National Library of Energy BETA

Sample records for finally geo-political risks

  1. International environmental justice: Geo-political implications of the Basel agreement

    SciTech Connect (OSTI)

    Padgett, D.

    1995-12-01

    The 1994 Basel Convention concluded with a historical agreement to immediately ban the export of hazardous wastes for disposal from member countries of the Organization for Economic Co-operation and Development (OECD) to non-OECD nations. The OECD nations account for approximately 98 percent of the world`s toxic waste generation. As of December 31, 1997, exports of wastes for recycling will be illegal. For many years, industrialized nations have shipped hazardous wastes to developing nations under the guise of recycling. The ban will make 90 percent of current shipments unlawful. The United States was among the industrialized OCED nations declining to partake in the agreement. In March 1994, the Waste Export and Import Control Act was introduced to Congress by a concerned coalition of Representatives. The bill would ban all exports of toxic wastes except to those nations. Critics have argued that the nature of the Agreement makes it unenforceable under certain conditions. Applied geographical techniques are employed to reveal regions where the effectiveness of the waste ban may be challenged. Formulas are developed to determine the cost-benefit ratio for non-OECD nations involved in significant levels of toxic waste trade. Political and historical analyses are applied in order to clarify the U.S. opposition to the ban. A list of predictions is offered with the future of hazardous waste transhipments within the context of the world`s ever-changing geo-political sphere. Suggestions for improving the effectiveness and enforceability of the Basel Agreement are offered for discussion.

  2. Cavity degradation risk insurance assessment. Final report

    SciTech Connect (OSTI)

    Hampson, C.; Neill, P.; de Bivort, L.

    1980-01-01

    This study examined the risks and risk management issues involved with the implementation by electric power utilities of compressed air energy storage and underground pumped hydro storage systems. The results are listed in terms of relative risks for the construction and operation of these systems in different geologic deposits, with varying amounts of pressurization, with natural or man-made disasters in the vicinity of the storage equipment, and with different modes of operating the facilities. (LCL)

  3. Cybersecurity Risk Management Process (RMP) Guideline - Final (May 2012) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Cybersecurity Risk Management Process (RMP) Guideline - Final (May 2012) Cybersecurity Risk Management Process (RMP) Guideline - Final (May 2012) This electricity subsector cybersecurity Risk Management Process (RMP) guideline was developed by the Department of Energy, in collaboration with the National Institute of Standards and Technology (NIST) and the North American Electric Reliability Corporation (NERC). The RMP is written with the goal of enabling organizations-

  4. Risk assessment meta tool LDRD final report.

    SciTech Connect (OSTI)

    Bouchard, Ann Marie; Osbourn, Gordon Cecil

    2006-12-01

    The goal of this project was to develop a risk analysis meta tool--a tool that enables security analysts both to combine and analyze data from multiple other risk assessment tools on demand. Our approach was based on the innovative self-assembling software technology under development by the project team. This technology provides a mechanism for the user to specify his intentions at a very high level (e.g., equations or English-like text), and then the code self-assembles itself, taking care of the implementation details. The first version of the meta tool focused specifically in importing and analyzing data from Joint Conflict and Tactical Simulation (JCATS) force-on-force simulation. We discuss the problem, our approach, technical risk, and accomplishments on this project, and outline next steps to be addressed with follow-on funding.

  5. 2007 Wholesale Power Rate Case Final Proposal : Risk Analysis Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-07-01

    BPA's operating environment is filled with numerous uncertainties, and thus the rate-setting process must take into account a wide spectrum of risks. The objective of the Risk Analysis is to identify, model, and analyze the impacts that key risks have on BPA's net revenue (total revenues less total expenses). This is carried out in two distinct steps: a risk analysis step, in which the distributions, or profiles, of operating and non operating risks are defined, and a risk mitigation step, in which different rate tools are tested to assess their ability to recover BPA's costs in the face of this uncertainty. Two statistical models are used in the risk analysis step for this rate proposal, the Risk Analysis Model (RiskMod), and the Non-Operating Risk Model (NORM), while a third model, the ToolKit, is used to test the effectiveness of rate tools options in the risk mitigation step. RiskMod is discussed in Sections 2.1 through 2.4, the NORM is discussed in Section 2.5, and the ToolKit is discussed in Section 3. The models function together so that BPA can develop rates that cover all of its costs and provide a high probability of making its Treasury payments on time and in full during the rate period. By law, BPA's payments to Treasury are the lowest priority for revenue application, meaning that payments to Treasury are the first to be missed if financial reserves are insufficient to pay all bills on time. For this reason, BPA measures its potential for recovering costs in terms of probability of being able to make Treasury payments on time (also known as Treasury Payment Probability or TPP).

  6. Microsoft Word - 45237 FINAL_Rulison_Risk_Report eq

    Office of Legacy Management (LM)

    Sc Po Fu Pr Jeffr Jenn Febr Publ reenin otentia uture N roject R rey I. Daniel y B. Chapm ruary 2011 ication No. ng Ass al Hum Natur Ruliso ls man 45237 Prepar Divisio Desert Prepar S. M. S U.S. D sessme man-H al-Ga on in W red by on of Hydro t Research In red for Stoller Corp Department o ent of Health s Drill Weste logic Scienc nstitute, Nev oration, Offi of Energy, G Risk ling N ern Co ces, Las Veg vada System fice of Legac Grand Junctio L from Near olorad gas, NV of Higher E cy Managem on,

  7. Cooled silicon nitride stationary turbine vane risk reduction. Final report

    SciTech Connect (OSTI)

    Holowczak, John

    1999-12-31

    The purpose of this program was to reduce the technical risk factors for demonstration of air cooled silicon nitride turbine vanes. The effort involved vane prototype fabrication efforts at two U.S. based gas turbine grade silicon nitride component manufacturers. The efficacy of the cooling system was analyzed via a thermal time/temperature flow test technique previously at UTRC. By having multiple vendors work on parts fabrication, the chance of program success increased for producing these challenging components. The majority of the effort under this contract focused on developing methods for, and producing, the complex thin walled silicon nitride vanes. Components developed under this program will undergo engine environment testing within N00014-96-2-0014.

  8. Novel Threat-risk Index Using Probabilistic Risk Assessment and Human Reliability Analysis - Final Report

    SciTech Connect (OSTI)

    George A. Beitel

    2004-02-01

    In support of a national need to improve the current state-of-the-art in alerting decision makers to the risk of terrorist attack, a quantitative approach employing scientific and engineering concepts to develop a threat-risk index was undertaken at the Idaho National Engineering and Environmental Laboratory (INEEL). As a result of this effort, a set of models has been successfully integrated into a single comprehensive model known as Quantitative Threat-Risk Index Model (QTRIM), with the capability of computing a quantitative threat-risk index on a system level, as well as for the major components of the system. Such a threat-risk index could provide a quantitative variant or basis for either prioritizing security upgrades or updating the current qualitative national color-coded terrorist threat alert.

  9. Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Vierow, Karen; Aldemir, Tunc

    2009-09-10

    The project entitled, “Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors”, was conducted as a DOE NERI project collaboration between Texas A&M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

  10. Analyzing health risks due to trace substance emissions from utility fossil-fired plants. Final report

    SciTech Connect (OSTI)

    1997-12-01

    EPRI has undertaken a number of project addressing a range of issues on the potential health effects due to long-term inhalation exposure to trace substances emitted from utility stacks. This report describes particular studies conducted to assess the health risks due to emissions from groups of power plants operated by individual utility companies. Researchers conducted specialized risk assessments for each of the power plants involved by incorporating utility-specific data into a modeling framework developed as part of EPRI`s Comprehensive Risk Evaluation (CORE) project to tailor the analysis for the individual utility. The results indicated the value of using more up-to-date, precise data in conducting risk assessments, rather than default assumptions. The report also describes CRAFT, the Comprehensive Risk Assessment Framework for Toxics software package, developed to perform these utility-wide air toxics risk assessments.

  11. FINAL Letter v1, 1/12/15, CRESP Site-Wide Risk Review Project 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Letter v1, 1/12/15, CRESP Site-Wide Risk Review Project 1 Author: Pam Larsen The Honorable Monica Regalbuto Assistant Secretary for Environmental Management Subject: Discontinue funding for CRESP studies from Hanford cleanup dollars Dear Assistant Secretary Regalbuto: The Hanford Advisory Board (HAB) is writing with respect to the draft Hanford Site-Wide Risk Review Project's Interim Progress Report (August 31, 2015), prepared by the Consortium for Risk Evaluation with Stakeholder Participation

  12. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants - Final Technical Report

    SciTech Connect (OSTI)

    Ritterbusch, Stanley; Golay, Michael; Duran, Felicia; Galyean, William; Gupta, Abhinav; Dimitrijevic, Vesna; Malsch, Marty

    2003-01-29

    OAK B188 Summary of methods proposed for risk informing the design and regulation of future nuclear power plants. All elements of the historical design and regulation process are preserved, but the methods proposed for new plants use probabilistic risk assessment methods as the primary decision making tool.

  13. Committee to evaluate Sandia`s risk expertise: Final report. Volume 1: Presentations

    SciTech Connect (OSTI)

    Dudley, E.C.

    1998-05-01

    On July 1--2, 1997, Sandia National Laboratories hosted the External Committee to Evaluate Sandia`s Risk Expertise. Under the auspices of SIISRS (Sandia`s International Institute for Systematic Risk Studies), Sandia assembled a blue-ribbon panel of experts in the field of risk management to assess their risk programs labs-wide. Panelists were chosen not only for their own expertise, but also for their ability to add balance to the panel as a whole. Presentations were made to the committee on the risk activities at Sandia. In addition, a tour of Sandia`s research and development programs in support of the US Nuclear Regulatory Commission was arranged. The panel attended a poster session featuring eight presentations and demonstrations for selected projects. Overviews and viewgraphs from the presentations are included in Volume 1 of this report. Presentations are related to weapons, nuclear power plants, transportation systems, architectural surety, environmental programs, and information systems.

  14. 2007 Wholesale Power Rate Case Final Proposal : Risk Analysis Study Documentation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-07-01

    The RiskMod Model is comprised of a set of risk simulation models, collectively referred to as RiskSim; a set of computer programs that manages data referred to as Data Management Procedures; and RevSim, a model that calculates net revenues. RiskMod interacts with the AURORA Model, the RAM2007, and the ToolKit Model during the process of performing the Risk Analysis Study. AURORA is the computer model being used to perform the Market Price Forecast Study (see Market Price Forecast Study, WP-07-FS-BPA-03); the RAM2007 is the computer model being used to calculate rates (see Wholesale Power Rate Development Study, WP-07-FS-BPA-05); and the ToolKit is the computer model being used to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard (see Section 3 in the Risk Analysis Study, WP-07-FS-BPA-04). Variations in monthly loads, resources, natural gas prices, forward market electricity prices, transmission expenses, and aluminum smelter benefit payments are simulated in RiskSim. Monthly spot market electricity prices for the simulated loads, resources, and natural gas prices are estimated by the AURORA Model. Data Management Procedures facilitate the format and movement of data that flow to and/or from RiskSim, AURORA, and RevSim. RevSim estimates net revenues using risk data from RiskSim, spot market electricity prices from AURORA, loads and resources data from the Load Resource Study, WP-07-FS-BPA-01, various revenues from the Revenue Forecast component of the Wholesale Power Rate Development Study, WP-07-FSBPA-05, and rates and expenses from the RAM2007. Annual average surplus energy revenues, purchased power expenses, and section 4(h)(10)(C) credits calculated by RevSim are used in the Revenue Forecast and the RAM2007. Heavy Load Hour (HLH) and Light Load Hour (LLH) surplus and deficit energy values from RevSim are used in the Transmission Expense Risk Model. Net revenues estimated for each simulation by RevSim are input into the ToolKit Model to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard. The processes and interaction between each of the models and studies are depicted in Graph 1.

  15. Risk assessment for produced water discharges to Louisiana open bays. Final report

    SciTech Connect (OSTI)

    Meinhold, A.F.; DePhillips, M.P.; Holtzman, S.

    1996-03-22

    The US Department of Energy (USDOE) has a program of research in the environmental aspects of oil and gas extraction. This sampling project will characterize the environmental impacts associated with the discharge of naturally occurring radioactive materials (NORM), metals and organics in produced water. This report is part of a series of studies of the health and ecological risks from discharges of produced water to the Gulf of Mexico, supported by the USDOE. These assessments are being coordinated with the field study, using the collected data to perform human health and ecological risk assessments. These assessments will provide input to regulators in the development of guidelines and permits, and to industry in the development and use of appropriate discharge practices. The initial human health and ecological risk assessments consist of conservative screening analyses meant to identify potentially important contaminants, and to eliminate others from further consideration. More quantitative assessments were done for contaminants identified, in the screening analysis, as being of potential concern. Section 2 gives an overview of human health and ecological risk assessment to help put the analyses presented here in perspective. Section 3 provides the hazard assessment portion of the risk assessment, and identifies the important receptors and pathways of concern. Section 3 also outlines the approach taken to the risk assessments presented in the rest of the report. The remaining sections (4 through 9) present the human health and ecological risk assessments for discharges of produced water to open bays in Louisiana.

  16. Risk Evaluation for CO2 Geosequestration in the Knox Supergroup, Illinois Basin Final Report

    SciTech Connect (OSTI)

    Hnottavange-Telleen, Ken; Leetaru, Hannes

    2014-09-30

    This report describes a process and provides seed information for identifying and evaluating risks pertinent to a hypothetical carbon dioxide (CO2) capture and sequestration (CCS) project. In the envisioned project, the target sequestration reservoir rock is the Potosi Formation of the Knox Supergroup. The Potosi is identified as a potential target formation because (1) at least locally, it contains vuggy to cavernous layers that have very high porosity, and (2) it is present in areas where the deeper Mt. Simon Sandstone (a known potential reservoir unit) is absent or nonporous. The key report content is discussed in Section 3.3, which describes two lists of Features, Events, and Processes (FEPs) that should be considered during the design stage of such a project. These lists primarily highlight risk elements particular to the establishment of the Potosi as the target formation in general. The lists are consciously incomplete with respect to risk elements that would be relevant for essentially all CCS projects regardless of location or geology. In addition, other risk elements specific to a particular future project site would have to be identified. Sources for the FEPs and scenarios listed here include the iconic Quintessa FEPs list developed for the International Energy Agency Greenhouse Gas (IEAGHG) Programme; previous risk evaluation projects executed by Schlumberger Carbon Services; and new input solicited from experts currently working on aspects of CCS in the Knox geology. The projects used as sources of risk information are primarily those that have targeted carbonate reservoir rocks similar in age, stratigraphy, and mineralogy to the Knox-Potosi. Risks of using the Potosi Formation as the target sequestration reservoir for a CCS project include uncertainties about the levels of porosity and permeability of that rock unit; the lateral consistency and continuity of those properties; and the ability of the project team to identify suitable (i.e., persistently porous and permeable) injection depths within the overall formation. Less direct implications include the vertical position of the Potosi within the rock column and the absence of a laterally extensive shale caprock immediately overlying the Potosi. Based on modeling work done partly in association with this risk report, risks that should also be evaluated include the ability of available methods to predict and track the development of a CO2 plume as it migrates away from the injection point(s). The geologic and hydrodynamic uncertainties present risks that are compounded at the stage of acquiring necessary drilling and injection permits. It is anticipated that, in the future, a regional geologic study or CO2-emitter request may identify a small specific area as a prospective CCS project site. At that point, the FEPs lists provided in this report should be evaluated by experts for their relative levels of risk. A procedure for this evaluation is provided. The higher-risk FEPs should then be used to write project-specific scenarios that may themselves be evaluated for risk. Then, actions to reduce and to manage risk can be described and undertaken. The FEPs lists provided as Appendix 2 should not be considered complete, as potentially the most important risks are ones that have not yet been thought of. But these lists are intended to include the most important risk elements pertinent to a Potosi-target CCS project, and they provide a good starting point for diligent risk identification, evaluation, and management.

  17. Microsoft PowerPoint - SWPA Transformer Oil Spill Risk Final 061108.ppt

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SWPA / SPRA / USACE SWPA / SPRA / USACE Marshall Boyken 2 Project Timeline Project Timeline Team Formed Team Formed - - June 2006 June 2006 Mission Statement & Questionnaire Mission Statement & Questionnaire First Meeting Eufaula First Meeting Eufaula - - Sept 2006 Sept 2006 Second Meeting Table Rock Second Meeting Table Rock - - Dec 2006 Dec 2006 Final SPCC Rule Final SPCC Rule - - Dec 2006 Dec 2006 Question Weighting Question Weighting - - Jan 2007 Jan 2007 Matrix Development Matrix

  18. Evaluation of safety assessment methodologies in Rocky Flats Risk Assessment Guide (1985) and Building 707 Final Safety Analysis Report (1987)

    SciTech Connect (OSTI)

    Walsh, B.; Fisher, C.; Zigler, G.; Clark, R.A.

    1990-11-09

    FSARs. Rockwell International, as operating contractor at the Rocky Flats plant, conducted a safety analysis program during the 1980s. That effort resulted in Final Safety Analysis Reports (FSARs) for several buildings, one of them being the Building 707 Final Safety Analysis Report, June 87 (707FSAR) and a Plant Safety Analysis Report. Rocky Flats Risk Assessment Guide, March 1985 (RFRAG85) documents the methodologies that were used for those FSARs. Resources available for preparation of those Rocky Flats FSARs were very limited. After addressing the more pressing safety issues, some of which are described below, the present contractor (EG&G) intends to conduct a program of upgrading the FSARs. This report presents the results of a review of the methodologies described in RFRAG85 and 707FSAR and contains suggestions that might be incorporated into the methodology for the FSAR upgrade effort.

  19. Expert judgment in assessing radwaste risks: What Nevadans should know about Yucca Mountain; [Final report

    SciTech Connect (OSTI)

    Shrader-Frechette, K.

    1992-06-01

    For phenomena characterized by accurate and largely complete data, quantitative risk assessment (QRA) provides extraordinarily valuable and objective information. However, with phenomena for which the data, models, or probabilities are incomplete or uncertain, QRA may be less useful and more questionable, because its conclusions are typically empirically and theoretically underdetermined. In the face of empirical or theoretical underdetermination, scientists often are forced to make a number of methodological value judgments and inferences about how to estimate and evaluate the associated risks. The purpose of this project is to evaluate instances of methodological value judgments and invalid or imprecise inferences that have occurred in the QRA done for the proposed Yucca Mountain high-level radioactive waste facility. We shall show (1) that questionable methodological value judgments and inferences have occurred in some Yucca Mountain QRA`S; (2) that questionable judgments and inferences, similar to those in the Yucca Mountain studies, have occurred in previous QRA`s done for other radiation-related facilities and have likely caused earlier QRA`s to err in specific ways; and (3) that, because the value judgments and problems associated with some Yucca Mountain QRA`s include repetitions of similar difficulties in earlier studies, therefore the QRA conclusions of some Yucca Mountain analyses are, at best, uncertain.

  20. Final Report: Risk assessment for produced water discharges to Louisiana open bays

    SciTech Connect (OSTI)

    Meinhold, A.F.; DePhillips, M.P.; Holtzman, S.

    1996-03-01

    Potential human health and environmental impacts from discharges of produced water to the Gulf of Mexico are of concern to regulators at the State and Federal levels, the public, environmental interest groups and industry. Current and proposed regulations require a zero discharge limit for coastal facilities, based primarily on studies in low energy, poorly flushed environments. However, produced water discharges in coastal Louisiana include a number of open bay sites, where potential human health and environmental impacts are likely to be smaller than those demonstrated for low energy canal environments, but greater than the minimal impacts associated with offshore discharges. Additional data and assessments are needed to support risk managers at the State and Federal levels in the development of regulations that protect human health and the environment without unnecessary cost to the economic welfare of the region and the nation. This project supports the Natural Gas and Oil Initiative objectives to: (1) improve coordination on environmental research; (2) streamline State and Federal regulation; (3) enhance State, and Federal regulatory decision making capability; (4) enhance dialogue through industry/government/public partnerships; and (5) work with States and Native American Tribes.

  1. State and national energy environmental risk analysis systems for underground injection control. Final report, April 7, 1992--May 31, 1995

    SciTech Connect (OSTI)

    1995-05-01

    The purpose of this effort is to develop and demonstrate the concept of a national Energy and Environmental Risk Analysis System that could support DOE policy analysis and decision-making. That effort also includes the development and demonstration of a methodology for assessing the risks of groundwater contamination from underground injection operations. EERAS is designed to enhance DOE`s analytical capabilities by working with DOE`s existing resource analysis models for oil and gas. The full development of EERAS was not planned as part of this effort. The design and structure for the system were developed, along with interfaces that facilitate data input to DOE`s other analytical tools. The development of the database for EERAS was demonstrated with the input of data related to underground injection control, which also supported the risk assessment being performed. The utility of EERAS has been demonstrated by this effort and its continued development is recommended. Since the absolute risk of groundwater contamination due to underground injection is quite low, the risk assessment methodology focuses on the relative risk of groundwater contamination. The purpose of this methodology is to provide DOE with an enhanced understanding of the relative risks posed nationwide as input to DOE decision-making and resource allocation. Given data problems encountered, a broad assessment of all oil reservoirs in DOE`s resource database was not possible. The methodology was demonstrated using a sample of 39 reservoirs in 15 states. While data difficulties introduce substantial uncertainties, the results found are consistent with expectations and with prior analyses. Therefore the methodology for performing assessments appears to be sound. Recommendations on steps that can be taken to resolve uncertainties or obtain improved data are included in the report.

  2. Final Report for the ZERT Project: Basic Science of Retention Issues, Risk Assessment & Measurement, Monitoring and Verification for Geologic Sequestration

    SciTech Connect (OSTI)

    Spangler, Lee; Cunningham, Alfred; Lageson, David; Melick, Jesse; Gardner, Mike; Dobeck, Laura; Repasky, Kevin; Shaw, Joseph; Bajura, Richard; McGrail, B Peter; Oldenburg, Curtis M; Wagoner, Jeff; Pawar, Rajesh

    2011-03-31

    ZERT has made major contributions to five main areas of sequestration science: improvement of computational tools; measurement and monitoring techniques to verify storage and track migration of CO{sub 2}; development of a comprehensive performance and risk assessment framework; fundamental geophysical, geochemical and hydrological investigations of CO{sub 2} storage; and investigate innovative, bio-based mitigation strategies.

  3. Pathways and barriers to genetic testing and screening: Molecular genetics meets the high-risk family. Final report

    SciTech Connect (OSTI)

    Duster, T.

    1998-11-01

    The proliferation of genetic screening and testing is requiring increasing numbers of Americans to integrate genetic knowledge and interventions into their family life and personal experience. This study examines the social processes that occur as families at risk for two of the most common autosomal recessive diseases, sickle cell disease (SC) and cystic fibrosis (CF), encounter genetic testing. Each of these diseases is found primarily in a different ethnic/racial group (CF in Americans of North European descent and SC in Americans of West African descent). This has permitted them to have a certain additional lens on the role of culture in integrating genetic testing into family life and reproductive planning. A third type of genetic disorder, the thalassemias was added to the sample in order to extent the comparative frame and to include other ethnic and racial groups.

  4. Centralized Cryptographic Key Management and Critical Risk Assessment - CRADA Final Report For CRADA Number NFE-11-03562

    SciTech Connect (OSTI)

    Abercrombie, R. K.; Peters, Scott

    2014-05-28

    The Department of Energy Office of Electricity Delivery and Energy Reliability (DOE-OE) Cyber Security for Energy Delivery Systems (CSEDS) industry led program (DE-FOA-0000359) entitled "Innovation for Increasing Cyber Security for Energy Delivery Systems (12CSEDS)," awarded a contract to Sypris Electronics LLC to develop a Cryptographic Key Management System for the smart grid (Scalable Key Management Solutions for Critical Infrastructure Protection). Oak Ridge National Laboratory (ORNL) and Sypris Electronics, LLC as a result of that award entered into a CRADA (NFE-11-03562) between ORNL and Sypris Electronics, LLC. ORNL provided its Cyber Security Econometrics System (CSES) as a tool to be modified and used as a metric to address risks and vulnerabilities in the management of cryptographic keys within the Advanced Metering Infrastructure (AMI) domain of the electric sector. ORNL concentrated our analysis on the AMI domain of which the National Electric Sector Cyber security Organization Resource (NESCOR) Working Group 1 (WG1) has documented 29 failure scenarios. The computational infrastructure of this metric involves system stakeholders, security requirements, system components and security threats. To compute this metric, we estimated the stakes that each stakeholder associates with each security requirement, as well as stochastic matrices that represent the probability of a threat to cause a component failure and the probability of a component failure to cause a security requirement violation. We applied this model to estimate the security of the AMI, by leveraging the recently established National Institute of Standards and Technology Interagency Report (NISTIR) 7628 guidelines for smart grid security and the International Electrotechnical Commission (IEC) 63351, Part 9 to identify the life cycle for cryptographic key management, resulting in a vector that assigned to each stakeholder an estimate of their average loss in terms of dollars per day of system operation. To further address probabilities of threats, information security analysis can be performed using game theory implemented in dynamic Agent Based Game Theoretic (ABGT) simulations. Such simulations can be verified with the results from game theory analysis and further used to explore larger scale, real world scenarios involving multiple attackers, defenders, and information assets. The strategy for the game was developed by analyzing five electric sector representative failure scenarios contained in the AMI functional domain from NESCOR WG1. From these five selected scenarios, we characterized them into three specific threat categories affecting confidentiality, integrity and availability (CIA). The analysis using our ABGT simulation demonstrated how to model the AMI functional domain using a set of rationalized game theoretic rules decomposed from the failure scenarios in terms of how those scenarios might impact the AMI network with respect to CIA.

  5. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE October 7, 2014 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Consortium for Risk Evaluation and Stakeholder Participation Hanford Site-wide Risk Review Project Discussion

  6. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE January 7, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Risk-Based Retrieval, Treatment, and Closure ............................................................................................. 1 Waste Management Area C Performance Assessment

  7. Final Optics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Final Optics Schematic layout of NIF's final optics assembly (FOA). The suite of optics for one beamline is on the right. The final optics assemblies (FOAs) are the last element of the main laser system and the first of the target area systems. Each FOA contains four integrated optics modules (IOMs) that incorporate beam conditioning, frequency conversion, focusing, diagnostic sampling, and debris shielding capabilities into a single compact assembly. These optics are shown in the figure at

  8. Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Final Report Document Number 11123-23.Final Field Demonstration of Eco-Friendly Creation of Propped Hydraulic Fractures Contract Number: 11123-23.Final February 16, 2015 Nadji Benrabah (Author) Engineer CSI Technologies 1930 W.W. Thorne Dr. Houston, TX 77073 Phil Van Trump (Principal Investigator) Chief Technology Officer DaniMer Scientific, LLC 1301 Colquitt Highway Bainbridge, GA 39817 2 LEGAL NOTICE This report was prepared by DaniMer Scientific, LLC as an account of work sponsored by the

  9. Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Simulation Software A simple fracture treatment design model was programed using Excel VBA. The goal was to estimate the pumping schedule and final conductivity of a fracture...

  10. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 22, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE September 22, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Consortium for Risk Evaluation with Stakeholder Participation Hanford Site-Wide Risk Review Project Interim Progress Report (joint w/ Oregon Hanford Cleanup Board members)

  11. FINAL RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RELEASE AWARDEE: ____________________________________________________ The work under Award No. DE-__________________________, dated ______________, between the United States of America (represented by the Department of Energy, National Energy Technology Laboratory, and the undersigned awardee, having been completed and finally accepted , and in consideration of Final Payment thereunder, the United States of America, its officers, agents and employees are hereby released from all liabilities,

  12. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants (Cooperative Agreement DE-FC03-99SF21902, Am. M004) Final Technical Report

    SciTech Connect (OSTI)

    Stanley E. Ritterbusch, et. al.

    2003-01-29

    OAK-B135 Research under this project addresses the barriers to long term use of nuclear-generated electricity in the United States. It was agreed that a very basic and significant change to the current method of design and regulation was needed. That is, it was believed that the cost reduction goal could not be met by fixing the current system (i.e., an evolutionary approach) and a new, more advanced approach for this project would be needed. It is believed that a completely new design and regulatory process would have to be developed--a ''clean sheet of paper'' approach. This new approach would start with risk-based methods, would establish probabilistic design criteria, and would implement defense-in-depth only when necessary (1) to meet public policy issues (e.g., use of a containment building no matter how low the probability of a large release is) and (2) to address uncertainties in probabilistic methods and equipment performance. This new approach is significantly different from the Nuclear Regulatory Commission's (NRC) current risk-informed program for operating plants. For our new approach, risk-based methods are the primary means for assuring plant safety, whereas in the NRC's current approach, defense-in-depth remains the primary means of assuring safety. The primary accomplishments in the first year--Phase 1 were (1) the establishment of a new, highly risk-informed design and regulatory framework, (2) the establishment of the preliminary version of the new, highly risk-informed design process, (3) core damage frequency predictions showing that, based on new, lower pipe rupture probabilities, the design of the emergency core cooling system equipment can be simplified without reducing plant safety, and (4) the initial development of methods for including uncertainties in a new integrated structures-systems design model. Under the new regulatory framework, options for the use of ''design basis accidents'' were evaluated. It is expected that design basis accidents would be an inherent part of the Probabilistic Safety Assessment for the plant and their evaluation would be probabilistic. Other first year accomplishments include (1) the conversion of an NRC database for cross-referencing NRC criteria and industry codes and standards to Microsoft 2000 software, (2) an assessment of the NRC's hearing process which concluded that the normal cross-examination during public hearings is not actually required by the U.S. Administrative Procedures Act, (3) the identification and listing of reliability data sources, and (4) interfacing with other industry groups (e.g., NEI and IAEA) and NRC at workshops for risk-informing regulations. The major accomplishments during the second year consisted of (1) issuance of the final report for Subtask 1.1, ''Identify Current Applicable Regulatory Requirements [and Industry Standards],'' (2) issuance of the final report for Subtask 1.2,'' Identify Structures, Systems, and Components and Their Associate d Costs for a Typical Plant,'' (3) extension of the new, highly risk-informed design and regulatory framework to non-light-water-reactor technology, (4) completion of more detailed thermal-hydraulic and probabilistic analyses of advanced conceptual reactor system/component designs, (6) initial evaluation and recommendations for improvement of the NRC design review process, and (7) initial development of the software format, procedures and statistical routines needed to store, analyze and retrieve the available reliability data. Final reports for Subtasks 1.1 (regulatory and design criteria) and 1.2 (costs for structures, systems, and components) were prepared and issued. A final report for Subtask 1.3 (Regulatory Framework) was drafted with the aim to issue it in Phase 3 (Year 3). One technical report was produced for Subtask 1.4 (methods development) and two technical reports were produced for Subtask 1.6 (sample problem analysis). An interim report on the NRC design review process (Subtask 1.7) was prepared and issued. Finally, a report on Subtask 2.2 (database weaknesses) addressed the i

  13. Final Report

    SciTech Connect (OSTI)

    Biros, George

    2014-08-18

    This the final report for the project "Large-Scale Optimization for Bayesian Inference in Complex Systems," for the work in the group of the co-PI George Biros.

  14. Final Report

    SciTech Connect (OSTI)

    Gurney, Kevin R

    2015-01-12

    This document constitutes the final report under DOE grant DE-FG-08ER64649. The organization of this document is as follows: first, I will review the original scope of the proposed research. Second, I will present the current draft of a paper nearing submission to Nature Climate Change on the initial results of this funded effort. Finally, I will present the last phase of the research under this grant which has supported a Ph.D. student. To that end, I will present the graduate student’s proposed research, a portion of which is completed and reflected in the paper nearing submission. This final work phase will be completed in the next 12 months. This final workphase will likely result in 1-2 additional publications and we consider the results (as exemplified by the current paper) high quality. The continuing results will acknowledge the funding provided by DOE grant DE-FG-08ER64649.

  15. Final Report

    SciTech Connect (OSTI)

    DeTar, Carleton

    2012-12-10

    This document constitutes the Final Report for award DE-FC02-06ER41446 as required by the Office of Science. It summarizes accomplishments and provides copies of scientific publications with significant contribution from this award.

  16. FINAL REPORT

    Office of Scientific and Technical Information (OSTI)

    FINAL REPORT Analytical and Elemental Analysis of Air and Soil Samples Facility and Public Awareness Partnership (Training/Public Awareness) Congressionally Awarded Grant No. DE-FG02-05ER64045 Submitted to: U.S. Department of Energy Attn: William Henson Submitted by: Alabama A&M University Research Institute (AAMURI) [pic] October 1, 2007 This report reflects a joint training program at the Integrated Environmental Research and Services (IERS) of the Alabama A&M University Research

  17. Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cyber Security for Utility Operations NETL Project M63SNL34 Sponsored by the U.S. DOE Office of Energy Assurance Managed by NETL Final Report Period of Performance October, 2003 - April, 2005 Dennis Holstein and John Tengdin, OPUS Publishing Jay Wack and Roger Butler, TecSec, Inc. Timothy Draelos, Sandia National Laboratories 1 Paul Blomgren, SafeNet/Mykotronx April 18, 2005 1 Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States

  18. Final Report

    SciTech Connect (OSTI)

    R Paul Drake

    2004-01-12

    OAK-B135 This is the final report from the project Hydrodynamics by High-Energy-Density Plasma Flow and Hydrodynamics and Radiation Hydrodynamics with Astrophysical Applications. This project supported a group at the University of Michigan in the invention, design, performance, and analysis of experiments using high-energy-density research facilities. The experiments explored compressible nonlinear hydrodynamics, in particular at decelerating interfaces, and the radiation hydrodynamics of strong shock waves. It has application to supernovae, astrophysical jets, shock-cloud interactions, and radiative shock waves.

  19. FINAL AGENDA

    Office of Environmental Management (EM)

    FINAL AGENDA 1 U.S. DEPARTMENT OF ENERGY TRANSPORTATION EXTERNAL COORDINATION WORKING GROUP (TEC) APRIL 4-5, 2005 PHOENIX, ARIZONA MONDAY, APRIL 4, 2005 7:30 a.m. - 5:00 p.m. General Registration 7:30 a.m. - 8:00 a.m. Continental Breakfast 8:00 a.m. - 10:00 am. Tribal Topic Group - Lead: Jay Jones, DOE/RW 10:00 a.m. - 10:30 a.m. Break 10:30 a.m. - 11:00 a.m. Welcome and Meeting Overview Introduction, Meeting Overview - Judith Holm, Director, DOE/RW, Operations Development Division, Office of

  20. BP-12 Final Models Datasets

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MB, XLS) Tier 2 Module of RAM RAM Tier 2 Pricing Module (4.8 MB, XLS) Tool Kit Files (TPP) ToolKit v4.8.1 BP-12 Final Studies Release 4-Aug-11 (12.5 MB, XLS) Risk Mod Output...

  1. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 12, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE January 12, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Draft Advice on the 100-D/H Proposed Plan ................................................................................................ 1 Letter on Consortium for Risk Evaluation

  2. Final Report

    SciTech Connect (OSTI)

    Webb, Robert C.; Kamon, Teruki; Toback, David; Safonov, Alexei; Dutta, Bhaskar; Dimitri, Nanopoulos; Pope, Christopher; White, James

    2013-11-18

    Overview The High Energy Physics Group at Texas A&M University is submitting this final report for our grant number DE-FG02-95ER40917. This grant has supported our wide range of research activities for over a decade. The reports contained here summarize the latest work done by our research team. Task A (Collider Physics Program): CMS & CDF Profs. T. Kamon, A. Safonov, and D. Toback co-lead the Texas A&M (TAMU) collider program focusing on CDF and CMS experiments. Task D: Particle Physics Theory Our particle physics theory task is the combined effort of Profs. B. Dutta, D. Nanopoulos, and C. Pope. Task E (Underground Physics): LUX & NEXT Profs. R. Webb and J. White(deceased) lead the Xenon-based underground research program consisting of two main thrusts: the first, participation in the LUX two-phase xenon dark matter search experiment and the second, detector R&D primarily aimed at developing future detectors for underground physics (e.g. NEXT and LZ).

  3. River Corridor Baseline Risk Assessment (RCBRA) Human Health Risk Assessment (Volume 2)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sands Jim Hansen U.S. Department of Energy - Richland Operations Office October 12, 2011 River Corridor Baseline Risk Assessment (RCBRA) Human Health Risk Assessment (Volume 2) * RCBRA Human Health Risk Assessment is final - Response provided to HAB advice #246 * RCBRA Ecological Risk Assessment (Draft C) was transmitted to regulators September 27 * Columbia River Component - Draft Ecological Screening Level Risk Assessment ready for regulator review - Draft Human health risk assessment will be

  4. Blackout 2003: Blackout Final Implementation Report | Department of Energy

    Energy Savers [EERE]

    Blackout Final Implementation Report Blackout 2003: Blackout Final Implementation Report Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations PDF icon Blackout Final Implementation Report More Documents & Publications Blackout 2003: The August 14, 2003 Blackout One Year Later: Actions Taken in the United States and Canada To Reduce Blackout Risk D:\0myfiles\Blackout Progress\Blackout-Progress.vp U.S. - Canada Power System Outage Task Force:

  5. High Risk Plan

    Office of Environmental Management (EM)

    Risk Plan John Bashista Melissa Rider Jeff Davis Timeline to date * OMB memo on Improving Government Acquisition issued July 29, 2009 - Review existing contracts and acquisition practices to save 7% of baseline contract spending (3.5% in FY 2010 and 3.5% in FY 2011) - Reduce high risk contracts by 10% the share of dollars obligated in FY2010 - Final plan was due and submitted on November 2, 2009 - OMB reviewed and requested revision Dec 23, 2009 - Revision submitted April 21, 2010 M&Os are

  6. Final EIS Volume 3

    Office of Environmental Management (EM)

    Volume 3 Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center DOE/EIS-0226 January 2010 The West Valley Site Comment Response Document Final Environmental Impact Statement for AVAILABILITY OF THE FINAL EIS FOR DECOMMISSIONING AND/OR LONG- TERM STEWARDSHIP AT THE WEST VALLEY DEMONSTRATION PROJECT AND WESTERN NEW YORK NUCLEAR SERVICE CENTER For further information on this Final

  7. WY Final EA DRAFT

    Broader source: Energy.gov (indexed) [DOE]

    Final Environmental Assessment Wallooskee-Youngs Confluence Restoration Project Bonneville Power Administration DOE/EA-1974 July 2015 This document is the Final Environmental Assessment (EA) for the proposed Wallooskee-Youngs Confluence Restoration Project. This document has been prepared as an abbreviated Final EA because there have been no substantial changes to the proposed action, alternatives, or environmental analysis presented in the Draft EA. This abbreviated Final EA provides changes

  8. Microsoft Word - FINAL_RAP_Apr2007_summary.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2007 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE MEETING April 11, 2007 Richland, WA Topics in this Meeting Summary Welcome and Introductions ................................................................................................ 1 M-15 Supplemental Characterization ................................................................................. 1 Central Plateau Ecological Risk

  9. National Science Bowl Finals

    ScienceCinema (OSTI)

    None

    2010-09-01

    National Science Bowl finals and awards at the National Building Museum in Washington D.C. Monday 5/3/2010

  10. DOE Final Report

    SciTech Connect (OSTI)

    Hinzman, Larry D.; Long, James; Newby, Greg B.

    2014-01-08

    This final report contains a summary of work accomplished in the establishment of a Climate Data Center at the International Arctic Research Center, University of Alaska Fairbanks.

  11. Final Project Report

    SciTech Connect (OSTI)

    Wang, Qiang; Dandy, David S.

    2015-05-15

    This is the final technical report of the DOE project DE-FG02-07ER46448 awarded to Colorado State University.

  12. Final EIS Volume 2

    Office of Environmental Management (EM)

    Volume 2 Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center DOE/EIS-0226 January 2010 The West Valley Site (Appendices A through R) AVAILABILITY OF THE FINAL EIS FOR DECOMMISSIONING AND/OR LONG- TERM STEWARDSHIP AT THE WEST VALLEY DEMONSTRATION PROJECT AND WESTERN NEW YORK NUCLEAR SERVICE CENTER For further information on this Final EIS, or to request a copy of the EIS or

  13. CFC Charity Fair Finale

    Broader source: Energy.gov [DOE]

    Finish out the 2012 CFC with the Charity Fair Finale! Buy cookies, participate in a putt-putt golf game, eat some popcorn, and meet and talk with CFC charity representatives.

  14. Aurora final report

    SciTech Connect (OSTI)

    Robert, Dross; Amedeo, Conti

    2013-12-06

    Final Technical report detailing the work done by Nuvera and its partners to fulfill the goals of the program "Transport Studies Enabling Efficiency Optimization of Cost-Competitive Fuel Cell Stacks" (a.k.a. AURORA)

  15. FINAL Submitted to NREL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... systems, usage feedback devices, optional demand-side FINAL Submitted to NREL 10-21-11 City of Naperville Case Study 4 programs, and intelligent charging options for electric cars. ...

  16. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    Water Heating in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South","West" "Water ...

  17. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Water Heating in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ... Cold","Mixed- Humid","Mixed-Dry" "Water Heating",,"Cold",,"Hot-Dry","Hot-Humid","M...

  18. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Water Heating in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ... to 119,999","120,000 or More" "Water Heating" "Total Homes",113.6,23.7,27.5,21....

  19. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    Water Heating in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ... Units","5 or More Units","Mobile Homes" "Water Heating" "Total Homes",113.6,71.8,6.7,9,19...

  20. Caspary Thesis Final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DENSITY AND BETA LIMITS IN THE MADISON SYMMETRIC TORUS REVERSED-FIELD PINCH by KYLE JONATHAN CASPARY A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy (PHYSICS) at the UNIVERSITY OF WISCONSIN-MADISON 2014 Date of final oral examination: March 24th, 2014 The dissertation is under review by the following members of the Final Oral Committee: Brett Chapman, Senior Scientist, Physics John Sarff, Professor, Physics Paul Terry, Professor, Physics

  1. Blackout Final Implementation Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force Natural Resources Canada U.S. Department of Energy September 2006 Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force September 2006 Natural Resources Canada U.S. Department of Energy Acknowledgments This document was prepared by staff of Natural Resources Canada and the U.S. Department of Energy. The principal contributors

  2. Final - Gasbuggy S

    Office of Legacy Management (LM)

    Gasbuggy S i t e Environmental Management End State Vision - January 2005 U.S. DEPARTMENT OF ENERGY Gasbuggy Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final Final - Gasbuggy Site Environmental Management End State Vhion - fanuaty 2005 Executive Summary The Environmental Management End State Vision is to be used as the primary tool for communicating the individual site end state to the involved parties (e.g., U.S. Department of Energy [DOE], regulators, public stakeholders, Tribal Nations).

  3. Microsoft PowerPoint - SWPA Transformer Oil Spill Risk Final...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to develop a system wide response to the issue of secondary containment of oil for transformers in service at Corps powerhouses and dam switchyards within Southwestern's marketing...

  4. Final 2011 Supplement Analysis of the 2005 Final SWEIS | National...

    National Nuclear Security Administration (NNSA)

    Office of General Counsel National Environmental Policy Act (NEPA) NEPA Reading Room Final 2011 Supplement Analysis of the 2005 ... Final 2011 Supplement Analysis of the...

  5. Final Technical Report

    SciTech Connect (OSTI)

    Gilbert, Chris

    2014-11-13

    The project, �Capital Investment to Fund Equipment Purchases and Facility Modifications to Create a Sustainable Future for EnergyXchange� served to replace landfill gas energy with alternative energy resources, primarily solar and wood waste. This is the final project closeout report.

  6. Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Troxell, W; Batchelor, A

    2012-11-28

    Final report for the formation of faculty and education establishing Colorado State's Smart Grid Integration Center

  7. Final Technical Report

    SciTech Connect (OSTI)

    Maxwell, Mike, J., P.E.

    2012-08-30

    The STI product is the Final Technical Report from ReliOn, Inc. for contract award DE-EE0000487: Recovery Act PEM Fuel Cell Systems Providing Emergency Reserve and Backup Power. The program covered the turnkey deployment of 431 ReliOn fuel cell systems at 189 individual sites for AT&T and PG&E with ReliOn functioning as the primary equipment supplier and the project manager. The Final Technical Report provides an executive level summary, a comparison of the actual accomplishments vs. the goals and objectives of the project, as well as a summary of the project activity from the contract award date of August 1, 2009 through the contract expiration date of December 31, 2011. Two photos are included in the body of the report which show hydrogen storage and bulk hydrogen refueling technologies developed as a result of this program.

  8. CX-100 Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SAND2008-4648 Unlimited Release Printed July 2008 Blade System Design Studies Phase II: Final Project Report Derek S. Berry TPI Composites, Inc. 373 Market Street Warren, RI 02885 Abstract This report details the work completed under Phase II of the Sandia National Laboratories Blade System Design Study blade design and manufacturing project; an integrated 9 meter blade design, tooling design and manufacturing, assembly fixture design and fabrication, blade production, blade instrumentation and

  9. DOE Laminar Final Report

    Office of Scientific and Technical Information (OSTI)

    1. Award #: DE-FG02-05ER46250 Institution: Cornell University. 2. Dates: Date of report: August 1, 2013. 3. Title: Transport Phenomena and Interfacial Kinetics in Planar Microfluidic Membraneless Fuel Cells P.I.: Héctor D. Abruña, Chemistry and Chemical Biology, Cornell University co-P.I.: Abraham D. Stroock, Chemical and Biomolecular Engineering, Cornell University 4. Final Report Abstract: Our work is focused on membraneless laminar flow fuel cells, an unconventional fuel cell technology,

  10. Final Environmental Assessment

    National Nuclear Security Administration (NNSA)

    1995 :&,, ' - , i . -- Final Environmental Assessment for Device Assembly - Facility Operations f 3: >fi - , - , ' , 7 - . ' ' , , . I 8 ' , :-<:- L , a . ' ' ' -L. -1 , , ~ e m - . - I ! - , - # 8 , r I I , , , - , . .-- - ' - I S - . ! - , - , Y 2 L - . . 8 : L.-- , r Nevada ' f e s t ~ h e , Nye county, Nevada U. S. Department Of Energy - , 8 - - . 8 - I,, ' - 8 - - , , 8 ENVIRONMENTAL ASSESSMENT for DEVICE ASSEMBLY FACIUTY OPERATIONS MAY 1995 TABLE OF CONTENTS LISTOFFIGURES . . . .

  11. NIST Finalizes Initial Set of Smart Grid Cyber Security Guidelines |

    Office of Environmental Management (EM)

    Department of Energy Finalizes Initial Set of Smart Grid Cyber Security Guidelines NIST Finalizes Initial Set of Smart Grid Cyber Security Guidelines September 2, 2010 - 3:15pm Addthis WASHINGTON, D.C. - The National Institute of Standards and Technology (NIST) issued today its first Guidelines for Smart Grid Cyber Security, which includes high-level security requirements, a framework for assessing risks, an evaluation of privacy issues at personal residences, and additional information for

  12. EA-1634: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    4: Final Environmental Assessment EA-1634: Final Environmental Assessment Lawrence Berkeley National Laboratory Seismic Life -Safety, Modernization and Replacement of General Purpose Buildings, Phase 2B The U.S. Department of Energy (DOE) is proposing the Seismic Phase 2B Project (Proposed Action) at the DOE Lawrence Berkeley National Laboratory (LBNL). The purpose and need of the Proposed Action and its alternatives is to remedy or remove space at LBNL which poses life safety risks and to

  13. Ecological Risk Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ecological Risk Assessments Ecological Risk Assessments Ecological risk assessment is the appraisal of potential adverse effects of exposure to contaminants on plants and animals....

  14. Risk Management RM

    Office of Environmental Management (EM)

    performance, schedule, and cost risks. Once risks are identified, sound risk mitigation strategies and actions should be developed and documented. This approach is further...

  15. Microsoft Word - Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Assessment of the Performance of COBRA-TF for the Prediction of Subcooled Boiling Conditions in Rod Bundles Dr. J. Michael Doster NCSU September 30, 2013 CASL-8-2013-0201-000 Final Report L3.THM.CFD.P7.07 Dr. J. Michael Doster Nuclear Engineering Department North Carolina State University Assessment of the Performance of COBRA-TF for the Prediction of Subcooled Boiling Conditions in Rod Bundles September 30, 2013 CASL-U-2013-0201-000 INTRODUCTION An assessment has been performed of the

  16. Near-Final Agenda

    Office of Environmental Management (EM)

    09 26 2014 Near-Final Agenda Workshop on Estimating the Benefits and Costs of Distributed Energy Technologies September 30 - October 1, 2014 Washington, DC September 30 - Day One 8:00 a.m. Coffee and Registration 8:30 Welcome and Opening Remarks * Overview and purpose of the workshop o Comments by senior DOE Officials o Q&A (time permitting) * Around-the-room introductions 9:00 Framing the Issues * Three presentations on key issues * Facilitated discussion 10:15 BREAK 10:30 Estimating the

  17. Clean Fleet Final Report

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    2 P r o j e c t D e s i g n a n d I m p l e m e n t a t i o n FINAL REPORT December 1995 December 1995 This information was prepared by Battelle Memorial Institute, Columbus Operations, through sponsorship by various companies and associations, the South Coast Air Quality Management District (District), and the California Energy Commission (Commission). Battelle has endeavored to produce a high quality study consistent with its contract commitments. However, because of the research and/or

  18. Clean Fleet Final Report

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    3 V e h i c l e M a i n t e n a n c e a n d D u r a b i l i t y FINAL REPORT December 1995 December 1995 December 1995 This information was prepared by Battelle Memorial Institute, Columbus Operations, through sponsor- ship by various companies and associations, the South Coast Air Quality Management District (District), and the California Energy Commission (Commission). Battelle has endeavored to produce a high quality study consistent with its contract commitments. However, because of the

  19. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-12

    The purpose of this guide is to describe effective risk management processes. The continuous and iterative process includes updating project risk documents and the risk management plan and emphasizes implementation communication of the risks and actions taken.

  20. Microsoft PowerPoint -Risk_Portfolio_Manager(RPM)_overview_Under...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PowerPoint - RiskPortfolioManager(RPM)overviewUnderSecDOE2011V4 Final 3-22-2011.ppt Read-Only Compatibili Microsoft PowerPoint - RiskPortfolioManager(RPM)overviewUn...

  1. Agenda- Interagency Steering Committee on Performance and Risk Assessment Community of Practice Annual Technical Exchange Meeting

    Broader source: Energy.gov [DOE]

    Final Agenda for the December, 2014 Interagency Steering Committee on Performance and Risk Assessment Community of Practice Annual Technical Exchange Meeting held in Las Vegas, Nevada.

  2. Final Scientific EFNUDAT Workshop

    ScienceCinema (OSTI)

    None

    2011-10-06

    The Final Scientific EFNUDAT Workshop - organized by the CERN/EN-STI group on behalf of n_TOF Collaboration - will be held at CERN, Geneva (Switzerland) from 30 August to 2 September 2010 inclusive.EFNUDAT website: http://www.efnudat.euTopics of interest include: Data evaluationCross section measurementsExperimental techniquesUncertainties and covariancesFission propertiesCurrent and future facilities  International Advisory Committee: C. Barreau (CENBG, France)T. Belgya (IKI KFKI, Hungary)E. Gonzalez (CIEMAT, Spain)F. Gunsing (CEA, France)F.-J. Hambsch (IRMM, Belgium)A. Junghans (FZD, Germany)R. Nolte (PTB, Germany)S. Pomp (TSL UU, Sweden) Workshop Organizing Committee: Enrico Chiaveri (Chairman)Marco CalvianiSamuel AndriamonjeEric BerthoumieuxCarlos GuerreroRoberto LositoVasilis Vlachoudis Workshop Assistant: Géraldine Jean

  3. Final Progress Report

    SciTech Connect (OSTI)

    Josef Michl

    2011-10-31

    In this project we have established guidelines for the design on organic chromophores suitable for producing high triplet yields via singlet fission. We have proven their utility by identifying a chromophore of a structural class that had never been examined for singlet fission before, 1,3-diphenylisobenzofuran, and demonstrating in two independent ways that a thin layer of this material produces a triplet yield of 200% within experimental error. We have also designed a second chromophore of a very different type, again of a structural class that had not been examined for singlet fission before, and found that in a thin layer it produces a 70% triplet yield. Finally, we have enhanced the theoretical understanding of the quantum mechanical nature of the singlet fission process.

  4. Final Scientific EFNUDAT Workshop

    ScienceCinema (OSTI)

    None

    2011-10-06

    The Final Scientific EFNUDAT Workshop - organized by the CERN/EN-STI group on behalf of n_TOF Collaboration - will be held at CERN, Geneva (Switzerland) from 30 August to 2 September 2010 inclusive.EFNUDAT website: http://www.efnudat.euTopics of interest include: Data evaluationCross section measurementsExperimental techniquesUncertainties and covariancesFission propertiesCurrent and future facilities  International Advisory Committee: C. Barreau (CENBG, France)T. Belgya (IKI KFKI, Hungary)E. Gonzalez (CIEMAT, Spain)F. Gunsing (CEA, France)F.-J. Hambsch (IRMM, Belgium)A. Junghans (FZD, Germany)R. Nolte (PTB, Germany)S. Pomp (TSL UU, Sweden) Workshop Organizing Committee: Enrico Chiaveri (Chairman)Marco CalvianiSamuel AndriamonjeEric BerthoumieuxCarlos GuerreroRoberto LositoVasilis Vlachoudis Workshop Assistant: Géraldine Jean

  5. FINAL/ SCIENTIFIC TECHNICAL REPORT

    SciTech Connect (OSTI)

    McDonald, Henry; Singh, Suminderpal

    2006-08-28

    The overall objective of the Chattanooga fuel cell demonstrations project was to develop and demonstrate a prototype 5-kW grid-parallel, solid oxide fuel cell (SOFC) system that co-produces hydrogen, based on Ion America’s technology. The commercial viability of the 5kW SOFC system was tested by transporting, installing and commissioning the SOFC system at the Alternative Energy Laboratory at the University of Tennessee – Chattanooga. The system also demonstrated the efficiency and the reliability of the system running on natural gas. This project successfully contributed to the achievement of DOE technology validation milestones from the Technology Validation section of the Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan. Results of the project can be found in the final technical report.

  6. Final Technical Report

    SciTech Connect (OSTI)

    Michael Read; R. Lawrence Ives; Patrick Ferguson

    2010-05-17

    Calabazas Creek Research Inc. (CCR) completed Phase I the development of a 10 MW, 1.3 GHz, annular beam klystron (ABK) for driving advanced accelerators, such as the International Linear Collider (ILC). Through detailed simulations in Phase I, CCR produced a design that meets all of the requirements for ILC. The ABK uses an annular beam to minimize space charge depression and the impedance. This allows the relatively low voltage of 120 kV specified for the International Linear Collider (ILC). Like the sheet beam klystron, the ABK uses a thin beam located close to the drift tube walls; however, it operates with lower risk, single mode cavities. In addition, it is azimuthally symmetric, dramatically reducing design and fabrication costs. It provides the same operating characteristics as a multi-beam klystron, but is far simpler and will be easier and less expensive to fabricate.

  7. Nested Narratives Final Report.

    SciTech Connect (OSTI)

    Wilson, Andrew T.; Pattengale, Nicholas D.; Forsythe, James C.; Carvey, Bradley John

    2015-02-01

    In cybersecurity forensics and incident response, the story of what has happened is the most impor- tant artifact yet the one least supported by tools and techniques. Existing tools focus on gathering and manipulating low-level data to allow an analyst to investigate exactly what happened on a host system or a network. Higher-level analysis is usually left to whatever ad hoc tools and techniques an individual may have developed. We discuss visual representations of narrative in the context of cybersecurity incidents with an eye toward multi-scale illustration of actions and actors. We envision that this representation could smoothly encompass individual packets on a wire at the lowest level and nation-state-level actors at the highest. We present progress to date, discuss the impact of technical risk on this project and highlight opportunities for future work.

  8. Technical Report - FINAL

    SciTech Connect (OSTI)

    Barbara Luke, Director, UNLV Engineering Geophysics Laboratory

    2007-04-25

    Improve understanding of the earthquake hazard in the Las Vegas Valley and to assess the state of preparedness of the area's population and structures for the next big earthquake. 1. Enhance the seismic monitoring network in the Las Vegas Valley 2. Improve understanding of deep basin structure through active-source seismic refraction and reflection testing 3. Improve understanding of dynamic response of shallow sediments through seismic testing and correlations with lithology 4. Develop credible earthquake scenarios by laboratory and field studies, literature review and analyses 5. Refine ground motion expectations around the Las Vegas Valley through simulations 6. Assess current building standards in light of improved understanding of hazards 7. Perform risk assessment for structures and infrastructures, with emphasis on lifelines and critical structures 8. Encourage and facilitate broad and open technical interchange regarding earthquake safety in southern Nevada and efforts to inform citizens of earthquake hazards and mitigation opportunities

  9. NGDS Final Report

    SciTech Connect (OSTI)

    Blackman, Harold; Moore, Joseph

    2014-06-30

    The ultimate goal of the National Geothermal Data System (NGDS) is to support the discovery and generation of geothermal sources of energy. The NGDS was designed and has been implemented to provide online access to important geothermal-related data from a network of data providers in order to: • Increase the efficiency of exploration, development and usage of geothermal energy by providing a basis for financial risk analysis of potential sites • Assist state and federal agencies in making land and resource management assessments • Foster the discovery of new geothermal resources by supporting ongoing and future geothermal-related research • Increase public awareness of geothermal energy It is through the implementation of this distributed data system and its subsequent use that substantial increases to the general access and understanding of geothermal related data will result. NGDS provides a mechanism for the sharing of data thereby fostering the discovery of new resources and supporting ongoing geothermal research.

  10. Title XVII Final Rule | Department of Energy

    Energy Savers [EERE]

    Final Rule Title XVII Final Rule PDF icon Title XVII Final Rule More Documents & Publications Final Rule (December 4, 2009) Notice of Proposed Rulemaking (August 6, 2009) Final Rule (October 23, 2007)

  11. Final Technical Report

    SciTech Connect (OSTI)

    Alexander Pigarov

    2012-06-05

    This is the final report for the Research Grant DE-FG02-08ER54989 'Edge Plasma Simulations in NSTX and CTF: Synergy of Lithium Coating, Non-Diffusive Anomalous Transport and Drifts'. The UCSD group including: A.Yu. Pigarov (PI), S.I. Krasheninnikov and R.D. Smirnov, was working on modeling of the impact of lithium coatings on edge plasma parameters in NSTX with the multi-species multi-fluid code UEDGE. The work was conducted in the following main areas: (i) improvements of UEDGE model for plasma-lithium interactions, (ii) understanding the physics of low-recycling divertor regime in NSTX caused by lithium pumping, (iii) study of synergistic effects with lithium coatings and non-diffusive ballooning-like cross-field transport, (iv) simulation of experimental multi-diagnostic data on edge plasma with lithium pumping in NSTX via self-consistent modeling of D-Li-C plasma with UEDGE, and (v) working-gas balance analysis. The accomplishments in these areas are given in the corresponding subsections in Section 2. Publications and presentations made under the Grant are listed in Section 3.

  12. Final Technical Report

    SciTech Connect (OSTI)

    Alexander Fridman

    2005-06-01

    This DOE project DE-FC36-04GO14052 ''Plasma Pilot Plant Test for Treating VOC Emissions from Wood Products Plants'' was conducted by Drexel University in cooperation with Georgia-Pacific (G-P) and Kurchatov Institute (KI). The objective of this project was to test the Plasma Pilot Plant capabilities in wood industry. The final goal of the project was to replace the current state-of-the-art, regenerative thermal oxidation (RTO) technology by Low-Temperature Plasma Technology (LTPT) in paper and wood industry for Volatile Organic Components (VOC) destruction in High Volume Low Concentration (HVLC) vent emissions. MetPro Corporation joined the team as an industrial partner from the environmental control business and a potential leader for commercialization. Concurrent Technology Corporation (CTC) has a separate contract with DOE for this technology evaluation. They prepared questionnaires for comparison of this technology and RTO, and made this comparison. These data are presented in this report along with the description of the technology itself. Experiments with the pilot plant were performed with average plasma power up to 3.6 kW. Different design of the laboratory and pilot plant pulsed coronas, as well as different analytical methods revealed many new peculiarities of the VOC abatement process. The work reported herein describes the experimental results for the VOCs removal efficiency with respect to energy consumption, residence time, water effect and initial concentration.

  13. Final Technical Report

    SciTech Connect (OSTI)

    Velasco, Mayda

    2013-11-01

    This work is focused on the design and construction of novel beam diagnostic and instrumentation for charged particle accelerators required for the next generation of linear colliders. Our main interest is in non-invasive techniques. The Northwestern group of Velasco has been a member of the CLIC Test Facility 3 (CTF3) collaboration since 2003, and the beam instrumentation work is developed mostly at this facility1. This 4 kW electron beam facility has a 25-170 MeV electron LINAC. CTF3 performed a set of dedicated measurements to finalize the development of our RF-Pickup bunch length detectors. The RF-pickup based on mixers was fully commissioned in 2009 and the RF-pickup based on diodes was finished in time for the 2010-11 data taking. The analysis of all the data taken in by the summer of 2010 was finish in time and presented at the main conference of the year, LINAC 2010 in Japan.

  14. Final Report to DOE

    SciTech Connect (OSTI)

    Ismail Gultepe

    2012-05-15

    This final report summarizes the accomplished goals and provide a list of the publications and presentations made during the project. The goals of the project were accomplished through the various publications submitted to Journals and presentations done at the DOE and international meetings and conferences. The 8 journal articles related to the goals of this project were accepted or submitted. The 23 presentations related to goals of the project were presented at the meetings. There were some minor changes regarding to project goals because of issues encountered during the analysis of the data. For example, a total water probe sensor mounted on the Convair-580 that can be used for defining mixed phase conditions and parameterization, had some problems to estimate magnitude of total water mass, and this resulted in issues providing an accurate parameterization for cloud fraction. Variability related aerosol number concentrations and their composition for direct and indirect effects were studied and published. Results were given to explain aerosol and ice microphysical effects on climate change studies. It is suggested that developed parameterizations should consider the variability in aerosol and ice parameters over the Arctic regions.

  15. Risk Assessment & Management Information

    Broader source: Energy.gov [DOE]

    NRC - A Proposed Risk Management Regulatory Framework, April 2012 Risk Assessment Technical Experts Working Group (RWG) web page DOE Standard on Development and Use of Probabilistic Risk Assessment in DOE Nuclear Safety Applications (draft), December 2010 Consortium for Risk Evaluation with Stakeholder Participation Workshop on Risk Assessment and Safety Decision Making Under Uncertainty

  16. MTX final report

    SciTech Connect (OSTI)

    Hooper, E.B.; Allen, S.L.; Brown, M.D.; Byers, J.A.; Casper, T.A.; Cohen, B.I.; Cohen, R.H.; Fenstermacher, M.E.; Foote, J.H.; Hoshino, K.

    1994-01-01

    The MTX experiment was proposed in 1986 to apply high frequency microwaves generated by a free-electron laser (FEL) to electron cyclotron resonance heating (ECRH) in a high field, high density tokamak. As the absorption of microwaves at the electron cyclotron resonance requires high frequencies, the opportunity of applying a free-electron laser has appeal as the device is not limited to frequencies in the microwave or long millimeter wavelength regions, in contrast to many other sources. In addition, the FEL is inherently a high power source of microwaves, which would permit single units of 10 MW or more, optimum for reactors. Finally, it was recognized early in the study of the application of the FEL based on the induction linear accelerator, that the nonlinear effects associated with the intense pulses of microwaves naturally generated would offer several unique opportunities to apply ECRH to current drive, MHD control, and other plasma effects. It was consequently decided to adapt the induction accelerator based FEL to heating and controlling the tokamak, and to conduct experiments on the associated physics. To this end, the Alcator C tokamak was moved from the Massachusetts Institute of Technology (MIT) to the Lawrence Livermore National Laboratory where it was installed in Building 431 and operated from March, 1989, until the conclusion of the experiment in October, 1992. The FEL, based on the ETA-11 accelerator and IMP wiggler was brought into operation by the LLNL Electron Beam Group and power injected into the tokamak during an experimental run in the Fall, 1989. Following an upgrade by the MTX group, a second experimental run was made lasting from the Winter, 1992 through the end of the experiment. Significant contributions to the ECRH experiments were made by the Japan Atomic Energy Research Institute (JAERI).

  17. Role of LEPCs in risk management and risk communication

    SciTech Connect (OSTI)

    Mannan, M.

    1995-12-31

    Under Section 112(r) of Title III of the Clean Air Act Amendments, the US Environmental Protection Agency (EPA) is required to develop regulations that would require development and implementation of risk management programs at facilities that manufacture, process, use, store, or otherwise handle regulated substances in quantities that exceed specified threshold quantities. On January 31, 1994, EPA published the final rule establishing the List of Regulated Substances and Thresholds for Accidental Release Prevention. The proposed rule will require covered facilities to develop and implement a risk management program. The proposed rule will also require facilities to communicate various information to the local emergency planning committee (LEPC). This information may be provided in the form of consultation and communication during the development of various elements of the risk management program and/or by providing access to the risk management plan (RMP). These requirements not only place an additional regulatory burden on facilities but also create the need for the LEPCs to start planning for strategies to deal with significant amount of technical information in a meaningful and effective manner. This paper presents a summary of EPA`s proposed rule, the role of LEPCs in the implementation of many aspects of the rule, and a description of the potential contents of an RMP. Covered facilities as well as the LEPCs may gain a significant advantage by engaging in early dialogue and proactive education to determine mutual needs.

  18. Fuzzy Risk Analyzer

    Energy Science and Technology Software Center (OSTI)

    1994-03-04

    FRA is a general purpose code for risk analysis using fuzzy, not numeric, attributes. It allows the user to evaluate the risk associated with a composite system on the basis of the risk estimates of the individual components.

  19. LIVE_NSB_final.wmv

    ScienceCinema (OSTI)

    None

    2010-09-01

    National Science Bowl finals and awards at the National Building Museum in Washington D.C. Monday 5/3/2010

  20. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE August 9, 2012 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Committee Business ...................................................................................................................................... 4 Attachments

  1. EA-1637: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    10 CFR 431 Energy Conservation Program for Commerical and Industrial Equipment: Packaged Terminal Air Conditioner and Packaged Terminal Heat Pump Energy Conservation Standards; Final Rule

  2. Enterprise Risk Management Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Framework The Enterprise Risk Management (ERM) framework includes four steps: identify the risks, determine the probability and impact of each one, identify controls that are...

  3. Final_Testimony(26).pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    enable organizations to proactively manage risk. Ensuring the cyber security of a modern, digital electricity infrastructure is a key objective of national smart grid efforts. As a...

  4. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    SciTech Connect (OSTI)

    Jones, M.E.; Shain, D.I.

    1994-05-01

    The Rocky Flats Plant is developing, with active stakeholder a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates. These postulated options or endstates can be various remedial alternatives, or future endstate uses of federal agency land. Currently, there does not exist any approved methodology that aggregates various incremental risk estimates. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges.

  5. Webinar: Genetically Modified Algae: A Risk-Benefit Assessment | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Webinar: Genetically Modified Algae: A Risk-Benefit Assessment Webinar: Genetically Modified Algae: A Risk-Benefit Assessment Genetically Modified (GM) Algae: A Risk-Benefit Assessment PDF icon gm_algae_webinar_october_2014 More Documents & Publications National Alliance for Advanced Biofuels and Bioproducts Synopsis (NAABB) Final Report National Alliance for Advanced Biofuels and Bioproducts Synopsis (NAABB) Hydrogen, Fuel Cells and Infrastructure Technologies Program: 2002

  6. Final Report Strings 2014

    SciTech Connect (OSTI)

    Witten, Edward

    2015-10-21

    DOE Final Report “Strings 2014” PI: Edward Witten, Institute for Advanced Study, Princeton, NJ 08540 CO-PI: Igor Klebanov, Princeton University, Princeton, NJ 08540 DOE Grant Number: DE-SC0011919 The Strings 2014 meeting was held at Princeton University in June 2014, co-sponsored by Princeton University and the Institute for Advanced Study. Plenary lectures at Strings 2014 were held in Richardson Auditorium of Princeton University. This comfortable and spacious facility easily accommodated the 616 participants registered participants at Strings 2014. The rental fee for the auditorium was $11,000. This grant provided $5,500 from the Department of Energy to pay for one-half of the cost of the facility rental and videotaping. Speakers were supported with funds from the National Science Foundation Clay Mathematics Institute, the Institute for Advanced Study and Princeton University. The organization of Strings 2014 consisted of an International Organizing Committee of 60 prominent scientists around the world, and a Local Advisory Committee consisting of an additional 15 distinguished scientists from neighboring institutions. Additionally, the Local Organizing Committee assisted them with about 15 members (mostly faculty at Princeton University and the Institute for Advanced Study). These groups (which are listed at the end of this narrative) offered important input concerning the selection of speakers and helped to ensure that the speakers were selected from the broadest possible pool. The conference was held on June 23-7 at Princeton University and the Institute for Advanced Study. The 616 registered participants included 272 participants from the United States and 344 from 32 institutions outside of the U.S. We believe that we were successful at providing a stimulating and up-to-date overview of research in string theory and its relations to other areas of physics and mathematics, ranging from geometry to quantum field theory, condensed matter physics, and more. There were a total of 45 plenary speakers and 27 speakers at parallel sessions. (Parallel sessions were held at the Institute for Advanced Study.) Overall the speakers did an excellent job of presenting their topics and some presented surprising and novel results. The talks at Strings 2014 were videotaped and are available on the conference website: http://physics.princeton.edustrings2014/Talk_titles.shtml. One important facet of Strings 2014 and one of the reasons it was so well-attended was that it had a strong educational component. The week before the meeting, there was a summer school, Prospects in Theoretical Physics (PiTP), held at the Institute for Advanced Study on the subject of string theory. 260 graduate students attended both PiTP and Strings 2014. The group consisted of 25 females and 235 males; 208 graduate students and 52 postdocs. 129 participants were from the United States, and 131 participants came from institutions in 25 countries outside of the U.S. The Institute for Advanced Study substantially subsidized the summer school for students. Over two dozen students had the chance to give short (six minute) talks at the “gong shows” that were held at PiTP and Strings 2014, and nearly 60 students and postdocs made poster presentations at Strings 2014.

  7. Final Technical Report

    SciTech Connect (OSTI)

    Shayya, Walid

    2007-03-20

    The state of New York through the New York State Energy Research and Development Authority (NYSERDA) has developed a suite of digester projects throughout the state to assess the potential for anaerobic digestion systems to improve manure management and concurrently produce energy through the production of heat and electrical power using the biogas produced from the digesters. Dairies comprise a significant part of the agribusiness and economy of the state of New York. Improving the energy efficiency and environmental footprint of dairies is a goal of NYSERDA. SUNY Morrisville State College (MSC) is part of a collection of state universities, dairy farms, cooperatives, and municipalities examining anaerobic digestion systems to achieve the goals of NYSERDA, the improvement of manure management, and reducing emissions to local dairy animal sites. The process for siting a digester system at the MSC’s free-stall Dairy Complex was initiated in 2002. The project involved the construction of an anaerobic digester that can accommodate the organic waste generated at Dairy complex located about a mile southeast of the main campus. Support for the project was provided through funding from the New York State Energy Research and Development Authority (NYSERDA) and the New York State Department of Agriculture and Markets. The DOE contribution to the project provided additional resources to construct an expanded facility to handle waste generated from the existing free-stall dairy and the newly-constructed barns. Construction on the project was completed in 2006 and the production of biogas started soon after the tanks were filled with the effluent generated at the Dairy Complex. The system has been in operation since December 17, 2006. The generated biogas was consistently flared starting from December 20, 2006, and until the operation of the internal combustion engine/generator set were first tested on the 9th of January, 2007. Flaring the biogas continued until the interconnect with the power grid was approved by NYSEG (the electrical power provider) and the combined heat and power generation (CHP) system was authorized to start on February 27, 2007. The system has been in operation since February 28, 2007, and is generating 45 to 50 kW of electrical power on continuous basis. The completed project will ultimately allow for investigating the facility of utilizing organic waste from a dairy operation in a hard-top plug-flow methane digester with the ultimate goal of reducing environmental risk, increasing economic benefits, and demonstrating the viability of an anaerobic methane digestion system. Many benefits are expected as a result of the completed project including our better understanding of the anaerobic digestion process and its management as well as the facility to utilize the methane digester as a demonstration site for dairy producers, farmers, and organic waste producers in New York State and the Northeast. Additional benefits include helping current and future students in dairy science and technology, agricultural business, environmental sciences, agricultural engineering, and other disciplines develop better understanding of underutilized biomass alternative energy technologies, environmental conservation, environmental stewardship, and sustainable agriculture.

  8. Final ECR 2008 Report | Department of Energy

    Energy Savers [EERE]

    Final ECR 2008 Report Final ECR 2008 Report Final ECR 2008 Report PDF icon Environmental Conflict Resolution Third Annual Report January 2009 More Documents & Publications Environmental Conflict Resolution 2009 ECR FINAL REPORT 2010 test

  9. Final Technical Report

    SciTech Connect (OSTI)

    Stenzel, Reiner; Urrutia, J. Manuel

    2009-09-08

    The nonlinear physics of electron magnetohydrodynamics (EMHD) in plasmas. Time-varying wave magnetic field exceeding the background magnetic field produces highly nonlinear whistler mode since the wave dispersion depends on the total magnetic field. There exists no theory for such whistler modes. The present experimental work is the first one to explore this regime of nonlinear whistlers. A field-reversed configuration has been found which has the same vortex topology as an MHD spheromak, termed a whistler spheromak. Whistler mirrors have compressed and twisted field lines propagating in the whistler mode. Their helicity properties have been studied. Whistler spheromaks and mirrors have different propagation and damping characteristics. Wave collisions have been studied. Head-on collisions of two whistler spheromaks form a stationary field-reversed configuration (FRC) without helicity. When whistler spheromaks are excited the toroidal current flows mainly in the toroidal null line. It is only carried by electrons since ion currents and displacement currents are negligible. A change in the poloidal (axial) magnetic field induces a toroidal electric field which drives the current. Magnetic energy is dissipated and converted into electron kinetic energy. This process is called magnetic reconnection in 2D geometries, which are simplifications for theoretical convenience but rarely occur in nature. A crucial aspect of reconnection is its rate, determined by the electron collisionality. Regular Coulomb collisions can rarely account for the observed reconnection rates. In the present experiments we have also observed fast reconnection and explained it by electron transit time damping in the finite-size null layer. Electrons move faster than a whistler spheromak, hence transit through the toroidal null line where they are freely accelerated. The transit time is essentially the collision time but no particle collisions are required. Strong electron heating and visible light emissions are only observed in whistler spheromaks and FRCs but not in mirrors or asymmetric configurations lacking magnetic null lines. The collisionless electron energization in a toroidal null line usually produces non-Maxwellian distributions. Off the null axis electrons gain more perpendicular than parallel energy. Distributions with T{sub {perpendicular}} > T{sub {parallel}} lead to whistler instabilities which have been observed. A whistler spheromak is a source of high-frequency whistler emissions. These are usually small amplitude whistlers propagating in a complicated background magnetic field. The waves are emitted from a moving source. High frequency whistlers propagate faster than the spheromak, thus partly move ahead of it and partly in the reverse direction. In test wave experiments wave growth opposite to the direction of the hot electron flow has been observed, confirming that Doppler-shifted cyclotron resonance instabilities account for the emission process. Propagating whistler mirrors produce no significant instabilities except when they interact with other fields which exhibit null lines. For example, a whistler mirror has been launched against a stationary FRC, resulting in strong FRC heating and whistler instabilities. In the whistler mirror configuration the antenna near-zone field produces a toroidal null line outside the coil which can also become a source for whistler emissions. Finally, nonlinear EMHD research has been extended to initially unmagnetized plasmas where a new nonlinear skin depth has been discovered. When a small-amplitude oscillating magnetic field is applied to a plasma the field penetration is governed by the skin depth, collisional or collisionless depending on frequency, collision frequency and plasma frequency. However, when the magnetic field increases the electrons become magnetized and the field penetration occurs in the whistler mode if the cyclotron frequency exceeds the oscillating frequency. This phenomenon has been observed. A loop antenna creates a dipole field which is frozen into the plasma for a half cycle and becomes the background field for the wave launched by the next half cycle. The field topology consists of field-reversed dipoles of decreasing strength with distance. The propagation region depends on field amplitude but not on the skin depth. Our research has been published in 13 scientific papers.

  10. FinalProgramReportfinal.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 8, 2004 Paul Wambach EH-53/270 Corporate Square Building U. S. Department of Energy 1000 Independence Avenue, SW Germantown, MD 20585-0270 CONTRACT NO. DE-AC05-00OR22750: FY04 FINAL REPORT FOR THE FORMER RADIATION WORKER MEDICAL SURVEILLANCE PROGRAM AT ROCKY FLATS The enclosed subject final report prepared by Joe M. Aldrich is submitted as stated in the Fiscal Year 2004 Field Work Proposal for the Former Radiation Worker Medical Surveillance Program at Rocky Flats. This is the final

  11. Hawaii Clean Energy Final PEIS

    Office of Environmental Management (EM)

    A 1 2 Public Notices 3 Notices about the Draft Programmatic EIS Appendix A Hawai i Clean Energy Final PEIS A-1 September 2015 DOE/EIS-0459 The following Notice of Availability appeared in the Federal Register on April 18, 2014. Appendix A Hawai i Clean Energy Final PEIS A-2 September 2015 DOE/EIS-0459 Appendix A Hawai i Clean Energy Final PEIS A-3 September 2015 DOE/EIS-0459 DOE-Hawaii placed the following advertisement in The Garden Island on May 5 and 9, 2014. Appendix A Hawai i Clean Energy

  12. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 12, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE November 12, 2014 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 100 F-Area Record of Decision .................................................................................................................... 1 Central Plateau Inner Area Cleanup

  13. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 13, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE November 13, 2014 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tank Farm Vapor Issues (joint w/ HSEP) .................................................................................................... 1 Direct Feed Low-Activity Waste Treatment

  14. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 10, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE March 10, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Central Plateau Inner Area Guidelines .......................................................................................................... 1 2014/15 Budget and RL Cleanup, Lifecycle

  15. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 11, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE March 11, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Cesium Treatment and Disposition Issue Manager Update .......................................................................... 2 Waste Treatment Plant Issue Manager Update

  16. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 15, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE April 15, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 C-Farm Closure Swim Lanes ........................................................................................................................ 2 PHOENIX Tank Farms Application

  17. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 23, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE September 23, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Low-Activity Waste Pretreatment System Critical Decision - 1 .................................................................. 3 A and AX Farms Retrieval

  18. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 8, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE December 8, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Update on 100-D/H Proposed Plan ............................................................................................................... 2 WA-1 Remedial Investigation/Feasibility

  19. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 18, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY, AND ENVIRONMENTAL PROTECTION COMMITTEE June 18, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tank Farm Vapors Advice Response ............................................................................................................ 1 Effectiveness of

  20. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 9, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY AND ENVIRONMENTAL PROTECTION COMMITTEE August 9, 2012 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Draft Advice - Integrated Safety Management ............................................................................................ 2 DOE-RL Maintenance

  1. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 5, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT COMMITEE March 5, 2014 Kennewick, WA Topics in this Meeting Summary Welcome and Introduction ............................................................................................................................ 1 State of the Site Meetings ............................................................................................................................. 2 RCRA Permit Modifications

  2. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Communication Committee April 7, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE April 7, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 TPA Public Involvement Survey ..................................................................................................................

  3. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 3, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT COMMITTEE September 3, 2014 Pasco, WA Topics in this Meeting Summary Welcome ....................................................................................................................................................... 1 PIC Role Framing ......................................................................................................................................... 1 State of the Site Meetings

  4. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 8, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE September 8, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 TPA Public Involvement ............................................................................................................................... 1 TPA

  5. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 3, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE November 3, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Agency Public Involvement ....................................................................................... 2 Waste Treatment Plant

  6. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 10, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT COMMITEE December 10, 2013 Richland, WA Topics in this Meeting Summary Welcome ....................................................................................................................................................... 1 Strategic Public Involvement - Tool Time! .................................................................................................. 3 100-F Area Public Involvement

  7. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 6, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE March 6, 2013 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Briefing on Post-2015 Priorities ................................................................................................................... 1 Update on Deep Vadose Zone Remediation

  8. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE October 9, 2012 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Natural Resource Damage Assessment (NRDA) Injury Assessment Plan ................................................... 3 100 Area Schedule for Documents/Decisions

  9. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE November 6, 2012 Richland, WA Topics in this Meeting Summary Opening ........................................................................................................................................... 1 F-Reactor Area Operable Unit ........................................................................................................ 1 Plutonium Finishing Plant (PFP) Update

  10. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 13, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE November 13, 2013 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Update on Work in the River Corridor ......................................................................................................... 1 Briefing on the Plutonium Finishing

  11. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE February 13, 2014 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 DOE Framework Topic Briefing: Direct Feed Low-Activity Waste ............................................................ 1 System Plan 7

  12. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 7, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE November 7, 2012 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Update on Double-Shell Tank AY-102 ........................................................................................................ 1 Update on Single-Shell Tank Retrievals

  13. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 8, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE October 8, 2014 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Safety Culture Improvement Efforts (joint w/ HSEP) .................................................................................. 1 Waste Treatment and Immobilization Plant Progress

  14. Final Report: Axion "Roadmap" Workshop

    SciTech Connect (OSTI)

    Rosenberg, Leslie J

    2013-03-19

    Final report for "Vistas in Axion Physics: A Roadmap for Theoretical and Experimental Axion Physics through 2025", which was held at the University of Washington, INT, from April 23 - 26, 2012.

  15. Hanford_FinalReport_20140130

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    209054 - Hanford PSHA Seismicity Analysis - Felix Waldhauser - Final Report - 1/31/14 3:37 PM 1 Final Report Project Name: Hanford Site-Wide Probabilistic Seismic Hazard Analysis (PSHA): High-Resolution Seismicity Analysis of the Yakima Fold and Thrust Belt Region, Washington Contract Number: Battelle - 209054 Prepared by: Dr. Felix Waldhauser 423 W 120 th Street, Apt 88 New York, NY 10027 Tel: 212 678 4804 Email: felixw@ldeo.columbia.edu Prepared for: Pacific Northwest National Laboratory

  16. Loan Specialist (Risk Management)

    Broader source: Energy.gov [DOE]

    This position is located in the U.S. Department of Energy (DOE), Loan Programs Office (LPO), Risk Management Division (RMD), and Enterprise Risk Management & Compliance Branch. The LPO mission...

  17. Enterprise Risk Management Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Model The Enterprise Risk Management (ERM) Model is a system used to analyze the cost and benefit of addressing risks inherent in the work performed by the Department of Energy....

  18. State Energy Risk Assessment Initiative - State Energy Risk Profiles...

    Energy Savers [EERE]

    Mission Energy Infrastructure Modeling and Analysis State Energy Risk Assessment Initiative - State Energy Risk Profiles State Energy Risk Assessment Initiative - State...

  19. FINAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of Introduction DOEEA-1712 1-4 electric drive vehicles would support the DOE's Energy Strategic Goal of "protecting our national and economic security by promoting a diverse...

  20. Topographical Risk Assessment

    Energy Science and Technology Software Center (OSTI)

    2002-09-24

    TRA was developed as a computer tool for the DOE Office of River Protection (ORP) that will provides the capability to visualize and rapidly understand information about the risks associated with the River protection Project (RPP). Previously, technical and programmatic risk management within ORP had relied heavily on risk lists and other techniques that presented risk information but did not place it in perspective of the overall project. This made it difficult for ORP seniormore » management to understand the risk information presented, prioritize their activities, and provide direction to ORP staff and contractors about how to manage specific risk events. The TRA visualization tool, provides the appropriate context and perspective that allows senior management to effectively manage risks. Basically, the TRA overlays information about risks associated with specific activities and their magnitudes on top of the project baseline schedule. this provides senior management with information about the magnitudes of specific risk events as well as their timing, and allows them to focus their attention and resources on the risks that merit attention and possible further action. The TRA tool can also be used to display other types of information associated with scheduled activities, such as cost to date, technical performance, schedule performance, etc. Additionally, the base of the 3-dimensional representation can be changed to other types of graphics, such as maps, process flow diagrams, etc., which allows the display of other types of informatio, such as hazards, health and safety risks, and system availability.« less

  1. Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Dr. Michael Strasik

    2007-06-29

    Boeing Phantom Works and its team originally proposed a three-year Phase III SPI project to develop a 30-kWh flywheel with a 100 kW power capability as a power risk management system (RMS) for power users and providers. The chief objectives for the Risk Management System Flywheel were to (1) demonstrate its ability to protect a critical load such as a small data center from swings in power availability, cost, and power factor and (2) show that the RMS flywheel can perform these functions with reduced noise, emissions, and operating costs when compared with non-HTS competitors including batteries, diesel generators, and microturbines.

  2. MINIMARS conceptual design: Final report

    SciTech Connect (OSTI)

    Lee, J.D.

    1986-09-01

    This volume contains the following sections: (1) fueling systems; (2) blanket; (3) alternative blanket concepts; (4) halo scraper/direct converter system study and final conceptual design; (5) heat-transport and power-conversion systems; (6) tritium systems; (7) minimars air detritiation system; (8) appropriate radiological safety design criteria; and (9) cost estimate. (MOW)

  3. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Health, Safety, and Environmental Protection Committee November 8, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH SAFETY AND ENVIRONMENTAL PROTECTION COMMITTEE November 8, 2012 Richland, WA Topics in this Meeting Summary Opening ............................................................................................................................................................ 1 DOE-ORP's Response to HAB Advice #258 (Safety at the Waste Treatment and Immobilization Plant [WTP]) -

  4. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE May 6, 2014 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Advice Development: 100-F Remedial Investigation and Feasibility Study (RI/FS) and Proposed Plan Revision 0

  5. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 11, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE December 11, 2014 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 100-F Area ROD, Follow-up to HAB Advice #280 ..................................................................................... 1 Central Plateau Inner Area Cleanup Principles

  6. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 9, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE December 9, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Update on the Status of Double-Shell Tank AY-102.................................................................................... 1 Safety Culture (joint w/ HSEP)

  7. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 10, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY, AND ENVIRONMENTAL PROTECTION COMMITTEE December 10, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Enterprise Assessment of Safety Culture at the Waste Treatment and Immobilization Plant (joint w/ TWC)

  8. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 5, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT & COMMUNICATION COMMITTEE June 5, 2013 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Results of Recent Hanford Public Involvement Surveys .............................................................................. 2 Planning for the State of the Site

  9. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 7, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE January 7, 2014 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Briefing on 100-F Remedial Investigation/Feasibility Study and Proposed Plan (Revision 0) .................... 1 Briefing on the Annual Hanford Site Groundwater Monitoring Report

  10. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River and Plateau Committee January 8, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE January 8, 2013 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement (TPA) Change Package............................................................................................... 1 100 F/IU Operable

  11. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE April 9, 2013 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Briefing on 300 Area Remedial Investigation/Feasibility Study and Proposed Plan Revision 0 ................. 1 Briefing on ROD Development for 100-F Area

  12. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 10, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE June 10, 2014 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Briefing on Interim Storage of Transuranic and Mixed Waste at the Central Waste Complex .................... 1 Update on the Plutonium Finishing Plant

  13. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE January 9, 2013 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Update on Double-Shell Tank AY-102 (joint with PIC) .............................................................................. 1 Issue Manager Framing: Radiation Damage to Concrete at the Waste

  14. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Page 1 Health, Safety and Environmental Protection Committee May 8, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY, AND ENVIRONMENTAL PROTECTION COMMITTEE May 8, 2014 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Hanford Site Policies and Procedures for Worker Injuries and Illnesses (joint w/ TWC)

  15. Final Rule (October 23, 2007)

    Broader source: Energy.gov [DOE]

    Loan Guarantees for Projects That Employ Innovative Technologies; Final Rule: On May 16, 2007, the Department of Energy (DOE or the Department) published a Notice of Proposed Rulemaking and opportunity for comment (NOPR) to establish regulations for the loan guarantee program authorized by Title XVII of the Energy Policy Act of 2005 (Title XVII or the Act).

  16. Expedited technology demonstration project final report: final forms

    SciTech Connect (OSTI)

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  17. Congressional Final House Final Senate Current Request Mark

    Office of Environmental Management (EM)

    FY 2010 FY 2010 FY 2010 ($ in thousands) Congressional Final House Final Senate Current Request Mark Mark Appropriation FOSSIL ENERGY R&D Coal 368,865 394,315 428,200 393,485 Natural Gas Technologies 25,000 25,000 25,000 17,364 Unconventional Fossil Energy Technologies 0 0 25,000 19,474 Program Direction 158,000 158,000 158,000 158,000 Plant & Capital Equipment 20,000 20,000 20,000 20,000 Environmental Restoration 10,000 10,000 10,000 10,000 Cooperative Res. & Development 0 0 5,000

  18. Risk Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Risk Analysis Almost any new technology involves some risk. Risks involved in working with ... (FMEA), a risk mitigation plan, and a communication plan, is used as a criterion for the ...

  19. Sociocultural definitions of risk

    SciTech Connect (OSTI)

    Rayner, S.

    1990-10-01

    Public constituencies frequently are criticized by technical experts as being irrational in response to low-probability risks. This presentation argued that most people are concerned with a variety of risk attributes other than probability and that is rather irrational to exclude these from the definition and analysis of technological risk. Risk communication, which is at the heart of the right-to-know concept, is described as the creation of shared meaning rather than the mere transmission of information. A case study of utilities, public utility commissions, and public interest groups illustrates how the diversity of institutional cultures in modern society leads to problems for the creation of shared meanings in establishing trust, distributing liability, and obtaining consent to risk. This holistic approach to risk analysis is most appropriate under conditions of high uncertainty and/or decision stakes. 1 fig., 5 tabs.

  20. Ozone Risk Assessment Utilities

    Energy Science and Technology Software Center (OSTI)

    1999-08-10

    ORAMUS is a user-friendly, menu-driven software system that calculates and displays user-selected risk estimates for health effects attributable to short-term exposure to tropospheric ozone. Inputs to the risk assessment are estimates of exposure to ozone and exposure-response relationships to produce overall risk estimates in the form of probability distributions. Three fundamental models are included: headcount risk, benchmark risk, and hospital admissions. Exposure-response relationships are based on results of controlled human exposure studies. Exposure estimates aremore » based on the EPA''s probabilistic national ambient air quality standards (NAAQS) exposure model, pNEM/Osub3, which simulates air quality associated with attainment of alternative NAAQS. Using ORAMUS, risk results for 27 air quality scenarios, air quality in 9 urban areas, 33 health endpoints, and 4 chronic health endpoints can be calculated.« less

  1. Ecological Risk Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community, Environment » Environmental Stewardship » Environmental Protection » Ecological Risk Assessments Ecological Risk Assessments Ecological risk assessment is the appraisal of potential adverse effects of exposure to contaminants on plants and animals. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email The ECORISK Database is a screening tool that helps scientists evaluate impacts on LANL's ecology. Assessing our

  2. Secretary Bodman Announces Federal Risk Insurance for Nuclear Power Plants

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Touts Robust Economy | Department of Energy Federal Risk Insurance for Nuclear Power Plants & Touts Robust Economy Secretary Bodman Announces Federal Risk Insurance for Nuclear Power Plants & Touts Robust Economy August 4, 2006 - 8:42am Addthis ATLANTA, GA - After touring Georgia Power and speaking to its employees, U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced completion of the final rule that establishes the process for utility companies building

  3. A risk assessment software tool for evaluating potential risks to human health and the environment

    SciTech Connect (OSTI)

    Drendel, G.; Allen, B.; Gentry, R.; Shipp, A.; Van Landingham, C.

    1994-12-31

    The Ecology and National Environmental Policy Act Division (END), is providing a sitewide evaluation of alternative strategies for the final disposition of the Rocky Flats Plant material inventory. This analysis is known as the Systems Engineering Analysis (SEA) for the Rocky Flats Plant. The primary intent of the SEA is to support the Rocky Flats Plant decision-making. As part of the SEA project, a risk assessment software tool has been developed which will assist in the analysis by providing an evaluation of potential risks to human health and the environment for the purpose of augmenting future decisions at the site.

  4. Probabilistic Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy ...

  5. Environmental Risk Assessment

    Broader source: Energy.gov [DOE]

    PPPO subject-matter experts analyze possible environmental hazards and provide risk assessment information to help inform various environmental decision-making processes.

  6. Final DOE Areas Feasibility Study

    Office of Legacy Management (LM)

    Management, Washington, DC Weiss Associates Environmental Science, Engineering and Management FINAL DOE AREAS FEASIBILITY STUDY for the: LABORATORY FOR ENERGY-RELATED HEALTH RESEARCH UNIVERSITY OF CALIFORNIA, DAVIS Prepared for: SM Stoller Corporation 2597 B Âľ Road Grand Junction, Colorado 81503 Prepared by: Weiss Associates 5801 Christie Avenue, Suite 600 Emeryville, California 94608-1827 March 07, 2008 Rev. 0 J:\DOE_STOLLER\4110\143\FEASIBILITY_STUDY\20080307_FS_TEXT_REV0.DOC WEISS ASSOCIATES

  7. Final Design RM | Department of Energy

    Energy Savers [EERE]

    Final Design RM Final Design RM The Final Design (FD) Review Module (RM) is a tool that assists Department of Energy (DOE) federal project review teams in evaluating the technical sufficiency of the final design prior to CD-3 approval. The FD RM focuses on the engineering design, technology, safety, and quality assurance to determine whether it meets overall design commitments, technical and safety requirements. PDF icon Final Design RM More Documents & Publications Seismic Design

  8. Nuclear Facility Risk Ranking

    Broader source: Energy.gov [DOE]

    The CNS has purview of over ninety EM nuclear facilities across the DOE complex. To ensure that limited resources are applied in a risk-informed and balanced approach, the CNS performed a methodical assessment of the EM nuclear facilities. This risk-informed approach provides a data-driven foundation on which to construct a balanced set of operating plans and staff assignments.

  9. Field practice internship final report

    SciTech Connect (OSTI)

    Foster, T.

    1994-05-01

    This field practice internship final report gives an overview of the field practice, which was completed at the Oak Ridge Y-12 Plant, Martin Marietta Energy Systems, Inc., Environmental Management Department, Oak Ridge, Tennessee. The field practice focused on the completion of the Superfund Amendments and Reauthorization Act (SARA) Title III, Emergency Planning and Community Right-to-Know Act Section 312, Tier II Report. The field practice internship was conducted on a full-time basis between December 13, 1993 through February 18, 1994. Sheila Poligone, Emergency Planning and Community Right-to-Know Act (EPCRA) Coordinator served as the field practice preceptor.

  10. Microsoft Word - REPORT.13.final

    Office of Scientific and Technical Information (OSTI)

    Grantee The George Washington University Department of Chemistry 725 21 st St., NW Corcoran Hall Washington, DC 20052 Grant Number DE-FG02-02ER15366 Project Title Interface Induced Carbonate Mineralization: A Fundamental Geochemical Process Relevant to Carbon Sequestration P/I Dr. H. Henry Teng 202-994-0112 hteng@gwu.edu Co-PI Dr. Huifang Xu Dept. Geoscience University of Wisconsin-Madison 1215 W Dayton St Madison, WI 53706 FINAL REPORT Background Vast majority of literature work concludes that

  11. Virtualized Network Control. Final Report

    SciTech Connect (OSTI)

    Ghani, Nasir

    2013-02-01

    This document is the final report for the Virtualized Network Control (VNC) project, which was funded by the United States Department of Energy (DOE) Office of Science. This project was also informally referred to as Advanced Resource Computation for Hybrid Service and TOpology NEtworks (ARCHSTONE). This report provides a summary of the project's activities, tasks, deliverable, and accomplishments. It also provides a summary of the documents, software, and presentations generated as part of this projects activities. Namely, the Appendix contains an archive of the deliverables, documents, and presentations generated a part of this project.

  12. UM-ASU Final Report

    Office of Scientific and Technical Information (OSTI)

    8 21 UM-ASU Final Report Assessing the Role of Iron Sulfides in the Long Term Sequestration of Uranium by Sulfate-Reducing Bacteria Grant Number: DE-SC0001642 December 31, 2013 Report Period: September 1, 2009 to August 31, 2013 Kim F. Hayes (PI), Yuqiang Bi, Julian Carpenter, and Sung Pil Hyun University of Michigan Bruce E. Rittmann (co-PI), Chen Zhou, Raveender Vannela Arizona State University James A. Davis (co-I) LBNL Executive Summary This four-year project's overarching aim was to

  13. SPECIAL REREVIEW FINAL DETERMINATION UNCLASSIFIED

    Office of Legacy Management (LM)

    SPECIAL REREVIEW FINAL DETERMINATION UNCLASSIFIED , ?4~0180N SctuAnr P. 0. 00x *a STATION F New YORK, N. Y. IN RLPLY RCFSRTO EID?f A- 43 MS ~-7405 eng-8 ". Subject: Contract No.H-7405 eng-8 with Metal Hydrides Incorporated. MEMORAhDUM to the Files. 1. Reference is made to basi.c communication dated 27 September 1945, Symbol No. EIDM 1%-30-b, requesting certain information with respect to the subject contract. 2. Reference pars,?-raph a. The Government committed to restore Contractor's plant

  14. ReACT Methodology Proof of Concept Final Report

    SciTech Connect (OSTI)

    Bri Rolston; Sarah Freeman

    2014-03-01

    The Department of Energy’s Office of Electricity Delivery and Energy Reliability (DOE-OE) funded INL Researchers to evaluate a novel process for assessing and mitigating cyber security risks. The proof of concept level of the method was tested in an industry environment. This case study, plus additional case studies will support the further development of the method into a tool to assist industry in securing their critical networks. This report provides an understanding of the process developed in the Response Analysis and Characterization Tool (ReACT) project. This report concludes with lessons learned and a roadmap for final development of these tools for use by industry.

  15. Assessment of the risk of transporting liquid chlorine by rail

    SciTech Connect (OSTI)

    Andrews, W.B.

    1980-03-01

    This report presents the risk of shipping liquid chlorine by rail. While chlorine is not an energy material, there are several benefits to studying chlorine transportation risks. First, chlorine, like energy materials, is widely used as a feedstock to industry. Second, it is the major purification agent in municipal water treatment systems and therefore, provides direct benefits to the public. Finally, other risk assessments have been completed for liquid chlorine shipments in the US and Europe, which provide a basis for comparison with this study. None of the previous PNL energy material risk assessments have had other studies for comparison. For these reasons, it was felt that a risk assessment of chlorine transportation by rail could provide information on chlorine risk levels, identify ways to reduce these risks and use previous studies on chlorine risks to assess the strengths and weaknesses of the PNL risk assessment methodology. The risk assessment methodology used in this study is summarized. The methodology is presented in the form of a risk assessment model which is constructed for ease of periodic updating of the data base so that the risk may be reevaluated as additional data become available. The report is sectioned to correspond to specific analysis steps identified in the model. The transport system and accident environment are described. The response of the transport system to accident environments is described. Release sequences are postulated and evaluated to determine both the likelihood and possible consequences of a release. Supportive data and analyses are given in the appendices. The risk assessment results are related to the year 1985 to allow a direct comparison with other reports in this series.

  16. GDB - Human Genome Database final report

    SciTech Connect (OSTI)

    Talbot, C. Conover, Jr.

    2002-01-08

    This is the DOE final report for the GDB, Human Genome Database, project at the Johns Hopkins University.

  17. Final Uranium Leasing Program Programmatic Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) Final Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) Uranium Leasing...

  18. Bio Risk Assessment Tool

    Energy Science and Technology Software Center (OSTI)

    2004-07-22

    The Biosecurity Risk Assessment Tool (BRAT) is a new type of computer application for the screening-level assessment of risk to dairy operations. BRAT for Dairies is designed to be intuitive and easy to use. Users enter basic data-property address, feed management, employee population, and so on - into the interface. Using these data and rules found in an expert system. BRAT for Dairies consults appropriate sections of its database. The expert system determines the riskmore » implications of the basic data, e.g. diseases are closely tied to pen location with respect to the outside world, When the analysis is complete, BRAT for Dairies evaluates and allocates the risk for each hazard, ranks the risks, and displays the results graphically.« less

  19. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-18

    This Guide provides non-mandatory risk management approaches for implementing the requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. Supersedes DOE G 413.3-7.

  20. CCSTF - Final Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CCSTF - Final Report CCSTF - Final Report PDF icon Carbon Capture and Storage Task Force - Final Report More Documents & Publications Before the Subcommittee on Energy -- House Science, Space, and Technology Committee Before the House Energy and Commerce Subcommittee on Oversight and Investigations

  1. Download the Final Agenda | Department of Energy

    Office of Environmental Management (EM)

    Download the Final Agenda Download the Final Agenda PDF icon SunShot Summit Agenda FINAL.pdf More Documents & Publications 2014 SunShot Summit Awardee Poster List Technology Forum Map and List of Awardees' Posters and Exhibits 2014 SunShot Initiative Concentrating Solar Power Subprogram Overview

  2. Risk in the Weapons Stockpile

    SciTech Connect (OSTI)

    Noone, Bailey C

    2012-08-14

    When it comes to the nuclear weapons stockpile, risk must be as low as possible. Design and care to keep the stockpile healthy involves all aspects of risk management. Design diversity is a method that helps to mitigate risk.

  3. Strategic Asia 2002 Final Report

    SciTech Connect (OSTI)

    Richard Ellings; Aaron Friedberg; Michael Wills

    2002-09-01

    The Strategic Asia Program made considerable progress over the course of 2002--the program's first year with support from the Department of Energy--and completed all its tasks on schedule and within budget. Following a planning meeting in Washington in February 2002, a team of leading specialists wrote a series of original assessments regarding the impact of September 11 on the strategic environment in Asia, examining how perceptions and strategies of countries in the region changed following the terrorist attacks. The final products, Strategic Asia 2002-03: Asian Aftershocks and its accompanying executive summary, were published in September 2002. The program's research findings (some of which are summarized) were presented to policymakers in Washington and elsewhere throughout the year, and almost 2,000 copies of the book had been distributed by mid-2003.

  4. Fort Polk EEAP. Final report

    SciTech Connect (OSTI)

    Busch, R.D.; Scheuch, K.E.; Shishman, T.T.

    1986-07-17

    This Final Presentation provides a summary of the work done under Increments A, B, E, and G of the Energy Engineering Analysis Program (EEAP) for Fort Polk Louisiana. The work was accomplished under Contract DACA63-80-C-0166 plus modifications with the Fort Worth District, Corps of Engineers. The vast majority of consumed energy at Fort Polk consists of electricity and natural gas. In FY75, Fort Polk used 48,399,000 kWh of electricity at a cost of $600,000. During that same period, 782,637 MCF of natural gas was purchased for $484,000. The total FY75 energy use was 1,368,327 MBtu.

  5. FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE MEETING

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2011 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE MEETING February 16, 2011 Richland, WA Topics in this Meeting Summary Welcome and Introductions .......................................................................................................................... 1 River Corridor Baseline Risk Assessment Plan ............................................................................................ 2 Update on Building 324 - B Cell Contamination

  6. Comparative risk analysis for the Rocky Flats Plant Integrated Project Planning

    SciTech Connect (OSTI)

    Jones, M.E.; Shain, D.I.

    1994-12-31

    The Rocky Flats Plant is developing a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risk from postulated options or endstates. Comparative Risk Analysis is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remedial options or future endstates. It addresses the cumulative risks imposed by the Rocky Flats Plant and provides risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures. Currently, there is no approved methodology that aggregates various risk estimates. Along with academic and field expert review, the Comparative Risk Analysis methodology is being reviewed and refined. A Rocky Flats Plant Risk Assessment Focus Group was established. Stakeholder involvement in the development provides an opportunity to influence the information delivered to a decision-maker. This paper discusses development of the methodology.

  7. 2009 ECR FINAL REPORT 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 ECR FINAL REPORT 2010 » 2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 PDF icon 2009 ECR Report More Documents & Publications test Final ECR 2008 Report Environmental Conflict Resolution

  8. The Enterprise Risk Management Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Enterprise Risk Management Model Using the Risk Assessment Tool to Prepare a Justification Memorandum for the Development and Revision of Departmental Directives * On January 14,...

  9. IRIS Final Technical Progress Report

    SciTech Connect (OSTI)

    M. D. Carelli

    2003-11-03

    OAK-B135 This NERI project, originally started as the Secure Transportable Autonomous Light Water Reactor (STAR-LW) and currently known as the International Reactor Innovative and Secure (IRIS) project, had the objective of investigating a novel type of water-cooled reactor to satisfy the Generation IV goals: fuel cycle sustainability, enhanced reliability and safety, and improved economics. The research objectives over the three-year (1999-2002) program were as follows: First year: Assess various design alternatives and establish main characteristics of a point design; Second year: Perform feasibility and engineering assessment of the selected design solutions; Third year: Complete reactor design and performance evaluation, including cost assessment These objectives were fully attained and actually they served to launch IRIS as a full fledged project for eventual commercial deployment. The program did not terminate in 2002 at the end of the NERI program, and has just entered in its fifth year. This has been made possible by the IRIS project participants which have grown from the original four member, two-countries team to the current twenty members, nine countries consortium. All the consortium members work under their own funding and it is estimated that the value of their in-kind contributions over the life of the project has been of the order of $30M. Currently, approximately 100 people worldwide are involved in the project. A very important constituency of the IRIS project is the academia: 7 universities from four countries are members of the consortium and five more US universities are associated via parallel NERI programs. To date, 97 students have worked or are working on IRIS; 59 IRIS-related graduate theses have been prepared or are in preparation, and 41 of these students have already graduated with M.S. (33) or Ph.D. (8) degrees. This ''final'' report (final only as far as the NERI program is concerned) summarizes the work performed in the first four years of IRIS, from October 1999 to October 2003. It provides a panoramic of the project status and design effort, with emphasis on the current status, since two previous reports have very extensively documented the work performed, from inception to early 2002.

  10. Biosafety Risk Assessment Model

    Energy Science and Technology Software Center (OSTI)

    2011-05-27

    Software tool based on a structured methodology for conducting laboratory biosafety risk assessments by biosafety experts. Software is based upon an MCDA scheme and uses peer reviewed criteria and weights. The software was developed upon Microsoft’s .net framework. The methodology defines likelihood and consequence of a laboratory exposure for thirteen unique scenarios and provides numerical relative risks for each of the relevant thirteen. The software produces 2-d graphs reflecting the relative risk and a sensitivitymore » analysis which highlights the overall importance of each factor. The software works as a set of questions with absolute scales and uses a weighted additive model to calculate the likelihood and consequence.« less

  11. Risk communications and the Chemical Stockpile Emergency-Planning Program

    SciTech Connect (OSTI)

    Vogt, B.M.; Sorensen, J.H.

    1994-09-01

    The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

  12. Resources for global risk assessment: The International Toxicity Estimates for Risk (ITER) and Risk Information Exchange (RiskIE) databases

    SciTech Connect (OSTI)

    Wullenweber, Andrea Kroner, Oliver; Kohrman, Melissa; Maier, Andrew; Dourson, Michael; Rak, Andrew; Wexler, Philip; Tomljanovic, Chuck

    2008-11-15

    The rate of chemical synthesis and use has outpaced the development of risk values and the resolution of risk assessment methodology questions. In addition, available risk values derived by different organizations may vary due to scientific judgments, mission of the organization, or use of more recently published data. Further, each organization derives values for a unique chemical list so it can be challenging to locate data on a given chemical. Two Internet resources are available to address these issues. First, the International Toxicity Estimates for Risk (ITER) database ( (www.tera.org/iter)) provides chronic human health risk assessment data from a variety of organizations worldwide in a side-by-side format, explains differences in risk values derived by different organizations, and links directly to each organization's website for more detailed information. It is also the only database that includes risk information from independent parties whose risk values have undergone independent peer review. Second, the Risk Information Exchange (RiskIE) is a database of in progress chemical risk assessment work, and includes non-chemical information related to human health risk assessment, such as training modules, white papers and risk documents. RiskIE is available at (http://www.allianceforrisk.org/RiskIE.htm), and will join ITER on National Library of Medicine's TOXNET ( (http://toxnet.nlm.nih.gov/)). Together, ITER and RiskIE provide risk assessors essential tools for easily identifying and comparing available risk data, for sharing in progress assessments, and for enhancing interaction among risk assessment groups to decrease duplication of effort and to harmonize risk assessment procedures across organizations.

  13. Portsmouth Decommissioning and Decontamination Project Director's Final

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Findings and Order | Department of Energy Decommissioning and Decontamination Project Director's Final Findings and Order Portsmouth Decommissioning and Decontamination Project Director's Final Findings and Order Portsmouth Decommissioning and Decontamination (D&D) Project Director's Final Findings and Order defines the steps for identifying a range of technical alternatives for the D&D and waste disposition components of the project, and reaching formal decisions on how best to

  14. Final Workshop of Department's Inaugural Technology Assessment |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Final Workshop of Department's Inaugural Technology Assessment Final Workshop of Department's Inaugural Technology Assessment July 12, 2011 - 12:01pm Addthis Ginny Simmons Ginny Simmons Former Managing Editor for Energy.gov, Office of Public Affairs This Wednesday, Under Secretary Steven Koonin will host the sixth and final workshop of the Department's inaugural Quadrennial Technology Review. The aim of the comprehensive assessment is to strengthen and streamline how the

  15. Hawaii Clean Energy Final PEIS Summary

    Office of Environmental Management (EM)

    HAWAI'I CLEAN ENERGY FINAL PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT SUMMARY U.S. DEPARTMENT OF ENERGY Office of Electricity Delivery and Energy Reliability Office of Energy Efficiency and Renewable Energy (DOE/EIS-0459) SEPTEMBER 2015 COVER SHEET TITLE: Hawai i Clean Energy Final Programmatic Environmental Impact Statement (Final PEIS) RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE), Offices of Electricity Delivery and Energy Reliability (OE) and Energy Efficiency and Renewable

  16. NGNP Risk Management Database: A Model for Managing Risk

    SciTech Connect (OSTI)

    John Collins; John M. Beck

    2011-11-01

    The Next Generation Nuclear Plant (NGNP) Risk Management System (RMS) is a database used to maintain the project risk register. The RMS also maps risk reduction activities to specific identified risks. Further functionality of the RMS includes mapping reactor suppliers Design Data Needs (DDNs) to risk reduction tasks and mapping Phenomena Identification Ranking Table (PIRTs) to associated risks. This document outlines the basic instructions on how to use the RMS. This document constitutes Revision 1 of the NGNP Risk Management Database: A Model for Managing Risk. It incorporates the latest enhancements to the RMS. The enhancements include six new custom views of risk data - Impact/Consequence, Tasks by Project Phase, Tasks by Status, Tasks by Project Phase/Status, Tasks by Impact/WBS, and Tasks by Phase/Impact/WBS.

  17. Sitewide risk perspectives for the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Olinger, S.J.; Foppe, T.L.

    1998-05-01

    The US Department of Energy (DOE) has recently finalized a closure plan (originally called the Ten Year Plan) for closure and environmental cleanup of previous nuclear weapons facilities. The DOE Rocky Flats Field Office has established priorities for risk reduction work to Support closure activities, as well as addressing those hazards associated with storage and management of radioactive materials and hazardous chemicals. To provide information for future National Environmental Policy Act (NEPA) or other regulatory assessments of specific risk reduction projects identified in the Closure Plan, a risk assessment of normal operations and potential accidents was recently prepared to provide an updated baseline of the cumulative impacts to the worker, public and environment due to the Site`s operations, activities, and environmental conditions in light of the Site`s change in mission, and of future closure projects. This paper summarizes the risk assessment approach, results, and conclusions.

  18. Health risks in perspective: Judging health risks of energy technologies

    SciTech Connect (OSTI)

    Rowe, M.D.

    1992-09-18

    Almost daily, Americans receive reports from the mass news media about some new and frightening risk to health and welfare. Most such reports emphasize the newsworthiness of the risks -- the possibility of a crisis, disagreements among experts, how things happened, who is responsible for fixing them, how much will it cost, conflict among parties involved, etc. As a rule, the magnitudes of the risks, or the difficulty of estimating those magnitudes, have limited newsworthiness, and so they are not mentioned. Because of this emphasis in the news media, most people outside the risk assessment community must judge the relative significance of the various risks to which we all are exposed with only that information deemed newsworthy by reporters. This information is biased and shows risks in isolation. There is no basis for understanding and comparing the relative importance of risks among themselves, or for comparing one risk, perhaps a new or newly-discovered one, in the field of all risks. The purpose of this report is to provide perspective on the various risks to which we are routinely exposed. It serves as a basis for understanding the meaning of quantitative risk estimates and for comparing new or newly-discovered risks with other, better-understood risks. Specific emphasis is placed on health risks of energy technologies.

  19. Risk Assessment/Management Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    RAMTool performs the following: • A tool to perform facility and programmatic risk assessments, produce risk registers, develop risk management plans (RMPs), link risks to improvement/risk-reduction projects, and actively manage risks • Ability to conduct risk assessments. Ease of determination of probability and consequence based on industry standard risk matrices. Complies with site risk management performance document. Provides multiple outputs/report for required risk forms. Conduct quick risk data analysis. • Performs/calculates a facility risk factormore » (RF) and a programmatic RF. Supports project and initiative prioritization and funding in order to make solid decisions on risk reduction. Assigns responsibility and accountability at a risk owner (RO) level. Monitors and tracks progress toward completing mitigation strategies. Ability to import massive amounts of data at the push of a button. Integrates development of a Risk Management Plan (RMP) Built for ease-of-use – design, built, and used by technical/management personnel. Can be customized (functions and/or reports) for further analysis« less

  20. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-16

    This Guide provides a framework for identifying and managing key technical, schedule, and cost risks through applying the requirements of DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE G 413.3-7A, dated 1-12-11. Does not cancel other directives.

  1. Final Conservation Billing Credit Policy Supplement Background...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Customers subject to I-937 must acquire conservation independent of BPA's conservation acquisition efforts. In 2007, as BPA was finalizing its Regional Dialogue Policy, several...

  2. Final Technical Report on Radioxenon Event Analysis

    SciTech Connect (OSTI)

    Ely, James H.; Cooper, Matthew W.; Hayes, James C.; Heimbigner, Tom R.; McIntyre, Justin I.; Schrom, Brian T.

    2013-03-15

    This is a final deliverable report for the Advanced Spectral Analysis for Radioxenon project with a focus on radioxenon event categorization.

  3. Final Report - Hydrogen Delivery Infrastructure Options Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report - Hydrogen Delivery Infrastructure Options Analysis Final Report - Hydrogen Delivery Infrastructure Options Analysis This report, by the Nexant team, documents an in-depth...

  4. Clark Public Utilities Impact Evaluation Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Clark Public Utilities Impact Evaluation Final Report - July 2015 - Home Energy Reports Memorandum 1375 Walnut Street Suite 200 Boulder, CO 80302 303-728-2500 To: Lauren Gage...

  5. EA-1535: Final Programmatic Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Assessment EA-1535: Final Programmatic Environmental Assessment Uranium Leasing Program Office of Legacy Management (LM) is evaluating its Uranium Leasing...

  6. EIS-0083: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Final Northeast Regional Environmental Impact Statement; The Potential Conversion of Forty-Two Powerplants From Oil to Coal or Alternate Fuels

  7. Paducah Gaseous Diffusion Plant Final Environmental Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Point of contact for more information: Robert Smith, Department of Energy-Paducah PDF icon Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and ...

  8. Community Power Works Final Report and Conclusions

    SciTech Connect (OSTI)

    Baumel, Christie

    2015-03-09

    This is the final technical report for the City of Seattle's Community Power Works program, funded through the US DOE Better Buildings grant program.

  9. EA-1212-SA-01: Final Supplement Analysis

    Broader source: Energy.gov [DOE]

    Final Supplement Analysis for the Environmental Assessment for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory

  10. Bureau of Land Management - Final Programmatic Environmental...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Report: Bureau of Land Management - Final Programmatic Environmental Impact Statement for Geothermal Leasing in the...

  11. EIS-0102: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    83 Wholesale Power Rate EIS-0102: Final Environmental Impact Statement More Documents & Publications EIS-0071: Final Environmental Impact Statement EIS-0202: Final Environmental...

  12. EA-1728: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1728: Final Environmental Assessment Final Environmental Assessment for Integrated Vegetation Management of the Hanford Site, Richland, WA This EA...

  13. EIS-0312: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0312: Final Environmental Impact Statement Fish and Wildlife Implementation Plan In this final environmental impact statement (FEIS), with...

  14. Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program Final Guidance for EPAct 2005 Section 242 Hydroelectric Incentive Program This document contains the Final ...

  15. Attachment C - Summary GHG Emissions Data FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Summary GHG Emissions Data FINAL Attachment C - Summary GHG Emissions Data FINAL File Attachment C - Summary GHG Emissions Data FINAL More Documents & Publications Attachment C

  16. Attachment C Summary GHG Emissions Data FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary GHG Emissions Data FINAL Attachment C Summary GHG Emissions Data FINAL File Attachment-C-Summary-GHG-Emissions-Data-FINAL.xlsx More Documents & Publications Attachment C -

  17. EIS-0511: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    1: Final Environmental Impact Statement EIS-0511: Final Environmental Impact Statement Aguirre Offshore GasPort Project, Puerto Rico FERC issued a Final EIS with 10 cooperating...

  18. Evaluation of the Better Buildings Neighborhood Program, Final...

    Office of Environmental Management (EM)

    Better Buildings Neighborhood Program, Final Synthesis Report, Volume 1 Evaluation of the Better Buildings Neighborhood Program, Final Synthesis Report, Volume 1 Final Report:...

  19. Final Technical Report (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Final Technical Report Citation Details In-Document Search Title: Final Technical Report This final technical report describes results and findings from a...

  20. EA-1984: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1984: Final Environmental Assessment Disposition of Five Signature Properties at Idaho National Laboratory This Final EA evaluates the impacts of...

  1. EIS-0503: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0503: Final Environmental Impact Statement New England Clean Power Link, Vermont DOE prepared this Final EIS to evaluate the potential...

  2. Final report on SNAC 11

    SciTech Connect (OSTI)

    Huber, Patrick

    2013-06-26

    This report details how the $5,000 DOE grant to support the workshop titled “Sterile Neutrinos at the Crossroads” (or SNAC11) was allocated and spent. The SNAC11 workshop covered three days during which there were 28 talks, multiple discussion sessions, a poster session with 9 posters delivered, and an impromptu public lecture on the OPERA superluminal neutrino result by the former project manager of OPERA (this was the first official OPERA talk on the subject in North America). The workshop scientific agenda can be viewed at http://www.cpe.vt.edu/snac/program.html. Emerging out of the workshop discussions, was the idea to write a comprehensive white paper describing the current state of the light sterile neutrino. This effort soon became an international collaboration. The final document, titled “Light Sterile Neutrinos: A White Paper” has nearly 200 authors, is 267 pages long, and cites 730 unique references. It has been posted the preprint archive as arXiv:1204.5379 [hep-ph]. Workshop local organizing committee co-chairs, Patrick Huber and Jonathan Link, are the white paper’s head editors. The white paper’s sections and section editors are as follows: 1. Theory and Motivation (Gabriela Barenboim, Valencia and Werner Rodejohann, MPI Heidelberg) 2. Astrophysical Evidence (Kev Abazajian, UC Irvine and Yvonne Wong, Aachen) 3. Evidence from Oscillation Experiments (Joachim Kopp, FNAL and Bill Louis, LANL) 4. Global Picture (Thierry Lasserre, CEA Saclay and Thomas Schwetz, MPI Heidelberg) 5. Requirements for Future Measurements (Bonnie Fleming, Yale and Joe Formaggio, MIT) 6. Appendix: Possible Future Experiments (Patrick Huber, Virginia Tech and Jon Link, Virginia Tech) In all 56 people participated in the workshop, of these 11 were young scientists. The workshop was covered in a feature article in Science (Science, 334, (2011), 304-306.). The DOE award was spent, as budgeted, as contractual services to VT CPE, which is the unit within the University which organizes conferences. Specifically, the travel cost of the speakers P. Langacker, K. Schreckenbach and P. Vogel was covered as well as bus transportation to KURF and to/from the airport.

  3. Final Report Package_Winnebago

    SciTech Connect (OSTI)

    Carolyn Stewart, Director, Red Mountain Energy Partners

    2006-10-31

    The Winnebago Tribe of Nebraska energy options study results will be used to advance the Tribe’s near term energy management objectives. The array of energy options identified allows the Tribe to select those activities that best fit its energy strategies, goals and objectives. During the course of the study, Red Mountain analyzed both energy options and energy organizational alternatives suitable for the Tribe, presented findings to the Tribal Council, and made recommendations regarding each. Work products delivered to the Tribe, and provided in the Final Report included: • A matrix of energy management options applicable to the Tribe, which provided descriptions of particular conservation, efficiency, weatherization, and demand management alternatives. The matrix also provided insight about relative costs of the alternatives, cost/benefit efficacy, ease of implementation, resources for implementing, and observations about each. • A matrix of utility service options applicable to the Tribe, describing each of the four alternatives described above. The matrix also provided insight about key benefits of each option, required resources, costs and timeframe for implementation, funding sources and analysis, and key issues for consideration. • Discussion guides prepared for each meeting between the Energy Committee and Council, and the Tribe’s contractor, Red Mountain Energy Partners, which included preliminary analysis and findings. • A Position Description for the Energy Manager position, which was reviewed by the Tribal HR Department, and used by the Tribe to develop a position posting. • A Utility Code designed for Winnebago to use in establishing its Utility Board, and, ultimately, to provide guidance for the Board’s further development. • A project summary book developed to include all key information, deliverables and utility provider data for the project. Winnebago’s growth trends and expansion plans require the Tribe to play a more active role in assuring that safe, reliable, affordable, and clean energy is available to meet the Reservation’s present and future needs. In considering alternatives to meet these needs, the Tribe intends to maintain alignment between its growth goals, and cultural values of sustainable, environmental stewardship.

  4. Electric chiller handbook. Final report

    SciTech Connect (OSTI)

    1998-02-01

    Electric chillers have dominated the market for large commercial cooling systems due to their history of reliable, economical operation. The phaseout of CFCs and deregulation of the utility industry are two factors that significantly impact the chiller market. The CFC phaseout is resulting in the upgrading or replacement of thousands of electric chillers nationwide. In a deregulated environment, utilities are finding increasing need to provide services that can win and retain new customers. Utility representatives need current information on applying and selecting cost-effective chiller systems. The objective of this report was to develop a comprehensive handbook that helps utility technical and marketing staff, their customers, and design professionals evaluate and select the best options for chilled-water systems in commercial buildings. Investigators used a variety of industry data sources to develop market-share information for electric and gas chiller systems and to determine applications according to building age, type, and region. Discussions with chiller manufacturers provided information on product availability, performance, and ownership cost. Using EPRI`s COMTECH software, investigators performed comprehensive cost analyses for placement of large and small chillers in three representative cities. Case studies of actual installations support these analyses. Electric Chiller Handbook provides a single source of current information on all major issues associated with chiller selection and application. Key issues include chiller availability and markets, rated performance, future viability of various refrigerant options, the cost-effectiveness of alternative chillers, and chilled-water system optimization. The Handbook also describes available hardware, outlines the features and costs of gas-fired competitive systems, and provides methods and comparisons of life-cycle costing of various chiller system options. Analyses of chiller features and economics show that electric chillers are preferable to gas chillers in the large majority of applications, consistent with current market trends. Furthermore, today`s chillers offer a wide range of efficiencies and refrigerant options to serve cooling system needs for the 20-year lifetime of the chiller. Finally, new higher-efficiency models of electric chillers offer very attractive paybacks.

  5. Santa Barbara Final Technical Report

    SciTech Connect (OSTI)

    Hacker, Angela; Hansen, Sherman; Watkins, Ashley

    2013-11-30

    This report serves as the Final Report for Santa Barbara County’s Energy Efficiency and Conservation Block Grant (EECBG) BetterBuildings Neighborhood Program (BBNP) award from the U.S. Department of Energy (DOE). This report explains how DOE BBNP funding was invested to develop robust program infrastructure designed to help property owners complete energy improvements, thereby generating substantial outcomes for the local environment and economy. It provides an overview of program development and design within the grant period, program accomplishments and challenges to date, and a plan for the future sustainability of emPower, the County’s innovative clean energy and building efficiency program. During the grant period, Santa Barbara County’s emPower program primarily targeted 32,000 owner occupied, single family, detached residential homes over 25 years old within the County. In order to help these homeowners and their contractors overcome market barriers to completing residential energy improvements, the program developed and promoted six voluntary, market-based service areas: 1) low cost residential financing (loan loss reserve with two local credit unions), 2) residential rebates, 3) local customer service, 4) expert energy advising, 5) workforce development and training, and 6) marketing, education and outreach. The main goals of the program were to lower building energy use, create jobs and develop a lasting regional building performance market. These services have generated important early outcomes and lessons after the program’s first two years in service. The DOE BBNP funding was extended through October 2014 to enable Santa Barbara County to generate continued outcomes. In fact, funding related to residential financing remains wholly available for the foreseeable future to continue offering Home Upgrade Loans to approximately 1,300 homeowners. The County’s investment of DOE BBNP funding was used to build a lasting, effective, and innovative program design that has earned statewide recognition and distinction. As a result of the County’s leadership, the California Energy Commission (CEC) and the California Public Utilities Commission (PUC) offered over $5 million in funding to continue realizing ongoing returns on the initial investment made in developing emPower, alongside remaining (extended) DOE BBNP funds. These new funding sources, accepted by the County Board of Supervisors on June 25, 2013, also allow the program to expand its innovative energy solutions to the broader region, including Ventura and San Luis Obispo Counties.

  6. FINAL CLOSE-OUT REPORT

    SciTech Connect (OSTI)

    Mark A. Carl

    2004-08-03

    The Interstate Oil and Gas Compact Commission (IOGCC) engaged in numerous projects outlined under the scope of work discussed in the United States Department of Energy (DOE) grant number DE-FG26-01BC15336 awarded to the IOGCC. Numerous projects were completed that were extremely valuable to state oil and gas agencies as a result of work performed utilizing resources provided by the grant. There are numerous areas in which state agencies still need assistance. This additional assistance will need to be addressed under another grant because funding resources have been exhausted under The scope of work objectives for the eight projects covered under this grant is as follows: (1) Improve uniformity within state oil and gas data management efforts. (2) Conduct environmental compliance workshops and related educational projects on natural gas and oil exploration and production. (3) Improve regulatory efficiency through partnering opportunities provided by the Appalachian Illinois Basin Directors. (4) Promote the development and implementation of risk-based environmental regulation at the state level through an expertise-sharing program that brings stakeholders together to develop guidelines and models to meet regulatory challenges. (5) Support the IOGCC's regulatory streamlining efforts, including the identification and elimination of unnecessary duplications of effort between state and federal programs dealing with exploration and production on public lands, and identify the need to enhance and regionalize regulatory coordination and cooperation among the states. (6) Involve states and provinces of Canada that have offshore petroleum exploration and production in a regulatory sharing alliance to identify areas of concern that may be incorporated into standard practices for offshore environmental and regulatory compliance. (7) Coordinate efforts with the U.S. Environmental Protection Agency (EPA) to ensure that adequate information is available to the public regarding oil and gas exploration and production operations consistent with the intent of ''community right-to-know'' programs. (8) Demonstrate leadership in educating the public about the exploration, extraction and refining of petroleum; the economic value of domestic petroleum and its byproducts; conservation measures and their benefits; and other topics designed to assist the American public in gaining understanding of the importance of domestic resources and defining a true picture of those resources.

  7. Microsoft Word - CCE_Final_Rule_02-07-11 _Final Word_.docx | Department of

    Office of Environmental Management (EM)

    Energy CCE_Final_Rule_02-07-11 _Final Word_.docx Microsoft Word - CCE_Final_Rule_02-07-11 _Final Word_.docx Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment PDF icon Microsoft Word - CCE_Final_Rule_02-07-11 _Final Word_.docx More Documents & Publications Federal Register Vol. 76 No. 44, 12422-12505 - Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and

  8. (Ines_Triay)_Final_Testimony.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    nuclear energy research. Environmental Management Program Strategies: A National Responsibility We reduce risks and protect our workers, our communities, and the...

  9. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    SciTech Connect (OSTI)

    Jones, M.E.; Shain, D.I.

    1994-12-31

    The Rocky Flats Plant is developing, with active stakeholder participation, a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative risk analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or end states. These postulated options or end states can be various remedial alternatives, or future endstate uses of federal land.

  10. Innovative Manufacturing Initiative Recognition Day - Final Participant

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Listing | Department of Energy Day - Final Participant Listing Innovative Manufacturing Initiative Recognition Day - Final Participant Listing PDF icon imi_recogitionday_participants.pdf More Documents & Publications Innovative Manufacturing Initiative Recognition Day 2015 AMO Peer Review Agenda CX-100154 Categorical Exclusion Determination

  11. Microsoft Word - Airport_EA_Final.doc

    National Nuclear Security Administration (NNSA)

    515 Final Environmental Assessment for Proposed Closure of the Airport Landfills Within Technical Area 73 at Los Alamos National Laboratory, Los Alamos, New Mexico May 22, 2005 Department of Energy National Nuclear Security Administration Los Alamos Site Office Final EA for Proposed Closure of the Airport Landfills within TA-73 at LANL Page iii of viii Contents Acronyms and Terms .................................................................................................................. vi

  12. FY 2014 Excess Elimination Report FINAL | Department of Energy

    Energy Savers [EERE]

    Excess Elimination Report FINAL FY 2014 Excess Elimination Report FINAL PDF icon FY 2014 Excess Elimination Report FINAL.PDF More Documents & Publications FY 2013 Excess Elimination Report UCOR Contract & Fee Determination EA-1451: Final Environmental Assessment

  13. CSS Letter - Final.tif | Department of Energy

    Energy Savers [EERE]

    CSS Letter - Final.tif CSS Letter - Final.tif PDF icon CSS Letter - Final.tif More Documents & Publications CSS Letter - Final.tif NAHB_RequestandResponse.pdf

  14. 2009 ECR FINAL REPORT 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 PDF icon 2009 ECR Report More Documents & Publications test Final ECR 2008 Report Environmental...

  15. Security Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  16. Probabilistic Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear

  17. Quantitative Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear

  18. Basic theory and methods of dosimetry for use in risk assessment of genotoxic chemicals. Final report

    SciTech Connect (OSTI)

    Ehrenberg, L.; Granath, F.

    1992-12-31

    This project is designed to be theoretical, with limited experimental input. The work then would have to be directed towards an identification of problems, with an emphasis on the potential ability of molecular/biochemical methods to reach a solution, rather than aiming at solutions of the problems. In addition, the work is dependent on experimental work within parallel projects. Initially, projects running at this laboratory were strongly tied up with practical matters, such as the development of monitoring methods for specific exposures, with limited resources for basic research. As sketched in the scientific report below, section 4 the meaningfulness of molecular/biochemical methods and their potential contribution to the problem of dsk estimation has to be seen against a broad overview of this problem and current efforts to solve it. This overview, given as a brief summary in section 3, shows the necessity of combining different fields of research, holding them together by strictly quantitative aspects.

  19. EIS-0015: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    15: Final Environmental Impact Statement EIS-0015: Final Environmental Impact Statement U.S. Spent Fuel Policy PDF icon EIS-0015: Final Environmental Impact Statement, volume 1 PDF icon EIS-0015: Final Environmental Impact Statement, volume 2 PDF icon EIS-0015: Final Environmental Impact Statement, volume 3 PDF icon EIS-0015: Final Environmental Impact Statement, volume 4 PDF icon EIS-0015: Final Environmental Impact Statement, volume 5 More Documents & Publications EIS-0093: Final

  20. Improving the safety of LWR power plants. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-04-01

    This report documents the results of the Study to identify current, potential research issues and efforts for improving the safety of Light Water Reactor (LWR) power plants. This final report describes the work accomplished, the results obtained, the problem areas, and the recommended solutions. Specifically, for each of the issues identified in this report for improving the safety of LWR power plants, a description is provided in detail of the safety significance, the current status (including information sources, status of technical knowledge, problem solution and current activities), and the suggestions for further research and development. Further, the issues are ranked for action into high, medium, and low priority with respect to primarily (a) improved safety (e.g. potential reduction in public risk and occupational exposure), and secondly (b) reduction in safety-related costs (improving or maintaining level of safety with simpler systems or in a more cost-effective manner).

  1. Rebaselining seismic risks for resumption of Building 707 plutonium operations at the Rocky Flats Plant

    SciTech Connect (OSTI)

    Elia, F. Jr.; Foppe, T.; Stahlnecker, E.

    1993-08-01

    Natural phenomena risks have been assessed for plutonium handling facilities at the Rocky Flats Plant, based on numerous studies performed for the Department of Energy Natural Phenomena Hazards Project. The risk assessment was originally utilized in the facilities Final Safety Analysis Reports and in subsequent risk management decisions. Plutonium production operations were curtailed in 1989 in order for a new operating contractor to implement safety improvements. Since natural phenomena events dominated risks to the public, a re-assessment of these events were undertaken for resumption of plutonium operations.

  2. Supervisory Loan Specialist (Strategic Risk)

    Broader source: Energy.gov [DOE]

    This position is located in the Department of Energy (DOE) Loans Programs Office (LPO), Risk Management Division (RMD or LP-40) Strategic Risk Group (LP-40). The incumbent is the supervisor for the...

  3. Risk communication in environmental assessment

    SciTech Connect (OSTI)

    Rahm-Crites, L.

    1996-08-26

    Since the enactment of NEPA and other environmental legislation, the concept of `risk communication` has expanded from simply providing citizens with scientific information about risk to exploring ways of making risk information genuinely meaningful to the public and facilitating public involvement in the very processes whereby risk is analyzed and managed. Contemporary risk communication efforts attempt to find more effective ways of conveying increasingly complex risk information and to develop more democratic and proactive approaches to community involvement, in particular to ensuring the participation of diverse populations in risk decisions. Although considerable progress has been made in a relatively short time, risk communication researchers and practitioners currently face a number of challenges in a time of high expectations, low trust, and low budgets.

  4. EIS-0032: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    32: Final Environmental Impact Statement EIS-0032: Final Environmental Impact Statement 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company PDF icon EIS-0032: Final Environmental Impact Statement More Documents & Publications EIS-0097: Final Environmental Impact Statement EIS-0067: Final Environmental Impact Statement EIS-0129: Final Environmental Impact Statement

  5. EIS-0060: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Impact Statement EIS-0060: Final Environmental Impact Statement Bonneville Power Administration Proposed FY 1981 Program PDF icon EIS-0060: Final Environmental Impact Statement More Documents & Publications EIS-0005: Final Environmental Impact Statement EIS-0097: Final Environmental Impact Statement EIS-0048-S: Final Supplemental Environmental Impact Statement to FES-75-79

  6. Budget Risk & Prioritization Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    BRPAtool performs the following: ?Assists managers in making solid decisions on what scope/activities to reduce and/or eliminate, to meet constrained budgets, based on multiple risk factors ?Enables analysis of different budget scenarios ?Can analyze risks and cost for each activity based on technical, quantifiable risk criteria and management-determined risks ?Real-time analysis ?Enables managers to determine the multipliers and where funding is best applied ?Promotes solid budget defense

  7. Regulatory cost-risk study

    SciTech Connect (OSTI)

    Not Available

    1983-04-01

    This study is intended to provide some quantitative perspective by selecting certain examples of criteria for which estimates of risks and costs can be obtained, and the balance of the various risks, (i.e., internal versus external risks), can be put into perspective. 35 refs., 39 tabs. (JDB)

  8. Risk perception in developing countries

    SciTech Connect (OSTI)

    Wilbanks, T.J.; Rayner, S.F.

    1985-02-15

    The paper briefly reviews: (1) what risk perception means to most people in developing countries; (2) some of the modern-technology-related risks to which people in these countries are exposed; and (3) some research evidence about risk perception that gives hints about how such perceptions will evolve in developing countries. (ACR)

  9. NGNP Risk Management Database: A Model for Managing Risk

    SciTech Connect (OSTI)

    John Collins

    2009-09-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoft® Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  10. Multi-agency radiation survey and site investigation manual (MARSIM). Final report

    SciTech Connect (OSTI)

    1997-12-01

    The MARSSIM provides information on planning, conducting, evaluating, and documenting building surface and surface soil final status radiological surveys for demonstrating compliance with dose or risk-based regulations or standards. The MARSSIM is a multi-agency consensus document that was developed collaboratively by four Federal agencies having authority and control over radioactive materials: Department of Defense (DOD), Department of Energy (DOE), Environmental Protection Agency (EPA), and Nuclear Regulatory Commission (NRC). The MARSSIM`s objective is to describe a consistent approach for planning, performing, and assessing building surface and surface soil final status surveys to meet established dose or risk-based release criteria, while at the same time encouraging an effective use of resources.

  11. Photovoltaic Degradation Risk: Preprint

    SciTech Connect (OSTI)

    Jordan, D. C.; Kurtz, S. R.

    2012-04-01

    The ability to accurately predict power delivery over the course of time is of vital importance to the growth of the photovoltaic (PV) industry. Important cost drivers include the efficiency with which sunlight is converted into power, how this relationship changes over time, and the uncertainty in this prediction. An accurate quantification of power decline over time, also known as degradation rate, is essential to all stakeholders - utility companies, integrators, investors, and researchers alike. In this paper we use a statistical approach based on historical data to quantify degradation rates, discern trends and quantify risks related to measurement uncertainties, number of measurements and methodologies.

  12. Risk Management Tool Attributes: | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Risk Management Tool Attributes: Risk Management Tool Attributes: PDF icon Risk Management Tool Attributes: More Documents & Publications Heating Ventilation and Air Conditioning...

  13. Norcal Prototype LNG Truck Fleet: Final Results

    SciTech Connect (OSTI)

    Not Available

    2004-07-01

    U.S. DOE and National Renewable Energy Laboratory evaluated Norcal Waste Systems liquefied natural gas (LNG) waste transfer trucks. Trucks had prototype Cummins Westport ISXG engines. Report gives final evaluation results.

  14. Research in High Energy Physics. Final report

    SciTech Connect (OSTI)

    Conway, John S.

    2013-08-09

    This final report details the work done from January 2010 until April 2013 in the area of experimental and theoretical high energy particle physics and cosmology at the University of California, Davis.

  15. Technical Assessment Team Issues Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2015 Technical Assessment Team Issues Final Report This week the Department of Energy's Technical Assessment Team (TAT) visited Carlsbad and met with federal and contractor staff at WIPP and the Mayor's Nuclear Task Force to provide a briefing and answer questions on their final report that was released on March 26 th . The TAT, which was established shortly after the February 14, 2014 radiological release that occurred in the WIPP underground, was led by the Savannah River National Laboratory

  16. Final Technical Report: Collaborative Research. Polymeric Muliferroics

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect SciTech Connect Search Results Technical Report: Final Technical Report: Collaborative Research. Polymeric Muliferroics Citation Details In-Document Search Title: Final Technical Report: Collaborative Research. Polymeric Muliferroics The goal of this project is to investigate room temperature magnetism and magnetoelectric coupling of polymeric multiferroics. A new family of organic charge-transfer complexes has been emerged as a fascinating opportunity

  17. Microsoft Word - Norwich Final EA.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    36 FINAL ENVIRONMENTAL ASSESSMENT FOR THE NORWICH COGENERATION INITIATIVE, NORWICH, CONNECTICUT U.S. Department of Energy National Energy Technology Laboratory Morgantown, West Virginia March 2011 DOE/EA-1836 FINAL ENVIRONMENTAL ASSESSMENT FOR THE NORWICH COGENERATION INITIATIVE, NORWICH, CONNECTICUT U.S. Department of Energy National Energy Technology Laboratory Morgantown, West Virginia March 2011 DOE/EA-1836 iii March 2011 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE or the

  18. Final Information Quality Bulletin for Peer Review

    Office of Environmental Management (EM)

    04 OFFICE OF MANAGEMENT AND BUDGET Final Information Quality Bulletin for Peer Review INTRODUCTION This Bulletin establishes that important scientific information shall be peer reviewed by qualified specialists before it is disseminated by the federal government. We published a proposed Bulletin on September 15, 2003. Based on public comments, we published a revised proposal for additional comment on April 28, 2004. We are now finalizing the April version, with minor revisions responsive to the

  19. Microsoft Word - ROD.FinalEdit.doc

    National Nuclear Security Administration (NNSA)

    RECORD OF DECISION FINAL ENVIRONMENTAL IMPACT STATEMENT LAS VEGAS VALLEY DISPOSAL BOUNDARY FES-04-48 I. Introduction This document constitutes the Record of Decision (ROD) of the Department of Interior, Bureau of Land Management (BLM), Las Vegas Field Office, Nevada, regarding the preferred alternative for the Las Vegas Valley Disposal Boundary Final Environmental Impact Statement (FEIS). The Las Vegas Field Office plans to dispose of BLM managed land in the Las Vegas Valley, consistent with the

  20. Risk Analysis Virtual ENvironment

    Energy Science and Technology Software Center (OSTI)

    2014-02-10

    RAVEN has 3 major functionalities: 1. Provides a Graphical User Interface for the pre- and post-processing of the RELAP-7 input and output. 2. Provides the capability to model nuclear power plants control logic for the RELAP-7 code and dynamic control of the accident scenario evolution. This capability is based on a software structure that realizes a direct connection between the RELAP-7 solver engine (MOOSE) and a python environment where the variables describing the plant statusmore » are accessible in a scripting environment. RAVEN support the generation of the probabilistic scenario control by supplying a wide range of probability and cumulative distribution functions and their inverse functions. 3. Provides a general environment to perform probability risk analysis for RELAP-7, RELAP-5 and any generic MOOSE based applications. The probabilistic analysis is performed by sampling the input space of the coupled code parameters and it is enhanced by using modern artificial intelligence algorithms that accelerate the identification of the areas of major risk (in the input parameter space). This environment also provides a graphical visualization capability to analyze the outcomes. Among other approaches, the classical Monte Carlo and Latin Hypercube sampling algorithms are available. For the acceleration of the convergence of the sampling methodologies, Support Vector Machines, Bayesian regression, and collocation stochastic polynomials chaos are implemented. The same methodologies here described could be used to solve optimization and uncertainties propagation problems using the RAVEN framework.« less

  1. EIS-0064: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    4: Final Environmental Impact Statement EIS-0064: Final Environmental Impact Statement Rocky Flats Plant Site, Jefferson County, Golden, Colorado (see also ERDA-1545-D) PDF icon EIS-0064: Final Environmental Impact Statement, volume 1 PDF icon EIS-0064: Final Environmental Impact Statement, volume 2 PDF icon EIS-0064: Final Environmental Impact Statement, volume 3 More Documents & Publications EIS-0089: Final Environmental Impact Statement EIS-0015: Final Environmental Impact Statement

  2. EIS-0072: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    2: Final Environmental Impact Statement EIS-0072: Final Environmental Impact Statement Great Plains Gasification Project, Mercer County, North Dakota PDF icon EIS-0072: Final Environmental Impact Statement, Volume 1 PDF icon EIS-0072: Final Environmental Impact Statement, Volume 2 PDF icon EIS-0072: Final Environmental Impact Statement, Volume 3 More Documents & Publications EIS-0025: Final Environmental Impact Statement EIS-0004: Final Environmental Impact Statement EIS-0066

  3. CPR_RemedialAction_flowchart_final.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    characterize site STOP no further action needed No Yes Is development successful? 4b No Yes Is it appropriate to invest time and money in new treatment technologies? (consider risk) 4a Yes No Are treatment technologies available? 4 Yes No Are retrieval technologies available? 3 Yes No Does the waste site require action? (consider risk) 2 Has the waste site been adequately characterized? 1 Yes No Yes No Are disposal alternatives available? 5 Yes No Are retrieval, treatment and disposal

  4. Towards secure virtual directories : a risk analysis framework.

    SciTech Connect (OSTI)

    Claycomb, William R.

    2010-07-01

    Directory services are used by almost every enterprise computing environment to provide data concerning users, computers, contacts, and other objects. Virtual directories are components that provide directory services in a highly customized manner. Unfortunately, though the use of virtual directory services are widespread, an analysis of risks posed by their unique position and architecture has not been completed. We present a detailed analysis of six attacks to virtual directory services, including steps for detection and prevention. We also describe various categories of attack risks, and discuss what is necessary to launch an attack on virtual directories. Finally, we present a framework to use in analyzing risks to individual enterprise computing virtual directory instances. We show how to apply this framework to an example implementation, and discuss the benefits of doing so.

  5. IEA-Risk Quantification and Risk Management in Renewable Energy...

    Open Energy Info (EERE)

    Energy Topics: Finance, Implementation, Market analysis Resource Type: Presentation, Lessons learnedbest practices Website: www.iea-retd.orgfilesRISK%20IEA-RETD%20(2011-6)....

  6. AMERIND Risk Annual Conference and Trade Fair

    Broader source: Energy.gov [DOE]

    Hosted by the AMERIND Risk, this three-day conference includes risk management training, workers' safety, human resources, and more.

  7. Risk Management RM | Department of Energy

    Energy Savers [EERE]

    Risk Management RM Risk Management RM This tool is the process of continuous and iterative identification and control of project risks and opportunities. Risks can be technical, financial, or programmatic. The goal for the risk management system is to either avoid the risk's threat by taking preemptive action or to minimize the risks negative impacts on project performance. Project opportunities identified through the project risk management process can be handled in a similar manner with the

  8. Risk Management Process Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    » Risk Management Process Overview Risk Management Process Overview figure depicting three tier risk management process The cybersecurity risk management process explained in the Electricity Sector Cybersecurity Risk Management Process (RMP) Guideline has two primary components: the risk management model and the the risk management cycle. The risk management model reflects the organization as a three-tiered structure and provides a comprehensive view for the electricity sector organization and

  9. 60 Day Federal Register Notice Extension - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension - FINAL 60 Day Federal Register Notice Extension - FINAL PDF icon 60 Day Federal Register Notice Extension-Final.pdf More Documents & Publications 30 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Proposed - FINAL

  10. 60 Day Federal Register Notice Proposed - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed - FINAL 60 Day Federal Register Notice Proposed - FINAL PDF icon 60 Day Federal Register Notice Proposed-Final.pdf More Documents & Publications 30 Day Federal Register Notice Proposed - FINAL 60 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed

  11. 2007 Wholesale Power Rate Case Final Proposal : Market Price Forecast Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-07-01

    This study presents BPA's market price forecasts for the Final Proposal, which are based on AURORA modeling. AURORA calculates the variable cost of the marginal resource in a competitively priced energy market. In competitive market pricing, the marginal cost of production is equivalent to the market-clearing price. Market-clearing prices are important factors for informing BPA's power rates. AURORA was used as the primary tool for (a) estimating the forward price for the IOU REP Settlement benefits calculation for fiscal years (FY) 2008 and 2009, (b) estimating the uncertainty surrounding DSI payments and IOU REP Settlements benefits, (c) informing the secondary revenue forecast and (d) providing a price input used for the risk analysis. For information about the calculation of the secondary revenues, uncertainty regarding the IOU REP Settlement benefits and DSI payment uncertainty, and the risk run, see Risk Analysis Study WP-07-FS-BPA-04.

  12. Information needs for risk assessment

    SciTech Connect (OSTI)

    DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

    1990-12-31

    Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

  13. Risk Removal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Risk Removal Risk Removal Workers safely remove old mercury tanks from the Y-12 National Security Complex. Workers safely remove old mercury tanks from the Y-12 National Security Complex. Risk removal is the most crucial and pivotal action for EM to achieve its missions locally. The organization works to protect the environment and residents' and employees' health, provide clean land for future generations, and bolster DOE missions, modernization, and economic development in Oak Ridge. All of

  14. Estimated human health risks of disposing of nonhazardous oil field waste in salt caverns

    SciTech Connect (OSTI)

    Tomasko, D.; Elcock, D.; Veil, J.

    1997-09-01

    Argonne National Laboratory (ANL) has completed an evaluation of the possibility that adverse human health effects (carcinogenic and noncarcinogenic) could result from exposure to contaminants released from nonhazardous oil field wastes (NOW) disposed in domal salt caverns. In this assessment, several steps were used to evaluate potential human health risks: identifying potential contaminants of concern, determining how humans could be exposed to these contaminants, assessing the contaminants` toxicities, estimating contaminant intakes, and, finally, calculating human cancer and noncancer risks.

  15. Creating New Incentives for Risk Identification and Insurance Process for the

    Office of Scientific and Technical Information (OSTI)

    Creating New Incentives for Risk Identification and Insurance Process for the Electric Utility Industry (initial award through Award Modification 2); Energy & Risk Transfer Assessment (Award Modifications 3 - 6) Final Technical Report for DOE Award DE-FG26-04NT42250 Issued by The Center for Infrastructure Protection (formerly the Critical Infrastructure Protection Program) The Hon. Claude M. "Mick" Kicklighter Director and Principal Investigator George Mason University School of

  16. EMAB Risk Subcommittee Interim Report

    Office of Environmental Management (EM)

    ADVISORY BOARD Incorporating Risk and Sustainability into Decision Making Submitted by the ... Secondly, the Subcommittee is tasked with reviewing"incorporating sustainability into the ...

  17. ORISE: Crisis and Risk Communication

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. Department of Energy (DOE) Oak Ridge Office (ORO), ORISE provides crisis and risk communication support through the management of its Joint Information Center (JIC)...

  18. Budget Risk & Prioritization Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    BRPAtool performs the following: •Assists managers in making solid decisions on what scope/activities to reduce and/or eliminate, to meet constrained budgets, based on multiple risk factors •Enables analysis of different budget scenarios •Can analyze risks and cost for each activity based on technical, quantifiable risk criteria and management-determined risks •Real-time analysis •Enables managers to determine the multipliers and where funding is best applied •Promotes solid budget defense

  19. R00475--FM Risk Mgmt

    Energy Savers [EERE]

    to project success. The risk identification process on a project is typically one of brain- storming, and the usual rules of brainstorming apply: * The full project team should...

  20. Microsoft Word - NationalPolicyAssurancesAwardTermsFinal81804...

    Office of Environmental Management (EM)

    NationalPolicyAssurancesAwardTermsFinal81804.doc Microsoft Word - NationalPolicyAssurancesAwardTermsFinal81804.doc PDF icon Microsoft Word - NationalPolicyAssurancesAwardTermsFinal...

  1. Property:NEPA FinalEA-EISDate | Open Energy Information

    Open Energy Info (EERE)

    FinalEA-EISDate Jump to: navigation, search Property Name NEPA FinalEA-EISDate Property Type Date This is a property of type Date. Pages using the property "NEPA FinalEA-EISDate"...

  2. Microsoft Word - acqguide18pt0 March 2011 final | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    acqguide18pt0 March 2011 final Microsoft Word - acqguide18pt0 March 2011 final Microsoft Word - acqguide18pt0 March 2011 final More Documents & Publications Chapter 18 - Emergency...

  3. Agenda_2015 APM Workshop_Final | Department of Energy

    Office of Environmental Management (EM)

    Agenda2015 APM WorkshopFinal Agenda2015 APM WorkshopFinal Agenda2015 APM WorkshopFinal1.pdf More Documents & Publications Agenda 2015 DOE Acquisition and Project Management...

  4. Direct_Final_Rule_Bill.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DirectFinalRuleBill.pdf DirectFinalRuleBill.pdf PDF icon DirectFinalRuleBill.pdf More Documents & Publications DOE Retrospective Review Plan Report May 2012 Appliance...

  5. EIS-0375: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Disposal of Greater-Than-Class C Low-Level Radioactive Waste The U.S. Department of Energy (DOE) has prepared this Final Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (Final GTCC EIS) to evaluate the potential environmental impacts associated with the proposed development, operation, and long-term management of a disposal facility or facilities for GTCC low-level radioactive waste (LLRW) and DOE GTCC-like waste.

  6. UPS CNG Truck Fleet Final Report

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    ® ® ® ® ® ® ® Clean Air Natural Gas Vehicle This is a Clean Air Natural Gas Vehicle This is a UPS CNG Truck Fleet UPS CNG Truck Fleet UPS CNG Truck Fleet Final results Final Results Produced for the U.S. Department of Energy (DOE) by the National Renewable Energy Laboratory (NREL), a DOE national laboratory Alternative Fuel Trucks DOE/NREL Truck Evaluation Project By Kevin Chandler, Battelle Kevin Walkowicz, National Renewable Energy Laboratory Nigel Clark, West Virginia University

  7. EIS-0026-S: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy S: Final Supplemental Environmental Impact Statement EIS-0026-S: Final Supplemental Environmental Impact Statement Final Supplemental Environmental Impact Statement, Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico PDF icon EIS-0026-S: Final Supplemental Environmental Impact Statement, Executive Summary PDF icon EIS-0026-S: Final Supplemental Environmental Impact Statement, Volume 1 PDF icon EIS-0026-S: Final Supplemental Environmental Impact Statement, Volume 2 PDF icon

  8. EIS-0370: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0370: Final Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Final Environmental Impact Statement (Summary) PDF icon EIS-0370: Final Environmental Impact Statement (Volume 1) PDF icon EIS-0370: Final Environmental Impact Statement (Volume 2) PDF icon EIS-0370: Final Environmental Impact Statement (Volume 3) More Documents & Publications EIS-0370: Draft Environmental Impact Statement EIS-0370:

  9. 2007 Wholesale Power Rate Case Initial Proposal : Risk Analysis Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-11-01

    The Federal Columbia River Power System (FCRPS), operated on behalf of the ratepayers of the PNW by BPA and other Federal agencies, faces many uncertainties during the FY 2007-2009 rate period. Among these uncertainties, the largest revolve around hydro conditions, market prices and river operations for fish recovery. In order to provide a high probability of making its U.S. Treasury payments, BPA performs a Risk Analysis as part of its rate-making process. In this Risk Analysis, BPA identifies key risks, models their relationships, and then analyzes their impacts on net revenues (total revenues less expenses). BPA subsequently evaluates in the ToolKit Model the Treasury Payment Probability (TPP) resulting from the rates, risks, and risk mitigation measures described here and in the Wholesale Power Rate Development Study (WPRDS). If the TPP falls short of BPA's standard, additional risk mitigation revenues, such as PNRR and CRAC revenues are incorporated in the modeling in ToolKit until the TPP standard is met. Increased wholesale market price volatility and six years of drought have significantly changed the profile of risk and uncertainty facing BPA and its stakeholders. These present new challenges for BPA in its effort to keep its power rates as low as possible while fully meeting its obligations to the U.S. Treasury. As a result, the risk BPA faces in not receiving the level of secondary revenues that have been credited to power rates before receiving those funds is greater. In addition to market price volatility, BPA also faces uncertainty around the financial impacts of operations for fish programs in FY 2006 and in the FY 2007-2009 rate period. A new Biological Opinion or possible court-ordered change to river operations in FY 2006 through FY 2009 may reduce BPA's net revenues included Initial Proposal. Finally, the FY 2007-2009 risk analysis includes new operational risks as well as a more comprehensive analysis of non-operating risks. Both the operational and non-operational risks will be described in Section 2.0 of this study. Given these risks, if rates are designed using BPA's traditional approach of only adding Planned Net Revenues for Risk (PNRR), power rates would need to recover a much larger ''risk premium'' to meet BPA's TPP standard. As an alternative to high fixed risk premiums, BPA is proposing a risk mitigation package that combines PNRR with a variable rate mechanism similar to the cost recovery adjustment mechanisms used in the FY 2002-2006 rate period. The proposed risk mitigation package is less expensive on a forecasted basis because the rates can be adjusted on an annual basis to respond to uncertain financial outcomes. BPA is also proposing a Dividend Distribution Clause (DDC) to refund reserves in excess of $800M to customers in the event net revenues in the next rate period exceed current financial forecasts.

  10. Microsoft Word - ESC 10-09-08 PCDC Final Report - FINAL.doc

    Office of Environmental Management (EM)

    eMeter Corporation, 2010. All rights reserved. PowerCentsDC(tm) Program Final Report September 2010 Prepared by eMeter Strategic Consulting for the Smart Meter Pilot Program, Inc. PowerCentsDC Program Final Report i September 2010 Contents Executive Summary .............................................................................................................. 1 1 Introduction

  11. Computer Security Risk Assessment

    Energy Science and Technology Software Center (OSTI)

    1992-02-11

    LAVA/CS (LAVA for Computer Security) is an application of the Los Alamos Vulnerability Assessment (LAVA) methodology specific to computer and information security. The software serves as a generic tool for identifying vulnerabilities in computer and information security safeguards systems. Although it does not perform a full risk assessment, the results from its analysis may provide valuable insights into security problems. LAVA/CS assumes that the system is exposed to both natural and environmental hazards and tomore » deliberate malevolent actions by either insiders or outsiders. The user in the process of answering the LAVA/CS questionnaire identifies missing safeguards in 34 areas ranging from password management to personnel security and internal audit practices. Specific safeguards protecting a generic set of assets (or targets) from a generic set of threats (or adversaries) are considered. There are four generic assets: the facility, the organization''s environment; the hardware, all computer-related hardware; the software, the information in machine-readable form stored both on-line or on transportable media; and the documents and displays, the information in human-readable form stored as hard-copy materials (manuals, reports, listings in full-size or microform), film, and screen displays. Two generic threats are considered: natural and environmental hazards, storms, fires, power abnormalities, water and accidental maintenance damage; and on-site human threats, both intentional and accidental acts attributable to a perpetrator on the facility''s premises.« less

  12. EIS-0455: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0455: Final Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA The BLM's purpose and need for the GSEP is to...

  13. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho The U.S. Department of Energy...

  14. EIS-0454: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project PDF icon EIS-0454-FEIS-2011.pdf More...

  15. EIS-0343: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0343: Final Environmental Impact Statement COB Energy Facility COB Energy Facility, LLC, a subsidiary of Peoples Energy Resources Company...

  16. ATVM Interim Final Rule Correction | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    A few corrections to the final rule regarding fuel economy numbers. ATVM Interim Final Rule Correction More Documents & Publications Updated Guidance For Applicants To Advanced...

  17. Final Technical Report: Discovering the Nature of Dark Energy...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Final Technical Report: Discovering the Nature of Dark Energy: Towards Better Distances from Type Ia Supernovae Citation Details In-Document Search Title: Final...

  18. EA-1839: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment and Finding of No Significant Impact EA-1839: Final Environmental Assessment and Finding of No Significant Impact Department of Energy Loan...

  19. EA-1800: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1800: Final Environmental Assessment Monarch Warren County Wind Turbine Project The U.S. Department of Energy (DOE) has provided Federal funding...

  20. EA-1906: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1906: Final Environmental Assessment Operations, Upgrades, and Consolidation at the Western Command Site, NM This NNSA EA evaluates the potential...

  1. EA-1917: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1917: Final Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates the potential environmental impacts of a...

  2. EA-1829: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1829: Final Environmental Assessment and Finding of No Significant Impact Phycal Algae Pilot Project, Wahiawa...

  3. EA-1747: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Assessment EA-1747: Final Environmental Assessment Surface Water Configuration Project at the Rocky Flats Site, Colorado The RFS is owned by the United...

  4. EA-1960: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western...

  5. EA-1826: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1826: Final Environmental Assessment AV Solar Ranch One Project, Los Angeles and Kern Counties, California The U.S. Department of Energy (DOE) is...

  6. EA-1866: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Assessment and Finding of No Significant Impact EA-1866: Final Environmental Assessment and Finding of No Significant Impact Argonne National Laboratory...

  7. EA-1889: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1889: Final Environmental Assessment and Finding of No Significant Impact Disposal of Decommissioned,...

  8. EA-1869: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Environmental Assessment and Finding of No Significant Impact EA-1869: Final Environmental Assessment and Finding of No Significant Impact General Motors LLC, Electric...

  9. EA-1905: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Assessment EA-1905: Final Environmental Assessment Department of Energy Funding For Double Eagle Water System, Carlsbad, New Mexico (November 2011) For more...

  10. EA-1775: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1775: Final Environmental Assessment Texas A&M University Combined Heat and Power Project, College Station, Texas DOE prepared this Environmental...

  11. EA-1769: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment and Finding of No Significant Impact EA-1769: Final Environmental Assessment and Finding of No Significant Impact Houston Advanced Research...

  12. EA-1602: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Final Environmental Assessment EA-1602: Final Environmental Assessment Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water...

  13. EA-1884: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1884: Final Environmental Assessment Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO DOE's Western Area...

  14. EA-1870: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1870: Final Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The U.S. Department of Energy (DOE) prepared this...

  15. EIS-0333: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm This Draft Environmental Impact Statement...

  16. EA-1699: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    99: Final Environmental Assessment EA-1699: Final Environmental Assessment PopeDouglas Third Combustor Expansion Project, Alexandria, Minnesota The United States Department of...

  17. EIS-0095: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0095: Final Environmental Impact Statement Bonneville Power Administration's Expanded Residential Weatherization Program The U.S....

  18. Roadmap Finalized for Low-Temperature, Coproduced, and Geopressured...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roadmap Finalized for Low-Temperature, Coproduced, and Geopressured Technologies Roadmap Finalized for Low-Temperature, Coproduced, and Geopressured Technologies March 23, 2011 -...

  19. EIS-0449: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0449: Final Environmental Impact Statement Blythe Solar Power Project This Plan AmendmentFinal Environmental Impact Statement (PAFEIS) addresses the possible...

  20. EIS-0486: DOE Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0486: DOE Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE announces the availability of a final EIS that ...

  1. EIS-0499: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0499: EPA Notice of Availability of Final Environmental Impact Statement Great Northern Transmission Line Project, Minnesota EPA announced the availability of the Final ...

  2. EIS-0486: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0486: EPA Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project EPA announces the availability of a final EIS that ...

  3. Energy Department Announces Winner of Final Phase of Smart Grid...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Winner of Final Phase of Smart Grid Data Access Funding Opportunity Energy Department Announces Winner of Final Phase of Smart Grid Data Access Funding Opportunity December 19, 2013 - ...

  4. EIS-0413: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan PDF icon EIS-0413: Final Environmental Impact Statement - Appendix B-4 - Bat and Bird Conservation Strategy PDF icon EIS-0413: Final Environmental Impact Statement -...

  5. EIS-0414: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0414: EPA Notice of Availability of a Final Environmental Impact Statement Energia Sierra Juarez Transmission Project EPA announces the availability of the Final...

  6. Research in theoretical nuclear and neutrino physics. Final report...

    Office of Scientific and Technical Information (OSTI)

    Research in theoretical nuclear and neutrino physics. Final report Citation Details In-Document Search Title: Research in theoretical nuclear and neutrino physics. Final report The ...

  7. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0468: Final Environmental Impact Statement EA-1607: Final Environmental Assessment Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium...

  8. EIS-0317-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Impact Statement EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  9. EIS-0082-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    S1: Final Supplemental Environmental Impact Statement EIS-0082-S1: Final Supplemental Environmental Impact Statement The Department of Energy (DOE) limits electronic access to...

  10. National Fuel Cell Electric Vehicle Learning Demonstration Final...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cell Electric Vehicle Learning Demonstration Final Report National Fuel Cell Electric Vehicle Learning Demonstration Final Report This report discusses key analysis results...

  11. ITP Glass: Industrial Glass Bandwidth Analysis Final Report,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industrial Glass Bandwidth Analysis Final Report, August 2007 ITP Glass: Industrial Glass Bandwidth Analysis Final Report, August 2007 industrialbandwidth.pdf More Documents &...

  12. EIS-0108: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    108: Final Environmental Impact Statement EIS-0108: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

  13. EIS-0219: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Impact Statement EIS-0219: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

  14. EIS-0427: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of a Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona EPA announces the availability of the Final...

  15. EIS-0309: Final Site-Wide Environmental Impact Statement | Department...

    Energy Savers [EERE]

    09: Final Site-Wide Environmental Impact Statement EIS-0309: Final Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA...

  16. EIS-0468: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0468: EPA Notice of Availability of the Final Environmental Impact Statement American Centrifuge Plant, Piketon, OH EIS No. 20110153, Final EIS, DOE,...

  17. Final Report Appendices: Preliminary Process and Market Evaluation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Final Report Appendices: Preliminary Process and Market Evaluation: Better...

  18. EIS-0350-SA-02: Final Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    350-SA-02: Final Supplement Analysis EIS-0350-SA-02: Final Supplement Analysis Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los...

  19. Final Report on Statistical Debugging for Petascale Environments...

    Office of Scientific and Technical Information (OSTI)

    Final Report on Statistical Debugging for Petascale Environments Citation Details In-Document Search Title: Final Report on Statistical Debugging for Petascale Environments ...

  20. EA-1938: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1938: Final Environmental Assessment Grieve Unit CO2 Enhanced Recovery Project, Natrona County, WY The Bureau of Land Management prepared, with...

  1. EIS-0377: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project A systems study was carried out to identify...

  2. Final Rule on Amending Eligibility Provisions to Multifamily...

    Energy Savers [EERE]

    Final Rule on Amending Eligibility Provisions to Multifamily Buildings for the Weatherization Assistance Program Final Rule on Amending Eligibility Provisions to Multifamily...

  3. Geothermal Exploration Techniques a Case Study. Final Report...

    Open Energy Info (EERE)

    Techniques a Case Study. Final Report Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Geothermal Exploration Techniques a Case Study. Final Report...

  4. EIS-0332: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project This document is the final Environmental Impact Statement...

  5. Atmospheric Line of Site Experiment (ALOSE) Final Campaign Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (ALOSE) Final Campaign Summary W Smith S Green M Howard M Yesalusky N Modlin ... (ALOSE) Final Campaign Summary W Smith, Sr., Hampton UniversityUniversity of ...

  6. EA-1855: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1855: Final Environmental Assessment Creston-Bell Rebuild Project, Lincoln and Spokane Counties, Washington (aka DOEEA-4406) This EA evaluates...

  7. Final Scientific/Technical Report for Project entitled "Mechanism...

    Office of Scientific and Technical Information (OSTI)

    Final ScientificTechnical Report for Project entitled "Mechanism of Uranium Reduction by Shewanella oneidensis" Citation Details In-Document Search Title: Final Scientific...

  8. EIS-0503: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0503: EPA Notice of Availability of Final Environmental Impact Statement New England Clean Power Link, Vermont DOE prepared this Final EIS to evaluate the...

  9. ATVM Loan Program Interim Final Rule (November 12, 2008) | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Incentive Program ATVM Loan Program Interim Final Rule More Documents & Publications Automotive Trade Policy Council: Proposed Interim Final Rule Updated Guidance For Applicants To...

  10. NNSS Final Site-Wide Environmental Impact Statement (SWEIS) ...

    National Nuclear Security Administration (NNSA)

    Office of General Counsel National Environmental Policy Act (NEPA) NEPA Reading Room NNSS Final Site-Wide Environmental Impact Statement (SWEIS) ... NNSS Final Site-Wide...

  11. Dynamical systems probabilistic risk assessment.

    SciTech Connect (OSTI)

    Denman, Matthew R.; Ames, Arlo Leroy

    2014-03-01

    Probabilistic Risk Assessment (PRA) is the primary tool used to risk-inform nuclear power regulatory and licensing activities. Risk-informed regulations are intended to reduce inherent conservatism in regulatory metrics (e.g., allowable operating conditions and technical specifications) which are built into the regulatory framework by quantifying both the total risk profile as well as the change in the risk profile caused by an event or action (e.g., in-service inspection procedures or power uprates). Dynamical Systems (DS) analysis has been used to understand unintended time-dependent feedbacks in both industrial and organizational settings. In dynamical systems analysis, feedback loops can be characterized and studied as a function of time to describe the changes to the reliability of plant Structures, Systems and Components (SSCs). While DS has been used in many subject areas, some even within the PRA community, it has not been applied toward creating long-time horizon, dynamic PRAs (with time scales ranging between days and decades depending upon the analysis). Understanding slowly developing dynamic effects, such as wear-out, on SSC reliabilities may be instrumental in ensuring a safely and reliably operating nuclear fleet. Improving the estimation of a plant's continuously changing risk profile will allow for more meaningful risk insights, greater stakeholder confidence in risk insights, and increased operational flexibility.

  12. Modeling of GE Appliances: Final Presentation

    SciTech Connect (OSTI)

    Fuller, Jason C.; Vyakaranam, Bharat; Leistritz, Sean M.; Parker, Graham B.

    2013-01-31

    This report is the final in a series of three reports funded by U.S. Department of Energy Office of Electricity Delivery and Energy Reliability (DOE-OE) in collaboration with GE Appliances’ through a Cooperative Research and Development Agreement (CRADA) to describe the potential of GE Appliances’ DR-enabled appliances to provide benefits to the utility grid.

  13. Final Vitrification Melter And Vessels Evaluation Documentation

    Broader source: Energy.gov [DOE]

    DOE has prepared final evaluations and made waste incidental to reprocessing determinations for the vitrification melter and feed vessels (the concentrator feed makeup tank and the melter feed hold tank), used by DOE’s West Valley Demonstration Project as part of the process to vitrify waste from prior commercial reprocessing of spent nuclear fuel.

  14. Final Participant List | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Participant List Final Participant List List of the participants in the 2005 Workshop on Manufacturing for the Hydrogen Economy PDF icon mfg_wkshp_particpicants.pdf More Documents & Publications Roadmap on Manufacturing R&D for the Hydrogen Economy Transportation and Stationary Power Integration Workshop Attendees List DOE Fuel Cell Pre-Solicitiation Workshop Participants List

  15. Final Environmental Assessment Sleeping Giant Hydropower Project

    Office of Environmental Management (EM)

    Environmental Assessment Sleeping Giant Hydropower Project Montana Area Office Great Plains Region November 2015 Adopted 1/11/2016 by Western Area Power Administration as DOE/EA-2022 Final Environmental Assessment Sleeping Giant Hydropower Project Table of Contents (Page 1 of 3) CHAPTER 1 - INTRODUCTION .................................................................................................................... 1 PROPOSED ACTION

  16. Microsoft PowerPoint - WIPP Recovery Workshop_Final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    thresholds were established for the Interim PMB and used to grade risks. Risk handling strategies were developed for risks and the post handling impact data used to derive a...

  17. Tank waste remediation system risk management list

    SciTech Connect (OSTI)

    Collard, L.B.

    1995-10-31

    The Tank Waste Remedation System (TWRS) Risk Management List and it`s subset of critical risks, the Critical Risk Management List, provide a tool to senior RL and WHC management (Level-1 and -2) to manage programmatic risks that may significantly impact the TWRS program. The programmatic risks include cost, schedule, and performance risks. Performance risk includes technical risk, supportability risk (such as maintainability and availability), and external risk (i.e., beyond program control, for example, changes in regulations). The risk information includes a description, its impacts, as evaluation of the likelihood, consequences and risk value, possible mitigating actions, and responsible RL and WHC managers. The issues that typically form the basis for the risks are presented in a separate table and the affected functions are provided on the management lists.

  18. PRA and Risk Informed Analysis

    SciTech Connect (OSTI)

    Bernsen, Sidney A.; Simonen, Fredric A.; Balkey, Kenneth R.

    2006-01-01

    The Boiler and Pressure Vessel Code (BPVC) of the American Society of Mechanical Engineers (ASME) has introduced a risk based approach into Section XI that covers Rules for Inservice Inspection of Nuclear Power Plant Components. The risk based approach requires application of the probabilistic risk assessments (PRA). Because no industry consensus standard existed for PRAs, ASME has developed a standard to evaluate the quality level of an available PRA needed to support a given risk based application. The paper describes the PRA standard, Section XI application of PRAs, and plans for broader applications of PRAs to other ASME nuclear codes and standards. The paper addresses several specific topics of interest to Section XI. Important consideration are special methods (surrogate components) used to overcome the lack of PRA treatments of passive components in PRAs. The approach allows calculations of conditional core damage probabilities both for component failures that cause initiating events and failures in standby systems that decrease the availability of these systems. The paper relates the explicit risk based methods of the new Section XI code cases to the implicit consideration of risk used in the development of Section XI. Other topics include the needed interactions of ISI engineers, plant operating staff, PRA specialists, and members of expert panels that review the risk based programs.

  19. Risk assessment in international operations

    SciTech Connect (OSTI)

    Stricklin, Daniela L.

    2008-11-15

    During international peace-keeping missions, a diverse number of non-battle hazards may be encountered, which range from heavily polluted areas, endemic disease, toxic industrial materials, local violence, traffic, and even psychological factors. Hence, elevated risk levels from a variety of sources are encountered during deployments. With the emphasis within the Swedish military moving from national defense towards prioritization of international missions in atypical environments, the risk of health consequences, including long term health effects, has received greater consideration. The Swedish military is interested in designing an optimal approach for assessment of health threats during deployments. The Medical Intelligence group at FOI CBRN Security and Defence in Umea has, on request from and in collaboration with the Swedish Armed Forces, reviewed a variety of international health threat and risk assessment models for military operations. Application of risk assessment methods used in different phases of military operations will be reviewed. An overview of different international approaches used in operational risk management (ORM) will be presented as well as a discussion of the specific needs and constraints for health risk assessment in military operations. This work highlights the specific challenges of risk assessment that are unique to the deployment setting such as the assessment of exposures to a variety of diverse hazards concurrently.

  20. AVLIS Criticality risk assessment

    SciTech Connect (OSTI)

    Brereton, S.J., LLNL

    1998-04-29

    Evaluation of criticality safety has become an important task in preparing for the Atomic Vapor Laser Isotope Separation (AVLIS) uranium enrichment runs that will take place during the Integrated Process Demonstration (IPD) at Lawrence Livermore National Laboratory (LLNL). This integrated operation of AVLIS systems under plant-like conditions will be used to verify the performance of process equipment and to demonstrate the sustained integrated enrichment performance of these systems using operating parameters that are similar to production plant specifications. Because of the potential criticality concerns associated with enriched uranium, substantial effort has been aimed towards understanding the potential system failures of interest from a criticality standpoint, and evaluating them in detail. The AVLIS process is based on selective photoionization of uranium atoms of atomic weight 235 (U-235) in a vapor stream, followed by electrostatic extraction. The process is illustrated in Figure 1. Two major subsystems are involved: the uranium separator and the laser system. In the separator, metallic uranium is fed into a crucible where it is heated and vaporized by an electron beam. The atomic U-235/U-238 vapor stream moves away from the molten uranium and is illuminated by precisely tuned beams of dye laser light. Upon absorption of the tuned dye laser light, the U-235 atoms become excited and eject electrons (become photoionized), giving them a net positive charge. The ions of U-235 are moved preferentially by an electrostatic field to condense on the product collector, forming the enriched uranium product. The remaining vapor, which is depleted in U-235 (tails), passes unaffected through the photoionization/extractor zone and accumulates on collectors in the top of the separator. Tails and product collector surfaces operate at elevated temperatures so that deposited materials flow as segregated liquid streams. The separated uranium condensates (uranium enriched in U-235 and uranium depleted in U-235) are cooled and accumulated in solid metallic form in canisters. The collected product and tails material is weighed and transferred into certified, critically safe, shipping containers (DOT specification 6M with 2R containment vessel). These will be temporarily stored, and then shipped offsite either for use by a fuel fabricator, or for disposal. Tails material will be packaged for disposal. A criticality risk assessment was performed for AVLIS IPD runs. In this analysis, the likelihood of occurrence of a criticality was examined. For the AVLIS process, there are a number of areas that have been specifically examined to assess whether or not the frequency of occurrence of a criticality is credible (frequency of occurrence > 10-6/yr). In this paper, we discuss only two of the areas: the separator and canister operations.

  1. Public Discourse in Energy Policy Decision-Making: Final Report

    SciTech Connect (OSTI)

    Idaho Citizen; Eileen DeShazo; John Freemuth; Tina Giannini; Troy Hall; Ann Hunter; Jeffrey C. Joe; Michael Louis; Carole Nemnich; Jennie Newman; Steven J. Piet; Stephen Sorensen; Paulina Starkey; Kendelle Vogt; Patrick Wilson

    2010-08-01

    The ground is littered with projects that failed because of strong public opposition, including natural gas and coal power plants proposed in Idaho over the past several years. This joint project , of the Idaho National Laboratory, Boise State University, Idaho State University and University of Idaho has aimed to add to the tool box to reduce project risk through encouraging the public to engage in more critical thought and be more actively involved in public or social issues. Early in a project, project managers and decision-makers can talk with no one, pro and con stakeholder groups, or members of the public. Experience has shown that talking with no one outside of the project incurs high risk because opposition stakeholders have many means to stop most (if not all) energy projects. Talking with organized stakeholder groups provides some risk reduction from mutual learning, but organized groups tend not to change positions except under conditions of a negotiated settlement. Achieving a negotiated settlement may be impossible. Furthermore, opposition often arises outside pre-existing groups. Standard public polling provides some information but does not reveal underlying motivations, intensity of attitudes, etc. Improved methods are needed that probe deeper into stakeholder (organized groups and members of the public) values and beliefs/heuristics to increase the potential for change of opinions and/or out-of-box solutions. The term “heuristics” refers to the mental short-cuts, underlying beliefs, and paradigms that everyone uses to filter and interpret information, to interpret what is around us, and to guide our actions and decisions. This document is the final report of a 3-year effort to test different public discourse methods in the subject area of energy policy decision-making. We analyzed 504 mail-in surveys and 80 participants in groups on the Boise State University campus for their preference, financial support, and evaluations of eight attributes for energy conservation and efficiency, fossil fuels, nuclear energy, hydropower, and renewable energy. All participants saw a 7-person diverse energy expert panel. Some participants attended deliberation sessions; some received a 35-page briefing document that included pros and cons of the different energy options.

  2. EIS-0050-S: Final Supplemental Impact Statement | Department of Energy

    Energy Savers [EERE]

    50-S: Final Supplemental Impact Statement EIS-0050-S: Final Supplemental Impact Statement Commercial and Apartment Conservation Service Program, Supplemental PDF icon EIS-0050_SEIS.pdf More Documents & Publications EIS-0095: Final Environmental Impact Statement EIS-0102: Final Environmental Impact Statement EIS-0127

  3. NTSF Spring 2010 Final Agenda | Department of Energy

    Office of Environmental Management (EM)

    0 Final Agenda NTSF Spring 2010 Final Agenda Final Agenda for the U.S. Department of Energy's National Transportation Stakeholder Forum taking place in Chicago, Illinois. PDF icon Final Agenda More Documents & Publications NTSF 2014 Meeting Agenda NTSF Spring 2014 Preliminary Agenda NTSF Spring 2011

  4. Final Report Appendices: Preliminary Process and Market Evaluation: Better

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings Neighborhood Program | Department of Energy Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program, December 2012. PDF icon Final Report Appendices More Documents & Publications Preliminary Process and Market

  5. EIS-0068: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    8: Final Environmental Impact Statement EIS-0068: Final Environmental Impact Statement Development Policy Options for the Naval Oil Shale Reserves in Colorado PDF icon EIS-0068: Final Environmental Impact Statement More Documents & Publications EIS-0070: Draft Environmental Impact Statement EIS-0085-S: Final Environmental Impact Statement EIS-0071

  6. EIS-0073: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0073: Final Environmental Impact Statement Solvent Refined Coal-I Demonstration Project, Daviess County, Kentucky PDF icon EIS-0073-FEIS-volume1.pdf PDF icon EIS-0073-FEIS-volume2.pdf More Documents & Publications EIS-0069: Final Environmental Impact Statement EIS-0098: Final Environmental Impact Statement EIS-0071

  7. SPR Acquisition Procedures - Final Rulemaking | Department of Energy

    Energy Savers [EERE]

    Acquisition Procedures - Final Rulemaking SPR Acquisition Procedures - Final Rulemaking Point of Contact: Nathan Harvey, Director of Operatons and Readiness, Strategic Petroleum Reserve, (202) 586-4691 PDF icon SPR Crude Oil Acquisition Procedures - Final Rulemaking More Documents & Publications 2009 SPR Report to Congress Historical SPR Annual Reports to Congress Price Competitive Sale of Strategic Petroleum Reserve Petroleum; Standard Sales Provisions; Final Rule

  8. 30 Day Federal Register Notice Extension - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension - FINAL 30 Day Federal Register Notice Extension - FINAL PDF icon 30DAY Federal Register Notice Extension-Final.pdf More Documents & Publications 60 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Proposed

  9. 30 Day Federal Register Notice Proposed - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed - FINAL 30 Day Federal Register Notice Proposed - FINAL PDF icon 30DAY Federal Resigter Notice Proposed-Final.pdf More Documents & Publications 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Extension - FINAL 60 Day Federal Register Notice Extension

  10. Microsoft PowerPoint - Tsinghua Slideshow final for distribution (2) |

    Office of Environmental Management (EM)

    Department of Energy Tsinghua Slideshow final for distribution (2) Microsoft PowerPoint - Tsinghua Slideshow final for distribution (2) PDF icon Microsoft PowerPoint - Tsinghua Slideshow final for distribution (2) More Documents & Publications Microsoft PowerPoint - Final translated version of Tsinghua Speech Idaho Operations AMWTP Fact Sheet Methane Hydrate R&D

  11. EIS-0071: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    1: Final Environmental Impact Statement EIS-0071: Final Environmental Impact Statement Memphis Light, Gas and Water Division Industrial Fuels Gas Demonstration Plant, Memphis, Shelby County, Tennessee PDF icon EIS-0071-FEIS.pdf More Documents & Publications EIS-0069: Final Environmental Impact Statement EIS-0073: Final Environmental Impact Statement EIS-0102

  12. EIS-0085-S: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    5-S: Final Environmental Impact Statement EIS-0085-S: Final Environmental Impact Statement Liquid-Metal Fast Breeder Reactor Program, Supplemental PDF icon EIS-0085-FSEIS.pdf More Documents & Publications EIS-0018: Final Environmental Impact Statement EIS-0068: Final Environmental Impact Statement EIS-0071

  13. EIS-0116: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    6: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project PDF icon EIS-0116-FEIS.pdf More Documents & Publications EIS-0005-FS: Draft Supplemental Environmental Impact Statement EIS-0112: Final Environmental Impact Statement EIS-0048-S: Final Supplemental Environmental Impact Statement to FES-75-79

  14. Risk Management Techniques and Practice Workshop Workshop Report

    SciTech Connect (OSTI)

    Quinn, T; Zosel, M

    2008-12-02

    At the request of the Department of Energy (DOE) Office of Science (SC), Lawrence Livermore National Laboratory (LLNL) hosted a two-day Risk Management Techniques and Practice (RMTAP) workshop held September 18-19 at the Hotel Nikko in San Francisco. The purpose of the workshop, which was sponsored by the SC/Advanced Scientific Computing Research (ASCR) program and the National Nuclear Security Administration (NNSA)/Advanced Simulation and Computing (ASC) program, was to assess current and emerging techniques, practices, and lessons learned for effectively identifying, understanding, managing, and mitigating the risks associated with acquiring leading-edge computing systems at high-performance computing centers (HPCCs). Representatives from fifteen high-performance computing (HPC) organizations, four HPC vendor partners, and three government agencies attended the workshop. The overall workshop findings were: (1) Standard risk management techniques and tools are in the aggregate applicable to projects at HPCCs and are commonly employed by the HPC community; (2) HPC projects have characteristics that necessitate a tailoring of the standard risk management practices; (3) All HPCC acquisition projects can benefit by employing risk management, but the specific choice of risk management processes and tools is less important to the success of the project; (4) The special relationship between the HPCCs and HPC vendors must be reflected in the risk management strategy; (5) Best practices findings include developing a prioritized risk register with special attention to the top risks, establishing a practice of regular meetings and status updates with the platform partner, supporting regular and open reviews that engage the interests and expertise of a wide range of staff and stakeholders, and documenting and sharing the acquisition/build/deployment experience; and (6) Top risk categories include system scaling issues, request for proposal/contract and acceptance testing, and vendor technical or business problems. HPC, by its very nature, is an exercise in multi-level risk management. Every aspect of stewarding HPCCs into the petascale era, from identification of the program drivers to the details of procurement actions and simulation environment component deployments, represents unprecedented challenges and requires effective risk management. The fundamental purpose of this workshop was to go beyond risk management processes as such and learn how to weave effective risk management practices, techniques, and methods into all aspects of migrating HPCCs into the next generation of leadership computing systems. This workshop was a follow-on to the Petascale System Integration Workshop hosted by Lawrence Berkeley National Laboratory (LBNL)/NERSC last year. It was intended to leverage and extend the risk management experience of the participants by looking for common best practices and unique processes that have been especially successful. This workshop assessed the effectiveness of tools and techniques that are or could be helpful in HPCC risk management, with a special emphasis on how practice meets process. As the saying goes: 'In theory, there is no difference between theory and practice. In practice there is'. Finally, the workshop brought together a network of experts who shared information as technology moves into the petascale era and beyond.

  15. Bench Scale Project - Final Report - 063014

    Office of Scientific and Technical Information (OSTI)

    Solvent System for Post Combustion C 02 Capture ION Engineering, LLC. Department of Energy (DOE) National Energy Technology Laboratory (NETL) Project Award No. DE-FE0005799 Final Technical / Scientific Report Novel Solvent System for Post Combustion C 02 Capture Principal Investigator: Alfred Brown Principal Author: Nathan Brown Ion Engineering, Inc. 3052 Sterling Circle Boulder, CO 80301 October 1, 2010 September 30, 2013 Acknowledgement: This material is based upon work supported by the

  16. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    2 Appliances in U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,"Total U.S.1 (millions)",,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes"

  17. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    8 Home Appliances in Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census Division",,,"Middle Atlantic Census Division" ,"Total U.S.1 (millions)",,"Total New England",,,"Total Middle Atlantic" ,,"Total Northeast",,,"CT, ME, NH, RI, VT" "Home

  18. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    8 Household Demographics of Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census Division",,,"Middle Atlantic Census Division" ,"Total U.S.1 (millions)",,"Total New England",,,"Total Middle Atlantic" ,,"Total Northeast",,,"CT, ME, NH, RI, VT" "Household

  19. Laboratory awards final Recovery Act demolition contracts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recovery Act demolition contracts Laboratory awards final Recovery Act demolition contracts The two winning bidders will each demolish a portion of the remaining unused buildings at the Lab's historic Technical Area 21. April 20, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

  20. EERE Quality Control Workshop Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EERE Quality Control Workshop Final Report Proceedings from the EERE Quality Control Workshop, in support of the DOE Clean Energy Manufacturing Initiative Golden, Colorado December 9-10, 2013 Workshop Proceedings NREL/BK-5900-61889 May 2014 NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Operated by the Alliance for Sustainable Energy, LLC This report is available at no cost from the National Renewable Energy Laboratory (NREL) at

  1. Critical Materials Workshop Final Participant List

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Critical Materials Workshop April 3, 2012 â–  Arlington, VA Final Participant Listing Georg Abakumov ADMA Products Inc. Anderson Ames Laboratory Julie Anderson Golden Field Office Gretchen Baier The Dow Chemical Company Suresh Baskaran Pacific Northwest National Laboratory James Beals UTRC Bianca Beeks ITECS Innovative Steven Boyd DOE Vehicle Technologies Richard Brotzman Argonne National Laboratory Matt Brown McBee Strategic Consulting Gordon Brown SLAC National Accelerator Laboratory Stephanie

  2. Microsoft Word - Final EA- ADM.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    28 Final Environmental Assessment Industrial Carbon Capture and Sequestration (ICCS) Area 1 Project "CO 2 Capture from Biofuels Production and Sequestration into the Mt. Simon Sandstone" Archer Daniels Midland Company Decatur, Illinois For U.S. Department of Energy National Energy Technology Laboratory DE-FE0001547 April 2011 ACKNOWLEDGEMENT This report was prepared with the support of the U.S. Department of Energy (DOE) under Award No. DE-FE0001547 (Recovery Act - Industrial Carbon

  3. Final Rule Technical Amendment | Department of Energy

    Office of Environmental Management (EM)

    Technical Amendment Final Rule Technical Amendment Federal Register Announcement: The Department of Energy (DOE) is publishing this technical amendment to the regulations for the loan guarantee program authorized by Section 1703 of Title XVII of the Energy Policy Act of 2005 (Title XVII) to incorporate, without substantive change, an amendment to Section 1702(b) of Title XVII enacted by Section 305 of the Consolidated Appropriations Act, 2012. PDF icon Loan Guarantees for Projects That Employ

  4. Microsoft Word - NEAC NEAMS_ Final 2012 Report

    Office of Environmental Management (EM)

    NEAMS (NEAC) Program Review Final Report Introduction At the outset of FY2012, Dr. Pete Lyons (through NEAC Chairman William Martin) chartered a subcommittee of the DOE Nuclear Energy Advisory Committee (NEAC) to conduct a program review of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, and to provide recommendations to the Assistant Secretary for Nuclear Energy through the NEAC channel. The recommendations would address the "efficacy of the prioritization and

  5. Reaching the hip-hop generation: Final (symposium proceedings) report

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The goal of this final (closing) report is to capture the flavor of the symposium held March 1 and 2, 1993 in New York City convened by Motivational Educational Entertainment, Inc. (MEE), a black-owned communications research, consulting, and video production company based in Philadelphia, Pennsylvania. The mission of MEE is to understand, reach, and positively affect inner-city youth. Traditional communication approaches from mainstream sources to at-risk youth often don`t account for the unique way youth communicate among themselves and how they relate to the media. This understanding, however, is crucial. To understand youth communication, the people who create and send both entertaining and educational messages to urban youth must be brought into the dialogue. The meeting in New York was intended to provide an important opportunity for senders to meet and evaluate the appropriateness and effectiveness of their messages. In addition, the MEE symposium provided a forum for the continuing public debate about what needs to be done to reach today`s urban teens. Included in this document is a description of symposium goals/objectives, symposium activities, the reaction to and analysis of the symposium, recommendations for future MEE courses of action, and an appendix containing copies of press articles.

  6. Finally Underway: Implementation of the Port Hope Area Initiative - 13151

    SciTech Connect (OSTI)

    Fahey, Christine A.; Palmeter, Tim; Blanchette, Marcia

    2013-07-01

    Two distinct yet closely related waste remediation projects are finally underway in Canada under the Port Hope Area Initiative (PHAI) which aims to clean up 1.7 million cubic metres (m{sup 3}) of low-level radioactive waste (LLRW) arising from 60 years of uranium and radium operations. Under the PHAI, the Port Hope Project and the smaller Port Granby Project will result in the consolidation of the LLRW within two highly engineered, above-ground mounds, to be constructed within the municipalities of Port Hope and Clarington. These projects will fulfill the federal government commitment to the safe, long-term management of the LLRW, as set out in the legal agreement signed by the government and the host municipalities in 2001. The federal authorization to commence PHAI Remediation and Construction Phase 2 was received in late 2011 and several enabling infrastructure construction and radiological survey contracts were awarded in 2012. The contracts to remediate the waste sites and construct the new engineered mounds will be tendered in 2013. At the end of Phase 2, environmental risks will be substantially mitigated, land development restrictions lifted, and an honourable legacy left for future generations. (authors)

  7. Federal program for regulating highly hazardous materials finally takes off

    SciTech Connect (OSTI)

    Lessard, P.C. [Block Environmental Services Inc., Pleasant Hill, CA (United States)

    1996-11-01

    The Risk Management Program (RMP) rule, Section 112(r) of the Clean Air Act (CAA), was signed on May 24 and finalized on June 20. RMP is one of the most comprehensive, technically based regulatory programs for preventing, detecting and responding to accidental hazardous materials releases to have been issued in recent times. Although facilities have three years to comply, EPA estimates that the rule will affect an estimated 66,000 facilities that store highly hazardous or acutely toxic materials. The 1990 CAA Amendments are designed to prevent accidental releases of highly hazardous chemicals from stationary sources. Two significant regulatory programs that have emerged from the revised CAA are the Process Safety Management (PSM) standard and RMP. PSM is designed to protect employees and regulated by the Occupational Safety and Health Administration. RMP`s purpose is to protect the public and the environment from highly hazardous chemicals. It authorizes EPA to create a list of substances (distinct from the list generated under PSM) known to cause serious adverse effects and to implement a program for accidental chemical release prevention.

  8. Evaluation of the Better Buildings Neighborhood Program, Final Synthesis

    Office of Environmental Management (EM)

    Report, Volume 1 | Department of Energy Better Buildings Neighborhood Program, Final Synthesis Report, Volume 1 Evaluation of the Better Buildings Neighborhood Program, Final Synthesis Report, Volume 1 Final Report: Evaluation of the Better Buildings Neighborhood Program, Final Synthesis Report, Volume 1, American Recovery and Reinvestment Act of 2009, June 2015. Prepared for U.S. Department of Energy Office of Energy Efficiency and Renewable Energy. PDF icon Evaluation of BBNP, Final

  9. Interim Final Rule and Proposed Rule | Department of Energy

    Office of Environmental Management (EM)

    Interim Final Rule and Proposed Rule Interim Final Rule and Proposed Rule Extracted Pages from the Interim Final Rule and Proposed Rule, September 19, 2008 PDF icon Interim Final Rule and Proposed Rule More Documents & Publications Comments of the Staff of the public utilities commission of the state of California on the interim final rule Comments on Notice of Proposed Rulemaking for Coordination of Federal Authorizations for Electric Transmission Facilities Changes recommended by OIRA

  10. Market Effects of the Better Buildings Neighborhood Program, Final

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation Volume 5 | Department of Energy Market Effects of the Better Buildings Neighborhood Program, Final Evaluation Volume 5 Market Effects of the Better Buildings Neighborhood Program, Final Evaluation Volume 5 Final Report: Market Effects of the Better Buildings Neighborhood Program, Final Evaluation Volume 5, American Recovery and Reinvestment Act of 2009, June 2015. PDF icon Market Effects of BBNP, Final Evaluation Volume 5 More Documents & Publications Evaluation of the Better

  11. EA-1338: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    8: Final Environmental Assessment EA-1338: Final Environmental Assessment Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership This EA evaluates the environmental impacts for the proposed transfer of real and personal property at the U.S. Department of Energy's Grand Junction Office to non-DOE ownership. PDF icon EA-1338-FEA-2000.PDF More Documents & Publications EA-1399: Final Environmental Assessment EA-1312: Final Environmental Assessment EA-0930: Final

  12. EA-1510: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    0: Final Environmental Assessment EA-1510: Final Environmental Assessment Alternate Financed Facility Modernization The purpose of the Proposed Action is to transfer two parcels of real estate at Y-12, under Section 161(g) of the Atomic Energy Act (AEA), to a private development corporation. PDF icon DOE/EA-1510; Final Environmental Assessment for the Alternate Financed Facility Modernization (January 2005) More Documents & Publications EA-1593: Final Environmental Assessment EA-2014: Final

  13. EIS-0145: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0145: Final Environmental Impact Statement Non-Federal Participation in Alternating Current Intertie PDF icon DOE/EIS-0145, Bonneville Power Administration, Summary Non-Federal Participation in AC Intertie Final Environmental Impact Statement (January 1994) PDF icon EIS-0145-FEIS-01-1994_0.pdf PDF icon EIS-0145-FEIS-02-1994_0.pdf More Documents & Publications EIS-0197: Final Environmental Impact Statement EIS-0125: Final Environmental Impact

  14. EIS-0158: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    58: Final Environmental Impact Statement EIS-0158: Final Environmental Impact Statement Supplemental Environmental Impact Statement to the 1979 Petroleum Production at Maximum Efficient Rate, Naval Petroleum Reserve No. 1(Elk Hills), Kern County, California (This EIS supplements DOE/EIS-0012.) PDF icon EIS-0158-FEIS.pdf More Documents & Publications EA-0962: Final Environmental Assessment EA-1956: Final Environmental Assessment EIS-0012: Final

  15. ESPC ENABLE Final Proposal Requirements | Department of Energy

    Office of Environmental Management (EM)

    Final Proposal Requirements ESPC ENABLE Final Proposal Requirements Document describes the final proposal requirements for consideration by an energy service company (ESCO) for an agency's Request for Quote/Notice of Opportunity or final proposal. If selected to perform a site investment grade audit, the ESCO will be required to present the findings from the IGA and a project price to the agency in the form of a final proposal. File enable_proposalreqs.docx More Documents & Publications ESPC

  16. Integrated risk information system (IRIS)

    SciTech Connect (OSTI)

    Tuxen, L.

    1990-12-31

    The Integrated Risk Information System (IRIS) is an electronic information system developed by the US Environmental Protection Agency (EPA) containing information related to health risk assessment. IRIS is the Agency`s primary vehicle for communication of chronic health hazard information that represents Agency consensus following comprehensive review by intra-Agency work groups. The original purpose for developing IRIS was to provide guidance to EPA personnel in making risk management decisions. This original purpose for developing IRIS was to guidance to EPA personnel in making risk management decisions. This role has expanded and evolved with wider access and use of the system. IRIS contains chemical-specific information in summary format for approximately 500 chemicals. IRIS is available to the general public on the National Library of Medicine`s Toxicology Data Network (TOXNET) and on diskettes through the National Technical Information Service (NTIS).

  17. Sandia Energy - Security Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Risk Assessmentcwdd2015-05-04T21:05:48+00:00 security Water Treatment Facility Definition Security is assuring that water sources and water distribution systems are...

  18. Corporate planning for compliance with EPA`s proposed risk management program rule

    SciTech Connect (OSTI)

    Mannan, M.; Keeney, R.C.

    1995-12-31

    On October 20, 1993, the US Environmental Protection Agency (EPA) published in the Federal Register the proposed rule entitled Risk Management Programs for Chemical Accidental Release Prevention (40 CFR 68). Subsequently, on January 31, 1994, EPA published in the Federal Register the finalized list of 77 regulated toxic substances and 63 regulated flammable substances that are to be covered under the rule along with the associated threshold quantities for each substance. This list of substances will dictate which stationary sources will have to comply with the requirements of the proposed risk management program rule. The risk management program rule will most likely be finalized sometime after mid-1995. Covered facilities will then have a total of three years to achieve complete compliance with the requirements of the rule. This paper presents an approach for corporations with multiple sites to develop action plans for implementation of the risk management program rule. The process starts with a determination of which facilities are potentially covered, development of a matrix of requirements that each facility must comply with, and finally, common strategies that may be used in achieving compliance. Thus, a multi-facility corporation can develop a baseline compliance guideline document that individual plants can use in developing and implementing their risk management programs.

  19. Final_Groundwater_flowchart_June07.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REMEDIATE AND RESTORE GROUNDWATER TO HIGHEST BENEFICIAL USE â–  Groundwater is to be cleaned up and restored to the highest bene cial use.* â–  Restoration should be within a reasonable time frame, commensurate with risk and Tri-Party Agreement timelines. â–  Ongoing groundwater remediation activities and review processes should be fully funded. â–  Technology development should continually be pursued to remediate and restore groundwater to highest bene cial use.* â–  The public and tribes must

  20. Microsoft Word - Highlights final.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 1 March 2006 Short-Term Energy Outlook March 7, 2006 Release Overview Continued steady world oil demand growth, combined with only modest increases in world spare oil production capacity, and the continuing risks of geopolitical instability, are expected to keep crude oil prices high through 2006. The price of West Texas Intermediate (WTI) crude oil is projected to average $64 per barrel in 2006 and $61 in 2007 (Figure 1. West Texas Intermediate Crude Oil Price). While the average retail price

  1. ORISE: Crisis and Risk Communication

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crisis and Risk Communication Crisis and Risk Communication Because a natural disaster, act of terrorism or other public emergency can happen without notice, having a planned, coordinated communication effort is necessary to help alleviate public anxiety during times of uncertainty. The Oak Ridge Institute for Science and Education (ORISE) helps prepare government agencies and organizations manage the communication aspects of emergency response. Whether this involves creating crisis

  2. High Risk Plan | Department of Energy

    Energy Savers [EERE]

    Risk Plan High Risk Plan PDF icon High Risk Plan More Documents & Publications DOE Site Facility Management Contracts Internet Posting DOE Head of Contracting Activity and Procurement Directors' Directory - Sept 25 2015 OPAM Policy Acquisition Guides

  3. Mobius Risk Group LLC | Open Energy Information

    Open Energy Info (EERE)

    Mobius Risk Group LLC Jump to: navigation, search Name: Mobius Risk Group LLC Place: Houston, Texas Zip: TX 77056 Product: A risk advisor to energy-consuming companies, utilities...

  4. Risk Management Process Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    has two primary components: the risk management model and the the risk management cycle. ... Tier 1: Organization Tier 2: Mission and Business Process Tier 3: Information ...

  5. Report: Technical Uncertainty and Risk Reduction

    Office of Environmental Management (EM)

    TECHNICAL UNCERTAINTY AND RISK REDUCTION Background In FY 2007 EMAB was tasked to assess EM's ability to reduce risk and technical uncertainty. Board members explored this topic...

  6. AMERIND Risk Annual Conference and Trade Fair

    Broader source: Energy.gov [DOE]

    Hosted by the AMERIND Risk, this three-day conference includes trainings in risk management, workers' safety, human resources, and more.

  7. Envisory Financial Risk Management | Open Energy Information

    Open Energy Info (EERE)

    Envisory Financial Risk Management Jump to: navigation, search Name: Envisory Financial Risk Management Place: Mnchen, Bavaria, Germany Zip: 80331 Sector: Renewable Energy...

  8. Risk Assessment of Cascading Outages: Methodologies and Challenges

    SciTech Connect (OSTI)

    Vaiman, Marianna; Bell, Keith; Chen, Yousu; Chowdhury, Badrul; Dobson, Ian; Hines, Paul; Papic, Milorad; Miller, Stephen; Zhang, Pei

    2012-05-31

    Abstract- This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the first of two new papers, which extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. This paper is intended to be a reference document to summarize the state of the art in the methodologies for performing risk assessment of cascading outages caused by some initiating event(s). A risk assessment should cover the entire potential chain of cascades starting with the initiating event(s) and ending with some final condition(s). However, this is a difficult task and heuristic approaches and approximations have been suggested. This paper discusses different approaches to this and suggests directions for future development of methodologies. The second paper summarizes the state of the art in modeling tools for risk assessment of cascading outages.

  9. Process Equipment Cost Estimation, Final Report

    Office of Scientific and Technical Information (OSTI)

    Process Equipment Cost Estimation Final Report January 2002 H.P. Loh U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940, 626 Cochrans Mill Road Pittsburgh, PA 15236-0940 and P.O. Box 880, 3610 Collins Ferry Road Morgantown, WV 26507-0880 and Jennifer Lyons and Charles W. White, III EG&G Technical Services, Inc. 3604 Collins Ferry Road, Suite 200 Morgantown, WV 26505 DOE/NETL-2002/1169 ii Disclaimer This report was prepared as an account of work sponsored by an

  10. Advanced Manufacturing Office Peer Review Final Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ADVANCED MANUFACTURING OFFICE PEER REVIEW MAY 28-29, 2015 Washington Marriott Wardman Park 2660 Woodley Road NW Washington, DC 20008 FINAL AGENDA Day 1 (May 28) 8:00 - 8:45 am Peer Reviewer Briefing Breakfast Mark Johnson, Isaac Chan, Mark Shuart, and Jay Wrobel, DOE-AMO 8:45 - 9:00 am BREAK 8:00 - 9:00 am REGISTRATION FOR ATTENDEES 9:00 - 9:30 am Welcome and AMO Overview Mark Johnson, DOE-AMO 9:30 - 9:50 am Sustainable Manufacturing via Multi-Scale Third Wave Systems Inc. Physics-Based Process

  11. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    0 Structural and Geographic Characteristics of Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East South Central Census Division",,,"West South Central Census Division" ,,,,,,,,,"Total East South Central",,,"Total West South Central" ,"Total U.S.1 (millions)",,"Total South Atlantic" "Structural

  12. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    1 Structural and Geographic Characteristics of Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,,,,,"Pacific Census Division" ,,,,"Mountain North Sub-Division",,,"Mountain South Sub-Division" ,"Total U.S.1 (millions)",,,"Total Mountain North",,,"Total Mountain South" "Structural and Geographic

  13. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    1 Appliances in Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,,,,,"Pacific Census Division" ,,,,"Mountain North Sub-Division",,,"Mountain South Sub-Division" ,"Total U.S.1 (millions)",,,"Total Mountain North",,,"Total Mountain South" ,,"Total West","Total Mountain",,,"ID, MT, UT,

  14. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    0 Appliances in Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East South Central Census Division",,,"West South Central Census Division" ,,,,,,,,,"Total East South Central",,,"Total West South Central" ,"Total U.S.1 (millions)",,"Total South Atlantic" ,,"Total South",,,,,"DC, DE, MD,

  15. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    2 Structural and Geographic Characteristics of U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,,,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes" ,"Total U.S.1 (millions)" "Structural and Geographic

  16. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    4 Structural and Geographic Characteristics of U.S. Homes, by Number of Household Members, 2009" " Million Housing Units, Final" ,,"Number of Household Members" ,"Total U.S.1 (millions)" "Structural and Geographic Characteristics",,,,,,"5 or More Members" ,,"1 Member","2 Members","3 Members","4 Members" "Total Homes",113.6,31.3,35.8,18.1,15.7,12.7 "Census Region and Division"

  17. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    8 Structural and Geographic Characteristics of Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census Division",,,"Middle Atlantic Census Division" ,"Total U.S.1 (millions)",,"Total New England",,,"Total Middle Atlantic" "Structural and Geographic Characteristics",,"Total Northeast",,,"CT, ME, NH, RI, VT"

  18. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    9 Structural and Geographic Characteristics of Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census Division",,,,,"West North Central Census Division" ,,,"Total East North Central",,,,,"Total West North Central" ,"Total U.S.1 (millions)" "Structural and Geographic Characteristics",,"Total Midwest",,,,," IN,

  19. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    Appliances in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,,,,,"5 or More Units","Mobile Homes" "Appliances",,"Detached","Attached","2 to 4 Units" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Cooking Appliances" "Stoves (Units With

  20. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    9 Appliances in Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census Division",,,,,"West North Central Census Division" ,,,"Total East North Central",,,,,"Total West North Central" ,"Total U.S.1 (millions)" ,,"Total Midwest",,,,," IN, OH",,,"IA, MN, ND, SD"

  1. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Structural and Geographic Characteristics of U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" "Structural and Geographic Characteristics",,"Before 1940","1940 to 1949","1950 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999","2000 to 2009" "Total

  2. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Structural and Geographic Characteristics of U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" "Structural and Geographic Characteristics",,"Very Cold/","Mixed- Humid","Mixed-Dry/" ,,"Cold",,"Hot-Dry","Hot-Humid","Marine" "Total Homes",113.6,38.8,35.4,14.1,19.1,6.3 "Census Region and Division"

  3. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    7 Structural and Geographic Characteristics of U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" "Structural and Geographic Characteristics",,"Northeast","Midwest","South","West" "Total Homes",113.6,20.8,25.9,42.1,24.8 "Urban and Rural2" "Urban",88.1,18,19.9,28.6,21.5 "Rural",25.5,2.8,6,13.4,3.3

  4. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    4 Appliances in U.S. Homes, by Number of Household Members, 2009" " Million Housing Units, Final" ,,"Number of Household Members" ,"Total U.S.1 (millions)" ,,,,,,"5 or More Members" "Appliances",,"1 Member","2 Members","3 Members","4 Members" "Total Homes",113.6,31.3,35.8,18.1,15.7,12.7 "Cooking Appliances" "Stoves (Units With Both" "an Oven and a Cooktop)"

  5. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Appliances in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold/","Mixed- Humid","Mixed-Dry/" "Appliances",,"Cold",,"Hot-Dry","Hot-Humid","Marine" "Total Homes",113.6,38.8,35.4,14.1,19.1,6.3 "Cooking Appliances" "Stoves (Units With Both" "an Oven and a Cooktop)"

  6. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    7 Appliances in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,"Total U.S.1 (millions)","Census Region" "Appliances",,"Northeast","Midwest","South","West" "Total Homes",113.6,20.8,25.9,42.1,24.8 "Cooking Appliances" "Stoves (Units With Both" "an Oven and a Cooktop)" "Use a Stove",102.3,19.2,23.9,38.2,20.9

  7. Final Report: Performance Engineering Research Institute

    SciTech Connect (OSTI)

    Mellor-Crummey, John

    2014-10-27

    This document is a final report about the work performed for cooperative agreement DE-FC02-06ER25764, the Rice University effort of Performance Engineering Research Institute (PERI). PERI was an Enabling Technologies Institute of the Scientific Discovery through Advanced Computing (SciDAC-2) program supported by the Department of Energy's Office of Science Advanced Scientific Computing Research (ASCR) program. The PERI effort at Rice University focused on (1) research and development of tools for measurement and analysis of application program performance, and (2) engagement with SciDAC-2 application teams.

  8. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    Air Conditioning in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Air Conditioning" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Air Conditioning Equipment"

  9. 1990 Weatherization Assistance Program monitoring. Final report

    SciTech Connect (OSTI)

    Samuels, L.S.

    1992-06-19

    The fiscal year 1990 DOE weatherization programs were monitored in Indiana, Ohio, and Wisconsin. The focus of the monitoring was on a total of 18 subgrantees. Separate reports on the monitoring completed on each site was submitted as well as the final summary report for each state. The scope of monitoring consisted of a review of current contracts, budgets, program operating procedures, staffing, inventory control, financial and procurement procedures, review of client files and audit reports, inspection of completed dwelling units and assessment of monitoring, training, and technical assistance provided by the grantees. A random sampling of completed units were selected and visits were made to inspect these weatherized dwellings.

  10. ATAC Process Proof of Concept Final Report

    SciTech Connect (OSTI)

    Bri Rolston; Sarah Freeman

    2014-03-01

    Researchers at INL with funding from the Department of Energy’s Office of Electricity Delivery and Energy Reliability (DOE-OE) evaluated a novel approach for near real-time consumption of threat intelligence. Demonstration testing in an industry environment supported the development of this new process to assist the electric sector in securing their critical networks. This report provides the reader with an understanding of the methods used during this proof of concept project. The processes and templates were further advanced with an industry partner during an onsite assessment. This report concludes with lessons learned and a roadmap for final development of these materials for use by industry.

  11. Cell Total Activity Final Estimate.xls

    Office of Legacy Management (LM)

    WSSRAP Cell Total Activity Final Estimate (calculated September 2002, Fleming) (Waste streams & occupied cell volumes from spreadsheet titled "cell waste volumes-8.23.02 with macros.xls") Waste Stream a Volume (cy) Mass (g) 2 Radiological Profile 3 Nuclide Activity (Ci) 4 Total % of Total U-238 U-234 U-235 Th-228 Th-230 Th-232 Ra-226 Ra-228 Rn-222 5 Activity if > 1% Raffinate Pits Work Zone (Ci) Raffinate processed through CSS Plant 1 159990 1.49E+11 Raffinate 6.12E+01 6.12E+01

  12. Barwood CNG Cab Fleet Study: Final Results

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Barwood CNG Cab Fleet Study Final Results May 1999 * NREL/ TP-540-26035 Peg Whalen, Ken Kelly, and Mardi John National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute * * * * Battelle * * * * Bechtel Contract No. DE-AC36-99-GO10337 National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest

  13. Final Technical Report: Increasing Prediction Accuracy.

    SciTech Connect (OSTI)

    King, Bruce Hardison; Hansen, Clifford; Stein, Joshua

    2015-12-01

    PV performance models are used to quantify the value of PV plants in a given location. They combine the performance characteristics of the system, the measured or predicted irradiance and weather at a site, and the system configuration and design into a prediction of the amount of energy that will be produced by a PV system. These predictions must be as accurate as possible in order for finance charges to be minimized. Higher accuracy equals lower project risk. The Increasing Prediction Accuracy project at Sandia focuses on quantifying and reducing uncertainties in PV system performance models.

  14. EnergyTodayIssuesFinal4.indd

    Office of Environmental Management (EM)

    1, First Quarter * Page 1 w w w . f o s s i l . e n e r g y . g o v / n e w s / e n e r g y t o d a y . h t m l CONTENTS  ■ High Speed Imaging ...................... 1  ■ Welcome to Fossil Energy Today .. 1  ■ Carbon Sequestration Atlas ........... 3  ■ Coal-Fired Project of the Year ....... 3  ■ Risk Assessment ........................... 4  ■ RMOTC ......................................... 4  ■ FE Spotlight ................................... 5  ■ Recent

  15. Energy Impact Illinois - Final Technical Report

    SciTech Connect (OSTI)

    Olson, Daniel; Plagman, Emily; Silberhorn, Joey-Lin

    2014-02-18

    Energy Impact Illinois (EI2) is an alliance of government organizations, nonprofits, and regional utility companies led by the Chicago Metropolitan Agency for Planning (CMAP) that is dedicated to helping communities in the Chicago metropolitan area become more energy efficient. Originally organized as the Chicago Region Retrofit Ramp-Up (CR3), EI2 became part of the nationwide Better Buildings Neighborhood Program (BBNP) in May 2010 after receiving a $25 million award from the U.S. Department of Energy (DOE) authorized through the American Recovery and Reinvestment Act of 2009 (ARRA). The program’s primary goal was to fund initiatives that mitigate barriers to energy efficiency retrofitting activities across residential, multifamily, and commercial building sectors in the seven-county CMAP region and to help to build a sustainable energy efficiency marketplace. The EI2 Final Technical Report provides a detailed review of the strategies, implementation methods, challenges, lessons learned, and final results of the EI2 program during the initial grant period from 2010-2013. During the program period, EI2 successfully increased direct retrofit activity in the region and was able to make a broader impact on the energy efficiency market in the Chicago region. As the period of performance for the initial grant comes to an end, EI2’s legacy raises the bar for the region in terms of helping homeowners and building owners to take action on the continually complex issue of energy efficiency.

  16. Hydrothermal reaction of fly ash. Final report

    SciTech Connect (OSTI)

    Brown, P.W.

    1994-12-31

    The reactions which occur when fly ash is treated under hydrothermal conditions were investigated. This was done for the following primary reasons. The first of these is to determine the nature of the phases that form to assess the stabilities of these phases in the ambient environment and, finally, to assess whether these phases are capable of sequestering hazardous species. The second reason for undertaking this study was whether, depending on the composition of the ash and the presence of selected additives, it would be possible under hydrothermal conditions to form compounds which have cementitious properties. Formation of four classes of compounds, which bracket likely fly ash compositional ranges, were selected for study. The classes are calcium silicate hydrates, calcium selenates, and calcium aluminosulfates, and silicate-based glasses. Specific compounds synthesized were determined and their stability regions assessed. As part of stability assessment, the extent to which selected hazardous species are sequestered was determined. Finally, the cementing properties of these compounds were established. The results obtained in this program have demonstrated that mild hydrothermal conditions can be employed to improve the reactivity of fly ash. Such improvements in reactivity can result in the formation of monolithic forms which may exhibit suitable mechanical properties for selected applications as building materials. If the ashes involved are considered hazardous, the mechanical properties exhibited indicated the forms could be handled in a manner which facilitates their disposal.

  17. D:\0myfiles\DOE Policy (LBL) Blackout Final\final-blackout-body-xx.vp

    Office of Environmental Management (EM)

    Canada Power System Outage Task Force Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations April 2004 U.S.-Canada Power System Outage Task Force Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations April 2004 ii G U.S.-Canada Power System Outage Task Force G August 14th Blackout: Causes and Recommendations G U.S.-Canada Power System Outage Task Force March 31, 2004 Dear Mr. President and Prime

  18. Air Risk Information Support Center

    SciTech Connect (OSTI)

    Shoaf, C.R.; Guth, D.J.

    1990-12-31

    The Air Risk Information Support Center (Air RISC) was initiated in early 1988 by the US Environmental Protection Agency`s (EPA) Office of Health and Environmental Assessment (OHEA) and the Office of Air Quality Planning and Standards (OAQPS) as a technology transfer effort that would focus on providing information to state and local environmental agencies and to EPA Regional Offices in the areas of health, risk, and exposure assessment for toxic air pollutants. Technical information is fostered and disseminated by Air RISCs three primary activities: (1) a {open_quotes}hotline{close_quotes}, (2) quick turn-around technical assistance projects, and (3) general technical guidance projects. 1 ref., 2 figs.

  19. Initial Decision and Risk Analysis

    SciTech Connect (OSTI)

    Engel, David W.

    2012-02-29

    Decision and Risk Analysis capabilities will be developed for industry consideration and possible adoption within Year 1. These tools will provide a methodology for merging qualitative ranking of technology maturity and acknowledged risk contributors with quantitative metrics that drive investment decision processes. Methods and tools will be initially introduced as applications to the A650.1 case study, but modular spreadsheets and analysis routines will be offered to industry collaborators as soon as possible to stimulate user feedback and co-development opportunities.

  20. EA-1665: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV...

  1. LLNL Final Design for PDV Measurements of Godiva for Validation...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: LLNL Final Design for PDV Measurements of Godiva for Validation of Multi-Physics Simulation Citation Details In-Document Search Title: LLNL Final Design for PDV...

  2. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure...

    Energy Savers [EERE]

    Final Rule for Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Residential Furnace Fan Test Procedure January 3, 2014 - 12:00am Addthis The Department of Energy ...

  3. LLNL Final Design for PDV Measurements of Godiva for Validation...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: LLNL Final Design for PDV Measurements of Godiva for Validation of Multi-Physics Simulation Citation Details In-Document Search Title: LLNL Final Design for PDV ...

  4. Work Group Telecon (Final Charters) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Telecon (Final Charters) Work Group Telecon (Final Charters) Meeting Date: April 24, 2012 Documents Available for Download PDF icon Meeting Agenda More Documents & Publications Work Group Telecom (Draft Charters

  5. Microsoft PowerPoint - 05 Okonski final Project Management Workshop...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Okonski final Project Management Workshop Slides O'Konski Microsoft PowerPoint - 05 Okonski final Project Management Workshop Slides O'Konski PDF icon Microsoft PowerPoint - 05...

  6. Final Discussion | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Detector RD PI Meeting files Final Discussion Print Text Size: A A A FeedbackShare Page Final Discussion Session (Borland) .pdf file (130KB) Last modified: 3182013 10:23:38...

  7. Y-12 Final Site-Wide Environmental Impact Statement Approved...

    National Nuclear Security Administration (NNSA)

    Blog Home Field Offices Welcome to the NNSA Production Office NPO News Releases Y-12 Final Site-Wide Environmental Impact Statement Approved Y-12 Final Site-Wide...

  8. Microsoft Word - FINAL_Apr07HAB_Summary.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FINAL Meeting Summary April 5 - 6, 2007 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD April 5 - 6, 2007 Clackamas, OR Topics in This Meeting Summary Executive Summary........................................................................................................................................ 1 Welcome and Introductions............................................................................................................................ 3 Approval of November Meeting Summary

  9. Final Technical Report (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Final Technical Report Citation Details In-Document Search Title: Final Technical Report You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This ...

  10. Oct 2009 final concurrence letter for BPA | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oct 2009 final concurrence letter for BPA Oct 2009 final concurrence letter for BPA This is in reference to the letter dated January 15,2009, fiom your predecessor, Honorable...

  11. Overview of the Hanford risk management plan

    SciTech Connect (OSTI)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  12. Portsmouth Site Treatment Plan Director's Final Findings and Orders |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Treatment Plan Director's Final Findings and Orders Portsmouth Site Treatment Plan Director's Final Findings and Orders Portsmouth Site Treatment Plan Director's Final Findings and Orders is an agreement between the Ohio EPA and DOE approving the Site Treatment Plan and setting forth guidelines for storage and treatment of mixed wastes at the Portsmouth Facility. PDF icon Portsmouth Site Treatment Plan Director's Final Findings and Order - 1995 More Documents &

  13. Final Information Quality Bulletin for Peer Review | Department of Energy

    Energy Savers [EERE]

    Final Information Quality Bulletin for Peer Review Final Information Quality Bulletin for Peer Review Final Information Quality Bulletin for Peer Review PDF icon Final Information Quality Bulletin for Peer Review More Documents & Publications The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, July 1 2011, Volume 2 No. 3 The American Recovery and Reinvestment Act (ARRA) Energy Assurance Planning (EAP) Bulletin, January 3 2012, Volume 3 No. 1 The

  14. EIS-0499: EPA Notice of Availability of Final Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0499: EPA Notice of Availability of Final Environmental Impact Statement Great Northern Transmission Line Project, Minnesota EPA announced the availability of the Final Environmental Impact Statement for the Great Northern Transmission Line Project. The Final EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct,

  15. Seneca Nation of Indians Strategic Energy Resource Planning Final Report

    SciTech Connect (OSTI)

    Gina Paradis

    2006-01-17

    Final report for the First Steps Toward Developing Renewable Energy and Energy Efficiency on Tribal Lands grants.

  16. Agencies Publish Final Environmental Impact Statement on Energy Corridor

    Energy Savers [EERE]

    Designation in the West | Department of Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 4:58pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The

  17. Federal Register Notice, CBDPP Final Rule | Department of Energy

    Energy Savers [EERE]

    Federal Register Notice, CBDPP Final Rule Federal Register Notice, CBDPP Final Rule December 8, 1999 Federal Register Notice, Final rule for 10 CFR part 850, CBDPP The Department of Energy (DOE) published a final rule to establish a chronic beryllium disease prevention program (CBDPP) to reduce the number of workers currently exposed to beryllium in the course of their work at DOE facilities managed by DOE or its contractors, minimize the levels of, and potential for, exposure to beryllium, and

  18. Process Evaluation of the Better Buildings Neighborhood Program, Final

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation Volume 4 | Department of Energy Process Evaluation of the Better Buildings Neighborhood Program, Final Evaluation Volume 4 Process Evaluation of the Better Buildings Neighborhood Program, Final Evaluation Volume 4 Final Report: Process Evaluation of the Better Buildings Neighborhood Program, Final Evaluation Volume 4, American Recovery and Reinvestment Act of 2009, June 2015. Prepared for U.S. Department of Energy Office of Energy Efficiency and Renewable Energy. PDF icon Process

  19. EA-1946: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Assessment EA-1946: Final Environmental Assessment Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon Bonneville Power Administration (BPA) issued a Final EA that assesses the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. The Final EA consists of comments received on the draft EA and responses to the

  20. EA-1950: Final Environmental Assessement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Assessement EA-1950: Final Environmental Assessement Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington Bonneville Power Administration issued a final EA that evaluates potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington. The final EA consists of the draft EA and a document that

  1. EA-1975: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Assessment EA-1975: Final Environmental Assessment Linac Coherent Light Source-IL, SLAC National Accelerator Laboratory, Menlo Park, California DOE issued a Final EA on the potential environmental impacts of a proposal to upgrade the existing LINAC Coherent Light Source (LCLS) at the SLAC National Accelerator Laboratory. PDF icon EA-1975-FEA-2014.pdf More Documents & Publications EA-1975: Draft Environmental Assessment EA-1904: Final Environmental Assessment EA-1975:

  2. EIS-0162: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    2: Final Environmental Impact Statement EIS-0162: Final Environmental Impact Statement Bonneville Power Administration (BPA) Resource Programs PDF icon EIS-0162-FEIS-Summary.pdf PDF icon EIS-0162-FEIS-Volume_1.pdf PDF icon EIS-0162-FEIS-Volume_2_Addendum_Appendices.pdf PDF icon EIS-0162-FEIS-Volume_3.pdf More Documents & Publications EIS-0145: Final Environmental Impact Statement EIS-0201: Final Environmental Impact Statement EIS-017

  3. EIS-0251: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0251: Final Environmental Impact Statement Department of the Navy Final Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel (November 1996) This Final Environmental Impact Statement addresses six general alternative systems for the loading, storage, transport, and possible disposal of naval spent nuclear fuel following examination. PDF icon EIS-0251-FEIS-1996.pdf More Documents & Publications EIS-0251:

  4. EIS-0288-S1: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Final Supplemental Environmental Impact Statement EIS-0288-S1: Final Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Final Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor (DOE/EIS-0288-S1) supplements DOE's 1999 Final EIS (DOE/EIS-0288), which addressed the production of tritium in Tennessee Valley Authority (TVA) reactors at Watts Bar Unit 1 in Rhea County, TN,

  5. EIS-0290: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0290: Final Environmental Impact Statement Advanced Mixed Waste Treatment Project (AMWTP) The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the Idaho National Environmental and Engineering Laboratory (INEEL). PDF icon Advanced Mixed Waste Treatment Project (AMWTP) Final Environmental Impact Statement, DOE/EIS-0290 (January 1999)

  6. EIS-0417: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    7: Final Environmental Impact Statement EIS-0417: Final Environmental Impact Statement South Mountain Freeway (Loop 202); Phoenix, Arizona The Federal Highway Administration and the Arizona Department of Transportation issued a Final EIS that evaluates the potential environmental impacts of a proposed new multi-lane freeway in the metropolitan Phoenix area. DOE's Western Area Power Administration, a cooperating agency, would move or reconfigure several transmission line towers. The Final EIS is

  7. Microsoft Word - 1 Million Electric Vehicle Report Final | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 1 Million Electric Vehicle Report Final Microsoft Word - 1 Million Electric Vehicle Report Final PDF icon Microsoft Word - 1 Million Electric Vehicle Report Final More Documents & Publications FY 2012 Annual Progress Report for Energy Storage R&D Revolution Now: The Future Arrives for Five Clean Energy Technologies-2015 Update Hybrid Electric Systems

  8. Acqguide18pt0 March 2011 final | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acqguide18pt0 March 2011 final Acqguide18pt0 March 2011 final Emergency Acquisitions PDF icon Acqguide18pt0 March 2011 final More Documents & Publications Chapter 18 - Emergency Acquisitions OPAM Policy Acquisition Guides Microsoft Word - acqguide18pt0

  9. DOE_Technology_TF_Final-Jun.pdf | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE_Technology_TF_Final-Jun.pdf DOE_Technology_TF_Final-Jun.pdf PDF icon DOE_Technology_TF_Final-Jun.pdf More Documents & Publications 1703 Process Letter QER - Comment of Canadian Hydropower Association Behavioral Opportunities for Energy Savings in Office Buildings: a London Field Experiment

  10. Final Discussion | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Final Discussion Scientific User Facilities (SUF) Division SUF Home About User Facilities Projects Accelerator & Detector Research Science Highlights Principal Investigators' Meetings BES Home 2011 Accelerator Detector RD PI Meeting files Final Discussion Print Text Size: A A A FeedbackShare Page Final Discussion Session (Borland) .pdf file (130KB) Last modified: 3/18/2013 10:23:38

  11. PI Brief 6 15 07 final2 | Department of Energy

    Energy Savers [EERE]

    PI Brief 6 15 07 final2&#0; PI Brief 6 15 07 final2&#0; PDF icon PI Brief 6 15 07 final2&#0; More Documents & Publications POLICY FLASH 2016-04 Procurement Integrity AcqGuide3pt1.doc&#0;

  12. REEE Solicitation Fact Sheet FINAL | Department of Energy

    Energy Savers [EERE]

    Fact Sheet FINAL REEE Solicitation Fact Sheet FINAL PDF icon REEE Solicitation Fact Sheet FINAL.pdf More Documents & Publications Draft Renewable Energy and Efficient Energy Projects Solicitation Fact Sheet DOE-LPO_Email-Update_001_Through_11 REEE Solicitation Public Meeting Presentation

  13. FINAL SBIR-STTR Awards 112309.xlsx | Department of Energy

    Office of Environmental Management (EM)

    FINAL SBIR-STTR Awards 112309.xlsx FINAL SBIR-STTR Awards 112309.xlsx PDF icon FINAL SBIR-STTR Awards 112309.xlsx More Documents & Publications Massachusetts Recovery Act State Memo NEUP Project Selections_September212011_IRP and Infrastructure Improvements California Recovery Act State Memo

  14. Comment Listing Response to Draft REEE Solicitation FINAL | Department of

    Office of Environmental Management (EM)

    Energy Comment Listing Response to Draft REEE Solicitation FINAL Comment Listing Response to Draft REEE Solicitation FINAL PDF icon Comment ListingResponse_REEE Solicitation_final.pdf More Documents & Publications Draft Advanced Fossil Energy Projects Solicitation Public Comments Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation DOE-LPO_Email-Update_001_Through_11

  15. NEI Statement DOE Workshop 02 20 FINAL | Department of Energy

    Office of Environmental Management (EM)

    Statement DOE Workshop 02 20 FINAL NEI Statement DOE Workshop 02 20 FINAL PDF icon NEI Statement DOE Workshop 02 20 FINAL More Documents & Publications NOPR NEI NEI Request for Extension of Public Comment Period DOE-HQ-201.... NOPR Marsh

  16. Microsoft PowerPoint - Final translated version of Tsinghua Speech |

    Office of Environmental Management (EM)

    Department of Energy Final translated version of Tsinghua Speech Microsoft PowerPoint - Final translated version of Tsinghua Speech PDF icon Microsoft PowerPoint - Final translated version of Tsinghua Speech More Documents & Publications Heating Ventilation and Air Conditioning Efficiency GNEP Element:Expand Domestic Use of Nuclear Power Greenpower Trap Mufflerl System

  17. Microsoft Word - 564M_Biomass_Project Descriptions FINAL 120409 |

    Office of Environmental Management (EM)

    Department of Energy 564M_Biomass_Project Descriptions FINAL 120409 Microsoft Word - 564M_Biomass_Project Descriptions FINAL 120409 PDF icon Microsoft Word - 564M_Biomass_Project Descriptions FINAL 120409 More Documents & Publications 564M_Biomass_Projects.pdf Microsoft Word - 338M_Geothermal_Project_Descriptions ARRA Projects Chart

  18. Microsoft Word - CERFDOE Final Report - 071204.doc | Department of Energy

    Office of Environmental Management (EM)

    CERFDOE Final Report - 071204.doc Microsoft Word - CERFDOE Final Report - 071204.doc PDF icon Microsoft Word - CERFDOE Final Report - 071204.doc More Documents & Publications Integrated Project Team RM DOE EIR FM.doc Independent Oversight Activity Report, Hanford Sludge Treatment Project - September 2013

  19. Microsoft Word - Final Sample Participant Profile November 2008.doc |

    Office of Environmental Management (EM)

    Department of Energy Final Sample Participant Profile November 2008.doc Microsoft Word - Final Sample Participant Profile November 2008.doc More Documents & Publications Microsoft Word - ARRAAttachment12v1.doc Microsoft Word - Fact Sheet Energy Speech 082508 FINAL.doc Microsoft Word - DRAFT CRB Interview Guidance

  20. EA-1846: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    6: Final Environmental Assessment EA-1846: Final Environmental Assessment Demonstration of Carbon Dioxide Capture and Sequestration of Steam Methane Reforming Process Gas Used for Large-Scale Hydrogen Production, Jefferson and Brazoria Counties, Texas PDF icon EA-1846-FEA-2011.pdf More Documents & Publications EIS-0464: Draft Environmental Impact Statement EIS-0464: Final Environmental Impact Statement EIS-0464: Record of Decision

  1. EA-1941: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Assessment EA-1941: Final Environmental Assessment BPA issued a Final EA to assess the potential environmental impacts of proposed improvements to 13 miles of access roads for its existing 115-kV Boyer-Tillamook No. 1 Transmission Line. PDF icon EA-1941-FEA-2014.pdf More Documents & Publications EA-1941: Finding of No Significant Impact (FONSI)

  2. EIS-0129: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    9: Final Environmental Impact Statement EIS-0129: Final Environmental Impact Statement New England/Hydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-FEIS.pdf PDF icon EIS-0129-FEIS-Addendum.pdf More Documents & Publications EIS-0007: Draft Environmental Impact Statement EIS-0125: Final Environmental Impact Statement EIS-0129: Draft

  3. EIS-0464: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0464: Final Environmental Impact Statement Lake Charles Carbon capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This Final Environmental Impact Statement provides information about the potential environmental impacts associated with the Department of Energy's proposed action to provide financial assistance to Leucadia Energy, LLC (Leucadia) and with Leucadia's proposed Lake Charles Carbon Capture and Sequestration

  4. Final Technical Progress Report NANOSTRUCTURED MAGNETIC MATERIALS

    SciTech Connect (OSTI)

    Charles M. Falco

    2012-09-13

    This report describes progress made during the final phase of our DOE-funded program on Nanostructured Magnetic Materials. This period was quite productive, resulting in the submission of three papers and presentation of three talks at international conferences and three seminars at research institutions. Our DOE-funded research efforts were directed toward studies of magnetism at surfaces and interfaces in high-quality, well-characterized materials prepared by Molecular Beam Epitaxy (MBE) and sputtering. We have an exceptionally well-equipped laboratory for these studies, with: Thin film preparation equipment; Characterization equipment; Equipment to study magnetic properties of surfaces and ultra-thin magnetic films and interfaces in multi-layers and superlattices.

  5. RESEM-CA Final Project Report

    SciTech Connect (OSTI)

    Carroll, William

    2004-06-01

    This document is the final deliverable for Project 2.2-Retrofit Tools, in the California Energy Commission Public Interest Energy Research Program for High Performance Commercial Building Systems (PIER-HPCBS). The objective of Project 2.2 is to deliver an updated and California-Customized retrofit analysis tool based on the earlier federally funded RESEM (Retrofit Energy Savings Estimation Method) tool [1]. Specific tasks to accomplish this were identified in PIER HPCBS Report No. E2P2.2T1c, and addressed (a) modernization, (b) enhancement of basic analysis methods and capabilities, (c) adding, modifying, or updating databases for California building types, systems, components, utility rate structures, and weather.

  6. Neurons to algorithms LDRD final report.

    SciTech Connect (OSTI)

    Rothganger, Fredrick H.; Aimone, James Bradley; Warrender, Christina E.; Trumbo, Derek

    2013-09-01

    Over the last three years the Neurons to Algorithms (N2A) LDRD project teams has built infrastructure to discover computational structures in the brain. This consists of a modeling language, a tool that enables model development and simulation in that language, and initial connections with the Neuroinformatics community, a group working toward similar goals. The approach of N2A is to express large complex systems like the brain as populations of a discrete part types that have specific structural relationships with each other, along with internal and structural dynamics. Such an evolving mathematical system may be able to capture the essence of neural processing, and ultimately of thought itself. This final report is a cover for the actual products of the project: the N2A Language Specification, the N2A Application, and a journal paper summarizing our methods.

  7. Clean Energy Works Oregon Final Technical Report

    SciTech Connect (OSTI)

    Jacob, Andria; Cyr, Shirley

    2013-12-31

    In April 2010, the City of Portland received a $20 million award from the U.S. Department of Energy, as part of the Energy Efficiency and Conservation Block Grant program. This award was appropriated under the American Recovery and Reinvestment Act (ARRA), passed by President Obama in 2009. DOE’s program became known as the Better Buildings Neighborhood Program (BBNP). The BBNP grant objectives directed the City of Portland Bureau of Planning and Sustainability (BPS) as the primary grantee to expand the BPS-led pilot program, Clean Energy Works Portland, into Clean Energy Works Oregon (CEWO), with the mission to deliver thousands of home energy retrofits, create jobs, save energy and reduce carbon dioxide emissions.The Final Technical Report explores the successes and lessons learned from the first 3 years of program implementation.

  8. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Appliances in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to 1949","1950 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999","2000 to 2009" "Appliances" "Total Homes",113.6,14.4,5.2,13.5,13.3,18.3,17,16.4,15.6 "Cooking Appliances"

  9. Revised Final DOE10-7-13

    SciTech Connect (OSTI)

    Gilbreath, Bob; Maples, Manuel G

    2013-10-07

    The project goal was reduction of energy consumption on a group of multi-use buildings. The initial step was to assess the group of buildings and define a set of Energy Conservation Measures (ECM?s) that would return an average energy consumption savings of thirty percent. The assessments defined deficiencies in systems from building envelope to interior lighting. Corrections for the deficiencies were addressed through ECM?s that included: high efficiency lighting, occupancy sensors, programmable thermostats, HVAC upgrades, insulation upgrades, as well as a solar thermal installation to reduce propane consumption. ECM?s were recommended based on calculated energy savings. ECM implementation was performed using licensed professionals across multiple disciplines. Electricians installed new lighting and set up occupancy sensors while plumbers implemented low flow fixtures and insulated water heater systems. A general contractor sealed and repaired building envelopes while overseeing other disciplines. Final energy consumption reductions will exceed thirty percent across nine buildings

  10. Final Report: Correctness Tools for Petascale Computing

    SciTech Connect (OSTI)

    Mellor-Crummey, John

    2014-10-27

    In the course of developing parallel programs for leadership computing systems, subtle programming errors often arise that are extremely difficult to diagnose without tools. To meet this challenge, University of Maryland, the University of Wisconsin—Madison, and Rice University worked to develop lightweight tools to help code developers pinpoint a variety of program correctness errors that plague parallel scientific codes. The aim of this project was to develop software tools that help diagnose program errors including memory leaks, memory access errors, round-off errors, and data races. Research at Rice University focused on developing algorithms and data structures to support efficient monitoring of multithreaded programs for memory access errors and data races. This is a final report about research and development work at Rice University as part of this project.

  11. Analyses in support of risk-informed natural gas vehicle maintenance facility codes and standards :

    SciTech Connect (OSTI)

    Ekoto, Isaac W.; Blaylock, Myra L.; LaFleur, Angela Christine; LaChance, Jeffrey L.; Horne, Douglas B.

    2014-03-01

    Safety standards development for maintenance facilities of liquid and compressed gas fueled large-scale vehicles is required to ensure proper facility design and operation envelopes. Standard development organizations are utilizing risk-informed concepts to develop natural gas vehicle (NGV) codes and standards so that maintenance facilities meet acceptable risk levels. The present report summarizes Phase I work for existing NGV repair facility code requirements and highlights inconsistencies that need quantitative analysis into their effectiveness. A Hazardous and Operability study was performed to identify key scenarios of interest. Finally, scenario analyses were performed using detailed simulations and modeling to estimate the overpressure hazards from HAZOP defined scenarios. The results from Phase I will be used to identify significant risk contributors at NGV maintenance facilities, and are expected to form the basis for follow-on quantitative risk analysis work to address specific code requirements and identify effective accident prevention and mitigation strategies.

  12. Scientific basis for risk assessment and management of uranium mill tailings

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    A National Research Council study panel, convened by the Board on Radioactive Waste Management, has examined the scientific basis for risk assessment and management of uranium mill tailings and issued this final report containing a number of recommendations. Chapter 1 provides a brief introduction to the problem. Chapter 2 examines the processes of uranium extraction and the mechanisms by which radionuclides and toxic chemicals contained in the ore can enter the environment. Chapter 3 is devoted to a review of the evidence on health risks associated with radon and its decay products. Chapter 4 provides a consideration of conventional and possible new technical alternatives for tailings management. Chapter 5 explores a number of issues of comparative risk, provides a brief history of uranium mill tailings regulation, and concludes with a discussion of choices that must be made in mill tailing risk management. 211 refs., 30 figs., 27 tabs.

  13. Spacecraft fabrication and test MODIL. Final report

    SciTech Connect (OSTI)

    Saito, T.T.

    1994-05-01

    This report covers the period from October 1992 through the close of the project. FY 92 closed out with the successful briefing to industry and with many potential and important initiatives in the spacecraft arena. Due to the funding uncertainties, we were directed to proceed as if our funding would be approximately the same as FY 92 ($2M), but not to make any major new commitments. However, the MODIL`s FY 93 funding was reduced to $810K and we were directed to concentrate on the cryocooler area. The cryocooler effort completed its demonstration project. The final meetings with the cryocooler fabricators were very encouraging as we witnessed the enthusiastic reception of technology to help them reduce fabrication uncertainties. Support of the USAF Phillips Laboratory cryocooler program was continued including kick-off meetings for the Prototype Spacecraft Cryocooler (PSC). Under Phillips Laboratory support, Gill Cruz visited British Aerospace and Lucas Aerospace in the United Kingdom to assess their manufacturing capabilities. In the Automated Spacecraft & Assembly Project (ASAP), contracts were pursued for the analysis by four Brilliant Eyes prime contractors to provide a proprietary snap shot of their current status of Integrated Product Development. In the materials and structure thrust the final analysis was completed of the samples made under the contract (``Partial Automation of Matched Metal Net Shape Molding of Continuous Fiber Composites``) to SPARTA. The Precision Technologies thrust funded the Jet Propulsion Laboratory to prepare a plan to develop a Computer Aided Alignment capability to significantly reduce the time for alignment and even possibly provide real time and remote alignment capability of systems in flight.

  14. Conceptual designs for modular OTEC SKSS. Final report

    SciTech Connect (OSTI)

    1980-02-29

    This volume presents the results of the first phase of the Station Keeping Subsystem (SKSS) design study for 40 MW/sub e/ capacity Modular Experiment OTEC Platforms. The objectives of the study were: (1) establishment of basic design requirements; (2) verification of technical feasibility of SKSS designs; (3) identification of merits and demerits; (4) estimates of sizes for major components; (5) estimates of life cycle costs; (6) deployment scenarios and time/cost/risk assessments; (7) maintenance/repair and replacement scenarios; (8) identifications of interface with other OTEC subsystems; (9) recommendations for and major problems in preliminary design; and (10) applicability of concepts to commercial plant SKSS designs. A brief site suitability study was performed with the objective of determining the best possible location at the Punta Tuna (Puerto Rico) site from the standpoint of anchoring. This involved studying the vicinity of the initial location in relation to the prevailing bottom slopes and distances from shore. All subsequent studies were performed for the final selected site. The two baseline OTEC platforms were the APL BARGE and the G and C SPAR. The results of the study are presented in detail. The overall objective of developing two conceptual designs for each of the two baseline OTEC platforms has been accomplished. Specifically: (1) a methodology was developed for conceptual designs and followed to the extent possible. At this stage, a full reliability/performance/optimization analysis based on a probabilistic approach was not used due to the numerous SKSS candidates to be evaluated. A deterministic approach was used. (2) For both of the two baseline platforms, the APL BARGE and the G and C SPAR, all possible SKSS candidate concepts were considered and matrices of SKSS concepts were developed.

  15. Integrated Disposal Facility Risk Assessment

    SciTech Connect (OSTI)

    MANN, F. M.

    2003-06-03

    An environmental risk assessment associated with the disposal of projected Immobilized Low-Activity Waste, solid wastes and failed or decommissioned melters in an Integrated Disposal Facility was performed. Based on the analyses all performance objectives associated with the groundwater, air, and intruder pathways were met.

  16. Final Proposal Supporting Studies (ratecases/WP-02)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19, 2000 Rev. Req't Docu. - Volume 2 WP-02-FS-BPA-02B DOEBP-3284 618 May 19, 2000 RISK ANALYSIS STUDY WP-02-FS-BPA-03 DOEBP-3285 31 May 19, 2000 Risk Documentation...

  17. Mathematical models for risk assessment

    SciTech Connect (OSTI)

    Zaikin, S.A.

    1995-12-01

    The use of mathematical models in risk assessment results in the proper understanding of many aspects of chemical exposure and allows to make more actual decisions. Our project ISCRA (Integrated Systems of Complex Risk Assessment) has the aim to create integrated systems of algorythms for prediction of pollutants` exposure on human and environmental health and to apply them for environmental monitoring, and decision-making. Mathematical model {open_quotes}MASTER{close_quotes} (Mathematical Algorythm of SimulaTion of Environmental Risk) represents the complex of algorythmical blocks and is intended for the prediction of danger of pollutants` exposure for human and environmental risk. Model LIMES (LIMits EStimation) is developed for prognosis of safety concentrations of pollutants in the environment both in the case of isolated exposure and in the case of complex exposure for concrete location. Model QUANT (QUANtity of Toxicant) represents the multicompartmental physiological pharmacokinetic model describing absorption, distribution, fate, metabolism, and elimination of pollutants in the body of different groups of human population, as a result of the different kind of exposure. Decision support system CLEVER (Complex LEVE1 of Risk) predicts the probability and the degree of development of unfavourable effects as result of exposure of pollutant on human health. System is based on the data of epidemiological and experimental researches and includes several mathematical models for analysis of {open_quotes}dose-time-response{close_quotes} relations and information about clinical symptoms of diseases. Model CEP (Combination Effect Prognosis) contains probabilistic algorythms for forecasting the effect of simultaneous impact of several factors polluting the environment. The result of the program work is the prediction of an independent exposure of two or more factors, and intensification or weakening of exposure in depending on factors` interactions.

  18. Risk Assessment of Cascading Outages: Part I - Overview of Methodologies

    SciTech Connect (OSTI)

    Vaiman, Marianna; Bell, Keith; Chen, Yousu; Chowdhury, Badrul; Dobson, Ian; Hines, Paul; Papic, Milorad; Miller, Stephen; Zhang, Pei

    2011-07-31

    This paper is a result of ongoing activity carried out by Understanding, Prediction, Mitigation and Restoration of Cascading Failures Task Force under IEEE Computer Analytical Methods Subcommittee (CAMS). The task force's previous papers are focused on general aspects of cascading outages such as understanding, prediction, prevention and restoration from cascading failures. This is the first of two new papers, which will extend this previous work to summarize the state of the art in cascading failure risk analysis methodologies and modeling tools. This paper is intended to be a reference document to summarize the state of the art in the methodologies for performing risk assessment of cascading outages caused by some initiating event(s). A risk assessment should cover the entire potential chain of cascades starting with the initiating event(s) and ending with some final condition(s). However, this is a difficult task and heuristic approaches and approximations have been suggested. This paper discusses diffeent approaches to this and suggests directions for future development of methodologies.

  19. Solar powered circulation pump development. Final report

    SciTech Connect (OSTI)

    Johnson, A.L.

    1980-09-01

    An iterative design and evaluation process was undertaken to develop a prototype solar powered liquid circulation pump. The first effort was to review the state-of-the-art of liquid piston heat engines. Next a morphological analysis of the original concept was performed. An analysis of the pump performance from a theoretical basis was performed by deriving and solving the equations governing the cycle. The results are documented. An experimental evaluation of the condensing phenomena was performed. The design of the boiler was then undertaken. This effort showed a fundamental physical limitation imposed by the original geometry and the physics of water boiling. In an effort to resolve this problem, a number of alternate configurations were examined, with the result being that the boiler and heat pipe elements of the design were entirely eliminated. In their stead it was assumed that the boiling could be conducted in the solar panel. A number of solar panel designs were examined, and the most appropriate type of solar panel is described in the appendix. A 1/4th scale unit was fabricated and tested. The overall efficiency was approximately 1% at the design point, compared with a theoretical limit of 1.6% for the given operating conditions. The production costs of the full size pump were examined. Finally systems integration aspects were considered and the results presented.

  20. OTEC-1 test operations experience. Final report

    SciTech Connect (OSTI)

    Hoshide, R.K.; Klein, A.; Polino, D.L.; Poucher, F.W.

    1983-07-15

    During Phase III, the complete integrated system was operated, and information was obtained on the performance of the test article, the performance of the seawater and ammonia systems, the operation of the platform and moor systems, the effects of biofouling countermeasures, and the effects of the OTEC cycle on the environment. After several months spent in completing construction of the test system and checking out and repairing the various systems, 4 months of test operations were conducted before funding constraints caused the discontinuation of the test program. Plans were made for long-term storage and/or disposition of the test facility. The OEC test platform is currently located at Pearl Harbor, in the US Navy Inactive Reserve Fleet anchorage. The CWP was placed in underwater storage adjacent to the moor, awaiting a decision on final disposition. In October 1982, the CWP was recovered and custody given to the State of Hawaii. Although the test period lasted only about 4 months, deployment and at-sea operation of a large-scale OTEC plant was demonstrated, and information was obtained towards satisfying each of the objectives of the OTEC-1 project. This document summarizes the OTEC-1 test operations experience, discusses technical lessons learned, and makes recommendations for future OTEC plants.