Powered by Deep Web Technologies
Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Supplemental Analysis for the Final Environmental Impact Statement...  

Office of Environmental Management (EM)

Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final Environmental Impact Statement Supplemental Analysis for the Final...

2

EA-1212-SA-01: Final Supplement Analysis  

Broader source: Energy.gov [DOE]

Final Supplement Analysis for the Environmental Assessment for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory

3

EIS-0350-SA-02: Final Supplement Analysis  

Broader source: Energy.gov [DOE]

Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico Supplement Analysis

4

EIS-0225-SA-02: Final Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Final Supplement Analysis 2: Final Supplement Analysis EIS-0225-SA-02: Final Supplement Analysis Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapons Components Hazardous Waste Treatment and Processing Facility This SA specifically addresses the issue of housing liquid processes in a separate building, the elimination of forklift airlocks and overhead hoists from the main HWTPF, the handling of classified material, and the construction of a ramp instead of a shipping dock. DOE/EIS-0225, Final Supplement Analysis for the Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapons Components Hazardous Waste Treatment and Processing Facility (January 2000) More Documents & Publications

5

EA-1812: Final Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Supplement Analysis Final Supplement Analysis EA-1812: Final Supplement Analysis This Supplement Analysis (SA) has been prepared to address changes in the design and operating parameters of the NECO (formerly Haxtun) Wind Farm Project ("original proposed project") in Logan and Phillips Counties, Colorado. In January 2012, the DOE published the Final Environmental Assessment ("DOE/EA-1812") for the original proposed project and published a Finding of No Significant Impact (FONSI) on January 4, 2012. DOE/EA-1812 was conducted to analyze and disclose potential environmental and socioeconomic impacts that would result from the construction and operation of the original proposed project, which received federal funding through a Community Renewable Energy Deployment (CRED) Program grant to

6

SUPPLEMENT ANALYSIS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

812 Supplement Analysis 1 October 2013 812 Supplement Analysis 1 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration Rocky Mountain Customer Service Region OCTOBER 2013 DOE/EA-1812/SA-1 DOE/EA-1812 Supplement Analysis 2 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration

7

SUPPLEMENT ANALYSIS  

Broader source: Energy.gov (indexed) [DOE]

Supplement Analysis 1 October 2013 Supplement Analysis 1 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration Rocky Mountain Customer Service Region OCTOBER 2013 DOE/EA-1812/SA-1 DOE/EA-1812 Supplement Analysis 2 October 2013 SUPPLEMENT ANALYSIS for the FINAL ENVIRONMENTAL ASSESSMENT for NECO (FORMERLY HAXTUN) WIND ENERGY PROJECT LOGAN AND PHILLIPS COUNTIES, COLORADO U. S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office and U.S. Department of Energy Western Area Power Administration

8

Analysis of Salmon and Steelhead Supplementation, 1990 Final Report.  

SciTech Connect (OSTI)

Supplementation or planting salmon and steelhead into various locations in the Columbia River drainage has occurred for over 100 years. All life stages, from eggs to adults, have been used by fishery managers in attempts to establish, rebuild, or maintain anadromous runs. This report summarizes and evaluates results of past and current supplementation of salmon and steelhead. Conclusions and recommendations are made concerning supplementation. Hatchery rearing conditions and stocking methods can affect post released survival of hatchery fish. Stress was considered by many biologists to be a key factor in survival of stocked anadromous fish. Smolts were the most common life stage released and size of smolts correlated positively with survival. Success of hatchery stockings of eggs and presmolts was found to be better if they are put into productive, underseeded habitats. Stocking time, method, species stocked, and environmental conditions of the receiving waters, including other fish species present, are factors to consider in supplementation programs. The unpublished supplementation literature was reviewed primarily by the authors of this report. Direct contact was made in person or by telephone and data compiled on a computer database. Areas covered included Oregon, Washington, Idaho, Alaska, California, British Columbia, and the New England states working with Atlantic salmon. Over 300 projects were reviewed and entered into a computer database. The database information is contained in Appendix A of this report. 6 refs., 9 figs., 21 tabs.

Miller, William H.; Coley, Travis C.; Burge, Howard L.

1990-09-01T23:59:59.000Z

9

Final Supplement Analysis for the Site-Wide Environmental Impact Statement for the Sandia National Laboratories, Sandia, New Mexico  

Broader source: Energy.gov (indexed) [DOE]

81-SA-04 81-SA-04 Final Supplement Analysis for the Final Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico August 2006 U.S. Department of Energy National Nuclear Security Administration Sandia Site Office This page intentionally left blank COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY/NATIONAL NUCLEAR SECURITY ADMINISTRATION TITLE: Final Supplement Analysis for the Final Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (DOE/EIS-0281-SA-04) CONTACT: For further information concerning this Supplement Analysis, contact Ms. Susan Lacy Environmental Team Leader Sandia Site Office National Nuclear Security Administration P. O. Box 5400 Albuquerque, New Mexico 87185-5400 Phone: (505) 845-5542

10

Supplement Analysis  

Broader source: Energy.gov (indexed) [DOE]

Analysis Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington U. S. Department of Energy Richland Operations Office Richland, Washington 99352 July 20 10 This page intentionally left blank. SUMMARY In December 1992, the U.S. Department of Energy (DOE) issued the Final Environmental Impact Statement (EIS) on Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington (DOEIEIS-O119F). The Final EIS analyzed alternatives for decommissioning eight water-cooled, graphite-moderated plutonium-production reactors, located along the Columbia River in Washington State. The eight reactors (B, C, D, DR, F, H, KE and KW), operated between the years 1944 and 197 1, and have been retired from service. The alternatives analyzed in the EIS included the no-

11

Final Supplemental Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1 June 2008 Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Summary U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S1 June 2008 Foreword COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada

12

Supplement Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

blank. SUMMARY In December 1992, the U.S. Department of Energy (DOE) issued the Final Environmental Impact Statement (EIS) on Decommissioning of Eight Surplus Production...

13

EIS-0236-S4: Final Supplemental Programmatic Environmental Impact...  

Energy Savers [EERE]

Final Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex Transformation The National...

14

DOE/EIS-0236/SA-6 Final Supplement Analysis for Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management Programmatic Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

DATE: REPLY TO ATTN OF: DP-45 (G. Palmer, 6-1785) SUBJECT: DETERMINATION OF THE NEED FOR ADDITIONAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) REVIEW TO: Dave Beck, DP-20 As requested in your action memorandum, same subject, I have reviewed the attached Final Supplement Analysis for Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management Programmatic Environmental Impact Statement, dated August 1999. This analysis was prepared in accordance with 10 CFR 1021.314, contains the comments on the draft Supplement Analysis, dated June 1999, and responds to the comments in Appendix D. Based on my review of the six issues analyzed in the Supplement Analysis, I have determined that none of the information and analysis represent substantial changes to the actions

15

SNL/CA Supplement Analysis  

Broader source: Energy.gov (indexed) [DOE]

22-SA-01 22-SA-01 Supplement Analysis for the Final Site-Wide Environmental Assessment for Sandia National Laboratories/California [September 2012] U.S. Department of Energy National Nuclear Security Administration Sandia Site Office This page intentionally left blank COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY/NATIONAL NUCLEAR SECURITY ADMINISTRATION TITLE: Supplement Analysis for the Final Site-Wide Environmental Assessment for Sandia National Laboratories/California (DOE/EA-1422-SA-01) CONTACT: For further information concerning this Supplement Analysis, contact Ms. Susan Lacy Environmental Team Leader Sandia Site Office National Nuclear Security Administration P. O. Box 5400, MS 0184 Albuquerque, New Mexico 87185-5400 Phone: (505) 845-5542

16

EIS-0026-S2: Final Supplemental Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

S2: Final Supplemental Environmental Impact Statement EIS-0026-S2: Final Supplemental Environmental Impact Statement Carlsbad Area Office, Waste Isolation Pilot Plant Disposal...

17

EIS-0030-S: Final Supplemental Environmental Impact Statement...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

30-S: Final Supplemental Environmental Impact Statement EIS-0030-S: Final Supplemental Environmental Impact Statement Bonneville Power Administration Proposed FY 1980 Program,...

18

EIS-0082-S: Final Supplemental Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

S: Final Supplemental Environmental Impact Statement EIS-0082-S: Final Supplemental Environmental Impact Statement The Department of Energy (DOE) limits electronic access to...

19

EIS-0026-S: Final Supplemental Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Final Supplemental Environmental Impact Statement, Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

20

Final Supplemental Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Volume II Appendices A through J U.S. Department of Energy Office of Civilian Radioactive Waste Management DOE/EIS-0250F-S 1 June 2008 ACRONYMS AND ABBREVIATIONS To ensure a more reader-friendly document, the U.S. Department of Energy (DOE) limited the use of acronyms and abbreviations in this Repository supplemental environmental impact statement. In addition, acronyms and abbreviations are defined the first time they are used in each chapter or appendix. The acronyms and abbreviations used in the text of this document are listed below. Acronyms and abbreviations used in tables and figures because of

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Supplement Analysis for the Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components  

Broader source: Energy.gov (indexed) [DOE]

D D E P A R T M E N T O F E N E R G Y U N I T E D S T A T E S O F A M E R I C A SUPPLEMENT ANALYSIS FOR THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONTINUED OPERATION OF THE PANTEX PLANT AND ASSOCIATED STORAGE OF NUCLEAR WEAPON COMPONENTS DOE/EIS-0225/SA-03 United States Department of Energy National Nuclear Security Administration Pantex Site Operations P.O. Box 30030 Amarillo, Texas 79120-0030 February 2003 i Summary The U.S. Department of Energy's (DOE's) National Environmental Policy Act (NEPA) Implementing Procedures at 10 CFR 1021.330(d) require evaluation of its site-wide environmental impact statements (EISs) at least every 5 years by preparation of a supplement analysis (SA), as provided in 10 CFR 1021.314. Based on the SA, a determination is made as to whether the existing EIS remains

22

Supplementation in the Columbia Basin : Summary Report Series : Final Report.  

SciTech Connect (OSTI)

This progress report broadly defines the scope of supplementation plans and activities in the Columbia Basin. It provides the foundation for more detailed analysis of supplementation in subsequent reports in this series. Topics included in this report are: definition of supplementation, project diversity, objectives and performance standards, uncertainties and theory. Since this is a progress report, the content is subject to modification with new information. The supplementation theory will continue to evolve throughout the duration of RASP and beyond. The other topics in this report are essentially complete and are not expected to change significantly. This is the first of a series of four reports which will summarize information contained in the larger, RASP progress and completion reports. Our goal is to make the findings of RASP more accessible by grouping related topics into smaller but complete narratives on important aspects of supplementation. We are planning to publish the following reports under the general title Supplementation in the Columbia River Basin: Part 1, Background, Description, Performance Measures, Uncertainty and Theory; Part 2, Theoretical Framework and Models; Part 3, Planning Guidelines; and Part 4, Regional Coordination of Research and Monitoring. Supplementation is expected to be a major contributor to the planned increase in salmon and steelhead production in the Columbia Basin. The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) uses three approaches to protect and enhance salmon and steelhead in the Columbia Basin: (1) enhance fish production; (2) improve passage in the mainstem rivers; and (3) revise harvest management to support the rebuilding of fish runs (NPPC 1987). The fish production segment calls for a three-part approach focused on natural production, hatchery production, and supplementation. Supplementation is planned to provide over half of the total production increases. The Regional Assessment of Supplementation Project (RASP) was initiated as a result of a request by NPPC to address long-standing concerns about the need to coordinate supplementation research, monitoring and evaluation. Such coordination was also recommended by the Supplementation Technical Work Group. In August 1990, the NPPC gave conditional approval to proceed with the final design of the Yakima Production Project. The Council called on the Bonneville Power Administration (BPA) to fund immediately a supplementation assessment to reevaluate, prioritize and coordinate all existing and planned supplementation monitoring and evaluation activities in the basin. Providing for the participation of the fishery agencies and tribes and others having expertise in this area. RASP addresses four principal objectives: (1) provide an overview of ongoing and planned supplementation activities and identify critical uncertainties associated with supplementation, (2) construct a conceptual framework and model which estimates the potential benefits and risks of supplementation and prioritizes uncertainties, (3) provide guidelines for the development of supplementation projects, (4) develop a plan for regional coordination of research and monitoring. These objectives, once attained, will provide the technical tools fishery managers need to carry out the Council's direction to protect and enhance salmon and steelhead. RASP has further divided the four broad objectives into 12 technical topics: (1) definition of supplementation; (2) description of the diversity of supplementation projects; (3) objectives and performance standards; (4) identification of uncertainties; (5) supplementation theory; (6) development of a conceptual model of supplemented populations; (7) development of spreadsheet model of risks and benefits of supplementation; (8) classification of stocks, streams, and supplementation strategies; (9) regional design of supplementation evaluation and monitoring; (10) guidelines for planning supplementation projects (11) application of the spreadsheet model to supplementation planning; and (12)

United States. Bonneville Power Administration.

1992-12-01T23:59:59.000Z

23

DOE/EIS-0287-SA-01: Supplement Analysis for the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement (June 2005)  

Broader source: Energy.gov (indexed) [DOE]

7 7 -SA-Ol SUPPLEMENT ANALYSIS For The Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement June 2005 United States Department of Energy Idaho Operations Office 1.0 2.0 3.0 4.0 5.0 6.0 DOEÆIS-0287 -SA-O 1 TABLE OF CONTENTS Introduction......................................................................................................................... 4 Background......................................................................................................................... 4 Areas of Review.................................................................................................................. 6 3.1 3.2 3.3 3.4 Proposed Waste Treatment Technology.......... .......................................................

24

EIS-0407-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0407-SA-01: Supplement Analysis Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas This EIS analyzed the potential direct, indirect, and cumulative environmental impacts of the design, construction, and startup of a biomass-to-ethanol and energy production facility--the Biorefinery Project. The Supplement Analysis examines the potential environmental impacts of the Modified Proposed Action and addresses whether the potential environmental impacts are within the range of the potential environmental impacts analyzed in the FEIS. Supplement Analysis for the Final environmental Impact Statement for the Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas (EIS-0407-SA-1) (July 2011)

25

Supplement Analysis Plutonium Consolidation  

Broader source: Energy.gov (indexed) [DOE]

9-SA-4 9-SA-4 SUPPLEMENT ANALYSIS STORAGE OF SURPLUS PLUTONIUM MATERIALS AT THE SAVANNAH RIVER SITE INTRODUCTION AND PURPOSE In April 2002, DOE decided to immediately consolidate long-term storage at the Savannah River Site (SRS) of surplus, non-pit weapons-usable plutonium then stored at the Rocky Flats Environmental Technology Site (RFETS) (DOE, 2002a). That 2002 decision did not affect an earlier DOE decision made in the January 21, 1997, Record of Decision (ROD, DOE, 1997) for the Storage and Disposition of Weapons-Usable Fissile Materials Programmatic Environmental Impact Statement (Storage and Disposition PEIS, DOE, 1996) to continue storage of non-pit surplus plutonium at Hanford, the Idaho National Laboratory (INL), and the Los Alamos

26

EA-1611-S1: Final Supplemental Environmental Assessment | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Environmental Assessment EA-1611-S1: Final Supplemental Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado DOE's Western Area Power...

27

EIS-0350-S1: Final Supplemental Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

Final Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

28

EIS-0317-S1: Final Supplemental Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power Administration is proposing to build a new...

29

Final Supplemental Environmental Assessment (EA-1792)  

Broader source: Energy.gov (indexed) [DOE]

-S1 -S1 FINAL SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT FOR THE UNIVERSITY OF MAINE'S DEEPWATER OFFSHORE FLOATING WIND TURBINE TESTING AND DEMONSTRATION PROJECT Castine US Department of Energy Office of Energy Efficiency and Renewable Energy Golden, Colorado March 2013 DOE/EA-1792-S1 i March 2013 ACRONYMS AND ABBREVIATIONS CMP Central Maine Power CFR Code of Federal Regulations DMR Maine Department of Marine Resources DOE U.S. Department of Energy DPS distinct population segment EA environmental assessment EFH essential fish habitat EMAP Environmental Monitoring and Assessment Program EMF electromagnetic field EPA U.S. Environmental Protection Agency ESA Endangered Species Act FAD fish aggregation device MSA Magnuson-Stevens Fishery Conservation Act

30

EA-1792-S1: Final Supplemental Environmental Assessment | Department of  

Broader source: Energy.gov (indexed) [DOE]

2-S1: Final Supplemental Environmental Assessment 2-S1: Final Supplemental Environmental Assessment EA-1792-S1: Final Supplemental Environmental Assessment DOE's Golden Field Office has prepared this supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine, Maine. This test would be conducted prior to testing at the site 2 miles from Monhegan Island (evaluated under DOE/EA 1792). EA-1792-S1: Final Supplemental Environmental Assessment More Documents & Publications EA-1792-S1: Draft Supplemental Environmental Assessment EA-1792: Draft Environmental Assessment EA-1792-S1: Finding of No Significant Impact

31

EIS-0225-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0225-SA-01: Supplement Analysis Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components - AL-R8 Sealed Insert Container This SA is submitted according to the requirements for determining the need for supplemental EISs (10 CFR 1021.3(4) in DOE's regulations for NEPA implementation. This SA specifically addresses the issue of another type of container for the pit repackaging system. DOE/EIS-0225, Supplement Analysis for Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components - AL-R8 Sealed Insert Container (August 1998) More Documents & Publications EIS-0225-SA-03: Supplement Analysis EIS-0225-SA-04: Supplement Analysis

32

EIS-0287-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0287-SA-01: Supplement Analysis Idaho High-Level Waste and Facilities Disposition DOE/EIS-0287-SA-01: Supplement Analysis for the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement (June 2005). In October 2002, DOE issued the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement that provided an analysis of the potential environmental consequences of alternatives/options for the management and disposition of Sodium Bearing Waste (SBW), High-Level Waste (HLW) calcine, and HLW facilities at the Idaho Nuclear Technology and Engineering Center. DOE/EIS-0287-SA-01: Supplement Analysis for the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement (June 2005)

33

EA-1173-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

73-SA-01: Supplement Analysis 73-SA-01: Supplement Analysis EA-1173-SA-01: Supplement Analysis Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program The Confederated Tribes of the Umatilla Indian Reservation and Oregon Department of Fish and Wildlife propose to expand their monitoring and evaluation for the Grande Ronde spring chinook supplementation program to take additional data on summer steelhead that are trapped at the existing adult collection weirs on the upper Grande Ronde River and Catherine Creek. Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01) (December 2003) More Documents & Publications EA-1173: Final Environmental Assessment EIS-0340: Draft Environmental Impact Statement

34

EIS-0423-S1: Final Supplemental Environmental Impact Statement | Department  

Broader source: Energy.gov (indexed) [DOE]

3-S1: Final Supplemental Environmental Impact Statement 3-S1: Final Supplemental Environmental Impact Statement EIS-0423-S1: Final Supplemental Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury This Final SEIS supplements the January 2011 Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury. It analyzes the potential environmental impact for a facility at and in the vicinity of the Waste Isolation Pilot Plant near Carlsbad, New Mexico. The Final SEIS contains revisions and new information based in part on comments received on the draft SEIS. DOE will consider the environmental impact information presented in the January 2011 Mercury Storage EIS and this SEIS, as well as other factors when making long-term elemental mercury management and

35

EIS-0423-S1: EPA Notice of Availability of Final Supplemental...  

Energy Savers [EERE]

23-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement...

36

EIS-0423-S1: EPA Notice of Availability of Final Supplemental...  

Office of Environmental Management (EM)

Final Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement Long-Term Management and Storage of...

37

Final Supplemental Environmental Impact Statement for a Geologic Repository  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Environmental Impact Statement for a Geologic Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation CorridorDOE/EIS-0250F-S2andFinal Envir Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation CorridorDOE/EIS-0250F-S2andFinal Envir This part of the Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada -- Nevada Rail Transportation Corridor (DOE/EIS-0250F-S2) (Nevada Rail Corridor SEIS)

38

EA-1429-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9-SA-01: Supplement Analysis 9-SA-01: Supplement Analysis EA-1429-SA-01: Supplement Analysis Security Perimeter Project This Supplement Analysis (SA) has been prepared to determine if previous Department of Energy (DOE), National Nuclear Security Administration (NNSA) environmental assessments (EAs), including EA-1429 Environmental Assessment for Proposed Access Control and Traffic Improvements at Los Alamos National Laboratory, Los Alamos, New Mexico adequately address the environmental effects of a proposed modification to the location and alignment of a bypass road at Technical Area (TA) 3, or if this EA or others need to be supplemented. Supplement Analysis Security Perimeter Project, DOE/EA-1429-SA (February 2003) More Documents & Publications EA-1429: Final Environmental Assessment

39

EIS-0220-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0220-SA-01: Supplement Analysis EIS-0220-SA-01: Supplement Analysis EIS-0220-SA-01: Supplement Analysis Seismic Activity on H-Canyon Incorporating up-to-date seismic data, WSRC completed a detailed evaluation of the likelihood of a severe earthquake and the estimated resulting structural damage of H-Canyon. This evaluation indicated that a severe earthquake capable of producing structural damage comparable to that described in the IMNM EIS would not occur more frequently than once in 5500 years. That is less frequent than the severe earthquake occurrence assumed in the IMNM EIS (1/5000 years). DOE/EIS-0220, Supplement Analysis of Seismic Activity on H-Canyon (January 1997) More Documents & Publications EIS-0220-SA-01: Supplement Analysis EIS-0220: Supplemental Record of Decision EIS-0220: Final Environmental Impact Statement

40

EIS-0265-SA-100: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Supplement Analysis EIS-0265-SA-100: Supplement Analysis Oregon Fish Screening Project, Screen Replacements Supplement Analysis for the Watershed Management Program...

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EIS-0312-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-03: Supplement Analysis EIS-0312-SA-03: Supplement Analysis Fish and Wildlife Implementation Plan The attached Supplement Analysis for Bonneville Power Administration's (BPA's)...

42

EIS-0312-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis EIS-0312-SA-01: Supplement Analysis Fish and Wildlife Implementation Plan Supplement Analysis for the Fish and Wildlife Implementation Plan EIS (DOE...

43

EIS-0285-SA-142: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis EIS-0285-SA-142: Supplement Analysis Transmission System Vegetation Management Program Supplement Analysis for the Transmission System Vegetation Management...

44

EIS-0290-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis EIS-0290-SA-02: Supplement Analysis Naval Reactors Facility Sludge Pan Container Disposition Project DOEEIS-0290-SA-02: Supplement Analysis Naval Reactors...

45

EIS-0026-SA-09: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SA-09: Supplement Analysis EIS-0026-SA-09: Supplement Analysis Supplement Analysis for a Proposal to Temporarily Store Defense Transuranic Waste Prior to Disposal at the Waste...

46

EIS-0026-SA-05: Supplement Analysis | Department of Energy  

Office of Environmental Management (EM)

-SA-05: Supplement Analysis EIS-0026-SA-05: Supplement Analysis Waste Isolation Pilot Plant Site Wide Operations, Carlsbad, New Mexico This supplement analysis examines changes to...

47

EIS-0220: Supplemental record of decision and supplement analysis  

Broader source: Energy.gov (indexed) [DOE]

20: Supplemental record of decision and supplement analysis 20: Supplemental record of decision and supplement analysis determination EIS-0220: Supplemental record of decision and supplement analysis determination Interim Management of Nuclear Materials at the Savannah River Site DOE has now further decided, because of health and safety vulnerabilities, to stabilize the remaining TRR spent nuclear fuel located in the Receiving Basin for Offsite Fuels (RBOF) at the SRS, using the F-Canyon and FB-Line facilities. The TRR spent nuclear fuel to be stabilized consists of the equivalent of 310 fuel rods (some of the rods were fragmented due to conditions in Taiwan) in 62 aluminum canisters stored underwater in RBOF. DOE has decided to stabilize the TRR spent nuclear fuel because additional TRR spent fuel in at least two of the canisters has failed, and DOE

48

EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

S4: Final Supplemental Programmatic Environmental Impact S4: Final Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex Transformation The National Nuclear Security Administration (NNSA), an agency within the Department of Energy, has the responsibility to maintain the safety, security, and reliability of the United States' nuclear weapons stockpile. This Complex Transformation Supplemental Programmatic Environmental Impact Statement (SPEIS) analyzes the potential environmental impacts of reasonable alternatives to continue transformation of the nuclear weapons complex to be smaller, and more responsive, efficient, and secure in order to meet national security requirements. EIS-0236-S4_FEIS_summary-2008.pdf EIS-0236-S4_FEIS_vol1-2008.pdf

49

EIS-0290-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0290-SA-03: Supplement Analysis EIS-0290-SA-03: Supplement Analysis EIS-0290-SA-03: Supplement Analysis Disposition of Mixed Low-Level Waste and Low-Level Waste from Advanced Mixed Waste Treatment Project at Commercial Facilities This SA evaluates whether a proposed action to use commercial facilities to dispose of low-level waste and treat and dispose of mixed low-level waste from the Advanced Mixed Waste Treatment Project warrants additional review of the Advanced Mixed Waste Treatment Project Final EIS and the Final Waste Management Programmatic EIS for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste. EIS-0290-SA-03-2013.pdf More Documents & Publications EA-0843: Final Environmental Assessment Chairs Meeting - November 2013 EIS-0310-SA-02: Supplement Analysis

50

EIS-0332-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

332-SA-01: Supplement Analysis 332-SA-01: Supplement Analysis EIS-0332-SA-01: Supplement Analysis McNary-John Day Transmission Line Project McNary-John Day Transmission Line - Review for significant new circumstances or information In 2002, Bonneville Power Administration (BPA) completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (February 2009) More Documents & Publications EIS-0332: Record of Decision EIS-0332: Draft Environmental Impact Statement EIS-0332: Final Environmental Impact Statement

51

EIS-0290-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-03: Supplement Analysis -SA-03: Supplement Analysis EIS-0290-SA-03: Supplement Analysis Disposition of Mixed Low-Level Waste and Low-Level Waste from Advanced Mixed Waste Treatment Project at Commercial Facilities This SA evaluates whether a proposed action to use commercial facilities to dispose of low-level waste and treat and dispose of mixed low-level waste from the Advanced Mixed Waste Treatment Project warrants additional review of the Advanced Mixed Waste Treatment Project Final EIS and the Final Waste Management Programmatic EIS for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste. EIS-0290-SA-03-2013.pdf More Documents & Publications EA-0843: Final Environmental Assessment EIS-0310-SA-02: Supplement Analysis Chairs Meeting - November 2013

52

Recommendations for the Supplement Analysis Process  

Broader source: Energy.gov [DOE]

DOE has prepared this guidance regarding Supplement Analyses.The guidance discusses decisions regarding whether to prepare a Supplement Analysis (SA), the substantive content of the analysis, procedural aspects of preparing an SA, and the outcomes that can result.

53

EIS-0250-S2: Final Supplemental Environmental Impact Statement | Department  

Broader source: Energy.gov (indexed) [DOE]

Final Supplemental Environmental Impact Statement Final Supplemental Environmental Impact Statement EIS-0250-S2: Final Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada The Nevada Rail Corridor SEIS (DOE/EIS-0250F-S2) analyzes the potential impacts of constructing and operating a railroad to connect the Yucca Mountain repository site to an existing rail line near Wabuska, Nevada (in the Mina rail corridor). The Nevada Rail Corridor SEIS analyzes the Mina rail corridor at a level of detail commensurate with that of the rail corridors analyzed in the Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada (DOE/EIS-0250F).

54

Recommendations for the Supplement Analysis Process  

Broader source: Energy.gov (indexed) [DOE]

Recommendations Recommendations for the Supplement Analysis Process July 2005 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Compliance Recommendations for the Supplement Analysis Process July 2005 U.S. Department of Energy Environment, Safety and Health Office of NEPA Policy and Compliance printed on recycled paper Recommendations for the Supplement Analysis Process Contents

55

EIS-0265-SA-90: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Supplement Analysis EIS-0265-SA-90: Supplement Analysis Watershed Management Program Naches River Water Treatment Plant Intake Screening Project (September 2002) Supplement...

56

EIS-0407-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

07-SA-01: Supplement Analysis 07-SA-01: Supplement Analysis EIS-0407-SA-01: Supplement Analysis Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas This EIS analyzed the potential direct, indirect, and cumulative environmental impacts of the design, construction, and startup of a biomass-to-ethanol and energy production facility--the Biorefinery Project. The Supplement Analysis examines the potential environmental impacts of the Modified Proposed Action and addresses whether the potential environmental impacts are within the range of the potential environmental impacts analyzed in the FEIS. Supplement Analysis for the Final environmental Impact Statement for the Proposed Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas (EIS-0407-SA-1) (July 2011)

57

EIS-0225-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5-SA-04: Supplement Analysis 5-SA-04: Supplement Analysis EIS-0225-SA-04: Supplement Analysis Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components This second 5-Year update SA fulfills DOE's requirement to review the SWEIS at least every 5 years as required by 10 CFR 1021.330(d). This SA accomplishes that requirement by comparing the information presented in the SWEIS with changes and proposed changes, through 2011, in the environment and Pantex Plant missions, activities, programs, and impacts. DOE/EIS-0225-SA-04: Supplement Analysis for the Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components (October 2008) More Documents & Publications EIS-0225-SA-05: Supplement Analysis

58

EIS-0310-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0310-SA-01: Supplement Analysis Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States Supplement Analysis for the Programmatic Environmental Impact Statement (PEIS) for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States. The Department of Energy (DOE), pursuant to the National Environmental Policy Act (NEPA), issued the Final PEIS for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility (Nuclear Infrastructure (NI) PEIS, DOE/EIS-0310) in December 2000. Supplement Analysis for the Programmatic Environmental Impact Statement

59

EIS-0247-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0247-SA-01: Supplement Analysis EIS-0247-SA-01: Supplement Analysis EIS-0247-SA-01: Supplement Analysis Proposed Superconducting Linear Accelerator at the Spallation Neutron Source, Oak Ridge, Tennessee A superconducting linear accelerator (linac) is proposed as a replacement for a portion of the ambient-temperature linac currently in the Project Baseline. This Supplement Analysis is conducted to evaluate the environmental impacts associated with the proposed modification in comparison with the environmental impacts analyzed in the SNS Final Environmental Impact Statemetn (FEIS). DOE/EIS-0247, Department of Energy, Oak Ridge Operations, Supplement Analysis of the Proposed Superconducting Linear Accelerator at the Spallation Neutron Source, Oak Ridge, Tennessee (February 2000) More Documents & Publications

60

EIS-0195-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-02: Supplement Analysis -SA-02: Supplement Analysis EIS-0195-SA-02: Supplement Analysis Proposed Silo 3 Alternatives at the FEMP Approval of NEPA Supplemental Analysis for Proposed Silo 3 Alternatives at the FEMP. Final Explanation of Significant Differences for Operable Unit 4 Silo 3 Remedial Action at the Fernald Environmental Management Project, Fernald, Ohio. A Record of Decision for Operable Unit $ (OU4) was signed on December 7, 1994 identifying on-site vitrification and off-site disposal at the U.S. DOE Nevada Test Site (NTS) as the selected remedy for remediation of the silo materials. DOE/EIS-0195-SA-02, Department of Energy, Ohio Field Office, Approval of NEPA Supplemental Analysis for Proposed Silo 3 Alternatives at the FEMP (August 1996), (March 1998) More Documents & Publications

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EIS-0082-S2: Final Supplemental Environmental Impact Statement | Department  

Broader source: Energy.gov (indexed) [DOE]

Final Supplemental Environmental Impact Statement Final Supplemental Environmental Impact Statement EIS-0082-S2: Final Supplemental Environmental Impact Statement Savannah River Site Salt Processing This SEIS evaluates the potential environmental impacts of alternatives for separating the high-activity fraction from the low-activity fraction of the high-level radioactive waste salt solutions now stored in underground tanks at the Savannah River Site (SRS) near Aiken, South Carolina. The high-activity fraction of the high-level waste (HLW) salt solution would then be vitrified in the Defense Waste Processing Facility (DWPF) and stored until it could be disposed of as HLW in a geologic repository. The low activity fraction would be disposed of as low-level waste (saltstone) in vaults at SRS. EIS-0082-S2-2001.pdf

62

EIS-0157-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0157-SA-01: Supplement Analysis EIS-0157-SA-01: Supplement Analysis EIS-0157-SA-01: Supplement Analysis Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore, Oakland Operations Office, Oakland, California Volume I: Main Report This supplement analysis (SA) was prepared in accordance with the requirements of the National Environmental Policy Act of 1969 (NEPA). It considers whether the Final Environmental Impact Statement and Environmental Impact Report for Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore (DOE 1992), hereafter referred to as the "1992 EIS/EIR," should be supplemented, a new environmental impact statement (EIS) should be prepared, or no further NEPA documentation is required. The main body of this SA focuses on the

63

Supplement Analysis for the Watershed Management Program EIS and the Hood River Fisheries Project Final EIS(DOE/EIS-0241) (DOE/EIS-0265/SA-62) (9/14/01)  

Broader source: Energy.gov (indexed) [DOE]

4, 2001 4, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-62) and the Hood River Fisheries Project Final EIS (DOE/EIS-0241). Thomas Morse Fish and Wildlife Project Manager Proposed Action: Hood River Fish Habitat Project Project No: 1998-021-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.16 and 1.17 Spawning and rearing habitat enhancements; 2.1 Maintain healthy riparian plant communities; 4.9 Water conveyance: ditch and canal lining; 4.23 Intake and return diversion screens; 1.13 Culvert removal and replacement. Location: Odell, Hood River County, Oregon Proposed by: Bonneville Power Administration (BPA), Confederated Tribes of the Warms

64

Final Supplemental Environmental Impact Statement for a Geologic Repository  

Broader source: Energy.gov (indexed) [DOE]

- Nevada Rail - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final Env Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada -- Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final Env The Summary of the Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada -- Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final Environmental Impact Statement for a Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County,

65

EA-1422-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-SA-01: Supplement Analysis 2-SA-01: Supplement Analysis EA-1422-SA-01: Supplement Analysis Final Site-Wide Environmental Assessment for Sandia National Laboratories/California This Supplement Analysis (SA) determines whether the 2003 Final Site-Wide Environmental Assessment (SWEA) for Sandia National Laboratories/California (SNL/CA) remains adequate in characterizing potential environmental impacts from the current operation of SNL/CA, and anticipated operation over the next 5 years. The U.S. Department of Energy issued a Finding of No Significant Impact in March 2003 under any of the alternatives evaluated. For this SA, a screening review was performed for each resource area presented in the SWEA, evaluating new or modified projects or proposals, changed circumstances, and new regulations, to determine whether impacts

66

EIS-0332-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0332-SA-01: Supplement Analysis McNary-John Day Transmission Line Project McNary-John Day Transmission Line - Review for significant new circumstances or information In 2002, Bonneville Power Administration (BPA) completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (February 2009) More Documents & Publications EIS-0332: Record of Decision EIS-0332: Draft Environmental Impact Statement EIS-0332: Mitigation Action Plan

67

EIS-0222-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-SA-01: Supplement Analysis 2-SA-01: Supplement Analysis EIS-0222-SA-01: Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact Statement In September 1999 the U.S. Department of Energy (DOE) issued the Final Hanford Comprehensive Land-Use Plan (HCP) Environmental Impact Statement (EIS) (DOE/EIS-0222-F). The HCP EIS analyzed the impacts of alternatives for implementing a land-use plan for the DOE's Hanford Site for at least the next 50-year planning period and lasting for as long as DOE retains legal control of some portion of the real estate. DOE/EIS-0222, Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact Statement (June 2008) More Documents & Publications EIS-0222: Amended Record of Decision EIS-0222: Final Environmental Impact Statement

68

Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192  

SciTech Connect (OSTI)

This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

None

1980-05-01T23:59:59.000Z

69

EIS-0220: Supplemental record of decision and supplement analysis  

Broader source: Energy.gov (indexed) [DOE]

record of decision and supplement analysis record of decision and supplement analysis determination EIS-0220: Supplemental record of decision and supplement analysis determination Interim Management of Nuclear Materials at the Savannah River Site DOE has now further decided, because of health and safety vulnerabilities, to stabilize the remaining TRR spent nuclear fuel located in the Receiving Basin for Offsite Fuels (RBOF) at the SRS, using the F-Canyon and FB-Line facilities. The TRR spent nuclear fuel to be stabilized consists of the equivalent of 310 fuel rods (some of the rods were fragmented due to conditions in Taiwan) in 62 aluminum canisters stored underwater in RBOF. DOE has decided to stabilize the TRR spent nuclear fuel because additional TRR spent fuel in at least two of the canisters has failed, and DOE

70

EA-1562-SA-1: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

562-SA-1: Supplement Analysis 562-SA-1: Supplement Analysis EA-1562-SA-1: Supplement Analysis Final Environmental Assessment of Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington Based on the information provided in this SA, DOE determined that no further NEPA documentation is required for the proposed actions with the analyzed PSF construction site and that the conclusions of the Finding of No Significant Impact signed on January 29, 2007 for the Final Environmental Assessment of the Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington, DOE/EA-1562, remain valid for this action. EA-1562-SA-1-2013.pdf More Documents & Publications EA-1562: Final Environmental Assessment

71

EIS-0315-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5-SA-01: Supplement Analysis 5-SA-01: Supplement Analysis EIS-0315-SA-01: Supplement Analysis Big Sandy Energy Project In June 2001, the Bureau of Land Management (BLM) and Western Area Power Administration (Western) issued the Big Sandy Energy Project Draft Environmental Impact Statement (EIS) (BLM and Western 2001). After June 2001, Caithness Big Sandy, L.L.C. (Caithness), revised aspects of the Big Sandy Energy Project (Project) described as the Proposed Action in the Draft EIS. Since June 2001, BLM and Western have received new information potentially relevant to the identified environmental concerns. Big Sandy Energy Project Supplement Analysis, DOE/EIS-0315-SA-01 (May 2002) More Documents & Publications EA-1853: Final Environmental Assessment EA-1665: Draft Environmental Assessment

72

EIS-0312-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis EIS-0312-SA-02: Supplement Analysis Fish and Wildlife Implementation Plan Columbia Basin Riparian Conservation Easement Program. The action area for the...

73

EIS-0285-SA-134: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis EIS-0285-SA-134: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Bandon-Rogue-Gold Beach transmission...

74

EIS-0285-SA-104: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis EIS-0285-SA-104: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Lynch Creek to LaGrande-Cowlitz No. 1...

75

EIS-0285-SA-101: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis EIS-0285-SA-101: Supplement Analysis Transmission System Vegetation Management Program, Spokane Region Vegetation Management for Substations and Non-Electric...

76

EIS-0285-SA-126: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Supplement Analysis EIS-0285-SA-126: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Alvey Fairview 230kV transmission line...

77

EIS-0285-SA-121: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Murry-Custer No.1 transmission line...

78

EIS-0285-SA-113: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis EIS-0285-SA-113: Supplement Analysis Transmission System Vegetation Management Program To perform remedial vegetation management for keeping vegetation a...

79

EIS-0285-SA-139: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Supplement Analysis EIS-0285-SA-139: Supplement Analysis Transmission System Vegetation Management Program - Little Goose-Lower Granite Corridor Maintenance Vegetation...

80

EIS-0285-SA-112: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis EIS-0285-SA-112: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for portions of the Ross-Alcoa transmission...

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EIS-0285-SA-105: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Supplement Analysis EIS-0285-SA-105: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and...

82

EIS-0285-SA-100: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Supplement Analysis EIS-0285-SA-100: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Libby-Conkelly, 12 to 264...

83

EIS-0285-SA-150: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Supplement Analysis EIS-0285-SA-150: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the East Ellensburg Tap, 16 to 319...

84

EIS-0285-SA-37: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

37: Supplement Analysis EIS-0285-SA-37: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Monroe-Custer No.1 Transmission Line...

85

EIS-0285-SA-34: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

34: Supplement Analysis EIS-0285-SA-34: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the McNary-Ross Transmission Line ROW...

86

EIS-0026-SA-07: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Supplement Analysis EIS-0026-SA-07: Supplement Analysis Waste Isolation Pilot Plant Site-Wide Operations, Carlsbad Field Office The Proposed Action is to continue the...

87

EIS-0350-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SA-01: Supplement Analysis EIS-0350-SA-01: Supplement Analysis Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory, Los Alamos...

88

EIS-0225-SA-05: Supplement Analysis Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis Determination Analysis Determination EIS-0225-SA-05: Supplement Analysis Determination Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components DOE's NNSA Production Office Pantex has prepared a SA to determine whether the Final Environmental Impact Statement for the Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components, also known as the Site-Wide Environmental Impact Statement, adequately addresses the environmental impacts of continued Pantex Plant operations, or if additional documentation under NEPA is needed. EIS-0225-SA-05-Determination-2013.pdf More Documents & Publications EIS-0225-SA-05: Supplement Analysis 2013 Annual Planning Summary for the NNSA Production Office EIS-0225-SA-03: Supplement Analysis

89

Final Supplemental Environmental Impact Statement for a Geologic Repository  

Broader source: Energy.gov (indexed) [DOE]

Nevada Rail Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En Proposed Action: To determine a rail alignment within a rail corridor in which to construct and operate a railroad to transport spent nuclear fuel, high-level radioactive waste, and other materials from an existing railroad in Nevada to a repository at Yucca Mountain, Nye County, Nevada. The Proposed Action includes the construction of railroad construction and operations support facilities. This Rail Alignment EIS analyzes two alternatives that would implement the Proposed Action: the Caliente rail

90

Microsoft Word - supplement Analysis SWEIS82302.doc  

Broader source: Energy.gov (indexed) [DOE]

38SA2 38SA2 Supplement Analysis Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory Modification of Management Methods for Transuranic Waste Characterization at Los Alamos National Laboratory August 13, 2002 Department of Energy National Nuclear Security Administration Los Alamos Site Office Supplement Analysis for the SWEIS Page 1 August 13, 2002 Introduction This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Continued Operations of Los Alamos National Laboratory (SWEIS) (DOE/EIS-0238) adequately addresses the environmental effects of a waste management proposal for installing and operating modular units for the

91

DOE/EIS-0378-SA-01: Supplement Analysis for the Port Angeles-Juan de Fuca Transmission Project Final Environmental Impact Statement (DOE/EIS-0378-SA-01) (02/05/08)  

Broader source: Energy.gov (indexed) [DOE]

February 5, 2008 February 5, 2008 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Port Angeles-Juan de Fuca Transmssion Project Final Environmental Impact Statement (DOE/EIS-0378/SA-01) Mark Korsness Project Manager - TEP TPP-3 Proposed Action: Relocation of the marine exit hole for the horizontal directionally drilled (HDD) hole that would be drilled under the Proposed Action. Proposed by: Sea Breeze Olympic Converter LP (Sea Breeze). Location: Port Angeles Harbor near Port Angeles, Washington. Background: As part of its proposed international transmission cable analyzed in the Port Angeles-Juan de Fuca Transmssion Project EIS, Sea Breeze has proposed the drilling of a HDD hole to transition the cable from the sea bed of the Strait of Juan de Fuca to land. The HDD hole

92

EIS-0246-SA-24: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis 4: Supplement Analysis EIS-0246-SA-24: Supplement Analysis Wildlife Mitigation Program BPA proposes to purchase a conservation easement on approximately 221 acres of the Herbert parcel in Benton County, Oregon for the protection of wetland, riparian, and riverine habitats. The Herbert parcel is located within the Willamette Basin Mitigation Program's Canby Muddy Creek/Mary's River Focus Area southwest of the City of Corvallis. The Herbert site is a cooperative project principally facilitated by BPA, Trust for Public Land, City of Corvallis, and Oregon Department of Fish and Wildlife. Once the conservation easement is finalized, the participants will develop a management plan for the Herbert parcel. Future management actions will likely involve the restoration and enhancement of riparian

93

EIS-0246-SA-23: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EIS-0246-SA-23: Supplement Analysis Wildlife Mitigation Program BPA proposes to purchase a conservation easement on approximately 16 acres of the Canby Ferry parcel in Clackamas County, Oregon for the protection of wetland, riparian, and riverine habitats. This project is part of a multi-agency effort to protect Willamette River frontage and to connect existing Oregon State Park lands with recreational trails. Once the conservation easement is finalized, a management plan will be developed for the Canby Ferry parcel and adjacent parcels, including the Fish Eddy parcel and the Molalla State Park parcel. Future management actions on these lands will likely involve wildlife habitat and riparian area enhancement, restoration, and preservation activities.

94

EIS-0337-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7-SA-01: Supplement Analysis 7-SA-01: Supplement Analysis EIS-0337-SA-01: Supplement Analysis West Valley Demonstration Project Waste Management The Department of Energy's (DOE) West Valley Demonstration Project (WVDP) prepared a final waste management environmental impact statement (WVDP WM ElS) that examined the potential environmental impacts associated with the proposed shipment of radioactive wastes that were either in storage or would be generated over a 10-year period (DOE 2003). Since the EIS was issued, new information has become available regarding the volume and type of low level radioactive waste (LLW), and DOE now proposes to use additional disposal locations for LLW waste for which the transportation impacts were not analyzed in the WVDP WM EIS. West Valley Demonstration Project Waste Management Environmental Impact

95

EIS-0005-FS: Final Supplemental Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

96

EIS-0350-S1: EPA Notice of Availability of the Final Supplemental...  

Broader source: Energy.gov (indexed) [DOE]

the Final Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

97

Final Complex Transformation Supplemental Programmatic Environmental Impact Statement October 2008  

Broader source: Energy.gov (indexed) [DOE]

I I Volume I Chapters 1 - 4 Chapters 1 - 4 DOE/EIS-0236-S4 National Nuclear Security Administration U.S. Department of Energy October 2008 C C CO O OM MP PL LE EXtransfo o or r rm m mat on COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy, National Nuclear Security Administration TITLE: Final Complex Transformation Supplemental Programmatic Environmental Impact Statement (Complex Transformation SPEIS, DOE/EIS-0236-S4) CONTACTS: For further information on this SPEIS, For general information on the DOE write or call: National Environmental Policy Act (NEPA) process, write or call: Theodore A. Wyka Carol Borgstrom, Director Complex Transformation Office of NEPA Policy and Compliance, GC-20 SPEIS Document Manager U.S. Department of Energy Office of Transformation, NA-10.1 1000 Independence Avenue, SW

98

Final Complex Transformation Supplemental Programmatic Environmental Impact Statement October 2008  

Broader source: Energy.gov (indexed) [DOE]

Summary Summary Summary DOE/EIS-0236-S4 National Nuclear Security Administration U.S. Department of Energy October 2008 C C CO O OM MP PL LE EXtransfo o or r rm m mat on COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy, National Nuclear Security Administration TITLE: Final Complex Transformation Supplemental Programmatic Environmental Impact Statement (Complex Transformation SPEIS, DOE/EIS-0236-S4) CONTACTS: For further information on this SPEIS, For general information on the DOE write or call: National Environmental Policy Act (NEPA) process, write or call: Theodore A. Wyka Carol Borgstrom, Director Complex Transformation Office of NEPA Policy and Compliance, GC-20 SPEIS Document Manager U.S. Department of Energy Office of Transformation, NA-10.1 1000 Independence Avenue, SW

99

Final Complex Transformation Supplemental Programmatic Environmental Impact Statement October 2008  

Broader source: Energy.gov (indexed) [DOE]

Volume II Volume II Volume II Chapters 5 - 15 and Chapters 5 - 15 and Appendices A - G Appendices A - G DOE/EIS-0236-S4 National Nuclear Security Administration U.S. Department of Energy October 2008 C C CO O OM MP PL LE EXtransfo o or r rm m mat on COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy, National Nuclear Security Administration TITLE: Final Complex Transformation Supplemental Programmatic Environmental Impact Statement (Complex Transformation SPEIS, DOE/EIS-0236-S4) CONTACTS: For further information on this SPEIS, For general information on the DOE write or call: National Environmental Policy Act (NEPA) process, write or call: Theodore A. Wyka Carol Borgstrom, Director Complex Transformation Office of NEPA Policy and Compliance, GC-20 SPEIS Document Manager U.S. Department of Energy

100

DOE/EIS-0218-SA-3: Supplement Analysis for the Foreign Research Reactor Spent Nuclear Fuel Acceptance Program (November 2004)  

Broader source: Energy.gov (indexed) [DOE]

SUPPLEMENT ANALYSIS FOR THE FOREIGN SUPPLEMENT ANALYSIS FOR THE FOREIGN RESEARCH REACTOR SPENT NUCLEAR FUEL ACCEPTANCE PROGRAM NOVEMBER 2004 DOE/EIS-0218-SA-3 U.S. Department of Energy National Nuclear Security Administration Washington, DC Final Supplement Analysis for the Foreign Research Reactor Spent Nuclear Fuel Acceptance Program Final i TABLE OF CONTENTS Page 1. Introduction.............................................................................................................................................. 1 2. Background .............................................................................................................................................. 1 3. The Proposed Action ...............................................................................................................................

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Supplement Analysis of the 2005 Site-Wide EIS  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy U.S. Department of Energy National Nuclear Security Administration Livermore Site Office Livermore, California SUPPLEMENT ANALYSIS of the 2005 Final Site-wide Environmental Impact Statement For Continued Operation of Lawrence Livermore National Laboratory Volume I: Main Report AUGUST 2011 DOE/EIS-0348-SA-03 i CONTENTS NOTATION.............................................................................................................................. v SUMMARY...........................................................................................................................S-1 1.0 INTRODUCTION ......................................................................................................... 1-1 1.1 Purpose and Need............................................................................................

102

SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC  

Broader source: Energy.gov (indexed) [DOE]

0-SA-02 0-SA-02 September 2013 SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT FOR PLUTONIUM-238 PRODUCTION FOR RADIOISOTOPE POWER SYSTEMS (DOE/EIS-031 0-SA-02) U.S. DEPARTMENT OF ENERGY 1.0 1.6 2.0 3.0 4.0 1.1 1.2 1.3 1.4 1.5 2.1 2.2 2.3 2.4 3.1 3.2 4.1 4.2 TABLE OF CONTENTS INTRODUCTION ............................................................................................................ 1 Overview ........................................................................................................................ . 1 Background ..................................................................................................................... 2 Purpose and Need for this Supplement Analysis ............................................................ 6

103

SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 0-SA-02 1 0-SA-02 September 2013 SUPPLEMENT ANALYSIS FOR THE NUCLEAR INFRASTRUCTURE PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT FOR PLUTONIUM-238 PRODUCTION FOR RADIOISOTOPE POWER SYSTEMS (DOE/EIS-031 0-SA-02) U.S. DEPARTMENT OF ENERGY 1.0 1.6 2.0 3.0 4.0 1.1 1.2 1.3 1.4 1.5 2.1 2.2 2.3 2.4 3.1 3.2 4.1 4.2 TABLE OF CONTENTS INTRODUCTION ............................................................................................................ 1 Overview ........................................................................................................................ . 1 Background ..................................................................................................................... 2 Purpose and Need for this Supplement Analysis ............................................................ 6

104

2005 Supplement Analysis of the INL Site Portion of the April 1995 Programmatic Spent Nuclear Fule Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

03-F-SA-02 03-F-SA-02 2005 SUPPLEMENT ANALYSIS of the INL Site Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement June 2005 United States Department of Energy Idaho Operations Office 1.0. 2.0. 3.0. 3.1. 3.2. 3.3. 3.4. 3.5. 3.6. 4.0. 5.0. 5.1. 5.2. 5.3. 5.3.1. 5.3.2. 5.3.3. 5.3.4. 5.3.5. 5.4. 6.0. 6.1. 6.2. 6.3. 6.3.1. 6.3.2. 6.3.3. 6.3.4. 6.3.5. 6.3.6. 6.3.7. 6.3.8. 6.3.9. 6.3.10. 6.3.11. 6.3.12. 6.3.13. 6.3.14. 6.3.15. 6.3.16. 6.3.17. 6.3.18. DOE/EIS-0203-F-SA-02 Table of Contents EXECUTIVE SUMMARY..................................................................................1 INTRODUCTION..............................................................................................

105

EIS-0200-SA-03: Supplement Analysis | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Laboratory, Carlsbad Field Office (February 2008) More Documents & Publications EIS-0026-S2: Final Supplemental Environmental Impact Statement EIS-0200: Amendment to the...

106

EIS-0281-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis EIS-0281-SA-03: Supplement Analysis Installation of a Petawatt Laser System in TA-IV Department of Energy has identified a need to revitalize High Energy...

107

EIS-0251-SA-01: Supplement Analysis | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EIS-0251-SA-01: Supplement Analysis EIS-0251-SA-01: Supplement Analysis Container System for the Management of DOE Spent Nuclear Fuel Located at the INEEL The Proposed Action...

108

EIs-0285-0455: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIs-0285-0455: Supplement Analysis EIs-0285-0455: Supplement Analysis Transmission System Vegetation Management Program FEIS-- (Bandon-Rogue No. 1) PP&A Project 2178 The project...

109

EIS-0243-SA-02: Supplement Analysis | Department of Energy  

Office of Environmental Management (EM)

-SA-02: Supplement Analysis EIS-0243-SA-02: Supplement Analysis Nevada Test Site and Off-Site Locations in the State of Nevada to Address the Increase in Activities Associated with...

110

EIS-0026-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis EIS-0026-SA-04: Supplement Analysis Use of the 10-160B Transportation Cask for RH-TRU Waste Shipments to WIPP, Carlsbad Field Office DOE is proposing to use...

111

EIS-0218-SA-01: Supplement Analysis | Department of Energy  

Office of Environmental Management (EM)

Analysis EIS-0218-SA-01: Supplement Analysis Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Acceptance Program The objective of this analysis was to determine whether...

112

EIS-0203-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis 2: Supplement Analysis EIS-0203-SA-02: Supplement Analysis INL Site Portion of the April 1995 Programmatic Spent Nuclear Fule Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs This second Supplement Analysis (2005 SA) examined the changes to activities at the INL Site since the 2002 SA. The 2005 Supplement Analysis did not re-do the analyses conducted in the 2002 SA but evaluated actions from that time forward. The 2005 SA reviewed all NEPA documentation prepared since the 2002 Supplement Analysis to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. It also examined INL Site operations program by program to determine what changes had taken place and whether they were

113

EIS-0203-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

203-SA-02: Supplement Analysis 203-SA-02: Supplement Analysis EIS-0203-SA-02: Supplement Analysis INL Site Portion of the April 1995 Programmatic Spent Nuclear Fule Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs This second Supplement Analysis (2005 SA) examined the changes to activities at the INL Site since the 2002 SA. The 2005 Supplement Analysis did not re-do the analyses conducted in the 2002 SA but evaluated actions from that time forward. The 2005 SA reviewed all NEPA documentation prepared since the 2002 Supplement Analysis to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. It also examined INL Site operations program by program to determine what changes had taken place and whether they were

114

EIS-0265-SA-91: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis EIS-0265-SA-91: Supplement Analysis Watershed Management Program - Hood River Fish Habitat (Evans Creek Culvert Replacement) Bonneville Power Administration and the...

115

EIS-0170-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis EIS-0170-SA-01: Supplement Analysis System Operation Review EIS, Bonneville Power Administration, and B.C. Hydro and Power Authority, British Columbia, Canada...

116

EIS-0399-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis EIS-0399-SA-01: Supplement Analysis Montana-Alberta Tie Ltd. 230-kV Transmission Line Project Proposed Action: Modification to relocate four segments of the...

117

EIS-0236-SA-06: Final Supplement Analysis  

Broader source: Energy.gov [DOE]

Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management

118

EIS-0250: Notice of Intent to Prepare a Supplement to the Final...  

Broader source: Energy.gov (indexed) [DOE]

Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Notice of Intent to prepare a Supplement to the Final...

119

EIS-0265-SA-165: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

65-SA-165: Supplement Analysis 65-SA-165: Supplement Analysis EIS-0265-SA-165: Supplement Analysis Watershed Management Program - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence The Bonneville Power Administration is proposing to fund the installation of approximately 1.5 miles of post and wire fence along Valley Creek in Stanley, Idaho. The goal of this project is to enhance salmon and steelhead rearing and migration habitat through exclusion fencing. Supplement Analysis for the Watershed Management Program EIS, - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence, DOE/EIS-0265-SA-165 (August 2004) More Documents & Publications EIS-0265-SA-169: Supplement Analysis EIS-0265-SA-57: Supplement Analysis EIS-0265-SA-58: Supplement Anlalysis

120

MACCS2 Final Gap Analysis  

Broader source: Energy.gov (indexed) [DOE]

MACCS2-Gap Analysis MACCS2-Gap Analysis Defense Nuclear Facilities Safety Board Recommendation 2002-1 Software Quality Assurance Improvement Plan Commitment 4.2.1.3: Software Quality Assurance Improvement Plan: MACCS2 Gap Analysis Final Report U.S. Department of Energy Office of Environment, Safety and Health 1000 Independence Ave., S.W. Washington, DC 20585-2040 May 2004 MACCS2 Gap Analysis May 2004 Final Report INTENTIONALLY BLANK ii MACCS2 Gap Analysis May 2004 Final Report FOREWORD This report documents the outcome of an evaluation of the Software Quality Assurance (SQA) attributes of the radiological dispersion computer code, MACCS2, relative to established software requirements. This evaluation, a "gap analysis", is performed to meet commitment 4.2.1.3 of the

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EIS-0285-SA-123: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EIS-0285-SA-123: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management on Malin-Hilltop. Trees are located under and adjacent to conductors. Should a fire occur, these trees are a hazard to the line and could cause serious damage to the conductors, resulting in significant problems for the transmission grid. BPA plans on controlling these trees by removal. In addition, sagebrush along access roads and within 30 feet of structures will be mowed for fire prevention purposes. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-123) Malin-Hilltop (February 2003) More Documents & Publications EIS-0285-SA-118: Supplement Analysis EIS-0285-SA-133: Supplement Analysis

122

EIS-0285-SA-32: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

32: Supplement Analysis 32: Supplement Analysis EIS-0285-SA-32: Supplement Analysis Watershed Management Program - Walla Walla County, Washington Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. DOE/EIS-0285-SA-32, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Walla Walla County, Washington (November 2001) More Documents & Publications EIS-0285-SA-02: Supplement Analysis EIS-0285-SA-64: Supplement Analysis

123

EIS-0203-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis 4: Supplement Analysis EIS-0203-SA-04: Supplement Analysis Naval Reactors Facility Sludge Pan Container Disposition Project The NRF SPC Disposition Project would provide for the receipt, storage, characterization, certification and preparation of RH-TRU waste for transportation and disposition at WIPP. Currently, the 92 SPCs containing the RH-TRU waste are stored in hot cells and storage areas at NRF. Removing the RH-TRU waste would allow NRF operations to use the hot cells and storage for other projects. DOE/EIS-0203-F-SA-04 & DOE/EIS-0290-SA-02: Supplement Analysis Naval Reactors Facility Sludge Pan Container Disposition Project (May 2009) More Documents & Publications EIS-0203-SA-02: Supplement Analysis EIS-0203-SA-01: Supplement Analysis EIS-0203: Record of Decision

124

EIS-0285-SA-119: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Supplement Analysis 9: Supplement Analysis EIS-0285-SA-119: Supplement Analysis Transmission System Vegetation Management Program, Snohomish-Murray No. 1 Transmission Line Bonneville Power Administration proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will be cleared. Approximately 136 tower sites will be treated. Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119) Snohomish-Murray No. 1 Transmission Line (January 2003) More Documents & Publications EIS-0285-SA-125: Supplement Analysis EIS-0285-SA-124: Supplement Analysis

125

EIS-0246-SA28: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SA28: Supplement Analysis SA28: Supplement Analysis EIS-0246-SA28: Supplement Analysis Wildlife Mitigation Program, Yakima County, Washington BPA proposes to purchase four parcels of private land that total approximately 125 acres located in south-central Washington along the Naches River in Yakima County. Following acquisition, title to the land will be held by The Yakama Nation. The goal of this project is to protect and enhance riparian, wetland, and upland habitats for the benefit of fish and wildlife. DOE/EIS-0246, Bonneville Power Administration and The Yakama Nation, Supplement Analysis for the Wildlife Mitigation Program EIS, Yakima County, Washington (July 2002) More Documents & Publications EIS-0246-SA-29: Supplement Analysis EIS-0246-SA-37: Supplement Analysis EIS-0265-SA-70

126

EA-1374-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EA-1374-SA-03: Supplement Analysis Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project The Bonneville Power Administration (BPA) is funding ongoing research on Caspian terns, double-crested cormorants, and several species of gulls (glaucous-winged, western, California, and ring-billed) begun in 1996. BPA analyzed environmental impacts of the research in an Environmental Assessment (EA) completed in 2001 (DOE/EA-1374). The purpose of this Supplement Analysis (SA) is to determine if a supplemental EA is needed to analyze additional research activities proposed as part of that project. Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project, Supplement Analysis DOE/EA-1374-SA-03 (April 2003)

127

EIS-0169-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0169-SA-03: Supplement Analysis EIS-0169-SA-03: Supplement Analysis EIS-0169-SA-03: Supplement Analysis Yakima Fisheries Project-Use of Washington Department of Fish and Wildlife's Yakima Hatchery and Acclimation and Research Activities, Yakima, Yakima County, Washington, Easton, Kittitas County, Washington The purpose of this Supplement Analysis is to determine if a Supplemental EIS is needed to analyze the use of the WDFW's existing Yakima Hatchery for rearing and possibly incubating coho. Additional acclimation and research activities for coho are also analyzed. DOE/EIS-0169-SA-03, Supplement Analysis for Yakima Fisheries Project-Use of Washington Department of Fish and Wildlife's Yakima Hatchery and Acclimation and Research Activities, Yakima, Yakima County, Washington, Easton, Kittitas County, Washington (March 2000)

128

EIS-0169-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0169-SA-04: Supplement Analysis EIS-0169-SA-04: Supplement Analysis EIS-0169-SA-04: Supplement Analysis Yakima Fisheries Project-Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery Facilities The purpose of this Supplement Analysis is to determine if a Supplemental EIS is needed to analyze the construction/modification upgrades to the Yakima Klickitat Fisheries Project (YKFP) fall chinook and coho experimental facilities at the Prosser and Marion Drain Hatcheries. Construction/modifications are in support of the experimental acclimation, rearing and incubating activities for coho and fall chinook. DOE/EIS-0169-SA-04: Supplement Analysis for Yakima Fisheries Project-Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery Facilities (November 2000)

129

EA-1374-SA-05: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Supplement Analysis 5: Supplement Analysis EA-1374-SA-05: Supplement Analysis Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project The Bonneville Power Administration (BPA) is funding ongoing research on Caspian terns, double-crested cormorants, and several species of gulls (glaucous-winged, western, California, and ring-billed) begun in 1996. BPA analyzed environmental impacts of the research in an Environmental Assessment (EA) completed in 2001 (DOE/EA-1374). The purpose of this Supplement Analysis (SA) is to determine if a supplemental EA is needed to analyze additional research activities proposed as part of that project. Avian Predation on Juvenile Salmonids in the Lower Columbia River Research Project, Supplement Analysis DOE/EA-1374-SA-05 (March 2006)

130

EIS-0082-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SA-01: Supplement Analysis SA-01: Supplement Analysis EIS-0082-SA-01: Supplement Analysis Salt Processing Alternatives at the Savannah River Site, Savannah River Operations Office, Aiken, South Carolina The purpose of this Supplement Analysis (SA) is to evaluate the potential impacts associated with the proposed modified processing and disposition pathway and compare those impacts with those described in the SPA SEIS to determine if the SPA SEIS should be supplemented. Interim Salt Processing followed by High Capacity Salt Processing would result in processing and disposal of actinides in slightly higher concentrations than those evaluated in the SPA SEIS. DOE/EIS-0082-S2-SA-01: Supplement Analysis for Salt Processing Alternatives at the Savannah River Site, Savannah River Operations Office, Aiken, South

131

EIS-0075-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis 2: Supplement Analysis EIS-0075-SA-02: Supplement Analysis Strategic Petroleum Reserve, New Orleans, Louisiana General site information for all current, existing expansion, and proposed new SPR sites has been derived from the Site Environmental Report or Environmental Impact Statement for expansion and is provided in the subsections below. Facilities have been described along with the applicable NEPA documentation. Site descriptions properly include the discussions of the surrounding environment as well as site location and history. DOE-SPR-EIS-0075-SA-02: Operational and Engineering Modifications and Regulatory Review Supplemental Analysis of Site-Specific and Programmatic Environmental Impact Statements, Strategic Petroleum Reserve, New Orleans, Louisiana (September 2009)

132

EIS-0075-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

075-SA-02: Supplement Analysis 075-SA-02: Supplement Analysis EIS-0075-SA-02: Supplement Analysis Strategic Petroleum Reserve, New Orleans, Louisiana General site information for all current, existing expansion, and proposed new SPR sites has been derived from the Site Environmental Report or Environmental Impact Statement for expansion and is provided in the subsections below. Facilities have been described along with the applicable NEPA documentation. Site descriptions properly include the discussions of the surrounding environment as well as site location and history. DOE-SPR-EIS-0075-SA-02: Operational and Engineering Modifications and Regulatory Review Supplemental Analysis of Site-Specific and Programmatic Environmental Impact Statements, Strategic Petroleum Reserve, New Orleans,

133

EIS-0265-SA-163: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program, which includes projects to improve watershed conditions, resulting in improved fish and wildlife habitat. DOEEIS-0265-SA-163: Supplement Analysis for the Watershed...

134

EIS-0250-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Geologic Repository for the Disposal of Spent Nuclear and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada This Supplement Analysis examines the potential...

135

EIS-0285-SA-06: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Vegetation Management of annual weeds on seven acres of Bonneville Power Administration (BPA) owned pastureland at the Walla Walla Substation (April 2001) Supplement Analysis for...

136

EIS-0169-SA-05: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

modified to include a hatchery control line, maintained entirely by spawning hatchery-origin fish. DOEEIS-0169-SA-05, Supplement Analysis for YakimaKlickitat Fisheries Project,...

137

EIS-0285-SA-103: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

structures that may impede the operation and maintenance of the subject transmission line. DOeEIS-0285, Bonneville Power Administration, Supplemental Analysis for...

138

EIS-0285-SA-61: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Vegetation Management along the Bell-Boundary No.3, 844 to 961 Transmission Line ROW. (April 2002) (DOEEIS-0285SA-61) Supplement Analysis for the Transmission System...

139

EA-1282-SA-03: Supplement Analysis | Department of Energy  

Energy Savers [EERE]

In March 2002 BPA categorically excluded dredging behind Dam 5 at the Leavenworth Fish Hatchery in connection with the project Memorandum, Supplement Analysis for the...

140

EIS-0285-SA-132: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Vegetation Management for portion of the Big Eddy - Ostrander 1 500 kV transmission line located from tower structure 312 to 393 Supplement Analysis for the...

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE/EIS-0203-SA-01; Supplement Analysis of the INEEL Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Operations Office 850 Energy Drive Idaho Falls, Idaho 83401-1563 November 2002 SUBJECT: Conclusions of the Supplement Analysis of the DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs EIS (1995 EIS) ~ Dear Citizen: The Record of Decision (ROD) for the DOE Programmatic Spent Nuclear Fuel Management and INEL Environmental Restoration and Waste Management Programs EIS (1995 EIS) left several decisions concerning INEEL proposed actions outstanding. That is, decisions were deferred .pending further project definition, funding priorities, or appropriate review under NEPA" In May 2000 a team of DOE-ID program representatives and subject area technical specialists (interdisciplinary

142

EIS-0169-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0169-SA-02: Supplement Analysis EIS-0169-SA-02: Supplement Analysis EIS-0169-SA-02: Supplement Analysis Yakima Fisheries Project-Natural Spawning Channels, Increased On-site Housing, and Upgrades to the Prosser Hatchery. Cle Elum Supplementation and Research Facility, Cle Elum, Washington The Yakima Fisheries Project is co-managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). The project consists of the collection of salmonid broodstock, incubation of eggs and rearing of fry in hatcheries, the acclimation and release of smolts, and related ecological studies in the study of natural production. DOE/EIS-0169-SA-02: Supplement Analysis for Yakima Fisheries Project-Natural Spawning Channels, Increased On-site Housing, and Upgrades to the Prosser Hatchery. Cle Elum Supplementation and Research Facility,

143

EA-1440-S1: Final Supplement to the Site-Wide Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

Final Supplement to the Site-Wide Environmental Final Supplement to the Site-Wide Environmental Assessment EA-1440-S1: Final Supplement to the Site-Wide Environmental Assessment National Renewable Energy Laboratory's South Table Mountain Complex, Golden Field Office, National Renewable Energy Laboratory The Department of Energy (DOE) is proposing an action consisting of three site development projects at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site at Golden, Colorado: Construction of the Research Support Facilities (RSF), a new office building or multi-building office complex; Installation of Phase 1 of planned Site Infrastructure Improvements (Phase 1 of Full Site Development); Upgrades to the Thermochemical User Facility (TCUF), TCUF High Bay area, and addition

144

EIS-0203-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

03-SA-01: Supplement Analysis 03-SA-01: Supplement Analysis EIS-0203-SA-01: Supplement Analysis INEEL Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management This Supplement Analysis used four primary methods for determining whether the 1995 EIS remains adequate. 1) Review of all NEPA documentation prepared in the last five years to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. 2) Examination of INEEL operations program by program to determine what changes had taken place and whether they were within the analyzed scope of the 1995 EIS. 3) Review of changes, if any, in each environmental discipline that was analyzed in the 1995 EIS.

145

EIS-0203-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0203-SA-01: Supplement Analysis INEEL Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management This Supplement Analysis used four primary methods for determining whether the 1995 EIS remains adequate. 1) Review of all NEPA documentation prepared in the last five years to determine what operations have already received NEPA analysis and where previously existing analysis had been supplemented. 2) Examination of INEEL operations program by program to determine what changes had taken place and whether they were within the analyzed scope of the 1995 EIS. 3) Review of changes, if any, in each environmental discipline that was analyzed in the 1995 EIS.

146

EIS-0218-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

218-SA-03: Supplement Analysis 218-SA-03: Supplement Analysis EIS-0218-SA-03: Supplement Analysis Foreign Research Reactor Spent Nuclear Fuel Acceptance Program The objective of this analysis is to determine whether a supplement to the FRR SNF EIS is needed. Under the initial Record of Decision (ROD) signed May 13, 1996 and published in the Federal Register on May 17, 1996 (61 FR 25092), only spent fuel of U.S. origin that is irradiated and discharged from foreign research reactors in the eligible nations before May 13, 2006, can be accepted. Eligible spent fuel can be accepted through May 12, 2009. This Supplement Analysis evaluates a proposal to extend the expiration date for irradiation and return of a limited amount of FRR SNF (not to exceed the originally eligible 20 MTHM), and to include SNF from the Replacement

147

EIS-0218-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EIS-0218-SA-03: Supplement Analysis Foreign Research Reactor Spent Nuclear Fuel Acceptance Program The objective of this analysis is to determine whether a supplement to the FRR SNF EIS is needed. Under the initial Record of Decision (ROD) signed May 13, 1996 and published in the Federal Register on May 17, 1996 (61 FR 25092), only spent fuel of U.S. origin that is irradiated and discharged from foreign research reactors in the eligible nations before May 13, 2006, can be accepted. Eligible spent fuel can be accepted through May 12, 2009. This Supplement Analysis evaluates a proposal to extend the expiration date for irradiation and return of a limited amount of FRR SNF (not to exceed the originally eligible 20 MTHM), and to include SNF from the Replacement

148

EIS-0218-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis 4: Supplement Analysis EIS-0218-SA-04: Supplement Analysis U.S. Disposition of Gap Material--Spent Nuclear Fuel NNSA proposes expansion of current efforts under the GTRI FRR SNF Acceptance Program to allow limited quantities of SNF containing U.S.- and non-U.S.-origin HEU to be recovered from foreign countries and managed at DOE sites in the United States. This SA addresses the environmental impacts associated with the transport of this Gap Material SNF to and within the United States and its subsequent disposition. DOE/EIS-0218-SA-4: DOE, National Nuclear Security Administration, Supplement Analysis for the U.S. Disposition of Gap Material--Spent Nuclear Fuel (January 2009) More Documents & Publications EIS-0218: Revised Record of Decision EIS-0218-SA-03: Supplement Analysis

149

EIS-0348-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0348-SA-01: Supplement Analysis Proposed Construction and Operation of Evidence Receiving and Temporary Storage Facilities in Support of the Nuclear and Radiological Attribution Program and Forensic Science Center's Analyses Programs Supplemental Analysis for the Proposed Construction and Operation of Evidence Receiving and Temporary Storage Facilities in Support of the Nuclear and Radiological Atribution Program and Forensic Science Center's Analyses Programs at the Livermore Site. EIS-0348-SA-01; Supplemental Analysis for the Proposed Construction and Operation of Evidence Receiving and Temporary Storage Facilities in Support of the Nuclear and Radiological Atribution Program and Forensic Science Center's Analyses Programs at the Livermore Site (February 2006)

150

EA-0307-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7-SA-01: Supplement Analysis 7-SA-01: Supplement Analysis EA-0307-SA-01: Supplement Analysis Colville Resident Trout Hatchery Project Supplement Analysis The Bonneville Power Administration prepared an Environmental Assessment (EA-0307) for the Colville Resident Hatchery Project (Project) and published a Finding of No Significant Impact (FONSI) in the Federal Register on September 8, 1986 (Vol. 51, No.173). The Project involved the design, site selection, construction, operation and maintenance of a resident trout hatchery on the Colville Indian Reservation to partially mitigate for anadromours and other fish losses resulting from the the construction and operation of the Chief Joseph Dam and Grand Coulee Dam hydroelectric projects. Colville Resident Trout Hatchery Project Supplement Analysis

151

EIS-0026-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EIS-0026-SA-03: Supplement Analysis Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant The U.S. Department of Energy (DOE) is proposing to revise its approach for managing approximately 0.97 metric tones (MT) of plutonium-bearing materials (containing about 0.18 MT of surplus plutonium) located at the Rocky Flats Environmental Technology Site (RFETS). DOE is proposing to repackage and transport these materials for direct disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. DOE/EIS-0026-SA-03: Supplement Analysis for The Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant (November 2002)) More Documents & Publications EIS-0026-SA-02: Supplement Analysis

152

EIS-0285-SA-448: Supplement Analysis | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-448: Supplement Analysis Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-448) Pearl-Marion No. 1 Transmission Line Corridor) Project No. PP&A # 2049 Vegetation management along the Pearl-Marion #1 500-kV transmission line corridor rights-of-way (ROW) from Pearl Substation to Marion Substation. The corridor includes 4.5 miles of the Ostrander-Pearl #1 and 3 miles of the Big Eddy-Chemawa #1 tranmission line ROW. The corridor ranges from 150 to 562 feet in width and traverses approximately 44 miles of terrain. EIS-0285-SA-448.pdf More Documents & Publications CX-007986: Categorical Exclusion Determination EIS-0285-SA-25: Supplement Analysis CX-008879: Categorical Exclusion Determination

153

EIS-0309-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

09-SA-02: Supplement Analysis 09-SA-02: Supplement Analysis EIS-0309-SA-02: Supplement Analysis Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States The United States (U.S.) Department of Energy (DOE) National Nuclear Security Administration (NNSA) has prepared this Supplement Analysis (SA) for the air and ocean transport of enriched uranium between foreign nations and the United States pursuant to the National Environmental Policy Act (NEPA). It evaluates the environmental impacts associated with transport of enriched uranium from foreign countries to the NNSA Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee (the Proposed Action). Supplement Analysis for the Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States (August 2006)

154

EIS-0075-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0075-SA-01: Supplement Analysis Operational and Engineering Modifications, Regulatory Review, and Socioeconomic Variation, Strategic Petroleum Reserve, New Orleans, Louisiana The purpose of this analysis is threefold: to document changes of National Environmental Policy Act (NEPA) significance to the SPR and to document the changes to environmental laws, regulations, and orders since the original and supplemental Environmental Impact Statements (EIS) documents listed below were prepared, to analyze the impacts of these changes to the original Record(s) Of Decision(s) (RODs) and to detail any recommended additional NEPA actions, if needed. DOE/SPR/EIS-0075-SA-01, Supplement Analysis of Site-Specific and Programmatic Environmental Impact Statements: Operational and Engineering

155

EIS-0281-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis 2: Supplement Analysis EIS-0281-SA-02: Supplement Analysis Sandia National Laboratories/New Mexico Isentropic Compression and Flyer Plate Experiments Involving Plutonium at the Z and Saturn Accelerators This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (SWEIS), DOE/EIS-0281, adequately addresses the environmental effects of a proposal to conduct isentropic compression and flyer plate experiments involving plutonium at the Z and Saturn Accelerators, or if additional documentation under the National Environmental Policy Act (NEPA) is needed. Supplement Analysis for Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico Isentropic Compression and Flyer Plate

156

EIS-0075-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

075-SA-01: Supplement Analysis 075-SA-01: Supplement Analysis EIS-0075-SA-01: Supplement Analysis Operational and Engineering Modifications, Regulatory Review, and Socioeconomic Variation, Strategic Petroleum Reserve, New Orleans, Louisiana The purpose of this analysis is threefold: to document changes of National Environmental Policy Act (NEPA) significance to the SPR and to document the changes to environmental laws, regulations, and orders since the original and supplemental Environmental Impact Statements (EIS) documents listed below were prepared, to analyze the impacts of these changes to the original Record(s) Of Decision(s) (RODs) and to detail any recommended additional NEPA actions, if needed. DOE/SPR/EIS-0075-SA-01, Supplement Analysis of Site-Specific and Programmatic Environmental Impact Statements: Operational and Engineering

157

EIS-0240-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0-SA-01: Supplement Analysis 0-SA-01: Supplement Analysis EIS-0240-SA-01: Supplement Analysis Disposition of Surplus Highly Enriched Uranium This supplement analysis (SA) summarizes the status of HEU disposition activities conducted to date and evaluates the potential impacts of continued program implementation. In addition, this SA considers the potential environmental impacts of proposed new DOE/NNSA initiatives to support the surplus HEU disposition program. Specifically, DOE/NNSA is proposing new end-users for existing program material, new disposal pathways for existing program HEU discard material, and down-blending additional quantities of HEU. DOE/EIS-0240, Supplement Analysis for the Disposition of Surplus Highly Enriched Uranium (October 2007) More Documents & Publications

158

EIS-0285-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

85-SA-02: Supplement Analysis 85-SA-02: Supplement Analysis EIS-0285-SA-02: Supplement Analysis Transmission System Vegetation Management Program Bonneville Power Administration (BPA) proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in accordance with the National Electrical Safety Code and BPA Standards. See Section 1.1 of the attachment. BPA is clearing the danger trees to prevent them from falling or growing into the lines causing outages. Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS(DOE/EIS-0285/SA-02) (March 2001) More Documents & Publications EIS-0285-SA-64: Supplement Analysis CX-010347: Categorical Exclusion Determination

159

EIS-0218-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0218-SA-02: Supplement Analysis EIS-0218-SA-02: Supplement Analysis EIS-0218-SA-02: Supplement Analysis Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Acceptance Program The objective of this analysis was to determine whether a supplement to the orginal FRR SNF EIS was needed. The orginal EIS broadly evaluated the transport by ship of spent nuclear fuel from CNWS to INEEL. This Supplement Analysis examined the potential impacts of accepting foreign research reactor spent nuclear fuel from 41 eligible countries under three scenarios not specifically examined in the orginal EIS. These three scenarios were: (1) accepting FRR SNF that would have been eligible for receipt under criteria set forth in the EIS, but which was not included in the estimated spent fuel inventories for purposes of

160

EIS-0265-SA-75: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0265-SA-75: Supplement Analysis EIS-0265-SA-75: Supplement Analysis EIS-0265-SA-75: Supplement Analysis Watershed Management Program - Gourlay Creek Fish Ladder Project Bonneville Power Administration proposes to fund the construction of a fish passage facility at the Gourlay Creek Dam/water reservoir in Columbia County, Oregon. The City of Scappoose owns and manages close to half of the Gourlay Creek Watershed including high quality habitat above and below the Gourlay Creek Dam. Gourlay Creek Dam has been identified as a key limiting factor in the re-generation of salmon and trout in the Gourlay Creek Watershed. Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-75) - Gourlay Creek Fish Ladder Project (February 2002) More Documents & Publications EIS-0265-SA-59: Supplement Analysis

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

EIS-0281-SA-01: Supplemental Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81-SA-01: Supplemental Analysis 81-SA-01: Supplemental Analysis EIS-0281-SA-01: Supplemental Analysis Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National Laboratories, New Mexico This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (SWEIS) adequately addresses the environmental effects of a proposal for reestablishing long-term pulse mode testing at the Annular Core Research Reactor (ACRR) or if additional documentation under the National Environmental Policy Act (NEPA) is needed. Supplemental Analysis: Site-Wide Environmental Impact Statement For Sandia National Laboratories/New Mexico Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National

162

EIS-0265-SA-99: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Supplement Analysis 9: Supplement Analysis EIS-0265-SA-99: Supplement Analysis Watershed Management Program The overall objective of the project is to restore as much as possible, the natural character and function of the Longley Meadows wetland complex. This project is a joint partnership among the CTUIR, Grand Rhonda Model Watershed Program, Oregon Department of Fish and Wildlife, Natural Resource Conservation Service, U.S. Department of Agriculture, and BPA. This project involves several separate components that are part of a regionwide effort to protect and restore anadromous fish habitat in the Grand Ronde Basin Supplement Analysis for the Watershed Management Program Environmental Impact Statement (November 2002), DOE/EIS-0265-SA-99 More Documents & Publications EA-1173-SA-01: Supplement Analysis

163

EIS-0281-SA-01: Supplemental Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplemental Analysis -SA-01: Supplemental Analysis EIS-0281-SA-01: Supplemental Analysis Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National Laboratories, New Mexico This Supplement Analysis (SA) has been prepared to determine if the Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (SWEIS) adequately addresses the environmental effects of a proposal for reestablishing long-term pulse mode testing at the Annular Core Research Reactor (ACRR) or if additional documentation under the National Environmental Policy Act (NEPA) is needed. Supplemental Analysis: Site-Wide Environmental Impact Statement For Sandia National Laboratories/New Mexico Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National

164

EIS-0309-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

309-SA-02: Supplement Analysis 309-SA-02: Supplement Analysis EIS-0309-SA-02: Supplement Analysis Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States The United States (U.S.) Department of Energy (DOE) National Nuclear Security Administration (NNSA) has prepared this Supplement Analysis (SA) for the air and ocean transport of enriched uranium between foreign nations and the United States pursuant to the National Environmental Policy Act (NEPA). It evaluates the environmental impacts associated with transport of enriched uranium from foreign countries to the NNSA Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee (the Proposed Action). Supplement Analysis for the Air and Ocean Transport of Enriched Uranium between Foreign Nations and the United States (August 2006)

165

EA-1758: Supplement to the Cumulative Impact Analysis | Department of  

Broader source: Energy.gov (indexed) [DOE]

EA-1758: Supplement to the Cumulative Impact Analysis EA-1758: Supplement to the Cumulative Impact Analysis EA-1758: Supplement to the Cumulative Impact Analysis Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon This document presents information supplemental to the Environmental Assessment (EA), Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon (DOE/EA-1758) prepared by the Bureau of Land Management (BLM). This document addresses potential impacts associated with other proposed future geothermal projects in the area of the Newberry National Volcanic Monument that may be cumulative with those described in the EA. Supplement to the Cumulative Impact Analysis of Drilling, Testing, and

166

EA-1758: Supplement to the Cumulative Impact Analysis | Department of  

Broader source: Energy.gov (indexed) [DOE]

: Supplement to the Cumulative Impact Analysis : Supplement to the Cumulative Impact Analysis EA-1758: Supplement to the Cumulative Impact Analysis Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon This document presents information supplemental to the Environmental Assessment (EA), Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon (DOE/EA-1758) prepared by the Bureau of Land Management (BLM). This document addresses potential impacts associated with other proposed future geothermal projects in the area of the Newberry National Volcanic Monument that may be cumulative with those described in the EA. Supplement to the Cumulative Impact Analysis of Drilling, Testing, and

167

EIS-0359-SA-01: Draft Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

59-SA-01: Draft Supplement Analysis 59-SA-01: Draft Supplement Analysis EIS-0359-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. This document includes EIS-0360-SA-01.

168

EIS-0360-SA-01: Draft Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Draft Supplement Analysis -SA-01: Draft Supplement Analysis EIS-0360-SA-01: Draft Supplement Analysis Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE's Inventory of Depleted Uranium Hexafluoride (DOE/EIS-0359-SA-01 and DOE/EIS-0360-SA-01) Pursuant to the National Environmental Policy Act (NEPA), the Department of Energy (DOE or the Department) has prepared this Draft Supplement Analysis (SA) in order to determine whether it must supplement two site-specific Environmental Impact Statements (EISs), or prepare any new EISs, for depleted uranium hexafluoride (DUF6) conversion facilities at Paducah, Kentucky, and Portsmouth, Ohio, in order to decide where it will dispose of the depleted uranium oxide product from these facilities. EIS-0359-SA-01_EIS-0360-SA-01-2007.pdf

169

EIS-0310-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0-SA-02: Supplement Analysis 0-SA-02: Supplement Analysis EIS-0310-SA-02: Supplement Analysis Nuclear Infrastructure Programmatic Environmental Impact Statement Supplement Analysis Determination for Plutonium-238 Production for Radioisotope Power Systems DOE prepared this SA to evaluate the potential environmental impacts associated with its determination that the 2001 ROD offers the optimum approach for production of Pu-238. The SA helped to determine if there are significant new circumstances or information relevant to environmental concerns which would warrant preparation of a supplement to the NI PEIS or a new EIS, or that the 2001 decision can be implemented without any further NEPA review. DOE completed the SA in September 2013 and has made the determination that there are no substantial changes to the original

170

EA-1758-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EA-1758-SA-01: Supplement Analysis Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon DOE is aware of other geothermal actions being pursued in the same general area as those described in the EA. DOE is considering providing financial assistance to partially fund two other projects in the project vicinity for the purpose of promoting renewable energy exploration for geothermal reasons. Supplement to the Cumulative Impact Analysis of : Drilling, Testing, and Monitoring of up to 12 Temperature Gradient/Passive Seismic Geothermal Exploratory Wells Deschutes County, Oregon, DOE/EA-1758 (July 20, 2010) More Documents & Publications EA-1758: Supplement to the Cumulative Impact

171

EIS-1069-SA-07: Supplement Analysis  

Broader source: Energy.gov [DOE]

Yakima/Kilickitat Fisheries Project, Noxious Weed Control at Cle Elum and Jack Creek, Cle Elum Supplementation and Research Facility and Jack Creek Acclimation Site, Kittitas County, Washington

172

Summary Final Long-Term Management and Storage of Elemental Mercury Supplemental Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Environmental Impact Statement Environmental Impact Statement Final LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY Final Supplemental Environmental Impact Statement LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY DOE/EIS-0423-S1 September 2013 SUMMARY AND GUIDE FOR STAKEHOLDERS U.S. Department of Energy Office of Environmental Management Washington, DC AVAILABILITY OF THIS FINAL LONG-TERM MANAGEMENT AND STORAGE OF ELEMENTAL MERCURY SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT For additional information on this Mercury Storage SEIS, contact: David Levenstein, Document Manager Office of Environmental Compliance (EM-11) U.S. Department of Energy Post Office Box 2612 Germantown, MD 20874 Website: http://www.mercurystorageeis.com Printed with soy ink on recycled paper FINAL LONG-TERM MANAGEMENT AND

173

EA-1722-SA-001: Supplement Analysis for an Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

22-SA-001: Supplement Analysis for an Environmental Assessment 22-SA-001: Supplement Analysis for an Environmental Assessment EA-1722-SA-001: Supplement Analysis for an Environmental Assessment Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Lancaster, OH This Supplement Analysis evaluates the potential environmental impacts of the proposed modification to the original design of the Next-Generation Lithium Ion Battery Recycling Facility to approximately 67,000 ft2, would occur within the footprint of the existing Toxco site. The proposed expansion would not significantly change the analysis of impacts for any of the resource areas evaluated in the EA. Therefore, DOE has determined that the proposed change to the project falls within the scope of analysis documented in the EA completed in April 2010.

174

EIS-0380-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-02: Supplement Analysis -SA-02: Supplement Analysis EIS-0380-SA-02: Supplement Analysis Transport and Storage of High-Activity Sealed Sources From Uruguay and Other Locations This supplement analysis (SA) was prepared to assess whether there are substantial changes, or significant new circumstances or information, relevant to environmental concerns associated with continuing the National Nuclear Security Administration's (NNSA's) activities to recover and manage high-activity beta/gamma sealed sources relative to analysis in the Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico (LANL SWEIS) and other relevant National Environmental Policy Act (NEPA) reviews. This SA analyzes an aspect of the Off-Site Source Recovery Project (OSRP) that was not

175

EIS-0285-SA-71: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

85-SA-71: Supplement Analysis 85-SA-71: Supplement Analysis EIS-0285-SA-71: Supplement Analysis Transmission System Vegetation Management Program, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). DOE/EIS-0285-SA-71, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions. (July 2002)

176

EIS-0183-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis 4: Supplement Analysis EIS-0183-SA-04: Supplement Analysis Klondike Wind Project - Power Purchase Agreement, Contract Number 02PB-11093 Near Wasco, Sherman County, Oregon BPA proposes to purchase 24 megawatts (MW) of wind power from the Klondike Wind Project. The existing 24-MW Klondike Wind Project, owned and operated by Northwestern Windpower, LLC is located approximately 7 miles east of the City of Wasco in Sherman County, Oregon. The project already interconnects with the Federal Columbia River Transmission System on BPA's DeMoss-Maupin 69-kv transmission line. Within two years of the execution of the contract, the Point of Delivery may be shifted within the existing developed substation facilities. DOE/EIS-0183, Bonneville Power Administration, Supplement Analysis for the

177

EIS-0238-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8-SA-01: Supplement Analysis 8-SA-01: Supplement Analysis EIS-0238-SA-01: Supplement Analysis Continued Operations of Los Alamos National Laboratory The Department of Energy (DOE), Albuquerque Operations Office, has prepared a Supplemental Analysis (SA) to determine if the Site-Wide Environmental Impact Statement for Continued Operations of Los Alamos National Laboratory (SWEIS) adequately addresses the environmental effects of a proposal for modifying current methods utilized to receive and manage certain offsite unwanted radioactive sealed sources at Los Alamos National Laboratory or if additional documentation under the National Environmental Policy Act (NEPA) is needed.The proposal is entitled Offsite Source Recovery Project (OSRP). DOE/EIS-0238, Department of Energy, Albuquerque Operations Office,

178

EIS-0285-SA-84: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis 4: Supplement Analysis EIS-0285-SA-84: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Monroe-Custer No. 1500kV transmission line from structure 61/1 through structure 88/4. This project includes contemporaneous vegetation management along the Monroe-Custer No. 2 500kV and the Arlington-Bellingham 230kV transmission line corridors which run parallel to the subject transmission line. Corridor width varies from 140 to 825 feet. (All structure locations referenced in this SA refer to the Monroe-Custer No. 1.) The project area is located within Whatcom County, Washington (DOE/EIS-0285/SA 84): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Monroe-Custer No.1 7/1/02 More Documents & Publications

179

EIS-0246-SA-17: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

46-SA-17: Supplement Analysis 46-SA-17: Supplement Analysis EIS-0246-SA-17: Supplement Analysis Wildlife Management Program BPA proposes to partially fund the acquisition of 7,630 acres of shrub-steppe, riparian, and wetland habitat in northern Franklin County, Washington. Title to the land will be transferred initially to The Conservation Fund and ultimately for inclusion as part of the National Wildlife Refuge System. Passive management practices will take place on the land until an official management plan is developed and approved for the property. Some short-term control of invasive, exotic plant species may occur as necessary prior to the approval of a management plan. Bonneville Power Administration, Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-17) September 2001

180

EIS-0285-SA-33: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-33: Supplement Analysis EIS-0285-SA-33: Supplement Analysis EIS-0285-SA-33: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the St Helens-Allston Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line having an easement width of 100 feet. BPA proposes to clear danger trees from varying widths of the indicated transmission line right-of-way that are approaching electrical clearance zones in accordance with the National Electrical Safety Code and BPA Standards. See Section 1.1 of the attached checklist for pertinent information on each section of referenced transmission line. BPA is clearing the danger trees to prevent them from falling or growing into the lines, thereby causing outages. Supplement Analysis for the Transmission System Vegetation Management

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EIS-0246-SA-29: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

29: Supplement Analysis 29: Supplement Analysis EIS-0246-SA-29: Supplement Analysis Wildlife Mitigation Program, on the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington BPA proposes to fund the purchase of three parcels of land within the boundaries of the Spokane Indian Reservation, totaling approximately 870 acres. Title to the land will pass to the Spokane Tribe of Indians. The goal of the property acquisition is to dedicate the land to the protection, mitigation, and enhancement of fish and wildlife affected by the construction and operation of portions of the Federal Columbia River Power System. DOE/EIS-0246, Bonneville Power Administration and The Spokane Tribe of Indians, Supplement Analysis for the Wildlife Mitigation Program EIS, on the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington

182

EIS-0265-SA-67: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0265-SA-67: Supplement Analysis EIS-0265-SA-67: Supplement Analysis EIS-0265-SA-67: Supplement Analysis Watershed Management Program - Install Fish Screens to Protect ESA Listed Steelhead and Bull Trout in the Walla Walla Basin Bonneville Power Administration is proposing to provide cost share for a program that will protect ESA-listed salmonid species in the Walla Walla River Basin through the installation of Washington Department of Fish and Wildlife (WDFW) and National Marine Fisheries Service (NMFS) approved fish screens on up to 197 irrigation diversions in the basin. Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) (10/4/01) - Install Fish Screens to Protect ESA Listed Steelhead and Bull Trout in the Walla Walla Basin More Documents & Publications

183

EIS-0265-SA-101: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0265-SA-101: Supplement Analysis Watershed Management Program BPA proposes to fund a project to enhance fish habitat on Hawley Creek, tributary to the Lemhi River in Idaho, by leasing 7 cubic feet per second (cfs) of water per year for twenty years. The water will be dedicated to instream flow through an agreement with the water right holders and all junior water users. Due partially to irrigation withdrawals, Hawley Creek is often hydrologically disconnected from the Lemhi River. The goal of the proposed project is to leave water instream, to reconnect Hawley Creek to the Lemhi River, to improve habitat and provide passage for chinook salmon, steelhead, and bull trout, and other aquatic species. Supplement Analysis for the Watershed Management Program EIS, DOE/EIS-0265

184

EIS-0246-SA-16: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Supplement Analysis 6: Supplement Analysis EIS-0246-SA-16: Supplement Analysis Wildlife Mitigation Program BPA proposes to purchase three parcels totaling 411 acres of private property on the Coeur d'Alene Indian Reservation as partial mitigation for fish and wildlife impacts caused by the construction and operation of Albeni Falls Dam. Title to the land will be transferred to the Coeur d'Alene Tribe for wildlife habitat protection and enhancement. The goal of this project is to protect, restore, and maintain approximately 2.3 miles of Benewah Creek, its floodplain, and the associated riparian zone as native fish and wildlife habitat. DOE/EIS-0246, Bonneville Power Administration, Supplement Analysis for the Wildlife Mitigation Program EIS (August 2001) More Documents & Publications

185

EIS-0285-SA-140: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

40: Supplement Analysis 40: Supplement Analysis EIS-0285-SA-140: Supplement Analysis Transmission System Vegetation Management Program, Salem-Albany Bonneville Power Administration (BPA) proposes to remove unwanted vegetation along the right-of- way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Supplement Analysis for the Transmission System Vegetation Management

186

EIS-0246-SA-35: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Supplement Analysis 5: Supplement Analysis EIS-0246-SA-35: Supplement Analysis Wildlife Mitigation Program, seven miles east of Juntura, Oregon, Malheur County This review is to ensure that project activities continue to be consistent with the Wildlife Mitigation Program EIS and that there continues to be no effects on endangered species or cultural resources. A Supplement Analysis was completed for the original acquistion of the property and initial project activities. This project would allow the Burns-Pauite Tribe to continue manage 6,500 acres of richly diverse property on the Malheur River while developing a Wildlife Mitigation Plan. A subsequent NEPA process will be conducted for the Wildlife Mitigation Plan. DOE/EIS-0246, Bonneville Power Administration and Burns Paiute Tribe,

187

EIS-0026-SA-06: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Supplement Analysis 6: Supplement Analysis EIS-0026-SA-06: Supplement Analysis Transportation of Transuranic Waste in TRUPACT-III Containers, Carlsbad Field Office This supplement analysis (SA) addresses a proposed action to transport some waste directly to WIPP using a new transportation container design called the Transuranic Package Transporter Model III (TRUPACT-III). TRU waste is waste that contains alpha particle-emitting radionuclides with atomic numbers greater than uranium (92) and half-lives greater than 20 years in concentrations greater than 100 nanocuries per gram of waste. TRU waste is categorized as either contact-handled (CH-TRU) or remote-handled (RH-TRU), based on the radiation level at the surface of the waste container. CH-TRU can be handled directly by trained workers. RH-TRU requires special

188

EIS-0200: DOE Notice of Availability of the Supplement Analysis |  

Broader source: Energy.gov (indexed) [DOE]

200: DOE Notice of Availability of the Supplement Analysis 200: DOE Notice of Availability of the Supplement Analysis EIS-0200: DOE Notice of Availability of the Supplement Analysis Transportation, Storage, Characterization, and Disposal of Transuranic Waste Currently Stored at the Battelle West Jefferson Site Near Columbus, Ohio DOE has prepared a Supplement Analysis (SA) pursuant to DOE regulations implementing the National Environmental Policy Act (NEPA) at 10 CFR 1021.314. The SA addresses DOE's proposal to ship approximately 37 cubic meters (1,307 cubic feet [ft3]) of transuranic (TRU) waste from the Battelle Columbus Laboratory West Jefferson site near Columbus, Ohio, to the Savannah River Site (SRS), a DOE site near Aiken, South Carolina, or to Waste Control Specialists, LLC (WCS), a commercial facility in Andrews,

189

EIS-0285-SA-41: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-41: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region. BPA proposes to clear unwanted vegetation around wood poles and switch platforms. The vegetation clearing around wood poles is for fire protection. Over the last 3 years, BPA has been able to increase reliability and reduce losses due to rangeland fires by applying a soil residual herbicide as a wood pole fire treatment around wood pole structures which provide a 10 to 15 foot vegetation free area at our structure sites. (DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (February 2002) More Documents & Publications

190

EIS-0285-SA-122: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis 2: Supplement Analysis EIS-0285-SA-122: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-of-way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Supplement Analysis for the Transmission System Vegetation Management

191

EIS-0026-SA-08: Supplemental Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

26-SA-08: Supplemental Analysis 26-SA-08: Supplemental Analysis EIS-0026-SA-08: Supplemental Analysis Packaging and Handling of Remote-Handled Transuranic Waste in Shielded Containers, Carlsbad Field Office This supplement analysis (SA) addresses a proposed action to package at the generator sites, and to emplace at the Waste Isolation Pilot Plant (WIPP), a portion of the remote-handled (RH) transuranic (TRU) waste inventory using a new container design called the lead shielded container (hereinafter referred to as the shielded container). In order to increase the efficiency of its operations at WIPP, DOE is proposing a change to the emplacement scheme for a portion of the RH TRU waste inventory. DOE proposes to package a subset of the RH TRU waste streams in shielded containers to be placed in the HalfPACT transport packaging for transport

192

EIS-0246-SA-37: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Supplement Analysis 7: Supplement Analysis EIS-0246-SA-37: Supplement Analysis Wildlife Mitigation Program, On the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington Bonneville Power Administration proposes to fund the purchase of four parcels of land within the boundaries of the Spokane Indian Reservation, totaling approximately 860 acres. Title to the land will pass to the Spokane Tribe of Indians. The goal of the property acquisition is to dedicate the land to the protection, mitigation, and enhancement of fish and wildlife affected by the construction and operation of portions of the Federal Columbia River Power System. DOE/EIS-0246, Bonneville Power Administration and The Spokane Tribe of Indians, Supplement Analysis for the Wildlife Mitigation Program EIS, On

193

EIS-0238-SA-04: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis 4: Supplement Analysis EIS-0238-SA-04: Supplement Analysis Continued Operation of Los Alamos National Laboratory: Recovery and Storage of Strontium-90 (Sr-90) Fueled Radioisotope Thermal Electric Generators at Los Alamos National Laboratory This SA specifically compares key impact assessment parameters of this proposal to the offsite source recovery program evaluated in the SWEIS and a subsequent SA that evaluated a change to the approach of a portion of the recovery program. It also provides an explanation of any differences between the Proposed Action and activities described in the previous SWEIS and SA analyses. DOE/EIS-0238, Supplement Analysis Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory: Recovery and

194

EIS-0285-SA-70: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5-SA-70: Supplement Analysis 5-SA-70: Supplement Analysis EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). DOE/EIS-0285, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions. (July 2002) More Documents & Publications

195

EIS-0285-SA-12: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-12: Supplement Analysis EIS-0285-SA-12: Supplement Analysis EIS-0285-SA-12: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to clear unwanted vegetation in the rights-ofways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. Supplement Analysis for the Transmission System Vegetation Management

196

EIS-0279-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

279-SA-01: Supplement Analysis 279-SA-01: Supplement Analysis EIS-0279-SA-01: Supplement Analysis Savannah River Site Spent Nuclear Fuel Management (DOE/EIS-0279-SA-01 and DOE/EIS-0218-SA-06) This Supplement Analysis evaluates DOE's proposal to change the management method for approximately 3.3 metric tons of heavy metal (MTHM) of aluminum-clad spent nuclear fuel (SNF) from melt and dilute to conventional processing in H-Canyon at the Savannah River Site (SRS) and to down-blend the resultant highly-enriched uranium (HEU) to low enriched uranium (LEU) for use in commercial nuclear reactor fuel. The potential environmental impacts associated with the use of conventional processing, like those associated with the melt and dilute technology, were analyzed in the SRS SNF EIS (DOE/EIS-0279).

197

EIS-0283-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis 2: Supplement Analysis EIS-0283-SA-02: Supplement Analysis Surplus Plutonium Dispostion Program: Waste Solidification Building The National Nuclear Security Administration (NNSA), a separately organized agency within the U.S. Department of Energy (DOE), is proposing to construct and operate a standalone Waste Solidification Building 1 (WSR) in F-Area at the Savannah River Site (SRS) near Aiken, South Carolina. Certain liquid low-level radioactive waste (LLW) and liquid transuranic (TRU) waste expected to be generated in the Mixed Oxide Fuel Fabrication Facility (MFFF) and Pit Disassembly and Conversion Facility (PDCF) as part of the U.S. Surplus Plutonium Disposition Program would be treated and solidified in WSB. DOE/EIS-0283, National Nuclear Security Administration, Supplement Analysis

198

EIS-0285-SA-71: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-71: Supplement Analysis Transmission System Vegetation Management Program, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). DOE/EIS-0285-SA-71, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions. (July 2002)

199

EIS-0283-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3-SA-02: Supplement Analysis 3-SA-02: Supplement Analysis EIS-0283-SA-02: Supplement Analysis Surplus Plutonium Dispostion Program: Waste Solidification Building The National Nuclear Security Administration (NNSA), a separately organized agency within the U.S. Department of Energy (DOE), is proposing to construct and operate a standalone Waste Solidification Building 1 (WSR) in F-Area at the Savannah River Site (SRS) near Aiken, South Carolina. Certain liquid low-level radioactive waste (LLW) and liquid transuranic (TRU) waste expected to be generated in the Mixed Oxide Fuel Fabrication Facility (MFFF) and Pit Disassembly and Conversion Facility (PDCF) as part of the U.S. Surplus Plutonium Disposition Program would be treated and solidified in WSB. DOE/EIS-0283, National Nuclear Security Administration, Supplement Analysis

200

EIS-0246-SA-36: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0246-SA-36: Supplement Analysis EIS-0246-SA-36: Supplement Analysis EIS-0246-SA-36: Supplement Analysis Wildlife Mitigation Program, Grant County, Oregon The compliance checklist for this project was originally completed by the Burns Paiute Tribe in 2000, and meets the standards and guidelines for the Wildlife Mitigation Program Environmental Impact Statement (EIS) and Record of Decision (ROD), as well as the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Logan Valley Wildlife Mitigation Plan, now being implemented, continues to be consistent with the aboved mentioned EISs and RODs. DOE/EIS-0246, Bonneville Power Administration and Burns Paiute Tribe, Supplement Analysis for the Wildlife Mitigation Program EIS, Grant County, Oregon (October 2003)

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EIS-0285-SA-117: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Supplement Analysis 7: Supplement Analysis EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the non-electric portions of the Bonneville Power Administration's Ross Complex. BPA proposes to manage and maintain grounds and landscaping in the non-electrical portions of the Ross Facility. Vegetation management at the Facility shall include: 1) bare ground management of graveled storage areas, perimeter roads and parking areas; 2) mechanical and/or spot herbicide control of some broad leafs and noxious weeds; 3) mowing, fertilizing, and broadleaf control of landscaped lawn areas; 4) weed control in ornamental shrub areas; and 4) areas requiring only mechanical control to manage unwanted grasses, and shrubs. DOE/EIS-0285-SA-117, Bonneville Power Administration, Supplement Analysis

202

EIS-0285-SA-111: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-111: Supplement Analysis Transmission System Vegetation Management Program Tall-growing vegetation that is currently or will soon be a hazard to the line will be removed. Vegetation that will grow tall will be selectively eliminated before it reaches a height or density to begin competing with low-growing species. Cut-stump or follow- up herbicide treatments on re-sprouting-type species will be carried out to ensure that the roots are killed. Desirable low-growing plants will not be disturbed. Only selective vegetation control methods that have little potential to harm non-target vegetation will be used. DOE/EIS-0285, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS

203

EIS-0026-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

026-SA-03: Supplement Analysis 026-SA-03: Supplement Analysis EIS-0026-SA-03: Supplement Analysis Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant The U.S. Department of Energy (DOE) is proposing to revise its approach for managing approximately 0.97 metric tones (MT) of plutonium-bearing materials (containing about 0.18 MT of surplus plutonium) located at the Rocky Flats Environmental Technology Site (RFETS). DOE is proposing to repackage and transport these materials for direct disposal at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico. DOE/EIS-0026-SA-03: Supplement Analysis for The Disposal of Certain Rocky Flats Plutonium-Bearing Materials at the Waste Isolation Pilot Plant (November 2002)) More Documents & Publications

204

EIS-0169-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0169-SA-01: Supplement Analysis EIS-0169-SA-01: Supplement Analysis EIS-0169-SA-01: Supplement Analysis Bonneville Power Administration Yakima Fisheries Project- Fall Chinook and Coho Research Program, Yakima and Klickitat River Basins, Washington BPA, YIN and WDFW are proposing to collect broodstock, incubate eggs and rear fry in hatcheries; acclimate and release smolts; and study the natural production, ecological interactions, long-term fitness, and culturing/genetics of spring and fall chinook and coho salmon in the Yakima River basin. In the Klickitat basin, salmonid life history and physical habitat data would be collected. DOE/EIS-0169-SA-1: Supplement Analysis for Bonneville Power Administration Yakima Fisheries Project- Fall Chinook and Coho Research Program, Yakima and Klickitat River Basins, Washington (May 1999)

205

EIS-0285-SA-120: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Supplement Analysis 0: Supplement Analysis EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington The work will include the performance of road maintenance and tower pad maintenance along the Hanford-Ostrander transmission line. Maintenance will be performed from Tower 10/1, close to Army Loop road near the northeast corner of 200 West Area of the Hanford Nuclear Reservation to the western edge of the Arid Lands Ecological Reserve (ALE) at Tower 17/2 + 700. Total distance of the work is approximately 7.5 miles. The planned work includes spraying with herbicides to minimize vegetation regrowth along the access roads and removing shrubs from within 50 feet of each transmission tower. DOE/EIS-0285, Bonneville Power Administration, Supplement Analysis for the

206

EIS-0285-SA-109: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Supplement Analysis 9: Supplement Analysis EIS-0285-SA-109: Supplement Analysis Transmission System Vegetation Management Program Tall-growing vegetation that is currently or will soon be a hazard to the line will be removed. Vegetation that will grow tall will be selectively eliminated before it reaches a height or density to begin competing with low-growing species. Cut-stump or follow- up herbicide treatments on re-sprouting-type species will be carried out to ensure that the roots are killed. Desirable low-growing plants will not be disturbed. Only selective vegetation control methods that have little potential to harm non-target vegetation will be used. (DOE/EIS-0285, Bonneville Power Administration, Supplement Analysis for the Transmission System Vegetation Management Program FEIS - (Santiam-Alvey # 1

207

EIS-0279-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0279-SA-01: Supplement Analysis Savannah River Site Spent Nuclear Fuel Management (DOE/EIS-0279-SA-01 and DOE/EIS-0218-SA-06) This Supplement Analysis evaluates DOE's proposal to change the management method for approximately 3.3 metric tons of heavy metal (MTHM) of aluminum-clad spent nuclear fuel (SNF) from melt and dilute to conventional processing in H-Canyon at the Savannah River Site (SRS) and to down-blend the resultant highly-enriched uranium (HEU) to low enriched uranium (LEU) for use in commercial nuclear reactor fuel. The potential environmental impacts associated with the use of conventional processing, like those associated with the melt and dilute technology, were analyzed in the SRS SNF EIS (DOE/EIS-0279). Separately, DOE proposes to transport target material, which contains HEU

208

EIS-0265-SA-170: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

feet of streambank along the Yakima River at river mile 8, upstream of the Van Giesen Bridge on SR 224, in and between Richland and West Richland, Washington. Supplement Analysis...

209

EIS-0348-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Laboratory, CA EIS-0348-SA-03a-2011.pdf EIS-0348-SA-03b-2011.pdf More Documents & Publications EIS-0348-SA-03: Supplement Analysis EIS-0380: Draft Site-Wide Environmental Impact...

210

EIS-0285-SA-143: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Vegetation Management for portion of the Custer-Intalco 230 1 kV transmission line located from tower structure 11 to 74 (April 2003) Supplement Analysis for...

211

EIS-0246-SA-18: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

246-SA-18: Supplement Analysis 246-SA-18: Supplement Analysis EIS-0246-SA-18: Supplement Analysis Wildlife Mitigation Program BPA proposes to fund the acquisition and preservation of approximately 99 acres of native wet prairie and oak woodland habitat in Lane County, Oregon. Title to the land will be held by The Nature Conservancy, who will convey permanent mitigation rights to BPA in the form of a conservation easement. These newly acquired parcels will become part of the existing 330-acre Willow Creek Wildlife Mitigation Area. Passive management practices may take place on the land until a wildlife mitigation and management plan is developed and approved for the property. Bonneville Power Administration and The Nature Conservancy, Supplement Analysis for the Wildlife Mitigation Program EIS, EIS-0246-SA-18 (October

212

EIS-0265-SA-94: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Supplement Analysis 4: Supplement Analysis EIS-0265-SA-94: Supplement Analysis Watershed Management Program - Yakima Basin Side Channels Project, Browitt Property Acquisition Bonneville Power Administration proposes to purchase approximately 42 acres of privately-owned land in the Yakima River Basin in Kittitas County, Washington as part of the Yakima River Side Channels Project. The goal of this project is to contribute toward the rebuilding of Yakima Basin spring chinook salmon and steelhead populations by improving survival during their first year of life. This will be accomplished by protecting and restoring off-channel rearing habitats associated with the mainstem of the Yakima River. (DOE/EIS-0265/SA-94): Supplement Analysis for the Watershed Management Program EIS - Yakima Basin Side Channels Project, Browitt Property

213

EIS-0246-SA-36: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Supplement Analysis 6: Supplement Analysis EIS-0246-SA-36: Supplement Analysis Wildlife Mitigation Program, Grant County, Oregon The compliance checklist for this project was originally completed by the Burns Paiute Tribe in 2000, and meets the standards and guidelines for the Wildlife Mitigation Program Environmental Impact Statement (EIS) and Record of Decision (ROD), as well as the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Logan Valley Wildlife Mitigation Plan, now being implemented, continues to be consistent with the aboved mentioned EISs and RODs. DOE/EIS-0246, Bonneville Power Administration and Burns Paiute Tribe, Supplement Analysis for the Wildlife Mitigation Program EIS, Grant County, Oregon (October 2003)

214

EIS-0285-SA-120: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

85-SA-120: Supplement Analysis 85-SA-120: Supplement Analysis EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington The work will include the performance of road maintenance and tower pad maintenance along the Hanford-Ostrander transmission line. Maintenance will be performed from Tower 10/1, close to Army Loop road near the northeast corner of 200 West Area of the Hanford Nuclear Reservation to the western edge of the Arid Lands Ecological Reserve (ALE) at Tower 17/2 + 700. Total distance of the work is approximately 7.5 miles. The planned work includes spraying with herbicides to minimize vegetation regrowth along the access roads and removing shrubs from within 50 feet of each transmission tower. DOE/EIS-0285, Bonneville Power Administration, Supplement Analysis for the

215

EIS-0200: DOE Notice of Availability of the Supplement Analysis |  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Supplement Analysis DOE Notice of Availability of the Supplement Analysis EIS-0200: DOE Notice of Availability of the Supplement Analysis Transportation, Storage, Characterization, and Disposal of Transuranic Waste Currently Stored at the Battelle West Jefferson Site Near Columbus, Ohio DOE has prepared a Supplement Analysis (SA) pursuant to DOE regulations implementing the National Environmental Policy Act (NEPA) at 10 CFR 1021.314. The SA addresses DOE's proposal to ship approximately 37 cubic meters (1,307 cubic feet [ft3]) of transuranic (TRU) waste from the Battelle Columbus Laboratory West Jefferson site near Columbus, Ohio, to the Savannah River Site (SRS), a DOE site near Aiken, South Carolina, or to Waste Control Specialists, LLC (WCS), a commercial facility in Andrews,

216

EIS-0200-SA-01: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-01: Supplement Analysis -SA-01: Supplement Analysis EIS-0200-SA-01: Supplement Analysis Disposal of Contact-Handled Transuranic Waste at the Waste Isolation Pilot Plant (WIPP) DOE is proposing to revise the "where to prepare" decision that was based on the Waste Management Programmatic Environmental Impact Statement, DOE/EIS-0200-F, May 1997 (WM PEIS). The proposed change, as described more fully below, is to create a centralized capability at WIPP that would be used to characterize annually up to 1,250 cubic meters of DOE's contact-handled transuranic (CH-TRU) waste out of about 7,000 cubic meters expected to be received annually for disposal at WIPP. DOE/EIS-0200, Supplement Analysis and Determination for the Proposed Characterization for Disposal of Contact-Handled Transuranic Waste at the

217

EIS-0246-SA-19: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0246-SA-19: Supplement Analysis EIS-0246-SA-19: Supplement Analysis EIS-0246-SA-19: Supplement Analysis Wildlife Mitigation Program BPA proposes to purchase approximately 650 acres of private property that border the St. Joe River near Goose Heaven Lake on the Coeur d'Alene Indian Reservation as partial mitigation for fish and wildlife impacts caused by the construction and operation of Albeni Falls hydroelectric project. Title to the land will be transferred to the Coeur d'Alene Tribe for wildlife habitat protection and enhancement. The goal of this project is to protect and restore riparian, wetland, floodplain and river corridor systems to help enhance water quality and in-stream habitat in the St. Joe Watershed. Bonneville Power Administration and The Nature Conservancy, Supplement

218

EIS-0285-SA-99: Supplement Analysis  

Broader source: Energy.gov [DOE]

Transmission System Vegetation Management Program Final Environmental Impact Statement - Olympia-Grand Coulee No.1

219

EIS-0385-SA-01: Supplement Analysis  

Broader source: Energy.gov [DOE]

Site Selection for the Expansion of the Strategic Petroleum Reserve Final Environmental Impact Statement

220

EIS-0283-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SA-03: Supplement Analysis SA-03: Supplement Analysis EIS-0283-SA-03: Supplement Analysis Transportation of Depleted Uranium Hexafluoride for Conversion to Depleted Uranium Oxide This SA evaluates a proposal to transport cylinders of DUF from the Paducah Gaseous Diffusion Plant in Piketon, Ohio to the AREVA-NP Fuel Fabrication Facility at Richland, Washington, and subsequent transport of cylinders containing DUO from Richland to the SRS. Based on this analysis, DOE's propossed action does not represent substantial changes that are relevant to environmental concerns for DUF-DUO transportation actions evaluated in the SPD EIS and there are no new circumstances or information relevant to environmental concerns that bear on the proposed action or its impacts that would warrant additional NEPA Analysis.

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

EIS-0026-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SA-02: Supplement Analysis SA-02: Supplement Analysis EIS-0026-SA-02: Supplement Analysis Disposal of Polychlorinated Biphenyl-Commingled Transuranic Waste at the Waste Isolation Pilot Plant DOE proposes to dispose of up to 2,500 cubic meters (88,000 cubic feet) of PCB-commingled TRU waste at WIPP. Currently, PCB-commingled TRU waste with a concentration less than 50 parts per million (ppm) is authorized for disposal at WIPP if the waste otherwise meets WIPP's Waste Acceptance Criteria. For purposes of this analysis, DOE assumes that all of its PCB- commingled wastes have PCB concentrations of 500 ppm or more. DOE proposes to characterize and, if necessary, repackage PCB-commingled TRU waste in storage at: INEEL, the Hanford Site4, ORR, RFETS, and SRS5 (as well as KAPL) for disposal at WIPP. DOE would then transport this waste to WIPP by

222

EIS-0340-SA-01: Supplement Analysis  

Broader source: Energy.gov [DOE]

NE Oregon Grande Ronde-Imnaha Spring Chinook Hatchery Project Grande Ronde - Imnaha Spring Chinook Hatchery Project Modifications Resulting from Final Design

223

EIS-0285-SA-141: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-141: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

224

EIS-0285-SA-117: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

85-SA-117: Supplement Analysis 85-SA-117: Supplement Analysis EIS-0285-SA-117: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the non-electric portions of the Bonneville Power Administration's Ross Complex. BPA proposes to manage and maintain grounds and landscaping in the non-electrical portions of the Ross Facility. Vegetation management at the Facility shall include: 1) bare ground management of graveled storage areas, perimeter roads and parking areas; 2) mechanical and/or spot herbicide control of some broad leafs and noxious weeds; 3) mowing, fertilizing, and broadleaf control of landscaped lawn areas; 4) weed control in ornamental shrub areas; and 4) areas requiring only mechanical control to manage unwanted grasses, and shrubs.

225

EIS-0285-SA-27: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Supplement Analysis 7: Supplement Analysis EIS-0285-SA-27: Supplement Analysis Transmission System Vegetation Management Program, Eugene Region Vegetation Management along the Marion-Alvey #1 from structure 14/5 to 64/3 and the Marion-Lane #1 from structure 14/5 to 70/2. Both lines describe the same segment of ROW between structures 14/5 and 45/2. BPA proposes to clear unwanted vegetation in the rights-of-ways, around tower structures, and associated access roads that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the

226

EIS-0285-SA-137: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Supplement Analysis 7: Supplement Analysis EIS-0285-SA-137: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Chemawa-Salem #1 115 kV and #2 230 kV transmission lines from Chemawa Substation to Salem Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have lowgrowing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

227

EIS-0246-SA-34: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

246-SA-34: Supplement Analysis 246-SA-34: Supplement Analysis EIS-0246-SA-34: Supplement Analysis Wildlife Mitigation Program, Flathead County, Montana Bonneville Power Administration proposes to fund the acquisition of approximately 8,500 acres consisting of shrub-steppe rangeland, 1,480 acres of Conservation Reserve Program (CRP)/cropland, 40,000 lineal feet of stream waterfront, 426 acres of main stem riparian habitat, 400 acres of wetlands, and 23.5 miles of tributary streams in Asotin County, Washington. The Schlee Property proposed for acquisition, which is divided into the Smoothing Iron and George Creek parcels, adjoins the Umatilla National Forest, the Washington Department of Fish and Wildlife (WDFW) Asotin Creek Wildlife Area, and other state lands. Title to the land will be held by

228

EIS-0285-SA-11: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-11: Supplement Analysis EIS-0285-SA-11: Supplement Analysis EIS-0285-SA-11: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Covington-Maple Valley No. 2 Transmission Line ROW. BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of- way to control the

229

EIS-0285-SA-28: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-28: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National

230

EIS-0285-SA-43: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

85-SA-43: Supplement Analysis 85-SA-43: Supplement Analysis EIS-0285-SA-43: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines and access roads, including Reclaim and Danger Trees. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA standards. A follow-up

231

EIS-0285-SA-38: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-38: Supplement Analysis EIS-0285-SA-38: Supplement Analysis EIS-0285-SA-38: Supplement Analysis Transmission System Vegetation Management Program Bonneville Power Administration (BPA) proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines and access roads, including Reclaim and Danger Trees. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation. All work will be executed in accordance with the National Electrical Safety Code and BPA

232

EIS-0285-SA-15: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

: Supplement Analysis : Supplement Analysis EIS-0285-SA-15: Supplement Analysis Transmission System Vegetation Manaement Program, the ROWs span sections of Vancouver Washington and Portland Oregon and are all located in the Olympia Region BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. Work also includes clearing of a small (<1/4 mile) section of access road. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for detailed information on each section of the referenced transmission lines. BPA will conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon

233

EIS-0285-SA-13: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening

234

EIS-025-SA-106: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-106: Supplement Analysis -SA-106: Supplement Analysis EIS-025-SA-106: Supplement Analysis Transmission System Vegetation Management Program -106 SnoKing Tap to Monroe-Samamish Line) within Snohomish County, Washington Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments.

235

EIS-0285-SA-118: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-118: Supplement Analysis Transmission System Vegetation Management Program, Holcomb-Naselle 115kV, Pacific County, Washington Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 1.0 miles of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated 30 feet from center of poles and or

236

EIS-0229-SA-03: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

-SA-03: Supplement Analysis -SA-03: Supplement Analysis EIS-0229-SA-03: Supplement Analysis Fabrication of Mixed Oxide Fuel Lead Assemblies in Europe The U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) is proposing to fabricate, on a one-time basis, mixed oxide (MOX) fuel lead assemblies1 in existing facilities in Europe (referred to as Eurofab) rather than at Los Alamos National Laboratory (LANL) as previously decided (65 Federal Register [FR] 1608, January 11, 2000). In May 2000, DOE determined that cost and schedule impacts and programmatic considerations precluded lead assembly fabrication at LANL and discontinued related activities (Holgate 2000). As a result, an initial assessment of alternatives for lead assembly fabrication was conducted by Duke COGEMA Stone & Webster (DCS), the team that was awarded

237

EIS-0246-SA-39: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

SA-39: Supplement Analysis SA-39: Supplement Analysis EIS-0246-SA-39: Supplement Analysis Wildlife Mitigation Program, Pend Oreille County, Washington Bonneville Power Administration (BPA) funds the Albeni Falls Wildlife Mitigation Program, which is tasked with the acquisition and restoration of key habitats within the Pend Oreille Watershed. This mitigation program purchases private land to be owned and managed by program participants for the protection, mitigation, and enhancement of wildlife affected by the construction and operation of the Federal hydroelectric facilities on the Columbia River. BPA is currently working with the Kalispel Tribe of Indians to acquire and manage three parcels that total approximately 890 acres of land within Pend Oreille County, Washington. The properties proposed for

238

EIS-0285-SA-128: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-ofway, access roads and around tower structures along the subject transmission line corridors. Approximately 5 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.5 mile of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and

239

EIS-0246-SA-33: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EIS-0246-SA-33: Supplement Analysis Wildlife Mitigation Program, Flathead County, Montana Bonneville Power Administration is proposing to fund a fish barrier project with Montana Fish, Wildlife, and Parks that proposes to block migrating rainbow trout during spawning to prevent the production and recruitment of approximately 2,500 rainbow trout into the Flathead River system annually. This action will reduce the opportunity for hybridization between rainbow and native westslope cutthroat trout; a species currently under consideration for threatened status under the Endangered Species Act. The project will be accomplished by replacing an existing culvert and retrofitting a fish passage barrier to the bayou. DOE/EIS-0246, Bonneville Power Administration and Montana Fish, Wildlife,

240

EIS-0246-SA-39: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

46-SA-39: Supplement Analysis 46-SA-39: Supplement Analysis EIS-0246-SA-39: Supplement Analysis Wildlife Mitigation Program, Pend Oreille County, Washington Bonneville Power Administration (BPA) funds the Albeni Falls Wildlife Mitigation Program, which is tasked with the acquisition and restoration of key habitats within the Pend Oreille Watershed. This mitigation program purchases private land to be owned and managed by program participants for the protection, mitigation, and enhancement of wildlife affected by the construction and operation of the Federal hydroelectric facilities on the Columbia River. BPA is currently working with the Kalispel Tribe of Indians to acquire and manage three parcels that total approximately 890 acres of land within Pend Oreille County, Washington. The properties proposed for

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

EIS-0285-SA-133: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EIS-0285-SA-133: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Hanford-Ostrander Corridor from structure 126/1 through structure 146/4. Right of way width averages 312 feet. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, and around tower structures along the subject transmission line corridors. Approximately 20 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Access roads and tower sites will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line

242

EIS-0285-SA-21: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-21: Supplement Analysis EIS-0285-SA-21: Supplement Analysis EIS-0285-SA-21: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Noxon-Hot Springs/Taft-Hot Springs 56/3 to 66/7+600 Transmission Line ROW. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of

243

EIS-0246-SA-27: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Supplement Analysis 7: Supplement Analysis EIS-0246-SA-27: Supplement Analysis Wildlife Mitigation Program, Kalispell, Flathead County, Montana BPA proposes to fund a fishery enhancement project where a fish passage barrier will be installed in Abbot Creek to remove introduced rainbow trout and prevent hybridization with westslope cutthroat trout. Montana Fish, Wildlife & Parks (MFWP) will operate a fish trap downstream of the barrier for 6-10 consecutive years to manually remove the rainbow trout and hybrid spawners from the population. Removal of rainbow trout and hybrids from the stream will eradicate the existing hybrid population spawning in Abbot Creek and ultimately reduce the threat of hybridization in the Flathead River system. Pending completion of a successful disease screening and

244

EIS-0238-SA-05: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Supplement Analysis 5: Supplement Analysis EIS-0238-SA-05: Supplement Analysis Continued Operation of Los Alamos National Laboratory: Proposed Horizontal Expansion of the Restricted Airspace up to 5,000 feet at Los Alamos National Laboratory The DOE's National Nuclear Security Administration (NNSA) is not proposing to expand the horizontal dimensions of the existing 5,000-foot restricted airspace zone above LANL to include the southeast portion of TA-33 and the eastern portion of TA-54 in response to recent revised threat analyses. Operations at TA-33 and TA-54 would continue to be the same as those that are currently ongoing. Rather, security considerations have changed since the event of 9/11/01 and DOE has identified the need to expand LANL's 5,000-foot restriction to aircraft flights horizontally to include these

245

EIS-0246-SA-25: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Supplement Analysis 5: Supplement Analysis EIS-0246-SA-25: Supplement Analysis Wildlife Mitigation Program BPA proposes to fund a portion of the cost of a conservation easement on 56,400 acres of land along the Fisher River to preclude development and protect riparian habitat. The land is owned by the Plum Creek Timber Company, and Montana Fish, Wildlife & Parks (MFWP) will own and monitor the perpetual easement. The goal of the project is to protect approximately 142,000 acres owned by Plum Creek Timber Company: 56,400 in the Fisher River valley and 86,000 in the Thompson River valley. The total cost for the easement over 142,000 acres is estimated at around $30 million. BPA will contribute $500,000 toward the smaller parcel in the Fisher River valley, for each of fiscal years 2002, 2003, and 2004, for a total of $1.5

246

EIS-0285-SA-115: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Supplement Analysis 5: Supplement Analysis EIS-0285-SA-115: Supplement Analysis Transmission System Vegetation Management Program, Shelton-Fairmount # 1-4, Jefferson County, Washington Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 1.5 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated 35

247

EIS-0246-SA-38: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Supplement Analysis 8: Supplement Analysis EIS-0246-SA-38: Supplement Analysis Wildlife Mitigation Program, Flathead River System, Flathead County, Montana BPA proposes to purchase the conservation easements on the Sanders (307 acres) and Seabaugh (449 acres) parcels of the Weaver Slough to ensure that current fisheries and natural resource values remain protected, and that no development or human encroachment would occur on these parcels, in perpetuity. No planned construction or improvements are currently proposed and the project does not involve fee title land acquisition. Protection will sustain quality aquatic habitats, water quality, and fish and wildlife habitat. Wetlands protected by this easement are priority wetlands in the basin, according to the Flathead Lakers Critical Lands Study.

248

EIS-0246-SA-27: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

46-SA-27: Supplement Analysis 46-SA-27: Supplement Analysis EIS-0246-SA-27: Supplement Analysis Wildlife Mitigation Program, Kalispell, Flathead County, Montana BPA proposes to fund a fishery enhancement project where a fish passage barrier will be installed in Abbot Creek to remove introduced rainbow trout and prevent hybridization with westslope cutthroat trout. Montana Fish, Wildlife & Parks (MFWP) will operate a fish trap downstream of the barrier for 6-10 consecutive years to manually remove the rainbow trout and hybrid spawners from the population. Removal of rainbow trout and hybrids from the stream will eradicate the existing hybrid population spawning in Abbot Creek and ultimately reduce the threat of hybridization in the Flathead River system. Pending completion of a successful disease screening and

249

EIS-0285-SA-128: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

85-SA-128: Supplement Analysis 85-SA-128: Supplement Analysis EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program BPA proposes to remove unwanted vegetation along the right-ofway, access roads and around tower structures along the subject transmission line corridors. Approximately 5 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.5 mile of access road will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and

250

EIS-0285-SA-108: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Supplement Analysis 8: Supplement Analysis EIS-0285-SA-108: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5. BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 0.8 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites will be treated using selective and non-selective

251

Final Technical Report on Radioxenon Event Analysis  

SciTech Connect (OSTI)

This is a final deliverable report for the Advanced Spectral Analysis for Radioxenon project with a focus on radioxenon event categorization.

Ely, James H.; Cooper, Matthew W.; Hayes, James C.; Heimbigner, Tom R.; McIntyre, Justin I.; Schrom, Brian T.

2013-03-15T23:59:59.000Z

252

Western Regional Final Supplemental Environmental Impact Statement: Rulemaking for Small Power Production and Cogeneration Facilities - Exemptions for Geothermal Facilities  

SciTech Connect (OSTI)

Section 643 of the Energy Security Act of 1980 directed the Federal Energy Regulatory Commission to develop rules to further encourage geothermal development by Small Power Production Facilities. This rule amends rules previously established in Dockets No. RM79-54 and 55 under Section 201 and 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA). The analysis shows that the rules are expected to stimulate the development of up to 1,200 MW of capacity for electrical generation from geothermal facilities by 1995--1,110 MW more than predicted in the original PURPA EIS. This Final Supplemental EIS to the DEIS, issued by FERC in June 1980, forecasts likely near term development and analyzes environmental effects anticipated to occur due to development of geothermal resources in the Western United States as a result of this additional rulemaking.

Heinemann, Jack M.; Nalder, Nan; Berger, Glen

1981-02-01T23:59:59.000Z

253

EIS-0285-SA-451: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Supplement Analysis for the Transmission System Vegetation Management Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-451 Carlton-Tillamook Transmission Line Corridor, PP&A-2068) BPA proposes to remove tall growing and noxious vegetation from the ROW, structure sites and access roads that can potentially interfere with the operation, maintenance, and reliability of the transmission line. All vegetation management activities will be performed in accordance with the BPA Master Agreement Statement of Work for Vegetation Control on Bonneville Power Administration Transmission Line Rights-of-Way and in accordance with the specific details identified in the vegetation management checklist and detail/prescription sheet. EIS-0285-SA-451-2011.pdf More Documents & Publications

254

Hotspot Gap Analysis Final 20070323  

Broader source: Energy.gov (indexed) [DOE]

HS-0003 HS-0003 Software Evaluation of Hotspot and DOE Safety Software Toolbox Recommendation U.S. Department of Energy Office of Health, Safety and Security 1000 Independence Avenue, S.W. Washington, DC 20585-2040 March, 2007 ii Foreword This report documents the outcome of an evaluation of the Safety Software Quality Assurance (SSQA) attributes of Hotspot, a health physics application, relative to the safety software requirements identified in DOE O 414.1C, Quality Assurance. This evaluation, a "gap analysis", is performed according to the implementation guide DOE G 414.1-4, and is a requisite for deciding whether Hotspot should be designated as a toolbox code for DOE's safety software Central Registry. Comments regarding this document should be addressed to:

255

Supplement Analysis for the Mid-Columbia Coho Reintroduction Feasibility Project EA - New Acclimation Sites  

Broader source: Energy.gov (indexed) [DOE]

November 18, 2002 November 18, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Mid-Columbia Coho Reintroduction Feasibility Project EA (DOE/EA-1282/SA-03) L. Hermeston - KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: New acclimation sites Project No: 1996-040-00 Location: Upper Wenatchee watershed, Chelan County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Description of the Proposed Action: BPA is funding ongoing studies, research, and artificial production of coho salmon in the Wenatchee and Methow river basins. BPA analyzed environmental impacts of these activities in the Mid-Columbia Coho Reintroduction Feasibility Project Final EA, completed in April 1999 (DOE/EA-1282). Supplemental Analyses (DOE/EA-

256

EIS-0048-S: Final Supplemental Environmental Impact Statement to FES-75-79  

Broader source: Energy.gov [DOE]

Bonneville Power Administration Proposed FY 1976 Program Facility Location, Okanogan Area Service, Douglas and Okanogan Counties, WA, Supplemental

257

ITP Glass: Industrial Glass Bandwidth Analysis Final Report,...  

Broader source: Energy.gov (indexed) [DOE]

Industrial Glass Bandwidth Analysis Final Report, August 2007 ITP Glass: Industrial Glass Bandwidth Analysis Final Report, August 2007 industrialbandwidth.pdf More Documents &...

258

Supplement analysis 2 of environmental impacts resulting from modifications in the West Valley Demonstration Project  

SciTech Connect (OSTI)

The West Valley Demonstration Project, located in western New York, has approximately 600,000 gallons of liquid high-level radioactive waste (HLW) in storage in underground tanks. While corrosion analysis has revealed that only limited tank degradation has taken place, the failure of these tanks could release HLW to the environment. Congress requires DOE to demonstrate the technology for removal and solidification of HLW. DOE issued the Final Environmental Impact Statement (FEIS) in 1982. The purpose of this second supplement analysis is to re-assess the 1982 Final Environmental Impact Statement's continued adequacy. This report provides the necessary and appropriate data for DOE to determine whether the environmental impacts presented by the ongoing refinements in the design, process, and operations of the Project are considered sufficiently bounded within the envelope of impacts presented in the FEIS and supporting documentation.

NONE

1998-06-23T23:59:59.000Z

259

Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01)  

Broader source: Energy.gov (indexed) [DOE]

December 18, 2003 December 18, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program EA (DOE/EA-1173/SA-01) Ken Kirkman - KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Monitoring and Evaluation of Supplemented Spring Chinook Salmon and Life Histories of Wild Summer Steelhead in the Grande Ronde Basin Project No: 1998-007-03 Location: Union County, Oregon Proposed by: Bonneville Power Administration (BPA), Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW). Description of the Proposed Action: The CTUIR and ODFW propose to expand their monitoring and evaluation for the Grande Ronde spring chinook supplementation program to

260

DOE/EA-1440-S-1: Final Supplement to the Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's South Table Mountain Complex (May 2008)  

Broader source: Energy.gov (indexed) [DOE]

SUPPLEMENT TO FINAL SITE-WIDE ENVIRONMENTAL SUPPLEMENT TO FINAL SITE-WIDE ENVIRONMENTAL ASSESSMENT OF THE NATIONAL RENEWABLE ENERGY LABORATORY'S SOUTH TABLE MOUNTAIN COMPLEX Proposed Construction and Operation of: - Research Support Facilities, - Infrastructure Improvements (Phase I), - Upgrades to the Thermochemical User Facility and Addition of the Thermochemical Biorefinery Pilot Plant May 2008 U . S . D e p a r t m e n t o f E n e r g y G o l d e n F i e l d O f f i c e N a t i o n a l R e n e w a b l e E n e r g y L a b o r a t o r y 1 6 1 7 C o l e B o u l e v a r d G o l d e n , C o l o r a d o 8 0 4 0 1 DOE/EA-1440-S-1 Department of Energy Golden Field Office 161 7 Cole Boulevard Golden, Colorado 80401 -3305 May 14,2008 FINDING OF NO SIGNIFICANT IMPACT for SUPPLEMENT TO FINAL SITE-WIDE ENVIRONMENTAL ASSESSMENT OF THE NATIONAL RENEWABLE ENERGY LABORATORY'S

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

(DOE/EIS-0285/SA-5): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

March 30, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOEEIS-0285SA-5) - Big Eddy-Ostrander...

262

EIS-0285-SA-452: Supplement Analysis | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Supplement Analysis for the Transmission System Vegetation Management Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-452 Ross-St. Johns No. 1) PP&A Project #2108 BPA proposes to clear unwanted vegetation along and adjacent to the transmission line corridor and access roads of the 230-kV Ross-St. Johns No. 1 transmission line corridor from Ross Substation to St. Johns Substation. Other lines that are present within the corridor are the 230-kV Ross-Rivergate No. 1; the 230-kV Ross-Alcoa No. 3; the 115-kV Ross-Alcoa No. 1, No. 2, and No. 4; and the 115-kV Ross-Carborundum No. 1 line. The ROW corridor in the proposed project area measures from 125 to 295 feet in width and crosses approximately nine miles of terrain through fee-owned, urban residential, rural residential, industrial, agricultural, and private

263

CFAST Computer Code Application Guidance for Documented Safety Analysis, Final Report  

Broader source: Energy.gov (indexed) [DOE]

Final CFAST Code Guidance Final CFAST Code Guidance CFAST Computer Code Application Guidance for Documented Safety Analysis Final Report U.S. Department of Energy Office of Environment, Safety and Health 1000 Independence Ave., S.W. Washington, DC 20585-2040 July 2004 DOE/NNSA-DP Technical Report CFAST Computer Code Application Guidance Final Report July 2004 ii INTENTIONALLY BLANK. DOE/NNSA-DP Technical Report CFAST Computer Code Application Guidance Final Report July 2004 iii FOREWORD This document provides guidance to Department of Energy (DOE) facility analysts in the use of the CFAST computer software for supporting Documented Safety Analysis applications. Information is provided herein that supplements information found in the CFAST documentation

264

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » NEPA Documents » Supplement Analyses (SA) Services » NEPA Documents » Supplement Analyses (SA) Supplement Analyses (SA) A document that DOE prepares in accordance with DOE NEPA regulations (10 CFR 1021.314(c)) to determine whether a supplemental or new EIS should be prepared pursuant to CEQ NEPA regulations (40 CFR 1502.9(c). If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. Documents Available for Download October 10, 2013 EA-1812: Final Supplement Analysis Haxtun Wind Energy Project, Logan and Phillips Counties, CO September 10, 2013 EIS-0310-SA-02: Supplement Analysis Nuclear Infrastructure Programmatic Environmental Impact Statement Supplement Analysis Determination for Plutonium-238 Production for Radioisotope Power Systems June 14, 2013 EA-1562-SA-1: Supplement Analysis

265

EIS-0310-SA-02: Notice of Availability of Supplement Analysis and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Notice of Availability of Supplement Analysis and Notice of Availability of Supplement Analysis and Determination EIS-0310-SA-02: Notice of Availability of Supplement Analysis and Determination Nuclear Infrastructure Programmatic Environmental Impact Statement Supplement Analysis Determination for Plutonium-238 Production for Radioisotope Power Systems DOE has completed a Supplement Analysis (SA) of the Programmatic Environmental Impact Statement for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility (Nuclear Infrastructure or NI PEIS) (DOE/EIS-0310) published in December 2000. In accordance with DOE's NEPA Implementing Procedures at 10 CFR 1021.314, DOE has determined that the SA has not identified substantial changes to the

266

DOE/EIS-0197-SA-01; Delivery of the Canadian Entitlement Final Environmental Impact Statement Supplement to Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

Delivery of the Canadian Entitlement Delivery of the Canadian Entitlement Final Environmental Impact Statement Supplement to Record of Decision Summary The United States Entity has decided to supplement an earlier decision regarding the Canadian Entitlement. The United States Entity issued a Delivery of the Canadian Entitlement Record of Decision (ROD) on November 8, 1996. The ROD was based on the Delivery of the Canadian Entitlement Environmental Impact Statement (DOE/EIS- 0197, issued in January 1996). The November 1996 ROD announced the United States Entity decision to fulfill its obligation under the Columbia River Treaty (Treaty) between Canada and the United States of America (United States) by delivering the full Canadian Entitlement (Entitlement) at existing transmission interconnections between the United

267

EIS-0285-SA-65: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management along the Raymond - Cosmopolis Transmission Line would include danger tree removal within some areas adjacent to the right-of-way (ROW) (May 2002) Supplement...

268

Final Report - Hydrogen Delivery Infrastructure Options Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Power of Experience The Power of Experience Final Report Hydrogen Delivery Infrastructure Options Analysis DOE Award Number: DE-FG36-05GO15032 Project director/principal investigator: Tan-Ping Chen Consortium/teaming Partners: Air Liquide, Chevron Technology Venture, Gas Technology Institute, NREL, Tiax, ANL Hydrogen Delivery Infrastructure Options Analysis ii TABLE OF CONTENTS SECTION 1 EXECUTIVE SUMMARY ........................................................................... 1-1 1.1 HOW THE RESEARCH ADDS TO THE UNDERSTANDING OF THE AREA INVESTIGATED. 1-1 1.2 TECHNICAL EFFECTIVENESS AND ECONOMIC FEASIBILITY OF THE METHODS OR TECHNIQUES INVESTIGATED OR DEMONSTRATED .................................................... 1-1 1.3 HOW THE PROJECT IS OF BENEFIT TO THE PUBLIC..................................................... 1-1

269

DOE Hydrogen Transition Analysis Workshop: Final Agenda | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Agenda DOE Hydrogen Transition Analysis Workshop: Final Agenda Agenda for the DOE Hydrogen Transition Analysis Workshop on January 26, 2006. transitionwkshpagenda.pdf More...

270

FINAL ENVIRONMENTAL ASSESSMENT / FINAL REGULATORY IMPACT REVIEW / INITIAL REGULATORY FLEXIBILITY ANALYSIS  

E-Print Network [OSTI]

FINAL ENVIRONMENTAL ASSESSMENT / FINAL REGULATORY IMPACT REVIEW / INITIAL REGULATORY FLEXIBILITY ..............................................................................................16 2 REGULATORY IMPACT REVIEW ANALYSIS for Amendment 83 to the Fishery Management Plan for Groundfish of the Gulf of Alaska ALLOCATION

271

EIS-0236-S4: Final Complex Transformation Supplemental Programmatic Environmental Impact Statement  

Broader source: Energy.gov [DOE]

This Complex Transformation Supplemental Programmatic Environmental Impact Statement (SPEIS) analyzes the potential environmental impacts of reasonable alternatives to continue transformation of the nuclear weapons complex to be smaller, and more responsive, efficient, and secure in order to meet national security requirements.

272

Microsoft Word - SUPPLEMENT 1 TO ATTACHMENT A102609Final.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1, Rev C 1 of 6 Approved 10/27/09 1, Rev C 1 of 6 Approved 10/27/09 SUPPLEMENT 1 TO ATTACHMENT A WORK BY CONTRACTORS ON THE BROOKHAVEN NATIONAL LABORATORY SITE - SUPPLEMENTAL CONDITIONS Article 1 Identification of Employees (a) The Contractor agrees, pursuant to Executive Order 12989, to use an electronic employment Eligibility Verification (E-Verify) system designated by the Secretary of Homeland Security to verify the eligibility of: (i) all persons hired during the contract term by the Contractor to perform duties within the United States; and (ii) all persons assigned by the Contractor to perform work within the United States on the Federal Contract. The Contractor agrees to incorporate the substance of this clause in all subcontracts under this contract. (b) All contractor and subcontractor employees who will perform work on the Brookhaven National

273

Microsoft Word - STEO supplement non-OPEC supply Final-2.doc  

Gasoline and Diesel Fuel Update (EIA)

08 08 1 February 2008 Short-Term Energy Outlook Supplement: Outlook for Non-OPEC Oil Supply Growth in 2008- 2009 1 Most oil market analysts, including EIA, have pointed to the slow growth in oil supply from countries that are not members of the Organization of the Petroleum Exporting Countries (OPEC) in recent years as a key cause of the current high oil price environment. The widening gap between growth in world oil consumption and non- OPEC oil supply has led to greater reliance upon production by OPEC and a drawdown in the Organization for Economic Cooperation and Development (OECD) commercial inventories. These conditions have contributed to upward pressure on world oil prices in recent years (see Why Are Oil Prices So High?, supplement to the November 2007 Short-

274

BIGHORN SHEEP: SUPPLEMENTAL ANALYSIS TO THE FOREST PLAN ENVIRONMENTAL...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- Tied to secondary and supplemental waste treatment Updated 010513 Page 2 of 2 * TC & WM EIS Update (joint w RAP) - presentation on WMACPA, STOMP, Mod-flow, GW modeling (joint...

275

EIS-0285-SA-138: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Vegetation Management for portion of the Raver - Echo Lake 1 500 kV transmission line located from tower structure 41 to 131 (0285-SA-138) (April 2003) Supplement...

276

EIS-0265-SA-79: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

relocate 4,500 feet of existing dike along the Grande Ronde River, re-create native wetlands, relocate an existing powerline, and establish a riparian forest buffer. Supplement...

277

Software Quality Assurance Improvment Plan: ALOHA Gap Analysis, Final Report  

Broader source: Energy.gov (indexed) [DOE]

Final-ALOHA Final-ALOHA Defense Nuclear Facilities Safety Board Recommendation 2002-1 Software Quality Assurance Improvement Plan Commitment 4.2.1.3: Software Quality Assurance Improvement Plan: ALOHA Gap Analysis Final Report U.S. Department of Energy Office of Environment, Safety and Health 1000 Independence Ave., S.W. Washington, DC 20585-2040 May 2004 ALOHA Gap Analysis May 2004 Final Report INTENTIONALLY BLANK ii ALOHA Gap Analysis May 2004 Final Report FOREWORD This report documents the outcome of an evaluation of the Software Quality Assurance (SQA) attributes of the chemical source term and atmospheric dispersion computer code, ALOHA 5.2.3, relative to established

278

EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis |  

Broader source: Energy.gov (indexed) [DOE]

60: DOE Notice of Availability of the Draft Supplement 60: DOE Notice of Availability of the Draft Supplement Analysis EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride, Clive, Utah The draft SA addresses DOE's proposal to dispose of the depleted uranium oxide conversion product at either the DOE-owned low- level radioactive waste disposal facility at the Nevada Test Site (NTS) or at EnergySolutions LLC, a commercial low-level waste disposal facility in Clive, Utah (EnergySolutions; formerly known as Envirocare of Utah, Inc.). DOE/EIS-0360, Department of Energy, Notice of Availability of a Draft Supplement Analysis for Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride,

279

EIS-0359: DOE Notice of Availability of the Draft Supplement Analysis |  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Supplement DOE Notice of Availability of the Draft Supplement Analysis EIS-0359: DOE Notice of Availability of the Draft Supplement Analysis Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride The draft SA addresses DOE's proposal to dispose of the depleted uranium oxide conversion product at either the DOE-owned low-level radioactive waste disposal facility at the Nevada Test Site (NTS) or at EnergySolutions LLC, a commercial low-level waste disposal facility in Clive, Utah (EnergySolutions; formerly known as Envirocare of Utah, Inc.). DOE/EIS-0359, Department of Energy, Notice of Availability of a Draft Supplement Analysis for Disposal of Depleted Uranium Oxide Conversion Produce Generated from DOE's Inventory of Depleted Uranium Hexafluoride, 72

280

EA-1120: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Golden, Colorado. EA-1120-FEA-1996.pdf More Documents & Publications EIS-0277: Final Environmental Impact Statement EIS-0026-SA-03: Supplement Analysis EIS-0277: Record of Decision...

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Helicopter final assembly critical path analysis  

E-Print Network [OSTI]

Helicopter final assembly involves the installation of hundreds of components into the aircraft and takes thousands of man-hours. Meeting production targets such as total build days and total aircraft man-hours can be ...

Daigh, Sara L. (Sarah Louise), 1981-

2012-01-01T23:59:59.000Z

282

The conservation planning analysis model. Final report  

SciTech Connect (OSTI)

This paper contains the source code for a program on conservation planning analysis for residential, commercial and industrial customers.

Not Available

1993-12-31T23:59:59.000Z

283

Final Report- Hydrogen Delivery Infrastructure Options Analysis  

Broader source: Energy.gov [DOE]

This report provides in-depth analysis of various hydrogen delivery options to determine the most cost effective infrastructure and R&D efforts for the long term.

284

Software Quality Assurance Improvment Plan: CFAST Gap Analysis, Final Report  

Broader source: Energy.gov (indexed) [DOE]

EH-4.2.1.3-CFAST-Gap Analysis EH-4.2.1.3-CFAST-Gap Analysis Defense Nuclear Facilities Safety Board Recommendation 2002-1 Software Quality Assurance Improvement Plan Commitment 4.2.1.3: Software Quality Assurance Improvement Plan: CFAST Gap Analysis Final Report U.S. Department of Energy Office of Environment, Safety and Health 1000 Independence Ave., S.W. Washington, DC 20585-2040 May 2004 CFAST Gap Analysis May 2004 Final Report ii INTENTIONALLY BLANK CFAST Gap Analysis May 2004 Final Report iii FOREWORD This report documents the outcome of an evaluation of the Software Quality Assurance (SQA) attributes of the CFAST computer code for accident analysis applications, relative to established requirements. This evaluation, a "gap analysis," is performed to meet commitment 4.2.1.3 of the Department of Energy's

285

Supplement analysis for continued operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore. Volume 2: Comment response document  

SciTech Connect (OSTI)

The US Department of Energy (DOE), prepared a draft Supplement Analysis (SA) for Continued Operation of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL-L), in accordance with DOE`s requirements for implementation of the National Environmental Policy Act of 1969 (NEPA) (10 Code of Federal Regulations [CFR] Part 1021.314). It considers whether the Final Environmental Impact Statement and Environmental Impact Report for Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore (1992 EIS/EIR) should be supplement3ed, whether a new environmental impact statement (EIS) should be prepared, or no further NEPA documentation is required. The SA examines the current project and program plans and proposals for LLNL and SNL-L, operations to identify new or modified projects or operations or new information for the period from 1998 to 2002 that was not considered in the 1992 EIS/EIR. When such changes, modifications, and information are identified, they are examined to determine whether they could be considered substantial or significant in reference to the 1992 proposed action and the 1993 Record of Decision (ROD). DOE released the draft SA to the public to obtain stakeholder comments and to consider those comments in the preparation of the final SA. DOE distributed copies of the draft SA to those who were known to have an interest in LLNL or SNL-L activities in addition to those who requested a copy. In response to comments received, DOE prepared this Comment Response Document.

NONE

1999-03-01T23:59:59.000Z

286

ENVIRONMENTAL ASSESSMENT / REGULATORY IMPACT REVIEW / FINAL REGULATORY FLEXIBILITY ANALYSIS  

E-Print Network [OSTI]

ENVIRONMENTAL ASSESSMENT / REGULATORY IMPACT REVIEW / FINAL REGULATORY FLEXIBILITY ANALYSIS for Modifying existing Chinook and chum salmon savings areas AMENDMENT 84 to the Fishery Management Plan by the current regulatory closure regulations, as much higher salmon bycatch rates are reportedly encountered

287

(DOE/EIS-0285/SA-08): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/23/01  

Broader source: Energy.gov (indexed) [DOE]

23, 2001 23, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08 Don Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Clearing C-trees along the south side of the right-of-way. Location: Raver - Covington Line 1, between towers 6/5 and 7/2. Work will be performed in the State of Washington. Proposed by: BPA Snohomish Region. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). Planning Steps 1. Identify facility and the vegetation management need. The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All

288

ALTERNATIVE JET FUEL SCENARIO ANALYSIS Final Report  

E-Print Network [OSTI]

and considers existing and emerging fuel production technologies. The analysis also forecasts how alternative fuels might contribute to greenhouse gas goals. Based on a review of fuel production companies' stated of the most optimistic demand forecasts and the "product switch" production scenarios leads to North American

289

Final report on the Pathway Analysis Task  

SciTech Connect (OSTI)

The Pathway Analysis Task constituted one of several multi-laboratory efforts to estimate radiation doses to people, considering all important pathways of exposure, from the testing of nuclear devices at the Nevada Test Site (NTS). The primary goal of the Pathway Analysis Task was to predict radionuclide ingestion by residents of Utah, Nevada, and portions of seven other adjoining western states following radioactive fallout deposition from individual events at the NTS. This report provides comprehensive documentation of the activities and accomplishments of Colorado State University`s Pathway Analysis Task during the entire period of support (1979--91). The history of the project will be summarized, indicating the principal dates and milestones, personnel involved, subcontractors, and budget information. Accomplishments, both primary and auxiliary, will be summarized with general results rather than technical details being emphasized. This will also serve as a guide to the reports and open literature publications produced, where the methodological details and specific results are documented. Selected examples of results on internal dose estimates are provided in this report because the data have not been published elsewhere.

Whicker, F.W.; Kirchner, T.B. [Colorado State Univ., Fort Collins, CO (United States)

1993-04-01T23:59:59.000Z

290

Rankine bottoming cycle safety analysis. Final report  

SciTech Connect (OSTI)

Vector Engineering Inc. conducted a safety and hazards analysis of three Rankine Bottoming Cycle Systems in public utility applications: a Thermo Electron system using Fluorinal-85 (a mixture of 85 mole % trifluoroethanol and 15 mole % water) as the working fluid; a Sundstrand system using toluene as the working fluid; and a Mechanical Technology system using steam and Freon-II as the working fluids. The properties of the working fluids considered are flammability, toxicity, and degradation, and the risks to both plant workers and the community at large are analyzed.

Lewandowski, G.A.

1980-02-01T23:59:59.000Z

291

Regulatory analysis technical evaluation handbook. Final report  

SciTech Connect (OSTI)

The purpose of this Handbook is to provide guidance to the regulatory analyst to promote preparation of quality regulatory analysis documents and to implement the policies of the Regulatory Analysis Guidelines of the US Nuclear Regulatory Commission (NUREG/BR-0058 Rev. 2). This Handbook expands upon policy concepts included in the NRC Guidelines and translates the six steps in preparing regulatory analyses into implementable methodologies for the analyst. It provides standardized methods of preparation and presentation of regulatory analyses, with the inclusion of input that will satisfy all backfit requirements and requirements of NRC`s Committee to Review Generic Requirements. Information on the objectives of the safety goal evaluation process and potential data sources for preparing a safety goal evaluation is also included. Consistent application of the methods provided here will result in more directly comparable analyses, thus aiding decision-makers in evaluating and comparing various regulatory actions. The handbook is being issued in loose-leaf format to facilitate revisions. NRC intends to periodically revise the handbook as new and improved guidance, data, and methods become available.

NONE

1997-01-01T23:59:59.000Z

292

EIS-0225-SA-05: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components, Texas This SA will enable DOE's NNSA to determine whether the existing...

293

EIS-0285-SA-63: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis Transmission System Vegetation Management Program, North Bonneville-Midway and Hanvor-Ostrander Vegetation Management on the North Bonneville-Midway and...

294

EIS-0285-SA-87: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis Transmission System Vegetation Management Program Cowlitz Tap-Olympia White River Protect and Restore the Asotin Creek Watershed - Upper Charley Subwatershed...

295

EIS-0285-SA-91: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis Transmission System Vegetation Management Program Cowlitz Tap-Olympia White River Protect and Restore the Asotin Creek Watershed - Upper Charley Subwatershed...

296

EIS-0285-SA-58: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis Transmission System Vegetation Management Program Vegetation Management at the Lines Creek Microwave site. The proposed work will be accomplished within the fenced area of...

297

DOE/EIS-0222-SA-O1 Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

22-SA-O1 22-SA-O1 Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact Statement U.S. Department of Energy Richland Operations Office Richland, Washington 99352 June 2008 DOE/EIS-0222-SA-0 1 SUMMARY In September 1999 the U.S. Department of Energy (DOE) issued the Final Hanford Comprehensive Land-Use Plan (HCP) Environmental Impact Statement (EIS) (DOE/EIS-0222-F). The HCP EIS analyzed the impacts of alternatives for implementing a land-use plan for the DOE's Hanford Site for at least the next 50-year planning period and lasting for as long as DOE retains legal control of some portion of the real estate. In November 1999 DOE issued its Record of Decision (ROD), establishing the Comprehensive Land-Use Plan (CLUP), which consisted of four key elements:

298

Supplement Analysis for Yakima/Klickitat Fisheries Project, Boone Pond Acclimation Site (DOE/EIS-0169-SA-08)  

Broader source: Energy.gov (indexed) [DOE]

April 7, 2004 April 7, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for Yakima/Klickitat Fisheries Project, Boone Pond Acclimation Site (DOE/EIS-0169-SA-08) memorandum David Byrnes Project Manager - KEWL-4 TO: Proposed Action: Yakima/Klickitat Fisheries Project - Under the Monitoring and Evaluation Program (M&E), the coho acclimation research task would be modified to include a new site located in the upper Yakima south of Cle Elum, WA. Project No.: F3204 Location: Cle Elum, Kittitas County, Washington. Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Yakima Fisheries Project Final Environmental Impact Statement (YFP EIS)

299

SUPPLEMENT ANALYSIS OF TRANSURANIC WASTE CHARACTERIZATION AND REPACKAGING A  

Broader source: Energy.gov (indexed) [DOE]

TRANSURANIC WASTE CHARACTERIZATION AND REPACKAGING A TRANSURANIC WASTE CHARACTERIZATION AND REPACKAGING A C T I V I T I E S AT THE IDAHO NATIONAL ENGINEERING LABORATORY I N SUPPORT OF THE WASTE ISOLATION PILOT PLANT TEST PROGRAM P r e p a r e d by U.S. D e p a r t m e n t o f E n e r g y O f f i c e o f E n v i r o n m e n t a l R e s t o r a t i o n a n d W a s t e Management M a r c h 1 9 9 1 FOREWORD T h i s supplement a n a l y s i s has been prepared t o d e s c r i b e new i n f o r m a t i o n r e l e v a n t t o waste r e t r i e v a l , handling, and c h a r a c t e r i z a t i o n a t t h e Idaho N a t i o n a l E n g i n e e r i n g L a b o r a t o r y (INEL) and t o e v a l u a t e t h e need f o r a d d i t i o n a l documentation t o s a t i s f y t h e N a t i o n a l Environmental Pol i c y A c t (NEPA) - - 4 0 Code o f Federal R e g u l a t i o n s (CFR) 1502.9--and S e c t i o n C, P a r t 2, o f t h e U.S. Department o f Energy (DOE) NEPA G u i d e l i n e s (52 Federal R e g i s t e r [FR] 47662, Dece~iiber 15, 1987).

300

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-33)  

Broader source: Energy.gov (indexed) [DOE]

1, 2003 1, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-33) Ron Morinaka Fish and Wildlife Project Manager, KEWU-4 Proposed Action: Gooderich Bayou Culvert Replacement (Hungry Horse Fisheries Mitigation Program) Project No: 1991-019-03 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 8.2 Control of Predators and Nuisance Animals - Removal or Reduction of Undesirable Wildlife Species. Location: Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Montana Fish, Wildlife, and Parks (MFWP) Description of the Proposed Action: BPA is proposing to fund a fish barrier project with Montana Fish,

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EIS (DOE/EIS-0246/SA-17) Supplement Analysis for the Wildlife Management Program EIS  

Broader source: Energy.gov (indexed) [DOE]

September 13, 2001 September 13, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-17) Joe HeHerrera - KEWU Fish and Wildlife Project Manager Proposed Action: Eagle Lakes Ranch Acquisition and Restoration Project No: 2000-025-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques - 1.1 Fee-Title Acquisition Location: Franklin County, Washington Proposed by: Bonneville Power Administration (BPA) and the U.S. Fish and Wildlife Service (USFWS), Columbia National Wildlife Refuge Description of the Proposed Action: BPA proposes to partially fund the acquisition of 7,630 acres

302

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-37)  

Broader source: Energy.gov (indexed) [DOE]

January 16, 2004 January 16, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-37) Charlie Craig - KEWU-4 Fish and Wildlife Project Manager Proposed Action: Blue Creek Winter Range - Spokane Reservation (Acquisition of Sampson, Lantzy, Allotment #0065-C, and Allotment 154 Properties) Project No: 1991-062-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.1 Fee Title Acquisition and Transfer Location: On the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington Proposed by: Bonneville Power Administration (BPA) and the Spokane Tribe of Indians Description of the Proposed Action: BPA proposes to fund the purchase of four parcels of land

303

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-35)  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-35) Joe Deherrera Fish and Wildlife Project Manager Proposed Action: Malheur Wildlife Mitigation Project- Denny Jones Ranch Project No: 200002700 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.0 Plant Propagation Techniques; 4.0 Water Development and Management; 5.0 Water Distribution Techniques; 6.0 Fire Management Techniques (prompt fire suppression and fuels management, natural fire management), 7.0 Vegetation Management (herbicide, hand pulling, prescribed burns, water level manipulation); 8.2 Control of Predators and

304

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-25)  

Broader source: Energy.gov (indexed) [DOE]

June 11, 2002 June 11, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-25) Ron Morinaka, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Purchase of Fisher River Conservation Easement (Fiscal Years 2002-2004) Project No: 2002-044-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.2 Easement Acquisition Location: near Libby, Lincoln County, Montana Proposed by: Bonneville Power Administration (BPA) and Montana Fish, Wildlife & Parks Description of the Proposed Action: BPA proposes to fund a portion of the cost of a conservation easement on 56,400 acres of land along the Fisher River to preclude development

305

Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-38)  

Broader source: Energy.gov (indexed) [DOE]

14, 2004 14, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Management Program EIS (DOE/EIS-0246/SA-38) Joe DeHerrera Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Proposed Weaver Slough Conservation Easement Project No: 2002-042 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS [page A/2]): 1.2 Easement Acquisition Location: Flathead River System, Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Flathead Land Trust Description of the Proposed Action: BPA proposes to purchase the conservation easements on the Sanders (307 acres) and Seabaugh (449 acres) parcels of the Weaver Slough to ensure that

306

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-91)  

Broader source: Energy.gov (indexed) [DOE]

, 2002 , 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-91) Tom Morse, KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: Hood River Fish Habitat (Evans Creek Culvert Replacement) Project No: 1998-021-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.13 Culvert removal/replacement to improve fish passage, 2.1 Maintain healthy riparian plant communities, 2.4 Provide filter strips to catch sediment and other pollutants, 2.6 Native seeds inventory, 2.7 Avoid exotic species, 7.2 Install hydraulic structures at low streamflows, 7.3 Minimize erosion

307

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-57)  

Broader source: Energy.gov (indexed) [DOE]

July 12, 2001 July 12, 2001 REPLY TO ATTN OF: KECN-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-57) Allyn Meuleman - KEWU Fish and Wildlife Project Manager Proposed Action: Idaho Fish Screening Improvement (Champion, Iron, Fourth of July, Goat Creeks) Project No: 1994-015-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish passage enhancement - fishways; 4.25 Consolidate/Replace irrigation diversion dams; 4.10 Water Conveyance: pipeline. Location: Stanley, Custer County, Idaho. Proposed by: Bonneville Power Administration (BPA) and the Idaho Department of Fish and Game. Description of the Proposed Action: BPA proposes to fund a project that will enhance in-stream

308

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-83)  

Broader source: Energy.gov (indexed) [DOE]

19, 2002 19, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-83) John Baugher Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Bear Creek Irrigation Siphon Project Project No: 1993-066-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.8 Bank Protection; 1.9 Structural Bank Protection using Bio Engineering Techniques; 1.10 Structural Bank Protection using Engineering Structures; 1.14 Reduce Scour and Deposition at Hydraulic Structures; 1.15 Fish Passage Enhancement-Fishways; 1.16 Spawning Habitat Enhancements; 1.17 Rearing Habitat Enhancements; 2.1 Maintain Healthy Riparian Plant Communities; 2.4 Provide Filter Strips to

309

EIS (DOE/EIS-0246-SA-24) Supplement Analysis for the Wildlife MitigationProgram EIS  

Broader source: Energy.gov (indexed) [DOE]

3, 2002 3, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-24) David Sill Fish and Wildlife Project Manager Proposed Action: Herbert Conservation Easement Project No: 1992-068-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.2 Easement Acquisition Location: Benton County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Oregon Department of Fish and Wildlife (ODFW) Description of the Proposed Action: BPA proposes to purchase a conservation easement on approximately 221 acres of the Herbert parcel in Benton County, Oregon for the protection of wetland, riparian, and riverine habitats. The Herbert parcel is located within the Willamette

310

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-36)  

Broader source: Energy.gov (indexed) [DOE]

October 10, 2003 October 10, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-36) Joe DeHerrera- KEWN-4 Fish and Wildlife Project Manager Proposed Action: Logan Valley Wildlife Mitigation Project-Implemetation of Wildlife Mitigation Plan Project No: 200000900 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.0 Plant Propagation Techniques; 4.0 Water Development and Management; 5.0 Water Distribution Techniques; 6.0 Fire Management Techniques (prompt fire suppression and fuels management, natural fire management), 7.0 Vegetation Management (herbicide, hand pulling, prescribed burns, water level manipulation); 8.0 Species Manangement

311

ENVIRONMENTAL ASSESSMENT/REGULATORY IMPACT REVIEW/ FINAL REGULATORY FLEXIBILITY ANALYSIS  

E-Print Network [OSTI]

ENVIRONMENTAL ASSESSMENT/REGULATORY IMPACT REVIEW/ FINAL REGULATORY FLEXIBILITY ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . 15 3.0 REGULATORY IMPACT REVIEW: ECONOMIC AND SOCIOECONOMIC IMPACTS OF THE ALTERNATIVES FOR AMENDMENT 47 TO THE FISHERY MANAGEMENT PLAN FOR THE GROUNDFISH FISHERY OF THE BERING SEA AND ALEUTIAN

312

ENVIRONMENTAL ASSESSMENT / REGULATORY IMPACT REVIEW / FINAL REGULATORY FLEXIBILITY ANALYSIS  

E-Print Network [OSTI]

ENVIRONMENTAL ASSESSMENT / REGULATORY IMPACT REVIEW / FINAL REGULATORY FLEXIBILITY ANALYSIS Management Plan for Groundfish of the Bering Sea and Aleutian Islands Management Area October 2007 Prepared that bycatch may be exacerbated by the current regulatory closure regulations, as much higher salmon bycatch

313

2010-2025 Scenario Analysis for Hydrogen Fuel Cell Vehicles and Infrastructure Final List of Attendees  

Broader source: Energy.gov [DOE]

2010-2025 Scenario Analysis for Hydrogen Fuel Cell Vehicles and Infrastructure Final List of Attendees

314

West Valley Demonstration Project Waste Management Environmental Impact Statement Supplement Analysis (DOE/EIS-0337-SA-01) (06/07/06)  

Broader source: Energy.gov (indexed) [DOE]

3 3 7-SA-O1 West Valley Demonstration Project Waste Management Environmental Impact Statement Supplement Analysis Revised Final U.S. Department of Energy West Valley Demonstration Project West Valley, New York June 7, 2006 WVDP Waste Management US - Supplement Analysis Table of Contents 1.0 PURPOSE AND NEED FOR AGENCY ACTION 1 2.0 PROPOSED ACTIONS 1 3.0 WASTE TYPE DEFINITIONS 2 4.0 EXISTING NEPA ANALYSIS 3 5.0 NEW INFORMATION 3 6.0 IS A SUPPLEMENTAL EIS NEEDED~ 5 6.1 Glass Melter, CFMT, and MFHT 5 6.2 Increased LLW Volumes 11 7.0 CONCLUSION 17 8.0 DETERMINATION 177 9.0 REFERENCES 17 List of Tables Table 1. Radiation Doses for Involved and Noninvolved Workers Under Alternative A, Including the Glass Melter, CFMT, and MFHT 8 Table 2. Radiological Consequences of Accidents Using 50-Percent Atmospheric Conditions ...9 Table 3. Radiological Consequences of Accidents Using 95-Percent

315

Enforcement Guidance Supplement 05-01, Contractor Investigation, Causal Analysis, and Corrective Actions  

Broader source: Energy.gov (indexed) [DOE]

23, 2005 23, 2005 MEMORANDUM FOR: DOE AND CONTRACTOR PRICE-ANDERSON AMENDMENTS ACT COORDINATORS FROM: STEPHEN M. SOHINKI DIRECTOR OFFICE OF PRICE-ANDERSON ENFORCEMENT SUBJECT: Enforcement Guidance Supplement 05-01: Contractor Investigation, Causal Analysis, and Corrective Actions Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. Such guidance is typically issued in the form of an Enforcement Guidance Supplement (EGS). As part of the investigation of potential nuclear safety noncompliances, OE routinely reviews the contractor's investigation of the noncompliance, the associated causal

316

National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement  

SciTech Connect (OSTI)

This Supplemental Environmental Impact Statement (SEIS) was prepared pursuant to a Joint Stipulation and Order approved and entered as an order of the court on October 27, 1997, in partial settlement of the lawsuit Civ. No. 97-936 (SS) (D.D.C.), ''Natural Resources Defense Council [NRDC] et al. v. Richardson et al.'' The Joint Stipulation and Order is reproduced at the end of this document as Attachment 1. In the Joint Stipulation and Order, the U.S. Department of Energy (DOE) agreed to prepare an SEIS to the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (SSM PEIS) (DOE/EIS-0236, DOE 1996a) to evaluate the reasonably foreseeable significant adverse environmental impacts of continuing to construct and of operating the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) in Livermore, California, with respect to any potential or confirmed contamination in the area by hazardous, toxic, and/or radioactive materials. On September 25, 1998, DOE announced in the ''Federal Register'' the agency's intent to prepare this SEIS for the NIF portion (Volume III, Appendix I) of the SSM PEIS. DOE's need for preparation of this SEIS, consistent with the previously established need for NIF (DOE 1996a, Appendix I), is to determine how the results of characterization studies completed pursuant to the Joint Stipulation and Order should affect the manner in which DOE proceeds with the construction and operation of NIF. On August 5, 1999, DOE issued an amended Notice of Intent to prepare this SEIS, which incorporated changes in schedule resulting from new relevant information. The SSM PEIS addressed alternative plans for DOE's defense program activities related to nuclear weapons stockpile issues at several DOE laboratories, including LLNL. The environmental consequences of construction and operation of NIF were addressed in detail in SSM PEIS Volume III, Appendix I, entitled ''National Ignition Facility Project Specific Analysis'' (NIF PSA). The Record of Decision (ROD) for the SSM PEIS was published in the ''Federal Register'' on December 26, 1996 (61 FR 68014). In the ROD, DOE announced its decision to construct and operate NIF at LLNL. The NIF is an experimental facility that would use laser light to initiate a fusion reaction in very small quantities of hydrogen by a process known as inertial confinement fusion. The start of physical construction of NIF was authorized on March 7, 1997, and groundbreaking for the NIF occurred on May 29, 1997. Construction of the NIF is ongoing; the conventional facilities are over 94% complete and are expected to be completed in late 2001.

N /A

2001-02-23T23:59:59.000Z

317

EIS-0238-S1: Supplemental Environmental Impact Statement to the Final Site-Wide Environmental Impact Statement for Continued Operation of the Los Alamos National Laboratory, New Mexico  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE), Albuquerque Operations Office, has prepared a Supplemental Analysis (SA) to determine if the Site-Wide Environmental Impact Statement for Continued Operations of Los Alamos National Laboratory (SWEIS) adequately addresses the environmental effects of a proposal for modifying current methods utilized to receive and manage certain offsite unwanted radioactive sealed sources at Los Alamos National Laboratory or if additional documentation under the National Environmental Policy Act (NEPA) is needed.

318

Geographically Based Hydrogen Consumer Demand and Infrastructure Analysis: Final Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Geographically Based Hydrogen Geographically Based Hydrogen Consumer Demand and Infrastructure Analysis Final Report M. Melendez and A. Milbrandt Technical Report NREL/TP-540-40373 October 2006 NREL is operated by Midwest Research Institute ● Battelle Contract No. DE-AC36-99-GO10337 Geographically Based Hydrogen Consumer Demand and Infrastructure Analysis Final Report M. Melendez and A. Milbrandt Prepared under Task No. HF65.8310 Technical Report NREL/TP-540-40373 October 2006 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov Operated for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy by Midwest Research Institute * Battelle Contract No. DE-AC36-99-GO10337 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

319

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-09)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's McNary-Santiam No. 1 Transmission Line, beginning in the summer of 2000 and ending in July, 2001. This Supplemental Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

N /A

2001-05-01T23:59:59.000Z

320

DOE/EIS-0026-SA-06: Supplement Analysis for the Transportation of Transuranic Waste in TRUPACT-III Containers (9/25/07)  

Broader source: Energy.gov (indexed) [DOE]

6 6 Supplement Analysis for the Transportation of Transuranic Waste in TRUPACT-III Containers September 2007 U.S. Department of Energy Carlsbad Field Office Supplement Analysis for the Transportation of Transuranic Waste in TRUPACT-III Containers ii This page intentionally blank Supplement Analysis for the Transportation of Transuranic Waste in TRUPACT-III Containers iii TABLE OF CONTENTS Section Page 1.0 INTRODUCTION...........................................................................................................1 2.0 PURPOSE AND NEED FOR ACTION...........................................................................1 3.0 PROPOSED ACTION.....................................................................................................1

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Microsoft Word - IMBA Gap Analysis Final 20060831.doc  

Broader source: Energy.gov (indexed) [DOE]

DOE/EH-0711 DOE/EH-0711 Gap Analysis for IMBA and DOE Safety Software Central Registry Recommendation Final U.S. Department of Energy Office of Environment, Safety and Health 1000 Independence Avenue, S.W. Washington, D.C. 20585-2040 August 2006 DOE/EH-0711 i INTENTIONALLY BLANK DOE/EH-0711 ii FOREWORD This report documents the outcome of an evaluation of the safety software quality assurance attributes of the Integrated Modules for Bioassay Analysis (IMBA) Expert (tm) USDOE-Edition and Professional Plus computer products relative to the safety software requirements identified in DOE O 414.1C, Quality Assurance. This evaluation, a gap analysis, is performed according to DOE G 414.1-4 and is a requisite

322

Draft Supplement Analysis for Location(s) to Dispose of Depleted Uranium Oxide Conversion Product Generated from DOE'S Inventory of Depleted Uranium Hexafluoride  

Broader source: Energy.gov (indexed) [DOE]

DRAFT SUPPLEMENT ANALYSIS FOR LOCATION(S) TO DISPOSE OF DEPLETED DRAFT SUPPLEMENT ANALYSIS FOR LOCATION(S) TO DISPOSE OF DEPLETED URANIUM OXIDE CONVERSION PRODUCT GENERATED FROM DOE'S INVENTORY OF DEPLETED URANIUM HEXAFLUORIDE (DOE/EIS-0359-SA1 AND DOE/EIS-0360-SA1) March 2007 March 2007 i CONTENTS NOTATION........................................................................................................................... iv 1 INTRODUCTION AND BACKGROUND ................................................................. 1 1.1 Why DOE Has Prepared This Draft Supplement Analysis .............................. 1 1.2 Background ....................................................................................................... 3 1.3 Proposed Actions Considered in this Draft Supplement Analysis.................... 4

323

FINAL  

Broader source: Energy.gov (indexed) [DOE]

2 2 FINAL ENVIRONMENTAL ASSESSMENT FOR EXIDE TECHNOLOGIES ELECTRIC DRIVE VEHICLE BATTERY AND COMPONENT MANUFACTURING INITIATIVE APPLICATION, BRISTOL, TN, AND COLUMBUS, GA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1712 FINAL ENVIRONMENTAL ASSESSMENT FOR EXIDE TECHNOLOGIES ELECTRIC DRIVE VEHICLE BATTERY AND COMPONENT MANUFACTURING INITIATIVE APPLICATION, BRISTOL, TN, AND COLUMBUS, GA U.S. Department of Energy National Energy Technology Laboratory March 2010 DOE/EA-1712 iii COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Environmental Assessment for Exide Technologies Electric Drive Vehicle Battery and Component Manufacturing Initiative Application, Bristol, TN, and Columbus, GA

324

Fast Flux Test Facility final safety analysis report. Amendment 73  

SciTech Connect (OSTI)

This report provides Final Safety Analysis Report (FSAR) Amendment 73 for incorporation into the Fast Flux Test Facility (FFTR) FSAR set. This page change incorporates Engineering Change Notices (ECNs) issued subsequent to Amendment 72 and approved for incorparoration before May 6, 1993. These changes include: Chapter 3, design criteria structures, equipment, and systems; chapter 5B, reactor coolant system; chapter 7, instrumentation and control systems; chapter 9, auxiliary systems; chapter 11, reactor refueling system; chapter 12, radiation protection and waste management; chapter 13, conduct of operations; chapter 17, technical specifications; chapter 20, FFTF criticality specifications; appendix C, local fuel failure events; and appendix Fl, operation at 680{degrees}F inlet temperature.

Gantt, D.A.

1993-08-01T23:59:59.000Z

325

Fuel Storage Facility Final Safety Analysis Report. Revision 1  

SciTech Connect (OSTI)

The Fuel Storage Facility (FSF) is an integral part of the Fast Flux Test Facility. Its purpose is to provide long-term storage (20-year design life) for spent fuel core elements used to provide the fast flux environment in FFTF, and for test fuel pins, components and subassemblies that have been irradiated in the fast flux environment. This Final Safety Analysis Report (FSAR) and its supporting documentation provides a complete description and safety evaluation of the site, the plant design, operations, and potential accidents.

Linderoth, C.E.

1984-03-01T23:59:59.000Z

326

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Broader source: Energy.gov (indexed) [DOE]

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

327

DOE/EIS-0340-SA-01: Supplement Analysis for NEOH Grande Ronde-Imnaha Spring Chinook Hatchery Project (03/23/06)  

Broader source: Energy.gov (indexed) [DOE]

3, 2006 3, 2006 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for NEOH Grande Ronde - Imnaha Spring Chinook Hatchery Project (DOE/EIS-0340-SA-01) Ken Kirkman - KEWU-4 Project Manager Proposed Action: Grande Ronde - Imnaha Spring Chinook Hatchery Project Modifications Resulting from Final Design Project No.: 1988-053-01 Location: Wallowa County, Oregon Proposed By: Bonneville Power Administration (BPA) and Nez Perce Tribe Introduction: BPA, in its March 11, 2005 Record of Decision (ROD) on the Grande Ronde - Imnaha Spring Chinook Hatchery Project, decided to fund value engineering, land acquisition and final design of fish production facilities to support an ongoing program of Snake River spring chinook propagation for conservation and recovery of the species. BPA analyzed the

328

DOE/EIS-0265-SA-165: Supplement Analysis for the Watershed Management Program EIS (8/4/04)  

Broader source: Energy.gov (indexed) [DOE]

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-165) Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-165) Mickey Carter TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.1 Maintain Healthy Riparian Plant Communities, 4.12 Filter Strips, 6.1 Differed Grazing, 6.10 Access Fencing Location: Custer County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Custer Soil and Water Conservation District Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the

329

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Supplement Analysis Proposed Silo 3 Alternatives at the FEMP March 1, 1991 EIS-0026-SA-01: Supplement Analysis Transuranic Waste Characterization And Repackaging...

330

Supplement Analysis for the Business Plan EIS (DOE/EIS-0183/SA-04)  

Broader source: Energy.gov (indexed) [DOE]

e Electronic Form Approved by CILR - 09/26/2001 e Electronic Form Approved by CILR - 09/26/2001 (8-89) memorandum DATE: May 24, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Business Plan EIS (DOE/EIS-0183/SA-04) Scott Wilson - PT-5 TO: Customer Account Executive Proposed Action: Klondike Wind Project - Power Purchase Agreement, Contract Number 02PB-11093. Proposed By: Bonneville Power Administration (BPA) and Northwestern Windpower, LLC. Location: Near Wasco, Sherman County, Oregon. Description of the Proposed Action: BPA proposes to purchase 24 megawatts (MW) of wind power from the Klondike Wind Project for a term of 20 years. Analysis: The existing 24-MW Klondike Wind Project, owned and operated by Northwestern Windpower,

331

Supplement Analysis for the System Operation Review EIS (DOE/EIS-0170/SA-1)  

Broader source: Energy.gov (indexed) [DOE]

20, 2002 20, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the System Operation Review EIS (DOE/EIS-0170/SA-1) Anthony G. White - PGPL-5 Public Utility Specialist and Secretary, United States Entity Proposed Action: Non-Treaty Storage Agreement (NTSA) - Contract Extension, Contract Number DE-MS79- 90BP92754. Proposed By: Bonneville Power Administration (BPA) and B.C. Hydro and Power Authority (BC Hydro). Location: British Columbia, Canada. Description of the Proposed Action: BPA and BC Hydro propose to extend the existing NTSA for a period of one year. Analysis: On July 5, 1990, BPA and BC Hydro signed the NTSA, which expanded the amount of non- Treaty storage space available in Canada and extended the then-existing agreement from 1993 to

332

Microsoft Word - Final New England Constraint STEO Supplement 011713v1 clean _4_ LF_SP_rev cw.docx  

Gasoline and Diesel Fuel Update (EIA)

New England Natural Gas Constraints 1 New England Natural Gas Constraints 1 January 18, 2013 Short-Term Energy Outlook Supplement: Constraints in New England likely to affect regional energy prices this winter Since November, New England has had the highest average spot natural gas prices in the nation. Average prices at the Algonquin Citygate trading point, a widely used index for New England natural gas buyers, have been $3 per million British thermal units (MMBtu) higher than natural gas prices at the Henry Hub, and more than $2 per MMBtu higher than average spot price at Transco Zone 6 NY, which serves New York City and has historically traded at prices similar to those in New England (see Figure 1).

333

Final Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

I I Chapters 1 through 12 Prepared by: COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) National Nuclear Security Administration TITLE: Final Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement (DOE/EIS-0348 and DOE/EIS-0236-S3) CONTACT: For further information on this EIS, For general information on the DOE Call: 1-877-388-4930, or contact National Environmental Policy Act (NEPA) process, write or call: Thomas Grim Carol Borgstrom, Director Livermore Site Office Document Manager Office of NEPA Policy and Compliance NNSA (EH-42) 7000 East Avenue U.S. Department of Energy

334

Final Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Summary Summary Prepared by: COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) National Nuclear Security Administration TITLE: Final Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement (DOE/EIS-0348 and DOE/EIS-0236-S3) CONTACT: For further information on this EIS, For general information on the DOE Call: 1-877-388-4930, or contact National Environmental Policy Act (NEPA) process, write or call: Thomas Grim Carol Borgstrom, Director Livermore Site Office Document Manager Office of NEPA Policy and Compliance NNSA (EH-42) 7000 East Avenue U.S. Department of Energy MS L-293 1000 Independence Avenue, SW

335

DOE/EIS-0236-S1F; National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (January 2001)  

Broader source: Energy.gov (indexed) [DOE]

I: Main Text I: Main Text Prepared by U.S. Department of Energy Oakland Operations Office Oakland, California January 2001 [This page intentionally left blank] iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy TITLE: National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement CONTACT: For additional information on For general information on the NEPA this statement, write or call: process at DOE, write or call: Mr. Richard Scott, Document Manager Ms. Carol M. Borgstrom, Director U.S. Department of Energy, L-467 Office of NEPA Policy and Compliance, EH-42 7000 East Avenue, P.O. Box 808 U.S. Department of Energy Livermore, CA 94550 1000 Independence Avenue, SW Telephone: (925) 423-3022

336

Final Environmental Impact Statement (Supplement to ERDA-1537, September 1977) Waste Management Operations Double-Shell Tanks for Defense High-Level Radioactive Waste Storage Savannah River Plant  

Broader source: Energy.gov (indexed) [DOE]

Do Do E/EIS-0062 FINAL ENVIRONMENTAL IMPACT mATEIUIENT (Supplement to ERDA-1537, September 1977) Waste ~ Management Operations Savannah River Plant ! Aiken, South Carolina Double-Shell Tanks for Defense High-Level Radioactive Waste Storage April 1980 U.S. DEPARTMENT OF ENERGY WASHINGTON. D.C.20545 1980 WL 94273 (F.R.) NOTICES DEPARTMENT OF ENERGY Office of Deputy Assistant Secretary for Nuclear Waste Management Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Savannah River Plant, Aiken, S.C. Wednesday, July 9, 1980 *46154 Record of Decision Decision. The decision has been made to complete the construction of the 14 double-shell tanks and use them to store defense high-level radioactive waste at the Savannah River Plant (SRP). Background. The SRP, located near Aiken, South Carolina, is a major installation of the

337

Final Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

III III Appendix E through P Prepared by: COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) National Nuclear Security Administration TITLE: Final Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement (DOE/EIS-0348 and DOE/EIS-0236-S3) CONTACT: For further information on this EIS, For general information on the DOE Call: 1-877-388-4930, or contact National Environmental Policy Act (NEPA) process, write or call: Thomas Grim Carol Borgstrom, Director Livermore Site Office Document Manager Office of NEPA Policy and Compliance NNSA (EH-42) 7000 East Avenue U.S. Department of Energy

338

Final Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

II II Appendix A through D Prepared by: COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) National Nuclear Security Administration TITLE: Final Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement (DOE/EIS-0348 and DOE/EIS-0236-S3) CONTACT: For further information on this EIS, For general information on the DOE Call: 1-877-388-4930, or contact National Environmental Policy Act (NEPA) process, write or call: Thomas Grim Carol Borgstrom, Director Livermore Site Office Document Manager Office of NEPA Policy and Compliance NNSA (EH-42) 7000 East Avenue U.S. Department of Energy

339

Final  

Broader source: Energy.gov (indexed) [DOE]

, , Final for Vegetation Control at VHF Stations, Microwave Stations, Electrical Substations, and Pole Yards . Environmental Assessment Prepared for Southwestern Power Administration U.S. Department of Energy - _ . . . " Prepared by Black & Veatch October 13,1995 ' Table of Contents 1 . 0 Purpose and Need for Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.0 Description of the Alternatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.1 Alternative 1 . No Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.2 Alternative 2 . Mechanical and Manual Control . . . . . . . . . . . . . . . . . . . 2.3 Alternative 3 . Proposed Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.1 Foliar Spray Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.3.2 Soil-Spot Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

340

Supplement analysis for a container system for the management of DOE spent nuclear fuel located at the INEEL  

SciTech Connect (OSTI)

The Council on Environmental Quality (CEQ) regulations for implementing the NEPA, 40 CFR 1502.9 (c), directs federal agencies to prepare a supplement to an environmental impact statement when an agency makes substantial changes in the Proposed Action that are relevant to environmental concerns, or there are significant new circumstances or information relevant to environmental concerns and bearing on the Proposed Action or impacts. When it is unclear whether a supplemental environmental impact statement is required, DOE regulations (10 CFR 1021.314) direct the preparation of a supplement analysis to assist in making that determination. This supplement analysis evaluates the impacts of employing dual-purpose canisters (DPCs) to prepare DOE SNF located at the INEEL for interim onsite storage and transport outside the State of Idaho. Impacts associated with DPC manufacturing, loading and storage of DOE-ID SNF into DPCs, transport of loaded DPCs outside Idaho, and the cumulative impacts are compared with the impacts previously analyzed in the SNF and INEL EIS and the Navy Container System EIS. This SA provides information to determine whether: (1) an existing EIS should be supplemented; (2) a new EIS should be prepared; or (3) no further NEPA documentation is required.

NONE

1999-03-12T23:59:59.000Z

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Urban Integrated Industrial Cogeneration Systems Analysis. Phase II final report  

SciTech Connect (OSTI)

Through the Urban Integrated Industrial Cogeneration Systems Analysis (UIICSA), the City of Chicago embarked upon an ambitious effort to identify the measure the overall industrial cogeneration market in the city and to evaluate in detail the most promising market opportunities. This report discusses the background of the work completed during Phase II of the UIICSA and presents the results of economic feasibility studies conducted for three potential cogeneration sites in Chicago. Phase II focused on the feasibility of cogeneration at the three most promising sites: the Stockyards and Calumet industrial areas, and the Ford City commercial/industrial complex. Each feasibility case study considered the energy load requirements of the existing facilities at the site and the potential for attracting and serving new growth in the area. Alternative fuels and technologies, and ownership and financing options were also incorporated into the case studies. Finally, site specific considerations such as development incentives, zoning and building code restrictions and environmental requirements were investigated.

Not Available

1984-01-01T23:59:59.000Z

342

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70)  

Broader source: Energy.gov (indexed) [DOE]

(8-89) memorandum DATE: 7/19/02 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-70) Bill Erickson - TFP/Walla Walla Natural Resource Specialist TO: Proposed Action: Vegetation Management on sections of the McNary-Ross, McNary-Horse Heaven, Horse Heaven-Harvarlum, Harvarlum-Big Eddy, and Hanford-John Day Transmission lines. The treatment areas are identified in Step 1 of the Planning Steps shown below. The work will involve the control of noxious weeds in the subject rights-of-ways (ROWs). Location: The ROWs are located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington, all being in the Walla Walla and Redmond Regions.

343

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42)  

Broader source: Energy.gov (indexed) [DOE]

5, 2002 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Snohomish - Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet. Location: The ROW is located in Snohomish County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove both reclaim and danger trees inside and outside the transmission line right of way. BPA crews or contract crews will cut only trees that have

344

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-29)  

Broader source: Energy.gov (indexed) [DOE]

Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-29) Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-29) Charlie Craig - KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Blue Creek Winter Range - Spokane Reservation (Acquisition of Smith and Parsons Properties) Project No: 1991-062-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.1 Fee Title Acquisition and Transfer Location: On the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington Proposed by: Bonneville Power Administration (BPA) and the Spokane Tribe of Indians Description of the Proposed Action: BPA proposes to fund the purchase of three parcels of land within the boundaries of the Spokane Indian Reservation, totaling approximately 870 acres.

345

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40)  

Broader source: Energy.gov (indexed) [DOE]

9, 2002 9, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-40) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Allston-Keeler 500 kV Transmission Line ROW exclusive to BLM lands between 8/4 through 27/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 150 feet. Location: The ROW is located in Washington and Columbia County, in the State of Oregon, Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

346

Colville Resident Trout Hatchery Project Supplement Analysis (DOE/EA-0307-SA-01)  

Broader source: Energy.gov (indexed) [DOE]

2, 2003 2, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Colville Resident Trout Hatchery Project Supplement Analysis (DOE/EA-0307-SA-01) TO: Greg Baesler Project Manager - KEWU-4 Proposed Action: Colville Resident Trout Hatchery Project-Modifications to original proposal Project No.: 1985-038-00 Location: Colville Indian Reservation, Okanogan County, Washington Proposed by: Bonneville Power Administration (BPA) Introduction: The Bonneville Power Administration prepared an Environmental Assessment (DOE/EA-0307) for the Colville Resident Hatchery Project (Project) and published a Finding of No Significant Impact (FONSI) in the Federal Register on September 8, 1986 (Vol. 51, No.173). The Project involved the design, site selection, construction, operation and maintenance of a

347

Supplement Analysis for the Business Plan EIS (DOE/EIS-0183/SA-06)  

Broader source: Energy.gov (indexed) [DOE]

May 28, 2004 May 28, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Business Plan EIS (DOE/EIS-0183/SA-06) Deb Malin Project Manager - PT-5 Proposed Action: Memorandum of Agreement between Bonneville Power Administration (BPA) and Bonneville Environmental Foundation (BEF) to help support BEF's renewable resources activities. Location: Unknown at this time, but likely throughout the Pacific Northwest. Proposed by: BPA and BEF. Description of the Proposed Action: BPA proposes to enter into a Memorandum of Agreement (MOA) to provide annual funding to the BEF. The BEF is a non-profit organization that supports watershed restoration programs and development of new sources of renewable energy, such as wind, solar, hydro, and landfill gas, in the Pacific Northwest. The MOA would

348

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35)  

Broader source: Energy.gov (indexed) [DOE]

14, 2001 14, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-35) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line ROW and the Mossy Rock-Chehalis Transmission Line ROW, between 7/1 to 27/10. The proposed work will be accomplished in the indicated sections of the transmission line corridor with an average corridor width of 162 feet. Location: The ROW is located in Lewis County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

349

DOE/EA-1440-S-1: Finding of No Significant Impact for Final Supplement to the Final Site-Wide Environmental Assessment of the National Renewable Energy Laboratory's South Table Mountain Complex (5/15/08)  

Broader source: Energy.gov (indexed) [DOE]

7 Cole Boulevard 7 Cole Boulevard Golden, Colorado 80401 -3305 May 14,2008 FINDING OF NO SIGNIFICANT IMPACT for SUPPLEMENT TO FINAL SITE-WIDE ENVIRONMENTAL ASSESSMENT OF THE NATIONAL RENEWABLE ENERGY LABORATORY'S SOUTH TABLE MOUNTAIN COMPLEX AGENCY: Department of Energy, Golden Field Office ACTION: Finding of No Significant Impact SUMMARY: 111 accordance with the Department of Energy (DOE) National Environmental Policy Act (NEPA) implementing regulations, DOE evaluated the potential environniental impacts that would result from three actions at the National Renewable Energy Laboratory's (NREL) South Table Mountain (STM) site: Proposed Construction and Operation o f Research Suppol-t Facilities (RSF), Infrastructure Improvements (Phase I), Upgrades to tlie Thermochemical User Facility (TCUF) and addition of the

350

EIS-0236-SA6; Draft Supplemental Analysis: Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile, Stewardship  

Broader source: Energy.gov (indexed) [DOE]

6/25/99 6/25/99 DRAFT SUPPLEMENT ANALYSIS: PIT MANUFACTURING FACILITIES AT LOS ALAMOS NATIONAL LABORATORY, STOCKPILE STEWARDSHIP AND MANAGEMENT PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT June 1999 SUMMARY ............................................................................................................................... 3 INTRODUCTION ..................................................................................................................... 3 Purpose of this Document .................................................................................................................................. 3 Background - SSM PEIS ...................................................................................................................................

351

Supplemental Figures: Figure S1. Analysis of endo-siRNA targets in different microarray datasets. The  

E-Print Network [OSTI]

Supplemental Figures: Figure S1. Analysis of endo-siRNA targets in different microarray datasets. The percentage of each array dataset that were predicted endo-siRNA targets according to the Ambros dataset (Lee et al. 2006) was plotted [(number of endo-siRNA targets in microarray dataset / total genes

Bass, Brenda L.

352

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 20, 2003 March 20, 2003 EIS-0285-SA-133: Supplement Analysis Transmission System Vegetation Management Program March 19, 2003 EIS-0285-SA-132: Supplement Analysis Transmission System Vegetation Management Program March 12, 2003 EIS-1069-SA-06: Supplement Analysis Yakima/Kilickitat Fisheries Project March 10, 2003 EIS-0225-SA-03: Supplement Analysis Continued Operation of the National Nuclear Security Administration, Pantex Plant and Associated Storage of Nuclear Weapon Components March 10, 2003 EIS-0285-SA-130: Supplement Analysis Transmission System Vegetation Management Program March 7, 2003 EIS-0285-SA-129: Supplement Analysis Transmission System Vegetation Management Program March 6, 2003 EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program

353

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 14, 2001 September 14, 2001 EIS-0265-SA-62: Supplement Analysis Watershed Management Program and the Hood River Fisheries Project September 13, 2001 EIS-0246-SA-17: Supplement Analysis Wildlife Management Program September 11, 2001 EIS-0285-SA-26: Supplement Analysis Transmission System Vegetation Management Program September 5, 2001 EIS-0285-SA-28: Supplement Analysis Transmission System Vegetation Management Program September 5, 2001 EIS-0285-SA-25: Supplement Analysis Transmission System Vegetation Management Program August 17, 2001 EIS-0285-SA-23: Supplement Analysis Transmission System Vegetation Management Program August 17, 2001 EIS-0285-SA-22: Supplement Analysis Transmission System Vegetation Management Program, King and Snohomish Counties, WA, in the Snohomish Region

354

EA-1110: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Final Environmental Assessment 0: Final Environmental Assessment EA-1110: Final Environmental Assessment Vegetation Control at VHF Stations, Microwave Stations, Electrical Substations, and Pole Yards The purpose of this environmental assessment is to evaluate the alternatives available for controlling vegetative growth at very high frequency (VHF) and microwave radio stations, electrical substations, and pole yards to support the transmission of electrical power throughout Arkansas, Missouri, and Oklahoma. Final Environmental Assessment for Vegetation Control at VHF Stations, Microwave Stations, Electrical Substations, and Pole Yards, DOE/EA-1110 (October 1995) More Documents & Publications EA-1110: Finding of No Significant Impact EIS-0285-SA-139: Supplement Analysis EIS-0285-SA-40: Supplement Analysis

355

DOE/EIS-0251; Supplemental Analysis For a Container System for the Management of DOE Spent Nuclear Fuel Located at the INEEL  

Broader source: Energy.gov (indexed) [DOE]

ID-10636 ID-10636 SUPPLEMENT ANALYSIS FOR A CONTAINER SYSTEM FOR THE MANAGEMENT OF DOE SPENT NUCLEAR FUEL LOCATED AT THE INEEL March 1999 U.S. Department of Energy Idaho Operations Office Idaho Falls, Idaho DOE/ID-10636 SUPPLEMENT ANALYSIS FOR A CONTAINER SYSTEM FOR THE MANAGEMENT OF DOE SPENT NUCLEAR FUEL LOCATED AT THE INEEL March 1999 Department of Energy Idaho Operations Office Idaho Falls, Idaho SNF Supplement Analysis ii March 1999 CONTENTS Acronyms and Abbreviations .............................................................................................. v Summary ..........................................................................................................................S-1 1.0 Purpose and Proposed Action ......................................................................................

356

Tatum Dome field study report and monitoring data analysis: A supplemental report  

SciTech Connect (OSTI)

This report is a supplement to the Water Resources Center, Desert Research Institute report, DOE/NV/10384-03, ``Tatum Dome Field Study Report and Monitoring Data Analysis,`` Water Resources Center Publication No. 45044. The field study was initiated during the Spring of 1984 because of persistent tritium concentrations in the Surficial Aquifer determined from observed annual water samples from the series of hydrologic monitoring holes (HMH). An anomalous increase in tritium concentrations in monthly water samples from some of the hydrologic monitoring holes was also observed during the Spring of 1984 by the State of Mississippi, Division of Radiological Health. This Spring increase in tritium concentrations may well have been present earlier, but was not recognized because monthly tritium concentration data were not collected prior to 1984. It is hypothesized that groundwater in the Surficial Aquifer is made up of two layers. The older and deeper water within the Surficial Aquifer contains tritium contamination. The shallower water, infiltrating from recent precipitation, is essentially tritium free. These waters do not naturally mix completely and are only significantly mixed in the hydrologic monitoring holes by the sampling procedure. The quantity of shallow infiltrating precipitation available for mixing varies inversely with the rate of evapotranspiration. Since dispersive mixing along the boundary between the two waters also occurs as a result of groundwater movement, the average concentration of tritium in the Surficial Aquifer is decreased by dilution as well as radioactive decay.

Fenske, P.R.

1989-09-01T23:59:59.000Z

357

Tatum Dome field study report and monitoring data analysis: A supplemental report  

SciTech Connect (OSTI)

This report is a supplement to the Water Resources Center, Desert Research Institute report, DOE/NV/10384-03, Tatum Dome Field Study Report and Monitoring Data Analysis,'' Water Resources Center Publication No. 45044. The field study was initiated during the Spring of 1984 because of persistent tritium concentrations in the Surficial Aquifer determined from observed annual water samples from the series of hydrologic monitoring holes (HMH). An anomalous increase in tritium concentrations in monthly water samples from some of the hydrologic monitoring holes was also observed during the Spring of 1984 by the State of Mississippi, Division of Radiological Health. This Spring increase in tritium concentrations may well have been present earlier, but was not recognized because monthly tritium concentration data were not collected prior to 1984. It is hypothesized that groundwater in the Surficial Aquifer is made up of two layers. The older and deeper water within the Surficial Aquifer contains tritium contamination. The shallower water, infiltrating from recent precipitation, is essentially tritium free. These waters do not naturally mix completely and are only significantly mixed in the hydrologic monitoring holes by the sampling procedure. The quantity of shallow infiltrating precipitation available for mixing varies inversely with the rate of evapotranspiration. Since dispersive mixing along the boundary between the two waters also occurs as a result of groundwater movement, the average concentration of tritium in the Surficial Aquifer is decreased by dilution as well as radioactive decay.

Fenske, P.R.

1989-09-01T23:59:59.000Z

358

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-79) (5/20/02)  

Broader source: Energy.gov (indexed) [DOE]

0, 2002 0, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-79) Joe DeHerrera Fish and Wildlife Project Manager, KEWU-4 Proposed Action: Eisminger/ CREP Dike Relocation Project No: 1992-026-01 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection through Vegetation Management, 2.1 Maintain Healthy Riparian Plant Communities, 2.3 Creation of Wetlands to Provide Near Channel Habitat and Store Water for Land Use, 2.7 Avoid Exotic Species, 2.4 Provide Filter Strips to Catch Sediment and Other Pollutants, 6.1 Deferred Grazing. Location: Union County, Oregon

359

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) (10/4/01)  

Broader source: Energy.gov (indexed) [DOE]

4, 2001 4, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-67) Jay Marcotte Fish and Wildlife Project Manager Proposed Action: Install Fish Screens to Protect ESA Listed Steelhead and Bull Trout in the Walla Walla Basin. Project No: 2001-039-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.15 Fish Passage Enhancement - Fishways. Location: Various Walla Walla River Basin Irrigation Diversions, Washington Proposed by: Bonneville Power Administration (BPA), the Walla Walla County Conservation District. Description of the Proposed Action: BPA is proposing to provide cost share for a program that

360

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-71) (10/29/01)  

Broader source: Energy.gov (indexed) [DOE]

29, 2001 29, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-71) Alan Ruger Fish and Wildlife Project Manager Proposed Action: Duncan Creek Channel Rehabilitation Project Project No: 2001-053-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.11 Remove Debris Functioning as Barrier to Passage, 1.16 Spawning Habitat Enhancements, 2.1 Maintain Healthy Riparian Plant Communities, 2.9 Mechanical Vegetation Control. Location: Skamania County, Washington. Proposed by: Bonneville Power Administration (BPA), and the Washington State Department of Fish and Wildlife (WDFW)

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

(DOE/EIS-0265/SA-102): Supplement Analysis for the Watershed Management Program EIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-102) David Byrnes, KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Tributary Access and Habitat Program - Ellensburg Water Company/ Cooke Creek Diversion Project Project No: 2002-025-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.5 Install Grade Control Structures and Check Dams; 1.7 Install Other Habitat Complexity Structures; 1.8 Bank Protection Through Vegetation Management; 1.15 Fish Passage Enhancement - Fishways; 2.1 Maintain Healthy Riparian Plant Communities; 4.10 Water Conveyance - Pipeline; 4.20 Water

362

(DOE/EIS-0246/SA-23): Supplement Analysis for the Wildlife Mitigation Program EIS 5/15/02  

Broader source: Energy.gov (indexed) [DOE]

15, 2002 15, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-23) David Sill Fish and Wildlife Project Manager Proposed Action: Canby Ferry Conservation Easement Project No: 1992-068-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.2 Easement Acquisition Location: Clackamas County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Oregon Department of Fish and Wildlife (ODFW) Description of the Proposed Action: BPA proposes to purchase a conservation easement on approximately 16 acres of the Canby Ferry parcel in Clackamas County, Oregon for the protection

363

DOE/EIS-0265-SA-166: Supplement Analysis for the Watershed Management Program EIS (8/6/04)  

Broader source: Energy.gov (indexed) [DOE]

6, 2004 6, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-166) Jay Marcotte Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Idaho Model Watershed Habitat Projects - Coleman Creek Fish Passage Restoration Project No: 2002-025-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection through Vegetation Management, 1.9 Structural Bank Protection Using Bioengineering Methods, 1.13 Culvert Removal/Replacement to Improve Fish Passage, 1.16 Spawning Habitat Enhancements, 2.6 Native Seed Inventories, 2.7 Avoid Exotic Species, 2.9 Mechanical Vegetation Removal, 4.2 Water Measuring

364

EIS(DOE/EIS-0246/SA-19) Supplement Analysis for the Wildlife Mitigation Program EIS 12/12/01  

Broader source: Energy.gov (indexed) [DOE]

December 12, 2001 December 12, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-19) David Sill, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Bader Property Acquisition Project No: 1992-061-06 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition. Location: St. Joe Watershed on the Coeur d'Alene Indian Reservation, Idaho Proposed by: Bonneville Power Administration (BPA) and the Coeur d'Alene Tribe Description of the Proposed Action: BPA proposes to purchase approximately 650 acres of private property that border the St. Joe River near Goose Heaven Lake on the Coeur d'Alene Indian Reservation

365

(DOE/EIS-0265/SA-100): Supplement Analysis for the Watershed Management Program EIS 11/25/02  

Broader source: Energy.gov (indexed) [DOE]

November 25, 2002 November 25, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-100) Tracey Yerxa TO: Fish and Wildlife Project Manager, KEWL-4 Proposed Action: Oregon Fish Screening Project, Screen Replacements 2003 Project No: 1993-066-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.8 Bank Protection; 1.9 Structural Bank Protection using Bio Engineering Techniques; 1.10 Structural Bank Protection using Engineering Structures; 1.14 Reduce Scour and Deposition at Hydraulic Structures; 1.15 Fish Passage Enhancement-Fishways; 1.16 Spawning Habitat Enhancements;

366

(DOE/EIS-0265/SA-88): Supplement Analysis for the Watershed Management Program EIS (08/26/02)  

Broader source: Energy.gov (indexed) [DOE]

6, 2002 6, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-88) John Baugher, KEWL-4 TO: Fish and Wildlife Project Manager Proposed Action: John Day Watershed Restoration (2002-2003) Project No: 1998-018-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 4.2 Water Measuring Devices; 4.10 Water Conveyance Pipeline; 4.25 Consolidate / Replace Irrigation Diversion Dams; 6.5 Water Supply: Pipeline. Location: Canyon City, Grant County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Confederated Tribes of the Warm Springs Reservation of Oregon.

367

(DOE/EIS-0246/SA-28): Supplement Analysis for the Wildlife Mitigation Program EIS 7/24/02  

Broader source: Energy.gov (indexed) [DOE]

24, 24, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-28) David Byrnes Fish and Wildlife Project Manager Proposed Action: Lower Naches River Land Acquisition, Yakima River Side Channels Project Project No: 1997-051-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.15 Acquisition of Sensitive Riparian Resources Location: Yakima County, Washington Proposed by: Bonneville Power Administration (BPA) and The Yakama Nation Description of the Proposed Action: BPA proposes to purchase four parcels of private land that total approximately 125 acres located in south-central Washington along the Naches River in Yakima County. Following acquisition, title to the land will be held by The Yakama Nation. The goal of this project

368

DOE/EIS-0265-SA-163: Supplement Analysis for the Watershed Management Program EIS (8/04/04)  

Broader source: Energy.gov (indexed) [DOE]

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-163) John Baugher TO: Fish and Wildlife Project Manager, KEWL-4 Proposed Action: John Day Watershed Restoration Program Project No: 1998-018-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 4.2 Water Measuring Devices 4.10 Water Conveyance Pipeline, 4.25 Consolidate/Replace Irrigation Diversion Dams, 6.5 Water Supply: Pipeline, 6.10 Access: Fencing; 8.13 Stand Thinning; 8.15 Manage Stands to Enhance Snowpack Location: Sites within the John Day River Watershed, in Wheeler County and Grant County, Oregon Proposed by: Bonneville Power Administration (BPA) and the Confederated Tribes of the Warm

369

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-69) (11/15/01)  

Broader source: Energy.gov (indexed) [DOE]

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS, (DOE/EIS-0265/SA-69) Linda Hermeston - KEWL Fish and Wildlife Project Manager Proposed Action: Improvement of Anadromous Fish Habitat and Passage in Omak Creek Project No: 2000-001-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.6 Install Large Woody Debris Structures; 1.7 Install Other Habitat Complexity Structures; 1.8 Bank Protection Through Vegetation Management; 1.9 Structural bank protection using bioengineering methods; 1.13 Culvert Removal/Replacement to improve fish passage; 1.16 Spawning habitat enhancements; 1.17 Rearing habitat enhancement.

370

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) (9/17/01)  

Broader source: Energy.gov (indexed) [DOE]

7, 2001 7, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-63) Joe DeHerrera Fish and Wildlife Project Manager Proposed Action: Pelican Creek Crossing Improvement Project No: 1992-026-01 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.13 Culvert Removal/Replacement to Improve Fish Passage. Location: Pelican Creek, Union County, Oregon Proposed by: Bonneville Power Administration (BPA), the Grande Ronde Model Watershed Program (GRMWP), and the Union County Public Works Department (UCPWD) Description of the Proposed Action: BPA provides funds to the Grande Ronde Model Watershed

371

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-32) 5/20/03  

Broader source: Energy.gov (indexed) [DOE]

May 20, 2003 May 20, 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-32) Joe DeHerrera, KECU-4 TO: Fish and Wildlife Project Manager Proposed Action: Zumwalt Prairie Preserve Conservation Easement Project No: 2001-043-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques-1.2 Easement Acquisition. Location: Wallowa County, Oregon Proposed by: Bonneville Power Administration (BPA) and The Nature Conservancy Description of the Proposed Action: BPA proposes to purchase a conservation easement on the Zumwalt Prairie Preserve, which is currently owned by The Nature Conservancy. The

372

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-78) (5/9/02)  

Broader source: Energy.gov (indexed) [DOE]

May 9, 2002 May 9, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-78) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase II (modification to DOE/EIS-0265/SA-72). Project No: 1997-051-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and The Yakama Nation Description of the Proposed Action: BPA proposes to purchase approximately 310 acres of privately-owned

373

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-66) (10/4/01)  

Broader source: Energy.gov (indexed) [DOE]

04, 2001 04, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-66) John Baugher - KEW-4 Tom Morse - KEW-4 Fish and Wildlife Project Managers Proposed Action: Water Right Acquisition Program Project No: 2001-023-00 (Fifteenmile Subbasin Water Right Acquisition Program) 1999-008-00 (Columbia Plateau Water Right Acquisition Program) 2001-056-00 (Trout Creek 2001 Streamflow Enhancement) 2001-069-00 (John Day Basin Stream Enhancement Project, Summer 2001) Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 4.18 Purchase / Negotiate Water Right; 4.19 File for Instream Water Right.

374

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-70) (10/23/01)  

Broader source: Energy.gov (indexed) [DOE]

23, 2001 23, 2001 REPLY TO ATTN OF: KECN-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-70) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase I. Project No: 1997-051-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Description of the Proposed Action: BPA proposes to purchase 4 privately owned parcels totaling

375

DOE/EIS-0265-SA-164: Supplement Analysis for the Watershed Management Program EIS (8/2/04)  

Broader source: Energy.gov (indexed) [DOE]

, 2004 , 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-164) Mickey Carter TO: Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - L-9 Irrigation Diversion Modification Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish Passage Enhancement - Fishways, 4.1 Irrigation Water Management, 4.2 Water Measuring Devices, 4.23 Intake and Return Diversion Screens, 4.25 Consolidation/Replace Irrigation Diversion Dams Location: Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Lemhi Soil and Water Conservation District

376

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-59) (8/14/01)  

Broader source: Energy.gov (indexed) [DOE]

14, 2001 14, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-59) David Byrnes Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Reestablish Safe Access into Tributaries of the Yakima Subbasin, Tucker Creek Fish Passage Project Project No: 98-034-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.15 Fish Passage Enhancement - Fishways/Screening, 1.16 Spawning Habitat Enhancements, 1.17 Rearing Habitat Enhancements, 1.5 Install Grade Control Structures and Check Dams. Location: Tucker Creek, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and the Yakama Nation Fisheries

377

EIS(DOE/EIS-0246/SA-20) Supplement Analysis for the Wildlife Mitigation Program EIS 3/7/02  

Broader source: Energy.gov (indexed) [DOE]

March 7, 2002 March 7, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-20) Allyn Meuleman, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Camas Prairie Acquisition, Anderson Ranch Dam Phase II Project No: 1995-057-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition and Transfer Location: Camas and Elmore Counties, Idaho Proposed by: Bonneville Power Administration (BPA) and the Idaho Department of Fish and Game (IDFG) Description of the Proposed Action: BPA proposes to purchase approximately 1,370 acres of

378

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-68)(10/12/01)  

Broader source: Energy.gov (indexed) [DOE]

12, 2001 12, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-68) Joe DeHerrera Fish and Wildlife Project Manager Proposed Action: Mill Creek and Little Creek Crossing Improvement Project No: 1992-026-01 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.13 Culvert Removal/Replacement to Improve Fish Passage. Location: Mill Creek and Little Creek, Union County, Oregon Proposed by: Bonneville Power Administration (BPA), the Grande Ronde Model Watershed Program (GRMWP), and the Union County Public Works Department (UCPWD) Description of the Proposed Action: BPA provides funds to the Grande Ronde Model Watershed

379

(DOE/EIS-0265/SA-101): Supplement Analysis for the Watershed Management EIS 1/2/03  

Broader source: Energy.gov (indexed) [DOE]

, 2003 , 2003 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-101) Mark Shaw, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Restoration of Anadromous Fish Access to Hawley Creek Project No: 2001-052-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 4.18: Purchase / Negotiate Water Right Location: Lemhi, Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Lemhi Soil and Water Conservation District, with the cooperation of the Idaho Governor's Office of Species Conservation. Description of the Proposed Action: BPA proposes to fund a project to enhance fish habitat on

380

(DOE/EIS-0285/SA-27): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 6/28/02  

Broader source: Energy.gov (indexed) [DOE]

June 28, 2002 June 28, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-27) Ron Morinaka, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Abbot Creek Fish Barrier Project (Hungry Horse Mitigation / Habitat Improvements) Project No: 1991-19-03 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 8.2 Control of Predators and Nuisance Animals Location: Kalispell, Flathead County, Montana Proposed by: Bonneville Power Administration (BPA) and Montana Fish, Wildlife & Parks Description of the Proposed Action: BPA proposes to fund a fishery enhancement project where a fish passage barrier will be installed in Abbot Creek to remove introduced rainbow trout

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-72)(12/3/01)  

Broader source: Energy.gov (indexed) [DOE]

December 3, 2001 December 3, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-72) David Byrnes - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase II. Project No: 1997-051-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 2.15 Acquisition of Sensitive Riparian Resources. Location: Yakima River Basin, Kittitas County, Washington Proposed by: Bonneville Power Administration (BPA) and The Yakama Nation Description of the Proposed Action: BPA proposes to purchase 2 privately owned parcels

382

(DOE/EIS-0246/SA-26): Supplement Analysis for the Wildlife Mitigation Program EIS (07/3/02)  

Broader source: Energy.gov (indexed) [DOE]

3, 2002 3, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-26) David Sill Fish and Wildlife Project Manager Proposed Action: Windy Bay Property Acquisition Project No: 1990-044-03 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition and Transfer Location: Kootenai County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Coeur d'Alene Tribe Description of the Proposed Action: BPA proposes to purchase approximately 150 acres of land located at the mouth of Lake Creek on Lake Coeur d'Alene on the Coeur d'Alene Indian Reservation in Kootenai County, Idaho. Title to the land will be held by the Coeur d'Alene

383

DOE/EIS-0246-SA-16: Supplement Analysis for the Wildlife Mitigation Program EIS (8/9/01)  

Broader source: Energy.gov (indexed) [DOE]

9, 2001 9, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-16) Brad Miller, KEWU-4 Fish and Wildlife Project Manager Proposed Action: Johnson Property Acquisition Project No: 1992-061-06 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition. Location: Benewah Watershed on the Coeur d'Alene Indian Reservation, Idaho Proposed by: Bonneville Power Administration (BPA) and the Coeur d'Alene Tribe Description of the Proposed Action: BPA proposes to purchase three parcels totaling 411 acres of private property on the Coeur d'Alene Indian Reservation as partial mitigation for

384

Supplement Analysis for the Watrshed Management Program EIS (DOE/EIS-0265/SA-75) (2/20/02)  

Broader source: Energy.gov (indexed) [DOE]

20, 2002 20, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-75) Peter Lofy - KEWL-4 Fish and Wildlife Project Manager Proposed Action: Gourlay Creek Fish Ladder Project Project No: 2001-038-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.15 Fish Passage Enhancement - Fishways. Location: Columbia County, Oregon Proposed by: Bonneville Power Administration (BPA) and the City of Scappoose Description of the Proposed Action: BPA proposes to fund the construction of a fish passage facility at the Gourlay Creek Dam/water reservoir in Columbia County, Oregon. The City of

385

EIS (DOE/EIS-0246/SA-18) Supplement Analysis for the Watershed Management Program EIS 10/17/01  

Broader source: Energy.gov (indexed) [DOE]

DATE: October 17, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-18) Charlie Craig - KEWU Fish and Wildlife Project Manager Proposed Action: Eugene Wetlands Acquisition Phase II Project No: 1992-059-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): Resource Acquisition Techniques - 1.1 Fee- Title Acquisition, 1.2 Easement Acquisition. Location: Lane County, Oregon Proposed by: Bonneville Power Administration (BPA) and The Nature Conservancy Description of the Proposed Action: BPA proposes to fund the acquisition and preservation of approximately 99 acres of native wet prairie and oak woodland habitat in Lane County, Oregon.

386

DOE/EIS-0240-SA-1: Supplement Analysis for the Disposition of Surplus Highly Enriched Uranium (October 2007)  

Broader source: Energy.gov (indexed) [DOE]

0-SA1 0-SA1 SUPPLEMENT ANALYSIS DISPOSITION OF SURPLUS HIGHLY ENRICHED URANIUM October 2007 U.S. Department of Energy National Nuclear Security Administration Office of Fissile Materials Disposition Washington, D.C. i TABLE OF CONTENTS 1.0 Introduction and Purpose .................................................................................................................1 2.0 Background......................................................................................................................................1 2.1 Scope of the HEU EIS............................................................................................................ 2 2.2 Status of Surplus HEU Disposition Activities .......................................................................

387

SUPPLEMENT ANALYSIS OF FOREIGN RESEARCH REACTOR srENT NUCLEAR FUEL  

Broader source: Energy.gov (indexed) [DOE]

FOREIGN RESEARCH REACTOR srENT NUCLEAR FUEL FOREIGN RESEARCH REACTOR srENT NUCLEAR FUEL TRANSPORTATION ALONG OTHER THAN~. PRESENTATIVE ROUTE FROM CONCORD NAVAL WEAPO~~ STATION TO IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LADORA TORY Introduction The Department of Energy is planning to transport foreign research reactor spent nuclear fuel by rail from the Concord Naval Weapons Station (CNWS), Concord, California, to the Idaho National Engineering and Environmental Laboratory (INEEL). The environmental analysis supporting the decision to transport, by rail or truck, foreign research reactor spent nuclear fuel from CNWS to the INEEL is contained in +he Final Environmental Impact Statement on a Proposed Nuclear Weapons Nonproliftration Policy Concerning Foreign Research Reactor

388

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Supplemental Tables to the Annual Energy Outlook 2005 Supplemental Tables to the Annual Energy Outlook 2005 EIA Glossary Supplemental Tables to the Annual Energy Outlook 2005 Release date: February 2005 Next release date: February 2006 The AEO Supplemental tables were generated for the reference case of the Annual Energy Outlook 2005 (AEO2005) using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets for 2003 to 2025. Most of the tables were not published in the AEO2005, but contain regional and other more detailed projections underlying the AEO2005 projections. The files containing these tables are in spreadsheet format. A total of one hundred and seventeen tables is presented. The data for tables 10 and 20 match those published in AEO2005 Appendix tables A2 and A3, respectively. Forecasts for 2003-2005 may differ slightly from values published in the Short Term Energy Outlook, which are the official EIA short-term forecasts and are based on more current information than the AEO.

389

DOE/EIS-0026-SA-4: Supplement Analysis for Use of the 10-160B Transportation Cask for RH-TRU Waste Shipments to WIPP (12/17/02)  

Broader source: Energy.gov (indexed) [DOE]

1-04 15,22 FROM,L AND M TECH 1-04 15,22 FROM,L AND M TECH ID,5052347038 PAGE 3/15 [TX/RX NO 6044] 141003 08/31/2004 TOE 15:22 PAGE 4/15 IC,5052347038 AUG-31-04 15,22 FROM,L AND M TECH PAGE 1 of 9 Supplement Analysis for USE OF THE IO-160B TRANSPORTATION CASK FOR RH-TRUWASTE SHIPMENTS TO WIPP 1.0 INTRODUCTION The U.S. Department of Energy (DOE) is propo~ing to use the CNS lO-160B, Type B Shipping Cask (referred to in this document simply as the lO-160B) to transport remote handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP). DOE originally examined the impacts ofWlPP operations in the Waste Isolation Pilot Plant Disposal Phase Final Supplemental Environmental Impact Statement, DOE/EIS-OO26-S-2, (SEIS~II). This Supplement Analysis (SA) discusses environmental impacts associated with

390

Enforcement Guidance Supplement 99-03, Limitation of 10 CFR 830 to Equipment Referenced in the Safety Analysis Report  

Broader source: Energy.gov (indexed) [DOE]

for Enforcement Department of Energy Washington DC 20585 October 20, 1999 MEMORANDUM FOR: DOE and Contractor PAAA Coordinators FROM: R. Keith Christopher Director Office of Enforcement and Investigation SUBJECT: Enforcement Guidance Supplement 99-03: Limitation of 10 CFR Part 830 to Equipment Referenced in the Safety Analysis Report Recently this Office received a reply to a Preliminary Notice of Violation (PNOV), although not denying any facts or conclusions in the PNOV and agreeing to pay the full imposed Civil Penalty, included arguments that some of the equipment cited in the

391

(DOE/EIS-0285/SA-41): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 February 27, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-41) William Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management around wood poles in Transmission Line ROW's in the Walla Walla Region (see attached checklist for identification). The proposed work will be accomplished in the indicated sections of the transmission line corridors with the easement width ranging from 0 to 200 feet. Location: The ROWs are located in Walla Walla Region (see checklist). Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation around

392

(DOE/EIS-0285/SA-81): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 7/9/02  

Broader source: Energy.gov (indexed) [DOE]

July 9,2002 July 9,2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-81) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for fifteen Substations in The Dalles District. (See list of facilities under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within The Dalles District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what

393

(DOE/EIS-0285/SA-74): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 7/1/02  

Broader source: Energy.gov (indexed) [DOE]

2002 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-74) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for five Substations in the Malin District. (See list of facilities under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Malin District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what mitigation measures are required to protect those resources. In addition,

394

(DOE/EIS-0285/SA-82): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 13, 2002)  

Broader source: Energy.gov (indexed) [DOE]

3,2002 3,2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-82 Jeffrey Hathhorn Redmond Deputy Regional Manager - TFI/IDAHO FALLS Proposed Action: Vegetation Management for twenty-four Substations in the Burley District. See list of facilities under planning step 1). Location: See list of facilities under Planning Step 1. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Burley District of the Idaho Falls Region. Analysis: The attached checklist shows the resources that were found during this analysis and what

395

(DOE/EIS-0285/SA-78): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (07/01/02)  

Broader source: Energy.gov (indexed) [DOE]

2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-78) Randy Melzer Redmond Deputy Regional Manager - TFR/REDMOND Proposed Action: Vegetation Management for ten Substations in the Redmond District. (See list of facilities listed under planning step 1). Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes total vegetation management (bare ground) in the electrical substations, and, noxious weed management and maintenance of landscaping within the property boundaries of the listed facilities. These facilities are all located within the Redmond District of the Redmond Region. Analysis: The attached checklist shows the resources that were found during this analysis and what mitigation measures are required to protect those resources. In

396

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 10, 2004 August 10, 2004 EIS-0265-SA-169: Supplement Analysis Watershed Management Program August 10, 2004 EIS-0265-SA-168: Supplement Analysis Watershed Management Program August 9, 2004 EIS-0265-SA-167: Supplement Analysis Watershed Management Program August 6, 2004 EIS-0265-SA-166: Supplement Analysis Watershed Management Program August 4, 2004 EIS-0310-SA-01: Supplement Analysis Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States August 4, 2004 EIS-0265-SA-165: Supplement Analysis Watershed Management Program - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence August 4, 2004 EIS-0265-SA-163: Supplement Analysis Watershed Management Program August 2, 2004 EIS-0265-SA-164: Supplement Analysis

397

Vertically integrated analysis of human DNA. Final technical report  

SciTech Connect (OSTI)

This project has been oriented toward improving the vertical integration of the sequential steps associated with the large-scale analysis of human DNA. The central focus has been on an approach to the preparation of {open_quotes}sequence-ready{close_quotes} maps, which is referred to as multiple-complete-digest (MCD) mapping, primarily directed at cosmid clones. MCD mapping relies on simple experimental steps, supported by advanced image-analysis and map-assembly software, to produce extremely accurate restriction-site and clone-overlap maps. We believe that MCD mapping is one of the few high-resolution mapping systems that has the potential for high-level automation. Successful automation of this process would be a landmark event in genome analysis. Once other higher organisms, paving the way for cost-effective sequencing of these genomes. Critically, MCD mapping has the potential to provide built-in quality control for sequencing accuracy and to make possible a highly integrated end product even if there are large numbers of discontinuities in the actual sequence.

Olson, M.

1997-10-01T23:59:59.000Z

398

Plastic heliostat and heliostat enclosure analysis. Final report  

SciTech Connect (OSTI)

The conceptual design and cost analysis report of an enclosed plastic heliostat for a 50-MW/sub e/ central receiver solar thermal electric power plant are presented. The purpose of the study was to analyze the most recent design of the Boeing enclosed plastic heliostat for cost and compare results with a reference second generation glass heliostat case provided by Sandia National Laboratories, Livermore (SNLL). In addition, sensitivities of busbar energy costs to variations in capital cost (installed cost), operation and maintenance cost and overall reflectivity were evaluated.

Berry, M.J.

1984-12-01T23:59:59.000Z

399

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

October 2, 2003 October 2, 2003 EA-0307-SA-01: Supplement Analysis Colville Resident Trout Hatchery Project Supplement Analysis August 27, 2003 EIS-0246-SA-35: Supplement Analysis Wildlife Mitigation Program, seven miles east of Juntura, Oregon, Malheur County August 22, 2003 EIS-0246-SA-34: Supplement Analysis Wildlife Mitigation Program, Flathead County, Montana July 14, 2003 EIS-1069-SA-07: Supplement Analysis Yakima/Kilickitat Fisheries Project, Noxious Weed Control at Cle Elum and Jack Creek, Cle Elum Supplementation and Research Facility and Jack Creek Acclimation Site, Kittitas County, Washington May 21, 2003 EIS-0246-SA-33: Supplement Analysis Wildlife Mitigation Program, Flathead County, Montana May 20, 2003 EIS-0246-SA-32: Supplement Analysis Wildlife Mitigation Program

400

Microsoft Word - Final SA-Nov 2012 Camera Ready.doc  

Broader source: Energy.gov (indexed) [DOE]

5-SA-05 5-SA-05 November 2012 FINAL SUPPLEMENT ANALYSIS FOR THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONTINUED OPERATION OF THE PANTEX PLANT AND ASSOCIATED STORAGE OF NUCLEAR WEAPON COMPONENTS U.S. Department of Energy National Nuclear Security Administration NNSA Production Office DOE/EIS-0225-SA-05 November 2012 FINAL SUPPLEMENT ANALYSIS FOR THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONTINUED OPERATION OF THE PANTEX PLANT AND ASSOCIATED STORAGE OF NUCLEAR WEAPON COMPONENTS U.S. Department of Energy National Nuclear Security Administration NNSA Production Office Contents DOE/EIS-0225-SA-05 iii November 2012 CONTENTS Section Page Acronyms and Abbreviations ...................................................................................................................... vi

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Aerosol analysis for the regional air pollution study. Final report  

SciTech Connect (OSTI)

The design and operation of an aerosol sampling and analysis program implemented during the 1975 to 1977 St. Louis Regional Air Pollution Study is described. A network of ten samplers were operated at selected sites in the St. Louis area and the total mass and elemental composition of the collected particulates were determined. Sampling periods of 2 to 24 hours were employed. The samplers were capable of collecting aerosol particles in two distinct size ranges corresponding to fine (< 2.4 ..mu..m diameter) and coarse (> 2.4 ..mu..m diameter) particles. This unique feature allowed the separation of the particulate samples into two distinct fractions with differing chemical origins and health effects. The analysis methods were also newly developed for use in the St. Louis RAPS study. Total particulate mass was measured by a beta-particle attenuation method in which a precision of +- 5 ..mu..m/cm/sup 2/ could be obtained in a one minute measurement time. Elemental compositions of the samples were determined using an energy dispersive x-ray fluorescence method in which detectable limits of 5 ng/cm/sup 2/ or less were routinely achieved for elements ranging in atomic number from Al to Pb. The advantages of these analytical methods over more conventional techniques arise from the ability to automate the measurements. During the course of the two year study, a total of more than 35,000 individual samples were processed and a total of 28 concentrations measured for each sample.

Jaklevic, J.M.; Gatti, R.C.; Goulding, F.S.; Loo, B.W.; Thompson, A.C.

1980-05-01T23:59:59.000Z

402

DOE/EIS-0265-SA-169: Supplement Analysis for the Watershed Management Program EIS --Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing (08/11/04)  

Broader source: Energy.gov (indexed) [DOE]

Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-169) Mickey Carter Fish and Wildlife Project Manager - KEWU-4 Proposed Action: Idaho Model Watershed Habitat Projects - Pahsimeroi Fence Crossing Project No: 1994-017-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 2.1 Maintain Healthy Riparian Plant Communities, 2.15 Acquisition of Sensitive Riparian Resources, 6.10 Access Fencing Location: Lemhi County, Idaho Proposed by: Bonneville Power Administration (BPA) and the Custer Soil and Water Conservation District Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the installation of a fenced stream crossing over the Pahsimeroi River to enhance a livestock riparian exclosure.

403

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Adobe Acrobat Reader Logo Adobe Acrobat Reader is required for PDF format. Adobe Acrobat Reader Logo Adobe Acrobat Reader is required for PDF format. MS Excel Viewer Spreadsheets are provided in excel Errata - August 25, 2004 1 to117 - Complete set of of Supplemental Tables PDF Table 1. Energy Consumption by Source and Sector (New England) XLS PDF Table 2. Energy Consumption by Source and Sector (Middle Atlantic) XLS PDF Table 3. Energy Consumption by Source and Sector (East North Central) XLS PDF Table 4. Energy Consumption by Source and Sector (West North Central) XLS PDF Table 5. Energy Consumption by Source and Sector (South Atlantic) XLS PDF Table 6. Energy Consumption by Source and Sector (East South Central) XLS PDF Table 7. Energy Consumption by Source and Sector (West South Central) XLS PDF Table 8. Energy Consumption by Source and Sector (Mountain)

404

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

5 5 Adobe Acrobat Reader Logo Adobe Acrobat Reader is required for PDF format Excel logo Spreadsheets are provided in excel 1 to117 - Complete set of Supplemental Tables PDF Energy Consumption by Sector (Census Division) Table 1. New England XLS PDF Table 2. Middle Atlantic XLS PDF Table 3. East North Central XLS PDF Table 4. West North Central XLS PDF Table 5. South Atlantic XLS PDF Table 6. East South Central XLS PDF Table 7. West South Central XLS PDF Table 8. Mountain XLS PDF Table 9. Pacific XLS PDF Table 10. Total United States XLS PDF Energy Prices by Sector (Census Division) Table 11. New England XLS PDF Table 12. Middle Atlantic XLS PDF Table 13. East North Central XLS PDF Table 14. West North Central XLS PDF Table 15. South Atlantic XLS PDF Table 16. East South Central

405

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Annual Energy Outlook 1999 Annual Energy Outlook 1999 bullet1.gif (843 bytes) Assumptions to the AEO99 bullet1.gif (843 bytes) NEMS Conference bullet1.gif (843 bytes) Contacts bullet1.gif (843 bytes) To Forecasting Home Page bullet1.gif (843 bytes) EIA Homepage supplemental.gif (7420 bytes) (Errata as of 9/13/99) The AEO Supplementary tables were generated for the reference case of the Annual Energy Outlook 1999 (AEO99) using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets for 1997 to 2020. Most of the tables were not published in the AEO99, but contain regional and other more detailed projections underlying the AEO99 projections. The files containing these tables are in spreadsheet format. A total of ninety-five tables are presented.

406

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

December 22, 2000 (Next Release: December, 2001) Related Links Annual Energy Outlook 2001 Assumptions to the AEO2001 NEMS Conference Contacts Forecast Homepage EIA Homepage AEO Supplement Reference Case Forecast (1999-2020) (HTML) Table 1. Energy Consumption by Source and Sector (New England) Table 2. Energy Consumption by Source and Sector (Middle Atlantic) Table 3. Energy Consumption by Source and Sector (East North Central) Table 4. Energy Consumption by Source and Sector (West North Central) Table 5. Energy Consumption by Source and Sector (South Atlantic) Table 6. Energy Consumption by Source and Sector (East South Central) Table 7. Energy Consumption by Source and Sector (West South Central) Table 8. Energy Consumption by Source and Sector (Mountain)

407

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

Homepage Homepage Supplement Tables to the AEO2001 The AEO Supplementary tables were generated for the reference case of the Annual Energy Outlook 2001 (AEO2001) using the National Energy Modeling System, a computer-based model which produces annual projections of energy markets for 1999 to 2020. Most of the tables were not published in the AEO2001, but contain regional and other more detailed projections underlying the AEO2001 projections. The files containing these tables are in spreadsheet format. A total of ninety-five tables is presented. The data for tables 10 and 20 match those published in AEO2001 Appendix tables A2 and A3, respectively. Forecasts for 1999 and 2000 may differ slightly from values published in the Short Term Energy Outlook, which are the official EIA short-term forecasts and are based on more current information than the AEO.

408

Final Environmental Assessment/ Regulatory Impact Review/ Initial Regulatory Flexibility Analysis for Amendment 93 to the Fishery  

E-Print Network [OSTI]

Final Environmental Assessment/ Regulatory Impact Review/ Initial Regulatory Flexibility Analysis Review/Initial Regulatory Flexibility Analysis analyzing proposed management measures that would apply for Amendment 93 to the Fishery Management Plan for Groundfish of the Gulf of Alaska Chinook Salmon Prohibited

409

(DOE/EIS-0285/SA-04): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/27/01  

Broader source: Energy.gov (indexed) [DOE]

March 27, 2001 March 27, 2001 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-04) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Ponderosa - Pilot Butte 18/2 to 18/4 Relocation Location: The project area is in the City of Bend, OR, in Deschutes County. Proposed by: Bonneville Power Administration Description of the Proposed Action: BPA proposes to clear unwanted vegetation from a section of BPA's Ponderosa - Pilot Butte Transmission Line Right-of-way to facilitate relocation of structure 18/3. Work would begin in mid-March and end in April, 2001. Analysis: 1. Description of right-of-way and vegetation management needed: The project involves

410

(DOE/EIS-0285/SA-75): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (06/21/02)  

Broader source: Energy.gov (indexed) [DOE]

June June 21, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA- 75-Ross-Lexington. Jim Jellison -- - TFO/Olympia Ed Tompkins -- - TFO/Ross Proposed Action: Vegetation Management for the Ross Lexington Transmission Line. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove danger trees as well as unwanted vegetation in the rights-of-ways, along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: Please see the attached checklist for the resources present. Applicable findings and mitigation measures are discussed below. Planning Steps: 1. Identify facility and

411

(DOE/EIS-0285/SA-103): Supplemental Analysis for Transmission System Vegetation Management Program FEIS (August 12, 2002)  

Broader source: Energy.gov (indexed) [DOE]

2, 2, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-103-Keeler-Pennwalt). Jim Jellison - TFO/Olympia Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for the Keeler-Pennwalt transmission line and parts of the St. John-Keeler, Rivergate-Keeler, Keeler-Oregon City, & St. John-St. Helens lines. Location: Washington and Multnomah Counties, Oregon Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. See Section 1.4 of the attached checklist for a complete description of the proposed action. Analysis: See the attached checklist for the

412

(DOE/EIS-0183-SA-05): Supplement Analysis for the Boise River Diversion Dam Powerplant Rehabilitation, 10/17/02  

Broader source: Energy.gov (indexed) [DOE]

October 17, 2002 October 17, 2002 REPLY TO ATTN OF: KECP-4 SUBJECT: Supplement Analysis for the Boise River Diversion Dam Powerplant Rehabilitation, DOE/EIS-0183-SA-05 memorandum Mark A. Jones Program Analyst - PGF-6 TO : Proposed Action: Boise River Diversion Dam - Amendment to Capital Investment Sub-Agreement, Contract Number DE-MS79-94BP94618 Proposed By: Bonneville Power Administration (BPA) and Bureau of Reclamation (Reclamation) Location: Near Boise, in Ada County, Idaho Description of the Proposed Action: BPA proposes to fund Reclamation's rehabilitation of the powerplant at the existing Boise River Diversion Dam (Diversion Dam) to use the water resource at Diversion Dam for electrical power production. Analysis: The Diversion Dam is located about 7 miles southeast of Boise, Idaho on the Boise River, about

413

Caucasus Seismic Information Network: Data and Analysis Final Report  

SciTech Connect (OSTI)

The geology and tectonics of the Caucasus region (Armenia, Azerbaijan, and Georgia) are highly variable. Consequently, generating a structural model and characterizing seismic wave propagation in the region require data from local seismic networks. As of eight years ago, there was only one broadband digital station operating in the region an IRIS station at Garni, Armenia and few analog stations. The Caucasus Seismic Information Network (CauSIN) project is part of a nulti-national effort to build a knowledge base of seismicity and tectonics in the region. During this project, three major tasks were completed: 1) collection of seismic data, both in event catalogus and phase arrival time picks; 2) development of a 3-D P-wave velocity model of the region obtained through crustal tomography; 3) advances in geological and tectonic models of the region. The first two tasks are interrelated. A large suite of historical and recent seismic data were collected for the Caucasus. These data were mainly analog prior to 2000, and more recently, in Georgia and Azerbaijan, the data are digital. Based on the most reliable data from regional networks, a crustal model was developed using 3-D tomographic inversion. The results of the inversion are presented, and the supporting seismic data are reported. The third task was carried out on several fronts. Geologically, the goal of obtaining an integrated geological map of the Caucasus on a scale of 1:500,000 was initiated. The map for Georgia has been completed. This map serves as a guide for the final incorporation of the data from Armenia and Azerbaijan. Description of the geological units across borders has been worked out and formation boundaries across borders have been agreed upon. Currently, Armenia and Azerbaijan are working with scientists in Georgia to complete this task. The successful integration of the geologic data also required addressing and mapping active faults throughout the greater Caucasus. Each of the major faults in the region were identified and the probability of motion were assessed. Using field data and seismicity, the relative activity on each of these faults was determined. Furthermore, the sense of motion along the faults was refined using GPS, fault plane solutions, and detailed field studies. During the course of the integration of the active fault data, the existence of the proposed strike slip Borjomi-Kazbeki fault was brought into question. Although it had been incorporated in many active tectonic models over the past decade, field geologists and geophysicists in Georgia questioned its existence. Detailed field studies were carried out to determine the existence of the fault and estimate the slip along it; and it was found that the fault zone did not exist. Therefore, the convergence rate in the greater Caucasus must be reinterpreted in terms of thrust mechanisms, instead of strike-slip on the Borjomi-Kazbeki fault zone.

Randolph Martin; Mary Krasovec; Spring Romer; Timothy O'Connor; Emanuel G. Bombolakis; Youshun Sun; Nafi Toksoz

2007-02-22T23:59:59.000Z

414

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Broader source: Energy.gov (indexed) [DOE]

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

415

Supplement to the ``determination analysis`` (ORNL-6847) and analysis of the NEMA efficiency standard for distribution transformers  

SciTech Connect (OSTI)

This report contains additional information for use by the US Department of Energy in making a determination on proposing energy conservation standards for distribution transformers as required by the Energy Policy Act of 1992. An earlier determination study by the Oak Ridge National Laboratory determined that cost-effective, technically feasible energy savings could be achieved by distribution transformer standards and that these savings are significant relative to other product conservation standards. This study was documented in a final report, ``Determination Analysis of Energy Conservation Standards for Distribution Transformers`` (ORNL-6847, July 1996). The energy conservation options analyzed in this study were estimated to save 5.2 to 13.7 quads from 2000--2030. The energy savings for the determination study cases have been revised downward for a number of reasons. The transformer market, both present and future, was overestimated in the previous study, particularly for dry-type transformers, which have the greatest energy-saving potential. Moreover, a revision downwards of the effective annual loads for utility owned transformers also results in lower energy savings. The present study assesses four of the five conservation cases from the earlier determination study as well as the National Electrical Manufacturers Association energy efficiency standard NEMA TP 1-1996 using the updated data and a more accurate disaggregated analysis model. According to these new estimates, the savings ranged from 2.5 to 10.7 quads of primary energy for the 30-year period 2004 to 2034. For the TP-1 case, data were available to calculate the payback period required to recover the extra cost from the value of the energy saved. The average payback period based on the average national cost of electricity is 2.76 years. 15 figs., 23 tabs.

Barnes, P.R.; Das, S.; McConnell, B.W.; Van Dyke, J.W.

1997-09-01T23:59:59.000Z

416

(DOE/EIS-0285/SA-36): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (01/22/02)  

Broader source: Energy.gov (indexed) [DOE]

24, 2002 24, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-38) Benjamin J. Tilley - TFE/Alvey Proposed Action: Vegetation Management along the Wendson-Tahkenith #1 & #2 1/1-20/4, Tahkenitch-Gardiner #1/1-2/3 and Tahkenitch-Reedsport #1/1-4/2 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 100 feet. Location: The ROW is located in Douglas and Lane County, OR, being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

417

(DOE/EIS-0285/SA-43): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/27/02  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-43) William T. Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management along the Lower Monumental - McNary 57/2 to 63/5, and Radar Tap 0/4 to 0/10 Transmission Line ROW's. The proposed work will be accomplished in the indicated sections of the transmission line corridor with and average corridor width of 165 and 80 feet respectively. Location: The ROW is located in Umatilla and Franklin County, OR, being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

418

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap  

Broader source: Energy.gov (indexed) [DOE]

5, 2003 5, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 150 East Ellensburg Tap Tom Murphy Natural Resource Specialist - TFS/Bell-1 Proposed Action: Vegetation Management for the East Ellensburg Tap, 1/6 to 3/19 Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line with no easement width. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Kittatas County, WA being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to clear unwanted vegetation in the rights-of-ways and around transmission line structures that may impede the operation and maintenance of the

419

(DOE/EIS-0285/SA-120): Supplement Analysis for the Transmission System Vegetation Management Program FEISq 2/10/03  

Broader source: Energy.gov (indexed) [DOE]

0, 2003 0, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-120 Hanford-Ostrander Corridor Maintenance William Erickson TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management for the Hanford-Ostrander Transmission Line Corridor from Tower 10/4 to Tower 17/2 + 770. The line is a 500kV Single Circuit Transmission Line having an easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced on the attached checklist. Location: The subject right-of-way is located in Benton County, WA. In the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

420

(DOE/EIS-0285/SA-119): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/29/03  

Broader source: Energy.gov (indexed) [DOE]

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

(DOE/EIS-0285/SA-06): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/13/01  

Broader source: Energy.gov (indexed) [DOE]

4/13/01 4/13/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-06) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management of annual weeds on seven acres of Bonneville Power Administration (BPA) owned pastureland at the Walla Walla Substation. Location: The pastureland is adjacent to the Walla Walla Substation and is located east and north of the fenced substation, all within the BPA property boundary. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to apply selected herbicides to control annual weeds that are competing with native grasses that were seeded two years ago. Herbicides will also

422

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28)(9/5/01)  

Broader source: Energy.gov (indexed) [DOE]

September 5, 2001 September 5, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-28) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Port Angeles - Sappo No.1 Transmission Line ROW, from struture 1/1 to structure 42/10. Location: The ROW is located in Clallum County, WA, all in the Olympia Region. Proposed by: Bonneville Power Administration (BPA), Olympia Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

423

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25)(9/5/01)  

Broader source: Energy.gov (indexed) [DOE]

5, 2001 5, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-25) Elizabeth Johnson - TFR/The Dalles Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along selected ROW sections of the Ostrander-Pearl transmission line. The ROWs include sections of the Ostrander-Pearl 500 kV line; the Ostrander-McLoughlin 500 kV line; the Big Eddy-Chemawa 230 kV line and the Big Eddy- McLoughlin 230 kV line. Location: The ROW is located in Clackamas County, Oregon, within the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights- of-way and around tower structures that may impede the operation and maintenance of the

424

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-30)(10/28/02)  

Broader source: Energy.gov (indexed) [DOE]

0) 0) Allyn Meuleman TO: Fish and Wildlife Project Manager Proposed Action: Horkley Property Fee Simple Acquisition Project No: 1995-057-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition and Transfer Location: Jefferson County, Idaho Proposed by: Bonneville Power Administration (BPA), the U.S. Bureau of Land Management (BLM), and Idaho Department of Fish and Game (IDFG). Description of the Proposed Action: BPA proposes to fund the acquisition of approximately 120 acres of sagebrush steppe and agricultural lands in Jefferson County, Idaho. The property proposed for acquisition lies on the west slope of the Menan Butte Area of Critical

425

(DOE/EIS-0265/SA-92): Supplement Analysis for the Watershed Management Program EIS 10/16/02  

Broader source: Energy.gov (indexed) [DOE]

2) 2) Dorothy Welch, KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Asotin Creek Six-Year Direct Seed Program Project No: 1999-060-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 3.2 Conservation Copping Sequence, 3.3 Conservation Tillage, 3.8 Delayed Seed Bed Preparation, 3.9 Grasses and Legumes in rotation, 3.26 Evaluate Field Limitations, 3.27 Equipment Calibration and Use. Location: Various locations in the Asotin Creek Watershed, WA. Proposed by: Bonneville Power Administration (BPA) and Asotin County Conservation District (ACCD). Description of the Proposed Action: BPA proposes to fund a no-till/direct seed farming

426

Supplement Analysis for the Wildlife Mitigation Program EIS (DOE/EIS-0246/SA-31)(10/28/02)  

Broader source: Energy.gov (indexed) [DOE]

1) 1) Allyn Meuleman TO: Fish and Wildlife Project Manager Proposed Action: Allen Property Fee Simple Acquisition Project No: 1995-057-00 Wildlife Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Wildlife Mitigation Program EIS): 1.1 Fee-Title Acquisition and Transfer Location: Jefferson County, Idaho Proposed by: Bonneville Power Administration (BPA), the U.S. Bureau of Land Management (BLM), and Idaho Department of Fish and Game (IDFG). Description of the Proposed Action: BPA proposes to fund the acquisition of approximately 81 acres of forested wetlands and scrub shrub wetlands along the south bank of the South Fork of the Snake River in Jefferson County, Idaho. The property proposed for acquisition lies within

427

(DOE/EIS-0285/SA-122): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

CSB-2 CSB-2 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-122- Bonneville-Alcoa Ed Tompkins, TFO/LMT Proposed Action: Vegetation Management for the Bonneville-Alcoa 115kV transmission line Location: The project is located in the BPA Olympia Region in Skamania and Clark Counties, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans

428

Supplement Analysis of Site-Specific and Programmatic Environmental Impact Statements: Operational and Engineering Modifications, Regulatory Review, and Socioeconomic Variation  

Broader source: Energy.gov (indexed) [DOE]

DISCLAIMER DISCLAIMER This document has been approved for distribution to the public. All information classified by the Department of Energy Strategic Petroleum Reserve as Sensitive Unclassified Information has been removed from this document. DOE/SPR/EIS-0075-SA01 SUPPLEMENT ANALYSIS OF SITE-SPECIFIC AND PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENTS: OPERATIONAL AND ENGINEERING MODIFICATIONS, REGULATORY REVIEW, AND SOCIOECONOMIC VARIATION U.S. Department of Energy Strategic Petroleum Reserve 900 Commerce Road East New Orleans, Louisiana 70123 March 2004 Prepared for the U. S. Department of Energy Strategic Petroleum Reserve Project Management Office under Contract No. DE-AC96-93PO92207 DynMcDermott Petroleum Operations Company 850 South Clearview Parkway

429

DOE/EIS-0285-SA-50: Supplement Analysis for the Transmission Vegetation Management Program FEIS (3/15/02)  

Broader source: Energy.gov (indexed) [DOE]

2/27/01 1 2/27/01 1 United States Government Department of Energy Bonneville Power Administration DATE: March 15, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-50) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Grizzly-Summerlake (Structures 102/1-104/2) and Grizzly-Captain Jack (Structures 103/1-140/4) Transmission Line Corridors. Location: The project area lies east and northeast Klamath Falls, OR, and is located in Lake and Klamath Counties, Redmond Region. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the rights of

430

(DOE/EIS-0285/SA=32): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (11/15/01)  

Broader source: Energy.gov (indexed) [DOE]

November 15, 2001 November 15, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-32) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Re-vegetation Plot Study along the Lower Monumental-McNary Transmission Line ROW. The study area sections are located near structures 38/4 and 39/3. The line is a 500kV Single Circuit Transmission Line having an easement width of 165 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor as indicated on the attached checklist. Location: The ROW is located in Walla Walla County, WA being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA).

431

Supplement Analysis for Yakima/Klickitat Fisheries Project, (DOE/EIS-0169-SA-05) 9/20/02  

Broader source: Energy.gov (indexed) [DOE]

September 20, 2002 September 20, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for Yakima/Klickitat Fisheries Project, (DOE/EIS-0169-SA-05) memorandum David Byrnes Project Manager - KEWL-4 TO: Proposed Action: Yakima/Klickitat Fisheries Project - Under the Monitoring and Evaluation Program (M&E), the domestication selection research task would be modified to include a hatchery control line, maintained entirely by spawning hatchery-origin fish. Project No.: F3204 Location: Cle Elum, Kittitas County, Washington. Proposed by: Bonneville Power Administration (BPA) and Co-Managed by the Yakama Nation (YN) and the Washington Department of Fish and Wildlife (WDFW). 1. Introduction The Bonneville Power Administration is funding ongoing studies, research, and artificial production of

432

(DOE/EIS-0285/SA-127): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

KEP/4 KEP/4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-127- Eugene-Alvey#2 Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Eugene-Alvey 115 kV transmission line from structure 7/1 through structure 12/2m, and along portions of the following adjacent transmission lines: Hawkins-Alvey 115KV and Alvey-Lane 115KV. Location: The project is located in the BPA Eugene Region in Lane County, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to

433

(DOE/EIS-0285/SA-52): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (03/22/02)  

Broader source: Energy.gov (indexed) [DOE]

22, 2002 22, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-52) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the Ashe-Marion #2 (138/1-150/2), Buckley- Marion (12/1-24/2), McNary-Santiam (109/1-119/3), and John Day-Marion (49/4-50/5) Transmission Line Corridors. Location: The project area lies between Maupin and Pine Grove Oregon, and is in the Redmond Region. The project area begins at on the Ashe-Marion at structure 138/1 and terminates at Wapinitia Road, Pine Grove. Proposed by: Bonneville Power Administration. Description of the Proposed Action: BPA proposes to clear unwanted vegetation from the

434

(DOE/EIS-0285/SA-57): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/10/02  

Broader source: Energy.gov (indexed) [DOE]

0, 2002 0, 2002 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-57) Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Trojan-Allston Transmission Lines 1 & 2 ROW between 1/1 and 9/1. The lines are 230 kV Single Circuit Transmission Lines having an easement width of 125 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

435

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20)(8/2/01)  

Broader source: Energy.gov (indexed) [DOE]

2, 2001 2, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-20) Bill Erickson - TFP/Walla Walla - Natural Resource Specialist Jim Jellison - TFO/Olympia - Natural Resource Specialist Proposed Action: Vegetation Management along the McNary-Ross 161/1 to 166/5+346 Transmission Line ROW. The line is a 345kV Single Circuit Transmission Line having an easement width of 175 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Clark County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

436

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

437

DOE/EIS-0285-SA-62: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (4/16/02)  

Broader source: Energy.gov (indexed) [DOE]

DATE April 16, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-62) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Rocky Reach - Maple Valley No. 1 Transmission Line ROW from structure 98/2 to structure 110/1. The transmission line is a 500 kV line. Location: The ROW is located King County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear targeted vegetation along access roads and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation management along existing access road and

438

(DOE/EIS-0285-126): Supplement Analysis for the Transmission System Vegetation Management Program 2/19/03  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-126- Alvey Fairview Benjamin Tilley - TFE/Alvey Proposed Action: Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7. Location: The project is located in the BPA Eugene Region in Coos, Douglas, and Lane Counties, Oregon. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, along access roads and around tower structures along the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

439

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285-SA-33)(11/27/01)  

Broader source: Energy.gov (indexed) [DOE]

November 27, 2001 November 27, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA-33) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the St Helens-Allston Transmission Line ROW. The line is a 115 kV Single Circuit Transmission Line having an easement width of 100 feet. Location: The ROW is located in Columbia County, OR, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line right-of-way that are approaching electrical clearance zones in accordance

440

(DOE/EIS-0285/SA-105): Supplement Analysis for the Transmission System Vegetation Management Program FEIS (08/22/02)  

Broader source: Energy.gov (indexed) [DOE]

2, 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 105 Elbe Tap to Alder-LaGrande No. 1 James Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elbe Tap to Alder-LaGrande No.1 and 115kV transmission line from structure 1/1 through structure 7/17. Corridor width varies. The project area is located within Whatcom County, Washington. Location: Transmission line is located at and west of Elbe, Pierce County Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

(DOE/EIS-0285/SA-37): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/17/03  

Broader source: Energy.gov (indexed) [DOE]

17, 2002 17, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-37) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Monroe-Custer No.1 Transmission Line ROW from 29/1+915 to 45/4+975. The transmission line is 500 kV single circuit transmission line. Project includes adjacent Monroe-Custer No.2 and Arlington-Bellingham single circuit transmission lines having a combined ROW width of 421.5 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Snohomish and Skagit Counties, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA).

442

(DOE/EIS-0285-SA-100): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 8/15/02  

Broader source: Energy.gov (indexed) [DOE]

5, 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-100) Joe Johnson Natural Resource Specialist TFS/Kalispell Proposed Action: Vegetation Management along the Libby-Conkelly, 1/2 to 26/4 Transmission Line ROW. The line is a 230kV Double Circuit Transmission Line having an easement width of 125 feet to 250 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in both Lincoln and Flathead County, MT, being in the Spokane Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be in

443

(DOE/EIS-0285/SA-56): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/9/02  

Broader source: Energy.gov (indexed) [DOE]

09, 2002 09, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-56) 2ULRQ $OEUR 2O\PSLD 5HJLRQDO 0DQDJHU Proposed Action: Vegetation Management for the following electric yards located in the Ross District: Cape Horn North Bonneville Stevenson Carson Underwood Troutdale Cascade Locks Acton Ross 345kV and J.D. Alcoa Sifton St. Johns Ostrander McLoughlin Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to maintain a weed-free environment in the electrical substations located within the Olympia Region's Ross District. Description of the Proposal: BPA proposes to manage vegetation inside and around electrical

444

(DOE/EIS-0285/SA-59): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/19/02  

Broader source: Energy.gov (indexed) [DOE]

April 19, 2002 April 19, 2002 REPLY TO ATTN OF: KEP SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-59) James Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation Management along the Chehalis Covington/ Raver Paul / Paul Alston 230 and 500 kV Transmission line Corridor ROW 48/2 to 70/6 and 1/1 to 13/4. The proposed work will be accomplished in the indicated sections of the transmission line corridor with a corridor width of 250 to 442 feet. Location: The ROW is located in Thurston County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways

445

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-58) 5/31/02  

Broader source: Energy.gov (indexed) [DOE]

31, 2002 31, 2002 REPLY TO ATTN OF: KEPR-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-58) Bill Erickson - TPF/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management at the Lines Creek Microwave site. The proposed work will be accomplished within the fenced area of the facility. Location: The Lines Creek Microwave site is located at SWSW Section 33 T44N R2E within Shoshone County, Idaho, Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes bare ground vegetation management at the microwave site. Bare ground management is needed to prevent fire damage and maintain a vegetation free environment on the site.

446

(DOE/EIS-0265/SA-03): Supplement Analysis for the Watershed Management Program EIS 10/16/02  

Broader source: Energy.gov (indexed) [DOE]

3) 3) Dorothy Welch, KEWU-4 TO: Fish and Wildlife Project Manager Proposed Action: Couse/Tenmile Creeks Six-Year Direct Seed Program Project No: 2002-050-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 3.2 Conservation Cropping Sequence, 3.3 Conservation Tillage, 3.8 Delayed Seed Bed Preparation, 3.9 Grasses and Legumes in Rotation, 3.26 Evaluate Field Limitations, 3.27 Equipment Calibration and Use Location: Various properties in Anatone, Asotin County, Washington Proposed by: Bonneville Power Administration (BPA) and The Asotin County Conservation District (ACCD). Description of the Proposed Action: BPA proposes to fund a six-year direct seed program

447

(DOE/EIS-0285/SA-02): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 3/9/01  

Broader source: Energy.gov (indexed) [DOE]

3/09/01 3/09/01 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-02) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Danger tree clearing on nine ROWs. Locations are: the Franklin-Badger Canyon #2; Hedges Tap; White Bluffs-Richland; Grandview-Richland; Badger Canyon-Richland; Franklin- Riverview; Taylor Flats Tap; Walla Walla-Pendleton; and McNary-Slatt Transmission lines. Location: All ROWs are located in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear danger trees from varying widths of the indicated transmission line rights-of way that are approaching electrical clearance zones in

448

(DOE/EIS-0265/SA-95): Supplement Analysis for the Watershed Management Program EIS 10/21/02  

Broader source: Energy.gov (indexed) [DOE]

21, 2002 21, 2002 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-95) Ron Morinaka (KEWU - 4) TO: Fish and Wildlife Project Manager, COTR Proposed Action: Libby Creek Channel Stabilization Project Project No: 199500400 Watershed Management Program (See App. A : Available Management Techniques): 1.6 Install Large Woody Debris Structures; 1.7 Install Other Habitat Complexity Structures; 1.9 Structural Bank Protection using Bioengineering Methods; 1.16 Spawning Habitat Enhancements; 1.17 Rearing Habitat Enhancements; 2.1 Maintain Healthy Riparian Plant Communities. Location: On Libby Creek, located about 18 miles southwest of the town of Libby, Montana

449

(DOE/EIS-0285/SA-64): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/26/02  

Broader source: Energy.gov (indexed) [DOE]

6, 2002 6, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-64) Truman Conn - TFP Regional Manager, Walla Walla Region Proposed Action: Vegetation Management for Substations and Non-Electric Facilities in the Walla Walla Region (See Attachment A for a complete list of facilities) Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to manage vegetation inside and around electrical substations and associated facilities. Vegetation management within the substation shall include the bare ground management of all graveled areas. These areas shall primarily be maintained with the use of herbicides. The management of vegetation outside the substation and associated facilities

450

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22)(8/17/01)  

Broader source: Energy.gov (indexed) [DOE]

August 17, 2001 August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-22) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Chief Joseph - Snohomish No.3 and 4 Transmission Line ROW. From STR 94/1 to STR 113/1 Location: The ROW is located in King and Snohomish Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is

451

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23)(8/17/01)  

Broader source: Energy.gov (indexed) [DOE]

DATE: August 17, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-23) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along the Schultz - Raver No.1 and 2 from 60/3 to 75/5 and the Olympia - Grand Coulee from 70/2 to 70/5 Transmission Line ROW's. Location: The ROW is located in King County, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways, around tower structures, and along access roads that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety

452

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26)(9/11/01)  

Broader source: Energy.gov (indexed) [DOE]

11, 2001 11, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-26) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management on Reedsport-Fairview #1 Transmission Line Structure 1/5 to 39/4. Location: All ROW are located in Coos and Douglas Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently

453

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) (12/3/01)  

Broader source: Energy.gov (indexed) [DOE]

3, 2001 3, 2001 REPLY TO ATTN OF: KEP/Z992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-34) Bill Erickson - TFP/Walla Walla Jim Jellison - TFO/Olympia Proposed Action: Vegetation Management along the McNary-Ross Transmission Line ROW between 152/3+2120 to 153/4. The line is 345 kV Single Circuit Transmission Line (project includes adjacent N. Bonneville-Ross 230 kV Single Circuit Transmission Line) having a combined easement width of 300 feet. The proposed work will be accomplished in the indicated sections of the transmission line corridor. Location: The ROW is located in Skamania County, WA, being in the Olympia Region. Proposed by: Bonneville Power Administration (BPA).

454

(DOE/EIS-0285/SA-15): Supplement Analysis for the Transmission System Vegetation Manaement Program FEIS 6/19/01  

Broader source: Energy.gov (indexed) [DOE]

United States Government Department of Energy Bonneville Power Administration DATE: June 19, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15) Jim Jellison - TFO/Olympia Natural Resource Specialist Proposed Action: Vegetation management on selected sections of ROWs in the Ross-St. John and Ross-Carborundum transmission line ROWs. The ROWs include sections of the Ross-St. John 230Kv line; the Ross-Rivergate 230Kv line; the Ross-Alcoa 115Kv line; the Ross-Carborundum 115Kv line and the Clark PUD 115Kv line. Location: The ROWs span sections of Vancouver Washington and Portland Oregon and are all

455

(DOE/EIS-0285/SA-07): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/18/01  

Broader source: Energy.gov (indexed) [DOE]

18, 2001 18, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-07) Bill Erickson - TFP/Walla Walla Natural Resource Specialist Proposed Action: Vegetation Management on section of three ROWs. The ROWs include selected sections of the McNary Powerhouse, the present and proposed new sections of the McNary-Roundup and the McNary Switchyard South Transmission lines. Location: All ROW are located east Umatilla, OR., all being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject

456

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17)(7/24/01)  

Broader source: Energy.gov (indexed) [DOE]

DATE: July 24, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-17) Donald F. Atkinson - TFN/Snohomish Natural Resource Specialist Proposed Action: Vegetation Management along selected sections of the Schulz - Raver No.1, 2, 3 & 4, Olymplia - Grand Coulee NO. 1 Transmission Line ROW's. Location: The ROW's are located in Pierce and King Counties, WA, in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. All work will be executed in accordance with the National Electrical Safety Code and BPA

457

(DOE/EIS-0285/SA-123): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 2/20/03  

Broader source: Energy.gov (indexed) [DOE]

20, 2003 20, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-123 Malin-Hilltop Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on Malin-Hilltop (Structures 20/5-29/1). Location: The project area lies to the southeast of Klamath Falls, OR, and is located in Modoc County, California. Proposed by: Bonneville Power Administrationn (BPA) Description of the Proposed Action: Trees are located under and adjacent to conductors. Should a fire occur, these trees are a hazard to the line and could cause serious damage to the conductors, resulting in significant problems for the transmission grid. BPA plans on

458

(DOE/EIS-0285/SA-55): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 4/12/02  

Broader source: Energy.gov (indexed) [DOE]

2, 2002 2, 2002 REPLY TO ATTN OF: KEPR/Covington SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-55) Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Raver - Paul No. 1 Transmission Line ROW from structure 15/5 to 29/3. The transmission line is a 500 kV line. Location: The ROW is located Pierce County, WA. Proposed by: Snohomish Regional Headquarters, Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission line, including both Reclaim and Danger Trees. Also, access road clearing will be

459

(DOE/EIS-0285/SA-27): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 10/22/01  

Broader source: Energy.gov (indexed) [DOE]

October 22, 2001 October 22, 2001 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-27) Ben Tilley - TFE/Alvey Natural Resource Specialist Proposed Action: Vegetation Management along the Marion-Alvey #1 from structure 14/5 to 64/3 and the Marion-Lane #1 from structure 14/5 to 70/2. Both lines describe the same segment of ROW between structures 14/5 and 45/2. Location: All ROW are located in Marion, Linn, and Lane Counties, OR, all being in the Eugene Region. Proposed by: Bonneville Power Administration (BPA), Eugene Region. Description of the Proposed Action: BPA proposes to clear unwanted vegetation in the rights-of- ways, around tower structures, and associated access roads that may impede the operation and

460

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 21, 2002 June 21, 2002 EIS-0285-SA-75: Supplement Analysis Transmission System Vegetation Management Program June 20, 2002 EIS-0170-SA-01: Supplement Analysis System Operation Review EIS, Bonneville Power Administration, and B.C. Hydro and Power Authority, British Columbia, Canada June 19, 2002 EIS-0265-SA-83: Supplement Analysis Watershed Management Program June 11, 2002 EIS-0246-SA-25: Supplement Analysis Wildlife Mitigation Program May 31, 2002 EIS-0285-SA-58: Supplement Analysis Transmission System Vegetation Management Program May 24, 2002 EIS-0183-SA-04: Supplement Analysis Klondike Wind Project - Power Purchase Agreement, Contract Number 02PB-11093 Near Wasco, Sherman County, Oregon May 23, 2002 EIS-0246-SA-24: Supplement Analysis Wildlife Mitigation Program May 21, 2002

Note: This page contains sample records for the topic "final supplement analysis" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 15, 2011 August 15, 2011 EIS-0399-SA-01: Supplement Analysis Montana-Alberta Tie Ltd. 230-kV Transmission Line Project August 4, 2011 EIS-0348-SA-03: Supplement Analysis Continued Operation of Lawrence Livermore National Laboratory August 4, 2011 EIS-0348-SA-03: Supplement Analysis Continued Operation of Lawrence Livermore National Laboratory, CA July 12, 2011 EIS-0407-SA-01: Supplement Analysis Abengoa Biorefinery Project, near Hugoton, Stevens County, Kansas July 11, 2011 EIS-0281-SA-01: Supplemental Analysis Reestablishing Long -Term Pulse Mode Testing Capability at the Annular Core Research Reactor, Sandia National Laboratories, New Mexico July 8, 2011 EIS-0240-SA-01: Supplement Analysis Disposition of Surplus Highly Enriched Uranium July 7, 2011 EIS-0200-SA-03: Supplement Analysis

462

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 30, 2001 March 30, 2001 EIS-0285-SA-05: Supplement Analysis Transmission System Vegetation Management Program March 27, 2001 EIS-0285-SA-04: Supplement Analysis Transmission System Vegetation Management Program March 9, 2001 EIS-0285-SA-02: Supplement Analysis Transmission System Vegetation Management Program March 1, 2001 EIS-0189: Supplement Analysis Tank Waste Remediation System December 1, 2000 EIS-0200-SA-01: Supplement Analysis Disposal of Contact-Handled Transuranic Waste at the Waste Isolation Pilot Plant (WIPP) November 1, 2000 EIS-0169-SA-04: Supplement Analysis Yakima Fisheries Project-Construction/modification upgrades to the Prosser Hatchery and the Marion Drain Hatchery Facilities September 20, 2000 EIS-0238-SA-01: Supplement Analysis Continued Operations of Los Alamos National Laboratory

463

Supplement Analyses (SA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 27, 2002 February 27, 2002 EIS-0285-SA-46: Supplement Analysis Transmission System Vegetation Management Program February 27, 2002 EIS-0285-SA-45: Supplement Analysis Transmission System Vegetation Management Program February 27, 2002 EIS-0285-SA-43: Supplement Analysis Transmission System Vegetation Management Program February 20, 2002 EIS-0265-SA-75: Supplement Analysis Watershed Management Program - Gourlay Creek Fish Ladder Project February 19, 2002 EIS-0285-SA-40: Supplement Analysis Transmission System Vegetation Management Program February 15, 2002 EIS-0285-SA-42: Supplement Analysis Transmission System Vegetation Management Program February 5, 2002 EIS-0229-SA-02: Supplement Analysis Storage of Surplus Plutonium Materials in the K-Area Material Storage Facility at The Savannah River Site

464

DOE/EIS-0283-SA1: Supplement Analysis and Amended Record of Decision for Changes Needed To the Surplus Plutonium Disposition Program (4/24/03)  

Broader source: Energy.gov (indexed) [DOE]

3-SA1 3-SA1 April 2003 Changes Needed To The Surplus Plutonium Disposition Program SUPPLEMENT ANALYSIS AND AMENDED RECORD OF DECISION U.S. Department of Energy National Nuclear Security Administration Office of Fissile Materials Disposition Washington, D.C. Table of Contents i Table of Contents List of Figures ................................................................................................................................. ii List of Tables .................................................................................................................................. ii List of Acronyms ...........................................................................................................................

465

Hanford Sludge Treatment Project 105-KW Final Safety Analysis Report Review, August 2011  

Broader source: Energy.gov (indexed) [DOE]

Site Visit Report Site Visit Report Sludge Treatment Project 105-KW Final Safety Analysis Report Review May 2011 August 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Introduction ............................................................................................................................................ 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 1 4.0 Results .................................................................................................................................................... 2

466

Hanford Sludge Treatment Project 105-KW Final Safety Analysis Report Review, August 2011  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Visit Report Site Visit Report Sludge Treatment Project 105-KW Final Safety Analysis Report Review May 2011 August 2011 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Introduction ............................................................................................................................................ 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 1 4.0 Results .................................................................................................................................................... 2

467

TA-55 Final Safety Analysis Report Comparison Document and DOE Safety Evaluation Report Requirements  

SciTech Connect (OSTI)

This document provides an overview of changes to the currently approved TA-55 Final Safety Analysis Report (FSAR) that are included in the upgraded FSAR. The DOE Safety Evaluation Report (SER) requirements that are incorporated into the upgraded FSAR are briefly discussed to provide the starting point in the FSAR with respect to the SER requirements.

Alan Bond

2001-04-01T23:59:59.000Z

468

Final Accepted Version Collision risk-capacity tradeoff analysis of an en-route  

E-Print Network [OSTI]

Final Accepted Version Collision risk-capacity tradeoff analysis of an en-route corridor model YE-route corridor. This paper analyzes the collision risk-capacity tradeoff using combined discrete variables can improve the rate and stability of the corridor with low risks of loss of separation. Keywords

469

Spent nuclear fuel project - criteria document spent nuclear fuel final safety analysis report  

SciTech Connect (OSTI)

The criteria document provides the criteria and planning guidance for developing the Spent Nuclear Fuel (SNF) Final Safety Analysis Report (FSAR). This FSAR will support the US Department of Energy, Richland Operations Office decision to authorize the procurement, installation, installation acceptance testing, startup, and operation of the SNF Project facilities (K Basins, Cold Vacuum Drying Facility, and Canister Storage Building).

MORGAN, R.G.

1999-02-23T23:59:59.000Z

470

Spent fuel sabotage test program, characterization of aerosol dispersal : technical review and analysis supplement.  

SciTech Connect (OSTI)

This project seeks to provide vital data required to assess the consequences of a terrorist attack on a spent fuel transportation cask. One such attack scenario involves the use of conical shaped charges (CSC), which are capable of damaging a spent fuel transportation cask. In the event of such an attack, the amount of radioactivity that may be released as respirable aerosols is not known with great certainty. Research to date has focused on measuring the aerosol release from single short surrogate fuel rodlets subjected to attack by a small CSC device in various aerosol chamber designs. The last series of three experiments tested surrogate fuel rodlets made with depleted uranium oxide ceramic pellets in a specially designed double chamber aerosol containment apparatus. This robust testing apparatus was designed to prevent any radioactive release and allow high level radioactive waste disposal of the entire apparatus following testing of actual spent fuel rodlets as proposed. DOE and Sandia reviews of the project to date identified a number of issues. The purpose of this supplemental report is to address and document the DOE review comments and to resolve the issues identified in the Sandia technical review.

Durbin, Samuel G.; Lindgren, Eric Richard

2009-07-01T23:59:59.000Z

471

DOE/EIS-0236-S1F; National Ignition Facility Final Supplemental Environmental Impact Statement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (January 2001)  

Broader source: Energy.gov (indexed) [DOE]

SUMMARY SUMMARY 1 This Supplemental Environmental Impact Statement (SEIS) was prepared pursuant to a Joint Stipulation and Order approved and entered as an order of the court on October 27, 1997, in partial settlement of the lawsuit Civ. No. 97-936 (SS) (D.D.C.), Natural Resources Defense Council [NRDC] et al. v. Richardson et al. The Joint Stipulation and Order is reproduced at the end of this document as Attachment 1. In the Joint Stipulation and Order, the U.S. Department of Energy (DOE) agreed to prepare an SEIS to the Programmatic Environmental Impact Statement for Stockpile Stewardship and Management (SSM PEIS) (DOE/EIS-0236, DOE 1996a) to evaluate the reasonably foreseeable significant adverse environmental impacts of continuing to construct and of operating the National Ignition Facility (NIF) at Lawrence Livermore National

472

Supplement Analysis for the Programmatic Environmental Impact Statement (PEIS) for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, (DOE/EIS-0310-SA-01) (08/05/04)  

Broader source: Energy.gov (indexed) [DOE]

0-SA-01 0-SA-01 Supplement Analysis for the Programmatic Environmental Impact Statement (PEIS) for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility Introduction and Background The Department of Energy (DOE), pursuant to the National Environmental Policy Act (NEPA), issued the Final PEIS for Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility (Nuclear Infrastructure (NI) PEIS, DOE/EIS-0310) in December 2000. Under the Authority of the Atomic Energy Act of 1954, the DOE's missions include: (1) producing isotopes for research and applications

473

Supplement to the Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive at Yucca Mountain, Nye County, NV (DOE/EIS-0250F) (10/13/06)  

Broader source: Energy.gov (indexed) [DOE]

90 Federal Register 90 Federal Register / Vol. 71, No. 198 / Friday, October 13, 2006 / Notices 1 Coincident with this Notice of Intent, DOE is publishing an Amended Notice of Intent to prepare a Supplemental Yucca Mountain Rail Corridor and Rail Alignment EIS (DOE/EIS-0250F-S2 and DOE/ EIS-0369). That EIS will review the rail corridor analyses of the Yucca Mountain Final EIS, and update, as appropriate, and will analyze the proposed Mina corridor; it also will include detailed analyses of alternative alignments for the construction and operation of a rail line within the Mina corridor, as well as the Caliente corridor. 2 Section 114(f)(4) of the NWPA provides that any environmental impact statement ''prepared in connection with a repository * * * shall, to the extent practicable, be adopted by the Commission

474

DOE/EIS-0157-SA-01; Supplement Analysis for Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore  

Broader source: Energy.gov (indexed) [DOE]

Analysis Analysis S-1 March 1999 Findings ♦ This supplement analysis evaluated a set of new and modified projects and proposals and other new information and concluded that no supplementation of the 1992 EIS/EIR for Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories (SNL), Livermore, is needed. Either the projected impacts are within the bounds of the 1992 EIS/EIR, the impacts were anticipated by mitigation measures established in the 1992 EIS/EIR, or the incremental differences in impacts are not significant. ♦ While proposed increases in administrative limits for radioactive materials at LLNL might slightly increase radiological releases during accidents, the resulting consequences are expected to remain essentially the same as described in the 1992

475

DOE/EIS-0350-SA-01: Supplement Analysis for Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory, Los Alamos, NM (01/05)  

Broader source: Energy.gov (indexed) [DOE]

SA-01 SA-01 Supplement Analysis Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory, Los Alamos, New Mexico Changes to the Location of the CMRR Facility Components January 2005 Department of Energy National Nuclear Security Administration Los Alamos Site Office Supplement Analysis Introduction This Supplement Analysis (SA) has been prepared to determine if the Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory (CMRR EIS) (DOE/EIS-0350) adequately addresses the environmental effects of proposed changes in the location of certain components of the Preferred Alternative that the National Nuclear Security

476

Supplement Tables - Supplemental Data  

Gasoline and Diesel Fuel Update (EIA)

5 5 For Further Information . . . The Annual Energy Outlook 2005 (AEO2005) was prepared by the Energy Information Administration (EIA), under the direction of John J. Conti (john.conti@eia.doe.gov, 202/586-2222), Director, Integrated Analysis and Forecasting and Acting Director, International, Economic and Greenhouse Gases Division; Paul D. Holtberg (paul.holtberg@eia.doe.gov, 202/586-1284), Director, Demand and Integration Division; Joseph A. Beamon (joseph.beamon@eia.doe.gov, 202-586-2025), Director, Coal and Electric Power Division; James M. Kendell (james.kendell@eia.doe.gov, 202/586-9646), Director, Oil and Gas Division; and Andy S. Kydes (andy.kydes@eia.doe.gov, 202/586-2222), Senior Technical Advisor. For ordering information and questions on other energy statistics available from EIA, please contact EIA's National Energy Information Center. Addresses, telephone numbers, and hours are as follows: