T23:59:59.000Z

317

EIS-0182: Western Area Power Administration Energy Planning and Management Program  

Broader source: Energy.gov [DOE]

The Western Area Power Administration (WAPA) prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish an Energy Planning and Management Program to replace its Guidelines and Acceptance Criteria for the Conservation and Renewable Energy Program and to evaluate ways to make future resource commitments to existing customers. If adopted, the proposed management program would require WAPA's long-term firm customers to implement long-term energy planning to help enhance efficient electric energy use.

318

Prone Accelerated Partial Breast Irradiation After Breast-Conserving Surgery: Five-year Results of 100 Patients  

SciTech Connect (OSTI)

Purpose: To report the 5-year results of a prospective trial of three-dimensional conformal external beam radiotherapy (3D-CRT) to deliver accelerated partial breast irradiation in the prone position. Methods and Materials: Postmenopausal patients with Stage I breast cancer with nonpalpable tumors <2 cm, negative margins and negative nodes, positive hormone receptors, and no extensive intraductal component were eligible. The trial was offered only after eligible patients had refused to undergo standard whole-breast radiotherapy. Patients were simulated and treated on a dedicated table for prone setup. 3D-CRT was delivered at a dose of 30 Gy in five 6-Gy/day fractions over 10 days with port film verification at each treatment. Rates of ipsilateral breast failure, ipsilateral nodal failure, contralateral breast failure, and distant failure were estimated using the cumulative incidence method. Rates of disease-free, overall, and cancer-specific survival were recorded. Results: One hundred patients were enrolled in this institutional review board-approved prospective trial, one with bilateral breast cancer. One patient withdrew consent after simulation, and another patient elected to interrupt radiotherapy after receiving two treatments. Ninety-eight patients were evaluable for toxicity, and, in 1 case, both breasts were treated with partial breast irradiation. Median patient age was 68 years (range, 53-88 years); in 55% of patients the tumor size was <1 cm. All patients had hormone receptor-positive cancers: 87% of patients underwent adjuvant antihormone therapy. At a median follow-up of 64 months (range, 2-125 months), there was one local recurrence (1% ipsilateral breast failure) and one contralateral breast cancer (1% contralateral breast failure). There were no deaths due to breast cancer by 5 years. Grade 3 late toxicities occurred in 2 patients (one breast edema, one transient breast pain). Cosmesis was rated good/excellent in 89% of patients with at least 36 months follow-up. Conclusions: Five-year efficacy and toxicity of 3D-CRT delivered in prone partial breast irradiation are comparable to other experiences with similar follow-up.

Formenti, Silvia C., E-mail: silvia.formenti@nyumc.org [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States); Hsu, Howard; Fenton-Kerimian, Maria [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States)] [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States); Roses, Daniel; Guth, Amber [Department of Surgery, New York University School of Medicine and Langone Medical Center, New York, New York (United States)] [Department of Surgery, New York University School of Medicine and Langone Medical Center, New York, New York (United States); Jozsef, Gabor [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States)] [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States); Goldberg, Judith D. [Division of Biostastistics, Department of Environmental Medicine, New York University School of Medicine and Langone Medical Center, New York, New York (United States)] [Division of Biostastistics, Department of Environmental Medicine, New York University School of Medicine and Langone Medical Center, New York, New York (United States); DeWyngaert, J. Keith [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States)] [Department of Radiation Oncology, New York University School of Medicine and Langone Medical Center, New York, New York (United States)

2012-11-01T23:59:59.000Z

319

Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)  

SciTech Connect (OSTI)

Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

Not Available

2014-09-01T23:59:59.000Z

320

PLANNING DOCUMENT: STUDENT AND ADVISOR Ph.D. Program Benchmark Worksheet  

E-Print Network [OSTI]

PLANNING DOCUMENT: STUDENT AND ADVISOR Ph.D. Program Benchmark Worksheet SCHOOL OF EDUCATION rev072314 Key SoE=School A=Advisor S=Student Target Date Activity Responsibility Welcome Week Receive assignment of advisor and orientation to program SoE Fall ­ Year 1 Meet with advisor Discuss proposed program

Rose, Michael R.

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Multiyear Program Plan: Reducing Friction and Wear in Heavy Vehicles  

SciTech Connect (OSTI)

As described in its multiyear program plan for 1998-2000, the Office of Heavy Vehicle Technologies (OHVT) envisions the development of a fuel-flexible, energy-efficient, near-zero-emissions, heavy-duty U.S. diesel engine technology devolving into all truck classes as a real and viable strategy for reducing energy requirements for commercial transport services and the rapidly growing multipurpose vehicle market (pickups, vans, and sport utility vehicles). Implementation of the OHVT program plan will have significant national benefits in energy savings, cleaner air, more jobs, and increased gross domestic product (GDP). Successful implementation will reduce the petroleum consumption of Class 1-8 trucks by 1.4 million barrels of oil per day by 2020 and over 1.8 million by 2030, amounting to a reduction in highway petroleum consumption of 13.2% and 18.6%, respectively. All types of regulated emissions will be reduced, that is, 20% drop in PM10 emissions (41,000 metric tons per year) by 203 0, 17% reduction in CO2 greenhouse gases (205 million metric tons per year), 7% reduction in NOx, 20% reduction in NMHC, and 30% reduction in CO. An increase of 15,000 jobs by 2020 is expected, as is an increase of $24 billion in GDP. The strategy of OHVT is to focus primarily on the diesel engine since it has numerous advantages. It has the highest efficiency of any engine today, 45% versus 30% for production gasoline engines; and it can be made more efficient at least to 55% and possibly up to 63%. It is the engine of choice for heavy vehicles (trucks), because it offers power, efficiency, durability, and reliability and is used extensively in rail, marine, and off-road applications. Its emission can be ultra-low to near zero, and the production infrastructure is already in place. The primary goals of OHVT are as follows: (1) Develop by 2002 the diesel-engine enabling technologies to support large-scale industry dieselization of light trucks, achieving a 35% fuel efficiency improvement over equivalent gasoline-fueled trucks. (2) Develop by 2004 the enabling technology for a Class 7-8 truck with a fuel efficiency of 10 mpg (at 65 mph) that will meet prevailing emission standards, using either diesel or a liquid alternative fuel. (3) Develop by 2006 diesel engines with fuel flexibility and a thermal efficiency of 55% with liquid alternative fuels, and a thermal efficiency of 55% with dedicated gaseous fuels. (4) Develop a methodology for analyzing and evaluating the operation of a heavy vehicle as an integrated system, considering such factors as engine efficiency; emissions; rolling resistance; aerodynamic drag; friction, wear, and lubrication effects; auxiliary power units; material substitutions for reducing weight; and other sources of parasitic energy losses. Overarching these considerations is the need to preserve system functionality, cost, competitiveness, reliability, durability, and safety.

R.R. Fessler; G.R. Fenske

1999-12-13T23:59:59.000Z

322

Improved Load Plan Design Through Integer Programming Based ...  

E-Print Network [OSTI]

The fundamental building block in load planning is a direct trailer, or a direct. ... of shipment and trailer dispatching; (2) integrated consideration of the movement ...

2011-12-21T23:59:59.000Z

323

Groundwater protection management program plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1.

Not Available

1992-06-01T23:59:59.000Z

324

Performance Demonstration Program Plan for Nondestructive Assay for the TRU Waste Characterization Program. Revision 1  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for Nondestructive Assay (NDA) consists of a series of tests conducted on a regular frequency to evaluate the capability for nondestructive assay of transuranic (TRU) waste throughout the Department of Energy (DOE) complex. Each test is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed with TRU waste characterization systems. Measurement facility performance will be demonstrated by the successful analysis of blind audit samples according to the criteria set by this Program Plan. Intercomparison between measurement groups of the DOE complex will be achieved by comparing the results of measurements on similar or identical blind samples reported by the different measurement facilities. Blind audit samples (hereinafter referred to as PDP samples) will be used as an independent means to assess the performance of measurement groups regarding compliance with established Quality Assurance Objectives (QAOs). As defined for this program, a PDP sample consists of a 55-gallon matrix drum emplaced with radioactive standards and fabricated matrix inserts. These PDP sample components, once manufactured, will be secured and stored at each participating measurement facility designated and authorized by Carlsbad Area Office (CAO) under secure conditions to protect them from loss, tampering, or accidental damage.

None

1997-05-01T23:59:59.000Z

325

MIXED INTEGER PROGRAMMING FOR MULTI-VEHICLE PATH PLANNING  

E-Print Network [OSTI]

.up.pt http://www.fe.up.pt/ecc2001/ Keywords: autonomous vehicles, path planning, collision avoidance Abstract This paper presents a new approach to fuel-optimal path plan- ning of multiple vehicles using a combination will be optimized with respect to both fuel and/or time, and must ensure that the vehicles do not collide with each

How, Jonathan P.

326

Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1  

SciTech Connect (OSTI)

This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond.

NONE

1995-09-01T23:59:59.000Z

327

Polycrystalline silicon This special issue of the Revue de Physique Applique forms a report on five years of research aided and'  

E-Print Network [OSTI]

a report on five years of research aided and' coordinated by the photovoltaic programme of the CNRS and acceptors, Al and oxygen). The introduction of hydrogen causes multiple effects : it increases particulary dominant compared to those of grain boundaries. Finally, it appears that the efficiency of a photovoltaic

Paris-Sud XI, Université de

328

Fire protection program fiscal year 1995 site support program plan, Hanford Fire Department  

SciTech Connect (OSTI)

The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under a mutual aid agreement and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System). The fire department also provides site fire marshal overview authority, fire system testing and maintenance, self-contained breathing apparatus maintenance, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education. This report describes the specific responsibilities and programs that the HFD must support and the estimated cost of this support for FY1995.

Good, D.E.

1994-09-01T23:59:59.000Z

329

Quality assurance program plan for FRG sealed isotopic heat sources project (C-229)  

SciTech Connect (OSTI)

This QAPP implements the Quality Assurance Program Plan for the FRG Sealed Isotopic Heat Sources Project (C-229). The heat source will be relocated from the 324 Building and placed in interim storage at the Central Waste Complex (CWC).

Tanke, J.M.

1997-05-16T23:59:59.000Z

330

Management Policy for Planning, Programming, Budgeting, Operation, Maintenance and Disposal of Real Property  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish Department of Energy (DOE) management policy for the planning, programming, budgeting, operation, maintenance and disposal of real property owned by the United States and under the custody and control of DOE.

2002-05-20T23:59:59.000Z

331

Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.  

SciTech Connect (OSTI)

The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

United States. Bonneville Power Administration. Division of Fish and Wildlife.

1988-11-01T23:59:59.000Z

332

Concurrent constraint programming-based path planning for uninhabited air vehicles  

E-Print Network [OSTI]

Concurrent constraint programming-based path planning for uninhabited air vehicles Stefano Gualandi path length, fuel consumption, and path risk are given as well. 1. INTRODUCTION Path planning is a well, it becomes relevant when defining an air vehicle mission. Due to all the domain constraints to be considered

Bonaventure, Olivier

333

Department of Environmental Studies and Geography STUDENT'S SELF-HELP GUIDE TO PROGRAM PLANNING  

E-Print Network [OSTI]

Economic Geography ESG 212 Urban Geography ESG 248 Geographyof Food ESG 249 Resource Management ESG 264 ESG 348 Urban Planning ESG 349 Watershed Management ESG 350 Environmental Justice ESG 354 EnvirDepartment of Environmental Studies and Geography STUDENT'S SELF-HELP GUIDE TO PROGRAM PLANNING

334

A Multistage Stochastic Programming Approach for the Planning of Offshore Oil or Gas Field Infrastructure  

E-Print Network [OSTI]

1 A Multistage Stochastic Programming Approach for the Planning of Offshore Oil or Gas Field, Houston, TX 77098 Abstract The planning of offshore oil or gas field infrastructure under uncertainty is addressed in this paper. The main uncertainties considered are in the initial maximum oil or gas flowrate

Grossmann, Ignacio E.

335

Heavy Vehicle Propulsion Materials Program: Progress and Highlights  

SciTech Connect (OSTI)

The Heavy Vehicle Propulsion Materials Program was begun in 1997 to support the enabling materials needs of the DOE Office of Heavy Vehicle Technologies (OHVT). The technical agenda for the program grew out of the technology roadmap for the OHVT and includes efforts in materials for: fuel systems, exhaust aftertreatment, valve train, air handling, structural components, electrochemical propulsion, natural gas storage, and thermal management. A five-year program plan was written in early 2000, following a stakeholders workshop. The technical issues and planned and ongoing projects are discussed. Brief summaries of several technical highlights are given.

D. Ray Johnson; Sidney Diamond

2000-06-19T23:59:59.000Z

336

Wind Energy Multiyear Program Plan for 2007-2012  

SciTech Connect (OSTI)

The purpose of this document is to provide an overview of the DOE Wind Energy Program and to describe the near and long-term goals and strategies for achieving the program's mission.

Not Available

2007-08-01T23:59:59.000Z

337

Environmental Implementation Plan  

SciTech Connect (OSTI)

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

338

Public Interest Energy Research Program Research Development and Demonstration Plan  

E-Print Network [OSTI]

and Demonstration Plan Attachment IV - Carbon Sequestration in California's Terrestrial Ecosystems and Geological ..................................................................................................................................1 3.1 Global Warming and the Need for Carbon Sequestration.....................................................1 3.2 Carbon Sequestration Basics

339

Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11  

SciTech Connect (OSTI)

The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

Moore, D.A.

1994-09-01T23:59:59.000Z

340

Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for Nondestructive Assay (NDA) is a test program designed to yield data on measurement system capability to characterize drummed transuranic (TRU) waste generated throughout the Department of Energy (DOE) complex. The tests are conducted periodically and provide a mechanism for the independent and objective assessment of NDA system performance and capability relative to the radiological characterization objectives and criteria of the Office of Characterization and Transportation (OCT). The primary documents requiring an NDA PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC), which requires annual characterization facility participation in the PDP, and the Quality Assurance Program Document (QAPD). This NDA PDP implements the general requirements of the QAPD and applicable requirements of the WAC. Measurement facilities must demonstrate acceptable radiological characterization performance through measurement of test samples comprised of pre-specified PDP matrix drum/radioactive source configurations. Measurement facilities are required to analyze the NDA PDP drum samples using the same procedures approved and implemented for routine operational waste characterization activities. The test samples provide an independent means to assess NDA measurement system performance and compliance per criteria delineated in the NDA PDP Plan. General inter-comparison of NDA measurement system performance among DOE measurement facilities and commercial NDA services can also be evaluated using measurement results on similar NDA PDP test samples. A PDP test sample consists of a 55-gallon matrix drum containing a waste matrix type representative of a particular category of the DOE waste inventory and nuclear material standards of known radionuclide and isotopic composition typical of DOE radioactive material. The PDP sample components are made available to participating measurement facilities as designated by the Carlsbad Field Office (CBFO). The nuclear material type, mass and associated alpha activity of the NDA PDP radioactive standard sets have been specified and fabricated to allow assembly of PDP samples that simulate TRU alpha activity concentrations, radionuclidic/isotopic distributions and physical forms typical of the DOE TRU waste inventory. The PDP matrix drum waste matrix types were derived from an evaluation of information contained in the Transuranic Waste Baseline Inventory Report (TWBIR) to ensure representation of prevalent waste types and their associated matrix characteristics in NDA PDP testing. NDA drum analyses required by the Waste Isolation Pilot Plant (WIPP) may only be performed by measurement facilities that comply with the performance criteria as set forth in the NDA PDP Plan. In this document, these analyses are referred to as WIPP analyses, and the wastes on which they are performed are referred to as WIPP wastes.

Carlsbad Field Office

2005-08-03T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Clean coal technologies: Research, development, and demonstration program plan  

SciTech Connect (OSTI)

The US Department of Energy, Office of Fossil Energy, has structured an integrated program for research, development, and demonstration of clean coal technologies that will enable the nation to use its plentiful domestic coal resources while meeting environmental quality requirements. The program provides the basis for making coal a low-cost, environmentally sound energy choice for electric power generation and fuels production. These programs are briefly described.

Not Available

1993-12-01T23:59:59.000Z

342

IT Capital Planning Corporate Management Improvement Program (CMIP)  

Broader source: Energy.gov [DOE]

The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the...

343

Mission Plan for the Civilian Radioactive Waste Management Program...  

Broader source: Energy.gov (indexed) [DOE]

Waste Management Program Summary In response to the the requirement of the Nuclear Waste Policy Act of 1982, the Office of Civilian Radioactive Waste Management in the...

344

IFE Chamber Technology Testing Program In NIF and Chamber Development Test Plan Mohamed A. Abdou  

E-Print Network [OSTI]

. As ITER serves as a fusion testing facility for magnetic fusion energy (MFE) nuclear technology componentIFE Chamber Technology Testing Program In NIF and Chamber Development Test Plan Mohamed A. Abdou chamber technology testing program in NIF involoving: criteria for evaluation

Abdou, Mohamed

345

Waste certification program plan for Oak Ridge National Laboratory  

SciTech Connect (OSTI)

This document defines the waste certification program being developed for implementation at Oak Ridge National Laboratory (ORNL). The document describes the program structure, logic, and methodology for certification of ORNL wastes. The purpose of the waste certification program is to provide assurance that wastes are properly characterized and that the Waste Acceptance Criteria (WAC) for receiving facilities are met. The program meets the waste certification requirements outlined in U.S. Department of Energy (DOE) Order 5820.2A, Radioactive Waste Management, and ensures that 40 CFR documentation requirements for waste characterization are met for mixed (both radioactive and hazardous) and hazardous (including polychlorinated biphenyls) waste. Program activities will be conducted according to ORNL Level 1 document requirements.

Kornegay, F.C.

1996-09-01T23:59:59.000Z

346

Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for nondestructive assay (NDA) consists of a series of tests to evaluate the capability for NDA of transuranic (TRU) waste throughout the Department of Energy (DOE) complex. Each test is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements obtained from NDA systems used to characterize the radiological constituents of TRU waste. The primary documents governing the conduct of the PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC; DOE 1999a) and the Quality Assurance Program Document (QAPD; DOE 1999b). The WAC requires participation in the PDP; the PDP must comply with the QAPD and the WAC. The WAC contains technical and quality requirements for acceptable NDA. This plan implements the general requirements of the QAPD and applicable requirements of the WAC for the NDA PDP. Measurement facilities demonstrate acceptable performance by the successful testing of simulated waste containers according to the criteria set by this PDP Plan. Comparison among DOE measurement groups and commercial assay services is achieved by comparing the results of measurements on similar simulated waste containers reported by the different measurement facilities. These tests are used as an independent means to assess the performance of measurement groups regarding compliance with established quality assurance objectives (QAO's). Measurement facilities must analyze the simulated waste containers using the same procedures used for normal waste characterization activities. For the drummed waste PDP, a simulated waste container consists of a 55-gallon matrix drum emplaced with radioactive standards and fabricated matrix inserts. These PDP sample components are distributed to the participating measurement facilities that have been designated and authorized by the Carlsbad Field Office (CBFO). The NDA Drum PDP materials are stored at these sites under secure conditions to protect them from loss, tampering, or accidental damage. Using removable PDP radioactive standards, isotopic activities in the simulated waste containers are varied to the extent possible over the range of concentrations anticipated in actual waste characterization situations. Manufactured matrices simulate expected waste matrix conditions and provide acceptable consistency in the sample preparation process at each measurement facility. Analyses that are required by the Waste Isolation Pilot Plant (WIPP) to demonstrate compliance with various regulatory requirements and that are included in the PDP may only be performed by measurement facilities that demonstrate acceptable performance in the PDP. These analyses are referred to as WIPP analyses, and the wastes on which they are performed are referred to as WIPP wastes in this document.

DOE Carlsbad Field Office

2001-04-06T23:59:59.000Z

347

Monitored retrievable storage submission to Congress: Volume 3, Monitored retrievable storage program plan. [Contains glossary  

SciTech Connect (OSTI)

This document presents the current DOE program objectives and the strategy for implementing the proposed program for the integral MRS facility. If the MRS proposal is approved by Congress, any needed revisions to the Program Plan will be made available to the Congress, the State of Tennessee, affected Indian tribes, local governments, other federal agencies, and the public. The proposal for constructing an MRS facility must include: the establishment of a federal program for the siting, development, construction, and operation of MRS facilities; a plan for funding the construction and operation of MRS facilities; site-specific designs, specifications, and cost estimates for the first such facility; a plan for integrating MRS facilities with other storage and disposal facilities authorized by the NWPA. 32 refs., 14 figs., 1 tab.

none,

1987-03-01T23:59:59.000Z

348

Heavy vehicle hybrid propulsion systems R and D program plan, FY 2000-2005  

SciTech Connect (OSTI)

This report contains the program plan and background information for the Heavy Vehicle Hybrid Propulsion R and D Program sponsored by the Department of Energy's Office of Heavy Vehicle Technologies. The program is a collaboration between industry and government established for the development of advanced hybrid-electric propulsion technology for urban cycle trucks and buses. It targets specific applications to enhance potential market success. Potential end-users are also involved.

None

2000-07-01T23:59:59.000Z

349

Revised Master Plan for the Hood River Production Program, Technical Report 2008.  

SciTech Connect (OSTI)

The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP's defined smolt-to-adult (SAR) survival rate guidelines. The observed low SAR was due to precocity, straying, and incidence of BKD in the spring Chinook program; which ultimately led to the program's inability to achieve the subbasin's overly optimistic biological fish objectives. The summer steelhead hatchery program was not providing the fishery or population benefits anticipated and will be discontinued. The winter steelhead program was performing as planned and no changes are foreseen. This updated Master Plan addresses the several proposed changes to the existing HRPP, which are described.

Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

2008-04-28T23:59:59.000Z

350

NYC property tax exemption program : existing policies and future planning  

E-Print Network [OSTI]

New York City's tax expenditures relate to real property tax totaled $4.5 billion in fiscal year 2012. The largest expenditure relates to the "421-a" tax exemption program for new multi-family residential real estate ...

Wu, Jenny Chiani

2012-01-01T23:59:59.000Z

351

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

352

Texas LoanSTAR Monitoring and Analysis Program Draft Plan  

E-Print Network [OSTI]

mechanism to fund energy-conserving retrofits of state, public school and local government buildings. Retrofit projects will be identified by energy audits conducted according to the guidelines of the Texas State Energy Conservation Program (SECP). Each... energy savings projected from the retrofit projects. Public schools and local governments are targeted for Phase II of LoanSTAR. Previous engineering audits of these facilities conducted under the Institutional Conservation Program (ICP) revealed...

Claridge, D. E.; Haberl, J. S.; Heffington, W. M.; O'Neal, D. L.; Turner, W. D.; Etheredge, R.; Glass, M.

1989-01-01T23:59:59.000Z

353

Program Plan for Renewable Energy generation of electricity. Response to Section 2111 of the Energy Policy Act of 1992  

SciTech Connect (OSTI)

A 5-Year Program Plan for providing cost-effective options for generating electricity from renewable energy sources is presented by the US Department of Energy Office of Energy Efficiency and Renewable Energy. The document covers the Utility-Sector situation, scope of the program, specific generating technologies, and implementation of the program plan.

NONE

1994-12-01T23:59:59.000Z

354

Hanford Site Development Plan  

SciTech Connect (OSTI)

The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

1990-01-01T23:59:59.000Z

355

RERTR Program: goals, progress and plans. [Reduced Enrichment Research and Test Reactor  

SciTech Connect (OSTI)

The status of the US Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a brief outline of RERTR Program objectives and goals, program accomplishments are discussed with emphasis on the development, demonstration and application of new LEU fuels. Most program activities have proceeded as planned, and a combination of two silicide fuels (U/sub 3/Si/sub 2/-Al and U/sub 3/Si-Al) holds excellent promise for achieving the long-term program goals. Current plans and schedules project the uranium density of qualified RERTR fuels for plate-type reactors to grow by approximately 1 g U/cm/sup 3/ each year, from the nearly null value of 1982 to the 7.0 g U/cm/sup 3/ which will be reached in early 1989. The technical needs of research reactors for HEU exports are also estimated to undergo a gradual but dramatic decline in the coming years.

Travelli, A.

1984-09-25T23:59:59.000Z

356

Sandia National Laboratories, California Quality Assurance Project Plan for Environmental Monitoring Program.  

SciTech Connect (OSTI)

This Quality Assurance Project Plan (QAPP) applies to the Environmental Monitoring Program at the Sandia National Laboratories/California. This QAPP follows DOE Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance (DOE G 414.1-2A June 17, 2005). The Environmental Monitoring Program is located within the Environmental Operations Department. The Environmental Operations Department is responsible for ensuring that SNL/CA operations have minimal impact on the environment. The Department provides guidance to line organizations to help them comply with applicable environmental regulations and DOE orders. To fulfill its mission, the department has groups responsible for waste management; pollution prevention, air quality; environmental planning; hazardous materials management; and environmental monitoring. The Environmental Monitoring Program is responsible for ensuring that SNL/CA complies with all Federal, State, and local regulations and with DOE orders regarding the quality of wastewater and stormwater discharges. The Program monitors these discharges both visually and through effluent sampling. The Program ensures that activities at the SNL/CA site do not negatively impact the quality of surface waters in the vicinity, or those of the San Francisco Bay. The Program verifies that wastewater and stormwater discharges are in compliance with established standards and requirements. The Program is also responsible for compliance with groundwater monitoring, and underground and above ground storage tanks regulatory compliance. The Program prepares numerous reports, plans, permit applications, and other documents that demonstrate compliance.

Holland, Robert C.

2005-09-01T23:59:59.000Z

357

A Review of the Department of Energy’s Implementation of Executive Order 12898 and Recommendations for a Second Five-Year Strategic Plan  

Broader source: Energy.gov [DOE]

At the request of the U.S Department of Energy’s Office of Legacy Management, the Medical University of South Carolina (MUSC) performed a historical review of the Office’s implementation of...

358

Microsoft Word - 20130823-PR-32-13-Draft-plan-from-Federal-agencies-details-specific-actions-over-next-five-years-to-benefit-fi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMapping RichlandScatteringWater308:UFCpost-centerline13-2014Native

359

A consumer-oriented approach to interpretive program planning for birding  

E-Print Network [OSTI]

Factors. This study supports the contention that a more direct method of obtaining information from visitors is needed. These results were counter to intuition, implying that more than expertise alone is needed for planning. Implications... traditionally focused on the resource base first, developed program objectives next, then decided the media to present this information to the public. This present study examines an alternative method of planning; namely, consulting the visitor first...

Hobson, William Joseph

1982-01-01T23:59:59.000Z

360

A study to determine if in-depth professional development provided to extension educators on program development has an effect on planning, implementing, and evaluating extension educational programs  

E-Print Network [OSTI]

Academy,� was designed and implemented from May 2006 to November 2006 to provide early to mid-career Extension educators with comprehensive instruction related to program planning, program implementation and evaluation and interpretation. A Pre...

Dromgoole, Darrell Allen

2007-09-17T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

DOE Releases Climate Change Technology Program Strategic Plan | Department  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomentheATLANTA, GA - U.S. Department of Energy Secretary Steven Chuof Energy Plan

362

94-1 R&D Program Annual Operating Plan  

SciTech Connect (OSTI)

The 94-1 R&D Program focuses on developing the technical basis for stabilizing and safely storing plutonium-bearing materials. To address these issues, we have in place a material identification and stabilization project, a surveillance and monitoring project, and a management team.

Mason, Richard E.; Dominguez, Pamela D.

2003-09-01T23:59:59.000Z

363

Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for nondestructive assay (NDA) consists of a series of tests to evaluate the capability for NDA of transuranic (TRU) waste throughout the Department of Energy (DOE) complex. Each test is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements obtained from NDA systems used to characterize the radiological constituents of TRU waste. The primary documents governing the conduct of the PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC; DOE 1999a) and the Quality Assurance Program Document (QAPD; DOE 1999b). The WAC requires participation in the PDP; the PDP must comply with the QAPD and the WAC. The WAC contains technical and quality requirements for acceptable NDA. This plan implements the general requirements of the QAPD and applicable requirements of the WAC for the NDA PDP for boxed waste assay systems. Measurement facilities demonstrate acceptable performance by the successful testing of simulated waste containers according to the criteria set by this PDP Plan. Comparison among DOE measurement groups and commercial assay services is achieved by comparing the results of measurements on similar simulated waste containers reported by the different measurement facilities. These tests are used as an independent means to assess the performance of measurement groups regarding compliance with established quality assurance objectives (QAO’s). Measurement facilities must analyze the simulated waste containers using the same procedures used for normal waste characterization activities. For the boxed waste PDP, a simulated waste container consists of a modified standard waste box (SWB) emplaced with radioactive standards and fabricated matrix inserts. An SWB is a waste box with ends designed specifically to fit the TRUPACT-II shipping container. SWB’s will be used to package a substantial volume of the TRU waste for disposal. These PDP sample components are distributed to the participating measurement facilities that have been designated and authorized by the Carlsbad Field Office (CBFO). The NDA Box PDP materials are stored at these sites under secure conditions to protect them from loss, tampering, or accidental damage. Using removable PDP radioactive standards, isotopic activities in the simulated waste containers are varied to the extent possible over the range of concentrations anticipated in actual waste characterization situations. Manufactured matrices simulate expected waste matrix configurations and provide acceptable consistency in the sample preparation process at each measurement facility. Analyses that are required by the Waste Isolation Pilot Plant (WIPP) to demonstrate compliance with various regulatory requirements and that are included in the PDP may only be performed by measurement facilities that demonstrate acceptable performance in the PDP. These analyses are referred to as WIPP analyses, and the wastes on which they are performed are referred to as WIPP wastes in this document.

Carlsbad Field Office

2001-01-31T23:59:59.000Z

364

Savannah River Site Waste Management Program Plan, FY 1993. Revision 1  

SciTech Connect (OSTI)

The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes.

Not Available

1993-06-01T23:59:59.000Z

365

Implementation Plan for the Office of Nuclear Energy Knowledge Management Program  

SciTech Connect (OSTI)

The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

Kimberlyn C. Mousseau

2011-12-01T23:59:59.000Z

366

Environmental implementation plan: Chapter 5, Chemical management, pollution prevention and other compliance programs. Draft revision  

SciTech Connect (OSTI)

Compliance with environmental regulations and US Department of Energy Orders (DOE) relating to environmental protection is an important part of SRS`s program. Over the past few years, the number of environmental regulations has increased. The strategy to comply with new and existing environmental regulations and DOE orders is described in chapter two. In this chapter, the following environmental programs are described: Toxic Substances Control Act (TSCA); Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA); Emergency Planning and Community Right-to-Know Act (EPCRA); and SPCC/BMP/Pollution Prevention Plans;The implementation section identifies issues and those responsible to achieve defined objectives.

Peterson, G.L. [comp.

1993-11-18T23:59:59.000Z

367

SRS ES&H standards compliance program management plan. Revision 1  

SciTech Connect (OSTI)

On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB`s initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the Department of Energy (DOE), called for three actions: (1) identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; (2) assessment of the adequacy of those standards for protecting public health and safety; and (3) determination of the extent to which they have and are being implemented. This document defines the elements of the SRS program required to support the HQ program in response to DNFSB Recommendation 90-2. The objective is to ensure a consistent approach for all sitewide ES and H Standards Compliance Program efforts that satisfied the intent of Recommendation 90-2 and the HQ 90-2 Implementation Plan in a cost-effective manner. The methodology and instructions for implementation of the SRS program are contained in the Standards Compliance Program Implementation Plan. The Management Plan shall be used in conjunction with the Implementation Plan.

Hearn, W.H.

1993-09-08T23:59:59.000Z

368

Energy Storage Program Planning Document (2011) | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQBusinessinSupporting Jobs andHVACEnergy Storage Program

369

Microsoft Word - 20130823-PR-32-13-Draft-plan-from-Federal-agencies...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

plan from Federal agencies details specific actions over next five years to benefit fish Portland, Ore. - Federal agencies and their partners outlined today specific actions...

370

Waste Encapsulation and Storage Facility (WESF) Quality Assurance Program Plan (QAPP)  

SciTech Connect (OSTI)

This Quality Assurance Plan describes how the Waste Encapsulation and Storage Facility (WESF) implements the quality assurance (QA) requirements of the Quality Assurance Program Description (QAPD) (HNF-Mp-599) for Project Hanford activities and products. This QAPP also describes the organizational structure necessary to successfully implement the program. The QAPP provides a road map of applicable Project Hanford Management System Procedures, and facility specific procedures, that may be utilized by WESF to implement the requirements of the QAPD.

ROBINSON, P.A.

2000-04-17T23:59:59.000Z

371

Long term materials test program. Preliminary operations plan  

SciTech Connect (OSTI)

The Long Term Materials Testing (LTMT) PFB facility has been designed to duplicate the design point condition of the Coal-Fired Combined Cycle (CFCC) reference commercial plant design developed by GE under contract to DOE, including bed temperature (1750/sup 0/F), pressure (10 atm), excess air (20%), and gas residence time (1.8 sec). The test rig has a one foot diameter bed and consumes about 1.6 tons/day of coal and 0.5 tons/day of dolomite sulphur sorbent. Material specimens are contained in two test sections. The low velocity test section houses 132 pin specimens 1/4 dia., sixty of which can be cooled below the gas stream temperature. The nominal exposure environment of 1650/sup 0/F, 10 atm, 27 fps should ensure representative corrosive conditions, without erosion. The control system for the LTMT facility is designed to operate the rig in such a manner that the test specimens are subjected to constant, controlled conditions representative of the actual service environment. The Preliminary Test Plan presented in Section V outlines three phases of PFB testing, plus screening tests for candidate materials. Operating costs have been updated to reflect the preliminary rig design data and current raw material quotes. The projected operating costs have been effected by raw material costs since the time of the original estimate, but the overall cost per hour of test is still very low: $122/test hour.

None

1980-03-01T23:59:59.000Z

372

Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan  

SciTech Connect (OSTI)

This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report

Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

2001-10-31T23:59:59.000Z

373

Characterization program management plan for Hanford K basin spent nuclear fuel  

SciTech Connect (OSTI)

The program management plan for characterization of the K Basin spent nuclear fuel was revised to incorporate corrective actions in response to SNF Project QA surveillance 1K-FY-99-060. This revision of the SNF Characterization PMP replaces Duke Eng.

TRIMBLE, D.J.

1999-07-19T23:59:59.000Z

374

An Inventory of Ecosystem Service Valuation Micah Effron, NOAA's Office of Program Planning  

E-Print Network [OSTI]

should NOAA value where? What valuation methods should be used? Is a NOAA valuation strategy evenAn Inventory of Ecosystem Service Valuation Studies Micah Effron, NOAA's Office of Program Planning and Integration 5/22/13 #12; What are ecosystem services? How are they valued? NOAA drivers for valuations

375

engineering101 2013-2014 program planning guide for first-year engineering students  

E-Print Network [OSTI]

engineering101 2013-2014 program planning guide for first-year engineering students in the Whiting School of Engineering at Johns Hopkins University environmental electrical and computer applied math and statistics biomedical computer science mechanical civil chemical and biomolecular engineering mechanics

Ghosh, Somnath

376

Department of Environmental Studies and Geography STUDENT'S SELF-HELP GUIDE TO PROGRAM PLANNING  

E-Print Network [OSTI]

Students must complete 5 courses from one of the three streams Stream A) Environmental Impact and Policy Environmental Justice ESG 354 Envir'tal Impact Assessment ESG 358 Internat'l Environmental Issues ESG 362Department of Environmental Studies and Geography STUDENT'S SELF-HELP GUIDE TO PROGRAM PLANNING

377

CHEMICAL HYGIENE PLAN (rev. 7/03/2012) Page 1 CHEMICAL HYGIENE PROGRAM  

E-Print Network [OSTI]

employers covered by the standard develop a Chemical Hygiene Plan (CHP). A CHP is a written program which, the CHP must include standard operating procedures, criteria for the implementation of chemical control for the interpretation and enforcement of policies described in this CHP. The Environmental Health & Safety staff

378

Automatic Running Planning for Omni-Directional Mobile Robot By Genetic Programming  

E-Print Network [OSTI]

because these OMRs have the running mechanism of wheels installed with free rollers or balls[1-roller running system. The motion analysis is also discussed to realize the autonomic off-road running. In order-directional mobile robot, crawler-roller running system, genetic programming, obstacle, running planning. 1

Fernandez, Thomas

379

A Strategic Program Plan for Fusion Energy Sciences Fusion Energy Sciences  

E-Print Network [OSTI]

, while creating manageable waste and little risk to public safety and health. Making fusion energy a part light atoms such as those of hydrogen, holds great promise for clean and abundant energy produc- tionA Strategic Program Plan for Fusion Energy Sciences 1 Fusion Energy Sciences #12;2 Bringing

380

Bicycle Urbanism Symposium -Program at a glance -Updated June 12, 2013 Advocacy, Planning and Implementation  

E-Print Network [OSTI]

Bicycle Urbanism Symposium - Program at a glance - Updated June 12, 2013 General Theme Advocacy, Planning and Implementation in the Puget Sound The Global Experience + Bicycle Cities of the Future Promoting Bicycling Rider Education / Crunching Numbers: Analyzing and Applying Cycling Data | Panels

Hochberg, Michael

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

IFE chamber technology testing program in NIF and chamber development test plan  

SciTech Connect (OSTI)

Issues concerning chamber technology testing program in NIF involving: criteria for evaluation/prioritization of experiments, engineering scaling requirements for test article design and material selection and R and D plan prior to NIF testing were addressed in this paper. In order to maximize the benefits of testing program in NIF, the testing in NIF should provide the experimental data relevant to DEMO design choice or to DEMO design predictive capability by utilizing engineering scaling test article designs. Test plans were developed for 2 promising chamber design concepts. Early testing in non-fusion/non-ignition prior to testing in ignition facility serves a critical role in chamber R and D test plans in order to reduce the risks and costs of the more complex experiments in NIF.

Abdou, M.A. [Univ. of California, Los Angeles, CA (United States)

1995-12-31T23:59:59.000Z

382

Project Hanford management contract quality assurance program implementation plan for nuclear facilities  

SciTech Connect (OSTI)

During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

Bibb, E.K.

1997-10-15T23:59:59.000Z

383

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect (OSTI)

The DOE has mandated in DOE Order 5400.1 that its operations will be conducted in an environmentally safe manner. The Waste Isolation Pilot Plant (WIPP) will comply with DOE Order 5400.1 and will conduct its operations in a manner that ensures the safety of the environment and the public. This document outlines how the WIPP will protect and preserve groundwater within and surrounding the WIPP facility. Groundwater protection is just one aspect of the WIPP environmental protection effort. The WIPP groundwater surveillance program is designed to determine statistically if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will be determined and appropriate corrective action initiated.

Not Available

1993-12-31T23:59:59.000Z

384

Heavy Vehicle Propulsion Materials: Recent Progress and Future Plans  

SciTech Connect (OSTI)

The Heavy Vehicle Propulsion Materials Program provides enabling materials technology for the U.S. DOE Office of Heavy Vehicle Technologies (OHVT). The technical agenda for the program is based on an industry assessment and the technology roadmap for the OHVT. A five-year program plan was published in 2000. Major efforts in the program are materials for diesel engine fuel systems, exhaust aftertreatment, and air handling. Additional efforts include diesel engine valve-train materials, structural components, and thermal management. Advanced materials, including high-temperature metal alloys, intermetallics, cermets, ceramics, amorphous materials, metal- and ceramic-matrix composites, and coatings, are investigated for critical engine applications. Selected technical issues and planned and ongoing projects as well as brief summaries of several technical highlights are given.

D. Ray Johnson; Sidney Diamond

2001-05-14T23:59:59.000Z

385

Stochastic Programming and its Application to Optimal Generation Planning Stochastic Programming and its  

E-Print Network [OSTI]

to Optimal Generation Planning 4 0 10 20 30 40 50 60 70 80 90 100 0 10 20 30 40 50 60 70 80 90 100 Xraw1 Xraw

McCalley, James D.

386

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 6.0 Program Management  

Broader source: Energy.gov [DOE]

Program Management section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated August 2012. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

387

Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan- Section 2.0 Program Benefits  

Broader source: Energy.gov [DOE]

Program Benefits section of the Fuel Cell Technologies Office Multi-Year Research, Development, and Demonstration Plan; updated August 2012. This plan includes goals, objectives, technical targets, tasks, and schedules for the Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen and Fuel Cells Program.

388

Quality Assurance Plan for Heat Source/Radioisotope Thermoelectric Generator Programs  

SciTech Connect (OSTI)

The purpose of this document is to serve as the Quality Assurance Plan for Heat Source/Radioisotope Thermoelectric Generator (HS/RTG) programs performed at EG&G Mound Applied Technologies. As such, it identifies and describes the systems and activities in place to support the requirements contained in DOE Order 5700.6C as reflected in MD-10334, Mound Quality Policy and Responsibilities and the DOE/RPSD supplement, OSA/PQAR-1, Programmatic Quality Assurance Requirements for Space and Terrestrial Nuclear Power Systems. Unique program requirements, including additions, modifications, and exceptions to these quality requirements, are contained in the appendices of this plan. Additional appendices will be added as new programs and activities are added to Mound's HS/RTG mission assignment.

Gabriel, D. M.; Miller, G. D.; Bohne, W. A.

1995-03-16T23:59:59.000Z

389

Project plan: Procedure system design for the Rocky Flats Plant Emergency Preparedness Program  

SciTech Connect (OSTI)

This procedure system is being designed for the Rocky Flats Plant Emergency Preparedness Program (EPP) to: assess the procedural needs of the Emergency Preparedness Program in light of the existing Rocky Flats Plant policies, plans, procedures, and applicable DOE orders; design the structure of the Emergency Preparedness Program procedural system based on the classes of procedures needed, the types of procedures (procedures vs job outline), the sections of procedures required, and the timetable for procedure maintenance; develop boiler plate formats for the various authors in writing the necessary standardized procedures; develop a list of all the necessary procedures that must be produced for Emergency Preparedness Program; and provide consistency for department-wide activities relating to the quality control in writing, distribution, and revising procedures for Emergency Preparedness Program. 23 refs., 18 figs.

Hodgin, C.R.; Brown-Strattan, M.

1989-10-01T23:59:59.000Z

390

ARESE (ARM Enhanced Shortwave Experiment) Science Plan [Atmospheric Radiation Program  

SciTech Connect (OSTI)

Several recent studies have indicated that cloudy atmospheres may absorb significantly more solar radiation than currently predicted by models. The magnitude of this excess atmospheric absorption, is about 50% more than currently predicted and would have major impact on our understanding of atmospheric heating. Incorporation of this excess heating into existing general circulation models also appears to ameliorate some significant shortcomings of these models, most notably a tendency to overpredict the amount of radiant energy going into the oceans and to underpredict the tropopause temperature. However, some earlier studies do not show this excess absorption and an underlying physical mechanism that would give rise to such absorption has yet to be defined. Given the importance of this issue, the Department of Energy's (DOE) Atmospheric Radiation Measurement (ARM) program is sponsoring the ARM Enhanced Shortwave Experiment (ARESE) to study the absorption of solar radiation by clear and cloudy atmospheres. The experimental results will be compared with model calculations. Measurements will be conducted using three aircraft platforms (ARM-UAV Egrett, NASA ER-2, and an instrumented Twin Otter), as well as satellites and the ARM central and extended facilities in North Central Oklahoma. The project will occur over a four week period beginning in late September, 1995. Spectral broadband, partial bandpass, and narrow bandpass (10nm) solar radiative fluxes will be measured at different altitudes and at the surface with the objective to determine directly the magnitude and spectral characteristics of the absorption of shortwave radiation by the atmosphere (clear and cloudy). Narrow spectral channels selected to coincide with absorption by liquid water and ice will help in identifying the process of absorption of radiation. Additionally, information such as water vapor profiles, aerosol optical depths, cloud structure and ozone profiles, needed to use as input in radiative transfer calculations, will be acquired using the aircraft and surface facilities available to ARESE. This document outlines the scientific approach and measurement requirements of the project.

Valero, F.P.J.; Schwartz, S.E.; Cess, R.D.; Ramanathan, V.; Collins, W.D.; Minnis, P.; Ackerman, T.P.; Vitko, J.; Tooman, T.P.

1995-09-27T23:59:59.000Z

391

1. Emergency Management Plan ACTIVE SHOOTER RESPONSE  

E-Print Network [OSTI]

1. Emergency Management Plan ACTIVE SHOOTER RESPONSE #12;The world has changed!The world has ­ But can transition to one of these #12;Why is this Necessary? Within the last five years, there have been

392

Quality assurance of HDR prostate plans: Program implementation at a community hospital  

SciTech Connect (OSTI)

Adenocarcinoma of the prostate is currently the most commonly diagnosed cancer in men in the United States, and the second leading cause of cancer mortality. The utilization of radiation therapy is regarded as the definitive local therapy of choice for intermediate- and high-risk disease, in which there is increased risk for extracapsular extension, seminal vesicle invasion, or regional node involvement. High-dose-rate (HDR) brachytherapy is a logical treatment modality to deliver the boost dose to an external beam radiation therapy (EBRT) treatment to increase local control rates. From a treatment perspective, the utilization of a complicated treatment delivery system, the compressed time frame in which the procedure is performed, and the small number of large dose fractions make the implementation of a comprehensive quality assurance (QA) program imperative. One aspect of this program is the QA of the HDR treatment plan. Review of regulatory and medical physics professional publications shows that substantial general guidance is available. We provide some insight to the implementation of an HDR prostate plan program at a community hospital. One aspect addressed is the utilization of the low-dose-rate (LDR) planning system and the use of existing ultrasound image sets to familiarize the radiation therapy team with respect to acceptable HDR implant geometries. Additionally, the use of the LDR treatment planning system provided a means to prospectively determine the relationship between the treated isodose volume and the product of activity and time for the department's planning protocol prior to the first HDR implant. For the first 12 HDR prostate implants, the root-mean-square (RMS) deviation was 3.05% between the predicted product of activity and time vs. the actual plan values. Retrospective re-evaluation of the actual implant data reduced the RMS deviation to 2.36%.

Rush, Jennifer B. [Department of Radiation Oncology, High Point Regional Hospital, High Point, NC (United States); Thomas, Michael D. [Department of Radiation Oncology, High Point Regional Hospital, High Point, NC (United States)]. E-mail: mthomas@hprhs.com

2005-01-01T23:59:59.000Z

393

Financial services FY 1995 site support program plan WBS 6.10.4  

SciTech Connect (OSTI)

This is the signed Financial Service fiscal year 1995 Site Support Program Plan, Work Breakdown Structure 6.10.4, for the Hanford site. This plan is intended to enable the contractor to accomplish the following: ensure financial integrity in all Westinghouse Hanford Company (WHC) operation while supporting the programmatic activities of WHC, the US Department of Energy, Richland Operations Office, and other Hanford contractors; provide efficient and effective financial services, and value added audits and review that enable management to enhance future operational results.

Vodney, E.P.

1994-09-01T23:59:59.000Z

394

Issues and answers on the Department of Energy Oil Shale RD and D Program Management Plan  

SciTech Connect (OSTI)

This document consists of Department of Energy replies to public comments made on the Department's Oil Shale RD and D Program and the RD and D Program Management Plan during an oil shale workshop held in December 1979 in Denver, Colorado, and incorporates responses from a number of Department offices and divisions currently associated with the Oil Shale Program. Workshop participants expressed concern in a number of areas associated with oil shale development impacts. Comments addressed effects on water quality and availability; air quality and solid waste impacts; impacts on terrestrial ecosystems; the pace of oil shale development; health, safety, and socioeconomic concerns; coordination among Federal, State, and local agencies during development of the shale resource; legislative and regulatory issues; financing of oil shale development; continued public education and involvement; and technology considerations (e.g., comments relating to shale oil upgrading, refining, product composition, and stability). Replies made by RD and D Program staff to the comments of workshop participants provide an overview of Department of Energy oil shale activities, both planned and ongoing, in the areas of concern addressed by the workshop. Although the responses focus on Department efforts to resolve these concerns, the research activities and responsibilities of other Federal agencies are also outlined. To supplement the RD and D Program response, recently published sources of information on oil shale development are identified that offer the public a more thorough description of Departmental research programs.

None

1980-09-01T23:59:59.000Z

395

Environmental restoration and waste management Site-Specific Plan for the Oak Ridge Reservation. FY 1993  

SciTech Connect (OSTI)

The United States Department of Energy (DOE) is committed to achieving and maintaining environmental regulatory compliance while responding to public concerns and emphasizing waste minimization. DOE publishes the Environmental Restoration and Waste Management Five-Year Plan (FYP) annually to document its progress towards these goals. The purpose of this Site-Specific Plan (SSP) is to describe the activities undertaken to implement the FYP goals at the DOE Oak Ridge Field Office (DOE/OR) installations and programs specifically for the Oak Ridge Reservation (ORR) and surrounding areas. This SSP addresses activities and goals to be accomplished during FY93 even through the FYP focuses on FY94.

Not Available

1993-01-15T23:59:59.000Z

396

Quality Assurance (QA) Program Plan Conceptual Design Phase of Project W-521 Waste Feed Delivery Systems [SUPERSEDED BY RPP-6649 Rev. 0  

SciTech Connect (OSTI)

The Quality Assurance Program Plan (QAPP) describes the quality assurance implementation strategy for Project W-521 during conceptual design.

WHITE, K.A.

2000-08-02T23:59:59.000Z

397

Quality assurance program plan for the Site Physical and Electrical Calibration Services Lab. Revision 1  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) is organized to address WHC`s implementation of quality assurance requirements as they are presented as interpretive guidance endorsed by the Department of Energy (DOE) Field Office, Richland DOE Order 5700.6C Quality Assurance. The quality assurance requirements presented in this plan will assure Measuring and Test Equipment (M and TE) are in conformance with prescribed technical requirements and that data provided by testing, inspection, or maintenance are valid. This QAPP covers all activities and work elements that are variously called QA, quality control, and quality engineering regardless of the organization performing the work. This QAPP identifies the QA requirements for planning, control, and documentation of operations, modifications, and maintenance of the WHC Site Physical and Electrical Calibration Services Laboratory. The primary function of the WHC Site Physical and Electrical Calibration Services Laboratory is providing calibration, standardization, or repair service of M and TE.

Carpenter, C.A.

1995-03-02T23:59:59.000Z

398

Tanks Focus Area Alternative Salt Processing Research and Development Program Plan  

SciTech Connect (OSTI)

In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA) to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

Harmon, Harry D.

2000-11-30T23:59:59.000Z

399

Tanks Focus Area Alternative Salt Processing Research and Development Program Plan  

SciTech Connect (OSTI)

In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA)to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

Harmon, Harry D.

2000-05-15T23:59:59.000Z

400

A technology transfer plan for the US Department of Energy's Electric Energy Systems Program  

SciTech Connect (OSTI)

The major objective of this study was to develop a technology transfer plan that would be both practical and effective in promoting the transfer of the products of DOE/EES research to appropriate target audiences. The study drew upon several major components of the marketing process in developing this plan: definition/charcterization of the products being produced by the DOE/EES program, identification/characterization of possible users of the products being produced by the program, and documentation/analysis of the methods currently being used to promote the adoption of DOE/EES products. Fields covered include HVDC, new materials, superconductors, electric field effects, EMP impacts, battery storage/load leveling, automation/processing concepts, normal/emergency operating concepts, Hawaii deep water cable, and failure mechanisms.

Harrer, B.J.; Hurwitch, J.W.; Davis, L.J.

1986-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Texas geothermal R D and D program planning support document. Final report  

SciTech Connect (OSTI)

Program planning support was provided by; developing a geothermal RD and D program structure, characterizing the status of geothermal RD and D through review of literature and interaction with the geothermal research community, developing a candidate list of future Texas geothermal projects, and prioritizing the candidate projects based on appropriate evaluation criteria. The method used to perform this study and the results thereof are presented. Summary reviews of selected completed and ongoing projects and summary descriptions and evaluations of the candidate RD and D projects ar provided. A brief discussion emerging federal RD and D policies is presented. References and independent project rankings by three of the GRP members are included. (MHR)

Davis, R.J.; Conover, M.F.; Keeney, R.C.; Personett, M.L.; Richmann, D.L.

1981-08-28T23:59:59.000Z

402

UMTRA Project Office Federal Employee Occupational Safety and Health Program Plan. Final draft  

SciTech Connect (OSTI)

This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with the applicable requirements of DOE Order 3790.1 B and DOE Albuquerque Operations Office (AL) Order 3790.1A. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES&H) Plan (DOE, 1992), which establishes the basic programmatic ES&H requirements for all participants on the UMTRA Project. The ES&H plan is designed primarily to cover remedial action activities at UMTRA sites, and defines the ES&H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES&H program and covers only the federal employees working on the UMTRA Project.

Young, B.H.

1994-02-01T23:59:59.000Z

403

UMTRA project office federal employee occupational safety and health program plan. Revision 1  

SciTech Connect (OSTI)

This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES&H) Plan (DOE, 1992), which establishes the basic programmatic ES&H requirements for all participants on the UMTRA Project. The ES&H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES&H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES&H program and covers only federal employees working on the UMTRA Project.

Not Available

1994-06-01T23:59:59.000Z

404

Oak Ridge Y-12 Plant biological monitoring and abatement program (BMAP) plan  

SciTech Connect (OSTI)

The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y-12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided, but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas or a reduction in sampling intensity in others. By using the results of previous monitoring efforts to define the current program and to guide them in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

Adams, S.M.; Brandt, C.C.; Cicerone, D.S. [and others

1998-02-01T23:59:59.000Z

405

Quality Assurance Program Plan for the Waste Sampling and Characterization Facility  

SciTech Connect (OSTI)

The objective of this Quality Assurance Plan is to provide quality assurance (QA) guidance, implementation of regulatory QA requirements, and quality control (QC) specifications for analytical service. This document follows the Department of Energy (DOE)-issued Hanford Analytical Services Quality Assurance Plan (HASQAP) and additional federal [10 US Code of Federal Regulations (CFR) 830.120] QA requirements that HASQAP does not cover. This document describes how the laboratory implements QA requirements to meet the federal or state requirements, provides what are the default QC specifications, and/or identifies the procedural information that governs how the laboratory operates. In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. This document also covers QA elements that are required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAPPs), (QAMS-004), and Interim Guidelines and Specifications for Preparing Quality Assurance Product Plans (QAMS-005) from the Environmental Protection Agency (EPA). A QA Index is provided in the Appendix A.

Grabbe, R.R.

1995-03-02T23:59:59.000Z

406

General Counsel`s office FY 1995 site support program plan WBS 6.10.5  

SciTech Connect (OSTI)

The General Counsel`s office provides legal counsel to all levels of WHC management; administers the intellectual property program; coordinates all WHC investigative activity and supports WHC activities to ensure compliance with all applicable federal, state, and local laws, DOE directives, contractual provisions, and other requirements. In so doing, the Office of General Counsel supports the Hanford site mission of transforming the Hanford site into an environmentally attractive and economically sustainable community. This document briefs the FY95 site support plan.

Moreno, S.R.

1994-09-01T23:59:59.000Z

407

The Revised WIPP Passive Institutional Controls Program - A Conceptual Plan - 13145  

SciTech Connect (OSTI)

The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing all activities related to the disposal of TRU and TRU-mixed waste in the geologic repository, 650 m below the land surface, at WIPP, near Carlsbad, New Mexico. The main function of the Passive Institutional Controls (PIC's) program is to inform future generations of the long-lived radioactive wastes buried beneath their feet in the desert. For the first 100 years after cessation of disposal operations, the rooms are closed and the shafts leading underground sealed, WIPP is mandated by law to institute Active Institutional Controls (AIC's) with fences, gates, and armed guards on patrol. At this same time a plan must be in place of how to warn/inform the future, after the AIC's are gone, of the consequences of intrusion into the geologic repository disposal area. A plan was put into place during the 1990's with records management and storage, awareness triggers, permanent marker design concepts and testing schedules. This work included the thoughts of expert panels and individuals. The plan held up under peer review and met the requirements of the U.S. Environmental Protection Agency (EPA). Today the NEA is coordinating a study called the 'Preservation of Records, Knowledge and Memory (RK and M) Across Generations' to provide the international nuclear waste repository community with a guide on how a nuclear record archive programs should be approached and developed. CBFO is cooperating and participating in this project and will take what knowledge is gained and apply that to the WIPP program. At the same time CBFO is well aware that the EPA and others are expecting DOE to move forward with planning for the future WIPP PIC's program; so a plan will be in place in time for WIPP's closure slated for the early 2030's. The DOE/CBFO WIPP PIC's program in place today meets the regulatory criteria, but complete feasibility of implementation is questionable, and may not be in conformance with the international guidance being developed. International guidance currently under development may suggest that the inter-generational equity principle strives to warn the future, however, in doing so not to unduly burden present generations. Building markers and monuments that are out of proportion to the risk being presented to the future is not in keeping with generational equity. With this in mind the DOE/CBFO is developing conceptual plans for re-evaluating and revising the current WIPP PIC's program. These conceptual plans will suggest scientific and technical work that must be completed to develop a 'new' PICs program that takes the best ideas of the present plan, blended with new ideas from the RK and M project, and proposed alternative permanent markers designs and materials in consideration. (authors)

Patterson, Russ [Department of Energy-Carlsbad Field Office, 4021 National Parks Highway Carlsbad, NM 88220 (United States)] [Department of Energy-Carlsbad Field Office, 4021 National Parks Highway Carlsbad, NM 88220 (United States); Klein, Thomas [URS-Professional Solutions, 4021 National Parks Highway Carlsbad, NM 88220 (United States)] [URS-Professional Solutions, 4021 National Parks Highway Carlsbad, NM 88220 (United States); Van Luik, Abraham [Department of Energy-Carlsbad Field Office, 4021 National Parks Highway Carlsbad, NM 88220 (United States)] [Department of Energy-Carlsbad Field Office, 4021 National Parks Highway Carlsbad, NM 88220 (United States)

2013-07-01T23:59:59.000Z

408

Program Plan for Revision of the Z-Area Saltstone Disposal Facility Performance Assessment  

SciTech Connect (OSTI)

Savannah River National Laboratory (SRNL) and the Saltstone Project, are embarking on the next revision to the Saltstone Disposal Facility (SDF) performance assessment (PA). This program plan has been prepared to outline the general approach, scope, schedule and resources for the PA revision. The plan briefly describes the task elements of the PA process. It discusses critical PA considerations in the development of conceptual models and interpretation of results. Applicable quality assurance (QA) requirements are identified and the methods for implementing QA for both software and documentation are described. The plan identifies project resources supporting the core team and providing project oversight. Program issues and risks are identified as well as mitigation of those risks. Finally, a preliminary program schedule has been developed and key deliverables identified. A number of significant changes have been implemented since the last PA revision resulting in a new design for future SDF disposal units. This revision will encompass the existing and planned disposal units, PA critical radionuclides and exposure pathways important to SDF performance. An integrated analysis of the overall facility layout, including all disposal units, will be performed to assess the impact of plume overlap on PA results. Finally, a rigorous treatment of uncertainty will be undertaken using probabilistic simulations. This analysis will be reviewed and approved by DOE-SR, DOE-HQ and potentially the Nuclear Regulatory Commission (NRC). This revision will be completed and ready for the start of the DOE review at the end of December 2006. This work supports a Saltstone Vault 2 fee-bearing milestone. This milestone includes completion of the Vault 2 module of the PA revision by the end of FY06.

Cook, James R.

2005-12-07T23:59:59.000Z

409

Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources  

E-Print Network [OSTI]

v.08.2011 Nutrient Management Educational & Planning Resources The Pennsylvania Nutrient Management Education Program provides a wide array of resources to nutrient management specialists. These resources serve two purposes: · Education. These factsheets and publications are selected to supplement

Guiltinan, Mark

410

Review of the Texas Emissions Reduction Plan (TERP) Program for Political Subdivisions, Institutions of Higher Education and State Agencies  

E-Print Network [OSTI]

This report provides a concise review of the Energy Systems Laboratory's experience in evaluating the Texas Emissions Reduction Plan (TERP) Program for Political Subdivisions, Institutions of Higher Education & State Agencies (Texas Health...

Claridge, D. E.; Haberl, J. S.; Yazdani, B. L.; Zilbershtein, G.

2013-01-01T23:59:59.000Z

411

SRS ES and H Standards Compliance Program Implementation Plan. Revision 1  

SciTech Connect (OSTI)

On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB`s initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the U.S. Department of Energy (DOE), called for three actions: identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; assessment of the adequacy of those standards for protecting public health and safety; and determination of the extent to which they have and are being implemented. The purpose of this Implementation Plan is to define the single program for all sitewide and facility 90-2 ES and H Standards Compliance efforts, which will satisfy the HQ Implementation Plan, avoid duplicate efforts, be as simple and achievable as possible, include cost-saving innovations, use a graded approach based on facility hazards and future needs of facilities, and support configuration control for facility requirements. The Defense Waste Processing Facility (DWPF) has been designated a pilot facility for the 90-2 program and has progressed with their facility program ahead of the site-level program. The DWPF, and other Government-Owned Contractor-Operated (GOCO) facilities that progress on an enhanced schedule, will serve as pilot facilities for the site-level program. The lessons learned with their requirement identifications, and their assessments of the adequacy of and their compliance with these requirements will be used to improve the efficiency of the site-level and subsequent programs.

Hearn, W.H.

1993-09-08T23:59:59.000Z

412

Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program Plan  

SciTech Connect (OSTI)

The revised Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted as required by the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995 and became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Science Division (ESD) at the Oak Ridge National Laboratory (ORNL) at the request of the Y-12 Plant. The revision to the BMAP plan is based on results of biological monitoring conducted during the period of 1985 to present. Details of the specific procedures used in the current routine monitoring program are provided; experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional bioaccumulation monitoring if results indicate unexpectedly high PCBs or Hg) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is still observed). The program scope will be re-evaluated annually. By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of Y-12 Plant operations (past and present) on the biota of EFPC and to document the ecological effects of remedial actions.

Adams, S.M.; Brandt, C.C.; Christensen, S.W.; Greeley, M.S.JR.; Hill, W.R.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.

2000-09-01T23:59:59.000Z

413

Advanced Materials Development Program: Ceramic Technology for Advanced Heat Engines program plan, 1983--1993  

SciTech Connect (OSTI)

The purpose of the Ceramic Technology for Advanced Heat Engines (CTAHE) Project is the development of an industrial technology base capable of providing reliable and cost-effective high temperature ceramic components for application in advanced heat engines. There is a deliberate emphasis on industrial'' in the purpose statement. The project is intended to support the US ceramic and engine industries by providing the needed ceramic materials technology. The heat engine programs have goals of component development and proof-of-concept. The CTAHE Project is aimed at developing generic basic ceramic technology and does not involve specific engine designs and components. The materials research and development efforts in the CTAHE Project are focused on the needs and general requirements of the advanced gas turbine and low heat rejection diesel engines. The CTAHE Project supports the DOE Office of Transportation Systems' heat engine programs, Advanced Turbine Technology Applications (ATTAP) and Heavy Duty Transport (HDT) by providing the basic technology required for development of reliable and cost-effective ceramic components. The heat engine programs provide the iterative component design, fabrication, and test development logic. 103 refs., 18 figs., 11 tabs.

Not Available

1990-07-01T23:59:59.000Z

414

Department of Defense (DOD) renewables and energy efficiency planning (REEP) program manual  

SciTech Connect (OSTI)

The Renewables and Energy Efficiency Planning (REEP) program was developed at the US Army Construction Engineering Research Laboratories (USACERL). This program allows for the analysis of 78 energy and water conservation opportunities at 239 major DOD installations. REEP uses a series of algorithms in conjunction with installation specific data to estimate the energy and water conservation potential for entire installations. The program provides the energy, financial, pollution, and social benefits of conservation initiatives. The open architecture of the program allows for simple modification of energy and water conservation variables, and installation database values to allow for individualized analysis. The program is essentially a high-level screening tool that can be used to help identify and focus preliminary conservation studies. The REEP program requires an IBM PC or compatible with a 80386 or 80486 microprocessor. It also requires approximately 4 megabytes of disk space and at least 8 megabytes of RAM. The system was developed for a Windows environment and requires Microsoft Windows 3.1{trademark} or higher to run properly.

Nemeth, R.J.; Fournier, D.; Debaillie, L.; Edgar, L.; Stroot, P.; Beasley, R.; Edgar, D.; McMillen, L.; Marren, M.

1995-08-01T23:59:59.000Z

415

Information management fiscal year 1996 site support program plan, WBS 6.4. Revision 1  

SciTech Connect (OSTI)

In the recent past, information resource management (IRM) was a neatly separable component of the overall DOE mission, concerned primarily with procuring and implementing automatic data processing (ADP) systems. As the DOE missions have shifted from producing product to managing processes, those clear lines have blurred. Today, IRM is firmly embedded in all aspects of the DOE mission. BCS Richland, Inc., (BCSR) provides IRM for the Hanford Site. The main focus in executing this mission is to meet customer goals by providing high-quality, timely, and cost-effective electronic communication, computing, and information services. Information resources provide the US Department of Energy, Richland Operations Office (RL) and the Hanford Site contractors the ability to generate, store, access, and communicate information quickly, reliably, and cost effectively. BCSR plans, implements, and operates electronic communication, computing and information management systems that enable effective operation of the Hanford Site. Five strategic initiatives to encompass the vision provide guidance and focus to the information technology (IT) direction for developing the BCSR program plan. These strategic initiatives are the program vision and are as follows: primary focus; fast response; accessible information; world class information management infrastructure; powerful desktop. The business directions that guide the development of the BCSR Program Plan are: (1) emphasize providing cost-effective and value-added communication, computing, and information systems products and services to the Site missions; (2) strengthen the alignment of products and services with Site projects and programs and eliminate duplications Sitewide; (3) focus on the effective resolution of critical Site information management (IM) issues.

NONE

1995-09-01T23:59:59.000Z

416

Fire protection program fiscal year 1997 site support program plan - Hanford fire department  

SciTech Connect (OSTI)

The mission of the Hanford Fires Department (HFD) is to support the safe and timely cleanup of the Hanford Site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. this includes response to surrounding fire department districts under mutual aids agreements and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site. the fire department also provides site fire marshal overview authority, fire system testing, and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention and education.

Good, D.E., Westinghouse Hanford

1996-07-01T23:59:59.000Z

417

Waste management/waste certification plan for the Oak Ridge National Laboratory Environmental Restoration Program  

SciTech Connect (OSTI)

This Waste Management/Waste Certification (C) Plan, written for the Environmental Restoration (ER) Program at Oak Ridge National Laboratory (ORNL), outlines the criteria and methodologies to be used in the management of waste generated during ORNL ER field activities. Other agreed upon methods may be used in the management of waste with consultation with ER and Waste Management Organization. The intent of this plan is to provide information for the minimization, handling, and disposal of waste generated by ER activities. This plan contains provisions for the safe and effective management of waste consistent with the U.S. Environmental Protection Agency`s (EPA`s) guidance. Components of this plan have been designed to protect the environment and the health and safety of workers and the public. It, therefore, stresses that investigation derived waste (IDW) and other waste be managed to ensure that (1) all efforts be made to minimize the amount of waste generated; (2) costs associated with sampling storage, analysis, transportation, and disposal are minimized; (3) the potential for public and worker exposure is not increased; and (4) additional contaminated areas are not created.

Clark, C. Jr.; Hunt-Davenport, L.D.; Cofer, G.H.

1995-03-01T23:59:59.000Z

418

Comp Plan: A computer program to generate dose and radiobiological metrics from dose-volume histogram files  

SciTech Connect (OSTI)

Treatment planning studies often require the calculation of a large number of dose and radiobiological metrics. To streamline these calculations, a computer program called Comp Plan was developed using MATLAB. Comp Plan calculates common metrics, including equivalent uniform dose, tumor control probability, and normal tissue complication probability from dose-volume histogram data. The dose and radiobiological metrics can be calculated for the original data or for an adjusted fraction size using the linear quadratic model. A homogeneous boost dose can be added to a given structure if desired. The final output is written to an Excel file in a format convenient for further statistical analysis. Comp Plan was verified by independent calculations. A lung treatment planning study comparing 45 plans for 7 structures using up to 6 metrics for each structure was successfully analyzed within approximately 5 minutes with Comp Plan. The code is freely available from the authors on request.

Holloway, Lois Charlotte, E-mail: lois.holloway@sswahs.nsw.gov.au [Liverpool and Macarthur Cancer Therapy Centres, Sydney (Australia); Center for Medical Radiation Physics, University of Wollongong (Australia); Institute of Medical Physics, University of Sydney (Australia); Miller, Julie-Anne [Liverpool and Macarthur Cancer Therapy Centres, Sydney (Australia); Institute of Medical Physics, University of Sydney (Australia); Kumar, Shivani [Liverpool and Macarthur Cancer Therapy Centres, Sydney (Australia); Whelan, Brendan M. [Institute of Medical Physics, University of Sydney (Australia); Vinod, Shalini K. [Liverpool and Macarthur Cancer Therapy Centres, Sydney (Australia); University of New South Wales (Australia)

2012-10-01T23:59:59.000Z

419

B.A. Major in Planning 2014-2015 Students should have their program approved by their Program Advisor every year.  

E-Print Network [OSTI]

_______ HGP 250 Natural Resources and Environmental Management _______ HGP 252 Human DimensionsB.A. Major in Planning 2014-2015 Students should have their program approved by their Program _______ HGP 100 Cultures, Landscapes and Geographic Space _______ ENGL 1xx _______ ENGL 1xx or WRS 1xx

Machel, Hans

420

B.A. Major in Planning 2013-2014 Students should have their program approved by their Program Advisor every year.  

E-Print Network [OSTI]

Environment _______ HGP 250 Natural Resources and Environmental Management _______ HGP 252 Human DimensionsB.A. Major in Planning 2013-2014 Students should have their program approved by their Program _______ HGP 100 Cultures, Landscapes and Geographic Space _______ ENGL 1xx _______ ENGL 1xx or WRS 1xx

Machel, Hans

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Vehicle Technologies Program - Multi-Year Program Plan 2011-2015  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyTheTwoVulnerabilitiesPowertrainReadiness forMulti-Year Program

422

Plutonium stabilization and disposition focus area, FY 1999 and FY 2000 multi-year program plan  

SciTech Connect (OSTI)

Consistent with the Environmental Management`s (EM`s) plan titled, ``Accelerating Cleanup: Paths to Closure``, and ongoing efforts within the Executive Branch and Congress, this Multi-Year Program Plan (MYPP) for the Plutonium Focus Area was written to ensure that technical gap projects are effectively managed and measured. The Plutonium Focus Area (PFA) defines and manages technology development programs that contribute to the effective stabilization of nuclear materials and their subsequent safe storage and final disposition. The scope of PFA activities includes the complete spectrum of plutonium materials, special isotopes, and other fissile materials. The PFA enables solutions to site-specific and complex-wide technology issues associated with plutonium remediation, stabilization, and preparation for disposition. The report describes the current technical activities, namely: Plutonium stabilization (9 studies); Highly enriched uranium stabilization (2 studies); Russian collaboration program (2 studies); Packaging and storage technologies (6 studies); and PFA management work package/product line (3 studies). Budget information for FY 1999 and FY 2000 is provided.

NONE

1998-03-01T23:59:59.000Z

423

OAK RIDGE Y-12 PLANT BIOLOGICAL MONITORING AND ABATEMENT PROGRAM (BMAP) PLAN  

SciTech Connect (OSTI)

The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y- 12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional toxicity testing if initial results indicate low survival or reproduction) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is observed). By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

ADAMS, S.M.; BRANDT, C.C.; CHRISTENSEN, S.W.; CICERONE, D.S.; GREELEY, M.S.JR; HILL, W.R.; HUSTON, M.S.; KSZOS, L.A.; MCCARTHY, J.F.; PETERSON, M.J.; RYON, M.G.; SMITH, J.G.; SOUTHWORTH, G.R.; STEWART, A.J.

1998-10-01T23:59:59.000Z

424

Data collection plan for Phase 2 Alternative Fuels Bus Data Collection Program. Final report  

SciTech Connect (OSTI)

This document constitutes the plan for collecting and reporting data associated with a special set of transit bus demonstrations to be conducted under the Urban Bus Program of the Alternative Motor Fuels Act (AMFA) of 1988. This program, called the Phase 2 Bus Data Collection Program, serves as an adjunct to the Phase I Bus Data Collection Program, collecting detailed data on just a few buses to augment and enhance the Phase 1 data in fulfilling the urban bus requirements of AMFA. Demonstrations will be conducted at a few transit system locations throughout the US and will use alternative fuels and associated technologies to reduce undesirable transit bus exhaust emissions. Several organizations will be involved in the data collection; NREL will manage the program, analyze and store vehicle data, and make these data available through the Alternative Fuels Data Center. This information will enable transit agencies, equipment manufacturers, fuel suppliers, and government policy makers to make informed decisions about buying and using alternative fuels.

Krenelka, T. [Battelle Columbus Labs., OH (United States)] [Battelle Columbus Labs., OH (United States)

1993-07-01T23:59:59.000Z

425

Program plan for research and development of HVDC power systems and components  

SciTech Connect (OSTI)

The Division of Electric Energy Systems (EES) of the US Department of Energy (DOE) has formulated a program for research and development (R and D) of high-voltage direct-current (HVDC) power transmission and delivery systems and associated dc components. The program includes analysis of future utility system applications, development of new HVDC control and protection concepts, and advanced dc component research. The structure of this program will provide an appropriate balance between mid- and long-term options for the enhancement of HVDC power transmission and delivery for future electric power systems. This HVDC research program is intended to further develop and improve an important energy transport technology, one that will offer many opportunities to reduce future energy costs. The economics and operating constraints in alternating-current (ac) solutions strongly indicate that new HVDC technology options will be advantageous and will provide an enhanced ability to use generation and transmission system resources efficiently and economically in existing electric energy systems. Studies show that further development of this technology will lead to significant integration of new HVDC techniques into existing electric energy systems with appreciable economic and technical benefit. The R and D proposed in this HVDC Program Plan will be of substantial value to future electric power systems.

Not Available

1984-01-01T23:59:59.000Z

426

Corporate planning for compliance with EPA`s proposed risk management program rule  

SciTech Connect (OSTI)

On October 20, 1993, the US Environmental Protection Agency (EPA) published in the Federal Register the proposed rule entitled Risk Management Programs for Chemical Accidental Release Prevention (40 CFR 68). Subsequently, on January 31, 1994, EPA published in the Federal Register the finalized list of 77 regulated toxic substances and 63 regulated flammable substances that are to be covered under the rule along with the associated threshold quantities for each substance. This list of substances will dictate which stationary sources will have to comply with the requirements of the proposed risk management program rule. The risk management program rule will most likely be finalized sometime after mid-1995. Covered facilities will then have a total of three years to achieve complete compliance with the requirements of the rule. This paper presents an approach for corporations with multiple sites to develop action plans for implementation of the risk management program rule. The process starts with a determination of which facilities are potentially covered, development of a matrix of requirements that each facility must comply with, and finally, common strategies that may be used in achieving compliance. Thus, a multi-facility corporation can develop a baseline compliance guideline document that individual plants can use in developing and implementing their risk management programs.

Mannan, M.; Keeney, R.C. [RMT/Jones and Neuse, Inc., Austin, TX (United States)

1995-12-31T23:59:59.000Z

427

Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2  

SciTech Connect (OSTI)

This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or documented ? Provides instructions for implementing annual S&M inspections and activities The following facilities that were included in Revision 1 of this plan have reached final disposition and are no longer in the S&M program: ? Reactor Maintenance, Assembly, and Disassembly Facility, Building 25-3110 ? Test Cell A Facility, Building 25-3113 ? TCC Facility, Building 25-3210 ? Pluto Disassembly Facility, Building 26-2201 ? Super Kukla Facility, Building 27-5400

Poderis, Reed J. [NSTec] [NSTec; King, Rebecca A. [NSTec] [NSTec

2013-09-30T23:59:59.000Z

428

Hanford environmental management program multi-year work plan FY1998  

SciTech Connect (OSTI)

The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year`s work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ``Work Authorization`` identifies the impacted scope and requires the Contracting Officer`s or Assistant Manager-Contracting Officer`s Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ``Project Summary Section`` and Section Two is titled the ``Additional Sections at the Project Baseline Summaries Level``. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS {number_sign} RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP, exclusive of the other programs under the Mission Support PBS. This MYWP thus has a Section One that speaks to two programs, and two Section Two`s, one each for HEMP and EEM.

Giese, K.A.

1997-08-25T23:59:59.000Z

429

2033 Long Range Transportation Plan and FY 2010-2013 Transportation Improvement Program  

E-Print Network [OSTI]

was adopted in June 2005 by the MPO and prepared under the guidelines of the Transportation Equity Act for the 21st Century (TEA-21). The 2033 LRP reaffirms the basic issues and goals of the previous plans while considering additional matters of concern.... The two landmark bills that brought surface transportation into the 21 st century?the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) and the Transportation Equity Act for the 21 st Century (TEA-21)?shaped the highway program to meet...

The West-Memphis Metropolitan Planning Organization

430

Acid rain program: CEMS submission instructions for monitoring plans, certification test notifications, and quarterly reports  

SciTech Connect (OSTI)

The Acid Rain Program regulations require all affected utility units to continuously measure, record and report SO2, NOx, volumetric flow data and CO2 emissions. All affected units also must continuously measure and record opacity, and must report opacity exceedances to the appropriate State or Local Agency. To ensure that your CEMS and fuel flowmeters are performing at an acceptable level, and providing quality assured data, you are required under 40 CFR 75.53, 75.62 (a) to submit a monitoring plan and certification test data for acid rain CEM certificaton. The purpose of this handbook is to help you fulfill your requirements under the Acid Rain Program. This handbook will walk you through the necessary steps for gaining CEMS certification, including filling out and mailing the proper forms, administering the required tests, and applying for certification and sending in electronic data to EPA.

NONE

1995-05-12T23:59:59.000Z

431

Next Generation Nuclear Plant Methods Research and Development Technical Program Plan -- PLN-2498  

SciTech Connect (OSTI)

One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

2008-09-01T23:59:59.000Z

432

Voluntary Truck and Bus Fuel-Economy-Program marketing plan. Final technical report, September 29, 1980-January 29, 1982  

SciTech Connect (OSTI)

The aim of the program is to improve the utilization of fuel by commercial trucks and buses by updating and implementing specific approaches for educating and monitoring the trucking industry on methods and means of conserving fuels. The following outlines the marketing plan projects: increase use of program logo by voluntary program members and others; solicit trade publication membership and support; brief Congressional delegations on fuel conservation efforts; increase voluntary program presence before trade groups; increase voluntary program presence at truck and trade shows; create a voluntary program display for use at trade shows and in other areas; review voluntary program graphics; increase voluntary program membership; and produce placemats carrying fuel conservation messages; produce a special edition of Fuel Economy News, emphasizing the driver's involvement in fuel conservation; produce posters carrying voluntary program fuel conservation message. Project objectives, activities, and results for each project are summarized.

none,

1982-01-01T23:59:59.000Z

433

Starting a local conservation and passive solar retrofit program: an energy planning sourcebook  

SciTech Connect (OSTI)

A city planner or a neighborhood activist may wish to initiate a local conservation and passive solar retrofit program but may not have previous experience in doing so. This sourcebook is designed to assist interested individuals with their energy planning efforts, from determining retrofit potential, to financing and implementing the program. An approach or methodology is provided which can be applied to determine retrofit potential in single-family residences, mobile homes, multifamily residences, and nonresidential buildings. Case studies in Albuquerque, New Mexico, are given as examples. Guidelines are provided for evaluating the economic benefits of a retrofit program through benefit-cost analysis and economic base studies at the city and neighborhood levels. Also included are approaches to community outreach, detailing how to get started, how to gain local support, and examples of successful programs throughout the US. The need for financing, the development of a local strategy, public and private financing techniques, and community energy service organizations are examined. In addition to the Albuquerque case studies, a brief technology characterization, heat-loss calculations, economic tools, and a list of resources are appended.

Barber, V; Mathews, R

1982-02-01T23:59:59.000Z

434

Moving Bed, Granular Bed Filter Development Program: Option 1, Component Test Facility. Task 3, Test plan  

SciTech Connect (OSTI)

In the base contract, Combustion Power Co. developed commercial designs for a moving granular-bed filter (GBF). The proposed filter is similar to previous designs in terms of its shape and method of filtration. The commercial designs have scaled the filter from a 5 ft diameter to as large as a 20 ft diameter filter. In Task 2 of the Moving Bed-Granular Filter Development Program, all technical concerns related to the further development of the filter are identified. These issues are discussed in a Topical Report which has been issued as part of Task 2. Nineteen issues are identified in this report. Along with a discussion of these issues are the planned approaches for resolving each of these issues. These issues will be resolved in either a cold flow component test facility or in pilot scale testing at DOE`s Power System Development Facility (PSDF) located at Southem Company Services` Wilsonville facility. Task 3 presents a test plan for resolving those issues which can be addressed in component test facilities. The issues identified in Task 2 which will be addressed in the component test facilities are: GBF scale-up; effect of filter cone angle and sidewall materials on medium flow and ash segregation; maximum gas filtration rate; lift pipe wear; GBF media issues; mechanical design of the gas inlet duct; and filter pressure drop. This document describes a test program to address these issues, with testing to be performed at Combustion Power Company`s facility in Belmont, California.

Haas, J.C.; Purdhomme, J.W.; Wilson, K.B.

1994-04-01T23:59:59.000Z

435

[Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan]. Revision 4  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

Not Available

1992-06-01T23:59:59.000Z

436

[Uranium Mill Tailings Remedial Action Project Office Quality Assurance Program Plan  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office (UMTRA PO) directs the overall project. Since these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA PO shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan.

Not Available

1992-06-01T23:59:59.000Z

437

Overheads, Safety Analysis and Engineering FY 1995 Site Support Program Plan WBS 6.3.5  

SciTech Connect (OSTI)

The Safety Analysis & Engineering (SA&E) department provides core competency for safety analysis and risk documentation that supports achievement of the goals and mission as described in the Hanford Mission Plan, Volume I, Site Guidance (DOE-RL 1993). SA&E operations are integrated into the programs that plan and conduct safe waste management, environmental restoration, and operational activities. SA&E personnel are key members of task teams assigned to eliminate urgent risks and inherent threats that exist at the Hanford Site. Key to ensuring protection of public health and safety, and that of onsite workers, are the products and services provided by the department. SA&E will continue to provide a leadership role throughout the DOE complex with innovative, cost-effective approaches to ensuring safety during environmental cleanup operations. The SA&E mission is to provide support to direct program operations through safety analysis and risk documentation and to maintain an infrastructure responsive to the evolutionary climate at the Hanford Site. SA&E will maintain the appropriate skills mix necessary to fulfill the customers need to conduct all operations in a safe and cost-effective manner while ensuring the safety of the public and the onsite worker.

DiVincenzo, E.P.

1994-09-27T23:59:59.000Z

438

OTEC-1 Power System Test Program: test plan for first deployment  

SciTech Connect (OSTI)

This report describes in detail all tests planned for the first eight-month deployment of OTEC-1, a test facility constructed by the US Department of Energy in order to test heat exchangers for closed-cycle power plants using ocean thermal energy. Tests to be performed during the first-deployment period are aimed primarily at determining (1) the effectiveness of countermeasures in preventing biofouling of the heat exchanters, (2) the extent of environmental impacts associated with operation of an OTEC facility, and (3) the performance of a 1-MWe, titanium shell-and-tube evaporator and condenser pair. The condenser to be tested has plain tubes, and the evaporator employs the Linde High Flux surface on the working-fluid (ammonia) side to enhance the heat-transfer rate. This plan provides a statement of the objectives and priorities of the test program, describes the test equipment, gives a detailed account of all tests to be performed and the test schedule, and discusses provisions for management of the test program.

None

1980-03-01T23:59:59.000Z

439

Performance Demonstration Program Plan for RCRA Constituent Analysis of Solidified Wastes  

SciTech Connect (OSTI)

The Performance Demonstration Program (PDP) for Resource Conservation and Recovery Act (RCRA) constituents distributes test samples for analysis of volatile organic compounds (VOCs), semivolatile organic compounds (SVOCs), and metals in solid matrices. Each distribution of test samples is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD; DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department. The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the RCRA PDP. Participating laboratories demonstrate acceptable performance by successfully analyzing single- blind performance evaluation samples (subsequently referred to as PDP samples) according to the criteria established in this plan. PDP samples are used as an independent means to assess laboratory performance regarding compliance with the WAP quality assurance objectives (QAOs). The concentrations of analytes in the PDP samples address levels of regulatory concern and encompass the range of concentrations anticipated in waste characterization samples. The WIPP requires analyses of homogeneous solid wastes to demonstrate compliance with regulatory requirements. These analyses must be performed by laboratories that demonstrate acceptable performance in this PDP. These analyses are referred to as WIPP analyses, and the samples on which they are performed are referred to as WIPP samples. Participating laboratories must analyze PDP samples using the same procedures used for WIPP samples.

Carlsbad Field Office

2006-09-21T23:59:59.000Z

440

The DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion  

SciTech Connect (OSTI)

The DOE-EM Office of Engineering and Technology is responsible for implementing EM’s international cooperative program. The Office of Engineering and Technology’s international efforts are aimed at supporting EM’s mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute (KRI) and the SIA Radon Institute in Russia and the Ukraine’s International Radioecology Laboratory (IRL). Additionally, a task was recently completed with the Nuclear Engineering Technology Institute (NETEC) in South Korea. The objectives of these collaborations were to explore issues relating to high-level waste and to investigate technologies that could be leveraged to support EM site cleanup needs. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the International Program. A collaborative project with Russian Electrotechnical University is underway to evaluate CCIM control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09

Gerdes, Kurt D.; Han, Ana M.; Marra, James C.; Fox, Kevin M.; Peeler, David K.; Smith, Michael E.; Jannik, Gerald T.; Farfan, Eduardo B.; Kim, Dong-Sang; Vienna, John D.; Roach, Jay; Aloy, A. S.; Stefanovsky, S. V.; Bondarkov, M. D.; Lopukh, D. P.; Kim, Chenwoo

2009-01-15T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Electric utility system master plan  

SciTech Connect (OSTI)

This publication contains the electric utility system plan and guidelines for providing adequate electric power to the various facilities of Lawrence Livermore National Laboratory in support of the mission of the Laboratory. The topics of the publication include general information on the current systems and their operation, a planning analysis for current and future growth in energy demand, proposed improvements and expansions required to meet long range site development and the site`s five-year plan.

Erickson, O.M.

1992-10-01T23:59:59.000Z

442

Duplicity (2009) The film opens five years before the present day, showing the Fourth of July celebration at the American consulate in  

E-Print Network [OSTI]

is underfoot, and Tully makes a speech that paints them as innovators defending themselves from duplicity their plans by planting evidence of them cheating the casino. In return, Tully at Burkett & Randle thanks, Partiz was used as the bait, Bauer staged stealing the formula, and the formula never existed at all

Schenato, Luca

443

Environmental restoration plan for the transfer of surplus facilities to the Facility Transition Program at Oak Ridge National Laboratory  

SciTech Connect (OSTI)

This report will provide guidance on management, coordination, and integration of plans to transition facilities to the Facility Transition Program and activities as related to the Oak Ridge National Laboratory (ORNL) Environmental Restoration Program facilities. This report gives (1) guidance on the steps necessary for identifying ORNL surplus facilities, (2) interfaces of Surveillance and Maintenance (S and M) and Isotope Facility Deactivation program managers, (3) roles and responsibilities of the facility managers, and (4) initial S and M requirements upon acceptance into the Facility Transition Program.

NONE

1995-08-01T23:59:59.000Z

444

Tank Waste Remediation System fiscal year 1996 multi-year program plan WBS 1.1. Revision 1, Volume 1  

SciTech Connect (OSTI)

The 1995 Hanford Mission Plan specifically addresses the tank waste issue and clarifies the link with other initiatives, such as improving management practices and the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE/RL-91-31). This document captures the results of decision making regarding the application of systems engineering at the Hanford Site, external involvement policy, and site end-state goals. Section 3.5 of the Hanford Mission Plan on Decisions and Directives provides an integrating discussion of the actions of the National Environmental Policy Act (NEPA), and DOE policy, guidance, and decisions associated with binding agreements such as the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Two significant components of the Hanford Mission Plan 1994 planning basis are (1) the decisions regarding the disposition of onsite material inventory, and the key programs and interfaces to accomplish this; and (2) the Program Interface Issues section, which identified issues that stretch across program boundaries.

NONE

1995-09-01T23:59:59.000Z

445

National conference on integrated resource planning: Proceedings  

SciTech Connect (OSTI)

Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

Not Available

1991-01-01T23:59:59.000Z

446

National conference on integrated resource planning: Proceedings  

SciTech Connect (OSTI)

Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers` short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners` (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; key regulatory issued facing gas utilities during the next five years.

Not Available

1991-12-31T23:59:59.000Z

447

Management and overview Quality Assurance Program Plan. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Office (DOE/ UMTRA-PO) is the US Department of Energy (DOE) Albuquerque Operations Office (AL) organization charged with the responsibility of managing and coordinating the activities of the various participating organizations and support contractors working on the UMTRA Project. This Quality Assurance Program Plan (QAPP) describes how the DOE/UMTRA-PO, as assisted by the Technical Assistance Contractor (TAC), performs the quality assurance (QA) aspects of managing and coordinating UMTRA Project activities. This QAPP was developed to comply with DOE Order 5700.6A, August, 1981, and AL Order 5700.6B, April, 1984, which contain the criteria applicable to Project QA activities.

Not Available

1986-08-01T23:59:59.000Z

448

Safeguards and Security FY 1996 Program Plan: WBS 6.6  

SciTech Connect (OSTI)

The Safeguards and Security (SAS) Program is based upon integrity, competence and innovation in the protection of the public and Hanford resources through: (1) outstanding assistance, oversight, education, and counsel to their customers to ensure the protection of the public, site personnel, assets, and information; (2) value-added and cost-effective solutions to Hanford issues; and (3) risk management techniques to ensure effective asset protection, site accessibility, and the flexibility to adapt to changing customer needs. This plan is divided into two parts: overview and SAS WBS (work breakdown structure) dictionary sheets. The overview is divided into vision and mission, goals and objectives, assumptions and priorities, milestones, and a summary. The SAS WBS dictionary sheets are divided into department overhead, general and administrative, sitewide support, Hanford patrol, traffic safety, and locksmith services.

Lee, F.D.

1995-08-01T23:59:59.000Z

449

Summary report on the Solar Consumer Assurance Network (SOLCAN) Program Planning Task in the southern region  

SciTech Connect (OSTI)

The goal of the SOLCAN Program Planning Task is to assist in the development, at the state and local levels, of consumer assurance approaches that will support the accelerated adoption and effective use of new products promoted by government incentives to consumers to meet our nation's energy needs. The task includes state-conducted evaluations and state SOLCAN meetings to identify consumer assurance mechanisms, assess their effectiveness, and identify and describe alternative means for strengthening consumer and industry assurance in each state. Results of the SOLCAN process are presented, including: a Solar Consumer Protection State Assessment Guide; State Solar Consumer Assurance Resources for Selected States; State Solar Consumer Protection Assessment Interviews for Florida; and state SOLCAN meeting summaries and participants. (LEW)

Browne, M. B. [comp.] [comp.

1981-03-15T23:59:59.000Z

450

The RERTR (Reduced Enrichment Research and Test Reactor) Program: Progress and plans  

SciTech Connect (OSTI)

The progress of the Reduced Enrichment Research and Test Reactor (RERTR) Program is described. After a brief summary of the results which the RERTR Program, in collaboration with its many international partners, had achieved by the end of 1986, the activities, results, and new developments which occurred in 1987 are reviewed. Irradiation of the second miniplate series, concentrating on U/sub 3/Si/sub 2/-Al and U/sub 3/Si-Al fuels, was completed and postirradiation examinations were performed on many of its miniplates. The whole-core ORR demonstration with U/sub 3/Si/sub 2/-Al fuel at 4.8 g U/cm/sup 3/ was completed at the end of March with excellent results and with 29 elements estimated to have reached at least 40% average burnup. Good progress was made in the area of LEU usage for the production of fission /sup 99/Mo, and in the coordination of safety evaluations related to LEU conversions of US university reactors. Planned activities include testing and demonstrating advanced fuels intended to allow use of reduced enrichment uranium in very-high-performance reactors. Two candidate fuels are U/sub 3/Si-Al with 19.75% enrichment and U/sub 3/Si/sub 2/-Al with 45% enrichment. Demonstration of these fuels will include irradiation of full-size elements and, possibly, a full-core demonstration. Achievement of the final program goals is still projected for 1990. This progress could not have been possible without the close international cooperation which has existed from the beginning, and which is essential to the ultimate success of the RERTR Program.

Travelli, A.

1987-01-01T23:59:59.000Z

451

B.Sc. Specialization in Planning 2013-2014 Students should have their program approved by their Program Advisor every year.  

E-Print Network [OSTI]

250 Natural Resources and Environmental Management _______ *6 Open options (See Note 2B.Sc. Specialization in Planning 2013-2014 Students should have their program approved Time _______ ENGL 1xx or WRS 1xx _______ ENGL 1xx or WRS 1xx _______ HGP 100 Cultures, Landscapes

Machel, Hans

452

Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program  

SciTech Connect (OSTI)

EG&G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory`s (INEL`s) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG&G Idaho is responsible concerning the INEL WETP. Even though EG&G Idaho has no responsibility for the work that ANL-W is performing, EG&G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and efficiently completing the requirements for WETP.

Connolly, M.J.; Sayer, D.L.

1993-11-01T23:59:59.000Z

453

Status of the RERTR program: overview, progress and plans. [Reduced Enrighment Research and Test Reactor  

SciTech Connect (OSTI)

The status of the US Reduced Enrichment Research and Test Reactor (RERTR) Program is reviewed. After a summary of the accomplishments which the RERTR Program had achieved by the end of 1984 with its many international partners, emphasis is placed on the progress achieved during 1985 and on current plans and schedules. A new miniplate series, concentrating on U/sub 3/Si/sub 2/-Al and U/sub 3/Si-Al fuels, was fabricated and is well into irradiation. The whole-core ORR demonstration is scheduled to begin in November 1985, with U/sub 3/Si/sub 2/-Al fuel at 4.8 g U/cm/sup 3/. Altogether, 921 full-size test and prototype elements have been ordered for fabrication with reduced enrichment and the new technologies. Qualification of U/sub 3/Si-Al fuel with approx.7 g U/cm/sup 3/ is still projected for 1989. This progress could not have been achieved without the close international cooperation which has existed since the beginning, and whose continuation and intensification will be essential to the achievement of the long-term RERTR goals.

Travelli, A.

1985-01-01T23:59:59.000Z

454

Current Progress and Future Plans for the DOE Office of Environmental Management International Program  

SciTech Connect (OSTI)

The U.S. Department of Energy's (DOE) Office of Environmental Management (EM) has collaborated with various international institutes for many years on radioactive waste management challenges of mutual concern. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute and the SIA Radon Institute in Russia and the Ukraine's International Radioecology Laboratory to explore issues related to high-level waste and to investigate experience and technologies that could support DOE-EM site cleanup needs. Specific initiatives include: - Application of the Cold Crucible Induction Heated Melter to DOE Wastes - SIA Radon and Savannah River National Laboratory; - Improved Solubility and Retention of Troublesome Components in SRS and Hanford Waste Glasses - Khlopin Radium Institute, Pacific Northwest National Laboratory and Savannah River National Laboratory; - Long-term Impacts from Radiation/Contamination within the Chernobyl Exclusion Zone, International Radioecology Laboratory and Savannah River National Laboratory. This paper provides an overview of the status of the current International Program task activities. The paper will also provide insight into the future direction for the program. Specific ties to the current DOE-EM technology development multi-year planning effort will be highlighted as well as opportunities for future international collaborations. (authors)

Gerdes, K.D. [Office of Engineering and Technology, Office of Environmental Management, U.S. Department of Energy, Washington, DC (United States); Marra, J. C.; Peeler, D.K.; Harbour, M.J.J.R.; Fox, K.M. [Savannah River National Laboratory, Aiken, SC (United States); Vienna, J.D. [Pacific Northwest National Laboratory, Richland, WA (United States); Aloy, A.S. [Khlopin Radium Institute, St. Petersburg (Russian Federation); Stefanovsky, S.V. [SIA Radon, Moscow (Russian Federation); Bondarkov, M.D. [International Radioecology Laboratory, Slavutych (Ukraine)

2008-07-01T23:59:59.000Z

455

CURRENT PROGRESS AND FUTURE PLANS FOR THE DOE OFFICE OF ENVIRONMENTAL MANAGEMENT INTERNATIONAL PROGRAM  

SciTech Connect (OSTI)

The U.S. Department of Energy's (DOE) Office of Environmental Management (EM) has collaborated with various international institutes for many years on radioactive waste management challenges of mutual concern. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute and the SIA Radon Institute in Russia and the Ukraine's International Radioecology Laboratory to explore issues related to high-level waste and to investigate experience and technologies that could support DOE-EM site cleanup needs. Specific initiatives include: (1) Application of the Cold Crucible Induction Heated Melter to DOE Wastes--SIA Radon and Savannah River National Laboratory; (2) Improved Solubility and Retention of Troublesome Components in SRS and Hanford Waste Glasses--Khlopin Radium Institute, Pacific Northwest National Laboratory and Savannah River National Laboratory; and (3) Long-term Impacts from Radiation/Contamination within the Chernobyl Exclusion Zone--International Radioecology Laboratory and Savannah River National Laboratory. This paper provides an overview of the status of the current International Program task activities. The paper will also provide insight into the future direction for the program. Specific ties to the current DOE-EM technology development multi-year planning effort will be highlighted as well as opportunities for future international collaborations.

Marra, J; Kurt D Gerdes, K; David Peeler, D; John Harbour, J; Kevin Fox, K

2007-11-16T23:59:59.000Z

456

BROOKHAVEN NATIONAL LABORATORY INSTITUTIONAL PLAN FY2003-2007.  

SciTech Connect (OSTI)

This document presents the vision for Brookhaven National Laboratory (BNL) for the next five years, and a roadmap for implementing that vision. Brookhaven is a multidisciplinary science-based laboratory operated for the U.S. Department of Energy (DOE), supported primarily by programs sponsored by the DOE's Office of Science. As the third-largest funding agency for science in the U.S., one of the DOE's goals is ''to advance basic research and the instruments of science that are the foundations for DOE's applied missions, a base for U.S. technology innovation, and a source of remarkable insights into our physical and biological world, and the nature of matter and energy'' (DOE Office of Science Strategic Plan, 2000 http://www.osti.gov/portfolio/science.htm). BNL shapes its vision according to this plan.

NONE

2003-06-10T23:59:59.000Z

457

Five year report on the medical follow up of Marshallese receiving special medical care related to 1954 Bravo fallout radiation (January 1992--1996)  

SciTech Connect (OSTI)

This is the 17th and final report of the Marshall Islands Medical Program as carried out by the Brookhaven National Laboratory (BNL). The purpose of these publications has been to provide information on the medical status of 253 Marshallese exposed to radiation fallout in 1954. The medical program fulfills a commitment to disclose unique medical information relevant to public health. Details of the Bravo thermonuclear accident that caused the exposure have been published. A 1955 article in the Journal of the American Medical Association, which described the acute medical effects on the population that required special medical care, remains a definitive and relevant description of events. Marshallese participation in this Congressionally mandated program is voluntary. Throughout the 44 years of the program, each participating individual`s relevant medical findings, laboratory data, disease morbidity, and mortality have been published in the BNL reports in a manner preserving patient confidentiality. In each report, there has been an attempt to interpret these findings and to infer the role of radiation exposure in their development. An equally important aspect of the reports has been the presentation of data that allows for analyses of the medical consequences of the Marshallese exposure.

Vaswani, A.N.; Howard, J.E.

1999-06-01T23:59:59.000Z

458

Special initiatives FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP) WBS 5.0  

SciTech Connect (OSTI)

The Special Initiatives mission supports programmatic requests for service to DOE offices, other organizations and agencies. These requests can include the following: Supporting priority DOE initiatives; Researching special programs; Studying locating new activities at the Hanford Site; Producing specialty materials; Providing consulting support to other sites; Managing a broad spectrum of US and international test programs.

Jekel, R.A.

1994-09-01T23:59:59.000Z

459

B.S. in Chemical Science The Chemical Science degree is designed for students who plan programs in fields  

E-Print Network [OSTI]

B.S. in Chemical Science The Chemical Science degree is designed for students who plan programs, and Geology. In addition, Chemical Science can be a valuable major for those interested in business and law. This degree is not intended as a chemical preparation for people who wish to do work directly in Chemistry

McQuade, D. Tyler

460

Advanced energy design and operation technologies research: Recommendations for a US Department of Energy multiyear program plan  

SciTech Connect (OSTI)

This document describes recommendations for a multiyear plan developed for the US Department of Energy (DOE) as part of the Advanced Energy Design and Operation Technologies (AEDOT) project. The plan is an outgrowth of earlier planning activities conducted for DOE as part of design process research under the Building System Integration Program (BSIP). The proposed research will produce intelligent computer-based design and operation technologies for commercial buildings. In this document, the concept is explained, the need for these new computer-based environments is discussed, the benefits are described, and a plan for developing the AEDOT technologies is presented for the 9-year period beginning FY 1989. 45 refs., 37 figs., 9 tabs.

Brambley, M.R.; Crawley, D.B.; Hostetler, D.D.; Stratton, R.C.; Addision, M.S.; Deringer, J.J.; Hall, J.D.; Selkowitz, S.E.

1988-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Yakima Tributary Access and Habitat Program : Action Plan Final Report 2002.  

SciTech Connect (OSTI)

This report covers activities conducted by the Yakima Tributary Access and Habitat Program under Bonneville Power Administration (BPA) grant project No. 2002-025-00 for fiscal year 2002. The Yakima Tributary Access and Habitat Program (YTAHP, Program) was organized to restore salmonid passage to Yakima tributaries that historically supported salmonids and improve habitat in areas where access is restored. Specifically, this program is designed to (a) screen unscreened diversion structures to prevent fish entrainment into artificial waterways; (b) provide for fish passage at man-made barriers, such as diversion dams, culverts, siphons and bridges; and (c) provide information and assistance to landowners interested in to contributing to the improvement of water quality, water reliability and stream habitat. The YTAHP developed from a number of groups actively engaged in watershed management, and/or habitat restoration within the Yakima River Basin. These groups include the Washington State Fish and Wildlife (WDFW), Kittitas County Conservation District (KCCD), North Yakima Conservation District (NYCD), Kittitas County Water Purveyors (KCWP), and Ahtanum Irrigation District (AID). The US Bureau of Reclamation (Reclamation) and Yakama Nation (YN) both participated in the development of the objectives of YTAHP. Other entities that will be involved during permitting or project review may include the YN, the federal Natural Resources Conservation Service (NRCS), the US Fish and Wildlife Service (USFWS), the National Marine Fisheries Service (NMFS), and US Army Corps of Engineers (COE). Achievements of YTAHP with BPA Action Plan funding during FY 2002 were to: (1) Establish contracts with RC&D and YTAHP participants. (2) Determine contract mechanism for MWH engineering services. (3) Provide engineering designs and services for 11 early action projects, including inverted siphons, pump and gravity diversion screening, diversion metering, rock weirs for improved fish passage, headgates and fishways. These designs were used to submit for project implementation funding through the WA Salmon Recovery Funding Board. (4) Complete 6 early action projects on Ahtanum Creek--One gravity diversion was replaced with a pump and pump end screen and 5 pump end screens were installed. (5) Conduct two topographic surveys--For the City of Yakima on the Fruitvale diversion for the North Yakima Conservation District to support the installation of a pumping plant which would eliminate the need to divert directly from the Naches River and build the gravel berm each year during low flows. For the Taylor Ditch system for the North Yakima Conservation District to support as feasibility of opening the ditch for habitat and at the same time maintaining irrigation deliveries. (6) Procure materials for use in future YTAHP projects, including siphon pipe, delivery pipe, rock, screens, and water meters. These materials will act as match and support the completion of these subsequent YTAHP projects. Overall, with broad agency support and Action Plan funding through BPA, the YTAHP has achieved substantial enhancements that support aquatic species and which will leverage subsequent work through engineering designs and materials. The program was also able to establish the personnel and equipment support for beginning the stream assessment process on tributaries in Yakima and Kittitas Counties. Completion of this year's effort has provided significant inroads to working on the private lands in two counties which will be vital to future efforts by YTAHP and others to protect and enhance Yakima River Basin habitat.

Myra, David (South Central Washington Resource Conservation and Development Council, Ellensburg, WA); Ready, Carol A. (Kittitas County Water Purveyors, Ellensburg, WA)

2003-04-01T23:59:59.000Z

462

Integrated Program of Experimental Diagnostics at the NNSS: An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability  

SciTech Connect (OSTI)

This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories’ (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3?year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

NSTec Mission and Projects Division

2010-09-30T23:59:59.000Z

463

Non-Traditional Business Plan - Developing Sustainable Programs Related to Entrepreneurial Opportunities within a Government Contractor  

E-Print Network [OSTI]

to be used in creating a strategic plan. Strategic Plan – Aerospace Plant H has a detailed strategic plan that is updated annually to reflect any changes to the business. It is the objective of this section to augment the existing strategic plan... and scientists engaged in the latest technologies. The Plant created a business development department that looked at creating partnerships with other government agencies, other industries, and universities to utilize our manufacturing prowess to help define...

Helm, William A.

2007-12-14T23:59:59.000Z

464

(Application of the principles of environmental impact assessment to policy, plans, and programs)  

SciTech Connect (OSTI)

A proposal to study the application of the principles of EIA to policy, plans, and programs was submitted by the US Environmental Protection Agency (US EPA) to the Senior Advisors on Environmental and Water Problems of the United Nations Economic Commission. Upon approval, US EPA asked Oak Ridge National Laboratory (ORNL) to support its efforts as lead country on an international task force. Representatives from Austria, Canada, Finland, Norway, Poland, Sweden, and the United Kingdom attended the first meeting; additional countries are expected to participate at the next meeting. The administrative/legal setting for EIA in each country was reviewed. The objectives of the task force were defined, and issues related to the application of EIA at the policy level were discussed. The investigation will focus on a review and summary of case studies to determine applicable methods and approaches from which conclusions can be drawn and recommendations can be made. ORNL is responsible for overall project management, including development of the report.

Sigal, L.L.

1990-06-29T23:59:59.000Z

465

Performance demonstration program plan for RCRA constituent analysis of solidified wastes  

SciTech Connect (OSTI)

Performance Demonstration Programs (PDPS) are designed to help ensure compliance with the Quality Assurance Objectives (QAOs) for the Waste Isolation Pilot Plant (WIPP). The PDPs are intended for use by the Department of Energy (DOE) Carlsbad Area Office (CAO) to assess and approve the laboratories and other measurement facilities supplying services for the characterization of WIPP TRU waste. The PDPs may also be used by CAO in qualifying laboratories proposing to supply additional analytical services that are required for other than waste characterization, such as WIPP site operations. The purpose of this PDP is to test laboratory performance for the analysis of solidified waste samples for TRU waste characterization. This performance will be demonstrated by the successful analysis of blind audit samples of simulated, solidified TRU waste according to the criteria established in this plan. Blind audit samples (hereinafter referred to as PDP samples) will be used as an independent means to assess laboratory performance regarding compliance with the QAOs. The concentration of analytes in the PDP samples will address levels of regulatory concern and will encompass the range of concentrations anticipated in actual waste characterization samples. Analyses that are required by the WIPP to demonstrate compliance with various regulatory requirements and which are included in the PDP must be performed by laboratories that demonstrate acceptable performance in the PDP. These analyses are referred to as WIPP analyses and the samples on which they are performed are referred to as WIPP samples for the balance of this document.

NONE

1995-06-01T23:59:59.000Z

466

Generation IV Nuclear Energy Systems Ten-Year Program Plan Fiscal Year 2005, Volume 1  

SciTech Connect (OSTI)

As reflected in the U.S. ''National Energy Policy'', nuclear energy has a strong role to play in satisfying our nation's future energy security and environmental quality needs. The desirable environmental, economic, and sustainability attributes of nuclear energy give it a cornerstone position, not only in the U.S. energy portfolio, but also in the world's future energy portfolio. Accordingly, on September 20, 2002, U.S. Energy Secretary Spencer Abraham announced that, ''The United States and nine other countries have agreed to develop six Generation IV nuclear energy concepts''. The Secretary also noted that the systems are expected to ''represent significant advances in economics, safety, reliability, proliferation resistance, and waste minimization''. The six systems and their broad, worldwide research and development (R&D) needs are described in ''A Technology Roadmap for Generation IV Nuclear Energy Systems'' (hereafter referred to as the Generation IV Roadmap). The first 10 years of required U.S. R&D contributions to achieve the goals described in the Generation IV Roadmap are outlined in this Program Plan.

None

2005-03-01T23:59:59.000Z

467

Subbasin Assessment Template for the Northwest Power Planning Council's Fish and Wildlife Program  

E-Print Network [OSTI]

FINAL 1 Subbasin Assessment Template for the Northwest Power Planning Council's Fish and Wildlife progress. Subbasin assessments provide technical information upon which subbasin plans and other planning but are separate and distinct technical exercises. Assessments help to estimate the resource potential of each

468

Five-year Local Control in a Phase II Study of Hypofractionated Intensity Modulated Radiation Therapy With an Incorporated Boost for Early Stage Breast Cancer  

SciTech Connect (OSTI)

Purpose: Conventional radiation fractionation of 1.8-2 Gy per day for early stage breast cancer requires daily treatment for 6-7 weeks. We report the 5-year results of a phase II study of intensity modulated radiation therapy (IMRT), hypofractionation, and incorporated boost that shortened treatment time to 4 weeks. Methods and Materials: The study design was phase II with a planned accrual of 75 patients. Eligibility included patients aged {>=}18 years, Tis-T2, stage 0-II, and breast conservation. Photon IMRT and an incorporated boost was used, and the whole breast received 2.25 Gy per fraction for a total of 45 Gy, and the tumor bed received 2.8 Gy per fraction for a total of 56 Gy in 20 treatments over 4 weeks. Patients were followed every 6 months for 5 years. Results: Seventy-five patients were treated from December 2003 to November 2005. The median follow-up was 69 months. Median age was 52 years (range, 31-81). Median tumor size was 1.4 cm (range, 0.1-3.5). Eighty percent of tumors were node negative; 93% of patients had negative margins, and 7% of patients had close (>0 and <2 mm) margins; 76% of cancers were invasive ductal type: 15% were ductal carcinoma in situ, 5% were lobular, and 4% were other histology types. Twenty-nine percent of patients 29% had grade 3 carcinoma, and 20% of patients had extensive in situ carcinoma; 11% of patients received chemotherapy, 36% received endocrine therapy, 33% received both, and 20% received neither. There were 3 instances of local recurrence for a 5-year actuarial rate of 2.7%. Conclusions: This 4-week course of hypofractionated radiation with incorporated boost was associated with excellent local control, comparable to historical results of 6-7 weeks of conventional whole-breast fractionation with sequential boost.

Freedman, Gary M., E-mail: Gary.Freedman@uphs.upenn.edu [Radiation Oncology, University of Pennsylvania, Philadelphia, Pennsylvania (United States); Anderson, Penny R. [Department of Radiation Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Radiation Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Bleicher, Richard J. [Department of Surgical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Surgical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Litwin, Samuel; Li Tianyu [Department of Biostatistics, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Biostatistics, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Swaby, Ramona F. [Department of Medical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Medical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Ma, Chang-Ming Charlie; Li Jinsheng [Department of Radiation Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Radiation Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Sigurdson, Elin R. [Department of Surgical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Surgical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States); Watkins-Bruner, Deborah [School of Nursing, Emory University, Atlanta, Georgia (United States)] [School of Nursing, Emory University, Atlanta, Georgia (United States); Morrow, Monica [Department of Surgical Oncology, Memorial Sloan-Kettering Cancer Center, New York, New York (United States)] [Department of Surgical Oncology, Memorial Sloan-Kettering Cancer Center, New York, New York (United States); Goldstein, Lori J. [Department of Medical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)] [Department of Medical Oncology, Fox Chase Cancer Center, Philadelphia, Pennsylvania (United States)

2012-11-15T23:59:59.000Z

469

Spent nuclear fuels project: FY 1995 multi-year program plan, WBS {number_sign}1.4  

SciTech Connect (OSTI)

The mission of the Spent Nuclear Fuel (SNF) program is to safely, reliably, and efficiently manage, condition, transport, and store Department of Energy (DOE)-owned SNF, so that it meets acceptance criteria for disposal in a permanent repository. The Hanford Site Spent Nuclear Fuel strategic plan for accomplishing the project mission is: Establish near-term safe storage in the 105-K Basins; Complete national Environmental Policy Act (NEPA) process to obtain a decision on how and where spent nuclear fuel will be managed on the site; Define and establish alternative interim storage on site or transport off site to support implementation of the NEPA decision; and Define and establish a waste package qualified for final disposition. This report contains descriptions of the following: Work Breakdown Structure; WBS Dictionary; Responsibility Assignment Matrix; Program Logic Diagrams; Program Master Baseline Schedule; Program Performance Baseline Schedule; Milestone List; Milestone Description Sheets; Cost Baseline Summary by Year; Basis of Estimate; Waste Type Data; Planned Staffing; and Fiscal Year Work Plan.

Denning, J.L.

1994-09-01T23:59:59.000Z

470

Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1  

SciTech Connect (OSTI)

Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

Not Available

1993-12-22T23:59:59.000Z

471

Safety and quality management and administration Fiscal Year 1995 site support program plan WBS 6.7.2.6  

SciTech Connect (OSTI)

The mission of the Emergency, Safety, and Quality Services (ESQ) management and Program Integration is to provide leadership for the ESQ Department, coordinate business management activities of the ESQ department, and the programs it supports, as well as to plan organize, direct, and control other activities that require department-wide