1

When governments break contracts : foreign firms in emerging economies  

E-Print Network [OSTI]

Emerging economy governments commit to protect the property rights of foreign firms through a variety of contracts, from treaties to direct agreements. In an era of liberalized capital flows, these contracts are thought ...

Wellhausen, Rachel L. (Rachel Louise)

2012-01-01T23:59:59.000Z

2

Incentive Price Revision Firm Target UT-B Contracts Div Page 1 of 2  

E-Print Network [OSTI]

Incentive Price Revision ­ Firm Target UT-B Contracts Div Jan 2006 Page 1 of 2 incent-price-rev-firm-ext-utbx-jan06.doc INCENTIVE PRICE REVISION - FIRM TARGET (Jan 2006) (a) General. The supplies or services identified in the Agreement as item numbers __________ are subject to price revision in accordance

Pennycook, Steve

3

EIS-0131: Initial Northwest Power Act Power Sales Contracts  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration prepared this EIS to analyze the environmental impact of power sales and residential exchange contracts and to explore if there is a need to seek changes to these contracts.

4

New research contract links LANL and robotics firm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory | NationalJohn CyberNeutronsNew research contract links LANL and

5

Proposal for the Award of a Contract for the Supply of 13 kA, 190 V Thyristor Power Converters for the LHC  

E-Print Network [OSTI]

This document concerns the award of a contract for the supply of nine 13 kA, 190 V thyristor 2-quadrant power converters for the LHC. Following a market survey carried out among 99 firms in nineteen Member States, a call for tenders (IT-2942/SL/LHC) was sent on 25 October 2002 to seven firms in four Member States. By the closing date, CERN had received four tenders from four firms in three Member States. The Finance Committee is invited to agree to the negotiation of a contract with OCEM (IT), the lowest bidder, for the supply of nine 13 kA, 190 V thyristor power converters for a total amount of 2 006 931 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT - 80%; FR - 5%; CH - 5%; Other - 10%.

2003-01-01T23:59:59.000Z

6

Health-Insurer Bargaining Power and Firms' Incentives to Manage Earnings Francesco Bova  

E-Print Network [OSTI]

Health-Insurer Bargaining Power and Firms' Incentives to Manage Earnings Francesco Bova Rotman is not perfectly competitive (Dafny 2010). Motivated by this finding and the economic importance of health-insurance premiums, this is the first study to examine firms' earnings-management incentives in the face of insurance

Tipple, Brett

7

Proposal for the award of a blanket contract for the supply of encapsulated-winding dry-type power transformers  

E-Print Network [OSTI]

This document concerns the award of a blanket contract for the supply of encapsulated-winding dry-type power transformers. Following a market survey carried out among 75 firms in seventeen Member States, a call for tenders (IT-2745/ST) was sent on 5 May 2000 to eight firms in four Member States. By the closing date, CERN had received tenders from six firms in four Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with TESAR (IT), the lowest bidder, for the supply of encapsulated-winding dry-type power transformers for a total amount of 6 150 000 000 Italian lira, not subject to revision until 31 December 2002. At the exchange rate stipulated in the tender, this amount is equivalent to approximately 5 000 000 Swiss francs. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT - 78%, NO - 17% and DE - 5%.

2000-01-01T23:59:59.000Z

8

Financial constraints and firms' investment: results of a natural experiment measuring firm response to power interruption  

E-Print Network [OSTI]

size on k because of increasing returns to scale in electric power generation. Reinikka and Svensson (2002, p. 55) however note that this second-order e¤ect is small, and this assumption "seems like a reasonable ?rst approximation." 28Kaplan... ?entrepreneurial ability. This is because poor infrastructure, including power shortages, bad roads, inadequate water and sanitation, and unreliable communications is the outcome of public policies not ?rms?decisions. This study exploits these exogenous shocks to identify...

Steinbuks, J

9

Power Subscription Strategy (contracts/subscription)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006PhotovoltaicSeptember 22,ReactorAbout Power > PowerFederal Power

10

Power Subscription Announcements (contracts/subscription)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006PhotovoltaicSeptember 22,ReactorAbout Power > Power Services

11

Power Subscription Products (contracts/subscription)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006PhotovoltaicSeptember 22,ReactorAbout Power > Power

12

Intertemporal Emissions Trading and Market Power: A Dominant Firm with Competitive Fringe Model  

E-Print Network [OSTI]

1 Intertemporal Emissions Trading and Market Power: A Dominant Firm with Competitive Fringe Model Julien Chevallier1 May 26, 2009 Abstract In international emissions trading schemes such as the Kyoto Protocol and the European Union Emissions Trading Scheme, the suboptimal negotiation of the cap

Boyer, Edmond

13

Primus Power Corporation Wind Firming EnergyFarm  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket |21,-Committee Meeting425of EnergyPrimus Power

14

The inspection of power purchase contracts at the Western Area Power Administration  

SciTech Connect (OSTI)

The Office of Inspector General received an allegation regarding possible irregularities in certain power purchase contracts awarded by the Western Area Power Administration (WAPA). Based on our survey of WAPA`s power purchase procedures, we expanded our allegation based inquiry to include several management issues. Thus, the purpose of this inspection was to review the specific allegation as well as to evaluate WAPA`s power purchase contracting procedures relating to competition, the documentation of the solicitation, negotiation, and award processes, and the determination of the reasonableness of the rates negotiated by WAPA.

NONE

1995-05-01T23:59:59.000Z

15

Optimal Contract for Wind Power in Day-Ahead Electricity Markets  

E-Print Network [OSTI]

Optimal Contract for Wind Power in Day-Ahead Electricity Markets Desmond W. H. Cai1 Sachin Adlakha2 integration in current electric power systems. In this work, we study how a wind power producer can bid wind power producer will produce as much as wind power is available (up to its contract size). 1

Adlakha, Sachin

16

Contract Specifications For Olkiluoto 3 Nuclear Power Plant  

SciTech Connect (OSTI)

The Finnish Parliament ratified in May 2002 the application for a Decision-in- Principle (DIP) that was submitted by Teollisuuden Voima Oy (TVO) in November 2000 concerning the construction of a new nuclear power plant in Finland (FIN5). The bid inquiries for FIN5 were sent out by TVO in September 2002, requesting the bids by the end of March 2003. A contract with the plant supplier was signed in December 2003, implying the construction of a PWR of type EPR (European Pressurised Water Reactor) in Olkiluoto, called Olkiluoto 3 NPP. The preparation of Bid Inquiry Specifications (BIS) was initiated simultaneously with the filing of the application for DIP. The compilation of BIS was an evolutionary process, starting with the collection of relevant reference material, proceeding through the development of technical, administrative and commercial requirements, and ending with the consolidation of all documentation to a package containing the complete BIS. An intensive bid evaluation process started immediately after receiving the bids, accompanied by negotiations with the supplier candidates. The final Contract Specifications (CS) were constituted on the basis of the BIS supplemented with information contained in the bid and the outcome of the contract negotiations. (author)

Patrakka, Eero [Teollisuuden Voima Oy, 27160 Olkiluoto (Finland)

2004-07-01T23:59:59.000Z

17

Proposal for the award of a contract for the supply of four-quadrant switched-mode power converters rated at ± 120, ± 10V for the LHC  

E-Print Network [OSTI]

This document concerns the award of a contract for the supply of power converters rated at ±120A, ±10V for the LHC. Following a market survey carried out among 147 firms in nineteen Member States, a call for tenders (IT-3037/AB/LHC) was sent on 5 May 2003 to 10 firms and three consortia, each consisting of two firms, in nine Member States. By the closing date, CERN had received nine tenders from nine firms in seven Member States. The Finance Committee is invited to agree to the negotiation of a contract with EFACEC (PT), the lowest conforming bidder after realignment, for the supply of 339 four-quadrant switched-mode power modules and 110 racks for a total amount of 1 652 128 euros (2 534 894 Swiss francs), not subject to revision, with an option for the supply of additional power modules and racks, for a total amount of 142 846 euros (219 171 Swiss francs), subject to revision for inflation from 1 January 2006, bringing the total amount to a maximum of 1 794 974 euros (2 754 065 Swiss francs). The rate of ...

2003-01-01T23:59:59.000Z

18

Microsoft Word - PTPC_Contract_Demand_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

3.5 MW of firm power, BPA expects to use the federal energy surplus that BPA forecasts it will have during the remaining term of the contract. BPA identified this surplus...

19

Contract  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7-051D14517 Section J Attachment J PART III SECTION J, ATTACHMENT J SMALL BUSINESS SUBCONTRACTING PLAN FISCAL YEAR 2013 Contract No. DE-AC07-051D14517 Section J Attachment J 2...

20

EMEF DMC EFS-95-003 GDP TuRNOVER CONTINGENCY PLANNING POWER CONTRACT...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 11111111 EMEF DMC EFS-95-003 GDP TuRNOVER CONTINGENCY PLANNING POWER CONTRACT TERMINATION PROVISIONS AND CONSEQUENCES I JULY 1995 B. J. Kirby Power Systems Technology Program...

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Proposal for the award of a blanket contract for the supply of cast-resin dry-type power transformers  

E-Print Network [OSTI]

Proposal for the award of a blanket contract for the supply of cast-resin dry-type power transformers

2012-01-01T23:59:59.000Z

22

Proposal for the Award of a Contract for the Supply of 13 kA and 20.5 kA, 18 V Switched-Mode Power Converters for the LHC  

E-Print Network [OSTI]

This document concerns the award of a contract for the supply of 13 kA and 20.5 kA, 18 V switched-mode power converters using sub-converters of 3.25 kA. Following a market survey (MS-2866/SL/LHC) carried out among 81 firms in seventeen Member States and a call for tenders for prototypes (IT-2919/SL/LHC) sent on 11 June 2001, a call for tenders for the supply of the pre-series and series of 13 kA and 20.5 kA, 18 V switched-mode power converters both using sub-converters of 3.25 kA was sent to two firms on 17 September 2002. The Finance Committee is invited to agree to the negotiation of a contract with TRANSTECHNIK (DE), the only firm that has delivered a successfully qualifying prototype, for the supply of eighteen 13 kA and one 20.5 kA, 18 V switched-mode power converters and spares for a total amount of 4 607 731 euros (6 747 300 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract val...

2003-01-01T23:59:59.000Z

23

Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.  

SciTech Connect (OSTI)

This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

24

Regional Dialogue on Post-2006 Power Sales Contracts (pbl/contracts)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromising ScienceRecent SRELRecyclingProjectsRegional Dialogue Power

25

Pricing and Hedging Electricity Supply Contracts: a Case with Tolling Agreements  

E-Print Network [OSTI]

Pricing and Hedging Electricity Supply Contracts: a Case with Tolling Agreements Shi-Jie Deng Email Customized electric power contracts catering to specific business and risk management needs have gained increasing popularity among large energy firms in the restructured electricity in- dustry. A tolling

26

Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 1, Environmental Analysis.  

SciTech Connect (OSTI)

This is volume 1 of the final environmental impact statement of the Bonneville Power Administration Information is included on the following: Purpose of and need for action; alternatives including the proposed action; affected environment; and environmental consequences.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

27

Determinants of contract duration: further evidence from coal-fired power plants  

SciTech Connect (OSTI)

Transactions cost theory predicts that the availability of alternatives is one of the determinants of contract duration. Over the last 20 years, the coal market has seen many regulatory changes that have generally increased the number of alternatives in the process of procuring coal. In this paper data from long-term coal contracts for electricity generation signed before 1999 are used to estimate the effect of increasing alternatives on contract duration. Empirical results tend to match transactions cost theory that increased alternatives reduces contract duration.

Kozhevnikova, M.; Lange, I. [Queens College, Flushing, NY (United States)

2009-05-15T23:59:59.000Z

28

2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.  

SciTech Connect (OSTI)

This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

29

2007 Wholesale Power Rate Case Initial Proposal : 2007 Wholesale Power Rate Schedule and General Rate Schedule Provisions.  

SciTech Connect (OSTI)

This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

United States. Bonneville Power Administration.

2005-11-01T23:59:59.000Z

30

Office of Inspector General report on audit of the Western Area Power Administration`s contract with Basin Electric Power Cooperative  

SciTech Connect (OSTI)

At the request of the Western Area Power Administration (Western), an audit of 17 areas was conducted with respect to possible overcharges on a power contract between Western and Basin Electric Power Cooperative (Basin), Contract No. DE-MP65-82WP-19001. The contract for Western`s purchase of electric power from Basin was entered into on April 15, 1982, and was in effect from January 1, 1986, through October 31, 1990. During this 58-month period, Basin billed Western approximately $197.6 million. Overall, it was found that Basin overcharged Western approximately $23.8 million. These overcharges occurred because Basin: (1) did not recognize or amortize as gain its overestimate of completion and correction costs for Antelope Valley Station (AVS) Unit 2; (2) did not amortize the gain on the sale/leaseback of AVS Unit 2 as an offset to lease costs; (3) billed Western prematurely for lease and interest costs; (4) overcharged for the cost of coal by including administrative and general expenses and profit, as well as incorrectly calculating discounts, royalty payments, and imputed interest costs; (5) made faulty calculations of amortization rates for deferred costs; (6) used a shorter depreciation period for AVS common facilities than it had used for other power plants; (7) retained tax benefit transfers; and (8) charged Western for interest and depreciation that had been paid by others. In addition to the $23.8 million in overcharges, interest accrued on the overcharges through December 31, 1996 was estimated to be approximately $22.1 million, resulting in a total of $45.9 million due Western.

NONE

1997-06-25T23:59:59.000Z

31

Two-Settlement Electric Power Markets with Dynamic-Price Contracts  

E-Print Network [OSTI]

system conditional on contract terms, prices, outdoor temperature, and other forcing terms Assoc's: Dr. Junjie Sun (Fin. Econ, OCC, U.S. Treasury, Wash, D.C.) Dr. Hongyan Li (Consulting Eng., ABB-Serving Entities") and retail energy consumers - integration of distributed renewable energy resources, e

Tesfatsion, Leigh

32

Long-term contracts for new investments in power generation capacity : pain or gain?  

E-Print Network [OSTI]

In recent years, a debate has ensued regarding the role of long-term power purchase agreements for securing investments in power generation capacity in organized wholesale markets. This thesis illuminates the issues ...

Sakhrani, Vivek A. (Vivek Ashok)

2010-01-01T23:59:59.000Z

33

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOEEIS-0370 (cooperating agency) Western's proposed...

34

Vertical Integration and Market Power in Electricity Markets Seamus Hogan  

E-Print Network [OSTI]

the resulting wholesale market risks, which risks are further exacerbated by competition. Such contracts markets with improved wholesale market risk management, but also reduced wholesale market power. This paper develops shares in wholesale and retail markets. In general, firms whose share of generating capacity is higher

Hickman, Mark

35

BPA, Power Services, Letter announcing Port Townsend Paper Company draft contract, 2-3-2011  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScience Program CumulusA tC:\Documents 12 BONNEVILLE POWER57B O N

36

EPC Firms Expand Their Role  

E-Print Network [OSTI]

and were financed by the investor-owned electric utilities themselves. The bulk of U.S. base-load fossil, nuclear and hydro power plants were built by major firms such as Bechtel Power, Stone & Webster Enginnering Corp., Ebasco and others. Most... and thus provide the suport required by the financial institutions." HSPE has expanded its canahilities to provide facility operations services. Its past involvement with a nroject may have been two years: it is now sp.ven to eight years, consisting...

Hernandez, L. A. Jr.

37

Abstract--We formulate a three-period model for studying how the exercise of local market power by generation firms  

E-Print Network [OSTI]

by generation firms affects the equilibrium investment between the generation and the transmission sectors-efficient equilibrium of generation investments) with both those made by an integrated-resources planner (who jointly plans generation and transmission expansions) and those made by a "reactive" network planner (who plans

38

Abstract--We formulate a three-period model for studying how the exercise of local market power by generation firms  

E-Print Network [OSTI]

by generation firms affects the equilibrium investment between the generation and the transmission sectors-efficient equilibrium of generation investments) with both those made by an integrated- resources planner (who jointly plans generation and transmission expansions) and those made by a "reactive" network planner (who plans

Oren, Shmuel S.

39

Mission Support Contract Attachment J.10 Contract No. DE-AC06...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pavement Breaker, Hydra-hammer and similar; Power Broom; Spray Curing Machine (concrete); Spreader Box Mission Support Contract Attachment J.10 Contract No....

40

Machinery sharing by agribusiness firms: methodology, application, and simulation  

E-Print Network [OSTI]

entering into a joint machinery ownership contract are examined. Two, two-player models, a Nash equilibrium game theoretical model and an applied two-farm simulation model are used to determine impacts of machinery sharing on firms engaged in machinery...

Wolfley, Jared Lynn

2009-05-15T23:59:59.000Z

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

The Decline and Death of Nuclear Power  

E-Print Network [OSTI]

funding, causing nuclear power to simply fall off the energyor “ambivalent” about nuclear power to firmly against it.

Melville, Jonathan

2013-01-01T23:59:59.000Z

42

Contract Specialist  

Broader source: Energy.gov [DOE]

At the full performance level, a successful candidate in this position will serve as a Contracting Officer for procurement of goods and services and will be responsible for procuring services from...

43

Performance Contracting  

E-Print Network [OSTI]

Performance Contracting ? A Resource for Energy Efficiency Projects Schneider Electric ? Buildings Business ? CATEE 2011 2 Top Challenges for Cities & Schools Tax Revenue Reductions Property values down, sales tax revenue down, etc Energy... issues and needs postponed Schneider Electric ? Buildings Business ? CATEE 2011 3 Performance Contracting can help? Tax Revenue Reductions Redirect funds already being spent on utilities Energy Price & Availability Issues Equip you with the tools...

Goodin, E.

2011-01-01T23:59:59.000Z

44

A radiological assessment of nuclear power and propulsion operations near Space Station Freedom. Contract report, January 1988-January 1990  

SciTech Connect (OSTI)

Scenarios were identified which involve the use of nuclear power systems in the vicinity of Space Station Freedom (SSF) and their radiological impact on the SSF crew was quantified. Several of the developed scenarios relate to the use of SSF as an evolutionary transportation node for lunar and Mars missions. In particular, radiation doses delivered to SSF crew were calculated for both the launch and subsequent return of a Nuclear Electric Propulsion (NEP) cargo vehicle and a Nuclear Thermal Rocket (NTR) personnel vehicle to low earth orbit. The use of nuclear power on co-orbiting platforms and the storage and handling issues associated with radioisotope power systems were also explored as they relate to SSF. A central philosophy in these analyses was the utilization of a radiation dose budget, defined as the difference between recommended dose limits from all radiation sources and estimated doses received by crew members from natural space radiations. Consequently, for each scenario examined, the dose budget concept was used to identify and quantify constraints on operational parameters such as launch separation distances, returned vehicle parking distances, and reactor shutdown times prior to vehicle approach. The results indicate that realistic scenarios do not exist which would preclude the use of nuclear power sources in the vicinity of SSF. The radiation dose to the SSF crew can be maintained at safe levels solely by implementing proper and reasonable operating procedures.

Bolch, W.E.; Thomas, J.K.; Peddicord, K.L.; Nelson, P.; Marshall, D.T.; Busche, D.M.

1990-03-01T23:59:59.000Z

45

CONTRACTING UNIVERSITY COUNSEL  

E-Print Network [OSTI]

CONTRACTING GUIDELINES HANDBOOK OFFICE OF UNIVERSITY COUNSEL The College of William & Mary #12................................................................................................................2 Contract Basics Office of Procurement....................................................................................................4 Contract Basics

Swaddle, John

46

Contracting with Externalities  

E-Print Network [OSTI]

available on-line 97-259* "Contracting with Externalities."Paper N o . 97-259 Contracting with Externalities Ilya Segaltakeovers, vertical contracting, Coase theorem, mechanism

Segal, Ilya

1997-01-01T23:59:59.000Z

47

Contracting for Information  

E-Print Network [OSTI]

and R. Strausz. 2001. “Contracting with Imperfect CommitmentContracting for Information (Preliminary and Incomplete) ?situations, some form of contracting is possible. In this

Krishna, Vijay; Morgan, John

2003-01-01T23:59:59.000Z

48

Where do firms manage earnings?  

E-Print Network [OSTI]

Despite decades of research on how, why, and when companies manage earnings, there is a paucity of evidence about the geographic location of earnings management within multinational firms. In this study, we examine where ...

Dyreng, Scott D.

49

Purchasing & Contracting 742-3844 TTU CONTRACT ROUTING SHEET Contract # FOAP Contract amount $  

E-Print Network [OSTI]

Purchasing & Contracting 742-3844 TTU CONTRACT ROUTING SHEET Contract # FOAP Contract amount. Routing Sheet must be signed by department. Contract (brief description of scope) Board approval required? Yes No Meeting date Board Item # Note, BOR approval is required if contract is greater than $500

Westfall, Peter H.

50

Contract Specialist  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration has been powering people and careers for nearly 75 years. We are a non-profit federal agency that provides clean, emissions-free electricity to the Pacific...

51

Avoided Costs and Competitive Negotiations for Power from Qualifying Facilities in Texas  

E-Print Network [OSTI]

. The purpose of the contract certification is to provide some comfort to the utility that the Commission will not second-guess the prudence of the agreement in future rate cases. Once the contract is certified, expenses bound by it will be considered... it to The Commission adopted the CUB methodology for C)1. ,t1atl' :tl the rate of I 1.2 percent per year. The the determination of avoided cost for firm power dilllll.l.l' in the escalation rate for energy reflect purchases. Under this methodology, the avoided cost...

Panjavan, S.; Al-Jabir, A.

52

BPA Letter announcing draft contract for Direct Service Industries...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Firm Power rate (IP rate) sufficient to meet a portion of Alcoa's load at its Intalco smelter. The proposed power sale would begin Oct. 1, 2009, and extend through Sept. 30, 2016,...

53

Contract No  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User GroupInformationE-Gov ContactsContract Management SLAC SiteJ J-J-1

54

Prime Contract  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home DesignPresentations Presentations926 2.804 2.705 2.197Contract »

55

Contract No  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RESIDENTIAL EXCHANGE INTERIM RELIEF AND STANDSTILL AGREEMENT by and between UNITED STATES OF AMERICA DEPARTMENT OF ENERGY acting by and through the BONNEVILLE POWER...

56

Microsoft Word - Cover letter regarding DSI Contract Amendment...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

block power sales contracts (2007 Block Contracts) with its direct-service industry smelter customers in light of the December 17, 2008, decision by the United States Court of...

57

Power Contracts (pbl/main)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home Design PassivePostdoctoral Opportunities Are you Your

58

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract3 First

59

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract3

60

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract33 Third

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract33

62

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract338 4 th

63

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract338 4 th1

64

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract338 4

65

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract338 43 rd

66

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract338 43

67

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract338 431

68

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract338

69

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract338Third

70

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThird Quarter Overall Contract and Project Management

71

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThird Quarter Overall Contract and Project

72

RECRUITMENT SEARCH FIRMS HUMAN RESOURCES  

E-Print Network [OSTI]

RECRUITMENT SEARCH FIRMS HUMAN RESOURCES GUIDELINES Workforce Planning | Washington Square, San by the Workforce Planning Unit in Human Resources at SJSU. Process Consistent, defensible processes for evaluating of the recruitment. - At this meeting, the Workforce Planning analyst can provide contact information for search

Su, Xiao

73

Contract and Procedure  

E-Print Network [OSTI]

This paper examines both the theoretical underpinnings and empirical picture of procedural contracts. Procedural contracts may be understood as contracts in which parties regulate not merely their commercial relations but also the procedures...

Drahozal, Christopher R.

2011-01-01T23:59:59.000Z

74

Contract Management Certificate Program  

E-Print Network [OSTI]

Contract Management Certificate Program Accelerate Your Career BusinessandManagement extension bearing the UC seal signifies a well- known, uncompromising standard of academic excellence. #12;Contract Management Certificate Program UC Irvine Extension's Contract Management Certificate Program focuses on core

Rose, Michael R.

75

Contracting for Collaborative Services  

E-Print Network [OSTI]

e?ects and the limits of contracting: A study of the Indian2007. Performance contracting in after-sales service supplyM. A. 1999. Supply chain contracting and coordination with

Roels, G.; Karmarkar, U.; Carr, S.

2008-01-01T23:59:59.000Z

76

UESC Contracting Officer Issues  

Broader source: Energy.gov (indexed) [DOE]

MAY 23, 2013 Presented by: Alice Oberhausen Former DoD Contracting Officer UESC PROCESSES - CONTRACTING OFFICER LINGERING QUESTIONS * With so much legislation surrounding the...

77

Contracting Officers Guidebook  

Broader source: Energy.gov (indexed) [DOE]

Contracting Officers Guidebook Energy Lawyers and Contracting Officers Working Group April 12, 2012 Federal Utility Partnership Working Group Spring 2012 Jekyll Island, GA UESC...

78

UESC Contracting Guide  

Broader source: Energy.gov (indexed) [DOE]

Contracting Guide Karen Thomas National Renewable Energy Laboratory Purpose of the UESC Guide * The UESC Contracting Guide will include: - Information, sample documents, and...

79

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

80

IT investments and firm performance across economies  

E-Print Network [OSTI]

Research has shown a positive relationship between IT investments and firm performance. But the results vary across firms and performance measures. Evidence indicates that IT resource allocations, in the form of investment ...

Sahu, Rakesh

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Proposal for the Award of a Blanket Contract for the Supply and Installation of Optical Fibre Cabling Systems  

E-Print Network [OSTI]

This document concerns the award of a blanket contract for the supply and installation of optical fibre cabling systems. Following a market survey carried out among 41 firms in thirteen Member States, a call for tenders (IT-3120/ST/LHC) was sent on 26 February 2003 to three firms and two consortia each consisting of two firms, in six Member States. By the closing date, CERN had received five tenders from the three firms and two consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with DRAKA (NL), the lowest bidder, for the supply and installation of optical fibre cabling systems for a total estimated amount not exceeding 12 150 000 Swiss francs, subject to revision for inflation from 1 January 2006. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: NL - 38%; CH - 37%; DE - 12%; FR - 8%; GB - 5%.

2003-01-01T23:59:59.000Z

82

Production Economics Modeling and Analysis of Polluting firms: The Production Frontier Approach  

E-Print Network [OSTI]

As concern grows about energy and environment issues, energy and environmental modeling and related policy analysis are critical issues for today's society. Polluting firms such as coal power plants play an important role in providing electricity...

Mekaroonreung, Maethee

2012-10-19T23:59:59.000Z

83

NASULGC survey-Colorado findings The National Association of State Universities and Land Grant Colleges contracted with a  

E-Print Network [OSTI]

Colleges contracted with a consulting firm, Copernicus, to survey the nation regarding the value members of a representative online panel; criteria included gender, age, urban/rural, ethnicity, education should address are: o Energy ­ biofuels, solar,

84

OVERVIEW OF CONTRACTING OPTIONS  

E-Print Network [OSTI]

OVERVIEW OF CONTRACTING OPTIONS Presented by Bill McNally July 24, 2012 #12;National Aeronautics and Space Administration Selecting the Right Contract Type · Objective ­ Negotiate a contract type and price a Contract Type · What are your acquisition's objectives? ­ New program? ­ Existing program? (Historical

Waliser, Duane E.

85

Technical Consultant Contract  

Broader source: Energy.gov [DOE]

Technical Consultant Contract, from the Tool Kit Framework: Small Town University Energy Program (STEP).

86

Communication Consultant Contract  

Broader source: Energy.gov [DOE]

Communication Consultant Contract, from the Tool Kit Framework: Small Town University Energy Program (STEP).

87

ESPC IDIQ Contract Sample  

Broader source: Energy.gov [DOE]

Document displays a sample indefinite delivery, indefinite quantity (IDIQ) energy savings performance contract (ESPC).

88

Microsoft Word - BPA analysis summarizing CFAC block contract...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Agreement (Block Contract) to Columbia Falls Aluminum Company (CFAC), an aluminum smelter in Columbia Falls, Montana, at the Industrial Power (IP) rate and how it comports...

89

Special Contract Requirements Enclosure 2 INSTRUCTIONS TO CONTRACTING OFFICERS: The Special Contract Requirement "Workers  

E-Print Network [OSTI]

Special Contract Requirements Enclosure 2 INSTRUCTIONS TO CONTRACTING OFFICERS: The Special Contract Requirement "Workers Compensation Insurance (Defense Base Act) (APRIL 2011)" shall be included in the contract as applicable. Whenever Defense Base Act (DBA) insurance is required under the contract

US Army Corps of Engineers

90

FYE 2014 Training Contracting and Procurement  

E-Print Network [OSTI]

FYE 2014 Training Contracting and Procurement Services #12;Contracting and Procurement Services Contracts Officer Paul Thomas Contracts Associate Bryanne Grafton Contract Specialist Hanna Emerson Student Employee Rafia Imran Contracts Officer Stacey Balenger Contracts Officer Martha Kierstead Contracts Officer

Caughman, John

91

Contract Major Report Form Name __________________________  

E-Print Network [OSTI]

Contract Major Report Form 12/1/94 Name __________________________ Degree __________________________ College __________________________ Descriptive title of contract major _______________________________________________ Current GAP is ___________ in ___________________ hours attempted. Summary of Proposed contract Major 1

Kostic, Milivoje M.

92

Strategic Freight Transportation Contract Procurement  

E-Print Network [OSTI]

for truckload service contract procurement. Truckloadgiven the details of new service contracts including: demandin auctions for freight service contract procurement. 1.3.1

Nandiraju, Srinivas

2006-01-01T23:59:59.000Z

93

Nonresident Alien Professional Services Contract  

E-Print Network [OSTI]

Nonresident Alien Professional Services Contract (This Contract form should be completed before Services: #12;Nonresident Alien Professional Services Contract Michigan State University is an affirmative

Liu, Taosheng

94

Shared-savings firm goes out of business: PMI users left with unserviced, malfunctioning equipment  

SciTech Connect (OSTI)

Some customers of Performance Management Inc. (PMI) are left with non-functioning and the possible removal of equipment now that the shared-savings financing firm has gone out of business. PMI's departure from the contracts leaves no service or maintenance funds for the 50 to 100 installations in the field. Officials from most of the equipment manufacturers denied knowledge of PMI, which dealt only with independent installers and customers under a contract that called for users to share energy savings with PMI in exchange for PMI financing for installation and service. (DCK)

Galvin, C.

1983-05-23T23:59:59.000Z

95

Site: Contract Name: Contractor: Contract Number: Contract Type...  

Office of Environmental Management (EM)

EM Contractor Fee Sep-14 Portsmouth Paducah Project Office Paducah Remediation Contract LATA of Kentucky 12,231,233 Cost Plus Award Fee 403,310,497 July 2010 - July 2015...

96

Essays in dynamic contracting  

E-Print Network [OSTI]

This thesis examines three models of dynamic contracting. The first model is a model of dynamic moral hazard with partially persistent states, and the second model considers relational contracts when the states are partially ...

Kwon, Suehyun

2012-01-01T23:59:59.000Z

97

AWARD/CONTRACT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to sign this document.) Your offer on 18. , 20C. DATE SIGNED (Signature of the Contracting Officer) 20B. UNITED STATES OF AMERICA 20A. NAME OF CONTRACTING OFFICER 19B. NAME...

98

AWARD/CONTRACT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to sign this document.) Your bid on 18. , 20C. DATE SIGNED (Signature of the Contracting Officer) 20B. UNITED STATES OF AMERICA 20A. NAME OF CONTRACTING OFFICER 19B. NAME...

99

Negligent Misrepresentation as Contract  

E-Print Network [OSTI]

393. Arthur L. Harding, Williston’s Fundamental Conceptions1920), Vol 1 at 3-5. Williston’s view that contract strictlytouchstone for this. Williston, Contracts (1 st ed. 1920),

Gergen, Mark P

2011-01-01T23:59:59.000Z

100

International technology transfer, firm productivity and employment.  

E-Print Network [OSTI]

??This dissertation contributes to the empirical literature on the effects of international technology transfer on firms' productivity and employment in developing and transition countries. It… (more)

Pantea, Smaranda

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

CONTRACTIVE AND COMPLETELY CONTRACTIVE HOMOMORPHISMS OF PLANAR ALGEBRAS  

E-Print Network [OSTI]

CONTRACTIVE AND COMPLETELY CONTRACTIVE HOMOMORPHISMS OF PLANAR ALGEBRAS TIRTHANKAR BHATTACHARYYA AND GADADHAR MISRA Abstract. We consider contractive homomorphisms of a planar algebra A() over a finitely connected bounded domain C and ask if they are necessarily completely contractive. We show

Misra, Gadadhar

102

Building Relationships with Executive Search Firms Building Relationships with Executive Search Firms  

E-Print Network [OSTI]

Relationships Similar Searches Alumni Organizations Education Company Team - Sports Job Hunting / NetworkingBuilding Relationships with Executive Search Firms for Building Relationships with Executive Search Firms for Weiner & Associates, Inc. Executive Search Partners Weiner & Associates, Inc. Executive Search

Ferrari, Silvia

103

Externalities of public firm presence: Evidence from private firms' investment decisions  

E-Print Network [OSTI]

Public firms provide a large amount of information through their disclosures. In addition, information intermediaries publicly analyze, discuss, and disseminate these disclosures. Thus, greater public firm presence in an ...

Badertscher, Brad

104

GRADUATE CONTRACTING Associate Provost  

E-Print Network [OSTI]

GRADUATE CONTRACTING Tom Boyd Associate Provost #12;Institutional Policies Graduate Employment://gradschool.mines.edu/GS-Assistantship-Policies Commonly Asked Questions Include: ­ Contract types and purposes? Teaching Assistants: Awarded to assist paid; either by the student, the research contract, or the institution. ­ Which components

105

ADMINISTRATION CONTRACT NO.  

E-Print Network [OSTI]

MANAGEMENT AND OPERATING CONTRACT FOR THE LOS ALAMOS NATIONAL LABORATORY NATIONAL NUCLEAR SECURITY ADMINISTRATION CONTRACT NO. DE-AC52-06NA25396 DECEMBER 21, 2005 1943 Today Unofficial Conformed Copy as of 1 OF ENERGY NATIONAL NUCLEAR SECURITY ADMINISTRATION NNSA SERVICE CENTER- ALBUQUERQUE M&O CONTRACT SUPPORT

106

State Contracting and Procurement  

E-Print Network [OSTI]

State Contracting and Procurement Registration System (SCPRS) Illustrated User Manual #12;2 State Contracting and Procurement Registration System (SCPRS) Rev. 4/23/09 Copyright © 2008 RFP Depot, LLC dba Bid@bidsync.com Website: http://www.bidsync.com #12;3 State Contracting and Procurement Registration System (SCPRS) Rev. 4

107

Proposal for the award of a contract for the supply of global protection units for the LHC  

E-Print Network [OSTI]

This document concerns the award of a contract for the supply of 250 global protection units for the LHC. Following a market survey carried out among 89 firms in seventeen Member States, a call for tenders (IT-3097/AT/LHC) was sent on 23 July 2003 to 17 firms and one consortium in eleven Member States. By the closing date, CERN had received 12 tenders from 12 firms in eight Member States. The Finance Committee is invited to agree to the negotiation of a contract with INSTEM TECHNOLOGIES (GB), the lowest bidder after realignment, for the supply of 250 global protection units for a total amount of 1 043 047 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: GB - 95%; FR - 5%.

2003-01-01T23:59:59.000Z

108

Page 1 of 12 CONTRACTOR NAME CONTRACT # CONTRACT  

E-Print Network [OSTI]

Page 1 of 12 CONTRACTOR NAME CONTRACT # CONTRACT START CONTRACT EXPIRE ADDRESS LINE 1 CITY STATE-3-/850/10/31/14 11-01-2011 10-31-2014 21 Griffin Road North Windsor CT 06095 Jennifer Peshka CONTRACTOR NAME CONTRACT # CONTRACT START CONTRACT EXPIRE ADDRESS LINE 1 CITY STATE ZIP CODE CONTACT NAME CDM Smith 005

Holsinger, Kent

109

Proposal for the award of two blanket contracts for the supply of high-grade helium  

E-Print Network [OSTI]

This document concerns the supply of up to 280 000 kg of high-grade helium. Following a call for tenders (IT-3235/AT) sent on 4 July 2003 to seven firms, in four Member States, CERN had, by the closing date, received six tenders from six firms in four Member States. The Finance Committee is invited to agree to the negotiation of two blanket contracts for the supply of up to 280 000 kg of high-grade helium with AIR PRODUCTS (FR) and CARBAGAS (CH) for a total maximum amount for both contracts of 5 577 800 US dollars (7 736 400 Swiss francs), not subject to revision, for a period of four years starting 1 January 2004. The rates of exchange used are those stipulated in the tenders. The firms have indicated the following distribution by country of the contract value covered by this adjudication proposal: AIR PRODUCTS : PL - 100%; CARBAGAS : PL - 100%.

2003-01-01T23:59:59.000Z

110

Real Time Pricing and the Real Live Firm  

SciTech Connect (OSTI)

Energy economists have long argued the benefits of real time pricing (RTP) of electricity. Their basis for modeling customers response to short-term fluctuations in electricity prices are based on theories of rational firm behavior, where management strives to minimize operating costs and optimize profit, and labor, capital and energy are potential substitutes in the firm's production function. How well do private firms and public sector institutions operating conditions, knowledge structures, decision-making practices, and external relationships comport with these assumptions and how might this impact price response? We discuss these issues on the basis of interviews with 29 large (over 2 MW) industrial, commercial, and institutional customers in the Niagara Mohawk Power Corporation service territory that have faced day-ahead electricity market prices since 1998. We look at stories interviewees told about why and how they respond to RTP, why some customers report that they can't, and why even if they can, they don't. Some firms respond as theorized, and we describe their load curtailment strategies. About half of our interviewees reported that they were unable to either shift or forego electricity consumption even when prices are high ($0.50/kWh). Reasons customers gave for why they weren't price-responsive include implicit value placed on reliability, pricing structures, lack of flexibility in adjusting production inputs, just-in-time practices, perceived barriers to onsite generation, and insufficient time. We draw these observations into a framework that could help refine economic theory of dynamic pricing by providing real-world descriptions of how firms behave and why.

Moezzi, Mithra; Goldman, Charles; Sezgen, Osman; Bharvirkar, Ranjit; Hopper, Nicole

2004-05-26T23:59:59.000Z

111

Teaching CPS Foundations With Contracts Andre Platzer  

E-Print Network [OSTI]

extends to many other areas, includ- ing power plants [4], the whole power grid [5], or medical CPS [6 the result of such a succession. II. CPS FOUNDATIONS EDUCATION With CPS principles and technologies becomingTeaching CPS Foundations With Contracts Andr´e Platzer Computer Science Department Carnegie Mellon

Platzer, André

112

WHAT'S NEW FOR CONTRACTING OFFICERS  

Office of Environmental Management (EM)

CHAPTER 42.101 WHAT'S NEW FOR CONTRACTING OFFICERS The Contracting Officer must obtain a waiver from the Procurement Director...

113

Dynamic Efficiency and the Regulated Firm: Evidence from Interfirm Trade in Electricity Markets  

E-Print Network [OSTI]

PWP-033 Dynamic Efficiency and the Regulated Firm: Evidence from Interfirm Trade in Electricity on Workable Energy Regulation (POWER). POWER is a program of the University of California Energy Institute of California Energy Institute 2539 Channing Way Berkeley, California 94720-5180 www.ucei.berkeley.edu/ucei #12

California at Berkeley. University of

114

Energy Performance Contracting for Texas: The Collaborative Process  

E-Print Network [OSTI]

to the firm that can best achieve the results envisioned by the Owner. Two methods may be used for selecting providers of performance based projects. The Request for Qualifications (RFQ) method and the Request for Proposals (RFP) method. The subcommittee... requirements must be followed when selecting a provider by means of RFQ or RFP. Although it is not required it is highly recommended that school districts adopt the guidelines for developing contracts. EARS, M&V, and periodic energy savings reports...

Huff, H.; Matthews, J.

1998-01-01T23:59:59.000Z

115

Institutional Investors, Managerial Incentives, and Firms' Risk Profiles  

E-Print Network [OSTI]

(Vega). Instead, I find that institutional investors appear to influence the risk profile of firm through the firm’s investment, financing and diversification policy choices even after I control for the CEO’s compensation structure. The results suggest...

Celil, Hursit S

2013-04-11T23:59:59.000Z

116

Distributed Generation Standard Contracts  

Broader source: Energy.gov [DOE]

'''''Note: The second enrollment period for standard contracts in 2013 closed June 28. The third is scheduled to begin in September.'''''

117

Utility Energy Service Contracts  

Broader source: Energy.gov [DOE]

Utility energy service contracts (UESCs) offer Federal agencies an effective means to implement energy-efficiency, renewable-energy, and water-efficiency projects.

118

Internship Contract (Includes Practicum)  

E-Print Network [OSTI]

Internship Contract (Includes Practicum) Student's name-mail: _________________________________________ Internship Agency Contact Agency Name: ____________________________________ Address-mail: __________________________________________ Location of Internship, if different from Agency: ________________________________________________ Copies

Thaxton, Christopher S.

119

Colorado Firm Develops Innovative Materials for Geothermal Systems...  

Energy Savers [EERE]

Colorado Firm Develops Innovative Materials for Geothermal Systems Colorado Firm Develops Innovative Materials for Geothermal Systems April 18, 2013 - 12:00am Addthis With support...

120

Honors Contract Form Instructions Part A: Initiating a Contract  

E-Print Network [OSTI]

Honors Contract Form Instructions Part A: Initiating a Contract This entire section should students to spend some time thinking about why they are contracting the specific course and what they expect to get out of it the contract. Honors Contract Activities Section: There are four separate boxes

Huang, Haiying

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Contracting Out of Service Activities and the Effects on Sectoral Employment Patterns in South Africa  

E-Print Network [OSTI]

1 CONTRACTING OUT OF SERVICE ACTIVITIES AND THE EFFECTS ON SECTORAL EMPLOYMENT PATTERNS IN SOUTH AFRICA FIONA TREGENNA Faculty of Economics, University of Cambridge ABSTRACT This paper develops a methodology and uses household... in (private) services, on the other hand, has grown both absolutely and as a share of GDP. 2 By outsourcing we refer to the contracting out to external agents of activities previously performed in-house1. Since the firms to which these activities...

Tregenna, Fiona

122

Concentrating Solar Power (Fact Sheet), SunShot Initiative, U...  

Broader source: Energy.gov (indexed) [DOE]

Concentrating Solar Power Concentrating Solar Power (CSP) offers a utility-scale, firm, dispatchable renewable energy option that can help meet the nation's goal of making solar...

123

Two decades before launching Clipper, its founder, James Dehlsen, had started Zond, a pioneering U.S. wind power firm. Zond worked closely with NREL, and once it was acquired by  

E-Print Network [OSTI]

allowed exploration of the turbine's variable-speed design. Beginning in 2002, Clipper was able to build conditions. This process uncovered what one researcher described as irresoluble prob- lems turbine features a new lightweight, enlarged rotor that increases power production, a revolutionary

124

Essays on taxation and firm behavior  

E-Print Network [OSTI]

This dissertation consists of three essays that examine the impact of tax policy of firm behavior. The first chapter uses new well-level production data on California oil wells and after-tax producer prices to estimate how ...

Rao, Nirupama S

2010-01-01T23:59:59.000Z

125

Empirical essays on firm behavior in India  

E-Print Network [OSTI]

In this thesis, I study the behavior of industrial firms in India in the electricity market and with respect to locational choice and environmental regulation. In the first chapter, I study the competitive effects of ...

Ryan, Nicholas (Nicholas James)

2012-01-01T23:59:59.000Z

126

Alabama Power- UESC Activities  

Broader source: Energy.gov [DOE]

Presentation—given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses Alabama Power and its utility energy service contract (UESC) projects and activities.

127

An Overview of Computer Power for JSC Facilities  

E-Print Network [OSTI]

program needs to be changed. The work is accom? plished by the M&O service contract and monitored by PED engineers. Craftsmen proficiencies and tech? niques are kept current through training programs. Specialty consultants and repair firms augment...

Gieck, W. C.

128

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

L. Eanes Senior Manager Prime Contract and Export Control 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) James Pohorence, Contracting Officer M&O Contracting...

129

Appointment of Contracting Officers and Contracting Officer Representatives  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order established procedures governing the selection, appointment and termination of Department of Energy contracting officers and contracting officer representatives. Cancels DOE O 541.1A.

2004-04-21T23:59:59.000Z

130

CONTRACTS AND PROCUREMENT OPERATIONS MANUAL  

E-Print Network [OSTI]

CONTRACTS AND PROCUREMENT OPERATIONS MANUAL California State University, Fullerton Division University, Fullerton Contracts and Procurement P a g e | 1 Table of Contents ALPHABETICAL INDEX OF TERMS.........................................................................................................................14 CONTRACTS AND PROCUREMENT OPERATIONS

de Lijser, Peter

131

The behavioral theory of contract  

E-Print Network [OSTI]

This work develops a theory of contract grounded in empirical analysis of individuals' experience with and interpretations of form-adhesive contracts. Form-adhesive contracts are unilaterally drafted, typically by ...

Eigen, Zev J. (Zev Jacob)

2009-01-01T23:59:59.000Z

132

GTS Contracting System Context Diagram  

E-Print Network [OSTI]

GTS Contracting System Context Diagram Rejected P.O. and invalid letter Agency 0. Contracting;Agency GTS Contracting System "Level 0" Diagram P.O. 2.0 Review P.O. Contract info Valid PO: PO# outstanding flag Not Valid PO: Letter P.O. and invalid letter 1.0 Enter P.O. Contract/PO DB Contract #, P.O. 3

Schweik, Charles M.

133

Financial Bilateral Contract Negotiation in Wholesale Electricity Markets  

E-Print Network [OSTI]

1 Financial Bilateral Contract Negotiation in Wholesale Electricity Markets Using Nash Bargaining and a load-serving entity in a wholesale electric power market with congestion managed by locational marginal and price biases. Index Terms--Wholesale electricity market, financial bilateral contract, negotiation

Tesfatsion, Leigh

134

WHAT'S NEW FOR CONTRACTING OFFICERS  

Energy Savers [EERE]

will provide the best value in a competition for a cost- reimbursement contract and pricing the cost-reimbursement contract fairly and reasonably are Audit Requirements for...

135

Contract Mapper Full Symbology List  

E-Print Network [OSTI]

Contract Mapper Full Symbology List Colour symbology Operational Support Unit 15th October 2007 Main Road Management Area Other Fell Thin Compartments Sub-Compartments Contract Buffer Order

136

Contract Mapper Full Symbology List  

E-Print Network [OSTI]

Contract Mapper Full Symbology List Black & White symbology Operational Support Unit 15th October Compartments Sub-Compartments # # ## Management Area Fell Thin Contract Buffer Other #12;

137

Contracts and Procurement Procurement Programs  

E-Print Network [OSTI]

Contracts and Procurement Procurement Programs OfficeMax Program KTEK Recycled Toner cartridges from KTEK are now the preferred product offered on the CSU contract discount price list

de Lijser, Peter

138

Nexans & Pirelli Awarded Major Energy Sector Contract  

E-Print Network [OSTI]

km (56 miles) of new high-voltage cables. The contract calls for the manufacture and laying of three. Pirelli will manufacture and install two submarine power cables and one telecommunications cable. These cables will be manufactured at Pirelli's Arco Felice (Naples), Italy plant. The Pirelli share

Kavehrad, Mohsen

139

CONTRACTIVITY IN TURBO ITERATIONS Phillip A. Regalia  

E-Print Network [OSTI]

CONTRACTIVITY IN TURBO ITERATIONS Phillip A. Regalia Department of Communications, Image Fourier 91011 Evry cedex France Phillip.Regalia@int-evry.fr ABSTRACT The turbo decoding algorithm has met with intense study over the past decade, in an attempt to harness the full power of the "turbo principle". Here

Regalia, Phillip A.

140

Proposal for the award of a contract for the assembly of MQ-DS type cold masses for the LHC  

E-Print Network [OSTI]

This document concerns the award of a contract for the assembly of 32 MQ-DS type cold masses for the short straight sections of the dispersion suppressor and matching regions of the LHC. Following a call for tenders (IT-3062/AT/LHC) sent on 5 September 2003 to six firms in three Member States, CERN received two tenders from two firms in two Member States. The Finance Committee is invited to agree to the negotiation of a contract with ACCEL INSTRUMENTS (DE), for the assembly of MQ-DS type cold masses of two different dimensions for a total amount of 4 939 194 euros (7 636 000 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 72 %; GB - 23%; IT - 5%.

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Do Private Firms Invest Dierently than Public Firms? Taking Cues from the Natural Gas Industry  

E-Print Network [OSTI]

Do Private Firms Invest Dierently than Public Firms? Taking Cues from the Natural Gas Industry Erik and public rms using a unique dataset of onshore U.S. natural gas producers. In rm-level regressions we nd that investments by private rms are 68% less responsive to changes in natural gas prices, a measure that captures

Lin, Xiaodong

142

Site: Contract Name: Contractor: Contract Number: Contract Type:  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartmentRestrictionsExampleofDepartmentDepartment ofPlan Period: Contract

143

Supply chain contract design in supplier- versus buyer-driven channels  

E-Print Network [OSTI]

In the context of supply contract design, the more powerful party has the lib- erty of withholding private information which also improves its bargaining power. Traditionally, the supplier (e.g., manufacturer) has been more powerful, and, hence...

Liu, Xingchu

2006-08-16T23:59:59.000Z

144

Contractive and completely contractive modules, matricial tangent vectors  

E-Print Network [OSTI]

Contractive and completely contractive modules, matricial tangent vectors and distance decreasing a finite dimensional Hilbert module over H() and that the module is contractive if and only if C, (v tensor product norm then again the module is contractive if and only if V is less or equal to one

Misra, Gadadhar

145

Contract Database Number: ______________ Boise State University CONTRACT ROUTING FORM  

E-Print Network [OSTI]

Contract Database Number: ______________ Boise State University CONTRACT ROUTING FORM BSU Policy 1030 requires original copies of all contracts meeting certain criteria to be housed in the Archive Library. This form must accompany ALL Contracts submitted to the Office of the General Counsel. Please

Barrash, Warren

146

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90%...

147

Energy Performance Contracting  

Broader source: Energy.gov [DOE]

Provides an Energy Savings Performance Contracting (ESPC) overview and summary of ESPC resources, including training, sample documents, and guides from the U.S. Department of Housing and Urban Development. Author: U.S. Department of Housing and Urban Development

148

The Minimum Price Contract  

E-Print Network [OSTI]

A minimum price contract is one of many tools a marketer may use to better manage price and production risk while trying to achieve financial goals and objectives. This publication discusses the advantages and disadvantages involved...

Waller, Mark L.; Amosson, Stephen H.; Welch, Mark; Dhuyvetter, Kevin C.

2008-10-17T23:59:59.000Z

149

Energy Savings Performance Contracts  

Broader source: Energy.gov [DOE]

An Energy Savings Performance Contract (ESPC) is a partnership between a system owner and an Energy Services Company (ESCO). The ESCO conducts a comprehensive energy audit for the facility under...

150

Attorney-Adviser (Contract)  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) is looking for one government contracts attorney to serve in the Office of the Assistant General Counsel for Procurement and Financial Assistance. This legal office...

151

_Part II - Contract Clauses  

National Nuclear Security Administration (NNSA)

14 Contract DE-AC04-94AL85000 Modification No. M202 (4) Environmentally preferable and energy efficient electronics including desktop computers, laptops and monitors are at...

152

Green Initiatives and Contracting  

Energy Savers [EERE]

Buying Electric Trucks Contract Award Date: April 13, 2011 Amount of Award: 1,476,831 SMITH ELECTRIC VEHICLES US CORP.,KANSAS CITY,MISSOURI 9 Missouri State Purchasing Program...

153

Power Sales to Electric Utilities  

SciTech Connect (OSTI)

The Public Utilities Regulatory Policies Act (PURPA) of 1979 requires that electrical utilities interconnect with qualifying facilities and purchase electricity at a rate based upon their full avoided costs (i.e., costs of providing both capacity and energy). Qualifying facilities (QF) include solar or geothermal electric units, hydropower, municipal solid waste or biomass-fired power plants, and cogeneration projects that satisfy maximum size, fuel use, ownership, location, and/or efficiency criteria. In Washington State, neither standard power purchase prices based upon a proxy ''avoided plant'', standard contracts, or a standard offer process have been used. Instead, a variety of power purchase contracts have been negotiated by developers of qualifying facilities with investor-owned utilities, public utility districts, and municipally-owned and operated utilities. With a hydro-based system, benefits associated with resource acquisition are determined in large part by how compatible the resource is with a utility's existing generation mix. Power purchase rates are negotiated and vary according to firm energy production, guarantees, ability to schedule maintenance or downtime, rights of refusal, power plant purchase options, project start date and length of contract; front-loading or levelization provisions; and the ability of the project to provide ''demonstrated'' capacity. Legislation was also enacted which allows PURPA to work effectively. Initial laws established ownership rights and provided irrigation districts, PUDs, and municipalities with expanded enabling powers. Financial processes were streamlined and, in some cases, simplified. Finally, laws were passed which are designed to ensure that development proceeds in an environmentally acceptable manner. In retrospect, PURPA has worked well within Washington. In the state of Washington, 20 small-scale hydroelectric projects with a combined generating capacity of 77 MW, 3 solid waste-to-energy facilities with 55 MW of electrical output, 4 cogeneration projects with 34.5 MW of generating capability, and 4 wastewater treatment facility digester gas-to-energy projects with 5 MW of electrical production have come on-line (or are in the final stages of construction) since the passage of PURPA. These numbers represent only a small portion of Washington's untapped and underutilized cogeneration and renewable resource generating potentials. [DJE-2005

None

1989-02-01T23:59:59.000Z

154

Microsoft Word - BPA analysis summarizing ALCOA block contract...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sales Agreement (Block Contract) to Alcoa Inc.'s (Alcoa) Intalco Plant, an aluminum smelter in Ferndale, Washington, at the Industrial Power (IP) rate and how it comports with...

155

DR-CONTRACT: An Architecture for e-Contracts  

E-Print Network [OSTI]

DR-CONTRACT: An Architecture for e-Contracts in Defeasible Logic Guido Governatori* and Duy Hoang.governatori,duyhoang.pham}@nicta.com.au * Corresponding author Abstract: We introduce the DR-CONTRACT architecture to represent and reason on e-Contracts the choice for the logic and we show how to extend RuleML to capture the notions relevant to describe e-contracts

Governatori, Guido

156

Contracts and Grants Accounting Introduction  

E-Print Network [OSTI]

Contracts and Grants Accounting Introduction Contracts and grants are important to Auburn contracts and grants. Money provided to support sponsored projects is a significant financial resource for the University and for individual departments. Although the paperwork associated with contracts and grants often

Tam, Tin-Yau

157

Contracts Made Manifest Michael Greenberg  

E-Print Network [OSTI]

Contracts Made Manifest Michael Greenberg Benjamin C. Pierce Stephanie Weirich University of Pennsylvania 2010-01-22 / POPL '10 1 #12;First-order contracts assert(n > 0) 2 #12;First-order contracts assert(n > 0) sqrt : {x:Float | x 0} Float 2 #12;First-order contracts assert(n > 0) sqrt : {x:Float | x 0

Plotkin, Joshua B.

158

Contracts in outsourcing Chander, Hima  

E-Print Network [OSTI]

Contracts in outsourcing Chander, Hima BMI paper, September 2006 Supervisor: Dr. S. Bhulai Vrije contract, the total profit can be split between the user company and the subcontractor such that both of this paper, contracts in call center outsourcing are discussed. The contracting issues in an outsourcing

Bhulai, Sandjai

159

Contract PQQ Pre-Qualification  

E-Print Network [OSTI]

Contract PQQ Pre-Qualification Questionnaire Design, Build and Installation of Interpretation within the new Welcome Building at Westonbirt, the National Arboretum Contract No: W156/F15.90 OJEU Ref: 2012-164242 #12;Contract PQQ 5a. Contract PQQ | 2 | Version 2 04/12 Introduction The Forestry

160

Essays on Firm Growth and Survival as a Fortune 500 Firm  

E-Print Network [OSTI]

Growth and Survival as a Fortune 500 Firm. (August 2010) Gautham Gopal Vadakkepatt, B.T.C, Trichur, Calicut University; M.En.; M.S., Texas A&M University Co-Chairs of Advisory Committee: Dr. Venkatesh Shankar Dr. Rajan Varadarajan... In this dissertation, I develop frameworks and models capturing the effects of marketing capital and R&D capital on firm growth and sustained membership in the Fortune 500 cohort. Drawing on the resource-based view (RBV) of the firm and industrial organization...

Vadakkepatt, Gautham Gopal

2011-10-21T23:59:59.000Z

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

UPSTREAM COMPETITION BETWEEN VERTICALLY INTEGRATED FIRMS  

E-Print Network [OSTI]

marginal cost in equilibrium, which is detrimental to consumers' surplus and social welfare. We obtain input in order to serve final consumers. In this paper, we focus on industries in which the intermediate downstream firms, which have not built their own network. Similarly, in the mobile telephony market, Mobile

Boyer, Edmond

162

Firm Size And Higher Education Graduate  

E-Print Network [OSTI]

Firm Size And Higher Education Graduate Employment In West Virginia 2010 Summary Results For Work 2012 Prepared for the West Virginia Higher Education Policy Commission By George W. Hammond, Associate Corporation Funding for this research was provided by the West Virginia Higher Education Policy Commission

Mohaghegh, Shahab

163

Consider consulting firms beyond the major  

E-Print Network [OSTI]

for interviews. This is not a skill that can be mas- tered in one night. Re- search company websites for practice questions Insider Advice Attend career fairs and company information sessions including the Career Expo. Along with On Campus Recruiting (OCR) consulting firms may also host company presentations and even pre

Shull, Kenneth R.

164

Successful Pursuit of Small Electrical and Controls Projects by a Small Civil Engineering Firm  

E-Print Network [OSTI]

. The local Utilities may not typically have projects of interest for a civil engineering firm but will occasionally have related projects published for bid. Coal fired power plants require a large amount of water supply for cooling and creating steam... to power electrical generating turbines (7). A higher degree of water quality is continually sought to increase generation efficiency and to prolong equipment operating life. Also, the used water needs to be treated before 8 of 40 putting back...

Gates, Craig

2008-07-25T23:59:59.000Z

165

Contractions, deformations and curvature  

E-Print Network [OSTI]

The role of curvature in relation with Lie algebra contractions of the pseudo-ortogonal algebras so(p,q) is fully described by considering some associated symmetrical homogeneous spaces of constant curvature within a Cayley-Klein framework. We show that a given Lie algebra contraction can be interpreted geometrically as the zero-curvature limit of some underlying homogeneous space with constant curvature. In particular, we study in detail the contraction process for the three classical Riemannian spaces (spherical, Euclidean, hyperbolic), three non-relativistic (Newtonian) spacetimes and three relativistic ((anti-)de Sitter and Minkowskian) spacetimes. Next, from a different perspective, we make use of quantum deformations of Lie algebras in order to construct a family of spaces of non-constant curvature that can be interpreted as deformations of the above nine spaces. In this framework, the quantum deformation parameter is identified as the parameter that controls the curvature of such "quantum" spaces.

Angel Ballesteros; Francisco J. Herranz; Orlando Ragnisco; Mariano Santander

2007-06-15T23:59:59.000Z

166

Non-traditional growth in large, established firms  

E-Print Network [OSTI]

Firms must continuously strive to grow through the creation of new sources of competitive advantage. The challenges to growth are more severe for large, established firms that derive a predominant amount of their present ...

Sunderrajan, Suresh, 1970-

2004-01-01T23:59:59.000Z

167

Product service transformation in product-centric firms  

E-Print Network [OSTI]

In slow or no-growth economies, firms cannot rely solely on recurring business from large, core customers who often delay or cancel capital investments in belt-tightening times. To achieve growth, firms must lever domain ...

Levitt, Benjamin (Benjamin P.)

2014-01-01T23:59:59.000Z

168

Start-up manufacturing firms: operations for survival   

E-Print Network [OSTI]

Start-up firms play an important role in the economy. Statistics show that a large percent of start-up firms fail after few years of establishment. Raising capital, which is crucial to success, is one of the difficulties ...

Liu, Kuangyi

2009-11-25T23:59:59.000Z

169

The impact of financial incentives on firm behavior  

E-Print Network [OSTI]

This dissertation analyzes the impact of various financial incentives on firm behavior. The first two chapters examine product-market and input-market effects of a firm's capital structure and the incentives they create. ...

Matsa, David

2006-01-01T23:59:59.000Z

170

Contract-Open ITT Invitation to Tender  

E-Print Network [OSTI]

Contract-Open ITT Invitation to Tender for Contract for Traffic Management Service for Westonbirt Arboretum, Gloucestershire 2012 - 2017 Contract No: FC/WE/TRAFFIC/12-17 #12;Contract-Open ITT 6e. Contract is available on our website at www.forestry.gov.uk 1 Type and term of contract We will be awarding a contract

171

Contract-Open ITT Invitation to Tender  

E-Print Network [OSTI]

Contract-Open ITT Invitation to Tender for Deer Control Contract ­ Dumfries & Borders Forest District Contract No:714/Wildlife/2012/03 #12;Contract-Open ITT 6e. Contract-Open ITT | 2 | Version 31.forestry.gov.uk 1 Type and term of contract We will be awarding a contract for Deer Culling in South Scotland

172

Appointment of Contracting Officers and Contracting Officer Representatives  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish procedures governing the selection, appointment, and termination of contracting officers and for the appointment of contracting officer representatives. Cancels DOE Order 4200.4A. Canceled by DOE O 541.1A.

1996-04-30T23:59:59.000Z

173

Power Marketing and Contracts in RM  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

requirements for FERC Order 890 as outlined in Western's Open Access Transmission Tariff. Final Agenda - Meeting Transmission Challenges in the Rocky Mountain Region...

174

CRSP Power Marketing and Contracts default  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6Energy,MUSEUM DISPLAY STATUS AND

175

BPA Power Subscription (pbl/contracts)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6 M. Babzien, I. Ben-Zvi, P. Study of SmartRates

176

Power Marketing and Contracts in RM  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home Design PassivePostdoctoral Opportunities Are youMeeting

177

Power Marketing and Contracts in RM  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home Design PassivePostdoctoral Opportunities Are youMeetingRM's

178

Contracting Around Hall Street  

E-Print Network [OSTI]

This Article examines the extent to which expanded court review of arbitration awards remains available after the Supreme Court’s decision in Hall Street Associates, L.L.C. v. Mattel, Inc. - that is, whether parties can contract around Hall Street...

Drahozal, Christopher R.

2010-01-01T23:59:59.000Z

179

Introduction to Energy Performance Contracting | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Introduction to Energy Performance Contracting Introduction to Energy Performance Contracting Provides a tutorial in the fundamentals of Energy Savings Performance Contracting...

180

The Law and Economics of Costly Contracting  

E-Print Network [OSTI]

Markets, Relational Contracting, New York: Free Press (and the Value of Contracting,” 89 American Economic ReviewLAW AND ECONOMICS OF COSTLY CONTRACTING BY ALAN SCHWARTZ AND

Schwartz, Alan; Watson, Joel

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Contracting with reading costs and renegotiation costs  

E-Print Network [OSTI]

OF CALIFORNIA, SAN DIEGO Contracting with Reading Costs andrents, and the competitive contracting process. Journal ofReiche. Foundation of incomplete contracting in a model of

Brennan, James R.

2007-01-01T23:59:59.000Z

182

Prison Health Care: Is Contracting Out Healthy?  

E-Print Network [OSTI]

of prison health care contracting would benefit from bettermight distinguish between contracting out to profit- seekingDeath Count Table 1. Contracting Percentage (Measured at the

Bedard, Kelly; Frech, Ted E

2007-01-01T23:59:59.000Z

183

Energy Savings Performance Contracting | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Savings Performance Contracting Energy Savings Performance Contracting Energy Savings Performance Contracting (ESPC) is a budget-neutral approach to make building improvements that...

184

Contracting for Information under Imperfect Commitment  

E-Print Network [OSTI]

and Strausz, Roland. “Contracting with Imperfect CommitmentPaper No. CPC05-051 Contracting for Information undercommitment, optimal contracting, delegation Abstract:

Krishna, Vijay; Morgan, John

2004-01-01T23:59:59.000Z

185

Energy Performance Contracting in State Facilities | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Contracting in State Facilities Energy Performance Contracting in State Facilities Provides a brief overview of the performance contracting process, the benefits of using...

186

Communication Consultant Contract | Department of Energy  

Energy Savers [EERE]

Communication Consultant Contract Communication Consultant Contract Communication Consultant Contract, from the Tool Kit Framework: Small Town University Energy Program (STEP). B4d...

187

A Longitudinal Analysis of the Impact of Firm Resources and Industry Characteristics on Firm-Specific Profitability  

E-Print Network [OSTI]

Using a dynamic heterogeneous panel data model, we examine the relationship between firm-specific resources (corporate management capabilities, employee value-added and technological competence) and firm-specific profitability ...

Acquaah, Moses; Chi, Tailan

2007-01-01T23:59:59.000Z

188

Historical Average Priority Firm Power Rates (rates/previous)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinement plasmas in theinPlasticsreduction .HistoricHistorical Average

189

Appointment of Contracting Officers and Contracting Officer's Representatives  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish procedures governing the selection, appointment, and termination of contracting officers and for the appointment of contracting officer's representatives. To ensure that only trained and qualified procurement and financial assistance professionals, within the scope of this Order, serve as contracting officers. Cancels DOE O 541.1. Canceled by DOE O 541.1B.

2000-10-27T23:59:59.000Z

190

SF 6432-FP Standard Terms and Conditions for Firm Fixed-price Contracts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromisingStoriesSANDIA REPORT SANDSDN forAA7/31/13 Page 1 of

191

Jefferson Lab Awards $3.54 Million Contract To Pennsylvania Firm for 12 GeV  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfraredJefferson Lab Click on theJames D.Announces Two FallCompany

192

Jefferson Lab awards $7.3 million construction contract to Chesapeake firm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFunInfraredJefferson Lab Click onLaserLabLab To|beginFallTheof an|

193

Considerations When Using Grain Contracts  

E-Print Network [OSTI]

Grain contracts can help farmers manage the increasing risks of production and the price volatility of the market. This publication explains grain contracts and how to use them wisely as a risk management tool....

Wisner, Robert; McCorkle, Dean

2000-04-07T23:59:59.000Z

194

Energy Savings Performance Contracting Webinars  

Broader source: Energy.gov [DOE]

Provides a listing of past Energy Savings Performance Contracting webinars and associated files. Author: U. S Department of Energy

195

Contracting with Oak Ridge National  

E-Print Network [OSTI]

Contracting with Oak Ridge National Laboratory Presented at the 5nd Annual East Tennessee Veterans our web site for Upcoming Subcontracting Opportunities at www.ornl.gov/adm/contracts/majorprocs.pdf · Register your business in Supplier Information Database at www.ornl.gov/adm/contracts/supplierportal. shtml

196

Bonneville Power Administration Overview As of December 1, 2014  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

80% of BPA's total firm power supply is carbon emission-free hydroelectric power * BPA's grid provides about 75% of the bulk transmission capacity in the Region Bonneville Power...

197

Industrial Energy Procurement Contracts  

E-Print Network [OSTI]

court, on the theory of promissory estoppel. The issuer of the RFP was estopped or prohibited from reneging on his promise, once the bidder had relied on it. 13 This set of facts may seem far-fetched, but the real lesson here is, where big money...: Pricing, Contracting, and Negotiating, American Management Conference. 4 Kay Moxness at Central Lincoln People's Utility District at 541-574-2004, krnoxness@cencoast.com and http://www.clpud.com/;)enny Boardman at Corporate Communications...

Thompson, P.; Cooney, K.

198

Accelerating Energy Savings Performance Contracting Through Model...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Accelerating Energy Savings Performance Contracting Through Model Statewide Programs Accelerating Energy Savings Performance Contracting Through Model Statewide Programs Provides...

199

Contract Provisions and Ratchets: Utility Security or Customer Equity?  

E-Print Network [OSTI]

CONTRACT PROVISIONS ANO RATCHETS: UTILITY SECURITY OR CUSTOMER EQUITY? BARBARA A. PENKALA Senior Research Analyst Houston Lighting & Power Company Houston. Texas ABSTRACT The contract provisions and ratchets con tained in an electric... of customers and the magnitude of the load served. A smaller part of the cost is dependent on kilowatt-hours. or energy supplied. The high investment required in the electric utility business relative to annual revenue has an important influence on price...

Penkala, B. A.

200

Contract-Open ITT Invitation to Tender  

E-Print Network [OSTI]

Contract-Open ITT Invitation to Tender for Waste Management West England Forest District & The National Arboretum at Westonbirt Contract No: 317/R01/13 #12;Contract-Open ITT 6e. Contract-Open ITT | 2 on our website at www.forestry.gov.uk 1 Type and term of contract We will be awarding a contract

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Contract-Open ITT Invitation to Tender  

E-Print Network [OSTI]

Contract-Open ITT Invitation to Tender for Toilet, kitchen and office space cleaning at Westonbirt Arboretum 2012 ­ 2015 Contract No: FC/WE/CLEAN/12-15 #12;Contract-Open ITT 6e. Contract-Open ITT | 2 on our website at www.forestry.gov.uk 1 Type and term of contract We will be awarding a contract

202

CONTRACT ROUTING FORM LOUISIANA TECH UNIVERSITY  

E-Print Network [OSTI]

CONTRACT ROUTING FORM LOUISIANA TECH UNIVERSITY This form is designed for use in routing contracts Services Contracts or contracts administered through the Office of University Research. Name of Person initiating the Routing Process Name of Department Other Party (on contract) Purpose of contract or work

Selmic, Sandra

203

Contract-Open ITT Invitation to Tender  

E-Print Network [OSTI]

Contract-Open ITT Invitation to Tender for Plant Health Inspection and Survey Programmes in Great Britain Contract No: CP/PH(GB)01/2012 #12;Contract-Open ITT 6e. Contract-Open ITT | 2 | Version 1 02.forestry.gov.uk 1 Type and term of contract We will be awarding a contract for the provision of a plant health

204

Method of contractions in Clifford algebras  

E-Print Network [OSTI]

In this paper we consider some expressions (sums) in Clifford algebras which we call contractions or averaging. We study full contractions, contractions by adjoint sets of multi-indices, simple contractions. We present the relation between simple contractions and projection operations onto fixed subspaces of Clifford algebras. Using method of contractions we present solutions of system of commutator equations.

D. S. Shirokov

2014-11-30T23:59:59.000Z

205

Contract-Open ITT Invitation to Tender  

E-Print Network [OSTI]

Contract-Open ITT Invitation to Tender for Deer Culling ­ Tay Forest District Tender No: FM11/504/31 #12;Contract-Open ITT 6e. Contract-Open ITT | 2 | Version 31/8/11 Introduction The Forestry Commission of contract We will be awarding a contract for Deer Culling. The contract areas will cover several Deer

206

Contract-Open ITT Invitation to Tender  

E-Print Network [OSTI]

Contract-Open ITT Invitation to Tender for Deer Culling ­ Tay Forest District Tender No: FM11/504/32 #12;Contract-Open ITT 6e. Contract-Open ITT | 2 | Version 31/8/11 Introduction The Forestry Commission of contract We will be awarding a contract for Deer Culling. The contract areas will cover several Deer

207

Contract-Open ITT Invitation to Tender  

E-Print Network [OSTI]

Contract-Open ITT Invitation to Tender for Weed Control West England District West Beat Contract No: 317/016/12 OJEU Ref: #12;Contract-Open ITT 6e. Contract-Open ITT | 2 | Version 1 03/11 Introduction.forestry.gov.uk 1 Type and term of contract We will be awarding a contract for the supply of Chemical Weed Control

208

The small firm enters international trade  

E-Print Network [OSTI]

be & ditcd for ~ 6] information of benefit to the, smaller fir?& engaged i;& internationai trade. ~ The Small Business Adm inis Lrat ion ' s Fx~&&rt Marl' . t ', n n' for S. &ai 3 cr &'3 rms- provides a discussion of i oreigr I 3P] market analysis... for the small business firm and is useful in this field. However, this book does not cover the foreign cultux al environment, which may be the decisive factor in marketing, and provides no information con- cerning shipp. ', ng and finance. Many trade...

Steelquist, Laura McDowell

1973-01-01T23:59:59.000Z

209

Exporting licensing regulations affecting US geothermal firms  

SciTech Connect (OSTI)

This document presents a brief introduction and overview of the Department of Commerce's Export Administration Regulations which might affect potential US geothermal goods exporters. It is intended to make US geothermal firms officials aware of the existence of such regulations and to provide them with references, contacts and phone numbers where they can obtain specific and detailed information and assistance. It must be stressed however, that the ultimate responsibility for complying with the above mentioned regulations lies with the exporter who must consult the complete version of the regulations.

Not Available

1988-08-01T23:59:59.000Z

210

Contract Pricing Proposal Cover Sheet UT-B Contracts Div Page 1 of 1  

E-Print Network [OSTI]

Contract Pricing Proposal Cover Sheet UT-B Contracts Div Mar 2006 Page 1 of 1 contract-price-prop-cover-ext-venx-mar06.doc CONTRACT PRICING PROPOSAL COVER SHEET 1. SOLICITATION /CONTRACT/MODIFICATION NUMBER 2a. NAME'S POINT OF CONTACT AREA CODE NUMBER 4. TYPE OF CONTRACT ACTION (Check)2c. STREET ADDRESS a. NEW CONTRACT c

Pennycook, Steve

211

Organizational Learning and Internationalization Knowledge: A Comparative Study of Family Firms and Non-Family Firms  

E-Print Network [OSTI]

1 Organizational Learning and Internationalization Knowledge: A Comparative Study of Family Firms's internationalization as a process of organizational learning is becoming frequent (Eriksson et al, 2000; Eriksson and organizational learning is deemed to underlie the process of resource commitment and more generally

Boyer, Edmond

212

Contract | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User GroupInformationE-Gov ContactsContract Management SLAC

213

Contract | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User GroupInformationE-Gov ContactsContract Management SLACContract

214

Prime Contracts - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home DesignPresentations Presentations926 2.804 2.705 2.197Contract

215

Essays on the Performance of Manufacturing Firms in Developing Countries  

E-Print Network [OSTI]

firms were aware of preventive maintenance but few of themSpecific practice Preventive maintenance is carried outfor the machines Preventive maintenance is carried out per

Eifert, Benjamin Patrick

2010-01-01T23:59:59.000Z

216

Y-12 cleaning technology licensed by Knoxville engineering firm...  

National Nuclear Security Administration (NNSA)

cleaning technology licensed by Knoxville engineering firm | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile...

217

Utility Energy Savings Contract Project  

Broader source: Energy.gov [DOE]

Presentation covers the Utility Energy Savings Contract Project and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

218

Revised Nov. 2013 Contracting and Procurement Services  

E-Print Network [OSTI]

Revised Nov. 2013 Contracting and Procurement Services Contract and Purchase Order Cover Sheet Procedures The Contract and Purchase Order Cover Sheet is an internal document utilized by Contracting the business purpose of the proposed purchase or contract; 2) Identify courses offered for credit at off campus

Caughman, John

219

11. CONTRACT ID CODE IPAG~ OF PAGES  

E-Print Network [OSTI]

11. CONTRACT ID CODE IPAG~ OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I 2 2. MODIFICATION OF CONTRACT/ ORDER NO. DUNS # 032987476 DE-AC05-76RL01830l8l 10B. DATED (SEE ITEM 13) CODE ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14

220

CONTRACT ADVISORY Updated October 25, 2013  

E-Print Network [OSTI]

CONTRACT ADVISORY Updated October 25, 2013 RELATING TO CONTRACT BETWEEN UNC CHARLOTTE AND IF (A/UNIT/SCHOOL/COLLEGE INITIATING THIS CONTRACT, AND (B) YOU HAVE ASSESSED THE RISKS INVOLVED IN AGREEING TO THE CONTRACT CLAUSES MARKED BELOW, AND (C) YOU CHOOSE TO APPLY THE CONTRACT ADVISORY PROCESS, THEN YOU ARE AUTHORIZED TO SIGN

Howitt, Ivan

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Types of Utility Energy Service Contracts  

Broader source: Energy.gov [DOE]

Several types of contracts are used as utility energy service contracts (UESCs). Many agency sites procure electricity services under a contract with the local utility, and most of these contracts have provisions that can also cover energy efficiency projects. Agencies not covered by such agreements may enter contracts with the utility for the sole purpose of implementing energy projects.

222

Innovative Contracting Strategies forInnovative Contracting Strategies for Transportation MaintenanceTransportation Maintenancepp  

E-Print Network [OSTI]

Innovative Contracting Strategies forInnovative Contracting Strategies for TransportationResearch Methodology Research Findings and DeliverablesResearch Findings and Deliverables Maintenance Contracting Strategy Selection Framework Maintenance Contracting Strategy Selection Guide Case St dies on Inno ati e

Texas at Austin, University of

223

Contract Signature Using Quantum Information  

E-Print Network [OSTI]

This paper describes how to perform contract signature in a fair way using quantum information. The protocol proposed permits two partners, users of a communication network, to perform a contract signature based on the RSA security. The authentication of the signers is based on the use of a non-local XOR function of two classical bits.

Paulo Benicio Melo de Sousa; Rubens Viana Ramos

2007-11-08T23:59:59.000Z

224

Pricing and Firm Conduct in California's Deregulated Electricity Market  

E-Print Network [OSTI]

sector to competitive forces by restructuring the method of procuring electricity. Private electricPWP-080 Pricing and Firm Conduct in California's Deregulated Electricity Market Steven L. Puller.ucei.berkeley.edu/ucei #12;Pricing and Firm Conduct in California's Deregulated Electricity Market Steven L. Puller August

California at Berkeley. University of

225

Contract Management Plan Outline | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract

226

11. CONTRACT 10 CODE OF PAGESIPAGE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network [OSTI]

11. CONTRACT 10 CODE OF PAGESIPAGE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1 2 2 ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. D B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED

227

Contracts and Procurement eBusiness Programs  

E-Print Network [OSTI]

Contracts and Procurement eBusiness Programs Department Pcard Application Use this form Return the completed application to Contracts and Procurement, CP300. Contact pcard@fullerton.edu with any questions. Contracts and Procurement Use Only Processed by: Card #: Process

de Lijser, Peter

228

The Contracting State and Its Courts  

E-Print Network [OSTI]

2005. Andreas Abegg The Contracting State and its Courts VONPT T T T Andreas Abegg The Contracting State and its Courts49. Andreas Abegg The Contracting State and its Courts A.

Abegg, Andreas

2009-01-01T23:59:59.000Z

229

Contracts and Procurement eBusiness Programs  

E-Print Network [OSTI]

Contracts and Procurement eBusiness Programs Procurement Card Revision Request Use this form Date Contracts and Procurement Use Only Completed by: Pcard #: Completed Date: Return completed form to: Contracts and Procurement, CP300

de Lijser, Peter

230

Does Contracting Transit Service Save Money?  

E-Print Network [OSTI]

wage rates. In some cases contracting for service may be theby other strategies. Contracting is a viable option for manye y e r , Privatization Contracting, p p . 1 -11, 1 9 8 7 .

McCullough, William S.; Taylor, Brian D.; Wachs, Martin

1997-01-01T23:59:59.000Z

231

Optimal Property Rights in Financial Contracting  

E-Print Network [OSTI]

J. L. Westbrook (2005) “Contracting Out of Bankruptcy: Anby monitoring the ?rm’s contracting with the later lender isRents and the Competitive Contracting Process”, Journal of

Ayotte, Kenneth M.; Bolton, Patrick

2007-01-01T23:59:59.000Z

232

Contracts and Procurement eBusiness Programs  

E-Print Network [OSTI]

Contracts and Procurement eBusiness Programs OfficeMax Revision Request Use this form to make or Designee Print Name Title Signature Date Contracts: Contracts and Procurement, CP300 Please contact officemax

de Lijser, Peter

233

Contracts as a Risk Management Tool  

E-Print Network [OSTI]

About one-third of the total value of U.S. agricultural production is produced under contract arrangements. This publication explains marketing and production contracts, and gives specific detail about contracts in swine production...

Hall, Charles R.; Langemeier, Larry N.

1999-04-15T23:59:59.000Z

234

DOE/NNSA Facility Management Contracts  

Office of Environmental Management (EM)

NNSA Facility Management Contracts March 2015 version Facility Owner Contractor Award Date End Date OptionsAward Term Ultimate Potential Expiration Date Contract FY Competed...

235

UESC Contracting Officer Issues Round-Up  

Broader source: Energy.gov (indexed) [DOE]

OCTOBER 17, 2012 Presented by: Alice Oberhausen Former DoD Contracting Officer UESC PROCESSES - CONTRACTING OFFICER LINGERING QUESTIONS * With so much legislation surrounding the...

236

Report: President's Energy Efficiency Contracting for Federal...  

Broader source: Energy.gov (indexed) [DOE]

Report: President's Energy Efficiency Contracting for Federal Buildings a Success Report: President's Energy Efficiency Contracting for Federal Buildings a Success January 8, 2014...

237

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

for performance of the contract or subcontract. (c) The offeror, upon request by the Contracting Officer, shall submit and negotiate a subcontracting plan, where applicable, that...

238

Federal Contracting Officers Guidebook | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Contracting Officers Guidebook Federal Contracting Officers Guidebook Presentation-given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting-provides...

239

Utility Energy Services Contracts: Enabling Documents  

Broader source: Energy.gov (indexed) [DOE]

9, 2000, Richard Butterworth, GSA - authorized to enter contracts for terms greater than ten years * Relationship of the Anti-Deficiency Act to Multi- year Contracts June 22,...

240

Department of Energy - Voluntary Protection Program Contract...  

Office of Environmental Management (EM)

Contract Transition Process Department of Energy - Voluntary Protection Program Contract Transition Process The purpose of the Department of Energy (DOE) Voluntary Protection...

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT...  

National Nuclear Security Administration (NNSA)

Previous edition unusable 15C. DATE SIGNED i t '1( 3 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Cntisnu ft l I 16C. DATE SIGNED Prescribed by GSA FAR (48...

242

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT...  

National Nuclear Security Administration (NNSA)

3 - Encl. Attachment I Fee Schedule Cy: Thomas H. Nugent, Wells Fargo Bank, N.A. Contracting Officer, The United States of America Department of Energy Charlie McMillan, DIR,...

243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT...  

National Nuclear Security Administration (NNSA)

SIGNED lt.ZPzorz.. STANDARD FORM 30 (REV. 10-83) temp03.dot Prescribed by GSA FAR (48 CFR) 53.243 Los Alamos National Security, LLC Contract No. DE-AC52-06NA25396 Modification...

244

Microsoft PowerPoint - 2008-12-16_DSI-Workshop v3.ppt  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of any firm power made available by the reduction of another direct-service industry smelter customer's entitlement pursuant to a corresponding section of such other customer's...

245

Master Regional Dilaogue Contract Template  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

contains the clauses and contract structure that will be used in the following templates: Load Following, Block, SliceBlock, RPSA, and DSI. It does not contain clauses that are...

246

Effective contracts in supply chains  

E-Print Network [OSTI]

In the past decade, we have seen significant increase in the level of outsourcing in many industries. This increase in the level of outsourcing increases the importance of implementing effective contracts in supply chains. ...

Shum, Wanhang

2007-01-01T23:59:59.000Z

247

Avoiding and Managing Interruptions of Electric Service Under an Interruptible Contract or Tariff  

E-Print Network [OSTI]

Many large industrial consumers of electricity purchase power through special interruptible contracts or curtailable tariffs. Historically, the number of actual interruptions has been very small -many interruptible consumers have never been required...

Evans, G. W.

248

WICT PROCEEDINGS, DECEMBER 2008 1 Conflict Analysis of Deontic Contracts  

E-Print Network [OSTI]

with different con- tracts, and the combination of service contracts with local contracts can give rise

Pace, Gordon J.

249

Rev. 7-21-14 CONTRACTING SERVICES  

E-Print Network [OSTI]

Rev. 7-21-14 CONTRACTING SERVICES I. WHAT CAN CONTRACTING SERVICES DO FOR YOU? Negotiating Drafting Attorney General and Controller II. SIGNATURE DELEGATION The University's authority to enter into contracts memorandums delegating signature authority are available on the Contracting Services web page. Expenditure

250

Contract-Open ITT Invitation to Tender  

E-Print Network [OSTI]

Contract-Open ITT Invitation to Tender for Haulage of Round Timber, Southern England Contract No information is available on our website at www.forestry.gov.uk 1 Type and term of contract We will be awarding a contract for the haulage of round timber from FC land in the south of England to Norbord, South Molton

251

Rev. 8-1-2012 CONTRACTING SERVICES  

E-Print Network [OSTI]

Rev. 8-1-2012 CONTRACTING SERVICES I. WHAT CAN CONTRACTING SERVICES DO FOR YOU? Negotiating into contracts is derived (by statute) from the Board of Governors and delegated to the President in December 2010. Current memorandums delegating signature authority are available on the Contracting Services

252

Advantages of a Leveled Commitment Contracting Protocol  

E-Print Network [OSTI]

Advantages of a Leveled Commitment Contracting Protocol Tuomas W. Sandholm and Victor R. Lesser 7, 1995 #12; Advantages of a Leveled Commitment Contracting Protocol Tuomas W. Sandholm and Victor R, contracts have traditionally been binding. Such contracts do not al­ low agents to efficiently accommodate

Massachusetts at Amherst, University of

253

Resources on Implementing Energy Savings Performance Contracts  

Broader source: Energy.gov [DOE]

Many resources are available to help Federal agencies implement energy savings performance contracts (ESPCs).

254

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid

255

Goal Orientation as Shaping the Firm's Entrepreneurial Orientation and Performance  

E-Print Network [OSTI]

Firms’ top decision makers cannot possibly know what decisions to make. Rather, decision makers must interpret their situations and make the best possible decision based upon their interpretation of their situations. In this dissertation, I examine...

Webb, Justin W.

2011-02-22T23:59:59.000Z

256

Indirect Learning: How Emerging- Market Firms Grow in Developed Markets  

E-Print Network [OSTI]

-market competitors such as Nokia- Siemens Networks (operating in China). Drawing on these arguments, we hypothesize the following: H2a: Emerging-market firms that have greater exposure to developed-market competitors in their domestic market exhibit greater...

Banerjee, Sourindra; Prabhu, Jaideep C.; Chandy, Rajesh K.

2015-01-01T23:59:59.000Z

257

Application of lean enterprise concept to construction firms in Japan  

E-Print Network [OSTI]

Construction firms in Japan are struggling with the change in construction industry environment and need a new business model to meet the change. On the other hand, Japanese manufacturing companies, especially automobile ...

Taguchi, Hiroshi, 1973-

2004-01-01T23:59:59.000Z

258

The influence of institutional investors on firm value  

E-Print Network [OSTI]

The impact of corporate governance on firm value has been extensively debated by academics and business practitioners. Some studies show that companies that allow minority shareholders to have more control are likely to ...

Lee, Yong Seung

2013-01-01T23:59:59.000Z

259

Green Buildings: Construction Design Firms' Implementation of Sustainable Design Standards  

E-Print Network [OSTI]

This paper is written to show the importance of green buildings and therefore the need for sustainable design. The paper describes why a construction design firm must take the steps necessary to properly integrate these sustainable design standards...

Malone, Nathan

2008-12-19T23:59:59.000Z

260

Factors affecting the selling prices of small firms  

E-Print Network [OSTI]

58 percent of the jobs in the United Stated are created by firms with fewer than 500 employees (Davis, et al. [1998]). Yet, there is only limited research done on the industry trends and conditions affecting small company ...

Somervuo, Timo J. (Timo Juhani)

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

angliiskije firm vrutsja: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

choice of ... Xue, Yanfeng 2004-02-13 63 The Nature of the Firm and Peculiarities of the Corporation University of Cambridge - Dspace Summary: at all in a specialised exchange...

262

Overseas projects finance by international institutions for Japanese construction firms  

E-Print Network [OSTI]

This thesis analyzes the relationships between Japanese construction firms, and overseas projects financed by international institutions, such as the World Bank Group, United Nations, ADB, IDB, JBIC, and JICA. Japanese ...

Kojima, Masashi, 1968-

2004-01-01T23:59:59.000Z

263

Risk warehousing within insurance firms and the role of securitization  

E-Print Network [OSTI]

Insurance firms perform two key economic functions. First, they intermediate risk by marketing, selling and administering insurance policies. Second, they warehouse the risks underlying those policies. If viewed as separate ...

Strydom, Johann J. (Johann Jurie)

2011-01-01T23:59:59.000Z

264

Proposal to Negotiate Amendments to an Existing Contract for the Supply of the Cold Masses of the LHC Short Straight Sections  

E-Print Network [OSTI]

This document concerns the proposal to negotiate amendments to an existing contract for the supply of the main superconducting quadrupoles and assembly of the cold masses of the LHC short straight sections. For the reasons explained in this document, the Finance Committee is invited to approve amendments to the existing contract for the supply of the main superconducting quadrupoles and assembly of the cold masses of the LHC short straight sections with the firm ACCEL INSTRUMENTS (DE) for an amount exceeding the previously approved amount by up to 5 350 951 euros (8 561 522 Swiss francs), subject to revision, bringing the total contract amount to a maximum amount of 36 135 587 euros (58 020 122 Swiss francs), subject to revision. The rate of exchange used is that stipulated in the initial tender (CERN/FC/4253). The firm has declared the following origin of the equipment covered by this adjudication proposal: DE - 100%.

2003-01-01T23:59:59.000Z

265

Proposal to negotiate an amendment to an existing contract for the supply and installation of pipelines for the LHC accelerator tunnel  

E-Print Network [OSTI]

This document concerns the proposal to negotiate an amendment to an existing contract for the supply and installation of pipelines for the LHC accelerator tunnel. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to the existing contract for the supply and installation of pipelines for the LHC accelerator tunnel with the firm RENCO (IT) for an amount exceeding the previously approved amount of 21 995 304 Swiss francs by up to 5 000 000 Swiss francs, not subject to revision, bringing the total contract amount to a maximum amount of 26 995 304 Swiss francs, not subject to revision. The firm has declared the following origin of the equipment covered by this adjudication proposal: IT - 100%.

2003-01-01T23:59:59.000Z

266

Optimality-based Bound Contraction with Multiparametric Disaggregation for the Global  

E-Print Network [OSTI]

. The global optimization of mixed-integer nonlinear problem (P) is important in areas such as power systems unit commitment problem [19], which is a quadratic function of power; (ii) the power output in hydro1 Optimality-based Bound Contraction with Multiparametric Disaggregation for the Global

Grossmann, Ignacio E.

267

1. CONTRACT ID CODE PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network [OSTI]

3 1. CONTRACT ID CODE PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 2. MODIFICATION OF CONTRACT! ORDeR NO. DE-AC05-76RL01830 .. DUNS # 032987476 ~ 10B. DATED (SEE ITEM 13) CODE ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14

268

Contract for Consultancy Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Consultancy Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of CONSULTANCY SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 The Contract Commencement

269

Contract for Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of SERVICES (NON OPERATIONS) between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 [The Contract Commencement

270

Contract for Consultancy Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Consultancy Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of CONSULTANCY SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 [The Contract Commencement

271

Contract for Harvesting Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Harvesting Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of HARVESTING SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 [The Contract Commencement

272

Contract for Harvesting Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Harvesting Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of HARVESTING SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 The Contract Commencement

273

11. CONTRACT 10 CODE OF PAGESIPAGE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network [OSTI]

11. CONTRACT 10 CODE OF PAGESIPAGE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1 7 2 ONLY 10 MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A D B. THE ABOVE NUMBERED CONTRACTIORDER IS MODIFIED

274

\\1. CONTRACT ID CODE I PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network [OSTI]

\\1. CONTRACT ID CODE I PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1 1 2 ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14 IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. D B. THE ABOVE NUMBERED CONTRACTIORDER

275

\\1. CONTRACT ID CODE OF PAGES-I PAGE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

E-Print Network [OSTI]

\\1. CONTRACT ID CODE OF PAGES-I PAGE AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 I 3 3. MODIFICATION OF CONTRACT/ ORDER NO. DE-AC05-76RLO1830 DUNS # 032987476 ~ 108. DATED (SEE /TEM 13) CODE FACILITY ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14

276

Contract for Haulage Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Haulage Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of HAULAGE SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 [The Contract Commencement

277

Contract for Operational Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Operational Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of SERVICES (OPERATIONAL) between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 The Contract Commencement

278

Contract for Haulage Services (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Haulage Services (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of HAULAGE SERVICES between The Forestry to the Commission in accordance with and subject to the provisions of this Contract. 2 The Contract Commencement

279

Enclosure 3 INSTRUCTIONS TO CONTRACTING OFFICERS: The special contract requirement "Workers Compensation  

E-Print Network [OSTI]

10 Enclosure 3 INSTRUCTIONS TO CONTRACTING OFFICERS: The special contract requirement "Workers Compensation Insurance (Defense Base Act) (April 2011)" shall be included in the contract as applicable. Whenever Defense Base Act (DBA) insurance is required under the contract, the following special contract

US Army Corps of Engineers

280

Exemption from Application of the Service Contract Act -Certification UT-B Contracts Div Certain Services  

E-Print Network [OSTI]

Exemption from Application of the Service Contract Act - Certification UT-B Contracts Div Certain OF THE SERVICE CONTRACT ACT ­ CERTAIN SERVICES ­ CERTIFICATION (Jan 2008) (a) The offeror shall check that the Service Contract Act ­ (1) Will not apply to this offeror, then the applicable Service Contract Act

Pennycook, Steve

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

NUCLEAR POWER in CALIFORNIA  

E-Print Network [OSTI]

NUCLEAR POWER in CALIFORNIA: 2007 STATUS REPORT CALIFORNIA ENERGY COMMISSION October 2007 CEC-100, California Contract No. 700-05-002 Prepared For: California Energy Commission Barbara Byron, Senior Nuclear public workshops on nuclear power. The Integrated Energy Policy Report Committee, led by Commissioners

282

QA Standard Contract Language  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 | DepartmentLoans | Department of Energy Q&A:The

283

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy

284

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergyFirst Quarter

285

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergyFirst

286

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergyFirstThird Quarter

287

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergyFirstThird

288

Contract/Project Management  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergyFirstThirdFirst

289

EM Utility Contracts  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResources DOE ZeroThreeEnergyDepartment0: DOE512:Shines with Five DOE One2/2012

290

Proposal for the Award of Two Contracts for the Supply of High Temperature SuperconductingTape for the LHC  

E-Print Network [OSTI]

This document concerns the award of two contracts for the supply of high temperature superconducting (HTS) BSCCO 2223 Ag-Au tape, of two different types, for the LHC. Following a call for tenders (IT-3143/AT/LHC) sent on 5 March 2003 to four firms in two Member States and one firm in the US, CERN received one tender from a firm in a Member State and one tender from the firm in the United States. The Finance Committee is invited to agree to the negotiation of contracts with: - VACUUMSCHMELZE (DE), for the supply of 17 km of HTS BSCCO 2223 Ag-Au tape with Ic > 66 A at 77 K for a total amount of 807 833 euros (1 201 900 Swiss francs), not subject to revision, with an option for the supply of up to additional 17 km of HTS BSCCO 2223 Ag-Au tape, for a total amount of up to 807 833 euros (1 201 900 Swiss francs), not subject to revision, bringing the total amount to a maximum of 1 615 666 euros (2 403 800 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender.

2003-01-01T23:59:59.000Z

291

Contract No. DE-AC02-09CH11466 CONTRACT CLAUSES  

E-Print Network [OSTI]

Contract No. DE-AC02-09CH11466 Section I M152 I-i PART II SECTION I CONTRACT CLAUSES TABLE THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACT

Princeton Plasma Physics Laboratory

292

Contract Research | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User GroupInformationE-Gov ContactsContract Management SLAC Contract

293

AMENDMENT OF SOUCITATIONIMODIFICATION OF CONTRACT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience4AJ01) (See95TI07)Operations2 Print258 PrintSOLI CONTRACT 11. CONTRACT

294

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT...  

National Nuclear Security Administration (NNSA)

in full force and effect 15A. pArD DE 1Type or plint) * * 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print) vf- J..,b ()1ve,. cfi' 15C. DATE SIGNED 16C. DATE...

295

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT...  

National Nuclear Security Administration (NNSA)

IZ, zP u>ll 30-105 STANDARD FORM 30 (REV. 10-83) temp03.dot Prescribed by GSA FAR (48 CFR) 53.243 Los Alamos National Security, LLC Contract No. DE-AC52-06NA25396 Modification...

296

Proposal for the Award of a Blanket Contract for theSupply of Multi-Core Signalling and Data-Transmission Cables for the LHC  

E-Print Network [OSTI]

This document concerns the award of a blanket contract for the supply of multi-core signalling and data-transmission cables for the LHC. Following a market survey carried out among 55 firms in fifteen Member States, a call for tenders (IT-3128/SPL) was sent on 5 March 2003 to 15 firms in five Member States. By the closing date, CERN had received seven tenders from seven firms in three Member States. The Finance Committee is invited to agree to the negotiation of a blanket contract with DRAKA MULTIMEDIA CABLE (DE), the lowest bidder, for the supply of multi-core signalling and data-transmission cables for a total amount not exceeding 895 000 euros (1 300 000 Swiss francs) subject to revision according to London Metal Exchange (LME) copper prices. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: DE - 100%.

2003-01-01T23:59:59.000Z

297

Proposal for the award of a contract for the supply and installation of a double-loop fluorocarbon cooling plant for CMS  

E-Print Network [OSTI]

This document concerns the award of a contract for the supply and installation of a double-loop fluorocarbon cooling plant for the CMS tracker and preshower detectors. Following a market survey carried out among 48 firms in eighteen Member States, a call for tenders (IT-3230/TS/CMS) was sent on 5 January 2004 to four firms and one consortium in two Member States. By the closing date, CERN had received two tenders from one firm and one consortium in two Member States. The Finance Committee is invited to agree to the negotiation of a contract with DATE (FR), the lowest bidder, for the supply and installation of a double- loop fluorocarbon cooling plant for the CMS tracker and preshower detectors for a total amount of 2 183 578 euros (3 397 666 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in the tender. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: FR - 100%.

2004-01-01T23:59:59.000Z

298

Ris-R-1441 (EN) Power System Models  

E-Print Network [OSTI]

. Wilmar is an abbreviation of "Wind Power Integration in Liberalised Electricity Markets". The project publication from the project. WILMAR - WIND POWER INTEGRATION IN A LIBERALISED ELECTRICITY MARKET CONTRACT No "Wind Power Integration in L

299

Contraction semigroups on metric graphs  

E-Print Network [OSTI]

The main objective of the present work is to study contraction semigroups generated by Laplace operators on metric graphs, which are not necessarily self-adjoint. We prove criteria for such semigroups to be continuity and positivity preserving. Also we provide a characterization of generators of Feller semigroups on metric graphs.

Vadim Kostrykin; Jurgen Potthoff; Robert Schrader

2008-02-26T23:59:59.000Z

300

WUSM RA Forum Grants & Contracts  

E-Print Network [OSTI]

1 WUSM RA Forum March 2006 Grants & Contracts #12;2 NIH Update #12;3 Beginning February 1, 2006, National Institute of Health (NIH) will stop sending summary statements and Peer Review Outcome letter NIH eRA Commons #12;4 Advantages to Registering in the NIH eRA Commons: · The NIH eRA Commons

Kroll, Kristen L.

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

POLICY SUMMARY BUSINESS ASSOCIATE CONTRACTS  

E-Print Network [OSTI]

POLICY SUMMARY BUSINESS ASSOCIATE CONTRACTS POLICY NUMBER 2003-04 To comply with HIPAA requirements PRIVACY AND SECURITY POLICY NUMBER 2003-07 To identify the mechanism by which appropriate staff receives policies related to security and privacy of protected health information. BREACHES OF PRIVACY & SECURITY

Oliver, Douglas L.

302

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Services & Testing Contract September 2014 Contractor: Contract Number: Contract Type: Advanced Technologies & Labs International Inc. DE-AC27-10RV15051 Cost Plus Award Fee...

303

Performance Contracting and Energy Efficiency in the State Government Market  

E-Print Network [OSTI]

s Energy Performance Contracting Program,” prepared forAugust 6. Perform ance Contracting and Energy Efficiency inL ABORATORY Performance Contracting and Energy Efficiency in

Bharvirkar, Ranjit

2008-01-01T23:59:59.000Z

304

Before the House Small Business Subcommittee on Contracting and...  

Broader source: Energy.gov (indexed) [DOE]

Subcommittee on Contracting and Technology Before the House Small Business Subcommittee on Contracting and Technology Before the House Small Business Subcommittee on Contracting...

305

Washington Success Story-A Performance Contracting Program |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Success Story-A Performance Contracting Program Washington Success Story-A Performance Contracting Program Provides an overview case study of Washington's Performance Contracting...

306

Contracting For Public Transit Services: Evaluating the Tradeoffs  

E-Print Network [OSTI]

Research Iseki, Hiroyuki. Does Contracting Matter?The Determinants of Contractingand Contracting’s Effects on Cost Efficiency in U.S. Fixed-

Frick, Karen Trapenberg; Taylor, Brian; Wachs, Martin

2008-01-01T23:59:59.000Z

307

Hawaii Success Story-A Performance Contracting Program | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hawaii Success Story-A Performance Contracting Program Hawaii Success Story-A Performance Contracting Program Provides an overview case study of Hawaii's Performance Contracting...

308

Ask the Expert: Energy Savings Performance Contracting | Department...  

Broader source: Energy.gov (indexed) [DOE]

Ask the Expert: Energy Savings Performance Contracting Ask the Expert: Energy Savings Performance Contracting Ask the Expert: Energy Savings Performance Contracting Ask The Expert...

309

Contracting and litigation under biases and asymmetric information  

E-Print Network [OSTI]

OF THE DISSERTATION Contracting and Litigation Under Biasesand David Thesmar, “Financial Contracting with Opti- misticAl- ways Enforce What Contracting Parties Write? ” Penn

Hovander, Elisa Wynne Kirsten

2011-01-01T23:59:59.000Z

310

Utah Success Story-A Performance Contracting Program | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Utah Success Story-A Performance Contracting Program Utah Success Story-A Performance Contracting Program Provides an overview case study of Utah's Performance Contracting Program....

311

University of Pittsburgh SUMMER TERM HOUSING/FOOD SERVICES CONTRACT  

E-Print Network [OSTI]

1 University of Pittsburgh SUMMER TERM HOUSING/FOOD SERVICES CONTRACT/Food Services Contract (this "Contract") is made by and between the University of Pittsburgh

Sibille, Etienne

312

M & O Contract Recompete Site -- Home Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FedBizOpps December 14,2011:RFP for Single Management and Operating Contract (weblink) New July 21, 2011: PRESOLICITATION - Draft RFP for Single Management and Operating Contract...

313

Contracts and Procurement Procurement Card Program  

E-Print Network [OSTI]

Contracts and Procurement Procurement Card Program Rev 6/23/11 PROCUREMENT CARD ONLINE TRAINING will receive notification when your Procurement Card is available for pickup. Contracts and Procurement Use

de Lijser, Peter

314

Applications for Certification (Contracting) | Department of...  

Office of Environmental Management (EM)

Contracting) Applications for Certification (Contracting) Application FAC-C Level I.pdf Application FAC-C Level II.pdf Application FAC-C Level III.pdf More Documents & Publications...

315

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

small business will be submitted and negotiated each year upon request by the Contracting Officer within the time Attachment to Modification M209 B&W Pantex Contract No....

316

Performance Contracting for Public Sector Improvement Projects  

E-Print Network [OSTI]

Johnson Controls Building Efficiency | Solutions A.Denise Malloy Solutions Account Executive December 18, 2013 Alternative Financing for Energy Efficiency Performance Contracting ESL-KT-13-12-41 CATEE 2013: Clean Air Through Energy Efficiency... Conference, San Antonio, Texas Dec. 16-18 2 Johnson Controls Confidential Overview ? What is Performance Contracting? ? What is the Performance Contracting Process? ? When does Performance Contracting Work Best? ? Government Entity ? ESCO ? 3rd Party...

Mallory, A. D.

2013-01-01T23:59:59.000Z

317

EXOTIC OPTIONS FOR INTERRUPTIBLE ELECTRICITY SUPPLY CONTRACTS  

E-Print Network [OSTI]

the last decade have been directed at increasing competition in the generation of electricity. This hasEXOTIC OPTIONS FOR INTERRUPTIBLE ELECTRICITY SUPPLY CONTRACTS RAJNISH KAMAT and SHMUEL S. OREN of financial contracts for the supply and procurement of interruptible electricity service. While the contract

318

Contractive Systems with Inputs Eduardo D. Sontag  

E-Print Network [OSTI]

Contractive Systems with Inputs Eduardo D. Sontag Dedicated to Y. Yamamoto on the occasion of his 60th birthday Abstract. Contraction theory provides an elegant way of analyzing the behaviors-contained introduction to some basic results, with a focus on contractions with respect to non-Euclidean metrics. 1

Sontag, Eduardo

319

Contracts and Procurement eBusiness Programs  

E-Print Network [OSTI]

Contracts and Procurement eBusiness Programs Procurement Card Application Use this form the completed application to Contracts and Procurement, CP300. Contact pcard@fullerton.edu with any questions. Contracts and Procurement Use Only Processed by: Card #: Process Application Chart

de Lijser, Peter

320

Contractions of planar graphs in polynomial time?  

E-Print Network [OSTI]

Contractions of planar graphs in polynomial time? Marcin Kami´nski??1 , Dani¨el Paulusma2 that for every graph H, there exists a polyno- mial-time algorithm deciding if a planar graph can be contracted to H. We introduce contractions and topological minors of embedded (plane) graphs and show that a plane

Dimitrios, Thilikos

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Contracts and Procurement Procurement Card Program  

E-Print Network [OSTI]

Contracts and Procurement Procurement Card Program Cardholder Training Presented by Michael Pruitt process time · Legal Reference and Authority ­ California State University Policy Manual for Contracting and Maintenance Agreements · Purchases requiring a contract with an authorized signature · Narcotics

de Lijser, Peter

322

Contracts and Procurement eBusiness Programs  

E-Print Network [OSTI]

Contracts and Procurement eBusiness Programs OfficeMax Application Use this form to request the completed application to Contracts and Procurement, CP300. Contact officemax@fullerton.edu with any questions. Contracts and Procurement Use Only Processed by: Process Application

de Lijser, Peter

323

Contract Team Update Presented by Connie Motoki  

E-Print Network [OSTI]

Contract Team Update Presented by Connie Motoki January 15, 2008 #12;STC Form #12;#12;· Summary of Terms & Conditions · A Contract Manager initiates the STC. · STC is required for: New incoming subagreements & contracts Amendments to the existing agreement · Grants Team profiler cannot add money or date

Kroll, Kristen L.

324

Contracting Requirements and Why They Matter  

E-Print Network [OSTI]

Contracting Requirements and Why They Matter Presented by David E. Broome, Jr., General Counsel Amy's legally binding #12;Getting It Wrong · Case: Your unit contracts with Fun Corp (FC) to provide Student Fun Fair on campus. Contract requires that University indemnify FC for injuries/damage/liability arising

Howitt, Ivan

325

Service Contract (Rev 1/8/06) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Service Contract (Rev 1/8/06) No: Unit: Date Page 1 Contract Manager: Agreement between) and any other regulation, statutory instrument or other #12;Service Contract (Rev 1/8/06) No: Unit: Date Page 2 Contract Manager: subordinate legislation made thereunder or pursuant thereto, and any codes

326

Contract No. DE-AC02-09CH11466 CONTRACT CLAUSES  

E-Print Network [OSTI]

Contract No. DE-AC02-09CH11466 Section I M160 I-i PART II SECTION I CONTRACT CLAUSES TABLE/2/13]................................................................ 23 CLAUSE I.16A ­ FAR 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS (MAY).................................................... 26 CLAUSE I.18 - FAR 52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT (OCT 1997) ...............................................

327

1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 28  

E-Print Network [OSTI]

1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 28 2. MODIFICATION OF CONTRACT/ ORDER NO. DUNS # 032987476 s DE-AC05-76RL01830 10B. DATED (SEE ITEM 13} CODE FACILITY ONLY TO MODIFICATIONS OF COF^TTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14

328

Contract for Goods (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Goods (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of GOODS (and any related Services) between Services) to the Commission in accordance with and subject to the provisions of this Contract. 2 [The

329

Contract No. DE-AC02-09CH11466 SPECIAL CONTRACT REQUIREMENTS  

E-Print Network [OSTI]

Contract No. DE-AC02-09CH11466 Section H M152 H-i PART I SECTION H SPECIAL CONTRACT REQUIREMENTS .................................................................................................. 8 CLAUSE H.11 - SERVICE CONTRACT ACT OF 1965 (41 U.S.C. 351) ....................................................... 9 CLAUSE H.12 - WALSH-HEALY PUBLIC CONTRACTS ACT (OCT 2010) [M069 ­ 6

Princeton Plasma Physics Laboratory

330

Contract No. DE-AC02-09CH11466 SPECIAL CONTRACT REQUIREMENTS  

E-Print Network [OSTI]

Contract No. DE-AC02-09CH11466 Section H M135 H-i PART I SECTION H SPECIAL CONTRACT REQUIREMENTS .............................................................................................8 CLAUSE H.11 - SERVICE CONTRACT ACT OF 1965 (41 U.S.C. 351).....................................................9 CLAUSE H.12 - WALSH-HEALY PUBLIC CONTRACTS ACT (OCT 2010) [M069 ­ 6/27/11]................10 CLAUSE H.13

331

11. CONTRACT ID CODE IPAGE1 OFI AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 2  

E-Print Network [OSTI]

11. CONTRACT ID CODE IPAGE1 OFI PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 2 2 County, WA 99352 10A. MODIFICATION OF CONTRACT/ ORDER NO. DUNS# 032987476 DE-AC05-76RL01830 ~ 10B. DATED AND APPROPRIATION DATA (Ifrequired} CHECK ONE D D D 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS

332

Contract for Goods (Rev 06/07/11) No: Unit: Date Page 1 Contract Manager  

E-Print Network [OSTI]

Contract for Goods (Rev 06/07/11) No: Unit: __________________________________________________________________________ Date Page 1 Contract Manager: CONTRACT for the SUPPLY of GOODS (and any related Services) between Services) to the Commission in accordance with and subject to the provisions of this Contract. 2

333

Exemption from Application of the Service Contract Act -Requirements UT-B Contracts Div Certain Services  

E-Print Network [OSTI]

Exemption from Application of the Service Contract Act - Requirements UT-B Contracts Div Certain OF THE SERVICE CONTRACT ACT ­ CERTAIN SERVICES ­ REQUIREMENTS (Mar 2009) (a) The services under this Agreement of the Service Contract Act shall be included in the subcontract. (g) If the Department of Labor determines

Pennycook, Steve

334

Service Contract Act of 1965, As Amended UT-B Contracts Div Page 1 of 4  

E-Print Network [OSTI]

Service Contract Act of 1965, As Amended UT-B Contracts Div Jan 2006 Page 1 of 4 sca-1965-ext-jan06.doc SERVICE CONTRACT ACT OF 1965, AS AMENDED (Jan 2006) (a) Definitions. "Act," as used in this clause, means the Service Contract Act of 1965, as amended (41 U.S.C. 351, et seq.). "Service employee," as used

Pennycook, Steve

335

Type B Accident Investigation Board Report on the July 25, 1997, Contract Brush Cutter Injury on the Ashe-Marion #2 500 kV Line  

Broader source: Energy.gov [DOE]

On July 25, 1997, at 1205 hours, a contract hand brush cutter was seriously injured when he felled a tree close to a Bonneville Power Administration energized transmission power line, located within a BPA transmission-line corridor.

336

Automatic Conflict Detection on Contracts Stephen Fenech1  

E-Print Network [OSTI]

on collaborating, yet compet- ing, agents or virtual organisations exchanging services. Contracts, expressing with different contracts, and the combination of service contracts with local contracts can give rise to unex

Pace, Gordon J.

337

Volume 2 Appendices: Sample Solicitation and Contracting Document  

SciTech Connect (OSTI)

Appendices for the report A Guide to Performance Contracting with ESCOs. The appendices include a sample solicitation and contracting document

Baechler, Michael C.

2011-09-01T23:59:59.000Z

338

The Structure of the Enterprise Law: Complementarities among Contracts, Markets, and Laws in the Incentive Bargain of the Firm  

E-Print Network [OSTI]

Gilson, Globalizing Corporate Governance: Convergence ofnot be involved in corporate governance [See Figure 4]. ThatDevelopment of Corporate Governance in Japan), in Masahiko

Shishido, Zen-ichi

2009-01-01T23:59:59.000Z

339

Power Services, Direct Service Industries letter to the region...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

firm power (IP) to an amount sufficient to operate two potlines at Alcoa's Ferndale smelter and the Columbia Falls Aluminum Company smelter located in Montana (460 aMW). 2....

340

University of the Witwatersrand, Johannesburg Contract no CPP017B  

E-Print Network [OSTI]

University of the Witwatersrand, Johannesburg Contract no CPP017B Term service contract: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . #12;University of the Witwatersrand, Johannesburg Contract no CPP017B Term service contract Contract no CPP017B Term service contract for the preventative maintenance and the repair of generators

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

An Algebraic Theory for Web Service Contracts Cosimo Laneve1  

E-Print Network [OSTI]

An Algebraic Theory for Web Service Contracts Cosimo Laneve1 and Luca Padovani2 1 Universit`a di the notion of least service contract that is compliant with a client contract, called principal dual contract of their contracts. We identify three main goals of a theory of Web service contracts: (1) it should provide a for

Torino, UniversitĂ  di

342

Innovations in professional services firms engaged in outsourcing of IT services  

E-Print Network [OSTI]

The objective of this thesis is to understand the unique features of Professional Services Firms and the challenges associated with effective knowledge management in these firms. A framework is developed to analyze innovations ...

Kulkarni, Shridhar Waman

2009-01-01T23:59:59.000Z

343

Do Firms Want to Borrow More? Testing Credit Constraints Using a Directed Lending Program  

E-Print Network [OSTI]

This article uses variation in access to a targeted lending program to estimate whether firms are credit constrained. While both constrained and unconstrained firms may be willing to absorb all the directed credit that ...

Banerjee, Abhijit

344

The Effects of Firm Size, Corporate Governance Quality, and Bad News on Disclosure Compliance  

E-Print Network [OSTI]

Motivated by calls for increased compliance, size-based regulation, and continued exemption of small firms from internal control reporting requirements, we assess the incremental effects of firm size, corporate governance quality, and bad news...

Ettredge, Michael L.; Johnstone, Karla; Stone, Mary S.; Wang, Qian

2011-01-01T23:59:59.000Z

345

Strategies to Address Risks of Platinum Scarcity for Supply Chain Downstream Firms  

E-Print Network [OSTI]

Increased recycling, product redesign and substitution can improve firm resilience in the face of uncertainties in materials availability. The delays involved in implementing these strategies may result in unprepared firms ...

Kirchain, Randolph E., Jr.

346

Complementary capabilities in dynamic environments : the evolution of professional services in information technology product firms  

E-Print Network [OSTI]

The innovative firm must continually evaluate its boundaries - decisions often shaped through make-buy-partner evaluations and choices about where to define the firm's competences. Building off of earlier work that suggests ...

Anderson, Phillip C., Ph. D. Massachusetts Institute of Technology

2012-01-01T23:59:59.000Z

347

Energy Department Advances Market Access for U.S. Firms in Chinese...  

Office of Environmental Management (EM)

Energy Department Advances Market Access for U.S. Firms in Chinese Energy Efficiency Sector Energy Department Advances Market Access for U.S. Firms in Chinese Energy Efficiency...

348

Are Foreign Firms Privileged By Their Host Governments? Evidence From The 2000 World Business Environment Survey  

E-Print Network [OSTI]

Using the data from World Business Environment Survey (WBES) on over 10,000 firms across eighty one countries, this paper finds preliminary evidence that foreign firms enjoy significant regulatory advantages - as perceived ...

Huang, Yasheng

2005-06-03T23:59:59.000Z

349

CSEM WP 132 MARKET POWER IN CALIFORNIA'S  

E-Print Network [OSTI]

and Matthew Lewis May 2004 This paper is part of the Center for the Study of Energy Markets (CSEM) Working the potential for firms in the CaRFG wholesale gasoline industry to exercise market power, examining pricing and market power. Borenstein: Director, University of California Energy Institute (www

California at Berkeley. University of

350

contracting  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICE OF CIVILAMENDMENT OF0/%2A1/%2A en1/%2A en

351

contracts  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICE OF CIVILAMENDMENT OF0/%2A1/%2A en1/%2A

352

Proposal for the Award of a Contract for the Supplyof Superconducting 600 A Multi-Conductor Cable for the LHC  

E-Print Network [OSTI]

This document concerns the award of a contract for the supply of 25 450 metres of superconducting 600 A multi-conductor cable for the LHC. Following a market survey carried out among 55 firms in fourteen Member States, a call for tenders (IT-3140/LHC/LHC) was sent on 6 January 2003 to seven firms in six Member States. By the closing date, CERN had received five tenders from five firms in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with HEW-KABEL (DE), the lowest bidder, for the supply of 25 450 metres of superconducting 600 A multi-conductor cable for a total amount of 800 796 euros (1 174 704 Swiss francs), not subject to revision, with options for additional purchases of up to a further 5% of superconducting multi-conductor cable for an amount not exceeding 40 040 euros (58 735 Swiss francs), not subject to revision, bringing the total amount to 840 836 euros (1 233 439 Swiss francs), not subject to revision. The rate of exchange used is that stipulated in ...

2003-01-01T23:59:59.000Z

353

Proposal for the award of a contract for the provision of high-speed data lines  

E-Print Network [OSTI]

This document concerns the award of a contract for the provision of high-speed data lines of a capacity of 45Mbps to the USA for the use of CERN and a number of partners. These partners are: IN2P3 (FR), the US Department of Energy (DoE) through Caltech University, the Canadian high-energy physics community through Carleton University and the World Health Organisation. Taking advantage of the deregulation of the telecommunications market, a market survey was carried out among 18 firms in six Member States and a call for tenders (IT-2724/IT) was sent on 11 October 1999 to eight firms. By the closing date, CERN had received six tenders. The Finance Committee is invited to agree to the negotiation, on behalf of the partners, of a contract for the provision of high-speed data lines of a capacity of 45Mbps to the USA with KPN-QWEST (NL), the lowest bidder, for a total amount of 2 009 621 Swiss francs, renewable for one year, not subject to revision, of which CERN?s contribution will not exceed 400 000 Swiss francs.

1999-01-01T23:59:59.000Z

354

Fair Labor Standards Act and Service Contract Act-Price Adjustment UT-B Contracts Div (Multiple Year and Option Contracts)  

E-Print Network [OSTI]

Fair Labor Standards Act and Service Contract Act-Price Adjustment UT-B Contracts Div (Multiple STANDARDS ACT AND SERVICE CONTRACT ACT - PRICE ADJUSTMENT (MULTIPLE YEAR AND OPTION CONTRACTS) (Sept 2009 is provided under this clause. (c) The wage determination, issued under the Service Contract Act of 1965

Pennycook, Steve

355

Do Investors Forecast Fat Firms? Evidence from the Gold Mining Industry  

E-Print Network [OSTI]

Economists’ Gold Price Forecasts,” Australian Journal ofDo Investors Forecast Fat Firms? Evidence from the Gold

Borenstein, Severin; Farrell, Joseph

2006-01-01T23:59:59.000Z

356

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience4AJ01) (See95TI07)Operations2 Print258 PrintSOLI CONTRACT ID

357

AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience4AJ01) (See95TI07)Operations2 Print258 PrintSOLI CONTRACT ID11.

358

Contractions of Low-Dimensional Lie Algebras  

E-Print Network [OSTI]

Theoretical background of continuous contractions of finite-dimensional Lie algebras is rigorously formulated and developed. In particular, known necessary criteria of contractions are collected and new criteria are proposed. A number of requisite invariant and semi-invariant quantities are calculated for wide classes of Lie algebras including all low-dimensional Lie algebras. An algorithm that allows one to handle one-parametric contractions is presented and applied to low-dimensional Lie algebras. As a result, all one-parametric continuous contractions for the both complex and real Lie algebras of dimensions not greater than four are constructed with intensive usage of necessary criteria of contractions and with studying correspondence between real and complex cases. Levels and co-levels of low-dimensional Lie algebras are discussed in detail. Properties of multi-parametric and repeated contractions are also investigated.

Maryna Nesterenko; Roman Popovych

2007-01-11T23:59:59.000Z

359

Proposal for the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC  

E-Print Network [OSTI]

This document concerns the award of a contract for the supply, installation and maintenance of radiation and environmental monitoring for the LHC. Following a market survey carried out among 53 firms in twelve Member States, a call for tenders (IT-3091/TIS/LHC) was sent on 17 July 2003 to seven firms and five consortia in eight Member States. By the closing date, CERN had received seven tenders from one firm and six consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium ASSYSTEM INDUSTRIAL SERVICES (FR) - GENITRON INSTRUMENTS (DE), the lowest bidder, for the supply, installation and maintenance of radiation and environmental monitoring for the LHC for a total amount not exceeding 5 474 000 euros (8 457 000 Swiss francs), subject to revision for inflation after 1 January 2007. The rate of exchange used is that stipulated in the tender. The consortium has indicated the following distribution by country of the contract value covered by this ...

2003-01-01T23:59:59.000Z

360

Proposal for the award of a contract for the assembly on the CERN site of interconnections for the LHC machine  

E-Print Network [OSTI]

This document concerns the award of a contract for the assembly on the CERN site of interconnections for the LHC machine. Following a market survey carried out among 70 firms in fourteen Member States, a call for tenders (IT-3099/AT/LHC) was sent on 14 April 2003 to one firm and four consortia in five Member States. By the closing date, CERN had received three tenders from three consortia in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with the consortium INEO (FR), ENDEL (FR) and GTI (NL), the lowest bidder, for the assembly on the CERN site of interconnections for the LHC machine for a total amount of 6 792 836 euros (10 475 917 Swiss francs), subject to revision for inflation after 1 January 2006. The rate of exchange used is that stipulated in the tender. The consortium has indicated the following distribution by country of the contract value covered by this adjudication proposal: NL - 51%; FR - 49%.

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Energy Lawyer and Contracting Officer Update  

Broader source: Energy.gov (indexed) [DOE]

Contracting Officers Update Federal Utility Partnership Working Group Biloxi, Mississippi Julia Kelley Oak Ridge National Laboratory May 6, 2009 2 Since the November 2008 meeting:...

362

Ask the Expert - Energy Savings Performance Contracting  

Broader source: Energy.gov (indexed) [DOE]

Ask the Expert session for state and local grantees on Energy Savings Performance Contracting. Here are some tips before we get started. The session will be recorded. All...

363

Honeywell FM&T, LLC Contract No. ...  

National Nuclear Security Administration (NNSA)

shall use such special and directed sources as may be expressly required by the DOE Contracting Officer. DOE will conduct periodic appraisals of the Contractor's management of all...

364

Utility Energy Services Contracting (UESC) Overview  

Broader source: Energy.gov (indexed) [DOE]

Contracting (UESC) Overview Michael Norton Huntsville Engineering and Support Center U.S. Army Corps of Engineers Federal Utility Partnership Working Group Spring 2012 Jekyll...

365

Energy Savings Performance Contracts (ESPCs) (Fact Sheet)  

SciTech Connect (OSTI)

Overview of the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) energy savings performance contract (ESPC) program.

Not Available

2012-09-01T23:59:59.000Z

366

Portsmouth Decontamination and Decommissioning Contract FY-15...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contract to include Project Management 60% 2. Quality and Effectiveness in Performing ESH&Q & Regulatory 40% Methodology for Subjective Award Fee Calculation: 1. PTE members'...

367

M & O Contract Recompete Site -- Home Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

web site for the Y-12 National Security Complex, Pantex Plant, and Savannah River Tritium Operations Management and Operating (M&O) Contract Competition. The purpose of this...

368

Energy Savings Performance Contracts (ESPCs) (Fact Sheet)  

SciTech Connect (OSTI)

Overview of the U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) energy savings performance contract (ESPC) program.

Not Available

2011-07-01T23:59:59.000Z

369

Microsoft Word - PORTS ETS II Final Contract  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ON VETERANS (SEP 2010) ... 64 I.45. FAR 52.222-41 SERVICE CONTRACT ACT OF 1965 (NOV 2007) ... 64 I.46....

370

Utility Energy Services Contracts: Enabling Documents Update  

Broader source: Energy.gov (indexed) [DOE]

Agreement (pending final review and approval) Sample Documents UESC Sample Documents &1; Task Order under Areawide contract &1; Task Order under Basic Ordering Agreement (BOA) with...

371

Contraction & Convergence: UK carbon emissions and the  

E-Print Network [OSTI]

the EU's emissions trading scheme will do little to mitigate carbon emissions 4) Aviation growth must emissions. Keywords Contraction & Convergence; aviation; emissions trading; passengers; carbon dioxide #12

Watson, Andrew

372

Contract No. DE-AC02-09CH11466 CONTRACT CLAUSES  

E-Print Network [OSTI]

Contract No. DE-AC02-09CH11466 Section I M110 I-i PART II SECTION I CONTRACT CLAUSES TABLE) .........................................................................................24 Clause I.18 - Far 52.215-8 Order Of Precedence - Uniform Contract Format (Oct 1997

Princeton Plasma Physics Laboratory

373

Dinkins & de Hoop: Timber Harvesting Contracts P. 1 Some Legal Aspects of Timber Sale Contracts  

E-Print Network [OSTI]

, the selling of timber is an important daily activity. Most timber companies have teams of foresters devotedDinkins & de Hoop: Timber Harvesting Contracts P. 1 Some Legal Aspects of Timber Sale Contracts-4251 E-mail: cdehoop@lsu.edu #12;Dinkins & de Hoop: Timber Harvesting Contracts P. 2 Some Legal Aspects

Wu, Qinglin

374

, 1. CONTRACT ID CODE IPAG~ O F PAGES  

E-Print Network [OSTI]

·' , 1. CONTRACT ID CODE IPAG~ O F PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I 2 2. MODIFICATION OF CONTRACT/ ORDER NO. DUNS# 032987476 l8l DE-AC05-76RL01830 10B. DATED (SEE ITEM 13) CODE ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS SET FORTH IN ITEM 14

375

Contractions of Lie algebras and algebraic groups  

E-Print Network [OSTI]

Degenerations, contractions and deformations of various algebraic structures play an important role in mathematics and physics. There are many different definitions and special cases of these notions. We try to give a general definition which unifies these notions and shows the connections among them. Here we focus on contractions of Lie algebras and algebraic groups.

Dietrich Burde

2007-03-23T23:59:59.000Z

376

Newtonian fluid flow through Microfabricated Hyperbolic Contractions  

E-Print Network [OSTI]

spraying (Barnes et al. 1989). Optimization of these processes requires accurate measurements for measurement of extensional viscosity involves studying the fluid flow through contractions profiled to give extensional viscosity. To remove the effect of shear at the walls of contractions Shaw (1975) proposed the use

377

Nonlinear Contraction Tools for Constrained Optimization  

E-Print Network [OSTI]

This paper describes new results linking constrained optimization theory and nonlinear contraction analysis. Generalizations of Lagrange parameters are derived based on projecting system dynamics on the tangent space of possibly time-varying constraints. The paper formalizes the intuition that, just as convexity rather than linearity is the key property in optimization, contraction rather than linearity is the key dynamical property in this context.

Jonathan Soto; Jean-Jacques E. Slotine

2012-06-07T23:59:59.000Z

378

Human Resources Recruiting Contracts 2013 2014  

E-Print Network [OSTI]

Human Resources Recruiting Contracts 2013 ­ 2014 Department of Human Resources | Prepared by David Ferraro | July 1, 2013 #12;The Department of Human Resources provides the attached advertising contracts resources provide a national and international presence while others are focused more regionally

Crawford, T. Daniel

379

Power Optimization and Management in Embedded Systems1 Massoud Pedram  

E-Print Network [OSTI]

1 Power Optimization and Management in Embedded Systems1 Massoud Pedram University of Southern under contract number DAAB07-00-C-L516. Abstract Power-efficient design requires reducing power on the system performance and quality of service (QoS). Power-aware high-level language compilers, dynamic power

Pedram, Massoud

380

Contract Awarded to Small Business for Support Services | Department of  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart Grid RFI:FresnoM-WGDepartmentEnergy Contract Awarded

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

IDIQ DOE ESPC Contract Modifications | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy Health andof EnergyHydrogen-PoweredIDIQ DOE ESPC Contract Modifications

382

Bonneville Power Administration's Purchasing of Energy Savings  

E-Print Network [OSTI]

BONNEVILLE POWER ADMINISTRATION'S PURCHASE OF ENERGY SAVINGS Harold (Skip) Schick Leslie E. McMillan Bonneville Power Administration Port1and, Oregon INTRODUCTION The Bonneville Power Administration (BPA) is conducting a commercial... buildings retrofit program in the Pacific Northwest by making pay ments to a sponsor, such as an energy serv ice company or architectural and engineering firm, for energy savings which actually occur in a commercial building. This effort is one...

Schick, H.

383

Microsoft Word - 2010_NESC_Power_Purchase_Contract_CX.doc  

Broader source: Energy.gov (indexed) [DOE]

Waste System in process summer 2009. State of Washington permits: Department of Ecology - permit applications in progress (per Lincoln County. Economic Development Council...

384

Regional Dialogue Policy Implementation (power services/contracts)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromising ScienceRecent SRELRecyclingProjectsRegional Dialogue >

385

WAPA General Power Contract Provisions | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012Nuclear GuideReportVictor KaneContractfrom

386

Western Area Power Administration Advancement of Funds Contract  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and MaterialsWenjun Deng Associate ResearchWestern Area

387

Local firms benefit from Jefferson Lab upgrade | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and Interfaces Sample6,Local Correlations andLocal firms benefit from

388

PRICING ENERGY DERIVATIVES BY LINEAR PROGRAMMING: TOLLING AGREEMENT CONTRACTS  

E-Print Network [OSTI]

PRICING ENERGY DERIVATIVES BY LINEAR PROGRAMMING: TOLLING AGREEMENT CONTRACTS Valeriy Ryabchenko for pricing energy derivatives known as tolling agreement contracts. The pricing problem is reduced energy derivatives. The problem of pricing such contracts falls into the class of multiple optimal

Uryasev, Stanislav

389

Hydraulic and slurry flows through a channel contraction  

E-Print Network [OSTI]

Hydraulic and slurry flows through a channel contraction Onno Bokhove o, Twente #12;Hydraulic flow through channel contraction Outline · 1. Introduction · 2. Experiments · 3. Conclusions · References ISSF 2008 University of Twente Page 2 #12;Hydraulic flow through channel contraction

Al Hanbali, Ahmad

390

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Wastren-EnergX Mission Support LLC Contract Number: DE-CI0000004 Contract Type: Cost Plus Award Fee 128,879,762 Contract Period: December 2009 - July 2015 Fee Information...

391

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

- September 2015 September 2014 Contractor: Contract Number: Contract Type: Idaho Treatment Group LLC DE-EM0001467 Cost Plus Award Fee Fee Information 444,161,295 Contract Period:...

392

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

& Wilcox Conversion Services, LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee Fee Available 4,324,912 408,822,369 Contract Period: December 2010 -...

393

Learn How To Grow Your Business Through Government Contracting  

Broader source: Energy.gov [DOE]

OPEN for Government Contracts presents: Summit for Success is a FREE event hosted by American Express OPEN. The "Grow Your Business Through Government Contracting” events are FREE, day-long events focusing on small business government contracting.

394

Policy Flash 2013-41 Contracts Periods of Performance Exceeding...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

41 Contracts Periods of Performance Exceeding 5 Years Policy Flash 2013-41 Contracts Periods of Performance Exceeding 5 Years Attached is Policy Flash 2013-41 Contracts Periods of...

395

Grants, Clinical Trials and Contracts Table of Contents  

E-Print Network [OSTI]

on Documentation Required by the Standard LSUHSC Professional Services Contract and A Sample of Documentation Language Required by the Latest Revised Interim LSU Public Hospital Professional Services Contract(s). III

396

Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.  

SciTech Connect (OSTI)

This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

United States. Bonneville Power Administration.

1993-07-01T23:59:59.000Z

397

Forecast of Contracting and Subcontracting Opportunities, Fiscal year 1995  

SciTech Connect (OSTI)

Welcome to the US Department of Energy`s Forecast of Contracting and Subcontracting Opportunities. This forecast, which is published pursuant to Public Low 100--656, ``Business Opportunity Development Reform Act of 1988,`` is intended to inform small business concerns, including those owned and controlled by socially and economically disadvantaged individuals, and women-owned small business concerns, of the anticipated fiscal year 1995 contracting and subcontracting opportunities with the Department of Energy and its management and operating contractors and environmental restoration and waste management contractors. This document will provide the small business contractor with advance notice of the Department`s procurement plans as they pertain to small, small disadvantaged and women-owned small business concerns.Opportunities contained in the forecast support the mission of the Department, to serve as advocate for the notion`s energy production, regulation, demonstration, conservation, reserve maintenance, nuclear weapons and defense research, development and testing, when it is a national priority. The Department`s responsibilities include long-term, high-risk research and development of energy technology, the marketing of Federal power, and maintenance of a central energy data collection and analysis program. A key mission for the Department is to identify and reduce risks, as well as manage waste at more than 100 sites in 34 states and territories, where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. Each fiscal year, the Department establishes contracting goals to increase contracts to small business concerns and meet our mission objectives.

Not Available

1995-02-01T23:59:59.000Z

398

WTP Contract Section F Contract No. DE-AC27-01RV14136 Conformed Thru Modification No. A143  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500IIVasudhaSurface.Laboratory30,WP-07 power ratesF Contract No.

399

WTP Contract Section D Contract No. DE-AC27-01RV14136 Conformed Thru Modification No. A143  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500IIVasudhaSurface.Laboratory30,WP-07 power ratesF ContractD

400

Fair Labor Standard Act and Service Contract Act Price Adjustment UT-B Contracts Div Page 1 of 1  

E-Print Network [OSTI]

Fair Labor Standard Act and Service Contract Act ­ Price Adjustment UT-B Contracts Div Sept 2009 Page 1 of 1 flsa-price-adj-ext-sept09.doc FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT ACT - PRICE

Pennycook, Steve

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Jefferson Lab Contract to be Awarded to Jefferson Science Associates...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Jefferson Lab Contract to be Awarded to Jefferson Science Associates, LLC for Management and Operation of World-Class Office of Science Laboratory Jefferson Lab Contract to be...

402

DOE Awards Small Business Contract for Support, Planning Services...  

Energy Savers [EERE]

Awards Small Business Contract for Support, Planning Services to Office of Environmental Management DOE Awards Small Business Contract for Support, Planning Services to Office of...

403

altered spontaneous contractions: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Unofficial Conformed Copy as of 1 OF ENERGY NATIONAL NUCLEAR SECURITY ADMINISTRATION NNSA SERVICE CENTER- ALBUQUERQUE M&O CONTRACT SUPPORT 28 CONTRACTIVE AND COMPLETELY...

404

arterial contraction capacity: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Unofficial Conformed Copy as of 1 OF ENERGY NATIONAL NUCLEAR SECURITY ADMINISTRATION NNSA SERVICE CENTER- ALBUQUERQUE M&O CONTRACT SUPPORT 26 CONTRACTIVE AND COMPLETELY...

405

attenuates vascular contractions: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Unofficial Conformed Copy as of 1 OF ENERGY NATIONAL NUCLEAR SECURITY ADMINISTRATION NNSA SERVICE CENTER- ALBUQUERQUE M&O CONTRACT SUPPORT 23 CONTRACTIVE AND COMPLETELY...

406

Department of Energy to Compete Management & Operating Contract...  

Energy Savers [EERE]

to Compete Management & Operating Contract for its National Renewable Energy Laboratory Department of Energy to Compete Management & Operating Contract for its National Renewable...

407

School District Success Story-A Performance Contracting Program...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

School District Success Story-A Performance Contracting Program School District Success Story-A Performance Contracting Program Provides an overview case study of Douglas County,...

408

2014 National Small Business Contracting Summit - US Women's...  

Broader source: Energy.gov (indexed) [DOE]

2014 National Small Business Contracting Summit - US Women's Chamber of Commerce & National Association of Small Business Contractors 2014 National Small Business Contracting...

409

SBA Expands Access to Contracting Opportunities for Women-Owned...  

Office of Environmental Management (EM)

SBA Expands Access to Contracting Opportunities for Women-Owned Small Businesses SBA Expands Access to Contracting Opportunities for Women-Owned Small Businesses January 22, 2013 -...

410

Energy Savings Performance Contracting Legislation Data and Other...  

Office of Environmental Management (EM)

Energy Savings Performance Contracting Legislation Data and Other Resources Energy Savings Performance Contracting Legislation Data and Other Resources These tools provide data and...

411

Review of Allegations Regarding Hiring and Contracting in the...  

Office of Environmental Management (EM)

Review of Allegations Regarding Hiring and Contracting in the Office of Energy Efficiency and Renewable Energy Review of Allegations Regarding Hiring and Contracting in the Office...

412

Self-Funded Energy Savings Performance Contracting Programs ...  

Energy Savers [EERE]

Self-Funded Energy Savings Performance Contracting Programs Self-Funded Energy Savings Performance Contracting Programs Provides introductory information about self-funded Energy...

413

DOE to Address Small Businesses Barriers in Government Contracting...  

Broader source: Energy.gov (indexed) [DOE]

to Address Small Businesses Barriers in Government Contracting at Waste Management Conference DOE to Address Small Businesses Barriers in Government Contracting at Waste Management...

414

Streamlining the Government Contracting Process, One System at...  

Broader source: Energy.gov (indexed) [DOE]

Streamlining the Government Contracting Process, One System at a Time Streamlining the Government Contracting Process, One System at a Time July 31, 2012 - 1:31pm Addthis...

415

DOE Announces Webinars on New Energy Savings Performance Contracting...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

New Energy Savings Performance Contracting Resources, Better Buildings Challenge, and More DOE Announces Webinars on New Energy Savings Performance Contracting Resources, Better...

416

TO: Procurement Directors/Contracting Officers FROM: Director  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 DATE: October 6, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and...

417

Energy Lawyers and Contracting Officers Group Special Session...  

Broader source: Energy.gov (indexed) [DOE]

Group Special Session Energy Lawyers and Contracting Officers Group Special Session Presentation covers the Energy Lawyers and Contracting Officers Group Special Session at the...

418

UESC Contracting Officer Issues Round-Up | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

UESC Contracting Officer Issues Round-Up UESC Contracting Officer Issues Round-Up Presentation-given at the Spring 2013 Federal Utility Partnership Working Group (FUPWG)...

419

DOE Head Contracting Authority (HCA) and Procurement Director...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

DOE Head Contracting Authority (HCA) and Procurement Director (PD) Directory DOE Head Contracting Authority (HCA) and Procurement Director (PD) Directory HCA and PD List Sept 23...

420

Energy Savings Performance Contracting-Savings Measurement and...  

Broader source: Energy.gov (indexed) [DOE]

Energy Savings Performance Contracting-Savings Measurement and Verification Transcript 2-24-2011.doc Energy Savings Performance Contracting-Savings Measurement and Verification...

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Pennsylvania Success Story-A Performance Contracting Program...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Pennsylvania Success Story-A Performance Contracting Program Pennsylvania Success Story-A Performance Contracting Program Provides an overview case study of Pennsylvania's...

422

TO: Procurement Directors/Contracting Officers FROM: Director  

Broader source: Energy.gov (indexed) [DOE]

4 DATE: July 7, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and...

423

Performance Contracting and Energy Efficiency in the State Government...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Performance Contracting and Energy Efficiency in the State Government Market Performance Contracting and Energy Efficiency in the State Government Market Reviews the magnitude of...

424

Definitive Contract (Awarded 8-16-10).pdf  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for accomplishing the identified work. This contract applies performance-based contracting approaches and expects the contractor to implement techniques that emphasize safe,...

425

Energy Savings Performance Contracting (ESPC)-The ESPC Process...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

The ESPC Process Energy Savings Performance Contracting (ESPC)-The ESPC Process Describes the general Energy Savings Performance Contracting process, including a description and...

426

Before the Subcommittee on Financial and Contracting Oversight...  

Broader source: Energy.gov (indexed) [DOE]

Financial and Contracting Oversight - Committee on Homeland Security and Governmental Affairs Before the Subcommittee on Financial and Contracting Oversight - Committee on Homeland...

427

State and Local Energy Savings Performance Contracting: Savings...  

Broader source: Energy.gov (indexed) [DOE]

State and Local Energy Savings Performance Contracting: Savings Measurement and Verification (M&V) State and Local Energy Savings Performance Contracting: Savings Measurement and...

428

New Online Marketplace for Small Business Contracting Launched...  

Broader source: Energy.gov (indexed) [DOE]

New Online Marketplace for Small Business Contracting Launched by Presidential Fellows New Online Marketplace for Small Business Contracting Launched by Presidential Fellows...

429

TO: Procurement Directors/Contracting Officers FROM: Director  

Broader source: Energy.gov (indexed) [DOE]

0 DATE: May 30, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and...

430

UESC Contracting Officer Issues Round-Up | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Contracting Officer Issues Round-Up UESC Contracting Officer Issues Round-Up Presentation-given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG)...

431

What is Energy Savings Performance Contracting (ESPC)? | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

What is Energy Savings Performance Contracting (ESPC)? What is Energy Savings Performance Contracting (ESPC)? Provides a one page overview of energy savings performance...

432

Model Energy Service Company Pre-Qualification Contract  

Broader source: Energy.gov [DOE]

This page contains information and documents for creating a contract between an Energy Service Company and a state energy office (or other entity managing a performance contracting program).

433

Colorado Success Story-A Performance Contracting Program | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Colorado Success Story-A Performance Contracting Program Colorado Success Story-A Performance Contracting Program Provides an overview case study of Colorado's Performance...

434

Massachusetts Success Story-A Performance Contracting Program...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Massachusetts Success Story-A Performance Contracting Program Massachusetts Success Story-A Performance Contracting Program Provides an overview case study of Massachusetts'...

435

Assistance and Contacts for Energy Savings Performance Contracts...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Contracts The Federal Energy Management Program (FEMP) offers assistance to help federal agencies develop energy savings performance contract (ESPC) projects that are financially,...

436

Transition for Pantex and Y-12 Contract Completed | National...  

National Nuclear Security Administration (NNSA)

Field Offices Welcome to the NNSA Production Office NPO News Releases Transition for Pantex and Y-12 Contract Completed Transition for Pantex and Y-12 Contract Completed The...

437

Energy Savings Performance Contract Project Assistance for Agencies...  

Broader source: Energy.gov (indexed) [DOE]

Savings Performance Contract Project Assistance for Agencies Energy Savings Performance Contract Project Assistance for Agencies Fact sheet details an overview of Federal Energy...

438

DOE Awards $3 Million Contract to Oak Ridge Associated Universities...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Million Contract to Oak Ridge Associated Universities for Expert Review of Yucca Mountain Work DOE Awards 3 Million Contract to Oak Ridge Associated Universities for Expert...

439

POLICY GUIDANCE MEMORANDUM #34B Direct Hire Authority for Contract...  

Energy Savers [EERE]

4B Direct Hire Authority for Contract Specialist positions POLICY GUIDANCE MEMORANDUM 34B Direct Hire Authority for Contract Specialist positions Policy Guidance Memorandum 34B...

440

DOE Awards Small Business Contract to Support Cleanup of New...  

Energy Savers [EERE]

Task Order for Disposal of Los Alamos National Lab Waste DOE Awards Support Service Contract DOE Awards Small Business Contract for Support, Planning Services to Office of...

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

TO: Procurement Directors FROM: Director, Contract and Financial...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

performing on contracts subject to construction wage rate requirements andor the Service Contract Labor Standards statute. Use of Clause 52.222-99 will increase efficiency and...

442

Utility Energy Service Contract Contacts | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Contacts Utility Energy Service Contract Contacts For more information about utility energy service contracts, contact: Contact Organization David McAndrew 202-586-7722 Federal...

443

Portland State University Personal/Professional Service Contract (PSC)  

E-Print Network [OSTI]

Portland State University Personal/Professional Service Contract (PSC) INSTRUCTIONS IF ANY REQUIRED A University's Personal Services Contract Terms and Conditions: This must be given to Contractor before

Caughman, John

444

Annex I ITER Organization Service Contract General Conditions...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Annex I ITER Organization Service Contract General Conditions (2014) Page 1 of 21 GENERAL CONDITIONS FOR ITER ORGANIZATION SERVICE CONTRACTS (2014) Definitions...

445

Sample Contract Language for Information Technology Using Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Sample Contract Language for Information Technology Using Energy-Efficient Products Sample Contract Language for Information Technology Using Energy-Efficient Products Document...

446

Model Acquisition Language for Energy-Efficient Product Contracts...  

Broader source: Energy.gov (indexed) [DOE]

Technologies Energy-Efficient Products Model Acquisition Language for Energy-Efficient Product Contracts Model Acquisition Language for Energy-Efficient Product Contracts...

447

Energy Saving Performance Contracting (ESPC) Basics (Text Version...  

Broader source: Energy.gov (indexed) [DOE]

Saving Performance Contracting (ESPC) Basics (Text Version) Energy Saving Performance Contracting (ESPC) Basics (Text Version) Chani Vines: Hello. We'll be starting in five...

448

Integrating Solar PV into Energy Services Performance Contracts...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Integrating Solar PV into Energy Services Performance Contracts: Options for Local Governments Nationwide Integrating Solar PV into Energy Services Performance Contracts: Options...

449

DOE Awards Management and Operating Contract for DOE's Strategic...  

Energy Savers [EERE]

DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve September 18,...

450

Energy Department Awards Small Business Contract for Legacy Management...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Business Contract for Legacy Management Work to S.M. Stoller Corporation Energy Department Awards Small Business Contract for Legacy Management Work to S.M. Stoller...

451

DRAFT MANAGEMENT PLAN APPENDIX A-1 Contract Entities and Plan Participants  

E-Print Network [OSTI]

Province (USP) Plan in addition to those contracted by the Northwest Power and Conservation Council (NPCC of three primary elements: Part I. An Assessment of the current and potential physical and biological AND PLAN PARTICIPANTS BOI043620001.DOC/KG A1-2 IDFG organized a technical team of natural resource

452

Contract 98 Self-Assessment  

SciTech Connect (OSTI)

This report documents the results of LBL`s Self-Assessment required by Appendix F to Contract DE ACOO3765F00098. This self assessment covers the performance measures set forth in Appendix F except those requiring an external audit. The performance measures for LBL are in the areas of ES&H Finance, Human Services and Procurement and Property. LBL is a multi-program laboratory operated by the University of California (UC) for DOE. The mission of LBL includes performing research in energy, general, and life sciences. LBL facilities include the main site on 130 acres located in the cities of Berkeley and Oakland; laboratories and offices located in buildings on the UC Berkeley Campus; and three leased buildings in the cities of Berkeley and Emeryville. 1. Involvement of Line Management in the assessment process to provide awareness and ownership. 2. Using existing assessments, audits and appraisals in lieu of a new assessment wherever possible. 3. Conduct of the assessments by individuals with functional responsibility and knowledge of the areas being assessed. 4. Interaction with individuals performing assessments at other Laboratories to enhance our learning process. As anticipated, a number of findings will require corrective action. General corrective actions are identified for key findings in this report. In early May 1993, this Laboratory will begin the development of detailed formal corrective action plans which will be entered into a laboratory automated corrective action tracking system.

Not Available

1993-04-01T23:59:59.000Z

453

EMEF DMC EFS-95-004 GDP TURNOVER CONTINGENCY PLANNING POWER CONTRACTIN...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

111111111111111111111111 EMEF DMC EFS-95-004 GDP TURNOVER CONTINGENCY PLANNING POWER CONTRACTING OPTIONS This document is approved f()i puolic release per review by: er "-...

454

Microsoft PowerPoint - Post-2014 August 25, 2011 Proposed Allocations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Two components: Integrated Resource Planning (IRP) Power Marketing Initiative (PMI) Extended contracts for existing customers for 20 years through September 30, 2024...

455

Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830  

E-Print Network [OSTI]

in the Bonneville Power Administration's footprint as an energy arbitrage instrument. This analysis was performed with collaboration by the Bonneville Power Administration and funded by the Energy Storage Systems Program of the UPNNL-19300 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 Energy

456

Firm Value and Corporate Governance: How the Former Determines the Latter  

E-Print Network [OSTI]

The Econometrics of Corporate Governance Studies, Cambridge,Firm Value and Corporate Governance: How the FormerAbstract A model of corporate governance must explain (i)

Hermalin, Benjamin E.

2008-01-01T23:59:59.000Z

457

Financial liberalisation and the capital structure of firms listed on the Johannesburg stock exchange.  

E-Print Network [OSTI]

??This thesis examines the impact of financial liberalisation on the capital structure of non-financial firms listed on the Johannesburg Stock Exchange (JSE). The research hypotheses… (more)

Chipeta, Chimwemwe

2012-01-01T23:59:59.000Z

458

Making contracting work better and cost less: Report of the Contract Reform Team  

SciTech Connect (OSTI)

In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

Not Available

1994-02-01T23:59:59.000Z

459

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT  

National Nuclear Security Administration (NNSA)

Previous edition unusable 15C. DATE SIGNED t1() 13 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) STANDARD FORM 30 (REV. 10-83) Prescribed by GSA FAR (48...

460

Utilities: Emerging Opportunities in Performance Contracting  

E-Print Network [OSTI]

obligations to regulators. Although many of these contracts have been successful, the utilities often have mixed (if not outright negative) feelings toward the performance contractors. These often adversarial relationships stem in part from the lack of utility...

Wood, G. W.

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

2014 National Small Business Federal Contracting Summit  

Broader source: Energy.gov [DOE]

2014 National Small Business Federal Contracting Summit - DC Summer Conference presented jointly by the U.S. Women's Chamber of Commerce and the American Small Business Chamber of Commerce /...

462

DOE-BATTELLE PRIME CONTRACT MANAGEMENT & OPERATIONS  

E-Print Network [OSTI]

DOE-BATTELLE PRIME CONTRACT FOR THE MANAGEMENT & OPERATIONS OF PACIFIC NORTHWEST NATIONAL Introduction C ­ 2 RESERVED C ­ 3 Performance Expectations, Objectives, and Measures C ­ 3.1 Core Expectations

463

Essays on optimization and incentive contracts  

E-Print Network [OSTI]

(cont.) In the second part of the thesis, we focus on the design and analysis of simple, possibly non-coordinating contracts in a single-supplier, multi-retailer supply chain where retailers make both pricing and inventory ...

Goundan, Pranava Raja

2007-01-01T23:59:59.000Z

464

Negotiating Rates and Contracts for Qualifying Facilities  

E-Print Network [OSTI]

The implementation of a cogeneration project or other qualifying facility (QF) requires the development of contractual relationships with one or more electric utilities. The relationships may involve the application of existing rates and contracts...

Collier, S. E.

465

Financing for Utility Energy Service Contracts  

Broader source: Energy.gov [DOE]

Financing is a significant portion of utility energy service contract (UESC) costs. Experience shows several things the Federal Government can do to get the best value by reducing UESC financial transaction costs and interest.

466

Relationally-Parametric Polymorphic Contracts Brown University  

E-Print Network [OSTI]

Relationally-Parametric Polymorphic Contracts Arjun Guha Brown University arjun@cs.brown.edu Jacob are not made or distributed for profit or commercial advantage and that copies bear this notice and the full

Krishnamurthi, Shriram

467

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 19, NO. 1, FEBRUARY 2004 243 Framework for the Design and Analysis  

E-Print Network [OSTI]

. The proposal uses locational marginal prices (LMPs) to identify congestion situations and to devise a scheme Abstract--The capability to deal effectively with the uncertainty associated with locational marginal/firm/financial transmission rights, locational mar- ginal prices, standard market design, transmission congestion contracts. I

Gross, George

468

Mining Business Contracts for Service Exceptions Xibin Gao, Munindar P. Singh, Fellow, IEEE, and Pankaj Mehra  

E-Print Network [OSTI]

in service contracts and thereby assists users in reviewing contracts. Enlil produces promising results

469

Mission Support Contract Section J Contract No. DE-AC06-09RL14728  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-1 ATTACHMENT J-1 ABBREVIATIONS AND ACRONYM LIST % percent ACO Administrative Contracting Officer ACREM Accountable classified removable electronic media AEA Atomic Energy Act of...

470

Concentrating Solar Power (Fact Sheet), SunShot Initiative, U.S. Department of Energy (DOE)  

Broader source: Energy.gov [DOE]

Concentrating Solar Power (CSP) offers a utility-scale, firm, dispatchable renewable energy option that can help meet the nation's goal of making solar energy cost competitive with other energy sources by the end of the decade.

471

Applying electronic contracting to the aerospace aftercare domain Felipe Meneguzzia,  

E-Print Network [OSTI]

Applying electronic contracting to the aerospace aftercare domain Felipe Meneguzzia, , Sanjay The contract project was a European Commission project whose aim was to develop frame- works, components contracts. In this context, an electronic contract provides a specifi- cation of the expected behaviours

Luck, Michael

472

Contract Periods for 2012-2013 Residence Halls  

E-Print Network [OSTI]

Contract Periods for 2012-2013 Residence Halls All of the residence halls are on Fall/Spring Contracts. THERE IS NO FALL ONLY CONTRACT. · The residence halls open for the fall semester on September 1 rate for the number of days they stay. Apartments Your contract entitles you to an apartment space

Minnesota, University of

473

The Utility Energy Savings Contract for Brookhaven National Laboratory  

E-Print Network [OSTI]

The Utility Energy Savings Contract for Brookhaven National Laboratory Evelyn Landini Director;2 Tonight's Presentation Answering the questions: ­ What is a Utility Energy Services Contract? ­ Advantages of the contract? · Where will the efficiencies be found? #12;3 What is a Utility Energy Services Contract (or

Johnson, Peter D.

474

Quick Guide: Utility Energy Services Contracting (Fact Sheet)  

SciTech Connect (OSTI)

Summarized guide to conducting Federal energy management projects through utility energy services contracts.

Not Available

2009-07-01T23:59:59.000Z

475

STANDARD TERMS OF PURCHASE APPLICABLE TO SUPPLY AND SERVICES CONTRACTS  

E-Print Network [OSTI]

STANDARD TERMS OF PURCHASE APPLICABLE TO SUPPLY AND SERVICES CONTRACTS ENTERED INTO BY SUD TOULON and its co-contracting parties for all government supplies and services contracts entered into pursuant supply and services contracts in its version annexed to the Decree of 19 January 2009 approving

Chamroukhi, Faicel

476

MAJOR CONFORMED CONTRACTS LINKS Site/Project Contract Link Idaho  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | DepartmentEnergy InvitationLegaltoLizLow- LEVEL

477

Proposal for the award of a contract for the supply and installation of an air-handling plant for the CNGS project  

E-Print Network [OSTI]

This document concerns the award of a contract for the supply and installation of an air-handling plant for the CNGS underground structures. Following a market survey carried out among 85 firms in fourteen Member States, a call for tenders (IT-3078/ST/CNGS) was sent on 5 September 2003 to five firms and four consortia in seven Member States. By the closing date, CERN had received four tenders from three firms and one consortium in four Member States. The Finance Committee is invited to agree to the negotiation of a contract with AMEC SPIE (DE), the lowest bidder, for the supply and installation of an air-handling plant for the CNGS underground structures for a total amount of 984 493 euros (1 523 512 Swiss francs), not subject to revision, with options for additional equipment for an additional amount not exceeding 88 161 euros (136 430 Swiss francs), not subject to revision, bringing the total amount to 1 072 654 euros (1 659 942 Swiss francs), not subject to revision. The rate of exchange used is that stipu...

2003-01-01T23:59:59.000Z

478

Transaction Based Power Flow Analysis For Transmission Utilization Allocation  

E-Print Network [OSTI]

transactions as well as the effect of reactive power on transmission losses and active power flows. Two the electric power industry moves into an era of supply competition and consumer choice, the power system electricity market at the ex ante phase; (ii) MW generations are decided by bilateral contracts and other

479

BPA Contract No. 11PB-21385  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bridge Agreement between Bonneville Power Administration and British Columbia Hydro and Power Authority Whereas Bonneville Power Administration and British Columbia Hydro...

480

TRIPLE OUTPUT POWER SUPPLY Agilent MODEL E3630A  

E-Print Network [OSTI]

, manufacture, and intended use of the instrument. Agilent Technologies assumes no liability for the customer, the instrument chassis and cabinet must be connected to an electrical ground. The instrument must be connected to the ac power supply mains through a three-conductor power cable, with the third wire firmly connected

Ravikumar, B.

Note: This page contains sample records for the topic "firm power contracts" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Incomplete_Grade_Contract_10_31.docx | Revised: 10/31/2013 Graduate Incomplete Grade Contract Form  

E-Print Network [OSTI]

Incomplete_Grade_Contract_10_31.docx | Revised: 10/31/2013 Graduate Incomplete Grade Contract Form-2846 | WEB: http://www.grad.usf.edu/ PURPOSE OF INCOMPLETE CONTRACT An Incomplete Grade ("I") is exceptional MISSING ASSIGNMENTS AT THE TIME WHEN THE INCOMPLETE GRADE CONTRACT IS SIGNED. For example, a student may

Meyers, Steven D.

482

INSTRUCTIONS TO CONTRACTING OFFICERS: The Special Contract Requirement "Workers Compensation Insurance (Defense Base Act) Services (OCT 2008)"  

E-Print Network [OSTI]

INSTRUCTIONS TO CONTRACTING OFFICERS: The Special Contract Requirement "Workers Compensation Insurance (Defense Base Act) ­ Services (OCT 2008)" shall be included in the contract as applicable. Whenever Defense Base Act (DBA) insurance is required under the contract for services, the following

US Army Corps of Engineers

483

Do Generation Firms in Restructured Electricity Markets Have Incentives to Support Socially-Efficient Transmission Investments? *  

E-Print Network [OSTI]

1 Do Generation Firms in Restructured Electricity Markets Have Incentives to Support Socially that generation firms have in restructured electricity markets for supporting long-term transmission investments.S. transmission system is under stress (Abraham, 2002). Growth of electricity demand and new generation capacity

484

ANALYSE DES DETERMINANTS DE LA GESTION DES RESULTATS : CAS DES FIRMES CANADIENNES FRANCAISES ET TUNISIENNES  

E-Print Network [OSTI]

- 1 - ANALYSE DES DETERMINANTS DE LA GESTION DES RESULTATS : CAS DES FIRMES CANADIENNES FRANCAISES)" #12;- 2 - ANALYSE DES DETERMINANTS DE LA GESTION DES RESULTATS : CAS DES FIRMES CANADIENNES FRANCAISES article sans l'aval Ă©crit des auteurs'' "Please do not cote wihout authors' written permission" Adresse de

Paris-Sud XI, Université de

485

Financial Constraints and Firm Export hal-00973114,version1-3Apr2014  

E-Print Network [OSTI]

to overcome the sunk entry costs into export markets and expand their activities abroad. Keywords: Export; Firm heterogeneity; Financial constraints; Sunk costs JEL Classification: F14; G32; L25; D92 1 both firm heterogeneity and the relevance of sunk entry costs into export markets.1 Once extended

Paris-Sud XI, Université de

486

Natural gas contracts in efficient portfolios  

SciTech Connect (OSTI)

This report addresses the {open_quotes}contracts portfolio{close_quotes} issue of natural gas contracts in support of the Domestic Natural Gas and Oil Initiative (DGOI) published by the U.S. Department of Energy in 1994. The analysis is a result of a collaborative effort with the Public Service Commission of the State of Maryland to consider {open_quotes}reforms that enhance the industry`s competitiveness{close_quotes}. The initial focus of our collaborative effort was on gas purchasing and contract portfolios; however, it became apparent that efficient contracting to purchase and use gas requires a broader consideration of regulatory reform. Efficient portfolios are obtained when the holder of the portfolio is affected by and is responsible for the performance of the portfolio. Natural gas distribution companies may prefer a diversity of contracts, but the efficient use of gas requires that the local distribution company be held accountable for its own purchases. Ultimate customers are affected by their own portfolios, which they manage efficiently by making their own choices. The objectives of the DGOI, particularly the efficient use of gas, can be achieved when customers have access to suppliers of gas and energy services under an improved regulatory framework. The evolution of the natural gas market during the last 15 years is described to account for the changing preferences toward gas contracts. Long-term contracts for natural gas were prevalent before the early 1980s, primarily because gas producers had few options other than to sell to a single pipeline company, and this pipeline company, in turn, was the only seller to a gas distribution company.

Sutherland, R.J.

1994-12-01T23:59:59.000Z

487

QA Standard Contract Language Deliverable  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 | DepartmentLoans | Department of Energy Q&A:TheQA

488

Energy Savings Performance Contracts Summary  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResources DOEElectrical SafetyEnergythroughDetroit|EducationEnergy

489

Firm-based Measurements of Market Power in Transmission-Constrained Electricity  

E-Print Network [OSTI]

(OPF) program that determines the market outcome, including the locational marginal prices (LMPs to incorporate transmission constraints. For example, [4] uses revenue-price sensitivities to estimate the price market clearing prices without affecting the dispatch. As a third example, the element competitiveness

Baldick, Ross

490

Proposal to negotiate an amendment to an existing contract for the supply and installation of interconnecting pipework for cryogenics and cooling of the LHC  

E-Print Network [OSTI]

This document concerns the proposal to negotiate an amendment to an existing contract for the supply and installation of interconnecting pipework for cryogenics and cooling of the LHC. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to the existing contract for the supply and installation of interconnecting pipework for cryogenics and cooling of the LHC with the firm DEMONT (IT) for an amount exceeding the previously approved amount of 3 818 877 euros (5 881 000 Swiss francs) by up to 2 157 800 euros (3 323 000 Swiss francs), subject to revision for inflation, bringing the total contract amount to a maximum amount of 5 976 677 euros (9 204 000 Swiss francs), subject to revision for inflation. The rate of exchange used is that stipulated in the initial tender (CERN/FC/4322). The firm has declared the following origin of the equipment covered by this adjudication proposal: IT - 85%, CZ - 5%, SK - 4%, FR - 3%, PL - 3%.

2003-01-01T23:59:59.000Z

491

Alaska Power Administration combined financial statements, schedules and supplemental reports, September 30, 1995 and 1994  

SciTech Connect (OSTI)

This report presents the results of the independent certified public accountant`s audit of the Department of Energy`s Alaska Power Administration`s (Alaska) financial statements as of September 30, 1995. The auditors have expressed an unqualified opinion on the 1995 statements. Their reports on Alaska`s internal control structure and on compliance with laws and regulations are also provided. The Alaska Power Administration operates and maintains two hydroelectric projects that include five generator units, three power tunnels and penstocks, and over 88 miles of transmission line. Additional information about Alaska Power Administration is provided in the notes to the financial statements. The 1995 financial statement audit was made under the provisions of the Inspector General Act (5 U.S.C. App.), as amended, the Chief Financial Officers (CFO) Act (31 U.S.C. 1500), and Office of Management and Budget implementing guidance to the CFO Act. The auditor`s work was conducted in accordance with generally accepted government auditing standards. To fulfill the audit responsibilities, the authors contracted with the independent public accounting firm of KPMG Peat Marwick (KPMG) to conduct the audit for us, subject to review. The auditor`s report on Alaska`s internal control structure disclosed no reportable conditions that could have a material effect on the financial statements. The auditor also considered the overview and performance measure data for completeness and material consistency with the basic financial statements, as noted in the internal control report. The auditor`s report on compliance with laws and regulations disclosed no instances of noncompliance by Alaska.

NONE

1995-12-31T23:59:59.000Z

492

October 17, 2002 Bonneville Power Administration  

E-Print Network [OSTI]

October 17, 2002 Bonneville Power Administration PO Box 12999 Portland, OR 97208 comment for the post 2006 utility contracts. As a federal entity created to serve the people of its region, Bonneville for the region and stimulate economic growth. Geothermal: Newberry volcano, OR Geothermal power is the natural

493

Trainers by design : a case study of inter-firm learning, institution building and local governance in western Mexico  

E-Print Network [OSTI]

Studies of international economic development often feature the competitive gains from inter-firm cooperation. By cooperating, firms within a region can draw on their collective resources and experience to test out new ...

Lowe, Nichola J

2003-01-01T23:59:59.000Z

494

Refurbish power supply/distribution system Phase II. Progress status report No. 43, March 1, 1995--March 31, 1995  

SciTech Connect (OSTI)

This is a progress report detailing the schedules, accomplishments, and contract changes in the refurbishment of the Oak Ridge Y-12 plant power supply and distribution system.

NONE

1995-03-31T23:59:59.000Z

495

A Business Case for Home Performance Contracting  

SciTech Connect (OSTI)

This report was prepared by PNNL for the DOE Building America program. The report provides information for businesses considering entering the home performance contracting industry. Metrics discussed include industry trends and drivers, specific points of entry, business models, startup costs, and marketing strategies. The report includes detailed analysis of eight businesses around the country that have successfully entered the home performance contracting industry. Data is provided on their financial structures, program participation, marketing efforts, and staff training. This report will be distributed via the DOE Building America website, www.buildingamerica.gov. Individual case studies will also be cleared separately.

Baechler, Michael C.; Antonopoulos, Chrissi A.; Sevigny, Maureen; Gilbride, Theresa L.; Hefty, Marye G.

2012-10-01T23:59:59.000Z

496

Contraction of cross-linked actomyosin bundles  

E-Print Network [OSTI]

Cross-linked actomyosin bundles retract when severed in vivo by laser ablation, or when isolated from the cell and micromanipulated in vitro in the presence of ATP. We identify the time scale for contraction as a viscoelastic time tau, where the viscosity is due to (internal) protein friction. We obtain an estimate of the order of magnitude of the contraction time tau ~ 10-100 s, consistent with available experimental data for circumferential microfilament bundles and stress fibers. Our results are supported by an exactly solvable, hydrodynamic model of a retracting bundle as a cylinder of isotropic, active matter, from which the order of magnitude of the active stress is estimated.

Natsuhiko Yoshinaga; Philippe Marcq

2012-06-08T23:59:59.000Z

497

Legal Issues Involving Cash Forward Grain Contracts  

E-Print Network [OSTI]

States (though Louisiana has enacted only parts of the UCC). Article 2 of the UCC governs sales transactions. Application of UCC Article 2 to Contracts UCC Article 2 pertains to the sale of goods. ?Goods? includes all things that are movable, as well... that certain types of contracts be in writing. The writing requirement for sales of goods, in most states, is applicable only when the goods have a price of $500 or more. Under another provision of the UCC, there is an overall statute of frauds for every con...

McEowen, Roger A.

1999-06-23T23:59:59.000Z

498

ESPC IDIQ Contract | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPC IDIQ Contract Document displays a sample indefinite

499

Water-related planning and design at energy firms  

SciTech Connect (OSTI)

Water related planning and design at energy firms are examined. By identifying production alternatives and specifying the cost of these alternatives under a variety of conditions, one gains insight into the future pattern of water use in the energy industry and the response of industry to water-related regulation. In Part II, the three principal decisions of industry that affect water allocation are reviewed: where to build plants, where to get water, and how much water to use. The cost of water use alternatives is reviewed. Part III presents empirical data to substantiate the inferences derived from engineering/economic analysis. The source of water, type of cooling system, and pattern of discharge for electric plants constructed during the 1970s or projected to come on line in this decade are reported. In the 1970s in the US, there was a trend away from once-through cooling toward use of evaporative cooling. Freshwater, as a source of supply, and discharge of effluent were standard practice. In the 1980s, almost all new capacity in the states and basins surveyed will use evaporative cooling. It is pointed out that a thorough understanding of industrial water use economics and water markets is a precursor to successful regulation.

Abbey, D; Lucero, F

1980-11-01T23:59:59.000Z

500

Apple Maturity Protocol Tests for apple flesh firmness and starch conversion are important tools for monitoring crop  

E-Print Network [OSTI]

Apple Maturity Protocol Tests for apple flesh firmness and starch conversion are important tools for monitoring crop maturity. Flesh firmness, as measured with a pressure gauge, determines how long apples can adequate firmness for fresh market or processing uses. A second common assay for apple maturity