Powered by Deep Web Technologies
Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S-1 Summary This summary covers the major points of the draft environmental impact statement (DEIS) prepared for the Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project (Libby-Troy Project). This DEIS was prepared by Bonneville Power Administration (BPA). The project would include rebuilding a 17-mile section of an existing BPA transmission line located between Libby and Troy, Montana. S.1 Purpose of and Need for Action Historically, BPA has served electrical loads in northwestern Montana and northern Idaho with transmission facilities from Libby Dam east of Libby, Montana through Bonners Ferry Substation west of Bonners Ferry, Idaho to Albeni Falls Dam near the Idaho-Washington border (Figure S-1). These

2

Notice of Intent for the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line (DOE/EIS-0379) (05/05/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56 56 Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices Angeles to change between direct current and alternating current. This proposed converter station would be located in the vicinity of BPA's Port Angeles Substation in Clallam County, Washington, and would occupy from one to two acres. OC has proposed that the converter station be sited within the existing boundary of the Port Angeles Substation on property leased or otherwise transferred from BPA to OC. OC has proposed to begin construction of the HVDC transmission line and converter station by June 2006. Under this schedule, the HVDC system would be interconnected to the FCRTS in the fall of 2007, with a proposed operation date of December 2007. Once constructed, all existing land use and

3

Western Area Power Administration Flatiron-Erie 115-kilovolt Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65 65 Federal Register / Vol. 60, No. 161 / Monday, August 21, 1995 / Notices biomedical technology, and computational biology. One of the components of these programs deals with correctly assessing the dose to various systems that are exposed to radiation fields during treatment. These systems could range from biomolecules to different tissues and organs. The exposure to both patients and health care providers results from such sources as neutrons, high LET radiation, and low LET radiation such as electrons, x- rays, and gamma rays. In many situations, radiation could be combinations of the various radiation fields listed above. For example, development of improved methods for determination of dose to normal vs. cancerous tissue, and of strategies for maximizing the dose to cancerous tissue

4

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project http:energy.govnepadownloadseis-0379-epa-notice-availabilit...

5

Montana | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line, Libby, Lincoln County, Montana February 15, 2008 EIS-0399: EPA Notice...

6

Microsoft Word - Libby Troy FEIS TAC Master 5-7-08.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuild of the Libby (FEC) to Troy Section of Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement Bonneville Power Administration May 2008 Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA); U. S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project, DOE/EIS - 0379 State Involved: Montana Abstract: The Libby-Troy transmission line, which is the 17-mile section of the 115-kilovolt (kV) transmission line that extends

7

DOE/EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

8

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

9

EIS-0379: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, Rebuilding Transmission Line between Libby and Troy, Lincoln County, Montana DOE/EIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, 72 FR 39808 (July 2007) More Documents & Publications EIS-0394: EPA Notice of Availability of the Draft Environmental Impact

10

EIS-0379: EPA Notice of Availability of the Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: EPA Notice of Availability of the Draft Environmental 79: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, Rebuilding Transmission Line between Libby and Troy, Lincoln County, Montana DOE/EIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, 72 FR 39808 (July 2007) More Documents & Publications EIS-0464: EPA Notice of Availability of Final Environmental Impact

11

Microsoft Word - Central Ferry-Lower Monumental ROD.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Record of Decision March 2011 Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Record of Decision March 2011 Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Central Ferry-Lower Monumental 500-kilovolt (kV) Transmission Line Project in Garfield, Columbia, and Walla Walla counties, Washington. BPA has decided to implement the Combination A Alternative identified in the Central Ferry-Lower Monumental 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0422, February 2011). The Combination A Alternative consists of constructing a new 500-kV transmission line from BPA's new Central Ferry Substation near the Port of Central Ferry in Garfield County generally west

12

Libby-Troy Line Rebuild Project - July 25, 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

13

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

14

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana Summary This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy

15

Alabama Nuclear Profile - Browns Ferry  

U.S. Energy Information Administration (EIA) Indexed Site

Browns Ferry" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

16

Natural gas ferries in Norway.  

E-Print Network (OSTI)

??This paper studies the emergence of natural gas powered ferries in Norway and their diffusion as a means to reaching the goals of reducing NOx… (more)

Myklebust, Benjamin

2006-01-01T23:59:59.000Z

17

Ferry Barge | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Ferry Barge Ferry Barge Before the Manhattan Project, modern bridges were very far into the future for the Oak Ridge area. They came more quickly with the project....

18

El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment  

SciTech Connect

This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

Not Available

1992-04-01T23:59:59.000Z

19

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

20

City of Bonners Ferry, Idaho (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Bonners Ferry, Idaho (Utility Company) Bonners Ferry, Idaho (Utility Company) Jump to: navigation, search Name City of Bonners Ferry Place Idaho Utility Id 1956 Utility Location Yes Ownership M NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Interdepartmental with Demand: B1PI Industrial Interdepartmental with Demand: B1PO Industrial Interdepartmental with Demand: B3PI Industrial Interdepartmental with Demand: B3PO Industrial Interdepartmental: S1PI Commercial

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EIS-0379: Notice of Intent to Prepare an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Notice of Intent to Prepare an Environmental Impact : Notice of Intent to Prepare an Environmental Impact Statement EIS-0379: Notice of Intent to Prepare an Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line, Libby, Lincoln County, Montana BPA intends to prepare an EIS on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. DOE/EIS-0379, Bonneville Power Administration, Notice of Intent to prepare

22

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO  

Energy.gov (U.S. Department of Energy (DOE))

DOE’s Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support its decision on whether to grant a Special Use Permit for parts of the transmission line located on National Forest lands.

23

Pages that link to "Bonners Ferry, Idaho" | Open Energy Information  

Open Energy Info (EERE)

Share this page on Facebook icon Twitter icon Pages that link to "Bonners Ferry, Idaho" Bonners Ferry, Idaho Jump to: navigation, search What links here Page: Bonners...

24

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

25

Paynes Ferry Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Paynes Ferry Wind Farm Paynes Ferry Wind Farm Jump to: navigation, search Name Paynes Ferry Wind Farm Facility Paynes Ferry Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Exergy Developer Exergy Energy Purchaser Idaho Power Location Twin Falls County ID Coordinates 42.743987°, -114.929464° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.743987,"lon":-114.929464,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

26

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A N U A R Y 2 0 0 1 A N U A R Y 2 0 0 1 SHELTON-KITSAP TRANSMISSION LINE REBUILD Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1342 DEPARTMENT OF ENERGY Bonneville Power Administration Shelton-Kitsap Transmission Line Rebuild Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings. Summary: This notice announces Bonneville Power Administration's (BPA) proposal to rebuild its existing Shelton-Kitsap No. 2 115-kilovolt (kV) transmission line as a double-circuit 230-kV line in the existing right-of-way, in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1342) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major

27

Microsoft Word - CX_FINAL_Sale_of_Eight_Spans_Tanner_Tap_115-kV_Transmission_Line_to_PSE_6-5-2012_.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan B. Kendall Project Manager -TERR-3 Proposed Action: Sale of Line Mile 1 of the 115-kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B 1.24. Property Transfer Location: King County, Washington; Township 24 North, Range 7 East, Section 36, Willamette Meridian Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to sell to Puget Sound Energy (PSE) the first eight spans of its 115-kV Tanner Tap to Snoqualmie-Lake Tradition #1 transmission line (Tanner Tap-8). Tanner Tap-8, built in 2002, is owned and operated by BPA and located within a 150 feet

28

Browns Ferry Corrosion Failure Data Assessment  

Science Conference Proceedings (OSTI)

This report provides a summary of the poolside inspection results from an inspection performed in 2011 of GE6 8x8 fuel that operated in Browns Ferry-3 and failed as a result of a corrosion-related mechanism in cycle 8 in 1998. It also provides an assessment of these results relative to prior crud-induced localized corrosion– (CILC-) type failures in the early 1980s and subsequent corrosion-related failures from 2002 to 2004 in the same unit and its sister unit Browns Ferry-2. In particular, ...

2012-09-27T23:59:59.000Z

29

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 260 of 6,577 results. Download CX-005936: Categorical Exclusion Determination Erie to Terry Street and Lyons to Longmont Northwest 115 Kilovolt Transmission Line Structure...

30

CX-010438: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chenoweth Goldendale Number 1, 115-kilovolt transmission line adjacent to the Bonneville Power Administration Goldendale Substation." CX-010438.pdf More Documents & Publications...

31

CX-008693: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Categorical Exclusion Determination CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission...

32

CX-006580: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination CX-006580: Categorical Exclusion Determination Wood Pole Replacement Along the Grand Coulee-Okanogan 2 115-Kilovolt Transmission Line CX(s)...

33

EIS-0285-SA-136: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Vegetation Management for the Oregon City-Chemawa 1 and 2 115 kilovolt transmission lines from Oregon City Substation to Chemawa Substation. BPA proposes to...

34

Preliminary Draft EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement January 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement Bonneville Power Administration January 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany-

35

Microsoft Word - Central Ferry Fiber Project CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2011 7, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum Glen Van Bergen - TEP-TPP-3 Proposed Action: Central Ferry Fiber Project Budget Information: Work Order # 00223131, Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment." B4.7 "Adding fiber optic cable to transmission structures..." Location: Walla Walla, Columbia, and Garfield counties, WA ï‚· Township 12 North, Range 34 East, Section 3 ï‚· Township 13 North, Range 38 East, Sections 28, 33-36 ï‚· Township 13 North, Range 39 East, Sections 25-29. 31-33 ï‚· Township 13 North, Range 40 East, Sections 11, 12, 14-16, 20, 21, 29, 30

36

Lynch Ferry Hatchery - Summer Steelhead, Final Report  

DOE Green Energy (OSTI)

This report presents the findings of the independent audit of the Lyons Ferry Hatchery (Summer Steelhead). Lyons Ferry Hatchery is located downstream of the confluence of the Palouse and Snake rivers, about 7 miles west of Starbuck, Washington. The hatchery is used for adult collection of fall chinook and summer steelhead, egg incubation of fall chinook, spring chinook, steelhead, and rainbow trout and rearing of fall chinook, spring chinook, summer steelhead, and rainbow trout. The audit was conducted in April 1996 as part of a two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the US Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife.

Watson, M.

1996-05-01T23:59:59.000Z

37

Bonners Ferry, Idaho: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

with form History Share this page on Facebook icon Twitter icon Bonners Ferry, Idaho: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates...

38

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

39

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement March 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement Bonneville Power Administration March 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: The Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany- Eugene 115-kilovolt No. 1 Transmission Line. This line extends from the Albany Substation in the City of

40

Some comments on John Ferry's most enduring paper  

E-Print Network (OSTI)

lab at the University of Wisconsin. The timely appearance ofDepartment of Chemistry at Wisconsin from 1959 to 1967), andWhen Ferry moved to Wisconsin, he continued the double-

Doolittle, Russell F.

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Assessment of Browns Ferry 2 Cycle 12 Fuel Corrosion Failures  

Science Conference Proceedings (OSTI)

Boiling water reactor (BWR) fuel rods from 63 bundles of the Reload 10 GE13 (9x9) design developed leaks during Cycle 12 at Browns Ferry 2 (BF-2). Corrosion failures also occurred in Browns Ferry 3 (BF-3) and Vermont Yankee (VY) in a similar time frame. These fuel failures were investigated in the spent fuel pool and in two separate hot cell examination campaigns. This report compiles and assesses the significant findings of the root cause investigation.

2011-11-30T23:59:59.000Z

42

Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

43

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

1994-02-01T23:59:59.000Z

44

Microsoft Word - CX-Libby-Troy-AR-Revised-FY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Dave Forward Road Designer - TELF-TPP-3 Proposed Action: Libby-Troy Access Road Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine Maintenance Location: Lincoln County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Upgrade and improve access roads from Structures 23/3 through 24/6 on the Libby-Troy section of the Libby-Bonners Ferry No. 1 115-kilovolt (kV) transmission line. Background This project entails improving the several existing access roads along the Libby-Troy section of the Libby-Bonners Ferry No. 1 115-kV transmission line. Action locations for project access and road repair activities will include:

45

Microsoft Word - CX-Colville-Republic-Maintenance-FY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFSF-Bell Proposed Action: Routine maintenance on the Colville-Republic No. 1 transmission line PP&A Project No.: 2,139 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Ferry and Stevens counties, Washington; Bonneville Power Administration's (BPA) Bell District Proposed by: BPA Description of the Proposed Action: BPA proposes to replace deteriorating wood pole towers and associated components (e.g. cross arms, insulators, guy anchors, etc.) along its Colville- Republic No. 1, 115-kilovolt transmission line in Ferry and Stevens counties, Washington. This

46

PUD No 1 of Ferry County | Open Energy Information  

Open Energy Info (EERE)

Ferry County Ferry County Jump to: navigation, search Name PUD No 1 of Ferry County Place Washington Utility Id 6297 Utility Location Yes Ownership P NERC WECC Yes ISO Other Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service Schedule 200 Single Phase Commercial General Service Schedule 200 Three Phase Commercial Irrigation Service Schedule 300 Commercial Large Power Service Schedule 400 Low Income Senior Citizen Residential Primary Industrial Service 115KV Schedule 600 Industrial Primary Industrial Service Schedule 500 Residential Schedule 100 - Seasonal Single Phase Residential

47

Little Ferry, New Jersey: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Ferry, New Jersey: Energy Resources Ferry, New Jersey: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.8528777°, -74.0420848° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.8528777,"lon":-74.0420848,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

48

Dobbs Ferry, New York: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Dobbs Ferry, New York: Energy Resources Dobbs Ferry, New York: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 41.0145418°, -73.872635° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.0145418,"lon":-73.872635,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

49

Microsoft Word - AlbanyEugene_ROD-MAP_060112.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Record of Decision June 2012 1 Bonneville Power Administration's Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Record of Decision June 2012 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action Alternative from the Albany-Eugene 115-kilovolt (kV) No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement (EIS) (DOE/EIS-0457, March 2012). The Proposed Action Alternative, which was identified as the agency's preferred alternative in the Final EIS, consists of rebuilding a 32-mile section of the existing Albany-Eugene 115-kV transmission line that extends from the Albany Substation in the City of Albany in Linn County, Oregon, to the Alderwood Tap

50

CX-009088: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3...

51

CX-010430: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale CX(s) Applied: B1.24 Date: 06/20/2013 Location(s): Washington Offices(s): Bonneville Power Administration

52

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

activity-report-april-09-2010 Download CX-000603: Categorical Exclusion Determination Baseload Energy Inc. Brasada-Harney 115-kilovolt Transmission Line Project CX(s) Applied: B4.6...

53

Windy Gap Firming Project  

NLE Websites -- All DOE Office Websites (Extended Search)

action is to relocate approximately 3.8 miles of the existing Estes to Lyons 115-kilovolt transmission line, if the Chimney Hollow Reservoir alternative is constructed. The line...

54

CX-008389: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Danger Tree Management on Estes-Pole Hill and Pole Hill-Flatiron 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 03092012 Location(s): Colorado Offices(s):...

55

Coal dust exposure among power station workers during normal operations at Hatfield's Ferry Power Station.  

E-Print Network (OSTI)

??Changes in coal composition could produce higher levels of coal dust exposure thanthose found in the past at Hatfield's Ferry Power Station. Air sampling was… (more)

Lewis, Christian S.

2008-01-01T23:59:59.000Z

56

The Ferry Building - San Francisco, CA by SMWM; Baldauf Catton von Eckartsberg; Page & Turnbull [EDRA/Places Awards 2007 -- Design  

E-Print Network (OSTI)

franchises. But as this design award to San Francisco FerryBuilding 2007 EDRA/Places Awards Design center for the saleFerry Building 2007 EDRA/Places Awards Design The second key

Sensenig, Chris

2007-01-01T23:59:59.000Z

57

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 11920 of 26,764 results. 11 - 11920 of 26,764 results. Download Inspection Report: INS-L-12-05 Alleged Ethical and Procurement Concerns at the Office of Nuclear Energy http://energy.gov/ig/downloads/inspection-report-ins-l-12-05 Download EIS-0379: Draft Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line http://energy.gov/nepa/downloads/eis-0379-draft-environmental-impact-statement Download Inspection Report: IG-0668 Concerns Regarding Academic Programs at the Bonneville Power Administration and the Savannah River Operations Office http://energy.gov/ig/downloads/inspection-report-ig-0668 Download Technology Readiness Assessment Report This document has been developed to guide individuals and teams that will

58

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 11820 of 28,905 results. 11 - 11820 of 28,905 results. Download EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project http://energy.gov/nepa/downloads/eis-0379-epa-notice-availability-draft-environmental-impact-statement Download Audit Report: IG-0468 Facilities Information Management System http://energy.gov/ig/downloads/audit-report-ig-0468 Download Newsletter (February 2009).pub http://energy.gov/management/downloads/newsletter-february-2009pub Download Office of Classification CommuniQué- Year: 2010 Office of Classification newsletters for the year 2010 consisting of the following issues: CommuniQué 2010-1 - March 2010 CommuniQué 2010-2 - April 2010 http://energy.gov/hss/downloads/office-classification-communiqu-year-2010

59

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 10570 of 28,905 results. 61 - 10570 of 28,905 results. Download portfolioJan2006_final_v2.pdf http://energy.gov/cio/downloads/portfoliojan2006finalv2pdf-1 Article V-038: Google Chrome Two Vulnerabilities Two vulnerabilities have been reported in Google Chrome http://energy.gov/cio/articles/v-038-google-chrome-two-vulnerabilities Download EIS-0379- Final Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line, Libby, Lincoln County, Montana http://energy.gov/nepa/downloads/eis-0379-final-environmental-impact-statement Download CX-000242: Categorical Exclusion Determination Recovery Act: 20 Percent Wind by 2030: Overcoming the Challenges CX(s) Applied: A9 Date: 12/17/2009 Location(s): Montana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

60

EIS-0379 - Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0379 - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-FEIS-2008 More Documents & Publications EIS-0379: Draft Environmental Impact Statement

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Notice of Intent (NOI) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 11, 2005 May 11, 2005 EIS-0375: Advance Notice of Intent to Prepare an Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste May 5, 2005 EIS-0379: Notice of Intent to Prepare an Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line, Libby, Lincoln County, Montana February 14, 2005 EIS-0374: Notice of Intent to Prepare an Environmental Impact Statement Klondike III Wind Project Interconnection, Sherman County, Oregon January 5, 2005 EIS-0238-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement to the Final Site-Wide Environmental Impact Statement Continued Operation of the Los Alamos National Laboratory January 5, 2005 EIS-0380: Notice of Intent to Prepare a Supplemental Environmental Impact

62

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 - 23910 of 31,917 results. 01 - 23910 of 31,917 results. Download EIS-0236: Record of Decision National Ignition Facility http://energy.gov/nepa/downloads/eis-0236-record-decision-1 Download EIS-0379: Draft Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line http://energy.gov/nepa/downloads/eis-0379-draft-environmental-impact-statement Download REGISTERING A TECHNICAL STANDARD PROJECT PurposeThis procedure outlines the process for registering a project to develop a DOE Technical Standard, to perform certain periodic updates (revisions, reaffirmations, inactivations for new... http://energy.gov/hss/downloads/registering-technical-standard-project Download DOE-TSPP-4, Registering a Technical Standard Project- July 1, 2009

63

EIS-0379: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Record of Decision 79: Record of Decision EIS-0379: Record of Decision This Record of Decision was issued for Environmental Impact Statement (EIS-0379) that assessed the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-ROD-2008 More Documents & Publications EIS-0379 - Final Environmental Impact Statement

64

EIS-0379 - Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Final Environmental Impact Statement - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-FEIS-2008 More Documents & Publications EIS-0379: Draft Environmental Impact Statement

65

A "Ferris Bueller Style" Look at Small Business Contracting at the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A "Ferris Bueller Style" Look at Small Business Contracting at the A "Ferris Bueller Style" Look at Small Business Contracting at the Department of Energy A "Ferris Bueller Style" Look at Small Business Contracting at the Department of Energy November 30, 2010 - 4:14pm Addthis Bill Valdez Bill Valdez Principal Deputy Director What does this mean for me? There are several program opportunities for small businesses within the Department of Energy. Some of the things on offer this year include: top-level attention to small business objectives, increased outreach, APAT reviews, new tools for prime contractors, expanded teaming, and expanded mentoring. As Ferris Bueller said, "Life moves pretty fast. If you don't stop and look around once in a while, you could miss something." At the Department of Energy, the Office of Small and Disadvantaged Business Utilization

66

A "Ferris Bueller Style" Look at Small Business Contracting at the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A "Ferris Bueller Style" Look at Small Business Contracting at the A "Ferris Bueller Style" Look at Small Business Contracting at the Department of Energy A "Ferris Bueller Style" Look at Small Business Contracting at the Department of Energy November 30, 2010 - 4:14pm Addthis Bill Valdez Bill Valdez Principal Deputy Director What does this mean for me? There are several program opportunities for small businesses within the Department of Energy. Some of the things on offer this year include: top-level attention to small business objectives, increased outreach, APAT reviews, new tools for prime contractors, expanded teaming, and expanded mentoring. As Ferris Bueller said, "Life moves pretty fast. If you don't stop and look around once in a while, you could miss something." At the Department of Energy, the Office of Small and Disadvantaged Business Utilization

67

The Design and Development of an Irish Sea Passenger-Ferry-Based Oceanographic Measurement System  

Science Conference Proceedings (OSTI)

An evolving coastal observatory has been hosted by the National Oceanography Centre at Liverpool, United Kingdom, for more than nine years. Within this observatory an instrumented ferry system has been developed and operated to provide near-...

C. A. Balfour; M. J. Howarth; D. S. Jones; T. Doyle

2013-06-01T23:59:59.000Z

68

Ship-of-Opportunity Monitoring of the Chilean Fjords Using the Pocket FerryBox  

Science Conference Proceedings (OSTI)

Results from two field campaigns in the Chilean fjords region are presented to demonstrate the benefits and limitations of the “pocket FerryBox” for monitoring from ships of opportunity. The October 2009 (spring) campaign covered the region of the ...

Christopher M. Aiken; Wilhelm Petersen; Friedhelm Schroeder; Martina Gehrung; Paola A Ramírez von Holle

2011-10-01T23:59:59.000Z

69

REDUCTION OF EMISSIONS FROM A HIGH SPEED FERRY  

DOE Green Energy (OSTI)

Emissions from marine vessels are being scrutinized as a major contributor to the total particulate matter (TPM), oxides of sulfur (SOx) and oxides of nitrogen (NOx) environmental loading. Fuel sulfur control is the key to SOx reduction. Significant reductions in the emissions from on-road vehicles have been achieved in the last decade and the emissions from these vehicles will be reduced by another order of magnitude in the next five years: these improvements have served to emphasize the need to reduce emissions from other mobile sources, including off road equipment, locomotives, and marine vessels. Diesel-powered vessels of interest include ocean going vessels with low- and medium-speed engines, as well as ferries with high speed engines, as discussed below. A recent study examined the use of intake water injection (WIS) and ultra low sulfur diesel (ULSD) to reduce the emissions from a high-speed passenger ferry in southern California. One of the four Detroit Diesel 12V92 two-stroke high speed engines that power the Waverider (operated by SCX, inc.) was instrumented to collect intake airflow, fuel flow, shaft torque, and shaft speed. Engine speed and shaft torque were uniquely linked for given vessel draft and prevailing wind and sea conditions. A raw exhaust gas sampling system was utilized to measure the concentration of NOx, carbon dioxide (CO2), and oxygen (O2) and a mini dilution tunnel sampling a slipstream from the raw exhaust was used to collect TPM on 70 mm filters. The emissions data were processed to yield brake-specific mass results. The system that was employed allowed for redundant data to be collected for quality assurance and quality control. To acquire the data, the Waverider was operated at five different steady state speeds. Three modes were in the open sea off Oceanside, CA, and idle and harbor modes were also used. Data have showed that the use of ULSD along with water injection (WIS) could significantly reduce the emissions of NOx and PM while not affecting fuel consumption or engine performance compared to the baseline marine diesel. The results showed that a nominal 40% reduction in TPM was realized when switching from the marine diesel to the ULSD. A small reduction in NOx was also shown between the marine fuel and the ULSD. The implementation of the WIS showed that NOx was reduced significantly by between 11% and 17%, depending upon the operating condition. With the WIS, the TPM was reduced by a few percentage points, which was close to the confidence in measurement.

Thompson,G.; Gautam, M; Clark, N; Lyons, D; Carder, D; Riddle, W; Barnett, R; Rapp, B; George, S

2003-08-24T23:59:59.000Z

70

Investigation of Browns Ferry 2 Reactor, Cycle 12 Corrosion Failures: Volume 1: Poolside Examination Results  

Science Conference Proceedings (OSTI)

BWR fuel rods of the GE13 (9x9) design developed leaks during Cycle 12 of the Browns Ferry 2 reactor. This report presents the results of an examination of this fuel and similar, non-leaking assemblies in the storage pool at the Browns Ferry site. The objective was to define the extent of leakage and the conditions associated with the leaking rods.

2004-12-22T23:59:59.000Z

71

Shutdown Hideout Return Chemistry at Browns Ferry-2 and Hatch-2  

Science Conference Proceedings (OSTI)

This report describes and analyzes the results of augmented hideout return studies conducted at the Browns Ferry 2 and Hatch 2 boiling water reactors (BWRs) during shutdowns in the spring of 2003. The aim was to provide insights into differences in corrosion of similar fuel cladding materials at the two facilities.

2004-03-04T23:59:59.000Z

72

FERRIS AND HANNA COAL IN THE HANNA AND CARBON BASINS, WYOMING: A SYNTHESIS  

E-Print Network (OSTI)

Chapter HS FERRIS AND HANNA COAL IN THE HANNA AND CARBON BASINS, WYOMING: A SYNTHESIS By R of selected Tertiary coal beds and zones in the Northern RockyMountains and Great Plains region, U Resource assessment of selected Tertiary coal beds and zones in the Northern Rocky Mountains and Great

73

Process Data Network Architecture Plan for the Browns Ferry Nuclear Plants  

Science Conference Proceedings (OSTI)

Computer networks are essential in efficiently managing the large volumes of data used in power plant operation. Nuclear plants, however, have been cautious in applying computer technology because of their unique safety, security, and regulatory requirements. This report describes a strategic plan developed to manage the evolution of the network that processes real-time operating data for Tennessee Valley Authority's Browns Ferry nuclear plants.

1994-01-01T23:59:59.000Z

74

Investigation of Browns Ferry 2 Reactor Cycle 12 Fuel Corrosion Failures  

Science Conference Proceedings (OSTI)

BWR fuel rods from 63 bundles of the Reload 10 GE13 (9x9) design developed leaks during Cycle 12 of the Browns Ferry 2 reactor. Poolside examination subsequently revealed accelerated cladding corrosion as the apparent failure mechanism (EPRI report 1009729). The failure root cause could not be determined from site examinations alone and thus follow-on hot cell examinations were needed to provide additional information that might help to further understand the failure mechanism, the root cause, and linger...

2006-06-19T23:59:59.000Z

75

Investigation of Browns Ferry 2 Reactor Cycle 12 Fuel Corrosion Failures, Volume 3: Assessment of Results  

Science Conference Proceedings (OSTI)

Boiling water reactor (BWR) fuel rods from 63 bundles of the Reload 10 GE13 (9x9) design developed leaks during Cycle 12 of the Browns Ferry 2 reactor. Root cause evaluations, including poolside and hot cell examinations were performed. The details of the investigation are documented in a series of reports and presentations. This report compiles significant findings of the overall investigation and assesses these results with respect to the cause of failure. In addition, new laboratory data to support th...

2007-12-05T23:59:59.000Z

76

CX-000556: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56: Categorical Exclusion Determination 56: Categorical Exclusion Determination CX-000556: Categorical Exclusion Determination Willoby Substation Construction Project-Weld County, Colorado CX(s) Applied: B4.11 Date: 12/16/2009 Location(s): Weld County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration proposes to construct the new 115-kilovolt Willoby Substation in Weld County, Colorado. The proposed substation would replace the Prospect Valley Tap structures at the juncture of the existing Kiowa Creek-Well 115-kilovolt transmission line and the Prospect Valley-Prospect Valley Tap 115-kilovolt transmission line. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000556.pdf More Documents & Publications CX-010549: Categorical Exclusion Determination

77

"1. Browns Ferry","Nuclear","Tennessee Valley Authority",3309  

U.S. Energy Information Administration (EIA) Indexed Site

Alabama" Alabama" "1. Browns Ferry","Nuclear","Tennessee Valley Authority",3309 "2. James H Miller Jr","Coal","Alabama Power Co",2675 "3. Barry","Coal","Alabama Power Co",2575 "4. E C Gaston","Coal","Alabama Power Co",1878 "5. H Allen Franklin Combined Cycle","Gas","Southern Power Co",1815 "6. Joseph M Farley","Nuclear","Alabama Power Co",1734 "7. Widows Creek","Coal","Tennessee Valley Authority",1604 "8. Colbert","Coal","Tennessee Valley Authority",1574 "9. E B Harris Electric Generating Plant","Gas","Southern Power Co",1269

78

Fuel Reliability Program: Browns Ferry Fuel Corrosion Failures Root Cause Investigation  

Science Conference Proceedings (OSTI)

Sixty-three GE13 fuel bundles failed in Browns Ferry Unit 2 (BF2) during Cycle 12; three GE13 assemblies failed in BF Unit 3 (BF3) during Cycle 11. The affected fuel in BF2 was in its second cycle of operation and the fuel in BF3 in its third at the time of failure. Global Nuclear Fuel (GNF), General Electric-Hitachi (GEH), Tennessee Valley Authority (TVA), and the Electric Power Research Institute (EPRI) investigated the cause of the failures. The investigation included evaluations of materials and manu...

2010-09-30T23:59:59.000Z

79

Transmission INTRODUCTION  

E-Print Network (OSTI)

Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing to maintain control over the transmission system can result in failure of the entire electrical system of supply, demand, and transmission capability. Transmission system operators are primarily responsible

80

CX-010410: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Oracle to Tucson 115 Kilovolt Transmission Line, Cross Arm Replacements at Structure 2/5 and 7/3 CX(s) Applied: B1.3 Date: 05/02/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

CX-010551: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Alcova-Miracle Mile East 115 Kilovolt Transmission Line Structure Replace and Road Maintenance, Carbon and Natrona Counties, Wyoming CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

82

Annual radiological environmental operating report: Browns Ferry Nuclear Plant, 1992. Operations Services/Technical Programs  

Science Conference Proceedings (OSTI)

This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of Browns Ferry Nuclear Plant (BFN) in 1992. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. Small amounts of Co-60 and Cs-134 were found in sediment samples downstream from the plant. This activity in stream sediment would result in no measurable increase over background in the dose to the general public.

Not Available

1993-04-01T23:59:59.000Z

83

BWRVIP-271NP: BWR Vessel and Internals Project, Testing and Evaluation of the Browns Ferry Unit 2 120° Capsule  

Science Conference Proceedings (OSTI)

In the late 1990s, a Boiling Water Reactor Vessel and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) was developed to improve the surveillance of the U.S. BWR fleet. This report describes testing and evaluation of the Browns Ferry Unit 2 120° capsule. These results will be used to monitor embrittlement as part of the BWRVIP ISP.BackgroundThe BWRVIP ISP represents a major enhancement to the process of monitoring embrittlement for the U.S. ...

2013-04-03T23:59:59.000Z

84

Long-Term Testing of Protective Coatings and Claddings at Allegheny Energy Supply Hatfield's Ferry #2 Boiler  

Science Conference Proceedings (OSTI)

Excessive waterwall corrosion due to the presence of iron sulfide (FeS) deposits was discovered in an Allegheny Energy Supply boiler firing eastern bituminous coal and retrofitted with a low-nitrogen oxide (NOx) cell burner (LNCB) system. Weld overlays with a high chromium (Cr) content reduced corrosion rates to tolerable levels. This report summarizes EPRI's long-term service tests of various coatings and weld overlays in the company's Hatfield's Ferry #2 boiler.

2000-09-15T23:59:59.000Z

85

Fuel Reliability Program: Hot Cell Investigation and Assessment of GE14 Failures in Browns Ferry Unit 3  

Science Conference Proceedings (OSTI)

Browns Ferry 3 Cycle 12 began operation in April 2004, but on July 19, 2004, an off-gas radiation monitor increase and subsequent grab sample confirmed the presence of failures in two second-cycle GE14 (10 x 10) bundles. The failures coincided with power changes during a control rod sequence exchange; however, local rod power and the change in rod power levels were well below design limits and operating experience from another GE14 failure in Hatch Unit 1 (described in Electric Power Research Institute [...

2010-09-01T23:59:59.000Z

86

Fuel Reliability Program: Post-Irradiation Examination and Performance Assessment of ATRIUM-10 BWR Fuel from Browns Ferry-3 Reactor  

Science Conference Proceedings (OSTI)

ATRIUM-10 design (10x10 lattice) fuel was irradiated for one 24-month period during Cycle 12 to 25 MWd/kgU rod-average exposure at Tennessee Valley Authority's Browns Ferry Unit 3 reactor. The project goal was to characterize the behavior of modern boiling water reactor (BWR) fuel at low exposures to assess early-life performance in a well-documented reactor environment. This report includes results from hot cell post-irradiation examinations. In a future Electric Power Research Institute (EPRI) report, ...

2011-06-09T23:59:59.000Z

87

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

88

CX-001121: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

121: Categorical Exclusion Determination 121: Categorical Exclusion Determination CX-001121: Categorical Exclusion Determination Transmission Line Structure Relocation of Existing Oracle-Tucson 115-kilovolt Transmission Line CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Relocate part of Oracle-Tucson 115 kilovolt transmission line in cooperation with Pima County Department of Transportation for their La Canada Drive roadway expansion. This project involves removing 17 existing transmission line pole structures, and will furnish and install 17 new monopoles in a new location within within Western's right-of-way. Western will be using existing access roads and vehicles such as an auger, pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and

89

EA-1931: Keeler-Forest Grove, Forest Grove-Tillamook Line No. 1 Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

This EA will evaluate the potential environmental impacts of a BPA proposal to rebuild its 58 mile long, 115 kilovolt (kV) wood pole Keeler-Forest Grove and Forest Grove-Tillamook transmission lines. The deteriorated transmission line structures (wood pole structures, switches, cross arms, braces, guys, anchors, insulator assemblies and conductor) need to be replaced in order to maintain reliable electrical service, avoid risks to the public, and ensure worker safety.

90

CX-008377: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

377: Categorical Exclusion Determination 377: Categorical Exclusion Determination CX-008377: Categorical Exclusion Determination Alcova-Casper North 115 Kilovolt Transmission Line Pole Replacements CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration's (Western) Casper Field Office proposes to replace deteriorating poles on 18 wood H-frame structures along its Alcova-Casper North 115 kilovolt (kV) transmission line. The project structures are located on the transmission line between Township 33 North, Range 80 West, Section 12 and Township 30 North, Range 82 West, Section 18, 6th Principle Meridian near Casper, Wyoming in Natrona County. CX-008377.pdf More Documents & Publications CX-010551: Categorical Exclusion Determination

91

CX-000555: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

555: Categorical Exclusion Determination 555: Categorical Exclusion Determination CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration proposes to conduct vegetation management activities within the 125-foot transmission line right-of-way and perform maintenance on existing access roads along the Boysen-Pilot Butte 115-kilovolt transmission line in Fremont County, Wyoming. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000555.pdf More Documents & Publications CX-004456: Categorical Exclusion Determination CX-009801: Categorical Exclusion Determination

92

CX-006298: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

298: Categorical Exclusion Determination 298: Categorical Exclusion Determination CX-006298: Categorical Exclusion Determination Interconnection of the Letcher to Mitchell 115 Kilovolt Transmission Line to Western's Letcher Substation CX(s) Applied: B4.11 Date: 07/08/2011 Location(s): Montana Office(s): Western Area Power Administration-Upper Great Plains Region Interconnection of Northwestern Energy's 115 kilovolt Letcher to Mitchell transmission line at Western's Letcher substation. Northwestern Energy is proposing to build a 14.5 mile transmission line between their Mitchell substation and Western's Letcher substation to shore up reliability of their electrical system in the area. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006298.pdf More Documents & Publications CX-006303: Categorical Exclusion Determination

93

CX-003195: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95: Categorical Exclusion Determination 95: Categorical Exclusion Determination CX-003195: Categorical Exclusion Determination Oracle-Tucson 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B4.13 Date: 06/10/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to relocate 5 steel monopole transmission line structures on our Oracle-Tucson 115-kilovolt transmission line to accommodate Federal Highway Administration's La Canada Road Widening Project in Tucson. This project involves removing structures 19/4, 19/11, 20/1, 20/2, 20/3, and furnishing and installing 5 new steel monopoles and foundations in a new location within Western's Right of Way. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

94

High Pressure Coolant Injection (HPCI) System Risk-Based Inspection Guide for Browns Ferry Nuclear Power Station  

Science Conference Proceedings (OSTI)

The High Pressure Coolant Injection (HPCI) system has been examined from a risk perspective. A System Risk-Based Inspection Guide (S-RIG) has been developed as an aid to HPCI system inspections at the Browns Ferry Nuclear Power Plant, Units 1, 2 and 3. The role of. the HPCI system in mitigating accidents is discussed in this S-RIG, along with insights on identified risk-based failure modes which could prevent proper operation of the system. The S-RIG provides a review of industry-wide operating experience, including plant-specific illustrative examples to augment the PRA and operational considerations in identifying a catalogue of basic PRA failure modes for the HPCI system. It is designed to be used as a reference for routine inspections, self-initiated safety system functional inspections (SSFIs), and the evaluation of risk significance of component failures at the nuclear power plant.

Wong, S.; DiBiasio, A.; Gunther, W. [Brookhaven National Lab., Upton, NY (United States)

1993-09-01T23:59:59.000Z

95

EIS-0159: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

159: Record of Decision 159: Record of Decision EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado The Department of Energy (DOE), Western Area Power Administration (Western) has prepared this Record of Decision (ROD) pursuant to regulations of the Council on Environmental Quality (40 CFR Part 1505) and Implementing Procedures of the Department of Energy (10 CFR Part 1021). This ROD is based upon the information contained in the ''Final Environmental Impact Statement, Flatiron-Erie 115-kV Transmission Line, Larimer, Boulder & Weld Counties, Colorado'' (DOE/EIS-0159). Western has considered all public and regulatory comments received on the final EIS in preparation of this ROD. DOE/EIS-0159, Western Area Power Administration Flatiron-Erie 115-kilovolt

96

CX-006303: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03: Categorical Exclusion Determination 03: Categorical Exclusion Determination CX-006303: Categorical Exclusion Determination Interconnection of the Pronghorn Gas Plant 115 Kilovolt Transmission Line CX(s) Applied: B4.11 Date: 07/14/2011 Location(s): Montana Office(s): Western Area Power Administration-Upper Great Plains Region In order to bring power into Western's substation, Upper Missouri and Roughrider must interconnect their Pronghorn substation, located in SEC 17 T140N R99W, to the proposed South Heart substation, located in SEC20 T140N R98W, and then the South Heart substation to Western's Belfield substation, located in SEC20 T140N R98W. This would be accomplished by building a roughly eight mile stretch of 115-kilovolt (kV) transmission line east-west between Pronghorn and South Heart, and a north-south tie-line of less than

97

CX-003086: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Categorical Exclusion Determination 6: Categorical Exclusion Determination CX-003086: Categorical Exclusion Determination Improvement of Access Roads on the Cougar-Thurston Number 1 115-Kilovolt and the Thurston-McKenzie Number 1 115-Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 06/25/2010 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to improve existing access roads for the Cougar-Thurston and the Thurston-McKenzie transmission lines in Lane County, Oregon. The project includes blading, rocking, and installing proper drainage for the existing access roads that are degraded with rutting, erosion, cut bank destabilization, and improper surface water drainage characteristics. All road maintenance will take place within the

98

CX-004254: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

254: Categorical Exclusion Determination 254: Categorical Exclusion Determination CX-004254: Categorical Exclusion Determination Seven Mile Project CX(s) Applied: B1.11, B4.6, B4.11 Date: 10/07/2010 Location(s): Linn County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace a line disconnect switch, replace an existing Potential Transformer (PT), and install one new PT at tower 6/8 on the Albany- Lebanon Number 1 115-kilovolt Transmission Line in Linn County, Oregon. In addition, tower 8/6 on the Albany-Lebanon No. 1 115-kilovolt Transmission Line will be moved roughly 40 feet back-on-line and a new line disconnect switch (plus stand) will be installed approximately 12 feet ahead-of-line relative to the present location of tower 8/6. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

99

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2012 2, 2012 CX-009440: Categorical Exclusion Determination State Energy Plan Council School District Woody Biomass Project CX(s) Applied: B5.1, B5.5 Date: 07/02/2012 Location(s): Idaho Offices(s): Golden Field Office July 2, 2012 CX-008782: Categorical Exclusion Determination Danger Tree Management on North Gunnison to Skito 115 Kilovolt Transmission Line Gunnison County, Colorado CX(s) Applied: B1.3 Date: 07/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region July 2, 2012 CX-008781: Categorical Exclusion Determination Danger Tree Management on Curecanti to Blue Mesa 115 Kilovolt Transmission Line Gunnison County, Colorado CX(s) Applied: B1.3 Date: 07/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

100

CX-003196: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

196: Categorical Exclusion Determination 196: Categorical Exclusion Determination CX-003196: Categorical Exclusion Determination Emergency Crossarm Replacement at Structure 39/7 and Access Road Maintenance along the Existing Tucson-Apache 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B1.3 Date: 07/08/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to conduct Emergency Crossarm Replacement at Structure 39/7 and Access Road Maintenance along the existing Tucson-Apache 115-kilovolt transmission line. This will consist of blading and leveling out areas of the existing access road using a dozer and bucket trucks, crew trucks and pickup trucks to replace the crossarm at the structure. This work is necessary to maintain the safety and

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

CX-008400: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX-008400: Categorical Exclusion Determination CX-008400: Categorical Exclusion Determination CX-008400: Categorical Exclusion Determination Estes Park to Mary's Lake West 115 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 05/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to replace two existing wood H-frame structures along the Estes Park to Mary's Lake West 115 kilovolt transmission line. The structures are located on private land near the community of Mary's Lake in Larimer County, Colorado. CX-008400.pdf More Documents & Publications CX-008386: Categorical Exclusion Determination CX-008381: Categorical Exclusion Determination CX-008389: Categorical Exclusion Determination

102

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 4250 of 9,640 results. 41 - 4250 of 9,640 results. Download CX-008708: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Olympia No. 1 and Chehalis-Mayfield No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/25/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008708-categorical-exclusion-determination Download CX-008709: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008709-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination

103

CX-004742: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

742: Categorical Exclusion Determination 742: Categorical Exclusion Determination CX-004742: Categorical Exclusion Determination De Moss-Fossil 115-Kilovolt Line Upgrade CX(s) Applied: B4.6 Date: 12/13/2010 Location(s): Wasco County, Oregon Office(s): Bonneville Power Administration Work at the De Moss Substation would entail expanding the existing substation yard to accommodate a new 4-terminal ring bus. Excavation within an area approximately 160-feet (ft) by 242-ft adjacent to the existing control house would be required to construct foundations. The project would also entail the construction of approximately 200 feet of new 115-kilovolt transmission line between the De Moss Substation and the nearby Gordon Hollow Tap. The construction of the new transmission line would entail the construction of two new wood pole structures, which would entail auguring a

104

EIS-0159: Record of Decision | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: Record of Decision 9: Record of Decision EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado The Department of Energy (DOE), Western Area Power Administration (Western) has prepared this Record of Decision (ROD) pursuant to regulations of the Council on Environmental Quality (40 CFR Part 1505) and Implementing Procedures of the Department of Energy (10 CFR Part 1021). This ROD is based upon the information contained in the ''Final Environmental Impact Statement, Flatiron-Erie 115-kV Transmission Line, Larimer, Boulder & Weld Counties, Colorado'' (DOE/EIS-0159). Western has considered all public and regulatory comments received on the final EIS in preparation of this ROD. DOE/EIS-0159, Western Area Power Administration Flatiron-Erie 115-kilovolt

105

CX-006816: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

816: Categorical Exclusion Determination 816: Categorical Exclusion Determination CX-006816: Categorical Exclusion Determination Line and Load Interconnection of Coos-Curry Electric Cooperative?s New Substation to Bonneville Power Administration?s Fairview-Bandon 115-Kilovolt Transmission Line CX(s) Applied: B4.6, B4.10 Date: 09/26/2011 Location(s): Coos County, Oregon Office(s): Bonneville Power Administration In response to the line and load interconnection request submitted by Coos-Curry, Bonneville Power Administration (BPA) proposes to provide and install tap jumpers between BPA?s Fairview-Bandon 115-kilovolt (kV) transmission line and Coos-Curry?s new 115/24.9-kV substation. The tap jumpers would consist of line extensions from the BPA Fairview-Bandon #1 115-kV line to the Coos-Curry conductors terminated on the "H" frame wood

106

Cooperation (Transmission  

E-Print Network (OSTI)

Pricing in Wireless Networks Peter Marbach Department of Computer Science University of Toronto #12; Model/Terminology A B #15; Routes are Fixed #15; C r : Capacity of Node r #15; U r (x r ): Utility Function of Node r 6 #12; Model/Terminology #15; x r : Transmission Rate of Node r #15; y r

Marbach, Peter

107

EIS-0451: Hooper Springs Project, Caribou County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the environmental impacts of DOE’s Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho.

108

CX-008382: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

82: Categorical Exclusion Determination 82: Categorical Exclusion Determination CX-008382: Categorical Exclusion Determination Bridgeport-Sidney 115 Kilovolt Line Rejected Pole Replacement CX(s) Applied: B1.3 Date: 03/16/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) regularly inspects the structures that support our transmission lines and occasionally needs to replace structures that have failed these inspections. To avoid an outage caused by the failure of shell rotted poles, Western will conduct pole replacements on three structures in the Bridgeport-Sidney 115 kilovolt line. The structure numbers are 134, 24, and 14. The work will be done in mid- summer 2012 to avoid disrupting the landowner's wheat harvest.

109

Categorical Exclusion Determinations: American Recovery and Reinvestment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determinations: American Recovery and Categorical Exclusion Determinations: American Recovery and Reinvestment Act Related Categorical Exclusion Determinations: American Recovery and Reinvestment Act Related Categorical Exclusion Determinations issued for actions related to the the American Recovery and Reinvestment Act of 2009. DOCUMENTS AVAILABLE FOR DOWNLOAD June 28, 2010 CX-002841: Categorical Exclusion Determination Texas Propane Fleet Pilot Program (Summary Categorical Exclusion) CX(s) Applied: A7, B5.1 Date: 06/28/2010 Location(s): Texas Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 25, 2010 CX-003086: Categorical Exclusion Determination Improvement of Access Roads on the Cougar-Thurston Number 1 115-Kilovolt and the Thurston-McKenzie Number 1 115-Kilovolt Transmission Lines

110

CX-000602: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

02: Categorical Exclusion Determination 02: Categorical Exclusion Determination CX-000602: Categorical Exclusion Determination Tillamook-Oceanside, 115-kilovolt Substation Interconnection CX(s) Applied: B4.6 Date: 01/07/2010 Location(s): Tillamook County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) substation terminal at Bay 6 of BPA's Tillamook Substation in order to accommodate Tillamook Public Utility District's (PUD's) request to interconnect its new Oceanside 115-kV transmission line. Relay and metering devices will compose the new terminal at Bay 6 where BPA will connect the last span of Tillamook PUD's new Oceanside 115-kV line. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000602.pdf More Documents & Publications

111

Airspace: Antarctic Sound Transmission  

E-Print Network (OSTI)

Antarctic Sound Transmission Andrea Polli Director,investigates how sound transmission can contribute to thePoles. How have such transmission-based projects developed

Polli, Andrea

2009-01-01T23:59:59.000Z

112

Transmission Investment: A Primer  

SciTech Connect

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

113

Hydromechanical transmission  

DOE Patents (OSTI)

A power transmission having three planetary assemblies, each having its own carrier and its own planet, sun, and ring gears. A speed-varying module is connected in driving relation to the input shaft and in driving relationship to the three sun gears, all of which are connected together. The speed-varying means may comprise a pair of hydraulic units hydraulically interconnected so that one serves as a pump while the other serves as a motor and vice versa, one of the units having a variable stroke and being connected in driving relation to the input shaft, the other unit, which may have a fixed stroke, being connected in driving relation to the sun gears. The input shaft also drives the carrier of the third planetary assembly. A brake grounds the first carrier in the first range and in reverse and causes drive to be delivered to the output through the first ring gear in a hydrostatic mode. The carrier of the third planetary assembly drives the ring gear of the second planetary assembly, and a first clutching means connects the second carrier with the output in a second range, the brake for grounding the first carrier then being released. A second clutching means enables the third ring gear to drive the output shaft in a third range.

Orshansky, Jr. deceased, Elias (LATE OF San Francisco, CA); Weseloh, William E. (San Diego, CA)

1978-01-01T23:59:59.000Z

114

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

115

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

116

Regulations for Electric Transmission and Fuel Gas Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long...

117

DOE Transmission Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Workshop November 1, 2012 Federal Energy Regulatory Commission Commissioner Cheryl LaFleur 1 FERC's Transmission Efforts Reliability and Grid Security Planning...

118

Transmission | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Usage Transmission Transmission Once electricity is generated -- whether by burning fossil fuels; through nuclear fission; or by harnessing wind, solar, geothermal, or hydro...

119

Merchant transmission investment  

E-Print Network (OSTI)

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

120

EA-1591: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding of No Significant Impact Finding of No Significant Impact EA-1591: Finding of No Significant Impact Palisades - Goshen Transmission Line Reconstruction Project The Bonneville Power Administration (BPA) announces its environmental findings on the Palisades-Goshen Transmission Line Reconstruction Project. The project involves rebuilding the existing Palisades-Goshen 115-kilovolt (kV) transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. Palisades-Goshen Transmission Line Reconstruction Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings More Documents & Publications EA-1591: Final Environmental Assessment, Finding of No Significant Impact, and Mitigation Action Plan

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Independent transmission company (ITC) and markets for transmission  

E-Print Network (OSTI)

Independent Abstract-- transmission company (ITC) and markets for transmission Yong T. Yoon Marija a fundamental structure for the transmission provider (TP) composed of the independent transmission company (ITC out the associated functions including managing transmission congestion. At the minimum

Ilic, Marija D.

122

Three essays concerning information transmission  

E-Print Network (OSTI)

Transmissionas an Information-Transmission Mechanism,” American EconomicConcerning Information Transmission A dissertation submitted

Boone, Johnathan

2010-01-01T23:59:59.000Z

123

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

124

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

125

Hatchery Evaluation Report / Lyons Ferry Hatchery - Fall Chinook : An Independent Audit Based on Integrated Hatchery Operations Teams (IHOT) Performance Measures : Final Report.  

SciTech Connect

This report presents the findings of the independent audit of the Lyons Ferry Hatchery (Fall Chinook). The audit is being conducted as a requirement of the Northwest Power Planning Council (NPPC) ``Strategy for Salmon`` and the Columbia River Basin Fish and Wildlife Program. Under the audit, the hatcheries are evaluated against policies and related performance measures developed by the Integrated Hatchery Operations Team (IHOT). IHOT is a multi-agency group established by the NPPC to direct the development of new basinwide standards for managing and operating fish hatcheries. The audit was conducted in April 1996 as part of a two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the US Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife.

Watson, Montgomery

1996-05-01T23:59:59.000Z

126

National Transmission Grid Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

127

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

128

Arnold Schwarzenegger TRANSMISSION BENEFIT  

E-Print Network (OSTI)

California Edison's (SCE) initial Tehachapi transmission trunk-line proposal for integration of wind. The Tehachapi Transmission Project to integrate 4,500 MW of renewable wind energy has since been approved after

129

Transmission Investment Incentives  

Science Conference Proceedings (OSTI)

This report documents the use of agent-based simulation as a tool for studying transmission investment incentives, and it is meant to illuminate what accounts for the difficulties in aligning incentives for enhancing the transmission system. The report suggests that a new method of calculation for bid optimization be applied to the economic analysis of long-term incentives for transmission investment. This technology can be broadly applied to help negotiators in transmission planning quantify their count...

2006-12-21T23:59:59.000Z

130

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

cable transmission systems:5 two 500 kV circuits, a high-voltage direct current (HVDC) system and two to serve VI and the HVDC link is expected to be completely retired in 2007. This erosion in transmission / replacement of the HVDC cables (at a cost of $230 million), as well as transmission upgrades on the mainland

131

Automated manual transmission controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

132

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

133

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications 2013 Transmission Reliability Program Peer Review - Day 1...

134

Definition: Transmission Service Provider | Open Energy Information  

Open Energy Info (EERE)

Transmission Service Provider The entity that administers the transmission tariff and provides Transmission Service to Transmission Customers under applicable...

135

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

136

Video Transmission Jerkiness Measure.  

E-Print Network (OSTI)

??Digital video transmission is widely used nowadays in multimedia. Frame dropping, freeze and reduced number of frames in the transmitted video are common symptoms of… (more)

Abdelsamad, Deena

2013-01-01T23:59:59.000Z

137

NIST Transmission SEM  

Science Conference Proceedings (OSTI)

... As a result, more electrons will scatter, to provide the ... RR Keller, "Transmission EBSD in the Scanning Electron Microscope," Microscopy Today vol. ...

2013-07-29T23:59:59.000Z

138

Patterns of transmission investment  

E-Print Network (OSTI)

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

139

The progressive transmission disadvantage  

Science Conference Proceedings (OSTI)

The disadvantage of progressive transmission, compared to transmission in a single step, is analyzed for the high-rate case using a polytope that is self-similar under binary subdivision. This disadvantage is calculated to be 0.3424 dB or 0.057 bit compared ...

M. J. Durst

1997-01-01T23:59:59.000Z

140

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

FOR ELECTRIC POWER TRANSMISSION  

E-Print Network (OSTI)

A contract network extends the concept of a contract path to address the problem of loop flow and congestion in electric power transmission systems. A contract network option provides a well defined, internally consistent framework for assigning long-term capacity rights to a complicated electric transmission network. The contract network respects the special conditions induced by Kirchoff's Laws; accommodates thermal, voltage and contingency constraints on transmission capacity; and can be adopted without disturbing existing methods for achieving an economic power dispatch subject to these constraints. By design, a contract network would maintain short-run efficiency through optimal spot price determination of transmission prices. Through payment of congestion rentals, the contract network makes a long-term capacityright holder indifferent between delivery of the power or receipt of payments in a settlement system. And the contract network framework can support allocation of transmission capacity rights through a competitive bidding process. CONTRACT NETWORKS

William W. Hogan; William W. Hogan

1990-01-01T23:59:59.000Z

142

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

Science Conference Proceedings (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

143

Down hole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. The electrically conducting coil comprises at least two generally fractional loops. In the preferred embodiment, the transmission elements are connected by an electrical conductor. Preferably, the electrical conductor is a coaxial cable. Preferably, the MCEI trough comprises ferrite. In the preferred embodiment, the fractional loops are connected by a connecting cable. In one aspect of the present invention, the connecting cable is a pair of twisted wires. In one embodiment the connecting cable is a shielded pair of twisted wires. In another aspect of the present invention, the connecting cable is a coaxial cable. The connecting cable may be disposed outside of the MCEI circular trough.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT)

2007-07-24T23:59:59.000Z

144

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

145

Transmission Electron Microscopy (TEM)  

Science Conference Proceedings (OSTI)

...Transmission electron microcopy (TEM) has been used since the 1950s to obtain very high resolution images of microstructures. As TEMs were enhanced to include features such as digitally scanned point beams and energy dispersive x-ray detectors

146

Designing electricity transmission auctions  

E-Print Network (OSTI)

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

147

Downhole transmission system  

DOE Patents (OSTI)

A transmission system in a downhole component comprises a data transmission element in both ends of the downhole component. Each data transmission element houses an electrically conducting coil in a MCEI circular trough. An electrical conductor connects both the transmission elements. The electrical conductor comprises at least three electrically conductive elements insulated from each other. In the preferred embodiment the electrical conductor comprises an electrically conducting outer shield, an electrically conducting inner shield and an electrical conducting core. In some embodiments of the present invention, the electrical conductor comprises an electrically insulating jacket. In other embodiments, the electrical conductor comprises a pair of twisted wires. In some embodiments, the electrical conductor comprises semi-conductive material.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2008-01-15T23:59:59.000Z

148

Cloud Transmissivities for Canada  

Science Conference Proceedings (OSTI)

Transmissivities are determined for different cloud types using nine years of hourly irradiance measurements under overcast skies at six Canadian stations. Values for individual stations and for pooled data using irradiances uncorrected for ...

J. A. Davies; M. Abdel-Wahab; J. E. Howard

1985-03-01T23:59:59.000Z

149

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

150

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

151

Open Access Transmission Tariff  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

152

Definition: Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Jump to: navigation, search Dictionary.png Transmission An interconnected group of lines and associated equipment for the movement or transfer of electric energy...

153

Interconnection Transmission Planning: Awards | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and...

154

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

ColoradoTransmissionAgencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary...

155

Electricity Transmission, A Primer | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

156

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

157

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

158

Electric Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

159

10-Yr. Transmission Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

160

Merchant Transmission Investment  

E-Print Network (OSTI)

merchant transmission model of the type described above, though Australia has adopted a mixed merchant and regu- 6 lated transmission model.3 However, recent academic proposals,4 as well as FERC’s July 2002 Standard Market Design (SMD) proposals, call... that a nodal or locational marginal pricing (LMP) system is in place with attributes similar to those being proposed by the U.S. Federal Energy Regulatory Commission (FERC) in its SMD proposals and to what is in operation in New 3Two merchant lines...

Joskow, Paul; Tirole, Jean

2004-06-16T23:59:59.000Z

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

NREL: Energy Analysis: Transmission Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

162

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

163

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

164

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

165

Transmission SEAB Presentation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

166

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, Oleg M. (1739 Grandview #2, Idaho Falls, ID 83402)

1993-01-01T23:59:59.000Z

167

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

168

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network (OSTI)

involves the construction of an approximate 1000 mile HVAC and HVDC transmission project from British ACSR. (Northern Segment) b) A 3000 MVA, 500 kV HVAC to +/-500 kV HVDC Converter at the NEO Station. c) A +/-500 kV HVDC line from the NEO Station to the proposed Collinsville Substation in the San Francisco Bay

169

LAP Transmission Rate  

NLE Websites -- All DOE Office Websites (Extended Search)

LAP Transmission Rate 4.50 4.00 3.82 3.50 3.00 of 2.50 c 0 2.I2 2.68 I 3: 2.00 1.50 1.00 0.50 0.00 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012...

170

Transmission Services J7000  

NLE Websites -- All DOE Office Websites (Extended Search)

C T D E S E R T S O U T H W E S T R E G I O N R O C K Y M O U N T A I N R E G I O N Transmission Services J7000 Ensuring the Reliability of the Bulk Electric System Western's...

171

Transmission planning in China  

Science Conference Proceedings (OSTI)

Though China is well along in restructuring its power markets, it still has some way to travel before economic considerations receive adequate weight in transmission planning decisions. Adoption of more sophisticated tools such as multi-agent modeling will help China continue in its progress in achieving this. (author)

Dong, Jun; Zhang, Jing

2009-07-15T23:59:59.000Z

172

Borehole data transmission apparatus  

DOE Patents (OSTI)

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

173

Omega Transmission Lines  

E-Print Network (OSTI)

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

174

Transmission Enhancement Technology Report  

E-Print Network (OSTI)

to increase transmission capability. Section 3 documents existing technologies used in the industry today the traditional types of design alternatives used by Western and the electric industry. The primary system operate at three times the ampacity of Aluminum Conductor Steel Reinforced (ACSR) conductor and has a much

175

Autonomous data transmission apparatus  

DOE Patents (OSTI)

A autonomous borehole data transmission apparatus is described for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters. 4 figs.

Kotlyar, O.M.

1997-03-25T23:59:59.000Z

176

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

177

Transmission Developers Inc.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

178

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

179

Transmission Siting_071508.indd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

180

A Smarter Transmission Grid  

Science Conference Proceedings (OSTI)

Our modern transmission grid transports bulk power over long distances and across many provincial boundaries, but ever-increasing energy demands are significantly transforming it. Worldwide, many catalysts are driving this transformation, including emerging supply- and demand-side technologies, cyber security concerns, and aging infrastructures, to name just a few. As the grid transforms and more grid-connected renewable resources complicate reliability, it will be increasingly difficult to meet its futu...

2010-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Transmission Price Risk Management  

Science Conference Proceedings (OSTI)

This report is concerned with the financial risks that arise from the uncertain price of transmission service in restructured or competitive electricity markets. These risks are most severe in markets with locational pricing (LMP), but they also exist in more traditionally organized electricity markets. This report has two main purposes. The first is to review the existing mathematical models of electricity price formation in spot and forward markets that may be helpful as the foundations for developing ...

2006-12-04T23:59:59.000Z

182

Green Transmission Efficiency Initiative  

Science Conference Proceedings (OSTI)

As a consequence of escalating interest in the environment and climate changea national focus on energy efficiency, and growing electricity demandthe time is right to assess energy efficiency from both an end-use perspective as well as across the utility value chain, from generation, to transmission, to distribution. The reduction of our carbon footprint and increasing the role of renewable energy are an important part of the strategy for the greening for electric energy supply. As a result, efficient po...

2009-07-31T23:59:59.000Z

183

Microsoft Word - WWTR_FONSI05162011.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Finding of No Significant Impact May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Finding of No Significant Impact Walla Walla-Tucannon Transmission Line Rebuild Project DEPARTMENT OF ENERGY Bonneville Power Administration Finding of No Significant Impact and Floodplain Statement of Findings DOE EA-1731 Summary: Bonneville Power Administration (BPA) announces its environmental findings on the Walla Walla-Tucannon River Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Walla Walla-Tucannon River 115- kilovolt (kV) transmission line, which was built in 1940. The 47-mile-long transmission line is

184

WestConnect Transmission Product  

NLE Websites -- All DOE Office Websites (Extended Search)

WestConnect Transmission Product Federal Register Notices Customer Notifications Customer Comments Approved Rate Order FERC Confirmation...

185

Transmission eigenvalues for elliptic operators  

E-Print Network (OSTI)

A reduction of the transmission eigenvalue problem for multiplicative sign-definite perturbations of elliptic operators with constant coefficients to an eigenvalue problem for a non-selfadjoint compact operator is given. Sufficient conditions for the existence of transmission eigenvalues and completeness of generalized eigenstates for the transmission eigenvalue problem are derived. In the trace class case, the generic existence of transmission eigenvalues is established.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-07-03T23:59:59.000Z

186

Electricity Transmission and Distribution Technologies ...  

Electricity Transmission and Distribution Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research ...

187

Transmission Planning | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to...

188

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

B. Kirby. 2001. Transmission Planning for a Restructuringindustry_issues/energy_infrastructure/transmission/transmission_hirst.pdf Joskow, P.L. 2005a. “Transmission

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

189

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theMontana-Alberta Tie 230 kV Transmission Line: TransmissionNorthern California Transmission Line Project, Technical

Mills, Andrew D.

2009-01-01T23:59:59.000Z

190

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

191

Bulk Power Transmission Study  

E-Print Network (OSTI)

"Texans now have a choice. We can become more efficient and maintain our standard of living, or we can continue business as usual and watch our standard of living erode from competition from other regions. In the past, except for improving reliability, there was no need for a strong transmission system. When Texas generation was primarily gas fueled, the extensive natural gas pipeline network moved energy easily within the state. In recent years two things have changed: 1. Electric utilities have made extensive investment in lignite, coal, and nuclear plants and, 2. Improvements in gas turbine technology and the removal of institutional barriers has encouraged cogeneration at many of our energy intensive process industries. This energy diversity means that there are now significant differences in energy costs between units. The variable costs of generation of power can vary between units by a ratio of 2 or 3 to 1 and this difference will be accentuated when energy costs rise (and they will; it’s a question of when, not if). The potential for costs savings by optional dispatching of the entire interconnected system are greater than ever before as demonstrated by the PUC's Bulk Power Transmission Study. And the potential can be enhanced with added transmission system investment. Cogeneration and small power production has proven to be the most cost effective way for Texas to add additional generating capacity needed to supply an economy that is starting to rebound and to replace old, obsolete power plants. The freedom to locate these facilities at the fuel source or at the site of large thermal demand makes real economic and environmental sense. The use of renewable or waste fuels allows something that would otherwise be wasted to contribute to our economy. Fossil fuels that are displaced can be redirected to another use or consumed for future benefit. By integrating a gas turbine generator with a. process plant, the natural gas required for producing electricity can be reduced by 40% below that required for a combined cycle. The heat rejected from a gas turbine, combined cycle, or steam plant can be redirected to a process use that contributes to our economy by producing something of value to world markets. By contrast a conventional power plant is paid for by the rate payers and consumes Texas natural resources and therefore is a burden rather than an enhancement to our economy. The optimal location of facilities are possible only if there is an adequate transmission system. Utility, consumer and industry must cooperate to improve our transmission system for the benefit of all Texas. The Texas Public Utilities Commission has taken the lead in promoting efficiency by requiring transmission wheeling between qualifying facilities and electric utilities. Several cogeneration facilities have been constructed as a result. In order to encourage small power production, the rule needs to be expanded to include projects interconnected with distribution systems. Most renewable resource projects are relatively small and cannot afford the cost of a high voltage interconnect, and yet their characteristics match a baseload need. The ability to wheel power to a utility that needs base load power from a distribution level interconnection is essential to development of these smaller projects."

John, T.

1988-09-01T23:59:59.000Z

192

EA-1912: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1912: Draft Environmental Assessment Midway-Benton No. 1 Rebuild Project Benton County, WA This EA evaluates the potential environmental impacts of a proposal to rebuild its 115-kilovolt(kV) wood-pole Midway-Benton No. 1 transmission line and the BPA-owned portion of the 115-kV wood-pole Benton-Othello No. 1 transmission line. The lines are aging and require replacing wood-pole structures and other components of the transmission line. The Midway-Benton No. 1 and Benton-Othello No. 1 transmission lines currently follow the 230-kV steel Midway-Benton No. 2 transmission line. At this time, BPA is not proposing any work on the Midway-Benton No. 2 transmission line. Consolidated Draft PEA_5-10-12 More Documents & Publications

193

Microsoft Word - Ch1_PN_040611km  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bandon-Rogue Transmission Line Bandon-Rogue Transmission Line Rebuild Project Finding of No Significant Impact May 2011 This page left intentionally blank. Bonneville Power Administration 1 Bandon-Rogue Transmission Line Rebuild Project DEPARTMENT OF ENERGY Bonneville Power Administration Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE EA-1739 Summary: Bonneville Power Administration (BPA) announces its environmental findings on the Bandon-Rogue Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Bandon-Rogue 115-kilovolt (kV) transmission line. The 46-mile-long transmission line is located in Coos and Curry counties in Oregon, extending from the city of Bandon to near Nesika Beach.

194

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

195

NREL: Transmission Grid Integration - Publications  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

196

Transmission SEAB Presentation | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission SEAB Presentation Transmission SEAB Presentation Transmission SEAB Presentation More Documents & Publications Proceedings of the March 25-26, 2009 Conference for the...

197

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

stability  analysis of transmission and distribution Voltage Recovery, NERC Transmission Issues  Subcommitte Air Conditioner Response to Transmission Faults. ” ,” IEEE 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

198

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

differences: models for transmission property rights,” IEEEto solve power transmission network design problems,” IEEES. A. "Network topologies and transmission investment under

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

199

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

Georgia Transmission Corp Place Georgia Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission Yes...

200

A PRECISION ANALOG FIBER OPTIC TRANSMISSION SYSTEM  

E-Print Network (OSTI)

Optical Fibers for Transmission, John Wiley and Sons, 9.Laboratories, Transmission Systems for Communications, BellANALOG FIBER OPTIC TRANSMISSION SYSTEM G. Stover M.S. Thesis

Stover, G.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Definition: Transmission Customer | Open Energy Information  

Open Energy Info (EERE)

Load-Serving Entity, or Purchasing-Selling Entity.1 Related Terms transmission service, transmission lines, transmission line References Glossary of Terms Used in Reliability...

202

Definition: Transmission Owner | Open Energy Information  

Open Energy Info (EERE)

facilities.1 Related Terms Transmission Operatortransmission lines, transmission line, transmission lines References Glossary of Terms Used in Reliability Standards An in...

203

Automated manual transmission clutch controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (9375 Kearney Rd., Whitmore Lake, MI 48189); Reed, Jr., Richard G. (3003 Bembridge, Royal Oak, MI 48073); Rausen, David J. (519 S. Gaylord St., Denver, CO 80209)

1999-11-30T23:59:59.000Z

204

Transmission Workshop | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

205

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

206

EA-1731: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding of No Significant Impact Finding of No Significant Impact EA-1731: Finding of No Significant Impact Walla Walla-Tucannon River Transmission Line Rebuild Project Bonneville Power Administration (BPA) announces its environmental findings on the Walla Walla-Tucannon River Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Walla Walla-Tucannon River 115-kilovolt (kV) transmission line, which was built in 1940. The 47-mile-long transmission line is located in Walla Walla and Columbia counties in Washington, extending from the city of Walla Walla to near the town of Dayton. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Final Environmental Assessment

207

Microsoft Word - Midway-Benton_FONSI_Final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Midway-Benton No. 1 Transmission Line Rebuild Project Midway-Benton No. 1 Transmission Line Rebuild Project U.S. Department of Energy Finding of No Significant Impact (FONSI) and Wetland and Floodplain Statement of Findings DOE/EA-1912 Summary Bonneville Power Administration (BPA), in coordination with the U.S. Department of Energy- Richland (DOE-RL), announces its environmental findings on the Midway-Benton No. 1 Transmission Line Rebuild Project (Proposed Action). The Proposed Action would replace the approximately 28.2-mile-long, 115-kilovolt (kV) Midway-Benton No. 1 transmission line and approximately 11 miles of the 115-kV Benton-Othello No. 1 transmission line between the existing Midway and Benton Substations. All of the Proposed Action would be located on the Hanford Site in Benton County, Washington.

208

EA-1617: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1617: Draft Environmental Assessment Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project Western Area Power Administration, Rocky Mountain Customer Service Region (Western) proposes to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kilovolt (kV) transmission lines, located in Big Horn County, Wyoming and Big Horn and Carbon Counties in Montana and the Basin-Lovell (BA-LV) 115-kV transmission line in Big Horn County, Wyoming. The LV-YT No. 1 and 2 transmission lines parallel each other and are approximately 47 miles in length with termination points at the Yellowtail Substation near Fort Smith, Montana and the Lovell Substation near Lovell, Wyoming. The BA-LV transmission line is approximately 39 miles in length with termination

209

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest...

210

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

211

NREL: Transmission Grid Integration - Webmaster  

NLE Websites -- All DOE Office Websites (Extended Search)

reply. Your name: Your email address: Your message: Send Message Printable Version Transmission Grid Integration Home Issues Projects Research Staff Working with Us Publications...

212

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(including regional diversity, AC-DC transmission and distribution solutions, microgrids, energy storage, and centralized-decentralized control) * Accommodates two-way flows...

213

NREL: Transmission Grid Integration - Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Generation Integration Study Oahu Wind Integration and Transmission SIND Toolkit Electricity Market Design Energy Imbalance Markets Flexible Energy Scheduling Tool for...

214

CX-001118: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-001118: Categorical Exclusion Determination Emergency Wood Pole Replacement at 59 Structures Located Along the Coolidge-Oracle 115-Kilovolt...

215

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-09-28T23:59:59.000Z

216

The interior transmission problem and bounds on transmission eigenvalues  

E-Print Network (OSTI)

We study the interior transmission eigenvalue problem for sign-definite multiplicative perturbations of the Laplacian in a bounded domain. We show that all but finitely many complex transmission eigenvalues are confined to a parabolic neighborhood of the positive real axis.

Hitrik, Michael; Ola, Petri; Päivärinta, Lassi

2010-01-01T23:59:59.000Z

217

EC Transmission Line Materials  

SciTech Connect

The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

Bigelow, Tim S [ORNL

2012-05-01T23:59:59.000Z

218

Chapter 4 Transmission Adequacy | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

219

Duke Energy's Transmission Roadmap Initiative  

Science Conference Proceedings (OSTI)

Duke Energy's Transmission Roadmap Initiative advances a vision for development of a power delivery communications and automation infrastructure. The initiative describes performance of a communications upgrade to substations, implementation of select technologies and applications, and integration of enterprise applications, databases, and systems. This report provides a comprehensive view of Duke's Transmission Roadmap Initiative, with a complete technology assessment, infrastructure overview, and discu...

2009-09-18T23:59:59.000Z

220

Semiclassical transmission across transition states  

E-Print Network (OSTI)

It is shown that the probability of quantum-mechanical transmission across a phase space bottleneck can be compactly approximated using an operator derived from a complex Poincar\\'e return map. This result uniformly incorporates tunnelling effects with classically-allowed transmission and generalises a result previously derived for a classically small region of phase space.

Stephen C. Creagh

2005-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

HVDC power transmission technology assessment  

SciTech Connect

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

222

CX-003092: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

92: Categorical Exclusion Determination 92: Categorical Exclusion Determination CX-003092: Categorical Exclusion Determination Ross-Lexington Number 1 New Access Road Construction: 15/1 to 15/2 CX(s) Applied: B1.13 Date: 06/08/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to conduct access road construction at a specific site along the Ross-Lexington Number 1, 115-kilovolt transmission line. This new access road is needed in order to provide access to transmission structures 15/1 and 15/2. The previous access road is no longer accessible due to property owner restrictions. Unrestricted access to transmission structures is a critical aspect of the Transmission Line Maintenance Program, which helps to insure the safety,

223

EA-1636: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1636: Final Environmental Assessment EA-1636: Final Environmental Assessment EA-1636: Final Environmental Assessment Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project The Bonneville Power Administration (BPA) has proposed replacing wood poles and associated structural components for two of BPA's existing transmission lines that generally share the same transmission line right-of-way - the 115-kilovolt (kV) Albany-Burnt Woods No. 1 transmission line and a portion of the 230-kV Santiam-Toledo No. 1 transmission line, both of which are located in Linn, Benton, and Lincoln Counties, Oregon. DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment (March 2009) More Documents & Publications EA-1636: Mitigation Action Plan EA-1636: Finding of No Significant Impact

224

Microsoft Word - FONSI master.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1591 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Palisades-Goshen Transmission Line Reconstruction Project. The project involves rebuilding the existing Palisades-Goshen 115-kilovolt (kV) transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. BPA has prepared an environmental assessment (DOE/EA-1591) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

225

CX-005383: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

383: Categorical Exclusion Determination 383: Categorical Exclusion Determination CX-005383: Categorical Exclusion Determination Elliot Substation Construction and Transmission Line 43.8kV Transmission Line CX(s) Applied: B4.11 Date: 03/02/2011 Location(s): Elliot, North Dakota Office(s): Western Area Power Administration-Upper Great Plains Region The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, North Dakota to be owned and operated by Western under Western's Valley City to Forman 115-kilovolt (kv)transmission line in addition to 8 miles of new 43.8-kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-005383.pdf More Documents & Publications

226

EA-1644: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Finding of No Significant Impact 4: Finding of No Significant Impact EA-1644: Finding of No Significant Impact Killdeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper MIssouri Generation and Transmission Electric Cooperative (UMGT), has applied to the U.S. Department of Energy Western Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection (Killdeer interconnection) at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission live which would extend about 13 miles northward from Western Killdeer's Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. DOE/EA-1644: Finding of No Significant Impact for the Kildeer to Mountain Transmission Project, Richland County, Montana (06/17/09)

227

EA-1456: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56: Final Environmental Assessment 56: Final Environmental Assessment EA-1456: Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Loveland, Colorado Western Area Power Administration (Western) is proposing to upgrade the existing Cheyenne- Miracle Mile (CH-MM) and Ault-Cheyenne (AU-CH) 115 kilovolt (115-kV ) transmission lines to 230-kV. The proposed project consists of rebuilding these transmission lines and making modifications to Western's existing Miracle Mile, Cheyenne and Ault Substations to accommodate the 230-kV circuits. A new Snowy Range Substation would also be build near Laramie, Wyoming. DOE/EA-1456; Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Western Area Power

228

EA-1731: Mitigation Acton Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1: Mitigation Acton Plan 1: Mitigation Acton Plan EA-1731: Mitigation Acton Plan Walla Walla-Tucannon River Transmission Line Rebuild Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Walla Walla-Tucannon River Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves rebuilding the 47-mile-long 115-kilovolt (kV) transmission line from the existing Walla Walla Substation, located in the city of Walla Walla, Washington, to the existing Tucannon River Substation, located near the town of Dayton, Washington. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Finding of No Significant Impact EA-1731: Final Environmental Assessment

229

Microsoft Word - Creston-Bell FONSI_final_external.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Finding of No Significant Impact Creston-Bell Transmission Line Rebuild Project Department of Energy Bonneville Power Administration Finding of No Significant Impact (FONSI) and Wetland and Floodplain Statement of Findings DOE/EA-4406 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Creston-Bell Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Proposed Action is to rebuild the 53.8-mile-long 115-kilovolt (kV) Creston-Bell transmission line, conduct work on access roads, and remove danger trees. The existing 53.8-mile-long transmission line was built in 1942 and extends east from the existing Creston Substation, located in Lincoln County, Washington, to the existing Bell Substation, located in the city of

230

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

231

PROPOSAL FOR CONTINGENT TRANSMISSION PLANS  

E-Print Network (OSTI)

How should the WECC’s RTEP process develop a 10-year transmission plan based upon transmission studies completed over the past several years? This paper explores the notion of a “plan ” that consists of a package containing a small number of “contingent plans ” that would correspond to a limited number of future states of the world by 2020. The rationale for developing transmission plans on a contingent basis is based on the following observations. Contingencies. Insights from TEPPC transmission planning over the past several years indicate that the demand for future transmission expansion in the West is contingent upon a number of important drivers including: (1) Levels of state renewable portfolio standards (RPS); (2) Development of remote versus local renewable generation; (3) Load growth given DSM policies and economic growth; (4) Policies to reduce greenhouse gas (GHG) emissions; (5) Shifts of innovation and cost competitiveness between wind and solar energy; (6) Advances in distributed generation technologies;

unknown authors

2010-01-01T23:59:59.000Z

232

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

233

Regional Transmission Projects: Finding Solutions  

Science Conference Proceedings (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

234

Energy Transmission and Infrastructure  

SciTech Connect

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

235

NWCC Transmission Case Study III  

DOE Green Energy (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

236

The Cost of Transmission for Wind Energy: A Review of Transmission...  

NLE Websites -- All DOE Office Websites (Extended Search)

Wind Energy: A Review of Transmission Planning Studies Title The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies Publication Type Report Year of...

237

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

Certificates of Need for Transmission Lines to Support theand Preference in Transmission Service. ” Washington, D.C. :Integrating Wind into Transmission Planning: The Rocky

Mills, Andrew D.

2009-01-01T23:59:59.000Z

238

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

low unit transmission costs, there were still numerous studies with high transmission voltages that had much higher unit costs than studies with transmission lines

Mills, Andrew D.

2009-01-01T23:59:59.000Z

239

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

Transmission Planning and Wind Energy. Issue Brief. August.of new transmission for wind energy due to the complex andincreasingly including wind energy in transmission plans. We

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

240

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

such as major transmission lines or large generators, areto the nearest bulk transmission line is the only dedicatedon constrained transmission lines (or conversely, pay

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network (OSTI)

transmission cost barrier for wind energy. A secondary goalfocus on the cost of transmission for wind energy does notincremental cost of transmission for wind energy implied by

Mills, Andrew D.

2009-01-01T23:59:59.000Z

242

SunShot Initiative: Transmission Grid Integration  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

243

Midwest Transmission Workshop I Summary  

SciTech Connect

OAK-B135 The meeting was opened with a review of the purposes of the workshop: (1) Present and discuss key studies and assessments of transmission upgrades, additions and related issues for the upper Midwest, including work that addresses the full range of views on these topics; (2) Understand the various transmission issues in the upper Midwest and discuss options for addressing the issues; and (3) Identify the decision makers and entities that need to play an active role if transmission issues are to be resolved, and agree on next steps for engaging these individuals and organizations through education, outreach, and information dissemination.

Kevin Bryan

2001-05-01T23:59:59.000Z

244

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

245

Transmission Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

246

Scanning/Transmission Electron Microscopes  

NLE Websites -- All DOE Office Websites (Extended Search)

ScanningTransmission Electron Microscopes Nion UltraSTEM 60-100 dedicated aberration-corrected STEM for low- to mid-voltage operation and Enfina EELS Contact: Juan-Carlos Idrobo,...

247

National Electric Transmission Congestion Studies  

Energy.gov (U.S. Department of Energy (DOE))

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission...

248

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

The objective of this project is to reduce capital cost by extending life expectancy of overhead transmission wood structures through inspection and assessment procedures and through aging mitigation techniques and tools.

2005-11-29T23:59:59.000Z

249

Accounting-related transmission issues  

Science Conference Proceedings (OSTI)

Various initiatives have been undertaken by the Federal Energy Regulatory Commission (FERC) to deregulate wholesale electric energy markets. These initiatives have focused on restructuring the transmission systems in the US and recently have culminated in a proposal requiring formation of and participation in regional transmission organizations. The overall form of regulation selected to determine rates for transmission entities as well as underlying regulatory decisions reached on key issues will have profound implications for transmission entities. For example, traditional cost-based regulation would require one set of accounting and reporting rules, while incentive-based regulation may not be subject to those same rules. An overview of some of the major accounting and financial reporting issues that will need to be considered is presented.

Niehaus, M.; Bjorn, P.; Pate, G.

1999-12-01T23:59:59.000Z

250

CX-007750: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-007750: Categorical Exclusion Determination "Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a multiple use request submitted by the City of Longview, Washington, to construct a paved recreational trail (the Highland Trail) for pedestrian and bicycle use on existing BPA transmission line right-of-way in Longview, Washington. The Highland Trail would be located on existing BPA fee-owned right-of-way property along the BPA Longview-Cowlitz Number 1, 115-kilovolt (kV) transmission line corridor. It would be built within a 70-foot-wide Reserve

251

CX-005936: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

936: Categorical Exclusion Determination 936: Categorical Exclusion Determination CX-005936: Categorical Exclusion Determination Erie to Terry Street and Lyons to Longmont Northwest 115 Kilovolt Transmission Line Structure Replacements, Boulder and Broomfield Counties, Colorado CX(s) Applied: B4.6 Date: 05/16/2011 Location(s): Boulder County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western proposes to replace nine existing wood pole H-frame structures along the Erie-Terry Street and Lyons-Longmont Northwest transmission lines between Longmont and Erie, Colorado. These transmission lines occur on private lands in Boulder and Broomfield counties, Colorado. Structure sites are located in and around the city of Longmont, in rural residential areas and in agricultural fields. The structures will be replaced with similar

252

EA-1644: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1644: Final Environmental Assessment EA-1644: Final Environmental Assessment EA-1644: Final Environmental Assessment Kildeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper Missouri Generation and Transmission Electric Cooperative, Inc. (UMGT), has applied to the U.S. Department of Energy (DOE) Western Area Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission line which would extend about 13 miles northward from Western's Killdeer Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. The Pre-Decisional Environmental Assessment was issued, without changes, as the Final Environmental Assessment.

253

Microsoft Word - Creston-Bell MAP_final.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan Creston-Bell Transmission Line Rebuild Project Department of Energy Bonneville Power Administration Mitigation Action Plan DOE/EA-4406 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Creston-Bell Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves rebuilding the 53.8-mile-long 115-kilovolt (kV) transmission line from the existing Creston Substation, located in Lincoln County, Washington, to the existing Bell Substation, located in the city of Spokane, Washington. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental

254

CX-006290: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-006290: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/25/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace all of the aging wood pole transmission line support structures along the Cardwell-Cowlitz No. 1, 115 kilovolt (kV) transmission line. Due to the age of the wood poles, the work is necessary to improve the safety, operation, and reliability of the transmission line. All wooden pole structures, hardware, and support structures will be replaced in the original location. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006290.pdf More Documents & Publications

255

CX-003620: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

620: Categorical Exclusion Determination 620: Categorical Exclusion Determination CX-003620: Categorical Exclusion Determination Structure 57/2 Relocation on the Lovell-Thermopolis 115 Kilovolt Transmission Line CX(s) Applied: B1.3, B4.6 Date: 08/23/2010 Location(s): Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Power Administration proposes to relocate structure 57/2 on the Lovell-Thermopolis transmission line. The structure is presently located on the bank of the Greybull River, which is quickly eroding. The structure will be moved approximately 30 feet north of its present location, within the existing transmission line right-of-way. The structure is located on Wyoming State lands. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003620.pdf More Documents & Publications

256

CX-004892: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

92: Categorical Exclusion Determination 92: Categorical Exclusion Determination CX-004892: Categorical Exclusion Determination Oracle-Tucson Transmission Line Structure Relocation CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to relocate part of its Oracle-Tucson 115 kilovolt transmission line in cooperation with Pima County Department of Transportation for their La Canada Drive roadway expansion (Pima County Project Number 4LCRRI). This project involves removing 17 existing transmission line pole structures, and will furnish and install 17 new monopoles in a new location within Western's right-of-way. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004892.PDF More Documents & Publications

257

Windy Gap Firming Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Windy Gap Firming Project Windy Gap Firming Project Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOE/EIS-0370 (cooperating agency) Western's proposed action is to relocate approximately 3.8 miles of the existing Estes to Lyons 115-kilovolt transmission line, if the Chimney Hollow Reservoir alternative is constructed. The line would be moved outside the area proposed for the reservoir, and Western would ensure the new location would allow the agency to continue to operate and maintain it. Section 2.4.1.4 of the Final Environmental Impact Statement, Volume 1 provides more information on the transmission line relocation proposal. The U.S. Department of the Interior, Bureau of Reclamation is the Lead Agency for the National Environmental Policy Act Review. Cooperating agencies are Western, the U.S. Army Corps of Engineers and Grand County, Colo.

258

Microsoft Word - CX-BadgerCanyon-RichlandNo1_WoodPoles_FY13.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2013 7, 2013 REPLY TO ATTN OF: KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Walker Miller Electrical Engineer - TPCF-W RICHLAND Proposed Action: Wood pole replacements on the Badger Canyon-Richland #1 transmission line PP&A Project No.: 2670 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities. Location: City of Richland, Benton County, WA Transmission Line/ROW Structure # Township Range Section County, State Badger Canyon-Richland #1 4/9 and 4/10 9N 28E 26 Benton, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA, at the expense of the City of Richland, proposes to raise structures 4/9 and 4/10 of the Badger Canyon-Richland #1 115-kilovolt transmission line to

259

EA-1644: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1644: Finding of No Significant Impact EA-1644: Finding of No Significant Impact EA-1644: Finding of No Significant Impact Killdeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper MIssouri Generation and Transmission Electric Cooperative (UMGT), has applied to the U.S. Department of Energy Western Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection (Killdeer interconnection) at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission live which would extend about 13 miles northward from Western Killdeer's Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. DOE/EA-1644: Finding of No Significant Impact for the Kildeer to Mountain

260

CX-005674: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

674: Categorical Exclusion Determination 674: Categorical Exclusion Determination CX-005674: Categorical Exclusion Determination Portland General Electric Overhead Line Crossing of Keeler-Oregon City CX(s) Applied: B4.9 Date: 04/15/2011 Location(s): Willamette Meridian, Oregon Office(s): Bonneville Power Administration Portland General Electric (PGE) is planning to construct an overhead transmission line to tap into their existing Saint Mary?s Substation from their newly built Cornell Substation. PGE?s new 115-kilovolt transmission line would cross over Bonneville Power Administration's (BPA) Keeler-Oregon City # 2 transmission line at the junction of the line and Oregon State Highway 26. Their plan includes installation of a two-pole H-Frame structure to control conductor height at the crossing. BPA is proposing to

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

CX-006296: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6296: Categorical Exclusion Determination 6296: Categorical Exclusion Determination CX-006296: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance and reconstruction activities along existing access roads, both on and off the right-of-way. The work involves approximately 4.7 miles of road reconstruction or improvement work on or leading to the Cardwell-Cowlitz No. 1, 115- kilovolt transmission line right-of-way between Cardwell Substation and structure 7/8. The roadwork is needed to improve access for crews that will be replacing the transmission line support structures within the transmission line corridor.

262

CX-008791: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

791: Categorical Exclusion Determination 791: Categorical Exclusion Determination CX-008791: Categorical Exclusion Determination Western Area Power Administration and Tri-State Generation and Transmission Association, Inc. Fiber Optic Installation Project From Beaver Creek to Big Sandy Substations Morgan, Washington, and Lincoln Counties, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Washington, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) and Tri-State Generation and Transmission Association, Inc. (Tri-State), propose to install fiber optic cable on an existing 66 mile 115-kilovolt transmission line between Beaver Creek and Big Sandy Substations in Morgan, Washington, and Lincoln Counties, Colorado. CX-008791.pdf

263

Transmission Structure Foundation Design Guide  

Science Conference Proceedings (OSTI)

This guide contains the most current and comprehensive information for the design of foundations for overhead line structures. The guide covers the complete transmission structure foundation design process from the subsurface investigations and design of the foundations, to the construction and inspection of the foundation. Reference documents to assist transmission structure foundation designers in the development of specifications such as for subsurface investigations and foundation construction ...

2012-11-28T23:59:59.000Z

264

Transmission Valuation and Cost Recovery  

Science Conference Proceedings (OSTI)

This technical update provides information on the status of the electric power industry regarding the economic valuation of transmission projects. Such valuations became critical with the introduction of economic transmission projects in the context of competitive electricity markets. Economic valuation is also becoming increasingly important for traditional reliability upgrades, because of the need for consistency in cost allocations between the two types of upgrades. The year 2005 has brought significa...

2005-12-22T23:59:59.000Z

265

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

Transmission and distribution infrastructures throughout the world are aging. As such, inspection, assessment, and maintenance of existing facilities have become increasingly important topics. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance program for transmission line wood structures to help utilities develop and refine individual maintenance programs. The report is part of a broader multi-year effort by EPRI to develop a comprehensive handb...

2006-09-28T23:59:59.000Z

266

Ultra-Long-Haul WDM transmission systems  

Science Conference Proceedings (OSTI)

This paper discusses the key transmission issues and design considerations for ultra-long-haul WDM systems. The key enabling technologies for the current generation of ultra-long-haul WDM transmission are described. Noise analysis and transmission modelling ...

Y. R. Zhou; A. Lord; S. R. Sikora

2002-10-01T23:59:59.000Z

267

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

case study of U.S. transmission line siting,” Energy Policy,Dual variable on transmission line k’s power flownetwork branches (transmission lines), it is possible to

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

268

DOE Affirms National Interest Electric Transmission Corridor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis...

269

DOE National Interest Electric Transmission Corridors Conference  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Interest Electric Transmission Corridors Conference March 29, 2006 Hilton Garden Hotel Chicago, IL William H. Whitehead General Manager, Transmission Strategy PJM...

270

Electricity Transmission Data Needs Focus Group Results  

U.S. Energy Information Administration (EIA)

power, transmission flows within states, the implications of transmission on capacity expansion decisions and costs; age of transformers and other facilities;

271

Electric Power Generation and Transmission (Iowa) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Generation and Transmission (Iowa) Electric Power Generation and Transmission (Iowa) < Back Eligibility Agricultural Industrial Investor-Owned Utility MunicipalPublic...

272

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency...

273

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Gallery < Transmission Jump to: navigation, search PhotoGalleryHeader.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada...

274

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

American Transmission Systems Inc Place Ohio Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes References EIA...

275

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

Atlas < Transmission Jump to: navigation, search PermittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California...

276

Interconnection-Wide Transmission Planning Initiative: Topic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas Interconnection...

277

EIS-0285: Transmission System Vegetation Management Program ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission System Vegetation Management Program June 23, 2000 EIS-0285: EPA Notice of Availability of the Final Environmental Impact Statement Transmission System Vegetation...

278

Casablanca Carlos American Electric Power Transmission Owner  

E-Print Network (OSTI)

(Facilitator) Chantal PJM Interconnection Not Applicable Horstmann John Dayton Power & Light Company (The) Transmission Owner Issermoyer John PPL Electric Utilities Corp. dba PPL Utilities Transmission Owner

Pjm Interconnection Llc; Teleconference Webex Participants; Firstenergy Solutions; Corp Transmission Owner; Boltz Jeff; Firstenergy Solutions; Corp Transmission Owner; Fecho Thomas; Indiana Michigan; Power Company; Transmission Owner; Patten Kevin; Company Transmission Owner

2012-01-01T23:59:59.000Z

279

Electric generating or transmission facility: determination of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric generating or transmission facility: determination of rate-making principles and treatment: procedure (Kansas) Electric generating or transmission facility: determination...

280

Definition: Deferred Transmission Capacity Investments | Open...  

Open Energy Info (EERE)

transformers.1 Related Terms transmission lines, transformer, transmission line, sustainability References SmartGrid.gov 'Description of Benefits' An inl LikeLike UnlikeLike...

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

NREL: Transmission Grid Integration - Eastern Renewable Generation...  

NLE Websites -- All DOE Office Websites (Extended Search)

transmission? How does geographic diversity of wind reduce wind integration costs? How do offshore and onshore wind power compare? What transmission is needed to facilitate higher...

282

Definition: Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Definition No reegle definition available. Also Known As Firm services Related Terms transmission lines, electricity generation, transmission line, smart grid References ...

283

Definition: Transmission Reliability | Open Energy Information  

Open Energy Info (EERE)

to ensure reliable system operation as system conditions change.1 Related Terms transmission lines, transfer capability, system, transmission line References Glossary...

284

Definition: Transmission Reliability Margin | Open Energy Information  

Open Energy Info (EERE)

system operation as system conditions change.1 Related Terms transfer capability, transmission lines, system, transmission line References Glossary of Terms Used in...

285

Definition: Transmission Constraint | Open Energy Information  

Open Energy Info (EERE)

that may be reached during normal or contingency system operations.1 Related Terms transmission lines, system, contingency, transmission line, element References ...

286

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

which is a cooperating agency in the project. The proposed project would: Rebuild aging and deteriorating transmission lines Reduce the number of linear miles of transmission...

287

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

Transmission Company Jump to: navigation, search Name Michigan Electric Transmission Company Place Michigan Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO...

288

DOE Transmission Capacity Report | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

289

NDN, volume transmission, and self-organization in brain dynamics  

E-Print Network (OSTI)

NDN, VOLUME TRANSMISSION, AND SELF- ORGANIZATION IN BRAINThese systems instantiate volume transmission bynonsynaptic diffusion transmission, in concert with the

Freeman, Walter J III

2005-01-01T23:59:59.000Z

290

Definition: Non-Firm Transmission Service | Open Energy Information  

Open Energy Info (EERE)

available. Also Known As Interruptible Load or Interruptible Demand Related Terms transmission lines, electricity generation, transmission line, firm transmission service,...

291

DOE Transmission System Integration Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

292

Midwest Transmission Workshop III Summary  

DOE Green Energy (OSTI)

OAK-B135 On March 12-13, 2002, the National Wind Coordinating Committee (NWCC), in cooperation with regional stakeholders, held a two-day workshop: Planning for Electrical Transmission Needs in the Upper Midwest. The workshop was the outgrowth of an effort to develop a forum and process for consideration of transmission options that strives for equitable allocation of benefits and impacts among all affected parties. The goal of this workshop was to provide a catalyst for an enhanced, inclusive process for transmission planning with participation of and acceptance by all affected stakeholders. Participants in the meeting included representatives of state and regional regulatory agencies, utilities and power generators, the wind industry, environmental and landowner interests, and other interested parties (see Attachment A for a list of meeting participants).

Kevin Bryan

2003-03-12T23:59:59.000Z

293

The Development of HVDC Transmission System  

Science Conference Proceedings (OSTI)

The ever increasing process of high-voltage high-power fully controlled semiconductor technology has promoted the flexible ac transmission systems ahead significantly. Developments advance both the HVDC power transmission and the flexible ac transmission ... Keywords: converters station, HVDC transmission systems, power electronics

Yang Zhou; Dao Zhuojiang; Yu Fenwang

2012-07-01T23:59:59.000Z

294

Transmission Rights and Market Power James Bushnell  

E-Print Network (OSTI)

of the transmission grid can advantage some competitors at the expense of others. In electricity markets around control of transmission paths. In electricity markets such as California's, even financial transmissionPWP-062 Transmission Rights and Market Power James Bushnell April, 1999 This paper is part

California at Berkeley. University of

295

Principles for interregional transmission expansion  

Science Conference Proceedings (OSTI)

In aiming to facilitate the siting of interregional transmission lines, some basic principles might include an approach where the Federal Energy Regulatory Commission uses a variety of tools to capture the value of new transmission, and thus increase the supply of interregional lines. There also may be opportunities for the Commission to work with localities to reduce resistance to new lines by means of economic incentives. Such a tack has the potential to be more efficient than fighting local opposition in the courts. (author)

Benjamin, Richard

2007-10-15T23:59:59.000Z

296

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

297

Microsoft Word - CX-Chenoweth-Goldendale-Disconnect_FY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Stacie Hensley Project Manager - TEP-TPP-4 Proposed Action: Chenoweth-Goldendale No. 1 disconnect switch project PP&A Project No.: 2,351 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Klickitat County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to construct a new disconnect switch stand and associated line work on its Chenoweth-Goldendale No. 1, 115-kilovolt transmission line adjacent to the BPA Goldendale Substation. The disconnect switch consists of a metal platform on a lattice steel structure supported by four steel legs. Construction of the disconnect

298

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

299

CX-006585: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-006585: Categorical Exclusion Determination Tualatin Hills Park and Recreation District Request for Use of Right-Of-Way for Westside Trail CX(s) Applied: B4.9 Date: 08/25/2011 Location(s): Beaverton, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a request submitted by Tualatin Hills Park and Recreation District (THPRD) to construct portions of their proposed regional trail on existing BPA transmission line right-of-way (ROW) in the City of Beaverton, Oregon. THPRD?s trail sections would be located on portions of existing BPA fee-owned right-of-way property along the BPA Keeler-Oregon City No. 2 and Oregon City Stub 115-kilovolt transmission line corridors, as well as adjacent non-BPA

300

DOE/EA-1636: Finding of No Significant Impact for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project EA (March 2009)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1636 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Albany- Burnt Woods and Santiam-Toledo Pole Replacement Project. This project involves replacing wood pole structures on the existing Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and along a portion of the existing Santiam-Toledo single circuit, 230-kV transmission line. BPA has prepared an environmental assessment (DOE/EA-1636) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

CX-001182: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

82: Categorical Exclusion Determination 82: Categorical Exclusion Determination CX-001182: Categorical Exclusion Determination Access Road Improvement Project for Structure 12/1 of the Snoking Tap to Echo Lake-Monroe Number 1 Transmission Line CX(s) Applied: B1.13 Date: 03/12/2010 Location(s): Snohomish, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to construct a permanent access road to improve vehicle access to the 115 kilovolt Snoking Tap to Echo Lake-Monroe Number 1 Transmission Line. The project would involve constructing an approximately 760-foot long by 14-foot wide access road to structure 12/1. The project would also involve the installation of three culverts to help preserve the site's existing hydrology and increase the longevity of the proposed access road. Project activities would occur in

302

CX-009227: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27: Categorical Exclusion Determination 27: Categorical Exclusion Determination CX-009227: Categorical Exclusion Determination Beaver Creek- Big Sandy 115 Kilovolt Transmission Line Structure Replacements - Last Chance Fire CX(s) Applied: B4.13 Date: 08/31/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) replaced approximately 55 structures on an existing l 0 mile section of the 115-k V transmission line between Beaver Creek and Big Sandy Substations in Washington County, Colorado. The Last Chance fire which began on June 25, 2012, destroyed the existing structures beyond repair. Western crews responded to this emergency and rebuilt the downed power lines to restore electrical service. The maintenance crews used existing access roads and no grading or

303

CX-005845: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5845: Categorical Exclusion Determination 5845: Categorical Exclusion Determination CX-005845: Categorical Exclusion Determination Selected Wood Pole Replacement and Minor Access Road Maintenance Along the Grand Coulee-Creston Transmission Line at Miles 14, 15, 21 and 28 CX(s) Applied: B1.3 Date: 05/05/2011 Location(s): Lincoln County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the Grand Coulee-Creston #1 115-kilovolt transmission line. The structures scheduled for replacement are identified as 14/6, 14/8, 15/1, 21/9 and 28/7. Replacement will be in-kind and will utilize the existing holes to minimize ground disturbance.

304

Microsoft Word - L0295-StJohnsTap-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joyce Vaughn Project Engineering - TELP-TPP-3 Proposed Action: L0295 - St. Johns-St. Helens #1 Interconnection Project Budget Information: Work Order #004866, Task 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Columbia County, Oregon (T4N, R1W, Section 7) Proposed by: Bonneville Power Administration (BPA) and Columbia River PUD (CRPUD) Description of the Proposed Action: BPA proposes to install a new tap and associated disconnect structures on BPA's St. Johns-St. Helens #1 115-kilovolt (kV) transmission line to

305

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 27930 of 28,904 results. 21 - 27930 of 28,904 results. Download CX-008782: Categorical Exclusion Determination Danger Tree Management on North Gunnison to Skito 115 Kilovolt Transmission Line Gunnison County, Colorado CX(s) Applied: B1.3 Date: 07/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008782-categorical-exclusion-determination Download CX-009234: Categorical Exclusion Determination Hesperus- Montrose 345 Kilovolt Transmission Line Private Lands Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/13/2012 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-009234-categorical-exclusion-determination

306

CX-005580: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

580: Categorical Exclusion Determination 580: Categorical Exclusion Determination CX-005580: Categorical Exclusion Determination Sidney to Sterling Transmission Line Structure Replacement, Logan County, Colorado CX(s) Applied: B4.6 Date: 12/22/2010 Location(s): Logan County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western proposes to replace approximately 22 existing wood pole H-frame structures along the Sidney to Sterling 115-kilovolt transmission line between the Sterling Substation and Peetz, Colorado. The existing structures would be replaced with structures that are approximately 10 feet taller to ensure proper electrical clearances. The new structures would look nearly identical to the replaced structures. The work includes removing existing structures and hardware, dismantling old structures,

307

Microsoft Word - CX-Cardwell-Cowlitz2011AccessRoad_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance on or leading to the Cardwell-Cowlitz No.1, 115-kilovolt (kV) transmission line. Budget Information: Work Order #00281014 PP&A Project No.: 2020 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on or leading to the Cardwell-Cowlitz No. 1, 115-kV transmission line right-of-way.

308

CX-007515: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15: Categorical Exclusion Determination 15: Categorical Exclusion Determination CX-007515: Categorical Exclusion Determination Bucknam Temporary Tap, Natrona County, Wyoming CX(s) Applied: B4.6 Date: 12/15/2011 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration is entering into an agreement with Tri-State Generation and Transmission to provide a temporary tap with mobile equipment to be placed until a facility study can be done for permanent construction. This Categorical Exclusion is for the installation of a temporary mobile transformer within Western's right of way (ROW) easement on Bureau of Land Management land along the Casper-Arminto 115 kilovolt transmission line 50 feet north of structure 23/8. The project will require a temporary tap, pad location, temporary fencing around the

309

Microsoft Word - CX-Sacajawea-SunHarborCascadeSteelTapPropertyTransferFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2012 20, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Acquisition and Disposition of Property Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.24, Property transfers. Location: Walla Walla County, WA; Yamhill County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to dispose of one property and acquire another property in its service territory: Sacajawea-Sun Harbor: BPA proposes to dispose of 2.02 miles of its Sacajawea-Sun Harbor 115-kilovolt (kV) transmission line, associated easement rights, and its Sun Harbor Substation to the Columbia Rural Electric Association (CREA). The transmission line and substation are

310

Microsoft Word - CX-Cardwell-Cowlitz2011WoodPoles_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of all aging wood pole transmission line support structures along the Cardwell-Cowlitz No. 1, 115-kilovolt (kV) transmission line Budget Information: Work Order #00279267 PP&A Project No.: 2021 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights of way, infrastructures (e.g.. structures)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area is located along Bonneville Power Administration's (BPA)

311

Microsoft Word - CX-Kalispell-KerrMile15-16AccessRoadImprovementFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Joe Johnson Project Manager - TELF-TPP-3 Proposed Action: Access road improvement for the Kalispell-Kerr #1, 115-kilovolt (kV) transmission line PP&A Project No.: 2474 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance, B1.13 Pathways, short access roads, and rail lines Location: Township 26 North, Range 21 West, Section 13 and 24, Flathead County, MT. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to perform access road maintenance on several segments of the access road for the Kalispell-Kerr #1, 115-kV transmission line. Work includes reconstruction and drainage enhancements on 5000 feet of road beginning at structure

312

CX-008719: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19: Categorical Exclusion Determination 19: Categorical Exclusion Determination CX-008719: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Naselle-Tarlett No. 1, Holcomb- Naselle No. 1, and Raymond-Willapa River No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. crossarms, insulators, and guy anchors) at existing H-frame structures along the subject transmission lines in Pacific County, Washington. Microsoft Word - CX-PacificCoWAWoodPolesFY12_WEB.doc More Documents & Publications CX-006794: Categorical Exclusion Determination EIS-0285-SA-118: Supplement Analysis

313

CX-006889: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-006889: Categorical Exclusion Determination Bristol to Groton Transmission Line Upgrade Project CX(s) Applied: B4.11 Date: 10/11/2011 Location(s): South Dakota Office(s): Western Area Power Administration-Upper Great Plains Region The Western Area Power Administration (WAPA) Bristol to Groton 115 kilovolt (kV) transmission line is to be upgraded in association with the Just Wind Napoleon Wind Farm. The Just Wind Napoleon Wind Farm will produce 367 megawatts (MW) when complete. Plans call for production of 100 MW at the end of 2010, with the remaining 267 MW coming online at a later date. The existing 115-kV conductor will need to be replaced with a new 795 MCM (thousands of circular mills) 115-kV conductor line before the full 367 MW

314

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 11, 2010 March 11, 2010 CX-007156: Categorical Exclusion Determination New Waddell-Raceway-Westwing Structure Replacement CX(s) Applied: B4.6, B4.13 Date: 03/11/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region February 18, 2010 CX-007167: Categorical Exclusion Determination Rogers-Coolidge Danger Tree Removal CX(s) Applied: B1.3 Date: 02/18/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region December 31, 2009 CX-001121: Categorical Exclusion Determination Transmission Line Structure Relocation of Existing Oracle-Tucson 115-kilovolt Transmission Line CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

315

CX-008709: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09: Categorical Exclusion Determination 09: Categorical Exclusion Determination CX-008709: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. crossarms, insulators, and guy anchors) at existing H-frame structures along the subject transmission line in Mason and Jefferson counties, Washington. Microsoft Word - CX-Shelton-Fairmount-WoodPolesFY12_WEB.doc More Documents & Publications CX-008693: Categorical Exclusion Determination CX-008708: Categorical Exclusion Determination

316

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22, 2011 22, 2011 CX-006583: Categorical Exclusion Determination Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration August 22, 2011 CX-006580: Categorical Exclusion Determination Wood Pole Replacement Along the Grand Coulee-Okanogan #2 115-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Grant County, Washington Office(s): Bonneville Power Administration August 18, 2011 EA-1728: Draft Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington August 15, 2011 EIS-0245-SA-03: Supplement Analysis Management of Spent Nuclear Fuel from the K Basins at the Hanford Site,

317

CX-007172: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07172: Categorical Exclusion Determination 07172: Categorical Exclusion Determination CX-007172: Categorical Exclusion Determination Tucson-Apache Erosion Repair & Cactus Relocation CX(s) Applied: B1.3 Date: 02/23/2011 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to construct a new access road along the existing Tucson-Apache 115-kilovolt (kV) transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-25/2 & 25/3- 26/5. We will be installing two gates to limit right-of-way access from Houghton Road. We

318

CX-006794: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-006794: Categorical Exclusion Determination Naselle-Tarlett Nature Conservancy Access Road Funding CX(s) Applied: B1.13 Date: 09/12/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration In 2010, the Nature Conservancy (property owner), in accordance to agreements with Bonneville Power Administration (BPA), abandoned several sections of legal and usable access roads leading to BPA?s Nasselle-Tarlett 115-kilovolt transmission line corridor. The Nature Conservancy has constructed new, more environmentally friendly sections of access roads on their property to provide BPA alternate access the transmission line right-of-way and structures. BPA proposes to purchase easement rights and provide funding to partially cover construction costs of the new road

319

Microsoft Word - CX_Memo_Lex-Del  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 2013 0 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Cowlitz County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to transfer ownership of a portion of its existing Lexington-Delameter 115-kV transmission line to Cowlitz County Public Utility District No.1 (Cowlitz PUD) in Cowlitz County, WA. BPA would sell the first four spans of the line, from BPA's Lexington Substation to approximately 2,000 feet northwest to structure 30/8,

320

CX-007991: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

991: Categorical Exclusion Determination 991: Categorical Exclusion Determination CX-007991: Categorical Exclusion Determination Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission lines. Microsoft Word - CX-Drummond-MacksInn_WoodPoleReplacementFY12_WEB.doc More Documents & Publications CX-009709: Categorical Exclusion Determination EIS-0267: Final Environmental Impact Statement EIS-0285-SA-82: Supplemental Analysis

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Notice of Intent to Prepare an Environmental Impact 1: Notice of Intent to Prepare an Environmental Impact Statement EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho BPA intends to prepare an EIS in accordance with the National Environmental Policy Act (NEPA) on the proposed construction, operation, and maintenance of a 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new BPA substation would be called Hooper Springs Substation and would be located adjacent to PacifiCorp's existiog 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. The new 115-kV single-circuit BP A transmission line would exlend generally north and east from these

322

CX-000603: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-000603: Categorical Exclusion Determination Baseload Energy Inc. Brasada-Harney 115-kilovolt Transmission Line Project CX(s) Applied: B4.6 Date: 02/04/2010 Location(s): Deschutes County, Oregon Office(s): Bonneville Power Administration The proposed project is a result of an interconnection request that was made by Baseload Energy, Inc., to interconnect onto the Federal Columbia River Transmission System. This interconnection request would accommodate a High Altitude Wind Generation Turbine that would generate up to 8 megawatts of harvested wind power. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000603.pdf More Documents & Publications CX-010589: Categorical Exclusion Determination CX-005844: Categorical Exclusion Determination

323

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 11850 of 26,764 results. 41 - 11850 of 26,764 results. Download CX-008386: Categorical Exclusion Determination Danger Tree Management on Bridgeport to Sydney 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/11/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008386-categorical-exclusion-determination Download CX-008396: Categorical Exclusion Determination Danger Tree Management on Shiprock-Four Corners 345 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/13/2012 Location(s): New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008396-categorical-exclusion-determination Article DOE Selects Projects to Advance Technologies for the Co-Production

324

EIS-0457: Record of Decision | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Record of Decision Record of Decision EIS-0457: Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR BPA decided to implement the Proposed Action Alternative from the Albany-Eugene 115-kilovolt (kV) No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement (EIS) (DOE/EIS-0457, March 2012). The Proposed Action Alternative, which was identified as the agency's preferred alternative in the Final EIS, consists of rebuilding a 32-mile section of the existing Albany-Eugene 115-kV transmission line that extends from the Albany Substation in the City of Albany in Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. EIS-0457-ROD-MAP-2012.pdf More Documents & Publications EIS-0457: Mitigation Action Plan EIS-0457: Final Environmental Impact Statement

325

CX-005418: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18: Categorical Exclusion Determination 18: Categorical Exclusion Determination CX-005418: Categorical Exclusion Determination Birch Creek Radio Tower CX(s) Applied: B4.6 Date: 03/07/2011 Location(s): Bonneville County, Idaho Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to install a new 50-foot radio tower within the existing Birch Creek Radio Station property in order to communicate with Utah Associated Municipal Power System?s (UAMPS) new 100-megawatt Horse Butte Wind Power Generating Facility. BPA would also install telemetry and communication equipment within UAMPS?s Horse Butte control house. Electrical generation produced from the Horse Butte Wind project would interconnect into BPA?s transmission system via a tap between towers 31/6 and 31/7 of BPA?s Palisades-Goshen 115-kilovolt transmission

326

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 1, 2013 April 1, 2013 CX-010106: Categorical Exclusion Determination Flaming Gorge Microwave Site Communications Building Access Road Repairs CX(s) Applied: B1.3 Date: 04/01/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 26, 2013 CX-010105: Categorical Exclusion Determination Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region January 23, 2013 CX-009804: Categorical Exclusion Determination Kersey West Switching Station Interconnection Kiowa Creek - Welc 115 Kilovolt Transmission Line CX(s) Applied: B4.1, B4.11 Date: 01/23/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

327

CX-003237: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

237: Categorical Exclusion Determination 237: Categorical Exclusion Determination CX-003237: Categorical Exclusion Determination Chehalis-Raymond Number 1 2010 Line Rebuild CX(s) Applied: B4.6 Date: 07/19/2010 Location(s): Lewis County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to rebuild the first 19 miles of the Chehalis-Raymond Number 1, 115 kilovolt transmission line from Chehalis Substation to Pe Ell Substation. The subject transmission line has reached its designed service age and needs to be replaced to insure system reliability and the safe operation. The proposed project includes replacement of all wood pole support structures, electrical conductor, support guys, and associated hardware. Additionally, some minor road maintenance will be completed to gain access to structures where road

328

CX-003789: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

789: Categorical Exclusion Determination 789: Categorical Exclusion Determination CX-003789: Categorical Exclusion Determination Grandview-Red Mountain Number 1 Proposed Transmission Line Interconnection CX(s) Applied: B4.6 Date: 09/08/2010 Location(s): Benton County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to construct a 115-kilovolt (kV) tap point consisting of two 115-kV sectionalizing switches with loop breaking capability on the Grandview-Red Mountain Number 1 transmission line between structures 18/1 and 18/2 in order to accommodate an interconnection request by Benton Rural Electric Association (REA) for their Acord Substation development project. BPA would be responsible for revenue metering at the new Acord Substation, and for the tap, which would

329

CX-002774: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74: Categorical Exclusion Determination 74: Categorical Exclusion Determination CX-002774: Categorical Exclusion Determination Vera Tap to Trentwood Valley Way #1 Project CX(s) Applied: B4.6, B4.13 Date: 06/03/2010 Location(s): Trentwood, Washington Office(s): Bonneville Power Administration Bonneville Power Administration proposes to add a disconnect switch and 2 wood poles between two existing pole structures on its Vera Tap to Trentwood Valley Way Number 1, 115-kilovolt transmission line in eastern Washington. The project will improve system reliability for its customer, Vera Water and Power, by allowing better sectionalizing of the transmission line for maintenance. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-002774.pdf More Documents & Publications CX-005009: Categorical Exclusion Determination

330

CX-007142: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07142: Categorical Exclusion Determination 07142: Categorical Exclusion Determination CX-007142: Categorical Exclusion Determination Electrical District 5 - Saguaro Structure Maintenance CX(s) Applied: B1.3 Date: 02/09/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kilovolt Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures because the wood poles failed stability tests, cross arms are beyond repair and arms and braces need to be changed to a more modern

331

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 30220 of 31,917 results. 11 - 30220 of 31,917 results. Download CX-007991: Categorical Exclusion Determination Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007991-categorical-exclusion-determination Download CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007999-categorical-exclusion-determination Download CX-008151: Categorical Exclusion Determination

332

Transmission System Reliability Performance Metrics Requirements  

Science Conference Proceedings (OSTI)

Transmission availability has become the significant indicator of overall transmission system operational health, due to increased utilization of the transmission system, growth of deregulated energy wholesale markets, and decreased investment in new transmission assets. Availability trends reflect the increasing dependence upon transmission assets from a technical and market perspective. Presently availability metrics lack comparability due to the non-standardization of underlying data collection method...

2003-12-12T23:59:59.000Z

333

Underground Transmission Systems Reference Book  

Science Conference Proceedings (OSTI)

The Underground Transmission Systems Reference Book covers all stages of cable system design and operation, from initial planning studies to failure analysis. It contains contributions from many of the industry's experts and represents practices from all parts of the United States.

1993-03-01T23:59:59.000Z

334

Power superconducting power transmission cable  

DOE Patents (OSTI)

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

335

Transmission System SQRA Assessment Methods  

Science Conference Proceedings (OSTI)

Market conditions and increasingly stringent regulatory requirements have focused attention on metrics that quantify the Security, Quality, Reliability, and Availability (SQRA) of transmission systems. This report summarizes the state-of-the-art in performance metrics, provides four case studies of their use, and discusses future trends in reliability metrics, congestion metrics, and benchmarking.

2009-07-31T23:59:59.000Z

336

Boundary stabilization of transmission problems  

E-Print Network (OSTI)

We study the transmission problem in bounded domains with dissipative boundary conditions. Under some natural assumptions, we prove uniform bounds of the corresponding resolvents on the real axis at high frequency, and as a consequence, we obtain free of eigenvalues regions. As an application, we get exponential decay of the energy of the solutions of the correpsonding mixed boundary value problems.

Fernando Cardoso; Georgi Vodev

2009-10-20T23:59:59.000Z

337

Transmission Access Charge Informational Filing  

E-Print Network (OSTI)

of any new Participating Transmission Owner (“Participating TO”) during the proceeding six months or (2) changes to Transmission Revenue Requirements of any of the Participating TOs. 1 Because the Access Charges are determined through a formula rate mechanism, these semi-annual adjustments take place automatically. In the enclosed informational filing, the ISO is providing notice regarding the updated Access Charges that reflect the charges that will be in effect beginning January 1, 2002 in accordance with the formula rate. The adjusted charges are based on the modified Transmission Revenue Requirements, both High Voltage and Low Voltage as a result of: (1) the Offer of Settlement accepted by the Commission in Pacific Gas & Electric Company’s (“PG&E”) Docket No. ER01-66-000, (2) San Diego Gas and Electric Company’s supplemental surcharge accepted, subject to refund, in Docket No. ER01-3074-000, and (3) the annual adjustment to the Transmission Revenue Balancing Account (“TRBA”) of the Participating TOs. 1 Capitalized terms not otherwise defined herein are defined in the Master Definitions

unknown authors

2001-01-01T23:59:59.000Z

338

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

339

Efficiency Benefits of EHV AC Transmission and Overlays in Interregional Transmission Expansion Planning  

Science Conference Proceedings (OSTI)

In the United States, transmission expansion planning historically focused on addressing local utility transmission needs. In the mid-to-late 1990s, the focus shifted to encompass regional transmission expansion, primarily driven by Federal Energy Regulatory Commission (FERC) mandates on open transmission access and emergence of regional transmission organizations. In recent years, three drivers have elevated transmission expansion planning to a higher, interregional level. These drivers are the ...

2012-11-29T23:59:59.000Z

340

NREL: Transmission Grid Integration - Webinars  

NLE Websites -- All DOE Office Websites (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

DOE Electricity Transmission System Workshop  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

342

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

343

Midwest Transmission Workshop II Summary  

DOE Green Energy (OSTI)

OAK-B135 After introductions of all participants, Abby Arnold, RESOLVE, reviewed the purpose of the meeting and the agenda. The purpose of the workshop was to share the results of the Midwest Independent System Operator (MISO) scenario development for wind and other fuel sources and the corresponding implications for transmission throughout the MISO control area. The workshop agenda is included in Attachment A.

Kevin Bryan

2002-12-05T23:59:59.000Z

344

Guide for Transmission Line Grounding  

Science Conference Proceedings (OSTI)

Electrical utilities have a duty to provide effective grounding for managing steady-state and fault currents, whether near a large generating station or at a remote distribution pole ground. For transmission lines, this imperative is usually met with investment in overhead ground wires and grounding electrodes. Effective grounding at each tower improves reliability8212by providing low path impedance to lightning strokes8212and contributes to safety. However, the fundamental physical parameters in ground ...

2007-12-20T23:59:59.000Z

345

High current pulse transmission cable  

DOE Patents (OSTI)

This invention is comprised of a transmission cable for carrying high current pulses in which an even numbered plurality of electrical conductors surrounds a central ground conductor. Each electrical conductor is connected so that it at any instant in time it will carry current of opposite polarity to the polarity carried by adjacent conductors. This arrangement cancels practically all of the external fields generated by current in the conductors.

Parsons, W.M.

1990-09-28T23:59:59.000Z

346

Flexible and Strategic Transmission Planning  

Science Conference Proceedings (OSTI)

This update describes two separate but related planning frameworks developed for this project: 1) balancing of reliability and economics in transmission planning and 2) consideration of the need for operational flexibility in planning. Projects that improve reliability can also improve economics, and vice versa. The challenge is in achieving the reliability goals with as much economic benefit as possible, in other words, balancing the reliability and economic goals without compromising either. A method o...

2011-12-22T23:59:59.000Z

347

Coiled transmission line pulse generators  

DOE Patents (OSTI)

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

348

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network (OSTI)

in calculating the unit cost of wind energy transmissionimpacts of the cost of transmission for wind energy. Only inj = Transmission cost per unit of wind energy weighted by

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

349

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

350

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

351

Wireless power transmission for medical applications  

E-Print Network (OSTI)

We studied the wireless power transmission capabilities of microwave through human skin-tissue. Microwave transmission through simulated human skins was tested with rectenna array as a power receiver located under the ...

Payne, Joshua E.

352

A Computer Package for Transmission Line Analysis  

Science Conference Proceedings (OSTI)

A computer program, LIGNE, has been developed as a comprehensive teaching aid for the section on transmission line theory in an electromagnetics course. The program assists the student in the analysis of transmission lines, enabling him to quickly assess ...

Georges-Andre Chaudron; Manfred Nachman

1987-11-01T23:59:59.000Z

353

Transmission Expansion Planning with Re-design  

E-Print Network (OSTI)

Expanding an electrical transmission network requires heavy investments ... Long term transmission expansion planning determines, over an horizon of 10 or more years, ... generation sites are usually far away from the consumption centers.

354

EEI/DOE Transmission Capacity Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

355

Directional Reactive Power Ground Plane Transmission  

Directional Reactive Power Ground Plane Transmission Technology Summary ... The invention can transmit electrical power through the surface of the ...

356

Average transmission probability of a random stack  

E-Print Network (OSTI)

The transmission through a stack of identical slabs that are separated by gaps with random widths is usually treated by calculating the average of the logarithm of the transmission probability. We show how to calculate the average of the transmission probability itself with the aid of a recurrence relation and derive analytical upper and lower bounds. The upper bound, when used as an approximation for the transmission probability, is unreasonably good and we conjecture that it is asymptotically exact.

Yin Lu; Christian Miniatura; Berthold-Georg Englert

2009-07-31T23:59:59.000Z

357

High Resolution Transmission Microscopy Characterization of an ...  

Science Conference Proceedings (OSTI)

High Resolution Transmission Microscopy Characterization of an Oxide ... Line Dislocation Dynamics Simulation of fundamental dislocation properties in ...

358

Flexible Transmission in the Smart Grid  

E-Print Network (OSTI)

low load levels there can be situations where the capacitive component of the transmission line causes voltage

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

359

Alternative Transmission Technologies for Joint Planning Studies  

Science Conference Proceedings (OSTI)

This report describes a detailed analysis of joint transmission planning needs and capabilities, including an assessment of current research in the area. The report has value as a starting point and reference for transmission planners engaged in joint planning exercises because it focuses on technologies that could facilitate joint transmission planning of a bulk power grid. A joint planning exercise involves the collaboration of multiple transmission planning groups that may each have ...

2013-12-09T23:59:59.000Z

360

Advantages of Integrating Precession Scanning Transmission ...  

Science Conference Proceedings (OSTI)

Presentation Title, Advantages of Integrating Precession Scanning Transmission Electron Microscopy in the Characterization of Metallic Materials. Author(s) ...

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Transmission Electron Microscopy Studies on Lithium Battery ...  

Science Conference Proceedings (OSTI)

About this Abstract. Meeting, 2012 TMS Annual Meeting & Exhibition. Symposium , Energy Nanomaterials. Presentation Title, Transmission Electron Microscopy ...

362

Exploration of Resource and Transmission Expansion Decisions  

E-Print Network (OSTI)

Exploration of Resource and Transmission Expansion Decisions in the Western Renewable Energyin.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, Permitting, Siting and Analysis Division #12;Resource and Transmission ExpansionResource and Transmission Expansion Decisions in WREZ

363

Transportation Center Seminar........ "Proactive Transmission Planning in  

E-Print Network (OSTI)

Transportation Center Seminar........ "Proactive Transmission Planning in Electricity Networks of the biggest problems of actual power-systems transmission planning is its reactive nature. We formulate-systems transmission planning, generation investment, and market operation decisions and propose a methodology to solve

Bustamante, Fabián E.

364

The real problem with Merchant transmission  

SciTech Connect

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

365

Microsoft Word - CX-GrandRonde-Boyer-ImpairmentEmergency-FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Jim Semrau Civil Engineer - TEP-TPP-1 Proposed Action: Wood pole replacement PP&A Project No.: 2760 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Structures 4/5 and 4/6 of Bonneville Power Administration's (BPA) 115-kilovolt Grand Ronde-Boyer No. 1 transmission line located in Polk County, Oregon (Willamette Meridian, T6S, R8W, section 8, se ¼ of se ¼). Proposed by: BPA Description of the Proposed Action: BPA proposes to fix two ground impairments between structures 4/5 and 4/6 on the Grand Ronde-Boyer No. 1 line. The impairments are required to be fixed within 30 days of detection due to concerns for public safety. The conductor on a typical

366

CX-006815: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-006815: Categorical Exclusion Determination Cattle Creek Substation CX(s) Applied: B4.11 Date: 09/27/2011 Location(s): Bonneville County, Idaho Office(s): Bonneville Power Administration In response to Utah Associated Municipal Power System?s (UAMPS) interconnection request, Bonneville Power Administration (BPA) is planning to integrate UAMPS?s 100-megawatt (MW) Horse Butte Wind Power Generating Facility into its balancing authority. The proposed point of interconnection is at the Palisades-Goshen 115-kilovolt transmission line adjacent to tower 31/6. Document(s) Available for Download CX-006815.pdf More Documents & Publications CX-008877: Categorical Exclusion Determination CX-010590: Categorical Exclusion Determination

367

CX-004889: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-004889: Categorical Exclusion Determination Casa Grande-Empire (Geological Boring) CX(s) Applied: B3.1 Date: 08/19/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to do geologic boring within our right-of-way at structures 18/2, 21/2, 25/1, 37/5, and 41/5 along the existing Casa Grande-Empire 115 kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004889.pdf More Documents & Publications CX-007130: Categorical Exclusion Determination

368

EIS-0470: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Final Environmental Impact Statement 0: Final Environmental Impact Statement EIS-0470: Final Environmental Impact Statement Cape Wind Energy Project, Nantucket Sound, MA The DOE Loan Program Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. In December 2012, DOE adopted the Department of the Interior 2009 Final Cape Wind Energy Project EIS, in combination with the Cape Wind Environmental Assessments dated May 2010 and April 2011 (per 40 CFR

369

CX-004456: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

456: Categorical Exclusion Determination 456: Categorical Exclusion Determination CX-004456: Categorical Exclusion Determination Boysen-Copper Mountain Structure 98/1 Replacement Project, Fremont County, Wyoming CX(s) Applied: B1.3, B4.6 Date: 11/10/2010 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western proposes to replace Structure 98/1 and conduct access road maintenance on Western's existing Boysen-Copper Mountain 115 kilovolt transmission line in Fremont County, Wyoming. Structure 98/1 is located on United States (US) Bureau of Reclamation land in the southeast 1/4 of Section 16, T. 5 north, R. 6 east, of the Wind River meridian, Wyoming near the Boysen State Park Headquarters. A cleared, level area (landing) will be constructed around the base of structure 98/1 for better equipment

370

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

371

CX-007170: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

70: Categorical Exclusion Determination 70: Categorical Exclusion Determination CX-007170: Categorical Exclusion Determination Saguaro-Tucson Vegetation Removal CX(s) Applied: B1.3 Date: 03/30/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to remove vegetation under its existing Saguaro-Tucson 115-kilovolt transmission line, within Western's existing right-of-way between Structures 5/3 and 6/3 in Pinal County, Arizona. We plan on using existing access roads to the vegetation removal areas. Western will be using a front-end loader with a cutting & shredding attachment to remove the vegetation. This work is necessary to maintain the safety and reliability of the bulk electrical system. CX-007170.pdf More Documents & Publications

372

Microsoft Word - City_of_Sherwood_LURR_CX.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: City of Sherwood Sewer Line Replacement Land Use Review Request Budget Information: 184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.9 Multiple use of powerline rights-of-way Location: Sherwood, Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to approve a land use review request (LURR) submitted by the city of Sherwood (city) to replace a portion of its proposed sewer line within existing BPA fee-owned right-of-way (ROW) between structure 19/11 of BPA's Keeler-Oregon City No. 2 115-kilovolt (kV) transmission line and SW Tualatin-Sherwood Road. The city would replace

373

Categorical Exclusion Determinations: Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 5, 2012 September 5, 2012 CX-009189: Categorical Exclusion Determination (0675-1594) Eaton Corporation - Predictive Battery Management for Commercial Hybrid Vehicles CX(s) Applied: B3.6 Date: 09/05/2012 Location(s): Michigan, Minnesota, Colorado Offices(s): Advanced Research Projects Agency-Energy August 31, 2012 CX-009227: Categorical Exclusion Determination Beaver Creek- Big Sandy 115 Kilovolt Transmission Line Structure Replacements - Last Chance Fire CX(s) Applied: B4.13 Date: 08/31/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region August 29, 2012 CX-008913: Categorical Exclusion Determination High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II CX(s) Applied: A9, B3.6 Date: 08/29/2012

374

CX-007169: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

169: Categorical Exclusion Determination 169: Categorical Exclusion Determination CX-007169: Categorical Exclusion Determination Saguaro-Oracle Vegetation Removal CX(s) Applied: B1.3 Date: 04/07/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct vegetation removal between structures 0/3 and 0/4, 1/5 and 1/6, 3/1 and 3/2, 4/2 and 4/3, around structure 4/8, between structures 5/1 and 5/2 and around structure 5/4 of its Saguaro-Oracle 115- kilovolt transmission line, within Western's existing right-of-way. Western will access the vegetation removal areas using crew trucks along the existing access roads. Western will use a front end loader with a cut shredder attachment to knock down and chip wood vegetation. The debris will

375

EIS-0451: Hooper Springs Project, Caribou County, Idaho | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Hooper Springs Project, Caribou County, Idaho 1: Hooper Springs Project, Caribou County, Idaho EIS-0451: Hooper Springs Project, Caribou County, Idaho Summary This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. Public Comment Opportunities None available at this time. Documents Available for Download March 11, 2013 EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho March 8, 2013

376

Microsoft Word - CX-Rogue-GoldBeach-DisconnectSwitch-FY13_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Gregory L Vassallo Electical Engineer - TPCV-ALVEY Proposed Action: Rogue-Gold Beach No. 2 disconnect switch replacement Pollution Prevention and Abatement Project No.: 2411 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Curry County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA and Coos-Curry Electric Cooperative, Inc. (Coos- Curry) have developed a joint plan to replace the existing B-1734 115-kilovolt, group-operated disconnect switch located at BPA's Gold Beach Substation with a new horizontally-mounted,

377

EIS-0457: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0457: Final Environmental Impact Statement Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the potential environmental impacts of a Bonneville Power Administration (BPA) proposal to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line. This line extends from the Albany Substation in the City of Albany, Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. BPA issued the Draft EIS in January 2012 for public review. BPA considered all comments received to prepare this Comment-Response Addendum (download below) which, together with the Draft EIS, consitutes the Final EIS [40 CFR 1503.4(c)]. The Comment-Response Addendum includes a chapter

378

CX-007135: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7135: Categorical Exclusion Determination 7135: Categorical Exclusion Determination CX-007135: Categorical Exclusion Determination Coolidge-Oracle Crossarm Replacement CX(s) Applied: B1.3 Date: 07/29/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct Emergency Crossarm Replacement at Structures 3/3 and 38/8 along the existing Coolidge-Oracle 115-kilovolt transmission line. We will use existing access roads and rubber tired vehicles such as pickup trucks, crew trucks, and bucket trucks to bring personnel and equipment to the work area. This work is necessary to maintain the safety and reliability of the bulk electrical system. CX-007135.pdf More Documents & Publications CX-004891: Categorical Exclusion Determination

379

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91 - 22200 of 29,416 results. 91 - 22200 of 29,416 results. Page EIS-0470: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy Project on the Outer Continental Shelf off Massachusetts, Nantucket Sound The DOE Loan Programs Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. To inform DOE's decision regarding a loan guarantee, DOE adopted the Department of the Interior's 2009 Final Cape Wind Energy Project EIS,

380

Microsoft Word - CX_Memo_TVWD.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2012 31, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: Tualatin Valley Water District Waterline Land Use Review Request Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-Oregon City No.2 115-kilovolt (kV) transmission line corridor in the City of Beaverton,

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 4240 of 26,777 results. 31 - 4240 of 26,777 results. Download Congestion Analysis of the Eastern Interconnection: Simulation Results Congestion Analysis of the Eastern Interconnection: Simulation Results http://energy.gov/oe/downloads/congestion-analysis-eastern-interconnection-simulation-results Download CX-008677: Categorical Exclusion Determination Columbia and Willamette River Crossings Liquefaction Hazard Assessment CX(s) Applied: B3.1 Date: 07/23/2012 Location(s): Oregon, Oregon, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008677-categorical-exclusion-determination Download CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line CX(s) Applied: B1.3

382

EA-1467: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1467: Finding of No Significant Impact EA-1467: Finding of No Significant Impact EA-1467: Finding of No Significant Impact Bonneville-Alcoa Access Road Project Bonneville Power Administration (BPA) proposes to establish a half mile of access road to tower 9/1 along the Bonneville-Alcoa No. 1 115-kilovolt (kV) transmission line. The road is needed to replace maintenance and emergency access to tower 9/1 because the road previously used to access the tower is blocked by a landslide that occurred in 1996. Approximately 1/8 mile of the proposed road exists, although it is overgrown and needs brush clearing. The remaining 3/8 mile of road would be constructed. Bonneville-Alcoa Access Road Project More Documents & Publications EA-1366: Preliminary Environmental Assessment EA-1366: Finding of No Significant Impact

383

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 23660 of 31,917 results. 51 - 23660 of 31,917 results. Download CX-006242: Categorical Exclusion Determination North Gunnison-Salida 115-Kilovolt Transmission Line Jumper Cable Replacements, Gunnison County, Colorado CX(s) Applied: B4.6 Date: 06/14/2011 Location(s): Gunnsion, CO Office(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-006242-categorical-exclusion-determination Download CX-006244: Categorical Exclusion Determination Craig-Bears Ears-Hayden Substations Fiber Optic and Pole Installation, Moffat and Routt Counties, Colorado CX(s) Applied: B4.6, B4.7 Date: 05/17/2011 Location(s): Moffat, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-006244-categorical-exclusion-determination

384

EA-1855: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1855: Final Environmental Assessment Creston-Bell Rebuild Project, Lincoln and Spokane Counties, Washington (aka DOE/EA-4406) This EA evaluates the potential environmental impacts of a proposal to rebuild the Creston-Bell 115-kilovolt transmission line. The 54-mile long, wood pole line extends from the BPA Creston substation to the BPA Bell substation in Lincoln and Spokane Counties, Washington. The EA Revision Sheet combined with the Preliminary EA constitutes the final EA. The final EA includes a Floodplain Statement of Findings and a Mitigation Action Plan that outlines the mitigation measures that will be implemented during and after construction. Construction begins in mid May, 2012 and will be completed in the winter of 2012.

385

CX-007136: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Categorical Exclusion Determination 6: Categorical Exclusion Determination CX-007136: Categorical Exclusion Determination Coolidge-Oracle Pole Replacement CX(s) Applied: B4.6 Date: 11/13/2009 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western plans to replace deteriorated wood poles, cross arms and X-braces at 59 existing H-frame or three-pole-turning structures located along the Coolidge-Oracle 115-kilovolt Transmission Line in Pinal County, Arizona. Built in 1943, its aging components are beyond repair and require replacement. These poles performed poorly during structural tests, and we consider them unstable, This project ensures the safety of Western's workers and the public as well as reliability of the bulk electric system.

386

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 22, 2012 June 22, 2012 CX-008692: Categorical Exclusion Determination Amendment Number 2 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 06/22/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration June 21, 2012 CX-008695: Categorical Exclusion Determination Munro Control Center Expansion CX(s) Applied: B1.15 Date: 06/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 20, 2012 CX-008694: Categorical Exclusion Determination Acquisition and Disposition of Property CX(s) Applied: B1.24 Date: 06/20/2012 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration June 20, 2012 CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line

387

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 16450 of 26,764 results. 41 - 16450 of 26,764 results. Page EA-1931: Keeler-Forest Grove, Forest Grove-Tillamook Line No. 1 Line Rebuild Project, Washington and Tillamook Counties, Oregon Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available. http://energy.gov/nepa/ea-1931-keeler-forest-grove-forest-grove-tillamook-line-no-1-line-rebuild-project-washington

388

CX-006814: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6814: Categorical Exclusion Determination 6814: Categorical Exclusion Determination CX-006814: Categorical Exclusion Determination Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line Project CX(s) Applied: B4.12 Date: 10/07/2011 Location(s): Dayton, Columbia County, Washington Office(s): Bonneville Power Administration The Columbia Rural Electric Association (REA) has requested to provide power to Columbia REA?s Dayton Substation via interconnection to an existing Bonneville Power Administration (BPA) transmission line in Columbia County, Washington. Columbia REA will construct, own, operate, and maintain the proposed tap line from their Dayton Substation to the point of interconnection, but entered into an agreement with BPA to provide financial assistance to construct the approximately 7.5-mile, 115- kilovolt

389

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 12520 of 28,905 results. 11 - 12520 of 28,905 results. Download EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado http://energy.gov/nepa/downloads/eis-0159-record-decision Download STGWG Meeting- October 2009 State and Tribal Government Working Group MeetingOctober 21, 2009Hotel MonteleoneNew Orleans, Louisiana http://energy.gov/em/downloads/stgwg-meeting-october-2009 Download Letter: Direction and Guidance for Implementing Direct DOE Relationship & Funding for EMSSABs From: Assistant Secretary, Jessie Hill Roberson (EM-11) To: Mr. Monte Wilson, Chair, INEEL Citizens Advisory Board http://energy.gov/em/downloads/letter-direction-and-guidance-implementing-direct-doe-relationship Download Docket No. EERE-2008-BT-STD-0005. RIN 1904-AB57

390

EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR 57: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR Summary This EIS evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, Oregon. Public Comment Opportunities None available at this time. Documents Available for Download June 13, 2012 EIS-0457: Mitigation Action Plan Albany-Eugene Rebuild Project, Lane and Linn Counties, OR June 13, 2012 EIS-0457: Notice of Availability of a Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR June 13, 2012 EIS-0457: Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR

391

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 7870 of 26,764 results. 61 - 7870 of 26,764 results. Download CX-005726: Categorical Exclusion Determination Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy CX(s) Applied: A9, B3.1, B3.6 Date: 04/11/2011 Location(s): Bowling Green, Ohio Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-005726-categorical-exclusion-determination Download CX-006816: Categorical Exclusion Determination Line and Load Interconnection of Coos-Curry Electric Cooperative?s New Substation to Bonneville Power Administration?s Fairview-Bandon 115-Kilovolt Transmission Line CX(s) Applied: B4.6, B4.10 Date: 09/26/2011 Location(s): Coos County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-006816-categorical-exclusion-determination

392

Categorical Exclusion Determinations: B4.6 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 20, 2012 June 20, 2012 CX-008773: Categorical Exclusion Determination Airport to Boyd 115 Kilovolt Transmission Line Structure Replacements Larimer County, Colorado CX(s) Applied: B1.3, B4.6 Date: 06/20/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region June 18, 2012 CX-008769: Categorical Exclusion Determination Platform Construction for Power Pole Work CX(s) Applied: B1.13, B2.5, B4.6 Date: 06/18/2012 Location(s): Wyoming Offices(s): RMOTC June 18, 2012 CX-008769: Categorical Exclusion Determination Platform Construction for Power Pole Work CX(s) Applied: B1.13, B2.5, B4.6 Date: 06/18/2012 Location(s): Wyoming Offices(s): RMOTC June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project

393

EIS-0457: EPA Notice of Availability of a Draft Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Draft Environmental Impact Statement EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, Oregon. Comment Period Ends: 03/05/12 Submit Comments to: Douglas Corkran Environmental Specialist Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, OR 97208-3621 Toll-free telephone: 800-282-3713 Direct telephone: 503-230-7646 Fax: 503-230-5699 Electronic mail: dfcorkran@bpa.gov EIS-0457-EPANOADEIS-2012.pdf More Documents & Publications EIS-0413: EPA Notice of Availability of a Draft Environmental Impact

394

Microsoft Word - FONSI final.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville-Alcoa Access Road Project Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) proposes to establish a half mile of access road to tower 9/1 along the Bonneville-Alcoa No. 1 115-kilovolt (kV) transmission line. The road is needed to replace maintenance and emergency access to tower 9/1 because the road previously used to access the tower is blocked by a landslide that occurred in 1996. Approximately 1/8 mile of the proposed road exists, although it is overgrown and needs brush clearing. The remaining 3/8 mile of road would be constructed. BPA has prepared an Environmental Assessment (DOE/EA-1467) to determine if the Proposed Action would cause significant effects that would warrant preparing an Environmental Impact

395

Microsoft Word - CX-Franklin-BadgerCanyonGrandview-RedMtnsDisconnectSwitch_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 8, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: Franklin-Badger Canyon and Grandview-Red Mountain switch replacements PP&A Project No.: 2,349 / 2,350 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace disconnect switches and related equipment on the Franklin-Badger Canyon No.2 and Grandview-Red Mountain No.1 115- kilovolt transmission lines. The switch stands will be replaced in the same locations as the existing structures, and related load break equipment will be upgraded in-kind to existing. Both

396

EIS-0470: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: U.S. Department of Energy Loan Guarantee for the Cape 0: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy Project on the Outer Continental Shelf off Massachusetts, Nantucket Sound EIS-0470: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy Project on the Outer Continental Shelf off Massachusetts, Nantucket Sound Summary The DOE Loan Programs Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. To inform DOE's decision regarding a loan guarantee, DOE adopted

397

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15, 2011 15, 2011 CX-006137: Categorical Exclusion Determination B39 Cellular Repeater Installation CX(s) Applied: B1.7 Date: 06/15/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory June 15, 2011 CX-006136: Categorical Exclusion Determination Field Testing of Low Impact Oil Field Roads CX(s) Applied: B3.7 Date: 06/15/2011 Location(s): Webb County, Texas Office(s): Fossil Energy, National Energy Technology Laboratory June 15, 2011 CX-006079: Categorical Exclusion Determination Topic 7A, Emergency Backup Power Systems CX(s) Applied: A9, B5.1 Date: 06/15/2011 Location(s): Georgia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office June 14, 2011 CX-006242: Categorical Exclusion Determination North Gunnison-Salida 115-Kilovolt Transmission Line Jumper Cable

398

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 18060 of 28,905 results. 51 - 18060 of 28,905 results. Download CX-007819: Categorical Exclusion Determination Yellowtail Dam Tie Lines CX(s) Applied: B2.5, B4.6 Date: 01/25/2012 Location(s): Montana Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-007819-categorical-exclusion-determination Download CX-008377: Categorical Exclusion Determination Alcova-Casper North 115 Kilovolt Transmission Line Pole Replacements CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008377-categorical-exclusion-determination Download CX-008383: Categorical Exclusion Determination Cheyenne Substation West Control Building Roof Replacement CX(s) Applied: B1.3

399

CX-007158: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

58: Categorical Exclusion Determination 58: Categorical Exclusion Determination CX-007158: Categorical Exclusion Determination Oracle-Tucson Pole Replacement CX(s) Applied: B4.6 Date: 04/16/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western plans to replace deteriorated wood poles, cross arms and X-braces at two existing H-frame structures located along the Oracle Tucson 115-kilovolt Transmission Line in Pima, Arizona. Built in 1943, its aging components are beyond repair and require replacement. These poles performed poorly during structural tests, and we consider them unstable. This replacement project will ensure the safety of Western's workers and the public as well as reliability of the bulk electric system. CX-007158.pdf More Documents & Publications

400

Categorical Exclusion Determinations: Arizona | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 8, 2010 July 8, 2010 CX-003196: Categorical Exclusion Determination Emergency Crossarm Replacement at Structure 39/7 and Access Road Maintenance along the Existing Tucson-Apache 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B1.3 Date: 07/08/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region July 6, 2010 CX-003004: Categorical Exclusion Determination Arizona-Tribal Energy Program-Hualapai Tribe CX(s) Applied: A9, B3.1 Date: 07/06/2010 Location(s): Hualapai Tribe, Arizona Office(s): Energy Efficiency and Renewable Energy July 2, 2010 CX-002842: Categorical Exclusion Determination Overcoming Critical Barriers to United States Wind Power; A University-Industry Consortium CX(s) Applied: A9 Date: 07/02/2010

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

CX-005130: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-005130: Categorical Exclusion Determination Ringold Substation Structure Replacement Project CX(s) Applied: B4.6 Date: 01/21/2011 Location(s): Basin City, Washington Office(s): Bonneville Power Administration Bonneville Power Administration is proposing to replace the single pole structure 8/9 of the Benton-Scooteney No. 1 115-kilovolt (kV) transmission line, the attached vertically mounted disconnect switch, and current guy wiring with a new, 30-foot wide, three-pole transposition structure, a new horizontally mounted disconnect switch, and new guy wiring. In addition, a new 14-foot wide two-pole structure and a new 25?5-foot switch support structure would be installed roughly 30-feet ahead of the substation dead-end and approximately 15-feet ahead of the KD, respectively. There

402

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 CX-008430: Categorical Exclusion Determination Texas-City-Grapevine CX(s) Applied: A9, B1.32, B2.5, B3.6, B5.1, B5.16, B5.17 Date: 07/03/2012 Location(s): Texas Offices(s): Energy Efficiency and Renewable Energy July 2, 2012 CX-009440: Categorical Exclusion Determination State Energy Plan Council School District Woody Biomass Project CX(s) Applied: B5.1, B5.5 Date: 07/02/2012 Location(s): Idaho Offices(s): Golden Field Office July 2, 2012 CX-008782: Categorical Exclusion Determination Danger Tree Management on North Gunnison to Skito 115 Kilovolt Transmission Line Gunnison County, Colorado CX(s) Applied: B1.3 Date: 07/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region July 2, 2012 CX-008781: Categorical Exclusion Determination

403

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 15590 of 28,905 results. 81 - 15590 of 28,905 results. Download CX-003195: Categorical Exclusion Determination Oracle-Tucson 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B4.13 Date: 06/10/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region http://energy.gov/nepa/downloads/cx-003195-categorical-exclusion-determination Download CX-003358: Categorical Exclusion Determination American Recovery and Reinvestment Act State Energy Program State of Texas Southmost College - Photovoltaic - Wind Hybrid System CX(s) Applied: B5.1 Date: 08/11/2010 Location(s): Brownsville, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-003358-categorical-exclusion-determination

404

EA-1636: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan EA-1636: Mitigation Action Plan Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kVtransmission line in Linn, Benton and Lincoln counties, Oregon. Mitigation Action Plan for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project More Documents & Publications EA-1636: Final Environmental Assessment EA-1636: Finding of No Significant Impact

405

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91 - 13400 of 31,917 results. 91 - 13400 of 31,917 results. Download CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 06/20/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008693-categorical-exclusion-determination Download CX-008694: Categorical Exclusion Determination Acquisition and Disposition of Property CX(s) Applied: B1.24 Date: 06/20/2012 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008694-categorical-exclusion-determination Download Independent Activity Report, Savannah River Remediation- July 2010 Savannah River Operations Office Integrated Safety Management System Phase

406

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 30240 of 31,917 results. 31 - 30240 of 31,917 results. Download CX-008709: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008709-categorical-exclusion-determination Download CX-008713: Categorical Exclusion Determination 2012 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008713-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV),

407

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 17230 of 28,905 results. 21 - 17230 of 28,905 results. Page EIS-0470: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy Project on the Outer Continental Shelf off Massachusetts, Nantucket Sound The DOE Loan Programs Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. To inform DOE's decision regarding a loan guarantee, DOE adopted the Department of the Interior's 2009 Final Cape Wind Energy Project EIS,

408

CX-004263: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-004263: Categorical Exclusion Determination L0295 - Saint Johns-Saint Helens Number 1 Interconnection Project CX(s) Applied: B4.6 Date: 10/15/2010 Location(s): Columbia County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install a new tap and associated disconnect structures on BPA?s Saint Johns-Saint Helens Number 1 115-kilovolt (kV) transmission line to provide a point of interconnection for Columbia River Public Utility District's (CRPUD's) new Columbia River Substation. CRPUD is constructing the new 115-kV substation in Columbia County, Oregon to serve residential load growth in the area. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004263.pdf More Documents & Publications

409

EA-1855: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission line. The 54-mile long, wood pole line extends from the BPA Creston substation to the BPA Bell substation in Lincoln and Spokane Counties, Washington. The project would include replacing wood poles, associated structural components, and conductor, improvements to some existing access roads, construction of 10 miles of new access roads, and some vegetation removal. The rebuild would enable BPA to maintain reliable electric service and avoid risks to the public and worker safety. The line would continue to operate at 115-kV. EA-1855-DEA-2012-BPA-Creston-Bell.pdf More Documents & Publications

410

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 27540 of 28,904 results. 31 - 27540 of 28,904 results. Download CX-009088: Categorical Exclusion Determination Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3 Date: 08/07/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-009088-categorical-exclusion-determination Download CX-009093: Categorical Exclusion Determination Knolls Laboratory Q14 Sprinkler System Upgrade Project CX(s) Applied: B1.15, B2.2 Date: 08/03/2012 Location(s): New York Offices(s): Naval Nuclear Propulsion Program http://energy.gov/nepa/downloads/cx-009093-categorical-exclusion-determination Download CX-009101: Categorical Exclusion Determination Monosodium Titanate (MST) Rheology

411

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 12, 2012 June 12, 2012 CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008697: Categorical Exclusion Determination Sale of Line Mile 1 of the 115 Kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line CX(s) Applied: B1.24 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration June 5, 2012 CX-008702: Categorical Exclusion Determination Forest Grove-McMinnville #1 Wood Pole Replacement Projects

412

Microsoft Word - CX-Drummond-MacksInn-WoodPoleReplacementFY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2012 29, 2012 REPLY TO ATTN OF: KEP-CELILO SUBJECT: Environmental Clearance Memorandum Mark Hadley Lineman Foreman III - TFIF-Idaho Falls Proposed Action: Wood pole replacements along the Drummond-Macks Inn, Macks Inn- Madison, and Swan Valley-Teton 115-kilovolt (kV) transmission line rights-of-way. PP&A Project Number: 2486 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The project area is located in Bonneville Power Administration's (BPA) Idaho Falls District. Project locations are listed below: Project Location Township Range Section(s) County Line Name Structures Use Ownership 3N 44E 28 Teton Swan Valley - Teton 10/6 Forest Forest Service 14S 5E 19 Fremont

413

Categorical Exclusion Determinations: Nebraska | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nebraska Nebraska Categorical Exclusion Determinations: Nebraska Location Categorical Exclusion Determinations issued for actions in Nebraska. DOCUMENTS AVAILABLE FOR DOWNLOAD August 20, 2013 CX-010891: Categorical Exclusion Determination Archer-Stegall 230-Kilovolt Fiber Optic Ground Wire Addition CX(s) Applied: B4.7 Date: 08/20/2013 Location(s): Nebraska, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region August 8, 2013 CX-010887: Categorical Exclusion Determination Archer-Sidney 115-Kilovolt Transmission Line Structure Replacement CX(s) Applied: B4.13 Date: 08/08/2013 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region June 4, 2013 CX-010549: Categorical Exclusion Determination Chappell, Julesburg, and Kersey Tap Line Switch Replacements in Deuel

414

CX-007130: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30: Categorical Exclusion Determination 30: Categorical Exclusion Determination CX-007130: Categorical Exclusion Determination Casa Grande-Empire CX(s) Applied: B3.1 Date: 09/14/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to do geologic borings within our right-of-way near structures 18/5, 19/6, 21/2, 2317, 26/4, 28/4, 36/1, 37/5, 39/4 and 41/4 along the existing Casa Grande-electrical district #5 115-kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring personnel and equipment to the work areas.

415

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 2950 of 28,905 results. 41 - 2950 of 28,905 results. Download CX-006303: Categorical Exclusion Determination Interconnection of the Pronghorn Gas Plant 115 Kilovolt Transmission Line CX(s) Applied: B4.11 Date: 07/14/2011 Location(s): Montana Office(s): Western Area Power Administration-Upper Great Plains Region http://energy.gov/nepa/downloads/cx-006303-categorical-exclusion-determination Download CX-006110: Categorical Exclusion Determination Virginia-City-Alexandria CX(s) Applied: A1, A9, A11, B5.1 Date: 06/21/2011 Location(s): Alexandria, Virginia Office(s): Energy Efficiency and Renewable Energy http://energy.gov/nepa/downloads/cx-006110-categorical-exclusion-determination Download CX-006031: Categorical Exclusion Determination Oregon-Tribe-Confederated Tribes of the Grand Ronde Community of Oregon

416

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 20, 2013 June 20, 2013 CX-010551: Categorical Exclusion Determination Alcova-Miracle Mile East 115 Kilovolt Transmission Line Structure Replace and Road Maintenance, Carbon and Natrona Counties, Wyoming CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region June 20, 2013 CX-010655: Categorical Exclusion Determination Roof Repair on Crane Maintenance Area Roof CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010656: Categorical Exclusion Determination Stormwater Drainage Repair CX(s) Applied: B1.3 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 17, 2013 CX-010662: Categorical Exclusion Determination

417

CX-006302: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

302: Categorical Exclusion Determination 302: Categorical Exclusion Determination CX-006302: Categorical Exclusion Determination Colville-Republic Rebuild Project CX(s) Applied: B1.3, B4.6 Date: 07/21/2011 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures along approximately 13.5 miles of the Colville-Republic No. 1 115 kilovolt (kV) transmission line (structures 1/1-14/5). BPA would replace wood pole structures in kind and at their currently existing locations. In addition to pole replacement, BPA would replace structure crossarms, insulators, dampers and conductor. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006302.pdf More Documents & Publications CX-010439: Categorical Exclusion Determination

418

CX-008378: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8378: Categorical Exclusion Determination 8378: Categorical Exclusion Determination CX-008378: Categorical Exclusion Determination Archer 230 Kilovolt Bay Addition for New Point of Delivery - Stage 07 CX(s) Applied: B4.6 Date: 03/08/2012 Location(s): CX: none Offices(s): Western Area Power Administration-Rocky Mountain Region Tri-State Generation and Transmission Association, Inc. (Tri-State), has requested an interconnection to Western Area Power Administration's (Western) Archer 230/115-Kilovolt (kV) Substation (Archer Substation). The Archer Substation is a Designated Point of Delivery from Western to Tri-State as set forth in Exhibit A of Contract No. 87-LAO-172 (TS-89-0005), Finn Electric Service (Contract). CX-008378.pdf More Documents & Publications CX-010891: Categorical Exclusion Determination

419

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51: Draft Environmental Impact Statement 51: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

420

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2013 0, 2013 CX-010418: Categorical Exclusion Determination Eastern Colorado Field Office Com Buildings Removal CX(s) Applied: B1.22, B1.23, B1.24 Date: 05/20/2013 Location(s): Colorado, Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region May 20, 2013 CX-010523: Categorical Exclusion Determination Fracture Evolution Following Hydraulic Stimulations within EGS Reservoirs CX(s) Applied: A9, B3.1, B3.6 Date: 05/20/2013 Location(s): Utah Offices(s): Golden Field Office May 20, 2013 CX-010407: Categorical Exclusion Determination Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line Access Road Maintenance between Structure 26/8 and 26/9 CX(s) Applied: B1.3 Date: 05/20/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 - 1710 of 26,777 results. 01 - 1710 of 26,777 results. Download CX-000603: Categorical Exclusion Determination Baseload Energy Inc. Brasada-Harney 115-kilovolt Transmission Line Project CX(s) Applied: B4.6 Date: 02/04/2010 Location(s): Deschutes County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-000603-categorical-exclusion-determination Article Energy Department Investments to Develop Lighter, Stronger Materials for Greater Vehicle Fuel Economy Seven Projects Will Speed Commercialization of Lightweighting and Propulsion Technologies http://energy.gov/articles/energy-department-investments-develop-lighter-stronger-materials-greater-vehicle-fuel Download FIA-13-0036- In the Matter of Sierra Club On June 25, 2013, the Office of Hearings and Appeals (OHA) issued a

422

EIS-0470: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy Project on the Outer Continental Shelf off Massachusetts, Nantucket Sound  

Energy.gov (U.S. Department of Energy (DOE))

The DOE Loan Programs Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. To inform DOE's decision regarding a loan guarantee, DOE adopted the Department of the Interior’s 2009 Final Cape Wind Energy Project EIS, in combination with two Cape Wind Environmental Assessments dated May 2010 and April 2011 (per 40 CFR 1506.4), as a DOE Final EIS (DOE/EIS-0470). The adequacy of the Department of the Interior final EIS adopted by DOE is the subject of a judicial action.

423

Categorical Exclusion Determinations: Arizona | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 23, 2009 November 23, 2009 CX-000202: Categorical Exclusion Determination Energy Efficiency and Renewable Energy in Schools CX(s) Applied: B5.1 Date: 11/23/2009 Location(s): Arizona Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 13, 2009 CX-007136: Categorical Exclusion Determination Coolidge-Oracle Pole Replacement CX(s) Applied: B4.6 Date: 11/13/2009 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region November 13, 2009 CX-001118: Categorical Exclusion Determination Emergency Wood Pole Replacement at 59 Structures Located Along the Coolidge-Oracle 115-Kilovolt Transmission Line CX(s) Applied: B4.6 Date: 11/13/2009 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

424

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 15090 of 28,560 results. 81 - 15090 of 28,560 results. Download CX-000603: Categorical Exclusion Determination Baseload Energy Inc. Brasada-Harney 115-kilovolt Transmission Line Project CX(s) Applied: B4.6 Date: 02/04/2010 Location(s): Deschutes County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-000603-categorical-exclusion-determination Download CX-002368: Categorical Exclusion Determination Puget Sound Tidal Energy Demonstration Project: Environmental and Permitting Activities CX(s) Applied: B3.1, B3.3, A9 Date: 05/10/2010 Location(s): Puget Sound, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-002368-categorical-exclusion-determination Download CX-003333: Categorical Exclusion Determination

425

Categorical Exclusion Determinations: B4.13 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Categorical Exclusion Determinations: B4.13 Existing Regulations B4.13: Upgrading and rebuilding existing powerlines Upgrading or rebuilding approximately 20 miles in length or less of existing electric powerlines, which may involve minor relocations of small segments of the powerlines. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD August 8, 2013 CX-010887: Categorical Exclusion Determination Archer-Sidney 115-Kilovolt Transmission Line Structure Replacement CX(s) Applied: B4.13 Date: 08/08/2013 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

426

Microsoft Word - CX-Keeler-OregonCity_Access_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Shelley Fenton Shelley Fenton Realty Specialist - TERR-3 Proposed Action: Bonneville Power Administration (BPA) proposes to grant the Murray Hill Recreation Association permission to cross the BPA right-of-way on the Keeler-Oregon City No. 2, 115-kilovolt (kV) corridor between Tower 14/4 and Tower 14/6+250. PP&A Project No.: PP&A 2023 Budget Information: N/A Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Grant or denial of requests for multiple use of a transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and drainage culverts. Location: Section 32; Township 1 South; Range 1 West; Willamette Meridian; Washington County, Oregon Proposed by: BPA

427

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 16, 2009 December 16, 2009 CX-000556: Categorical Exclusion Determination Willoby Substation Construction Project-Weld County, Colorado CX(s) Applied: B4.11 Date: 12/16/2009 Location(s): Weld County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region December 2, 2009 CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region November 16, 2009 CX-000554: Categorical Exclusion Determination Ogallala Substation KY1A Transformer Replacement CX(s) Applied: B4.6 Date: 11/16/2009 Location(s): Ogallala, Nebraska Office(s): Western Area Power Administration-Rocky Mountain Region

428

EIS-0457: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57: Final Environmental Impact Statement 57: Final Environmental Impact Statement EIS-0457: Final Environmental Impact Statement Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the potential environmental impacts of a Bonneville Power Administration (BPA) proposal to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line. This line extends from the Albany Substation in the City of Albany, Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. BPA issued the Draft EIS in January 2012 for public review. BPA considered all comments received to prepare this Comment-Response Addendum (download below) which, together with the Draft EIS, consitutes the Final EIS [40 CFR 1503.4(c)]. The Comment-Response Addendum includes a chapter

429

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 24260 of 31,917 results. 51 - 24260 of 31,917 results. Download CX-003196: Categorical Exclusion Determination Emergency Crossarm Replacement at Structure 39/7 and Access Road Maintenance along the Existing Tucson-Apache 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B1.3 Date: 07/08/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region http://energy.gov/nepa/downloads/cx-003196-categorical-exclusion-determination Download CX-003136: Categorical Exclusion Determination Collect Soil Samples Near the Chariot, Alaska Site CX(s) Applied: B3.1 Date: 07/07/2010 Location(s): Cape Thompson, Alaska Office(s): Legacy Management http://energy.gov/nepa/downloads/cx-003136-categorical-exclusion-determination Download CX-003621: Categorical Exclusion Determination

430

Electronics and hydraulics control transmission  

SciTech Connect

Caterpillar engineers have combined electronics and hydraulics for improved transmission control and productivity. The control system had extensive field test experience during development. The system accumulated more than 100,000 hours on 17 vehicles, with individual vehicle times in the 2000-10,000-hour range. Job sites were chosen to test the system over a wide range of applications and locales. The EPTC components are CAT-designed and made by outside suppliers. The components must comply with CAT designs and specifications. All components are 100% functionally tested. The control box is computer-tested functionally at the supplier and at CAT before vehicle installation.

Morris, H.C.; Sorrells, G.K.

1986-04-01T23:59:59.000Z

431

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

432

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

433

Application of EPRI's Transmission Services Costing Framework to the Development of Open Access Transmission Tariffs  

Science Conference Proceedings (OSTI)

Public utilities in the United States are expected to provide transmission services and ancillary services to eligible customers. This report documents how Centerior Energy Corporation developed a network integration transmission service tariff, a point-to-point transmission service tariff, and four ancillary services tariffs by applying EPRI's Transmission Services Costing Framework.

1996-03-09T23:59:59.000Z

434

The role of transmission investment in the coordination between generation and transmission  

E-Print Network (OSTI)

generation and transmission of electricity into distinct modules. The governance structure of transmission the governance of electricity transmission assets influences the implementation of power flow management. Finally to coordinate generation and transmission of electricity is in real organizations. 1 Assistant Professors

Paris-Sud XI, Université de

435

Colorado/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Roadmap < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

436

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

437

California/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Roadmap < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

438

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

439

Transmission Electron Microscopy Study of InN Nanorods  

E-Print Network (OSTI)

Transmission Electron Microscopy Study of InN Nanorods Z.epitaxy and studied by transmission electron microscopy,establish their quality. Transmission electron microscopy (

Liliental-Weber, Z.; Li, X.; Kryliouk, Olga; Park, H.J.; Mangum, J.; Anderson, T.

2008-01-01T23:59:59.000Z

440

National Transmission Grid Study: 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Grid Study: 2002 National Transmission Grid Study: 2002 National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE)...

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

California/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

CaliforniaTransmissionLocal Regulations < California | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State...

442

Transmission Forum Agenda - February 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transmission Forum Agenda - February 2012 Transmission Forum Agenda - February 2012 FINAL AGENDA - Transmission Forum Feb 2012 (Denver) 020212.pdf More Documents & Publications DOE...

443

PP-76 The Vermont Electric Transmission Company | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 The Vermont Electric Transmission Company PP-76 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to construct,...

444

PP-76-1 The Vermont Electric Transmission Company | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76-1 The Vermont Electric Transmission Company PP-76-1 The Vermont Electric Transmission Company Presidential Permit authorizing The Vermont Electric Transmission Company to...

445

EMISSION AND TRANSMISSION NOISE PROPAGATION IN POSITRON EMISSION COMPUTED TOMOGRAPHY  

E-Print Network (OSTI)

26-29, 1979 EMISSION AND TRANSMISSION NOISE PROPAGATION INLBL-9783 EMISSION AND TRANSMISSION NOISE PROPAGATION INl·. LBL-9783 EMISSION AND TRANSMISSION NOISE PROPAGATION IN

Gullberg, G.T.

2010-01-01T23:59:59.000Z

446

Comments of New England Electric Transmission Corporation on...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

447

Automated manual transmission mode selection controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI)

1999-11-09T23:59:59.000Z

448

Automated manual transmission shift sequence controller  

DOE Patents (OSTI)

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both, an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Richard G. (Royal Oak, MI); Rausen, David J. (Denver, CO)

2000-02-01T23:59:59.000Z

449

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Roadmap Idaho/Transmission/Roadmap < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

450

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

451

Colorado/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Summary Colorado/Transmission/Summary < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution. State Siting Act None State Preemptive Authority The CPUC has backstop authority only. If a permit is denied by the local government, the applicant may appeal to the CPUC if certain conditions are met (CRS 29-20-108).

452

Open Access Transmission and Renewable Energy Technologies  

Science Conference Proceedings (OSTI)

In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

Porter, K.

1996-09-01T23:59:59.000Z

453

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

454

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

455

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

1987-05-19T23:59:59.000Z

456

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

457

Ferris State University | Open Energy Information  

Open Energy Info (EERE)

Information About Partnership with NREL Partnership with NREL Yes Partnership Type Test & Evaluation Partner Partnering Center within NREL Electricity Resources & Building...

458

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation...

459

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home Savings Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission...

460

Kangley - Echo Lake Transmission Line Project, Final Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selleck Kangley North Bend Cedar Falls Existing Transmission Lines Proposed Transmission Line Alternatives Under Consideration BPA Substation Alternative * * * * * * ...

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

462

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library < Transmission Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database About Transmission Electricity Transmission: A Primer Overview of the grid system and the role of states in overseeing this system. The Design, Construction, and Operation of Long-Distance High-Voltage

463

Regional Transmission Planning Webinar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

464

California/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Summary < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In California, the California Public Utilities Commission (CPUC) has authority to site transmission lines of 200kV or higher. The CPUC is authorized to approve or deny the applicant's request for the Certificate

465

Magnetic Materials for Broadband Transmission Line  

E-Print Network (OSTI)

The author’s series of articles on broadband transmission line transformers (TLTs) concludes with these notes on magnetic materials and the properties that are important for best performance Ferrite and iron powder magnetic materials were developed to support a wide range of components, including inductors, EMI suppressors, conventional transformers and transmission line transformers (TLTs). This article deals with transmission line transformers, presenting the observations and conclusions of the author, reached after extensive experimental research into the behavior and performance of these devices in broadband applications. Figure 1 · The three transformers used in comparing the performance of the autotransformer and the transmission line transformer. At the top left is an autotransformer; at the top right is the transmission line transformer, while at the bottom is a transmission line transformer without a ferrite core. All transformers had a total of 10 turns.

Jerry Sevick

2005-01-01T23:59:59.000Z

466

Transmission Electron Microscope and Scanning Electron Microscopes -  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities > Transmission Electron Facilities > Transmission Electron Microscope and Scanning Electron Microscopes FACILITIES Transmission Electron Microscope and Scanning Electron Microscopes Overview Other Facilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Transmission Electron Microscope and Scanning Electron Microscopes The research activities of the Corrosion and Mechanics of Materials Section are supported by complete metallography/sample preparation rooms equipped with several optical and electron microscopes: a Transmission Electron Microscope and two Scanning Electron Microscopes. Bookmark and Share Transmission electron microscope (TEM) Detail of JEOL 100CXII TEM Figure 1: Detail of JEOL 100CXII TEM. Click on image to view larger image.

467

Overhead Transmission Inspection and Assessment Guidelines -- 2011  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line compon...

2011-12-23T23:59:59.000Z

468

Overhead Transmission Inspection and Assessment Guidelines - 2012  

Science Conference Proceedings (OSTI)

The emphasis within the transmission arena has shifted from designing and building new transmission facilities to optimizing the use, performance, and life of existing facilities. In the early 1990s, EPRI established an initiative to examine the capabilities and limitations of existing inspection and assessment methods and technology. One of the key needs identified was information on methods and technologies for inspecting/assessing the conditions and life expectancy of overhead transmission line ...

2012-12-20T23:59:59.000Z

469

Transmission Cable Life Evaluation and Management  

Science Conference Proceedings (OSTI)

High-pressure fluid-filled (HPFF) transmission cable systems constitute nearly 80 percent of the transmission cables in the United States, and represent an estimated $18 billion investment, in present-day dollars. Many of these systems are reaching or have exceeded their design life of 40 years, and evaluating their condition and remaining life is of utmost importance to utilities seeking to make full use of their underground transmission assets. This report describes procedures and diagnostic tools for ...

1998-12-24T23:59:59.000Z

470

Transmission System: Loss Reduction and Utilization Enhancement  

Science Conference Proceedings (OSTI)

EPRI R&D program 172Efficient Transmission Systems for a Carbon-Constrained Worldcomprises base research activities and a series of demonstration projects under the collaborative efforts led by EPRI, the Federal Energy Regulatory Commission (FERC), and the transmission industry. The program's goal is to understand, through real-life examples, designs that can help build a more efficient transmission system. Base research and development activities under program P172 have set the foundation for the demons...

2011-12-13T23:59:59.000Z

471

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

High-voltage direct current (HVDC) transmission lines are used to transmit large amounts of power over long distances. The Electric Power Research Institute (EPRI) and others have produced many publications over approximately the past three decades, expounding on this topic. Several HVDC transmission lines have been built and have been in operation around the world over that period, and recently, there has been increased interest in the advantages that HVDC transmission affords. HVDC lines, like high-vol...

2010-12-23T23:59:59.000Z

472

EPRI Increased Transmission Capacity Workshop Proceedings  

Science Conference Proceedings (OSTI)

This report documents the proceedings of EPRI's Increased Overhead Transmission Capacity Workshop. The workshop was held on September 20, 2011 at the offices of the American Transmission Company in Waukesha, Wisconsin. Participants included members of the EPRI Increased Overhead Transmission Capacity Task Force. The workshop was a joint effort of two EPRI research projects: (1) Increased Power Flow Guidebook and Ratings for Overhead Lines, and (2) Impact of High Temperature Operation on Conductor Systems...

2011-11-30T23:59:59.000Z

473

FERC rate incentives for transmission infrastructure development  

Science Conference Proceedings (OSTI)

With enactment of the Energy Policy Act of 2005, Congress delivered a mandate to the Federal Energy Regulatory Commission to establish regulations that would provide for incentive-based rate treatments for investments that would improvement the nation's electric transmission system. That has required FERC to move from merely approving cost-based rates for transmission services to enacting new regulations that would make it more attractive to invest in transmission infrastructure without offending the ''just and reasonable'' rate standard. (author)

Snarr, Steven W.

2010-03-15T23:59:59.000Z

474

RRTT - Rapid Response Team for Transmission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

475

Transmission Congestion Study COMMENTS OF CONSOLIDATED EDISION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preparation of the 2012 National Electric Transmission Congestion Study COMMENTS OF CONSOLIDATED EDISION COMPANY OF NEW YORK. INC. AND ORANGE AND ROCKLAND UTILITIES, INC....

476

2009 National Electric Transmission Congestion Study - Hartford...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hartford Workshop 2009 National Electric Transmission Congestion Study - Hartford Workshop On July 9, 2008, DOE hosted a regional pre-study workshop in Hartford, CT to receive...

477

2012 National Electric Transmission Congestion Study - Philadelphia...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Workshop 2012 National Electric Transmission Congestion Study - Philadelphia Workshop On December 6, 2011, DOE hosted a regional pre-study workshop in Philadelphia, PA...

478

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2...

479

Lone Star Transmission LLC | Open Energy Information  

Open Energy Info (EERE)

LLC Place Juno Beach, Florida Zip 33408 Product Wholly owned subsidiary of FPL Energy, developing transmission lines. First project is the DFW Express high voltage DC...

480

Transmission Expansion Planning Using an AC Model  

E-Print Network (OSTI)

Jan 2, 2013 ... Abstract: Transmission expansion planning (TEP) is a rather complicated process which requires extensive studies to determine when, where ...

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

NREL: Transmission Grid Integration - Issues Affecting Renewable...  

NLE Websites -- All DOE Office Websites (Extended Search)

issues related to the integration of renewable energy sources into the transmission system. Developing solutions to these challenges will enable higher penetrations of...

482

Midwest Independent Transmission System Operator | Open Energy...  

Open Energy Info (EERE)

Name Midwest Independent Transmission System Operator Place Carmel, IN References SGIC1 No information has been entered for this organization. Add Organization This article is a...

483

Transmission eigenvalues for operators with constant coefficients  

E-Print Network (OSTI)

In this paper we study the interior transmission problem and transmission eigenvalues for multiplicative perturbations of linear partial differential operator of order $\\ge 2$ with constant real coefficients. Under suitable growth conditions on the symbol of the operator and the perturbation, we show the discreteness of the set of transmission eigenvalues and derive sufficient conditions on the existence of transmission eigenvalues. We apply these techniques to the case of the biharmonic operator and the Dirac system. In the hypoelliptic case we present a connection to scattering theory.

Michael Hitrik; Katsiaryna Krupchyk; Petri Ola; Lassi Päivärinta

2010-04-28T23:59:59.000Z

484

NREL: Transmission Grid Integration - Working With Us  

NLE Websites -- All DOE Office Websites (Extended Search)

Working With Us NREL works with industry, government, and academia on transmission integration research. Learn how you can work with us. Develop Technology Partnerships There are a...

485

American Transmission Company LLC | Open Energy Information  

Open Energy Info (EERE)

American Transmission Company LLC Place Waukesha, WI References SGIC1 No information has been entered for this organization. Add Organization This article is a stub. You can help...

486

NREL: Transmission Grid Integration - Solar Integration National...  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Western Wind and Solar Integration Study and Eastern Wind Integration and Transmission Study datasets greatly advanced the modeling of wind and solar power production...

487

Available Technologies: Transmission Electron Microscope Phase ...  

Robert Glaeser and Jian Jin have developed an apparatus that can be integrated into transmission electron microscopes (TEMs) to enable high contrast imaging of weak ...

488

OFDM techniques for multimedia data transmission.  

E-Print Network (OSTI)

??Orthogonal Frequency Division Multiplexing (OFDM) is an efficient parallel data transmission scheme that has relatively recently become popular in both wired and wireless communication systems… (more)

Neville, K

2011-01-01T23:59:59.000Z

489

Transmission planning in deregulated power markets.  

E-Print Network (OSTI)

??Transmission systems in deregulated power systems have largely been left to centralized network operators although various forms of participation by merchant operators have been proposed.… (more)

Panambarage Anton Jagath Fonseka.

2008-01-01T23:59:59.000Z

490

The hidden value of transmission assets  

SciTech Connect

Numerous utilities have realized that they can do better with their transmission assets than neutering them into ISOs and have proposed the creation of for-profit transmission companies (Transcos). This would turn transmission assets into equity with higher risk but also returns potentially higher than the regulated cost of capital. This article's contribution to the ongoing debate is to show that Transcos constitute a simple and robust solution to transmission congestion problems that would otherwise jeopardize the advent of competitive power markets. Policymakers and regulators should therefore view favorably the emergence of for-profit, regulated transmission companies, and leave them with reasonable room to recover their cost and earn a fully compensatory return on investment. Regulatory benevolence is crucial for Transcos, for electric power transmission is arguably the ultimate regulated activity: significant economies of scale and wide-ranging network externalities (the infamous loop flows) make operation and management of the grid a natural monopoly that must be regulated. A significant share of the value at stake therefore hinges on the regulator's attitude towards the for-profit transmission company: if the regulator is favorable, she will leave enough room to recover the variable and capital costs. If she is unfavorable, the proposition is simply a non-starter. This article first builds a public policy argument in favor of transmission companies, then discusses the key success factors required to create significant value in transmission: regulatory prowess and superior network management.

Nasser, T.O. (McKinsey and Co., Washington, DC (United States))

1999-06-01T23:59:59.000Z

491

Iran Thomas Auditorium, 8600 Environmental Transmission Electron...  

NLE Websites -- All DOE Office Websites (Extended Search)

April 26, 2012 11:00 am Iran Thomas Auditorium, 8600 Environmental Transmission Electron Microscopy for Catalysis Research: The Example of Carbon Nanotubes Eric A. Stach Center for...

492

Northern Pass Transmission Line Project Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September...

493

Atom Probe Tomography and Transmission Electron Microscopy ...  

Science Conference Proceedings (OSTI)

Abstract Scope, Atom probe tomography (APT) and analytical transmission .... of a Leaking Type 316 Socket Weld in a Boron Injection Tank Sampling Line.

494

TransWest Express Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

a whollyowned subsidiary of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing...

495

ESSAYS IN FINANCIAL TRANSMISSION RIGHTS PRICING.  

E-Print Network (OSTI)

??This work examines issues in the pricing of financial transmission rights in the PJM market region. The US federal government is advocating the creation of… (more)

Posner, Barry

2006-01-01T23:59:59.000Z

496

TUTORIALS: Introduction to Conventional Transmission Electron ...  

Science Conference Proceedings (OSTI)

Jul 2, 2008 ... The link provided accesses the web site for the text, Introduction to Conventional Transmission Electron Microscopy by Marc DeGraef. The site ...

497

Frontiers of In Situ Transmission Electron Microscopy  

Science Conference Proceedings (OSTI)

... significance and versatility of in situ transmission electron microscopy (TEM) has ... applied stimulus is observed as it happens inside the microscope. ...

2013-05-29T23:59:59.000Z

498

2009 National Electric Transmission Congestion Study - Oklahoma...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- Oklahoma City Workshop 2009 National Electric Transmission Congestion Study - Oklahoma City Workshop On June 18, 2008, DOE hosted a regional pre-study workshop in Oklahoma City,...

499

Directional Reactive Power Ground Plane Transmission - Energy ...  

ORNL researchers have developed a pioneering power ... out-of-phase with respect to time. This phenomenon allows electrical transmission on a single ...

500

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z