National Library of Energy BETA

Sample records for fee performance period

  1. Performance Period Total Fee Paid FY2008

    Office of Environmental Management (EM)

    FY2008 $87,580 FY2009 $87,580 FY2010 $171,763 FY2011 $1,339,286 FY 2012 $38,126 FY 2013 $42,265 Cumulative Fee Paid $1,766,600 $42,265 Cost Plus Incentive Fee/Cost Plus Fixed Fee $36,602,425 Contract Period: September 2007 - November 30, 2012 Target Fee $521,595 Total Estimated Contract Cost Contract Type: Maximum Fee $3,129,570 $175,160 $377,516 $1,439,287 Fee Available $175,160 $80,871 Accelerated Remediation Company (aRc) DE-AT30-07CC60013 Contractor: Contract Number: Minimum Fee $2,086,380

  2. Performance Period Total Fee Paid FY2001

    Office of Environmental Management (EM)

    FY2001 $4,547,400 FY2002 $4,871,000 FY2003 $6,177,902 FY2004 $8,743,007 FY2005 $13,134,189 FY2006 $7,489,704 FY2007 $9,090,924 FY2008 $10,045,072 FY2009 $12,504,247 FY2010 $17,590,414 FY2011 $17,558,710 FY2012 $14,528,770 Cumulative Fee Paid $126,281,339 Cost Plus Award Fee DE-AC29-01AL66444 Washington TRU Solutions LLC Contractor: Contract Number: Contract Type: $8,743,007 Contract Period: $1,813,482,000 Fee Information Maximum Fee $131,691,744 Total Estimated Contract Cost: $4,547,400

  3. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    Total Fee Paid FY2008 $134,832 FY2009 $142,578 FY2010 $299,878 FY2011 $169,878 Cumulative Fee Paid $747,166 Contract Period: September 2007 - October 2012 $31,885,815 C/P/E Environmental Services, LLC DE-AM09-05SR22405/DE-AT30-07CC60011/SL14 Contractor: Contract Number: Contract Type: Cost Plus Award Fee $357,223 $597,797 $894,699 EM Contractor Fee Site: Stanford Linear Accelerator Center (SLAC) Contract Name: SLAC Environmental Remediation December 2012 $1,516,646 Fee Available $208,620 Fee

  4. Total Estimated Contract Cost: Contract Option Period: Maximum Fee

    Office of Environmental Management (EM)

    Maximum Fee Performance Period Fee Earned FY2011/2012 $4,059,840 FY2013 $2,928,000 FY2014 $3,022,789 FY2015 FY2016 Cumulative Fee $10,010,629 $19,878,019 $3,214,544 $5,254,840 $5,662,028 $1,421,695 Fee Available $4,324,912 $417,833,183 Contract Base Period: January 3, 2011 - September 2, 2016 (Extended) Fee Information Minimum Fee $0 N/A $19,878,019 Contractor: Babcock & Wilcox Conversion Services, LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee EM Contractor Fee

  5. Award Fee Evaluation Period 6 Determination Scorecard Contractor: Wastren-EnergX Mission Support, LLC

    Office of Environmental Management (EM)

    6 Determination Scorecard Contractor: Wastren-EnergX Mission Support, LLC Contract: DE-CI0000004 Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Basis of Evaluation: Award Fee Plan for Wastren-EnergX Mission Support, LLC Award Fee Evaluation Period 6 Categories of Performance: $1,435,629 Award Fee Available: $1,435,629 Award Fee Earned: $1,406,916 (98%) Categories of Performance Award Fee Award Fee Area Adjectival Ratings Award Fee Available: $1,435,629 1.

  6. Award Fee Evaluation Period 5 Determination Scorecard Contractor: Fluor-BWXT Portsmouth LLC

    Office of Environmental Management (EM)

    5 Determination Scorecard Contractor: Fluor-BWXT Portsmouth LLC Contract: DE-AC30-10CC40017 Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Basis of Evaluation: Award Fee Plan for Fluor-BWXT Portsmouth, LLC Award Fee Evaluation Period 5 Categories of Performance: Subjective: $4,280,759 PBI: $9,988,437 Stretch: $0 Award Fee Available: $14,269,196 Award Fee Earned: $10,503,998 (73.6%) Categories of Performance Award Fee Award Fee Area Adjectival Ratings Base

  7. Total Estimated Contract Cost: Performance Period

    Office of Environmental Management (EM)

    FY2012 Fee Information Minimum Fee Maximum Fee September 2015 Contract Number: Cost Plus Incentive Fee Contractor: 3,264,909,094 Contract Period: EM Contractor Fee s Idaho...

  8. Fiscal year 1999 Battelle performance evaluation and fee agreement

    SciTech Connect (OSTI)

    DAVIS, T.L.

    1998-10-22

    Fiscal Year 1999 represents the third fill year utilizing a results-oriented, performance-based evaluation for the Contractor's operations and management of the DOE Pacific Northwest National Laboratory (here after referred to as the Laboratory). However, this is the first year that the Contractor's fee is totally performance-based utilizing the same Critical Outcomes. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractor's performance for the period October 1, 1998 through September 30, 1999, as required by Clauses entitled ''Use of Objective Standards of Performance, Self Assessment and Performance Evaluation'' and ''Performance Measures Review'' of the Contract DE-ACO6-76RL01830. Furthermore, it documents the distribution of the total available performance-based fee and the methodology set for determining the amount of fee earned by the Contractor as stipulated within the causes entitled ''Estimated Cost and Annual Fee,'' ''Total Available Fee'' and ''Allowable Costs and Fee.'' In partnership with the Contractor and other key customers, the Department of Energy (DOE) Headquarters (HQ) and Richland Operations Office (RL) has defined four critical outcomes that serve as the core for the Contractor's performance-based evaluation and fee determination. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory.

  9. Award Fee Determination Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 CH2M Hill Plateau Remediation Company Contract Number: DE-AC06-08RL14788 Final Fee Determination for Base funded Performance Measures Basis of Evaluation: Completion of Performance Measures contained in Section J, Attachment J.4, Performance Evaluation and Measurement Plan, according to the identified completion criteria. Evaluation Results: FY 2012 Base Period Fee Available Fee allocated to FY 2012* Performance Measures $10,399,033.60 Incremental Fee $4,490,000.00 Provisional Fee

  10. PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 - March 2013 Page 1 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP) 1 OCTOBER 2012 through 30 SEPTEMBER 2013 Contract No. DE- EM-0001971 I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) provides a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract. Fee determinations are not subject to the Disputes Clause of the contract. II.

  11. Fees

    Office of Energy Efficiency and Renewable Energy (EERE)

    The DOE Loan Program is required to collect several fees from loan program Applicants. Please find an outline of these fees below. In addition, DOE is supported by outside consultants and legal...

  12. Total Estimated Contract Cost: Performance Period

    Office of Environmental Management (EM)

    Fee Available (N/A) Total Fee Paid $23,179,000 $18,632,000 $16,680,000 $18,705,000 $25,495,000 $34,370,000 $32,329,000 $33,913,000 $66,794,000 $10,557,000 $3,135,000 $283,789,000 FY2015 FY2014 FY2013 FY2009 FY2010 FY2011 FY2012 Fee Information Minimum Fee Maximum Fee Dec 2015 Contract Number: Cost Plus Incentive Fee Contractor: $3,264,909,094 Contract Period: EM Contractor Fee s Idaho Operations Office - Idaho Falls, ID Contract Name: Idaho Cleanup Project $0 Contract Type: CH2M Washington Group

  13. Microsoft Word - FY14 NWP Fee Scorecards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY14 Fee Determination Scorecard Contractor: Nuclear Waste Partnership, LLC Contract: DE-EM0001971 Award Period: October 1, 2013 through September 30, 2014 Basis of Evaluation: Performance and Evaluation Plan (PEMP) for FY2014 The FY2014 PEMP for this contract is available at: http://www.wipp.energy.gov/NWPpayments/NWP.htm Award Fee Scorecard: Subjective Fee (Award Fee) Criteria Summary Table Criteria Maximum Available Fee Adjectival Rating Fee Range Available for Adjectival Ratings Percentage

  14. fees

    Broader source: Energy.gov (indexed) [DOE]

    PRIME CONTRACTOR FEES ON SUBCONTRACTOR COSTS U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES AUDIT REPORT DOE/IG-0427 SEPTEMBER 1998 September 11, 1998 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Acting Inspector General SUBJECT: INFORMATION : Audit Report on "The U.S. Department of Energy's Prime Contractor Fees on Subcontractor Costs" BACKGROUND In Fiscal Year 1996, the Department's prime contractors awarded $5.3 billion in subcontracts. The

  15. Total Estimated Contract Cost: Contract Option Period: Performance

    Office of Environmental Management (EM)

    Performance Period Fee Earned FY2000 thru 2008 $102,622,325 FY2009 $12,259,719 FY2010 $35,789,418 FY2011 $24,126,240 FY2012 $24,995,209 FY2013 $6,340,762 FY2014 $16,285,867 FY2015 $35,931,000 $8,595,000 FY2016 $25,181,000 FY2017 $24,849,000 FY2018 $99,100,000 FY2019 $129,700,000 Cumulative Fee $231,014,540 $599,588,540 $12,259,719 $35,789,418 $38,554,240 $41,785,209 $16,698,762 $37,117,867 Maximum Fee $599,588,540 Fee Available $102,622,325 $10,868,785,789 Completion Contract: December 11, 2000

  16. Award Fee Determination Scorecard Contractor: Savannah River Remediation, LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remediation, LLC Contract: Cost Plus Award Fee (CPAF) Contract Number: DE-AC09-09SR22505 Award Period: October 1, 2013 - September 30, 2014 Basis of Evaluation: Performance and Evaluation Plan (PEMP) Award Fee: $3,000,000.00 Incentive Fee: $22,500,000.00 Forfeiture of Fee: ($27,092.00) Total Fee Available: $28,500,000.00 Total Fee Earned: $26,825,795.00 Percentage Fee Earned: 95% This is a Cost Plus Award Fee contract as defined by Federal Acquisition Regulations (FAR). Fee is made available for

  17. FY 14 Award Fee Determination Scorecard

    Office of Environmental Management (EM)

    14 Award Fee Determination Scorecard Contractor: Swift and Staley Inc. (SST) Contract: DE-AC30-10CC40021 Award Period: October 1,2013 - September 30,2014 Basis of Evaluation: FY 14 Award Fee Plan Categories of Performance: $2,415,920 Award Fee Earned $2,295,124 95% Award Fee earned Categories of Performance Award Fee Award Fee Adjectival Ratings: Quality and Effectiveness of Security Quality and Effective Support to DOE Quality and Effective Site Infrastructure Services Cost Savings Initiative

  18. Richland Operations Office's Fiscal Year 2014 Fee Evaluation Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Office's Fiscal Year 2014 Fee Evaluation Summary Contractor: CH2M HILL Plateau Remediation Company (CHPRC) Contract: Plateau Remediation Contract Contract Number: DE-AC06-08RL14788 Award Period: October 2013 through September 2014 (fiscal year 2014) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $9,815,000 Award Fee Earned: $9,659,555 Award Fee Area Adjectival Ratings: Excellent (Earnings represent 98 percent of available fee) Significant

  19. Richland Operations Office's Fiscal Year 2013 Fee Evaluation Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Office's Fiscal Year 2013 Fee Evaluation Summary Contractor: CH2M HILL Plateau Remediation Company (CHPRC) Contract: Plateau Remediation Contract Contract Number: DE-AC06-08RL14788 Award Period: October 2012 through September 2013 (fiscal year 2013) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $14,092,235 (includes fee set aside for multi-year incentives for the Plutonium Finishing Plant project) Award Fee Earned: $4,910,099 Award Fee

  20. Microsoft Word - Award Fee Determination Scorecard for FY 2013 (4)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract: Tank Operations Contract Contract Number: DE-AC27-08RV14800 Award Fee Period: October 1, 2012 to September 30, 2013 Basis of Evaluation: FY 2013 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available: $7,994,699 Award Fee Earned: $6,483,701 (81.1%) Award Fee Area Adjectival Ratings: Functional Element Adjectival Rating* Conduct of Operations Very Good General Management Very Good -Contract Administration and Compliance Good - Business Systems Management Good -

  1. Award Fee Determination Scorecard Contractor: Savannah River Remediation, LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remediation, LLC Contract: Cost Plus Award Fee (CPAF) Contract Number: DE-AC09-09SR22505 Award Period: October 1, 2012 - September 30, 2013 Basis of Evaluation: Performance and Evaluation Plan (PEMP) Award Fee: $3,370,000 Incentive Fee: $28,000,000 Total Fee Available: $31,370.000 Total Fee Earned: $29,742,886 Percentage Earned: 95% This is a Cost Plus Award Fee contract as defined by Federal Acquisition Regulations (FAR). Fee is made available for the completion of explicit work results, such

  2. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment & Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: January 1, 2014 to June 30, 2014 Basis of Evaluation: 2014-A Performance Evaluation and Measurement Plan Award Fee Available: $6,300,000 Award Fee Earned: $3,970,000 (63.0%) Incentive B.1 - Award Fee-Project Management The fee for Project Management is divided into three Award Fee Objectives

  3. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment & Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: July 1, 2014 to December 31, 2014 Basis of Evaluation: 2014-B Performance Evaluation and Measurement Plan Award Fee Available: $6,300,000 Award Fee Earned: $4,095,000 (65.0%) Incentive B.1 - Award Fee-Project Management - Good The fee for Project Management

  4. Award Fee Determination Scorecard Contractor: Washington River Protection Solutions, LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract: Tank Operations Contract Contract Number: DE-AC27-08RV14800 Award Fee Period: October 1, 2013 to September 30, 2014 Basis of Evaluation: FY 2014 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available: $12,597,052 Award Fee Earned: $10,459,418 (83.0%) Award Fee Area Adjectival Ratings for each Award Fee Special Emphasis Area (SEA): Functional Element Adjectival Rating* SEA 1: Management of Single-Shell (SST) and Double-Shell Tank (DST) System Excellent SEA 2:

  5. Award Fee Determination Scorecard Contractor: Washington River Protection Solutions, LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Washington River Protection Solutions, LLC Contract: Tank Operations Contract Contract Number: DE-AC27-08RV14800 Award Fee Period: October 1, 2014 to September 30, 2015 Basis of Evaluation: FY 2015 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available: $15,600,000 Award Fee Earned: $13,728,000 (88%) Award Fee Area Adjectival Ratings for each Award Fee Special Emphasis Area (SEA): Functional Element Adjectival Rating* SEA 1: Management of Single-Shell (SST) and Double-Shell

  6. Microsoft Word - DRAFT FY15 Award Fee Plan LATA - 09-19-2014 clean

    Office of Environmental Management (EM)

    Remediation Contract Award Fee Plan Contract Number: DE-AC30-10CC40020 AWARD FEE PLAN FOR LATA Environmental Services of Kentucky, LLC DE-AC30-10CC40020 TABLE OF CONTENTS PAGE 1. INTRODUCTION 1 2. DEFINITION OF TERMS 1 3. AWARD FEE STRUCTURE 1 4. ORGANIZATIONAL STRUCTURE 2 5. RESPONSIBILITIES 3 6. AWARD FEE AMOUNTS AND PERIODS 3 7. AWARD FEE PROCESS 4 8. TERMINATION FOR CONVENIENCE 7 EXHIBITS 1. Performance Evaluation Board (PEB) Members and Advisors 8 2. Award Fee Rating Table, Award Fee

  7. Award Fee Determination Scorecard Contractor: Savannah River Nuclear Solutions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Solutions Contract: Management and Operations Contract Number: DE-AC09-08SR22470 Award Period: October 1, 2013 - September 30, 2014 Basis of Evaluation: Performance and Evaluation Plan (PEMP) This is a Cost Plus Award Fee contract as defined by federal acquisition regulations (FAR). Fee is made available for the completion of explicit work results, such as completing a task on time, or for implicit performance in areas of cost, schedule/timeliness, quality and business relations. Fee may

  8. EM Reviews Portsmouth, Paducah Site Contractor Performance, Determines Award Fees

    Broader source: Energy.gov [DOE]

    LEXINGTON, Ky. – EM has completed annual performance evaluations of four prime contractors working on the deactivation, decontamination, and decommissioning of the former gaseous diffusion plants near Portsmouth, Ohio and Paducah, Kentucky.

  9. Total Estimated Contract Cost: Contract Option Period: Performance

    Office of Environmental Management (EM)

    Contractor: Bechtel National Inc. Contract Number: DE-AC27-01RV14136 Contract Type: Cost Plus Award Fee NA Maximum Fee 599,588,540 Fee Available 102,622,325 10,868,785,789...

  10. Contractor Fee Payments- Small Sites

    Broader source: Energy.gov [DOE]

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Small Sites office on these charts.

  11. Microsoft Word - BWCS Scorecard Third period FY 2014 Mar 9 2015 revised (FINAL)

    Office of Environmental Management (EM)

    FY 14 Award Fee Determination Scorecard Contractor: B&W Conversion Services, LLC Contract: DE-AC30-11CC40015 Award Period: October 1, 2013 - September 30, 2014 Basis of Evaluation Performance and Evaluation Plan (PEMP)/Award Fee Plan for Award Period Award Fee Available: $2,095,635 Award Fee Earned: $1,508,857 Categories of Performance Award Fee Award Fee Area Adjectival Ratings: Quality and Effectiveness of Environment, Safety, Health, and Quality Assurance: Good Quality and Effectiveness

  12. Award Fee Determination Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 CH2M Hill Plateau Remediation Company Contract Number: DE-AC06-08RL14788 Final Fee Determination for Base funded and American Recovery and Reinvestment Act (Recovery) funded Performance Measures Basis of Evaluation: Completion of Performance Measures contained in Section J, AttachmentJ.4, Performance Evaluation and Measurement Plan, according to the identified completion criteria. Evaluation Results: Fiscal Year 2011 (Oct 1, 2010 - Sept 30, 2011) Base Funded Fee Recovery Funded Fee Available

  13. FOIA FEES

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fees The FOIA generally requires that requestors pay fees for processing their requests. If costs associated with the processing of a FOIA request are $15.00 or less, no fees are charged. Each FOIA request is reviewed for the purpose of placing a requestor in one of four fee categories described below: 1. Commercial use requestor: Responsible for all direct costs; i.e. search for responsive documents, review of documents located for responsiveness; 16% administrative costs; reproduction cost of

  14. Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for

    Office of Environmental Management (EM)

    April to September 2015 | Department of Energy DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015 Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015 DOE's Oak Ridge Environmental Management Office told URS | CH2M Oak Ridge LLC (UCOR) in a letter that it had completed its evaluation of the company's performance for the award fee period of April to September 2015 and determined that UCOR earned a fee of more

  15. Contractor Fee Payments- Idaho Operations Office

    Broader source: Energy.gov [DOE]

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Idaho Operations Office on these charts.

  16. Contractor Fee Payments- Carlsbad Field Office

    Broader source: Energy.gov [DOE]

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Carlsbad Field Office on these charts.

  17. Extension of Comment Period on Improving Performance of Federal Permitting

    Energy Savers [EERE]

    and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 | Department of Energy Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 On August 29,

  18. Extension of Comment Period on Improving Performance of Federal Permitting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 | Department of Energy Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 On August 29,

  19. Contractor Fee Payments - Savannah River Operations Office | Department of

    Energy Savers [EERE]

    Energy Contractor Fee Payments - Savannah River Operations Office Contractor Fee Payments - Savannah River Operations Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts. PDF icon Liquid Waste Processing PDF icon Site Management and Operations PDF icon Comprehensive Security Services PDF icon Salt Waste Processing Facility More Documents & Publications Contractor Fee

  20. Contractor Fee Payments - Oak Ridge Operations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Oak Ridge Operations Contractor Fee Payments - Oak Ridge Operations See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Oak Ridge Operations on these charts. PDF icon East Tennessee Technology Park PDF icon Transuranic Waste Processing - Wastren More Documents & Publications Major Contracts Summary Contractor Fee Payments - Savannah River Operations Office Contractor Fee Payments - Portsmouth Paducah Projec

  1. Contractor Fee Payments - Office of River Protection | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of River Protection Contractor Fee Payments - Office of River Protection See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Office of River Protection on these charts. PDF icon Laboratory Analytical Services & Testing PDF icon Tank Operations PDF icon Waste Treatment Plant Design & Construction More Documents & Publications Contractor Fee Payments - Savannah River Operations Office Contractor Fee Payments -

  2. The research performed during the last granting period involved trasnscriptomic

    Office of Scientific and Technical Information (OSTI)

    research performed during the last granting period involved trasnscriptomic analysis of extracellular proteins expressed by wood-degrading fungi. Here we studied both the brown rot fungus Postia placenta and white rot fungus Phanerochaete chrysosporium. Our most recent efforts have been on the brown rot fungus. We have grown these fungi on their woody substrates and isolated the mRNA for 454 sequencing. We recognized that this approach could potentially lead to discovery of new enzymes involved

  3. Contractor Fee Payments - Savannah River Site Office | Department...

    Broader source: Energy.gov (indexed) [DOE]

    the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts. Liquid Waste...

  4. Award Fee Determination Scorecard Contractor: Savannah River Nuclear Solutions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 - September 30, 2013 Basis of Evaluation: Performance and Evaluation Plan (PEMP) This is a Cost Plus Award Fee contract as defined by federal acquisition regulations (FAR). Fee is made available for the completion of explicit work results, such as completing a task on time, or for implicit performance in areas of cost, schedule/timeliness, quality and business relations. Fee may be earned based on an annual evaluation of contract performance. Total available fee for each contract year is

  5. Award Fee Determination Scorecard Contractor: Savannah River Nuclear Solutions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 - September 30, 2015 Basis of Evaluation: Performance and Evaluation Plan (PEMP) This is a Cost Plus Award Fee contract as defined by federal acquisition regulations (FAR). Fee is made available for the completion of explicit work results, such as completing a task on time, or for implicit performance in areas of cost, schedule/timeliness, quality and business relations. Fee may be earned based on an annual evaluation of contract performance. Total available fee for each contract year is

  6. Contractor Fee Payments - Richland Operations Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office Contractor Fee Payments - Richland Operations Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Richland Operations Office on these charts. PDF icon Occupational Medical Services - HPM Corporation PDF icon Infrastructure and Site Services Support PDF icon Plateau Remediation PDF icon River Corridor Closure PDF icon Occupational Health Services More Documents & Publications Contractor Fee

  7. Incentive Fee Determination Summary Contractor: Washington Closure Hanford LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Incentive Fee Determination Summary Contractor: Washington Closure Hanford LLC Contract: River Corridor Closure Contract Line Item Number One (CLIN 1) Schedule Performance Incentive Fee (SPIF) Contract Number: DE-AC06-05RL14655 Award Fee Available: $32,800,000 Award Fee Earned: $31,200,000 Basis of Evaluation: Completion of CLIN 1 incentivized scope identified in Section J, Attachment J-1, River Corridor Closure Contract Work Scope, according to the schedule set forth in Section B, Table B.1

  8. Policy Flash 2013-41 Contracts Periods of Performance Exceeding 5 Years |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1 Contracts Periods of Performance Exceeding 5 Years Policy Flash 2013-41 Contracts Periods of Performance Exceeding 5 Years Attached is Policy Flash 2013-41 Contracts Periods of Performance Exceeding 5 Years Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe.gov. PDF icon Policy

  9. Contractor Fee Payments - Portsmouth Paducah Project Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Portsmouth Paducah Project Office Contractor Fee Payments - Portsmouth Paducah Project Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Portsmouth Paducah Project Office on these charts. PDF icon Paducah Remediation - LATA of Kentucky PDF icon Paducah Infrastructure Support PDF icon Portsmouth D&D PDF icon Operation of DUF6 PDF icon Portsmouth Facility Support Services PDF icon Paducah Deactivation

  10. AWARD FEE DETERMINATION SCORECARD Contractor: Restoration Services...

    Office of Environmental Management (EM)

    Basis of Evaluation: FY14 Award Fee Plan for Restoration Services, Inc.; Portsmouth Environmental Technical Services II Award Fee Available: 349,708.00 Award Fee Earned:...

  11. Fees | Open Energy Information

    Open Energy Info (EERE)

    stub. You can help OpenEI by expanding it. Retrieved from "http:en.openei.orgwindex.php?titleFees&oldid542709" Feedback Contact needs updating Image needs updating...

  12. ," Excise"," LUST Fee ",," ...

    U.S. Energy Information Administration (EIA) Indexed Site

    ...8,0.004,0.184,0.368,,0.18,0.004,0.184,0.428,,"Seawall Tax: 0.03gal (gasoline only) in effect in Harrison, Hancock, and Jackson Counties. Environmental Protection Fee: 0.004gal. ...

  13. FOIA FEES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEES FOIA FEES The FOIA generally requires that requestors pay fees for processing their requests. If costs associated with the processing of a FOIA request are $15.00 or less, no fees are charged. Each FOIA request is reviewed for the purpose of placing a requestor in one of the fee categories described in the document below. PDF icon FOIA FEES More Documents & Publications How to Make a FOIA Request FIA-11-0018 - In the Matter of Robert M. Balick FIA-11-0018 - In the Matter of Robert M.

  14. Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site, IG-0377

    Office of Environmental Management (EM)

    IG-1 INFORMATION: Report on "Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site" The Secretary BACKGROUND: During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five

  15. Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2014 - September 30, 2015 Basis of Evaluation: Award Fee Plan The contractor is required to provide, operate and maintain an armed and uniformed protective force for the physical protection of United States Department of Energy (DOE) security interests and other such related duties at the Savannah River Site (SRS). The

  16. EM Contractor Fee Payments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contractor Fee Payments EM Contractor Fee Payments In the interest of furthering transparency in its government operations, the Department of Energy's Office of Environmental Management (EM) herein is releasing information relating to fee payments under its major cost-reimbursable contracts. Charts delineating fees that are paid under cost-plus-award-fee (CPAF), cost-plus-incentive-fee (CPIF), and cost-plus-fixed-fee (CPFF) contracts are listed by site location in the following hyperlinks. With

  17. FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor: LATA Environmental Services of Kentucky, LLC

    Office of Environmental Management (EM)

    FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor: LATA Environmental Services of Kentucky, LLC Contract No.: DE-AC30-10CC40020 Award Period: October 1, 2013 through September 30, 2014 (FY14) Basis of Evaluation: Fy14 Award Fee Plan for LATA Environmental Services of Kentucky LLC Award Fee Area Adjectival Ratings: Quality and Effectiveness of Documents and Associated Support: Very Good Quality and Effective of ESH&QA: Very Good Quality and Effective of Project Support: Excellent

  18. Microsoft Word - FPDP Award Fee Plan 2015-2016 Rev 4 (Final) (2)

    Office of Environmental Management (EM)

    CONCUR: Reinhard Knerr AWARD FEE PLAN for Fluor Federal Services, Inc. Paducah Deactivation Task Order Number DE-DT0007774 Interim Award Fee Evaluation Period August 1, 2015 to July 31, 2016 Date hjfj;) Paducah Deactivation Technical Lead Portsmouth/Paducah Project Office Date o/f!s- * ortsmouth/Paducah Project Office APPROVED: Date: ~ Manager Portsmouth/Paducah Project Office Paducah Gaseous Diffusion Plant Deactivation Task Order No. DE-DT0007774 Attachment J-11 - Award Fee Plan Page 2 of 26

  19. CHPRC Fee Determination Summaries - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CHPRC Fee Determination Summaries DOE-RL Contracts/Procurements RL Contracts & Procurements Home Prime Contracts Current Solicitations Other Sources DOE RL Contracting Officers DOE RL Contracting Officer Representatives CHPRC Fee Determination Summaries Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size CHPRC Fiscal Year 2014 Fee Evaluation Summary CHPRC Fiscal Year 2013 Fee Evaluation Summary CHPRC Fiscal Year 2012 Fee Determination Summary Fiscal Year 2011 Fee

  20. Revenue From Contractor Fees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revenue From Contractor Fees Revenue From Contractor Fees Better Buildings Neighborhood Program Sustainability Peer Exchange Call: Revenue from Contractor Fees, call slides and discussion summary, November 1, 2012. PDF icon Call Slides and Discussion Summary More Documents & Publications Regional Networks for Energy Efficiency Key Opportunities and Challenges for Program Sustainability Assessing Revenue Streams: What Is Right for Your Program?

  1. USING AN ADAPTER TO PERFORM THE CHALFANT-STYLE CONTAINMENT VESSEL PERIODIC MAINTENANCE LEAK RATE TEST

    SciTech Connect (OSTI)

    Loftin, B.; Abramczyk, G.; Trapp, D.

    2011-06-03

    Recently the Packaging Technology and Pressurized Systems (PT&PS) organization at the Savannah River National Laboratory was asked to develop an adapter for performing the leak-rate test of a Chalfant-style containment vessel. The PT&PS organization collaborated with designers at the Department of Energy's Pantex Plant to develop the adapter currently in use for performing the leak-rate testing on the containment vessels. This paper will give the history of leak-rate testing of the Chalfant-style containment vessels, discuss the design concept for the adapter, give an overview of the design, and will present results of the testing done using the adapter.

  2. Award Fee Determination Scorecard Contractor: G4S Government Solutions, Inc. - Wackenhut Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: G4S Government Solutions, Inc. - Wackenhut Services Incorporated (WSI) Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2013 - September 30, 2014 Basis of Evaluation: Award Fee Plan The contractor is required to provide, operate, and maintain an armed and uniformed protective force for the physical protection of U.S. Department of Energy (DOE) security interests and other such related duties at

  3. NWP Fee Payments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contracts Payment Information Nuclear Waste Partnership, LLC (NWP) 2016 Performance Evaluation & Measurement Plan (PEMP) 2015 Performance Evaluation & Measurement Plan (PEMP)...

  4. H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to Perform Work on State...

  5. Brighter than a Hundred Suns: Solar Power for the Southwest. Period of Performance: November 20, 2001 to October 31, 2002

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    * NREL/SR-550-33233 A. Leitner and B. Owens Platts Research and Consulting Boulder, Colorado Brighter than a Hundred Suns: Solar Power for the Southwest Period of Performance: November 20, 2001 to October 31, 2002 National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute * Battelle * Bechtel Contract No. DE-AC36-99-GO10337 Arnold Leitner and Brandon Owens Platts Research and

  6. Title 43 CFR 3000.12 What is the Fee Schedule for Fixed Fees...

    Open Energy Info (EERE)

    000.12 What is the Fee Schedule for Fixed Fees? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  7. Department of Environmental Conservation Stormwater Program Fee...

    Open Energy Info (EERE)

    PermittingRegulatory Guidance - Supplemental Material: Department of Environmental Conservation Stormwater Program Fee SummaryPermittingRegulatory GuidanceSupplemental Material...

  8. Federal Court Dismisses Waste Fee Challenges | Department of Energy

    Office of Environmental Management (EM)

    Federal Court Dismisses Waste Fee Challenges Federal Court Dismisses Waste Fee Challenges December 13, 2010 - 2:31pm Addthis The D.C. Circuit today dismissed petitions filed by the National Association of Regulatory Utility Commissioners (NARUC) and other entities seeking (1) to force the Department to issue an assessment of the adequacy of the nuclear waste fund fee and (2) compelling suspension of the fee. These petitions were filed before the Department's recent issuance of a new fee

  9. Alternative Fuels Data Center: State Fees as Transportation Funding

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Alternatives Fees as Transportation Funding Alternatives to someone by E-mail Share Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Facebook Tweet about Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Twitter Bookmark Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Google Bookmark Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Delicious Rank

  10. Sacramento Ordinance to Waive Solar PV Fees

    Broader source: Energy.gov [DOE]

    This is an ordinance by the city of Sacramento to suspend for the calendar years 2007-2009 all fees related to installation of photovoltaic systems on existing residences.

  11. CONCUR: AWARD FEE PLAN - FY15

    Office of Environmental Management (EM)

    as Facility Support Services Contract Award Fee Plan Contract Number DE-CI0000004 3 editorial or personnel changes may be made and implemented without being provided to the...

  12. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Cost (Price of base): Contract Base Period: Contract Option Period: Minimum Fee Maximum Fee (Base Only) Performance Period Fee Available Fee Earned FY2012 15,763,807 15,087,078...

  13. Title 18 CFR 381 Fees | Open Energy Information

    Open Energy Info (EERE)

    Regulation: Title 18 CFR 381 FeesLegal Abstract Part 381 Fees, Forms under Title 18: Conservation of Power and Water Resources of the U.S. Code of Federal Regulations, current...

  14. Alaska Division of Water Permit Fees | Open Energy Information

    Open Energy Info (EERE)

    Water Permit Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Alaska Division of Water Permit Fees Author Alaska Division of Water Published...

  15. Utah Water Rights Fee Schedule | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah Water Rights Fee Schedule Abstract Water rights fee schedule based on amount appropriated....

  16. Title 11 Alaska Administrative Code Chapter 5 Fees | Open Energy...

    Open Energy Info (EERE)

    5 Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 11 Alaska Administrative Code Chapter 5 FeesLegal Abstract...

  17. UCOR Contract & Fee Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    UCOR Contract & Fee Determination UCOR Contract & Fee Determination The attached document is UCOR's conformed contract with the Oak Ridge Office of Environmental Managment. It is contract DE-SC0004645, and it includes all sections through MOD94. PDF icon UCOR contract (DE-SC0004645) PDF icon UCOR Fee Determination Letter (July 2014) More Documents & Publications PPPO Contract Awards Contractor Fee Payments - Oak Ridge Operations Policy Flash 2014-37 Update to the Department of Energy

  18. Contractor: Restoration Services, Inc. Contract: DE-EM0002639

    Office of Environmental Management (EM)

    Restoration Services, Inc. Contract: DE-EM0002639 Award Fee Evaluation Period 2 Determination Scorecard Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Basis of Evaluation: Award Fee Plan for Restoration Services Inc., Award Fee Evaluation Period 2 Categories of Performance: $392,092 Award Fee Available: $392,092 Award Fee Earned: $360,724.64 (92%) Categories of Performance Award Fee Award Fee Area Adjectival Ratings Award Fee Available: $392,092 1. Quality

  19. FY 2007 Fee Adequacy, Pub 2008 | Department of Energy

    Office of Environmental Management (EM)

    FY 2007 Fee Adequacy, Pub 2008 FY 2007 Fee Adequacy, Pub 2008 The purpose of this U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of the adequacy of the fee being paid by nuclear power utilities for the permanent disposal of their spent nuclear fuel by the Government. In accordance with the Nuclear Waste Policy Act of 1982 (the Act), the costs for disposal of commercial spent nuclear fuel are to be funded by a fee

  20. Top Performers Summer Fun

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Top Performers Summer Fun NSTec honors outstanding achievements. NNSA recognizes two of NFO's best. NSTEA offers hot vacation discounts. See pages 4-5. See page 3. Mitigation Fees Bring Opportunities for Tortoise Research Nevada National Security Site (NNSS) biologists have found a way to promote species research while keeping site-generated fees closer to home, thanks to a new agreement with the U.S. Fish and Wildlife Service (USFWS). In keeping with conservation laws, the USFWS charges NNSS

  1. Chapter 17: Residential Behavior Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures; Period of Performance September 2011 … December 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    17: Residential Behavior Protocol The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures Created as part of subcontract with period of performance September 2011 - December 2014 James Stewart The Cadmus Group Waltham, Massachusetts Annika Todd Lawrence Berkeley National Laboratory Berkeley, California NREL Technical Monitor: Charles Kurnik Subcontract Report NREL/SR-7A40-62497 January 2015 NREL is a national laboratory of the U.S. Department of

  2. Chapter 20: Data Center IT Efficiency Measures. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures; Period of Performance: September 2011 … December 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Data Center IT Efficiency Measures The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures Created as part of subcontract with period of performance September 2011 - December 2014 Robert Huang The Cadmus Group, Inc. Waltham, Massachusetts Eric Masanet Northwestern University Evanston, Illinois NREL Technical Monitor: Charles Kurnik Subcontract Report NREL/SR-7A40-63181 January 2015 NREL is a national laboratory of the U.S. Department of Energy

  3. Enumeration of Juvenile Salmonids in the Okanogan Basin Using Rotary Screw Traps, Performance Period: March 15, 2006 - July 15, 2006.

    SciTech Connect (OSTI)

    Johnson, Peter N.; Rayton, Michael D.

    2007-05-01

    The Colville Tribes identified the need for collecting baseline census data on the timing and abundance of juvenile salmonids in the Okanogan River basin for the purpose of documenting local fish populations, augmenting existing fishery data and assessing natural production trends of salmonids. This report documents and assesses the pilot year of rotary trap capture of salmonid smolts on the Okanogan River. The project is a component of the Colville Tribes Okanogan Basin Monitoring and Evaluation Program (OBMEP) which began in 2004. Trapping for outmigrating fish began on 14 March 2006 and continued through 11 July 2006. Anadromous forms of Oncorhynchus, including summer steelhead (O. mykiss), Chinook (O. tshawytscha), and sockeye (O. nerka), were targeted for this study; all have verified, natural production in the Okanogan basin. Both 8-ft and 5-ft rotary screw traps were deployed on the Okanogan River from the Highway 20 Bridge and typically fished during evening hours or 24 hours per day, depending upon trap position and discharge conditions. Juvenile Chinook salmon were the most abundant species trapped in 2006 (10,682 fry and 2,024 smolts), followed by sockeye (205 parr and 3,291 smolts) and steelhead (1 fry and 333 smolts). Of the trapped Chinook, all fry were wild origin and all but five of the smolts were hatchery-reared. All trapped sockeye were wild origin and 88% of the steelhead smolts were hatchery-reared. Mark-recapture experiments were conducted using Chinook fry and hatchery-reared steelhead smolts (sockeye were not used in 2006 because the peak of the juvenile migration occurred prior to the onset of the mark-recapture experiments). A total of 930 chinook fry were marked and released across eight separate release dates (numbers of marked Chinook fry released per day ranged from 34 to 290 fish). A total of 11 chinook fry were recaptured for an overall trap efficiency of 1.18%. A total of 710 hatchery-reared steelhead were marked and released across three separate release dates (numbers of steelhead released per day ranged from 100 to 500 fish). A total of 12 steelhead were recaptured for an overall trap efficiency of 1.69%. A pooled Peterson estimator with a Chapman modification was used to produce population estimates for wild Chinook fry and hatchery-reared steelhead based on the results of the mark-recapture experiments. The 2006 populations for Chinook and steelhead were estimated to be 381,554 (95% confidence intervals: 175,731-587,377) and 14,164 (6,999-21,330), respectively. The population estimates were based on the periods in which mark-recapture experiments were initialized through the end of the trapping season (10 May for steelhead and 1 June for Chinook).

  4. Optimized periodic verification testing blended risk and performance-based MOV inservice test program an application of ASME code case OMN-1

    SciTech Connect (OSTI)

    Sellers, C.; Fleming, K.; Bidwell, D.; Forbes, P.

    1996-12-01

    This paper presents an application of ASME Code Case OMN-1 to the GL 89-10 Program at the South Texas Project Electric Generating Station (STPEGS). Code Case OMN-1 provides guidance for a performance-based MOV inservice test program that can be used for periodic verification testing and allows consideration of risk insights. Blended probabilistic and deterministic evaluation techniques were used to establish inservice test strategies including both test methods and test frequency. Described in the paper are the methods and criteria for establishing MOV safety significance based on the STPEGS probabilistic safety assessment, deterministic considerations of MOV performance characteristics and performance margins, the expert panel evaluation process, and the development of inservice test strategies. Test strategies include a mix of dynamic and static testing as well as MOV exercising.

  5. Gordon Fee, part 1 | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Gordon Fee, part 1 Oral History Videos Speakers INTRODUCTION Ed Bailey Jim Bailey Kay Bailey Ken Bernander Willard Brock Wilma Brooks Elmer Brummitt Naomi Brummitt Blake Case Larry Case Patrick Case Dorothy Coker Gordon Fee Linda Fellers Louis Freels Marie Guy Nathan Henry Agnes Houser John Rice Irwin Harvey Kite Charlie Manning Alice Piercey Donald Raby Jack Rains Ray Smith Ken Sommerfeld Kay Steed Bill Wilcox Beverly Woods more ... Options Hide Chapters Show Transcript Gordon FeePart 1 |

  6. Gordon Fee, part 2 | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Gordon Fee, part 2 Oral History Videos Speakers INTRODUCTION Ed Bailey Jim Bailey Kay Bailey Ken Bernander Willard Brock Wilma Brooks Elmer Brummitt Naomi Brummitt Blake Case Larry Case Patrick Case Dorothy Coker Gordon Fee Linda Fellers Louis Freels Marie Guy Nathan Henry Agnes Houser John Rice Irwin Harvey Kite Charlie Manning Alice Piercey Donald Raby Jack Rains Ray Smith Ken Sommerfeld Kay Steed Bill Wilcox Beverly Woods more ... Options Hide Chapters Show Transcript Gordon FeePart 1 |

  7. Unique Fee-for-Service Revenues | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unique Fee-for-Service Revenues Unique Fee-for-Service Revenues Better Buildings Neighborhood Program Peer Exchange Calls on Program Sustainability: Unique Fee-for-Service Revenues, Call Slides and Discussion Summary, April 11, 2013. PDF icon Call Slides and Discussion Summary More Documents & Publications Programs: Operating as a Prime Contractor Assessing Revenue Streams: What Is Right for Your Program? Administering Nonprofit Energy Efficiency Programs

  8. Section L Attachment I - Summary and Fee Sheet Amendment 000002...

    National Nuclear Security Administration (NNSA)

    within the submitted MS Excel electronic spreadsheets and workbooks. Section L Attachment I Summary and Fee Sheet Amendment 000002 mulas and links intact and all cells...

  9. Sacramento Ordinance to Waive Fees for Solar Hot Water

    Broader source: Energy.gov [DOE]

    An ordinance suspending for the calendar years 2007-2009 all fees related to installations of solar water heaters on existing residences.

  10. Oregon Fees for Underground Injection Control Program Fact Sheet...

    Open Energy Info (EERE)

    Fees for Underground Injection Control Program Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material:...

  11. Wetland Permit Application Fees 2015 | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Wetland Permit Application Fees 2015PermittingRegulatory GuidanceGuide...

  12. WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE

    Broader source: Energy.gov (indexed) [DOE]

    WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE DOE F 4220.23 (06-95) U.S. DEPARTMENT OF ENERGY 1. CONTRACTOR IDENTIFICATION 2. TYPE OF ACQUISTION ACTION (REFER TO OFPP MANUAL, FEDERAL PROCUREMENT DATA SYSTEMS - PRODUCT AND SERVICE CODES. APRIL 1980) a. Name c. Street address b. Division (If any) d. City e. State f. Zip code a. SUPPLIES & EQUIPMENT b. RESEARCH & DEVELOPMENT c. SERVICES: (1) ARCHITECT-ENGINEER: (2) MANAGEMENT SERVICES: (3) MEDICAL: (4) OTHER (e.g., SUPPORT SERVICES) 3.

  13. Solar Access to Public Capital (SAPC) Working Group: Best Practices in PV System Installation; Version 1.0, March 2015; Period of Performance, October 2014 - September 2015

    SciTech Connect (OSTI)

    Doyle, C.; Truitt, A.; Inda, D.; Lawrence, R.; Lockhart, R.; Golden, M.

    2015-03-01

    The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligence activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.

  14. EM's Oak Ridge Office Contractor Scores High in Latest Award Fee Evaluation

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM gave URS | CH2M Oak Ridge LLC (UCOR) a score of nearly 96 percent, allowing the contractor to earn over $4.4 million of the available fee of more than $4.6 million for the period from April to September 2015. UCOR is responsible for cleaning up the East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, as well as other select sites on DOE’s Oak Ridge Reservation under a contract valued at $2.4 billion.

  15. Spent fuel management fee methodology and computer code user's manual.

    SciTech Connect (OSTI)

    Engel, R.L.; White, M.K.

    1982-01-01

    The methodology and computer model described here were developed to analyze the cash flows for the federal government taking title to and managing spent nuclear fuel. The methodology has been used by the US Department of Energy (DOE) to estimate the spent fuel disposal fee that will provide full cost recovery. Although the methodology was designed to analyze interim storage followed by spent fuel disposal, it could be used to calculate a fee for reprocessing spent fuel and disposing of the waste. The methodology consists of two phases. The first phase estimates government expenditures for spent fuel management. The second phase determines the fees that will result in revenues such that the government attains full cost recovery assuming various revenue collection philosophies. These two phases are discussed in detail in subsequent sections of this report. Each of the two phases constitute a computer module, called SPADE (SPent fuel Analysis and Disposal Economics) and FEAN (FEe ANalysis), respectively.

  16. Idaho Water Right Applications, Forms, and Fees Webpage | Open...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho Water Right Applications, Forms, and Fees Webpage Abstract This webpage provides an overview...

  17. Fact #901: November 30, 2015 States Assessing Fees on Electric...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    combination of Federal and state taxes collected at the pump from the sale of motor fuels. ... Idaho is the only state that has a fee for conventional hybrid electric vehicles (without ...

  18. Logistics & Fees - Combustion Energy Frontier Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Logistics & Fees Logistics & Fees Location/Accommodations The Summer School will be held on the beautiful campus of Princeton University. On-campus lodging in single-person, air-conditioned dormitory rooms with same-gender shared bath facilities is available to all participants(1). Breakfast, lunch and dinner meal plans are available to all participants. Participants may also choose to make arrangements to stay and dine at area hotels and restaurants. (1) Summer school dormitory

  19. DOE - NNSA/NFO -- Nuclear Testing Archive Fee Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Testing Archive > Fee Schedule NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Nuclear Testing Archive (NTA) Fee Schedule The U.S. Department of Energy National Nuclear Security Administration Nuclear Testing Archive (NTA) is a centralized repository of publicly releasable documents on the subject of the U.S. Nuclear Weapons Testing Program. The Nuclear Testing Archive is operated for the NNSA by NSTec. Normal services provided to the public by the Nuclear Testing

  20. Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of the adequacy of the fee being paid by nuclear power utilities...

  1. Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee |

    Energy Savers [EERE]

    Department of Energy Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee I adopt and approve the attached annual determination of the Director, Office of Standard Contract Management, that there is no reasonable basis at this time to conclude that either excess or insufficient funds are being collected and thus will not propose an adjustment to the fee to Congress; the fee will, therefore, remain at

  2. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Contract Cost: Contract Base Period: Contract Option Period: Minimum Fee (Base Fee) Maximum Fee (Award Fee) Performance Period Award Fee Available Award Fee Earned FY2010 $359,179 $289,238 FY2011 $725,476 $573,169 FY2012 $1,479,652 $1,339,065 FY2013 $1,499,253 $1,319,342 FY2014 $1,556,035 $1,447,113 FY2015 $1,435,629 FY2016* $564,658 Cumulative Fee $7,619,882 $4,967,927 DE-CI0000004 Fee Information $7,619,882 EM Contractor Fee Portsmouth Paducah Project Office Portsmouth Facility Support

  3. Past Performance Questionnaire

    National Nuclear Security Administration (NNSA)

    Contract Value: Initial Amount Current or Final Amount* Estimated Cost $ $ Fixed Price $ $ Fee/Profit $ $ Total Value $ $ *Should reflect any contract value increases/decreases since initial contract award II. PAST PERFORMANCE EVALUATION Please rate the Contractor as "Excellent" (E), "Good" (G), "Satisfactory" (S), "Unsatisfactory" (U), or "Not Applicable" (N/A) in the following areas: A. QUALITY OF PRODUCT OR SERVICES 1. Quality of product

  4. Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive's Input | Department of Energy 4 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Attached is Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project

  5. Privacy Act Fees and Time Limits | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Fees and Time Limits | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at

  6. Periodic review enhances LPG metering performance

    SciTech Connect (OSTI)

    Van Orsdol, F.G.

    1988-01-25

    Because of the loss of experienced personnel throughout the industry, the author says one must start over teaching the basics of liquid measurement. Warren Petroleum Co., a division of Chevron U.S.A. Inc., has developed a checklist review method for its metering systems, complete with enough explanation to allow the reviewer to understand why each item is important. Simultaneously, it continues with more in-depth and theoretical training in training course. This article describes the review process.

  7. Award Fee Determination Scorecard Contractor: Mission Support...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ratings: Objective: Excellent (98%) 12,910,813 Subjective: Very Good (63%) 3,607,813 The contractor met or exceeded the majority of performance goals and objectives for...

  8. Fact #901: November 30, 2015 States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue- Dataset

    Broader source: Energy.gov [DOE]

    Excel file and dataset for States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue

  9. Centerra Earns High Performance Rating for Savannah River Site Security Operations

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – The Savannah River Site (SRS) security contractor Centerra received high performance ratings from DOE in fiscal year 2015, earning $5,280,546 of the available $5,739,724 fee.

  10. HPMC_FY14_Performance_Assessment-Performance_Fee_Determination.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  11. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Target Fee Maximum Fee Performance Period Fee Available Fee Earned FY2016 $10,604,604 $0 FY2017 $9,627,727 $0 Cumulative Fee $20,232,331 $0 EM Contractor Fee Los Alamos Los Alamos Legacy Cleanup Bridge Contract December 2015 $20,232,331 CPAF Los Alamos National Security LLC $309,790,555 DE-EM0003528 $0 Fee Information September 30, 2015 - September 30, 2016 $0 October 1, 2016 - March 31, 2017 (Option Period 1) April 1, 2017 - September 30, 2017 (Option Period 2)

  12. Performance Based Incentive FY13 Contractor: Contract: DE-EM0001971

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Based Incentive FY13 Contractor: Contract: DE-EM0001971 Award Period: Metric 1: Quarter Cubic Meters x $800/m 3 = Fee Earned 1 st 1806.77 $800 $1,445,416 8/12/2013 2 nd 912.68 $800 $730,144 9/1/2013 3 rd 1,644.30 $800 $1,183,440 11/3/13 - fee of $1,315,440 reduced by $132,000 4 th 870.84 $800 $484,000 12/18/13 - available fee of 509,000 remaining reduced by $25,000 $3,843,000 Quarter Cubic Meters x $16,000/m 3 = Fee Earned 1 st 14.89 $16,000 $238,240 8/12/2013 2 nd 6.97 $16,000 $111,520 9/1/2013

  13. Total Estimated Contract Cost: Contract Option Period: Maximum...

    Office of Environmental Management (EM)

    & Wilcox Conversion Services, LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee EM Contractor Fee September 2015 Site: Portsmouth Paducah Project Office...

  14. Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy 8 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. PDF icon Policy Flash 2014-08.pdf PDF icon Acquisition Letter on provsional payment of fee for

  15. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Performance Period Fee Available Fee Earned FY2015 $5,553,915 FY2016 $5,553,915 FY2017 $5,553,915 Cumulative Fee $16,661,745 DE-EM0001131-DE-DT0007774 EM Contractor Fee December 2015 Portsmouth Paducah Project Office Paducah Deactivation Task Order Fluor Federal Services $16,661,745 N/A $0 Cost Plus Award Fee and FFP $422,000,000 July 22, 2014 - July 21, 2017 Fee Information

  16. Period meter for reactors

    DOE Patents [OSTI]

    Rusch, Gordon K.

    1976-01-06

    An improved log N amplifier type nuclear reactor period meter with reduced probability for noise-induced scrams is provided. With the reactor at low power levels a sampling circuit is provided to determine the reactor period by measuring the finite change in the amplitude of the log N amplifier output signal for a predetermined time period, while at high power levels, differentiation of the log N amplifier output signal provides an additional measure of the reactor period.

  17. GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions

    Broader source: Energy.gov [DOE]

    Consistent with the Administration's commitment to transparency, DOE General Counsel Scott Blake Harris has decided that all future determinations as to the adequacy of the Nuclear Waste Fund fee...

  18. Microsoft Word - DRAFT FY15 Award Fee Plan LATA - 09-19-2014...

    Office of Environmental Management (EM)

    convened, which includes meeting place, time, advising all PEB members, preparing the agenda, and taking minutes. The TL is an advisor to the PEB. 3. AWARD FEE STRUCTURE The...

  19. 16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security...

    Open Energy Info (EERE)

    LibraryAdd to library Legal Document- RegulationRegulation: 16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security RequirementsLegal Abstract These regulations...

  20. I.C. 42-221 - Appropriation of Water Fees | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: I.C. 42-221 - Appropriation of Water FeesLegal Abstract This statutory section provides for...

  1. NMAC 20.2.71 Air Quality Operating Permit Emissions Fees | Open...

    Open Energy Info (EERE)

    1 Air Quality Operating Permit Emissions Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NMAC 20.2.71 Air Quality...

  2. City of Santa Monica- Building Permit Fee Waiver for Solar Projects

    Broader source: Energy.gov [DOE]

    In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff...

  3. Title 43 CFR 3203.12 What Fees Must I Pay to Nominate Lands?...

    Open Energy Info (EERE)

    .12 What Fees Must I Pay to Nominate Lands? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR...

  4. Fee Waiver and Reduction Criteria | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fee Waiver and Reduction Criteria Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Advisory Exemptions How to Submit a FOIA Request Fee Waiver and Reduction Criteria Electronic Reading Room ISC Conventional Reading Rooms Reference Links Privacy Act NEPA Documents Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Don F. Thress, Jr. U.S. Department of

  5. Reclamation fee on coal production: an example of federal regulatory taxation

    SciTech Connect (OSTI)

    Reese, C.E.

    1983-09-01

    The coal mining reclamation fee is part of the federal government's efforts to regulate the strip mining of coal and to use proceeds from the fee for land use and pollution control problems associated with abandoned mines. Authorized by the 1977 Surface Mining Contol and Reclamation Act rather than the Internal Revenue Code, the exaction is still shown to be both a regulatory and a severance tax. 41 references. (DCK)

  6. Effluent fees: policy considerations on a source of revenue for infrastructure financing. Technical report

    SciTech Connect (OSTI)

    Casey, P.

    1988-01-01

    This project is part of the National Network for Environmental Management Studies conducted under the auspices of the Office of Cooperative Environmental Management - U.S. Environmental Protection Agency. With the phasing out of EPA's construction grants program and the implementation of State Revolving Funds (SRF's), it appears that more money will be needed for the financing of waste-water treatment facilities in the next twenty years. Infrastructure needs for waste-water treatment facilities will increase significantly due to required replacement and upgrading needs, while user fees may be significantly understated due to years of capital subsidies. With Federal seed capital for the SRF's stopping after 1994, alternative sources of funding will be necessary. An effluent fee program could both offer a way to make the polluter pay and provide a reliable financing mechanism for the SRF's. The paper discusses the experience of effluent fees in Europe, and proposes an effluent fee program that would provide needed capital to the State Revolving Fund. The fee would be tied into the National Pollutant Discharge Elimination System permits through gradual implementation. Various options for setting the fee and enforcement procedures are also discussed.

  7. Manufacturing and Performance Assessment of Stamped, Laser Welded, and Nitrided FeCrV Stainless Steel Bipolar Plates for Proton Exchange Membrane Fuel Cells

    SciTech Connect (OSTI)

    Brady, Michael P; Abdelhamid, Mahmoud; Dadheech, G; Bradley, J; Toops, Todd J; Meyer III, Harry M; Tortorelli, Peter F

    2013-01-01

    A manufacturing and single-cell fuel cell performance study of stamped, laser welded, and gas nitrided ferritic stainless steel foils in an advanced automotive bipolar plate assembly design was performed. Two developmental foil compositions were studied: Fee20Cre4V and Fee23Cre4V wt.%. Foils 0.1 mm thick were stamped and then laser welded together to create single bipolar plate assemblies with cooling channels. The plates were then surface treated by pre-oxidation and nitridation in N2e4H2 based gas mixtures using either a conventional furnace or a short-cycle quartz lamp infrared heating system. Single-cell fuel cell testing was performed at 80 C for 500 h at 0.3 A/cm2 using 100% humidification and a 100%/40% humidification cycle that stresses the membrane and enhances release of the fluoride ion and promotes a more corrosive environment for the bipolar plates. Periodic high frequency resistance potential-current scans during the 500 h fuel cell test and posttest analysis of the membrane indicated no resistance increase of the plates and only trace levels of metal ion contamination.

  8. Scoping Period Closed

    Broader source: Energy.gov [DOE]

    The environmental impact statement (EIS) scoping period has ended. DOE is preparing a Draft EIS that will analyze and compare the potential environmental impacts of various alternative approaches...

  9. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Available Fee Earned FY2014 $389,929 $358,735 FY2015 $392,092 FY2016 $397,054 Cumulative Fee $1,179,075 $358,735 $1,179,075 Cost Plus Award Fee $50,615,957 October 1, 2013 - September 30, 2016 Fee Information $0 Option 1: 10/1/16 - 9/30/18 DE-EM0002639 EM Contractor Fee December 2015 Portsmouth Paducah Project Office Portsmouth Environmental Technical Services II Restoration Services Inc

  10. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Available Fee Earned FY2010 $435,613 $283,148 FY2011 $806,501 $717,785 FY2012 $834,588 $825,720 FY2013 $933,700 $822,589 FY2014 $2,415,920 $2,295,124 FY2015 $2,781,656 Cumulative Fee $8,207,978 $4,944,366 EM Contractor Fee Portsmouth Paducah Project Office Paducah Infrastructure Contract December 2015 $8,207,978 Swift & Staley Mechanical Contractors Inc. DE-AC30-10CC40021 March 16, 2010 - November 30, 2015 Cost Plus Award Fee $137,637,795 Fee

  11. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Availability Fee Earned FY2013 $300,000 $284,250 FY2014 $310,000 $280,705 FY2015 $320,000 $287,680 FY2016 $330,000 FY2017 $340,000 FY2018 $350,000 Cumulative Fee $1,950,000 $852,635 EM Contractor Fee Richland Operations Office - Richland, WA Occupational Medical Services at Hanford December 2015 $100,100,000 $1,950,000 Option 2: 10/1/15 -9/30/16 (Exercised) HPM Corporation DE-EM0002043 Firm Fixed Price Plus Award Fee Fee Information $0 October 1, 2012 -

  12. Genealogy of periodic trajectories

    SciTech Connect (OSTI)

    de Adguiar, M.A.M.; Maldta, C.P.; de Passos, E.J.V.

    1986-05-20

    The periodic solutions of non-integrable classical Hamiltonian systems with two degrees of freedom are numerically investigated. Curves of periodic families are given in plots of energy vs. period. Results are presented for this Hamiltonian: H = 1/2(p/sub x//sup 2/ + p/sub y//sup 2/) + 1/2 x/sup 2/ + 3/2 y/sup 2/ - x/sup 2/y + 1/12 x/sup 4/. Properties of the families of curves are pointed out. (LEW)

  13. Scoping Period Open

    Broader source: Energy.gov [DOE]

    DOE has published in the Federal Register a Notice of Intent to prepare an environmental impact statement (EIS), and the scoping period is open for public comment for at least 30 days. DOE requests...

  14. Holding Period Complete

    Broader source: Energy.gov [DOE]

    DOE has published a Final Environmental Impact Statement (EIS), and the 30-day waiting period has ended. DOE is preparing a Record of Decision to announce and explain its chosen project alternative...

  15. Comment Period Closed Explained

    Broader source: Energy.gov [DOE]

    The public comment period on the Draft Environmental Impact Statement (EIS) has ended, and DOE is preparing a Final EIS. The Final EIS will consider and respond to all timely public comments on the...

  16. Integration of Multiple Contractors with Performance Type of Contracts

    SciTech Connect (OSTI)

    BURDGE, L.F.

    2000-09-24

    The management practices, procedures, and processes that are suited to managing Management and Operation (M&O) type of contracts at Department of Energy (DOE) sites, which were cost reimbursement with award fee, are not well suited to managing contracts where fee is determined by performance metrics. Thus a different style of management, requiring substantial revamping of the management process, is needed. This shift in philosophy also requires a dramatic shift in culture. This paper will describe how these changes are being managed at the River Protection Project (RPP), located at the DOE's Hanford Site in Washington State, one of DOE's largest and highest risk environmental clean-up project.

  17. DOE Rates EM’s Savannah River Site Contractor as ‘Very Good’ in Fee Determination Scorecard

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – In its award fee determination scorecard for fiscal year 2015, DOE gave the Savannah River Site’s (SRS) management and operations contractor an overall “very good” rating, allowing the company to receive $37.8 million, or 82.7 percent of its total fee of $45.7 million.

  18. Superior Energy Performance Enrollment and Application Forms | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Enrollment and Application Forms Superior Energy Performance Enrollment and Application Forms Superior Energy Performance logo Superior Energy Performance® (SEP(tm)), built on the ISO 50001 framework, provides a globally recognized system that facilities can use to improve their energy management and performance. ENROLL Enroll to gain access to resources for streamlining the SEP implementation process, such as program updates, tips, and phone support. No fees or commitment are

  19. Fact #901: November 30, 2015 States Assessing Fees on Electric Vehicles to

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Make Up For Lost Fuel Tax Revenue | Department of Energy 1: November 30, 2015 States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue Fact #901: November 30, 2015 States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue SUBSCRIBE to the Fact of the Week The maintenance of our highways has traditionally been funded from a combination of Federal and state taxes collected at the pump from the sale of motor fuels. Because electric vehicles (EVs) do

  20. Section L Attachment I - Summary and Fee Sheet Amendment 000002.xlsx

    National Nuclear Security Administration (NNSA)

    I Summary and Fee Sheet Amendment 000002 Nevada National Security Site Management and Operating (M&O) Contract PROPOSED 2017 Mgt Team Costs 2018 Mgt Team Costs Subtotal $0 FEE CLIN 0001 - Management and Operation of NNSS Base Term Year 1 Year 2 Year 3 Year 4 Year 5 Option Term Year 1 Year 2 Year 3 Year 4 Year 5 Subtotal $0 CLIN 0002 - Strategic Partnership Program Base Term Year 1 Year 2 Year 3 Year 4 Year 5 Option Term Year 1 Year 2 Year 3 Year 4 Year 5 Subtotal $0 TOTAL ALL $0 Mgt Team

  1. Energy Savings Performance Contracts Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Savings Performance Contracts Summary Energy Savings Performance Contracts Summary EM enters into contracts where the contractor is paid based on the amount of savings EM realizes due to lower energy costs as a result of upgrades the contractor provides. Learn more about this effort at this webpage. PDF icon Energy Savings Performance Contracts Summary More Documents & Publications Contractor Fee Payments - Small Sites Major Contracts Summary DOE IDIQ ESPC Contract Sample

  2. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Number: Contract Type: Total Estimated Contract Cost: Contract Base Period: Contract Option Periods: Minimum Fee Maximum Fee Performance Period Fee Available Fee Earned FY2009/2010 $22,386,342 $19,332,431 FY2011 $26,164,766 $23,956,349 FY2012 $21,226,918 $19,099,251 FY2013 $21,030,647 $19,352,402 FY2014 $18,986,489 $16,518,626 FY2015 $21,043,816 FY2016 FY2017 Cumulative Fee $130,838,978 $98,259,059 $130,838,978 EM Contractor Fee Richland Operations Office - Richland, WA Infrastructure and Site

  3. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Maximum Fee Performance Period Fee Available Fee Earned FY2008 $728,937 $0 FY2009 $728,937 $0 FY2010 $741,610 $0 FY2011 $786,779 $0 FY2012 $12,862 $12,862 FY2013 $1,111,678 $645 FY2014 $114,126 $114,126 FY2015 $110,253 $85,344 Cumulative Fee $4,335,182 $212,977 EM Contractor Fee Separations Process Research Unit (SPRU), Niskayuna, NY SPRU Deactivation, Demolition, and Removal of Contaminated Facilities September 2015 $4,335,182 Cost Plus Incentive Fee (FY2008-FY2011)/ Cost Plus Fixed Fee

  4. Scheduled Maintenance Periods | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Scheduled Maintenance Periods The CNM holds three maintenance periods per year. During these times certain CNM facilities may not be available for user activities. The Sector 26 beamline will not be available, the High-Performance Computing Cluster and nanofabrication facilities often are not available, and other facilities may undergo maintenance for only one or two days. Please contact your CNM Scientific Contact prior to arrival and plan your work visits and schedules accordingly. To better

  5. Better Buildings Neighborhood Program Peer Exchange Calls on Program Sustainability: Unique Fee-for-Service Revenues Call Slides and Discussion Summary, April 11, 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1, 2013 Better Buildings Neighborhood Program Peer Exchange Calls on Program Sustainability: Unique Fee-for-Service Revenues Call Slides and Discussion Summary Agenda * Welcome and Introductions  What are some unique fee-for-service revenues your program is implementing or considering? * Program Experience  Chris Jones, Greater Cincinnati Energy Alliance * Discussion Topics:  How can you determine the feasibility and financial potential of unique fee-for-service revenues?  How do you

  6. Better Buildings Neighborhood Program Sustainability Peer Exchange Call: Revenue from Contractor Fees, November 1, 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1, 2012 Better Buildings Neighborhood Program Sustainability Peer Exchange Call: Revenue from Contractor Fees Agenda and Discussion * Welcome and Call Purpose  This call was the first in a new series of calls focusing on topics relating to program sustainability. * Call Logistics and Participants  The call had 25 participants representing 16 Better Buildings Neighborhood Programs (see next slide). * Call participants discussed:  How programs are beginning to devise plans for a

  7. ANNEX A TO APPENDIX G, Standard Remittance Advice For Payment of Fees

    Gasoline and Diesel Fuel Update (EIA)

    Energy Information Administration Form NWPA-830G (Revised 03/12) ANNEX A TO APPENDIX G Standard Remittance Advice For Payment of Fees OMB No: 1901-0260 Expires: 3-31-2016 Burden: 5 Hours Section 1. Identification Information: Please first read the instructions on the back. Section 2. Net Electricity Generated Calculation 1.1 Purchaser Information: Item Unit 1 Unit 2 Unit 3 Station Total 1 1.11 Name:____________________________________________ 2.1 Unit ID Code: 1.12

  8. Report on Audit of Department of Energy Management and Operating Contractor Available Fees, IG-0390

    Energy Savers [EERE]

    AUDIT OF DEPARTMENT OF ENERGY MANAGEMENT AND OPERATING CONTRACTOR AVAILABLE FEES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative address: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov

  9. Equity of commercial low-level radioactive waste disposal fees. Report to Congress

    SciTech Connect (OSTI)

    1998-02-01

    In the Report accompanying the Fiscal Year 1997 Senate Energy and Water Development Appropriations Bill, the Senate Appropriations Committee directed the Department of Energy (DOE) to prepare a study of the costs of operating a low-level radioactive waste (LLW) disposal facility such as the one at Barnwell, South Carolina, and to determine whether LLW generators are paying equitable disposal fees. The disposal costs of four facilities are reviewed in this report, two operating facilities and two planned facilities. The operating facilities are located at Barnwell, South Carolina, and Richland, Washington. They are operated by Chem-Nuclear, LLC, (Chem-Nuclear), and US Ecology, Inc., (US Ecology), respectively. The planned facilities are expected to be built at Ward Valley, California, and Sierra Blanca, Texas. They will be operated by US Ecology and the State of Texas, respectively. This report found that disposal fees vary significantly among facilities for a variety of reasons. However, the information suggests that at each disposal facility, LLW generators pay equitable disposal fees.

  10. Policy Flash 2013-41 Contracts Periods of Performance Exceeding...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe....

  11. Parc Periodical | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Parc Periodical Parc Periodical PARC Periodical | Volume 7, Issue 2 PARC Periodical | Volume 7, Issue 1 PARC Periodical | Volume 6, Issue 6 PARC Periodical | Volume 6, Issue 5 PARC...

  12. Shortest recurrence periods of novae

    SciTech Connect (OSTI)

    Kato, Mariko [Department of Astronomy, Keio University, Hiyoshi, Yokohama 223-8521 (Japan); Saio, Hideyuki [Astronomical Institute, Graduate School of Science, Tohoku University, Sendai 980-8578 (Japan); Hachisu, Izumi [Department of Earth Science and Astronomy, College of Arts and Sciences, The University of Tokyo, 3-8-1 Komaba, Meguro-ku, Tokyo 153-8902 (Japan); Nomoto, Ken'ichi, E-mail: mariko@educ.cc.keio.ac.jp [Kavli Institute for the Physics and Mathematics of the Universe (WPI), The University of Tokyo, 5-1-5 Kashiwanoha, Kashiwa, Chiba 277-8583 (Japan)

    2014-10-01

    Stimulated by the recent discovery of the 1 yr recurrence period nova M31N 2008-12a, we examined the shortest recurrence periods of hydrogen shell flashes on mass-accreting white dwarfs (WDs). We discuss the mechanism that yields a finite minimum recurrence period for a given WD mass. Calculating the unstable flashes for various WD masses and mass accretion rates, we identified a shortest recurrence period of about two months for a non-rotating 1.38 M {sub ?} WD with a mass accretion rate of 3.6 10{sup 7} M {sub ?} yr{sup 1}. A 1 yr recurrence period is realized for very massive (? 1.3 M {sub ?}) WDs with very high accretion rates (? 1.5 10{sup 7} M {sub ?} yr{sup 1}). We revised our stability limit of hydrogen shell burning, which will be useful for binary evolution calculations toward Type Ia supernovae.

  13. SR0008

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wachenhut Receives Award Fee Flag Ribbon Art Note to Editors and News Directors The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services, Incorporated, for the evaluation period October 1, 1999, through March 31, 2000. A copy of the letter announcing DOE's award fee determination can be obtained by calling (803) 725-2889. -DOE- SR-00-08

  14. SR0302

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, 2003 Media Contact: Rick Ford (803) 725-2889 DOE Announces WSI Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services, Incorporated, for the evaluation period October 1, 2002, through March 31, 2003. The letter announcing DOE's award fee determination is available by calling (803)725-2889. -DOE- SR-03

  15. PARC Periodical | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PARC Periodical PARC Periodical February 16, 2016 PARC Periodical | Volume 7, Issue 3 VIEW ARTICLE HERE Read more about PARC Periodical | Volume 7, Issue 3 December 7, 2015 PARC Periodical | Volume 7, Issue 2 VIEW ARTICLE HERE Read more about PARC Periodical | Volume 7, Issue 2 October 12, 2015 PARC Periodical | Volume 7, Issue 1 VIEW ARTICLE HERE Read more about PARC Periodical | Volume 7, Issue 1 August 20, 2015 PARC Periodical | Volume 6, Issue 6 VIEW ARTICLE HERE Read more about PARC

  16. Down hole periodic seismic generator

    DOE Patents [OSTI]

    Hardee, Harry C. (Albuquerque, NM); Hills, Richard G. (Las Cruces, NM); Striker, Richard P. (Albuquerque, NM)

    1989-01-01

    A down hole periodic seismic generator system for transmitting variable frequency, predominantly shear-wave vibration into earth strata surrounding a borehole. The system comprises a unitary housing operably connected to a well head by support and electrical cabling and contains clamping apparatus for selectively clamping the housing to the walls of the borehole. The system further comprises a variable speed pneumatic oscillator and a self-contained pneumatic reservoir for producing a frequency-swept seismic output over a discrete frequency range.

  17. Advanced downhole periodic seismic generator

    DOE Patents [OSTI]

    Hardee, Harry C. (Albuquerque, NM); Hills, Richard G. (Las Cruces, NM); Striker, Richard P. (Albuquerque, NM)

    1991-07-16

    An advanced downhole periodic seismic generator system for transmitting variable frequency, predominantly shear-wave vibration into earth strata surrounding a borehole. The system comprises a unitary housing operably connected to a well head by support and electrical cabling and contains clamping apparatus for selectively clamping the housing to the walls of the borehole. The system further comprises a variable speed pneumatic oscillator and a self-contained pneumatic reservoir for producing a frequency-swept seismic output over a discrete frequency range.

  18. Diffuse Shortwave Intensive Observation Period

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Diffuse Shortwave Intensive Observation Period The Diffuse Shortwave IOP ran from September 23 to October 12, 2001. During this IOP, Joe Michalsky (The State University of New York-Albany) and Tom Stoffel (National Renewable Energy Laboratory) deployed approximately 15 radiometers of various designs and manufacturers on the SGP Radiometer Calibration Facility. The purpose was to compare the accuracy of the radiometers for diffuse shortwave measurements. The Scripps Institution of Oceanography

  19. Intensive Observation Period Projects Scheduled

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Intensive Observation Period Projects Scheduled Several IOP projects have been scheduled for the SGP CART site this spring. These projects either have already begun or will begin shortly. Radiosondes The RS-90 Transition IOP is currently under way. The RS-90 model radiosonde is gradually replacing the older RS-80 model. Radiosondes are instrument packages attached to and launched by weather balloons. The instruments measure atmospheric pressure, temperature, and relative humidity as the

  20. Periodicals collection management using a decision support system

    SciTech Connect (OSTI)

    Compton, M.L.; Moser, E.C.

    1993-12-31

    Sandia National Laboratories is a multiprogram national laboratory established in 1949. The Library currently uses DOBIS for its automated system, including the Periodicals Control function for periodical check-in. DOBIS performs processing and control functions adequately, but could not meet our reporting needs. Therefore the Library`s Periodicals Decision Team decided that they needed another ``system`` for collection management. A Periodicals Decision Support System was created using information downloaded from DOBIS and uploaded into dBASE IV. The Periodical Decision Support System functions as an information-processing system that has aided us in making collection management decisions for periodicals. It certainly allows us to do interactive ad-hoc analysis; although there are no modeling tools currently incorporated in the system. We hope that these modeling tools will come later. We have been gathering information and developing needed reports to achieve this goal.

  1. Periodic permanent magnet focused klystron

    DOE Patents [OSTI]

    Ferguson, Patrick; Read, Michael; Ives, R Lawrence

    2015-04-21

    A periodic permanent magnet (PPM) klystron has beam transport structures and RF cavity structures, each of which has permanent magnets placed substantially equidistant from a beam tunnel formed about the central axis, and which are also outside the extent of a cooling chamber. The RF cavity sections also have permanent magnets which are placed substantially equidistant from the beam tunnel, but which include an RF cavity coupling to the beam tunnel for enhancement of RF carried by an electron beam in the beam tunnel.

  2. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Period: Contract Option Period: Minimum Fee Maximum Fee Performance Period Fee Available Fee Earned FY2010 $524,019 $282,970 FY2011 $1,379,960 $1,026,899 FY2012 $4,800,033 $3,859,131 FY2013 $3,373,360 $3,019,607 FY2014 $1,109,635 $918,639 FY2015 $3,097,864 Cumulative Fee $14,284,871 $9,107,246 $14,284,871 N/A DE-AC30-10CC40020 EM Contractor Fee December 2015 Portsmouth Paducah Project Office Paducah Remediation Contract LATA of Kentucky $0 Cost Plus Award Fee $423,332,936 April 22, 2010 - July

  3. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Number: Contract Type: Total Estimated Contract Cost: Contract Base Period: Contract Option Period: Minimum Fee Target Fee Maximum Fee Performance Period Fee Available (N/A) Fee Earned (Equals 10% of Target) FY2005 $223,991 FY2006 $1,548,986 FY2007 $1,170,889 FY2008 $1,270,755 FY2009 $1,567,325 FY2010 $2,374,992 FY2011 $2,498,835 FY2012 $1,440,273 FY2013 $1,595,460 FY2014 $33,113,257 FY2015 $1,546,386 FY2016 $1,200,000 Cumulative Fee $49,551,149 N/A EM Contractor Fee Richland Operations Office -

  4. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract Base Period: Contract Option Period: Minimum Fee Maximum Fee Performance Period Fee Available Fee Earned FY2009 $0 $0 FY2010 $39,171,018 $34,660,005 FY2011 $31,370,000 $30,916,500 FY2012 $32,871,600 $32,071,600 FY2013 $31,597,837 $29,742,886 FY2014 $28,500,000 $26,852,887 FY2015 $22,140,000 $0 Cumulative Fee $185,650,455 $154,243,878 Cost Plus Award Fee $4,104,318,749 $185,650,455 July 1, 2009 - June 30, 2015 Two Options: 07/1/15 to 6/30/17 DE-AC09-09SR22505 Fee Information $0 EM

  5. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Energy Savers [EERE]

    Contract Base Period: Contract Option Period: Minimum Fee Maximum Fee Performance Period Fee Available Fee Earned FY2009 $0 $0 FY2010 $39,171,018 $34,660,005 FY2011 $31,370,000 $30,916,500 FY2012 $32,871,600 $32,071,600 FY2013 $31,597,837 $29,742,886 FY2014 $28,500,000 $26,852,887 FY2015 $30,167,000 $0 Cumulative Fee $193,677,455 $154,243,878 DE-AC09-09SR22505 Fee Information $0 EM Contractor Fee Savannah River Site Office - Aiken, SC Liquid Waste Processing Contract December 2015 Savannah

  6. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Energy Savers [EERE]

    Fee Target Fee Maximum Fee Performance Period Fee Available (N/A) Fee Earned FY2002 $15,829 FY2003 $523,056 FY2004 $276,342 FY2005 $941,713 FY2006 $2,856,570 FY2007 $2,972,377 FY2008 $5,223,667 FY2009 $10,018,301 FY2010 $5,696,426 FY2011 $0 FY2012 $0 FY2013 -$20,000,000 FY2014 FY2015 FY2016 Cumulative Fee $8,524,281 Parsons Infrastructure and Technology Group DE-AC09-02SR22210 Fee Information N/A EM Contractor Fee Savannah River Site Office - Aiken, SC Salt Waste Processing Contract December

  7. Property:Maximum Wave Height(m) at Wave Period(s) | Open Energy...

    Open Energy Info (EERE)

    at Wave Period(s) Jump to: navigation, search Property Name Maximum Wave Height(m) at Wave Period(s) Property Type String Pages using the property "Maximum Wave Height(m) at Wave...

  8. Section L - Attachment D - Past-Performance Information Form

    National Nuclear Security Administration (NNSA)

    L, Attachment E, Page 1 SECTION L ATTACHMENT E PAST PERFORMANCE INFORMATION FORM 1. Complete Name of Offeror or Team Member 2. Contract Title and Location 3. Customer Name, Current Address, Telephone Number and E-mail 4. Contract Number and Type of Contract 5. Date of Contract Award 6. Date Work Commenced 7. Date the Work was Completed 8. Initial Contract Price /Estimated Cost and Fee 9. Final Amount Invoiced/Amount Invoiced to Date 10a. Technical Point of Contact (see instruction below) 10b.

  9. Section L - Attachment D - Past-Performance Information Form

    National Nuclear Security Administration (NNSA)

    E, Page 1 SECTION L ATTACHMENT E PAST PERFORMANCE INFORMATION FORM 1. Complete Name of Offeror or Team Member 2. Contract Title and Location 3. Customer Name, Current Address, Telephone Number and E-mail 4. Contract Number and Type of Contract 5. Date of Contract Award 6. Date Work Commenced 7. Date the Work was Completed 8. Initial Contract Price /Estimated Cost and Fee 9. Final Amount Invoiced/Amount Invoiced to Date 10a. Technical Point of Contact (see instruction below) 10b. Contracting

  10. Development of Seismic Isolation Systems Using Periodic Materials

    SciTech Connect (OSTI)

    Yan, Yiqun; Mo, Yi-Lung; Menq, Farn-Yuh; Stokoe, II, Kenneth H.; Perkins, Judy; Tang, Yu

    2014-12-10

    Advanced fast nuclear power plants and small modular fast reactors are composed of thin-walled structures such as pipes; as a result, they do not have sufficient inherent strength to resist seismic loads. Seismic isolation, therefore, is an effective solution for mitigating earthquake hazards for these types of structures. Base isolation, on which numerous studies have been conducted, is a well-defined structure protection system against earthquakes. In conventional isolators, such as high-damping rubber bearings, lead-rubber bearings, and friction pendulum bearings, large relative displacements occur between upper structures and foundations. Only isolation in a horizontal direction is provided; these features are not desirable for the piping systems. The concept of periodic materials, based on the theory of solid-state physics, can be applied to earthquake engineering. The periodic material is a material that possesses distinct characteristics that prevent waves with certain frequencies from being transmitted through it; therefore, this material can be used in structural foundations to block unwanted seismic waves with certain frequencies. The frequency band of periodic material that can filter out waves is called the band gap, and the structural foundation made of periodic material is referred to as the periodic foundation. The design of a nuclear power plant, therefore, can be unified around the desirable feature of a periodic foundation, while the continuous maintenance of the structure is not needed. In this research project, three different types of periodic foundations were studied: one-dimensional, two-dimensional, and three-dimensional. The basic theories of periodic foundations are introduced first to find the band gaps; then the finite element methods are used, to perform parametric analysis, and obtain attenuation zones; finally, experimental programs are conducted, and the test data are analyzed to verify the theory. This procedure shows that the periodic foundation is a promising and effective way to mitigate structural damage caused by earthquake excitation.

  11. Annual Performance Report FY 2011 Annual Performance Plan FY 2012

    Energy Savers [EERE]

    Annual Performance Report FY 2011 Annual Performance Plan FY 2012 2 FY 2011 OIG Performance Results The OIG measures its performance against long-term and annual goals set forth in OIG planning documents. During this reporting period, the OIG successfully achieved its FY 2011 performance goals. The following are the specific results: Goal 1 Promote Presidential Reform Initiatives, Secretarial Mission Priorities, and Congress Objective 1: Conduct reviews seeking positive change in the Department

  12. FY14 AWARD FEE DETERMINATION SCORECARD Contractor: Wastren-EnergX...

    Office of Environmental Management (EM)

    for the period. Significant Achievements: * Received the Federal Electronic Challenge Gold Award illustrating the site's commitment to sustainability. * Deployed the Virtual...

  13. Seismic isolation of two dimensional periodic foundations

    SciTech Connect (OSTI)

    Yan, Y.; Mo, Y. L.; Laskar, A.; Cheng, Z.; Shi, Z.; Menq, F.; Tang, Y.

    2014-07-28

    Phononic crystal is now used to control acoustic waves. When the crystal goes to a larger scale, it is called periodic structure. The band gaps of the periodic structure can be reduced to range from 0.5?Hz to 50?Hz. Therefore, the periodic structure has potential applications in seismic wave reflection. In civil engineering, the periodic structure can be served as the foundation of upper structure. This type of foundation consisting of periodic structure is called periodic foundation. When the frequency of seismic waves falls into the band gaps of the periodic foundation, the seismic wave can be blocked. Field experiments of a scaled two dimensional (2D) periodic foundation with an upper structure were conducted to verify the band gap effects. Test results showed the 2D periodic foundation can effectively reduce the response of the upper structure for excitations with frequencies within the frequency band gaps. When the experimental and the finite element analysis results are compared, they agree well with each other, indicating that 2D periodic foundation is a feasible way of reducing seismic vibrations.

  14. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Cost (Exercised CLINs,excluding fee): Contract Base Period: Contract Option Period: Minimum Fee Maximum Fee (Exercised CLINs) Performance Period Fee Available Fee Earned FY2012 $15,763,807 $15,087,078 FY2013-01 $10,763,331 $10,402,078 FY2013-02 $16,098,142 $15,775,605 FY2014-01 $3,433,270 $3,219,034 FY2014-02* $17,977,254 $31,966,742 FY2015-01 $6,178,183 $6,016,799 FY2015-02 $8,716,668 $8,524,378 FY2016-01** $7,484,019 $2,528,489 Cumulative Fee $86,414,674 $93,520,203 *$14,150,224 of $28,300,488

  15. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Energy Savers [EERE]

    Contract Base Period: Contract Option Period: Minimum Fee Maximum Fee Performance Period Fee Available Fee Earned FY2008 $2,550,203 $2,550,203 FY2009 $42,649,069 $36,473,354 FY2010 $69,660,249 $64,874,187 FY2011 $48,750,000 $44,329,841 FY2012 $48,950,000 $41,492,503 FY2013 $122,283,499 $66,203,499 FY2014 $144,860,240 $138,233,496 FY2015 $45,730,000 $37,853,814 FY2016 $44,930,000 Cumulative Fee $570,363,260 $432,010,897 EM Contractor Fee Savannah River Site Office, Aiken, SC Management &

  16. PARC Periodical | Vol. 6, Issue 4 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PARC Periodical | Vol. 6, Issue 4 April 6, 2015 PARC Periodical | Vol. 6, Issue 4 VIEW PERIODICAL HERE

  17. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fee Maximum Fee Performance Period Fee Availability Fee Earned FY2010 $3,667,493 $3,422,993 FY2011 $5,041,415 $4,688,516 FY2012 $5,204,095 $5,021,952 FY2013 $5,428,947 $4,533,171 FY2014 $5,554,162 $4,970,975 FY2015 $5,739,724 $2,582,876 FY2016 $5,925,249 FY2017 $6,124,360 Cumulative Fee $42,685,445 $25,220,482 Centerra, LLC DE-AC30-10CC60025 Cost Plus Award Fee $989,000,000 January 1, 2010 - October 7, 2014 EM Contractor Fee Savannah River Site Office - Aiken, SC Comprehensive Security Services

  18. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Energy Savers [EERE]

    Fee Maximum Fee Performance Period Fee Availability Fee Earned FY2010 $3,667,493 $3,422,993 FY2011 $5,041,415 $4,688,516 FY2012 $5,204,095 $5,021,952 FY2013 $5,428,947 $4,533,171 FY2014 $5,554,162 $4,970,975 FY2015 $5,739,724 $5,280,546 FY2016 $5,925,249 FY2017 $6,124,360 Cumulative Fee $42,685,445 $27,918,152 EM Contractor Fee Savannah River Site Office - Aiken, SC Comprehensive Security Services December 2015 Fee Information $42,685,445 $0 Option 1: 10/8/14 to 10/07/17 (exercised) Option 2:

  19. Do triatomic molecules echo atomic periodicity?

    SciTech Connect (OSTI)

    Hefferlin, R. Barrow, J.

    2015-03-30

    Demonstrations of periodicity among triatomic-molecular spectroscopic constants underscore the role of the periodic law as a foundation of chemistry. The objective of this work is to prepare for another test using vibration frequencies ?{sub 1} of free, ground-state, main-group triatomic molecules. Using data from four data bases and from computation, we have collected ?{sub 1} data for molecules formed from second period atoms.

  20. Performance Monitoring

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization » Performance Monitoring Performance Monitoring A redirector page has been set up without anywhere to redirect to. Last edited: 2016-02-01 08:06:18

  1. Optimizing Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimizing Performance Optimizing Performance Storage Optimization Optimizing the sizes of the files you store in HPSS and minimizing the number of tapes they are on will lead to...

  2. Performance Monitoring

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Performance Monitoring Performance Monitoring A redirector page has been set up without anywhere to redirect to. Last edited: 2014-08-25 14:37:27...

  3. SR0009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 8, 2000 Media Contact: Rick Ford (803) 725-2889 WSRC Receives Award Fee Flag Ribbon Art Note to Editors and News Directors The Department of Energy (DOE) has determined the performance award fee earned by Westinghouse Savannah River Company for the evaluation period October 1, 1999, through March 31, 2000. To obatin a copy of the letter announcing DOE's award fee determination click here or call (803) 725-2889 -DOE- SR-00-08

  4. SR0015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2000 Media Contact: Jim Giusti (803) 725-2889 WSRC Receives Award Fee Flag Ribbon Graphic Note to Editors and News Directors The Department of Energy (DOE) has determined the performance award fee earned by Westinghouse Savannah River Company for the evaluation period April 1, 2000, through September 30, 2000. To obatin a copy of the letter announcing DOE's award fee determination click here or call (803) 725-2889 -DOE- SR-00-15 | Back |

  5. SR0018

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rick Ford (803) 725-2889 Wackenhut Receives Award Fee Flag Ribbon Graphic The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services, Incorporated, for the evaluation period April 1, 2000, through September 30, 2000. To obatin a copy of the letter announcing DOE's award fee determination click here or call (803) 725-2889. -DOE- SR-00-18

  6. SR9805

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16, 1999 Media Contact: Rick Ford (803) 725-2889 WSCR Receives Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fees earned by Westinghouse Savannah River Company for the evaluation period October 1, 1998, through March 31, 1999. The letter announcing DOE's award fee determination is available by calling (803)725-2889. -DOE- SR-98-05

  7. SR9917

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 1999 Media Contact: Rick Ford (803) 725-2889 WSCR Receives Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fees earned by Westinghouse Savannah River Company for the evaluation period April 1, 1999, through September 30, 1999. The letter announcing DOE's award fee determination is available by calling (803)725-2889. -DOE- SR-99-17

  8. PARC Periodical | Vol. 6, Issue 3 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vol. 6, Issue 3 February 9, 2015 PARC Periodical | Vol. 6, Issue 3 View Periodical Here

  9. Energy Savings Performance Contract ENABLE Awarded Projects ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Cost Savings Period of Performance Estimated Annual Energy Savings*** Hammond Courthouse (Indiana) U.S. General Services Administration 92515 Green Generation ...

  10. Variable-Period Undulators For Synchrotron Radiation

    DOE Patents [OSTI]

    Shenoy, Gopal (Naperville, IL); Lewellen, John (Plainfield, IL); Shu, Deming (Darien, IL); Vinokurov, Nikolai (Novosibirsk, RU)

    2005-02-22

    A new and improved undulator design is provided that enables a variable period length for the production of synchrotron radiation from both medium-energy and high-energy storage rings. The variable period length is achieved using a staggered array of pole pieces made up of high permeability material, permanent magnet material, or an electromagnetic structure. The pole pieces are separated by a variable width space. The sum of the variable width space and the pole width would therefore define the period of the undulator. Features and advantages of the invention include broad photon energy tunability, constant power operation and constant brilliance operation.

  11. Survey of lands held for uranium exploration, development, and production in fourteen western states in the six month period ending June 30, 1979

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    The statistics set forth for the period covered by this report are based on data gathered from records available to the public. These data were derived from public county records of mining claim locations, from the public reports of state and Federal land offices, from commercial reporting services, and from annual reports to stockholders of land companies. Accordingly, if any fee land has been acquired in a private transaction which has not been entered into a public record or report, that land will not be accounted for in this report. The figures for the acreage controlled at the beginning of the calendar year are those that were published for that date in the publication entitled Statistical Data of the Uranium Industry GJO-100(78).

  12. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Contract Option Period: Minimum Fee Maximum Fee Performance Period Fee Available Fee Earned FY2009 $26,647,324 $19,757,181 FY2010 $35,264,395 $22,009,931 FY2011 $70,699,523 $69,100,507 FY2012 $18,134,034 $12,265,000 FY2013 $17,766,524 $4,910,099 FY2014 $13,315,000 $9,659,555 FY2015 $11,500,000 $0 FY2016 $12,025,000 FY2017 $11,500,000 FY2018 $11,639,576 Cumulative Fee $228,491,376 $137,702,273 Option 1: 10/1/13 - 9/30/18 (exercised) June 19, 2008 -September 30, 2013 EM Contractor Fee Richland

  13. SR0106

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    31, 2001 Media Contact: Rick Ford (803) 725-2889 DOE Announces Wackenhut Services Inc. Award Fee Flag Ribbon Art Note To Editors and News Directors: The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services, Incorporated, for the evaluation period October 1, 2000, through March 31, 2001. -DOE- SR-01-06

  14. Periodic subsystem density-functional theory

    SciTech Connect (OSTI)

    Genova, Alessandro; Pavanello, Michele; Ceresoli, Davide

    2014-11-07

    By partitioning the electron density into subsystem contributions, the Frozen Density Embedding (FDE) formulation of subsystem Density Functional Theory (DFT) has recently emerged as a powerful tool for reducing the computational scaling of KohnSham DFT. To date, however, FDE has been employed to molecular systems only. Periodic systems, such as metals, semiconductors, and other crystalline solids have been outside the applicability of FDE, mostly because of the lack of a periodic FDE implementation. To fill this gap, in this work we aim at extending FDE to treat subsystems of molecular and periodic character. This goal is achieved by a dual approach. On one side, the development of a theoretical framework for periodic subsystem DFT. On the other, the realization of the method into a parallel computer code. We find that periodic FDE is capable of reproducing total electron densities and (to a lesser extent) also interaction energies of molecular systems weakly interacting with metallic surfaces. In the pilot calculations considered, we find that FDE fails in those cases where there is appreciable density overlap between the subsystems. Conversely, we find FDE to be in semiquantitative agreement with KohnSham DFT when the inter-subsystem density overlap is low. We also conclude that to make FDE a suitable method for describing molecular adsorption at surfaces, kinetic energy density functionals that go beyond the GGA level must be employed.

  15. PARC Periodical | Volume 7, Issue 3 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center PARC Periodical | Volume 7, Issue 3 February 16, 2016 PARC Periodical | Volume 7, Issue 3 VIEW ARTICLE HERE News/Media PARC Periodical

  16. Magnetomechanically induced long period fiber gratings

    SciTech Connect (OSTI)

    Causado-Buelvas, Jesus D.; Gomez-Cardona, Nelson D.; Torres, Pedro

    2008-04-15

    In this work, we report a simple, flexible method to create long period fiber gratings mechanically by controlling the repulsion/attraction force between two magnets that pressing a plate with a periodic array of small glass cylinders to a short length of optical fiber. Via the photoelastic effect, the pressure points induce the required periodic refractive index modulation to create the LPFG. We found that the induced device exhibits spectral characteristics similar to those of other types of LPFG. As the optical properties of LPFGs are directly related to the nature of the applied perturbations, we show, to our knowledge for the frrst time, how is the evolution of birefringence effects in mechanically induced LPFGs.

  17. Off-site Intensive Operational Period

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 ARM Participating in Off-site Intensive Operational Period The ARM Program is playing a role in the Cirrus Regional Study of Tropical Anvils and Cirrus Layers-Florida Area Cirrus Experiment (CRYSTAL-FACE) intensive operational period (IOP), under way through July in South Florida. The objective of CRYSTAL-FACE is to investigate the physical properties and formation processes of tropical cirrus clouds. The ARM Program has deployed a suite of ground-based instruments in Florida for CRYSTAL-FACE

  18. Performance Characterization

    Broader source: Energy.gov [DOE]

    Performance characterization efforts within the SunShot Systems Integration activities focus on collaborations with U.S. solar companies to:

  19. Performance Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by the Environmental Protection Agency (EPA) and the Nuclear Regulatory Commission (NRC) regulations as a process to be used in estimating the long-term performance of deep...

  20. Performance Modeling

    Office of Scientific and Technical Information (OSTI)

    ... of these components on our testbed machines using a minimal number of input attributes. ... that can predict an algorithm's performance using a minimal set of input parameters. ...

  1. S. 42: A Bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil and refined petroleum products. Introduced in the Senate of the United States, One Hundredth First Congress, First Session, January 25, 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    S. 42 is a bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil and refined petroleum products.

  2. PARC Periodical | Vol. 6, Issue 1 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 October 1, 2014 PARC Periodical | Vol. 6, Issue 1

  3. PARC Periodical | Vol. 6, Issue 2 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 December 1, 2014 PARC Periodical | Vol. 6, Issue 2

  4. SES Probationary Period | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... when your performance may not meet acceptable standards and taking corrective action. Adhering to all Federal regulations governing conduct, fitness, suitability, and ethics. ...

  5. U. S. Department of Energy Savannah River Operations Office - Contractor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Contractor Performance Contractor Performance SRNS FY 15 Award Fee Determination Scorecard Adobe Acrobat PDF FY 14 Award Fee Determination Scorecard Adobe Acrobat PDF FY 13 Award Fee Determination Scorecard Adobe Acrobat PDF Award Fee Determination for FY 13 Adobe Acrobat PDF Award Fee Determination for FY 12 Adobe Acrobat PDF Award Fee Determination for FY 11 Adobe Acrobat PDF Award Fee Determination for FY 10 Adobe Acrobat PDF Award Fee Determination for FY 09 Adobe Acrobat PDF

  6. Optimizing Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimizing Performance Optimizing Performance Storage Optimization Optimizing the sizes of the files you store in HPSS and minimizing the number of tapes they are on will lead to the most effient use of NERSC HPSS: File sizes of about 1 GB or larger will give the best network performance (see graph below) Files sizes greater than about 500 GB can be more difficult to work with and lead to longer transfer times. Files larger than 15 TB cannot be uploaded to HPSS. Aggregate groups of small files

  7. Presidential Performance Contracting Challenge: Performance Toward...

    Office of Environmental Management (EM)

    Presidential Performance Contracting Challenge: Performance Toward New 4 Billion Goal Presidential Performance Contracting Challenge: Performance Toward New 4 Billion Goal...

  8. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Maximum Fee Performance Period Fee Available Fee Earned FY2011 $0 $0 FY2012 $3,463,912 $200,000 FY2013 $3,463,912 $350,000 FY2014 $4,535,359 $175,000 FY2015 $8,141,680 $410,000 FY2016 $4,112,058 FY2017 $4,112,058 FY2018 $4,112,058 FY2019 $1,860,997 Cumulative Fee $33,802,034 $1,135,000 EM Contractor Fee West Valley Demonstration Project - West Valley, NY West Valley Demonstration Project Phase 1 Decommissioning - Facility Disposition December 2015 $59,039,818 Cost Plus Award Fee $494,970,881

  9. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Performance Period Fee Available Fee Earned FY2011 $6,190,992 $5,779,687 FY2012 $16,380,944 $14,173,044 FY2013 $16,972,816 $12,693,413 FY2014 $15,520,007 $13,207,526 FY2015 $14,269,197 FY2016 $23,819,121 Cumulative Fee $93,153,077 $45,853,670 $93,153,077 $0 Cost-Plus-Award-Fee $1,684,717,283 March 29, 2011 - March 28, 2016 Fee Information Option 1: 3/29/16 -9/28/18 Option 1a: 9/29/18 - 3/28/21 DE-AC30-10CC40017 EM Contractor Fee December 2015 Portsmouth Paducah Project Office Portsmouth D&D

  10. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract Base Period: Contract Option Period: Minimum Fee Maximum Fee Performance Period Fee Available Fee Earned FY2008 $2,550,203 $2,550,203 FY2009 $42,649,069 $36,473,354 FY2010 $69,660,249 $64,874,187 FY2011 $48,750,000 $44,329,841 FY2012 $48,950,000 $41,492,503 FY2013 $122,283,499 $66,203,499 FY2014 $144,860,240 $138,233,496 FY2015 $45,730,000 $0 FY2016 $44,930,000 Cumulative Fee $570,363,260 $394,157,083 $9,400,000,000 Savannah River Nuclear Solutions LLC August 1, 2008 - July 31, 2013

  11. Performance Evaluation Plan (PEP) Pantex Plant Babcock & Wilcox Technical Services Pantex, LLC Contract No. DE-AC54-00AL66620

    National Nuclear Security Administration (NNSA)

    2 Performance Evaluation Plan (PEP) Pantex Plant Babcock & Wilcox Technical Services Pantex, LLC Contract No. DE-AC54-00AL66620 October 1, 2011 to September 30, 2012 A. Pursuant to the terms and conditions of the Contract, this Performance Evaluation Plan (PEP) sets forth the criteria upon which the Contractor's performance of work under the contract will be evaluated and upon which the determination of the total available fee amount earned shall be based. B. The base PEP is composed of

  12. Application Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NESAP Application Porting and Performance IXPUG Performance and Debugging Tools Measuring Arithmetic Intensity Training & Tutorials Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov

  13. Down-hole periodic seismic generator

    DOE Patents [OSTI]

    Hardee, H.C.; Hills, R.G.; Striker, R.P.

    1982-10-28

    A down hole periodic seismic generator system is disclosed for transmitting variable frequency, predominantly shear-wave vibration into earth strata surrounding a borehole. The system comprises a unitary housing operably connected to a well head by support and electrical cabling and contains clamping apparatus for selectively clamping the housing to the walls of the borehole. The system further comprises a variable speed pneumatic oscillator and a self-contained pneumatic reservoir for producing a frequency-swept seismic output over a discrete frequency range.

  14. Mo Year Report Period: EIA ID NUMBER:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mo Year Report Period: EIA ID NUMBER: http://www.eia.gov/survey/form/eia_14/instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https://signon.eia.doe.gov/upload/noticeoog.jsp Electronic Transmission: The PC Electronic Zip Code - Data Reporting Option (PEDRO) is available. If interested in software, call (202) 586-9659. Email form to: OOG.SURVEYS@eia.doe.gov - - - - Fax form to: (202) 586-9772 Mail form to: Oil & Gas Survey Email address: U.S.

  15. Performance Degradation of LSCF Cathodes

    SciTech Connect (OSTI)

    Alinger, Matthew

    2013-09-30

    This final report summarizes the progress made during the October 1, 2008 - September 30, 2013 period under Cooperative Agreement DE-NT0004109 for the U. S. Department of Energy/National Energy Technology Laboratory (USDOE/NETL) entitled Performance Degradation of LSCF Cathodes. The primary objective of this program is to develop a performance degradation mitigation path for high performing, cost-effective solid oxide fuel cells (SOFCs). Strategies to mitigate performance degradation are developed and implemented. In addition, thermal spray manufacturing of SOFCs is explored. Combined, this work establishes a basis for cost-effective SOFC cells.

  16. Property:Building/EndPeriod | Open Energy Information

    Open Energy Info (EERE)

    EndPeriod Jump to: navigation, search This is a property of type Date. End of the period (last day of the month) Pages using the property "BuildingEndPeriod" Showing 25 pages...

  17. Performance Characterization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Characterization for Fusion Co-design Applications Praveen Narayanan, Alice Koniges, Leonid Oliker, Robert Preissl, Samuel Williams, Nicholas J. Wright, Lawrence Berkeley National Laboratory Maxim Umansky, Xueqiao Xu, Lawrence Livermore National Laboratory Benjamin Dudson, University of York Stephane Ethier, Weixing Wang, Princeton Plasma Physics Laboratory Jeff Candy, General Atomics John R. Cary, Tech-X ABSTRACT: Magnetic fusion is a long-term solution for producing electrical

  18. Economic Performance

    Office of Environmental Management (EM)

    09 Executive Order 13514-Federal Leadership in Environmental, Energy, and Economic Performance October 5, 2009 By the authority vested in me as President by the Constitution and the laws of the United States of America, and to establish an integrated strategy towards sustainability in the Federal Government and to make reduction of greenhouse gas emissions a priority for Federal agencies, it is hereby ordered as follows: Section 1. Policy. In order to create a clean energy economy that will

  19. Combustion fume structure and dynamics. Period of performance: 8/16/91--2/15/92

    SciTech Connect (OSTI)

    Flagan, R.C.

    1992-12-31

    During pulverized coal combustion, a fume of submicron particles is formed when minerals that have volatilized from the parent coal nucleate to form new particles. The particles thus generated are extremely small, but they grow rapidly due to Brownian coagulation. Much has been learned about these fine particles in experimental studies of the particles formed in coal combustion. Measurements of the variation of chemical composition with particle size clearly demonstrate that the particles smaller than about 0.1 {mu}m in diameter are formed from vapors while larger particles are dominated by residues from the mineral matter in the coal. Theoretical predictions of the evolution of the particle size distribution suggest that the nuclei should produce a sharp peak which may approach 0.1 {mu}m, but they are unlikely to grow much beyond that size in the limited time available in practical combustors. The focus of this research program is on elucidating the fundamental processes that determine the particle size distribution, composition, and agglomerate structures of coal ash fumes. The ultimate objective of this work is the development and validation of a model for the dynamics of combustion fumes, describing both the evolution of the particle size distribution and the particle morphology. The study employs model systems to address the fundamental questions and to provide rigorous validation of the models to be developed. This first phase of the project has been devoted to the development of a detailed experimental strategy that will allow agglomerates with a broad range of fractal dimensions to be studied in the laboratory.

  20. Alloy development for irradiation performance. Quarterly progress report for period ending June 30, 1980

    SciTech Connect (OSTI)

    Ashdown, B.G.

    1980-10-01

    This report is organized along topical lines in parallel to a Program Plan of the same title so that activities and accomplishments may be followed readily relative to that Program Plan. Thus, the work of a given laboratory may appear throughout the report. Chapters 1, 2, 8, and 9 review activities on analysis and evaluation, test methods development, status of irradiation experiments, and corrosion testing and hydrogen permeation studies, respectively. These activities relate to each of the alloy development paths. Chapters 3, 4, 5, 6, and 7 present the ongoing work on each alloy development path. The Table of Contents is annotated for the convenience of the reader.

  1. Logic elements for reactor period meter

    DOE Patents [OSTI]

    McDowell, William P.; Bobis, James P.

    1976-01-01

    Logic elements are provided for a reactor period meter trip circuit. For one element, first and second inputs are applied to first and second chopper comparators, respectively. The output of each comparator is O if the input applied to it is greater than or equal to a trip level associated with each input and each output is a square wave of frequency f if the input applied to it is less than the associated trip level. The outputs of the comparators are algebraically summed and applied to a bandpass filter tuned to f. For another element, the output of each comparator is applied to a bandpass filter which is tuned to f to give a sine wave of frequency f. The outputs of the filters are multiplied by an analog multiplier whose output is 0 if either input is 0 and a sine wave of frequency 2f if both inputs are a frequency f.

  2. Periodic Trends in Highly Dispersed Groups IV and V Supported...

    Office of Scientific and Technical Information (OSTI)

    Periodic Trends in Highly Dispersed Groups IV and V Supported Metal Oxide Catalysts for ... Title: Periodic Trends in Highly Dispersed Groups IV and V Supported Metal Oxide Catalysts ...

  3. Mirant: Summary of Monitored SO2 Concentrations During Periods...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    during periods of highest impact as well as ERMOD modeling results for SO2 scenarios. PDF icon Mirant: Summary of Monitored SO2 Concentrations During Periods of Highest...

  4. Negative Effective Gravity in Water Waves by Periodic Resonator...

    Office of Scientific and Technical Information (OSTI)

    Negative Effective Gravity in Water Waves by Periodic Resonator Arrays Prev Next Title: Negative Effective Gravity in Water Waves by Periodic Resonator Arrays Authors: Hu,...

  5. EIS-0374: Notice of Extension of Comment Period | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Comment Period EIS-0374: Notice of Extension of Comment Period Klondike IIIBiglow Canyon Wind Integration Project This notice extends the close of comment for scoping from the...

  6. Survey of lands held for uranium exploration, development, and production in fourteen western states in the six-month period ending June 30, 1980

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    The statistics set forth for the period covered in this report are based on data gathered from records available to the public. The county records of mining claim locations, reports of state and federal land offices, and commercial reporting services furnish the data for this report. Accordingly, if any fee land has been acquired in a private transaction not entered into a public record or report, that land transaction will not be accounted for in this report. Manpower is not available to survey, acquire, and evaluate data from each available source in each reporting period. Therefore, in any given report, the figures quoted for one or more land categories in a given state may be identical to the figures shown in earlier reports even though some changes probably have occurred. Such changes will be shown on subsequent reports. The figures used for acreage controlled at the beginning of the calendar year are those published for that date in Statistical Data of the Uranium Industry GJ0-100 published and distributed by the Grand Junction Office of the Department of Energy.

  7. PULSATION PERIOD VARIATIONS IN THE RRc LYRAE STAR KIC 5520878

    SciTech Connect (OSTI)

    Hippke, Michael; Learned, John G.; Zee, A.; Edmondson, William H.; Lindner, John F.; Kia, Behnam; Ditto, William L.; Stevens, Ian R. E-mail: jgl@phys.hawaii.edu E-mail: w.h.edmondson@bham.ac.uk E-mail: wditto@hawaii.edu E-mail: irs@star.sr.bham.ac.uk

    2015-01-01

    Learned et al. proposed that a sufficiently advanced extra-terrestrial civilization may tickle Cepheid and RR Lyrae variable stars with a neutrino beam at the right time, thus causing them to trigger early and jogging the otherwise very regular phase of their expansion and contraction. This would turn these stars into beacons to transmit information throughout the galaxy and beyond. The idea is to search for signs of phase modulation (in the regime of short pulse duration) and patterns, which could be indicative of intentional, omnidirectional signaling. We have performed such a search among variable stars using photometric data from the Kepler space telescope. In the RRc Lyrae star KIC 5520878, we have found two such regimes of long and short pulse durations. The sequence of period lengths, expressed as time series data, is strongly autocorrelated, with correlation coefficients of prime numbers being significantly higher (p = 99.8%). Our analysis of this candidate star shows that the prime number oddity originates from two simultaneous pulsation periods and is likely of natural origin. Simple physical models elucidate the frequency content and asymmetries of the KIC 5520878 light curve. Despite this SETI null result, we encourage testing of other archival and future time-series photometry for signs of modulated stars. This can be done as a by-product to the standard analysis, and can even be partly automated.

  8. Instrumentation to Monitor Transient Developing Periodic Flow in Newtonian Slurries

    SciTech Connect (OSTI)

    Bamberger, Judith A.; Enderlin, Carl W.

    2014-08-03

    This paper describes measurement techniques developed and applied to characterize solids mobilization and mixing of Newtonian slurries that are subjected to transient, periodic, developing flows. Metrics to characterize mobilization and mixing are the just suspended velocity (UJS) and the cloud height (HC). Two ultrasonic instruments to characterize pulse jet mixing of slurries were developed and deployed to measure related metrics: the thickness of the settled bed (used to determine mobilization) and the concentration within the cloud as a function of elevation [C(Z)]. A second method, continuous sample extraction, characterization, and reinsertion was successfully used to measure average density and characterize the concentration within the cloud. Testing focused on mixing vessels using intermitent jet mixers oriented vertically downward. Descriptions of the instruments and instrument performance are presented. These techniques were an effective approach to characterize mixing phenomena, determine mixing energy required to fully mobilize vessel contents, and to determine mixing times for process evaluation.

  9. Contractor: Contract Number: Contract Type: Total Estimated

    Office of Environmental Management (EM)

    Contract Number: Contract Type: Total Estimated Contract Cost: Performance Period Total Fee Paid FY2004 $294,316 FY2005 $820,074 FY2006 $799,449 FY2007 $877,898 FY2008 $866,608 FY2009 $886,404 FY2010 $800,314 FY2011 $871,280 FY2012 $824,517 FY2013 Cumulative Fee Paid $7,040,860 $820,074 $799,449 $877,898 $916,130 $886,608 Computer Sciences Corporation DE-AC06-04RL14383 $895,358 $899,230 $907,583 Cost Plus Award Fee $134,100,336 $8,221,404 Fee Available Contract Period: Fee Information Minimum

  10. Contractor Performance Assessment Reporting System (CPARS)

    Broader source: Energy.gov [DOE]

    The CPAR assesses a contractor’s performance, both positive and negative, and provides a record on a given contract during a specified period of time. Each assessment must be based on objective...

  11. PARC Periodical | Volume 7, Issue 2 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center 2 December 7, 2015 PARC Periodical | Volume 7, Issue 2 VIEW ARTICLE HERE

  12. EIS-0463: Extension of Scoping Period | Department of Energy

    Office of Environmental Management (EM)

    Extension of Scoping Period EIS-0463: Extension of Scoping Period Presidential Permit Application for Northern Pass Transmission, New Hampshire The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). In anticipation of additional alternative route information being provided by Northern Pass, DOE is reopening the scoping period. DOE will determine the close of the scoping period

  13. Department of Energy Extends Comment Period on Proposed Revisions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extends Comment Period on Proposed Revisions to its NEPA Rules Department of Energy Extends Comment Period on Proposed Revisions to its NEPA Rules February 17, 2011 - 5:29pm ...

  14. Property:Building/StartPeriod | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search This is a property of type Date. Start of the period (first day o the month) Pages using the property "BuildingStartPeriod" Showing 25 pages using this...

  15. Property:Wave Period Range(s) | Open Energy Information

    Open Energy Info (EERE)

    Property Edit with form History Property:Wave Period Range(s) Jump to: navigation, search Property Name Wave Period Range(s) Property Type String Pages using the property "Wave...

  16. Photovoltaic System Performance

    Energy Science and Technology Software Center (OSTI)

    1989-09-25

    PVFORM4.0 is used to design a photovoltaic (PV) system using a set of design parameters which optimize the system's economic potential for the proposed location and the expected operating conditions. PVFORM3.3 has been used to determine PV system size and optimum mounting configuration. The anticipated electrical load determines the system size and the weather and the mounting configuration affect the system output. PVFORM4.0 uses program-supplied default values or their user-supplied equivalents for each of amore » large number of parameters describing the system and time-series data describing the environment to perform a series of hourly calculations to simulate the physical (photovoltaic) performance of a PV system for a one-year period. These iterative calculations sample the performance of the PV system throughout a simulated 365-day year of system operation. Within any simulated day on which system performance is sampled, the calculations are done hourly. The number of days sampled and the interval between them is determined by an input parameter. The results of these calculations are summarized on a monthly basis in output tables and an optional plot file. The program is applicable to grid interactive or stand-alone flat-plate systems. The grid interactive system is assumed to use power purchased from a local utility to supply that portion of the load not met by the simulated PV array. If the array produces more energy than can be consumed by the load, the excess energy is assumed to be sold back to the utility at a constant energy sellback price. If a stand-alone system is being modeled, the program assumes that all energy produced by the simulated PV array is first applied to the external load, and any excess is then used to charge the battery bank. Energy not consumed by the load or the batteries is considered to be wasted.« less

  17. PARC Periodical | Volume 6, Issue 5 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center Volume 6, Issue 5 June 3, 2015 PARC Periodical | Volume 6, Issue 5 VIEW ARTICLE HERE

  18. PARC Periodical | Volume 6, Issue 6 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center Volume 6, Issue 6 August 20, 2015 PARC Periodical | Volume 6, Issue 6 VIEW ARTICLE HERE

  19. PARC Periodical | Volume 7, Issue 1 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center 1 October 12, 2015 PARC Periodical | Volume 7, Issue 1 VIEW ARTICLE HERE News/Media

  20. EIS-0463: Reopening of Scoping Period for the Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy Reopening of Scoping Period for the Environmental Impact Statement EIS-0463: Reopening of Scoping Period for the Environmental Impact Statement Northern Pass Transmission Line Project The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). The scoping period now ends on June 14, 2011. For more information see the project page at:

  1. A new performance evaluation tool

    SciTech Connect (OSTI)

    Kindl, F.H.

    1996-12-31

    The paper describes a Steam Cycle Diagnostic Program (SCDP), that has been specifically designed to respond to the increasing need of electric power generators for periodic performance monitoring, and quick identification of the causes for any observed increase in fuel consumption. There is a description of program objectives, modeling and test data inputs, results, underlying program logic, validation of program accuracy by comparison with acceptance test quality data, and examples of program usage.

  2. BUSINESS SENSITIVE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BUSINESS SENSITIVE Department of Energy Washington, DC 20585 Mr. Dwayne Wilson, President & CEO , Savannah River Nuclear Solutions, LLC Savannah River Site Building 730-1B, Room 333 Aiken, SC 29808 Dear Mr. Wilson: SUBJECT: Final Fee Determination for Fiscal Year (FY) 2012 Base Work Performance Period The purpose of this letter is to inform you of my determination of performance fee to be awarded to Savannah River Nuclear Solutions, LLC (SRNS) for FY 2012, in accordance with Contract No.

  3. Performance Engineering Research Center and RECOVERY. Performance

    Office of Scientific and Technical Information (OSTI)

    Engineering Research Institution SciDAC-e Augmentation. Performance enhancement (Technical Report) | SciTech Connect Performance Engineering Research Center and RECOVERY. Performance Engineering Research Institution SciDAC-e Augmentation. Performance enhancement Citation Details In-Document Search Title: Performance Engineering Research Center and RECOVERY. Performance Engineering Research Institution SciDAC-e Augmentation. Performance enhancement This project concentrated on various ways to

  4. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Maximum Fee Performance Period Fee Available Fee Earned FY2009 $18,417,000 $17,667,000 FY2010 $28,613,905 $28,141,405 FY2011 $33,334,089 $33,300,000 FY2012 $23,507,000 $23,078,500 FY2013 $20,894,699 $19,073,701 FY2014 $25,073,192 $21,887,968 FY2015 $30,000,000 $28,182,000 FY2016 $22,421,038 Cumulative Fee $202,260,923 $171,330,574 $0 EM Contractor Fee Office of River Protection - Richland, WA Tank Operations Contract December 2015 $202,260,923 October 1, 2008 - September 30, 2013 Washington

  5. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Available Fee Earned FY2010-A $811,313 $685,560 FY2010-B $811,313 $687,588 FY2011-A $747,788 $601,221 FY2011-B $1,281,021 $1,208,003 FY2012-A $613,324 $502,926 FY2012-B $693,521 $618,967 FY2013-A $795,968 $585,435 FY2013-B $795,968 $614,885 FY2014-A $592,117 $405,601 FY2014-B $53,178 $33,762 FY2015-A $729,174 $729,174 FY2015-B $1,094,694 $1,094,694 FY2016A $527,978 $527,978 Cumulative Fee $9,547,357 $8,295,794 $9,547,357 Wastren Advantage Inc. DE-EM0000323

  6. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Performance and Optimization Performance Monitoring Last edited: 2012-01-09 12:31:03

  7. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Performance and Optimization Performance Monitoring Last edited: 2012-01-09 12:31:03...

  8. Performance model assessment for multi-junction concentrating photovoltaic systems.

    SciTech Connect (OSTI)

    Riley, Daniel M.; McConnell, Robert.; Sahm, Aaron; Crawford, Clark; King, David L.; Cameron, Christopher P.; Foresi, James S.

    2010-03-01

    Four approaches to modeling multi-junction concentrating photovoltaic system performance are assessed by comparing modeled performance to measured performance. Measured weather, irradiance, and system performance data were collected on two systems over a one month period. Residual analysis is used to assess the models and to identify opportunities for model improvement.

  9. PARC Periodical-Volume 5, Issue 6 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Periodical-Volume 5, Issue 6 August 12, 2014 PARC Periodical-Volume 5, Issue 6 View the Periodical here

  10. Recommendation 186: Option Periods in Prime Contract Language | Department

    Office of Environmental Management (EM)

    of Energy 6: Option Periods in Prime Contract Language Recommendation 186: Option Periods in Prime Contract Language ORSSAB recommends the inclusion of option periods in the language of all future DOE Request for Proposals for prime contracts when appropriate. PDF icon Recommendation 186 PDF icon DOE response to recommendation 186 More Documents & Publications EM SSAB Recommendations and Letters - 2010-01 EM SSAB Recommendations and Letters - 2010-02 Recommendation 194: 2012 Budget

  11. EIS-0489: Notice of Comment Period Extension and Additional Scoping

    Office of Environmental Management (EM)

    Meetings | Department of Energy Comment Period Extension and Additional Scoping Meetings EIS-0489: Notice of Comment Period Extension and Additional Scoping Meetings Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR) FERC announces the extension of the public comment periond and additional scoping meetings. The comment period has been extended from September 4, 2012 to October 29, 2012. For more

  12. Demonstration of sawtooth period control with EC waves in KSTAR plasma

    SciTech Connect (OSTI)

    Jeong, J. H.; Bae, Y. S.; Joung, M.; Kim, D.; Goodman, T. P.; Sauter, O.; Sakamoto, K.; Kajiwara, K.; Oda, Y.; Kwak, J. G.; Namkung, W.; Cho, M. H.; Park, H.; Hosea, J.; Ellis, R.

    2015-03-12

    The sawtooth period control in tokamak is important issue in recent years because the sawtooth crash can trigger TM/NTM instabilities and drive plasmas unstable. The control of sawtooth period by the modification of local current profile near the q=1 surface using ECCD has been demonstrated in a number of tokamaks [1, 2] including KSTAR. As a result, developing techniques to control the sawtooth period as a way of controlling the onset of NTM has been an important area of research in recent years [3]. In 2012 KSTAR plasma campaign, the sawtooth period control is carried out by the different deposition position of EC waves across the q=1 surface. The sawtooth period is shortened by on-axis co-ECCD (destabilization), and the stabilization of the sawtooth is also observed by off-axis co-ECCD at outside q=1 surface. In 2013 KSTAR plasma campaign, the sawtooth locking experiment with periodic forcing of 170 GHz EC wave is carried out to control the sawtooth period. The optimal target position which lengthens the sawtooth period is investigated by performing a scan of EC beam deposition position nearby q=1 surface at the toroidal magnetic field of 2.9 T and plasma current of 0.7 MA. The sawtooth locking by the modulated EC beam is successfully demonstrated as in [3-5] with the scan of modulation-frequency and duty-ratio at the low beta (?N~0.5) plasma. In this paper, the sawteeth behavior by the location of EC beam and the preliminary result of the sawtooth locking experiments in KSTAR will be presented.

  13. Demonstration of sawtooth period control with EC waves in KSTAR plasma

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Jeong, J. H.; Bae, Y. S.; Joung, M.; Kim, D.; Goodman, T. P.; Sauter, O.; Sakamoto, K.; Kajiwara, K.; Oda, Y.; Kwak, J. G.; et al

    2015-03-12

    The sawtooth period control in tokamak is important issue in recent years because the sawtooth crash can trigger TM/NTM instabilities and drive plasmas unstable. The control of sawtooth period by the modification of local current profile near the q=1 surface using ECCD has been demonstrated in a number of tokamaks [1, 2] including KSTAR. As a result, developing techniques to control the sawtooth period as a way of controlling the onset of NTM has been an important area of research in recent years [3]. In 2012 KSTAR plasma campaign, the sawtooth period control is carried out by the different depositionmore » position of EC waves across the q=1 surface. The sawtooth period is shortened by on-axis co-ECCD (destabilization), and the stabilization of the sawtooth is also observed by off-axis co-ECCD at outside q=1 surface. In 2013 KSTAR plasma campaign, the sawtooth locking experiment with periodic forcing of 170 GHz EC wave is carried out to control the sawtooth period. The optimal target position which lengthens the sawtooth period is investigated by performing a scan of EC beam deposition position nearby q=1 surface at the toroidal magnetic field of 2.9 T and plasma current of 0.7 MA. The sawtooth locking by the modulated EC beam is successfully demonstrated as in [3-5] with the scan of modulation-frequency and duty-ratio at the low beta (βN~0.5) plasma. In this paper, the sawteeth behavior by the location of EC beam and the preliminary result of the sawtooth locking experiments in KSTAR will be presented.« less

  14. CEQ Extends Comment Period on Revised Draft Guidance on Consideration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in NEPA Reviews CEQ Extends Comment Period on Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews February 20, ...

  15. Guidance on the Required Period for Grantees to Obligate Funds...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on the Required Period for Grantees to Obligate Funds and the Procedures for Reporting of Obligated Funds for the Energy Efficiency Conservation Block Grant (EECBG) Program...

  16. Notice of Extension of Public Comment Period for Application...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension of Public Comment Period for Application for Proposed Project for Clean Line Plains & Eastern Transmission Line: Federal Register Notice, Volume 80, No. 116 - Jun. 17, ...

  17. Extension of Comment Period on the Draft Integrated, Interagency...

    Energy Savers [EERE]

    of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations Extension of Comment...

  18. High Pressure Fuel Storage Cylinders Periodic Inspection and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Storage Cylinders Periodic Inspection and End of Life Issues High Pressure Fuel ... Lessons Learned from Practical Field Experience with High Pressure Gaseous Fuels The ...

  19. EIS-0403: Notice to Extend Public Comment Period | Department...

    Broader source: Energy.gov (indexed) [DOE]

    States The Department of Energy and the Bureau of Land Management (BLM) (the Agencies) extended the public comment period for the Programmatic Environmental Impact Statement to...

  20. EIS-0431: Extension of public comment period; Notice of public...

    Energy Savers [EERE]

    EIS-0431: Extension of public comment period; Notice of public hearing (Correction) Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and...

  1. "Period","Annual Production Capacity",,"Monthly B100 Production...

    U.S. Energy Information Administration (EIA) Indexed Site

    Biodiesel production capacity and production" "million gallons" "Period","Annual ... is the industry designation for pure biodiesel; a biodiesel blend contains both pure ...

  2. EIS-0391: Extension of the Public Comment Period | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Tank Closure and Waste Management for the Hanford Site, Richland, WA Extension of the Public Comment Period for the Draft Tank Closure and Waste Management Environmental Impact...

  3. Period-doubling reconstructions of semiconductor partial dislocations

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Park, Ji -Sang; Huang, Bing; Wei, Su -Huai; Kang, Joongoo; McMahon, William E.

    2015-09-18

    Atomic-scale understanding and control of dislocation cores is of great technological importance, because they act as recombination centers for charge carriers in optoelectronic devices. Using hybrid density-functional calculations, we present period-doubling reconstructions of a 90° partial dislocation in GaAs, for which the periodicity of like-atom dimers along the dislocation line varies from one to two, to four dimers. The electronic properties of a dislocation change drastically with each period doubling. The dimers in the single-period dislocation are able to interact, to form a dispersive one-dimensional band with deep-gap states. However, the inter-dimer interaction for the double-period dislocation becomes significantly reduced;more » hence, it is free of mid-gap states. The Ga core undergoes a further period-doubling transition to a quadruple-period reconstruction induced by the formation of small hole polarons. Lastly, the competition between these dislocation phases suggests a new passivation strategy via population manipulation of the detrimental single-period phase.« less

  4. Quantum coherent switch utilizing commensurate nanoelectrode and charge density periodicities

    DOE Patents [OSTI]

    Harrison; Neil , Singleton; John , Migliori; Albert

    2008-08-05

    A quantum coherent switch having a substrate formed from a density wave (DW) material capable of having a periodic electron density modulation or spin density modulation, a dielectric layer formed onto a surface of the substrate that is orthogonal to an intrinsic wave vector of the DW material; and structure for applying an external spatially periodic electrostatic potential over the dielectric layer.

  5. Math Library Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Math Library Performance Math Library Performance Fully optimizing a given application's performance often requires a deep understanding of the source, an accurate profile for a ...

  6. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance and Optimization Performance and Optimization Benchmarking Software on Hopper and Carver PURPOSE Test the performance impact of multithreading with representative...

  7. MONTE CARLO SIMULATIONS OF PERIODIC PULSED REACTOR WITH MOVING GEOMETRY PARTS

    SciTech Connect (OSTI)

    Cao, Yan; Gohar, Yousry

    2015-11-01

    In a periodic pulsed reactor, the reactor state varies periodically from slightly subcritical to slightly prompt supercritical for producing periodic power pulses. Such periodic state change is accomplished by a periodic movement of specific reactor parts, such as control rods or reflector sections. The analysis of such reactor is difficult to perform with the current reactor physics computer programs. Based on past experience, the utilization of the point kinetics approximations gives considerable errors in predicting the magnitude and the shape of the power pulse if the reactor has significantly different neutron life times in different zones. To accurately simulate the dynamics of this type of reactor, a Monte Carlo procedure using the transfer function TRCL/TR of the MCNP/MCNPX computer programs is utilized to model the movable reactor parts. In this paper, two algorithms simulating the geometry part movements during a neutron history tracking have been developed. Several test cases have been developed to evaluate these procedures. The numerical test cases have shown that the developed algorithms can be utilized to simulate the reactor dynamics with movable geometry parts.

  8. Department of Energy Extends Public Comment Period | Department of Energy

    Office of Environmental Management (EM)

    Extends Public Comment Period Department of Energy Extends Public Comment Period September 29, 2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 In response to public comments and requests, the U.S. Department of Energy National Nuclear Security Administration Nevada Site Office is extending the public comment period for the Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security

  9. Property:Building/MeanAnnualTempCalculationPeriod | Open Energy...

    Open Energy Info (EERE)

    Property Edit with form History Property:BuildingMeanAnnualTempCalculationPeriod Jump to: navigation, search This is a property of type Number. Mean annual temperature during the...

  10. Progress report for the period October 1981-September 1982

    SciTech Connect (OSTI)

    Not Available

    1983-02-01

    The mission-related activities of the DOE New Brunswick Laboratory involving development, calibration, and evaluation of nuclear material measurement technology and providing measurement-related services for the Government during the period are described and summarized.

  11. Linear Scaling Electronic Structure Methods with Periodic Boundary Conditions

    SciTech Connect (OSTI)

    Gustavo E. Scuseria

    2008-02-08

    The methodological development and computational implementation of linear scaling quantum chemistry methods for the accurate calculation of electronic structure and properties of periodic systems (solids, surfaces, and polymers) and their application to chemical problems of DOE relevance.

  12. Method for improving fuel cell performance

    DOE Patents [OSTI]

    Uribe, Francisco A.; Zawodzinski, Thomas

    2003-10-21

    A method is provided for operating a fuel cell at high voltage for sustained periods of time. The cathode is switched to an output load effective to reduce the cell voltage at a pulse width effective to reverse performance degradation from OH adsorption onto cathode catalyst surfaces. The voltage is stepped to a value of less than about 0.6 V to obtain the improved and sustained performance.

  13. ARM Intensive Operational Period Scheduled to Validate New NASA Satellite

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 ARM Intensive Operational Period Scheduled to Validate New NASA Satellite Beginning in July, all three ARM sites (Southern Great Plains [SGP], North Slope of Alaska, and Tropical Western Pacific; Figure 1) will participate in the AIRS Validation IOP. This three-month intensive operational period (IOP) will validate data collected by the satellite-based Atmospheric Infrared Sounder (AIRS) recently launched into space. On May 4, the National Aeronautics and Space Administration (NASA) launched

  14. DOE Extends Public Comment Period for Uranium Program Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy Uranium Program Environmental Impact Statement DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement April 18, 2013 - 1:08pm Addthis Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs, (720) 377-9672, ULinfo@lm.doe.gov GRAND JUNCTION, Colo. - The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS)

  15. Extension of Comment Period on the Draft Integrated, Interagency

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations | Department of Energy Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations September 25, 2013 - 4:24pm Addthis On August 29,

  16. Department of Energy Announces Plans for Additional Comment Period on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Interest Electric Transmission Corridors | Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors November 9, 2006 - 9:38am Addthis Under Section 1221(a) of the Energy Policy Act of 2005, the Department of Energy must issue a report based on the Department's August 8 Congestion Study. In that report,

  17. Emissions from Idling Trucks for Extended Time Periods | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Idling Trucks for Extended Time Periods Emissions from Idling Trucks for Extended Time Periods 2002 DEER Conference Presentation: Oak Ridge National Laboratory PDF icon 2002_deer_lewis.pdf More Documents & Publications 21st Century Truck Partnership - Roadmap and Technical White Papers Appendix of Supporting Information - 21CTP-0003, December 2006 Technical Demonstration of 2010 Emissions Regulations over Transient Operation 21st Century Truck Partnership Roadmap Roadmap and

  18. Notice of extension of public comment period for reply comments. |

    Energy Savers [EERE]

    Department of Energy extension of public comment period for reply comments. Notice of extension of public comment period for reply comments. On July 27, 2010, the Department of Energy (DOE) published in the Federal Register a notice of inquiry (NOI) and request for comment from the public in its development of regulations pertaining to section 934, of the Energy Independence and Security Act of 2007 (''Act''). Section 934 addresses how the United States will meet its obligations under the

  19. WASP-19b: THE SHORTEST PERIOD TRANSITING EXOPLANET YET DISCOVERED

    SciTech Connect (OSTI)

    Hebb, L.; Collier-Cameron, A.; Enoch, B.; Horne, K.; Triaud, A.H.M.J.; Gillon, M.; Queloz, D.; Mayor, M.; Pepe, F.; Segransan, D.; Lister, T.A.; Smalley, B.; Maxted, P.F.L.; Hellier, C.; Anderson, D.R.; Bentley, S.; Pollacco, D.; West, R.G.; Haswell, C.A.; Skillen, I.

    2010-01-01

    We report on the discovery of a new extremely short period transiting extrasolar planet, WASP-19b. The planet has mass M{sub pl} = 1.15 +- 0.08 M{sub J} , radius R{sub pl} = 1.31 +- 0.06 R{sub J} , and orbital period P = 0.7888399 +- 0.0000008 days. Through spectroscopic analysis, we determine the host star to be a slightly super-solar metallicity ([M/H] = 0.1 +- 0.1 dex) G-dwarf with T{sub eff} = 5500 +- 100 K. In addition, we detect periodic, sinusoidal flux variations in the light curve which are used to derive a rotation period for the star of P{sub rot} = 10.5 +- 0.2 days. The relatively short stellar rotation period suggests that either WASP-19 is somewhat young (approx 600 Myr old) or tidal interactions between the two bodies have caused the planet to spiral inward over its lifetime resulting in the spin-up of the star. Due to the detection of the rotation period, this system has the potential to place strong constraints on the stellar tidal quality factor, Q'{sub s}, if a more precise age is determined.

  20. Presidential Performance Contracting Challenge: Performance Toward...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    091515 President's Performance Contracting Challenge Status (September 15, 2015) Pipeline: Amount of project costs in procurement process and expected to award. Awarded:...

  1. Presidential Performance Contracting Challenge: Performance Toward...

    Broader source: Energy.gov (indexed) [DOE]

    Presidential Performance Contracting Challenge Status graphic. May 9, 2014, the president announced an additional 2 billion goal in federal energy-efficiency upgrades to federal...

  2. Writing Performance Objectives

    Broader source: Energy.gov [DOE]

    Couse Description: This course provides the opportunity for supervisors and managers to write performance objectives or performance standards based on the department’s performance management system.

  3. Distributed performance counters

    DOE Patents [OSTI]

    Davis, Kristan D; Evans, Kahn C; Gara, Alan; Satterfield, David L

    2013-11-26

    A plurality of first performance counter modules is coupled to a plurality of processing cores. The plurality of first performance counter modules is operable to collect performance data associated with the plurality of processing cores respectively. A plurality of second performance counter modules are coupled to a plurality of L2 cache units, and the plurality of second performance counter modules are operable to collect performance data associated with the plurality of L2 cache units respectively. A central performance counter module may be operable to coordinate counter data from the plurality of first performance counter modules and the plurality of second performance modules, the a central performance counter module, the plurality of first performance counter modules, and the plurality of second performance counter modules connected by a daisy chain connection.

  4. Audit Report: Department of Energy's Controls over Recovery Act...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... a portion of the incentive fee, while still providing fair compensation to the contractor. ... contract; 2. Renegotiate performance incentives fees using current cost and pricing ...

  5. Time-periodic solutions of the Benjamin-Ono equation

    SciTech Connect (OSTI)

    Ambrose , D.M.; Wilkening, Jon

    2008-04-01

    We present a spectrally accurate numerical method for finding non-trivial time-periodic solutions of non-linear partial differential equations. The method is based on minimizing a functional (of the initial condition and the period) that is positive unless the solution is periodic, in which case it is zero. We solve an adjoint PDE to compute the gradient of this functional with respect to the initial condition. We include additional terms in the functional to specify the free parameters, which, in the case of the Benjamin-Ono equation, are the mean, a spatial phase, a temporal phase and the real part of one of the Fourier modes at t = 0. We use our method to study global paths of non-trivial time-periodic solutions connecting stationary and traveling waves of the Benjamin-Ono equation. As a starting guess for each path, we compute periodic solutions of the linearized problem by solving an infinite dimensional eigenvalue problem in closed form. We then use our numerical method to continue these solutions beyond the realm of linear theory until another traveling wave is reached (or until the solution blows up). By experimentation with data fitting, we identify the analytical form of the solutions on the path connecting the one-hump stationary solution to the two-hump traveling wave. We then derive exact formulas for these solutions by explicitly solving the system of ODE's governing the evolution of solitons using the ansatz suggested by the numerical simulations.

  6. High Performance Computing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HPC INL Logo Home High-Performance Computing INL's high-performance computing center provides general use scientific computing capabilities to support the lab's efforts in advanced...

  7. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    application runtimes vs node placement. Read More Hopper Performance Monitoring Benchmarking performance of scientific applications on Hopper Read More Hopper:Improving IO...

  8. Performance Analysis with Vampir

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (frank.winkler@tu-dresden.de) Performance Analysis with Vampir Disclaimer Performance tools will not automatically make you code run faster. They help you understand, what your...

  9. EIS-0236-S4: Extension of Comment Period | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension of Comment Period EIS-0236-S4: Extension of Comment Period Complex Transformation Extension of Comment Period for the Draft Complex Transformation Supplemental...

  10. National Weatherization Assistance Program Characterization Describing the Recovery Act Period

    SciTech Connect (OSTI)

    Tonn, Bruce Edward; Rose, Erin M.; Hawkins, Beth A.

    2015-10-01

    This report characterizes the U.S. Department of Energy s Weatherization Assistance Program (WAP) during the American Recovery and Reinvestment Act of 2009 (Recovery Act) period. This research was one component of the Recovery Act evaluation of WAP. The report presents the results of surveys administered to Grantees (i.e., state weatherization offices) and Subgrantees (i.e., local weatherization agencies). The report also documents the ramp up and ramp down of weatherization production and direct employment during the Recovery Act period and other challenges faced by the Grantees and Subgrantees during this period. Program operations during the Recovery Act (Program Year 2010) are compared to operations during the year previous to the Recovery Act (Program Year 2008).

  11. DOE/IG Annual Performance Report FY 2008, Annual Performance...

    Energy Savers [EERE]

    DOEIG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOEIG Annual Performance Report FY 2008, Annual Performance Plan FY 2009 DOEIG Annual Performance Report...

  12. Sleeper Cab Climate Control Load Reduction for Long-Haul Truck Rest Period Idling

    SciTech Connect (OSTI)

    Lustbader, J. A.; Kreutzer, C.; Adelman, S.; Yeakel, S.; Zehme, J.

    2015-04-29

    Annual fuel use for long-haul truck rest period idling is estimated at 667 million gallons in the United States. The U.S. Department of Energy’s National Renewable Energy Laboratory’s CoolCab project aims to reduce heating, ventilating, and air conditioning (HVAC) loads and resulting fuel use from rest period idling by working closely with industry to design efficient long-haul truck climate control systems while maintaining occupant comfort. Enhancing the thermal performance of cab/sleepers will enable smaller, lighter, and more cost-effective idle reduction solutions. In order for candidate idle reduction technologies to be implemented at the original equipment manufacturer and fleet level, their effectiveness must be quantified. To address this need, a number of promising candidate technologies were evaluated through experimentation and modeling to determine their effectiveness in reducing rest period HVAC loads. For this study, load reduction strategies were grouped into the focus areas of solar envelope, occupant environment, and conductive pathways. The technologies selected for a complete-cab package of technologies were “ultra-white” paint, advanced insulation, and advanced curtains. To measure the impact of these technologies, a nationally-averaged solar-weighted reflectivity long-haul truck paint color was determined and applied to the baseline test vehicle. Using the complete-cab package of technologies, electrical energy consumption for long-haul truck daytime rest period air conditioning was reduced by at least 35% for summer weather conditions in Colorado. The National Renewable Energy Laboratory's CoolCalc model was then used to extrapolate the performance of the thermal load reduction technologies nationally for 161 major U.S. cities using typical weather conditions for each location over an entire year.

  13. Math Library Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Math Library Performance Math Library Performance Fully optimizing a given application's performance often requires a deep understanding of the source, an accurate profile for a representative run, and the ability to have changes to the source accepted upstream. However, in many cases, significant performance gains can be achieved by simply optimizing the code over the matrix of possible compilers, compiler options and libraries available on a given machine. Here, we explore the performance

  14. Some Thoughts on Stability in Nonlinear Periodic Focusing Systems

    DOE R&D Accomplishments [OSTI]

    McMillan, E. M.

    1967-09-05

    A brief discussion is given of the long-term stability of particle motions through periodic focusing structures containing lumped nonlinear elements. A method is presented whereby one can specify the nonlinear elements in such a way as to generate a variety of structures in which the motion has long-term stability.

  15. 4Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2006. Data for these indicators are gathered by Field...

  16. 1Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January to March 2007. Data for these indicators are gathered by Field elements...

  17. 4Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2005. Data for these indicators are gathered by Field...

  18. 2Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2005. Data for these indicators are gathered by Field elements...

  19. 3Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2005. Data for these indicators are gathered by Field...

  20. 1Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January to March 2005. Data for these indicators are gathered by Field elements...

  1. 3Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2006. Data for these indicators are gathered by Field...

  2. 2Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2006. Data for these indicators are gathered by Field elements...

  3. 4Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "Attached is the Facility Representative (FR) Program Performance Indicators QuarterlyReport covering the period from October to December 2007. Data for these indicators aregathered by Field...

  4. 4Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2008. Data for these indicators are gathered by Field...

  5. 2Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April through June 2012. Data for these indicators were...

  6. 1Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from January to March 2001. Data for these indicators are gathered by the Field...

  7. 1Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January through March 2012. Data for these indicators were...

  8. 4Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October through December 2011. Data for these indicators were...

  9. 3Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2007. Data for these indicators are gathered by Field...

  10. 3Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the Period July  through September 2011. Data for these indicators were gathered...

  11. 4Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "This memorandum summarizes the highlights of the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period October through December 2010. Data for these...

  12. 3Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    This memorandum summarizes the highlights of the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period of July through September 2010. Data for these...

  13. 4Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative Program Performance Indicators (Pis) Quarterly Report Covering the Period from October to December 2002. Data for these indicators are gathered by Field...

  14. 2Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators QuarterlyReport covering the period from April to June 2008. Data for these indicators aregathered by Field elements...

  15. 1Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the Period January through March 2011. Data for these indicators were gathered...

  16. 3Q CY2001 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from July to September 2001. Data for these indicators are gathered by the Field...

  17. 2Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2007. Data for these indicators are gathered by field elements...

  18. 2Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report

    Broader source: Energy.gov [DOE]

    "This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period April through June 20 1 1. Data for these indicators were gathered...

  19. PARC Periodical-Volume 5, Issue 4 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Periodical-Volume 5, Issue 4 April 14, 2014 PARC Periodical-Volume 5, Issue 4 View Issue

  20. Enumeration of Salmonids in the Okanogan Basin Using Underwater Video, Performance Period: October 2005 (Project Inception) - 31 December 2006.

    SciTech Connect (OSTI)

    Johnson, Peter N.; Rayton, Michael D.; Nass, Bryan L.; Arterburn, John E.

    2007-06-01

    The Confederated Tribes of the Colville Reservation (Colville Tribes) identified the need for collecting baseline census data on the timing and abundance of adult salmonids in the Okanogan River Basin in order to determine basin and tributary-specific spawner distributions, evaluate the status and trends of natural salmonid production in the basin, document local fish populations, and augment existing fishery data. This report documents the design, installation, operation and evaluation of mainstem and tributary video systems in the Okanogan River Basin. The species-specific data collected by these fish enumeration systems are presented along with an evaluation of the operation of a facility that provides a count of fish using an automated method. Information collected by the Colville Tribes Fish & Wildlife Department, specifically the Okanogan Basin Monitoring and Evaluation Program (OBMEP), is intended to provide a relative abundance indicator for anadromous fish runs migrating past Zosel Dam and is not intended as an absolute census count. Okanogan Basin Monitoring and Evaluation Program collected fish passage data between October 2005 and December 2006. Video counting stations were deployed and data were collected at two locations in the basin: on the mainstem Okanogan River at Zosel Dam near Oroville, Washington, and on Bonaparte Creek, a tributary to the Okanogan River, in the town of Tonasket, Washington. Counts at Zosel Dam between 10 October 2005 and 28 February 2006 are considered partial, pilot year data as they were obtained from the operation of a single video array on the west bank fishway, and covered only a portion of the steelhead migration. A complete description of the apparatus and methodology can be found in 'Fish Enumeration Using Underwater Video Imagery - Operational Protocol' (Nass 2007). At Zosel Dam, totals of 57 and 481 adult Chinook salmon were observed with the video monitoring system in 2005 and 2006, respectively. Run timing for Chinook in 2006 indicated that peak passage occurred in early October and daily peak passage was noted on 5 October when 52 fish passed the dam. Hourly passage estimates of Chinook salmon counts for 2005 and 2006 at Zosel Dam revealed a slight diel pattern as Chinook passage events tended to remain low from 1900 hours to 0600 hours relative to other hours of the day. Chinook salmon showed a slight preference for passing the dam through the video chutes on the east bank (52%) relative to the west bank (48%). A total of 48 adult sockeye salmon in 2005 and 19,245 in 2006 were counted passing through the video chutes at Zosel Dam. The 2006 run timing pattern was characterized by a large peak in passage from 3 August through 10 August when 17,698 fish (92% of total run observed for the year) were observed passing through the video chutes. The daily peak of 5,853 fish occurred on 4 August. Hourly passage estimates of sockeye salmon counts for 2005 and 2006 at the dam showed a strong diel pattern with increased passage during nighttime hours relative to daytime hours. Sockeye showed a strong preference for passing Zosel Dam on the east bank (72%) relative to the west bank (28%). A total of 298 adult upstream-migrating steelhead were counted at Zosel Dam in 2005 and 2006, representing the 2006 cohort based on passage data from 5 October 2005 through 15 July 2006. Eighty-seven percent (87%) of the total steelhead observed passed the dam between 23 March and 25 April with a peak passage occurring on 6 April when 31 fish were observed. Steelhead passage at Zosel Dam exhibited no diel pattern. In contrast to both Chinook and sockeye salmon, steelhead were shown to have a preference for passing the dam on the west bank (71%) relative to the east bank (29%). Both Chinook and sockeye passage at Zosel Dam were influenced by Okanogan River water temperature. When water temperatures peaked in late July (daily mean exceeded 24 C and daily maximum exceeded 26.5 C), Chinook and sockeye counts went to zero. A subsequent decrease in water temperature resulted in sharp increases in both C

  1. Eelgrass Enhancement and Restoration in the Lower Columbia River Estuary, Period of Performance: Feb 2008-Sep 2009.

    SciTech Connect (OSTI)

    Judd, C.; Thom, R; Borde, A.

    2009-09-08

    The purpose of this study was to evaluate the ability to enhance distribution of eelgrass (Zostera marina) in the Columbia River Estuary to serve as refuge and feeding habitat for juvenile salmon, Dungeness crab, and other fish and wildlife. We strongly suspected that limited eelgrass seed dispersal has resulted in the present distribution of eelgrass meadows, and that there are other suitable places for eelgrass to survive and form functional meadows. Funded as part of the Bonneville Power Administration's call for Innovative Projects, we initiated a multistage study in 2008 that combined modeling, remote sensing, and field experimentation to: (1) Spatially predict habitat quality for eelgrass; (2) Conduct experimental plantings; and (3) Evaluate restoration potential. Baseline in-situ measurements and remote satellite observations were acquired for locations in the Lower Columbia River Estuary (LCRE) to determine ambient habitat conditions. These were used to create a habitat site-selection model, using data on salinity, temperature, current velocity, light availability, wave energy, and desiccation to predict the suitability of nearshore areas for eelgrass. Based on this model and observations in the field, five sites that contained no eelgrass but appeared to have suitable environmental conditions were transplanted with eelgrass in June 2008 to test the appropriateness of these sites for eelgrass growth. We returned one year after the initial planting to monitor the success rate of the transplants. During the year after transplanting, we carried out a concurrent study on crab distribution inside and outside eelgrass meadows to study crab usage of the habitat. One year after the initial transplant, two sites, one in Baker Bay and one in Young's Bay, had good survival or expansion rates with healthy eelgrass. Two sites had poor survival rates, and one site had a total loss of the transplanted eelgrass. For submerged aquatic vegetation (SAV) restoration projects, these are reasonable success results and represent a small net gain in eelgrass in the LCRE. Crabs used both the eelgrass and unvegetated substrate, though in neither were there great abundance of the young-of-the-year crabs. During the field assessment of 12 potential transplant sites, divers discovered one site in southern Young's Bay that contained a previously undocumented eelgrass bed. This integrated project developed the first predictive maps of sites suitable for eelgrass and other SAV in the lower estuary. In addition, techniques developed for this project to assess light levels in existing and potential submerged habitats have great potential to be used in other regions for nearshore and coastal monitoring of SAV. Based on these preliminary results, we conclude that eelgrass distribution could likely be expanded in the estuary, though additional information on current eelgrass locations, usage by species of interest, and monitoring of current conditions would help develop a baseline and verify benefit. Our recommendations for future studies include: (1) Site Monitoring. Continued monitoring of restoration sites along with physical metrics of light, temperature and salinity within beds. Continued monitoring will both assist managers in understanding the longevity and expansion rate of planted sites and inform practical guidance on the minimum planted eelgrass required to develop a resilient meadow. (2) Natural bed documentation and monitoring. Document current eelgrass habitat conditions in the Columbia River by mapping eelgrass and other SAV species and monitoring physical metrics in natural beds. This will assist by better defining the factors that control the annual and spatial variation in eelgrass in the estuary, and thus lead to improved management. Improved information on conditions will help refine a habitat suitability model that can more accurately predict where eelgrass can be restored or areas under duress. (3) Monitor Species Use. Expanded monitoring of Dungeness crab and salmon use and benefit from eelgrass in the estuary to evaluate how

  2. Renewable Energy in Water and Wastewater Treatment Applications; Period of Performance: April 1, 2001--September 1, 2001

    SciTech Connect (OSTI)

    Argaw, N.

    2003-06-01

    This guidebook will help readers understand where and how renewable energy technologies can be used for water and wastewater treatment applications. It is specifically designed for rural and small urban center water supply and wastewater treatment applications. This guidebook also provides basic information for selecting water resources and for various kinds of commercially available water supply and wastewater treatment technologies and power sources currently in the market.

  3. Polarization periodicity in the B1 columnar phase determined by resonant x-ray scattering

    SciTech Connect (OSTI)

    Folcia, C.L.; Pindak, R.; Ortega, J.; Etxebarria, J.; Pan, L.; Wang, S.; Huang, C.C.; Ponsinet, V.; Barois, P. and Gimeno, N.

    2011-07-14

    We report structural results that evidence the polarization distribution of the blocks in the columnar phase of an achiral bent-core liquid crystal. The study was performed using resonant x-ray diffraction at the sulfur K edge on oriented samples aligned on substrates. The extra periodicity is revealed through the violation of the systematic extinction rule of the structural symmetry group along the experimentally accessible diffraction direction. Further data obtained from the polarization analysis of a resonant reflection give information concerning the transition mechanism between B{sub 1} and B{sub 2} phases.

  4. Polarization Periodicity in the B(1) Columnar Phase Determined by Resonant X-ray Scattering

    SciTech Connect (OSTI)

    C Folcia; J Ortega; J Etxebarria; L Pan; S Wang; C Huang; V Ponsinet; P Barois; R Pindak; N Gimeno

    2011-12-31

    We report structural results that evidence the polarization distribution of the blocks in the columnar phase of an achiral bent-core liquid crystal. The study was performed using resonant x-ray diffraction at the sulfur K edge on oriented samples aligned on substrates. The extra periodicity is revealed through the violation of the systematic extinction rule of the structural symmetry group along the experimentally accessible diffraction direction. Further data obtained from the polarization analysis of a resonant reflection give information concerning the transition mechanism between B{sub 1} and B{sub 2} phases.

  5. H. R. 4662: a bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil and refined petroleum products. Introduced in the House of Representatives, Ninety-Ninth Congress, Second Session, April 22, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    A bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil and refined petroleum products was introduced and referred to the House Ways and Means Committee. The fee would apply to the first sale of crude or refined petroleum products following importation into the US and the first use. It exempts certain exports, but requires proof of eligibility for exemption. Sections of the bill outline procedures for determining prices and adjustments, the registration of affected parties, and penalties for non-compliance.

  6. Performance on Edison

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Edison Performance Performance on Edison October 10, 2013 Edison-system.pdf.jpg Thursday, Oct. 10, 2013 9:00 a.m. to 2:15 p.m. PDT Attendance: 121 (111 online, 10 local) Location...

  7. Quasi-periodic quantum dot arrays produced by electrochemical synthesis

    SciTech Connect (OSTI)

    Bandyopadhyay, S.; Miller, A.E.; Yue, D.F.; Banerjee, G.; Ricker, R.E.; Jones, S.; Eastman, J.A.; Baugher, E.; Chandrasekhar, M.

    1994-06-01

    We discuss a ``gentle`` electrochemical technique for fabricating quasi-periodic quantum dot arrays. The technique exploits a self-organizing phenomenon to produce quasi-periodic arrangement of dots and provides excellent control over dot size and interdot spacing. Unlike conventional nanolithography, it does not cause radiation damage to the structures during exposure to pattern delineating beams (e-beam, ion-beam or x-ray). Moreover, it does not require harsh processing steps like reactive ion etching, offers a minimum feature size of {approximately}40 {angstrom}, allows the fabrication of structures on nonplanar surfaces (e.g. spherical or cylindrical substrates), is amenable to mass production (millions of wafers can be processed simultaneously) and is potentially orders of magnitude cheaper than conventional nanofabrication. In this paper, we describe our initial results and show the promise of this technique for low-cost and high-yield nanosynthesis.

  8. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Performance and Optimization Compiler Comparisons Comparison of different compilers with different options on several benchmarks. Read More » Using OpenMP Effectively Performance implications and case studies of codes combining MPI and OpenMP Read More » Reordering MPI Ranks Reordering MPI ranks can result in improved application performance depending on the communication patterns of the application. Read More » Application Performance Variability on Hopper How an application is

  9. MONTICELLO PROJECTS FEDERAL FACILITIES AGREEMENT REPORT Report Period: January 1-

    Office of Legacy Management (LM)

    PROJECTS FEDERAL FACILITIES AGREEMENT REPORT Report Period: January 1- March 31, 2006 DOE Project Coordinator: Ray Plieness HIGHLIGHTS The Federal Facilities Agreement meeting was held February 21-22 in Salt Lake City, UT. Representatives from the U.S. Depattment of Energy (DOE), U.S. Environmental Protection Agency (EPA), Utah Department of Environmental Quality (UDEQ), and the DOE contractor attended. The schedule of work through the end of the fiscal year was determined. MSG-OUIII The scope

  10. Enforcement Policy Statement: Compliance Period for Regional Standards

    Office of Environmental Management (EM)

    Compliance Period for Regional Standards Applicable to Central Air Conditioners April 24, 2014 On June 27, 2011, the U.S. Department of Energy (DOE) published in the Federal Register a direct final rule (DFR) under the Energy Policy and Conservation Act (EPCA), 42 U.S.C. §§ 6291-6309, which set forth amended energy conservation standards for residential furnaces, central air conditioners, and heat pumps, including regional standards for different product types in indicated States. 76 FR 37408.

  11. Some Thoughts on Stability in Nonlinear Periodic Focusing Systems [Addendum

    DOE R&D Accomplishments [OSTI]

    McMillan, Edwin M.

    1968-03-29

    Addendum to September 5, 1967 report with the same title and with the abstract: A brief discussion is given of the long-term stability of particle motions through periodic focusing structures containing lumped nonlinear elements. A method is presented whereby one can specify the nonlinear elements in such a way as to generate a variety of structures in which the motion has long-term stability.

  12. IR DIAL performance modeling

    SciTech Connect (OSTI)

    Sharlemann, E.T.

    1994-07-01

    We are developing a DIAL performance model for CALIOPE at LLNL. The intent of the model is to provide quick and interactive parameter sensitivity calculations with immediate graphical output. A brief overview of the features of the performance model is given, along with an example of performance calculations for a non-CALIOPE application.

  13. Femtosecond laser-induced periodic surface structure on the Ti-based nanolayered thin films

    SciTech Connect (OSTI)

    Petrovi?, Suzana M.; Gakovi?, B.; Peruko, D.; Stratakis, E.; Department of Materials Science and Technology, University of Crete, 710 03 Heraklion, Crete ; Bogdanovi?-Radovi?, I.; ?ekada, M.; Fotakis, C.; Department of Physics, University of Crete, 714 09 Heraklion, Crete ; Jelenkovi?, B.

    2013-12-21

    Laser-induced periodic surface structures (LIPSSs) and chemical composition changes of Ti-based nanolayered thin films (Al/Ti, Ni/Ti) after femtosecond (fs) laser pulses action were studied. Irradiation is performed using linearly polarized Ti:Sapphire fs laser pulses of 40 fs pulse duration and 800 nm wavelength. The low spatial frequency LIPSS (LSFL), oriented perpendicular to the laser polarization with periods slightly lower than the irradiation wavelength, was typically formed at elevated laser fluences. On the contrary, high spatial frequency LIPSS (HSFL) with uniform period of 155 nm, parallel to the laser light polarization, appeared at low laser fluences, as well as in the wings of the Gaussian laser beam distribution for higher used fluence. LSFL formation was associated with the material ablation process and accompanied by the intense formation of nanoparticles, especially in the Ni/Ti system. The composition changes at the surface of both multilayer systems in the LSFL area indicated the intermixing between layers and the substrate. Concentration and distribution of all constitutive elements in the irradiated area with formed HSFLs were almost unchanged.

  14. PEMP General Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3-A - 01/01/13 to 06/30/13 WTP Contract No. DE-AC27-01RV14136 Page 1 WTP PERFORMANCE EVALUATION & MEASUREMENT PLAN - PERIOD 2013-A TABLE OF CONTENTS Num ber PEMP General Information A Introduction 2 B Roles and Responsibilities 3 C Process and Schedule 5 D Contractor Self-Assessment 5 E PEMP Numbering System and Definitions 6 F Performance Periods 7 G Incentive Ratings and Definitions 7 Attachment A - Incentive B.1 - Award Fee - Project Management Incentive 7 B.1 Aw ard Fee - Project Managem

  15. PEMP General Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2-B - 07/01/12 to 12/31/12 WTP Contract No. DE-AC27-01RV14136 Page 1 WTP PERFORMANCE EVALUATION & MEASUREMENT PLAN - PERIOD 2012-B TABLE OF CONTENTS Num ber PEMP General Information A Introduction 2 B Roles and Responsibilities 3 C Process and Schedule 5 D Contractor Self-Assessment 5 E PEMP Numbering System and Definitions 6 F Performance Periods 7 G Incentive Ratings and Definitions 7 Attachment A - Incentive B.1 - Award Fee - Project Management Incentive 8 B.1 Aw ard Fee - Project Managem

  16. Solvent vapor recovery by pressure swing adsorption. 1: Experimental transient and periodic dynamics of the butane-activated carbon system

    SciTech Connect (OSTI)

    Liu, Y.; Holland, C.E.; Ritter, J.A.

    1998-11-01

    An experimental investigation was carried out for the separation and recovery of butane vapor (10 to 40 vol%) from nitrogen using Westvaco BAX activated carbon in a twin-bed pressure swing adsorption (PSA) system utilizing a 4-step Skarstrom-type cycle. Twenty-four runs, covering a broad range of process and initial column conditions, were performed to investigate the transient and period process dynamics. In all cases the approach to the periodic state was very slow, taking up to 160 cycles depending on the initial condition of the beds; and peak bed temperatures of up to 105 C were observed depending on both the initial condition of the beds and the process conditions. Also, the periodic state of each run was unique when approaching a new periodic state from less contaminated beds. The uniqueness of the periodic states, together with the exceedingly high peak temperatures, inferred much about the practice of preconditioning beds to avoid high temperature excursions. The periodic enriched butane vapor concentration histories also gave considerable insight into new cycle designs for improved solvent vapor enrichment.

  17. NNSA Strategic Performance Evaluation Plan (PEP) FOR

    National Nuclear Security Administration (NNSA)

    Management and Operation of the Babcock and Wilcox Technical Services Y-12, LLC Contract Number: DE-ACOS-OOOR22800 Performance period: October 01, 2012 through September 30, 2013 . Spencer Date President and General Manager Babcock & Wilcox Technical Services Y-12, LLC jO/~ nag , Contracts & Special Initiatives ck & Wilcox Technical Services Y -12, LLC National Nuclear Security Administration Signature of Charles Spencer Signature of Charles Spencer Signature of Charles Spencer

  18. Beyond periodic orbits: An example in nonhydrogenic atoms

    SciTech Connect (OSTI)

    Dando, P.A.; Monteiro, T.S.; Delande, D.; Taylor, K.T. (Department of Mathematics, Royal Holloway, University of London, Egham, Surrey, TW20 0EX (United Kingdom) Laboratoire Kastler-Brossel, Universite Pierre et Marie Curie, 4 place Jussieu, F-75005 Paris (France) Department of Applied Mathematics and Theoretical Physics, Queen's University Belfast, Belfast, BT7 1NN (United Kingdom))

    1995-02-13

    The spectrum of hydrogen in a magnetic field is a paradigm of quantum chaos and may be analyzed accurately by periodic-orbit-type theories. In nonhydrogenic atoms, the core induces pure quantum effects, especially additional spectral modulations, which cannot be analyzed reliably in terms of classical orbits and their stability parameters. Provided core-scattered waves are included consistently, core-scattered modulations as well as corrected amplitudes for primitive orbits are in excellent agreement with quantum results. We consider whether these systems correspond to quantum chaos.

  19. DURING THIS REPORTING PERIOD, WE ISSUED 39 REPORTS; IDENTIFIED

    Energy Savers [EERE]

    39 REPORTS; IDENTIFIED $12.6 MILLION IN FUNDS PUT TO BETTER USE AND $19.3 MILLION IN QUESTIONED COSTS; OBTAINED $6.2 MILLION IN FINES, SETTLEMENTS, AND RECOVERIES, 6 CRIMINAL CONVICTIONS, 20 SUSPENSIONS AND DEBARMENTS, AND 51 CIVIL AND ADMINISTRATIVE ACTIONS; AND RECEIVED 1,679 HOTLINE CONTACTS. DURING THIS REPORTING PERIOD, WE ISSUED 39 REPORTS; IDENTIFIED $12.6 MILLION IN FUNDS PUT TO BETTER US AND $19.3 MILLION IN QUESTIONED COSTS; OBTAINED $6.2 MILLION IN FINES, SETTLEMENTS, AND RECOVERIES,

  20. Buildings Performance Database Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Overview Buildings.energy.gov/BPD BuildingsPerformanceDatabase@ee.doe.gov 2 * The BPD statistically analyzes trends in the energy performance and physical & operational characteristics of real commercial and residential buildings. The Buildings Performance Database 3 Design Principles * The BPD contains actual data on existing buildings - not modeled data or anecdotal evidence. * The BPD enables statistical analysis without revealing information about individual buildings. * The BPD cleanses

  1. Performance Measurement Analysis System

    Energy Science and Technology Software Center (OSTI)

    1989-06-01

    The PMAS4.0 (Performance Measurement Analysis System) is a user-oriented system designed to track the cost and schedule performance of Department of Energy (DOE) major projects (MPs) and major system acquisitions (MSAs) reporting under DOE Order 5700.4A, Project Management System. PMAS4.0 provides for the analysis of performance measurement data produced from management control systems complying with the Federal Government''s Cost and Schedule Control Systems Criteria.

  2. ARM - 2007 Performance Metrics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) Earth System Modeling Regional & Global Climate Modeling Terrestrial Ecosystem Science Performance Metrics User Meetings Past ARM Science Team Meetings ASR Meetings Accomplishments Accomplishments in Atmospheric Science, 2008-2013 (PDF, 7.4MB) ARM Accomplishments from the Science Program and User Facility, 1989-2008 (PDF, 696KB) 2007 Performance Metrics A Single

  3. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2013) 1 Contractor Performance Information This chapter incorporates the Office of Federal Procurement Policy (OFPP) policy that became effective October 1, 2010, Contractor Performance Assessment Reporting System (CPARS) is the single government-wide feeder system for past performance information reporting. This chapter supplements the CPARS Guide and related user manuals for all modules available at the CPARS website. The CPARS Guide includes consistent processes and procedures for

  4. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2013) 1 Contractor Performance Information This chapter incorporates the Office of Federal Procurement Policy (OFPP) policy that became effective October 1, 2010, Contractor Performance Assessment Reporting System (CPARS) is the single government-wide feeder system for past performance information reporting. This chapter supplements the CPARS Guide and related user manuals for all modules available at the CPARS website. The CPARS Guide includes consistent processes and procedures for

  5. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 2015) 1 Contractor Performance Information This chapter is updated to incorporate OFPP Memorandum dated July 10, 2014, "Making Better Use of Contractor Performance Information" which provides instruction to Contracting Officers and other members of the acquisition workforce in the pre-award phase of acquisition actions by making better use of contractor performance information. This chapter also incorporates the Office of Federal Procurement Policy (OFPP) policy that became

  6. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 2013) 1 Contractor Performance Information This updated chapter incorporates the Office of Federal Procurement Policy (OFPP) policy that effective October 1, 2010, Contractor Performance Assessment Reporting System (CPARS) is the single government-wide feeder system for past performance information reporting. This chapter supplements the CPARS Guide and related user manuals for all modules available at the CPARS website. The CPARS Guide includes consistent processes and procedures for

  7. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Monthly Performance Report June 2013 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JUN 2013 DOE/RL-2009-113 Rev 45 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report JUN 2013 DOE/RL-2009-113 Rev 45 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  8. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Monthly Performance Report August 2015 W. K. Johnson President U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report AUG 2015 DOE/RL-2009-113 Rev 71 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report AUG 2015 DOE/RL-2009-113 Rev 71 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  9. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Monthly Performance Report August 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report Aug 2011 DOE/RL-2009-113 REV 23 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report Aug 2011 DOE/RL-2009-113 REV 23 iii CONTENTS OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  10. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Monthly Performance Report December 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report Dec 2011 DOE/RL-2009-113 Rev 27 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report Dec 2011 DOE/RL-2009-113 Rev 27 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  11. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Monthly Performance Report January 2012 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JAN 2012 DOE/RL-2009-113 Rev 28 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report JAN 2012 DOE/RL-2009-113 Rev 28 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  12. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Monthly Performance Report July 2012 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JUL 2012 DOE/RL-2009-113 Rev 34 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report JUL 2012 DOE/RL-2009-113 Rev 34 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  13. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Monthly Performance Report June 2012 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JUN 2012 DOE/RL-2009-113 Rev 33 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report JUN 2012 DOE/RL-2009-113 Rev 33 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  14. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Monthly Performance Report April 2012 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report APR 2012 DOE/RL-2009-113 Rev 31 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report APR 2012 DOE/RL-2009-113 Rev 31 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  15. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Monthly Performance Report May 2012 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report MAY 2012 DOE/RL-2009-113 Rev 32 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report MAY 2012 DOE/RL-2009-113 Rev 32 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  16. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Monthly Performance Report October 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report Oct 2011 DOE/RL-2009-113 REV 25 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report Oct 2011 DOE/RL-2009-113 REV 25 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  17. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Monthly Performance Report April 2013 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report APR 2013 DOE/RL-2009-113 Rev 43 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report APR 2013 DOE/RL-2009-113 Rev 43 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  18. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    39 Monthly Performance Report December 2012 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report DEC 2012 DOE/RL-2009-113 Rev 39 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report DEC 2012 DOE/RL-2009-113 Rev 39 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  19. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Monthly Performance Report February 2013 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report FEB 2013 DOE/RL-2009-113 Rev 41 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report FEB 2013 DOE/RL-2009-113 Rev 41 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  20. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    40 Monthly Performance Report January 2013 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JAN 2013 DOE/RL-2009-113 Rev 40 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report JAN 2013 DOE/RL-2009-113 Rev 40 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  1. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Monthly Performance Report May 2013 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report MAY 2013 DOE/RL-2009-113 Rev 44 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report MAY 2013 DOE/RL-2009-113 Rev 44 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  2. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Monthly Performance Report November 2012 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report NOV 2012 DOE/RL-2009-113 Rev 38 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report NOV 2012 DOE/RL-2009-113 Rev 38 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  3. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Monthly Performance Report October 2012 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report OCT 2012 DOE/RL-2009-113 Rev 37 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report OCT 2012 DOE/RL-2009-113 Rev 37 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  4. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Monthly Performance Report September 2013 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report SEP 2013 DOE/RL-2009-113 Rev 48 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report SEP 2013 DOE/RL-2009-113 Rev 48 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  5. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Monthly Performance Report August 2014 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report AUG 2014 DOE/RL-2009-113 Rev 59 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report AUG 2014 DOE/RL-2009-113 Rev 59 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  6. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Monthly Performance Report December 2013 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report DEC 2013 DOE/RL-2009-113 Rev 51 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report DEC 2013 DOE/RL-2009-113 Rev 51 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  7. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Monthly Performance Report July 2014 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JUL 2014 DOE/RL-2009-113 Rev 58 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report JUL 2014 DOE/RL-2009-113 Rev 58 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  8. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Monthly Performance Report June 2014 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JUN 2014 DOE/RL-2009-113 Rev 57 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report JUN 2014 DOE/RL-2009-113 Rev 57 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  9. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Monthly Performance Report November 2013 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report NOV 2013 DOE/RL-2009-113 Rev 50 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report NOV 2013 DOE/RL-2009-113 Rev 50 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  10. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    60 Monthly Performance Report September 2014 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report SEP 2014 DOE/RL-2009-113 Rev 60 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report SEP 2014 DOE/RL-2009-113 Rev 60 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  11. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Monthly Performance Report December 2014 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report DEC 2014 DOE/RL-2009-113 Rev 63 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report DEC 2014 DOE/RL-2009-113 Rev 63 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  12. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Monthly Performance Report June 2015 W. K. Johnson President U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JUN 2015 DOE/RL-2009-113 Rev 69 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report JUN 2015 DOE/RL-2009-113 Rev 69 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  13. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Monthly Performance Report November 2014 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report NOV 2014 DOE/RL-2009-113 Rev 62 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report NOV 2014 DOE/RL-2009-113 Rev 62 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  14. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Monthly Performance Report September 2015 W. K. Johnson President U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report SEP 2015 DOE/RL-2009-113 Rev 72 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report SEP 2015 DOE/RL-2009-113 Rev 72 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  15. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Monthly Performance Report January 2016 W. K. Johnson President U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JAN 2016 DOE/RL-2009-113 Rev 76 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report JAN 2016 DOE/RL-2009-113 Rev 76 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  16. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Monthly Performance Report November 2015 W. K. Johnson President U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report NOV 2015 DOE/RL-2009-113 Rev 74 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report NOV 2015 DOE/RL-2009-113 Rev 74 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  17. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Monthly Performance Report October 2015 W. K. Johnson President U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report OCT 2015 DOE/RL-2009-113 Rev 73 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report OCT 2015 DOE/RL-2009-113 Rev 73 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  18. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Monthly Performance Report August 2013 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report AUG 2013 DOE/RL-2009-113 Rev 47 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report AUG 2013 DOE/RL-2009-113 Rev 47 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  19. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Monthly Performance Report February 2010 F.A. Figueroa President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report February 2010 DOE/RL-2009-113 REV 5 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report February 2010 DOE/RL-2009-113 REV 5 iii CONTENTS OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  20. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Monthly Performance Report July 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report July 2011 DOE/RL-2009-113 REV 22 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report July 2011 DOE/RL-2009-113 REV 22 iii CONTENTS OVERVIEW 1.0 INTRODUCTION ......................................................................................................................... 1 1.1 Key Accomplishments

  1. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Monthly Performance Report June 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report June 2011 DOE/RL-2009-113 REV 21 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report June 2011 DOE/RL-2009-113 REV 21 iii CONTENTS OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  2. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Monthly Performance Report March 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report March 2011 DOE/RL-2009-113 REV 18 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report March 2011 DOE/RL-2009-113 REV 18 iii CONTENTS OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  3. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Monthly Performance Report May 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report May 2011 DOE/RL-2009-113 REV 20 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report May 2011 DOE/RL-2009-113 REV 20 iii CONTENTS OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  4. MSC Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Monthly Performance Report November 2011 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report Nov 2011 DOE/RL-2009-113 Rev 26 ii This page intentionally left blank. CONTENTS MSC Monthly Performance Report Nov 2011 DOE/RL-2009-113 Rev 26 iii CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key

  5. High Performance Energy Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Energy Management Reduce energy use and meet your business objectives By applying continuous improvement practices similar to Lean and Six Sigma, the BPA Energy Smart...

  6. Sustainability Performance Office News

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    management-spo1461771 Sustainability Performance Office News en Executive Order 13693 Training Now Available On Demand http:energy.govmanagementspoarticles...

  7. Hopper Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance and Optimization Compiler Comparisons Comparison of different compilers with different options on several benchmarks. Read More Using OpenMP Effectively...

  8. Multifamily Performance Program

    Broader source: Energy.gov [DOE]

    Under NYSERDA’s Multifamily Performance Program (MPP), new construction of multifamily buildings and existing multifamily buildings are eligible for incentives that improve energy savings through...

  9. Performance-based Contracting

    Office of Environmental Management (EM)

    Reference: FAR 37.6; DEAR 970.1001 Overview This section provides guidance and instruction for the development and administration of Performance-Based Contracting concepts...

  10. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    performance record or lack of satisfactory record of integrity and business ethics; and o The Small Business Administration does not issue a Certificate of Competency....

  11. Application Porting and Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    opportunities, and manage multiple hierarchies of memory effectively. In the web pages that follow we document strategies for improving your application's performance....

  12. High Performance Sustainable Buildings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    science and bioscience capabiities. Occupational Medicine will become a High Performance Sustainable Building in 2013. On the former County landfill, a photovoltaic array field...

  13. Environmental Compliance Performance

    Broader source: Energy.gov [DOE]

    Most Office of Environmental Management (EM) cleanup is being performed under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) through Federal Facility Agreements...

  14. HVAC Performance Maps

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Speed Dane Christensen, PhD dane.christensen@nrel.gov National Renewable Energy Laboratory ... tools to perform a national technology assessment that identifies regional impacts ...

  15. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Optimization Performance and Optimization Running Jobs Efficiently This page defines job efficiency and how to measure the efficiency of your jobs. Read More PDSF IO Monitoring...

  16. Guidelines for Performance Measurement

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-06-30

    Federal agencies, states, businesses, and foreign governments are increasingly relying on performance measurement information to help chart progress in increasingly frugal times. No cancellations.

  17. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... CV cost variance. D&D Deactivation and Decommissioning. FY fiscal year. SV ... of Project L-685. November Performance will give a better picture of the project status. ...

  18. ARM - 2008 Performance Metrics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) Earth System Modeling Regional & Global Climate...

  19. ARM - 2006 Performance Metrics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) Earth System Modeling Regional & Global Climate...

  20. ARM - 2009 Performance Metrics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) Earth System Modeling Regional & Global Climate...

  1. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... BUSINESS OPERATIONS MSC Monthly Performance Report MAY 2015 DOERL-2009-113 Rev 68 BO-3 FINANCE AND ACCOUNTING Rate Development - MSA Business Operations transmitted an electronic ...

  2. PV Reliability & Performance Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... PV Reliability & Performance Model HomeStationary PowerEnergy Conversion ... such as module output degradation over time or disruptions such as electrical grid outages. ...

  3. Short-period pulsar oscillations following a glitch

    SciTech Connect (OSTI)

    Van Eysden, C. A.

    2014-07-10

    Following a glitch, the crust and magnetized plasma in the outer core of a neutron star are believed to rapidly establish a state of co-rotation within a few seconds by process analogous to classical Ekman pumping. However, in ideal magnetohydrodynamics, a final state of co-rotation is inconsistent with conservation of energy of the system. We demonstrate that, after the Ekman-like spin up is completed, magneto-inertial waves continue to propagate throughout the star, exciting torsional oscillations in the crust and plasma. The crust oscillation is irregular and quasi-periodic, with a dominant frequency of the order of seconds. Crust oscillations commence after an Alfvn crossing time, approximately half a minute at the magnetic pole, and are subsequently damped by the electron viscosity over approximately an hour. In rapidly rotating stars, the magneto-inertial spectrum in the core approaches a continuum, and crust oscillations are damped by resonant absorption analogous to quasi-periodic oscillations in magnetars. The oscillations predicted are unlikely to be observed in timing data from existing radio telescopes, but may be visible to next generation telescope arrays.

  4. S. 2886: a bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil or refined petroleum products. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, September 27, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    This bill amends Subtitle E of the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil or refined petroleum products. The bill inserts Chapter 54, which defines the rate of tax, procedures for its payment and for registration, and imposes penalties for non-compliance.

  5. S. 2779: a bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil and refined petroleum products to protect the national and energy security interests of the United States. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, August 15, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    The Energy Security Act of 1986 amends the Internal Revenue Code of 1954 to impose a fee on petroleum and petroleum product imports. The purpose is to protect the US national and energy security interests. The general tax rate shall be $4 per barrel, with a formula for reduction when the price is $18 or more. Exemptions include petroleum intended for export.

  6. 1Q CY2000 (PDF), Facility Representative Program Performance Indicators

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quarterly Report | Department of Energy Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report "The Facility Representative Program Performance Indicators (PIs) Quarterly Report is attached, covering the period from January 2000 to March 2000. Data for these indicators are gathered by the Field elements quarterly per the Facility Representatives Standard, DOE-STD-1

  7. 4Q CY2000 (PDF), Facility Representative Program Performance Indicators

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quarterly Report | Department of Energy 4Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report "The Facility Representative Program Performance Indicators Quarterly Report is attached, covering the period from October to December 2000. Data for these indicators are gathered by the Field elements quarterly per the Facility Representatives Standard, 063, and reported

  8. Accomplishments in Field Period Assembly for NCSX* This is how we did it

    SciTech Connect (OSTI)

    Michael Viola, J. Edwards, T. Brown, L. Dudek, R. Ellis, P. Heitzenroeder, R. Strykowsky and Michael Cole

    2009-09-14

    The National Compact Stellarator Experiment (NCSX) was a collaborative effort between ORNL and PPPL. PPPL provided the assembly techniques with guidance from ORNL to meet design criteria. The individual vacuum vessel segments, modular coils, trim coils, and toroidal field coils components were delivered to the Field Period Assembly (FPA) crew who then would complete the component assemblies and then assemble the final three field period assemblies, each consisting of two sets of three modular coils assembled over a 120o vacuum vessel segment with the trim coils and toroidal field coils providing the outer layer. The requirements for positioning the modular coils were found to be most demanding. The assembly tolerances required for accurate positioning of the field coil windings in order to generate sufficiently accurate magnetic fields strained state of the art techniques in metrology and alignment and required constant monitoring of assembly steps with laser trackers, measurement arms, and photogrammetry. The FPA activities were being performed concurrently while engineering challenges were being resolved. For example, it was determined that high friction electrically isolated shims were needed between the modular coil interface joints and low distortion welding was required in the nose region of those joints. This took months of analysis and development yet the assembly was not significantly impacted because other assembly tasks could be performed in parallel with ongoing assembly tasks as well as tasks such as advance tooling setup preparation for the eventual welding tasks. The crew technicians developed unique, accurate time saving techniques and tooling which provided significant cost and schedule savings. Project management displayed extraordinary foresight and every opportunity to gain advanced knowledge and develop techniques was taken advantage of. Despite many risk concerns, the cost and schedule performance index was maintained nearly 1.0 during the assembly phase until project cancellation. In this paper, the assembly logic, the engineering challenges, solutions to those challenges and some of the unique and clever assembly techniques, will be presented.

  9. Analysis of Thermal and Chemical Effets on Negative Valve Overlap Period Energy Recovery for Low-Temperature Gasoline Combustion

    SciTech Connect (OSTI)

    Ekoto, Dr Isaac; Peterson, Dr. Brian; Szybist, James P; Northrop, Dr. William

    2015-01-01

    A central challenge for efficient auto-ignition controlled low-temperature gasoline combustion (LTGC) engines has been achieving the combustion phasing needed to reach stable performance over a wide operating regime. The negative valve overlap (NVO) strategy has been explored as a way to improve combustion stability through a combination of charge heating and altered reactivity via a recompression stroke with a pilot fuel injection. The study objective was to analyze the thermal and chemical effects on NVO-period energy recovery. The analysis leveraged experimental gas sampling results obtained from a single-cylinder LTGC engine along with cylinder pressure measurements and custom data reduction methods used to estimate period thermodynamic properties. The engine was fueled by either iso-octane or ethanol, and operated under sweeps of NVO-period oxygen concentration, injection timing, and fueling rate. Gas sampling at the end of the NVO period was performed via a custom dump-valve apparatus, with detailed sample speciation by in-house gas chromatography. The balance of NVO-period input and output energy flows was calculated in terms of fuel energy, work, heat loss, and change in sensible energy. Experiment results were complemented by detailed chemistry single-zone reactor simulations performed at relevant mixing and thermodynamic conditions, with results used to evaluate ignition behavior and expected energy recovery yields. For the intermediate bulk-gas temperatures present during the NVO period (900-1100 K), weak negative temperature coefficient behavior with iso-octane fueling significantly lengthened ignition delays relative to similar ethanol fueled conditions. Faster ethanol ignition chemistry led to lower recovered fuel intermediate yields relative to similar iso-octane fueled conditions due to more complete fuel oxidation. From the energy analysis it was found that increased NVO-period global equivalence ratio, either from lower NVOperiod oxygen concentrations or higher fueling rates, in general led to a greater fraction of net recovered fuel energy and work as heat losses were minimized. These observations were supported by complementary single-zone reactor model results, which further indicated that kinetic time-scales favor chemical energy-consuming exothermic oxidation over slower endothermic reformation. Nonetheless, fuel energy recovery close to the thermodynamic equilibrium solution was achieved for baseline conditions that featured 4% NVO-period oxygen concentration.

  10. Technology Performance Exchange

    SciTech Connect (OSTI)

    2015-09-01

    To address the need for accessible, high-quality data, the Department of Energy has developed the Technology Performance Exchange (TPEx). TPEx enables technology suppliers, third-party testing laboratories, and other entities to share product performance data. These data are automatically transformed into a format that technology evaluators can easily use in their energy modeling assessments to inform procurement decisions.

  11. Superior Energy Performance Video

    Broader source: Energy.gov [DOE]

    Energy Efficiency, Competitiveness, Transparency. These are the tenets of the Superior Energy Performance® (SEP™). SEP is a market-based program that helps manufacturers to improve their plants' energy performance, which in turn helps to make them more competitive.

  12. Performance testing accountability measurements

    SciTech Connect (OSTI)

    Oldham, R.D.; Mitchell, W.G.; Spaletto, M.I.

    1993-12-31

    The New Brunswick Laboratory (NBL) provides assessment support to the DOE Operations Offices in the area of Material Control and Accountability (MC and A). During surveys of facilities, the Operations Offices have begun to request from NBL either assistance in providing materials for performance testing of accountability measurements or both materials and personnel to do performance testing. To meet these needs, NBL has developed measurement and measurement control performance test procedures and materials. The present NBL repertoire of performance tests include the following: (1) mass measurement performance testing procedures using calibrated and traceable test weights, (2) uranium elemental concentration (assay) measurement performance tests which use ampulated solutions of normal uranyl nitrate containing approximately 7 milligrams of uranium per gram of solution, and (3) uranium isotopic measurement performance tests which use ampulated uranyl nitrate solutions with enrichments ranging from 4% to 90% U-235. The preparation, characterization, and packaging of the uranium isotopic and assay performance test materials were done in cooperation with the NBL Safeguards Measurements Evaluation Program since these materials can be used for both purposes.

  13. Employee Performance Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-14

    To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. Cancels DOE O 331.1A and (2) existing provisions of DOE O 3450.1B. Cancelled by DOE O 331.1C.

  14. Employee Performance Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-14

    To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. (Cancels existing provisions of DOE O 3450.1B, Incentive Awards, dated 6/23/92.) Cancels DOE O 331.1A, DOE O 3450.1B. Canceled by DOE O 331.1C

  15. Employee Performance Management System

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-06-15

    To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. This Order covers most employees at grades GS-15 and below. Cancels DOE O 331.1. Canceled by DOE O 331.1B.

  16. Monthly Performance Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Monthly Performance Report October 2014 F. Armijo President and General Manager U.S. Department of Energy Contract DE-AC06-09RL14728 This page intentionally left blank. MSC Monthly Performance Report OCT 2014 DOE/RL-2009-113 Rev 61 ii CONTENTS CONTENTS EXECUTIVE OVERVIEW 1.0 INTRODUCTION .................................................................................................................... 1 1.1 Key Accomplishments

  17. Periodic local MP2 method employing orbital specific virtuals

    SciTech Connect (OSTI)

    Usvyat, Denis Schütz, Martin; Maschio, Lorenzo

    2015-09-14

    We introduce orbital specific virtuals (OSVs) to represent the truncated pair-specific virtual space in periodic local Møller-Plesset perturbation theory of second order (LMP2). The OSVs are constructed by diagonalization of the LMP2 amplitude matrices which correspond to diagonal Wannier-function (WF) pairs. Only a subset of these OSVs is adopted for the subsequent OSV-LMP2 calculation, namely, those with largest contribution to the diagonal pair correlation energy and with the accumulated value of these contributions reaching a certain accuracy. The virtual space for a general (non diagonal) pair is spanned by the union of the two OSV sets related to the individual WFs of the pair. In the periodic LMP2 method, the diagonal LMP2 amplitude matrices needed for the construction of the OSVs are calculated in the basis of projected atomic orbitals (PAOs), employing very large PAO domains. It turns out that the OSVs are excellent to describe short range correlation, yet less appropriate for long range van der Waals correlation. In order to compensate for this bias towards short range correlation, we augment the virtual space spanned by the OSVs by the most diffuse PAOs of the corresponding minimal PAO domain. The Fock and overlap matrices in OSV basis are constructed in the reciprocal space. The 4-index electron repulsion integrals are calculated by local density fitting and, for distant pairs, via multipole approximation. New procedures for determining the fit-domains and the distant-pair lists, leading to higher efficiency in the 4-index integral evaluation, have been implemented. Generally, and in contrast to our previous PAO based periodic LMP2 method, the OSV-LMP2 method does not require anymore great care in the specification of the individual domains (to get a balanced description when calculating energy differences) and is in that sense a black box procedure. Discontinuities in potential energy surfaces, which may occur for PAO-based calculations if one is not careful, virtually disappear for OSV-LMP2. Moreover, due to much increased compactness of the pair-specific virtual spaces, the OSV-LMP2 calculations are faster and require much less memory than PAO-LMP2 calculations, despite the noticeable overhead of the initial OSV construction procedure.

  18. Performance Measures | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Measures Performance Measures Contract FY2013 End of Year Report

  19. Chaotic dynamics in a periodically driven spin-1 condensate

    SciTech Connect (OSTI)

    Cheng Jing [Department of Physics, South China University of Technology, Guangzhou 510640 (China); Kavli Institute for Theoretical Physics China, CAS, Beijing 100190 (China)

    2010-02-15

    We use periodically modulated magnetic fields to drive spin-1 Bose-Einstein condensates (BECs) and study the corresponding spin-mixing dynamics. Due to the time-dependent driving, this system permits chaotic dynamics depending on the drive parameters, which could not occur in previous studies. From the investigation of the Poincare sections, we find there exist complex trajectories in the phase space, leading to very complicated structures of the phase space with mixed regular and chaotic regions. By calculating the quasienergy levels of the corresponding Floquet operators, the signatures of quantum chaos are also found in this system. The level spacing distribution is very close to the Poisson distribution or Wigner distribution when the corresponding classical dynamics is regular or chaotic.

  20. Transverse commensurability effect for vortices on periodic pinning arrays

    SciTech Connect (OSTI)

    Reichhardt, Charles; Reichhardt, Cynthia J

    2008-01-01

    Using computer simulations, we demonstrate a type of commensurability that occurs for vortices moving longitudinally through periodic pinning arrays in the presence of an additional transverse driving force. As a function of vortex density, there is a series of broad maxima in the transverse critical depinning force that do not fall at the matching fields where the number of vortices equals an integer multiple of the number of pinning sites. The commensurability effects are associated with dynamical states in which evenly spaced structures consisting of one or more moving rows of vortices form between rows of pinning sites. Remarkably, the critical transverse depinning force can be more than an order of magnitude larger than the longitudinal depinning force.

  1. IUPAC Periodic Table of Isotopes for the Educational Community

    SciTech Connect (OSTI)

    Holden N. E.; Holden,N.E.; Coplen,T.B.

    2012-07-15

    John Dalton first proposed the concept of atomic weights of the elements in the first decade of the nineteenth century. These atomic weights of the chemical elements were thought of as constants of nature, similar to the speed of light. Dmitri Mendeleev arranged the atomic weights of the elements in ascending order of value and used the systematic variation of their chemical properties to produce his Periodic Table of the Elements in 1869. Measurement of atomic weight values became an important chemical activity for a century and a half. Theodore Richards received a Noble Prize for his work in this area. In 1913, Fredrick Soddy found a species of radium, which had an atomic weight value of 228, compared to the familiar radium gas value of 226. Soddy coined the term 'isotope' (Greek for 'in the same place') to account for this second atomic weight value in the radium position of the Periodic Table. Both of these isotopes of radium are radioactive. Radioactive isotopes are energetically unstable and will decay (disintegrate) over time. The time it takes for one half of a sample of a given radioactive isotope to decay is the half-life of that isotope. In addition to having different atomic weight values, radium-226 and radium-228 also have different half-life values. Around the same time as Soddy's work, J.J. Thomson (discoverer of the electron) identified two stable (non-radioactive) isotopes of the same element, neon. Over the next 40 years, the majority of the known chemical elements were found to have two or more stable (or long-lived radioactive isotopes that contribute significantly to the determination of the atomic weights of the elements).

  2. Physics Division progress report for period ending September 30, 1984

    SciTech Connect (OSTI)

    Livingston, A.B. (ed.)

    1985-01-01

    The research activities of the Division are centered primarily in three areas: experimental nuclear physics, experimental atomic physics, and theoretical nuclear and atomic physics. The largest of these efforts, experimental nuclear physics, is dominated by the heavy ion research program. A major responsibility under this program is the operation of the Holifield Heavy Ion Research Facility as a national user facility. During the period of this report, the facility has begun routine operation for the experimental program. The experimental atomic physics program has two components: the accelerator-based studies of basic collisional phenomena and the studies in support of the controlled fusion program. Also associated with the fusion-related studies are a plasma diagnostics program and the operation of an atomic physics data center. The theoretical physics program, both nuclear and atomic, is covered. This program has benefited this year from the success of the VAX-AP computer system and from the increase in manpower provided by the ORNL/University of Tennessee Distinguished Scientist Program. Smaller programs in applications and high-energy physics are summarized. During the period of this report, we continued to explore possible future extensions of the Holifield Facility. We retain a strong interest in a relativistic heavy-ion collider in the 10 x 10 GeV/nuclear energy range. The ideas for such a facility, described in last year's report, have been modified to utilize the HHIRF 25 MV tandem accelerator as the first stage. Finally, the report concludes with some general information on publications, Division activities, and personnel changes.

  3. Property:OpenEI/UtilityRate/DemandChargePeriod1 | Open Energy...

    Open Energy Info (EERE)

    Jump to: navigation, search This is a property of type Number. Name: Demand Charge Period 1 Pages using the property "OpenEIUtilityRateDemandChargePeriod1"...

  4. Technical Letter Report: Evaluation and Analysis of a Few International Periodic Safety Review Summary Reports

    SciTech Connect (OSTI)

    Chopra, Omesh K.; Diercks, Dwight R.; Ma, David Chia-Chiun; Garud, Yogendra S.

    2013-12-17

    At the request of the United States (U.S.) government, the International Atomic Energy Agency (IAEA) assembled a team of 20 senior safety experts to review the regulatory framework for the safety of operating nuclear power plants in the United States. This review focused on the effectiveness of the regulatory functions implemented by the NRC and on its commitment to nuclear safety and continuous improvement. One suggestion resulting from that review was that the U.S. Nuclear Regulatory Commission (NRC) incorporate lessons learned from periodic safety reviews (PSRs) performed in other countries as an input to the NRC’s assessment processes. In the U.S., commercial nuclear power plants (NPPs) are granted an initial 40-year operating license, which may be renewed for additional 20-year periods, subject to complying with regulatory requirements. The NRC has established a framework through its inspection, and operational experience processes to ensure the safe operation of licensed nuclear facilities on an ongoing basis. In contrast, most other countries do not impose a specific time limit on the operating licenses for NPPs, they instead require that the utility operating the plant perform PSRs, typically at approximately 10-year intervals, to assure continued safe operation until the next assessment. The staff contracted with Argonne National Laboratory (Argonne) to perform a pilot review of selected translated PSR assessment reports and related documentation from foreign nuclear regulatory authorities to identify any potential new regulatory insights regarding license renewal-related topics and NPP operating experience (OpE). A total of 14 PSR assessment documents from 9 countries were reviewed. For all of the countries except France, individual reports were provided for each of the plants reviewed. In the case of France, three reports were provided that reviewed the performance assessment of thirty-four 900-MWe reactors of similar design commissioned between 1978 and 1988. All of the reports reviewed were the regulator’s assessment of the PSR findings rather than the original PSR report, and all but one were English translations from the original language. In these reviews, it was found that most of the countries base their regulatory guidance to some extent (and often to a large extent) on U.S. design codes and standards, NRC regulatory guidance, and U.S. industry guidance. In addition, many of the observed operational technical issues and OpE events reported for U.S. reactors are also cited in the PSR reports. The PSR reports also identified a number of potential technical material/component performance issues and OpE events that are not commonly reported for U.S. plants.

  5. Performance (perfSONAR)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance (perfSONAR) Network R&D Software-Defined Networking (SDN) Experimental Network Testbeds Performance (perfSONAR) Software & Tools Development Data for Researchers Partnerships Publications Workshops Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Network Performance and Troubleshooting (perfSONAR) perfSONAR:

  6. Performance Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plans Performance Plans November 13, 2015 Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan November 6, 2014 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan December 13,

  7. Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    An Energy Savings Performance Contract (ESPC) is a partnership between a system owner and an Energy Services Company (ESCO). The ESCO conducts a comprehensive energy audit for the facility under...

  8. Pay for Performance Program

    Broader source: Energy.gov [DOE]

    The New Hampshire Pay for Performance (P4P) program works with large energy consumers to improve energy efficiency in their facilities. This program is available to commercial, industrial, and...

  9. High Performance Sustainable Building

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-11-09

    This Guide highlights the DOE O 413.3B drivers for incorporating high performance sustainable building (HPSB) principles into Critical Decisions 1 through 4 and provides guidance for implementing the Order's HPSB requirements.

  10. High Performance Sustainable Building

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-11-09

    This Guide provides approaches for implementing the High Performance Sustainable Building (HPSB) requirements of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets. Supersedes DOE G 413.3-6.

  11. Energy Performance Contracting

    Broader source: Energy.gov [DOE]

    Provides an Energy Savings Performance Contracting (ESPC) overview and summary of ESPC resources, including training, sample documents, and guides from the U.S. Department of Housing and Urban Development. Author: U.S. Department of Housing and Urban Development

  12. DAS performance analysis

    SciTech Connect (OSTI)

    Bates, G.; Bodine, S.; Carroll, T.; Keller, M.

    1984-02-01

    This report begins with an overview of the Data Acquisition System (DAS), which supports several of PPPL's experimental devices. Performance measurements which were taken on DAS and the tools used to make them are then described.

  13. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7.2 (May 2014) 2 2014 Critical Few Performance Measures * Policy Flash 2013-73 dated ... Strategic sourcing is a branch and tenet of Supply Chain Management; strategic sourcing ...

  14. Mr. Frank Russo, Project Director Bechtel National, Inc. 2435 Stevens Center Place

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NTO. ~,U.S. Department of Energy P.O. Box 450, MSIN 1-6-60 IAIFSO\Richland, Washington 99352 SEP 1 7 Z012 I 2-WTP-0291 Mr. Frank Russo, Project Director Bechtel National, Inc. 2435 Stevens Center Place Richland. Washington 99354 Dear Mr. Russo: CONTRACT NO. DF-AC27-01 RV 14136 -AWARD ELIF 1)ETERMINATION FOR PERIO[D 2 012 -A References: 1 . Contract No. DE-AC27-()IRV 14136 -Section 13.7 Ax\ ard Fee Administration. 2. Performance Evaluation and Measurement Plan (PFN'P) for Award Fee Period 2012-A.

  15. Electric Vehicle Battery Performance

    Energy Science and Technology Software Center (OSTI)

    1992-02-20

    DIANE is used to analyze battery performance in electric vehicle (EV) applications. The principal objective of DIANE is to enable the prediction of EV performance on the basis of laboratory test data for batteries. The model provides a second-by-second simulation of battery voltage and current for any specified velocity/time or power/time profile. Two releases are included with the package. Diane21 has a graphics capability; DIANENP has no graphics capability.

  16. Performance Application Programming Interface

    Energy Science and Technology Software Center (OSTI)

    2005-10-31

    PAPI is a programming interface designed to provide the tool designer and application engineer with a consistent interface and methodology for use of the performance counter hardware found in most major microprocessors. PAPI enables software engineers to see, in near real time, the relation between software performance and processor events. This release covers the hardware dependent implementation of PAPI version 3 for the IBM BlueGene/L (BG/L) system.

  17. Performance and Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Math Library Performance Core Specialization Hyper-Threading DLFM library tools for large scale dynamic applications Cray XC30 Documentation Alva - Test and Development System for Edison HPX - 5 on Edison, Cori and Babbage PDSF Genepool Testbeds Retired Systems Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training & Tutorials Software Policies User Surveys NERSC Users Group User Announcements Help

  18. High Performance Sustainable Buildings

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Buildings Goal 3: High Performance Sustainable Buildings Maintaining the conditions of a building improves the health of not only the surrounding ecosystems, but also the well-being of its occupants. Energy Conservation» Efficient Water Use & Management» High Performance Sustainable Buildings» Greening Transportation» Green Purchasing & Green Technology» Pollution Prevention» Science Serving Sustainability» ENVIRONMENTAL SUSTAINABILITY GOALS at LANL The Radiological Laboratory

  19. Application Porting and Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Application Porting and Performance Application Porting and Performance We expect many applications will need to make code modifications in order to run efficiently on the Cori Phase 2 Knights Landing manycore architecture. To run well on Cori Phase 2, your application will need to have good thread scalability, take advantage of vectorization opportunities, and manage multiple hierarchies of memory effectively. In the web pages that follow we document strategies for improving your application's

  20. Application Porting and Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Profiling Your Application Improving OpenMP Scaling Measuring and Understanding Memory Bandwidth Vectorization Using on-package memory Using High Performance Libraries and Tools Testbeds Cori Training Dungeon Session Worksheet NESAP NERSC-8 Procurement Programming models File Storage and I/O Edison PDSF Genepool Testbeds Retired Systems Storage & File Systems Data & Analytics Connecting to NERSC Queues and Scheduling Job Logs & Statistics Application Performance Training &

  1. Buildings Performance Database

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Buildings Performance Database Paul Mathew Lawrence Berkeley National Laboratory pamathew@lbl.gov (510) 486 5116 April 3, 2013 Standard Data Spec API 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: * Large-scale high-quality empirical data on building energy performance is critical to support decision- making and increase confidence in energy efficiency investments. * While there are a many potential sources for such data, they: - are dispersed

  2. PERFORMANCE GUARANTEE AGREEMENT

    National Nuclear Security Administration (NNSA)

    F PERFORMANCE GUARANTEE SEE ATTACHED Appendix F - Page 308 PERFORMANCE GUARANTEE AGREEMENT For value received, and in consideration of, and in order to induce the United States (the Government) to enter into Contract DE-AC52-07NA27344 for the management and operation of the Lawrence Livermore National Laboratory (the "Contract") dated __________, by and between the Government and Lawrence Livermore National Security LLC (Contractor), the undersigned, Bechtel National, Inc. (Guarantor),

  3. SES Performance-Based Pay Increase

    Broader source: Energy.gov [DOE]

    An agency may provide a pay increase to allow a senior executive to advance his or her relative position with the SES rate range only upon a determination by the authorized agency official that the executive’s individual performance and/or contribution to agency performance so warrant. A senior executive who receives an annual summary rating of Outstanding or equivalent may be considered for an annual pay increase. A senior executive who receives an annual summary rating of less than Fully Successful or equivalent may not receive an increase in pay for the current appraisal period. The expectation is that executives who are paid consistent with their current level of responsibilities and who receive an acceptable (“Fully Successful” or better) annual summary rating will be eligible to receive a discretionary performance-based pay increase. Pay increases that advance an executive's position in the SES rate range restart the clock under the 12-month rule.

  4. Repository Performance Confirmation - 12119

    SciTech Connect (OSTI)

    Hansen, F.D. [Sandia National Laboratories, Albuquerque, New Mexico 87185 (United States)

    2012-07-01

    Repository performance confirmation links the technical bases of repository science and societal acceptance. Among the countless aspects of monitoring, performance confirmation holds a special place, involving distinct activities combining technical and social significance in radioactive waste management. Discussion is divided into four themes: 1. A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives, 2. A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain, 3. A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant, and 4. An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. Experience from two repository programs in the United States sheds light on how performance confirmation has been executed. Lessons learned can help the next generation of performance confirmation. (author)

  5. Repository performance confirmation.

    SciTech Connect (OSTI)

    Hansen, Francis D.

    2011-09-01

    Repository performance confirmation links the technical bases of repository science and societal acceptance. This paper explores the myriad aspects of what has been labeled performance confirmation in U.S. programs, which involves monitoring as a collection of distinct activities combining technical and social significance in radioactive waste management. This paper is divided into four parts: (1) A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives; (2) A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain; (3) A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant; and (4) An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. A fundamental consideration is the differentiation of confirmation monitoring from the many other testing and monitoring activities. Recently, the license application for Yucca Mountain provided a case study including a technical process for meeting regulatory requirements to confirm repository performance as well as considerations related to the preservation of retrievability. The performance confirmation plan developed as part of the Yucca Mountain license application identified a broad suite of monitoring activities. A revision of the plan was expected to winnow the number of activities down to a manageable size. As a result, an objective process for the next stage of performance confirmation planning was developed as an integral part of an overarching long-term testing and monitoring strategy. The Waste Isolation Pilot Plant compliance monitoring program at once reflects its importance to stakeholders while demonstrating adequate understanding of relevant monitoring parameters. The compliance criteria were stated by regulation and are currently monitored as part of the regulatory rule for disposal. At the outset, the screening practice and parameter selection were not predicated on a direct or indirect correlation to system performance metrics, as was the case for Yucca Mountain. Later on, correlation to performance was established, and the Waste Isolation Pilot Plant continues to monitor ten parameters originally identified in the compliance certification documentation. The monitoring program has proven to be effective for the technical intentions and societal or public assurance. The experience with performance confirmation in the license application process for Yucca Mountain helped identify an objective, quantitative methodology for this purpose. Revision of the existing plan would be based on findings of the total system performance assessment. Identification and prioritization of confirmation activities would then derive from performance metrics associated with performance assessment. Given the understanding of repository performance confirmation, as reviewed in this paper, it is evident that the performance confirmation program for the Yucca Mountain project could be readily re-engaged if licensing activities resumed.

  6. Progress report for the first twenty-one months of the contract period

    SciTech Connect (OSTI)

    Not Available

    1980-01-01

    During the period of July 1, 1978, through March 31, 1980 in-depth research of the legal and institutional obstacles and incentives to the development of small scale hydroelectric power in all of the nineteen northeastern states was performed. Research into economic issues associated with the development of small scale hydroelectric power was undertaken by the project economist. Special research activities have been undertaken with respect to the federal dam safety programs, the National Pollution Discharge Elimination System requirements of the Federal Clean Water Act and the implications of those requirements to small scale hydroelectric power, riparian law on lake and reservoir fluctuation in the State of Maine, and the implications of Title II and IV of the Public Utility Regulatory Policies Act of 1978 to the development of small scale hydroelectric power. The results of these studies are reported. (LCL)

  7. THE DECAYING LONG-PERIOD OSCILLATION OF A STELLAR MEGAFLARE

    SciTech Connect (OSTI)

    Anfinogentov, S.; Nakariakov, V. M.; Mathioudakis, M.; Van Doorsselaere, T.; Kowalski, A. F.

    2013-08-20

    We analyze and interpret the oscillatory signal in the decay phase of the U-band light curve of a stellar megaflare observed on 2009 January 16 on the dM4.5e star YZ CMi. The oscillation is well approximated by an exponentially decaying harmonic function. The period of the oscillation is found to be 32 minutes, the decay time about 46 minutes, and the relative amplitude 15%. As this observational signature is typical of the longitudinal oscillations observed in solar flares at extreme ultraviolet and radio wavelengths, associated with standing slow magnetoacoustic waves, we suggest that this megaflare may be of a similar nature. In this scenario, macroscopic variations of the plasma parameters in the oscillations modulate the ejection of non-thermal electrons. The phase speed of the longitudinal (slow magnetoacoustic) waves in the flaring loop or arcade, the tube speed, of about 230 km s{sup -1} would require a loop length of about 200 Mm. Other mechanisms, such as standing kink oscillations, are also considered.

  8. Lithospheric Thickness Modeled from Long Period Surface Wave Dispersion

    SciTech Connect (OSTI)

    Pasyanos, M E

    2008-05-15

    The behavior of surface waves at long periods is indicative of subcrustal velocity structure. Using recently published dispersion models, we invert surface wave group velocities for lithospheric structure, including lithospheric thickness, over much of the Eastern Hemisphere, encompassing Eurasia, Africa, and the Indian Ocean. Thicker lithosphere under Precambrian shields and platforms are clearly observed, not only under the large cratons (West Africa, Congo, Baltic, Russia, Siberia, India), but also under smaller blocks like the Tarim Basin and Yangtze craton. In contrast, it is found that remobilized Precambrian structures like the Saharan Shield and Sino-Korean Paraplatform do not have well-established lithospheric keels. The thinnest lithospheric thickness is found under oceanic and continental rifts, as well as along convergence zones. We compare our results to thermal models of continental lithosphere, lithospheric cooling models of oceanic lithosphere, lithosphere-asthenosphere boundary (LAB) estimates from S-wave receiver functions, and velocity variations of global tomography models. In addition to comparing results for the broad region, we examine in detail the regions of Central Africa, Siberia, and Tibet. While there are clear differences in the various estimates, overall the results are generally consistent. Inconsistencies between the estimates may be due to a variety of reasons including lateral and depth resolution differences and the comparison of what may be different lithospheric features.

  9. Annual Performance Report FY 2012, Annual Performance Plan FY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2, Annual Performance Plan FY 2013 & FY 2014 Annual Performance Report FY 2012, Annual Performance Plan FY 2013 & FY 2014 PDF icon Annual Performance Report and Plan FY12 FY13 FY14...

  10. Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

  11. Sandia Energy - High Performance Computing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    High Performance Computing Home Energy Research Advanced Scientific Computing Research (ASCR) High Performance Computing High Performance Computingcwdd2015-03-18T21:41:24+00:00...

  12. NREL: Transportation Research - Fuels Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fuels Performance Photo of a man working with laboratory equipment. NREL fuel performance chemists evaluate a broad range of performance criteria, including storage stability....

  13. Performance Management | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Management Performance Management Documents available for download November 10, 2015 FY 2016 SENIOR EXECUTIVE SERVICE (SES) AND SENIOR PROFESSIONAL (SP) PERFORMANCE...

  14. Environmental Management Performance Report May 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-05-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-FU) a report of the Project Hanford Management Contractors' (PHMC)' Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, Metrics, and Cost/Schedule data contained herein is as of March 31, 2000. All other information is updated as noted.

  15. Environmental Management Performance Report March 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-03-16

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000.

  16. QER- Comment of Christopher Fee

    Broader source: Energy.gov [DOE]

    Until you stop subsidizing and worshipping at the altar of Big Energy, all this "We the people" crapola is just that. We no longer have. Democracy, Mr. Reed, because our government is owned by heartless men with big pockets. Sent from my iPhone. La dee freakin' da.

  17. Study On Laser-Induced Periodic Structures And Photovoltaic Application

    SciTech Connect (OSTI)

    Torres, R.; Vervisch, V.; Derrien, T.; Sarnet, T.; Sentis, M.; Itina, T. E.; Halbwax, M.; Ferreira, J.; Torregrosa, F.; Roux, L.

    2010-10-08

    We have irradiated silicon with a series of femtosecond laser pulses to improve light absorption at the silicon surface. The laser treated surface namely black silicon shows excellent optical properties on mono and multicrystalline silicon wafers with a reflectivity reduction down to 3%, without crystal orientation dependence. After the laser process, the front side of samples has been boron-implanted by Plasma Immersion Ion Implantation to create the 3D p{sup +} junction. Improved electrical performances have also been demonstrated with a 57% increase in the photocurrent, compared to non-texturized surface.

  18. Internet Performance to Africa

    SciTech Connect (OSTI)

    Cottrell, L

    2003-10-01

    We report the first results ever for real-time Internet performance to Africa using the PingER methodology. Multiple monitoring hosts were used to enable comparisons with performance from different parts of the world. From these preliminary measurements, we have found that Internet packet losses to some African sites in recent months range from very poor to bad (> 12%), some getting better, others are holding steady or getting worse. This, together with the average monthly Round Trip Times, imply end-to-end maximum TCP throughputs that are order of magnitudes different between countries in the region. Africa is shown to be far from the Internet performance in industrialized nations due to the poor infrastructure in place today. These monitoring efforts can provide valuable information to analyze the relative rates of future improvement and today they help us to quantify the digital divide and can provide quantitative information to policy makers.

  19. EIS-0472: Re-Opening of the Public Comment Period | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Re-Opening of the Public Comment Period EIS-0472: Re-Opening of the Public Comment Period Draft Uranium Leasing Program PEIS, Mesa, Montrose, and San Miguel Counties, Colorado DOE is re-opening the public comment period for the Draft Uranium Leasing Programmatic Environmental Impact Statement made available for public comment on March 15, 2013. The public comment period will now end on July 1, 2013. PDF icon EIS-0472-DEIS-CmntPeriod-Reopening-2013.pdf PDF icon

  20. Thermoelectrics Partnership: High Performance Thermoelectric...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High Performance Thermoelectric Waste Heat Recovery System Based on Zintl Phase Materials with Embedded Nanoparticles Thermoelectrics Partnership: High Performance Thermoelectric...

  1. High Performance Sustainable Building

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-06-20

    The guide supports DOE O 413.3A and provides useful information on the incorporation of high performance sustainable building principles into building-related General Plant Projects and Institutional General Plant Projects at DOE sites. Canceled by DOE G 413.3-6A. Does not cancel other directives.

  2. High performance systems

    SciTech Connect (OSTI)

    Vigil, M.B.

    1995-03-01

    This document provides a written compilation of the presentations and viewgraphs from the 1994 Conference on High Speed Computing given at the High Speed Computing Conference, {open_quotes}High Performance Systems,{close_quotes} held at Gleneden Beach, Oregon, on April 18 through 21, 1994.

  3. MCNP Progress & Performance Improvements

    SciTech Connect (OSTI)

    Brown, Forrest B.; Bull, Jeffrey S.; Rising, Michael Evan

    2015-04-14

    Twenty-eight slides give information about the work of the US DOE/NNSA Nuclear Criticality Safety Program on MCNP6 under the following headings: MCNP6.1.1 Release, with ENDF/B-VII.1; Verification/Validation; User Support & Training; Performance Improvements; and Work in Progress. whisper methodology will be incorporated into the code, and run speed should be increased.

  4. Measuring environmental performance

    SciTech Connect (OSTI)

    Weireter, R.

    1995-12-01

    Environmental management has become increasingly complex as regulatory and social forces transform traditional business practices. In recent years, due to the growing importance and cost of environmental management, emphasis has shifted away from regulatory compliance toward the broader areas of strategic environment management and total quality environmental management. This shift in emphasis has sought to incorporate environmental management throughout the entire company, rather than confine it to the {open_quotes}environmental department.{close_quotes} This shift has produced a need to measure environmental performance so that business managers can make more informed decisions regarding appropriate management strategies. Identifying appropriate measurement indicators and incorporating this goal into traditional company management information systems has become a key challenge for many environmental professionals. The objective of the presentation will be to discuss tools which can be used to measure a company`s environmental performance, and how these tools can help managers promote more cost-effective environmental management. The presentation will contain a general overview of the issues involved in establishing an environmental performance measurement system. Topics to be addressed include environmental management information systems, developing effective environmental programs, benchmarking your current status against which to evaluate future performance, and striving for continuous environmental improvement.

  5. Contractor Past Performance Information

    Office of Environmental Management (EM)

    -----------------------------------------------------------------Chapter 7.2 (May 2014) 1 Strategic Sourcing Requirements Guiding Principles  Improving acquisition through strategic sourcing.  Taking advantage of purchasing opportunities by continually reviewing current needs against market conditions.  Requiring vendors to provide sufficient pricing usage, and performance data to enable the government to ensure we are receiving the best prices for commonly used goods and services. 

  6. Annual Performance Report

    Office of Legacy Management (LM)

    3 Through March 2014 for the Shiprock, New Mexico, Site October 2014 LMS/SHP/S12021 This page intentionally left blank U.S. Department of Energy Annual Performance Report, Shiprock, New Mexico October 2014 Doc. No. S12021 Page i Contents Abbreviations ................................................................................................................................. iii Executive Summary

  7. Annual Performance Report

    Office of Legacy Management (LM)

    4 Through March 2015 for the Shiprock, New Mexico, Site August 2015 LMS/SHP/S13080 This page intentionally left blank U.S. Department of Energy Annual Performance Report, Shiprock, New Mexico August 2015 Doc. No. S13080 Page i Contents Abbreviations ................................................................................................................................. iii Executive Summary

  8. Performance of biogas plants of different designs

    SciTech Connect (OSTI)

    Not Available

    1981-08-01

    The performance of different designs of biogas digesters were evaluated at four Khadi and Village Industries Commission (KVIC) regional centres in: Vijapadi in Gujarat, Nasik in Maharashtra, Srinagar in Jammu and Kashmir, and Allahabad in Uttar Pradesh, India. The information provided in the evaluation includes the average daily gas production per unit of digester volume for each month, the total gas produced per unit of digester volume over an 18-month period, the costs of the KVIC-designed biogas digesters of different volume and the expenditures incurred in installing biogas digesters of different design.

  9. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATESORichland, Washington 99352 16-PRO-0061 DEC 17 2015 Ms. H. P. Mooers, President HPM Corporation 4304 West 2 4 th Aye, Suite 100 Kennewick, Washington 99338 Dear Ms. Mooers: CONTRACT NO. DE-EM0002043 - HPM CORPORATION (HPMC) FISCAL YEAR 2015 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FEE DETERMINATION The U.S. Department of Energy Richland Operation Office (RL) has completed its evaluation of I-PMC's performance for the period of October 1, 2014, through September 30, 2015. As the Fee

  10. Annual Performance Report FY 2005 Annual Performance Plan FY 2006 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 5 Annual Performance Plan FY 2006 Annual Performance Report FY 2005 Annual Performance Plan FY 2006 Annual Performance Report FY 2005 Annual Performance Plan FY 2006 PDF icon Annual Performance Report FY 2005 Annual Performance Plan FY 2006 More Documents & Publications U.S. Department of Energy 2006 Annual Report FTCP Annual Plan - Fiscal Year 2005 FY 2008 E-Government Act Report

  11. Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994

    SciTech Connect (OSTI)

    1995-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and {open_quotes}Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities{close_quotes} (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported.

  12. DOE Awards Contract for Environmental Remediation Services at California Santa Susana Field Laboratory

    Broader source: Energy.gov [DOE]

    Cincinnati – The Department of Energy (DOE) today awarded a task order (contract) to CDM, A Joint Venture, of Fairfax, Virginia, to provide environmental remediation services for the Energy Technology Engineering Center at the Santa Susana Field Laboratory, Canoga Park, California. The cost-plus incentive fee task order has a 36-month performance period and a value of $11.3 million.

  13. Environmental Management Performance Report June 2000

    SciTech Connect (OSTI)

    EDER, D.M.

    2000-06-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.

  14. NETL F 4220.50#

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    220.50# (12/1999) OPI=PS10 (Previous Editions Obsolete) STATEMENT OF COST 1. Contractor Name 2. Contract No. 3. Voucher No. 4. Contractor Address 5. Period of Performance Covered by this Billing 6. CONTRACT AMOUNT: (Face value) 7. AMOUNT AUTHORIZED FOR EXPENDITURE: (Obligated) Estimated Cost $ Basic Contract $ Fixed Fee (if any) $ All Modifications $ TOTAL $ Contract to Date: TOTAL $ 8. CLAIMED COSTS BILLING PERIOD BILLING PERIOD 9. AMOUNT CLAIMED FOR THIS 10. CUMULATIVE CLAIMED FOR THIS Direct

  15. HIGS Flux Performance Projection

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HIGS flux performance table for high-flux, quasi-CW operation, DFELL/TUNL, Nov. 9, 2010 (Version 2.3). HIGS Flux Performance Projection (2010 - 2011) Total Flux [g/s] CW Operation Two-Bunch (*) Collimated Flux (∆E γ /E γ = 5% FWHM) (#), (@) FEL λ [nm] Comment No-loss Mode : < 20 MeV Linear Pol. with OK-4 Circular Pol with OK-5 E γ = 1 - 2 MeV (E e = 237 - 336 MeV) 1 x 10 8 - 4 x 10 8 6 x 10 6 - 2.4 x 10 7 1064 Linear and Circular (a), (b) E γ = 2 - 2.9 MeV (E e = 336 - 405 MeV) 4 x 10

  16. DOE/NNSA Strategic Performance Evaluation Plan (PEP) Template

    National Nuclear Security Administration (NNSA)

    Template FOR MANAGEMENT AND OPERATION OF THE LOS ALAMOS NATIONAL LABORATORY Contract Number: DE-AC52-06NA25396 Performance period: October 01, 2013 through September 30, 2014 * \\\ \\\ \Q Date\ ' Director Los Alamos National Laboratory 11/1~/13 Steven K. Shook Date Chief, Prime Contracts Office Los Alamos National Laboratory FY 2014 Performance Evaluation Plan (PEP) I -* 1/-/'fll William I. White Date Acting Field Office Manager Los Alamos Field Office National Nuclear Security Administration

  17. Microsoft Word - FY13 NSTec Performance Evaluation Report (Public)

    National Nuclear Security Administration (NNSA)

    NNSA Corporate CPEP Process NNSA NATIONAL SECURITY TECHNOLOGIES, LLC PER NNSA/NA-00.2 Page 1 of 21 National Nuclear Security Administration FY 2013 PEP NATIONAL SECURITY TECHNOLOGIES, LLC Performance Evaluation Report NEVADA FIELD OFFICE NNSS Performance Period: October 2012 - September 2013 December 16, 2013 Executive Summary The Nevada National Security Site (NNSS) is managed and operated by National Security Technologies, LLC (NSTec) for the U.S. Department of Energy, National Nuclear

  18. Underhood Thermal Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Underhood Thermal Performance This email address is being protected from spambots. You need JavaScript enabled to view it. - Computational Fluid Dynamics Project Leader Background As vehicle technology advances, automakers need a better understanding of underhood heat loads, especially as they relate to emissions and fuel efficiency. Manufacturers of heavy-duty vehicles and off-road machines have similar concerns. Ineffective underhood thermal management can lead to higher emissions, reduced

  19. Advances in Performance Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Researchers at Sandia National Laboratories originated an innovative approach to determining the safety of geologic repositories for radioactive waste disposal called "performance assessment", PA. The discipline of PA continues to advance within the Defense Waste Management Programs as computing capabilities advance and as the discipline is used in an expanding portfolio of applications both nationally and internationally. Do Radioactive Waste Disposal Options Assure Safety for

  20. Occupational Safety Performance

    Office of Environmental Management (EM)

    Q1 2012 rates should be considered preliminary as of the date of this report (July 2012). All data has not yet been submitted to CAIRS. 1 Occupational Safety Performance Comparable Industry, Average TRC Rate Comparable Industry, Average DART Case Rate Comparable Industries 2010 EM = Heavy and Civil Engineering Construction (NAICS 237) Office of Environmental Management (EM) * TRC and DART Case Rates declined while work hours increased from 2009 through 2011. * Both TRC and DART Case Rates are

  1. High Performance Computing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Computing - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced

  2. Roadside Hardware Performance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Roadside Hardware Safety Performance Background Roadside hardware, such as traffic and work zone barriers, bridge railings, and crash cushions, prevent vehicles from leaving the road at dangerous locations. Crash testing of a large variety of vehicles into this hardware, as a means of optimizing the hardware design, is extremely expensive, often costing approximately $500,000 and 10,000 person-hours per test. The increasing diversity of automobiles and trucks, as well as the advent of the next

  3. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2013) 1 Reporting Other Contractor Information into Federal Awardee Performance and Integrity Information System (FAPIIS) References Federal Acquisition Regulation (FAR) Subparts 8.4 Federal Supply Schedules - 8.406 Ordering activity responsibilities 9.1 Responsible Prospective Contractors - 9.104 Solicitation provisions and contract clauses and 9.105 Procedures 9.4 Debarment, Suspension and Ineligibility - 9.406 Debarment and 9.407 Suspension 12.4 Unique Requirements Regarding Terms and

  4. Remedial Action Performed

    Office of Legacy Management (LM)

    Aliquippa Forge Site in Aliquippa, Pennsylvania Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKE.~ FOR THE REMEDIAL ACTION PERFORMED AT THE ALIQUIPPA FORGE SITE IN ALIQUIPPA, PENNSYLVANIA NOVEMBER 1996 Prepared for . UNITED STATES DEPARTMENT OF ENERGY Oak Ridge Operations Office Under Contract No. DE-AC05-9 1 OR2 1949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 CONTENTS Page FIGURES v . . . . . . . . . . .

  5. Remedial Action Performed

    Office of Legacy Management (LM)

    Baker and Williams Warehouses Site in New York, New York, 7997 - 7993 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 7 995 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE BAKER AND WILLIAMS WAREHOUSES SITE IN NEW YORK, NEW YORK, 1991-1993 NOVEMBER 1995 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC05-910R21949 BY Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. 14501 __

  6. Remedial Action Performed

    Office of Legacy Management (LM)

    Alba Craft Laboratory and Vicinity Properties Site in Oxford, Ohio C Department of Energy Former Sites Restoration Division Oak Ridge Operations Office January 1997 $$@T Op% 3 @!B . i~d!l Ab Printed on recycled/recyclable paper. CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE FORMER ALBA CRAFT LABORATORY AND VICINITY PROPERTIES SITE IN OXFORD, OHIO JANUARY 1997 Prepared for United States Department of Energy Oak Ridge Operations Office Under Contract No. DE-AC0591 OR2 1949 Bechtel

  7. Remedial Action Performed

    Office of Legacy Management (LM)

    ' at the C. H. Schnoor Site, Springdale, Pennsylvania, in 1 994 Department of Energy Former Sites Restoration Division Oak Ridge Operations Office November 1996 CERTIFICATION DOCKET FOR THE REMEDIAL ACTION PERFORMED AT THE C. H. SCHNOOR SITE SPRINGDALE, PENNSYLVANIA, IN 1994 NOVEMBER 1996 prep&ed for United States Department of ~nergy Oak Ridge Operations Off= r Under Contract No. DE-AC05-910R21949 Bechtel National, Inc. Oak Ridge, Tennessee Bechtel Job No. '14501 CONTENTS FIGURES . . . . .

  8. Technology Performance Exchange

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Performance Exchange TDM - Jason Koman (BTO) TDM - Dave Catarious (FEMP) William Livingood National Renewable Energy Laboratory William.Livingood@nrel.gov 303-384-7490 April 2, 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem: Perceived fiscal risk associated with the installation of unfamiliar technologies impedes adoption rates for cost-effective, energy-saving products. Impact of Project: Enable end users to quickly and confidently assess

  9. High Performance Window Attachments

    Energy Savers [EERE]

    High Performance Window Attachments D. Charlie Curcija Lawrence Berkeley National Laboratory dccurcija@lbl.gov 510-495-2602 April 4, 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Impact of Project: * Motivate manufacturers to make improvements in Window systems U-Factors, SHGC and daylighting utilization * Increase awareness of benefits from energy efficient window attachments Problem Statement: * A wide range of residential window attachments are available, but

  10. Contractor Past Performance Information

    Office of Environmental Management (EM)

    42.16 (May 2010) 1 Reporting Other Contractor Information into Federal Awardee Performance and Integrity Information System References Federal Acquisition Regulation (FAR) Subparts 8.4 Federal Supply Schedules - 8.406 Ordering activity responsibilities 9.1 Responsible Prospective Contractors - 9.105 Procedures 9.4 Debarment, Suspension and Ineligibility - 9.406 Debarment and 9.407 Suspension 12.4 Unique Requirements Regarding Terms and Conditions for Commercial Items - 12.403 Termination 15.4

  11. Past Performance Questionnaire

    National Nuclear Security Administration (NNSA)

    The contractor should have provided you with a copy of a completed Relevant Corporate Experience Form for your contract so that you may more readily identify the contract in question and verify the accuracy of information provided therein. Please return the questionnaire to the DOE/NNSA by March 6, 2016 (see pages 3 & 4 for method of submittal) I. CONTRACT INFORMATION 1. This questionnaire relates to work performed by (Name of Contractor/Company/Division - do not use acronyms):

  12. Emergency Diesel Generation System Surveillance Test Policy Optimization Through Genetic Algorithms Using Non-Periodic Intervention Frequencies and Seasonal Constraints

    SciTech Connect (OSTI)

    Lapa, Celso M.F.; Pereira, Claudio M.N.A. [CNEN, Comissao Nacional de Energia Nuclear, Rua General Severiano 90, Rio de Janeiro, RJ-22-294-900 (Brazil); Frutuoso e Melo, P.F. [COPPE/UFRJ, Cidade Universitaria, Centro de Tecnologia, Bloco G, sala 101, Ilha do Fundao, 21945-970, Rio de Janeiro - RJ (Brazil)

    2002-07-01

    Nuclear standby safety systems must frequently, be submitted to periodic surveillance tests. The main reason is to detect, as soon as possible, the occurrence of unrevealed failure states. Such interventions may, however, affect the overall system availability due to component outages. Besides, as the components are demanded, deterioration by aging may occur, penalizing again the system performance. By these reasons, planning a good surveillance test policy implies in a trade-off between gains and overheads due to the surveillance test interventions. In order maximize the systems average availability during a given period of time, it has recently been developed a non-periodic surveillance test optimization methodology based on genetic algorithms (GA). The fact of allowing non-periodic tests turns the solution space much more flexible and schedules can be better adjusted, providing gains in the overall system average availability, when compared to those obtained by an optimized periodic tests scheme. The optimization problem becomes, however, more complex. Hence, the use of a powerful optimization technique, such as GAs, is required. Some particular features of certain systems can turn it advisable to introduce other specific constraints in the optimization problem. The Emergency Diesel Generation System (EDGS) of a Nuclear Power Plant (N-PP) is a good example for demonstrating the introduction of seasonal constraints in the optimization problem. This system is responsible for power supply during an external blackout. Therefore, it is desirable during periods of high blackout probability to maintain the system availability as high as possible. Previous applications have demonstrated the robustness and effectiveness of the methodology. However, no seasonal constraints have ever been imposed. This work aims at investigating the application of such methodology in the Angra-II Brazilian NPP EDGS surveillance test policy optimization, considering the blackout probability growth during summer, due to the electrical power demand increase. Here, the model used penalizes test interventions by a continuous modulating function, which depends on the instantaneous blackout probability. Results have demonstrated the ability of the method in adapting the surveillance tests policy to seasonal behaviors. The knowledge acquired by the GA during the searching process has lead to test schedules that drastically minimize the test interventions at periods of high blackout probability. It is compensated by more frequent tests redistributed through the periods of low blackout probability, in order to provide improvement on the overall average availability at the system level. (authors)

  13. High Performance Buildings Database

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    The High Performance Buildings Database is a shared resource for the building industry, a unique central repository of in-depth information and data on high-performance, green building projects across the United States and abroad. The database includes information on the energy use, environmental performance, design process, finances, and other aspects of each project. Members of the design and construction teams are listed, as are sources for additional information. In total, up to twelve screens of detailed information are provided for each project profile. Projects range in size from small single-family homes or tenant fit-outs within buildings to large commercial and institutional buildings and even entire campuses. The database is a data repository as well. A series of Web-based data-entry templates allows anyone to enter information about a building project into the database. Once a project has been submitted, each of the partner organizations can review the entry and choose whether or not to publish that particular project on its own Web site.

  14. FY 2013 Performance Evaluation Report Sandia Corporation, Contract DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    3 Performance Evaluation Report Sandia Corporation, Contract DE-AC04-94AL85000 National Nuclear Security Administration FY 2013 Performance Evaluation Report FOR Sandia Corporation Sandia Field Office Sandia National Laboratories Performance Period: October 2012 - September 2013 DATE: December 23, 2013 Sandia Field Office December 23, 2013 FY 2013 Performance Evaluation Report Page 1 of 23 Sandia Corporation, Contract DE-AC04-94AL85000 Executive Summary This Performance Evaluation Report (PER)

  15. Periodicity, Electronic Structures, and Bonding of Gold Tetrahalides [AuX4](-) (X = F, CI, Br, I, At, Uus)

    SciTech Connect (OSTI)

    Li, Wan-Lu; Li, Yong; Xu, Congqiao; Wang, Xue B.; Vorpagel, Erich R.; Li, Jun

    2015-12-07

    Systematic theoretical and experimental investigations have been performed to understand the periodicity and electronic structures of trivalent-gold halides using gold tetrahalides [AuX4]⁻ anions (X = F, Cl, Br, I, At, Uus). The [AuX4]⁻ (X = Cl, Br, I) anions were produced in gas phase and their negative-ion photoelectron spectra were obtained, which exhibited rich and well-resolved spectral peaks. We calculated the adiabatic as well as vertical electron detachment energies using density functional methods with scalar and spin-orbit coupling relativistic effects. The simulated photoelectron spectra based on these calculations are in good agreement with the experimental spectra. Our results show that the trivalent Au(III) oxidation state becomes progressively less stable while Au(I) is preferred when the halides become heavier along the Period Table. This trend reveals that the oxidation state of metals in complexes can be manipulated through ligand design

  16. Defective fuel rod detection in operating pressurized water reactors during periods of continuously decreasing fuel rod integrity levels

    SciTech Connect (OSTI)

    Zanker, H. )

    1989-09-01

    Periods of continuously decreasing levels of fuel rod integrity due to debris-induced cladding damage, vibration-induced fretting wear of the cladding, etc. cause difficulties in the assessment of fuel rod performance from coolant activity data. The calculational models currently in use for this purpose in nuclear power plants are not sufficiently capable of indicating cases in which they are invalid. This can mislead reactor operators by misinterpretation of the coolant activity data, especially in situations where fast reactions are necessary. A quick test of validity is suggested to check the applicability of the currently available calculational models for estimating the number and average size of fuel rod defects. This paper describes how to recognize immediately periods of continuously decreasing levels of fuel rod integrity in order to prevent complications in routine power plant maintenance as well as accident situations caused by more severe fuel rod degradation.

  17. Technical Basis for Assessing Uranium Bioremediation Performance

    SciTech Connect (OSTI)

    PE Long; SB Yabusaki; PD Meyer; CJ Murray; AL NGuessan

    2008-04-01

    In situ bioremediation of uranium holds significant promise for effective stabilization of U(VI) from groundwater at reduced cost compared to conventional pump and treat. This promise is unlikely to be realized unless researchers and practitioners successfully predict and demonstrate the long-term effectiveness of uranium bioremediation protocols. Field research to date has focused on both proof of principle and a mechanistic level of understanding. Current practice typically involves an engineering approach using proprietary amendments that focuses mainly on monitoring U(VI) concentration for a limited time period. Given the complexity of uranium biogeochemistry and uranium secondary minerals, and the lack of documented case studies, a systematic monitoring approach using multiple performance indicators is needed. This document provides an overview of uranium bioremediation, summarizes design considerations, and identifies and prioritizes field performance indicators for the application of uranium bioremediation. The performance indicators provided as part of this document are based on current biogeochemical understanding of uranium and will enable practitioners to monitor the performance of their system and make a strong case to clients, regulators, and the public that the future performance of the system can be assured and changes in performance addressed as needed. The performance indicators established by this document and the information gained by using these indicators do add to the cost of uranium bioremediation. However, they are vital to the long-term success of the application of uranium bioremediation and provide a significant assurance that regulatory goals will be met. The document also emphasizes the need for systematic development of key information from bench scale tests and pilot scales tests prior to full-scale implementation.

  18. The transition mechanism from a symmetric single period discharge to a period-doubling discharge in atmospheric helium dielectric-barrier discharge

    SciTech Connect (OSTI)

    Zhang, Dingzong; Wang, Yanhui; Wang, Dezhen [School of Physics and Optoelectronic Technology, Dalian University of Technology, Dalian 116024 (China)] [School of Physics and Optoelectronic Technology, Dalian University of Technology, Dalian 116024 (China)

    2013-06-15

    Period-doubling and chaos phenomenon have been frequently observed in atmospheric-pressure dielectric-barrier discharges. However, how a normal single period discharge bifurcates into period-doubling state is still unclear. In this paper, by changing the driving frequency, we study numerically the transition mechanisms from a normal single period discharge to a period-doubling state using a one-dimensional self-consistent fluid model. The results show that before a discharge bifurcates into a period-doubling state, it first deviates from its normal operation and transforms into an asymmetric single period discharge mode. Then the weaker discharge in this asymmetric discharge will be enhanced gradually with increasing of the frequency until it makes the subsequent discharge weaken and results in the discharge entering a period-doubling state. In the whole transition process, the spatial distribution of the charged particle density and the electric field plays a definitive role. The conclusions are further confirmed by changing the gap width and the amplitude of the applied voltage.

  19. High Performance Home Cost Performance Trade-Offs: Production Builders -

    Energy Savers [EERE]

    Building America Top Innovation | Department of Energy High Performance Home Cost Performance Trade-Offs: Production Builders - Building America Top Innovation High Performance Home Cost Performance Trade-Offs: Production Builders - Building America Top Innovation Photo of a high performance home in Florida. Building America field projects with production builders have demonstrated that high-performance homes experience significant cost trade-offs that offset other cost increases. By

  20. Integration of the EM Corporate QA Performance Metrics With Performance

    Energy Savers [EERE]

    Analysis Process | Department of Energy the EM Corporate QA Performance Metrics With Performance Analysis Process Integration of the EM Corporate QA Performance Metrics With Performance Analysis Process August 2009 Presenter: Robert Hinds, Savannah River Remediation, LLC Track 9-12 Topics Covered: Implementing CPMS for QA Corporate QA Performance Metrics Contractor Performance Analysis Contractor Assessment Programs Assessment Program Structure CPMS Integration with P/A Process Validating