Powered by Deep Web Technologies
Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

S-1 S-1 Summary This summary covers the major points of the draft environmental impact statement (DEIS) prepared for the Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project (Libby-Troy Project). This DEIS was prepared by Bonneville Power Administration (BPA). The project would include rebuilding a 17-mile section of an existing BPA transmission line located between Libby and Troy, Montana. S.1 Purpose of and Need for Action Historically, BPA has served electrical loads in northwestern Montana and northern Idaho with transmission facilities from Libby Dam east of Libby, Montana through Bonners Ferry Substation west of Bonners Ferry, Idaho to Albeni Falls Dam near the Idaho-Washington border (Figure S-1). These

2

Notice of Intent for the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line (DOE/EIS-0379) (05/05/05)  

Broader source: Energy.gov (indexed) [DOE]

56 56 Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices Angeles to change between direct current and alternating current. This proposed converter station would be located in the vicinity of BPA's Port Angeles Substation in Clallam County, Washington, and would occupy from one to two acres. OC has proposed that the converter station be sited within the existing boundary of the Port Angeles Substation on property leased or otherwise transferred from BPA to OC. OC has proposed to begin construction of the HVDC transmission line and converter station by June 2006. Under this schedule, the HVDC system would be interconnected to the FCRTS in the fall of 2007, with a proposed operation date of December 2007. Once constructed, all existing land use and

3

Western Area Power Administration Flatiron-Erie 115-kilovolt Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

65 65 Federal Register / Vol. 60, No. 161 / Monday, August 21, 1995 / Notices biomedical technology, and computational biology. One of the components of these programs deals with correctly assessing the dose to various systems that are exposed to radiation fields during treatment. These systems could range from biomolecules to different tissues and organs. The exposure to both patients and health care providers results from such sources as neutrons, high LET radiation, and low LET radiation such as electrons, x- rays, and gamma rays. In many situations, radiation could be combinations of the various radiation fields listed above. For example, development of improved methods for determination of dose to normal vs. cancerous tissue, and of strategies for maximizing the dose to cancerous tissue

4

Central Ferry Lower Monumental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Wind Projects Central Ferry Lower Monumental Transmission Line Project BPA will build a new 500-kilovolt (kV) transmission line from BPA's Central Ferry...

5

Construction of Central Ferry-Lower Monumental Transmission Line...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

power line capabilities include transmission, overhead and underground distribution and substation projects. BPA also will be holding two "Meet the Builder" open-houses in late...

6

Central Ferry-Lower Monumental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects Spacer Damper Replacement Program Wind Projects Central Ferry-Lower Monumental BPA will build a new 500-kilovolt (kV) transmission line from BPA's Central Ferry...

7

Microsoft Word - Libby Troy FEIS TAC Master 5-7-08.doc  

Broader source: Energy.gov (indexed) [DOE]

Rebuild of the Libby (FEC) to Troy Section of Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement Bonneville Power Administration May 2008 Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA); U. S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project, DOE/EIS - 0379 State Involved: Montana Abstract: The Libby-Troy transmission line, which is the 17-mile section of the 115-kilovolt (kV) transmission line that extends

8

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

9

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

10

EIS-0379: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, Rebuilding Transmission Line between Libby and Troy, Lincoln County, Montana DOE/EIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, 72 FR 39808 (July 2007) More Documents & Publications EIS-0394: EPA Notice of Availability of the Draft Environmental Impact

11

EIS-0379: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

79: EPA Notice of Availability of the Draft Environmental 79: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, Rebuilding Transmission Line between Libby and Troy, Lincoln County, Montana DOE/EIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, 72 FR 39808 (July 2007) More Documents & Publications EIS-0464: EPA Notice of Availability of Final Environmental Impact

12

EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

13

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Western’s project website.

14

Libby-Troy Line Rebuild Project - July 25, 2008  

Broader source: Energy.gov (indexed) [DOE]

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

15

EIS-0451: Hooper Springs Transmission Project, Caribou County, Idaho  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EIS to assess the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line that would extend from BPA's proposed Hooper Springs Substation near Soda Springs, Idaho, to either an existing Lower Valley Energy (LVE) substation or a proposed BPA connection facility that would connect with LVE's existing transmission system in northeastern Caribou County. The proposed new transmission line would be about 22 to 33 miles depending on the route alternative or option.

16

Microsoft Word - Central Ferry-Lower Monumental ROD.doc  

Broader source: Energy.gov (indexed) [DOE]

1 1 Record of Decision March 2011 Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project Record of Decision March 2011 Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Central Ferry-Lower Monumental 500-kilovolt (kV) Transmission Line Project in Garfield, Columbia, and Walla Walla counties, Washington. BPA has decided to implement the Combination A Alternative identified in the Central Ferry-Lower Monumental 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0422, February 2011). The Combination A Alternative consists of constructing a new 500-kV transmission line from BPA's new Central Ferry Substation near the Port of Central Ferry in Garfield County generally west

17

Estes-Flatiron Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

18

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's  

Broader source: Energy.gov (indexed) [DOE]

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana Summary This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy

19

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

20

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Natural gas ferries in Norway.  

E-Print Network [OSTI]

??This paper studies the emergence of natural gas powered ferries in Norway and their diffusion as a means to reaching the goals of reducing NOx… (more)

Myklebust, Benjamin

2006-01-01T23:59:59.000Z

22

Alabama Nuclear Profile - Browns Ferry  

U.S. Energy Information Administration (EIA) Indexed Site

Browns Ferry" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date"...

23

EIS-0379: Notice of Intent to Prepare an Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

: Notice of Intent to Prepare an Environmental Impact : Notice of Intent to Prepare an Environmental Impact Statement EIS-0379: Notice of Intent to Prepare an Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line, Libby, Lincoln County, Montana BPA intends to prepare an EIS on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. DOE/EIS-0379, Bonneville Power Administration, Notice of Intent to prepare

24

City of Bonners Ferry, Idaho (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Bonners Ferry, Idaho (Utility Company) Bonners Ferry, Idaho (Utility Company) Jump to: navigation, search Name City of Bonners Ferry Place Idaho Utility Id 1956 Utility Location Yes Ownership M NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Distribution Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Interdepartmental with Demand: B1PI Industrial Interdepartmental with Demand: B1PO Industrial Interdepartmental with Demand: B3PI Industrial Interdepartmental with Demand: B3PO Industrial Interdepartmental: S1PI Commercial

25

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

26

Fermilab | Tritium at Fermilab | Ferry Creek Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(click chart for larger version) shows the levels of tritium in Ferry Creek on the Fermilab site since April 2006. To date, Fermilab has not detected tritium in Ferry Creek. The...

27

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/17/01)  

Broader source: Energy.gov (indexed) [DOE]

A N U A R Y 2 0 0 1 A N U A R Y 2 0 0 1 SHELTON-KITSAP TRANSMISSION LINE REBUILD Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1342 DEPARTMENT OF ENERGY Bonneville Power Administration Shelton-Kitsap Transmission Line Rebuild Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings. Summary: This notice announces Bonneville Power Administration's (BPA) proposal to rebuild its existing Shelton-Kitsap No. 2 115-kilovolt (kV) transmission line as a double-circuit 230-kV line in the existing right-of-way, in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1342) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major

28

500-kV Central Ferry Substation ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Central Ferry Substation in Garfield County, Wash., to BPA's 500-kV Lower Monumental Substation in Walla Walla County, Wash. BPA is currently considering two routing...

29

Microsoft Word - CX_FINAL_Sale_of_Eight_Spans_Tanner_Tap_115-kV_Transmission_Line_to_PSE_6-5-2012_.docx  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan B. Kendall Project Manager -TERR-3 Proposed Action: Sale of Line Mile 1 of the 115-kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B 1.24. Property Transfer Location: King County, Washington; Township 24 North, Range 7 East, Section 36, Willamette Meridian Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to sell to Puget Sound Energy (PSE) the first eight spans of its 115-kV Tanner Tap to Snoqualmie-Lake Tradition #1 transmission line (Tanner Tap-8). Tanner Tap-8, built in 2002, is owned and operated by BPA and located within a 150 feet

30

Reduction of Emissions from a High Speed Ferry | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Emissions from a High Speed Ferry Reduction of Emissions from a High Speed Ferry 2003 DEER Conference Presentation: West Virginia University 2003deerthompson.pdf More Documents &...

31

EIS-0285-SA-136: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1 and 2 115 kilovolt transmission lines from Oregon City Substation to Chemawa Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access...

32

CX-007985: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

CX-007985: Categorical Exclusion Determination Acquisition of Cowlitz County Public Utility District's 115-Kilovolt Transmission Line CX(s) Applied: B1.24 Date: 02242012...

33

CX-008166: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Exclusion Determination Amended: Acquisition of a Portion of Cowlitz County Public Utility District's 115-Kilovolt Transmission Line Washington Way Substation CX(s) Applied:...

34

CX-000010: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

disconnect structures on BPA's Port Angeles-Sappho 1 115-kilovolt transmission line to provide a point of interconnection to Clallam County Public Utility District's...

35

CX-010407: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Categorical Exclusion Determination CX-010407: Categorical Exclusion Determination Electrical District 2 to Saguaro 2 115 Kilovolt Transmission Line Access Road Maintenance...

36

CX-010410: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

CX-010410: Categorical Exclusion Determination Oracle to Tucson 115 Kilovolt Transmission Line, Cross Arm Replacements at Structure 25 and 73 CX(s) Applied: B1.3...

37

CX-011653: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Determination CX-011653: Categorical Exclusion Determination Saguaro-Tucson 115 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 12032013 Location(s):...

38

CX-012092: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Determination CX-012092: Categorical Exclusion Determination Tucson-Apache 115-Kilovolt Transmission Line Structure Stabilization Project CX(s) Applied: B1.3 Date: 09062013...

39

CX-007133: Categorical Exclusion Determination | Department of...  

Office of Environmental Management (EM)

proposes to replace crossarms at structure 536 of its Casa Grande-Saguaro 115-kilovolt transmission line, within Western's existing right-of-way. Western will access the...

40

Preliminary Draft EIS  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement January 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement Bonneville Power Administration January 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany-

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

CX-008693: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

693: Categorical Exclusion Determination CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission...

42

CX-006580: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

0: Categorical Exclusion Determination CX-006580: Categorical Exclusion Determination Wood Pole Replacement Along the Grand Coulee-Okanogan 2 115-Kilovolt Transmission Line CX(s)...

43

Paynes Ferry Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Paynes Ferry Wind Farm Paynes Ferry Wind Farm Jump to: navigation, search Name Paynes Ferry Wind Farm Facility Paynes Ferry Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Exergy Developer Exergy Energy Purchaser Idaho Power Location Twin Falls County ID Coordinates 42.743987°, -114.929464° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.743987,"lon":-114.929464,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

44

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

45

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement March 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement Bonneville Power Administration March 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: The Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany- Eugene 115-kilovolt No. 1 Transmission Line. This line extends from the Albany Substation in the City of

46

Microsoft Word - Central Ferry Fiber Project CX.doc  

Broader source: Energy.gov (indexed) [DOE]

7, 2011 7, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum Glen Van Bergen - TEP-TPP-3 Proposed Action: Central Ferry Fiber Project Budget Information: Work Order # 00223131, Task 03 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems, data processing equipment, and similar electronic equipment." B4.7 "Adding fiber optic cable to transmission structures..." Location: Walla Walla, Columbia, and Garfield counties, WA ï‚· Township 12 North, Range 34 East, Section 3 ï‚· Township 13 North, Range 38 East, Sections 28, 33-36 ï‚· Township 13 North, Range 39 East, Sections 25-29. 31-33 ï‚· Township 13 North, Range 40 East, Sections 11, 12, 14-16, 20, 21, 29, 30

47

Transmission  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission ,... ,...vc- "' ""'\ S I r;. Dr. Jerry Pell, CCM Principal NEP A Document Manager Permitting, Siting, and Analysis (OE-20) Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1 000 Independence A venue SW Washington, D.C. 20585-0001 Subject: Champlain Hudson Power Express Project Submittal of Amendment Application Dear Dr. Pell: February 28, 2012 On January 25, 2010, Transmission Developers, Inc. ("TDI") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit ("Application) in connection with the Champlain Hudson Power Express project ("Project"). The Application proposed to connect clean sources

48

Microsoft Word - CX-Libby-Troy-AR-Revised-FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Dave Forward Road Designer - TELF-TPP-3 Proposed Action: Libby-Troy Access Road Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine Maintenance Location: Lincoln County, MT Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Upgrade and improve access roads from Structures 23/3 through 24/6 on the Libby-Troy section of the Libby-Bonners Ferry No. 1 115-kilovolt (kV) transmission line. Background This project entails improving the several existing access roads along the Libby-Troy section of the Libby-Bonners Ferry No. 1 115-kV transmission line. Action locations for project access and road repair activities will include:

49

Microsoft Word - CX-Colville-Republic-Maintenance-FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFSF-Bell Proposed Action: Routine maintenance on the Colville-Republic No. 1 transmission line PP&A Project No.: 2,139 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Ferry and Stevens counties, Washington; Bonneville Power Administration's (BPA) Bell District Proposed by: BPA Description of the Proposed Action: BPA proposes to replace deteriorating wood pole towers and associated components (e.g. cross arms, insulators, guy anchors, etc.) along its Colville- Republic No. 1, 115-kilovolt transmission line in Ferry and Stevens counties, Washington. This

50

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

existing Tower Road-Alkali 115-kilovolt (kV) transmission line in Gilliam County, Oregon. BPA will construct a tap to allow the Wind Project to interconnect to BPA's transmission...

51

Microsoft Word - AlbanyEugene_ROD-MAP_060112.docx  

Broader source: Energy.gov (indexed) [DOE]

Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Record of Decision June 2012 1 Bonneville Power Administration's Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Record of Decision June 2012 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action Alternative from the Albany-Eugene 115-kilovolt (kV) No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement (EIS) (DOE/EIS-0457, March 2012). The Proposed Action Alternative, which was identified as the agency's preferred alternative in the Final EIS, consists of rebuilding a 32-mile section of the existing Albany-Eugene 115-kV transmission line that extends from the Albany Substation in the City of Albany in Linn County, Oregon, to the Alderwood Tap

52

CX-006242: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

115-Kilovolt Transmission Line Jumper Cable Replacements, Gunnison County, Colorado CX(s) Applied: B4.6 Date: 06142011 Location(s): Gunnsion, CO Office(s): Western...

53

CX-009804: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

115 Kilovolt Transmission Line CX(s) Applied: B4.1, B4.11 Date: 01232013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area...

54

CX-012072: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Archer-Cheyenne North/South 115-kilovolt Transmission Line Structure Replacement CX(s) Applied: B4.13 Date: 03/18/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

55

CX-008386: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Danger Tree Management on Bridgeport to Sydney 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/11/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

56

CX-012084: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Snowy Range-Happy Jack 115-Kilovolt Transmission Line Structure Replacements CX(s) Applied: B1.3 Date: 03/10/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

57

CX-012086: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Wray-Wray Tap 115-Kilovolt Transmission Line Construction CX(s) Applied: B4.12 Date: 02/28/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

58

CX-012078: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Danger Tree Management on the Great Cut Tap 115-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 02/20/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

59

EA-1739: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

(Figure 1-1). This 46-mile, 115-kilovolt1 (kV) transmission line, located between the BPA Bandon Substation and the BPA Rogue Substation in Coos and Curry counties, is old,...

60

Bandon-Rouge Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

115-kilovolt transmission line. The 46-mile long, wood pole line extends from the BPA Bandon substation to the BPA Rogue substation near the town of Nesika Beach in Coos...

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

CX-011210: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Bridgeport-Gering 115-Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): Nebraska, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

62

CX-011211: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Box Butte-Chadron 115-Kilovolt Transmission Line Structure Replacements CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): Nebraska, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

63

CX-011614: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Curecanti-Blue Mesa 115-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 12/04/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

64

CX-008389: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Tree Management on Estes-Pole Hill and Pole Hill-Flatiron 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 03092012 Location(s): Colorado Offices(s): Western Area...

65

CX-008708: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

on the Chehalis-Olympia No. 1 and Chehalis-Mayfield No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05252012 Location(s): Washington, Washington Offices(s):...

66

EIS-0451: Notice of Intent to Prepare an Environmental Impact...  

Energy Savers [EERE]

(NEPA) on the proposed construction, operation, and maintenance of a 115-kilovolt (kV) transmission line and a 138115-kV substation (collectively referred to as the Hooper...

67

CX-010430: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Categorical Exclusion Determination Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale CX(s) Applied: B1.24 Date: 06202013 Location(s): Washington Offices(s):...

68

EA-1950: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington....

69

Northern Wind Project Draft Environmental Assessment Roberts...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Power Administration (Western) Forman-Summit 115 kilovolt (kV) transmission line 7.4 miles north of the Summit Substation. The Project is a federal action under the...

70

PUD No 1 of Ferry County | Open Energy Information  

Open Energy Info (EERE)

Ferry County Ferry County Jump to: navigation, search Name PUD No 1 of Ferry County Place Washington Utility Id 6297 Utility Location Yes Ownership P NERC WECC Yes ISO Other Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service Schedule 200 Single Phase Commercial General Service Schedule 200 Three Phase Commercial Irrigation Service Schedule 300 Commercial Large Power Service Schedule 400 Low Income Senior Citizen Residential Primary Industrial Service 115KV Schedule 600 Industrial Primary Industrial Service Schedule 500 Residential Schedule 100 - Seasonal Single Phase Residential

71

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

11 - 11920 of 26,764 results. 11 - 11920 of 26,764 results. Download Inspection Report: INS-L-12-05 Alleged Ethical and Procurement Concerns at the Office of Nuclear Energy http://energy.gov/ig/downloads/inspection-report-ins-l-12-05 Download EIS-0379: Draft Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line http://energy.gov/nepa/downloads/eis-0379-draft-environmental-impact-statement Download Inspection Report: IG-0668 Concerns Regarding Academic Programs at the Bonneville Power Administration and the Savannah River Operations Office http://energy.gov/ig/downloads/inspection-report-ig-0668 Download Technology Readiness Assessment Report This document has been developed to guide individuals and teams that will

72

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

11 - 11820 of 28,905 results. 11 - 11820 of 28,905 results. Download EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project http://energy.gov/nepa/downloads/eis-0379-epa-notice-availability-draft-environmental-impact-statement Download Audit Report: IG-0468 Facilities Information Management System http://energy.gov/ig/downloads/audit-report-ig-0468 Download Newsletter (February 2009).pub http://energy.gov/management/downloads/newsletter-february-2009pub Download Office of Classification CommuniQué- Year: 2010 Office of Classification newsletters for the year 2010 consisting of the following issues: CommuniQué 2010-1 - March 2010 CommuniQué 2010-2 - April 2010 http://energy.gov/hss/downloads/office-classification-communiqu-year-2010

73

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61 - 10570 of 28,905 results. 61 - 10570 of 28,905 results. Download portfolioJan2006_final_v2.pdf http://energy.gov/cio/downloads/portfoliojan2006finalv2pdf-1 Article V-038: Google Chrome Two Vulnerabilities Two vulnerabilities have been reported in Google Chrome http://energy.gov/cio/articles/v-038-google-chrome-two-vulnerabilities Download EIS-0379- Final Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line, Libby, Lincoln County, Montana http://energy.gov/nepa/downloads/eis-0379-final-environmental-impact-statement Download CX-000242: Categorical Exclusion Determination Recovery Act: 20 Percent Wind by 2030: Overcoming the Challenges CX(s) Applied: A9 Date: 12/17/2009 Location(s): Montana Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

74

EIS-0379 - Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

- Final Environmental Impact Statement - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-FEIS-2008 More Documents & Publications EIS-0379: Draft Environmental Impact Statement

75

EIS-0379 - Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0379 - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement EIS-0379 - Final Environmental Impact Statement This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-FEIS-2008 More Documents & Publications EIS-0379: Draft Environmental Impact Statement

76

Notice of Intent (NOI) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 11, 2005 May 11, 2005 EIS-0375: Advance Notice of Intent to Prepare an Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste May 5, 2005 EIS-0379: Notice of Intent to Prepare an Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line, Libby, Lincoln County, Montana February 14, 2005 EIS-0374: Notice of Intent to Prepare an Environmental Impact Statement Klondike III Wind Project Interconnection, Sherman County, Oregon January 5, 2005 EIS-0238-S1: Notice of Intent to Prepare a Supplemental Environmental Impact Statement to the Final Site-Wide Environmental Impact Statement Continued Operation of the Los Alamos National Laboratory January 5, 2005 EIS-0380: Notice of Intent to Prepare a Supplemental Environmental Impact

77

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

01 - 23910 of 31,917 results. 01 - 23910 of 31,917 results. Download EIS-0236: Record of Decision National Ignition Facility http://energy.gov/nepa/downloads/eis-0236-record-decision-1 Download EIS-0379: Draft Environmental Impact Statement Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line http://energy.gov/nepa/downloads/eis-0379-draft-environmental-impact-statement Download REGISTERING A TECHNICAL STANDARD PROJECT PurposeThis procedure outlines the process for registering a project to develop a DOE Technical Standard, to perform certain periodic updates (revisions, reaffirmations, inactivations for new... http://energy.gov/hss/downloads/registering-technical-standard-project Download DOE-TSPP-4, Registering a Technical Standard Project- July 1, 2009

78

EIS-0379: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

79: Record of Decision 79: Record of Decision EIS-0379: Record of Decision This Record of Decision was issued for Environmental Impact Statement (EIS-0379) that assessed the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy Substation just east of the town of Troy, Montana. EIS-0379-ROD-2008 More Documents & Publications EIS-0379 - Final Environmental Impact Statement

79

Little Ferry, New Jersey: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Ferry, New Jersey: Energy Resources Ferry, New Jersey: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 40.8528777°, -74.0420848° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.8528777,"lon":-74.0420848,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

80

Dobbs Ferry, New York: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Dobbs Ferry, New York: Energy Resources Dobbs Ferry, New York: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 41.0145418°, -73.872635° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.0145418,"lon":-73.872635,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Coal dust exposure among power station workers during normal operations at Hatfield's Ferry Power Station.  

E-Print Network [OSTI]

??Changes in coal composition could produce higher levels of coal dust exposure thanthose found in the past at Hatfield's Ferry Power Station. Air sampling was… (more)

Lewis, Christian S.

2008-01-01T23:59:59.000Z

82

A "Ferris Bueller Style" Look at Small Business Contracting at the  

Broader source: Energy.gov (indexed) [DOE]

A "Ferris Bueller Style" Look at Small Business Contracting at the A "Ferris Bueller Style" Look at Small Business Contracting at the Department of Energy A "Ferris Bueller Style" Look at Small Business Contracting at the Department of Energy November 30, 2010 - 4:14pm Addthis Bill Valdez Bill Valdez Principal Deputy Director What does this mean for me? There are several program opportunities for small businesses within the Department of Energy. Some of the things on offer this year include: top-level attention to small business objectives, increased outreach, APAT reviews, new tools for prime contractors, expanded teaming, and expanded mentoring. As Ferris Bueller said, "Life moves pretty fast. If you don't stop and look around once in a while, you could miss something." At the Department of Energy, the Office of Small and Disadvantaged Business Utilization

83

A "Ferris Bueller Style" Look at Small Business Contracting at the  

Broader source: Energy.gov (indexed) [DOE]

A "Ferris Bueller Style" Look at Small Business Contracting at the A "Ferris Bueller Style" Look at Small Business Contracting at the Department of Energy A "Ferris Bueller Style" Look at Small Business Contracting at the Department of Energy November 30, 2010 - 4:14pm Addthis Bill Valdez Bill Valdez Principal Deputy Director What does this mean for me? There are several program opportunities for small businesses within the Department of Energy. Some of the things on offer this year include: top-level attention to small business objectives, increased outreach, APAT reviews, new tools for prime contractors, expanded teaming, and expanded mentoring. As Ferris Bueller said, "Life moves pretty fast. If you don't stop and look around once in a while, you could miss something." At the Department of Energy, the Office of Small and Disadvantaged Business Utilization

84

CX-000556: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

56: Categorical Exclusion Determination 56: Categorical Exclusion Determination CX-000556: Categorical Exclusion Determination Willoby Substation Construction Project-Weld County, Colorado CX(s) Applied: B4.11 Date: 12/16/2009 Location(s): Weld County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration proposes to construct the new 115-kilovolt Willoby Substation in Weld County, Colorado. The proposed substation would replace the Prospect Valley Tap structures at the juncture of the existing Kiowa Creek-Well 115-kilovolt transmission line and the Prospect Valley-Prospect Valley Tap 115-kilovolt transmission line. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000556.pdf More Documents & Publications CX-010549: Categorical Exclusion Determination

85

Eric Moulton, Ferri Hassani, Pejman Nekoovaght Microwave-Assisted Heating in Rock  

E-Print Network [OSTI]

Eric Moulton, Ferri Hassani, Pejman Nekoovaght Microwave-Assisted Heating in Rock INTRODUCTION to expensive replacements. Expansive heating through microwaves breaks up the rock, which reduces the stress the mechanisms and parameters governing the heating rate of a material. Department of Mining and Materials

Barthelat, Francois

86

CX-011831: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Wood Pole Replacements Along the Targhee Tap and Targhee-Drummond 115-kilovolt (kV) Transmission Line Rights-Of-Way CX(s) Applied: B1.3 Date: 01/29/2014 Location(s): Idaho Offices(s): Bonneville Power Administration

87

CX-011858: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Beaver Creek-Sterling 115 Kilovolt Transmission Line Structure Relocation, Morgan County, Colorado CX(s) Applied: B4.13 Date: 01/21/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

88

CX-012356: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Lovell-Yellowtail No. 1 115-kilovolt Transmission Line Culvert Replacement Project, Big Horn County, Wyoming CX(s) Applied: B1.3 Date: 07/01/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

89

CX-010108: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Danger Tree Management on Curecanti-Crystal, 115 Kilovolt Transmission Line Danger Tree and Vegetation Management CX(s) Applied: B1.3 Date: 04/25/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

90

CX-012217: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Deering Lake-Eckley 115 Kilovolt Transmission Line Structure Replacements, Yuma County, Colorado CX(s) Applied: B1.3 Date: 05/19/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

91

CX-012213: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Boysen-Thermopolis 115 Kilovolt Transmission Line Structure Replacement Project, Hot Springs and Fremont Counties, Wyoming CX(s) Applied: B1.3 Date: 05/16/2014 Location(s): Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

92

CX-011857: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Archer-Cheyenne North/South 115 Kilovolt Transmission Line Structure Replacement, Laramie County, Wyoming CX(s) Applied: B4.13 Date: 01/28/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

93

CX-012083: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Rosedale-Willowby-Kiowa Creek 115-Kilovolt Transmission Line Wood H-Structure Replacement CX(s) Applied: B1.3 Date: 04/10/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

94

CX-010885: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Kiowa Creek-Weld 115-Kilovolt Transmission Line Culvert Replacement CX(s) Applied: B1.3, B1.33 Date: 08/06/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

95

CX-009709: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration

96

EA-1973: Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EA to assess the potential environmental impacts of funding the Kootenai Tribe of Idaho to restore portions of the Kootenai River near the town of Bonners Ferry, Idaho. The proposed project involves installing structures on the river banks, excavating areas in the river to create deeper pools, and developing and enhancing islands that would be planted with native vegetation.

97

"1. Browns Ferry","Nuclear","Tennessee Valley Authority",3309  

U.S. Energy Information Administration (EIA) Indexed Site

Alabama" Alabama" "1. Browns Ferry","Nuclear","Tennessee Valley Authority",3309 "2. James H Miller Jr","Coal","Alabama Power Co",2675 "3. Barry","Coal","Alabama Power Co",2575 "4. E C Gaston","Coal","Alabama Power Co",1878 "5. H Allen Franklin Combined Cycle","Gas","Southern Power Co",1815 "6. Joseph M Farley","Nuclear","Alabama Power Co",1734 "7. Widows Creek","Coal","Tennessee Valley Authority",1604 "8. Colbert","Coal","Tennessee Valley Authority",1574 "9. E B Harris Electric Generating Plant","Gas","Southern Power Co",1269

98

CX-001121: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

121: Categorical Exclusion Determination 121: Categorical Exclusion Determination CX-001121: Categorical Exclusion Determination Transmission Line Structure Relocation of Existing Oracle-Tucson 115-kilovolt Transmission Line CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Relocate part of Oracle-Tucson 115 kilovolt transmission line in cooperation with Pima County Department of Transportation for their La Canada Drive roadway expansion. This project involves removing 17 existing transmission line pole structures, and will furnish and install 17 new monopoles in a new location within within Western's right-of-way. Western will be using existing access roads and vehicles such as an auger, pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and

99

CX-008377: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

377: Categorical Exclusion Determination 377: Categorical Exclusion Determination CX-008377: Categorical Exclusion Determination Alcova-Casper North 115 Kilovolt Transmission Line Pole Replacements CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration's (Western) Casper Field Office proposes to replace deteriorating poles on 18 wood H-frame structures along its Alcova-Casper North 115 kilovolt (kV) transmission line. The project structures are located on the transmission line between Township 33 North, Range 80 West, Section 12 and Township 30 North, Range 82 West, Section 18, 6th Principle Meridian near Casper, Wyoming in Natrona County. CX-008377.pdf More Documents & Publications CX-010551: Categorical Exclusion Determination

100

CX-000555: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

555: Categorical Exclusion Determination 555: Categorical Exclusion Determination CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration proposes to conduct vegetation management activities within the 125-foot transmission line right-of-way and perform maintenance on existing access roads along the Boysen-Pilot Butte 115-kilovolt transmission line in Fremont County, Wyoming. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000555.pdf More Documents & Publications CX-004456: Categorical Exclusion Determination CX-009801: Categorical Exclusion Determination

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

CX-006298: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

298: Categorical Exclusion Determination 298: Categorical Exclusion Determination CX-006298: Categorical Exclusion Determination Interconnection of the Letcher to Mitchell 115 Kilovolt Transmission Line to Western's Letcher Substation CX(s) Applied: B4.11 Date: 07/08/2011 Location(s): Montana Office(s): Western Area Power Administration-Upper Great Plains Region Interconnection of Northwestern Energy's 115 kilovolt Letcher to Mitchell transmission line at Western's Letcher substation. Northwestern Energy is proposing to build a 14.5 mile transmission line between their Mitchell substation and Western's Letcher substation to shore up reliability of their electrical system in the area. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006298.pdf More Documents & Publications CX-006303: Categorical Exclusion Determination

102

CX-003195: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

95: Categorical Exclusion Determination 95: Categorical Exclusion Determination CX-003195: Categorical Exclusion Determination Oracle-Tucson 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B4.13 Date: 06/10/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to relocate 5 steel monopole transmission line structures on our Oracle-Tucson 115-kilovolt transmission line to accommodate Federal Highway Administration's La Canada Road Widening Project in Tucson. This project involves removing structures 19/4, 19/11, 20/1, 20/2, 20/3, and furnishing and installing 5 new steel monopoles and foundations in a new location within Western's Right of Way. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

103

EIS-0159: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Record of Decision 9: Record of Decision EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado The Department of Energy (DOE), Western Area Power Administration (Western) has prepared this Record of Decision (ROD) pursuant to regulations of the Council on Environmental Quality (40 CFR Part 1505) and Implementing Procedures of the Department of Energy (10 CFR Part 1021). This ROD is based upon the information contained in the ''Final Environmental Impact Statement, Flatiron-Erie 115-kV Transmission Line, Larimer, Boulder & Weld Counties, Colorado'' (DOE/EIS-0159). Western has considered all public and regulatory comments received on the final EIS in preparation of this ROD. DOE/EIS-0159, Western Area Power Administration Flatiron-Erie 115-kilovolt

104

EIS-0159: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

159: Record of Decision 159: Record of Decision EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado The Department of Energy (DOE), Western Area Power Administration (Western) has prepared this Record of Decision (ROD) pursuant to regulations of the Council on Environmental Quality (40 CFR Part 1505) and Implementing Procedures of the Department of Energy (10 CFR Part 1021). This ROD is based upon the information contained in the ''Final Environmental Impact Statement, Flatiron-Erie 115-kV Transmission Line, Larimer, Boulder & Weld Counties, Colorado'' (DOE/EIS-0159). Western has considered all public and regulatory comments received on the final EIS in preparation of this ROD. DOE/EIS-0159, Western Area Power Administration Flatiron-Erie 115-kilovolt

105

CX-006303: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

03: Categorical Exclusion Determination 03: Categorical Exclusion Determination CX-006303: Categorical Exclusion Determination Interconnection of the Pronghorn Gas Plant 115 Kilovolt Transmission Line CX(s) Applied: B4.11 Date: 07/14/2011 Location(s): Montana Office(s): Western Area Power Administration-Upper Great Plains Region In order to bring power into Western's substation, Upper Missouri and Roughrider must interconnect their Pronghorn substation, located in SEC 17 T140N R99W, to the proposed South Heart substation, located in SEC20 T140N R98W, and then the South Heart substation to Western's Belfield substation, located in SEC20 T140N R98W. This would be accomplished by building a roughly eight mile stretch of 115-kilovolt (kV) transmission line east-west between Pronghorn and South Heart, and a north-south tie-line of less than

106

CX-003086: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Categorical Exclusion Determination 6: Categorical Exclusion Determination CX-003086: Categorical Exclusion Determination Improvement of Access Roads on the Cougar-Thurston Number 1 115-Kilovolt and the Thurston-McKenzie Number 1 115-Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 06/25/2010 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to improve existing access roads for the Cougar-Thurston and the Thurston-McKenzie transmission lines in Lane County, Oregon. The project includes blading, rocking, and installing proper drainage for the existing access roads that are degraded with rutting, erosion, cut bank destabilization, and improper surface water drainage characteristics. All road maintenance will take place within the

107

CX-004254: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

254: Categorical Exclusion Determination 254: Categorical Exclusion Determination CX-004254: Categorical Exclusion Determination Seven Mile Project CX(s) Applied: B1.11, B4.6, B4.11 Date: 10/07/2010 Location(s): Linn County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace a line disconnect switch, replace an existing Potential Transformer (PT), and install one new PT at tower 6/8 on the Albany- Lebanon Number 1 115-kilovolt Transmission Line in Linn County, Oregon. In addition, tower 8/6 on the Albany-Lebanon No. 1 115-kilovolt Transmission Line will be moved roughly 40 feet back-on-line and a new line disconnect switch (plus stand) will be installed approximately 12 feet ahead-of-line relative to the present location of tower 8/6. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

108

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2, 2012 2, 2012 CX-009440: Categorical Exclusion Determination State Energy Plan Council School District Woody Biomass Project CX(s) Applied: B5.1, B5.5 Date: 07/02/2012 Location(s): Idaho Offices(s): Golden Field Office July 2, 2012 CX-008782: Categorical Exclusion Determination Danger Tree Management on North Gunnison to Skito 115 Kilovolt Transmission Line Gunnison County, Colorado CX(s) Applied: B1.3 Date: 07/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region July 2, 2012 CX-008781: Categorical Exclusion Determination Danger Tree Management on Curecanti to Blue Mesa 115 Kilovolt Transmission Line Gunnison County, Colorado CX(s) Applied: B1.3 Date: 07/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

109

CX-003196: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

196: Categorical Exclusion Determination 196: Categorical Exclusion Determination CX-003196: Categorical Exclusion Determination Emergency Crossarm Replacement at Structure 39/7 and Access Road Maintenance along the Existing Tucson-Apache 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B1.3 Date: 07/08/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to conduct Emergency Crossarm Replacement at Structure 39/7 and Access Road Maintenance along the existing Tucson-Apache 115-kilovolt transmission line. This will consist of blading and leveling out areas of the existing access road using a dozer and bucket trucks, crew trucks and pickup trucks to replace the crossarm at the structure. This work is necessary to maintain the safety and

110

CX-008400: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CX-008400: Categorical Exclusion Determination CX-008400: Categorical Exclusion Determination CX-008400: Categorical Exclusion Determination Estes Park to Mary's Lake West 115 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 05/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to replace two existing wood H-frame structures along the Estes Park to Mary's Lake West 115 kilovolt transmission line. The structures are located on private land near the community of Mary's Lake in Larimer County, Colorado. CX-008400.pdf More Documents & Publications CX-008386: Categorical Exclusion Determination CX-008381: Categorical Exclusion Determination CX-008389: Categorical Exclusion Determination

111

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

41 - 4250 of 9,640 results. 41 - 4250 of 9,640 results. Download CX-008708: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Olympia No. 1 and Chehalis-Mayfield No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/25/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008708-categorical-exclusion-determination Download CX-008709: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008709-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination

112

CX-004742: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

742: Categorical Exclusion Determination 742: Categorical Exclusion Determination CX-004742: Categorical Exclusion Determination De Moss-Fossil 115-Kilovolt Line Upgrade CX(s) Applied: B4.6 Date: 12/13/2010 Location(s): Wasco County, Oregon Office(s): Bonneville Power Administration Work at the De Moss Substation would entail expanding the existing substation yard to accommodate a new 4-terminal ring bus. Excavation within an area approximately 160-feet (ft) by 242-ft adjacent to the existing control house would be required to construct foundations. The project would also entail the construction of approximately 200 feet of new 115-kilovolt transmission line between the De Moss Substation and the nearby Gordon Hollow Tap. The construction of the new transmission line would entail the construction of two new wood pole structures, which would entail auguring a

113

CX-006816: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

816: Categorical Exclusion Determination 816: Categorical Exclusion Determination CX-006816: Categorical Exclusion Determination Line and Load Interconnection of Coos-Curry Electric Cooperative?s New Substation to Bonneville Power Administration?s Fairview-Bandon 115-Kilovolt Transmission Line CX(s) Applied: B4.6, B4.10 Date: 09/26/2011 Location(s): Coos County, Oregon Office(s): Bonneville Power Administration In response to the line and load interconnection request submitted by Coos-Curry, Bonneville Power Administration (BPA) proposes to provide and install tap jumpers between BPA?s Fairview-Bandon 115-kilovolt (kV) transmission line and Coos-Curry?s new 115/24.9-kV substation. The tap jumpers would consist of line extensions from the BPA Fairview-Bandon #1 115-kV line to the Coos-Curry conductors terminated on the "H" frame wood

114

CX-000602: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

02: Categorical Exclusion Determination 02: Categorical Exclusion Determination CX-000602: Categorical Exclusion Determination Tillamook-Oceanside, 115-kilovolt Substation Interconnection CX(s) Applied: B4.6 Date: 01/07/2010 Location(s): Tillamook County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) substation terminal at Bay 6 of BPA's Tillamook Substation in order to accommodate Tillamook Public Utility District's (PUD's) request to interconnect its new Oceanside 115-kV transmission line. Relay and metering devices will compose the new terminal at Bay 6 where BPA will connect the last span of Tillamook PUD's new Oceanside 115-kV line. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000602.pdf More Documents & Publications

115

CX-008382: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

82: Categorical Exclusion Determination 82: Categorical Exclusion Determination CX-008382: Categorical Exclusion Determination Bridgeport-Sidney 115 Kilovolt Line Rejected Pole Replacement CX(s) Applied: B1.3 Date: 03/16/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) regularly inspects the structures that support our transmission lines and occasionally needs to replace structures that have failed these inspections. To avoid an outage caused by the failure of shell rotted poles, Western will conduct pole replacements on three structures in the Bridgeport-Sidney 115 kilovolt line. The structure numbers are 134, 24, and 14. The work will be done in mid- summer 2012 to avoid disrupting the landowner's wheat harvest.

116

Categorical Exclusion Determinations: American Recovery and Reinvestment  

Broader source: Energy.gov (indexed) [DOE]

Categorical Exclusion Determinations: American Recovery and Categorical Exclusion Determinations: American Recovery and Reinvestment Act Related Categorical Exclusion Determinations: American Recovery and Reinvestment Act Related Categorical Exclusion Determinations issued for actions related to the the American Recovery and Reinvestment Act of 2009. DOCUMENTS AVAILABLE FOR DOWNLOAD June 28, 2010 CX-002841: Categorical Exclusion Determination Texas Propane Fleet Pilot Program (Summary Categorical Exclusion) CX(s) Applied: A7, B5.1 Date: 06/28/2010 Location(s): Texas Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 25, 2010 CX-003086: Categorical Exclusion Determination Improvement of Access Roads on the Cougar-Thurston Number 1 115-Kilovolt and the Thurston-McKenzie Number 1 115-Kilovolt Transmission Lines

117

Transmission Investment: A Primer  

SciTech Connect (OSTI)

This primer highlights recent trends in transmission investment, summarizes the division of jurisdictional authority over transmission, and presents four alternative models for transmission ownership. (author)

McGarvey, Joe

2006-10-15T23:59:59.000Z

118

Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at...

119

Petrology and hydrocarbon potential of carbonate beds within Ferry Lake Anhydrite, Caddo-Pine Island field, Caddo Parish, Louisiana  

SciTech Connect (OSTI)

The Ferry Lake Anhydrite was deposited within a stratopycnal free-flow exchange basin, which functioned as a broad lagoon behind the Stuart City Reef. Alternating restriction and circulation with open marine waters led to the deposition of cyclical gypsum and carbonate beds. Freshwater clastic influx led to the deposition of siliciclastic shale beds also found within the formations. Increased circulation of normal salinity waters into the lagoon may have been facilitated by a rising sea level, autoclastic destruction of the reef from storms, or destruction of the reef framework from the hypersaline lagoonal water. Hydrocarbon production has been established in Caddo-Pine Island field from a thin carbonate bed. Haygood limestone, found near the base of the Ferry Lake Anhydrite. The Haygood limestone is an intraclastic/bioclastic grainstone-packstone that was deposited as an intertidal shoal during a period of increased circulation of open marine water. Two additional carbonate beds that are separated from the Haygood limestone by thin anhydrite beds also were cored during the development of the field. These two beds, the A member and the B member, were deposited as peritidal carbonate facies within subtidal to supratidal settings. Facies relationships in the B member record deposition from storm activity.

Kimball, C.E. (Applied Earth Sciences, Houston, TX (USA)); Young, L.M.; Anderson, E.G. (Northeast Louisiana Univ., Monroe (USA)); Sartin, A.A. (Centenary College of Louisiana, Shreveport (USA))

1989-09-01T23:59:59.000Z

120

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Transmission | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Transmission Transmission Below are resources for Tribes on transmission. Transmission 101 Presentation from the National Council on Electricity Policy's Transmissions Technologies workshop. Includes information on transmission technology, costs, and how to plan the system. Transmission on Tribal Land Basics The Tribal Energy and Environmental Information Clearinghouse provides resources for development on tribal lands. Topics covered include transmission technology basics, potential impacts, law and regulations, and tribal incentives. Transmission Pre-Feasibility Study for Tribes Presentation on the components of a pre-feasibility study including generation location, sizing, and desirability, ability and cost to deliver, capacity versus energy, time of delivery versus peak, request for

122

EA-1591: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1591: Finding of No Significant Impact Palisades - Goshen Transmission Line Reconstruction Project The Bonneville Power Administration (BPA) announces its environmental findings on the Palisades-Goshen Transmission Line Reconstruction Project. The project involves rebuilding the existing Palisades-Goshen 115-kilovolt (kV) transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. Palisades-Goshen Transmission Line Reconstruction Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings More Documents & Publications EA-1591: Final Environmental Assessment, Finding of No Significant Impact, and Mitigation Action Plan

123

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

124

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

125

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

126

National Transmission Grid Study  

Broader source: Energy.gov (indexed) [DOE]

Grid Study Grid Study U.S. Department of Energy The Honorable Spencer Abraham Secretary of Energy May 2002 ii National Transmission Grid Study National Transmission Grid Study i ii National Transmission Grid Study National Transmission Grid Study iii How This Study Was Conducted The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity transmission grid and to identify transmission bottlenecks and measures to address them. DOE began by conducting an independent analysis of U.S. electricity markets and identifying transmission system bottlenecks using DOE's Policy Office Electricity Modeling System (POEMS). DOE's analysis, presented in Section 2, confirms the central role of the nation's transmission

127

Transmission | Open Energy Information  

Open Energy Info (EERE)

Gateway Gateway Edit History Facebook icon Twitter icon » Transmission (Redirected from Transmission) Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage electricity is "stepped down" to a lower voltage, which can be carried

128

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

129

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

130

Transmission Utilization Group (TUG)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Intertie Initiatives Intertie Open Season Transmission Utilization...

131

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

132

Underground Power Transmission  

Science Journals Connector (OSTI)

...The type of transmission line for a particular...will force rt transmission lines to be ground near...history of power transmission shows that d-c...characteristics of a d-c line, it is easy to...Best data fit III II I...

P. H. Rose

1970-10-16T23:59:59.000Z

133

Vice President, Transmission Marketing & Sales  

Broader source: Energy.gov [DOE]

Within Transmission Services at Bonneville Power Administration (BPA), Transmission Marketing and Sales (TS) provides open access to the Federal Transmission System (FTS) consistent with...

134

Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Gateway Edit History Facebook icon Twitter icon » Transmission Jump to: navigation, search Transmission header.png Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry large amounts of electricity at high voltages, typically 115 to 500 kilovolts (kV), across long distances. Networks of transmission lines transfer electricity from power plants or other interconnections to substations. At substations, the high-voltage

135

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

136

Stream Control Transmission Protocol  

Science Journals Connector (OSTI)

This document describes the Stream Control Transmission Protocol (SCTP). SCTP is designed to transport PSTN signaling messages over IP networks, but is capable of broader applications.

R. Stewart; Q. Xie; K. Morneault; C. Sharp; H. Schwarzbauer; T. Taylor; I. Rytina; M. Kalla; L. Zhang; V. Paxson

2000-10-01T23:59:59.000Z

137

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

138

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

139

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

140

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

142

Transmission Access Resources  

Broader source: Energy.gov [DOE]

Historically, the addition of new electric generation facilities has been accompanied by new transmission systems. For example, large nuclear and coal plants built in the 1960s and 1970s required...

143

Performance Incentives for Transmission  

E-Print Network [OSTI]

The Federal Energy Regulatory Commission's Standard Market Design Notice of Public Rule- making (SMD NOPRPerformance Incentives for Transmission FERC's Standard Market Design should accommodate of California at Berkeley. The research described in this article was supported by National Grid, USA

Oren, Shmuel S.

144

Designing electricity transmission auctions  

E-Print Network [OSTI]

The UK has ambitious plans for exploiting offshore wind for electricity production in order to meet its challenging target under the EU Renewable Energy Directive. This could involve investing up to 20bn in transmission assets to bring electricity...

Greve, Thomas; Pollitt, Michael G.

2012-10-26T23:59:59.000Z

145

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

146

Audio Transmission Systems  

Science Journals Connector (OSTI)

Audio transmission systems are the means by which audio signals are routed, processed, and assigned to the desired monitor and recording output channels. In the early days of electrical recording, rarely more ...

John Eargle

1986-01-01T23:59:59.000Z

147

Transmission Grid Integration  

Broader source: Energy.gov [DOE]

The levels of solar energy penetration envisioned by the DOE SunShot Initiative must be interconnected effectively onto the transmission grid. This interconnection requires an in-depth...

148

Honda Transmission Technical Center  

High Performance Buildings Database

Russells Point, OH The Honda Transmission Technical Center is located on the Honda of America Manufacturing Plant facility site in Russells Point, Ohio. This facility is used for product engineering and market quality testing and analysis of automatic transmissions. The building contains a large workshop area for ten cars, a future dynamometer, two laboratories, an open office area, three conference rooms, a break room, restrooms, and related support areas.

149

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

150

Open Access Transmission Tariff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission | OATT Transmission | OATT Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Western Open Access Transmission Service Tariff Revision Western Area Power Administration submitted its revised Open Access Transmission Service Tariff with the Federal Energy Regulatory Commission on Sept. 30, 2009. The tariff became effective on Dec. 1, 2009, as modified by Western's March 2, 2011 compliance filing. The revised tariff was developed to comply with FERC Order No. 890 and to be consistent with Western's statutory and regulatory requirements. It addresses changes in transmission services and planning. FERC issued an order on Dec. 2, 2010, granting Western's petition for a Declaratory Order approving the tariff as an acceptable reciprocity tariff, subject to Western making a compliance filing within 30 days to address items in Attachment C, Attachment P and Attachment Q. Western made its compliance filing on March 2, 2010, addressing FERC's Dec. 2, 2010, order. FERC accepted Western's March 2, 2011 compliance filing on April 25, 2011. Western has made several ministerial filings to its OATT as part of FERC's eTariff viewer system, the last of these was approved on March 29, 2013. Further detail can be found in the links below.Current OATT

151

Colorado/Transmission/Agencies | Open Energy Information  

Open Energy Info (EERE)

Agencies < Colorado | Transmission Jump to: navigation, search Colorado Transmission Roadmap Agency Links Local Regulations State Regulations Summary General Transmission...

152

National Electric Transmission Congestion Study Webinars | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study National Electric Transmission Congestion Study Webinars National Electric Transmission Congestion Study Webinars The Department...

153

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

154

Electricity Transmission, A Primer | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission, A Primer Electricity Transmission, A Primer This primer on electric transmission is intended to help policymakers understand the physics of the transmission system,...

155

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

156

transmission | OpenEI  

Open Energy Info (EERE)

transmission transmission Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (9 months ago) Date Updated March 04th, 2013 (9 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

157

NREL: Energy Analysis: Transmission Infrastructure  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Infrastructure Transmission Infrastructure Grid expansion and planning to allow large scale deployment of renewable generation Large scale deployment of renewable electricity generation will require additional transmission to connect renewable resources, which are wide-spread across the US, but regionally-constrained, to load centers. Long-term transmission planning, based on potential future growth in electric loads and generation resource expansion options, is critical to maintaining the necessary flexibility required for a reliable and robust transmission system. NREL's analyses support transmission infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. NREL's transmission infrastructure expansion and planning analyses show

158

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

159

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

160

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Electric Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

Lauren Azar Lauren Azar Senior Advisor to Secretary Chu November 2, 2012 Electric Transmission System Workshop We all have "visions," in one form or another: * Corporations call them strategic plans * RTOs ... transmission expansion plans or Order 1000 plans * State PUCs ... integrated resource plans * Employees ... career goals Visions for the Future Artist: Paolo Frattesi Artist: Paolo Frattesi Uncertainty = changing industry Changes in technology, threats and policies Can we make decisions in the face of change? .......How can we not? Can we agree on several key design attributes for the future grid? Taking Action in the Face of Uncertainty Step 1: Establish common ground on key design attributes GTT's Proposed Key Design Attributes:

162

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

163

Microsoft Word - WWTR_FONSI05162011.doc  

Broader source: Energy.gov (indexed) [DOE]

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Finding of No Significant Impact May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Finding of No Significant Impact Walla Walla-Tucannon Transmission Line Rebuild Project DEPARTMENT OF ENERGY Bonneville Power Administration Finding of No Significant Impact and Floodplain Statement of Findings DOE EA-1731 Summary: Bonneville Power Administration (BPA) announces its environmental findings on the Walla Walla-Tucannon River Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Walla Walla-Tucannon River 115- kilovolt (kV) transmission line, which was built in 1940. The 47-mile-long transmission line is

164

Transmission SEAB Presentation  

Broader source: Energy.gov (indexed) [DOE]

Overcoming Overcoming Institutional Barriers to Infrastructure Development Lauren Azar Senior Advisor to the Secretary U.S. Department of Energy January 31, 2012 Lauren"s Initiatives 1. Rapid Response Team for Transmission 2. Power Marketing Administrations 3. Project Development in the Southwest 4. Congestion Study and NIETC Designations 5. Miscellaneous  EPA Regulations  Market Power

165

Continuously variable transmission  

SciTech Connect (OSTI)

This patent describes a power transmission apparatus. It comprises: a body, a pinion gear, a cam means, first and second gear rack pairs, preventing means;l first and second rack support means, a rotor mounted for rotation about a rotor axis, the rotor having rotor engaging means for engaging the rack support means so as to transmit power therebetween.

Irvin, P.J.E.

1992-07-14T23:59:59.000Z

166

Autonomous data transmission apparatus  

DOE Patents [OSTI]

A autonomous borehole data transmission apparatus for transmitting measurement data from measuring instruments at the downhole end of a drill string by generating pressure pulses utilizing a transducer longitudinally responsive to magnetic field pulses caused by electrical pulses corresponding to the measured downhole parameters.

Kotlyar, Oleg M. (4675 W. 3825 S, Salt Lake City, UT 84120)

1997-01-01T23:59:59.000Z

167

Borehole data transmission apparatus  

DOE Patents [OSTI]

A borehole data transmission apparatus is described whereby a centrifugal pump impeller(s) is used to provide a turbine stage having substantial pressure characteristics in response to changing rotational speed of a shaft for the pressure pulsing of data from the borehole through the drilling mud to the surface of the earth.

Kotlyar, O.M.

1993-03-23T23:59:59.000Z

168

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission and Fuel Gas Transmission Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York) < Back Eligibility Commercial Fuel Distributor Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of the proposed transmission line. The regulations describe application and review

169

EA-1912: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1912: Draft Environmental Assessment Midway-Benton No. 1 Rebuild Project Benton County, WA This EA evaluates the potential environmental impacts of a proposal to rebuild its 115-kilovolt(kV) wood-pole Midway-Benton No. 1 transmission line and the BPA-owned portion of the 115-kV wood-pole Benton-Othello No. 1 transmission line. The lines are aging and require replacing wood-pole structures and other components of the transmission line. The Midway-Benton No. 1 and Benton-Othello No. 1 transmission lines currently follow the 230-kV steel Midway-Benton No. 2 transmission line. At this time, BPA is not proposing any work on the Midway-Benton No. 2 transmission line. Consolidated Draft PEA_5-10-12 More Documents & Publications

170

Microsoft Word - Ch1_PN_040611km  

Broader source: Energy.gov (indexed) [DOE]

Bandon-Rogue Transmission Line Bandon-Rogue Transmission Line Rebuild Project Finding of No Significant Impact May 2011 This page left intentionally blank. Bonneville Power Administration 1 Bandon-Rogue Transmission Line Rebuild Project DEPARTMENT OF ENERGY Bonneville Power Administration Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE EA-1739 Summary: Bonneville Power Administration (BPA) announces its environmental findings on the Bandon-Rogue Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Bandon-Rogue 115-kilovolt (kV) transmission line. The 46-mile-long transmission line is located in Coos and Curry counties in Oregon, extending from the city of Bandon to near Nesika Beach.

171

Transmission Developers Inc.  

Broader source: Energy.gov (indexed) [DOE]

% ~ % ~ Transmission Developers Inc. July 7, 2011 Mr. Anthony J. Como Director, Permitting and Siting Office ofElectricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence A venue SW, Room 8G-024 Washington, D.C. 20585 Subject: Champlain Hudson Power Express Project U.S. Department of Energy Presidential Permit Application PP-362 Dear Mr. Como: On January 25, 2010, Transmission Developers, Inc. ("TDI'' or "Applicants") submitted on behalf of Champlain Hudson Power Express, Inc. ("CHPEI") an application to the U.S. Department of Energy ("DOE") for a Presidential Permit and an amendment on August 5, 2010 (collectively, the "Application") in connection with the Champlain Hudson Power Express

172

Transmission Siting_071508.indd  

Broader source: Energy.gov (indexed) [DOE]

Coordinating Interstate Electric Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate The National Council on Electricity Policy 2 DISCLAIMER: The National Council on Electricity Policy is funded by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The views and opinions expressed herein are strictly those of the authors and may not necessarily agree with the positions of the National Council on Electricity Policy, its committ ee members or the organizations they represent, the National Council funders, or those who commented on the paper during its draft ing. ACKNOWLEDGMENTS Coordinating Interstate Electric Transmission Siting: An Introduction to the Debate was prepared with the fi nancial assistance of a grant from the U.S. Department of Energy (DOE) Offi ce of Electricity Delivery

173

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

174

Patterns of Transmission Investment  

E-Print Network [OSTI]

long term performance contracts with a developer of an HVDC transmission link to expand “interconnection” capacity between TSOs with no or limited interconnections and with large sustained differences in prices. Merchant investments supported... truly separate AC networks. For example, by building HVDC inter-connectors between two separate networks, opportunities to increase trades of power from high price to low priced areas can be exploited. The HVDC link between the England and France...

Joskow, Paul

2006-03-14T23:59:59.000Z

175

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

176

Transmission Line Circuit Alexander Glasser  

E-Print Network [OSTI]

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

177

NREL: Transmission Grid Integration - Transmission Planning and Analysis  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Planning and Analysis Transmission Planning and Analysis Thumbnail of map the United States that shows wind resources and transmission lines. Enlarge image This map shows the location of wind resources and transmission lines in the United States. See a larger image or state maps. NREL researchers are engaged in transmission planning and analysis to strengthen the electric power system through the integration of solar and wind power. As demand for electricity increases, electric power system operators must plan for and construct new generation and transmission lines. However, variable generation such as solar and wind power plants are often located far from the loads they serve. They depend on transmission lines to transport the electricity they produce to load centers. NREL is working with industry and utilities to address issues related to

178

Transmission/Photo Gallery | Open Energy Information  

Open Energy Info (EERE)

Colorado transmission 2.jpg Bird diverters.jpg Transmission insulators.jpg Retrieved from "http:en.openei.orgwindex.php?titleTransmissionPhotoGallery&oldid687595...

179

NREL: Transmission Grid Integration - Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Publications Publications Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL has an extensive collection of publications related to transmission integration research. Explore the resources below to learn more. Selected Project Publications Read selected publications related to these transmission integration projects: Western Wind and Solar Integration Study Eastern Renewable Generation Integration Study Oahu Wind Integration and Transmission Study Flexible Energy Scheduling Tool for Integration of Variable generation (FESTIV) Active power controls Forecasting Grid Simulation. NREL Publications Database NREL's publications database offers a variety of documents related to transmission integration that were written by NREL staff and

180

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EA-1731: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Finding of No Significant Impact Finding of No Significant Impact EA-1731: Finding of No Significant Impact Walla Walla-Tucannon River Transmission Line Rebuild Project Bonneville Power Administration (BPA) announces its environmental findings on the Walla Walla-Tucannon River Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Walla Walla-Tucannon River 115-kilovolt (kV) transmission line, which was built in 1940. The 47-mile-long transmission line is located in Walla Walla and Columbia counties in Washington, extending from the city of Walla Walla to near the town of Dayton. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Final Environmental Assessment

182

EA-1617: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1617: Draft Environmental Assessment Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project Western Area Power Administration, Rocky Mountain Customer Service Region (Western) proposes to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kilovolt (kV) transmission lines, located in Big Horn County, Wyoming and Big Horn and Carbon Counties in Montana and the Basin-Lovell (BA-LV) 115-kV transmission line in Big Horn County, Wyoming. The LV-YT No. 1 and 2 transmission lines parallel each other and are approximately 47 miles in length with termination points at the Yellowtail Substation near Fort Smith, Montana and the Lovell Substation near Lovell, Wyoming. The BA-LV transmission line is approximately 39 miles in length with termination

183

Microsoft Word - Midway-Benton_FONSI_Final.docx  

Broader source: Energy.gov (indexed) [DOE]

Midway-Benton No. 1 Transmission Line Rebuild Project Midway-Benton No. 1 Transmission Line Rebuild Project U.S. Department of Energy Finding of No Significant Impact (FONSI) and Wetland and Floodplain Statement of Findings DOE/EA-1912 Summary Bonneville Power Administration (BPA), in coordination with the U.S. Department of Energy- Richland (DOE-RL), announces its environmental findings on the Midway-Benton No. 1 Transmission Line Rebuild Project (Proposed Action). The Proposed Action would replace the approximately 28.2-mile-long, 115-kilovolt (kV) Midway-Benton No. 1 transmission line and approximately 11 miles of the 115-kV Benton-Othello No. 1 transmission line between the existing Midway and Benton Substations. All of the Proposed Action would be located on the Hanford Site in Benton County, Washington.

184

Transmission Workshop | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE Grid Tech Team » Activities/Outreach » GTT DOE Grid Tech Team » Activities/Outreach » GTT Activities » Transmission Workshop Transmission Workshop Transmission Workshop GTT Transmission Workshop - November 1-2, 2012 On November 1-2, 2012, the GTT presented a workshop on grid integration on the transmission system at the DoubleTree Crystal City near Washington, DC. A draft of the DOE Action Plan Addressing the Electricity Transmission System was discussed during the workshop, which addressed the challenges and opportunities presented by the integration of 21st century energy technologies into the electricity transmission system. Parallel sessions addressed the challenges and opportunities of modernizing the grid and drilled down into key technology areas associated with each of these: System visibility: what advances are needed to "see" the state of

185

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network [OSTI]

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

186

Abstract --Under a context of transmission open access, a methodology to define a common transmission trunk system  

E-Print Network [OSTI]

Terms--Transmission systems, Transmission pricing, Cooperative games, Shapley value, Transmission open

Catholic University of Chile (Universidad Católica de Chile)

187

CX-010686: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Exclusion Determination CX-010686: Categorical Exclusion Determination Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07022013...

188

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

Equipment Transmission Lines 765 kV (no description) 500Montana-Alberta Tie 230 kV Transmission Line: TransmissionMontana-Alberta Tie 230 kV Transmission Line: Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

189

National Electric Transmission Congestion Study: Preliminary...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study: Preliminary Findings National Electric Transmission Congestion Study: Preliminary Findings The Department hosted three webinars in...

190

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery Technologies and Systems - Pipeline Transmission of Hydrogen Hydrogen Delivery...

191

Dynamic Transmission Electron Microscopy  

SciTech Connect (OSTI)

Dynamic transmission electron microscopy (DTEM) combines the benefits of high spatial resolution electron microscopy with the high temporal resolution of ultrafast lasers. The incorporation of these two components into a single instrument provides a perfect platform for in situ observations of material processes. However, previous DTEM applications have focused on observing structural changes occurring in samples exposed to high vacuum. Therefore, in order to expand the pump-probe experimental regime to more natural environmental conditions, in situ gas and liquid chambers must be coupled with Dynamic TEM. This chapter describes the current and future applications of in situ liquid DTEM to permit time-resolved atomic scale observations in an aqueous environment, Although this chapter focuses mostly on in situ liquid imaging, the same research potential exists for in situ gas experiments and the successful integration of these techniques promises new insights for understanding nanoparticle, catalyst and biological protein dynamics with unprecedented spatiotemporal resolution.

Evans, James E.; Jungjohann, K. L.; Browning, Nigel D.

2012-10-12T23:59:59.000Z

192

CX-003092: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

92: Categorical Exclusion Determination 92: Categorical Exclusion Determination CX-003092: Categorical Exclusion Determination Ross-Lexington Number 1 New Access Road Construction: 15/1 to 15/2 CX(s) Applied: B1.13 Date: 06/08/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to conduct access road construction at a specific site along the Ross-Lexington Number 1, 115-kilovolt transmission line. This new access road is needed in order to provide access to transmission structures 15/1 and 15/2. The previous access road is no longer accessible due to property owner restrictions. Unrestricted access to transmission structures is a critical aspect of the Transmission Line Maintenance Program, which helps to insure the safety,

193

EA-1636: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1636: Final Environmental Assessment EA-1636: Final Environmental Assessment EA-1636: Final Environmental Assessment Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project The Bonneville Power Administration (BPA) has proposed replacing wood poles and associated structural components for two of BPA's existing transmission lines that generally share the same transmission line right-of-way - the 115-kilovolt (kV) Albany-Burnt Woods No. 1 transmission line and a portion of the 230-kV Santiam-Toledo No. 1 transmission line, both of which are located in Linn, Benton, and Lincoln Counties, Oregon. DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Preliminary Environmental Assessment (March 2009) More Documents & Publications EA-1636: Mitigation Action Plan EA-1636: Finding of No Significant Impact

194

EA-1456: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

56: Final Environmental Assessment 56: Final Environmental Assessment EA-1456: Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Loveland, Colorado Western Area Power Administration (Western) is proposing to upgrade the existing Cheyenne- Miracle Mile (CH-MM) and Ault-Cheyenne (AU-CH) 115 kilovolt (115-kV ) transmission lines to 230-kV. The proposed project consists of rebuilding these transmission lines and making modifications to Western's existing Miracle Mile, Cheyenne and Ault Substations to accommodate the 230-kV circuits. A new Snowy Range Substation would also be build near Laramie, Wyoming. DOE/EA-1456; Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Western Area Power

195

EA-1731: Mitigation Acton Plan | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1: Mitigation Acton Plan 1: Mitigation Acton Plan EA-1731: Mitigation Acton Plan Walla Walla-Tucannon River Transmission Line Rebuild Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Walla Walla-Tucannon River Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves rebuilding the 47-mile-long 115-kilovolt (kV) transmission line from the existing Walla Walla Substation, located in the city of Walla Walla, Washington, to the existing Tucannon River Substation, located near the town of Dayton, Washington. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Finding of No Significant Impact EA-1731: Final Environmental Assessment

196

Microsoft Word - FONSI master.doc  

Broader source: Energy.gov (indexed) [DOE]

Palisades-Goshen Transmission Line Reconstruction Project Palisades-Goshen Transmission Line Reconstruction Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1591 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Palisades-Goshen Transmission Line Reconstruction Project. The project involves rebuilding the existing Palisades-Goshen 115-kilovolt (kV) transmission line, which extends from Palisades Dam in eastern Idaho approximately 52 miles west to the Goshen Substation south of Idaho Falls, Idaho. BPA has prepared an environmental assessment (DOE/EA-1591) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

197

CX-005383: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

383: Categorical Exclusion Determination 383: Categorical Exclusion Determination CX-005383: Categorical Exclusion Determination Elliot Substation Construction and Transmission Line 43.8kV Transmission Line CX(s) Applied: B4.11 Date: 03/02/2011 Location(s): Elliot, North Dakota Office(s): Western Area Power Administration-Upper Great Plains Region The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, North Dakota to be owned and operated by Western under Western's Valley City to Forman 115-kilovolt (kv)transmission line in addition to 8 miles of new 43.8-kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-005383.pdf More Documents & Publications

198

EA-1644: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Finding of No Significant Impact 4: Finding of No Significant Impact EA-1644: Finding of No Significant Impact Killdeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper MIssouri Generation and Transmission Electric Cooperative (UMGT), has applied to the U.S. Department of Energy Western Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection (Killdeer interconnection) at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission live which would extend about 13 miles northward from Western Killdeer's Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. DOE/EA-1644: Finding of No Significant Impact for the Kildeer to Mountain Transmission Project, Richland County, Montana (06/17/09)

199

Microsoft Word - Creston-Bell FONSI_final_external.docx  

Broader source: Energy.gov (indexed) [DOE]

1 1 Finding of No Significant Impact Creston-Bell Transmission Line Rebuild Project Department of Energy Bonneville Power Administration Finding of No Significant Impact (FONSI) and Wetland and Floodplain Statement of Findings DOE/EA-4406 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Creston-Bell Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Proposed Action is to rebuild the 53.8-mile-long 115-kilovolt (kV) Creston-Bell transmission line, conduct work on access roads, and remove danger trees. The existing 53.8-mile-long transmission line was built in 1942 and extends east from the existing Creston Substation, located in Lincoln County, Washington, to the existing Bell Substation, located in the city of

200

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION  

Broader source: Energy.gov [DOE]

The agenda for the Quadrennial Energy Review (QER) public stakeholder meeting in New Orleans on petroleum product transmission, distribution, and storage.

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Transmission Reliability | Department of Energy  

Energy Savers [EERE]

design, long-term supply and transmission investment, renewable integration, demand response, and environmental impacts. Researchers use models and simulations to assess how...

202

NREL: Transmission Grid Integration - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects NREL's transmission integration projects provide data and models that help utilities and policymakers make informed decisions about the integration of variable generation,...

203

Chapter 4 Transmission Adequacy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Chapter 4 Transmission Adequacy Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed. Chapter 4 Transmission Adequacy More Documents & Publications Draft Chapter 4: Transmission Adequacy

204

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

205

Hydrogen Transmission and Distribution Workshop  

Broader source: Energy.gov [DOE]

Proceedings from the Hydrogen Transmission and Distribution Workshop held February 25-26, 2014, in Golden, Colorado. The objective was to discuss and share information on the research, development, and demonstration needs and challenges for low-cost, effective hydrogen transmission and distribution from centralized production facilities to the point of use.

206

Direct current power transmission systems  

SciTech Connect (OSTI)

This book represents text on HVDC transmission available. It deals with the various aspects of the state of the art in HVDC transmission technology. This book presents many aspects of interactions of AC/DC systems. Modeling and analysis of DC systems are also discussed in detail.

Padiyar, K.R.

1991-01-01T23:59:59.000Z

207

Transmission Reliability | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

208

ITC Transmission | Open Energy Information  

Open Energy Info (EERE)

ITC Transmission ITC Transmission Jump to: navigation, search Name ITC Transmission Place Michigan Utility Id 56068 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=ITC_Transmission&oldid=410858" Categories: EIA Utility Companies and Aliases Utility

209

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

210

Fact #850: December 8, 2014 Automatic Transmissions have closed the Fuel Economy Gap with Manual Transmissions  

Broader source: Energy.gov [DOE]

Historically, manual transmissions have delivered better fuel economy than automatic transmissions. However, improvements in the efficiency of automatic transmissions have closed that gap in recent...

211

CX-007750: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-007750: Categorical Exclusion Determination "Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a multiple use request submitted by the City of Longview, Washington, to construct a paved recreational trail (the Highland Trail) for pedestrian and bicycle use on existing BPA transmission line right-of-way in Longview, Washington. The Highland Trail would be located on existing BPA fee-owned right-of-way property along the BPA Longview-Cowlitz Number 1, 115-kilovolt (kV) transmission line corridor. It would be built within a 70-foot-wide Reserve

212

CX-005936: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

936: Categorical Exclusion Determination 936: Categorical Exclusion Determination CX-005936: Categorical Exclusion Determination Erie to Terry Street and Lyons to Longmont Northwest 115 Kilovolt Transmission Line Structure Replacements, Boulder and Broomfield Counties, Colorado CX(s) Applied: B4.6 Date: 05/16/2011 Location(s): Boulder County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western proposes to replace nine existing wood pole H-frame structures along the Erie-Terry Street and Lyons-Longmont Northwest transmission lines between Longmont and Erie, Colorado. These transmission lines occur on private lands in Boulder and Broomfield counties, Colorado. Structure sites are located in and around the city of Longmont, in rural residential areas and in agricultural fields. The structures will be replaced with similar

213

EA-1644: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1644: Final Environmental Assessment EA-1644: Final Environmental Assessment EA-1644: Final Environmental Assessment Kildeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper Missouri Generation and Transmission Electric Cooperative, Inc. (UMGT), has applied to the U.S. Department of Energy (DOE) Western Area Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission line which would extend about 13 miles northward from Western's Killdeer Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. The Pre-Decisional Environmental Assessment was issued, without changes, as the Final Environmental Assessment.

214

Microsoft Word - Creston-Bell MAP_final.docx  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan Creston-Bell Transmission Line Rebuild Project Department of Energy Bonneville Power Administration Mitigation Action Plan DOE/EA-4406 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Creston-Bell Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves rebuilding the 53.8-mile-long 115-kilovolt (kV) transmission line from the existing Creston Substation, located in Lincoln County, Washington, to the existing Bell Substation, located in the city of Spokane, Washington. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental

215

CX-006290: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-006290: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/25/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace all of the aging wood pole transmission line support structures along the Cardwell-Cowlitz No. 1, 115 kilovolt (kV) transmission line. Due to the age of the wood poles, the work is necessary to improve the safety, operation, and reliability of the transmission line. All wooden pole structures, hardware, and support structures will be replaced in the original location. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006290.pdf More Documents & Publications

216

CX-003620: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

620: Categorical Exclusion Determination 620: Categorical Exclusion Determination CX-003620: Categorical Exclusion Determination Structure 57/2 Relocation on the Lovell-Thermopolis 115 Kilovolt Transmission Line CX(s) Applied: B1.3, B4.6 Date: 08/23/2010 Location(s): Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Power Administration proposes to relocate structure 57/2 on the Lovell-Thermopolis transmission line. The structure is presently located on the bank of the Greybull River, which is quickly eroding. The structure will be moved approximately 30 feet north of its present location, within the existing transmission line right-of-way. The structure is located on Wyoming State lands. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003620.pdf More Documents & Publications

217

CX-004892: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

92: Categorical Exclusion Determination 92: Categorical Exclusion Determination CX-004892: Categorical Exclusion Determination Oracle-Tucson Transmission Line Structure Relocation CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to relocate part of its Oracle-Tucson 115 kilovolt transmission line in cooperation with Pima County Department of Transportation for their La Canada Drive roadway expansion (Pima County Project Number 4LCRRI). This project involves removing 17 existing transmission line pole structures, and will furnish and install 17 new monopoles in a new location within Western's right-of-way. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004892.PDF More Documents & Publications

218

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Windy Gap Firming Project Windy Gap Firming Project Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOE/EIS-0370 (cooperating agency) Western's proposed action is to relocate approximately 3.8 miles of the existing Estes to Lyons 115-kilovolt transmission line, if the Chimney Hollow Reservoir alternative is constructed. The line would be moved outside the area proposed for the reservoir, and Western would ensure the new location would allow the agency to continue to operate and maintain it. Section 2.4.1.4 of the Final Environmental Impact Statement, Volume 1 provides more information on the transmission line relocation proposal. The U.S. Department of the Interior, Bureau of Reclamation is the Lead Agency for the National Environmental Policy Act Review. Cooperating agencies are Western, the U.S. Army Corps of Engineers and Grand County, Colo.

219

Microsoft Word - CX-BadgerCanyon-RichlandNo1_WoodPoles_FY13.docx  

Broader source: Energy.gov (indexed) [DOE]

7, 2013 7, 2013 REPLY TO ATTN OF: KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Walker Miller Electrical Engineer - TPCF-W RICHLAND Proposed Action: Wood pole replacements on the Badger Canyon-Richland #1 transmission line PP&A Project No.: 2670 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities. Location: City of Richland, Benton County, WA Transmission Line/ROW Structure # Township Range Section County, State Badger Canyon-Richland #1 4/9 and 4/10 9N 28E 26 Benton, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA, at the expense of the City of Richland, proposes to raise structures 4/9 and 4/10 of the Badger Canyon-Richland #1 115-kilovolt transmission line to

220

EA-1644: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1644: Finding of No Significant Impact EA-1644: Finding of No Significant Impact EA-1644: Finding of No Significant Impact Killdeer to Mountain Transmission Project McKenzie Electric Cooperative (MEC), through Upper MIssouri Generation and Transmission Electric Cooperative (UMGT), has applied to the U.S. Department of Energy Western Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection (Killdeer interconnection) at Western's Killdeer Substation and a new 115-kilovolt (kV) transmission live which would extend about 13 miles northward from Western Killdeer's Substation to a new MEC Mountain Substation, all in Dunn County, North Dakota. DOE/EA-1644: Finding of No Significant Impact for the Kildeer to Mountain

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

CX-005674: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

674: Categorical Exclusion Determination 674: Categorical Exclusion Determination CX-005674: Categorical Exclusion Determination Portland General Electric Overhead Line Crossing of Keeler-Oregon City CX(s) Applied: B4.9 Date: 04/15/2011 Location(s): Willamette Meridian, Oregon Office(s): Bonneville Power Administration Portland General Electric (PGE) is planning to construct an overhead transmission line to tap into their existing Saint Mary?s Substation from their newly built Cornell Substation. PGE?s new 115-kilovolt transmission line would cross over Bonneville Power Administration's (BPA) Keeler-Oregon City # 2 transmission line at the junction of the line and Oregon State Highway 26. Their plan includes installation of a two-pole H-Frame structure to control conductor height at the crossing. BPA is proposing to

222

CX-006296: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6296: Categorical Exclusion Determination 6296: Categorical Exclusion Determination CX-006296: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance and reconstruction activities along existing access roads, both on and off the right-of-way. The work involves approximately 4.7 miles of road reconstruction or improvement work on or leading to the Cardwell-Cowlitz No. 1, 115- kilovolt transmission line right-of-way between Cardwell Substation and structure 7/8. The roadwork is needed to improve access for crews that will be replacing the transmission line support structures within the transmission line corridor.

223

CX-008791: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

791: Categorical Exclusion Determination 791: Categorical Exclusion Determination CX-008791: Categorical Exclusion Determination Western Area Power Administration and Tri-State Generation and Transmission Association, Inc. Fiber Optic Installation Project From Beaver Creek to Big Sandy Substations Morgan, Washington, and Lincoln Counties, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Washington, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) and Tri-State Generation and Transmission Association, Inc. (Tri-State), propose to install fiber optic cable on an existing 66 mile 115-kilovolt transmission line between Beaver Creek and Big Sandy Substations in Morgan, Washington, and Lincoln Counties, Colorado. CX-008791.pdf

224

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

225

SunShot Initiative: Transmission Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Grid Integration to Transmission Grid Integration to someone by E-mail Share SunShot Initiative: Transmission Grid Integration on Facebook Tweet about SunShot Initiative: Transmission Grid Integration on Twitter Bookmark SunShot Initiative: Transmission Grid Integration on Google Bookmark SunShot Initiative: Transmission Grid Integration on Delicious Rank SunShot Initiative: Transmission Grid Integration on Digg Find More places to share SunShot Initiative: Transmission Grid Integration on AddThis.com... Concentrating Solar Power Photovoltaics Systems Integration Research, Development, & Demonstration Distribution Grid Integration Transmission Grid Integration Solar Resource Assessment Technology Validation Power Electronics & Balance of System Hardware Technologies Competitive Awards

226

Bibliography on transmission access issues  

SciTech Connect (OSTI)

This paper presents a bibliography on issues related to transmission access in electric power systems. There are 233 citations referenced in this bibliography. This bibliography presents a collection of selected literature on issues related to transmission access. It does not contain all of the material available on this subject or the categories contained herein. Some readers may feel that citations within this bibliography should be strictly limited to transmission system issues and not include energy pricing or reliability issues. However, it was the decision of the Subcommittee of the IEEE Task Force on Transmission Access and Nonutility Generation that selected entries relating to reliability and energy pricing, most relevant to transmission access, should be included. This decision was made because certain issues relating to reliability, transmission and energy pricing are perceived by the industry to be critical in the discussion of transmission access. The bibliography has been divided into the following sections or sub-sections: 2.0 Operational (Engineering) Issues, 3.0 Planning, 4.0 Reliability, 5.1 Economics: Costing, 5.2(a) Economics: Location-Differentiated Pricing, 5.2(b) Economics: Time-Differentiated Pricing, 5.3 Economics: Brokering, Bidding, and Auctioning, 6.0 Regulatory, and 7.0 General. Although the content of many publications spanned two or more of these sections, the desire to limit document length required that all publications be placed in the single most appropriate section. Publications are sorted according to author or publication resource.

Lankford, C.B. [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States)] [Oklahoma Gas and Electric Co., Oklahoma City, OK (United States); McCalley, J.D. [Iowa State Univ., Ames, IA (United States)] [Iowa State Univ., Ames, IA (United States); Saini, N.K. [Entergy Services Corp., Metairie, LA (United States)] [Entergy Services Corp., Metairie, LA (United States)

1996-02-01T23:59:59.000Z

227

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

228

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

229

Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

230

Video transmission over wireless networks  

E-Print Network [OSTI]

Compressed video bitstream transmissions over wireless networks are addressed in this work. We first consider error control and power allocation for transmitting wireless video over CDMA networks in conjunction with multiuser detection. We map a...

Zhao, Shengjie

2005-08-29T23:59:59.000Z

231

National Electric Transmission Congestion Studies  

Broader source: Energy.gov [DOE]

Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act of 2005, directs the U.S. Department of Energy (DOE) to conduct a study every three years on electric transmission congestion and constraints within the Eastern and Western Interconnections. The American Reinvestment and Recovery Act of 2009 (Recovery Act) further directed the Secretary to include in the 2009 Congestion Study an analysis of significant potential sources of renewable energy that are constrained by lack of adequate transmission capacity. Based on this study, and comments concerning it from states and other stakeholders, the Secretary of Energy may designate any geographic area experiencing electric transmission capacity constraints or congestion as a national interest electric transmission corridor (National Corridor).

232

National Transmission Grid Study: 2002  

Broader source: Energy.gov [DOE]

National Transmission Grid Study: The National Energy Policy Plan directed the U.S. Department of Energy (DOE) to conduct a study to examine the benefits of establishing a national electricity...

233

OpenEI Community - transmission  

Open Energy Info (EERE)

black out brown out bulk power system electricity grid future grid grid history security Smart Grid transmission Smart Grid Fri, 31 Oct 2014 17:58:14 +0000 Dc 955 at...

234

Negative differential transmission in graphene  

Science Journals Connector (OSTI)

By using the Kubo linear response theory with the Keldysh Green function approach, we investigate the mechanism leading to the negative differential transmission in a system with the equilibrium electron density much smaller than the photon-excited one. It is shown that the negative differential transmission can appear at low probe-photon energy (in the order of the scattering rate) or at high energy (much larger than the scattering rate). For the low probe-photon energy case, the negative differential transmission is found to come from the increase of the intraband conductivity due to the large variation of electron distribution after the pumping. As for the high probe-photon energy case, the negative differential transmission is shown to tend to appear with the hot-electron temperature being closer to the equilibrium one and the chemical potential higher than the equilibrium one but considerably smaller than half of the probe-photon energy. We also show that this negative differential transmission can come from both the inter- and the intraband components of the conductivity. Especially, for the interband component, its contribution to the negative differential transmission is shown to come from both the Hartree-Fock self-energy and the scattering. Furthermore, the influence of the Coulomb-hole self-energy is also addressed.

B. Y. Sun and M. W. Wu

2013-12-17T23:59:59.000Z

235

DOE Transmission Capacity Report | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Transmission Capacity Report Transmission Capacity Report DOE Transmission Capacity Report DOE Transmission Capacity Report: Transmission lines, substations, circuit breakers, capacitors, and other equipment provide more than just a highway to deliver energy and power from generating units to distribution systems. Transmission systems both complement and substitute for generation. Transmission generally enhances reliability; lowers the cost of electricity delivered to consumers; limits the ability of generators to exercise market power; and provides flexibility to protect against uncertainties about future fuel prices, load growth, generator construction, and other factors affecting the electric system. DOE Transmission Capacity Report More Documents & Publications Report to Congress:Impacts of the Federal Energy Regulatory Commission's

236

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION | Department...  

Broader source: Energy.gov (indexed) [DOE]

AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION AGENDA: PETROLEUM PRODUCT TRANSMISSION & DISTRIBUTION A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

237

Briefing Memo: Petroleum Product Transmission & Distribution...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Briefing Memo: Petroleum Product Transmission & Distribution Briefing Memo: Petroleum Product Transmission & Distribution Click below to download a PDF of the briefing memo....

238

Natural Gas Transmission and Distribution Module  

Gasoline and Diesel Fuel Update (EIA)

U.S. Energy Information Administration | Assumptions to the Annual Energy Outlook 2013 Natural Gas Transmission and Distribution Module The NEMS Natural Gas Transmission and...

239

Agenda: Natural Gas: Transmission, Storage and Distribution ...  

Broader source: Energy.gov (indexed) [DOE]

Natural Gas: Transmission, Storage and Distribution Agenda: Natural Gas: Transmission, Storage and Distribution A Public Meeting on the Quadrennial Energy Review, Hosted by the...

240

2006 National Electric Transmission Congestion Study Federal...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

National Electric Transmission Congestion Study | Department...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Study National Electric Transmission Congestion Study National Electric Transmission Congestion Study Section 1221(a) of the Energy Policy Act of 2005, codified at 16 U.S.C....

242

2009 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

9 National Electric Transmission Congestion Study 2009 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

243

Electric Transmission Siting | Open Energy Information  

Open Energy Info (EERE)

navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Electric Transmission SitingLegal Abstract Electric Transmission Siting at the California...

244

2006 National Electric Transmission Congestion Study | Department...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study 2006 National Electric Transmission Congestion Study Section 216(a) of the Federal Power Act, as amended by the Energy Policy Act...

245

National Electric Transmission Congestion Study Workshops | Department...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Study Workshops National Electric Transmission Congestion Study Workshops DOE hosted four regional pre-study workshops to receive input...

246

WINDExchange Offshore Wind Webinar: Transmission Planning and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

247

Agenda: Electricity Transmission and Distribution - East | Department...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Transmission and Distribution - East Agenda: Electricity Transmission and Distribution - East A Public Meeting on the Quadrennial Energy Review, Hosted by the United...

248

Agenda: Electricity Transmission, Storage and Distribution -...  

Broader source: Energy.gov (indexed) [DOE]

Electricity Transmission, Storage and Distribution - West Agenda: Electricity Transmission, Storage and Distribution - West A Public Meeting on the Quadrennial Energy Review,...

249

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

250

Directly correlated transmission electron microscopy and atom...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Directly correlated transmission electron microscopy and atom probe tomography of grain boundary oxidation in a Ni-Al binary Directly correlated transmission electron microscopy...

251

Avent Ferry Rd. Centennial Parkway  

E-Print Network [OSTI]

--> CentennialParkway Achievement Dr. Main Campus Dr. Marcom St. GormanSt. Campus Shore Dr. Farmer's Market Oval PP PP UP PP UP UP UP UP UP UP UP PP UP Capability Dr. Twin Branches Way G Revised 11/2004 Future -- Alliance Center III CCMS -- Centennial Campus Middle School COE -- College of Engineering CFL

Krim, Jacqueline

252

Microsoft Word - CX-Chenoweth-Goldendale-Disconnect_FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Stacie Hensley Project Manager - TEP-TPP-4 Proposed Action: Chenoweth-Goldendale No. 1 disconnect switch project PP&A Project No.: 2,351 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Klickitat County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to construct a new disconnect switch stand and associated line work on its Chenoweth-Goldendale No. 1, 115-kilovolt transmission line adjacent to the BPA Goldendale Substation. The disconnect switch consists of a metal platform on a lattice steel structure supported by four steel legs. Construction of the disconnect

253

DOE/EA-1636: Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Mitigation Action Plan (March 2009)  

Broader source: Energy.gov (indexed) [DOE]

Burnt Woods and Santiam-Toledo Pole Replacement Project Burnt Woods and Santiam-Toledo Pole Replacement Project DOE/EA-1636 Summary This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115- kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kV transmission line in Linn, Benton and Lincoln counties, Oregon. This MAP is for the Proposed Action and includes all of the integral elements and commitments made in the Environmental Assessment (EA) to mitigate any potential adverse environmental impacts. The purpose of this MAP is to explain how the mitigation measures will be

254

CX-006585: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-006585: Categorical Exclusion Determination Tualatin Hills Park and Recreation District Request for Use of Right-Of-Way for Westside Trail CX(s) Applied: B4.9 Date: 08/25/2011 Location(s): Beaverton, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a request submitted by Tualatin Hills Park and Recreation District (THPRD) to construct portions of their proposed regional trail on existing BPA transmission line right-of-way (ROW) in the City of Beaverton, Oregon. THPRD?s trail sections would be located on portions of existing BPA fee-owned right-of-way property along the BPA Keeler-Oregon City No. 2 and Oregon City Stub 115-kilovolt transmission line corridors, as well as adjacent non-BPA

255

DOE/EA-1636: Finding of No Significant Impact for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project EA (March 2009)  

Broader source: Energy.gov (indexed) [DOE]

Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE/EA-1636 Summary The Bonneville Power Administration (BPA) announces its environmental findings on the Albany- Burnt Woods and Santiam-Toledo Pole Replacement Project. This project involves replacing wood pole structures on the existing Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and along a portion of the existing Santiam-Toledo single circuit, 230-kV transmission line. BPA has prepared an environmental assessment (DOE/EA-1636) evaluating the proposed project and its alternative. Based on the analysis in the EA, BPA has determined that the Proposed Action is not a major federal action significantly affecting the quality of the human environment, within the

256

CX-001182: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

82: Categorical Exclusion Determination 82: Categorical Exclusion Determination CX-001182: Categorical Exclusion Determination Access Road Improvement Project for Structure 12/1 of the Snoking Tap to Echo Lake-Monroe Number 1 Transmission Line CX(s) Applied: B1.13 Date: 03/12/2010 Location(s): Snohomish, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to construct a permanent access road to improve vehicle access to the 115 kilovolt Snoking Tap to Echo Lake-Monroe Number 1 Transmission Line. The project would involve constructing an approximately 760-foot long by 14-foot wide access road to structure 12/1. The project would also involve the installation of three culverts to help preserve the site's existing hydrology and increase the longevity of the proposed access road. Project activities would occur in

257

CX-009227: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

27: Categorical Exclusion Determination 27: Categorical Exclusion Determination CX-009227: Categorical Exclusion Determination Beaver Creek- Big Sandy 115 Kilovolt Transmission Line Structure Replacements - Last Chance Fire CX(s) Applied: B4.13 Date: 08/31/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) replaced approximately 55 structures on an existing l 0 mile section of the 115-k V transmission line between Beaver Creek and Big Sandy Substations in Washington County, Colorado. The Last Chance fire which began on June 25, 2012, destroyed the existing structures beyond repair. Western crews responded to this emergency and rebuilt the downed power lines to restore electrical service. The maintenance crews used existing access roads and no grading or

258

CX-005845: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5845: Categorical Exclusion Determination 5845: Categorical Exclusion Determination CX-005845: Categorical Exclusion Determination Selected Wood Pole Replacement and Minor Access Road Maintenance Along the Grand Coulee-Creston Transmission Line at Miles 14, 15, 21 and 28 CX(s) Applied: B1.3 Date: 05/05/2011 Location(s): Lincoln County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the Grand Coulee-Creston #1 115-kilovolt transmission line. The structures scheduled for replacement are identified as 14/6, 14/8, 15/1, 21/9 and 28/7. Replacement will be in-kind and will utilize the existing holes to minimize ground disturbance.

259

Microsoft Word - L0295-StJohnsTap-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

0 0 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joyce Vaughn Project Engineering - TELP-TPP-3 Proposed Action: L0295 - St. Johns-St. Helens #1 Interconnection Project Budget Information: Work Order #004866, Task 04 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6: "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area..." Location: Columbia County, Oregon (T4N, R1W, Section 7) Proposed by: Bonneville Power Administration (BPA) and Columbia River PUD (CRPUD) Description of the Proposed Action: BPA proposes to install a new tap and associated disconnect structures on BPA's St. Johns-St. Helens #1 115-kilovolt (kV) transmission line to

260

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

21 - 27930 of 28,904 results. 21 - 27930 of 28,904 results. Download CX-008782: Categorical Exclusion Determination Danger Tree Management on North Gunnison to Skito 115 Kilovolt Transmission Line Gunnison County, Colorado CX(s) Applied: B1.3 Date: 07/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008782-categorical-exclusion-determination Download CX-009234: Categorical Exclusion Determination Hesperus- Montrose 345 Kilovolt Transmission Line Private Lands Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/13/2012 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-009234-categorical-exclusion-determination

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

CX-005580: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

580: Categorical Exclusion Determination 580: Categorical Exclusion Determination CX-005580: Categorical Exclusion Determination Sidney to Sterling Transmission Line Structure Replacement, Logan County, Colorado CX(s) Applied: B4.6 Date: 12/22/2010 Location(s): Logan County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region Western proposes to replace approximately 22 existing wood pole H-frame structures along the Sidney to Sterling 115-kilovolt transmission line between the Sterling Substation and Peetz, Colorado. The existing structures would be replaced with structures that are approximately 10 feet taller to ensure proper electrical clearances. The new structures would look nearly identical to the replaced structures. The work includes removing existing structures and hardware, dismantling old structures,

262

Microsoft Word - CX-Cardwell-Cowlitz2011AccessRoad_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Rick Ross Project Manager - TELF-TPP-3 Proposed Action: Access road maintenance on or leading to the Cardwell-Cowlitz No.1, 115-kilovolt (kV) transmission line. Budget Information: Work Order #00281014 PP&A Project No.: 2020 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights-of-way, infrastructures (e.g.. roads)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area consists of Bonneville Power Administration (BPA) access roads located on or leading to the Cardwell-Cowlitz No. 1, 115-kV transmission line right-of-way.

263

CX-007515: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

15: Categorical Exclusion Determination 15: Categorical Exclusion Determination CX-007515: Categorical Exclusion Determination Bucknam Temporary Tap, Natrona County, Wyoming CX(s) Applied: B4.6 Date: 12/15/2011 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration is entering into an agreement with Tri-State Generation and Transmission to provide a temporary tap with mobile equipment to be placed until a facility study can be done for permanent construction. This Categorical Exclusion is for the installation of a temporary mobile transformer within Western's right of way (ROW) easement on Bureau of Land Management land along the Casper-Arminto 115 kilovolt transmission line 50 feet north of structure 23/8. The project will require a temporary tap, pad location, temporary fencing around the

264

Microsoft Word - CX-Sacajawea-SunHarborCascadeSteelTapPropertyTransferFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

20, 2012 20, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Realty Specialist - TERR-3 Proposed Action: Acquisition and Disposition of Property Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B1.24, Property transfers. Location: Walla Walla County, WA; Yamhill County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to dispose of one property and acquire another property in its service territory: Sacajawea-Sun Harbor: BPA proposes to dispose of 2.02 miles of its Sacajawea-Sun Harbor 115-kilovolt (kV) transmission line, associated easement rights, and its Sun Harbor Substation to the Columbia Rural Electric Association (CREA). The transmission line and substation are

265

Microsoft Word - CX-Cardwell-Cowlitz2011WoodPoles_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

1 1 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of all aging wood pole transmission line support structures along the Cardwell-Cowlitz No. 1, 115-kilovolt (kV) transmission line Budget Information: Work Order #00279267 PP&A Project No.: 2021 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities... for...rights of way, infrastructures (e.g.. structures)... routine maintenance activities, corrective...are required to maintain and preserve infrastructures...in a condition suitable for the facility to be used for its designated purpose. Location: The project area is located along Bonneville Power Administration's (BPA)

266

Microsoft Word - CX-Kalispell-KerrMile15-16AccessRoadImprovementFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

2 2 REPLY TO ATTN OF: KEPR-Bell-1 SUBJECT: Environmental Clearance Memorandum Joe Johnson Project Manager - TELF-TPP-3 Proposed Action: Access road improvement for the Kalispell-Kerr #1, 115-kilovolt (kV) transmission line PP&A Project No.: 2474 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine Maintenance, B1.13 Pathways, short access roads, and rail lines Location: Township 26 North, Range 21 West, Section 13 and 24, Flathead County, MT. Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to perform access road maintenance on several segments of the access road for the Kalispell-Kerr #1, 115-kV transmission line. Work includes reconstruction and drainage enhancements on 5000 feet of road beginning at structure

267

CX-008719: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

19: Categorical Exclusion Determination 19: Categorical Exclusion Determination CX-008719: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Naselle-Tarlett No. 1, Holcomb- Naselle No. 1, and Raymond-Willapa River No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. crossarms, insulators, and guy anchors) at existing H-frame structures along the subject transmission lines in Pacific County, Washington. Microsoft Word - CX-PacificCoWAWoodPolesFY12_WEB.doc More Documents & Publications CX-006794: Categorical Exclusion Determination EIS-0285-SA-118: Supplement Analysis

268

CX-006889: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-006889: Categorical Exclusion Determination Bristol to Groton Transmission Line Upgrade Project CX(s) Applied: B4.11 Date: 10/11/2011 Location(s): South Dakota Office(s): Western Area Power Administration-Upper Great Plains Region The Western Area Power Administration (WAPA) Bristol to Groton 115 kilovolt (kV) transmission line is to be upgraded in association with the Just Wind Napoleon Wind Farm. The Just Wind Napoleon Wind Farm will produce 367 megawatts (MW) when complete. Plans call for production of 100 MW at the end of 2010, with the remaining 267 MW coming online at a later date. The existing 115-kV conductor will need to be replaced with a new 795 MCM (thousands of circular mills) 115-kV conductor line before the full 367 MW

269

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

March 11, 2010 March 11, 2010 CX-007156: Categorical Exclusion Determination New Waddell-Raceway-Westwing Structure Replacement CX(s) Applied: B4.6, B4.13 Date: 03/11/2010 Location(s): Maricopa County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region February 18, 2010 CX-007167: Categorical Exclusion Determination Rogers-Coolidge Danger Tree Removal CX(s) Applied: B1.3 Date: 02/18/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region December 31, 2009 CX-001121: Categorical Exclusion Determination Transmission Line Structure Relocation of Existing Oracle-Tucson 115-kilovolt Transmission Line CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

270

CX-008709: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

09: Categorical Exclusion Determination 09: Categorical Exclusion Determination CX-008709: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. crossarms, insulators, and guy anchors) at existing H-frame structures along the subject transmission line in Mason and Jefferson counties, Washington. Microsoft Word - CX-Shelton-Fairmount-WoodPolesFY12_WEB.doc More Documents & Publications CX-008693: Categorical Exclusion Determination CX-008708: Categorical Exclusion Determination

271

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

22, 2011 22, 2011 CX-006583: Categorical Exclusion Determination Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration August 22, 2011 CX-006580: Categorical Exclusion Determination Wood Pole Replacement Along the Grand Coulee-Okanogan #2 115-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Grant County, Washington Office(s): Bonneville Power Administration August 18, 2011 EA-1728: Draft Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington August 15, 2011 EIS-0245-SA-03: Supplement Analysis Management of Spent Nuclear Fuel from the K Basins at the Hanford Site,

272

CX-007172: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

07172: Categorical Exclusion Determination 07172: Categorical Exclusion Determination CX-007172: Categorical Exclusion Determination Tucson-Apache Erosion Repair & Cactus Relocation CX(s) Applied: B1.3 Date: 02/23/2011 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to construct a new access road along the existing Tucson-Apache 115-kilovolt (kV) transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-25/2 & 25/3- 26/5. We will be installing two gates to limit right-of-way access from Houghton Road. We

273

CX-006794: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-006794: Categorical Exclusion Determination Naselle-Tarlett Nature Conservancy Access Road Funding CX(s) Applied: B1.13 Date: 09/12/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration In 2010, the Nature Conservancy (property owner), in accordance to agreements with Bonneville Power Administration (BPA), abandoned several sections of legal and usable access roads leading to BPA?s Nasselle-Tarlett 115-kilovolt transmission line corridor. The Nature Conservancy has constructed new, more environmentally friendly sections of access roads on their property to provide BPA alternate access the transmission line right-of-way and structures. BPA proposes to purchase easement rights and provide funding to partially cover construction costs of the new road

274

Microsoft Word - CX_Memo_Lex-Del  

Broader source: Energy.gov (indexed) [DOE]

0 2013 0 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Joan Kendall Project Manager - TERR-3 Proposed Action: Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Cowlitz County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to transfer ownership of a portion of its existing Lexington-Delameter 115-kV transmission line to Cowlitz County Public Utility District No.1 (Cowlitz PUD) in Cowlitz County, WA. BPA would sell the first four spans of the line, from BPA's Lexington Substation to approximately 2,000 feet northwest to structure 30/8,

275

CX-007991: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

991: Categorical Exclusion Determination 991: Categorical Exclusion Determination CX-007991: Categorical Exclusion Determination Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission lines. Microsoft Word - CX-Drummond-MacksInn_WoodPoleReplacementFY12_WEB.doc More Documents & Publications CX-009709: Categorical Exclusion Determination EIS-0267: Final Environmental Impact Statement EIS-0285-SA-82: Supplemental Analysis

276

EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

1: Notice of Intent to Prepare an Environmental Impact 1: Notice of Intent to Prepare an Environmental Impact Statement EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho BPA intends to prepare an EIS in accordance with the National Environmental Policy Act (NEPA) on the proposed construction, operation, and maintenance of a 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new BPA substation would be called Hooper Springs Substation and would be located adjacent to PacifiCorp's existiog 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. The new 115-kV single-circuit BP A transmission line would exlend generally north and east from these

277

CX-000603: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-000603: Categorical Exclusion Determination Baseload Energy Inc. Brasada-Harney 115-kilovolt Transmission Line Project CX(s) Applied: B4.6 Date: 02/04/2010 Location(s): Deschutes County, Oregon Office(s): Bonneville Power Administration The proposed project is a result of an interconnection request that was made by Baseload Energy, Inc., to interconnect onto the Federal Columbia River Transmission System. This interconnection request would accommodate a High Altitude Wind Generation Turbine that would generate up to 8 megawatts of harvested wind power. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000603.pdf More Documents & Publications CX-010589: Categorical Exclusion Determination CX-005844: Categorical Exclusion Determination

278

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

41 - 11850 of 26,764 results. 41 - 11850 of 26,764 results. Download CX-008386: Categorical Exclusion Determination Danger Tree Management on Bridgeport to Sydney 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/11/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008386-categorical-exclusion-determination Download CX-008396: Categorical Exclusion Determination Danger Tree Management on Shiprock-Four Corners 345 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/13/2012 Location(s): New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008396-categorical-exclusion-determination Article DOE Selects Projects to Advance Technologies for the Co-Production

279

EIS-0457: Record of Decision | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Record of Decision Record of Decision EIS-0457: Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR BPA decided to implement the Proposed Action Alternative from the Albany-Eugene 115-kilovolt (kV) No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement (EIS) (DOE/EIS-0457, March 2012). The Proposed Action Alternative, which was identified as the agency's preferred alternative in the Final EIS, consists of rebuilding a 32-mile section of the existing Albany-Eugene 115-kV transmission line that extends from the Albany Substation in the City of Albany in Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. EIS-0457-ROD-MAP-2012.pdf More Documents & Publications EIS-0457: Mitigation Action Plan EIS-0457: Final Environmental Impact Statement

280

CX-005418: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

18: Categorical Exclusion Determination 18: Categorical Exclusion Determination CX-005418: Categorical Exclusion Determination Birch Creek Radio Tower CX(s) Applied: B4.6 Date: 03/07/2011 Location(s): Bonneville County, Idaho Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to install a new 50-foot radio tower within the existing Birch Creek Radio Station property in order to communicate with Utah Associated Municipal Power System?s (UAMPS) new 100-megawatt Horse Butte Wind Power Generating Facility. BPA would also install telemetry and communication equipment within UAMPS?s Horse Butte control house. Electrical generation produced from the Horse Butte Wind project would interconnect into BPA?s transmission system via a tap between towers 31/6 and 31/7 of BPA?s Palisades-Goshen 115-kilovolt transmission

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

April 1, 2013 April 1, 2013 CX-010106: Categorical Exclusion Determination Flaming Gorge Microwave Site Communications Building Access Road Repairs CX(s) Applied: B1.3 Date: 04/01/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 26, 2013 CX-010105: Categorical Exclusion Determination Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region January 23, 2013 CX-009804: Categorical Exclusion Determination Kersey West Switching Station Interconnection Kiowa Creek - Welc 115 Kilovolt Transmission Line CX(s) Applied: B4.1, B4.11 Date: 01/23/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

282

CX-003237: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

237: Categorical Exclusion Determination 237: Categorical Exclusion Determination CX-003237: Categorical Exclusion Determination Chehalis-Raymond Number 1 2010 Line Rebuild CX(s) Applied: B4.6 Date: 07/19/2010 Location(s): Lewis County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to rebuild the first 19 miles of the Chehalis-Raymond Number 1, 115 kilovolt transmission line from Chehalis Substation to Pe Ell Substation. The subject transmission line has reached its designed service age and needs to be replaced to insure system reliability and the safe operation. The proposed project includes replacement of all wood pole support structures, electrical conductor, support guys, and associated hardware. Additionally, some minor road maintenance will be completed to gain access to structures where road

283

CX-003789: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

789: Categorical Exclusion Determination 789: Categorical Exclusion Determination CX-003789: Categorical Exclusion Determination Grandview-Red Mountain Number 1 Proposed Transmission Line Interconnection CX(s) Applied: B4.6 Date: 09/08/2010 Location(s): Benton County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to construct a 115-kilovolt (kV) tap point consisting of two 115-kV sectionalizing switches with loop breaking capability on the Grandview-Red Mountain Number 1 transmission line between structures 18/1 and 18/2 in order to accommodate an interconnection request by Benton Rural Electric Association (REA) for their Acord Substation development project. BPA would be responsible for revenue metering at the new Acord Substation, and for the tap, which would

284

CX-002774: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

74: Categorical Exclusion Determination 74: Categorical Exclusion Determination CX-002774: Categorical Exclusion Determination Vera Tap to Trentwood Valley Way #1 Project CX(s) Applied: B4.6, B4.13 Date: 06/03/2010 Location(s): Trentwood, Washington Office(s): Bonneville Power Administration Bonneville Power Administration proposes to add a disconnect switch and 2 wood poles between two existing pole structures on its Vera Tap to Trentwood Valley Way Number 1, 115-kilovolt transmission line in eastern Washington. The project will improve system reliability for its customer, Vera Water and Power, by allowing better sectionalizing of the transmission line for maintenance. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-002774.pdf More Documents & Publications CX-005009: Categorical Exclusion Determination

285

CX-007142: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

07142: Categorical Exclusion Determination 07142: Categorical Exclusion Determination CX-007142: Categorical Exclusion Determination Electrical District 5 - Saguaro Structure Maintenance CX(s) Applied: B1.3 Date: 02/09/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kilovolt Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures because the wood poles failed stability tests, cross arms are beyond repair and arms and braces need to be changed to a more modern

286

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

11 - 30220 of 31,917 results. 11 - 30220 of 31,917 results. Download CX-007991: Categorical Exclusion Determination Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007991-categorical-exclusion-determination Download CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007999-categorical-exclusion-determination Download CX-008151: Categorical Exclusion Determination

287

Career Map: Power Systems/Transmission Engineer  

Broader source: Energy.gov [DOE]

The Wind Program's Career Map provides job description information for Power Systems and Transmission Engineer positions.

288

DOE Transmission System Integration Workshop  

Broader source: Energy.gov (indexed) [DOE]

Heyeck, AEP, Sr. Vice President, Transmission Heyeck, AEP, Sr. Vice President, Transmission and Chair, EPRI Power Delivery & Utilization Sector Council November 01-02, 2012 DoubleTree Hotel, Crystal City Washington D.C. DOE Transmission System Integration Workshop 2 © 2012 Electric Power Research Institute, Inc. All rights reserved. Near-Zero Emissions Long-Term Operations Renewable Integration Water Management Electric Vehicles Demand Response & Efficiency Renewable Energy Energy Storage Sensors & Control Cyber Security Supply = Demand The Power System Supply to Demand Requires a full portfolio of innovative technologies. Tomorrow's Power System One size does not fit all 3 © 2012 Electric Power Research Institute, Inc. All rights reserved. Grid Transformation to Ensure Reliability, Efficiency, Resiliency and Security

289

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

290

California/Transmission | Open Energy Information  

Open Energy Info (EERE)

California/Transmission California/Transmission < California Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in California is part of the WestConnect Transmission Planning area and the California Transmission Planning Group. The desert southwest region of California belongs to the Southwest Area Transmission power grid and the northern region of the state belongs to the Sierra Subregional Planning Group. The SWAT provides the technical forum required to complete reliability assessments, develop joint business opportunities and accomplish

291

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

transmission right, electricity auction, simultaneous feasibility, transmission pricing. I. INTRODUCTION POINT

292

The Inherent Inefficiency of Simultaneously Feasible Financial Transmission Rights Auctions  

E-Print Network [OSTI]

, transmission pricing. I. INTRODUCTION POINT-TO-POINT financial transmission rights (FTRs) (see [2] and [7

293

Power superconducting power transmission cable  

DOE Patents [OSTI]

The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

Ashworth, Stephen P. (Cambridge, GB)

2003-01-01T23:59:59.000Z

294

Power Transmission, Distribution and Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Transmission, Distribution and Plants A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Abdel-Aal, Radwan E. - Computer Engineering Department, King Fahd University of...

295

Definition: Network Integration Transmission Service | Open Energy  

Open Energy Info (EERE)

Network Integration Transmission Service Network Integration Transmission Service Jump to: navigation, search Dictionary.png Network Integration Transmission Service Service that allows an electric transmission customer to integrate, plan, economically dispatch and regulate its network reserves in a manner comparable to that in which the Transmission Owner serves Native Load customers.[1] Related Terms transmission lines, transmission customer, transmission line, native load, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Network_Integration_Transmission_Service&oldid=502560" Categories: Definitions

296

Microsoft Word - CX-GrandRonde-Boyer-ImpairmentEmergency-FY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

3 3 REPLY TO ATTN OF: KEP-Alvey SUBJECT: Environmental Clearance Memorandum Jim Semrau Civil Engineer - TEP-TPP-1 Proposed Action: Wood pole replacement PP&A Project No.: 2760 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Structures 4/5 and 4/6 of Bonneville Power Administration's (BPA) 115-kilovolt Grand Ronde-Boyer No. 1 transmission line located in Polk County, Oregon (Willamette Meridian, T6S, R8W, section 8, se ¼ of se ¼). Proposed by: BPA Description of the Proposed Action: BPA proposes to fix two ground impairments between structures 4/5 and 4/6 on the Grand Ronde-Boyer No. 1 line. The impairments are required to be fixed within 30 days of detection due to concerns for public safety. The conductor on a typical

297

CX-006815: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-006815: Categorical Exclusion Determination Cattle Creek Substation CX(s) Applied: B4.11 Date: 09/27/2011 Location(s): Bonneville County, Idaho Office(s): Bonneville Power Administration In response to Utah Associated Municipal Power System?s (UAMPS) interconnection request, Bonneville Power Administration (BPA) is planning to integrate UAMPS?s 100-megawatt (MW) Horse Butte Wind Power Generating Facility into its balancing authority. The proposed point of interconnection is at the Palisades-Goshen 115-kilovolt transmission line adjacent to tower 31/6. Document(s) Available for Download CX-006815.pdf More Documents & Publications CX-008877: Categorical Exclusion Determination CX-010590: Categorical Exclusion Determination

298

CX-004889: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-004889: Categorical Exclusion Determination Casa Grande-Empire (Geological Boring) CX(s) Applied: B3.1 Date: 08/19/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to do geologic boring within our right-of-way at structures 18/2, 21/2, 25/1, 37/5, and 41/5 along the existing Casa Grande-Empire 115 kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004889.pdf More Documents & Publications CX-007130: Categorical Exclusion Determination

299

EIS-0470: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Final Environmental Impact Statement 0: Final Environmental Impact Statement EIS-0470: Final Environmental Impact Statement Cape Wind Energy Project, Nantucket Sound, MA The DOE Loan Program Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. In December 2012, DOE adopted the Department of the Interior 2009 Final Cape Wind Energy Project EIS, in combination with the Cape Wind Environmental Assessments dated May 2010 and April 2011 (per 40 CFR

300

CX-004456: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

456: Categorical Exclusion Determination 456: Categorical Exclusion Determination CX-004456: Categorical Exclusion Determination Boysen-Copper Mountain Structure 98/1 Replacement Project, Fremont County, Wyoming CX(s) Applied: B1.3, B4.6 Date: 11/10/2010 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western proposes to replace Structure 98/1 and conduct access road maintenance on Western's existing Boysen-Copper Mountain 115 kilovolt transmission line in Fremont County, Wyoming. Structure 98/1 is located on United States (US) Bureau of Reclamation land in the southeast 1/4 of Section 16, T. 5 north, R. 6 east, of the Wind River meridian, Wyoming near the Boysen State Park Headquarters. A cleared, level area (landing) will be constructed around the base of structure 98/1 for better equipment

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

302

CX-007170: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

70: Categorical Exclusion Determination 70: Categorical Exclusion Determination CX-007170: Categorical Exclusion Determination Saguaro-Tucson Vegetation Removal CX(s) Applied: B1.3 Date: 03/30/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to remove vegetation under its existing Saguaro-Tucson 115-kilovolt transmission line, within Western's existing right-of-way between Structures 5/3 and 6/3 in Pinal County, Arizona. We plan on using existing access roads to the vegetation removal areas. Western will be using a front-end loader with a cutting & shredding attachment to remove the vegetation. This work is necessary to maintain the safety and reliability of the bulk electrical system. CX-007170.pdf More Documents & Publications

303

Microsoft Word - City_of_Sherwood_LURR_CX.docx  

Broader source: Energy.gov (indexed) [DOE]

5, 2013 5, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: City of Sherwood Sewer Line Replacement Land Use Review Request Budget Information: 184006 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B 4.9 Multiple use of powerline rights-of-way Location: Sherwood, Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to approve a land use review request (LURR) submitted by the city of Sherwood (city) to replace a portion of its proposed sewer line within existing BPA fee-owned right-of-way (ROW) between structure 19/11 of BPA's Keeler-Oregon City No. 2 115-kilovolt (kV) transmission line and SW Tualatin-Sherwood Road. The city would replace

304

Categorical Exclusion Determinations: Colorado | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 5, 2012 September 5, 2012 CX-009189: Categorical Exclusion Determination (0675-1594) Eaton Corporation - Predictive Battery Management for Commercial Hybrid Vehicles CX(s) Applied: B3.6 Date: 09/05/2012 Location(s): Michigan, Minnesota, Colorado Offices(s): Advanced Research Projects Agency-Energy August 31, 2012 CX-009227: Categorical Exclusion Determination Beaver Creek- Big Sandy 115 Kilovolt Transmission Line Structure Replacements - Last Chance Fire CX(s) Applied: B4.13 Date: 08/31/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region August 29, 2012 CX-008913: Categorical Exclusion Determination High Resolution 3D Laser Imaging for Inspection, Maintenance, Repair and Operations - Phase II CX(s) Applied: A9, B3.6 Date: 08/29/2012

305

CX-007169: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

169: Categorical Exclusion Determination 169: Categorical Exclusion Determination CX-007169: Categorical Exclusion Determination Saguaro-Oracle Vegetation Removal CX(s) Applied: B1.3 Date: 04/07/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct vegetation removal between structures 0/3 and 0/4, 1/5 and 1/6, 3/1 and 3/2, 4/2 and 4/3, around structure 4/8, between structures 5/1 and 5/2 and around structure 5/4 of its Saguaro-Oracle 115- kilovolt transmission line, within Western's existing right-of-way. Western will access the vegetation removal areas using crew trucks along the existing access roads. Western will use a front end loader with a cut shredder attachment to knock down and chip wood vegetation. The debris will

306

EIS-0451: Hooper Springs Project, Caribou County, Idaho | Department of  

Broader source: Energy.gov (indexed) [DOE]

1: Hooper Springs Project, Caribou County, Idaho 1: Hooper Springs Project, Caribou County, Idaho EIS-0451: Hooper Springs Project, Caribou County, Idaho Summary This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. Public Comment Opportunities None available at this time. Documents Available for Download March 11, 2013 EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho March 8, 2013

307

Microsoft Word - CX-Rogue-GoldBeach-DisconnectSwitch-FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2013 8, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Gregory L Vassallo Electical Engineer - TPCV-ALVEY Proposed Action: Rogue-Gold Beach No. 2 disconnect switch replacement Pollution Prevention and Abatement Project No.: 2411 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Curry County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA and Coos-Curry Electric Cooperative, Inc. (Coos- Curry) have developed a joint plan to replace the existing B-1734 115-kilovolt, group-operated disconnect switch located at BPA's Gold Beach Substation with a new horizontally-mounted,

308

EIS-0457: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement EIS-0457: Final Environmental Impact Statement Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the potential environmental impacts of a Bonneville Power Administration (BPA) proposal to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line. This line extends from the Albany Substation in the City of Albany, Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. BPA issued the Draft EIS in January 2012 for public review. BPA considered all comments received to prepare this Comment-Response Addendum (download below) which, together with the Draft EIS, consitutes the Final EIS [40 CFR 1503.4(c)]. The Comment-Response Addendum includes a chapter

309

CX-007135: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7135: Categorical Exclusion Determination 7135: Categorical Exclusion Determination CX-007135: Categorical Exclusion Determination Coolidge-Oracle Crossarm Replacement CX(s) Applied: B1.3 Date: 07/29/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct Emergency Crossarm Replacement at Structures 3/3 and 38/8 along the existing Coolidge-Oracle 115-kilovolt transmission line. We will use existing access roads and rubber tired vehicles such as pickup trucks, crew trucks, and bucket trucks to bring personnel and equipment to the work area. This work is necessary to maintain the safety and reliability of the bulk electrical system. CX-007135.pdf More Documents & Publications CX-004891: Categorical Exclusion Determination

310

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

91 - 22200 of 29,416 results. 91 - 22200 of 29,416 results. Page EIS-0470: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy Project on the Outer Continental Shelf off Massachusetts, Nantucket Sound The DOE Loan Programs Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. To inform DOE's decision regarding a loan guarantee, DOE adopted the Department of the Interior's 2009 Final Cape Wind Energy Project EIS,

311

Microsoft Word - CX_Memo_TVWD.docx  

Broader source: Energy.gov (indexed) [DOE]

31, 2012 31, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Julie Goodrich Project Manager - TERR-3 Proposed Action: Tualatin Valley Water District Waterline Land Use Review Request Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple use of powerline rights-of-way Location: Washington County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-Oregon City No.2 115-kilovolt (kV) transmission line corridor in the City of Beaverton,

312

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31 - 4240 of 26,777 results. 31 - 4240 of 26,777 results. Download Congestion Analysis of the Eastern Interconnection: Simulation Results Congestion Analysis of the Eastern Interconnection: Simulation Results http://energy.gov/oe/downloads/congestion-analysis-eastern-interconnection-simulation-results Download CX-008677: Categorical Exclusion Determination Columbia and Willamette River Crossings Liquefaction Hazard Assessment CX(s) Applied: B3.1 Date: 07/23/2012 Location(s): Oregon, Oregon, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008677-categorical-exclusion-determination Download CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line CX(s) Applied: B1.3

313

EA-1467: Finding of No Significant Impact | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1467: Finding of No Significant Impact EA-1467: Finding of No Significant Impact EA-1467: Finding of No Significant Impact Bonneville-Alcoa Access Road Project Bonneville Power Administration (BPA) proposes to establish a half mile of access road to tower 9/1 along the Bonneville-Alcoa No. 1 115-kilovolt (kV) transmission line. The road is needed to replace maintenance and emergency access to tower 9/1 because the road previously used to access the tower is blocked by a landslide that occurred in 1996. Approximately 1/8 mile of the proposed road exists, although it is overgrown and needs brush clearing. The remaining 3/8 mile of road would be constructed. Bonneville-Alcoa Access Road Project More Documents & Publications EA-1366: Preliminary Environmental Assessment EA-1366: Finding of No Significant Impact

314

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51 - 23660 of 31,917 results. 51 - 23660 of 31,917 results. Download CX-006242: Categorical Exclusion Determination North Gunnison-Salida 115-Kilovolt Transmission Line Jumper Cable Replacements, Gunnison County, Colorado CX(s) Applied: B4.6 Date: 06/14/2011 Location(s): Gunnsion, CO Office(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-006242-categorical-exclusion-determination Download CX-006244: Categorical Exclusion Determination Craig-Bears Ears-Hayden Substations Fiber Optic and Pole Installation, Moffat and Routt Counties, Colorado CX(s) Applied: B4.6, B4.7 Date: 05/17/2011 Location(s): Moffat, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-006244-categorical-exclusion-determination

315

EA-1855: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Assessment Final Environmental Assessment EA-1855: Final Environmental Assessment Creston-Bell Rebuild Project, Lincoln and Spokane Counties, Washington (aka DOE/EA-4406) This EA evaluates the potential environmental impacts of a proposal to rebuild the Creston-Bell 115-kilovolt transmission line. The 54-mile long, wood pole line extends from the BPA Creston substation to the BPA Bell substation in Lincoln and Spokane Counties, Washington. The EA Revision Sheet combined with the Preliminary EA constitutes the final EA. The final EA includes a Floodplain Statement of Findings and a Mitigation Action Plan that outlines the mitigation measures that will be implemented during and after construction. Construction begins in mid May, 2012 and will be completed in the winter of 2012.

316

CX-007136: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Categorical Exclusion Determination 6: Categorical Exclusion Determination CX-007136: Categorical Exclusion Determination Coolidge-Oracle Pole Replacement CX(s) Applied: B4.6 Date: 11/13/2009 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western plans to replace deteriorated wood poles, cross arms and X-braces at 59 existing H-frame or three-pole-turning structures located along the Coolidge-Oracle 115-kilovolt Transmission Line in Pinal County, Arizona. Built in 1943, its aging components are beyond repair and require replacement. These poles performed poorly during structural tests, and we consider them unstable, This project ensures the safety of Western's workers and the public as well as reliability of the bulk electric system.

317

Categorical Exclusion Determinations: Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 22, 2012 June 22, 2012 CX-008692: Categorical Exclusion Determination Amendment Number 2 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 06/22/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration June 21, 2012 CX-008695: Categorical Exclusion Determination Munro Control Center Expansion CX(s) Applied: B1.15 Date: 06/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 20, 2012 CX-008694: Categorical Exclusion Determination Acquisition and Disposition of Property CX(s) Applied: B1.24 Date: 06/20/2012 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration June 20, 2012 CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line

318

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

41 - 16450 of 26,764 results. 41 - 16450 of 26,764 results. Page EA-1931: Keeler-Forest Grove, Forest Grove-Tillamook Line No. 1 Line Rebuild Project, Washington and Tillamook Counties, Oregon Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available. http://energy.gov/nepa/ea-1931-keeler-forest-grove-forest-grove-tillamook-line-no-1-line-rebuild-project-washington

319

CX-006814: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6814: Categorical Exclusion Determination 6814: Categorical Exclusion Determination CX-006814: Categorical Exclusion Determination Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line Project CX(s) Applied: B4.12 Date: 10/07/2011 Location(s): Dayton, Columbia County, Washington Office(s): Bonneville Power Administration The Columbia Rural Electric Association (REA) has requested to provide power to Columbia REA?s Dayton Substation via interconnection to an existing Bonneville Power Administration (BPA) transmission line in Columbia County, Washington. Columbia REA will construct, own, operate, and maintain the proposed tap line from their Dayton Substation to the point of interconnection, but entered into an agreement with BPA to provide financial assistance to construct the approximately 7.5-mile, 115- kilovolt

320

Categorical Exclusion Determinations: Arizona | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

November 23, 2009 November 23, 2009 CX-000202: Categorical Exclusion Determination Energy Efficiency and Renewable Energy in Schools CX(s) Applied: B5.1 Date: 11/23/2009 Location(s): Arizona Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 13, 2009 CX-007136: Categorical Exclusion Determination Coolidge-Oracle Pole Replacement CX(s) Applied: B4.6 Date: 11/13/2009 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region November 13, 2009 CX-001118: Categorical Exclusion Determination Emergency Wood Pole Replacement at 59 Structures Located Along the Coolidge-Oracle 115-Kilovolt Transmission Line CX(s) Applied: B4.6 Date: 11/13/2009 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81 - 15090 of 28,560 results. 81 - 15090 of 28,560 results. Download CX-000603: Categorical Exclusion Determination Baseload Energy Inc. Brasada-Harney 115-kilovolt Transmission Line Project CX(s) Applied: B4.6 Date: 02/04/2010 Location(s): Deschutes County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-000603-categorical-exclusion-determination Download CX-002368: Categorical Exclusion Determination Puget Sound Tidal Energy Demonstration Project: Environmental and Permitting Activities CX(s) Applied: B3.1, B3.3, A9 Date: 05/10/2010 Location(s): Puget Sound, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-002368-categorical-exclusion-determination Download CX-003333: Categorical Exclusion Determination

322

Categorical Exclusion Determinations: B4.13 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3 3 Categorical Exclusion Determinations: B4.13 Existing Regulations B4.13: Upgrading and rebuilding existing powerlines Upgrading or rebuilding approximately 20 miles in length or less of existing electric powerlines, which may involve minor relocations of small segments of the powerlines. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD August 8, 2013 CX-010887: Categorical Exclusion Determination Archer-Sidney 115-Kilovolt Transmission Line Structure Replacement CX(s) Applied: B4.13 Date: 08/08/2013 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

323

Microsoft Word - CX-Keeler-OregonCity_Access_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Shelley Fenton Shelley Fenton Realty Specialist - TERR-3 Proposed Action: Bonneville Power Administration (BPA) proposes to grant the Murray Hill Recreation Association permission to cross the BPA right-of-way on the Keeler-Oregon City No. 2, 115-kilovolt (kV) corridor between Tower 14/4 and Tower 14/6+250. PP&A Project No.: PP&A 2023 Budget Information: N/A Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Grant or denial of requests for multiple use of a transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and drainage culverts. Location: Section 32; Township 1 South; Range 1 West; Willamette Meridian; Washington County, Oregon Proposed by: BPA

324

Categorical Exclusion Determinations: Western Area Power  

Broader source: Energy.gov (indexed) [DOE]

December 16, 2009 December 16, 2009 CX-000556: Categorical Exclusion Determination Willoby Substation Construction Project-Weld County, Colorado CX(s) Applied: B4.11 Date: 12/16/2009 Location(s): Weld County, Colorado Office(s): Western Area Power Administration-Rocky Mountain Region December 2, 2009 CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region November 16, 2009 CX-000554: Categorical Exclusion Determination Ogallala Substation KY1A Transformer Replacement CX(s) Applied: B4.6 Date: 11/16/2009 Location(s): Ogallala, Nebraska Office(s): Western Area Power Administration-Rocky Mountain Region

325

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

11 - 12520 of 28,905 results. 11 - 12520 of 28,905 results. Download EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado http://energy.gov/nepa/downloads/eis-0159-record-decision Download STGWG Meeting- October 2009 State and Tribal Government Working Group MeetingOctober 21, 2009Hotel MonteleoneNew Orleans, Louisiana http://energy.gov/em/downloads/stgwg-meeting-october-2009 Download Letter: Direction and Guidance for Implementing Direct DOE Relationship & Funding for EMSSABs From: Assistant Secretary, Jessie Hill Roberson (EM-11) To: Mr. Monte Wilson, Chair, INEEL Citizens Advisory Board http://energy.gov/em/downloads/letter-direction-and-guidance-implementing-direct-doe-relationship Download Docket No. EERE-2008-BT-STD-0005. RIN 1904-AB57

326

EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR |  

Broader source: Energy.gov (indexed) [DOE]

57: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR 57: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR Summary This EIS evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, Oregon. Public Comment Opportunities None available at this time. Documents Available for Download June 13, 2012 EIS-0457: Mitigation Action Plan Albany-Eugene Rebuild Project, Lane and Linn Counties, OR June 13, 2012 EIS-0457: Notice of Availability of a Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR June 13, 2012 EIS-0457: Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR

327

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61 - 7870 of 26,764 results. 61 - 7870 of 26,764 results. Download CX-005726: Categorical Exclusion Determination Coastal Ohio Wind Project for Reduced Barriers to Deployment of Offshore Wind Energy CX(s) Applied: A9, B3.1, B3.6 Date: 04/11/2011 Location(s): Bowling Green, Ohio Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-005726-categorical-exclusion-determination Download CX-006816: Categorical Exclusion Determination Line and Load Interconnection of Coos-Curry Electric Cooperative?s New Substation to Bonneville Power Administration?s Fairview-Bandon 115-Kilovolt Transmission Line CX(s) Applied: B4.6, B4.10 Date: 09/26/2011 Location(s): Coos County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-006816-categorical-exclusion-determination

328

Categorical Exclusion Determinations: B4.6 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 20, 2012 June 20, 2012 CX-008773: Categorical Exclusion Determination Airport to Boyd 115 Kilovolt Transmission Line Structure Replacements Larimer County, Colorado CX(s) Applied: B1.3, B4.6 Date: 06/20/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region June 18, 2012 CX-008769: Categorical Exclusion Determination Platform Construction for Power Pole Work CX(s) Applied: B1.13, B2.5, B4.6 Date: 06/18/2012 Location(s): Wyoming Offices(s): RMOTC June 18, 2012 CX-008769: Categorical Exclusion Determination Platform Construction for Power Pole Work CX(s) Applied: B1.13, B2.5, B4.6 Date: 06/18/2012 Location(s): Wyoming Offices(s): RMOTC June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project

329

EIS-0457: EPA Notice of Availability of a Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Impact Statement EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, Oregon. Comment Period Ends: 03/05/12 Submit Comments to: Douglas Corkran Environmental Specialist Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, OR 97208-3621 Toll-free telephone: 800-282-3713 Direct telephone: 503-230-7646 Fax: 503-230-5699 Electronic mail: dfcorkran@bpa.gov EIS-0457-EPANOADEIS-2012.pdf More Documents & Publications EIS-0413: EPA Notice of Availability of a Draft Environmental Impact

330

Microsoft Word - FONSI final.doc  

Broader source: Energy.gov (indexed) [DOE]

Bonneville-Alcoa Access Road Project Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) proposes to establish a half mile of access road to tower 9/1 along the Bonneville-Alcoa No. 1 115-kilovolt (kV) transmission line. The road is needed to replace maintenance and emergency access to tower 9/1 because the road previously used to access the tower is blocked by a landslide that occurred in 1996. Approximately 1/8 mile of the proposed road exists, although it is overgrown and needs brush clearing. The remaining 3/8 mile of road would be constructed. BPA has prepared an Environmental Assessment (DOE/EA-1467) to determine if the Proposed Action would cause significant effects that would warrant preparing an Environmental Impact

331

Microsoft Word - CX-Franklin-BadgerCanyonGrandview-RedMtnsDisconnectSwitch_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2012 8, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: Franklin-Badger Canyon and Grandview-Red Mountain switch replacements PP&A Project No.: 2,349 / 2,350 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace disconnect switches and related equipment on the Franklin-Badger Canyon No.2 and Grandview-Red Mountain No.1 115- kilovolt transmission lines. The switch stands will be replaced in the same locations as the existing structures, and related load break equipment will be upgraded in-kind to existing. Both

332

EIS-0470: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy  

Broader source: Energy.gov (indexed) [DOE]

0: U.S. Department of Energy Loan Guarantee for the Cape 0: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy Project on the Outer Continental Shelf off Massachusetts, Nantucket Sound EIS-0470: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy Project on the Outer Continental Shelf off Massachusetts, Nantucket Sound Summary The DOE Loan Programs Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. To inform DOE's decision regarding a loan guarantee, DOE adopted

333

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

15, 2011 15, 2011 CX-006137: Categorical Exclusion Determination B39 Cellular Repeater Installation CX(s) Applied: B1.7 Date: 06/15/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory June 15, 2011 CX-006136: Categorical Exclusion Determination Field Testing of Low Impact Oil Field Roads CX(s) Applied: B3.7 Date: 06/15/2011 Location(s): Webb County, Texas Office(s): Fossil Energy, National Energy Technology Laboratory June 15, 2011 CX-006079: Categorical Exclusion Determination Topic 7A, Emergency Backup Power Systems CX(s) Applied: A9, B5.1 Date: 06/15/2011 Location(s): Georgia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office June 14, 2011 CX-006242: Categorical Exclusion Determination North Gunnison-Salida 115-Kilovolt Transmission Line Jumper Cable

334

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51 - 18060 of 28,905 results. 51 - 18060 of 28,905 results. Download CX-007819: Categorical Exclusion Determination Yellowtail Dam Tie Lines CX(s) Applied: B2.5, B4.6 Date: 01/25/2012 Location(s): Montana Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-007819-categorical-exclusion-determination Download CX-008377: Categorical Exclusion Determination Alcova-Casper North 115 Kilovolt Transmission Line Pole Replacements CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-008377-categorical-exclusion-determination Download CX-008383: Categorical Exclusion Determination Cheyenne Substation West Control Building Roof Replacement CX(s) Applied: B1.3

335

CX-007158: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

58: Categorical Exclusion Determination 58: Categorical Exclusion Determination CX-007158: Categorical Exclusion Determination Oracle-Tucson Pole Replacement CX(s) Applied: B4.6 Date: 04/16/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western plans to replace deteriorated wood poles, cross arms and X-braces at two existing H-frame structures located along the Oracle Tucson 115-kilovolt Transmission Line in Pima, Arizona. Built in 1943, its aging components are beyond repair and require replacement. These poles performed poorly during structural tests, and we consider them unstable. This replacement project will ensure the safety of Western's workers and the public as well as reliability of the bulk electric system. CX-007158.pdf More Documents & Publications

336

Categorical Exclusion Determinations: Arizona | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 8, 2010 July 8, 2010 CX-003196: Categorical Exclusion Determination Emergency Crossarm Replacement at Structure 39/7 and Access Road Maintenance along the Existing Tucson-Apache 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B1.3 Date: 07/08/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region July 6, 2010 CX-003004: Categorical Exclusion Determination Arizona-Tribal Energy Program-Hualapai Tribe CX(s) Applied: A9, B3.1 Date: 07/06/2010 Location(s): Hualapai Tribe, Arizona Office(s): Energy Efficiency and Renewable Energy July 2, 2010 CX-002842: Categorical Exclusion Determination Overcoming Critical Barriers to United States Wind Power; A University-Industry Consortium CX(s) Applied: A9 Date: 07/02/2010

337

CX-005130: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-005130: Categorical Exclusion Determination Ringold Substation Structure Replacement Project CX(s) Applied: B4.6 Date: 01/21/2011 Location(s): Basin City, Washington Office(s): Bonneville Power Administration Bonneville Power Administration is proposing to replace the single pole structure 8/9 of the Benton-Scooteney No. 1 115-kilovolt (kV) transmission line, the attached vertically mounted disconnect switch, and current guy wiring with a new, 30-foot wide, three-pole transposition structure, a new horizontally mounted disconnect switch, and new guy wiring. In addition, a new 14-foot wide two-pole structure and a new 25?5-foot switch support structure would be installed roughly 30-feet ahead of the substation dead-end and approximately 15-feet ahead of the KD, respectively. There

338

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3, 2012 3, 2012 CX-008430: Categorical Exclusion Determination Texas-City-Grapevine CX(s) Applied: A9, B1.32, B2.5, B3.6, B5.1, B5.16, B5.17 Date: 07/03/2012 Location(s): Texas Offices(s): Energy Efficiency and Renewable Energy July 2, 2012 CX-009440: Categorical Exclusion Determination State Energy Plan Council School District Woody Biomass Project CX(s) Applied: B5.1, B5.5 Date: 07/02/2012 Location(s): Idaho Offices(s): Golden Field Office July 2, 2012 CX-008782: Categorical Exclusion Determination Danger Tree Management on North Gunnison to Skito 115 Kilovolt Transmission Line Gunnison County, Colorado CX(s) Applied: B1.3 Date: 07/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region July 2, 2012 CX-008781: Categorical Exclusion Determination

339

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81 - 15590 of 28,905 results. 81 - 15590 of 28,905 results. Download CX-003195: Categorical Exclusion Determination Oracle-Tucson 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B4.13 Date: 06/10/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region http://energy.gov/nepa/downloads/cx-003195-categorical-exclusion-determination Download CX-003358: Categorical Exclusion Determination American Recovery and Reinvestment Act State Energy Program State of Texas Southmost College - Photovoltaic - Wind Hybrid System CX(s) Applied: B5.1 Date: 08/11/2010 Location(s): Brownsville, Texas Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-003358-categorical-exclusion-determination

340

EA-1636: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EA-1636: Mitigation Action Plan Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project This Mitigation Action Plan (MAP) is part of the Finding of No Significant Impact (FONSI) for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project. The project involves replacing wood pole structures on about 26 miles of the Albany-Burnt Woods single-circuit, 115-kilovolt (kV) transmission line and about 21 miles of the Santiam-Toledo single circuit, 230-kVtransmission line in Linn, Benton and Lincoln counties, Oregon. Mitigation Action Plan for the Albany-Burnt Woods and Santiam-Toledo Pole Replacement Project More Documents & Publications EA-1636: Final Environmental Assessment EA-1636: Finding of No Significant Impact

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

91 - 13400 of 31,917 results. 91 - 13400 of 31,917 results. Download CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 06/20/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008693-categorical-exclusion-determination Download CX-008694: Categorical Exclusion Determination Acquisition and Disposition of Property CX(s) Applied: B1.24 Date: 06/20/2012 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008694-categorical-exclusion-determination Download Independent Activity Report, Savannah River Remediation- July 2010 Savannah River Operations Office Integrated Safety Management System Phase

342

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31 - 30240 of 31,917 results. 31 - 30240 of 31,917 results. Download CX-008709: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008709-categorical-exclusion-determination Download CX-008713: Categorical Exclusion Determination 2012 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008713-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV),

343

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

21 - 17230 of 28,905 results. 21 - 17230 of 28,905 results. Page EIS-0470: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy Project on the Outer Continental Shelf off Massachusetts, Nantucket Sound The DOE Loan Programs Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. To inform DOE's decision regarding a loan guarantee, DOE adopted the Department of the Interior's 2009 Final Cape Wind Energy Project EIS,

344

CX-004263: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-004263: Categorical Exclusion Determination L0295 - Saint Johns-Saint Helens Number 1 Interconnection Project CX(s) Applied: B4.6 Date: 10/15/2010 Location(s): Columbia County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to install a new tap and associated disconnect structures on BPA?s Saint Johns-Saint Helens Number 1 115-kilovolt (kV) transmission line to provide a point of interconnection for Columbia River Public Utility District's (CRPUD's) new Columbia River Substation. CRPUD is constructing the new 115-kV substation in Columbia County, Oregon to serve residential load growth in the area. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004263.pdf More Documents & Publications

345

EA-1855: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission line. The 54-mile long, wood pole line extends from the BPA Creston substation to the BPA Bell substation in Lincoln and Spokane Counties, Washington. The project would include replacing wood poles, associated structural components, and conductor, improvements to some existing access roads, construction of 10 miles of new access roads, and some vegetation removal. The rebuild would enable BPA to maintain reliable electric service and avoid risks to the public and worker safety. The line would continue to operate at 115-kV. EA-1855-DEA-2012-BPA-Creston-Bell.pdf More Documents & Publications

346

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31 - 27540 of 28,904 results. 31 - 27540 of 28,904 results. Download CX-009088: Categorical Exclusion Determination Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3 Date: 08/07/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-009088-categorical-exclusion-determination Download CX-009093: Categorical Exclusion Determination Knolls Laboratory Q14 Sprinkler System Upgrade Project CX(s) Applied: B1.15, B2.2 Date: 08/03/2012 Location(s): New York Offices(s): Naval Nuclear Propulsion Program http://energy.gov/nepa/downloads/cx-009093-categorical-exclusion-determination Download CX-009101: Categorical Exclusion Determination Monosodium Titanate (MST) Rheology

347

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

June 12, 2012 June 12, 2012 CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008697: Categorical Exclusion Determination Sale of Line Mile 1 of the 115 Kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line CX(s) Applied: B1.24 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration June 5, 2012 CX-008702: Categorical Exclusion Determination Forest Grove-McMinnville #1 Wood Pole Replacement Projects

348

Microsoft Word - CX-Drummond-MacksInn-WoodPoleReplacementFY13_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

29, 2012 29, 2012 REPLY TO ATTN OF: KEP-CELILO SUBJECT: Environmental Clearance Memorandum Mark Hadley Lineman Foreman III - TFIF-Idaho Falls Proposed Action: Wood pole replacements along the Drummond-Macks Inn, Macks Inn- Madison, and Swan Valley-Teton 115-kilovolt (kV) transmission line rights-of-way. PP&A Project Number: 2486 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The project area is located in Bonneville Power Administration's (BPA) Idaho Falls District. Project locations are listed below: Project Location Township Range Section(s) County Line Name Structures Use Ownership 3N 44E 28 Teton Swan Valley - Teton 10/6 Forest Forest Service 14S 5E 19 Fremont

349

Categorical Exclusion Determinations: Nebraska | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Nebraska Nebraska Categorical Exclusion Determinations: Nebraska Location Categorical Exclusion Determinations issued for actions in Nebraska. DOCUMENTS AVAILABLE FOR DOWNLOAD August 20, 2013 CX-010891: Categorical Exclusion Determination Archer-Stegall 230-Kilovolt Fiber Optic Ground Wire Addition CX(s) Applied: B4.7 Date: 08/20/2013 Location(s): Nebraska, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region August 8, 2013 CX-010887: Categorical Exclusion Determination Archer-Sidney 115-Kilovolt Transmission Line Structure Replacement CX(s) Applied: B4.13 Date: 08/08/2013 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region June 4, 2013 CX-010549: Categorical Exclusion Determination Chappell, Julesburg, and Kersey Tap Line Switch Replacements in Deuel

350

CX-007130: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

30: Categorical Exclusion Determination 30: Categorical Exclusion Determination CX-007130: Categorical Exclusion Determination Casa Grande-Empire CX(s) Applied: B3.1 Date: 09/14/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to do geologic borings within our right-of-way near structures 18/5, 19/6, 21/2, 2317, 26/4, 28/4, 36/1, 37/5, 39/4 and 41/4 along the existing Casa Grande-electrical district #5 115-kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring personnel and equipment to the work areas.

351

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

41 - 2950 of 28,905 results. 41 - 2950 of 28,905 results. Download CX-006303: Categorical Exclusion Determination Interconnection of the Pronghorn Gas Plant 115 Kilovolt Transmission Line CX(s) Applied: B4.11 Date: 07/14/2011 Location(s): Montana Office(s): Western Area Power Administration-Upper Great Plains Region http://energy.gov/nepa/downloads/cx-006303-categorical-exclusion-determination Download CX-006110: Categorical Exclusion Determination Virginia-City-Alexandria CX(s) Applied: A1, A9, A11, B5.1 Date: 06/21/2011 Location(s): Alexandria, Virginia Office(s): Energy Efficiency and Renewable Energy http://energy.gov/nepa/downloads/cx-006110-categorical-exclusion-determination Download CX-006031: Categorical Exclusion Determination Oregon-Tribe-Confederated Tribes of the Grand Ronde Community of Oregon

352

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 20, 2013 June 20, 2013 CX-010551: Categorical Exclusion Determination Alcova-Miracle Mile East 115 Kilovolt Transmission Line Structure Replace and Road Maintenance, Carbon and Natrona Counties, Wyoming CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region June 20, 2013 CX-010655: Categorical Exclusion Determination Roof Repair on Crane Maintenance Area Roof CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010656: Categorical Exclusion Determination Stormwater Drainage Repair CX(s) Applied: B1.3 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 17, 2013 CX-010662: Categorical Exclusion Determination

353

CX-006302: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

302: Categorical Exclusion Determination 302: Categorical Exclusion Determination CX-006302: Categorical Exclusion Determination Colville-Republic Rebuild Project CX(s) Applied: B1.3, B4.6 Date: 07/21/2011 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures along approximately 13.5 miles of the Colville-Republic No. 1 115 kilovolt (kV) transmission line (structures 1/1-14/5). BPA would replace wood pole structures in kind and at their currently existing locations. In addition to pole replacement, BPA would replace structure crossarms, insulators, dampers and conductor. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006302.pdf More Documents & Publications CX-010439: Categorical Exclusion Determination

354

CX-008378: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8378: Categorical Exclusion Determination 8378: Categorical Exclusion Determination CX-008378: Categorical Exclusion Determination Archer 230 Kilovolt Bay Addition for New Point of Delivery - Stage 07 CX(s) Applied: B4.6 Date: 03/08/2012 Location(s): CX: none Offices(s): Western Area Power Administration-Rocky Mountain Region Tri-State Generation and Transmission Association, Inc. (Tri-State), has requested an interconnection to Western Area Power Administration's (Western) Archer 230/115-Kilovolt (kV) Substation (Archer Substation). The Archer Substation is a Designated Point of Delivery from Western to Tri-State as set forth in Exhibit A of Contract No. 87-LAO-172 (TS-89-0005), Finn Electric Service (Contract). CX-008378.pdf More Documents & Publications CX-010891: Categorical Exclusion Determination

355

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51: Draft Environmental Impact Statement 51: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

356

EIS-0470: U.S. Department of Energy Loan Guarantee for the Cape Wind Energy Project on the Outer Continental Shelf off Massachusetts, Nantucket Sound  

Broader source: Energy.gov [DOE]

The DOE Loan Programs Office is proposing to offer a loan guarantee to Cape Wind Associates, LLC for the construction and start-up of the Cape Wind Energy Project in Nantucket Sound, offshore of Massachusetts. The proposed Cape Wind Energy Project would consist of up to 130, 3.6-MW turbine generators, in an area of roughly 25-square miles, and would include 12.5 miles of 115-kilovolt submarine transmission cable and an electric service platform. To inform DOE's decision regarding a loan guarantee, DOE adopted the Department of the Interior’s 2009 Final Cape Wind Energy Project EIS, in combination with two Cape Wind Environmental Assessments dated May 2010 and April 2011 (per 40 CFR 1506.4), as a DOE Final EIS (DOE/EIS-0470). The adequacy of the Department of the Interior final EIS adopted by DOE is the subject of a judicial action.

357

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0, 2013 0, 2013 CX-010418: Categorical Exclusion Determination Eastern Colorado Field Office Com Buildings Removal CX(s) Applied: B1.22, B1.23, B1.24 Date: 05/20/2013 Location(s): Colorado, Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region May 20, 2013 CX-010523: Categorical Exclusion Determination Fracture Evolution Following Hydraulic Stimulations within EGS Reservoirs CX(s) Applied: A9, B3.1, B3.6 Date: 05/20/2013 Location(s): Utah Offices(s): Golden Field Office May 20, 2013 CX-010407: Categorical Exclusion Determination Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line Access Road Maintenance between Structure 26/8 and 26/9 CX(s) Applied: B1.3 Date: 05/20/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

358

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

01 - 1710 of 26,777 results. 01 - 1710 of 26,777 results. Download CX-000603: Categorical Exclusion Determination Baseload Energy Inc. Brasada-Harney 115-kilovolt Transmission Line Project CX(s) Applied: B4.6 Date: 02/04/2010 Location(s): Deschutes County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-000603-categorical-exclusion-determination Article Energy Department Investments to Develop Lighter, Stronger Materials for Greater Vehicle Fuel Economy Seven Projects Will Speed Commercialization of Lightweighting and Propulsion Technologies http://energy.gov/articles/energy-department-investments-develop-lighter-stronger-materials-greater-vehicle-fuel Download FIA-13-0036- In the Matter of Sierra Club On June 25, 2013, the Office of Hearings and Appeals (OHA) issued a

359

EIS-0457: Final Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

57: Final Environmental Impact Statement 57: Final Environmental Impact Statement EIS-0457: Final Environmental Impact Statement Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the potential environmental impacts of a Bonneville Power Administration (BPA) proposal to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line. This line extends from the Albany Substation in the City of Albany, Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. BPA issued the Draft EIS in January 2012 for public review. BPA considered all comments received to prepare this Comment-Response Addendum (download below) which, together with the Draft EIS, consitutes the Final EIS [40 CFR 1503.4(c)]. The Comment-Response Addendum includes a chapter

360

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51 - 24260 of 31,917 results. 51 - 24260 of 31,917 results. Download CX-003196: Categorical Exclusion Determination Emergency Crossarm Replacement at Structure 39/7 and Access Road Maintenance along the Existing Tucson-Apache 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B1.3 Date: 07/08/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region http://energy.gov/nepa/downloads/cx-003196-categorical-exclusion-determination Download CX-003136: Categorical Exclusion Determination Collect Soil Samples Near the Chariot, Alaska Site CX(s) Applied: B3.1 Date: 07/07/2010 Location(s): Cape Thompson, Alaska Office(s): Legacy Management http://energy.gov/nepa/downloads/cx-003136-categorical-exclusion-determination Download CX-003621: Categorical Exclusion Determination

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

NREL: Transmission Grid Integration - Webinars  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Webinars Webinars Want updates about future transmission grid integration webinars and publications? Join our mailing list. NREL periodically offers webinars on transmission grid integration topics to provide insight into its research. Explore the resources below to learn more. Upcoming Webinars Please check back. Details on future meetings and workshops will be posted as they are available. Past Webinars Results from The Western Wind and Solar Integration Study Phase 2: An examination of how wind and solar power affect operations, costs, and emissions from fossil-fueled generators Wednesday, September 25, 2013 at 12:00 EDT (10:00 MDT) The Western Wind and Solar Integration Study Phase 2 (WWSIS-2), launched in 2011, examines the potential impacts of up to 33% wind and solar energy

362

DOE Electricity Transmission System Workshop  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION SYSTEM WORKSHOP TRANSMISSION SYSTEM WORKSHOP Mapping Challenges and Opportunities to Help Guide DOE R&D Investments over the Next Five Years DoubleTree Crystal City, 300 Army Navy Drive, Arlington, VA November 1-2, 2012 AGENDA Thursday, November 1, 2012 8:00-8:10 Welcome and Kickoff David Sandalow, Acting Undersecretary of Energy 8:10-8:30 Introduction to the Grid Tech Team (GTT), Vision, and Framework Distribution Workshop Summary Dr. Anjan Bose, Grid Tech Team Lead 8:30-8:50 OE Vision, Activities, and Issues Patricia A. Hoffman, Assistant Secretary for the Office of Electricity Delivery and Energy Reliability (OE) 8:50-9:10 EERE Vision, Activities, and Issues Dr. David Danielson, Assistant Secretary for the Office of Energy Efficiency and Renewable Energy (EERE)

363

transmission | OpenEI Community  

Open Energy Info (EERE)

21 21 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235321 Varnish cache server transmission Home Kyoung's picture Submitted by Kyoung(155) Contributor 12 November, 2012 - 09:17 Legal Reviews are Underway BHFS Legal review permitting power plant roadmap transmission The legal review of the Regulatory Roadmap flowcharts and supporting content is well underway and will continue for the next several months with our legal team at [www.bhfs.com Brownstein Hyatt Farber and Schreck]. The

364

Recovery Act Interconnection Transmission Planning  

Broader source: Energy.gov [DOE]

Robust and reliable transmission and distribution networks are essential to achieving the Administration's clean energy goals, including the development, integration, and delivery of new renewable and other low-carbon resources in the electricity sector, and the use of these resources to displace petroleum-based fuels in the transportation sector. OE is helping to strengthen the capabilities for long-term analysis and planning in the three interconnections serving the lower 48 United States.

365

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

366

Definition: Transmission Service | Open Energy Information  

Open Energy Info (EERE)

Service Service Jump to: navigation, search Dictionary.png Transmission Service Services provided to the Transmission Customer by the Transmission Service Provider to move energy from a Point of Receipt to a Point of Delivery.[1] Related Terms transmission lines, Transmission Customer, Transmission Service Provider, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Service&oldid=480302" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

367

Arizona/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Arizona‎ | Transmission Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Arizona, the state has the authority to site high-voltage transmission lines. A public service corporation would need to obtain a Certificate of Environmental Compatibility (CEC) from the Arizona Power Plant and Transmission Line Siting Committee that is "affirmed and approved" by the Arizona Corporation Commission (ACC). State Siting Act Arizona Revised Statute (A.R.S.)§ 40-360 et seq. State Preemptive Authority If the Transmission Line Siting Committee (TLSC) finds that compliance with local ordinances, master plan or regulation is unreasonably restrictive and compliance is not feasible in view of technology available, then the TLSC may grant a certificate.[1]

368

Georgia Transmission Corp | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 7197 Utility Location Yes Ownership T NERC Location SERC NERC SERC Yes Activity Transmission Yes Activity Buying Transmission...

369

Ebola virus transmission in guinea pigs  

Science Journals Connector (OSTI)

...Rights Reserved. 2014 research-article Ebola virus transmission in guinea pigs Gary...School of Medicine, Philadelphia, PA, USA Ebola virus (EBOV) transmission is currently...movement over short distances. Importance Ebola is generally thought to be spread between...

Gary Wong; Xiangguo Qiu; Jason S. Richardson; Todd Cutts; Brad Collignon; Jason Gren; Jenna Aviles; Carissa Embury-Hyatt; Gary P. Kobinger

2014-11-12T23:59:59.000Z

370

MagLab - Transmission Lines Tutorial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tweet Education Home > MagLab U > Interactive Tutorials Arrow Transmission Lines More than half a million miles of high-voltage transmission lines criss-cross the United States. If...

371

Transmission Issues and Power Exchanges in Texas  

E-Print Network [OSTI]

on the transmission owning utilities by several parties, primary distribution cooperatives, cogenerators, and large industrial customers, to grant wider access to the system. This pressure is coming at a time when transmission lines are becoming increasingly difficult...

Hughes, H. L.

372

Vibration Transmission through Symmetric Resonant Couplings  

Science Journals Connector (OSTI)

15 March 1994 research-article Vibration Transmission through Symmetric Resonant Couplings D. J. Allwright...Blakemore P. R. Brazier-Smith J. Woodhouse The transmission of vibration through a symmetric junction is considered. The problem is...

1994-01-01T23:59:59.000Z

373

EEI/DOE Transmission Capacity Report  

Broader source: Energy.gov (indexed) [DOE]

TRANSMISSION CAPACITY: TRANSMISSION CAPACITY: PRESENT STATUS AND FUTURE PROSPECTS Eric Hirst Consulting in Electric-Industry Restructuring Bellingham, Washington June 2004 Prepared for Energy Delivery Group Edison Electric Institute Washington, DC Russell Tucker, Project Manager and Office of Electric Transmission and Distribution U.S. Department of Energy Washington, DC Larry Mansueti, Project Manager ii iii CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF ACRONYMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. TRANSMISSION CAPACITY: DATA AND PROJECTIONS . . . . . . . . . . . . . . . . . . . 5 HISTORICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 CURRENT CONDITIONS . . . . . . .

374

Mountain States Transmission Intertie (MSTI) Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

375

Sandia National Laboratories: Transmission Grid Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure Security, Modeling, Modeling & Analysis, News, News & Events, Renewable Energy, SMART Grid, Systems Analysis, Transmission Grid Integration, Wind Energy Sandia...

376

Integrated Transmission and Distribution Control  

SciTech Connect (OSTI)

Distributed, generation, demand response, distributed storage, smart appliances, electric vehicles and renewable energy resources are expected to play a key part in the transformation of the American power system. Control, coordination and compensation of these smart grid assets are inherently interlinked. Advanced control strategies to warrant large-scale penetration of distributed smart grid assets do not currently exist. While many of the smart grid technologies proposed involve assets being deployed at the distribution level, most of the significant benefits accrue at the transmission level. The development of advanced smart grid simulation tools, such as GridLAB-D, has led to a dramatic improvement in the models of smart grid assets available for design and evaluation of smart grid technology. However, one of the main challenges to quantifying the benefits of smart grid assets at the transmission level is the lack of tools and framework for integrating transmission and distribution technologies into a single simulation environment. Furthermore, given the size and complexity of the distribution system, it is crucial to be able to represent the behavior of distributed smart grid assets using reduced-order controllable models and to analyze their impacts on the bulk power system in terms of stability and reliability. The objectives of the project were to: • Develop a simulation environment for integrating transmission and distribution control, • Construct reduced-order controllable models for smart grid assets at the distribution level, • Design and validate closed-loop control strategies for distributed smart grid assets, and • Demonstrate impact of integrating thousands of smart grid assets under closed-loop control demand response strategies on the transmission system. More specifically, GridLAB-D, a distribution system tool, and PowerWorld, a transmission planning tool, are integrated into a single simulation environment. The integrated environment allows the load flow interactions between the bulk power system and end-use loads to be explicitly modeled. Power system interactions are modeled down to time intervals as short as 1-second. Another practical issue is that the size and complexity of typical distribution systems makes direct integration with transmission models computationally intractable. Hence, the focus of the next main task is to develop reduced-order controllable models for some of the smart grid assets. In particular, HVAC units, which are a type of Thermostatically Controlled Loads (TCLs), are considered. The reduced-order modeling approach can be extended to other smart grid assets, like water heaters, PVs and PHEVs. Closed-loop control strategies are designed for a population of HVAC units under realistic conditions. The proposed load controller is fully responsive and achieves the control objective without sacrificing the end-use performance. Finally, using the T&D simulation platform, the benefits to the bulk power system are demonstrated by controlling smart grid assets under different demand response closed-loop control strategies.

Kalsi, Karanjit; Fuller, Jason C.; Tuffner, Francis K.; Lian, Jianming; Zhang, Wei; Marinovici, Laurentiu D.; Fisher, Andrew R.; Chassin, Forrest S.; Hauer, Matthew L.

2013-01-16T23:59:59.000Z

377

BPA, Electric Transmission Overview, October 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Electric Transmission Overview Electric transmission Electric transmission is the process by which large amounts of...

378

The real problem with Merchant transmission  

SciTech Connect (OSTI)

Current regulatory policy distinguishes transmission investments that have primarily economic benefits from those that primarily enhance reliability. But no such dichotomy exists; congestion and reliability are inter-related in complex ways. Thus, solving the transmission investment problem is more complex than ''fixing'' merchant transmission; investment in the grid must be treated as a systems problem. (author)

Blumsack, Seth; Lave, Lester B.; Ilic, Marija

2008-03-15T23:59:59.000Z

379

Spectral Theory for Nonconservative Transmission Line Networks  

E-Print Network [OSTI]

Spectral Theory for Nonconservative Transmission Line Networks Robert Carlson Department The global theory of transmission line networks with nonconserva- tive junction conditions is developed from is determined. Specialized results are developed for rational graphs. 1 #12;1 Introduction The transmission line

Carlson, Bob

380

Fact #802: November 4, 2013 Market Share by Transmission Type...  

Energy Savers [EERE]

2: November 4, 2013 Market Share by Transmission Type Fact 802: November 4, 2013 Market Share by Transmission Type The variety of transmission technologies has increased as...

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Western-UGP Transmission and Ancillary Services Rates Customer...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

80 Percentage of transmission plant included in UMZ Rates (line 79 line 76) TP 1.00000 TRANSMISSION EXPENSES 81 Total transmission expenses (sum lines 41 to 43,...

382

RAPID/BulkTransmission/About | Open Energy Information  

Open Energy Info (EERE)

Contribute Contact Us About Bulk Transmission Lattice.jpg High-voltage transmission lines form the backbone of electricity systems. Transmission lines are designed to carry...

383

RAPID/Geothermal/Transmission Siting & Interconnection/Nevada...  

Open Energy Info (EERE)

Siting Agency: Public Utilities Commission of Nevada Transmission Siting Transmission lines over 200 kV are handled by the state's CPCN process. Siting of transmission lines with...

384

Colorado/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Colorado/Transmission/Roadmap < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

385

SunZia Southwest Transmission Project Comments  

Broader source: Energy.gov (indexed) [DOE]

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

386

California/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Roadmap < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations.

387

Arizona/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Roadmap Roadmap < Arizona‎ | Transmission Jump to: navigation, search ArizonaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

388

Relativistic tunneling and accelerated transmission  

E-Print Network [OSTI]

We obtain the solutions for the tunneling zone of a one-dimensional electrostatic potential in the relativistic (Dirac to Klein-Gordon) wave equation regime when the incoming wave packet exhibits the possibility of being almost totally transmitted through the potential barrier. The conditions for the occurrence of accelerated and, eventually, superluminal tunneling transmission probabilities are all quantified and the problematic superluminal interpretation originated from the study based on non-relativistic dynamics of tunneling is overcome. The treatment of the problem suggests revealing insights into condensed-matter experiments using electrostatic barriers in single- and bi-layer graphene, for which the accelerated tunneling effect deserves a more careful investigation.

Alex E. Bernardini

2007-06-26T23:59:59.000Z

389

FPL's Christmas 1991 transmission outages  

SciTech Connect (OSTI)

A record number of contamination related outages occurred on FPL transmission lines during Christmas of 1991 and resulted in an investigation of inservice insulator performance. The field investigation process used was enhanced by recent improvements in outage data recording. Also used in the analysis were weather information, the results of recently completed accelerated aging tests of polymers, and specially conducted tests on the effects of weathering steel stain on porcelain insulators. Specific insulator problems were identified and actions taken to reduce the possibility of recurrence.

Burnham, J.T.; Busch, D.W.; Renowden, J.D. (Florida Power Light Co., Juno Beach, FL (United States). Transmission Line Dept.)

1993-10-01T23:59:59.000Z

390

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

391

Idaho/Transmission/Roadmap | Open Energy Information  

Open Energy Info (EERE)

Idaho/Transmission/Roadmap Idaho/Transmission/Roadmap < Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The flowcharts listed below cover the major requirements for developing transmission - both interconnects and major, multi-jurisdictional lines - including, land access, siting, and relevant environmental considerations. Reading the Roadmap The flowcharts are divided into General, Federal, and State columns to allow for ease of use. To use the flowcharts, start with General Flowchart for Section 8: Transmission. The General Flowchart will lead you to the

392

Idaho/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Idaho, the state's siting authority is limited to siting approvals on state property, and high voltage transmission lines (115kV or greater) within a National Interstate Electric Transmission Corridor (NIETC). Under these circumstances a Route Permit would be required by the Idaho Public Utilities Commission (IPUC); however, no such corridors have been designated and therefore the process has not been tested. Local governments

393

Colorado/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

Colorado/Transmission/Summary Colorado/Transmission/Summary < Colorado‎ | Transmission Jump to: navigation, search ColoradoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In Colorado, local governments (counties and municipalities) have the authority to site high-voltage transmission lines. The State's authority in siting is limited to a backstop appeal process, by which utilities may submit an appeal to local government decisions to the Colorado Public Utilities Commission (CPUC) for review and resolution. State Siting Act None State Preemptive Authority The CPUC has backstop authority only. If a permit is denied by the local government, the applicant may appeal to the CPUC if certain conditions are met (CRS 29-20-108).

394

Open Access Transmission and Renewable Energy Technologies  

SciTech Connect (OSTI)

In April 1996, the Federal Regulatory Commission (PERC) approved Orders 888 and 889 and released a draft rule for public comment on capacity reservation tariffs (CRTs). Order No. 888 requires electric utilities to file transmission tariffs that would allow transmission access to third parties who want to conduct wholesale transactions, and Order No. 889 requires transmission-owning utilities to set up open access, same-time information systems (OASIS), using commercial software and Internet protocols. This paper discusses these Orders in detail, as well as some of the issues before FERC with implications for renewables, which include: transmission pricing; transmission terms and conditions; reassignment of transmission capacity; defining state and FERC jurisdiction over transmission and distribution; the pricing of ancillary services; and the adoption and implementation of independent system operators.

Porter, K.

1996-09-01T23:59:59.000Z

395

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

large, but conceptual, transmission lines such as the C/PNW-very conceptual transmission lines that resemble radialand voltage of transmission lines added in the study, as

Wiser, Ryan

2014-01-01T23:59:59.000Z

396

The Cost of Transmission for Wind Energy in the United States: A Review of Transmission Planning Studies.  

E-Print Network [OSTI]

wind with transmission alternative 7b (500 kV AC line fromkV line CAISO - A4 Central California Clean Energy TransmissionTransmission Line: Transmission Development Facilities Application Volume One MATL New 230 kV

Wiser, Ryan

2014-01-01T23:59:59.000Z

397

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

398

Magnetically insulated transmission line oscillator  

DOE Patents [OSTI]

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

399

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

400

New Mexico/Transmission | Open Energy Information  

Open Energy Info (EERE)

New Mexico/Transmission New Mexico/Transmission < New Mexico Jump to: navigation, search NewMexicoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in New Mexico is part of the Southwest Area Transmission power grid which is part of the WestConnect Transmission Planning area, and covers the desert southwest of the United States. The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting Bulk Electric System reliability in the Western Interconnection, including in New Mexico. In addition, WECC provides an environment for coordinating the operating and planning

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Transmission/Resource Library | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Transmission/Resource Library < Transmission Jump to: navigation, search ResourceLibraryHeader.png Public Involvement Resources GIS Tools and Maps Environmental Resources and Mitigation NEPA MOUs General Transmission Documents Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database About Transmission Electricity Transmission: A Primer Overview of the grid system and the role of states in overseeing this system. The Design, Construction, and Operation of Long-Distance High-Voltage

402

Regional Transmission Planning Webinar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Regional Transmission Planning Webinar Regional Transmission Planning Webinar Regional Transmission Planning Webinar May 29, 2013 11:00AM MDT Webinar The U.S. Department of Energy (DOE) Office of Indian Energy Policy and Programs, Office of Energy Efficiency and Renewable Energy Tribal Energy Program, and Western Area Power Administration (WAPA) are pleased to continue their sponsorship of the Tribal Renewable Energy Webinar Series. As part of a process to develop interconnection-based transmission plans for the Eastern and Western Interconnections and the Electric Reliability Council of Texas (ERCOT), the eight U.S. regional reliability organizations are expanding existing regional transmission planning activities and broadening stakeholder involvement. Hear about the status of the organizations' plans and evaluations of long-term regional transmission

403

California/Transmission/Summary | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » California/Transmission/Summary < California‎ | Transmission Jump to: navigation, search CaliforniaTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database Transmission Permitting at a Glance In California, the California Public Utilities Commission (CPUC) has authority to site transmission lines of 200kV or higher. The CPUC is authorized to approve or deny the applicant's request for the Certificate

404

Transmission Electron Microscope and Scanning Electron Microscopes -  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities > Transmission Electron Facilities > Transmission Electron Microscope and Scanning Electron Microscopes FACILITIES Transmission Electron Microscope and Scanning Electron Microscopes Overview Other Facilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Transmission Electron Microscope and Scanning Electron Microscopes The research activities of the Corrosion and Mechanics of Materials Section are supported by complete metallography/sample preparation rooms equipped with several optical and electron microscopes: a Transmission Electron Microscope and two Scanning Electron Microscopes. Bookmark and Share Transmission electron microscope (TEM) Detail of JEOL 100CXII TEM Figure 1: Detail of JEOL 100CXII TEM. Click on image to view larger image.

405

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Journal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Line Project Project Overview Map 0 2 4 6 8 10 1 Miles BPA Transmission Line * BPA Substation " Federal Dam Central Ferry-Lower Monumental Transmission Line County...

406

Olympia-Grand Coulee No. 1  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission...

407

Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners  

Broader source: Energy.gov [DOE]

Application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the U.S. - Canada border.

408

NREL: Transmission Grid Integration - Research Staff  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Staff Research Staff NREL's transmission grid integration research staff work to incorporate renewable energy into the transmission system primarily through NREL's Power Systems Engineering Center. Photo of Barbara O'Neill Barbara O'Neill, Transmission and Grid Integration Group Manager M.S., Energy Management and Policy, University of Pennsylvania Engineering Diploma, Petroleum Economics and Management, French Institute of Petroleum B.S., Electrical Engineering, Pratt Institute Barbara has a diverse background with expertise in such fields as wind and solar project development, energy forecasting, renewable energy power purchase agreements, interconnection issues, market structures, and stakeholder engagement. Barbara currently manages the Transmission and Grid

409

RRTT - Rapid Response Team for Transmission  

Broader source: Energy.gov (indexed) [DOE]

Rapid Response Team- Rapid Response Team- Transmission Exploring the Business Link Opportunity: Transmission & Clean Energy Development in the West TRIBAL LEADER FORUM SERIES February 7, 2012 Laura Smith Morton Department of Energy Laura.morton@hq.doe.gov Nine Agency MOU * Improves uniformity, consistency, and transparency - Establishes the roles and responsibilities of the nine signatory agencies regarding electric transmission infrastructure project applicants * Provides single point of contact for coordinating all federal authorizations required to locate electric transmission facilities on federal land * Establishes DOE (under authority pursuant to section 216(h) of the FPA) as lead agency for coordinating all federal authorizations and related environmental

410

Richard Shaheen named Senior VP of Transmission  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and operational accomplishments that will serve BPA well as we continue to strengthen our safety culture, sustain our core transmission assets and modernize our electric grid."...

411

Category:NEPA Transmission | Open Energy Information  

Open Energy Info (EERE)

Pages in category "NEPA Transmission" This category contains only the following page. T TransWest Retrieved from "http:en.openei.orgwindex.php?titleCategory:NEPATransmiss...

412

Intelligent fault diagnosis of power transmission line; -.  

E-Print Network [OSTI]

??This dissertation presents the application of recent intelligent newlinetechniques for fault diagnosis in electrical power transmission line Fault newlinesection identification classification and location are the… (more)

Malathi, V

2014-01-01T23:59:59.000Z

413

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

414

Natural Gas Transmission and Distribution Module  

U.S. Energy Information Administration (EIA) Indexed Site

31, 2012, Washington, DC Major assumption changes for AEO2013 Oil and Gas Working Group Natural Gas Transmission and Distribution Module DRAFT WORKING GROUP PRESENTATION DO NOT...

415

Detonator comprising a nonlinear transmission line  

DOE Patents [OSTI]

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

416

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect (OSTI)

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

417

Hydrogen Delivery Technologies and Systems - Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Technologies and Systems Pipeline Transmission of Hydrogen Strategic Initiatives for Hydrogen Delivery Workshop May 7- 8, 2003 U.S. Department of Energy Hydrogen, Fuel Cells,...

418

Nevada Transmission Siting Information | Open Energy Information  

Open Energy Info (EERE)

Siting Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Nevada Transmission Siting...

419

Transmission/Permitting Atlas | Open Energy Information  

Open Energy Info (EERE)

mittingAtlasHeader.png Roadmap Compare States General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah...

420

Webinar: Understanding the Interconnection and Transmission Service...  

Broader source: Energy.gov (indexed) [DOE]

Tribal Energy Sufficiency and Economic Development U.S. Department of Energy Schedules Regional Workshops to Provide Expert Input on 2009 Transmission Congestion Study U.S....

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Iran Thomas Auditorium, 8600 Environmental Transmission Electron...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 26, 2012 11:00 am Iran Thomas Auditorium, 8600 Environmental Transmission Electron Microscopy for Catalysis Research: The Example of Carbon Nanotubes Eric A. Stach Center for...

422

Electricity Transmission, A Primer | Open Energy Information  

Open Energy Info (EERE)

A Primer Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Electricity Transmission, A Primer Authors Matthew H. Brown, National Conference of State...

423

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

424

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

425

Exploring the Business Link Opportunity: Transmission & Clean...  

Energy Savers [EERE]

Jennifer Weddle, Greenberg Traurig LLP Rapid Response Team for Transmission: Laura Smith Morton, DOE Energy Storage: Michael Stosser, Day Pitney LLP Centennial West Clean...

426

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

427

Crews repair transmission lines after Washington wildfire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Privacy Publications Tribal Affairs Newsroom Search News Articles... Search Crews repair transmission lines after Washington wildfire 662014 12:00 AM Tweet Page Content BPA...

428

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

429

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

430

Comments of New England Electric Transmission Corporation on Proposed Open  

Broader source: Energy.gov (indexed) [DOE]

New England Electric Transmission Corporation on New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities Motion to intervene out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and New England Power Company. Comments of New England Electric Transmission Corporation on Proposed Open Access Requirement for International Electric Transmission Facilities FE Docket No 99-1 (PP-76/EA-76) More Documents & Publications Ontario Power Generation Motion to Intervene & Comments in FE Docket No.

431

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

SEC). 2008. Form 10-K: Xcel Energy Inc. http://www.sec.gov/cost of transmission proposed in Xcel Energy 2001). SouthernApril. http://www.ftloutreach.com Xcel Energy Transmission

Mills, Andrew D.

2009-01-01T23:59:59.000Z

432

A CRITICAL REVIEW OF WIND TRANSMISSION COST ESTIMATES FROM MAJOR TRANSMISSION PLANNING EFFORTS  

E-Print Network [OSTI]

at: http://www.ftloutreach.com Xcel Energy, TransmissionCBED CapX Utilities Midwest Xcel Energy Voluntary UtilityElectric Transmission Study Xcel-31A Southwest Power Pool (

Mills, Andrew; Wiser, Ryan; Porter, Kevin

2007-01-01T23:59:59.000Z

433

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. ” Windpower 2007 Conference. Los

Mills, Andrew D.

2009-01-01T23:59:59.000Z

434

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

2006. Transmission and Wind Energy: Capturing the Prevailingand Renewable Energy (Wind & Hydropower Technologiesand Renewable Energy Wind & Hydropower Technologies Program

Mills, Andrew D.

2009-01-01T23:59:59.000Z

435

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

436

Transmission line protection based on travelling waves  

Science Journals Connector (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

437

Marketing Plan for Transmission Planning Services  

E-Print Network [OSTI]

not specifically related to transmission planning and not to outside companies who may require the help in transmission planning. It is essential that we take the market opportunity that currently exists to expand our services to our existing and new clients...

Tu, Linh

2006-12-15T23:59:59.000Z

438

TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM  

E-Print Network [OSTI]

RFC: 793 TRANSMISSION CONTROL PROTOCOL DARPA INTERNET PROGRAM PROTOCOL SPECIFICATION September 1981 Admiralty Way Marina del Rey, California 90291 #12;#12;September 1981 Transmission Control Protocol TABLE ........................................... 12 2.9 Precedence and Security ...................................... 13 2.10 Robustness Principle

McBrien, Peter

439

Physics of information representation, transmission and processing  

Science Journals Connector (OSTI)

The paper presents the theory of physical model of information representation, transmission and processing together with their features which yield into introduction of classical and quantum informatics principles. These features are mathematically described ... Keywords: information physics, information representation, quantum informatics, transmission and processing

Miroslav Svítek

2009-11-01T23:59:59.000Z

440

Ecological benefits of dc power transmission  

SciTech Connect (OSTI)

The environmental effects of dc overhead transmission lines are examined. The major effects of ac and dc transmission lines are compared. Dc lines have advantages compared to ac lines in terms of electrical safety for people under the lines, biological effects, corona losses, and clearance width.

Kutuzova, N. B. [JSC 'NIIPT' (Russian Federation)

2011-05-15T23:59:59.000Z

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Transmission Line MTF: Magnetized Target Fusion  

E-Print Network [OSTI]

Transmission Line MTF: Magnetized Target Fusion Initial target: preheated & magnetized Subsequent for the FRC. Abstract Block Diagram theta coil transmission line Bias cap. bank maincapacitor inductor PI cap compression to fusion conditions Magnetic field of at least 5 T in a closed-field line topology Density ~ 1017

442

Coordination of Federal Authorizations for Electric Transmission  

Broader source: Energy.gov (indexed) [DOE]

Coordination of Federal Authorizations for Electric Transmission Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule The utility operating companies of the American Electric Power System1 ("AEP") commend the Department of Energy ("DOE") for its ongoing commitment to implement the provisions of the Energy Policy Act of 2005 ("EPAct"), specifically, as addressed here, the DOE's continuing effort to establish procedures under which entities may request that DOE coordinate Federal authorizations for the siting of interstate transmission facilities. Coordination of Federal Authorizations for Electric Transmission Facilities-Interim Final Rule and Proposed Rule

443

Definition: Transmission Planner | Open Energy Information  

Open Energy Info (EERE)

Planner Planner Jump to: navigation, search Dictionary.png Transmission Planner The entity that develops a long-term (generally one year and beyond) plan for the reliability (adequacy) of the interconnected bulk electric transmission systems within its portion of the Planning Authority Area.[1] Related Terms transmission lines, transmission line, planning authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Transmission_Planner&oldid=502606" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties

444

CRSP Transmission Sales Rate History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Updated: 12/20/2013 Updated: 12/20/2013 CRSP Transmission Sales Rate History Rate Schedule Effective Dates Nonfirm (Mills/kWh) Firm ($/kW-yr.) Firm ($/kW-mo.) None Through 3/83 1.000 $ 6.60 $0.55 SP-FT1 4/83 - 6/86 N.A. $10.27 $0.86 SP-NFT1 4/83 - 6/86 2.000 N.A. SP-FT2 7/86 - 6/89 N.A. $15.94 $1.33 SP-NFT2 7/86 - 7/89 3.100 N.A. SP-FT3 7/89 - 9/92 N.A. $21.72 $1.81 SP-NFT3 8/89 - 3/98 Mutually Agreed N.A. SP-FT4 10/92 - 3/98 N.A. $22.68 $1.89 SP-NFT4 4/98 - 3/03 Mutually Agreed N.A. SP-PTP5 4/98 - 3/99 N.A. $26.70 $2.23 4/99 - 3/00 N.A. $26.19 $2.18 4/00 - 3/01 N.A. $26.14 $2.18 4/01 - 3/02 N.A. $25.63 $2.14 4/02 - 9/02 N.A. $21.33 $1.78 SP-NFT5 10/02 - 9/07 Mutually Agreed N.A. 10/07-9/08 Mutually Agreed N.A. SP-PTP6 10/02 - 9/03 N.A. $24.72 $2.06

445

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands  

Broader source: Energy.gov (indexed) [DOE]

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50411.pdf More Documents & Publications Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

446

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS);  

Broader source: Energy.gov (indexed) [DOE]

Phase 2 Report: Oahu Wind Integration and Transmission Study Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands. 50414.pdf More Documents & Publications Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory)

447

Instrument Series: Microscopy Environmental Transmission Electron Microscope  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Environmental Transmission Environmental Transmission Electron Microscope EMSL's environmental transmission electron microscope (ETEM) provides in situ capabilities that enable atomic-resolution imaging and spectroscopic studies of materials under dynamic operating conditions. In contrast to traditional operation of TEM under high vacuum, EMSL's ETEM uniquely allows imaging within high- temperature and gas environments-with a gas pressure up to 20 Torr. With a spherical aberration corrector for the objective lens, the ETEM captures atomic-level processes as they occur, enabling vital research across a range of scientific fields. Research Applications Chemical science and engineering - providing in situ observation of catalytic processes with atomic-level resolution Materials science and engineering - allowing

448

Electricity Transmission Pricing: How Contracts Must Reflect Costs  

Science Journals Connector (OSTI)

This article sets out the main design elements of contracts for use of a transmission system and the basic methods of transmission pricing. It considers two methods of pricing transmission: “top-down” and “bot...

Graham Shuttleworth

1996-01-01T23:59:59.000Z

449

Spatially and polarization resolved plasmon mediated transmission through continuous metal  

E-Print Network [OSTI]

Spatially and polarization resolved plasmon mediated transmission through continuous metal films Y transmission through an embedded undulated continuous thin metal film under normal incidence. 1D undulations resolved, polarization independent transmission. Whereas the needed submicron microstructure lends itself

Boyer, Edmond

450

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

451

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network [OSTI]

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

452

Virulence, parasite mode of transmission, and host fluctuating asymmetry  

Science Journals Connector (OSTI)

...they provide a potential route for vertical transmission (Hembree & Ryan 1982...the horizontalvertical transmission sequence. Dashed lines indicate the horizontal...aeg pti depends on the transmission route of its parasite Edha ardia...

1997-01-01T23:59:59.000Z

453

Introduction. Cultural transmission and the evolution of human behaviour  

Science Journals Connector (OSTI)

...some promising lines of development...learning|cultural transmission|cultural evolution...illustration of cultural transmission delivering improved...efficient over transmission events, in line with the notion...two different routes: repeated interaction...

2008-01-01T23:59:59.000Z

454

Wyoming/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Wyoming/Transmission < Wyoming Jump to: navigation, search WyomingTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Wyoming is part of the WestConnect Transmission Planning area, and covers the southwest of the United States. Within the WestConnect system, Wyoming is part of the Colorado Coordinated Planning Group (CCPG) power grid that covers Colorado and portions of Wyoming.

455

Geothermal/Transmission | Open Energy Information  

Open Energy Info (EERE)

Transmission Transmission < Geothermal Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Land Use Leasing Exploration Well Field Power Plant Transmission Environment Water Use Print PDF Geothermal Transmission General Regulatory Roadmap NEPA (5) The Geysers power plant showing condensers being retrofitted with direct contact condensers (DCCs). The DCCs were designed by NREL researchers working with Calpine Corporation for improved efficiency. With a 750-megawatt output from 14 units, the Geysers is the largest producer of geothermal power in the world. Geothermal power plants are located very close to the geothermal resource because the hot water/steam would cool down before reaching the power plant, unlike a natural gas plant which pipe gas hundreds or even thousands

456

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

457

Michigan Electric Transmission Company | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 56163 Utility Location Yes Ownership T NERC RFC Yes ISO MISO Yes Activity Transmission Yes Alt Fuel Vehicle Yes Alt Fuel...

458

American Transmission Systems Inc | Open Energy Information  

Open Energy Info (EERE)

for 2010 - File1a1 EIA Form 861 Data Utility Id 56162 Utility Location Yes Ownership T NERC Location RFC NERC RFC Yes ISO MISO Yes Activity Transmission Yes This article is a...

459

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

460

Transmission line modeling with explicit grounding representation  

Science Journals Connector (OSTI)

This paper presents a new model of an overhead transmission line for electromagnetic transient computations. The unique feature of the model is the explicit representation of the tower grounding configuration and terminal substation grounds. Other properties of the model are: (1) accurate frequency dependent parameter representation from DC to several MHz; (2) explicit modeling of line asymmetries; and (3) high numerical efficiency. The model implementation is based on the solution of the transmission line differential equations resulting in a set of step response functions, forming a matrix. The step response matrix is utilized in a time domain simulation of electric power networks by a linear convolution scheme. The transmission line model is validated with actual system test data. The model is useful for computing the ground potential rise of transmission towers due to lightning or switching surges, insulation stress, etc. Typical applications are described in the paper.

G.J. Cokkinides; A.P.Sakis Meliopoulos

1988-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

2014 Transmission Reliability Program Peer Review  

Broader source: Energy.gov [DOE]

The Transmission Reliability Program Peer Review included 20 presentations over 2 days on June 3 - 4, 2014 in Washington, DC. Presentations are available through the links. The agenda is available to download.

462

RAPID/Geothermal/Transmission Siting & Interconnection | Open...  

Open Energy Info (EERE)

in California California Energy Commission, California Energy Commission In California, transmission lines set to operate with a voltage between 50 kV and 200 kV must...

463

Transmission Policy in the United States  

E-Print Network [OSTI]

Market Design (SMD) proposal. PJM’s market rules and transmission pricing, planning and investment policies are reviewed as an articulation of FERC’s RTO and SMD visions....

Joskow, Paul

2006-03-14T23:59:59.000Z

464

National Electric Transmission Congestion Studies | Department...  

Energy Savers [EERE]

of the line or by operational directives that are created and enforced to protect the security and reliability of the grid. The term "transmission constraint" can refer to a...

465

National Electric Transmission Congestion Study- Portland Workshop  

Broader source: Energy.gov [DOE]

On December 13, 2011, DOE hosted a regional pre-study workshop in Portland, OR to receive input and suggestions concerning the National Electric Transmission Congestion Study. The workshop flyer, agenda, presentations, and full transcript are available below.

466

Executive Forum on Solutions to Transmission Investment  

E-Print Network [OSTI]

d'Hydro-Québec (IREQ) ISO New England Korea Electric Power Research Institute Michigan Electric. Business and Economics Small Groups ........................................................10 B. Planning and Transmission Investment Policy Small Groups ......................10 C. Technology Small Groups

467

Lone Star Transmission LLC | Open Energy Information  

Open Energy Info (EERE)

Zip: 33408 Product: Wholly owned subsidiary of FPL Energy, developing transmission lines. First project is the DFW Express high voltage DC line from West Texas to DallasFort...

468

Neuromotor Transmissibility of Horizontal Seatpan Vibration  

E-Print Network [OSTI]

Exposure to occupational whole body vibration (WBV) is associated with low back pain disorders, musculoskeletal disorders, and degeneration of spine. Transmission of vibration to the neuromotor system may play a role in the etiology...

Channamallu, Raghu Ram

2007-12-16T23:59:59.000Z

469

Data transmission element for downhole drilling components  

DOE Patents [OSTI]

A robust data transmission element for transmitting information between downhole components, such as sections of drill pipe, in the presence of hostile environmental conditions, such as heat, dirt, rocks, mud, fluids, lubricants, and the like. The data transmission element components include a generally U-shaped annular housing, a generally U-shaped magnetically conductive, electrically insulating element such as ferrite, and an insulated conductor. Features on the magnetically conducting, electrically insulating element and the annular housing create a pocket when assembled. The data transmission element is filled with a polymer to retain the components within the annular housing by filling the pocket with the polymer. The polymer can bond with the annular housing and the insulated conductor but preferably not the magnetically conductive, electrically insulating element. A data transmission element is mounted within a recess proximate a mating surface of a downhole drilling component, such as a section of drill pipe.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Dahlgren, Scott (Provo, UT); Fox, Joe (Spanish Fork, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT)

2006-01-31T23:59:59.000Z

470

Gila to North Gila Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gila to North Gila Transmission Line Rebuild and Upgrade Project News and updates: On March 21, 2014, Western issued a Finding of No Significant Impact for the proposed action,...

471

Synthesis of Lumped Transmission-Line Analogs  

E-Print Network [OSTI]

Transmission lines and their lumped approximating networks have long been incorporated into radio-frequency power amplifiers to improve efficiency and shape circuit waveforms and are beginning to perform a similar roles ...

Phinney, Joshua W.

472

TransWest Express Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

operate, maintain and decommission the TransWest Express 600-kV Direct Current Transmission Project. TransWest Express, LLC is a whollyowned subsidiary of the Anschutz...

473

Electric Power Generation and Transmission (Iowa)  

Broader source: Energy.gov [DOE]

Electric power generating facilities with a combined capacity greater than 25 MW, as well as associated transmission lines, may not be constructed or begin operation prior to the issuance of a...

474

1 Introduction Danish transmission system operator  

E-Print Network [OSTI]

a new 400 kV transmission line between the cities Aarhus and Aalborg, app 90 km. This line at the 150 kV transmission level and intended to be used at 400 kV more than just for this line. Can of the dynamic behavior of a shunt reactor compensated 400 kV combined cable/overhead line. This is accomplished

Bak, Claus Leth

475

DOE EAC Electricity Adequacy Report. Transmission Section - September 15,  

Broader source: Energy.gov (indexed) [DOE]

Transmission Section - Transmission Section - September 15, 2008 DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 There is a critical need to upgrade the nation's electric transmission grid. Two reasons in particular drive this need. First, increasing transmission capability will help ensure a reliable electric supply and provide greater access to economically-priced power. Second, with the growth in state-adopted renewable performance standards (RPS) and the increasing possibility of a national RPS, significant new transmission, much of it interregional, is needed to access renewable resources. DOE EAC Electricity Adequacy Report. Transmission Section - September 15, 2008 More Documents & Publications DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

476

Idaho/Transmission/State Regulations | Open Energy Information  

Open Energy Info (EERE)

Idaho‎ | Transmission Idaho‎ | Transmission Jump to: navigation, search IdahoTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database State Siting Process The State's direct authority to site high-voltage transmission lines is limited to transmission lines located within National Interstate Electric Transmission Corridors (NIETC); however, no NIETCs currently exist within Idaho so the authority has not been put into practice. Siting authority belongs to local governments or federal agencies that manage the land where the proposed transmission line would be located. Public utilities that

477

2009 Electric Transmission Congestion Study | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9 Electric Transmission Congestion Study 9 Electric Transmission Congestion Study 2009 Electric Transmission Congestion Study The 2009 National Congestion Electric Transmission Study, required by section 216(a) of the Federal Power Act, examines transmission congestion constraints across the Nation and identifies areas that are transmission-constrained, but does not make recommendations concerning existing or new National Corridor designations. This is the second Congestion Study the Department has conducted, with the first issued in 2006. Public comments received after the release of the 2009 Congestion Study can be found here. National Electric Transmission Congestion Study 2009 Executive Summary Full Text of the National Electric Transmission Congestion Study 2009 More Documents & Publications

478

2009 National Electric Transmission Congestion Study - Atlanta Workshop |  

Broader source: Energy.gov (indexed) [DOE]

2009 National Electric Transmission Congestion Study - Atlanta 2009 National Electric Transmission Congestion Study - Atlanta Workshop 2009 National Electric Transmission Congestion Study - Atlanta Workshop On July 29, 2008, DOE hosted a regional pre-study workshop in Atlanta, GA to receive input and suggestions concerning the 2009 National Electric Transmission Congestion Study. The agenda and full transcript are available below. 7-29-08 Congestion Workshop Agenda - Atlanta, GA.pdf Transcript - 2009 National Electric Transmission Congestion Study Atlanta Workshop.pdf More Documents & Publications 2009 National Electric Transmission Congestion Study - San Francisco Workshop 2012 National Electric Transmission Congestion Study - St. Louis Workshop 2009 National Electric Transmission Congestion Study - Las Vegas Workshop

479

RAPID/BulkTransmission/General Construction | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionGeneral Construction < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit...

480

QER Public Meeting in New Orleans, LA: Petroleum Product Transmission...  

Energy Savers [EERE]

Orleans, LA: Petroleum Product Transmission & Distribution QER Public Meeting in New Orleans, LA: Petroleum Product Transmission & Distribution Meeting Date and Location: May 27,...

Note: This page contains sample records for the topic "ferry 115-kilovolt transmission" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

OAHU Wind Integration And Transmission Study: Summary Report...  

Office of Environmental Management (EM)

OAHU Wind Integration And Transmission Study: Summary Report, NREL (National Renewable Energy Laboratory) OAHU Wind Integration And Transmission Study: Summary Report, NREL...

482

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power...

483

In-situ Transmission Electron Microscopy and Spectroscopy Studies...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Electron Microscopy and Spectroscopy Studies of Interfaces in Li-ion Batteries: Challenges and In-situ Transmission Electron Microscopy and Spectroscopy Studies of...

484

QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution QER Public Meeting in Pittsburgh, PA: Natural Gas: Transmission, Storage and Distribution Meeting Date and...

485

RAPID/BulkTransmission/Land Access | Open Energy Information  

Open Energy Info (EERE)

Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Tools Contribute Contact Us RAPID Bulk Transmission Land Access Regulatory...

486

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

487

2006 National Electric Transmission Congestion Study and Related...  

Broader source: Energy.gov (indexed) [DOE]

6 National Electric Transmission Congestion Study and Related Materials 2006 National Electric Transmission Congestion Study and Related Materials The 2006 National Congestion...

488

Draft National Electric Transmission Congestion Study Now Available...  

Broader source: Energy.gov (indexed) [DOE]

Draft National Electric Transmission Congestion Study Now Available for Public Comment Draft National Electric Transmission Congestion Study Now Available for Public Comment August...

489

Plan to Conduct Electric Transmission Congestion Study: Federal...  

Broader source: Energy.gov (indexed) [DOE]

Plan to Conduct Electric Transmission Congestion Study: Federal Register Volume 76, No. 218 - Nov. 10, 2011 Plan to Conduct Electric Transmission Congestion Study: Federal Register...

490

RAPID/BulkTransmission/Siting/New Mexico | Open Energy Information  

Open Energy Info (EERE)

Solar Resources Contribute Contact Us RAPID Bulk Transmission Siting New Mexico Bulk Transmission Siting in New Mexico Regulatory Information Overviews Search for...

491

RAPID/BulkTransmission/Siting/California | Open Energy Information  

Open Energy Info (EERE)

Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Resources Contribute Contact Us RAPID Bulk Transmission Siting California Bulk...

492

Questions and Issues on Hydrogen Pipelines: Pipeline Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen Questions and Issues on Hydrogen Pipelines: Pipeline Transmission of Hydrogen Pipping of GH2 Pipeline....

493

RAPID/BulkTransmission/Air Quality | Open Energy Information  

Open Energy Info (EERE)

RAPIDBulkTransmissionAir Quality < RAPID | BulkTransmission Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About...

494

California/Transmission/Local Regulations | Open Energy Information  

Open Energy Info (EERE)

do not have siting authority for transmission facilities. Print PDF Retrieved from "http:en.openei.orgwindex.php?titleCaliforniaTransmissionLocalRegulations&oldid68832...

495

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy Savers [EERE]

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

496

RAPID/Overview/BulkTransmission/Siting/Colorado | Open Energy...  

Open Energy Info (EERE)

Colorado < RAPID | Overview | BulkTransmission | Siting(Redirected from RAPIDAtlasBulkTransmissionSitingColorado) Redirect page Jump to: navigation, search REDIRECT...

497

Transmission/Resource Library/Enviromental Resources and Mitigation...  

Open Energy Info (EERE)

Enviromental Resources and Mitigation < Transmission | Resource Library(Redirected from TransmissionResource LibraryMitigation) Redirect page Jump to: navigation, search...

498

Steps to Establish a Real-Time Transmission Monitoring System...  

Broader source: Energy.gov (indexed) [DOE]

that must be taken to establish a system to make available to all transmission owners and Regional Transmission Organizations (RTOs) within the Eastern and Western Interconnections...

499

QER Public Meeting in Portland, OR: Electricity Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Portland, OR: Electricity Transmission, Storage and Distribution - West QER Public Meeting in Portland, OR: Electricity Transmission, Storage and Distribution - West Meeting Date...

500

QER Public Meeting in Newark, NJ: Electricity Transmission and...  

Energy Savers [EERE]

Newark, NJ: Electricity Transmission and Distribution - East QER Public Meeting in Newark, NJ: Electricity Transmission and Distribution - East New Jersey Institute of Technology...