  1. Final EIS Volume 2

    Office of Environmental Management (EM)

    Volume 2 Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center DOE/EIS-0226 January 2010 The West Valley Site (Appendices A through R) AVAILABILITY OF THE FINAL EIS FOR DECOMMISSIONING AND/OR LONG- TERM STEWARDSHIP AT THE WEST VALLEY DEMONSTRATION PROJECT AND WESTERN NEW YORK NUCLEAR SERVICE CENTER For further information on this Final EIS, or to request a copy of the EIS or

  2. Final EIS Volume 3

    Office of Environmental Management (EM)

    Volume 3 Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center DOE/EIS-0226 January 2010 The West Valley Site Comment Response Document Final Environmental Impact Statement for AVAILABILITY OF THE FINAL EIS FOR DECOMMISSIONING AND/OR LONG- TERM STEWARDSHIP AT THE WEST VALLEY DEMONSTRATION PROJECT AND WESTERN NEW YORK NUCLEAR SERVICE CENTER For further information on this Final

  3. EIS-0102: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    83 Wholesale Power Rate EIS-0102: Final Environmental Impact Statement More Documents & Publications EIS-0071: Final Environmental Impact Statement EIS-0202: Final Environmental...

  4. Example USFS Preliminary Section 4(e) Report | Open Energy Information

    Open Energy Info (EERE)

    4(e) Report Jump to: navigation, search OpenEI Reference LibraryAdd to library Personal Communication: Example USFS Preliminary Section 4(e) Report Abstract This letter...

  5. EIS-0468: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0468: EPA Notice of Availability of the Final Environmental Impact Statement American Centrifuge Plant, Piketon, OH EIS No. 20110153, Final EIS, DOE,...

  6. EIS-0015: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    15: Final Environmental Impact Statement EIS-0015: Final Environmental Impact Statement U.S. Spent Fuel Policy PDF icon EIS-0015: Final Environmental Impact Statement, volume 1 PDF icon EIS-0015: Final Environmental Impact Statement, volume 2 PDF icon EIS-0015: Final Environmental Impact Statement, volume 3 PDF icon EIS-0015: Final Environmental Impact Statement, volume 4 PDF icon EIS-0015: Final Environmental Impact Statement, volume 5 More Documents & Publications EIS-0093: Final

  7. EIS-0073: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0073: Final Environmental Impact Statement Solvent Refined Coal-I Demonstration Project, Daviess County, Kentucky PDF icon EIS-0073-FEIS-volume1.pdf PDF icon EIS-0073-FEIS-volume2.pdf More Documents & Publications EIS-0069: Final Environmental Impact Statement EIS-0098: Final Environmental Impact Statement EIS-0071

  8. EIS-0072: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    2: Final Environmental Impact Statement EIS-0072: Final Environmental Impact Statement Great Plains Gasification Project, Mercer County, North Dakota PDF icon EIS-0072: Final Environmental Impact Statement, Volume 1 PDF icon EIS-0072: Final Environmental Impact Statement, Volume 2 PDF icon EIS-0072: Final Environmental Impact Statement, Volume 3 More Documents & Publications EIS-0025: Final Environmental Impact Statement EIS-0004: Final Environmental Impact Statement EIS-0066

  9. EIS-0032: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    32: Final Environmental Impact Statement EIS-0032: Final Environmental Impact Statement 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company PDF icon EIS-0032: Final Environmental Impact Statement More Documents & Publications EIS-0097: Final Environmental Impact Statement EIS-0067: Final Environmental Impact Statement EIS-0129: Final Environmental Impact Statement

  10. EIS-0060: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Final Environmental Impact Statement EIS-0060: Final Environmental Impact Statement Bonneville Power Administration Proposed FY 1981 Program PDF icon EIS-0060: Final Environmental Impact Statement More Documents & Publications EIS-0005: Final Environmental Impact Statement EIS-0097: Final Environmental Impact Statement EIS-0048-S: Final Supplemental Environmental Impact Statement to FES-75-79

  11. EIS-0162: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    2: Final Environmental Impact Statement EIS-0162: Final Environmental Impact Statement Bonneville Power Administration (BPA) Resource Programs PDF icon EIS-0162-FEIS-Summary.pdf PDF icon EIS-0162-FEIS-Volume_1.pdf PDF icon EIS-0162-FEIS-Volume_2_Addendum_Appendices.pdf PDF icon EIS-0162-FEIS-Volume_3.pdf More Documents & Publications EIS-0145: Final Environmental Impact Statement EIS-0201: Final Environmental Impact Statement EIS-017

  12. EIS-0370: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0370: Final Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Final Environmental Impact Statement (Summary) PDF icon EIS-0370: Final Environmental Impact Statement (Volume 1) PDF icon EIS-0370: Final Environmental Impact Statement (Volume 2) PDF icon EIS-0370: Final Environmental Impact Statement (Volume 3) More Documents & Publications EIS-0370: Draft Environmental Impact Statement EIS-0370:

  13. EIS-0129: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    9: Final Environmental Impact Statement EIS-0129: Final Environmental Impact Statement New England/Hydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-FEIS.pdf PDF icon EIS-0129-FEIS-Addendum.pdf More Documents & Publications EIS-0007: Draft Environmental Impact Statement EIS-0125: Final Environmental Impact Statement EIS-0129: Draft

  14. EIS-0511: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    1: Final Environmental Impact Statement EIS-0511: Final Environmental Impact Statement Aguirre Offshore GasPort Project, Puerto Rico FERC issued a Final EIS with 10 cooperating...

  15. EIS-0503: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0503: Final Environmental Impact Statement New England Clean Power Link, Vermont DOE prepared this Final EIS to evaluate the potential...

  16. USFS Electric Transmission Line Easement Form FS-2700-31 | Open...

    Open Energy Info (EERE)

    USFS Electric Transmission Line Easement Form FS-2700-31 Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: USFS Electric Transmission...

  17. EIS-0064: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    4: Final Environmental Impact Statement EIS-0064: Final Environmental Impact Statement Rocky Flats Plant Site, Jefferson County, Golden, Colorado (see also ERDA-1545-D) PDF icon EIS-0064: Final Environmental Impact Statement, volume 1 PDF icon EIS-0064: Final Environmental Impact Statement, volume 2 PDF icon EIS-0064: Final Environmental Impact Statement, volume 3 More Documents & Publications EIS-0089: Final Environmental Impact Statement EIS-0015: Final Environmental Impact Statement

  18. EIS-0342: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    icon EIS-0342-FEIS-2004.pdf PDF icon EIS-0342-FEIS-App-2004.pdf PDF icon EIS-0342-FEIS-Figures-2004.pdf More Documents & Publications EIS-0330: Final Environmental Impact Statement...

  19. EIS-0050-S: Final Supplemental Impact Statement | Department of Energy

    Energy Savers [EERE]

    50-S: Final Supplemental Impact Statement EIS-0050-S: Final Supplemental Impact Statement Commercial and Apartment Conservation Service Program, Supplemental PDF icon EIS-0050_SEIS.pdf More Documents & Publications EIS-0095: Final Environmental Impact Statement EIS-0102: Final Environmental Impact Statement EIS-0127

  20. EIS-0068: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    8: Final Environmental Impact Statement EIS-0068: Final Environmental Impact Statement Development Policy Options for the Naval Oil Shale Reserves in Colorado PDF icon EIS-0068: Final Environmental Impact Statement More Documents & Publications EIS-0070: Draft Environmental Impact Statement EIS-0085-S: Final Environmental Impact Statement EIS-0071

  1. EIS-0071: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    1: Final Environmental Impact Statement EIS-0071: Final Environmental Impact Statement Memphis Light, Gas and Water Division Industrial Fuels Gas Demonstration Plant, Memphis, Shelby County, Tennessee PDF icon EIS-0071-FEIS.pdf More Documents & Publications EIS-0069: Final Environmental Impact Statement EIS-0073: Final Environmental Impact Statement EIS-0102

  2. EIS-0085-S: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    5-S: Final Environmental Impact Statement EIS-0085-S: Final Environmental Impact Statement Liquid-Metal Fast Breeder Reactor Program, Supplemental PDF icon EIS-0085-FSEIS.pdf More Documents & Publications EIS-0018: Final Environmental Impact Statement EIS-0068: Final Environmental Impact Statement EIS-0071

  3. EIS-0116: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    6: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project PDF icon EIS-0116-FEIS.pdf More Documents & Publications EIS-0005-FS: Draft Supplemental Environmental Impact Statement EIS-0112: Final Environmental Impact Statement EIS-0048-S: Final Supplemental Environmental Impact Statement to FES-75-79

  4. EIS-0454: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project PDF icon EIS-0454-FEIS-2011.pdf More...

  5. EIS-0486: DOE Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0486: DOE Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE announces the availability of a final EIS that ...

  6. EIS-0486: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0486: EPA Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project EPA announces the availability of a final EIS that ...

  7. EIS-0413: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan PDF icon EIS-0413: Final Environmental Impact Statement - Appendix B-4 - Bat and Bird Conservation Strategy PDF icon EIS-0413: Final Environmental Impact Statement -...

  8. EIS-0503: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0503: EPA Notice of Availability of Final Environmental Impact Statement New England Clean Power Link, Vermont DOE prepared this Final EIS to evaluate the...

  9. EIS-0145: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0145: Final Environmental Impact Statement Non-Federal Participation in Alternating Current Intertie PDF icon DOE/EIS-0145, Bonneville Power Administration, Summary Non-Federal Participation in AC Intertie Final Environmental Impact Statement (January 1994) PDF icon EIS-0145-FEIS-01-1994_0.pdf PDF icon EIS-0145-FEIS-02-1994_0.pdf More Documents & Publications EIS-0197: Final Environmental Impact Statement EIS-0125: Final Environmental Impact

  10. EIS-0164: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    4: Final Environmental Impact Statement EIS-0164: Final Environmental Impact Statement Pacific Gas Transmission/Pacific Gas and Electric and Altamont Natural Gas Pipeline Project PDF icon EIS-0164-FEIS.pdf PDF icon EIS-0164-FEIS-Appendices.pdf PDF icon EIS-0164-FEIS-Comments.pdf More Documents & Publications Response to several FOIA requests - Renewable Energy. EIS-0489: Final Environmental Impact Statement EIS-020

  11. EIS-0361: EPA Notice of Availability of the Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    EPA Notice of Availability of the Final Environmental Impact Statement EIS-0250-S1 and EIS-0250-S2: EPA Notice of Availability of the Draft Supplemental Environmental...

  12. EIS-0426: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0473: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement...

  13. EIS-0404: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0407: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement...

  14. EIS-0459: EPA Notice of Availability of Final Programmatic Environment...

    Broader source: Energy.gov (indexed) [DOE]

    renewable energy. EIS-0459-FEIS-EPA-NOA-2015.pdf More Documents & Publications EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement...

  15. EIS-0450: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS is available at: http:www.blm.govwysteninfoNEPAdocumentshddtranswestFEIS.html. More Documents & Publications EIS-0450: BLM and WAPA Notice of Availability of a Final...

  16. EIS-0158: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    58: Final Environmental Impact Statement EIS-0158: Final Environmental Impact Statement Supplemental Environmental Impact Statement to the 1979 Petroleum Production at Maximum Efficient Rate, Naval Petroleum Reserve No. 1(Elk Hills), Kern County, California (This EIS supplements DOE/EIS-0012.) PDF icon EIS-0158-FEIS.pdf More Documents & Publications EA-0962: Final Environmental Assessment EA-1956: Final Environmental Assessment EIS-0012: Final

  17. USFS | Open Energy Information

    Open Energy Info (EERE)

    Name: United States Forest Service Abbreviation: USFS Address: 1400 Independence Ave., SW Place: Washington, D.C. Zip: 20250-1111 Year Founded: 1905 Website: www.fs.fed.us...

  18. EIS-0026-S: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy S: Final Supplemental Environmental Impact Statement EIS-0026-S: Final Supplemental Environmental Impact Statement Final Supplemental Environmental Impact Statement, Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico PDF icon EIS-0026-S: Final Supplemental Environmental Impact Statement, Executive Summary PDF icon EIS-0026-S: Final Supplemental Environmental Impact Statement, Volume 1 PDF icon EIS-0026-S: Final Supplemental Environmental Impact Statement, Volume 2 PDF icon

  19. EIS-0283: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0283: Final Environmental Impact Statement Surplus Plutonium Disposition This EIS analyzes the potential environmental impacts associated with alternatives for the disposition of surplus plutonium. PDF icon EIS-0283-Summary-1999.pdf PDF icon EIS-0283-FEIS_Vol1a-1999.pdf PDF icon EIS-0283-FEIS_Vol1b-1999.pdf PDF icon EIS-0283-FEIS_Vol2-1999.pdf PDF icon EIS-0283-FEIS_Vol3a-1999.pdf PDF icon EIS-0283-FEIS_Vol3b-1999.pdf More Documents & Publications

  20. EIS-0386: Final Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Final Programmatic Environmental Impact Statement EIS-0386: Final Programmatic Environmental Impact Statement Designation of Energy Corridors on Federal Land in the 11 Western States PDF icon EIS-0386-FEIS-Summary-2008.pdf PDF icon EIS-0386-FEIS-FrontMatter-2008.pdf PDF icon EIS-0386-FEIS-Ch1-2008.pdf PDF icon EIS-0386-FEIS-Ch2-2008.pdf PDF icon EIS-0386-FEIS-Ch3_Part1-2008.pdf PDF icon EIS-0386-FEIS-Ch3_Part2-2008.pdf PDF icon EIS-0386-FEIS-Ch3_Part3-2008.pdf PDF icon

  1. EIS-0312: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0312: Final Environmental Impact Statement Fish and Wildlife Implementation Plan In this final environmental impact statement (FEIS), with...

  2. EIS-0288-S1: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Final Supplemental Environmental Impact Statement EIS-0288-S1: Final Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Final Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor (DOE/EIS-0288-S1) supplements DOE's 1999 Final EIS (DOE/EIS-0288), which addressed the production of tritium in Tennessee Valley Authority (TVA) reactors at Watts Bar Unit 1 in Rhea County, TN,

  3. EIS-0021: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Strategic Petroleum Reserve, Seaway Group Salt Domes, Brazoria County, Texas (also see EIS-0075-S and EIS-0029)

  4. EIS-0408: Final Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy Final Programmatic Environmental Impact Statement EIS-0408: Final Programmatic Environmental Impact Statement EIS-0408: Upper Great Plains Wind Energy Programmatic EIS Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, issued the Upper Great Plains Wind Energy Final Programmatic EIS, which evaluates issues and potential environmental impacts associated with wind energy development within Western's Upper Great Plains Customer Service

  5. EIS-0485: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0485: Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power Administration issued a Final EIS that evaluates the potential environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near the city of O'Neill, Nebraska, to Western's power transmission system. PDF icon EIS-0485-FEIS-2014.pdf More Documents & Publications EIS-0485: Notice of

  6. EIS-0455: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0455: Final Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA The BLM's purpose and need for the GSEP is to...

  7. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Final Environmental Impact Statement EIS-0471: Final Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho The U.S. Department of Energy...

  8. EIS-0343: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0343: Final Environmental Impact Statement COB Energy Facility COB Energy Facility, LLC, a subsidiary of Peoples Energy Resources Company...

  9. EIS-0333: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Final Environmental Impact Statement EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm This Draft Environmental Impact Statement...

  10. EIS-0095: Final Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0095: Final Environmental Impact Statement Bonneville Power Administration's Expanded Residential Weatherization Program The U.S....

  11. EIS-0449: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0449: Final Environmental Impact Statement Blythe Solar Power Project This Plan AmendmentFinal Environmental Impact Statement (PAFEIS) addresses the possible...

  12. EIS-0499: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0499: EPA Notice of Availability of Final Environmental Impact Statement Great Northern Transmission Line Project, Minnesota EPA announced the availability of the Final ...

  13. EIS-0414: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0414: EPA Notice of Availability of a Final Environmental Impact Statement Energia Sierra Juarez Transmission Project EPA announces the availability of the Final...

  14. EIS-0471: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0468: Final Environmental Impact Statement EA-1607: Final Environmental Assessment Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched Uranium...

  15. EIS-0317-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Supplemental Environmental Impact Statement EIS-0317-S1: Final Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  16. EIS-0082-S1: Final Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    S1: Final Supplemental Environmental Impact Statement EIS-0082-S1: Final Supplemental Environmental Impact Statement The Department of Energy (DOE) limits electronic access to...

  17. EIS-0108: Final Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    108: Final Environmental Impact Statement EIS-0108: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

  18. EIS-0219: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Impact Statement EIS-0219: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this...

  19. EIS-0309: Final Site-Wide Environmental Impact Statement | Department...

    Energy Savers [EERE]

    09: Final Site-Wide Environmental Impact Statement EIS-0309: Final Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA...

  20. EIS-0350-SA-02: Final Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    350-SA-02: Final Supplement Analysis EIS-0350-SA-02: Final Supplement Analysis Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los...

  1. EIS-0377: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project A systems study was carried out to identify...

  2. EIS-0332: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project This document is the final Environmental Impact Statement...

  3. EIS-0063: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0063: Final Environmental Impact Statement Waste Management Operations, Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Hanford Site, Richland, Washington PDF icon EIS-0063-FEIS.pdf More Documents & Publications EIS-0063: Draft

  4. EIS-0113: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    13: Final Environmental Impact Statement EIS-0113: Final Environmental Impact Statement Disposal of Hanford Defense High-Level, Transuranic and Tank Wastes, Hanford Site, Richland, Washington For more information, see the project page: http://energy.gov/node/943036. PDF icon EIS-0113-FEIS-1987_Vol1Part1.pdf PDF icon EIS-0113-FEIS-1987_Vol1Part2.pdf PDF icon EIS-0113-FEIS-1987_Vol2Part1.pdf PDF icon EIS-0113-FEIS-1987_Vol2Part2.pdf PDF icon EIS-0113-FEIS-1987_Vol3Part1.pdf PDF icon

  5. EIS-0375: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Disposal of Greater-Than-Class C Low-Level Radioactive Waste The U.S. Department of Energy (DOE) has prepared this Final Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (Final GTCC EIS) to evaluate the potential environmental impacts associated with the proposed development, operation, and long-term management of a disposal facility or facilities for GTCC low-level radioactive waste (LLRW) and DOE GTCC-like waste.

  6. EIS-0421: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0421: Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA PDF icon BEK_FEIS_Volume1.pdf PDF icon BEK_FEIS_Volume2_Appendices_Table_of_Contents.pdf PDF icon BEK_FEIS_Volume3_Comments_and_Responses.pdf More Documents & Publications EIS-0421: Record of Decision EIS-0421: Draft Environmental Impact Statement EIS-0421: Record of Decision and Mitigation Action Plan

  7. EIS-0306: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0306: Final Environmental Impact Statement Treatment and Management of Sodium-Bonded Spent Nuclear Fuel DOE prepared a Final EIS that evaluated the potential environmental impacts of treatment and management of DOE-owned sodium bonded spent nuclear fuel. PDF icon EIS-0306-FEIS-Summary-2000.pdf PDF icon EIS-0306-FEIS-Volume1-2000.pdf PDF icon EIS-0306-FEIS-Volume2-2000.pdf More Documents & Publications Annual DOE Occupational Radiation Exposure | 2004

  8. EIS-0459: Final Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications EIS-0459: Draft Programmatic Environmental Impact Statement Hawai'i's Evolution: Hawai'i Powered. Technology Driven. EIS-0459: Amended Notice of ...

  9. EIS-0251: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0251: Final Environmental Impact Statement Department of the Navy Final Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel (November 1996) This Final Environmental Impact Statement addresses six general alternative systems for the loading, storage, transport, and possible disposal of naval spent nuclear fuel following examination. PDF icon EIS-0251-FEIS-1996.pdf More Documents & Publications EIS-0251:

  10. EIS-0290: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0290: Final Environmental Impact Statement Advanced Mixed Waste Treatment Project (AMWTP) The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the Idaho National Environmental and Engineering Laboratory (INEEL). PDF icon Advanced Mixed Waste Treatment Project (AMWTP) Final Environmental Impact Statement, DOE/EIS-0290 (January 1999)

  11. EIS-0417: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    7: Final Environmental Impact Statement EIS-0417: Final Environmental Impact Statement South Mountain Freeway (Loop 202); Phoenix, Arizona The Federal Highway Administration and the Arizona Department of Transportation issued a Final EIS that evaluates the potential environmental impacts of a proposed new multi-lane freeway in the metropolitan Phoenix area. DOE's Western Area Power Administration, a cooperating agency, would move or reconfigure several transmission line towers. The Final EIS is

  12. EIS-0493: Notice of Adoption of Final Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy Notice of Adoption of Final Environmental Impact Statement EIS-0493: Notice of Adoption of Final Environmental Impact Statement EPA issued a notice of DOE's adoption of a FERC EIS for a liquefied natural gas export and import terminal on the north shore of Corpus Christi Bay in Nueces and San Patricio Counties, Texas. DOE, Office of Fossil Energy, was a cooperating agency. Document Download PDF icon Notice of Adoption of Final EIS More Documents & Publications

  13. Final EIS for Champlain Hudson Power Express Transmission Project Now

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Available | Department of Energy Final EIS for Champlain Hudson Power Express Transmission Project Now Available Final EIS for Champlain Hudson Power Express Transmission Project Now Available August 8, 2014 - 4:44pm Addthis The U.S. Department of Energy (DOE) has prepared a Final Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended (42 U.S.C. 4321 et seq.), the Council on Environmental Quality (CEQ) NEPA regulations (40 CFR

  14. EIS-0287: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0287: Final Environmental Impact Statement Idaho High-Level Waste and Facilities Disposition This EIS analyzes the potential environmental consequences of alternatives for managing high- level waste (HLW) calcine, mixed transuranic waste/sodium bearing waste (SBW) and newly generated liq- uid waste at the Idaho National Engineering and Environmental Laboratory (INEEL) in liquid and solid forms. This EIS also analyzes alternatives for the final disposition

  15. EIS-0447: EPA Notice of Availability Final Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy EPA Notice of Availability Final Environmental Impact Statement EIS-0447: EPA Notice of Availability Final Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of the Champlain Hudson Power Express Transmission Line Project Final Environmental Impact Statement. Review Period Ends: 09/15/2014. PDF icon EIS-0447-FEIS-EPANOA-2014.pdf More Documents & Publications EIS-0288-S1: Revision to EPA

  16. EIS-0488: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0488: Final Environmental Impact Statement The Federal Energy Regulatory Commission (FERC) issued a final EIS for a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export LNG. DOE, a cooperating agency, adopted the EIS.

  17. EIS-0511: FERC Notice of Availability of FInal Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Project. For more information on this project, see the project page: http:energy.govnode1021761. Download Document EIS-0511: FERC Notice of Availability of FInal Environmental...

  18. EIS-0378: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0378: Final Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has...

  19. EIS-0493: FERC Notice of Availability of Final Environmental...

    Office of Environmental Management (EM)

    EIS-0493: FERC Notice of Availability of Final Environmental Impact Statement Corpus Christi LNG Terminal and Pipeline Project, Nueces and San Patricio Counties, Texas The Federal ...

  20. EIS-0440: DOE Notice of Availablity of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0440: DOE Notice of Availablity of the Final Environmental Impact Statement DOE announces the availability of the Quartzsite Solar Energy Project, La Paz County, AZ FEIS. This ...

  1. EIS-0400: EPA Notice of Availability of Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Final Environmental Impact Statement. EIS-0400-FEIS-EPANOA-2013.pdf More...

  2. EIS-0397: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0397: Final Environmental Impact Statement Lyle Falls Fish Passage Project BPA proposes to fund modifications to the existing Lyle Falls Fishway...

  3. EIS-0286: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0286: Final Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program The Hanford Site Solid (Radioactive and...

  4. EIS-0481: EPA Notice of Availability of Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    of Final Environmental Impact Statement More Documents & Publications EIS-0463-S1: EPA Notice of Availability of Supplement to the Draft Environmental Impact Statement...

  5. EIS-0423: DOE Notice of Availability of the Final Environmental...

    Office of Environmental Management (EM)

    of the Final Environmental Impact Statement More Documents & Publications EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement...

  6. EIS-0491: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0491: Final Environmental Impact Statement Lake Charles Liquefaction Project; Calcasieu Parish, Louisiana Federal Energy Regulatory Commission, with DOE...

  7. EIS-0093: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0093: Final Environmental Impact Statement Bonneville Power Administration's 1982 Rate Proposal The U.S. Department of Energy's Bonneville Power...

  8. EIS-0450: EPA Notice of Availability of a Final Environmental...

    Office of Environmental Management (EM)

    the availability of a final EIS, prepared by Western Area Power Administration and the Bureau of Land Management as joint lead agencies, that evaluates the potential environmental...

  9. EIS-0413: EPA Notice of Availability of a Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Searchlight Wind Energy Project Final EIS. The Department of the Interior's Bureau of Land Management, with DOE's Western Area Power Administration as a cooperating agency,...

  10. EIS-0374: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project This summary covers the major points of the draft...

  11. EIS-0441: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement More Documents & Publications EIS-0403: Final Programmatic Environmental Impact Statement EA-1989: Draft Environmental Assessment EA-1581: Draft Environmental Assessment...

  12. EIS-0444: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0444: EPA Notice of Availability of the Final Environmental Impact Statement Texas Clean Energy Project, Ector, Texas 2011-19917.pdf More Documents & Publications...

  13. EIS-0407: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Final Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Kansas PDF icon EIS-0407-NOA-FEIS-2010.pdf More Documents &...

  14. EIS-0393: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    issued a Final EIS that evaluates the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby, Montana. DOE's Bonneville...

  15. EIS-0377: DOE Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project The Western Area Power Administration...

  16. EIS-0421: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0421: EPA Notice of Availability of the Final Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA PDF icon...

  17. EIS-0236-S4: Final Supplemental Programmatic Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex Transformation The National Nuclear Security Administration (NNSA), an agency within...

  18. EIS-0410: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0410: Final Environmental Impact Statement Keystone Oil Pipeline Project For more information, see the project page: http:energy.govnode304135....

  19. EIS-0493: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0493: Final Environmental Impact Statement Corpus Christi LNG Terminal and Pipeline Project, Nueces and San Patricio Counties, Texas The Federal Energy Regulatory...

  20. EIS-0323: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0323: Final Environmental Impact Statement Sacramento Area Voltage Support The Western Area Power Administration's Central Valley Project transmission...

  1. EIS-0447: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0447: Final Environmental Impact Statement DOE prepared this Final EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border near Champlain, New York, to New York City. PDF icon EIS-0447-FEIS-Summary-2014.pdf PDF icon EIS-0447-FEIS-Vol_I-2014.pdf

  2. EIS-0097: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    97: Final Environmental Impact Statement EIS-0097: Final Environmental Impact Statement Bonneville Power Administration Transmission Facilities Vegetation Management Program The U.S. Department of Energy's Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program. PDF icon EIS-0097-FEIS.pdf PDF icon EIS-0097-FEIS-Appendices.pdf More Documents

  3. EIS-0279: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0279: Final Environmental Impact Statement Spent Nuclear Fuel Management, Aiken, South Carolina The proposed DOE action considered in this environmental impact statement (EIS) is to implement appropriate processes for the safe and efficient management of spent nuclear fuel and targets at the Savannah River Site (SRS) in Aiken County, South Carolina, including placing these materials in forms suitable for ultimate disposition. PDF icon DOE/EIS-0279,

  4. EIS-0472: Final Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Final Programmatic Environmental Impact Statement EIS-0472: Final Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado This EIS evaluated the environmental impacts of management alternatives for DOE's Uranium Leasing Program, under which DOE administers tracts of land in western Colorado for exploration, development, and the extraction of uranium and vanadium ores. PDF icon EIS-0472-FPEIS-Summary-2014.pdf PDF icon

  5. EIS-0139: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    39: Final Environmental Impact Statement EIS-0139: Final Environmental Impact Statement Trans-Alaska Gas System PDF icon EIS-0139-FEIS-1988.pdf More Documents & Publications Response to several FOIA requests - Renewable Energy. Alaska LNG Project LLC - 14-96-LNG Order 3643: Alaska LNG Project, LLC

  6. EIS-0499: EPA Notice of Availability of Final Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0499: EPA Notice of Availability of Final Environmental Impact Statement Great Northern Transmission Line Project, Minnesota EPA announced the availability of the Final Environmental Impact Statement for the Great Northern Transmission Line Project. The Final EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct,

  7. EIS-0393: EPA Notice of Availability of Final Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0393: EPA Notice of Availability of Final Environmental Impact Statement Montanore Project; Montana EPA announced the availability of a Final EIS prepared by USDA Forest Service (Kootenai National Forest) and the Montana Department of Environmental Quality to evaluate the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby,

  8. EIS-0459: DOE Notice of Availability of Final Programmatic Environmental

    Energy Savers [EERE]

    Impact Statement | Department of Energy DOE Notice of Availability of Final Programmatic Environmental Impact Statement EIS-0459: DOE Notice of Availability of Final Programmatic Environmental Impact Statement Hawaii Clean Energy Programmatic Environmental Impact Statement DOE issued a notice of availability of a final programmatic EIS that examines the potential environmental impacts of energy efficiency activities and renewable energy technologies that could assist the State of Hawaii in

  9. EIS-0459: EPA Notice of Availability of Final Programmatic Environmental

    Energy Savers [EERE]

    Impact Statement | Department of Energy EPA Notice of Availability of Final Programmatic Environmental Impact Statement EIS-0459: EPA Notice of Availability of Final Programmatic Environmental Impact Statement Hawaii Clean Energy Programmatic Environmental Impact Statement EPA issued a notice of availability of a final programmatic EIS that examines the potential environmental impacts of energy efficiency activities and renewable energy technologies that could assist the State of Hawaii in

  10. EIS-0474: EPA Notice of Availability of Final Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0474: EPA Notice of Availability of Final Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico The Bureau of Land Management and Western Area Power Administration announced the availability of a final EIS that evaluates the potential environmental impacts of the proposed Southline Transmission Project and addresses associated potential land use plan

  11. EIS-0474: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Final Environmental Impact Statement EIS-0474: Final Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico The Bureau of Land Management and Western Area Power Administration issued a final EIS that evaluates the potential environmental impacts of the proposed Southline Transmission Project and addresses associated potential land use plan amendments. The project would consist of a new 225-mile transmission line between existing substations at Afton, New

  12. EIS-0481: Final Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy 1: Final Programmatic Environmental Impact Statement EIS-0481: Final Programmatic Environmental Impact Statement Engineered High Energy Crop Programs Programmatic Environmental Impact Statement This Final Programmatic EIS (PEIS) evaluates the potential environmental impacts of implementing one or more programs to catalyze the deployment of engineered high energy crops (EHECs). A main component of the proposed EHEC programs would be providing financial assistance to evaluate the

  13. EIS-0486: DOE Notice of Availability of Final Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy Availability of Final Environmental Impact Statement EIS-0486: DOE Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE announces the availability of a final EIS that evaluates the potential environmental impacts of DOE participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed Project would include an overhead ± 600-kilovolt

  14. EIS-0486: EPA Notice of Availability of Final Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy Availability of Final Environmental Impact Statement EIS-0486: EPA Notice of Availability of Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project EPA announces the availability of a final EIS that evaluates the potential environmental impacts of DOE participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed Project would include an overhead ± 600-kilovolt

  15. EIS-0486: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Final Environmental Impact Statement EIS-0486: Final Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Final EIS to evaluate the potential environmental impacts of the proposed Plains & Eastern Project and alternatives to it. The proposed Project would include an overhead ± 600-kilovolt high-voltage direct current electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts primarily

  16. EIS-0489: Notice of Availability for Final Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy 9: Notice of Availability for Final Environmental Impact Statement EIS-0489: Notice of Availability for Final Environmental Impact Statement Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR) Federal Energy Regulatory Commission (FERC) issued a notice of availability of a Final EIS to analyze the potential environmental impacts of a proposal to construct and operate the Jordan Cove

  17. EIS-0499: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Final Environmental Impact Statement EIS-0499: Final Environmental Impact Statement Great Northern Transmission Line Project, Minnesota DOE prepared this Final EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 883-megawatt electric transmission system across the U.S.-Canada border. The proposed 220-mile transmission line would cross the border near Roseau, Minnesota, and

  18. EIS-0503: EPA Notice of Availability of Final Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0503: EPA Notice of Availability of Final Environmental Impact Statement New England Clean Power Link, Vermont DOE prepared this Final EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Transmission Developers, Inc.-New England, to construct, operate, maintain, and connect a new 1000-megawatt electric transmission system across the

  19. EIS-0511: FERC Notice of Availability of FInal Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 1: FERC Notice of Availability of FInal Environmental Impact Statement EIS-0511: FERC Notice of Availability of FInal Environmental Impact Statement Aguirre Offshore GasPort Project, Puerto Rico FERC issued a Notice of Availability of the Final EIS that it prepared with 10 cooperating agencies, including DOE, for the proposed Aguirre Offshore GasPort Project. For more information on this project, see the project page: http://energy.gov/node/1021761. Download

  20. EIS-0089: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    9: Final Environmental Impact Statement EIS-0089: Final Environmental Impact Statement Operation of PUREX and Uranium Oxide Plant Facilities, Hanford Site, Richland, Washington The U.S. Department of Energy developed this statement to evaluate the environmental impacts of resumption of operations of the PUREX/Uranium Oxide facilities at the Hanford Site to produce plutonium and other special nuclear materials for national defense needs. The final environmental impact statement (EIS) consists of

  1. EIS-0146: Final Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy 6: Final Programmatic Environmental Impact Statement EIS-0146: Final Programmatic Environmental Impact Statement Clean Coal Technology Demonstration Program The proposed action evaluated in this PEIS is to continue the Clean Coal Technology Demonstration Program (CCTDP) involving the selection, for cost-shared federal funding, of one or more clean coal projects proposed by the private sector. PDF icon DOE/EIS-0146, Department of Energy, DOE, Final Programmatic Environmental Impact

  2. EIS-0409: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0409: Final Environmental Impact Statement Kemper County Integrated Gasification Combined-Cycle (IGCC) Project This Final EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding and possibly a loan guarantee for construction and operation of advanced power generation plant in Kemper County, Mississippi. The project was selected under DOE's Clean Coal Power Initiative to demonstrate IGCC

  3. EIS-0433: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Impact Statement EIS-0433: Final Environmental Impact Statement Keystone XL Project Summary: The U.S. Department of State has issued the Final EIS for the Keystone XL Project. The proposed action is to construct and operate a crude oil pipeline and related facilities at the international border and continuing into the United States to transport Western Canadian Sedimentary Basin crude oil and other crude oils to a proposed tank farm in Cushing, Oklahoma, and to delivery

  4. EIS-0444: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0444: Final Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This final environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project

  5. EIS-0451: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0451: Final Environmental Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho DOE's Bonneville Area Power Administration issued a Final EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line that would extend from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection facility

  6. EIS-0472: EPA Notice of Availability of Final Programmatic Environmental

    Office of Environmental Management (EM)

    Impact Statement | Department of Energy Final Programmatic Environmental Impact Statement EIS-0472: EPA Notice of Availability of Final Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado EPA announces the availability of the Final Programmatic Environmental Impact Statement for the Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado. PDF icon EIS-0472-FPEIS-EPA-NOA-2014.pdf More Documents &

  7. EIS-0478: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0478: Final Environmental Impact Statement Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billings, Williams, McKenzie, and Mountrail Counties, North Dakota USDA Rural Utilities Service issued a Final EIS that evaluates the environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area Power Administration, a cooperating agency,

  8. EIS-0489: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0489: Final Environmental Impact Statement Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR) Federal Energy Regulatory Commission, with DOE as a cooperating agency, issued a Final EIS that analyzes the potential environmental impacts of a proposal to construct and operate the Jordan Cove Liquefaction and Pacific Connector Pipeline Projects, respectively a proposed

  9. EIS-0493: FERC Notice of Availability of Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy FERC Notice of Availability of Final Environmental Impact Statement EIS-0493: FERC Notice of Availability of Final Environmental Impact Statement Corpus Christi LNG Terminal and Pipeline Project, Nueces and San Patricio Counties, Texas The Federal Energy Regulatory Commission (FERC) announced the availability of a Final EIS that analyzes the potential environmental impacts of a proposal to construct and operate a liquefied natural gas export and import

  10. EIS-0375: DOE Notice of Availability of Final Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy DOE Notice of Availability of Final Environmental Impact Statement EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement Disposal of Greater-than-Class-C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste The U.S. Department of Energy (DOE) announces the availability of its Final Environmental Impact Statement (EIS) for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375), prepared

  11. EIS-0375: EPA Notice of Availability of Final Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy EPA Notice of Availability of Final Environmental Impact Statement EIS-0375: EPA Notice of Availability of Final Environmental Impact Statement Disposal of Greater-than-Class-C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste The U.S. Environmental Protection Agency announces the availability of the Final Environmental Impact Statement (EIS) for the Disposal of Greater-Than-Class C Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375). Document

  12. EIS-0099: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    99: Final Environmental Impact Statement EIS-0099: Final Environmental Impact Statement Remedial Actions at the Former Vitro Chemical Company Site, South Salt Lake, Salt Lake County, Utah The U.S. Department of Energy developed this statement to evaluate the environmental impacts of various scenarios associated with the cleanup of those residues remaining at the abandoned uranium mill tailings site located in South Salt Lake, Utah. PDF icon EIS-0099-FEIS-volume1.pdf PDF icon

  13. EIS-0226: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    6: Final Environmental Impact Statement EIS-0226: Final Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center The Decommissioning and/or Long-Term Stewardship EIS has been prepared in accordance with NEPA and the State Environmental Quality Review Act (SEQR) to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term

  14. Final EIS Keystone Pipeline Project Appendix E Pipeline Restrictive Layer

    Office of Environmental Management (EM)

    E Pipeline Restrictive Layer Areas Crossings Final EIS Keystone Pipeline Project Appendix F Soil Associations along the Keystone Pipeline Project Route Final EIS Keystone Pipeline Project Appendix F Soil Associations along the Keystone Pipeline Project Route Appendix G Public Water Supply Wells Within One Mile of the Proposed Keystone Pipeline Project Centerline (Note: This appendix is Table 3.5-6, taken directly from the Environmental Report for the Keystone Pipeline Project [TransCanada

  15. EIS-0120: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    0: Final Environmental Impact Statement EIS-0120: Final Environmental Impact Statement Waste Management Activities for Groundwater Protection Savannah River Plant, Aiken, South Carolina The U.S. Department of Energy (DOE) has prepared this environmental impact statement (EIS) to assess the environmental consequences of the implementation of modified waste management activities for hazardous, low-level radioactive, and mixed wastes for the protection of groundwater, human health, and the

  16. EIS-0125: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    5: Final Environmental Impact Statement EIS-0125: Final Environmental Impact Statement Bonneville Power Administration Intertie Development and Use The Bonneville Power Administration developed this EIS to examine the environmental effects of expanding the capacity of the Pacific Northwest/Pacific Southwest Intertie, adoption of a long-term Intertie Access Policy, and enabling firm power marketing between California and the Northwest in order to make possible additional short- and long-term

  17. EIS-0250-S1: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Final Supplemental Environmental Impact Statement EIS-0250-S1: Final Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada DOE's Proposed Action is to construct, operate, monitor, and eventually close a geologic repository at Yucca Mountain for the disposal of spent nuclear fuel and high-level radioactive waste. PDF icon EIS-0250-S1-FEIS-Summary-2008.pdf PDF icon

  18. EIS-0277: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    7: Final Environmental Impact Statement EIS-0277: Final Environmental Impact Statement Management of Certain Plutonium Residues and Scrub Alloy Stored at the Rocky Flats Environmental Technology Site This EIS evaluates the potential alternatives and impacts associated with a proposal to process certain plutonium residues and all of the scrub alloy currently stored at Rocky Flats. While ongoing stabilization activities at Rocky Flats are addressing immediate health and safety concerns associated

  19. EIS-0379 - Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC)

  20. EIS-0391: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0391: Final Environmental Impact Statement Hanford Tank Closure and Waste Management, Hanford Site, Richland, WA This EIS evaluates the environmental impacts for the following three key areas: (1) retrieval, treatment, and disposal of waste from 149 single-shell tanks (SSTs) and 28 double-shell tanks and closure of the SST system, (2) decommissioning of the Fast Flux Test Facility, a nuclear test reactor, and (3) disposal of Hanford's waste and other DOE

  1. EIS-0400: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0400: Final Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69-kV electric transmission line in Grand County. The proposed project would

  2. EIS-0414: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0414: Final Environmental Impact Statement Energia Sierra Juarez Transmission Project This EIS evaluates the potential environmental impacts from DOE's proposed Federal action of granting a Presidential permit to Energia Sierra Juarez U.S. Tranmssion, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and

  3. EIS-0419: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    9: Final Environmental Impact Statement EIS-0419: Final Environmental Impact Statement Whistling Ridge Energy Project, Skamania County, Washington This EIS evaluates the environmental impacts of a proposal to allow the electrical interconnection of Whistling Ridge Energy, LLC's proposed 75-megawatt (MW) wind project in Skamania County, Washington, to the Federal Columbia River Transmission System. DOE's Bonneville Power Administration will act as the federal lead agency under NEPA and the

  4. EIS-0427: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0427: Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona This EIS evaluates the environmental impacts of a proposed wind energy generation project in Coconino County, Arizona, on privately owned ranch lands and trust lands administered by the Arizona State Land Department. The proposed project includes a new transmission tie-line that would cross lands administered by Coconino National

  5. EIS-0460: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    0: Final Environmental Impact Statement EIS-0460: Final Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois This EIS evaluates the potential environmental impacts of DOE's proposed action to provide approximately $1 billion in cost-shared American Recovery and Reinvestment Act funding to the FutureGen Industrial Alliance, Inc. (Alliance) to support the planning, design, construction, and operation of a prototype power plant, including the capture, conveyance, and

  6. EIS-0473: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0473: Final Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion carbon dioxide (CO2) Capture and Sequestration Project for a financial assistance award through a competitive process under

  7. EIS-0389: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    facilities in Trinity County, California. The U.S. Forest Service (USFS), the Bureau of Land Management (BLM), and the Bureau of Reclamation (Reclamation) participated in...

  8. EIS-0464: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0464: Final Environmental Impact Statement Lake Charles Carbon capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This Final Environmental Impact Statement provides information about the potential environmental impacts associated with the Department of Energy's proposed action to provide financial assistance to Leucadia Energy, LLC (Leucadia) and with Leucadia's proposed Lake Charles Carbon Capture and Sequestration

  9. EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement

    Office of Environmental Management (EM)

    | Department of Energy S4: Final Supplemental Programmatic Environmental Impact Statement EIS-0236-S4: Final Supplemental Programmatic Environmental Impact Statement Complex Transformation The National Nuclear Security Administration (NNSA), an agency within the Department of Energy, has the responsibility to maintain the safety, security, and reliability of the United States' nuclear weapons stockpile. This Complex Transformation Supplemental Programmatic Environmental Impact Statement

  10. EIS-0285: Final Environmental Impact Statement, Volume 2 | Department of

    Office of Environmental Management (EM)

    Energy : Final Environmental Impact Statement, Volume 2 EIS-0285: Final Environmental Impact Statement, Volume 2 Bonneville Power Administration Transmission System Vegetation Management Program Volume 2: Appendices Appendix A - Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM

  11. EIS-0222: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Final Environmental Impact Statement EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan, Hanford Site, Richland, Washington The DOE has prepared this HCP EIS to evaluate the potential environmental impacts associated with implementing a comprehensive land-use plan (CLUP) for the Hanford Site for at least the next 50 years. The DOE is expected to use this land-use plan in its decision-making process to establish what is the "highest and best use" of the

  12. EIS-0337: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0337: Final Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Final West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal

  13. EIS-0386: EPA Notice of Availability of the Programmatic Final

    Office of Environmental Management (EM)

    Environmental Impact Statement | Department of Energy EPA Notice of Availability of the Programmatic Final Environmental Impact Statement EIS-0386: EPA Notice of Availability of the Programmatic Final Environmental Impact Statement Designation of Energy Corridors in 11 Western States, Preferred Location of Future Oil, Gas, and Hydrogen Pipelines and Electricity Transmission and Distribution Facilities on Federal Land PDF icon Notice of Availability of the Programmatic Final Environmental

  14. EIS-0440: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0440: Final Environmental Impact Statement Quartzsite Solar Energy Project The Final Environmental Impact Statement (FEIS) consists of a summary of changes made based on the comments received during the comment periods for the Draft Environmental Impact Statement (DEIS) and the Draft Resource Management Plan Amendment (DRMPA), which analyzed the impacts associated with the proposed construction, operation, and commissioning of the Quartzsite Solar Energy

  15. EIS-0083: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Final Northeast Regional Environmental Impact Statement; The Potential Conversion of Forty-Two Powerplants From Oil to Coal or Alternate Fuels

  16. EIS-0121: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    1: Final Environmental Impact Statement EIS-0121: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  17. EIS-0161: Final Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy 61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit

  18. EIS-0185: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    85: Final Environmental Impact Statement EIS-0185: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  19. EIS-0217: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    7: Final Environmental Impact Statement EIS-0217: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  20. EIS-0228: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    8: Final Environmental Impact Statement EIS-0228: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  1. EIS-0229: Final Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy 9: Final Programmatic Environmental Impact Statement EIS-0229: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit

  2. EIS-0243: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    3: Final Environmental Impact Statement EIS-0243: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  3. EIS-0249: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    49: Final Environmental Impact Statement EIS-0249: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  4. EIS-0269: Final Programmatic Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy 69: Final Programmatic Environmental Impact Statement EIS-0269: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit

  5. EIS-0270: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    0: Final Environmental Impact Statement EIS-0270: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  6. EIS-0297: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    297: Final Environmental Impact Statement EIS-0297: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  7. EIS-0350-SA-02: Final Supplement Analysis | Department of Energy

    Energy Savers [EERE]

    50-SA-02: Final Supplement Analysis EIS-0350-SA-02: Final Supplement Analysis Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico Supplement Analysis To meet mission requirements, the U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA) proposes to relocate analytical chemistry (AC) and materials characterization (MC) capabilities at Los Alamos National Laboratory (LANL) from the Chemistry and

  8. EIS-0376: Final Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Final Environmental Impact Statement EIS-0376: Final Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  9. EIS-0096: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    96: Final Environmental Impact Statement EIS-0096: Final Environmental Impact Statement Remedial Actions at the Former Vitro Rare Metals Plant Site, Canonsburg, Washington County, Pennsylvania This Canonsburg FEIS evaluates the environmental impacts associated with remedial actions in connection with residual radioactive materials remaining at the inactive uranium processing site located in Canonsburg, Washington county, Pennsylvania. The Canonsburg site is an 18.5-acre property that was

  10. EIS-0109: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Final Environmental Impact Statement EIS-0109: Final Environmental Impact Statement Long-Term Management of the Existing Radioactive Wastes and Residues at the Niagara Falls Storage Site The U.S. Department of Energy developed this statement to evaluate the environmental impacts of several alternatives for management and control of the radioactive wastes and residues at the Niagara Falls Storage Site, including a no action alternative, an alternative to manage wastes on site, and two off-site

  11. EIS-0126: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Final Environmental Impact Statement EIS-0126: Final Environmental Impact Statement Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado Note: Appendices A through E and H through M of the Draft Environmental Impact Statement (Volume 2) are incorporated by reference in this FEIS. Modifications to the appendices in response to comments are included in Section 6.0 of the FEIS; Section 6.25 contains an Errata Sheet that reflects

  12. EIS-0247: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0247: Final Environmental Impact Statement Construction and Operation of the Spallation Neutron Source The United States needs a high-flux, short- pulsed neutron source to provide its scientific and industrial research communities with a much more intense source of pulsed neutrons for neutron scattering research than is currently available. This source would assure the availability of a state-of-the-art neutron research facility in the United States in

  13. EIS-0407: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement EIS-0407: Final Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas DOE's Proposed Action is to provide federal funding to Abengoa Bioenergy Biomass of Kansas, LLC (Abengoa Bioenergy) to support the design, construction, and startup of a commercial-scale integrated biorefinery to be located near the city of Hugoton, Stevens County, Kansas. If DOE decides to provide federal funding, it would negotiate an agreement

  14. EIS-0026-S2: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy S2: Final Supplemental Environmental Impact Statement EIS-0026-S2: Final Supplemental Environmental Impact Statement Carlsbad Area Office, Waste Isolation Pilot Plant Disposal Phase SEIS-II evaluates environmental impacts resulting from the various treatment options; the transportation of TRU waste to WIPP using truck, a combination of truck and regular rail service, and a combination of truck and dedicated rail service; and the disposal of this waste in the repository. Evaluated

  15. EIS-0082-S2: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Final Supplemental Environmental Impact Statement EIS-0082-S2: Final Supplemental Environmental Impact Statement Savannah River Site Salt Processing This SEIS evaluates the potential environmental impacts of alternatives for separating the high-activity fraction from the low-activity fraction of the high-level radioactive waste salt solutions now stored in underground tanks at the Savannah River Site (SRS) near Aiken, South Carolina. The high-activity fraction of the high-level

  16. EIS-0123: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Impact Statement EIS-0123: Final Environmental Impact Statement Direct Service Industry Options BPA proposes to implement one or more options to reduce load fluctuations and revenue uncertainty resulting from its electrical service to 10 aluminum smelters and its other direct service industrial customers. BPA believes these options will give BPA greater ability to plan for power needs and help to maintain its relatively strong financial position during the current period

  17. EIS-0150: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    0: Final Environmental Impact Statement EIS-0150: Final Environmental Impact Statement Salt Lake City Area Integrated Projects Electric Power Marketing The Western Area Power Administration (Western) proposes to establish the level of its commitment (sales) of long- term firm electrical capacity and energy from the Salt Lake City Area Integrated Projects (SLCA/IP) hydroelectric power plants. Power generated by the SLCA/IP facilities or purchased by Western from other sources is provided to

  18. EIS-0171: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    71: Final Environmental Impact Statement EIS-0171: Final Environmental Impact Statement Bonneville Power Administration, PacifiCorp Capacity Power Sale Contract The Bonneville Power Administration (BPA) must respond to the need for power as represented by PacifiCorp's request for a continued supply of firm capacity. BPA has surplus electrical capacity (peakload energy) that BPA projects will not be required to meet its existing obligations. Such obligations include those to meet the loads of

  19. EIS-0189: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    9: Final Environmental Impact Statement EIS-0189: Final Environmental Impact Statement Tank Waste Remediation System, Hanford Site, Richland, Washington This document analyzes the potential environmental consequences related to the Hanford Site Tank Waste Remediation System (TWRS) alternatives for management and disposal of radioactive, hazardous, and mixed waste, and the management and disposal of approximately 1,930 cesium and strontium capsules located at the Hanford Site. PDF icon

  20. EIS-0201: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    1: Final Environmental Impact Statement EIS-0201: Final Environmental Impact Statement Coyote Springs Cogeneration Project and Portland General Electric Company's Request for Transmission Service The Coyote Springs Cogeneration Project is a proposed natural gas-fired cogeneration power plant near Boardman, Oregon. The proposed power plant would be built on a g-hectare (22-acre) site in the Port of Morrow Industrial Park. The plant would have two combustion turbines that would generate 440

  1. EIS-0271: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0271: Final Environmental Impact Statement Construction and Operation of a Tritium Extraction Facility at the Savannah Siver Site DOE proposes to construct and operate a Tritium Extraction Facility (TEF) at H Area on the Savannah River Site (SRS) to provide the capability to extract tritium from commercial light water reactor (CLWR) targets and from targets of similar design. The proposed action is also DOE's preferred alternative. An action alternative

  2. EIS-0303: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    : Final Environmental Impact Statement EIS-0303: Final Environmental Impact Statement High-Level Waste Tank Closure DOE proposes to close the high-level waste (HLW) tanks at the Savannah River Site (SRS) in accordance with applicable laws and regulations, DOE Orders, and the Industrial Wastewater Closure Plan for F- and H-Area High-Level Waste Tank Systems (approved by the South Carolina Department of Health and Environmental Control), which specifies the management of residuals as waste

  3. EIS-0310: Final Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy Final Programmatic Environmental Impact Statement EIS-0310: Final Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, the DOE is responsible for ensuring the availability of isotopes for medical, industrial and research applications, meeting the nuclear material needs of other Federal agencies, and undertaking research and development activities related to development of nuclear power for civilian use. To meet these

  4. EIS-0336: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0336: Final Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line A DOE Presidential Permit is required before anyone can construct, connect, operate, and maintain an electric transmission line across the U.S. border. On August 17, 2000, TEP applied to DOE/FE for a Presidential Permit to construct a double-circuit 345,000 volt (345-kV) electric transmission line to transmit 500 MW of electricity. The transmission

  5. EIS-0350-S1: Final Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Final Supplemental Environmental Impact Statement EIS-0350-S1: Final Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico Abstract: NNSA, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing the nuclear facility portion

  6. EIS-0399: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0399: Final Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at the existing NorthWestern Energy (NWE) 230-kV Switchyard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north

  7. EIS-0403: Final Programmatic Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy 3: Final Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States (AZ, CA, CO, NV, NM, and UT) The BLM and DOE have jointly prepared this PEIS to evaluate actions that the agencies are considering taking to further facilitate utility-scale solar energy development in six southwestern states. For the BLM, this includes the evaluation of a new Solar Energy Program applicable to solar

  8. EIS-0426: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Final Environmental Impact Statement EIS-0426: Final Environmental Impact Statement This Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada (NNSS SWEIS) analyzed the potential environmental impacts of proposed alternatives for continued management and operation of the Nevada National Security Site (NNSS) (formerly known as the Nevada

  9. EIS-0443: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    3: Final Environmental Impact Statement EIS-0443: Final Environmental Impact Statement Project Financing for Southwest Intertie Project-South The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada

  10. EIS-0476: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    6: Final Environmental Impact Statement EIS-0476: Final Environmental Impact Statement Department of Energy Loan Guarantees for Proposed Units 3 and 4 at the Vogtle Electric Generating Plant, Burke County, GA The U.S. Department of Energy (DOE) is proposing to issue a loan guarantee to several applicants to support funding for construction and start-up of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, an advanced nuclear generating facility for the production of electric power (the

  11. EIS-0423: DOE Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy Final Environmental Impact Statement EIS-0423: DOE Notice of Availability of the Final Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury Download Document PDF icon EIS-0423: DOE Notice of Availability of the Final Environmental Impact Statement More Documents & Publications EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423: EPA Notice of Availability of the Final

  12. EIS-0226: DOE Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy (referred to as the Final Decommissioning and/or Long-Term Stewardship EIS or ''Final EIS''). PDF icon DOE/EIS-0226, Notice of Availability of the Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center, 75 FR 4803 (January 2010) More Documents & Publications EIS-0226: DOE Notice of Availability of the Final Environmental Impact Statement

  13. EIS-0361: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IS-0361-FEIS-01-2007.pdf PDF icon EIS-0361-FEIS-02-2007.pdf PDF icon EIS-0361-FEIS-03-2007.pdf PDF icon EIS-0361-FEIS-Figures-2007.pdf More Documents & Publications EIS-0361: Draft...

  14. EIS-0370: EPA Notice of Availability of the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 370: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0370: EPA Notice of Availability of the Final Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: EPA Notice of Availability of the Final Environmental Impact Statement More Documents & Publications EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: EPA Notice of Availability of

  15. EIS-0380: EPA Notice of Availability of the Final Site-Wide Environmen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Final Site-Wide Environmental Impact Statement EIS-0380: EPA Notice of Availability of the Final Site-Wide Environmental Impact Statement...

  16. EIS-0470: EPA Notice of Adoption of the Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: EPA Notice of Adoption of the Final Environmental Impact Statement EIS-0470: EPA Notice of Adoption of the Final Environmental Impact Statement Cape Wind Energy Project in ...

  17. EIS-0423-S1: EPA Notice of Availability of Final Supplemental...

    Office of Environmental Management (EM)

    Final Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement Long-Term Management and Storage of...

  18. EIS-0423-S1: EPA Notice of Availability of Final Supplemental...

    Energy Savers [EERE]

    23-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement...

  19. Geothermal Resources Leasing Programmatic EIS | Open Energy Informatio...

    Open Energy Info (EERE)

    Leasing Programmatic EIS Jump to: navigation, search The Bureau of Land Management (BLM) and the United States Forest Service (USFS) have prepared a joint Programmatic...

  20. EIS-0447: EPA Notice of Availability Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Ends: 09152014. EIS-0447-FEIS-EPANOA-2014.pdf More Documents & Publications EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental Environmental Impact...

  1. EIS-0460: EPA Notice of Availability of Final Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0447: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental...

  2. EIS-0370: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental Environmental...

  3. EIS-0470: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appendix B - Agency Correspondence PDF icon EIS-0470-FEIS- Appendix C - Storm Water Pollution Prevention Plan PDF icon EIS-0470-FEIS- Appendix D - Oil Spill Response Plan PDF...

  4. USFS Humboldt-Toiyabe National Forest | Open Energy Information

    Open Energy Info (EERE)

    USFS Humboldt-Toiyabe National Forest Jump to: navigation, search Name: USFS Humboldt-Toiyabe National Forest Abbreviation: Humbolt-Toiyabe NF Address: 1200 Franklin Way Place:...

  5. USFS-Climate Change Resource Center | Open Energy Information

    Open Energy Info (EERE)

    USFS-Climate Change Resource Center Jump to: navigation, search Tool Summary LAUNCH TOOL Name: USFS-Climate Change Resource Center AgencyCompany Organization: United States...

  6. EIS-0488: Notice of Adoption of FERC Final Environmental Impact Statement |

    Energy Savers [EERE]

    Department of Energy Notice of Adoption of FERC Final Environmental Impact Statement EIS-0488: Notice of Adoption of FERC Final Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the Department of Energy's adoption of the Federal Energy Regulatory Commission's Cameron Liquefaction Project, Cameron Parish, Louisiana Final Environmental Impact Statement. PDF icon EIS-0488-FEIS-DOEAdoption-2014.pdf More Documents & Publications EIS-0447: EPA

  7. EIS-0468: EPA Notice of Availability of the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 8: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0468: EPA Notice of Availability of the Final Environmental Impact Statement American Centrifuge Plant, Piketon, OH EIS No. 20110153, Final EIS, DOE, OH, ADOPTION-American Centrifuge Plant, Gas Centrifuge Uranium Enrichment Facility, Construction, Operation, and Decommission, License Issuance, Piketon, OH, Review Period Ends: 06/20/2011, Contact: Mathew McMillen 202-586-7248. U.S.

  8. EIS-0361: EPA Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy 1: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Final Environmental Impact Statement Western Greenbrier Co-Production Demonstration Project PDF icon Notices of Availability Western Greenbrier Co-Production Demonstration Project Final Environmental Impact Statement DOE/EIS-0361 (72FR63579) (11/09/07) More Documents & Publications EIS-0361: EPA Notice of Availability of the Draft

  9. EIS-0403: DOE and BLM Notice of Availability of the Final Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Solar Energy Development in Six Southwestern States (Final Programmatic EIS) (BLMDES 11-49, DOEEIS-0403) and associated Proposed BLM Resource Management Plan (RMP)...

  10. EIS-0458: EPA Notice of Availability of Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Final EPA/EIS No. 20110087, Topaz Solar Farm Project, Issuing a Loan Guarantee to Royal Bank of Scotland for Construction and Startup, San Luis Obispo County, CA

  11. EIS-0423-S1: Final Supplemental Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    when making long-term elemental mercury management and storage decisions. EIS-0423-S1-FEIS-Summary-2013.pdf EIS-0423-S1-FEIS-2013.pdf More Documents & Publications...

  12. EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy -S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury EPA announces the availability of the Final Supplemental Environmental Impact Statement for Long-Term Management and Storage of Elemental Mercury. Download Document PDF icon EIS-0423-S1: EPA Notice of Availability of Final

  13. EIS-0226: DOE Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy . PDF icon EIS-0226-FEIS-NOA-2010.pdf More Documents & Publications EIS-0226: DOE Notice of Availability of the Final Environmental Impact Statement EIS-0226: DOE Notice of Availability of the Revised Draft Environmental Impact Statement Probabilistic Modeling and Phase 2 Decision Making at the West Valley Demonstration Project and the Western New York Nuclear Service Center

  14. EIS-0440: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quartzsite Solar Energy Project, La Paz County, AZ EPA announces the availability of the Quartzsite Solar Energy Project, La Paz County, AZ FEIS. This EIS evaluates the ...

  15. EIS-0349: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This EIS assesses the existing natural and built environment, evaluates the potential ... Alternative project sites, power-generating and pollution-control technologies, and the No ...

  16. EIS-0408: EPA Notice of Availability of a Final Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plains Wind Energy Programmatic EIS Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, announced the availability of the Upper...

  17. EIS-0498: Notice of Availability for the Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    The EIS also analyzes the potential environmental impacts of the proposed Lake Charles Expansion Project, which would reconfigure an existing pipeline system to serve the LNG ...

  18. EIS-0319: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    TA-18 Relocation EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with this proposed action at the following DOE sites: (1) a different...

  19. EIS-0357: EPA Notice of Availability of the Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Gilberton Coal-to-Clean Fuels and Power Project, DOEEIS-0357 (November 2007) 72 FR 62229 More Documents & Publications EIS-0394: EPA Notice of Availability of the Draft...

  20. Tank Closure & Waste Management (DOE/EIS-0391) FINAL - Hanford...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Documents Environmental NEPA - Environmental Impact Statements Tank Closure & Waste Management EIS 2012 Documents CERCLA Five-Year Review NEPA - Categorical Exclusions NEPA -...

  1. EIS-0365: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    of Findings EIS-0365: Notice of Intent to Prepare an Environmental Impact Statement and to Conduct Public Scoping Meetings and Notice of Floodplain and Wetlands Involvement...

  2. EIS-0435: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement Groton Generation Station Interconnection Agreement, Brown County, South Dakota PDF icon DOE%20EIS%2004352.pdf More Documents & Publications...

  3. EIS-0423: EPA Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy EPA Notice of Availability of the Final Environmental Impact Statement EIS-0423: EPA Notice of Availability of the Final Environmental Impact Statement Long -Term Management and Storage of Elemental Mercury Storage Project, Designate a Facility or Facilities for Mercy Storage, Seven Alternative Sites, Colorado, Idaho, Missouri, Nevada, South Carolina, and Washington Download Document PDF icon EIS-0423: EPA Notice of Availability of the Final Environmental

  4. EIS-0450: BLM and WAPA Notice of Availability of a Final Environmental

    Energy Savers [EERE]

    Impact Statement | Department of Energy 50: BLM and WAPA Notice of Availability of a Final Environmental Impact Statement EIS-0450: BLM and WAPA Notice of Availability of a Final Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada The Bureau of Land Management and Western Area Power Administration, as joint lead agencies, announced the availability of a final EIS that evaluates the potential environmental impacts of granting a

  5. EIS-0423: EPA Notice of Availability of the Final Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 23: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0423: EPA Notice of Availability of the Final Environmental Impact Statement Long -Term Management and Storage of Elemental Mercury Storage Project, Designate a Facility or Facilities for Mercy Storage, Seven Alternative Sites, Colorado, Idaho, Missouri, Nevada, South Carolina, and Washington Download Document PDF icon EIS-0423: EPA Notice of Availability of the Final Environmental

  6. EIS-0408: DOE Notice of Availability of a Final Programmatic Environmental

    Office of Environmental Management (EM)

    Impact Statement | Department of Energy DOE Notice of Availability of a Final Programmatic Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Final Programmatic Environmental Impact Statement Upper Great Plains Wind Energy Programmatic EIS Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, announced the availability of the Upper Great Plains Wind Energy Final Programmatic Environmental Impact Statement. PDF icon

  7. EIS-0450: EPA Notice of Availability of a Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy EPA Notice of Availability of a Final Environmental Impact Statement EIS-0450: EPA Notice of Availability of a Final Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada EPA announced the availability of a final EIS, prepared by Western Area Power Administration and the Bureau of Land Management as joint lead agencies, that evaluates the potential environmental impacts of granting a right-of-way for the

  8. EIS-0474: BLM-WAPA Notice of Availability of Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy BLM-WAPA Notice of Availability of Final Environmental Impact Statement EIS-0474: BLM-WAPA Notice of Availability of Final Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico The Bureau of Land Management and Western Area Power Administration announced the availability of a final EIS that evaluates the potential environmental impacts of the proposed Southline Transmission Project and addresses associated potential land

  9. EIS-0458: DOE Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA PDF icon EIS-0458-NOA-FEIS-20110.pdf More Documents &...

  10. EIS-0408: DOE Notice of Availability of a Final Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Upper Great Plains Wind Energy Programmatic EIS Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, announced the availability of the ...

  11. EIS-0459: DOE Notice of Availability of Final Programmatic Environment...

    Broader source: Energy.gov (indexed) [DOE]

    under the Hawaii Clean Energy Initiative to meet 70% of the State's energy needs by 2030 through energy efficiency and renewable energy. EIS-0459-FEIS-DOE-NOA-2015.pdf More...

  12. EIS-0403: EPA Notice of Availability of the Final Programmatic...

    Broader source: Energy.gov (indexed) [DOE]

    U.S. Department of Energy and the U.S. Department of the Interior's Bureau of Land Management are Joint Lead Agencies. EIS-0403-EPA-NOA-FEIS-2012.pdf More Documents & Publications...

  13. EIS-0349: EPA Notice of Availability of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy EPA Notice of Availability of the Final Environmental Impact Statement EIS-0349: EPA Notice of Availability of the Final Environmental Impact Statement BP Cherry Point Cogeneration Project, Whatcom County, Washington BP West Coast Products, LLC proposes to construct and operate a 720-megawatt, natural-gas-fired, combined-cycle cogeneration facility on land adjacent to its BP Cherry Point Refinery. This EIS assesses the existing natural and built environment,

  14. EIS-0440: DOE Notice of Availablity of the Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy DOE Notice of Availablity of the Final Environmental Impact Statement EIS-0440: DOE Notice of Availablity of the Final Environmental Impact Statement DOE announces the availability of the Quartzsite Solar Energy Project, La Paz County, AZ FEIS. This EIS evaluates the environmental impacts of interconnecting a proposed 100-megawatt concentrating solar power plant to Western's Bouse-Kofa 161-kilovolt transmission line. The proposal includes amending the Bureau

  15. EIS-0440: EPA Notice of Availability of a Final Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy EPA Notice of Availability of a Final Environmental Impact Statement EIS-0440: EPA Notice of Availability of a Final Environmental Impact Statement Quartzsite Solar Energy Project, La Paz County, AZ EPA announces the availability of the Quartzsite Solar Energy Project, La Paz County, AZ FEIS. This EIS evaluates the environmental impacts of interconnecting a proposed 100-megawatt concentrating solar power plant to Western's Bouse-Kofa 161-kilovolt transmission

  16. EIS-0288: Consolidated Record of Decision (EIS-0270 & EIS-0271) |

    Office of Environmental Management (EM)

    Department of Energy Consolidated Record of Decision (EIS-0270 & EIS-0271) EIS-0288: Consolidated Record of Decision (EIS-0270 & EIS-0271) Tritium Supply and Recycling (EIS-0288) (EIS-0270) (EIS-0271) PDF icon Consolidated Record of Decision for Tritium Supply and Recycling (EIS-0288) (EIS-0270) (EIS-0271) (May 1999) More Documents & Publications EIS-0161: Consolidated Record of Decision EIS-0288: Final Environmental Impact Statement EIS-0288: Draft Environmental Impact Statement

  17. EIS-0263: Interior Columbia Basin Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    The ICBEMP strategy will include direction which will protect and enhance aquatic ecosystems for anadromous fish and inland native trout and terrestrial ecosystems. It will also address the social and economic interactions with these biological variables. (Merged with EIS-262 to become Eastside Ecosystem Management, Washington and Oregon)

  18. Final SPD Supplemental EIS Master Reference List | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration SPD Supplemental EIS Master Reference List | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo

  19. EIS-0427: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of a Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona EPA announces the availability of the Final...

  20. Property:NEPA EA EIS Report | Open Energy Information

    Open Energy Info (EERE)

    On Line Appendicies Volume.pdf +, ... S San Juan Basin EC + SJBEC DraftEIS.pdf + Sigurd Red Butte No2 + USFS SRB ROD 2012.pdf +, BLM SRB ROD 2012.pdf + Southline Transmission Line...

  1. EIS-0288-S1: EPA Notice of Availability of Final Supplemental Environmental

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Impact Statement | Department of Energy 88-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement EIS-0288-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor EPA announces the availability of the Production of Tritium in a Commercial Light Water Reactor (CLWR) Final Supplemental Environmental Impact Statement. For more information: http://energy.gov/node/299827. PDF icon

  2. EIS-0250-S1: Notice of Intent to Prepare a Supplement to the Final

    Office of Environmental Management (EM)

    Environmental Impact Statement | Department of Energy Notice of Intent to Prepare a Supplement to the Final Environmental Impact Statement EIS-0250-S1: Notice of Intent to Prepare a Supplement to the Final Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada Notice of Intent to prepare a Supplement to the Final Environmental Impact Statement for a Geologic Repository for the Disposal

  3. EIS-0464: EPA Notice of Availability of Final Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Final Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas EPA...

  4. EIS-0325: Final Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Washington. This project would increase transmission system capacity north of Hanford. Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, DOE...

  5. EIS-0423: EPA Notice of Availability of the Final Environmental...

    Office of Environmental Management (EM)

    Final Environmental Impact Statement Long -Term Management and Storage of Elemental Mercury Storage Project, Designate a Facility or Facilities for Mercy Storage, Seven...

  6. EIS-0425: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of a Final Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA...

  7. EIS-0416: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Final Environmental Impact Statement Ivanpah Solar Electric Generating System The Bureau of Land Management (BLM) has received a proposal from Solar Partners I, II, IV, and...

  8. EIS-0456: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydroelectric Project (FERC No. 0456) Notice of Availability for the Final Environmental Impact Statement for the Cushman Hydroelectric Project (FERC No. 0456), Design and...

  9. EIS-0435: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement Groton Generation Station Interconnection Agreement, Brown County, South Dakota PDF icon Notice of Availability for the Final Environmental...

  10. EIS-0409: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Final Environmental Impact Statement Kemper County Integrated Gasification Combined-Cycle (IGCC) Project, Kemper County, Mississippi Kemper County Integrated...

  11. Final SPD Supplemental EIS Master Reference List | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Office of General Counsel National Environmental Policy Act (NEPA) NEPA Reading Room Surplus Plutonium Disposition Supplemental Environmental Impact Statement Final SPD...

  12. EIS-0281: Final Site-Wide Environmental Impact Statement | Department of

    Energy Savers [EERE]

    Energy Final Site-Wide Environmental Impact Statement EIS-0281: Final Site-Wide Environmental Impact Statement Sandia National Laboratories/New Mexico DOE proposes to continue operating the Sandia National Laboratories/New Mexico (SNL/NM) located in central New Mexico. The DOE has identified and assessed three alternatives for the operation of SNL/NM: (1) No Action, (2) Expanded Operations, and (3) Reduced Operations. The Expanded Operations Alternative is the DOE's preferred alternative

  13. DOE/EIS-0485 Final Environmental Impact Statement Grande Prairie Wind Farm

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm Holt County, Nebraska December 2014 COVER SHEET LEAD FEDERAL AGENCY: U.S. Department of Energy (DOE), Western Area Power Administration (Western) TITLE: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska, DOE/EIS- 0485 CONTACT: For additional information on this Final Environmental Impact Statement (FEIS), contact: Matt Marsh Environmental Protection Specialist Western Area Power

  14. EIS-0250-S1: Final Supplemental Environmental Impact Statement for a

    Office of Environmental Management (EM)

    Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada | Department of Energy 50-S1: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada EIS-0250-S1: Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level

  15. EIS-0387: Final Site-Wide Environmental Impact Statement | Department of

    Office of Environmental Management (EM)

    Energy 7: Final Site-Wide Environmental Impact Statement EIS-0387: Final Site-Wide Environmental Impact Statement Y-12 National Security Complex Project, Oak Ridge, TN NNSA, a separately organized agency within DOE, is responsible for maintaining the safety, reliability, and security of the U.S. nuclear weapons stockpile to meet national security requirements. NNSA manages nuclear weapons programs and facilities, including those at the Y-12 National Security Complex (Y-12) at Oak Ridge,

  16. EIS-0026; Waste Isolation Pilot Plant Disposal Phase Final Supplementa...

    Office of Environmental Management (EM)

    by calling 1 (800) 336-9477 COVER SHEET Lead Agency: U.S. Department of Energy Title: Waste Isolation Pilot Plant Disposal Phase Final Supplemental Environmental Impact Statement...

  17. EIS-0473: EPA Notice of Availability of a Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Availability of a Final Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EPA Notice of...

  18. EIS-0283-S2: Final Supplemental Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    Statement This Final SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which a disposition...

  19. EIS-0283-S2: EPA Notice of Availability of the Final Supplemental

    Broader source: Energy.gov (indexed) [DOE]

    Environmental Impact Statement | Department of Energy Disposition Supplemental Environmental Impact Statement EPA announced the availability of a final supplemental EIS that evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which a disposition path is not assigned, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007

  20. DOE/EIS-0099=F Final Environm�ntal Impact Stat�m�nt

    Office of Environmental Management (EM)

    =F Final Environm�ntal Impact Stat�m�nt REMEDIAL ACTIONS AT THE FORMER VITRO CHEMICAL COMPANY SITE SOUTH SALT LAKE, SALT LAKE COUNTY UTAH VOLUME II - APPENDICES July. 1984 U.S. DEPARTMENT OF ENERGY DOE/EIS-0099-F Final Environmental Impact Statement REMEDIAL ACTIONS AT THE FORMER VITRO CHEMICAL COMPANY SITE SOUTH SALT LAKE, SALT LAKE COUNTY UTAH VOLUME II - ^mmENaICES gulyI= 1984 U.S. abm^oqjbkq= OF ENERGY KKKKKKK= JJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJJ Append ix A Site Concept ual De s i g n A

  1. EIS-0287: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement, EIS-0287 (September 2002)

    Broader source: Energy.gov [DOE]

    This EIS analyzes the potential environmental consequences of alternatives for managing high-level waste (HLW) calcine, mixed transuranic waste/sodium bearing waste (SBW) and newly generated liquid...

  2. EIS-0340: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0340-NOI-2001.pdf More Documents & Publications EIS-0340: Draft Environmental Impact Statement EIS-0340: Record of Decision EIS-0340: Final Environmental Impact Statement...

  3. EIS-0189: Notice of Intent | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Final Environmental Impact Statement (TWRS EIS, DOEEIS-0189, August 1996). EIS-0189-S1-NOI-20020.pdf More Documents & Publications EIS-0286: Notice of Revised Scope EIS-0356:...

  4. File:09-FD-g - USFS NEPA Process.pdf | Open Energy Information

    Open Energy Info (EERE)

    g - USFS NEPA Process.pdf Jump to: navigation, search File File history File usage Metadata File:09-FD-g - USFS NEPA Process.pdf Size of this preview: 463 599 pixels. Other...

  5. Final EIS for Decommissioning and/or Long-Term Stewardship at the WVDP and Western New York Nuclear Service Center

    Office of Environmental Management (EM)

    DOE/EIS-0226 January 2010 Final Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center A Summary and Guide for Stakeholders The West Valley Site Availability of the Final EIS for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center For further information on this Final EIS, or to request a copy of the EIS or

  6. EIS-0288; Final Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor

    National Nuclear Security Administration (NNSA)

    iii COVER SHEET Responsible Agency: United States Department of Energy Cooperating Agency: Tennessee Valley Authority Title: Final Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor Contact: For additional information on this Final Environmental Impact Statement, write or call: Jay Rose Office of Defense Programs U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Attention: CLWR EIS Telephone: (202) 586-5484 For copies of the

  7. EIS-0202: Umatilla Basin Project Planning Report and Final Environmental Report

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposed support for the Bureau of Reclamation proposal to assist in restoration of the Umatilla River anadromous fishery.

  8. EIS-0287: Idaho High-Level Waste and Facilities Disposition Final...

    Office of Environmental Management (EM)

    wastesodium bearing waste (SBW) and newly generated liquid waste at the Idaho National Engineering and Environmental Laboratory (INEEL) in liquid and solid forms. This EIS also...

  9. DOE/EIS-0281; Sandia National Laboratories/New Mexico Final Site-Wide Environmental Impact Statement, October 1999

    Office of Environmental Management (EM)

    here to return to the Main Menu Volume I, Chapters 1-15 Volume II, Appendixes A- H Volume III, Comments and Responses Summary Contacts SANDIA NA TIONAL LABORA TORIES/NEW MEXICO FINAL SITE-WIDE ENVIRONMENTAL IMPACT STA TEMENT Summary COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY (DOE) COOPERATING AGENCY: U.S. AIR FORCE TITLE: Final Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (DOE/EIS-0281) CONTACT: For further information concerning the Final

  10. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 1, 2012 EIS-0457: Final Environmental Impact Statement Albany-Eugene Rebuild Project, Lane and Linn Counties, OR February 8, 2012 EIS-0476: Final Environmental Impact...

  11. DOE/EIS-0281; Sandia National Laboratories/New Mexico Final Site-Wide Environmental Impact Statement, October 1999

    Office of Environmental Management (EM)

    I, Chapters 1-15 Volume II, Appendixes A- H Volume III, Comments and Responses Summary Contacts SANDIA NA TIONAL LABORA TORIES/NEW MEXICO FINAL SITE-WIDE ENVIRONMENTAL IMPACT STA TEMENT Click here to return to the Main Menu Comments and Responses COVER SHEET RESPONSIBLE AGENCY: U.S. DEPARTMENT OF ENERGY (DOE) COOPERATING AGENCY: U.S. AIR FORCE TITLE: Final Site-Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico (DOE/EIS-0281) CONTACT: For further information

  12. EIS-0283: Amended Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    b.pdf More Documents & Publications EIS-0229: Record of Decision (November 2003) EIS-0229-SA-03: Supplement Analysis EIS-0283: Final

  13. DOE/EIS-0288-S1 Final Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor, Summary

    National Nuclear Security Administration (NNSA)

    Final Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor Summary U.S. Department of Energy National Nuclear Security Administration DOE/EIS-0288-S1 February 2016 ACRONYMS AND ABBREVIATIONS CFR Code of Federal Regulations CLWR commercial light water reactor CRD Comment Response Document DOE U.S. Department of Energy EIS environmental impact statement EPA U.S. Environmental Protection Agency FR Federal Register NEPA National Environmental

  14. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 15, 2015 EIS-0485: Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska January 8, 2015 EIS-0481: Draft Programmatic...

  15. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 1, 2003 EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management April 1, 2003 EIS-0312: Final Environmental Impact Statement Fish...

  16. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0218: Final Environmental Impact Statement Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel January 1, 1996 EIS-0214:...

  17. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 22, 2006 EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project August 1, 2006 EIS-0383: Draft Environmental Impact Statement...

  18. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership September 1, 2008 EIS-0399: Final Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line August 29, 2008 EIS-0370: Draft...

  19. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (FERC Project No. 460) September 17, 2010 EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project August 27, 2010 EIS-0455: Final Environmental...

  20. EIS-0283: Amended Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    EIS-0283-AmROD-2003a.pdf More Documents & Publications EIS-0229: Amended Record of Decision (April 2002) EIS-0283: Amended Record of Decision EIS-0283-S2: Final Supplemental Environmental Impact Statement

  1. Title Final EIS: Proposed Public Land Withdraw!: Nellis Air Force Bombing Range: Nye, Clark &

    National Nuclear Security Administration (NNSA)

    EIS: Proposed Public Land Withdraw!: Nellis Air Force Bombing Range: Nye, Clark & Lincoln Counties, NV. Author US Dept. of the Interior 101271 Document Date ERC Index number 7/27/79 05.09.315 Document Type Box Number Report 1712-1 Recipients General Public ntcil ?i:^->^*-w^fiw«^sft|^^s^^^- Ao iScSslffiSS^tel'SStSSJ: ;;- 'Sa^BVv^ 1 i?' ;^^^^¥r^^i^^^ 5^£ ^ tfg ^SW^^W'^W*-^ MANAGEMENT 'e^^.i^.yrA-/-.:-;'i'«r-i.:^j^;i.^^V^iMS^^; n --.TJV.7tT^i''. i .--^ SfS*WiP«^«^»!E««©S^i|gSR:S

  2. EIS-0340: Record of Decision | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    40-ROD-2005.pdf More Documents & Publications EIS-0340: Draft Environmental Impact Statement EIS-0340: Final Environmental Impact Statement EA-1173: Final Environmental Assessment...

  3. EIS-0007: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    07: Draft Environmental Impact Statement EIS-0007: Draft Environmental Impact Statement Low-BTU Coal Gasification Facility and Industrial Park PDF icon EIS-0007-DEIS.pdf More Documents & Publications EIS-0099: Final Environmental Impact Statement EIS-0093: Final Environmental Impact Statement EIS-0116: Final

  4. EIS-0143: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    3: Draft Environmental Impact Statement EIS-0143: Draft Environmental Impact Statement Eugene-Springfield Area Planning Project PDF icon EIS-0143-DEIS.pdf More Documents & Publications EIS-0093: Final Environmental Impact Statement EIS-0112: Final Environmental Impact Statement EIS-0125: Final Environmental Impact Statement

  5. EIS-0433-S1: EPA Notice of Availability of Final Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Availability of Final Supplemental Environmental Impact Statement Keystone XL Pipeline SEIS (Montana, South Dakota, and Nebraska) EPA announces the availability of the...

  6. Travis Brown and Kamran Baksh, Final Submission | OpenEI Community

    Open Energy Info (EERE)

    Travis Brown and Kamran Baksh, Final Submission Home > Groups > 2014 Geothermal Case Study Challenge CSM's picture Submitted by CSM(5) Member 14 May, 2014 - 21:59 Colorado School...

  7. EIS-0026-S-2; Waste Isolation Pilot Plant Disposal Phase Final...

    Office of Environmental Management (EM)

    by calling 1 (800) 336-9477 COVER SHEET Lead Agency: U.S. Department of Energy Title: Waste Isolation Pilot Plant Disposal Phase Final Supplemental Environmental Impact Statement...

  8. EIS-0408: EPA Notice of Availability of a Final Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Western Area Power Administration and the U.S. Fish and Wildlife Service, as joint lead agencies, announced the availability of the Upper Great Plains Wind Energy Final Programmatic Environmental Impact Statement.

  9. EIS Distribution

    Broader source: Energy.gov [DOE]

    This DOE guidance presents a series of recommendations related to the EIS distribution process, which includes creating and updating a distribution list, distributing an EIS, and filing an EIS with the EPA.

  10. Microsoft Word - TCWM EIS Final Press Release (12-5-2012).docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OFFICE OF RIVER PROTECTION NUCLEAR WASTE PROGRAM RICHLAND, WA 99352 RICHLAND, WA 99352 NEWS MEDIA CONTACTS: FOR IMMEDIATE RELEASE Carrie Meyer, DOE (509) 376-0810 December 5, 2012 Carrie_C_Meyer@orp.doe.gov Erika Holmes, Ecology (509) 372-7880 Erika.Holmes@ecy.wa.gov Issuance of the Final Tank Closure and Waste Management Environmental Impact Statement Richland, WA - The U.S. Department of Energy (DOE) is issuing its Final Tank Closure and Waste Management Environmental Impact Statement Hanford

  11. Analysis of FERC's Final EIS for Electricity Open Access & Recovery of Stranded Costs

    Reports and Publications (EIA)

    1996-01-01

    Reviews the Final Environmental Impact Statement (FEIS) prepared by the Federal Energy Regulatory Commission for its electricity transmission system open access prepared in April 1996 and uses the National Energy Modeling System (NEMS) to analyze the open access rule (Orders 888 and 889).

  12. EIS-0129: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    9: Draft Environmental Impact Statement EIS-0129: Draft Environmental Impact Statement New England/Hydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-DEIS.pdf More Documents & Publications EIS-0129: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement EIS-0125

  13. EIS-0070: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    0: Draft Environmental Impact Statement EIS-0070: Draft Environmental Impact Statement Mining, Construction and Operation for a Full-size Module at the Anvil Points Oil Shale Facility, Rifle, Garfield County, Colorado PDF icon EIS-0070-DEIS.pdf More Documents & Publications EIS-0068: Final Environmental Impact Statement EIS-0098: Final Environmental Impact Statement EIS-0073

  14. EIS-0370: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0370: Draft Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Draft Environmental Impact Statement More Documents & Publications EIS-0370: Final Environmental Impact Statement EIS-0370: Bureau of Reclamation, Interior, Notice of Availability of the Final Environmental Impact Statement EIS-0400: Draft

  15. BLM issues final EIS for Tract C-a offsite lease

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    In October, 1986, the US Bureau of Land Management, White River Resource Area, issued the Final Environmental Impact Statement concerning Rio Blanco Oil Shale Company's request to lease an offtract site for disposal of overburden and spent shale from Tract C-a. A major issue which pitted Rio Blanco Oil Shale Company against many other members of the oil shale community was the covering up of oil shale resources on 84 Mesa. The oil shale resource under 84 Mesa may contain as much oil in place as Tract C-a itself. Some of the significant points concerning this issue are discussed. A summary of environmental consequences is given. 5 figures.

  16. EIS-0407: Abengoa Biomass Bioenergy Project near Hugoton, Stevens...

    Office of Environmental Management (EM)

    07: Abengoa Biomass Bioenergy Project near Hugoton, Stevens County, KS EIS-0407: Abengoa Biomass Bioenergy Project near Hugoton, Stevens County, KS August 20, 2010 EIS-0407: Final...

  17. EIS-0448: First Solar Desert Sunlight Project in Riverside County...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: First Solar Desert Sunlight Project in Riverside County, CA EIS-0448: First Solar Desert Sunlight Project in Riverside County, CA June 24, 2011 EIS-0448: Final Environmental...

  18. EIS-0415: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    South Dakota For more information, see the project page: http:energy.govnode302023. EIS-0415-DEIS-2010.pdf More Documents & Publications EIS-0478: Final Environmental Impact...

  19. EIS-0423: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Impact Statement, DOEEIS-0423D (January 2010) More Documents & Publications EIS-0423-S1: Draft Supplemental Environmental Impact Statement EIS-0423: Final Environmental Impact...

  20. EIS-0380: Notice of Intent to Prepare a Supplemental Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    SWEIS originally proposed. EIS-0380-NOI-2005.pdf More Documents & Publications EIS-0238-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement to the Final...

  1. EIS-0447: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental...

  2. EIS-0361: Record of Decision and Floodplain Statement of Findings...

    Broader source: Energy.gov (indexed) [DOE]

    Statement EIS-0361: Final Environmental Impact Statement EIS-0361: Notice of Intent to Prepare an Environmental Impact Statement and Notice of FloodplainWetlands Involvement...

  3. EIS-0468: American Centrifuge Plant in Piketon, OH | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: American Centrifuge Plant in Piketon, OH EIS-0468: American Centrifuge Plant in Piketon, OH May 20, 2011 EIS-0468: Final Environmental Impact Statement Proposed American...

  4. DOE/EIS-0355 Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Final Environmental Impact Statement (July 2005)

    SciTech Connect (OSTI)

    N /A

    2005-08-05

    The U.S. Department of Energy (DOE or the Department) is proposing to clean up surface contamination and implement a ground water compliance strategy to address contamination that resulted from historical uranium-ore processing at the Moab Uranium Mill Tailings Site (Moab site), Grand County, Utah. Pursuant to the National Environmental Policy Act (NEPA), 42 United States Code (U.S.C.) {section} 4321 et seq., DOE prepared this environmental impact statement (EIS) to assess the potential environmental impacts of remediating the Moab site and vicinity properties (properties where uranium mill tailings were used as construction or fill material before the potential hazards associated with the tailings were known). DOE analyzed the potential environmental impacts of both on-site and off-site remediation and disposal alternatives involving both surface and ground water contamination. DOE also analyzed the No Action alternative as required by NEPA implementing regulations promulgated by the Council on Environmental Quality. DOE has determined that its preferred alternatives are the off-site disposal of the Moab uranium mill tailings pile, combined with active ground water remediation at the Moab site. The preferred off-site disposal location is the Crescent Junction site, and the preferred method of transportation is rail. The basis for this determination is discussed later in this Summary. DOE has entered into agreements with 12 federal, tribal, state, and local agencies to be cooperating agencies in the development and preparation of this EIS. Several of the cooperating agencies have jurisdiction by law and intend to use the EIS to support their own decisionmaking. The others have expertise relevant to potential environmental, social, or economic impacts within their geographic regions. During the preparation of the EIS, DOE met with the cooperating agencies, provided them with opportunities to review preliminary versions of the document, and addressed their comments and concerns to the fullest extent possible. DOE received over 1,600 comments on the draft EIS from the public, federal, state and local agencies, tribes, governors, and members of Congress. DOE has considered these comments in finalizing the EIS and has provided responses to all comments in the EIS.

  5. EIS-0471: Notice of Adoption of an Environmental Impact Statement...

    Energy Savers [EERE]

    EIS-0440: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0250-S1 and EIS-0250-S2: EPA Notice of Availability of the Draft Supplemental Environmental...

  6. EIS-0424: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    4: Draft Environmental Impact Statement EIS-0424: Draft Environmental Impact Statement Klickitat Hatchery Complex Program Download Document PDF icon EIS-0424: Draft Environmental Impact Statement More Documents & Publications EIS-0169-SA-03: Supplement Analysis EIS-0425: Draft Environmental Impact Statement EIS-0425: Final Environmental Impact Statement

  7. EIS-0015: U.S. Spent Fuel Policy

    Broader source: Energy.gov [DOE]

    Subsumed DOE/EIS-0040 and DOE/EIS-0041. The Savannah River Laboratory prepared this EIS to analyze the impacts of implementing or not implementing the policy for interim storage of spent power reactor fuel. This Final EIS is a compilation of three Draft EISs and one Supplemental Draft EIS: DOE/EIS-0015-D, Storage of U.S. Spent Power Reactor Fuel; DOE/EIS-0015-DS, Storage of U.S. Spent Power Reactor Fuel - Supplement; DOE/EIS-0040-D, Storage of Foreign Spent Power Reactor Fuel; and DOE/EIS-0041-D, Charge for Spent Fuel Storage.

  8. The EIS Comment-Response Process | Department of Energy

    Energy Savers [EERE]

    The EIS Comment-Response Process The EIS Comment-Response Process This DOE guidance presents a series of recommendations to lead those involved in the preparation and review of a final EIS. The guidance addresses both the substance and the mechanics of the comment-response process and provides advice on tracking and categorizing comments, considering comments and preparing responses, and presenting responses and corresponding changes in a final EIS. PDF icon The EIS Comment-Response Process More

  9. DOE-EIS-0218F Final Environmental Impact Statement on a Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel (February 1996)

    National Nuclear Security Administration (NNSA)

    United States Department of Energy Assistant Secretary for Environmental Management Washington, DC 20585 DOE/EIS-0218F February 1996

  10. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Disposition July 24, 2012 EIS-0403: Final Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States (AZ, CA, CO, NV, NM, and UT) May 31,...

  11. DOE/EIS-0283-S2

    Office of Environmental Management (EM)

    DOE/EIS-0283-S2 April 2015 Volume 2 (Appendices A through L) Final Surplus Plutonium Disposition Supplemental Environmental Impact Statement U.S. Department of Energy Office of Material Management and Minimization and Office of Environmental Management Washington, DC AVAILABILITY OF THE FINAL SURPLUS PLUTONIUM DISPOSITION SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT (SPD Supplemental EIS) For further information on this SPD Supplemental EIS, or to request a copy, please contact: Sachiko McAlhany,

  12. DOE/EIS-0283-S2

    National Nuclear Security Administration (NNSA)

    DOE/EIS-0283-S2 April 2015 Volume 2 (Appendices A through L) Final Surplus Plutonium Disposition Supplemental Environmental Impact Statement U.S. Department of Energy Office of Material Management and Minimization and Office of Environmental Management Washington, DC AVAILABILITY OF THE FINAL SURPLUS PLUTONIUM DISPOSITION SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT (SPD Supplemental EIS) For further information on this SPD Supplemental EIS, or to request a copy, please contact: Sachiko

  13. EIS-0116-S1: Final Supplemental Environmental Impact Statement for the Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project, Grand and Summit Counties, Colorado

    Broader source: Energy.gov [DOE]

    This supplemental environmental impact statement by the Western Area Power Administration assesses the environmental effects of constructing, operating, and maintaining about 30 miles of 230/345-kV transmission line between the existing Gore Pass Substation northwest of Kremmling, Colorado, and a proposed new substation (not part of this action) near the Ute Pass Road. Alternatives assessed included routing and design alternatives plus the alternatives addressed in the Hayden-Blue River Final EIS, issued by the Rural Electrification Administration in July 1982 and adopted by DOE in June 1985 (see DOE/EIS-0116).

  14. EIS-0470: Cape Wind Energy Project, Nantucket Sound, Offshore of

    Office of Environmental Management (EM)

    Massachusetts | Department of Energy 0: Cape Wind Energy Project, Nantucket Sound, Offshore of Massachusetts EIS-0470: Cape Wind Energy Project, Nantucket Sound, Offshore of Massachusetts June 25, 2014 EIS-0470: Cape Wind Energy Project, Final General Conformity Determination Cape Wind Energy Project, Final General Conformity Determination, June 23, 2014 December 21, 2012 EIS-0470: Final Environmental Impact Statement Cape Wind Energy Project, Nantucket Sound, MA December 31, 2012 EIS-0470:

  15. EIS-0451: Record of Decision | Department of Energy

    Energy Savers [EERE]

    1: Record of Decision EIS-0451: Record of Decision Hooper Springs Transmission Project, Caribou County, Idaho DOE's Bonneville Power Administration issued a Record of Decision and Mitigation Action Plan for the Hooper Springs Transmission Project. PDF icon EIS-0451-ROD-MAP-2015.pdf More Documents & Publications EIS-0451: Supplemental Draft Environmental Impact Statement EIS-0451: Final Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement

  16. EIS-0082-S1: Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    S1: Record of Decision EIS-0082-S1: Record of Decision Defense Waste Processing Facility, Savannah River Site, Aiken, South Carolina For more information, see the project page: http://energy.gov/node/1191601. PDF icon EIS-0082-S1-ROD-1995.pdf More Documents & Publications EIS-0082: Record of Decision EIS-0082-S2: Final Supplemental Environmental Impact Statement EIS-0082-S2: Record of Decision

  17. EIS-0222: Draft Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0222: Draft Environmental Impact Statement Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan This EIS evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years. PDF icon EIS-0222-DEISExecutiveSummary-1999.pdf More Documents & Publications EIS-0222: Final Environmental Impact Statement EIS-0222: Record of

  18. EIS-0470: EPA Amended Notice of Adoption | Department of Energy

    Office of Environmental Management (EM)

    0: EPA Amended Notice of Adoption EIS-0470: EPA Amended Notice of Adoption Cape Wind Energy Project in Nantucket Sound, Massachusetts The Environmental Protection Agency's Notice of DOE's additional 30-day review period for DOE/EIS-0470 was published in the Federal Register on February 8, 2013. PDF icon EIS-0470-AmendedNoticeofAdoption-2013.pdf More Documents & Publications EIS-0470: EPA Notice of Adoption of the Final Environmental Impact Statement EIS-0426: EPA Notice of Availability of

  19. EIS0250F_Volume1_part2.pdf | Department of Energy

    Office of Environmental Management (EM)

    EIS0250F_Volume1_part2.pdf EIS0250F_Volume1_part2.pdf PDF icon EIS0250F_Volume1_part2.pdf More Documents & Publications EIS-0250-S1: Final Supplemental Environmental Impact Statement crd title p1.ai EIS-0250-S1: Draft Supplemental Environmental Impact Statement

  20. EIS-0370: Bureau of Reclamation, Interior, Notice of Availability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bureau of Reclamation, Interior, Notice of Availability of the Final Environmental Impact Statement EIS-0370: Bureau of Reclamation, Interior, Notice of Availability of the Final...

  1. EIS-0226: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    6-R-NOI-2003.pdf More Documents & Publications EIS-0226: Notice of Intent to Prepare an Environmental Impact Statement EIS-0226: DOE Notice of Availability of the Final...

  2. EIS-0471: Notice of Adoption of an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: Notice of Adoption of an Environmental Impact Statement EIS-0471: Notice of Adoption of an Environmental Impact Statement Eagle Rock Enrichment Facility in Bonneville County, Idaho Download Document PDF icon EIS-0471: Notice of Adoption of an Environmental Impact Statement More Documents & Publications EIS-0468: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0440: EPA Notice of Availability of a Final Environmental Impact Statement

  3. EIS-0306: Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    Record of Decision EIS-0306: Record of Decision Treatment and Management of Sodium-Bonded Spent Nuclear Fuel DOE has issued a Final Environmental Impact Statement for the Treatment and Management of Sodium-Bonded Spent Nuclear Fuel (final EIS) 65 FR 47987, August 4, 2000) (DOE/EIS-0306, July 2000). After careful consideration of public comments on the draft EIS and programmatic, environmental, nonproliferation, and cost issues, DOE has decided to implement the preferred alternative identified in

  4. EIS-0308-SA-01: Supplement Analysis | Department of Energy

    Office of Environmental Management (EM)

    -SA-01: Supplement Analysis EIS-0308-SA-01: Supplement Analysis Southpoint Power Project The Calpine Corporation applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Parker-Davis project in western Arizona. PDF icon DOE/EIS-0308-SA-1: Supplement Analysis Southpoint Power Project (March 1999) More Documents & Publications EIS-0308: Record of Decision and Floodplain Statement EIS-0308: Final Environmental Impact Statement EA-1685: Final

  5. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statements (EIS) Environmental Impact Statements (EIS) Environmental Impact Statements are detailed written statements that are required by section 102(2)(C) of NEPA for a proposed major Federal action significantly affecting the quality of the human environment. If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. DOCUMENTS AVAILABLE FOR DOWNLOAD December 18, 2015 EIS-0393: Final Environmental Impact Statement Montanore

  6. DOE/EIS-006

    Office of Environmental Management (EM)

    file= Final Environmentl Impact Statement (Final Statement to ERDA 1545-D) Roky Flats Plant Site Golden, Jeferson Count, Colorado U.S. DEPARTMENT OF ENERGY APRil 1980 Volume 1 of 3 Available from: National Technical Information Service (NTIS) U.S. Department of Comerce 5285 Port Royal Road Springfield, Virginia 22161 Price: Printed Copy: Hicrofiche: $22.50 $22.50 Sold only as P= volume sets DOE/EIS-006 r`JOINN= cin~l= bnvironmental= fmpact= ptatement= Ecin~l= ptatement=to= boa^= NRQRJMF=

  7. EIS-0350: Final Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory Los Alamos, New Mexico

    Broader source: Energy.gov [DOE]

    The CMRR EIS examines the potential environmental impacts associated with the Proposed Action of consolidating and relocating the mission-critical CMR capabilities from a degraded building to a new modern building(s).

  8. EIS-0063: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0063: Draft Environmental Impact Statement Waste Management Operations, Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Hanford Site, Richland, Washington PDF icon EIS-0063-DEIS.pdf More Documents & Publications EIS-0063: Final

  9. EIS-0251: Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    Record of Decision EIS-0251: Record of Decision Dry Storage Container System for the Management of Navel Spent Nuclear Fuel (January 1997) (62 FR 91095) PDF icon Record of Decision for a Dry Storage Container System for the Management of Navel Spent Nuclear Fuel (January 1997) (62 FR 91095) More Documents & Publications EIS-0203: Record of Decision EIS-0251: Record of Decision EIS-0251: Final Environmental Impact Statement

  10. EIS-0288-S1: Draft Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Draft Supplemental Environmental Impact Statement EIS-0288-S1: Draft Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Draft Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor (DOE/EIS-0288-S1) supplements DOE's 1999 Final EIS (DOE/EIS-0288), which addressed the production of tritium in Tennessee Valley Authority (TVA) reactors at Watts Bar Unit 1 in Rhea County, TN,

  11. EIS-0433: DOE Comments on the Draft Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    XL Project. Comments on the Draft Environmental Impact Statement for the Keystone XL Pipeline Project, DOEEIS-433 (July 2010) More Documents & Publications EIS-0433: Final...

  12. EIS-0229: Amended Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Decision EIS-0229: Amended Record of Decision Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic Environmental Impact Statement The U.S. Department of...

  13. EIS-0385-SA-01: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SA-01: Supplement Analysis EIS-0385-SA-01: Supplement Analysis Site Selection for the Expansion of the Strategic Petroleum Reserve Final Environmental Impact Statement Supplement...

  14. EIS-0409: Mitigation Action Plan | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Draft Environmental Impact Statement EIS-0409: Final Environmental Impact Statement Successful Field-Scale In Situ Thermal NAPL Remediation at the Young - Rainey STAR Center...

  15. EIS-0486: EPA Notice of Availability of Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    of Draft Environmental Impact Statement More Documents & Publications EIS-0433-S1: EPA Notice of Availability of Final Supplemental Environmental Impact Statement...

  16. EIS-0400: EPA Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Final Programmatic Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental...

  17. EIS-0442: EPA Notice of Availability of Draft Environmental Impact...

    Energy Savers [EERE]

    EPA Notice of Availability of the Final Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement...

  18. EIS-0388: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Notice of Intent to Prepare a Supplemental Environmental Impact Statement EIS-0238-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement to the Final...

  19. EIS-0444-SA-01: Supplement Analysis | Department of Energy

    Office of Environmental Management (EM)

    Supplement Analysis EIS-0444-SA-01: Supplement Analysis Texas Clean Energy Project (TCEP), Ector County, Texas The final supplement analysis evaluates the potential environmental...

  20. EIS-0287: Amended Record of Decision | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Record of Decision: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement EIS-0287 (November 2006) (71 FR 68811) More Documents & Publications...

  1. EIS-0277: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Management of Certain Plutonium Residues and Scrub Alloy Stored at the Rocky Flats Environmental Technology Site (the Final EIS, DOEEIS-0277F, August 1998) PDF icon Record...

  2. EIS-0417: South Mountain Freeway (Loop 202); Phoenix, Arizona...

    Broader source: Energy.gov (indexed) [DOE]

    Record of Decision September 30, 2014 EIS-0417: Final Environmental Impact Statement More Information http:azdot.govprojectsphoenix-metro-arealoop-202-south-mountain-freeway...

  3. town | OpenEI Community

    Open Energy Info (EERE)

    town Home OpenEI Community Central Description: The central OpenEI community for students, scientists, researchers, enthusiasts, analysts and developers. central OpenEI town...

  4. central | OpenEI Community

    Open Energy Info (EERE)

    central Home OpenEI Community Central Description: The central OpenEI community for students, scientists, researchers, enthusiasts, analysts and developers. central OpenEI town...

  5. New OpenEI Homepage | OpenEI Community

    Open Energy Info (EERE)

    New OpenEI Homepage Home > Groups > OpenEI Community Central Graham7781's picture Submitted by Graham7781(2017) Super contributor 18 July, 2012 - 10:02 imported OpenEI OpenEI has...

  6. The EIS Comment-Response Process (DOE, 2004)

    Broader source: Energy.gov [DOE]

    This DOE guidance presents a series of recommendations to lead those involved in the preparation and review of a final EIS. The guidance addresses both the substance and the mechanics of the comment-response process and provides advice on tracking and categorizing comments, considering comments and preparing responses, and presenting responses and corresponding changes in a final EIS.

  7. EIS-0419: Supplement Analysis | Department of Energy

    Energy Savers [EERE]

    Supplement Analysis EIS-0419: Supplement Analysis Whistling Ridge Energy Project; Skamania County, Washington Bonneville Power Administration prepared a supplement analysis and determined that there have not been substantial changes to the proposal or significant new circumstances or information relevant to environmental concerns since the August 2011 issuance of the Final EIS for the Whistling Ridge Energy Project. For more information, see the project page: http://energy.gov/node/300313. PDF

  8. EIS-0449: Solar Millennium Blythe Solar Power Project in Riverside County,

    Office of Environmental Management (EM)

    CA | Department of Energy 9: Solar Millennium Blythe Solar Power Project in Riverside County, CA EIS-0449: Solar Millennium Blythe Solar Power Project in Riverside County, CA December 10, 2010 EIS-0449: Notice of Adoption of the Final Environmental Impact Statement Blythe Solar Power Project December 10, 2010 EIS-0449: Final Environmental Impact Statement Blythe Solar Power Project

  9. EIS-0468: American Centrifuge Plant in Piketon, OH | Department of Energy

    Office of Environmental Management (EM)

    8: American Centrifuge Plant in Piketon, OH EIS-0468: American Centrifuge Plant in Piketon, OH May 20, 2011 EIS-0468: Final Environmental Impact Statement Proposed American Centrifuge Plant in Piketon, Ohio Pike County, Ohio

  10. EIS-0375: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste Download Document PDF icon EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement More Documents & Publications EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement EIS-0375: Final Environmental

  11. EIS-0082: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Record of Decision EIS-0082: Record of Decision Defense Waste Processing Facility at the Savannah River Site, Aiken, South Carolina The U.S. Department of Energy (DOE) is publishing a Record of Decision for the Defense Waste Processing Facility (DWPF). DOE has prepared and issued a Final Supplemental Environmental Impact Statement (EIS) (DOE/EIS-0082-S, November 25, 1994) to assess the potential environmental impacts of completing construction and operating the DWPF, a group of associated

  12. EIS-0285-SA-65: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    65: Supplement Analysis EIS-0285-SA-65: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Raymond - Cosmopolis Transmission Line would include danger tree removal within some areas adjacent to the right-of-way (ROW) (May 2002) PDF icon Supplement Analysis for the Transmission System Vegetation Management Program Final Environmental Impact Statement (DOE/EIS-0285/SA-65) (May 2002) More Documents & Publications EIS-0317-S1: Environmental

  13. EIS-0279: Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    Record of Decision EIS-0279: Record of Decision Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement, Aiken, South Carolina The Savannah River Site Spent Nuclear Fuel Management Environmental Impact Statement (SRS SNF Management EIS, DOE/EIS-0279, March 2000) considered alternative ways of managing spent nuclear fuel (SNF) at DOE's Savannah River Site in Aiken, South Carolina. Based on that analysis, DOE has decided to implement the Preferred Alternative

  14. EIS-0337: Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    Record of Decision EIS-0337: Record of Decision West Valley Demonstration Project Waste Management Activities In the Final West Valley Demonstration Project Waste Management Environmental Impact Statement (WVDP WM EIS, Department of Energy (DOE)/EIS-0337, December 2003), DOE considered alternatives for the management of WVDP low-level radioactive waste (LLW), mixed (radioactive and hazardous) LLW (MLLW), transuranic (TRU) waste, and high-level radioactive waste (HLW). DOE prepared the WVDP WM

  15. EIS-0407: Abengoa Biomass Bioenergy Project near Hugoton, Stevens County,

    Office of Environmental Management (EM)

    KS | Department of Energy 07: Abengoa Biomass Bioenergy Project near Hugoton, Stevens County, KS EIS-0407: Abengoa Biomass Bioenergy Project near Hugoton, Stevens County, KS August 20, 2010 EIS-0407: Final Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas October 6, 2011 EIS-0407: Record of Decision Issuance of a Loan Guarantee to Abengoa Bioenergy Biomass of Kansas, LLC for the Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas

  16. EIS-0487: EPA Notice of Availability of Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0487: EPA Notice of Availability of Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas EPA announces the availability of the Draft Environmental Impact Statement for the Freeport LNG Liquefaction Project, Brazoria County, Texas. PDF icon EIS-0487-DEIS-EPA-NOA-2014.pdf More Documents & Publications EIS-0472: EPA Notice of Availability of Final

  17. EIS-0490: Adoption Notice for an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Department of Energy 0: Adoption Notice for an Environmental Impact Statement EIS-0490: Adoption Notice for an Environmental Impact Statement Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder City, NV Western has adopted the U.S. Department of Transportation's Federal Highway Administration's Final EIS on the Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, NV. WAPA was a cooperating agency with the FHWA EIS. PDF icon

  18. OpenEI | OpenEI Community

    Open Energy Info (EERE)

    by Graham7781(2017) Super contributor 14 April, 2014 - 09:48 National Day of Civic Hacking code community data Event hacking international national OpenEI The National Day of...

  19. EIS_Summary_TextandFigures

    Office of Environmental Management (EM)

    N V I R O N M E N T A L I M P A C T S T A T E M E N T S U M M A R Y PLAINS & EASTERN CLEAN LINE TRANSMISSION PROJECT DOE/EIS-0486 Final U.S. DEPARTMENT OF ENERGY Office of Electricity Delivery and Energy Reliability Washington, DC October 2015 This page intentionally left blank. SUMMARY PLAINS & EASTERN FINAL ENVIRONMENTAL IMPACT STATEMENT S-i COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy (DOE), Office of Electricity Delivery and Energy Reliability COOPERATING

  20. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: citing Type Term Title Author...

  1. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: clean tech Type Term Title...

  2. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: clean-tech Type Term Title...

  3. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: CES Type Term Title Author...

  4. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: car Type Term Title Author...

  5. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: consumer behavior Type Term...

  6. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: 2015 Type Term Title Author...

  7. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: building load Type Term Title...

  8. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: adoption Type Term Title Author...

  9. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: compound queries Type Term...

  10. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: building load data Type Term...

  11. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: datasets Type Term Title Author...

  12. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: 2016 Type Term Title Author...

  13. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Community Central Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: dataset Type Term Title Author...

  14. EIS-0370: Bureau of Reclamation, Interior, Notice of Availability of the

    Office of Environmental Management (EM)

    Final Environmental Impact Statement | Department of Energy Bureau of Reclamation, Interior, Notice of Availability of the Final Environmental Impact Statement EIS-0370: Bureau of Reclamation, Interior, Notice of Availability of the Final Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Bureau of Reclamation, Interior, Notice of Availability of the Final Environmental Impact Statement More Documents & Publications EIS-0370: Record of

  15. EIA | OpenEI Community

    Open Energy Info (EERE)

    database on OpenEI EIA OpenEI Utility Rates OpenEI and U.S. Energy Information Administration (EIA) Good news, everyone The U.S. Energy Information Administration (EIA) now...

  16. data | OpenEI Community

    Open Energy Info (EERE)

    Contributor 31 August, 2012 - 12:54 Visualize energy APIs with a new OpenEI browser APIs Big Data cleanweb data OpenEI OpenEI has created a simple way to see energy APIs available...

  17. cleanweb | OpenEI Community

    Open Energy Info (EERE)

    Contributor 31 August, 2012 - 12:54 Visualize energy APIs with a new OpenEI browser APIs Big Data cleanweb data OpenEI OpenEI has created a simple way to see energy APIs available...

  18. gateway | OpenEI Community

    Open Energy Info (EERE)

    by Graham7781(2017) Super contributor 28 March, 2013 - 15:16 OpenEI launches new Water Power Gateway and Community Forum community forum gateway OpenEI Water power OpenEI...

  19. forum | OpenEI Community

    Open Energy Info (EERE)

    by Graham7781(2017) Super contributor 28 March, 2013 - 15:16 OpenEI launches new Water Power Gateway and Community Forum community forum gateway OpenEI Water power OpenEI...

  20. mediawiki | OpenEI Community

    Open Energy Info (EERE)

    8 November, 2012 - 13:58 OpenEI dashboard Google Analytics mediawiki OpenEI statistics wiki OpenEI web traffic from Bangalore, India Did you know that in the last month,...

  1. statistics | OpenEI Community

    Open Energy Info (EERE)

    statistics Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 November, 2012 - 12:58 OpenEI dashboard Google Analytics mediawiki OpenEI statistics wiki OpenEI web...

  2. EIS-0251: Department of the Navy Final Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel (November 1996)

    Broader source: Energy.gov [DOE]

    This Final Environmental Impact Statement addresses six general alternative systems for the loading, storage, transport, and possible disposal of naval spent nuclear fuel following examination.

  3. EIS-0222-SA-01: Supplement Analysis | Department of Energy

    Energy Savers [EERE]

    -SA-01: Supplement Analysis EIS-0222-SA-01: Supplement Analysis Hanford Comprehensive Land-Use Plan Environmental Impact Statement In September 1999 the U.S. Department of Energy (DOE) issued the Final Hanford Comprehensive Land-Use Plan (HCP) Environmental Impact Statement (EIS) (DOE/EIS-0222-F). The HCP EIS analyzed the impacts of alternatives for implementing a land-use plan for the DOE's Hanford Site for at least the next 50-year planning period and lasting for as long as DOE retains legal

  4. urdb | OpenEI Community

    Open Energy Info (EERE)

    urdb Home Utility Rate Description: Group interested in making improvements to OpenEI's utility rate data, structure and user interface. Links: OpenEI utilities gateway urdb...

  5. EIS-0283-S2: EPA Notice of Availability of the Draft Supplemental

    Broader source: Energy.gov (indexed) [DOE]

    Environmental Impact Statement | Department of Energy For more information on this project, see the project webpage: http://energy.gov/node/299815. Download Document PDF icon EIS-0283-S2: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement More Documents & Publications EIS-0403: EPA Notice of Availability of the Final Programmatic Environmental Impact Statement EIS-0478: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0490:

  6. EIS-0375: EPA Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 375: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0375: EPA Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste Download Document PDF icon EIS-0375: EPA Notice of Availability of the Draft Environmental Impact Statement More Documents & Publications EIS-0444: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0487: Notices of

  7. EIS-0407: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas PDF icon E9-22920.pdf More Documents & Publications EIS-0407: Record of Decision EIS-0407: Final Environmental Impact Statement EIS-0407: Notice of Intent to Prepare an Environmental Impact Statement

  8. EIS-0448: First Solar Desert Sunlight Project in Riverside County, CA |

    Office of Environmental Management (EM)

    Department of Energy 8: First Solar Desert Sunlight Project in Riverside County, CA EIS-0448: First Solar Desert Sunlight Project in Riverside County, CA June 24, 2011 EIS-0448: Final Environmental Impact Statement Desert Sunlight Solar Farm Project, California June 24, 2011 EIS-0448: Notice of Adoption of an Environmental Impact Statement First Solar Desert Sunlight Solar Farm Project October 6, 2011 EIS-0448: Record of Decision Issuance of a Loan Guarantee to First Solar, Inc., for the

  9. EIS-0454: Tonopah Solar Energy Crescent Dunes Solar Energy Project in Nye

    Office of Environmental Management (EM)

    County, NV | Department of Energy EIS-0454: Tonopah Solar Energy Crescent Dunes Solar Energy Project in Nye County, NV EIS-0454: Tonopah Solar Energy Crescent Dunes Solar Energy Project in Nye County, NV Documents Available for Download February 11, 2011 EIS-0454: Final Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy Project February 11, 2011 EIS-0454: Notice of Adoption of an Environmental Impact Statement Tonopah Solar Energy Crescent Dunes Solar Energy

  10. EIS-0455: Genesis Solar Energy Project in Riverside County, CA | Department

    Office of Environmental Management (EM)

    of Energy 5: Genesis Solar Energy Project in Riverside County, CA EIS-0455: Genesis Solar Energy Project in Riverside County, CA December 17, 2010 EIS-0455: Notice of Adoption of an Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA August 27, 2010 EIS-0455: Final Environmental Impact Statement Genesis Solar Energy Project, Riverside County, CA September 1, 2011 EIS-0455: Record of Decision Genesis Solar Energy Project, Riverside County, California

  11. EIS-0455: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (75 Federal Register FR 52736; August 27, 2010) (Final EIS), prepared by the BLM Palm Springs-South Coast Field Office with DOE as a cooperating agency. BLM consulted DOE...

  12. EIS-0170: Columbia River System Operation Review, BPA Area

    Broader source: Energy.gov [DOE]

    The Columbia River System Operation Review Final Environmental Impact Statement (EIS) evaluates the potential impacts of four alternatives that represent the likely range of allocations between the Federal and non-Federal projects.

  13. EIS-0393: Montanore Project; Montana | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Click the image to view the Final EIS. Contact Tish Eaton tkeaton@bpa.gov (503) 323-3469 More Information http:www.fs.fed.usnepafs-usda-pop.php?project11743...

  14. EIS-0380: Notice to Extend Comment Period on the Draft Site-Wide...

    Broader source: Energy.gov (indexed) [DOE]

    Notice of Intent to Prepare a Supplemental Environmental Impact Statement EIS-0238-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement to the Final...

  15. EIS-0472: Mitigation Action Plan | Department of Energy

    Energy Savers [EERE]

    Mitigation Action Plan EIS-0472: Mitigation Action Plan Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement DOE LM issued the Final Uranium Leasing Program Programmatic Environmental Impact Statement (DOE/EIS-0472) in March 2014 and issued the associated Record of Decision (ROD) on May 6, 2014; the ROD was published in the Federal Register on May 12, 2014. This Mitigation Action Plan addresses the mitigation commitments

  16. EIS-0472: Record of Decision | Department of Energy

    Energy Savers [EERE]

    Record of Decision EIS-0472: Record of Decision Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado The U.S. Department of Energy (DOE) announces its decision to continue management of the Uranium Lease Program (ULP) for 31 lease tracts for the next 10 years, consistent with DOE's preferred alternative identified in the Final Uranium Leasing Program Programmatic Environmental Impact Statement (Final ULP PEIS)(DOE/EIS-0472). DOE will implement this decision only after the

  17. EIS-0287-SA-01: Supplement Analysis | Department of Energy

    Office of Environmental Management (EM)

    -SA-01: Supplement Analysis EIS-0287-SA-01: Supplement Analysis Idaho High-Level Waste and Facilities Disposition DOE/EIS-0287-SA-01: Supplement Analysis for the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement (June 2005). In October 2002, DOE issued the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement that provided an analysis of the potential environmental consequences of alternatives/options for the management and

  18. EIS-0391: Record of Decision | Department of Energy

    Energy Savers [EERE]

    1: Record of Decision EIS-0391: Record of Decision Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington This is the first in a series of Records of Decision (RODs) that the U.S. Department of Energy intends to issue pursuant to the Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC&WM EIS, DOE/EIS-0391, December 2012). Decisions announced in this ROD pertain to each

  19. DOE/EIS-0236/SA-6 Final Supplement Analysis for Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management Programmatic Environmental Impact Statement

    Office of Environmental Management (EM)

    Government Department of Energy memorandum DATE: REPLY TO ATTN OF: DP-45 (G. Palmer, 6-1785) SUBJECT: DETERMINATION OF THE NEED FOR ADDITIONAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) REVIEW TO: Dave Beck, DP-20 As requested in your action memorandum, same subject, I have reviewed the attached Final Supplement Analysis for Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management Programmatic Environmental Impact Statement, dated August 1999. This

  20. EIS-0458: First Solar Topaz Solar Farm Project in San Luis Obispo County,

    Office of Environmental Management (EM)

    CA | Department of Energy 8: First Solar Topaz Solar Farm Project in San Luis Obispo County, CA EIS-0458: First Solar Topaz Solar Farm Project in San Luis Obispo County, CA Documents Available for Download August 12, 2011 EIS-0458: Final Environmental Impact Statement Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA August 12, 2011 EIS-0458: DOE Notice of Availability of the Final Environmental Impact Statement Proposed Loan

  1. Hawaii Clean Energy Final PEIS

    Office of Environmental Management (EM)

    A 1 2 Public Notices 3 Notices about the Draft Programmatic EIS Appendix A Hawai i Clean Energy Final PEIS A-1 September 2015 DOE/EIS-0459 The following Notice of Availability appeared in the Federal Register on April 18, 2014. Appendix A Hawai i Clean Energy Final PEIS A-2 September 2015 DOE/EIS-0459 Appendix A Hawai i Clean Energy Final PEIS A-3 September 2015 DOE/EIS-0459 DOE-Hawaii placed the following advertisement in The Garden Island on May 5 and 9, 2014. Appendix A Hawai i Clean Energy

  2. EA-1846: Final Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    6: Final Environmental Assessment EA-1846: Final Environmental Assessment Demonstration of Carbon Dioxide Capture and Sequestration of Steam Methane Reforming Process Gas Used for Large-Scale Hydrogen Production, Jefferson and Brazoria Counties, Texas PDF icon EA-1846-FEA-2011.pdf More Documents & Publications EIS-0464: Draft Environmental Impact Statement EIS-0464: Final Environmental Impact Statement EIS-0464: Record of Decision

  3. OpenEI API. Implementation help | OpenEI Community

    Open Energy Info (EERE)

    OpenEI API. Implementation help Home > Groups > Developer Hi Everyone, I am trying to determine the best way to consume the OpenEI utility rates and have come across the REST API....

  4. OpenEI search improvements | OpenEI Community

    Open Energy Info (EERE)

    tool or map file should be easier. OpenEI has many resources, too much for any one person to know and keep tabs on everything; so, I encourage you to use OpenEI search to find...

  5. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    New Result Formats on OpenEI Jweers 25 Mar 2013 - 12:22 Blog entry developer OpenEI maintenance March 8-9, 2013 Rmckeel 8 Mar 2013 - 14:23 Blog entry developer Current and...

  6. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: csp land use Type Term Title Author Replies Last Post...

  7. OpenEI Community Central | OpenEI Community

    Open Energy Info (EERE)

    Home > OpenEI Community Central > Posts by term > OpenEI Community Central Content Group Activity By term Q & A Feeds Term: acres Type Term Title Author Replies Last Post sort...

  8. OpenEI dashboard | OpenEI Community

    Open Energy Info (EERE)

    OpenEI dashboard Home > Blogs > Rmckeel's blog Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 November, 2012 - 12:58 Google Analytics mediawiki OpenEI statistics wiki...

  9. EIS-0327: Disposition of Scrap Metals Programmatic EIS

    Broader source: Energy.gov [DOE]

    DOE announced its intent to prepare an EIS that would evaluate the environmental impacts of policy alternatives for the disposition of scrap metals (primarily carbon steel and stainless steel) that may have residual surface radioactivity. DOE cancelled this EIS.

  10. EIS-0487: Notice of EIS Adoption | Department of Energy

    Energy Savers [EERE]

    Notice of EIS Adoption EIS-0487: Notice of EIS Adoption Freeport LNG Liquefaction Project, Brazoria County, Texas The Environmental Protection Agency issued a notice of DOE adoption of an EIS that the Federal Energy Regulatory Commission prepared, with DOE as a cooperating agency, on a proposal to expand an existing liquefied natural gas (LNG) import terminal and associated facilities in Brazoria County, Texas, to enable the terminal to liquefy and export LNG. PDF icon

  11. EIS-0230: Resource Contingency Program, Hermiston Power Project

    Broader source: Energy.gov [DOE]

    "The Bonneville Power Administration (BPA) prepared this environmental impact statement (EIS) to analyze the environmental impacts of implementing a Resource Contingency Program near Hermiston, Oregon, one of three proposed locations to carry out this program, which allows BPA to acquire power to supply to its customers if and when needed. In September 1993, BPA published a Notice of Intent to prepare an EIS on projects at three sites and in October 1993 held public scoping meetings at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. BPA concluded that publication of the final EIS should be separated into two documents, and presented the final analysis of the impacts of the other two sites in another document. This EIS addresses three proposed alternatives: the proposed action, no action, and other actions. The proposed action is the acquisition of power from both units optioned at the Hermiston Power Project Plant site (only if there is a need for power at a future date), or wheeling of power by BPA if another party acquires the output. This EIS addresses the environmental effects of constructing and operating both units under option for power delivery to BPA."

  12. SEDS | OpenEI Community

    Open Energy Info (EERE)

    8 August, 2012 - 12:37 New Gapminder Visualizations Added EIA Energy data Gapminder OECD OpenEI SEDS Visualization Graph OpenEI now features some cool new Gapminder...

  13. Gapminder | OpenEI Community

    Open Energy Info (EERE)

    8 August, 2012 - 12:37 New Gapminder Visualizations Added EIA Energy data Gapminder OECD OpenEI SEDS Visualization Graph OpenEI now features some cool new Gapminder...

  14. author | OpenEI Community

    Open Energy Info (EERE)

    data, and helpful information for OpenEI wiki authors Enabling developers to use energy web services on OpenEI, REEGLE.info, Data.gov and across the web. We help developers find...

  15. resources | OpenEI Community

    Open Energy Info (EERE)

    picture Submitted by Graham7781(2017) Super contributor 19 September, 2012 - 14:32 OpenEI part of the Federal Digital Strategy data Federal Digital Strategy OpenEI resources...

  16. OpenEI Community - wiki

    Open Energy Info (EERE)

    helpful information for OpenEI wiki authors

    Enabling developers to use energy web services on OpenEI, REEGLE.info, Data.gov and across the web. We help developers...

  17. wiki | OpenEI Community

    Open Energy Info (EERE)

    data, and helpful information for OpenEI wiki authors Enabling developers to use energy web services on OpenEI, REEGLE.info, Data.gov and across the web. We help developers find...

  18. Maintenance | OpenEI Community

    Open Energy Info (EERE)

    Maintenance Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 OpenEI maintenance March 8-9, 2013 developer Maintenance OpenEI We would like to...

  19. OpenEI Community - Maintenance

    Open Energy Info (EERE)

    maintenance March 8-9, 2013 http:en.openei.orgcommunityblogopenei-maintenance-march-8-9-2013

    We would like to inform the OpenEI community that OpenEI will be...

  20. Developer | OpenEI Community

    Open Energy Info (EERE)

    New Result Formats on OpenEI Jweers 25 Mar 2013 - 12:22 Blog entry developer OpenEI maintenance March 8-9, 2013 Rmckeel 8 Mar 2013 - 14:23 Blog entry developer Semantic Mediawiki...

  1. FRED | OpenEI Community

    Open Energy Info (EERE)

    FRED Home > FRED > Posts by term > FRED Content Group Activity By term Q & A Feeds Term: OpenEI Type Term Title Author Replies Last Post sort icon Blog entry OpenEI Introducing...

  2. checklist | OpenEI Community

    Open Energy Info (EERE)

    checklist Home Jweers's picture Submitted by Jweers(88) Contributor 12 March, 2012 - 14:40 Mockups of the Geothermal Checklist on OpenEI checklist geothermal mockups OpenEI...

  3. mockups | OpenEI Community

    Open Energy Info (EERE)

    mockups Home Jweers's picture Submitted by Jweers(88) Contributor 12 March, 2012 - 14:40 Mockups of the Geothermal Checklist on OpenEI checklist geothermal mockups OpenEI...

  4. EIS-0279: Amended Record of Decision | Department of Energy

    Energy Savers [EERE]

    Amended Record of Decision EIS-0279: Amended Record of Decision Spent Nuclear Fuel Management at the Savannah River Site The U.S. Department of Energy (DOE) is amending its August 7, 2000, Record of Decision (ROD) pursuant to the Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement, Aiken, SC (DOE/EIS-0279, 2000; SRS SNF EIS). In the 2000 ROD, DOE decided to develop and demonstrate a "melt and dilute" technology. DOE now amends that decision and will

  5. geospatial | OpenEI Community

    Open Energy Info (EERE)

    geospatial Home Geospatial Description: Discuss and explore geospatial data available on OpenEI. geospatial GIS spatial analysis...

  6. EIS-0488: Record of Decision | Department of Energy

    Energy Savers [EERE]

    Record of Decision EIS-0488: Record of Decision Cameron Liquefaction Project, Cameron Parish, Louisiana DOE issued a Record of Decision and Floodplain Statement of Findings for the Cameron liquefied natural gas export application to non-free trade agreement countries. PDF icon EIS-0488-ROD-FRversion-2014.pdf More Documents & Publications CAMERON LNG, LLC - FE DKT. NO. 15-36-LNG (FTA) Cameron LNG LLC - 14-001-CIC Cameron LNG LLC Final Order

  7. EIS-0337-SA-01: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -SA-01: Supplement Analysis EIS-0337-SA-01: Supplement Analysis West Valley Demonstration Project Waste Management The Department of Energy's (DOE) West Valley Demonstration Project (WVDP) prepared a final waste management environmental impact statement (WVDP WM ElS) that examined the potential environmental impacts associated with the proposed shipment of radioactive wastes that were either in storage or would be generated over a 10-year period (DOE 2003). Since the EIS was issued, new

  8. EIS-0161: Consolidated Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    Consolidated Record of Decision EIS-0161: Consolidated Record of Decision Tritium Supply and Recycling The U.S. Department of Energy (DOE) completed the Tritium Supply and Recycling Final Programmatic Environmental Impact Statement (PEIS) (DOE/EIS-0161) in October 1995. The Tritium Supply and Recycling PEIS assessed the potential environmental impacts of technology and siting alternatives for the production of tritium for national security purposes as well as the impacts of constructing a new

  9. EIS-0219: Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    Canyon Facility at the Savannah River Site, Aiken, SC The U.S. Department of Energy (DOE) has prepared and issued a Final Environmental Impact Statement (EIS) (DOE/EIS-0219, December 30, 1994), to assess the potential environmental impacts of stabilizing approximately 80,000 gallons of plutonium solutions currently stored in tanks in the F-Canyon chemical separations facility at the Savannah River Site (SRS) near Aiken, South Carolina. As long as the plutonium remains in solution there is a

  10. EIS-0283-S2: Surplus Plutonium Disposition Supplemental Environmental

    Office of Environmental Management (EM)

    Impact Statement | Department of Energy 83-S2: Surplus Plutonium Disposition Supplemental Environmental Impact Statement EIS-0283-S2: Surplus Plutonium Disposition Supplemental Environmental Impact Statement Summary This Supplemental EIS (SEIS) analyzes the potential environmental impacts associated with changes to the surplus plutonium disposition program, including changes to the inventory of surplus plutonium and proposed new alternatives. The Final SEIS does not identify a preferred

  11. EIS-0290: Idaho National Engineering and Environmental Laboratory Advanced

    Office of Environmental Management (EM)

    Mixed Waste Treatment Project (AMWTP) | Department of Energy 90: Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project (AMWTP) EIS-0290: Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project (AMWTP) SUMMARY The AMWTP Final EIS assesses the potential environmental impacts associated with alternatives related to the construction and operation of a proposed waste treatment facility at the Idaho National

  12. EIS-0380-SA-01: Supplement Analysis | Department of Energy

    Office of Environmental Management (EM)

    -SA-01: Supplement Analysis EIS-0380-SA-01: Supplement Analysis Continued Operation of Los Alamos National Laboratory: Proposed Transport of Low Level Radioactive Waste by Truck and Rail This analysis is prepared to determine if the Final Site-Wide Environmental Impact Statement (2008 SWEIS) for Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico, (DOE/EIS-0380) adequately bounds off-site transpofiation of Low Specific Activity (LSA) and Low Level Waste (LLW) by a

  13. EIS-0416: Ivanpah Solar Electric Generating System in San Bernardino

    Office of Environmental Management (EM)

    County, CA | Department of Energy 6: Ivanpah Solar Electric Generating System in San Bernardino County, CA EIS-0416: Ivanpah Solar Electric Generating System in San Bernardino County, CA Documents Available for Download October 22, 2010 EIS-0416: EPA Notice of Availability of the Final Environmental Impact Statement Ivanpah Solar Electric Generating System (07-AFC-5) Project, Proposal to Construct a 400-m Megawatt Concentrated Solar Power Tower, Thermal-Electric Power Plant, San Bernardino

  14. USFS | Open Energy Information

    Open Energy Info (EERE)

    in everything we do and are sensitive to the effects of our decisions on people and resources. We strive to meet the needs of our customers in fair, friendly, and open ways. We...

  15. Microsoft Word - Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOR IMMEDIATE RELEASE: Jill Moran, BLM (202) 452-5068 Wednesday, November 26, 2008 Bethany Shively, DOE (202) 586-4940 Joe Walsh, USFS (202) 205-1134 Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of

  16. Final Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement Richland, Washington

    Office of Environmental Management (EM)

    HSW EIS January 2004 1.6 Figure 1.2. States with Radioactive Waste Disposal Activities Final HSW EIS January 2004 1.12 Figure 1.3. Relationship of the HSW EIS to Other Hanford Cleanup Operations, Material Management Activities, and Key Environmental Reviews 2.17 Final HSW EIS January 2004 Figure 2.6. Waste Receiving and Processing Facility Figure 2.7. X-Ray Image of Transuranic Waste Drum Contents M0212-0286.11 HSW EIS 12-10-02 M0212-0286.12 HSW EIS 12-10-02 2.17 Final HSW EIS January 2004

  17. EIS-0360: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site

  18. EIS-0359: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site

  19. EIS-0250: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada

  20. EIS-0066: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    The Role of Bonneville Power Administration in the Pacific Northwest Power Supply System - Including Its Participation in a Hydro-Thermal Power Program

  1. EIS-0111: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Remedial Actions at the Former Vanadium Corporation of America Uranium Mill Site, Durango, La Plata County, Colorado

  2. EIS-0023: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Long-Term Management of Defense High-Level Radioactive Wastes (Research and Development Program for Immobilization) Savannah River Plant, Aiken, South Carolina

  3. EIS-0259: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Disposal of Decommissioned, Defueled Cruiser, Ohio Class, Los Angeles and Class Naval Reactor Plants

  4. EIS-0012: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Petroleum Production at Maximum Efficient Rate, Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California

  5. EIS-0020: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Crude Oil Transport Alternate From Naval Petroleum Reserve No. 1 Elk Hills/SOHIO Pipeline Connection Conveyance System, Terminal Tank Farm Relocation to Rialto, California

  6. EIS-0003: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Proton-Proton Storage Accelerator Facility (Isabelle), Brookhaven National Laboratory, Upton, New York

  7. EIS-0084: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Incineration Facility for Radioactively Contaminated Polychlorinated Biphenyls and Other Wastes, Oak Ridge Gaseous Diffusion Plant, Oak Ridge, Tennessee

  8. EIS-0029: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Strategic Petroleum Reserve, Texoma Group Salt Domes, Cameron and Calcasieu Parishes, Louisiana and Jefferson County, TX

  9. EIS-0458: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Proposed Loan Guarantee to Support Construction and Startup of the Topaz Solar Farm, San Luis Obispo County, CA

  10. DOE/ EIS-0050-FS Final Environmentl Impact

    Broader source: Energy.gov (indexed) [DOE]

    (STAR); and publication, NTIS-PR-360 available from (NTIS) at the above address. UNITED STATES DEPARTMENT OF ENERGY WASHINGTON, D.C. 2055 OFFICIAL BUSINESS PENAL TY FOR PRIVATE...

  11. EIS-0025: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota

  12. EIS-0049: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Geothermal Demonstration Program 50-MW Power Plant-Baca Ranch, Sandoval and Rio Arriba Counties, New Mexico

  13. EIS-0024: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Strategic Petroleum Reserve, Capline Group Salt Domes, Iberia, Napoleonville, Weeks Island Expansion, Bayou Choctaw Expansion, Chacahoula - Iberia, Iberville, and Lafourche Parishes, Louisiana

  14. EIS-0002: Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Allocation of Petroleum Feedstock, Baltimore Gas & Electric Co., Sollers Point SNG Plant, Sollers Point, Baltimore County, Maryland

  15. EIS-0062: Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Waste Management Operations Double-Shell Tanks for Defense High-Level Radioactive Waste Storage Savannah River Plant, Aiken, South Carolina

  16. EIS-0203: Programmatic Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs

  17. EIS-0028: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Lawrence Livermore National Laboratory and Sandia National Laboratories - Livermore Sites, Livermore, CA

  18. EIS-0075: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Petroleum Reserve Phase III Development, Texoma and Seaway Group Salt Domes (West Hackberry and Bryan Mound Expansion, Big Hill Development) Cameron Parish, Louisiana, and Brazoria and Jefferson Counties, Texas

  19. EIS-0350: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico

  20. EIS-0218: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel

  1. EIS-0293: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Conveyance and Transfer of Certain Land Tracts Administered by the U.S. Department of Energy and Located at Los Alamos National Laboratory, Los Alamos and Santa Fe Counties, New Mexico

  2. EIS-0092: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Conversion to Coal, Holyoke Water Power Company, Mt. Tom Generating Station Unit 1 Holyoke, Hampden County, Massachusetts

  3. EIS-0436: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington

  4. EIS-0157: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Lawrence Livermore National Laboratory, Continued Operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore

  5. EIS-0305: Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Treating Transuranic (TRU)/Alpha Low Level Waste at the Oak Ridge National Laboratory, Oak Ridge, Tennessee

  6. EIS-0086: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Conversion to Coal, New England Power Company, Salem Harbor Generating Station Units 1, 2, and 3, Salem, Essex County, Massachusetts

  7. EIS-0236-SA-06: Final Supplement Analysis

    Broader source: Energy.gov [DOE]

    Pit Manufacturing Facilities at Los Alamos National Laboratory, Stockpile Stewardship and Management

  8. EIS-0067: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company

  9. EIS-0081: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Long-Term Management of Liquid High-Level Radioactive Waste Stored at Western New York Nuclear Service Center, West Valley, New York

  10. EIS-0225-SA-02: Final Supplement Analysis

    Broader source: Energy.gov [DOE]

    Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapons Components Hazardous Waste Treatment and Processing Facility

  11. EIS-0132: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Remedial Actions at the Former Union Carbide Corp. Uranium Mill Sites, Rifle, Garfield County, Colorado

  12. EIS-0036: Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Coal Conversion Program, New England Power Company, Brayton Point Generating Station Plants 1, 2 and 3, Sommerset, Bristol County, Massachusetts

  13. Geothermal Exploration Techniques a Case Study. Final Report...

    Open Energy Info (EERE)

    Techniques a Case Study. Final Report Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Geothermal Exploration Techniques a Case Study. Final Report...

  14. EIS-0388: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 88: Notice of Intent to Prepare an Environmental Impact Statement EIS-0388: Notice of Intent to Prepare an Environmental Impact Statement Operation of a Biosafety Level 3 Facility at Los Alamos National Laboratory, Los Alamos, New Mexico Download Document PDF icon EIS-0388: Notice of Intent to Prepare an Environmental Impact Statement More Documents & Publications EIS-0238-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement to the Final

  15. EIS-0441: BLM Notice of Intent to Prepare an Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy 441: BLM Notice of Intent to Prepare an Environmental Impact Statement EIS-0441: BLM Notice of Intent to Prepare an Environmental Impact Statement Mohave County Wind Farm Download Document PDF icon EIS-0441: BLM Notice of Intent to Prepare an Environmental Impact Statement More Documents & Publications EIS-0441: BLM Notice of Intent to Prepare an Environmental Impact Statement EA-1587: Finding of No Significant Impact EA-1665: Final Environmental Assessment and

  16. EIS-0425: Record of Decision and Mitigation Action Plan | Department of

    Office of Environmental Management (EM)

    Energy 5: Record of Decision and Mitigation Action Plan EIS-0425: Record of Decision and Mitigation Action Plan Bonneville Power Administration Record of Decision and Mitigation Action Plan for the Mid-Columbia Restoration Project BPA decided to implement the Proposed Action of the Mid-Columbia Coho Restoration Program as described in the Mid-Columbia Coho Restoration Program Final Environmental Impact Statement (EIS) (DOE/EIS-0425, March 2012). BPA will fund the construction, operation, and

  17. EIS-0443: Southwest Intertie Project-South (SWIP-S), White Pine, Nye,

    Office of Environmental Management (EM)

    Lincoln, and Clark counties, NV | Department of Energy 3: Southwest Intertie Project-South (SWIP-S), White Pine, Nye, Lincoln, and Clark counties, NV EIS-0443: Southwest Intertie Project-South (SWIP-S), White Pine, Nye, Lincoln, and Clark counties, NV Documents Available for Download October 26, 2010 EIS-0443: Record of Decision Project Financing for Southwest Intertie Project - South February 19, 2010 EIS-0443: Final Environmental Impact Statement Project Financing for Southwest Intertie

  18. EIS-0476: Vogtle Electric Generating Plant in Burke County, GA | Department

    Office of Environmental Management (EM)

    of Energy 6: Vogtle Electric Generating Plant in Burke County, GA EIS-0476: Vogtle Electric Generating Plant in Burke County, GA February 8, 2012 EIS-0476: Final Environmental Impact Statement Department of Energy Loan Guarantees for Proposed Units 3 and 4 at the Vogtle Electric Generating Plant, Burke County, GA February 25, 2014 EIS-0476: Record of Decision Department of Energy Loan Guarantees for Proposed Units 3 and 4 at the Vogtle Electric Generating Plant, Burke County, GA

  19. Bureau of Land Management - Final Programmatic Environmental...

    Open Energy Info (EERE)

    to: navigation, search OpenEI Reference LibraryAdd to library Report: Bureau of Land Management - Final Programmatic Environmental Impact Statement for Geothermal Leasing in the...

  20. OpenEIS Algorithms

    Energy Science and Technology Software Center (OSTI)

    2013-07-29

    The OpenEIS Algorithm package seeks to provide a low-risk path for building owners, service providers and managers to explore analytical methods for improving building control and operational efficiency. Users of this software can analyze building data, and learn how commercial implementations would provide long-term value. The code also serves as a reference implementation for developers who wish to adapt the algorithms for use in commercial tools or service offerings.

  1. EIS-0408: Upper Great Plains Wind Energy Programmatic EIS | Department...

    Broader source: Energy.gov (indexed) [DOE]

    U.S. Fish and Wildlife Service, as joint lead agencies, prepared a programmatic EIS that evaluates issues and potential environmental impacts associated with wind energy...

  2. OpenEI Contacts | OpenEI Community

    Open Energy Info (EERE)

    to improve efficiency and user experience. Contacts on OpenEI are designed to provide contact information for industry professionals or organization positions. Contact information...

  3. EIS-0327: Disposition of Scrap Metals Programmatic EIS | Department...

    Broader source: Energy.gov (indexed) [DOE]

    intent to prepare an EIS that would evaluate the environmental impacts of policy alternatives for the disposition of scrap metals (primarily carbon steel and stainless steel)...

  4. structured | OpenEI Community

    Open Energy Info (EERE)

    REEEP REEGLE structured tagging API Reegle and OpenEI share the vision that easy access to energy information will help drive future developments in clean energy development....

  5. legislation | OpenEI Community

    Open Energy Info (EERE)

    OpenEI President Obama President Obama recently signed into law the American Energy Manufacturing Technical Corrections Act, a piece of legislation that includes provisions that...

  6. OpenEI Community - EIA

    Open Energy Info (EERE)

    nizes-utility-rate-database-openei

    EI and U.S. Energy Information Administration (EIA)" src"http:en.openei.orgcommunityfilesopeneieia.jpg"...

  7. launch | OpenEI Community

    Open Energy Info (EERE)

    Apps for Vehicles Challenge has begun contest data fuel efficiency launch Obama Administration OpenEI Vehicles Data Challenge **Update: Visit the Apps for Vehicles page for all...

  8. OpenEI Community - EERE

    Open Energy Info (EERE)

    more

    http:en.openei.orgcommunityblogdatapalooza-announcementscomments APIs Big Data Datapalooza EDI EERE Open Data OpenEI Energy Data Jam EERE - Energy Data...

  9. OpenEI Community - Datapalooza

    Open Energy Info (EERE)

    more

    http:en.openei.orgcommunityblogdatapalooza-announcementscomments APIs Big Data Datapalooza EDI EERE Open Data OpenEI Energy Data Jam EERE - Energy Data...

  10. webinar | OpenEI Community

    Open Energy Info (EERE)

    overview cleanweb hackathon resource webinar Today, Ian Kalin, a presidential innovation fellow, and the OpenEI team recorded an "energy resource" overview for developers of...

  11. resource | OpenEI Community

    Open Energy Info (EERE)

    overview cleanweb hackathon resource webinar Today, Ian Kalin, a presidential innovation fellow, and the OpenEI team recorded an "energy resource" overview for developers of...

  12. Sfomail's blog | OpenEI Community

    Open Energy Info (EERE)

    recognizes utility rate database on OpenEI EIA OpenEI Utility Rates OpenEI and U.S. Energy Information Administration (EIA) Good news, everyone The U.S. Energy...

  13. Community is Live!! | OpenEI Community

    Open Energy Info (EERE)

    > Groups > OpenEI Community Central Graham7781's picture Submitted by Graham7781(2017) Super contributor 25 June, 2012 - 16:10 imported OpenEI OpenEI Community section is now...

  14. Rmckeel's blog | OpenEI Community

    Open Energy Info (EERE)

    Contributor 31 August, 2012 - 12:54 Visualize energy APIs with a new OpenEI browser APIs Big Data cleanweb data OpenEI OpenEI has created a simple way to see energy APIs available...

  15. Water Power Forum | OpenEI Community

    Open Energy Info (EERE)

    OpenEI Type Term Title Author Replies Last Post sort icon Blog entry OpenEI OpenEI launches new Water Power Gateway and Community Forum Graham7781 28 Mar 2013 - 15:16...

  16. Google Analytics | OpenEI Community

    Open Energy Info (EERE)

    8 November, 2012 - 12:58 OpenEI dashboard Google Analytics mediawiki OpenEI statistics wiki OpenEI web traffic from Bangalore, India Did you know that in the last month,...

  17. EIS-0287: Amended Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    Disposition Final Environmental Impact Statement Revised by State The U.S. Department of Energy is amending its initial ROD published December 19, 2005, pursuant to the Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement, issued in October 2002. PDF icon Amended Record of Decision: Idaho High-Level Waste and Facilities Disposition Final Environmental Impact Statement Revised by State, DOE/EIS-0287 (January 2010) 75 FR 137 More Documents & Publications

  18. Draft GTCC EIS Summary

    Office of Environmental Management (EM)

    Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOE/EIS-0375-D) February 2011 SUMMARY ENERGY U.S. DEPARTMENT OF U.S. D E P A R T M E N T O F E N E R G Y On the cover: The photographs on the front cover are, from left to right: glove boxes contaminated with GTCC Other Waste, abandoned Am-241 and Cs-137 gauges and shipping shields, and disused well logging sources being loaded into a 55-gallon drum. COVER SHEET Lead Agency: U.S.

  19. EIS-0034: Strategic Petroleum Reserve, Expansion of Reserve, Supplemental

    Broader source: Energy.gov [DOE]

    The Strategic Petroleum Reserve (SPR) developed this SEIS to address the environmental impacts of expanding the SPR to store 1,000 million barrels of oil. The final programmatic EIS (FEA-FES-76-2), addressed the environmental impacts of storing 500 million barrels of oil.

  20. EIS-0288: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Environmental Impact Statement (EIS) for the Production of Tritium in a Commercial Light Water Reactor