Powered by Deep Web Technologies
Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

FFCAct Clearinghouse, Directory of abstracts. Revision 1  

SciTech Connect (OSTI)

The Federal Facility Compliance Act (FFCAct) Clearinghouse is a card catalog of information about the FFCAct and its requirements for developing Site Treatment Plans (STP). The information available in the clearinghouse includes abstracts describing computer applications, technical reports, and a list of technical experts. Information can be accessed for use in responding to FFCAct requirements, and the clearinghouse provides search capabilities on particular topics and issues related to STP development. Appendix A includes: contacts from each site, for which contact has been made, who are developing STPs; the FFCAct Clearinghouse Fact Sheet and; additional hard copy forms to be used to populate the database. This report contains 50 abstracts related to the Radioactive Waste Technical Support Program.

Harwood, T.

1994-05-01T23:59:59.000Z

2

Nevada Test Site FFCA Consent Order, March 27, 1996 Summary  

Broader source: Energy.gov (indexed) [DOE]

Test Site Federal Facility Compliance Act Test Site Federal Facility Compliance Act Consent Order, March 27, 1996 State Nevada Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Enforce the STP and establish procedures for reviewing schedules, deleting waste streams, and administrative procedures Parties DOE; Nevada Division of Environmental Protection Date 3/27/1996 SCOPE * Require DOE to achieve compliance with the requirements of the FFCAct through the STP which contains schedules and applicable strategies for achieving compliance with the applicable LDR standards. * Establish procedures for reviewing schedules, deleting waste streams, and administrative procedures. * Establish enforceable schedules and milestones applicable to this Order. ESTABLISHING MILESTONES *

3

SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT  

SciTech Connect (OSTI)

This scoping summary supports development of the combined Remedial Investigation (RI)/Baseline Risk Assessment (BRA)/Feasibility Study (FS) for the P-Area Operable Unit (PAOU), or Combined document, which will be submitted on or before 09/28/2007. The objective of this Feasibility Study scoping summary meeting is to agree on the likely response actions to be evaluated and developed as alternatives in the combined document and agree on the uncertainties identified and whether they have been adequately managed.

Kupar, J; Sadika Baladi, S; Mark Amidon, M

2007-05-22T23:59:59.000Z

4

Tank farm restoration and safe operation, Project W-314, upgrade scope summary report (USSR)  

SciTech Connect (OSTI)

The revision to the Project W-314 Upgrade Scope Summary Report (USSR), incorporates changes to the project scope from customer guidance. Included are incorporation of the recommendations from HNF-2500, agreements regarding interfaces with Project W-211, and assumption of scope previously assigned to Project W-454.

Gilbert, J.L.

1998-07-23T23:59:59.000Z

5

FFCAct Clearinghouse, directory of abstracts: Radioactive waste technical support program. Revision 2  

SciTech Connect (OSTI)

The Federal Facility Compliance Act (FFCAct) Clearinghouse is a card catalog of information about the FFCAct and its requirements for developing Site Treatment Plans (STP). The information available in the clearinghouse includes abstracts describing computer applications, technical reports, and a list of technical experts. This report contains 61 abstracts from the database relating to radioactive waste management. The clearinghouse includes information on characterization, retrieval, treatment, storage, and disposal elements of waste management as they relate to the FFCAct and the treatment of mixed wastes. Subject areas of information being compiled include: commercial treatment capabilities; listings of technical experts for assistance in selecting and evaluating treatment options and technologies; mixed waste data and treatability groups; guidance on STP development; life-cycle costs planning estimates for facilities; references to documentation on available technologies and technology development activities; Waste Acceptance Criteria (WAC) for treatment facilities; regulatory, health and safety issues associated with treatment facilities and technologies; and computer databases, applications, and models for identifying and evaluating treatment facilities and technologies. Access to the FFCAct clearinghouse is available to the DOE and its DOE contractors involved in STP development and other FFCAct activities.

NONE

1994-10-01T23:59:59.000Z

6

Paducah DUF6 Conversion Final EIS - Appendix C: Scoping Summary Report for Depleted Uranium Hexafluoride Conversion Facilities - Environmental Impact Statement Scoping Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Paducah DUF Paducah DUF 6 Conversion Final EIS APPENDIX C: SCOPING SUMMARY REPORT FOR DEPLETED URANIUM HEXAFLUORIDE CONVERSION FACILITIES ENVIRONMENTAL IMPACT STATEMENT SCOPING PROCESS Scoping Summary Report C-2 Paducah DUF 6 Conversion Final EIS Scoping Summary Report C-3 Paducah DUF 6 Conversion Final EIS APPENDIX C This appendix contains the summary report prepared after the initial public scoping period for the depleted uranium hexafluoride conversion facilities environmental impact statement (EIS) project. The scoping period for the EIS began with the September 18, 2001, publication of a Notice of Intent (NOI) in the Federal Register (66 FR 23213) and was extended to January 11, 2002. The report summarizes the different types of public involvement opportunities provided and the content of the comments received.

7

Nevada Test Site FFCA Consent Order, May 10, 1996 Summary  

Broader source: Energy.gov (indexed) [DOE]

Federal Facility Agreement and Consent Order Federal Facility Agreement and Consent Order (FFACO) State Nevada Agreement Type Federal Facility Agreement and Consent Order Legal Driver(s) FFCAct Scope Summary Identify sites of potential historic contamination and implement proposed corrective actions Parties DOE; Department of Defense (DoD); Nevada Division of Environmental Protection (NDEP) Date 5/10/1996 SCOPE * Identify sites of potential historic contamination and implement proposed corrective actions. * Establish specific sampling and monitoring requirements, including drilling and subsurface sampling. ESTABLISHING MILESTONES * Within sixty (60) calendar days following the signing of this Agreement, the parties shall meet to review Appendices II-IV and concur on the classification of all presently

8

General Atomics Compliance Order, October 6, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

General Atomics General Atomics Agreement Name General Atomics Compliance Order, October 6, 1995 HWCA 95/96-017 State California Agreement Type Compliance Agreement Legal Driver(s) FFCAct Scope Summary Address LDR requirements pertaining to storage and treatment of covered waste at General Atomics Parties DOE; State of California Environmental Protection Agency (Department of Toxic Substances Control) Date 10/6/1995 SCOPE * Address LDR requirements pertaining to storage and treatment of covered waste at General Atomics. * Require adherence to the Site Treatment Plan which provides overall schedules for achieving compliance with LDR storage and treatment requirements based on milestones. ESTABLISHING MILESTONES * Respondent shall carry out all activities in accordance with the schedules and

9

Oak Ridge Reservation Compliance Order, September 26, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge Reservation Compliance Order, September Oak Ridge Reservation Compliance Order, September 26, 1995 State Tennessee Agreement Type Compliance Order Legal Driver(s) FFCAct Scope Summary Enforce the Plan and ensure that the Respondent completes all work in accordance with the schedules contained in, and/or developed pursuant to, the Plan Parties DOE; Tennessee Department of Environment and Conservation Date 9/26/1995 SCOPE * Approve, with modifications made by TDEC, the "Proposed Site Treatment Plan for the Oak Ridge Reservation," hereafter known as the Plan. * Enforce the Plan and ensure that the Respondent completes all work in accordance with the schedules contained in, and/or developed pursuant to, the Plan. ESTABLISHING MILESTONES * Schedules are contained in the Plan.

10

Lawrence Berkeley National Laboratory Compliance Order, October 6, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

Berkeley National Laboratory Berkeley National Laboratory Agreement Name Lawrence Berkeley National Laboratory Compliance Order, October 6, 1995 HWCA # 95/96-016 State California Agreement Type Compliance Agreement Legal Driver(s) FFCAct Scope Summary Address LDR requirements pertaining to storage and treatment of covered waste at LBNL Parties DOE; State of California Environmental Protection Agency (Department of Toxic Substances Control) Date 10/6/1995 SCOPE * Address LDR requirements pertaining to storage and treatment of covered waste at LBNL. * Require adherence to the Site Treatment Plan which provides overall schedules for achieving compliance with LDR storage and treatment requirements based on milestones. ESTABLISHING MILESTONES * Respondent shall carry out all activities in accordance with the schedules and

11

Idaho National Engineering Laboratory Consent Order, November 1, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

Consent Order, Consent Order, November 1, 1995 State Idaho Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Resolve LDR storage violations. Approve the modified "INEL Site Treatment Plan" Parties DOE; Idaho Department of Health and Welfare Date 11/1/1995 SCOPE * Approve the modified "INEL Site Treatment Plan." * Resolve LDR storage violations and pursuant to Section 3021(b) of RCRA through DOE agreement to the terms and conditions of the approved INEL Site Treatment Plan. ESTABLISHING MILESTONES * No specific provisions are set forth in this Order. FUNDING * No specific provisions are set forth in this Order. PENALTIES * DOE expressly recognizes that failure to comply with the terms of this Consent Order may result in an enforcement action for any relief available under the HWMA.

12

Los Alamos National Laboratory Compliance Order, October 4, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

Federal Facility Compliance Order Federal Facility Compliance Order State New Mexico Agreement Type Compliance Agreement Legal Driver(s) New Mexico Hazardous Waste Act (NMHWA)/ FFCAct /RCRA Scope Summary Require compliance with a Site Treatment Plan for the treatment of mixed waste at Los Alamos National Lab. Parties DOE; University of California; New Mexico Environment Department Date 10/04/1995 SCOPE * Require compliance with a Site Treatment Plan for the treatment of mixed waste at Los Alamos National Lab. * Bring the Los Alamos National Lab into compliance with the requirements for the storage and treatment of mixed waste under RCRA and the NMHWA. * Establish that DOE and the University of California have both joint and several liability for meeting the conditions of the agreement.

13

Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)  

SciTech Connect (OSTI)

This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

None

1992-09-18T23:59:59.000Z

14

Portsmouth Gaseous Diffusion Plant Director's Final Findings and Orders, October 4, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

Portsmouth Gaseous Diffusion Plant Director's Final Portsmouth Gaseous Diffusion Plant Director's Final Findings and Orders, October 4, 1995 State Ohio Agreement Type Federal Facility Agreement Legal Driver(s) FFCAct Scope Summary Agreement between the Ohio EPA and DOE approving the STP and setting waste treatment milestones Parties DOE; Ohio Department of Environmental Protection Date 10/4/1995 SCOPE * Approve the Compliance Plan Volume of the amended PSTP submitted to Ohio EPA on October 2, 1995, hereafter referred to as "approved STP." * Set forth guidelines for storage and treatment of mixed wastes at the Facility which are not being stored in accordance with the LDR requirements of OAC rule 3745-59- 50. * Establish milestones and target dates for approved STP. ESTABLISHING MILESTONES

15

West Valley Demonstration Project Administrative Consent Order, August 27, 1996 Summary  

Broader source: Energy.gov (indexed) [DOE]

West Valley Demonstration Project (WVDP) West Valley Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1996 State New York Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Establish commitments regarding compliance with the approved Site Treatment Plan (STP) regarding mixed waste stored and generated at the WVDP Parties DOE; New York State Department of Environmental Conservation (NYSDEC) Date 8/27/1996 SCOPE * Establish commitments regarding compliance with the approved Site Treatment Plan (STP) regarding mixed waste stored and generated at the WVDP. * Establish an enforceable framework in which DOE will develop and apply treatment or otherwise meet Land Disposal Restriction (LDR) requirements. * Provide for storage of current and projected LDR mixed wastes at the WVDP pending

16

Energy Technology and Engineering Center Compliance Order, October 6, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

Energy Technology and Engineering Center Energy Technology and Engineering Center Agreement Name Energy Technology and Engineering Center Compliance Order, October 6, 1995 HWCA # 95/96-019 State California Agreement Type Compliance Agreement Legal Driver(s) FFCAct Scope Summary Address LDR requirements pertaining to storage and treatment of covered waste at ETEC Parties DOE; State of California Environmental Protection Agency (Department of Toxic Substances Control) Date 10/6/1995 SCOPE * Address LDR requirements pertaining to storage and treatment of covered waste at ETEC. * Require adherence to the Site Treatment Plan which provides overall schedules for achieving compliance with LDR storage and treatment requirements based on milestones. ESTABLISHING MILESTONES * Respondent shall carry out all activities in accordance with the schedules and

17

Mound Plant Director's Final Findings and Orders, October 4, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

Director's Final Findings and Orders Director's Final Findings and Orders State Ohio Agreement Type Compliance Agreement Legal Driver(s) FFCAct Scope Summary Approve the Compliance Plan Volume of the amended PSTP, hereafter referred to as the "approved STP" Parties DOE; Ohio Environmental Protection Agency Date 10/4/1995 SCOPE * Approve the Compliance Plan Volume of the amended PSTP, hereafter referred to as the "approved STP." * The approved STP and these Orders address storage and treatment of all mixed wastes at the Facility, which are not being stored in accordance with the LDR requirements of OAC rule 3745-59-50. ESTABLISHING MILESTONES * Milestones shall be established for a three year rolling period consisting of the current federal fiscal year plus two additional federal fiscal years.

18

Battelle Columbus Laboratories Director's Final Findings and Orders, October 4, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

Battelle Columbus Laboratories Battelle Columbus Laboratories Agreement Name Battelle Columbus Laboratories Director's Final Findings and Orders, October 4, 1995 State Ohio Agreement Type Federal Facility Agreement Legal Driver(s) FFCAct Scope Summary Approve the Compliance Plan Volume of the amended PSTP, hereafter referred to as the "approved STP," and address the generation and treatment of mixed wastes at the Facilities Parties DOE; Ohio Environmental Protection Agency Date 10/4/1995 SCOPE * Approve the Compliance Plan Volume of the amended PSTP, hereafter referred to as the "approved STP." * Address the generation and treatment of all mixed wastes at the Facilities, which are not being accumulated in accordance with the timeframes established in OAC

19

Rocky Flats Environmental Technology Site Treatment Plan Compliance Order, October 3, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

Order Requiring Compliance with Site Treatment Plan Order Requiring Compliance with Site Treatment Plan No. 95-10-03-01 State Colorado Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Approve with modifications the Proposed Site Treatment Plan for RFETS (MLLW); establish a Mixed Transuranic waste Agreement Parties DOE; Colorado Department of Public Health and Environment (CDPHE) Date 10/3/1995 SCOPE * In regard to Mixed Low-Level waste, approve with modifications the Proposed Site Treatment Plan for RFETS and require compliance by DOE with the modified and approved Site Treatment Plan. * In regard to Mixed Transuranic waste, establish and ensure compliance with an Agreement addressing compliance with the Hazardous and Solid Waste Amendments of 1984 to RCRA. ESTABLISHING MILESTONES

20

Savannah River Site Consent Order 95-22-HW, September 29, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site Consent Order, September 29, 1995 Savannah River Site Consent Order, September 29, 1995 (No. 95-22-HW) State South Carolina Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Approve and establish guidelines for the Proposed Site Treatment Plan Parties DOE (SRS); State of South Carolina (Department of Health and Environmental Control) Date 9/29/1995 SCOPE * Approve the Proposed Site Treatment Plan, now to be known as the Approved Site Treatment Plan. * Establish guidelines for executing the Approved STP. ESTABLISHING MILESTONES * No later than April 30 of each year, SRS shall submit to the Department Annual Updates to the Approved STP. * SRS shall submit to the Department for information only a progress report on the Waste Isolation Pilot Plan (WIPP) with the Annual Update.

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Lawrence Livermore National Laboratory Federal Facility Compliance Order, February 24, 1997 Summary  

Broader source: Energy.gov (indexed) [DOE]

Federal Facility Compliance Act Order for Lawrence Federal Facility Compliance Act Order for Lawrence Livermore National Laboratory Compliance Order HWCA 96/97-5002 State California Agreement Type Federal Facility Agreement Legal Driver(s) FFCAct Scope Summary Require compliance by the DOE with a Site Treatment Plan for the treatment of mixed waste at Lawrence Livermore National Laboratory Parties DOE; State of California Environmental Protection Agency (Department of Toxic Substances Control) Date 2/24/1997 SCOPE * Require compliance by the DOE with a Site Treatment Plan for the treatment of mixed waste at Lawrence Livermore National Laboratory. * Address LDR requirements pertaining to storage and treatment of covered waste at LLNL. ESTABLISHING MILESTONES * The Compliance Plan Volume of the STP provides overall schedules for achieving

22

Laboratory for Energy-Related Health Research Compliance Order, October 6, 1995 Summary  

Broader source: Energy.gov (indexed) [DOE]

Energy-Related Health Research Energy-Related Health Research Agreement Name Federal Facility Compliance Act Order for the Laboratory for Energy-Related Health Research (LEHR) Compliance Order HWCA # 95/96-020 State California Agreement Type Compliance Order Legal Driver(s) FFCAct Scope Summary Require compliance by the DOE with a Site Treatment Plan for the treatment of mixed waste at the Laboratory for Energy-Related Health Research Parties DOE; State of California Environmental Protection Agency (Department of Toxic Substances Control) Date 10/6/1995 SCOPE * Require compliance by the DOE with a Site Treatment Plan for the treatment of mixed waste at the Laboratory for Energy-Related Health Research. ESTABLISHING MILESTONES * The Compliance Plan Volume of the STP provides overall schedules for achieving

23

SUPPLEMENTAL PACKAGE FOR THE SCOPING SUMMARY FOR THE P-AREA OPERABLE UNIT  

SciTech Connect (OSTI)

Arsenic and selenium were tentatively identified as ecological RCOCs for the PAOU Ash Basin (PAOU Post-Characterization/Problem Identification Scoping Meeting, March 2007). Core Team agreed to consider eliminating these constituents as RCOCs based on a revised uncertainty discussion. The ecological risk tables and revised text (in its entirety) for the PAOU Ash Basin are provided in the Supplemental Information Package for the FS Scoping Meeting (June 2007). Arsenic and selenium have been traditionally carried through as ecological RCOCs (D-Area Ash Basin, A-Area Ash Pile).

Kupar, J; Sadika Baladi, S; Mark Amidon, M

2007-05-23T23:59:59.000Z

24

Scoping Meeting Summary , Pahoa, Hawai'i, March 1992, 2 PM Session  

SciTech Connect (OSTI)

The meeting began with presentations by the facilitator, Mr. Spiegel, and the representative from DOE, Dr. Lewis. The facilitator introduced those on the podium. He then described the general structure of the meeting and its purpose: to hear the issues and concerns of those present regarding the proposed Hawaiian Geothermal Project. He described his role as assuring the impartiality and fairness of the meeting. Dr. Lewis of DOE further defined the scope of the project, introduced those of the EIS team present and briefly described the EIS process.

Quinby-Hunt, Mary S.

1992-06-08T23:59:59.000Z

25

CERCA LEU fuel assemblies testing in Maria Reactor - safety analysis summary and testing program scope.  

SciTech Connect (OSTI)

The presented paper contains neutronic and thermal-hydraulic (for steady and unsteady states) calculation results prepared to support annex to Safety Analysis Report for MARIA reactor in order to obtain approval for program of testing low-enriched uranium (LEU) lead test fuel assemblies (LTFA) manufactured by CERCA. This includes presentation of the limits and operational constraints to be in effect during the fuel testing investigations. Also, the scope of testing program (which began in August 2009), including additional measurements and monitoring procedures, is described.

Pytel, K.; Mieleszczenko, W.; Lechniak, J.; Moldysz, A.; Andrzejewski, K.; Kulikowska, T.; Marcinkowska, A.; Garner, P. L.; Hanan, N. A.; Nuclear Engineering Division; Institute of Atomic Energy (Poland)

2010-03-01T23:59:59.000Z

26

Puget Sound Area Electric Reliability Plan : Scoping Summary Report - Part B Preliminary Technical Analysis Appendix A.  

SciTech Connect (OSTI)

This report describes in general terms the nature of the voltage instability problem facing the Puget Sound area. The following two chapters cover the technical aspects of the problem. It deals with load growth, the root cause of the problem. Also addressed is the capacity of the current power system and the criteria for future system planning. It also explains the technical results of transmission system modeling which confirm the system's vulnerability to voltage instability, the principal symptom of the problem. The results of the scoping process in each of the four measure categories are presented. Included are lists of all options identified, a discussion of the screening criteria, and descriptions of the measures that survived the screening process and are proposed for further evaluation in Phase 2. We discuss the evaluation methodology which will be used to refine the analyses. The next steps in the planning process are outlined. It also describes the short term operational agreements that will assure continued reliable service until a long term solution is in place. 8 figs., 22 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

27

SCOPE CHINA SCOPE CHINA  

E-Print Network [OSTI]

SCOPE CHINA SCOPE CHINA 92030006 86-351-7010700 86-351-7010700 E-mail: scope #12;SCOPE-ZHONGYU ENvirONmENtal FOrUm 2012 October 11-14, 2012 Taiyuan, Shanxi Province, China Chair of Environmental Development Dr. Shu Sun, Academician, President of SCOPE CAST China Former Vice President

Wang, Wei Hua

28

Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Summary Project Summary HELP Index Summary Scenario References Student Pages Subject/Content Area: Ecology and Data Collection Target Audience: This project is designed for upper intermediate grade students. Access to a river or stream is critical to the success of this project. Students need access to the Internet and data collection software. Project Goals: When presented with an environmental problem on a local river, students will use their knowledge of river ecology to develop an action plan. Learner Outcomes: The students will be able to Use river monitoring equipment to collect river monitoring data, including biological, physical,and chemical data. Design a project that aids the class in accompolishing one of four goals: Raising smallmouth bass Creating a stream habitat in an aquarium

29

Summary  

Broader source: Energy.gov (indexed) [DOE]

Golden Field Office Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Summary Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Summary COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating agency in the preparation of the Abengoa Biorefinery Project EIS.

30

Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SPACE SPACE Project Summary HELP Index Summary Scenario Internet Links Student Pages Subject/Content Area: Interdisciplinary: Science - astronomy; Math - problem-solving and measurement; Art; Social Studies - current events; and Language Arts - reference. skills Target Audience: Middle school students, 7th grade, all levels Project Goals: A collaborative, seven-to-ten weeks investigation of the space program, specifically space stations, its impact on our lives and the world Learner Outcomes: Students will be able to: Gather information and use decision-making skills to evaluate this information. Establish connections and to develop decision-making skills about science and technology. Identify and state a problem; design, implement, and evaluate the solution. Gather and use information for research purposes.

31

Summary  

Broader source: Energy.gov (indexed) [DOE]

Imperial-Mexicali DEIS Imperial-Mexicali DEIS S-1 May 2004 SUMMARY S.1 BACKGROUND S.1.1 Previous NEPA Review and Litigation Baja California Power, Inc. (hereafter referred to as Intergen), applied to the U.S. Department of Energy (DOE) on February 27, 2001, to construct a double-circuit, 230,000-volt (230-kV) transmission line across the U.S.-Mexico border. In a separate but similar proceeding, Sempra Energy Resources (hereafter referred to as Sempra) applied to DOE for a Presidential permit on March 7, 2001, also proposing to construct a double-circuit, 230-kV transmission line across the U.S.-Mexico border. Executive Order (E.O.) 10485 (September 9, 1953), as amended by E.O. 12038 (February 7, 1978), requires that a Presidential permit be issued by DOE before electric transmission facilities may be constructed, operated, maintained,

32

Scoping Comment Summary 092412.docx  

National Nuclear Security Administration (NNSA)

Plutonium Disposition Supplemental Environmental Impact Statement U.S. Department of Energy, National Nuclear Security Administration, and Tennessee Valley Authority Since...

33

Report on summary results of the inspection of issues regarding the scope of the accident investigation of the TRISTAN Fire at the Brookhaven National Laboratory  

SciTech Connect (OSTI)

The subject final report is provided to inform you of our findings and recommendations concerning our review of issues regarding the scope of the accident investigation of a March 31, 1994, fire at the Terrific Reactor Isotope Separator To Analyze Nuclides (TRISTAN) experiment at the Department of Energy (DOE) Brookhaven National Laboratory (BNL), Upton, New York. The Chicago Operations Office (CH) Manager appointed a Type B Accident Investigation Board (Board) to investigate the fire. In a June 16, 1994, letter to the Inspector General, DOE, the CH Manager requested the Inspector General to look into an allegation by a former Board member that senior Chicago management consciously violated the requirements of DOE Order 5484.1, {open_quotes}Environmental Protection, Safety, And Health Protection Information Reporting Requirements,{close_quotes} in attempting to control the investigation. The former Board member alleged that there was not a clear verbal agreement among the Board members regarding the focus of the scope of the investigation. He said that the Board Chairman wanted to focus on the physical causes of the fire, while he (the former Board member) believed that the Board should focus on the apparent management deficiencies that allowed TRISTAN to operate without a proper safety analysis and in violation of DOE orders for so many years.

NONE

1996-03-01T23:59:59.000Z

34

Public Scoping Meeting Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Public Scoping Meeting Materials Public Scoping Meeting Materials Public Scoping Meeting Materials Fact sheets, presentations, and other information from the Conversion EIS Public Scoping Meetings. The following materials were made available during the DUF6 Conversion EIS public scoping meetings held near Portsmouth, Ohio, Oak Ridge, Tennessee, and Paducah, Kentucky, November - December, 2001. Notice of Intent PDF Icon Notice of Intent to Prepare an Environmental Impact Statement for Depleted Uranium Hexafluoride Conversion Facilities 60 KB details Presentation PDF Icon Overview: Depleted Uranium Hexafluoride (DUF6) Management Program 5.97 MB details DUF6 Fact Sheets PDF Icon Overview of Depleted Uranium Hexafluoride Management Program 174 KB details PDF Icon NEPA Activities for the Depleted Uranium Hexafluoride Management Program

35

Video Shoot Scope of Work  

Broader source: Energy.gov [DOE]

Video Shoot Scope of Work, from the Tool Kit Framework: Small Town University Energy Program (STEP).

36

Decision Summaries  

Broader source: Energy.gov (indexed) [DOE]

oha/decision-summaries Office of Hearings and Appeals oha/decision-summaries Office of Hearings and Appeals 1000 Independence Ave., SW Washington, DC, 20585 202-287-1566 en Summary of Decisions - December 30, 2013 - January 3, 2014 http://energy.gov/oha/articles/summary-decisions-december-30-2013-january-3-2014 summary-decisions-december-30-2013-january-3-2014" class="title-link">Summary of Decisions - December 30, 2013 - January 3, 2014

37

Pinellas Remediation Agreement Summary  

Broader source: Energy.gov (indexed) [DOE]

Pinellas Pinellas Agreement Name Remediation Agreement for the Four and One-Half Acre Site in Largo, Pinellas County, Florida State Florida Agreement Type Remediation Agreement Legal Driver(s) CERCLA/ Atomic Energy Act of 1954, as amended/ Florida Air and Water Pollution Control Act Scope Summary Remediation of property adjacent to the former Pinellas Plant Parties DOE; Florida Department of Environmental Protection Date 3/12/2001 SCOPE * Remediate the groundwater under a parcel of property adjacent to DOE's former Pinellas Plant to levels consistent with industrial use. * Complete remedial actions at the site in accordance with a Remedial Action Plan prepared by DOE and approved by FDEP. * Submit quarterly reports of interim remedial actions at the Site.

38

E-Print Network 3.0 - amine-directed hydroboration scope Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Enynes Mediated by Metallocene Summary: system. Full delineation of the scope of this reaction will be the subject of future studies. Application... with formation of only 4%of...

39

Public Scoping Meeting Public Scoping Meeting David Levenstein  

Office of Legacy Management (LM)

Public Scoping Public Scoping Meeting Public Scoping Meeting David Levenstein EIS Document Manager David Levenstein EIS Document Manager 2 About Tonight's Scoping Meeting * Scoping is a required step in the National Environmental Policy Act (NEPA) process for preparing an environmental impact statement (EIS). * Scoping is the process of determining the subjects that will be considered and evaluated in an EIS. * Public comments - both oral and written - received during the scoping period are taken into account when decisions are made about the issues and alternatives to be analyzed in an EIS. * The scoping period for the Mercury Storage EIS began with publication in the Federal Register of DOE's Notice of Intent to prepare the Mercury Storage EIS on July 2, 2009; ends on August 17, 2009.

40

Climate Change Scoping Plan  

E-Print Network [OSTI]

Climate Change Scoping Plan a amework for change as approved Prepared by the California AirBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Climate Change Scoping Plan  

E-Print Network [OSTI]

Climate Change Scoping Plan a amework for change Prepared by the California Air Resources BoardBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

42

Program Summaries  

Office of Science (SC) Website

Program Summaries Program Summaries Basic Energy Sciences (BES) BES Home About Research Facilities Science Highlights Benefits of BES Funding Opportunities Basic Energy Sciences Advisory Committee (BESAC) News & Resources Program Summaries Brochures Reports Accomplishments Presentations BES and Congress Science for Energy Flow Seeing Matter Scale of Things Chart Contact Information Basic Energy Sciences U.S. Department of Energy SC-22/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3081 F: (301) 903-6594 E: sc.bes@science.doe.gov More Information » News & Resources Program Summaries Print Text Size: A A A RSS Feeds FeedbackShare Page Bes Summaries 2012 thumbnail JPG .jpg file (469KB) Basic Energy Sciences FY 2012 Research Summaries This report provides a collection of research abstracts and highlights for

43

Penn State Respiratory Protection Program Requirements Summary Scope and Application  

E-Print Network [OSTI]

operations, and during some non-routine or emergency operations such as a spill or leak of a hazardous respirators and evaluating hazards. · Select respiratory protection options. · Conduct fit testing. · Evaluate and do not cause discomfort. · Continually check work areas and operations to identify possible

Maroncelli, Mark

44

I. Definition and Scope  

Broader source: Energy.gov (indexed) [DOE]

- Smart Grid RFI Page 2 November 1, 2010 - Smart Grid RFI Page 2 November 1, 2010 I. Definition and Scope I.1. We invite comment however on whether this [Title XIII] is the best way to define the smart grid. What significant policy challenges are likely to remain unaddressed if we employ Title XIII's definition? If the definition is overly broad, what policy risks emerge as a result? * While Title XIII starts framing the necessary committee's and organizations needed to start outlining the Smart Grid discussion, it is lacking in the clear definition of the objectives that the Department of Energy (DOE) should be trying to convey to the public and industry. * Policy challenges will always continue to exist with a topic with the breadth and depth of Smart Grid. However, by steering the discussion towards what the objectives of Smart

45

Interviewee Travel Regulations Scope  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3/2012 3/2012 Interviewee Travel Regulations Scope These regulations apply to the reimbursement of round-trip travel expenses incurred by interviewees. These regulations do not apply to applicants who live within a 50-mile radius of Los Alamos based on the Rand McNally Standard Highway Mileage Guide. Reimbursement With the exception of airfare, interviewees will be reimbursed for travel expenses according to Federal travel regulations. For interviewees, airfare reimbursement is limited to the lesser of the standard coach airfare or the actual amount paid. The lowest available airfare should be obtained based on the official business dates and locations. The reimbursement amount will be based on the most direct route available between the interviewee's residence and the laboratory. Costs incurred over the lowest available fare will be the

46

Climate Change Proposed Scoping Plan  

E-Print Network [OSTI]

Climate Change Proposed Scoping Plan a amework for change Prepared by the California Air Resources #12;CLIMATE CHANGE SCOPING PLAN State of California Air Resources Board Resolution 08-47 December 11 greenhouse gas (GHG) emissions that cause global warming; WHEREAS, the adverse impacts of climate change

47

Science Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BL6-2C BL9-3 BL10-2 Share this Article Laboratree Ologeez SciLink LabSpaces Imaging Mercury in the Rhizosphere of Wetland Plants summary written by Raven Hanna High levels of...

48

Science Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Press Release Share this Article Laboratree Ologeez SciLink LabSpaces Reducing Fuel Cell Costs by Changing the Structure and Reactivity of Platinum summary written by Raven...

49

South Valley Compliance Agreement Summary  

Broader source: Energy.gov (indexed) [DOE]

South Valley South Valley Agreement Name South Valley Superfund Site Interagency Agreement State New Mexico Agreement Type Compliance Agreement Legal Driver(s) CERCLA Scope Summary Interagency Agreement with the U.S. Air Force for payment of costs associated with the remediation of two operable units (the facility and San Jose 6) at the South Valley Superfund Site. Parties DOE; U.S. Air Force Date 9/26/1990 SCOPE * Set forth the actions required of the USAF and DOE to fulfill their respective responsibilities pursuant to the Settlement Agreement between DOE, USAF, and General Electric Company (8/29/1990). * Establish mechanism by which DOE will transfer, to a fund managed by the USAF, its share of the costs set forth in the Settlement Agreement. * Set forth each party's responsibilities and respective share of costs.

50

Building Energy Data Exchange Specification Scoping Report |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Building Energy Data Exchange Specification Scoping Report Building Energy Data Exchange Specification Scoping Report The Building Energy Data Exchange Specification (BEDES),...

51

Energynet Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Summary Project Summary HELP Index Summary Scenario Reference Student Pages Subject/Content Area: Physical science/electricity, geometry and applied mathematics Target Audience: Middle school level - all students including gifted, learning-disabled, behavior-disordered and limited English proficient Project Goals: As a result of their participation in the Activating the EnergyNet project, the students will develop the abilities necessary to do scientific inquiry. They will increase their understanding of factors affecting energy cost and consumption, including the impact of energy production on the environment and the available technology and conversion costs. Students will use problem-solving strategies to design and implement interventions, assess the outcome, share data and strategies with other schools, and present

52

EIS-0458: Scoping Meeting Transcript  

Broader source: Energy.gov [DOE]

Transcript of the public scoping meeting on the draft EIS for the proposed loan guarantee for the First Solar Topaz Solar Farm Project in San Luis Obispo County, CA.

53

Executive Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Executive Summary Executive Summary Highway-based excise taxes are paid by highway users, and the tax revenues are distributed to States for supporting highways, safety, and transit programs. The processes for collecting these taxes and redistributing them to the States are very complex. The U.S. Treasury collects most of the taxes from a relatively small number of large corporations located in only a few States. The Internal Revenue Service (IRS) does not have an accurate picture of where the motor fuel is eventually consumed. Because the actual State-by-State contributions are not available, detailed analyses are required to estimate a State's on-highway motor fuel use. The attribution process uses State-reported data and nationally applied statistical models to determine how much fuel is used on highways in each State and the proportion of each State's usage in comparison to the total motor fuel usage for all States.

54

EXECUTIVE SUMMARY  

National Nuclear Security Administration (NNSA)

FUSION ENERGY SCIENCE ADVISORY COMMITTEE FUSION ENERGY SCIENCE ADVISORY COMMITTEE Panel on High Energy Density Laboratory Plasmas ADVANCING THE SCIENCE OF HIGH ENERGY DENSITY LABORATORY PLASMAS January 2009 UNITED STATES DEPARTMENT OF ENERGY 1 TABLE OF CONTENTS EXECUTIVE SUMMARY.......................................................................................... 5 1 HIGH ENERGY DENSITY LABORATORY PLASMA SCIENCE .................................... 15 2 THE CHARGE TO FESAC ...................................................................................... 19 3 THE PANEL PROCESS ............................................................................................ 20 4 STEWARDSHIP OF THE JOINT PROGRAM ............................................................... 23

55

FedScope Employment Cube (September 2011) | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

September 2011) September 2011) BusinessUSA Data/Tools Apps Challenges Let's Talk BusinessUSA You are here Data.gov » Communities » BusinessUSA » Data FedScope Employment Cube (September 2011) Dataset Summary Description This raw data set provides Federal civilian employee population data as of September 2011. The scope of this raw data set includes all data elements used in the creation of the FedScope Employment Cube (http://www.fedscope.opm.gov/). The following workforce characteristics are available for analysis: Agency, State/Country, Occupation, Occupation Category, Pay Plan & Grade, GS & Equivalent Grade, Salary Level ($10,000 interval), Work Schedule, Type of Appointment, Gender, Age (5 year interval), Length of Service (5 year interval), Employment, Average Salary, and Average Length of Service. Starting in FY 2010, the OPM Enterprise Human Resources Integration-Statistical Data Mart (EHRI-SDM) is the source for all FedScope data. Data is processed on a quarterly basis (i.e. March, June, September and December).

56

FedScope Employment Cube (December 2011) | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

December 2011) December 2011) BusinessUSA Data/Tools Apps Challenges Let's Talk BusinessUSA You are here Data.gov » Communities » BusinessUSA » Data FedScope Employment Cube (December 2011) Dataset Summary Description This raw data set provides Federal civilian employee population data as of December 2011. The scope of this raw data set includes all data elements used in the creation of the FedScope Employment Cube (http://www.fedscope.opm.gov/). The following workforce characteristics are available for analysis: Agency, State/Country, Occupation, Occupation Category, Pay Plan & Grade, GS & Equivalent Grade, Salary Level ($10,000 interval), Work Schedule, Type of Appointment, Gender, Age (5 year interval), Length of Service (5 year interval), Employment, Average Salary, and Average Length of Service. Starting in FY 2010, the OPM Enterprise Human Resources Integration-Statistical Data Mart (EHRI-SDM) is the source for all FedScope data. Data is processed on a quarterly basis (i.e. March, June, September and December).

57

Executive Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Worker Safety and Health Program LBNL/PUB-3851, Rev. 2.2 (March 2012) Worker Safety and Health Program LBNL/PUB-3851, Rev. 2.2 (March 2012) Worker Safety and Health Program Lawrence Berkeley National Laboratory LBNL Worker Safety and Health Program LBNL/PUB-3851, Rev. 2.2 (March 2012) This page intentionally left blank. LBNL Worker Safety and Health Program LBNL/PUB-3851, Rev. 2.2 (March 2012) i Contents Executive Summary .............................................................................................. v 1. Introduction................................................................................................... 1 1.1 Work Activities .............................................................................................. 1

58

Climate Change Proposed Scoping Plan  

E-Print Network [OSTI]

Climate Change Proposed Scoping Plan a amework for change Prepared by the California Air ResourcesBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

59

SCOPE-Zhongyu Young Scientist  

E-Print Network [OSTI]

and research on best management practices. The Scientific Committee on Problems of the Environment (SCOPESCOPE-Zhongyu Young Scientist Environmental Awards 2011 The SCOPE-Zhongyu Environmental Awards were to the improvement of the world environment through promotion of environmental sciences, technological advances

Wang, Wei Hua

60

EIS-0504: Notice of Extension of Scoping Period | Department...  

Broader source: Energy.gov (indexed) [DOE]

Extension of Scoping Period EIS-0504: Notice of Extension of Scoping Period Gulf LNG Liquefaction Project, Jackson County, Mississippi FERC extended the scoping period to September...

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Notice of Public Scoping Meetings and Extention of Scoping Period  

Broader source: Energy.gov (indexed) [DOE]

678 Federal Register 678 Federal Register / Vol. 76, No. 140 / Thursday, July 21, 2011 / Notices you must have Adobe Acrobat Reader, which is available free at this site. You may also access documents of the Department published in the Federal Register by using the article search feature at http:// www.federalregister.gov. Specifically, through the advanced search feature at this site, you can limit your search to documents published by the Department. Dated: July 18, 2011. Eduardo M. Ochoa, Assistant Secretary for Postsecondary Education. [FR Doc. 2011-18454 Filed 7-20-11; 8:45 am] BILLING CODE 4000-01-P DEPARTMENT OF ENERGY Notice of Public Scoping Meetings and Extension of Scoping Period for the U.S. Department of Energy Uranium Leasing Program Programmatic Environmental Impact Statement

62

Science Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

July 30, 2009 July 30, 2009 » Links Scientific Highlight Center for Advanced Molecular Photovoltaics, Stanford University » Share this Article Laboratree Ologeez SciLink LabSpaces Molecular Mixing in Organic Solar Cells summary written by Raven Hanna Solar panels contain a number of solar cells that convert light into electricity. Solar cells are traditionally made of crystalline silicon, which presently have 15-20% efficiency in conversion of light into electricity. However, these traditional cells are bulky and have high production costs that can take 5-7 years of solar panel operation to recover. Using solar cells made from organic materials could lower their production costs. This would lessen the time it takes for solar panels to generate more energy than consumed during production and would also result

63

Science Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

pseudogap image pseudogap image » Links Scientific Highlight SIMES Shen Lab SLAC Today Article » Share this Article Laboratree Ologeez SciLink LabSpaces Scientists Find Unexpected Electron Behavior in the Pseudogap of High-temperature Superconductors summary written by Raven Hanna Superconductivity is a hot topic in physics for good reason. With an electrical resistance of zero, superconductors transport electrical current with no loss of energy. Unfortunately, scientists have only found materials to be superconducting at very low temperatures, much too low for widespread use. In the 1980s, scientists discovered a class of "high-temperature" superconductors that can be used at the temperature of liquid nitrogen (~-200°C). This discovery has raised scientists' hopes that materials may

64

EXECUTIVE SUMMARY  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EXECUTIVE SUMMARY This document contains an assessment of the first project to be completed under the U.S. Department of Energy Clean Coal Technology Program. The project was selected under Round I and is known officially as "The Demonstration of an Advanced Cyclone Coal Combustor, with Internal Sulfur, Nitrogen, and Ash Control for the Conversion of a 23 MMBtu/hour Oil-Fired Boiler to Pulverized Coal." The project was carried out by the Coal Tech Corporation over the period March 1987 February 1991 at the site of the Keeler/Dorr-Oliver Boiler Company in Williamsport, Pennsylvania. The project was a three-year demonstration scale test of a 30 MMBtu/hr air-cooled ceramic slagging cyclone combustor retrofitted to a horizontal 23-MMBtu/hr oil or natural gas-fired Keeler/Dorr-Oliver DS-9

65

Science Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hasan Research Hasan Research Princeton News Release » Share this Article Laboratree Ologeez SciLink LabSpaces Macroscopic Quantum Insulator State Observed summary written by Raven Hanna One of the strangest consequences of quantum mechanics is the seemingly instantaneous communication of subatomic particles over long distances. Known as quantum entanglement, pairs or groups of particles can become linked so that any changes made to one will cause the others to respond quicker than the time it takes for light to travel between them. Scientists are interested in finding a material that shows quantum entanglement on a macroscopic scale but which is neither a superconductor nor a superfluid. Dubbed a topological insulator, this theorized, exotic state of matter would have unusual conducting properties. For example,

66

Science Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

03, 2008 03, 2008 » Links Scientific Highlight Tainer Website Scripps Press Release » Share this Article Laboratree Ologeez SciLink LabSpaces Role of Specific Protein Mutations in Causing Human Disease Revealed summary written by Brad Plummer, SLAC Communication Office Scientists are one step closer to understanding a piece of the machinery involved in DNA transcription and repair, thanks to work done in part at the SSRL macromolecular crystallography Beam Line 11-1. The team, led by The Scripps Research Institute researcher John Tainer, and colleagues worked out the structure of an important enzyme call XPD, a member of the helicase family of enzymes, found in all living organisms. The results were published in the May 2008 edition of the journal Cell. In eukaryotes, XPD is responsible for unwinding double-stranded DNA

67

Science Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

February 25, 2010 February 25, 2010 seafloor_biofilms Image of pillow basalts from inside the Pisces Submersible. » Links Scientific Highlight Templeton Lab EMSL News Imaging at SSRL » Share this Article Laboratree Ologeez SciLink LabSpaces Researchers Discover an Unexpected Source of Energy for Deep-sea Microbial Communities summary written by Raven Hanna New rock formed by deep undersea volcanoes does not stay bare long. Microbes quickly move onto these basalts to form communities in the form of biofilms. As these biofilms grow and develop, they change the geology of their environment, forming mineral deposits. Since many of these communities are deep in the cold ocean waters, where sunlight does not reach, they must use alternative sources of energy. What these might be is unknown, but a common theory posits that the microbes may be obtaining

68

Science Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10 10 image Outside view of the T=4 subunit arrangement. » Links Scientific Highlight Johnson Lab » Share this Article Laboratree Ologeez SciLink LabSpaces Following the pH-dependent Conformational Changes of a Maturing Viral Capsid summary written by Raven Hanna The capsid that surrounds viruses is formed from subunit proteins that interact in specific ways to form a tight shell. The processes of coming together and forming interactions are multistep and complex and are fundamental events to acquire viral infectivity. The capsid maturation process of the Nudaurelia capensis omega virus includes pH-dependant conformational changes and auto-proteolysis. Like many human viruses such as HIV and herpes virus, NwV, an insect virus, requires these specific structural changes to become infectious.

69

Science Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

25, 2008 25, 2008 » Links Scientific Highlight Saphire Website Scripps Press Release Tracking Ebola, Scripps At the Forefront » Share this Article Laboratree Ologeez SciLink LabSpaces Revealing a Structural Weakness of the Deadly Ebolavirus summary written by Brad Plummer, SLAC Communication Office Scientists are one step closer to conquering the deadly Ebolavirus, thanks to research conducted at SSRL structural biology Beam Lines 9-2 and 11-1 and ALS Beam Line 5.02 by a team of researchers led by Erica Ollmann Saphire from The Scripps Research Institute. The results were published in the July 10 edition of the journal Nature. Using macromolecular crystallography techniques, the team solved the structure of a protein on the Ebolavirus's surface, called glycoprotein GP,

70

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12 generally cannot be achieved for reasonable computational cost. Applications that require modeling, and in nondestructive testing. The objective of this project is to advance the state of the art in electromagnetic

Perkins, Richard A.

71

Student FTE Summary Student FTE Summary  

E-Print Network [OSTI]

Student FTE Summary Fall 2010 #12;1 Student FTE Summary Fall Term 2010 Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 Percentage of Student FTE by College. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3 Student FTE by Student Level

72

Scoping  

Science Journals Connector (OSTI)

Examples of the different experiment types are given by the series of experiments conducted at NASA-SEL[10], aimed at evaluation of Cleanroom principles and techniques. Cleanroom is a collection of engineering m...

Claes Wohlin; Per Runeson; Martin Hst

2012-01-01T23:59:59.000Z

73

Webinar Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Webinar Summary Page 1 TC&WM EIS Webinar December 10, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD WEBINAR: FINAL TANK CLOSURE AND WASTE MANAGEMENT ENVIRONMENTAL IMPACT...

74

STEP Financial Incentives Summary  

Broader source: Energy.gov [DOE]

STEP Financial Incentives Summary, from the Tool Kit Framework: Small Town University Energy Program (STEP).

75

Administrative Order, June 13, 2000 Summary  

Broader source: Energy.gov (indexed) [DOE]

Administrative Order No. 00NWPKW-1251 Administrative Order No. 00NWPKW-1251 State Washington Agreement Type Administrative Order Legal Driver(s) RCRA Scope Summary Resolve Ecology's October 12, 1999 finding that DOE failed to complete Major TPA Milestone M-32 with respect to Double-Shell Tank (DST) integrity assessments Parties DOE; CH2M Hill Hanford Group; State of Washington Department of Ecology Date 6/13/2000 SCOPE * Require DOE and CH2M Hill Hanford Group to comply with the Revised Code of Washington, HWMA, Washington Administrative Code, the Dangerous Waste Regulations, and by reference, the CFR by taking actions which are described in this Order. * Resolve Ecology's October 12, 1999 finding that DOE failed to complete Major TPA Milestone M-32 with respect to Double-Shell Tank (DST) integrity assessments.

76

Tank Stabilization September 30, 1999 Summary  

Broader source: Energy.gov (indexed) [DOE]

United States Court Easter District of Washington United States Court Easter District of Washington Consent Decree (as amended on September 19, 2000.) State Washington Agreement Type Consent Decree Legal Driver(s) RCRA Scope Summary Renegotiate a schedule to pump liquid radioactive hazardous waste from single-shell tanks to double-shell tanks Parties DOE; State of Washington, Department of Ecology Date 09/30/1999; Amended 09/19/2000 SCOPE * Address DOE's obligations to the State of Washington, Department of Ecology concerning missed and remaining milestones under the Hanford Federal Facility Agreement (HFFACO) and Consent Order of May 15, 1989. * Establish a judicially enforceable schedule for pumping radioactive hazardous waste from single-shell to double-shell tanks. ESTABLISHING MILESTONES

77

2012 Wind Technologies Market Report Summary  

Wind Powering America (EERE)

Efficiency & Renewable Energy eere.energy.gov Efficiency & Renewable Energy eere.energy.gov 1 Program Name or Ancillary Text eere.energy.gov WIND AND WATER POWER PROGRAM 1 2012 Wind Technologies Market Report Summary Ryan Wiser, Ph.D. Lawrence Berkeley National Laboratory WPA All-States Summit May 8, 2013 WIND AND WATER POWER PROGRAM 2 2012 Wind Technologies Market Report Purpose, Scope, and Data: * Publicly available annual report summarizing key trends in the U.S. wind power market, with a focus on 2012 * Scope primarily includes wind turbines over 100 kW in size * Separate DOE-funded annual reports on distributed and offshore wind * Data sources include AWEA, EIA, FERC, SEC, etc. (see full report) Report Authors: * Primary authors: Ryan Wiser and Mark Bolinger, Berkeley Lab * Contributions from others at Berkeley Lab, Exeter Associates, NREL

78

Position Summary Employee Details  

E-Print Network [OSTI]

landscape maintenance within the UC Davis Arboretum. Daily assignments are provided under the direction to assist with landscape maintenance. Campus Job Scope: Department Specific Job Scope: The UC Davis% LANDSCAPE MAINTENANCE -Provide care and maintenance of plants, shrubs, trees, hedges, flowers, lawns, fields

California at Davis, University of

79

Monticello Mill site Federal Facility Agreement, December 22, 1988 Summary  

Broader source: Energy.gov (indexed) [DOE]

Monticello Monticello Agreement Name Monticello (Utah) Site: Monticello Vicinity Properties NPL Site and Monticello Millsite Federal Facility Agreement Pursuant to CERCLA Section 120, December 22, 1988 State Utah Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the Site Parties DOE; US EPA; State of Utah Department of Environmental Health Date 12/22/1988 SCOPE * Identify Interim Remedial Action (IRA) alternatives, if any, which are appropriate at the Site prior to the implementation of final remedial actions for the Site. * Evaluate all past investigative and response actions taken at the Site and documented

80

Summaries of FY 1995 geosciences research  

SciTech Connect (OSTI)

The summaries in this document, prepared by the investigators, describe the scope of the individual programs. The Geosciences Research Program includes research in geophysics, geochemistry, resource evaluation, solar-terrestrial interactions, and their subdivisions including earth dynamics, properties of earth materials, rock mechanics, underground imaging, rock-fluid interactions, continental scientific drilling, geochemical transport, solar/atmospheric physics, and modeling, with emphasis on the interdisciplinary areas. All such research is related either direct or indirect to the Department of Energy`s long-range technological needs.

NONE

1995-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Summaries of physical research in the geosciences  

SciTech Connect (OSTI)

The Department of Energy supports research in the geosciences in order to provide a sound foundation of fundamental knowledge in those areas of earth, atmospheric, and solar-terrestrial sciences that are germane to the Department of Energy's many missions. The summaries describe the scope of the individual programs and detail the research performed during 1980 to 1981. The Geosciences Research Program includes research in geology, petrology, geophysics, geochemistry, hydrology, solar-terrestrial relationships, aeronomy, seismology, and natural resource analysis, including the various subdivisions and interdisciplinary areas.

Not Available

1981-10-01T23:59:59.000Z

82

Demand Responsive Lighting: A Scoping Study  

E-Print Network [OSTI]

LBNL-62226 Demand Responsive Lighting: A Scoping Study F. Rubinstein, S. Kiliccote Energy Environmental Technologies Division January 2007 #12;LBNL-62226 Demand Responsive Lighting: A Scoping Study in this report was coordinated by the Demand Response Research Center and funded by the California Energy

83

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12;22 Math & Computational Sciences Division generally cannot be achieved for reasonable computational cost. Applications that require modeling of this project is to advance the state of the art in electromagnetic computations by eliminating three existing

Perkins, Richard A.

84

EIS-0472: Notice of Public Scoping Meetings and Extension of Scoping Period  

Broader source: Energy.gov (indexed) [DOE]

472: Notice of Public Scoping Meetings and Extension of 472: Notice of Public Scoping Meetings and Extension of Scoping Period EIS-0472: Notice of Public Scoping Meetings and Extension of Scoping Period Uranium Leasing Program Programmatic Environmental Impact Statement Comment Period Ends: 09/09/11 Submit Comments to: Laura Kilpatrick, Esq. DOE ULP Program Manager Office of Legacy Management U.S. Department of Energy 11025 Dover Street, Suite 1000 Westminster, CO 80021 Electronic comments: http://ulpeis.anl.gov Electronic mail: ulpeis@anl.gov DOE will host public scoping meetings in western Colorado to receive comments on the scope of the DOE Uranium Leasing Program (ULP) Programmatic Environmental Impact Statement (hereinafter referred to as the ULP PEIS). The PEIS will analyze the reasonably foreseeable environmental impacts,

85

EIS-0472: Notice of Public Scoping Meetings and Extension of Scoping Period  

Broader source: Energy.gov (indexed) [DOE]

2: Notice of Public Scoping Meetings and Extension of 2: Notice of Public Scoping Meetings and Extension of Scoping Period EIS-0472: Notice of Public Scoping Meetings and Extension of Scoping Period Uranium Leasing Program Programmatic Environmental Impact Statement Comment Period Ends: 09/09/11 Submit Comments to: Laura Kilpatrick, Esq. DOE ULP Program Manager Office of Legacy Management U.S. Department of Energy 11025 Dover Street, Suite 1000 Westminster, CO 80021 Electronic comments: http://ulpeis.anl.gov Electronic mail: ulpeis@anl.gov DOE will host public scoping meetings in western Colorado to receive comments on the scope of the DOE Uranium Leasing Program (ULP) Programmatic Environmental Impact Statement (hereinafter referred to as the ULP PEIS). The PEIS will analyze the reasonably foreseeable environmental impacts,

86

BETTER BUILDINGS PARTNER SUMMARIES  

Broader source: Energy.gov [DOE]

In addition to Better Buildings Neighborhood Program Summary of Reported Data From July 1, 2010 September 30, 2013, each document below presents a summary of data reported by an organization...

87

Summaries of PIE Reports  

Science Journals Connector (OSTI)

In the following section, summary reports of the Process Improvement Experiments are presented that have been assigned to the Problem Domain Software Quality, Testing, Validation and Verification. These summaries...

Michael Haug; Eric W. Olsen; Luisa Consolini

2001-01-01T23:59:59.000Z

88

Air Quality Scoping Study for Beatty, Nevada (EMSI April 2007)  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energys Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at seven sites outside the NTS, including Ash Meadows National Wildlife Refuge, Sarcobatus Flat, Beatty, Rachel, Caliente, Pahranagat National Wildlife Refuge, and Crater Flat, and at four sites on the NTS. The trailer is stationed at any one site for approximately eight weeks at a time. Letter reports provide summaries of air quality and meteorological data, on completion of each sites sampling program.

Johann Engelbrecht, Ilias Kavouras, Dave Campbell, Scott Campbell, Steven Kohl and David Shafer

2007-04-01T23:59:59.000Z

89

Air Quality Scoping Study for Rachel, Nevada (EMSI April 2007)  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energys Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at seven sites outside the NTS, including Ash Meadows National Wildlife Refuge, Sarcobatus Flat, Beatty, Rachel, Caliente, Pahranagat National Wildlife Refuge, and Crater Flat, and at four sites on the NTS. The trailer is stationed at any one site for approximately eight weeks at a time. Letter reports provide summaries of air quality and meteorological data, on completion of each sites sampling program.

Johann Engelbrecht, Ilias Kavouras, Dave Campbell, Scott Campbell, Steven Kohl and David Shafer

2007-04-01T23:59:59.000Z

90

Las Vegas Roundtable Summary  

Broader source: Energy.gov [DOE]

Summary report from the DOE Office of Indian Energy roundtable held on March 16, 2011, in Las Vegas, Nevada.

91

EIS-0403: Notice to Extend Public Scoping | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

to Extend Public Scoping EIS-0403: Notice to Extend Public Scoping Solar Energy Development in Six Southwestern States DOE and BLM (the Agencies) extended the comment period for...

92

EIS-0429: Scoping Meeting Transcript, 12/3/2009 | Department...  

Broader source: Energy.gov (indexed) [DOE]

1232009 EIS-0429: Scoping Meeting Transcript, 1232009 Indiana Gasification, LLC, Industrial Gasification Facility in Rockport, IN and CO2 Pipeline Public Scoping Meeting - 12...

93

EIS-0489: Notice of Additional Public Scoping Meetings | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Public Scoping Meetings EIS-0489: Notice of Additional Public Scoping Meetings Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project...

94

Hydrogen Supply: Cost Estimate for Hydrogen Pathways-Scoping...  

Broader source: Energy.gov (indexed) [DOE]

Supply: Cost Estimate for Hydrogen Pathways-Scoping Analysis. January 22, 2002-July 22, 2002 Hydrogen Supply: Cost Estimate for Hydrogen Pathways-Scoping Analysis. January 22,...

95

EA-1903-NoticeofScoping-2012.pdf  

Broader source: Energy.gov (indexed) [DOE]

SCOPING SCOPING The U.S. Department of Energy (DOE) is requesting public input on the scope of environmental issues and alternatives to be addressed in the: Environmental Assessment Kansas State Univ. Zond Wind Energy Project Manhattan, Kansas The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to Kansas State University (KSU) to refurbish, install, operate, and maintain a 750- kilowatt Zond wind turbine on KSU property north of Manhattan, Kansas. An Environmental Assessment (EA) will be prepared by DOE pursuant to the requirements of the National Environmental Policy Act (NEPA). The notice of scoping and description of the proposed project is available for review at the DOE Electronic Public Reading Room at:

96

The Scope and History of Electrochemical Engineering  

Science Journals Connector (OSTI)

The Scope of Electrochemical Engineering was the title of a contribution of Carl Wagner in the second volume of Advances in Electrochemistry and Electrochemical Engineering in 1962. On ten pages he described s...

Prof. Dr. Hartmut Wendt; Prof. Dr. Gerhard Kreysa

1999-01-01T23:59:59.000Z

97

Report on the Scope of the Accident Investigation of the Tristan Fire at the DOE Brookhaven National Laboratory, IG-0386  

Broader source: Energy.gov (indexed) [DOE]

4/93) 4/93) United States Government Department of Energy memorandum DATE: MARCH 15, 1996 REPLY TO ATTN OF: IG-1 SUBJECT: INFORMATION: Report on lSummary Results of the Inspection of Issues Regarding the Scope of the Accident Investigation of the TRISTAN Fire at the Brookhaven National Laboratoryn TO: The Secretary BACKGROUND: The subject final report is provided to inform you of our findings and recommendations concerning our review of issues regarding the scope of the accident investigation of a March 31, 1994, fire at the Terrific Reactor Isotope Separator To Analyze Nuclides (TRISTAN) experiment at the Department of Energy (DOE) Brookhaven National Laboratory

98

Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and  

Broader source: Energy.gov (indexed) [DOE]

Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and Participants in Scoping Scoping Guidance: Memorandum for General Counsels, NEPA Liaisons, and Participants in Scoping This Council on Environmental Quality scoping guidance document consists of advice on what works and what does not, based on the experience of many agencies and other participants in scoping. It is intended to make generally available the results of the Council's research, and to encourage the use of better techniques for ensuring public participation and efficiency in the scoping process. CEQ_Scoping_Guidance.pdf More Documents & Publications Memorandum for General Counsels, NEPA Liaisons and Participants in Scoping A Citizen's Guide to the NEPA: Having Your Voice Heard

99

Prioritize Strategies and Set Internal Reduction Targets for Scope 3  

Broader source: Energy.gov (indexed) [DOE]

Strategies and Set Internal Reduction Targets for Scope Strategies and Set Internal Reduction Targets for Scope 3 Greenhouse Gas Emissions Prioritize Strategies and Set Internal Reduction Targets for Scope 3 Greenhouse Gas Emissions October 7, 2013 - 10:22am Addthis The final steps in the greenhouse gas (GHG) mitigation planning process for Scope 3 emissions include: Prioritizing strategies across all Scope 3 emission sources Setting internal Scope 3 reduction targets. Prioritizing All Scope 3 Strategies Once the Federal agency understands what Scope 3 reductions are feasible and at what costs, it should prioritize proposed GHG reduction activities across all Scope 3 emission sources. This prioritization will help agencies determine how to get the most out of limited resources for Scope 3 mitigation. It will also assist in developing more informed targets at the

100

Essential Services Meeting Summary  

SciTech Connect (OSTI)

This summary of proceedings report focuses on an end-of-grant meeting at which grantees for Project Area 5 were convened.

HCTT CHE

2010-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

XRM2005 Conference Summary  

E-Print Network [OSTI]

some of the other organizers. (from the Conference web site)XRM 2005 Conference Summary Janos Kirz Advanced LightThe presentations at the Conference covered the latest

Kirz, Janos

2005-01-01T23:59:59.000Z

102

Final Meeting Summary ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Health, Safety, and Environmental Protection Committee November 8, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH SAFETY AND ENVIRONMENTAL PROTECTION COMMITTEE November...

103

ScopingStudyReport-AppxC-Homework-013105.doc -1 -DEMAND RESPONSE RESEARCH CENTER SCOPING  

E-Print Network [OSTI]

ScopingStudyReport-AppxC-Homework-013105.doc - 1 - DEMAND RESPONSE RESEARCH CENTER SCOPING STUDYStudyReport-AppxC-Homework-013105.doc - 2 - Preparing for the Roundtable Session (HOMEWORK ASSIGNMENT) The PIER Demand Response that advances the near-term adoption of Demand Response technologies, policies, programs, strategies

104

Studies on intrinsic summary evaluation  

Science Journals Connector (OSTI)

Summary evaluation has gained importance in the research community and seems to be a quite challenging task. Most of the work till date focus on summary generation, while this paper focus on intrinsic summary evaluation. Studies made for preparing the ... Keywords: effectiveness, extraction, inter judge agreement, intrinsic summary evaluation, precision, rank correlation, recall, summarisation, text summary, utility mechanisms

Shanmugasundaram Hariharan; Rengaramanujam Srinivasan

2010-04-01T23:59:59.000Z

105

Mass Market Demand Response and Variable Generation Integration Issues: A Scoping Study  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mass Market Demand Response and Mass Market Demand Response and Mass Market Demand Response and Mass Market Demand Response and Variable Generation Integration Issues: Variable Generation Integration Issues: Variable Generation Integration Issues: Variable Generation Integration Issues: A Scoping Study A Scoping Study Peter Cappers, Andrew Mills, Charles Goldman, Ryan Wiser, Joseph H. Eto Report Summary October 2011 Energy Analysis Department  Electricity Markets and Policy Group 1 1 Presentation Overview Presentation Overview  Objectives and Approach  Variable Generation Resources and the Bulk Power System  Demand Response Opportunities  Demand Response as a Strategy to Integrate p gy g Variable Generation Resources  Comparison of Various Strategies to Integrate Variable Generation  Conclusions Energy Analysis Department  Electricity Markets and Policy Group

106

SUMMARY REPORT ANNUAL IABP MEETING  

E-Print Network [OSTI]

SUMMARY REPORT THE 7TH ANNUAL IABP MEETING St. Petersburg, Russia, 3 - 6 June 1997 #12;IABP-7 Summary Report 2 Table of Contents Summary Report-ordinator's Report.......................................................... 20 5. Report of the Data Buoy Co

Rigor, Ignatius G.

107

Nuclear Safety Workshop Summary  

Broader source: Energy.gov (indexed) [DOE]

Workshop Summary Workshop Summary September 19-20, 2012 1 Nuclear Safety Workshop Summary On September 19-20, 2012, the U.S. Department of Energy (DOE) held a second Nuclear Safety Workshop covering the results of the Department's actions to improve its posture for analyzing and responding to severe accidents in light of lessons learned from the March 2011 nuclear accident in Japan. Sponsored by DOE and championed by Deputy Secretary of Energy Daniel Poneman, the two-day workshop discussed the lessons learned in a national and international context. The workshop's theme

108

Saltcreek Project Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Summary Project Summary HELP Index Summary Scenario References Student Pages Subject/Content Area: Environmental Science Target Audience: Middle school level - all students, including gifted, learning-disabled, behavior-disordered and limited English proficient Project Goals: As a result of their participation in the Salt Creek Investigation, the students will develop the abilities necessary to do scientific inquiry. They will increase their understanding of factors affecting environmental quality, including the interdependence of organisms, and human-induced hazards. Students will learn how science and technology can help people solve local, national and global environmental problems. Learner Outcomes: Students will: be able to carry out six types of stream monitoring tests.

109

Compilation of ETR Summaries  

Broader source: Energy.gov (indexed) [DOE]

Summaries Summaries Office of Technology Innovation and Development Office of Environmental Management November 2011 External Technical Review Summaries Number Title Report Date ETR-1 Flowsheet for the Hanford Waste Treatment Plant (WTP) March 2006 ETR-2 Tank 48 at the Savannah River Site (SRS) August 2006 ETR-3 Demonstration Bulk Vitrification System (DBVS) for Low Activity Waste (LAW) at Hanford September 2006 ETR-4 Salt Waste Processing Facility Design at the Savannah River Site (SRS) November 2006 ETR-5 Remedial System Performance Improvement for the 200-ZP-1/PW-1 Operable Units at Hanford February 2007 ETR-6 Operational Issues at the Environmental Restoration

110

Laser Safety Manual Scope and Applicability  

E-Print Network [OSTI]

Laser Safety Manual Scope and Applicability This manual applies to all personnel working at or visiting ASU who procure or utilize Class III and Class IV lasers and laser systems. Procurement and user of Class I and Class II laser equipment, such as laser pointers and compact disk players, do not normally

Rhoads, James

111

Building Energy Data Exchange Specification Scoping Report  

Broader source: Energy.gov [DOE]

Building Energy Data Exchange Specification Scoping Report. The Building Energy Data Exchange Specification (BEDES), developed by DOE, is a uniform format is intended to make it easier for external stakeholders to use DOE tools, streamline reporting for DOE programs, and help unlock the full utility of the data that the DOE collects.

112

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

June 5, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT & COMMUNICATION COMMITTEE June 5, 2013 Richland, WA Topics in this Meeting Summary Opening...

113

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

October 11, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY AND ENVIRONMENTAL PROTECTION COMMITTEE October 11, 2012 Richland, WA Topics in this Meeting Summary...

114

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

August 9, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD HEALTH, SAFETY AND ENVIRONMENTAL PROTECTION COMMITTEE August 9, 2012 Richland, WA Topics in this Meeting Summary Opening...

115

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE October 7, 2014 Richland, WA Topics in this Meeting Summary Opening ......

116

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

March 5, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT COMMITEE March 5, 2014 Kennewick, WA Topics in this Meeting Summary Welcome and Introduction...

117

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

September 3, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT COMMITTEE September 3, 2014 Pasco, WA Topics in this Meeting Summary Welcome ......

118

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

October 8, 2014 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD TANK WASTE COMMITTEE October 8, 2014 Richland, WA Topics in this Meeting Summary Opening ......

119

Executive Summary | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Summary Executive Summary How clean energy investments can be used to spur local economic development. Spurring Local Economic Development with Clean Energy Investments:...

120

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

March 6, 2013 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU COMMITTEE March 6, 2013 Richland, WA Topics in this Meeting Summary Opening ......

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

meeting (May), but to meet Ecology's submittal timeline, the committee agreed to review the summary and adopt it via email. Ecology will include the final meeting summary...

122

Summaries of FY 1993 geosciences research  

SciTech Connect (OSTI)

The Department of Energy supports research in the geosciences in order to provide a sound foundation of fundamental knowledge in those areas of the geosciences that are germane to the DOE`s many missions. The Geosciences Research Program is supported by the Office of Energy Research. The participants in this program include DOE laboratories, academic institutions, and other governmental agencies. These activities are formalized by a contract or grant between the DOE and the organization performing the work, providing funds for salaries, equipment, research materials, and overhead. The summaries in this document, prepared by the investigators, describe the scope of the individual programs. The Geosciences Research Program includes research in geophysics, geochemistry, resource evaluation, solar-terrestrial interactions, and their subdivisions including earth dynamics, properties of earth materials, rock mechanics, underground imaging, rock-fluid interactions, continental scientific drilling, geochemical transport, solar-atmospheric physics, and modeling, with emphasis on the interdisciplinary areas.

Not Available

1993-12-01T23:59:59.000Z

123

NISE 2012 Award Summaries  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Table 2012 NISE Awards Summary Table Investigator NERSC repo Hours awarded DOE Office Project Title Gilbert Compo, University of Colorado at Boulder m958 10,000,000 BER Climate...

124

SSRL29 Workshop Summaries  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workshop Summaries X-ray Imaging and Spectro-microscopy: the Present and the Future< font> (Chairs: John Miao and Keith Hodgson) This workshop provided a forum to discuss the...

125

EIS-0463: Extension of Scoping Period | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Extension of Scoping Period Extension of Scoping Period EIS-0463: Extension of Scoping Period Presidential Permit Application for Northern Pass Transmission, New Hampshire The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). In anticipation of additional alternative route information being provided by Northern Pass, DOE is reopening the scoping period. DOE will determine the close of the scoping period once the additional routing information is received from Northern Pass, and DOE will provide at least 45 days for public review and scoping comments on any such routing information. EIS-0463-ScopingExtension-2011.pdf More Documents & Publications Application for presidential permit OE Docket No. PP-371 Northern Pass

126

EA-1852: Notice of Scoping | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Notice of Scoping EA-1852: Notice of Scoping Cloud County Community College Wind Energy Technology Project, Cloud County, Kansas U.S. Department of Energy (DOE) is proposing to...

127

EIS-0472: Notice of Public Scoping Meetings and Extension of...  

Broader source: Energy.gov (indexed) [DOE]

ulpeis.anl.gov Electronic mail: ulpeis@anl.gov DOE will host public scoping meetings in western Colorado to receive comments on the scope of the DOE Uranium Leasing Program (ULP)...

128

EIS-0286: Notice of Revised Scope | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Notice of Revised Scope EIS-0286: Notice of Revised Scope Hanford Site Solid (Radioactive and Hazardous) Waste Program The U.S. Department of Energy (DOE) has decided to revise the...

129

STEP Participant Survey Executive Summary  

Broader source: Energy.gov [DOE]

STEP Participant Survey Executive Summary, from the Tool Kit Framework: Small Town University Energy Program (STEP).

130

Philadelphia Summary of Reported Data  

Broader source: Energy.gov [DOE]

Summary of data reported by Better Buildings Neighborhood Program partner Philadelphia, Pennsylvania.

131

Portsmouth Ohio v. DOE September 1, 1989 Summary  

Broader source: Energy.gov (indexed) [DOE]

State of Ohio vs. United States Department of Energy, State of Ohio vs. United States Department of Energy, Divested Atomic Corporation, et. al Consent Decree (Civil Action #C2-89-732) State Ohio Agreement Type Consent Decree Legal Driver(s) RCRA Scope Summary Establish requirements and schedule of work to be performed in regard to the complaint filed by the State of Ohio on 29 August 1989. Parties DOE; Divested Atomic Corporation; State of Ohio Date 9/1/1989 SCOPE * Establish requirements and schedule of work to be performed in regard to the complaint filed by the State of Ohio on 29 August 1989 * Ensure the safe handling of hazardous waste, mixed waste, PCBs, solid waste, and water pollutants at Portsmouth. ESTABLISHING MILESTONES * Unless otherwise specified within the Consent Decree, actions are required to be

132

Final Rocky Flats Cleanup Agreement, July 19, 1996 Summary  

Broader source: Energy.gov (indexed) [DOE]

Rocky Flats Cleanup Agreement Rocky Flats Cleanup Agreement State Colorado Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. Parties DOE; US EPA; The State of Colorado Date 7/19/1996 SCOPE * Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. * Ensure that the environmental impacts associated with activities at the Site will continue to be investigated and that appropriate response actions are taken. * Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the site. * Coordinate all of DOE's cleanup obligations under CERCLA, RCRA, and the Colorado

133

Los Alamos National Laboratory Consent Agreement, December 10, 1993 Summary  

Broader source: Energy.gov (indexed) [DOE]

Consent Agreement Consent Agreement State New Mexico Agreement Type Consent Agreement Legal Driver(s) New Mexico Hazardous Waste Act/ RCRA Scope Summary Resolve Compliance Orders issued against DOE regarding the placement of transuranic waste on existing pads. The agreement will result in DOE subsequently placing transuranic waste on pads that are compliant with RCRA and the NM Hazardous Waste Act. Parties DOE; University of California; New Mexico Environment Department Date 12/10/1993 SCOPE * Establish a remediation plan and compliance schedule for placing transuranic mixed waste in storage areas that comply with the New Mexico Hazardous Waste Act (NMHWA). * Resolve issues raised by New Mexico Compliance Orders 93-01, 93-02, 93-03, and 93-04 issued against DOE and the University of California regarding violations of the

134

Federal Facility Agreement for the Paducah Gaseous Diffusion Plant Summary  

Broader source: Energy.gov (indexed) [DOE]

Federal Facility Agreement for the Paducah Gaseous Federal Facility Agreement for the Paducah Gaseous Diffusion Plant State Kentucky Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Ensure that the environmental impacts of activities at the Site are investigated and appropriate response actions are taken. Parties U.S. DOE; Kentucky Natural Resources and Environmental Protection Cabinet; U.S. EPA Date 2/01/1998 SCOPE * Ensure all releases of hazardous substances, pollutants, or contaminants are addressed to achieve comprehensive remediation of the site. * Establish a procedural framework and schedule for developing, implementing, and monitoring response actions in accordance with CERCLA, RCRA, and Kentucky Law. * Facilitate cooperation, exchange of information, and participation of the Parties and

135

Natural Resources Defense Council Consent Decree, May 26, 1988 Summary  

Broader source: Energy.gov (indexed) [DOE]

Decree No. 1:85-2583-6 Decree No. 1:85-2583-6 State South Carolina Agreement Type Consent Decree Legal Driver(s) RCRA Scope Summary Establish guidelines for the closure of certain facilities at the Savannah River Plant. Parties DOE (SRP); State of South Carolina (Department of Health and Environmental Control); US DOJ; Natural Resources Defense Council; Energy Research Foundation; Assistant U.S. Attorney of the District of South Carolina; South Carolina League of Women Voters Date 5/26/1988 SCOPE * Establish guidelines for the closure of certain facilities at the Savannah River Plant: Metallurgical Laboratory Basin, Acid/Caustic Basins, Mixed Waste Management Facility, Seepage Basins, New TXN Basin, Leaking M-Area Storage Tanks. ESTABLISHING MILESTONES * Applicable schedules and deadlines are established in this Consent Decree.

136

Fernald Triparty Agreement as revised, July 18, 1986 Summary  

Broader source: Energy.gov (indexed) [DOE]

Federal Facility Compliance Agreement Federal Facility Compliance Agreement State Ohio Agreement Type Compliance Agreement Legal Driver(s) RCRA/CERCLA/CWA Scope Summary Establish a Compliance Plan to ensure compliance by DOE with existing environmental statutes, and implementing regulations, including the Clean Air Act, RCRA, and CERCLA, at FMPC Parties DOE; US EPA Date 7/18/1986 SCOPE * Establish a Compliance Plan to ensure compliance by DOE with existing environmental statutes, and implementing regulations, including the Clean Air Act, RCRA, and CERCLA, at FMPC. * Ensure that the environmental impacts associated with past and present activities at the FMPC are thoroughly investigated, and appropriate remedial response action taken. * This Agreement does not address compliance, or the lack thereof, by DOE's FMPC

137

Savannah River Site Settlement Agreement, August 26, 1991 Summary  

Broader source: Energy.gov (indexed) [DOE]

91-51-SW 91-51-SW State South Carolina Agreement Type Settlement Agreement Legal Driver(s) RCRA Scope Summary Establish procedures and guidelines for F listed solvent contaminated rag disposal Parties DOE (SRS); State of South Carolina (Department of Health and Environmental Control) Date 8/26/1991 SCOPE * Establish a course of action for DOE's violation of the South Carolina Hazardous Waste Management Regulations at the SRS. * Establish procedures and guidelines for F listed solvent contaminated rag disposal. ESTABLISHING MILESTONES * By October 31, 1991, SRS shall amend the Part A Permit Application to include the solvent rags and wipes and those portions of the LLRWDF and sanitary landfill which have received these wastes. * By August 31, 1993, SRS shall submit to DHEC an amendment to the closure plans

138

Savannah River Site Federal Facility Agreement, January 15, 1993 Summary  

Broader source: Energy.gov (indexed) [DOE]

Site Site Agreement Name Savannah River Site Federal Facility Agreement Under Section 120 of CERCLA, January 15, 1993 State South Carolina Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Ensure that the environmental impacts associated with past and present activities at the Savannah River Site are thoroughly investigated and that appropriate response actions are taken to protect the public health, welfare, and the environment. Parties DOE; US EPA; South Carolina Department of Health and Environmental Control (SCDHEC) Date 1/15/1993 SCOPE * Ensure that the environmental impacts associated with past and present activities at the Savannah River Site are thoroughly investigated and that appropriate response actions are taken to protect the public health, welfare, and the environment.

139

Savannah River Site Settlement Agreement, November 10, 1987 Summary  

Broader source: Energy.gov (indexed) [DOE]

52-SW, as amended 5/9/1991 52-SW, as amended 5/9/1991 and 10/5/1995 State South Carolina Agreement Type Settlement Agreement Legal Driver(s) RCRA Scope Summary Establish a course of action due to DOE's violation of the Department's Hazardous Waste Management Regulations. Parties DOE (SRP); State of South Carolina (Department of Health and Environmental Control) Date 11/10/1987 SCOPE * Establish a course of action due to DOE's violation of the Department's Hazardous Waste Management Regulations. * Update appropriate milestone dates. ESTABLISHING MILESTONES * DOE shall attend quarterly meetings with the Department concerning updates on the hydrogeologic investigation of the BGC and the Part B Permit Application. * By November 15, 1995, DOE shall submit a Part B Permit Application for the MWMF

140

Idaho National Engineering Laboratory Consent Order, June 14, 2000 Summary  

Broader source: Energy.gov (indexed) [DOE]

Idaho National Engineering & Environmental Laboratory Idaho National Engineering & Environmental Laboratory Consent Order §39-4413 State Idaho Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Resolve situations which may involve violations of HWMA and the Idaho Rules and Standards for Hazardous Waste Parties DOE; Idaho Department of Health and Welfare Date 6/14/2000 SCOPE * Resolve situations which may involve violations of HWMA and the Idaho Rules and Standards for Hazardous Waste. * Incorporate and enforce the Action Plan which outlines compliance with regard to the Covered Matters. * This Consent Order covers three types of Covered Matters: 1) Covered Matters with Detailed Action Plans, 2) Covered Matters with Tiered Milestones, and 3) Covered Matters that are Closed. ESTABLISHING MILESTONES

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Mound Plant Federal Facility Agreement, July 15, 1993 Summary  

Broader source: Energy.gov (indexed) [DOE]

United States Environmental Protection Agency Region V United States Environmental Protection Agency Region V and the State of Ohio Federal Facility Agreement State Ohio Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary DOE shall identify Interim Remedial Actions (IRAs) alternatives and implement US EPA and OEPA approved remedies for the site in accordance with CERCLA Parties EPA; Ohio EPA (OEPA); DOE Date 07/15/1993 SCOPE * Identify Interim Remedial Action (IRA) alternatives which include Remedial Investigations (RI) and Feasibility Studies (FS); design and implement US EPA and OEPA approved remedies for the Mound site in accordance with CERCLA. ESTABLISHING MILESTONES * After approval of remedial design and action plans, DOE shall prepare and provide to U.S. EPA and OEPA written monthly progress reports.

142

Portsmouth Administrative Consent Order, August 12, 1997 Summary  

Broader source: Energy.gov (indexed) [DOE]

US EPA Administrative Consent Order US EPA Administrative Consent Order (No. OH7 890 008 983) State Ohio Agreement Type Consent Order Legal Driver(s) RCRA/CERCLA Scope Summary Establish a structure for oversight of DOE activities encouraging expeditious and efficient clean-up of Hazardous Waste/Constituents/Substances present at PORTS. Parties DOE; US EPA; State of Ohio Date 8/12/1997 SCOPE * Establish a structure for oversight of DOE activities encouraging expeditious and efficient clean-up of Hazardous Waste/Constituents/Substances present at PORTS. * Ensure compliance with RCRA and CERCLA. ESTABLISHING MILESTONES * By the fifteenth day of January, April, July, and October, DOE shall submit a report to US EPA describing response action activities during the preceding three months with

143

Savannah River Site Settlement Agreement, May 1, 1987 Summary  

Broader source: Energy.gov (indexed) [DOE]

27-SW 27-SW State South Carolina Agreement Type Settlement Agreement Legal Driver(s) RCRA Scope Summary Establish a course of action due to SRP's violation of the Department's Hazardous Waste Management Regulations including updated submission dates for Part B Permit Applications. Parties DOE (SRP); State of South Carolina (Department of Health and Environmental Control) Date 5/1/1987 SCOPE * Establish a course of action due to SRP's violation of the Department's Hazardous Waste Management Regulations. * Appropriately update submission dates for Part B Permit Applications. ESTABLISHING MILESTONES * By April 30, 1987, DOE shall submit to DHEC a revised Part B Permit Application for M Area Settling Basin, Overflow Ditch, Seep Area, and Lost Lake and the container

144

Public Service Company of Colorado v. Batt Agreement Summary  

Broader source: Energy.gov (indexed) [DOE]

Public Service Company of Colorado v. Batt Public Service Company of Colorado v. Batt State Idaho Agreement Type Settlement Agreement Legal Driver(s) Federal Court Order Scope Summary To control and set schedules for the shipments of spent nuclear fuel to Idaho, and of transuranic waste, high-level waste, and spent nuclear fuel leaving Idaho. Parties DOE; US Department of the Navy; State of Idaho Date 10/16/1995 SCOPE * Establish a timetable for shipments of transuranic (TRU) waste leaving and being sent to Idaho. * Establish a schedule for spent nuclear fuel (SNF) to be removed from Idaho and establishes a relationship between shipments of aluminum-clad SNF sent to and received from the Savannah River Site. * Determines a schedule for treatment of high-level waste (HLW). ESTABLISHING MILESTONES

145

EIS-0489-ScopingExtension-2012.pdf  

Broader source: Energy.gov (indexed) [DOE]

Federal Energy Regulatory Commission Federal Energy Regulatory Commission Jordan Cove Energy Project LP Docket No. PF12-7-000 Pacific Connector Gas Pipeline LP Docket No. PF12-17-000 NOTICE OF EXTENSION OF COMMENT PERIOD AND ADDITIONAL PUBLIC SCOPING MEETINGS FOR THE JORDAN COVE LIQUEFACTION AND PACIFIC CONNECTOR PIPELINE PROJECTS (August 28, 2012) This notice announces the extension of the public scoping process and comment period for Jordan Cove Energy Project LP's (Jordan Cove) proposed liquefaction project in Coos County, Oregon, in Docket No. PF12-7-000, and Pacific Connector Gas Pipeline LP's (Pacific Connector) proposed pipeline project crossing portions of Klamath, Jackson, Douglas, and Coos Counties, Oregon, in Docket No. PF12-17-000. In addition

146

Fire Protection Program: Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary Summary Since May 1950, an Annual Fire Protection Program Summary has been submitted by DOE's fire protection community. Currently, this report is required by section 5a.(8) of DOE Order 231.1. "Environment, Safety and Health Reporting." In 1999, an automation initiative was undertaken to streamline data collection and provide a more through review of DOE Reporting Element activities. This action resulted in the delayed publications of the CY 1999 and 2000 reports until 2002. It is now possible however to view all Annual Summary Reporting Element responses since 1991 at the Site, Operations, Lead Program Secretarial Office and Headquarters levels. Additionally, a build-in reference to other DOE reporting activities (CAIRS and ORPS) is available that allows Reporting Elements and managers the opportunity to review all fire protection events along previously mentioned categories. Reports listed below were generated from this application. To obtain a copy of the Annual Summary Application please contact Jim Bisker in the Office of Nuclear and Facility Safety Policy (EH-53) at (301)903-6542 or Jim Bisker.

147

FY 2014 Metric Summary | Department of Energy  

Office of Environmental Management (EM)

4 Metric Summary FY 2014 Metric Summary FY 2014 Q1 Metric Summary.pdf FY 2014 Q2 Metric Summary.pdf FY 2014 Q3 Metric Summary.pdf More Documents & Publications FY 2014 Q3 Metric...

148

UNITED NATIONS ENVIRONMENT PROGRAMME PROJECT DOCUMENT SUMMARY  

Open Energy Info (EERE)

UNITED NATIONS ENVIRONMENT PROGRAMME UNITED NATIONS ENVIRONMENT PROGRAMME PROJECT DOCUMENT SUMMARY 1.1 Title of Sub-Programme: Climate Change 1.2 Title of Project: Solar and Wind Energy Resource Assessment 1.3 Project number: GF/ 1.4 Geographical Scope: Global (10) 1.5 Implementation: Internal DTIE with 20 supporting agencies 1.6 Duration of the Project: 36 months Commencing: June 2001 Completion: July 2004 1.7 Cost of Project: (Expressed in thousands of US dollars, excluding PDF grant) 2001 2002 2003 2004 Total % GEF Trust Fund 1,430 1,742 1,613 1,013 6,512 73 Collaborating Agencies (in kind) 418 836 836 418 2,508 28 3,849 4,580 4,452 3,435 9,020 100 1.8 Project Summary This project will provide solar and wind resource data and geographic information assessment tools to public and private sector executives who are involved in energy market development. It

149

Summary-Final.PDF  

Broader source: Energy.gov (indexed) [DOE]

SUMMARY SUMMARY June 2000 1 SUMMARY This document constitutes the first edition of a long-term research and development (R&D) plan for nuclear technology in the United States. Introduction In 1998, DOE established the Nuclear Energy Research Advisory Committee (NERAC) to provide advice to the Secretary and to the Director, Office of Nuclear Energy, Science, and Technology (NE), on the broad range of non-defense DOE nuclear technology programs. The NERAC recommended development of a long-range R&D program. This R&D plan is a result of that recommendation and is the first of what is expected to be an iterated series of long-range plans for nuclear energy in the Department of Energy. To develop this plan, 145 nuclear and non-nuclear scientists, engineers, and academics

150

ESPC ENABLE: ECM Summary  

Broader source: Energy.gov (indexed) [DOE]

ESPC ENABLE: ECM Summary ESPC ENABLE: ECM Summary ECM Included Not Included Lighting * Lamps, Ballasts, Fixtures * Controls: Occupancy, Day lighting (on/off, dimming) * Solar Lighting (off-grid installations allowed) Water * Sanitary plumbing fixtures: sinks, toilets, urinals, showers * Irrigation * Leak repair * Domestic/commercial hot water heaters * Water based appliances: dishwasher, ice machine, clothes washer, etc. * Heating/Cooling system improvements (cooling towers, once through cooling, condensate reclaim) HVAC Controls Whole building control strategies including: * Time/Temperature Set-back * Demand/Night Ventilation * Advanced Controls 1 : Energy Management Control Systems (EMCS) / Building Automation Systems (BAS) HVAC Equipment Basic whole building/system one-for-one replacement

151

ESPC ENABLE: ECM Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ESPC ENABLE: ECM Summary ESPC ENABLE: ECM Summary ECM Included Not Included Lighting * Lamps, Ballasts, Fixtures * Controls: Occupancy, Day lighting (on/off, dimming) * Solar Lighting (off-grid installations allowed) Water * Sanitary plumbing fixtures: sinks, toilets, urinals, showers * Irrigation * Leak repair * Domestic/commercial hot water heaters * Water based appliances: dishwasher, ice machine, clothes washer, etc. * Heating/Cooling system improvements (cooling towers, once through cooling, condensate reclaim) HVAC Controls Whole building control strategies including: * Time/Temperature Set-back * Demand/Night Ventilation * Advanced Controls 1 : Energy Management Control Systems (EMCS) / Building Automation Systems (BAS) HVAC Equipment Basic whole building/system one-for-one replacement

152

Lawrence Livermore National Laboratory Federal Facility Agreement, June 29, 1992 Summary  

Broader source: Energy.gov (indexed) [DOE]

Site 300) Site 300) Agreement Name Lawrence Livermore National Laboratory Federal Facility Agreement Under CERCLA Section 120, June 29, 1992 State California Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the Site Parties DOE; USEPA; California Department of Toxic Substances Control; Central Valley Regional Water Quality Control Board Date 6/29/1992 SCOPE * Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the Site. * Identify operable units (OUs) which are appropriate at the Site prior to the implementation of final remedial action(s).

153

Lawrence Livermore National Laboratory Main Site FFA Under CERCLA Section 120, November 1, 1988 Summary  

Broader source: Energy.gov (indexed) [DOE]

Lawrence Livermore National Laboratory (Main Site) Lawrence Livermore National Laboratory (Main Site) Federal Facility Agreement Under CERCLA Section 120, November 1, 1988 State California Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the Site Parties DOE; USEPA; California Department of Health Services; California Regional Water Quality Control Board Date 11/1/1988 SCOPE * Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the Site. * Establish a basis for a determination that the DOE has completed remedial action and corrective measures to satisfaction. ESTABLISHING MILESTONES

154

U-265: HP SiteScope Bugs in SiteScope SOAP Feature Let Remote Users Obtain  

Broader source: Energy.gov (indexed) [DOE]

5: HP SiteScope Bugs in SiteScope SOAP Feature Let Remote Users 5: HP SiteScope Bugs in SiteScope SOAP Feature Let Remote Users Obtain Information and Execute Arbitrary Code U-265: HP SiteScope Bugs in SiteScope SOAP Feature Let Remote Users Obtain Information and Execute Arbitrary Code September 21, 2012 - 6:00am Addthis PROBLEM: HP SiteScope Bugs in SiteScope SOAP Feature Let Remote Users Obtain Information and Execute Arbitrary Code PLATFORM: HP SiteScope v11.10, v11.11, v11.12 for Windows, Linux and Solaris ABSTRACT: A vulnerability was reported in HP SiteScope. reference LINKS: HP Security Bulletin Document ID: c03489683 SecurityTracker Alert ID: 1027547 CVE-2012-3259 CVE-2012-3260 CVE-2012-3261 CVE-2012-3262 CVE-2012-3263 CVE-2012-3264 IMPACT ASSESSMENT: Medium Discussion: A vulnerability was reported in HP SiteScope. A remote user can execute

155

U-265: HP SiteScope Bugs in SiteScope SOAP Feature Let Remote Users Obtain  

Broader source: Energy.gov (indexed) [DOE]

5: HP SiteScope Bugs in SiteScope SOAP Feature Let Remote Users 5: HP SiteScope Bugs in SiteScope SOAP Feature Let Remote Users Obtain Information and Execute Arbitrary Code U-265: HP SiteScope Bugs in SiteScope SOAP Feature Let Remote Users Obtain Information and Execute Arbitrary Code September 21, 2012 - 6:00am Addthis PROBLEM: HP SiteScope Bugs in SiteScope SOAP Feature Let Remote Users Obtain Information and Execute Arbitrary Code PLATFORM: HP SiteScope v11.10, v11.11, v11.12 for Windows, Linux and Solaris ABSTRACT: A vulnerability was reported in HP SiteScope. reference LINKS: HP Security Bulletin Document ID: c03489683 SecurityTracker Alert ID: 1027547 CVE-2012-3259 CVE-2012-3260 CVE-2012-3261 CVE-2012-3262 CVE-2012-3263 CVE-2012-3264 IMPACT ASSESSMENT: Medium Discussion: A vulnerability was reported in HP SiteScope. A remote user can execute

156

RICAP-07: Summary comments  

E-Print Network [OSTI]

The Roma International Conference on Astroparticle Physics covered gamma-ray astronomy, air shower experiments and neutrino astronomy on three successive days. I organize my brief summary comments into four topics that cut across these three techniques. They are detector calibration, galactic sources, extra-galactic sources and cosmology.

Thomas K. Gaisser

2008-01-29T23:59:59.000Z

157

Sustainability Initiative Executive Summary  

E-Print Network [OSTI]

UW­Madison Sustainability Initiative Executive Summary October 2010 #12;2 We are pleased to present the final report of the campus Sustainability Task Force. This report fulfills the charge we gave to sustainability for consideration by UW­Madison's leadership and campus community. There are many reasons why

Sheridan, Jennifer

158

Summary.qxd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

S-2 Summary B i r c h C r e ek East Butte Middle Butte Big Southern Butte LAVA Black Canyon Wilderness Study Area Hell's Half Acre Wilderness Study Area C H A L L I S N A T I...

159

REBUILD AMERICA PROGRAM SCOPE OF WORK  

SciTech Connect (OSTI)

This report summarizes the activities carried out by Aspen Systems Corporation in support of the Department of Energy's Rebuild America program during the period from October 9, 1999 to October 31, 2004. These activities were in accordance with the Scope of Work contained in a GSA MOBIS schedule task order issued by the National Energy Technology Laboratory. This report includes descriptions of activities and results in the following areas: deployment/delivery model; program and project results; program representative support activities; technical assistance; web site development and operation; business/strategic partners; and training/workshop activities. The report includes conclusions and recommendations. Five source documents are also provided as appendices.

Jeffrey Brown; Bruce Exstrum

2004-12-01T23:59:59.000Z

160

Decision Summaries | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Decision Summaries Decision Summaries Decision Summaries RSS January 16, 2014 Summary of Decisions - December 30, 2013 - January 3, 2014 Decisions were issued on: - Privacy Act Appeal January 10, 2014 Summary of Decisions - MM DD YYYY - MM DD YYYY Decisions were issued on: - Personnel Security (10 CFR Part 710) December 27, 2013 Summary of Decisions - December 23, 2013 - December 27, 2013 Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710) December 20, 2013 Summary of Decisions - December 16, 2013 - December 20, 2013 Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710) December 13, 2013 Summary of Decisions - December 9, 2013 - December 13, 2013 Decisions were issued on: - Freedom of Information Act Appeal

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Microsoft Word - Summary.doc  

Broader source: Energy.gov (indexed) [DOE]

Summary Summary v TABLE OF CONTENTS Table of Contents .......................................................................................................................................................... v List of Figures .............................................................................................................................................................. vi List of Tables ................................................................................................................................................................ vi Acronyms, Abbreviations, and Conversion Charts ..................................................................................................... vii S.1 Introduction and Purpose and Need ...........................................................................................................S-1

162

Final Meeting Summary Page 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that all summaries are posted to the HAB website once finalized and HAB members can review draft summaries on the SharePoint site. Announcements Liz said a public meeting was...

163

EIS-0463: Reopening of Scoping Period for the Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Reopening of Scoping Period for the Environmental Impact Reopening of Scoping Period for the Environmental Impact Statement EIS-0463: Reopening of Scoping Period for the Environmental Impact Statement Northern Pass Transmission Line Project The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). The scoping period now ends on June 14, 2011. Reopening of Scoping Period for the Northern Pass Transmission Line Project Environmental Impact Statement, EIS-0463 (April 2011) (76 FR 21338) More Documents & Publications EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0425: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0448: Notice of Adoption of an Environmental Impact Statement

164

Memorandum for General Counsels, NEPA Liaisons and Participants in Scoping  

Broader source: Energy.gov (indexed) [DOE]

Memorandum for General Counsels, NEPA Liaisons and Participants in Memorandum for General Counsels, NEPA Liaisons and Participants in Scoping Memorandum for General Counsels, NEPA Liaisons and Participants in Scoping As part of its continuing oversight of the implementation of the NEPA regulations, the Council on Environmental Quality has been investigating agency experience with scoping. This is the process by which the scope of the issues and alternatives to be examined in an EIS is determined. In a project led by Barbara Bramble of the General Counsel's staff the Council asked federal agencies to report their scoping experiences; Council staff held meetings and workshops in all regions of the country to discuss scoping practice; and a contract study was performed for the Council to investigate what techniques work best for various kinds of proposals.

165

EIS-0463: Reopening of Scoping Period for the Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

463: Reopening of Scoping Period for the Environmental Impact 463: Reopening of Scoping Period for the Environmental Impact Statement EIS-0463: Reopening of Scoping Period for the Environmental Impact Statement Northern Pass Transmission Line Project The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). The scoping period now ends on June 14, 2011. Reopening of Scoping Period for the Northern Pass Transmission Line Project Environmental Impact Statement, EIS-0463 (April 2011) (76 FR 21338) More Documents & Publications EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0469: Notice of Intent To Prepare an Environmental Impact Statement and

166

California's Climate Change Proposed Scoping Plan | Open Energy Information  

Open Energy Info (EERE)

Climate Change Proposed Scoping Plan Climate Change Proposed Scoping Plan Jump to: navigation, search Name California's Climate Change Proposed Scoping Plan Agency/Company /Organization State of California Resource Type Publications, Lessons learned/best practices Website http://www.arb.ca.gov/cc/scopi Country United States Northern America References California's Climate Change Scoping Plan[1] Background "The Assembly Bill 32 Scoping Plan contains the main strategies California will use to reduce the greenhouse gases (GHG) that cause climate change. The scoping plan has a range of GHG reduction actions which include direct regulations, alternative compliance mechanisms, monetary and non-monetary incentives, voluntary actions, market-based mechanisms such as a cap-and-trade system, and an AB 32 program implementation regulation to

167

Business Model Guide Executive Summary  

Broader source: Energy.gov [DOE]

The Business Model Guide Executive Summary by the U.S. Department of Energy's Better Buildings Neighborhood Program.

168

Pseudo-Single-Bunch Expands Experimental Scope  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pseudo-Single-Bunch Expands Experimental Scope Print Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch can stop the light emitted from the other bunches using a collimator. Other beamlines would only see a small reduction in flux due to the displaced bunch. As a result, PSB complements the scheduling of multibunch and timing experiments-currently, the ALS only offers these capabilities for four weeks out of its yearly operating schedule. With PSB operation, the ability to conduct time-of-flight experiments could be available year-round.

169

Pseudo-Single-Bunch Expands Experimental Scope  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pseudo-Single-Bunch Expands Experimental Scope Print Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch can stop the light emitted from the other bunches using a collimator. Other beamlines would only see a small reduction in flux due to the displaced bunch. As a result, PSB complements the scheduling of multibunch and timing experiments-currently, the ALS only offers these capabilities for four weeks out of its yearly operating schedule. With PSB operation, the ability to conduct time-of-flight experiments could be available year-round.

170

Pseudo-Single-Bunch Expands Experimental Scope  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pseudo-Single-Bunch Expands Experimental Scope Print Pseudo-Single-Bunch Expands Experimental Scope Print Initial tests of a new pseudo-single-bunch (PSB) operational mode at the ALS have shown promising results-PSB would vastly expand the facility's capacity to carry out dynamics and time-of-flight experiments with a major reduction in sample damage. In PSB operation, a single electron bunch is displaced transversely from the other electron bunches circulating in the storage ring. Experiments that require light emitted only from a single bunch can stop the light emitted from the other bunches using a collimator. Other beamlines would only see a small reduction in flux due to the displaced bunch. As a result, PSB complements the scheduling of multibunch and timing experiments-currently, the ALS only offers these capabilities for four weeks out of its yearly operating schedule. With PSB operation, the ability to conduct time-of-flight experiments could be available year-round.

171

Partnership Overview and Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Phase III Field Test Phase III Field Test Overview and Summary RCSP Initiative Annual Review Meeting Pittsburgh, PA October 6 - 8, 2008 Presented by Brian J. McPherson Southwest Regional Partnership on Carbon Sequestration New Mexico Tech 2 Southwest Regional Partnership on Carbon Sequestration Acknowledgements * Many thanks to the U.S. Department of Energy and NETL for supporting this project * We express our gratitude also to our many industry partners, who have committed a great deal of time, funding and other general support for these projects * The work presented today is co-authored by all partners in the Southwest Partnership 3 Southwest Regional Partnership on Carbon Sequestration * Phase II - Phase III Integration * Summary of Phase III Project * location * site characterization

172

COR Summary of Experience  

Broader source: Energy.gov (indexed) [DOE]

COR SUMMARY OF EXPERIENCE COR SUMMARY OF EXPERIENCE Effective January 1, 2012 CORs who are applying for certification must demonstrate past contracting, acquisition, procurement, program/project management, and general business experience. This experience is based on a set of competencies. Some of the competencies are listed below to use as a reference when you are documenting your previous experience. Use this template to document your experience. Experience should be supported by a written confirmation from the cognizant Contracting Officer/Contract Specialist showing the contract number, title and date(s) to which the experience applied. Once you have completed this document, please forward it and its supporting statement(s) to your Site Acquisition Career Manager (SACM) as part of your application for COR certification.

173

Wildlife Trade: Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Summary Project Summary Scenario Student Pages Internet Links Index Subject/Content Area: Physical Science, Social Studies, Mathematics, and Learning Strategies Target Audience: Thornridge is a comprehensive high school serving approximately 2,000 ninth through twelfth grade students living southeast of the Chicago city limits. Student backgrounds vary greatly socio-economically (below the poverty line to approximately six figures), ethnically (7% Caucasian, 87% African-American, 6% Hispanic) and culturally. Mobility and unemployment are high. Steel mills, the auto industry, steel processing plants and the construction trades have been the major employers; however, many no longer exist. Student test scores in all areas are below the state mean. Eighty freshmen, identified as performing

174

DESIGN GUIDELINE SUMMARY  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 Rev. 3 3 Rev. 3 August 2003 Rev. June 2004 Design Guideline Summary Based on the GEOVISION Report of Stanford Linear Accelerator Tunnel Vibration Measurements Parsons Pasadena, CA For Stanford Linear Accelerator Center Stanford University Stanford, CA Abstract: This summary report is provided in order to suggest how the measurement data from the GEOVision report might be used by SLAC for their proposed Next Linear Collider facility. See the referenced report "Stanford Linear Accelerator Tunnel Vibration Measurements, Conducted at MTA Universal Subway Station, North Hollywood, California", by GEOVision dated July 28, 2003. The following discussions are an attempt to determine an upper bound methodology that can be used for design purposes. The data in the

175

Preliminary Summary of Findings  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Diversity Focus Groups Diversity Focus Groups Summary Report Prepared by Doug Sarno, The Perspectives Group This report provides a summary of 23 focus groups conducted between November 2008 and January 2009 with Fermilab employees and users. Purpose of the Focus Groups The purpose of the focus groups was to further explore the issues raised by the report of the Committee on the Status of Women in Physics (CSWP) and the Committee on Minorities (COM) of the American Physical Society (APS) on their visit to Fermilab on May 20-21, 2008. That visit included conversations with 47 self-selected participants and raised a number of important issues regarding diversity and workplace issues at Fermilab. The report can be found at http://www.fnal.gov/pub/diversity/files/APS_Report.pdf

176

5.0 SUMMARY  

Broader source: Energy.gov (indexed) [DOE]

0 SUMMARY 0 SUMMARY This environmental assessment provides an analysis of several approaches to the handling of hazardous and mixed wastes at DOE's Mound Plant in Miamisburg, Ohio. The first approach considered, the proposed action, involves the operation of an existing glass metter (also known as a Penberthy Pyro·Converter joule·heated glass furnace) for the treatment of hazardous and mixed wastes. The analysis also considers the no-action alternative, involving the continuance of existing practices at Mound for the handling of hazardous and mixed wastes, as well as various on-site and off-site treatment, storage, or disposal alternatives, Under the proposed action, the primary potential sources of environmental impact are air emissions and effluent discharges, Potential changes in air and water quality may

177

MPhil initiatives summary  

E-Print Network [OSTI]

) Sustainable development for large infrastructure projects (50% input from CU, 50% from MIT) Planning for sustainable development (MIT course tailored for CU) Sustainable energy (MIT course tailored for CU) Design for developing countries (MIT course tailored... CMI Summary of MPhil Initiatives M.Phil in BioScience Enterprise (launched October 2002). Aimed at bio-entrepreneurs, this programme offers teaching on the latest advances in biomedical science, business management, and ethical, legal...

2009-07-13T23:59:59.000Z

178

GLOVEBOX GLOVE CHARACTERIZATION SUMMARY  

SciTech Connect (OSTI)

A task was undertaken to determine primarily the permeation behavior of various glove compounds from four manufacturers. As part of the basic characterization task, the opportunity to obtain additional mechanical and thermal properties presented itself. Consequently, a total of fifteen gloves were characterized for permeation, Thermogravimetric Analysis, Puncture Resistance, Tensile Properties and Dynamic Mechanical Analysis. Detailed reports were written for each characterization technique used. This report contains the summary of the results.

Korinko, P.

2012-05-14T23:59:59.000Z

179

EIS-0489: Notice of Comment Period Extension and Additional Scoping...  

Broader source: Energy.gov (indexed) [DOE]

Meetings EIS-0489: Notice of Comment Period Extension and Additional Scoping Meetings Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project...

180

Microsoft Word - Post-2011 Review DRAFT Scoping Document_09162013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

September 16, 2013 1 Energy Efficiency Post-2011 Review Scoping Document I. Overview and Timeline The "Energy Efficiency Post-2011 Review" (Review) is a public process to review...

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

DOE Issues Request for Information for Scope Requirements Planning...  

Energy Savers [EERE]

with successfully completing this type of work scope, which includes items such engineering services and environmental consulting services. The type of contract, period...

182

EIS-0432: Scoping Meeting Transcript, 12/16/2009 | Department...  

Broader source: Energy.gov (indexed) [DOE]

12162009 EIS-0432: Scoping Meeting Transcript, 12162009 More Documents & Publications Yucca Mountain - U.S. Department of Energy's Response to the Motion for Recusal...

183

Appendix A Summary  

Gasoline and Diesel Fuel Update (EIA)

The The 1996 data for the Natural Gas Annual are taken primarily from Form EIA-176, "Annual Report of Natural and Supple- mental Gas Supply and Disposition" and Form EIA-895, "Monthly Quantity and Value of Natural Gas Report ." Each of these surveys and all other sources of data for this report are discussed separately in the following sections. Form EIA-176 Survey Design The original version of Form EIA-176 was approved in 1980 with a mandatory response requirement. Prior to 1980, pub- lished data were based on voluntary responses to Bureau of Mines, U.S. Department of the Interior predecessor Forms BOM-6-1340-A and BOM-6-1341-A of the same title. In 1982, the scope of the revised EIA-176 survey was ex- panded to collect the number of electric utility consumers in each State, volumes of gas transported to industrial and electric utility consumers, detailed information

184

Team Summary | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Team Summary Team Summary Team Summary Team Summary Purpose: Identify, prioritize, and resolve issues for effective site revitalization. Address crosscutting issues. Incorporate ARI's mission into programmatic business practices. Team Attributes and Functions: Coordinate using existing site and program protocols (ARI Task Force is not responsible for site-specific ARI projects or programs). Resolve issues through: Lessons learned Information resources Policy statements Process improvement techniques Proposed legislative changes Partnering with other agencies Facilitation Define, prioritize, and establish deliverable timelines and manage resources. Incorporate co-leadership and cross-functional membership. Team Summaries: Steering Committee Objective: Set the strategic direction, provide overarching leadership,

185

Research in the chemical sciences. Summaries of FY 1995  

SciTech Connect (OSTI)

This summary book is published annually to provide information on research supported by the Department of Energy`s Division of Chemical Sciences, which is one of four Divisions of the Office of Basic Energy Sciences in the Office of Energy Research. These summaries provide the scientific and technical public, as well as the legislative and executive branches of the Government, information, either generally or in some depth, about the Chemical Sciences program. Scientists interested in proposing research for support will find the publication useful for gauging the scope of the present basic research program and it`s relationship to their interests. Proposals that expand this scope may also be considered or directed to more appropriate offices. The primary goal of the research summarized here is to add significantly to the knowledge base in which existing and future efficient and safe energy technologies can evolve. As a result, scientific excellence is a major criterion applied in the selection of research supported by the Division of Chemical Sciences, but another important consideration is emphasis on science that is advancing in ways that will produce new information related to energy.

NONE

1995-09-01T23:59:59.000Z

186

TEC Working Group Topic Groups Security Meeting Summaries | Department...  

Office of Environmental Management (EM)

Summaries TEC Working Group Topic Groups Security Meeting Summaries Meeting Summaries Green Bay STG Meeting Summary- September 14, 2006 Washington STG Meeting Summary - March 14,...

187

FINAL DOE/OR/21950-1016 RESPONSIVENESS SUMMARY= PRAXAIR INTERIM ACTIONS ENGINEERING  

Office of Legacy Management (LM)

p//l/ * :P/ p//l/ * :P/ 142366 _ FINAL DOE/OR/21950-1016 RESPONSIVENESS SUMMARY= PRAXAIR INTERIM ACTIONS ENGINEERING EVALUATION/COST ANALYSIS (EEKA) TONAWANDA, NEW YORK MAY 1996 prepared by U.S. Department of Energy, Oak Ridge Operations Off ice, Formerly Utilized Sites Remedial Action Program with technical assistance from Science Applications International Corporation ESC-FUSRAP under Contract No. DE-AC05-91OR21950 TABLE OF CONTENTS LISTOFTABLES ........................................... iii ACRONYMS AND ABBREVIATIONS ............................... v 1. INTRODUCTION ......................................... 1 2. SCOPE AND ORGANIZATION OF THE RESPONSIVENESS SUMMARY ..... 1 3. COMMENTSANDRESPONSES ....................... .: ... . .... 1 3.1 THE PREFERRED REMEDY .............................

188

International Hydrogen Infrastructure Challenges Workshop Summary...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE International Hydrogen Infrastructure Challenges Workshop Summary - NOW, NEDO, and DOE...

189

2012 IECC Commercial Scope and Envelope Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BUILDING ENERGY CODES UNIVERSITY www.energycodes.gov/becu BUILDING ENERGY CODES UNIVERSITY www.energycodes.gov/becu 1 BUILDING ENERGY CODES UNIVERSITY PNNL-SA-82105 2012 IECC Commercial Scope and Envelope Requirements July 2011 BUILDING ENERGY CODES UNIVERSITY www.energycodes.gov/becu 2 Does My Project Need to Comply with the Commercial Provisions in the IECC? All Buildings Other Than:  One- and two-family residential  R-2, R-3, R-4 three stories or less in height BUILDING ENERGY CODES UNIVERSITY www.energycodes.gov/becu 3 Change in Occupancy C101.4.4  Spaces undergoing a change in occupancy that would result in an increase in demand for either fossil fuel or electrical energy shall comply with this code.  Where the use in a space changes from one to another, the installed lighting wattage shall comply

190

Microsoft Word - CHPE Scoping Meetings Press Release  

Broader source: Energy.gov (indexed) [DOE]

FOR IMMEDIATE RELEASE FOR IMMEDIATE RELEASE Wednesday, June 30, 2010 DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project Washington, D.C. --The Department of Energy (DOE) is hosting seven meetings for public participation as part of its Environmental Impact Statement (EIS) preparation process pursuant to the National Environmental Policy Act (NEPA) to assess the potential environmental impacts from its proposed action of granting a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new electric transmission line across the U.S.- Canada border in northeastern New York. The meetings will enable the public to provide comments for consideration in establishing the

191

FY 2009 Summary Report  

Broader source: Energy.gov (indexed) [DOE]

of Performance and financial information FY 2009 DOE/CF-0045 The Reports Consolidation Act of 2000 authorizes Federal agencies, with the Office of Management and Budget's (OMB) concurrence, to consolidate various reports in order to provide performance, financial and related information in a more meaningful and useful format. In accordance with the Act, the Department of Energy (Department or DOE), has produced a consolidated Performance and Accountability Report (PAR) in previous years. For fiscal year (FY) 2009, the Department has chosen to produce an alternative report to the consolidated PAR and will produce an Agency Financial Report, an Annual Performance Report and a Summary of Performance and Financial

192

P9 Summary Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Learned Learned WTP Prototypic Mixing and Sampling System Vijay Jain Manager, Research & Technology (Vitrification) May 18-21, 2009 Waste Treatment & Immobilization Plant Project Presented at EM-21 Technical Exchange Denver, CO Jain 04102009 2 Outline Background Test requirements and system design Test status Technical issues during testing Test results Summary Jain 04102009 3 Highlights Testing system is prototypic Major technical and design issues resolved LAW report (3 simulants) - issued HLW & LAW tests - complete Data analyses - 08/09 Reports - 12/09 Jain 04102009 4 Background Compliance to waste specifications is critical to the success of WTP vitrification operations: - Mixing and sampling of waste and melter feed is an integral part

193

Summary Site Environmental Report  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Environmental Report Site Environmental Report for Calendar Year 2011 ANL-12/02 (Summary) Environment, Safety, and Quality Assurance Division Argonne National Laboratory Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor UChicago Argonne, LLC, nor any of their employees or officers, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product,

194

LEAP 1992: Conference summary  

SciTech Connect (OSTI)

We present a summary of the many new results in antiproton ({bar p}) physics presented at the LEAP `92 conference, in the areas of meson spectroscopy, {bar N}N scattering, annihilation and spin observables, strangeness and charm production, {bar N} annihilation in nuclei, atomic physics with very low energy {bar p}`s, the exploration of fundamental symmetries and interactions with {bar p} (CP, T, CPT, gravitation), and the prospects for new {bar p} facilities at ultralow energies or energies above the LEAR regime ({ge} 2 GeV/c).

Dover, C.B.

1992-12-01T23:59:59.000Z

195

LEAP 1992: Conference summary  

SciTech Connect (OSTI)

We present a summary of the many new results in antiproton ([bar p]) physics presented at the LEAP '92 conference, in the areas of meson spectroscopy, [bar N]N scattering, annihilation and spin observables, strangeness and charm production, [bar N] annihilation in nuclei, atomic physics with very low energy [bar p]'s, the exploration of fundamental symmetries and interactions with [bar p] (CP, T, CPT, gravitation), and the prospects for new [bar p] facilities at ultralow energies or energies above the LEAR regime ([ge] 2 GeV/c).

Dover, C.B.

1992-12-01T23:59:59.000Z

196

FY 1996 activity summary  

SciTech Connect (OSTI)

The US Department of Energy Office of Nuclear and Facility Safety provides nuclear safety policy, independent technical evaluation, and technical support. A summary of these activities is provided in this report. These include: (1) changing the mission of the former production facilities to storage and waste management; (2) stabilizing nuclear materials not recycled due to production cessation or interruptions; (3) reformulating the authorization basis for existing facilities to convert to a standards based approach for operations consistent with modern expectations; and (4) implementing a modern regulatory framework for nuclear facilities. Enforcement of the Price-Anderson Amendments Act is also reported.

NONE

1997-04-01T23:59:59.000Z

197

Scoping Constructs for Software Generators Yannis Smaragdakis and Don Batory  

E-Print Network [OSTI]

Scoping Constructs for Software Generators Yannis Smaragdakis and Don Batory Department of Computer-known problem in program generation is scoping. When iden- tifiers (i.e., symbolic names) are used to refer to variables, types, or functions, program generators must ensure that generated identifiers are bound

Smaragdakis, Yannis

198

Department of Energy Environmental Impact Statement Public Scoping Meeting  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Environmental Impact Statement Public Scoping Department of Energy Environmental Impact Statement Public Scoping Meeting on Northern Pass Transmission Line Project Department of Energy Environmental Impact Statement Public Scoping Meeting on Northern Pass Transmission Line Project Washington, D.C. - The Department of Energy (DOE) will host seven public scoping meetings as part of its Environmental Impact Statement (EIS) preparation process pursuant to the National Environmental Policy Act (NEPA) to assess the potential nvironmental impacts from its proposed action of granting a Presidential permit to Northern Pass Transmission to construct, operate, maintain, and connect a new electric transmission line across the U.S.-Canada border in northern New Hampshire. Department of Energy Environmental Impact Statement Public Scoping Meeting

199

LAI References and Summaries  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cart Sign In/Register Quick Data Search Help icon Go NASA Meatball Cart Sign In/Register Quick Data Search Help icon Go NASA Meatball No JAVASCRIPT Capabilities. This site will not function without JavaScript. Please use the Web Product Tree. or anonymous FTP at ftp://daac.ornl.gov/data. Global Leaf Area Index Data from Field Measurements, 1932-2000 References and summaries for literature on leaf area index (reviews, methodology, etc.) Barclay, H. J. (1998) Conversion of total leaf area to projcted leaf area in lodgepole pine and Douglas-fir. Tree PHysiology 18, 185-193. Summary It is noted that three distinct definitions of leaf area index (LAI) in the literature have no predictable relationship with each other. Conversion factors were derived, from total LAI to projected LAI of horizontal leaves and to projected LAI for inclined leaves of lodgepole pine and coastal Douglas-fir, enabling comparison of results from different studies. An algorithm was derived to allow determination of these factors based on twig angles and the angles that the foliage subtends with the twig. The conversion factor was more sensitive to differences in vertical angles of the twigs than to twig rotation or foliar arrangement on the twig.

200

Summaries of FY 91 geosciences research  

SciTech Connect (OSTI)

The Department of Energy supports research in the geosciences in order to provide a sound foundation of fundamental knowledge in those areas of the geosciences which are germane to the Department of Energy's many missions. The Division of Engineering and Geosciences, part of the Office of Basic Energy Sciences of the Office of Energy Research supports the Geosciences Research Program. The participants in this program include Department of Energy laboratories, academic institutions, and other governmental agencies. Theses activities are formalized by a contract or grant between the Department of Energy and the organization performing the work, providing funds for salaries, equipment, research materials, and overhead. The summaries in this document, prepared by the investigators, describe the scope of the individual programs. The Geosciences Research Program includes research in geology, petrology, geophysics, geochemistry, solar physics, solar-terrestrial relationships, aeronomy, seismology, and natural resource modeling and analysis, including their various subdivisions and interdisciplinary areas. All such research is related either directly or indirectly to the Department of Energy's long-range technological needs. 2 tabs.

Not Available

1991-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Decision Summaries | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 13, 2013 Summary of Decisions - December 9, 2013 - December 13, 2013 Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)...

202

Decision Summaries | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Act Appeal - Personnel Security (10 CFR Part 710) December 7, 2012 Summary of Decisions - December 3, 2012 - December 7, 2012 Decisions were issued on: - Personnel Security (10 CFR...

203

DOE-ID Operations Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of...

204

Yesterday's Daily Summary - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Historical Weather Charts Contacts...

205

Current Month Summary - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Station Real Time Met Data from Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Historical Weather Charts Contacts...

206

Air Quality Scoping Study for Sarcobatus Flat, Nevada (EMSI April 2007)  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energys Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at seven sites outside the NTS, including Ash Meadows National Wildlife Refuge, Sarcobatus Flat, Beatty, Rachel, Caliente, Pahranagat National Wildlife Refuge, and Crater Flat, and at four sites on the NTS. The trailer is stationed at any one site for approximately eight weeks at a time. Letter reports provide summaries of air quality and meteorological data, on completion of each sites sampling program.

Johann Engelbrecht, Ilias Kavouras, Dave Campbell, Scott Campbell, Steven Kohl and David Shafer

2007-04-01T23:59:59.000Z

207

Air Quality Scoping Study for Ash Meadows National Wildlife Refuge, Nevada (EMSI April 2007)  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S.Department of Energys Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at seven sites outside the NTS, including Ash Meadows National Wildlife Refuge, Sarcobatus Flat, Beatty, Rachel, Caliente, Pahranagat National Wildlife Refuge, and Crater Flat, and at four sites on the NTS. The trailer is stationed at any one site for approximately eight weeks at a time. Letter reports provide summaries of air quality and meteorological data, on completion of each sites sampling program.

Johann Engelbrecht, Ilias Kavouras, Dave Campbell, Scott Campbell, Steven Kohl and David Shafer

2007-04-01T23:59:59.000Z

208

Meeting Summary Notes  

Broader source: Energy.gov (indexed) [DOE]

National Transportation Stakeholders Forum (NTSF) National Transportation Stakeholders Forum (NTSF) May 26, 2010 Meeting Summary Notes Opening Remarks - Steve O'Connor, DOE Office of Packaging and Transportation Steve O'Connor, DOE/EM Office of Packaging and Transportation welcomed the group to this first National Transportation Stakeholders Forum (NTSF) and thanked the planning committee and the dedication of the Midwest Council of State Government for hosting the meeting. The NTSF will focus on transportation across the DOE complex. Mr. O'Connor announced that the meeting would be recorded and questions for the panel could either be written down and passed to the session moderator or asked via the central microphone. Planners for the meeting have worked to ensure a more engaging panel format and to minimize the use of formal presentations. Mr. O'Connor

209

COR Summary of Experience  

Broader source: Energy.gov (indexed) [DOE]

COR SUMMARY OF EXPERIENCE Effective January 1, 2012, the Office of Federal Procurement Policy (OFPP) added a requirement for past COR experience to qualify for FAC-COR Level II (journeyman level) and III (senior/expert level). At least 1 year of COR experience is required to qualify for Level II; 2 years for Level III. OFPP strongly advises that applicants for Level III have prior experience at Level II. Applicants with no prior experience as an appointed COR must demonstrate proficiency in the specific competencies listed below for the same time period, validated by a cognizant Contracting Officer or Contract Specialist by signature below or an accompanying e-mail. Submit this form to your Site Acquisition Career Manager (SACM) as part of your application

210

Compilation of TRA Summaries  

Broader source: Energy.gov (indexed) [DOE]

September 2011 September 2011 Technology Readiness Assessment Summary Number Title Report Date TRA-1 Waste Treatment and Immobilization Plant (WTP) Analytical Laboratory, Balance of Facilities and LAW Waste Vitrification Facilities at Hanford March 2007 TRA-2 Waste Treatment and Immobilization Plant (WTP) HLW Waste Vitrification Facility at Hanford March 2007 TRA-3 Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility at Hanford March 2007 TRA-4 K Basins Sludge Treatment Process at Hanford August 2007 TRA-5 Savannah River Site Tank 48H Waste Treatment Project at SRS July 2007 TRA-6 233Uranium Downblending and Disposition Project at Oak Ridge/ORNL September 2008 TRA-7 SRS Salt Waste Processing Facility at SRS July 2009

211

Summary.qxd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

S-10 S-10 Summary 3.0 Alternatives For purposes of analysis, DOE used a modular approach in developing alternatives for this EIS. Under this approach, DOE identified a series of discrete projects, which can be linked together in different combinations to achieve the goals of the proposed action. Thus, some projects are included in more than one waste processing alternative. This modular approach provides DOE flexibility in analyzing waste processing alternatives and treatment options and in select- ing the preferred alternative. The facility disposition alternatives analysis con- siders all of the facilities that would be required to implement each waste processing alternative. 3.1 Identifying Alternatives DOE undertook and documented a process to identify the range of reasonable alternatives for

212

Partnership Overview and Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SWP Phase 3 Deployment Project: SWP Phase 3 Deployment Project: Overview and Summary Brian McPherson and Reid Grigg RCSP Annual Review Meeting October 5-7, 2010 Pittsburgh, PA 2 Acknowledgements * Many thanks to the U.S. Department of Energy and NETL for supporting this project * We express our gratitude also to our many industry partners, who have committed a great deal of time, funding and other general support for these projects * The work presented today is co-authored by all partners in the Southwest Partnership 3 Southwest Regional Partnership In all partner states: * major universities * geologic survey * other state agencies * over 50 partners as well as * Western Governors Association * five major utilities * seven energy companies * three federal agencies * the Navajo Nation * many other critical partners

213

2011 NTSF Meeting Summary  

Broader source: Energy.gov (indexed) [DOE]

2 2 National Transportation Stakeholders Forum Denver, Colorado May 11-12, 2011 Meeting Summary Notes The second annual meeting of the National Transportation Stakeholders Forum (NTSF) was held in Denver, Colorado, and was hosted by the Western Governors' Association. Day 1, May 11, 2011 OPENING PLENARY, Keynote: Cynthia Anderson, Chief Operating Officer, Office of Environmental Management, DOE - A Journey to Excellence Ms. Anderson spoke about the Office of Environmental Management's (EM) Journey to Excellence. The mission of EM is to safely transform the environmental legacy of the Cold War into assets available for the Nation's future by completing quality cleanup work on schedule and within cost, delivering demonstrated value to the American taxpayer. Priorities for EM include:

214

FullSummary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Selected Selected NERSC Initiative for Scientific Exploration (NISE) Research Summaries: 2010 Project: D ecadal P redictability i n C CSM4 PI: H aiyan T eng a nd G rant B ranstator, NCAR NERSC R epo: m p9 NISE h ours a warded: 1 .6 M With the NISE award, we have carried out two 25---member CCSM4 ensemble experiments with perturbed initial condition. The ensemble experiment has led to findings that should influence the direction of major ongoing international climate research efforts. In order to provide society with the most accurate possible estimates of climate in the coming decades, the scientific community is devoting much effort to initializing some forecasts in the next IPCC assessment report with estimates of the current state of the climate system. The results

215

Cementitious waste option scoping study report  

SciTech Connect (OSTI)

A Settlement Agreement between the Department of Energy (DOE) and the State of Idaho mandates that all high-level radioactive waste (HLW) now stored at the Idaho Chemical Processing Plant (ICPP) on the Idaho National Engineering and Environmental Laboratory (INEEL) will be treated so that it is ready to be moved out of Idaho for disposal by a target date of 2035. This study investigates the nonseparations Cementitious Waste Option (CWO) as a means to achieve this goal. Under this option all liquid sodium-bearing waste (SBW) and existing HLW calcine would be recalcined with sucrose, grouted, canisterized, and interim stored as a mixed-HLW for eventual preparation and shipment off-Site for disposal. The CWO waste would be transported to a Greater Confinement Disposal Facility (GCDF) located in the southwestern desert of the US on the Nevada Test Site (NTS). All transport preparation, shipment, and disposal facility activities are beyond the scope of this study. CWO waste processing, packaging, and interim storage would occur over a 5-year period between 2013 and 2017. Waste transport and disposal would occur during the same time period.

Lee, A.E.; Taylor, D.D.

1998-02-01T23:59:59.000Z

216

EIS-0407: Amended Notice of Intent to Modify the Scope of the...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Amended Notice of Intent to Modify the Scope of the Environmental Impact Statement EIS-0407: Amended Notice of Intent to Modify the Scope of the Environmental Impact Statement...

217

Summary of Educational Poster Session  

E-Print Network [OSTI]

Summary of Educational Poster Session #12;Summary of Educational Poster Session The educational poster session provided a way of increasing the ordinarily limited time available for discussion presentations. Poster presenters were available for 3 hours to discuss their displays. Poster presentations were

Standiford, Richard B.

218

NERSC-InitialSummary.pptx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Day-1 Summary Day-1 Summary Large Scale Computing and Storage Requirements for Biological and Environmental Research Joint BER / ASCR / NERSC Workshop NERSC Lawrence Berkeley National Laboratory May 7-8, 2009 Summary * Users need for more resources for DOE SC computing - But we need more concrete, science-based justification * Need for predictable throughput - Microbial Genomics and GFDL ESM - Need to differentiate between real-time needs and higher desired batch turnaround * Slow batch turnaround time may be because of queue policy or because of insufficient resources Summary * Data management issues transcend all science areas, multiple projects - Exponentially increasing - Some disagreement on volume at a single site Summary * Users see need for guidance / help in

219

Where is the evidence for emergency planning: a scoping review  

Science Journals Connector (OSTI)

We conducted a scoping review, using as data sources for academic literature ... British Association of Immediate Care Schemes, Emergency Planning College and the Health and Safety Executive, ... the websites of ...

Kirsty Challen; Andrew CK Lee; Andrew Booth; Paolo Gardois

2012-07-01T23:59:59.000Z

220

Cyclicity and the scope of wh-phrases  

E-Print Network [OSTI]

This thesis argues that in a constituent question with a universal quantifier, syntactic reconstruction of the wh-phrase below the quantifier is the source of scope ambiguities. In particular, I argue, based on the interaction ...

Aguero Bautista, Calixto

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

BodyScope: A Wearable Acoustic Sensor for Activity Recognition  

E-Print Network [OSTI]

, speaking, laughing, and coughing. The F-measure of the Support Vector Machine classification of 12 of activities (e.g., eating, drinking, speaking, laughing and coughing) with BodyScope reveals that the system

Toronto, University of

222

Quadrennial Energy Review: Scope, Goals, Vision, Approach, Outreach  

Broader source: Energy.gov [DOE]

This slideshow explains the scope and goals of the first year of the Quadrennial Energy Review (QER). The first year of the QER focuses on energy transmission, storage, and distribution (TS&D).

223

Breakout Session #1 - Discussion of Scope and Strategy  

Broader source: Energy.gov (indexed) [DOE]

of Scope and Strategy Key points about the definition of "EV" * 1 Everyone's Vehicle; Bicycle, Pass Car, Truck, Grid Connected? * 2 E miles vs. G Miles -All Electric operation,...

224

Automated diagnostics scoping study. Final report  

SciTech Connect (OSTI)

The objective of the Automated Diagnostics Scoping Study was to investigate the needs for diagnostics in building operation and to examine some of the current technologies in automated diagnostics that can address these needs. The study was conducted in two parts. In the needs analysis, the authors interviewed facility managers and engineers at five building sites. In the technology survey, they collected published information on automated diagnostic technologies in commercial and military applications as well as on technologies currently under research. The following describe key areas that the authors identify for the research, development, and deployment of automated diagnostic technologies: tools and techniques to aid diagnosis during building commissioning, especially those that address issues arising from integrating building systems and diagnosing multiple simultaneous faults; technologies to aid diagnosis for systems and components that are unmonitored or unalarmed; automated capabilities to assist cause-and-effect exploration during diagnosis; inexpensive, reliable sensors, especially those that expand the current range of sensory input; technologies that aid predictive diagnosis through trend analysis; integration of simulation and optimization tools with building automation systems to optimize control strategies and energy performance; integration of diagnostic, control, and preventive maintenance technologies. By relating existing technologies to perceived and actual needs, the authors reached some conclusions about the opportunities for automated diagnostics in building operation. Some of a building operator`s needs can be satisfied by off-the-shelf hardware and software. Other needs are not so easily satisfied, suggesting directions for future research. Their conclusions and suggestions are offered in the final section of this study.

Quadrel, R.W.; Lash, T.A.

1994-06-01T23:59:59.000Z

225

Appendix B: Summary Tables  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Analysis of Impacts of a Clean Energy Standard as requested by Chairman Bingaman U.S. Energy Information Administration | Analysis of Impacts of a Clean Energy Standard as requested by Chairman Bingaman Appendix B: Summary Tables Table B1. The BCES and alternative cases compared to the Reference case, 2025 2009 2025 Ref Ref BCES All Clean Partial Credit Revised Baseline Small Utilities Credit Cap 2.1 Credit Cap 3.0 Stnds + Cds Generation (billion kilowatthours) Coal 1,772 2,049 1,431 1,305 1,387 1,180 1,767 1,714 1,571 1,358 Petroleum 41 45 43 44 44 44 45 45 45 43 Natural Gas 931 1,002 1,341 1,342 1,269 1,486 1,164 1,193 1,243 1,314 Nuclear 799 871 859 906 942 889 878 857 843 826 Conventional Hydropower 274 306 322 319 300 321 316 298 312 322 Geothermal 15 25 28 25 31 24 27 22 23 24 Municipal Waste 18 17 17 17 17 17 17 17 17 17 Wood and Other Biomass 38 162 303 289 295 301 241 266

226

Annual Planning Summaries: 2013 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3 3 Annual Planning Summaries: 2013 March 25, 2013 2013 Annual Planning Summary for the Argonne Site Office 2013 Annual Planning Summary for the Argonne Site Office March 25, 2013 2013 Annual Planning Summary for the Argonne Site Office 2013 Annual Planning Summary for the Argonne Site Office January 30, 2013 2013 Annual Planning Summary for the Carlsbad Field Office 2013 Annual Planning Summary for the Carlsbad Field Office January 30, 2013 2013 Annual Planning Summary for the Oak Ridge Office 2013 Annual Planning Summary for the Oak Ridge Office January 30, 2013 2013 Annual Planning Summary for the Western Area Power Administration 2013 Annual Planning Summary for the Western Area Power Administration January 29, 2013 2013 Annual Planning Summary for the Idaho Operations Office

227

Missouri Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data More Documents & Publications Virginia -- SEP Summary of Reported Data Kansas City Summary of Reported Data Michigan -- SEP Summary of Reported Data...

228

Kansas City Summary of Reported Data | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Summary of Reported Data Kansas City Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Kansas City, Missouri. Kansas City Summary...

229

FY 2014 Budget Request Summary Table | Department of Energy  

Office of Environmental Management (EM)

Summary Table FY 2014 Budget Request Summary Table Summary Table by Appropriations Summary Table by Organization More Documents & Publications FY 2014 Budget Request Statistical...

230

LM Annual NEPA Planning Summary 2014 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 More Documents & Publications 2010...

231

Connecticut Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Connecticut Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Connecticut. Connecticut Summary of Reported...

232

Greensboro Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Greensboro Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Greensboro. Greensboro Summary of Reported...

233

Omaha, Nebraska Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Omaha, Nebraska Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Omaha, Nebraska. Omaha, Nebraska Summary...

234

New Hampshire Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data New Hampshire Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner New Hampshire. New Hampshire Summary of...

235

Wisconsin Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Wisconsin Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Wisconsin. Wisconsin Summary of Reported Data...

236

Michigan Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Michigan Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Michigan. Michigan Summary of Reported Data...

237

Indianapolis Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Indianapolis Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Indianapolis. Indianapolis Summary of...

238

Los Angeles Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Los Angeles Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Los Angeles. Los Angeles Summary of Reported...

239

Maryland Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Maryland Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Maryland. Maryland Summary of Reported Data...

240

Nevada -- SEP Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Nevada -- SEP Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Nevada -- SEP. Nevada -- SEP Summary of...

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Seattle Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Seattle Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Seattle, Washington. Seattle Summary of Reported...

242

NYSERDA Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data NYSERDA Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner NYSERDA. NYSERDA Summary of Reported Data More...

243

Alabama -- SEP Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Alabama -- SEP Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Alabama -- SEP. Alabama Summary of...

244

Cincinnati Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Cincinnati Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Cincinnati. Cincinnati Summary of Reported...

245

Portland Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Portland Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Portland, Oregon. Portland Summary of Reported...

246

Milwaukee Meeting Summary - July, 1998  

Broader source: Energy.gov (indexed) [DOE]

Milwaukee Meeting Summary - July, 1998 Milwaukee Meeting Summary - July, 1998 Over 150 Members, participants, and observers representing state, tribal, and local governments, regional groups, industry, professional organizations, and the Department of Energy, met to address a variety of issues related to DOE's transportation activities for radioactive materials. A number of Departmental Programs with transportation components were represented, including: the Office of Environmental Management, the Office of Civilian Radioactive Waste Management (including the Yucca Mountain Project Office), the Office of Naval Reactors, the Waste Isolation Pilot Project, and the Office of Defense Programs. Topic Group Summaries and Comments DOE Program Office Discussions General Planning Breakout Discussions

247

Microsoft Word - FINAL_PIC_Dec2008_summary.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Permit scope and relationship to the TC&WM EIS Gerry said another key question is the scoping of the permit. He said some people think the document is not scoped as it should be,...

248

Annual Planning Summaries: 2014 | Department of Energy  

Office of Environmental Management (EM)

4 Annual Planning Summaries: 2014 February 19, 2014 2014 Annual Planning Summary for the Office of Advanced Research Projects Agency - Energy The ongoing and projected...

249

Residential Energy Efficiency Research Planning Meeting Summary...  

Broader source: Energy.gov (indexed) [DOE]

Meeting Summary Report Residential Energy Efficiency Research Planning Meeting Summary Report This report summarizes key findings and outcomes from the U.S. Department of Energy's...

250

Tulsa Roundtable Summary | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Summary of the DOE Office of Indian Energy roundtable held April 14, 2011, in Tulsa, Oklahoma. TulsaRoundtableSummaryv2.pdf More Documents & Publications Pala Roundtable Summary...

251

Biomass Indirect Liquefaction Strategy Workshop: Summary Report...  

Broader source: Energy.gov (indexed) [DOE]

Strategy Workshop: Summary Report Biomass Indirect Liquefaction Strategy Workshop: Summary Report This report is based on the proceedings of the U.S. DOE's Bioenergy Technologies...

252

Compilation of TRA Summaries | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

all TRA Summaries Compilation of TRA Summaries More Documents & Publications K Basins Sludge Treatment Process Technology Readiness Assessment (TRA)Technology Maturation Plan...

253

Safety Training Collaborative Workshop Summary Reports | Department...  

Office of Environmental Management (EM)

Safety Training Collaborative Workshop Summary Reports Safety Training Collaborative Workshop Summary Reports Performed in Collaboration with DOE National Training CenterNational...

254

SLAC National Accelerator Laboratory Technology Marketing Summaries...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SLAC National Accelerator Laboratory Technology Marketing Summaries Here you'll find marketing summaries for technologies available for licensing from the SLAC National Accelerator...

255

2008 Annual Site Environmental Report Summary Pamphlet  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Annual Site Environmental Report Summary Pamphlet 1 2008 ASER Summary Pamphlet Sandia National Laboratories, New Mexico Sandia is a multi-program laboratory operated by Sandia...

256

ARM - Datastreams - aeri01summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

summary summary Documentation Data Quality Plots Citation DOI: 10.5439/1025141 [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Datastream : AERI01SUMMARY Atmospheric Emitted Radiance Interferometer (AERI) 01: summary data Active Dates 1995.07.22 - 2014.01.02 Measurement Categories Radiometric Originating Instrument Atmospheric Emitted Radiance Interferometer (AERI) Measurements Only measurements considered scientifically relevant are shown below by default. Show all measurements Measurement Units Variable Ambient blackbody temperature - apex K ABBapexTemp ( time ) Ambient blackbody temperature K ABBbottomTemp ( time ) Ambient blackbody temperature - rim top K ABBtopTemp ( time )

257

Decision Summaries | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 7, 2014 Summary of Decisions - March 3, 2014 - March 7, 2014 Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710) February 21,...

258

Executive Summary By Blake Johnson  

E-Print Network [OSTI]

Executive Summary By Blake Johnson Creating Business Value with Analytics and Big Data A one and Teradata Corporation, and was led by Blake Johnson, consulting professor in the Department of Management

Straight, Aaron

259

EIS-0385: Notice to Extend the Public Scoping Period and Reschedule Public  

Broader source: Energy.gov (indexed) [DOE]

EIS-0385: Notice to Extend the Public Scoping Period and Reschedule EIS-0385: Notice to Extend the Public Scoping Period and Reschedule Public Scoping Meetings EIS-0385: Notice to Extend the Public Scoping Period and Reschedule Public Scoping Meetings Strategic Petroleum Reserve Due to the extraordinary circumstances created by Hurricane Katrina in the region where the proposed action and public scoping meetings will take place, DOE has extended the public scoping period and revised the dates and locations of the public scoping meetings originally announced in the Notice of Intent to Prepare an Environmental Impact Statement 70 FR 52088; September 1, 2005). DOE/EIS-0385, Department of Energy, Environmental Impact Statement: Site Selection for the Expansion of the Strategic Petroleum Reserve, Notice to Extend the Public Scoping Period and Reschedule Public Scoping Meetings, 70

260

EIS-0385: Notice to Extend the Public Scoping Period and Reschedule Public  

Broader source: Energy.gov (indexed) [DOE]

Notice to Extend the Public Scoping Period and Reschedule Notice to Extend the Public Scoping Period and Reschedule Public Scoping Meetings EIS-0385: Notice to Extend the Public Scoping Period and Reschedule Public Scoping Meetings Strategic Petroleum Reserve Due to the extraordinary circumstances created by Hurricane Katrina in the region where the proposed action and public scoping meetings will take place, DOE has extended the public scoping period and revised the dates and locations of the public scoping meetings originally announced in the Notice of Intent to Prepare an Environmental Impact Statement 70 FR 52088; September 1, 2005). DOE/EIS-0385, Department of Energy, Environmental Impact Statement: Site Selection for the Expansion of the Strategic Petroleum Reserve, Notice to Extend the Public Scoping Period and Reschedule Public Scoping Meetings, 70

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Annual Planning Summaries: 2013 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3 3 Annual Planning Summaries: 2013 March 25, 2013 2013 Annual Planning Summary for the Thomas Jefferson Site Office 2013 Annual Planning Summary for the Thomas Jefferson Site Office March 25, 2013 2013 Annual Planning Summary for the Pacific Northwest Site Office 2013 Annual Planning Summary for the Pacific Northwest Site Office March 25, 2013 2013 Annual Planning Summary for the New Brunswick Laboratory 2013 Annual Planning Summary for the New Brunswick Laboratory March 25, 2013 2013 Annual Planning Summary for the Strategic Petroleum Reserve 2013 Annual Planning Summary for the Strategic Petroleum Reserve March 25, 2013 2013 Annual Planning Summary for the Rocky Mountain Oilfield Testing Center 2013 Annual Planning Summary for the Rocky Mountain Oilfield Testing Center

262

NRC review of Electric Power Research Institute's Advanced Light Reactor Utility Requirements Document - Program summary, Project No. 669  

SciTech Connect (OSTI)

The staff of the US Nuclear Regulatory Commission has prepared Volume 1 of a safety evaluation report (SER), NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Program Summary,'' to document the results of its review of the Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document.'' This SER provides a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review.

Not Available

1992-08-01T23:59:59.000Z

263

University Park Summary of Reported Data  

Broader source: Energy.gov [DOE]

Summary of data reported by Better Buildings Neighborhood Program partner Town of University Park, Maryland.

264

Maine-- SEP Summary of Reported Data  

Broader source: Energy.gov [DOE]

The summary of reported data for Maine -- SEP, a partner in the Better Buildings Neighborhood Program.

265

Toledo, Ohio, Summary of Reported Data  

Broader source: Energy.gov [DOE]

The summary of reported data for Toledo, Ohio, a partner in the Better Buildings Neighborhood Program.

266

St. Lucie County Summary of Reported Data  

Broader source: Energy.gov [DOE]

Summary of data reported by Better Buildings Neighborhood Program partner St. Lucie County, Florida.

267

Rocky Flats Environmental Technology Site Waste Compliance Order, August 21, 1997 Summary  

Broader source: Energy.gov (indexed) [DOE]

7-08-21-02 7-08-21-02 State Colorado Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Establish compliance requirements and schedules for the implementation of a "Waste Chemical Project Plan" Parties DOE; Kaiser-Hill Company, LLC; Colorado Department of Public Health and Environment Date 8/21/1997 SCOPE * Establish compliance requirements and schedules for the implementation of a "Waste Chemical Project Plan" (the "Waste Chemical Plan") at RFETS. * Resolve violations of the Colorado Hazardous Waste Act and the Colorado Hazardous Waste Regulations. ESTABLISHING MILESTONES * Activities in the Waste Chemical Plan shall be completed by no later than December 31, 1999, except as to Excluded Chemicals (discussed in Paragraph 22 of this Order

268

Rocky Flats Environmental Technology Site Idle Equipment, August 21, 1997 Summary  

Broader source: Energy.gov (indexed) [DOE]

Number: 97-08-21-01 Number: 97-08-21-01 State Colorado Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Establish compliance requirements and schedules for the implementation of 1) the Management Plan for Material Contained in Idle Equipment, 2) the 1997 Hazardous Waste Tank Management Plan Parties DOE; Kaiser-Hill Company, LLC; Colorado Department of Public Health and Environment (CDPHE) Date 8/21/1997 SCOPE * Establish compliance requirements and schedules for the implementation of 1) the Management Plan for Material Contained in Idle Equipment, 2) the 1997 Hazardous Waste Tank Management Plan. * Resolve violations of the Colorado Hazardous Waste Act and the Colorado Hazardous Waste Regulations identified therein. ESTABLISHING MILESTONES * DOE and K-H shall annually submit to the Department, for information only, a

269

Fernald Environmental Management Project Director's Final Findings & Orders, September 10, 1993 Summary  

Broader source: Energy.gov (indexed) [DOE]

9/10/1993 9/10/1993 State Ohio Agreement Type Compliance Order Legal Driver(s) CERCLA Scope Summary Integrate the groundwater monitoring activities required by OAC rules with the site-wide RI/FS groundwater characterization Parties DOE; Fernald Environmental Restoration Management Corporation (FERMCO); Ohio Environmental Protection Agency Date 9/10/1993 SCOPE * Avoid duplication and integrate the groundwater monitoring activities required by OAC rules with the site-wide RI/FS groundwater characterization. In order to facilitate integration and avoid duplication, the Ohio EPA will review and approve portions of CERCLA documents for purposes of demonstrating compliance with OAC rules and these Orders. ESTABLISHING MILESTONES * Within 45 days from the effective date of these Orders, Respondent shall submit a

270

Idaho National Engineering Laboratory Federal Facility Agreement and Consent Order, December 9, 1991 Summary  

Broader source: Energy.gov (indexed) [DOE]

Federal Facility Agreement and Consent Order Federal Facility Agreement and Consent Order State Idaho Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Ensure that the environmental impacts associated with releases or hazardous substances are thoroughly investigated and that appropriate response action are taken. Parties DOE; US EPA; State of Idaho Date 12/9/1991 SCOPE * Ensure that the environmental impacts associated with releases or hazardous substances are thoroughly investigated and that appropriate response action are taken. * Establish a procedural framework and schedule for developing, prioritizing, implementing, and monitoring appropriate response actions. * Supersede the Consent Order and Compliance Agreement Docket No. 1086-05-16- 3008/3013, executed on July 10, 1987.

271

Portsmouth Gaseous Diffusion Plant Director's Final Findings and Orders, March 18, 1999 Summary  

Broader source: Energy.gov (indexed) [DOE]

Integrated Units) Integrated Units) State Ohio Agreement Type Federal Facility Agreement Legal Driver(s) Ohio EPA Scope Summary Integrating the PORTS on-site closure work required by various sources in order to avoid duplication of effort, and efficiently perform sitewide ground water monitoring and surveillance and maintenance activities Parties DOE; Bechtel Jacobs Company LLC; State of Ohio Environmental Protection Agency Date 3/18/1999 SCOPE * Integrate the on-site closure work required for specific units to avoid duplication of effort, and efficiently perform sitewide ground water monitoring and surveillance and maintenance activities at PORTS. * Recognize that a substantial portion of the tasks required under existing approved closure plans have been completed and incorporate the remaining tasks into the

272

Savannah River Site Consent Order 99-41-HW, September 28, 1999 Summary  

Broader source: Energy.gov (indexed) [DOE]

41-HW 41-HW State South Carolina Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Establish guidelines for developing a closure plan for the Beta-Gamma Incinerator Tank and an approval plan for all previously unidentified sources of hazardous or mixed wastes at the facility Parties DOE; Westinghouse Savannah River Company; State of South Carolina (Department of Health and Environmental Control) Date 9/28/1999 SCOPE * Establish a course of action due to DOE and WSRC's violation of the Department's Hazardous Waste Management Regulations. * Establish guidelines for developing a closure plan for the Beta-Gamma Incinerator Tank and an approval plan for all previously unidentified sources of hazardous or mixed wastes at the facility. * Establish appropriate milestones.

273

Portsmouth Gaseous Diffusion Plant Director's Final Findings and Orders, February 24, 1998 Summary  

Broader source: Energy.gov (indexed) [DOE]

DUF DUF 6 and LiOH) State Ohio Agreement Type Director's Final Findings and Orders Legal Driver(s) RCRA Scope Summary Establish Compliance Orders and schedules regarding the LiOH Storage Plan/LiOH removal, and the DUF 6 Management Plan. Parties DOE; Ohio Environmental Protection Agency; Lockheed Martin Energy Systems, Inc. Date 2/24/1998 SCOPE * Establish Compliance Orders and schedules regarding the LiOH Storage Plan/LiOH removal, and the DUF 6 Management Plan. * Exempt Respondents from 1) the requirement to evaluate the LiOH, according to OAC rule 3745-52-11, and 2) evaluate the DUF 6 that is both generated and stored at the facility, according to OAC rule 3745-52-11. ESTABLISHING MILESTONES * DOE shall submit to Ohio EPA on or before 31 December of each year until DOE's

274

Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary  

Broader source: Energy.gov (indexed) [DOE]

155-W 155-W State South Carolina Agreement Type Consent Order Legal Driver(s) CWA Scope Summary Establish/update the course of action and the appropriate milestones pertaining to outfall A01 Parties DOE; Westinghouse Savannah River Company; State of South Carolina (Department of Health and Environmental Control) Date 10/11/1999 SCOPE * Establish/update the course of action and the appropriate milestones pertaining to outfall A01. ESTABLISHING MILESTONES * By August 1, 2000, SRS shall submit to the Department plans and specifications for the compliance activities described in the preliminary engineering report (PER) previously submitted for outfall A01. * Comply with final effluent limits for chronic toxicity, copper, lead, and TRC at outfall A01 by October 1, 2001.

275

Idaho National Engineering & Environmental Laboratory Consent Order, April 19, 199 Summary  

Broader source: Energy.gov (indexed) [DOE]

Third Modification to Consent Order Third Modification to Consent Order Idaho Code § 39-44-13 State Idaho Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Modify the language of Section 6.20.E.1 of the Consent Order Parties DOE; US EPA; Idaho Department of Health and Welfare Date 4/19/1999 SCOPE * Modify the language of Section 6.20.E.1 of the Consent Order as it appears in Section VI of the Second Modification to Consent Order so that the date of "April 30, 1999" is replaced with the date of "June 1, 2000" in the two places it appears. * Unless specifically provided herein, all terms and conditions of the Consent Order and the Second Modification to Consent Order remain in effect. ESTABLISHING MILESTONES * Milestones are not discussed in this Modification to Consent Order.

276

Settlement Agreement on TRU Mixed Waste Storage at Nevada Test Site Summary  

Broader source: Energy.gov (indexed) [DOE]

Settlement Agreement for Transuranic (TRU) Mixed Settlement Agreement for Transuranic (TRU) Mixed Waste Storage Issues at the Nevada Test Site (NTS) State Nevada Agreement Type Settlement Agreement Legal Driver(s) RCRA Scope Summary Settle the Finding of Alleged Violation (FOAV) and Order of November 1, 1990, and the FOAV of June 24, 1991, related to the TRU waste storage pad at Area 5 of the NTS Parties DOE; Nevada Department of Environmental Protection Date 6/11/1992 SCOPE * Settle the Finding of Alleged Violation (FOAV) and Order of November 1, 1990, and the FOAV of June 24, 1991, related to the TRU waste storage pad at Area 5 of the NTS. ESTABLISHING MILESTONES * Within 90 days of the effective date of this Agreement, DOE will provide to NDEP documentation of why the current inventory of TRU mixed waste cannot be removed

277

Idaho National Engineering & Environmental Laboratory Consent Order, January 25, 2001 Summary  

Broader source: Energy.gov (indexed) [DOE]

Consent Order Consent Order Idaho Code § 39-4413 State Idaho Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Resolve the alleged violation listed in the Notice of Violation (NOV) dated August 7, 2000 without litigation Parties DOE; Idaho Department of Environmental Quality; Bechtel BWXT Idaho, LLC (BBWI) Date 1/25/2001 SCOPE * Resolve the alleged violation listed in the Notice of Violation (NOV) dated August 7, 2000 without litigation. ESTABLISHING MILESTONES * Deadlines for resolving NOV issues are provided in this Order. * If any event occurs that causes delay in the achievement of any compliance deadline or requirement of this Order, DOE and BBWI shall notify the Department in writing within 14 days. * DOE or BBWI may request an extension of the compliance deadlines established

278

Notices ACTION: Notice of Intent. SUMMARY: The U.S. Army Corps of  

Broader source: Energy.gov (indexed) [DOE]

5 Federal Register 5 Federal Register / Vol. 76, No. 189 / Thursday, September 29, 2011 / Notices ACTION: Notice of Intent. SUMMARY: The U.S. Army Corps of Engineers, Charleston District intends to prepare a Draft Environmental Impact Statement (DEIS) to assess the potential social, economic and environmental effects of the proposed construction and operation of a gold mine in order to extract and process gold from the Haile ore body in wetlands and streams associated with Haile Gold Mine Creek, by Haile Gold Mine, Inc. (Haile) in the vicinity of Kershaw, in Lancaster County, South Carolina. The DEIS will assess potential effects of a range of alternatives. DATES: General Public Scoping Meeting: One Public Scoping meeting is planned for Thursday October 27, 2011 beginning at 5 p.m. EDT at the Andrew

279

Rocky Flats Environmental Technology Site Mixed Residue Consent Order, September 24, 1999 Summary  

Broader source: Energy.gov (indexed) [DOE]

9-09-24-01 9-09-24-01 State Colorado Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Substitute this Consent Order for the MR Consent Order; establish requirements for mixed residues management. Parties DOE ; Kaiser-Hill Company, LLC; Safe Sites of Colorado, LLC; Rocky Mountain Remediation Services, LLC; Colorado Department of Public Health and Environment Date 9/24/1999 SCOPE * Substitute this Consent Order for the MR Consent Order by modifying in its entirety the Settlement Agreement and Compliance Order on Consent, number 93-04-23-01, (the "MR Consent Order"). * Establish requirements for certain activities involving mixed residues management. * Establish enforceable commitment dates. ESTABLISHING MILESTONES * Provisions regarding enforceable commitment dates and the procedures to add

280

U.S. Federal Facility Compliance Agreement for the Hanford Site, February 7, 1994 Summary  

Broader source: Energy.gov (indexed) [DOE]

for Radionuclide for Radionuclide NESHAP State Washington Agreement Type Federal Facility Compliance Agreement Legal Driver(s) CAA Scope Summary Bring DOE's Hanford site into compliance with CAA Parties EPA; DOE; Richland Operations Office (RL) Date 02/07/1994 SCOPE * Bring DOE's Hanford site into compliance with CAA. This Compliance Plan contains a schedule for DOE to evaluate the monitoring systems associated with Designated Stacks to ensure that these systems conform to the standards for continuous monitoring systems in 40 Code of Federal Regulations (CFR) Part 61, Subpart H. ESTABLISHING MILESTONES * Beginning 30 days after the effective date of this Agreement, DOE shall submit quarterly progress reports to EPA until the requirements contained in Amendment A

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Fernald Environmental Management Project Consent Agreement and Final Order, September 30, 1993 Summary  

Broader source: Energy.gov (indexed) [DOE]

Consent Agreement and Final Order Consent Agreement and Final Order Docket No. RCRA-V-W-89-R-11 State Ohio Agreement Type Consent Agreement Legal Driver(s) RCRA Scope Summary Resolve complaints filed against Westinghouse Materials Company of Ohio, Inc. Parties Westinghouse Materials Company of Ohio, Inc.; US EPA Date 9/30/1993 SCOPE * Resolve complaints filed by US EPA against Westinghouse Materials Company of Ohio, Inc., February 9, 1989 and amended on December 18, 1989. ESTABLISHING MILESTONES * Specific milestones are not discussed in this Final Order. FUNDING * No specific provisions are set forth in this document. PENALTIES * Respondent shall pay a civil penalty in the amount of $95,000 within 30 days of the effective date of this Final Order. A late payment charge of $10 will be imposed for

282

The Oak Ridge Reservation PCB Federal Facilities Compliance Agreement, October 28, 1996 Summary  

Broader source: Energy.gov (indexed) [DOE]

Compliance Agreement Between The United States Compliance Agreement Between The United States Department of Energy and The United States Environmental Protection Agency Region 4 - Toxic Substances Control Act (Also Known As The Oak Ridge Reservation Polychlorinated Biphenyl Federal Facilities Compliance Agreement (ORR-PCB-FFCA)) State Tennessee Agreement Type Federal Facility Agreement Legal Driver(s) TSCA Scope Summary Bring DOE's Oak Ridge Reservation (ORR) into compliance with TSCA and its implementing regulations at 40 CFR Part 761, "Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions" Parties DOE; US EPA Date 10/28/1996 SCOPE * Bring DOE's Oak Ridge Reservation (ORR) into compliance with TSCA and its implementing regulations at 40 CFR Part 761, "Polychlorinated Biphenyls (PCBs)

283

Idaho National Engineering & Environmental Laboratory Consent Order, April 3, 1992 Summary  

Broader source: Energy.gov (indexed) [DOE]

Consent Order § 39-4413 State Idaho Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Resolve the Notice of Noncompliance (NON), Docket No. 1090-1-24-6601, issued by EPA to DOE on January 29, 1990 Parties DOE; US EPA; Idaho Department of Health and Welfare Date 4/3/1992 SCOPE * Resolve the Notice of Noncompliance (NON), Docket No. 1090-1-24-6601, issued by EPA to DOE on January 29, 1990. ESTABLISHING MILESTONES * Deadlines relevant to each violation are set forth in this Consent Order. * If any event occurs that causes, or may cause, delay in the achievement of any compliance deadline or other requirement of this Consent Order, DOE shall notify the Department in writing within 10 days of the date DOE knew, or reasonably should have known of the event.

284

Federal Facility Compliance Agreement on Storage of Polychlorinated Biphenyls, August 8, 1996 Summary  

Broader source: Energy.gov (indexed) [DOE]

on Storage of on Storage of Polychlorinated Biphenyls, August 8, 1996 State Washington Agreement Type Federal Facility Compliance Agreement Legal Driver(s) TSCA Scope Summary Address DOE and the NNPP's inability to comply at this time with the regulations in 40 Parties DOE; US EPA; US Naval Nuclear Propulsion Program (NNPP) Date 8/8/1996 SCOPE * Address DOE and the NNPP's inability to comply at this time with the regulations in 40 CFR 761.65(a), which require polychlorinated biphenyls (PCBs) stored for disposal to be removed from storage and disposed of within one year of being placed in storage, and the Department of Transportation (DOT) container specifications in 40 CFR 761.65(c)(6). ESTABLISHING MILESTONES * Annually, starting six months after the effective date of this Agreement, DOE and the

285

Fernald Environmental Management Project Consent Agreement as Amended, September 20, 1991 Summary  

Broader source: Energy.gov (indexed) [DOE]

Fernald Environmental Management Project Consent Fernald Environmental Management Project Consent Agreement as Amended Under CERCLA Sections 120 and 106(a), September 20, 1991 State Ohio Agreement Type Consent Agreement Legal Driver(s) CERCLA Scope Summary Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the Site Parties DOE; US EPA Date 9/20/1991 SCOPE * Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the Site. * Establish requirements for conducting the removal actions identified in this Agreement and for the performance of Remedial Investigations (RI) and a Site-Wide Projected Residual Remedial Action. ESTABLISHING MILESTONES * Either a timetable, deadline, or a schedule shall be extended upon receipt of a timely

286

West Valley Demonstration Project Administrative Consent Order, March 5, 1992 Summary  

Broader source: Energy.gov (indexed) [DOE]

Administrative Order on Consent Administrative Order on Consent DOCKET No. II RCRA-3008(h)-I 92-0202 State New York Agreement Type Consent Order Legal Driver(s) RCRA Scope Summary Protect human health and the environment from releases of hazardous waste and/or hazardous constituents Parties DOE; US EPA; New York State Energy Research and Development Authority; New York State Department of Environmental Conservation Date 3/5/1992 SCOPE * Protect human health and the environment from releases of hazardous waste and/or hazardous constituents. * Perform Interim Measures (IM) at the Facility to reduce or eliminate any threats to human health or the environment. * Perform a RCRA Facility Investigation (RFI) to determine fully the nature and extent of any release(s) of hazardous waste and/or hazardous constituents from the Facility into

287

Scoping the Environmental Assessment Process for a MRS | Department of  

Broader source: Energy.gov (indexed) [DOE]

Scoping the Environmental Assessment Process for a MRS Scoping the Environmental Assessment Process for a MRS Scoping the Environmental Assessment Process for a MRS Reaching negotiated agreement with a state or Indian tribe and preparing of the environmental assessment (EA) required by Section 404 of the Nuclear Waste Policy Act, as amended (NWPAA), are the first steps in a process intended to result in the acceptance of radioactive waste at a monitored retrievable storage (MRS) facility starting in 1998. This paper examines requirements for the EA, the first environmental document to be prepared for siting an MRS facility, and discusses the process used to develop that document. The EA process can be conducted in an efficient manner to produce a high-quality product, with full public involvement, that meets

288

DOE Environmental Impact Statement Public Scoping Meeting on Champlain  

Broader source: Energy.gov (indexed) [DOE]

DOE Environmental Impact Statement Public Scoping Meeting on DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project June 30, 2010 - 3:28pm Addthis Washington, D.C. --The Department of Energy (DOE) is hosting seven meetings for public participation as part of its Environmental Impact Statement (EIS) preparation process pursuant to the National Environmental Policy Act (NEPA) to assess the potential environmental impacts from its proposed action of granting a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new electric transmission line across the U.S.- Canada border in northeastern New York.

289

The REDD Opportunities Scoping Exercise (ROSE) | Open Energy Information  

Open Energy Info (EERE)

REDD Opportunities Scoping Exercise (ROSE) REDD Opportunities Scoping Exercise (ROSE) Jump to: navigation, search Name The REDD Opportunities Scoping Exercise (ROSE): A Tool for Prioritizing Sub-National REDD+ Activities - Case Studies from Ghana, Tanzania, and Uganda Agency/Company /Organization The Katoomba Group, Forest Trends, Nature Conservation Research Centre Sector Land Focus Area Forestry Topics Implementation, Policies/deployment programs, Pathways analysis, Background analysis Resource Type Guide/manual Website http://www.forest-trends.org/d Country Ghana, Tanzania, Uganda UN Region "Sub-Saharan Africa" is not in the list of possible values (Eastern Africa, Middle Africa, Northern Africa, Southern Africa, Western Africa, Caribbean, Central America, South America, Northern America, Central Asia, Eastern Asia, Southern Asia, South-Eastern Asia, Western Asia, Eastern Europe, Northern Europe, Southern Europe, Western Europe, Australia and New Zealand, Melanesia, Micronesia, Polynesia, Latin America and the Caribbean) for this property.

290

EIS-0463: Amended Notice of Intent To Modify the Scope of the EIS and  

Broader source: Energy.gov (indexed) [DOE]

3: Amended Notice of Intent To Modify the Scope of the EIS 3: Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, Notice of Floodplains and Wetlands Involvement EIS-0463: Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, Notice of Floodplains and Wetlands Involvement Department of Energy - Presidential Permit Application for Northern Pass Transmission, New Hampshire DOE announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement (DOE/EIS-0463) and conduct additional public scoping meetings. EIS-0463-AmendedNOI-2013.pdf More Documents & Publications Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands

291

EIS-0463: Amended Notice of Intent To Modify the Scope of the EIS and  

Broader source: Energy.gov (indexed) [DOE]

63: Amended Notice of Intent To Modify the Scope of the EIS 63: Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, Notice of Floodplains and Wetlands Involvement EIS-0463: Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, Notice of Floodplains and Wetlands Involvement Department of Energy - Presidential Permit Application for Northern Pass Transmission, New Hampshire DOE announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement (DOE/EIS-0463) and conduct additional public scoping meetings. EIS-0463-AmendedNOI-2013.pdf More Documents & Publications Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands

292

Emergency Management Limited Scope Performance Test Inspectors Guide  

Broader source: Energy.gov (indexed) [DOE]

Emergency Management Emergency Management Oversight (HS-63) Emergency Management Limited Scope Performance Test Inspectors Guide March 2008 Emergency Management Performance Test Inspectors Guide Preface i Preface As part of an effort to enhance the appraisal process, the Office of Independent Oversight and the Office of Emergency Management Oversight (HS-63) have prepared a series of documents that collectively provide comprehensive guidance and tools for the evaluation of emergency management programs across the Department of Energy /National Nuclear Security Administration (DOE/NNSA) complex. The Independent Oversight Appraisal Process Protocols describe the philosophy, scope, and general procedures applicable to all independent oversight appraisal activities. The HS-63 Emergency

293

Notice of Extension of Scoping Period for the Notice of Intent to Prepare a Site-Wide Environmental Impact Statement (DOE/EIS-0378) (01/06/06)  

Broader source: Energy.gov (indexed) [DOE]

27 Federal Register 27 Federal Register / Vol. 71, No. 4 / Friday, January 6, 2006 / Notices Dated: December 23, 2005. John Engbring, Acting Manager, California/Nevada Operations Office, U.S. Fish and Wildlife Service. Philip T. Feir, Lieutenant Colonel, Commanding, San Francisco District, U.S. Army Corps of Engineers. [FR Doc. 06-102 Filed 1-5-06; 8:45 am] BILLING CODE 3710-19-M DEPARTMENT OF ENERGY National Nuclear Security Administration Extension of Scoping Period for the Notice of Intent To Prepare a Site-Wide Environmental Impact Statement AGENCY: National Nuclear Security Administration, DOE. SUMMARY: The National Nuclear Security Administration (NNSA), an agency within the U.S. Department of Energy (DOE), is extending the scoping period for the Site-Wide Environmental

294

DOE-ID Operations Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

June 5, 2013 June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993. Advanced Mixed Waste Treatment Project (AMWTP) [No items to Report] Idaho Cleanup Project (ICP) May 15 - 30, 2013: CH2M-WG Idaho, LLC discovered three instances of new information at the Integrated Waste Treatment Unit (IWTU) which have the potential to impact the nuclear safety analysis

295

Summary | Building Energy Codes Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary Summary The impact of energy codes on our future is apparent. From environmental and resource conservation to national security, energy concerns, and our economic challenges, energy codes will continue to be a key component of a sound public policy. For further information on building energy code adoption, compliance, and enforcement, review the ACE toolkits Adoption Compliance Enforcement Popular Links ACE Learning Series ACE Overview Top 10 Reasons for Energy Codes Development of Energy Codes Adoption of Energy Codes Compliance with Energy Codes Enforcement of Energy Codes Going Beyond Code Summary Acronyms and Abbreviations Toolkit Definitions Adoption Toolkit Compliance Toolkit Enforcement Toolkit Contacts Web Site Policies U.S. Department of Energy USA.gov Last Updated: Thursday, January 31, 2013 - 15:19

296

DOE-ID Operations Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

January 6, 2014 January 6, 2014 DOE-ID Operations Summary For the Period November 01, 2013 through November 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) Nothing to Report Notable Accomplishments: Contracting companies supporting EM's cleanup program and the Office of Nuclear Energy at the Idaho site volunteered to be among the first to use a new DOE

297

EIA - AEO2010 - Executive Summary  

Gasoline and Diesel Fuel Update (EIA)

Executive Summary Executive Summary Annual Energy Outlook 2010 with Projections to 2035 Executive Summary In 2009, U.S. energy markets continued to show the impacts of the economic downturn that began in late 2007. After falling by 1 percent in 2008, total electricity generation dropped by another 3 percent in 2009. Although other factors, including weather, contributed to the decrease, it was the first time in the 60-year data series maintained by the EIA that electricity use fell in two consecutive years. Over the next few years, the key factors influencing U.S. energy markets will be the pace of the economic recovery, any lasting impacts on capital-intensive energy projects from the turmoil in financial markets, and the potential enactment of legislation related to energy and the environment.

298

Physics and Cancer Project Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Summary Project Summary HELP Index Summary Scenario Reference Student Pages Subject/Content Area: Physics and/or Integrated Biology, Chemistry and Physics Target Audience: This project primarily targets grades 9-12. The relevant curricular guidelines include electrical forces and interactions, the spectrum and energy of electromagnetic radiation, a basic understanding of the Standard Model, conservation of mass/energy, effects of radiation on living cells, etc. Students will primarily be physics students or integrated lab science students who are involved in an analysis of an open-ended study of the application of physics to radiation therapy. Skills that are required include a basic background in the language of science and the ability to perform independent research (including searching with the Internet),

299

DOE-ID Operations Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

26, 2013 26, 2013 DOE-ID Operations Summary For the Period July 29, 2013 through August 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) July 31, 2013: The Idaho Treatment Group, LLC (ITG), the managing contractor for the Advanced Mixed Waste Treatment Project received a warning letter from the State of Idaho's Department of Environmental quality regarding self- reported RCRA permit violations which

300

Wind energy systems: program summary  

SciTech Connect (OSTI)

The Federal Wind Energy Program (FWEP) was initiated to provide focus, direction and funds for the development of wind power. Each year a summary is prepared to provide the American public with an overview of government sponsored activities in the FWEP. This program summary describes each of the Department of Energy's (DOE) current wind energy projects initiated or renewed during FY 1979 (October 1, 1978 through September 30, 1979) and reflects their status as of April 30, 1980. The summary highlights on-going research, development and demonstration efforts and serves as a record of progress towards the program objectives. It also provides: the program's general management structure; review of last year's achievements; forecast of expected future trends; documentation of the projects conducted during FY 1979; and list of key wind energy publications.

None

1980-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DOE-ID Operations Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

18, 2013 18, 2013 DOE-ID Operations Summary For the Period September 30, 2013 through October 31, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) October 15, 2013: A manager at the Advanced Mixed Waste Treatment Project (AMWTP) determined that the AMWTP Safety Analysis process required review due to an operational trend of fire/combustion events in the Treatment Facility (TF) box lines. Safety analysis for the TF is

302

September 2008 EMAB Recommendation Summary  

Broader source: Energy.gov (indexed) [DOE]

SUMMARY OF RECOMMENDATIONS SUMMARY OF RECOMMENDATIONS Recommendation 2008-12: Develop a strategic communications plan, or roadmap, in preparation for the next administration. Recommendation 2008-13: Expand outreach efforts to build support for, and acceptance of the EM program. Recommendation 2008-14: Update publications and other informational materials that help promote EM's mission. Recommendation 2008-15: Encourage efforts that promote and institutionalize the use of plain language in all communications. Recommendation 2008-16: Develop Standard Operating Policies and Procedures for the Office of Communications and External Affairs. Recommendation 2008-17: Complete the build-out of financial, analytical tools for strategic planning. Recommendation 2008-18:

303

Summary of Prioritized Research Opportunities  

Broader source: Energy.gov (indexed) [DOE]

Summary of Prioritized Summary of Prioritized Research Opportunities Building America Program Planning Meeting Washington, D.C. - November 2-4, 2010 February 2011 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name,

304

Property:NEPA ScopingInitiatedDate | Open Energy Information  

Open Energy Info (EERE)

ScopingInitiatedDate ScopingInitiatedDate Jump to: navigation, search Property Name NEPA ScopingInitiatedDate Property Type Date This is a property of type Date. Pages using the property "NEPA ScopingInitiatedDate" Showing 25 pages using this property. (previous 25) (next 25) B BLM-NV-WN-ES-08-01-1310, NV-020-08-01 + 3 December 2006 + C CA-017-05-051 + 10 February 2005 + CA-170-02-15 + 6 December 2001 + CA-96062042 + 6 June 1996 + D DOE-EA-1621 + 4 June 2008 + DOE-EA-1676 + 8 June 2008 + DOE-EA-1733 + 11 December 2009 + DOE-EA-1759 + 19 February 2010 + DOE-EIS-0298 + 18 April 1997 + DOI-BLM-CA-C050-2009-0005-EA + 9 April 2009 + DOI-BLM-CA-ES-2013-002+1793-EIS + 16 November 2012 + DOI-BLM-ID-220-2009-EA-3709 + 26 June 2009 + DOI-BLM-NV-B010-2011-0015-EA + 6 August 2010 +

305

DISCUSSION: ECONOMIES OF SCALE AND SCOPE IN AGRICULTURAL BIOTECHNOLOGY RESEARCH  

E-Print Network [OSTI]

DISCUSSION: ECONOMIES OF SCALE AND SCOPE IN AGRICULTURAL BIOTECHNOLOGY RESEARCH JEREMY D. FOLTZ Evolution in science such as recent develop- ments in agricultural biotechnology creates new challenges and the private sectors. The present exponential growth in agricul- tural biotechnology research in both the pub

Foltz, Jeremy D.

306

CREATIVE CONCEPTUAL DESIGN: EXTENDING THE SCOPE BY INFUSED DESIGN  

E-Print Network [OSTI]

1 CREATIVE CONCEPTUAL DESIGN: EXTENDING THE SCOPE BY INFUSED DESIGN Offer Shai School of Mechanical infused design that guarantees generating design solutions by transforming systems and methods from remote. This process is partially supported by a computer tool. We describe the method of infused design and illustrate

Shai, Offer

307

ESPC ENABLE Scope of Work Template and Guide  

Broader source: Energy.gov [DOE]

Document provides a template to be drafted by the agency and presented to energy service company (ESCO) prior to the kickoff meeting for the investment grade audit (IGA). The scope of work (SOW) will then be included in the ESCO's final proposal, which is presented to the agency after the IGA and prior to final negotiations.

308

Summary Report on Stakeholder Workshop  

E-Print Network [OSTI]

: Devon Manz Electric Power and Propulsion Systems Lab One Research Circle, Niskayuna, NY, 12309 PhoneSummary Report on Stakeholder Workshop Prepared for U.S. Department of Energy Office of Electricity on Stakeholder Workshop By GE Global Research Niskayuna, New York And University of Hawaii Hawaii Natural Energy

309

CCPExecutiveSummary Collusive Price  

E-Print Network [OSTI]

CCPExecutiveSummary September 2011 Collusive Price Rigidity under Price-Matching Punishments W: www.uea.ac.uk/ccp T: +44 (0)1603 593715 A: UEA, Norwich, NR4 7TJ Collusive Price Rigidity under Price and price rigidity are linked. This belief is formalised in the theory of the kinked demand curve

Feigon, Brooke

310

Separations innovative concepts: Project summary  

SciTech Connect (OSTI)

This project summary includes the results of 10 innovations that were funded under the US Department's Innovative Concept Programs. The concepts address innovations that can substantially reduce the energy used in industrial separations. Each paper describes the proposed concept, and discusses the concept's potential energy savings, market applications, technical feasibility, prior work and state of the art, and future development needs.

Lee, V.E. (ed.)

1988-05-01T23:59:59.000Z

311

POLICY SUMMARY BUSINESS ASSOCIATE CONTRACTS  

E-Print Network [OSTI]

POLICY SUMMARY BUSINESS ASSOCIATE CONTRACTS POLICY NUMBER 2003-04 To comply with HIPAA requirements PRIVACY AND SECURITY POLICY NUMBER 2003-07 To identify the mechanism by which appropriate staff receives policies related to security and privacy of protected health information. BREACHES OF PRIVACY & SECURITY

Oliver, Douglas L.

312

Project Description Executive Summary Report  

E-Print Network [OSTI]

$Total Project Cost: 1,000,000Auxillary Enterprises Balances $ 9,400,000Revenue Financing System Bonds $ 1Project Description Executive Summary Report Project Information Project Budget Project Funding 302-680 Parking Structure Phase I This project consists of a 750 space parking garage of approximately 251

O'Toole, Alice J.

313

CCPExecutiveSummary An Economic  

E-Print Network [OSTI]

CCPExecutiveSummary September 2008 An Economic Assessment of EC Merger Control W: www.ccp.uea.ac.uk T: +44 (0)1603 593715 A: UEA, Norwich, NR4 7TJ An Economic Assessment of EC Merger Control: 1958 dampen the competitive process, by reducing the number of effective competitors, softening competition

Feigon, Brooke

314

Milo M. Backus Professional Summary  

E-Print Network [OSTI]

Milo M. Backus Professional Summary February 9, 2010 Business address: The University of Texas): Marine Exploration, 1998 Midland Reporter-Telegram, 1996 Energy Award with RJ Graebner, ME Trostle: 3D°-phase wavelets: Part 1modeling: Geophysics, v. 70, no. 3, p. C7­C15. Zeng, Hongliu, and Backus, M. M

Yang, Zong-Liang

315

Research Summary George C. Johnson  

E-Print Network [OSTI]

Research Summary George C. Johnson Department of Mechanical Engineering University of California Berkeley, CA 94720-1740 510-642-3371 gjohnson@me.berkeley.edu October, 2010 Professor George Johnson and propagation along grain boundaries and, even- tually, around the obstruction. Professor Johnson's work shows

Mofrad, Mohammad R. K.

316

Regional Summary Pacific Management Context  

E-Print Network [OSTI]

. Bocaccio, Pacific ocean perch, cowcod, and darkblotched and widow rockfish are currently in rebuildingRegional Summary Pacific Management Context The Pacific Region includes California, Oregon, and Washington. Federal fisheries in this region are managed by the Pacific Fishery Management Council (PFMC

317

Food Newsletter Summary November 2013  

E-Print Network [OSTI]

Food Newsletter Summary November 2013 Scottish Government Scotch Beef back on the US menu Seal Bennett. LiveWell for Life Paving the way for sustainable consumption Between July and October of food consumption be in 2050? ­ a discussion paper about what we eat in the future In September 2013

Siddharthan, Advaith

318

Summary Protocol: Identification, Characterization, Designation, Remedial  

Broader source: Energy.gov (indexed) [DOE]

Summary Protocol: Identification, Characterization, Designation, Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification (January 1986) Summary Protocol: Identification, Characterization, Designation, Remedial Action, Certification (January 1986) More Documents & Publications Supplement No. 1 to the FUSRAP Summary Protocol - Designation/Elimination Protocol Pre-MARSSIM Surveys in a MARSSIM World: Demonstrating How Pre-MARSSIM Radiological Data Demonstrate Protectiveness at Formerly Utilized Sites Remedial Action Program Sites U.S. Department of Energy Guidelines for Residual Radioactive Material at

319

Annual Planning Summaries: 2011 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Annual Planning Summaries: 2011 Annual Planning Summaries: 2011 Annual Planning Summaries: 2011 January 20, 2011 2011 Annual Planning Summary for Chicago Operations Office (CH) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Chicago Operations Office (CH) (See Science APS). January 20, 2011 2011 Annual Planning Summary for Nevada Site Office (NSO) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Nevada Site Office (NSO). January 19, 2011 2011 Annual Planning Summary for Southeastern Power Administration (SEPA) The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Southeastern Power Administration (SEPA).

320

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor defueling and disassembly. Summary status report. Volume 3  

SciTech Connect (OSTI)

This document summarizes information relating to the preparations for defueling the Three Mile Island Unit 2 (TMI-2) reactor and disassembly activities being performed concurrently with decontamination of the facility. Data have been collected from activity reports, reactor containment entry records, and other sources and entered in a computerized data sysem which permits extraction/manipulation of specific data which can be used in planning for recovery from a loss of coolant event similar to that experienced at TMI-2 on March 28, 1979. This report contains summaries of man-hours, manpower, and radiation exposures incurred during the period of April 23, 1979 to April 16, 1985, in the completion of activities related to preparation for reactor defueling. Support activities conducted outside of radiation areas are not included within the scope of this report. Computerized reports included in this document are: A chronological summary listing work performed for the period; and summary reports for each major task undertaken in connection with the specific scope of this report. Presented in chronological order for the referenced time period. Manually-assembled table summaries are included for: Labor and exposures by department; and labor and exposures by major activity.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EIS-0463: Amended Notice of Intent To Modify the Scope of the...  

Broader source: Energy.gov (indexed) [DOE]

of the EIS and Conduct Additional Public Scoping Meetings, Notice of Floodplains and Wetlands Involvement EIS-0463: Amended Notice of Intent To Modify the Scope of the EIS and...

322

Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Pahranagat National Wildlife Refuge, Lincoln County, Nevada  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Pahranagat NWR, Beatty, Rachel, Caliente, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data on completion of the site's sampling program.

J. Englebrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2008-08-01T23:59:59.000Z

323

Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Pahranagat National Wildlife Refuge, Lincoln County, Nevada  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Pahranagat NWR, Beatty, Rachel, Caliente, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2009-04-02T23:59:59.000Z

324

Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Tonopah Airport, Nye County, Nevada  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Tonopah Airport, Beatty, Rachel, Caliente, Pahranagat NWR, Crater Flat, and the Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2009-04-02T23:59:59.000Z

325

Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Tonopah Airport, Nye County, Nevada  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Tonopah Airport, Beatty, Rachel, Caliente, Pahranagat NWR, Crater Flat, and the Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D Campbell; S. Campbell; S. Kohl, D. Shafer

2008-08-01T23:59:59.000Z

326

Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Caliente, Lincoln County, Nevada  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Englebrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2008-08-01T23:59:59.000Z

327

Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Crater Flat, Nye County, Nevada  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) (cover page figure) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D. Campbell; S.Campbell; S. Kohl; D. Shafer

2009-04-02T23:59:59.000Z

328

Letter Report: Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Crater Flat, Nye County, Nevada  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) (cover page figure) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2008-08-01T23:59:59.000Z

329

UCSF Sustainability Action Plan: Executive Summary  

E-Print Network [OSTI]

UCSF Sustainability Action Plan: Executive Summary Issue Date: April 21, 2011 #12;UCSF Sustainability Action Plan Executive Summary April 21, 2011 Page 1 Table of Contents An Introduction to the Sustainability Action Plan

Yamamoto, Keith

330

DOE Challenge Home Savings and Cost Estimate Summary | Department...  

Energy Savers [EERE]

Savings and Cost Estimate Summary DOE Challenge Home Savings and Cost Estimate Summary The U.S. Department of Energy Challenge Home Savings and Cost Estimate Summary, November...

331

Eagle County, Colorado Summary of Reported Data | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Summary of Reported Data Eagle County, Colorado Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Eagle County, Colorado. Eagle...

332

Hanford Site C Tank Farm Meeting Summary - May 2011 | Department...  

Office of Environmental Management (EM)

1 Hanford Site C Tank Farm Meeting Summary - May 2011 Hanford Site C Tank Farm Meeting Summary More Documents & Publications Hanford Site C Tank Farm Meeting Summary - September...

333

Hanford Site C Tank Farm Meeting Summary - March 2010 | Department...  

Office of Environmental Management (EM)

March 2010 Hanford Site C Tank Farm Meeting Summary - March 2010 Meeting Summary for Development of the Hanford Site C Tank Farm Performance Assessment Meeting Summary for...

334

2013 Annual Planning Summary for the Sandia Site Office | Department...  

Energy Savers [EERE]

More Documents & Publications 2013 Annual Planning Summary for the Los Alamos Site Office LM Annual NEPA Planning Summary 2014 2012 Annual Planning Summary for Nevada Site Office...

335

Attachment C - Summary GHG Emissions Data FINAL | Department...  

Broader source: Energy.gov (indexed) [DOE]

Attachment C - Summary GHG Emissions Data FINAL Attachment C - Summary GHG Emissions Data FINAL Attachment-C-Summary-GHG-Emissions-Data-FINAL.xlsx Description Attachment C -...

336

TEC Working Group Topic Groups Routing Conference Call Summaries...  

Broader source: Energy.gov (indexed) [DOE]

Routing Conference Call Summaries TEC Working Group Topic Groups Routing Conference Call Summaries CONFERENCE CALL SUMMARIES January 31, 2008 December 6, 2007 October 4, 2007...

337

TEC Working Group Topic Groups Security Conference Call Summaries...  

Office of Environmental Management (EM)

Security Conference Call Summaries TEC Working Group Topic Groups Security Conference Call Summaries Conference Call Summaries August 17, 2006 (Draft) July 18, 2006 (Draft) June...

338

2011 Annual Planning Summary for Bonneville Power Administration...  

Office of Environmental Management (EM)

1 Annual Planning Summary for Bonneville Power Administration (BPA) 2011 Annual Planning Summary for Bonneville Power Administration (BPA) Annual Planning Summaries briefly...

339

University Park Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Park, Maryland. University Park Summary of Reported Data More Documents & Publications New Hampshire Summary of Reported Data Connecticut Summary of Reported Data Alabama...

340

Summary Report from DOE Theory Focus Session on Hydrogen Storage...  

Broader source: Energy.gov (indexed) [DOE]

Summary Report from DOE Theory Focus Session on Hydrogen Storage Materials Summary Report from DOE Theory Focus Session on Hydrogen Storage Materials This report provides a summary...

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Reversible Fuel Cells Workshop Summary Report | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Reversible Fuel Cells Workshop Summary Report Reversible Fuel Cells Workshop Summary Report Summary and presentations from the NREL Reversible Fuel Cells Workshop held April 19,...

342

Toledo, Ohio, Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Toledo, Ohio, Summary of Reported Data The summary of reported data for Toledo, Ohio, a partner in the Better Buildings Neighborhood Program. Toledo, Ohio,...

343

Rutland County Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Rutland County Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Rutland County, Vermont. Rutland County...

344

Maine -- SEP Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Maine -- SEP Summary of Reported Data The summary of reported data for Maine -- SEP, a partner in the Better Buildings Neighborhood Program. Maine -- SEP...

345

Massachusetts -- SEP Summary of Reported Data | Department of...  

Energy Savers [EERE]

Summary of Reported Data Massachusetts -- SEP Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Massachusetts -- SEP. Massachusetts...

346

Efficiency Maine Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Efficiency Maine Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Efficiency Maine. Efficiency Maine...

347

Bainbridge Island Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Bainbridge Island Summary of Reported Data Summary of data for Bainbridge Island, a partner in the U.S. Department of Energy's Better Buildings...

348

Lowell, Massachusetts Summary of Reported Data | Department of...  

Energy Savers [EERE]

Summary of Reported Data Lowell, Massachusetts Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Lowell, Massachusetts. Lowell,...

349

Phoenix, Arizona Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Phoenix, Arizona Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Phoenix, Arizona. Phoenix, Arizona...

350

Camden, New Jersey Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Camden, New Jersey Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Camden, New Jersey. Camden, New...

351

Austin Energy Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Austin Energy Summary of Reported Data Austin Energy Summary of Reported Data, from the U.S. Department of Energy's Better Buildings Neighborhood Program....

352

Chicago Metropolitan Agency for Planning Summary of Reported...  

Energy Savers [EERE]

Summary of Reported Data Chicago Metropolitan Agency for Planning Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Chicago...

353

St. Lucie County Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

St. Lucie County Summary of Reported Data St. Lucie County Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner St. Lucie County,...

354

Southeast Energy Efficiency Alliance Summary of Reported Data...  

Energy Savers [EERE]

Summary of Reported Data Southeast Energy Efficiency Alliance Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Southeast Energy...

355

Austin Energy Summary of Reported Data  

Broader source: Energy.gov [DOE]

Austin Energy Summary of Reported Data, from the U.S. Department of Energy's Better Buildings Neighborhood Program.

356

Bainbridge Island Summary of Reported Data  

Broader source: Energy.gov [DOE]

Summary of data for Bainbridge Island, a partner in the U.S. Department of Energy's Better Buildings Neighborhood Program.

357

GO 2009 Annual NEPA Planning Summary  

Office of Energy Efficiency and Renewable Energy (EERE)

2009 Annual National Environmental Policy Act Planning Summary for the U.S. Department of Energy's Golden Field Office (GO).

358

Fayette County, Pennsylvania Summary of Reported Data  

Broader source: Energy.gov [DOE]

The summary of reported data for Fayette County, Pennsylvania, a partner in the Better Buildings Neighborhood Program.

359

CNEA Fresh Fuel Plate Characterization Summary Report  

SciTech Connect (OSTI)

Characterization summary report outlining the findings of the fresh fuel examinations of the plates received from CNEA.

D. Keiser; F. Rice

2012-02-01T23:59:59.000Z

360

STEP-by-STEP Program Summary  

Broader source: Energy.gov [DOE]

STEP-by-STEP Program Summary, from the Tool Kit Framework: Small Town University Energy Program (STEP).

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

INCORPORATING THE EFFECT OF PRICE CHANGES ON CO2- EQUIVALENT EMSSIONS FROM ALTERNATIVE-FUEL LIFECYCLES: SCOPING THE ISSUES  

E-Print Network [OSTI]

Emissions from Alternative Fuel Lifecycles: Scoping theEMSSIONS FROM ALTERNATIVE-FUEL LIFECYCLES: SCOPING THEACRONYMS and TERMS AF = alternative fuel AFL = alternative-

Delucchi, Mark

2005-01-01T23:59:59.000Z

362

Incorporating the Effect of Price Changes on CO2-Equivalent Emissions From Alternative-Fuel Lifecycles: Scoping the Issues  

E-Print Network [OSTI]

Emissions from Alternative Fuel Lifecycles: Scoping theEMSSIONS FROM ALTERNATIVE-FUEL LIFECYCLES: SCOPING THEACRONYMS and TERMS AF = alternative fuel AFL = alternative-

Delucchi, Mark

2005-01-01T23:59:59.000Z

363

Summary of Inverter Technologies Prepared for the  

E-Print Network [OSTI]

Summary of Inverter Technologies Prepared for the U.S. Department of Energy Office of Electricity Program Subtask 3.1 Photovoltaic Systems: Report 2 Summary of Inverter Technologies Submitted by Hawai agency thereof. #12;1 Summary of Inverter Technologies TableofContents 1. Introduction

364

Summary-Invisible Networking: Techniques and Defenses  

E-Print Network [OSTI]

Summary-Invisible Networking: Techniques and Defenses Lei Wei, Michael K. Reiter, and Ketan Mayer explored. We investigate the combination of these ideas, which we term Summary-Invisible Networking (SIN #12;Summary-Invisible Networking: Techniques and Defenses 211 community of security analysts now holds

Reiter, Michael

365

Microsoft Word - Summary.doc  

Broader source: Energy.gov (indexed) [DOE]

Summary Summary To submit questions regarding this CMRR-NF SEIS, or to request a copy, please contact: AVAILABILITY OF THE FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR THE NUCLEAR FACILITY PORTION OF THE CHEMISTRY AND METALLURGY RESEARCH BUILDING REPLACEMENT PROJECT AT LOS ALAMOS NATIONAL LABORATORY, LOS ALAMOS, NEW MEXICO (CMRR-NF SEIS) Printed with soy ink on recycled paper John Tegtmeier, EIS Document Manager Los Alamos Site Office National Nuclear Security Administration U.S. Department of Energy 3747 West Jemez Road Los Alamos, NM 87544 Telephone: 505-665-0113 Conceptual Drawing CMRR Facility Past Present Future Past Final Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project

366

Untitled Page -- Other Sites Summary  

Office of Legacy Management (LM)

Other Sites Summary Other Sites Summary Search Other Sites Considered Sites Other Sites All LM Quick Search All Other Sites 11 E (2) Disposal Cell - 037 ANC Gas Hills Site - 040 Argonne National Laboratory - West - 014 Bodo Canyon Cell - 006 Burro Canyon Disposal Cell - 007 Cheney Disposal Cell - 008 Chevron Panna Maria Site - 030 Clive Disposal Cell - 036 Commercial (Burial) Disposal Site Maxey Flats Disposal Site - KY 02 Conoco Conquista Site - 031 Cotter Canon City Site - 009 Dawn Ford Site - 038 EFB White Mesa Site - 033 Energy Technology Engineering Center - 044 Estes Gulch Disposal Cell - 010 Exxon Ray Point Site - 032 Fermi National Accelerator Laboratory - 016 Fernald Environmental Management Project - 027 Fort St Vrain - 011 Geothermal Test Facility - 001 Hecla Durita Site - 012

367

Energy Savings Performance Contracts Summary  

Broader source: Energy.gov (indexed) [DOE]

ENERGY SAVINGS PERFORMANCE CONTRACTS SUMMARY ENERGY SAVINGS PERFORMANCE CONTRACTS SUMMARY Site Contract Number Delivery or Task Order # Contractor Performance Period Contract Value Contract Description Richland DE-AC06-97RL13184 N/A Johnson Controls, Inc. 11/15/1996- 11/14/2021 $160.7M Conversion from central coal-fired steam plant to decentralized diesel boilers for Hanford Areas 200 & 300 (Site specific, standalone contract) DE-AM36-97EE73568 DE-AT06-09RL14923 Johnson Controls, Inc. 10/10/2008- 3/31/2033 $19.9M HVAC, Automation, Boiler Improvements Savannah River DE-AM36-02-NT41457 DE-AT09-09SR22572 Ameresco Federal Solutions 5/15/2009- 4/15/2031 $795M Biomass Cogeneration Facility and K and L Area Heating Plants

368

Building Technologies Program Planning Summary  

Broader source: Energy.gov (indexed) [DOE]

Building Technologies Program Planning Summary Building Technologies Program Planning Summary Introduction The U.S. Department of Energy's (DOE) Building Technologies Program (BTP) works in partnership with industry, state, municipal, and other federal organizations to achieve the goals of marketable net-zero energy buildings. Such buildings are extremely energy efficient, ideally producing as much energy as they use over the course of a year. BTP also works with stakeholders and federal partners to meet any remaining energy needs for their buildings through on-site renewable energy systems. Drivers Population growth and economic expansion, along with an accompanying increase in energy demand, are expected to drive energy consumption in buildings to more than 50 quadrillion Btu (quads)

369

ADEQUACY REPORT … EXECUTIVE SUMMARY  

Broader source: Energy.gov (indexed) [DOE]

08 08 ADEQUACY REPORT - EXECUTIVE SUMMARY The electricity industry has gone through major changes in structure, shape, and form over the last decade. All signs indicate that business is far from "as usual". It is prudent at this time to ask if the present approaches can ensure reliable and cost effective supply of electricity over the next two decades and if not, then what is needed to achieve that. This was the prime reason for the formation of the Electricity Advisory Committee (EAC) for which this report was done. The answer to that key question is "no, unless....". A concise set of recommendations is included in this executive summary but more detailed lists are listed in the report. Today, the warning signs are here. Fuel transportation, particularly by rail, is congested,

370

TEC Meeting Evaluations Summary -- Final  

Broader source: Energy.gov (indexed) [DOE]

TEC Meeting Evaluation Summary TEC Meeting Evaluation Summary San Antonio, Texas February 6-7, 2008 Attendee Affiliation: TEC Member Organizations: 19 (38%) State, Tribal or Local Official: 21 (42%) U.S. Department of Energy: 2 (4%) DOE Contractor: 3 (6%) Other (e.g., AULG, DOT): 5 (10%) Assessment of Agenda Topics: DOE Program Updates: 42% very useful 58% somewhat useful Plenary I - Tribal Cultural Discussion: 40% very useful 36% somewhat useful 14% not useful 10% didn't attend Plenary II - Evaluation of Shortline Railroads 56% very useful 38% somewhat useful 6% not useful Plenary III - Addressing Risk Perception 74% very useful 16% somewhat useful 6% not useful 4% didn't attend Assessment of Topic Group Sessions Tribal: 23% very useful

371

2002 WIPP Summary.cdr  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Waste Isolation Pilot Plant Summary Report Office of Independent Oversight and Performance Assurance Office of the Secretary of Energy August 2002 OVERSIGHT Table of Contents 1.0 INTRODUCTION ...................................................................... 1 2.0 STATUS AND RESULTS .......................................................... 4 2.1 Positive Attributes ............................................................... 4 2.2 Program Weaknesses .......................................................... 6 3.0 CONCLUSIONS ....................................................................... 8 4.0 RATINGS .................................................................................10 APPENDIX A - SUPPLEMENTAL INFORMATION ................... 11 APPENDIX B - SITE-SPECIFIC FINDINGS

372

Microsoft Word - Summary.doc  

Broader source: Energy.gov (indexed) [DOE]

0-S1 0-S1 April 2011 Draft Supplemental Environmental Impact Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico Summary Past Past Present Present Future Future Conceptual Drawing CMRR Facility AVAILABILITY OF THE DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT FOR THE NUCLEAR FACILITY PORTION OF THE CHEMISTRY AND METALLURGY

373

2012 Microgrid Workshop Summary Released  

Broader source: Energy.gov [DOE]

The Department of Energy has released the summary report from the July 30-31, 2012 Microgrid Workshop presented by the Office of Electricity Delivery and Energy Reliability at the Illinois Institute of Technology in Chicago. The workshop was held in response to discussions at the preceding DOE Microgrid Workshop, held in August 2011, which called for sharing lessons learned and best practices for system integration from existing projects in the U.S. (including military microgrids) and internationally.

374

EIS-0489-NoticeofAdditionalScopingMeetings-2012.pdf  

Broader source: Energy.gov (indexed) [DOE]

Jordan Cove Energy Project LP Docket No. PF12-7-000 Jordan Cove Energy Project LP Docket No. PF12-7-000 Pacific Connector Gas Pipeline LP Docket No. PF12-17-000 NOTICE OF ADDITIONAL PUBLIC SCOPING MEETINGS FOR THE JORDAN COVE LIQUEFACTION AND PACIFIC CONNECTOR PIPELINE PROJECTS (September 21, 2012) On October 9, 10, and 11, 2012, the Federal Energy Regulatory Commission (FERC or Commission) Office of Energy Projects staff, in cooperation with representatives of the U.S. Department of Agriculture Forest Service (Forest Service) and the U.S. Department of the Interior Bureau of Land Management (BLM), will hold three additional public scoping meetings to take comments on Jordan Cove Energy Project LP's (Jordan Cove) proposed liquefaction project in Coos County, Oregon, in Docket No.

375

Breakout Session #1 - Discussion of Scope and Strategy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Batteries Breakout Session #1 - Discussion of Scope and Strategy Key points about the definition of "EV" * 1 Everyone's Vehicle; Bicycle, Pass Car, Truck, Grid Connected? * 2 E miles vs. G Miles -All Electric operation, CO2 / Petroleum Reduction, Key points about the definition of "Everywhere" * 1 Location, Location, Location - Differentiation Across the Nation. * 2 EV is a normal Car. EV is only car, in it I can go very far. Key points about gaps or missing elements * 1 Appropriate Standards * 2 Broader social and economic issues acceptance, 1 st responder * 3 Education and experience June 21, 2012 Charging/Infrastructure Group Breakout Session #1 - Discussion of Scope and Strategy Key points about the definition of "EV"

376

PROJECT MANGEMENT PLAN EXAMPLES Deactivation Plan Project Scope and  

Broader source: Energy.gov (indexed) [DOE]

Plan Project Scope and Plan Project Scope and Objectives Examples Example 6 2.3 MISSION OBJECTIVES Stabilization of plutonium-bearing materials and deactivation/dismantlement of the PFP Complex will result in the virtual elimination of the hazards and risks associated with the facility and will greatly reduce the costs of safe, secure S&M. Using the lessons learned from deactivation projects across the DOE Complex, further improvement on previously applied deactivation methods is anticipated. The major mission objectives for the PFP Stabilization and Deactivation Project are as follows:  Maintain inventory of plutonium-bearing material in safe and highly secure storage pending shipment offsite;  Maintain the PFP facilities, systems, and residual radioactive and chemical contamination in a safe,

377

Categorization of Scope 3 Emissions for Streamlined Enterprise Carbon Footprinting  

Science Journals Connector (OSTI)

For guidance in how to prepare their footprint inventories, these groups look to existing carbon footprint protocols including the GHG Protocol from the World Resources Institute (WRI) and World Business Council for Sustainable Development (WBCSD) (1), the General Reporting Protocol and sector-specific protocols from The Climate Registry (2), ISO 14064 from the International Organization for Standardization (3), PAS 2050 from the British Standards Institute (4), and the International Local Government GHG Emissions Analysis Protocol from the International Council on Local Government for Sustainability (5). ... Information, Financial, Insurance, Real Estate ... However, in reality, each detailed business type, and in actuality each company, has a unique Scope 3 profile, and there are probably some important Scope 3 categories that are unique to each sector that are not explicitly identified in industry-specific guidelines. ...

Y. Anny Huang; Christopher L. Weber; H. Scott Matthews

2009-10-12T23:59:59.000Z

378

Scoping calculations of power sources for nuclear electric propulsion  

SciTech Connect (OSTI)

This technical memorandum describes models and calculational procedures to fully characterize the nuclear island of power sources for nuclear electric propulsion. Two computer codes were written: one for the gas-cooled NERVA derivative reactor and the other for liquid metal-cooled fuel pin reactors. These codes are going to be interfaced by NASA with the balance of plant in order to making scoping calculations for mission analysis.

Difilippo, F.C. [Oak Ridge National Lab., TN (United States)] [Oak Ridge National Lab., TN (United States)

1994-05-01T23:59:59.000Z

379

SUMMARY  

Broader source: Energy.gov (indexed) [DOE]

4 4 FINAL ENVIRONMENTAL ASSESSMENT FOR SAUK VALLEY COMMUNITY COLLEGE'S WIND ENERGY PROJECT DIXON LEE COUNTY, ILLINOIS U.S. Department of Energy Golden Field Office DECEMBER 2010 DOE/EA 1804 FINAL ENVIRONMENTAL ASSESSMENT FOR SAUK VALLEY COMMUNITY COLLEGE'S WIND ENERGY PROJECT DIXON LEE COUNTY, ILLINOIS U.S. Department of Energy Golden Field Office DECEMBER 2010 DOE/EA 1804 iii November 2010 C OV E R S HE E T RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Final Environmental Assessment for Sauk Valley Community College's Wind Energy Project, Dixon, Lee County, Illinois (DOE/EA 1804). CONTACT: For additional copies or more information on this Environmental Assessment (EA), please contact: John Jediny NEPA Document Manager

380

Summary  

Gasoline and Diesel Fuel Update (EIA)

10)/1 10)/1 Market Assessment of Refinery Outages Planned for March 2010 through June 2010 March 2010 Energy Information Administration Office of Oil and Gas U.S. Department of Energy Washington, DC 20585 This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. Energy Information Administration Market Assessment of Planned Refinery Outages / March 2010 - June 2010

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Summary  

Broader source: Energy.gov (indexed) [DOE]

The Western Area Power Administration (Western), created in 1977 under the Department of Energy (DOE) Organization Act, markets and transmits electric power throughout 15 western states. Western's Sierra Nevada Customer Service Region (Sierra Nevada Region) markets approximately 1,480 megawatts (MW) of power from the Central Valley Project (CVP) and other sources and markets nonfirm energy from the Washoe Project. (1) Western's mission is to market and transmit electricity that is in excess of Project Use (power required for project operations), which for the Sierra Nevada Region is generated from CVP and Washoe Project powerplants. Western's power marketing responsibility includes managing the Federal transmission system. The hydroelectric generation

382

Stock Summary Reports for Columbia River Anadromous Salmonids, Volume 1; Oregon Subbasins Below Bonneville Dam, 1992 CIS Summary Report.  

SciTech Connect (OSTI)

An essential component of the effort to rebuild the Columbia Basin's anadromous fish resources is that available information and experience be organized and shared among numerous organizations and individuals. Past experience and knowledge must form the basis for actions into the future. Much of this knowledge exists only in unpublished form in agency and individual files. Even that information which is published in the form of technical and contract reports receives only limited distribution and is often out of print and unavailable after a few years. Only a small fraction of the basin's collective knowledge is captured in permanent and readily available databases (such as the Northwest Environmental Database) or in recognized journals. State, tribal, and federal fishery managers have recognized these information management problems and have committed to a program, the Coordinated Information System Project, to capture and share more easily the core data and other information upon which management decisions are based. That project has completed scoping and identification of key information needs and development of a project plan. Work performed under the CIS project will be coordinated with and extend information contained in the Northwest Environmental Database. Construction of prototype systems will begin in Phase 3. This report is one in a series of seven describing the results of the Coordinated Information System scoping and needs identification phase. A brief description of each of these reports follows. This report (Roger 1992) summarizes and integrates the results of the next five reports and relates them to deliverables identified in the Phase II cooperative agreement. Broader issues of organization and operation which are not appropriate for the more focused reports are also discussed. This report should be viewed as an executive summary for the CIS project to date. If one wants a quick overview of the CIS project, this report and the project plan will provide that perspective.

Olsen, Eric; Pierce, Paige (Oregon Department of Fish and Wildlife, Clackamas, OR); Hatch, Keith (Columbia River Inter-Tribal Fish Commission, Portland, OR)

1993-05-01T23:59:59.000Z

383

Annual Planning Summaries: 2012 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 2 Annual Planning Summaries: 2012 February 23, 2012 2012 Annual Planning Summary for Oak Ridge Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the Oak Ridge Office. February 8, 2012 2012 Annual Planning Summary for NNSA Defense Nuclear NonProliferation The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within the NNSA Defense Nuclear NonProliferation. February 3, 2012 2012 Annual Planning Summary for Environmental Management The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Environmental Management. February 2, 2012 2012 Annual Planning Summary for Advanced Research Projects Agency-Energy

384

20% Wind Energy by 2030 - Chapter 1: Executive Summary and Overview...  

Office of Environmental Management (EM)

1: Executive Summary and Overview Summary Slides 20% Wind Energy by 2030 - Chapter 1: Executive Summary and Overview Summary Slides Summary and overview slides for 20% Wind Energy...

385

Amended Notice of Intent To Modify the Scope of the EIS and Conduct  

Broader source: Energy.gov (indexed) [DOE]

Notice of Intent To Modify the Scope of the EIS and Conduct Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement for the Northern Pass Project: Federal Register Notice VOlume 78, No. 173 - September 6, 2013 Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement for the Northern Pass Project: Federal Register Notice VOlume 78, No. 173 - September 6, 2013 The U.S. Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement (DOE/EIS-0463) and to conduct additional public scoping meetings. Because the proposed Federal action may involve floodplains and wetlands, the draft

386

Management of Peripheral Scope PMLL Identifier: PMLL-2010-SNL-HSM-0001 (Source: User Submitted)  

Broader source: Energy.gov (indexed) [DOE]

of Peripheral Scope of Peripheral Scope PMLL Identifier: PMLL-2010-SNL-HSM-0001 (Source: User Submitted) Validator: Dawn Harder Date: 12/16/2010 Contact: 505-845-6314 Statement: A common understanding of the project scope is essential for project success. Additionally, agreeing on the treatment of scope that is similar but not part of the project scope is also necessary. Discussion: The Sandia Site Office (SSO) and Sandia National Laboratories (SNL) disagreed on the treatment of two separate scopes of work and their inclusion into the Heating Systems Modernization (HSM) Project. The first scope involved the early shutdown of the steam plant. During the initial planning and design, the Engineer and the SNL Plant Engineers studied the effect(s) expected to be experienced at the steam plant as load was successively removed during the planned three years

387

Fusion Plasma Theory project summaries  

SciTech Connect (OSTI)

This Project Summary book is a published compilation consisting of short descriptions of each project supported by the Fusion Plasma Theory and Computing Group of the Advanced Physics and Technology Division of the Department of Energy, Office of Fusion Energy. The summaries contained in this volume were written by the individual contractors with minimal editing by the Office of Fusion Energy. Previous summaries were published in February of 1982 and December of 1987. The Plasma Theory program is responsible for the development of concepts and models that describe and predict the behavior of a magnetically confined plasma. Emphasis is given to the modelling and understanding of the processes controlling transport of energy and particles in a toroidal plasma and supporting the design of the International Thermonuclear Experimental Reactor (ITER). A tokamak transport initiative was begun in 1989 to improve understanding of how energy and particles are lost from the plasma by mechanisms that transport them across field lines. The Plasma Theory program has actively-participated in this initiative. Recently, increased attention has been given to issues of importance to the proposed Tokamak Physics Experiment (TPX). Particular attention has been paid to containment and thermalization of fast alpha particles produced in a burning fusion plasma as well as control of sawteeth, current drive, impurity control, and design of improved auxiliary heating. In addition, general models of plasma behavior are developed from physics features common to different confinement geometries. This work uses both analytical and numerical techniques. The Fusion Theory program supports research projects at US government laboratories, universities and industrial contractors. Its support of theoretical work at universities contributes to the office of Fusion Energy mission of training scientific manpower for the US Fusion Energy Program.

Not Available

1993-10-01T23:59:59.000Z

388

Advanced fusion concepts: project summaries  

SciTech Connect (OSTI)

This report contains descriptions of the activities of all the projects supported by the Advanced Fusion Concepts Branch of the Office of Fusion Energy, US Department of Energy. These descriptions are project summaries of each of the individual projects, and contain the following: title, principle investigators, funding levels, purpose, approach, progress, plans, milestones, graduate students, graduates, other professional staff, and recent publications. Information is given for each of the following programs: (1) reverse-field pinch, (2) compact toroid, (3) alternate fuel/multipoles, (4) stellarator/torsatron, (5) linear magnetic fusion, (6) liners, and (7) Tormac. (MOW)

None

1980-12-01T23:59:59.000Z

389

National stakeholder workshop summary report  

SciTech Connect (OSTI)

This is a summary of the plenary sessions and small group discussion sessions from the fourth National Stakeholder Workshop sponsored by the DOE Office of Worker and Community Transition held in Atlanta, Georgia on March 13--15, 1996. Topics of the sessions included work force planning and restructuring, worker participation in health and safety, review of actions and commitments, lessons learned in collective bargaining agreements, work force restructuring guidance, work force planning, update on community transition activities. Also included are appendices listing the participants and DOE contacts.

NONE

1996-06-01T23:59:59.000Z

390

TEC Working Group Topic Groups Rail Meeting Summaries | Department of  

Broader source: Energy.gov (indexed) [DOE]

Rail Meeting Summaries Rail Meeting Summaries TEC Working Group Topic Groups Rail Meeting Summaries MEETING SUMMARIES Kansas City TEC Meeting, Rail Topic Group Summary - July 25, 2007 Atlanta TEC Meeting, Rail Topic Group Summary - March 6, 2007 Green Bay Meeting, Rail Topic Group Summary - October 26, 2006 Washington DC TEC Meeting, Rail Topic Group Summary - March 15, 2006 Pueblo TEC Meeting, Rail Topic Group Summary - September 22, 2005 Phoenix TEC Meeting, Rail Topic Group Summary - April 4, 2005 Minneapolis TEC Meeting, Rail Topic Group Summary - September 21, 2004 Albuquerque TEC Meeting, Rail Topic Group Summary - April 22, 2004 New Orleans TEC Meeting, Rail Topic Group Summary - January 29, 2002 Jacksonville TEC Meeting, Rail Topic Group Summary - January 20, 1999 Milwaukee TEC Meeting, Rail Topic Group Summary - July 13, 1998

391

Improving the Quality and Scope of EIA Data  

U.S. Energy Information Administration (EIA) Indexed Site

Electric Power Annual 2012 Electric Power Annual 2012 December 2013 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | Electric Power Annual This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. U.S. Energy Information Administration | Electric Power Annual Table of Contents Chapter 1. National Summary Data Table 1.1. Total Electric Power Industry Summary Statistics

392

BNL | ATF Operations Weekly Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Weekly Summary Operations Weekly Summary Week Starts E-beam Status CO2 Status 2013/12/30 Up time: 0 days Down time: 5 days Activity: Maintenance & holiday week Up time: 0 days Down time: 5 days (setup) Activity: OPA work & holiday week 2013/12/23 Up time: 1 days Down time: 4 days (holiday week) Exp: Beam Studies Group: ATF Energy: 57.6 MeV Charge: 500 pC Up time: 0 days Down time: 5 days Activity: OPA work & holiday week 2013/12/16 Up time: Down time: Exp: AE-58, ERL BPM testing + beam studies Group: AE58, BNL (C-AD) / ATF Energy: 57.6 MeV Charge: 500 pC Up time: 0 days Down time: 5 days (setup) Activity: OPA work, EUVL test setup (AE59) and maintenance 2013/12/09 Up time: Down time: Exp: AE-52, Beam Manipulation by self wakefield Group: AE52, Euclid techlabs Energy: 57.6 MeV

393

Annual Planning Summaries: 2010 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0 0 Annual Planning Summaries: 2010 February 24, 2010 2010 Annual Planning Summary for Energy Efficiency and Renewable Energy Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. February 2, 2010 2010 Annual Planning Summary for Chief Financial Officer (CFO) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. February 1, 2010 2010 Annual Planning Summary for Oak Ridge (OR)

394

Widget:AnalyticsSummary | Open Energy Information  

Open Energy Info (EERE)

AnalyticsSummary AnalyticsSummary Jump to: navigation, search Google Analytics widget that returns an HTML summary of site-wide analytics. Use any arbitrary number of days; for instance, 30-31 days will say "a month", 7 days will say "a week", 1 day will say "a day", 365 days will say "a year", and all other day rates will say "n days". How to call it: {{#Widget:AnalyticsSummary|days=30}} Example Output Loading... Statistics summary for the last 1 7 30 365 days Retrieved from "http://en.openei.org/w/index.php?title=Widget:AnalyticsSummary&oldid=535712" Category: Widgets What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

395

EIS-0391-FEIS-Summary-2012  

Broader source: Energy.gov (indexed) [DOE]

Summary Summary DOE/EIS-0391 Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington Summary U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site,

396

Inspection Summary Report | Department of Energy  

Energy Savers [EERE]

deterrence policy. In the early 1990s, Sandia undertook to design a replacement neutron generator for the W76 nuclear warhead. Topic: National Security and Safety Summary of...

397

Annual Planning Summaries: 2011 | Department of Energy  

Energy Savers [EERE]

Management). January 31, 2011 2011 Annual Planning Summary for Legacy Management (LM) The ongoing and projected Environmental Assessments and Environmental Impact Statements...

398

2009 Wind Technologies Market Report: Executive Summary  

SciTech Connect (OSTI)

This is the Executive Summary of the full report entitled 2009 Wind Technologies Market Report (DOE/GO-102010-3107).

Wiser, R.; Bolinger, M.

2010-08-01T23:59:59.000Z

399

Operating Experience Summary, 2013-03  

Broader source: Energy.gov (indexed) [DOE]

Investigation: Contamination at Los Alamos Neutron Science Center Due to Deficiencies in Conduct of Operations ...5 Page 1 Page 5 Page 1 of 12 Operating Experience Summary...

400

Operating Experience Summaries | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Contamination at Los Alamos Neutron Science Center Due to Deficiencies in Conduct of Operations - Page 5 August 14, 2013 Operating Experience Summary - 2013-02 - August 14,...

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Microsoft Word - CTF Executive Summary 001.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Component Test Facility Test Loop Pre-Conceptual Design Executive Summary December 2008 BEA Contract No. 000 75310 Disclaimer This report was prepared as an account of work...

402

Energize New York Summary of Reported Data  

Broader source: Energy.gov [DOE]

Summary of Reported Data for Energize New York, a partner in the U.S. Department of Energy's Better Buildings Neighborhood Program.

403

Boulder County Summary of Reported Data  

Broader source: Energy.gov [DOE]

Summary of Reported Data for Boulder County, a partner in the U.S. Department of Energy's Better Buildings Neighborhood Program.

404

EV Project Chevrolet Volt Vehicle Summary Report  

Broader source: Energy.gov (indexed) [DOE]

Vehicle Summary Report Region: ALL Number of vehicles: 1766 Reporting period: January 2013 through March 2013 1 A trip is defined as all the driving done between consecutive...

405

IPP RH-TRU Waste Study - Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for evaluation: releases by gas generation, groundwater transport, human intrusion and heat generation. Study Findings A summary of the important findings of the Remote-Handled...

406

Hydrologic Monitoring Summary Long Valley Caldera, California...  

Open Energy Info (EERE)

Caldera, California Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Hydrologic Monitoring Summary Long Valley Caldera, California Abstract Abstract...

407

NNSA's Stockpile Stewardship Program Quarterly Experiments summary...  

National Nuclear Security Administration (NNSA)

science-based stockpile stewardship program is now available here. The quarterly summary prepared by NNSA's Office of Defense Programs provides descriptions of key NNSA facilities...

408

NNSA's Stockpile Stewardship Program Quarterly Experiments summary...  

National Nuclear Security Administration (NNSA)

Science-Based Stockpile Stewardship Program is now available here. The quarterly summary prepared by NNSA's Office of Defense Programs provides descriptions of key NNSA facilities...

409

Independent Oversight Inspection, Pantex Plant, Summary Report...  

Broader source: Energy.gov (indexed) [DOE]

Inspection, Pantex Plant, Summary Report - November 2002 November 2002 Inspection of Environment, Safety, and Health and Emergency Management at the Pantex Plant This report...

410

Independent Oversight Inspection, Savannah River Site, Summary...  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Site, Summary Report - February 2004 February 2004 Inspection of Environment, Safety, and Health Management and Emergency Management at the Savannah River Site...

411

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor building decontamination. Summary status report. Volume 2  

SciTech Connect (OSTI)

This document summarizes information relating to decontamination of the Three Mile Island Unit 2 (TMI-2) reactor building. The report covers activities for the period of June 1, 1979 through March 29, 1985. The data collected from activity reports, reactor containment entry records, and other sources were entered into a computerized data system which permits extraction/manipulation of specific information which can be used in planning for recovery from an accident similar to that experienced at TMI-2 on March 28, 1979. This report contains summaries of man-hours, manpower, and radiation exposures incurred during decontamination of the reactor building. Support activities conducted outside of radiation areas are excluded from the scope of this report. Computerized reports included in this document are: a chronological summary listing work performed relating to reactor building decontamination for the period specified; and summary reports for each major task during the period. Each task summary is listed in chronological order for zone entry and subtotaled for the number of personnel entries, exposures, and man-hours. Manually-assembled table summaries are included for: labor and exposures by department and labor and exposures by major activity.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

412

EIS-0305: Notice Extending the Public Scoping Period for the Environmental  

Broader source: Energy.gov (indexed) [DOE]

Notice Extending the Public Scoping Period for the Notice Extending the Public Scoping Period for the Environmental Impact Statement EIS-0305: Notice Extending the Public Scoping Period for the Environmental Impact Statement Transuranic Waste Treatment Facility at Oak Ridge, Tennessee The Department extends the public scoping period for a Transuranic Waste Treatment Facility at Oak Ridge, Tennessee. To ensure that the public has ample opportunity to provide comments since the public scoping meeting, the comment period is being extended until March 18, 1999. Notice of Intent To Prepare an Environmental Impact Statement for a Transuranic Waste Treatment Facility at Oak Ridge, Tennessee; Notice Extending the Public Scoping Period More Documents & Publications Audit Report: IG-0443 EIS-0309: Notice of Intent to Prepare a Site-Wide Environmental Impact

413

ExecSummary_SRG _staff_  

Broader source: Energy.gov (indexed) [DOE]

Section 180(c) Policy and Procedures Section 180(c) Policy and Procedures This package describes the Section 180(c) Policy and Procedures that the Office of Civilian Radioactive Waste Management (OCRWM) Office of National Transportation (ONT) staff recommends to Department of Energy (DOE) management. This package concludes eighteen months of intensive cooperative work by several stakeholder groups and OCRWM staff. There are three parts to this package: (1) the Executive Summary; (2) two Federal Register Notices -- the Draft Section 180(c) Policy and Procedures and the Draft Grant Application Package; and (3) the Appendices. Background Section 180(c) of the Nuclear Waste Policy Act requires DOE to "provide technical assistance and funds to States for training for public safety officials of appropriate units of

414

Summary of Advice to the  

U.S. Energy Information Administration (EIA) Indexed Site

Summary of Advice to the Energy Information Administration from the American Statistical Association Committee on Energy Statistics at the Spring Meeting March 21-22, 2002 1. Weekly Natural Gas Storage Survey (Priority 1) Presenter: Elizabeth Campbell The Energy Information Administration (EIA) began its first collection of weekly natural gas data in May 2002 with implementation of the Weekly Natural Gas Storage Survey. EIA was directed to begin the new survey after the American Gas Association (AGA) announced its intent to stop operation of its voluntary weekly gas storage survey. The AGA survey has provided the only weekly volumetric data about the U.S. natural gas industry. EIA designed its survey to continue the basic data series which AGA has produced since the end of 1993 but will be making some changes to

415

1.0EXECUTIVE SUMMARY  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ARC-TR-03-0002 ARC-TR-03-0002 Electrochemical Noise Sensors for Detection of Localized and General Corrosion of Natural Gas Transmission Pipelines Final Report for the Period July 2001 - October 2002 December 2002 Sophie J. Bullard, Bernard S. Covino, Jr., James H. Russell, Gordon R. Holcomb, Stephen D. Cramer, and Margaret Ziomek-Moroz Albany Research Center U.S. Department of Energy Albany, OR PREPARED FOR THE UNITED STATES DEPARTMENT OF ENERGY, NATIONAL ENERGY TECHNOLOGY LABORATORY. Work Performed Under Work Package Number FE-01-06 This page left intentionally blank. 2 Electrochemical Noise Sensors for Detection of Localized and General Corrosion of Natural Gas Transmission Pipelines TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY

416

Tappi 80. [Conference proceedings summaries  

SciTech Connect (OSTI)

This article contains summaries based on papers presented at the 1980 Tappi Annual Meeting held in February in Atlanta. Two papers dealing with energy costs are ''planning energy use'' and ''energy savings through advanced boiler control''. The use of forest residues as fuel has been gaining in importance and three papers deal with this topic - ''wood gasification: key to energy self-sufficiency'', ''chemicals and fuel from forest residues'', and ''increasing pulp yield with bark utilization''. Machinery to collect forest material is described in two papers - ''a biomass harvester'' and ''whole-tree chips: state of the art''. Forest management, high yield eucalypt forests and advances in covered-roll-technology are also topics at the meeting.

Not Available

1980-02-01T23:59:59.000Z

417

Carlsbad Area Office Executive Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

June 1998 June 1998 Carlsbad Area Office Executive Summary The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant (WIPP) for safe disposal of transuranic (TRU) waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to CAO, WIPP site operations, transportation, and other activities associated with the National TRU Program (NTP). The CAO develops and directs implementation of the TRU waste program, and assesses compliance with the program guidance, as well as the commonality of activities and assumptions among all TRU waste sites. A cornerstone of the Department of Energy's (DOE) national cleanup strategy, WIPP is

418

Summary of 2008 Building Energy Efficiency Standards Changes Summary of Changes For  

E-Print Network [OSTI]

Summary of 2008 Building Energy Efficiency Standards Changes Summary of Changes For California 2008 Building Energy Efficiency Standards Mazi Shirakh, P.E. Project Manager, Building Energy Efficiency Standards Buildings and Appliances Office California Energy Commission Adopted on April 23, 2008 #12;Summary

419

Summary: Section 4.1, Part 1 Summary: Section 4.1, Part 1  

E-Print Network [OSTI]

all ten vector space axioms hold, we can conclude that S is a vector space. Summary: Section 4.1, PartSummary: Section 4.1, Part 1 Summary: Section 4.1, Part 1 #12;A vector space is a nonempty set V of objects, called vectors, on which are defined addition and scalar multiplication, subject to the ten

Myers, Amy

420

Estimating Demand Response Market Potential Among Large Commercial and Industrial Customers: A Scoping Study  

E-Print Network [OSTI]

2001. Electricity Demand Side Management Study: Review ofEpping/North Ryde Demand Side Management Scoping Study:Energy Agency Demand Side Management (IEA DSM) Programme:

Goldman, Charles; Hopper, Nicole; Bharvirkar, Ranjit; Neenan, Bernie; Cappers, Peter

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

E-Print Network 3.0 - activation expanded scope Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

usually starts at the cue... Framework for Scope Learning via Simplified Shallow Seman- tic Parsing Qiaoming Zhu Junhui Li Hongling Wang... , lijunhui, hlwang, gdzhou@suda.edu.cn...

422

Amended Notice of Intent To Modify the Scope of the EIS and Conduct...  

Broader source: Energy.gov (indexed) [DOE]

the EIS and Conduct Additional Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement for the Northern Pass Project: Federal Register Notice VOlume 78, No. 173...

423

EIS-0429: Scoping Meeting Transcript, 7/9/2012 | Department of...  

Broader source: Energy.gov (indexed) [DOE]

To Prepare the Environmental Impact Statement; Conduct Additional Public Scoping Meetings; and Issue a Notice of Floodplains and Wetlands Involvement CERTIFICATE OF AUTHENTICITY...

424

EIS-0429: Scoping Meeting Transcript, 7/10/12 | Department of...  

Broader source: Energy.gov (indexed) [DOE]

To Prepare the Environmental Impact Statement; Conduct Additional Public Scoping Meetings; and Issue a Notice of Floodplains and Wetlands Involvement CERTIFICATE OF AUTHENTICITY...

425

A SCOPING STUDY OF ADVANCED THORIUM FUEL CYCLES FOR CANDU REACTORS.  

E-Print Network [OSTI]

?? A study was conducted to scope the relative merits of various thorium fuel cycles in CANDU reactors. It was determined that, due to the (more)

Friedlander, Yonni

2011-01-01T23:59:59.000Z

426

FY 2006 Summary Table by Appropriation  

Broader source: Energy.gov (indexed) [DOE]

Appropriation Account Summary Appropriation Account Summary (dollars in thousands - OMB Scoring) FY 2004 FY 2005 FY 2006 Comparable Comparable Request to FY 2006 vs. FY 2005 Approp Approp Congress Energy And Water Development Energy Programs Energy supply....................................................................... Non-Defense site acceleration completion........................... Uranium enrichment D&D fund............................................ Non-Defense environmental services................................... Science................................................................................. Nuclear waste disposal......................................................... Departmental administration.................................................

427

2002 Fusion Summer Study Executive Summary  

E-Print Network [OSTI]

2002 Fusion Summer Study Executive Summary 31 July 2002 #12;page 2 of 15 2002 Fusion Summer Study Executive Summary The 2002 Fusion Summer Study was conducted from July 8-19, 2002, in Snowmass, CO, and carried out a critical assessment of major next-steps in the fusion energy sciences program in both

428

PRE-DESIGN INVESTIGATION SUMMARY REPORT FOR  

E-Print Network [OSTI]

Formerly Utilized Sites Remedial Action Program #12;#12;REVISION 0 PRE-DESIGN INVESTIGATION SUMMARY REPORTREVISION 0 PRE-DESIGN INVESTIGATION SUMMARY REPORT FOR COLDWATER CREEK FROM McDONNELL BOULEVARD.S. Army Corps of Engineers, St. Louis District Office, Formerly Utilized Sites Remedial Action Program

US Army Corps of Engineers

429

TEC Working Group Topic Groups Tribal Meeting Summaries | Department of  

Broader source: Energy.gov (indexed) [DOE]

Meeting Summaries Meeting Summaries TEC Working Group Topic Groups Tribal Meeting Summaries Meeting Summaries Kansas City TEC Meeting - Tribal Group Summary - July 25, 2007 Atlanta TEC Meeting - Tribal Group Summary - March 6, 2007 Green Bay TEC Meeting -- Tribal Group Summary - October 26, 2006 Washington TEC Meeting - Tribal Topic Group Summary - March 14, 2006 Pueblo TEC Meeting - Tribal Topic Group Summary, September 22, 2005 Phoenix TEC Meeting - Tribal Topic Group Summary - April 4, 2005 Albuquerque TEC Meeting - Tribal Topic Group Presentation - April 21, 2004 New Orleans TEC Meeting - Tribal Topic Group Summary - January 29, 2002 Portland TEC Meeting, Tribal Topic Group Summary - February 6, 2001 Philadelphia TEC Meeting, Tribal Topic Group Summary - July 13, 1999

430

I RADIOLOGICAL SCOPING SURVEY OF FO,RMER MONSANTO' FACILITIES  

Office of Legacy Management (LM)

-I a.d *4dk *-f--l- -I a.d *4dk *-f--l- --- I. ,e-- - .- --_ -- -. ;,. -* " . I . RADIOLOGICAL SCOPING SURVEY OF FO,RMER MONSANTO' FACILITIES (Unit XII and W a rehouse) DAYTON, OHIO Report Date: 4 September 1997 Survey Dak 27 Aitgust 1991 Prepared by: Mark L. Mays, Chief Radiation Safety Branch Sponsored by: M iamisburg Environmental Matigement Reject Office Ohio FTekl Ofice U.S.. Department of Energy Conducted by: %diation Safety Branch Of&e of Environmental Management ggtb Air Base W ing U.S. Departmtnt of the Air Force In Cooperation W ith: Southwest District Office Ohio Environmental Protection Agency - O h io Cnvironmwhl Protection Agenty Bureau of Radiological Health Ohio Department of Health. I Lb ^U .L*-u i-.-r- --- , .., II ,.--(_ ~_ -_- --- -_ _.. ;

431

ABSTRACT REQUESTER CONTRACT SCOPE OF WORK RATIONAL FOR DECISION DISPOSITION  

Broader source: Energy.gov (indexed) [DOE]

WAIVER ACTION - WAIVER ACTION - ABSTRACT REQUESTER CONTRACT SCOPE OF WORK RATIONAL FOR DECISION DISPOSITION General Motors Conduct research, development and Cost Sharing 20 percent Recommended Corporation testing of 30 KW proton-exchange- membrane (PEM) fuel cell propulsion systems 0 STATEMENT OF CONSIDERATIONS REQUEST BY GENERAL MOTORS CORPORATION FOR AN ADVANCE WAIVER OF DOMESTIC AND FOREIGN RIGHTS UNDER CONTRACT NO. DE-AC02-90CH10435, W(A)-90- 056, CH-0663 The Allison Gas Turbine Division of the General Motors Corporation (hereafter GM), a large business, has petitioned for an advance waiver of patent rights under DOE Contract No. DE-AC02- 90CH10435. The contract, yet to be definitized, resulted from an RFP issued in January 1990. As set out in the attached waiver petition, GM has requested that domestic and foreign title to

432

PIER Demand Response Research Center SCOPING STUDY ROUNDTABLE RESEARCH TARGET AREAS  

E-Print Network [OSTI]

PIER Demand Response Research Center SCOPING STUDY ROUNDTABLE ­ RESEARCH TARGET AREAS (Draft Areas #12;PIER Demand Response Research Center SCOPING STUDY ROUNDTABLE ­ RESEARCH TARGET AREAS (Draft the Value of Demand Response: Develop an Integrated Efficiency / Demand Response Framework Introduction

433

Hanford Site C Tank Farm Meeting Summary - May 2009 | Department...  

Office of Environmental Management (EM)

Hanford Site C Tank Farm Meeting Summary - May 2009 Hanford Site C Tank Farm Meeting Summary - May 2009 Meeting Summary for Development of the Hanford Site C Tank Farm Performance...

434

Forest Plan A summary of a forum explor-  

E-Print Network [OSTI]

of Natural Resources and Policy William Burch Professor of Natural Resource Management Ann Camp Lecturer YFFReview #12;Issue SummaryPage 5 | Executive Summary Executive Summary Perhaps no late 20th century

435

Department of Energy, 1977-1994, A Summary History | Department...  

Broader source: Energy.gov (indexed) [DOE]

Energy, 1977-1994, A Summary History Department of Energy, 1977-1994, A Summary History history fo the Department of Energy Department of Energy, 1977-1994, A Summary History More...

436

Energize New York Summary of Reported Data | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Summary of Reported Data Energize New York Summary of Reported Data Summary of Reported Data for Energize New York, a partner in the U.S. Department of Energy's Better Buildings...

437

Philadelphia Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Program Summary of Reported Data From July 1, 2010 - September 30, 2013 Energize New York Summary of Reported Data Better Buildings Data and Summary Report - 2014 BTO Peer Review...

438

Boulder County Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data Boulder County Summary of Reported Data Summary of Reported Data for Boulder County, a partner in the U.S. Department of Energy's Better Buildings...

439

EIS-0387: Extension of Scoping Period for the Notice of Intent To Prepare a  

Broader source: Energy.gov (indexed) [DOE]

Extension of Scoping Period for the Notice of Intent To Extension of Scoping Period for the Notice of Intent To Prepare a Site-Wide Environmental Impact Statement EIS-0387: Extension of Scoping Period for the Notice of Intent To Prepare a Site-Wide Environmental Impact Statement Y-12 National Security Complex Project, Oak Ridge, Tennessee The National Nuclear Security Administration (NNSA), an agency within the U.S. Department of Energy (DOE), is extending the scoping period for the Site-Wide Environmental Impact Statement (SWEIS) for the Y-12 National Security Complex (Y-12), located at the junction of Bear Creek Road and Scarboro Road in Anderson County, Tennessee, near the City of Oak Ridge, Tennessee. National Nuclear Security Administration Extension of Scoping Period for the Notice of Intent To Prepare a Site-Wide Environmental Impact Statement,

440

EA-1903: Notice of Scoping of an Environmental Assessment | Department of  

Broader source: Energy.gov (indexed) [DOE]

Scoping of an Environmental Assessment Scoping of an Environmental Assessment EA-1903: Notice of Scoping of an Environmental Assessment Kansas State University (KSU) Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office is requesting public input on the scope of environmental issues and alternatives that will be addressed in the in the KSU Zond Wind Energy Project EA. In this EA, DOE will evaluate the potential environmental impacts of a proposal to authorize the expenditure of federal funding to KSU to reburbish, install, operate, and maintain a 750-kilowatt Zond wind turbine on KSU property north of Manhattan, Kansas. EA-1903-NoticeofScoping-2012.pdf More Documents & Publications EA-1903: Notice of Availability of Draft Environmental Assessment EA-1903: Notice of Extension

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Step 5. Determine Crucial Components of the Energy Code: Scope and  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5. Determine Crucial Components of the Energy Code: Scope and 5. Determine Crucial Components of the Energy Code: Scope and Applicability, Format, Adoption Date, and Effective Date Description There are four crucial components that must be considered during the adoption process: scope and applicability, format, adoption date and effective date. The scope of a code dictates which requirements will be covered by the code while the format relates to the manner in which code requirements are presented. Based on the energy goals of a state or jurisdiction, the scope and format of a code will greatly influence which code is selected for adoption and the adoption process used. For example, if a jurisdiction wishes to include only the HVAC system in its local code, a national model code may be amended to reflect these changes or a locally

442

News Release: DOE to Host Public Scoping Meetings on Uranium Leasing PEIS |  

Broader source: Energy.gov (indexed) [DOE]

DOE to Host Public Scoping Meetings on Uranium DOE to Host Public Scoping Meetings on Uranium Leasing PEIS News Release: DOE to Host Public Scoping Meetings on Uranium Leasing PEIS July 29, 2011 - 2:53pm Addthis News Contact: DOE, Laura Kilpatrick Esq., Realty Officer (720) 880-4338 Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs (720) 377-9672 GRAND JUNCTION, Colo. - The U.S. Department of Energy is hosting public scoping meetings to invite comments on the scope of the Draft Uranium Leasing Program Programmatic Environmental Impact Statement. The meetings will be held at the locations and dates listed below and will begin at 6:30 p.m. with an opportunity to sign-in to provide oral comments. A formal presentation by DOE officials will start at 7:00 p.m. followed by public comments starting at 7:15 p.m.

443

EIS-0183: Notice of Extension of Scoping Period | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Extension of Scoping Period Extension of Scoping Period EIS-0183: Notice of Extension of Scoping Period Administration-Construction, Operation, and Maintenance of the Proposed Transmission Agency of Northern California Transmission Project, California On February 23, 2009, Western Area Power Administration (Western), an agency of the Department of Energy (DOE), announced the Notice of Intent to prepare an Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the construction, operation, and maintenance of the proposed Transmission Agency of Northern California (TANC) Transmission Project. In that notice, Western described the schedule for scoping meetings and advised the public that comments on the scope of the EIS/EIR were due by April 30, 2009. DOE/EIS-0183, Western Area Power Administration-Construction, Operation,

444

EIS-0183: Notice of Extension of Scoping Period | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Notice of Extension of Scoping Period Notice of Extension of Scoping Period EIS-0183: Notice of Extension of Scoping Period Administration-Construction, Operation, and Maintenance of the Proposed Transmission Agency of Northern California Transmission Project, California On February 23, 2009, Western Area Power Administration (Western), an agency of the Department of Energy (DOE), announced the Notice of Intent to prepare an Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the construction, operation, and maintenance of the proposed Transmission Agency of Northern California (TANC) Transmission Project. In that notice, Western described the schedule for scoping meetings and advised the public that comments on the scope of the EIS/EIR were due by April 30, 2009. DOE/EIS-0183, Western Area Power Administration-Construction, Operation,

445

EIS-0466: Re-opening of Public Scoping Period and Announcement of  

Broader source: Energy.gov (indexed) [DOE]

Re-opening of Public Scoping Period and Announcement of Re-opening of Public Scoping Period and Announcement of Additional Public Scoping Meetings EIS-0466: Re-opening of Public Scoping Period and Announcement of Additional Public Scoping Meetings Continued Operation of the Sandia National Laboratories, New Mexico Comment Period Ends: 9/12/2011 Submit Comments to: Ms. Jeanette Norte NNSA Sandia Site Office P.O. Box 5400 Albuquerque, NM 87185-5400 Telephone: 505-845-4808 Toll-free: 1-855-766-4651 Fax: 505-284-7197 Electronic mail: sandia.sweis@doeal.gov On June 24, 2011, the National Nuclear Security Administration (NNSA), a semiautonomous agency within the U.S. Department of Energy (DOE), published a Notice of Intent (NOI) for the preparation of a Site-Wide Environmental Impact Statement (SWEIS) for the Sandia National Laboratories, New Mexico

446

EIS-0396: Notice of Extension of Time to Submit Scoping Comments |  

Broader source: Energy.gov (indexed) [DOE]

Extension of Time to Submit Scoping Comments Extension of Time to Submit Scoping Comments EIS-0396: Notice of Extension of Time to Submit Scoping Comments Global Nuclear Energy Partnership In response to public requests, the Department of Energy (DOE) announces an extension of time to submit comments on the proposed scope, alternatives, and environmental issues to be analyzed in the Programmatic Environmental Impact Statement for the Global Nuclear Energy Partnership (GNEP PEIS). Notice of Extension of Time to Submit Scoping Comments on the Programmatic Environmental Impact Statement for the Global Nuclear Energy Partnership, DOE/EIS-0396 (April 2007) 72 FR 15871 More Documents & Publications EIS-0359: DOE Notice of Availability of the Draft Supplement Analysis EIS-0360: DOE Notice of Availability of the Draft Supplement Analysis

447

The U.S. Department of Energy is reopening the public scoping period for  

Broader source: Energy.gov (indexed) [DOE]

The U.S. Department of Energy is reopening the public scoping The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS). The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS). June 15, 2011 - 2:35pm Addthis The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS). Addthis Related Articles Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Obama Officials Announce Steps to Promote the Clean Energy Potential of the West DOE Environmental Impact Statement Public Scoping Meeting on Champlain

448

1982 geothermal well drilling summary  

SciTech Connect (OSTI)

This summary lists all geothermal wells spudded in 1982, which were drilled to a depth of at least 2,000 feet. Tables 1 and 2 list the drilling information by area, operator, and well type. For a tabulation of all 1982 geothermal drilling activity, including holes less than 2,000 feet deep, readers are referred to the February 11, 1983, issue of Petroleum Information's ''National Geothermal Service.'' The number of geothermal wells drilled in 1982 to 2,000 feet or more decreased to 76 wells from 99 ''deep'' wells in 1981. Accordingly, the total 1982 footage drilled was 559,110 feet of hole, as compared to 676,127 feet in 1981. Most of the ''deep'' wells (49) completed were drilled for development purposes, mainly in The Geysers area of California. Ten field extension wells were drilled, of which nine were successful. Only six wildcat wells were drilled compared to 13 in 1980 and 20 in 1981, showing a slackening of exploration compared to earlier years. Geothermal drilling activity specifically for direct use projects also decreased from 1981 to 1982, probably because of the drastic reduction in government funding and the decrease in the price of oil. Geothermal power generation in 1982 was highlighted by (a) an increase of 110 Mw geothermal power produced at The Geysers (to a total of 1,019 Mw) by addition of Unit 17, and (b) by the start-up of the Salton Sea 10 Mw single flash power plant in the Imperial Valley, which brought the total geothermal electricity generation in this area to 31 Mw.

Parmentier, P.P.

1983-08-01T23:59:59.000Z

449

Alternative Neutron Detection Testing Summary  

SciTech Connect (OSTI)

Radiation portal monitors used for interdiction of illicit materials at borders include highly sensitive neutron detection systems. The main reason for having neutron detection capability is to detect fission neutrons from plutonium. Most currently deployed radiation portal monitors (RPMs) use neutron detectors based upon 3He-filled gas proportional counters, which are the most common large area neutron detector. This type of neutron detector is used in the TSA and other RPMs installed in international locations and in the Ludlum and Science Applications International Corporation RPMs deployed primarily for domestic applications. There is a declining supply of 3He in the world and, thus, methods to reduce the use of this gas in RPMs with minimal changes to the current system designs and sensitivity to cargo-borne neutrons are being investigated. Four technologies have been identified as being currently commercially available, potential alternative neutron detectors to replace the use of 3He in RPMs. These technologies are: 1) Boron trifluoride-filled proportional counters, 2) Boron-lined proportional counters, 3) Lithium-loaded glass fibers, and 4) Coated wavelength-shifting plastic fibers. Reported here is a summary of the testing carried out at Pacific Northwest National Laboratory on these technologies to date, as well as measurements on 3He tubes at various pressures. Details on these measurements are available in the referenced reports. Sponsors of these tests include the Department of Energy (DOE), Department of Homeland Security (DHS), and the Department of Defense (DoD), as well as internal Pacific Northwest National Laboratory funds.

Kouzes, Richard T.; Ely, James H.; Erikson, Luke E.; Kernan, Warnick J.; Lintereur, Azaree T.; Siciliano, Edward R.; Stromswold, David C.; Woodring, Mitchell L.

2010-04-08T23:59:59.000Z

450

Renewable, Low-Cost Carbon Fiber for Lightweight Vehicles: Summary...  

Broader source: Energy.gov (indexed) [DOE]

Renewable, Low-Cost Carbon Fiber for Lightweight Vehicles: Summary Report Renewable, Low-Cost Carbon Fiber for Lightweight Vehicles: Summary Report This report outlines the final...

451

Smart Grid Privacy Workshop Summary Report (January 2012) | Department...  

Energy Savers [EERE]

Smart Grid Privacy Workshop Summary Report (January 2012) Smart Grid Privacy Workshop Summary Report (January 2012) As smart grid deployments have increased throughout the United...

452

Design Case Summary: Production of Mixed Alcohols from Municipal...  

Office of Environmental Management (EM)

Design Case Summary: Production of Mixed Alcohols from Municipal Solid Waste via Gasification Design Case Summary: Production of Mixed Alcohols from Municipal Solid Waste via...

453

TEC Meeting Summaries - September 2005 | Department of Energy  

Office of Environmental Management (EM)

September 2005 TEC Meeting Summaries - September 2005 Pueblo, Colorado (September 2005) Meeting Summaries Presentations Items Available for Download Agenda Participants List TEC...

454

Hanford Site C Tank Farm Meeting Summary - February 2009 | Department...  

Office of Environmental Management (EM)

February 2009 Hanford Site C Tank Farm Meeting Summary - February 2009 Meeting Summary for Development of the Hanford Site C Tank Farm Performance Assessment Hanford Site C Tank...

455

OAHU Wind Integration And Transmission Study: Summary Report...  

Office of Environmental Management (EM)

OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory) OAHU Wind Integration And Transmission Study: Summary Report, NREL...

456

2012 Annual Planning Summary for Nuclear Energy | Department...  

Broader source: Energy.gov (indexed) [DOE]

APS-2012-NE.xls More Documents & Publications 2014 Annual Planning Summary for the West Valley Demonstration Project 2012 Annual Planning Summary for National Nuclear Security...

457

2012 Annual Planning Summary for Nevada Site Office | Department...  

Broader source: Energy.gov (indexed) [DOE]

APS-2012-NSO.xls More Documents & Publications 2014 Annual Planning Summary for the West Valley Demonstration Project 2012 Annual Planning Summary for Loan Program Office 2012...

458

Neutron Irradiation of Hydrided Cladding Material in HFIR Summary...  

Broader source: Energy.gov (indexed) [DOE]

Neutron Irradiation of Hydrided Cladding Material in HFIR Summary of Initial Activities Neutron Irradiation of Hydrided Cladding Material in HFIR Summary of Initial Activities...

459

2013 Annual Planning Summary for the Oak Ridge Office | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Annual Planning Summary for the Oak Ridge Office 2013 Annual Planning Summary for the Oak Ridge Office The ongoing and projected Environmental Assessments and Environmental...

460

2014 Annual Planning Summary for the Oak RIdge National Laboratory...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

4 Annual Planning Summary for the Oak RIdge National Laboratory Site Office 2014 Annual Planning Summary for the Oak RIdge National Laboratory Site Office The Oak Ridge National...

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Microsoft Word - FINAL_PIC_Apr2007_summary.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4, 2007 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE MEETING April 4, 2007 Clackamas, OR Topics in this Meeting Summary Welcome and...

462

Microsoft Word - FINAL_PIC_Sept2008_summary.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3, 2008 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE MEETING September 3, 2008 Seattle, WA Topics in this Meeting Summary Welcome and...

463

2012_0411_PIC_Meeting_Summary_v1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 11, 2012 FINAL MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT & COMMUNICATIONS COMMITTEE MEETING April 11, 2012 Kennewick, WA Topics in this Meeting Summary...

464

2012_0411_PIC_Meeting_Summary_v1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft Meeting Summary October 31, 2012 DRAFT MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT & COMMUNICATIONS COMMITTEE MEETING October 31, 2012 Richland, WA Topics in...

465

Biogas and Fuel Cells Workshop Summary Report: Proceedings from...  

Broader source: Energy.gov (indexed) [DOE]

and Fuel Cells Workshop Summary Report: Proceedings from the Biogas and Fuel Cells Workshop, Golden, Colorado, June 11-13, 2012 Biogas and Fuel Cells Workshop Summary Report:...

466

2011 Residential Energy Efficiency Technical Update Meeting Summary...  

Energy Savers [EERE]

2011 Residential Energy Efficiency Technical Update Meeting Summary Report: Denver, Colorado - August 9-11, 2011 2011 Residential Energy Efficiency Technical Update Meeting Summary...

467

TEC Meeting Summaries - September 2006 | Department of Energy  

Office of Environmental Management (EM)

September 2006 TEC Meeting Summaries - September 2006 Green Bay, Wisconsin (September 2006) Meeting Summaries Items Available for Download Agenda Participants List TEC Meeting...

468

File:(PECC) Special Program on Climate Change SUMMARY (english...  

Open Energy Info (EERE)

PECC) Special Program on Climate Change SUMMARY (english).pdf Jump to: navigation, search File File history File usage File:(PECC) Special Program on Climate Change SUMMARY...

469

2011 Annual Planning Summary for Environmental Management (EM...  

Energy Savers [EERE]

(EM) More Documents & Publications 2012 Annual Planning Summary for Bonneville Power Administration 2014 Annual Planning Summary for the West Valley Demonstration Project...

470

2011 ANNUAL PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS AGENCY WESTERN AREA POWER ADMINISTRATION 2011 ANNUAL PLANNING SUMMARY FOR ADVANCED RESEARCH AND PROJECTS AGENCY WESTERN...

471

2013 Annual Planning Summary for the Savannah River Operations...  

Office of Environmental Management (EM)

for Savannah River Operations Office 2010 Annual Planning Summary for Savannah River Operations Office (SRS) 2012 Annual Planning Summary for Bonneville Power Administration...

472

Summary Pamphlet, Nuclear Safety at the Department of Energy...  

Office of Environmental Management (EM)

Summary Pamphlet, Nuclear Safety at the Department of Energy Summary Pamphlet, Nuclear Safety at the Department of Energy September 2010 This pamphlet is developed as part of the...

473

Summary, Long-Term Nuclear Technology Research and Development...  

Broader source: Energy.gov (indexed) [DOE]

Summary, Long-Term Nuclear Technology Research and Development Plan Summary, Long-Term Nuclear Technology Research and Development Plan In 1998, DOE established the Nuclear Energy...

474

Design Case Summary: Production of Gasoline and Diesel from Biomass...  

Energy Savers [EERE]

Design Case Summary: Production of Gasoline and Diesel from Biomass via Fast Pyrolysis, Hydrotreating, and Hydrocracking Design Case Summary: Production of Gasoline and Diesel from...

475

2010 Annual Planning Summary for Civilian Radioactive Waste Management...  

Broader source: Energy.gov (indexed) [DOE]

Civilian Radioactive Waste Management (CRWM) 2010 Annual Planning Summary for Civilian Radioactive Waste Management (CRWM) Annual Planning Summaries briefly describe the status of...

476

ENERGY STAR Appliance Verification Testing - Pilot Program Summary...  

Broader source: Energy.gov (indexed) [DOE]

Appliance Verification Testing - Pilot Program Summary Report dated February 3, 2012 ENERGY STAR Appliance Verification Testing - Pilot Program Summary Report dated February 3,...

477

Independent Oversight Inspection, Nevada Test Site, Summary Report...  

Broader source: Energy.gov (indexed) [DOE]

Summary Report - October 2002 Independent Oversight Inspection, Nevada Test Site, Summary Report - October 2002 October 2002 Inspection of Environment, Safety, and Health and...

478

Summary of Test Results for the Interagency Field Test &Evaluation...  

Broader source: Energy.gov (indexed) [DOE]

Summary of Test Results for the Interagency Field Test &Evaluation of Wind Turbine - Radar Interference Mitigation Technologies Summary of Test Results for the Interagency Field...

479

TEC Meeting Summaries - July 1993 | Department of Energy  

Office of Environmental Management (EM)

July 1993 TEC Meeting Summaries - July 1993 Chicago, Illinois (July 20-23, 1993) Meeting Summaries Items Available for Download TEC Meeting Notes More Documents & Publications TEC...

480

Y-12 National Security Complex Technology Marketing Summaries...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Y-12 National Security Complex Technology Marketing Summaries Here you'll find marketing summaries for technologies available for licensing from the Y-12 National Security Complex...

Note: This page contains sample records for the topic "ffcact scope summary" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

2007 Annual Site Environmental Report Summary Pamphlet 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Annual Site Environmental Report Summary Pamphlet 1 2007 ASER SUMMARY PAMPHLET annual site environmental report Sandia National Laboratories, New Mexico Sandia is a multi-program...

482

SPACE UTILIZATION STUDY -EXECUTIVE SUMMARY SCHOOL OF MEDICINE & HEALTH SCIENCES  

E-Print Network [OSTI]

SPACE UTILIZATION STUDY - EXECUTIVE SUMMARY SCHOOL OF MEDICINE & HEALTH SCIENCES UNIVERSITY School of Medicine & Health Sciences - Space Utilization Study Grand Forks, ND EXECUTIVE SUMMARY SUITAb utilities. · Lackofnaturallight

Delene, David J.

483

Summary Report from Theory Focus Session on Hydrogen Storage...  

Broader source: Energy.gov (indexed) [DOE]

Summary Report from Theory Focus Session on Hydrogen Storage Materials Summary Report from Theory Focus Session on Hydrogen Storage Materials This report provides information about...

484

June 2014 Electricity Advisory Committee Meeting Summaries and...  

Broader source: Energy.gov (indexed) [DOE]

June 2014 Electricity Advisory Committee Meeting Summaries and Transcripts Now Available June 2014 Electricity Advisory Committee Meeting Summaries and Transcripts Now Available...

485

FINAL MEETING SUMMARY HANFORD ADVISORY BOARD RIVER AND PLATEAU...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and suggested the committee postpone approval of the summary to allow more time for review. The committee agreed to adopt the December and January meeting summaries at the...

486

Briefing: Summary and Recommendations of EM Landfill Workshop...  

Office of Environmental Management (EM)

Briefing: Summary and Recommendations of EM Landfill Workshop Briefing: Summary and Recommendations of EM Landfill Workshop The briefing is an independent technical review report...

487

Better Buildings Neighborhood Program Summary of Reported Data...  

Broader source: Energy.gov (indexed) [DOE]

Summary of Reported Data From July 1, 2010 - September 30, 2013 Better Buildings Neighborhood Program Summary of Reported Data From July 1, 2010 - September 30, 2013 Better...

488

Nuclear Safety Workshop Summary | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Workshop Summary Workshop Summary Nuclear Safety Workshop Summary September 19-20, 2012 Nuclear Safety Workshop Summary On September 19-20, 2012, the U.S. Department of Energy (DOE) held a second Nuclear Safety Workshop covering the results of the Department's actions to improve its posture for analyzing and responding to severe accidents in light of lessons learned from the March 2011 nuclear accident in Japan. Sponsored by DOE and championed by Deputy Secretary of Energy Daniel Poneman, the two-day workshop discussed the lessons learned in a national and international context. The workshop's theme was Post Fukushima Initiatives and Results, and included technical breakout sessions focused on beyond design basis events (BDBEs) analysis and response, safety culture, and risk assessment and management.

489

Summary Report on Federal Laboratory Technology Transfer  

E-Print Network [OSTI]

Summary Report on Federal Laboratory Technology Transfer Agency Approaches; FY 2001 Activity Metrics and Outcomes 2002 Report to the President and the Congress under the Technology Transfer: FEDERAL LAB TECHNOLOGY TRANSFER TABLE OF CONTENTS LIST OF FIGURES AND TABLES

Perkins, Richard A.

490

Annual Fire Protection Summary Information Reporting Guide  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) Annual Fire Protection Program Summary continues the series started in 1972. The report annually summarizes monetary loss information sent to Headquarters by reporting elements.

491

A summary of demersal fish tagging data  

E-Print Network [OSTI]

Report no.135 G. Burt, D. Goldsmith and M. Armstrong #12;#12;A summary of demersal fish tagging data. Armstrong August 2006 #12;This report should be cited as: Burt, G., Goldsmith, D. and Armstrong, M., 2006

492

Cornell's Urban Sustainability Initiatives ACSF Lunch Summary  

E-Print Network [OSTI]

Sustainability Initiatives lunch. After introductions of participants, Josh Cerra (Landscape Architecture) gave sustainability initiatives conducted in cooperation with Landscape Architecture in the ethnically diverseCornell's Urban Sustainability Initiatives ACSF Lunch Summary Compiled by Marianne Krasny (NTRES

Angenent, Lars T.

493

UNIVERSITY OF SASKATCHEWAN Strategic Research Plan Summary  

E-Print Network [OSTI]

UNIVERSITY OF SASKATCHEWAN Strategic Research Plan Summary Canada ResearchChairs Program, Canada provinceofSaskatchewan,inits academic programs and the qualityof the learning environment of Saskatchewan has established an international reputation for achievement in a diversity of disciplines

Patterson, William P.

494

(4/28/14) SUMMARY OF MODIFICATIONS  

E-Print Network [OSTI]

(4/28/14) SUMMARY OF MODIFICATIONS FACULTY HANDBOOK SECTION 8 PROMOTION AND TENURE Subject Description Relevant Handbook Sections Allow for delay the application and review procedures set forth in this section of the Handbook. The tenure track refers

495

(5/1/14) SUMMARY OF MODIFICATIONS  

E-Print Network [OSTI]

(5/1/14) SUMMARY OF MODIFICATIONS FACULTY HANDBOOK SECTION 12 UNIVERSITY COMMITTEES Subject Description Relevant Handbook Sections Safety Committee COMMITTEES For the purposes of this Handbook section only, the term "academic faculty" shall include all

496

Research Summary Key Ingredients of Collaborative Management  

E-Print Network [OSTI]

, wildlife management and water catchments. This project, developed in discussion with stakeholders, soughtResearch Summary Key Ingredients of Collaborative Management It is widely accepted that collaboration amongst stakeholders can lead to more sustainable land-management. Voluntary collaboration

497

ARRA Program Summary: Energy Smart Jobs Program  

E-Print Network [OSTI]

ARRA Program Summary: Energy Smart Jobs Program Statewide Program (Initially targeting urban Description: The Program focuses on both job creation and energy efficiency. Just over one third, utilities and customers to ensure both job creation and energy efficiency opportunities continue

498

SUMMARY OF MATERIAL MODIFICATIONS FOR BOARD APPROVAL  

E-Print Network [OSTI]

SUMMARY OF MATERIAL MODIFICATIONS FOR BOARD APPROVAL FACULTY HANDBOOK Subject Description Relevant Handbook Sections Material Changes Change of Locus. Vacation benefit does not roll from year to year becoming a "use it or lose

499

(3/13/14) SUMMARY OF MODIFICATIONS  

E-Print Network [OSTI]

(3/13/14) SUMMARY OF MODIFICATIONS FACULTY HANDBOOK SECTION 5 RIGHTS, PRIVILEGES, AND BENEFITS Subject Description Relevant Handbook Sections Define class to at most two weeks per year. Vacation benefit does not roll from year to year

500

DOE/NV/26383-LTR2008-01 Letter Report Yucca Mountain Environmental Monitoring Systems Initiative - Air Quality Scoping Study for Caliente, Lincoln County, Nevada  

SciTech Connect (OSTI)

The Desert Research Institute (DRI) is performing a scoping study as part of the U.S. Department of Energy's Yucca Mountain Environmental Monitoring Systems Initiative (EMSI). The main objective is to obtain baseline air quality information for Yucca Mountain and an area surrounding the Nevada Test Site (NTS). Air quality and meteorological monitoring and sampling equipment housed in a mobile trailer (shelter) is collecting data at eight sites outside the NTS, including Ash Meadows National Wildlife Refuge (NWR), Beatty, Sarcobatus Flats, Rachel, Caliente, Pahranagat NWR, Crater Flat, and Tonopah Airport, and at four sites on the NTS (Engelbrecht et al., 2007a-d). The trailer is stationed at any one site for approximately eight weeks at a time. This letter report provides a summary of air quality and meteorological data, on completion of the site's sampling program.

J. Engelbrecht; I. Kavouras; D. Campbell; S. Campbell; S. Kohl; D. Shafer

2009-04-02T23:59:59.000Z