National Library of Energy BETA

Sample records for finally geo-political risks

  1. International environmental justice: Geo-political implications of the Basel agreement

    SciTech Connect (OSTI)

    Padgett, D.

    1995-12-01

    The 1994 Basel Convention concluded with a historical agreement to immediately ban the export of hazardous wastes for disposal from member countries of the Organization for Economic Co-operation and Development (OECD) to non-OECD nations. The OECD nations account for approximately 98 percent of the world`s toxic waste generation. As of December 31, 1997, exports of wastes for recycling will be illegal. For many years, industrialized nations have shipped hazardous wastes to developing nations under the guise of recycling. The ban will make 90 percent of current shipments unlawful. The United States was among the industrialized OCED nations declining to partake in the agreement. In March 1994, the Waste Export and Import Control Act was introduced to Congress by a concerned coalition of Representatives. The bill would ban all exports of toxic wastes except to those nations. Critics have argued that the nature of the Agreement makes it unenforceable under certain conditions. Applied geographical techniques are employed to reveal regions where the effectiveness of the waste ban may be challenged. Formulas are developed to determine the cost-benefit ratio for non-OECD nations involved in significant levels of toxic waste trade. Political and historical analyses are applied in order to clarify the U.S. opposition to the ban. A list of predictions is offered with the future of hazardous waste transhipments within the context of the world`s ever-changing geo-political sphere. Suggestions for improving the effectiveness and enforceability of the Basel Agreement are offered for discussion.

  2. Cavity degradation risk insurance assessment. Final report

    SciTech Connect (OSTI)

    Hampson, C.; Neill, P.; de Bivort, L.

    1980-01-01

    This study examined the risks and risk management issues involved with the implementation by electric power utilities of compressed air energy storage and underground pumped hydro storage systems. The results are listed in terms of relative risks for the construction and operation of these systems in different geologic deposits, with varying amounts of pressurization, with natural or man-made disasters in the vicinity of the storage equipment, and with different modes of operating the facilities. (LCL)

  3. Cybersecurity Risk Management Process (RMP) Guideline - Final (May 2012) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Risk Management Process (RMP) Guideline - Final (May 2012) Cybersecurity Risk Management Process (RMP) Guideline - Final (May 2012) This electricity subsector cybersecurity Risk Management Process (RMP) guideline was developed by the Department of Energy, in collaboration with the National Institute of Standards and Technology (NIST) and the North American Electric Reliability Corporation (NERC). The RMP is written with the goal of enabling organizations- regardless of

  4. Risk assessment meta tool LDRD final report.

    SciTech Connect (OSTI)

    Bouchard, Ann Marie; Osbourn, Gordon Cecil

    2006-12-01

    The goal of this project was to develop a risk analysis meta tool--a tool that enables security analysts both to combine and analyze data from multiple other risk assessment tools on demand. Our approach was based on the innovative self-assembling software technology under development by the project team. This technology provides a mechanism for the user to specify his intentions at a very high level (e.g., equations or English-like text), and then the code self-assembles itself, taking care of the implementation details. The first version of the meta tool focused specifically in importing and analyzing data from Joint Conflict and Tactical Simulation (JCATS) force-on-force simulation. We discuss the problem, our approach, technical risk, and accomplishments on this project, and outline next steps to be addressed with follow-on funding.

  5. 2007 Wholesale Power Rate Case Final Proposal : Risk Analysis Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-07-01

    BPA's operating environment is filled with numerous uncertainties, and thus the rate-setting process must take into account a wide spectrum of risks. The objective of the Risk Analysis is to identify, model, and analyze the impacts that key risks have on BPA's net revenue (total revenues less total expenses). This is carried out in two distinct steps: a risk analysis step, in which the distributions, or profiles, of operating and non operating risks are defined, and a risk mitigation step, in which different rate tools are tested to assess their ability to recover BPA's costs in the face of this uncertainty. Two statistical models are used in the risk analysis step for this rate proposal, the Risk Analysis Model (RiskMod), and the Non-Operating Risk Model (NORM), while a third model, the ToolKit, is used to test the effectiveness of rate tools options in the risk mitigation step. RiskMod is discussed in Sections 2.1 through 2.4, the NORM is discussed in Section 2.5, and the ToolKit is discussed in Section 3. The models function together so that BPA can develop rates that cover all of its costs and provide a high probability of making its Treasury payments on time and in full during the rate period. By law, BPA's payments to Treasury are the lowest priority for revenue application, meaning that payments to Treasury are the first to be missed if financial reserves are insufficient to pay all bills on time. For this reason, BPA measures its potential for recovering costs in terms of probability of being able to make Treasury payments on time (also known as Treasury Payment Probability or TPP).

  6. Draft final risk assessment lime settling basins. Version 2. 1

    SciTech Connect (OSTI)

    Not Available

    1990-10-25

    The preferred alternative Lime Settling Basins (LSB) Interim Response Action (IRA) selected to inhibit further migration of contaminants from the LSB included moving the stockpiled lime sludge adjacent to the LSB back into the LSB, the construction of a subsurface barrier (i.e., slurry wall), placement of a soil cap and vegative cover, and the installation of a groundwater extraction system. This IRA is expected to be completed in approximately 6 months. The LSB IRA Risk Assessment (RA) presents the methodologies, quantitative and qualitative results, and assumptions used to determine if a potential risk exists to humans and biota from the activities of the LSB IRA. The activities associated with the relocation of the lime sludge into the LSB and the installation of the slurry wall are the focus of this RA, since they include disturbance of soils identified as contaminated.

  7. Geothermal Risk Reduction via Geothermal/Solar Hybrid Power Plants. Final

    Office of Scientific and Technical Information (OSTI)

    Report (Technical Report) | SciTech Connect Geothermal Risk Reduction via Geothermal/Solar Hybrid Power Plants. Final Report Citation Details In-Document Search Title: Geothermal Risk Reduction via Geothermal/Solar Hybrid Power Plants. Final Report There are numerous technical merits associated with a renewable geothermal-solar hybrid plant concept. The performance of air-cooled binary plants is lowest when ambient temperatures are high due to the decrease in air-cooled binary plant

  8. Microsoft Word - 45237 FINAL_Rulison_Risk_Report eq

    Office of Legacy Management (LM)

    Sc Po Fu Pr Jeffr Jenn Febr Publ reenin otentia uture N roject R rey I. Daniel y B. Chapm ruary 2011 ication No. ng Ass al Hum Natur Ruliso ls man 45237 Prepar Divisio Desert Prepar S. M. S U.S. D sessme man-H al-Ga on in W red by on of Hydro t Research In red for Stoller Corp Department o ent of Health s Drill Weste logic Scienc nstitute, Nev oration, Offi of Energy, G Risk ling N ern Co ces, Las Veg vada System fice of Legac Grand Junctio L from Near olorad gas, NV of Higher E cy Managem on,

  9. Cooled silicon nitride stationary turbine vane risk reduction. Final report

    SciTech Connect (OSTI)

    Holowczak, John

    1999-12-31

    The purpose of this program was to reduce the technical risk factors for demonstration of air cooled silicon nitride turbine vanes. The effort involved vane prototype fabrication efforts at two U.S. based gas turbine grade silicon nitride component manufacturers. The efficacy of the cooling system was analyzed via a thermal time/temperature flow test technique previously at UTRC. By having multiple vendors work on parts fabrication, the chance of program success increased for producing these challenging components. The majority of the effort under this contract focused on developing methods for, and producing, the complex thin walled silicon nitride vanes. Components developed under this program will undergo engine environment testing within N00014-96-2-0014.

  10. Novel Threat-risk Index Using Probabilistic Risk Assessment and Human Reliability Analysis - Final Report

    SciTech Connect (OSTI)

    George A. Beitel

    2004-02-01

    In support of a national need to improve the current state-of-the-art in alerting decision makers to the risk of terrorist attack, a quantitative approach employing scientific and engineering concepts to develop a threat-risk index was undertaken at the Idaho National Engineering and Environmental Laboratory (INEEL). As a result of this effort, a set of models has been successfully integrated into a single comprehensive model known as Quantitative Threat-Risk Index Model (QTRIM), with the capability of computing a quantitative threat-risk index on a system level, as well as for the major components of the system. Such a threat-risk index could provide a quantitative variant or basis for either prioritizing security upgrades or updating the current qualitative national color-coded terrorist threat alert.

  11. Planning for risk-informed/performance-based fire protection at nuclear power plants. Final report

    SciTech Connect (OSTI)

    Najafi, B.; Parkinson, W.J.; Lee, J.A.

    1997-12-01

    This document presents a framework for discussing issues and building consensus towards use of fire modeling and risk technology in nuclear power plant fire protection program implementation. The plan describes a three-phase approach: development of core technologies, implementation of methods, and finally, case studies and pilot applications to verify viability of such methods. The core technologies are defined as fire modeling, fire and system tests, use of operational data, and system and risk techniques. The implementation phase addresses the programmatic issues involved in implementing a risk-informed/performance-based approach in an integrated approach with risk/performance measures. The programmatic elements include: (1) a relationship with fire codes and standards development as defined by the ongoing effort of NFPA for development of performance-based standards; (2) the ability for NRC to undertake inspection and enforcement; and (3) the benefit to utilities in terms of cost versus safety. The case studies are intended to demonstrate applicability of single issue resolution while pilot applications are intended to check the applicability of the integrated program as a whole.

  12. Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors: Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Vierow, Karen; Aldemir, Tunc

    2009-09-10

    The project entitled, “Uncertainty Quantification in the Reliability and Risk Assessment of Generation IV Reactors”, was conducted as a DOE NERI project collaboration between Texas A&M University and The Ohio State University between March 2006 and June 2009. The overall goal of the proposed project was to develop practical approaches and tools by which dynamic reliability and risk assessment techniques can be used to augment the uncertainty quantification process in probabilistic risk assessment (PRA) methods and PRA applications for Generation IV reactors. This report is the Final Scientific/Technical Report summarizing the project.

  13. Analyzing health risks due to trace substance emissions from utility fossil-fired plants. Final report

    SciTech Connect (OSTI)

    1997-12-01

    EPRI has undertaken a number of project addressing a range of issues on the potential health effects due to long-term inhalation exposure to trace substances emitted from utility stacks. This report describes particular studies conducted to assess the health risks due to emissions from groups of power plants operated by individual utility companies. Researchers conducted specialized risk assessments for each of the power plants involved by incorporating utility-specific data into a modeling framework developed as part of EPRI`s Comprehensive Risk Evaluation (CORE) project to tailor the analysis for the individual utility. The results indicated the value of using more up-to-date, precise data in conducting risk assessments, rather than default assumptions. The report also describes CRAFT, the Comprehensive Risk Assessment Framework for Toxics software package, developed to perform these utility-wide air toxics risk assessments.

  14. FINAL Letter v1, 1/12/15, CRESP Site-Wide Risk Review Project 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Letter v1, 1/12/15, CRESP Site-Wide Risk Review Project 1 Author: Pam Larsen The Honorable Monica Regalbuto Assistant Secretary for Environmental Management Subject: Discontinue funding for CRESP studies from Hanford cleanup dollars Dear Assistant Secretary Regalbuto: The Hanford Advisory Board (HAB) is writing with respect to the draft Hanford Site-Wide Risk Review Project's Interim Progress Report (August 31, 2015), prepared by the Consortium for Risk Evaluation with Stakeholder Participation

  15. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants - Final Technical Report

    SciTech Connect (OSTI)

    Ritterbusch, Stanley; Golay, Michael; Duran, Felicia; Galyean, William; Gupta, Abhinav; Dimitrijevic, Vesna; Malsch, Marty

    2003-01-29

    OAK B188 Summary of methods proposed for risk informing the design and regulation of future nuclear power plants. All elements of the historical design and regulation process are preserved, but the methods proposed for new plants use probabilistic risk assessment methods as the primary decision making tool.

  16. Committee to evaluate Sandia`s risk expertise: Final report. Volume 1: Presentations

    SciTech Connect (OSTI)

    Dudley, E.C.

    1998-05-01

    On July 1--2, 1997, Sandia National Laboratories hosted the External Committee to Evaluate Sandia`s Risk Expertise. Under the auspices of SIISRS (Sandia`s International Institute for Systematic Risk Studies), Sandia assembled a blue-ribbon panel of experts in the field of risk management to assess their risk programs labs-wide. Panelists were chosen not only for their own expertise, but also for their ability to add balance to the panel as a whole. Presentations were made to the committee on the risk activities at Sandia. In addition, a tour of Sandia`s research and development programs in support of the US Nuclear Regulatory Commission was arranged. The panel attended a poster session featuring eight presentations and demonstrations for selected projects. Overviews and viewgraphs from the presentations are included in Volume 1 of this report. Presentations are related to weapons, nuclear power plants, transportation systems, architectural surety, environmental programs, and information systems.

  17. 2007 Wholesale Power Rate Case Final Proposal : Risk Analysis Study Documentation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-07-01

    The RiskMod Model is comprised of a set of risk simulation models, collectively referred to as RiskSim; a set of computer programs that manages data referred to as Data Management Procedures; and RevSim, a model that calculates net revenues. RiskMod interacts with the AURORA Model, the RAM2007, and the ToolKit Model during the process of performing the Risk Analysis Study. AURORA is the computer model being used to perform the Market Price Forecast Study (see Market Price Forecast Study, WP-07-FS-BPA-03); the RAM2007 is the computer model being used to calculate rates (see Wholesale Power Rate Development Study, WP-07-FS-BPA-05); and the ToolKit is the computer model being used to develop the risk mitigation package that achieves BPA's 92.6 percent TPP standard (see Section 3 in the Risk Analysis Study, WP-07-FS-BPA-04). Variations in monthly loads, resources, natural gas prices, forward market electricity prices, transmission expenses, and aluminum smelter benefit payments are simulated in RiskSim. Monthly spot market electricity prices for the simulated loads, resources, and natural gas prices are estimated by the AURORA Model. Data Management Procedures facilitate the format and movement of data that flow to and/or from RiskSim, AURORA, and RevSim. RevSim estimates net revenues using risk data from RiskSim, spot market electricity prices from AURORA, loads and resources data from the Load Resource Study, WP-07-FS-BPA-01, various revenues from the Revenue Forecast component of the Wholesale Power Rate Development Study, WP-07-FSBPA-05, and rates and expenses from the RAM2007. Annual average surplus energy revenues, purchased power expenses, and section 4(h)(10)(C) credits calculated by RevSim are used in the Revenue Forecast and the RAM2007. Heavy Load Hour (HLH) and Light Load Hour (LLH) surplus and deficit energy values from RevSim are used in the Transmission Expense Risk Model. Net revenues estimated for each simulation by RevSim are input into the Tool

  18. Risk assessment for produced water discharges to Louisiana open bays. Final report

    SciTech Connect (OSTI)

    Meinhold, A.F.; DePhillips, M.P.; Holtzman, S.

    1996-03-22

    The US Department of Energy (USDOE) has a program of research in the environmental aspects of oil and gas extraction. This sampling project will characterize the environmental impacts associated with the discharge of naturally occurring radioactive materials (NORM), metals and organics in produced water. This report is part of a series of studies of the health and ecological risks from discharges of produced water to the Gulf of Mexico, supported by the USDOE. These assessments are being coordinated with the field study, using the collected data to perform human health and ecological risk assessments. These assessments will provide input to regulators in the development of guidelines and permits, and to industry in the development and use of appropriate discharge practices. The initial human health and ecological risk assessments consist of conservative screening analyses meant to identify potentially important contaminants, and to eliminate others from further consideration. More quantitative assessments were done for contaminants identified, in the screening analysis, as being of potential concern. Section 2 gives an overview of human health and ecological risk assessment to help put the analyses presented here in perspective. Section 3 provides the hazard assessment portion of the risk assessment, and identifies the important receptors and pathways of concern. Section 3 also outlines the approach taken to the risk assessments presented in the rest of the report. The remaining sections (4 through 9) present the human health and ecological risk assessments for discharges of produced water to open bays in Louisiana.

  19. Risk Evaluation for CO2 Geosequestration in the Knox Supergroup, Illinois Basin Final Report

    SciTech Connect (OSTI)

    Hnottavange-Telleen, Ken; Leetaru, Hannes

    2014-09-30

    This report describes a process and provides seed information for identifying and evaluating risks pertinent to a hypothetical carbon dioxide (CO2) capture and sequestration (CCS) project. In the envisioned project, the target sequestration reservoir rock is the Potosi Formation of the Knox Supergroup. The Potosi is identified as a potential target formation because (1) at least locally, it contains vuggy to cavernous layers that have very high porosity, and (2) it is present in areas where the deeper Mt. Simon Sandstone (a known potential reservoir unit) is absent or nonporous. The key report content is discussed in Section 3.3, which describes two lists of Features, Events, and Processes (FEPs) that should be considered during the design stage of such a project. These lists primarily highlight risk elements particular to the establishment of the Potosi as the target formation in general. The lists are consciously incomplete with respect to risk elements that would be relevant for essentially all CCS projects regardless of location or geology. In addition, other risk elements specific to a particular future project site would have to be identified. Sources for the FEPs and scenarios listed here include the iconic Quintessa FEPs list developed for the International Energy Agency Greenhouse Gas (IEAGHG) Programme; previous risk evaluation projects executed by Schlumberger Carbon Services; and new input solicited from experts currently working on aspects of CCS in the Knox geology. The projects used as sources of risk information are primarily those that have targeted carbonate reservoir rocks similar in age, stratigraphy, and mineralogy to the Knox-Potosi. Risks of using the Potosi Formation as the target sequestration reservoir for a CCS project include uncertainties about the levels of porosity and permeability of that rock unit; the lateral consistency and continuity of those properties; and the ability of the project team to identify suitable (i.e., persistently

  20. Evaluation of safety assessment methodologies in Rocky Flats Risk Assessment Guide (1985) and Building 707 Final Safety Analysis Report (1987)

    SciTech Connect (OSTI)

    Walsh, B.; Fisher, C.; Zigler, G.; Clark, R.A.

    1990-11-09

    FSARs. Rockwell International, as operating contractor at the Rocky Flats plant, conducted a safety analysis program during the 1980s. That effort resulted in Final Safety Analysis Reports (FSARs) for several buildings, one of them being the Building 707 Final Safety Analysis Report, June 87 (707FSAR) and a Plant Safety Analysis Report. Rocky Flats Risk Assessment Guide, March 1985 (RFRAG85) documents the methodologies that were used for those FSARs. Resources available for preparation of those Rocky Flats FSARs were very limited. After addressing the more pressing safety issues, some of which are described below, the present contractor (EG&G) intends to conduct a program of upgrading the FSARs. This report presents the results of a review of the methodologies described in RFRAG85 and 707FSAR and contains suggestions that might be incorporated into the methodology for the FSAR upgrade effort.

  1. Expert judgment in assessing radwaste risks: What Nevadans should know about Yucca Mountain; [Final report

    SciTech Connect (OSTI)

    Shrader-Frechette, K.

    1992-06-01

    For phenomena characterized by accurate and largely complete data, quantitative risk assessment (QRA) provides extraordinarily valuable and objective information. However, with phenomena for which the data, models, or probabilities are incomplete or uncertain, QRA may be less useful and more questionable, because its conclusions are typically empirically and theoretically underdetermined. In the face of empirical or theoretical underdetermination, scientists often are forced to make a number of methodological value judgments and inferences about how to estimate and evaluate the associated risks. The purpose of this project is to evaluate instances of methodological value judgments and invalid or imprecise inferences that have occurred in the QRA done for the proposed Yucca Mountain high-level radioactive waste facility. We shall show (1) that questionable methodological value judgments and inferences have occurred in some Yucca Mountain QRA`S; (2) that questionable judgments and inferences, similar to those in the Yucca Mountain studies, have occurred in previous QRA`s done for other radiation-related facilities and have likely caused earlier QRA`s to err in specific ways; and (3) that, because the value judgments and problems associated with some Yucca Mountain QRA`s include repetitions of similar difficulties in earlier studies, therefore the QRA conclusions of some Yucca Mountain analyses are, at best, uncertain.

  2. Final Report: Risk assessment for produced water discharges to Louisiana open bays

    SciTech Connect (OSTI)

    Meinhold, A.F.; DePhillips, M.P.; Holtzman, S.

    1996-03-01

    Potential human health and environmental impacts from discharges of produced water to the Gulf of Mexico are of concern to regulators at the State and Federal levels, the public, environmental interest groups and industry. Current and proposed regulations require a zero discharge limit for coastal facilities, based primarily on studies in low energy, poorly flushed environments. However, produced water discharges in coastal Louisiana include a number of open bay sites, where potential human health and environmental impacts are likely to be smaller than those demonstrated for low energy canal environments, but greater than the minimal impacts associated with offshore discharges. Additional data and assessments are needed to support risk managers at the State and Federal levels in the development of regulations that protect human health and the environment without unnecessary cost to the economic welfare of the region and the nation. This project supports the Natural Gas and Oil Initiative objectives to: (1) improve coordination on environmental research; (2) streamline State and Federal regulation; (3) enhance State, and Federal regulatory decision making capability; (4) enhance dialogue through industry/government/public partnerships; and (5) work with States and Native American Tribes.

  3. Geothermal Risk Reduction via Geothermal/Solar Hybrid Power Plants. Final Report

    SciTech Connect (OSTI)

    Wendt, Daniel; Mines, Greg; Turchi, Craig; Zhu, Guangdong

    2015-11-01

    There are numerous technical merits associated with a renewable geothermal-solar hybrid plant concept. The performance of air-cooled binary plants is lowest when ambient temperatures are high due to the decrease in air-cooled binary plant performance that occurs when the working fluid condensing temperature, and consequently the turbine exhaust pressure, increases. Electrical power demand is generally at peak levels during periods of elevated ambient temperature and it is therefore especially important to utilities to be able to provide electrical power during these periods. The time periods in which air-cooled binary geothermal power plant performance is lowest generally correspond to periods of high solar insolation. Use of solar heat to increase air-cooled geothermal power plant performance during these periods can improve the correlation between power plant output and utility load curves. While solar energy is a renewable energy source with long term performance that can be accurately characterized, on shorter time scales of hours or days it can be highly intermittent. Concentrating solar power (CSP), aka solar-thermal, plants often incorporate thermal energy storage to ensure continued operation during cloud events or after sunset. Hybridization with a geothermal power plant can eliminate the need for thermal storage due to the constant availability of geothermal heat. In addition to the elimination of the requirement for solar thermal storage, the ability of a geothermal/solar-thermal hybrid plant to share a common power block can reduce capital costs relative to separate, stand-alone geothermal and solar-thermal power plant installations. The common occurrence of long-term geothermal resource productivity decline provides additional motivation to consider the use of hybrid power plants in geothermal power production. Geothermal resource productivity decline is a source of significant risk in geothermal power generation. Many, if not all, geothermal resources

  4. Public knowledge and perceptions of chemical risks in six communities: Analysis of a baseline survey. Final report on Phase 1

    SciTech Connect (OSTI)

    McCallum, D.B.; Hammond, S.L.; Morris, L.A.; Covello, V.T.

    1990-01-01

    A survey of public knowledge and perceptions of chemical risk was conducted in six communities. The purpose was to establish a baseline for evaluating change over time in knowledge, attitudes, and behaviors in response to new information about toxic chemicals, especially as related to Superfund, the Community Right-to-Know Law (SARA Title III), and other risk communication activities. During July and August, 1988, over 500 citizens responded to a 25-minute telephone survey in each city: Albuquerque NM, Cincinnati, OH, Durham NC, Middlesex County NJ, Racine WI, and Richmond VA. The report provides an overview of how citizens in these communities view environmental risks, and how the communities differ in their basic knowledge and attitudes about such risks. Recommendations are provided, for use in preparing risk communication programs and materials.

  5. Final Report

    SciTech Connect (OSTI)

    Marchant, Gary E.

    2013-04-23

    This is the final report of a two year project entitled "Governing Nanotechnology Risks and Benefits in the Transition to Regulation: Innovative Public and Private Approaches." This project examined the role of new governance or "soft law" mechanisms such as codes of conduct, voluntary programs and partnership agreements to manage the risks of emerging technologies such as nanotechnology. A series of published or in publication papers and book chapters are attached.

  6. State and national energy environmental risk analysis systems for underground injection control. Final report, April 7, 1992--May 31, 1995

    SciTech Connect (OSTI)

    1995-05-01

    The purpose of this effort is to develop and demonstrate the concept of a national Energy and Environmental Risk Analysis System that could support DOE policy analysis and decision-making. That effort also includes the development and demonstration of a methodology for assessing the risks of groundwater contamination from underground injection operations. EERAS is designed to enhance DOE`s analytical capabilities by working with DOE`s existing resource analysis models for oil and gas. The full development of EERAS was not planned as part of this effort. The design and structure for the system were developed, along with interfaces that facilitate data input to DOE`s other analytical tools. The development of the database for EERAS was demonstrated with the input of data related to underground injection control, which also supported the risk assessment being performed. The utility of EERAS has been demonstrated by this effort and its continued development is recommended. Since the absolute risk of groundwater contamination due to underground injection is quite low, the risk assessment methodology focuses on the relative risk of groundwater contamination. The purpose of this methodology is to provide DOE with an enhanced understanding of the relative risks posed nationwide as input to DOE decision-making and resource allocation. Given data problems encountered, a broad assessment of all oil reservoirs in DOE`s resource database was not possible. The methodology was demonstrated using a sample of 39 reservoirs in 15 states. While data difficulties introduce substantial uncertainties, the results found are consistent with expectations and with prior analyses. Therefore the methodology for performing assessments appears to be sound. Recommendations on steps that can be taken to resolve uncertainties or obtain improved data are included in the report.

  7. Final safety analysis report for the Galileo mission: Volume 3 (Book 2), Nuclear risk analysis document: Appendices: Revision 1

    SciTech Connect (OSTI)

    Not Available

    1989-01-25

    It is the purpose of the NRAD to provide an analysis of the range of potential consequences of accidents which have been identified that are associated with the launching and deployment of the Galileo mission spacecraft. The specific consequences analyzed are those associated with the possible release of radioactive material (fuel) of the Radioisotope Thermoelectric Generators (RTGs). They are in terms of radiation doses to people and areas of deposition of radioactive material. These consequence analyses can be used in several ways. One way is to identify the potential range of consequences which might have to be dealt with if there were to be an accident with a release of fuel, so as to assure that, given such an accident, the health and safety of the public will be reasonably protected. Another use of the information, in conjunction with accident and release probabilities, is to estimate the risks associated with the mission. That is, most space launches occur without incident. Given an accident, the most probable result relative to the RTGs is complete containment of the radioactive material. Only a small fraction of accidents might result in a release of fuel and subsequent radiological consequences. The combination of probability with consequence is risk, which can be compared to other human and societal risks to assure that no undue risks are implied by undertaking the mission. Book 2 contains eight appendices.

  8. Final Report for the ZERT Project: Basic Science of Retention Issues, Risk Assessment & Measurement, Monitoring and Verification for Geologic Sequestration

    SciTech Connect (OSTI)

    Spangler, Lee; Cunningham, Alfred; Lageson, David; Melick, Jesse; Gardner, Mike; Dobeck, Laura; Repasky, Kevin; Shaw, Joseph; Bajura, Richard; McGrail, B Peter; Oldenburg, Curtis M; Wagoner, Jeff; Pawar, Rajesh

    2011-03-31

    ZERT has made major contributions to five main areas of sequestration science: improvement of computational tools; measurement and monitoring techniques to verify storage and track migration of CO{sub 2}; development of a comprehensive performance and risk assessment framework; fundamental geophysical, geochemical and hydrological investigations of CO{sub 2} storage; and investigate innovative, bio-based mitigation strategies.

  9. Pathways and barriers to genetic testing and screening: Molecular genetics meets the high-risk family. Final report

    SciTech Connect (OSTI)

    Duster, T.

    1998-11-01

    The proliferation of genetic screening and testing is requiring increasing numbers of Americans to integrate genetic knowledge and interventions into their family life and personal experience. This study examines the social processes that occur as families at risk for two of the most common autosomal recessive diseases, sickle cell disease (SC) and cystic fibrosis (CF), encounter genetic testing. Each of these diseases is found primarily in a different ethnic/racial group (CF in Americans of North European descent and SC in Americans of West African descent). This has permitted them to have a certain additional lens on the role of culture in integrating genetic testing into family life and reproductive planning. A third type of genetic disorder, the thalassemias was added to the sample in order to extent the comparative frame and to include other ethnic and racial groups.

  10. Centralized Cryptographic Key Management and Critical Risk Assessment - CRADA Final Report For CRADA Number NFE-11-03562

    SciTech Connect (OSTI)

    Abercrombie, R. K.; Peters, Scott

    2014-05-28

    The Department of Energy Office of Electricity Delivery and Energy Reliability (DOE-OE) Cyber Security for Energy Delivery Systems (CSEDS) industry led program (DE-FOA-0000359) entitled "Innovation for Increasing Cyber Security for Energy Delivery Systems (12CSEDS)," awarded a contract to Sypris Electronics LLC to develop a Cryptographic Key Management System for the smart grid (Scalable Key Management Solutions for Critical Infrastructure Protection). Oak Ridge National Laboratory (ORNL) and Sypris Electronics, LLC as a result of that award entered into a CRADA (NFE-11-03562) between ORNL and Sypris Electronics, LLC. ORNL provided its Cyber Security Econometrics System (CSES) as a tool to be modified and used as a metric to address risks and vulnerabilities in the management of cryptographic keys within the Advanced Metering Infrastructure (AMI) domain of the electric sector. ORNL concentrated our analysis on the AMI domain of which the National Electric Sector Cyber security Organization Resource (NESCOR) Working Group 1 (WG1) has documented 29 failure scenarios. The computational infrastructure of this metric involves system stakeholders, security requirements, system components and security threats. To compute this metric, we estimated the stakes that each stakeholder associates with each security requirement, as well as stochastic matrices that represent the probability of a threat to cause a component failure and the probability of a component failure to cause a security requirement violation. We applied this model to estimate the security of the AMI, by leveraging the recently established National Institute of Standards and Technology Interagency Report (NISTIR) 7628 guidelines for smart grid security and the International Electrotechnical Commission (IEC) 63351, Part 9 to identify the life cycle for cryptographic key management, resulting in a vector that assigned to each stakeholder an estimate of their average loss in terms of dollars per day of system

  11. Final Optics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    final optics Final Optics Schematic layout of NIF's final optics assembly (FOA). The suite of optics for one beamline is on the right. The final optics assemblies (FOAs) are the last element of the main laser system and the first of the target area systems. Each FOA contains four integrated optics modules (IOMs) that incorporate beam conditioning, frequency conversion, focusing, diagnostic sampling, and debris shielding capabilities into a single compact assembly. These optics are shown in the

  12. FINAL REPORT

    Office of Scientific and Technical Information (OSTI)

    FINAL REPORT Analytical and Elemental Analysis of Air and Soil Samples Facility and Public ... Information 4 Background 5 Stormwater Pollution 5 Erosion and Sediment Control Workshop ...

  13. FINAL RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RELEASE AWARDEE: ____________________________________________________ The work under Award No. DE-__________________________, dated ______________, between the United States of America (represented by the Department of Energy, National Energy Technology Laboratory, and the undersigned awardee, having been completed and finally accepted , and in consideration of Final Payment thereunder, the United States of America, its officers, agents and employees are hereby released from all liabilities,

  14. Risk Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants (Cooperative Agreement DE-FC03-99SF21902, Am. M004) Final Technical Report

    SciTech Connect (OSTI)

    Stanley E. Ritterbusch, et. al.

    2003-01-29

    accidents would be an inherent part of the Probabilistic Safety Assessment for the plant and their evaluation would be probabilistic. Other first year accomplishments include (1) the conversion of an NRC database for cross-referencing NRC criteria and industry codes and standards to Microsoft 2000 software, (2) an assessment of the NRC's hearing process which concluded that the normal cross-examination during public hearings is not actually required by the U.S. Administrative Procedures Act, (3) the identification and listing of reliability data sources, and (4) interfacing with other industry groups (e.g., NEI and IAEA) and NRC at workshops for risk-informing regulations. The major accomplishments during the second year consisted of (1) issuance of the final report for Subtask 1.1, ''Identify Current Applicable Regulatory Requirements [and Industry Standards],'' (2) issuance of the final report for Subtask 1.2,'' Identify Structures, Systems, and Components and Their Associate d Costs for a Typical Plant,'' (3) extension of the new, highly risk-informed design and regulatory framework to non-light-water-reactor technology, (4) completion of more detailed thermal-hydraulic and probabilistic analyses of advanced conceptual reactor system/component designs, (6) initial evaluation and recommendations for improvement of the NRC design review process, and (7) initial development of the software format, procedures and statistical routines needed to store, analyze and retrieve the available reliability data. Final reports for Subtasks 1.1 (regulatory and design criteria) and 1.2 (costs for structures, systems, and components) were prepared and issued. A final report for Subtask 1.3 (Regulatory Framework) was drafted with the aim to issue it in Phase 3 (Year 3). One technical report was produced for Subtask 1.4 (methods development) and two technical reports were produced for Subtask 1.6 (sample problem analysis). An interim report on the NRC design review process (Subtask 1.7) was

  15. Final Report

    SciTech Connect (OSTI)

    Gurney, Kevin R

    2015-01-12

    This document constitutes the final report under DOE grant DE-FG-08ER64649. The organization of this document is as follows: first, I will review the original scope of the proposed research. Second, I will present the current draft of a paper nearing submission to Nature Climate Change on the initial results of this funded effort. Finally, I will present the last phase of the research under this grant which has supported a Ph.D. student. To that end, I will present the graduate student’s proposed research, a portion of which is completed and reflected in the paper nearing submission. This final work phase will be completed in the next 12 months. This final workphase will likely result in 1-2 additional publications and we consider the results (as exemplified by the current paper) high quality. The continuing results will acknowledge the funding provided by DOE grant DE-FG-08ER64649.

  16. Final Report

    SciTech Connect (OSTI)

    Biros, George

    2014-08-18

    This the final report for the project "Large-Scale Optimization for Bayesian Inference in Complex Systems," for the work in the group of the co-PI George Biros.

  17. Final Report

    SciTech Connect (OSTI)

    DeTar, Carleton

    2012-12-10

    This document constitutes the Final Report for award DE-FC02-06ER41446 as required by the Office of Science. It summarizes accomplishments and provides copies of scientific publications with significant contribution from this award.

  18. River Corridor Baseline Risk Assessment (RCBRA) Human Health...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2011 River Corridor Baseline Risk Assessment (RCBRA) Human Health Risk Assessment (Volume 2) * RCBRA Human Health Risk Assessment is final - Response provided to HAB ...

  19. Final Report

    SciTech Connect (OSTI)

    R Paul Drake

    2004-01-12

    OAK-B135 This is the final report from the project Hydrodynamics by High-Energy-Density Plasma Flow and Hydrodynamics and Radiation Hydrodynamics with Astrophysical Applications. This project supported a group at the University of Michigan in the invention, design, performance, and analysis of experiments using high-energy-density research facilities. The experiments explored compressible nonlinear hydrodynamics, in particular at decelerating interfaces, and the radiation hydrodynamics of strong shock waves. It has application to supernovae, astrophysical jets, shock-cloud interactions, and radiative shock waves.

  20. Final Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    352 Regulatory and Utility Solutions to Advance SunShot Initiative Goals Interstate Renewable Energy Council, Inc. FINAL REPORT Project Title: "Regulatory and Utility Solutions to Advance SunShot Initiative Goals" Covering Period: 09/01/11 through 02/28/15 Date of Report: 04/20/2015 Recipient: Interstate Renewable Energy Council, Inc. (IREC) Award Number: DE-EE0005352 Working Partners: Keyes, Fox & Wiedman LLP Michael T. Sheehan Sherwood Associates, Inc. Kris Mayes Law Firm (KMLF)

  1. BP-12 Final Models Datasets

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MB, XLS) Tier 2 Module of RAM RAM Tier 2 Pricing Module (4.8 MB, XLS) Tool Kit Files (TPP) ToolKit v4.8.1 BP-12 Final Studies Release 4-Aug-11 (12.5 MB, XLS) Risk Mod Output...

  2. Final Report

    SciTech Connect (OSTI)

    Webb, Robert C.; Kamon, Teruki; Toback, David; Safonov, Alexei; Dutta, Bhaskar; Dimitri, Nanopoulos; Pope, Christopher; White, James

    2013-11-18

    Overview The High Energy Physics Group at Texas A&M University is submitting this final report for our grant number DE-FG02-95ER40917. This grant has supported our wide range of research activities for over a decade. The reports contained here summarize the latest work done by our research team. Task A (Collider Physics Program): CMS & CDF Profs. T. Kamon, A. Safonov, and D. Toback co-lead the Texas A&M (TAMU) collider program focusing on CDF and CMS experiments. Task D: Particle Physics Theory Our particle physics theory task is the combined effort of Profs. B. Dutta, D. Nanopoulos, and C. Pope. Task E (Underground Physics): LUX & NEXT Profs. R. Webb and J. White(deceased) lead the Xenon-based underground research program consisting of two main thrusts: the first, participation in the LUX two-phase xenon dark matter search experiment and the second, detector R&D primarily aimed at developing future detectors for underground physics (e.g. NEXT and LZ).

  3. Blackout 2003: Blackout Final Implementation Report | Department...

    Energy Savers [EERE]

    Blackout Risk D:0myfilesBlackout ProgressBlackout-Progress.vp U.S. - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations

  4. Full Final Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REPOR FULL FINAL REPOR T T SECTION III SECTION III FULL FINAL REPORT SECTION III Individual Project Summaries Table of Contents Algal Biology ..................................................................................................3 Cultivation ...................................................................................................41 Harvesting and Extraction .............................................................................65 Fuel Conversion

  5. Final Technical Report

    SciTech Connect (OSTI)

    Aristos Aristidou Natureworks); Robert Kean; Tom Schechinger; Stuart Birrell; Jill Euken

    2007-10-01

    The two main objectives of this project were: 1) to develop and test technologies to harvest, transport, store, and separate corn stover to supply a clean raw material to the bioproducts industry, and 2) engineer fermentation systems to meet performance targets for lactic acid and ethanol manufacturers. Significant progress was made in testing methods to harvest corn stover in a “single pass” harvest mode (collect corn grain and stover at the same time). This is technically feasible on small scale, but additional equipment refinements will be needed to facilitate cost effective harvest on a larger scale. Transportation models were developed, which indicate that at a corn stover yield of 2.8 tons/acre and purchase price of $35/ton stover, it would be unprofitable to transport stover more than about 25 miles; thus suggesting the development of many regional collection centers. Therefore, collection centers should be located within about 30 miles of the farm, to keep transportation costs to an acceptable level. These collection centers could then potentially do some preprocessing (to fractionate or increase bulk density) and/or ship the biomass by rail or barge to the final customers. Wet storage of stover via ensilage was tested, but no clear economic advantages were evident. Wet storage eliminates fire risk, but increases the complexity of component separation and may result in a small loss of carbohydrate content (fermentation potential). A study of possible supplier-producer relationships, concluded that a “quasi-vertical” integration model would be best suited for new bioproducts industries based on stover. In this model, the relationship would involve a multiyear supply contract (processor with purchase guarantees, producer group with supply guarantees). Price will likely be fixed or calculated based on some formula (possibly a cost plus). Initial quality requirements will be specified (but subject to refinement).Producers would invest in harvest

  6. Risk Analysis

    Broader source: Energy.gov [DOE]

    Almost any new technology involves some risk. Risks involved in working with hydrogen can be minimized through adherence to standard design parameters for equipment and procedures. The Fuel Cell...

  7. Microsoft Word - FINAL_RAP_Apr2007_summary.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2007 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE MEETING April 11, 2007 Richland, WA Topics in this Meeting Summary Welcome and Introductions ................................................................................................ 1 M-15 Supplemental Characterization ................................................................................. 1 Central Plateau Ecological Risk

  8. Final Project Report

    SciTech Connect (OSTI)

    Wang, Qiang; Dandy, David S.

    2015-05-15

    This is the final technical report of the DOE project DE-FG02-07ER46448 awarded to Colorado State University.

  9. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    Characteristics of U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" "Structural and ...

  10. National Science Bowl Finals

    ScienceCinema (OSTI)

    None

    2010-09-01

    National Science Bowl finals and awards at the National Building Museum in Washington D.C. Monday 5/3/2010

  11. DOE Final Report

    SciTech Connect (OSTI)

    Hinzman, Larry D.; Long, James; Newby, Greg B.

    2014-01-08

    This final report contains a summary of work accomplished in the establishment of a Climate Data Center at the International Arctic Research Center, University of Alaska Fairbanks.

  12. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Space Heating in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to ...

  13. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Appliances in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to 1949","1950 ...

  14. CFC Charity Fair Finale

    Broader source: Energy.gov [DOE]

    Finish out the 2012 CFC with the Charity Fair Finale! Buy cookies, participate in a putt-putt golf game, eat some popcorn, and meet and talk with CFC charity representatives.

  15. Final EIS Available

    Broader source: Energy.gov [DOE]

    DOE has published a Final Environmental Impact Statement (EIS) that considers all timely public comments on the Draft EIS and identifies DOE’s preferred project alternative(s). The U.S....

  16. CX-100 Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SAND2008-4648 Unlimited Release Printed July 2008 Blade System Design Studies Phase II: Final Project Report Derek S. Berry TPI Composites, Inc. 373 Market Street Warren, RI 02885...

  17. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    Water Heating in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ... Units","5 or More Units","Mobile Homes" "Water Heating" "Total Homes",113.6,71.8,6.7,9,19...

  18. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    Water Heating in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,,"Census Region" ,"Total U.S.1 (millions)" ,,"Northeast","Midwest","South","West" "Water ...

  19. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Water Heating in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ... Cold","Mixed- Humid","Mixed-Dry" "Water Heating",,"Cold",,"Hot-Dry","Hot-Humid","M...

  20. " Million Housing Units, Final...

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Water Heating in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ... to 119,999","120,000 or More" "Water Heating" "Total Homes",113.6,23.7,27.5,21....

  1. Aurora final report

    SciTech Connect (OSTI)

    Robert, Dross; Amedeo, Conti

    2013-12-06

    Final Technical report detailing the work done by Nuvera and its partners to fulfill the goals of the program "Transport Studies Enabling Efficiency Optimization of Cost-Competitive Fuel Cell Stacks" (a.k.a. AURORA)

  2. Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS - 0097-F c f ` f= ïżœc J m s= Final Environmental Impact Statement BONNEVILLE POWER ADMINISTRATION TRANSMISSION FACILITIES VEGETATION MANAGEMENT PROGRAM U.S. Department of Energy August 1983 Appendices albLbfp= J MMVTJc= Responsible Official: tfiif^j= ^K= s^rde^k= Assistant Secretary for Environmental Protection. Safety, and Emergency Prepafedness Final Environmental Impact Statement BONNEVILLE POWER ADM IN ISTRA TION TRANSMISSION FACILITIES VEGETATION MANAGEMENT PROGRAM U.S. Department of

  3. Blackout Final Implementation Report

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force Natural Resources Canada U.S. Department of Energy September 2006 Final Report on the Implementation of the Task Force Recommendations U.S.-Canada Power System Outage Task Force September 2006 Natural Resources Canada U.S. Department of Energy Acknowledgments This document was prepared by staff of Natural Resources Canada and the U.S. Department of Energy. The principal contributors

  4. Caspary Thesis Final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DENSITY AND BETA LIMITS IN THE MADISON SYMMETRIC TORUS REVERSED-FIELD PINCH by KYLE JONATHAN CASPARY A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy (PHYSICS) at the UNIVERSITY OF WISCONSIN-MADISON 2014 Date of final oral examination: March 24th, 2014 The dissertation is under review by the following members of the Final Oral Committee: Brett Chapman, Senior Scientist, Physics John Sarff, Professor, Physics Paul Terry, Professor, Physics

  5. Blackout Final Implementation Report

    Energy Savers [EERE]

    ... and Northeast and in Ontario, and why the blackout was not contained; and ii) to recommend measures to reduce the risk of future power outages and the scope of any that do occur. ...

  6. Microsoft PowerPoint - SWPA Transformer Oil Spill Risk Final...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    a system wide response to the issue of secondary containment of oil for transformers in service at Corps powerhouses and dam switchyards within Southwestern's marketing area. ...

  7. Microsoft PowerPoint - SWPA Transformer Oil Spill Risk Final...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to the issue of secondary containment of oil for transformers in service at Corps ... Scope Scope 397,000 Gallons of Oil 397,000 Gallons of Oil 69 Transformers 69 Transformers ...

  8. Risk Code?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Identify the Task Risk Code >2 Determine if a Work Control Document is needed What is the Unmitigated Risk Code? Rev.1 09/05/14 Read and Agree to Comply with appropriate mitigation and sign Work Control Documents Is there an approved Work Control Document (WCD)? WORK PLANNING, CONTROL AND AUTHORIZATION FLOW DIAGRAM 1. Define Scope of Work 2. Analyze Hazards 3. Develop and Implement Hazard Controls 4. Perform Work Within Controls 5. Feedback and Continuous Improvement Analyze Hazards and

  9. Final Technical Report

    SciTech Connect (OSTI)

    Gilbert, Chris

    2014-11-13

    The project, Capital Investment to Fund Equipment Purchases and Facility Modifications to Create a Sustainable Future for EnergyXchange served to replace landfill gas energy with alternative energy resources, primarily solar and wood waste. This is the final project closeout report.

  10. Final Technical Report

    SciTech Connect (OSTI)

    Maxwell, Mike, J., P.E.

    2012-08-30

    The STI product is the Final Technical Report from ReliOn, Inc. for contract award DE-EE0000487: Recovery Act PEM Fuel Cell Systems Providing Emergency Reserve and Backup Power. The program covered the turnkey deployment of 431 ReliOn fuel cell systems at 189 individual sites for AT&T and PG&E with ReliOn functioning as the primary equipment supplier and the project manager. The Final Technical Report provides an executive level summary, a comparison of the actual accomplishments vs. the goals and objectives of the project, as well as a summary of the project activity from the contract award date of August 1, 2009 through the contract expiration date of December 31, 2011. Two photos are included in the body of the report which show hydrogen storage and bulk hydrogen refueling technologies developed as a result of this program.

  11. Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Troxell, W; Batchelor, A

    2012-11-28

    Final report for the formation of faculty and education establishing Colorado State's Smart Grid Integration Center

  12. NIST Finalizes Initial Set of Smart Grid Cyber Security Guidelines |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Finalizes Initial Set of Smart Grid Cyber Security Guidelines NIST Finalizes Initial Set of Smart Grid Cyber Security Guidelines September 2, 2010 - 3:15pm Addthis WASHINGTON, D.C. - The National Institute of Standards and Technology (NIST) issued today its first Guidelines for Smart Grid Cyber Security, which includes high-level security requirements, a framework for assessing risks, an evaluation of privacy issues at personal residences, and additional information for

  13. Clean Fleet Final Report

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    2 P r o j e c t D e s i g n a n d I m p l e m e n t a t i o n FINAL REPORT December 1995 December 1995 This information was prepared by Battelle Memorial Institute, Columbus Operations, through sponsorship by various companies and associations, the South Coast Air Quality Management District (District), and the California Energy Commission (Commission). Battelle has endeavored to produce a high quality study consistent with its contract commitments. However, because of the research and/or

  14. Clean Fleet Final Report

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    3 V e h i c l e M a i n t e n a n c e a n d D u r a b i l i t y FINAL REPORT December 1995 December 1995 December 1995 This information was prepared by Battelle Memorial Institute, Columbus Operations, through sponsor- ship by various companies and associations, the South Coast Air Quality Management District (District), and the California Energy Commission (Commission). Battelle has endeavored to produce a high quality study consistent with its contract commitments. However, because of the

  15. Final Technical Report

    SciTech Connect (OSTI)

    Sobecky, Patricia A; Taillefert, Martial

    2013-03-29

    This final technical report describes results and findings from a research project to examine the role of microbial phosphohydrolase enzymes in naturally occurring subsurface microorganisms for the purpose of promoting the immobilization of the radionuclide uranium through the production of insoluble uranium phosphate minerals. The research project investigated the microbial mechanisms and the physical and chemical processes promoting uranium biomineralization and sequestration in oxygenated subsurface soils. Uranium biomineralization under aerobic conditions can provide a secondary biobarrier strategy to immobilize radionuclides should the metal precipitates formed by microbial dissimilatory mechanisms remobilize due to a change in redox state.

  16. Microsoft Word - Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Assessment of the Performance of COBRA-TF for the Prediction of Subcooled Boiling Conditions in Rod Bundles Dr. J. Michael Doster NCSU September 30, 2013 CASL-8-2013-0201-000 Final Report L3.THM.CFD.P7.07 Dr. J. Michael Doster Nuclear Engineering Department North Carolina State University Assessment of the Performance of COBRA-TF for the Prediction of Subcooled Boiling Conditions in Rod Bundles September 30, 2013 CASL-U-2013-0201-000 INTRODUCTION An assessment has been performed of the

  17. NTSF Spring 2010 Final Agenda

    Broader source: Energy.gov [DOE]

    Final Agenda for the U.S. Department of Energy's National Transportation Stakeholder Forum taking place in Chicago, Illinois.

  18. Final Scientific EFNUDAT Workshop

    ScienceCinema (OSTI)

    None

    2011-10-06

    The Final Scientific EFNUDAT Workshop - organized by the CERN/EN-STI group on behalf of n_TOF Collaboration - will be held at CERN, Geneva (Switzerland) from 30 August to 2 September 2010 inclusive.EFNUDAT website: http://www.efnudat.euTopics of interest include: Data evaluationCross section measurementsExperimental techniquesUncertainties and covariancesFission propertiesCurrent and future facilities  International Advisory Committee: C. Barreau (CENBG, France)T. Belgya (IKI KFKI, Hungary)E. Gonzalez (CIEMAT, Spain)F. Gunsing (CEA, France)F.-J. Hambsch (IRMM, Belgium)A. Junghans (FZD, Germany)R. Nolte (PTB, Germany)S. Pomp (TSL UU, Sweden) Workshop Organizing Committee: Enrico Chiaveri (Chairman)Marco CalvianiSamuel AndriamonjeEric BerthoumieuxCarlos GuerreroRoberto LositoVasilis Vlachoudis Workshop Assistant: Géraldine Jean

  19. Final Scientific EFNUDAT Workshop

    ScienceCinema (OSTI)

    None

    2011-10-06

    The Final Scientific EFNUDAT Workshop - organized by the CERN/EN-STI group on behalf of n_TOF Collaboration - will be held at CERN, Geneva (Switzerland) from 30 August to 2 September 2010 inclusive.EFNUDAT website: http://www.efnudat.euTopics of interest include: Data evaluationCross section measurementsExperimental techniquesUncertainties and covariancesFission propertiesCurrent and future facilities  International Advisory Committee: C. Barreau (CENBG, France)T. Belgya (IKI KFKI, Hungary)E. Gonzalez (CIEMAT, Spain)F. Gunsing (CEA, France)F.-J. Hambsch (IRMM, Belgium)A. Junghans (FZD, Germany)R. Nolte (PTB, Germany)S. Pomp (TSL UU, Sweden) Workshop Organizing Committee: Enrico Chiaveri (Chairman)Marco CalvianiSamuel AndriamonjeEric BerthoumieuxCarlos GuerreroRoberto LositoVasilis Vlachoudis Workshop Assistant: Géraldine Jean

  20. Final Progress Report

    SciTech Connect (OSTI)

    Josef Michl

    2011-10-31

    In this project we have established guidelines for the design on organic chromophores suitable for producing high triplet yields via singlet fission. We have proven their utility by identifying a chromophore of a structural class that had never been examined for singlet fission before, 1,3-diphenylisobenzofuran, and demonstrating in two independent ways that a thin layer of this material produces a triplet yield of 200% within experimental error. We have also designed a second chromophore of a very different type, again of a structural class that had not been examined for singlet fission before, and found that in a thin layer it produces a 70% triplet yield. Finally, we have enhanced the theoretical understanding of the quantum mechanical nature of the singlet fission process.

  1. FINAL/ SCIENTIFIC TECHNICAL REPORT

    SciTech Connect (OSTI)

    McDonald, Henry; Singh, Suminderpal

    2006-08-28

    The overall objective of the Chattanooga fuel cell demonstrations project was to develop and demonstrate a prototype 5-kW grid-parallel, solid oxide fuel cell (SOFC) system that co-produces hydrogen, based on Ion America’s technology. The commercial viability of the 5kW SOFC system was tested by transporting, installing and commissioning the SOFC system at the Alternative Energy Laboratory at the University of Tennessee – Chattanooga. The system also demonstrated the efficiency and the reliability of the system running on natural gas. This project successfully contributed to the achievement of DOE technology validation milestones from the Technology Validation section of the Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan. Results of the project can be found in the final technical report.

  2. ESPC ENABLE Final Proposal Requirements

    Broader source: Energy.gov [DOE]

    Document describes the final proposal requirements for consideration by an energy service company (ESCO) for an agency’s Request for Quote/Notice of Opportunity or final proposal. If selected to perform a site investment grade audit, the ESCO will be required to present the findings from the IGA and a project price to the agency in the form of a final proposal.

  3. NGDS Final Report

    SciTech Connect (OSTI)

    Blackman, Harold; Moore, Joseph

    2014-06-30

    The ultimate goal of the National Geothermal Data System (NGDS) is to support the discovery and generation of geothermal sources of energy. The NGDS was designed and has been implemented to provide online access to important geothermal-related data from a network of data providers in order to: ‱ Increase the efficiency of exploration, development and usage of geothermal energy by providing a basis for financial risk analysis of potential sites ‱ Assist state and federal agencies in making land and resource management assessments ‱ Foster the discovery of new geothermal resources by supporting ongoing and future geothermal-related research ‱ Increase public awareness of geothermal energy It is through the implementation of this distributed data system and its subsequent use that substantial increases to the general access and understanding of geothermal related data will result. NGDS provides a mechanism for the sharing of data thereby fostering the discovery of new resources and supporting ongoing geothermal research.

  4. Technical Report - FINAL

    SciTech Connect (OSTI)

    Barbara Luke, Director, UNLV Engineering Geophysics Laboratory

    2007-04-25

    Improve understanding of the earthquake hazard in the Las Vegas Valley and to assess the state of preparedness of the area's population and structures for the next big earthquake. 1. Enhance the seismic monitoring network in the Las Vegas Valley 2. Improve understanding of deep basin structure through active-source seismic refraction and reflection testing 3. Improve understanding of dynamic response of shallow sediments through seismic testing and correlations with lithology 4. Develop credible earthquake scenarios by laboratory and field studies, literature review and analyses 5. Refine ground motion expectations around the Las Vegas Valley through simulations 6. Assess current building standards in light of improved understanding of hazards 7. Perform risk assessment for structures and infrastructures, with emphasis on lifelines and critical structures 8. Encourage and facilitate broad and open technical interchange regarding earthquake safety in southern Nevada and efforts to inform citizens of earthquake hazards and mitigation opportunities

  5. Final Technical Report

    SciTech Connect (OSTI)

    Michael Read; R. Lawrence Ives; Patrick Ferguson

    2010-05-17

    Calabazas Creek Research Inc. (CCR) completed Phase I the development of a 10 MW, 1.3 GHz, annular beam klystron (ABK) for driving advanced accelerators, such as the International Linear Collider (ILC). Through detailed simulations in Phase I, CCR produced a design that meets all of the requirements for ILC. The ABK uses an annular beam to minimize space charge depression and the impedance. This allows the relatively low voltage of 120 kV specified for the International Linear Collider (ILC). Like the sheet beam klystron, the ABK uses a thin beam located close to the drift tube walls; however, it operates with lower risk, single mode cavities. In addition, it is azimuthally symmetric, dramatically reducing design and fabrication costs. It provides the same operating characteristics as a multi-beam klystron, but is far simpler and will be easier and less expensive to fabricate.

  6. Nested Narratives Final Report.

    SciTech Connect (OSTI)

    Wilson, Andrew T.; Pattengale, Nicholas D.; Forsythe, James C.; Carvey, Bradley John

    2015-02-01

    In cybersecurity forensics and incident response, the story of what has happened is the most impor- tant artifact yet the one least supported by tools and techniques. Existing tools focus on gathering and manipulating low-level data to allow an analyst to investigate exactly what happened on a host system or a network. Higher-level analysis is usually left to whatever ad hoc tools and techniques an individual may have developed. We discuss visual representations of narrative in the context of cybersecurity incidents with an eye toward multi-scale illustration of actions and actors. We envision that this representation could smoothly encompass individual packets on a wire at the lowest level and nation-state-level actors at the highest. We present progress to date, discuss the impact of technical risk on this project and highlight opportunities for future work.

  7. Verbal risk in communicating risk

    SciTech Connect (OSTI)

    Walters, J.C.; Reno, H.W.

    1993-03-01

    When persons in the waste management industry have a conversation concerning matters of the industry, thoughts being communicated are understood among those in the industry. However, when persons in waste management communicate with those outside the industry, communication may suffer simply because of poor practices such as the use of jargon, euphemisms, acronyms, abbreviations, language usage, not knowing audience, and public perception. This paper deals with ways the waste management industry can communicate risk to the public without obfuscating issues. The waste management industry should feel obligated to communicate certain meanings within specific contexts and, then, if the context changes, should not put forth a new, more appropriate meaning to the language already used. Communication of the waste management industry does not have to be provisional. The authors suggest verbal risks in communicating risk can be reduced significantly or eliminated by following a few basic communication principles. The authors make suggestions and give examples of ways to improve communication with the general public by avoiding or reducing jargon, euphemisms, and acronyms; knowing the audience; avoiding presumptive knowledge held by the audience; and understanding public perception of waste management issues.

  8. Ecological Risk Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ecological Risk Assessments Ecological Risk Assessments Ecological risk assessment is the appraisal of potential adverse effects of exposure to contaminants on plants and animals....

  9. Title XVII Final Rule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Rule Title XVII Final Rule Title XVII Final Rule (107.56 KB) More Documents & Publications Final Rule (December 4, 2009) Notice of Proposed Rulemaking (August 6, 2009) Final Rule (October 23, 2007)

  10. MIST final report

    SciTech Connect (OSTI)

    Gloudemans, J.R. )

    1991-08-01

    The multiloop integral system test (MIST) was part of a multiphase program started in 1983 to address small-break loss-of-coolant accidents (SBLOCAs) specific to Babcock Wilcox-designed plants. MIST was sponsored by the US Nuclear Regulatory Commission, the Babcock Wilcox Owners Group, the Electric Power Research Institute, and Babcock Wilcox. The unique features of the Babcock Wilcox design, specifically the hot leg U-bends and steam generators, prevented the use of existing integral system data or existing integral system facilities to addresss the thermal-hydraulic SBLOCA questions. MIST was specifically designed and constructed for this program, and an existing facility -- the once-through integral system (OTIS) -- was also used. Data from MIST and OTIS are used to benchmark the adequacy of system codes, such as RELAP5 and TRAC, for predicting abnormal plant transients. The MIST program is reported in eleven volumes; Volumes 2 through 8 pertain to groups of Phase 3 tests by type, Volume 9 presents inter-group comparisons. Volume 10 provides comparisons between the RELAP5 MOD2 calculations and MIST observations, and Volume 11 (with addendum) presents the later, Phase 4 tests. This is Volume 1 of the MIST final report, a summary of the entire MIST program. Major topics include: test advisory grop (TAG) issues; facility scaling and design; test matrix; observations; comparisons of RELAP5 calculations to MIST observations; and MIST versus the TAG issues. 11 refs., 29 figs., 9 tabs.

  11. Final Report to DOE

    SciTech Connect (OSTI)

    Ismail Gultepe

    2012-05-15

    This final report summarizes the accomplished goals and provide a list of the publications and presentations made during the project. The goals of the project were accomplished through the various publications submitted to Journals and presentations done at the DOE and international meetings and conferences. The 8 journal articles related to the goals of this project were accepted or submitted. The 23 presentations related to goals of the project were presented at the meetings. There were some minor changes regarding to project goals because of issues encountered during the analysis of the data. For example, a total water probe sensor mounted on the Convair-580 that can be used for defining mixed phase conditions and parameterization, had some problems to estimate magnitude of total water mass, and this resulted in issues providing an accurate parameterization for cloud fraction. Variability related aerosol number concentrations and their composition for direct and indirect effects were studied and published. Results were given to explain aerosol and ice microphysical effects on climate change studies. It is suggested that developed parameterizations should consider the variability in aerosol and ice parameters over the Arctic regions.

  12. Tiger LDRD final report

    SciTech Connect (OSTI)

    Steich, D J; Brugger, S T; Kallman, J S; White, D A

    2000-02-01

    This final report describes our efforts on the Three-Dimensional Massively Parallel CEM Technologies LDRD project (97-ERD-009). Significant need exists for more advanced time domain computational electromagnetics modeling. Bookkeeping details and modifying inflexible software constitute a vast majority of the effort required to address such needs. The required effort escalates rapidly as problem complexity increases. For example, hybrid meshes requiring hybrid numerics on massively parallel platforms (MPPs). This project attempts to alleviate the above limitations by investigating flexible abstractions for these numerical algorithms on MPPs using object-oriented methods, providing a programming environment insulating physics from bookkeeping. The three major design iterations during the project, known as TIGER-I to TIGER-III, are discussed. Each version of TIGER is briefly discussed along with lessons learned during the development and implementation. An Application Programming Interface (API) of the object-oriented interface for Tiger-III is included in three appendices. The three appendices contain the Utilities, Entity-Attribute, and Mesh libraries developed during the project. The API libraries represent a snapshot of our latest attempt at insulated the physics from the bookkeeping.

  13. Final Technical Report

    SciTech Connect (OSTI)

    Alexander Fridman

    2005-06-01

    This DOE project DE-FC36-04GO14052 ''Plasma Pilot Plant Test for Treating VOC Emissions from Wood Products Plants'' was conducted by Drexel University in cooperation with Georgia-Pacific (G-P) and Kurchatov Institute (KI). The objective of this project was to test the Plasma Pilot Plant capabilities in wood industry. The final goal of the project was to replace the current state-of-the-art, regenerative thermal oxidation (RTO) technology by Low-Temperature Plasma Technology (LTPT) in paper and wood industry for Volatile Organic Components (VOC) destruction in High Volume Low Concentration (HVLC) vent emissions. MetPro Corporation joined the team as an industrial partner from the environmental control business and a potential leader for commercialization. Concurrent Technology Corporation (CTC) has a separate contract with DOE for this technology evaluation. They prepared questionnaires for comparison of this technology and RTO, and made this comparison. These data are presented in this report along with the description of the technology itself. Experiments with the pilot plant were performed with average plasma power up to 3.6 kW. Different design of the laboratory and pilot plant pulsed coronas, as well as different analytical methods revealed many new peculiarities of the VOC abatement process. The work reported herein describes the experimental results for the VOCs removal efficiency with respect to energy consumption, residence time, water effect and initial concentration.

  14. Final Technical Report

    SciTech Connect (OSTI)

    Alexander Pigarov

    2012-06-05

    This is the final report for the Research Grant DE-FG02-08ER54989 'Edge Plasma Simulations in NSTX and CTF: Synergy of Lithium Coating, Non-Diffusive Anomalous Transport and Drifts'. The UCSD group including: A.Yu. Pigarov (PI), S.I. Krasheninnikov and R.D. Smirnov, was working on modeling of the impact of lithium coatings on edge plasma parameters in NSTX with the multi-species multi-fluid code UEDGE. The work was conducted in the following main areas: (i) improvements of UEDGE model for plasma-lithium interactions, (ii) understanding the physics of low-recycling divertor regime in NSTX caused by lithium pumping, (iii) study of synergistic effects with lithium coatings and non-diffusive ballooning-like cross-field transport, (iv) simulation of experimental multi-diagnostic data on edge plasma with lithium pumping in NSTX via self-consistent modeling of D-Li-C plasma with UEDGE, and (v) working-gas balance analysis. The accomplishments in these areas are given in the corresponding subsections in Section 2. Publications and presentations made under the Grant are listed in Section 3.

  15. Final Technical Report

    SciTech Connect (OSTI)

    Velasco, Mayda

    2013-11-01

    This work is focused on the design and construction of novel beam diagnostic and instrumentation for charged particle accelerators required for the next generation of linear colliders. Our main interest is in non-invasive techniques. The Northwestern group of Velasco has been a member of the CLIC Test Facility 3 (CTF3) collaboration since 2003, and the beam instrumentation work is developed mostly at this facility1. This 4 kW electron beam facility has a 25-170 MeV electron LINAC. CTF3 performed a set of dedicated measurements to finalize the development of our RF-Pickup bunch length detectors. The RF-pickup based on mixers was fully commissioned in 2009 and the RF-pickup based on diodes was finished in time for the 2010-11 data taking. The analysis of all the data taken in by the summer of 2010 was finish in time and presented at the main conference of the year, LINAC 2010 in Japan.

  16. Risk Management Process Overview

    Broader source: Energy.gov [DOE]

    The cybersecurity risk management process explained in the Electricity Sector Cybersecurity Risk Management Process (RMP) Guideline has two primary components: the risk management model and the the risk management cycle.

  17. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-12

    The purpose of this guide is to describe effective risk management processes. The continuous and iterative process includes updating project risk documents and the risk management plan and emphasizes implementation communication of the risks and actions taken.

  18. MTX final report

    SciTech Connect (OSTI)

    Hooper, E.B.; Allen, S.L.; Brown, M.D.; Byers, J.A.; Casper, T.A.; Cohen, B.I.; Cohen, R.H.; Fenstermacher, M.E.; Foote, J.H.; Hoshino, K.

    1994-01-01

    The MTX experiment was proposed in 1986 to apply high frequency microwaves generated by a free-electron laser (FEL) to electron cyclotron resonance heating (ECRH) in a high field, high density tokamak. As the absorption of microwaves at the electron cyclotron resonance requires high frequencies, the opportunity of applying a free-electron laser has appeal as the device is not limited to frequencies in the microwave or long millimeter wavelength regions, in contrast to many other sources. In addition, the FEL is inherently a high power source of microwaves, which would permit single units of 10 MW or more, optimum for reactors. Finally, it was recognized early in the study of the application of the FEL based on the induction linear accelerator, that the nonlinear effects associated with the intense pulses of microwaves naturally generated would offer several unique opportunities to apply ECRH to current drive, MHD control, and other plasma effects. It was consequently decided to adapt the induction accelerator based FEL to heating and controlling the tokamak, and to conduct experiments on the associated physics. To this end, the Alcator C tokamak was moved from the Massachusetts Institute of Technology (MIT) to the Lawrence Livermore National Laboratory where it was installed in Building 431 and operated from March, 1989, until the conclusion of the experiment in October, 1992. The FEL, based on the ETA-11 accelerator and IMP wiggler was brought into operation by the LLNL Electron Beam Group and power injected into the tokamak during an experimental run in the Fall, 1989. Following an upgrade by the MTX group, a second experimental run was made lasting from the Winter, 1992 through the end of the experiment. Significant contributions to the ECRH experiments were made by the Japan Atomic Energy Research Institute (JAERI).

  19. Microsoft PowerPoint -Risk_Portfolio_Manager(RPM)_overview_Under...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PowerPoint - RiskPortfolioManager(RPM)overviewUnderSecDOE2011V4 Final 3-22-2011.ppt Read-Only Compatibili Microsoft PowerPoint - RiskPortfolioManager(RPM)overviewUn...

  20. Agenda- Interagency Steering Committee on Performance and Risk Assessment Community of Practice Annual Technical Exchange Meeting

    Broader source: Energy.gov [DOE]

    Final Agenda for the December, 2014 Interagency Steering Committee on Performance and Risk Assessment Community of Practice Annual Technical Exchange Meeting held in Las Vegas, Nevada.

  1. Microsoft Word - ucd-doe-project-final-rept-31aug2012

    Office of Scientific and Technical Information (OSTI)

    ... Final Report To protect the SDN circuits, we needed the Shared Risk Link Group (SRLG) ... contributed to the development, packaging, and testing of OSCARS PCE SDK 0.6 software. ...

  2. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... administrative controls, worker training, industrial hygiene procedures, occupational medicine programs and oversight 2009-present" Final Meeting Summary Page 4 Health, Safety ...

  3. LIVE_NSB_final.wmv

    ScienceCinema (OSTI)

    None

    2010-09-01

    National Science Bowl finals and awards at the National Building Museum in Washington D.C. Monday 5/3/2010

  4. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    upcoming action and follow-up items. * Attachment 5: Tri-Party Agreement Agency Fiscal Year 2015 Work Plan- RAP-focused Topics1: Transcribed flipcharts Final Meeting...

  5. EA-1637: Final Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    10 CFR 431 Energy Conservation Program for Commerical and Industrial Equipment: Packaged Terminal Air Conditioner and Packaged Terminal Heat Pump Energy Conservation Standards; Final Rule

  6. Final_Testimony(26).pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    enable organizations to proactively manage risk. Ensuring the cyber security of a modern, digital electricity infrastructure is a key objective of national smart grid efforts. As a...

  7. Final Technical Report

    SciTech Connect (OSTI)

    Shayya, Walid

    2007-03-20

    interconnect with the power grid was approved by NYSEG (the electrical power provider) and the combined heat and power generation (CHP) system was authorized to start on February 27, 2007. The system has been in operation since February 28, 2007, and is generating 45 to 50 kW of electrical power on continuous basis. The completed project will ultimately allow for investigating the facility of utilizing organic waste from a dairy operation in a hard-top plug-flow methane digester with the ultimate goal of reducing environmental risk, increasing economic benefits, and demonstrating the viability of an anaerobic methane digestion system. Many benefits are expected as a result of the completed project including our better understanding of the anaerobic digestion process and its management as well as the facility to utilize the methane digester as a demonstration site for dairy producers, farmers, and organic waste producers in New York State and the Northeast. Additional benefits include helping current and future students in dairy science and technology, agricultural business, environmental sciences, agricultural engineering, and other disciplines develop better understanding of underutilized biomass alternative energy technologies, environmental conservation, environmental stewardship, and sustainable agriculture.

  8. Final ECR 2008 Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final ECR 2008 Report Final ECR 2008 Report Final ECR 2008 Report Environmental Conflict Resolution Third Annual Report January 2009 (224.55 KB) More Documents & Publications Environmental Conflict Resolution 2009 ECR FINAL REPORT 2010 test

  9. Final Technical Report

    SciTech Connect (OSTI)

    Stenzel, Reiner; Urrutia, J. Manuel

    2009-09-08

    emissions are only observed in whistler spheromaks and FRCs but not in mirrors or asymmetric configurations lacking magnetic null lines. The collisionless electron energization in a toroidal null line usually produces non-Maxwellian distributions. Off the null axis electrons gain more perpendicular than parallel energy. Distributions with T{sub {perpendicular}} > T{sub {parallel}} lead to whistler instabilities which have been observed. A whistler spheromak is a source of high-frequency whistler emissions. These are usually small amplitude whistlers propagating in a complicated background magnetic field. The waves are emitted from a moving source. High frequency whistlers propagate faster than the spheromak, thus partly move ahead of it and partly in the reverse direction. In test wave experiments wave growth opposite to the direction of the hot electron flow has been observed, confirming that Doppler-shifted cyclotron resonance instabilities account for the emission process. Propagating whistler mirrors produce no significant instabilities except when they interact with other fields which exhibit null lines. For example, a whistler mirror has been launched against a stationary FRC, resulting in strong FRC heating and whistler instabilities. In the whistler mirror configuration the antenna near-zone field produces a toroidal null line outside the coil which can also become a source for whistler emissions. Finally, nonlinear EMHD research has been extended to initially unmagnetized plasmas where a new nonlinear skin depth has been discovered. When a small-amplitude oscillating magnetic field is applied to a plasma the field penetration is governed by the skin depth, collisional or collisionless depending on frequency, collision frequency and plasma frequency. However, when the magnetic field increases the electrons become magnetized and the field penetration occurs in the whistler mode if the cyclotron frequency exceeds the oscillating frequency. This phenomenon has been

  10. EIS-0481: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Programmatic Environmental Impact Statement EIS-0481: Final Programmatic Environmental Impact Statement Engineered High Energy Crop Programs Programmatic Environmental ...

  11. Risk Assessment & Management Information

    Broader source: Energy.gov [DOE]

    NRC - A Proposed Risk Management Regulatory Framework, April 2012 Risk Assessment Technical Experts Working Group (RWG) web page DOE Standard on Development and Use of Probabilistic Risk Assessment in DOE Nuclear Safety Applications (draft), December 2010 Consortium for Risk Evaluation with Stakeholder Participation Workshop on Risk Assessment and Safety Decision Making Under Uncertainty

  12. Hawaii Clean Energy Final PEIS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A 1 2 Public Notices 3 Notices about the Draft Programmatic EIS Appendix A Hawai i Clean Energy Final PEIS A-1 September 2015 DOE/EIS-0459 The following Notice of Availability appeared in the Federal Register on April 18, 2014. Appendix A Hawai i Clean Energy Final PEIS A-2 September 2015 DOE/EIS-0459 Appendix A Hawai i Clean Energy Final PEIS A-3 September 2015 DOE/EIS-0459 DOE-Hawaii placed the following advertisement in The Garden Island on May 5 and 9, 2014. Appendix A Hawai i Clean Energy

  13. Role of LEPCs in risk management and risk communication

    SciTech Connect (OSTI)

    Mannan, M.

    1995-12-31

    Under Section 112(r) of Title III of the Clean Air Act Amendments, the US Environmental Protection Agency (EPA) is required to develop regulations that would require development and implementation of risk management programs at facilities that manufacture, process, use, store, or otherwise handle regulated substances in quantities that exceed specified threshold quantities. On January 31, 1994, EPA published the final rule establishing the List of Regulated Substances and Thresholds for Accidental Release Prevention. The proposed rule will require covered facilities to develop and implement a risk management program. The proposed rule will also require facilities to communicate various information to the local emergency planning committee (LEPC). This information may be provided in the form of consultation and communication during the development of various elements of the risk management program and/or by providing access to the risk management plan (RMP). These requirements not only place an additional regulatory burden on facilities but also create the need for the LEPCs to start planning for strategies to deal with significant amount of technical information in a meaningful and effective manner. This paper presents a summary of EPA`s proposed rule, the role of LEPCs in the implementation of many aspects of the rule, and a description of the potential contents of an RMP. Covered facilities as well as the LEPCs may gain a significant advantage by engaging in early dialogue and proactive education to determine mutual needs.

  14. Fuzzy Risk Analyzer

    Energy Science and Technology Software Center (OSTI)

    1994-03-04

    FRA is a general purpose code for risk analysis using fuzzy, not numeric, attributes. It allows the user to evaluate the risk associated with a composite system on the basis of the risk estimates of the individual components.

  15. Enterprise Risk Management Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Model The Enterprise Risk Management (ERM) Model is a system used to analyze the cost and benefit of addressing risks inherent in the work performed by the Department of Energy. This system measures risk using a combination of qualitative and quantitative methods to set a standard method for analyzing risk across the many functions within the department. Risks generally fall within five categories regardless ofthe subject matter ofthe subsystem. These categories are (1) risks to people, (2)

  16. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 18, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY, AND ENVIRONMENTAL PROTECTION COMMITTEE June 18, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tank Farm Vapors Advice Response ............................................................................................................ 1 Effectiveness of

  17. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 15, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE March 15, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Environmental Restoration and Disposal Facility Vertical Expansion ......................................................... 2 Committee Business

  18. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE April 12, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Public Involvement ..................................................................................................... 2 Waste Treatment and

  19. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 26, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE April 26, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Update on Plutonium Finishing Plant ........................................................................................................... 1 Leadership Workshop Preparation, FY 2017

  20. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 14, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE June 14, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Hanford Site Tour ......................................................................................................................................... 2 Status of SWOC/Rev. 9 and 8C.

  1. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 3, 2015 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE November 3, 2015 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Agency Public Involvement ....................................................................................... 2 Waste Treatment Plant

  2. Final Report: Axion "Roadmap" Workshop

    SciTech Connect (OSTI)

    Rosenberg, Leslie J

    2013-03-19

    Final report for "Vistas in Axion Physics: A Roadmap for Theoretical and Experimental Axion Physics through 2025", which was held at the University of Washington, INT, from April 23 - 26, 2012.

  3. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Grindstaff, DOE-ORP Ginger Wireman, Ecology Sharon Braswell, MSA Steve Pfaff, DOE-ORP Hillary Johnson, EnviroIssues Abby Chazanow, EnviroIssues Final Meeting Summary Page 16 Tank ...

  4. Enterprise Risk Management Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Framework The Enterprise Risk Management (ERM) framework includes four steps: identify the risks, determine the probability and impact of each one, identify controls that are...

  5. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    SciTech Connect (OSTI)

    Jones, M.E.; Shain, D.I.

    1994-05-01

    The Rocky Flats Plant is developing, with active stakeholder a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates. These postulated options or endstates can be various remedial alternatives, or future endstate uses of federal agency land. Currently, there does not exist any approved methodology that aggregates various incremental risk estimates. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges.

  6. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Participation Hanford Site-Wide Risk Review Project Interim Progress Report Pam Larson presented a draft letter 3 3 to the U.S. Department of Energy (DOE) recommending that ...

  7. FINAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information Systems » FIMS Data Validation FIMS Data Validation FIMS Data Validation The Facility Information Management System (FIMS) is the Department's official repository of real property data. The Department relies on the FIMS data for real property decision-making and accounting of its $86B in assets. Maintaining accurate and credible data in FIMS is critical to efficient operations and resource planning. Department of Energy Order 430.1B Real Property Asset Management requires FIMS data

  8. Final 2011 Supplement Analysis of the 2005 Final SWEIS | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Final 2011 Supplement Analysis of the 2005 Final SWEIS Final 2011 Supplement Analysis of the 2005 Final Site-wide Environmental Impact Statement for Continued Operation of LLNL The below final SUPPLEMENT ANALYSIS is available for public viewing. Final 2011 SUPPLEMENT ANALYSIS of the 2005 Final Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory Below are links to the final comments response and final

  9. Enterprise Risk Management Framework

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Framework The Enterprise Risk Management (ERM) framework includes four steps: identify the risks, determine the probability and impact of each one, identify controls that are already in place that mitigate that risk, and propose additional controls if needed. Step 1: Identify Risks - What can go wrong? This step should identify the negative outcomes that could result from an action or decision . It is important to consider a wide range of risks, and so the Department's ERM framework includes

  10. Final Design RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Design RM Final Design RM The Final Design (FD) Review Module (RM) is a tool that assists Department of Energy (DOE) federal project review teams in evaluating the technical ...

  11. Final Scientific/Technical Report

    SciTech Connect (OSTI)

    Dr. Michael Strasik

    2007-06-29

    Boeing Phantom Works and its team originally proposed a three-year Phase III SPI project to develop a 30-kWh flywheel with a 100 kW power capability as a power risk management system (RMS) for power users and providers. The chief objectives for the Risk Management System Flywheel were to (1) demonstrate its ability to protect a critical load such as a small data center from swings in power availability, cost, and power factor and (2) show that the RMS flywheel can perform these functions with reduced noise, emissions, and operating costs when compared with non-HTS competitors including batteries, diesel generators, and microturbines.

  12. MINIMARS conceptual design: Final report

    SciTech Connect (OSTI)

    Lee, J.D.

    1986-09-01

    This volume contains the following sections: (1) fueling systems; (2) blanket; (3) alternative blanket concepts; (4) halo scraper/direct converter system study and final conceptual design; (5) heat-transport and power-conversion systems; (6) tritium systems; (7) minimars air detritiation system; (8) appropriate radiological safety design criteria; and (9) cost estimate. (MOW)

  13. Final Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 15, 2016 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE March 15, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Waste Treatment Plant (WTP) Progress and Communication Approach (Joint w/PIC) .............................. 2 Issue Manager Update on Cesium Management Resulting from Low Activity Waste

  14. Microsoft Word - Abengoa Final EA

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    683 FINAL ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE TO ABENGOA SOLAR INC. FOR THE SOLANA THERMAL ELECTRIC POWER PROJECT NEAR GILA BEND, ARIZONA U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 May 2010 DOE/EA-1683 i CONTENTS Acronynms and Abbreviations ................................................................................................. viii SUMMARY

  15. Final Rule (October 23, 2007)

    Broader source: Energy.gov [DOE]

    Loan Guarantees for Projects That Employ Innovative Technologies; Final Rule: On May 16, 2007, the Department of Energy (DOE or the Department) published a Notice of Proposed Rulemaking and opportunity for comment (NOPR) to establish regulations for the loan guarantee program authorized by Title XVII of the Energy Policy Act of 2005 (Title XVII or the Act).

  16. Convective Radio Occultations Final Campaign Summary (Technical...

    Office of Scientific and Technical Information (OSTI)

    Convective Radio Occultations Final Campaign Summary Citation Details In-Document Search Title: Convective Radio Occultations Final Campaign Summary Deep convective systems are ...

  17. Biofuels Report Final | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biofuels Report Final Biofuels Report Final Liquid biofuels produced from lignocellulosic biomass can significantly reduce our dependence on foreign oil, create new jobs, improve ...

  18. EIS-0161: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  19. EIS-0229: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Programmatic Environmental Impact Statement EIS-0229: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  20. ERDA-1537: Final Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ERDA-1537: Final Environmental Impact Statement ERDA-1537: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on ...

  1. EIS-0269: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Programmatic Environmental Impact Statement EIS-0269: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain ...

  2. Ocean Thermal Extractable Energy Visualization: Final Technical...

    Office of Environmental Management (EM)

    Ocean Thermal Extractable Energy Visualization: Final Technical Report Ocean Thermal Extractable Energy Visualization: Final Technical Report Report about the Ocean Thermal ...

  3. Congressional Final House Final Senate Current Request Mark

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 FY 2010 FY 2010 FY 2010 ($ in thousands) Congressional Final House Final Senate Current Request Mark Mark Appropriation FOSSIL ENERGY R&D Coal 368,865 394,315 428,200 393,485 Natural Gas Technologies 25,000 25,000 25,000 17,364 Unconventional Fossil Energy Technologies 0 0 25,000 19,474 Program Direction 158,000 158,000 158,000 158,000 Plant & Capital Equipment 20,000 20,000 20,000 20,000 Environmental Restoration 10,000 10,000 10,000 10,000 Cooperative Res. & Development 0 0 5,000

  4. Expedited technology demonstration project final report: final forms

    SciTech Connect (OSTI)

    Hopper, R W

    1999-05-01

    ETDP Final Forms was an attempt to demonstrate the fabrication and performance of a ceramic waste form immobilizing the hazardous and radioactive elements of the MSO/SR mineral residues. The ceramic material had been developed previously. The fabrication system was constructed and functioned as designed except for the granulator. Fabrication of our particular ceramic, however, proved unsatisfactory. The ceramic material design was therefore changed toward the end of the project, replacing nepheline with zircon as the sink for silica. Preliminary results were encouraging, but more development is needed. Fabrication of the new ceramic requires major changes in the processing: Calcination and granulation would be replaced by spray drying; and sintering would be at higher temperature. The main goal of the project--demonstrating the fabrication and performance of the waste form--was not achieved. This report summarizes Final Forms' activities. The problem of immobilizing the MSO/SR mineral residues is discussed.

  5. Simulations of neutralized final focus

    SciTech Connect (OSTI)

    Welch, D.R.; Rose, D.V.; Genoni, T.C.; Yu, S.S.; Barnard, J.J.

    2005-01-18

    In order to drive an inertial fusion target or study high energy density physics with heavy ion beams, the beam radius must be focused to < 3 mm and the pulse length must be compressed to < 10 ns. The conventional scheme for temporal pulse compression makes use of an increasing ion velocity to compress the beam as it drifts and beam space charge to stagnate the compression before final focus. Beam compression in a neutralizing plasma does not require stagnation of the compression, enabling a more robust method. The final pulse shape at the target can be programmed by an applied velocity tilt. In this paper, neutralized drift compression is investigated. The sensitivity of the compression and focusing to beam momentum spread, plasma, and magnetic field conditions is studied with realistic driver examples. Using the 3D particle-in-cell code, we examine issues associated with self-field generation, stability, and vacuum-neutralized transport transition and focusing.

  6. A Phase 3 Trial of 2 Years of Androgen Suppression and Radiation Therapy With or Without Adjuvant Chemotherapy for High-Risk Prostate Cancer: Final Results of Radiation Therapy Oncology Group Phase 3 Randomized Trial NRG Oncology RTOG 9902

    SciTech Connect (OSTI)

    Rosenthal, Seth A.; Hunt, Daniel; Sartor, A. Oliver; Pienta, Kenneth J.; Gomella, Leonard; Grignon, David; Rajan, Raghu; Kerlin, Kevin J.; Jones, Christopher U.; Dobelbower, Michael; Shipley, William U.; Zeitzer, Kenneth; Hamstra, Daniel A.; Donavanik, Viroon; Rotman, Marvin; Hartford, Alan C.; Michalski, Jeffrey; Seider, Michael; Kim, Harold; and others

    2015-10-01

    Purpose: Long-term (LT) androgen suppression (AS) with radiation therapy (RT) is a standard treatment of high-risk, localized prostate cancer (PCa). Radiation Therapy Oncology Group 9902 was a randomized trial testing the hypothesis that adjuvant combination chemotherapy (CT) with paclitaxel, estramustine, and oral etoposide plus LT AS plus RT would improve overall survival (OS). Methods and Materials: Patients with high-risk PCa (prostate-specific antigen 20-100 ng/mL and Gleason score [GS] ≄7 or clinical stage ≄T2 and GS ≄8) were randomized to RT and AS (AS + RT) alone or with adjuvant CT (AS + RT + CT). CT was given as four 21-day cycles, delivered beginning 28 days after 70.2 Gy of RT. AS was given as luteinizing hormone-releasing hormone for 24 months, beginning 2 months before RT plus an oral antiandrogen for 4 months before and during RT. The study was designed based on a 6% improvement in OS from 79% to 85% at 5 years, with 90% power and a 2-sided alpha of 0.05. Results: A total of 397 patients (380 eligible) were randomized. The patients had high-risk PCa, 68% with GS 8 to 10 and 34% T3 to T4 tumors, and median prostate-specific antigen of 22.6 ng/mL. The median follow-up period was 9.2 years. The trial closed early because of excess thromboembolic toxicity in the CT arm. The 10-year results for all randomized patients revealed no significant difference between the AS + RT and AS + RT + CT arms in OS (65% vs 63%; P=.81), biochemical failure (58% vs 54%; P=.82), local progression (11% vs 7%; P=.09), distant metastases (16% vs 14%; P=.42), or disease-free survival (22% vs 26%; P=.61). Conclusions: NRG Oncology RTOG 9902 showed no significant differences in OS, biochemical failure, local progression, distant metastases, or disease-free survival with the addition of adjuvant CT to LT AS + RT. The trial results provide valuable data regarding the natural history of high-risk PCa treated with LT AS + RT and have implications for

  7. Final DOE Areas Feasibility Study

    Office of Legacy Management (LM)

    Management, Washington, DC Weiss Associates Environmental Science, Engineering and Management FINAL DOE AREAS FEASIBILITY STUDY for the: LABORATORY FOR ENERGY-RELATED HEALTH RESEARCH UNIVERSITY OF CALIFORNIA, DAVIS Prepared for: SM Stoller Corporation 2597 B Ÿ Road Grand Junction, Colorado 81503 Prepared by: Weiss Associates 5801 Christie Avenue, Suite 600 Emeryville, California 94608-1827 March 07, 2008 Rev. 0 J:\DOE_STOLLER\4110\143\FEASIBILITY_STUDY\20080307_FS_TEXT_REV0.DOC WEISS ASSOCIATES

  8. State Energy Risk Assessment Initiative - State Energy Risk Profiles...

    Energy Savers [EERE]

    Mission Energy Infrastructure Modeling and Analysis State Energy Risk Assessment Initiative - State Energy Risk Profiles State Energy Risk Assessment Initiative - State...

  9. Topographical Risk Assessment

    Energy Science and Technology Software Center (OSTI)

    2002-09-24

    TRA was developed as a computer tool for the DOE Office of River Protection (ORP) that will provides the capability to visualize and rapidly understand information about the risks associated with the River protection Project (RPP). Previously, technical and programmatic risk management within ORP had relied heavily on risk lists and other techniques that presented risk information but did not place it in perspective of the overall project. This made it difficult for ORP seniormore » management to understand the risk information presented, prioritize their activities, and provide direction to ORP staff and contractors about how to manage specific risk events. The TRA visualization tool, provides the appropriate context and perspective that allows senior management to effectively manage risks. Basically, the TRA overlays information about risks associated with specific activities and their magnitudes on top of the project baseline schedule. this provides senior management with information about the magnitudes of specific risk events as well as their timing, and allows them to focus their attention and resources on the risks that merit attention and possible further action. The TRA tool can also be used to display other types of information associated with scheduled activities, such as cost to date, technical performance, schedule performance, etc. Additionally, the base of the 3-dimensional representation can be changed to other types of graphics, such as maps, process flow diagrams, etc., which allows the display of other types of informatio, such as hazards, health and safety risks, and system availability.« less

  10. Microsoft Word - 20140617 Water Energy Nexus 1030pm FINAL.docx

    Broader source: Energy.gov (indexed) [DOE]

    | Department of Energy WH Energy and Climate Stakeholders 10-7-09 final.ppt (1.78 MB) More Documents & Publications Microsoft PowerPoint - CHU_Grid Week 9-21-09 final.ppt Microsoft PowerPoint - 5.3 Item 01 Top Kill Operation Status 09 June 1400.pptx Microsoft PowerPoint - Enterprise Top Hat Phases - 07-04-2010.pptx

    Building the Community of Practice for Performance and Risk Assessment in Support of Risk-Informed Environmental Management Decisions - 14575 WM2014 Conference Phoenix, AZ,

  11. DOE Issues Landmark Rule for Risk Insurance for Advanced Nuclear Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Landmark Rule for Risk Insurance for Advanced Nuclear Facilities DOE Issues Landmark Rule for Risk Insurance for Advanced Nuclear Facilities May 8, 2006 - 10:36am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) issued on Saturday, the interim final rule required by the Energy Policy Act of 2005 (EPACT) for risk insurance to facilitate construction of new advanced nuclear power facilities. The rule establishes the requirements for risk insurance to cover

  12. Final Information Quality Bulletin for Peer Review | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Information Quality Bulletin for Peer Review Final Information Quality Bulletin for Peer Review Final Information Quality Bulletin for Peer Review PDF icon Final Information ...

  13. SPECIAL REREVIEW FINAL DETERMINATION UNCLASSIFIED

    Office of Legacy Management (LM)

    SPECIAL REREVIEW FINAL DETERMINATION UNCLASSIFIED , ?4~0180N SctuAnr P. 0. 00x *a STATION F New YORK, N. Y. IN RLPLY RCFSRTO EID?f A- 43 MS ~-7405 eng-8 ". Subject: Contract No.H-7405 eng-8 with Metal Hydrides Incorporated. MEMORAhDUM to the Files. 1. Reference is made to basi.c communication dated 27 September 1945, Symbol No. EIDM 1%-30-b, requesting certain information with respect to the subject contract. 2. Reference pars,?-raph a. The Government committed to restore Contractor's plant

  14. Hanford_FinalReport_20140130

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy Hanford workers begin cleaning out historic McCluskey Room Hanford workers begin cleaning out historic McCluskey Room Addthis Description Workers have entered one of the most hazardous rooms at the Hanford Site in Washington state to begin final cleanup of a room that became known to workers over the years by the name of a worker injured there in a Cold War-era accident. The first reentry on Monday, September 8, 2014, consisted mostly surveying the room. More information:

  15. Final Rule (December 4, 2009)

    Broader source: Energy.gov [DOE]

    Loan Guarantees for Projects that Employ Innovative Technologies: On October 23, 2007, the Department of Energy published a final rule establishing regulations for the loan guarantee program authorized by Section 1703 of Title XVII of the Energy Policy Act of 2005. Section 1703 of Title XVII authorizes the Secretary of Energy to make loan guarantees for projects that “avoid, reduce, or sequester air pollutants or anthropogenic emissions of greenhouse gases; and employ new or significantly improved technologies as compared to commercial technologies in service in the United States at the time the guarantee is issued.”

  16. Field practice internship final report

    SciTech Connect (OSTI)

    Foster, T.

    1994-05-01

    This field practice internship final report gives an overview of the field practice, which was completed at the Oak Ridge Y-12 Plant, Martin Marietta Energy Systems, Inc., Environmental Management Department, Oak Ridge, Tennessee. The field practice focused on the completion of the Superfund Amendments and Reauthorization Act (SARA) Title III, Emergency Planning and Community Right-to-Know Act Section 312, Tier II Report. The field practice internship was conducted on a full-time basis between December 13, 1993 through February 18, 1994. Sheila Poligone, Emergency Planning and Community Right-to-Know Act (EPCRA) Coordinator served as the field practice preceptor.

  17. Hydroprocessing SRC. Final technical report

    SciTech Connect (OSTI)

    Bronfenbrenner, J.C.; Garg, D.; Harris, C.F.; Znaimer, S.

    1983-09-01

    Catalyst activity and aging rate were studied in ICRC's process development unit (PDU) and at the Wilsonville Advanced Coal Liquefaction Facility under SRC-I Demonstration Plant hydroprocessing conditions. Similar studies using both high- and low-conversion modes were conducted by The Lummus Company. The studies determined variations in SRC conversion, hydrocarbon gas production, hydrogen consumption, and heteroatom removal. Samples of spent catalyst were analyzed to ascertain the reasons for catalyst deactivation. Finally, the ICRC PDU hydroprocessing results were compared with those generated at Lummus and Wilsonville pilot plants.

  18. Microsoft Word - REPORT.13.final

    Office of Scientific and Technical Information (OSTI)

    Grantee The George Washington University Department of Chemistry 725 21 st St., NW Corcoran Hall Washington, DC 20052 Grant Number DE-FG02-02ER15366 Project Title Interface Induced Carbonate Mineralization: A Fundamental Geochemical Process Relevant to Carbon Sequestration P/I Dr. H. Henry Teng 202-994-0112 hteng@gwu.edu Co-PI Dr. Huifang Xu Dept. Geoscience University of Wisconsin-Madison 1215 W Dayton St Madison, WI 53706 FINAL REPORT Background Vast majority of literature work concludes that

  19. Virtualized Network Control. Final Report

    SciTech Connect (OSTI)

    Ghani, Nasir

    2013-02-01

    This document is the final report for the Virtualized Network Control (VNC) project, which was funded by the United States Department of Energy (DOE) Office of Science. This project was also informally referred to as Advanced Resource Computation for Hybrid Service and TOpology NEtworks (ARCHSTONE). This report provides a summary of the project's activities, tasks, deliverable, and accomplishments. It also provides a summary of the documents, software, and presentations generated as part of this projects activities. Namely, the Appendix contains an archive of the deliverables, documents, and presentations generated a part of this project.

  20. [Experimental nuclear physics]. Final report

    SciTech Connect (OSTI)

    1991-04-01

    This is the final report of the Nuclear Physics Laboratory of the University of Washington on work supported in part by US Department of Energy contract DE-AC06-81ER40048. It contains chapters on giant dipole resonances in excited nuclei, nucleus-nucleus reactions, astrophysics, polarization in nuclear reactions, fundamental symmetries and interactions, accelerator mass spectrometry (AMS), ultra-relativistic heavy ions, medium energy reactions, work by external users, instrumentation, accelerators and ion sources, and computer systems. An appendix lists Laboratory personnel, a Ph. D. degree granted in the 1990-1991 academic year, and publications. Refs., 41 figs., 7 tabs.

  1. Risk and Realities | Jefferson Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    » Risk Management Process Overview Risk Management Process Overview figure depicting three tier risk management process The cybersecurity risk management process explained in the Electricity Sector Cybersecurity Risk Management Process (RMP) Guideline has two primary components: the risk management model and the the risk management cycle. The risk management model reflects the organization as a three-tiered structure and provides a comprehensive view for the electricity sector organization and

  2. ReACT Methodology Proof of Concept Final Report

    SciTech Connect (OSTI)

    Bri Rolston; Sarah Freeman

    2014-03-01

    The Department of Energy’s Office of Electricity Delivery and Energy Reliability (DOE-OE) funded INL Researchers to evaluate a novel process for assessing and mitigating cyber security risks. The proof of concept level of the method was tested in an industry environment. This case study, plus additional case studies will support the further development of the method into a tool to assist industry in securing their critical networks. This report provides an understanding of the process developed in the Response Analysis and Characterization Tool (ReACT) project. This report concludes with lessons learned and a roadmap for final development of these tools for use by industry.

  3. Secretary Bodman Announces Federal Risk Insurance for Nuclear Power Plants

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Touts Robust Economy | Department of Energy Federal Risk Insurance for Nuclear Power Plants & Touts Robust Economy Secretary Bodman Announces Federal Risk Insurance for Nuclear Power Plants & Touts Robust Economy August 4, 2006 - 8:42am Addthis ATLANTA, GA - After touring Georgia Power and speaking to its employees, U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced completion of the final rule that establishes the process for utility companies building

  4. Ozone Risk Assessment Utilities

    Energy Science and Technology Software Center (OSTI)

    1999-08-10

    ORAMUS is a user-friendly, menu-driven software system that calculates and displays user-selected risk estimates for health effects attributable to short-term exposure to tropospheric ozone. Inputs to the risk assessment are estimates of exposure to ozone and exposure-response relationships to produce overall risk estimates in the form of probability distributions. Three fundamental models are included: headcount risk, benchmark risk, and hospital admissions. Exposure-response relationships are based on results of controlled human exposure studies. Exposure estimates aremore » based on the EPA''s probabilistic national ambient air quality standards (NAAQS) exposure model, pNEM/Osub3, which simulates air quality associated with attainment of alternative NAAQS. Using ORAMUS, risk results for 27 air quality scenarios, air quality in 9 urban areas, 33 health endpoints, and 4 chronic health endpoints can be calculated.« less

  5. Sociocultural definitions of risk

    SciTech Connect (OSTI)

    Rayner, S.

    1990-10-01

    Public constituencies frequently are criticized by technical experts as being irrational in response to low-probability risks. This presentation argued that most people are concerned with a variety of risk attributes other than probability and that is rather irrational to exclude these from the definition and analysis of technological risk. Risk communication, which is at the heart of the right-to-know concept, is described as the creation of shared meaning rather than the mere transmission of information. A case study of utilities, public utility commissions, and public interest groups illustrates how the diversity of institutional cultures in modern society leads to problems for the creation of shared meanings in establishing trust, distributing liability, and obtaining consent to risk. This holistic approach to risk analysis is most appropriate under conditions of high uncertainty and/or decision stakes. 1 fig., 5 tabs.

  6. A risk assessment software tool for evaluating potential risks to human health and the environment

    SciTech Connect (OSTI)

    Drendel, G.; Allen, B.; Gentry, R.; Shipp, A.; Van Landingham, C.

    1994-12-31

    The Ecology and National Environmental Policy Act Division (END), is providing a sitewide evaluation of alternative strategies for the final disposition of the Rocky Flats Plant material inventory. This analysis is known as the Systems Engineering Analysis (SEA) for the Rocky Flats Plant. The primary intent of the SEA is to support the Rocky Flats Plant decision-making. As part of the SEA project, a risk assessment software tool has been developed which will assist in the analysis by providing an evaluation of potential risks to human health and the environment for the purpose of augmenting future decisions at the site.

  7. Risk Identification and Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Identification and Assessment [Sections in brackets are for instructions; these should be deleted or replaced with specifics in the template.] Subsystem Title or Section within Subsystem [In the first column, using short bullets, fill in "what can go wrong," or a brief description of a potential benefit from a program or action. Add additional rows as necessary. Fill in the other columns using the rating guidelines in the attached reference pages.] |Risk|Probability|Impact|Risk

  8. Enterprise Risk Management Specialist

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration, Corporate Services Office, Office of the Chief Operating Officer, Risk and...

  9. GDB - Human Genome Database final report

    SciTech Connect (OSTI)

    Talbot, C. Conover, Jr.

    2002-01-08

    This is the DOE final report for the GDB, Human Genome Database, project at the Johns Hopkins University.

  10. Microsoft Word - FINAL_TECHNICAL_REPORT.doc

    Office of Scientific and Technical Information (OSTI)

    ......... 27 Figure 16 Comparison between simulation and experimental results: (a) Top view of final simulated inclusion locations. ...

  11. Final Uranium Leasing Program Programmatic Environmental Impact...

    Energy Savers [EERE]

    Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) Final Uranium Leasing Program Programmatic Environmental Impact Statement (PEIS) Uranium Leasing ...

  12. Fort Polk EEAP. Final report

    SciTech Connect (OSTI)

    Busch, R.D.; Scheuch, K.E.; Shishman, T.T.

    1986-07-17

    This Final Presentation provides a summary of the work done under Increments A, B, E, and G of the Energy Engineering Analysis Program (EEAP) for Fort Polk Louisiana. The work was accomplished under Contract DACA63-80-C-0166 plus modifications with the Fort Worth District, Corps of Engineers. The vast majority of consumed energy at Fort Polk consists of electricity and natural gas. In FY75, Fort Polk used 48,399,000 kWh of electricity at a cost of $600,000. During that same period, 782,637 MCF of natural gas was purchased for $484,000. The total FY75 energy use was 1,368,327 MBtu.

  13. Strategic Asia 2002 Final Report

    SciTech Connect (OSTI)

    Richard Ellings; Aaron Friedberg; Michael Wills

    2002-09-01

    The Strategic Asia Program made considerable progress over the course of 2002--the program's first year with support from the Department of Energy--and completed all its tasks on schedule and within budget. Following a planning meeting in Washington in February 2002, a team of leading specialists wrote a series of original assessments regarding the impact of September 11 on the strategic environment in Asia, examining how perceptions and strategies of countries in the region changed following the terrorist attacks. The final products, Strategic Asia 2002-03: Asian Aftershocks and its accompanying executive summary, were published in September 2002. The program's research findings (some of which are summarized) were presented to policymakers in Washington and elsewhere throughout the year, and almost 2,000 copies of the book had been distributed by mid-2003.

  14. CCSTF - Final Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CCSTF - Final Report CCSTF - Final Report Carbon Capture and Storage Task Force - Final Report (2.08 MB) More Documents & Publications Before the Subcommittee on Energy -- House Science, Space, and Technology Committee Before the House Energy and Commerce Subcommittee on Oversight and Investigations CCS Task Force - Executive Summary

  15. 2009 ECR FINAL REPORT 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 PDF icon 2009 ECR Report More Documents & Publications test Final ECR...

  16. In-Situ Radiation Detection Demonstration Final Report

    SciTech Connect (OSTI)

    MOHAGHEGHI,AMIR H.; REESE,ROBERT; MILLER,DAVID R.; MILLER,MARK LAVERNE; DUCE,STEPHEN

    2000-06-01

    The Department of Defense (DoD) has hundreds of facilities where radioactive materials have been used or are being used, including firing ranges, low-level radioactive waste disposal areas, and areas where past activities have resulted in environmental contamination. Affected sites range in size from a few acres to square miles. Impact to the DoD comes through military base closure and release to the public. It is important that radioactive contaminants are remediated to levels that result in acceptable risk to the public. Remediation requires characterization studies, e.g., sampling and surveys, to define the affected areas, removal actions, and final confirmatory sampling and surveys. Characterization of surface contamination concentrations has historically been performed using extensive soil sampling programs in conjunction with surface radiation surveys conducted with hand-held radiation monitoring equipment. Sampling is required within the suspect affected area and a large buffer area. Surface soil contaminant characterization using soil sampling and hand held monitoring are costly, time consuming, and result in long delays between submission of samples for analysis and obtaining of final results. This project took an existing, proven radiation survey technology that has had limited exposure and improved its capabilities by documenting correlation factors for various detector/radionuclide geometries that commonly occur in field surveys. With this tool, one can perform characterization and final release surveys much more quickly than is currently possible, and have detection limits that are as good as or better than current technology. This paper will discuss the capabilities of a large area plastic scintillation detector used in conjunction with a global positioning system (GPS) to improve site characterization, remediation, and final clearance surveys of the radioactively contaminated site. Survey results can rapidly identify areas that require remediation as

  17. FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE MEETING

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2011 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE MEETING February 16, 2011 Richland, WA Topics in this Meeting Summary Welcome and Introductions .......................................................................................................................... 1 River Corridor Baseline Risk Assessment Plan ............................................................................................ 2 Update on Building 324 - B Cell Contamination

  18. IRIS Final Technical Progress Report

    SciTech Connect (OSTI)

    M. D. Carelli

    2003-11-03

    OAK-B135 This NERI project, originally started as the Secure Transportable Autonomous Light Water Reactor (STAR-LW) and currently known as the International Reactor Innovative and Secure (IRIS) project, had the objective of investigating a novel type of water-cooled reactor to satisfy the Generation IV goals: fuel cycle sustainability, enhanced reliability and safety, and improved economics. The research objectives over the three-year (1999-2002) program were as follows: First year: Assess various design alternatives and establish main characteristics of a point design; Second year: Perform feasibility and engineering assessment of the selected design solutions; Third year: Complete reactor design and performance evaluation, including cost assessment These objectives were fully attained and actually they served to launch IRIS as a full fledged project for eventual commercial deployment. The program did not terminate in 2002 at the end of the NERI program, and has just entered in its fifth year. This has been made possible by the IRIS project participants which have grown from the original four member, two-countries team to the current twenty members, nine countries consortium. All the consortium members work under their own funding and it is estimated that the value of their in-kind contributions over the life of the project has been of the order of $30M. Currently, approximately 100 people worldwide are involved in the project. A very important constituency of the IRIS project is the academia: 7 universities from four countries are members of the consortium and five more US universities are associated via parallel NERI programs. To date, 97 students have worked or are working on IRIS; 59 IRIS-related graduate theses have been prepared or are in preparation, and 41 of these students have already graduated with M.S. (33) or Ph.D. (8) degrees. This ''final'' report (final only as far as the NERI program is concerned) summarizes the work performed in the first four

  19. Assessment of the risk of transporting liquid chlorine by rail

    SciTech Connect (OSTI)

    Andrews, W.B.

    1980-03-01

    This report presents the risk of shipping liquid chlorine by rail. While chlorine is not an energy material, there are several benefits to studying chlorine transportation risks. First, chlorine, like energy materials, is widely used as a feedstock to industry. Second, it is the major purification agent in municipal water treatment systems and therefore, provides direct benefits to the public. Finally, other risk assessments have been completed for liquid chlorine shipments in the US and Europe, which provide a basis for comparison with this study. None of the previous PNL energy material risk assessments have had other studies for comparison. For these reasons, it was felt that a risk assessment of chlorine transportation by rail could provide information on chlorine risk levels, identify ways to reduce these risks and use previous studies on chlorine risks to assess the strengths and weaknesses of the PNL risk assessment methodology. The risk assessment methodology used in this study is summarized. The methodology is presented in the form of a risk assessment model which is constructed for ease of periodic updating of the data base so that the risk may be reevaluated as additional data become available. The report is sectioned to correspond to specific analysis steps identified in the model. The transport system and accident environment are described. The response of the transport system to accident environments is described. Release sequences are postulated and evaluated to determine both the likelihood and possible consequences of a release. Supportive data and analyses are given in the appendices. The risk assessment results are related to the year 1985 to allow a direct comparison with other reports in this series.

  20. Recognizing and Assigning ESPC Risks and Responsibilities Using the Risk,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Responsibility, and Performance Matrix | Department of Energy Recognizing and Assigning ESPC Risks and Responsibilities Using the Risk, Responsibility, and Performance Matrix Recognizing and Assigning ESPC Risks and Responsibilities Using the Risk, Responsibility, and Performance Matrix Document offers guidance on how to recognize and assign energy savings performance contract (ESPC) risks and responsibilities using the risk, responsibility, and performance matrix, also known as RRPM.

  1. Bio Risk Assessment Tool

    Energy Science and Technology Software Center (OSTI)

    2004-07-22

    The Biosecurity Risk Assessment Tool (BRAT) is a new type of computer application for the screening-level assessment of risk to dairy operations. BRAT for Dairies is designed to be intuitive and easy to use. Users enter basic data-property address, feed management, employee population, and so on - into the interface. Using these data and rules found in an expert system. BRAT for Dairies consults appropriate sections of its database. The expert system determines the riskmore » implications of the basic data, e.g. diseases are closely tied to pen location with respect to the outside world, When the analysis is complete, BRAT for Dairies evaluates and allocates the risk for each hazard, ranks the risks, and displays the results graphically.« less

  2. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-18

    This Guide provides non-mandatory risk management approaches for implementing the requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. Supersedes DOE G 413.3-7.

  3. Comparative risk analysis for the Rocky Flats Plant Integrated Project Planning

    SciTech Connect (OSTI)

    Jones, M.E.; Shain, D.I.

    1994-12-31

    The Rocky Flats Plant is developing a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risk from postulated options or endstates. Comparative Risk Analysis is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remedial options or future endstates. It addresses the cumulative risks imposed by the Rocky Flats Plant and provides risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures. Currently, there is no approved methodology that aggregates various risk estimates. Along with academic and field expert review, the Comparative Risk Analysis methodology is being reviewed and refined. A Rocky Flats Plant Risk Assessment Focus Group was established. Stakeholder involvement in the development provides an opportunity to influence the information delivered to a decision-maker. This paper discusses development of the methodology.

  4. Notice of Final Rulemaking | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Rulemaking Notice of Final Rulemaking Revisions to U.S. Department of Energy (DOE) regulations governing compliance with the National Environmental Policy Act (NEPA) were published in the Federal Register on October 13, 2011, and will be effective on November 14. The revision (76 FR 63763) can be viewed using the link below. Final Rule - 76 FR 63763 - Oct 13 2011_0.pdf (297.74 KB) More Documents & Publications Department of Energy Technical Support Document National Environmental

  5. Hawaii Clean Energy Final PEIS Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    HAWAI'I CLEAN ENERGY FINAL PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT SUMMARY U.S. DEPARTMENT OF ENERGY Office of Electricity Delivery and Energy Reliability Office of Energy Efficiency and Renewable Energy (DOE/EIS-0459) SEPTEMBER 2015 COVER SHEET TITLE: Hawai i Clean Energy Final Programmatic Environmental Impact Statement (Final PEIS) RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE), Offices of Electricity Delivery and Energy Reliability (OE) and Energy Efficiency and Renewable

  6. Risk in the Weapons Stockpile

    SciTech Connect (OSTI)

    Noone, Bailey C

    2012-08-14

    When it comes to the nuclear weapons stockpile, risk must be as low as possible. Design and care to keep the stockpile healthy involves all aspects of risk management. Design diversity is a method that helps to mitigate risk.

  7. Shortwave Hyperspectral Observations During MAGIC Final Campaign...

    Office of Scientific and Technical Information (OSTI)

    Title: Shortwave Hyperspectral Observations During MAGIC Final Campaign Summary The Marine ARM GPCI1 Investigation of Clouds (MAGIC) field campaign was initiated to improve our ...

  8. Final Rule Technical Amendment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Rule Technical Amendment Federal Register Announcement: The Department of Energy (DOE) is publishing this technical amendment to the regulations for the loan guarantee ...

  9. EIS-0083: Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Final Northeast Regional Environmental Impact Statement; The Potential Conversion of Forty-Two Powerplants From Oil to Coal or Alternate Fuels

  10. Bureau of Land Management - Final Programmatic Environmental...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Report: Bureau of Land Management - Final Programmatic Environmental Impact Statement for Geothermal Leasing in the...

  11. EIS-0472: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0472: Final Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado This EIS evaluated the environmental impacts ...

  12. Final Report - Hydrogen Delivery Infrastructure Options Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Hydrogen Delivery Infrastructure Options Analysis Final Report - Hydrogen Delivery Infrastructure Options Analysis This report, by the Nexant team, documents an in-depth analysis ...

  13. Final Conservation Billing Credit Policy Supplement Background...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Customers subject to I-937 must acquire conservation independent of BPA's conservation acquisition efforts. In 2007, as BPA was finalizing its Regional Dialogue Policy, several...

  14. EA-1212-SA-01: Final Supplement Analysis

    Broader source: Energy.gov [DOE]

    Final Supplement Analysis for the Environmental Assessment for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory

  15. Final Report - Montana State University - Microbial Activity...

    Office of Scientific and Technical Information (OSTI)

    Media Citation Details In-Document Search Title: Final Report - Montana State University - Microbial Activity and Precipitation at Solution-Solution Mixing Zones in Porous Media ...

  16. Hawaii Clean Energy Final PEIS Summary

    Broader source: Energy.gov (indexed) [DOE]

    HAWAI'I CLEAN ENERGY FINAL PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT SUMMARY U.S. DEPARTMENT OF ENERGY Office of Electricity Delivery and Energy Reliability Office of Energy ...

  17. Final Report - Developing Solar Friendly Communities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report - Developing Solar Friendly Communities Awardee: Colorado Solar Energy Industry Association Location: Boulder, CO Subprogram: Soft Costs Funding Program: Rooftop Solar ...

  18. Final Report - Improved Large Aperture Collector Manufacturing...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report - Improved Large Aperture Collector Manufacturing Awardee: Abengoa Solar Location: Lakewood, CO Subprogram: Concentrating Solar Power, Technology to Market Funding ...

  19. Technical Assessment Team Issues Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2015 Technical Assessment Team Issues Final Report This week the Department of Energy's Technical Assessment Team (TAT) visited Carlsbad and met with federal and contractor staff ...

  20. CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Attached is Acquisition Letter 2013-07, which provides suggested modification language. (The Final Rule's revisions are administrative in nature. Regarding costs contractors have ...

  1. Final Technical Report on Radioxenon Event Analysis

    SciTech Connect (OSTI)

    Ely, James H.; Cooper, Matthew W.; Hayes, James C.; Heimbigner, Tom R.; McIntyre, Justin I.; Schrom, Brian T.

    2013-03-15

    This is a final deliverable report for the Advanced Spectral Analysis for Radioxenon project with a focus on radioxenon event categorization.

  2. EA-1535: Final Programmatic Environmental Assessment | Department...

    Energy Savers [EERE]

    EA-1535: Final Programmatic Environmental Assessment Uranium Leasing Program Office of Legacy Management (LM) is evaluating its Uranium Leasing Program to determine a strategy for ...

  3. Clark Public Utilities Impact Evaluation Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Clark Public Utilities Impact Evaluation Final Report - July 2015 - Home Energy Reports Memorandum 1375 Walnut Street Suite 200 Boulder, CO 80302 303-728-2500 To: Lauren Gage...

  4. Community Power Works Final Report and Conclusions

    SciTech Connect (OSTI)

    Baumel, Christie

    2015-03-09

    This is the final technical report for the City of Seattle's Community Power Works program, funded through the US DOE Better Buildings grant program.

  5. Paducah Gaseous Diffusion Plant Final Environmental Assessment...

    Energy Savers [EERE]

    Point of contact for more information: Robert Smith, Department of Energy-Paducah Paducah Gaseous Diffusion Plant Final Environmental Assessment for Potential Land and Facilities ...

  6. Electric chiller handbook. Final report

    SciTech Connect (OSTI)

    1998-02-01

    that electric chillers are preferable to gas chillers in the large majority of applications, consistent with current market trends. Furthermore, today`s chillers offer a wide range of efficiencies and refrigerant options to serve cooling system needs for the 20-year lifetime of the chiller. Finally, new higher-efficiency models of electric chillers offer very attractive paybacks.

  7. Santa Barbara Final Technical Report

    SciTech Connect (OSTI)

    Hacker, Angela; Hansen, Sherman; Watkins, Ashley

    2013-11-30

    This report serves as the Final Report for Santa Barbara County’s Energy Efficiency and Conservation Block Grant (EECBG) BetterBuildings Neighborhood Program (BBNP) award from the U.S. Department of Energy (DOE). This report explains how DOE BBNP funding was invested to develop robust program infrastructure designed to help property owners complete energy improvements, thereby generating substantial outcomes for the local environment and economy. It provides an overview of program development and design within the grant period, program accomplishments and challenges to date, and a plan for the future sustainability of emPower, the County’s innovative clean energy and building efficiency program. During the grant period, Santa Barbara County’s emPower program primarily targeted 32,000 owner occupied, single family, detached residential homes over 25 years old within the County. In order to help these homeowners and their contractors overcome market barriers to completing residential energy improvements, the program developed and promoted six voluntary, market-based service areas: 1) low cost residential financing (loan loss reserve with two local credit unions), 2) residential rebates, 3) local customer service, 4) expert energy advising, 5) workforce development and training, and 6) marketing, education and outreach. The main goals of the program were to lower building energy use, create jobs and develop a lasting regional building performance market. These services have generated important early outcomes and lessons after the program’s first two years in service. The DOE BBNP funding was extended through October 2014 to enable Santa Barbara County to generate continued outcomes. In fact, funding related to residential financing remains wholly available for the foreseeable future to continue offering Home Upgrade Loans to approximately 1,300 homeowners. The County’s investment of DOE BBNP funding was used to build a lasting, effective, and innovative

  8. Final report on SNAC 11

    SciTech Connect (OSTI)

    Huber, Patrick

    2013-06-26

    This report details how the $5,000 DOE grant to support the workshop titled “Sterile Neutrinos at the Crossroads” (or SNAC11) was allocated and spent. The SNAC11 workshop covered three days during which there were 28 talks, multiple discussion sessions, a poster session with 9 posters delivered, and an impromptu public lecture on the OPERA superluminal neutrino result by the former project manager of OPERA (this was the first official OPERA talk on the subject in North America). The workshop scientific agenda can be viewed at http://www.cpe.vt.edu/snac/program.html. Emerging out of the workshop discussions, was the idea to write a comprehensive white paper describing the current state of the light sterile neutrino. This effort soon became an international collaboration. The final document, titled “Light Sterile Neutrinos: A White Paper” has nearly 200 authors, is 267 pages long, and cites 730 unique references. It has been posted the preprint archive as arXiv:1204.5379 [hep-ph]. Workshop local organizing committee co-chairs, Patrick Huber and Jonathan Link, are the white paper’s head editors. The white paper’s sections and section editors are as follows: 1. Theory and Motivation (Gabriela Barenboim, Valencia and Werner Rodejohann, MPI Heidelberg) 2. Astrophysical Evidence (Kev Abazajian, UC Irvine and Yvonne Wong, Aachen) 3. Evidence from Oscillation Experiments (Joachim Kopp, FNAL and Bill Louis, LANL) 4. Global Picture (Thierry Lasserre, CEA Saclay and Thomas Schwetz, MPI Heidelberg) 5. Requirements for Future Measurements (Bonnie Fleming, Yale and Joe Formaggio, MIT) 6. Appendix: Possible Future Experiments (Patrick Huber, Virginia Tech and Jon Link, Virginia Tech) In all 56 people participated in the workshop, of these 11 were young scientists. The workshop was covered in a feature article in Science (Science, 334, (2011), 304-306.). The DOE award was spent, as budgeted, as contractual services to VT CPE, which is the unit within the University which organizes

  9. Final Report Package_Winnebago

    SciTech Connect (OSTI)

    Carolyn Stewart, Director, Red Mountain Energy Partners

    2006-10-31

    The Winnebago Tribe of Nebraska energy options study results will be used to advance the Tribe’s near term energy management objectives. The array of energy options identified allows the Tribe to select those activities that best fit its energy strategies, goals and objectives. During the course of the study, Red Mountain analyzed both energy options and energy organizational alternatives suitable for the Tribe, presented findings to the Tribal Council, and made recommendations regarding each. Work products delivered to the Tribe, and provided in the Final Report included: • A matrix of energy management options applicable to the Tribe, which provided descriptions of particular conservation, efficiency, weatherization, and demand management alternatives. The matrix also provided insight about relative costs of the alternatives, cost/benefit efficacy, ease of implementation, resources for implementing, and observations about each. • A matrix of utility service options applicable to the Tribe, describing each of the four alternatives described above. The matrix also provided insight about key benefits of each option, required resources, costs and timeframe for implementation, funding sources and analysis, and key issues for consideration. • Discussion guides prepared for each meeting between the Energy Committee and Council, and the Tribe’s contractor, Red Mountain Energy Partners, which included preliminary analysis and findings. • A Position Description for the Energy Manager position, which was reviewed by the Tribal HR Department, and used by the Tribe to develop a position posting. • A Utility Code designed for Winnebago to use in establishing its Utility Board, and, ultimately, to provide guidance for the Board’s further development. • A project summary book developed to include all key information, deliverables and utility provider data for the project. Winnebago’s growth trends and expansion plans require the Tribe to play a more active role in assuring that

  10. FINAL CLOSE-OUT REPORT

    SciTech Connect (OSTI)

    Mark A. Carl

    2004-08-03

    The Interstate Oil and Gas Compact Commission (IOGCC) engaged in numerous projects outlined under the scope of work discussed in the United States Department of Energy (DOE) grant number DE-FG26-01BC15336 awarded to the IOGCC. Numerous projects were completed that were extremely valuable to state oil and gas agencies as a result of work performed utilizing resources provided by the grant. There are numerous areas in which state agencies still need assistance. This additional assistance will need to be addressed under another grant because funding resources have been exhausted under The scope of work objectives for the eight projects covered under this grant is as follows: (1) Improve uniformity within state oil and gas data management efforts. (2) Conduct environmental compliance workshops and related educational projects on natural gas and oil exploration and production. (3) Improve regulatory efficiency through partnering opportunities provided by the Appalachian Illinois Basin Directors. (4) Promote the development and implementation of risk-based environmental regulation at the state level through an expertise-sharing program that brings stakeholders together to develop guidelines and models to meet regulatory challenges. (5) Support the IOGCC's regulatory streamlining efforts, including the identification and elimination of unnecessary duplications of effort between state and federal programs dealing with exploration and production on public lands, and identify the need to enhance and regionalize regulatory coordination and cooperation among the states. (6) Involve states and provinces of Canada that have offshore petroleum exploration and production in a regulatory sharing alliance to identify areas of concern that may be incorporated into standard practices for offshore environmental and regulatory compliance. (7) Coordinate efforts with the U.S. Environmental Protection Agency (EPA) to ensure that adequate information is available to the public regarding

  11. EIS-0440: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0440: Final Environmental Impact Statement Quartzsite Solar Energy Project The Final Environmental Impact Statement (FEIS) consists of a ...

  12. EIS-0290: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0290: Final Environmental Impact Statement Advanced Mixed Waste Treatment Project (AMWTP) The AMWTP Final EIS assesses the potential ...

  13. EIS-0407: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0407: Final Environmental Impact Statement ... The Final Abengoa Biorefinery Project EIS evaluates the potential direct, indirect, and ...

  14. EIS-0496: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0496: Final Environmental Impact Statement San ... and state lead agencies, issued a final EISEnvironmental Impact Report that assesses ...

  15. EIS-0336: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0336: Final Environmental Impact Statement Tucson ... The Final EIS will be used by DOE and the Federal agency officials to ensure that they ...

  16. EIS-0271: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0271: Final Environmental Impact Statement ... This EIS is linked to the Final Programmatic Environmental Impact Statement for Tritium ...

  17. EIS-0370: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0370: Final Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document EIS-0370: Final Environmental Impact Statement ...

  18. EIS-0089: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Impact Statement EIS-0089: Final Environmental Impact Statement ... The final environmental impact statement (EIS) consists of the draft EIS and the Addendum ...

  19. EIS-0447: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0447: Final Environmental Impact Statement DOE prepared this Final EIS to evaluate the potential environmental impacts of a DOE proposal to ...

  20. EIS-0102: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    83 Wholesale Power Rate EIS-0102: Final Environmental Impact Statement More Documents & Publications EIS-0071: Final Environmental Impact Statement EIS-0202: Final Environmental...

  1. EIS-0306: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0306: Final Environmental Impact Statement Treatment and Management of Sodium-Bonded Spent Nuclear Fuel DOE prepared a Final EIS that...

  2. Evaluation of the Better Buildings Neighborhood Program, Final...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation of the Better Buildings Neighborhood Program, Final Synthesis Report, Volume 1 Final Report: Evaluation of the Better Buildings Neighborhood Program, Final Synthesis ...

  3. Microsoft PowerPoint - Tsinghua Slideshow final for distribution...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tsinghua Slideshow final for distribution (2) Microsoft PowerPoint - Tsinghua Slideshow final for distribution (2) PDF icon Microsoft PowerPoint - Tsinghua Slideshow final for ...

  4. Microsoft PowerPoint - Final translated version of Tsinghua Speech...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final translated version of Tsinghua Speech Microsoft PowerPoint - Final translated version of Tsinghua Speech PDF icon Microsoft PowerPoint - Final translated version of Tsinghua ...

  5. Microsoft Word - FINAL Materials Strategy Request for Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FINAL Materials Strategy Request for Information May 5 2010 Microsoft Word - FINAL Materials Strategy Request for Information May 5 2010 PDF icon Microsoft Word - FINAL Materials ...

  6. EA-1979: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1979: Final Environmental Assessment Summit Wind Farm; Summit, South Dakota Western Area Power Administration (Western) issued a final EA that ...

  7. EA-1728: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1728: Final Environmental Assessment Final Environmental Assessment for Integrated Vegetation Management of the Hanford Site, Richland, WA This EA...

  8. EIS-0337: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0337: Final Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Final West Valley ...

  9. Supplemental Analysis for the Final Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final ...

  10. EA-1818: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Assessment EA-1818: Final Environmental Assessment Pettisville ... More Documents & Publications EA-1818: Finding of No Significant Impact EA-1820: Final ...

  11. EA-1008: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1008: Final Environmental Assessment EA-1008: Final Environmental Assessment Continued ... Environmental Assessment EA-1236: Finding of No Significant Impact EA-1956: Final

  12. EIS-0312: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0312: Final Environmental Impact Statement Fish and Wildlife Implementation Plan In this final environmental impact statement (FEIS), with...

  13. Step by Step Instruction - ICR - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Step by Step Instruction - ICR - FINAL Step by Step Instruction - ICR - FINAL Step by Step Instructions-ICR-final.doc (31 KB) More Documents & Publications Information Collection ...

  14. EA-1984: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1984: Final Environmental Assessment Disposition of Five Signature Properties at Idaho National Laboratory This Final EA evaluates the impacts of...

  15. The Enterprise Risk Management Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Enterprise Risk Management Model Using the Risk Assessment Tool to Prepare a Justification Memorandum for the Development and Revision of Departmental Directives * On January 14,...

  16. Microsoft Word - CCE_Final_Rule_02-07-11 _Final Word_.docx | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy CCE_Final_Rule_02-07-11 _Final Word_.docx Microsoft Word - CCE_Final_Rule_02-07-11 _Final Word_.docx Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and Commercial and Industrial Equipment Microsoft Word - CCE_Final_Rule_02-07-11 _Final Word_.docx (962.39 KB) More Documents & Publications Federal Register Vol. 76 No. 44, 12422-12505 - Energy Conservation Program: Certification, Compliance, and Enforcement for Consumer Products and

  17. Final_Groundwater_flowchart_June07.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    risk to human health and the environment. * Highest benefi cial use is protective of all human health, ecosystems and Native American treaty rights. Hanford Advisory Board -...

  18. Risk Management Process Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Risk Management Process Overview Risk Management Process Overview figure depicting three tier risk management process The cybersecurity risk management process explained in the ...

  19. NAABB Full Final Report Section I

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    REPORT SECTION I FULL FINAL REPORT SECTION I FULL FINAL REPORT SECTION I Program Overview Table of Contents Executive Summary ........................................................................................ iv Synopsis .......................................................................................................... 1 Perspective 1. NAABB was Preceded by the Aquatic Species Program ................ 29 Perspective 2. NAABB and the National Research Council Report on Sustainable

  20. Risk communications and the Chemical Stockpile Emergency-Planning Program

    SciTech Connect (OSTI)

    Vogt, B.M.; Sorensen, J.H.

    1994-09-01

    The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

  1. 2009 ECR FINAL REPORT 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 2009 ECR FINAL REPORT 2010 2009 ECR Report (510.91 KB) More Documents & Publications test Final ECR 2008 Report Environmental Conflict Resolution

  2. CSS Letter - Final.tif | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CSS Letter - Final.tif CSS Letter - Final.tif CSS Letter - Final.tif (138.9 KB) More Documents & Publications CSS Letter - Final.tif NAHB_RequestandResponse.pdf

  3. CSS Letter - Final.tif | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CSS Letter - Final.tif CSS Letter - Final.tif CSS Letter - Final.tif (138.97 KB) More Documents & Publications CSS Letter - Final.tif NAHB_RequestandResponse.pdf

  4. Biosafety Risk Assessment Model

    Energy Science and Technology Software Center (OSTI)

    2011-05-27

    Software tool based on a structured methodology for conducting laboratory biosafety risk assessments by biosafety experts. Software is based upon an MCDA scheme and uses peer reviewed criteria and weights. The software was developed upon Microsoft’s .net framework. The methodology defines likelihood and consequence of a laboratory exposure for thirteen unique scenarios and provides numerical relative risks for each of the relevant thirteen. The software produces 2-d graphs reflecting the relative risk and a sensitivitymore » analysis which highlights the overall importance of each factor. The software works as a set of questions with absolute scales and uses a weighted additive model to calculate the likelihood and consequence.« less

  5. Aguirre Offshore GasPort Project Final Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... the feasibility and risk of installing the ... risks and identified strategies for managing potential risks. ... the need for a safety zone around the ...

  6. EA-1974: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1974: Final Environmental Assessment Wallooskee-Youngs Confluence Restoration Project; Clatsop County, Oregon Bonneville Power Administration ...

  7. EIS-0097: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Impact Statement EIS-0097: Final Environmental Impact Statement Bonneville Power Administration Transmission Facilities Vegetation Management Program The ...

  8. EA-1611-S1: Final Supplemental Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado DOE's Western Area Power Administration issued a final supplemental...

  9. Improving the safety of LWR power plants. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-04-01

    This report documents the results of the Study to identify current, potential research issues and efforts for improving the safety of Light Water Reactor (LWR) power plants. This final report describes the work accomplished, the results obtained, the problem areas, and the recommended solutions. Specifically, for each of the issues identified in this report for improving the safety of LWR power plants, a description is provided in detail of the safety significance, the current status (including information sources, status of technical knowledge, problem solution and current activities), and the suggestions for further research and development. Further, the issues are ranked for action into high, medium, and low priority with respect to primarily (a) improved safety (e.g. potential reduction in public risk and occupational exposure), and secondly (b) reduction in safety-related costs (improving or maintaining level of safety with simpler systems or in a more cost-effective manner).

  10. Sitewide risk perspectives for the Rocky Flats Environmental Technology Site

    SciTech Connect (OSTI)

    Olinger, S.J.; Foppe, T.L.

    1998-05-01

    The US Department of Energy (DOE) has recently finalized a closure plan (originally called the Ten Year Plan) for closure and environmental cleanup of previous nuclear weapons facilities. The DOE Rocky Flats Field Office has established priorities for risk reduction work to Support closure activities, as well as addressing those hazards associated with storage and management of radioactive materials and hazardous chemicals. To provide information for future National Environmental Policy Act (NEPA) or other regulatory assessments of specific risk reduction projects identified in the Closure Plan, a risk assessment of normal operations and potential accidents was recently prepared to provide an updated baseline of the cumulative impacts to the worker, public and environment due to the Site`s operations, activities, and environmental conditions in light of the Site`s change in mission, and of future closure projects. This paper summarizes the risk assessment approach, results, and conclusions.

  11. Resources for global risk assessment: The International Toxicity Estimates for Risk (ITER) and Risk Information Exchange (RiskIE) databases

    SciTech Connect (OSTI)

    Wullenweber, Andrea Kroner, Oliver; Kohrman, Melissa; Maier, Andrew; Dourson, Michael; Rak, Andrew; Wexler, Philip; Tomljanovic, Chuck

    2008-11-15

    The rate of chemical synthesis and use has outpaced the development of risk values and the resolution of risk assessment methodology questions. In addition, available risk values derived by different organizations may vary due to scientific judgments, mission of the organization, or use of more recently published data. Further, each organization derives values for a unique chemical list so it can be challenging to locate data on a given chemical. Two Internet resources are available to address these issues. First, the International Toxicity Estimates for Risk (ITER) database ( (www.tera.org/iter)) provides chronic human health risk assessment data from a variety of organizations worldwide in a side-by-side format, explains differences in risk values derived by different organizations, and links directly to each organization's website for more detailed information. It is also the only database that includes risk information from independent parties whose risk values have undergone independent peer review. Second, the Risk Information Exchange (RiskIE) is a database of in progress chemical risk assessment work, and includes non-chemical information related to human health risk assessment, such as training modules, white papers and risk documents. RiskIE is available at (http://www.allianceforrisk.org/RiskIE.htm), and will join ITER on National Library of Medicine's TOXNET ( (http://toxnet.nlm.nih.gov/)). Together, ITER and RiskIE provide risk assessors essential tools for easily identifying and comparing available risk data, for sharing in progress assessments, and for enhancing interaction among risk assessment groups to decrease duplication of effort and to harmonize risk assessment procedures across organizations.

  12. NGNP Risk Management Database: A Model for Managing Risk

    SciTech Connect (OSTI)

    John Collins; John M. Beck

    2011-11-01

    The Next Generation Nuclear Plant (NGNP) Risk Management System (RMS) is a database used to maintain the project risk register. The RMS also maps risk reduction activities to specific identified risks. Further functionality of the RMS includes mapping reactor suppliers Design Data Needs (DDNs) to risk reduction tasks and mapping Phenomena Identification Ranking Table (PIRTs) to associated risks. This document outlines the basic instructions on how to use the RMS. This document constitutes Revision 1 of the NGNP Risk Management Database: A Model for Managing Risk. It incorporates the latest enhancements to the RMS. The enhancements include six new custom views of risk data - Impact/Consequence, Tasks by Project Phase, Tasks by Status, Tasks by Project Phase/Status, Tasks by Impact/WBS, and Tasks by Phase/Impact/WBS.

  13. Health risks in perspective: Judging health risks of energy technologies

    SciTech Connect (OSTI)

    Rowe, M.D.

    1992-09-18

    Almost daily, Americans receive reports from the mass news media about some new and frightening risk to health and welfare. Most such reports emphasize the newsworthiness of the risks -- the possibility of a crisis, disagreements among experts, how things happened, who is responsible for fixing them, how much will it cost, conflict among parties involved, etc. As a rule, the magnitudes of the risks, or the difficulty of estimating those magnitudes, have limited newsworthiness, and so they are not mentioned. Because of this emphasis in the news media, most people outside the risk assessment community must judge the relative significance of the various risks to which we all are exposed with only that information deemed newsworthy by reporters. This information is biased and shows risks in isolation. There is no basis for understanding and comparing the relative importance of risks among themselves, or for comparing one risk, perhaps a new or newly-discovered one, in the field of all risks. The purpose of this report is to provide perspective on the various risks to which we are routinely exposed. It serves as a basis for understanding the meaning of quantitative risk estimates and for comparing new or newly-discovered risks with other, better-understood risks. Specific emphasis is placed on health risks of energy technologies.

  14. Risk Assessment/Management Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    RAMTool performs the following: • A tool to perform facility and programmatic risk assessments, produce risk registers, develop risk management plans (RMPs), link risks to improvement/risk-reduction projects, and actively manage risks • Ability to conduct risk assessments. Ease of determination of probability and consequence based on industry standard risk matrices. Complies with site risk management performance document. Provides multiple outputs/report for required risk forms. Conduct quick risk data analysis. • Performs/calculates a facility risk factormore » (RF) and a programmatic RF. Supports project and initiative prioritization and funding in order to make solid decisions on risk reduction. Assigns responsibility and accountability at a risk owner (RO) level. Monitors and tracks progress toward completing mitigation strategies. Ability to import massive amounts of data at the push of a button. Integrates development of a Risk Management Plan (RMP) Built for ease-of-use – design, built, and used by technical/management personnel. Can be customized (functions and/or reports) for further analysis« less

  15. Basic theory and methods of dosimetry for use in risk assessment of genotoxic chemicals. Final report

    SciTech Connect (OSTI)

    Ehrenberg, L.; Granath, F.

    1992-12-31

    This project is designed to be theoretical, with limited experimental input. The work then would have to be directed towards an identification of problems, with an emphasis on the potential ability of molecular/biochemical methods to reach a solution, rather than aiming at solutions of the problems. In addition, the work is dependent on experimental work within parallel projects. Initially, projects running at this laboratory were strongly tied up with practical matters, such as the development of monitoring methods for specific exposures, with limited resources for basic research. As sketched in the scientific report below, section 4 the meaningfulness of molecular/biochemical methods and their potential contribution to the problem of dsk estimation has to be seen against a broad overview of this problem and current efforts to solve it. This overview, given as a brief summary in section 3, shows the necessity of combining different fields of research, holding them together by strictly quantitative aspects.

  16. Risk Management Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-16

    This Guide provides a framework for identifying and managing key technical, schedule, and cost risks through applying the requirements of DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, dated 7-28-06. Canceled by DOE G 413.3-7A, dated 1-12-11. Does not cancel other directives.

  17. EIS-0386: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0386: Final Programmatic Environmental Impact Statement Designation of Energy Corridors on Federal Land in the 11 Western States EIS-0386-FEIS-Summary-2008.pdf (2.33 MB) ...

  18. EIS-0403: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in ... in Six Southwestern States (4.31 MB) EIS-0403-Comments-on-Supp-to-Solar-DEIS--20001-...

  19. Research in High Energy Physics. Final report

    SciTech Connect (OSTI)

    Conway, John S.

    2013-08-09

    This final report details the work done from January 2010 until April 2013 in the area of experimental and theoretical high energy particle physics and cosmology at the University of California, Davis.

  20. Data Network Weather Service Reporting - Final Report

    SciTech Connect (OSTI)

    Michael Frey

    2012-08-30

    A final report is made of a three-year effort to develop a new forecasting paradigm for computer network performance. This effort was made in co-ordination with Fermi Lab's construction of e-Weather Center.

  1. Norcal Prototype LNG Truck Fleet: Final Results

    SciTech Connect (OSTI)

    Not Available

    2004-07-01

    U.S. DOE and National Renewable Energy Laboratory evaluated Norcal Waste Systems liquefied natural gas (LNG) waste transfer trucks. Trucks had prototype Cummins Westport ISXG engines. Report gives final evaluation results.

  2. Final Information Quality Bulletin for Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    04 OFFICE OF MANAGEMENT AND BUDGET Final Information Quality Bulletin for Peer Review INTRODUCTION This Bulletin establishes that important scientific information shall be peer reviewed by qualified specialists before it is disseminated by the federal government. We published a proposed Bulletin on September 15, 2003. Based on public comments, we published a revised proposal for additional comment on April 28, 2004. We are now finalizing the April version, with minor revisions responsive to the

  3. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    SciTech Connect (OSTI)

    Jones, M.E.; Shain, D.I.

    1994-12-31

    The Rocky Flats Plant is developing, with active stakeholder participation, a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Final disposition of the Rocky Flats Plant materials and contaminants requires consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition. Comparative risk analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or end states. These postulated options or end states can be various remedial alternatives, or future endstate uses of federal land.

  4. Multi-agency radiation survey and site investigation manual (MARSIM). Final report

    SciTech Connect (OSTI)

    1997-12-01

    The MARSSIM provides information on planning, conducting, evaluating, and documenting building surface and surface soil final status radiological surveys for demonstrating compliance with dose or risk-based regulations or standards. The MARSSIM is a multi-agency consensus document that was developed collaboratively by four Federal agencies having authority and control over radioactive materials: Department of Defense (DOD), Department of Energy (DOE), Environmental Protection Agency (EPA), and Nuclear Regulatory Commission (NRC). The MARSSIM`s objective is to describe a consistent approach for planning, performing, and assessing building surface and surface soil final status surveys to meet established dose or risk-based release criteria, while at the same time encouraging an effective use of resources.

  5. CPR_RemedialAction_flowchart_final.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    characterize site STOP no further action needed No Yes Is development successful? 4b No Yes Is it appropriate to invest time and money in new treatment technologies? (consider risk) 4a Yes No Are treatment technologies available? 4 Yes No Are retrieval technologies available? 3 Yes No Does the waste site require action? (consider risk) 2 Has the waste site been adequately characterized? 1 Yes No Yes No Are disposal alternatives available? 5 Yes No Are retrieval, treatment and disposal

  6. Quantitative Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear

  7. Probabilistic Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced Nuclear

  8. Security Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Risk Assessment - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced

  9. Rebaselining seismic risks for resumption of Building 707 plutonium operations at the Rocky Flats Plant

    SciTech Connect (OSTI)

    Elia, F. Jr.; Foppe, T.; Stahlnecker, E.

    1993-08-01

    Natural phenomena risks have been assessed for plutonium handling facilities at the Rocky Flats Plant, based on numerous studies performed for the Department of Energy Natural Phenomena Hazards Project. The risk assessment was originally utilized in the facilities Final Safety Analysis Reports and in subsequent risk management decisions. Plutonium production operations were curtailed in 1989 in order for a new operating contractor to implement safety improvements. Since natural phenomena events dominated risks to the public, a re-assessment of these events were undertaken for resumption of plutonium operations.

  10. Risk assessment handbook

    SciTech Connect (OSTI)

    Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

    1990-09-01

    The Probabilistic Risk Assessment Unit at EG G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers' needs and the product have been established.

  11. Risk assessment handbook

    SciTech Connect (OSTI)

    Farmer, F.G.; Jones, J.L.; Hunt, R.N.; Roush, M.L.; Wierman, T.E.

    1990-09-01

    The Probabilistic Risk Assessment Unit at EG&G Idaho has developed this handbook to provide guidance to a facility manager exploring the potential benefit to be gained by performance of a risk assessment properly scoped to meet local needs. This document is designed to help the manager control the resources expended commensurate with the risks being managed and to assure that the products can be used programmatically to support future needs in order to derive maximum beneflt from the resources expended. We present a logical and functional mapping scheme between several discrete phases of project definition to ensure that a potential customer, working with an analyst, is able to define the areas of interest and that appropriate methods are employed in the analysis. In addition the handbook is written to provide a high-level perspective for the analyst. Previously, the needed information was either scattered or existed only in the minds of experienced analysts. By compiling this information and exploring the breadth of knowledge which exists within the members of the PRA Unit, the functional relationships between the customers` needs and the product have been established.

  12. Supervisory Loan Specialist (Strategic Risk)

    Broader source: Energy.gov [DOE]

    This position is located in the Department of Energy (DOE) Loans Programs Office (LPO), Risk Management Division (RMD or LP-40) Strategic Risk Group (LP-40). The incumbent is the supervisor for the...

  13. Risk communication in environmental assessment

    SciTech Connect (OSTI)

    Rahm-Crites, L.

    1996-08-26

    Since the enactment of NEPA and other environmental legislation, the concept of `risk communication` has expanded from simply providing citizens with scientific information about risk to exploring ways of making risk information genuinely meaningful to the public and facilitating public involvement in the very processes whereby risk is analyzed and managed. Contemporary risk communication efforts attempt to find more effective ways of conveying increasingly complex risk information and to develop more democratic and proactive approaches to community involvement, in particular to ensuring the participation of diverse populations in risk decisions. Although considerable progress has been made in a relatively short time, risk communication researchers and practitioners currently face a number of challenges in a time of high expectations, low trust, and low budgets.

  14. Budget Risk & Prioritization Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    BRPAtool performs the following: ?Assists managers in making solid decisions on what scope/activities to reduce and/or eliminate, to meet constrained budgets, based on multiple risk factors ?Enables analysis of different budget scenarios ?Can analyze risks and cost for each activity based on technical, quantifiable risk criteria and management-determined risks ?Real-time analysis ?Enables managers to determine the multipliers and where funding is best applied ?Promotes solid budget defense

  15. CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: FINAL RULE

    Broader source: Energy.gov [DOE]

    The Department has issued a Final Rule revising the existing contractor regulations covering contractor legal management requirements at 10 C.F.R. 719 (Federal Register May 3, 2013; http://www.gpo.gov/fdsys/pkg/FR-2013-05-03/pdf/2013-10485.pdf). One unusual aspect of the Final Rule is that it requires Contracting Officers to attempt to execute bilateral modifications to existing affected contracts to apply the Final Rule's revisions to those contracts. We will issue an Acquisition Letter shortly with suggested contract modification language. (The Final Rule's revisions "
 are designed to clarify and streamline existing requirements, improve efficiency of contractor legal management, and facilitate oversight over the expenditure of taxpayer dollars." The contract modifications will state the revisions will only apply to costs incurred from date the bilateral modifications are executed forward. The revisions are administrative in nature. Regarding costs contractors have not yet incurred, the revisions could have been communicated to contractors without using a Final Rule to incorporate them into current contracts. Consequently, the modifications do not require equitable adjustments.)

  16. EIS-0018: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Impact Statement EIS-0018: Final Environmental Impact Statement Continued Operation of Los Alamos Scientific Laboratory Site, Los Alamos, New Mexico EIS-0018: Final Environmental Impact Statement (11.84 MB) More Documents & Publications EIS-0085-S: Final Environmental Impact Statement EIS-0098: Draft Environmental Impact Statement EIS-0098: Final

  17. 60 Day Federal Register Notice Extension - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension - FINAL 60 Day Federal Register Notice Extension - FINAL 60 Day Federal Register Notice Extension-Final.pdf (13.96 KB) More Documents & Publications 30 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Proposed - FINAL

  18. 60 Day Federal Register Notice Proposed - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed - FINAL 60 Day Federal Register Notice Proposed - FINAL 60 Day Federal Register Notice Proposed-Final.pdf (13.26 KB) More Documents & Publications 30 Day Federal Register Notice Proposed - FINAL 60 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed

  19. Assessment of health risks of policies

    SciTech Connect (OSTI)

    Ádåm, Balåzs; Molnår, Ágnes; Ádåny, Róza; Bianchi, Fabrizio; Bitenc, Katarina; Chereches, Razvan; Cori, Liliana; Fehr, Rainer; Kobza, Joanna; Kollarova, Jana; and others

    2014-09-15

    The assessment of health risks of policies is an inevitable, although challenging prerequisite for the inclusion of health considerations in political decision making. The aim of our project was to develop a so far missing methodological guide for the assessment of the complex impact structure of policies. The guide was developed in a consensual way based on experiences gathered during the assessment of specific national policies selected by the partners of an EU project. Methodological considerations were discussed and summarized in workshops and pilot tested on the EU Health Strategy for finalization. The combined tool, which includes a textual guidance and a checklist, follows the top-down approach, that is, it guides the analysis of causal chains from the policy through related health determinants and risk factors to health outcomes. The tool discusses the most important practical issues of assessment by impact level. It emphasises the transparent identification and prioritisation of factors, the consideration of the feasibility of exposure and outcome assessment with special focus on quantification. The developed guide provides useful methodological instructions for the comprehensive assessment of health risks of policies that can be effectively used in the health impact assessment of policy proposals. - Highlights: ‱ Methodological guide for the assessment of health risks of policies is introduced. ‱ The tool is developed based on the experiences from several case studies. ‱ The combined tool consists of a textual guidance and a checklist. ‱ The top-down approach is followed through the levels of the full impact chain. ‱ The guide provides assistance for the health impact assessment of policy proposals.

  20. Risk perception in developing countries

    SciTech Connect (OSTI)

    Wilbanks, T.J.; Rayner, S.F.

    1985-02-15

    The paper briefly reviews: (1) what risk perception means to most people in developing countries; (2) some of the modern-technology-related risks to which people in these countries are exposed; and (3) some research evidence about risk perception that gives hints about how such perceptions will evolve in developing countries. (ACR)

  1. Regulatory cost-risk study

    SciTech Connect (OSTI)

    Not Available

    1983-04-01

    This study is intended to provide some quantitative perspective by selecting certain examples of criteria for which estimates of risks and costs can be obtained, and the balance of the various risks, (i.e., internal versus external risks), can be put into perspective. 35 refs., 39 tabs. (JDB)

  2. NGNP Risk Management Database: A Model for Managing Risk

    SciTech Connect (OSTI)

    John Collins

    2009-09-01

    To facilitate the implementation of the Risk Management Plan, the Next Generation Nuclear Plant (NGNP) Project has developed and employed an analytical software tool called the NGNP Risk Management System (RMS). A relational database developed in Microsoftź Access, the RMS provides conventional database utility including data maintenance, archiving, configuration control, and query ability. Additionally, the tool’s design provides a number of unique capabilities specifically designed to facilitate the development and execution of activities outlined in the Risk Management Plan. Specifically, the RMS provides the capability to establish the risk baseline, document and analyze the risk reduction plan, track the current risk reduction status, organize risks by reference configuration system, subsystem, and component (SSC) and Area, and increase the level of NGNP decision making.

  3. 2007 Wholesale Power Rate Case Final Proposal : Market Price Forecast Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-07-01

    This study presents BPA's market price forecasts for the Final Proposal, which are based on AURORA modeling. AURORA calculates the variable cost of the marginal resource in a competitively priced energy market. In competitive market pricing, the marginal cost of production is equivalent to the market-clearing price. Market-clearing prices are important factors for informing BPA's power rates. AURORA was used as the primary tool for (a) estimating the forward price for the IOU REP Settlement benefits calculation for fiscal years (FY) 2008 and 2009, (b) estimating the uncertainty surrounding DSI payments and IOU REP Settlements benefits, (c) informing the secondary revenue forecast and (d) providing a price input used for the risk analysis. For information about the calculation of the secondary revenues, uncertainty regarding the IOU REP Settlement benefits and DSI payment uncertainty, and the risk run, see Risk Analysis Study WP-07-FS-BPA-04.

  4. UPS CNG Truck Fleet Final Report

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Âź Âź Âź Âź Âź Âź Âź Clean Air Natural Gas Vehicle This is a Clean Air Natural Gas Vehicle This is a UPS CNG Truck Fleet UPS CNG Truck Fleet UPS CNG Truck Fleet Final results Final Results Produced for the U.S. Department of Energy (DOE) by the National Renewable Energy Laboratory (NREL), a DOE national laboratory Alternative Fuel Trucks DOE/NREL Truck Evaluation Project By Kevin Chandler, Battelle Kevin Walkowicz, National Renewable Energy Laboratory Nigel Clark, West Virginia University

  5. Photovoltaic Degradation Risk: Preprint

    SciTech Connect (OSTI)

    Jordan, D. C.; Kurtz, S. R.

    2012-04-01

    The ability to accurately predict power delivery over the course of time is of vital importance to the growth of the photovoltaic (PV) industry. Important cost drivers include the efficiency with which sunlight is converted into power, how this relationship changes over time, and the uncertainty in this prediction. An accurate quantification of power decline over time, also known as degradation rate, is essential to all stakeholders - utility companies, integrators, investors, and researchers alike. In this paper we use a statistical approach based on historical data to quantify degradation rates, discern trends and quantify risks related to measurement uncertainties, number of measurements and methodologies.

  6. Eastern European risk management

    SciTech Connect (OSTI)

    Honey, J.A. )

    1992-01-01

    Here the authors assess Eastern European risk management practices through the evaluation of the nuclear power plants in the region. This evaluation is limited to the Soviet-designed and -built VVER-440 pressurized water reactors (PWRs) that are currently operating in Bulgaria, Czechoslovakia, Hungary, Russia, and the Ukraine and until recently operated at Greifswald in the former East Germany. This evaluation is based on the basic design of the plants, a safety evaluation of the Greifswald facility by representatives from the Federal Republic of Germany and personal visits by the author to Greifswald and Loviisa.

  7. Compliance & Risk Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    environmental hazards and risks to protect human health and safety and the environment. ... Plans. Risk evaluation tools such as the Human Health and Ecological Risk Methods ...

  8. Energy Conservation Program: Final Rule; Test Procedures for...

    Office of Environmental Management (EM)

    Final Rule; Test Procedures for Ceiling Fans Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans Ceiling Fans TP FinalRule (601.19 KB) More Documents & ...

  9. EIS-0015: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Impact Statement EIS-0015: Final Environmental Impact Statement U.S. Spent Fuel Policy EIS-0015: Final Environmental Impact Statement, volume 1 (1.45 MB) ...

  10. Microsoft Word - NationalPolicyAssurancesAwardTermsFinal81804...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NationalPolicyAssurancesAwardTermsFinal81804.doc Microsoft Word - NationalPolicyAssurancesAwardTermsFinal81804.doc PDF icon Microsoft Word - NationalPolicyAssurancesAwardTermsFinal...

  11. Microsoft Word - acqguide18pt0 March 2011 final | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    acqguide18pt0 March 2011 final Microsoft Word - acqguide18pt0 March 2011 final Microsoft Word - acqguide18pt0 March 2011 final More Documents & Publications Chapter 18 - Emergency...

  12. Agenda_2015 APM Workshop_Final | Department of Energy

    Office of Environmental Management (EM)

    Agenda2015 APM WorkshopFinal Agenda2015 APM WorkshopFinal Agenda2015 APM WorkshopFinal1.pdf More Documents & Publications Agenda 2015 DOE Acquisition and Project Management...

  13. Microsoft Word - Fact Sheet Energy Speech 082508 FINAL.doc |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Speech 082508 FINAL.doc Microsoft Word - Fact Sheet Energy Speech 082508 FINAL.doc More Documents & Publications Microsoft Word - Press Release RECOMP 2-8-08 REV FINAL.doc ...

  14. Attachment C - Summary GHG Emissions Data FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Summary GHG Emissions Data FINAL Attachment C - Summary GHG Emissions Data FINAL Attachment C - Summary GHG Emissions Data FINAL (33.78 KB) More Documents & Publications Attachment C

  15. Attachment C Summary GHG Emissions Data FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary GHG Emissions Data FINAL Attachment C Summary GHG Emissions Data FINAL Attachment-C-Summary-GHG-Emissions-Data-FINAL.xlsx (34.24 KB) More Documents & Publications Attachment C -

  16. Property:NEPA FinalEA-EISDate | Open Energy Information

    Open Energy Info (EERE)

    FinalEA-EISDate Jump to: navigation, search Property Name NEPA FinalEA-EISDate Property Type Date This is a property of type Date. Pages using the property "NEPA FinalEA-EISDate"...

  17. PI Brief 6 15 07 final2 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PI Brief 6 15 07 final2&0; PI Brief 6 15 07 final2&0; PDF icon PI Brief 6 15 07 final2&0; More Documents & Publications POLICY FLASH 2016-04 Procurement Integrity ...

  18. Microsoft Word - ESC 10-09-08 PCDC Final Report - FINAL.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    eMeter Corporation, 2010. All rights reserved. PowerCentsDC(tm) Program Final Report September 2010 Prepared by eMeter Strategic Consulting for the Smart Meter Pilot Program, Inc. PowerCentsDC Program Final Report i September 2010 Contents Executive Summary .............................................................................................................. 1 1 Introduction

  19. (Basic radiation protection criteria). Final report

    SciTech Connect (OSTI)

    Ney, W.R.

    1982-12-03

    Progress in the following areas directly related to nuclear waste management is summarized: (1) a radiation protection system based on risk per rad of dose; (2) assessment of the accumulation and biological significance of industrial waste discharges and estimation of concentrations present in the environment; (3) assessment of exposure resulting from nuclear power; (4) internal emitter standards; (5) human radiation exposure experience; (6) the identification of national needs related to the estimation of exposure of the public from ionizing radiation; and (7) acceptable risk for management of radioactive waste. (ACR)

  20. Risk Analysis Virtual ENvironment

    Energy Science and Technology Software Center (OSTI)

    2014-02-10

    RAVEN has 3 major functionalities: 1. Provides a Graphical User Interface for the pre- and post-processing of the RELAP-7 input and output. 2. Provides the capability to model nuclear power plants control logic for the RELAP-7 code and dynamic control of the accident scenario evolution. This capability is based on a software structure that realizes a direct connection between the RELAP-7 solver engine (MOOSE) and a python environment where the variables describing the plant statusmore » are accessible in a scripting environment. RAVEN support the generation of the probabilistic scenario control by supplying a wide range of probability and cumulative distribution functions and their inverse functions. 3. Provides a general environment to perform probability risk analysis for RELAP-7, RELAP-5 and any generic MOOSE based applications. The probabilistic analysis is performed by sampling the input space of the coupled code parameters and it is enhanced by using modern artificial intelligence algorithms that accelerate the identification of the areas of major risk (in the input parameter space). This environment also provides a graphical visualization capability to analyze the outcomes. Among other approaches, the classical Monte Carlo and Latin Hypercube sampling algorithms are available. For the acceleration of the convergence of the sampling methodologies, Support Vector Machines, Bayesian regression, and collocation stochastic polynomials chaos are implemented. The same methodologies here described could be used to solve optimization and uncertainties propagation problems using the RAVEN framework.« less

  1. Risk Analysis Virtual ENvironment

    SciTech Connect (OSTI)

    2014-02-10

    RAVEN has 3 major functionalities: 1. Provides a Graphical User Interface for the pre- and post-processing of the RELAP-7 input and output. 2. Provides the capability to model nuclear power plants control logic for the RELAP-7 code and dynamic control of the accident scenario evolution. This capability is based on a software structure that realizes a direct connection between the RELAP-7 solver engine (MOOSE) and a python environment where the variables describing the plant status are accessible in a scripting environment. RAVEN support the generation of the probabilistic scenario control by supplying a wide range of probability and cumulative distribution functions and their inverse functions. 3. Provides a general environment to perform probability risk analysis for RELAP-7, RELAP-5 and any generic MOOSE based applications. The probabilistic analysis is performed by sampling the input space of the coupled code parameters and it is enhanced by using modern artificial intelligence algorithms that accelerate the identification of the areas of major risk (in the input parameter space). This environment also provides a graphical visualization capability to analyze the outcomes. Among other approaches, the classical Monte Carlo and Latin Hypercube sampling algorithms are available. For the acceleration of the convergence of the sampling methodologies, Support Vector Machines, Bayesian regression, and collocation stochastic polynomials chaos are implemented. The same methodologies here described could be used to solve optimization and uncertainties propagation problems using the RAVEN framework.

  2. Final Report Computational Analysis of Dynamical Systems

    SciTech Connect (OSTI)

    Guckenheimer, John

    2012-05-08

    This is the final report for DOE Grant DE-FG02-93ER25164, initiated in 1993. This grant supported research of John Guckenheimer on computational analysis of dynamical systems. During that period, seventeen individuals received PhD degrees under the supervision of Guckenheimer and over fifty publications related to the grant were produced. This document contains copies of these publications.

  3. FinalReport-3-13

    Office of Scientific and Technical Information (OSTI)

    Final R eport f or E nhancing t he M PI P rogramming M odel f or PetaScale S ystems PI: W ... i nspired several papers a t E uroMPI'11. W e b elieve t hat o ur algorithm a nd w ork r ...

  4. Modeling of GE Appliances: Final Presentation

    SciTech Connect (OSTI)

    Fuller, Jason C.; Vyakaranam, Bharat; Leistritz, Sean M.; Parker, Graham B.

    2013-01-31

    This report is the final in a series of three reports funded by U.S. Department of Energy Office of Electricity Delivery and Energy Reliability (DOE-OE) in collaboration with GE Appliances’ through a Cooperative Research and Development Agreement (CRADA) to describe the potential of GE Appliances’ DR-enabled appliances to provide benefits to the utility grid.

  5. Final Vitrification Melter And Vessels Evaluation Documentation

    Broader source: Energy.gov [DOE]

    DOE has prepared final evaluations and made waste incidental to reprocessing determinations for the vitrification melter and feed vessels (the concentrator feed makeup tank and the melter feed hold tank), used by DOE’s West Valley Demonstration Project as part of the process to vitrify waste from prior commercial reprocessing of spent nuclear fuel.

  6. EIS-0414: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0414: EPA Notice of Availability of a Final Environmental Impact Statement Energia Sierra Juarez Transmission Project EPA announces the availability of the Final...

  7. EIS-0427: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of a Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona EPA announces the availability of the Final...

  8. EIS-0317-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Impact Statement EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  9. Department of Energy Acquisition Regulation (DEAR) Final Rule...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, and C ... Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, ...

  10. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0468: Final Environmental Impact Statement EA-1607: Final Environmental Assessment Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium...

  11. Roadmap Finalized for Low-Temperature, Coproduced, and Geopressured...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roadmap Finalized for Low-Temperature, Coproduced, and Geopressured Technologies Roadmap Finalized for Low-Temperature, Coproduced, and Geopressured Technologies March 23, 2011 -...

  12. 2011 Final Report - Nano-Oxide Photocatalysis for Solar Energy...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: 2011 Final Report - Nano-Oxide Photocatalysis for Solar Energy Conversion Citation Details In-Document Search Title: 2011 Final Report - Nano-Oxide Photocatalysis ...

  13. EIS-0072: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0072: Final Environmental Impact Statement Great Plains Gasification Project, Mercer County, North Dakota PDF icon EIS-0072: Final Environmental Impact Statement, Volume 1 PDF ...

  14. EA-1775: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1775: Final Environmental Assessment Texas A&M University Combined Heat and Power Project, College Station, Texas DOE prepared this Environmental ...

  15. EA-1506: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    06: Final Environmental Assessment EA-1506: Final Environmental Assessment Changing World Technologies' Thermal Conversion Process Commercial Demonstration Plant The purpose of the ...

  16. EIS-0468: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Final Environmental Impact Statement EIS-0468: EPA Notice of Availability of the Final Environmental Impact Statement American Centrifuge Plant, ...

  17. EIS-0139: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    139: Final Environmental Impact Statement EIS-0139: Final Environmental Impact Statement Trans-Alaska Gas System EIS-0139-FEIS-1988.pdf (37.74 MB) More Documents & Publications ...

  18. EA-1789: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1789: Final Environmental Assessment Construction and Operation of a Proposed ... (API) to support the final design, construction, and start-up of a cellulose to ...

  19. EIS-0171: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    71: Final Environmental Impact Statement EIS-0171: Final Environmental Impact Statement Bonneville Power Administration, PacifiCorp Capacity Power Sale Contract The Bonneville ...

  20. EIS-0116: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project PDF icon ...

  1. EIS-0073: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0073: Final Environmental Impact Statement Solvent Refined Coal-I Demonstration Project, Daviess County, Kentucky PDF icon ...

  2. EIS-0145: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Impact Statement EIS-0145: Final Environmental Impact Statement Non-Federal Participation in Alternating Current Intertie PDF icon DOEEIS-0145, Bonneville ...

  3. EIS-0455: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0455: Final Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA The BLM's purpose and need for the GSEP is to...

  4. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho The U.S. Department of Energy...

  5. EIS-0454: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project PDF icon EIS-0454-FEIS-2011.pdf More...

  6. EIS-0343: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0343: Final Environmental Impact Statement COB Energy Facility COB Energy Facility, LLC, a subsidiary of Peoples Energy Resources Company...

  7. EIS-0359: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0359: Final Environmental Impact Statement ... This site-specific EIS considers the construction, operation, maintenance, and ...

  8. EIS-0391: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0391: Final Environmental Impact Statement Hanford Tank Closure and Waste Management, Hanford Site, Richland, WA This EIS evaluates the ...

  9. EIS-0064: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0064: Final Environmental Impact Statement Rocky Flats Plant Site, Jefferson County, Golden, Colorado (see also ERDA-1545-D) EIS-0064: Final Environmental Impact Statement, ...

  10. EIS-0414: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0414: Final Environmental Impact Statement Energia Sierra Juarez Transmission Project This EIS evaluates the potential environmental ...

  11. EIS-0354: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Final Environmental Impact Statement EIS-0354: Final Environmental Impact Statement ... near-term and future power needs.The Draft EIS (published in November 2002) evaluated ...

  12. EIS-0333: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm This Draft Environmental Impact Statement...

  13. Final Report Implementing Office of Management and Budget Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Report Implementing Office of Management and Budget Information Dissemination Quality Guidelines (DOE, 2002) Final Report Implementing Office of Management and Budget ...

  14. EIS-0243: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    3: Final Environmental Impact Statement EIS-0243: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  15. EIS-0228: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    8: Final Environmental Impact Statement EIS-0228: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  16. EA-1955: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1955: Final Environmental Assessment Campbell County Wind Farm; Campbell County, South Dakota Western Area Power Administration (Western) issued a ...

  17. EIS-0377: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project A systems study was carried out to identify...

  18. EIS-0421: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0421: Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA PDF icon...

  19. Final Report on Experimental and Numerical Modeling Activities...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Final Report on Experimental and Numerical Modeling Activities for the Newark Basin Citation Details In-Document Search Title: Final Report on Experimental and ...

  20. Process Equipment Cost Estimation, Final Report (Technical Report...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process Equipment Cost Estimation, Final Report Citation Details In-Document Search Title: Process Equipment Cost Estimation, Final Report You are accessing a document from the ...

  1. Microsoft Word - Final Sample Participant Profile November 2008...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Sample Participant Profile November 2008.doc Microsoft Word - Final Sample Participant Profile November 2008.doc More Documents & Publications Microsoft Word - ...

  2. EA-1938: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1938: Final Environmental Assessment Grieve Unit CO2 Enhanced Recovery Project, Natrona County, WY The Bureau of Land Management prepared, with...

  3. Final Report for the DOE Chemical Hydrogen Storage Center of...

    Office of Environmental Management (EM)

    Final Report for the DOE Chemical Hydrogen Storage Center of Excellence Final Report for the DOE Chemical Hydrogen Storage Center of Excellence This technical report describes the ...

  4. Barrow Black Carbon Source and Impact Study Final Campaign Report...

    Office of Scientific and Technical Information (OSTI)

    Barrow Black Carbon Source and Impact Study Final Campaign Report Citation Details In-Document Search Title: Barrow Black Carbon Source and Impact Study Final Campaign Report The ...

  5. EA-1995: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Assessment EA-1995: Final Environmental Assessment Trestle Bay Ecosystem Restoration Project, Clatsop County, Oregon The U.S. Army Corps of Engineers issued a ...

  6. Notice of Final Determination, Federal Register, 71 FR 47791...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Determination, Federal Register, 71 FR 47791, August 18, 2006 Notice of Final Determination, Federal Register, 71 FR 47791, August 18, 2006 Document displays the notice of ...

  7. Final Report: Ionization chemistry of high temperature molecular...

    Office of Scientific and Technical Information (OSTI)

    Final Report: Ionization chemistry of high temperature molecular fluids Citation Details In-Document Search Title: Final Report: Ionization chemistry of high temperature molecular ...

  8. EA-1923: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Assessment EA-1923: Final Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This EA ...

  9. Lidar Inter-Comparison Exercise Final Campaign Report (Program...

    Office of Scientific and Technical Information (OSTI)

    Program Document: Lidar Inter-Comparison Exercise Final Campaign Report Citation Details In-Document Search Title: Lidar Inter-Comparison Exercise Final Campaign Report The ...

  10. Final Technical Report: Discovering the Nature of Dark Energy...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Final Technical Report: Discovering the Nature of Dark Energy: Towards Better Distances from Type Ia Supernovae Citation Details In-Document Search Title: Final...

  11. Transmittal Letter for Final Federal Renewable Energy Guidance...

    Office of Environmental Management (EM)

    Transmittal Letter for Final Federal Renewable Energy Guidance Transmittal Letter for Final Federal Renewable Energy Guidance Letter to federal energy officials summarizing the new ...

  12. EIS-0423: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : EPA Notice of Availability of the Final Environmental Impact Statement EIS-0423: EPA Notice of Availability of the Final Environmental Impact Statement Long -Term Management and ...

  13. EIS-0386: EPA Notice of Availability of the Programmatic Final...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Programmatic Final Environmental Impact Statement EIS-0386: EPA Notice of Availability of the Programmatic Final Environmental Impact Statement ...

  14. EIS-0387: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0387: EPA Notice of Availability of the Final ... More Documents & Publications EIS-0445: EPA Notice of Availability of the Draft ...

  15. EIS-0409: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Final Environmental Impact Statement EIS-0409: EPA Notice of Availability of the Final Environmental Impact Statement Kemper County Integrated ...

  16. EIS-0450: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of a Final Environmental Impact Statement EIS-0450: EPA Notice of Availability of a Final Environmental Impact Statement TransWest Express Transmission ...

  17. EIS-0435: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0435: EPA Notice of Availability of the Final Environmental Impact Statement Groton Generation Station ...

  18. EIS-0336: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Final Environmental Impact Statement EIS-0336: EPA Notice of Availability of the Final Environmental Impact Statement Tucson Electric Power ...

  19. EA-1772: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1772: Final Environmental Assessment Multipurpose Haul ... The U.S. Department of Energy (DOE) proposes to provide an alternative route, other than ...

  20. EIS-0060: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0060: Final Environmental Impact Statement Bonneville Power Administration Proposed FY 1981 Program PDF icon EIS-0060: Final Environmental Impact Statement More Documents & ...

  1. Final Report, Volume 1, Metallurgical Evaluation of Cast Duplex...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Final Report, Volume 1, Metallurgical Evaluation of Cast Duplex Stainless Steels and their Weldments Citation Details In-Document Search Title: Final Report, ...

  2. Final Report: Stability and Novel Properties of Magnetic Materials...

    Office of Scientific and Technical Information (OSTI)

    Final Report: Stability and Novel Properties of Magnetic Materials and Ferromagnet Insulator Interfaces Citation Details In-Document Search Title: Final Report: Stability and ...

  3. Atmospheric Line of Site Experiment (ALOSE) Final Campaign Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (ALOSE) Final Campaign Summary W Smith S Green M Howard M Yesalusky N Modlin ... (ALOSE) Final Campaign Summary W Smith, Sr., Hampton UniversityUniversity of ...

  4. EIS-0350-SA-02: Final Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    350-SA-02: Final Supplement Analysis EIS-0350-SA-02: Final Supplement Analysis Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los...

  5. EA-1819: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment EA-1819: Final Environmental Assessment Kilowatts for Kenston Wind Energy Project, Chagrin Falls, Geauga County The Department of Energy has ...

  6. EA-1975: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1975: Final Environmental Assessment Linac Coherent Light Source-IL, SLAC National Accelerator Laboratory, Menlo Park, California DOE issued a ...

  7. EA-1820: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    20: Final Environmental Assessment EA-1820: Final Environmental Assessment Archbold Area Local School Wind Project Archbold, Fulton County, Ohio The U.S. Department of Energy (DOE) ...

  8. EA-1839: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    39: Final Environmental Assessment and Finding of No Significant Impact EA-1839: Final Environmental Assessment and Finding of No Significant Impact Department of Energy Loan ...

  9. EA-1972: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1972: Final Environmental Assessment Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona Western Area Power ...

  10. EA-1262: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    62: Final Environmental Assessment EA-1262: Final Environmental Assessment McKay Bypass Canal Extension This EA evaluates the environmental impacts for the proposal to extend the ...

  11. EA-1891: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1891: Final Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration prepared an EA to ...

  12. EA-1807: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Assessment EA-1807: Final Environmental Assessment Heartland Community College Wind Energy Project, Normal, McLean County, Illinois DOE has provided a State ...

  13. EA-1934: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1934: Final Environmental Assessment Expansion of Active Borrow Areas, Hanford Site, Richland, Washington This EA evaluates the potential ...

  14. ATVM Interim Final Rule Correction | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    A few corrections to the final rule regarding fuel economy numbers. ATVM Interim Final Rule Correction More Documents & Publications Updated Guidance For Applicants To Advanced...

  15. EA-1800: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1800: Final Environmental Assessment Monarch Warren County Wind Turbine Project The U.S. Department of Energy (DOE) has provided Federal funding...

  16. EA-1906: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1906: Final Environmental Assessment Operations, Upgrades, and Consolidation at the Western Command Site, NM This NNSA EA evaluates the potential...

  17. EA-1829: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1829: Final Environmental Assessment and Finding of No Significant Impact Phycal Algae Pilot Project, Wahiawa...

  18. EA-1593: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Assessment EA-1593: Final Environmental Assessment Y-12 Steam Plant Life Extenstion Project - Steam Plant Replacement Subproject The National Nuclear...

  19. EA-1960: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western...

  20. EA-1541: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    41: Final Environmental Assessment EA-1541: Final Environmental Assessment Demolition of Building 51 and the Bevatron at Lawrence Berkeley National Laboratory This Environmental...

  1. EA-1826: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1826: Final Environmental Assessment AV Solar Ranch One Project, Los Angeles and Kern Counties, California The U.S. Department of Energy (DOE) is...

  2. EA-1866: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Assessment and Finding of No Significant Impact EA-1866: Final Environmental Assessment and Finding of No Significant Impact Argonne National Laboratory...

  3. EA-1889: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment and Finding of No Significant Impact EA-1889: Final Environmental Assessment and Finding of No Significant Impact Disposal of Decommissioned,...

  4. EA-1869: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    69: Final Environmental Assessment and Finding of No Significant Impact EA-1869: Final Environmental Assessment and Finding of No Significant Impact General Motors LLC, Electric...

  5. EA-1510: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Assessment EA-1510: Final Environmental Assessment Alternate Financed Facility Modernization The purpose of the Proposed Action is to transfer two parcels of...

  6. EA-1905: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Assessment EA-1905: Final Environmental Assessment Department of Energy Funding For Double Eagle Water System, Carlsbad, New Mexico (November 2011) For more...

  7. EA-1769: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment and Finding of No Significant Impact EA-1769: Final Environmental Assessment and Finding of No Significant Impact Houston Advanced Research...

  8. EA-1602: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Final Environmental Assessment EA-1602: Final Environmental Assessment Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water...

  9. EA-1884: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1884: Final Environmental Assessment Invenergy Interconnection for the Wray Wind Energy Project, Town of Wray, Yuma County, CO DOE's Western Area...

  10. EA-1870: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1870: Final Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant, Kanab, UT The U.S. Department of Energy (DOE) prepared this...

  11. Final Environmental Impact Statement Brings DOE Closer to Disposing...

    Office of Environmental Management (EM)

    Final Environmental Impact Statement Brings DOE Closer to Disposing Unique Waste Final Environmental Impact Statement Brings DOE Closer to Disposing Unique Waste March 16, 2016 - ...

  12. Energy Department Finalizes $337 Million Loan Guarantee to Mesquite...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Finalizes 337 Million Loan Guarantee to Mesquite Solar 1 for Innovative Solar Power Plant Energy Department Finalizes 337 Million Loan Guarantee to Mesquite Solar 1 for...

  13. EIS-0450: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Impact Statement EIS-0450: Final Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada Download Document ...

  14. EIS-0309: Final Site-Wide Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Site-Wide Environmental Impact Statement EIS-0309: Final Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA ...

  15. EIS-0219: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Impact Statement EIS-0219: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  16. EIS-0270: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Impact Statement EIS-0270: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  17. EIS-0376: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0376: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  18. EIS-0375: DOE Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: DOE Notice of Availability of Final Environmental Impact Statement EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement Disposal of Greater-than-Class-C ...

  19. EIS-0486: DOE Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Availability of Final Environmental Impact Statement EIS-0486: DOE Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project ...

  20. EIS-0217: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Final Environmental Impact Statement EIS-0217: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  1. EIS-0499: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Final Environmental Impact Statement EIS-0499: EPA Notice of Availability of Final Environmental Impact Statement Great Northern Transmission Line ...

  2. EIS-0068: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Final Environmental Impact Statement EIS-0068: Final Environmental Impact Statement Development Policy Options for the Naval Oil Shale Reserves in Colorado PDF icon EIS-0068: ...

  3. EIS-0249: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    49: Final Environmental Impact Statement EIS-0249: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  4. EIS-0297: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    297: Final Environmental Impact Statement EIS-0297: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  5. National Fuel Cell Electric Vehicle Learning Demonstration Final...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electric Vehicle Learning Demonstration Final Report National Fuel Cell Electric Vehicle Learning Demonstration Final Report This report discusses key analysis results based on ...

  6. EIS-0085-S: Final Environmental Impact Statement | Department...

    Energy Savers [EERE]

    EIS-0085-S: Final Environmental Impact Statement Liquid-Metal Fast Breeder Reactor Program, Supplemental PDF icon EIS-0085-FSEIS.pdf More Documents & Publications EIS-0018: Final ...

  7. Microsoft Word - 564M_Biomass_Project Descriptions FINAL 120409...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Microsoft Word - 564MBiomassProject Descriptions FINAL 120409 Microsoft Word - 564MBiomassProject Descriptions FINAL 120409 (100.66 KB) More Documents & Publications ...

  8. Wind Forecast Improvement Project Southern Study Area Final Report...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Wind Forecast Improvement Project Southern Study Area Final Report Wind Forecast Improvement Project Southern Study Area Final Report Wind Forecast Improvement Project Southern ...

  9. EA-1959: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Assessment EA-1959: Final Environmental Assessment Eightmile Ranch ... EA-1959: Draft Environmental Assessment EIS-0425: Draft Environmental Impact Statement ...

  10. EA-1952: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1952: Final Environmental Assessment Lane-Wendson No. 1 ... More Documents & Publications EA-1952: Finding of No Significant Impact EA-1952: Draft

  11. EA-1855: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1855: Final Environmental Assessment Creston-Bell Rebuild Project, Lincoln and Spokane Counties, Washington (aka DOEEA-4406) This EA evaluates...

  12. Ion Deflection for Final Optics In Laser Inertial Fusion Power...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Ion Deflection for Final Optics In Laser Inertial Fusion Power Plants Citation Details In-Document Search Title: Ion Deflection for Final Optics In Laser Inertial ...

  13. EIS-0485: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0485: Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power ...

  14. Research in theoretical nuclear and neutrino physics. Final report...

    Office of Scientific and Technical Information (OSTI)

    Research in theoretical nuclear and neutrino physics. Final report Citation Details In-Document Search Title: Research in theoretical nuclear and neutrino physics. Final report The ...

  15. Geothermal Exploration Techniques a Case Study. Final Report...

    Open Energy Info (EERE)

    Techniques a Case Study. Final Report Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Geothermal Exploration Techniques a Case Study. Final Report...

  16. EIS-0108: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    08: Final Environmental Impact Statement EIS-0108: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  17. Final Scientific/Technical Report for Project entitled "Mechanism...

    Office of Scientific and Technical Information (OSTI)

    Final ScientificTechnical Report for Project entitled "Mechanism of Uranium Reduction by Shewanella oneidensis" Citation Details In-Document Search Title: Final Scientific...

  18. EIS-0332: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project This document is the final Environmental Impact Statement...

  19. Biomass Burning Observation Project (BBOP) Final Campaign Report...

    Office of Scientific and Technical Information (OSTI)

    Biomass Burning Observation Project (BBOP) Final Campaign Report Citation Details In-Document Search Title: Biomass Burning Observation Project (BBOP) Final Campaign Report The Biomass ...

  20. LM Issues Final Programmatic Environmental Impact Statement on...

    Energy Savers [EERE]

    Issues Final Programmatic Environmental Impact Statement on the Uranium Leasing Program LM Issues Final Programmatic Environmental Impact Statement on the Uranium Leasing Program ...

  1. Searches for new physics in photon final states (Conference)...

    Office of Scientific and Technical Information (OSTI)

    Conference: Searches for new physics in photon final states Citation Details In-Document Search Title: Searches for new physics in photon final states Authors: Loginov, Andrey ; ...

  2. EA-1917: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Assessment EA-1917: Final Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates the potential environmental impacts of a ...

  3. EIS-0082-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    S1: Final Supplemental Environmental Impact Statement EIS-0082-S1: Final Supplemental Environmental Impact Statement The Department of Energy (DOE) limits electronic access to ...

  4. Direct_Final_Rule_Bill.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications DOE Retrospective Review Plan Report May 2012 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: FINAL RULE EA-1774-S1: Final Environmental Assessment and ...

  5. EIS-0095: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0095: Final Environmental Impact Statement Bonneville Power Administration's Expanded Residential Weatherization Program The U.S....

  6. Towards secure virtual directories : a risk analysis framework.

    SciTech Connect (OSTI)

    Claycomb, William R.

    2010-07-01

    Directory services are used by almost every enterprise computing environment to provide data concerning users, computers, contacts, and other objects. Virtual directories are components that provide directory services in a highly customized manner. Unfortunately, though the use of virtual directory services are widespread, an analysis of risks posed by their unique position and architecture has not been completed. We present a detailed analysis of six attacks to virtual directory services, including steps for detection and prevention. We also describe various categories of attack risks, and discuss what is necessary to launch an attack on virtual directories. Finally, we present a framework to use in analyzing risks to individual enterprise computing virtual directory instances. We show how to apply this framework to an example implementation, and discuss the benefits of doing so.

  7. IEA-Risk Quantification and Risk Management in Renewable Energy...

    Open Energy Info (EERE)

    Energy Topics: Finance, Implementation, Market analysis Resource Type: Presentation, Lessons learnedbest practices Website: www.iea-retd.orgfilesRISK%20IEA-RETD%20(2011-6)....

  8. Risk Management RM | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Risk Management RM Risk Management RM This tool is the process of continuous and iterative identification and control of project risks and opportunities. Risks can be technical, financial, or programmatic. The goal for the risk management system is to either avoid the risk's threat by taking preemptive action or to minimize the risks negative impacts on project performance. Project opportunities identified through the project risk management process can be handled in a similar manner with the

  9. DOE Releases Electricity Subsector Cybersecurity Risk Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Releases Electricity Subsector Cybersecurity Risk Management Process (RMP) Guideline DOE Releases Electricity Subsector Cybersecurity Risk Management Process (RMP) Guideline May ...

  10. AMERIND Risk Annual Conference and Trade Fair

    Broader source: Energy.gov [DOE]

    Hosted by the AMERIND Risk, this three-day conference includes risk management training, workers' safety, human resources, and more.

  11. Estimated human health risks of disposing of nonhazardous oil field waste in salt caverns

    SciTech Connect (OSTI)

    Tomasko, D.; Elcock, D.; Veil, J.

    1997-09-01

    Argonne National Laboratory (ANL) has completed an evaluation of the possibility that adverse human health effects (carcinogenic and noncarcinogenic) could result from exposure to contaminants released from nonhazardous oil field wastes (NOW) disposed in domal salt caverns. In this assessment, several steps were used to evaluate potential human health risks: identifying potential contaminants of concern, determining how humans could be exposed to these contaminants, assessing the contaminants` toxicities, estimating contaminant intakes, and, finally, calculating human cancer and noncancer risks.

  12. Information needs for risk assessment

    SciTech Connect (OSTI)

    DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

    1990-12-31

    Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

  13. Managing risk in software systems

    SciTech Connect (OSTI)

    Fletcher, S.K.; Jansma, R.M.; Murphy, M.D.

    1995-07-01

    A methodology for risk management in the design of software systems is presented. It spans security, safety, and correct operation of software within the context of its environment, and produces a risk analysis and documented risk management strategy. It is designed to be iteratively applied, to attain appropriate levels of detail throughout the analysis. The methodology and supporting tools are discussed. The methodology is critiqued relative to other research in the field. Some sample applications of the methodology are presented.

  14. DCE Bio Detection System Final Report

    SciTech Connect (OSTI)

    Lind, Michael A.; Batishko, Charles R.; Morgen, Gerald P.; Owsley, Stanley L.; Dunham, Glen C.; Warner, Marvin G.; Willett, Jesse A.

    2007-12-01

    The DCE (DNA Capture Element) Bio-Detection System (Biohound) was conceived, designed, built and tested by PNNL under a MIPR for the US Air Force under the technical direction of Dr. Johnathan Kiel and his team at Brooks City Base in San Antonio Texas. The project was directed toward building a measurement device to take advantage of a unique aptamer based assay developed by the Air Force for detecting biological agents. The assay uses narrow band quantum dots fluorophores, high efficiency fluorescence quenchers, magnetic micro-beads beads and selected aptamers to perform high specificity, high sensitivity detection of targeted biological materials in minutes. This final report summarizes and documents the final configuration of the system delivered to the Air Force in December 2008

  15. EMAB Risk Subcommittee Interim Report

    Office of Environmental Management (EM)

    ADVISORY BOARD Incorporating Risk and Sustainability into Decision Making Submitted by the ... Secondly, the Subcommittee is tasked with reviewing"incorporating sustainability into the ...

  16. Budget Risk & Prioritization Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    BRPAtool performs the following: •Assists managers in making solid decisions on what scope/activities to reduce and/or eliminate, to meet constrained budgets, based on multiple risk factors •Enables analysis of different budget scenarios •Can analyze risks and cost for each activity based on technical, quantifiable risk criteria and management-determined risks •Real-time analysis •Enables managers to determine the multipliers and where funding is best applied •Promotes solid budget defense

  17. ORISE: Crisis and Risk Communication

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    U.S. Department of Energy (DOE) Oak Ridge Office (ORO), ORISE provides crisis and risk communication support through the management of its Joint Information Center (JIC)...

  18. R00475--FM Risk Mgmt

    Energy Savers [EERE]

    to project success. The risk identification process on a project is typically one of brain- storming, and the usual rules of brainstorming apply: * The full project team should...

  19. FY 2014 Excess Elimination Report FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Excess Elimination Report FINAL FY 2014 Excess Elimination Report FINAL FY 2014 Excess Elimination Report FINAL.PDF (935.35 KB) More Documents & Publications FY 2013 Excess Elimination Report UCOR Contract & Fee Determination EA-1451: Final Environmental Assessment

  20. Final Report Appendices: Preliminary Process and Market Evaluation: Better

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings Neighborhood Program | Department of Energy Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program Final Report Appendices: Preliminary Process and Market Evaluation: Better Buildings Neighborhood Program, December 2012. Final Report Appendices (2.29 MB) More Documents & Publications Preliminary Process and Market

  1. EIS-0050-S: Final Supplemental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    50-S: Final Supplemental Impact Statement EIS-0050-S: Final Supplemental Impact Statement Commercial and Apartment Conservation Service Program, Supplemental EIS-0050_SEIS.pdf (2.92 MB) More Documents & Publications EIS-0095: Final Environmental Impact Statement EIS-0102: Final Environmental Impact Statement EIS-0127

  2. 30 Day Federal Register Notice Extension - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension - FINAL 30 Day Federal Register Notice Extension - FINAL 30DAY Federal Register Notice Extension-Final.pdf (14.21 KB) More Documents & Publications 60 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Proposed

  3. 30 Day Federal Register Notice Proposed - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed - FINAL 30 Day Federal Register Notice Proposed - FINAL 30DAY Federal Resigter Notice Proposed-Final.pdf (13.65 KB) More Documents & Publications 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Extension - FINAL 60 Day Federal Register Notice Extension

  4. EIS-0026-S: Final Supplemental Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Final Supplemental Environmental Impact Statement, Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

  5. FTA- SunLine Transit Agency- Final Report

    Broader source: Energy.gov [DOE]

    Final Report on the Federal Transit Administration, SunLine Transit Agency Cooperative Agreement (Part One)

  6. Microsoft Word - Clemson DTTF FINAL_EA

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ENVIRONMENTAL ASSESSMENT for the CLEMSON UNIVERSITY WIND TURBINE DRIVETRAIN TEST FACILITY NORTH CHARLESTON, SOUTH CAROLINA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2010 DOE/EA-1761 FINAL ENVIRONMENTAL ASSESSMENT for the CLEMSON UNIVERSITY WIND TURBINE DRIVETRAIN TEST FACILITY NORTH CHARLESTON, SOUTH CAROLINA U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2010 DOE/EA-1761

  7. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    2 Appliances in U.S. Homes, by Owner/Renter Status, 2009" " Million Housing Units, Final" ,,,,"Housing Unit Type" ,,,,"Single-Family Units",,,,"Apartments in Buildings With" ,"Total U.S.1 (millions)",,,"Detached",,"Attached",,"2 to 4 Units",,"5 or More Units",,"Mobile Homes"

  8. Microsoft Word - Final EA- ADM.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    28 Final Environmental Assessment Industrial Carbon Capture and Sequestration (ICCS) Area 1 Project "CO 2 Capture from Biofuels Production and Sequestration into the Mt. Simon Sandstone" Archer Daniels Midland Company Decatur, Illinois For U.S. Department of Energy National Energy Technology Laboratory DE-FE0001547 April 2011 ACKNOWLEDGEMENT This report was prepared with the support of the U.S. Department of Energy (DOE) under Award No. DE-FE0001547 (Recovery Act - Industrial Carbon

  9. Laboratory awards final Recovery Act demolition contracts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Recovery Act demolition contracts Laboratory awards final Recovery Act demolition contracts The two winning bidders will each demolish a portion of the remaining unused buildings at the Lab's historic Technical Area 21. April 20, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

  10. Final Technical report-4-30-13

    Office of Scientific and Technical Information (OSTI)

    FINAL TECHNICAL REPORT DE-FG02-05ER64124 Microbial Tc(VII) reduction is an attractive alternative strategy for bioremediation of technetium-contaminated subsurface environments. Traditional ex situ remediation processes (e.g., adsorption or ion exchange) are often limited by poor extraction efficiency, inhibition by competing ions and production of large volumes of produced waste. Microbial Tc(VII) reduction provides an attractive alternative in situ remediation strategy since the reduced

  11. Public Discourse in Energy Policy Decision-Making: Final Report

    SciTech Connect (OSTI)

    Idaho Citizen; Eileen DeShazo; John Freemuth; Tina Giannini; Troy Hall; Ann Hunter; Jeffrey C. Joe; Michael Louis; Carole Nemnich; Jennie Newman; Steven J. Piet; Stephen Sorensen; Paulina Starkey; Kendelle Vogt; Patrick Wilson

    2010-08-01

    The ground is littered with projects that failed because of strong public opposition, including natural gas and coal power plants proposed in Idaho over the past several years. This joint project , of the Idaho National Laboratory, Boise State University, Idaho State University and University of Idaho has aimed to add to the tool box to reduce project risk through encouraging the public to engage in more critical thought and be more actively involved in public or social issues. Early in a project, project managers and decision-makers can talk with no one, pro and con stakeholder groups, or members of the public. Experience has shown that talking with no one outside of the project incurs high risk because opposition stakeholders have many means to stop most (if not all) energy projects. Talking with organized stakeholder groups provides some risk reduction from mutual learning, but organized groups tend not to change positions except under conditions of a negotiated settlement. Achieving a negotiated settlement may be impossible. Furthermore, opposition often arises outside pre-existing groups. Standard public polling provides some information but does not reveal underlying motivations, intensity of attitudes, etc. Improved methods are needed that probe deeper into stakeholder (organized groups and members of the public) values and beliefs/heuristics to increase the potential for change of opinions and/or out-of-box solutions. The term “heuristics” refers to the mental short-cuts, underlying beliefs, and paradigms that everyone uses to filter and interpret information, to interpret what is around us, and to guide our actions and decisions. This document is the final report of a 3-year effort to test different public discourse methods in the subject area of energy policy decision-making. We analyzed 504 mail-in surveys and 80 participants in groups on the Boise State University campus for their preference, financial support, and evaluations of eight attributes

  12. 2007 Wholesale Power Rate Case Initial Proposal : Risk Analysis Study.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2005-11-01

    The Federal Columbia River Power System (FCRPS), operated on behalf of the ratepayers of the PNW by BPA and other Federal agencies, faces many uncertainties during the FY 2007-2009 rate period. Among these uncertainties, the largest revolve around hydro conditions, market prices and river operations for fish recovery. In order to provide a high probability of making its U.S. Treasury payments, BPA performs a Risk Analysis as part of its rate-making process. In this Risk Analysis, BPA identifies key risks, models their relationships, and then analyzes their impacts on net revenues (total revenues less expenses). BPA subsequently evaluates in the ToolKit Model the Treasury Payment Probability (TPP) resulting from the rates, risks, and risk mitigation measures described here and in the Wholesale Power Rate Development Study (WPRDS). If the TPP falls short of BPA's standard, additional risk mitigation revenues, such as PNRR and CRAC revenues are incorporated in the modeling in ToolKit until the TPP standard is met. Increased wholesale market price volatility and six years of drought have significantly changed the profile of risk and uncertainty facing BPA and its stakeholders. These present new challenges for BPA in its effort to keep its power rates as low as possible while fully meeting its obligations to the U.S. Treasury. As a result, the risk BPA faces in not receiving the level of secondary revenues that have been credited to power rates before receiving those funds is greater. In addition to market price volatility, BPA also faces uncertainty around the financial impacts of operations for fish programs in FY 2006 and in the FY 2007-2009 rate period. A new Biological Opinion or possible court-ordered change to river operations in FY 2006 through FY 2009 may reduce BPA's net revenues included Initial Proposal. Finally, the FY 2007-2009 risk analysis includes new operational risks as well as a more comprehensive analysis of non-operating risks. Both the operational

  13. Microsoft Word - Highlights final.doc

    Gasoline and Diesel Fuel Update (EIA)

    6 1 March 2006 Short-Term Energy Outlook March 7, 2006 Release Overview Continued steady world oil demand growth, combined with only modest increases in world spare oil production capacity, and the continuing risks of geopolitical instability, are expected to keep crude oil prices high through 2006. The price of West Texas Intermediate (WTI) crude oil is projected to average $64 per barrel in 2006 and $61 in 2007 (Figure 1. West Texas Intermediate Crude Oil Price). While the average retail price

  14. Evaluation of the Better Buildings Neighborhood Program, Final Synthesis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report, Volume 1 | Department of Energy Better Buildings Neighborhood Program, Final Synthesis Report, Volume 1 Evaluation of the Better Buildings Neighborhood Program, Final Synthesis Report, Volume 1 Final Report: Evaluation of the Better Buildings Neighborhood Program, Final Synthesis Report, Volume 1, American Recovery and Reinvestment Act of 2009, June 2015. Prepared for U.S. Department of Energy Office of Energy Efficiency and Renewable Energy. Evaluation of BBNP, Final Synthesis

  15. Interim Final Rule and Proposed Rule | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interim Final Rule and Proposed Rule Interim Final Rule and Proposed Rule Extracted Pages from the Interim Final Rule and Proposed Rule, September 19, 2008 Interim Final Rule and Proposed Rule (111.06 KB) More Documents & Publications Comments of the Staff of the public utilities commission of the state of California on the interim final rule Comments on Notice of Proposed Rulemaking for Coordination of Federal Authorizations for Electric Transmission Facilities Changes recommended by OIRA

  16. Reaching the hip-hop generation: Final (symposium proceedings) report

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The goal of this final (closing) report is to capture the flavor of the symposium held March 1 and 2, 1993 in New York City convened by Motivational Educational Entertainment, Inc. (MEE), a black-owned communications research, consulting, and video production company based in Philadelphia, Pennsylvania. The mission of MEE is to understand, reach, and positively affect inner-city youth. Traditional communication approaches from mainstream sources to at-risk youth often don`t account for the unique way youth communicate among themselves and how they relate to the media. This understanding, however, is crucial. To understand youth communication, the people who create and send both entertaining and educational messages to urban youth must be brought into the dialogue. The meeting in New York was intended to provide an important opportunity for senders to meet and evaluate the appropriateness and effectiveness of their messages. In addition, the MEE symposium provided a forum for the continuing public debate about what needs to be done to reach today`s urban teens. Included in this document is a description of symposium goals/objectives, symposium activities, the reaction to and analysis of the symposium, recommendations for future MEE courses of action, and an appendix containing copies of press articles.

  17. Finally Underway: Implementation of the Port Hope Area Initiative - 13151

    SciTech Connect (OSTI)

    Fahey, Christine A.; Palmeter, Tim; Blanchette, Marcia

    2013-07-01

    Two distinct yet closely related waste remediation projects are finally underway in Canada under the Port Hope Area Initiative (PHAI) which aims to clean up 1.7 million cubic metres (m{sup 3}) of low-level radioactive waste (LLRW) arising from 60 years of uranium and radium operations. Under the PHAI, the Port Hope Project and the smaller Port Granby Project will result in the consolidation of the LLRW within two highly engineered, above-ground mounds, to be constructed within the municipalities of Port Hope and Clarington. These projects will fulfill the federal government commitment to the safe, long-term management of the LLRW, as set out in the legal agreement signed by the government and the host municipalities in 2001. The federal authorization to commence PHAI Remediation and Construction Phase 2 was received in late 2011 and several enabling infrastructure construction and radiological survey contracts were awarded in 2012. The contracts to remediate the waste sites and construct the new engineered mounds will be tendered in 2013. At the end of Phase 2, environmental risks will be substantially mitigated, land development restrictions lifted, and an honourable legacy left for future generations. (authors)

  18. Federal program for regulating highly hazardous materials finally takes off

    SciTech Connect (OSTI)

    Lessard, P.C. [Block Environmental Services Inc., Pleasant Hill, CA (United States)

    1996-11-01

    The Risk Management Program (RMP) rule, Section 112(r) of the Clean Air Act (CAA), was signed on May 24 and finalized on June 20. RMP is one of the most comprehensive, technically based regulatory programs for preventing, detecting and responding to accidental hazardous materials releases to have been issued in recent times. Although facilities have three years to comply, EPA estimates that the rule will affect an estimated 66,000 facilities that store highly hazardous or acutely toxic materials. The 1990 CAA Amendments are designed to prevent accidental releases of highly hazardous chemicals from stationary sources. Two significant regulatory programs that have emerged from the revised CAA are the Process Safety Management (PSM) standard and RMP. PSM is designed to protect employees and regulated by the Occupational Safety and Health Administration. RMP`s purpose is to protect the public and the environment from highly hazardous chemicals. It authorizes EPA to create a list of substances (distinct from the list generated under PSM) known to cause serious adverse effects and to implement a program for accidental chemical release prevention.

  19. Computer Security Risk Assessment

    Energy Science and Technology Software Center (OSTI)

    1992-02-11

    LAVA/CS (LAVA for Computer Security) is an application of the Los Alamos Vulnerability Assessment (LAVA) methodology specific to computer and information security. The software serves as a generic tool for identifying vulnerabilities in computer and information security safeguards systems. Although it does not perform a full risk assessment, the results from its analysis may provide valuable insights into security problems. LAVA/CS assumes that the system is exposed to both natural and environmental hazards and tomore » deliberate malevolent actions by either insiders or outsiders. The user in the process of answering the LAVA/CS questionnaire identifies missing safeguards in 34 areas ranging from password management to personnel security and internal audit practices. Specific safeguards protecting a generic set of assets (or targets) from a generic set of threats (or adversaries) are considered. There are four generic assets: the facility, the organization''s environment; the hardware, all computer-related hardware; the software, the information in machine-readable form stored both on-line or on transportable media; and the documents and displays, the information in human-readable form stored as hard-copy materials (manuals, reports, listings in full-size or microform), film, and screen displays. Two generic threats are considered: natural and environmental hazards, storms, fires, power abnormalities, water and accidental maintenance damage; and on-site human threats, both intentional and accidental acts attributable to a perpetrator on the facility''s premises.« less

  20. The risk assessment information system

    SciTech Connect (OSTI)

    Kerr, S.B.; Bonczek, R.R.; McGinn, C.W.; Land, M.L.; Bloom, L.D.; Sample, B.E.; Dolislager, F.G.

    1998-06-01

    In an effort to provide service-oriented environmental risk assessment expertise, the Department of Energy (DOE) Center for Risk Excellence (CRE) and DOE Oak Ridge Operations Office (ORO) are sponsoring Oak Ridge National Laboratory (ORNL) to develop a web-based system for disseminating risk tools and information to its users. This system, the Risk Assessment Information System (RAIS), was initially developed to support the site-specific needs of the DOE-ORO Environmental Restoration Risk Assessment Program. With support from the CRE, the system is currently being expanded to benefit all DOE risk information users and can be tailored to meet site-specific needs. Taking advantage of searchable and executable databases, menu-driven queries, and data downloads, using the latest World Wide Web technologies, the RAIS offers essential tools that are used in the risk assessment process or anywhere from project scoping to implementation. The RAIS tools can be located directly at http://risk.lsd.ornl.gov/homepage/rap{_}tool.htm or through the CRE`s homepage at http://www.doe.gov/riskcenter/home.html.

  1. Dynamical systems probabilistic risk assessment.

    SciTech Connect (OSTI)

    Denman, Matthew R.; Ames, Arlo Leroy

    2014-03-01

    Probabilistic Risk Assessment (PRA) is the primary tool used to risk-inform nuclear power regulatory and licensing activities. Risk-informed regulations are intended to reduce inherent conservatism in regulatory metrics (e.g., allowable operating conditions and technical specifications) which are built into the regulatory framework by quantifying both the total risk profile as well as the change in the risk profile caused by an event or action (e.g., in-service inspection procedures or power uprates). Dynamical Systems (DS) analysis has been used to understand unintended time-dependent feedbacks in both industrial and organizational settings. In dynamical systems analysis, feedback loops can be characterized and studied as a function of time to describe the changes to the reliability of plant Structures, Systems and Components (SSCs). While DS has been used in many subject areas, some even within the PRA community, it has not been applied toward creating long-time horizon, dynamic PRAs (with time scales ranging between days and decades depending upon the analysis). Understanding slowly developing dynamic effects, such as wear-out, on SSC reliabilities may be instrumental in ensuring a safely and reliably operating nuclear fleet. Improving the estimation of a plant's continuously changing risk profile will allow for more meaningful risk insights, greater stakeholder confidence in risk insights, and increased operational flexibility.

  2. Barwood CNG Cab Fleet Study: Final Results

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Barwood CNG Cab Fleet Study Final Results May 1999 * NREL/ TP-540-26035 Peg Whalen, Ken Kelly, and Mardi John National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute * * * * Battelle * * * * Bechtel Contract No. DE-AC36-99-GO10337 National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest

  3. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    Air Conditioning in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,," Detached"," Attached"," 2 to 4 Units","5 or More Units","Mobile Homes" "Air Conditioning" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Air Conditioning Equipment"

  4. ATAC Process Proof of Concept Final Report

    SciTech Connect (OSTI)

    Bri Rolston; Sarah Freeman

    2014-03-01

    Researchers at INL with funding from the Department of Energy’s Office of Electricity Delivery and Energy Reliability (DOE-OE) evaluated a novel approach for near real-time consumption of threat intelligence. Demonstration testing in an industry environment supported the development of this new process to assist the electric sector in securing their critical networks. This report provides the reader with an understanding of the methods used during this proof of concept project. The processes and templates were further advanced with an industry partner during an onsite assessment. This report concludes with lessons learned and a roadmap for final development of these materials for use by industry.

  5. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    1 Appliances in Homes in West Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"West Census Region" ,,,"Mountain Census Division",,,,,,,"Pacific Census Division" ,,,,"Mountain North Sub-Division",,,"Mountain South Sub-Division" ,"Total U.S.1 (millions)",,,"Total Mountain North",,,"Total Mountain South" ,,"Total West","Total Mountain",,,"ID, MT, UT,

  6. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    0 Appliances in Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East South Central Census Division",,,"West South Central Census Division" ,,,,,,,,,"Total East South Central",,,"Total West South Central" ,"Total U.S.1 (millions)",,"Total South Atlantic" ,,"Total South",,,,,"DC, DE, MD,

  7. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    Appliances in U.S. Homes, by Housing Unit Type, 2009" " Million Housing Units, Final" ,,"Housing Unit Type" ,,"Single-Family Units",,"Apartments in Buildings With" ,"Total U.S.1 (millions)" ,,,,,"5 or More Units","Mobile Homes" "Appliances",,"Detached","Attached","2 to 4 Units" "Total Homes",113.6,71.8,6.7,9,19.1,6.9 "Cooking Appliances" "Stoves (Units With

  8. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    9 Appliances in Homes in Midwest Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Midwest Census Region" ,,,"East North Central Census Division",,,,,"West North Central Census Division" ,,,"Total East North Central",,,,,"Total West North Central" ,"Total U.S.1 (millions)" ,,"Total Midwest",,,,," IN, OH",,,"IA, MN, ND, SD"

  9. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    4 Appliances in U.S. Homes, by Number of Household Members, 2009" " Million Housing Units, Final" ,,"Number of Household Members" ,"Total U.S.1 (millions)" ,,,,,,"5 or More Members" "Appliances",,"1 Member","2 Members","3 Members","4 Members" "Total Homes",113.6,31.3,35.8,18.1,15.7,12.7 "Cooking Appliances" "Stoves (Units With Both" "an Oven and a Cooktop)"

  10. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    6 Appliances in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold/","Mixed- Humid","Mixed-Dry/" "Appliances",,"Cold",,"Hot-Dry","Hot-Humid","Marine" "Total Homes",113.6,38.8,35.4,14.1,19.1,6.3 "Cooking Appliances" "Stoves (Units With Both" "an Oven and a Cooktop)"

  11. " Million Housing Units, Final"

    U.S. Energy Information Administration (EIA) Indexed Site

    7 Appliances in U.S. Homes, by Census Region, 2009" " Million Housing Units, Final" ,"Total U.S.1 (millions)","Census Region" "Appliances",,"Northeast","Midwest","South","West" "Total Homes",113.6,20.8,25.9,42.1,24.8 "Cooking Appliances" "Stoves (Units With Both" "an Oven and a Cooktop)" "Use a Stove",102.3,19.2,23.9,38.2,20.9

  12. Dynamical properties of disordered systems. Final report

    SciTech Connect (OSTI)

    Orbach, R.L.; Kennel, C.; Cinderella, A.

    1984-05-21

    This final report covers the most recent period of the Office of Navy Research Contract titled DYNAMIC PROPERTIES OF DISORDERED SYSTEMS. During this period, research has been completed on a variety of research problems contained in this ONR Research Proposal. The principal areas of research can be summarized under the following categories: 1) The fractal interpretation of amorphous structures; 2) Non-linear conductivity of low dimensional materials; 3) The effect of anodization on the superconducting transition temperature; 4) The time dependence of the remanent magnetization of spin glasses; and 5) The experimental opportunities for physics at high magnetic fields.

  13. 1990 Weatherization Assistance Program monitoring. Final report

    SciTech Connect (OSTI)

    Samuels, L.S.

    1992-06-19

    The fiscal year 1990 DOE weatherization programs were monitored in Indiana, Ohio, and Wisconsin. The focus of the monitoring was on a total of 18 subgrantees. Separate reports on the monitoring completed on each site was submitted as well as the final summary report for each state. The scope of monitoring consisted of a review of current contracts, budgets, program operating procedures, staffing, inventory control, financial and procurement procedures, review of client files and audit reports, inspection of completed dwelling units and assessment of monitoring, training, and technical assistance provided by the grantees. A random sampling of completed units were selected and visits were made to inspect these weatherized dwellings.

  14. Final Report: Performance Engineering Research Institute

    SciTech Connect (OSTI)

    Mellor-Crummey, John

    2014-10-27

    This document is a final report about the work performed for cooperative agreement DE-FC02-06ER25764, the Rice University effort of Performance Engineering Research Institute (PERI). PERI was an Enabling Technologies Institute of the Scientific Discovery through Advanced Computing (SciDAC-2) program supported by the Department of Energy's Office of Science Advanced Scientific Computing Research (ASCR) program. The PERI effort at Rice University focused on (1) research and development of tools for measurement and analysis of application program performance, and (2) engagement with SciDAC-2 application teams.

  15. Cell Total Activity Final Estimate.xls

    Office of Legacy Management (LM)

    WSSRAP Cell Total Activity Final Estimate (calculated September 2002, Fleming) (Waste streams & occupied cell volumes from spreadsheet titled "cell waste volumes-8.23.02 with macros.xls") Waste Stream a Volume (cy) Mass (g) 2 Radiological Profile 3 Nuclide Activity (Ci) 4 Total % of Total U-238 U-234 U-235 Th-228 Th-230 Th-232 Ra-226 Ra-228 Rn-222 5 Activity if > 1% Raffinate Pits Work Zone (Ci) Raffinate processed through CSS Plant 1 159990 1.49E+11 Raffinate 6.12E+01 6.12E+01

  16. Final Technical Report: Increasing Prediction Accuracy.

    SciTech Connect (OSTI)

    King, Bruce Hardison; Hansen, Clifford; Stein, Joshua

    2015-12-01

    PV performance models are used to quantify the value of PV plants in a given location. They combine the performance characteristics of the system, the measured or predicted irradiance and weather at a site, and the system configuration and design into a prediction of the amount of energy that will be produced by a PV system. These predictions must be as accurate as possible in order for finance charges to be minimized. Higher accuracy equals lower project risk. The Increasing Prediction Accuracy project at Sandia focuses on quantifying and reducing uncertainties in PV system performance models.

  17. Tank waste remediation system risk management list

    SciTech Connect (OSTI)

    Collard, L.B.

    1995-10-31

    The Tank Waste Remedation System (TWRS) Risk Management List and it`s subset of critical risks, the Critical Risk Management List, provide a tool to senior RL and WHC management (Level-1 and -2) to manage programmatic risks that may significantly impact the TWRS program. The programmatic risks include cost, schedule, and performance risks. Performance risk includes technical risk, supportability risk (such as maintainability and availability), and external risk (i.e., beyond program control, for example, changes in regulations). The risk information includes a description, its impacts, as evaluation of the likelihood, consequences and risk value, possible mitigating actions, and responsible RL and WHC managers. The issues that typically form the basis for the risks are presented in a separate table and the affected functions are provided on the management lists.

  18. PRA and Risk Informed Analysis

    SciTech Connect (OSTI)

    Bernsen, Sidney A.; Simonen, Fredric A.; Balkey, Kenneth R.

    2006-01-01

    The Boiler and Pressure Vessel Code (BPVC) of the American Society of Mechanical Engineers (ASME) has introduced a risk based approach into Section XI that covers Rules for Inservice Inspection of Nuclear Power Plant Components. The risk based approach requires application of the probabilistic risk assessments (PRA). Because no industry consensus standard existed for PRAs, ASME has developed a standard to evaluate the quality level of an available PRA needed to support a given risk based application. The paper describes the PRA standard, Section XI application of PRAs, and plans for broader applications of PRAs to other ASME nuclear codes and standards. The paper addresses several specific topics of interest to Section XI. Important consideration are special methods (surrogate components) used to overcome the lack of PRA treatments of passive components in PRAs. The approach allows calculations of conditional core damage probabilities both for component failures that cause initiating events and failures in standby systems that decrease the availability of these systems. The paper relates the explicit risk based methods of the new Section XI code cases to the implicit consideration of risk used in the development of Section XI. Other topics include the needed interactions of ISI engineers, plant operating staff, PRA specialists, and members of expert panels that review the risk based programs.

  19. Risk assessment in international operations

    SciTech Connect (OSTI)

    Stricklin, Daniela L.

    2008-11-15

    During international peace-keeping missions, a diverse number of non-battle hazards may be encountered, which range from heavily polluted areas, endemic disease, toxic industrial materials, local violence, traffic, and even psychological factors. Hence, elevated risk levels from a variety of sources are encountered during deployments. With the emphasis within the Swedish military moving from national defense towards prioritization of international missions in atypical environments, the risk of health consequences, including long term health effects, has received greater consideration. The Swedish military is interested in designing an optimal approach for assessment of health threats during deployments. The Medical Intelligence group at FOI CBRN Security and Defence in Umea has, on request from and in collaboration with the Swedish Armed Forces, reviewed a variety of international health threat and risk assessment models for military operations. Application of risk assessment methods used in different phases of military operations will be reviewed. An overview of different international approaches used in operational risk management (ORM) will be presented as well as a discussion of the specific needs and constraints for health risk assessment in military operations. This work highlights the specific challenges of risk assessment that are unique to the deployment setting such as the assessment of exposures to a variety of diverse hazards concurrently.

  20. Progress toward risk informed regulation

    SciTech Connect (OSTI)

    Rogers, K.C.

    1997-01-01

    For the last several years, the NRC, with encouragement from the industry, has been moving in the direction of risk informed regulation. This is consistent with the regulatory principle of efficiency, formally adopted by the Nuclear Regulatory Commission in 1991, which requires that regulatory activities be consistent with the degree of risk reduction they achieve. Probabilistic risk analysis has become the tool of choice for selecting the best of several alternatives. Closely related to risk informed regulation is the development of performance based rules. Such rules focus on the end result to be achieved. They do not specify the process, but instead establish the goals to be reached and how the achievement of those goals is to be judged. The inspection and enforcement activity is based on whether or not the goals have been met. The author goes on to offer comments on the history of the development of this process and its probable development in the future. He also addresses some issues which must be resolved or at least acknowledged. The success of risk informed regulation ultimately depends on having sufficiently reliable data to allow quantification of regulatory alternatives in terms of relative risk. Perhaps the area of human reliability and organizational performance has the greatest potential for improvement in reactor safety. The ability to model human performance is significantly less developed that the ability to model mechanical or electrical systems. The move toward risk informed, performance based regulation provides an unusual, perhaps unique, opportunity to establish a more rational, more effective basis for regulation.

  1. Energy Impact Illinois - Final Technical Report

    SciTech Connect (OSTI)

    Olson, Daniel; Plagman, Emily; Silberhorn, Joey-Lin

    2014-02-18

    Energy Impact Illinois (EI2) is an alliance of government organizations, nonprofits, and regional utility companies led by the Chicago Metropolitan Agency for Planning (CMAP) that is dedicated to helping communities in the Chicago metropolitan area become more energy efficient. Originally organized as the Chicago Region Retrofit Ramp-Up (CR3), EI2 became part of the nationwide Better Buildings Neighborhood Program (BBNP) in May 2010 after receiving a $25 million award from the U.S. Department of Energy (DOE) authorized through the American Recovery and Reinvestment Act of 2009 (ARRA). The program’s primary goal was to fund initiatives that mitigate barriers to energy efficiency retrofitting activities across residential, multifamily, and commercial building sectors in the seven-county CMAP region and to help to build a sustainable energy efficiency marketplace. The EI2 Final Technical Report provides a detailed review of the strategies, implementation methods, challenges, lessons learned, and final results of the EI2 program during the initial grant period from 2010-2013. During the program period, EI2 successfully increased direct retrofit activity in the region and was able to make a broader impact on the energy efficiency market in the Chicago region. As the period of performance for the initial grant comes to an end, EI2’s legacy raises the bar for the region in terms of helping homeowners and building owners to take action on the continually complex issue of energy efficiency.

  2. Hydrothermal reaction of fly ash. Final report

    SciTech Connect (OSTI)

    Brown, P.W.

    1994-12-31

    The reactions which occur when fly ash is treated under hydrothermal conditions were investigated. This was done for the following primary reasons. The first of these is to determine the nature of the phases that form to assess the stabilities of these phases in the ambient environment and, finally, to assess whether these phases are capable of sequestering hazardous species. The second reason for undertaking this study was whether, depending on the composition of the ash and the presence of selected additives, it would be possible under hydrothermal conditions to form compounds which have cementitious properties. Formation of four classes of compounds, which bracket likely fly ash compositional ranges, were selected for study. The classes are calcium silicate hydrates, calcium selenates, and calcium aluminosulfates, and silicate-based glasses. Specific compounds synthesized were determined and their stability regions assessed. As part of stability assessment, the extent to which selected hazardous species are sequestered was determined. Finally, the cementing properties of these compounds were established. The results obtained in this program have demonstrated that mild hydrothermal conditions can be employed to improve the reactivity of fly ash. Such improvements in reactivity can result in the formation of monolithic forms which may exhibit suitable mechanical properties for selected applications as building materials. If the ashes involved are considered hazardous, the mechanical properties exhibited indicated the forms could be handled in a manner which facilitates their disposal.

  3. Risk Management Techniques and Practice Workshop Workshop Report

    SciTech Connect (OSTI)

    Quinn, T; Zosel, M

    2008-12-02

    vendor technical or business problems. HPC, by its very nature, is an exercise in multi-level risk management. Every aspect of stewarding HPCCs into the petascale era, from identification of the program drivers to the details of procurement actions and simulation environment component deployments, represents unprecedented challenges and requires effective risk management. The fundamental purpose of this workshop was to go beyond risk management processes as such and learn how to weave effective risk management practices, techniques, and methods into all aspects of migrating HPCCs into the next generation of leadership computing systems. This workshop was a follow-on to the Petascale System Integration Workshop hosted by Lawrence Berkeley National Laboratory (LBNL)/NERSC last year. It was intended to leverage and extend the risk management experience of the participants by looking for common best practices and unique processes that have been especially successful. This workshop assessed the effectiveness of tools and techniques that are or could be helpful in HPCC risk management, with a special emphasis on how practice meets process. As the saying goes: 'In theory, there is no difference between theory and practice. In practice there is'. Finally, the workshop brought together a network of experts who shared information as technology moves into the petascale era and beyond.

  4. AVLIS Criticality risk assessment

    SciTech Connect (OSTI)

    Brereton, S.J., LLNL

    1998-04-29

    U-235 and uranium depleted in U-235) are cooled and accumulated in solid metallic form in canisters. The collected product and tails material is weighed and transferred into certified, critically safe, shipping containers (DOT specification 6M with 2R containment vessel). These will be temporarily stored, and then shipped offsite either for use by a fuel fabricator, or for disposal. Tails material will be packaged for disposal. A criticality risk assessment was performed for AVLIS IPD runs. In this analysis, the likelihood of occurrence of a criticality was examined. For the AVLIS process, there are a number of areas that have been specifically examined to assess whether or not the frequency of occurrence of a criticality is credible (frequency of occurrence > 10-6/yr). In this paper, we discuss only two of the areas: the separator and canister operations.

  5. Corporate planning for compliance with EPA`s proposed risk management program rule

    SciTech Connect (OSTI)

    Mannan, M.; Keeney, R.C.

    1995-12-31

    On October 20, 1993, the US Environmental Protection Agency (EPA) published in the Federal Register the proposed rule entitled Risk Management Programs for Chemical Accidental Release Prevention (40 CFR 68). Subsequently, on January 31, 1994, EPA published in the Federal Register the finalized list of 77 regulated toxic substances and 63 regulated flammable substances that are to be covered under the rule along with the associated threshold quantities for each substance. This list of substances will dictate which stationary sources will have to comply with the requirements of the proposed risk management program rule. The risk management program rule will most likely be finalized sometime after mid-1995. Covered facilities will then have a total of three years to achieve complete compliance with the requirements of the rule. This paper presents an approach for corporations with multiple sites to develop action plans for implementation of the risk management program rule. The process starts with a determination of which facilities are potentially covered, development of a matrix of requirements that each facility must comply with, and finally, common strategies that may be used in achieving compliance. Thus, a multi-facility corporation can develop a baseline compliance guideline document that individual plants can use in developing and implementing their risk management programs.

  6. Oct 2009 final concurrence letter for BPA | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oct 2009 final concurrence letter for BPA Oct 2009 final concurrence letter for BPA This is in reference to the letter dated January 15,2009, fiom your predecessor, Honorable ...

  7. Work Group Telecon (Final Charters) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Telecon (Final Charters) Work Group Telecon (Final Charters) Meeting Date: April 24, 2012 Documents Available for Download Meeting Agenda (36.94 KB) More Documents & Publications Work Group Telecom (Draft Charters

  8. LLNL Final Design for PDV Measurements of Godiva for Validation...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: LLNL Final Design for PDV Measurements of Godiva for Validation of Multi-Physics Simulation Citation Details In-Document Search Title: LLNL Final Design for PDV ...

  9. EIS-0236-S4: Final Supplemental Programmatic Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    S4: Final Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: Final ... EIS-0236-S4FEISsummary-2008.pdf (3.03 MB) EIS-0236-S4FEISvol1-2008.pdf (15.53 MB) ...

  10. Final Test and Evaluation Results from the Solar Two Project...

    Office of Scientific and Technical Information (OSTI)

    Final Test and Evaluation Results from the Solar Two Project Citation Details In-Document Search Title: Final Test and Evaluation Results from the Solar Two Project You are ...

  11. Final Supplemental Environmental Impact Statement for a Geologic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOEEIS-0250F-S2 and Final En Final Supplemental ...

  12. Microsoft Word - FINAL_Apr07HAB_Summary.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FINAL Meeting Summary April 5 - 6, 2007 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD April 5 - 6, 2007 Clackamas, OR Topics in This Meeting Summary Executive Summary........................................................................................................................................ 1 Welcome and Introductions............................................................................................................................ 3 Approval of November Meeting Summary

  13. EA-1665: Final Environmental Assessment and Finding of No Significant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV...

  14. Final Agenda, March 26 & 27, 2015 Meeting of the Electricity...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    26 & 27, 2015 Meeting of the Electricity Advisory Committee Final Agenda, March 26 & 27, 2015 Meeting of the Electricity Advisory Committee Final agenda for the U.S. Department of ...

  15. Microsoft PowerPoint - 05 Okonski final Project Management Workshop...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Okonski final Project Management Workshop Slides O'Konski Microsoft PowerPoint - 05 Okonski final Project Management Workshop Slides O'Konski Microsoft PowerPoint - 05 Okonski ...

  16. Final Discussion | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    Detector RD PI Meeting files Final Discussion Print Text Size: A A A FeedbackShare Page Final Discussion Session (Borland) .pdf file (130KB) Last modified: 3182013 10:23:38...

  17. Y-12 Final Site-Wide Environmental Impact Statement Approved...

    National Nuclear Security Administration (NNSA)

    Blog Home Field Offices Welcome to the NNSA Production Office NPO News Releases Y-12 Final Site-Wide Environmental Impact Statement Approved Y-12 Final Site-Wide...

  18. EIS-0375: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0375: EPA Notice of Availability of Final Environmental Impact Statement (192.33 KB) More Documents & Publications EIS-0288-S1: EPA Notice of Availability of Final Supplemental ...

  19. Integrated risk information system (IRIS)

    SciTech Connect (OSTI)

    Tuxen, L.

    1990-12-31

    The Integrated Risk Information System (IRIS) is an electronic information system developed by the US Environmental Protection Agency (EPA) containing information related to health risk assessment. IRIS is the Agency`s primary vehicle for communication of chronic health hazard information that represents Agency consensus following comprehensive review by intra-Agency work groups. The original purpose for developing IRIS was to provide guidance to EPA personnel in making risk management decisions. This original purpose for developing IRIS was to guidance to EPA personnel in making risk management decisions. This role has expanded and evolved with wider access and use of the system. IRIS contains chemical-specific information in summary format for approximately 500 chemicals. IRIS is available to the general public on the National Library of Medicine`s Toxicology Data Network (TOXNET) and on diskettes through the National Technical Information Service (NTIS).

  20. Risk Informing Environmental Cleanup Priorities

    Broader source: Energy.gov [DOE]

    Presentation from the 2015 Annual Performance and Risk Assessment (P&RA) Community of Practice (CoP) Technical Exchange Meeting held in Richland, Washington on December 15-16, 2015.