Sample records for financial transmission rights

  1. Advanced Computational Methods for Security Constrained Financial Transmission Rights

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Elbert, Stephen T.; Vlachopoulou, Maria; Zhou, Ning; Huang, Zhenyu

    2012-07-26T23:59:59.000Z

    Financial Transmission Rights (FTRs) are financial insurance tools to help power market participants reduce price risks associated with transmission congestion. FTRs are issued based on a process of solving a constrained optimization problem with the objective to maximize the FTR social welfare under power flow security constraints. Security constraints for different FTR categories (monthly, seasonal or annual) are usually coupled and the number of constraints increases exponentially with the number of categories. Commercial software for FTR calculation can only provide limited categories of FTRs due to the inherent computational challenges mentioned above. In this paper, first an innovative mathematical reformulation of the FTR problem is presented which dramatically improves the computational efficiency of optimization problem. After having re-formulated the problem, a novel non-linear dynamic system (NDS) approach is proposed to solve the optimization problem. The new formulation and performance of the NDS solver is benchmarked against widely used linear programming (LP) solvers like CPLEX™ and tested on both standard IEEE test systems and large-scale systems using data from the Western Electricity Coordinating Council (WECC). The performance of the NDS is demonstrated to be comparable and in some cases is shown to outperform the widely used CPLEX algorithms. The proposed formulation and NDS based solver is also easily parallelizable enabling further computational improvement.

  2. Essays on empirical analysis of multi-unit auctions -- impacts of financial transmission rights on the restructured electricity industry 

    E-Print Network [OSTI]

    Zang, Hailing

    2005-11-01T23:59:59.000Z

    This dissertation uses recently developed empirical methodologies for the study of multi-unit auctions to test the impacts of Financial Transmission Rights (FTRs) on the competitiveness of restructured electricity markets. FTRs are a special type...

  3. Advanced Computational Methods for Security Constrained Financial Transmission Rights: Structure and Parallelism

    SciTech Connect (OSTI)

    Elbert, Stephen T.; Kalsi, Karanjit; Vlachopoulou, Maria; Rice, Mark J.; Glaesemann, Kurt R.; Zhou, Ning

    2012-07-26T23:59:59.000Z

    Financial Transmission Rights (FTRs) help power market participants reduce price risks associated with transmission congestion. FTRs are issued based on a process of solving a constrained optimization problem with the objective to maximize the FTR social welfare under power flow security constraints. Security constraints for different FTR categories (monthly, seasonal or annual) are usually coupled and the number of constraints increases exponentially with the number of categories. Commercial software for FTR calculation can only provide limited categories of FTRs due to the inherent computational challenges mentioned above. In this paper, a novel non-linear dynamical system (NDS) approach is proposed to solve the optimization problem. The new formulation and performance of the NDS solver is benchmarked against widely used linear programming (LP) solvers like CPLEX™ and tested on large-scale systems using data from the Western Electricity Coordinating Council (WECC). The NDS is demonstrated to outperform the widely used CPLEX algorithms while exhibiting superior scalability. Furthermore, the NDS based solver can be easily parallelized which results in significant computational improvement.

  4. Point to Point and Flow-based Financial Transmission Rights: Revenue Adequacy and Performance Incen-

    E-Print Network [OSTI]

    Oren, Shmuel S.

    in electricity markets with locational marginal pricing (LMP) explaining the mechanics and fundamental for such in- struments are either Locational Marginal Prices (LMP) or shadow prices on transmission flowgates. e-mail: oren@ieor.berkeley.edu #12;2 pay, the nodal price difference between designated locations

  5. Transmission Right Of Way

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER...

  6. IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 19, NO. 2, MAY 2004 889 Congestion Management and Transmission Rights in

    E-Print Network [OSTI]

    Dixon, Juan

    and Transmission Rights in Centralized Electric Markets Roberto Méndez and Hugh Rudnick, Fellow, IEEE Abstract implementation unattractive. Index Terms--Congestion management, electric markets, nodal pricing, transmission by congestions in transmission lines. These rights can have physical or financial attributes

  7. Transmission rights and market power on electric power networks

    E-Print Network [OSTI]

    Joskow, Paul L.

    2000-01-01T23:59:59.000Z

    We analyze whether and how the allocation of transmission rights associated with the use of electric power networks affects the behavior of electricity generators and electricity consumers with market power. We consider ...

  8. Contingent Transmission Rights in the Standard Market Design

    E-Print Network [OSTI]

    Baldick, Ross

    (SMD), a market design in which congestion management is based on locational marginal pricing (LMP conditions such as availability and cost of energy at particular locations. In the transition to a single, transmission rights that provide an equivalent hedge against future locational congestion costs.1 The purpose

  9. SAP / Financial Program Sequence June 3, 2014 Johns Hopkins. All rights reserved.

    E-Print Network [OSTI]

    von der Heydt, Rüdiger

    SAP / Financial Program Sequence June 3, 2014 © Johns Hopkins. All rights reserved. Sponsored Projects E-Courses Intro to Sponsored Projects Business Ethics Training for Foreign Field Offices Effort Reporting System Admins Effort Reporting System Certifiers Effort Refresher for Certifiers

  10. Nodal Prices and Transmission Rights: a Critical Appraisal

    E-Print Network [OSTI]

    Varaiya, Pravin

    prices equal the marginal valuation of net benefits at different locations, they provide the right in a regulatory quagmire. #12; 2 I. Introduction Nodal prices, or locational spot prices, are a key instrument and abroad. In particular, we will demonstrate the pitfalls of using locational spot price differences

  11. Sun Life Assurance Company of Canada is a member of the Sun Life Financial group of companies. 2005 Sun Life Assurance Company of Canada. All rights reserved.

    E-Print Network [OSTI]

    Mullins, Dyche

    JL 5/26/09 Sun Life Assurance Company of Canada is a member of the Sun Life Financial group of companies. © 2005 Sun Life Assurance Company of Canada. All rights reserved. Sun Life Financial and the globe symbol are registered trademarks of Sun Life Assurance Company of Canada. SLPC 5302 07/02 H I G H

  12. EA-1629: Herbicide Application within Transmission Line Rights-of-Way in the Ozark-St. Francis National Forest, Arkansas

    Broader source: Energy.gov [DOE]

    The Department of the Interior, U.S. Forest Service, with DOE’s Southwestern Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of applying herbicide within transmission line rights-of-way in the Ozark-St. Francis National Forest in Arkansas. NOTE: SWPA's involvement in this EA has ended.

  13. The Efficiency of Point-to-Point Financial Transmission Rights is Limited by the Network Topology

    E-Print Network [OSTI]

    Blumsack, Seth

    Abstract: Many restructured electric power systems use the notion of locational marginal pricing (LMP) to optimally price network congestion. In order for market participants to hedge against volatile congestion model, relies on nodal prices to send signals to investors in a competitive environment. Price signals

  14. Power transmission investment analysis: a new financial Evaluation framework for South Africa

    SciTech Connect (OSTI)

    Maboke, Silky Ntombifuthi; Kachienga, Michael Ogembo

    2008-05-15T23:59:59.000Z

    A proposed framework for power transmission expansion projects in South Africa incorporates the modeling of project options and uncertainties, Monte Carlo simulations, real option analysis, and decision analysis, based on a foundation of strategic analysis. (author)

  15. October 2000 2000, Elsevier Science Inc., 1040-6190/00/$see front matter PII S1040-6190(00)00146-9 38 Flow-Based Transmission

    E-Print Network [OSTI]

    Oren, Shmuel S.

    -6190(00)00146-9 38 Flow-Based Transmission Rights and Congestion Management Combining the advantages of financial and physical rights, a flow-based transmission reservation approach facilitates liquidity and efficient risk decade, important issues remain unsettled concerning the best way to organize transmission to support

  16. EA-2002: Right-of-Way Application for the Tucson-Apache 115-kV Transmission Line, Pima County, Arizona

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) and the Bureau of Indian Affairs (BIA), as joint lead agencies, prepared an EA that evaluates the potential environmental impacts of a proposal for BIA to grant Western a 150-foot right-of-way across tribal land along the existing Tucson-Apache Transmission Line to replace the previous 100-foot right-of-way, which has expired.

  17. IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 20, NO. 1, FEBRUARY 2005 171 Dispatchable Transmission in RTO Markets

    E-Print Network [OSTI]

    Baldick, Ross

    .S. ISO/RTO markets.3 For our purposes, the core SMD elements include locational marginal pricing (LMP), flowgate marginal pricing (FMP), and financial transmission rights (FTRs).4 In addition, the SMD proposal to transmission. In the context of RTOs, marginal transmission pricing and uni

  18. Essays on empirical analysis of multi-unit auctions -- impacts of financial transmission rights on the restructured electricity industry

    E-Print Network [OSTI]

    Zang, Hailing

    2005-11-01T23:59:59.000Z

    -price, sealed-bid auctions. The first part of the dissertation studies the auctions on the spot market of the wholesale electricity industry. I derive structural empirical models to test theoretical predictions as to whether bidders fully internalize the effect...

  19. Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energy Zone Initiative

    E-Print Network [OSTI]

    Mills, Andrew

    2010-01-01T23:59:59.000Z

    based on existing transmission corridors or rights of way.The transmission costs also include right-of-way costs,

  20. Financial Networks Anna Nagurney

    E-Print Network [OSTI]

    Nagurney, Anna

    in decision-making; constraints on resources: human, financial, natural, time, etc.; global reach of many, Transmission Lines Water, Gas, Oil, Electricity Anna Nagurney Financial Networks #12;Interstate Highway System Freight Network World Oil Routes Natural Gas Flows Network Systems Internet Traffic Anna Nagurney

  1. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01T23:59:59.000Z

    S. S. Oren, “Smart flexible just-in-time transmission andFlexible Transmission in the Smart Grid By Kory WalterAll rights reserved. A BSTRACT Flexible Transmission in the

  2. FINANCIAL & BUSINESS SERVICES Financial & Business Services

    E-Print Network [OSTI]

    FINANCIAL & BUSINESS SERVICES Financial & Business Services Presidential Briefing #12;FINANCIAL & BUSINESS SERVICES Financial & Business Services (FBS) · FBS currently has approx. 140 employees · We) ­ Financial Solutions (6) ­ Travel, Training & Policy Development (6) #12;FINANCIAL & BUSINESS SERVICES Our

  3. power transmission network design by a greedy randomized ...

    E-Print Network [OSTI]

    of new transmission facilities should be installed, i.e. the ... whole, much more complex, power transmission network ..... 17 new rights of way (corridors).

  4. Financial Institutions

    Broader source: Energy.gov [DOE]

    A lending program begins with a financial institution that procures the funds they lend from a number of other sources.

  5. act chief financial: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Ecology Websites Summary: AUTHORIZATION TO RELEASE FINANCIAL INFORMATION The Family Educational Rights and Privacy Act (FERPA written consent from the student. By signing...

  6. Financial Opportunities

    Broader source: Energy.gov [DOE]

    Weatherization and Intergovernmental Program provides financial support and technical assistance to states, local governments, and municipal utilities through the projects it manages.

  7. Financial Literacy Effectiveness in Central Texas 

    E-Print Network [OSTI]

    Robinson, Lauren Pheriche

    2014-05-01T23:59:59.000Z

    literacy games (Visa 2013), and in-classroom settings for adults (Bauer et al. 2011) to name a few. Different audiences may have different financial goals, and their education should reflect that. Financial literacy should provide the right tools..., Shapiro, & Zia 2011). The knowledge component across different financial education courses is similar (Bauer et al. 2011; Braunstein & Welch 2002; Money Smart 2013; United States Department of the Treasury 2003). Savings, debt, and investing are shared...

  8. Transmission Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Return to Daylight Saving Time Posted: 2232015 Effective Date: 382015 This document provides the procedure for reserving and scheduling transmission that spans the time change...

  9. FINANCIAL & BUSINESS SERVICES Procurement &

    E-Print Network [OSTI]

    Tipple, Brett

    FINANCIAL & BUSINESS SERVICES Procurement & Payment Summary Accounts Payable Perry H. Hull #12;FINANCIAL & BUSINESS SERVICES Agenda · Accounts Payable: Who we are...what we do... · Accounts Payable;FINANCIAL & BUSINESS SERVICES Financial & Business Services #12;FINANCIAL & BUSINESS SERVICES Accounts

  10. Hybrid Transmission Corridor study

    SciTech Connect (OSTI)

    Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

    1992-06-01T23:59:59.000Z

    Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

  11. Essays in Financial Economics

    E-Print Network [OSTI]

    Shabani, Reza

    2012-01-01T23:59:59.000Z

    Journal of Financial Economics 92:66–91. [7] Chen, J. , H.G.Journal of Financial Economics 66:171–205. [8] Harrison,Journal of Financial Economics 66:207–239. [15] Keown,

  12. Financial Analysis

    Broader source: Energy.gov [DOE]

    The first step in financing a street lighting retrofit is a detailed financial analysis. Because street lighting systems are designed to last ten or twenty years, or even longer, all aspects of first costs, ongoing expenses, and long-term savings are important. While a preliminary or first-level analysis can be used to determine such things as simple payback, rate of return, and cost of light, the results may neglect a number of important economic considerations, such as the time value of money, additional savings and expenses and their relative timing, and future energy price escalations. Hence a first-level analysis does not typically provide the end user with sufficient details to make a fully informed decision. For this reason, the Illuminating Engineering Society (IES) recommends a full life cycle cost/benefit analysis (LCCBA).

  13. Financial Business Analyst

    Broader source: Energy.gov [DOE]

    The incumbent in this position will serve as a Financial Business Analyst in the Financial Information Systems organization of Finance. The incumbent is responsible for performing analytical and...

  14. A Transmission Control Framework Continuous Media

    E-Print Network [OSTI]

    Whitton, Mary C.

    Rights Reserved #12;ABSTRACT A Transmission Control Framework for Continuous Media (Under the directionA Transmission Control Framework for Continuous Media by Terry Michael Talley A dissertation by integrating real-time two-way audio and video with the computer system. Unfortunately, the quality of video

  15. Transmission Services J7000

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Business Unit - J7300 CRSP - DSW - RMR Open Access Transmission Tariff Management Transmission Service Requests Interconnection Requests OASIS...

  16. Solar Rights

    Broader source: Energy.gov [DOE]

    In June 2010, Louisiana enacted solar rights legislation (HB 751) that prohibits certain entities from unreasonably restricting a property owner from installing a solar collector. Solar collectors...

  17. Housing System Financial Statements

    E-Print Network [OSTI]

    Fernandez, Eduardo

    Housing System Financial Statements June 30, 2010 #12;FLORIDA ATLANTIC UNIVERSITY HOUSING SYSTEM's Housing Division's (Housing) financial performance provides an overview of the financial activities for the fiscal year ended June 30, 2010. Please read it in conjunction with Housing's financial statements

  18. Chief Financial Officer Responsibilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-11-21T23:59:59.000Z

    The Order sets forth requirements for operating the Department of Energy in full compliance with the Chief Financial Officers Act of 1990 and sets standards for sound financial management policies and practices, effective internal controls, accurate and timely financial information, and well-qualified financial managers. Cancels DOE O 520.1.

  19. Financial Management Oversight

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-08-31T23:59:59.000Z

    The Order defines requirements for effective financial management and adherence to DOE and applicable external financial management requirements and sets forth standards for ensuring the integrity and responsiveness of financial management and the accuracy and reliability of DOEs financial statements. Cancels DOE O 2200.13.

  20. Multifrequency Wilkinson Power Divider Using Microstrip Nonuniform Transmission Lines

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Multifrequency Wilkinson Power Divider Using Microstrip Nonuniform Transmission Lines Mohammad desired frequencies. The proposed structure contains two Microstrip Nonuniform Transmission Lines (MNTLs­6] and using composite right/left-handed transmission line (CRLH) [7]. The main disadvantage of multistage

  1. Transmission and Generation Investment In a Competitive Electric Power Industry

    E-Print Network [OSTI]

    California at Berkeley. University of

    .3 Transmission Property Rights and Congestion Contracts . . . . . . . . . . . . . . . . . 7 2.4 How TransmissionPWP-030 Transmission and Generation Investment In a Competitive Electric Power Industry James of California Energy Institute 2539 Channing Way Berkeley, California 94720-5180 www.ucei.berkeley.edu/ucei #12

  2. EIS-0390: Eastern Plains Transmission Project, Colorado and Kansas.

    Broader source: Energy.gov [DOE]

    This EIS is for Western Area Power Administration's proposal to participate with Tri-State Generation and Transmission Association, Inc. (Tri-State), to construct the proposed Eastern Plains Transmission Project (Project). Western’s participation with Tri-State would be in exchange for capacity rights on the transmission lines.

  3. Transmission INTRODUCTION

    E-Print Network [OSTI]

    , to a significant degree, on a well-functioning wholesale power market. The transmission system is integral the consequences of a poorly designed wholesale power market, and the Council does not want to see those Regulatory Commission began taking actions to further facilitate competition in wholesale power supply. Today

  4. Abstract--Different regulatory frameworks have implemented competitive mechanisms to increase efficiency in transmission, a

    E-Print Network [OSTI]

    Dixon, Juan

    developing the transmission project, and the optimal bilateral negotiation of right-of-way costs. We define of the right-of- way costs. In part two of this series we present two case studies: the IEEE 24-bus RTS. The second one is market-based and is associated with competition to award transmission rights, physical

  5. NWCC Transmission Case Study III

    SciTech Connect (OSTI)

    Terry Allison, Steve Wiese

    2000-03-01T23:59:59.000Z

    OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

  6. Essays in financial economics

    E-Print Network [OSTI]

    Severino Díaz, Felipe

    2014-01-01T23:59:59.000Z

    This thesis consists of three empirical essays in financial economics, examining the consequences of imperfect financial markets for households, small business and house prices. In the first chapter (co-authored with Meta ...

  7. Essays in Financial Economics

    E-Print Network [OSTI]

    Sohn, Sung Bin

    2012-01-01T23:59:59.000Z

    Journal of Financial Economics, 67, 149– Asquith, P. and D.Journal of Financial Economics, 15, 61–89. Back, K. and J.The Quarterly Journal of Economics, 113, 869–902. Blanchard,

  8. Standard Nine: Financial Resources

    E-Print Network [OSTI]

    Snider, Barry B.

    105 Standard Nine: Financial Resources Overview The 1996 NEASC team report was critical of Brandeis's financial management, and focused on the need to increase financial resources, improve faculty and staff displays the University resource profile for FY1995 compared to the FY2005 profile. During this decade

  9. Transmission Investment: A Primer

    SciTech Connect (OSTI)

    McGarvey, Joe

    2006-10-15T23:59:59.000Z

    This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

  10. Transmission Workshop

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23,EnergyChicopeeTechnologyfact sheetTransferring the Wayne,TRANSMISSION WORKSHOP

  11. Transmission Lines Emulating Moving Media

    E-Print Network [OSTI]

    Vehmas, Joni; Tretyakov, Sergei

    2014-01-01T23:59:59.000Z

    In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

  12. Colorado Electrical Transmission Grid

    SciTech Connect (OSTI)

    Zehner, Richard E.

    2012-02-01T23:59:59.000Z

    Citation Information: Originator: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Originator: Xcel Energy Publication Date: 2012 Title: Colorado XcelEnergy NonXcel Transmission Network Edition: First Publication Information: Publication Place: Earth Science & Observation Center, Cooperative Institute for Research in Environmental Science (CIRES), University of Colorado, Boulder Publisher: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Description: This layer contains transmission network of Colorado Spatial Domain: Extent: Top: 4540689.017558 m Left: 160606.141934 m Right: 758715.946645 m Bottom: 4098910.893397m Contact Information: Contact Organization: Earth Science &Observation Center (ESOC), CIRES, University of Colorado at Boulder Contact Person: Khalid Hussein Address: CIRES, Ekeley Building Earth Science & Observation Center (ESOC) 216 UCB City: Boulder State: CO Postal Code: 80309-0216 Country: USA Contact Telephone: 303-492-6782 Spatial Reference Information: Coordinate System: Universal Transverse Mercator (UTM) WGS’1984 Zone 13N False Easting: 500000.00000000 False Northing: 0.00000000 Central Meridian: -105.00000000 Scale Factor: 0.99960000 Latitude of Origin: 0.00000000 Linear Unit: Meter Datum: World Geodetic System ’1984 (WGS ’1984) Prime Meridian: Greenwich Angular Unit: Degree Digital Form: Format Name: Shapefile

  13. Electricity Transmission Congestion Costs: A Review of Recent Reports

    E-Print Network [OSTI]

    operator ISO-NE Independent System Operator - New England LMP Locational marginal price MW Megawatt MWh price FERC Federal Energy Regulatory Commission FTR Fixed transmission right ISO Independent system

  14. BPA, Transmission, I-5 Corridor Reinforcement Project factsheet...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transmission line route. The alternatives vary in length and amount of existing and new right-of-way they require. We will also consider a "no action" alternative, that is, not...

  15. Title 25 USC 3504 Leases, business agreements, and rights-of...

    Open Energy Info (EERE)

    Leases, business agreements, and rights-of-way involving energy development or transmission Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  16. civil rights

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved: 5-13-14Russian NuclearNational5/%2A en Office of Civil Rights

  17. Energy Transmission and Infrastructure

    SciTech Connect (OSTI)

    Mathison, Jane

    2012-12-31T23:59:59.000Z

    The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

  18. Financial and economic performance of long-rotation hardwood plantation investments in Queensland, Australia

    E-Print Network [OSTI]

    Venn, Tyron

    -economically justified in most Hardwood Regions, even though financial returns from timber production may be negative. D 2003 Elsevier B.V. All rights reserved. Keywords: Timber plantations; Ecosystem services; Financial communication).1 Forestry prospectus companies and the Queensland Depart- ment of Primary Industries (DPI

  19. WEYL ASYMPTOTICS OF THE TRANSMISSION EIGENVALUES ...

    E-Print Network [OSTI]

    2014-09-02T23:59:59.000Z

    plex internal transmission eigenvalues when the domain is a ball and the index ..... parameter in the operators in a non-linear way; and the implicit choice of the .... in the interior of I, and thus, q ?p ITEs in I, since we include the right endpoint in.

  20. Financial Networks Anna Nagurney

    E-Print Network [OSTI]

    Nagurney, Anna

    World Oil Routes Natural Gas Flows Network Systems Internet Traffic Anna Nagurney Financial Networks #12 Gothenburg University Gothenburg, Sweden and John F. Smith Memorial Professor Director ­ Virtual Center, 2012 School of Business, Economics and Law Gothenburg University, Sweden Anna Nagurney Financial

  1. Power Districts: Acquisition of Right-of-Way (Nebraska)

    Broader source: Energy.gov [DOE]

    This statute describes procedures for power districts (utilities, corporations, or municipalities that engage in the generation or transmission of electricity) to obtain a right-of-way for the...

  2. Test systems and mathematical models for transmission network expansion planning

    E-Print Network [OSTI]

    McCalley, James D.

    way the alternative models that are normally used for represent- ing a transmissions network$J, and .rjrepresent, respectivelythe cost of a circuit that can be added to right-of-way i-j, the susceptance of that circuit, the number of circuits added in right-of-way i-j,the number of circuits in the base case

  3. Three Essays on Financial Economics

    E-Print Network [OSTI]

    Qu, Haonan

    2011-01-01T23:59:59.000Z

    Journal of Financial Economics, February 2003, 67 (2), 217–Journal of Financial Economics, March 2008, 87 (3), 706–739.International Finance and Economics, 2008. Schiozer, Rafael

  4. Geothermal Technologies Office: Financial Opportunities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Financial Opportunities Printable Version Share this resource Send a link to Geothermal Technologies Office: Financial Opportunities to someone by E-mail Share Geothermal...

  5. Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

    2011-02-01T23:59:59.000Z

    The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

  6. Helping You Understand Financial Planning and Investments At a Glance

    E-Print Network [OSTI]

    Northern British Columbia, University of

    in the case of saving for retirement. As irrelevant as old age may seem right now, making one smart move today ­ and taking advantage of your employer-sponsored savings plan ­ could be the best decision you'll make in your expenses. As urgent as these financial demands may be, there are compelling reasons to save now: · Pay less

  7. Merchant transmission investment

    E-Print Network [OSTI]

    Joskow, Paul L.

    2003-01-01T23:59:59.000Z

    We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

  8. WHEN DOES FINANCIAL SECTOR (IN)STABILITY INDUCE FINANCIAL REFORMS?

    E-Print Network [OSTI]

    Boyer, Edmond

    WHEN DOES FINANCIAL SECTOR (IN)STABILITY INDUCE FINANCIAL REFORMS? Susie LEE Ingmar SCHUMACHER (in)stability induce financial reforms? Susie Lee1 Ingmar Schumacher2 October 26, 2011 Abstract The article studies whether financial sector (in)stability had an effect on reforms in the fi- nancial sector

  9. Financial Highlights: Annual Report 1987.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1988-02-01T23:59:59.000Z

    Federal Columbia River Power System for the fiscal year ended September 30, 1987. This report covers: Financial highlights; Letter to the Secretary; The Financial Year in Review; Power Sales; Meeting the Region's Power Needs; Building for the Future; Regional Operations; BPA, the Council and Fish; 50th Anniversary; New Headquarters Building; Energizing the Community; Financial Section; Auditor's Report; and Financial Statements.

  10. Welfare gains from financial liberalization

    E-Print Network [OSTI]

    Townsend, Robert

    Financial liberalization has been a controversial issue, as empirical evidence for growth enhancing

  11. Sudden Financial Arrest

    E-Print Network [OSTI]

    Caballero, Ricardo J.

    There are striking and terrifying similarities between the sudden failure of a heart and that of a financial system. In the medical literature, the former is referred to as sudden cardiac arrest. By analogy, I refer to its ...

  12. Essays in financial economics

    E-Print Network [OSTI]

    Edmans, Alex

    2007-01-01T23:59:59.000Z

    This thesis consists of three essays in financial economics. Chapter 1 is entitled "Inside Debt." Existing theories advocate the use of cash and equity in executive compensation. However, recent empirical studies have ...

  13. Corporate Governance, State-Contingent Control Rights, and Financial Distress

    E-Print Network [OSTI]

    Rasmussen, Robert K.

    2004-01-01T23:59:59.000Z

    20-6:00 pm, Boalt 13 Corporate Governance, State-ContingentRobert K. Rasmussen Corporate Governance, State-ContingentTraditional accounts of corporate governance focus on how

  14. A Near-Optimum Channel Access Protocol Based on Incremental Collision Resolution and Distributed Transmission Queues

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    to send compete for the right to be added to the data-transmission queue using a deterministic tree transmission queues can be started. A way to stabilize the system is by increasing the retransmission delays Transmission Queues Rodrigo Garc´es and J.J. Garcia-Luna-Aceves Computer Engineering Department School

  15. Do Generation Firms in Restructured Electricity Markets Have Incentives to Support Socially-Efficient Transmission Investments? *

    E-Print Network [OSTI]

    transmission rights (FTRs) by generation firms. We investigate the way in which the allocation of FTRs may-Efficient Transmission Investments? * Enzo E. Sauma a, ** , Shmuel S. Oren b a Industrial and Systems Engineering that generation firms have in restructured electricity markets for supporting long-term transmission investments

  16. Unleashing a Tiger: Financial Deregulation in Taiwan

    E-Print Network [OSTI]

    Bennett, Michael S.

    1992-01-01T23:59:59.000Z

    the movement toward financial deregulation that is occurringthe trend toward financial deregulation in Asia, see StevenA TIGER: FINANCIAL DEREGULATION IN TAIWAN Michael S.

  17. Supplement Analysis for the Transmission System Vegetation Management Program FEIS

    SciTech Connect (OSTI)

    N /A

    2001-03-27T23:59:59.000Z

    BPA proposes to clear unwanted vegetation from a section of BPA's Ponderosa--Pilot Butte Transmission Line Right-of-way to facilitate relocation of structure 18/3. Work would begin in mid-March and end in April, 2001. (1) Description of right-of-way and vegetation management needed--The project involves cutting all tall growing trees and brush within BPA's 100-foot wide transmission line right-of-way. An encroachment by the City of Bend Sewer Treatment facility, and future expansion plans, compelled the relocation of this portion of the right-of-way. Structures 18/2 and 18/4 will be modified in place to accommodate the new angle of the right-of-way. Structure 18/3 will be moved approximately 300 feet westerly to allow for the expansion of the sewer treatment facility. Only vegetation within the new portion of the right-of-way, totaling approximately 3.5 acres, will be controlled. No herbicides will be used on this project. Vegetation to be controlled: Juniper trees are the only tall growing tree species within this portion of the right-of-way requiring treatment. The density of vegetation within the new right-of-way is light to medium. The right-of-way boundaries will be examined for danger trees and if found, danger trees will be marked and cut according to danger tree policy.

  18. Transmission Commercial Project Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

  19. harvard university financial report

    E-Print Network [OSTI]

    that it is a realistic and affordable option. Education is fundamental to the future of individuals and the nation the president 3 financial highlights 8 annual report of the harvard management company 15 report of independent academic agenda. With an exceptionally strong leadership team now in place, planning is moving forward

  20. harvard university financial report

    E-Print Network [OSTI]

    -oriented long- term planning for Harvard's future in Allston, and started developing priorities for our coming the president 3 financial overview 8 message from the ceo of harvard management company 13 report of independent important investments in the University's future as we prepared to celebrate Harvard's 375th anniversary. We

  1. harvard university financial report

    E-Print Network [OSTI]

    portfolio earned an invest- ment return of 11.0% and had a year-end value of $27.6 billion. In the wake the president 3 financial overview 8 message from the ceo of harvard management company 14 report of independent;3 harvarduniversityfinancialoverview In its fiscal year ended June 30, 2010, the University made significant progress in managing

  2. FINANCIAL AID FOR LAW SCHOOL

    E-Print Network [OSTI]

    Kaminsky, Werner

    FINANCIAL AID FOR LAW SCHOOL: A PRELIMINARY GUIDE LSAC.org #12;INTRODUCTION Legal education education is the financial aid office (or the website) of any LSAC-member law school. LSAC.org provides links to many law schools as well as several good sources of financial aid information. The cost

  3. INTERNATIONAL STUDENT FINANCIAL DOCUMENTATION FORM

    E-Print Network [OSTI]

    Barrash, Warren

    INTERNATIONAL STUDENT FINANCIAL DOCUMENTATION FORM This form is not an application for financial assistance. This form is REQUIRED before we can provide immigration documents, even if your government, photocopied or faxed supporting financial documents. **List your name as it appears on your passport** Family

  4. INTERNATIONAL STUDENT FINANCIAL DOCUMENTATION FORM

    E-Print Network [OSTI]

    Barrash, Warren

    INTERNATIONAL STUDENT FINANCIAL DOCUMENTATION FORM Please complete this form if you this form and supporting financial documents after you have received your admissions decision. To receive will come from that source. Please attach supporting financial support documents that are less than six

  5. INTERNATIONAL STUDENT FINANCIAL DOCUMENTATION FORM

    E-Print Network [OSTI]

    Barrash, Warren

    INTERNATIONAL STUDENT FINANCIAL DOCUMENTATION FORM Please complete this form if you this form and supporting financial documents after you have received your admissions decision. To receive will come from that source. Please attach original supporting financial support documents, issued in English

  6. Automated manual transmission controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

    1999-12-28T23:59:59.000Z

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  7. Copyright 2001 All Rights Reserved Copyright 2001 All Rights Reserved

    E-Print Network [OSTI]

    Amaral, Luis A.N.

    Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights Reserved #12;Copyright © 2001

  8. Copyright 2001. All Rights Reserved. Copyright 2001. All Rights Reserved.

    E-Print Network [OSTI]

    Kuhl, Michael E.

    Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright

  9. Copyright 2001. All Rights Reserved. Copyright 2001. All Rights Reserved.

    E-Print Network [OSTI]

    Schultz, Ted

    Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright ©2001. All Rights Reserved. #12;Copyright

  10. Copyright 2000 All Rights Reserved Copyright 2000 All Rights Reserved

    E-Print Network [OSTI]

    Kari, Lila

    Copyright © 2000 All Rights Reserved #12;Copyright © 2000 All Rights Reserved #12;Copyright © 2000 All Rights Reserved #12;Copyright © 2000 All Rights Reserved #12;Copyright © 2000 All Rights Reserved #12;Copyright © 2000 All Rights Reserved #12;Copyright © 2000 All Rights Reserved #12;Copyright © 2000

  11. Copyright 1997. All rights reserved. Copyright 1997. All rights reserved.

    E-Print Network [OSTI]

    Bataillon, Thomas

    Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12;Copyright © 1997. All rights reserved. #12

  12. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

    2004-06-29T23:59:59.000Z

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  13. 2012 Transmission Rate Schedules

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Transmission, Ancillary, and Control Area Service Rate Schedules and General Rate Schedule Provisions (FY 2014-2015) October 2013 United States Department of Energy...

  14. Electric Transmission Lines (Nebraska)

    Broader source: Energy.gov [DOE]

    The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

  15. Patterns of transmission investment

    E-Print Network [OSTI]

    Joskow, Paul L.

    2005-01-01T23:59:59.000Z

    This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

  16. Collaborative Transmission Technology Roadmap

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    techniques, and tools to analyze data from power quality recorders Size-up demand response opportunities Transmission level monitoring with PMUs is not sufficient and needs to...

  17. Quantitative Financial Analysis of Alternative Energy Efficiency Shareholder Incentive Mechanisms

    SciTech Connect (OSTI)

    Cappers, Peter; Goldman, Charles; Chait, Michele; Edgar, George; Schlegel, Jeff; Shirley, Wayne

    2008-08-03T23:59:59.000Z

    Rising energy prices and climate change are central issues in the debate about our nation's energy policy. Many are demanding increased energy efficiency as a way to help reduce greenhouse gas emissions and lower the total cost of electricity and energy services for consumers and businesses. Yet, as the National Action Plan on Energy Efficiency (NAPEE) pointed out, many utilities continue to shy away from seriously expanding their energy efficiency program offerings because they claim there is insufficient profit-motivation, or even a financial disincentive, when compared to supply-side investments. With the recent introduction of Duke Energy's Save-a-Watt incentive mechanism and ongoing discussions about decoupling, regulators and policymakers are now faced with an expanded and diverse landscape of financial incentive mechanisms, Determining the 'right' way forward to promote deep and sustainable demand side resource programs is challenging. Due to the renaissance that energy efficiency is currently experiencing, many want to better understand the tradeoffs in stakeholder benefits between these alternative incentive structures before aggressively embarking on a path for which course corrections can be time-consuming and costly. Using a prototypical Southwest utility and a publicly available financial model, we show how various stakeholders (e.g. shareholders, ratepayers, etc.) are affected by these different types of shareholder incentive mechanisms under varying assumptions about program portfolios. This quantitative analysis compares the financial consequences associated with a wide range of alternative incentive structures. The results will help regulators and policymakers better understand the financial implications of DSR program incentive regulation.

  18. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28T23:59:59.000Z

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  19. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    None

    2011-01-01T23:59:59.000Z

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  20. Transmission Enhancement Technology Report

    E-Print Network [OSTI]

    of Existing Transmission 6 5. Potential New Equipment to Improve Transmission Capability 9 6. Potential New parties for the sites that should be studied as potential locations for new generation and to consult lignite and wind energy. " As per the requirements of the above-referenced Congressional direction

  1. Refinancing from a Financier's Perspective

    Energy Savers [EERE]

    Refinancing from a Financier's Perspective Hosted by: FEDERAL UTILITY PARTNERSHIP WORKING GROUP SEMINAR November 5-6, 2014 Cape Canaveral. Florida Why Invest in UESC Projects? *...

  2. 2013 Financial Review

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells, Wisconsin:Deployment ActivitiesAge Refining Air1, 2015 Financial Review:

  3. User Financial Account Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del SolStrengthening aTurbulence mayUndergraduateAbout UsUser2/20/13 User Financial

  4. Copyright 2005 The Financial Times Limited Financial Times (London, England)

    E-Print Network [OSTI]

    Copyright 2005 The Financial Times Limited Financial Times (London, England) July 11, 2005 Monday London Edition 1 SECTION: COMMENT; Pg. 19 LENGTH: 922 words HEADLINE: Hope and generosity can triumph, nudged the world closer to this prospect. With the backdrop of the bombs in London, the Gleneagles

  5. Abstract--Nondiscriminatory transmission services are an es-sential requirement of open access and constitute a basic premise

    E-Print Network [OSTI]

    Gross, George

    scheduling, locational marginal prices, congestion man- agement, congestion charges, financial transmission security coordinators [1] to the market-based methods using locational marginal prices (LMPs) and other of transmission congestion. In addi- tion, the GTSP solutions determine more appropriate locational marginal

  6. Transmission Cost Allocation Methodologies for Regional Transmission Organizations

    SciTech Connect (OSTI)

    Fink, S.; Rogers, J.; Porter, K.

    2010-07-01T23:59:59.000Z

    This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

  7. The Hybrid Power Flow Controller A New Concept for Flexible AC Transmission

    E-Print Network [OSTI]

    Lehn, Peter W.

    large and costly projects. Over the years, environmental, right­of­way, and cost prob- lems have delayedThe Hybrid Power Flow Controller A New Concept for Flexible AC Transmission Jovan Z. Bebic Electric flow controller topologies are proposed for flexible AC transmission systems (FACTS). The first one

  8. Montana State University 1 Financial Engineering

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    Spring EIND 354 - Engineering Probability and Statistics I 3 Professional Electives 3 ECNS 313Montana State University 1 Financial Engineering The Bachelor of Science in financial statistics and probability theory · Financial economics with a solid background in classical economic theory

  9. FINANCIAL RISK MANAGER (FRM ) CERTIFICATION

    E-Print Network [OSTI]

    Chaudhuri, Sanjay

    Dec 2013 (Save 30%) (Save 15%) Module 1 Foundation of Risk Management & Quantitative Analysis 1086FINANCIAL RISK MANAGER (FRM® ) CERTIFICATION TRAINING PROGRAM 2014 JANUARY INTAKE 4 January to 10 1321 1552 Module 2 Financial Markets and Products & Valuation and Risk Models 1637 1985 2333 Module 3

  10. The Econometrics of Financial Markets

    E-Print Network [OSTI]

    Landweber, Laura

    The Econometrics of Financial Markets John Y. Campbell, Andrew W. Lo, and A. Craig Mac, in a review of The Econometrics of Financial Markets, winner of TIAA-CREF's 1997 Paul A. Samuelson AwardKinlay's The Econometrics of Finan- cial Markets made a bold leap forward by integrating theory and empirical work

  11. Personal Financial Harvard Medical School

    E-Print Network [OSTI]

    Paulsson, Johan

    / shareholders #12;Knowledge "Education is the most powerful weapon which you can use to change the world [and behavior Understanding why we buy what we buy can help us make smart decisions in the future #12;Financial you the most in making progress toward your financial goals? Impulse buying Unplanned spending

  12. Designing electricity transmission auctions

    E-Print Network [OSTI]

    Greve, Thomas; Pollitt, Michael G.

    2012-10-26T23:59:59.000Z

    The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

  13. Transmission Services Bulletin

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Standard Time On the first Sunday in November Transmission Services sets clocks from Daylight Savings Time (PD) back to Standard Time (PS). At 02:00 the time becomes 01:00. In...

  14. Downhole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

    2008-01-15T23:59:59.000Z

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

  15. Electric Transmission Lines (Iowa)

    Broader source: Energy.gov [DOE]

    Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

  16. Down hole transmission system

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

    2007-07-24T23:59:59.000Z

    A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

  17. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01T23:59:59.000Z

    Planning . 102 vi Transmission Line Maintenance Scheduling 103 Just-in-time Transmission 103 Flexible Transmission in the Smart Grid

  18. Honda Transmission Technical Center

    High Performance Buildings Database

    Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

  19. Bulk Power Transmission Study

    E-Print Network [OSTI]

    John, T.

    BULK POWER TRANSMISSION STUDY TOMMY JOH~ P. E. Manager of Resource Recovery Waste Management of North America, Inc. Houston, Texas Texans now have a choice. We can become more efficient and maintain our standard of living, or we can... continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled...

  20. The year in review: Electric transmission

    SciTech Connect (OSTI)

    Hebert, C. Jr.

    1999-12-01T23:59:59.000Z

    This writing and the comments contained herein support the conclusion that mandating a solution to transmission woes is not the proper choice. Even if it were the right choice, it would not be the way to go. FERC exists in a sophisticated energy world and must comprehend that without the help of the energy industry it is doomed to fail. Technology changes, economies change, and even the FERC itself changes, and will again. This is all part of the energy journey. RTOs, pools, ISOs, RTOs, and, yes, Transcos are a part of the evolution of energy regulation and perhaps deregulation to some degree.

  1. Essays in macroeconomics : information and financial markets

    E-Print Network [OSTI]

    Iovino, Luigi

    2012-01-01T23:59:59.000Z

    This thesis studies how information imperfections affect financial markets and the macroeconomy. Chapter 1 considers an economy where investors delegate their investment decisions to financial institutions that choose ...

  2. Border flow rights and Contracts for differences of differences

    E-Print Network [OSTI]

    Baldick, Ross

    marginal price for energy that it delivers to the rest of the system and pays the locational marginal price analogously to "contracts for differences" (CFDs) that are used to hedge locational marginal price variation implementation of the border flow rights model, the owner of a transmission line or lines is paid the locational

  3. EA-1697: San Joaquin Valley Right-of-Way Project, California

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of right-of-way maintenance (including facility inspection and repair, vegetation management, and equipment upgrades for transmission lines and associated rights-or-way, access roads, substations, and a maintenance facility) in the San Joaquin Valley in California.

  4. Financial Statements 2009-10 55 Financial Statements

    E-Print Network [OSTI]

    Burton, Geoffrey R.

    2009-102 Placement Opportunities in the Faculty of Engineering and Design Financial Statements of sterling and the excellent reputation of both the University and the UK HE Sector have supported

  5. Solar Easements and Rights Laws

    Broader source: Energy.gov [DOE]

    In Missouri, the right to utilize solar energy is a property right, but eminent domain may not be used to obtain such property rights. Easements obtained for the purpose of construction,...

  6. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27T23:59:59.000Z

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  7. Office of Chief Financial Officer

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-01-19T23:59:59.000Z

    This Order implements the provisions of the Chief Financial Officers Act of 1990 within the Department of Energy. Cancels SEN 34-91. Canceled by DOE O 520.1A.

  8. ANNUAL FINANCIAL REPORT Queen's University

    E-Print Network [OSTI]

    Abolmaesumi, Purang

    .............................................................................................. i The year in review ...............................................14 #12;Queen's University at Kingston - Annual Financial Report - September, 1999 · 1 THE YEAR IN REVIEW 1995 1996 1997 1998 1999 0 100 200 300 400 500 All Other Tuition Fees Government Grants

  9. Community Development Financial Institutions Fund

    Broader source: Energy.gov [DOE]

    The U.S. Department of Treasury is accepting applications on the Community Development Financial Institutions (CDFI) Fund, which has opened the fiscal year 2015 funding round for the CDFI Program...

  10. Financial Economies With Restricted Participation

    E-Print Network [OSTI]

    Aouani, Zaier

    2009-05-18T23:59:59.000Z

    ), Duffie and Shafer (1985) and Magill and Quinzii (1996). Financial economies with incomplete markets assume (in general) a symmetric participation structure, i.e. each consumer is confronted with the same restrictions on her portfolio trades. This is a...

  11. Financial crisis : through various perspectives

    E-Print Network [OSTI]

    Kim, Joon Hee

    2010-01-01T23:59:59.000Z

    The 2007 financial crisis can be viewed from various perspectives. First, it can be explained in a wider macroeconomic context, for example by looking at the housing bubble. Monetary policy can be explained according to ...

  12. Essays on financial market imperfections

    E-Print Network [OSTI]

    Wu, Ding, Ph. D. Massachusetts Institute of Technology

    2007-01-01T23:59:59.000Z

    This dissertation consists of three chapters on financial market imperfections, in particular, information imperfections. Chapter 1 studies how the existence of a fixed cost per transaction faced by uninformed investors ...

  13. Low Frequency Transmission Final Project Report

    E-Print Network [OSTI]

    to HVDC transmission and conventional AC transmission in different configurations. The issue is quite

  14. Water Rights (Texas)

    Broader source: Energy.gov [DOE]

    The Texas Commission on Environmental Quality regulates the water rights for the state of Texas. Water and state water may be appropriated, stored, or diverted in the state of Texas for beneficial...

  15. Copyright 2001 All Rights ReservedCopyright 2001 All Rights ReservedCopyright 2001 All Rights Reserved Copyright 2001 All Rights ReservedCopyright 2001 All Rights ReservedCopyright 2001 All Rights Reserved

    E-Print Network [OSTI]

    Troyer, Todd W.

    Copyright © 2001 All Rights ReservedCopyright © 2001 All Rights ReservedCopyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights ReservedCopyright © 2001 All Rights ReservedCopyright © 2001 All Rights Reserved #12;Copyright © 2001 All Rights ReservedCopyright © 2001 All Rights Reserved

  16. Performance Incentives for Transmission

    E-Print Network [OSTI]

    Oren, Shmuel S.

    ) establishes a framework for markets based on locational marginal pricing (LMP). The NOPR envisions a critical role for congestion rev- enue rights (CRRs), which entitle holders to streams of nodal price, because the extent and location of congestion in LMP-based markets is transparent. Incentive regulation

  17. Do Generation Firms in Restructured Electricity Markets Have Incentives to Support Social-Welfare-Improving Transmission Investments? *

    E-Print Network [OSTI]

    on locational marginal prices for energy to price and manage congestion and to signal the need for economically of the capacity) in the context of nodal pricing systems. They suggest a transmission rights allocation

  18. Nest predation, predator abundance, and avian diversity in transmission line corridors and adjacent habitats in east central Texas

    E-Print Network [OSTI]

    Hubbard, Tani Ann

    2000-01-01T23:59:59.000Z

    Transmission line corridors and other types of rights-of-way (ROW) are narrower and more continuous than other types of disturbances and, therefore, result in a proportionately higher amount of "edge" in the vegetation types they bisect. These ROW...

  19. Omega Transmission Lines

    E-Print Network [OSTI]

    Vehmas, Joni

    2013-01-01T23:59:59.000Z

    In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

  20. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1993-03-23T23:59:59.000Z

    A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  1. Borehole data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

    1993-01-01T23:59:59.000Z

    A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

  2. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

    1997-01-01T23:59:59.000Z

    A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

  3. Autonomous data transmission apparatus

    DOE Patents [OSTI]

    Kotlyar, O.M.

    1997-03-25T23:59:59.000Z

    A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

  4. GLOBAL FINANCIAL CONDITION: PREDICTIONS FOR 2015 | OpenEI Community

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump1946865°, -86.0529604°Wisconsin:FyreStormGLOBAL FINANCIAL CONDITION:

  5. Threats to financial system security

    SciTech Connect (OSTI)

    McGovern, D.E.

    1997-06-01T23:59:59.000Z

    The financial system in the United States is slowly migrating from the bricks and mortar of banks on the city square to branch banks, ATM`s, and now direct linkage through computers to the home. Much work has been devoted to the security problems inherent in protecting property and people. The impact of attacks on the information aspects of the financial system has, however, received less attention. Awareness is raised through publicized events such as the junk bond fraud perpetrated by Milken or gross mismanagement in the failure of the Barings Bank through unsupervised trading activities by Leeson in Singapore. These events, although seemingly large (financial losses may be on the order of several billion dollars), are but small contributors to the estimated $114 billion loss to all types of financial fraud in 1993. Most of the losses can be traced to the contribution of many small attacks perpetrated against a variety of vulnerable components and systems. This paper explores the magnitude of these financial system losses and identifies new areas for security to be applied to high consequence events.

  6. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

    2006-03-28T23:59:59.000Z

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  7. Transmission line: design manual

    SciTech Connect (OSTI)

    Farr, H.H.

    1980-01-01T23:59:59.000Z

    The purpose of this manual is to outline the various requirements for, and the procedures to be followed in the design of power transmission lines by the Bureau of Reclamation, US Department of the Interior. Numerous design studies, which have been made on specific aspects of transmission line design, are included with explanations of their applications. Information is presented concerning such aspects as selection of type of construction, conductor sags and tensions, insulation, lightning protection, clearance patterns, galloping conductors, structure limitation and guying charts, and structure spotting. Structure design examples are limited to wood-pole construction. Interpretations of the National Electrical Safety Code and other codes are made as required. Some of the example problems were developed when the sixth edition of NESC was current, and are so noted; however, most examples use the 1977 edition of NESC.

  8. ash financial aspects: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    > MyUCDavis portal available to PI to access financial information any time > Monitor budget and administer the financial Schladow, S. Geoffrey 76 Financial Policy Manual...

  9. Patterns of Transmission Investment

    E-Print Network [OSTI]

    Joskow, Paul

    2006-03-14T23:59:59.000Z

    while providing imperfect protection against abusive self-dealing behavior by the TSO. The creation of truly independent TSOs reduces the regulatory burdens and creates entities whose management focuses on the transmission business. 15... of physical components that are to be added to the network or to replace components that are already in the network. They include: a. new relays and switches b. new remote monitoring and control equipment c. transformer upgrades d. substation...

  10. Geothermal Resources and Transmission Planning

    Broader source: Energy.gov [DOE]

    This project addresses transmission-related barriers to utility-scale deployment of geothermal electric generation technologies.

  11. Boardman to Hemingway Transmission Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

  12. Transmission Issues Policy Steering Committee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Business Practices CommitteesTeams Joint Operating Committee Transmission Issues Policy Steering Committee Customer Training Interconnection Notices Rates Standards of...

  13. 560 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 16, NO. 3, AUGUST 2001 A Mixed Integer Disjunctive Model for Transmission

    E-Print Network [OSTI]

    McCalley, James D.

    , called rights-of-way. The linearized power flow model is com- posed of Kirchoff's first and second laws Model for Transmission Network Expansion Laura Bahiense, Gerson C. Oliveira, Mario Pereira, Member, IEEE of the transmission network expansion problem cannot guarantee finding the optimal solution due to its nonconvex

  14. Money Matters for Students Financial Aid & Student Financial Services

    E-Print Network [OSTI]

    Ronquist, Fredrik

    website at: www.financialaid.fsu.edu Google Search Send private scholarships to Student Financial Services, include: FSUSN Terms of Scholarship #12;Bright Futures Academic Scholarship Maintain a 3.0 cumulative GPA: Week 1: We enter Prepaid Billing on Blackboard Week 4: We Bill Prepaid Week 6-8: Prepaid remits payment

  15. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

  16. Financial Services Division of Administration & Finance

    E-Print Network [OSTI]

    de Lijser, Peter

    Financial Services Division of Administration & Finance (657) 278-2512 / Fax (714) 278: May Wong / Financial Services (CP-300). Instructions are at Questions? Email Directive11@fullerton.eduwww.finance

  17. Kuali Financial System Implementation Collector Interface Meeting

    E-Print Network [OSTI]

    Stephens, Graeme L.

    Kuali Financial System Implementation Collector Interface Meeting December 17, 2008 Presenters of the Kuali Financial System (KFS) Collector Interface Format Differences from FRS Answer your questions #12 Collector File collector

  18. Financial Policy Manual RISK MANAGEMENT POLICIES

    E-Print Network [OSTI]

    Plotkin, Joshua B.

    Financial Policy Manual Page 1 RISK MANAGEMENT POLICIES 2601 Departmental Scope & Responsibility;Financial Policy Manual Page 1 2601 DEPARTMENTAL SCOPE & RESPONSIBILITY Subject: Risk Management & Insurance Effective: December 1986 Revised: May 2011 Last Reviewed: March 2014 Resp. Office: Risk Management

  19. Technology innovation in financial services industry

    E-Print Network [OSTI]

    Roxo da Fonseca, Gustavo J. C. (Gustavo José Costa), 1967-

    2004-01-01T23:59:59.000Z

    Over the last few decades, we have seen an enormous evolution in the financial services industry driven by technology innovations. Indeed, we cannot imagine the current financial system without electronic fund transfers, ...

  20. FINANCIAL INFORMATION SERVICES WWEEBB QQUUIICCKK TTIIPPSSOCTOBER 2006

    E-Print Network [OSTI]

    FINANCIAL INFORMATION SERVICES WWEEBB QQUUIICCKK TTIIPPSSOCTOBER 2006 Security to Web Applications How do I obtain security access to... Financial Information Library (FIL) Security is different for each Information Extract. To find security requirements, click on Details next to the Information

  1. Automated manual transmission clutch controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

    1999-11-30T23:59:59.000Z

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  2. A selective overview of nonparametric methods in financial econometrics

    E-Print Network [OSTI]

    Fan, Jianqing

    A selective overview of nonparametric methods in financial econometrics Jianqing Fan Department a brief overview on the nonparametric techniques that are useful for financial econometric problems, securities regulation, proprietary trading, financial consulting and risk management. Financial econometrics

  3. Essays on the Financial Crisis and Globalization

    E-Print Network [OSTI]

    Singh, Nirvikar

    2009-01-01T23:59:59.000Z

    heart of the argument is that markets are not inherently stable and do not Essays on the Financial Crisis and

  4. Annual Confidential Financial Disclosure Report (OGE 450)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-10-01T23:59:59.000Z

    This Notice addresses Executive Branch confidential financial disclosure requirements. These requirements apply to career GS (GM) employees.

  5. Summer 11 Adjustment Form Financial Aid Office

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    : ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ I certify that I have read and understand the requirements outlined on the Financial Aid web site

  6. Annual Confidential Financial Disclosure Report (OGE 450)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-10-01T23:59:59.000Z

    This Notice addresses Executive Branch confidential financial disclosure requirements. These requirements apply to career GS (GM) employees.

  7. PRINCETON UNIVERSITY FINANCIAL AID INFORMATION

    E-Print Network [OSTI]

    PRINCETON UNIVERSITY FINANCIAL AID INFORMATION SUMMER SCHOOL EXPENSES SUMMER 2014 Currently enrolled Princeton undergraduates who will be attending summer school may qualify for a University loan listing the cost of tuition. Funding for Princeton Programs Information about campus and external funding

  8. Administration and Finance Financial Services

    E-Print Network [OSTI]

    de Lijser, Peter

    Administration and Finance Financial Services P.O. Box 6808, Fullerton, CA 92834 / T 657. Jenkins Associate Vice President of Finance SUBJECT: Finance System Oracle Upgrade The CSUF Finance System is scheduled for an Oracle upgrade in September 2009. The CMS Finance System will be unavailable beginning

  9. Transmission - Contact Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del SolStrengthening a solidSynthesisAppliances » DataContact-Information-Transmission

  10. Transmission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-f <MaintainedInformationThePtyTownTrama TecnoTransmission

  11. Transmission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga, Indiana (Utility Company) JumpTradeWindPrepared asTransmission

  12. Multimode circuit QED with hybrid metamaterial transmission lines

    E-Print Network [OSTI]

    Daniel J. Egger; Frank K. Wilhelm

    2013-11-07T23:59:59.000Z

    Quantum transmission lines are a central to superconducting and hybrid quantum computing. Parallel to these developments are those of left-handed meta-materials. They have a wide variety of applications in photonics from the microwave to the visible range such as invisibility cloaks and perfect flat lenses. For classical guided microwaves, left-handed transmission lines have been proposed and studied on the macroscopic scale. We combine these ideas in presenting a left-handed/right-handed hybrid transmission line for applications in quantum optics on a chip. The resulting system allows circuit QED to reach a new regime: multi-mode ultra-strong coupling. Out of the many potential applications of this novel device, we discuss two; the preparation of multipartite entangled states and its use as a quantum simulator for the spin-boson model where a quantum phase transition is reached up to finite size-effects.

  13. Financial Exclusion &Financial Exclusion & Poverty in Canada:Poverty in Canada

    E-Print Network [OSTI]

    Martin, Jeff

    Financial Exclusion &Financial Exclusion & Poverty in Canada:Poverty in Canada: A Research Project Buckland, PhD Menno Simons CollegeMenno Simons College #12;2 J. Buckland: Fin Excl & Poverty in Canada Plan: Fin Excl & Poverty in Canada IntroductionIntroduction The Financial Exclusion andThe Financial

  14. Financial Aid Standards for SAP Page 1 Financial Aid Standards for

    E-Print Network [OSTI]

    Leistikow, Bruce N.

    funding. If a student does not meet the standards of academic progress, he/she will not be eligibleFinancial Aid Standards for SAP Page 1 Financial Aid Standards for Satisfactory Academic Progress Affects Your Financial Aid Eligibility Updated February 2012 #12;Financial Aid Standards for SAP Page 2

  15. SAMUDRA REPORT NO. 51 The Right Form of Rights

    E-Print Network [OSTI]

    Charles, Anthony

    locations; and the need to link fishing rights with This commentary is by Anthony T Charles (tony.charles@smu

  16. Trading Away Financial Stability in Colombia

    E-Print Network [OSTI]

    Tufts University

    Trading Away Financial Stability in Colombia: Capital Controls and the US-Colombia Trade Agreement@bu.edu #12;Trading Away Financial Stability in Colombia: Capital Controls and the US-Colombia Trade Agreement SerieBrief # 66 | Abril 2011 Trading Away Financial Stability in Colombia: Capital Controls and the US-Colombia

  17. financial report International Business Machines Corporation

    E-Print Network [OSTI]

    of Management 50 Report of Independent Accountants 51 Management Discussion 52 Consolidated Financial Statements Earnings 64 Financial Position 65 Stockholders' Equity 66 Cash Flows 68 Notes to Consolidated Financial Statements A Significant Accounting Policies 69 B Accounting Changes 71 C Common Stock Split 72 D

  18. BYU Salt Lake Center Financial Aid Program

    E-Print Network [OSTI]

    Martinez, Tony R.

    BYU Salt Lake Center Financial Aid Program 2011 A financial aid program of the Brigham Young University Division of Continuing Education BYU Salt Lake Center 345 West North Temple Street 3 Triad Center Salt Lake City, UT 84180 Fax: (801) 933­9456 Email: slc@byu.edu #12;BYU Salt Lake Center Financial Aid

  19. BYU Salt Lake Center Financial Aid Program

    E-Print Network [OSTI]

    Olsen Jr., Dan R.

    BYU Salt Lake Center Financial Aid Program 2013 A financial aid program of the Brigham Young University Division of Continuing Education BYU Salt Lake Center 345 West North Temple Street 3 Triad Center Salt Lake City, UT 84180 Fax: (801) 933­9456 Email: slc@byu.edu #12;BYU Salt Lake Center Financial Aid

  20. BYU Salt Lake Center Financial Aid Program

    E-Print Network [OSTI]

    Hart, Gus

    BYU Salt Lake Center Financial Aid Program 2014 A financial aid program of the Brigham Young University Division of Continuing Education BYU Salt Lake Center 345 West North Temple Street 3 Triad Center Salt Lake City, UT 84180 Fax: (801) 933­9456 Email: slc@byu.edu #12;BYU Salt Lake Center Financial Aid

  1. BYU Salt Lake Center Financial Aid Program

    E-Print Network [OSTI]

    Hart, Gus

    BYU Salt Lake Center Financial Aid Program 2012 A financial aid program of the Brigham Young University Division of Continuing Education BYU Salt Lake Center 345 West North Temple Street 3 Triad Center Salt Lake City, UT 84180 Fax: (801) 933­9456 Email: slc@byu.edu #12;BYU Salt Lake Center Financial Aid

  2. Job Dislocation Making Smart Financial Choices

    E-Print Network [OSTI]

    Job Dislocation Making Smart Financial Choices after a Job Loss #12;Who We Are FINRA FINRA.workforceatm.org. #12;Job Dislocation MAKING SMART FINANCIAL CHOICES AFTER A JOB LOSS You may not be able to control in the event of unemployment; protect yourself when getting financial advice during a period of job dislocation

  3. Office of the Assistant General Counsel for Procurement and Financial...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Financial Assistance Regulations: Federal Acquisition Regulation Department of Energy Acquisition Regulation Department of Energy Financial Assistance Regulations Office...

  4. Manual transmission shift linkage

    SciTech Connect (OSTI)

    Sewell, J.S.

    1991-10-01T23:59:59.000Z

    This patent describes a sliding gear manual transmission (10) for an automotive vehicle including a transmission housing (11), an input shaft (12) journalled in the housing, an output shaft (13) axially aligned with the input shaft and journalled in the housing, a countershaft (15) journalled in the housing and carrying a cluster gear (17) thereon, the input shaft (12) terminating in an input gear (14), a plurality of gears (26,27,28,29,31,31) on the output shaft (13) in meshing engagement with the cluster gear (17), and a plurality of synchronizing clutches (36,38,41,42) on the output shaft and countershaft for engagement of gear ratios of the meshing gears, and an axially movable and rotatable shift rail (81) located in the housing and operatively connected to a shift lever (82) actuated by the vehicle operator, the improvement comprising an auxiliary shift rail (98) located in the housing (11) generally paralleling the first mentioned shift rail (81) to provide for actuation of fifth, sixth and reverse gears the auxiliary shift rail (98) having a 5-6 shift arm (104) journalled thereon for axial movement relative thereto, and a reverse shift arm (99) rotatably mounted thereon for axial movement therewith.

  5. Factors influencing quantitative liquid (scanning) transmission...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Factors influencing quantitative liquid (scanning) transmission electron microscopy. Factors influencing quantitative liquid (scanning) transmission electron microscopy. Abstract:...

  6. Mineral Rights and Proceeds (Nebraska)

    Broader source: Energy.gov [DOE]

    This section contains provisions which determine when mineral rights are presumed to be abandoned by property owners.

  7. EIS-0450: TransWest Express Transmission Project in Wyoming, Colorado, Utah, and Nevada

    Broader source: Energy.gov [DOE]

    This EIS, prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the potential environmental impacts of granting a right-of-way for the TransWest Express Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project.

  8. Rights of Way Pesticide Training

    E-Print Network [OSTI]

    Ishida, Yuko

    Rights of Way Pesticide Training This class will provide informa on for people doing Rights of Way than 5 business days prior to training by 5:00PM. LATE CANCELLATIONS = NO REFUNDS ~ NO CREDITS ~ NO ROLLING FORWARD ~ NO EXCEPTIONS. The SBE Training Center reserves the right to cancel class due to low

  9. Kidney Health Eating Right for

    E-Print Network [OSTI]

    Bandettini, Peter A.

    . Your health care provider will use lab tests to watch your levels. STEP 4 Choose foods with lessKidney Health Eating Right for National Kidney Disease Education Program Tips for People. #12; THE FIRST STEPS TO EATING RIGHT Eating Right for Kidney Health STEP

  10. Transmission Planning | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Improving Performance of Federal Permitting and Review of Infrastructure Projects Energy Corridors on Federal Lands Transmission Projects Proposed Under EPAct Section 1222 Activity...

  11. AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION

    Broader source: Energy.gov [DOE]

    The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

  12. EPA's Financial and Technical Resources

    E-Print Network [OSTI]

    Perea, S. M.

    2011-01-01T23:59:59.000Z

    EPA?s Financial and Technical Resources Suzanna M. Perea, EPA Region VI CATEE Conference November 9, 2011 EPA?s Primary Role Where and how communities are built has a major impact on the environment and on public health. Many programs... are aimed at supporting activities that build more sustainable communities. Protecting Human Health and the Environment Smart Growth Implementation Assistance (SGIA) Grants http://www.epa.gov/smartgrowth/sgia.htm Building Blocks Technical...

  13. Raj JainThe Ohio State University Data TransmissionData TransmissionData Transmission

    E-Print Network [OSTI]

    Jain, Raj

    The Ohio State University 2-14 Bit Error RateBit Error RateBit Error Rate Energy/bit Eb =STb, where TbRaj JainThe Ohio State University 2-1 Data TransmissionData TransmissionData Transmission Raj Jain Professor of CIS The Ohio State University Columbus, OH 43210 Jain@ACM.Org http://www.cis.ohio

  14. Civil Rights EEO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWPSuccessAlamosCharacterization ofChemistryChristopherCivil-Rights-EEO

  15. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

    1997-04-01T23:59:59.000Z

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  16. Direct current power transmission systems

    SciTech Connect (OSTI)

    Padiyar, K.R.

    1991-01-01T23:59:59.000Z

    This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

  17. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    Wind Energy Access, Transmission, and Intermittency Really Cost?transmission cost barrier for wind energy. A secondary goalfocus on the cost of transmission for wind energy does not

  18. EC Transmission Line Materials

    SciTech Connect (OSTI)

    Bigelow, Tim S [ORNL

    2012-05-01T23:59:59.000Z

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  19. Key-shift transmission

    SciTech Connect (OSTI)

    Nemoto, S.

    1989-03-07T23:59:59.000Z

    A key-shift transmission is described, characterized by the speed-change shaft being divided into a pair of trough-shaped shaft halves each having an arched inner surface which defines a part of a cylindrical bore extending axially through the speed-change shaft thereby the shaft being formed into a hollow shaft, and by each of the shaft halves including a pair of flattened end surfaces which extend axially of each shaft half at both sides of the inner surface, one of the end surfaces having thereon an axially elongated projection and the other of the end surfaces having herein an axially elongated recess of a depth smaller than the height of the projection. The pair of shaft halves are engaged to each other co-rotatably by fitting the projections of the respective shaft halves into the recesses of the respective shaft halves so as to form in an outer surface of the speed-change shaft a pair of elongated axial grooves which are located radially outwardly of the elongated projections of the respective shaft halves and between the flattened end surfaces of the respective shaft halves. A pair of the shift keys are disposed within the pair of elongated axial grooves.

  20. Regional Transmission Projects: Finding Solutions

    SciTech Connect (OSTI)

    The Keystone Center

    2005-06-15T23:59:59.000Z

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

  1. Copyright 2003 The Financial Times Limited Financial Times (London,England)

    E-Print Network [OSTI]

    Copyright 2003 The Financial Times Limited Financial Times (London,England) October 15, 2003, Wednesday London Edition 1 SECTION: COMMENT; Pg. 21 LENGTH: 1116 words HEADLINE: The world must not let

  2. Copyright 1999 The Financial Times Limited Financial Times (London,England)

    E-Print Network [OSTI]

    Copyright 1999 The Financial Times Limited Financial Times (London,England) May 5, 1999, Wednesday LONDON EDITION 1 SECTION: COMMENT & ANALYSIS; Pg. 24 HEADLINE: A cure for indifference PERSONAL VIEW

  3. Financial analysis of experimental releases conducted at Glen Canyon Dam during water year 2011

    SciTech Connect (OSTI)

    Poch, L. A.; Veselka, T. D.; Palmer, C. S.; Loftin, S.; Osiek, B. (Decision and Information Sciences); (Western Area Power Administration)

    2012-07-16T23:59:59.000Z

    This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year 2011. It is the third report in a series examining financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined water years 1997 to 2005 (Veselka et al. 2011), and a report released in August 2011 examined water years 2006 to 2010 (Poch et al. 2011). An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes both that operations comply with the ROD operating criteria and the experimental releases that actually took place during the study period, and (2) a 'without experiments' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP powerplant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases conducted in water year 2011 resulted only in financial costs; the total cost of all experimental releases was about $622,000.

  4. Multi-ratio transmission

    SciTech Connect (OSTI)

    Polak, J.C.

    1987-07-14T23:59:59.000Z

    A preselected multi-ratio power transmission is described comprising: input means for transmitting drive forces; output means; first, second and third friction clutch means each selectively engageable with the input means for accepting drive forces. First input gear means drivingly connects with the first friction clutch means; second input gear means drivingly connects with the second friction clutch means; third input gear means drivingly connects with the third clutch means; first output gear means drivingly connects with the first input gear means; second output gear means drivingly connects with the first and second input gear means; third output means drivingly connects between the third input gear means and the output means; and one double-acting synchronizer clutch for selectively engaging the first output gear means with the output means and alternately the second output gear means with the output means. The first friction clutch means and the one double-acting synchronizer clutch cooperates during engagement to establish two forward drive ratios between the input and output means. The second friction clutch means and the one double-acting synchronizer clutch cooperates during engagement to establish two other forward drive ratios between the input and output means. The third friction clutch means is engageable to provide another forward drive ratio between the input means and the output means; and the one double-acting synchronizer clutch is relieved of transmitting drive forces during the engagement of the third friction clutch means and being manipulable for alternate connection with either the first output gear or the second output gear while the third friction clutch means is engaged.

  5. Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1991-09-01T23:59:59.000Z

    Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

  6. Annual Confidential Financial Disclosure Report (OGE 450)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-10-01T23:59:59.000Z

    This Notice addresses the Executive Branch confidential financial disclosure requirements. These requirements apply to career GS (GM) employees. (Replaces DOE N 326.7).

  7. American Recovery and Reinvestment Act, Financial Assistance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - ARRAAttachment3.rtf FOIA Frequently Requested Documents: DE-EE0002884 Recovery Act - Integrated Algal Biorefinery (IABR) Financial Assistance Funding Opportunity Announcement...

  8. Annual Confidential Financial Disclosure Report (SF 450)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-10-13T23:59:59.000Z

    This Notice addresses the Executive Branch confidential financial disclosure requirements. These requirements apply to persons employed at the GS-15 level and below, except for Schedule C appointees.

  9. Heating National Ignition Facility, Realistic Financial Planning...

    Broader source: Energy.gov (indexed) [DOE]

    628 National Ignition Facility Realistic Financial Planning Rapid Modification are Essential Lessons Learned Report Apr 2010.pdf More Documents & Publications EIS-0236: Record of...

  10. THE DOE GUIDE TO FINANCIAL ASSISTANCE

    Office of Environmental Management (EM)

    as the Energy Policy Acts of 1992 and 2005 (EPAct), also provide authority for DOE to enter into financial assistance agreements. Generally, these statutes will identify the...

  11. Sandia National Laboratories: Public Health Service Financial...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    from Sandia National Laboratories (Sandia) Investigators' financial conflicts of interest. 1.2 This corporate policy applies to all Sandia employees and persons working on...

  12. Financial Opportunities | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2: FinalOffers New Training on Energy6 FederalofE: BibliographyEnergyFinancial

  13. Financial Opportunities | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Departmentof Ohio EnvironmentalEnergy Market TransformationFinancial

  14. Financial Opportunities | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Departmentof Ohio EnvironmentalEnergy MarketFinancial Opportunities

  15. Realistic Financial Planning and Rapid

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuringDepartment of EnergyU.N.Realistic Financial

  16. 2014 Second Quarter Financial Review

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTownDells, Wisconsin:Deployment ActivitiesAge Refining Air1, 2015 Financial4October

  17. Is Economics right for me? Economics is a social science which incorporates Mathematics and Statistics but also

    E-Print Network [OSTI]

    Harman, Neal.A.

    Economics Is Economics right for me? Economics is a social science which incorporates Mathematics-being, as well as political and financial decisions, then Economics is an excellent choice. You will need good in order to get the best out of this degree. Economics graduates are extremely employable and the skills

  18. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-07)

    SciTech Connect (OSTI)

    N /A

    2001-04-18T23:59:59.000Z

    Vegetation Management on section of three ROWs. The ROWs include selected sections of the McNary Powerhouse, the present and proposed new sections of the McNary-Roundup and the McNary Switchyard South Transmission lines. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for pertinent information on each section of referenced transmission line. BPA would conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon be a hazard to the transmission lines and to promote low-growing plant communities in the right-of-way and to clear vegetation from new rights-of-way corridors. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

  19. Electrical transmission line diametrical retainer

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

    2004-12-14T23:59:59.000Z

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  20. Midwest Transmission Workshop I Summary

    SciTech Connect (OSTI)

    Kevin Bryan

    2001-05-01T23:59:59.000Z

    OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

  1. AC and DC power transmission

    SciTech Connect (OSTI)

    Not Available

    1985-01-01T23:59:59.000Z

    The technical and economic assessment of AC and DC transmission systems; long distance transmission, cable transmission, system inter-connection, voltage support, reactive compensation, stabilisation of systems; parallel operation of DC links with AC systems; comparison between alternatives for particular schemes. Design and application equipment: design, testing and application of equipment for HVDC, series and shunt static compensated AC schemes, including associated controls. Installations: overall design of stations and conductor arrangements for HVDC, series and shunt static AC schemes including insulation co-ordination. System analysis and modelling.

  2. Transmission Expansion Planning One last thing or comment to mention is that, from my experience of taking EE 552 course, I

    E-Print Network [OSTI]

    McCalley, James D.

    , obtaining right-of-way, and finally building the circuit(s). It is not possible to account for this very1 Transmission Expansion Planning One last thing or comment to mention is that, from my experience of the transmission planning (optimization problem), however, the cost/benefit analysis part, which finally justifies

  3. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-10)

    SciTech Connect (OSTI)

    N /A

    2001-05-15T23:59:59.000Z

    BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD).

  4. Transmission Workshop | Department of Energy

    Energy Savers [EERE]

    - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A...

  5. Video transmission over wireless networks 

    E-Print Network [OSTI]

    Zhao, Shengjie

    2005-08-29T23:59:59.000Z

    Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

  6. Video transmission over wireless networks

    E-Print Network [OSTI]

    Zhao, Shengjie

    2005-08-29T23:59:59.000Z

    Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

  7. EIS-0231: Navajo Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

  8. Immunology of naturally transmissible tumours

    E-Print Network [OSTI]

    Siddle, Hannah V.; Kaufman, Jim

    2014-09-04T23:59:59.000Z

    in a graft. These APCs move to the draining lymph nodes of the host, after which primed effector T cells migrate back to the graft site and target foreign cells (reviewed in (10)). Alternatively, T cells can be primed with graft-derived peptides... transmissible venereal tumour at different stages of growth. Vet Immunol Immunopathol. 1998;64(2):133-47. 57. Chandler JP, Yang TJ. Canine transmissible venereal sarcoma: distribution of T and B lymphocytes in blood, draining lymph nodes and tumours...

  9. Transmission Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOriginEducationVideoStrategic|IndustrialCenter Gets PeopleTransmission Workshop Transmission

  10. Developing the Right Test Documentation

    E-Print Network [OSTI]

    and managing testing and test documentation. Over the past 17 years, we have criticized IEEE standard 829 (onDeveloping the Right Test Documentation Cem Kaner, J.D., Ph.D. Department of Computer Sciences Quality Conference #12;2Test Documentation Copyright © 2001 Cem Kaner and James Bach. All rights reserved

  11. Briefing Memo: Petroleum Product Transmission & Distribution...

    Energy Savers [EERE]

    Briefing Memo: Petroleum Product Transmission & Distribution Briefing Memo: Petroleum Product Transmission & Distribution Click below to download a PDF of the briefing memo....

  12. Agenda: Natural Gas: Transmission, Storage and Distribution ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Natural Gas: Transmission, Storage and Distribution Agenda: Natural Gas: Transmission, Storage and Distribution A Public Meeting on the Quadrennial Energy Review, Hosted by the...

  13. Financial Report 200708 Message from the President ...............................................4

    E-Print Network [OSTI]

    Indiana University

    #12;Financial Report 2007­08 #12;3 Message from the President ...............................................4 Message from the Vice President and Chief Financial Officer Message from the President #12;5 expanded existing financial aid and academic support programs and created

  14. Predicting financial distress using corporate efficiency and corporate governance measures 

    E-Print Network [OSTI]

    Zhiyong, Li

    2014-07-02T23:59:59.000Z

    Credit models are essential to control credit risk and accurately predicting bankruptcy and financial distress is even more necessary after the recent global financial crisis. Although accounting and financial information ...

  15. Compass Financial Stability and Savings Program

    E-Print Network [OSTI]

    Fraden, Seth

    Compass Financial Stability and Savings Program Pilot Evaluation: Second Year Report April 2013 Prepared for Compass Working Capital Boston, MA Prepared by Delia Kimbrel, Research Associate Institute, MA #12;Compass Working Capital Compass Working Capital ("Compass") provides incentive-based financial

  16. The Future of Financial Risk Management: Lessons

    E-Print Network [OSTI]

    Aronov, Boris

    The Future of Financial Risk Management: Lessons Charles S. Tapiero, Topfer Chair Distinguished Professor of Financial Engineering and Technology Management Department of Finance and Risk Engineering NYU, leading risk managers to turn to qualitative stress testingto turn to qualitative stresstesting, 4

  17. Detailed Financial Procedures Page 1 of 3

    E-Print Network [OSTI]

    Levi, Ran

    Detailed Financial Procedures Page 1 of 3 Inventories and Disposals Background In accordance with Standing Financial Regulation, Heads of Departments are responsible for maintaining inventories for all disposals thereof. (Ref 8.03 & 8.06) Inventory Spreadsheet The following information should be recorded

  18. FINANCIAL ECONOMICS RESOURCE ECONOMICS AND POLICY

    E-Print Network [OSTI]

    Thomas, Andrew

    ECONOMICS FINANCIAL ECONOMICS RESOURCE ECONOMICS AND POLICY Program of Study The School of Economics at the University of Maine provides excellent opportunities for graduate students to study applied economics, financial economics, and policy analysis. The School of Economics administers the Master

  19. 2011 Financial Report THE OHIO STATE UNIVERSITY

    E-Print Network [OSTI]

    of Accounting. Richelle L. Alamo Cost Analyst Michael A. Baker Financial Systems Analyst Suzanne M. Chizmar Chief Accountant Thomas F. Ewing Associate Controller Robert L. Hupp, II Financial Systems Analyst Jodi Report of Independent Auditors Management's Discussion and Analysis Consolidated Statements of Net Assets

  20. Tier II Canada Research Chair Financial Econometrics

    E-Print Network [OSTI]

    Sinnamon, Gordon J.

    Tier II Canada Research Chair in Financial Econometrics The University of Western Ontario Research Chair in the area of Financial Econometrics, at the rank of probationary (tenure-track) Assistant: Labour Economics, Macroeconomics, Micro Theory and Econometrics. Quantitative Finance is an area

  1. An introduction to financial econometrics Jianqing Fan

    E-Print Network [OSTI]

    Wang, Lily

    An introduction to financial econometrics Jianqing Fan Department of Operation Research econometrics? This simple question does not have a simple answer. The boundary of such an interdisciplinary speaking, financial econometrics is to study quantitative problems arising from finance. It uses sta

  2. The Manchester Metropolitan University Financial Statements

    E-Print Network [OSTI]

    The new Business School and Student Hub is an award-winning building constructed to the highest standards of energy efficiency and sustainable development. The building provides an inspirational learning and Financial Review The Governors submit the University's annual report and audited consolidated financial

  3. MANAGING JOB LOSS and FINANCIAL STRESS

    E-Print Network [OSTI]

    MANAGING JOB LOSS and FINANCIAL STRESS a Personal and Family Guide CENTER ON THE FAMILY #12;2 Managing Job Loss and Financial Stress The issues associated with losing one's job or having hours cut also have other assistance (e.g., job placement, resume preparation, retraining), of which you should

  4. Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08

    SciTech Connect (OSTI)

    N /A

    2001-04-23T23:59:59.000Z

    Clearing C-trees along the south side of the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All work is to be done on the south side of centerline. Target vegetation is the tall growing Firs along the edge of the ROW, all of which is located within the back yards of the property owners along the right-of-way. The density of vegetation is low and consists of C-Trees located within backyards, with the branches growing towards the lines. Due to lack of access and past verbal agreements with the landowners, permission/agreement has been difficult to obtain from the property owners. Permission has now been obtained to remove the C-Trees within their back yards which, will soon be a hazard to our transmission line facility. We are working with the landowners to get them to plant low growing scrubs and ornamentals within the right-of-way and adjacent to the right-of-way. A follow up herbicide treatment is not planned because the trees being cut will not re-sprout. This right-of-way or project area is on a three to four year maintenance schedule. Little or no treatment should be required in the immediate future.

  5. Consolidated financial statements for fiscal year 1996

    SciTech Connect (OSTI)

    NONE

    1997-02-01T23:59:59.000Z

    The following overview and accompanying audited financial statements have been prepared for Fiscal Year (FY) 1996 to report the financial position and the results of operations of the Department of Energy. These statements include the consolidated Statement of Financial Position and the consolidated Statement of Operations and Changes in Net Position. The statements have been prepared in accordance with the Office of Management and Budget Bulletin No. 94-01, Form and Content for Agency Financial Statements, and were developed in accordance with the hierarchy of accounting standards described therein. The overview provides a narrative on the Department of Energy`s mission, activities, and accomplishments. Utilizing performance measures as the primary vehicle for communicating Departmental accomplishments and results, this overview discusses the most significant measures while others are discussed in the supplemental information to the financial statements.

  6. Supporting Statement: OE Recovery Act Financial Assistance Grants...

    Energy Savers [EERE]

    Supporting Statement: OE Recovery Act Financial Assistance Grants OMB Control Number 1910-5149 Supporting Statement: OE Recovery Act Financial Assistance Grants OMB Control Number...

  7. Clean Energy Lending From the Financial Institution Perspective...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lending From the Financial Institution Perspective (Chapter 8 of the Clean Energy Finance Guide, 3rd Edition) Clean Energy Lending From the Financial Institution Perspective...

  8. administration financial fallout: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    > MyUCDavis portal available to PI to access financial information any time > Monitor budget and administer the financial Schladow, S. Geoffrey 164 Washington University...

  9. Financial and Activity Report - October 30, 2009 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    October 30, 2009 Financial and Activity Report - October 30, 2009 DOEFinancialandActivityReport10302009.xls More Documents & Publications Financial and Activity Report - July...

  10. THE UNIVERSITY OF BRITISH COLUMBIA CONSOLIDATED FINANCIAL STATEMENTS

    E-Print Network [OSTI]

    Handy, Todd C.

    ;Consolidated Financial Statements March 31, 2010 Table of Contents Year in Review .............................................. 36 #12;Consolidated Financial Statements March 31, 2010 Page | 1 Year in Review The University

  11. au marche financier: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2012 OFFICE OF INSPECTOR GENERAL. Martin Inspector General Acronyms AFR Agency Financial Report Caltech California Institute of Technology Financial Officer OIG Office of...

  12. Regulatory and Financial Reform of Federal Research Policy: Recommenda...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Financial Reform of Federal Research Policy: Recommendations to the NRC Committee on Research Universities Regulatory and Financial Reform of Federal Research Policy:...

  13. Approaches and Financial Models for Scaling up Norwegian Development...

    Open Energy Info (EERE)

    Financial Models for Scaling up Norwegian Development Assistance to Clean Energy Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Approaches and Financial Models for...

  14. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-04-01T23:59:59.000Z

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  15. Financial analysis of experimental releases conducted at Glen Canyon Dam during water years 2006 through 2010.

    SciTech Connect (OSTI)

    Poch, L. A.; Veselka, T. D.; Palmer, C. S.; Loftin, S.; Osiek, B. (Decision and Information Sciences); (Western Area Power Administration, Colorado River Storage Project Management Center)

    2011-08-22T23:59:59.000Z

    Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1996). New operating rules and management goals for GCD that had been specified in the Record of Decision (ROD) (Reclamation 1996) were adopted in February 1997. In addition to issuing new operating criteria, the ROD mandated experimental releases for the purpose of conducting scientific studies. A report released in January 2011 examined the financial implications of the experimental flows that were conducted at the GCD from 1997 to 2005. This report continues the analysis and examines the financial implications of the experimental flows conducted at the GCD from 2006 to 2010. An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes both that operations comply with the ROD operating criteria and the experimental releases that actually took place during the study period, and (2) a 'without experiments' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP powerplant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases in some water years resulted in financial benefits to Western while others resulted in financial costs. During the study period, the total financial costs of all experimental releases were more than $4.8 million.

  16. July 2, 2007 1 Optimal Transmission Switching

    E-Print Network [OSTI]

    Mangasarian, Olvi L.

    d to node n. zk: binary variable indicating whether transmission line k is removed from the system limit on number of open transmission lines Manuscript received July 2, 2007. This work was supported-mail: ferris@cs.wisc.edu). Sets : Set of all transmission lines L: Set of open transmission lines in solution

  17. The Politics of Human Rights in Argentina

    E-Print Network [OSTI]

    Brysk, Alison

    2013-01-01T23:59:59.000Z

    Valente,  Marcela.  “Argentina’s  Biggest  Human  Rights  Motor  is  Linked  to  Argentina’s  ‘Dirty  War’”.   New  fortune  of  my  heart.   Argentina's  1985  human  rights  

  18. Midwest Transmission Workshop III Summary

    SciTech Connect (OSTI)

    Kevin Bryan

    2003-03-12T23:59:59.000Z

    OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

  19. Reservations to human rights treaties 

    E-Print Network [OSTI]

    McCall-Smith, Kasey Lowe

    2012-06-26T23:59:59.000Z

    This thesis examines the default application of the 1969 Vienna Convention on the Law of Treaties reservation rules to reservations to human rights treaties. The contemporary practice of formulating reservations allows ...

  20. Riparian Rights: State Land (Indiana)

    Broader source: Energy.gov [DOE]

    The state reserves the power to sell, transfer, and convey, as provided by law, rights-of-way in public land for several purposes, including pipelines, gas pipelines, water pipelines, sewer lines,...

  1. Solar Easements and Rights Laws

    Broader source: Energy.gov [DOE]

    Washington's solar easement laws are similar to those in many other states. The law does not create an automatic right to sunlight. Rather, the law allows parties to enter into solar easement...

  2. Solar Easements and Rights Laws

    Broader source: Energy.gov [DOE]

    Maryland has a long-standing law protecting the rights of solar energy system owners. The original law prohibited restrictive land use covenants that imposed unreasonable limitations on the...

  3. Solar Easements and Rights Laws

    Broader source: Energy.gov [DOE]

    New Mexico's Solar Rights and Solar Recordation Acts (both contained in NMSA § 47-3) allow property owners to create solar easements for the purpose of protecting and maintaining proper access to...

  4. ITC Transmission | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas:ITC Transmission Jump to: navigation, search Name:

  5. Financial and Activity Report- December 7, 2012

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  6. Financial and Activity Report- December 9, 2011

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  7. Financial and Activity Report- December 14, 2012

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  8. Financial and Activity Report- December 31, 2011

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  9. Financial and Activity Report- December 2, 2011

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  10. Financial and Activity Report- December 21, 2012

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  11. Financial and Activity Report- December 16, 2011

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  12. Confidential Financial Disclosure Reports (OGE 450)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-12-09T23:59:59.000Z

    The directive establishes requirements and responsibilities for Departmental elements and employees regarding filing Confidential Financial Disclosure Reports (OGE Form 450) in accordance with the Ethics in Government Act of 1978, as amended.

  13. Negotiating with Labor under Financial Distress

    E-Print Network [OSTI]

    Benmelech, Efraim

    We analyze how firms renegotiate labor contracts to extract concessions from labor. While anecdotal evidence suggests that firms tend to renegotiate wages downward in times of financial distress, there is no empirical ...

  14. AGRICULTURE, 2003 Current Wisconsin Farm Financial Conditions

    E-Print Network [OSTI]

    Radeloff, Volker C.

    STATUS OF WISCONSIN AGRICULTURE, 2003 Current Wisconsin Farm Financial Conditions Situation and Challenges Department of Agricultural and Applied Economics College of Agricultural and Life Sciences OF WISCONSIN AGRICULTURE, 2003 An Annual Report by: Department of Agricultural and Applied Economics College

  15. AGRICULTURE, 2001 Current Wisconsin Farm Financial Conditions

    E-Print Network [OSTI]

    Radeloff, Volker C.

    STATUS OF WISCONSIN AGRICULTURE, 2001 Current Wisconsin Farm Financial Conditions Situation and Outlook for Farm Products and Inputs Special Articles · Outlook for the National Economy and Agricultural Policies · Smart Growth and Wisconsin Agriculture · The Wisconsin Agricultural Economy: A Broader

  16. Financial and Activity Report- September 28, 2012

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  17. Financial and Activity Report- October 28, 2011

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  18. Confidential Financial Disclosure Report (OGE Form 450)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-09-20T23:59:59.000Z

    This Notice addresses the Executive Branch confidential financial disclosure reporting requirements. These requirements apply to career GS/GM employees as well as employees serving in excepted service positions designated EJ, EK, and EN.

  19. Financial and Activity Report- October 12, 2012

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  20. Financial and Activity Report- October 19, 2012

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  1. Financial and Activity Report- October 26, 2012

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  2. Financial and Activity Report- October 5, 2012

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  3. Financial and Technical Resources The HUD Perspective 

    E-Print Network [OSTI]

    Jensen, J.

    2011-01-01T23:59:59.000Z

    Financial and Technical Resources The HUD Perspective U.S. Department of Housing and Urban Development Jerry Jensen, HUD Fort Worth Regional Office CATEE Conference November 9, 2011 Partnership for Sustainable Communities: Livability...

  4. Do financial investors destabilize the oil price?

    Gasoline and Diesel Fuel Update (EIA)

    Germany; e-mail: marco.lombardi@ecb.europa.eu 3 Department of Financial Economics, Ghent University, Woodrow Wilsonplein 5D, B-9000 Gent, Belgium; e-mail: ine.vanrobays@ugent.be...

  5. Draft Financial Operating Procedure Treasury Management

    E-Print Network [OSTI]

    Brierley, Andrew

    Management in the Public Services: Code of Practice (the Code), as described in Section 4 of that Code part of the annual review of the financial governance framework) to PARC on the adequacy

  6. Learning connections in financial time series

    E-Print Network [OSTI]

    Gartheeban, Ganeshapillai

    2014-01-01T23:59:59.000Z

    Much of modern financial theory is based upon the assumption that a portfolio containing a diversified set of equities can be used to control risk while achieving a good rate of return. The basic idea is to choose equities ...

  7. Financial Policy and Procedures for Reimbursable Work

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-08-15T23:59:59.000Z

    The directive establishes Department-wide financial policy and procedural guidance applicable to performing reimbursable work for other Federal agencies and with non-Federal Government entities, including foreign and commercial entities, State, and political subdivisions.

  8. Financial and Activity Report- Janurary 18, 2013

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  9. Financial and Activity Report- June 30, 2013

    Broader source: Energy.gov [DOE]

    The Monthly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  10. Financial and Activity Report- February 1, 2013

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  11. Financial and Activity Report- February 8, 2013

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  12. Financial and Activity Report- April 30, 2013

    Broader source: Energy.gov [DOE]

    The Monthly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  13. Financial and Activity Report- May 31, 2013

    Broader source: Energy.gov [DOE]

    The Monthly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  14. Financial and Activity Report- Janurary 11, 2013

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  15. Financial and Activity Report- Janurary 4, 2013

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  16. Financial and Activity Report- February 22, 2013

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  17. Financial and Activity Report- December 31, 2012

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  18. Financial and Activity Report- Janurary 25, 2013

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  19. Financial and Activity Report- February 15, 2013

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  20. Financial and Activity Report- March 1, 2013

    Broader source: Energy.gov [DOE]

    The Weekly Financial and Activity Reports section includes the Department of Energy's weekly report on spending and major actions related to the Recovery Act.  The "Weekly Update" tab includes...

  1. The Centre for Power Transmission

    E-Print Network [OSTI]

    Burton, Geoffrey R.

    The Centre for Power Transmission and Motion Control Centre for PTMC Department of Mechanical) 1225 38-6371 Email: ptmc@bath.ac.uk Web: http://www.bath.ac.uk/ptmc/ Consultancy Project WAVE POWER SYSTEM SIMULATIONS Power take-off systems Wave power take-off systems are an exciting new development

  2. The Centre for Power Transmission

    E-Print Network [OSTI]

    Burton, Geoffrey R.

    precision and high bandwidth motion control In fluid power systems, seals are typically passive elements Bois) PTO #12;5. Modelling and Development of Low Noise Hydraulic Fluid Power Systems Hydraulic fluidThe Centre for Power Transmission and Motion Control The Centre for PTMC: analytical

  3. Power superconducting power transmission cable

    DOE Patents [OSTI]

    Ashworth, Stephen P. (Cambridge, GB)

    2003-01-01T23:59:59.000Z

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  4. Essays on monetary economics and financial economics

    E-Print Network [OSTI]

    Kim, Sok Won

    2009-06-02T23:59:59.000Z

    ESSAYS ON MONETARY ECONOMICS AND FINANCIAL ECONOMICS A Dissertation by SOK WON KIM Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of DOCTOR... OF PHILOSOPHY August 2006 Major Subject: Economics ESSAYS ON MONETARY ECONOMICS AND FINANCIAL ECONOMICS A Dissertation by SOK WON KIM Submitted to the Office of Graduate Studies of Texas A&M University...

  5. Poverty, Armed Conflict and Financial Instability

    E-Print Network [OSTI]

    Baddeley, Michelle

    flows. Armed conflict does not always contribute to financial instability. Magnusson and Wydick (2001) discuss efficiency of markets in 8 largest African stock markets in comparison with emerging stock markets in South East Asia and Latin America... of strategies is is determined by the relative benefits and costs of reversion to conflict (Collier and Hoeffler, 2004, pp. 8-10). High levels of military spending are associated with increased risk of renewed conflict. 3 POVERTY, CONFLICT AND FINANCIAL...

  6. Financial analysis of experimental releases conducted at Glen Canyon Dam during water years 1997 through 2005.

    SciTech Connect (OSTI)

    Veselka, T. D.; Poch, L. A.; Palmer, C. S.; Loftin, S.; Osiek, B.; Decision and Information Sciences; Western Area Power Administration

    2010-04-21T23:59:59.000Z

    Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1996). New operating rules and management goals for GCD that had been specified in the Record of Decision (ROD) (Reclamation 1996) were adopted in February 1997. In addition to issuing new operating criteria, the ROD mandated experimental releases for the purpose of conducting scientific studies. This paper examines the financial implications of the experimental flows that were conducted at the GCD from 1997 to 2005. An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes operations comply with the ROD operating criteria and experimental releases that actually took place during the study period, and (2) a ''without experiments'' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases in some water years resulted in financial benefits to Western while others resulted in financial costs. During the study period, the total financial costs of all experimental releases were $11.9 million.

  7. IUPUI Financial Success Planning Action Tool IUPUI Office of Student Financial Services / 420 University Boulevard / Campus Center Suite 250

    E-Print Network [OSTI]

    Zhou, Yaoqi

    IUPUI Financial Success Planning Action Tool IUPUI Office of Student Financial Services / 420 EXPENSES = $ #12;IUPUI Financial Success Planning Action Tool IUPUI Office of Student Financial Services Scholarships (see OneStart) X = Private Scholarships X = Other (ex. GI Bill, Tuition Reimbursement) X = FAMILY

  8. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    analysis of the difference in transmission costs for wind andour meta-analysis on the unit cost of transmission for windanalysis of these studies reveals considerable differences in the implied unit cost of transmission for wind.

  9. Landowner’s Guide for Compatible Use of BPA Rights-of-Way

    SciTech Connect (OSTI)

    none,

    2011-02-01T23:59:59.000Z

    Keeping transmission lines safe and reliable is a critical priority for the Bonneville Power Administration. The key element in achieving those objectives is BPA’s ability to construct, operate and maintain its transmission lines and rights-of-way — the area under and around the lines. You can help BPA keep these rights-of-way clear of trees, brush and structures that could affect the safety or reliability of the transmission system. Prior to planting, digging, or constructing within BPA’s rights-of-way, fill out BPA’s Land Use Application Form. The information you provide on the application helps BPA understand your proposed use and the potential impacts to public safety, and the safety of our crews. BPA also reviews the application to determine whether a proposed use of land is compatible with the construction, operation and maintenance of BPA transmission lines. Coordinating with BPA early in your planning process can keep you safe and avoid wasting time and money.

  10. Productivity and Efficiency of US Gas Transmission Companies: A European Regulatory Perspective

    E-Print Network [OSTI]

    Jamasb, Tooraj; Pollitt, Michael G.; Triebs, T

    the Atlantic.4 Lastly, we would like to stress that all our conclusions apply to gas transmission only. Both in the US and in Europe different energy networks are regulated in different ways and with varying levels of success. This paper is organized... treats output as the “right-hand side” of our cost model and cost as input. We now discuss our variables one at a time. First, we turn to outputs or cost-drivers. Much of the literature on gas transmission uses production functions where the prime...

  11. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-09)

    SciTech Connect (OSTI)

    N /A

    2001-05-01T23:59:59.000Z

    BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's McNary-Santiam No. 1 Transmission Line, beginning in the summer of 2000 and ending in July, 2001. This Supplemental Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

  12. Idaho - IC 61-516 - Priority Designation for Electric Transmission Projects

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas:ITC Transmission Jump to:IcelandRight-of-Way| Open

  13. Potential impacts of nanotechnology on energy transmission applications and needs.

    SciTech Connect (OSTI)

    Elcock, D.; Environmental Science Division

    2007-11-30T23:59:59.000Z

    The application of nanotechnologies to energy transmission has the potential to significantly impact both the deployed transmission technologies and the need for additional development. This could be a factor in assessing environmental impacts of right-of-way (ROW) development and use. For example, some nanotechnology applications may produce materials (e.g., cables) that are much stronger per unit volume than existing materials, enabling reduced footprints for construction and maintenance of electricity transmission lines. Other applications, such as more efficient lighting, lighter-weight materials for vehicle construction, and smaller batteries having greater storage capacities may reduce the need for long-distance transport of energy, and possibly reduce the need for extensive future ROW development and many attendant environmental impacts. This report introduces the field of nanotechnology, describes some of the ways in which processes and products developed with or incorporating nanomaterials differ from traditional processes and products, and identifies some examples of how nanotechnology may be used to reduce potential ROW impacts. Potential environmental, safety, and health impacts are also discussed.

  14. NREL: Transmission Grid Integration - Transmission Planning and Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy: Grid IntegrationReportTransmission Planning and Analysis Thumbnail

  15. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    2007. “Inclusion of Wind in the MISO Transmission Expansionhttp://www.jcspstudy.org/ Midwest ISO (MISO). 2007. Midwest+Planning Midwest ISO (MISO). 2003. Midwest Transmission

  16. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01T23:59:59.000Z

    A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROMof establishing a wind transmission cost adder with respectthat involve wind and divide the cost by the relative share

  17. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01T23:59:59.000Z

    in calculating the unit cost of wind energy transmissionimpacts of the cost of transmission for wind energy. Only inj = Transmission cost per unit of wind energy weighted by

  18. Transmission

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssuesEnergy SolarRadioactiveITransactional7AMelissa Howell |

  19. Transmission

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del SolStrengthening a solidSynthesisAppliances » Data ManagementTransit

  20. Solar Rights | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssues DOE's Nuclear EnergySmart Metersof EnergyRights Solar Rights

  1. Midwest Transmission Workshop II Summary

    SciTech Connect (OSTI)

    Kevin Bryan

    2002-12-05T23:59:59.000Z

    OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

  2. NREL: Transmission Grid Integration - Webinars

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy: Grid IntegrationReportTransmission Planning and Analysis

  3. NREL: Transmission Grid Integration - Webmaster

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy: Grid IntegrationReportTransmission Planning and AnalysisWebmaster

  4. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

  5. Scanning Transmission Electron Microscopy for Nanostructure

    E-Print Network [OSTI]

    Pennycook, Steve

    152 6 Scanning Transmission Electron Microscopy for Nanostructure Characterization S. J. Pennycook. Introduction The scanning transmission electron microscope (STEM) is an invaluable tool atom. The STEM works on the same principle as the normal scanning electron microscope (SEM), by forming

  6. Sandia National Laboratories: energy transmission and distribution

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    grid relies on power transmission from the production source-be it a coal-fired plant, solar array, or wind farm-to the consumer. Long-distance transmission results in...

  7. Sandia National Laboratories: transmission grid integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    grid relies on power transmission from the production source-be it a coal-fired plant, solar array, or wind farm-to the consumer. Long-distance transmission results in...

  8. Florida Electric Transmission Line Siting Act (Florida)

    Broader source: Energy.gov [DOE]

    The Transmission Line Siting Act (TLSA) is the state’s centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15...

  9. Uncertain Power Flows and Transmission Planning

    E-Print Network [OSTI]

    capability and quantifying transmission revenues under uncertainty. Illustrative analyses demonstrated potential uses in transmission planning. Part I:Stochastic-Algebraic Evaluation of Available Transfer using a deterministic model for a given system state specified by given loads, generation, line

  10. Transmission Issues and Power Exchanges in Texas

    E-Print Network [OSTI]

    Hughes, H. L.

    on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult...

  11. Coiled transmission line pulse generators

    DOE Patents [OSTI]

    McDonald, Kenneth Fox (Columbia, MO)

    2010-11-09T23:59:59.000Z

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  12. Articles about Grid Integration and Transmission

    Broader source: Energy.gov [DOE]

    Stories about grid integration and transmission featured by the U.S. Department of Energy (DOE) Wind Program.

  13. California - Establishing Transmission Project Review Streamlining...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: California - Establishing Transmission Project Review Streamlining DirectivesPermitting...

  14. Discontinuities in transmission lines and wave guides

    E-Print Network [OSTI]

    Mathis, Harold Fletcher

    1952-01-01T23:59:59.000Z

    DISCONTINUITIES IN TRANSMISSION LINES AND WAVEGUIDES H. F. MATHIS DISCONTINUITIES IN TRANSMISSION LINES AND liVAVNGUIDBS A Thesis By Harola Fletcher htathis Approved as to style and content by: Chairman of Committee DISCONTINUITIES... Subject. Electrical Engineering COHERENT S PAGE I Introduct ion, II Dl. scontlnuit les in Transmission Lines 2 1. Some Seneral char aeter 1 st 1 ca of the transmission lines. . . , . . . , ~ 5 2 ~ 2. Types of dlscontlnuitles ln transmls- sl...

  15. Idaho - IDAPA 39.03.42 - Encroachment on State Highway Rights-of-Way | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas:ITC Transmission Jump to:IcelandRight-of-Way|Energy

  16. Idaho - Idaho Code 58-603 - Rights of Way Over State lands | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas:ITC Transmission JumpInformation 03 - Rights of

  17. Transmission Dr. Sandra Cruz-Pol

    E-Print Network [OSTI]

    Cruz-Pol, Sandra L.

    Transmission Lines Dr. Sandra Cruz-Pol ECE Dept. UPRM Exercise 11.3 n A 40-m long TL has Vg=15 Vrms to electric circuits! cmc kmc GHz Hz 15000,000,2000/ 000,560/ 2 60 == == Transmission Lines I. TL parameters-wave transformer ¨ Slotted line ¨ Single stub VI. Microstrips Transmission Lines (TL) n TL have two conductors

  18. Smart Grid Application of Optimal Transmission Switching

    E-Print Network [OSTI]

    Ferris, Michael C.

    ;6 Introduction continued Electric Transmission Network Flow Problem Optimal Power Flow (OPF) AlternatingSmart Grid Application of Optimal Transmission Switching By, Kory W. Hedman, et al.* University (Professor, UC Berkeley) #12;2 Motivation Co-optimize transmission topology and generation dispatch

  19. A Distributed System for Cooperative MIMO Transmissions

    E-Print Network [OSTI]

    Kalyanaraman, Shivkumar

    a distributed system for facilitating cooperative MIMO transmissions in networks without multiple antenna diversity can be leveraged at the network, link or physical layers to provide energy efficient transmissions for reliable low-power transmissions. The rest of this paper is organized as follows: the proposed system

  20. > MEPS06 Preprint Version Transmission Loss

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    .phulpin@supelec.fr Abstract - In the deregulated electrical power system, the allocation of transmission losses is becoming a key issue. The electric transmission power system is more and more constrained due to the increasing electrical power system, the allocation of transmission losses is becoming a key issue. The electric

  1. Integrated Transmission and Distribution Control

    SciTech Connect (OSTI)

    Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

    2013-01-16T23:59:59.000Z

    Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

  2. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15)

    SciTech Connect (OSTI)

    N /A

    2001-06-19T23:59:59.000Z

    BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. Work also includes clearing of a small (<1/4 mile) section of access road. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for detailed information on each section of the referenced transmission lines. BPA will conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon be a hazard to the transmission lines and where possible to promote low-growing plant communities in the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The vegetation needing control is mainly Douglas Fir, Alder, and blackberries as indicated in Section 1.2 of the attached checklist. The work involved in the ROW includes: clearing tall growing vegetation that is currently or will soon pose a hazard to the lines; treating the associated stumps and re-sprouts with herbicide to ensure that the roots are killed preventing new sprouts; and selectively eliminating tall growing vegetation before it reaches a height or density to begin competing with low-growing vegetation. All work will take place in existing rights-of-ways and around transmission structures. All work will be accomplished by selective vegetation control methods to assure that there is little potential harm to non-target vegetation and to low-growing plants. The work will provide system reliability and fire protection. Also, all off right-of-way trees that are potentially unstable and will fall within a minimum distance or into the zone where the conductors swing will be removed. Access roads will be treated using mowing and herbicide applications. The work will provide system reliability. The subject transmission lines range from 115kV to 230kV and are made up of accompanying access roads, steel and wooden transmission line structures and associated switching platforms. The minimum clearance ranges from 21 feet for 115kV lines to 23 feet for 230kV lines. ROW easement widths vary along the length of the project. Vegetation control for this project is designed to provide a 3 year maintenance free interval. In summary, the overall vegetation management scheme will be to selectively remove tall growing vegetation then apply selective herbicide treatment using cut stump applications.

  3. Rights, Obligations, and Future Generations

    E-Print Network [OSTI]

    Strole, Donald

    the right to use whatever we can regardless of the effects such action may have on future persons.2 On the other extreme are people who argue that future generations are entitled to a polution free environment, vast food reserves, and an abundance...

  4. Fact #850: December 8, 2014 Automatic Transmissions have closed...

    Broader source: Energy.gov (indexed) [DOE]

    Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed...

  5. Comments of New England Electric Transmission Corporation on...

    Broader source: Energy.gov (indexed) [DOE]

    out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

  6. Global warming, insurance losses and financial industry

    SciTech Connect (OSTI)

    Low, N.C. [UOB Life Assurance Limited, Singapore (Singapore)

    1996-12-31T23:59:59.000Z

    Global warming causes extremely bad weather in the near term. They have already caught the attention of the insurance industry, as they suffered massive losses in the last decade. Twenty-one out of the 25 largest catastrophes in the US, mainly in the form of hurricanes have occurred in the last decade. The insurance industry has reacted by taking the risk of global warming in decisions as to pricing and underwriting decisions. But they have yet to take a more active role in regulating the factors that contributes to global warming. How global warming can impact the financial industry and the modern economy is explored. Insurance and modern financial derivatives are key to the efficient functioning of the modern economy, without which the global economy can still function but will take a giant step backward. Any risk as global warming that causes economic surprises will hamper the efficient working of the financial market and the modern economy.

  7. 2002 The Society for the Study of Evolution. All rights reserved. Evolution, 56(6), 2002, pp. 10911100

    E-Print Network [OSTI]

    1091 2002 The Society for the Study of Evolution. All rights reserved. Evolution, 56(6), 2002, pp favor relatively monogamous mating strategies. We examine another way in which STDs can influence mating transmission probability is low, the disease dies out and is of no consequence. In contrast

  8. Interior Offers First Right-of-Way for Renewable Energy Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Action Plan to create American jobs, develop clean energy sources and cut carbon pollution, Secretary of the Interior Sally Jewell and Bureau of Ocean Energy Management (BOEM)...

  9. Interior Offers First Right-of-Way for Renewable Energy Transmission in

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment of EnergyIndustry15Among States inFederal Waters | Department

  10. Summary QER Panel - Cheyenne 2014 Rick Thompson - Senior Manager Transmission Land Rights and Permitting

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014,Zaleski -Blueprint | DepartmentExcellenceGuidance

  11. The US market for high-temperature superconducting wire in transmission cable applications

    SciTech Connect (OSTI)

    Forbes, D.

    1996-04-01T23:59:59.000Z

    Telephone interviews were conducted with 23 utility engineers concerning the future prospects for high-temperature superconducting (HTS) transmission cables. All have direct responsibility for transmission in their utility, most of them in a management capacity. The engineers represented their utilities as members of the Electric Power Research Institute`s Underground Transmission Task Force (which has since been disbanded). In that capacity, they followed the superconducting transmission cable program and are aware of the cryogenic implications. Nineteen of the 23 engineers stated the market for underground transmission would grow during the next decade. Twelve of those specified an annual growth rate; the average of these responses was 5.6%. Adjusting that figure downward to incorporate the remaining responses, this study assumes an average growth rate of 3.4%. Factors driving the growth rate include the difficulty in securing rights-of-way for overhead lines, new construction techniques that reduce the costs of underground transmission, deregulation, and the possibility that public utility commissions will allow utilities to include overhead costs in their rate base. Utilities have few plans to replace existing cable as preventive maintenance, even though much of the existing cable has exceeded its 40-year lifetime. Ten of the respondents said the availability of a superconducting cable with the same life-cycle costs as a conventional cable and twice the ampacity would induce them to consider retrofits. The respondents said a cable with those characteristics would capture 73% of their cable retrofits.

  12. Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-06-20T23:59:59.000Z

    BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

  13. CSE: Financial Engineering Track Robbin Tops, SAM

    E-Print Network [OSTI]

    Lang, Annika

    CSE: Financial Engineering Track Robbin Tops, SAM robbin.tops@sam.math.ethz.ch CSE: Financial Stochastic Processes: (Brownian Motion, L´evy processes) 0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 -2.5 -2 -1-)Differential Equations: (Heat Equation) 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 Stochastic

  14. The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.

    E-Print Network [OSTI]

    Wiser, Ryan

    2014-01-01T23:59:59.000Z

    on U. S . Wind Power Installation, Cost, and Performance30% wind penetration. Wind transmission costs in the severalof Transmission ($/kW-wind) Unit Cost of Transmission ($/

  15. Automated manual transmission mode selection controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI)

    1999-11-09T23:59:59.000Z

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  16. Automated manual transmission shift sequence controller

    DOE Patents [OSTI]

    Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

    2000-02-01T23:59:59.000Z

    A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

  17. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, Russell B. (Oakland, CA)

    1987-01-01T23:59:59.000Z

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  18. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, R.B.

    1985-08-15T23:59:59.000Z

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  19. Sandia Energy - Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol Home Distribution GridDocumentsInstituteThree-DimensionalTransmission Grid

  20. Scanning/Transmission Electron Microscopes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch > TheNuclearHomeland andEffectsScanning/Transmission Electron Microscopes

  1. Transmission Workshop | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2, 2015 - JanuaryTankToledo, Ohio,Transmission

  2. Siemens AG 2009. All rights reserved. Investitionsmanagement

    E-Print Network [OSTI]

    Manstein, Dietmar J.

    © Siemens AG 2009. All rights reserved. Investitionsmanagement Wie steuert man erfolgreich Investitionen? - Tools eines erfolgreichen, globalen Industrieunternehmens - Michael Sigmund CFO Siemens Investitionsplanung Berlin, 26. November, 2009 #12;Page 2 November 26, 2009 Copyright © Siemens AG 2009. All rights

  3. What's right SHIP & Healthcare Reform Forum

    E-Print Network [OSTI]

    Walker, Matthew P.

    &Health Reform What's right for you SHIP & Healthcare Reform Forum: What's Right for You This session will help you: * demystify the healthcare reform changes * explore your options * learn how

  4. Question of the Week: Do Energy-Related Financial Incentives...

    Broader source: Energy.gov (indexed) [DOE]

    Do Energy-Related Financial Incentives Prompt You to Be More Energy Efficient? Question of the Week: Do Energy-Related Financial Incentives Prompt You to Be More Energy Efficient?...

  5. Policy Flash 2009-01 Tips for Processing Financial Assistance...

    Office of Environmental Management (EM)

    09-01 Tips for Processing Financial Assistance Actions in STRIPES Policy Flash 2009-01 Tips for Processing Financial Assistance Actions in STRIPES Attached is Policy Flash 2009-01...

  6. Red Ink : open source financial analytics for people & communities

    E-Print Network [OSTI]

    O'Toole, Ryan (Ryan Michael)

    2010-01-01T23:59:59.000Z

    Red Ink is an open source social-financial web-service that enables people to share, aggregate, analyze, visualize and publish their financial transactions as individuals and ad-hoc groups, through data sharing campaigns. ...

  7. Development and application of a photovoltaic financial model

    E-Print Network [OSTI]

    Dietz, Brad

    2010-01-01T23:59:59.000Z

    Due to the relative immaturity of the solar farm industry, there are very few comprehensive financial models in use. I address this by developing a photovoltaic NPV financial model and apply the model to various base cases ...

  8. Fermilab | Director's Policy Manual | No. 15.000 Financial Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15.000 Rev. 0 Financial Management 2.0 Effective Date 1199 3.0 Scope This policy covers all financial activities carried out under the URA-DOE prime contract. 4.0 Applicability...

  9. Policy Flash 20 Acquisition Letter 2014-05/Financial Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    301 Contract Award letter FY2014 March 5.pdf Attachment 2A1 DOE Section 301 Financial Assistance Letter FY2014 March 5 2014.pdf Attachment 2A2 DOE Section 301 Financial Assistance...

  10. Determinants of Role Structure in Family Financial Management

    E-Print Network [OSTI]

    Rosen, Dennis L.; Granbois, Donald H.

    1983-01-01T23:59:59.000Z

    Variables determining the role of husband and wife in family financial management are explored based on in-home, personal interviews. Financial tasks reflecting implementation activities and two groupings of decision ...

  11. THREE ESSAYS ON MONITORING OF FINANCIAL REPORTING BY CORPORATE DIRECTORS

    E-Print Network [OSTI]

    Xu, Yang

    2012-08-31T23:59:59.000Z

    Recent high-profile financial scandals and increasing instances of restatements focus public attention on the role of audit committees, auditors and CFOs in maintaining the integrity and quality of corporate financial ...

  12. Policy Title: Travel HARVARD UNIVERSITY FINANCIAL POLICY Responsible Office: UFS

    E-Print Network [OSTI]

    Policy Title: Travel HARVARD UNIVERSITY FINANCIAL POLICY Responsible Office: UFS Effective Date: July 1, 2010 Revision Date: July 14, 2010TRAVEL Policy Number: TR104 HARVARD UNIVERSITY FINANCIAL POLICY POLICY STATEMENT Harvard University reimburses for necessary and reasonable travel expenses

  13. Essays on time series and causality analysis in financial markets 

    E-Print Network [OSTI]

    Zohrabyan, Tatevik

    2009-05-15T23:59:59.000Z

    Financial market and its various components are currently in turmoil. Many large corporations are devising new ways to overcome the current market instability. Consequently, any study fostering the understanding of financial ...

  14. History of wireless power transmission

    SciTech Connect (OSTI)

    Brown, W.C. [Microwave Power Transmission Systems, Weston, MA (United States)] [Microwave Power Transmission Systems, Weston, MA (United States)

    1996-12-31T23:59:59.000Z

    The history of wireless power transmission at microwave frequencies is reviewed with emphasis upon the time period starting with the post World War II efforts to use the new microwave technology developed during the war. A nationally televised demonstration of a microwave powered helicopter at the Spencer Laboratory of the Raytheon Co., in 1964 was the result of these early efforts and broadly introduced the concept of wireless power transmission to scientific and engineering communities and to the public. Subsequent development efforts centered on improving the efficiency of the interconversion of d.c. and microwave power at the ends of the system to reach a demonstrated overall d.c. to d.c. system efficiency of 54% in 1974. The response to the requirements of applications such as the Solar Power Satellite and high altitude microwave powered aircraft have changed the direction of technology development and greatly expanded the technology base. Recent and current efforts are centered on examining the use of higher frequencies than the baseline 2.45 GHz, and in reducing the system costs at 2.45 GHz. 26 refs., 14 figs.

  15. Representation of Limited Rights Data and Restricted Computer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Representation of Limited Rights Data and Restricted Computer Software Representation of Limited Rights Data and Restricted Computer Software Representation of Limited Rights Data...

  16. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-5) - Big Eddy-Ostrander Transmission Line

    SciTech Connect (OSTI)

    N /A

    2001-03-30T23:59:59.000Z

    BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's Big Eddy-Ostrander Transmission Line, beginning April and ending in May, 2001. A Checklist was completed for this project in accordance to the requirements identified in the Bonneville Power Administrations Transmission System Vegetation Management Program FEIS (DOE/EIS-0285). The Checklist evaluated the following areas: (1) Description of right-of-way and vegetation management needed; (2) Vegetation to be controlled; (3) Surrounding land use and landowner; (4) Natural Resource; (5) Vegetation control methods; (6) Debris disposal; (7) Monitoring; and (8) Appropriate environmental documentation. In preparation of this Supplement Analysis, the Checklist was reviewed. Specific information regarding the areas as identified above are described the attached checklist. This Supplement Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

  17. Financial Metrics Data Collection Protocol, Version 1.0

    SciTech Connect (OSTI)

    Fowler, Kimberly M.; Gorrissen, Willy J.; Wang, Na

    2010-04-30T23:59:59.000Z

    Brief description of data collection process and plan that will be used to collect financial metrics associated with sustainable design.

  18. Non-Linear Stochastic Fractional Programming Model of Financial ...

    E-Print Network [OSTI]

    2005-04-19T23:59:59.000Z

    of financial derivatives- II, Proceedings of International Conference on Business ... optimum allocation of recruitment in manpower planning, International Journal

  19. Financial health of the electric-utility industry

    SciTech Connect (OSTI)

    Not Available

    1982-10-01T23:59:59.000Z

    The following chapters are included: (1) financial health, (2) capital access, (3) causes of deterioration, and (4) implications. (MOW)

  20. West Virginia University 1 Financial Aid

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    Academic Progress · Consequences of Withdrawal Satisfactory Academic Progress Students who wish to receive funds administered by the Financial Aid Office must make measurable academic progress toward completionD): 2.5 GPA · Dentistry (DDS): 2.0 GPA · Medicine (MD): no GPA determined · Physical Therapy (DPT): 3

  1. Compass Financial Stability and Savings Program

    E-Print Network [OSTI]

    Fraden, Seth

    Compass Financial Stability and Savings Program Pilot Evaluation: Final Report 1 April 2014 Prepared for Compass Working Capital Boston, MA Prepared by Delia Kimbrel, Research Associate Sandra Venner Brandeis University, Waltham, MA #12;2 Compass Working Capital ("Compass") provides incentive

  2. Matched asymptotic expansions in financial engineering

    E-Print Network [OSTI]

    Howison, Sam

    Matched asymptotic expansions in financial engineering Sam Howison OCIAM and Nomura Centre of the approach in `plain vanilla' option valuation, in valuation using a fast mean-reverting-stochastic expansions applied directly to stochastic processes of diffusion type is also proposed. Keywords: option

  3. AGRICULTURE, 2002 Current Wisconsin Farm Financial Conditions

    E-Print Network [OSTI]

    Radeloff, Volker C.

    STATUS OF WISCONSIN AGRICULTURE, 2002 Current Wisconsin Farm Financial Conditions Situation of the Wisconsin Cranberry Industry Department of Agricultural and Applied Economics College of Agricultural-Extension #12;STATUS OF WISCONSIN AGRICULTURE, 2002 An Annual Report by: Department of Agricultural and Applied

  4. Banner Financial Aid Account Request Form

    E-Print Network [OSTI]

    Karsai, Istvan

    Banner Financial Aid Account Request Form ETSU Office of Information Technology 424 Roy Nicks Hall, Box 70728 Johnson City, Tennessee 37614 (423) 439-4648 · oithelp@etsu.edu This section for use ______________________________________________________________________________________ [last] [first] [middle] ETSU Domain Name ____________________@etsu.edu School / College

  5. STUDENT EMPLOYEE HANDBOOK Financial Aid Services

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    (413) 545-0801 (413) 545-1722 fax seo@finaid.umass.edu www.umass.edu/umfa/seo/ Updated 2013-2014 #12 Student Employment Office Financial Aid Services 243 Whitmore Building 413.545.0801 seo@finaid.umass.edu umass.edu/umfa/seo Paychecks Payroll Procedures Human Resources Employee Service Center 325 Whitmore

  6. Section 4 -Financial Information A. General Information

    E-Print Network [OSTI]

    Pantaleone, Jim

    Section 4 - Financial Information A. General Information 1. All University Housing and Dining fees of Alaska campuses until the debt is paid in full. B. Security deposit 1. A security deposit is required performance of the agreement, and (2) for damages beyond normal wear and tear. The security deposit does

  7. UNDERGRADUATE FINANCIAL AID 220 West College

    E-Print Network [OSTI]

    Singh, Jaswinder Pal

    UNDERGRADUATE FINANCIAL AID 220 West College REQUEST FOR SUMMER SAVINGS REPLACEMENT Do not mail _________ I was unable to meet my summer savings expectation for the reason(s) listed below and request __________________________________________ Date ____________ I worked but did not save the amount expected. Total Earnings $__________ Summer

  8. Financial Aid Information Professional Internship Program

    E-Print Network [OSTI]

    Financial Aid Information for Professional Internship Program (HRT 493 - 3 Credits) Students who for the full summer term. Students who wish to be considered full time while on internship should request this assistance from Susan Gruber before being enrolled for internship credits. This is entirely the student

  9. Financial and Technical Resources The HUD Perspective

    E-Print Network [OSTI]

    Jensen, J.

    2011-01-01T23:59:59.000Z

    Financial and Technical Resources The HUD Perspective U.S. Department of Housing and Urban Development Jerry Jensen, HUD Fort Worth Regional Office CATEE Conference November 9, 2011 Partnership for Sustainable Communities: Livability... Principles 1. Provide more transportation choices. 2. Promote equitable, affordable housing. 3. Enhance economic competitiveness. 4. Support existing communities. 5. Coordinate policies and leverage investment. 6. Value communities and neighborhoods...

  10. West Virginia University 1 Financial Aid

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    processed information, correct FAFSA data, and conduct other important business directly with the US To apply for financial aid, first apply for a US Department of Education student PIN and a parent PIN (if hours) as well as degree completion within 150% of the number of hours required for the degree

  11. West Virginia University 1 Financial Aid

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    processed information, correct FAFSA data, and conduct other important business directly with the US. Application Process To apply for financial aid, first apply for a US Department of Education student PIN of a % of all attempted hours) as well as degree completion within 150% of the number of hours required

  12. A little noticed right triangle

    E-Print Network [OSTI]

    Konstantine "Hermes" Zelator

    2008-04-08T23:59:59.000Z

    Given a right triangle ABC, with the ninety degree angle at A; consider the triangle O1OO2.Where the point O is the midpoint of the hypotenuseBC(and so the center of the triangle ABC's circumcircle), the point O1 being the triangle AOB's circumcenter, and the point O2 being the triangle AOC circumcenter. The triangle O1OO2 is actually a right triangle similar to ABC. In the early part of this work, some geometrical formulas are derived, including some lengths of segments from a nearby trapezoid. After that, the focus changes. We examine the case when ABC is a Pythagorean triangle, and find the precise conditions under which the triangle O1OO2 is also Pythagorean. A numerical table of values is also offered at the end of the paper.

  13. Mark Redekopp, All rights reserved Electrical Engineering

    E-Print Network [OSTI]

    Leahy, Richard M.

    © Mark Redekopp, All rights reserved Electrical Engineering at USC What it means to you... Mark Redekopp redekopp@usc.edu ENGR 101 #12;© Mark Redekopp, All rights reserved What is Electrical Engineering #12;© Mark Redekopp, All rights reserved What is Electrical Engineering · The key partner and enabling

  14. 2010Financial Letter of transmittaL

    E-Print Network [OSTI]

    Fernández-Juricic, Esteban

    and Finance, Treasurer approved for publication and transmission to the governor of the state. President during fiscal year 2010, including the new $52 million first street towers residence hall in august 2009

  15. Financial Report Letter of transmittaL

    E-Print Network [OSTI]

    Ginzel, Matthew

    and Finance, Treasurer approved for publication and transmission to the governor of the state. President street towers residence hall was completed in august 2009 and is now fully occupied. additional capital

  16. Faster Valuation of Financial Derivatives S. Paskov \\Lambda

    E-Print Network [OSTI]

    methods with Monte Carlo methods on the valuation of financial derivatives. We use a CollateralizedFaster Valuation of Financial Derivatives S. Paskov \\Lambda Department of Computer Science Columbia financial instruments. Vast sums are spent annually on these methods. Monte Carlo methods use random (or

  17. UndergraduateFinancialAid Information and Application Instructions

    E-Print Network [OSTI]

    . The Princeton Financial Aid Application on the Web To simplify the process of applying for financial aid, Princeton has developed its own aid application on the Web. The Princeton Financial Aid Application (PFAA to view it on the Web, but any new information must be sent by letter, fax or email. We will provide

  18. Bankers in the Ivory Tower: The Financialization of Governance at the University of California

    E-Print Network [OSTI]

    Eaton, Charlie; Goldstein, Adam; Habinek, Jacob; Kumar, Mukul; Stover, Tamera Lee; Roehrkasse, Alex

    2013-01-01T23:59:59.000Z

    Bankers in the Ivory Tower: The Financialization ofBankers in the Ivory Tower: The Financialization of

  19. The future of financial markets and regulation: What Strategy for Europe? The Future of Financial Markets and Regulation

    E-Print Network [OSTI]

    Boyer, Edmond

    The future of financial markets and regulation: What Strategy for Europe? 1 The Future of Financial Markets and Regulation: What Strategy for Europe? Jean-Baptiste Gossé1 Dominique Plihon2 Abstract This article provides insight into the future of financial markets and regulation in order to define what would

  20. Music Circulation and Transmission in Tbilisi, Georgia

    E-Print Network [OSTI]

    Sebald, Brigita

    2013-01-01T23:59:59.000Z

    and Work in Almaty, Kazakhstan. ” Critique of Anthropologyand Property Rights in Kazakhstan. ” Property in Question:Networks and Statehood in Kazakhstan. ” Nationalities Papers

  1. Magnetically insulated transmission line oscillator

    DOE Patents [OSTI]

    Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

    1988-01-01T23:59:59.000Z

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

  2. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, Kenneth E. (Naperville, IL)

    1989-01-01T23:59:59.000Z

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

  3. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, K.E.

    1988-07-28T23:59:59.000Z

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

  4. Final Report Navajo Transmission Project (NTP)

    SciTech Connect (OSTI)

    Bennie Hoisington; Steven Begay

    2006-09-14T23:59:59.000Z

    The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

  5. Transmission Expansion Planning Using an AC Model ...

    E-Print Network [OSTI]

    Periodicals

    2013-01-02T23:59:59.000Z

    Western Interconnection” under contract DOE-FOA0000068. ... problem to determine locations for placing new transmission ... KNITRO and BONMIN are de

  6. Exploring the Business Link Opportunity: Transmission & Clean...

    Energy Savers [EERE]

    Jennifer Weddle, Greenberg Traurig LLP Rapid Response Team for Transmission: Laura Smith Morton, DOE Energy Storage: Michael Stosser, Day Pitney LLP Centennial West Clean...

  7. In Situ Electrochemical Transmission Electron Microscopy for...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Battery Research. Abstract: The recent development of in situ liquid stages for (scanning) transmission electron microscopes now makes it possible for us to study the details...

  8. Sandia National Laboratories: Transmission Grid Integration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Grid Integration Wind Generator Modeling On June 26, 2014, in Computational Modeling & Simulation, Energy, Energy Surety, Grid Integration, Infrastructure Security,...

  9. Natural Gas Transmission Pipeline Siting Act (Florida)

    Broader source: Energy.gov [DOE]

    This Act establishes a centralized and coordinated permitting process for the location of natural gas transmission pipeline corridors and the construction and maintenance of natural gas...

  10. Natural Gas Transmission and Distribution Module This

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    They relate to (1) structural components of the model, (2) capacity expansion and pricing of transmission and distribution services, (3) Arctic pipelines, and (4) imports...

  11. Natural Gas Transmission and Distribution Module

    Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

    They relate to (1) structural components of the model, (2) capacity expansion and pricing of transmission and distribution services, (3) Arctic pipelines, and (4) imports...

  12. Proponent's Environmental Assessment (PEA) Checklist for Transmission...

    Open Energy Info (EERE)

    Proponent's Environmental Assessment (PEA) Checklist for Transmission Line and Substation Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  13. Transmission Reassignment Reporting Requirement - April 2, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CommitteesTeams Customer Training Interconnection Notices Rates Standards of Conduct Tariff TF Web Based Training Transmission Reassignment Reporting Requirement This notice...

  14. Transmission and Generation Investment in Electricity Markets

    E-Print Network [OSTI]

    Grimm Veronika

    2015-03-04T23:59:59.000Z

    Mar 4, 2015 ... The model incorporates investment decisions of the transmission operator and private firms in expectation of an energy-only market and ...

  15. 2006 National Electric Transmission Congestion Study Federal...

    Office of Environmental Management (EM)

    Comments to the Feb 06 FRN received after March 9, 2006 More Documents & Publications Proceedings of the March 29, 2006 Conference for the 2006 National Electric Transmission...

  16. Transmission Line Security Monitor: Final Report

    SciTech Connect (OSTI)

    John Svoboda

    2011-04-01T23:59:59.000Z

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  17. Coordinating Interstate Electric Transmission Siting: An Introduction...

    Open Energy Info (EERE)

    the near future. While improved demand-side management (including energy effi ciency and demand response), bett er utilization of the existing transmission grid, and other...

  18. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01T23:59:59.000Z

    New England Outlook: Smart Grid is About Consumers,” Apr. [Transmission in the Smart Grid By Kory Walter Hedman ATransmission in the Smart Grid by Kory Walter Hedman Doctor

  19. Detonator comprising a nonlinear transmission line

    DOE Patents [OSTI]

    Elizondo-Decanini, Juan M

    2014-12-30T23:59:59.000Z

    Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

  20. A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS

    E-Print Network [OSTI]

    Mills, Andrew; Wiser, Ryan; Porter, Kevin

    2007-01-01T23:59:59.000Z

    Report.pdf Midwest ISO (MISO). 2003. Midwest TransmissionConference September 2007 MISO. 2007. Midwest Transmission2006 SDG&E Midwest ISO (MISO) ISO/RTO February 2007 MISO '06

  1. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    on U.S. Wind Power Installation, Cost, and PerformanceTransmission ($/kW-wind) Unit Cost (Capacity-weighted) Windof Transmission ($/MWh- wind) Unit Cost (Capacity-weighted)

  2. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    E-Print Network [OSTI]

    Mills, Andrew D.

    2009-01-01T23:59:59.000Z

    2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

  3. Financial Recovery: Homeowner's Property Insurance Issues

    E-Print Network [OSTI]

    Granovsky, Nancy L.

    2008-09-23T23:59:59.000Z

    - owner?s property insurance. Does my property insurance cover water damage? Basic property policies do not insure against flood damage. Homeown- ers have to rely on flood coverage purchased separately through FEMA?s National Flood Insurance Program (NFIP... ER-035 9-23 Financial Recovery: Homeowner?s Property Insurance Issues Nancy L. Granovsky, Professor and Extension Family Economics Specialist, The Texas A&M University System People affected by hurricanes have many questions about their home...

  4. Computer models for evaluating financial decision alternatives

    E-Print Network [OSTI]

    Christian, James Carroll

    1973-01-01T23:59:59.000Z

    973 Major Subject: Industrial Engineering COMPUTER MODELS FOR EVALUATING FINANCIAL DECISION ALTERNATIVES A Thesis by JAMES CARROLL CHRISTIAN Approved as to style and content by: . '; . . i', , ( (Chairman of Committee) (Head of Depar n... of this research is to bridge this gap by de- veloping the methodology necessary to solve personal finance problems in a quantitative method through the application of engineering economy principles. ACKNOWLEDGEMENTS I would like to express my sincere...

  5. Active Financial Assistance Letters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergyDepartment ofATVM LoanActive Financial Assistance Letters Active

  6. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  7. Probabilistic Reliable Message Transmission Subodh Kumar

    E-Print Network [OSTI]

    North Carolina at Chapel Hill, University of

    Probabilistic Reliable Message Transmission Subodh Kumar January 17, 1996 Abstract Most communication systems require reliable transmission of a sequence of messages over a physical network which can with messages by the sender and they are acknowledged by the receiver. It is known that protocols that use

  8. Empirical Analysis of Transmission Power Control Algorithms

    E-Print Network [OSTI]

    Culler, David E.

    Empirical Analysis of Transmission Power Control Algorithms for Wireless Sensor Networks Jaein · Power saving techniques in WSN ­ Duty-cycling, TX-power control, clustering ­ We study effect of TX-power transmission. End-to-end delivery rate TX Power Control Best of Fixed TX Power El Batt [1] 36.5% 35.5% PCBL [6

  9. EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada

    Broader source: Energy.gov [DOE]

    This EIS, being prepared jointly by DOE’s Western Area Power Administration and the Department of the Interior’s Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. Additional information is available at http://www.blm.gov/wy/st/en/info/NEPA/documents/hdd/transwest.html.

  10. Method of calibrating clutches in transmissions

    SciTech Connect (OSTI)

    Bulgrien, G.H.

    1991-02-05T23:59:59.000Z

    This paper describes a microprocessor controlling a shuttle shift transmission programmed to effect a calibration of the final drive clutches in the transmission so that the microprocessor can efficiently effect engagement of each respective clutch by applying the proper hydraulic pressure to cause proper engagement thereof. This method of calibrating the final drive clutches in the transmission includes braking the output shaft of the transmission so that any engagement of the selected final drive clutch being calibrated will cause a load to be applied to the engine. The hydraulic pressure is then incrementally increased until the engine RPM's decrease because of the load being placed on the engine. The value of this engagement hydraulic pressure is stored in the microprocessor for use when effecting engagement of the selected clutch during operation of the transmission. Service indicators are programmed into the microprocessor should the selected clutch not be capable of being calibrated.

  11. Low cost Image Transmission System

    SciTech Connect (OSTI)

    Skogmo, D.

    1994-06-01T23:59:59.000Z

    Throughout the Department of Energy (DOE) complex, sites protect themselves with intrusion detection systems. Some of these systems have sensors in remote areas. These sensors frequently alarm -- not because they have detected a terrorist skulking around the area, but because they have detected a horse, or a dog, or a bush moving in the breeze. Even though the local security force is 99% sure there is no real threat, they must assess each of these nuisance or false alarms. Generally, the procedure consists of dispatching an inspector to drive to the area and make an assessment. This is expensive in terms of manpower and the assessment is not timely. Often, by the time the inspector arrives, the cause of the alarm has vanished. A television camera placed to view the area protected by the sensor could be used to help in this assessment, but this requires the installation of high-quality cable, optical fiber, or a microwave link. Further, to be of use at the present time, the site must have had the foresight to have installed these facilities in the past and have them ready for use now. What is needed is a device to place between the television camera and a modem connecting to a low-bandwidth channel such as radio or a telephone line. This paper discusses the development of such a device: an Image Transmission System, or ITS.

  12. Revised financial analysis of experimental releases conducted at Glen Canyon Dam during water years 1997 through 2005.

    SciTech Connect (OSTI)

    Veselka, T. D.; Poch, L. A.; Palmer, C. S.; Loftin, S.; Osiek, B.; Decision and Information Sciences; Western Area Power Administration, Colorado River Storage Project Management Center

    2011-01-11T23:59:59.000Z

    Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1996). New operating rules and management goals for GCD that had been specified in the Record of Decision (ROD) (Reclamation 1996) were adopted in February 1997. In addition to issuing new operating criteria, the ROD mandated experimental releases for the purpose of conducting scientific studies. This paper examines the financial implications of the experimental flows that were conducted at the GCD from 1997 to 2005. An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes operations comply with the ROD operating criteria and experimental releases that actually took place during the study period, and (2) a 'without experiments' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases in some water years resulted in financial benefits to Western whileothers resulted in financial costs. During the study period, the total financial costs of all experimental releases were more than $23 million.

  13. EA-1863: Vegetation Management on the Glen Canyon-Pinnacle Peak Transmission Lines Spanning the Coconino National Forest, Coconino County, Arizona

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of updating the vegetation management and right-of-way maintenance program for Western’s Glen Canyon to Pinnacle Peak 345-kV transmission lines, which cross the Coconino National Forest, Coconino County, Arizona.

  14. EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah

    Broader source: Energy.gov [DOE]

    This EIS is being prepared jointly by DOE’s Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western’s proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

  15. Conductive Channel for Energy Transmission

    SciTech Connect (OSTI)

    Apollonov, Victor V. [A.M. Prokhorov General Physics Institute, Vavilov Str. 38, Moscow, 119991 (Russian Federation)

    2011-11-10T23:59:59.000Z

    For many years the attempts to create conductive channels of big length were taken in order to study the upper atmosphere and to settle special tasks, related to energy transmission. There upon the program of creation of 'Impulsar' represents a great interest, as this program in a combination with high-voltage high repetition rate electrical source can be useful to solve the above mentioned problems (N. Tesla ideas for the days of high power lasers). The principle of conductive channel production can be shortly described as follows. The 'Impulsar' - laser jet engine vehicle - propulsion take place under the influence of powerful high repetition rate pulse-periodic laser radiation. In the experiments the CO{sub 2}-laser and solid state Nd:YAG laser systems had been used. Active impulse appears thanks to air breakdown (<30 km) or to the breakdown of ablated material on the board (>30 km), placed in the vicinity of the focusing mirror-acceptor of the breakdown waves. With each pulse of powerful laser the device rises up, leaving a bright and dense trace of products with high degree of ionization and metallization by conductive nano-particles due to ablation. Conductive dust plasma properties investigation in our experiments was produced by two very effective approaches: high power laser controlled ablation and by explosion of wire. Experimental and theoretical results of conductive canal modeling will be presented. The estimations show that with already experimentally demonstrated figures of specific thrust impulse the lower layers of the Ionosphere can be reached in several ten seconds that is enough to keep the high level of channel conductivity and stability with the help of high repetition rate high voltage generator. Some possible applications for new technology are highlighted.

  16. Which Solicitation Is Right for Me?

    Broader source: Energy.gov [DOE]

    Applicants seeking funding for renewable energy or transmission projects (including manufacturing projects) that employ Innovative technology and are located in the United States, may be eligible...

  17. NOTIFICATION OF RIGHTS UNDER THE FAMILY EDUCATIONAL RIGHTS AND PRIVACY ACT (FERPA)

    E-Print Network [OSTI]

    Bolding, M. Chad

    , this right does not permit the student to contest a grade on the grounds that a higher grade is deserved) The right to refuse to permit the designation of any or all of the following categories of personally

  18. Impact of Financial Structure on the Cost of Solar Energy

    SciTech Connect (OSTI)

    Mendelsohn, M.; Kreycik, C.; Bird, L.; Schwabe, P.; Cory, K.

    2012-03-01T23:59:59.000Z

    To stimulate investment in renewable energy generation projects, the federal government developed a series of support structures that reduce taxes for eligible investors--the investment tax credit, the production tax credit, and accelerated depreciation. The nature of these tax incentives often requires an outside investor and a complex financial arrangement to allocate risk and reward among the parties. These financial arrangements are generally categorized as 'advanced financial structures.' Among renewable energy technologies, advanced financial structures were first widely deployed by the wind industry and are now being explored by the solar industry to support significant scale-up in project development. This report describes four of the most prevalent financial structures used by the renewable sector and evaluates the impact of financial structure on energy costs for utility-scale solar projects that use photovoltaic and concentrating solar power technologies.

  19. President’s Message – The Right Change for the Right Reasons

    E-Print Network [OSTI]

    Swadron, Stuart P

    2009-01-01T23:59:59.000Z

    Change for the Right Reasons President’s Message INSIDE:President’s Message (continued) S Swadron Bailout Nation D

  20. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect (OSTI)

    Jake P Gentle

    2012-08-01T23:59:59.000Z

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

  1. Financial statistics of major US publicly owned electric utilities 1994

    SciTech Connect (OSTI)

    NONE

    1995-12-15T23:59:59.000Z

    This publication presents 5 years (1990--94) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. Generator and nongenerator summaries are presented. Composite tables present: Aggregates of income statement and balance sheet data, financial indicators, electric operation and maintenance expenses, electric utility plant, number of consumers, sales of electricity, and operating revenue, and electric energy account data.

  2. Panel 2, Modeling the Financial and System Benefits of Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Modeling the Financial and System Benefits of Energy Storage Applications in Distribution Systems Patrick Balducci, Senior Economist, Pacific NW National Laboratory Hydrogen Energy...

  3. Financial statistics of major US publicly owned electric utilities 1993

    SciTech Connect (OSTI)

    Not Available

    1995-02-01T23:59:59.000Z

    The 1993 edition of the Financial Statistics of Major U.S. Publicly Owned Electric Utilities publication presents five years (1989 to 1993) of summary financial data and current year detailed financial data on the major publicly owned electric utilities. The objective of the publication is to provide Federal and State governments, industry, and the general public with current and historical data that can be used for policymaking and decision making purposes related to publicly owned electric utility issues. Generator and nongenerator summaries are presented in this publication. The primary source of publicly owned financial data is the Form EIA-412, the Annual Report of Public Electric Utilities, filed on a fiscal basis.

  4. Financial Assurance for In Situ Uranium Facilities (Texas)

    Broader source: Energy.gov [DOE]

    Owners or operators are required to provide financial assurance for in situ uranium sites. This money is required for: decommissioning, decontamination, demolition, and waste disposal for buildings...

  5. Carrots for Utilities: Providing Financial Returns for Utility...

    Open Energy Info (EERE)

    Carrots for Utilities: Providing Financial Returns for Utility Investments in Energy Efficiency Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Carrots for Utilities:...

  6. Financial Vehicles within an Integrated Energy Efficiency Program...

    Energy Savers [EERE]

    1 Financial mechanisms within Integrated Energy Efficiency Programs Every successful energy efficiency program depends on four functional pillars - Demand Creation - Workforce...

  7. Optimisation of physical and financial power purchase portfolios

    E-Print Network [OSTI]

    Gorden Spangardt

    2002-10-18T23:59:59.000Z

    Oct 18, 2002 ... Optimisation of physical and financial power purchase portfolios. Gorden Spangardt (spa ***at*** umsicht.fhg.de) Michael Lucht (luc ***at*** ...

  8. CESC-Webinar: Financial and Policy Innovations to Support Energy...

    Open Energy Info (EERE)

    to Support Energy Efficiency: Energy Performance Contracting and On-Bill Financing Jump to: navigation, search Tool Summary LAUNCH TOOL Name: CESC-Webinar: Financial and Policy...

  9. AUAARHUS UNIVERSITY Travel claim -credit card Financial Control

    E-Print Network [OSTI]

    Financial Control 16-06-2014 Page 3 of 15 Country: Danmark A list of favourites is created as users use

  10. UNEP-GEF Renewable Energy Project Financial Risk Management in...

    Open Energy Info (EERE)

    Financial Risk Management 1 "This UNEPGEF targeted research project aims to catalyse new thinking in the risk management area, examining existing instruments and approaches and...

  11. TO: Procurement Directors FROM: Director, Contract and Financial...

    Office of Environmental Management (EM)

    revised Guide for Financial Assistance. The Guide has been updated to reflect changes to web sites, organization names, systems, and DOE policies and practices since the guide was...

  12. BetterBuildings Webinar Transcription - Financial Vehicles within...

    Energy Savers [EERE]

    Financial Institution Partners Transcript.doc Better Buildings Neighborhood Program Home Accomplishments History Better Buildings Partners Stories Interviews Videos Contact Us...

  13. Financial Institution Request for Proposals and Selection Process

    Broader source: Energy.gov [DOE]

    A state or local government typically conducts a competitive procurement procedure to award loan loss reserve (LLR) funds to a financial institution partner. The request for proposals (RFP)...

  14. Envisory Financial Risk Management | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual SiteofEvaluating A PotentialJump to:EmminolEntergyEnvisory Financial Risk Management Jump to:

  15. LPO Financial Performance Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment ofLetter Report:40PM toLED Lighting5-15Trade |VesselLPO Financial

  16. Selected Past Financial Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015ParentsMiddle|Security Enforcement Documentsis NotSelectFinancial

  17. STEP Financial Incentives Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy atLLC - FE DKT. 10-160-LNG - ORDERSTATE ENERGY PROGRAMJuly 2012STEM7Financial

  18. User Financial Accounts | Linac Coherent Light Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron SpinPrinceton PlasmaAfternoon4. UraniumUsedFacilities HighFinancial

  19. Financial Opportunities Delete Me | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport inEnergy June 6-7, 2013 MeetingEA # 1440 FINALbyFinancial Opportunities Delete

  20. FY 2006 Financial Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 FederalTexasManager6-OPAMGuiding DocumentsAppropriation (dollars6 Financial

  1. FY 2009 Financial Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 FederalTexasManager6-OPAMGuidingScience Nuclear08Statistical9 Financial

  2. Distributed Energy Financial Group | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOE FacilityDimondale, Michigan: EnergyTracer-Determined ResidenceFinancial Group

  3. MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES

    E-Print Network [OSTI]

    Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

    MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

  4. CHARACTERIZING LOSSES IN MICROSTRIP TRANSMISSION LINES Rashmi Pathak

    E-Print Network [OSTI]

    Timbie, Peter

    CHARACTERIZING LOSSES IN MICROSTRIP TRANSMISSION LINES by Rashmi Pathak A dissertation submitted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1 Transmission Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2 Engineering) at the UNIVERSITY OF WISCONSIN­MADISON Summer 2005 #12;i Characterizing Losses in Transmission

  5. Hydrogen Delivery Technologies and Pipeline Transmission of Hydrogen

    E-Print Network [OSTI]

    Hydrogen Delivery Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives, and Infrastructure Technologies Program #12;Pipeline Transmission of Hydrogen --- 2 Copyright: Design & Operation development) #12;Pipeline Transmission of Hydrogen --- 3 Copyright: Future H2 Infrastructure Wind Powered

  6. Flexible Transmission in the Smart Grid

    E-Print Network [OSTI]

    Hedman, Kory Walter

    2010-01-01T23:59:59.000Z

    restructured electricity markets in the USA, FTRs areUSA as a mechanism for allocating property rights to the electricitythe USA. When there is an emergency, the flow of electricity

  7. Gila to North Gila Transmission Line Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the new APS line. Western's land action entails acquiring up to an additional 50 feet right-of-way adjacent to the existing Gila Knob ROW, transferring a portion of the Gila...

  8. NOTICE OF RIGHTS-FOR ELECTRONIC NOTIFICATION

    E-Print Network [OSTI]

    Bogaerts, Steven

    the information in "Protect Your Family From Lead In Your Home" and the "Tenant Rights and Responsibilities Family From Lead in Your Home". If your tenant has a computer with email access, you may use this form of Springfield's "Tenant Rights and Responsibilities booklet," as well as a booklet entitled: "Protect Your

  9. Electric Power Generation and Transmission (Iowa)

    Broader source: Energy.gov [DOE]

    Electric power generating facilities with a combined capacity greater than 25 MW, as well as associated transmission lines, may not be constructed or begin operation prior to the issuance of a...

  10. Articles about Grid Integration and Transmission | Department...

    Broader source: Energy.gov (indexed) [DOE]

    grid integration and transmission featured by the U.S. Department of Energy (DOE) Wind Program. May 18, 2015 New Report Says Western Grid Can Weather Disturbances with High Wind,...

  11. Efficient Spectral Methods for Transmission Eigenvalues and ...

    E-Print Network [OSTI]

    2014-03-24T23:59:59.000Z

    Mar 20, 2014 ... The scattered electric and magnetic fields Es and Hs satisfy the Silver-M¨uller radiation ... of k for which the (homogeneous) interior transmission problem ...... Mathematical methods in the applied sciences, 27(18):2111–. 2129 ...

  12. Scanning Transmission Electron Microscopy Investigations of Complex...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scanning Transmission Electron Microscopy Investigations of Complex Oxides Monday, May 23, 2011 - 3:30pm SSRL Conference room 137-322 Professor Tom Vogt, NanoCenter & Department of...

  13. Data transmission element for downhole drilling components

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

    2006-01-31T23:59:59.000Z

    A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

  14. Electrical Transmission Line Diametrical Retention Mechanism

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

    2006-01-03T23:59:59.000Z

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

  15. Load-resistant coaxial transmission line

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe

    2006-01-03T23:59:59.000Z

    A transmission line for downhole tools that make up all or part of a tool string for drilling and production of oil, gas, and geothermal wells that can withstand the dynamic gravitational forces and other accelerations associated with downhole excavations. The transmission line has a metal tube, or outer conductor, that houses a coaxial wire inner conductor. A non-metallic dielectric material is interposed between the inner and outer conductors. The outer and inner conductors and the dielectric are sufficiently compressed together so that independent motion between them is abated. Compression of the components of the transmission line may be achieved by drawing the transmission through one or more dies in order to draw down the outer conductor onto the dielectric, or by expanding the inner conductor against the dielectric using a mandrel or hydraulic pressure. Non-metallic bead segments may be used in aid of the compression necessary to resist the dynamic forces and accelerations of drilling.

  16. Transmission policy in the United States

    E-Print Network [OSTI]

    Joskow, Paul L.

    2004-01-01T23:59:59.000Z

    This paper provides an overview of the development of electric power transmission access, pricing and investment policies in the U.S. over the last 15 years and evaluates the current state of those policies. Pre-liberalization ...

  17. Infrastructure Needs: Natural Gas/Electricity Transmission,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4,200 miles of transmission lines, 72,000 miles of distribution lines, and 6,300 miles of natural gas pipelines. Our over 8,600 employees are committed to our mission to deliver...

  18. Polarization transmission at RHIC, numerical simulations

    SciTech Connect (OSTI)

    Meot F.; Bai, M.; Liu, C.; Minty, M.; Ranjbar, V.

    2012-05-20T23:59:59.000Z

    Typical tracking simulations regarding the transmission of the polarization in the proton-proton collider RHIC are discussed. They participate in general studies aimed at understanding and improving polarization performances during polarized proton-proton runs.

  19. X-ray transmissive debris shield

    DOE Patents [OSTI]

    Spielman, Rick B. (Albuquerque, NM)

    1994-01-01T23:59:59.000Z

    A composite window structure is described for transmitting x-ray radiation and for shielding radiation generated debris. In particular, separate layers of different x-ray transmissive materials are laminated together to form a high strength, x-ray transmissive debris shield which is particularly suited for use in high energy fluences. In one embodiment, the composite window comprises alternating layers of beryllium and a thermoset polymer.

  20. MASe UCRL-15037 CONTINUOUSLY VARIABLE TRANSMISSIONS: THEORY AND...

    Office of Scientific and Technical Information (OSTI)

    transmission when operating in the power recirculation mode 20 Simple manual system to control the speed ratio of a variable V-belt continuously variable transmission 21 Schematic...

  1. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

  2. EIS-0325: Schultz-Hanford Area Transmission Line Project, WA

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  3. OAHU Wind Integration And Transmission Study: Summary Report...

    Energy Savers [EERE]

    OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory) OAHU Wind Integration And Transmission Study: Summary Report, NREL...

  4. QER Public Meeting in Newark, NJ: Electricity Transmission and...

    Energy Savers [EERE]

    Newark, NJ: Electricity Transmission and Distribution - East QER Public Meeting in Newark, NJ: Electricity Transmission and Distribution - East New Jersey Institute of Technology...

  5. DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of...

  6. Updating the Electric Grid: An Introduction to Non-Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the transmission system. Updating the Electric Grid: An Introduction to Non-Transmission Alternatives for Policymakers More Documents & Publications EAC Recommendations for DOE...

  7. In-situ Transmission Electron Microscopy and Spectroscopy Studies...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Electron Microscopy and Spectroscopy Studies of Interfaces in Li-ion Batteries: Challenges and In-situ Transmission Electron Microscopy and Spectroscopy Studies of...

  8. Regulatory Roadmap Workshop for Federal Bulk Transmission Regulations...

    Open Energy Info (EERE)

    for bulk transmission. Date: Tuesday, 29 July, 2014 - 09:30 - 15:30 Location: NREL Education Center Auditorium Golden, Colorado Groups: Federal Bulk Transmission Regulatory...

  9. Request for Information on Permitting of Transmission Lines:...

    Energy Savers [EERE]

    Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

  10. An environmental sample chamber for reliable scanning transmission...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    environmental sample chamber for reliable scanning transmission x-ray microscopy measurements under water vapor. An environmental sample chamber for reliable scanning transmission...

  11. CFN | Hitachi HD2700C Scanning Transmission Electron Microscope

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hitachi HD2700C Scanning Transmission Electron Microscope Contacts: Dong Su | Lihua Zhang | Huolin Xin The Hitachi 2700C is a dedicated Scanning Transmission Electron Microscope...

  12. EIS-0484: Montana-to-Washington Transmission System Upgrade Project...

    Energy Savers [EERE]

    4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington,...

  13. Integrating Renewable Energy into the Transmission and Distribution...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Integrating Renewable Energy into the Transmission and Distribution System of the U.S. Virgin Islands Integrating Renewable Energy into the Transmission and Distribution System of...

  14. EIS-0447: Champlain Hudson Power Express Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    47: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluated the...

  15. EA-1880: Big Bend to Witten Transmission Line Project, South...

    Office of Environmental Management (EM)

    880: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with...

  16. Eastern Wind Integration and Transmission Study -- Preliminary Findings: Preprint

    SciTech Connect (OSTI)

    Corbus, D.; Milligan, M.; Ela, E.; Schuerger, M.; Zavadil, B.

    2009-09-01T23:59:59.000Z

    This paper reviews the Eastern Wind Integration and Transmission Study, the development of wind datasets, the transmission analysis, and the results of wind integration analysis for four scenarios.

  17. 2006 National Electric Transmission Congestion Study and Related...

    Office of Environmental Management (EM)

    6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion...

  18. Factsheet: An Initiative to Help Modernize Natural Gas Transmission...

    Energy Savers [EERE]

    An Initiative to Help Modernize Natural Gas Transmission and Distribution Infrastructure Factsheet: An Initiative to Help Modernize Natural Gas Transmission and Distribution...

  19. QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission...

    Office of Environmental Management (EM)

    Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution Meeting Date and...

  20. 9-26 QER Report: Energy Transmission, Storage, and Distribution...

    Office of Environmental Management (EM)

    -26 QER Report: Energy Transmission, Storage, and Distribution Infrastructure | April 2015 QER Report: Energy Transmission, Storage, and Distribution Infrastructure | April 2015...