Powered by Deep Web Technologies
Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Water pollution Control Permit Fee Schedules (West Virginia) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

pollution Control Permit Fee Schedules (West Virginia) pollution Control Permit Fee Schedules (West Virginia) Water pollution Control Permit Fee Schedules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Siting and Permitting Provider Department of Environmental Protection This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national

2

Underground Injection Control Fee Schedule (West Virginia) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Injection Control Fee Schedule (West Virginia) Injection Control Fee Schedule (West Virginia) Underground Injection Control Fee Schedule (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Provider Department of Environmental Protection This rule establishes schedules of permit fees for state under-ground injection control permits issued by the Chief of the Office of Water Resources. This rule applies to any person who is required to apply for and

3

SCHEDULE OF FEES Wet Milling  

E-Print Network (OSTI)

SCHEDULE OF FEES Wet Milling 100 g.......................$120..per sample* 1 kilogram of Illinois offers five milling procedures to determine processing characteristics of corn. Laboratory times. WET MILLING The wet milling process is used to produce starch (99.6% purity) as the primary

Illinois at Urbana-Champaign, University of

4

Solid Waste Assessment Fee Exemptions (West Virginia) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solid Waste Assessment Fee Exemptions (West Virginia) Solid Waste Assessment Fee Exemptions (West Virginia) Solid Waste Assessment Fee Exemptions (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Rebate Program A person who owns, operates, or leases an approved solid waste disposal facility is exempt from the payment of solid waste assessment fees, upon the receipt of a Certificate of Exemption from the director, if that

5

File:Geothermal fee schedule 08-08-10.pdf | Open Energy Information  

Open Energy Info (EERE)

fee schedule 08-08-10.pdf fee schedule 08-08-10.pdf Jump to: navigation, search File File history File usage File:Geothermal fee schedule 08-08-10.pdf Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 33 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 20:19, 16 November 2012 Thumbnail for version as of 20:19, 16 November 2012 1,650 × 1,275 (33 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:Geothermal_fee_schedule_08-08-10.pdf&oldid=537711"

6

fees  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PRIME CONTRACTOR FEES ON PRIME CONTRACTOR FEES ON SUBCONTRACTOR COSTS U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES AUDIT REPORT DOE/IG-0427 SEPTEMBER 1998 September 11, 1998 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Acting Inspector General SUBJECT: INFORMATION : Audit Report on "The U.S. Department of Energy's Prime Contractor Fees on Subcontractor Costs" BACKGROUND In Fiscal Year 1996, the Department's prime contractors awarded $5.3 billion in subcontracts. The purpose of this audit was to determine if the Department adjusted the fee bases of prime contractors to reflect the actual effort necessary to manage the technical and administrative activities of their subcontractors.

7

HAMILTON MIDDLETOWN WEST CHESTER APPLY ONLINE OR SCHEDULE A CAMPUS VISIT: MiamiOH.edu/regionals/admission  

E-Print Network (OSTI)

MIAMI 2012-13 HAMILTON · MIDDLETOWN · WEST CHESTER APPLY ONLINE OR SCHEDULE A CAMPUS VISIT: Miami in Hamilton, Middletown, and West Chester. YOU CAN PREPARE -- and prepare well -- for relocation to the Oxford campuses in Middletown and Hamilton to make Miami's top-notch education accessible, affordable

Dollar, Anna

8

Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedules Schedules Schedules Print Current Long-Term Operating Schedule August-December 2013 Upcoming Long-Term Operating Schedule January-July 2014 New! ALS Operating Schedule on Google Calendar Past Long-Term Operating Schedules January-July 2013 July-December 2012 January-June 2012 July-December 2011 January-June 2011 July-December 2010 January-June 2010 July-December 2009 January-June 2009 July-December 2008 January-June 2008 July-December 2007 February-June 2007 July 2006-February 2007 January-June 2006 July-December 2005 January-June 2005 June-December 2004 December 2003-May 2004 June 2003-November 2003 December 2002-May 2003 June 2002-November 2002 December 2001-May 2002 May 2001-December 2001 January 2001-April 2001 July 2000-December 2000 January 2000-June 2000 April 1999-December 1999

9

FOIA FEES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fees Fees The FOIA generally requires that requestors pay fees for processing their requests. If costs associated with the processing of a FOIA request are $15.00 or less, no fees are charged. Each FOIA request is reviewed for the purpose of placing a requestor in one of four fee categories described below: 1. Commercial use requestor: Responsible for all direct costs; i.e. search for responsive documents, review of documents located for responsiveness; 16% administrative costs; reproduction cost of $.05 per page; and the time it took the FOIA Contact Person to process the request. 2. Requestors who are representative of the news media: Responsible for reproduction costs after the first 100 pages. 3. Educational and non-commercial scientific institution requestors:

10

120 Check www.uaf.edu/schedule/ for changes to classes, regulations and fees. Area code is 907. FarmersLoopRoad  

E-Print Network (OSTI)

. TROTH YEDDHA' PARK FarmersLoopRoad West Valley Plaza 4001 Geist Road, Suite 6 - Advancement Services

Wagner, Diane

11

A computerized student fee system for Texas A&M University  

E-Print Network (OSTI)

options 12 12 15 3. 2 Initial f e assessment 3. 3 Fee update procedures 18 3. 3. 1 Normal fee revisions 3. 3. 2 Drop/add fee revisions 3. 3. 3 Processing fee payments 4. S UMK4R Y REFERENCES 21 23 25 26 30 APPENDIX A Program Operating..., but the production of revised fee state- ments is postponed until after the twelfth class day. 3. $. 2 Dro add fee revisions. Other fee revisions are made neces- sary by the student's adding and/or dropping of courses after the original schedule and fee statement...

Wood, Lester Seth

2012-06-07T23:59:59.000Z

12

Student Health Service Fee Student Center Fee  

E-Print Network (OSTI)

Student Health Service Fee Student Center Fee Graduate Recreation Fee Registration Fee International Student Service Fee Level Masters Doctorial Graduate Fall 2014/Spring 2015 (Amounts reflect the amount charged per semester) GR Full-Time (Registered 9 Credits/Semester or Contracted Student) GR Part

Firestone, Jeremy

13

New Student Orientation Student Health Service Fee  

E-Print Network (OSTI)

New Student Orientation Fee Student Health Service Fee Student Center Fee Student Comprehensive Fee Registration Fee International Student Service Fee Fall 2014 Spring 2015 $516 $599 Student Teaching Fee Lab Fee Descriptions This is a one-time fee charged to all new undergraduate students in order to support

Firestone, Jeremy

14

Student services fee The student services fee is distributed  

E-Print Network (OSTI)

Student services fee The student services fee is distributed among various student programs that are listed online, along with their amounts, at onestop.umn.edu/finances/costs_and_ tuition/tuition_and_fees/student_ser- vice_fees.html). If you are enrolled for 6 or more credits, you must pay a student services fee of $368

Amin, S. Massoud

15

Student services fee The student services fee is distributed  

E-Print Network (OSTI)

Student services fee The student services fee is distributed among various student programs that are listed online, along with their amounts, at onestop.umn.edu/finances/costs_and_ tuition/tuition_and_fees/student_ser- vice_fees.html). If you are enrolled for 6 or more credits, you must pay a student services fee of $414

Amin, S. Massoud

16

1. Preconstruction Phase Payments Preconstruction Phase fees are negotiated as a lump sum amount, with fees being associated with individual  

E-Print Network (OSTI)

, if any), and are to be submitted to the Facilities Design and Construction Office (FDC). If any by the schedule of values. Fee and General Conditions Pay Request Documentation: a) The overhead and profit in writing from the FSU project manager. Line item amounts from the GMP for salaries shall not be exceeded

Sura, Philip

17

Fee Title: Renewable Energy Fee Measure #: Measure 44  

E-Print Network (OSTI)

Fee Title: Renewable Energy Fee Measure #: Measure 44 Ballot Information Shall the undergraduates and graduate students of UCSC amend Measure 28, the Renewable Energy fee passed in Spring 2006 as follows Student Association. This measure will also allow the reserve money to be spent on energy efficiency

California at Santa Cruz, University of

18

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Period: Fee Information Maximum Fee Contract Type: Minimum Fee 91,085,394 74,386,573 Target Fee September 2002 - March 2017 Cost Plus Fixed FeeIncentive Fee 1,192,114,896...

19

Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Period Period Total Fee Paid 4/29/2012 - 9/30/2012 $418,348 10/1/2012 - 9/30/2013 $0 10/1/2013 - 9/30/2014 $0 10/1/2014 - 9/30/2015 $0 10/1/2015 - 9/30/2016 $0 Cumulative Fee Paid $418,348 Contract Type: Cost Plus Award Fee Contract Period: $116,769,139 November 2011 - September 2016 $475,395 $0 Fee Information Total Estimated Contract Cost $1,141,623 $1,140,948 $1,140,948 $5,039,862 $1,140,948 Maximum Fee $5,039,862 Minimum Fee Fee Available Portage, Inc. DE-DT0002936 EM Contractor Fee Site: MOAB Uranium Mill Tailings - MOAB, UT Contract Name: MOAB Uranium Mill Tailings Remedial Action Contract September 2013 Contractor: Contract Number:

20

The Schedule  

Directives, Delegations, and Requirements

The schedule is one of the building blocks for project development. A schedule helps determine the duration of the project, the critical activities, and when funds are required. This chapter will briefly discuss some scheduling basics.

1997-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Contractor Fee Payments - Carlsbad Field Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Contractor Fee Payments - Carlsbad Field Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to...

22

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

FY2010 FY2011 FY2012 Fee Information Minimum Fee Maximum Fee June 2014 Contract Number: Cost Plus Incentive Fee Contractor: 3,245,814,927 Contract Period: EM Contractor Fee Site:...

23

RL's Fiscal Year 2013 Fee Evaluation Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

Award Period: October 2012 through September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 21,030,647 Award Fee Earned:...

24

EM Contractor Fee Payments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Fee Payments Contractor Fee Payments EM Contractor Fee Payments In the interest of furthering transparency in its government operations, the Department of Energy's Office of Environmental Management (EM) herein is releasing information relating to fee payments under its major cost-reimbursable contracts. Charts delineating fees that are paid under cost-plus-award-fee (CPAF), cost-plus-incentive-fee (CPIF), and cost-plus-fixed-fee (CPFF) contracts are listed by site location in the following hyperlinks. With CPFF contracts, the fee is negotiated and fixed at the inception of the contract. The fixed fee will not vary with the actual costs that the contractor incurs. In general, the contractor earns fee either by completing the work called for in the contract or devoting a specified

25

Data:2e38fe09-4eea-422f-920a-505fee2618bb | Open Energy Information  

Open Energy Info (EERE)

9-4eea-422f-920a-505fee2618bb 9-4eea-422f-920a-505fee2618bb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule ID Small Industrial Service - Demand Metered 35 to 499 kW Sector: Industrial Description: Applicability This schedule applies to: 1) commercial and industrial customers for general power use with a demand of 35 kW to 499 kW, and 2) other services where other Rate Schedules (other than Rate Schedules NM and SG) do not apply. This schedule is applicable on an annual basis only. Power Factor Charge, per kVAr $ 1.10

26

Rate Schedules  

Energy.gov (U.S. Department of Energy (DOE))

One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate...

27

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

- Oak Ridge, TN Contract Name: Transuranic Waste Processing Contract June, 2014 2,433,940 Cost Plus Award Fee 150,664,017 Fee Information Minimum Fee 2,039,246 Maximum Fee...

28

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Number: Contract Type: Contract Period: 0 Minimum Fee Maximum Fee Washington River Protection Solutions LLC DE-AC27-08RV14800 Cost Plus Award Fee 5,553,789,617 Fee Information...

29

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This...

30

FEDERAL LOAN FEES (Fees are deducted by the U.S. Department Of Education prior to disbursement)  

E-Print Network (OSTI)

Loan Fees A fee of 1.0% is fee assessed with an up-front fee rebate of 0.5%, resulting in a net fee of 0.5% deducted from the gross disbursement. The rebate remains in effect for all borrowers who make of the rebate is added back to the borrower's principal. Federal PLUS Loan Fees A fee of 4.0% is fee assessed

Fernandez, Eduardo

31

STUDENT SERVICES FEE ASSESSMENT REQUEST To elect to pay the Student Services Fee, fill out the form completely and return  

E-Print Network (OSTI)

STUDENT SERVICES FEE ASSESSMENT REQUEST DIRECTIONS To elect to pay the Student Services Fee, fill the Student Services Fee, you may elect to pay the fee to use or support the services covered by the fee. You of the Student Services Fee. If you are enrolled in the Senior Citizen Education Program, Regents' Scholarship

Amin, S. Massoud

32

WIPP Revised Fee Chart.xlsx  

Office of Environmental Management (EM)

6,008,123 6,008,123 * Final Fee Determination is pending. EM Contractor Fee Site: Carlsbad Field Office - Carlsbad, NM Contract Name: Waste Isolation Pilot Plant Operations...

33

Contractor Fee Payments- Portsmouth Paducah Project Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Portsmouth Paducah Project Office on these charts.

34

Contractor Fee Payments- Office of River Protection  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Office of River Protection on these charts.

35

Contractor Fee Payments- Savannah River Site Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts.

36

Contractor Fee Payments- Richland Operations Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Richland Operations Office on these charts.

37

SI Group Scheduling Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Personnel On-Call Page Beamline Validation Schedule Group Organizational Chart Reviews Presentations Group Scheduling Page Project Scheduling Information Ops Scheduling Info Project / Scheduling Info APS fy2005 Annual Schedule ( html ) PSS Validation Schedule APS fy2006 Annual Schedule (html) PSS Validation Teams Latest Machine Studies Schedule (pdf) (html) New Builds Schedule (For SI GROUP Reference Only) Parasitic Beam Operations Schedule Ops Scheduling Page Shutdown Information Work Schedules August/September Shutdown Shutdown Work List Validation Schedule Safety Info Work Request Links ISM Core Functions Enter / Search Work Requests APS Safety Page Modify / Approve Work Requests Radiation Safety Policy APS TMS Training Profiles MSDS Search This page maintained by Joe Budz

38

Rate schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Firm Power Service Provided by Rate/Charges Firm Power Service Provided by Rate/Charges Rate/Charges Effective Through (or until superceded) Firm Sales (SLIP-F9) Composite Rate SLIP 29.62 mills/kWh 9/30/2015 Demand Charge SLIP $5.18/kW-month 9/30/2015 Energy Charge SLIP 12.19 mills/kWh 9/30/2015 Cost Recovery Charge (CRC) SLIP 0 mills/kWh 9/30/2015 Transmission Service Provided by Current Rates effective10/12 - 9/15 (or until superceded) Rate Schedule Effective Through Firm Point-to-Point Transmission (SP-PTP7) CRSP $1.14 per kW-month $13.69/kW-year $0.00156/kW-hour $0.04/kW-day $0.26/kW-week 10/1/2008-9/30/2015 Network Integration Transmission (SP-NW3) CRSP see rate schedule 10/1/2008-9/30/2015 Non-Firm Point-to-Point Transmission (SP-NFT6) CRSP see rate schedule 10/1/2008-9/30/2015 Ancillary Services Provided by Rate Rate Schedule

39

Total Estimated Contract Cost:) Performance Period Total Fee...  

Office of Environmental Management (EM)

Washington Closure LLC DE-AC06-05RL14655 Contractor: Contract Number: Contract Type: Cost Plus Incentive Fee 2,251,328,348 Fee Information 0 Maximum Fee 337,699,252...

40

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

0 Contractor: Bechtel National Inc. Contract Number: DE-AC27-01RV14136 Contract Type: Cost Plus Award Fee Maximum Fee* 595,123,540 Fee Available 102,622,325 10,714,819,974...

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

LLC (UCOR) DE-SC-0004645 April 29, 2011 - July 13, 2016 Contract Number: Maximum Fee Cost Plus Award Fee 16,098,142 EM Contractor Fee Site: Oak Ridge Office - Oak Ridge, TN...

42

Contractor Fee Payments - Oak Ridge Operations | Department of...  

Office of Environmental Management (EM)

Oak Ridge Operations Contractor Fee Payments - Oak Ridge Operations See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to...

43

Alternative Fuels Data Center: Electric Vehicle (EV) Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fee to someone by E-mail Fee to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Electric Vehicle (EV) Fee EV operators must pay an annual vehicle registration renewal fee of $100. This fee expires if the legislature imposes a vehicle miles traveled fee or

44

ALA-1-N Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina This rate schedule shall be available to the PowerSouth Energy Cooperative. This rate schedule shall be applicable to power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters, and Richard B. Russell Projects and sold under contract between the Cooperative and the Government. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B. Russell Projects. Document Available for Download ALA-1-N Rate Schedule More Documents & Publications MISS-1-N Wholesale Power Rate Schedule

45

Water Pollution Fee (Michigan) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Pollution Fee (Michigan) Water Pollution Fee (Michigan) Water Pollution Fee (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Michigan Program Type Fees Siting and Permitting Provider Department of Environmental Quality The Groundwater Program regulates discharge to groundwater under Part 31, Water Resources Protection, of the Natural Resources and Environmental Protection Act, 1994 PA 451 and Part 22 Rules. Groundwater staff review

46

UCOR Contract & Fee Determination | Department of Energy  

Energy Savers (EERE)

Contract & Fee Determination The attached document is UCOR's conformed contract with the Oak Ridge Office of Environmental Managment. It is contract DE-SC0004645, and it includes...

47

Presentation Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Presentation Schedule Presentation Schedule (30 Min) Dave Wade - Dose Comparisons of once-thru and closed fuel cycles. (30 Min) Ralph Bennett - Roadmap Overview (15 Min) Neil Todreas - GRNS Perspectives and Recommendations (75 Min) Neil Todreas / - NERAC DISCUSSION Sal Levy 2 Generation IV Roadmap NERAC Subcommittee (GRNS) Bobby Abrams* Duke Engineering Douglas Chapin MPR Associates B. John Garrick Independent Consultant Dan Kammen University of California- Berkeley 3 Salomon Levy ** Levy & Associates Ted Marston Electrical Power Research Institute Bill Naughton Exelon Neil Todreas ** Massachusetts Institute of Technology * Resigned, July 2002 ** Co-chair GRNS Recruited Working Group Co-Chairs Jack Devine TWG-1 Water Cooled Phil Hildebrandt TWG-2 Gas Cooled Steve Rosen TWG-3 Metal Cooled Bill Rasin

48

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain...  

Office of Environmental Management (EM)

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's...

49

Shifts & Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Shifts & Schedules This page provides links to the various shifts and schedules that are used by the User ESH Support Group. FC Shift Schedule This page lists the current Operational Shift Schedule for the Floor Coordinators. FC DOR Schedule This page lists the current DOR Schedule for the Floor Coordinators. FC Off Shift Pager Schedule This tool lists the current schedule for the Floor Coordinator carring the 0101 during APS Shutdown periods. Long Range Operations Schedule This page lists the schedule of Operations for the current APS fiscal year. Machine Studies Schedule This page lists the current schedule of Operations for the Accelerator Systems during Machine Studies. PSS Validation Schedule This page lists the beamlines currently scheduled to have their Personnel Safety Systems validated.

50

"MBUF Demo" "Mn Road Fee Test"  

E-Print Network (OSTI)

(40 mpg) Electric Vehicle (non-gas powered) State Tax * Federal Tax ** State Tax * Federal Tax"MBUF Demo" "Mn Road Fee Test" "IntelliDrive Connected Vehicles for Safety, Mobility and User Fee Overview Six Months In-Vehicle Data Collection Participant Recruited Equipment Deployed First Odometer

Minnesota, University of

51

Performance Period Total Fee Paid FY2008  

Office of Environmental Management (EM)

Type: Maximum Fee 3,129,570 175,160 377,516 1,439,287 Fee Available 175,160 80,871 Accelerated Remediation Company (aRc) DE-AT30-07CC60013 Contractor: Contract Number:...

52

WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE DOE F 4220.23 (06-95) U.S. DEPARTMENT OF ENERGY 1. CONTRACTOR IDENTIFICATION 2. TYPE OF ACQUISTION ACTION (REFER TO OFPP MANUAL, FEDERAL PROCUREMENT DATA SYSTEMS - PRODUCT AND SERVICE CODES. APRIL 1980) a. Name c. Street address b. Division (If any) d. City e. State f. Zip code a. SUPPLIES & EQUIPMENT b. RESEARCH & DEVELOPMENT c. SERVICES: (1) ARCHITECT-ENGINEER: (2) MANAGEMENT SERVICES: (3) MEDICAL: (4) OTHER (e.g., SUPPORT SERVICES) 3. ACQUISITION INFORMATION a. Purchasing Offices b. Contract type d. FY c. RFP/RFQ No. e. Contract No. PROFIT/FEE OBJECTIVE COMPUTATION PROFIT/FEE CONSIDERATIONS a. MEASUREMENT BASE b. PROFIT/FEE WEIGHT RANGES (%) c. ASSIGNED

53

Water Use Fees (Wisconsin) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Use Fees (Wisconsin) Water Use Fees (Wisconsin) Water Use Fees (Wisconsin) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Program Info Start Date 2011 State Wisconsin Program Type Fees Provider Department of Natural Resources Annual $125 water use fees are charged by the State of Wisconsin to each property that has the capacity to withdraw 100,000 gallons per day or more

54

_PART I - THE SCHEDULE  

NLE Websites -- All DOE Office Websites (Extended Search)

OPTION: SAVANNAH RIVER TRITIUM OPERATIONS (SRTO) ................. 3 OPTION: SAVANNAH RIVER TRITIUM OPERATIONS (SRTO) ................. 3 CLIN 0001H WORK FOR OTHERS/OTHER REIMBURSABLE WORK ............................. 4 CLIN 0002 URANIUM PROCESSING FACILITY (UPF) PROJECT MANAGEMENT........ 5 B-1 CONTRACT TYPE AND VALUE ............................................................................... 6 B-2 CONTRACT FEE STRUCTURES ............................................................................... 6 B-3 SINGLE FEE ............................................................................................................. 10 B-4 KEY PERSONNEL REPLACEMENT ....................................................................... 10 B-5 OBLIGATION OF FUNDS ....................................................................................... 11

55

Duke-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted and scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

56

Santee-3-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Santee-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

57

Santee-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule Santee-1-E Wholesale Power Rate Schedule Area: Central, Bamberg, and Georgetown System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

58

Duke-4-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina served through the transmission facilities of Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

59

DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS  

E-Print Network (OSTI)

, VMT fee, data processing, fuel tax alternatives, fee collection center, customer service center 18DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS by Robert L. Bertini Kerri-based fee collection centers, including the identification of issues related to data transmission, data

Bertini, Robert L.

60

Hanford Facility Highlights EM's Success in Meeting Cost and Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Highlights EM's Success in Meeting Cost and Facility Highlights EM's Success in Meeting Cost and Schedule Targets Hanford Facility Highlights EM's Success in Meeting Cost and Schedule Targets August 1, 2012 - 12:00pm Addthis EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System this month. EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System this month. An aerial view of the 200 West Pump and Treat System at the Hanford site. An aerial view of the 200 West Pump and Treat System at the Hanford site. EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System this month.

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Hanford Facility Highlights EM's Success in Meeting Cost and Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Facility Highlights EM's Success in Meeting Cost and Hanford Facility Highlights EM's Success in Meeting Cost and Schedule Targets Hanford Facility Highlights EM's Success in Meeting Cost and Schedule Targets August 1, 2012 - 12:00pm Addthis EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System this month. EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System this month. An aerial view of the 200 West Pump and Treat System at the Hanford site. An aerial view of the 200 West Pump and Treat System at the Hanford site. EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System this month.

62

Alternative Fuels Data Center: Fleet User Fee Exemption  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fleet User Fee Fleet User Fee Exemption to someone by E-mail Share Alternative Fuels Data Center: Fleet User Fee Exemption on Facebook Tweet about Alternative Fuels Data Center: Fleet User Fee Exemption on Twitter Bookmark Alternative Fuels Data Center: Fleet User Fee Exemption on Google Bookmark Alternative Fuels Data Center: Fleet User Fee Exemption on Delicious Rank Alternative Fuels Data Center: Fleet User Fee Exemption on Digg Find More places to share Alternative Fuels Data Center: Fleet User Fee Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fleet User Fee Exemption Fleets with 10 or more vehicles located in defined areas of the state must pay an annual user fee of $20 per vehicle. Owners of electric vehicles and

63

Performance Period Total Fee Paid FY2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 01 $4,547,400 FY2002 $4,871,000 FY2003 $6,177,902 FY2004 $8,743,007 FY2005 $13,134,189 FY2006 $7,489,704 FY2007 $9,090,924 FY2008 $10,045,072 FY2009 $12,504,247 FY2010 $17,590,414 FY2011 $17,558,710 FY2012 $14,528,770 Cumulative Fee Paid $126,281,339 Cost Plus Award Fee DE-AC29-01AL66444 Washington TRU Solutions LLC Contractor: Contract Number: Contract Type: $8,743,007 Contract Period: $1,813,482,000 Fee Information Maximum Fee $131,691,744 Total Estimated Contract Cost: $4,547,400 $4,871,000 $6,177,902 October 2000 - September 2012 Minimum Fee $0 Fee Available EM Contractor Fee Site: Carlsbad Field Office - Carlsbad, NM Contract Name: Waste Isolation Pilot Plant Operations March 2013 $13,196,690 $9,262,042 $10,064,940 $14,828,770 $12,348,558 $12,204,247 $17,590,414 $17,856,774

64

Nuclear Waste Fund fee adequacy: An assessment  

SciTech Connect

The purpose of this report is to present the Department of Energy`s (the Department) analysis of the adequacy of the 1.00 mill per kilowatt-hour (kWh) fee being paid by the utilities generating nuclear power for the permanent disposal of their spent nuclear fuel (SNF). In accordance with the Nuclear Waste Policy Act (NWPA), the SNF would be disposed of in a geologic repository to be developed by the Department. An annual analysis of the fee`s adequacy is required by the NWPA.

NONE

1990-11-01T23:59:59.000Z

65

Carbon Dioxide Sequestration (West Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dioxide Sequestration (West Virginia) Dioxide Sequestration (West Virginia) Carbon Dioxide Sequestration (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Environmental Regulations Fees Safety and Operational Guidelines Siting and Permitting The purpose of this law is to: Establish a legal and regulatory framework for the permitting of carbon dioxide sequestration operations; Designate a state agency responsible for establishing standards and

66

Implementing Lottery Scheduling: Matching the Specializations in Traditional Schedulers  

E-Print Network (OSTI)

present in traditional non- real time process schedulers. Lottery scheduling enables flexible control over this while maintaining lottery scheduling's flexible control over relative execution rates and loadImplementing Lottery Scheduling: Matching the Specializations in Traditional Schedulers David

67

West Valley  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Facility Nuclear Facility Coalition on West Valley Nuclear Wastes PO Box 603 Springville NY 14141 WV-DigItUp@roadrunner.com Joanne Hameister CFMT (Concentrator Feed Make-up Tank) Packaged 13'x14'x19' 177.5 tons MFHT (Melter Feed Hold Tank) Packaged 13'x14'x16' 152.5 tons WIR Shipments pending to LLW facility MELTER 10'x10'x10' Packaged: 14'x13'x13' 159 tons 4,570 Curies Waste Categories High-Level Waste Based on source * Nuclear Fuel * Reprocessing * TRU Low-Level Waste Not Low Risk Complex classification based on * Nuclide inventory * Half-life(s) * Quantity * Decay products Background Radiation 1978 - average was 100 mRem per person 2011 - BRC* estimate 620 mRem per person Naturally occurring radioactive elements Additions accumulate - from fall-out,

68

West Valley  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Facility Nuclear Facility Coalition on West Valley Nuclear Wastes PO Box 603 Springville NY 14141 WV-DigItUp@roadrunner.com Joanne Hameister CFMT (Concentrator Feed Make-up Tank) Packaged 13'x14'x19' 177.5 tons MFHT (Melter Feed Hold Tank) Packaged 13'x14'x16' 152.5 tons WIR Shipments pending to LLW facility MELTER 10'x10'x10' Packaged: 14'x13'x13' 159 tons 4,570 Curies Waste Categories High-Level Waste Based on source * Nuclear Fuel * Reprocessing * TRU Low-Level Waste Not Low Risk Complex classification based on * Nuclide inventory * Half-life(s) * Quantity * Decay products Background Radiation 1978 - average was 100 mRem per person 2011 - BRC* estimate 620 mRem per person Naturally occurring radioactive elements Additions accumulate - from fall-out,

69

Annual Emission Fees (Michigan) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Emission Fees (Michigan) Annual Emission Fees (Michigan) Annual Emission Fees (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Michigan Program Type Fees Provider Department of Environmental Quality The Renewable Operating Permit (ROP) is required by Title V of the Clean Air Act Amendments of 1990. The ROP program clarifies the requirements that apply to a facility that emits air contaminants. Any facility in Michigan

70

Sacramento Ordinance to Waive Solar PV Fees  

Energy.gov (U.S. Department of Energy (DOE))

This is an ordinance by the city of Sacramento to suspend for the calendar years 2007-2009 all fees related to installation of photovoltaic systems on existing residences.

71

Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Inefficient Fuel Inefficient Vehicle Fee to someone by E-mail Share Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Facebook Tweet about Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Twitter Bookmark Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Google Bookmark Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Delicious Rank Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Digg Find More places to share Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fuel Inefficient Vehicle Fee New passenger vehicles meeting one of the following criteria are subject to an additional fee payable to the New Jersey Motor Vehicle Commission:

72

Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle (EV) Electric Vehicle (EV) Registration Fee to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Electric Vehicle (EV) Registration Fee The annual registration fee for an EV is $25.00 unless the vehicle is more

73

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Annual Fee to someone by E-mail Annual Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) Annual Fee Owners of compressed natural gas and propane powered vehicles are required

74

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT This Fiscal Year 2008 Civilian Radioactive Waste Management Fee Adequacy Letter Report presents an evaluation of the adequacy of the one mill per kilowatt-hour fee paid by commercial nuclear power generators for the permanent disposal of their spent nuclear fuel by the Government. This evaluation recommends no fee change. CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT More Documents & Publications FY 2007 Fee Adequacy, Pub 2008 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear

75

Alternative Fuels Data Center: Ethanol Production Facility Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Production Ethanol Production Facility Fee to someone by E-mail Share Alternative Fuels Data Center: Ethanol Production Facility Fee on Facebook Tweet about Alternative Fuels Data Center: Ethanol Production Facility Fee on Twitter Bookmark Alternative Fuels Data Center: Ethanol Production Facility Fee on Google Bookmark Alternative Fuels Data Center: Ethanol Production Facility Fee on Delicious Rank Alternative Fuels Data Center: Ethanol Production Facility Fee on Digg Find More places to share Alternative Fuels Data Center: Ethanol Production Facility Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Production Facility Fee The cost to submit an air quality permit application for an ethanol production plant is $1,000. An annual renewal fee is also required for the

76

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

77

MISS-1-N Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association System: Georgia-Alabama-South Carolina This rate schedule shall be available to the South Mississippi Electric Power Association (hereinafter called the Customer) to whom power may be wheeled pursuant to contracts between the Government and PowerSouth Energy Cooperative (hereinafter called PowerSouth). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

78

SOCO-3-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule SOCO-3-E Wholesale Power Rate Schedule Area: MEAG, Dalton System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

79

Santee-4-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule Santee-4-E Wholesale Power Rate Schedule Area: Santee-Cooper System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina served through the transmission facilities of South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B.

80

Duke-3-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be scheduled pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer.

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Duke-2-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in North Carolina and South Carolina to whom power may be transmitted pursuant to contracts between the Government and Duke Energy Company (hereinafter called the Company) and the Customer. The Customer is responsible for providing a scheduling arrangement with the Government. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

82

Santee-2-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule Santee-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter call the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and South Carolina Public Service Authority (hereinafter called the Authority). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

83

SOCO-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule SOCO-1-E Wholesale Power Rate Schedule Area: AMEA, Unaffil AL Munis and Coops, Hampton, East Miss., SMEPA off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted and scheduled pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F.

84

Building Operations 2329 West Mall  

E-Print Network (OSTI)

Apply Audio Video & Gaming Products $0.00 Rice Cookers Service Fees May Apply Portable Audio Video $0

Handy, Todd C.

85

DOE Administrative Records Schedules Changes | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administrative Records Schedules Changes DOE Administrative Records Schedules Changes Changes posted to Administrative Records Schedules DOE Administrative Records Schedules...

86

March 29, 2008 OS:CPU Scheduling 1 CPU Scheduling  

E-Print Network (OSTI)

control of the CPU to the process selected by the short-term scheduler. Its function involves: SwitchingMarch 29, 2008 OS:CPU Scheduling 1 CPU Scheduling #12;March 29, 2008 OS:CPU Scheduling 2 Objectives Basic Concepts + Scheduling Criteria + Scheduling Algorithms + Scheduling Algorithm Evaluation + Summary

Adam, Salah

87

West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE))

West Valley Demonstration Project compliance agreements, along with summaries of the agreements, can be viewed here.

88

WEST VIRGINIA ECONOMIC OUTLOOK  

E-Print Network (OSTI)

WEST VIRGINIA ECONOMIC OUTLOOK 2009 BUREAU OF BUSINESS AND ECONOMIC RESEARCH College of Business and Economics West Virginia University #12;West Virginia Economic Outlook 2009 George W. Hammond, Associate Director, BBER, and Associate Professor of Economics West Virginia Economic Outlook 2009 is published

Mohaghegh, Shahab

89

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy Savers (EERE)

Wastren-EnergX Mission Support LLC Contract Number: DE-CI0000004 Contract Type: Cost Plus Award Fee 128,879,762 Contract Period: December 2009 - July 2015 Fee Information...

90

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy Savers (EERE)

Cumulative Fee Paid 22,200,285 Wackenhut Services, Inc. DE-AC30-10CC60025 Contractor: Cost Plus Award Fee 989,000,000 Contract Period: Contract Type: January 2010 - December...

91

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy Savers (EERE)

& Wilcox Conversion Services, LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee EM Contractor Fee June, 2014 Site: Portsmouth Paducah Project Office...

92

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

2011 - September 2015 June 2014 Contractor: Contract Number: Contract Type: Idaho Treatment Group LLC DE-EM0001467 Cost Plus Award Fee Fee Information 419,202,975 Contract Period:...

93

SUMMARY OF FEE EARNED IN FY14 (2).xlsx  

NLE Websites -- All DOE Office Websites (Extended Search)

PERFORMANCE-BASED INCENTIVES Metric 1 MAXIMUM FEE FOR METRIC 1 - 2,644,671 Cubic Meter No. of Units Fee Earned 1.a For each cubic meter of CH waste disposed at WIPP in...

94

FY 2007 Fee Adequacy, Pub 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fee Adequacy, Pub 2008 The purpose of this U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of...

95

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Type: Cost Plus Award Fee 4,104,318,749 28,500,000 31,597,837 0 39,171,018 32,871,600 EM Contractor Fee Site: Savannah River Site Office - Aiken, SC Contract Name:...

96

Alternative Fuels Data Center: Alternative Fuels Tax or Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuels Tax Alternative Fuels Tax or Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuels Tax or Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuels Tax or Fee A state excise tax applies to special fuels at a rate of $0.25 per gallon on a gasoline gallon equivalent basis. Special fuels include compressed

97

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuel Alternative Fuel Vehicle (AFV) User Fee Study to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) User Fee Study

98

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Parking Fee Exemption to someone by E-mail Parking Fee Exemption to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

99

Disposition Schedules | Department of Energy  

Office of Environmental Management (EM)

Disposition Schedules Disposition Schedules The DOE Records Disposition Schedules provide the authority for the transfer, or disposal of records created and maintained by the...

100

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Fee Paid 127,390,991 Contract Number: Fee Available Contract Period: Contract Type: Cost Plus Award Fee 4,104,318,749 28,500,000 31,597,837 0 39,171,018 32,871,600 EM...

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

UCF TECHNOLOGY FEE GUIDELINES Academic Year 2013-2014  

E-Print Network (OSTI)

UCF TECHNOLOGY FEE GUIDELINES Academic Year 2013-2014 The 2007 Florida Legislature amended Florida Statutes, Section 1009.24, to establish "a technology fee of up to 5 percent of the tuition per credit hour to enhance instructional technology resources for students and faculty." UCF TECHNOLOGY FEE COMMITTEE Revenue

Foroosh, Hassan

102

DEVELOPMENT IMPACT FEE ADOPTION AND ITS EFFECTS IN TEXAS  

E-Print Network (OSTI)

The purpose of my thesis is to study what factors affect the adoption of impact fees in Texas and what effects impact fees have on city budgets. This research was done using two models. The first model looked at the adoption of impact fees...

Ambs, Jonathan G.

2010-01-20T23:59:59.000Z

103

FirstEnergy (West Penn Power) - Residential Energy Efficiency Rebate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Penn Power) - Residential Energy Efficiency West Penn Power) - Residential Energy Efficiency Rebate Program FirstEnergy (West Penn Power) - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Heat Pumps Commercial Lighting Lighting Water Heating Maximum Rebate Room AC/Room AC Recycling: Limit 3 All Other Appliances: Limit 1 per household Program Info State Pennsylvania Program Type Utility Rebate Program Rebate Amount Walk-Through Audit: Reduced customer fee of $50 Whole House Audit: $300 CFL's: $1.50 Clothes Washer: $75 Refrigerator: $50 Freezer: $25 Room AC: $25 Dehumidifiers: $10 Refrigerator Recycling: $50 Freezer Recycling: $50 Room AC Unit Recycling: $25

104

SSRL- Experimental Run Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

FY2008 Experimental Run Schedules 2008 Run Ends August 11, 2008. User Operations will resume November 2008. Operating Maintenance Beam Line Schedule FY2009 FY2008 X-ray (1-4,...

105

SRI2007 Conference - Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Home Registration Abstract Submission Proceedings Manuscript Review Conference Schedule Poster Session Satellite Workshops Conference Committee Accommodations Vendors Travel tips...

106

SOCO-2-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule SOCO-2-E Wholesale Power Rate Schedule Area: PowerSouth Off-System System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida to whom power may be transmitted pursuant to contracts between the Government and Southern Company Services, Incorporated (hereinafter called the Company) and the Customer. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

107

SOCO-4-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule SOCO-4-E Wholesale Power Rate Schedule Area: OPC System: Georgia-Alabama-South Carolina This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Georgia, Alabama, Mississippi, and Florida served through the transmission facilities of Southern Company Services, Inc. (hereinafter called the Company) or the Georgia Integrated Transmission System. This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects (hereinafter referred to collectively as the Projects) and sold under appropriate contracts between

108

Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle (EV) Electric Vehicle (EV) Registration Fee Reduction to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

109

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

$ 3,422,994.00 $ 3,422,994.00 FY2011 4,445,142.00 $ FY2012 $ 5,021,951.68 FY2013 $ 3,501,670.00 FY2014 $0 FY2015 $0 FY2016 $0 FY2017 $0 FY2018 $0 FY2019 $0 Cumulative Fee Paid $16,391,758 Wackenhut Services, Inc. DE-AC30-10CC60025 Contractor: Cost Plus Award Fee $989,000,000 Contract Period: Contract Type: January 2010 - December 2019 Contract Number: EM Contractor Fee Site: Savannah River Site Office - Aiken, SC Contract Name: Comprehensive Security Services September 2013 Fee Information Maximum Fee $55,541,496 $5,204,095 $3,667,493 $5,041,415 Minimum Fee 0 Fee Available $5,428,947 $6,326,114

110

Management Controls over Performance Fees in the Idaho National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Controls over Performance Fees in the Idaho National Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 The Department of Energy (Department) did not always effectively and Fees use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures and fees for Fiscal Year (FY) 2005, which were disproportionately high for the work performed. Four of the 49 measures and fees established for FY 2006 provided the contractor the opportunity to earn $1 million under similar circumstances. Also, some of the performance measures worth $460,000, were implemented well

111

Data:Fee5325b-2393-4aed-86b0-ccd004b1eb6f | Open Energy Information  

Open Energy Info (EERE)

Fee5325b-2393-4aed-86b0-ccd004b1eb6f Fee5325b-2393-4aed-86b0-ccd004b1eb6f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barron, Wisconsin (Utility Company) Effective date: 2009/07/15 End date if known: Rate name: Gs-2 General Service-Optional Time-of-Day Single Phase Sector: Commercial Description: Application: This rate schedule is optional to all Gs-1, General Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Fixed Monthly Charge includes Commitment to Community Rider: $3.00 per customer per month

112

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments  

E-Print Network (OSTI)

container; 2) slide mailer 1) Refrigerate. Ship in insulated container with ice pack. 2) Not required *May-3) Refrigerate. Ship in insulated container with ice pack. 4) Not required *May qualify for New York State container 1-3) Refrigerate. Ship in insulated container with ice pack For more information, see Appendix

Keinan, Alon

113

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments  

E-Print Network (OSTI)

sterile container; 2) slide mailer 1) Refrigerate. Ship in insulated container with ice pack. 2) Slide mailer 1-3) Refrigerate. Ship in insulated container with ice pack. 4) Not required *May qualify; 3) sterile container 1-3) Refrigerate. Ship in insulated container with ice pack For more

Keinan, Alon

114

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments  

E-Print Network (OSTI)

container; 2) slide mailer 1) Refrigerate. Ship in insulated container with ice pack. 2) Not required *May container 1-3) Refrigerate. Ship in insulated container with ice pack For more information, see Appendix Freeze. Ship in insulated container with ice packs. Plasma must be separated from cells and frozen within

Keinan, Alon

115

Appendix D - Federal Highway User Fees  

NLE Websites -- All DOE Office Websites (Extended Search)

D - FEDERAL HIGHWAY USER FEES D - FEDERAL HIGHWAY USER FEES FEDERAL HIGHWAY-USER FEES 1/ OCTOBER 2001 TABLE FE-21B USER FEE TAX RATE DISTRIBUTION OF TAX EFFECTIVE DATE HIGHWAY TRUST FUND LEAKING UNDER- GROUND STORAGE TANK TRUST FUND GENERAL FUND HIGHWAY ACCOUNT MASS TRANSIT ACCOUNT Fuel Taxes (Cents per Gallon) Gasoline 18.3 01/01/96 12 2 - 4.3 18.4 10/01/97 15.44 2.86 0.1 - Diesel and Kerosene fuel 24.3 01/01/96 18 2 - 4.3 24.4 10/01/97 21.44 2.86 0.1 - Special fuels 2/ 3/ 18.3 01/01/96 12 2 - 4.3 Liquefied Petroleum Gas 13.6 10/01/97 11.47 2.13 - - Liquefied Natural Gas 11.9 10/01/97 10.04 1.86 - - Other Special Fuels 18.4 10/01/97 15.44 2.86 0.1 - Neat alcohol (85% alcohol) 3/ 4/ 9.25 10/01/97 7.72 1.43 0.1 - Compressed natural gas 5/ 4.3 10/01/93 - - - 4.3

116

Special Fees Help Document Updated 8/23/12 Page 1 of 9  

E-Print Network (OSTI)

Special Fees Help Document ­ Updated 8/23/12 Page 1 of 9 Special Fees Request Form Help Document Affairs ­ Special Fee Forms section, select add new. #12;Special Fees Help Document ­ Updated 8/23/12 Page. Click Next to continue. #12;Special Fees Help Document ­ Updated 8/23/12 Page 3 of 9 Complete the course

Farritor, Shane

117

Data:0acb8b74-4485-4e48-bfd0-fee4784244df | Open Energy Information  

Open Energy Info (EERE)

acb8b74-4485-4e48-bfd0-fee4784244df acb8b74-4485-4e48-bfd0-fee4784244df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Grays Harbor Cnty Effective date: 2013/01/01 End date if known: Rate name: RESIDENTIAL Sector: Residential Description: This schedule is available in all territory served by the District, for electric service for single-family residential and associated purposes. Examples include: Permanent homes, mobile homes, recreational vehicles, residential outbuildings, residential swimming pools, water pumping (excluding non-commercial farm irrigation, and multiple residence water pumping greater than five horsepower.) and individually metered apartments or rental units including building hall lights, air conditioning, water heating, space heating and laundry facilities therein.

118

Data:D727248f-ee36-4ca8-8fb3-e9d93f575de0 | Open Energy Information  

Open Energy Info (EERE)

7248f-ee36-4ca8-8fb3-e9d93f575de0 7248f-ee36-4ca8-8fb3-e9d93f575de0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mitchell Electric Member Corp Effective date: End date if known: Rate name: SCHEDULE LLS-14 Sector: Description: AVAILABILITY Throughout the Cooperative's service area from existing lines of adequate capacity in accordance with the Service Rules and Regulations and subject to the execution of a written agreement for service between the Cooperative and the consumer. Service under this schedule is not available for temporary, standby, or breakdown service or for parallel operation.

119

Data:Fee0631d-1763-440b-9014-ac4cd388a9e2 | Open Energy Information  

Open Energy Info (EERE)

Fee0631d-1763-440b-9014-ac4cd388a9e2 Fee0631d-1763-440b-9014-ac4cd388a9e2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Utility District No 2 Effective date: 2011/10/01 End date if known: Rate name: Small Commercial Single Phase Sector: Commercial Description: This schedule is applicable to SMALL commercial and other services not eligible under other rate schedules where measured demand is less than 50 kW. Commercial accounts are billed on a regular monthly cycle. Power Cost Adjustment Factor = 7% The Power Cost Adjustment is based on rate adjustments from BPA . Minimum Charge Single Phase - $ 21.00 per meter per month

120

Data:F8fee5d3-3ff9-4cb3-8745-ce6b96824719 | Open Energy Information  

Open Energy Info (EERE)

fee5d3-3ff9-4cb3-8745-ce6b96824719 fee5d3-3ff9-4cb3-8745-ce6b96824719 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2004/02/21 End date if known: Rate name: Single Phase Master Metered (Non Demand) RV Parks (400-499 local access) Sector: Residential Description: Service under this schedule is available to master-metered mobile home parks and recreational vehicle (RV) parks. The type of service provided under this schedule is single phase, at the standard voltage available for the premises to be served, supplied through one meter at one point of delivery.

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

A pipeline scheduling model  

E-Print Network (OSTI)

A PIPELINE SCHEDULING MODEL A Thesis by THOMAS MELVIN BEATTY Submitted to the Graduate College of Texas AAM University in partial fulfillment of the requirement for the degree of MASTER QF SCIENCE August 1975 Major Subject: Computing... Science R PIPELINE SCHEDULING MODEL A Thesis by THOMAS MELVIN BEATTY Approved as to style and content by: Chairman of ommittee Member (Head o f Department ) Member August 1975 ABSTRACT A PIPELINE SCHEDULING MODEL (August 1975) Thomas Melvin...

Beatty, Thomas Melvin

2012-06-07T23:59:59.000Z

122

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS...  

Office of Environmental Management (EM)

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS This schedule covers accountable...

123

City of Asheville - Building Permit Fee Waiver | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 7/01/2009 State North Carolina Program Type Green Building Incentive Provider Building Safety Department The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings. Waivers for building permit fees may apply to residences with the following designations (the regular fee is in parentheses): * HealthyBuilt Home Certification* ($100) * Energy Star Rating ($100) * Geothermal heat pumps ($50)

124

Privacy Act Fees and Time Limits | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Fees and Time Limits | National Nuclear Security Administration Fees and Time Limits | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Privacy Act Fees and Time Limits Home > About Us > Our Operations > NNSA Office of General Counsel > Privacy Act (PA) of 1974 > Privacy Act Fees and Time Limits Privacy Act Fees and Time Limits The Act provides agencies to assess fees only for the cost of reproducing

125

Federal Court Dismisses Waste Fee Challenges | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Court Dismisses Waste Fee Challenges Federal Court Dismisses Waste Fee Challenges Federal Court Dismisses Waste Fee Challenges December 13, 2010 - 2:31pm Addthis The D.C. Circuit today dismissed petitions filed by the National Association of Regulatory Utility Commissioners (NARUC) and other entities seeking (1) to force the Department to issue an assessment of the adequacy of the nuclear waste fund fee and (2) compelling suspension of the fee. These petitions were filed before the Department's recent issuance of a new fee assessment, and, in that context, the court determined that the petitions were moot and unripe. The court's order can be found here. Addthis Related Articles NARUC Releases Cybersecurity Primer for Utility Regulators (June 2012) DOE Does Not Oppose Petitions to Intervene in Yucca Mountain NRC Proceeding

126

SCE&G-3-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-E Wholesale Power Rate Schedule 3-E Wholesale Power Rate Schedule SCE&G-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be scheduled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

127

ETH-Bibliothek Fees ETH staff and doc-toral students with  

E-Print Network (OSTI)

additional: 5.­ 1-2 images: 20.­ each additional: 10.­ Publication and royalty fees Copies (PDF) per page fees and royalty fees free of charge free of charge free of charge ex publication: 20

Gilli, Adrian

128

Rules and Regulations Governing the Establishment of Various Fees (Rhode  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Establishment of Various Fees the Establishment of Various Fees (Rhode Island) Rules and Regulations Governing the Establishment of Various Fees (Rhode Island) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Rhode Island Program Type Siting and Permitting Provider Department of Environmental Management These regulations describe the fees associated with several Department of Environmental Management regulatory programs, including programs pertaining

129

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Analytical Services & Testing Contract June 2014 Contractor: Contract Number: Contract Type: Advanced Technologies & Labs International Inc. DE-AC27-10RV15051 Cost Plus Award Fee...

130

FY 13 Award Fee Determination Scorecard Contractor: Swift &...  

NLE Websites -- All DOE Office Websites (Extended Search)

There were no significant deficiencies but improvements are expected in work controls and conduct of operations in fiscal year 2014. Performance Based Incentives Award Fee...

131

Microsoft Word - Award Fee Determination Scorecard for FY 2013...  

NLE Websites -- All DOE Office Websites (Extended Search)

(81.1%) Award Fee Area Adjectival Ratings: Functional Element Adjectival Rating* Conduct of Operations Very Good General Management Very Good -Contract Administration and...

132

Fees For Disposal Of Hazardous Waste Or Substances (Alabama)  

Energy.gov (U.S. Department of Energy (DOE))

The article lists annual payments to be made to counties, restrictions on disposal of hazardous waste, additional fees collected by counties and penalties.

133

Sacramento Ordinance to Waive Fees for Solar Hot Water  

Energy.gov (U.S. Department of Energy (DOE))

An ordinance suspending for the calendar years 2007-2009 all fees related to installations of solar water heaters on existing residences.

134

Alaska Division of Water Permit Fees | Open Energy Information  

Open Energy Info (EERE)

Web Site: Alaska Division of Water Permit Fees Author Alaska Division of Water Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for DOI availability:...

135

Sandia National Laboratories: User Fees for NSTTF Capabilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Capabilities * NSTTF User Fees * Optics Lab * rotating platform * solar * Solar Energy * Solar Furnace * solar power * Solar Research * Solar Tower Comments are closed. Last...

136

ADMINISTRATIVE RECORDS SCHEDULE 23:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES June 2007 Revision 1 This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and control records, calendars, and indexes; and documents of transitory value. This schedule does not apply to any materials determined to be non-record or to materials such as calendars or work schedules claimed as personal. Office Administrative Files described under item 1 are records retained by an originating office as its record of initiation of an action, request, or response to requests for information. This item may be applied only to separate administrative files containing such records as copies of

137

West Penn Power Co | Open Energy Information  

Open Energy Info (EERE)

West Penn Power Co West Penn Power Co Place Pennsylvania Utility Id 20387 Utility Location Yes Ownership I NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Transmission Yes Activity Distribution Yes Activity Wholesale Marketing Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 10 (Residential Service) Residential 20 (General Service) Commercial 30 (General Power Service >500kW) Commercial 30 (General Power Service 100kW-500kW) Commercial Average Rates Residential: $0.0291/kWh Commercial: $0.0110/kWh Industrial: $0.0058/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

138

City of Key West, Florida (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

Florida (Utility Company) Florida (Utility Company) Jump to: navigation, search Name Key West City of Place Florida Utility Id 10226 Utility Location Yes Ownership M NERC Location FRCC NERC FRCC Yes Operates Generating Plant Yes Activity Generation Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Distribution Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Governmental Recreational Facility Lighting (Schedule S-3) LED High Watt, Approx. 72 Watt (Street Light Schedule S-1) Lighting LED High Watt, Approx. 72 Watts (Area Lighting Schedule S-2) Lighting

139

Definition: Dynamic Interchange Schedule Or Dynamic Schedule | Open Energy  

Open Energy Info (EERE)

Schedule Or Dynamic Schedule Schedule Or Dynamic Schedule Jump to: navigation, search Dictionary.png Dynamic Interchange Schedule Or Dynamic Schedule A telemetered reading or value that is updated in real time and used as a schedule in the AGC/ACE equation and the integrated value of which is treated as a schedule for interchange accounting purposes. Commonly used for scheduling jointly owned generation to or from another Balancing Authority Area.[1] Related Terms balancing authority, balancing authority area, smart grid References ↑ Glossary of Terms Used in Reliability Standards An in LikeLike UnlikeLike You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Dynamic_Interchange_Schedule_Or_Dynamic_Schedule&oldid=502492

140

City of West Point, Georgia (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

West Point, Georgia (Utility Company) West Point, Georgia (Utility Company) Jump to: navigation, search Name City of West Point Place Georgia Utility Id 20393 Utility Location Yes Ownership M NERC Location SERC Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large Commercial Commercial Medium Commercial Commercial Residential Residential Small Commercial Commercial Average Rates Residential: $0.0923/kWh Commercial: $0.1080/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=City_of_West_Point,_Georgia_(Utility_Company)&oldid=410414"

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

2014 CAMD Users Meeting Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedule Friday, April 25th, 2014 LTRC Transportation Training and Education Center (TTEC), 4099 Gourrier Avenue Printable Schedule here 8:00 - 8:30 - REGISTRATION Morning Session...

142

Reclaimer Scheduling: Complexity and Algorithms  

E-Print Network (OSTI)

Feb 17, 2014 ... Abstract: We study a number of variants of an abstract scheduling problem inspired by the scheduling of reclaimers in the stockyard of a coal...

Enrico Angelelli

2014-02-17T23:59:59.000Z

143

West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE))

The West Valley Demonstration Project came into being through the West Valley Demonstration Project Act of 1980. The Act requires that the DOE is responsible for solidifying the high-level waste, disposing of waste created by the solidification, and decommissioning the facilities used in the process.

144

Highlights: East & West Jerusalem  

E-Print Network (OSTI)

Zefat, Sea of Galilee 18 May Golan Heights, Hula Valley, Jordan River 19 May East Jerusalem 20 May WestHighlights: Tel Aviv East & West Jerusalem Zefat Sea of Galilee Jaffa Dead Sea Masada Jordan River & Valley Golan Heights Qumran (day-by-day itinerary and more details on reverse side) Priority application

145

ADMINISTRATIVE RECORDS SCHEDULE 22:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 22: ADMINISTRATIVE RECORDS SCHEDULE 22: AUDIT/INVESTIGATIVE RECORDS June 2007 Revision 1 Section I of this schedule covers records associated with investigations other than those performed by the Office of the Inspector General (OIG). Types of investigations may include: routine and significant internal program investigations, specific purpose investigations, audits, inspections, appraisals, and management reviews. Investigations may be described or referred to as audits, appraisals, surveillance, self-assessments, management assessments, or evaluations. Investigations may be conducted by DOE or by its contractors. Section II covers records created by the Department's OIG investigations. OIG investigations serve to prevent or reduce waste and fraud in Departmental programs,

146

ADMINISTRATIVE RECORDS SCHEDULE 16:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 ADMINISTRATIVE RECORDS SCHEDULE 16: ADMINISTRATIVE MANAGEMENT RECORDS June 2007 Revision 1 This schedule covers those administrative management activities not covered by other Administrative Schedules. Included are disposable records created in the course of organizational planning, development, and simplification of procedures; records management activities; and administration of management improvement programs. See ADM 1 (items 12 and 13) for the disposition of case files on individuals involved in incentive award and similar types of management improvement programs. The organizational locations and titles of administrative management units vary. They may be scattered at numerous levels or locations, or may be centralized. For the purposes

147

ADMINISTRATIVE RECORDS SCHEDULE 11:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 11: ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS June 2007 Revision 1 This schedule provides for the disposal of all copies, wherever located in the Department, of records relating to space and maintenance, except as indicated below. Records documenting these functions pertain to the acquisition, allocation, utilization, and release of space and include related correspondence and reports submitted to the General Services Administration (or equivalent agency with similar Government-wide responsibilities) as directed by law and regulation (41 CFR 101-17); correspondence and forms relating to the compilation of directory service listings; identification credentials and related accountable records; requests for building and equipment services;

148

Administrative Records Schedule: Communication Records | Department...  

Office of Environmental Management (EM)

Administrative Records Schedule: Communication Records Administrative Records Schedule: Communication Records The principal records documenting communication function...

149

Implementing Lottery Scheduling: Matching the Specializations Traditional Schedulers  

E-Print Network (OSTI)

in traditional non­ real time process schedulers. Lottery scheduling enables flexible control over relative. We achieve this while maintaining lottery scheduling's flexible control over relative execution rates a recently troduced proportional­share scheduler that enables flexible control over relative rates which CPU

150

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

DE-AM09-05SR22405DE-AT30-07CC60011SL14 Contractor: Contract Number: Contract Type: Cost Plus Award Fee 357,223 597,797 894,699 EM Contractor Fee Site: Stanford Linear...

151

Colorado School of Mines 1 Tuition, Fees, Financial  

E-Print Network (OSTI)

Colorado School of Mines 1 Tuition, Fees, Financial Assistance, Housing & Dining Rates 2014-2015 Tuition and fees are established by the Board of Trustees of Colorado School of Mines following the annual budget process and action by the Colorado General Assembly and Governor. Undergraduate Tuition

152

Student Action Committee Report on the Student Comprehensive Fee  

E-Print Network (OSTI)

1 Student Action Committee Report on the Student Comprehensive Fee April, 2010 #12;2 Table:................................................................................................................15 #12;3 Executive Summary: The SGA formally adopted a definition of the Student Comprehensive Fee requiring that all sections support specific services and facilities accessible to all current students

Hayden, Nancy J.

153

Westly Group | Open Energy Information  

Open Energy Info (EERE)

navigation, search Name: Westly Group Place: Menlo Park, California Zip: 94025 Product: Clean technology-oriented venture capital firm. References: Westly Group1 This article...

154

Air Pollution Control Fees (Ohio) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Pollution Control Fees (Ohio) Air Pollution Control Fees (Ohio) Air Pollution Control Fees (Ohio) < Back Eligibility Utility Agricultural Investor-Owned Utility State/Provincial Govt Construction Municipal/Public Utility Local Government Rural Electric Cooperative Program Info State Ohio Program Type Environmental Regulations Fees Provider Ohio Environmental Protection Agency Facilities with a potential to emit any one regulated air pollutant of a quantity greater than or equal to 100 tons per year, or any one hazardous air pollutant (HAP) greater than or equal to 10 tons per year, or any combination of hazardous air pollutants greater than 25 tons per year, must submit, in a form and manner prescribed by the director, a fee emission report that quantifies the actual emission data for particulate matter,

155

PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP)  

NLE Websites -- All DOE Office Websites (Extended Search)

- March 2013 Page 1 - March 2013 Page 1 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP) 1 OCTOBER 2012 through 30 SEPTEMBER 2013 Contract No. DE- EM-0001971 I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) provides a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract. Fee determinations are not subject to the Disputes Clause of the contract. II. ORGANIZATIONAL STRUCTURE AND DUTIES The following organizational structure is established for administering the fee provisions of the contract. A. Roles and Responsibilities 1. Fee Determination Official (FDO) - The Head of Contracting Activity (HCA) has appointed the CBFO Manager as the FDO. The FDO

156

Symmetry in Scheduling Problems  

E-Print Network (OSTI)

Nov 16, 2010 ... one is determining production schedules for identical machines. ...... j(t)) gives the cost of generator j producing pj(t) units of electricity at time t.

2010-11-16T23:59:59.000Z

157

ADMINISTRATIVE RECORDS SCHEDULE 21:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS June 2007 Revision 1 This schedule covers audiovisual and related records created by or for Department and those acquired in the normal course of business. For audiovisual records that are not described in this schedule, an SF 115, Request for Records Disposition Authority, must be submitted to the National Archives and Records Administration (NARA). Audiovisual records include still and motion picture photography, graphic materials, and sound and video recordings. Related documentation includes (1) production files or other files documenting the creation, justification, ownership, and rights to the records and (2) finding aids used to identify or access the records. This schedule does not cover: (1) cartographic records, (2) remote sensing imagery

158

SCE&G-2-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-E Wholesale Power Rate Schedule 2-E Wholesale Power Rate Schedule SCE&G-2-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be wheeled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does

159

SCE&G-1-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-E Wholesale Power Rate Schedule 1-E Wholesale Power Rate Schedule SCE&G-1-E Wholesale Power Rate Schedule Area: South Carolina Electric & Gas Area System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina to whom power may be wheeled and scheduled pursuant to contracts between the Government and the South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate

160

SCE&G-4-E Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-E Wholesale Power Rate Schedule 4-E Wholesale Power Rate Schedule SCE&G-4-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina This rate schedule shall be available public bodies and cooperatives (any one of which is hereinafter called the Customer) in South Carolina served through the transmission facilities of South Carolina Electric & Gas Company (hereinafter called the Company). This rate schedule shall be applicable to the sale at wholesale of power and accompanying energy generated at the Allatoona, Buford, J. Strom Thurmond, Walter F. George, Hartwell, Millers Ferry, West Point, Robert F. Henry, Carters and Richard B. Russell Projects and sold under appropriate contracts between the Government and the Customer. This rate schedule does not apply to energy from pumping operations at the Carters and Richard B.

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Data:B52fc314-6fee-4909-a9f8-d21e624a99cc | Open Energy Information  

Open Energy Info (EERE)

fc314-6fee-4909-a9f8-d21e624a99cc fc314-6fee-4909-a9f8-d21e624a99cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2013/07/04 End date if known: 2018/06/30 Rate name: Schedule EV-U - Commercial Public Electric Vehicle Charging Service Pilot Sector: Commercial Description: APPLICABILITY: This Schedule is applicable only for DC fast charging service provided to on-road electric vehicles at Company-operated public electric vehicle charging facilities. A maximum total of twenty-five (25) DC fast charging customer accounts (i.e., 25 utility meters) across the combined service territories of Hawaiian Electric Company, Inc., Maui Electric Company, Limited, and Hawaii Electric Light Company, Inc., will be permitted under this Schedule. The Companies may submit a request to increase the permitted maximum for the review and approval of the Hawaii Public Utilities Commission. Service under this Schedule will be available through June 30, 2018.

162

DOE Records Disposition Schedule Changes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Records Disposition Schedule Changes DOE Records Disposition Schedule Changes Disposition Schedule Changes DOE Records Disposition Schedule Changes More Documents & Publications...

163

West | OpenEI  

Open Energy Info (EERE)

West West Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 108, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Reliability First Corporation Renewable Energy Generation West Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - Reliability First Corporation / West- Reference Case (xls, 119 KiB) Quality Metrics Level of Review Peer Reviewed Comment

164

West Nile Virus  

NLE Websites -- All DOE Office Websites (Extended Search)

NILE VIRUS (WNS) NILE VIRUS (WNS) DEFINITION West Nile virus is an infection transmitted by mosquitoes. If you become infected with West Nile virus, you may not experience any signs or symptoms or you may experience only minor ones, such as fever and mild headache. However, some people who become infected with West Nile virus develop a life-threatening illness that includes inflammation of the brain. MODES OF TRANSMISSION The main route of human infection with West Nile virus is through the bite of an infected mosquito. Mosquitoes become infected when they feed on infected birds, which may circulate the virus in their blood for a few days. The virus eventually gets into the mosquito's salivary

165

Steven Westly | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Westly Westly About Us Steven Westly - Managing Partner, Westly Group Photo of Steven Westly Steve Westly has built one of the larger clean tech venture capital firms in the U.S. Prior to founding The Westly Group, Steve Westly served as the Controller and Chief Fiscal Officer of the state of California - the world's sixth largest economy. As Controller, he chaired the State Lands Commission and served on 63 other boards and commissions, including CalPERS and CalSTRS, the nation's two largest public pension funds, which together invest more than $350 billion. Mr. Westly led an effort to commit more than $1 billion to clean technology investments. Before running for office, Mr. Westly helped guide the online auction company eBay through its period of most rapid growth, serving as the Senior

166

Local Option - Building Permit Fee Waivers for Renewable Energy Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Local Option - Building Permit Fee Waivers for Renewable Energy Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government General Public/Consumer Industrial Installer/Contractor Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Connecticut Program Type Solar/Wind Permitting Standards Provider Department of Energy and Environmental Protection As of July 2011, Connecticut authorizes municipalities to pass a local

167

JGI - CSP Proposal Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Schedule Proposal Schedule CSP | Overview | How to Propose a Project | Review Process | DOE Relevance Proposal Schedule | FAQ Small-scale Microbial/Metagenome Proposals - reviewed twice yearly Small-scale proposals for specific types of microbial and metagenome projects are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for submission is 60 days prior to the review date. Next review dates (submission deadline in parentheses): January 2014 (Nov 22, 2013) July 2014 (May 23, 2014) Submit small-scale microbial/metagenome proposals anytime using the Work Initiation Process (WIP) interface. Synthetic Biology proposals Synthetic biology proposals are accepted on a continuous basis and will be reviewed twice a year. Letters of intent are not required. Deadline for

168

SRS CAB - Meeting Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

SRS CAB Meeting Schedule SRS CAB Meeting Schedule Savannah River Site - Citizens Advisory Board 2013 Schedule To join current Online Meetings or view archived Online Meetings click on the buttons in the right-hand column. CAB Full Board and Combined Committees Meetings are not presented in the Online Meeting format. Instructions for Accessing Committee Meetings Online To request a copy of an archived online meeting, scroll down to the date of the meeting you wish to request, and click on the green "Request Archived Online Meeting" button. Your email browser will open and generate a new email to srscitizensadvisoryboard@srs.gov with the committee meeting you wish to request in the subject line. Please, include your name and mailing address in the body of the email. Once we receive the email, we will send

169

NERSC Holiday Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC NERSC Holiday Schedule NERSC Holiday Schedule December 20, 2013 by Francesca Verdier (0 Comments) All NERSC computing and storage systems will remain in full operation throughout the holiday season (Tuesday December 24 through Wednesday January 1). From Tuesday December 24 through Wednesday January 1, NERSC Consulting and Account Support services will be available *only* on Friday December 27 and Monday December 30, from 8:00 to 5:00 Pacific Time. Normal Consulting and Account Support schedules will resume on Thursday, January 2. As always, critical system problems may be reported at any time to NERSC Operations at 1-800-666-3772, menu option 1, or 1-510-486-6821. You should also contact Operations if you need to have your password reset (or login failures cleared) over the holidays.

170

Cost-share Fee Waiver request form Request for a cost share for a GSSP fee waiver on the following project. Documentation from granting  

E-Print Network (OSTI)

Cost-share Fee Waiver request form Request for a cost share for a GSSP fee waiver on the following project. Documentation from granting agency with information regarding tuition as unallowable must____________________________________________________________ Project Name __________________________________________________________________ Funding Agency

Taylor, Jerry

171

ADMINISTRATIVE RECORDS SCHEDULE 20:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20: 20: ELECTRONIC RECORDS April 2008 Revision 2 This schedule authorizes the disposition of specified electronic records and hard-copy or microform records and are integrally related to them. The electronic records may either be created or received. Included are records created by computer operators, programmers, analysts, systems administrators, and all personnel with access to a computer. Disposition authority is provided for certain master files, including some tables that are components of data base management systems, and certain files created from master files for specific purposes. In addition, this schedule covers certain disposable electronic records produced by end users in office automation applications. These disposition authorities apply to the

172

GENERAL RECORDS SCHEDULE 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39 39 DEPARTMENT OF ENERGY ADMIN1STRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS June 2007 Revision 2 As do all Administrative Records Schedules (ADMs), ADM-1 covers records of the Department and its contractors. The records include, employee concerns programs, labor agreements and negotiations, labor relations, academic and outreach programs, apprenticeship programs, job vacancies, unemployment compensation, recruitment and employee health. The most important types of records are the Official Personnel Folders, the Service Record Cards, and the Employee Medical Folders. Those for Federal employees are maintained according to The Guide to Personnel Recordkeeping, an Office of Personnel Management directive that prescribes a system of recordkeeping for Federal

173

SORT BY TEST Animal Health Diagnostic Center Test and Fee Schedule  

E-Print Network (OSTI)

container; 2) slide mailer 1) Refrigerate. Ship in insulated container with ice pack. 2) Not required *May-3) Refrigerate. Ship in insulated container with ice pack. 4) Not required *May qualify for New York State container 1-3) Refrigerate. Ship in insulated container with ice pack For more information, see Appendix

Keinan, Alon

174

EGov PMA Scorecard Cost, Schedule & Performance Standard...  

Energy Savers (EERE)

EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule &...

175

Data:7322b2fe-026b-400a-895f-ee3d34e4f43d | Open Energy Information  

Open Energy Info (EERE)

fe-026b-400a-895f-ee3d34e4f43d fe-026b-400a-895f-ee3d34e4f43d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Concord, North Carolina (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: General Service- Time of Use Sector: Commercial Description: Available only to non-residential loads with a demand greater than or equal to 100 kW during at least three months of a twelve-month period and an average annual load factor of at least 55%. Service under this Schedule should be used for a Customer with a single enterprise located entirely on a single, contiguous premise.

176

Data:68ab6a98-327f-4864-9d4c-51fc603fee13 | Open Energy Information  

Open Energy Info (EERE)

a98-327f-4864-9d4c-51fc603fee13 a98-327f-4864-9d4c-51fc603fee13 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Power Admin Effective date: End date if known: Rate name: Wholesale Power Rate Schedule CP&L-2-B Sector: Commercial Description: Source or reference: http://199.44.84.82/files/CP&L-2-B.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

177

Data:90368ef0-e63f-4683-9c8f-ee6e563cef0b | Open Energy Information  

Open Energy Info (EERE)

368ef0-e63f-4683-9c8f-ee6e563cef0b 368ef0-e63f-4683-9c8f-ee6e563cef0b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Black River Falls, Wisconsin (Utility Company) Effective date: 2010/04/15 End date if known: Rate name: Street Lighting - Ms-1 - Contributed Lights 150 W HPS (100% contributed) Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will install and maintain street lighting units. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=550 Source Parent: Comments Applicability

178

City of New Martinsville, West Virginia (Utility Company) | Open Energy  

Open Energy Info (EERE)

West Virginia (Utility Company) West Virginia (Utility Company) Jump to: navigation, search Name New Martinsville City of Place West Virginia Utility Id 13471 Utility Location Yes Ownership M NERC Location RFC NERC RFC Yes RTO PJM Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Large Power Commercial Large Power(Primary Metering) Commercial Residential Residential Security Light- 150W High Pressure Sodium Lighting Security Light- 175W Mercury Vapor Lighting Security Light- 250W High Pressure Sodium Lighting Security Light- 400W High Pressure Sodium Lighting Security Light- 400W Mercury Vapor Lighting

179

City of Riverhead - Energy Conservation Device Permitting Fees | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 07/01/2005 (retroactive) State New York Program Type Green Building Incentive Provider Building Department In 2006 the Town of Riverhead on Long Island enacted a special allowance in its building permit fee structure to provide a discount to people wishing to install energy conservation devices on residential or commercial buildings. The provision in the town code applies to any energy conservation device "installed in or on a structure which qualifies for any federal, state or local tax exemption, tax credit or tax rebate", but

180

Property Tax Fee-In-Lieu (Mississippi) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Property Tax Fee-In-Lieu (Mississippi) Property Tax Fee-In-Lieu (Mississippi) Property Tax Fee-In-Lieu (Mississippi) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Mississippi Program Type Property Tax Incentive Provider Mississippi Department of Revenue The Property Tax Fee-In-Lieu allows for new or expansion projects in the

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Small Business Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration (SBA) Guarantee Fee Tax Credit Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) Small Business Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) < Back Eligibility Agricultural Commercial Construction Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Oklahoma Program Type Corporate Tax Incentive Provider Small Business Administration The Small Business Administration (SBA) Guarantee Fee Tax Credit allows for small businesses operating in Oklahoma to claim a credit against income tax liability. This credit may be claimed for tax year 2012 and subsequent tax

182

D235 (8-11) Patient Copy Fee Agreement  

E-Print Network (OSTI)

): _______________________________________________ For credit card billing: r VISA r M/C Credit card #: Expiration Date: Name on credit card: Credit card billing address: (Please note: sales tax and applicable postage will be added to total fee.) #12;

Squire, Larry R.

183

Idaho Water Right Applications, Forms, and Fees Webpage | Open...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho Water Right Applications, Forms, and Fees Webpage Abstract This webpage provides an overview...

184

Project Scheduling (3) Corequisite  

E-Print Network (OSTI)

) CMGT 111 Construction Materials & Methods Lab (1) CMGT 460 Project Cost Controls (3) FA SP CMGT 320 FASYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro) CMGT 475 Construction Project Management (3) MATH 108 College Algebra (4) Construction Elective

Barrash, Warren

185

Project Scheduling (3) Corequisite  

E-Print Network (OSTI)

460 Project Cost Controls (3) FA SP FA CE 210/211 Surveying & Lab (3) CMGT 410 Concrete FormworkSYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro Construction Project Management (3) MATH 108 College Algebra (4) MGMT 301 Leadership Skills (3) ENGL 101

Barrash, Warren

186

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

and Fee to someone by E-mail and Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) Tax and Fee Compressed natural gas (CNG) used in motor vehicles is subject to a state

187

Enforcement Documents - West Valley Demonstration Project | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project Enforcement Documents - West Valley Demonstration Project December 7, 1999 Preliminary Notice of Violation, West Valley Nuclear Services -...

188

Oversight Reports - West Valley Demonstration Project | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project Oversight Reports - West Valley Demonstration Project August 24, 2012 Independent Activity Report, West Valley Demonstration Project - July 2012...

189

Circleville, West Virginia 26804  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

P.O. Box 194 P.O. Box 194 Circleville, West Virginia 26804 March 28, 2012 Lamont Jackson Office of Electricity Delivery and Energy Reliability U.S. Department of Energy 1000 Independence Ave. SW Washington, DC 20585 Via email to lamont.jackson@hq.doe.gov Re: OE Docket No. RRTT-IR-001 (Rapid Response Team for Transmission); Office of Electricity Delivery and Energy Reliability, Department of Energy Dear Mr. Jackson: Please accept the following comments submitted on behalf of the Allegheny Highlands Alliance, Inc. ("AHA"), an organization comprised of residents of the states of West Virginia, Pennsylvania, Maryland, Virginia and North Carolina. AHA is presently awaiting a decision

190

TOWARDS UNIFYING DATABASE SCHEDULING AND  

E-Print Network (OSTI)

1 TOWARDS UNIFYING DATABASE SCHEDULING AND CONCURRENCY CONTROL: A FRONTIER APPROACH Gregory Jones previous work in real-time database concurrency control indexconcur- rency control and scheduling has focused on combiningvariations of traditional concurrency control techniques with real-time scheduling

Rhode Island, University of

191

Final_Tech_Session_Schedule_and_Location.xls  

NLE Websites -- All DOE Office Websites (Extended Search)

Terrestrial Ecosystems in the MRCSP Region Presentation to: Fourth Annual Conference for Carbon Sequestration Alexandria Virginia May 2-5, 2005 MRSCP Land-Uses Analyzed and Team * Non-eroded Cropland - The Ohio State University: Rattan Lal * Eroded Cropland - Purdue University: William McFee and Larry Biehl * Marginal Land - Pennsylvania State University: Sjoerd Duiker * Mineland - West Virginia University: Mark Sperow * Wetland and Marshland - University of Maryland: Brian Needelman * Modeling all Land Classifications - Michigan State University: Peter Grace MRCSP Land-use, Area, and Potential C Storage Land-Use Area (Mha) C Storage (MMTC yr -1 ) Non-Eroded Cropland 10.7 3.7 Eroded Cropland 1.6 3.1 Marginal Land 6.5 26.9 Mineland 0.6 1.5 Wetland/Peatland 3.4 3.9 Total 22.8 39.1 MRCSP CO 2

192

Data:C5cc335b-19b8-46fe-b828-d09fee0617ec | Open Energy Information  

Open Energy Info (EERE)

35b-19b8-46fe-b828-d09fee0617ec 35b-19b8-46fe-b828-d09fee0617ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: OUTDOOR LIGHTING MV-11* 250 W Sector: Lighting Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. APPLICATION OF SCHEDULE: This schedule is applicable to any Customer for automatically operated dusk to dawn outdoor lighting supplied and operated by the Company.*Due to the U.S. Government Energy Act of 2005, after August 1, 2008, the Company will no longer install Mercury Vapor fixtures for new installations.

193

Optimal Power Schedule for Distributed MIMO Links  

E-Print Network (OSTI)

an integration of link scheduling and power control for MIMOmedium access control, space-time power scheduling. Fig. 1.

Rong, Yue; Hua, Yingbo

2008-01-01T23:59:59.000Z

194

ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: INFORMATIONAL SERVICES RECORDS ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS This schedule covers certain records pertaining to informational services...

195

(TWST = Tri-Cities West Building) West Building  

E-Print Network (OSTI)

Elevator (TWST = Tri-Cities West Building) West Building 1st Floor Stage to parking lot Nursing TV Parking Lot and Cougar Garden Admissions Elevator Elevator Commons To the East Building Mac Lab Vet Center Professional Programs Student Affairs Nursing Lab Media Services Lobby West Building 2nd Floor (TWST = Tri

Collins, Gary S.

196

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Shutdown Planning Shutdown Planning Planning Templates Shutdown Planning Schedules: Current Shutdown Schedule Archives: 2006 - 2013 APS Long-Range Operations Schedule: 2014 Archives: 2013 | 2012 2011 | 2010 | 2009 | 2008 2007 | 2006 | 2005 | 2004 2003 | 2002 | 2001 | 2000 1999 | 1998 | 1997 | 1996 APS Long-Range Operations Schedule (Fiscal Year 2014) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2013-3 2014-1 2014-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2

197

The West Australian Flora  

Science Journals Connector (OSTI)

... Plain, means that Western Australia is isolated on the east by thousands of miles of desert as effectively as it is on the west by thousands of miles of ocean. ... and families. I was much impressed by this feature in a heath-like area of scrub towards the edge of the Nullabor Plain, where the average rainfall was between 10 ...

EDWARD SALISBURY

1951-07-14T23:59:59.000Z

198

ADMINISTRATIVE RECORDS SCHEDULE 14:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS June 2007 Revision 1 This schedule covers certain records pertaining to informational services performed by the Department in their day-to-day affairs and in their relations with the public, including records created in administering Freedom of Information Act (FOIA) and Privacy Act ) programs. Except as otherwise specified in individual items, it applies to copies of these records wherever located. Item 4 applies only to files maintained in office responsible for the operation of the information activities. Items 11 through 15 describe the files accumulated in carrying out the provisions of the FOIA, and items 21 through 26 describe the files created in administering the provisions of the Privacy Act. Items 31

199

Transportation Baseline Schedule  

SciTech Connect

The 1999 National Transportation Program - Transportation Baseline Report presents data that form a baseline to enable analysis and planning for future Department of Energy (DOE) Environmental Management (EM) waste/material transportation. The companion 1999 Transportation Barriers Analysis analyzes the data and identifies existing and potential problems that may prevent or delay transportation activities based on the data presented. The 1999 Transportation Baseline Schedule (this report) uses the same data to provide an overview of the transportation activities of DOE EM waste/materials. This report can be used to identify areas where stakeholder interface is needed, and to communicate to stakeholders the quantity/schedule of shipments going through their area. Potential bottlenecks in the transportation system can be identified; the number of packages needed, and the capacity needed at receiving facilities can be planned. This report offers a visualization of baseline DOE EM transportation activities for the 11 major sites and the Geologic Repository Disposal site (GRD).

Fawcett, Ricky Lee; John, Mark Earl

2000-01-01T23:59:59.000Z

200

BNL | ATF Beam Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Beam Schedule (pdf) Beam Schedule (pdf) Sunday Monday Tuesday Wednesday Thursday Friday Saturday 22 1/2 Holiday Holiday 28 January Holiday 4 5 Maintenance 11 12 Maintenance 18 19 Holiday AE52 - DWFA (Euclid), BL2 25 February AE52 - DWFA (Euclid), BL2 1 2 AE50 - PWFA in QNR (UCLA), BL2 8 9 AE50 - PWFA in QNR (UCLA), BL2 15 16 Holiday AE50 - PWFA in QNR (UCLA), BL2 22 March 1 2 AE53 - Nonlinear Compton (UCLA) 8 9 AE53 - Nonlinear Compton (UCLA) 15 16 AE53 - Nonlinear Compton (UCLA) 22 23 29 Sunday Monday Tuesday Wednesday Thursday Friday Saturday User operations (E-beam in use) Ions - Ion generation User operations (laser in use) PWFA - Plasma Wakefield Acceleration User operations (E-beam and laser in use)

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

West Point Utility System | Open Energy Information  

Open Energy Info (EERE)

System System Jump to: navigation, search Name West Point Utility System Place Iowa Utility Id 20396 Utility Location Yes Ownership M NERC Location MRO NERC MRO Yes Activity Bundled Services Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Service and Municipal Institutional service Large General Service Commercial Rural Resident and Farm All-Electric Residential Rural Resident and Farm Rate Residential Security Light - 150 Watt HPS Customer Owned Pole Lighting Security Light - 150 Watt HPS Utility Owned Pole Lighting Urban All-Electric Residential Rate Residential

202

High West Energy, Inc | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Name High West Energy, Inc Place Colorado Utility Id 27058 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png A F Industrial Commercial & Small Power Commercial Farm and Home Residential Irrigation Industrial Large Power Industrial Large Power T-O-D Industrial Large Power T-O-D V2 Industrial Large Power V2 Industrial Security Lighting-150 - 175 watt M V/ HPS Lighting Security Lighting-200 - 250 watt M V/ HPS Lighting Security Lighting-400 watt M V/ HPS Lighting Street Lighting-200 - 250 watt M V/ HPS Lighting Street Lighting-400 watt M V/ HPS Lighting Time-of-Use Commercial

203

1993 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect

Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

US Bonneville Power Administration

1993-10-01T23:59:59.000Z

204

Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of the adequacy of the fee being paid by nuclear power utilities...

205

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States » West Virginia United States » West Virginia West Virginia October 22, 2013 Data Safer than Ever with FM-200 Installation The consolidated data center at the Legacy Management Business Center (LMBC) in Morgantown, West Virginia, is now guarded by a state-of-the-art FM-200® Fire Suppression System. Installation of the new system began on June 11, 2013, and the system became operational on July 18. October 16, 2013 West Virginia Venture Capital (West Virginia) The West Virginia Venture Capital provides investment funds to eligible businesses stimulating economic growth and providing or retaining jobs within the state through qualified venture capital companies. Terms and conditions for funding eligibility are dependent on the varying terms of participating venture capital funds.

206

Enforcement Letter - Argonne West  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 1999 9, 1999 Mr. John I. Sackett [ ] Argonne National Laboratory-West P.O. Box 2528 Idaho Falls, Idaho 83403-6000 Subject: Enforcement Letter (NTS-CH-AA-ANLW-ANLW-1998-0001) Dear Mr. Sackett: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning two incidents occurring in June and August 1998 at Argonne National Laboratory - West's (ANLW) Fuel Conditioning Facility (FCF): dropping a fuel basket assembly containing chopped fuel elements and repair of a manipulator seal tube. During November 2-3, 1998, DOE conducted an investigation to determine what, if any, noncompliances with applicable nuclear safety regulations may have been associated with these incidents. A copy of the investigation summary report is

207

West Virginia.indd  

NLE Websites -- All DOE Office Websites (Extended Search)

West Virginia West Virginia www.effi cientwindows.org March 2013 1. Meet the Energy Code and Look for the ENERGY STAR ® Windows must comply with your local energy code. Windows that are ENERGY STAR qualifi ed typically meet or exceed energy code requirements. To verify if specific window energy properties comply with the local code requirements, go to Step 2. 2. Look for Effi cient Properties on the NFRC Label The National Fenestration Rating Council (NFRC) label is needed for verifi cation of energy code compliance (www.nfrc. org). The NFRC label displays whole- window energy properties and appears on all fenestration products which are part of the ENERGY STAR program.

208

2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.  

SciTech Connect

This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

209

West Berkeley Public Library  

Berkeley, CA The West Berkeley Public Library, first opened in December 2013, is the first publicly funded Zero Net Energy public library in California. The library takes advantage of many innovative technologies and passive design strategies to achieve its Zero Net Energy goals. The project's Building Team, led by Harley Ellis Deveraux, partnered with PG&E's Savings By Design program to perform early-stage design analyses including climate modeling, computational fluid dynamics, daylighting, solar modeling, and energy simulations.

210

West Texas Rain  

E-Print Network (OSTI)

and Water Commission, Culberson County Underground Water District and county officials to install a 2,500-gallon rainwater harvesting tank at the Culberson County Courthouse. West Texas Rain Rainwater harvesting demonstration sites save water and money... (Above Left) One of the three rainwater harvesting demonstrations is located at the Culberson County Courthouse in Van Horn. This 2,500-gallon tank has been installed to catch and store the rainwater. (Above Right) Landscape irrigation using...

Supercinski, Danielle

2006-01-01T23:59:59.000Z

211

Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rate Schedules Rate Schedules Rate Schedules One of the major responsibilities of Southeastern is to design, formulate, and justify rate schedules. Repayment studies prepared by the agency determine revenue requirements and appropriate rate levels and these studies for each of Southeastern's four power marketing systems are updated annually. They demonstrate the adequacy of the rates for each system. Rates are considered to be adequate when revenues are sufficient to repay all costs associated with power production and transmission costs, which include the amortization of the Federal investment allocated to power. Latest Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012

212

West Plains Electric Coop Inc | Open Energy Information  

Open Energy Info (EERE)

West Plains Electric Coop Inc West Plains Electric Coop Inc Place North Dakota Utility Id 20395 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates No Rates Available The following table contains monthly sales and revenue data for West Plains Electric Coop Inc (North Dakota). Month RES REV (THOUSAND $) RES SALES (MWH) RES CONS COM REV (THOUSAND $) COM SALES (MWH) COM CONS IND_REV (THOUSAND $) IND SALES (MWH) IND CONS OTH REV (THOUSAND $) OTH SALES (MWH) OTH CONS TOT REV (THOUSAND $) TOT SALES (MWH) TOT CONS 2008-02 520.255 9,974.038 4,609 115.333 1,963.162 969 888.433 14,154.159 788 1,524.021 26,091.359 6,366

213

Licensing Uncertain Patents: Per-Unit Royalty vs. Up-Front Fee  

E-Print Network (OSTI)

Licensing Uncertain Patents: Per-Unit Royalty vs. Up-Front Fee David Encaouay and Yassine Lefouiliz schemes are investigated: the per-unit royalty rate and the up-front fee. We provide conditions under-unit royalty scheme, the opportunity to do so does not exist under the up-front fee scheme. We also establish

Boyer, Edmond

214

Alternative Fuels Data Center: West Virginia Information  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

West Virginia West Virginia Information to someone by E-mail Share Alternative Fuels Data Center: West Virginia Information on Facebook Tweet about Alternative Fuels Data Center: West Virginia Information on Twitter Bookmark Alternative Fuels Data Center: West Virginia Information on Google Bookmark Alternative Fuels Data Center: West Virginia Information on Delicious Rank Alternative Fuels Data Center: West Virginia Information on Digg Find More places to share Alternative Fuels Data Center: West Virginia Information on AddThis.com... West Virginia Information This state page compiles information related to alternative fuels and advanced vehicles in West Virginia and includes new incentives and laws, alternative fueling station locations, truck stop electrification sites,

215

Chemotherapy Operations Planning and Scheduling  

E-Print Network (OSTI)

Feb 12, 2010 ... ning and scheduling methods for chemotherapy patients with the ... growth, control or prevent the spread of cancer cells, and/or relieve cancer...

2010-02-13T23:59:59.000Z

216

Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction Schedule Current Projects 27-ID and 35-ID APS Vibration Reporting Protocol Summary of Construction Equipment Tests and Activities Jan 2014 Past Projects APCF LOM438...

217

Archives and History Office: Records Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Services > Records Schedules Services > Records Schedules Records Schedules Note: Some links on this page open pdf files, which require the free Acrobat Reader. SLAC Current Organizational Unit File Plans / Records Control Schedules For assistance in applying or developing a records schedule for your unit, please contact either the SLAC Archives and History Office (x3091 -- directorate and research records) or the SLAC Records Manager (x4342 -- business and safety records). Directorate Organizational Unit Applicable File Plans(s) / Records Control Schedule(s) Director's Office SLAC DO Schedule Advisor for Science and Technology DOE Administrative Records schedules and DOE R&D Schedule Chief Research Officer DOE Administrative Records schedules and DOE R&D Schedule Communications Office DOE Administrative Records schedules (particularly ADM14 and ADM21)

218

Green Scheduling: Scheduling of Control Systems for Peak Power Reduction  

E-Print Network (OSTI)

approach to fine-grained coordination of energy demand by scheduling energy consuming control systems of the system variables only, control system execution (i.e. when energy is supplied to the system-Scheduling; Energy Systems; Peak Power Reduction; Load Balancing; I. INTRODUCTION During a major sporting event

Pappas, George J.

219

DOERS Records Schedule Cross Index to DOE Administrative Records...  

Office of Environmental Management (EM)

DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules...

220

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Groundwater Protection Rules Coal Mining Operations (West Virginia) Groundwater Protection Rules Coal Mining Operations (West Virginia) These rules establish a series of practices for the protection of groundwater which are to be followed by any person who conducts coal mining operations subject to the provisions of West Virginia Groundwater Protection Act and subject to regulation under the West Virginia Coal Mining and Reclamation Act and/or under West Virginia Water Pollution Control Act as it relates to coal mining operations. October 16, 2013 Groundwater Protection Plan (West Virginia) Groundwater Protection Plans (GPPs) are required for all facilities having the potential to impact groundwater. They are "preventive maintenance" documents that cover all processes and materials at a facility that "may

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Town of West Boylston, Massachusetts (Utility Company) | Open Energy  

Open Energy Info (EERE)

West Boylston Town of West Boylston Town of Place Massachusetts Utility Id 20326 Utility Location Yes Ownership M NERC Location NPCC NERC NPCC Yes ISO NE Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Industrial Industrial Large Commercial Commercial Large Municipal Commercial Residential Residential Residential (Off Peak Water Heater Service-separate meter) Residential Small Commercial Commercial Small Municipal Commercial Average Rates Residential: $0.1230/kWh Commercial: $0.1360/kWh Industrial: $0.1240/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

222

Appalachian Power Co (West Virginia) | Open Energy Information  

Open Energy Info (EERE)

Appalachian Power Co Appalachian Power Co Place West Virginia Utility Id 733 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png G.S. - T.O.D. Commercial L.G.S. Commercial R.S. Residential R.S. - T.O.D Residential Average Rates Residential: $0.0813/kWh Commercial: $0.0731/kWh Industrial: $0.0562/kWh The following table contains monthly sales and revenue data for Appalachian Power Co (West Virginia). Month RES REV (THOUSAND $) RES SALES (MWH) RES CONS COM REV (THOUSAND $) COM SALES (MWH) COM CONS IND_REV (THOUSAND $) IND SALES (MWH) IND CONS OTH REV (THOUSAND $) OTH SALES (MWH) OTH CONS TOT REV (THOUSAND $) TOT SALES (MWH) TOT CONS

223

City of West Memphis, Arkansas (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

West Memphis West Memphis Place Arkansas Utility Id 20382 Utility Location Yes Ownership M NERC SERC Yes Operates Generating Plant Yes Activity Generation Yes Activity Distribution Yes Activity Buying Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Service Commercial Large Power Service Commercial Public Authority Commercial Residential Residential Small Power Service Industrial Average Rates Residential: $0.0741/kWh Commercial: $0.0756/kWh Industrial: $0.0542/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from

224

The Potomac Edison Co (West Virginia) | Open Energy Information  

Open Energy Info (EERE)

Potomac Edison Co Potomac Edison Co Place West Virginia Utility Id 15263 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png E (General Service) Commercial G (General Service) Commercial PP (Large Primary) Commercial R (Residential) Residential Average Rates Residential: $0.0923/kWh Commercial: $0.0807/kWh Industrial: $0.0659/kWh The following table contains monthly sales and revenue data for The Potomac Edison Co (West Virginia). Month RES REV (THOUSAND $) RES SALES (MWH) RES CONS COM REV (THOUSAND $) COM SALES (MWH) COM CONS IND_REV (THOUSAND $) IND SALES (MWH) IND CONS OTH REV (THOUSAND $) OTH SALES (MWH) OTH CONS TOT REV (THOUSAND $) TOT SALES (MWH) TOT CONS

225

GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions February 26, 2010 - 3:17pm Addthis Consistent with the Administration's commitment to transparency, DOE General Counsel Scott Blake Harris has decided that all future determinations as to the adequacy of the Nuclear Waste Fund fee will be made available to the public on DOE's website shortly after DOE makes a determination. The report relied upon in determining fee adequacy for 2008, the most recent year for which DOE has made a determination, is available here: (2008 Fee Adequacy Letter Report). Addthis Related Articles DOE Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee Department of Energy Files Motion to Withdraw Yucca Mountain License

226

Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduced Registration Reduced Registration Fee for Fuel-Efficient Vehicles to someone by E-mail Share Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Facebook Tweet about Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Twitter Bookmark Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Google Bookmark Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Delicious Rank Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Digg Find More places to share Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on AddThis.com... More in this section... Federal State Advanced Search

227

_PART I - THE SCHEDULE  

National Nuclear Security Administration (NNSA)

15 dated 9/9/13 Contract No. DE-AC04-94AL85000 15 dated 9/9/13 Contract No. DE-AC04-94AL85000 Modification No. M202 Part I - The Schedule Sections B through H TABLE OF CONTENTS B-1 SERVICES BEING ACQUIRED ...................................................................................... 4 B-2 CONTRACT TYPE AND VALUE (Rev. M218, M222, M236, M241, M261, M266, M288, M293, M312, M319, M344, M365, M400, M404, M443, M448, M473, M484, M0512, A0514) ............................................................................................................................ 4 B-3 AVAILABILITY OF APPROPRIATED FUNDS ................................................................. 8 B-9999 AMERICAN RECOVERY AND REINVESTMENT ACT WORK VALUES (Added M331; Modified: A335, A336, A340, A341, A342, A346, A347, A348, A349, A350,

228

Structure Breakdown Workshop Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Breakdown Breakdown Workshop SLAC, Orange Room August 28 - 30 , 2000 Announcement Workshop Poster Workshop Goals: The Goal of the workshop is to review understanding of warm structure breakdown phenomena, to define common terms for comparing tests and to identify avenues for further study. For a partial bibliography, please view the following URL : http://www-project.slac.stanford.edu/lc/wkshp/RFBreakdwn/references/publist.htm Schedule and Presentations: Monday, August 28 8:30 - Operation Experience and Definition of Problem Moderator - G. Loew (initial questions) Opening remarks and introduction (C. Adolphsen) (15min) CERN Structure Operation Results (W. Wuensch) (30 min) NLCTA Structure Operation Results (C. Adolphsen) (30 min) ASTA Structure Operation Results (R. Loewen) (20 min)

229

Speaker Host Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

User Science Seminar User Science Seminar Previous Speakers User Science Seminar Host Schedule User seminar is hosted by a different XSD group leader every two weeks. If you have any suggestions for possible speakers for the following dates, please contact the appropiate group leader below. Month Host 2012 October 5 & 12, 2012 Peter Chupas October 19 & 26,2012 Jon Almer November 2 & 9,2012 Francesco Decarlo November 16, 2012 Stefan Vogt November 23, 2012 Cancelled - Thanksgiving Holiday December 7, 2012 Stefan Vogt December 14 & 21, 2012 Randy Winans December 28, 2012 Cancelled - Xmas Holiday 2013 Janurary 4-25, 2013 Cancelled - January Shutdown February 1 & 8 , 2013 Lahsen Assoufid February 15 & 22, 2013 Thomas Gog March 1 & 8, 2013 Jonathan Lang

230

Data:F289425d-2fee-45ba-be38-9d3283bc51a9 | Open Energy Information  

Open Energy Info (EERE)

F289425d-2fee-45ba-be38-9d3283bc51a9 F289425d-2fee-45ba-be38-9d3283bc51a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate GS-FL: OPTIONAL UNMETERED GENERAL SERVICE RATE FOR SMALL FIXED LOADS - under 540 hours Sector: Commercial Description: Applicable to electric service in the Company's entire territory where secondary distribution lines exist for any fixed electric load that can be served by a standard service drop from the Company's existing secondary distribution system. For customers taking service under any or all of the provisions of this tariff schedule, this same schedule shall constitute the Company's Standard Service Offer.

231

schedule_2006.xls  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Long Range Operations Schedule 6 Long Range Operations Schedule (October 2005 - September 2006) 1 1 1 1 → 1 1 1 4 → 1 1 1 1 1 1 2 2 4 → 2 1 → 2 2 2 4 2 2 2 2 2 1 → 2 3 3 4 3 1 → 3 3 3 4 3 3 3 3 3 1 → 3 4 4 4 4 1 → 4 4 4 4 4 4 4 4 4 1 → 4 5 5 4 5 1 → 5 5 5 4 5 5 5 5 5 1 → 5 6 6 4 6 1 6 6 6 4 6 6 6 6 6 1 → 6 7 7 4 7 1 → 7 7 7 4 7 7 7 7 7 1 → 7 8 8 4 8 1 → 8 8 8 4 → 8 8 8 8 8 1 8 9 9 9 1 → 9 9 9 4 9 9 9 9 9 1 → 9 10 10 10 1 → 10 10 10 4 10 10 10 10 10 1 → 10 11 11 11 1 → 11 11 11 4 11 11 11 11 11 1 → 11 12 12 12 1 → 12 12 12 4 12 1 → 12 12 12 4 → 12 1 → 12 13 13 13 1 13 13 13 4 13 1 → 13 13 13 4 13 1 → 13 14 14 14 5 → 14 14 14 14 1 → 14 14 14 4 14 1 → 14 15 15 15 5 15 15 15 15 1 → 15 15 15 4 15 1 15 16 16 16 5 16 16 16 16 1

232

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

233

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Rate Schedules » Wholesale Power Rate Schedules Services » Rate Schedules » Wholesale Power Rate Schedules Wholesale Power Rate Schedules October 1, 2012 ALA-1-N Wholesale Power Rate Schedule Area: PowerSouth Energy Cooperative System: Georgia-Alabama-South Carolina October 1, 2012 Duke-1-E Wholesale Power Rate Schedule Area: Duke On-System System: Georgia-Alabama-South Carolina October 1, 2012 Duke-2-E Wholesale Power Rate Schedule Area: Central System: Georgia-Alabama-South Carolina October 1, 2012 Duke-3-E Wholesale Power Rate Schedule Area: None System: Georgia-Alabama-South Carolina October 1, 2012 Duke-4-E Wholesale Power Rate Schedule Area: Duke Self-Schedulers System: Georgia-Alabama-South Carolina October 1, 2012 MISS-1-N Wholesale Power Rate Schedule Area: South Mississippi Electric Power Association

234

Scheduling algorithms for arbitrary communication networks  

E-Print Network (OSTI)

We consider the problem of designing scheduling schemes for networks with arbitrary topology and scheduling constraints. We address the optimality of scheduling schemes for packet networks in terms of throughput, delay and ...

Jagabathula, Srikanth

2008-01-01T23:59:59.000Z

235

Equity Evaluation of Vehicle Miles Traveled Fees in Texas  

E-Print Network (OSTI)

to the infrastructure but the money needed to maintain and improve roadways is not being adequately generated. One proposed alternative to the gas tax is the creation of a vehicle miles traveled (VMT) fee; with equity being a crucial issue to consider. This research...

Larsen, Lisa Kay

2012-10-19T23:59:59.000Z

236

University Fees & Financial Planning for Parents and Families  

E-Print Network (OSTI)

, part-time school year, on campus work-study U of T Grants UTAPS, UTM Grant helpful hint: apply) $5,865* $5,865* Incidental Fees $1,365* $1,365* Books/School Supplies $1,000 $1,000 Rent range from approximately $9960 - $13863 (2013-14). · Bioinformatics · Commerce, Management · Computer

Sokolowski, Marla

237

Optimal investment with high-watermark performance fee Karel Janecek  

E-Print Network (OSTI)

Optimal investment with high-watermark performance fee Karel Janecek and Mihai S^irbu January 5, 2011 Abstract We consider the problem of optimal investment and consumption when the investment oppor as a geometric Brownian motion and the performance of the investment and consumption strategy is measured using

Sîrbu, Mihai

238

THE UNIVERSITY OF HONG KONG Payment of Application Fee  

E-Print Network (OSTI)

: "06" Other Fees 4) Enter Bill Account Number: For HSBC / Hang Seng Bank / JETCO: 20999999834001 5 of the following websites: HSBC hsbc.com.hk> Hang Seng Bank JETCO the account transfer function for payment) HSBC: View and Pay Bills Hang Seng Bank: View and Pay Bills JETCO

Tam, Vincent W. L.

239

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9: TRAVEL AND TRANSPORTATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS This schedule covers records documenting the movement of goods and persons...

240

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Energy Savers (EERE)

9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) This schedule covers records documenting the...

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

INSTRUCTIONS for COMPLETING SCHEDULE CARD WEB FORMS  

E-Print Network (OSTI)

Mar 22, 2012 ... Instructions for completing schedule card web forms. The following students are required to complete schedule card web forms. all returning...

Kelly Beranger

2012-03-22T23:59:59.000Z

242

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

20: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

243

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIOVISUAL RECORDS ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS This schedule covers audiovisual and related records created by or for Department and those acquired in...

244

ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIOVISUAL RECORDS (Revision 1) ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) This schedule covers audiovisual and related records created by or for...

245

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

0: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

246

Federal Register /'Vol. 51, No. 243 / Thursday, December 18, 1986 / Proposed Rules fees. Only two fee items on the 1984  

E-Print Network (OSTI)

Federal Register /'Vol. 51, No. 243 / Thursday, December 18, 1986 / Proposed Rules fees. Only two of the Secretary, Room 2215, Interstate Commerce Commission Building, Washington, DC 20423 or call (202) 275- 7428 of energy nor should it have a significant effect on a substantial number of small entities. List

247

,"West Virginia Natural Gas Summary"  

U.S. Energy Information Administration (EIA) Indexed Site

3050WV3","N3010WV3","N3020WV3","N3035WV3","NA1570SWV3","N3045WV3" "Date","West Virginia Natural Gas Wellhead Price (Dollars per Thousand Cubic Feet)","West Virginia Natural Gas...

248

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 12, 2010 January 12, 2010 Training Changing Face of West Virginia's Workforce West Virginia's stimulus funding is expected to spur green jobs and build skills for the future in a state that relies on a nonrenewable energy source -- coal - to employ 35,000 members of its workforce. October 19, 2009 CX-000162: Categorical Exclusion Determination West Virginia State Energy Office CX(s) Applied: A9, A11 Date: 10/19/2009 Location(s): West Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office June 26, 2009 Obama Administration Awards More than $96 Million for State Energy Programs in Ohio, Oregon, Virginia and West Virginia Funding Will Speed Adoption of Efficiency and Renewable Energy Technologies March 26, 2009 Obama Administration Announces Additional $14,003,800 for Local Energy

249

LCLS Operating Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

LCLS Operating Schedule LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 MD ROD AMO MD ROD AMO MD ROD AMO MD ROD AMO ROD 1600-2400 MD MD Commissioning MD MD Commissioning MD MD Commissioning MD MD Commissioning MD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S 0000-0800 MD MD MD MD MD MD MD MD MD 0800-1600 Young MD ROD DiMauro MD ROD Berrah MD ROD Coffee MD ROD Young-II 1600-2400 L018 MD MD L026 MD MD L015 MD MD L027 MD MD L017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Su

250

Wholesale Power Rate Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schedules Schedules Wholesale Power Rate Schedules October 1, 2011 CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU October 1, 2011 CSI-1-H Wholesale Power Rate Schedule Area: Southern Illinois System: CU October 1, 2011 CK-1-H Wholesale Power Rate Schedule Area: KU Area System: CU October 1, 2011 CEK-1-H Wholesale Power Rate Schedule Area: East Kentucky System: CU October 1, 2011 CC-1-I Wholesale Power Rate Schedule Area: CP&L Area, Western Division System: CU September 20, 2011 JW-1-J Wholesale Power Rate Schedule Area: Woodruff Preference Customer System: Jim Woodruff September 20, 2011 JW-2-F Wholesale Power Rate Schedule Area: Florida Power Corporation System: Jim Woodruff November 17, 2010 AP-1-B Wholesale Power Rate Schedule Area: American Electric Power

251

Independent Activity Report, West Valley Demonstration Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 2011 Independent Activity Report, West Valley Demonstration Project - November 2011 November 2011 West Valley Demonstration Project Orientation Visit HIAR-WVDP-2011-11-07...

252

Thanksgiving Goodwill: West Valley Demonstration Project Food...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Thanksgiving Goodwill: West Valley Demonstration Project Food Drive Provides 640 Turkeys to People in Need Thanksgiving Goodwill: West Valley Demonstration Project Food Drive...

253

Independent Activity Report, West Valley Demonstration Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2012 Independent Activity Report, West Valley Demonstration Project - July 2012 July 2012 Operational Awareness Oversight of the West Valley Demonstration Project HIAR...

254

EIA Records Schedule 0011.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECORD SCHEDULE N1-434-94-001 RECORD SCHEDULE N1-434-94-001 EIA Records Schedule N1-434-94-001 Approved by NARA April 3, 1995 (Some surveys are no longer in use. Read notes at bottom of last page) ITEM NO. DESCRIPTION OF RECORDS AUTHORIZED DISPOSITION Item 1) COAL DISTRIBUTION DATA, 1980-1988. This file contains data on the distribution of U.S. coal by coal-producing district of origin, consumer end-use category, state of destination and method of transportation; also included is export shipment information. This is a closed series. Disposition: PERMANENT. Transfer a copy of the data files and documentation to the National Archives upon approval of this schedule by the Archivist of the United States Item 2) HISTORICAL PLANT COST AND ANNUAL PRODUCTION EXPENSE DATA, 1979-1991.

255

On parallel machine scheduling 1  

E-Print Network (OSTI)

On parallel machine scheduling 1 machines with setup times. The setup has to be performed by a single server. The objective is to minimize even for the case of two identical parallel machines. This paper presents a pseudopolynomial

Magdeburg, Universität

256

Task merging for better scheduling  

Science Journals Connector (OSTI)

This paper proposes a new algorithm to restructure task graphs for suitable scheduling. The algorithm reduces communication costs by merging those tasks within a task graph whose communication costs exceeds their execution time. Task duplication techniques ...

Saeed Parsa; Neda Reza Soltani; Saeed Shariati

2009-08-01T23:59:59.000Z

257

Delay tails in MapReduce scheduling  

Science Journals Connector (OSTI)

MapReduce/Hadoop production clusters exhibit heavy-tailed characteristics for job processing times. These phenomena are resultant of the workload features and the adopted scheduling algorithms. Analytically understanding the delays under different schedulers ... Keywords: MapReduce, coupling scheduler, fair scheduler, first in first out, hadoop, heavy-tails, processor sharing

Jian Tan; Xiaoqiao Meng; Li Zhang

2012-06-01T23:59:59.000Z

258

Provably Efficient Two-Level Adaptive Scheduling  

E-Print Network (OSTI)

processor reallocation, our schedulers provide control over the scheduling overhead and ensure effectiveProvably Efficient Two-Level Adaptive Scheduling Yuxiong He1 , Wen-Jing Hsu1 , and Charles E. Multiprocessor scheduling in a shared multiprogramming en- vironment can be structured in two levels, where

Feitelson, Dror

259

Wireless Link Scheduling under Physical Interference Model  

E-Print Network (OSTI)

approximation algorithms for link scheduling with or without power control. Index Terms--Link schedulingWireless Link Scheduling under Physical Interference Model Peng-Jun Wan, Ophir Frieder, Xiaohua Jia: jia@cs.cityu.edu.hk, csfyao@cityu.edu.hk Abstract--Link scheduling is a fundamental problem in multi

Jia, Xiaohua

260

Data:Fee392a9-6caf-4df1-94f3-c4ab26871a3e | Open Energy Information  

Open Energy Info (EERE)

Fee392a9-6caf-4df1-94f3-c4ab26871a3e Fee392a9-6caf-4df1-94f3-c4ab26871a3e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Business Schedule - MMRA-16 (Primary voltage) Sector: Residential Description: Applicable to electric service for the total electrical requirements of master-metered residential apartment complexes where the complex owns, operates, and maintains its own distribution system and distributes electric service to individual family apartments for domestic purposes, and other uses such as central air conditioning and heating, laundry, lighting, and water heating, where all such services are provided only for the apartment complex. Such other uses may be separated from service used within the individual apartment and served on a general service rate schedule. Service hereunder is for the exclusive use of the apartment complex, for itself and its residential tenants and is not to be used for standby, resold, except as may be furnished to its tenants, if no specific charge is made therefor, and is not available to other parties within or without the apartment complex for commercial establishments. Service hereunder shall be supplied at one point of delivery and measured through one meter. Service hereunder is subject to any of Company's rider schedules that may be applicable.

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Fee Determinations: Requirement to Obtain 4 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Attached is Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. POLICY_FLASH_2013-24 disseminating the Dep Sec's memo of Jan 28 2013 on Fee Determ and AEs.pdf Fee Determinations - Requirement to Obtain Acquisition Executive's Input.pdf More Documents & Publications Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule

262

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Fee Determinations: Requirement to Obtain 4 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Attached is Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. POLICY_FLASH_2013-24 disseminating the Dep Sec's memo of Jan 28 2013 on Fee Determ and AEs.pdf Fee Determinations - Requirement to Obtain Acquisition Executive's Input.pdf More Documents & Publications Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule

263

Bringing the User Back into Scheduling: Two Case Studies of Interaction with Intelligent Scheduling Assistants  

E-Print Network (OSTI)

of scheduling, or they demand too much control of an important aspect of the individual's working world. PTIMEBringing the User Back into Scheduling: Two Case Studies of Interaction with Intelligent Scheduling This position paper discusses the scheduling problem as collaboration between human and automated scheduling

Yorke-Smith, Neil

264

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Underground Injection Control (West Virginia) Underground Injection Control (West Virginia) This rule set forth criteria and standards for the requirements which apply to the State Underground Injection Control Program (U.I.C.). The UIC permit program regulates underground injections by 5 classes of wells. All owners or operators of these injection wells must be authorized either by permit or rule by the Director. October 16, 2013 Underground Gas Storage Reservoirs (West Virginia) Lays out guidelines for the conditions under which coal mining operations must notify state authorities of intentions to mine where underground gas is stored as well as map and data requirements, inspection of facilities and penalties. October 16, 2013 Tax Exemption for Wind Energy Generation In March 2007, West Virginia enacted legislation

265

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Qualifying RPS State Export Markets (West Virginia) Qualifying RPS State Export Markets (West Virginia) This entry lists the states with Renewable Portfolio Standard (RPS) policies that accept generation located in West Virginia as eligible sources towards their RPS targets or goals. For specific information with regard to eligible technologies or other restrictions which may vary by state, see the RPS policy entries for the individual states, shown below in the Authority listings. Typically energy must be delivered to an in-state utility or Load Serving Entity, and often only a portion of compliance targets may be met by out-of-state generation. October 16, 2013 Proof of Proper Solid Waste Disposal (West Virginia) This rule provides guidance to persons occupying a residence or operating a business establishment in this state regarding the approved method of

266

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 17, 2010 June 17, 2010 CX-002740: Categorical Exclusion Determination Coal Use By-Product Characterization Lab Decommissioning CX(s) Applied: B3.6 Date: 06/17/2010 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory June 9, 2010 CX-002635: Categorical Exclusion Determination Energy Conservation Measure (ECM) #2: MERC Well Upgrade, National Energy Technology Laboratory Morgantown, West Virginia CX(s) Applied: B5.12 Date: 06/09/2010 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory June 7, 2010 EIS-0445: Notice of Intent to Prepare an Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia June 4, 2010

267

16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security...  

Open Energy Info (EERE)

Abstract These regulations outline the requirements for fees and financial security with the Oil and Gas Division of the Railroad Commission of Texas. Published NA...

268

Recreation Pool Hours and Availability for Rochester INDIVIDUAL GUEST FEES WILL APPLY AT FACILITIES LISTED  

E-Print Network (OSTI)

Recreation Pool Hours and Availability for Rochester INDIVIDUAL GUEST FEES WILL APPLYSp_aquatic.pdf Perinton http://www.perinton.org/Departments/Recreation/PCC Pittsford Pages 1012 http

Portman, Douglas

269

1996 Wholesale Power and Transmission Rate Schedules.  

SciTech Connect

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

270

Argonne National Lab Cleanup schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Takes Steps to Complete Clean-Up of Argonne by 2003; Takes Steps to Complete Clean-Up of Argonne by 2003; Schedule for Shipping Waste to WIPP is 'Good News' for Illinois CARLSBAD, N.M., May 15, 2000 - The U.S. Department of Energy (DOE) reinforced plans to complete the clean-up of its Argonne National Laboratory-East site in Illinois by 2003 by accelerating its schedule for shipping transuranic waste to DOE's permanent disposal site in New Mexico. Previously, the shipments were not expected to begin before 2003. Under the accelerated schedule, shipments to DOE's Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, are expected to begin in Spring 2001 and be completed by the end of the calendar year. Characterization of the waste currently stored at Argonne will begin this October. This agreement is a major step in honoring Argonne and DOE's commitment to the community to

271

NSLS-II Project Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

NSLS-II Project Schedule NSLS-II Project Schedule Major Milestone Event Major Milestone Event Preliminary Schedule CD-0 (approve Mission Need) 4th quarter, FY2005 CD-1 (approve Alternative Selection and Cost Range) 4th quarter, FY2007 CD-2 (approve Performance Baseline) 1st quarter, FY2008 CD-3 (approve Start of Construction) 2nd quarter, FY2009 CD-4 (approve Start of Operations) FY2015 Critical Decisions The five Critical Decisions are major milestones approved by the Secretarial Acquisition Executive or Acquisition Executive that establish the mission need, recommended alternative, Acquisition Strategy, the Performance Baseline, and other essential elements required to ensure that the project meets applicable mission, design, security, and safety requirements. Each Critical Decision marks an increase in commitment of

272

Proposals for Technology Innovation Projects Student technology fees are intended to enhance student learning and the student  

E-Print Network (OSTI)

Proposals for Technology Innovation Projects Student technology fees Technology Committee is allocating a portion of the student technology fees received technology in this context. The committee is particularly looking for projects that

Farritor, Shane

273

Technical Qualification Program Accreditation Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Qualification Program (TQP) Accreditation Schedule Qualification Program (TQP) Accreditation Schedule (Note 1) Year 2013 2014 Month Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec P Site/Office EM Sites/Offices Y Carlsbad Field Office ? Consolidated Business Center Y Office of River Protection (Note 3) ? Office of Site Support and Small Projects N Portsmouth/Paducah Project Office Y Richland Operations Office (Note 3) Y Savannah River Operations Office N Office of Environmental Management SC Sites/Offices

274

Multi-agent Cluster Scheduling for Scalability and Flexibility  

E-Print Network (OSTI)

of clusters scheduling and classical concurrency controlotherwise push control of task scheduling and execution towhich actively controls and modifies scheduling domains as

Konwinski, Andrew David

2012-01-01T23:59:59.000Z

275

Adaptive Scheduling in Ad Hoc and Cellular Wireless Networks  

E-Print Network (OSTI)

2004. 3 Joint Scheduling and Power Control for Multicastingusers. This joint scheduling and power control problem is38 Joint Scheduling and Power Control for Multicasting in

Tan, Choo Chin

2013-01-01T23:59:59.000Z

276

A Hybrid Bin-Packing Heuristic to Multiprocessor Scheduling  

E-Print Network (OSTI)

Abstract. The multiprocessor scheduling problem consists in schedul- ...... parallel machine scheduling", Production Planning and Control 9 (1998), 685{689. 9.

277

Pump-1-A Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-A Wholesale Power Rate Schedule Pump-1-A Wholesale Power Rate Schedule Area: Carters & Russell Pumping System: Georgia-Alabama-South Carolina This rate schedule shall be...

278

Audit/Investigative Records Schedule (Revision 2) | Department...  

Office of Environmental Management (EM)

Investigative Records Schedule (Revision 2) AuditInvestigative Records Schedule (Revision 2) This schedule covers records associated with investigations other than those performed...

279

DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS | Department of...  

Office of Environmental Management (EM)

DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS This schedule provides for the disposition of U.S. Department of Energy (DOE) records...

280

West Virginia/Incentives | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » West Virginia/Incentives < West Virginia Jump to: navigation, search Contents 1 Financial Incentive Programs for West Virginia 2 Rules, Regulations and Policies for West Virginia Download All Financial Incentives and Policies for West Virginia CSV (rows 1 - 62) Financial Incentive Programs for West Virginia Download Financial Incentives for West Virginia CSV (rows 1 - 12) Incentive Incentive Type Active AEP Appalachian Power - Commercial and Industrial Rebate Programs (West Virginia) Utility Rebate Program Yes AEP Appalachian Power - Residential Energy Efficiency Rebate Program (West Virginia) Utility Rebate Program Yes

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Per-Unit Royalty vs Fixed Fee: The Case of Weak Patents  

E-Print Network (OSTI)

Per-Unit Royalty vs Fixed Fee: The Case of Weak Patents Rabah Amiry David Encaouaz Yassine a per-unit royalty or a ...xed fee when her innovation is covered by a weak patent, i.e. a patent of competition is not speci...ed, we show that the patent holder prefers to use a per-unit royalty scheme

Paris-Sud XI, Université de

282

ABOUT CALENDAR FEES ENROLLMENT RECORDS University Home MyUCSC People Calendars A-Z Index  

E-Print Network (OSTI)

ABOUT CALENDAR FEES ENROLLMENT RECORDS University Home MyUCSC People Calendars A-Z Index OFFICE to scholars who have not completed their own search for knowledge, meaning, and understanding CALENDAR FEES ENROLLMENT RECORDS University Home MyUCSC People Calendars A-Z Index OFFICE OF THE REGISTRAR

California at Santa Cruz, University of

283

Optimization of Injection Scheduling in  

E-Print Network (OSTI)

SGP-TR-I12 Optimization of Injection Scheduling in Geothermal Fields James Lovekin May 1987&injection optimization problem is broke$ into two subpmbkm:(1) choosing a configuration of injectorsfrom an existing set is defined as the fieldwide break- through lindex, B. Injection is optimized by choosing injection wells

Stanford University

284

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 7, 2010 April 7, 2010 CX-001435: Categorical Exclusion Determination Building 33 Chemical Resistant Flooring Project CX(s) Applied: B1.3 Date: 04/07/2010 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory April 7, 2010 CX-001434: Categorical Exclusion Determination Building 7 Roof Replacement Project CX(s) Applied: B1.3 Date: 04/07/2010 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory April 7, 2010 CX-001433: Categorical Exclusion Determination Site Perimeter Fencing Project CX(s) Applied: B1.3 Date: 04/07/2010 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory April 2, 2010 W.Va. Mom Sees Benefits of Weatherization

285

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 8, 2011 September 8, 2011 CX-006741: Categorical Exclusion Determination Information Technology Hub Relocation CX(s) Applied: B1.31 Date: 09/08/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory August 22, 2011 CX-006543: Categorical Exclusion Determination Building 40 New Video Surveillance CX(s) Applied: A11, B1.15, B2.3 Date: 08/22/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory August 12, 2011 CX-006480: Categorical Exclusion Determination Materials Research Laboratory (MRL) CX(s) Applied: B3.6 Date: 08/12/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory August 8, 2011 CX-006464: Categorical Exclusion Determination

286

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2011 1, 2011 EIS-0445: DOE Notice of Availability of the Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia March 4, 2011 EIS-0445: EPA Notice of Availability of the Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia March 1, 2011 CX-005336: Categorical Exclusion Determination Materials Synthesis Laboratory Modifications/Additions CX(s) Applied: B3.6 Date: 03/01/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory March 1, 2011 CX-005335: Categorical Exclusion Determination National Energy Technology Laboratory Reciprocating Laboratory Decommissioning CX(s) Applied: B3.6

287

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 28, 2011 June 28, 2011 CX-006117: Categorical Exclusion Determination Flooring Improvements CX(s) Applied: B2.1, B2.5 Date: 06/28/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory June 23, 2011 CX-006129: Categorical Exclusion Determination Optical Sensors Laboratory CX(s) Applied: B3.6 Date: 06/23/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory June 21, 2011 CX-006132: Categorical Exclusion Determination Replacement of Sidewalk Along Collins Ferry Road CX(s) Applied: B1.3 Date: 06/21/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory June 15, 2011 CX-006137: Categorical Exclusion Determination B39 Cellular Repeater Installation

288

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 30, 2010 November 30, 2010 CX-004582: Categorical Exclusion Determination Re-Utilization of Industrial Carbon Dioxide for Algae Production Using a Phase Change Material CX(s) Applied: A9, A11, B3.6 Date: 11/30/2010 Location(s): Triadelphia, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory November 18, 2010 CX-004477: Categorical Exclusion Determination Extreme Drilling Laboratory (XDL) CX(s) Applied: B3.6 Date: 11/18/2010 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory November 18, 2010 CX-004470: Categorical Exclusion Determination Relocation of Laboratory on Morgantown Site from B25/102 to B4/112 CX(s) Applied: B3.6 Date: 11/18/2010 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory

289

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 19, 2010 March 19, 2010 CX-001303: Categorical Exclusion Determination Morgantown B39, Room B73: New Multi-Media Room Construction CX(s) Applied: B1.15 Date: 03/19/2010 Location(s): Morgantown, West Virginia Office(s): National Energy Technology Laboratory March 19, 2010 CX-001305: Categorical Exclusion Determination Site Wide Upgrade to Metering Software CX(s) Applied: A8 Date: 03/19/2010 Location(s): Morgantown, West Virginia Office(s): National Energy Technology Laboratory March 19, 2010 CX-001304: Categorical Exclusion Determination B3 Hot and Chilled Water Pump Upgrades CX(s) Applied: B1.5 Date: 03/19/2010 Location(s): Morgantown, West Virginia Office(s): National Energy Technology Laboratory March 17, 2010 CX-001327: Categorical Exclusion Determination Design/Construction/Installation of Appliance Technology Evaluation Center

290

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carbon Dioxide Sequestration (West Virginia) Carbon Dioxide Sequestration (West Virginia) The purpose of this law is to: October 16, 2013 Building Energy Code ''Much of the information presented in this summary is drawn from the U.S. Department of Energy's (DOE) Building Energy Codes Program and the Building Codes Assistance Project (BCAP). For more detailed information about building energy codes, visit the [http://www.energycodes.gov/states/ DOE] and [http://bcap-ocean.org/ BCAP] websites.'' October 16, 2013 Alternative and Renewable Energy Portfolio Standard In June 2009, West Virginia enacted an ''Alternative and Renewable Energy Portfolio Standard'' that requires investor-owned utilities (IOUs)* with more than 30,000 residential customers to supply 25% of retail electric sales from eligible alternative and renewable energy resources by 2025.

291

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 13, 2010 May 13, 2010 CX-002246: Categorical Exclusion Determination Decommission of B4, 112, Atmospheric Cold Flow Laboratory CX(s) Applied: B1.24, B1.27, B1.31 Date: 05/13/2010 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory May 13, 2010 CX-002573: Categorical Exclusion Determination Millsop Community Center Energy Reduction Renovations CX(s) Applied: B2.5, B1.4, B5.1 Date: 05/13/2010 Location(s): Weirton, West Virginia Office(s): Energy Efficiency and Renewable Energy May 10, 2010 CX-002372: Categorical Exclusion Determination Building 17 and 19 Utility Meter Install CX(s) Applied: B1.15, B2.2 Date: 05/10/2010 Location(s): Morgantown, West Virginia Office(s): National Energy Technology Laboratory April 23, 2010 Recycling Energy Yields Super Savings

292

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 29, 2011 April 29, 2011 CX-005662: Categorical Exclusion Determination The Use of Scrap Tires for Oil Well Stimulation CX(s) Applied: B3.7 Date: 04/29/2011 Location(s): Upper Falls, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory April 13, 2011 CX-005614: Categorical Exclusion Determination Building 33 Chemical Resistant Flooring Project CX(s) Applied: B1.3 Date: 04/13/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory April 13, 2011 CX-005613: Categorical Exclusion Determination Site-Wide Roadway Replacement CX(s) Applied: B1.3 Date: 04/13/2011 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory April 12, 2011 CX-005607: Categorical Exclusion Determination

293

Scheduling & Resources - Power Marketing - Sierra Nevada Region...  

NLE Websites -- All DOE Office Websites (Extended Search)

Marketing > Scheduling & Resources Scheduling & Resources - Greenbook 2004 (PDF - 1.04MB) - CVP Gross Power (XLS - 5.25MB) - CVP BaseResource (XLS - 2.02MB) - WY2002 Analysis (XLS...

294

Human aspects of scheduling : a case study  

E-Print Network (OSTI)

This work presents a look at real-life production-floor scheduling, comparing and contrasting it to both normative OR theory and Cognitive Psychology theory. Relevant literature in OR, scheduling and psychology is reviewed, ...

Boasson, Yishai, 1973-

2006-01-01T23:59:59.000Z

295

schedule6_2001.xls  

Annual Energy Outlook 2012 (EIA)

0 Jun-03 West Phoenix AZ Rudd AZ 14 OH 0 0 0 803 0 U WECC AZN AC 230 230 0 Jun-03 White Tanks AZ Rudd AZ 6 OH 0 0 0 803 0 U WECC AZN AC 230 230 0 Jun-03 Shiprock NM Four Corners NM...

296

schedule6_2002.xls  

Annual Energy Outlook 2012 (EIA)

0 Jun-03 West Phoenix AZ Rudd AZ 14 0 0 0 803 100 U WECC AZN AC 230 230 0 Jun-03 White Tanks AZ Rudd AZ 6 0 0 0 803 100 U WECC AZN AC 230 230 0 Jun-03 Faulkner Sub NV Tolson Sub...

297

Fee Waiver and Reduction Criteria | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Fee Waiver and Reduction Criteria Fee Waiver and Reduction Criteria Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Advisory Exemptions How to Submit a FOIA Request Fee Waiver and Reduction Criteria Electronic Reading Room ISC Conventional Reading Rooms Reference Links Privacy Act Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Freedom of Information Act (FOIA) Fee Waiver and Reduction Criteria Print Text Size: A A A RSS Feeds FeedbackShare Page The FOIA generally requires that requesters pay fees for processing their requests. In accordance with 5 U.S.C 552(a)(4)(A)(iv), an agency is

298

Fees and rebates on new vehicles: Impacts on fuel efficiency, carbon dioxide emissions, and consumer surplus  

Science Journals Connector (OSTI)

Several incentive systems are examined that provide rebates on vehicles with higher-than-average fuel efficiency and levy fees on vehicles with less efficiency. The rebates and fees are applied to new vehicles at the time of purchase, and the rates are set such that the total outlay for rebates equals the revenues from fees. We find that moderately-sized rebates and fees result in a substantial increase in average fuel efficiency. Most of the effect is due to manufacturers' incorporating more fuel-efficiency technologies into the vehicles that they offer, since the rebates and fees effectively lower the price to manufacturers of these technologies. Consumer surplus is found to rise, and the profits of domestic manufacturers are estimated to drop only slightly under most systems and actually to rise under one system.

Kenneth E. Train; William B. Davis; Mark D. Levine

1997-01-01T23:59:59.000Z

299

Data:Fee93627-5be3-4c60-99ef-1677c10c710e | Open Energy Information  

Open Energy Info (EERE)

Fee93627-5be3-4c60-99ef-1677c10c710e Fee93627-5be3-4c60-99ef-1677c10c710e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bay City, Michigan (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: OUTDOOR LIGHTING (Mercury Vapor - 400 watts) Sector: Lighting Description: Rate with Existing Pole(Mercury Vapor - 400 watts) Source or reference: http://www.baycitymi.org/images/Department/electric/pdf/Electric%20Service%20Rate%20Schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

300

Medical Exam Scheduling - HPMC Occupational Health Services  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis Human Reliability Program (HRP) Industrial Rehabilitation & Ergonomics Infection Control & Immunizations Influenza Immunization Program Medical Exam Scheduling Medical...

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Multi-Year Schedule | Department of Energy  

Energy Savers (EERE)

DOE's currently scheduled rulemaking activities for energy conservation standards and test procedures. multiyearscheduleaug2011.pdf More Documents & Publications 9th...

302

ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...  

Office of Environmental Management (EM)

CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL,...

303

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS Budget and...

304

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT Budget and apportionment records...

305

West Valley Demonstration Project Low-Level Waste Shipment |...  

Office of Environmental Management (EM)

West Valley Demonstration Project Low-Level Waste Shipment West Valley Demonstration Project Low-Level Waste Shipment West Valley Demonstration Project Low-Level Waste Shipment...

306

West Virginia Business & Economic Review, Spring 2010 1 West Virginia  

E-Print Network (OSTI)

Virginia Business & Economic Review, Spring 2010 1 prices for Central and Northern Appalachian coal. Natural gas prices are also well down from year-ago levels. Weakening demand for coal also hit the value and Jefferson Counties WV County Population Continues to Struggle By Christiadi The West Virginia Coal Economy

Mohaghegh, Shahab

307

Move Frame Scheduling and Mixed SchedulingAllocation for the Automated Synthesis of Digital Systems y  

E-Print Network (OSTI)

steps: 1) Data path synthe­ sis (operation scheduling and hardware allocation), and 2) Control path design. In the scheduling phase, operations are assigned to the appropriate control steps. The allocaMove Frame Scheduling and Mixed Scheduling­Allocation for the Automated Synthesis of Digital

Nourani, Mehrdad

308

DYNAMIC SCHEDULING M. C. H. Wright  

E-Print Network (OSTI)

for a time interval after which control is returned to the scheduling program to determine the best project who wants more time to evaluate their data can return control to the scheduling program, and come backDYNAMIC SCHEDULING M. C. H. Wright Radio Astronomy Laboratory, University of California, Berkeley

Militzer, Burkhard

309

CPU Inheritance Scheduling Bryan Ford Sai Susarla  

E-Print Network (OSTI)

, providing much greater scheduling flexibil­ ity. Modular, hierarchical control can be provided over systems control the sharing of the machine's CPU resources among threads using a fixed scheduling schemeCPU Inheritance Scheduling Bryan Ford Sai Susarla Department of Computer Science University of Utah

Ford, Bryan

310

CPU Inheritance Scheduling Bryan Ford Sai Susarla  

E-Print Network (OSTI)

, providing much greater scheduling flexibil- ity. Modular, hierarchical control can be provided overCPU Inheritance Scheduling Bryan Ford Sai Susarla Department of Computer Science University of Utah processor scheduling mechanisms in operat- ing systems are fairly rigid, often supportingonly one fixed

Ford, Bryan

311

Models for Train Scheduling Krishna C. Jha  

E-Print Network (OSTI)

Models for Train Scheduling Krishna C. Jha Vice President - Research & Development krishna/analytics, and packaging into web-based map-based interfaces. Innovative Scheduling Overview #12;-3- The train schedule is one of most critical components in the passenger or freight transportations. The quality of a train

Bustamante, Fabián E.

312

Batch Scheduling with Deadlines on Parallel Machines  

E-Print Network (OSTI)

Batch Scheduling with Deadlines on Parallel Machines Peter Brucker Mikhail Y. Kovalyov, Yakov M of scheduling G groups of jobs on m parallel machines is considered. Each group consists of several identical) and to schedule the batches on the machines. It is possible for different batches of the same group

Magdeburg, Universität

313

Flow shop scheduling with peak power consumption constraints  

E-Print Network (OSTI)

Mar 29, 2012 ... Flow shop scheduling with peak power consumption constraints ... Keywords: scheduling, flow shop, energy, peak power consumption, integer...

K. Fang

2012-03-29T23:59:59.000Z

314

Please complete the following information, check the meeting date you plan to attend, and return, along with $15 registration fee (checks or money order only), via mail  

E-Print Network (OSTI)

, along with $15 registration fee (checks or money order only), via mail to: Brittany Dittemore Headwaters

Guiltinan, Mark

315

West Virginia/Geothermal | Open Energy Information  

Open Energy Info (EERE)

West Virginia/Geothermal West Virginia/Geothermal < West Virginia Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF West Virginia Geothermal General Regulatory Roadmap Geothermal Power Projects Under Development in West Virginia No geothermal projects listed. Add a geothermal project. Operational Geothermal Power Plants in West Virginia No geothermal power plants listed. Add a geothermal energy generation facility. Geothermal Areas in West Virginia No areas listed. GRR-logo.png Geothermal Regulatory Roadmap for West Virginia Overview Flowchart The flowcharts listed below were developed as part of the Geothermal Regulatory Roadmap project. The flowcharts cover the major requirements for developing geothermal energy, including, land access, exploration and drilling, plant construction and operation, transmission siting, water

316

TransWest Express Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

operate, maintain and decommission the TransWest Express 600-kV Direct Current Transmission Project. TransWest Express, LLC is a whollyowned subsidiary of the Anschutz...

317

North West Rural Electric Coop | Open Energy Information  

Open Energy Info (EERE)

Coop Coop Jump to: navigation, search Name North West Rural Electric Coop Place Iowa Utility Id 17260 Utility Location Yes Ownership C NERC Location MRO NERC RFC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial - Single Phase Service Rate Commercial Electric Heat Rate Industrial - Single Phase Service Rate Industrial Interruptible Controlled Heat Rate Residential Residential - Single Phase Service Rate Residential Average Rates Residential: $0.0696/kWh Commercial: $0.0501/kWh Industrial: $0.0653/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a"

318

West Valley Demonstration Project Administrative Consent Order, August 27, 1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project (WVDP) Adminstrative Consent Order, August 27, 1.. Page 1 of 15 Project (WVDP) Adminstrative Consent Order, August 27, 1.. Page 1 of 15 EM Home | Regulatory Compliance | Environmental Compliance Agreements West Valley Demonstration Project (WVDP) Adminstrative Consent Order, August 27, 1996 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION AND THE UNITED STATES DEPARTMENT OF ENERGY EPA ID NUMBER NYD980779540 In the Matter of | | UNITED STATES | ORDER DEPARTMENT OF ENERGY, | Docket No. __________ | RESPONDENT | ___________________________| Table of Contents Parties Jurisdiction Purpose and Scope Statement of Facts & Conclusions of Law I. Implementation of the STP II Annual Updates III. Establishing Milestones and Planning Schedule Activity IV. Covered Matters V. Inclusion of New Waste Streams VI. Amendments VII. Project Managers

319

High West Energy, Inc (Wyoming) | Open Energy Information  

Open Energy Info (EERE)

Wyoming) Wyoming) Jump to: navigation, search Name High West Energy, Inc Place Wyoming Utility Id 27058 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1]Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png A F Industrial Commercial & Small Power Commercial Farm and Home Residential Irrigation Industrial Large Power Industrial Security Lighting-150 - 175 watt M V/ HPS Lighting Security Lighting-200 - 250 watt M V/ HPS Lighting Security Lighting-400 watt M V/ HPS Lighting Street Lighting-200 - 250 watt M V/ HPS Lighting

320

High West Energy, Inc (Nebraska) | Open Energy Information  

Open Energy Info (EERE)

Place Nebraska Place Nebraska Utility Id 27058 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png A F Industrial Commercial & Small Power Commercial Security Lighting-150 - 175 watt M V/ HPS Lighting Security Lighting-200 - 250 watt M V/ HPS Lighting Security Lighting-400 watt M V/ HPS Lighting Street Lighting-200 - 250 watt M V/ HPS Lighting Street Lighting-200 - 250 watt M V/ HPS Lighting Street Lighting-400 watt M V/ HPS Lighting Average Rates Residential: $0.1100/kWh Commercial: $0.1040/kWh Industrial: $0.1000/kWh The following table contains monthly sales and revenue data for High West Energy, Inc (Nebraska).

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Weekly Petroleum Status Report Schedule  

Gasoline and Diesel Fuel Update (EIA)

Weekly Petroleum Status Report Weekly Petroleum Status Report Release Schedule The wpsrsummary.pdf, overview.pdf, and Tables 1-14 in CSV and XLS formats, are released to the Web site after 10:30 a.m. (Eastern Time) on Wednesday. All other PDF and HTML files are released to the Web site after 1:00 p.m. (Eastern Time) on Wednesday. Appendix D is produced during the winter heating season, which extends from October through March of each year. For some weeks which include holidays, releases are delayed by one day. Holiday Release Schedule The standard release time and day of the week will be at 10:30 a.m. (Eastern time) on Wednesdays with the following exceptions. All times are Eastern. Data for the week ending Alternate Release Date Release Day Release Time Holiday October 11, 2013 October 21, 2013 Monday 10:30 a.m. Columbus/EIA Closed

322

Microsoft Word - Changes-to-Schedules _Recovered_  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Changes-to-Schedules Changes-to-Schedules REV 5 DOE Administrative Records Schedules Changes Last revised: 12/10/2010 Date DOE Admin Schedule Item(s) Change Authorizing Document 9/15/10 - 12/10/2010 1-6, 9, 11-12, 14, 16-18, 22- 23 Various Removal of items at the end of each schedule for e-mail and word processing copies, which were added to the GRS in Transmittal Number 8. For schedules in which this item is located elsewhere and removal would cause changes in the sequence of item numbers, the item was changed to "Reserved" (Schedules ,4,5, and 14.) GRS Transmittal Number 22 9/15/2010 1 23.b.(3) Deleted citation, 5 CFR 214. GRS Transmittal Number 22 1 25.a. Text deleted "and as described in 29 CFR 1614." GRS Transmittal Number 22

323

Energy Efficiency Programs in West Virginia: A Partnership Approach  

E-Print Network (OSTI)

West Virginia's successful energy efficiency program relies on the close working relationship between the West Virginia Division of Energy and West Virginia University's energy efficiency programs, Industries of the Future - West Virginia and WVU...

Cullen, K. A.; Crowe, E.; Gopalakrishnan, B.; Chaudhari, S.

2011-01-01T23:59:59.000Z

324

This Week In Petroleum Schedule  

U.S. Energy Information Administration (EIA) Indexed Site

This Week In Petroleum Schedule This Week In Petroleum Schedule Holiday Release Schedule for the This Week In Petroleum The standard release time and day of the week will be after 1:00 p. m. (Eastern time) on Wednesdays with the following exceptions. Data for the week ending Alternate Release Date Release Day Release Time Holiday November 8, 2013 November 14, 2013 Thursday after 1:00 p.m. Veterans December 20, 2013 December 27, 2013 Friday after 1:00 p.m. Christmas December 27, 2013 January 3, 2014 Friday after 1:00 p.m. New Year's January 17, 2014 January 23, 2014 Thursday after 1:00 p.m. Martin Luther King Jr. February 14, 2014 February 20, 2014 Thursday after 1:00 p.m. President's May 23, 2014 May 29, 2014 Thursday after 1:00 p.m. Memorial August 29, 2014 September 4, 2014 Thursday after 1:00 p.m. Labor

325

1998 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Tue, Nov 11, 17:00 Wed, Nov 12, '97 17:00 Mon, Nov 17, '97 18:00-Wed, Nov 19, '97 02:00 32 hrs Mon, Dec 01, '97 17:00 Tue, Dec 02, '97 13:00 Mon, Dec 08, '97 06:00-Wed, Dec 10, '97 02:00 44 hrs Mon, Jan 05, 17:00 Tue, Jan 06, 13:00 Mon, Jan 12, 18:00-Wed, Jan 14, 02:00 32 hrs Fri, Jan 16, 17:00 Tue, Jan 20, 13:00 Mon, Jan 26, 06:00-Wed, Jan 28, 02:00 44 hrs Mon, Feb 02, 17:00 Tue, Feb 03, 13:00 Tue, Feb 10, 18:00-Thu, Feb 12, 02:00 32 hrs Tue, Feb 17, 17:00 Wed, Feb 18, 17:00 Mon, Feb 23, 06:00-Wed, Feb 25, 02:00 44 hrs Mon, Mar 02, 17:00 Tue, Mar 03, 13:00 Mon, Mar 09, 18:00-Wed, Mar 11, 02:00 32 hrs Mon, Mar 16, 17:00 Tue, Mar 17, 13:00 Mon, Mar 23, 06:00-Wed, Mar 25, 02:00 44 hrs

326

1997 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 11, '96 17:00 Tue, Nov 12, '96 13:00 Tue, Nov 19, '96 15:00-Wed, Nov 20, '96 02:00 11 hrs Mon, Dec 02, '96 17:00 Tue, Dec 03, '96 13:00 Mon, Dec 09, '96 06:00-Wed, Dec 11, '96 02:00 44 hrs Mon, Jan 06, 17:00 Tue, Jan 07, 13:00 Mon, Jan 13, 18:00-Wed, Jan 15, 02:00 32 hrs Mon, Jan 20, 17:00 Tue, Jan 21, 13:00 Mon, Jan 27, 06:00-Wed, Jan 29, 02:00 44 hrs Mon, Feb 03, 17:00 Tue, Feb 04, 13:00 Tue, Feb 11, 18:00-Thu, Feb 13, 02:00 32 hrs Mon, Feb 18, 09:30 Tue, Feb 18, 13:00 Mon, Feb 24, 06:00-Wed, Feb 26, 02:00 44 hrs Mon, Mar 03, 17:00 Tue, Mar 04, 13:00 Mon, Mar 10, 18:00-Wed, Mar 12, 02:00 32 hrs Mon, Mar 17, 17:00 Tue, Mar 18, 13:00 Mon, Mar 24, 06:00-Wed, Mar 26, 02:00 44 hrs

327

2000 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 08, '99 17:00 Tue, Nov 09, '99 13:00 Mon, Nov 15, '99 18:00-Wed, Nov 17, '99 02:00 32 hrs Mon, Nov 29, '99 17:00 Tue, Nov 30, '99 13:00 Mon, Dec 06, '99 06:00-Wed, Dec 08, '99 02:00 44 hrs Mon, Jan 03, 17:00 Tue, Jan 04, 13:00 Mon, Jan 10, 18:00-Wed, Jan 12, 02:00 32 hrs Fri, Jan 14, 17:00 Tue, Jan 18, 13:00 Mon, Jan 24, 06:00-Wed, Jan 26, 02:00 44 hrs Mon, Feb 14, 17:00 Tue, Feb 15, 17:00 Tue, Feb 22, 06:00-Thu, Feb 24, 02:00 44 hrs Mon, Feb 28, 17:00 Tue, Feb 29, 13:00 Mon, Mar 06, 18:00-Wed, Mar 08, 02:00 32 hrs Mon, Mar 13, 17:00 Tue, Mar 14, 13:00 Mon, Mar 20, 06:00-Wed, Mar 22, 02:00 44 hrs Mon, Apr 10, 17:00 Tue, Apr 11, 13:00 Mon, Apr 17, 06:00-Wed, Apr 19, 02:00 44 hrs

328

2002 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 05, '01 17:00 Tue, Nov 06, '01 13:00 Mon, Nov 12, '01 18:00-Wed, Nov 14, '01 02:00 32 hrs Mon, Dec 03, '01 17:00 Tue, Dec 04, '01 13:00 Mon, Dec 10, '01 06:00-Wed, Dec 12, '01 02:00 44 hrs Mon, Dec 17, '01 09:00 Tue, Dec 18, '01 13:00 Mon, Jan 07, 18:00-Wed, Jan 9, 02:00 32 hrs Mon, Jan 14, 12:00 Tue, Jan 15, 13:00 Tue, Jan 22, 06:00-Thu, Jan 24, 02:00 44 hrs Mon, Jan 28, 17:00 Tue, Jan 29, 17:00 Tue, Feb 05, 18:00-Thu, Feb 07, 02:00 32 hrs Mon, Feb 11, 17:00 Tue, Feb 12, 17:00 Tue, Feb 19, 06:00-Wed, Feb 20, 02:00 20 hrs Mon, Feb 25, 17:00 Tue, Feb 26, 13:00 Mon, Mar 04, 18:00-Wed, Mar 06, 02:00 32 hrs Mon, Mar 11, 17:00 Tue, Mar 12, 13:00 Mon, Mar 18, 06:00-Wed, Mar 20, 02:00 44 hrs

329

1999 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

9 SSRL Accelerator Physics Schedule 9 SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 30, '98 17:00 Tue, Dec 01, '98 13:00 Mon, Dec 07, '98 06:00-Wed, Dec 09, '98 02:00 44 hrs Mon, Jan 04, 17:00 Tue, Jan 05, 13:00 Mon, Jan 11, 18:00-Wed, Jan 13, 02:00 32 hrs Fri, Jan 15, 17:00 Tue, Jan 19, 13:00 Mon, Jan 25, 06:00-Wed, Jan 27, 02:00 44 hrs Mon, Feb 01, 17:00 Tue, Feb 02, 13:00 Tue, Feb 09, 18:00-Thu, Feb 11, 02:00 32 hrs Tue, Feb 16, 17:00 Wed, Feb 17, 17:00 Mon, Feb 22, 06:00-Wed, Feb 24, 02:00 44 hrs Mon, Mar 01, 17:00 Tue, Mar 02, 13:00 Mon, Mar 08, 18:00-Wed, Mar 10, 02:00 32 hrs Mon, Mar 15, 17:00 Tue, Mar 16, 13:00 Mon, Mar 22, 06:00-Wed, Mar 24, 02:00 44 hrs Mon, Apr 12, 17:00 Tue, Apr 13, 13:00 Mon, Apr 19, 06:00-Wed, Apr 21, 02:00 44 hrs

330

West Virginia's 1st congressional district: Energy Resources...  

Open Energy Info (EERE)

West Virginia. Retrieved from "http:en.openei.orgwindex.php?titleWestVirginia%27s1stcongressionaldistrict&oldid191133...

331

Independent Oversight Review, West Valley Demonstration Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review, West Valley Demonstration Project Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 Transportation Emergency Management Review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) The U.S. Department of Energy (DOE) Office of Emergency Management Oversight, within the Secretary of Energy's Office of Independent Oversight and Performance Assurance, conducted a transportation emergency management review of the West Valley Demonstration Project (WVDP) and National Transportation Program (NTP)/Transportation Compliance Evaluation/Assistance Program (TCEAP) in September 2000.

332

West Kentucky Rural E C C | Open Energy Information  

Open Energy Info (EERE)

C C C C Jump to: navigation, search Name West Kentucky Rural E C C Place Kentucky Utility Id 20377 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png General Power Commercial General Power - 50-1000 kW Industrial General Power - Greater than 1000 kW Industrial Residential Residential Average Rates Residential: $0.1110/kWh Commercial: $0.1280/kWh Industrial: $0.0689/kWh References ↑ "EIA Form EIA-861 Final Data File for 2010 - File1_a" Retrieved from "http://en.openei.org/w/index.php?title=West_Kentucky_Rural_E_C_C&oldid=412165

333

Forestry Policies (West Virginia) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Forestry Policies (West Virginia) Forestry Policies (West Virginia) Forestry Policies (West Virginia) < Back Eligibility Agricultural Commercial Program Info State West Virginia Program Type Environmental Regulations Provider Department of Commerce West Virginia's Forests are managed by the State Division of Forestry. In 2010 the State issues its Forest Resource Assessment: http://www.wvforestry.com/DOF100Assessment_Revised_091310_Part1.pdf The report summarizes available woody biomass resources, citing harvesting cost as a limiting factor due to complex terrain. In 2010 the Forestry Division issued the document "Strategic Plan for the sustainability of West Virginia Forests", which included a section summarizing the State Forester's Report to FMRC on the use of wood biomass from West Virginia forests:

334

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 8, 2010 September 8, 2010 Today: Live from the Carbon Capture and Storage Forum Want to know more about carbon capture and sequestration? Here'e how. August 25, 2010 CX-003556: Categorical Exclusion Determination Morgantown Site Metering Installation CX(s) Applied: B2.2 Date: 08/25/2010 Location(s): Morgantown, West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory August 23, 2010 CX-003462: Categorical Exclusion Determination Visitor's Center Conference Room CX(s) Applied: B1.7, B1.15 Date: 08/23/2010 Location(s): Morgantown,West Virginia Office(s): Fossil Energy, National Energy Technology Laboratory August 17, 2010 CX-003427: Categorical Exclusion Determination Research Ridge 4 and 6 Data and Communication Cabling CX(s) Applied: B1.7 Date: 08/17/2010

335

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 18, 2013 April 18, 2013 LM Discusses Management of LTS&M Records The U.S. Department of Energy Office of Legacy Management's (LM) efforts to maintain long-term surveillance and maintenance (LTS&M) records were highlighted during the 2013 Waste Management Symposia held February 24 through 28, in Phoenix, Arizona. April 18, 2013 Legacy Management Business Center January 25, 2013 AVESTAR provides high-quality, hands-on, simulator-based workforce training delivered by an experienced team of power industry training professionals for West Virginia students. | Photo courtesy of the Office of Fossil Energy. National Lab Helping to Train Operators for Next Generation of Power Plants Students in West Virginia are receiving hands-on experience for careers at cleaner-burning coal-fired power plants.

336

Plans and Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appliance & Equipment Standards » About » Plans and Schedules Appliance & Equipment Standards » About » Plans and Schedules Plans and Schedules The Appliances and Equipment Standards program maintains a multi-year rulemaking schedule. The currently scheduled rulemaking activities are described in the program's semi-annual implementation report to Congress. The program will also issue other plans and schedules when needed. The most recent 5-year plan was released in October 2010 and outlines how the program planned to meet all the statutory requirements established in the Energy Policy and Conservation Act of 1975, as amended. Expedited Rulemakings In November 2010, the Department of Energy (DOE) adopted new procedures that enable certain rulemakings to be expedited or improve the efficiency of the rulemaking process:

337

Definition: Net Interchange Schedule | Open Energy Information  

Open Energy Info (EERE)

Interchange Schedule Interchange Schedule Jump to: navigation, search Dictionary.png Net Interchange Schedule The algebraic sum of all Interchange Schedules with each Adjacent Balancing Authority.[1] Related Terms Balancing Authority, Adjacent Balancing Authority, Interchange, Interchange Schedule, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inli LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ne Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Net_Interchange_Schedule&oldid=502531" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

338

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

2) 2) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2011-3 2012-1 2012-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

339

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

1) 1) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2010-3 2011-1 2011-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

340

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

3) 3) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2012-3 2013-1 2013-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Requirements for Using and Administering Cost-plus-award-fee Contracts:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements for Using and Administering Cost-plus-award-fee Contracts: Requirements for Using and Administering Cost-plus-award-fee Contracts: Pre and Post FAC 2005-37 Pre FAC 2005-37 Prior to Federal Acquisition Circular (FAC) 2005-37, which has an effective date of October 14, 2009, the Federal Acquisition Regulation (FAR) required the following in using and administering a cost-plus-award-fee contract: 1. neither a firm-fixed-price nor a fixed-priced incentive contract was appropriate; 2. the limitations on use of a cost reimbursement contract were met; 3. the supplies or services could be acquired at lower costs, and in certain instances, with improved delivery or technical performance, by relating the amount of fee to the contractor's performance; 4. it was neither feasible nor effective to use predetermined objective incentive targets for cost,

342

City of Tucson - Permit Fee Credit for Solar Energy Systems | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Tucson - Permit Fee Credit for Solar Energy Systems City of Tucson - Permit Fee Credit for Solar Energy Systems City of Tucson - Permit Fee Credit for Solar Energy Systems < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State Arizona Program Type Green Building Incentive Provider City of Tucson The City of Tucson passed Resolution No. 20193 on September 27, 2005, to encourage the installation of solar energy systems throughout the city. The resolution established a policy whereby the director of the Department of Planning and Development Services will waive the fee paid by an applicant for a permit for the installation of a qualifying solar system up to $1,000 for a single installation, or $5,000 for a subdivision or multiple project

343

Title 46 Alaska Statutes Section 03.385 Registration Fee for...  

Open Energy Info (EERE)

Registration Fee for Registration of Tanks and Tank Systems Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 46 Alaska...

344

FY 12 Award Fee Determination Scorecard Contractor: B&W Conversion...  

NLE Websites -- All DOE Office Websites (Extended Search)

Fee The first PBI was based on the state of readiness of the Paducah and Piketon Depleted Uranium Hexafluoride (DUF 6 ) conversion plants as of September 30, 2011. BWCS met...

345

Energy performance based connection fees: A case study in New York State  

Science Journals Connector (OSTI)

Energy connection fees and rebates, based on the projected energy load or efficiency of new buildings are currently being considered as a policy option for promoting greater energy efficiency in new construction. In theory, a well designed system of connection fees and rebates could provide states and utilities with a revenue neutral means of creating direct financial incentives for the construction of more energy-efficient buildings. However, a recent case study in New York State found that, in practice, many of the most important features affecting building energy efficiency could not be easily incorporated in connection fee programmes, and that implementation of even a scaled down programme would require a level of administrative commitment and resources which would be difficult to maintain. Instead of implementing connection fee programmes, the authors recommend devoting more resources to an approach based on the combined use of building energy rating systems, enhanced codes with better enforcement, and strategically placed financial incentives and design assistance.

Robert M. Wirtshafter; Eric W. Hildebrandt

1992-01-01T23:59:59.000Z

346

Scheduling of a parallel workload: Implementation and use of the argonne easy scheduler at PDC  

Science Journals Connector (OSTI)

Scheduling of a workload of parallel jobs on a large parallel computer puts specific demands on a scheduling system. Especially if the objective is to give a good service for the largest parallel jobs. In this pa...

Lars Malinowsky; Per ster

1998-01-01T23:59:59.000Z

347

ISSUES REGARDING FEE STRUCTURE FOR THREE ENVIRONMENTAL MANAGEMENT CONTRACTS, CR-B-01-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CR-B-01-01 CR-B-01-01 AUDIT REPORT ISSUES REGARDING FEE STRUCTURE FOR THREE ENVIRONMENTAL MANAGEMENT CONTRACTS MAY 2001 U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES DEPARTMENT OF ENERGY Washington, DC 20585 May 9, 2001 MEMORANDUM FOR THE DIRECTOR, OFFICE OF MANAGEMENT AND ADMINISTRATION FROM: Phillip L. Holbrook (Signed) Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Issues Regarding Fee Structure for

348

[Type text] 2012 Higher Education Units and Fees (version 1) October 2011 Page 1  

E-Print Network (OSTI)

EDUCATION UNITS AND FEES UNIT CODE UNIT TITLE CreditPts EFTSL UnitFeefor 2012/11/10CSP UnitFeeforpre- 2010CSP UnitFeeforpre- 2009CSP UnitFeeforpre- 2008CSP FullTuitionFees fornon-CSP ACH400 RESEARCHFeefor 2012/11/10CSP UnitFeeforpre- 2010CSP UnitFeeforpre- 2009CSP UnitFeeforpre- 2008CSP Full

349

Updated May 7th, 2014 Graduate May 2014 April 2015 Program Specific Tuition Fees  

E-Print Network (OSTI)

.00 $28,160.00 Executive MBA (Global Energy) $106,050.00 $106,050.00 Graduate Programs in Education Ed ­ Educational Psychology Continuing Fees on 4th year onward at anniversary $1,164.00 N/A Master of Counselling-Course Fee (For students not in MPP program) $1,615.98 $2,424.02 MSC in Sustainable Energy Development SEDV

de Leon, Alex R.

350

Updated April 22, 2013 Graduate May 2013 April 2014 Program Specific Tuition Fees  

E-Print Network (OSTI)

,880.72 $27,880.72 Executive MBA (Global Energy) $110,000.00 $110,000.00 Graduate Programs in Education Ed ­ Educational Psychology Continuing Fees on 4th year onward at anniversary $1,152.15 N/A Master of Counselling,217.50 MPP Half-Course Fee (For students not in MPP program) $1,600.00 $2,400.00 MSC in Sustainable Energy

de Leon, Alex R.

351

Robustness in Combinatorial Optimization and Scheduling Theory ...  

E-Print Network (OSTI)

ten years in the area of combinatorial optimization and scheduling theory .... with robust reformulation of optimization model by adapting robust control...

2006-09-26T23:59:59.000Z

352

Scheduling with Fixed Maintenance, Shared Resources and ...  

E-Print Network (OSTI)

Nov 17, 2014 ... The resulting problem is a non-linear scheduling problem with .... Once the grade control plan is constructed we need to solve the utilization...

2014-11-24T23:59:59.000Z

353

EM Quality Assurance Assessment Schedule FY 2010  

Energy.gov (U.S. Department of Energy (DOE))

Attached for planning and coordination purposes is the updated Quality Assurance(QA) assessment schedule for the remainder of fiscal year (FY) 2010.

354

Rate Schedule PACI-T3  

NLE Websites -- All DOE Office Websites (Extended Search)

receipt, adjusted for losses, and delivered to points of delivery. This service includes scheduling and system control and dispatch service needed to support the transmission...

355

Proposal Submittal and Scheduling Procedures Entry Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposal Submittal and Scheduling Procedures for Research at SSRL X-rayVUV Macromolecular Crystallography SSRL is funded by the Department of Energy, Office of Basic Energy...

356

Machine scheduling using the Bees algorithm.  

E-Print Network (OSTI)

??Single-machine scheduling is the process of assigning a group of jobs to a machine. The jobs are arranged so that a performance measure, such as (more)

Phrueksanant, Janyarat

2013-01-01T23:59:59.000Z

357

Construction project scheduling problem with uncertain resource ...  

E-Print Network (OSTI)

... on-going activities. 7 Conclusions and future work .... constrained construction scheduling, Journal of Computing in Civil Engineering, 13(3),. 207-216. [23] Liu...

2004-06-01T23:59:59.000Z

358

Work Schedules | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

job performance, improve morale and help reduce work-related stress, as well as reduce air pollution and traffic congestion. Participation in either the alternate work schedule...

359

ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: PROPERTY DISPOSAL RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) These records pertain to the sales by agencies of real and...

360

ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

activities. Many of these records have continuing historical value after they are no longer of use to the Department. This records schedule covers only disposable records...

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Renewable Fuel Standard Schedule | Open Energy Information  

Open Energy Info (EERE)

Standard Schedule Standard Schedule Jump to: navigation, search Name Renewable Fuel Standard Schedule Sector Liquid Transportation Fuels Spatial Resolution National Geographic Scope United States Temporal Resolution Annual The United States Environmental Protection Agency, under the National Renewable Fuel Standard program and as required by the Energy Independence and Security Act of 2007 (EISA), periodically revises the volumetric standards for cellulosic biofuel, biomass-based diesel, advanced biofuel, and total renewable fuel that must be used in transportation fuel each year. The table below lists the current RFS2 schedule in billions of gallons: Year Renewable Biofuel Advanced Biofuel Cellulosic Biofuel Biomass-based Diesel Undifferentiated Total 2008 9 9

362

APS Long Range Schedule 2000  

NLE Websites -- All DOE Office Websites (Extended Search)

APS FY2000 Beamline Operations Schedule APS FY2000 Beamline Operations Schedule JAN Monday Tuesday Wednesday Thursday Friday Saturday Sunday Week 1 10 11 12 13 14 15 16 0000-0800 SM SM SM SM SM MS MS 0800 - 1600 SM SM SM SM MS MS MS 1600 - 2400 SM SM SM SM MS MS MS Week 2 17 18 19 20 21 22 23 0000 - 0800 MS MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 3 24 25 26 27 28 29 30 0000 - 0800 UO UO UO UO UO UO UO 0800 - 1600 UO MS UO UO UO UO UO 1600 - 2400 UO UO UO UO UO UO UO JAN/FEB 31 1 2 3 4 5 6 0000 - 0800 UO MS MS UO UO UO UO 0800 - 1600 MS MS UO UO UO UO UO 1600 - 2400 MS MS UO UO UO UO UO Week 5 7 8 9 10 11 12 13 0000 - 0800 UO UO UO UO UO UO UO

363

Environmental surveillance master sampling schedule  

SciTech Connect

This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

Bisping, L.E.

1994-02-01T23:59:59.000Z

364

Schedule optimization study implementation plan  

SciTech Connect

This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

Not Available

1993-11-01T23:59:59.000Z

365

Genetic-based scheduling to solve the parcel hub scheduling problem  

Science Journals Connector (OSTI)

The parcel hub scheduling problem (PHSP) is scheduling problem that is common in the parcel delivery industry. The PHSP consists of scheduling a set of inbound trailers containing a batch of heterogeneous parcels to a set of unload docks with the objective ... Keywords: Distribution, Genetic algorithm, Parcel, Sortation, Work load balancing

Douglas L. McWilliams

2009-05-01T23:59:59.000Z

366

An Optimal General Purpose Scheduler for Networked Control Systems  

E-Print Network (OSTI)

An Optimal General Purpose Scheduler for Networked Control Systems Ahmed Elmahdi , Ahmad F Taha to control the time delay is to im- prove the scheduling criterion. This paper proposes an optimal scheduling the stability of the control system. The proposed optimal schedul- ing protocol is a hybrid scheduling criterion

Sun, Dengfeng

367

Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site, IG-0377  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IG-1 IG-1 INFORMATION: Report on "Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site" The Secretary BACKGROUND: During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department's annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth

368

West Virginia | Building Energy Codes Program  

NLE Websites -- All DOE Office Websites (Extended Search)

West Virginia West Virginia Last updated on 2013-08-02 Commercial Residential Code Change Current Code ASHRAE Standard 90.1-2007 Approved Compliance Tools Can use COMcheck State Specific Research Impacts of ASHRAE 90.1-2007 for Commercial Buildings in the State of West Virginia (BECP Report, Sept. 2009) Approximate Energy Efficiency Equivalent to ASHRAE 90.1-2007 Effective Date 09/01/2013 Adoption Date 07/18/2012 Code Enforcement Mandatory DOE Determination Standard 90.1-2007: Yes Standard 90.1-2010: No West Virginia DOE Determination Letter, May 31, 2013 West Virginia State Certification of Commercial and Residential Building Energy Codes Current Code 2009 IECC Approved Compliance Tools Can use REScheck State Specific Research Impacts of the 2009 IECC for Residential Buildings in the State of West Virginia (BECP Report, Sept. 2009)

369

DOE Solar Decathlon: West Virginia University  

NLE Websites -- All DOE Office Websites (Extended Search)

West Virginia University West Virginia University Team website: solar.wvu.edu Photo of members of the West Virginia University Solar Decathlon 2013 team in front of a building on campus. Enlarge image The West Virginia University Solar Decathlon 2013 team (Courtesy of the West Virginia University Solar Decathlon 2013 team) he West Virginia University audiovisual presentation Jury Feedback Architecture Contest Market Appeal Contest Engineering Contest Communications Contest Team Deliverables Project Manual Construction Drawings Menu and Recipes Neither the United States, nor the Department of Energy, nor the Alliance for Sustainable Energy LLC, nor any of their contractors, subcontractors, or their employees make any warranty, express or implied, or assume any legal liability or responsibility for the accuracy, completeness, or

370

West Virginia University 1 Policies and Procedures  

E-Print Network (OSTI)

West Virginia University 1 Policies and Procedures In this Section: · Academic Integrity a Charge of Academic Dishonesty · Appeal Procedures for Cases Involving Academic Dishonesty Academic

Mohaghegh, Shahab

371

Choosing suppliers in North-West Russia.  

E-Print Network (OSTI)

??The purpose of the study was to determine how to choose suppliers in North-West Russia. The aim was to find out whether textbook theories of (more)

Malaki, Mirva

2013-01-01T23:59:59.000Z

372

Retail Store Scheduling for Profit Nicolas Chapadosa  

E-Print Network (OSTI)

Retail Store Scheduling for Profit Nicolas Chapadosa , Marc Joliveaub , Pierre L'Ecuyera , Louis for retail stores has received relatively scant attention. Current approaches typically attempt to minimize the retail scheduling problem in terms of operating profit maximization, explicitly recognizing the dual role

L'Ecuyer, Pierre

373

Online Deadline Scheduling with Bounded Energy Efficiency  

E-Print Network (OSTI)

Online Deadline Scheduling with Bounded Energy Efficiency Joseph Wun-Tat Chan1 , Tak-Wah Lam 2 concern when compared to throughput and the schedules targeted may be very poor in energy efficiency subject to a user-defined threshold of energy efficiency. We first show that all deterministic online

Wong, Prudence W.H.

374

PROJECT SCHEDULING: IMPROVED APPROACH TO INCORPORATE  

E-Print Network (OSTI)

] project scheduling inevitably involves uncertainty. The basic inputs (i.e., time, cost, and resourcesPROJECT SCHEDULING: IMPROVED APPROACH TO INCORPORATE UNCERTAINTY USINC BAYESIAN NETWORKS VAHID, there is a causal relationship between these uncertainty sources and project parameters; this causality

Neil, Martin

375

Modeling realistic hybrid flexible flowshop scheduling problems  

Science Journals Connector (OSTI)

This paper aims to contribute to the recent research efforts to bridge the gap between the theory and the practice of scheduling by modelizing a realistic manufacturing environment and analyzing the effect of the inclusion of several characteristics ... Keywords: Hybrid flexible flowshop, Precedence constraints, Realistic scheduling, Sequence-dependent setup times

Rubn Ruiz; Funda Sivrikaya ?erifo?lu; Thijs Urlings

2008-04-01T23:59:59.000Z

376

Electrical Engineering Technology (EET) LONG RANGE SCHEDULE  

E-Print Network (OSTI)

and Machinery C T C T EET 365W Electrical Power & Machinery Laboratory C C, V V C C, V V EET 370T Energy=Virtual Laboratory, W=Web based This schedule is tentative. All Course offerings are subject to minimum enrollmentElectrical Engineering Technology (EET) LONG RANGE SCHEDULE Course Number and Name Fall 2010 Spr

377

Operations scheduling in job-shops  

E-Print Network (OSTI)

This thesis is in the area of operations scheduling in an automated or semi-automated job-shop system, where parts with various routings contend for service on the resources in the system. The classical job-shop scheduling problem has usually been...

Srinivasan, Anand

2012-06-07T23:59:59.000Z

378

Payment Of the New Mexico Environment Department- Hazardous Waste Bureau Annual Business and Generation Fees Calendar Year 2011  

SciTech Connect

The purpose of this letter is to transmit to the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB), the Los alamos National Laboratory (LANL) Annual Business and Generation Fees for calendar year 2011. These fees are required pursuant to the provisions of New Mexico Hazardous Waste Act, Chapter 74, Article 4, NMSA (as amended). The Laboratory's Fenton Hill Facility did not generate any hazardous waste during the entire year, and is not required to pay a fee for calendar year 2011. The enclosed fee represents the amount for a single facility owned by the Department of Energy and co-operated by the Los Alamos National Security, LLC (LANS).

Juarez, Catherine L. [Los Alamos National Laboratory

2012-08-31T23:59:59.000Z

379

45329 SCHEDULING POSTER.ai  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

These courses have immediate open registraton These courses have immediate open registraton PLEASE LOOK FOR US AT http://energy.gov/dvu/professional-skills-and-technical-training OFFICE OF LEARNING & WORKFORCE DEVELOPMENT Professional Skills & Technical Training Program FY 2014 Corporate Schedule Points of Contact: If you have any logistical/registration questions please contact: Shira Kimble at 202-586-8449 or 301-903-5116. Course Title: Course Date: Time: CHRIS Code: Session: Location: Trustworthy Customer Services NEW January 15-16, 2014 8:30am-4:00pm 002452 0001 Forrestal RM GH- 043 CSRS Retirement Seminar January 28-30, 2014 8:30am-4:00pm 000033 0091 Forrestal RM GH- 043 Managing Up Down & Across February 11-12, 2014

380

SLAC - KEK: ISG8 Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Agenda Agenda ISG8 Home Page Working Groups: WG1: Parameters, Design, Instrumentation and Tuning, Bldg.212 Cascades Conference Rm. WG2: Damping Rings and ATF, Bldg.214 Fuji Conference Rm WG3: RF Sources, Orange Rm (half) WG4:Structures, Orange Rm (half) WG5: Ground Motion; Site Requirements and Investigations, Bldg.281 Conventional Facilities Rm. Monday: 09:00 Plenary Sessions (Auditorium) Welcome - J. Dorfan Views from KEK - K. Takata TRC News - G. Loew Goals for ISG-8 - D. Burke / N. Toge Working Group Plans (5 min ea) - WG Conveners 11:00 Working Group Sessions 12:00 Lunch 13:30 Working Group Sessions Tuesday: 09:00 Daily Schedule Update (Orange Rm) - WG Conveners (5min ea) 09:30 Working Group Sessions 12:00 Lunch 13:30 Working Group Sessions Wednesday:

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Inspection/Sampling Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Inspection/Sampling Schedule Inspection/Sampling Schedule Inspection/Sampling Schedule Site Inspection and Water Sampling Schedules Note: The following schedules are subject to change without prior notice and will be updated periodically. Site Name Inspection Date Sampling Week Ambrosia Lake, NM, Disposal Site August 18, 2014 November 20, 2013 Bluewater, NM, Disposal Site August 18, 2014 November 20, 2013 January 28, 2014 May 12, 2014 Boiling Nuclear Superheater (BONUS), PR, Decommissioned Reactor Site Next event 2017 Burrell, PA, Disposal Site December 9, 2013 November 20, 2013 Canonsburg, PA, Disposal Site December 9, 2013 November 19, 2013 Durango, CO, Disposal Site May 19, 2014 June 2, 2014 Durango, CO, Processing Site N/A June 2, 2014 September 1, 2014 Edgemont, SD, Disposal Site June 23, 2014 N/A

382

Routine Operational Environmental Monitoring schedule, CY 1994  

SciTech Connect

This document provides Health Physics (HP) a schedule in accordance with the Environmental Compliance Manual, WHC-CM-7-5, of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) Program during calendar year (CY) 1994. The survey frequencies for particular sites are determined by the technical judgment of EES and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive waste sites are scheduled to be surveyed annually at a minimum. Any newly discovered waste sites not documented by this schedule will be included in the revised schedule for CY 1995. This schedule does not discuss the manpower needs nor does it list the monitoring equipment to be used in completing specific routines.

Schmidt, J.W.

1993-12-01T23:59:59.000Z

383

EIA RECORDS SCHEDULE (EIARS) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIA RECORDS SCHEDULE (EIARS) EIA RECORDS SCHEDULE (EIARS) EIA RECORDS SCHEDULE (EIARS) The establishment of the Energy Information Administration (EIA) as an independent statistical agency within the U.S. Department of Energy in 1977 was a result of enabling legislation that charged the EIA to maintain a comprehensive data and information program relevant to energy resources and reserves, energy production, energy demand, energy technologies, and related financial and statistical information relevant to the adequacy of energy resources to meet the Nations demands in the near and longer term future EIA RECORDS SCHEDULE (EIARS) More Documents & Publications Request For Records Disposition ADMINISTRATIVE RECORDS SCHEDULE 17: CARTOGRAPHIC, AERIAL PHOTOGRAPHIC, ARCHITECTURAL, ENGINEERING, AND FACILITY MANAGEMENT RECORDS

384

Administrative Records Schedules | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules Administrative Records Schedules NOTE: Most of the files below are in PDF, you will need Acrobat® Reader(tm) to view these files. SCHEDULE TITLE DATE LAST CHANGED AUTHORIZATION NUMBER 1 Personnel Records (pdf) 09/15/10 N1-434-98-4 2 Payroll & Pay Administration Records (pdf) 09/15/10 N1-434-98-5 3 Procurement, Supply, and Grant Records (pdf) 09/15/10 N1-434-98-6 N1-434-95-1 4 Property Disposal Records (pdf) 12/10/10 --- 5 Budget Preparation, Presentation and Apportionment Records (pdf) 12/10/10 N1-434-98-8 6 Accountable Officers' Accounts Records (pdf) 09/15/10 N1-434-98-9 7 Expenditure Accounting Records --- GRS 7 8 Stores, Plants and Cost Accounting Records --- GRS 8

385

Quaternary faults of west Texas  

SciTech Connect

North- and northwest-striking intermontane basins and associated normal faults in West Texas and adjacent Chihuahua, Mexico, formed in response to Basin and Range tectonism that began about 24 Ma ago. Data on the precise ages of faulted and unfaulted Quaternary deposits are sparse. However, age estimates made on the basis of field stratigraphic relationships and the degree of calcic soil development have helped determine that many of the faults that bound the basin margins ruptured since the middle Pleistocene and that some faults probably ruptured during the Holocene. Average recurrence intervals between surface ruptures since the middle Pleistocene appear to be relatively long, about 10,000 to 100,000 yr. Maximum throw during single rupture events have been between 1 and 3 m. Historic seismicity in West Texas is low compared to seismicity in many parts of the Basin and Range province. The largest historic earthquake, the 1931 Valentine earthquake in Ryan Flat/Lobo Valley, had a magnitude of 6.4 and no reported surface rupture. The most active Quaternary faults occur within the 120-km-long Hueco Bolson, the 70-km-long Red Light Bolson, and the > 200-km-long Salt Basins/Wild Horse Flat/Lobo Valley/Ryan Flat.

Collins, E.W.; Raney, J.A. (Univ. of Texas, Austin, TX (United States). Bureau of Economic Geology)

1993-04-01T23:59:59.000Z

386

Distributed and Networked Dynamic Resource Allocation, Scheduling, and Control Experiments  

E-Print Network (OSTI)

Distributed and Networked Dynamic Resource Allocation, Scheduling, and Control Experiments Nicanor into decentralized and networked dynamic resource allocation, scheduling, and control. 2 Questions 1. What, "Experiments for decentralized and networked dynamic resource allocation, scheduling, and control," Submitted

387

Enhancing feedback process scheduling via a predictive control approach  

E-Print Network (OSTI)

Enhancing feedback process scheduling via a predictive control approach Alessandro Vittorio the application possibilities at an affordable additional cost. Keywords: feedback scheduling; control that preemptive process schedulers in multitasking operating systems can be viewed, and above all designed

Como, Giacomo

388

Energy Efficiency Exchange 2015 Schedule | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Schedule Energy Efficiency Exchange 2015 Schedule The schedule for Energy Efficiency Exchange 2015 is available below. Monday, August 10, 2015 12 p.m.-5:30 p.m. Registration...

389

CTV-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CTV-1-H Wholesale Power Rate Schedule CTV-1-H Wholesale Power Rate Schedule Area: Tennessee Valley Authority System: CU This rate schedule shall be available to the Tennessee...

390

CBR-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CBR-1-H Wholesale Power Rate Schedule CBR-1-H Wholesale Power Rate Schedule Area: Big Rivers and Henderson, KY System: CU This rate schedule shall be available to Big Rivers...

391

Contract Number: Performance Period FY2011 FY2012 FY2013 FY2014  

Office of Environmental Management (EM)

Fee Information August 2011 through April 2019 EM Contractor Fee September 2014 West Valley Demonstration Project - West Valley, NY Site: 477,476,867 West Valley...

392

Approximate resolution of a resource-constrained scheduling problem  

E-Print Network (OSTI)

hard resource-constrained scheduling problem which arises in relation to .... schedules in which the temperature is allowed to increase. 5 ...... Systems & Control.

393

A Mathematical approach applied to train scheduling in Brazilian ...  

E-Print Network (OSTI)

Abstract In this paper, a mathematical approach was used to schedule trains in ... Nowadays, due this criticality, the main decision about the train schedule over.

2014-07-15T23:59:59.000Z

394

Parallel machine match-up scheduling with manufacturing cost considerations  

E-Print Network (OSTI)

approach for the single machine scheduling problem. Journaldecisions on parallel CNC machines: -constraint approach.mechanism for the CNC machine scheduling problems with

Aktrk, M. Selim; Atamtrk, Alper; Grel, Sinan

2010-01-01T23:59:59.000Z

395

CSI-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy Savers (EERE)

Area: Southern Illinois System: CU This rate schedule shall be available to Southern Illinois Power Cooperative (hereinafter the Customer). This rate schedule shall be...

396

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: RECORDS COMMON TO MOST OFFICES (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES (Revision 2) This schedule provides for the disposal of certain...

397

ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the...

398

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...  

Office of Environmental Management (EM)

23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This schedule covers those administrative management activities not covered by...

399

PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) PROCEDURE FOR PREPARING RECORDS INVENTORY AND DISPOSITION SCHEDULES (RIDS) This document lists the...

400

West Central North East Area of Tucson  

E-Print Network (OSTI)

0 500 1000 1500 2000 2500 3000 West Central North East Area of Tucson #Individuals Anna Broad-billed Costa Rufous Black-chinned 0 500 1000 1500 2000 2500 3000 West Central North East Area of Tucson not be conflicting, and urban areas may actually provide valuable surrogates for degraded habitats. Our knowledge

Hall, Sharon J.

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

WEST PROJECT AND OPPORTUNITIES FOR US-  

E-Print Network (OSTI)

/extracted energy in a tokamak (1GJ) Several generations of carbon PFCs designed, manufactured and operated Tore loops 15 MW of HF plasma heating Fuelling systems Diagnostics WEST project ~ few days of ITER operation BECOMES WEST Limiter configuration Carbon Two symmetric divertor coils and supporting structures Plasma

402

West Valley Accomplishments: Year in Review  

Energy.gov (U.S. Department of Energy (DOE))

WEST VALLEY, N.Y. EM and its contractor at the West Valley Demonstration Project (WVDP) made significant progress in decommissioning the former nuclear fuel reprocessing center this year, with a focus on preparing for high-level waste (HLW) relocation, deactivation and demolition of site facilities and shipment of waste for off-site disposal.

403

West Virginia University 1 Health Sciences Catalog  

E-Print Network (OSTI)

members, the WVU Health Sciences Center is committed to education, research, service, and patient careWest Virginia University 1 Health Sciences Catalog General Information - West Virginia University and scholarship, and comprehensive health sciences. WVU and its divisional campuses enroll approximately 32

Mohaghegh, Shahab

404

West Michigan Strategic Alliance Greg Northrup, President  

E-Print Network (OSTI)

West Michigan Strategic Alliance Greg Northrup, President 951 Wealthy Street SE P.O. Box 68046 Grand Rapids, MI 49506-1214 Ph: 616-356-6060 Fax: 248-779-0093 Email: president@wm-alliance.org http://www.wm-alliance.org/ The West Michigan Strategic Alliance (WMSA) is a 501 (C)3 not-for-profit organization comprised

405

ORISE Contract, PART I - SCHEDULE, Section G Contract Administration Data  

NLE Websites -- All DOE Office Websites (Extended Search)

G G CONTRACT ADMINISTRATION DATA G.1 CORRESPONDENCE PROCEDURES (OCT 2004) ................................................... 3 G.2 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (MAY 1997) ............... 3 G.3 CONTRACT ADMINISTRATION (MAY 1997).......................................................... 4 G.4 PAYMENT OF BASE FEE AND AWARD FEE (NOV 2004)..................................... 4 Section G - Page 1 of 4 G.5 COST REPORTING REQUIREMENTS INVOLVING RECOVERY ACT ....... 4 PROJECT WORK (APR 2009) G.6 INDIRECT CHARGES INVOLVING RECOVERY ACT PROJECT .................4 WORK (APR 2009) G.7 PAYMENT OF FIXED FEE ..................................................................................4 DE-AC05-06OR23100

406

Rules and Regulations Pertaining to a User Fee System for Point Source Dischargers that Discharge Pollutants into the Waters of the State (Rhode Island)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations establish a user fee system for point source dischargers that discharge pollutants into the surface waters of the State. The funds from such fees are used by the Department of...

407

Independent Oversight Review, Hanford Site K-West Annex Facility...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

K-West Annex Facility - April 2014 Independent Oversight Review, Hanford Site K-West Annex Facility - April 2014 April 2014 Review of the Hanford Site K-West Annex Facility...

408

EP Exploration Place Lot FW Far West Lot  

E-Print Network (OSTI)

PARKING EP Exploration Place Lot W West Lot FW Far West Lot N North Lot NW North West Lot E East FOR THE ARTS (W) University Drive to City Centre Valley Road Coulee Trail Aperture Drive LIBRARY (L) N TURCOTTE

Morris, Joy

409

West Virginia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 1, 2006 December 1, 2006 EIS-0361: EPA Notice of Availability of Environmental Impact Statement Western Greenbrier Co-Production Demonstration Project, Rainelle, WV December 1, 2006 EIS-0361: Draft Environmental Impact Statement Western Greenbrier Co-Production Demonstration Project June 3, 2003 EIS-0361: Notice of Intent to Prepare an Environmental Impact Statement and Notice of Floodplain/Wetlands Involvement Western Greenbrier Co-Production Demonstration Project, Rainelle, West Virginia September 16, 2002 EA-1444: Finding of No Significant Impact Construction of a New Office Building, Childcare Facility, Parking Garage, and Storm water Retention Pond September 2, 2002 EA-1444: Final Environmental Assessment Construction of New Office Building, Child-Care Facility, Parking Garage,

410

Department of Energy - West Virginia  

411

Rate Schedule CV-RFS4  

NLE Websites -- All DOE Office Websites (Extended Search)

RFS4 RFS4 (Supersedes Schedule CV-RFS3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR REGULATION AND FREQUENCY RESPONSE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Regulation and Frequency Response Service (regulation). Character and Conditions of Service: Regulation is necessary to provide for the continuous balancing of resources and interchange with load and for maintaining scheduled interconnection frequency at 60-cycles per second. Formula Rate: The formula rate for regulation includes three components:

412

Enforcement Letter, West Valley Nuclear Services- March 30, 1998  

Energy.gov (U.S. Department of Energy (DOE))

Issued to West Valley Nuclear Services related to Hazard Analysis, Design Review, Work Control Implementation, and a Contamination Event at the West Valley Demonstration Project

413

2012 Annual Planning Summary for West Valley Demonstration Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project 2012 Annual Planning Summary for West Valley Demonstration Project The ongoing and projected Environmental Assessments and Environmental Impact...

414

FTCP Site Specific Information - West Valley Demonstration Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Demonstration Project FTCP Site Specific Information - West Valley Demonstration Project Annual Workforce Analysis and Staffing Plan Report Calendar Year 2012...

415

U.S. Fish and Wildlife Service - Shepherdstown, West Virginia...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fish and Wildlife Service - Shepherdstown, West Virginia U.S. Fish and Wildlife Service - Shepherdstown, West Virginia Photo of U.S. Fish and Wildlife Service National Conservation...

416

Demand Response National Trends: Implications for the West? ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Trends: Implications for the West? Demand Response National Trends: Implications for the West? Committee on Regional Electric Power Cooperation. San Francisco, CA. March...

417

Iowa: West Union Green Transformation Project | Department of...  

Office of Environmental Management (EM)

West Union Green Transformation Project Iowa: West Union Green Transformation Project March 17, 2014 - 11:26am Addthis Utilizing funding from EERE and cost shares from other...

418

The licensing of patents in return for a fee or royalties has a key role in drug discovery.  

E-Print Network (OSTI)

The licensing of patents in return for a fee or royalties has a key role in drug discovery. Now the licensee brings out a new product, it may be unclear whether they need to pay royalty fees to the patentee patents in exchange for royalty payments; however, they disputed whether the licence of two patents

Cai, Long

419

City of Santa Monica - Building Permit Fee Waiver for Solar Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » City of Santa Monica - Building Permit Fee Waiver for Solar Projects City of Santa Monica - Building Permit Fee Waiver for Solar Projects < Back Eligibility Commercial Construction Installer/Contractor Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State California Program Type Green Building Incentive Provider City of Santa Monica In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff from the Solar Santa Monica office, the city released their [http://www.solarsantamonica.com/documents/PVSubmittalRequirement2010.pdf

420

Definition: Scheduling Path | Open Energy Information  

Open Energy Info (EERE)

Scheduling Path Scheduling Path Jump to: navigation, search Dictionary.png Scheduling Path The Transmission Service arrangements reserved by the Purchasing-Selling Entity for a Transaction.[1] Related Terms transmission lines, Purchasing-Selling Entity, Transmission Service, transmission line References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Scheduling_Path&oldid=480301" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation:

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Definition: Interchange Schedule | Open Energy Information  

Open Energy Info (EERE)

Schedule Schedule Jump to: navigation, search Dictionary.png Interchange Schedule An agreed-upon Interchange Transaction size (megawatts), start and end time, beginning and ending ramp times and rate, and type required for delivery and receipt of power and energy between the Source and Sink Balancing Authorities involved in the transaction.[1] Related Terms Interchange transaction References ↑ Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Interchange_Schedule&oldid=480572" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link

422

DOE HQ Shuttle Bus Route and Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Shuttle Bus Route and Schedule Shuttle Bus Route and Schedule The DOE Shuttle Buses follow the same schedules between the two main Headquarters locations, Forrestal and Germantown. The buses start their routes at each Headquarters facility at the same times, see the schedule below. The subsequent stops at the other facilities are relative to the departure time of each route. Headquarters employees are reminded of the statutory provisions that authorize and limit the use of the shuttle bus service. Specific authority for the use of appropriated funds to pay for transportation for official purposes is contained in section 1344(a)(1) of Title 31, U.S. Code. Use of this transportation for any other purpose is

423

Undergraduate Program Time Limits and Work Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Time Limits and Work Schedules Time Limits and Work Schedules Undergraduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time limits The length of participation in the undergraduate program is limited to a maximum of six years for students pursuing a bachelor's degree and three years for students pursuing an associate's degree. Work schedules Year-round students Students participating in some special undergraduate programs, post-baccalaureate appointments, post-master's appointments, and GRA students working on a thesis or dissertation are excluded from the 30-hour per week work restriction.

424

Graduate Program Time Limits and Work Schedules  

NLE Websites -- All DOE Office Websites (Extended Search)

Time Limits and Work Schedules Time Limits and Work Schedules Graduate Program Time Limits and Work Schedules Point your career towards LANL: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Contact Student Programs (505) 665-8899 Email Time Limits The length of participation in the graduate program is limited as follows: With a bachelor's pursuing a master's degree: 4 years With a bachelor's pursuing a PhD: 7 years With a master's pursuing a second master's degree: 2 years With a master's pursuing a PhD: 4 years With a master's pursuing a master's and PhD in a new field: 6 years Students may remain in the GRA program for up to three months after receiving their PhD. Work schedules Year-round students Students participating in the MBA program, post-baccalaureate appointments,

425

APCF Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APCF APCF Past APCF Memoranda APCF, Construction Schedule This is a tentative schedule of the daily construction at APCF. For the preliminary two to three week look ahead schedule, please click the PDF calendar to the left. The potential for ground vibration is noted in the "Impact" column (None, Small, Moderate, High, Very High). Daily schedule for dates up to 01.17.2014 Day Activity Impact Monday - 08.05.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Site Grading Low Tuesday - 08.06.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Wednesday - 08.07.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Thursday - 08.08.13 Studs and Drywall None Ceiling Piping None Curtain Wall None

426

Batch Queues and Scheduling Policies on Edison  

NLE Websites -- All DOE Office Websites (Extended Search)

Queues and Policies Queues and Scheduling Policies Users submit jobs to a submit queue and wait in line until nodes become available to run a job. NERSC's queue structures are...

427

Transportation resource scheduling in food retail industry  

E-Print Network (OSTI)

The objective of this thesis is to find an appropriate analytical method for scheduling the daily driver tasks in the grocery industry. The goal is to maximize driver utilization. A "Bin-packing" approach is employed to ...

Akkas, Arzum, 1978-

2004-01-01T23:59:59.000Z

428

Production Scheduling with Energy Efficiency Constraints  

E-Print Network (OSTI)

This research is motivated by a real world production scheduling problem in a continuous manufacturing system involving multiple objectives, multiple products and multiple processing lines with various inventory, production and energy efficiency...

Lee, J.; Kozman, T. A.; Wang, X.

2007-01-01T23:59:59.000Z

429

DOE Announces New WIPP Tour Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Announces New WIPP Tour Schedule CARLSBAD, N.M., March 14, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced changes in the public tour program at...

430

Provably Efficient Adaptive Scheduling for Parallel Jobs  

E-Print Network (OSTI)

Scheduling competing jobs on multiprocessors has always been an important issue for parallel and distributed systems. The challenge is to ensure global, system-wide efficiency while offering a level of fairness to user ...

He, Yuxiong

431

PARS II Training Schedule | Department of Energy  

Office of Environmental Management (EM)

will certify that user to receive a PARS II user account. PARSIITrainingSchedule03-06-2014.pdf More Documents & Publications Slide 1 Slide 1 PARS II Course Registration Form...

432

Scheduling of Mobile Robots with Preemptive Tasks  

Science Journals Connector (OSTI)

This paper deals with the problem of scheduling of mobile robots taking into account preemption cases in a ... capability of transporting materials between some machines, mobile robots are able to perform manufac...

Izabela Nielsen; Quang-Vinh Dang

2014-01-01T23:59:59.000Z

433

Online optimization in routing and scheduling  

E-Print Network (OSTI)

In this thesis we study online optimization problems in routing and scheduling. An online problem is one where the problem instance is revealed incrementally. Decisions can (and sometimes must) be made before all information ...

Wagner, Michael R. (Michael Robert), 1978-

2006-01-01T23:59:59.000Z

434

WEBVIEWER INSTRUCTION PACKET Facilities Planning and Scheduling  

E-Print Network (OSTI)

-mail: scheduling@mail.wvu.edu Website: http://facilitiesscheduling.wvu.edu http://webviewer.wvu.edu #12;2 WebViewer: Detailed Instructions Table of Contents Purpose of WebViewer.................................................................................................................................3 Tour of Web

Mohaghegh, Shahab

435

Rate Schedule CV-EID4  

NLE Websites -- All DOE Office Websites (Extended Search)

EID4 EID4 (Supersedes Schedule CV-EID3) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR ENERGY IMBALANCE SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Energy Imbalance (EI) service. Character and Conditions of Service: EI is provided when a difference occurs between the scheduled and the actual delivery of energy to a load within the Sub-Balancing Authority (SBA) over an hour or in accordance with approved policies and procedures. The deviation, in megawatts, is the net scheduled amount of

436

Project Schedule Optimization in a Telecommunications Environment  

E-Print Network (OSTI)

Veritas Corporation is a thriving company in the fast-paced telecommunications industry. To keep up with the dynamic industry, a significant quantity of projects must be scheduled in a short time period without impacting ...

Taliaferro, Chris

2013-12-20T23:59:59.000Z

437

Knowledge-Based Design of Scheduling Systems Jrgen Sauer  

E-Print Network (OSTI)

have to decide and control within the scheduling process. In different application areas scheduling1 Knowledge-Based Design of Scheduling Systems Jürgen Sauer Universität Oldenburg, FB Informatik Escherweg 2 D-26121 Oldenburg, Germany sauer@informatik.uni-oldenburg.de Abstract A Scheduling system shall

Appelrath, Hans-Jürgen

438

Survey of Gain-Scheduling Analysis & Design WE.Leithead  

E-Print Network (OSTI)

ranging from aerospace to process control. Despite the wide application of gain-scheduling controllers of gain-scheduling controllers and a diverse academic literature relating to gain- scheduling extendingSurvey of Gain-Scheduling Analysis & Design D.J.Leith WE.Leithead Department of Electronic

Duffy, Ken

439

West Virginia: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

West Virginia: Energy Resources West Virginia: Energy Resources Jump to: navigation, search Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.5976262,"lon":-80.4549026,"alt":0,"address":"West

440

West Texas Intermediate Spot Average ............................  

U.S. Energy Information Administration (EIA) Indexed Site

Crude Oil (dollars per barrel) Crude Oil (dollars per barrel) West Texas Intermediate Spot Average ............................ 102.88 93.42 92.24 87.96 94.34 94.10 105.84 96.30 95.67 95.33 95.67 93.33 94.12 97.64 95.00 Brent Spot Average ........................................................... 118.49 108.42 109.61 110.09 112.49 102.58 110.27 108.29 106.33 105.00 103.00 102.00 111.65 108.41 104.08 Imported Average .............................................................. 108.14 101.18 97.18 97.64 98.71 97.39 103.07 100.03 99.64 99.33 99.69 97.35 101.09 99.85 99.04 Refiner Average Acquisition Cost ...................................... 107.61 101.44 97.38 97.27 101.14 99.45 105.24 100.44 100.15 99.82 100.18 97.83 100.83 101.61 99.50 Liquid Fuels (cents per gallon) Refiner Prices for Resale Gasoline .........................................................................

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

AMF Deployment, Niamey, Niger, West Africa  

NLE Websites -- All DOE Office Websites (Extended Search)

West Africa West Africa Niamey Deployment AMF Home Niamey Home Data Plots and Baseline Instruments RADAGAST Website Rainfall Record (PDF) Publications List, (PDF) Experiment Planning RADAGAST Proposal Outreach Fact Sheets RADAGAST (PDF) Annual Climate Cycle in Niger, Africa (PDF) Posters AMF Poster, French Version We're Going to Sample the Sky in Africa! News Campaign Images AMMA International News AMF Deployment, Niamey, Niger, West Africa In 2006, the ARM Mobile Facility is collecting cloud and atmospheric property measurements from a location near the airport in Niamey, Niger, West Africa. Main Site: 13° 28' 39.15" N, 2° 10' 27.62" E Altitude: 205 meters Ancillary Site: 13° 31' 19.14" N, 2° 37' 56.46" E Altitude: 228.29 meters In January 2006, the second deployment of the ARM Mobile Facility (AMF)

442

Categorical Exclusion Determinations: West Valley Demonstration Project |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Valley Demonstration Valley Demonstration Project Categorical Exclusion Determinations: West Valley Demonstration Project Categorical Exclusion Determinations issued by West Valley Demonstration Project. DOCUMENTS AVAILABLE FOR DOWNLOAD July 11, 2013 CX-010718: Categorical Exclusion Determination Replacement Ventilation System for the Main Plant Process Building CX(s) Applied: B6.3 Date: 07/11/2013 Location(s): New York Offices(s): West Valley Demonstration Project December 20, 2012 CX-009527: Categorical Exclusion Determination WVDP-2012-02 Routine Maintenance CX(s) Applied: B1.3 Date: 12/20/2012 Location(s): New York Offices(s): West Valley Demonstration Project August 2, 2012 CX-009528: Categorical Exclusion Determination WVDP-2012-01 WVDP Reservoir Interconnecting Canal Maintenance Activities

443

Environmental Justice Activities: Community Leaders' Institute, West  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Justice Activities: Community Leaders' Institute, Environmental Justice Activities: Community Leaders' Institute, West Columbia, South Carolina Environmental Justice Activities: Community Leaders' Institute, West Columbia, South Carolina July 13, 2012 - 3:06pm Addthis Environmental Justice Activities: Community Leaders' Institute, West Columbia, South Carolina What does this project do? Goal 1. Protect human health and the environment The Midlands Community Leaders' Institute (CLI), sponsored by the Medical University of South Carolina, the U.S. Department of Energy, U.S. Department of Defense, South Carolina State University, and Brookland Baptist Church was held in West Columbia, South Carolina, on July 13 and 14, 2012. The CLI continued to build on the theme Building and Sustaining Healthy Communities. A critical factor in the success of community development

444

West Winds Wind Farm | Open Energy Information  

Open Energy Info (EERE)

West Winds Wind Farm West Winds Wind Farm Facility West Winds Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Caithness Developer SeaWest Energy Purchaser Southern California Edison/PacifiCorp Location San Gorgonio CA Coordinates 33.9095°, -116.734° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.9095,"lon":-116.734,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

445

Mid-West Electric Consumers Association  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mid-West Electric Consumers Association Mid-West Electric Consumers Association 4350 Wadsworth Blvd., Suite 330, Wheat Ridge, CO 80033 Tel: (303) 463-4979 Fax: (303) 463-8876 April 1, 2009 Transmission Infrastructure Program Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Comments on the Proposed Adoption of a Transmission Infrastructure Program The Mid-West Electric Consumers Association appreciates the opportunity to comment on the Western Area Power Administration's ("Western" or "WAPA") two Federal Register notices: Notice of Proposed Program and Request for Public Comments, and Notice of Availability of Request for Interest (FRN), published March 4, 2009 (pp. 9392-9393). The Mid-West Electric Consumers Association was founded in 1958 as the regional

446

WestStart CALSTART | Open Energy Information  

Open Energy Info (EERE)

WestStart CALSTART WestStart CALSTART Jump to: navigation, search Name WestStart-CALSTART Place Pasadena, California Zip 91106 Product String representation "WestStart-CALST ... nd create jobs." is too long. Coordinates 29.690847°, -95.196308° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.690847,"lon":-95.196308,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

447

West Virginia University | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Virginia University West Virginia University West Virginia University July 7, 2005 - 2:04pm Addthis Remarks by Energy Secretary Samuel Bodman Thank you, President Hardesty. I visited West Virginia last year when I was with the Treasury Department, and I am glad to be back today. President Hardesty has had a pretty busy week hosting visitors from Washington. President Bush was here on Monday, and I imagine many of you were in the audience for that. So I thank you for showing up for another speech a few days later. It is my pleasure to announce today that the Department of Energy is awarding almost $3 million in research funding, as part of our University Coal Research Program, to 19 universities in 15 states. Now in its 26th year, the University Coal Research Program brings science students and

448

West Virginia University | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Virginia University West Virginia University West Virginia University July 7, 2005 - 2:04pm Addthis Remarks by Energy Secretary Samuel Bodman Thank you, President Hardesty. I visited West Virginia last year when I was with the Treasury Department, and I am glad to be back today. President Hardesty has had a pretty busy week hosting visitors from Washington. President Bush was here on Monday, and I imagine many of you were in the audience for that. So I thank you for showing up for another speech a few days later. It is my pleasure to announce today that the Department of Energy is awarding almost $3 million in research funding, as part of our University Coal Research Program, to 19 universities in 15 states. Now in its 26th year, the University Coal Research Program brings science students and

449

West South Central | OpenEI  

Open Energy Info (EERE)

West South Central West South Central Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 7, and contains only the reference case. The dataset uses quadrillion btu. The data is broken down into residential, commercial, industrial, transportation, electric power and total energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Energy Consumption West South Central Data application/vnd.ms-excel icon AEO2011: Energy Consumption by Sector and Source - West South Central- Reference Case (xls, 297.7 KiB) Quality Metrics Level of Review Peer Reviewed Comment Temporal and Spatial Coverage Frequency Annually

450

Qualifying RPS State Export Markets (West Virginia)  

Energy.gov (U.S. Department of Energy (DOE))

This entry lists the states with Renewable Portfolio Standard (RPS) policies that accept generation located in West Virginia as eligible sources towards their RPS targets or goals. For specific...

451

Corporate Headquarters Tax Credit (West Virginia)  

Energy.gov (U.S. Department of Energy (DOE))

The Corporate Headquarters Tax Credit is available to companies who relocate their corporate headquarters to West Virginia and create 15 new jobs. The credit can offset up to 100% of the tax...

452

Mid-West Electric Consumers Association  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Electric Consumers Association 4350 Wadsworth Blvd., Suite 330, Wheat Ridge, CO 80033 Tel: (303) 463-4979 Fax: (303) 463-8876 April 1, 2009 Transmission Infrastructure Program...

453

West Virginia University 1 Freshman Program  

E-Print Network (OSTI)

West Virginia University 1 Freshman Program E-mail: Statler-freshman@mail.wvu.edu Nature of Program Program focuses on: (1) careful advising and accurate placement of students into courses

Mohaghegh, Shahab

454

West Virginia University 1 In this section  

E-Print Network (OSTI)

West Virginia University 1 Minors In this section: � General Statement � Rationale � Requirements to assure that completion of a minor is appropriately recognized and posted to the student's transcript: 1

Mohaghegh, Shahab

455

West Virginia University 1 In this section  

E-Print Network (OSTI)

West Virginia University 1 FERPA In this section: � Notice to Students Regarding FERPA not contractually affiliated with the University. Use and disclosure of this information shall be limited to (1

Mohaghegh, Shahab

456

Gravity Data for west-central Colorado  

DOE Data Explorer (OSTI)

West -108.366692 East -105.478847 North 40.932361 South 36.961606 Data from From University of Texas: Pan American Center for Earth and Environmental Studies

Zehner, Richard

457

Linked Deposit Loan Program (West Virginia)  

Energy.gov (U.S. Department of Energy (DOE))

The Linked Deposit Loan Program is targeted at small, private firms with 50 or fewer employees and gross annual revenues of $5 million or less comes. This loan offered through the West Virginia...

458

West Nile Encephalitis in Humans and Horses  

E-Print Network (OSTI)

Humans and horses are infected with West Nile Encephalitis after being bitten by mosquitoes that transmit the virus. Migratory birds are thought to be responsible for the introduction of the virus into new areas. This publication explains...

Lawhorn, D. Bruce

2000-08-25T23:59:59.000Z

459

West Wide Programmatic Environmental Impact Statement Record...  

Open Energy Info (EERE)

LibraryAdd to library Legal Document- OtherOther: West Wide Programmatic Environmental Impact Statement Record of Decision (BLM)Legal Published NA Year Signed or Took Effect...

460

West Stevens Wind | Open Energy Information  

Open Energy Info (EERE)

West Stevens Wind West Stevens Wind Facility West Stevens Wind Sector Wind energy Facility Type Commercial Scale Wind Facility Status Under Construction Developer West Stevens Wind Location 3 miles northwest of Chokio MN Coordinates 45.606472°, -96.238174° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.606472,"lon":-96.238174,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

west north central | OpenEI  

Open Energy Info (EERE)

west north central west north central Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 24, and contains only the reference case. The dataset uses million metric tons carbon dioxide equivalent. The data is broken down into residential, commercial, industrial, transportation, electric power, and total by fuel. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO carbon dioxide emissions EIA west north central Data application/vnd.ms-excel icon AEO2011: Carbon Dioxide Emissions by Sector and Source - West North Central- Reference Case (xls, 74.3 KiB) Quality Metrics Level of Review Peer Reviewed Comment

462

TransWest Old | Open Energy Information  

Open Energy Info (EERE)

TransWest Old TransWest Old Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: TransWest Old EIS at {{{GeothermalArea}}} for {{{GeothermalDevelopmentPhases}}} {{{NEPA_Name}}} General NEPA Document Info Environmental Analysis Type EIS Applicant Geothermal Area {{{GeothermalArea}}}"{{{GeothermalArea}}}" cannot be used as a page name in this wiki. Project Location Project Phase Techniques Time Frame (days) Participating Agencies Lead Agency none provided Funding Agency none provided Managing District Office none provided Managing Field Office none provided Funding Agencies none provided Surface Manager none provided Mineral Manager none provided Selected Dates Relevant Numbers Lead Agency Doc Number Retrieved from "http://en.openei.org/w/index.php?title=TransWest_Old&oldid=686707"

463

West Valley Demonstration Project Site Environmental Report Calendar Year 2000  

SciTech Connect

The annual site environmental monitoring report for the West Valley Demonstration Project nuclear waste management facility.

NONE

2001-08-31T23:59:59.000Z

464

Enterprise Assessments Review, West Valley Demonstration Project December 2014  

Energy.gov (U.S. Department of Energy (DOE))

Review of the West Valley Demonstration Project Emergency Management Program Technical Basis and Emergency Preparedness

465

FILM AND VIDEO COLLECTION SCHEDULING REQUEST Date: Send To: Video Scheduling  

E-Print Network (OSTI)

FILM AND VIDEO COLLECTION SCHEDULING REQUEST Date: Requestor: Send To: Video Scheduling Film and Video Collection Department University of Delaware Library (302) 831-8419 FAX (302) 831-6197 Media within seven days, please check out media at the Film and Video Collection Department Service Desk

Cakoni, Fioralba

466

Reducing Pausing at Rich-to-Lean Schedule Transitions: Effects of Variable-Ratio Schedules and Noncontingent Timeouts  

E-Print Network (OSTI)

-schedule component), which may maintain responding in the lean component when there is insufficient reinforcement. 4 General Introduction The Basic Problem: Pausing on FR Schedules Fixed-ratio (FR) schedules require that a certain number of responses occur.... In the context of a FR schedule, pausing may be considered counterproductive (or maladaptive) because it postpones the receipt of a reinforcer for a food-deprived organism. A host of variables affect pausing on FR schedules; for example, pausing increases as a...

Brewer, Adam Thornton

2012-08-31T23:59:59.000Z

467

Alternative Fuels Data Center: West Virginia Points of Contact  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

West Virginia Points West Virginia Points of Contact to someone by E-mail Share Alternative Fuels Data Center: West Virginia Points of Contact on Facebook Tweet about Alternative Fuels Data Center: West Virginia Points of Contact on Twitter Bookmark Alternative Fuels Data Center: West Virginia Points of Contact on Google Bookmark Alternative Fuels Data Center: West Virginia Points of Contact on Delicious Rank Alternative Fuels Data Center: West Virginia Points of Contact on Digg Find More places to share Alternative Fuels Data Center: West Virginia Points of Contact on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type West Virginia Points of Contact The following people or agencies can help you find more information about West Virginia's clean transportation laws, incentives, and funding

468

Office of Inspector General report on audit of Department of Energy management and operating contractor available fees  

SciTech Connect

The Office of Procurement and Assistance Management has proposed changes to the method used to annually calculate and negotiate ``for profit`` management and operating contractor available fees. This proposal will increase contractor fees in exchange for the contractor`s purported assumption of additional risk. In 1991, the Department, through the Accountability Rule, increased contractor fees as an incentive to improve contractor performance and accountability. Despite the lack of measurable benefits of this effort, the Department is crafting a new fee policy which will, depending upon how it is executed, increase fees above the amount provided through the Accountability Rule as an incentive to the Department`s management and operating contractors. The objective of the audit was to determine whether the Department`s proposed change to the fee structure for determining management and operating contractor fees will be cost effective. This report describes the study`s approach, its findings and recommendations, management and auditor comments, and includes appendices with further data.

NONE

1996-05-01T23:59:59.000Z

469

Report on Audit of Department of Energy Management and Operating Contractor Available Fees, IG-0390  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF DEPARTMENT OF ENERGY MANAGEMENT AND OPERATING CONTRACTOR AVAILABLE FEES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative address: Department of Energy Headquarters Gopher

470

Page 1 of 2 2014-15 Postgraduate Tuition Fees for Institute of Petroleum  

E-Print Network (OSTI)

Page 1 of 2 2014-15 Postgraduate Tuition Fees for Institute of Petroleum Engineering programmes Programme title Award FT PT FT PT FT PT Petroleum Geoscience MSc / PGDip £9,720 - £11,470 - £25,920 - Petroleum Engineering MSc / PGDip £9,720 - £11,470 - £25,920 - Reservoir Evaluation & Management MSc / PGDip

Painter, Kevin

471

Page 1 of 3 2013-14 Postgraduate Tuition Fees for Institute of Petroleum  

E-Print Network (OSTI)

Page 1 of 3 2013-14 Postgraduate Tuition Fees for Institute of Petroleum Engineering programmes Overseas Home/EU Overseas Programme title Award FT PT FT PT FT PT FT PT FT PT Petroleum Geoscience MSc campus) MSc / PGDip / PGCert £4,600 - £5,430 - £12,000 - £4,520 - £23,400 - Petroleum Engineering MSc

Painter, Kevin

472

Boston University User Fee Structure for ICP-ES, ICP-MS and Laser Labs  

E-Print Network (OSTI)

Boston University User Fee Structure for ICP-ES, ICP-MS and Laser Labs The Department of Earth for digestions protocols include flux fusions, microwave digestions, and open vial digestions. Standardization come to BU and digest their samples in our labs with sufficient training. Laser-ICP-MS cost per sample

Hutyra, Lucy R.

473

Fee Name: Increase University Library Hours of Operation Measure #: Measure 42  

E-Print Network (OSTI)

a quiet, uninterrupted space for study. Greater access to the Library is a key component to the studentsFee Name: Increase University Library Hours of Operation Measure #: Measure 42 Ballot Information Shall the undergraduate and graduate students of UCSC provide funding for the University Library (Mc

California at Santa Cruz, University of

474

Fee-For-Service Contracts in the Pharmaceutical Industry (Extended Abstract)  

E-Print Network (OSTI)

Fee-For-Service Contracts in the Pharmaceutical Industry (Extended Abstract) Kathleen Martino and Yao Zhao Starting from 2005, the pharmaceutical industry has experienced a drastic change in the pricing contracts between manufacturers and distributors as the industry moved from the dominating Buy

Lin, Xiaodong

475

Costs for Academic Year 2013-2014 Tennessee Resident Tuition & Fees  

E-Print Network (OSTI)

Costs for Academic Year 2013-2014 Tennessee Resident Tuition & Fees New Undergraduate $11 Information Graduates of the BS curricula offered by the college may pursue advanced graduate study or take Industrial Engineering Materials Science & Engineering Mechanical Engineering Nuclear Engineering Master

Wang, Xiaorui "Ray"

476

User fees, health staff incentives, and service utilization in Kabarole District, Uganda  

E-Print Network (OSTI)

User fees, health staff incentives, and service utilization in Kabarole District, Uganda Walter in Kabarole District, western Uganda. Methods Of the 38 government health units that had introduced user incentive plans; Cost sharing; Community health centers/utilization; Health; Health care surveys; Uganda

Scharfstein, Daniel

477

Effects of increasing filing fees for noncompetitive onshore oil and gas leases  

SciTech Connect

The Government Accounting Office (GAO) examined the impact of increasing the fee charged to applicants for noncompetitive onshore oil and gas leases from $25.00 to $75.00. Interior believes the increased filing fee will: (1) reduce casual speculation and multiple filings, thereby reducing fraud potential, development delays caused by assignments, and administrative burden; and (2) generate significant additional revenue. Interior's analysis is, of necessity, based largely on conjecture, but the possibility that the positive results foreseen may not materialize to the degree projected cannot be ruled out. For example, while it is likely that the $75 fee will generate additional revenue over what was obtainable under either the $10 or $25 rate, Interior's projections of at least a million filings annually and $150 million in revenues are far from certain. GAO was also unable in the time available to determine the degree to which the problems the Department desires to overcome exist, or that they will be resolved through a fee increase. Results suggest that: reducing the number of filings is not necessarily the total or only solution to reducing the administrative burden; the casual speculator is not having that great an adverse effect on development, and in fact has certain positive aspects; and the true extent of fraud in the SOG may not be as great as initially supposed. In addition, there are possible adverse effects that may not have been fully considered. For example, the increased filing fee, when coupled with the increased rental, could adversely affect industry's exploration activities, particularly that of the smaller independent. GAO suggests, now that the increase is in effect, that the Interior Department and the Congress closely watch the results, and be prepared to take remedial action if deemed necessary.

Not Available

1982-03-19T23:59:59.000Z

478

EM Quality Assurance Assessment Schedule FY 2010  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DR. STFDlN L. KRAHN DR. STFDlN L. KRAHN DEPUTY ASSlS SAFETY ENVIRONhtENTAL MANAGEMENT SUBJECT: U p d a t e d F i Year 2010 Environmental Mmagemmt Quality Assurance Assessment Schedule AWhed for planuing and coordination purposes is t h e updated Ql&ty Amtrance {OA) asesmmt schedule for the remainder of fiscal year $Y) 2010. . - , The schedule is organized per the various types of QA asmmum@ that will k led by the Office of S t a n e and Quality Assurance (EM-23) or the Field elements. Please provide your feedbadc on the suggested self-atxwssment dates by Monday, Apd 12,2010 (item 2, below). Tht scope a n d tim'mg of plaoned asseasments are designed to be relevant, timely, and & I value to enhaace QA performame of specific projects. EM-23 has developed the attached oversight prioritization methodology plan that takes into

479

Rate Schedule CV-NWT5  

NLE Websites -- All DOE Office Websites (Extended Search)

NWT5 NWT5 (Supersedes Schedule CV-NWT4) UNITED STATES DEPARTMENT OF ENERGY WESTERN AREA POWER ADMINISTRATION CENTRAL VALLEY PROJECT SCHEDULE OF RATE FOR NETWORK INTEGRATION TRANSMISSION SERVICE Effective: October 1, 2011, through September 30, 2016. Available: Within the marketing area served by the Western Area Power Administration (Western), Sierra Nevada Customer Service Region. Applicable: To customers receiving Central Valley Project (CVP) Network Integration Transmission Service (NITS). Character and Conditions of Service: Transmission service for three-phase, alternating current at 60-hertz, delivered and metered at the voltages and points of delivery or receipt, adjusted for losses, and delivered to points of delivery. This service includes scheduling and system control and dispatch service needed to

480

WestSolarGroundMount City of Phoenix/ASU West  

E-Print Network (OSTI)

Fletcher WestSolarGroundMount Lawn Field City of Phoenix/ASU West South Fields Community Park Lecture Hall KIVA 3E Las Casas Residence Hall CASA 3C · Student Housing · Student Housing Sands Classroom for exact locations. N S W E Z Under Construction WC PTS CSC South Zone Park Zone South Zone South Zone

Note: This page contains sample records for the topic "fee schedule west" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Scheduling and allocation algorithm for an elliptic filter  

E-Print Network (OSTI)

A new evolutionary algorithm for scheduling and allocation algorithm is developed for an elliptic filter. The elliptic filter is scheduled and allocated in the proposed work which is then compared with the different scheduling algorithms like As Soon As Possible algorithm, As Late As Possible algorithm, Mobility Based Shift algorithm, FDLS, FDS and MOGS. In this paper execution time and resource utilization is calculated using different scheduling algorithm for an Elliptic Filter and reported that proposed Scheduling and Allocation increases the speed of operation by reducing the control step. The proposed work to analyse the magnitude, phase and noise responses for different scheduling algorithm in an elliptic filter.

Marikkannan, Sangeetha

2012-01-01T23:59:59.000Z

482

On dynamic scheduling of a parallel server system with certain graph structure  

E-Print Network (OSTI)

Primitives 2.3 Scheduling Control . Chapter 3 Sequence ofto be mutually independent. Scheduling Control The system isand service rates and scheduling control are allowed to vary

Pesic, Vladimir N.

2011-01-01T23:59:59.000Z

483

An Online Scheduling Algorithm with Advance Reservation for Large-Scale Data Transfers  

E-Print Network (OSTI)

Flow scheduling and endpoint rate control in gridnetworks.granularity and ?ner control in scheduling with a cost ofMukherjee. Control plane for advance bandwidth scheduling in

Balman, Mehmet

2012-01-01T23:59:59.000Z

484

Space-Time Power Scheduling of MIMO LinksFairness and QoS Considerations  

E-Print Network (OSTI)

design of link scheduling and power control. This would be aPower control, beamforming and link scheduling are alllink scheduling (temporal freedom) with MIMO power control (

Rong, Yue; Hua, Yingbo

2008-01-01T23:59:59.000Z

485

Energy Consumption Scheduling in Smart Grid: A Non-Cooperative Game Approach  

E-Print Network (OSTI)

on Game- Theoretic Energy Consumption Scheduling for theIn this paper, energy consumption scheduling based on non-Energy Consumption Scheduling in Smart Grid: A Non-

Ma, Kai; Hu, Guoqiang; Spanos, Costas J

2014-01-01T23:59:59.000Z

486

All degree seeking students enrolled in 4 or more credit hours during the fall and/or spring semester shall pay all mandatory student fees. Degree seeking students enrolled in Field Session or Summer Session shall pay the fees specified  

E-Print Network (OSTI)

and internet network access, dial-in-services, software licensing and service support, and appropriate access in the 2007-2008 year, the fee will be used to provide all CSM students with a RTD College Pass (good for all

487

Alternative Fuels Data Center: West Virginia Laws and Incentives  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

West Virginia Laws and West Virginia Laws and Incentives to someone by E-mail Share Alternative Fuels Data Center: West Virginia Laws and Incentives on Facebook Tweet about Alternative Fuels Data Center: West Virginia Laws and Incentives on Twitter Bookmark Alternative Fuels Data Center: West Virginia Laws and Incentives on Google Bookmark Alternative Fuels Data Center: West Virginia Laws and Incentives on Delicious Rank Alternative Fuels Data Center: West Virginia Laws and Incentives on Digg Find More places to share Alternative Fuels Data Center: West Virginia Laws and Incentives on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type West Virginia Laws and Incentives Listed below are incentives, laws, and regulations related to alternative

488

NETL: Science Bowl Information - West Virginia - Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

Overview Overview CLICK ON IMAGE TO SEE LARGER VIEW Morgantown High, winners of the 2012 West Virginia Regional Science Bowl. From left, Nima Ronaghi, Samet Demircan, Dev Someshwar, Shiv Sunil, Andrew Maloney, and Joe Melia (coach). The U.S. Department of Energy National Science Bowl® is a nationwide competition held annually to promote science and technology in education. High school students compete as teams in an action-packed quiz bowl format to answer questions on science, math, and engineering. The West Virginia Regional Science Bowl® is one of many regional competitions held for high school teams across the country to select participants for the National Science Bowl held in Washington D.C. West Virginia students have represented the state admirably at the national

489

Far West Rice | Open Energy Information  

Open Energy Info (EERE)

West Rice West Rice Jump to: navigation, search Name Far West Rice Place Nelson, California Zip 95958 Sector Solar Product California-based family-owned rice mill. Owns a solar farm used mostly for the electricity needs of their factory. Coordinates 44.422864°, -92.009187° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.422864,"lon":-92.009187,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

490

West Central School Corp | Open Energy Information  

Open Energy Info (EERE)

School Corp School Corp Jump to: navigation, search Name West Central School Corp Facility West Central School Corp Sector Wind energy Facility Type Community Wind Facility Status In Service Owner West Central School Corp Developer Performance Services Energy Purchaser Net-metered Location Francesville IN Coordinates 41.02886641°, -86.89028978° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.02886641,"lon":-86.89028978,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

491

NETL: West Virginia Science Bowl Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

West Virginia Science Bowl Archive West Virginia Science Bowl Archive More media can be found on the National Science Bowl Website 2013 WVSB winner Morgantown HS places 4th at National Science Bowl Congratulations to Morgantown High School, champions of the 2012 WV Regional Science Bowl! We've got two news releases. A preview of our new buzzer system and an interview with WV Regional Science Bowl Coordinator Steve Woodruff, who passed the reins to Kirk Gerdes for 2012. 2012 2012 WV Regional Science Bowl Pictures [ZIP-21MB] 2012 WV Regional Science Bowl Team Pictures [ZIP-42MB] Two news items about planning the 2012 competition. 2011 2011 West Virginia Regional Science Bowl Results Press Release 2011 WV Regional Science Bowl Pictures [ZIP-8MB] 2011 WV Regional Science Bowl Team Pictures [ZIP-8MB]

492

Crosswalk between DOERS and Admin Schedules  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/00 2/00 Cross-Walk -DOERS to Admin Sched rev2.wpd DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Item Number Description of Records DOE Administrative or Programmatic Schedule Number / Item NARA Case Number DOERS 1, Medical, Health and Safety Records DOERS 1, Item 1a Safety Management Records DOE Admin18, Item 11.1a, NC-326-75-2 DOERS 1, item 1 (b, c, d, & e) Safety Management Records DOE Admin 18, item 11.1 (c, d, e & f) II NNA-1023(2) II NNA-310(6) II NNA-1023(3) II NNA-409(25) DOERS 1, Item 2 Fire Unit Records DOE Admin18 ,Item 11.4 (a thru g) NC-430-76-2(3) II NNA-1858(1B) II NNA-2939 II NNA-1858(1C) II NNA-1858(E) II NNA-1858(1F) DOERS 1, Item 3 Medical or Health Research Project Case Files R & D Programmatic Schedule

493

Scheduling with Advanced Process Control Constraints  

E-Print Network (OSTI)

companies have to pay great attention to lower their produc- tion costs and guarantee high quality machine parameters so as to achieve satisfactory product quality. When there is a conflict between quality and scheduling ob- jectives, quality usually has to be satisfied. This paper studies the interaction between

Hasenbein, John

494

Hanford Treats Groundwater Ahead of Schedule  

Energy.gov (U.S. Department of Energy (DOE))

RICHLAND, Wash. EMs Richland Operations Office and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) are ahead of schedule in meeting EM's annual goals for treating contaminated groundwater at the Hanford site in southeast Washington state.

495

Energy Conscious Scheduling Johnatan E. Pecero  

E-Print Network (OSTI)

Energy Conscious Scheduling Johnatan E. Pecero University of Luxembourg January 18, 2012 Green Days of Luxembourg Friday, January 20, 2012 #12;Johnatan E. Pecero Green Approaches · Hardware approach ­ Energy, microsoft) 9 Friday, January 20, 2012 #12;Johnatan E. Pecero Green Approaches · Hardware approach ­ Energy

Lefèvre, Laurent

496

Advance Resource Provisioning in Bulk Data Scheduling  

SciTech Connect

Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

Balman, Mehmet

2012-10-01T23:59:59.000Z

497

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

498

CM-1-H Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule CM-1-H Wholesale Power Rate Schedule Area: MEAM, MDEA, and SMEPA System: CU This rate schedule shall be available to the South Mississippi Electric Power Association, Municipal Energy Agency of Mississippi, and Mississippi Delta Energy Agency. This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Document Available for Download CM-1-H Rate Schedule More Documents & Publications CEK-1-H Wholesale Power Rate Schedule CSI-1-H Wholesale Power Rate Schedule

499

Gain Scheduled Control Using the Dual Youla Parameterization  

E-Print Network (OSTI)

Stability is a critical issue in gain-scheduled control problems in that the closed loop system may not be stable during the transitions between operating conditions despite guarantees that the gain-scheduled controller stabilizes the plant model...

Chang, Young Joon

2011-08-08T23:59:59.000Z

500

Weapon Scheduling Method for Cooperative Air-Defense Operation  

Science Journals Connector (OSTI)

By defining the weapon scheduling plan and weapon combat action, the mathematical formulation of weapon scheduling problem for cooperative air-defense operation ... the basis of discussing the primary constraints...

Liang Yu; Changfeng Xing

2012-01-01T23:59:59.000Z