Powered by Deep Web Technologies
Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is...

2

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant to the requirements of Section 925 of the Energy Policy Act of 2005 (EPACT), as outlined below. This plan delineates research directions and priorities. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs.

3

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development activities for the electric transmission and distribution system. OE has prepared this program plan pursuant to the requirements of Section 925 of the Energy Policy Act of 2005 (EPACT), as outlined below. This plan delineates research directions and priorities. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs.

4

Five year research plan, 1988--1992: Energy from the earth: Geothermal energy program  

DOE Green Energy (OSTI)

Consistent with national energy policy guidance, the plan concentrates on research and development (R and D) and limits system experiments to only those necessary to stimulate industrial confidence in the validity of research findings. A key strategy element is the continuation of the government/industry partnership which is critical to successful development of geothermal technology. The primary near-term research emphasis is the extension of hydrothermal technology options for reservoir identification, reservoir analysis, hard rock penetration, and flash and binary electric plants. The advanced geothermal resources--geopressured, hot dry rock, and magma--are longer-term and higher-risk focal points, and research in these areas centers on establishing a technology base that will allow industry to make prudent and timely investment decisions with respect to the use of these resources. 13 figs.

Not Available

1988-10-01T23:59:59.000Z

5

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

SciTech Connect

China's 11th Five-Year Plan (FYP) sets an ambitious target to reduce the energy intensity per unit of gross domestic product (GDP) by 20% from 2005 to 2010 (NDRC, 2006). In the building sector, the primary energy-saving target allocated during the 11 FYP period is 100 Mtce. Savings are expected to be achieved through the strengthening of enforcement of building energy efficiency codes, existing building retrofits and heat supply system reform, followed by energy management of government office buildings and large scale public buildings, adoption of renewable energy sources. To date, China has reported that it achieved the half of the 20% intensity reduction target by the end of 2008, however, little has been made clear on the status and the impact of the building programs. There has also been lack of description on methodology for calculating the savings and baseline definition, and no total savings that have been officially reported to date. This paper intends to provide both quantitative and qualitative assessment of the key policies and programs in building sector that China has instituted in its quest to fulfill the national goal. Overall, this paper concludes that the largest improvement for building energy efficiency were achieved in new buildings; the program to improve the energy management in government and large scale public buildings are in line with the target; however the progress in the area of existing building retrofits, particularly heating supply system reform lags behind the stated goal by a large amount.

Zhou, Nan; Mcneil, Michael; Levine, Mark

2011-03-01T23:59:59.000Z

6

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

SciTech Connect

China's 11th Five-Year Plan (FYP) sets an ambitious target to reduce the energy intensity per unit of gross domestic product (GDP) by 20% from 2005 to 2010 (NDRC, 2006). In the building sector, the primary energy-saving target allocated during the 11 FYP period is 100 Mtce. Savings are expected to be achieved through the strengthening of enforcement of building energy efficiency codes, existing building retrofits and heat supply system reform, followed by energy management of government office buildings and large scale public buildings, adoption of renewable energy sources. To date, China has reported that it achieved the half of the 20% intensity reduction target by the end of 2008, however, little has been made clear on the status and the impact of the building programs. There has also been lack of description on methodology for calculating the savings and baseline definition, and no total savings that have been officially reported to date. This paper intends to provide both quantitative and qualitative assessment of the key policies and programs in building sector that China has instituted in its quest to fulfill the national goal. Overall, this paper concludes that the largest improvement for building energy efficiency were achieved in new buildings; the program to improve the energy management in government and large scale public buildings are in line with the target; however the progress in the area of existing building retrofits, particularly heating supply system reform lags behind the stated goal by a large amount.

Zhou, Nan; Mcneil, Michael; Levine, Mark

2011-03-01T23:59:59.000Z

7

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

SciTech Connect

China's 11th Five-Year Plan (FYP) sets an ambitious target to reduce the energy intensity per unit of gross domestic product (GDP) by 20% from 2005 to 2010 (NDRC, 2006). In the building sector, the primary energy-saving target allocated during the 11 FYP period is 100 Mtce. Savings are expected to be achieved through the strengthening of enforcement of building energy efficiency codes, existing building retrofits and heat supply system reform, followed by energy management of government office buildings and large scale public buildings, adoption of renewable energy sources. To date, China has reported that it achieved the half of the 20% intensity reduction target by the end of 2008, however, little has been made clear on the status and the impact of the building programs. There has also been lack of description on methodology for calculating the savings and baseline definition, and no total savings that have been officially reported to date. This paper intend to provide both quantitative and qualitative assessment of the key policies and programs in building sector that China has instituted in its quest to fulfill the national goal. Overall, this paper concludes that the largest improvement for building energy efficiency were achieved in new buildings; the program to improve the energy management in government and large scale public buildings are in line with the target; however the progress in the area of existing building retrofit particularly heat supply system reform lags the stated goal by a large amount.

Zhou, Nan; McNeil, Michael; Levine, Mark

2010-06-07T23:59:59.000Z

8

Solid-State Lighting: DOE Five Year Commercialization Support Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Information Information Resources Printable Version Share this resource Send a link to Solid-State Lighting: DOE Five Year Commercialization Support Plan to someone by E-mail Share Solid-State Lighting: DOE Five Year Commercialization Support Plan on Facebook Tweet about Solid-State Lighting: DOE Five Year Commercialization Support Plan on Twitter Bookmark Solid-State Lighting: DOE Five Year Commercialization Support Plan on Google Bookmark Solid-State Lighting: DOE Five Year Commercialization Support Plan on Delicious Rank Solid-State Lighting: DOE Five Year Commercialization Support Plan on Digg Find More places to share Solid-State Lighting: DOE Five Year Commercialization Support Plan on AddThis.com... Conferences & Meetings Presentations Publications Webcasts Videos

9

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

of Architectural Energy-Saving in China. ” http://Assessment of Building Energy- Saving Policies and Programsi Assessment of Building Energy-Saving Policies and Programs

Zhou, Nan

2011-01-01T23:59:59.000Z

10

EM Five-Year Plan (FY2008 - FY2012)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lawrence Berkeley National Laboratory (LBNL) is not included in DOE-EM Five Year Plan FY 2008 - FY 2012. LBNL site is expected to be transferred to National Nuclear Security...

11

Industrial sector energy conservation programs in the People`s Republic of China during the seventh five-year plan (1986--1990)  

Science Conference Proceedings (OSTI)

The impetus at the national level to invest in energy conservation is quite strong and has long been reflected not only in official pronouncements, but also in the investments and organizational activities of the Chinese government. In the early 1980s the central government began a program of direct investments in industrial energy conservation that continues to the present. In addition, concurrently established governmental and quasi-governmental agencies have pursued conservation through administrative and educational measures. In Section 2 of this paper the authors outline the policies and institutions that supported China`s program of energy conservation investments in the Sixth and Seventh Five-Year Plans (FYPs) (1981--1985 and 1986--1990). In Section 3 they describe examples of the types of conservation projects pursued in four industrial subsectors: ferrous metals manufacturing; non-ferrous metals mining and manufacturing; chemicals manufacturing; and building materials manufacturing. Section 4 presents a simple methodology for comparing the costs of energy conservation to those of energy supply. Further discussion points out the applicability and limitations of this methodology to State Planning Commission published statistical material on the overall results of energy conservation investments. Though problematic, such analysis indicates that energy conservation investments were probably substantially cheaper than investments in equivalent energy supply would have been. They end with a discussion of some of the difficulties encountered in carrying out the conservation investment programs.

Liu Zhiping [State Planning Commission, Beijing (China). Energy Research Inst.; Sinton, J.E.; Yang Fuqiang; Levine, M.D.; Ting, M.K. [Lawrence Berkeley Lab., CA (United States)

1994-09-01T23:59:59.000Z

12

Collaboration on DIII-D Five Year Plan  

Science Conference Proceedings (OSTI)

This document summarizes Lawrence Livermore National Laboratory's (LLNL) plan for fusion research on the DIII-D Tokamak, located at General Atomics (GA) in San Diego, California, in the time period FY04-FY08. This document is a companion document to the DIII-D Five-Year Program Plan; which hereafter will be referred to as the ''D3DPP''. The LLNL Collaboration on DIII-D is a task-driven program in which we bring to bear the full range of expertise needed to complete specific goals of plasma science research on the DIII-D facility. This document specifies our plasma performance and physics understanding goals and gives detailed plans to achieve those goals in terms of experimental leadership, code development and analysis, and diagnostic development. Our program is designed to be consistent with the long-term mission of the DIII-D program as documented in the D3DPP. The overall DIII-D Program mission is ''to establish the scientific basis for the optimization of the tokamak approach to fusion energy production''. LLNL Magnetic Fusion Energy (MFE) supports this mission, and we contribute to two areas of the DIII-D program: divertor physics and advanced tokamak (AT) physics. We lead or contribute to the whole cycle of research: experimental planning, diagnostic development, execution of experiments, and detailed analysis. We plan to continue this style in the next five years. DIII-D has identified three major research themes: AT physics, confinement physics, and mass transport. The LLNL program is part of the AT theme: measurement of the plasma current profile, and the mass transport theme: measurement and modeling of plasma flow. In the AT area, we have focused on the measurement and modeling of the current profile in Advanced Tokamak plasmas. The current profile, and it's effect on MHD stability of the high-{beta} ''AT'' plasma are at the heart of the DIII-D program. LLNL has played a key role in the development of the Motional Stark Effect (MSE) diagnostic. Starting with a single channel, the system has grown to 40 channels with three separate systems. We have continually developed new calibration techniques, with a goal of accuracy in the magnetic field pitch angle measurements of {approx}0.1 degree. Measurements of the radial electric field E{sub r} have also been achieved. In the next five year period, GA plans on rotating one of the neutral beams so that it injects opposite to the sense of the plasma current (counter-injection). This enables two orthogonal MSE views of the neutral beam so that J(r) and E{sub r} can be obtained directly. In addition, the new views can be optimized so that increased spatial resolution will be obtained. Our plan is to install these new systems when the neutral beam is reoriented, and continue to provide high-resolution, ''state of the art'' current profile measurements for the DIII-D AT program. In the divertor physics area, our goal is the development of a model of the scrapeoff layer (SOL) and divertor plasmas which is benchmarked with data. We have identified the need for measurements of SOL flow and ion temperature. Working with GA, we are proposing a new edge Charge Exchange Recombination (CER) diagnostic. The understanding of SOL flow is important for understanding the tritium inventory problem in ITER. In addition, using plasma flow to ''entrain'' impurities in the divertor region (enabling a low density radiative divertor) is the current AT divertor heat flux control scenario. We are also augmenting our edge modeling capabilities with a coupled UEDGE (fluid code) with the BOUT (edge turbulence) code. Further work, funded through LLNL theory, is planned to develop a kinetic treatment of the edge. All of these efforts contribute to the understanding of the edge pedestal in the tokamak, an important AT and ITER topic. A secondary goal is the understanding of Edge Localized Modes (ELMs), which are also important in the ITER design, as the repetitive bursts of heat flux can cause increased erosion and damage to the divertor plates. The modeling effort, particularly the kinetic treatme

Allen, S

2003-04-01T23:59:59.000Z

13

Twenty-Five Year Site Plan FY2013 - FY2037  

SciTech Connect

Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.

Jones, William H. [Los Alamos National Laboratory

2012-07-12T23:59:59.000Z

14

Twenty-Five Year Site Plan FY2013 - FY2037  

SciTech Connect

Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also uses the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.

Jones, William H. [Los Alamos National Laboratory

2012-07-12T23:59:59.000Z

15

EM Five-Year Plan (FY 2008 - FY 2012) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Five-Year Plan (FY 2008 - FY 2012) EM Five-Year Plan (FY 2008 - FY 2012) EM Five-Year Plan (FY 2008 - FY 2012) The purpose of the EM Five Year Plan is to describe EM's planned strategies, funding and accomplishments over the next five years. This plan summarizes EM progress to date, presents EM performance measures, discusses assumptions and the EM decision-making process, and provides estimated EM funding over the FY 2008-2012 time period. Following this summary are sections that provide detailed information on each site including planned accomplishments at the target funding scenario. EM's five year planning targets are significantly different from the funding targets that appeared in the FY 2007-2011 Five Year Plan. Site planning allocations that formed the basis for the planned accomplishments

16

Energy Management: A Corporate Objective in the Five-Year Business Plan  

E-Print Network (OSTI)

This paper presents the Energy Management Program developed by the Western Electric Company. The program includes managerial accountabilities; administrative and technical activities; and a most recently implemented comprehensive five-year energy planning process. The main focus of this paper is on the energy planning process. This process is designed to (1) provide increased corporate energy direction; (2) assure that all Company locations have comprehensive energy management programs; (3) improve communications to reduce duplication of effort; (4) provide engineering effort and capital required for energy related projects, and (5) provide increased energy conservation input to the Corporate Business Plan.

Mulhern, T. A.

1982-01-01T23:59:59.000Z

17

India's 11th Five-year Plan | Open Energy Information  

Open Energy Info (EERE)

of India Sector Energy, Land Focus Area Conventional Energy, Energy Efficiency, Renewable Energy Topics Policiesdeployment programs, Background analysis Website http:...

18

Five-Year Strategic Academic Plan February 2011  

E-Print Network (OSTI)

, politics, the social impacts of technological change, environmental science and policy, human learning) are examples of academic programs that focus on social engagement and social impact in a community setting

California at Santa Cruz, University of

19

Office of Secure Transportation Twenty-Five Year Site Plan (TYSP...  

National Nuclear Security Administration (NNSA)

by the United States Department of Energy (DOE) O 430.1B Real Property Asset Management (RPAM) in conformance with the Twenty-Five Year Site Plan (TYSP) 2012. Budget data...

20

FIVE YEAR COMBINED BS-ENGINEERING / MS-MATERIALS PROGRAM  

E-Print Network (OSTI)

superalloys, or advanced CAT scanners without superconducting magnets and ceramic scintillators, etc. · Materials are often the enabling element of technological progress in all major industries in which a competitive edge in the high technology industry. · The program capitalizes on the emergence

Fabrikant, Sara Irina

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

U.S. Department of Energy clean cities five-year strategic plan.  

DOE Green Energy (OSTI)

Clean Cities is a government-industry partnership sponsored by the U.S. Department of Energy's (DOE) Vehicle Technologies Program, which is part of the Office of Energy Efficiency and Renewable Energy. Working with its network of about 100 local coalitions and more than 6,500 stakeholders across the country, Clean Cities delivers on its mission to reduce petroleum consumption in on-road transportation. In its work to reduce petroleum use, Clean Cities focuses on a portfolio of technologies that includes electric drive, propane, natural gas, renewable natural gas/biomethane, ethanol/E85, biodiesel/B20 and higher-level blends, fuel economy, and idle reduction. Over the past 17 years, Clean Cities coalitions have displaced more than 2.4 billion gallons of petroleum; they are on track to displace 2.5 billion gallons of gasoline per year by 2020. This Clean Cities Strategic Plan lays out an aggressive five-year agenda to help DOE Clean Cities and its network of coalitions and stakeholders accelerate the deployment of alternative fuel and advanced technology vehicles, while also expanding the supporting infrastructure to reduce petroleum use. Today, Clean Cities has a far larger opportunity to make an impact than at any time in its history because of its unprecedented $300 million allocation for community-based deployment projects from the American Recovery and Reinvestment Act (ARRA) (see box below). Moreover, the Clean Cities annual budget has risen to $25 million for FY2010 and $35 million has been requested for FY2011. Designed as a living document, this strategic plan is grounded in the understanding that priorities will change annually as evolving technical, political, economic, business, and social considerations are woven into project decisions and funding allocations. The plan does not intend to lock Clean Cities into pathways that cannot change. Instead, with technology deployment at its core, the plan serves as a guide for decision-making at both the national and local levels of Clean Cities over the next five years. The plan recognizes the need for flexibility and sets out a strategic direction that will build on the progress of current technologies and new opportunities presented in emerging fuels and technologies, such as hydrogen and fuel cells, as well as new niche markets such as off-road applications that build additional throughput at existing alternative fuel stations.

Cambridge Concord Associates

2011-02-15T23:59:59.000Z

22

5-1924-01-P1 FIVE-YEAR STRATEGIC PLAN FOR THE TEXAS  

E-Print Network (OSTI)

5-1924-01-P1 FIVE-YEAR STRATEGIC PLAN FOR THE TEXAS ACCELERATED PAVEMENT TEST CENTER (TXAPT The University of Texas at Austin 3208 Red River, Suite 200 Austin, Texas 78705-2650 Sponsoring Organization: Texas Department of Transportation Research and Technology Implementation Office P.O. Box 5080 Austin

Texas at Austin, University of

23

U.S. Department of Energy Clean Cities Five-Year Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy Clean Cities Five-Year Strategic Plan Reducing Petroleum Dependence in On-Road Transportation in the United States January 2011 Prepared by Cambridge Concord Associates Clean Cities Five-Year Strategic Plan, January 2011 1 Contents List of Abbreviations 3 Driving the Clean Cities Mission Forward 4 The Centrality of the Coalitions to the Success of the Clean Cities Mission 5 Executive Summary 5 Overarching Vision Maximize the Impact of Clean Cities 7 Strategic Direction Significantly Expand Clean Cities' Petroleum Reduction Efforts in the 8 Portfolio of Technologies Alternative Fuels - Electric Drive, Natural Gas, Propane Electric Drive 9 Natural Gas 13 Propane 17 Renewable Fuels - Renewable Natural Gas/Biomethane, Ethanol, Biodiesel

24

Office of Secure Transportation Twenty-Five Year Site Plan (TYSP)  

National Nuclear Security Administration (NNSA)

Secure Transportation Secure Transportation Twenty-Five Year Site Plan (TYSP) FY2013 FINAL Submitted June 29, 2012 National Nuclear Security Administration Office of Secure Transportation OST TYSP FY2013 Office of Secure Transportation Twenty-Five Year Site Plan NOTICE This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government, nor any agency thereof, nor any of their employees makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe on privately owned rights. Reference herein to any specific commercial product, process, or service by trade name,

25

Pacific Northwest and Alaska Regional Bioenergy Program : Five Year Report, 1985-1990.  

DOE Green Energy (OSTI)

This five-year report describes activities of the Pacific Northwest and Alaska Regional Bioenergy Program between 1985 and 1990. Begun in 1979, this Regional Bioenergy Program became the model for the nation's four other regional bioenergy programs in 1983. Within the time span of this report, the Pacific Northwest and Alaska Regional Bioenergy Program has undertaken a number of applied research and technology projects, and supported and guided the work of its five participating state energy programs. During this period, the Regional Bioenergy Program has brought together public- and private-sector organizations to promote the use of local biomass and municipal-waste energy resources and technologies. This report claims information on the mission, goals and accomplishments of the Regional Bioenergy Program. It describes the biomass projects conducted by the individual states of the region, and summarizes the results of the programs technical studies. Publications from both the state and regional projects are listed. The report goes on to consider future efforts of the Regional Bioenergy Program under its challenging assignment. Research activities include: forest residue estimates; Landsat biomass mapping; woody biomass plantations; industrial wood-fuel market; residential space heating with wood; materials recovery of residues; co-firing wood chips with coal; biomass fuel characterization; wood-boosted geothermal power plants; wood gasification; municipal solid wastes to energy; woodstove study; slash burning; forest depletion; and technology transfer. 9 figs., 6 tabs.

Pacific Northwest and Alaska Bioenergy Program (U.S.)

1991-02-01T23:59:59.000Z

26

Pacific Northwest and Alaska Regional Bioenergy Program : Five Year Report, 1985-1990.  

SciTech Connect

This five-year report describes activities of the Pacific Northwest and Alaska Regional Bioenergy Program between 1985 and 1990. Begun in 1979, this Regional Bioenergy Program became the model for the nation's four other regional bioenergy programs in 1983. Within the time span of this report, the Pacific Northwest and Alaska Regional Bioenergy Program has undertaken a number of applied research and technology projects, and supported and guided the work of its five participating state energy programs. During this period, the Regional Bioenergy Program has brought together public- and private-sector organizations to promote the use of local biomass and municipal-waste energy resources and technologies. This report claims information on the mission, goals and accomplishments of the Regional Bioenergy Program. It describes the biomass projects conducted by the individual states of the region, and summarizes the results of the programs technical studies. Publications from both the state and regional projects are listed. The report goes on to consider future efforts of the Regional Bioenergy Program under its challenging assignment. Research activities include: forest residue estimates; Landsat biomass mapping; woody biomass plantations; industrial wood-fuel market; residential space heating with wood; materials recovery of residues; co-firing wood chips with coal; biomass fuel characterization; wood-boosted geothermal power plants; wood gasification; municipal solid wastes to energy; woodstove study; slash burning; forest depletion; and technology transfer. 9 figs., 6 tabs.

Pacific Northwest and Alaska Bioenergy Program (U.S.)

1991-02-01T23:59:59.000Z

27

Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan  

SciTech Connect

Experience with China's 20% energy intensity improvement target during the 11th Five-Year Plan (FYP) (2006-2010) has shown the challenges of rapidly setting targets and implementing measures to meet them. For the 12th FYP (2011-2015), there is an urgent need for a more scientific methodology to allocate targets among the provinces and to track physical and economic indicators of energy and carbon saving progress. This report provides a sectoral methodology for allocating a national energy intensity target - expressed as percent change in energy per unit gross domestic product (GDP) - among China's provinces in the 12th FYP. Drawing on international experience - especially the European Union (EU) Triptych approach for allocating Kyoto carbon targets among EU member states - the methodology here makes important modifications to the EU approach to address an energy intensity rather than a CO{sub 2} emissions target, and for the wider variation in provincial energy and economic structure in China. The methodology combines top-down national target projections and bottom-up provincial and sectoral projections of energy and GDP to determine target allocation of energy intensity targets. Total primary energy consumption is separated into three end-use sectors - industrial, residential, and other energy. Sectoral indicators are used to differentiate the potential for energy saving among the provinces. This sectoral methodology is utilized to allocate provincial-level targets for a national target of 20% energy intensity improvement during the 12th FYP; the official target is determined by the National Development and Reform Commission. Energy and GDP projections used in the allocations were compared with other models, and several allocation scenarios were run to test sensitivity. The resulting allocations for the 12th FYP offer insight on past performance and offer somewhat different distributions of provincial targets compared to the 11th FYP. Recommendations for reporting and monitoring progress on the targets, and methodology improvements, are included.

Ohshita, Stephanie; Price, Lynn

2011-03-21T23:59:59.000Z

28

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

SciTech Connect

During the period 1980 to 2002, China experienced a 5% average annual reduction in energy consumption per unit of gross domestic product (GDP). The period 2002-2005 saw a dramatic reversal of the historic relationship between energy use and GDP growth: energy use per unit of GDP increased an average of 3.8% per year during this period (NBS, various years). China's 11th Five Year Plan (FYP), which covers the period 2006-2010, required all government divisions at different levels to reduce energy intensity by 20% in five years in order to regain the relationship between energy and GDP growth experienced during the 1980s and 1990s. This report provides an assessment of selected policies and programs that China has instituted in its quest to fulfill the national goal of a 20% reduction in energy intensity by 2010. The report finds that China has made substantial progress toward its goal of achieving 20% energy intensity reduction from 2006 to 2010 and that many of the energy-efficiency programs implemented during the 11th FYP in support of China's 20% energy/GDP reduction goal appear to be on track to meet - or in some cases even exceed - their energy-saving targets. It appears that most of the Ten Key Projects, the Top-1000 Program, and the Small Plant Closure Program are on track to meet or surpass the 11th FYP savings goals. China's appliance standards and labeling program, which was established prior to the 11th FYP, has become very robust during the 11th FYP period. China has greatly enhanced its enforcement of new building energy standards but energy-efficiency programs for buildings retrofits, as well as the goal of adjusting China's economic structure to reduce the share of energy consumed by industry, do not appear to be on track to meet the stated goals. With the implementation of the 11th FYP now bearing fruit, it is important to maintain and strengthen the existing energy-saving policies and programs that are successful while revising programs or adding new policy mechanisms to improve the programs that are not on track to achieve the stated goals.

Levine, Mark D.; Price, Lynn; Zhou, Nan; Fridley, David; Aden, Nathaniel; Lu, Hongyou; McNeil, Michael; Zheng, Nina; Yining, Qin; Yowargana, Ping

2010-04-28T23:59:59.000Z

29

Taking out one billion tones of carbon: the magic of China's 11thFive-Year Plan  

SciTech Connect

China's 11th Five-Year Plan (FYP) sets an ambitious targetfor energy-efficiency improvement: energy intensity of the country sgross domestic product (GDP) should be reduced by 20 percent from 2005 to2010 (NDRC, 2006). This is the first time that a quantitative and bindingtarget has been set for energy efficiency, and signals a major shift inChina's strategic thinking about its long-term economic and energydevelopment. The 20 percent energy intensity target also translates intoan annual reduction of over one billion tons of CO2 by 2010, making theChinese effort one of most significant carbon mitigation effort in theworld today. While it is still too early to tell whether China willachieve this target, this paper attempts to understand the trend inenergy intensity in China and to explore a variety of options towardmeeting the 20 percent target using a detailed endues energymodel.

Lin, Jiang; Zhou, Nan; Levine, Mark D.; Fridley, David

2007-05-01T23:59:59.000Z

30

Inspection of Nickel Alloy Welds: Results from Five Year International Program  

SciTech Connect

The U.S. Nuclear Regulatory Commission established and coordinated the international Program for the Inspection of Nickel alloy Components (PINC). The goal of PINC was to evaluate the capabilities of various nondestructive examination (NDE) techniques to detect and characterize primary water stress corrosion cracking (PWSCC) in dissimilar metal welds. Round-robin results showed that a combination of conventional and phased-array ultrasound provide the highest performance for flaw detection and depth sizing in dissimilar metal piping welds. The effective detection of flaws in bottom-mounted instrumentation penetrations by eddy current and ultrasound shows that it may be possible to reliably inspect these components in the field.

Prokofiev, Iouri; Cumblidge, Stephen E.; Doctor, Steven R.

2011-06-23T23:59:59.000Z

31

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

SciTech Connect

China's 11th Five-Year Plan (FYP) sets an ambitious target for energy-efficiency improvement: energy intensity of the country's gross domestic product (GDP) should be reduced by 20% from 2005 to 2010 (NDRC, 2006). This is the first time that a quantitative and binding target has been set for energy efficiency, and signals a major shift in China's strategic thinking about its long-term economic and energy development. The 20% energy intensity target also translates into an annual reduction of over 1.5 billion tons of CO2 by 2010, making the Chinese effort one of most significant carbon mitigation effort in the world today. While it is still too early to tell whether China will achieve this target, this paper attempts to understand the trend in energy intensity in China and to explore a variety of options toward meeting the 20% target using a detailed end-use energy model.

Zhou, Nan; Lin, Jiang; Zhou, Nan; Levine, Mark; Fridley, David

2007-07-01T23:59:59.000Z

32

Burlington Bottoms Wildlife Mitigation Site : Five-Year Habitat Management Plan, 2001-2005, 2000-2001 Progress Report.  

DOE Green Energy (OSTI)

Historically the lower Columbia and Willamette River Basins were ecologically rich in both the habitat types and the species diversity they supported. This was due in part to the pattern of floods and periodic inundation of bottomlands that occurred, which was an important factor in creating and maintaining a complex system of wetland, meadow, and riparian habitats. This landscape has been greatly altered in the past 150 years, primarily due to human development and agricultural activities including cattle grazing, logging and the building of hydroelectric facilities for hydropower, navigation, flood control and irrigation in the Columbia and Willamette River Basins. The Burlington Bottoms (BB) wetlands contains some of the last remaining bottomlands in the area, supporting a diverse array of native plant and wildlife species. Located approximately twelve miles northwest of Portland and situated between the Tualatin Mountains to the west and Multnomah Channel and Sauvie Island to the east, the current habitats are remnant of what was once common throughout the region. In order to preserve and enhance this important site, a five-year habitat management plan has been written that proposes a set of actions that will carry out the goals and objectives developed for the site, which includes protecting, maintaining and enhancing wildlife habitat for perpetuity.

Beilke, Susan G.

2001-09-01T23:59:59.000Z

33

FIVE-YEAR FINANCIAL OUTLOOK  

E-Print Network (OSTI)

Outlook) for the City of San Diego which presented a comprehensive examination of the City’s long range fiscal condition. The Financial Outlook has proven to be an important planning tool for the City of San Diego. The Outlook guided the City in establishing the fiscal year 2008 annual budget and has served throughout the year as the basis for longer term fiscal decisionmaking. The Outlook has communicated the City’s fiscal priorities along with the City’s strengths and the challenges that remain in achieving a balanced General Fund budget and fiscal health. The updated Five-Year Financial Outlook (2009-2013 Outlook) includes revised revenue and expenditure projections for fiscal years 2009 through 2013 as well as additional fiscal commitments that have emerged since the 2008-2012 Outlook was issued. Similar to the 2008-2012 Outlook, the revised revenue and expenditure estimates in the 2009-2013 Outlook are based on a variety of assumptions in the context of current and projected economic conditions. The updated Outlook not only identifies revenue and expenditure trends but also discusses risks and opportunities that affect fiscal decisions and the City’s ability to accomplish its strategic goals over the next five-year period. Those goals include: • Preservation of City services to the fullest extent possible. Fund the operations of new public facilities. • Meet contractual obligations and fund mandated programs. • Contribute the full payment of the Annual Required Contribution (ARC) for the City’s pension system. • Establish and maintain adequate General Fund reserves according to City Charter Section 91 and the City Reserve Policy recently approved by the City Council. • Address other significant financial obligations with a longer-term strategy.

Jerry Sanders; Jay M. Goldstone

2006-01-01T23:59:59.000Z

34

Five-Year Implementation Plan For Advanced Separations and Waste Forms Capabilities at the Idaho National Laboratory (FY 2011 to FY 2015)  

SciTech Connect

DOE-NE separations research is focused today on developing a science-based understanding that builds on historical research and focuses on combining a fundamental understanding of separations and waste forms processes with small-scale experimentation coupled with modeling and simulation. The result of this approach is the development of a predictive capability that supports evaluation of separations and waste forms technologies. The specific suite of technologies explored will depend on and must be integrated with the fuel development effort, as well as an understanding of potential waste form requirements. This five-year implementation plan lays out the specific near-term tactical investments in people, equipment and facilities, and customer capture efforts that will be required over the next five years to quickly and safely bring on line the capabilities needed to support the science-based goals and objectives of INL’s Advanced Separations and Waste Forms RD&D Capabilities Strategic Plan.

Not Listed

2011-03-01T23:59:59.000Z

35

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

Program: Reducing Energy Consumption of the 1000 LargestThe Challenge of Reducing Energy Consumption of the Top-10002008a. Commercial Energy Consumption Survey. Washington, DC:

Levine, Mark D.

2010-01-01T23:59:59.000Z

36

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

Collaborative Labeling and Appliance Standards Program (for household refrigerating appliances and TVs. ” Brussels:Impacts of China’s Current Appliance Standards and Labeling

Levine, Mark D.

2010-01-01T23:59:59.000Z

37

Wanaket Wildlife Area Management Plan : Five-Year Plan for Protecting, Enhancing, and Mitigating Wildlife Habitat Losses for the McNary Hydroelectric Facility.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding the enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.

Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

2001-09-01T23:59:59.000Z

38

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

and Challenges,” Energy Policy 26 (11):813-829 Sinton J. ,of US programs,” Energy Policy 31(2): 109-123. Bank ofCorresponding Measures,” Energy Policy (2009) 2054-2059 Cai

Levine, Mark D.

2010-01-01T23:59:59.000Z

39

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

Central government-level energy-saving policies or programsCentral government-level energy-saving policies or programsof government in promoting energy-savings policies and

Levine, Mark D.

2010-01-01T23:59:59.000Z

40

Iskuulpa Watershed Management Plan : A Five-Year Plan for Protecting and Enhancing Fish and Wildlife Habitats in the Iskuulpa Watershed.  

DOE Green Energy (OSTI)

The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receive credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.

Confederated Tribes of the Umatilla Indian Reservation Wildlife Program

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Program Operations Plan  

SciTech Connect

The Department of Energy's Atmospheric Chemistry Program (ACP) was initiated in 1991 to coordinate DOE's university and federal-laboratory atmospheric-chemistry research, and to focus these efforts on national and international information requirements in the atmospheric-chemistry field. This Program Operations Plan describes the structure and vision of the effort designed to fulfill these needs, and is divided into two major components. The first of these is a Strategic Plan, which outlines the ACP's rationale, objectives, and vision, and describes its products that are anticipated over a future ten-year period. Although based on realistic appraisals of goals that are attainable given the financial, material, and intellectual resources of the ACP community, this Strategic Plan does not describe these resources themselves. The second component of the Program Operations Plan, the Implementation Plan, deals directly with these resource considerations. As such it focuses on practical implementation of Strategic-Plan elements at the individual research institutions, the anticipated scientific contributions of these groups, and their coordination within the ACP. In contrast to the Strategic Plan, this Implementation Plan extends only five years into the future.

1993-04-01T23:59:59.000Z

42

Program Operations Plan. Atmospheric Chemistry Program  

SciTech Connect

The Department of Energy`s Atmospheric Chemistry Program (ACP) was initiated in 1991 to coordinate DOE`s university and federal-laboratory atmospheric-chemistry research, and to focus these efforts on national and international information requirements in the atmospheric-chemistry field. This Program Operations Plan describes the structure and vision of the effort designed to fulfill these needs, and is divided into two major components. The first of these is a Strategic Plan, which outlines the ACP`s rationale, objectives, and vision, and describes its products that are anticipated over a future ten-year period. Although based on realistic appraisals of goals that are attainable given the financial, material, and intellectual resources of the ACP community, this Strategic Plan does not describe these resources themselves. The second component of the Program Operations Plan, the Implementation Plan, deals directly with these resource considerations. As such it focuses on practical implementation of Strategic-Plan elements at the individual research institutions, the anticipated scientific contributions of these groups, and their coordination within the ACP. In contrast to the Strategic Plan, this Implementation Plan extends only five years into the future.

1993-04-01T23:59:59.000Z

43

Hydrogen: NIST WMD Five Year Plan  

Science Conference Proceedings (OSTI)

... United States transition to a hydrogen economy. ... marking requirements; (4) fuel quality standards ... competition, and facilitate economic growth and ...

2012-12-17T23:59:59.000Z

44

US Geothermal Energy Program Multiyear Plan, 1988-1992  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. This is a final report. It contains significant data on cost of power from geothermal power systems, and is of historical (history) interest in that regard. (DJE 2005)

1988-10-01T23:59:59.000Z

45

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

heating Special fund for demonstration projects of renewable energy in buildings Subsidy for demonstration projects of solar

Zhou, Nan

2010-01-01T23:59:59.000Z

46

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

retrofit in northern area district heating Special fund forbuildings that have district heating system (Wu, 2009). Thein heating load is assumed for buildings using district

Zhou, Nan

2011-01-01T23:59:59.000Z

47

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

retrofit in northern area district heating Special fund forbuildings that have district heating system (Wu, 2009). Thein heating load is assumed for buildings using district

Zhou, Nan

2010-01-01T23:59:59.000Z

48

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

China. ” Energy& Buildings 40 (12): 2121-2127. Zhou N. ,Scenarios of Commercial Building Energy Consumption inbuilding energy retrofits, and building energy control

Zhou, Nan

2011-01-01T23:59:59.000Z

49

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

China. ” Energy& Buildings 40 (12): 2121-2127. Zhou N. ,Scenarios of Commercial Building Energy Consumption inbuilding energy retrofits, and building energy control

Zhou, Nan

2010-01-01T23:59:59.000Z

50

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

conservation management in government office buildings and large-scale public buildingsPublic Buildings. Heat supply system measurement and energy conservation

Zhou, Nan

2011-01-01T23:59:59.000Z

51

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

conservation managementin government office buildings and large-scale public buildingsPublic Buildings. Heat supply system measurement and energy conservation

Zhou, Nan

2010-01-01T23:59:59.000Z

52

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

Commercial Building Energy Consumption in China. ” Energy&China Building Energy Consumption: Situation, Challenges andOverview Building energy consumption accounts for 25% of the

Zhou, Nan

2010-01-01T23:59:59.000Z

53

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

Commercial Building Energy Consumption in China. ” Energy&China Building Energy Consumption: Situation, Challenges and2. Overview Building energy consumption accounts for 25% of

Zhou, Nan

2011-01-01T23:59:59.000Z

54

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

of the inspection or energy audit are borne by the centralstatistics, performing energy audits, and certifying theMOHURD also carried out an energy audit of 768 buildings and

Zhou, Nan

2010-01-01T23:59:59.000Z

55

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

of the inspection or energy audit are borne by the centralstatistics, performing energy audits, and certifying theMOHURD also carried out an energy audit of 768 buildings and

Zhou, Nan

2011-01-01T23:59:59.000Z

56

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

include three tasks: building insulation, indoor heatingcompared to buildings without insulation. For existingbuilding design and construction enterprises and respective supervisory units are responsible for obtaining energy labeling certification, verification of construction completion and insulation

Zhou, Nan

2010-01-01T23:59:59.000Z

57

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

include three tasks: building insulation, indoor heatingcompared to buildings without insulation. For existingbuilding design and construction enterprises and respective supervisory units are responsible for obtaining energy labeling certification, verification of construction completion and insulation

Zhou, Nan

2011-01-01T23:59:59.000Z

58

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

E-Print Network (OSTI)

of Architectural Energy-Saving in China. ” http://Assessment of Building Energy- Saving Policies and Programssector, the primary energy-saving target allocated during

Zhou, Nan

2010-01-01T23:59:59.000Z

59

Solid-State Lighting: Text-Alternative Version: DOE Five Year  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE DOE Five Year Commercialization Support Plan to someone by E-mail Share Solid-State Lighting: Text-Alternative Version: DOE Five Year Commercialization Support Plan on Facebook Tweet about Solid-State Lighting: Text-Alternative Version: DOE Five Year Commercialization Support Plan on Twitter Bookmark Solid-State Lighting: Text-Alternative Version: DOE Five Year Commercialization Support Plan on Google Bookmark Solid-State Lighting: Text-Alternative Version: DOE Five Year Commercialization Support Plan on Delicious Rank Solid-State Lighting: Text-Alternative Version: DOE Five Year Commercialization Support Plan on Digg Find More places to share Solid-State Lighting: Text-Alternative Version: DOE Five Year Commercialization Support Plan on AddThis.com... Conferences & Meetings

60

NRI to Lead New Five-Year Effort to Develop Post-CMOS ...  

Science Conference Proceedings (OSTI)

NRI to Lead New Five-Year Effort to ... research program centered at leading universities in ... supports four principle university-led research centers to ...

2012-10-16T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

TURBINES U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States...

62

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SEPTEMBER 2013 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the...

63

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United...

64

LFRG Program Management Plan  

Energy.gov (U.S. Department of Energy (DOE))

The purpose of the EM  Low-Level Waste Disposal Facility Federal Review Group Program Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes,...

65

Geothermal Technologies Program Strategic Plan  

SciTech Connect

This DOE/EERE program strategic plan builds upon previous program plans and R&D direction reviews with industry representatives and other stakeholders.

2004-08-01T23:59:59.000Z

66

Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

1995-03-03T23:59:59.000Z

67

Geothermal Energy Multi-Year Program Plan, FY 1994-1998  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form. (DJE 2005)

1993-04-01T23:59:59.000Z

68

Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs  

SciTech Connect

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

69

International Photovoltaic Program Plan  

SciTech Connect

The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

1979-12-01T23:59:59.000Z

70

International Photovoltaic Program Plan  

DOE Green Energy (OSTI)

The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

1979-12-01T23:59:59.000Z

71

NASA Glenn Research Center Acoustical Testing Laboratory: Five year retrospective  

Science Conference Proceedings (OSTI)

In the five years since the NASA Glenn Research Center Acoustical Testing Laboratory (ATL) opened its doors in September

2005-01-01T23:59:59.000Z

72

ESnet Program Plan 1994  

Science Conference Proceedings (OSTI)

This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

Merola, S.

1994-11-01T23:59:59.000Z

73

SNAPSHOT Safety Program Plan  

SciTech Connect

The SNAPSHOT Safety Program, as described in this document, is therefore formulated to align safety studies performed by separate agencies and their contractors. At the present stage in program development, the plan is principally concerned with the initial SNAPSHOT flight (SNAP 10A). SNAPSHOT represents a special flight mode for the initial reactors operated in space. The flights are designed to permit early space reactor tests prior to resolving all the safety proglems that may be associated with more advanced programs. Of primary significance is that reactor operation will not be initiated until an orbit of satisfactory lifetime has been obtrained, thus ensuring the long-term decay of the fission products producted prior to re-entry.

1962-06-20T23:59:59.000Z

74

ESnet Program Plan  

Science Conference Proceedings (OSTI)

The purpose of the Energy Sciences Network (ESnet) Program Plan is to establish, demonstrate, and represent the vision and recommendations of the ESnet Steering Committee regarding ESnet directions and implementations. This document is intended to assist the Office of Energy Research and the Scientific Computing Staff in ESnet program planning and management, including ESnet prioritization and funding. This document contains general information about ESnet in terms of both the current and future needs of Energy Research programs for networking infrastructure. Some historical information about Energy Research networking is provided to afford the reader a perspective from which to evaluate the increasing utility of networking to the Energy Research community. A current ESnet description is provided in detail. ESnet is one of the world's major scientific networks, and the information contained within this document will provide an understanding of ESnet architecture and major components. ESnet provides the Energy Research community with access to many other peer level networks and a multitude of other interconnected network facilities. The reader will be provided with information concerning ESnet's connectivity and interrelationship to other networks and facilities.

Not Available

1991-03-01T23:59:59.000Z

75

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

banks, and provincial governments (all under the guidance of the Office of Energybanks, and provincial governments. The major policies on energyEnergy Investment Corporation was amalgamated into a new State Development Bank

Zhiping, L.

2010-01-01T23:59:59.000Z

76

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

oil equivalent. In this paper energy units are converted toWenji (Collected Energy Conservation Papers from the 1991Wenji (Collected Energy Conservation Papers from the 1991

Zhiping, L.

2010-01-01T23:59:59.000Z

77

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

emissions recovery, and district heating projects. The mostSEC Strengthen management work in urban district heating.Expanding district heating management systems, open up new

Zhiping, L.

2010-01-01T23:59:59.000Z

78

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

demand. The energy consumption mix i n China's chemicalenergy units are converted to tee, reflecting the dominance of coal in China's fuel mix.

Zhiping, L.

2010-01-01T23:59:59.000Z

79

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

intensity indicators referred to a single product, but at different phases of production, in terms of different types of energyEnergy Consumption Norms for Major Products (or Amounts of Work)," 1989). For example, more than 80 intensity indicators

Zhiping, L.

2010-01-01T23:59:59.000Z

80

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

furnaces and rolling mill heating ovens (Wu and Meng, 1991).and ovens, encouraging cogeneration and district heating,

Zhiping, L.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

utilizes steam exhausted from generator turbines to supplySteam Coal Paper Sugar Textiles Building Material Steel Metals Chemicals (Mtce/yr) s Investment Project Capital Construction Cogeneration Small Generator

Zhiping, L.

2010-01-01T23:59:59.000Z

82

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

i.e. , more efficient power generation and gas recovery,building materials, and power generation. ^ This sectionheat and pressure for power generation—previously considered

Zhiping, L.

2010-01-01T23:59:59.000Z

83

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

Industries Industry Bricks Cement Lime Plate Glass CeramicsIndustry furnaces for household glass, enamel, and ceramicsindustry waste heat from blast furnaces is used to dry primary ceramic and

Zhiping, L.

2010-01-01T23:59:59.000Z

84

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

Subsector The iron and steel industry accounted for roughlyn importance, as in the steel industries in other countries.furnaces China's iron and steel industry uses approximately

Zhiping, L.

2010-01-01T23:59:59.000Z

85

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

Energy Conservation Policy Documents (Central Government),Energy Conservation Policy Documents (Central Government),Energy Conservation Policy Documents (Central Government),

Zhiping, L.

2010-01-01T23:59:59.000Z

86

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

Cement Plant Renovation Fuel-Gas Recovery District.Heating Honeycomb Briquettes Coal Processing Raw Material Conservation (b) Technology Updating Waste Heat &

Zhiping, L.

2010-01-01T23:59:59.000Z

87

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

Investment And Energy Savings Data Capital Constructionand Apparent Net Energy Savings Physical Energy Intensity ofthe "Zhejiang Province Energy-Saving Regulations" from the

Zhiping, L.

2010-01-01T23:59:59.000Z

88

Industrial Sector Energy Conservation Programs in the People's Republic of China during the Seventh Five-Year Plan (1986-1990)  

E-Print Network (OSTI)

of coal powder injections for coke i n blast furnaces Theof coal powder injections for coke in ironmaking is a commonenergy use medium plants, coke & coal use medium plants,

Zhiping, L.

2010-01-01T23:59:59.000Z

89

Solar irrigation program plan. Revision  

DOE Green Energy (OSTI)

This report describes the ERDA solar irrigation program plan through fiscal year 1979. It is an update of the original program plan as outlined in Sandia Report SAND--76-0594. The updated goals of the plan are listed, the participants named, and their responsibilities outlined. ERDA has the program responsibility, ERDA field offices the contractural responsibility, and Sandia Laboratories the technical direction responsibilities. Three solar irrigation experiments planned, system analyses to be conducted, and the participants of the program are described. This document is intended to be used as a program guide for accomplishing the program goals.

Alvis, R.L.; Vandevender, S.G.

1977-06-01T23:59:59.000Z

90

Wind Program: Program Plans, Implementation, and Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind Program Wind Program HOME ABOUT RESEARCH & DEVELOPMENT DEPLOYMENT FINANCIAL OPPORTUNITIES INFORMATION RESOURCES NEWS EVENTS EERE » Wind Program » About Key Activities Plans, Implementation, & Results Budget Contacts Plans, Implementation, and Results Here you'll find an overview of the Wind Program and links to its program planning, implementation, and results documents. This list summarizes the program's wind power research, development, and demonstration activities. Read more about: Overview Learn more about this EERE Office. Plans Discover the plans, budgets, and analyses that set the direction of office priorities and activities. Implementation Find out how the office controls, implements, and adjusts its plans and manages its activities. Results Learn about the technological, commercial, and other outputs and outcomes

91

Five Year Plan September 1, 2006 August 31, 2011  

E-Print Network (OSTI)

Reservoirs 621 Petroleum Development Strategy 622 Exploration and Production Evaluation 623 Waterflooding 624

Behmer, Spencer T.

92

Page 1 of 20 A Five Year Diversity Plan Draft  

E-Print Network (OSTI)

Martin Kimi Mojica Steve Morozumi Karen Munro Erin O'Brien A.J. Peper Steve Pickett Leslie Sanchez John Laura Blake-Jones Doug Blandy Heather Bottorff Chris Browning James Chang Diane Del Guercio Kassia

Kleshchev, Alexander

93

Shock Therapy in Poland: Perspectives of Five Years  

E-Print Network (OSTI)

Shock Therapy in Poland: Perspectives of Five Years JEFFREY SACHS THE TANNER LECTURES O N HUMAN to a market economy.This strategy has subsequently won the somewhat misleading sobriquet of "shock therapy of "shock therapy," see Sachs 1994c.) With five years of experience of economic reform in Eastern Europe

94

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

COMBUSTION SYSTEMS COMBUSTION SYSTEMS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

95

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SEPTEMBER 2013 SEPTEMBER 2013 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

96

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SOLID OXIDE FUEL CELLS SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

97

Fermilab | Directorate | Program Planning Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Planning Office Program Planning Office Steve Geer, Head The Program Planning Office within the Fermilab Directorate coordinates the experimental physics program carried out at the Laboratory. The office provides a link between ongoing and planned experiments and the Directorate, by: Acting as liaison between experimenters and laboratory staff regarding beam conditions during accelerator operation. Establishing priorities between accelerator studies and experiments and among experiments, in consultation with the Director, and resolving conflicting requests from experiments. Coordinating Division and Section reviews of draft Memoranda of Understanding for approved experiments. Coordinating updates to the "Procedures for Researchers" which provides a guide for researchers using Fermilab facilities.

98

LDRD FY 2014 Program Plan  

SciTech Connect

As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

Anita Gianotto; Dena Tomchak

2013-08-01T23:59:59.000Z

99

New Production Reactors Program Plan  

SciTech Connect

Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

1990-12-01T23:59:59.000Z

100

Biofuels Program Plan, FY 1992--FY 1996. Executive summary  

DOE Green Energy (OSTI)

This five-year program plan describes the goals and philosophy of the US Department of Energy`s (DOE) Biofuels Systems Division (BSD) program and the BSD`s major research and development (R&D) activities for fiscal years (FY) 1992 through 1996. The plan represents a consensus among government and university researchers, fuel and automotive manufacturers, and current and potential users of alternative fuels and fuel additives produced from biomass. It defines the activities that are necessary to produce versatile, domestic, economical, renewable liquid fuels from biomass feedstocks. The BSD program focuses on the production of alternative liquid fuels for transportation-fuels such as ethanol, methanol, biodiesel, and fuel additives for reformulated gasoline. These fuels can be produced from many plant materials and from a significant portion of the wastes generated by municipalities and industry. Together these raw materials and wastes, or feedstocks, are called biomass.

Not Available

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Fiscal year 1987 program plan  

SciTech Connect

The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

1986-12-01T23:59:59.000Z

102

Civilian radioactive waste management program plan. Revision 2  

SciTech Connect

This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

1998-07-01T23:59:59.000Z

103

RCS program evaluation plan options  

Science Conference Proceedings (OSTI)

The Residential Conservation Service (RCS) Program evaluation plan is designed to provide an ongoing evaluation during the RCS Program's active period as well as a measurement of the RCS Program's cumulative effect after the program's termination. The study options described include utility case studies, random survey sampling, directed survey sampling, and remote data collection. Survey techniques are described and appropriate questions are suggested. Several sample selection criteria are included as background for a DOE policy decision on this issue. Present and anticipated data sources are listed and discussed. Statistical data analysis plans include a preliminary determination of required sample sizes.

Stovall, T.K.; Bayne, C.K.

1980-10-01T23:59:59.000Z

104

Equipment qualification research program: program plan  

Science Conference Proceedings (OSTI)

The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump.

Dong, R.G.; Smith, P.D.

1982-06-08T23:59:59.000Z

105

Strategic Plan for Minority Education Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY 2009 Strategic Plan for FY 2009 Strategic Plan for Minority Education Programs Minority Education Programs The Office of Minority Economic Impact (OMEI) is committed to serving...

106

Site Support Program Plan Infrastructure Program  

SciTech Connect

The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

NONE

1995-09-26T23:59:59.000Z

107

U.S. Department of Energy Chemical and Biological National Security Program Strategic Plan [FY00 - FY04  

SciTech Connect

This five-year strategic plan supports the mission of the DOE Chemical and Biological National Security Program to develop, demonstrate and deliver technologies and systems that will lead to major improvements in the U.S capability to prepare for and respond to chemical or biological attacks.

2000-04-01T23:59:59.000Z

108

Solid Waste Management Program Plan  

SciTech Connect

The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

Duncan, D.R.

1990-08-01T23:59:59.000Z

109

Geothermal induced seismicity program plan  

DOE Green Energy (OSTI)

A plan for a National Geothermal Induced Seismicity Program has been prepared in consultation with a panel of experts from industry, academia, and government. The program calls for baseline seismic monitoring in regions of known future geothermal development, continued seismic monitoring and characterization of earthquakes in zones of geothermal fluid production and injection, modeling of the earthquake-inducing mechanism, and in situ measurement of stresses in the geothermal development. The Geothermal Induced Seismicity Program (GISP) will have as its objectives the evaluation of the seismic hazard, if any, associated with geothermal resource exploitation and the devising of a technology which, when properly utilized, will control or mitigate such hazards.

Not Available

1981-03-01T23:59:59.000Z

110

Building Technologies Program Planning Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building Technologies Program Planning Summary Building Technologies Program Planning Summary Introduction The U.S. Department of Energy's (DOE) Building Technologies Program (BTP) works in partnership with industry, state, municipal, and other federal organizations to achieve the goals of marketable net-zero energy buildings. Such buildings are extremely energy efficient, ideally producing as much energy as they use over the course of a year. BTP also works with stakeholders and federal partners to meet any remaining energy needs for their buildings through on-site renewable energy systems. Drivers Population growth and economic expansion, along with an accompanying increase in energy demand, are expected to drive energy consumption in buildings to more than 50 quadrillion Btu (quads)

111

Documents: Program Planning and Decision Making  

NLE Websites -- All DOE Office Websites (Extended Search)

documents Program Planning and Decision Making PDF Icon Final Plan for the Conversion of Depleted Uranium Hexafluoride 345 KB details PDF Icon Depleted Uranium Hexafluoride...

112

Federal Energy Management Program: Plans, Implementation, and...  

NLE Websites -- All DOE Office Websites (Extended Search)

Plans, Implementation, and Results to someone by E-mail Share Federal Energy Management Program: Plans, Implementation, and Results on Facebook Tweet about Federal Energy...

113

Idaho Supplementation Studies : Five Year Report : 1992-1996.  

SciTech Connect

In 1991, the Idaho Supplementation Studies (ISS) project was implemented to address critical uncertainties associated with hatchery supplementation of chinook salmon Oncorhynchus tshawytscha populations in Idaho. The project was designed to address questions identified in the Supplementation Technical Work Group (STWG) Five-Year-Workplan (STWG 1988). Two goals of the project were identified: (1) assess the use of hatchery chinook salmon to increase natural populations in the Salmon and Clearwater river drainages, and (2) evaluate the genetic and ecological impacts of hatchery chinook salmon on naturally reproducing chinook salmon populations. Four objectives to achieve these goals were developed: (1) monitor and evaluate the effects of supplementation on presmolt and smolt numbers and spawning escapements of naturally produced fish; (2) monitor and evaluate changes in natural productivity and genetic composition of target and adjacent populations following supplementation; (3) determine which supplementation strategies (broodstock and release stage) provide the quickest and highest response in natural production without adverse effects on productivity; and (4) develop supplementation recommendations. This document reports on the first five years of the long-term portion of the ISS project. Small-scale studies addressing specific hypotheses of the mechanisms of supplementation effects (e.g., competition, dispersal, and behavior) have been completed. Baseline genetic data have also been collected. Because supplementation broodstock development was to occur during the first five years, little evaluation of supplementation is currently possible. Most supplementation adults did not start to return to study streams until 1997. The objectives of this report are to: (1) present baseline data on production and productivity indicators such as adult escapement, redd counts, parr densities, juvenile emigrant estimates, and juvenile survival to Lower Granite Dam (lower Snake River); (2) recommend changes in methodologies and tasks to improve data collection efficiency and utility.

Walters, Jody P.

1999-08-01T23:59:59.000Z

114

Water Power Program: Program Plans, Implementation, and Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Water Power Program Water Power Program HOME ABOUT RESEARCH & DEVELOPMENT FINANCIAL OPPORTUNITIES INFORMATION RESOURCES NEWS EVENTS EERE » Water Power Program » About Key Activities Plans, Implementation, & Results Budget Peer Review 2011 Contacts Plans, Implementation, and Results Here you'll find an overview of the Water Power Program and links to its program planning, implementation, and results documents. This list summarizes the program's water power research, development, and demonstration activities. Read more about: Overview Learn more about this EERE Office. Plans Discover the plans, budgets, and analyses that set the direction of office priorities and activities. Implementation Find out how the office controls, implements, and adjusts its plans and manages its activities.

115

Water Power Program: Program Plans, Implementation, and Results  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Power Program Water Power Program HOME ABOUT RESEARCH & DEVELOPMENT FINANCIAL OPPORTUNITIES INFORMATION RESOURCES NEWS EVENTS EERE » Water Power Program » About Key Activities Plans, Implementation, & Results Budget Peer Review 2011 Contacts Plans, Implementation, and Results Here you'll find an overview of the Water Power Program and links to its program planning, implementation, and results documents. This list summarizes the program's water power research, development, and demonstration activities. Read more about: Overview Learn more about this EERE Office. Plans Discover the plans, budgets, and analyses that set the direction of office priorities and activities. Implementation Find out how the office controls, implements, and adjusts its plans and manages its activities.

116

Long range plan - Plowshare excavation program (Book 1 - 1966/1967 excavation program binder)  

SciTech Connect

The purpose of this report is to present a proposed five-year program for the Plowshare Excavation Program. In preparing this study we proceed as follows: (a) Review the significant advances (since 1963) in nuclear excavation technology, and (b) identify the key uncertainties in that technology. After completing these two steps, we then proceed to identify key experiments and any new measurements that may be required to increase our predictive capability and/or to resolve the major uncertainties. It is probably clear that if one proceeds in this fashion one may not necessarily arrive at the existing long range excavation program (e.g., the definitions of experiments beyond Cabriolet and Buggy). In fact, one might expect to derive a significantly different long range plan.

Knox, J. B.

1967-09-07T23:59:59.000Z

117

Environmental Restoration Information Resource Management Program Plan  

SciTech Connect

The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

Not Available

1994-09-01T23:59:59.000Z

118

Multiyear Program Plan Template - Phase II Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Multiyear Program Plan Template Multiyear Program Plan Template Phase II Guidance June 30, 2006 Foreword: The Purpose and Value of a Multiyear Program Plan Multiyear Program Plans (MYPPs) are intended primarily to serve as operational guides for programs to manage their activities and as a source of information to help EERE management identify clear linkages between key program activities and progress toward goals. It is understood, however, that they are also read by a broad group of program stakeholders and may serve other purposes as well. Strategic planning in government is closely integrated with budgeting. In effective organizations, planning and strategy guide budget requests, not the other way around. Strategic planning enables programs to create logical budgets and manage their activities toward programmatic and

119

Headquarters Facilities Work Planning and Control Program | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program...

120

Pollution prevention program plan 1996  

SciTech Connect

This plan serves as the principal crosscutting guidance to Department of Energy (DOE) Headquarters, Operations Office, laboratory, and contractor management to fully implement pollution prevention programs within the DOE complex between now and 2000. To firmly demonstrate DOE`s commitment to pollution prevention, the Secretary of Energy has established goals, to be achieved by December 31, 1999, that will aggressively reduce DOE`s routine generation of radioactive, mixed, and hazardous wastes, and total releases and offsite transfers of toxic chemicals. The Secretary also has established sanitary waste reduction, recycling, and affirmative procurement goals. Site progress in meeting these goals will be reported annually to the Secretary in the Annual Report on Waste Generation and Waste Minimization Progress, using 1993 as the baseline year. Implementation of this plan will represent a major step toward reducing the environmental risks and costs associated with DOE operations.

NONE

1996-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Environmental Restoration Quality Program Plan  

Science Conference Proceedings (OSTI)

The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

Colley, J.S.

1992-08-01T23:59:59.000Z

122

Environmental Restoration Program Management Control Plan  

SciTech Connect

This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives.

1991-09-01T23:59:59.000Z

123

Early Site Permit Model Program Plan  

Science Conference Proceedings (OSTI)

"The Early Site Permit (ESP) Model Program Plan (MPP)" provides step-by-step guidelines on preparing an ESP application. The Plan identifies work tasks necessary to prepare the application and guides applicants on effectively planning and managing the ESP program, including identifying and managing subcontracted resources. A model program plan details how to prepare applications. The MPP also describes interfaces among tasks and provides a generic schedule for executing the steps in preparing an ESP appl...

2002-06-12T23:59:59.000Z

124

Pilot chargeback system program plan  

SciTech Connect

This planning document outlines the steps necessary to develop, test, evaluate, and potentially implement a pilot chargeback system at the Idaho National Engineering and Environmental Laboratory for the treatment, storage, and disposal of current waste. This pilot program will demonstrate one system that can be used to charge onsite generators for the treatment and disposal of low-level radioactive waste. In FY 1997, mock billings will begin by July 15, 1997. Assuming approvals are received to do so, FY 1998 activities will include modifying the associated automated systems, testing and evaluating system performance, and estimating the amount generators will spend for waste storage, treatment, and disposal in FY 1999. If the program is fully implemented in FY 1999, generators will pay actual, automated bills for waste management services from funds transferred to their budgets from Environmental Management.

Smith, P.

1997-03-01T23:59:59.000Z

125

Environmental Restoration Program Records Management Plan  

SciTech Connect

This document describes the plans, organization, and control systems to be used for management of the Hanford Site Environmental Restoration (ER) Program. The Field Office Management Plan (FOMP), in conjunction with the Environmental Restoration Program Quality Assurance System Requireme ts for the Hanford Site (QASR [DOE-RL 1992a]), provides requirements governing ER Program work activities on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (WHC) ER Program Office has developed this ER Program Records Management Plan to fulfill the requirements of the FOMP (DOE-RL 1989). This records management plan will enable the ER Program Office and other ER Program participants to identify, control, and maintain the records generated and used in support of the ER Program.

Montgomery, L.M.

1992-12-01T23:59:59.000Z

126

Environmental Monitoring Program Quality Assurance Project Plan  

SciTech Connect

The Quality Assurance Project Plan (QAPP) is intended to document the quality assurance of the Environmental Monitoring Program. The Quality Assurance Project Plan has two parts and is written to become a chapter in the Environmental Monitoring Plan. Part A describes the management responsibilities and activities performed to assure the quality of the Environmental Monitoring Program. Part B covers the documentation requirements for changes in the Monitoring Program, and provides details on control of the design and implementation of quality assurance activities.

Holland, R.C.

1993-06-01T23:59:59.000Z

127

Portsmouth Site Plant Surpasses Five Years Without Lost-Time Accident |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plant Surpasses Five Years Without Lost-Time Plant Surpasses Five Years Without Lost-Time Accident Portsmouth Site Plant Surpasses Five Years Without Lost-Time Accident November 26, 2013 - 12:00pm Addthis BWCS employees from all departments of the DUF6 project at the Portsmouth site come together to mark five years without a lost-time accident. BWCS employees from all departments of the DUF6 project at the Portsmouth site come together to mark five years without a lost-time accident. Russ Hall, environment, safety and health supervisor, changes the DUF6 project sign to mark five years without a lost-time accident. Russ Hall, environment, safety and health supervisor, changes the DUF6 project sign to mark five years without a lost-time accident. BWCS employees from all departments of the DUF6 project at the Portsmouth site come together to mark five years without a lost-time accident.

128

2013 Annual Planning Summary for the Loan Program Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Program Office 2013 Annual Planning Summary for the Loan Program Office 2013 Annual Planning Summary for the Loan Program Office The ongoing and projected Environmental...

129

Combined Operating License Model Program Plan  

Science Conference Proceedings (OSTI)

The Model Program Plan (MPP) provides functional guidance on how to prepare a Combined Operating License (COL) application for a new nuclear power facility when incorporating previous findings from both design certification (DC) and an early site permit (ESP) proceedings. The plan identifies the activities necessary to prepare an application and provides guidance on planning and managing a COL program, including working with DC and ESP holders and using subcontracted resources to develop necessary new in...

2003-11-17T23:59:59.000Z

130

SMUD's HVAC Programs Ravi Patel-Program Planning  

E-Print Network (OSTI)

1 SMUD's HVAC Programs 5-7-13 Ravi Patel- Program Planning Bruce Baccei- R&D #12;SMUD's Residential contractors trained and BPI certified ­ Majority were pushing only HVAC; now driving the HPP · Program encourages more HVAC replacements to occur through HPP ­ Move away from stand alone programs ­ Start

California at Davis, University of

131

Quality Assurance Program Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quality Assurance Program Plan Quality Assurance Program Plan Quality Assurance Program Plan The achievement of quality in LM activities and products requires implementation of a formal Quality Assurance (QA) Program. This program establishes principles, requirements, practices, and methods for integrating quality into the daily operations of our programs and projects. The QA Program functions as a management tool to ensure that quality objectives are achieved throughout LM's technical, administrative, and operational functions. Achieving quality is the responsibility of managers as well as those who perform the work. Each employee is expected to do the job in accordance with procedures and other requirements. The name LM must represent quality to us, our customers, our service providers, and our

132

24 Command Fire Improvement Action Program Plan  

SciTech Connect

Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements.

GRIFFIN, G.B.

2000-12-01T23:59:59.000Z

133

International Photovoltaic Program Plan. Volume II. Appendices  

SciTech Connect

This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.

Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

1979-12-01T23:59:59.000Z

134

Natural Gas Multi-Year Program Plan  

SciTech Connect

This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

1997-12-01T23:59:59.000Z

135

Low Dose Radiation Research Program: Original Research Program Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Original Research Program Plan Original Research Program Plan Biological Effects of Low Dose and Dose Rate Radiation Prepared for the Office of Biological and Environmental Research by The Low Dose Radiation Research Program Plan Subcommittee of the Biological and Environmental Research Advisory Committee. II. Table of Contents Face Page Table of Contents Executive Summary Introduction Program Outline Low Dose Radiation vs. Endogenous Oxidative Damage - The Same or Different? Key Question Description Decision Making Value Recommendations and Costs Understanding Biological Responses to Radiation And Endogenous Damage Key Question Description Decision Making Value Recommendations and Costs Thresholds for Low Dose Radiation - Fact or Fiction? Key Question Description Decision Making Value Recommendations and Costs

136

Ground water protection management program plan  

SciTech Connect

U.S. Department of Energy (DOE) Order 5400.1 requires the establishment of a ground water protection management program to ensure compliance with DOE requirements and applicable federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office was prepared this Ground Water Protection Management Program Plan (ground water protection plan) whose scope and detail reflect the program`s significance and address the seven activities required in DOE Order 5400.1, Chapter III, for special program planning. This ground water protection plan highlights the methods designed to preserve, protect, and monitor ground water resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies technical guidance documents and site-specific documents for the UMTRA Project ground water protection management program. In addition, the plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA Project sites.

Not Available

1994-02-01T23:59:59.000Z

137

Baldrige Program Business Plan Summary  

Science Conference Proceedings (OSTI)

... This summary describes the Baldrige Performance Excellence Program's transition from funding via federal appropriations to a self-sustaining ...

2013-02-14T23:59:59.000Z

138

Light Water Reactor Sustainability Program - Integrated Program Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Light Water Reactor Sustainability Program - Integrated Program Light Water Reactor Sustainability Program - Integrated Program Plan Light Water Reactor Sustainability Program - Integrated Program Plan The Light Water Reactor Sustainability (LWRS) Program is a research and development (R&D) program sponsored by the U. S. Department of Energy (DOE), performed in close collaboration and cooperation with related industry R&D programs. The LWRS Program provides technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants, utilizing the unique capabilities of the national laboratory system. Sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer than-initially-licensed lifetime. It has two facets

139

Planning, Programming, and Budgeting | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning, Programming, and Budgeting Planning, Programming, and Budgeting Planning, Programming, and Budgeting October 16, 2013 - 5:13pm Addthis Planning, Programming & Budgeting Building Design Project Construction During the initial phases of Federal new construction and major renovation projects, agencies inevitably ask the same question: When in the process should I start considering renewable energy? The short answer is that it is never too early. Early decisions on goals, siting, budgets, and the members of the project team can greatly affect the agency's ability to effectively integrate energy efficiency and renewable energy into the project. It is important to note that incorporating renewable energy technology is just one of many goals that a successful project must meet, and that compromises may be required to satisfy

140

Tank waste remediation system environmental program plan  

SciTech Connect

This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

Borneman, L.E.

1998-01-09T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Protection Programming Defensive Planning for Fixed Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NOT MEASUREMENT NOT MEASUREMENT SENSITIVE DOE STD-1207-2012 December 2012 DOE STANDARD Protection Program Defensive Planning For Fixed Facilities U.S. Department of Energy AREA SANS Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE STD-1207-2012 This Page Intentionally Left Blank ii DOE STD-1207-2012 TABLE OF CONTENTS FOREWORD..................................................................................................................................v PROTECTION PROGRAM DEFENSIVE PLANNING ..........................................................1 1. SCOPE............................................................................................................................ 1 2. PURPOSE. ..................................................................................................................... 1

142

Completion of the Five-Year Reviews for the Monticello, Utah...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completion of the Five-Year Reviews for the Monticello, Utah, Radioactively Contaminated Properties Site (Monticello Vicinity Properties) and the Monticello Mill Tailings Site...

143

Study and program plan for improved heavy duty gas turbine engine ceramic component development  

DOE Green Energy (OSTI)

A five-year program plan was generated from the study activities with the objectives of demonstrating a fuel economy of 213 mg/W . h (0.35 lb/hp-hr) brake specific fuel consumption by 1981 through use of ceramic materials, with conformance to current and projected Federal noise and emission standards, and to demonstrate a commercially viable engine. Study results show that increased turbine inlet and regenerator inlet temperatures, through the use of ceramic materials, contribute the greatest amount to achieving fuel economy goals. Further, improved component efficiencies (for the compressor, gasifier turbine, power turbine, and regenerator disks show significant additional gains in fuel economy. Fuel saved in a 500,000-mile engine life, risk levels involved in development, and engine-related life cycle costs for fleets (100 units) of trucks and buses were used as criteria to select work goals for the planned program.

Helms, H.E.

1977-05-01T23:59:59.000Z

144

Science Plan for the Atmospheric Radiation Measurement Program (ARM)  

SciTech Connect

The purpose of this Atmospheric Radiation Measurement (ARM) Science Plan is to articulate the scientific issues driving the ARM Program, and to relate them to DOE`s programmatic objectives for ARM, based on the experience and scientific progress gained over the past five years. ARM programmatic objectives are to: (1) Relate observed radiative fluxes and radiances in the atmosphere, spectrally resolved and as a function of position and time, to the temperature and composition of the atmosphere, specifically including water vapor and clouds, and to surface properties, and sample sufficient variety of situations so as to span a wide range of climatologically relevant possibilities; (2) develop and test parameterizations that can be used to accurately predict the radiative properties and to model the radiative interactions involving water vapor and clouds within the atmosphere, with the objective of incorporating these parameterizations into general circulation models. The primary observational methods remote sending and other observations at the surface, particularly remote sensing of clouds, water vapor and aerosols.

NONE

1996-02-01T23:59:59.000Z

145

Strategic Plan for Minority Education Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 Strategic Plan for FY 2009 Strategic Plan for 09 Strategic Plan for FY 2009 Strategic Plan for Minority Education Programs Minority Education Programs The Office of Minority Economic Impact (OMEI) is committed to serving as the primary advocate for minority education institutions and shepherding the Department's support of these institutions by implementing programs to enhance economic and community development capacities among under- represented populations. Prepared by: THE OFFICE OF ECONOMIC IMPACT & DIVERSITY Office of Minority Economic Impact Overview: Mission, Core Values and Vision Mission The mission of the Department's Office of Minority Economic Impact is to build effective partnerships between the Department and minority institutions, increase the capabilities of such institutions to compete effectively for grants and contracts, and to

146

Advanced Engineering Preliminary Program Planning, Rough Draft  

SciTech Connect

The purpose of this document is to assembly certain job elements which may become part of the Advanced Engineerng Subsection programs, so that those individuals who may be requested to participate in such programs may be aware of the nature and form of Advanced Engineering planning.

Towle, H.C.

1961-04-20T23:59:59.000Z

147

Building Technologies Office: Program Plans, Implementation, and Results  

NLE Websites -- All DOE Office Websites (Extended Search)

About About Printable Version Share this resource Send a link to Building Technologies Office: Program Plans, Implementation, and Results to someone by E-mail Share Building Technologies Office: Program Plans, Implementation, and Results on Facebook Tweet about Building Technologies Office: Program Plans, Implementation, and Results on Twitter Bookmark Building Technologies Office: Program Plans, Implementation, and Results on Google Bookmark Building Technologies Office: Program Plans, Implementation, and Results on Delicious Rank Building Technologies Office: Program Plans, Implementation, and Results on Digg Find More places to share Building Technologies Office: Program Plans, Implementation, and Results on AddThis.com... Key Activities Plans, Implementation, & Results

148

Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program Plan  

Energy.gov (U.S. Department of Energy (DOE))

The NEAMS program plan includes information on the program vision, objective, scope, schedule and cost, management, development team and collaborations.

149

River Protection Project (RPP) Environmental Program Plan  

SciTech Connect

This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

POWELL, P.A.

2000-03-29T23:59:59.000Z

150

Natural gas strategic plan and program crosscut plans  

SciTech Connect

The natural gas strategic plan recognizes the challenges and opportunities facing increased U.S. natural gas use. Focus areas of research include natural gas supply, delivery, and storage, power generation, industrial, residential and commercial, natural gas vehicles, and the environment. Historical aspects, mission, situation analysis, technology trends, strategic issues, performance indicators, technology program overviews, and forecasting in the above areas are described.

1995-06-01T23:59:59.000Z

151

Assessment of Building Energy-Saving Policies and Programs in...  

NLE Websites -- All DOE Office Websites (Extended Search)

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan Title Assessment of Building Energy-Saving Policies and Programs in China During...

152

Assessment of Building Energy-Saving Policies and Programs in...  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan Title Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five...

153

TROPOSPHERIC AEROSOL PROGRAM, PROGRAM PLAN, MARCH 2001  

Science Conference Proceedings (OSTI)

The goal of Tropospheric Aerosol Program (TAP) will be to develop the fundamental scientific understanding required to construct tools for simulating the life cycle of tropospheric aerosols--the processes controlling their mass loading, composition, and microphysical properties, all as a function of time, location, and altitude. The TAP approach to achieving this goal will be by conducting closely linked field, modeling, laboratory, and theoretical studies focused on the processes controlling formation, growth, transport, and deposition of tropospheric aerosols. This understanding will be represented in models suitable for describing these processes on a variety of geographical scales; evaluation of these models will be a key component of TAP field activities. In carrying out these tasks TAP will work closely with other programs in DOE and in other Federal and state agencies, and with the private sector. A forum to directly work with our counterparts in industry to ensure that the results of this research are translated into products that are useful to that community will be provided by NARSTO (formerly the North American Research Strategy on Tropospheric Ozone), a public/private partnership, whose membership spans government, the utilities, industry, and university researchers in Mexico, the US, and Canada.

SCHWARTZ,S.E.; LUNN,P.

2001-03-01T23:59:59.000Z

154

Program Plans, Implementation, and Results | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

About » Program Plans, Implementation, and Results About » Program Plans, Implementation, and Results Program Plans, Implementation, and Results The Building Technologies Office (BTO) carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that guide, support, and document the program management process and associated results and public benefits. Program Overview Program Plans Program Implementation Program Results Relevant Laws Program Overview Documents Better Buildings, Brighter Future: an overview of BTO activities. Program Presentation: outlines the program's priorities and goals for improving the energy efficiency of buildings. Building Energy Codes Overview Energy Efficiency Trends in Residential and Commercial Buildings

155

Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online February 3, 2011 - 12:00pm Addthis Media Contact Danielle Miller (DOE-ID) 208-526-5709 An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy's (DOE) Idaho site. "This report verifies that the performance of cleanup actions at the Idaho Site continues to be protective of human health and the environment," said Nicole Hernandez, DOE's project manager for the five-year review. "The findings in the report demonstrate a strong collaborative effort by CH2M-WG Idaho (CWI), DOE, the Environmental

156

Geothermal subsidence research program plan  

DOE Green Energy (OSTI)

A comprehensive research program to investigate subsidence from geothermal energy production was developed from the point of view of a developer of an energy facility and the policy maker who regulates such facilities. The organizational structure, objectives, and time schedule are outlined. Each of the research categories is discussed separately. (MHR)

Not Available

1977-04-01T23:59:59.000Z

157

Ocean Thermal Energy Conversion Program Management Plan  

DOE Green Energy (OSTI)

The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

Combs, R E

1980-01-01T23:59:59.000Z

158

FY 1974 program plan for geothermal project  

SciTech Connect

The Program Plan specifies the basic plan for the utilization of FY-74 funds allocated by the AEC Division of Applied Technology and contributions from other participants for the development of geothermal energy in southern Idaho. Funding priorities are dictated by the Construction Data Package submission deadline and the October 1, 1974, site selection. Tasks not funded during FY-74 will be pursued during FY-75. (auth)

1974-02-05T23:59:59.000Z

159

Geothermal exploration and assessment technology program plan. Final report  

DOE Green Energy (OSTI)

The following program plan elements are described: barriers to commercialization, cost/benefit analysis for exploration assessment technology (hydrothermal systems), goals, objectives, technical plan, management plan, budget, and procurement plan. (MHR)

Not Available

1978-10-30T23:59:59.000Z

160

Light Water Reactor Sustainability Program: Integrated Program Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrated Program Plan Integrated Program Plan Light Water Reactor Sustainability Program: Integrated Program Plan Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas- emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by more than 30% from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Integrated test vehicle program plan: revision C  

DOE Green Energy (OSTI)

This edition dated August 26, 1977, is Revision C of the Integrated Test Vehicle, Program Plan, Phase II - Deliverable Item 2-7-1. The original edition was issued on May 27, 1977. Corrections were made and issued as Proposed Modifications for Integrated Test Vehicle, Program Plan, dated July 8, 1977. For the purpose of documenting changes, the July 8, 1977, version is caled Revision A. The edition dated August 5, 1977, is called Revision B. Each paragraph in this edition is marked to indicate technical changes from previous editions.

Not Available

1977-08-26T23:59:59.000Z

162

Atmospheric Radiation Measurement Program Science Plan  

SciTech Connect

The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative transfer, aerosol science, determination of cloud properties, cloud modeling, and cloud parameterization testing and development. The focus of ARM science has naturally shifted during the last few years to an increasing emphasis on modeling and parameterization studies to take advantage of the long time series of data now available. During the next 5 years, the principal focus of the ARM science program will be to: Maintain the data record at the fixed ARM sites for at least the next five years. Improve significantly our understanding of and ability to parameterize the 3-D cloud-radiation problem at scales from the local atmospheric column to the global climate model (GCM) grid square. Continue developing techniques to retrieve the properties of all clouds, with a special focus on ice clouds and mixed-phase clouds. Develop a focused research effort on the indirect aerosol problem that spans observations, physical models, and climate model parameterizations. Implement and evaluate an operational methodology to calculate broad-band heating rates in the atmospheric columns at the ARM sites. Develop and implement methodologies to use ARM data more effectively to test atmospheric models, both at the cloud-resolving model scale and the GCM scale. Use these methodologies to diagnose cloud parameterization performance and then refine these parameterizations to improve the accuracy of climate model simulations. In addition, the ARM Program is actively developing a new ARM Mobile Facility (AMF) that will be available for short deployments (several months to a year or more) in climatically important regions. The AMF will have much of the same instrumentation as the remote facilities at ARM's Tropical Western Pacific and the North Slope of Alaska sites. Over time, this new facility will extend ARM science to a much broader range of conditions for model testing.

Ackerman, T

2004-10-31T23:59:59.000Z

163

Vehicle Technologies Office: Program Plans, Implementation, and Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Plans, Implementation, and Results Program Plans, Implementation, and Results The U.S. Department of Energy's (DOE) Vehicle Technologies Program (VTP) accelerates the deployment of advanced vehicle technologies and renewable fuels to strengthen the U.S. economy by creating jobs, while reducing petroleum consumption, air pollution, and greenhouse gas emissions. To accomplish these goals, VTP works with industry leaders, national laboratories, universities, and state and local governments in five strategic program areas. Program Overview Program Plans Program Implementation Program Results Program Overview Summary Vehicle Technologies Program: Goals, Strategies, and Top Accomplishments, Dec. 2010 Key Program Overview Documents Program Fact Sheet Program Deep Dive Briefing Program Overview Legislative and Executive Guidance

164

Federal Energy Management Program: Renewable Energy Project Planning and  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewable Energy Renewable Energy Project Planning and Implementation to someone by E-mail Share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Facebook Tweet about Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Twitter Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Google Bookmark Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Delicious Rank Federal Energy Management Program: Renewable Energy Project Planning and Implementation on Digg Find More places to share Federal Energy Management Program: Renewable Energy Project Planning and Implementation on AddThis.com... Energy-Efficient Products

165

Lightweight materials for transportation: Program plan  

DOE Green Energy (OSTI)

This Program Plan has been prepared by the Office of Transportation Materials in response to a request by the House Committee on Appropriations. It recognizes that a significant commitment to long-term, stable materials research and development (R&D) is required to realize the benefits of lighter weight vehicles, including economic, environmental and energy related benefits. Extensive input was obtained from the major US automakers and from representative materials and component suppliers. Considerable interaction with the key members of the US Automotive Materials Partnership (USAMP) has ensured consistency of technical direction. The program will support R&D activity at industrial sites through competitively bid subcontracts with cost sharing anticipated at 30--50%, with the higher amounts in process scale-up and manufacturing technology development. The recommended LWM Program will enable industry to develop pecessary technology by utilizing their capabilities as well as accessing supporting technology at national laboratories, universities, ongoing program activity at NASA, DoD, DOT, NIST, etc., and thereby leverage industry resources through integrated team approaches. Many individual program efforts are currently in place that address small portions of the overall needs of the LWM Program, both within DOE and in other agencies. Cognizance of these and overall integration of research activities are planned as significant program management tasks. Because of the international nature of the automobile business, benchmarking of foreign technology and tracking of worldwide developments are also key program elements.

Not Available

1993-07-01T23:59:59.000Z

166

Heat pipe testing program test plan  

SciTech Connect

A test plan is given which describes the tests to be conducted on several typical solar receiver heat pipes. The hardware to be used, test fixtures and rationale of the test program are discussed. The program objective is to perform life testing under simulated receiver conditions, and to conduct performance tests with selected heat pipes to further map their performance, particularly with regard to their transient behavior. Performance requirements are defined. Test fixtures designed for the program are described in detail, and their capabilities for simulating the receiver conditions and their limitations are discussed. The heat pipe design is given. (LEW)

Bienert, W.B.

1980-03-14T23:59:59.000Z

167

Energy Department Announces Five-Year Renewal of Funding for Bioenergy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Department Announces Five-Year Renewal of Funding for Energy Department Announces Five-Year Renewal of Funding for Bioenergy Research Centers Energy Department Announces Five-Year Renewal of Funding for Bioenergy Research Centers April 4, 2013 - 1:48pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - The U.S. Department of Energy today announced it would fund its three Bioenergy Research Centers for an additional five-year period, subject to continued congressional appropriations. The three Centers -including the BioEnergy Research Center (BESC) led by Oak Ridge National Laboratory, the Great Lakes Bioenergy Research Center (GLBRC) led by the University of Wisconsin-Madison in partnership with Michigan State University, and the Joint BioEnergy Institute (JBEI) led by Lawrence Berkeley National Laboratory-were established by the Department's

168

Energy Department Announces Five-Year Renewal of Funding for Bioenergy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five-Year Renewal of Funding for Five-Year Renewal of Funding for Bioenergy Research Centers Energy Department Announces Five-Year Renewal of Funding for Bioenergy Research Centers April 4, 2013 - 1:48pm Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - The U.S. Department of Energy today announced it would fund its three Bioenergy Research Centers for an additional five-year period, subject to continued congressional appropriations. The three Centers -including the BioEnergy Research Center (BESC) led by Oak Ridge National Laboratory, the Great Lakes Bioenergy Research Center (GLBRC) led by the University of Wisconsin-Madison in partnership with Michigan State University, and the Joint BioEnergy Institute (JBEI) led by Lawrence Berkeley National Laboratory-were established by the Department's

169

FIVE YEAR REVIEW - MONTICELLO RADIOACTIVELY CONTAMINATED PROPERTIES - 06/11/2007  

Office of Legacy Management (LM)

Third Five-Year Review Report Third Five-Year Review Report for Monticello Radioactively Contaminated Properties Monticello, Utah San Juan County, Utah June 2007 Office of Legacy Management DOE M/1473 2007 - -L Work Performed Under DOE Contract No. for the U.S. Department of Energy Office of Legacy Management. DE-AC01-02GJ79491 Approved for public release; distribution is unlimited. Office of Legacy Management Office of Legacy Management Office of Legacy Management U.S. Department of Energy DOE-LM/1473-2007 Five-Year Review Report Third Five-Year Review Report For Monticello Radioactively Contaminated Properties Monticello, Utah San Juan County, Utah June 2007 Prepared by U.S. Department of Energy Office of Legacy Management Grand Junction, Colorado Approved by: Raymond M:'P' ness Deputy Director U.S. Department of Energy, Office of Legacy Management Brent H. Everett

170

Photovoltaics program plan, FY 1991--FY 1995  

SciTech Connect

This program plan describes the goals and philosophy of DOE National Photovoltaics Program and its major research and development activities for fiscal years (FY) 1991 through 1995. The plan represents a consensus among researchers and manufacturers, as well as current and potential users of photovoltaics (PV). It defines the activites that we believe are necessary to continue the rapid progress toward acceptance of photovoltaics as a serious candidate for cost-competitive electric power generation by the utility, transportation, buildings, and industrial sectors. A succesful National Photovoltaics Program will help achieve many of our national priorities. The mission of the National Photovoltaics Program is to help US industry to develop photovoltaic technology for large-scale generation of economically competitive electric power in the United States, making PV a significant part of our national energy mix. To fully achieve this, we must continue to work toward the long-term goals established in our previous program plan: reducing the price of delivered electricity to 5 to 6 cents per kilowatt-hour (kWh), increasing lifetimes to 30 years, and increasing module efficiencies to 15% for flat-plate and 25% for concentrator technologies. If progress continues at its current pace, we expect that the PV industry will have installed at least 1000 megawatts (MW) of capacity in the United States and 500 MW internationally by the year 2000.

1991-10-01T23:59:59.000Z

171

LFRG Program Management Plan (LFRG PMP)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LOW-LEVEL WASTE DISPOSAL FACILITY LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN SEPTEMBER 18, 2000 LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN Jay Rhoderick, Co-Chair William E. Murphie, Co-Chair LFRG Members Joel Case, Idaho Operations Office Frank DiSanza, Nevada Operations Office Doug Hildebrand, Richland Operations Office Randy Janke, Ohio Field Office Bill McMillan, Oak Ridge Operations Office Virgil Sauls, Savannah River Operations Office Jim Orban, Albuquerque Operations Office Andy Wallo, Office of Environment, Safety and Health DOE Headquarters Distribution: David M. Michaels, Assistant Secretary for Environment, Safety and Health, EH-1 Madelyn Creedon, Deputy Administrator for Defense Programs, DP-1 Rose E. Gottemoeller, Deputy Administrator for Defense Nuclear Nonproliferation, NN-1

172

Natural and accelerated bioremediation research program plan  

SciTech Connect

This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of the solution to DOE`s environmental problems.

NONE

1995-09-01T23:59:59.000Z

173

Environmental Restoration Quality Program Implementation Plan  

SciTech Connect

The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

1992-08-01T23:59:59.000Z

174

Federal Energy Management Program: Advanced Technology Planning for Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Advanced Technology Planning for Energy Savings Performance Contracts to someone by E-mail Share Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Facebook Tweet about Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Twitter Bookmark Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Google Bookmark Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Delicious Rank Federal Energy Management Program: Advanced Technology Planning for Energy Savings Performance Contracts on Digg Find More places to share Federal Energy Management Program:

175

Surplus Highly Enriched Uranium Disposition Program plan  

SciTech Connect

The purpose of this document is to provide upper level guidance for the program that will downblend surplus highly enriched uranium for use as commercial nuclear reactor fuel or low-level radioactive waste. The intent of this document is to outline the overall mission and program objectives. The document is also intended to provide a general basis for integration of disposition efforts among all applicable sites. This plan provides background information, establishes the scope of disposition activities, provides an approach to the mission and objectives, identifies programmatic assumptions, defines major roles, provides summary level schedules and milestones, and addresses budget requirements.

1996-10-01T23:59:59.000Z

176

Geothermal Logging Instrumentation Development Program Plan (U)  

DOE Green Energy (OSTI)

This Geothermal Logging Instrumentation Development Program Plan outlines a nine-year, industry-based program to develop and apply high temperature instrumentation technology which is needed by the borehole logging industry to serve the rapidly expanding geothermal market. Specifically, this program will upgrade existing materials and sondes to improve their high-temperature reliability. To achieve this goal specialized equipment such as high temperature electronics, cables and devices for measuring formation temperature, flow rate, downhole pressure, and fractures will be developed. In order to satisfy critical existing needs, the near-term (FY80) goal is for operation at or above 275/sup 0/C in pressures up to 48.3 MPa (7,000 psi). The long-term (FY84) goal is for operation up to 350/sup 0/C and 138 MPa (20,000 psi). This program plan has been prepared for the Department of Energy's Division of Geothermal Energy (DGE) and is a portion of the DGE long-range Geothermal Well Technology Program.

Veneruso, A.F.; Polito, J.; Heckman, R.C.

1978-08-01T23:59:59.000Z

177

Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan  

E-Print Network (OSTI)

and toward a low-energy service sector. In line with theseand toward a low-energy service sector. In line with theseand toward a low- energy service sector. In line with these

Ohshita, Stephanie

2011-01-01T23:59:59.000Z

178

Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan  

E-Print Network (OSTI)

economic energy intensity as an indicator for energy savingon industrial energy intensity as an indicator of savingsindustrial energy intensity as an indicator of savings

Ohshita, Stephanie

2011-01-01T23:59:59.000Z

179

Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan  

E-Print Network (OSTI)

World Resources Institute (WRI). 2009. Energy Consumption:Residential energy consumption per capita. WRI EarthTrendstargets. Total primary energy consumption is separated into

Ohshita, Stephanie

2011-01-01T23:59:59.000Z

180

Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan  

E-Print Network (OSTI)

2015. 23 In 2005, national energy consumption structure wasof: (a) national average annual energy consumption growthnational average) rate of change in energy consumption.

Ohshita, Stephanie

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Target Allocation Methodology for China's Provinces: Energy Intensity in the 12th FIve-Year Plan  

E-Print Network (OSTI)

of China’ s Energy-Saving and Emission Reductionrates: provincial trends Energy saving goals: equal ratesrates: provincial trends Energy saving goals: provincial

Ohshita, Stephanie

2011-01-01T23:59:59.000Z

182

Municipal Energy Plan Program (Ontario, Canada) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Municipal Energy Plan Program (Ontario, Canada) Municipal Energy Plan Program (Ontario, Canada) Municipal Energy Plan Program (Ontario, Canada) < Back Eligibility Municipal/Public Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Maximum Rebate 90,000 Program Info Expiration Date 11/29/2013 State Ontario Program Type Grant Program Rebate Amount 50 percent of eligible costs Ontario is supporting local energy planning by introducing the Municipal Energy Plan (MEP) program. The MEP program is designed to help municipalities better understand their local energy needs and conservation opportunities, set goals and develop implementation plans. A MEP takes an integrated approach to energy planning by aligning energy, infrastructure and land use planning. MEPs will help municipalities:

183

DOE Hydrogen and Fuel Cells Program Plan (September 2011)  

Fuel Cell Technologies Publication and Product Library (EERE)

The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities

184

Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program  

SciTech Connect

The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

1992-08-01T23:59:59.000Z

185

FY 1999 annual work plan for infrastructure program WBS 6  

SciTech Connect

The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

Donley, C.D.

1998-08-27T23:59:59.000Z

186

Multi-Year Program Plan, Building Regulatory Programs: 2010-2015  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Multi-Year Program Plan Multi-Year Program Plan - Building Regulatory Programs - U.S. Department of Energy - Energy Efficiency and Renewable Energy - Building Technologies Program - October 2010 [This plan will be updated based on actual appropriations, future budget requests and other program developments; the next significant revision is expected to be completed by spring 2011] 1 Building Regulatory Programs Multi Year Program Plan � Contents 1. Executive Summary ...................................................................................................................................................... 7 - 2. Introduction ...................................................................................................................................................................14

187

Second site-wide five-year review of cleanup at DOE�s Idaho site  

NLE Websites -- All DOE Office Websites (Extended Search)

NEWS MEDIA CONTACT: Danielle Miller (DOE-ID) 208-526-5709 FOR IMMEDIATE RELEASE: Thursday, February 3, 2011 Second site-wide five-year review of cleanup at DOE�s Idaho site completed; report now available online An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy�s (DOE) Idaho site. �This report verifies that the performance of cleanup actions at the Idaho Site continues to be protective of human health and the environment,� said Nicole Hernandez, DOE�s project manager for the five-year review. �The findings in the report demonstrate a strong collaborative effort by CH2M-WG Idaho (CWI), DOE, the Environmental Protection Agency (EPA), and the Idaho Department of Environmental Quality

188

Completion of the Five-Year Reviews for the Monticello, Utah, Radioactively  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completion of the Five-Year Reviews for the Monticello, Utah, Completion of the Five-Year Reviews for the Monticello, Utah, Radioactively Contaminated Properties Site (Monticello Vicinity Properties) and the Monticello Mill Tailings Site Completion of the Five-Year Reviews for the Monticello, Utah, Radioactively Contaminated Properties Site (Monticello Vicinity Properties) and the Monticello Mill Tailings Site October 16, 2012 - 2:58pm Addthis DOE will continue monitoring excavations in Monticello's streets and will dispose of tailings that are found that had been used for fill around utility lines. Monitoring of groundwater at the former mill site and treatment of contaminated water east of the mill site will also continue. DOE will continue monitoring excavations in Monticello's streets and will dispose of tailings that are found that had been used for fill around

189

Five Years of Building the Next Generation of Reactors | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Five Years of Building the Next Generation of Reactors Five Years of Building the Next Generation of Reactors Five Years of Building the Next Generation of Reactors August 15, 2012 - 5:17pm Addthis Simulated three-dimensional fission power distribution of a single 17x17 rod PWR fuel assembly. | Photo courtesy of the Consortium for Advanced Simulation of Light Water Reactors (CASL). Simulated three-dimensional fission power distribution of a single 17x17 rod PWR fuel assembly. | Photo courtesy of the Consortium for Advanced Simulation of Light Water Reactors (CASL). Doug Kothe Director, Consortium for Advanced Simulation of Light Water Reactors What are the key facts? CASL has the virtual capability to look closely at reactor core models. These models operate with 193 fuel assemblies, nearly 51,000 fuel rods, and about 18 million fuel pellets.

190

Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan  

SciTech Connect

The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

Nielsen, T. (EG and G Rocky Flats, Inc., Golden, CO (USA)); Waage, E.; Miller, D. (Stoller (S.M.) Corp., Boulder, CO (USA))

1990-01-01T23:59:59.000Z

191

N Reactor Deactivation Program Plan. Revision 4  

SciTech Connect

This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.

Walsh, J.L.

1993-12-01T23:59:59.000Z

192

Better Buildings Neighborhood Program: Step 7: Develop a Marketing Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

7: 7: Develop a Marketing Plan to someone by E-mail Share Better Buildings Neighborhood Program: Step 7: Develop a Marketing Plan on Facebook Tweet about Better Buildings Neighborhood Program: Step 7: Develop a Marketing Plan on Twitter Bookmark Better Buildings Neighborhood Program: Step 7: Develop a Marketing Plan on Google Bookmark Better Buildings Neighborhood Program: Step 7: Develop a Marketing Plan on Delicious Rank Better Buildings Neighborhood Program: Step 7: Develop a Marketing Plan on Digg Find More places to share Better Buildings Neighborhood Program: Step 7: Develop a Marketing Plan on AddThis.com... Getting Started Driving Demand Set Goals & Objectives Create an Evaluation Plan Conduct Audience Research Identify Target Audiences & Behavior Changes

193

LESSONS FROM FIVE YEARS OF EXPERIENCE IN ENERGY CONTRACT AUCTIONS IN SOUTH AMERICA  

E-Print Network (OSTI)

1 LESSONS FROM FIVE YEARS OF EXPERIENCE IN ENERGY CONTRACT AUCTIONS IN SOUTH AMERICA Rodrigo track record is somewhat mixed. For example, a 2005 World Bank report [2] surveyed the experiences) [5], Chile (2005) [6], Peru (2006) [7] and Colombia (2008) [8] have implemented energy forward

Rudnick, Hugh

194

Sun Labs-The First Five Years: The First Fifty Technical Reports. A Commemorative Issue  

Science Conference Proceedings (OSTI)

This commemorative issue in the technical report series encompasses the first five years of Sun Labs' existence from 1991 through 1996. In addition to the Abstracts of the first fifty reports, the contents include a list of patents issued during that ...

Ching-Chih Chang; Amy Hall; Jeanie Treichel

1998-09-01T23:59:59.000Z

195

Five Years of Cyclotron Radioisotope Production Experiences at the First PET-CT in Venezuela  

Science Conference Proceedings (OSTI)

Five years operation of a compact cyclotron installed at PET-CT facility in Caracas, Venezuela is given. Production rate of {sup 18}F labeled FDG, operation and radiation monitoring experience are included. We conclude that {sup 18}FDG CT-PET is the most effective technique for patient diagnosis.

Colmenter, L.; Coelho, D.; Esteves, L. M.; Ruiz, N.; Morales, L.; Lugo, I. [Centro Diagnostico Docente, Las Mercedes, Caracas (Venezuela); Sajo-Bohus, L.; Liendo, J. A.; Greaves, E. D.; Barros, H. [Universidad Simon Bolivar, Seccion de Fisica Nuclear, Caracas (Venezuela); Castillo, J. [University of Applied Science of Aachen (Germany)

2007-10-26T23:59:59.000Z

196

Mixed Waste Focus Area program management plan  

SciTech Connect

This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

Beitel, G.A.

1996-10-01T23:59:59.000Z

197

Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans  

Science Conference Proceedings (OSTI)

This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager.

Not Available

1980-01-01T23:59:59.000Z

198

Federal Energy Management Program: Portfolio-Based Planning Process for  

NLE Websites -- All DOE Office Websites (Extended Search)

Portfolio-Based Portfolio-Based Planning Process for Greenhouse Gas Mitigation to someone by E-mail Share Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Facebook Tweet about Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Twitter Bookmark Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Google Bookmark Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Delicious Rank Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on Digg Find More places to share Federal Energy Management Program: Portfolio-Based Planning Process for Greenhouse Gas Mitigation on

199

Resource Conservation and Recovery Act (RCRA). Facility Investigation Program Plan  

Science Conference Proceedings (OSTI)

This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication ``Characterization of Hazardous Waste Sites`` has been liberally adapted for use in this RFI Program Plan.

Not Available

1989-06-30T23:59:59.000Z

200

N reactor standby program plan: Part 3, Standby and surveillance  

Science Conference Proceedings (OSTI)

The N Reactor Standby Program Summary Plan is a description of the general policy and guidelines to be followed in placing the N Reactor in cold standby status. That Plan defines a number of objectives and activities necessary to achieve this goal. One of these activities is to layup the N Reactor operating systems in a cost-effective manner such that its safe restart may be assured. The Program Summary Plan has defined this activity as Standby and Surveillance and has directed that a Standby and Surveillance Program Plan be prepared to define and plan all of the activities necessary to accomplish this objective. This Plan responds to that commitment and supports the related policies and guidelines contained in the referenced Plan. In a manner similar to the referenced Program Plan, the Standby and Surveillance Program Plan is a description of the policies, guidelines, and methods of implementation to layup the N Reactor systems for cold standby. Accordingly, this Plan: Provides mission and objectives to guide system layup activities; Provides assumptions and criteria for layup; Defines the methodology for formulating the Program; Defines Program Baselines; Defines the method of performance of the Program; Provides for management, administrative control, and reporting requirements. Supporting details to these major elements of the Standby and Surveillance Program Plan are contained in the following sections.

NONE

1988-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Nuclear Safety Research and Development Program Operating Plan | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Operating Plan Program Operating Plan Nuclear Safety Research and Development Program Operating Plan July 5, 2012 Nuclear Safety Research and Development Program Operating Plan This operating plan outlines the mission, goals, and processes for the Department of Energy's (DOE) Nuclear Safety Research & Development (NSR&D) Program. This first version of the operating plan also discusses the startup phase of the program. NSR&D involves a systematic search for knowledge to advance the fundamental understanding of nuclear safety science and technology through scientific study, analysis, modeling, and experiments. Maintaining an effective NSR&D program will support DOE and the National Nuclear Security Administration (NNSA) in standards development, validation of analytical models and

202

Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000  

Science Conference Proceedings (OSTI)

This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

Not Available

1994-11-01T23:59:59.000Z

203

Recommendations for a US geothermal research plan. Volume 1  

DOE Green Energy (OSTI)

A multidisciplinary study team developed a comprehensive research program. Five- and ten-year program plans emphasize critical five-year milestones. Recommended plans are presented here under constraint of three different five-year budgets: $100, $300 and $500 million, respectively. Plans are detailed in six resource subprograms: high temperature water, moderate temperature water, hot dry rock, brine, geopressured, and dry steam. Also presented are plans for five subprograms common to all geothermal resources: exploration, assessment, drilling technology, environmental-social, and institutional. (MHR)

Burnham, J.B.; Bloomster, C.H.; Cohn, P.D.; Eliason, J.R.; Peterson, P.L.; Rohrmann, C.A.; Sandness, G.A.; Stewart, D.H.; Wallace, R.W.

1975-12-01T23:59:59.000Z

204

Environmental Restoration Quality Program Plan. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

Colley, J.S.

1992-08-01T23:59:59.000Z

205

Building Technologies Office: Program Plans, Implementation, and Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Plans, Implementation, and Results Program Plans, Implementation, and Results The Building Technologies Office (BTO) carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that guide, support, and document the program management process and associated results and public benefits. Program Overview Program Plans Program Implementation Program Results Relevant Laws Program Overview Documents Better Buildings, Brighter Future: an overview of BTO activities. Program Presentation: outlines the program's priorities and goals for improving the energy efficiency of buildings. Building Energy Codes Overview Energy Efficiency Trends in Residential and Commercial Buildings report: provides an overview of trends in the construction industry, including profiles of buildings and the resulting impacts on energy consumption.

206

Five-Year NRHP Re-Evaluation of Historic Buildings Assessment  

Science Conference Proceedings (OSTI)

The Lawrence Livermore National Laboratory (LLNL) 'Draft Programmatic Agreement among the Department of Energy and the California State Historic Preservation Officer Regarding Operation of Lawrence Livermore National Laboratory' requires a review and re-evaluation of the eligibility of laboratory properties for the National Register of Historic Places (NRHP) every five years. The original evaluation was published in 2005; this report serves as the first five-year re-evaluation. This re-evaluation includes consideration of changes within LLNL to management, to mission, and to the built environment. it also determines the status of those buildings, objects, and districts that were recommended as NRHP-eligible in the 2005 report. Buildings that were omitted from the earlier building list, those that have reached 50 years of age since the original assessment, and new buildings are also addressed in the re-evaluation.

Ullrich, R A; Heidecker, K R

2011-09-12T23:59:59.000Z

207

Quality assurance program plan for radionuclide airborne emissions monitoring  

SciTech Connect

This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements.

Boom, R.J.

1995-12-01T23:59:59.000Z

208

FY97 Geothermal R&D Program Plan  

SciTech Connect

This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

None

1996-09-01T23:59:59.000Z

209

Review of Conservation Costs and Benefits: Five Years of Experience under the Northwest Power Act  

E-Print Network (OSTI)

In 1980, Congress passed the Pacific Northwest Electric Power Planning and Conservation Act (Public Law 96-501). In the Act, Congress mandated that conservation (i.e., improvements in energy efficiency that result in reduced consumptions) be treated as a resource and that all resources be evaluated against uniform criteria to determine the lowest cost mix of resources to meet the Northwest’s energy needs. Since the passage of the Act, the total regional expenditure on conservation by the federal Bonneville Power Administration, public utilities, and investor-owned utilities has been approximately $800 million to $900 million. This includes research and development elements of the program. This paper describes the costs and benefits of conservation programs implemented in the Pacific Northwest and some of the lessons learned to date. The analysis indicates that conservation programs that were run to acquire energy have achieved savings at levelized costs ranging between 1.9 and 2.9 cents per kilowatt hours. Research, development and pilot projects have produced savings at costs that range from less than .10 cents to 8.9 cents per kilowatt hour. Based on the results described in this paper, the Northwest Power Planning Council has concluded that conservation is indeed a resource that the Pacific Northwest can rely on to help meet future needs for electricity. The Council also concluded the region will be able secure conservation measure and resources at a cost lower than it would otherwise have to pay for additional generating resources.

Sheets, E.

1988-09-01T23:59:59.000Z

210

Storm Water Management Plan Program (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Storm Water Management Plan Program (Nebraska) Storm Water Management Plan Program (Nebraska) Storm Water Management Plan Program (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Grant Program Provider Natural Resources This legislation implements the National Pollutant Discharge Elimination

211

California Nonpoint Source Program Plan | Open Energy Information  

Open Energy Info (EERE)

Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon California Nonpoint Source Program Plan Jump to: navigation, search GEOTHERMAL ENERGYGeothermal...

212

Quality Assurance Program Plan for FFTF effluent controls. Revision 1  

SciTech Connect

This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification.

Seamans, J.A.

1995-06-08T23:59:59.000Z

213

Guadalupe Valley Electric Cooperative- Conservation Plan 7 Loan Program  

Energy.gov (U.S. Department of Energy (DOE))

Guadalupe Valley Electric Cooperative offers an incentive for members to increase the energy efficiency of existing homes and facilities through the Conservation Plan 7 Loan Program. The loan...

214

FY14 Affirmative Action Program Plan for Disabled Veterans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY14 Affirmative Action Program Plan for FY14 Affirmative Action Program Plan for Disabled Veterans 1. PURPOSE: This Affirmative Action Program Plan for Disabled Veterans (Plan) establishes policy and procedures, identifies responsibilities, and in connection with the Department of Energy Operational Plan and Desktop Reference for the Veterans Employment Initiative sets objectives for the Department of Energy (DOE). It has become an attachment to the Operational Plan. 2. SCOPE: The Plan is to serve as the guide for the Disabled Veterans' Affirmative Action Program (DVAAP) for all elements of the Department of Energy (DOE). 3. REFERENCES: A. Equal Employment Opportunity Commission (EEOC) Management Directive (MD) 715 and Guidance: http://www.eeoc.gov/federal/directives/md715instruct.cfm.

215

Federal Technical Capabilities Program (FTCP) 2004 Annual Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Technical Capalbility Program Federal Technical Capalbility Program Fiscal Year (FY) 2004 Annual Plan November 20,2003 FTCP Annual Plan. FY 2004 INTRODUCTION The objective of the Federal Technical Capability Program (Program) is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The current Program was formalized in 1998 through Department directives DOE P 426.1, Federal Technical Capability Program for Defense Nuclear Facilities, and DOE M 426. l-l, Federal Technical Capability Manual. The Federal Technical Capability Panel (FTCP) provides leadership in implementing the Program. The FTCP consists of senior technical safety managers representing nuclear facilities,

216

SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Planning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SYSTEMS ENGINEERING PROGRAM: Requirements Management Checklist SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Project Tracking Checklist Energy.gov Careers & Internships Policy &...

217

N reactor standby program plan: Part 2, Transition to standby  

Science Conference Proceedings (OSTI)

The N Reactor Standby Program is the Westinghouse Hanford Company (WHC) program to prepare the N Reactor for cold standby in a cost effective and quality manner with a primary emphasis on safety. The N Reactor Standby Program is comprised of five parts or subprograms, of which the Transition to Standby Program is part two. Transition to Standby is that part of the overall program that encompasses the on-going operational and maintenance activities required to maintain safe control of the reactor and support facilities until their layup is complete. The Transition to Standby Program Plan has been developed to outline the program plans, baselines, and controls to be employed in the management of the Transition to Standby Program. This plan also defines the roles and responsibilities of the major program participants.

Slinn, S.A.

1988-09-01T23:59:59.000Z

218

GEOTHERMAL RESERVOIR ENGINEERING MANGEMENT PROGRAM PLAN (GREMP PLAN)  

E-Print Network (OSTI)

2 Mission of Division of Geothermal Energy . . . . .Coordination with Other Geothermal Programs . . . . . . 6the Behavior of Geothermal Systems . . . . . . . . . 1 6

Bloomster, C.H.

2010-01-01T23:59:59.000Z

219

Operational Plan and Desktop Reference for the Veterans Employment Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Desktop Reference for the Veterans Employment Operational Plan and Desktop Reference for the Veterans Employment Program Operational Plan and Desktop Reference for the Veterans Employment Program DOE Guide to the President's Initiative for Veterans Employment. Includes: Department-wide policies and procedures, goals and objectives, DVAAP, information on veterans' preference and special hiring authorities, procedures for use of vocational rehabilitation programs, sources for finding veterans, and links to websites. Operational Plan and Desktop Reference for the Veterans Employment Program Responsible Contacts Donna Friend HUMAN RESOURCES SPECIALIST E-mail donna.friend@hq.doe.dov Phone 202-586-5880 More Documents & Publications Operational Plan and Desktop Reference for the Disability Employment Program

220

Operational Plan and Desktop Reference for the Veterans Employment Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Desktop Reference for the Veterans Employment Operational Plan and Desktop Reference for the Veterans Employment Program Operational Plan and Desktop Reference for the Veterans Employment Program DOE Guide to the President's Initiative for Veterans Employment. Includes: Department-wide policies and procedures, goals and objectives, DVAAP, information on veterans' preference and special hiring authorities, procedures for use of vocational rehabilitation programs, sources for finding veterans, and links to websites. Operational Plan and Desktop Reference for the Veterans Employment Program Responsible Contacts Donna Friend HUMAN RESOURCES SPECIALIST E-mail donna.friend@hq.doe.dov Phone 202-586-5880 More Documents & Publications Operational Plan and Desktop Reference for the Disability Employment Program

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Environmental Restoration Remedial Action Program records management plan  

SciTech Connect

The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan ((FOMP) DOE-RL 1989) describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document ((QARD) DOE-RL 1991), provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig.

Michael, L.E.

1991-07-01T23:59:59.000Z

222

Biomass Multi-Year Program Plan  

E-Print Network (OSTI)

In recent years, biomass-derived fuels have received increasing attention as one solution to our nation’s continued and growing dependence on imported oil, which exposes the country to critical disruptions in fuel supply, creates economic and social uncertainties for businesses and individuals, and impacts our national security. The Energy Independence and Security Act of 2007 (EISA) aims to increase the supply of alternative fuels by setting a mandatory Renewable Fuel Standard (RFS) requiring transportation fuel sold in the U.S. to contain a minimum of 36 billion gallons of renewable fuels, including advanced and cellulosic biofuels and biomass-based diesel, by 2022. President Obama has affirmed his support for advanced biofuels as part of his commitment to “invest in a clean energy economy that will lead to new jobs, new businesses and reduce our dependence on foreign oil. " 1 Program Goals The U.S. Department of Energy (DOE) recognizes the importance of a diverse energy portfolio in meeting the nation’s energy security challenges. DOE has, therefore, set a goal in its Strategic Plan to promote energy security through a diverse energy supply that is reliable, clean, and affordable. As a key strategy for attaining both EISA and Department goals, the DOE Office of

unknown authors

2009-01-01T23:59:59.000Z

223

Biomass Multi-Year Program Plan  

E-Print Network (OSTI)

In recent years, biomass-derived fuels have received increasing attention as one solution to our nation’s continued and growing dependence on imported oil, which exposes the country to critical disruptions in fuel supply, creates economic and social uncertainties for businesses and individuals, and impacts our national security. The Energy Independence and Security Act of 2007 (EISA) aims to increase the supply of alternative fuels by setting a mandatory Renewable Fuel Standard (RFS) requiring transportation fuel sold in the U.S. to contain a minimum of 36 billion gallons of renewable fuels, including advanced and cellulosic biofuels and biomass-based diesel, by 2022. President Obama has affirmed his support for advanced biofuels as part of his commitment to “invest in a clean energy economy that will lead to new jobs, new businesses and reduce our dependence on foreign oil. " 1 Program Goals The U.S. Department of Energy (DOE) recognizes the importance of a diverse energy portfolio in meeting the nation’s energy security challenges. DOE has, therefore, set a goal in its Strategic Plan to promote energy security through a diverse energy supply that is reliable, clean, and affordable. As a key strategy for attaining both EISA and Department goals, the DOE Office of

unknown authors

2010-01-01T23:59:59.000Z

224

Office of Legacy Management: The First Five Years FY 2004¬タモ2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S S . D E PA R T M E NT O F U. S . D E PA R T M E NT O F ENERGY ENERGY Managing Today's Change, Protecting Tomorrow's Future Managing Today's Change, Protecting Tomorrow's Future DOE/LM-1461 Office of Legacy Management FY 2004-2008 The First Five Years Front cover photos top to bottom: Rocky Flats, Colorado, site and the Fernald Preserve Visitors Center in Ohio. Back cover photos top to bottom: Pinellas, Florida, site and the Rifle, Colorado, site. This report covers the time period from December 2003 (FY 2004) through September 2008 (FY 2008). DOE/LM-1461 December 2008 www.LM.doe.gov Office of Legacy Management The First Five Years FY 2004-2008 ENERGY Office of Legacy Management U.S. DEPARTMENT OF Letter From the Director The U.S. Department of Energy (DOE) established the Office of Legacy Management (LM) on December 15, 2003, to provide a long-term, sustainable solution

225

Light Water Reactor Sustainability Program Integrated Program Plan  

SciTech Connect

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

Kathryn McCarthy; Jeremy Busby; Bruce Hallbert; Shannon Bragg-Sitton; Curtis Smith; Cathy Barnard

2013-04-01T23:59:59.000Z

226

Office of UNF Disposition International Program - Strategic Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UNF Disposition International Program - Strategic Plan UNF Disposition International Program - Strategic Plan Office of UNF Disposition International Program - Strategic Plan The Department of Energy's Office of Nuclear Energy, Used Nuclear Fuel Disposition Research and Development Office (UFD), performs the critical mission of addressing the need for an integrated strategy that combines safe storage of spent nuclear fuel with expeditious progress toward siting and licensing a disposal facility or facilities. The UFD International Program plays a key role in this effort. International collaboration provides a forum for exchanging strategies, expertise, and technologies with other nations that have also been investigating solutions to the problems of nuclear waste disposal-information that otherwise would have

227

Nuclear Safety Reserch and Development Program Operating Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Research and Development Safety Research and Development Program Operating Plan Office of Nuclear Safety Office of Health, Safety and Security U.S. Department of Energy June 2012 INTENTIONALLY BLANK NSR&D Program Operating Plan June 2012 Table of Contents 1.0 INTRODUCTION................................................................................................................. 1 2.0 BACKGROUND ................................................................................................................... 1 3.0 OBJECTIVES ....................................................................................................................... 2 4.0 NSR&D PROGRAM PROCESSES .................................................................................... 3

228

Sandia wind program FY94 annual operating plan  

SciTech Connect

This document presents the objectives, accomplishments and activity plan for the Sandia Wind Energy Technology Program. The status of the current program is summarized and the planned FY94 activities are defined. Appendices detailing the cost, performance and schedule associated with these activities are also included. Funding requirements are given for several scenarios in order to reflect the impact of funding variability on program progress.

Dodd, H.M.

1993-10-01T23:59:59.000Z

229

Review and summary of Solar Thermal Conversion Program planning assistance  

DOE Green Energy (OSTI)

The Solar Thermal Conversion Program comprises a major part of the national solar energy program which must be continuously reviewed and modified where necessary. Modifications are typically required to reflect technical achievements and uncertainties which arise from within the program or from other technical programs, changes in budgets available for supporting the program as well as internal program funding priorities, changing goals such as through acceleration or stretch-out of the program schedule, significant organizational changes involving responsible governmental agencies, the introduction of new project management support contractors, and required budget or schedule changes occurring within individual projects that make up the Solar Thermal Conversion Program. The Aerospace Corporation has provided data to assist in planning, review, coordination, and documentation of the overall Solar Thermal Conversion Program. The Solar Thermal Conversion Program Plan is described in detail. Sections 2.0 through 5.0 cover the discussion and detail planning covering the objectives, justification, basic and alternative plans, budgets, and schedules for the Solar Thermal sub-unit portion of the Solar Electric Applications effort. Appendices B1, B2, and B3 include the March 21, March 28, and April 5, 1975, Program Plan submissions of the complete Solar Electric Applications effort. In Appendix B the Solar Thermal, Solar Photovoltaic, Wind Energy, and Ocean Thermal sub-unit texts have been condensed and formatted for integration in the overall ERDA budget package. (WHK)

Not Available

1975-06-01T23:59:59.000Z

230

DOE Releases Climate Change Technology Program Strategic Plan | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Releases Climate Change Technology Program Strategic Plan Releases Climate Change Technology Program Strategic Plan DOE Releases Climate Change Technology Program Strategic Plan September 20, 2006 - 9:01am Addthis Plan Outlines Strategies for Reducing Greenhouse Gas Emissions through Development and Deployment of Advanced Technologies WASHINGTON, DC - The U.S. Department of Energy (DOE) today released the Climate Change Technology Program (CCTP) Strategic Plan, which details measures to accelerate the development and reduce the cost of new and advanced technologies that avoid, reduce, or capture and store greenhouse gas emissions. CCTP is the technology component of a comprehensive U.S. strategy introduced by President Bush in 2002 to combat climate change that include measures to slow the growth of greenhouse gas emissions through

231

Mission Plan for the Civilian Radioactive Waste Management Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mission Plan for the Civilian Radioactive Waste Management Program Mission Plan for the Civilian Radioactive Waste Management Program Mission Plan for the Civilian Radioactive Waste Management Program Summary In response to the the requirement of the Nuclear Waste Policy Act of 1982, the Office of Civilian Radioactive Waste Management in the Department of Energy (DOE) has prepared this Mission Plan for the Civilian Radioactive Waste Management Program. The Mission Plan is divided into two parts. Part I describes the overall goals, objectives, and strategy for the disposal of spent nuclear fuel and high-level waste. It explains that, to meet the directives of the Nuclear Waste Policy Act, the DOE intends to site, design, construct., and start operating a mined geologic repository by January 31, 1998. The Act specifies that the costs of these

232

The Department of Energy Hydrogen and Fuel Cells Program Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Hydrogen and Fuel Cells Program Plan Hydrogen and Fuel Cells Program Plan An Integrated Strategic Plan for the Research, Development, and Demonstration of Hydrogen and Fuel Cell Technologies September 2011 The Department of Energy Hydrogen and Fuel Cells Program Plan Department of Energy Hydrogen and Fuel Cells Program Plan The need for clean, sustainable, and domestically produced energy has never been greater. The call for green jobs and U.S. leadership in clean energy, combined with the need to reduce emissions and our growing dependence on imported oil, have come together to form a powerful imperative-one that demands new technologies and new approaches for the way we produce and use energy. Congress has led the call for the development of clean, domestic sources of energy with the Energy Policy Act of 2005 (EPACT), the

233

Program Execution Plan Mission Support Organizations  

NLE Websites -- All DOE Office Websites (Extended Search)

Gas Use and Distribution o Building Utility Maintenance * FNAL Assurance Council Enterprise Risk: o Effective ESH support and planning with changing projects: NEPA especially...

234

Light Water Reactor Sustainability Program Integrated Program Plan  

Science Conference Proceedings (OSTI)

Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

George Griffith; Robert Youngblood; Jeremy Busby; Bruce Hallbert; Cathy Barnard; Kathryn McCarthy

2012-01-01T23:59:59.000Z

235

Federal Technical Capabilities Program (FTCP) 2005 Annual Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Technical Capability Program Fiscal Year (FY) 2005 Annual Plan January 15, 2005 FTCP Annual Plan, FY 2005 INTRODUCTION The objective of the Federal Technical Capability Program (Program) is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the U.S. Department of Energy (also known as the "Department" or DOE) missions and responsibilities. The current Program was formalized in 1998 through Department directives DOE Policy 426.1, Federal Technical Capability Program for Defense Nuclear Facilities, and DOE Manual (M) 426.1-1A, Federal Technical Capability Manual. The Federal Technical Capability Panel (FTCP) provides leadership in implementing the

236

Five-Year Review of CERCLA Response Actions at the Idaho National Laboratory  

SciTech Connect

This report summarizes the documentation submitted in support of the five-year review or remedial actions implemented under the Comprehensive Environmental Response, Compensation, and Liability Act Sitewide at the Idaho National Laboratory. The report also summarizes documentation and inspections conducted at the no-further-action sites. This review covered actions conducted at 9 of the 10 waste area groups at the Idaho National Laboratory, i.e. Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 9, and 10. Waste Area Group 8 was not subject to this review, because it does not fall under the jurisdiction of the U.S. Department of Energy Idaho Operations Office. The review included past site inspections and monitoring data collected in support of the remedial actions. The remedial actions have been completed at Waste Area Groups 2, 4, 5, 6, and 9. Remedial action reports have been completed for Waste Area Groups 2 and 4, and remedial action reports are expected to be completed during 2005 for Waste Area Groups 1, 5, and 9. Remediation is ongoing at Waste Area Groups 3, 7, and 10. Remedial investigations are yet to be completed for Operable Units 3-14, 7-13/14, and 10-08. The review showed that the remedies have been constructed in accordance with the requirements of the Records of Decision and are functioning as designed. Immediate threats have been addressed, and the remedies continue to be protective. Potential short-term threats are being addressed though institutional controls. Soil cover and cap remedies are being maintained properly and inspected in accordance with the appropriate requirements. Soil removal actions and equipment or system removals have successfully achieved remedial action objectives identified in the Records of Decision. The next Sitewide five-year review is scheduled for completion by 2011.

W. L. Jolley

2007-02-01T23:59:59.000Z

237

Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Methane Hydrate Multi-Year R&D Program Plan NATIONAL METHANE HYDRATE MULTI-YEAR R&D PROGRAM PLAN U.S. Department of Energy Office of Fossil Energy Federal Energy Technology Center...

238

GEOTHERMAL RESERVOIR ENGINEERING MANGEMENT PROGRAM PLAN (GREMP PLAN)  

E-Print Network (OSTI)

analysis. (NOTE: See 1976 Sandia Albuquerque workshop onCalifornia, April 13-15, 1977. b Sandia Lab Report (SAND 75-n g Development Program a t Sandia L a b o r a t o r i e s ,

Bloomster, C.H.

2010-01-01T23:59:59.000Z

239

Energy Storage Program Planning Document | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Storage Program Planning Document Energy Storage Program Planning Document Energy Storage Program Planning Document Energy storage systems have the potential to extend and optimize the operating capabilities of the grid, since power can be stored and used at a later time. This allows for flexibility in generation and distribution, improving the economic efficiency and utilization of the entire system while making the grid more reliable and robust. Additionally, alternatives to traditional power generation, including variable wind and solar energy technologies, may require back-up power storage. Thus, modernizing the power grid may require a substantial volume of electrical energy storage (EES). Energy Storage Program Planning Document More Documents & Publications CX-008689: Categorical Exclusion Determination

240

Energy Storage Program Planning Document | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Storage Program Planning Document Energy Storage Program Planning Document Energy Storage Program Planning Document Energy storage systems have the potential to extend and optimize the operating capabilities of the grid, since power can be stored and used at a later time. This allows for flexibility in generation and distribution, improving the economic efficiency and utilization of the entire system while making the grid more reliable and robust. Additionally, alternatives to traditional power generation, including variable wind and solar energy technologies, may require back-up power storage. Thus, modernizing the power grid may require a substantial volume of electrical energy storage (EES). Energy Storage Program Planning Document More Documents & Publications CX-010738: Categorical Exclusion Determination

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Highly enriched uranium (HEU) storage and disposition program plan  

SciTech Connect

Recent changes in international relations and other changes in national priorities have profoundly affected the management of weapons-usable fissile materials within the United States (US). The nuclear weapon stockpile reductions agreed to by the US and Russia have reduced the national security requirements for these fissile materials. National policies outlined by the US President seek to prevent the accumulation of nuclear weapon stockpiles of plutonium (Pu) and HEU, and to ensure that these materials are subjected to the highest standards of safety, security and international accountability. The purpose of the Highly Enriched Uranium (HEU) Storage and Disposition Program Plan is to define and establish a planned approach for storage of all HEU and disposition of surplus HEU in support of the US Department of Energy (DOE) Fissile Material Disposition Program. Elements Of this Plan, which are specific to HEU storage and disposition, include program requirements, roles and responsibilities, program activities (action plans), milestone schedules, and deliverables.

Arms, W.M.; Everitt, D.A.; O`Dell, C.L.

1995-01-01T23:59:59.000Z

242

Federal Geothermal Program Plan for Fiscal Year 1983  

SciTech Connect

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This is a report of the Interagency Geothermal Coordinating Committee (IGCC). (DJE 2005)

None

1983-03-01T23:59:59.000Z

243

Program Plan Reports | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

status of various programs. For more information, select one of the following. Audited financial statements for the benefit plans supported by B&W Y-12, L.L.C. are also...

244

Microsoft Word - MAaD_Pathway_Program_Plan_2012_Final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Degradation Technical Program Plan September 2012 U.S. Department of Energy Office of Nuclear Energy DISCLAIMER This information was prepared as an account of work sponsored by an...

245

1997 Operating plan for the Office of International Health Programs  

Science Conference Proceedings (OSTI)

One year ago, the Office of International Health Programs provided you with our 1996 Operating Plan, which defined our ideas and ideals for conducting business in 1996. We have again this year undertaken an intensive planning effort, first reviewing our accomplishments and shortcomings during 1996, and then developing plans and priorities for the upcoming year, taking into account input from customers and outside review panels, and ensuring that the demands on the office have been balanced with anticipated human, financial, and material resources.

NONE

1996-11-01T23:59:59.000Z

246

Objectives and strategies of the International Photovoltaic Program Plan  

SciTech Connect

The Solar Photovoltaic Energy Research, Development, and Demonstration (RD and D) Act of 1978 calls for the Secretary of the US Department of Energy (DOE) to prepare a plan to demonstrate photovoltaic systems in other nations and to facilitate the widespread use of these systems. The objective of the International Photovoltaic Program Plan, the strategies that will be used in the plan, and the approach that is being taken to prepare the plan are described. Background on photovoltaic technology and markets and the DOE domestic photovoltaic effort is also provided. The International Photovoltaic Program Plan will complement the DOE domestic activities to stimulate international markets. A number of national and international benefits could result if the objective of accelerating the widespread use of photovoltaic systems in international markets is realized. A primary benefit is that foreign markets may help stabilize the US photovoltaic industry and foster its expansion. Other benefits include contributions to the advancement of developing countries, reductions in world oil imports, and improvements in the US balance of trade. Strategies to be addressed in the plan are photovoltaic system demonstrations, systems development, information gathering and dissemination, financial incentives, and administrative actions. A critical aspect of the plan will be the coordination of selected programs and the monitoring and assessment of the plan's results. Analyses of international markets, international financial institutions, foreign competition, international marketing experiences of other US industries, and system development needs have been initiated to support the plan.

Costello, D.; Posner, D.; Koontz, R.; Heiferling, P.; Carpenter, P.; Perelman, L.

1979-07-01T23:59:59.000Z

247

Planning guidance for the Chemical Stockpile Emergency Preparedness Program  

Science Conference Proceedings (OSTI)

This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others] and others

1995-02-01T23:59:59.000Z

248

A Climatology of Disdrometer Measurements of Rainfall in Finland over Five Years with Implications for Global Radar Observations  

Science Conference Proceedings (OSTI)

To improve the understanding of high-latitude rain microphysics and its implications for the remote sensing of rainfall by ground-based and spaceborne radars, raindrop size measurements have been analyzed that were collected over five years with a ...

Jussi Leinonen; Dmitri Moisseev; Matti Leskinen; Walter A. Petersen

2012-02-01T23:59:59.000Z

249

CRAD, Self-Assessment Program Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Assessment Program Assessment Plan Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect

250

Municipal Energy Plan Program (Ontario, Canada) | Open Energy Information  

Open Energy Info (EERE)

Municipal Energy Plan Program (Ontario, Canada) Municipal Energy Plan Program (Ontario, Canada) No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Last modified on August 29, 2013. EZFeed Policy Place Ontario Applies to States or Provinces Ontario Name Municipal Energy Plan Program (Ontario, Canada) Policy Category Financial Incentive Policy Type Grant Program Affected Technologies Biomass/Biogas, Concentrating Solar Power, Energy Storage, Fuel Cells, Geothermal Electric, Hydroelectric, Hydroelectric (Small), Solar Photovoltaics, Tidal Energy, Wave Energy, Wind energy Active Policy Yes Implementing Sector State/Province Amount 50 percent of eligible costs Expiration Date 11/29/2013 Maximum Incentive 90,000 Program Administrator Ontario Ministry of Energy

251

CRAD, Self-Assessment Program Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Assessment Program Assessment Plan Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of programs, systems, and work processes. DOE O 414.1A, Criterion 9 (a) An effective assessment and safety management program shall focus on achieving DOE/NNSA expectations through federal regulations and standards. DOE O 414.1A, Criterion 9 (a) An effective assessment supports management's goal to protect

252

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan To address the challenges associated with pursuing commercial nuclear power plant operations beyond 60 years, the U.S. Department of Energy's (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs: DOE-NE's Light Water Reactor Sustainability (LWRS) Program and EPRI's Long-Term Operations (LTO) Program. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a Memorandum of Understanding in late 2010 to "establish guiding principles under which research activities (between LWRS and LTO) could be

253

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan To address the challenges associated with pursuing commercial nuclear power plant operations beyond 60 years, the U.S. Department of Energy's (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs: DOE-NE's Light Water Reactor Sustainability (LWRS) Program and EPRI's Long-Term Operations (LTO) Program. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a Memorandum of Understanding in late 2010 to "establish guiding principles under which research activities (between LWRS and LTO) could be

254

Fuel Cell Technologies Office: Program Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

within the EERE Fuel Cell Technologies Office and the DOE offices of Nuclear Energy, Fossil Energy, and Science. It describes the Program's activities, the specific obstacles...

255

Vehicle Technologies Office: Program Plans, Implementation, and...  

NLE Websites -- All DOE Office Websites (Extended Search)

Motors Annual Progress Report The Advanced Power Electronics and Electric Motors (APEEM) program within the DOE Vehicle Technologies Office (VTO) provides support and...

256

Extragalactic Point Source Search in Five-year WMAP 41, 61 and 94 GHz Maps  

E-Print Network (OSTI)

We present the results of an extragalactic point source search using the five-year WMAP 41, 61 and 94 GHz (Q-, V- and W-band) temperature maps. This work is an extension of our point source search in the WMAP maps applying a CMB-free technique. An internal linear combination (ILC) map has been formed from the three-band maps, with the weights chosen to remove the CMB anisotropy signal as well as to favor a selection of flat-spectrum sources. We find 381 sources at the > 5 sigma level outside the WMAP point source detection mask in the ILC map, among which 89 are "new" (i.e., not present in the WMAP catalog). Source fluxes have been calculated and corrected for the Eddington bias. We have solidly identified 367 (96.3%) of our sources. The 1 sigma positional uncertainty is estimated to be 2'. The 14 unidentified sources could be either extended radio structure or obscured by Galactic emission. We have also applied the same detection process on simulated maps and found 364+/-21 detections on average. The recovered source distribution N(>S) agrees well with the simulation input, which proves the reliability of this method.

Xi Chen; Edward L. Wright

2008-09-23T23:59:59.000Z

257

Performance Assessment Strategy Plan for the Geologic Repository Program  

Science Conference Proceedings (OSTI)

Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs.

NONE

1990-01-01T23:59:59.000Z

258

Short-term hydropower production planning by stochastic programming  

Science Conference Proceedings (OSTI)

Within the framework of multi-stage mixed-integer linear stochastic programming we develop a short-term production plan for a price-taking hydropower plant operating under uncertainty. Current production must comply with the day-ahead commitments of ... Keywords: Hydropower, OR in energy, Scenarios, Stochastic programming

Stein-Erik Fleten; Trine Krogh Kristoffersen

2008-08-01T23:59:59.000Z

259

Oil program implementation plan FY 1996--2000  

SciTech Connect

This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

NONE

1995-04-01T23:59:59.000Z

260

Program Development Plan and Team up  

DOE Green Energy (OSTI)

The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

Solar Electric Power Association

2001-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Los Alamos National Laboratory Transuranic Waste Program Exceeds Planned  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Alamos National Laboratory Transuranic Waste Program Exceeds Los Alamos National Laboratory Transuranic Waste Program Exceeds Planned Shipping Goal Los Alamos National Laboratory Transuranic Waste Program Exceeds Planned Shipping Goal May 1, 2012 - 12:00pm Addthis LOS ALAMOS, N.M. - Los Alamos National Laboratory's (LANL) Transuranic (TRU) Waste Program is looking at another record-setting month for the amount of TRU waste leaving Material Disposal Area G, headed to the Waste Isolation Pilot Plant (WIPP) for permanent disposal. LANL exceeded its planned removal of TRU waste from Area G in April, shipping more than 91 cubic meters of waste to WIPP - more than the Lab has ever shipped there in a single month. The Lab is headed for an even more successful May, with 99 cubic meters shipped to WIPP as of May 22. "Our shipping performance reflects the acceleration that began last

262

IT Capital Planning Corporate Management Improvement Program (CMIP) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IT Capital Planning Corporate Management Improvement Program (CMIP) IT Capital Planning Corporate Management Improvement Program (CMIP) IT Capital Planning Corporate Management Improvement Program (CMIP) The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the end of their life cycles. An investment to replace and modernize severely outdated information technology (IT) systems would prove a much more efficient expenditure of scarce IT dollars than the continued enhancement, maintenance, and operation of legacy systems. CMIP is an initiative to modernize and improve software applications, hardware, and infrastructure which support a wide range of Department-wide IT based business systems. CMIP permits the

263

Selenide isotope generator for the Galileo mission. Reliability program plan  

DOE Green Energy (OSTI)

The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineated herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.

Not Available

1978-10-01T23:59:59.000Z

264

© 2007 BioMed Central Ltd Five years ago this month, Journal of Biology was launched under the guidance  

E-Print Network (OSTI)

premier biology journal of the open access publisher BioMed Central, the publisher of Genome Biology and the BMC series of journals. As we celebrate Journal of Biology’s birthday, we take this opportunity to reflect on the first five years during which the journal has published articles of exceptional interest across the full spectrum of biology. In its first year of publication, Journal of Biology aimed very high and although it considered many manuscripts, it published only six original research articles of remarkably broad interest and importance, each accompanied by a minireview and a research news article that put the work in context for a broader audience. That these were truly exceptional articles is not in doubt: the first, by Paul Spellman and Gerry Rubin (Evidence for large domains of similarly expressed genes in the Drosophila genome [1]) has been accessed more than 28,000 times from our site alone. Like all Journal of Biology content it is also freely available from PubMed Central and other mirror sites, so we do not know how many people have downloaded it in total. According to the Institute for Scientific Information (ISI) [2], it has been cited over 190 times. Please see Box 1 for a selection of research articles and the number of times they have been cited and accessed. Publishing on average only every two months has its perils, however: both authors and readers told us that they’d be happier to see a journal that wasn’t so very selective and published more often. The journal is now planning to build on its success in publishing high-quality articles and is striving to increase the rate of publication, while maintaining a very high standard. “(Our article) has already been cited at least 8 times in the first 4 months after publication.”

Of Editor-in-chief Martin Raff; Theodora Bloom As The; Dario Alessi

2007-01-01T23:59:59.000Z

265

Tanks focus area multiyear program plan - FY96-FY98  

SciTech Connect

The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary.

NONE

1995-07-01T23:59:59.000Z

266

Mixed Waste Integrated Program Quality Assurance requirements plan  

SciTech Connect

Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

1994-04-15T23:59:59.000Z

267

Hanford Site waste tank farm facilities design reconstitution program plan  

SciTech Connect

Throughout the commercial nuclear industry the lack of design reconstitution programs prior to the mid 1980`s has resulted in inadequate documentation to support operating facilities configuration changes or safety evaluations. As a result, many utilities have completed or have ongoing design reconstitution programs and have discovered that without sufficient pre-planning their program can be potentially very expensive and may result in end-products inconsistent with the facility needs or expectations. A design reconstitution program plan is developed here for the Hanford waste tank farms facility as a consequence of the DOE Standard on operational configuration management. This design reconstitution plan provides for the recovery or regeneration of design requirements and basis, the compilation of Design Information Summaries, and a methodology to disposition items open for regeneration that were discovered during the development of Design Information Summaries. Implementation of this plan will culminate in an end-product of about 30 Design Information Summary documents. These documents will be developed to identify tank farms facility design requirements and design bases and thereby capture the technical baselines of the facility. This plan identifies the methodology necessary to systematically recover documents that are sources of design input information, and to evaluate and disposition open items or regeneration items discovered during the development of the Design Information Summaries or during the verification and validation processes. These development activities will be governed and implemented by three procedures and a guide that are to be developed as an outgrowth of this plan.

Vollert, F.R.

1994-09-06T23:59:59.000Z

268

DOE Hydrogen and Fuel Cells Program: Program Plans, Roadmaps...  

NLE Websites -- All DOE Office Websites (Extended Search)

Roadmaps, and Vision Documents Program Records Annual Progress Reports Annual Merit Review and Peer Evaluation Reports to Congress Policies and Acts Financial Opportunities...

269

Fiscal year 1986 program plan for the Defense Transuranic Waste Program (DTWP)  

SciTech Connect

The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy is national planning, integration, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 86 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of all R D activities meet requirements tated in the Technical Management Plan for the Transuranic Waste Management Program. The Program Plan is revised as needed. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 86; outyear budget projections are presented for future years.

1985-11-01T23:59:59.000Z

270

Functional Analysis and Thermal-Hydraulics Program Plan  

SciTech Connect

The purpose of this document is to set forth the Program Plan for the Functional Analysis and Thermal-Hydraulics (FA&TH) Program (herein after referred to as the {open_quotes}Program{close_quotes}) for the 5 year period covering fiscal years 1992 thru 1996. Specifically, the actions planned by the Safety Analysis Group (SAG) of the Reactor Safety Research Section within SRTC will be identified, defined, and a schedule and resource projection presented. This document will be used by the Reactor Safety Research Section management as the baseline definition for the Program`s scope, schedule and cost. Annual budget and staffing requests will be submitted based on this approved baseline. Status reporting and progress monitoring will be performed against this approved baseline. This Program plan will be revised as needed to reflect the changes that come about due to Program redirection. The Program`s primary mission is to provide further assurance that the Savannah River Site K-Reactor is designed, modified, operated and maintained in a safe, cost-effective manner through application of functional analysis methodology and continued development of thermal hydraulic support capabilities. It is envisioned that the Program will continue throughout the operating life of K-Reactor and have a permanent staff of eight: one lead and seven engineers. The Program has two primary elements; (1) functional analysis, and (2) thermal-hydraulics. Functional analysis is the first element of the formal Systems Engineering Process. Systems Engineering methodology is commonly applied in both commercial and military programs, particularly where the needs of the program involve complex interrelationships between hardware, software, personnel, and support facilities. It has been extensively used in development of military systems, and in the commercial sector in the development of designs for nuclear power reactors.

Paik, I.K.; Lord, R.; Parks, B.

1992-03-27T23:59:59.000Z

271

Experimental program plan for the Waste Isolation Pilot Plant  

SciTech Connect

The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

Not Available

1994-01-01T23:59:59.000Z

272

Federal Energy Management Program: Plans, Implementation, and Results  

NLE Websites -- All DOE Office Websites (Extended Search)

Plans, Implementation, and Results Plans, Implementation, and Results The U.S. Department of Energy's Federal Energy Management Program (FEMP) works with key individuals to accomplish energy change within organizations, by bringing expertise from all levels of project and policy implementation, to enable Federal agencies to meet energy-related goals and provide energy leadership to the country. This Web page includes links to documents that support the office management process and the results and public benefits that derive from it. Overview Learn more about this EERE office. Plans Discover the plans, budgets, and analyses that set the direction of this office's priorities and activities. Implementation Find out how this office controls, implements, and adjusts its plans and manages its activities.

273

Federal Technical Capabilities Program (FTCP) 2003 Annual Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Technical Capability Program FY 2003 Annual Plan Washington, D.C. 20585 September 2002 FTCP FY 2003 Annual Action Plan INTRODUCTION The U.S. Department of Energy's Federal Technical Capability Program (FTCP) provides management direction to assist the Federal workforce in maintaining necessary technical competencies to safely operate its defense nuclear facilities. The Federal Technical Capability Panel (Panel) consists of senior technical safety managers representing nuclear facilities, and reports to the Deputy Secretary for workforce safety technical capabilities' matters. The Panel will continue to pursue progress in the following areas: 1. Continued development of senior management commitment and support for the technical intern

274

Functional Analysis and Thermal-Hydraulics Program Plan  

SciTech Connect

The purpose of this document is to set forth the Program Plan for the Functional Analysis and Thermal-Hydraulics (FA TH) Program (herein after referred to as the [open quotes]Program[close quotes]) for the 5 year period covering fiscal years 1992 thru 1996. Specifically, the actions planned by the Safety Analysis Group (SAG) of the Reactor Safety Research Section within SRTC will be identified, defined, and a schedule and resource projection presented. This document will be used by the Reactor Safety Research Section management as the baseline definition for the Program's scope, schedule and cost. Annual budget and staffing requests will be submitted based on this approved baseline. Status reporting and progress monitoring will be performed against this approved baseline. This Program plan will be revised as needed to reflect the changes that come about due to Program redirection. The Program's primary mission is to provide further assurance that the Savannah River Site K-Reactor is designed, modified, operated and maintained in a safe, cost-effective manner through application of functional analysis methodology and continued development of thermal hydraulic support capabilities. It is envisioned that the Program will continue throughout the operating life of K-Reactor and have a permanent staff of eight: one lead and seven engineers. The Program has two primary elements; (1) functional analysis, and (2) thermal-hydraulics. Functional analysis is the first element of the formal Systems Engineering Process. Systems Engineering methodology is commonly applied in both commercial and military programs, particularly where the needs of the program involve complex interrelationships between hardware, software, personnel, and support facilities. It has been extensively used in development of military systems, and in the commercial sector in the development of designs for nuclear power reactors.

Paik, I.K.; Lord, R.; Parks, B.

1992-03-27T23:59:59.000Z

275

Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1  

SciTech Connect

This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.

Schafer, D.D.

1995-09-01T23:59:59.000Z

276

Strategic plan for the restructured US fusion energy sciences program  

SciTech Connect

This plan reflects a transition to a restructured fusion program, with a change in focus from an energy technology development program to a fusion energy sciences program. Since the energy crisis of the early 1970`s, the U.S. fusion program has presented itself as a goal- oriented fusion energy development program, with milestones that required rapidly increasing budgets. The Energy Policy Act of 1992 also called for a goal-oriented development program consistent with the Department`s planning. Actual funding levels, however, have forced a premature narrowing of the program to the tokamak approach. By 1995, with no clear, immediate need driving the schedule for developing fusion energy and with enormous pressure to reduce discretionary spending, Congress cut fusion program funding for FY 1996 by one-third and called for a major restructuring of the program. Based on the recommendations of the Fusion Energy Advisory Committee (FEAC), the Department has decided to pursue a program that concentrates on world-class plasma, science, and on maintaining an involvement in fusion energy science through international collaboration. At the same time, the Japanese and Europeans, with energy situations different from ours, are continuing with their goal- oriented fusion programs. Collaboration with them provides a highly leveraged means of continued involvement in fusion energy science and technology, especially through participation in the engineering and design activities of the International Thermonuclear Experimental Reactor program, ITER. This restructured fusion energy sciences program, with its focus on fundamental fusion science and technology, may well provide insights that lead to more attractive fusion power plants, and will make use of the scientific infrastructure that will allow the United States to launch a fusion energy development program at some future date.

1996-08-01T23:59:59.000Z

277

Strategic plan for the geothermal energy program  

SciTech Connect

Geothermal energy (natural heat in the Earth`s crust) represents a truly enormous amount of energy. The heat content of domestic geothermal resources is estimated to be 70,000,000 quads, equivalent to a 750,000-year supply of energy for the entire Nation at current rates of consumption. World geothermal resources (exclusive of resources under the oceans) may be as much as 20 times larger than those of the US. While industry has focused on hydrothermal resources (those containing hot water and/or steam), the long-term future of geothermal energy lies in developing technology to enable use of the full range of geothermal resources. In the foreseeable future, heat may be extracted directly from very hot rocks or from molten rocks, if suitable technology can be developed. The US Department of Energy`s Office of Geothermal Technologies (OGT) endorses a vision of the future in which geothermal energy will be the preferred alternative to polluting energy sources. The mission of the Program is to work in partnership with US industry to establish geothermal energy as a sustainable, environmentally sound, economically competitive contributor to the US and world energy supply. In executing its mission and achieving its long-term vision for geothermal energy, the Program has identified five strategic goals: electric power generation; direct use applications and geothermal heat pumps; international geothermal development; science and technology; and future geothermal resources. This report discusses the objectives of these five goals.

1998-06-01T23:59:59.000Z

278

Coal Power Systems strategic multi-year program plans  

SciTech Connect

The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

None

2001-02-01T23:59:59.000Z

279

Configuration management program plan for Hanford site systems engineering  

SciTech Connect

This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

Hoffman, A.G.

1994-11-14T23:59:59.000Z

280

Large stationary Stirling engine. Final report. Volume II. Program plan  

SciTech Connect

A program plan for the design, fabrication and testing of two 1000 HP stationary Stirling engines was developed. The program duration is expected to be approximately 5-1/2 years, with engine site installation occurring in the beginning and mid-1986, respectively; including a substantial effort for the design/development of a heat transport system, a development and design verification testing program and a user-demonstration program for both the engines. The total program cost including fee is $22.5M, assuming that the heat source is furnished completely checked out. The overall program was structured in six major tasks which are as follows: project management, preliminary design, development testing, final design, fab and assembly, and installation and test.

1980-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Downhole replaceable drill bit: progress report and program plan  

DOE Green Energy (OSTI)

The significant progress in the development of the downhole replaceable drill bit which had been completed by the end of January 1976 is reviewed. A long-range program plan is included to indicate the level of effort required to bring this system to commercial production.

Newsom, M.M.; St. Clair, J.A.; Ashmore, R.F.; Dodd, H.M. Jr.

1976-06-01T23:59:59.000Z

282

Planning Strategic Communications and Outreach for the Solar Program  

DOE Green Energy (OSTI)

Advances made through the Solar Program in photovoltaic and solar thermal technologies must be well communicated to appropriate audiences if further technical and market growth will occur. As the Program's communications team, we developed a plan to: (1) integrate communications across the various solar technologies and reduce redundancy; (2) target audiences and messages strategically; (3) respond better to changes in markets, technology perceptions, audiences, and funding; (4) develop communication projects within the context of other relevant plans (e.g., Solar Program Multi-Year Technical Plan); (5) leverage limited resources; and (6) cultivate a multiyear mentality. Our approach included profiling eight key audiences, including their perceptions of solar technologies; formulating audience-specific messages and communication objectives and strategies; and proposing communications tactics to reinforce the objectives. Presently, we are conducting a needs assessment of print products, as well as a gap analysis. We will then prioritize projects, complete high-priority projects, measure effectiveness of selected projects and the plan, and seek strategic connections with other activities and programs.

Pedigo, S.; Nahan, R.; Moon, S.; Gwinner, D.; Brooks, C.; Butler Burt, W.

2005-01-01T23:59:59.000Z

283

Planning Strategic Communications and Outreach for the Solar Program  

SciTech Connect

Advances made through the Solar Program in photovoltaic and solar thermal technologies must be well communicated to appropriate audiences if further technical and market growth will occur. As the Program's communications team, we developed a plan to: (1) integrate communications across the various solar technologies and reduce redundancy; (2) target audiences and messages strategically; (3) respond better to changes in markets, technology perceptions, audiences, and funding; (4) develop communication projects within the context of other relevant plans (e.g., Solar Program Multi-Year Technical Plan); (5) leverage limited resources; and (6) cultivate a multiyear mentality. Our approach included profiling eight key audiences, including their perceptions of solar technologies; formulating audience-specific messages and communication objectives and strategies; and proposing communications tactics to reinforce the objectives. Presently, we are conducting a needs assessment of print products, as well as a gap analysis. We will then prioritize projects, complete high-priority projects, measure effectiveness of selected projects and the plan, and seek strategic connections with other activities and programs.

Pedigo, S.; Nahan, R.; Moon, S.; Gwinner, D.; Brooks, C.; Butler Burt, W.

2005-01-01T23:59:59.000Z

284

Quality Assurance Program Plan for radionuclide airborne emissions monitoring  

SciTech Connect

This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site.

Vance, L.M.

1993-07-01T23:59:59.000Z

285

Iraq liquid radioactive waste tanks maintenance and monitoring program plan.  

SciTech Connect

The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad (Iraq Ministry of Science and Technology)

2011-10-01T23:59:59.000Z

286

Taking out one billion tones of carbon: the magic of China's 11th Five-Year Plan  

E-Print Network (OSTI)

the Energy Conservation Center, Japan The World Bank, 2001.Energy Efficiency In Buildings. Washington DC:World Bank The

Lin, Jiang; Zhou, Nan; Levine, Mark D.; Fridley, David

2007-01-01T23:59:59.000Z

287

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network (OSTI)

the Energy Conservation Center, Japan The World Bank, 2001.Energy Efficiency In Buildings. Washington DC:World Bank The

Lin, Jiang

2008-01-01T23:59:59.000Z

288

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

heating Special fund for demonstration projects of renewable energy in buildings Subsidy for demonstration projects of solar

Levine, Mark D.

2010-01-01T23:59:59.000Z

289

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network (OSTI)

boiler boiler stove district heating heat pump conditionerSmall cogen Stove District heating Heat pump Centralized AC

Lin, Jiang

2008-01-01T23:59:59.000Z

290

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

supply efficiency of district heating is 50% more than thatloads, priority develop district heating, and then developboilers into the district heating. In 2010, popularization

Levine, Mark D.

2010-01-01T23:59:59.000Z

291

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network (OSTI)

space heating, space conditioning, water heating, lighting,broken out into space heating, air conditioning, appliances,Conditioning Appliances Cooking Lighting Other Uses Space

Lin, Jiang

2008-01-01T23:59:59.000Z

292

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network (OSTI)

Y. , 2003. China’s Sustainable Energy Future, Scenarios ofZhu,Y. , 2003. China’s Sustainable Energy Scenarios in 2020,and to move toward a sustainable energy future. Maintaining

Lin, Jiang

2008-01-01T23:59:59.000Z

293

Taking out one billion tones of carbon: the magic of China's 11th Five-Year Plan  

E-Print Network (OSTI)

Zhu,Y. , 2003. China’s Sustainable Energy Scenarios in 2020,Y. , 2003. China’s Sustainable Energy Future, Scenarios ofand to move toward a sustainable energy future. Maintaining

Lin, Jiang; Zhou, Nan; Levine, Mark D.; Fridley, David

2007-01-01T23:59:59.000Z

294

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

Use, Energy Intensity, and GDP Data (2005-2008) IndicatorThe indicators could be total energy intensity, heatingEnergy Intensity Baseline and Reported Energy Use (2005-2008) Indicator

Levine, Mark D.

2010-01-01T23:59:59.000Z

295

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

Methane recovery: o through exploitation of ground coal-bedcoal-bed gas and gas drawing from ground, waste mine and under mine, annual utilization of methane

Levine, Mark D.

2010-01-01T23:59:59.000Z

296

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

for 15% of national energy consumption, but its industrialReduce unit energy consumption to national advanced levelreduce unit energy consumption to the national advanced

Levine, Mark D.

2010-01-01T23:59:59.000Z

297

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

Document [2007] 53. Power Generation of Dispatching forefficiency of thermal power generation including the T&Ddry quenching (CDQ), power generation through blast furnace

Levine, Mark D.

2010-01-01T23:59:59.000Z

298

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network (OSTI)

Coal, oil and oil product, crude oil, other Coal, oiland oil product, crude oil, other Steam, diesel, electricityDomestic Internation al Crude oil, oil products, NG, other

Lin, Jiang

2008-01-01T23:59:59.000Z

299

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

conservation management n government office buildings and large-scale public buildingsConservation Management Work of Government Office Building and Large Scale Public Building.Conservation Projects. During the Eleventh FYP period, residential buildings and public buildings

Levine, Mark D.

2010-01-01T23:59:59.000Z

300

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

policy, environmental protection was incorporated into the system, and renewable energy units, such as wind

Levine, Mark D.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network (OSTI)

considering that energy consumption has grown more rapidlyof China’s energy consumption by major international2. Recent Trends in Energy Consumption in China Between 1980

Lin, Jiang

2008-01-01T23:59:59.000Z

302

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

2000. The Guidebook for Energy Audits, Programme Schemes andAUDIT II - Guidebook for Energy Audit Programme Developers.of the inspection or energy audit are borne by the central

Levine, Mark D.

2010-01-01T23:59:59.000Z

303

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

to the recent increase in coal prices, and together with thesuch as energy price reform (coal, electricity, gasoline,Grid Purchasing Prices from Small Coal-fired Plants. April

Levine, Mark D.

2010-01-01T23:59:59.000Z

304

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network (OSTI)

Pilot Project with the Steel Industry in Shandong Province,scenario and the iron and steel industry could achieve anand iron & steel) and other industries could provide a

Lin, Jiang

2008-01-01T23:59:59.000Z

305

Taking out one billion tones of carbon: the magic of China's 11th Five-Year Plan  

E-Print Network (OSTI)

Pilot Project with the Steel Industry in Shandong Province,intensive industries such as cement, steel, and chemicals;commodities in heavy industries (iron and steel , chemicals,

Lin, Jiang; Zhou, Nan; Levine, Mark D.; Fridley, David

2007-01-01T23:59:59.000Z

306

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

in China Iron & Steel Industry." Presentation at APP 5thAdjustment in Iron and Steel Industry, June 14, 2006.Capacity in Iron and Steel Industry. April 28, 2007. http://

Levine, Mark D.

2010-01-01T23:59:59.000Z

307

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

htm Energy Star, 2009. Dishwashers for Consumers. Availableindex.cfm? c=dishwash.pr_dishwashers Ericsson, K. , 2006certified products such as dishwashers, refrigerators and

Levine, Mark D.

2010-01-01T23:59:59.000Z

308

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

ENERGY STAR for Industry Energy Guides include both process-s sector-wide energy efficiency guides provide informationto develop energy efficiency guides, which are being

Levine, Mark D.

2010-01-01T23:59:59.000Z

309

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network (OSTI)

target to • +1% in coal fired plant efficiency • -1% in T&Dincludes increasing coal-fired power plant efficiency by 1

Lin, Jiang

2008-01-01T23:59:59.000Z

310

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

on Accelerating Small Coal-fired Plants Closures from NDRC.Prices from Small Coal-fired Plants. April 2, 2007. NationalAccelerating Small Coal- fired Plants Closures. January 20,

Levine, Mark D.

2010-01-01T23:59:59.000Z

311

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

include three tasks: building insulation, indoor heatingcompared to buildings without insulation. For existingbuilding design and construction enterprises and respective supervisory units are responsible for obtaining energy labeling certification, verification of construction completion and insulation

Levine, Mark D.

2010-01-01T23:59:59.000Z

312

A UCRL-AR-143313-12 FY13 Twenty-Five Year Site Plan UCLR-AR-143313...  

National Nuclear Security Administration (NNSA)

Framework PRIME Product Realization Infrastructure for Materials and Engineering R&D research and development RTBF Readiness in Technical Base and Facilities SA Supplement...

313

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

and lighting), ground source heat pumps, sea water or wastea target of using ground source heat pumps in 650 million m

Levine, Mark D.

2010-01-01T23:59:59.000Z

314

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

with Cai Zhihua, Energy Saving Department, Department ofthe Thousand Enterprise Energy Saving Action Implementationof Architectural Energy-Saving in China. ”http://

Levine, Mark D.

2010-01-01T23:59:59.000Z

315

Assessment of China's Energy-Saving and Emission-Reduction Accomplishments and Opportunities During the 11th Five Year Plan  

E-Print Network (OSTI)

the level defined for a passive house in Germany (see FigureMinerge Germany Standard Passive House Definition Figure 15.low energy buildings or passive houses. Passive housing is

Levine, Mark D.

2010-01-01T23:59:59.000Z

316

Taking out 1 billion tons of CO2: The magic of China's 11th Five-Year Plan?  

E-Print Network (OSTI)

Intercity Trucks Coal, oil, coke, other Freight water localmetal min prod petroleum, coke, & nuke smelting & rolling ofElectricity heat Coal and coke Coal Electr icity heat

Lin, Jiang

2008-01-01T23:59:59.000Z

317

2007 Federal Technical Capabilities Program (FTCP) Corrective Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7,2007 7,2007 The Honorable A. J. Eggenberger Chairman, Defense Nuclear Facilities Safety Board 625 Indiana Avenue NW, Suite 700 Washington, D.C. 20004-290 1 Dear Mr. Chairman: Enclosed is Federal Technical Capability Program (FTCP) Corrective Action Plan, Revision 1, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, Revision 2, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004- 1. This plan has been updated to identify the completed and remaining Department corrective actions to improve recruiting, developing, training, qualifying, maintaining proficiency of, and retaining technical personnel to safely accomplish DOE'S mission. The plan is approved and issued for implementation, effective

318

UMTRA technical assistance contractor quality assurance program plan  

SciTech Connect

This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

Not Available

1994-10-01T23:59:59.000Z

319

Operating plan for the Office of International Health Programs  

Science Conference Proceedings (OSTI)

In this report unified ideas are presented about what the Office of International Health Programs does, what the individual contributions are, and how the organization connects to the Department of Energy. The planning efforts have focused on the office`s three areas of responsibility: Europe, Japan, and the Marshall Islands. Common to each technical program area are issues related to the following: health of populations exposed to radiation incidents and the associated medical aspects of exposure; dose reconstruction; training; and public involvement. Each of the program areas, its customers, and primary customer interests are described.

NONE

1996-01-01T23:59:59.000Z

320

Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan  

Science Conference Proceedings (OSTI)

The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

Early, T.O.

1994-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Low-temperature thermal energy storage program annual operating plan  

DOE Green Energy (OSTI)

The LTTES program operating plans for FY 1978 are described in terms of general program objectives and the technical activities being implemented to achieve these objectives. The program structure provides emphasis on several principal thrusts; namely, seasonal thermal storage, daily/short-term thermal storage, and waste heat recovery and reuse. A work breakdown structure (WBS) organizes the efforts being carried out in-house or through subcontract within each thrust area. Fiscal data are summarized in respect to thrust area, individual efforts, and funding source.

Hoffman, H. W.; Eissenberg, D. M.

1979-01-01T23:59:59.000Z

322

Oak Ridge National Laboratory institutional plan, FY 1996--FY 2001  

SciTech Connect

This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years. Included in the report are: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory strategic plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; resource projections; appendix which contains data for site and facilities, user facility, science and mathematic education and human resources; and laboratory organization chart.

1995-12-01T23:59:59.000Z

323

Twenty-five years of artificial photosynthesis research at Ernest Orlando Lawrence Berkeley National Laboratory  

DOE Green Energy (OSTI)

This report summarizes the research done on artificial photosynthesis by the Calvin Group between 1970 and 1995 when the program was terminated. It contains a compilation of the personnel involved as well as a bibliography of publications supported by the project.

Otvos, J.W.; Calvin, M.

1996-02-01T23:59:59.000Z

324

KU School of Allied Health Five-year Goals Consistent with the 10-year KUMC Vision  

E-Print Network (OSTI)

& Vascular Technology Diagnostic Cardiac Sonography Nuclear Medicine Technology KU School of Allied Health-listed for clinical doctoral programs (initiated through Occupational Therapy Education). 3. Recruit entry incorporation as separate entity for clinical services and billing. Expanded services at Silver City Health

Albertini, David

325

Report to Congress: Comprehensive Program Plan for Advanced Turbine Systems  

DOE Green Energy (OSTI)

Consistent with the Department of Energy (DOE) mission, the Advanced Turbine Systems (ATS) Program will develop more efficient gas turbine systems for both utility and industrial electric power generation (including cogeneration). The Program will develop base-load power systems for commercial offering in the year 2000. Although the target fuel is natural gas, the ATS will be adaptable to coal and biomass firing. All ATS will exhibit these characteristics: Ultra-high efficiency [utility systems: 60 percent (lower heating value basis); industrial systems: 15 percent improvement over today`s best gas turbine systems]; Environmental superiority [reduced nitrogen oxides (NO{sub x}), carbon dioxide (CO{sub 2}), carbon monoxide (CO), and unburned hydrocarbons (UHC)]; and Cost competitiveness [10 percent lower cost of electricity]. This Program Plan was requested in the House, Senate, and Conference Reports on the FY 1993 Interior and Related Agencies Appropriations Act, Public Law 102--381, and is consistent with the Energy Policy Act of 1992, which (in Section 2112) identifies work for improving gas turbines. This plan outlines the 8-year ATS Program and discusses rationale and planning. Total Program costs are estimated to be $700 million, consisting of an approximate $450 million government share and an approximate $250 million cost-share by industrial participants.

Not Available

1993-07-01T23:59:59.000Z

326

Utility Battery Storage Systems Program plan: FY 1994--FY 1998  

SciTech Connect

The Utility Battery Storage Systems Program, sponsored by the US Department of Energy (DOE), is addressing needed improvements so that the full benefits of these systems can be realized. A key element of the Program is the quantification of the benefits of batteries used in utility applications. The analyses of the applications and benefits are ongoing, but preliminary results indicate that the widespread introduction of battery storage by utilities could benefit the US economy by more than $26 billion by 2010 and create thousands of new jobs. Other critical elements of the DOE Program focus on improving the batteries, power electronics, and control subsystems and reducing their costs. These subsystems are then integrated and the systems undergo field evaluation. Finally, the most important element of the Program is the communication of the capabilities and benefits of battery systems to utility companies. Justifiably conservative, utilities must have proven, reliable equipment that is economical before they can adopt new technologies. While several utilities are leading the industry by demonstrating battery systems, a key task of the DOE program is to inform the entire industry of the value, characteristics, and availability of utility battery systems so that knowledgeable decisions can be made regarding future investments. This program plan for the DOE Utility Battery Storage Systems Program describes the technical and programmatic activities needed to bring about the widespread use of batteries by utilities. By following this plan, the DOE anticipates that many of the significant national benefits from battery storage will be achieved in the near future.

Not Available

1994-02-01T23:59:59.000Z

327

Environmental development plan for transportation programs: FY80 update  

DOE Green Energy (OSTI)

This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

1980-09-01T23:59:59.000Z

328

Budget FY 1996 Site Support Program Plan: WBS 6.10.1. Revision 1  

Science Conference Proceedings (OSTI)

This is the budget site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance baseline schedule, cost baseline by month, and the program funding required.

Wemhoff, G.M.

1995-09-01T23:59:59.000Z

329

Multiyear Program Plan for the High Temperature Materials Laboratory  

DOE Green Energy (OSTI)

Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.

Arvid E. Pasto

2000-03-17T23:59:59.000Z

330

Hospital laundry standards and energy conservation: a program plan  

SciTech Connect

A program plan describing required research and experimental plans for establishing a proposed revision of hospital laundry standards is presented. An extension of the literature search done by Hittman and Associates was done to see whether the quality of the finished laundry could be maintained under revised standards. Consideration was given to stain removal, whiteness, and sanitation. An extensive review of published literature on standards is included. There is room for energy conservation measures in the hospital laundry, but it is noted that energy conservation measures must be accompanied by care and practicality in their implementation.

Battles, D.R.; Vesley, D.; Banks, R.S.

1980-01-01T23:59:59.000Z

331

Planned Closeout of the Cf-252 Loan/Lease Program  

SciTech Connect

New funding is sought to pursue planned closeout of the Cf-252 Loan Program. The work will be performed in phases. In the initial phase, users will be surveyed to determine whether they wish to take ownership of sources in their possession, or return them. In the second phase, sources will be recalled from non-DOE entities, and source ownership transfers will be performed. In the third phase, the remaining sources from DOE entities will be recalled. Initial funding of $350K is sought to fund the first phase, and to plan execution of the remaining phases given information collected from user surveys.

Sherman, Steven R [ORNL; Patton, Bradley D [ORNL

2012-09-01T23:59:59.000Z

332

Geothermal-subsidence research program plan and review  

DOE Green Energy (OSTI)

The revised Geothermal Subsidence Research Plan (GSRP) presented here is the result of two years of research based on the recommendations of a technical advisory committee and on the DOE/DGE's wish to include specific components applicable to the geopressure resources on the Gulf Coast. This revised plan describes events leading up to FY 1979 and 1980 and the resulting research activities completed for that period. At the time of this writing most of the projects are completed; this document summarizes the accomplishments of the GSRP during FY 1979 and 1980 and includes recommendations for the FY 1981 and 1982 programs.

Goldstein, N.E.; Noble, J.E.; Simkin, T.L.

1980-09-01T23:59:59.000Z

333

DOE-owned spent nuclear fuel program plan  

SciTech Connect

The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines.

1995-11-01T23:59:59.000Z

334

Five-year summary and evaluation of operations and performance of the Utica aquifer and North Lake Basin Wetlands restoration project in 2004-2009.  

SciTech Connect

This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.

LaFreniere, L. M. (Environmental Science Division)

2011-09-13T23:59:59.000Z

335

Savannah River Site Environmental Implementation Plan  

SciTech Connect

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

336

Savannah River Site environmental implementation plan  

SciTech Connect

Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

337

2009 Federal Technical Capabilities Program (FTCP) Corrective Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

O. Box 5400 O. Box 5400 Albuquerque, NM 87185 The Honorable A.I. Eggenberger Chairman, Defense Nuclear Facilities Safety Board 625 Indiana Avenue NW, Suite 700 Washington D.C. 20004-2901 Dear Mr. Chairman: MAR 1 9 2009 Enclosed is the Federal Technical Capabilities Program (FTCP) Corrective Action Plan, Revision 2, which is Deliverable B for Commitment 13 in the Department of Energy (DOE) Implementation Plan to Improve Oversight of Nuclear Operations, issued in response to Defense Nuclear Facilities Safety Board Recommendation 2004-1. This plan has been updated to identify that all Department corrective actions to improve recruiting, developing, training, qualifying, maintaining proficiency of, and retaining technical personnel to safely accomplish DOE's mission have been completed. This revised

338

EM-21 Multi-Year Program Plan Prioritization Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 24, 2008 July 24, 2008 EM-21 Multi-Year Program Plan Prioritization Process A presentation to the Department of Energy High Level Waste Corporate Board 2 Topics to be Covered ¡ Initiative Development Team approach and structure ¡ Goals ¡ Background on prioritization process ¡ Lessons Learned from FY 2008 ¡ Prioritization Process l Overview l Criteria l Task Development and Selection l Current status l Process output ¡ Program Management 3 Waste Processing Programs Initiative Development Team Structure Waste Processing Programs (WBS 1.0) Steve Krahn (EM-21) Texas Chee (EM-21) Lead - Jeff Griffin (SRNL) Deputy - Paul Bredt (PNNL) Jay Roach (INL) Ben Lewis (ORNL) Blue - EM-20 Green - SRNL Red - INL Purple - PNNL Brown - ORNL Black - Other Affiliated Institutions Legend: Personnel: Improved Waste Storage

339

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect

U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

Washington TRU Solutions

2002-09-24T23:59:59.000Z

340

Self-assessment program implementation plan. Revision A  

Science Conference Proceedings (OSTI)

This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

Quets, A.L.

1991-10-23T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Hanford Waste Vitrification Plant Project Waste Form Qualification Program Plan  

SciTech Connect

The US Department of Energy has created a waste acceptance process to help guide the overall program for the disposal of high-level nuclear waste in a federal repository. This Waste Form Qualification Program Plan describes the hierarchy of strategies used by the Hanford Waste Vitrification Plant Project to satisfy the waste form qualification obligations of that waste acceptance process. A description of the functional relationship of the participants contributing to completing this objective is provided. The major activities, products, providers, and associated scheduling for implementing the strategies also are presented.

Randklev, E.H.

1993-06-01T23:59:59.000Z

342

Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.  

DOE Green Energy (OSTI)

The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

1987-10-01T23:59:59.000Z

343

Solid-State Lighting: 2005 DOE Solid-State Lighting Program Planning...  

NLE Websites -- All DOE Office Websites (Extended Search)

2005 DOE Solid-State Lighting Program Planning Workshop Materials to someone by E-mail Share Solid-State Lighting: 2005 DOE Solid-State Lighting Program Planning Workshop Materials...

344

Report of the Integrated Program Planning Activity for the DOE Fusion Energy Sciences Program  

SciTech Connect

This report of the Integrated Program Planning Activity (IPPA) has been prepared in response to a recommendation by the Secretary of Energy Advisory Board that, ''Given the complex nature of the fusion effort, an integrated program planning process is an absolute necessity.'' We, therefore, undertook this activity in order to integrate the various elements of the program, to improve communication and performance accountability across the program, and to show the inter-connectedness and inter-dependency of the diverse parts of the national fusion energy sciences program. This report is based on the September 1999 Fusion Energy Sciences Advisory Committee's (FESAC) report ''Priorities and Balance within the Fusion Energy Sciences Program''. In its December 5,2000, letter to the Director of the Office of Science, the FESAC has reaffirmed the validity of the September 1999 report and stated that the IPPA presents a framework and process to guide the achievement of the 5-year goals listed in the 1999 report. The National Research Council's (NRC) Fusion Assessment Committee draft final report ''An Assessment of the Department of Energy's Office of Fusion Energy Sciences Program'', reviewing the quality of the science in the program, was made available after the IPPA report had been completed. The IPPA report is, nevertheless, consistent with the recommendations in the NRC report. In addition to program goals and the related 5-year, 10-year, and 15-year objectives, this report elaborates on the scientific issues associated with each of these objectives. The report also makes clear the relationships among the various program elements, and cites these relationships as the reason why integrated program planning is essential. In particular, while focusing on the science conducted by the program, the report addresses the important balances between the science and energy goals of the program, between the MFE and IFE approaches, and between the domestic and international aspects of the program. The report also outlines a process for establishing a database for the fusion research program that will indicate how each research element fits into the overall program. This database will also include near-term milestones associated with each research element, and will facilitate assessments of the balance within the program at different levels. The Office of Fusion Energy Sciences plans to begin assembling and using the database in the Spring of 2001 as we receive proposals from our laboratories and begin to prepare our budget proposal for Fiscal Year 2003.

None

2000-12-01T23:59:59.000Z

345

1972-1997, Twenty-five years of energy and environmental history : lessons learned.  

SciTech Connect

Given the events of the past 25 years concerning energy and environmental issues and our reaction to them, what lessons can we learn? First, the individual American consumer wants and expects energy to be a stable commodity with low prices and easy availability. As evidenced by the heated debate over increasing the federal gasoline tax by $.05 per gallon (which would still leave Americans paying only one-third of what Europeans pay for gasoline), increases in energy prices elicit very strong public and political opposition. As further evidence, it has been argued that the general public support of the Gulf War was due, in part, to a recognition of the need to maintain a stable source of cheap oil from the region. The American public wants to maintain the benefits of cheap and abundant energy and expects its political leaders to make it happen. A second lesson is that if constraints on the energy supply do occur (e.g., the OPEC-imposed oil embargo) ardor environmental impacts from energy use do appear to be significant (e.g., SO{sub 2} and CO{sub 2} emissions), the preference is for a technology fix rather than a behavioral change. This is evidenced by our reliance on moving low-sulfur coal more than 1,000 miles from Wyoming to burn in Illinois power plants rather than reducing the demand for electricity with energy-efficient measures in residential, commercial, and industrial activities. National research programs to produce an automobile that gets 80+ miles per gallon take higher priority over working to get people to use mass transit to reduce their driving mileage. Americans expect that advanced technology can be relied upon to come up with solutions to energy and environmental problems without having to change their lifestyles. The experience with natural gas, in which a regulatory change (deregulation) was combined with technology developments (horizontal drilling and improved gas turbines for electricity generation) to increase available supply and hold prices down, has added to the confidence in the efficacy of technology fixes to solve energy and environmental problems. Third, it is difficult for government to tamper with energy markets and achieve the desired results.The energy system has shown itself to be a complex adaptive system that adjusts to even the most strenuous burdens in ways that are not easy to predict. Governmental attempts to predict and then prescribe the development of the future energy system are bound to meet with limited, if any, success. Rather, the more appropriate goal seems to be development of a robust and flexible energy system that can evolve and adjust to changing conditions. Given the experiences of the past and the lessons learned from these experiences, what might the future bring? Some predictions can be made with considerable confidence. It is highly likely that the trend of deregulating the energy sector will continue, with electricity deregulation a virtual certainty. It is also highly probable that the demand and consumption of energy from developing countries will soon surpass those of the US, Europe, and Japan, thus making them serious competitors for limited fossil fuel resources. In the environmental arena, some form of emission control of greenhouse gases from the energy sector will be agreed upon soon by the international community. More stringent regulations in the US for the emissions of some air and water pollutants are also likely. Preservation of biological diversity will also likely continue to be an issue of increasing importance.

Drucker, H.

1997-12-17T23:59:59.000Z

346

Coal Power Systems strategic multi-year program plans  

SciTech Connect

The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

2001-02-01T23:59:59.000Z

347

Program plan for molten carbonate fuel-cell systems development  

DOE Green Energy (OSTI)

The purpose of this document is to describe in both programmatic and technical terms the methodology that the US Department of Energy will use to commercialize a molten carbonate fuel cell power plant. Responsibility for the planning and management of the program resides in the molten carbonate fuel cell program office at the Argonne National Laboratory which reports to the Assistant Director for Fuel Cells in the Division of Fossil Fuel utilization of DOE/FE. The actual development of technology is carried out by selected contractors. The technology development phase of the program will culminate with the construction and operation of two demonstration power plants. The first power plant will be an industrial cogeneration plant which will be completed in 1987. The other power plant will be a baseload electric power plant to be completed in 1989.

Not Available

1978-10-27T23:59:59.000Z

348

Atmospheric Radiation Measurement Program Science Plan Current Status and Future Directions of the ARM Science Program  

SciTech Connect

The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative transfer, aerosol science, determination of cloud properties, cloud modeling, and cloud parameterization testing and development. The focus of ARM science has naturally shifted during the last few years to an increasing emphasis on modeling and parameterization studies to take advantage of the long time series of data now available. During the next 5 years, the principal focus of the ARM science program will be to: • Maintain the data record at the fixed ARM sites for at least the next five years. • Improve significantly our understanding of and ability to parameterize the 3-D cloud-radiation problem at scales from the local atmospheric column to the global climate model (GCM) grid square. • Continue developing techniques to retrieve the properties of all clouds, with a special focus on ice clouds and mixed-phase clouds. • Develop a focused research effort on the indirect aerosol problem that spans observations, physical models, and climate model parameterizations. • Implement and evaluate an operational methodology to calculate broad-band heating rates in the atmospheric columns at the ARM sites. • Develop and implement methodologies to use ARM data more effectively to test atmospheric models, both at the cloud-resolving model scale and the GCM scale. • Use these methodologies to diagnose cloud parameterization performance and then refine these parameterizations to improve the accuracy of climate model simulations. In addition, the ARM Program is actively developing a new ARM Mobile Facility (AMF) that will be available for short deployments (several months to a year or more) in climatically important regions. The AMF will have much of the same instrumentation as the remote facilities at ARM’s Tropical Western Pacific and the North Slope of Alaska sites. Over time, this new facility will extend ARM science to a much broader range of conditions for model testing.

TP Ackerman; AD Del Genio; RG Ellingson; RA Ferrare; SA Klein; GM McFarquhar; PJ Lamb; CN Long; J Verlinde

2004-10-30T23:59:59.000Z

349

National program plan for electric vehicle battery research and development  

SciTech Connect

EVs offer the prospect of reducing US petroleum fuel usage and air pollution in major metropolitan areas. In 1987, DOE-EHP commissioned a two-phase study at INEL to produce a national plan for R D on battery technology -- the limiting component in EVs. The battery assessment phase identified the most-promising'' technologies from a comprehensive list of viable EV batteries. This multi-year R D program plan identifies development schedules, milestones, and tasks directed at resolving the critical technical and economic issues for the most-promising developmental batteries: bipolar lead/acid, flow-through lead/acid, iron/air, lithium/iron sulfide, nickel/iron, sodium/metal chloride, sodium/sulfur, zinc/air, and zinc/bromine. 8 refs., 1 fig., 6 tabs.

Henriksen, G.L.; Douglas, D.L.; Warde, C.J. (EG and G Idaho, Inc., Idaho Falls, ID (USA); Douglas (David L.), Inc., Bloomington, MN (USA); Warde Associates, Inc., Greensboro, NC (USA))

1989-08-01T23:59:59.000Z

350

National Program Plan Fuel Cells in Transportation. Executive Summary  

DOE Green Energy (OSTI)

Fuel cells are being developed for application in the transportation sector because they will convert hydrogen to electric power at high efficiencies with virtually no detrimental environmental impact. To realize these energy, environmental, and economic benefits, developers of FCVs need to (1) reduce the size and weight of current designs, (2) develop fuel cell propulsion systems with rapid start-up and greater load-following capability, (3) reduce system cost and/or improve performance, and (4) utilize alternative fuels to a large extent. This Plan addresses the FCV-related requirements of the Energy Act, describing a development program for light- and heavy-duty propulsion systems, a basic R&D program on fuel cell technology that is separate from, but feeds into, the system development activities, and supporting analyses. Implementation of the Program Plan by means of industry/government alliances will accelerate the commercialization of FCVs. In the long term, the successful deployment of large numbers of FCVs promises to eliminate the transportation sector as a major contributor to the nation`s environmental problems.

Not Available

1993-02-01T23:59:59.000Z

351

Risk communications and the Chemical Stockpile Emergency-Planning Program  

Science Conference Proceedings (OSTI)

The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

Vogt, B.M.; Sorensen, J.H.

1994-09-01T23:59:59.000Z

352

DOE National SCADA Test Bed Program Multi-Year Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National SCADA Test Bed Program Multi-Year Plan National SCADA Test Bed Program Multi-Year Plan DOE National SCADA Test Bed Program Multi-Year Plan This document presents the National SCADA Test Bed Program Multi-Year Plan, a coherent strategy for improving the cyber security of control systems in the energy sector. The NSTB Program is conducted within DOE's Office of Electricity Delivery and Energy Reliability (OE), which leads national efforts to modernize the electric grid, enhance the security and reliability of the energy infrastructure, and facilitate recovery from disruptions to the energy supply. The Plan covers the planning period of fiscal year 2008 to 2013. DOE National SCADA Test Bed Program Multi-Year Plan More Documents & Publications DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan

353

HTGR Spent Fuel Treatment Program. HTGR Spent Fuel Treatment Development Program Plan  

SciTech Connect

The spent fuel treatment (SFT) program plan addresses spent fuel volume reduction, packaging, storage, transportation, fuel recovery, and disposal to meet the needs of the HTGR Lead Plant and follow-on plants. In the near term, fuel refabrication will be addressed by following developments in fresh fuel fabrication and will be developed in the long term as decisions on the alternatives dictate. The formulation of this revised program plan considered the implications of the Nuclear Waste Policy Act of 1982 (NWPA) which, for the first time, established a definitive national policy for management and disposal of nuclear wastes. Although the primary intent of the program is to address technical issues, the divergence between commercial and government interests, which arises as a result of certain provisions of the NWPA, must be addressed in the economic assessment of technically feasible alternative paths in the management of spent HTGR fuel and waste. This new SFT program plan also incorporates a significant cooperative research and development program between the United States and the Federal Republic of Germany. The major objective of this international program is to reduce costs by avoiding duplicate efforts.

1984-12-01T23:59:59.000Z

354

Y-12 Site environmental protection program implementation plan (EPPIP)  

SciTech Connect

The Y-12 Plant Environmental Protection Program is conducted to: (1) protect public health and the environment from chemical and radiological releases occurring from current plant operations and past waste management and operational practices; (2) ensure compliance with federal, state, and local environmental regulations and DOE directives; (3) identify potential environmental problems; (4) evaluate existing environmental contamination and determine the need for remedial actions and mitigative measures; (5) monitor the progress of ongoing remedial actions and cleanup measures; and (6) inform the public of environmental issues relating to DOE operations. DOE Order 5400.1, General Environmental Protection Program, defines the general requirements for environmental protection programs at DOE facilities. This Environmental Protection Program Implementation Plan (EPPIP) defines the methods by which the Y-12 Plant staff will comply with the order by: (1) referencing environmental protection goals and objectives and identifying strategies and timetables for attaining them; (2) providing the overall framework for the design and implementation of the Y-12 Environmental Protection Program; and (3) assigning responsibilities for complying with the requirements of the order. The EPPIP is revised and updated annually.

1996-11-01T23:59:59.000Z

355

Natural Gas Strategic Plan and Multi-Year Program Crosscut Plan, FY 1994--1999  

SciTech Connect

DOE has established a Natural Gas Coordinating Committee to ensure that all natural gas programs are conducted with a single strategic focus and without unnecessary duplication. This group prepared the FY 1993 update of the DOE Natural Gas Strategic Plan and Multi-Year Crosscut Program Plan (FY 1993-1998), which was first produced a year ago as a ``working draft`` for industry comment. This revised version incorporates these external comments and the results and recommendations of such developments as Order No. 636 of the Federal Energy Regulatory Commission (FERC), the FERC/DOE Natural Gas Deliverability Task Force Report; the National Petroleum Council`s 1992 natural gas study, The Potential for Natural Gas in the United States; relevant provisions of the EPACT, and new policy guidance from the Clinton Administration. The overall goal of the Natural Gas RD&D Program is to improve the Nation`s ability to supply, store, transport, distribute, and utilize gas in an economically efficient and environmentally beneficial manner. In support of DOE`s missions are programs that will: improve the confidence in the continued availability of a long-term gas supply (Resource and Extraction Area); provide more cost-effective and competitive means to use natural gas in both new and existing markets (Utilization Area); develop improved and less costly means of delivering and storing gas (Delivery and Storage Area); and develop and ensure availability of low cost environmental compliance technology, and reduce regulatory barriers to efficient market operations by promoting coordinated, efficient, and innovative Federal and State regulations (Environmental/Regulatory Impact Area). Each program area has its own unique mission that contributes to the goals and mission of the overall Natural Gas Program.

1993-12-01T23:59:59.000Z

356

Microsoft Word - MAaD_Pathway_Program_Plan_2012_Final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORNL/LTR-2012/327 ORNL/LTR-2012/327 Revision 0 Light Water Reactor Sustainability Program Materials Aging and Degradation Technical Program Plan September 2012 U.S. Department of Energy Office of Nuclear Energy DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness, of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. References herein to any specific commercial product, process, or service by trade name, trade mark, manufacturer, or otherwise,

357

Fuel cell systems program plan, Fiscal year 1993  

DOE Green Energy (OSTI)

DOE Office of Fossil Energy (OoFE) is participating with private sector in developing molten carbon fuel cell (MCFC) and advanced concepts including solid oxide fuel cell for application in utility/commercial/industrial sectors. Phosphoric acid fuel cell (PAFC) development was sponsored by OoFE and is now being commercialized. In 1993 DOD is undertaking use and demonstration of PAFC and other fuel cells. DOE Office of Conservation and Renewable Energy is sponsoring fuel cell development for propulsion. The Conservation program is focused on polymer electrolyte or proton exchange membrane fuel cells, although they also are implementing a demonstration program for PAFC buses. DOE fuel cell research, development and demonstration efforts are also supported by private sector funding. This Plan describes the fuel cell activities of the Office of Fossil Energy.

Not Available

1993-07-01T23:59:59.000Z

358

Next Generation Nuclear Plant Methods Technical Program Plan  

Science Conference Proceedings (OSTI)

One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

2010-12-01T23:59:59.000Z

359

Next Generation Nuclear Plant Methods Technical Program Plan -- PLN-2498  

Science Conference Proceedings (OSTI)

One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

2010-09-01T23:59:59.000Z

360

Next Generation Nuclear Plant Methods Technical Program Plan  

Science Conference Proceedings (OSTI)

One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

High-level waste management technology program plan  

Science Conference Proceedings (OSTI)

The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs.

Harmon, H.D.

1995-01-01T23:59:59.000Z

362

5-Year Research Plan on Fine Particulate Matter in the Atmosphere  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Technology Laboratory Five Year Research Plan on Fine Particulate Matter in the Atmosphere FY2001-FY2005 NETL PM Research Program Ambient Sampling & Analysis Control Technology R&D Source Characterization Predictive Modeling -iii- TABLE OF CONTENTS Page I. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 A. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 B. Outlook for PM and the Environment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 II. OVERVIEW OF THE PROGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 A. Program Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 B. Current Program Highlights . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 1. The Upper Ohio River Valley Project (UORVP) . . . . . . . . . . . . . . . . . . 13

363

TRUPACT-II Hydrogen G-Valve Program Test Plan  

DOE Green Energy (OSTI)

This test plan describes the objectives, scope, participants, and components of the Transuranic Package Transporter-II (TRUPACT-II) Hydrogen G-Value Program (GH2P). The GH2P builds on the experience, results, and experimental setup of the TRUPACT-II Matrix Depletion Program (MDP) to establish effective hydrogen G-values (G-values) for additional waste matrices. This plan details the experimental design and test matrices for experiments to measure the G-value for additional waste matrices, including first- and second-stage sludges at the Idaho National Engineering and Environmental Laboratory, and molten salt extraction residues with varying amounts of residual moisture (i.e., unbound water). Data collected from the GH2P will be used to support an application to the US Nuclear Regulatory Commission for G-values and corresponding wattage limits for the TRUPACT-II payloads containing these waste matrices. The testing will also evaluate the ability to determine G-values on a waste stream basis.

Mroz, Eugene J.

1999-01-01T23:59:59.000Z

364

WORLD TRADE CENTER INDOOR DUST TEST AND CLEAN PROGRAM PLAN  

E-Print Network (OSTI)

Background: This Test and Clean Program plan is the result of ongoing efforts to monitor the current environmental conditions for residents and workers impacted by the collapse of the World Trade Center (WTC) towers. In March 2004, EPA convened an expert technical review panel to provide individual guidance and assistance to the Agency in its use of available exposure and health surveillance databases and registries to characterize any remaining exposures and risks, identify unmet public health needs, and to individually recommend steps to further minimize the risks associated with the aftermath of the WTC attack. The WTC Expert Technical Review Panel (WTC Panel) members met periodically in open meetings to interact with EPA and the public about plans to monitor for the presence of WTC dust in indoor environments and to individually suggest additional measures that could be undertaken by EPA and others to evaluate the dispersion of the plume and the geographic extent of environmental impact from the collapse of the WTC towers. The WTC Panel members were charged, in part, with reviewing data from post-cleaning verification sampling to be done by EPA in the residential areas included in EPA Region 2's 2002-3 Indoor Air Residential Assistance Program to verify that recontamination has not

unknown authors

2005-01-01T23:59:59.000Z

365

LOWER MANHATTAN INDOOR DUST TEST AND CLEAN PROGRAM PLAN  

E-Print Network (OSTI)

Background: This Test and Clean Program plan is the result of ongoing efforts to respond to concerns of residents and workers impacted by the collapse of the World Trade Center (WTC) towers. In March 2004, EPA convened an expert technical review panel to provide individual guidance and assistance to the Agency in its use of available exposure and health surveillance databases and registries to characterize any remaining exposures and risks, identify unmet public health needs, and individually recommend steps to further minimize the risks associated with the aftermath of the WTC attack. The WTC Expert Technical Review Panel (WTC Panel) members met periodically in open meetings to interact with EPA and the public about plans to monitor for the presence of WTC dust in indoor environments and to individually suggest additional measures that could be undertaken by EPA and others to evaluate the dispersion of the plume and the geographic extent of environmental impact from the collapse of the WTC towers. The WTC Panel members were charged, in part, with reviewing data from post-cleaning verification sampling to be done by EPA in the residential areas included in EPA Region 2's 2002-2003 Indoor Air Residential Assistance Program to verify that recontamination has not

unknown authors

2006-01-01T23:59:59.000Z

366

Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases  

Science Conference Proceedings (OSTI)

The Performance Demonstration Program (PDP) for headspace gases distributes blind audit samples in a gas matrix for analysis of volatile organic compounds (VOCs). Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement facilities must analyze PDP samples using the same procedures used for routine waste characterization analyses of WIPP samples.

Carlsbad Field Office

2007-11-13T23:59:59.000Z

367

Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases  

SciTech Connect

The Performance Demonstration Program (PDP) for headspace gases distributes sample gases of volatile organic compounds (VOCs) for analysis. Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement facilities must analyze PDP samples using the same procedures used for routine waste characterization analyses of WIPP samples.

Carlsbad Field Office

2006-04-01T23:59:59.000Z

368

Performance Demonstration Program Plan for Analysis of Simulated Headspace Gases  

SciTech Connect

The Performance Demonstration Program (PDP) for headspace gases distributes blind audit samples in a gas matrix for analysis of volatile organic compounds (VOCs). Participating measurement facilities (i.e., fixed laboratories, mobile analysis systems, and on-line analytical systems) are located across the United States. Each sample distribution is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD) (DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department (NMED). The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the Headspace Gas (HSG) PDP. Participating measurement facilities analyze blind audit samples of simulated TRU waste package headspace gases according to the criteria set by this PDP Plan. Blind audit samples (hereafter referred to as PDP samples) are used as an independent means to assess each measurement facility’s compliance with the WAP quality assurance objectives (QAOs). To the extent possible, the concentrations of VOC analytes in the PDP samples encompass the range of concentrations anticipated in actual TRU waste package headspace gas samples. Analyses of headspace gases are required by the WIPP to demonstrate compliance with regulatory requirements. These analyses must be performed by measurement facilities that have demonstrated acceptable performance in this PDP. These analyses are referred to as WIPP analyses and the TRU waste package headspace gas samples on which they are performed are referred to as WIPP samples in this document. Participating measurement facilities must analyze PDP samples using the same procedures used for routine waste characterization analyses of WIPP samples.

Carlsbad Field Office

2007-11-19T23:59:59.000Z

369

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

370

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

1993-03-15T23:59:59.000Z

371

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

1993-03-15T23:59:59.000Z

372

Twenty-Five Years of Ecological Recovery of East Fork Poplar Creek: Review of Environmental Problems and Remedial Actions  

SciTech Connect

In May 1985, a National Pollutant Discharge Elimination System permit was issued for the Department of Energy s Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee, USA, allowing discharge of effluents to East Fork Poplar Creek (EFPC). The effluents ranged from large volumes of chlorinated oncethrough cooling water and cooling tower blow-down to smaller discharges of treated and untreated process wastewaters, which contained a mixture of heavy metals, organics, and nutrients, especially nitrates. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to meet two major objectives: demonstrate that the established effluent limitations were protecting the classified uses of EFPC, and document the ecological effects resulting from implementing a Water Pollution Control Program at the Y-12 Complex. The second objective is the primary focus of the other papers in this special series. This paper provides a history of pollution and the remedial actions that were implemented; describes the geographic setting of the study area; and characterizes the physicochemical attributes of the sampling sites, including changes in stream flow and temperature that occurred during implementation of the BMAP. Most of the actions taken under the Water Pollution Control Program were completed between 1986 and 1998, with as many as four years elapsing between some of the most significant actions. The Water Pollution Control Program included constructing nine new wastewater treatment facilities and implementation of several other pollution-reducing measures, such as a best management practices plan; area-source pollution control management; and various spill-prevention projects. Many of the major actions had readily discernable effects on the chemical and physical conditions of EFPC. As controls on effluents entering the stream were implemented, pollutant concentrations generally declined and, at least initially, the volume of water discharged from the Y-12 Complex declined. This reduction in discharge was of ecological concern and led to implementation of a flow management program for EFPC. Implementing flow management, in turn, led to substantial changes in chemical and physical conditions of the stream: stream discharge nearly doubled and stream temperatures decreased, becoming more similar to those in reference streams. While water quality clearly improved, meeting water quality standards alone does not guarantee protection of a waterbody s biological integrity. Results from studies on the ecological changes stemming from pollution-reduction actions, such as those presented in this series, also are needed to understand how best to restore or protect biological integrity and enhance ecological recovery in stream ecosystems. With a better knowledge of the ecological consequences of their decisions, environmental managers can better evaluate alternative actions and more accurately predict their effects.

Smith, John G [ORNL; Loar, James M [ORNL; Stewart, Arthur J [ORNL

2011-01-01T23:59:59.000Z

373

National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006  

SciTech Connect

The U.S. Department of Energy's (DOE's) Weatherization Assistance Program was created by Congress in 1976 under Title IV of the Energy Conservation and Production Act. The purpose and scope of the Program as currently stated in the Code of Federal Regulations (CFR) 10CFR 440.1 is 'to increase the energy efficiency of dwellings owned or occupied by low-income persons, reduce their total residential expenditures, and improve their health and safety, especially low-income persons who are particularly vulnerable such as the elderly, persons with disabilities, families with children, high residential energy users, and households with high energy burden' (Code of Federal Regulations, 2005). DOE sponsored a comprehensive evaluation of the Program in the early 1990's to provide policy makers and program implementers with up-to-date and reliable information they needed for effective decision making and cost-effective operations. Oak Ridge National Laboratory (ORNL) managed the five part study which was based primarily on data from Program Year (PY) 1989 and supplemented by data from 1991-92 (Brown, Berry, and Kinney, 1994). In more recent years, ORNL has conducted four metaevaluations of the Program's energy savings using studies conducted by individual states between the years 1990-1996 (Berry, 1997), 1996-1998 (Schweitzer and Berry, 1999), 1993-2002 (Berry and Schweitzer, 2003), and 1993-2005 (Schweitzer, 2005). DOE announced through its Weatherization Program Notice 05-1 (DOE, 2004) that it would undertake a new national evaluation of the Program because the Program that was evaluated comprehensively in the early 1990's is vastly different from the Program of today. The Program has incorporated new funding sources, management principles, audit procedures, and energy-efficiency measures in response to findings and recommendations resulting from the 1989 National Evaluation, the Weatherization Plus strategic planning process, and other federal, state, and local initiatives. For example, the use of computerized audits has increased, cooling and baseload measures have been added, weatherization approaches tailored to the unique construction characteristics of mobile homes have been developed, the weatherization of large multifamily buildings has expanded and become more sophisticated, the flexibility to improve 'energy-related' health and safety has been provided, and leveraging with utilities, other state programs, and owners of large multifamily buildings has increased considerably. The Department of Energy tasked ORNL with planning the new evaluation in light of its experience in conducting the previous national evaluation and the metaevaluations. This preliminary evaluation plan, developed by ORNL, documents how the new national evaluation will be performed. In the remaining portion of this section, the purpose and fundamental questions the evaluation will address are identified and how these questions were derived is discussed.

Ternes, Mark P [ORNL; Schweitzer, Martin [ORNL; Tonn, Bruce Edward [ORNL; Schmoyer, Richard L [ORNL; Eisenberg, Joel Fred [ORNL

2007-02-01T23:59:59.000Z

374

Savannah River Site environmental implementation plan. Volume 1, Executive summary  

SciTech Connect

Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

375

Coal and Power Systems Strategic Plan and Multi-Year Program...  

NLE Websites -- All DOE Office Websites (Extended Search)

NETL People Search Go to US DOE Publications - Brochures Coal and Power Systems Strategic Plan and Multi-Year Program Plan Issued The Office of Fossil Energy Coal and Power...

376

Research and Development Planning: Program 57 Siting, Vegetation Management, and Avian Issues  

Science Conference Proceedings (OSTI)

This report documents the outcome of two planning sessions conducted in 2006 and 2007 to support research and development planning for Program 57Rights of Way: Siting, Vegetation Management, and Avian Issues.

2007-06-18T23:59:59.000Z

377

UMTRA technical assistance contractor Quality Assurance Program Plan. Revision 4  

SciTech Connect

This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation.

Pehrson, P.

1993-10-12T23:59:59.000Z

378

Quality Assurance Program Plan (QAPP) Waste Management Project  

SciTech Connect

This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

VOLKMAN, D.D.

1999-10-27T23:59:59.000Z

379

Quality Assurance Program Plan for TRUPACT-II Gas Generation Test Program  

Science Conference Proceedings (OSTI)

The Gas Generation Test Program (GGTP), referred to as the Program, is designed to establish the concentration of flammable gases and/or gas generation rates in a test category waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II). The phrase "gas generationtesting" shall refer to any activity that establishes the flammable gas concentration or the flammable gas generation rate. This includes, but is not limited to, measurements performed directly on waste containers or during tests performed on waste containers. This Quality Assurance Program Plan (QAPP) documents the quality assurance (QA) and quality control (QC) requirements that apply to the Program. The TRUPACT-II requirements and technical bases for allowable flammable gas concentration and gas generation rates are described in the TRUPACT-II Authorized Methods for Payload Control (TRAMPAC).

Carlsbad Field Office

2002-03-01T23:59:59.000Z

380

Transportation Emergency Preparedness Program Plan, U.S. Department of Energy Region 6  

Science Conference Proceedings (OSTI)

The United States Department of Energy (DOE) Region 6 Transportation Emergency Preparedness Program Plan (TEPP Plan) operates within the framework of the DOE emergency management system for developing, coordinating, and directing emergency planning, preparedness, and readiness assurance activities for radiological transportation incidents. The DOE Region 6 TEPP Plan is a narrative description of the DOE Transportation Emergency Preparedness Program activities, training and technical assistance provided to states and tribes along DOE's transportation corridors in DOE Region 6.

Marsha Keister

2010-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Next Generation Nuclear Plant Research and Development Program Plan  

DOE Green Energy (OSTI)

The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: (1) Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission (2) Demonstrate safe and economical nuclear-assisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: (1) High temperature gas reactor fuels behavior; (2) High temperature materials qualification; (3) Design methods development and validation; (4) Hydrogen production technologies; and (5) Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen production [DOE 2004] and energy conversion technologies programs are described elsewhere.

None

2005-01-01T23:59:59.000Z

382

Next Generation Nuclear Plant Research and Development Program Plan  

DOE Green Energy (OSTI)

The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission Demonstrate safe and economical nuclearassisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: High temperature gas reactor fuels behavior High temperature materials qualification Design methods development and validation Hydrogen production technologies Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen production [DOE 2004] and energy conversion technologies programs are described elsewhere.

P. E. MacDonald

2005-01-01T23:59:59.000Z

383

Strategic plan strategy of the Oak Ridge National Laboratory Environmental Restoration Program  

SciTech Connect

This report provides information about the use of an integrated strategic plan, strategy, and life-cycle baseline in the long range planning and risk process employed by the environmental restoration program at the Oak Ridge National Laboratory (ORNL). Long-range planning is essential because the ER Program encompasses hundreds of sites; will last several decades; and requires complex technology, management, and policy. Long-range planning allows a focused, cost-effective approach to identify and meet Program objectives. This is accomplished through a strategic plan, a strategy, and a life-cycle baseline. This long-range methodology is illustrated below.

1995-06-01T23:59:59.000Z

384

Building system integration research: recommendations for a US Department of Energy multiyear program plan  

SciTech Connect

This plan describes the scope, technical content, and resources required to conduct the Building System Integration (BSI) research program during FY 1987 through 1991. System integration research is defined, the need for the research is discussed, its benefits are outlined, and the history of building system integration research is summarized. The program scope, the general approach taken in developing this program plan, and the plan's contents are also described.

1986-01-01T23:59:59.000Z

385

Better Buildings Neighborhood Program: Step 3: Develop Plans...  

NLE Websites -- All DOE Office Websites (Extended Search)

Financing Workforce Development Step 3: Develop Plans of Action Process Mapping for Problem Solving Austin Energy's detailed planning process was critical to the successful...

386

Microsoft Word - FE_Hydrogen_Program_Plan_2003_External_FINAL...  

NLE Websites -- All DOE Office Websites (Extended Search)

OFFICE OF FOSSIL ENERGY - HYDROGEN PROGRAM PLAN HYDROGEN COORDINATION GROUP JUNE 2003 Hydrogen from Natural Gas and Coal: The Road to a Sustainable Energy Future HYDROGEN FROM...

387

Hydrogen, Fuel Cells and Infrastructure Technologies Program: Multiyear Research, Development and Demonstration Plan  

DOE Green Energy (OSTI)

This plan includes goals, objectives, technical targets, tasks, and schedules for Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen Program.

Milliken, J.

2007-10-01T23:59:59.000Z

388

Hydrogen, Fuel Cells and Infrastructure Technologies Program: Multiyear Research, Development and Demonstration Plan  

SciTech Connect

This plan includes goals, objectives, technical targets, tasks, and schedules for Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen Program.

Milliken, J.

2007-10-01T23:59:59.000Z

389

Performance demonstration program plan for analysis of simulated headspace gases  

DOE Green Energy (OSTI)

The Performance Demonstration Program (PDP) for analysis of headspace gases will consist of regular distribution and analyses of test standards to evaluate the capability for analyzing VOCs, hydrogen, and methane in the headspace of transuranic (TRU) waste throughout the Department of Energy (DOE) complex. Each distribution is termed a PDP cycle. These evaluation cycles will provide an objective measure of the reliability of measurements performed for TRU waste characterization. Laboratory performance will be demonstrated by the successful analysis of blind audit samples of simulated TRU waste drum headspace gases according to the criteria set within the text of this Program Plan. Blind audit samples (hereinafter referred to as PDP samples) will be used as an independent means to assess laboratory performance regarding compliance with the QAPP QAOs. The concentration of analytes in the PDP samples will encompass the range of concentrations anticipated in actual waste characterization gas samples. Analyses which are required by the WIPP to demonstrate compliance with various regulatory requirements and which are included in the PDP must be performed by laboratories which have demonstrated acceptable performance in the PDP.

NONE

1995-06-01T23:59:59.000Z

390

Special initiatives FY 1996 multi-year program plan (MYPP) WBS 5.0. Revision 1  

DOE Green Energy (OSTI)

The Special Initiatives mission supports programmatic requests for service to DOE offices, other organizations and agencies. These requests can include the following: Supporting priority DOE initiatives, researching special programs, studying locating new activities ar the Hanford Site, producing specialty materials, providing consulting support to other sites, and managing a broad spectrum of US and international test programs. The Special Initiatives Program discussed in this plan consists of the following elements: space power programs, advanced programs, special programs, and program strategy.

Howald, S.C.

1995-09-01T23:59:59.000Z

391

Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program  

Science Conference Proceedings (OSTI)

This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program`s management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention.

Not Available

1994-07-01T23:59:59.000Z

392

N Reactor Standby Program plan, Part 2: Transition to standby; Revision 1  

Science Conference Proceedings (OSTI)

The N Reactor Standby Program is the Westinghouse Hanford Company (WHC) program to prepare the N Reactor for cold standby in a cost effective and quality manner with a primary emphasis on safety. The N Reactor Standby Program is comprised of five parts or sub-programs, of which the Transition to Standby Program is part two. Transition to Standby is that part of the overall program that encompasses the on-going operational and maintenance activities required to maintain safe control of the reactor and support facilities until their layup is complete. The Transition to Standby Program Plan has been developed to outline the program plans, baselines, and controls to be employed in the management of the Transition to Standby Program. This plan also defines the roles and responsibilities of the major program participants.

NONE

1989-12-01T23:59:59.000Z

393

Landlord Program multi-year program plan fiscal year 1995 WBS 7.5  

Science Conference Proceedings (OSTI)

The Landlord Program mission is to maintain, preserve, or upgrade the strategic assets of the Hanford Site to meet the overall cleanup mission. This encompasses innovative, appropriate, and cost effective general purpose infrastructure support, services, and long range strategic site planning that is the foundation for seven major Hanford programs. These programs are (1) Environmental Restoration, (2) Tank Waste Remediation System, (3) Solid/Liquid Waste Decontamination, (4) Facility Transition, (5) Spent Fuel, (6) Technology Development, and (7) the Multi-Program Laboratory. General infrastructure support consists of facilities, systems, and equipment that by design or use are not essentially dedicated to a single program mission. Facilities include laboratories, shops, warehouses, and general work space. Systems include electrical, process sewers, rail, roads, telecommunications, water, fire and emergency response, and steam supply and distribution. Funding also supports capital equipment critical to maintaining, upgrading, or operating the general infrastructure. Paramount to these objectives is compliance with all applicable laws, orders, agreements, codes, standards, best management and safety practices. The objectives for general infrastructure support are reflected in five programmatic functions, (1) Program Integration, (2) Capital Equipment, (3) Expense Funded Projects, (4) General Plant Projects, and (5) Line Items.

Young, C.L.

1994-09-26T23:59:59.000Z

394

Property:NumberOfLowCarbonPlanningProgramsAgriculture | Open Energy  

Open Energy Info (EERE)

NumberOfLowCarbonPlanningProgramsAgriculture NumberOfLowCarbonPlanningProgramsAgriculture Jump to: navigation, search Property Name NumberOfLowCarbonPlanningProgramsAgriculture Property Type Number Description Number of Low Emissions development planning(ProgramTopics) and Agriculture(Sector) programs for a country Pages using the property "NumberOfLowCarbonPlanningProgramsAgriculture" Showing 25 pages using this property. (previous 25) (next 25) A Afghanistan + 0 + Albania + 0 + Algeria + 0 + Andorra + 0 + Angola + 1 + Anguilla + 0 + Antigua and Barbuda + 0 + Argentina + 3 + Armenia + 1 + Aruba + 0 + Australia + 0 + Austria + 0 + Azerbaijan + 0 + B Bahamas + 0 + Bahrain + 0 + Bangladesh + 3 + Barbados + 0 + Belarus + 0 + Belgium + 0 + Belize + 0 + Benin + 0 + Bermuda + 0 + Bhutan + 1 +

395

Next Generation Nuclear Plant Materials Research and Development Program Plan  

SciTech Connect

The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R&D Program includes the following elements: (1) Developing a specific approach, program plan and other project management tools for managing the R&D program elements; (2) Developing a specific work package for the R&D activities to be performed during each government fiscal year; (3) Reporting the status and progress of the work based on committed deliverables and milestones; (4) Developing collaboration in areas of materials R&D of benefit to the NGNP with countries that are a part of the Generation IV International Forum; and (5) Ensuring that the R&D work performed in support of the materials program is in conformance with established Quality Assurance and procurement requirements. The objective of the NGNP Materials R&D Program is to provide the essential materials R&D needed to support the design and licensing of the reactor and balance of plant, excluding the hydrogen plant. The materials R&D program is being initiated prior to the design effort to ensure that materials R&D activities are initiated early enough to support the design process and support the Project Integrator. The thermal, environmental, and service life conditions of the NGNP will make selection and qualification of some high-temperature materials a significant challenge; thus, new materials and approaches may be required.

G.O. Hayner; R.L. Bratton; R.N. Wright

2005-09-01T23:59:59.000Z

396

FTCP FY09 Operational Plan GOAL 2 White Paper - Mentoring Programs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Page 1 of 3 Page 1 of 3 FTCP White Paper Regarding Mentoring Programs Available To Technical Qualification Program Employees in DOE and NNSA Introduction: The FTCP FY2009 Operational Plan Goal 2 (Preserve and Enhance Technical Credibility) calls for "Establishing an Effective Mid-Level Recruitment Program", and to "Establish an effective mentoring program" to ensure critical knowledge transfer in designated Technical Qualification positions affecting defense nuclear facilities. The Operational Plan Team researched existing programs within the Department and determined that DOE has been successfully managing a mentoring program and NNSA piloted and is in the process of establishing a formal mentoring program. The Team recommended and the FTCP agreed to use

397

A fuzzy mixed integer goal programming approach for cooking and heating energy planning in rural India  

Science Conference Proceedings (OSTI)

In this study, a fuzzy mixed integer goal programming model (FMIGP) has been developed for rural cooking and heating energy planning in the Chikhli taluka of Buldhana district, Maharashtra, Central India. The model considers various scenarios such as ... Keywords: Energy planning, Fuzzy goal programming, Fuzzy sets

A. M. Jinturkar; S. S. Deshmukh

2011-09-01T23:59:59.000Z

398

FY13 Affirmative Action Program Plan for Disabled Veterans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Strategic Plan: http: humancapital.doe.govresourcesDOE-Human-Capital-Strategic-Plan-20 ll- 2015.pdf. F. Section 307 of the Civil Service Reform Act of 1978. G....

399

Waste Isolation Pilot Plant Groundwater Protection Management Program Plan  

SciTech Connect

The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR §264.90 through §264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] §6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

Washington Regulatory and Environmental Services

2005-07-01T23:59:59.000Z

400

Property:NumberOfLowCarbonPlanningPrograms | Open Energy Information  

Open Energy Info (EERE)

NumberOfLowCarbonPlanningPrograms NumberOfLowCarbonPlanningPrograms Jump to: navigation, search Property Name NumberOfLowCarbonPlanningPrograms Property Type Number Pages using the property "NumberOfLowCarbonPlanningPrograms" Showing 25 pages using this property. (previous 25) (next 25) A Afghanistan + 0 + Albania + 1 + Algeria + 1 + Andorra + 0 + Angola + 1 + Anguilla + 0 + Antigua and Barbuda + 2 + Argentina + 6 + Armenia + 2 + Aruba + 0 + Australia + 0 + Austria + 0 + Azerbaijan + 1 + B Bahamas + 2 + Bahrain + 0 + Bangladesh + 8 + Barbados + 3 + Belarus + 0 + Belgium + 0 + Belize + 3 + Benin + 0 + Bermuda + 0 + Bhutan + 1 + Bolivia + 2 + Bosnia and Herzegovina + 0 + (previous 25) (next 25) Retrieved from "http://en.openei.org/w/index.php?title=Property:NumberOfLowCarbonPlanningPrograms&oldid=59092

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002  

Science Conference Proceedings (OSTI)

The Decontamination and Decommissioning (D D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D D contractors are required to prepare formal plans that document the S M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D D Program.

Ford, M.K.; Holder, L. Jr.

1992-07-01T23:59:59.000Z

402

Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines  

DOE Green Energy (OSTI)

This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE`s ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

Not Available

1992-08-01T23:59:59.000Z

403

Materials Development Program, Ceramic Technology Project addendum to program plan: Cost effective ceramics for heat engines  

DOE Green Energy (OSTI)

This is a new thrust in the Ceramic Technology project. This effort represents an expansion of the program and an extension through FY 1997. Moderate temperature applications in conventional automobile and truck engines will be included along with high-temp. gas turbine and low heat rejection diesel engines. The reliability goals are expected to be met on schedule by end of FY 1993. Ceramic turbine rotors have been run (in DOE's ATTAP program) for 1000 h at 1370C and full speed. However, the cost of ceramic components is a deterrrent to near-term commercialization. A systematic approach to reducing this cost includes the following elements: economic cost modeling, ceramic machining, powder synthesis, alternative forming and densification processes, yield improvement, system design studies, standards development, and testing and data base development. A draft funding plan is outlined. 6 figs, 1 tab.

Not Available

1992-08-01T23:59:59.000Z

404

Multiyear Program Plan: Reducing Friction and Wear in Heavy Vehicles  

DOE Green Energy (OSTI)

As described in its multiyear program plan for 1998-2000, the Office of Heavy Vehicle Technologies (OHVT) envisions the development of a fuel-flexible, energy-efficient, near-zero-emissions, heavy-duty U.S. diesel engine technology devolving into all truck classes as a real and viable strategy for reducing energy requirements for commercial transport services and the rapidly growing multipurpose vehicle market (pickups, vans, and sport utility vehicles). Implementation of the OHVT program plan will have significant national benefits in energy savings, cleaner air, more jobs, and increased gross domestic product (GDP). Successful implementation will reduce the petroleum consumption of Class 1-8 trucks by 1.4 million barrels of oil per day by 2020 and over 1.8 million by 2030, amounting to a reduction in highway petroleum consumption of 13.2% and 18.6%, respectively. All types of regulated emissions will be reduced, that is, 20% drop in PM10 emissions (41,000 metric tons per year) by 203 0, 17% reduction in CO2 greenhouse gases (205 million metric tons per year), 7% reduction in NOx, 20% reduction in NMHC, and 30% reduction in CO. An increase of 15,000 jobs by 2020 is expected, as is an increase of $24 billion in GDP. The strategy of OHVT is to focus primarily on the diesel engine since it has numerous advantages. It has the highest efficiency of any engine today, 45% versus 30% for production gasoline engines; and it can be made more efficient at least to 55% and possibly up to 63%. It is the engine of choice for heavy vehicles (trucks), because it offers power, efficiency, durability, and reliability and is used extensively in rail, marine, and off-road applications. Its emission can be ultra-low to near zero, and the production infrastructure is already in place. The primary goals of OHVT are as follows: (1) Develop by 2002 the diesel-engine enabling technologies to support large-scale industry dieselization of light trucks, achieving a 35% fuel efficiency improvement over equivalent gasoline-fueled trucks. (2) Develop by 2004 the enabling technology for a Class 7-8 truck with a fuel efficiency of 10 mpg (at 65 mph) that will meet prevailing emission standards, using either diesel or a liquid alternative fuel. (3) Develop by 2006 diesel engines with fuel flexibility and a thermal efficiency of 55% with liquid alternative fuels, and a thermal efficiency of 55% with dedicated gaseous fuels. (4) Develop a methodology for analyzing and evaluating the operation of a heavy vehicle as an integrated system, considering such factors as engine efficiency; emissions; rolling resistance; aerodynamic drag; friction, wear, and lubrication effects; auxiliary power units; material substitutions for reducing weight; and other sources of parasitic energy losses. Overarching these considerations is the need to preserve system functionality, cost, competitiveness, reliability, durability, and safety.

R.R. Fessler; G.R. Fenske

1999-12-13T23:59:59.000Z

405

CYBER SECURITY AWARENESS & TRAINING Program Plan of Activity...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Publications IM-31, Policy, Guidance, and Planning Division Course Catalogue Cyber Tips Book Mark (2009 NCSA Month) Protect Your Family Brochure (Training and Awareness Materail)...

406

Augmented Fish Health Monitoring for Washington Department of Wildlife; Five-year Project Report, 1986-1991 Final Report.  

DOE Green Energy (OSTI)

The Augmented Fish Health Monitoring Project was funded by the Bonneville Power Administration (BPA) with the mandate to collect fish health data on the anadromous fish stocks of the Columbia River Basin in a standardized manner. The Washington Department of Wildlife began the project in 1986. Cumulative data and a final summary for this project are presented in this document. Fish stocks were examined monthly for length, weight, and health status at all Washington Department of Wildlife Columbia River Basin hatcheries. Assays for specific fish pathogens were conducted on all stocks of broodfish and smolts in the study area. Pathogens of interest were replicating viral agents, erythrocytic inclusion body syndrome virus (EIBSV), and Renibacterium salmoninarum. Sea-run cutthroat (SCT) were also sampled midway through the rearing cycle for R. salmoninarum. Juvenile fish were examined for the presence of any pathogen. Assays for Myxobolus cerebralis were conducted on fish stocks in several locations along the Columbia River. An organosomatic index analysis was made on each stock of smolts at the Cowlitz and Wells hatcheries. Results of the organosomatic index analysis were consistent between the years at each facility. However, the fish reared at Cowlitz displayed tissue changes associated with ceratomyxosis while those reared at Wells had a more desirable color and quality. Cell culture assays for viral agents in broodfish were positive for infectious hematopoeitic necrosis virus (IHNV) in all stocks at the Cowlitz Hatchery four out of five years in the study. Other stations were less consistent over the years. Only the sea-run cutthroat stock spawned at Beaver Creek was negative for any virus. Infectious pancreatic necrosis virus (IPNV) was isolated from summer-run steelhead (SS) broodfish at Wells in 1989 and 1991 and at Yakima in 1991. Inclusions that are characteristic of EIBSV were found in red blood cells of brood fish from the Wells Hatchery in 1990 and 1991. Data collected on EIBSV during the first two years of the project cannot be compared with the later three years due to changes in laboratory protocol. Isolations of IHNV in smolts were made from Cowlitz and Skamania hatcheries and the Gobar Rearing Pond. Epizootics of IHN occurred at Lyons Ferry, Beaver Creek, Cowlitz and Skamania hatcheries during the project, EIBSV inclusions were identified in very low levels from smolts from Beaver Creek, Chelan, Cowlitz, Eastbank, and Ringold. Assays for R. salmoninarum on broodfish and smolts revealed very low levels of infection and the disease was not a problem. Enteric redmouth disease was not observed in the project area. Cytophaga psychrophila was a chronic problem in young fish at Vancouver, Beaver Creek and Cowlitz hatcheries. Ceratomyxa Shasta was the only reportable parasite observed in the fish within the study area and caused yearly outbreaks of ceratomyxosis at the Cowlitz Hatchery. Fish at the Beaver Creek Hatchery were treated for furunculosis three of the five years of the project. An ozone water treatment plant has been installed to minimize the disease. Flow and density indexes and feed conversion did not vary significantly at the hatcheries during this project. Egg mortality averaged 12.94% throughout the project with a range from 4.39% to 29.10%. The mean fry mortality during the project was 15.08% with a range of 2.01 to 37.43%. The overall mortality for early rearing was 20.43%. Prespawning broodstock mortality was recorded for SS and SCT and averaged 5.18% with a range from 0 to 38.8%. Fungal invasion was the primary cause of death in adult fish. Epizootics of furunculosis, ceratomyxosis, bacterial coldwater disease, and IHN occurred during the project. Fewer cases were reported in more recent years. The BPA augmented fish health project helped WDW identify problem areas in fish health while they were occurring. This knowledge allowed us to develop strategies for improved fish quality. Overall the project has been invaluable in assisting us in the improvement of the health of our fish.

Kerwin, John; Roberts, Steve; Oman, Leni; Bolding, Bruce

1992-04-01T23:59:59.000Z

407

Liquid effluents program FY 1997 multi-year work plan  

Science Conference Proceedings (OSTI)

This document provides the technical baseline and work breakdown structure for the liquid effluents program.

Green, F.T.

1996-09-30T23:59:59.000Z

408

IFE Chamber Technology Testing Program In NIF and Chamber Development Test Plan Mohamed A. Abdou  

E-Print Network (OSTI)

IFE Chamber Technology Testing Program In NIF and Chamber Development Test Plan Mohamed A. Abdou chamber technology testing program in NIF involoving: criteria for evaluation prior to NIF testing were addressed in this paper. In order to maximize the benefits of testing program

Abdou, Mohamed

409

Performance Demonstration Program Plan for Nondestructive Assay for the TRU Waste Characterization Program. Revision 1  

Science Conference Proceedings (OSTI)

The Performance Demonstration Program (PDP) for Nondestructive Assay (NDA) consists of a series of tests conducted on a regular frequency to evaluate the capability for nondestructive assay of transuranic (TRU) waste throughout the Department of Energy (DOE) complex. Each test is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed with TRU waste characterization systems. Measurement facility performance will be demonstrated by the successful analysis of blind audit samples according to the criteria set by this Program Plan. Intercomparison between measurement groups of the DOE complex will be achieved by comparing the results of measurements on similar or identical blind samples reported by the different measurement facilities. Blind audit samples (hereinafter referred to as PDP samples) will be used as an independent means to assess the performance of measurement groups regarding compliance with established Quality Assurance Objectives (QAOs). As defined for this program, a PDP sample consists of a 55-gallon matrix drum emplaced with radioactive standards and fabricated matrix inserts. These PDP sample components, once manufactured, will be secured and stored at each participating measurement facility designated and authorized by Carlsbad Area Office (CAO) under secure conditions to protect them from loss, tampering, or accidental damage.

None

1997-05-01T23:59:59.000Z

410

Y-12 Plant Decontamination and Decommissioning Program. Surveillance and Maintenance Plan, FY 1992--2000  

Science Conference Proceedings (OSTI)

The Decontamination and Decommissioning (D and D) Program at the Oak Ridge Y-12 Plant is part of the Environmental Restoration (ER) and Waste Management (WM) Programs (ERWM). The objective of the ER Program is to provide Y-12 the capability to meet applicable environmental regulations through facility development activities and site remedial actions. The WM Program supports the ER program. The D and D Program provides collective management of sites within the Plant which are in need of decontamination and decommissioning efforts, prioritizes those areas in terms of health, safety, and environmental concerns, and implements the appropriate level of remedial action. The D and D Program provides support to identifiable facilities which formerly served one or more of the many Plant functions. Program activities include (1) surveillance and maintenance of facilities awaiting decommissioning; (2) planning safe and orderly facility decommissioning; and (3) implementing a program to accomplish facility disposition in a safe, cost effective, and timely manner. In order to achieve the first objective, a formal plan which documents the surveillance and maintenance needs for each facility has been prepared. This report provides this documentation for the Y-12 facilities currently included in the D and D Program, as well as those planned for future inclusion in the Program, and includes projected resource requirements for the planning period of FY 1993 through FY 2000.

Not Available

1992-01-01T23:59:59.000Z

411

Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1  

SciTech Connect

This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

NONE

1995-09-01T23:59:59.000Z

412

Wind Energy Multiyear Program Plan for 2007-2012  

DOE Green Energy (OSTI)

The purpose of this document is to provide an overview of the DOE Wind Energy Program and to describe the near and long-term goals and strategies for achieving the program's mission.

Not Available

2007-08-01T23:59:59.000Z

413

Wind Energy Multiyear Program Plan for 2007-2012  

SciTech Connect

The purpose of this document is to provide an overview of the DOE Wind Energy Program and to describe the near and long-term goals and strategies for achieving the program's mission.

2007-08-01T23:59:59.000Z

414

2012 Annual Planning Summary for Loan Program Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Loan Program Office.

415

Federal Energy Management Program: Renewable Energy Project Planning...  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning and Implementation Federal renewable energy projects can be large or small and managed by a third-party or the agency. Typically, large-scale projects-larger than 10...

416

Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1  

Science Conference Proceedings (OSTI)

This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond.

NONE

1995-09-01T23:59:59.000Z

417

National program plan for absorber surfaces R and D  

DOE Green Energy (OSTI)

The optical properties - solar absorptance (..cap alpha../sub s/) and thermal emittance (epsilon/sub t/) - of the receiver surface are important in a wide range of solar energy conversion devices from passive solar buildings to sophisticated two axis tracking concentrators. This report describes a National Plan for Absorber Surfaces R and D and includes the background information (available absorber materials and characteristics, applications, and probable benefits) used to derive the plan.

Call, P. J.

1979-01-01T23:59:59.000Z

418

Energy Planning And Management Program, Wapa Programmatic Doe/eis-0182  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1995/01eis0182_ep.html[6/27/2011 10:56:10 AM] 1995/01eis0182_ep.html[6/27/2011 10:56:10 AM] Energy Planning and Management Program Environmental Impact Statement DOE/EIS-0182 Western Area Power Administration Energy Planning and Management Program Environmental Impact Statement Energy Planning And Management Program, Wapa Programmatic Doe/eis-0182 file:///I|/Data%20Migration%20Task/EIS-0182-FEIS-1995/02eis0182_cov.html[6/27/2011 10:56:06 AM] COVER SHEET Title: Energy Planning and Management program Agency: Western Area Power Administration Contact: Mr. Robert Fullerton Western Area Power Administration

419

Planning Investments in Water Resources by Mixed-Integer Programming: The Vardar-Axios River Basin  

E-Print Network (OSTI)

A mixed integer programming model for planning water resources investments is presented. The model is a sequencing model applied to the Vardar-Axios river basin in Yugoslavia and Greece. The structure of the model is ...

Elliot, Dorothy P.

420

Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.  

DOE Green Energy (OSTI)

The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

United States. Bonneville Power Administration. Division of Fish and Wildlife.

1988-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Office of Building Technology, State and Community Programs (BTS) Strategic Plan  

SciTech Connect

This strategic plan is in direct response to the call by a broad array of interested parties, for the Office of Building Technology, State and Community Programs (BTS) to reduce fragmentation and increase focus. This plan outlines goals for saving energy, three key strategies to accomplish these goals, and a commitment to improving how they do business.

Brandegee

1999-01-28T23:59:59.000Z

422

Poster Abstract: Acxiom's Capacity On Demand Framework For the past five years Acxiom Corporation has be transitioning its IT infrastructure from a  

E-Print Network (OSTI)

Poster Abstract: Acxiom's Capacity On Demand Framework For the past five years Acxiom Corporation, distributed Grid model. Because Acxiom's internal processing needs are somewhat different from traditional Grid applications custom monitoring and control software, called the Apiary, was written in house

Melbourne, University of

423

US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities  

SciTech Connect

The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.

White, D.L. [Oak Ridge National Lab., TN (United States); Mihlmester, P.E. [Aspen Systems Corp., Oak Ridge, TN (United States)

1993-12-17T23:59:59.000Z

424

Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program  

SciTech Connect

The Performance Demonstration Program (PDP) for Nondestructive Assay (NDA) is a test program designed to yield data on measurement system capability to characterize drummed transuranic (TRU) waste generated throughout the Department of Energy (DOE) complex. The tests are conducted periodically and provide a mechanism for the independent and objective assessment of NDA system performance and capability relative to the radiological characterization objectives and criteria of the Office of Characterization and Transportation (OCT). The primary documents requiring an NDA PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC), which requires annual characterization facility participation in the PDP, and the Quality Assurance Program Document (QAPD). This NDA PDP implements the general requirements of the QAPD and applicable requirements of the WAC. Measurement facilities must demonstrate acceptable radiological characterization performance through measurement of test samples comprised of pre-specified PDP matrix drum/radioactive source configurations. Measurement facilities are required to analyze the NDA PDP drum samples using the same procedures approved and implemented for routine operational waste characterization activities. The test samples provide an independent means to assess NDA measurement system performance and compliance per criteria delineated in the NDA PDP Plan. General inter-comparison of NDA measurement system performance among DOE measurement facilities and commercial NDA services can also be evaluated using measurement results on similar NDA PDP test samples. A PDP test sample consists of a 55-gallon matrix drum containing a waste matrix type representative of a particular category of the DOE waste inventory and nuclear material standards of known radionuclide and isotopic composition typical of DOE radioactive material. The PDP sample components are made available to participating measurement facilities as designated by the Carlsbad Field Office (CBFO). The nuclear material type, mass and associated alpha activity of the NDA PDP radioactive standard sets have been specified and fabricated to allow assembly of PDP samples that simulate TRU alpha activity concentrations, radionuclidic/isotopic distributions and physical forms typical of the DOE TRU waste inventory. The PDP matrix drum waste matrix types were derived from an evaluation of information contained in the Transuranic Waste Baseline Inventory Report (TWBIR) to ensure representation of prevalent waste types and their associated matrix characteristics in NDA PDP testing. NDA drum analyses required by the Waste Isolation Pilot Plant (WIPP) may only be performed by measurement facilities that comply with the performance criteria as set forth in the NDA PDP Plan. In this document, these analyses are referred to as WIPP analyses, and the wastes on which they are performed are referred to as WIPP wastes.

Carlsbad Field Office

2005-08-03T23:59:59.000Z

425

Health and safety plan for operations performed for the Environmental Restoration Program  

SciTech Connect

This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

Trippet, W.A. II (IT Corp., (United States)); Reneau, M.; Morton, S.L. (EG and G Idaho, Inc., Idaho Falls, ID (United States))

1992-04-01T23:59:59.000Z

426

Clean coal technologies: Research, development, and demonstration program plan  

SciTech Connect

The US Department of Energy, Office of Fossil Energy, has structured an integrated program for research, development, and demonstration of clean coal technologies that will enable the nation to use its plentiful domestic coal resources while meeting environmental quality requirements. The program provides the basis for making coal a low-cost, environmentally sound energy choice for electric power generation and fuels production. These programs are briefly described.

Not Available

1993-12-01T23:59:59.000Z

427

Trillium Status & Grid3 Plans Ruth Pordes US CMS Software &...  

NLE Websites -- All DOE Office Websites (Extended Search)

where you have insufficient resources to solve yourself, like authenticationtroubleshooting * Plan for a five year project with concrete milestones - High value...

428

Strategic Planning of Communications and Knowledge Transfer for the Solar Energy Technologies Program  

SciTech Connect

The goal of the Solar Communications Team is to get the right information to the right people at the right time in the right form at the right cost, and to measure the effectiveness of projects and our strategic communications plan. Our communications efforts in FY 2005 emphasized the following: 1) Reaching the Buildings and Consumer audiences (e.g., Solar Decathlon, International Builders' Show). 2) Developing and distributing critical program documents to key stakeholders (e.g., Solar Program Review Meeting Proceedings, Industry Roadmap, second Multi-Year Program Plan). 3) Conducting a gap analysis of communications products and evaluating their effectiveness. 4) Working with our program management to streamline business processes and improve communications of management expectations. 5) Developing and maintaining content for all Solar Program Web sites that reflect research and program accomplishments. 6) Representing the interests of the Solar Program at strategic events (technical conferences, meetings, workshops, community events).

Pedigo, S.; Nahan, R.; Moon, S.; Gwinner, D.; Zuboy, J.; Brooks, C.; Wilson, T.; Hassett, R.; Burt, W. B.

2005-11-01T23:59:59.000Z

429

Selenide isotope generator for the Galileo mission. Quality assurance program plan  

DOE Green Energy (OSTI)

This Quality Program Plan has been prepared to describe the quality activities associated with the development, production, test and delivery of hardware for the Selenide Isotope Generator Program. The objective of the Quality Program Plan is to establish and maintain an effective and economical quality assurance system to assure that end items are in accordance with contractural specifications. Section I.9 of Appendix A (Statement of Work) states: The Contractor shall prepare, implement and maintain a Quality Assurance program in accordance with a DOE approved Quality Assurance Program Plan which, for purposes of this contract, the parties agree represent a modified compliance with the latest requirements of the latest NRA-1 in effect at the time of the contract issuance. NRA-1 sets forth general requirements for quality assurance programs covering a wide variety of nuclear systems and is sufficiently expansive in scope to outline the quality activities of a broad range of contractural efforts. This Quality Assurance Program Plan, including the individual Quality Directives (Quality Procedures referenced in various Quality Directives provide only historical foundations of Quality Policy and as such are not relevant to the specifics of this plan.) attached in Appendix I, defines the quality activities that are to be accomplished under the current contractural work effort. The extent to which this Plan provides activity to accomplish the major intent of each section of NRA-1 is summarized in Table 1. NRA-1 however, provides only the skeletal foundation for the plan and it should not be construed that sections or portions not explicitly quoted are implied. The Plan will function as an independent and self-supportative document.

Not Available

1978-08-01T23:59:59.000Z

430

Energy Planning - R. J. Reynolds Style  

E-Print Network (OSTI)

Though widely diversified, the various RJR companies, encompassing the Tobacco, Food and Beverages, Transportation, Energy, Institutional Service and Packaging groups, all share a common concern for effective energy management. While the structure of RJR's corporate energy program is somewhat different from that of most companies, it could well serve as a model for other similarly large, highly diversified organizations. The organization structure is such that the Manager of Energy Planning reports directly to the Corporate Vice President responsible for Business Planning and Development, who reports to the Vice Chairman of the Board. Each year RJR operating companies complete a five-year Energy Strategic Plan, which is compiled and developed into a Corporate Energy Strategic Plan by the Manager of Energy Planning.

Cooper, R. H., Jr.

1983-01-01T23:59:59.000Z

431

Environmental Implementation Plan  

SciTech Connect

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

1994-02-01T23:59:59.000Z

432

Quality assurance program plan for low-level waste at the WSCF Laboratory  

Science Conference Proceedings (OSTI)

The purpose of this document is to provide guidance for the implementation of the Quality Assurance Program Plan (QAPP) for the management of low-level waste at the Waste Sampling and Characterization Facility (WSCF) Laboratory Complex as required by WHC-CM-4-2, Quality Assurance Manual, which is based on Quality Assurance Program Requirements for Nuclear Facilities, NQA-1 (ASME).

Morrison, J.A.

1994-11-01T23:59:59.000Z

433

Fuel cell systems program plan, Fiscal year 1994  

DOE Green Energy (OSTI)

Goal of the fuel cell program is to increase energy efficiency and economic effectiveness through development and commercialization of fuel cell systems which operate on fossil fuels in multiple end use sectors. DOE is participating with the private sector in sponsoring development of molten carbonate fuel cells and solid oxide fuel cells for application in the utility, commercial, and industrial sectors. Commercialization of phosphoric acid fuel cells is well underway. Besides the introduction, this document is divided into: goal/objectives, program strategy, technology description, technical status, program description/implementation, coordinated fuel cell activities, and international activities.

Not Available

1994-07-01T23:59:59.000Z

434

NYC property tax exemption program : existing policies and future planning  

E-Print Network (OSTI)

New York City's tax expenditures relate to real property tax totaled $4.5 billion in fiscal year 2012. The largest expenditure relates to the "421-a" tax exemption program for new multi-family residential real estate ...

Wu, Jenny Chiani

2012-01-01T23:59:59.000Z

435

Online trajectory planning for UAVs using mixed integer linear programming  

E-Print Network (OSTI)

This thesis presents a improved path planner using mixed-integer linear programming (MILP) to solve a receding horizon optimization problem for unmanned aerial vehicles (UAV's). Using MILP, hard constraints for obstacle ...

Culligan, Kieran Forbes

2006-01-01T23:59:59.000Z

436

Texas LoanSTAR Monitoring and Analysis Program Draft Plan  

E-Print Network (OSTI)

Major objectives of the LoanSTAR Monitoring and Analysis Program (MAP) are to: verify energy and dollar savings of energy conservation retrofits in state, school and local government buildings; reduce energy costs by identifying operational and maintenance improvements at facilities receiving retrofits; improve retrofit selection in future rounds of the LoanSTAR Program; and provide a detailed data base of energy use in commercial/institutional buildings located in Texas.

Claridge, D. E.; Haberl, J. S.; Heffington, W. M.; O'Neal, D. L.; Turner, W. D.; Etheredge, R.; Glass, M.

1989-01-01T23:59:59.000Z

437

Surveillance and Maintenance Plan for the ORNL Decontamination and Decommissioning Program FY 1993--2002  

Science Conference Proceedings (OSTI)

The Decontamination and Decommissioning (D&D) Program at the Oak Ridge National Laboratory (ORNL) is part of the Department of Energy (DOE) Environmental Restoration D&D program. The purpose and objectivesof this program include: (1) surveillance and maintenance (S&M) of facilities awaiting decommissioning; (2) planning for the orderly decommissioning of these facilities; and (3) implementation of a program to accomplish facility disposition in a safe, cost-effective, and timely manner. Participating D&D contractors are required to prepare formal plans that document the S&M programs established for each site. This report has been prepared to provide this documentation for those facilities included in the ORNL D&D Program.

Ford, M.K.; Holder, L. Jr.

1992-07-01T23:59:59.000Z

438

Federal Energy Management Program: Energy Security Planning for Sustainable  

NLE Websites -- All DOE Office Websites (Extended Search)

Security Planning for Sustainable Buildings Security Planning for Sustainable Buildings For energy security, Federal facility managers have a responsibility to consider a broad array of potential threats and incident scenarios. An underlying process or methodology is essential to comprehensively and intelligently address all elements of energy security analysis. Given recent blackouts and concerns about vulnerable infrastructure, many public and private organizations are taking steps to ensure reliable power and continuity of operations in the event of future outages. Some government facilities have the capacity to survive short-term power outages, but are now evaluating whether their back-up power capabilities are sufficient to serve their most critical needs during a prolonged outage.

439

Hanford Permanent Isolation Barrier Program: Asphalt technology test plan  

SciTech Connect

The Hanford Permanent Isolation Barriers use engineered layers of natural materials to create an integrated structure with backup protective features. The objective of current designs is to develop a maintenance-free permanent barrier that isolates wastes for a minimum of 1000 years by limiting water drainage to near-zero amounts. Asphalt is being used as an impermeable water diversion layer to provide a redundant layer within the overall barrier design. Data on asphalt barrier properties in a buried environment are not available for the required 100-year time frame. The purpose of this test plan is to outline the activities planned to obtain data with which to estimate performance of the asphalt layers.

Freeman, H.D.; Romine, R.A.

1994-05-01T23:59:59.000Z

440

National rf technology research and development program plan  

Science Conference Proceedings (OSTI)

This plan was prepared by the Oak Ridge National Laboratory at the request of the Office of Fusion Energy, Division of Development and Technology, to define the technology development needs and priorities. The US rf research and development community, with a wide representation from universities, laboratories and industries, participated in many discussions, meetings and in a three-day workshop in developing the needs and priorities definition. This very active and effective involvement of the rf leaders from all of these groups was an essential feature of the activity and results in the plan representing a broad consensus from the magnetic fusion energy development community. In addition, a number of scientists from Japan and Europe participated by providing data.

Not Available

1983-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "five-year program plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Western Area Power Administration Record of Decision for the Energy Planning and Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 81 Federal Register / Vol. 60, No. 197 / Thursday, October 12, 1995 / Notices at 941 North Capitol Street, NE., Washington, DC 20426. Lois D. Cashell, Secretary. [FR Doc. 95-25230 Filed 10-11-95; 8:45 am] BILLING CODE 6717-01-M Western Area Power Administration Record of Decision for the Energy Planning and Management Program AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Department of Energy, Western Area Power Administration (Western) completed a draft and final environmental impact statement (EIS), DOE/EIS-0182, on its Energy Planning and Management Program (Program). Western is publishing this Record of Decision (ROD) to adopt the Program, which will require the preparation of integrated resource plans (IRP) by Western's long-term firm power

442

US-VISIT Identity Matching Algorithm Evaluation Program: ADIS Algorithm Evaluation Project Plan Update  

SciTech Connect

This document is an update to the 'ADIS Algorithm Evaluation Project Plan' specified in the Statement of Work for the US-VISIT Identity Matching Algorithm Evaluation Program, as deliverable II.D.1. The original plan was delivered in August 2010. This document modifies the plan to reflect modified deliverables reflecting delays in obtaining a database refresh. This document describes the revised schedule of the program deliverables. The detailed description of the processes used, the statistical analysis processes and the results of the statistical analysis will be described fully in the program deliverables. The US-VISIT Identity Matching Algorithm Evaluation Program is work performed by Lawrence Livermore National Laboratory (LLNL) under IAA HSHQVT-07-X-00002 P00004 from the Department of Homeland Security (DHS).

Grant, C W; Lenderman, J S; Gansemer, J D

2011-02-24T23:59:59.000Z

443

Compressed air energy storage (CAES) environmental control concerns and program plan  

DOE Green Energy (OSTI)

This report assesses the required environmental research and recommends a program plan to assist DOD's Environmental Control Technology Division (ECT) in performing its mission of ensuring that the procedures, processes, systems, and strategies necessary to minimize any adverse environmental impacts of compressed air energy storage (CAES) are developed in a timely manner so as not to delay implementation of the technology. To do so, CAES technology and the expected major environmental concerns of the technology are described. Second, ongoing or planned research in related programs and the applicability of results from these programs to CAES environmental research are discussed. Third, the additional research and development required to provide the necessary environmental data base and resolve concerns in CAES are outlined. Finally, a program plan to carry out this research and development effort is presented.

Beckwith, M.A.; Boehm, D.W.

1980-06-01T23:59:59.000Z

444

Dept. of Energy/Dept. of Transportation Gas Turbine Transit Bus Demonstration Program: program plan  

SciTech Connect

This document is the program plan for a cooperative project of the Urban Mass Transportation Administration (UMTA) of the Department of Transportation and the Division of Transportation Energy Conservation (TEC) of the Department of Energy to test and evaluate the use of gas-turbine engines in transit buses. UMTA is responsible for furn