National Library of Energy BETA

Sample records for fees merchandise repairs

  1. Fees

    Broader source: Energy.gov [DOE]

    The DOE Loan Program is required to collect several fees from loan program Applicants. Please find an outline of these fees below. In addition, DOE is supported by outside consultants and legal...

  2. General Merchandise 50% Energy Savings Technical Support Document...

    Open Energy Info (EERE)

    Publication Year 2009 URL http:www.nrel.govdocsfy09osti46100.pdf Building Models General Merchandise 2009 TSD Chicago High Plug Load Baseline, General Merchandise 2009...

  3. Commercial Building Partnership General Merchandise Energy Savings Overview

    SciTech Connect (OSTI)

    2013-03-01

    The Commercial Building Partnership (CBP) paired selected commercial building owners and operators with representatives of DOE, national laboratories and private sector exports to explore energy efficiency measures across general merchandise commercial buildings.

  4. General Merchandise 50% Energy Savings Technical Support Document

    SciTech Connect (OSTI)

    Hale, E.; Leach, M.; Hirsch, A.; Torcellini, P.

    2009-09-01

    This report documents technical analysis for medium-box general merchandise stores aimed at providing design guidance that achieves whole-building energy savings of at least 50% over ASHRAE Standard 90.1-2004.

  5. Award Fee Determination Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 CH2M Hill Plateau Remediation Company Contract Number: DE-AC06-08RL14788 Final Fee Determination for Base funded Performance Measures Basis of Evaluation: Completion of Performance Measures contained in Section J, Attachment J.4, Performance Evaluation and Measurement Plan, according to the identified completion criteria. Evaluation Results: FY 2012 Base Period Fee Available Fee allocated to FY 2012* Performance Measures $10,399,033.60 Incremental Fee $4,490,000.00 Provisional Fee

  6. Award Fee Determination Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 CH2M Hill Plateau Remediation Company Contract Number: DE-AC06-08RL14788 Final Fee Determination for Base funded and American Recovery and Reinvestment Act (Recovery) funded Performance Measures Basis of Evaluation: Completion of Performance Measures contained in Section J, AttachmentJ.4, Performance Evaluation and Measurement Plan, according to the identified completion criteria. Evaluation Results: Fiscal Year 2011 (Oct 1, 2010 - Sept 30, 2011) Base Funded Fee Recovery Funded Fee Available

  7. AWARD FEE DETERMINATION SCORECARD Contractor: Restoration Services...

    Office of Environmental Management (EM)

    Basis of Evaluation: FY14 Award Fee Plan for Restoration Services, Inc.; Portsmouth Environmental Technical Services II Award Fee Available: 349,708.00 Award Fee Earned:...

  8. Fees | Open Energy Information

    Open Energy Info (EERE)

    stub. You can help OpenEI by expanding it. Retrieved from "http:en.openei.orgwindex.php?titleFees&oldid542709" Feedback Contact needs updating Image needs updating...

  9. EM Contractor Fee Payments

    Broader source: Energy.gov [DOE]

    In the interest of furthering transparency in its government operations, the Department of Energy’s Office of Environmental Management (EM) herein is releasing information relating to fee payments...

  10. FOIA FEES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEES FOIA FEES The FOIA generally requires that requestors pay fees for processing their requests. If costs associated with the processing of a FOIA request are $15.00 or less, no fees are charged. Each FOIA request is reviewed for the purpose of placing a requestor in one of the fee categories described in the document below. FOIA FEES (16.8 KB) More Documents & Publications How to Make a FOIA Request FIA-11-0018 - In the Matter of Robert M. Balick FIA-11-0018 - In the Matter of Robert M.

  11. Contractor Fee Payments- Small Sites

    Broader source: Energy.gov [DOE]

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Small Sites office on these charts.

  12. Microsoft Word - FY14 NWP Fee Scorecards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY14 Fee Determination Scorecard Contractor: Nuclear Waste Partnership, LLC Contract: DE-EM0001971 Award Period: October 1, 2013 through September 30, 2014 Basis of Evaluation: Performance and Evaluation Plan (PEMP) for FY2014 The FY2014 PEMP for this contract is available at: http://www.wipp.energy.gov/NWPpayments/NWP.htm Award Fee Scorecard: Subjective Fee (Award Fee) Criteria Summary Table Criteria Maximum Available Fee Adjectival Rating Fee Range Available for Adjectival Ratings Percentage

  13. Award Fee Determination Scorecard Contractor: Savannah River...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 - September 30, 2013 Basis of Evaluation: Performance and Evaluation Plan (PEMP) This is a Cost Plus Award Fee contract as defined by federal acquisition regulations (FAR). Fee ...

  14. Award Fee Determination Scorecard Contractor: Savannah River...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance and Evaluation Plan (PEMP) Award Fee: 3,370,000 Incentive Fee: ... each contract year is identified in the Performance Evaluation Measurement Plan (PEMP). ...

  15. Award Fee Determination Scorecard Contractor: Savannah River...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 - September 30, 2015 Basis of Evaluation: Performance and Evaluation Plan (PEMP) This is a Cost Plus Award Fee contract as defined by federal acquisition regulations (FAR). Fee ...

  16. CHPRC Fee Determination Summaries - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CHPRC Fee Determination Summaries DOE-RL Contracts/Procurements RL Contracts & Procurements Home Prime Contracts Current Solicitations Other Sources DOE RL Contracting Officers DOE RL Contracting Officer Representatives CHPRC Fee Determination Summaries Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size CHPRC Fiscal Year 2015 Fee Evaluation Summary CHPRC Fiscal Year 2014 Fee Evaluation Summary CHPRC Fiscal Year 2013 Fee Evaluation Summary CHPRC Fiscal Year 2012

  17. Turbine repair process, repaired coating, and repaired turbine component

    SciTech Connect (OSTI)

    Das, Rupak; Delvaux, John McConnell; Garcia-Crespo, Andres Jose

    2015-11-03

    A turbine repair process, a repaired coating, and a repaired turbine component are disclosed. The turbine repair process includes providing a turbine component having a higher-pressure region and a lower-pressure region, introducing particles into the higher-pressure region, and at least partially repairing an opening between the higher-pressure region and the lower-pressure region with at least one of the particles to form a repaired turbine component. The repaired coating includes a silicon material, a ceramic matrix composite material, and a repaired region having the silicon material deposited on and surrounded by the ceramic matrix composite material. The repaired turbine component a ceramic matrix composite layer and a repaired region having silicon material deposited on and surrounded by the ceramic matrix composite material.

  18. Contractor Fee Payments- Idaho Operations Office

    Office of Energy Efficiency and Renewable Energy (EERE)

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Idaho Operations Office on these charts.

  19. Contractor Fee Payments- Oak Ridge Operations

    Office of Energy Efficiency and Renewable Energy (EERE)

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Oak Ridge Operations on these charts.  

  20. Contractor Fee Payments- Richland Operations Office

    Office of Energy Efficiency and Renewable Energy (EERE)

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Richland Operations Office on these charts. 

  1. Contractor Fee Payments- Office of River Protection

    Office of Energy Efficiency and Renewable Energy (EERE)

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Office of River Protection on these charts.

  2. Contractor Fee Payments- Carlsbad Field Office

    Office of Energy Efficiency and Renewable Energy (EERE)

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Carlsbad Field Office on these charts.

  3. Contractor Fee Payments- Savannah River Operations Office

    Broader source: Energy.gov [DOE]

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts. 

  4. Contractor Fee Payments- Portsmouth Paducah Project Office

    Office of Energy Efficiency and Renewable Energy (EERE)

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the  Portsmouth Paducah Project Office on these charts.

  5. RL's Fiscal Year 2013 Fee Evaluation Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RL's Fiscal Year 2013 Fee Evaluation Summary Contractor: HPM Corporation (HPMC) Contract: Occupational Medical Services at DOE Hanford Contract Number: DE-EM0002043 Award Period: October 2012 through September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $300,000.00 Award Fee Earned: $284,250.00 Award Fee Area Adjectival Ratings: Performance Incentive Adjectival Rating Allocated Percent Earned Percent Amount Available Amount Earned 1.0: Worker

  6. RL's Fiscal Year 2013 Fee Evaluation Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RL's Fiscal Year 2013 Fee Evaluation Summary Contractor: Mission Support Alliance, LLC (MSA) Contract: Mission Support Contract Contract Number: DE-AC06-09RL14728 Award Period: October 2012 through September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $21,030,647 Award Fee Earned: $19,352,402 (92%) Award Fee Area Adjectival Ratings: Objective: Excellent (96%) $12,117,859 Subjective: Very Good (86%) $7,234,543 The contractor met or exceeded

  7. Performance Period Total Fee Paid FY2008

    Office of Environmental Management (EM)

    1,339,286 FY 2012 38,126 FY 2013 42,265 Cumulative Fee Paid 1,766,600 42,265 Cost Plus Incentive FeeCost Plus Fixed Fee 36,602,425 Contract Period: September 2007 -...

  8. Strategies to Save 50% Site Energy in Grocery and General Merchandise Stores

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategies to Save 50% Site Energy in Grocery and General Merchandise Stores Adam Hirsch, Elaine Hale, and Matthew Leach Presented at the ACEEE Summer Study 2010 Pacific Grove, California August 15-20, 2010 Conference Paper NREL/CP-5500-48197 March 2011 NOTICE The submitted manuscript has been offered by an employee of the Alliance for Sustainable Energy, LLC (Alliance), a contractor of the US Government under Contract No. DE-AC36-08GO28308. Accordingly, the US Government and Alliance retain a

  9. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Nancy Porter; Mike Sullivan; Chris Neary

    2003-05-01

    The two broad categories of deposited weld metal repair and fiber-reinforced composite repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repairs and for fiber-reinforced composite repair. To date, all of the experimental work pertaining to the evaluation of potential repair methods has focused on fiber-reinforced composite repairs. Hydrostatic testing was also conducted on four pipeline sections with simulated corrosion damage: two with composite liners and two without.

  10. Title 43 CFR 3000.12 What is the Fee Schedule for Fixed Fees...

    Open Energy Info (EERE)

    000.12 What is the Fee Schedule for Fixed Fees? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  11. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment and Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: January 1, 2015, to December 31, 2015 Basis of Evaluation: 2015 Performance Evaluation and Measurement Plan Award Fee Available: $12,600,000 Award Fee Earned: $8,310,000 (66.0* percent) Incentive B.1 - Award Fee-Project Management - Good The fee for Project

  12. Department of Environmental Conservation Stormwater Program Fee...

    Open Energy Info (EERE)

    PermittingRegulatory Guidance - Supplemental Material: Department of Environmental Conservation Stormwater Program Fee SummaryPermittingRegulatory GuidanceSupplemental Material...

  13. DOE - NNSA/NFO -- Nuclear Testing Archive Fee Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Testing Archive > Fee Schedule NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Nuclear Testing Archive (NTA) Fee Schedule The U.S. Department of Energy ...

  14. PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    performance validation; performance reporting; and payment of fees related to PBIs. ... Validation is accomplished before payment of earned fee can be made. Validation of ...

  15. Rapid road repair vehicle

    DOE Patents [OSTI]

    Mara, L.M.

    1998-05-05

    Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find at the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was not heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past. 2 figs.

  16. Rapid road repair vehicle

    DOE Patents [OSTI]

    Mara, Leo M.

    1998-01-01

    Disclosed is a rapid road repair vehicle capable of moving over a surface to be repaired at near normal posted traffic speeds to scan for and find an the high rate of speed, imperfections in the pavement surface, prepare the surface imperfection for repair by air pressure and vacuum cleaning, applying a correct amount of the correct patching material to effect the repair, smooth the resulting repaired surface, and catalog the location and quality of the repairs for maintenance records of the road surface. The rapid road repair vehicle can repair surface imperfections at lower cost, improved quality, at a higher rate of speed than was was heretofor possible, with significantly reduced exposure to safety and health hazards associated with this kind of road repair activities in the past.

  17. Performance Period Total Fee Paid FY2001

    Office of Environmental Management (EM)

    17,590,414 FY2011 17,558,710 FY2012 14,528,770 Cumulative Fee Paid 126,281,339 Cost Plus Award Fee DE-AC29-01AL66444 Washington TRU Solutions LLC Contractor: Contract Number:...

  18. Alternative Fuels Data Center: State Fees as Transportation Funding

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Alternatives Fees as Transportation Funding Alternatives to someone by E-mail Share Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Facebook Tweet about Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Twitter Bookmark Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Google Bookmark Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Delicious Rank

  19. Release of Department of Energy Award Fee and Incentive Fee Reports

    Broader source: Energy.gov [DOE]

    To provide a consistent Department of Energy approach on the disclosure of award fee and incentive fee reports (fee determination reports) for management and operating contracts and other major contracts at the Department’s sites, the Department will, in the near future, be implementing the following policy: programs shall, at a minimum, publish a one-page score card for each contractor summarizing the fee determination and release the fee determination report upon request. However, programs will only release the fee determination report to the public after appropriate redactions are made. The Department’s Senior Procurement Executives, in consultation with the Heads of Contracting Activities and the Office of General Counsel, intend to develop and issue the policy shortly.

  20. fees

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOEIG-0427 SEPTEMBER 1998 September 11, 1998 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Acting Inspector General SUBJECT: INFORMATION : Audit Report on "The U.S. ...

  1. Sacramento Ordinance to Waive Solar PV Fees

    Broader source: Energy.gov [DOE]

    This is an ordinance by the city of Sacramento to suspend for the calendar years 2007-2009 all fees related to installation of photovoltaic systems on existing residences.

  2. FY 14 Award Fee Determination Scorecard

    Office of Environmental Management (EM)

    14 Award Fee Determination Scorecard Contractor: Swift and Staley Inc. (SST) Contract: DE-AC30-10CC40021 Award Period: October 1,2013 - September 30,2014 Basis of Evaluation: FY 14 ...

  3. WAI Contract & Fee Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    It is contract DE-EM0000323, and it includes all sections through MOD80. PDF icon WAI Contract (DE-EM0000323) PDF icon Fee determination letter (Oct. 2014) More Documents & ...

  4. CONCUR: AWARD FEE PLAN - FY15

    Office of Environmental Management (EM)

    as Facility Support Services Contract Award Fee Plan Contract Number DE-CI0000004 3 editorial or personnel changes may be made and implemented without being provided to the...

  5. Repair of hydroprocessing reactors

    SciTech Connect (OSTI)

    Niccolls, E.H.; Imgram, A.G.; Bagdasarian, A.J.

    1995-12-01

    In this paper the authors very briefly review the types of damage observed and repairs performed in hydroprocessing reactors. The authors will summarize the fundamental damage mechanisms, and where in the reactors they have needed to make repairs over the years. The era from the 1960`s through about 1990 will be briefly discussed. They describe in more detail repairs undertaken in the 1990`s. Finally, they will note important technical issues their industry faces regarding repairs, and the long term reliable operation of these vessels.

  6. Service and Repair Work

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    service and repair work Service and Repair Work Whenever on-site service or repair work needs to be done, a Procurement Work Sheet (PWS) must be completed, and possibly an IWS, authorized and released. PWS is required for service work even if there are no apparent hazards. PWS is required for work in Jupiter Laser Facility even if you have a PWS for service/repairs in another location. To complete a PWS for service work in Jupiter Laser Facility, please contact Sean Holte (2-3905, pager #05312).

  7. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment & Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: January 1, 2014 to June 30, 2014 Basis of Evaluation: 2014-A Performance Evaluation and Measurement Plan Award Fee Available: $6,300,000 Award Fee Earned: $3,970,000 (63.0%) Incentive B.1 - Award Fee-Project Management The fee for Project Management is divided into three Award Fee Objectives

  8. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment & Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: July 1, 2014 to December 31, 2014 Basis of Evaluation: 2014-B Performance Evaluation and Measurement Plan Award Fee Available: $6,300,000 Award Fee Earned: $4,095,000 (65.0%) Incentive B.1 - Award Fee-Project Management - Good The fee for Project Management

  9. Award Fee Determination Scorecard Contractor: Washington River Protection Solutions, LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract: Tank Operations Contract Contract Number: DE-AC27-08RV14800 Award Fee Period: October 1, 2013 to September 30, 2014 Basis of Evaluation: FY 2014 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available: $12,597,052 Award Fee Earned: $10,459,418 (83.0%) Award Fee Area Adjectival Ratings for each Award Fee Special Emphasis Area (SEA): Functional Element Adjectival Rating* SEA 1: Management of Single-Shell (SST) and Double-Shell Tank (DST) System Excellent SEA 2:

  10. Award Fee Determination Scorecard Contractor: Washington River Protection Solutions, LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Washington River Protection Solutions, LLC Contract: Tank Operations Contract Contract Number: DE-AC27-08RV14800 Award Fee Period: October 1, 2014 to September 30, 2015 Basis of Evaluation: FY 2015 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available: $15,600,000 Award Fee Earned: $13,728,000 (88%) Award Fee Area Adjectival Ratings for each Award Fee Special Emphasis Area (SEA): Functional Element Adjectival Rating* SEA 1: Management of Single-Shell (SST) and Double-Shell

  11. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Bill Bruce; Nancy Porter; George Ritter; Matt Boring; Mark Lozev; Ian Harris; Bill Mohr; Dennis Harwig; Robin Gordon; Chris Neary; Mike Sullivan

    2005-07-20

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without

  12. Title 11 Alaska Administrative Code Chapter 5 Fees | Open Energy...

    Open Energy Info (EERE)

    5 Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 11 Alaska Administrative Code Chapter 5 FeesLegal Abstract...

  13. Section L Attachment I - Summary and Fee Sheet Amendment 000002...

    National Nuclear Security Administration (NNSA)

    I Summary and Fee Sheet Amendment 000002 Nevada National Security Site Management and Operating (M&O) Contract PROPOSED 2017 Mgt Team Costs 2018 Mgt Team Costs Subtotal 0 FEE CLIN ...

  14. Alaska Division of Water Permit Fees | Open Energy Information

    Open Energy Info (EERE)

    Water Permit Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Alaska Division of Water Permit Fees Author Alaska Division of Water Published...

  15. Contractor Fee Payments - Savannah River Site Office | Department...

    Broader source: Energy.gov (indexed) [DOE]

    the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts. Liquid Waste...

  16. Utah Water Rights Fee Schedule | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah Water Rights Fee Schedule Abstract Water rights fee schedule based on amount appropriated....

  17. Title 18 CFR 381 Fees | Open Energy Information

    Open Energy Info (EERE)

    Regulation: Title 18 CFR 381 FeesLegal Abstract Part 381 Fees, Forms under Title 18: Conservation of Power and Water Resources of the U.S. Code of Federal Regulations, current...

  18. ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE | Department...

    Broader source: Energy.gov (indexed) [DOE]

    on provisional payment of fee for non management and operating contracts. PF2014-08 Acquisition Letter 2014-02 Provisional Payment of FeeAcquisition Letter 2014-02 Provisional ...

  19. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-12-31

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without

  20. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-08-17

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Principal conclusions from a survey of natural gas transmission industry pipeline operators can be summarized in terms of the following performance requirements for internal repair: (1) Use of internal repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling when a new bore must be created to solve a leak or other problem. (3) Typical travel distances can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). All three groups require pig-based systems. A despooled umbilical system would suffice for the first two groups which represents 81% of survey respondents. The third group would require an onboard self-contained power unit for propulsion and welding/liner repair energy needs. (4) The most common size range for 80% to 90% of operators surveyed is 508 mm (20 in.) to 762 mm (30 in.), with 95% using 558.8 mm (22 in.) pipe. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners

  1. EUVL Mask Blank Repair

    SciTech Connect (OSTI)

    Barty, A; Mirkarimi, P; Stearns, D G; Sweeney, D; Chapman, H N; Clift, M; Hector, S; Yi, M

    2002-05-22

    EUV mask blanks are fabricated by depositing a reflective Mo/Si multilayer film onto super-polished substrates. Small defects in this thin film coating can significantly alter the reflected field and introduce defects in the printed image. Ideally one would want to produce defect-free mask blanks; however, this may be very difficult to achieve in practice. One practical way to increase the yield of mask blanks is to effectively repair multilayer defects, and to this effect they present two complementary defect repair strategies for use on multilayer-coated EUVL mask blanks. A defect is any area on the mask which causes unwanted variations in EUV dose in the aerial image obtained in a printing tool, and defect repair is correspondingly defined as any strategy that renders a defect unprintable during exposure. The term defect mitigation can be adopted to describe any strategy which renders a critical defect non-critical when printed, and in this regard a non-critical defect is one that does not adversely affect device function. Defects in the patterned absorber layer consist of regions where metal, typically chrome, is unintentionally added or removed from the pattern leading to errors in the reflected field. There currently exists a mature technology based on ion beam milling and ion beam assisted deposition for repairing defects in the absorber layer of transmission lithography masks, and it is reasonable to expect that this technology will be extended to the repair of absorber defects in EUVL masks. However, techniques designed for the repair of absorber layers can not be directly applied to the repair of defects in the mask blank, and in particular the multilayer film. In this paper they present for the first time a new technique for the repair of amplitude defects as well as recent results on the repair of phase defects.

  2. Rapid road repair vehicle

    DOE Patents [OSTI]

    Mara, Leo M.

    1999-01-01

    Disclosed are improvments to a rapid road repair vehicle comprising an improved cleaning device arrangement, two dispensing arrays for filling defects more rapidly and efficiently, an array of pre-heaters to heat the road way surface in order to help the repair material better bond to the repaired surface, a means for detecting, measuring, and computing the number, location and volume of each of the detected surface imperfection, and a computer means schema for controlling the operation of the plurality of vehicle subsystems. The improved vehicle is, therefore, better able to perform its intended function of filling surface imperfections while moving over those surfaces at near normal traffic speeds.

  3. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    Performance Period Total Fee Paid FY2008 $134,832 FY2009 $142,578 FY2010 $299,878 FY2011 $169,878 Cumulative Fee Paid $747,166 Contract Period: September 2007 - October 2012 $31,885,815 C/P/E Environmental Services, LLC DE-AM09-05SR22405/DE-AT30-07CC60011/SL14 Contractor: Contract Number: Contract Type: Cost Plus Award Fee $357,223 $597,797 $894,699 EM Contractor Fee Site: Stanford Linear Accelerator Center (SLAC) Contract Name: SLAC Environmental Remediation December 2012 $1,516,646 Fee

  4. INTERNAL REPAIR OF PIPELINES

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; Nancy Porter; Mike Sullivan; Chris Neary

    2004-04-12

    The two broad categories of deposited weld metal repair and fiber-reinforced composite liner repair technologies were reviewed for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Preliminary test programs were developed for both deposited weld metal repair and for fiber-reinforced composite liner repair. Evaluation trials have been conducted using a modified fiber-reinforced composite liner provided by RolaTube and pipe sections without liners. All pipe section specimens failed in areas of simulated damage. Pipe sections containing fiber-reinforced composite liners failed at pressures marginally greater than the pipe sections without liners. The next step is to evaluate a liner material with a modulus of elasticity approximately 95% of the modulus of elasticity for steel. Preliminary welding parameters were developed for deposited weld metal repair in preparation of the receipt of Pacific Gas & Electric's internal pipeline welding repair system (that was designed specifically for 559 mm (22 in.) diameter pipe) and the receipt of 559 mm (22 in.) pipe sections from Panhandle Eastern. The next steps are to transfer welding parameters to the PG&E system and to pressure test repaired pipe sections to failure. A survey of pipeline operators was conducted to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. Completed surveys contained the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water, in difficult soil conditions, under highways, under congested intersections, and under railway crossings. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to

  5. Microsoft Word - DRAFT FY15 Award Fee Plan LATA - 09-19-2014...

    Office of Environmental Management (EM)

    Remediation Contract Award Fee Plan Contract Number: DE-AC30-10CC40020 AWARD FEE PLAN FOR LATA ... (if applicable), (b) one-page scorecard, (c) Award Fee Determination Letter, ...

  6. UCOR Contract & Fee Determination | Department of Energy

    Energy Savers [EERE]

    UCOR Contract & Fee Determination UCOR Contract & Fee Determination The attached document is UCOR's conformed contract with the Oak Ridge Office of Environmental Managment. It is contract DE-SC0004645, and it includes all sections through MOD94. UCOR contract (DE-SC0004645) (4 MB) UCOR fee determination letter (July 2016) (571.83 KB) More Documents & Publications PPPO Contract Awards Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and

  7. Unique Fee-for-Service Revenues | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unique Fee-for-Service Revenues Unique Fee-for-Service Revenues Better Buildings Neighborhood Program Peer Exchange Calls on Program Sustainability: Unique Fee-for-Service Revenues, Call Slides and Discussion Summary, April 11, 2013. Call Slides and Discussion Summary (901.83 KB) More Documents & Publications Programs: Operating as a Prime Contractor Administering Nonprofit Energy Efficiency Programs Assessing Revenue Streams: What Is Right for Your Program?

  8. Aircraft Propeller Hub Repair

    SciTech Connect (OSTI)

    Muth, Thomas R.; Peter, William H.

    2015-02-13

    The team performed a literature review, conducted residual stress measurements, performed failure analysis, and demonstrated a solid state additive manufacturing repair technique on samples removed from a scrapped propeller hub. The team evaluated multiple options for hub repair that included existing metal buildup technologies that the Federal Aviation Administration (FAA) has already embraced, such as cold spray, high velocity oxy-fuel deposition (HVOF), and plasma spray. In addition the team helped Piedmont Propulsion Systems, LLC (PPS) evaluate three potential solutions that could be deployed at different stages in the life cycle of aluminum alloy hubs, in addition to the conventional spray coating method for repair. For new hubs, a machining practice to prevent fretting with the steel drive shaft was recommended. For hubs that were refurbished with some material remaining above the minimal material condition (MMC), a silver interface applied by an electromagnetic pulse additive manufacturing method was recommended. For hubs that were at or below the MMC, a solid state additive manufacturing technique using ultrasonic welding (UW) of thin layers of 7075 aluminum to the hub interface was recommended. A cladding demonstration using the UW technique achieved mechanical bonding of the layers showing promise as a viable repair method.

  9. Gordon Fee, part 1 | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blake Case Larry Case Patrick Case Dorothy Coker Gordon Fee Linda Fellers Louis Freels Marie Guy Nathan Henry Agnes Houser John Rice Irwin Harvey Kite Charlie Manning Alice...

  10. Gordon Fee, part 2 | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blake Case Larry Case Patrick Case Dorothy Coker Gordon Fee Linda Fellers Louis Freels Marie Guy Nathan Henry Agnes Houser John Rice Irwin Harvey Kite Charlie Manning Alice...

  11. Wetland Permit Application Fees 2015 | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Wetland Permit Application Fees 2015PermittingRegulatory GuidanceGuide...

  12. Sacramento Ordinance to Waive Fees for Solar Hot Water

    Broader source: Energy.gov [DOE]

    An ordinance suspending for the calendar years 2007-2009 all fees related to installations of solar water heaters on existing residences.

  13. Oregon Fees for Underground Injection Control Program Fact Sheet...

    Open Energy Info (EERE)

    Fees for Underground Injection Control Program Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material:...

  14. FY 2007 Fee Adequacy, Pub 2008 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the fee will provide sufficient revenues to offset the commercial utilities' share of the total life cycle costs of the Civilian Radioactive Waste Management Program (the Program). ...

  15. Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Centerra-Savannah River Site Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2015 - March 31, 2016 Basis of Evaluation: Award Fee Plan Award Fee Available: $2,962,624.50 Award Fee Earned: $2,814,493.20 Award Fee Area Adjectival Ratings: Protective Force Operations and Training (45% of total available) The Contractor shall provide a well-trained, highly motivated Protective Force (PF) capable of reliably executing routine and emergency

  16. Microsoft Word - Award Fee Determination Scorecard for FY 2013...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Area Adjectival Ratings: Functional Element Adjectival Rating* Conduct of ... Program Compliance Very Good Nuclear Safety Very Good Environmental Regulatory ...

  17. Microsoft Word - FPDP Award Fee Plan 2015-2016 Rev 4 (Final)...

    Office of Environmental Management (EM)

    CONCUR: Reinhard Knerr AWARD FEE PLAN for Fluor Federal Services, Inc. Paducah ... period for the determination of earned fee is the Task Order period of performance. d. ...

  18. Award\tFee\tDetermination\tScorecard Contractor: Savannah River...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance and Evaluation Plan (PEMP) Award Fee: 3,000,000.00 Incentive Fee: ... each contract year is identified in the Performance Evaluation Measurement Plan (PEMP). ...

  19. Fee Determinations: Requirement to Obtain Acquisition Executive's Input

    Broader source: Energy.gov [DOE]

    On January 28, 2013, the Deputy Secretary issued the attached memorandum to the Department's senior officials requiring any Fee Determining Official whose contract falls under the cognizance of an Acquisition Executive to brief and obtain the input of that Acquisition Executive before determining earned fee under the contract.

  20. WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE DOE F 4220.23 (06-95) U.S. DEPARTMENT OF ENERGY 1. CONTRACTOR IDENTIFICATION 2. TYPE OF ACQUISTION ACTION (REFER TO OFPP MANUAL, FEDERAL PROCUREMENT DATA SYSTEMS - PRODUCT AND SERVICE CODES. APRIL 1980) a. Name c. Street address b. Division (If any) d. City e. State f. Zip code a. SUPPLIES & EQUIPMENT b. RESEARCH & DEVELOPMENT c. SERVICES: (1) ARCHITECT-ENGINEER: (2) MANAGEMENT SERVICES: (3) MEDICAL: (4) OTHER (e.g., SUPPORT SERVICES) 3.

  1. Fiscal year 1999 Battelle performance evaluation and fee agreement

    SciTech Connect (OSTI)

    DAVIS, T.L.

    1998-10-22

    Fiscal Year 1999 represents the third fill year utilizing a results-oriented, performance-based evaluation for the Contractor's operations and management of the DOE Pacific Northwest National Laboratory (here after referred to as the Laboratory). However, this is the first year that the Contractor's fee is totally performance-based utilizing the same Critical Outcomes. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractor's performance for the period October 1, 1998 through September 30, 1999, as required by Clauses entitled ''Use of Objective Standards of Performance, Self Assessment and Performance Evaluation'' and ''Performance Measures Review'' of the Contract DE-ACO6-76RL01830. Furthermore, it documents the distribution of the total available performance-based fee and the methodology set for determining the amount of fee earned by the Contractor as stipulated within the causes entitled ''Estimated Cost and Annual Fee,'' ''Total Available Fee'' and ''Allowable Costs and Fee.'' In partnership with the Contractor and other key customers, the Department of Energy (DOE) Headquarters (HQ) and Richland Operations Office (RL) has defined four critical outcomes that serve as the core for the Contractor's performance-based evaluation and fee determination. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory.

  2. FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor...

    Office of Environmental Management (EM)

    FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor: LATA Environmental Services of Kentucky, LLC Contract No.: DE-AC30-10CC40020 Award Period: October 1, 2013 through ...

  3. Award Fee Evaluation Period 5 Determination Scorecard Contractor...

    Office of Environmental Management (EM)

    5 Determination Scorecard Contractor: Fluor-BWXT Portsmouth LLC Contract: DE-AC30-10CC40017 Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September 30, 2015) ...

  4. Award Fee Evaluation Period 6 Determination Scorecard Contractor...

    Office of Environmental Management (EM)

    6 Determination Scorecard Contractor: Wastren-EnergX Mission Support, LLC Contract: DE-CI0000004 Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September 30, ...

  5. Fact #901: November 30, 2015 States Assessing Fees on Electric...

    Broader source: Energy.gov (indexed) [DOE]

    PEV Idaho 150 PEV Idaho 100 HEV North Carolina 100 EV Washington 100 EV ... all PEVs that can travel 30 miles using only battery power have an additional 50 fee. ...

  6. Idaho Water Right Applications, Forms, and Fees Webpage | Open...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho Water Right Applications, Forms, and Fees Webpage Abstract This webpage provides an overview...

  7. Spent fuel management fee methodology and computer code user's manual.

    SciTech Connect (OSTI)

    Engel, R.L.; White, M.K.

    1982-01-01

    The methodology and computer model described here were developed to analyze the cash flows for the federal government taking title to and managing spent nuclear fuel. The methodology has been used by the US Department of Energy (DOE) to estimate the spent fuel disposal fee that will provide full cost recovery. Although the methodology was designed to analyze interim storage followed by spent fuel disposal, it could be used to calculate a fee for reprocessing spent fuel and disposing of the waste. The methodology consists of two phases. The first phase estimates government expenditures for spent fuel management. The second phase determines the fees that will result in revenues such that the government attains full cost recovery assuming various revenue collection philosophies. These two phases are discussed in detail in subsequent sections of this report. Each of the two phases constitute a computer module, called SPADE (SPent fuel Analysis and Disposal Economics) and FEAN (FEe ANalysis), respectively.

  8. Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2014 - September 30, 2015 Basis of Evaluation: Award Fee Plan The contractor is required to provide, operate and maintain an armed and uniformed protective force for the physical protection of United States Department of Energy (DOE) security interests and other such related duties at the Savannah River Site (SRS). The

  9. Logistics & Fees - Combustion Energy Frontier Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Logistics & Fees Logistics & Fees Location/Accommodations The Summer School will be held on the beautiful campus of Princeton University. On-campus lodging in single-person, air-conditioned dormitory rooms with same-gender shared bath facilities is available to all participants(1). Breakfast, lunch and dinner meal plans are available to all participants. Participants may also choose to make arrangements to stay and dine at area hotels and restaurants. (1) Summer school dormitory

  10. Inspect and Repair Steam Traps

    SciTech Connect (OSTI)

    Not Available

    2006-01-01

    This revised ITP tip sheet on inspecting and repairing steam traps provide how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  11. Motor Repair Tech Brief | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Repair Tech Brief Motor Repair Tech Brief This Tech Brief answers: Why do motors fail? When should you repair instead of replace? And how can reliability and efficiency be assured in a repair? Motor Repair Tech Brief (March 2000) (941.96 KB) More Documents & Publications Extend the Operating Life of Your Motor Service Center Evaluation Guide Premium Efficiency Motor Selection and Application Guide - A Handbook for Industry

  12. Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination...

    Office of Environmental Management (EM)

    DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015 Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September ...

  13. Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of the adequacy of the fee being paid by nuclear power utilities...

  14. Waste Isolation Pilot Plant Contractor Receives 86 Percent of Available Fee

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Plant Contractor Receives 86 Percent of Available Fee Waste Isolation Pilot Plant Contractor Receives 86 Percent of Available Fee April 27, 2016 - 12:20pm Addthis Nuclear Waste Partnership received about 86 percent of the available fee for the performance period as the Waste Isolation Pilot Plant management and operations contractor. Nuclear Waste Partnership received about 86 percent of the available fee for the performance period as the Waste Isolation Pilot Plant

  15. Selected Bibliography on Electric Motor Repair | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Selected Bibliography on Electric Motor Repair Selected Bibliography on Electric Motor Repair The following series of repair documents related to electric motors were produced by...

  16. Privacy Act Fees and Time Limits | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    | (NNSA) Fees and Time Limits The Act provides agencies to assess fees only for the cost of reproducing records. However, it is the policy of the DOE to provide an individual with one copy of his or her requested records free of charge. The Act does not stipulate a time frame for an agency to provide access to individual records; however, the DOE's regulation (10 CFR, Part 1008.7(b)) states "Every effort will be made to respond within ten working days of the date of receipt by the

  17. Award Fee Determination Scorecard Contractor: Advanced Technologies and Laboratories (ATL) International Inc.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Advanced Technologies and Laboratories (ATL) International Inc. Contract: Laboratory Analytical Services and Testing Contract Contract Number: DE-AC27-10RV15051 Award Fee Period: January 1, 2015 to November 21, 2015 Basis of Evaluation: January 1, 2015 to November 21, 2015 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available (PBI and SEA): $789,765.60 Award Fee Earned (PBI and SEA): $781,078.18 (98.9%) Award Fee Area Adjectival Ratings for each Performance Based Incentives

  18. Award Fee Determination Shows Performance Improvement in WTP Contractor

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM Office of River Protection (ORP) Waste Treatment and Immobilization Plant (WTP) contractor Bechtel National Inc. improved its performance slightly in calendar year 2015 compared to the last half of 2014, earning 66 percent of its possible award fee, or $8.31 million out of a possible $12.6 million.

  19. Office of Inspector General audit report on Westinghouse Savannah River Company`s withdrawal of fees

    SciTech Connect (OSTI)

    1999-04-01

    As the operator of the Department`s Savannah River Site, Westinghouse Savannah River Company (Westinghouse) receives three types of fees: (1) award fees commensurate with the overall performance rating, (2) Performance Based Incentive (PBI) fees for achieving measurable goals or defined tasks as specified in annual operating plans, and (3) Cost Reduction Incentive Program (CRIP) fees for making improvements in site operations that reduce total contract costs. The Department`s Contracting Officer notifies Westinghouse when fees are earned, and Westinghouse withdraws the authorized amounts from the Department`s letter-of-credit account. The audit objective was to determine whether Westinghouse withdrew the appropriate amount of fees from the letter-of-credit account in Fiscal Years (FY) 1997 an 1998.

  20. DOE Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee

    Broader source: Energy.gov [DOE]

    As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee.

  1. Award\tFee\tDetermination\tScorecard Contractor: Savannah River...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2013 - September 30, 2014 Basis of Evaluation: Performance and Evaluation Plan (PEMP) This is a Cost Plus Award Fee contract as defined by federal acquisition regulations (FAR). ...

  2. Haier Repair Confusion Resolved | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Haier Repair Confusion Resolved Haier Repair Confusion Resolved April 26, 2010 - 12:28pm Addthis On January 7, 2010, DOE entered into a Consent Decree with Haier America regarding a problem with four models of Haier freezers that resulted in those freezers not achieving their advertised energy efficiency. DOE recently became aware that some consumers eligible for repairs were incorrectly told that they were not eligible. Haier has resolved the problem, and consumers are encouraged to contact

  3. Distribution System Audits, Leak Detection, and Repair: Kirtland Air Force Base Leak Detection and Repair Program

    SciTech Connect (OSTI)

    2009-01-14

    Water Best Management Practice #3 Fact Seet: Outlines how a leak detection and repair program helped Kirtland Air Force Base perform distribution system audits, leak detection, and repair to conserve water site-wide.

  4. Fact #901: November 30, 2015 States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue- Dataset

    Broader source: Energy.gov [DOE]

    Excel file and dataset for States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue

  5. INTERNAL REPAIR OF PIPELINES REVIEW & EVALUATION OF INTERNAL PIPELINE REPAIR TRIALS REPORT

    SciTech Connect (OSTI)

    Robin Gordon; Bill Bruce; Ian Harris; Dennis Harwig; George Ritter; Bill Mohr; Matt Boring; Nancy Porter; Mike Sullivan; Chris Neary

    2004-09-01

    The two broad categories of fiber-reinforced composite liner repair and deposited weld metal repair technologies were reviewed and evaluated for potential application for internal repair of gas transmission pipelines. Both are used to some extent for other applications and could be further developed for internal, local, structural repair of gas transmission pipelines. Evaluation trials were conducted on pipe sections with simulated corrosion damage repaired with glass fiber-reinforced composite liners, carbon fiber-reinforced composite liners, and weld deposition. Additional un-repaired pipe sections were evaluated in the virgin condition and with simulated damage. Hydrostatic failure pressures for pipe sections repaired with glass fiber-reinforced composite liner were only marginally greater than that of pipe sections without liners, indicating that this type of liner is generally ineffective at restoring the pressure containing capabilities of pipelines. Failure pressure for pipe repaired with carbon fiber-reinforced composite liner was greater than that of the un-repaired pipe section with damage, indicating that this type of liner is effective at restoring the pressure containing capability of pipe. Pipe repaired with weld deposition failed at pressures lower than that of un-repaired pipe in both the virgin and damaged conditions, indicating that this repair technology is less effective at restoring the pressure containing capability of pipe than a carbon fiber-reinforced liner repair. Physical testing indicates that carbon fiber-reinforced liner repair is the most promising technology evaluated to-date. Development of a comprehensive test plan for this process is recommended for use in the next phase of this project.

  6. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. |...

  7. Solar Water Heating System Maintenance and Repair | Department...

    Energy Savers [EERE]

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | ...

  8. Leveraging Service Calls and Emergency Repairs for Energy Efficiency...

    Energy Savers [EERE]

    Service Calls and Emergency Repairs for Energy Efficiency Marketing Leveraging Service Calls and Emergency Repairs for Energy Efficiency Marketing Better Buildings Residential ...

  9. Developments advance subsea pipelaying, inspection, repair

    SciTech Connect (OSTI)

    1997-09-15

    Recent advances in laying, inspecting, and repairing pipelines are helping to cut both costs and time. A new dredging system that employs jets to clear a subsea trench for pipelay received trials off Belgium last spring. Also, within the last year, projects in the Middle East and North Sea employed technologies that promise to make inspecting the surface of a subsea pipeline in difficult terrain easier, less time consuming, and therefore less costly. Plus, subsea repair of damaged pipelines may take less time with a new ``stabbable`` pipe connector. The paper describes jet dredging, inspection advance, support software, the North Sea site, and pipeline repair.

  10. A Guide to AC Motor Repair and Replacement

    SciTech Connect (OSTI)

    2004-03-01

    This booklet provides helpful information for making informed repair or replace decisions for electric motors.

  11. EM's Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee EM's Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee July 28, 2016 - 12:45pm Addthis UCOR’s K-27 Building demolition project, pictured here, is ahead of schedule with actual costs projected to be less than planned, according to OREM’s correspondence regarding the contractor’s fee determination. UCOR's K-27 Building demolition project, pictured here, is ahead of schedule with

  12. Electronic Fabrication & Repair | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electronic Fabrication & Repair The Electronics group provides custom design and fabrication of electronic equipment.. We convert ideas into custom-finished equipment in our shop using ORCAD Schematic Capture and PCB Layout software in conjunction with our PCB machine to make prototype circuit boards in-house. Our technicians also aid in automating and controlling research project instrumentation using Texas Instruments LabView. We repair all kinds of scientific and laboratory electronic and

  13. Model Repair Specifications for Low Voltage Induction Motors | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Repair Specifications for Low Voltage Induction Motors Model Repair Specifications for Low Voltage Induction Motors These Model Repair Specifications are intended to cover routine repair and rewind of low-voltage random-wound three-phase AC squirrel cage induction motors. Model Repair Specifications for Low Voltage Induction Motors (November 1999) (1.31 MB) More Documents & Publications DOE Navigant Master Presentation Improving Motor and Drive System Performance - A Sourcebook

  14. Energy and Technology Review: Unlocking the mysteries of DNA repair

    SciTech Connect (OSTI)

    Quirk, W.A.

    1993-04-01

    DNA, the genetic blueprint, has the remarkable property of encoding its own repair following diverse types of structural damage induced by external agents or normal metabolism. We are studying the interplay of DNA damaging agents, repair genes, and their protein products to decipher the complex biochemical pathways that mediate such repair. Our research focuses on repair processes that correct DNA damage produced by chemical mutagens and radiation, both ionizing and ultraviolet. The most important type of DNA repair in human cells is called excision repair. This multistep process removes damaged or inappropriate pieces of DNA -- often as a string of 29 nucleotides containing the damage -- and replaces them with intact ones. We have isolated, cloned, and mapped several human repair genes associated with the nucleotide excision repair pathway and involved in the repair of DNA damage after exposure to ultraviolet light or mutagens in cooked food. We have shown that a defect in one of these repair genes, ERCC2, is responsible for the repair deficiency in one of the groups of patients with the recessive genetic disorder xeroderma pigmentosum (XP group D). We are exploring ways to purify sufficient quantities (milligrams) of the protein products of these and other repair genes so that we can understand their functions. Our long-term goals are to link defective repair proteins to human DNA repair disorders that predispose to cancer, and to produce DNA-repair-deficient mice that can serve as models for the human disorders.

  15. FY 1997 performance evaluation and incentive fee agreement. Annual report

    SciTech Connect (OSTI)

    1997-04-01

    FY 1997 represents the second full year utilizing a results-oriented, performance-based contract. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of PNNL performance for Oct. 1, 1996-Sept. 30, 1997, as required by Articles H-24 and H-25 of the contract. Section I provides the information regarding the determination of the overall performance rating for PNNL. In Section II, six critical outcomes were defined that serve as basis for overall management of PNNL: environmental molecular sciences laboratory, environmental technology, scientific excellence, environment/safety & health operations, leadership/management, and economic development (create new businesses). Section III describes the commitments for documenting and reporting PNNL self-evaluation. In Section IV, it is stated that discussions regarding FY97 fee are still ongoing.

  16. 16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security...

    Open Energy Info (EERE)

    LibraryAdd to library Legal Document- RegulationRegulation: 16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security RequirementsLegal Abstract These regulations...

  17. NMAC 20.2.71 Air Quality Operating Permit Emissions Fees | Open...

    Open Energy Info (EERE)

    1 Air Quality Operating Permit Emissions Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NMAC 20.2.71 Air Quality...

  18. Title 43 CFR 3203.12 What Fees Must I Pay to Nominate Lands?...

    Open Energy Info (EERE)

    .12 What Fees Must I Pay to Nominate Lands? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR...

  19. H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to Perform Work on State...

  20. GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions

    Broader source: Energy.gov [DOE]

    Consistent with the Administration's commitment to transparency, DOE General Counsel Scott Blake Harris has decided that all future determinations as to the adequacy of the Nuclear Waste Fund fee...

  1. City of Santa Monica- Building Permit Fee Waiver for Solar Projects

    Broader source: Energy.gov [DOE]

    In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff...

  2. EM Richland Operations Office Contractor Earns 97 Percent of Available Fee

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office (RL) issued its fiscal year 2015 fee determination for Hanford Site contractor CH2M HILL Plateau Remediation Company (CH2M).

  3. I.C. 42-221 - Appropriation of Water Fees | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: I.C. 42-221 - Appropriation of Water FeesLegal Abstract This statutory section provides for...

  4. Cost-plus-award-fee contracts-Federal Acquisition Circular 2005-37

    Office of Energy Efficiency and Renewable Energy (EERE)

    With the issuance of Federal Acquisition Circular 2005-37, the FAR now requires, in addition to previous requirements, several new actions in using and administering a cost-plus-award-fee contract. Attached are the pre and post Federal Acquisition Circular 2005-37 requirements for using and administering cost-plus-award-fee contracts. Changes to current Departmental guidance are being considered and will be disseminated in future communications.

  5. Reclamation fee on coal production: an example of federal regulatory taxation

    SciTech Connect (OSTI)

    Reese, C.E.

    1983-09-01

    The coal mining reclamation fee is part of the federal government's efforts to regulate the strip mining of coal and to use proceeds from the fee for land use and pollution control problems associated with abandoned mines. Authorized by the 1977 Surface Mining Contol and Reclamation Act rather than the Internal Revenue Code, the exaction is still shown to be both a regulatory and a severance tax. 41 references. (DCK)

  6. Fee Waiver and Reduction Criteria | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fee Waiver and Reduction Criteria Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Advisory Exemptions How to Submit a FOIA Request Fee Waiver and Reduction Criteria Electronic Reading Room ISC Conventional Reading Rooms Reference Links Privacy Act NEPA Documents Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Kenneth Tarcza U.S. Department of

  7. Award Fee Determination Scorecard Contractor: G4S Government Solutions, Inc. - Wackenhut Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: G4S Government Solutions, Inc. - Wackenhut Services Incorporated (WSI) Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2013 - September 30, 2014 Basis of Evaluation: Award Fee Plan The contractor is required to provide, operate, and maintain an armed and uniformed protective force for the physical protection of U.S. Department of Energy (DOE) security interests and other such related duties at

  8. DOE Rates EM's Savannah River Site Contractor as 'Very Good' in Fee

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Determination Scorecard | Department of Energy Rates EM's Savannah River Site Contractor as 'Very Good' in Fee Determination Scorecard DOE Rates EM's Savannah River Site Contractor as 'Very Good' in Fee Determination Scorecard January 27, 2016 - 12:35pm Addthis H Canyon Control Room operators Terry Usry and Audrey Davis start the first process operation in H Canyon, which purifies the uranium solution for eventual use as commercial nuclear reactor fuel. H Canyon Control Room operators Terry

  9. Effluent fees: policy considerations on a source of revenue for infrastructure financing. Technical report

    SciTech Connect (OSTI)

    Casey, P.

    1988-01-01

    This project is part of the National Network for Environmental Management Studies conducted under the auspices of the Office of Cooperative Environmental Management - U.S. Environmental Protection Agency. With the phasing out of EPA's construction grants program and the implementation of State Revolving Funds (SRF's), it appears that more money will be needed for the financing of waste-water treatment facilities in the next twenty years. Infrastructure needs for waste-water treatment facilities will increase significantly due to required replacement and upgrading needs, while user fees may be significantly understated due to years of capital subsidies. With Federal seed capital for the SRF's stopping after 1994, alternative sources of funding will be necessary. An effluent fee program could both offer a way to make the polluter pay and provide a reliable financing mechanism for the SRF's. The paper discusses the experience of effluent fees in Europe, and proposes an effluent fee program that would provide needed capital to the State Revolving Fund. The fee would be tied into the National Pollutant Discharge Elimination System permits through gradual implementation. Various options for setting the fee and enforcement procedures are also discussed.

  10. ," Excise"," LUST Fee ",," Total",," Excise"," LUST Fee ",," Total",,"Notes"

    U.S. Energy Information Administration (EIA) Indexed Site

    Federal and state motor fuels taxes[1] " ," Gasoline ",,,,," Diesel" ," Excise"," LUST Fee ",," Total",," Excise"," LUST Fee ",," Total",,"Notes" "Federal",0.183,0.001,,0.184,,0.243,0.001,,0.244,,"Leaking Underground Storage Tank (LUST) fee: $0.001/gal. " ," Gasoline ",,,,," Diesel" ,"State tax","Other taxes & Fees[2] ","Total

  11. Alkylation damage repair in mammalian genomes

    SciTech Connect (OSTI)

    Mitra, S.; Roy, R.; Kim, N.K. |; Tano, K. |; Ibeanu, G.C. |; Dunn, W.C.; Natarajan, A.T.; Hartenstein, B.; Kaina, B.

    1992-11-01

    The repair of O{sup 6} -alkylguanine in DNA involves only O{sup 6} -methyltransferase (MGMT) while the repair of N-alkylpurines requires multiple proteins including N-methylpurine-DNA glycosylase (MPG). While the biochemical properties human and mouse MGMTs are very similar, the mouse MPG removes 7-methylguanine more efficiently than the human protein. An increased level of MGMT, without a change in the level of MPG associated with gene amplification, was observed in a mouse cell line resistant to 2-chloroethyl-N-nitrosourea. In contrast, no correlation was observed between MPG level and resistance to methyl methanesulfonate in Chinese hamster ovary (CHO) cells. This result suggests a protein other than MPG limits the repair rate of N-alkylpurine in CHO cells.

  12. Alkylation damage repair in mammalian genomes

    SciTech Connect (OSTI)

    Mitra, S.; Roy, R.; Kim, N.K. . Sealy Center for Molecular Science Oak Ridge National Lab., TN ); Tano, K. Oak Ridge National Lab., TN ); Ibeanu, G.C. Oak Ridge National Lab., TN ); Dunn, W.C. (

    1992-01-01

    The repair of O{sup 6} -alkylguanine in DNA involves only O{sup 6} -methyltransferase (MGMT) while the repair of N-alkylpurines requires multiple proteins including N-methylpurine-DNA glycosylase (MPG). While the biochemical properties human and mouse MGMTs are very similar, the mouse MPG removes 7-methylguanine more efficiently than the human protein. An increased level of MGMT, without a change in the level of MPG associated with gene amplification, was observed in a mouse cell line resistant to 2-chloroethyl-N-nitrosourea. In contrast, no correlation was observed between MPG level and resistance to methyl methanesulfonate in Chinese hamster ovary (CHO) cells. This result suggests a protein other than MPG limits the repair rate of N-alkylpurine in CHO cells.

  13. Payment Of the New Mexico Environment Department- Hazardous Waste Bureau Annual Business and Generation Fees Calendar Year 2011

    SciTech Connect (OSTI)

    Juarez, Catherine L.

    2012-08-31

    The purpose of this letter is to transmit to the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB), the Los alamos National Laboratory (LANL) Annual Business and Generation Fees for calendar year 2011. These fees are required pursuant to the provisions of New Mexico Hazardous Waste Act, Chapter 74, Article 4, NMSA (as amended). The Laboratory's Fenton Hill Facility did not generate any hazardous waste during the entire year, and is not required to pay a fee for calendar year 2011. The enclosed fee represents the amount for a single facility owned by the Department of Energy and co-operated by the Los Alamos National Security, LLC (LANS).

  14. Repairable chip bonding/interconnect process

    DOE Patents [OSTI]

    Bernhardt, A.F.; Contolini, R.J.; Malba, V.; Riddle, R.A.

    1997-08-05

    A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules is disclosed. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder. 10 figs.

  15. Repairable chip bonding/interconnect process

    DOE Patents [OSTI]

    Bernhardt, Anthony F.; Contolini, Robert J.; Malba, Vincent; Riddle, Robert A.

    1997-01-01

    A repairable, chip-to-board interconnect process which addresses cost and testability issues in the multi-chip modules. This process can be carried out using a chip-on-sacrificial-substrate technique, involving laser processing. This process avoids the curing/solvent evolution problems encountered in prior approaches, as well is resolving prior plating problems and the requirements for fillets. For repairable high speed chip-to-board connection, transmission lines can be formed on the sides of the chip from chip bond pads, ending in a gull wing at the bottom of the chip for subsequent solder.

  16. Protein Bridges DNA Base and Nucleotide Excision Repair Pathways

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... It turns out that ATL bridges two DNA repair pathways (base repair and nucleotide excision ... By mapping conservation of amino acid sequences between their ATL and sequences in other ...

  17. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to...

  18. Selected Bibliography on Electric Motor Repair

    Office of Energy Efficiency and Renewable Energy (EERE)

    The following series of repair documents related to electric motors were produced by the U.S. Department of Energy's Advanced Manufacturing Office (formerly the Office of Industrial Technologies) with input from trade associations, consulting companies, manufacturers, non-profit operations, and others.

  19. Antibody specific for a DNA repair protein

    DOE Patents [OSTI]

    Petrini, John H.; Morgan, William Francis; Maser, Richard Scott; Carney, James Patrick

    2006-07-11

    An isolated and purified DNA molecule encoding a DNA repair protein, p95, is provided, as is isolated and purified p95. Also provided are methods of detecting p95 and DNA encoding p95. The invention further provides p95 knock-out mice.

  20. DNA encoding a DNA repair protein

    DOE Patents [OSTI]

    Petrini, John H.; Morgan, William Francis; Maser, Richard Scott; Carney, James Patrick

    2006-08-15

    An isolated and purified DNA molecule encoding a DNA repair protein, p95, is provided, as is isolated and purified p95. Also provided are methods of detecting p95 and DNA encoding p95. The invention further provides p95 knock-out mice.

  1. Inspect and Repair Steam Traps | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inspect and Repair Steam Traps Inspect and Repair Steam Traps This tip sheet on inspecting and repairing steam traps provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies. STEAM TIP SHEET #1 Inspect and Repair Steam Traps (January 2012) (393.77 KB) More Documents & Publications Flash High-Pressure Condensate to Regenerate Low-Pressure Steam Steam Pressure Reduction: Opportunities and Issues Use Steam Jet Ejectors or Thermocompressors

  2. Component Repair Times Obtained from MSPI Data

    SciTech Connect (OSTI)

    Eide, Steven A.

    2015-05-01

    Information concerning times to repair or restore equipment to service given a failure is valuable to probabilistic risk assessments (PRAs). Examples of such uses in modern PRAs include estimation of the probability of failing to restore a failed component within a specified time period (typically tied to recovering a mitigating system before core damage occurs at nuclear power plants) and the determination of mission times for support system initiating event (SSIE) fault tree models. Information on equipment repair or restoration times applicable to PRA modeling is limited and dated for U.S. commercial nuclear power plants. However, the Mitigating Systems Performance Index (MSPI) program covering all U.S. commercial nuclear power plants provides up-to-date information on restoration times for a limited set of component types. This paper describes the MSPI program data available and analyzes the data to obtain median and mean component restoration times as well as non-restoration cumulative probability curves. The MSPI program provides guidance for monitoring both planned and unplanned outages of trains of selected mitigating systems deemed important to safety. For systems included within the MSPI program, plants monitor both train UA and component unreliability (UR) against baseline values. If the combined system UA and UR increases sufficiently above established baseline results (converted to an estimated change in core damage frequency or CDF), a “white” (or worse) indicator is generated for that system. That in turn results in increased oversight by the US Nuclear Regulatory Commission (NRC) and can impact a plant’s insurance rating. Therefore, there is pressure to return MSPI program components to service as soon as possible after a failure occurs. Three sets of unplanned outages might be used to determine the component repair durations desired in this article: all unplanned outages for the train type that includes the component of interest, only

  3. Emergency pipe line repair connects subsea pipe lines

    SciTech Connect (OSTI)

    Lerique, M.P.; Thiberge, P. ); Wright, N. )

    1990-11-01

    Emergency repair of any subsea line pipe must form a high-integrity, metal-to-metal seal. This paper presents a remote, diverless repair system that utilizes master flanges, a connector and a spool piece to repair line pipe in deep offshore waters.

  4. U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site

    SciTech Connect (OSTI)

    1995-08-03

    During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

  5. Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015

    Broader source: Energy.gov [DOE]

    DOE's Oak Ridge Environmental Management Office told URS | CH2M Oak Ridge LLC (UCOR) in a letter that it had completed its evaluation of the company's performance for the award fee period of April to September 2015 and determined that UCOR earned a fee of more than $4.4 million for the period.

  6. Helium bubble distributions in reactor tank repair specimens. Part 1

    SciTech Connect (OSTI)

    Tosten, M.H.; Kestin, P.A.

    1992-03-01

    This report discusses the Reactor Tank Repair (RTR) program was initiated to develop an in-tank repair process capable of repairing stress corrosion cracks within the SRS reactor tank walls, in the event that such a repair is needed. Previous attempts to repair C-reactor tank with a gas tungsten arc (GTA) welding process were unsuccessful due to significant cracking that occurred in the heat-affected-zones adjacent to the repair welds. It was determined that this additional cracking was a result of helium embrittlement caused by the combined effects of helium (existing within the tank walls), the high heat input associated with the GTA process, and weld shrinkage stresses. Based on the results of earlier studies it was suggested that the effects of helium embrittlement could be minimized by using a low heat input GMA process. Metallographic analysis played an important role throughout the investigation of alternative welding methods for the repair of helium-containing materials.

  7. Helium bubble distributions in reactor tank repair specimens

    SciTech Connect (OSTI)

    Tosten, M.H.; Kestin, P.A.

    1992-03-01

    This report discusses the Reactor Tank Repair (RTR) program was initiated to develop an in-tank repair process capable of repairing stress corrosion cracks within the SRS reactor tank walls, in the event that such a repair is needed. Previous attempts to repair C-reactor tank with a gas tungsten arc (GTA) welding process were unsuccessful due to significant cracking that occurred in the heat-affected-zones adjacent to the repair welds. It was determined that this additional cracking was a result of helium embrittlement caused by the combined effects of helium (existing within the tank walls), the high heat input associated with the GTA process, and weld shrinkage stresses. Based on the results of earlier studies it was suggested that the effects of helium embrittlement could be minimized by using a low heat input GMA process. Metallographic analysis played an important role throughout the investigation of alternative welding methods for the repair of helium-containing materials.

  8. Fact #901: November 30, 2015 States Assessing Fees on Electric Vehicles to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Make Up For Lost Fuel Tax Revenue | Department of Energy 1: November 30, 2015 States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue Fact #901: November 30, 2015 States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue SUBSCRIBE to the Fact of the Week The maintenance of our highways has traditionally been funded from a combination of Federal and state taxes collected at the pump from the sale of motor fuels. Because electric vehicles (EVs) do

  9. Section L Attachment I - Summary and Fee Sheet Amendment 000002.xlsx

    National Nuclear Security Administration (NNSA)

    I Summary and Fee Sheet Amendment 000002 Nevada National Security Site Management and Operating (M&O) Contract PROPOSED 2017 Mgt Team Costs 2018 Mgt Team Costs Subtotal $0 FEE CLIN 0001 - Management and Operation of NNSS Base Term Year 1 Year 2 Year 3 Year 4 Year 5 Option Term Year 1 Year 2 Year 3 Year 4 Year 5 Subtotal $0 CLIN 0002 - Strategic Partnership Program Base Term Year 1 Year 2 Year 3 Year 4 Year 5 Option Term Year 1 Year 2 Year 3 Year 4 Year 5 Subtotal $0 TOTAL ALL $0 Mgt Team

  10. Paducah and DUF6 Award Fees Determined for Three Prime Contracts |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Paducah and DUF6 Award Fees Determined for Three Prime Contracts Paducah and DUF6 Award Fees Determined for Three Prime Contracts April 27, 2016 - 12:45pm Addthis A Swift & Staley heavy equipment operator loads a salt spreader at Paducah’s C-732 Salt Storage Facility. A Swift & Staley heavy equipment operator loads a salt spreader at Paducah's C-732 Salt Storage Facility. LEXINGTON, Ky. - EM has completed final performance evaluations of two prime

  11. Office of Inspector General report on audit of Department of Energy management and operating contractor available fees

    SciTech Connect (OSTI)

    1996-05-01

    The Office of Procurement and Assistance Management has proposed changes to the method used to annually calculate and negotiate ``for profit`` management and operating contractor available fees. This proposal will increase contractor fees in exchange for the contractor`s purported assumption of additional risk. In 1991, the Department, through the Accountability Rule, increased contractor fees as an incentive to improve contractor performance and accountability. Despite the lack of measurable benefits of this effort, the Department is crafting a new fee policy which will, depending upon how it is executed, increase fees above the amount provided through the Accountability Rule as an incentive to the Department`s management and operating contractors. The objective of the audit was to determine whether the Department`s proposed change to the fee structure for determining management and operating contractor fees will be cost effective. This report describes the study`s approach, its findings and recommendations, management and auditor comments, and includes appendices with further data.

  12. EM’s West Valley Cleanup Contactor Receives 85 Percent of Available Fee Award

    Broader source: Energy.gov [DOE]

    EST VALLEY, N.Y. – EM announced that the contractor at its West Valley Demonstration Project (WVDP) cleanup earned $250,000, or nearly 85 percent of the available fee award of $295,495 for the six-month period ending Feb. 29 this year.

  13. Restore: Modeling Repair and Restoration Processes | Argonne National

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Restore: Modeling Repair and Restoration Processes Restore: Modeling Repair and Restoration Processes Argonne's Restore software models complex sets of steps required to accomplish a goal, such as repairing a ruptured natural gas pipeline, when the time required to complete a step may be uncertain. For example, external conditions (i.e., the time of day, weather, and availability of crew) may affect one or more of the steps required to accomplish a goal. Therefore,

  14. Occupational Radiation Exposure During Endovascular Aortic Repair

    SciTech Connect (OSTI)

    Sailer, Anna M.; Schurink, Geert Willem H.; Bol, Martine E. Haan, Michiel W. de Zwam, Willem H. van Wildberger, Joachim E. Jeukens, Cécile R. L. P. N.

    2015-08-15

    PurposeThe aim of the study was to evaluate the radiation exposure to operating room personnel and to assess determinants for high personal doses during endovascular aortic repair.Materials and MethodsOccupational radiation exposure was prospectively evaluated during 22 infra-renal aortic repair procedures (EVAR), 11 thoracic aortic repair procedures (TEVAR), and 11 fenestrated or branched aortic repair procedures (FEVAR). Real-time over-lead dosimeters attached to the left breast pocket measured personal doses for the first operators (FO) and second operators (SO), radiology technicians (RT), scrub nurses (SN), anesthesiologists (AN), and non-sterile nurses (NSN). Besides protective apron and thyroid collar, no additional radiation shielding was used. Procedural dose area product (DAP), iodinated contrast volume, fluoroscopy time, patient’s body weight, and C-arm angulation were documented.ResultsAverage procedural FO dose was significantly higher during FEVAR (0.34 ± 0.28 mSv) compared to EVAR (0.11 ± 0.21 mSv) and TEVAR (0.06 ± 0.05 mSv; p = 0.003). Average personnel doses were 0.17 ± 0.21 mSv (FO), 0.042 ± 0.045 mSv (SO), 0.019 ± 0.042 mSv (RT), 0.017 ± 0.031 mSv (SN), 0.006 ± 0.007 mSv (AN), and 0.004 ± 0.009 mSv (NSN). SO and AN doses were strongly correlated with FO dose (p = 0.003 and p < 0.001). There was a significant correlation between FO dose and procedural DAP (R = 0.69, p < 0.001), iodinated contrast volume (R = 0.67, p < 0.001) and left-anterior C-arm projections >60° (p = 0.02), and a weak correlation with fluoroscopy time (R = 0.40, p = 0.049).ConclusionAverage FO dose was a factor four higher than SO dose. Predictors for high personal doses are procedural DAP, iodinated contrast volume, and left-anterior C-arm projections greater than 60°.

  15. Federal Facilities Maintenance, Repair Report Calls for Action

    SciTech Connect (OSTI)

    Bartlett, Rosemarie

    2012-10-01

    This article is an overview of a recent report by the Federal Facilities Council on "Predicting Outcomes from Investments in Maintenance and Repair of Federal Facilities."

  16. Advanced maintenance, inspection & repair technology for nuclear power plants

    SciTech Connect (OSTI)

    Hinton, B.M.

    1994-12-31

    Maintenance, inspection, and repair technology for nuclear power plants is outlined. The following topics are discussed: technology for reactor systems, reactor refueling bridge, fuel inspection system, fuel shuffling software, fuel reconstitution, CEA/RCCA/CRA inspection, vessel inspection capabilities, CRDM inspection and repair, reactor internals inspection and repair, stud tensioning system, stud/nut cleaning system, EDM machining technology, MI Cable systems, core exit T/C nozzle assemblies, technology for steam generators, genesis manipulator systems, ECT, UT penetrant inspections, steam generator repair and cleaning systems, technology for balance of plant, heat exchangers, piping and weld inspections, and turbogenerators.

  17. Leveraging Service Calls and Emergency Repairs for Energy Efficiency Marketing

    Broader source: Energy.gov [DOE]

    Better Buildings Residential Network Peer Exchange Call Series: Leveraging Service Calls and Emergency Repairs, Call Slides and Discussion Summary, November 13, 2014.

  18. Window Replacement, Rehabilitation, & Repair Guides- Building America Top Innovation

    Broader source: Energy.gov [DOE]

    Building America team Building Science Corporation guides contractors through several options for repairing or replacing old windows to improve air sealing and thermal performance.

  19. Waste minimization in an autobody repair shop

    SciTech Connect (OSTI)

    Baria, D.N.; Dorland, D.; Bergeron, J.T.

    1994-12-31

    This work was done to document the waste minimization incorporated in a new autobody repair facility in Hermantown, Minnesota. Humes Collision Center incorporated new waste reduction techniques when it expanded its old facilities in 1992 and it was able to achieve the benefits of cost reduction and waste reduction. Humes Collision Center repairs an average of 500 cars annually and is a very small quantity generator (VSQG) of hazardous waste, as defined by the Minnesota Pollution Control Agency (MPCA). The hazardous waste consists of antifreeze, batteries, paint sludge, refrigerants, and used oil, while the nonhazardous waste consists of cardboard, glass, paint filters, plastic, sanding dust, scrap metal, and wastewater. The hazardous and nonhazardous waste output were decreased by 72%. In addition, there was a 63% reduction in the operating costs. The waste minimization includes antifreeze recovery and recycling, reduction in unused waste paint, reduction, recovery and recycle of waste lacquer thinner for cleaning spray guns and paint cups, elimination of used plastic car bags, recovery and recycle of refrigerant, reduction in waste sandpaper and elimination of sanding dust, and elimination of waste paint filters. The rate of return on the investment in waste minimization equipment is estimated from 37% per year for the distillation unit, 80% for vacuum sanding, 146% for computerized paint mixing, 211% for the refrigerant recycler, to 588% per year for the gun washer. The corresponding payback time varies from 3 years to 2 months.

  20. Deep patch technique for landslide repair. Final report

    SciTech Connect (OSTI)

    Helwany, B.M.

    1994-10-01

    The report describes the laboratory testing of the `USFS deep patch` technique and a CTI modification of this technique for repairing landslides with geosynthetic reinforcement. The technique involves replacing sections of roadway lost due to landslides on top of a geosynthetically-reinforced embankment. The CTI modification involves replacing the reinforced slope with a geosynthetically-reinforced retaining wall with a truncated base. Both techniques rely on the cantilevering ability of the reinforced mass to limit the load on the foundation with a high slide potential. The tests with road base showed that (1) both the USFS and CTI repair reduced effectively the adverse effects of local landsliding on the highway pavement by preventing crack propagation; (2) the USFS repair increased the stability of the repaired slope, which was in progressive failure, by reducing the stresses exerted on it; and (3) the CTI repair produced substantially greater stresses on its foundation due to the truncated base of the reinforced mass.

  1. Better Buildings Neighborhood Program Peer Exchange Calls on Program Sustainability: Unique Fee-for-Service Revenues Call Slides and Discussion Summary, April 11, 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1, 2013 Better Buildings Neighborhood Program Peer Exchange Calls on Program Sustainability: Unique Fee-for-Service Revenues Call Slides and Discussion Summary Agenda * Welcome and Introductions  What are some unique fee-for-service revenues your program is implementing or considering? * Program Experience  Chris Jones, Greater Cincinnati Energy Alliance * Discussion Topics:  How can you determine the feasibility and financial potential of unique fee-for-service revenues?  How do you

  2. Equity of commercial low-level radioactive waste disposal fees. Report to Congress

    SciTech Connect (OSTI)

    1998-02-01

    In the Report accompanying the Fiscal Year 1997 Senate Energy and Water Development Appropriations Bill, the Senate Appropriations Committee directed the Department of Energy (DOE) to prepare a study of the costs of operating a low-level radioactive waste (LLW) disposal facility such as the one at Barnwell, South Carolina, and to determine whether LLW generators are paying equitable disposal fees. The disposal costs of four facilities are reviewed in this report, two operating facilities and two planned facilities. The operating facilities are located at Barnwell, South Carolina, and Richland, Washington. They are operated by Chem-Nuclear, LLC, (Chem-Nuclear), and US Ecology, Inc., (US Ecology), respectively. The planned facilities are expected to be built at Ward Valley, California, and Sierra Blanca, Texas. They will be operated by US Ecology and the State of Texas, respectively. This report found that disposal fees vary significantly among facilities for a variety of reasons. However, the information suggests that at each disposal facility, LLW generators pay equitable disposal fees.

  3. Fatigue response of repaired thick aluminum panels with bondline flaws

    SciTech Connect (OSTI)

    Conley, D.S.

    1999-03-01

    This research investigated the fatigue response of precracked 558 x 177.8 x 6.35 mm (22.0 x 7.0 x 0.25 in) 2024-T351 aluminum panels repaired with single-sided partially bonded, unidirectional, eighteen ply boron/epoxy reinforcements. Disbonds were introduced into the bondline of each repair during the adhesion process using teflon inserts. Five different disbond configurations, with varying disbond locations and sizes, were tested. Each repaired panel was subjected to constant amplitude cyclic fatigue loading with a maximum stress of 120MPa. Results from the different configurations were compared against one another and against repaired panels with no debonds to assess the effect of disbonds on repair life. Results from the experimentation showed that even in the case of very large disbonds (20% of total bond area), the bonded repairs significantly extended the lives of the cracked panels. Disbond configurations with disbonds located away from the crack in the aluminum panel, performed comparably to the repaired panel with no disbonds. Disbond configurations with disbonds covering the crack in the aluminum panel yielded slightly lower lives than those obtained from repaired panels with no disbonds. Cyclic fatigue loading caused no increase in size of the artificially induced disbonds. Cyclic disbond growth was observed in the immediate vicinity of the crack. Finite element analysis using the Three Layer Technique was performed to assess the ability of current modeling techniques in predicting the life of cracked thick aluminum panels repaired with composite patches. Results from the finite element analysis were shown to very closely match experimental data.

  4. Repairing Roofs and Ceilings: How To's for the Handy Homeowner

    SciTech Connect (OSTI)

    2006-01-01

    This brochure provides handy homeowners with tips on how to properly repair roofs and ceilings in their homes that sustained damage during a hurricane. This publications is a part of the How To's for the Handy Homeowner Series.

  5. Repairing Windows & Doors: How To's for the Handy Homeowner

    SciTech Connect (OSTI)

    2006-01-05

    This brochure contains tips for homeowners to repair windows and doors in their home that sustained hurricane damage. This publication is a part of the How To's for the Handy Homeowner Series.

  6. Repairing Walls & Floors: How To's for the Handy Homeowner

    SciTech Connect (OSTI)

    2006-01-09

    This brochure provides handy homeowners with tips on how to properly repair walls and floors in their homes that sustained damage during a hurricane. This publications is a part of the How To's for the Handy Homeowner Series.

  7. Battery, heal thyself: Inventing self-repairing batteries | Argonne...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Battery, heal thyself: Inventing self-repairing batteries By Louise Lerner * January 11, 2012 Tweet EmailPrint Imagine dropping your phone on the hard concrete sidewalk-but when...

  8. To: Mansueti, Lawrence Subject: RE: Pepco Scheduled Line Repair...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 29, 2007 6:28 PM To: Mansueti, Lawrence Subject: RE: Pepco Scheduled Line Repair Dec. 1-20, 2006 Larry, Regarding the planned line outage, scheduled for Feb. 20 through Mar...

  9. Intermediate hearth repair technique at Thyssen Stahl AG

    SciTech Connect (OSTI)

    Kowalski, W.; Bachhofen, H.J.; Ruether, P.; Ballewski, T.

    1996-12-31

    Nowadays various techniques for the fastest possible intermediate repair and/or emplacement of refractory materials above the tuyere level allow a significant extension of furnace campaign life. The latter are hence now exclusively determined by the service life of the hearth. The improvement of hearth monitoring and the estimation of residual brick strength of the refractory lining on the basis of temperature measurements in the hearth enable the location of individual zones of premature wear. These measurement methods, which were developed by Thyssen Stahl AG, aid the decision to undertake selective repair of the hearth. Three areas of repair are differentiated: taphole zone; hearth wall, localized; and hearth wall, extensive. This hearth repair method is described in this report using the example of hearth refurbishing blast furnace 8, Hamborn.

  10. Inspect and Repair Steam Traps - Steam Tip Sheet #1

    SciTech Connect (OSTI)

    2012-01-31

    This revised AMO tip sheet on inspecting and repairing steam traps provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  11. Mechanism of DNA interstrand cross-link processing by repair...

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Search Results Journal Article: Mechanism of DNA interstrand cross-link processing by repair nuclease FAN1 Citation Details In-Document Search Title: Mechanism of ...

  12. Bearing repair services offer a cost-effective alternative to expensive replacement

    SciTech Connect (OSTI)

    2009-02-15

    The article, based on a presentation during MINExpo 2008, explains how advancement is bearing design, material, maintenance and repair methods have greatly improved the potential for and popularity of bearing repair as an effective way to extend bearing life. The Trinken Co. offers a variety of service options including repair, recertification, reconditioning and remanufacturing. Benefits of a quality repair program are outlined. 2 photos.

  13. Protein Bridges DNA Base and Nucleotide Excision Repair Pathways

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protein Bridges DNA Base and Nucleotide Excision Repair Pathways Protein Bridges DNA Base and Nucleotide Excision Repair Pathways Print Wednesday, 28 October 2009 00:00 Alkyltransferase proteins (AGT) protect cells from the biological effects of DNA damage caused by the addition of alkyl groups (alkylation). Alkyltransferase-like proteins (ATLs) can do the same, but they lack the reactive cysteine residue that allows the alkyltransferase function, and the mechanism for cell protection has

  14. EM's Oak Ridge Office Contractor Scores High in Latest Award Fee Evaluation

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM gave URS | CH2M Oak Ridge LLC (UCOR) a score of nearly 96 percent, allowing the contractor to earn over $4.4 million of the available fee of more than $4.6 million for the period from April to September 2015. UCOR is responsible for cleaning up the East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, as well as other select sites on DOE’s Oak Ridge Reservation under a contract valued at $2.4 billion.

  15. Ice plug employed on subsea pipeline bend during repair

    SciTech Connect (OSTI)

    1997-12-22

    The first controlled-temperature ice plug in the bend of an offshore gas trunkline has been carried out for Phillips Petroleum Co. Norway on its Norpipe A.S. platform in the German sector of the North Sea. The procedure was part of a subsea valve repair operation. The ice plug was successfully formed offshore and tested to a differential pressure of 1,450 psi. Repair of two valves required only 5 days during which time gas production was operating at close to 50--60% via the platform bypass, says the service company. The paper discusses the procedure.

  16. Thermosetting Polymer-Matrix Composites for Strucutral Repair Applications

    SciTech Connect (OSTI)

    William Kirby Goertzen

    2007-12-01

    Several classes of thermosetting polymer matrix composites were evaluated for use in structural repair applications. Initial work involved the characterization and evaluation of woven carbon fiber/epoxy matrix composites for structural pipeline repair. Cyanate ester resins were evaluated as a replacement for epoxy in composites for high-temperature pipe repair applications, and as the basis for adhesives for resin infusion repair of high-temperature composite materials. Carbon fiber/cyanate ester matrix composites and fumed silica/cyanate ester nanocomposites were evaluated for their thermal, mechanical, viscoelastic, and rheological properties as they relate to their structure, chemistry, and processing characteristics. The bisphenol E cyanate ester under investigation possesses a high glass transition temperature, excellent mechanical properties, and unique ambient temperature processability. The incorporate of fumed silica served to enhance the mechanical and rheological properties of the polymer and reduce thermal expansion without sacrificing glass transition or drastically altering curing kinetics. Characterization of the composites included dynamic mechanical analysis, thermomechanical analysis, differential scanning calorimetry, thermogravimetric analysis, rheological and rheokinetic evaluation, and transmission electron microscopy.

  17. Methods to alter levels of a DNA repair protein

    DOE Patents [OSTI]

    Petrini, John H.; Morgan, William Francis; Maser, Richard Scott; Carney, James Patrick

    2006-10-17

    An isolated and purified DNA molecule encoding a DNA repair protein, p95, is provided, as is isolated and purified p95. Also provided are methods of detecting p95 and DNA encoding p95. The invention further provides p95 knock-out mice.

  18. FOIA FEES

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2. Requestors who are representative of the news media: Responsible for reproduction costs after the first 100 pages. 3. Educational and non-commercial scientific institution ...

  19. Development of quick repairing technique for ceramic burner in hot stove of blast furnace

    SciTech Connect (OSTI)

    Kondo, Atsushi; Doura, Kouji; Nakamura, Hirofumi

    1997-12-31

    Refractories of ceramic burner in hot stoves at Wakayama No. 4 blast furnace were damaged. There are only three hot stoves, so repairing must be done in a short. Therefore, a quick repairing technique for ceramic burners has been developed, and two ceramic burners were repaired in just 48 hours.

  20. 1986 Federal Interim Storage fee study: a technical and economic analysis

    SciTech Connect (OSTI)

    Not Available

    1986-09-01

    JAI examined alternative methods for structuring charges for federal interim storage (FIS) services and concluded that the combined interests of the Department and the users would be best served, and costs most appropriately recovered, by a two-part fee involving an Initial Payment upon execution of a contract for FIS services followed by a Final Payment upon delivery of the spent fuel to the Department. The Initial Payment would be an advance payment covering the pro rata share of preoperational costs, including (1) the capital costs of the required transfer facilities and storage area, (2) development costs, (3) government administrative costs including storage fund management, (4) impact aid payments made in accordance with Section 136(e) of the Act, and (5) module costs (i.e., storage casks, drywells or silos). The Final Payment would be made at the time of delivery of the spent fuel to the Department and would be calculated to cover the sum of the following: (1) any under- or over-estimation in the costs used to calculate the Initial Payment of the fee (including savings due to rod consolidation), and (2) the total estimated cost of operation and decommissioning of the FIS facilities (including government administrative costs, storage fund management and impact aid). The module costs were included in the Initial Payment to preclude the possible need to obtain appropriations for federal funds to support the purchase of the modules in advance of receipt of the Final Payment. Charges for the transport of spent fuel from the reactor site to FIS facilities would be separately assessed at actual cost since these will be specific to each reactor site and destination.

  1. 1985 Federal Interim Storage Fee Study: a technical and economic analysis

    SciTech Connect (OSTI)

    Not Available

    1985-09-01

    JAI examined alternative methods for structuring charges for FIS services and concluded that the combined interests of the Deaprtment and the users would be best served, and costs most appropriately recovered, by a two-part fee involving an Initial Payment upon execution of a contract for FIS services followed by a Final Payment upon delivery of the spent fuel to the Department. The Initial Payment would be an advance payment covering the pro rata share of preoperational costs, including (1) the capital costs of the required transfer facilities and storage area, (2) development costs, (3) government administrative costs including storage fund management, (4) impact aid payments made in accordance with section 136(e) of the Act, and (5) module costs (i.e., storage casks, drywells or silos). The Final Payment would be made at the time of delivery of the spent fuel to the Department and would be calculated to cover the sum of the following: (1) any under-or over-estimation in the costs used to calculate the Initial Payment of the fee (including savings due to rod consolidation), and (2) the total estimated cost of operation and decommissioning of the FIS facilities (including government administrative costs, storage fund management and impact aid). The module costs were included in the Initial Payment to preclude the possible need to obtain appropriations for federal funds to support the purchase of the modules in advance of receipt of the Final Payment. Charges for the transport of spent fuel from the reactor site to FIS facilities would be separately assessed at actual cost since these will be specific to each reactor site and destination.

  2. Cycling with BRCA2 from DNA repair to mitosis

    SciTech Connect (OSTI)

    Lee, Hyunsook

    2014-11-15

    Genetic integrity in proliferating cells is guaranteed by the harmony of DNA replication, appropriate DNA repair, and segregation of the duplicated genome. Breast cancer susceptibility gene BRCA2 is a unique tumor suppressor that is involved in all three processes. Hence, it is critical in genome maintenance. The functions of BRCA2 in DNA repair and homology-directed recombination (HDR) have been reviewed numerous times. Here, I will briefly go through the functions of BRCA2 in HDR and focus on the emerging roles of BRCA2 in telomere homeostasis and mitosis, then discuss how BRCA2 exerts distinct functions in a cell-cycle specific manner in the maintenance of genomic integrity. - Highlights: • BRCA2 is a multifaceted tumor suppressor and is crucial in genetic integrity. • BRCA2 exerts distinct functions in cell cycle-specific manner. • Mitotic kinases regulate diverse functions of BRCA2 in mitosis and cytokinesis.

  3. Thermostatic/orifice trap reduces fuel, repair costs

    SciTech Connect (OSTI)

    Not Available

    1982-11-01

    This article is an evaluation of a steam trap that combines the continuous drain oriface with a thermostatically controlled trap oriface to efficiently remove condensate from virtually any steam system within its operating limits. This trap effectively reduces fuel and repair costs and has a capacity of 6000 il/hr, handles various pressures up to 600 psig, and operates against back pressures up to 90% of inlet pressure.

  4. Protein Bridges DNA Base and Nucleotide Excision Repair Pathways

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protein Bridges DNA Base and Nucleotide Excision Repair Pathways Print Alkyltransferase proteins (AGT) protect cells from the biological effects of DNA damage caused by the addition of alkyl groups (alkylation). Alkyltransferase-like proteins (ATLs) can do the same, but they lack the reactive cysteine residue that allows the alkyltransferase function, and the mechanism for cell protection has remained unknown. To address this mystery, a British-American team lead by researchers at the Scripps

  5. Protein Bridges DNA Base and Nucleotide Excision Repair Pathways

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protein Bridges DNA Base and Nucleotide Excision Repair Pathways Print Alkyltransferase proteins (AGT) protect cells from the biological effects of DNA damage caused by the addition of alkyl groups (alkylation). Alkyltransferase-like proteins (ATLs) can do the same, but they lack the reactive cysteine residue that allows the alkyltransferase function, and the mechanism for cell protection has remained unknown. To address this mystery, a British-American team lead by researchers at the Scripps

  6. Protein Bridges DNA Base and Nucleotide Excision Repair Pathways

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protein Bridges DNA Base and Nucleotide Excision Repair Pathways Print Alkyltransferase proteins (AGT) protect cells from the biological effects of DNA damage caused by the addition of alkyl groups (alkylation). Alkyltransferase-like proteins (ATLs) can do the same, but they lack the reactive cysteine residue that allows the alkyltransferase function, and the mechanism for cell protection has remained unknown. To address this mystery, a British-American team lead by researchers at the Scripps

  7. Blade reliability collaborative : collection of defect, damage and repair data.

    SciTech Connect (OSTI)

    Ashwill, Thomas D.; Ogilvie, Alistair B.; Paquette, Joshua A.

    2013-04-01

    The Blade Reliability Collaborative (BRC) was started by the Wind Energy Technologies Department of Sandia National Laboratories and DOE in 2010 with the goal of gaining insight into planned and unplanned O&M issues associated with wind turbine blades. A significant part of BRC is the Blade Defect, Damage and Repair Survey task, which will gather data from blade manufacturers, service companies, operators and prior studies to determine details about the largest sources of blade unreliability. This report summarizes the initial findings from this work.

  8. Building America Top Innovations 2013 Profile – Window Replacement, Rehabilitation, & Repair Guide

    SciTech Connect (OSTI)

    none,

    2013-09-01

    In this Top Innovation profile, Building Science Corporation guides contractors through several options for repairing or replacing old windows to improve air sealing and thermal performance.

  9. One "Cool Tool" That's Helping Repair Your DNA | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Cool Tool" That's Helping Repair Your DNA One "Cool Tool" That's Helping Repair Your DNA April 18, 2011 - 1:20pm Addthis Charles Rousseaux Charles Rousseaux Senior Communications Specialist (detailee) What are the key facts? Berkeley Lab's Advanced Light Source produces x-ray light that shines a billion times bright than the sun. Scientists discovered the motor that drives the actual repair of the DNA repair machine called MRN, which is tethered to the rest of the machine in

  10. adaptation of DNA repair Byrne, Rose T; Klingele, Audrey J; Cabot...

    Office of Scientific and Technical Information (OSTI)

    Evolution of extreme resistance to ionizing radiation via genetic adaptation of DNA repair Byrne, Rose T; Klingele, Audrey J; Cabot, Eric L; Schackwitz, Wendy S; Martin, Jeffrey A;...

  11. WPN 12-9: Weatherization Assistance Program Incidental Repair Measure Guidance

    Broader source: Energy.gov [DOE]

    To provide guidance on incidental repair measures (IRM) allowable under the U.S. Department of Energy Weatherization Assistance Program (WAP).

  12. Brain necrosis after fractionated radiation therapy: Is the halftime for repair longer than we thought?

    SciTech Connect (OSTI)

    Bender, Edward T.

    2012-11-15

    Purpose: To derive a radiobiological model that enables the estimation of brain necrosis and spinal cord myelopathy rates for a variety of fractionation schemes, and to compare repair effects between brain and spinal cord. Methods: Sigmoidal dose response relationships for brain radiation necrosis and spinal cord myelopathy are derived from clinical data using nonlinear regression. Three different repair models are considered and the repair halftimes are included as regression parameters. Results: For radiation necrosis, a repair halftime of 38.1 (range 6.9-76) h is found with monoexponential repair, while for spinal cord myelopathy, a repair halftime of 4.1 (range 0-8) h is found. The best-fit alpha beta ratio is 0.96 (range 0.24-1.73)Conclusions: A radiobiological model that includes repair corrections can describe the clinical data for a variety of fraction sizes, fractionation schedules, and total doses. Modeling suggests a relatively long repair halftime for brain necrosis. This study suggests that the repair halftime for late radiation effects in the brain may be longer than is currently thought. If confirmed in future studies, this may lead to a re-evaluation of radiation fractionation schedules for some CNS diseases, particularly for those diseases where fractionated stereotactic radiation therapy is used.

  13. Best Management Practice #3: Distribution System Audits, Leak Detection, and Repair

    Broader source: Energy.gov [DOE]

    A distribution system audit, or leak detection and repair program, may help federal facilities identify and reduce water losses and be better stewards of water as a resource.

  14. New Technologies for Repairing Aging Cables in Nuclear Power Plants

    SciTech Connect (OSTI)

    Simmons, Kevin L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fifield, Leonard S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Westman, Matthew P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-09-11

    The goal of this project is to demonstrate a proof-of-concept for a technique to repair aging cables that have been subjected to degradation associated with long-term thermal and radiation exposure in nuclear power plants. The physical degradation of the aging cables manifests itself primarily as cracking and increased brittleness of the polymeric electrical insulation. Therefore, the proposed cable-repair concept comprises development of techniques to impart a softening agent within the deteriorated polymer insulation jacket so as to regain the ability of the insulation to stretch without failing and possibly to heal existing cracks in the insulation. Our approach is to use commercially available ethylene-propylene rubber (EPR) as the relevant test material, demonstrate the adsorption of chemical treatments in the EPR and quantify changes in resulting physical and mechanical properties. EPR cable samples have been thermally treated in air to produce specimens corresponding to the full range of cable age-performance points from new (>350% elongation at break) to end-of-life (<50% elongation at break). The current focus is on two chemical treatments selected as candidates for restoring age-related cable elasticity loss: a rubber plasticizer and a reactive silane molecule. EPR specimens of 200, 150, 100, and 50% elongation at break have been soaked in the candidate chemical treatments and the kinetics of chemical uptake, measured by change in mass of the samples, has been determined. Mechanical properties as a function of aging and chemical treatment have been measured including ultimate tensile strength, tensile modulus at 50% strain, elongation at break, and storage modulus. Dimensional changes with treatment and changes in glass transition temperature were also investigated. These ongoing experiments are expected to provide insight into the physical-chemical nature of the effect of thermal degradation on EPR rejuvenation limits and to advance novel methods for

  15. Injection repair of carbon fiber/bismaleimide composite panels with bisphenol E cyanate ester resin

    SciTech Connect (OSTI)

    Thunga, Mahendra; Bauer, Amy; Obusek, Kristine; Meilunas, Ray; Akinc, Mufit; Kessler, Michael R

    2014-08-01

    Resin injection of bisphenol E cyanate ester, a low viscosity resin that cures into a high temperature thermoset polymer, is investigated as a reliable repair method to restore strength and stiffness in delaminated carbon fiber/bismaleimide composites used in aircraft panels. The influence of temperature on the viscosity of the uncured resin was measured to optimize the injection conditions for high resin infiltration into the delaminations. The repair efficiency of the resin was evaluated by varying the panel thickness and the method by which the delamination damage was created in the composite specimens. Ultrasonic scanning (C-scan), flash thermography images, and cross-section analysis of repaired panels revealed excellent resin infiltration into the damaged region. Evaluation of mechanical repair efficiency using both bending stiffness and in-plain compressive strength of the composite panels as the repair metrics showed values exceeding 100%.

  16. Composite vascular repair grafts via micro-imprinting and electrospinning

    SciTech Connect (OSTI)

    Liu, Yuanyuan Hu, Qingxi; Xiang, Ke Chen, Haiping Li, Yu

    2015-04-15

    Composite vascular grafts formed by micro-imprinting and electrospinning exhibited improved mechanical properties relative to those formed by electrospinning alone. The three-layered composite grafts mimic the three-layered structure of natural blood vessels. The middle layer is made by micro-imprinting poly-p-dioxanone (PPDO), while the inner and outer layers are electrospun mixtures of chitosan and polyvinyl alcohol. The graft morphology is characterized with scanning electron microscopy. For constant graft thicknesses, the PPDO increases the mechanical strength. Cells cultivated on the vascular grafts adhere and proliferate better because of the natural, biological chitosan in the inner and outer layers. Overall, the composite scaffolds could be good candidates for blood vessel repair.

  17. Method of tissue repair using a composite material

    DOE Patents [OSTI]

    Hutchens, Stacy A.; Woodward, Jonathan; Evans, Barbara R.; O'Neill, Hugh M.

    2016-03-01

    A composite biocompatible hydrogel material includes a porous polymer matrix, the polymer matrix including a plurality of pores and providing a Young's modulus of at least 10 GPa. A calcium comprising salt is disposed in at least some of the pores. The porous polymer matrix can comprise cellulose, including bacterial cellulose. The composite can be used as a bone graft material. A method of tissue repair within the body of animals includes the steps of providing a composite biocompatible hydrogel material including a porous polymer matrix, the polymer matrix including a plurality of pores and providing a Young's modulus of at least 10 GPa, and inserting the hydrogel material into cartilage or bone tissue of an animal, wherein the hydrogel material supports cell colonization in vitro for autologous cell seeding.

  18. Method of tissue repair using a composite material

    DOE Patents [OSTI]

    Hutchens, Stacy A; Woodward, Jonathan; Evans, Barbara R; O'Neill, Hugh M

    2014-03-18

    A composite biocompatible hydrogel material includes a porous polymer matrix, the polymer matrix including a plurality of pores and providing a Young's modulus of at least 10 GPa. A calcium comprising salt is disposed in at least some of the pores. The porous polymer matrix can comprise cellulose, including bacterial cellulose. The composite can be used as a bone graft material. A method of tissue repair within the body of animals includes the steps of providing a composite biocompatible hydrogel material including a porous polymer matrix, the polymer matrix including a plurality of pores and providing a Young's modulus of at least 10 GPa, and inserting the hydrogel material into cartilage or bone tissue of an animal, wherein the hydrogel material supports cell colonization in vitro for autologous cell seeding.

  19. Development and validation of bonded composite doubler repairs for commercial aircraft.

    SciTech Connect (OSTI)

    Roach, Dennis Patrick; Rackow, Kirk A.

    2007-07-01

    A typical aircraft can experience over 2,000 fatigue cycles (cabin pressurizations) and even greater flight hours in a single year. An unavoidable by-product of aircraft use is that crack, impact, and corrosion flaws develop throughout the aircraft's skin and substructure elements. Economic barriers to the purchase of new aircraft have placed even greater demands on efficient and safe repair methods. The use of bonded composite doublers offers the airframe manufacturers and aircraft maintenance facilities a cost effective method to safely extend the lives of their aircraft. Instead of riveting multiple steel or aluminum plates to facilitate an aircraft repair, it is now possible to bond a single Boron-Epoxy composite doubler to the damaged structure. The FAA's Airworthiness Assurance Center at Sandia National Labs (AANC), Boeing, and Federal Express completed a pilot program to validate and introduce composite doubler repair technology to the U.S. commercial aircraft industry. This project focused on repair of DC-10 fuselage structure and its primary goal was to demonstrate routine use of this repair technology using niche applications that streamline the design-to-installation process. As composite doubler repairs gradually appear in the commercial aircraft arena, successful flight operation data is being accumulated. These commercial aircraft repairs are not only demonstrating the engineering and economic advantages of composite doubler technology but they are also establishing the ability of commercial maintenance depots to safely adopt this repair technique. This report presents the array of engineering activities that were completed in order to make this technology available for widespread commercial aircraft use. Focused laboratory testing was conducted to compliment the field data and to address specific issues regarding damage tolerance and flaw growth in composite doubler repairs. Fatigue and strength tests were performed on a simulated wing repair using a

  20. Effect of multiple repairs in girth welds of pipelines on the mechanical properties

    SciTech Connect (OSTI)

    Vega, O.E.; Hallen, J.M.; Villagomez, A.

    2008-10-15

    This work presents the results of multiple weld repairs in the same area in seamless API X-52 microalloyed steel pipe. Four conditions of shielded metal arc welding repairs and one as-welded specimen of the girth weld were characterized to determine changes in the microstructure, grain size in the heat affected zone, and to evaluate their effect on the mechanical properties of the weld joints. The mechanical properties by means of tension tests, Charpy-V impact resistance and Vickers hardness of the welds were analyzed. The results indicate that significant changes are not generated in the microstructural constituents of the heat affected zone. Grain growth in the heat affected zone at the specimen mid-thickness with the number of repairs was observed. Tensile strength of the weld joints meets the requirement of the API 1104 standard even after the fourth weld repair. Significant reduction in Charpy-V impact resistance with the number of weld repairs was found when the notch location was in the intersection of the fusion line with the specimen mid-thickness. A significant increase in the Vickers hardness of the heat affected zone occurred after the first repair and a gradual decrease in the Vickers hardness occurred as the number of repairs increases.

  1. CDK1 enhances mitochondrial bioenergetics for radiation-induced DNA repair

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Qin, Lili; Fan, Ming; Candas, Demet; Jiang, Guochun; Papadopoulos, Stelios; Tian, Lin; Woloschak, Gayle; Grdina, David J.; Li, Jian  Jian

    2015-12-06

    Nuclear DNA repair capacity is a critical determinant of cell fate under genotoxic stress conditions. DNA repair is a well-defined energy-consuming process. However, it is unclear how DNA repair is fueled and whether mitochondrial energy production contributes to nuclear DNA repair. Here, we report a dynamic enhancement of oxygen consumption and mitochondrial ATP generation in irradiated normal cells, paralleled with increased mitochondrial relocation of the cell-cycle kinase CDK1 and nuclear DNA repair. The basal and radiation-induced mitochondrial ATP generation is reduced significantly in cells harboring CDK1 phosphorylation-deficient mutant complex I subunits. Similarly, mitochondrial ATP generation and nuclear DNA repair aremore »also compromised severely in cells harboring mitochondrially targeted, kinase-deficient CDK1. These findings demonstrate a mechanism governing the communication between mitochondria and the nucleus by which CDK1 boosts mitochondrial bioenergetics to meet the increased cellular fuel demand for DNA repair and cell survival under genotoxic stress conditions.« less

  2. DNA repair of a single UV photoproduct in a designed nucleosome

    SciTech Connect (OSTI)

    Kosmoskil, Joseph V.; Ackerman, Eric J. ); Smerdon, Michael J.

    2001-08-28

    Eukaryotic DNA repair enzymes must interact with the architectural hierarchy of chromatin. The challenge of finding damaged DNA complexed with histone proteins in nucleosomes is complicated by the need to maintain local chromatin structures involved in regulating other DNA processing events. The heterogeneity of lesions induced by DNA-damaging agents has led us to design homogeneously damaged substrates to directly compare repair of naked DNA with that of nucleosomes. Here we report that nucleotide excision repair in Xenopus nuclear extracts can effectively repair a single UV radiation photoproduct located 5 bases from the dyad center of a positioned nucleosome, although the nucleosome is repaired at about half the rate at which the naked DNA fragment is. Extract repair within the nucleosome is > 50-fold more rapid than either enzymatic photoreversal or endonuclease cleavage of the lesion in vitro. Furthermore, nucleosome formation occurs (after repair) only on damaged naked DNA ( 165-bp fragments) during a 1-h incubation in these extracts, even in the presence of a large excess of undamaged DNA. This is an example of selective nucleosome assembly by Xenopus nuclear extracts on a short linear DNA fragment containing a DNA lesion.

  3. Fabrication Flaw Density and Distribution In Repairs to Reactor Pressure Vessel and Piping Welds

    SciTech Connect (OSTI)

    GJ Schuster, FA Simonen, SR Doctor

    2008-04-01

    The Pacific Northwest National Laboratory is developing a generalized fabrication flaw distribution for the population of nuclear reactor pressure vessels and for piping welds in U.S. operating reactors. The purpose of the generalized flaw distribution is to predict component-specific flaw densities. The estimates of fabrication flaws are intended for use in fracture mechanics structural integrity assessments. Structural integrity assessments, such as estimating the frequency of loss-of-coolant accidents, are performed by computer codes that require, as input, accurate estimates of flaw densities. Welds from four different reactor pressure vessels and a collection of archived pipes have been studied to develop empirical estimates of fabrication flaw densities. This report describes the fabrication flaw distribution and characterization in the repair weld metal of vessels and piping. This work indicates that large flaws occur in these repairs. These results show that repair flaws are complex in composition and sometimes include cracks on the ends of the repair cavities. Parametric analysis using an exponential fit is performed on the data. The relevance of construction records is established for describing fabrication processes and product forms. An analysis of these records shows there was a significant change in repair frequency over the years when these components were fabricated. A description of repair flaw morphology is provided with a discussion of fracture mechanics significance. Fabrication flaws in repairs are characterized using optimized-access, high-sensitivity nondestructive ultrasonic testing. Flaw characterizations are then validated by other nondestructive evaluation techniques and complemented by destructive testing.

  4. Emailed Comments of Elizabeth Chimento RE: Pepco Scheduled Line Repair Dec.

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1-20, 2006 | Department of Energy Emailed Comments of Elizabeth Chimento RE: Pepco Scheduled Line Repair Dec. 1-20, 2006 Emailed Comments of Elizabeth Chimento RE: Pepco Scheduled Line Repair Dec. 1-20, 2006 Docket No. EO-05-01. Regarding the planned line outage, scheduled for Feb. 20 through Mar. 6, I am requesting that the residents near the plant be moved for the duration of the outage to protect their health. Emailed Comments of Elizabeth Chimento RE: Pepco Scheduled Line Repair Dec.

  5. In situ repair of a failed compression fitting

    DOE Patents [OSTI]

    Wolbert, R.R.; Jandrasits, W.G.

    1985-08-05

    A method and apparatus for the in situ repair of a failed compression fitting is provided. Initially, a portion of a guide tube is inserted coaxially in the bore of the compression fitting and locked therein. A close fit dethreading device is then coaxially mounted on the guide tube to cut the threads from the fitting. Thereafter, the dethreading device and guide tube are removed and a new fitting is inserted onto the dethreaded fitting with the body of the new fitting overlaying the dethreaded portion. Finally, the main body of the new fitting is welded to the main body of the old fitting whereby a new threaded portion of the replacement fitting is precisely coaxial with the old threaded portion. If needed, a bushing is located on the dethreaded portion which is sized to fit snugly between the dethreaded portion and the new fitting. Preferably, the dethreading device includes a cutting tool which is moved incrementally in a radial direction whereby the threads are cut from the threaded portion of the failed fitting in increments.

  6. In situ repair of a failed compression fitting

    DOE Patents [OSTI]

    Wolbert, Ronald R.; Jandrasits, Walter G.

    1986-01-01

    A method and apparatus for the in situ repair of a failed compression fitg is provided. Initially, a portion of a guide tube is inserted coaxially in the bore of the compression fitting and locked therein. A close fit dethreading device is then coaxially mounted on the guide tube to cut the threads from the fitting. Thereafter, the dethreading device and guide tube are removed and a new fitting is inserted onto the dethreaded fitting with the body of the new fitting overlaying the dethreaded portion. Finally, the main body of the new fitting is welded to the main body of the old fitting whereby a new threaded portion of the replacement fitting is precisely coaxial with the old threaded portion. If needed, a bushing is located on the dethreaded portion which is sized to fit snugly between the dethreaded portion and the new fitting. Preferably, the dethreading device includes a cutting tool which is moved incrementally in a radial direction whereby the threads are cut from the threaded portion of the failed fitting in increments.

  7. Review of Maintenance and Repair Times for Components in Technological Facilities

    SciTech Connect (OSTI)

    L. C. Cadwallader

    2012-11-01

    This report is a compilation of some unique component repair time data and it also presents citations of more extensive reports where lists of repair times can be found. This collection of information should support analysts who seek to quantify maintainability and availability of high technology and nuclear energy production systems. While there are newer sources of repair time information, most, if not all, of the newer sources are proprietary and cannot be shared. This report offers data that, while older, is openly accessible and can serve as reasonable estimates of repair times, at least for initial studies. Some times were found for maintenance times in radiation environments, and some guidance for multiplicative factors to use to account for work in contamination areas.

  8. Tiny Terminators: New Micro-Robots Assemble, Repair Themselves and Are Surprisingly Strong

    Broader source: Energy.gov [DOE]

    Tiny robots that can assemble and repair themselves? Watch a video of Argonne National Laboratory's micro-robots that easily perform tasks that can challenge other robots, including moving objects that are larger than themselves.

  9. Inducible error-prone repair in B. subtilis. Final report, September 1, 1979-June 30, 1981

    SciTech Connect (OSTI)

    Yasbin, R. E.

    1981-06-01

    The research performed under this contract has been concentrated on the relationship between inducible DNA repair systems, mutagenesis and the competent state in the gram positive bacterium Bacillus subtilis. The following results have been obtained from this research: (1) competent Bacillus subtilis cells have been developed into a sensitive tester system for carcinogens; (2) competent B. subtilis cells have an efficient excision-repair system, however, this system will not function on bacteriophage DNA taken into the cell via the process of transfection; (3) DNA polymerase III is essential in the mechanism of the process of W-reactivation; (4) B. subtilis strains cured of their defective prophages have been isolated and are now being developed for gene cloning systems; (5) protoplasts of B. subtilis have been shown capable of acquiring DNA repair enzymes (i.e., enzyme therapy); and (6) a plasmid was characterized which enhanced inducible error-prone repair in a gram positive organism.

  10. Unmanned deepwater-line repair system passes full-scale trials

    SciTech Connect (OSTI)

    Venzi, S.; Vienna, A. )

    1993-09-06

    The first ever full-scale tests of an unmanned, deepwater-pipeline repair system were successfully conducted last year off the coast of Italy. The Italian gas-transmission company SNAM tested a submersible automatic system (SAS) sealine repair system at a depth of 600 m. The modular SAS allows sealines to be repaired by installation of the Nuovo Pignone mechanical connector. The system's trials simulated complete repair intervention on the 20-in. Trans mediterranean pipeline and provided unprecedented experience to SNAM and to the other involved in this project. The paper discusses the origin of the idea for the SAS, the design of the system, construction and testing, the first sea trials, final deep sea trials, and future developments.

  11. Community-Minded Interns at Savannah River Site Help Area Residents in Need with Home Repairs

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – More than two dozen college interns who worked at the Savannah River Site (SRS) this summer joined other volunteers and headed into area neighborhoods to help people in need with home repairs.

  12. Method to repair localized amplitude defects in a EUV lithography mask blank

    DOE Patents [OSTI]

    Stearns, Daniel G.; Sweeney, Donald W.; Mirkarimi, Paul B.; Chapman, Henry N.

    2005-11-22

    A method and apparatus are provided for the repair of an amplitude defect in a multilayer coating. A significant number of layers underneath the amplitude defect are undamaged. The repair technique restores the local reflectivity of the coating by physically removing the defect and leaving a wide, shallow crater that exposes the underlying intact layers. The particle, pit or scratch is first removed the remaining damaged region is etched away without disturbing the intact underlying layers.

  13. RESTORING A DAMAGED 16-YEAR -OLD INSULATING POLYMER CONCRETE DIKE OVERLAY: REPAIR MATERIALS AND TECHNOLOGIES.

    SciTech Connect (OSTI)

    SUGAMA,T.

    2007-01-01

    The objective of this program was to design and formulate organic polymer-based material systems suitable for repairing and restoring the overlay panels of insulating lightweight polymer concrete (ILPC) from the concrete floor and slope wall of a dike at KeySpan liquefied natural gas (LNG) facility in Greenpoint, Brooklyn, NY, just over sixteen years ago. It also included undertaking a small-scale field demonstration to ensure that the commercial repairing technologies were applicable to the designed and formulated materials.

  14. Laser engineered net shaping (LENS) for the repair and modification of NWC metal components.

    SciTech Connect (OSTI)

    Atwood, Clinton J.; Smugeresky, John E. (Sandia National Labs, Livermore,CA); Gill, David Dennis

    2006-11-01

    Laser Engineered Net Shaping{trademark} (LENS{reg_sign}) is a layer additive manufacturing process that creates fully dense metal components using a laser, metal powder, and a computer solid model. This process has previously been utilized in research settings to create metal components and new material alloys. The ''Qualification of LENS for the Repair and Modification of Metal NWC Components'' project team has completed a Technology Investment project to investigate the use of LENS for repair of high rigor components. The team submitted components from four NWC sites for repair or modification using the LENS process. These components were then evaluated for their compatibility to high rigor weapons applications. The repairs included hole filling, replacement of weld lips, addition of step joints, and repair of surface flaws and gouges. The parts were evaluated for mechanical properties, corrosion resistance, weldability, and hydrogen compatibility. This document is a record of the LENS processing of each of these component types and includes process parameters, build strategies, and lessons learned. Through this project, the LENS process was shown to successfully repair or modify metal NWC components.

  15. Formation and Repair of Tobacco Carcinogen-Derived Bulky DNA Adducts

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Hang, Bo

    2010-01-01

    DNA adducts play a central role in chemical carcinogenesis. The analysis of formation and repair of smoking-related DNA adducts remains particularly challenging as both smokers and nonsmokers exposed to smoke are repetitively under attack from complex mixtures of carcinogens such as polycyclic aromatic hydrocarbons and N -nitrosamines. The bulky DNA adducts, which usually have complex structure, are particularly important because of their biological relevance. Several known cellular DNA repair pathways have been known to operate in human cells on specific types of bulky DNA adducts, for example, nucleotide excision repair, base excision repair, and direct reversal involving O 6more » -alkylguanine DNA alkyltransferase or AlkB homologs. Understanding the mechanisms of adduct formation and repair processes is critical for the assessment of cancer risk resulting from exposure to cigarette smoke, and ultimately for developing strategies of cancer prevention. This paper highlights the recent progress made in the areas concerning formation and repair of bulky DNA adducts in the context of tobacco carcinogen-associated genotoxic and carcinogenic effects.« less

  16. Relocation and repair of the National Geotechnical Centrifuge. Final report

    SciTech Connect (OSTI)

    Cheney, J.A.

    1994-10-01

    In January of 1984, the large geotechnical centrifuge located at NASA Ames Research Center, was in the first stages of operational checkout when the main thrust bearing of the large D.C. drive motor failed. After many months of investigation and proposals for repair of the facility, it became evident that it would be far more advantageous to the engineering community to remove those components of the centrifuge that were undamaged to the Davis campus and replace the drive system completely. The large centrifuge had cost over 2 million dollars to build, and it would have been irresponsible to simply scrap it. Recognizing this fact, funds were solicited and received from various sources, and Beam Engineering Inc. was contracted to design and construct the centrifuge at its new location. The University of California contributed a quarter of a million dollars and Tyndall Air Force Base, through Los Alamos National Laboratory, contributed $140,000. There were funds also contributed by LANL, LLNL, US Navy and NSF. The first stage in the phased development of the newly located centrifuge is nearing completion, which prompts the writing of this report. By the time that this report reaches the reader the first runs of the centrifuge will have been completed. The present report describes the present capability of the centrifuge and the plans for upgrading as time goes on. Several pilot studies were carried out. The experiments involved (1) the effects of nearby explosions on buried thin walled containers and (2) the advection and dispersion of toxic waste water through soils.

  17. Further Evolution of Composite Doubler Aircraft Repairs Through a Focus on Niche Applications

    SciTech Connect (OSTI)

    ROACH,DENNIS P.

    2000-07-15

    The number of commercial airframes exceeding twenty years of service continues to grow. A typical aircraft can experience over 2,000 fatigue cycles (cabin pressurizations) and even greater flight hours in a single year. An unavoidable by-product of aircraft use is that crack and corrosion flaws develop throughout the aircraft's skin and substructure elements. Economic barriers to the purchase of new aircraft have created an aging aircraft fleet and placed even greater demands on efficient and safe repair methods. The use of bonded composite doublers offers the airframe manufacturers and aircraft maintenance facilities a cost effective method to safety extend the lives of their aircraft. Instead of riveting multiple steel or aluminum plates to facilitate an aircraft repair, it is now possible to bond a single Boron-Epoxy composite doubler to the damaged structure. The FAA's Airworthiness Assurance Center at Sandia National Labs (AANC) is conducting a program with Boeing and Federal Express to validate and introduce composite doubler repair technology to the US commercial aircraft industry. This project focuses on repair of DC-10 structure and builds on the foundation of the successful L-1011 door corner repair that was completed by the AANC, Lockheed-Martin, and Delta Air Lines. The L-1011 composite doubler repair was installed in 1997 and has not developed any flaws in over three years of service, As a follow-on effort, this DC-1O repair program investigated design, analysis, performance (durability, flaw containment, reliability), installation, and nondestructive inspection issues. Current activities are demonstrating regular use of composite doubler repairs on commercial aircraft. The primary goal of this program is to move the technology into niche applications and to streamline the design-to-installation process. Using the data accumulated to date, the team has designed, analyzed, and developed inspection techniques for an array of composite doubler repairs

  18. Development of bonded composite doublers for the repair of oil recovery equipment.

    SciTech Connect (OSTI)

    Roach, David W.; Rackow, Kirk A.

    2005-06-01

    An unavoidable by-product of a metallic structure's use is the appearance of crack and corrosion flaws. Economic barriers to the replacement of these structures have created an aging infrastructure and placed even greater demands on efficient and safe repair methods. In the past decade, an advanced composite repair technology has made great strides in commercial aviation use. Extensive testing and analysis, through joint programs between the Sandia Labs FAA Airworthiness Assurance Center and the aviation industry, have proven that composite materials can be used to repair damaged aluminum structure. Successful pilot programs have produced flight performance history to establish the durability of bonded composite patches as a permanent repair on commercial aircraft structures. With this foundation in place, this effort is adapting bonded composite repair technology to civil structures. The use of bonded composite doublers has the potential to correct the difficulties associated with current repair techniques and the ability to be applied where there are no rehabilitation options. It promises to be cost-effective with minimal disruption to the users of the structure. This report concludes a study into the application of composite patches on thick steel structures typically used in mining operations. Extreme fatigue, temperature, erosive, and corrosive environments induce an array of equipment damage. The current weld repair techniques for these structures provide a fatigue life that is inferior to that of the original plate. Subsequent cracking must be revisited on a regular basis. The use of composite doublers, which do not have brittle fracture problems such as those inherent in welds, can help extend the structure's fatigue life and reduce the equipment downtime. Two of the main issues for adapting aircraft composite repairs to civil applications are developing an installation technique for carbon steel and accommodating large repairs on extremely thick structures

  19. INTERNAL REPAIR OF GAS PIPLINES SURVEY OF OPERATOR EXPERIENCE AND INDUSTRY NEEDS REPORT

    SciTech Connect (OSTI)

    Ian D. Harris

    2003-09-01

    A repair method that can be applied from the inside of a gas transmission pipeline (i.e., a trenchless repair) is an attractive alternative to conventional repair methods since the need to excavate the pipeline is precluded. This is particularly true for pipelines in environmentally sensitive and highly populated areas. The objectives of the project are to evaluate, develop, demonstrate, and validate internal repair methods for pipelines; develop a functional specification for an internal pipeline repair system; and prepare a recommended practice for internal repair of pipelines. The purpose of this survey is to better understand the needs and performance requirements of the natural gas transmission industry regarding internal repair. A total of fifty-six surveys were sent to pipeline operators. A total of twenty completed surveys were returned, representing a 36% response rate, which is considered very good given the fact that tailored surveys are known in the marketing industry to seldom attract more than a 10% response rate. The twenty survey responses produced the following principal conclusions: (1) Use of internal weld repair is most attractive for river crossings, under other bodies of water (e.g., lakes and swamps) in difficult soil conditions, under highways, under congested intersections, and under railway crossings. All these areas tend to be very difficult and very costly if, and where, conventional excavated repairs may be currently used. (2) Internal pipe repair offers a strong potential advantage to the high cost of horizontal direct drilling (HDD) when a new bore must be created to solve a leak or other problem in a water/river crossing. (3) The typical travel distances required can be divided into three distinct groups: up to 305 m (1,000 ft.); between 305 m and 610 m (1,000 ft. and 2,000 ft.); and beyond 914 m (3,000 ft.). In concept, these groups require pig-based systems; despooled umbilical systems could be considered for the first two groups

  20. DNA repair decline during mouse spermiogenesis results in the accumulation of heritable DNA damage

    SciTech Connect (OSTI)

    Marchetti, Francesco; Marchetti, Francesco; Wryobek, Andrew J

    2008-02-21

    The post-meiotic phase of mouse spermatogenesis (spermiogenesis) is very sensitive to the genomic effects of environmental mutagens because as male germ cells form mature sperm they progressively lose the ability to repair DNA damage. We hypothesized that repeated exposures to mutagens during this repair-deficient phase result in the accumulation of heritable genomic damage in mouse sperm that leads to chromosomal aberrations in zygotes after fertilization. We used a combination of single or fractionated exposures to diepoxybutane (DEB), a component of tobacco smoke, to investigate how differential DNA repair efficiencies during the three weeks of spermiogenesis affected the accumulation of DEB-induced heritable damage in early spermatids (21-15 days before fertilization, dbf), late spermatids (14-8 dbf) and sperm (7- 1 dbf). Analysis of chromosomalaberrations in zygotic metaphases using PAINT/DAPI showed that late spermatids and sperm are unable to repair DEB-induced DNA damage as demonstrated by significant increases (P<0.001) in the frequencies of zygotes with chromosomal aberrations. Comparisons between single and fractionated exposures suggested that the DNA repair-deficient window during late spermiogenesis may be less than two weeks in the mouse and that during this repair-deficient window there is accumulation of DNA damage in sperm. Finally, the dose-response study in sperm indicated a linear response for both single and repeated exposures. These findings show that the differential DNA repair capacity of post-meioitic male germ cells has a major impact on the risk of paternally transmitted heritable damage and suggest that chronic exposures that may occur in the weeks prior to fertilization because of occupational or lifestyle factors (i.e, smoking) can lead to an accumulation of genetic damage in sperm and result in heritable chromosomal aberrations of paternal origin.

  1. DNA Repair Decline During Mouse Spermiogenesis Results in the Accumulation of Heritable DNA Damage

    SciTech Connect (OSTI)

    Marchetti, Francesco; Marchetti, Francesco; Wyrobek, Andrew J.

    2007-12-01

    The post-meiotic phase of mouse spermatogenesis (spermiogenesis) is very sensitive to the genomic effects of environmental mutagens because as male germ cells form mature sperm they progressively lose the ability to repair DNA damage. We hypothesized that repeated exposures to mutagens during this repair-deficient phase result in the accumulation of heritable genomic damage in mouse sperm that leads to chromosomal aberrations in zygotes after fertilization. We used a combination of single or fractionated exposures to diepoxybutane (DEB), a component of tobacco smoke, to investigate how differential DNA repair efficiencies during the three weeks of spermiogenesis affected the accumulation of DEB-induced heritable damage in early spermatids (21-15 days before fertilization, dbf), late spermatids (14-8 dbf) and sperm (7-1 dbf). Analysis of chromosomal aberrations in zygotic metaphases using PAINT/DAPI showed that late spermatids and sperm are unable to repair DEB-induced DNA damage as demonstrated by significant increases (P<0.001) in the frequencies of zygotes with chromosomal aberrations. Comparisons between single and fractionated exposures suggested that the DNA repair-deficient window during late spermiogenesis may be less than two weeks in the mouse and that during this repair-deficient window there is accumulation of DNA damage in sperm. Finally, the dose-response study in sperm indicated a linear response for both single and repeated exposures. These findings show that the differential DNA repair capacity of post-meioitic male germ cells has a major impact on the risk of paternally transmitted heritable damage and suggest that chronic exposures that may occur in the weeks prior to fertilization because of occupational or lifestyle factors (i.e, smoking) can lead to an accumulation of genetic damage in sperm and result in heritable chromosomal aberrations of paternal origin.

  2. S. 42: A Bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil and refined petroleum products. Introduced in the Senate of the United States, One Hundredth First Congress, First Session, January 25, 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    S. 42 is a bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil and refined petroleum products.

  3. Patient Compliance with Surveillance Following Elective Endovascular Aneurysm Repair

    SciTech Connect (OSTI)

    Godfrey, Anthony D. Morbi, Abigail H. M. Nordon, Ian M.

    2015-10-15

    PurposeIntegral to maintaining good outcomes post-endovascular aneurysm repair (EVAR) is a robust surveillance protocol. A significant proportion of patients fail to comply with surveillance, exposing themselves to complications. We examine EVAR surveillance in Wessex (UK), exploring factors that may predict poor compliance.MethodsRetrospective analysis of 179 consecutive elective EVAR cases [2008–2013] was performed. 167 patients were male, with the age range of 50–95. Surveillance was conducted centrally (tertiary referral trauma centre) and at four spoke units. Surveillance compliance and predictors of non-compliance including age, gender, co-morbid status, residential location and socioeconomic status were analysed for univariate significance.ResultsFifty patients (27.9 %) were non-compliant with surveillance; 14 (8.1 %) had no imaging post-EVAR. At 1 year, 56.1 % (of 123 patients) were compliant. At years 2 and 3, 41.5 and 41.2 % (of 65 and 34 patients, respectively) were compliant. Four years post-EVAR, only one of eight attended surveillance (12.5 %). There were no statistically significant differences in age (p = 0.77), co-morbid status or gender (p = 0.64). Distance to central unit (p = 0.67) and surveillance site (p = 0.56) was non-significant. While there was a trend towards compliance in upper-middle-class socioeconomic groups (ABC1 vs. C1C2D), correlating with >50 % of non-compliant patients living within <10 mile radius of the central unit, overall predictive value was not significant (p = 0.82).ConclusionsCompliance with surveillance post-EVAR is poor. No independent predictor of non-compliance has been confirmed, but socioeconomic status appears to be relevant. There is a worrying drop-off in attendance beyond the first year. This study highlights a problem that needs to be addressed urgently, if we are to maintain good outcomes post-EVAR.

  4. Working report and instruction for repairing of three peaces of wings from a 30 kW Riisagermill

    SciTech Connect (OSTI)

    Ethelfeld, J.; Jensen, F.; Kjoller, J.; Lystrup, A.

    1980-01-01

    This report is made to give the owners of Riisager windmills an instruction to make service and repair of the fiber glass wings.

  5. HANFORD SITE LOW EXPOSURE PIPELINE REPAIR USING A NON-METALLIC COMPOSITE SYSTEM

    SciTech Connect (OSTI)

    HUTH RJ

    2009-11-12

    At the Department of Energy, Richland Operations (DOE-RL) Hanford site in eastern Washington, a 350 mm (14 inch) diameter high density polyethylene (HDPE) pump recirculation pipeline failed at a bonded joint adjacent to a radiologically and chemically contaminated groundwater storage basin. The responsible DOE-RL contractor, CH2MHill Plateau Remediation Company, applied a fiberglass reinforced plastic (composite) field repair system to the failed joint. The system was devised specifically for the HDPE pipe repair at the Hanford site, and had not been used on this type of plastic piping previously. This paper introduces the pipe failure scenario, describes the options considered for repair and discusses the ultimate resolution of the problem. The failed pipeline was successfully returned to service with minimal impact on waste water treatment plant operating capacity. Additionally, radiological and chemical exposures to facility personnel were maintained as low as reasonably achievable (ALARA). The repair is considered a success for the near term, and future monitoring will prove whether the repair can be considered for long term service and as a viable alternative for similar piping failures at the Hanford site.

  6. Fabrication Flaw Density and Distribution in the Repairs of Reactor Pressure Vessels

    SciTech Connect (OSTI)

    Schuster, George J.; Doctor, Steven R.; Simonen, Fredric A.

    2006-02-15

    The Pacific Northwest National Laboratory (PNNL) is developing a generalized flaw size and density distribution for the population of U.S. reactor pressure vessels (RPVs). The purpose of the generalized flaw distribution is to predict vessel specific flaw rates for use in probabilistic fracture mechanics calculations that estimate vessel failure probability. Considerable progress has been made on the construction of an engineering data base of fabrication flaws in U.S. nuclear RPVs. The fabrication processes and product forms used to construct U.S. RPVs are represented in the data base. A validation methodology has been developed for characterizing the flaws for size, shape, orientation, and composition. The relevance of construction records has been established for describing fabrication processes and product forms. The fabrication flaws were detected in material removed from cancelled nuclear power plants using high sensitivity nondestructive ultrasonic testing, and validated by other nondestructive evaluation (NDE) techniques, and complemented by destructive testing. This paper describes research that has generated data on welding flaws, which indicated that the largest flaws occur in weld repairs. Recent research results confirm that repair flaws are complex in composition and may include cracks on the repair ends. Section III of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code for nuclear power plant components requires radiographic examinations (RT) of welds and requires repairs for RT indications that exceed code acceptable sizes. PNNL has previously obtained the complete construction records for two RPVs. Analysis of these records show a significant change in repair frequency.

  7. Alternatives Analysis Amchitka Island Mud Pit Cap Repair, Amchitka, Alaska January 2016

    SciTech Connect (OSTI)

    Darr, Paul S.

    2016-01-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) manages the Nevada Offsites program, which includes a series of reclaimed drilling mud impoundments on Amchitka Island, Alaska (Figure 1). Navarro Research and Engineering, Inc. is the Legacy Management Support contractor (the Contractor) for LM. The Contractor has procured Tetra Tech, Inc. to provide engineering support to the Amchitka mud pit reclamation project. The mud pit caps were damaged during a 7.9-magnitude earthquake that occurred in 2014. The goals of the current project are to investigate conditions at the mud pit impoundments, identify feasible alternatives for repair of the cover systems and the contents, and estimate relative costs of repair alternatives. This report presents descriptions of the sites and past investigations, existing conditions, summaries of various repair/mitigation alternatives, and direct, unburdened, order-of-magnitude (-15% to +50%) associated costs.

  8. A survey of repair practices for nuclear power plant containment metallic pressure boundaries

    SciTech Connect (OSTI)

    Oland, C.B.; Naus, D.J.

    1998-05-01

    The Nuclear Regulatory Commission has initiated a program at the Oak Ridge National Laboratory to provide assistance in their assessment of the effects of potential degradation on the structural integrity and leaktightness of metal containment vessels and steel liners of concrete containments in nuclear power plants. One of the program objectives is to identify repair practices for restoring metallic containment pressure boundary components that have been damaged or degraded in service. This report presents issues associated with inservice condition assessments and continued service evaluations and identifies the rules and requirements for the repair and replacement of nonconforming containment pressure boundary components by welding or metal removal. Discussion topics include base and welding materials, welding procedure and performance qualifications, inspection techniques, testing methods, acceptance criteria, and documentation requirements necessary for making acceptable repairs and replacements so that the plant can be returned to a safe operating condition.

  9. Automatic coke oven heating control system at Burns Harbor for normal and repair operation

    SciTech Connect (OSTI)

    Battle, E.T.; Chen, K.L.

    1997-12-31

    An automatic heating control system for coke oven batteries was developed in 1985 for the Burns Harbor No. 1 battery and reported in the 1989 Ironmaking Conference Proceedings. The original system was designed to maintain a target coke temperature at a given production level under normal operating conditions. Since 1989, enhancements have been made to this control system so that it can also control the battery heating when the battery is under repair. The new control system has improved heating control capability because it adjusts the heat input to the battery in response to anticipated changes in the production schedule. During a recent repair of this 82 oven battery, the pushing schedule changed from 102 ovens/day to 88 ovens/day, then back to 102 ovens/day, then to 107 ovens/day. During this repair, the control system was able to maintain the coke temperature average standard deviation at 44 F, with a maximum 75 F.

  10. Evaluation of bisphenol E cyanate ester for the resin-injection repair of advanced composites

    SciTech Connect (OSTI)

    Wilber Yaote Lio

    2009-12-19

    This thesis is a compilation of a general introduction and literature review that ties together the subsequent chapters which consist of two journal articles that have yet to be submitted for publication. The overall topic relates to the evaluation and application of a new class of cyanate ester resin with unique properties that lend it applicable to use as a resin for injection repair of high glass transition temperature polymer matrix composites. The first article (Chapter 2) details the evaluation and optimization of adhesive properties of this cyanate ester and alumina nanocomposites under different conditions. The second article (Chapter 3) describes the development and evaluation of an injection repair system for repairing delaminations in polymer matrix composites.

  11. Remote reactor repair: GTA (gas tungsten Arc) weld cracking caused by entrapped helium

    SciTech Connect (OSTI)

    Kanne, W.R. Jr.

    1988-01-01

    A repair patch was welded to the wall of a nuclear reactor tank using remotely controlled thirty-foot long robot arms. Further repair was halted when gas tungsten arc (GTA) welds joining type 304L stainless steel patches to the 304 stainless steel wall developed toe cracks in the heat-affected zone (HAZ). The role of helium in cracking was investigated using material with entrapped helium from tritium decay. As a result of this investigation, and of an extensive array of diagnostic tests performed on reactor tank wall material, helium embrittlement was shown to be the cause of the toe cracks.

  12. Bosh repairs No. 3 blast furnace, Edgar Thomson Plant Mon Valley Works

    SciTech Connect (OSTI)

    Stoupis, M.G.

    1993-01-01

    The paper describes in detail the steps taken from quenching to dry out of the furnace to repair the bosh area of the No.3 blast furnace. Inspection of the area revealed that there was no brick anywhere in the bosh. Brick in the tuyere breast area had been peeled back to reveal the steel plate, and descaling revealed 14 pipes fully exposed. None were leaking, but one seemed badly deteriorated. Conventional repairs could not take place before the scheduled blow-in. Installation of coolers were instead tried.

  13. Hot repair of ceramic burner on hot blast stoves at USS/Kobe`s {number_sign}3 blast furnace

    SciTech Connect (OSTI)

    Bernarding, T.F.; Chemorov, M.; Shimono, S.; Phillips, G.R.

    1997-12-31

    During the 1992 reline of the No. 3 blast furnace, three new stoves were constructed. The design of the stoves, equipped with internal ceramic burners, was for providing a hot blast temperature of 2,000 F at a wind rate of 140,000 SCFM. After 3 years the performance had deteriorated so the burners were cleaned. When a second cleaning did not improve the performance of No. 3 blast furnace, it was decided to repair the refractory while still hot. The paper describes the hot repair procedures, taking a stove off for repairs, maintenance heat up during repairs, two stove operation, stove commissioning, repair of a ceramic burner, and wet gas prevention.

  14. General Merchandise 2009 TSD Chicago Low Plug Load 50% Energy...

    Open Energy Info (EERE)

    90.1 2004 Model Year 2009 IDF file http:apps1.eere.energy.govbuildingsenergyplusmodelsMiami2009TSDGeneralMerchLPL50percent.idf XML file http:apps1.eere.energy.gov...

  15. General Merchandise 2009 TSD Miami Low Plug Load Baseline | Open...

    Open Energy Info (EERE)

    90.1 2004 Model Year 2009 IDF file http:apps1.eere.energy.govbuildingsenergyplusmodelsMiami2009TSDGeneralMerchLPLbaseline.idf XML file http:apps1.eere.energy.gov...

  16. General Merchandise 2009 TSD Chicago Low Plug Load Baseline ...

    Open Energy Info (EERE)

    90.1 2004 Model Year 2009 IDF file http:apps1.eere.energy.govbuildingsenergyplusmodelsMiami2009TSDGeneralMerchLPLBaseline.idf XML file http:apps1.eere.energy.gov...

  17. General Merchandise 2009 TSD Miami High Plug Load 50% Energy...

    Open Energy Info (EERE)

    90.1 2004 Model Year 2009 IDF file http:apps1.eere.energy.govbuildingsenergyplusmodelsMiami2009TSDGeneralMerchHPL50percent.idf XML file http:apps1.eere.energy.gov...

  18. General Merchandise 2009 TSD Chicago High Plug Load 50% Energy...

    Open Energy Info (EERE)

    90.1 2004 Model Year 2009 IDF file http:apps1.eere.energy.govbuildingsenergyplusmodelsChicago2009TSDGeneralMerchHPL50percent.idf XML file http:apps1.eere.energy.gov...

  19. General Merchandise 2009 TSD Chicago High Plug Load Baseline...

    Open Energy Info (EERE)

    90.1 2004 Model Year 2009 IDF file http:apps1.eere.energy.govbuildingsenergyplusmodelsChicago2009TSDGeneralMerchHPLBaseline.idf XML file http:apps1.eere.energy.gov...

  20. General Merchandise 2009 TSD Miami High Plug Load Baseline |...

    Open Energy Info (EERE)

    90.1 2004 Model Year 2009 IDF file http:apps1.eere.energy.govbuildingsenergyplusmodelsMiami2009TSDGeneralMerchHPLbaseline.idf XML file http:apps1.eere.energy.gov...

  1. DNA repair efficiency in germ cells and early mouse embryos and consequences for radiation-induced transgenerational genomic damage

    SciTech Connect (OSTI)

    Marchetti, Francesco; Wyrobek, Andrew J.

    2009-01-18

    Exposure to ionizing radiation and other environmental agents can affect the genomic integrity of germ cells and induce adverse health effects in the progeny. Efficient DNA repair during gametogenesis and the early embryonic cycles after fertilization is critical for preventing transmission of DNA damage to the progeny and relies on maternal factors stored in the egg before fertilization. The ability of the maternal repair machinery to repair DNA damage in both parental genomes in the fertilizing egg is especially crucial for the fertilizing male genome that has not experienced a DNA repair-competent cellular environment for several weeks prior to fertilization. During the DNA repair-deficient period of spermatogenesis, DNA lesions may accumulate in sperm and be carried into the egg where, if not properly repaired, could result in the formation of heritable chromosomal aberrations or mutations and associated birth defects. Studies with female mice deficient in specific DNA repair genes have shown that: (i) cell cycle checkpoints are activated in the fertilized egg by DNA damage carried by the sperm; and (ii) the maternal genotype plays a major role in determining the efficiency of repairing genomic lesions in the fertilizing sperm and directly affect the risk for abnormal reproductive outcomes. There is also growing evidence that implicates DNA damage carried by the fertilizing gamete as a mediator of postfertilization processes that contribute to genomic instability in subsequent generations. Transgenerational genomic instability most likely involves epigenetic mechanisms or error-prone DNA repair processes in the early embryo. Maternal and embryonic DNA repair processes during the early phases of mammalian embryonic development can have far reaching consequences for the genomic integrity and health of subsequent generations.

  2. Multilayer sulfur-resistant composite metal membranes and methods of making and repairing the same

    DOE Patents [OSTI]

    Way, J. Douglas; Hatlevik, Oyvind

    2014-07-15

    The invention relates to thin, hydrogen-permeable, sulfur-resistant membranes formed from multi-layers of palladium or palladium-alloy coatings on porous, ceramic or metal supports, methods of making these membranes, methods of repairing layers of these membranes and devices that incorporate these membranes.

  3. Repair of localized defects in multilayer-coated reticle blanks for extreme ultraviolet lithography

    DOE Patents [OSTI]

    Stearns, Daniel G.; Sweeney, Donald W.; Mirkarimi, Paul B.

    2004-11-23

    A method is provided for repairing defects in a multilayer coating layered onto a reticle blank used in an extreme ultraviolet lithography (EUVL) system. Using high lateral spatial resolution, energy is deposited in the multilayer coating in the vicinity of the defect. This can be accomplished using a focused electron beam, focused ion beam or a focused electromagnetic radiation. The absorbed energy will cause a structural modification of the film, producing a localized change in the film thickness. The change in film thickness can be controlled with sub-nanometer accuracy by adjusting the energy dose. The lateral spatial resolution of the thickness modification is controlled by the localization of the energy deposition. The film thickness is adjusted locally to correct the perturbation of the reflected field. For example, when the structural modification is a localized film contraction, the repair of a defect consists of flattening a mound or spreading out the sides of a depression.

  4. Subterranean barriers, methods, and apparatuses for forming, inspecting, selectively heating, and repairing same

    DOE Patents [OSTI]

    Nickelson, Reva A.; Sloan, Paul A.; Richardson, John G.; Walsh, Stephanie; Kostelnik, Kevin M.

    2009-04-07

    A subterranean barrier and method for forming same are disclosed, the barrier including a plurality of casing strings wherein at least one casing string of the plurality of casing strings may be affixed to at least another adjacent casing string of the plurality of casing strings through at least one weld, at least one adhesive joint, or both. A method and system for nondestructively inspecting a subterranean barrier is disclosed. For instance, a radiographic signal may be emitted from within a casing string toward an adjacent casing string and the radiographic signal may be detected from within the adjacent casing string. A method of repairing a barrier including removing at least a portion of a casing string and welding a repair element within the casing string is disclosed. A method of selectively heating at least one casing string forming at least a portion of a subterranean barrier is disclosed.

  5. Endovascular Repair of a Ruptured Mycotic Aneurysm of the Common Iliac Artery

    SciTech Connect (OSTI)

    Mofidi, R. Bhat, R.; Nagy, J.; Griffiths, G. D.; Chakraverty, S.

    2007-09-15

    This report describes the case of a ruptured mycotic aneurysm of the left common iliac artery, successfully treated with endovascular stent-grafting. A 64-year-old woman underwent diagnostic coronary angiography complicated by an infected hematoma of the left groin. Seven days later, she developed methicillin-resistant Staphylococcus aureus septicemia and CT scan evidence of perivascular inflammation around the left common iliac artery. This was followed by rupture of a mycotic aneurysm of the left common iliac artery. The lesion was successfully treated with a stent-graft and prolonged antibiotic therapy, and the patient remains free of infection 10 months later. Accumulating evidence suggests that endovascular repair can be used safely for the repair of ruptured infected aneurysms.

  6. Multiphasic survival curves for cells of human tumor cell lines: Induced repair or hypersensitive subpopulation?

    SciTech Connect (OSTI)

    Lambin, P. ||; Fertil, B.; Malaise, E.P.; Joiner, M.C.

    1994-04-01

    Survival of the cells of three human tumor cell lines of differing radiosensitivity was measured after irradiation with single doses of X rays (0.05-5 Gy). At doses below 1 Gy, cells were more radiosensitive than predicted by back-extrapolating the high-dose response. This difference was more marked for cells of the radioresistant cell lines than the radiosensitive cell line so that the {open_quotes}true{close_quotes} initial slopes of the survival curves, at very low doses, were similar for the cells of the three cell lines. This phenomenon could reflect an induced radioresistance so that low doses of X rays are more effective per gray than higher doses, because only at higher doses is there sufficient damage to trigger repair systems or other radioprotective mechanisms which can then act during the time course for repair of DNA injury. 35 refs., 2 figs.

  7. Weld Repair of a Stamped Pressure Vessel in a Radiologically Controlled Zone

    SciTech Connect (OSTI)

    Cannell, Gary L.; Huth, Ralph J.; Hallum, Randall T.

    2013-08-26

    In September 2012 an ASME B&PVC Section VIII stamped pressure vessel located at the DOE Hanford Site Effluent Treatment Facility (ETF) developed a through-wall leak. The vessel, a steam/brine heat exchanger, operated in a radiologically controlled zone (by the CH2MHill PRC or CHPRC), had been in service for approximately 17 years. The heat exchanger is part of a single train evaporator process and its failure caused the entire system to be shut down, significantly impacting facility operations. This paper describes the activities associated with failure characterization, technical decision making/planning for repair by welding, logistical challenges associated with performing work in a radiologically controlled zone, performing the repair, and administrative considerations related to ASME code requirements.

  8. To: Mansueti, Lawrence Subject: RE: Pepco Scheduled Line Repair Dec. 1-20, 2006

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    From: ecchimento@comcast.net [mailto:ecchimento@comcast.net] Sent: Monday, January 29, 2007 6:28 PM To: Mansueti, Lawrence Subject: RE: Pepco Scheduled Line Repair Dec. 1-20, 2006 Larry, Regarding the planned line outage, scheduled for Feb. 20 through Mar. 6, I am requesting that the residents near the plant be moved for the duration of the outage to protect their health. Would you include this comment also in the ongoing recorded discussion? Thank you. Elizabeth -----Original Message-----

  9. Analysis and testing of the DIII-D ohmic heating coil lead repair clamp

    SciTech Connect (OSTI)

    Reis, E.E.; Anderson, P.M.; Chin, E.; Robinson, J.I.

    1997-11-01

    DIII-D has been operating for the last year with limited volt-second capabilities due to structural failure of a conductor lead to one of the ohmic heating (OH) solenoids. The conductor failure was due to poor epoxy impregnation of the overwrap of the lead pack, resulting in copper fatigue and a water leak. A number of structural analyses were performed to assist in determining the failure scenario and to evaluate various repair options. A fatigue stress analysis of the leads with a failed epoxy overwrap indicated crack initiation after 1,000 cycles at the maximum operating conditions. The failure occurred in a very inaccessible area which restricted design repair options to concepts which could be implemented remotely. Several design options were considered for repairing the lead so that it can sustain the loads for 7.5 Vs conditions at full toroidal field. A clamp, along with preloaded banding straps and shim bags, provides a system that guarantees that the stress at the crack location is always compressive and prevents further crack growth in the conductor. Due to the limited space available for the repair, it was necessary to design the clamp system to operate at the material yield stress. The primary components of the clamp system were verified by load tests prior to installation. The main body of the clamp contains a load cell and potentiometer for monitoring the load-deflection characteristics of the clamp and conductors during plasma operation. Strain gages provides redundant instrumentation. If required, the preload on the conductors can be increased remotely by a special wrench attached to the clamp assembly.

  10. Inhibition of Hsp27 Radiosensitizes Head-and-Neck Cancer by Modulating Deoxyribonucleic Acid Repair

    SciTech Connect (OSTI)

    Guttmann, David M.; Hart, Lori; Du, Kevin; Seletsky, Andrew; Koumenis, Constantinos

    2013-09-01

    Purpose: To present a novel method of tumor radiosensitization through Hsp27 knockdown using locked nucleic acid (LNA) and to investigate the role of Hsp27 in DNA double strand break (DSB) repair. Methods and Materials: Clonogenic survival assays, immunoblotting, the proximity ligation assay, and ?H2AX foci analysis were conducted in SQ20B and FaDu human head-and-neck cancer cell lines treated with Hsp27 LNA and Hsp27 short hairpin RNA (shRNA). Additionally, nude mice with FaDu flank tumors were treated with fractionated radiation therapy after pretreatment with Hsp27 LNA and monitored for tumor growth. Results: Hsp27 LNA and Hsp27 shRNA radiosensitized head-and-neck cancer cell lines in an Hsp27-dependent manner. Ataxia-Telangectasia Mutated-mediated DNA repair signaling was impaired in irradiated cells with Hsp27 knockdown. ATM kinase inhibition abrogated the radiosensitizing effect of Hsp27. Furthermore, Hsp27 LNA and shRNA both attenuated DNA repair kinetics after radiation, and Hsp27 was found to colocalize with ATM in both untreated and irradiated cells. Last, combined radiation and Hsp27 LNA treatment in tumor xenografts in nude mice suppressed tumor growth compared with either treatment alone. Conclusions: These results support a radiosensitizing property of Hsp27 LNA in vitro and in vivo, implicate Hsp27 in double strand break repair, and suggest that Hsp27 LNA might eventually serve as an effective clinical agent in the radiotherapy of head-and-neck cancer.