Powered by Deep Web Technologies
Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Period Period Total Fee Paid 4/29/2012 - 9/30/2012 $418,348 10/1/2012 - 9/30/2013 $0 10/1/2013 - 9/30/2014 $0 10/1/2014 - 9/30/2015 $0 10/1/2015 - 9/30/2016 $0 Cumulative Fee Paid $418,348 Contract Type: Cost Plus Award Fee Contract Period: $116,769,139 November 2011 - September 2016 $475,395 $0 Fee Information Total Estimated Contract Cost $1,141,623 $1,140,948 $1,140,948 $5,039,862 $1,140,948 Maximum Fee $5,039,862 Minimum Fee Fee Available Portage, Inc. DE-DT0002936 EM Contractor Fee Site: MOAB Uranium Mill Tailings - MOAB, UT Contract Name: MOAB Uranium Mill Tailings Remedial Action Contract September 2013 Contractor: Contract Number:

2

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Period: Fee Information Maximum Fee Contract Type: Minimum Fee 91,085,394 74,386,573 Target Fee September 2002 - March 2017 Cost Plus Fixed FeeIncentive Fee 1,192,114,896...

3

Performance Period Total Fee Paid FY2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 01 $4,547,400 FY2002 $4,871,000 FY2003 $6,177,902 FY2004 $8,743,007 FY2005 $13,134,189 FY2006 $7,489,704 FY2007 $9,090,924 FY2008 $10,045,072 FY2009 $12,504,247 FY2010 $17,590,414 FY2011 $17,558,710 FY2012 $14,528,770 Cumulative Fee Paid $126,281,339 Cost Plus Award Fee DE-AC29-01AL66444 Washington TRU Solutions LLC Contractor: Contract Number: Contract Type: $8,743,007 Contract Period: $1,813,482,000 Fee Information Maximum Fee $131,691,744 Total Estimated Contract Cost: $4,547,400 $4,871,000 $6,177,902 October 2000 - September 2012 Minimum Fee $0 Fee Available EM Contractor Fee Site: Carlsbad Field Office - Carlsbad, NM Contract Name: Waste Isolation Pilot Plant Operations March 2013 $13,196,690 $9,262,042 $10,064,940 $14,828,770 $12,348,558 $12,204,247 $17,590,414 $17,856,774

4

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

FY2010 FY2011 FY2012 Fee Information Minimum Fee Maximum Fee June 2014 Contract Number: Cost Plus Incentive Fee Contractor: 3,245,814,927 Contract Period: EM Contractor Fee Site:...

5

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Number: Contract Type: Contract Period: 0 Minimum Fee Maximum Fee Washington River Protection Solutions LLC DE-AC27-08RV14800 Cost Plus Award Fee 5,553,789,617 Fee Information...

6

Performance Period Total Fee Paid FY2008  

Office of Environmental Management (EM)

Type: Maximum Fee 3,129,570 175,160 377,516 1,439,287 Fee Available 175,160 80,871 Accelerated Remediation Company (aRc) DE-AT30-07CC60013 Contractor: Contract Number:...

7

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy Savers (EERE)

Wastren-EnergX Mission Support LLC Contract Number: DE-CI0000004 Contract Type: Cost Plus Award Fee 128,879,762 Contract Period: December 2009 - July 2015 Fee Information...

8

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy Savers (EERE)

Cumulative Fee Paid 22,200,285 Wackenhut Services, Inc. DE-AC30-10CC60025 Contractor: Cost Plus Award Fee 989,000,000 Contract Period: Contract Type: January 2010 - December...

9

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

2011 - September 2015 June 2014 Contractor: Contract Number: Contract Type: Idaho Treatment Group LLC DE-EM0001467 Cost Plus Award Fee Fee Information 419,202,975 Contract Period:...

10

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Fee Paid 127,390,991 Contract Number: Fee Available Contract Period: Contract Type: Cost Plus Award Fee 4,104,318,749 28,500,000 31,597,837 0 39,171,018 32,871,600 EM...

11

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

$ 3,422,994.00 $ 3,422,994.00 FY2011 4,445,142.00 $ FY2012 $ 5,021,951.68 FY2013 $ 3,501,670.00 FY2014 $0 FY2015 $0 FY2016 $0 FY2017 $0 FY2018 $0 FY2019 $0 Cumulative Fee Paid $16,391,758 Wackenhut Services, Inc. DE-AC30-10CC60025 Contractor: Cost Plus Award Fee $989,000,000 Contract Period: Contract Type: January 2010 - December 2019 Contract Number: EM Contractor Fee Site: Savannah River Site Office - Aiken, SC Contract Name: Comprehensive Security Services September 2013 Fee Information Maximum Fee $55,541,496 $5,204,095 $3,667,493 $5,041,415 Minimum Fee 0 Fee Available $5,428,947 $6,326,114

12

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

- Oak Ridge, TN Contract Name: Transuranic Waste Processing Contract June, 2014 2,433,940 Cost Plus Award Fee 150,664,017 Fee Information Minimum Fee 2,039,246 Maximum Fee...

13

Total Estimated Contract Cost:) Performance Period Total Fee...  

Office of Environmental Management (EM)

Washington Closure LLC DE-AC06-05RL14655 Contractor: Contract Number: Contract Type: Cost Plus Incentive Fee 2,251,328,348 Fee Information 0 Maximum Fee 337,699,252...

14

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

0 Contractor: Bechtel National Inc. Contract Number: DE-AC27-01RV14136 Contract Type: Cost Plus Award Fee Maximum Fee* 595,123,540 Fee Available 102,622,325 10,714,819,974...

15

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

LLC (UCOR) DE-SC-0004645 April 29, 2011 - July 13, 2016 Contract Number: Maximum Fee Cost Plus Award Fee 16,098,142 EM Contractor Fee Site: Oak Ridge Office - Oak Ridge, TN...

16

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy Savers (EERE)

& Wilcox Conversion Services, LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee EM Contractor Fee June, 2014 Site: Portsmouth Paducah Project Office...

17

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Type: Cost Plus Award Fee 4,104,318,749 28,500,000 31,597,837 0 39,171,018 32,871,600 EM Contractor Fee Site: Savannah River Site Office - Aiken, SC Contract Name:...

18

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Analytical Services & Testing Contract June 2014 Contractor: Contract Number: Contract Type: Advanced Technologies & Labs International Inc. DE-AC27-10RV15051 Cost Plus Award Fee...

19

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

DE-AM09-05SR22405DE-AT30-07CC60011SL14 Contractor: Contract Number: Contract Type: Cost Plus Award Fee 357,223 597,797 894,699 EM Contractor Fee Site: Stanford Linear...

20

Management Controls over Performance Fees in the Idaho National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Controls over Performance Fees in the Idaho National Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 The Department of Energy (Department) did not always effectively and Fees use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures and fees for Fiscal Year (FY) 2005, which were disproportionately high for the work performed. Four of the 49 measures and fees established for FY 2006 provided the contractor the opportunity to earn $1 million under similar circumstances. Also, some of the performance measures worth $460,000, were implemented well

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

RL's Fiscal Year 2013 Fee Evaluation Summary  

NLE Websites -- All DOE Office Websites (Extended Search)

Award Period: October 2012 through September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 21,030,647 Award Fee Earned:...

22

PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP)  

NLE Websites -- All DOE Office Websites (Extended Search)

- March 2013 Page 1 - March 2013 Page 1 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP) 1 OCTOBER 2012 through 30 SEPTEMBER 2013 Contract No. DE- EM-0001971 I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) provides a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract. Fee determinations are not subject to the Disputes Clause of the contract. II. ORGANIZATIONAL STRUCTURE AND DUTIES The following organizational structure is established for administering the fee provisions of the contract. A. Roles and Responsibilities 1. Fee Determination Official (FDO) - The Head of Contracting Activity (HCA) has appointed the CBFO Manager as the FDO. The FDO

23

fees  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PRIME CONTRACTOR FEES ON PRIME CONTRACTOR FEES ON SUBCONTRACTOR COSTS U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES AUDIT REPORT DOE/IG-0427 SEPTEMBER 1998 September 11, 1998 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Acting Inspector General SUBJECT: INFORMATION : Audit Report on "The U.S. Department of Energy's Prime Contractor Fees on Subcontractor Costs" BACKGROUND In Fiscal Year 1996, the Department's prime contractors awarded $5.3 billion in subcontracts. The purpose of this audit was to determine if the Department adjusted the fee bases of prime contractors to reflect the actual effort necessary to manage the technical and administrative activities of their subcontractors.

24

Optimal investment with high-watermark performance fee Karel Janecek  

E-Print Network (OSTI)

Optimal investment with high-watermark performance fee Karel Janecek and Mihai S^irbu January 5, 2011 Abstract We consider the problem of optimal investment and consumption when the investment oppor as a geometric Brownian motion and the performance of the investment and consumption strategy is measured using

Sîrbu, Mihai

25

Contractor Fee Payments - Carlsbad Field Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Carlsbad Field Office Contractor Fee Payments - Carlsbad Field Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to...

26

Energy performance based connection fees: A case study in New York State  

Science Journals Connector (OSTI)

Energy connection fees and rebates, based on the projected energy load or efficiency of new buildings are currently being considered as a policy option for promoting greater energy efficiency in new construction. In theory, a well designed system of connection fees and rebates could provide states and utilities with a revenue neutral means of creating direct financial incentives for the construction of more energy-efficient buildings. However, a recent case study in New York State found that, in practice, many of the most important features affecting building energy efficiency could not be easily incorporated in connection fee programmes, and that implementation of even a scaled down programme would require a level of administrative commitment and resources which would be difficult to maintain. Instead of implementing connection fee programmes, the authors recommend devoting more resources to an approach based on the combined use of building energy rating systems, enhanced codes with better enforcement, and strategically placed financial incentives and design assistance.

Robert M. Wirtshafter; Eric W. Hildebrandt

1992-01-01T23:59:59.000Z

27

Contractor Fee Payments - Oak Ridge Operations | Department of...  

Office of Environmental Management (EM)

Oak Ridge Operations Contractor Fee Payments - Oak Ridge Operations See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to...

28

Contractor Fee Payments- Portsmouth Paducah Project Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the  Portsmouth Paducah Project Office on these charts.

29

Contractor Fee Payments- Office of River Protection  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Office of River Protection on these charts.

30

Contractor Fee Payments- Savannah River Site Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts. 

31

Contractor Fee Payments- Richland Operations Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Richland Operations Office on these charts. 

32

Extension of Comment Period on Improving Performance of Federal Permitting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Extension of Comment Period on Improving Performance of Federal Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. This notice announces an extension of the public comment period for submitting comments regarding the IIP Process to October 31, 2013. Extension of Comment Period on Improving Performance of Federal Permitting

33

Extension of Comment Period on Improving Performance of Federal Permitting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Extension of Comment Period on Improving Performance of Federal Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 Extension of Comment Period on Improving Performance of Federal Permitting and Review of Infrastructure Projects: Federal Register Notice Volume 78, No. 186 - September 25, 2013 On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. This notice announces an extension of the public comment period for submitting comments regarding the IIP Process to October 31, 2013. Extension of Comment Period on Improving Performance of Federal Permitting

34

FOIA FEES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fees Fees The FOIA generally requires that requestors pay fees for processing their requests. If costs associated with the processing of a FOIA request are $15.00 or less, no fees are charged. Each FOIA request is reviewed for the purpose of placing a requestor in one of four fee categories described below: 1. Commercial use requestor: Responsible for all direct costs; i.e. search for responsive documents, review of documents located for responsiveness; 16% administrative costs; reproduction cost of $.05 per page; and the time it took the FOIA Contact Person to process the request. 2. Requestors who are representative of the news media: Responsible for reproduction costs after the first 100 pages. 3. Educational and non-commercial scientific institution requestors:

35

Student Health Service Fee Student Center Fee  

E-Print Network (OSTI)

Student Health Service Fee Student Center Fee Graduate Recreation Fee Registration Fee International Student Service Fee Level Masters Doctorial Graduate Fall 2014/Spring 2015 (Amounts reflect the amount charged per semester) GR Full-Time (Registered 9 Credits/Semester or Contracted Student) GR Part

Firestone, Jeremy

36

Contract Number: Performance Period FY2011 FY2012 FY2013 FY2014  

Office of Environmental Management (EM)

Fee Information August 2011 through April 2019 EM Contractor Fee September 2014 West Valley Demonstration Project - West Valley, NY Site: 477,476,867 West Valley...

37

SUMMARY OF FEE EARNED IN FY14 (2).xlsx  

NLE Websites -- All DOE Office Websites (Extended Search)

PERFORMANCE-BASED INCENTIVES Metric 1 MAXIMUM FEE FOR METRIC 1 - 2,644,671 Cubic Meter No. of Units Fee Earned 1.a For each cubic meter of CH waste disposed at WIPP in...

38

New Student Orientation Student Health Service Fee  

E-Print Network (OSTI)

New Student Orientation Fee Student Health Service Fee Student Center Fee Student Comprehensive Fee Registration Fee International Student Service Fee Fall 2014 Spring 2015 $516 $599 Student Teaching Fee Lab Fee Descriptions This is a one-time fee charged to all new undergraduate students in order to support

Firestone, Jeremy

39

Student services fee The student services fee is distributed  

E-Print Network (OSTI)

Student services fee The student services fee is distributed among various student programs that are listed online, along with their amounts, at onestop.umn.edu/finances/costs_and_ tuition/tuition_and_fees/student_ser- vice_fees.html). If you are enrolled for 6 or more credits, you must pay a student services fee of $368

Amin, S. Massoud

40

Student services fee The student services fee is distributed  

E-Print Network (OSTI)

Student services fee The student services fee is distributed among various student programs that are listed online, along with their amounts, at onestop.umn.edu/finances/costs_and_ tuition/tuition_and_fees/student_ser- vice_fees.html). If you are enrolled for 6 or more credits, you must pay a student services fee of $414

Amin, S. Massoud

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

FY 13 Award Fee Determination Scorecard Contractor: Swift &...  

NLE Websites -- All DOE Office Websites (Extended Search)

There were no significant deficiencies but improvements are expected in work controls and conduct of operations in fiscal year 2014. Performance Based Incentives Award Fee...

42

Fee Title: Renewable Energy Fee Measure #: Measure 44  

E-Print Network (OSTI)

Fee Title: Renewable Energy Fee Measure #: Measure 44 Ballot Information Shall the undergraduates and graduate students of UCSC amend Measure 28, the Renewable Energy fee passed in Spring 2006 as follows Student Association. This measure will also allow the reserve money to be spent on energy efficiency

California at Santa Cruz, University of

43

EM Contractor Fee Payments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Fee Payments Contractor Fee Payments EM Contractor Fee Payments In the interest of furthering transparency in its government operations, the Department of Energy's Office of Environmental Management (EM) herein is releasing information relating to fee payments under its major cost-reimbursable contracts. Charts delineating fees that are paid under cost-plus-award-fee (CPAF), cost-plus-incentive-fee (CPIF), and cost-plus-fixed-fee (CPFF) contracts are listed by site location in the following hyperlinks. With CPFF contracts, the fee is negotiated and fixed at the inception of the contract. The fixed fee will not vary with the actual costs that the contractor incurs. In general, the contractor earns fee either by completing the work called for in the contract or devoting a specified

44

Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site, IG-0377  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IG-1 IG-1 INFORMATION: Report on "Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site" The Secretary BACKGROUND: During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department's annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth

45

FEDERAL LOAN FEES (Fees are deducted by the U.S. Department Of Education prior to disbursement)  

E-Print Network (OSTI)

Loan Fees A fee of 1.0% is fee assessed with an up-front fee rebate of 0.5%, resulting in a net fee of 0.5% deducted from the gross disbursement. The rebate remains in effect for all borrowers who make of the rebate is added back to the borrower's principal. Federal PLUS Loan Fees A fee of 4.0% is fee assessed

Fernandez, Eduardo

46

STUDENT SERVICES FEE ASSESSMENT REQUEST To elect to pay the Student Services Fee, fill out the form completely and return  

E-Print Network (OSTI)

STUDENT SERVICES FEE ASSESSMENT REQUEST DIRECTIONS To elect to pay the Student Services Fee, fill the Student Services Fee, you may elect to pay the fee to use or support the services covered by the fee. You of the Student Services Fee. If you are enrolled in the Senior Citizen Education Program, Regents' Scholarship

Amin, S. Massoud

47

WIPP Revised Fee Chart.xlsx  

Office of Environmental Management (EM)

6,008,123 6,008,123 * Final Fee Determination is pending. EM Contractor Fee Site: Carlsbad Field Office - Carlsbad, NM Contract Name: Waste Isolation Pilot Plant Operations...

48

SCHEDULE OF FEES Wet Milling  

E-Print Network (OSTI)

SCHEDULE OF FEES Wet Milling 100 g.......................$120..per sample* 1 kilogram of Illinois offers five milling procedures to determine processing characteristics of corn. Laboratory times. WET MILLING The wet milling process is used to produce starch (99.6% purity) as the primary

Illinois at Urbana-Champaign, University of

49

The cognitive performance of patients with multiple sclerosis during periods of high and low fatigue.  

E-Print Network (OSTI)

The objective of this study was to examine whether multiple sclerosis (MS)-related fatigue affects patients' cognitive performance. Thirty patients who had substantial fatigue in conjunction with MS and who reported marked ...

Parmenter, Brett A.; Denney, Douglas R.; Lynch, Sharon G.

2003-03-01T23:59:59.000Z

50

Requirements for Using and Administering Cost-plus-award-fee Contracts:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements for Using and Administering Cost-plus-award-fee Contracts: Requirements for Using and Administering Cost-plus-award-fee Contracts: Pre and Post FAC 2005-37 Pre FAC 2005-37 Prior to Federal Acquisition Circular (FAC) 2005-37, which has an effective date of October 14, 2009, the Federal Acquisition Regulation (FAR) required the following in using and administering a cost-plus-award-fee contract: 1. neither a firm-fixed-price nor a fixed-priced incentive contract was appropriate; 2. the limitations on use of a cost reimbursement contract were met; 3. the supplies or services could be acquired at lower costs, and in certain instances, with improved delivery or technical performance, by relating the amount of fee to the contractor's performance; 4. it was neither feasible nor effective to use predetermined objective incentive targets for cost,

51

Comparative Performance Analysis of the Algorithms for Detecting Periodically Expressed Genes  

E-Print Network (OSTI)

. : : : : : : : 36 9 Performance comparison based on Alpha arrest data set. : : : : : : : 37 1 CHAPTER I INTRODUCTION1 Biological processes undergo rhythms that are dictated by various cell activities such as the cell cycle process. This phenomenon recur..." by Zhao, W. and Agyepong, K. and Serpedin, E. and Dougherty, E.R., vol.2008, EURASIP Journal on Bioinformatics and Systems Biology, 2008, Copyright 2008 by Zhao and Agyepong and Serpedin and Dougherty. 2 and the inability of microarrays to cipher non...

Agyepong, Kwadwo

2012-10-19T23:59:59.000Z

52

Alternative Fuels Data Center: Electric Vehicle (EV) Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fee to someone by E-mail Fee to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Electric Vehicle (EV) Fee EV operators must pay an annual vehicle registration renewal fee of $100. This fee expires if the legislature imposes a vehicle miles traveled fee or

53

Water Pollution Fee (Michigan) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Pollution Fee (Michigan) Water Pollution Fee (Michigan) Water Pollution Fee (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Michigan Program Type Fees Siting and Permitting Provider Department of Environmental Quality The Groundwater Program regulates discharge to groundwater under Part 31, Water Resources Protection, of the Natural Resources and Environmental Protection Act, 1994 PA 451 and Part 22 Rules. Groundwater staff review

54

UCOR Contract & Fee Determination | Department of Energy  

Energy Savers (EERE)

Contract & Fee Determination The attached document is UCOR's conformed contract with the Oak Ridge Office of Environmental Managment. It is contract DE-SC0004645, and it includes...

55

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain...  

Office of Environmental Management (EM)

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's...

56

"MBUF Demo" "Mn Road Fee Test"  

E-Print Network (OSTI)

(40 mpg) Electric Vehicle (non-gas powered) State Tax * Federal Tax ** State Tax * Federal Tax"MBUF Demo" "Mn Road Fee Test" "IntelliDrive Connected Vehicles for Safety, Mobility and User Fee Overview Six Months In-Vehicle Data Collection Participant Recruited Equipment Deployed First Odometer

Minnesota, University of

57

WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE DOE F 4220.23 (06-95) U.S. DEPARTMENT OF ENERGY 1. CONTRACTOR IDENTIFICATION 2. TYPE OF ACQUISTION ACTION (REFER TO OFPP MANUAL, FEDERAL PROCUREMENT DATA SYSTEMS - PRODUCT AND SERVICE CODES. APRIL 1980) a. Name c. Street address b. Division (If any) d. City e. State f. Zip code a. SUPPLIES & EQUIPMENT b. RESEARCH & DEVELOPMENT c. SERVICES: (1) ARCHITECT-ENGINEER: (2) MANAGEMENT SERVICES: (3) MEDICAL: (4) OTHER (e.g., SUPPORT SERVICES) 3. ACQUISITION INFORMATION a. Purchasing Offices b. Contract type d. FY c. RFP/RFQ No. e. Contract No. PROFIT/FEE OBJECTIVE COMPUTATION PROFIT/FEE CONSIDERATIONS a. MEASUREMENT BASE b. PROFIT/FEE WEIGHT RANGES (%) c. ASSIGNED

58

Water Use Fees (Wisconsin) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Use Fees (Wisconsin) Water Use Fees (Wisconsin) Water Use Fees (Wisconsin) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Program Info Start Date 2011 State Wisconsin Program Type Fees Provider Department of Natural Resources Annual $125 water use fees are charged by the State of Wisconsin to each property that has the capacity to withdraw 100,000 gallons per day or more

59

NNSA Strategic Performance Evaluation Plan (PEP) FOR  

National Nuclear Security Administration (NNSA)

Management and Operation of the Management and Operation of the Babcock and Wilcox Technical Services Y-12, LLC Contract Number: DE-ACOS-OOOR22800 Performance period: October 01, 2012 through September 30, 2013 . Spencer Date President and General Manager Babcock & Wilcox Technical Services Y-12, LLC jO/~ nag , Contracts & Special Initiatives ck & Wilcox Technical Services Y -12, LLC National Nuclear Security Administration INTRODUCTION Y-12 National Security Complex is managed by Babcock & Wilcox Technical Services Y-12, LLC, herein referenced as "Contractor", for the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA). Pursuant to the terms and conditions of the Contract, and Clause 1.154 DEAR 970.5215-1 Total Available Fee: Base Fee Amount and Performance

60

DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS  

E-Print Network (OSTI)

, VMT fee, data processing, fuel tax alternatives, fee collection center, customer service center 18DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS by Robert L. Bertini Kerri-based fee collection centers, including the identification of issues related to data transmission, data

Bertini, Robert L.

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Alternative Fuels Data Center: Fleet User Fee Exemption  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fleet User Fee Fleet User Fee Exemption to someone by E-mail Share Alternative Fuels Data Center: Fleet User Fee Exemption on Facebook Tweet about Alternative Fuels Data Center: Fleet User Fee Exemption on Twitter Bookmark Alternative Fuels Data Center: Fleet User Fee Exemption on Google Bookmark Alternative Fuels Data Center: Fleet User Fee Exemption on Delicious Rank Alternative Fuels Data Center: Fleet User Fee Exemption on Digg Find More places to share Alternative Fuels Data Center: Fleet User Fee Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fleet User Fee Exemption Fleets with 10 or more vehicles located in defined areas of the state must pay an annual user fee of $20 per vehicle. Owners of electric vehicles and

62

Nuclear Waste Fund fee adequacy: An assessment  

SciTech Connect

The purpose of this report is to present the Department of Energy`s (the Department) analysis of the adequacy of the 1.00 mill per kilowatt-hour (kWh) fee being paid by the utilities generating nuclear power for the permanent disposal of their spent nuclear fuel (SNF). In accordance with the Nuclear Waste Policy Act (NWPA), the SNF would be disposed of in a geologic repository to be developed by the Department. An annual analysis of the fee`s adequacy is required by the NWPA.

NONE

1990-11-01T23:59:59.000Z

63

Annual Emission Fees (Michigan) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Emission Fees (Michigan) Annual Emission Fees (Michigan) Annual Emission Fees (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Michigan Program Type Fees Provider Department of Environmental Quality The Renewable Operating Permit (ROP) is required by Title V of the Clean Air Act Amendments of 1990. The ROP program clarifies the requirements that apply to a facility that emits air contaminants. Any facility in Michigan

64

Sacramento Ordinance to Waive Solar PV Fees  

Energy.gov (U.S. Department of Energy (DOE))

This is an ordinance by the city of Sacramento to suspend for the calendar years 2007-2009 all fees related to installation of photovoltaic systems on existing residences.

65

Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Inefficient Fuel Inefficient Vehicle Fee to someone by E-mail Share Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Facebook Tweet about Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Twitter Bookmark Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Google Bookmark Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Delicious Rank Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Digg Find More places to share Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fuel Inefficient Vehicle Fee New passenger vehicles meeting one of the following criteria are subject to an additional fee payable to the New Jersey Motor Vehicle Commission:

66

Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle (EV) Electric Vehicle (EV) Registration Fee to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Electric Vehicle (EV) Registration Fee The annual registration fee for an EV is $25.00 unless the vehicle is more

67

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Annual Fee to someone by E-mail Annual Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) Annual Fee Owners of compressed natural gas and propane powered vehicles are required

68

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT This Fiscal Year 2008 Civilian Radioactive Waste Management Fee Adequacy Letter Report presents an evaluation of the adequacy of the one mill per kilowatt-hour fee paid by commercial nuclear power generators for the permanent disposal of their spent nuclear fuel by the Government. This evaluation recommends no fee change. CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT More Documents & Publications FY 2007 Fee Adequacy, Pub 2008 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear

69

Alternative Fuels Data Center: Ethanol Production Facility Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Production Ethanol Production Facility Fee to someone by E-mail Share Alternative Fuels Data Center: Ethanol Production Facility Fee on Facebook Tweet about Alternative Fuels Data Center: Ethanol Production Facility Fee on Twitter Bookmark Alternative Fuels Data Center: Ethanol Production Facility Fee on Google Bookmark Alternative Fuels Data Center: Ethanol Production Facility Fee on Delicious Rank Alternative Fuels Data Center: Ethanol Production Facility Fee on Digg Find More places to share Alternative Fuels Data Center: Ethanol Production Facility Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Production Facility Fee The cost to submit an air quality permit application for an ethanol production plant is $1,000. An annual renewal fee is also required for the

70

Office of Inspector General report on audit of Department of Energy management and operating contractor available fees  

SciTech Connect

The Office of Procurement and Assistance Management has proposed changes to the method used to annually calculate and negotiate ``for profit`` management and operating contractor available fees. This proposal will increase contractor fees in exchange for the contractor`s purported assumption of additional risk. In 1991, the Department, through the Accountability Rule, increased contractor fees as an incentive to improve contractor performance and accountability. Despite the lack of measurable benefits of this effort, the Department is crafting a new fee policy which will, depending upon how it is executed, increase fees above the amount provided through the Accountability Rule as an incentive to the Department`s management and operating contractors. The objective of the audit was to determine whether the Department`s proposed change to the fee structure for determining management and operating contractor fees will be cost effective. This report describes the study`s approach, its findings and recommendations, management and auditor comments, and includes appendices with further data.

NONE

1996-05-01T23:59:59.000Z

71

Water pollution Control Permit Fee Schedules (West Virginia) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

pollution Control Permit Fee Schedules (West Virginia) pollution Control Permit Fee Schedules (West Virginia) Water pollution Control Permit Fee Schedules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Siting and Permitting Provider Department of Environmental Protection This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national

72

FY 2007 Fee Adequacy, Pub 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fee Adequacy, Pub 2008 The purpose of this U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of...

73

Alternative Fuels Data Center: Alternative Fuels Tax or Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuels Tax Alternative Fuels Tax or Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuels Tax or Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuels Tax or Fee A state excise tax applies to special fuels at a rate of $0.25 per gallon on a gasoline gallon equivalent basis. Special fuels include compressed

74

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuel Alternative Fuel Vehicle (AFV) User Fee Study to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) User Fee Study

75

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Parking Fee Exemption to someone by E-mail Parking Fee Exemption to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

76

UCF TECHNOLOGY FEE GUIDELINES Academic Year 2013-2014  

E-Print Network (OSTI)

UCF TECHNOLOGY FEE GUIDELINES Academic Year 2013-2014 The 2007 Florida Legislature amended Florida Statutes, Section 1009.24, to establish "a technology fee of up to 5 percent of the tuition per credit hour to enhance instructional technology resources for students and faculty." UCF TECHNOLOGY FEE COMMITTEE Revenue

Foroosh, Hassan

77

DEVELOPMENT IMPACT FEE ADOPTION AND ITS EFFECTS IN TEXAS  

E-Print Network (OSTI)

The purpose of my thesis is to study what factors affect the adoption of impact fees in Texas and what effects impact fees have on city budgets. This research was done using two models. The first model looked at the adoption of impact fees...

Ambs, Jonathan G.

2010-01-20T23:59:59.000Z

78

Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle (EV) Electric Vehicle (EV) Registration Fee Reduction to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

79

Appendix D - Federal Highway User Fees  

NLE Websites -- All DOE Office Websites (Extended Search)

D - FEDERAL HIGHWAY USER FEES D - FEDERAL HIGHWAY USER FEES FEDERAL HIGHWAY-USER FEES 1/ OCTOBER 2001 TABLE FE-21B USER FEE TAX RATE DISTRIBUTION OF TAX EFFECTIVE DATE HIGHWAY TRUST FUND LEAKING UNDER- GROUND STORAGE TANK TRUST FUND GENERAL FUND HIGHWAY ACCOUNT MASS TRANSIT ACCOUNT Fuel Taxes (Cents per Gallon) Gasoline 18.3 01/01/96 12 2 - 4.3 18.4 10/01/97 15.44 2.86 0.1 - Diesel and Kerosene fuel 24.3 01/01/96 18 2 - 4.3 24.4 10/01/97 21.44 2.86 0.1 - Special fuels 2/ 3/ 18.3 01/01/96 12 2 - 4.3 Liquefied Petroleum Gas 13.6 10/01/97 11.47 2.13 - - Liquefied Natural Gas 11.9 10/01/97 10.04 1.86 - - Other Special Fuels 18.4 10/01/97 15.44 2.86 0.1 - Neat alcohol (85% alcohol) 3/ 4/ 9.25 10/01/97 7.72 1.43 0.1 - Compressed natural gas 5/ 4.3 10/01/93 - - - 4.3

80

Special Fees Help Document Updated 8/23/12 Page 1 of 9  

E-Print Network (OSTI)

Special Fees Help Document ­ Updated 8/23/12 Page 1 of 9 Special Fees Request Form Help Document Affairs ­ Special Fee Forms section, select add new. #12;Special Fees Help Document ­ Updated 8/23/12 Page. Click Next to continue. #12;Special Fees Help Document ­ Updated 8/23/12 Page 3 of 9 Complete the course

Farritor, Shane

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

City of Asheville - Building Permit Fee Waiver | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 7/01/2009 State North Carolina Program Type Green Building Incentive Provider Building Safety Department The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings. Waivers for building permit fees may apply to residences with the following designations (the regular fee is in parentheses): * HealthyBuilt Home Certification* ($100) * Energy Star Rating ($100) * Geothermal heat pumps ($50)

82

Privacy Act Fees and Time Limits | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Fees and Time Limits | National Nuclear Security Administration Fees and Time Limits | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Privacy Act Fees and Time Limits Home > About Us > Our Operations > NNSA Office of General Counsel > Privacy Act (PA) of 1974 > Privacy Act Fees and Time Limits Privacy Act Fees and Time Limits The Act provides agencies to assess fees only for the cost of reproducing

83

Federal Court Dismisses Waste Fee Challenges | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Court Dismisses Waste Fee Challenges Federal Court Dismisses Waste Fee Challenges Federal Court Dismisses Waste Fee Challenges December 13, 2010 - 2:31pm Addthis The D.C. Circuit today dismissed petitions filed by the National Association of Regulatory Utility Commissioners (NARUC) and other entities seeking (1) to force the Department to issue an assessment of the adequacy of the nuclear waste fund fee and (2) compelling suspension of the fee. These petitions were filed before the Department's recent issuance of a new fee assessment, and, in that context, the court determined that the petitions were moot and unripe. The court's order can be found here. Addthis Related Articles NARUC Releases Cybersecurity Primer for Utility Regulators (June 2012) DOE Does Not Oppose Petitions to Intervene in Yucca Mountain NRC Proceeding

84

ETH-Bibliothek Fees ETH staff and doc-toral students with  

E-Print Network (OSTI)

additional: 5.­ 1-2 images: 20.­ each additional: 10.­ Publication and royalty fees Copies (PDF) per page fees and royalty fees free of charge free of charge free of charge ex publication: 20

Gilli, Adrian

85

Rules and Regulations Governing the Establishment of Various Fees (Rhode  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Establishment of Various Fees the Establishment of Various Fees (Rhode Island) Rules and Regulations Governing the Establishment of Various Fees (Rhode Island) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Rhode Island Program Type Siting and Permitting Provider Department of Environmental Management These regulations describe the fees associated with several Department of Environmental Management regulatory programs, including programs pertaining

86

Microsoft Word - Award Fee Determination Scorecard for FY 2013...  

NLE Websites -- All DOE Office Websites (Extended Search)

(81.1%) Award Fee Area Adjectival Ratings: Functional Element Adjectival Rating* Conduct of Operations Very Good General Management Very Good -Contract Administration and...

87

Fees For Disposal Of Hazardous Waste Or Substances (Alabama)  

Energy.gov (U.S. Department of Energy (DOE))

The article lists annual payments to be made to counties, restrictions on disposal of hazardous waste, additional fees collected by counties and penalties.

88

Sacramento Ordinance to Waive Fees for Solar Hot Water  

Energy.gov (U.S. Department of Energy (DOE))

An ordinance suspending for the calendar years 2007-2009 all fees related to installations of solar water heaters on existing residences.

89

Alaska Division of Water Permit Fees | Open Energy Information  

Open Energy Info (EERE)

Web Site: Alaska Division of Water Permit Fees Author Alaska Division of Water Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for DOI availability:...

90

Sandia National Laboratories: User Fees for NSTTF Capabilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Capabilities * NSTTF User Fees * Optics Lab * rotating platform * solar * Solar Energy * Solar Furnace * solar power * Solar Research * Solar Tower Comments are closed. Last...

91

Fuel-conservation evaluation of US Army helicopters. Part 6. Performance calculator evaluation. Final report for period ending January 1981  

SciTech Connect

The US Army Aviation Engineering Flight Activity conducted an evaluation of Flight Management Calculator for the UH-1H. The calculator was a Hewlett-Packard HP-41CV. The performance calculator was evaluated for flight planning and in-flight use during 14 mission flights simulating operational conditions. The calculator was much easier to use in-flight than the operator's manual data. The calculator program needs improvement in the areas of pre-flight planning and execution speed. The mission flights demonstrated a 19% fuel saving using optimum over normal flight profiles in warm temperatures (15/sup 0/C above standard). Savings would be greater at colder temperatures because of increasing compressibility effects. Acceptable accuracy for individual aircraft under operational conditions may require a regressive analog model in which individual aircraft data are used to update the program. The performance data base for the UH-1H was expanded with level flight and hover data to thrust coefficients and Mach numbers to the practical limits of aircraft operation.

Dominick, F.; Lockwood, R.A.

1986-07-01T23:59:59.000Z

92

A computerized student fee system for Texas A&M University  

E-Print Network (OSTI)

options 12 12 15 3. 2 Initial f e assessment 3. 3 Fee update procedures 18 3. 3. 1 Normal fee revisions 3. 3. 2 Drop/add fee revisions 3. 3. 3 Processing fee payments 4. S UMK4R Y REFERENCES 21 23 25 26 30 APPENDIX A Program Operating..., but the production of revised fee state- ments is postponed until after the twelfth class day. 3. $. 2 Dro add fee revisions. Other fee revisions are made neces- sary by the student's adding and/or dropping of courses after the original schedule and fee statement...

Wood, Lester Seth

2012-06-07T23:59:59.000Z

93

Enumeration of Juvenile Salmonids in the Okanogan Basin Using Rotary Screw Traps, Performance Period: March 15, 2006 - July 15, 2006.  

SciTech Connect

The Colville Tribes identified the need for collecting baseline census data on the timing and abundance of juvenile salmonids in the Okanogan River basin for the purpose of documenting local fish populations, augmenting existing fishery data and assessing natural production trends of salmonids. This report documents and assesses the pilot year of rotary trap capture of salmonid smolts on the Okanogan River. The project is a component of the Colville Tribes Okanogan Basin Monitoring and Evaluation Program (OBMEP) which began in 2004. Trapping for outmigrating fish began on 14 March 2006 and continued through 11 July 2006. Anadromous forms of Oncorhynchus, including summer steelhead (O. mykiss), Chinook (O. tshawytscha), and sockeye (O. nerka), were targeted for this study; all have verified, natural production in the Okanogan basin. Both 8-ft and 5-ft rotary screw traps were deployed on the Okanogan River from the Highway 20 Bridge and typically fished during evening hours or 24 hours per day, depending upon trap position and discharge conditions. Juvenile Chinook salmon were the most abundant species trapped in 2006 (10,682 fry and 2,024 smolts), followed by sockeye (205 parr and 3,291 smolts) and steelhead (1 fry and 333 smolts). Of the trapped Chinook, all fry were wild origin and all but five of the smolts were hatchery-reared. All trapped sockeye were wild origin and 88% of the steelhead smolts were hatchery-reared. Mark-recapture experiments were conducted using Chinook fry and hatchery-reared steelhead smolts (sockeye were not used in 2006 because the peak of the juvenile migration occurred prior to the onset of the mark-recapture experiments). A total of 930 chinook fry were marked and released across eight separate release dates (numbers of marked Chinook fry released per day ranged from 34 to 290 fish). A total of 11 chinook fry were recaptured for an overall trap efficiency of 1.18%. A total of 710 hatchery-reared steelhead were marked and released across three separate release dates (numbers of steelhead released per day ranged from 100 to 500 fish). A total of 12 steelhead were recaptured for an overall trap efficiency of 1.69%. A pooled Peterson estimator with a Chapman modification was used to produce population estimates for wild Chinook fry and hatchery-reared steelhead based on the results of the mark-recapture experiments. The 2006 populations for Chinook and steelhead were estimated to be 381,554 (95% confidence intervals: 175,731-587,377) and 14,164 (6,999-21,330), respectively. The population estimates were based on the periods in which mark-recapture experiments were initialized through the end of the trapping season (10 May for steelhead and 1 June for Chinook).

Johnson, Peter N.; Rayton, Michael D.

2007-05-01T23:59:59.000Z

94

Colorado School of Mines 1 Tuition, Fees, Financial  

E-Print Network (OSTI)

Colorado School of Mines 1 Tuition, Fees, Financial Assistance, Housing & Dining Rates 2014-2015 Tuition and fees are established by the Board of Trustees of Colorado School of Mines following the annual budget process and action by the Colorado General Assembly and Governor. Undergraduate Tuition

95

Student Action Committee Report on the Student Comprehensive Fee  

E-Print Network (OSTI)

1 Student Action Committee Report on the Student Comprehensive Fee April, 2010 #12;2 Table:................................................................................................................15 #12;3 Executive Summary: The SGA formally adopted a definition of the Student Comprehensive Fee requiring that all sections support specific services and facilities accessible to all current students

Hayden, Nancy J.

96

Air Pollution Control Fees (Ohio) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Pollution Control Fees (Ohio) Air Pollution Control Fees (Ohio) Air Pollution Control Fees (Ohio) < Back Eligibility Utility Agricultural Investor-Owned Utility State/Provincial Govt Construction Municipal/Public Utility Local Government Rural Electric Cooperative Program Info State Ohio Program Type Environmental Regulations Fees Provider Ohio Environmental Protection Agency Facilities with a potential to emit any one regulated air pollutant of a quantity greater than or equal to 100 tons per year, or any one hazardous air pollutant (HAP) greater than or equal to 10 tons per year, or any combination of hazardous air pollutants greater than 25 tons per year, must submit, in a form and manner prescribed by the director, a fee emission report that quantifies the actual emission data for particulate matter,

97

Underground Injection Control Fee Schedule (West Virginia) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Injection Control Fee Schedule (West Virginia) Injection Control Fee Schedule (West Virginia) Underground Injection Control Fee Schedule (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Provider Department of Environmental Protection This rule establishes schedules of permit fees for state under-ground injection control permits issued by the Chief of the Office of Water Resources. This rule applies to any person who is required to apply for and

98

Local Option - Building Permit Fee Waivers for Renewable Energy Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Local Option - Building Permit Fee Waivers for Renewable Energy Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government General Public/Consumer Industrial Installer/Contractor Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Connecticut Program Type Solar/Wind Permitting Standards Provider Department of Energy and Environmental Protection As of July 2011, Connecticut authorizes municipalities to pass a local

99

Cost-share Fee Waiver request form Request for a cost share for a GSSP fee waiver on the following project. Documentation from granting  

E-Print Network (OSTI)

Cost-share Fee Waiver request form Request for a cost share for a GSSP fee waiver on the following project. Documentation from granting agency with information regarding tuition as unallowable must____________________________________________________________ Project Name __________________________________________________________________ Funding Agency

Taylor, Jerry

100

City of Riverhead - Energy Conservation Device Permitting Fees | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 07/01/2005 (retroactive) State New York Program Type Green Building Incentive Provider Building Department In 2006 the Town of Riverhead on Long Island enacted a special allowance in its building permit fee structure to provide a discount to people wishing to install energy conservation devices on residential or commercial buildings. The provision in the town code applies to any energy conservation device "installed in or on a structure which qualifies for any federal, state or local tax exemption, tax credit or tax rebate", but

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Property Tax Fee-In-Lieu (Mississippi) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Property Tax Fee-In-Lieu (Mississippi) Property Tax Fee-In-Lieu (Mississippi) Property Tax Fee-In-Lieu (Mississippi) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Mississippi Program Type Property Tax Incentive Provider Mississippi Department of Revenue The Property Tax Fee-In-Lieu allows for new or expansion projects in the

102

Small Business Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration (SBA) Guarantee Fee Tax Credit Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) Small Business Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) < Back Eligibility Agricultural Commercial Construction Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Oklahoma Program Type Corporate Tax Incentive Provider Small Business Administration The Small Business Administration (SBA) Guarantee Fee Tax Credit allows for small businesses operating in Oklahoma to claim a credit against income tax liability. This credit may be claimed for tax year 2012 and subsequent tax

103

D235 (8-11) Patient Copy Fee Agreement  

E-Print Network (OSTI)

): _______________________________________________ For credit card billing: r VISA r M/C Credit card #: Expiration Date: Name on credit card: Credit card billing address: (Please note: sales tax and applicable postage will be added to total fee.) #12;

Squire, Larry R.

104

Idaho Water Right Applications, Forms, and Fees Webpage | Open...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho Water Right Applications, Forms, and Fees Webpage Abstract This webpage provides an overview...

105

Solid Waste Assessment Fee Exemptions (West Virginia) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solid Waste Assessment Fee Exemptions (West Virginia) Solid Waste Assessment Fee Exemptions (West Virginia) Solid Waste Assessment Fee Exemptions (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Rebate Program A person who owns, operates, or leases an approved solid waste disposal facility is exempt from the payment of solid waste assessment fees, upon the receipt of a Certificate of Exemption from the director, if that

106

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

and Fee to someone by E-mail and Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) Tax and Fee Compressed natural gas (CNG) used in motor vehicles is subject to a state

107

H.__ PERFORMANCE EVALUATION AND MEASUREMENT PLAN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PERFORMANCE EVALUATION AND MEASUREMENT PLAN PERFORMANCE EVALUATION AND MEASUREMENT PLAN (a) The determination of performance-based fee earned shall be based upon a Performance Evaluation and Measurement Plan (PEMP), which includes the performance criteria for earning performance-based fee and the distribution of performance-based fee as provided in paragraph (d) below. The PEMP will be unilaterally established by the Government. A copy of the plan shall be provided to the Contractor with approval of the Contract Baseline. Both the PEMP and the approved Contract Baseline are hereby incorporated by reference. (b) Key performance commitments proposed by the Contractor and accepted by the Government are incorporated into Section H clause entitled "Performance Requirements" and will be included in the performance criteria in the PEMP.

108

Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of the adequacy of the fee being paid by nuclear power utilities...

109

Licensing Uncertain Patents: Per-Unit Royalty vs. Up-Front Fee  

E-Print Network (OSTI)

Licensing Uncertain Patents: Per-Unit Royalty vs. Up-Front Fee David Encaouay and Yassine Lefouiliz schemes are investigated: the per-unit royalty rate and the up-front fee. We provide conditions under-unit royalty scheme, the opportunity to do so does not exist under the up-front fee scheme. We also establish

Boyer, Edmond

110

Contract No. DE-AC27-OIRV14136  

NLE Websites -- All DOE Office Websites (Extended Search)

under Contract Clause B.7, Award Fee Determination, and is applicable to the Performance Evaluation and Measurement Plan (PEMP) determination made for Award Fee Period 2011 -A....

111

Award Fee Determination Scorecard Contractor: Washington River...  

NLE Websites -- All DOE Office Websites (Extended Search)

Tank (DST) System Excellent SEA 2: Performance of Tank Farms Project Operations - Conduct of Operations Very Good SEA 3: Cost Performance Very Good SEA 4: Quality Assurance...

112

GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions February 26, 2010 - 3:17pm Addthis Consistent with the Administration's commitment to transparency, DOE General Counsel Scott Blake Harris has decided that all future determinations as to the adequacy of the Nuclear Waste Fund fee will be made available to the public on DOE's website shortly after DOE makes a determination. The report relied upon in determining fee adequacy for 2008, the most recent year for which DOE has made a determination, is available here: (2008 Fee Adequacy Letter Report). Addthis Related Articles DOE Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee Department of Energy Files Motion to Withdraw Yucca Mountain License

113

Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduced Registration Reduced Registration Fee for Fuel-Efficient Vehicles to someone by E-mail Share Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Facebook Tweet about Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Twitter Bookmark Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Google Bookmark Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Delicious Rank Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Digg Find More places to share Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on AddThis.com... More in this section... Federal State Advanced Search

114

Equity Evaluation of Vehicle Miles Traveled Fees in Texas  

E-Print Network (OSTI)

to the infrastructure but the money needed to maintain and improve roadways is not being adequately generated. One proposed alternative to the gas tax is the creation of a vehicle miles traveled (VMT) fee; with equity being a crucial issue to consider. This research...

Larsen, Lisa Kay

2012-10-19T23:59:59.000Z

115

University Fees & Financial Planning for Parents and Families  

E-Print Network (OSTI)

, part-time school year, on campus work-study U of T Grants UTAPS, UTM Grant helpful hint: apply) $5,865* $5,865* Incidental Fees $1,365* $1,365* Books/School Supplies $1,000 $1,000 Rent range from approximately $9960 - $13863 (2013-14). · Bioinformatics · Commerce, Management · Computer

Sokolowski, Marla

116

THE UNIVERSITY OF HONG KONG Payment of Application Fee  

E-Print Network (OSTI)

: "06" Other Fees 4) Enter Bill Account Number: For HSBC / Hang Seng Bank / JETCO: 20999999834001 5 of the following websites: HSBC hsbc.com.hk> Hang Seng Bank JETCO the account transfer function for payment) HSBC: View and Pay Bills Hang Seng Bank: View and Pay Bills JETCO

Tam, Vincent W. L.

117

Federal Register /'Vol. 51, No. 243 / Thursday, December 18, 1986 / Proposed Rules fees. Only two fee items on the 1984  

E-Print Network (OSTI)

Federal Register /'Vol. 51, No. 243 / Thursday, December 18, 1986 / Proposed Rules fees. Only two of the Secretary, Room 2215, Interstate Commerce Commission Building, Washington, DC 20423 or call (202) 275- 7428 of energy nor should it have a significant effect on a substantial number of small entities. List

118

1. Preconstruction Phase Payments Preconstruction Phase fees are negotiated as a lump sum amount, with fees being associated with individual  

E-Print Network (OSTI)

, if any), and are to be submitted to the Facilities Design and Construction Office (FDC). If any by the schedule of values. Fee and General Conditions Pay Request Documentation: a) The overhead and profit in writing from the FSU project manager. Line item amounts from the GMP for salaries shall not be exceeded

Sura, Philip

119

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Fee Determinations: Requirement to Obtain 4 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Attached is Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. POLICY_FLASH_2013-24 disseminating the Dep Sec's memo of Jan 28 2013 on Fee Determ and AEs.pdf Fee Determinations - Requirement to Obtain Acquisition Executive's Input.pdf More Documents & Publications Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule

120

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Fee Determinations: Requirement to Obtain 4 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Attached is Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. POLICY_FLASH_2013-24 disseminating the Dep Sec's memo of Jan 28 2013 on Fee Determ and AEs.pdf Fee Determinations - Requirement to Obtain Acquisition Executive's Input.pdf More Documents & Publications Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security...  

Open Energy Info (EERE)

Abstract These regulations outline the requirements for fees and financial security with the Oil and Gas Division of the Railroad Commission of Texas. Published NA...

122

Recreation Pool Hours and Availability for Rochester INDIVIDUAL GUEST FEES WILL APPLY AT FACILITIES LISTED  

E-Print Network (OSTI)

Recreation Pool Hours and Availability for Rochester INDIVIDUAL GUEST FEES WILL APPLYSp_aquatic.pdf Perinton http://www.perinton.org/Departments/Recreation/PCC Pittsford Pages 1012 http

Portman, Douglas

123

Data:7322b2fe-026b-400a-895f-ee3d34e4f43d | Open Energy Information  

Open Energy Info (EERE)

fe-026b-400a-895f-ee3d34e4f43d fe-026b-400a-895f-ee3d34e4f43d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Concord, North Carolina (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: General Service- Time of Use Sector: Commercial Description: Available only to non-residential loads with a demand greater than or equal to 100 kW during at least three months of a twelve-month period and an average annual load factor of at least 55%. Service under this Schedule should be used for a Customer with a single enterprise located entirely on a single, contiguous premise.

124

Data:72aa8b97-f6b5-4fee-bd62-cdc29548ae0b | Open Energy Information  

Open Energy Info (EERE)

f6b5-4fee-bd62-cdc29548ae0b f6b5-4fee-bd62-cdc29548ae0b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Cashton, Wisconsin (Utility Company) Effective date: 2009/02/15 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 40 kilowatts for three or more months in a consecutive 12-month period.

125

Variability in natural gas fuel composition and its effects on the performance of catalytic combustion systems. Final report for period September 18, 1998 - September 17, 2000  

SciTech Connect

Natural gas is composed primarily of methane with small amounts of higher hydrocarbons and diluents, which vary by region and over time. Compositions of natural gas from domestic and worldwide sources were surveyed with respect to content of higher hydrocarbons and diluents. The survey showed slight compositional variability between most of the gases, with a small fraction of them containing significantly larger contents of higher hydrocarbons than the mean. As gas-fired turbines will be used for power generation all over the world, they will need to tolerate operation with fuels with a wide variety of compositions, particularly with respect to the concentration of higher hydrocarbons and diluents. Subscale catalytic combustion modules typical of those used in gas turbine power generation with ultra low emissions of pollutants were tested in a subscale test system with natural gas alone and with added known levels of hydrocarbon compounds and diluents. The range of compositions tested contained the range observed in the survey. Test results were used to calculate the effect of composition on catalyst performance. The compositional variability is of little consequence to the catalyst for most of the gases in the survey, including nearly all of the gases delivered in the U.S. To accommodate the remaining gases, the catalyst inlet temperature must be lowered to maintain combustor durability. These results support commercial acceptance of catalytic combustion systems for use in natural gas fired turbines in distributed power generation with ultra low NO{sub x} emissions.

Ginter, David; Simchick, Chuck; Schlatter, Jim

2002-03-01T23:59:59.000Z

126

Proposals for Technology Innovation Projects Student technology fees are intended to enhance student learning and the student  

E-Print Network (OSTI)

Proposals for Technology Innovation Projects Student technology fees Technology Committee is allocating a portion of the student technology fees received technology in this context. The committee is particularly looking for projects that

Farritor, Shane

127

Per-Unit Royalty vs Fixed Fee: The Case of Weak Patents  

E-Print Network (OSTI)

Per-Unit Royalty vs Fixed Fee: The Case of Weak Patents Rabah Amiry David Encaouaz Yassine a per-unit royalty or a ...xed fee when her innovation is covered by a weak patent, i.e. a patent of competition is not speci...ed, we show that the patent holder prefers to use a per-unit royalty scheme

Paris-Sud XI, Université de

128

ABOUT CALENDAR FEES ENROLLMENT RECORDS University Home MyUCSC People Calendars A-Z Index  

E-Print Network (OSTI)

ABOUT CALENDAR FEES ENROLLMENT RECORDS University Home MyUCSC People Calendars A-Z Index OFFICE to scholars who have not completed their own search for knowledge, meaning, and understanding CALENDAR FEES ENROLLMENT RECORDS University Home MyUCSC People Calendars A-Z Index OFFICE OF THE REGISTRAR

California at Santa Cruz, University of

129

Fee Waiver and Reduction Criteria | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Fee Waiver and Reduction Criteria Fee Waiver and Reduction Criteria Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Advisory Exemptions How to Submit a FOIA Request Fee Waiver and Reduction Criteria Electronic Reading Room ISC Conventional Reading Rooms Reference Links Privacy Act Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Freedom of Information Act (FOIA) Fee Waiver and Reduction Criteria Print Text Size: A A A RSS Feeds FeedbackShare Page The FOIA generally requires that requesters pay fees for processing their requests. In accordance with 5 U.S.C 552(a)(4)(A)(iv), an agency is

130

Fees and rebates on new vehicles: Impacts on fuel efficiency, carbon dioxide emissions, and consumer surplus  

Science Journals Connector (OSTI)

Several incentive systems are examined that provide rebates on vehicles with higher-than-average fuel efficiency and levy fees on vehicles with less efficiency. The rebates and fees are applied to new vehicles at the time of purchase, and the rates are set such that the total outlay for rebates equals the revenues from fees. We find that moderately-sized rebates and fees result in a substantial increase in average fuel efficiency. Most of the effect is due to manufacturers' incorporating more fuel-efficiency technologies into the vehicles that they offer, since the rebates and fees effectively lower the price to manufacturers of these technologies. Consumer surplus is found to rise, and the profits of domestic manufacturers are estimated to drop only slightly under most systems and actually to rise under one system.

Kenneth E. Train; William B. Davis; Mark D. Levine

1997-01-01T23:59:59.000Z

131

Please complete the following information, check the meeting date you plan to attend, and return, along with $15 registration fee (checks or money order only), via mail  

E-Print Network (OSTI)

, along with $15 registration fee (checks or money order only), via mail to: Brittany Dittemore Headwaters

Guiltinan, Mark

132

City of Tucson - Permit Fee Credit for Solar Energy Systems | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Tucson - Permit Fee Credit for Solar Energy Systems City of Tucson - Permit Fee Credit for Solar Energy Systems City of Tucson - Permit Fee Credit for Solar Energy Systems < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State Arizona Program Type Green Building Incentive Provider City of Tucson The City of Tucson passed Resolution No. 20193 on September 27, 2005, to encourage the installation of solar energy systems throughout the city. The resolution established a policy whereby the director of the Department of Planning and Development Services will waive the fee paid by an applicant for a permit for the installation of a qualifying solar system up to $1,000 for a single installation, or $5,000 for a subdivision or multiple project

133

Title 46 Alaska Statutes Section 03.385 Registration Fee for...  

Open Energy Info (EERE)

Registration Fee for Registration of Tanks and Tank Systems Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 46 Alaska...

134

FY 12 Award Fee Determination Scorecard Contractor: B&W Conversion...  

NLE Websites -- All DOE Office Websites (Extended Search)

Fee The first PBI was based on the state of readiness of the Paducah and Piketon Depleted Uranium Hexafluoride (DUF 6 ) conversion plants as of September 30, 2011. BWCS met...

135

PARS II Process Document - DOE Period Close | Department of Energy  

Office of Environmental Management (EM)

by the Office of Acquisition and Project Management to prepare APM DepSec Monthly Status Report, finalize DOE close period package, and perform reporting period close...

136

ISSUES REGARDING FEE STRUCTURE FOR THREE ENVIRONMENTAL MANAGEMENT CONTRACTS, CR-B-01-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CR-B-01-01 CR-B-01-01 AUDIT REPORT ISSUES REGARDING FEE STRUCTURE FOR THREE ENVIRONMENTAL MANAGEMENT CONTRACTS MAY 2001 U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES DEPARTMENT OF ENERGY Washington, DC 20585 May 9, 2001 MEMORANDUM FOR THE DIRECTOR, OFFICE OF MANAGEMENT AND ADMINISTRATION FROM: Phillip L. Holbrook (Signed) Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Issues Regarding Fee Structure for

137

[Type text] 2012 Higher Education Units and Fees (version 1) October 2011 Page 1  

E-Print Network (OSTI)

EDUCATION UNITS AND FEES UNIT CODE UNIT TITLE CreditPts EFTSL UnitFeefor 2012/11/10CSP UnitFeeforpre- 2010CSP UnitFeeforpre- 2009CSP UnitFeeforpre- 2008CSP FullTuitionFees fornon-CSP ACH400 RESEARCHFeefor 2012/11/10CSP UnitFeeforpre- 2010CSP UnitFeeforpre- 2009CSP UnitFeeforpre- 2008CSP Full

138

Updated May 7th, 2014 Graduate May 2014 April 2015 Program Specific Tuition Fees  

E-Print Network (OSTI)

.00 $28,160.00 Executive MBA (Global Energy) $106,050.00 $106,050.00 Graduate Programs in Education Ed ­ Educational Psychology Continuing Fees on 4th year onward at anniversary $1,164.00 N/A Master of Counselling-Course Fee (For students not in MPP program) $1,615.98 $2,424.02 MSC in Sustainable Energy Development SEDV

de Leon, Alex R.

139

Updated April 22, 2013 Graduate May 2013 April 2014 Program Specific Tuition Fees  

E-Print Network (OSTI)

,880.72 $27,880.72 Executive MBA (Global Energy) $110,000.00 $110,000.00 Graduate Programs in Education Ed ­ Educational Psychology Continuing Fees on 4th year onward at anniversary $1,152.15 N/A Master of Counselling,217.50 MPP Half-Course Fee (For students not in MPP program) $1,600.00 $2,400.00 MSC in Sustainable Energy

de Leon, Alex R.

140

Performance-based Contracting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performance-based Contracting Performance-based Contracting [Reference: FAR 37.6; DEAR 970.1001] Overview This section provides guidance and instruction for the development and administration of Performance-Based Contracting concepts for the Department's management and operating contracts, and other major operating contracts, as appropriate. Background In 1997, the Department published a final rule (62 FR 34842) which implemented a number of recommendations principally in areas relating to the acquisition processes of its management and operating contracts. One of these recommendations involved the adoption of performance-based contracting concepts. Since the beginning of its contract reform initiatives, the Department has tested a number of approaches to conform its use of fee to such concepts. A core consideration in the application of

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Payment Of the New Mexico Environment Department- Hazardous Waste Bureau Annual Business and Generation Fees Calendar Year 2011  

SciTech Connect

The purpose of this letter is to transmit to the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB), the Los alamos National Laboratory (LANL) Annual Business and Generation Fees for calendar year 2011. These fees are required pursuant to the provisions of New Mexico Hazardous Waste Act, Chapter 74, Article 4, NMSA (as amended). The Laboratory's Fenton Hill Facility did not generate any hazardous waste during the entire year, and is not required to pay a fee for calendar year 2011. The enclosed fee represents the amount for a single facility owned by the Department of Energy and co-operated by the Los Alamos National Security, LLC (LANS).

Juarez, Catherine L. [Los Alamos National Laboratory

2012-08-31T23:59:59.000Z

142

The Laboratory Performance Appraisal Process and Performance Evaluation and Measurement Plan Preparation Guidance  

NLE Websites -- All DOE Office Websites (Extended Search)

0136 0136 Contract No. DE-AC02-09CH11466 Section J - Appendix B J-B-1 ATTACHMENT J.2 APPENDIX B PERFORMANCE EVALUATION AND MEASUREMENT PLAN FISCAL YEAR 2014 Applicable to the Operation of the Princeton Plasma Physics Laboratory A Department of Energy National Laboratory Contract No. DE-AC02-09CH11466 Modification No.0136 Contract No. DE-AC02-09CH11466 Section J - Appendix B J-B-2 TABLE OF CONTENTS Section Page No. INTRODUCTION J-B-5 I. DETERMINING THE CONTRACTOR'S PERFORMANCE RATING AND PERFORMANCE-BASED FEE AND AWARD TERM ELIGIBILITY (as applicable) J-B-5 Performance Evaluation Methodology J-B-6 Calculating Individual Goal Scores and Letter Grade J-B-8 Determining the Amount of Performance-Based Fee Earned J-B-8

143

SES Probationary Period | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SES Probationary Period SES Probationary Period SES Probationary Period An individual's initial appointment as an SES career appointee becomes final only after the individual has served a 1-year probationary period as a career appointee. That employee's rating official must perform an assessment of the new SES's performance during the probationary period. After the one year the selecting official must certify that the appointee performed at the level of excellence expected of a senior executive during the probationary period. When a career appointee's executive qualification have been certified by a Qualifications Review Board on the basis of special or unique qualities, as described in Sec. 317.502(c), the probationary assessment must address any executive development activities the agency identified in support of the

144

Rules and Regulations Pertaining to a User Fee System for Point Source Dischargers that Discharge Pollutants into the Waters of the State (Rhode Island)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations establish a user fee system for point source dischargers that discharge pollutants into the surface waters of the State. The funds from such fees are used by the Department of...

145

The licensing of patents in return for a fee or royalties has a key role in drug discovery.  

E-Print Network (OSTI)

The licensing of patents in return for a fee or royalties has a key role in drug discovery. Now the licensee brings out a new product, it may be unclear whether they need to pay royalty fees to the patentee patents in exchange for royalty payments; however, they disputed whether the licence of two patents

Cai, Long

146

City of Santa Monica - Building Permit Fee Waiver for Solar Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » City of Santa Monica - Building Permit Fee Waiver for Solar Projects City of Santa Monica - Building Permit Fee Waiver for Solar Projects < Back Eligibility Commercial Construction Installer/Contractor Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State California Program Type Green Building Incentive Provider City of Santa Monica In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff from the Solar Santa Monica office, the city released their [http://www.solarsantamonica.com/documents/PVSubmittalRequirement2010.pdf

147

Data:50191a82-61be-44c0-95d9-13a0eb483fee | Open Energy Information  

Open Energy Info (EERE)

a82-61be-44c0-95d9-13a0eb483fee a82-61be-44c0-95d9-13a0eb483fee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cedarburg Light & Water Comm Effective date: 2011/01/01 End date if known: Rate name: Small Power Optional Time-of-Day Rate - between 50kW and 200kW Demand Transformer Ownership Discount Sector: Industrial Description: "On-Peak" period: 8 a.m. to 8 p.m., Monday through Friday, excluding holidays. Customers on this or the optional time-of-day rate who are metered on the primary side receive a discount. A discount is also available for customers who own and maintain their own transformer.

148

Investigation of periodic multilayers  

E-Print Network (OSTI)

Periodic multilayers of various periods were prepared according to an algorithm proposed by the authors. The reflectivity properties of these systems were investigated using neutron reflectometry.The obtained experimental results were compared with the theoretical expectations. In first approximation, the results proved the main features of the theoretical predictions. These promising results initiate further research of such systems.

Bodnarchuck, V; Ignatovich, V; Veres, T; Yaradaykin, S

2009-01-01T23:59:59.000Z

149

PARS II Process Document – DOE Period Close  

Energy.gov (U.S. Department of Energy (DOE))

This document details the process adopted by the Office of Acquisition and Project Management to prepare APM DepSec Monthly Status Report, finalize DOE close period package, and perform reporting...

150

File:Geothermal fee schedule 08-08-10.pdf | Open Energy Information  

Open Energy Info (EERE)

fee schedule 08-08-10.pdf fee schedule 08-08-10.pdf Jump to: navigation, search File File history File usage File:Geothermal fee schedule 08-08-10.pdf Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 33 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 20:19, 16 November 2012 Thumbnail for version as of 20:19, 16 November 2012 1,650 × 1,275 (33 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:Geothermal_fee_schedule_08-08-10.pdf&oldid=537711"

151

Report on Audit of Department of Energy Management and Operating Contractor Available Fees, IG-0390  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF DEPARTMENT OF ENERGY MANAGEMENT AND OPERATING CONTRACTOR AVAILABLE FEES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative address: Department of Energy Headquarters Gopher

152

Page 1 of 2 2014-15 Postgraduate Tuition Fees for Institute of Petroleum  

E-Print Network (OSTI)

Page 1 of 2 2014-15 Postgraduate Tuition Fees for Institute of Petroleum Engineering programmes Programme title Award FT PT FT PT FT PT Petroleum Geoscience MSc / PGDip £9,720 - £11,470 - £25,920 - Petroleum Engineering MSc / PGDip £9,720 - £11,470 - £25,920 - Reservoir Evaluation & Management MSc / PGDip

Painter, Kevin

153

Page 1 of 3 2013-14 Postgraduate Tuition Fees for Institute of Petroleum  

E-Print Network (OSTI)

Page 1 of 3 2013-14 Postgraduate Tuition Fees for Institute of Petroleum Engineering programmes Overseas Home/EU Overseas Programme title Award FT PT FT PT FT PT FT PT FT PT Petroleum Geoscience MSc campus) MSc / PGDip / PGCert £4,600 - £5,430 - £12,000 - £4,520 - £23,400 - Petroleum Engineering MSc

Painter, Kevin

154

Boston University User Fee Structure for ICP-ES, ICP-MS and Laser Labs  

E-Print Network (OSTI)

Boston University User Fee Structure for ICP-ES, ICP-MS and Laser Labs The Department of Earth for digestions protocols include flux fusions, microwave digestions, and open vial digestions. Standardization come to BU and digest their samples in our labs with sufficient training. Laser-ICP-MS cost per sample

Hutyra, Lucy R.

155

Fee Name: Increase University Library Hours of Operation Measure #: Measure 42  

E-Print Network (OSTI)

a quiet, uninterrupted space for study. Greater access to the Library is a key component to the studentsFee Name: Increase University Library Hours of Operation Measure #: Measure 42 Ballot Information Shall the undergraduate and graduate students of UCSC provide funding for the University Library (Mc

California at Santa Cruz, University of

156

Fee-For-Service Contracts in the Pharmaceutical Industry (Extended Abstract)  

E-Print Network (OSTI)

Fee-For-Service Contracts in the Pharmaceutical Industry (Extended Abstract) Kathleen Martino and Yao Zhao Starting from 2005, the pharmaceutical industry has experienced a drastic change in the pricing contracts between manufacturers and distributors as the industry moved from the dominating Buy

Lin, Xiaodong

157

Costs for Academic Year 2013-2014 Tennessee Resident Tuition & Fees  

E-Print Network (OSTI)

Costs for Academic Year 2013-2014 Tennessee Resident Tuition & Fees New Undergraduate $11 Information Graduates of the BS curricula offered by the college may pursue advanced graduate study or take Industrial Engineering Materials Science & Engineering Mechanical Engineering Nuclear Engineering Master

Wang, Xiaorui "Ray"

158

User fees, health staff incentives, and service utilization in Kabarole District, Uganda  

E-Print Network (OSTI)

User fees, health staff incentives, and service utilization in Kabarole District, Uganda Walter in Kabarole District, western Uganda. Methods Of the 38 government health units that had introduced user incentive plans; Cost sharing; Community health centers/utilization; Health; Health care surveys; Uganda

Scharfstein, Daniel

159

Budget Period 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Budget Period 1 Budget Period 1 Budget Period 2 Budget Period 3 0.0% 0.0% 0.0% PMC123.1 - Budget Justification for SF 424A Budget 0 Additional Explanations/Comments (as necessary) *IMPORTANT: In the space provided below (or as an attachment) provide a complete explanation and the full calculations used to derive the total indirect costs. If the total indirect costs are a cumulative amount of more than one calculation or rate application, the explanation and calculations should identify all rates used, along with the base they were applied to (and how the base was derived), and a total for each (along with grand total). The rates and how they are applied should not be averaged to get one indirect cost percentage. NOTE: The indirect rate should be applied to both the Federal Share and Recipient Cost Share.

160

Optimizing Matrix Multiply using PHiPAC: a Portable, HighPerformance, ANSI C Coding Methodology  

E-Print Network (OSTI)

Optimizing Matrix Multiply using PHiPAC: a Portable, High­Performance, ANSI C Coding Methodology Je Portable, High­Performance, ANSI C #PHiPAC, pro­ nounced #fee­pack''#. Second, rather than code by hand, we

Bilmes, Jeff

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Effects of increasing filing fees for noncompetitive onshore oil and gas leases  

SciTech Connect

The Government Accounting Office (GAO) examined the impact of increasing the fee charged to applicants for noncompetitive onshore oil and gas leases from $25.00 to $75.00. Interior believes the increased filing fee will: (1) reduce casual speculation and multiple filings, thereby reducing fraud potential, development delays caused by assignments, and administrative burden; and (2) generate significant additional revenue. Interior's analysis is, of necessity, based largely on conjecture, but the possibility that the positive results foreseen may not materialize to the degree projected cannot be ruled out. For example, while it is likely that the $75 fee will generate additional revenue over what was obtainable under either the $10 or $25 rate, Interior's projections of at least a million filings annually and $150 million in revenues are far from certain. GAO was also unable in the time available to determine the degree to which the problems the Department desires to overcome exist, or that they will be resolved through a fee increase. Results suggest that: reducing the number of filings is not necessarily the total or only solution to reducing the administrative burden; the casual speculator is not having that great an adverse effect on development, and in fact has certain positive aspects; and the true extent of fraud in the SOG may not be as great as initially supposed. In addition, there are possible adverse effects that may not have been fully considered. For example, the increased filing fee, when coupled with the increased rental, could adversely affect industry's exploration activities, particularly that of the smaller independent. GAO suggests, now that the increase is in effect, that the Interior Department and the Congress closely watch the results, and be prepared to take remedial action if deemed necessary.

Not Available

1982-03-19T23:59:59.000Z

162

All degree seeking students enrolled in 4 or more credit hours during the fall and/or spring semester shall pay all mandatory student fees. Degree seeking students enrolled in Field Session or Summer Session shall pay the fees specified  

E-Print Network (OSTI)

and internet network access, dial-in-services, software licensing and service support, and appropriate access in the 2007-2008 year, the fee will be used to provide all CSM students with a RTD College Pass (good for all

163

Periodic pumping tests  

Science Journals Connector (OSTI)

......pumping period. The considered penetration depth (eq. 6) constitutes...well transmitted beyond the penetration depth. It is only a question...measurable. In contrast, flow rate measured at the pumping well...subsurface volume represented by penetration depth.) We cannot exclude......

Jörg Renner; Mareike Messar

2006-10-01T23:59:59.000Z

164

The Impact of Water Use Fees on Dispatching and Water Requirements for Water-Cooled Power Plants in Texas  

Science Journals Connector (OSTI)

The Impact of Water Use Fees on Dispatching and Water Requirements for Water-Cooled Power Plants in Texas ... Fees ranging from 10 to 1000 USD per acre-foot were separately applied to water withdrawals and consumption. ... Water consumption for thermoelectricity in Texas in 2010 totaled ?0.43 million acre feet (maf; 0.53 km3), accounting for ?4% of total state water consumption. ...

Kelly T. Sanders; Michael F. Blackhurst; Carey W. King; Michael E. Webber

2014-05-15T23:59:59.000Z

165

Effective Rate Period  

NLE Websites -- All DOE Office Websites (Extended Search)

Fiscal Year 2014 Fiscal Year 2014 Effective Rate Period As of Beginning of the FY 10/01/2013 - 09/30/2014 Mid-Year Changes (if applicable) 10/01/2013 - 09/30/2014 Power Rates Annual Revenue Requirement Rate Schedule Power Revenue Requirement $73,441,557 CV-F13 Base Resource Revenue Requirement $69,585,875 First Preference Revenue Requirement $3,855,682

166

Ball Packings with Periodic Constraints  

Science Journals Connector (OSTI)

We call a periodic ball packing in $$d$$d-dimensional Euclidean space periodically (resp. strictly) jammed with respect to a period lattice $$\\varLambda $$¿ if there are no nontrivial motions of the balls that preserve $$\\varLambda $$¿ (resp. that maintain ... Keywords: 52C17, Ball packings, Jamming, Periodic packings, Rigidity, Tensegrities

Robert Connelly, Jeffrey D. Shen, Alexander D. Smith

2014-12-01T23:59:59.000Z

167

What is greener than a VMT tax? The case for an indexed energy user fee to finance us surface transportation  

SciTech Connect

Highway finance in the United States is perceived by many to be in a state of crisis, primarily due to the erosion of motor fuel tax revenues due to inflation, fuel economy improvement, increased use of alternative sources of energy and diversion of revenues to other purposes. Monitoring vehicle miles of travel (VMT) and charging highway users per mile has been proposed as a replacement for the motor fuel tax. A VMT user fee, however, does not encourage energy efficiency in vehicle design, purchase and operation, as would a user fee levied on all forms of commercial energy used for transportation and indexed to the average efficiency of vehicles on the road and to inflation. An indexed roadway user toll on energy (IRoUTE) would induce two to four times as much reduction in greenhouse gas (GHG) emissions and petroleum use as a pure VMT user fee. However, it is not a substitute for pricing GHG emissions and would make only a small but useful contribution to reducing petroleum dependence. An indexed energy user fee cannot adequately address the problems of traffic congestion and heavy vehicle cost responsibility. It could, however, be a key component of a comprehensive system of financing surface transportation that would eventually also include time and place specific monitoring of VMT for congestion pricing, externality charges and heavy vehicle user fees.

Greene, David L [ORNL

2011-01-01T23:59:59.000Z

168

Off-grid electrification with solar home systems: The experience of a fee-for-service concession in South Africa  

Science Journals Connector (OSTI)

In rural areas of developing countries, electrification projects with photovoltaic systems were conceived as pilot projects with the implementation of a limited number of systems. After considerable financial support from international donors, photovoltaic systems were often quickly abandoned few years after their installation. Using micro-credit institutions in the energy sector or implementing small utilities with a fee-for-service model is now considered as two desirable options to create a dynamic self-sustained market for solar home systems. South Africa launched in 1999 an ambitious off-grid solar electrification programme with fee-for-service concessions. Operating as small-scale utilities, fee-for-service concessions have facilitated the implementation on a large scale of solar home systems and solved the issue of high up-front cost and of long-term maintenance. This paper focuses on operational and design issues linked to the implementation of fee-for-service concessions. Even in a challenging institutional context, some South African operators seem almost able to reach their break-even point. The case of one concessionaire is detailed and serves as a basis for a discussion on the benefits and difficulties linked to the fee-for-service model and on the potential for replication.

Xavier Lemaire

2011-01-01T23:59:59.000Z

169

Ball Packings with Periodic Constraints  

E-Print Network (OSTI)

We call a periodic ball packing in d-dimensional Euclidean space periodically (strictly) jammed with respect to a period lattice if there are no nontrivial motions of the balls that preserve the period (that maintain some period with smaller or equal volume). In particular, we call a packing consistently periodically (strictly) jammed if it is periodically (strictly) jammed on every one of its periods. After extending a well-known bar framework and stress condition to strict jamming, we prove that a packing with period Lambda is consistently strictly jammed if and only if it is strictly jammed with respect to Lambda and consistently periodically jammed. We next extend a result about rigid unit mode spectra in crystallography to characterize periodic jamming on sublattices. After that, we prove that there are finitely many strictly jammed packings of m unit balls and other similar results. An interesting example shows that the size of the first sublattice on which a packing is first periodically unjammed is not bounded. Finally, we find an example of a consistently periodically jammed packing of low density \\delta = \\frac{4 \\pi}{6 \\sqrt{3} + 11} + \\epsilon ~ 0.59, where \\epsilon is an arbitrarily small positive number. Throughout the paper, the statements for the closely related notions of periodic infinitesimal rigidity and affine infinitesimal rigidity for tensegrity frameworks are also given.

Robert Connelly; Jeffrey D. Shen; Alexander D. Smith

2013-01-04T23:59:59.000Z

170

Computer Graphic Design Fees Scholarship R E G U L A T I O N S F O R 2 0 1 5  

E-Print Network (OSTI)

Computer Graphic Design Fees Scholarship R E G U L A T I O N S F O R 2 0 1 5 BACKGROUND This Scholarship was established in 2009 by the Faculty of Computing and Mathematical Sciences. REGULATIONS 1. The Scholarship will be known as the Computer Graphic Design Fees Scholarship. 2. The Scholarship will have

Waikato, University of

171

Changing Patterns of Rangeland Use: Functional Characteristics of the Economics and Operations of Fee Hunting Enterprises in Central and South Texas  

E-Print Network (OSTI)

......................................................... 23 3 Reasons a Landowner Would Lease Land for Fee Hunting. Percent Response Data .......................................................... 24 4 Factors a Landowner May Consider When Leasing Land for Fee Hunting. Average Response Data....................................... 25 5 Characteristics of Lease Types. .............................................. 27 6 Comparison of Lease Characteristics. .................................... 27 7 Leased ?By? Characteristics...

Sultenfuss, Sherry D.

2010-07-14T23:59:59.000Z

172

Future QAs_maybe with final RFP  

NLE Websites -- All DOE Office Websites (Extended Search)

expect. Is the NNSA anticipating the payment of full performance fee over the entire ten year contract period, regardless of the amount and evolution of shared savings...

173

ANNEX A TO APPENDIX G, Standard Remittance Advice For Payment of Fees  

U.S. Energy Information Administration (EIA) Indexed Site

Department of Energy Department of Energy Energy Information Administration Form NWPA-830G (Revised 03/12) ANNEX A TO APPENDIX G Standard Remittance Advice For Payment of Fees OMB No: 1901-0260 Expires: 3-31-2016 Burden: 5 Hours Section 1. Identification Information: Please first read the instructions on the back. Section 2. Net Electricity Generated Calculation 1.1 Purchaser Information: Item Unit 1 Unit 2 Unit 3 Station Total 1 1.11 Name:____________________________________________ 2.1 Unit ID Code: 1.12 Address:__________________________________________

174

Performance Based Incentive FY13 Contractor: Contract: DE-EM0001971  

NLE Websites -- All DOE Office Websites (Extended Search)

Based Incentive Based Incentive FY13 Contractor: Contract: DE-EM0001971 Award Period: Metric 1: Quarter Cubic Meters x $800/m 3 = Fee Earned 1 st 1806.77 $800 $1,445,416 Approved 8/12/2013 2 nd 912.68 $800 $730,144 Approved 9/1/2013 3 rd $800 $0 4 th $800 $0 Totals 2719.45 $2,175,560 Quarter Cubic Meters x $16,000/m 3 = Fee Earned 1 st 14.89 $16,000 $238,240 Approved 8/12/2013 2 nd 6.97 $16,000 $111,520 Approved 9/1/2013 3 rd $16,000 $0 4 th $16,000 $0 Totals 21.86 $349,760 PBI formula PBI Fee Earned Basis of Evaluation a. For each cubic meter of CH waste dispositioned (removed from the TRU inventory of disposed of at WIPP) under Metric 1, a fee of $800 will be earned up to a maximum total of $4,000,000 (approximately 5,000 cubic meters dispositioned). M&O - Waste Isolation Pilot Plant 10/1/12-9/30/17- five-year option to 9/30/22

175

Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Reserve 905 905 MSA Direct Funded RL-0041 Reserve 92 92 MSA Fee Accrual 1,688 TOTAL 33,794 67,794 18,852 AFP Approved Funding Plan. HAMMER Volpentest HAMMER Training...

176

Physics Tutoring List Names shown are either graduate students or Physics majors charging fees for their tutoring services. These  

E-Print Network (OSTI)

6/5/2014 Physics Tutoring List Names shown are either graduate students or Physics majors charging fees for their tutoring services. These persons are not sponsored by UCLA or the Physics & Astronomy Department. Tutor Name Phone E-mail Subject(s) Bauer, David 419.460.1267 dbauer88@gmail.com Physics

Durian, Douglas

177

Kelly House Apartment Community (236 Students, Co-ed by Apt. / Tier 3 Single or Double Occupancy Fee)  

E-Print Network (OSTI)

Kelly House Apartment Community (236 Students, Co-ed by Apt. / Tier 3 Single or Double Occupancy Fee) Kelly House is a four story an apartment complex for upperclassmen at the corner of St. Philip and Vanderhorst Streets. Constructed in 1995, Kelly house features a central courtyard and central laundry room

Kunkle, Tom

178

The impact of infrastructure-related taxes and fees on airline fares in the US and the European Union  

E-Print Network (OSTI)

The purpose of this thesis is to estimate the impact of infrastructure-related add-on taxes and fees on the direct cost of air travel in the United States and the European Union. Its scope includes domestic travel in the ...

Yamanaka, Shiro, 1975-

2005-01-01T23:59:59.000Z

179

Periodicities in gamma ray bursts  

Science Journals Connector (OSTI)

Gamma ray burst models based on magnetic neutron stars face a problem of account for the scarcity of observed periods. Both this scarcity and the typical period found when any is detected are explained if the neutron stars are accreting in binary systems

Kent S. Wood

1984-01-01T23:59:59.000Z

180

Periodic  

NLE Websites -- All DOE Office Websites (Extended Search)

04 04 by C.G. Wohl (LBNL). Adapted from the Commission of Atomic Weights and Isotopic Abundances, "Atomic Weights of the Elements 1995," Pure and Applied Chemistry 68, 2339 (1996), and G. Audi and A.H. Wapstra, "The 1993 Mass Evaluation," Nucl. Phys. A565, 1 (1993). The atomic number (top left) is the number of protons in the nucleus. The atomic mass (bottom) is weighted by isotopic abundances in the Earth's surface. For a new determination of atomic masses, not weighted by abundances, see G. Audi, A.H. Wapstra, and C. Thibault, Nucl. Phys. A729, 337 (2003). Atomic masses are relative to the mass of the carbon-12 isotope, defined to be exactly 12 unified atomic mass units (u). Errors range from 1 to 9 in the last digit quoted. Relative isotopic abundances often vary considerably, both in natural and commercial samples. A number in parentheses is the mass of the longest-lived

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Microsoft Word - 2008 Fee Adequacy 7-30-08 green.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RW-0593 RW-0593 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report July 2008 U.S. Department of Energy Office of Civilian Radioactive Waste Management Washington, D.C. This publication was produced by the U.S. Department of Energy Office of Civilian Radioactive Waste Management (OCRWM) For further information contact: U.S. Department of Energy Office of Civilian Radioactive Waste Management Waste Management Office, RW-9 1000 Independence Ave., S.W. Washington, DC 20585 or: U.S. Department of Energy Office of Civilian Radioactive Waste Management Office of External Affairs, RW-14 1551 Hillshire Drive Las Vegas, NV 89134 or call: Office of Civilian Radioactive Waste Management 1-800-225-6972 or visit: the OCRWM Home Page:

182

Microsoft Word - FeeAdequacyAssessmentReport-1-16-clean_FINAL_v2-cn-substantiveeditsCAFINALv1.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary of Energy Secretary of Energy Washington, DC 20565 Secretarial Detcl'lninatiou of the Adequacy of the Nuclear Waste Fund Fee Based on the attached U.S. Department of Energy Nuclear Waste Fund Fee Adequacy Report, I detenuine that neither insufficient nor excess revenues nre being collected in order to recover the costs incurred by the Federal Government that are specified in the Nuclear Waste Policy Act of 1982, as amended. Accordingly, I do not propose an adjustment to the Nuclear Waste Flmd Fee at this time. -~ rlt~V JAN 1 6 2013 Steven Chu Date Attachment This Page Intentionally Left Blank i U.S. Department of Energy Nuclear Waste Fund Fee Adequacy Assessment Report January 2013 U.S. Department of Energy Washington, D.C. This publication was produced by the U.S. Department of Energy

183

Picking up the bill - improving health-care utilisation in the Democratic Republic of Congo through user fee subsidisation: a before and after study  

Science Journals Connector (OSTI)

User fees have been shown to constitute a major barrier to the utilisation of health-care, particularly in low-income countries such as the Democratic Republic of Congo (DRC). Importantly, such barriers can le...

Rishma Maini; Rafael Van den Bergh; Johan van Griensven…

2014-11-01T23:59:59.000Z

184

The link between past informal payments and willingness of the Hungarian population to pay formal fees for health care services: results from a contingent valuation study  

Science Journals Connector (OSTI)

We examine the willingness of health care consumers to pay formal fees for health care use and how this willingness to pay is associated with past informal payments. We use data from a survey carried out in H...

Petra Baji; Milena Pavlova; László Gulácsi…

2014-11-01T23:59:59.000Z

185

Contractor Past Performance Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2009) December 2009) 1 Contractor Performance Information Guiding Principles The primary purpose of past performance evaluations is to ensure that accurate data on contractor performance is current and available for use in source selections. A past performance evaluation report provides a record of a contractor's performance, both positive and negative, on a given contract during a specified period of time. The quality of the narrative component supporting the past performance information evaluation is critical. If the evaluator takes the time to prepare an accurate and complete report, the evaluator helps ensure better quality in the products and services DOE buys now and those DOE plans to buy in the future.

186

Data:Ac6ffe74-5764-4b48-8766-a1929fee6126 | Open Energy Information  

Open Energy Info (EERE)

ffe74-5764-4b48-8766-a1929fee6126 ffe74-5764-4b48-8766-a1929fee6126 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wyandotte Municipal Serv Comm Effective date: 2011/10/01 End date if known: Rate name: PRIMARY SERVICE RATE (LESS THAN 1000KW)(Time-Differentiated Meter) Sector: Commercial Description: To any customer desiring service for all power and lighting purposes served through a transformer of 500 kVA or more and when the customer furnishes, owns, installs, and maintains his own transformation facilities acceptable to WMS. Source or reference: http://www.wyan.org/assets/electric/Electric%20Rates%20October%202011.pdf

187

Data:0acb8b74-4485-4e48-bfd0-fee4784244df | Open Energy Information  

Open Energy Info (EERE)

acb8b74-4485-4e48-bfd0-fee4784244df acb8b74-4485-4e48-bfd0-fee4784244df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Grays Harbor Cnty Effective date: 2013/01/01 End date if known: Rate name: RESIDENTIAL Sector: Residential Description: This schedule is available in all territory served by the District, for electric service for single-family residential and associated purposes. Examples include: Permanent homes, mobile homes, recreational vehicles, residential outbuildings, residential swimming pools, water pumping (excluding non-commercial farm irrigation, and multiple residence water pumping greater than five horsepower.) and individually metered apartments or rental units including building hall lights, air conditioning, water heating, space heating and laundry facilities therein.

188

Data:2e38fe09-4eea-422f-920a-505fee2618bb | Open Energy Information  

Open Energy Info (EERE)

9-4eea-422f-920a-505fee2618bb 9-4eea-422f-920a-505fee2618bb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule ID Small Industrial Service - Demand Metered 35 to 499 kW Sector: Industrial Description: Applicability This schedule applies to: 1) commercial and industrial customers for general power use with a demand of 35 kW to 499 kW, and 2) other services where other Rate Schedules (other than Rate Schedules NM and SG) do not apply. This schedule is applicable on an annual basis only. Power Factor Charge, per kVAr $ 1.10

189

Data:89fee917-1129-442e-b28a-9b075660489f | Open Energy Information  

Open Energy Info (EERE)

fee917-1129-442e-b28a-9b075660489f fee917-1129-442e-b28a-9b075660489f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuming County Public Pwr Dist Effective date: 2011/12/14 End date if known: Rate name: Municipal Commercial Electric Space Heating Rate Sector: Commercial Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

190

A case study of the implementation of a parking fee at R. A. Apffel Park in Galveston, Texas  

E-Print Network (OSTI)

and Atmospheric Administration 1978). Through this effort, Cape Hatteras National Seashore was established. In 1955 the National Park Service (NPS ) issued a report entitled, A Re ort on a Seashore Recreation Area Surve ~ This report inventoried the amount...A CASF. STUDY OF THE IMFLEMENTAT ION OF A PARKING FEE AT R. A. APFFEL FARY. IN GALVESTON, TEXAS A Thesis by SHERYL DRUGGAN ALBERS Su'bmitted to the Graduate College of Texas A&M University in partial fulfillment of the reouirement...

Albers, Sheryl Druggan

1982-01-01T23:59:59.000Z

191

Periodic ripples in suspended graphene  

Science Journals Connector (OSTI)

We study the mechanism of wrinkling of suspended graphene, by means of atomistic simulations. We argue that the structural instability under edge compression is the essential physical reason for the formation of periodic ripples in graphene. The ripple wavelength and out-of-plane amplitude are found to obey 1/4-power scaling laws with respect to edge compression. Our results also show that parallel displacement of the clamped boundaries can induce periodic ripples, with oscillation amplitude roughly proportional to the 1/4 power of edge displacement.

Zhao Wang and Michel Devel

2011-03-23T23:59:59.000Z

192

Auditor and underwriter industry specialization/differentiation: evidence from IPO underpricing and long-term performance  

E-Print Network (OSTI)

???????????????? 80 10 Regression of Underwriting Fee on Auditor and Underwriter Industry Specialization/Differentiation, and Control Variables for All IPOs???.. 81 11 Regression of IPO Long-term Performance (Return on Assets) on Auditor... based upon the industry proportion of the square root of assets (proceeds) audited (underwritten). Additionally, an auditor (underwriter) is defined as ?differentiated? if it has the largest market share in any particular two-digit SIC code per IPO...

Wang, Kun

2006-10-30T23:59:59.000Z

193

The orbital period of the eclipsing dwarf nova CG Draconis  

E-Print Network (OSTI)

We have performed time resolved photometry on the dwarf nova CG Dra and have established for the first time that it is an eclipsing system. By measuring the times of the eclipses, we determined the orbital period as 0.18864(4) d, or 4h 31m 38 +/- 3s. This value is consistent with the shorter of two periods proposed from earlier spectroscopic studies. The orbital period places CG Dra above the period gap. The symmetrical eclipses are of short duration (FWHM 18+/-2 min, or 0.066(7) of the orbital period) and shallow (average 0.16+/-0.02 mag), suggesting a grazing eclipse which is consistent with an orbital inclination just above the critical value. Flickering persists through the eclipse which means that the flickering source is not occulted by the secondary star.

Jeremy Shears; David Boyd; Steve Brady; Roger Pickard

2008-02-04T23:59:59.000Z

194

Down hole periodic seismic generator  

DOE Patents (OSTI)

A down hole periodic seismic generator system for transmitting variable frequency, predominantly shear-wave vibration into earth strata surrounding a borehole. The system comprises a unitary housing operably connected to a well head by support and electrical cabling and contains clamping apparatus for selectively clamping the housing to the walls of the borehole. The system further comprises a variable speed pneumatic oscillator and a self-contained pneumatic reservoir for producing a frequency-swept seismic output over a discrete frequency range.

Hardee, Harry C. (Albuquerque, NM); Hills, Richard G. (Las Cruces, NM); Striker, Richard P. (Albuquerque, NM)

1989-01-01T23:59:59.000Z

195

Advanced downhole periodic seismic generator  

DOE Patents (OSTI)

An advanced downhole periodic seismic generator system for transmitting variable frequency, predominantly shear-wave vibration into earth strata surrounding a borehole. The system comprises a unitary housing operably connected to a well head by support and electrical cabling and contains clamping apparatus for selectively clamping the housing to the walls of the borehole. The system further comprises a variable speed pneumatic oscillator and a self-contained pneumatic reservoir for producing a frequency-swept seismic output over a discrete frequency range.

Hardee, Harry C. (Albuquerque, NM); Hills, Richard G. (Las Cruces, NM); Striker, Richard P. (Albuquerque, NM)

1991-07-16T23:59:59.000Z

196

Long-Period Solar Variability  

SciTech Connect

Terrestrial climate records and historical observations of the Sun suggest that the Sun undergoes aperiodic oscillations in radiative output and size over time periods of centuries and millenia. Such behavior can be explained by the solar convective zone acting as a nonlinear oscillator, forced at the sunspot-cycle frequency by variations in heliomagnetic field strength. A forced variant of the Lorenz equations can generate a time series with the same characteristics as the solar and climate records. The timescales and magnitudes of oscillations that could be caused by this mechanism are consistent with what is known about the Sun and terrestrial climate.

GAUTHIER,JOHN H.

2000-07-20T23:59:59.000Z

197

High performance computing and numerical modelling  

E-Print Network (OSTI)

Numerical methods play an ever more important role in astrophysics. This is especially true in theoretical works, but of course, even in purely observational projects, data analysis without massive use of computational methods has become unthinkable. The key utility of computer simulations comes from their ability to solve complex systems of equations that are either intractable with analytic techniques or only amenable to highly approximative treatments. Simulations are best viewed as a powerful complement to analytic reasoning, and as the method of choice to model systems that feature enormous physical complexity such as star formation in evolving galaxies, the topic of this 43rd Saas Fee Advanced Course. The organizers asked me to lecture about high performance computing and numerical modelling in this winter school, and to specifically cover the basics of numerically treating gravity and hydrodynamics in the context of galaxy evolution. This is still a vast field, and I necessarily had to select a subset ...

,

2014-01-01T23:59:59.000Z

198

On a periodicity measure and superoscillations  

E-Print Network (OSTI)

The phenomenon of superoscillation, where band limited signals can oscillate over some time period with a frequency higher than the band limit, is not only very interesting but it also seems to offer many practical applications. The first reason is that the superoscillation frequency can be exploited to perform tasks beyond the limits imposed by the lower bandwidth of the signal. The second reason is that it is generic and applies to any wave form, be it optical, electrical, sonic, or quantum mechanical. For practical applications, it is important to overcome two problems. The first problem is that an overwhelming proportion of the energy goes into the non superoscillating part of the signal. The second problem is the control of the shape of the superoscillating part of the signal. The first problem has been recently addressed by optimization of the super oscillation yield, the ratio of the energy in the superoscillations to the total energy of the signal. The second problem may arise when the superoscillation, is to mimic a high frequency purely perodic signal. This may be required, for example, when a superoscillating force is to drive a harmonic oscillator at a high resonance frequency. In this paper the degree of periodicity of a signal is defined and applied to some yield optimized superoscillating signals.

Nehemia Schwartz; Moshe Schwartz

2014-02-13T23:59:59.000Z

199

Data:A0fee6a1-2aa1-4217-9458-cb95314b2738 | Open Energy Information  

Open Energy Info (EERE)

fee6a1-2aa1-4217-9458-cb95314b2738 fee6a1-2aa1-4217-9458-cb95314b2738 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Minnesota Power Inc Effective date: 2009/10/01 End date if known: Rate name: RIDER FOR FOND DU LAC RESERVATION BUSINESS LICENSE FEE Sector: Description: APPLICATION Applicable to billings for electric service provided within the Fond du Lac Reservation located in the southern portion of St. Louis County and the northern portion of Carlton County, Minnesota. ADJUSTMENT In accordance with the Corporate Code, Business License System and Employment Rights Law contained in the Fond du Lac Reservation Ordinance 5/84, businesses operating within the Reservation shall pay an assessment of 0.5 percent on revenues from sales within the Reservation. Therefore, there shall be added to each customer's monthly electric service bill a Fond du Lac Reservation Business License Fee assessment. The amount of the fee to be assessed shall be the applicable Assessment Rate multiplied by the Customer's bill for electric service. Compliance by Minnesota Power with the Business License System is governed by the terms of an agreement dated September 25, 1985, as amended by letter dated January 6, 1986, made with the Reservation Business Committee. Since the License Fee assessable by Minnesota Power applies retroactively to October 2, 1985, the initial Assessment Rate shall be 1.0 percent until such time as all retroactive amounts have been collected. Thereafter, the Assessment Rate shall be 0.5 percent.

200

New subdwarf B star periods  

E-Print Network (OSTI)

Subdwarf B (sdB) stars are thought to be helium burning stars with low mass hydrogen envelopes. Several evolutionary paths have been proposed to explain the formation of these systems. One of these scenarios is the evolution of the sdB progenitor within a binary system. We have looked systematically at bright sdB stars from the PG survey. By taking spectra at several different epochs we have measured the radial velocity shifts caused by the motion of the sdB star within the binary. Our data have been taken over a long time base line (2 years) which allowed us to find longer period binaries than known before. Here we present results for 29 sdB systems.

L. Morales-Rueda; P. F. L. Maxted; T. R. Marsh; R. C. North

2002-09-26T23:59:59.000Z

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Periodic Constraint-Based Control Using Dynamic Wireless Sensor Scheduling  

E-Print Network (OSTI)

Periodic Constraint-Based Control Using Dynamic Wireless Sensor Scheduling James Weimer, Jos´e Ara´ujo, Aitor Hernandez and Karl Henrik Johansson Abstract-- Constraint-based control over wireless sensor net- works (WSNs) require control strategies that achieve a desired closed-loop system performance while

Johansson, Karl Henrik

202

Performance Monitoring  

NLE Websites -- All DOE Office Websites (Extended Search)

Optimization Performance Monitoring Performance Monitoring A redirector page has been set up without anywhere to redirect to. Last edited: 2014-08-25 14:37:27...

203

Contractor: Contract Number: Contract Type: Total Estimated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Number: Number: Contract Type: Total Estimated Contract Cost: Performance Period Total Fee Earned FY2008 $2,550,203 FY2009 $39,646,446 FY2010 $64,874,187 FY2011 $66,253,207 FY2012 $41,492,503 FY2013 $0 FY2014 FY2015 FY2016 FY2017 FY2018 Cumulative Fee Earned $214,816,546 Fee Available $2,550,203 Minimum Fee $77,931,569 $69,660,249 Savannah River Nuclear Solutions LLC $458,687,779 $0 Maximum Fee Fee Information $88,851,963 EM Contractor Fee Site: Savannah River Site Office, Aiken, SC Contract Name: Management & Operating Contract September 2013 DE-AC09-08SR22470

204

Annual Performance Report FY 2011 Annual Performance Plan FY 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Performance Report FY 2011 Annual Performance Plan FY 2012 2 FY 2011 OIG Performance Results The OIG measures its performance against long-term and annual goals set forth in OIG planning documents. During this reporting period, the OIG successfully achieved its FY 2011 performance goals. The following are the specific results: Goal 1 Promote Presidential Reform Initiatives, Secretarial Mission Priorities, and Congress Objective 1: Conduct reviews seeking positive change in the Department relating to the implementation of Presidential Reform Initiatives, the Secretary's Mission Priorities, and the OIG-identified Management Challenges. Performance Measures: Accomplishments

205

Polariton dispersion of periodic quantum well structures  

Science Journals Connector (OSTI)

We studied the polariton dispersion relations of a periodic quantum-well structure with a period in the vicinity of half the exciton resonance wavelength, i.e., the Bragg structure. We classified polariton mod...

A. V. Mintsev; L. V. Butov; C. Ell; S. Mosor…

2002-11-01T23:59:59.000Z

206

Performative architecture  

E-Print Network (OSTI)

The following thesis explores two central hypotheses. On the one hand it introduces the idea of performative architecture (performance in design), and has done so with the desire to contribute directly to the expansion of ...

Araya, Sergio (Sergio Alejandro)

2011-01-01T23:59:59.000Z

207

Periodic wave solutions of the Boussinesq equation  

Science Journals Connector (OSTI)

The Boussinesq equation usually arises in a physical problem as a long wave equation. The present work extends the search of periodic wave solutions for it. The Hirota bilinear method and Riemann theta function are employed in the process. We also analyse the asymptotic property of periodic waves in detail. Furthermore, it is of interest to note that well-known soliton solutions can be reduced from the periodic wave solutions.

Yi Zhang; Ling-ya Ye; Yi-neng Lv; Hai-qiong Zhao

2007-01-01T23:59:59.000Z

208

Performance Characterization  

Energy.gov (U.S. Department of Energy (DOE))

Performance characterization efforts within the SunShot Systems Integration activities focus on collaborations with U.S. solar companies to:

209

Contractor Past Performance Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 42.15 (DEC 2010) - Attachment A 2 Blocks 7, 9, 11, 12: Contracting Officer, Contract Completion Date, Awarded Value, and Current Contract Dollar Value are up to date. [Note: When auto-registration is available and used, the Contract Completion Date, Awarded Value, and Current Contract Dollar Value will be pre- populated from FPDS-NG.] Contract Completion Date and Awarded Value should include all option periods, even if the options have not yet been exercised. Block 15: Subcontractors performing 25% or more or a critical aspect of the work are identified. This block is not a place to assess subcontractor performance. Due to privity of contract, the Government can only write a performance assessment for a prime Contractor. Block 17: Contract Effort Description is

210

Data:8fd8fee9-3707-4c99-a646-5fe8054d199a | Open Energy Information  

Open Energy Info (EERE)

fd8fee9-3707-4c99-a646-5fe8054d199a fd8fee9-3707-4c99-a646-5fe8054d199a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (400W HPS-Open/Closed) - Existing Pole Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation

211

Data:Fee7418c-3a41-4178-b2de-9de44c35f3f4 | Open Energy Information  

Open Energy Info (EERE)

Fee7418c-3a41-4178-b2de-9de44c35f3f4 Fee7418c-3a41-4178-b2de-9de44c35f3f4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Lyndonville, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Street Lighting (77 W LED HP without Pole) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

212

Data:03346822-fee4-4b2f-b344-72b5185c740a | Open Energy Information  

Open Energy Info (EERE)

22-fee4-4b2f-b344-72b5185c740a 22-fee4-4b2f-b344-72b5185c740a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: San Luis Valley R E C, Inc Effective date: 2013/01/01 End date if known: Rate name: Large Power Greater than 1000 kW Secondary Metered Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

213

Data:D727248f-ee36-4ca8-8fb3-e9d93f575de0 | Open Energy Information  

Open Energy Info (EERE)

7248f-ee36-4ca8-8fb3-e9d93f575de0 7248f-ee36-4ca8-8fb3-e9d93f575de0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mitchell Electric Member Corp Effective date: End date if known: Rate name: SCHEDULE LLS-14 Sector: Description: AVAILABILITY Throughout the Cooperative's service area from existing lines of adequate capacity in accordance with the Service Rules and Regulations and subject to the execution of a written agreement for service between the Cooperative and the consumer. Service under this schedule is not available for temporary, standby, or breakdown service or for parallel operation.

214

Data:95c01297-25d4-4abd-931f-7c0fee51dbbb | Open Energy Information  

Open Energy Info (EERE)

1297-25d4-4abd-931f-7c0fee51dbbb 1297-25d4-4abd-931f-7c0fee51dbbb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: KEM Electric Coop Inc Effective date: End date if known: Rate name: Grain Drying Controlled - Three Phase/Submeter Sector: Commercial Description: Available to all members who are drying agricultural crops. Type of Service This is a sub-meter service. Single phase greater than 50 kVa or three phase, 60 cycles, at secondary voltages. The Cooperative will provide sub-meter, meter socket, and C.T. equipment, and load management device necessary to measure and interrupt electric usage.

215

Data:Fee0631d-1763-440b-9014-ac4cd388a9e2 | Open Energy Information  

Open Energy Info (EERE)

Fee0631d-1763-440b-9014-ac4cd388a9e2 Fee0631d-1763-440b-9014-ac4cd388a9e2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Utility District No 2 Effective date: 2011/10/01 End date if known: Rate name: Small Commercial Single Phase Sector: Commercial Description: This schedule is applicable to SMALL commercial and other services not eligible under other rate schedules where measured demand is less than 50 kW. Commercial accounts are billed on a regular monthly cycle. Power Cost Adjustment Factor = 7% The Power Cost Adjustment is based on rate adjustments from BPA . Minimum Charge Single Phase - $ 21.00 per meter per month

216

Data:F536be86-5808-44bb-a807-381cd4901fee | Open Energy Information  

Open Energy Info (EERE)

be86-5808-44bb-a807-381cd4901fee be86-5808-44bb-a807-381cd4901fee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Chickasaw Electric Coop, Inc Effective date: 2012/06/01 End date if known: 2012/06/30 Rate name: Industrial GSA 3-Rate 54, 55,59 Sector: Industrial Description: *GSA - 3 (1001 - 5000 KW) Source or reference: http://chickasaw.coop/Rates/rates_201206.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

217

Data:A7bca1b5-83c3-47ab-839f-ee41609fbb05 | Open Energy Information  

Open Energy Info (EERE)

bca1b5-83c3-47ab-839f-ee41609fbb05 bca1b5-83c3-47ab-839f-ee41609fbb05 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 1997/02/01 End date if known: Rate name: Unmetered Decorative Outdoor Lighting Service - 9,500 Lumens Sector: Lighting Description: Source or reference: www.rivierautilities.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

218

Data:68ab6a98-327f-4864-9d4c-51fc603fee13 | Open Energy Information  

Open Energy Info (EERE)

a98-327f-4864-9d4c-51fc603fee13 a98-327f-4864-9d4c-51fc603fee13 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Power Admin Effective date: End date if known: Rate name: Wholesale Power Rate Schedule CP&L-2-B Sector: Commercial Description: Source or reference: http://199.44.84.82/files/CP&L-2-B.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

219

Data:F8fee5d3-3ff9-4cb3-8745-ce6b96824719 | Open Energy Information  

Open Energy Info (EERE)

fee5d3-3ff9-4cb3-8745-ce6b96824719 fee5d3-3ff9-4cb3-8745-ce6b96824719 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2004/02/21 End date if known: Rate name: Single Phase Master Metered (Non Demand) RV Parks (400-499 local access) Sector: Residential Description: Service under this schedule is available to master-metered mobile home parks and recreational vehicle (RV) parks. The type of service provided under this schedule is single phase, at the standard voltage available for the premises to be served, supplied through one meter at one point of delivery.

220

Data:90368ef0-e63f-4683-9c8f-ee6e563cef0b | Open Energy Information  

Open Energy Info (EERE)

368ef0-e63f-4683-9c8f-ee6e563cef0b 368ef0-e63f-4683-9c8f-ee6e563cef0b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Black River Falls, Wisconsin (Utility Company) Effective date: 2010/04/15 End date if known: Rate name: Street Lighting - Ms-1 - Contributed Lights 150 W HPS (100% contributed) Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will install and maintain street lighting units. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=550 Source Parent: Comments Applicability

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Effect of Water Quality on the Performance of Boiler in Nigerian Petroleum Industry  

E-Print Network (OSTI)

This work investigates quality of water used in boilers of Refinery Company in Nigeria. The results shows that the quality of water fed to boilers are off specification. Low water quality used in boilers led to frequent failure of the boilers as a result of tube rupture. This has resulted into low capacity utilization and loss of processing fees. The poor performance of the boiler feed treatment plant is attributable to the deplorable condition of water intake plant, raw water treatment, demineralization plant, change in raw water quality and non-functioning of the polisher unit.

J. O. Odigure; A. S. Abdulkareem; E. T. Asuquo

222

Commercial Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Commercial Performance Commercial Performance Objectives: To review the market potential for improvements in commercial building glazings, quantify the energy savings potentials, explore potential design solutions, and develop guidelines and tools for building designers so that systems are specified and used in an optimal manner. A special emphasis is placed on the daylighting performance of glazings in commercial buildings since lighting is the single largest energy end use and daylighting can improve both visual performance and the quality of the indoor space as well as saving energy. Technical Approach: This project has two major complementary elements. The first is the exploration and assessment of glazing performance in commercial buildings leading to development of design strategies that reduce unnecessary energy use. The final step is creating design guides and tools that make this design knowledge accessible to practitioners, typically carried out in partnership with others. Although the emphasis is energy impacts, e.g. annual energy use, the performance issues addressed in the guides and tools include all that impact the final glazing selection process, e.g. appearance, glare. The second element is an exploration of daylighting strategies for commercial buildings since lighting energy use is the major energy end use in most buildings. This work develops and evaluates new daylighting devices and designs, assesses performance in commercial buildings, and demonstrates system performance using test cells, test rooms and case study buildings. All energy-related aspects of the design solutions, as well as other critical performance issues, are addressed in this work. Results of this work are integrated into the guides and tools described above. Much of this work has been co-supported by utilities and has been carried on in conjunction with participants in an International Energy Agency Daylighting Task.

223

Performance Degradation of LSCF Cathodes  

SciTech Connect

This final report summarizes the progress made during the October 1, 2008 - September 30, 2013 period under Cooperative Agreement DE-NT0004109 for the U. S. Department of Energy/National Energy Technology Laboratory (USDOE/NETL) entitled “Performance Degradation of LSCF Cathodes”. The primary objective of this program is to develop a performance degradation mitigation path for high performing, cost-effective solid oxide fuel cells (SOFCs). Strategies to mitigate performance degradation are developed and implemented. In addition, thermal spray manufacturing of SOFCs is explored. Combined, this work establishes a basis for cost-effective SOFC cells.

Alinger, Matthew

2013-09-30T23:59:59.000Z

224

Variable-Period Undulators for Synchrotron Radiation  

SciTech Connect

A new and improved undulator design is provided that enables a variable period length for the production of synchrotron radiation from both medium-energy and high energy storage rings. The variable period length is achieved using a staggered array of pole pieces made up of high permeability material, permanent magnet material, or an electromagnetic structure. The pole pieces are separated by a variable width space. The sum of the variable width space and the pole width would therefore define the period of the undulator. Features and advantages of the invention include broad photon energy tunability, constant power operation and constant brilliance operation.

Shenoy, Gopal; Lewellen, John; Shu, Deming; Vinokurov, Nikolai

2005-02-22T23:59:59.000Z

225

Performance Contracting  

E-Print Network (OSTI)

Performance Contracting ? A Resource for Energy Efficiency Projects Schneider Electric ? Buildings Business ? CATEE 2011 2 Top Challenges for Cities & Schools Tax Revenue Reductions Property values down, sales tax revenue down, etc Energy... issues and needs postponed Schneider Electric ? Buildings Business ? CATEE 2011 3 Performance Contracting can help? Tax Revenue Reductions Redirect funds already being spent on utilities Energy Price & Availability Issues Equip you with the tools...

Goodin, E.

2011-01-01T23:59:59.000Z

226

EIS-0504: Notice of Extension of Scoping Period | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Extension of Scoping Period EIS-0504: Notice of Extension of Scoping Period Gulf LNG Liquefaction Project, Jackson County, Mississippi FERC extended the scoping period to September...

227

Lengthening the Storage Period of Cucumbers.  

E-Print Network (OSTI)

TEXAS AGRICULTURAL EXPERIMENT STATION A. B. CONNER, DIRECTOR COLLEGE STATION, BRAZOS COUNTY, TEXAS BULLETIN NO. 576 AUGUST 1939 DIVISION OF RURAL HOME RESEARCH AND DIVISION OF HORTICULTURE 1NGTHENING THE STORAGE PERIOD OF CUCUMBERS..., in common storage. Consid- ering only loss of weight the period of common storage was increased from 1 to 7 weeks. When other factors such as palatability are taken into account, M. T. Cellophane wrapped cucumbers remained in good condition only about 10...

Hawthorn, L. R. (Leslie Rushton); Whitacre, Jessie (Jessie Opal); Yarnell, S. H. (Sidney Howe)

1939-01-01T23:59:59.000Z

228

High?frequency cutoff periodic dielectric waveguides  

Science Journals Connector (OSTI)

We report high?frequency cutoff in periodic dielectric waveguides. The guides consisted of 1?? photoresist film with a surface corrugation of up to 500 Å overlaid on fused silica substrates. At a wavelength of 1.064 ? we obtained transition between complete cutoff and propagation by variation in the periodicity of the guide of ± 30 Å. For gratings having 500?Å corrugation unobstructed propagation at 1.32 ? occurred with complete stopping of 1.064?? light.

F.W. Dabby; M.A. Saifi; A. Kestenbaum

1973-01-01T23:59:59.000Z

229

Data:1fa28776-b008-449b-8dd7-8491526fee38 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:1fa28776-b008-449b-8dd7-8491526fee38 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2013/11/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 1 - RESIDENTIAL SERVICE NSS (Non-Retail) Sector: Residential Description: APPLICABLE TO THE USE OF SERVICE FOR: Residential Customers in individual private dwellings, flats or apartments, and Religious Customers utilizing service exclusively in connection with religious purposes by a corporation or association organized and conducted in good faith for religious purposes. Applicable also to use exclusively in connection with a community residence for the mentally disabled, as defined in subdivision 28, 28-a, or 28-b of section 1.03 of the mental hygiene law, provided that such residence is operated by a not-for-profit corporation and, if supervisory staff is on site 24 hours a day, that the residence provides living accommodations for 14 or fewer residents. Also applicable to any not-for-profit corporation that is a veterans' organization that owns or leases a post or hall. Flat rate Adjustments = Transition Charge+MFC

230

Attachment 4 Volume III Pricing Matrix for Phase-in Period.xls  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 VOLUME III Logistics Services A-76 Study - Service Provider Price Offer for Phase in Period, Volume III. Service Provider Name: GSA Schedule Contract Number: Expiration Date of GSA Schedule Contract: Duration of Phase in Period: 9 Calendar Months Term of Performance Phase-In Period 10/01/2004 - 06/30/2005 Base Period Year One07/01/2005 - 06/30/2006 Year Two 07/01/2006 - 06/30/2007 Period Three 07/01/2007 - 09/30/2007 Option Period Year One 10/01/2007 - 09/30/2008 Year Two 10/01/2008 - 09/30/2009 1. PRIME SERVICE PROVIDER COMMERCIAL DISCOUNT ATO FEDERAL OR BASE LABOR PERCENTAGE COMMERCIAL PROPOSED TOTAL GSA LABOR RATE RATE/HOUR FROM GSA RATE BURDENED RATE HOURS PROPOSED COST 2. TEAM MEMBER (Subcontractor) COMMERCIAL DISCOUNT ATO FEDERAL OR BASE LABOR PERCENTAGE

231

Optimal Checkpointing Period: Time vs. Energy  

E-Print Network (OSTI)

is focusing on the characteris- tics, features, and challenges of High Performance Computing (HPC) systems-purpose error recovery technique in high performance computing is checkpoint and rollback recovery

Paris-Sud XI, Université de

232

Sound propagation in urban areas: A periodic disposition of buildings  

Science Journals Connector (OSTI)

A numerical simulation of background noise propagation is performed for a network of hexagonal buildings. The obtained results suggest that the prediction of background noise in urban spaces is possible by means of a modified diffusion equation using two parameters: the diffusion coefficient that expresses the spreading out of noise resulting from diffuse scattering and multiple reflections by buildings, and an attenuation term accounting for the wall absorption, atmospheric attenuation, and absorption by the open top. The dependence of the diffusion coefficient with geometrical shapes and the diffusive nature of the buildings are investigated in the case of a periodic disposition of hexagonal buildings.

J. Picaut; J. Hardy; L. Simon

1999-10-01T23:59:59.000Z

233

Property:TimePeriod | Open Energy Information  

Open Energy Info (EERE)

TimePeriod TimePeriod Jump to: navigation, search This is a property of type String. Pages using the property "TimePeriod" Showing 25 pages using this property. (previous 25) (next 25) 0 0.4 kV remote control (Smart Grid Project) + Not available + 2 220 kV SSSC device for power flow control (Smart Grid Project) + Jul 2009 Jul 2014 + A A complete and normalized 61850 substation (Smart Grid Project) + Oct 2009 Dec 2015 + ADELE Project AACAES (Smart Grid Project) + Dec 2009 Dec 2013 + AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration (Smart Grid Project) + 2011-2014 + AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration (Smart Grid Project) (Belgium) + 2011-2014 +

234

Performance Variability  

NLE Websites -- All DOE Office Websites (Extended Search)

Variability Variability of Highly Parallel Architectures William T.C. Kramer 1 and Clint Ryan 2 1 Department of Computing Sciences, University of California at Berkeley and the National Energy Research Scientific Computing Center, Lawrence Berkeley National Laboratory 2 Department of Computing Sciences, University of California at Berkeley Abstract. The design and evaluation of high performance computers has concentrated on increasing computational speed for applications. This performance is often measured on a well configured dedicated sys- tem to show the best case. In the real environment, resources are not always dedicated to a single task, and systems run tasks that may influ- ence each other, so run times vary, sometimes to an unreasonably large extent. This paper explores the amount of variation seen across four large distributed memory systems in a systematic manner. It then

235

The periodic spectroscopic variability of FU Orionis  

Science Journals Connector (OSTI)

......the emergence of the energy liberated by accretion...of the central star in solar masses. The maximum...is the stellar mass in solar masses. Even in the...this could represent an economical solution to the two period...Associations and the Solar Vicinity. Kluwer, Dordrecht......

Stacie L. Powell; Mike Irwin; Jerome Bouvier; Cathie J. Clarke

2012-11-11T23:59:59.000Z

236

Coherency saturation in periodic structures with randomization  

E-Print Network (OSTI)

,28 or multicascade stimulated Raman scattering.29­31 A major example of naturally occurring spatially periodic with very reasonable precision. In the specific case of x ray transition radiation of low layers can generate resonantly enhanced radiation in the hard x ray domain with almost unhampered

Kaplan, Alexander

237

Broadband solar absorption enhancement via periodic  

E-Print Network (OSTI)

Broadband solar absorption enhancement via periodic nanostructuring of electrodes Michael M. Adachi Department of Electrical and Computer Engineering, University of Toronto, Toronto, Ontario M5S 3G4, Canada, 2 Province, 230009, P. R. China. Solution processed colloidal quantum dot (CQD) solar cells have great

238

Property:Maximum Wave Height(m) at Wave Period(s) | Open Energy Information  

Open Energy Info (EERE)

Wave Height(m) at Wave Period(s) Wave Height(m) at Wave Period(s) Jump to: navigation, search Property Name Maximum Wave Height(m) at Wave Period(s) Property Type String Pages using the property "Maximum Wave Height(m) at Wave Period(s)" Showing 25 pages using this property. (previous 25) (next 25) 1 1.5-ft Wave Flume Facility + 10.0 + 10-ft Wave Flume Facility + 10.0 + 11-ft Wave Flume Facility + 10.0 + 2 2-ft Flume Facility + 10.0 + 3 3-ft Wave Flume Facility + 10.0 + 5 5-ft Wave Flume Facility + 10.0 + 6 6-ft Wave Flume Facility + 10.0 + A Alden Large Flume + 0.0 + Alden Wave Basin + 1.0 + C Chase Tow Tank + 3.1 + Coastal Harbors Modeling Facility + 2.3 + Coastal Inlet Model Facility + 2.3 + D Davidson Laboratory Tow Tank + 4.0 + DeFrees Large Wave Basin + 3.0 + DeFrees Small Wave Basin + 3.0 +

239

Embedding a chaotic signature in a periodic train: can periodic signals be chaotic?  

E-Print Network (OSTI)

We show how a chaotic system can be locked to emit a periodic waveform belonging to its chaotic attractor. We numerically demonstrate our idea in a system composed of a semiconductor laser driven to chaos by optical feedback from a short external cavity. The clue is the injection of an appropriate periodic signal that modulates the phase and amplitude of the intra-cavity radiation, a chaotic analogy of conventional mode-locking. The result is a time process that manifests a chaotic signature embedded in a long-scale periodic train.

Antonio Mecozzi; Cristian Antonelli

2008-12-11T23:59:59.000Z

240

Transition Period High Water Marks - May 2009.indd  

NLE Websites -- All DOE Office Websites (Extended Search)

Period High Water Marks (THWMs) and Above-Rate-Period High Water Mark (Above-RHWM) load data for the transition period for all customers with a CHWM contract. The transition...

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Data:4b09a129-5371-4f7c-9fee-f53c3d9e67b4 | Open Energy Information  

Open Energy Info (EERE)

5371-4f7c-9fee-f53c3d9e67b4 5371-4f7c-9fee-f53c3d9e67b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2010/10/26 End date if known: Rate name: Cp-2 Large Power Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0844 per kilowatt-hour.

242

Data:Eb91fee3-46d3-42d9-8075-dbdf640fd8b6 | Open Energy Information  

Open Energy Info (EERE)

fee3-46d3-42d9-8075-dbdf640fd8b6 fee3-46d3-42d9-8075-dbdf640fd8b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NM Effective date: 2011/08/21 End date if known: Rate name: 20 Streetlights and Floodlights 6400 Lumen 70 Watt High Pressure Sodium Streetlight Customer Owned Sector: Lighting Description: Applicable to street lighting and floodlighting systems and under contract with any municipal corporation or other political subdivision within the State of New Mexico. Available within the incorporated limits of cities and towns and adjacent territory served by the Company in its Albuquerque, Valencia, Sandoval, Clayton, Deming, Las Vegas, East Mountain, and Santa Fe Divisions and territory contiguous thereto.

243

Data:Fee5325b-2393-4aed-86b0-ccd004b1eb6f | Open Energy Information  

Open Energy Info (EERE)

Fee5325b-2393-4aed-86b0-ccd004b1eb6f Fee5325b-2393-4aed-86b0-ccd004b1eb6f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barron, Wisconsin (Utility Company) Effective date: 2009/07/15 End date if known: Rate name: Gs-2 General Service-Optional Time-of-Day Single Phase Sector: Commercial Description: Application: This rate schedule is optional to all Gs-1, General Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Fixed Monthly Charge includes Commitment to Community Rider: $3.00 per customer per month

244

Data:Dbe25a1e-0788-49b1-8754-82fee5bf271f | Open Energy Information  

Open Energy Info (EERE)

Dbe25a1e-0788-49b1-8754-82fee5bf271f Dbe25a1e-0788-49b1-8754-82fee5bf271f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: GS Urban-Three Phase Sector: Residential Description: Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH (Added to All Above Energy Rates) Controlled Water Heater Credit $.00736/KWH Applies to the first 1,000 KWHs each month (October-March) Source or reference: http://www.nodakelectric.com/wp-content/uploads/2011/04/General-Service-Rate-Urban1.pdf

245

Data:B52fc314-6fee-4909-a9f8-d21e624a99cc | Open Energy Information  

Open Energy Info (EERE)

fc314-6fee-4909-a9f8-d21e624a99cc fc314-6fee-4909-a9f8-d21e624a99cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2013/07/04 End date if known: 2018/06/30 Rate name: Schedule EV-U - Commercial Public Electric Vehicle Charging Service Pilot Sector: Commercial Description: APPLICABILITY: This Schedule is applicable only for DC fast charging service provided to on-road electric vehicles at Company-operated public electric vehicle charging facilities. A maximum total of twenty-five (25) DC fast charging customer accounts (i.e., 25 utility meters) across the combined service territories of Hawaiian Electric Company, Inc., Maui Electric Company, Limited, and Hawaii Electric Light Company, Inc., will be permitted under this Schedule. The Companies may submit a request to increase the permitted maximum for the review and approval of the Hawaii Public Utilities Commission. Service under this Schedule will be available through June 30, 2018.

246

Data:C5cc335b-19b8-46fe-b828-d09fee0617ec | Open Energy Information  

Open Energy Info (EERE)

35b-19b8-46fe-b828-d09fee0617ec 35b-19b8-46fe-b828-d09fee0617ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: OUTDOOR LIGHTING MV-11* 250 W Sector: Lighting Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. APPLICATION OF SCHEDULE: This schedule is applicable to any Customer for automatically operated dusk to dawn outdoor lighting supplied and operated by the Company.*Due to the U.S. Government Energy Act of 2005, after August 1, 2008, the Company will no longer install Mercury Vapor fixtures for new installations.

247

Data:Fee93627-5be3-4c60-99ef-1677c10c710e | Open Energy Information  

Open Energy Info (EERE)

Fee93627-5be3-4c60-99ef-1677c10c710e Fee93627-5be3-4c60-99ef-1677c10c710e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bay City, Michigan (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: OUTDOOR LIGHTING (Mercury Vapor - 400 watts) Sector: Lighting Description: Rate with Existing Pole(Mercury Vapor - 400 watts) Source or reference: http://www.baycitymi.org/images/Department/electric/pdf/Electric%20Service%20Rate%20Schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

248

Data:F289425d-2fee-45ba-be38-9d3283bc51a9 | Open Energy Information  

Open Energy Info (EERE)

F289425d-2fee-45ba-be38-9d3283bc51a9 F289425d-2fee-45ba-be38-9d3283bc51a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate GS-FL: OPTIONAL UNMETERED GENERAL SERVICE RATE FOR SMALL FIXED LOADS - under 540 hours Sector: Commercial Description: Applicable to electric service in the Company's entire territory where secondary distribution lines exist for any fixed electric load that can be served by a standard service drop from the Company's existing secondary distribution system. For customers taking service under any or all of the provisions of this tariff schedule, this same schedule shall constitute the Company's Standard Service Offer.

249

Data:026252f1-6b41-4fee-9f3f-7cce15266aee | Open Energy Information  

Open Energy Info (EERE)

2f1-6b41-4fee-9f3f-7cce15266aee 2f1-6b41-4fee-9f3f-7cce15266aee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

250

Data:51dec43f-216e-4fee-b2ac-6f68d5ad42db | Open Energy Information  

Open Energy Info (EERE)

dec43f-216e-4fee-b2ac-6f68d5ad42db dec43f-216e-4fee-b2ac-6f68d5ad42db No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Illuminating Co Effective date: 2008/11/01 End date if known: Rate name: NE Sector: Description: Availability: This rider is available to any Distributed Generating Facility on the Customer's Premises with installed nameplate capacity of 500 kilowatts or less if fueled by a Non Class I renewable energy resource, or 50 kilowatts or less if a Fossil Fuel is used. Metering: Customers electing service under this rider in conjunction with a demand-metered supplemental service rate shall be metered by two meters, one meter to measure supplemental service sold to the Customer and one meter to measure kilowatt hours purchased by the Company. Customers electing service under this rider and a non-demand metered supplemental service rate may be metered by one meter. The appropriate meter provision(s) will be provided by the Customer. The Company may install, at its own cost, time-differentiated meters for load research purposes.

251

Data:3ea0fee4-3855-46d5-8ef4-0e966af0073f | Open Energy Information  

Open Energy Info (EERE)

fee4-3855-46d5-8ef4-0e966af0073f fee4-3855-46d5-8ef4-0e966af0073f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 5,000kW Demand 8am-8pm Primary Metering and Transformer Ownership Discount (2,300-15,000 volts)with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

252

Data:B6577e2e-fee7-4b31-a4d9-1559df47d447 | Open Energy Information  

Open Energy Info (EERE)

e-fee7-4b31-a4d9-1559df47d447 e-fee7-4b31-a4d9-1559df47d447 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hartford Electric Effective date: 2005/07/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0452 per kilowatt-hour.

253

Forward period analysis and the long term simulation of a periodic Hamiltonian system  

E-Print Network (OSTI)

The period of a Morse oscillator and mathematical pendulum system are obtained, accurate to 100 significant digits, by forward period analysis (FPA). From these results, the long-term [0, 10^60] (time unit) solutions, which overlap from the Planck time to the age of the universe, are computed reliably and quickly with a parallel multiple-precision Taylor series (PMT) scheme. The application of FPA to periodic systems can reduce the computation loops of long-term reliable simulation from O(t^(1+1/M)) to O(lnt+t/h0) where T is the period, M the order and h0 a constant step-size. This scheme provides a way to generate reference solutions to test other schemes' long-term simulations.

Pengfei Wang

2014-10-23T23:59:59.000Z

254

EIS-0403: Notice to Extend Public Comment Period | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Extend Public Comment Period EIS-0403: Notice to Extend Public Comment Period Solar Energy Development in Six Southwestern States The Department of Energy and the Bureau of...

255

EA-1566: Notice of Comment Period Extension | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1566: Notice of Comment Period Extension Proposed Infrastructure Improvements for the Yucca Mountain Project, Nevada DOE is extending the public comment period for the Yucca...

256

Emissions from Idling Trucks for Extended Time Periods | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Idling Trucks for Extended Time Periods Emissions from Idling Trucks for Extended Time Periods 2002 DEER Conference Presentation: Oak Ridge National Laboratory 2002deerlewis.pdf...

257

EA-1919: Notice of Public Comment Period Extension | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Public Comment Period Extension EA-1919: Notice of Public Comment Period Extension Recycling of Scrap Metals Originating from Radiological Areas DOE has extended the public...

258

Audit Report: OAS-M-06-07 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Audit Report: OAS-M-06-07 August 24, 2006 Management Controls over Performance Fees in the Idaho National Laboratory Contract The Department of Energy (Department) did not always effectively use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures and fees for Fiscal Year (FY) 2005, which were disproportionately high for the work performed. Four of the 49 measures and fees established for FY 2006 provided the contractor the opportunity to earn $1 million under similar circumstances. Also, some of the performance measures worth $460,000, were implemented well after the performance period began. Audit Report: OAS-M-06-07 More Documents & Publications

259

Audit Report: OAS-M-06-07 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OAS-M-06-07 OAS-M-06-07 Audit Report: OAS-M-06-07 August 24, 2006 Management Controls over Performance Fees in the Idaho National Laboratory Contract The Department of Energy (Department) did not always effectively use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures and fees for Fiscal Year (FY) 2005, which were disproportionately high for the work performed. Four of the 49 measures and fees established for FY 2006 provided the contractor the opportunity to earn $1 million under similar circumstances. Also, some of the performance measures worth $460,000, were implemented well after the performance period began. Audit Report: OAS-M-06-07

260

Down-hole periodic seismic generator  

DOE Patents (OSTI)

A down hole periodic seismic generator system is disclosed for transmitting variable frequency, predominantly shear-wave vibration into earth strata surrounding a borehole. The system comprises a unitary housing operably connected to a well head by support and electrical cabling and contains clamping apparatus for selectively clamping the housing to the walls of the borehole. The system further comprises a variable speed pneumatic oscillator and a self-contained pneumatic reservoir for producing a frequency-swept seismic output over a discrete frequency range.

Hardee, H.C.; Hills, R.G.; Striker, R.P.

1982-10-28T23:59:59.000Z

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Prime power subgroups in certain periodic groups  

E-Print Network (OSTI)

P$38E POlfRR SU89%(UPS IM CENPTAI? PERIODIC QROU1'8 A Thee1 ~ ~Ra Paalllae kxeendaria Lpptoved aa to style and oontent by& 6. P. Chairaen of Coaalttee C. c. aden visor a of epee teen t The author wishes to express his gratitude... groups will serve as a starting point. LENMA 1. 1. Let 0 be a group not the 1dentity alone. Then 0 has no proper subgroups 1f and only if 0 is s finite oyolio group of prime order. Suppose that 0 is a finite oyolio group of prime order p...

Armendariz, Efraim Pacillas

2012-06-07T23:59:59.000Z

262

Performance of the nested grid model during cold air outbreaks and periods of return flow  

E-Print Network (OSTI)

into the southern United States across the Gulf Coast, and move into the Gulf of Mexico. As the relatively cool and dry air moves over the warm and moist environment of the Gulf of Mexico, it is modified significantly (Henry and Thompson, 1976; Molinari, 1987... over a polar stereographic map projection used to archive the NGM grid point data. Highlighted points represent sites in the central Gulf, along the Texas/Louisiana coast, over north Texas, and in the lee of the Rockies...

Janish, Paul Richard

2012-06-07T23:59:59.000Z

263

Modeling twin-screw multiphase pump performance during periods of high gas volume fraction  

E-Print Network (OSTI)

pumping adds energy to an unprocessed effluent stream acting as a combined pump and compressor, permitting the recovery of oil and gas on an economical basis. In practice, multiphase production is characterized by wide fluctuations in the gas and liquid...

Singh, Aditya

2003-01-01T23:59:59.000Z

264

Alloy development for irradiation performance. Quarterly progress report for period ending March 31, 1981  

SciTech Connect

This report is organized along topical lines in parallel to a Program Plan of the same title so that activities and accomplishments may be followed readily relative to that Program Plan. Thus, the work of a given laboratory may appear throughout the report. Chapters 1, 2, 8, and 9 review activities on analysis and evaluation, test methods development, status of irradiation experiments, and corrosion testing and hydrogen permeation studies, respectively. These activities relate to each of the alloy development paths. Chapters 3, 4, 5, 6, and 7 present the ongoing work on each alloy development path. The Table of Contents is annotated for the convenience of the reader.

Not Available

1981-07-01T23:59:59.000Z

265

Alloy development for irradiation performance. Quarterly progress report for period ending June 30, 1980  

SciTech Connect

This report is organized along topical lines in parallel to a Program Plan of the same title so that activities and accomplishments may be followed readily relative to that Program Plan. Thus, the work of a given laboratory may appear throughout the report. Chapters 1, 2, 8, and 9 review activities on analysis and evaluation, test methods development, status of irradiation experiments, and corrosion testing and hydrogen permeation studies, respectively. These activities relate to each of the alloy development paths. Chapters 3, 4, 5, 6, and 7 present the ongoing work on each alloy development path. The Table of Contents is annotated for the convenience of the reader.

Ashdown, B.G. (ed.)

1980-10-01T23:59:59.000Z

266

The Joint Owners' Group Program on MOV Periodic Verification  

SciTech Connect

To address long-term motor operated valve (MOV) performance, the Babcock and Wilcox, Boiling Water Reactor, Combustion Engineering and Westinghouse Groups (B and WOG, BWROG, CEOG and WOG) teamed in 1997 to form the Joint Group (JOG) MOV Periodic Verification (PV) Program. This program is nearing completion, with 98 of the 103 operating U.S. reactor units participating. The goal of the program is to provide a justified approach for periodically testing MOVs, that addresses potential degradation. The program defines an interim approach that specifies periodic tests without flow and differential pressure (DP), at a frequency determined by the s risk significance and margin. To justify this approach, each participating plant is also DP testing 2 valves per unit. Each valve is tested three times over five years, with at least one year between tests. The data are evaluated jointly to confirm or adjust the initial guidance. The majority of the tests are complete and conclusions are coming into focus. For gate valves, when the valve factor is initially low, increases can occur between one test and a later test. One common way that the valve factor becomes low is disassembling and reassembling the valve. The data show that, following valve disassembly and re-assembly, the valve factor tends to be reduced, and it tends to increase in subsequent service. Outside of the valves disassembled and reassembled, some gate valves have low valve factors apparently because the valves are not stroked under DP conditions in service. For butterfly valves, there have been no observations of degradation in bearing friction coefficient. A few valves with bronze bearings in raw (untreated) water service have shown significant variations in friction, but they tend to be a mixture of increases and decreases with no pattern of degradation. Globe valves, both unbalanced and balanced, tend to show a constant valve factor with no indication of degradation. (authors)

Damerell, Paul S.; Spears, Todd A. [MPR Associates Inc., 140 Mustang Circle, Simpsonville, SC 29681 (United States)

2002-07-01T23:59:59.000Z

267

Orbital-period variations of the close binaries with late-type components TY Del and RY Cnc  

Science Journals Connector (OSTI)

A detailed study of orbital-period variations was performed for TY Del and RY Cnc, which are both Algol-type eclipsing binaries ... with late-type second aries; for RY Cnc, this is the first study of this...? ...

A. I. Khaliullina

2014-08-01T23:59:59.000Z

268

Electromagnetic Siegert states for periodic dielectric structures  

E-Print Network (OSTI)

The formalism of Siegert states to describe the resonant scattering in quantum theory is extended to the resonant scattering of electromagnetic waves on periodic dielectric arrays. The excitation of electromagnetic Siegert states by an incident wave packet and their decay is studied. The formalism is applied to develop a theory of coupled electromagnetic resonances arising in the electromagnetic scattering problem for two such arrays separated by a distance 2h (or, generally, when the physical properties of the scattering array depend on a real coupling parameter h). Analytic properties of Siegert states as functions of the coupling parameter h are established by the Regular Perturbation Theorem which is an extension the Kato-Rellich theorem to the present case. By means of this theorem, it is proved that if the scattering structure admits a bound state in the radiation continuum at a certain value of the coupling parameter h, then there always exist regions within the structure in which the near field can be amplified as much as desired by adjusting the value of h. This establishes a rather general mechanism to control and amplify optical nonlinear effects in periodically structured planar structures possessing a nonlinear dielectric susceptibility.

Friends R. Ndangali; Sergei V. Shabanov

2011-08-09T23:59:59.000Z

269

Mo Year Report Period: EIA ID NUMBER:  

U.S. Energy Information Administration (EIA) Indexed Site

Version No: 2013.01 Mo Year Report Period: EIA ID NUMBER: http://www.eia.gov/survey/form/eia_14/instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https://signon.eia.doe.gov/upload/noticeoog.jsp Electronic Transmission: The PC Electronic Zip Code - Data Reporting Option (PEDRO) is available. If interested in software, call (202) 586-9659. Email form to: OOG.SURVEYS@eia.doe.gov - - - - Fax form to: (202) 586-9772 Mail form to: Oil & Gas Survey Email address: U.S. Department of Energy Ben Franklin Station PO Box 279 Washington, DC 20044-0279 Questions? Call toll free: 1-800-638-8812 PADD 4 Type of Report (Check One ): (Thousands of dollars) (Thousands of barrels) PADD 2 PADD 3 PAD DISTRICT (a) Revision to Report:

270

Steady periodic gravity waves with surface tension  

E-Print Network (OSTI)

In this paper we consider two-dimensional, stratified, steady water waves propagating over an impermeable flat bed and with a free surface. The motion is assumed to be driven by capillarity (that is, surface tension) on the surface and a gravitational force acting on the body of the fluid. We prove the existence of global continua of classical solutions that are periodic and traveling. This is accomplished by first constructing a 1-parameter family of laminar flow solutions, $\\mathcal{T}$, then applying bifurcation theory methods to obtain local curves of small amplitude solutions branching from $\\mathcal{T}$ at an eigenvalue of the linearized problem. Each solution curve is then continued globally by means of a degree theoretic theorem in the spirit of Rabinowitz. Finally, we complement the degree theoretic picture by proving an alternate global bifurcation theorem via the analytic continuation method of Dancer.

Samuel Walsh

2009-11-06T23:59:59.000Z

271

Geothermal R and D Project report for period April 1, 1976 to June 30, 1976  

Open Energy Info (EERE)

report for period April 1, 1976 to June 30, 1976 report for period April 1, 1976 to June 30, 1976 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Report: Geothermal R and D Project report for period April 1, 1976 to June 30, 1976 Details Activities (1) Areas (1) Regions (0) Abstract: Progress during April to July 1976 in research on geothermal energy is reported. The experiments are performed in the Raft River Valley, Idaho, a hydrothermal resource site with water temperatures below 150/sup 0/C. During this period, a third well, RRGE-3 was drilled and well production was tested, testing of a direct contact heat exchanger continued, design and cost estimating continued on a 40 MW (th) organic-binary heat exchange facility, agricultural studies of irrigation with geothermal water progressed, and down-hole data was obtained from

272

Measuring well hydraulic connectivity in fractured bedrock using periodic slug tests  

Science Journals Connector (OSTI)

Summary Periodic hydraulic experiments were conducted in a five-spot well cluster completed in a single bedding plane fracture. Tests were performed by using a winch-operated slug (submerged solid cylinder) to create a periodic head disturbance in one well and observing the phase shift and attenuation of the head response in the remaining wells. Transmissivity (T) and storativity (S) were inverted independently from head response. Inverted T decreased and S increased with oscillation period. Estimated S was more variable among well pairs than T, suggesting S may be a better estimator of hydraulic connectivity among closely spaced wells. These estimates highlighted a zone of poor hydraulic connection that was not identified by a constant rate test conducted in the same wells. Periodic slug tests appear to be a practical and effective technique for establishing local scale spatial variability in hydraulic parameters.

Eric Guiltinan; Matthew W. Becker

2015-01-01T23:59:59.000Z

273

Carver Performance and Optimization  

NLE Websites -- All DOE Office Websites (Extended Search)

Optimization Performance and Optimization Performance Monitoring Last edited: 2012-01-09 12:31:03...

274

Release and Phase Partitioning of Metals from Anoxic Estuarine Sediments during Periods of Simulated Resuspension  

Science Journals Connector (OSTI)

Periodically, marine sediments are subjected to physical processes which resuspend them into the water column, releasing previously sequestered metals. ... Resuspension energies vary greatly over time, with particle dynamics affected by the changing force and frequency of collisions sustained by particles, along with the quantity of sediment resuspended (13). ... A particle entrainment simulator (PES) was used to perform sediment resuspensions (16). ...

Mark G. Cantwell; Robert M. Burgess; Dana R. Kester

2002-11-06T23:59:59.000Z

275

Energy Savings Performance Contracts Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENERGY SAVINGS PERFORMANCE CONTRACTS SUMMARY ENERGY SAVINGS PERFORMANCE CONTRACTS SUMMARY Site Contract Number Delivery or Task Order # Contractor Performance Period Contract Value Contract Description Richland DE-AC06-97RL13184 N/A Johnson Controls, Inc. 11/15/1996- 11/14/2021 $160.7M Conversion from central coal-fired steam plant to decentralized diesel boilers for Hanford Areas 200 & 300 (Site specific, standalone contract) DE-AM36-97EE73568 DE-AT06-09RL14923 Johnson Controls, Inc. 10/10/2008- 3/31/2033 $19.9M HVAC, Automation, Boiler Improvements Savannah River DE-AM36-02-NT41457 DE-AT09-09SR22572 Ameresco Federal Solutions 5/15/2009- 4/15/2031 $795M Biomass Cogeneration Facility and K and L Area Heating Plants

276

Data:Fee392a9-6caf-4df1-94f3-c4ab26871a3e | Open Energy Information  

Open Energy Info (EERE)

Fee392a9-6caf-4df1-94f3-c4ab26871a3e Fee392a9-6caf-4df1-94f3-c4ab26871a3e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Business Schedule - MMRA-16 (Primary voltage) Sector: Residential Description: Applicable to electric service for the total electrical requirements of master-metered residential apartment complexes where the complex owns, operates, and maintains its own distribution system and distributes electric service to individual family apartments for domestic purposes, and other uses such as central air conditioning and heating, laundry, lighting, and water heating, where all such services are provided only for the apartment complex. Such other uses may be separated from service used within the individual apartment and served on a general service rate schedule. Service hereunder is for the exclusive use of the apartment complex, for itself and its residential tenants and is not to be used for standby, resold, except as may be furnished to its tenants, if no specific charge is made therefor, and is not available to other parties within or without the apartment complex for commercial establishments. Service hereunder shall be supplied at one point of delivery and measured through one meter. Service hereunder is subject to any of Company's rider schedules that may be applicable.

277

Effects of periodic matter in kaon regeneration  

E-Print Network (OSTI)

We study the effects of periodic matter in kaon regeneration, motivated by the possibility of parametric resonance in neutrino oscillations. The large imaginary parts of the forward kaon-nucleon scattering amplitudes and the decay width difference $\\Delta\\Gamma$ prevent a sizable enhancement of the $K_L\\to K_S$ transition probability. However, some interesting effects can be produced using regenerators made of alternating layers of two different materials. Despite the fact that the regenerator has a fixed length one can obtain different values for the probability distribution of the $K_L$ decay into a final state. Using a two-arm regenerator set up it is possible to measure the imaginary parts of the $K^0(\\bar{K}^0)$-nucleon scattering amplitudes in the correlated decays of the $\\phi$-resonance. Combining the data of the single-arm regenerator experiments with direct and reverse orders of the matter layers in the regenerator one can independently measure the CP violating parameter $\\delta$.

Evgeny Akhmedov; Augusto Barroso; Petteri Keränen

2001-07-23T23:59:59.000Z

278

Superconvergence of period doubling cascade in trapezoid maps  

E-Print Network (OSTI)

In the symmetric and the asymmetric trapezoid maps, as a slope of the trapezoid is increased, the period doubling cascade occurs and the symbolic sequence of periodic points is the Metropolis-Stein-Stein sequence and the convergence of the onset point of the period 2^m solution to the accumulation point is exponentially fast. We reported these results previously. In this paper, we give the detailed description of the proof on the results. Further, we study the period doubling cascade starting from period p solution and show the superconvergence of the period doubling cascade.

T. Uezu

2000-01-12T23:59:59.000Z

279

PERIOD ERROR ESTIMATION FOR THE KEPLER ECLIPSING BINARY CATALOG  

SciTech Connect

The Kepler Eclipsing Binary Catalog (KEBC) describes 2165 eclipsing binaries identified in the 115 deg{sup 2} Kepler Field based on observations from Kepler quarters Q0, Q1, and Q2. The periods in the KEBC are given in units of days out to six decimal places but no period errors are provided. We present the PEC (Period Error Calculator) algorithm, which can be used to estimate the period errors of strictly periodic variables observed by the Kepler Mission. The PEC algorithm is based on propagation of error theory and assumes that observation of every light curve peak/minimum in a long time-series observation can be unambiguously identified. The PEC algorithm can be efficiently programmed using just a few lines of C computer language code. The PEC algorithm was used to develop a simple model that provides period error estimates for eclipsing binaries in the KEBC with periods less than 62.5 days: log {sigma}{sub P} Almost-Equal-To - 5.8908 + 1.4425(1 + log P), where P is the period of an eclipsing binary in the KEBC in units of days. KEBC systems with periods {>=}62.5 days have KEBC period errors of {approx}0.0144 days. Periods and period errors of seven eclipsing binary systems in the KEBC were measured using the NASA Exoplanet Archive Periodogram Service and compared to period errors estimated using the PEC algorithm.

Mighell, Kenneth J. [National Optical Astronomy Observatory, 950 North Cherry Avenue, Tucson, AZ 85719 (United States); Plavchan, Peter [NASA Exoplanet Science Institute, California Institute of Technology, Pasadena, CA 91125 (United States)

2013-06-15T23:59:59.000Z

280

Math Library Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Math Library Performance Math Library Performance Fully optimizing a given application's performance often requires a deep understand of the source, an accurate profile for a...

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EIS-0403: Public Comment Period Extension | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

403: Public Comment Period Extension 403: Public Comment Period Extension EIS-0403: Public Comment Period Extension Solar Energy Development in Six Southwestern States The Bureau of Land Management (BLM) announced a two-week extension of the public comment period for the Draft Solar Programmatic Environmental Impact Statement (Draft Solar PEIS), a joint effort with the Department of Energy. The agencies had previously provided for a 120-day public comment period on the Draft Solar PEIS. Because of numerous requests, the agencies extended the comment period by an additional two weeks beyond April 16, 2011. The comment period ran (with extension) until May 2, 2011. EIS-0403-DEIS_Second_Comment_Extension-2011.pdf More Documents & Publications EIS-0403: Notice to Extend Public Comment Period

282

An Investigation into Solar Wind Plasma Periodicities Karolen I. Paularena  

E-Print Network (OSTI)

An Investigation into Solar Wind Plasma Periodicities Karolen I. Paularena Center for Space Research, Massachusetts Institute of Technology, Cambridge, Massachusetts Received ; accepted To be submitted to Journal of Geophysical Research, 1996. Short title: SOLAR WIND PLASMA PERIODICITIES #12

Richardson, John

283

Recommendation 186: Option Periods in Prime Contract Language  

Energy.gov (U.S. Department of Energy (DOE))

The inclusion of option periods in the language of all future DOE Request for Proposals for prime contracts when appropriate.

284

Modeling well performance in compartmentalized gas reservoirs  

E-Print Network (OSTI)

index in estimating reservoir performance. • The optimization routine is done with VBA using Excel solver. Model Assumptions • The reservoir is in stabilized flow under pseudo-steady state conditions at constant pressure with no aquifer influx... is matched with a type curve to predict field performance. Fetkovich Decline Type Curves 11 is based on analytical solutions to flow equations for production at constant BHP and include both transient and boundary dominated flow periods. These log...

Yusuf, Nurudeen

2008-10-10T23:59:59.000Z

285

Modeling well performance in compartmentalized gas reservoirs  

E-Print Network (OSTI)

index in estimating reservoir performance. ? The optimization routine is done with VBA using Excel solver. Model Assumptions ? The reservoir is in stabilized flow under pseudo-steady state conditions at constant pressure with no aquifer influx... is matched with a type curve to predict field performance. Fetkovich Decline Type Curves 11 is based on analytical solutions to flow equations for production at constant BHP and include both transient and boundary dominated flow periods. These log...

Yusuf, Nurudeen

2009-05-15T23:59:59.000Z

286

ESPC Past Performance Questionnaire  

Energy.gov (U.S. Department of Energy (DOE))

Document offers a series of questions to evaluate a contractor’s performance during an energy savings performance contract (ESPC).

287

Data:F71e16fe-e1c6-4d99-bfd2-a79d060bb1b7 | Open Energy Information  

Open Energy Info (EERE)

fe-e1c6-4d99-bfd2-a79d060bb1b7 fe-e1c6-4d99-bfd2-a79d060bb1b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (400 MV Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

288

Getting More Performance from Performance Measurement  

Science Journals Connector (OSTI)

...accountability and a workforce skilled in quality-improvement science. In the table, we offer some recommendations for avoiding the repetition of past failures and increasing the likelihood of success for performance initiatives. The science and practice of performance measurement have advanced substantially... Under today's performance-measurement paradigm, too many resources are invested in assessing too many activities that may not have major effects on patients' health. What can past successes and failures teach us about performance measures that effectively improve care?

Cassel C.K.; Conway P.H.; Delbanco S.F.

2014-12-04T23:59:59.000Z

289

Performance Management Methodology Moving from Performance Measurement to Performance Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guide to a Balanced Scorecard: Guide to a Balanced Scorecard: Performance Management Methodology Moving from Performance Measurement to Performance Management Guide to a Balanced Scorecard Performance Management Methodology Richard H. Hopf Deputy Assistant Secretary for Procurement and Assistance Management Department of Energy Lloyd W. Pratsch Procurement Executive Department of State Robert A. Welch Director for Acquisition Management and Procurement Executive Department of Commerce Pauk A. Denett Director of Administration/Senior Procurement Executive Department of Interior David J. Litman Director, Office of Acquisition and Grants Management Department of Transportation Ida M. Ustad Deputy Associate Administrator for Acquisition Policy General Services Administration Terrence J. Tychan Deputy Assistant Secretary for Grants

290

DOE/NNSA Strategic Performance Evaluation Plan (PEP) FOR MANAGEMENT...  

National Nuclear Security Administration (NNSA)

Services Pantex, LLC Contract Number: DE-AC54-00AL66620 Performance period: October 01, 2013 through September 30, 2014 J D. Woolery P e dent and General Manager B cock & Wilcox...

291

Mode propagation and absorption loss in metal-clad periodic optical waveguides  

SciTech Connect

In terms of the mode eigenvalue equations are field distributions, calculations are performed for Au/InGaAsP/InP, air/Au/InGaAsP/InP, and Au/DiO{sub 2}InGaAsP/InP periodic optical waveguides. On the basis of the computed results, the coupling property in the periodic structure is analyzed, the mode split and the mode band formation of both TE and TM guided modes are described, and the effects of the thickness of the metal cladding and the oxide buffer layer on mode propagation and absorption loss are discussed for TE and TM guided modes as well as for the TM surface-plasma mode. Furthermore, the conversion from the surface-plasma wave to the guided wave for the TM mode is explained for Au/SiO{sub 2}/InGaAsP/InP periodic structures. 27 refs., 8 figs.

Chunsheng Ma [Jilin Univ., Changchun (China)

1996-02-01T23:59:59.000Z

292

1Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

"The Facility Representative Program Performance Indicators (PIs) Quarterly Report is attached, covering the period from January 2000 to March 2000. Data for these indicators are gathered by the...

293

4Q CY2000 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

"The Facility Representative Program Performance Indicators Quarterly Report is attached, covering the period from October to December 2000. Data for these indicators are gathered by the Field...

294

2Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2005. Data for these indicators are gathered by Field elements...

295

4Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

Attached is the Facility Representative Program Performance Indicators (Pis) Quarterly Report Covering the Period from October to December 2002. Data for these indicators are gathered by Field...

296

3Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the Period July  through September 2011. Data for these indicators were gathered...

297

1Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from January to March  2003. Data for these indicators are gathered by Field...

298

4Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

"This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October through December 2011. Data for these indicators were...

299

3Q C&2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

"Attached is the Facility Representative (FR) Program Performance Indicators Quarterly  Report covering the period from July to September   2008. Data for these indicators aregathered by Field...

300

1Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January through March 2012. Data for these indicators were...

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

3Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from July  to September  2002. Data for these indicators are gathered by the Field...

302

2Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from April  to June 2002. Data for these indicators are gathered by the Field...

303

1Q CY2002 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

The Facility Representive Program Performance Indicators (PIs) Quarterly Report is attached covering the period from January  to March  2002. Data for these indicators are gathered by the Field...

304

3Q CY2010 (PDF), Facility Representative Program Performance Indicators Quarterly Report  

Energy.gov (U.S. Department of Energy (DOE))

This memorandum summarizes the highlights of the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period of July through September 2010. Data for these...

305

EIS-0463: Extension of Scoping Period | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Extension of Scoping Period Extension of Scoping Period EIS-0463: Extension of Scoping Period Presidential Permit Application for Northern Pass Transmission, New Hampshire The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). In anticipation of additional alternative route information being provided by Northern Pass, DOE is reopening the scoping period. DOE will determine the close of the scoping period once the additional routing information is received from Northern Pass, and DOE will provide at least 45 days for public review and scoping comments on any such routing information. EIS-0463-ScopingExtension-2011.pdf More Documents & Publications Application for presidential permit OE Docket No. PP-371 Northern Pass

306

EIS-0463: Reopening of Scoping Period for the Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reopening of Scoping Period for the Environmental Impact Reopening of Scoping Period for the Environmental Impact Statement EIS-0463: Reopening of Scoping Period for the Environmental Impact Statement Northern Pass Transmission Line Project The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). The scoping period now ends on June 14, 2011. Reopening of Scoping Period for the Northern Pass Transmission Line Project Environmental Impact Statement, EIS-0463 (April 2011) (76 FR 21338) More Documents & Publications EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0425: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0448: Notice of Adoption of an Environmental Impact Statement

307

EIS-0463: Reopening of Scoping Period for the Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

463: Reopening of Scoping Period for the Environmental Impact 463: Reopening of Scoping Period for the Environmental Impact Statement EIS-0463: Reopening of Scoping Period for the Environmental Impact Statement Northern Pass Transmission Line Project The U.S. Department of Energy (DOE) is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). The scoping period now ends on June 14, 2011. Reopening of Scoping Period for the Northern Pass Transmission Line Project Environmental Impact Statement, EIS-0463 (April 2011) (76 FR 21338) More Documents & Publications EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0469: Notice of Intent To Prepare an Environmental Impact Statement and

308

Can Bohmian trajectories account for quantum recurrences having classical periodicities?  

E-Print Network (OSTI)

Quantum systems in specific regimes display recurrences at the period of the periodic orbits of the corresponding classical system. We investigate the excited hydrogen atom in a magnetic field -- a prototypical system of 'quantum chaos' -- from the point of view of the de Broglie Bohm (BB) interpretation of quantum mechanics. The trajectories predicted by BB theory are computed and contrasted with the time evolution of the wavefunction, which shows pronounced features at times matching the period of closed orbits of the classical hydrogen in a magnetic field problem. Individual BB trajectories do not possess these periodicities and cannot account for the quantum recurrences. These recurrences can however be explained by BB theory by considering the ensemble of trajectories compatible with an initial statistical distribution, although none of the trajectories of the ensemble are periodic, rendering unclear the dynamical origin of the classical periodicities.

A. Matzkin

2006-07-14T23:59:59.000Z

309

The Laboratory Performance Appraisal Process and Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Modification No. 0164 Appendix B i ATTACHMENT J.2 APPENDIX B PERFORMANCE EVALUATION MEASUREMENT PLAN (PEMP) Applicable to the Operation of Ames Laboratory Contract No....

310

EIS-0489: Notice of Comment Period Extension and Additional Scoping...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meetings EIS-0489: Notice of Comment Period Extension and Additional Scoping Meetings Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project...

311

Guidance on the Required Period for Grantees to Obligate Funds...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on the Required Period for Grantees to Obligate Funds and the Procedures for Reporting of Obligated Funds for the Energy Efficiency Conservation Block Grant (EECBG) Program...

312

DURING THIS REPORTING PERIOD, WE ISSUED 45 REPORTS; IDENTIFIED...  

Energy Savers (EERE)

components that have a limited lifetime due to their use of tritium, a radioactive gas which decays over time. Periodic replacement of these components is necessary to...

313

EIS-0369: Notice of Public Comment Period Extension and Additional...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Public Comment Period Extension and Additional Public Meeting Supplemental Yucca Mountain Rail Corridor and Rail Alignment The Department of Energy is now announcing...

314

Green's function analysis of periodic structures in computational electromagnetics  

E-Print Network (OSTI)

the two-dimensional periodic Green's function," IEEE Trans.evaluation of the Green's function for the Helmholtzrepresentations of certain Green's functions," J. Comp.

Van Orden, Derek

2011-01-01T23:59:59.000Z

315

Microsoft Word - PARS II Process Document - Close Period 2013...  

Office of Environmental Management (EM)

the process of preparing the APM Deputy Secretary Monthly Report and closing the DOE Reporting Period in PARS II. SCOPE This process applies to the Headquarters Office of...

316

Periodic Boundary Conditions in the ALEGRA Finite Element Code  

SciTech Connect

This document describes the implementation of periodic boundary conditions in the ALEGRA finite element code. ALEGRA is an arbitrary Lagrangian-Eulerian multi-physics code with both explicit and implicit numerical algorithms. The periodic boundary implementation requires a consistent set of boundary input sets which are used to describe virtual periodic regions. The implementation is noninvasive to the majority of the ALEGRA coding and is based on the distributed memory parallel framework in ALEGRA. The technique involves extending the ghost element concept for interprocessor boundary communications in ALEGRA to additionally support on- and off-processor periodic boundary communications. The user interface, algorithmic details and sample computations are given.

AIDUN,JOHN B.; ROBINSON,ALLEN C.; WEATHERBY,JOE R.

1999-11-01T23:59:59.000Z

317

Anode performance | EMSL  

NLE Websites -- All DOE Office Websites (Extended Search)

Anode performance New hybrid anode design to improve long-term performance of batteries PNNL researchers have developed a hybrid anode made of graphite and lithium that...

318

Management and Performance PERFORMANCE REPORTING AND PLANNING  

E-Print Network (OSTI)

AND PLANNING M&P-144 the Agency's workforce is well informed of major Agency initiatives and human capitalManagement and Performance PERFORMANCE REPORTING AND PLANNING M&P-143 Strategic Goal 5: Enable.1: IDENTIFY, CULTIVATE, AND SUSTAIN A DIVERSE WORKFORCE AND INCLUSIVE WORK ENVIRONMENT THAT IS NEEDED

319

Dual periodicities in the rotational modulation of Saturn narrowband emissions  

E-Print Network (OSTI)

Dual periodicities in the rotational modulation of Saturn narrowband emissions S.Y. Ye,1 D. A emissions is examined, restricting the spacecraft location to either the northern or the southern hemisphere of Saturn. It is found that in both hemispheres, the modulation period of 5 kHz narrowband emissions has two

Gurnett, Donald A.

320

Quantum coherent switch utilizing commensurate nanoelectrode and charge density periodicities  

DOE Patents (OSTI)

A quantum coherent switch having a substrate formed from a density wave (DW) material capable of having a periodic electron density modulation or spin density modulation, a dielectric layer formed onto a surface of the substrate that is orthogonal to an intrinsic wave vector of the DW material; and structure for applying an external spatially periodic electrostatic potential over the dielectric layer.

Harrison, Neil (Santa Fe, NM); Singleton, John (Los Alamos, NM); Migliori, Albert (Santa Fe, NM)

2008-08-05T23:59:59.000Z

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Another look at periodic wavelets Brody Dylan Johnson  

E-Print Network (OSTI)

Another look at periodic wavelets Brody Dylan Johnson St. Louis University 16 May 2009 Brody Dylan Johnson (St. Louis University) Another look at periodic wavelets 16 May 2009 1 / 31 #12;Overview Overview. (see, e.g., the texts of Meyer and Daubechies) Brody Dylan Johnson (St. Louis University) Another look

Johnson, Brody Dylan

322

Photonic bandgaps of periodic multilayers with diffuse interfaces  

E-Print Network (OSTI)

of the locations and widths of the forbidden bandgaps is standard [1­3]. However, generally the interfaces betweenPhotonic bandgaps of periodic multilayers with diffuse interfaces Jean-Michel André* , Philippe-michel.andre1@upmc.fr The photonic bandgap of periodic multilayers with diffuse interface is calculated

Boyer, Edmond

323

Observable coherence theory for statistically periodic fields Brynmor J. Davis*  

E-Print Network (OSTI)

Observable coherence theory for statistically periodic fields Brynmor J. Davis* The Beckman processes is used to develop classical coherence theory for the measurement of statistically periodicRevA.76.043843 PACS number s : 42.25.Kb, 42.60.Mi, 42.65.Re I. INTRODUCTION Coherence theory 1

Bhargava, Rohit

324

BOTT PERIODICITY AND THE INDEX OF ELLIPTIC OPERATORS  

Science Journals Connector (OSTI)

......Articles BOTT PERIODICITY AND THE INDEX OF ELLIPTIC OPERATORS M. F...University BOTT PERIODICITY AND THE INDEX OF ELLIPTIC OPERATORS By M...Equivariant JT-theory and completion' (to appear). 9. M. F...and I. M. Singer, 'The index of elliptio operators I......

M. F. ATIYAH

1968-01-01T23:59:59.000Z

325

Insecticides and my Osmia cornifrons Nesting Container Nesting Period  

E-Print Network (OSTI)

Insecticides and my Osmia cornifrons Nesting Container Nesting Period The Osmia cornifrons nesting male offspring. The end caps of nesting tubes made by older females are thin and weak, and they tend to break easily. In addition, near the end of the nesting period the numbers of parasites and predators

326

EIS-0431: Extension of Public Comment Period | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31: Extension of Public Comment Period 31: Extension of Public Comment Period EIS-0431: Extension of Public Comment Period Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, CA The U.S. Department of Energy (DOE) published a notice of availability on July 22, 2013 (78 FR 43870) that provided for a comment period ending September 3, 2013. DOE is extending the public comment period to October 1, 2013, and announces public hearings for the Hydrogen Energy California's Integrated Gasification Combined Cycle Project Preliminary Staff Assessment/Draft Environmental Impact Statement (PSA/DEIS; DOE/EIS--0431D; 78 FR 52764). The PSA/DEIS is available on the internet at http://www.energy.gov/nepa/downloads/eis-0431-draft-environmental-impact-statement

327

EIS-0431: Extension of Public Comment Period | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Public Comment Period Public Comment Period EIS-0431: Extension of Public Comment Period Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, CA The U.S. Department of Energy (DOE) published a notice of availability on July 22, 2013 (78 FR 43870) that provided for a comment period ending September 3, 2013. DOE is extending the public comment period to October 1, 2013, and announces public hearings for the Hydrogen Energy California's Integrated Gasification Combined Cycle Project Preliminary Staff Assessment/Draft Environmental Impact Statement (PSA/DEIS; DOE/EIS--0431D; 78 FR 52764). The PSA/DEIS is available on the internet at http://www.energy.gov/nepa/downloads/eis-0431-draft-environmental-impact-statement or on the CEC electronic docket site at

328

Department of Energy Extends Public Comment Period | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Extends Public Comment Period Department of Energy Extends Public Comment Period Department of Energy Extends Public Comment Period September 29, 2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 In response to public comments and requests, the U.S. Department of Energy National Nuclear Security Administration Nevada Site Office is extending the public comment period for the Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada. The formal comment period will close on December 2, 2011, rather than October 27. Within the draft SWEIS, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office presents a formal analysis of

329

Department of Energy Extends Public Comment Period | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Extends Public Comment Period Department of Energy Extends Public Comment Period Department of Energy Extends Public Comment Period September 29, 2011 - 12:00pm Addthis Media Contacts Darwin J. Morgan morgan@nv.doe.gov 702-295-3521 Kelly K. Snyder snyderk@nv.doe.gov 702-295-3521 In response to public comments and requests, the U.S. Department of Energy National Nuclear Security Administration Nevada Site Office is extending the public comment period for the Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada. The formal comment period will close on December 2, 2011, rather than October 27. Within the draft SWEIS, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office presents a formal analysis of

330

1Q CY2012 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1Q CY2012 (PDF), Facility Representative Program Performance 1Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report 1Q CY2012 (PDF), Facility Representative Program Performance Indicators Quarterly Report This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from January through March 2012. Data for these indicators were gathered by Field elements per Department of Energy (DOE) Technical Standarf 1063-2011, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. Facility Representative Program Performance Indicators for January-March 2012 More Documents & Publications 1Q CY2011 (PDF), Facility Representative Program Performance Indicators

331

3Q CY2011 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2011 (PDF), Facility Representative Program Performance 3Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2011 (PDF), Facility Representative Program Performance Indicators Quarterly Report This memorandum summarizes the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the Period July through September 2011. Data for these indicators were gathered by Field Elements per Department of Energy's (DOE) Technical Standard (STD) 1063-2011, Facility Representatives, and reported to Headquarters Program Offices for evaluation and feedback to improve the FR Program. Facility Representative Program Performance Indicators for July - September 2011 More Documents & Publications 3Q CY2010 (PDF), Facility Representative Program Performance Indicators

332

SR0018  

NLE Websites -- All DOE Office Websites (Extended Search)

Rick Ford (803) 725-2889 Wackenhut Receives Award Fee Flag Ribbon Graphic The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services,...

333

SR0008  

NLE Websites -- All DOE Office Websites (Extended Search)

Wachenhut Receives Award Fee Flag Ribbon Art Note to Editors and News Directors The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut...

334

Planar resonant periodic orbits in Kuiper belt dynamics  

E-Print Network (OSTI)

In the framework of the planar restricted three body problem we study a considerable number of resonances associated to the Kuiper Belt dynamics and located between 30 and 48 a.u. Our study is based on the computation of resonant periodic orbits and their stability. Stable periodic orbits are surrounded by regular librations in phase space and in such domains the capture of trans-Neptunian object is possible. All the periodic orbits found are symmetric and there is evidence for the existence of asymmetric ones only in few cases. In the present work first, second and third order resonances are under consideration. In the planar circular case we found that most of the periodic orbits are stable. The families of periodic orbits are temporarily interrupted by collisions but they continue up to relatively large values of the Jacobi constant and highly eccentric regular motion exists for all cases. In the elliptic problem and for a particular eccentricity value of the primary bodies the periodic orbits are isolated. The corresponding families, where they belong to, bifurcate from specific periodic orbits of the circular problem and seem to continue up to the rectilinear problem. Both stable and unstable orbits are obtained for each case. In the elliptic problem the unstable orbits found are associated with narrow chaotic domains in phase space. The evolution of the orbits, which are located in such chaotic domains, seems to be practically regular and bounded for long time intervals.

George Voyatzis; Thomas Kotoulas

2005-02-28T23:59:59.000Z

335

Ultrafast laser induced periodic sub-wavelength aluminum surface structures and nanoparticles in air and liquids  

SciTech Connect

In this communication, we demonstrate the generation of laser-induced periodic sub-wavelength surface structures (LIPSS) or ripples on a bulk aluminum (Al) and Al nanoparticles (NPs) by femtosecond (fs) laser direct writing technique. Laser irradiation was performed on Al surface at normal incidence in air and by immersing in ethanol (C{sub 2}H{sub 5}OH) and water (H{sub 2}O) using linearly polarized Ti:sapphire fs laser pulses of ?110 fs pulse duration and ?800?nm wavelength. Field emission scanning electron microscope is utilized for imaging surface morphology of laser written structures and it reveals that the spatial periodicity as well as the surface morphology of the LIPSS depends on the surrounding dielectric medium and also on the various laser irradiation parameters. The observed LIPSS have been classified as low spatial frequency LIPSS which are perpendicularly oriented to the laser polarization with a periodicity from 460 to 620?nm and high spatial frequency LIPSS which spectacles a periodicity less than 100?nm with the orientation parallel to the polarization of the incident laser beam. Fabricated colloidal solutions, which contain the Al NPs, were characterized by UV-Vis absorption spectroscopy and transmission electron microscopy (TEM). TEM results reveal the formation of internal cavities in Al NPs both in ethanol and water. Formation mechanism of LIPSS and cavities inside the nanoparticles are discussed in detail.

Kuladeep, Rajamudili; Dar, Mudasir H.; Rao, D. Narayana, E-mail: dnrsp@uohyd.ac.in, E-mail: dnr-laserlab@yahoo.com [School of Physics, University of Hyderabad, Hyderabad 500046 (India); Deepak, K. L. N. [Department of Physics and Center for Research in Photonics, University of Ottawa, 150 Louis Pasteur, Ottawa K1N6N5, Ontario (Canada)

2014-09-21T23:59:59.000Z

336

Global Clock, Physical Time Order and Pending Period Analysis in Multiprocessor Systems  

E-Print Network (OSTI)

In multiprocessor systems, various problems are treated with Lamport's logical clock and the resultant logical time orders between operations. However, one often needs to face the high complexities caused by the lack of logical time order information in practice. In this paper, we utilize the \\emph{global clock} to infuse the so-called \\emph{pending period} to each operation in a multiprocessor system, where the pending period is a time interval that contains the performed time of the operation. Further, we define the \\emph{physical time order} for any two operations with disjoint pending periods. The physical time order is obeyed by any real execution in multiprocessor systems due to that it is part of the truly happened operation orders restricted by global clock, and it is then proven to be independent and consistent with traditional logical time orders. The above novel yet fundamental concepts enables new effective approaches for analyzing multiprocessor systems, which are named \\emph{pending period analy...

Chen, Yunji; Hu, Weiwu

2009-01-01T23:59:59.000Z

337

On Line Power Plant Performance Monitoring  

E-Print Network (OSTI)

in achieving the best operation of the plant 3. To evaluate component performance and deterioration for use in a maintenance program 4. To develop cost data and incremental cost characteristics for the economic operation or dispatch of the unit... ? Analyze current plant?eQuipment status and diagnostics for preventive maintenance and equipment damage ? Provide current energy management and system dispatch operation information ? Capability for plant and equipment acceptance and periodic...

Ahner, D. J.; Priestley, R. R.

338

Hopper Performance and Optimization  

NLE Websites -- All DOE Office Websites (Extended Search)

Optimization Optimization Performance and Optimization Compiler Comparisons Comparison of different compilers with different options on several benchmarks. Read More » Using OpenMP Effectively Performance implications and case studies of codes combining MPI and OpenMP Read More » Reordering MPI Ranks Reordering MPI ranks can result in improved application performance depending on the communication patterns of the application. Read More » Application Performance Variability on Hopper How an application is placed across Hopper's roughly 6300 compute nodes can affect its performance. See a study of application runtimes vs node placement. Read More » Hopper Performance Monitoring Benchmarking performance of scientific applications on Hopper Read More » Hopper:Improving I/O performance to GSCRATCH and PROJECT

339

Performance and Reliability of Quantum Cascade Lasers  

SciTech Connect

We present the burn-in behavior and power stability of multiple quantum cascade lasers (QCLs) that were measured to investigate their long-term performance. For these experiments, the current to the QCL was cycled every ten minutes, and the output power was monitored over time for durations as long as two months. A small increase in power for a given injection current is observed for almost all of the QCLs tested during the burn-in period. The data from these experiments will be presented along with the effects of packaging the QCLs to determine the impact on performance and reliability.

Myers, Tanya L.; Cannon, Bret D.; Taubman, Matthew S.; Bernacki, Bruce E.

2013-05-01T23:59:59.000Z

340

Sustainability Performance Office | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Sustainability Performance Office Sustainability Performance Office Sustainability Performance Office Sustainability Performance Office Sustainability Performance Office...

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Buildings Performance Database Overview  

Energy.gov (U.S. Department of Energy (DOE))

Buildings Performance Database Overview, from the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

342

Performance Tested Comfort Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Showerheads Residential Weatherization Performance Tested Comfort Systems Ductless Heat Pumps New Construction Residential Marketing Toolkit Retail Sales Allocation Tool...

343

DOE Media Advisory - DOE extends public comment period on Draft  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Media Advisory - DOE extends public comment period on Draft Media Advisory - DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site DOE Media Advisory - DOE extends public comment period on Draft Environmental Assessment for Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the U.S. Department of Energy's Idaho Site October 13, 2011 - 12:00pm Addthis Media Contact Tim Jackson 208-526-8484 In response to requests from people interested in National Environmental Policy Act activities occurring at the U.S. Department of Energy's Idaho Operations Office, the department has extended the public comment period that began September 1 on the Draft Environmental Assessment for

344

Property:Building/EndPeriod | Open Energy Information  

Open Energy Info (EERE)

EndPeriod EndPeriod Jump to: navigation, search This is a property of type Date. End of the period (last day of the month) Pages using the property "Building/EndPeriod" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 1 December 2004 + Sweden Building 05K0002 + 1 December 2004 + Sweden Building 05K0003 + 1 December 2004 + Sweden Building 05K0004 + 1 December 2004 + Sweden Building 05K0005 + 1 September 2005 + Sweden Building 05K0006 + 1 September 2005 + Sweden Building 05K0007 + 1 September 2005 + Sweden Building 05K0008 + 1 September 2005 + Sweden Building 05K0009 + 1 September 2005 + Sweden Building 05K0010 + 1 September 2005 + Sweden Building 05K0011 + 1 September 2005 + Sweden Building 05K0012 + 1 December 2004 +

345

Extension of Comment Period on the Draft Integrated, Interagency  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Extension of Comment Period on the Draft Integrated, Interagency Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations September 25, 2013 - 4:24pm Addthis On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. An announcement extending the public comment period for submitting comments regarding the IIP Process was published in the Federal Register on

346

Application Periods Open for 2014 National Clean Energy Business Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Periods Open for 2014 National Clean Energy Business Application Periods Open for 2014 National Clean Energy Business Plan Competition's Regional Contests Application Periods Open for 2014 National Clean Energy Business Plan Competition's Regional Contests November 14, 2013 - 5:05pm Addthis The Energy Department today announced the opening of the application periods for six regional competitions that are part of the 2014 U.S. Department of Energy National Clean Energy Business Plan Competition. The competition aims to inspires university teams and promote entrepreneurship in clean energy technologies that will boost American competitiveness, bring cutting-edge clean energy solutions to the market, and strengthen our economic prosperity. The National Clean Energy Business Plan Competition challenges university

347

Property:Building/StartPeriod | Open Energy Information  

Open Energy Info (EERE)

StartPeriod StartPeriod Jump to: navigation, search This is a property of type Date. Start of the period (first day o the month) Pages using the property "Building/StartPeriod" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 1 January 2004 + Sweden Building 05K0002 + 1 January 2004 + Sweden Building 05K0003 + 1 January 2004 + Sweden Building 05K0004 + 1 January 2004 + Sweden Building 05K0005 + 1 October 2004 + Sweden Building 05K0006 + 1 October 2004 + Sweden Building 05K0007 + 1 October 2004 + Sweden Building 05K0008 + 1 October 2004 + Sweden Building 05K0009 + 1 October 2004 + Sweden Building 05K0010 + 1 October 2004 + Sweden Building 05K0011 + 1 October 2004 + Sweden Building 05K0012 + 1 January 2004 + Sweden Building 05K0013 + 1 October 2004 +

348

The orbital period distribution of subdwarf B binaries  

E-Print Network (OSTI)

We present the results of a 3.5 year long campaign to measure orbital periods of subdwarf B (sdB) star binaries. We directly compare our observed orbital period distribution with that predicted by using binary population synthesis. Up to now, most of our systems seem to have been formed through two of the formation channels discussed by Han et al.(2003), i.e. the first and the second common envelope ejection (CE) channels. At this point, thanks to the long baseline of our observations, we are starting to detect also very long orbital period systems. These have probably come from a complete different formation path, the first stable Roche Lobe overflow (RLOF) channel in which the first mass transfer phase is stable. This channel is expected to lead to the formation of very wide binaries with orbital periods ranging between 0.5 to 2000 days.

L. Morales-Rueda; P. F. L. Maxted; T. R. Marsh

2003-09-03T23:59:59.000Z

349

Short-period seismic rotations and translations recorded by Rotaphone  

E-Print Network (OSTI)

-period Rotaphone records of events induced by natural and/or anthropogenic sources 31 5.1 Records of quarry blasts Rotation to translation relations 39 7 The problem of seismic translational components being contaminated

Cerveny, Vlastislav

350

Accepted by ApJ. Periodicities in Solar Flare Occurrence  

E-Print Network (OSTI)

that the periodicity near 154 days operated during cycles 19­21 (Lean & Brueckner 1989; Lean 1990; Oliver et al. 1998 of sunspot numbers generally agree with the results of sunspot area analyses (Lean & Brueckner 1989; Krivova

Bai, Taeil

351

Dynamic Scheduling of Skippable Periodic Tasks: Issues and Proposals  

E-Print Network (OSTI)

-Chetto and Audrey Marchand IRCCyN, University of Nantes, Nantes, FRANCE Email: {maryline.chetto, audrey.marchand Scheduling of Skippable Periodic Tasks in Weakly-Hard Real-Time Systems," by M. Silly-Chetto, and A. Marchand

Paris-Sud XI, Université de

352

Periodic solutions of Schrodinger equation in Hilbert space  

E-Print Network (OSTI)

Necessary and sufficient conditions for existence of boundary value problem of Schrodinger equation are obtained in linear and nonlinear cases. Periodic analytical solutions are represented using generalized Green's operator

A. A. Boichuk; A. A. Pokutnyi

2012-09-03T23:59:59.000Z

353

Modeling Maritime Culture: Galveston, Texas, in the Historic Period  

Science Journals Connector (OSTI)

...“Maritime cultural landscape” (MCL) can be applied as both a research framework and a theoretical inquiry into cultural interactions with the sea. The utility of MCL approaches in historic period archaeologica...

Matthew E. Keith; Amanda M. Evans

2011-01-01T23:59:59.000Z

354

Thermal equilibrium theory of periodically focused charged-particle beams  

E-Print Network (OSTI)

A thermal equilibrium theory of periodically focused charged-particle beams is presented in the framework of both warm-fluid and kinetic descriptions. In particular, the thermal beam equilibria are discussed for paraxial ...

Samokhvalova, Ksenia R

2008-01-01T23:59:59.000Z

355

Real-time Multi-period truckload routing problems  

E-Print Network (OSTI)

In this thesis we consider a multi-period truckload pick-up and delivery problem dealing with real-time requests over a finite time horizon. We introduce the notion of postponement of requests, whereby the company can ...

Limpaitoon, Tanachai

2008-01-01T23:59:59.000Z

356

Microsoft Word - DOE News Release - Public Comment Period Extended...  

NLE Websites -- All DOE Office Websites (Extended Search)

Period on Proposed Cleanup Plans Extended 60 Days On Oct. 31, 2014 the U.S. Department of Energy (DOE) released two formal Proposed Plans for the decontamination and...

357

Application Periods Open for 2014 National Clean Energy Business Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Periods Open for 2014 National Clean Energy Business Application Periods Open for 2014 National Clean Energy Business Plan Competition's Regional Contests Application Periods Open for 2014 National Clean Energy Business Plan Competition's Regional Contests November 14, 2013 - 5:05pm Addthis The Energy Department today announced the opening of the application periods for six regional competitions that are part of the 2014 U.S. Department of Energy National Clean Energy Business Plan Competition. The competition aims to inspires university teams and promote entrepreneurship in clean energy technologies that will boost American competitiveness, bring cutting-edge clean energy solutions to the market, and strengthen our economic prosperity. The National Clean Energy Business Plan Competition challenges university

358

Realtime controller tuning for periodic disturbance rejection with application to active noise control  

E-Print Network (OSTI)

de Callafon. Scheduling control for periodic disturbance at-de Callafon, “Scheduling Control for Periodic DisturbanceR.A. de Callafon, “Scheduling Control for Periodic Distur-

Kinney, Charles E.

2009-01-01T23:59:59.000Z

359

High Performance Home Cost Performance Trade-Offs: Production...  

Energy Savers (EERE)

High Performance Home Cost Performance Trade-Offs: Production Builders - Building America Top Innovation High Performance Home Cost Performance Trade-Offs: Production Builders -...

360

Performance Computing with  

E-Print Network (OSTI)

High Performance Computing with Iceberg. Mike Griffiths Bob Booth November 2005 AP-Unix4 © University of Sheffield #12;Bob Booth High Performance Computing with Iceberg Contents 1. REVIEW OF AVAILABLE 23 7.1 USING FUSE TO MOUNT FILE SYSTEMS ON ICEBERG 23 2 #12;Bob Booth High Performance Computing

Martin, Stephen John

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

High Performance Computing in  

E-Print Network (OSTI)

High Performance Computing in Bioinformatics Thomas Ludwig (t.ludwig@computer.org) Ruprecht PART I: High Performance Computing Thomas Ludwig PART II: HPC Computing in Bioinformatics Alexandros #12;© Thomas Ludwig, Alexandros Stamatakis, GCB'04 3 PART I High Performance Computing Introduction

Stamatakis, Alexandros

362

Internet Performance Measurement Collaborators  

E-Print Network (OSTI)

Internet Performance Measurement Collaborators Cross Industry Working Team (XIWT) High Performance of the timestamp mechanism in the ANS Surveyor Probe device FY98 · GITS Internet Performance Measurement Toolkit developed FY99 · GITS measurement systems deployed in the field FY00 Goal To advance the state of the art

363

IR DIAL performance modeling  

SciTech Connect

We are developing a DIAL performance model for CALIOPE at LLNL. The intent of the model is to provide quick and interactive parameter sensitivity calculations with immediate graphical output. A brief overview of the features of the performance model is given, along with an example of performance calculations for a non-CALIOPE application.

Sharlemann, E.T.

1994-07-01T23:59:59.000Z

364

An Autonomous Adaptive Scheduling Agent for Period Searching  

E-Print Network (OSTI)

We describe the design and implementation of an autonomous adaptive software agent that addresses the practical problem of observing undersampled, periodic, time-varying phenomena using a network of HTN-compliant robotic telescopes. The algorithm governing the behaviour of the agent uses an optimal geometric sampling technique to cover the period range of interest, but additionally implements proactive behaviour that maximises the optimality of the dataset in the face of an uncertain and changing operating environment.

Eric S. Saunders; Tim Naylor; Alasdair Allan

2008-01-24T23:59:59.000Z

365

Prominence seismology using the period ratio of transverse thread oscillations  

E-Print Network (OSTI)

The ratio of the period of the fundamental mode to that of the first overtone of kink oscillations, from here on the "period ratio", is a seismology tool that can be used to infer information about the spatial variation of density along solar magnetic flux tubes. The period ratio is 2 in longitudinally homogeneous thin tubes, but it differs from 2 due to longitudinal inhomogeneity. In this paper we investigate the period ratio in longitudinally inhomogeneous prominence threads and explore its implications for prominence seismology. We numerically solve the two-dimensional eigenvalue problem of kink oscillations in a model of a prominence thread. We take into account three nonuniform density profiles along the thread. In agreement with previous works that used simple piecewise constant density profiles, we find that the period ratio is larger than 2 in prominence threads. When the ratio of the central density to that at the footpoints is fixed, the period ratio depends strongly on the form of the density profi...

Soler, R; Ballester, J L

2015-01-01T23:59:59.000Z

366

Observations of long period earthquakes accompanying hydraulic fracturing  

SciTech Connect

Waveforms of most seismic events accompanying hydraulic fracturing have been reported to contain clear P and S waves and have fault plane solutions consistent with shear displacement across a fault. This observation is surprising since classical hydraulic fracturing theory predicts the creation of a tensile opening of a cavity in response to fluid pressure. Very small long period events, similar to long period earthquakes observed at volcanoes, were found to occur during four hydraulic fracturing experiments carried out at Fenton Hill, New Mexico. Since the long period earthquakes occur in the same region as the shear type events, it is concluded that the unusual character of the long period earthquake waveforms is due to a source effect and not a path effect. The occurrence of long period earthquakes during hydraulic fracturing could indicate tensile fracturing. Many waveforms of these events are identical, which implies that these events represent repeated activation of a given source. A proposed source for these long period events is the sudden opening of a channel that connects two cracks filled with fluid at different pressures. The sizes of the two cracks differ, which causes two or more peaks to appear in the spectra, each peak being associated with one physical dimension of each crack. From the frequencies at which spectral peaks occur, crack lengths are estimated to be between 3 and 20m.

Bame, D.; Fehler, M.

1986-02-01T23:59:59.000Z

367

Performance Engineering Technology for Scientific Component Software  

SciTech Connect

Large-scale, complex scientific applications are beginning to benefit from the use of component software design methodology and technology for software development. Integral to the success of component-based applications is the ability to achieve high-performing code solutions through the use of performance engineering tools for both intra-component and inter-component analysis and optimization. Our work on this project aimed to develop performance engineering technology for scientific component software in association with the DOE CCTTSS SciDAC project (active during the contract period) and the broader Common Component Architecture (CCA) community. Our specific implementation objectives were to extend the TAU performance system and Program Database Toolkit (PDT) to support performance instrumentation, measurement, and analysis of CCA components and frameworks, and to develop performance measurement and monitoring infrastructure that could be integrated in CCA applications. These objectives have been met in the completion of all project milestones and in the transfer of the technology into the continuing CCA activities as part of the DOE TASCS SciDAC2 effort. In addition to these achievements, over the past three years, we have been an active member of the CCA Forum, attending all meetings and serving in several working groups, such as the CCA Toolkit working group, the CQoS working group, and the Tutorial working group. We have contributed significantly to CCA tutorials since SC'04, hosted two CCA meetings, participated in the annual ACTS workshops, and were co-authors on the recent CCA journal paper [24]. There are four main areas where our project has delivered results: component performance instrumentation and measurement, component performance modeling and optimization, performance database and data mining, and online performance monitoring. This final report outlines the achievements in these areas for the entire project period. The submitted progress reports for the first two years describe those year's achievements in detail. We discuss progress in the last project period in this document. Deployment of our work in CCA components, frameworks, and applications is an important metric of success. We also summarize the project's accomplishments in this regard at the end of the report. A list of project publications is also given.

Malony, Allen D.

2007-05-08T23:59:59.000Z

368

Contractor Past Performance Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2013) March 2013) 1 Contractor Performance Information This updated chapter incorporates the Office of Federal Procurement Policy (OFPP) policy that effective October 1, 2010, Contractor Performance Assessment Reporting System (CPARS) is the single government-wide feeder system for past performance information reporting. This chapter supplements the CPARS Guide and related user manuals for all modules available at the CPARS website. The CPARS Guide includes consistent processes and procedures for agencies to use when reporting on past performance information and should be read in conjunction with Federal Acquisition Regulation (FAR) Part 42.15 and other FAR Parts related to past performance information. When needed, this Acquisition Guide Chapter provides

369

ARM - 2008 Performance Metrics  

NLE Websites -- All DOE Office Websites (Extended Search)

8 Performance Metrics 8 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings User Meetings Annual Meetings of the Atmospheric System Research (ASR) Science Team and Fall Working Groups Accomplishments Read about the 20 years of accomplishments (PDF, 696KB) from the ARM Program and user facility. Performance Metrics ASR Metrics 2009 2008 2007 2006 2008 Performance Metrics Each year, the ARM Program must submit to DOE an overall performance measure related to scientific achievement. The overall performance measure includes specific metrics for reporting progress each quarter. This reporting process includes support documentation (usually a report or data file) appropriate for the metric. Overall Performance Measures

370

High Performance Computing  

NLE Websites -- All DOE Office Websites (Extended Search)

Information Science, Computing, Applied Math » Information Science, Computing, Applied Math » High Performance Computing High Performance Computing Providing world-class high performance computing capability that enables unsurpassed solutions to complex problems of strategic national interest Gary Grider High Performance Computing Division Leader Randal Rheinheimer High Performance Computing Deputy Division Leader Contact Us Carol Hogsett Student/Internship Opportunities Email Division Office Email Managing world-class supercomputing centers Powerall simulations modeling Read caption + The Powerwall is used by LANL scientists to view objects and processes in 3D. High Performance Computing video 13:01 Gary Grider, HPC Divison Leader The High Performance Computing (HPC) Division supports the Laboratory mission by managing world-class Supercomputing Centers.

371

Flexible facility design with stochastic data in multiple periods  

E-Print Network (OSTI)

potential to perform poorly for the worst case scenarios. Conversely, the new two-phase heuristic attempts to improve the worst case scenarios while maintaining good expected demand performance. In a situation where there is potential to encounter costly...

Prigge, Jami G.

2012-06-07T23:59:59.000Z

372

Ionized impurity scattering in periodically ?-doped InP  

Science Journals Connector (OSTI)

The quantum mobility in the individual minibands of InP with periodic Si ? doping was estimated from the Shubnikov–de Haas spectra of the samples, measured at 4.2 K in fields of 0–14 T. The set of samples studied had a sheet density of Si atoms of about 4.9×1012 cm-2 in each doped layer, and a doping period in the range 90–300 ?. A theoretical model for the quantum mobility in individual minibands was developed, and theoretical estimates of the quantum mobility are in reasonable agreement with the experimental values. It is observed that at a fixed doping period the quantum mobilities increase with the index of the miniband, and the quantum mobility in an individual miniband decreases when the doping period is made shorter. The dependence of the quantum mobility on the miniband index and doping periodicity correlates with the dependence of the mean distance between electrons and the doped layer on the same quantities. These results demonstrate that in ?-doped semiconductors the binding length of the quantum-confined electronic charge is a very important parameter, determining the carrier mobility which can be attained in these systems.

A. B. Henriques, L. C. D. Gon?calves, N. F. Oliveira Jr., P. L. Souza, and B. Yavich

1997-05-15T23:59:59.000Z

373

Cygnus Performance in Subcritical Experiments  

SciTech Connect

The Cygnus Dual Beam Radiographic Facility consists of two identical radiographic sources with the following specifications: 4-rad dose at 1 m, 1-mm spot size, 50-ns pulse length, 2.25-MeV endpoint energy. The facility is located in an underground tunnel complex at the Nevada Test Site. Here SubCritical Experiments (SCEs) are performed to study the dynamic properties of plutonium. The Cygnus sources were developed as a primary diagnostic for these tests. Since SCEs are single-shot, high-value events - reliability and reproducibility are key issues. Enhanced reliability involves minimization of failure modes through design, inspection, and testing. Many unique hardware and operational features were incorporated into Cygnus to insure reliability. Enhanced reproducibility involves normalization of shot-to-shot output also through design, inspection, and testing. The first SCE to utilize Cygnus, Armando, was executed on May 25, 2004. A year later, April - May 2005, calibrations using a plutonium step wedge were performed. The results from this series were used for more precise interpretation of the Armando data. In the period February - May 2007 Cygnus was fielded on Thermos, which is a series of small-sample plutonium shots using a one-dimensional geometry. Pulsed power research generally dictates frequent change in hardware configuration. Conversely, SCE applications have typically required constant machine settings. Therefore, while operating during the past four years we have accumulated a large database for evaluation of machine performance under highly consistent operating conditions. Through analysis of this database Cygnus reliability and reproducibility on Armando, Step Wedge, and Thermos is presented.

G. Corrow, M. Hansen, D. Henderson, S. Lutz, C. Mitton, et al.

2008-02-01T23:59:59.000Z

374

Math Library Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Math Library Performance Math Library Performance Math Library Performance Fully optimizing a given application's performance often requires a deep understand of the source, an accurate profile for a representative run and the ability to have changes to the source accepted upstream. However, in many cases, significant performance gains can be achieved by simply optimizing the code over the matrix of possible compilers, compiler options and libraries available on a given machine. Here, we explore the performance variability of common materials science applications at NERSC with respect to the compilers and libraries available on Edison, NERSC's Cray XC30. NERSC currently supports compilers from three different vendors on the XC30 system, Edison: Intel, GNU and Cray. Materials science applications

375

Buildings Performance Database  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Buildings Performance DOE Buildings Performance Database Paul Mathew Lawrence Berkeley National Laboratory pamathew@lbl.gov (510) 486 5116 April 3, 2013 Standard Data Spec API 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: * Large-scale high-quality empirical data on building energy performance is critical to support decision- making and increase confidence in energy efficiency investments. * While there are a many potential sources for such data,

376

Multi-Period Planning for Electric Car Charging Station Locations: a Case of Korean Expressways  

Science Journals Connector (OSTI)

Abstract One of the most critical barriers to widespread adoption of electric cars is the lack of charging station infrastructure. Although it is expected that a sufficient number of charging stations will be constructed eventually, due to various practical reasons they may have to be introduced gradually over time. In this paper, we formulate a multi-period optimization model based on a flow-refueling location model for strategic charging station location planning. We also propose two myopic methods and develop a case study based on the real traffic flow data of the Korean Expressway network in 2011. We discuss the performance of the three proposed methods.

Sung Hoon Chung; Changhyun Kwon

2014-01-01T23:59:59.000Z

377

Website link prediction using a Markov chain model based on multiple time periods  

Science Journals Connector (OSTI)

Growing size and complexity of many websites have made navigation through these sites increasingly difficult. Attempting to automatically predict the next page for a website user to visit has many potential benefits, for example in site navigation, automatic tour generation, adaptive web applications, recommendation systems, web server optimisation, web search and web pre-fetching. This paper describes an approach to link prediction using a Markov chain model based on an exponentially smoothed transition probability matrix which incorporates site usage statistics collected over multiple time periods. The improved performance of this approach compared to earlier methods is also discussed.

Shantha Jayalal; Chris Hawksley; Pearl Brereton

2007-01-01T23:59:59.000Z

378

Efficiency, power, and period at two optimum operations of a thermoelectric single-level quantum dot  

Science Journals Connector (OSTI)

We take a single-level quantum dot embedded between two metallic leads at different temperatures and chemical potentials which works as a heat engine. Two optimization criteria were used and their corresponding optimized efficiencies, powers, and periods evaluated. A comparison between similar quantities of the two optimization criteria reveals mixed advantages and disadvantages. We quantify the engine's overall performance by suggesting a figure of merit that takes into account the contribution of each of the three quantities. Based on the proposed figure of merit, one of the optimization criterion presents a clear advantage. This same criterion is found to be invariably advantageous when applied to three other representative models.

Fitsum Borga; Mulugeta Bekele; Yergou B. Tatek; Mesfin Tsige

2012-09-26T23:59:59.000Z

379

Guidelines for Performance Measurement  

Directives, Delegations, and Requirements

Federal agencies, states, businesses, and foreign governments are increasingly relying on performance measurement information to help chart progress in increasingly frugal times. No cancellations.

1996-06-30T23:59:59.000Z

380

Contractor Past Performance Information  

Office of Environmental Management (EM)

needs against market conditions. Requiring vendors to provide sufficient pricing usage, and performance data to enable the government to ensure we are receiving the best...

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Superior Energy Performance  

Energy.gov (U.S. Department of Energy (DOE))

Industrial facilities certified to Superior Energy Performance® (SEP™) are leaders in energy management. These facilities have met the ISO 50001 standard and have improved their energy performance up to 25% over three years or up to 40% over 10 years. SEP provides guidance, tools, and protocols to drive deeper, more sustained savings from ISO 50001. To become certified, facilities must implement an energy management system that meets the ISO 50001 standard and demonstrate improved energy performance. An independent third party audits each facility to verify achievements and qualify it at the Silver, Gold, or Platinum level, based on performance. This certification emphasizes measureable savings through a transparent process.

382

Contractor Past Performance Information  

Energy Savers (EERE)

and Project Management. Acquisition Guide ---Chapter 42.15 (September 2013) 4 PAST PERFORMANCE REPORTING AND FAPIIS DATA MANAGEMENT REPORTS Report Description...

383

Annual Performance Report  

Office of Legacy Management (LM)

left blank U.S. Department of Energy Annual Performance Report, Shiprock, New Mexico October 2014 Doc. No. S12021 Page i Contents Abbreviations ......

384

Occupational Safety Performance  

Office of Environmental Management (EM)

this report (July 2012). All data has not yet been submitted to CAIRS. 1 Occupational Safety Performance Comparable Industry, Average TRC Rate Comparable Industry, Average DART...

385

Performance and Optimization  

NLE Websites -- All DOE Office Websites (Extended Search)

Math Library Performance Core Specialization Hyper-Threading DLFM library tools for large scale dynamic applications Chapel Shared and Dynamic Libraries Cluster Compatibility Mode...

386

Automation Performance Index.  

E-Print Network (OSTI)

??Automation is intended to improve overall building performance. Building Automation Systems (BAS) are attractive and popular due to their promise of increased operational effectiveness. BAS… (more)

Makarechi, Shariar

2006-01-01T23:59:59.000Z

387

PDSF Performance and Optimization  

NLE Websites -- All DOE Office Websites (Extended Search)

Optimization Performance and Optimization Running Jobs Efficiently This page defines job efficiency and how to measure the efficiency of your jobs. Read More PDSF IO Monitoring...

388

Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

be performed to evaluate one of several alternative routings for the proposed natural gas pipeline. Commercial utility providers (primarily phone and fiber-optic lines) in...

389

MSC Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

is within 90- 100% of required tests - - - - - - - - - J17-1 SSE Operational Readiness Index - - - - - - - - - J18-1 SSE FY 2010 Hanford Training Baseline Performance...

390

.NET High Performance Computing.  

E-Print Network (OSTI)

?? Graphics Processing Units (GPUs) have been extensively applied in the High Performance Computing (HPC) community. HPC applications require additional special programming environments to improve… (more)

Ou, Hsuan-Hsiu

2012-01-01T23:59:59.000Z

391

DOE Extends Comment Period on Certification and Enforcement Notice of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Certification and Enforcement Notice Certification and Enforcement Notice of Proposed Rulemaking DOE Extends Comment Period on Certification and Enforcement Notice of Proposed Rulemaking October 15, 2010 - 10:22am Addthis In response to a formal request, the Department has extended to October 29, 2010, the deadline for submission of comments in response to the Notice or Proposed Rulemaking on the certification and enforcement of the Department's energy conservation standards. (75 FR 56796). The signed extension provided here will be published shortly in the Federal Register. Addthis Related Articles DOE Extends Comment Period on Notice of Inquiry Under the Energy Independence and Security Act DOE Extends Comment Period on Notice of Inquiry Under the Energy Independence and Security Act Department of Energy Issues Final Rule on Loan Guarantees

392

STAR Teaching Program Application Period | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STAR Teaching Program Application Period STAR Teaching Program Application Period STAR Teaching Program Application Period December 28, 2012 2:30PM EST to January 31, 2013 5:30PM EST Cal Poly The Science Teacher and Researcher (STAR) Researcher program, a collaborative project of California State University, provides pre-service and early career science teachers with eight week long paid mentor and research opportunities at a national research center. Applicants must have the following: A demonstrated interest in becoming a science or mathematics teacher at the secondary level (grades 6-12) Either a California State University (CSU) student OR NSF Noyce Scholar in the United States OR a STAR Alum with two or fewer years of participation AND two or fewer years of teaching experience (first time participants must be pre-service teachers, i.e., not yet teaching full-time

393

Estimating the Payback Period of Additional Insulation | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Payback Period of Additional Insulation the Payback Period of Additional Insulation Estimating the Payback Period of Additional Insulation June 24, 2012 - 1:17pm Addthis Adding insulation in the attic of an existing home often results in a favorable payback. | Photo courtesy of Lieko Earle, NREL PIX 19612. Adding insulation in the attic of an existing home often results in a favorable payback. | Photo courtesy of Lieko Earle, NREL PIX 19612. What does this mean for me? Even if you hire a contractor to do the work, adding insulation to your home will likely have an attractive payback. If you can gather the information and plug it into an equation, you can determine the payback of adding insulation to your home. Use the equation below to estimate the cost effectiveness of adding insulation in terms of the "years to payback" for savings in heating costs.

394

Notice of extension of public comment period for reply comments. |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of extension of public comment period for reply comments. Notice of extension of public comment period for reply comments. Notice of extension of public comment period for reply comments. On July 27, 2010, the Department of Energy (DOE) published in the Federal Register a notice of inquiry (NOI) and request for comment from the public in its development of regulations pertaining to section 934, of the Energy Independence and Security Act of 2007 (''Act''). Section 934 addresses how the United States will meet its obligations under the Convention for Supplementary Compensation for Nuclear Damage (''CSC'') including its obligation to contribute to an international supplementary fund in the event of certain nuclear incidents.The NOI provided a September 27, 2010, deadline for comments, which was subsequently extended to October 27, 2010 in response to a public

395

Department of Energy Announces Plans for Additional Comment Period on  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Plans for Additional Comment Period Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors November 9, 2006 - 9:38am Addthis Under Section 1221(a) of the Energy Policy Act of 2005, the Department of Energy must issue a report based on the Department's August 8 Congestion Study. In that report, the Secretary may designate as a "national interest electric transmission corridor" (National Corridor) any geographic area experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers. After issuing the August 8 Congestion Study, the Department invited public comment and received comments on the study from a variety of entities

396

Notice of extension of public comment period for reply comments. |  

NLE Websites -- All DOE Office Websites (Extended Search)

extension of public comment period for reply comments. extension of public comment period for reply comments. Notice of extension of public comment period for reply comments. On July 27, 2010, the Department of Energy (DOE) published in the Federal Register a notice of inquiry (NOI) and request for comment from the public in its development of regulations pertaining to section 934, of the Energy Independence and Security Act of 2007 (''Act''). Section 934 addresses how the United States will meet its obligations under the Convention for Supplementary Compensation for Nuclear Damage (''CSC'') including its obligation to contribute to an international supplementary fund in the event of certain nuclear incidents.The NOI provided a September 27, 2010, deadline for comments, which was subsequently extended to October 27, 2010 in response to a public

397

Clock-controlled generators with large period output sequences  

Science Journals Connector (OSTI)

Clock-controlled generators are a kind of pseudo-random number generators (PRNG). Recently, some clock-controlled generators based on jumping Linear Finite State Machines (LFSMs) have been proposed, such as Pomaranch and MICKEY. The period and the linear complexity of their output sequences need to be large enough to provide security against linear attacks. In this paper, a new condition for the period to reach its maximal value is presented. The condition is better than the previous one. Further, some clock-controlled generators are considered, including a new generator which uses a Feedback with Carry Shift Register (FCSR) as the control register. How to maximise the period of their output sequences is investigated.

Zhiqiang Lin

2014-01-01T23:59:59.000Z

398

Periodic Discrete Energy for Long-Range Potentials  

E-Print Network (OSTI)

We consider periodic energy problems in Euclidean space with a special emphasis on long-range potentials that cannot be defined through the usual infinite sum. One of our main results builds on more recent developments of Ewald summation to define the periodic energy corresponding to a large class of long-range potentials. Two particularly interesting examples are the logarithmic potential and the Riesz potential when the Riesz parameter is smaller than the dimension of the space. For these examples, we use analytic continuation methods to provide concise formulas for the periodic kernel in terms of the Epstein Hurwitz Zeta function. We apply our energy definition to deduce several properties of the minimal energy including the asymptotic order of growth and the distribution of points in energy minimizing configurations as the number of points becomes large. We conclude with some detailed calculations in the case of one dimension, which shows the utility of this approach.

D. P. Hardin; E. B. Saff; Brian Simanek

2014-12-11T23:59:59.000Z

399

Estimating the Payback Period of Additional Insulation | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Estimating the Payback Period of Additional Insulation Estimating the Payback Period of Additional Insulation Estimating the Payback Period of Additional Insulation June 24, 2012 - 1:17pm Addthis Adding insulation in the attic of an existing home often results in a favorable payback. | Photo courtesy of Lieko Earle, NREL PIX 19612. Adding insulation in the attic of an existing home often results in a favorable payback. | Photo courtesy of Lieko Earle, NREL PIX 19612. What does this mean for me? Even if you hire a contractor to do the work, adding insulation to your home will likely have an attractive payback. If you can gather the information and plug it into an equation, you can determine the payback of adding insulation to your home. Use the equation below to estimate the cost effectiveness of adding insulation in terms of the "years to payback" for savings in heating costs.

400

Performance Confirmation Plan  

SciTech Connect

As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that i s affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program.

Lindner, E.N.

2000-05-19T23:59:59.000Z

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Gravitational Waves from Periodic Three-Body Systems  

E-Print Network (OSTI)

Three bodies moving in a periodic orbit under the influence of Newtonian gravity ought to emit gravitational waves. We have calculated the gravitational radiation quadrupolar waveforms and the corresponding luminosities for the 13+11 recently discovered three-body periodic orbits in Newtonian gravity. These waves clearly allow one to distinguish between their sources: all 13+11 orbits have different waveforms and their luminosities (evaluated at the same orbit energy and body mass) vary by up to 13 orders of magnitude in the mean, and up to 20 orders of magnitude for the peak values.

Dmitrašinovi?, V; Hudomal, Ana

2015-01-01T23:59:59.000Z

402

Truncation of Periodic Image Interactions for Confined Systems  

E-Print Network (OSTI)

First principles methods based on periodic boundary conditions are used extensively by materials theorists. However, applying these methods to systems with confined electronic states entails the use of large unit cells in order to avoid artificial image interactions. We present a general approach for truncating the Coulomb interaction that removes image effects directly and leads to well converged results for modest-sized periodic cells. As an illustration, we find the lowest-energy quasiparticle and exciton states in two-dimensional hexagonal GaN sheets. These sheets have been proposed as parent materials for single-walled GaN nanotubes which may be of interest for optoelectronics.

Sohrab Ismail-Beigi

2006-03-16T23:59:59.000Z

403

Indicators: Performance Statistics  

E-Print Network (OSTI)

% Quality Inspections Completed 66% +12% 95% 86% 95% 52% 81% 51% 76% Utilities: Performance Statistics of performance measures and specific color code target values. Trend status color indicators ­ identifies changes from the prior month: Key: - 54% Electric - 0% All Zones Combined Zone Breakdown Steam/Chilled Water 0

Webb, Peter

404

Performance relationship diagrams  

SciTech Connect

By describing a business function's cost drivers and graphically depicting the interrelated cost drivers serving as controls and resources to them, a visual performance model can be provided. A graphical technique, called performance relationship diagraming, has been devised that logically describes these cost drivers and their interrelationships. 2 figs.

Cary, M.J.

1991-11-01T23:59:59.000Z

405

Communicating Building Energy Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Communicating Building Energy Performance Communicating Building Energy Performance Speaker(s): William Bordass Date: August 26, 2008 - 12:00pm Location: 90-3075 Seminar Host/Point of Contact: Paul Mathew The heightened interest in building energy performance has exposed problems with reporting and benchmarking. Established conventions may no longer suit current needs, and new complications are emerging as national and corporate reporting (e.g. for carbon accounting and trading) begin to impact on the certification and labelling of building energy performance. If we are to achieve genuinely low-energy and carbon buildings, we need to get much better at reporting and benchmarking our intentions and outcomes, and particularly making performance visible and communicating it to all the people concerned. In design, this could help us to reduce the persistent

406

Coatings for performance retention  

Science Journals Connector (OSTI)

Performance and performance retention are becoming increasingly important in today’s gas turbine engines. The military aircraft engine operator wants the flexibility and flight envelope that increased performance will give and the commercial user—aircraft utility generation or pumper—demands the long term fuel economy that improved performance retention will provide. Materials advances have provided the intrinsic strength and temperature increases to push the capability of today’s engines and coatings have been an integral part of that advancement. Specifically in the performance retention area coatings and seal systems have become increasingly important in both compressor and turbine components. It is the intent of this overview paper to present a brief review of the coating systems presently in use and in development and to consider areas in which the technology might be heading.

R. V. Hillery

1986-01-01T23:59:59.000Z

407

Property:Wave Period Range(s) | Open Energy Information  

Open Energy Info (EERE)

Wave Period Range(s) Wave Period Range(s) Jump to: navigation, search Property Name Wave Period Range(s) Property Type String Pages using the property "Wave Period Range(s)" Showing 25 pages using this property. (previous 25) (next 25) 1 1.5-ft Wave Flume Facility + 10.0 + 10-ft Wave Flume Facility + 0.0 + 11-ft Wave Flume Facility + 10.0 + 2 2-ft Flume Facility + 10.0 + 3 3-ft Wave Flume Facility + 10.0 + 5 5-ft Wave Flume Facility + 10.0 + 6 6-ft Wave Flume Facility + 10.0 + A Alden Large Flume + 2.1 + Alden Small Flume + 0.0 + Alden Wave Basin + 1.0 + B Breakwater Research Facility + 0.0 + C Carderock Maneuvering & Seakeeping Basin + 0.0 + Carderock Tow Tank 2 + 0.0 + Carderock Tow Tank 3 + 0.0 + Chase Tow Tank + 3.1 + Coastal Harbors Modeling Facility + 2.3 +

408

Spiking mode operation for a uniform-period wiggler  

SciTech Connect

The onset of saturation in a uniform-period wiggler has been examined experimentally and through numerical simulations. Models have been constructed that explain the observations in simple and consistent ways. The models are based upon the development of strong frequency and amplitude modulation of the optical wave as a way to increase extraction efficiency and optical power.

Warren, R.W.; Goldstein, J.C.; Newnam, B.E.

1985-01-01T23:59:59.000Z

409

EFFECT OF REACTION RATE PERIODICITY ON DETONATION PROPAGATION  

E-Print Network (OSTI)

EFFECT OF REACTION RATE PERIODICITY ON DETONATION PROPAGATION Eric O. Morano and Joseph E. Shepherd through numerical simulations how the detonation propagation is affected by the heterogeneous rate but there is no accepted and accurate repre- sentation of all thermodynamic states significant to the detonation process

Barr, Al

410

Periodic orbit theory of chaotic tunneling Olivier Sigwarth  

E-Print Network (OSTI)

pre­ cisely in this organization into nearly cancelling combinations: cycle expansions are dominated Cvitanovi'c April 17, 1998 PACS: 03.20.+i, 03.65.Sq, 05.40.+j, 05.45.+b keywords: cycle expansions, periodic orbits, dynamical zeta functions, quantum tunneling. Abstract 1 cycle expansions. 1 Introduction

Cvitanovc', Predrag

411

Periodic orbit theory of linear response Niels Sndergaard  

E-Print Network (OSTI)

all distinct non- repeating combinations of prime cycles. For k > 1, tp1+p2+...+pk are weights pre- cisely in this organization into nearly cancelling combinations: cycle expansions are dominated: 03.20.+i, 03.65.Sq, 05.40.+j, 05.45.+b keywords: cycle expansions, periodic orbits, dynamical zeta

Cvitanovc', Predrag

412

Reduction of periodic one-dimensional hopping model  

E-Print Network (OSTI)

In this research, methods of reducing a general periodic one-dimensional hopping model to a one- or two-state model, which keeps the basic properties of the original process, are discussed. This reduction also implies that, to some extent, many processes can be well described by simple two-state or even one-state models.

Yunxin Zhang

2010-07-04T23:59:59.000Z

413

Recognition of resonance type in periodically forced oscillators  

E-Print Network (OSTI)

. Vegtera a Johann Bernoulli Institute for Mathematics and Computer Science, University of Groningen, P.O. Box 407, 9700 AK Groningen, The Netherlands. Abstract This paper deals with families of periodically Institute of Mathematics and Computer Science, University of Groningen, P.O. Box 407, 9700 AK, Groningen

Vegter, Gert

414

lthough Earth has undergone many periods of significant environmen-  

E-Print Network (OSTI)

A lthough Earth has undergone many periods of significant environmen- tal change, the planet push the Earth system outside the stable environmental state of the Holocene, with consequences occurred naturally and Earth's regu- latory capacity maintained the conditions that enabled human

Horton, Tom

415

L-FUNCTIONS AND PERIODS OF ADJOINT MOTIVES Michael Harris  

E-Print Network (OSTI)

L-FUNCTIONS AND PERIODS OF ADJOINT MOTIVES Michael Harris UFR de Math´ematiques Universit´e Paris 7 for unitary groups, due to Neal Harris, with Deligne's conjecture on critical values of L-functions. When for inclusions of special orthogonal groups; the version for unitary groups, due to Neal Harris [NH], gives

Harris, Michael - Institut de Mathématiques de Jussieu, Université Paris 7

416

Contract Periods for 2012-2013 Residence Halls  

E-Print Network (OSTI)

Contract Periods for 2012-2013 Residence Halls All of the residence halls are on Fall/Spring Contracts. THERE IS NO FALL ONLY CONTRACT. · The residence halls open for the fall semester on September 1 rate for the number of days they stay. Apartments Your contract entitles you to an apartment space

Minnesota, University of

417

Time period Annual mean [DOC] 95% CI (mg l-1)  

E-Print Network (OSTI)

.3 Time period Annual mean [SRP] ± 95% CI (mg l-1) SEPA EQS category mean Oct 2006 - Sept 2007* 16.8 ± 4 of different development activities. Building up a time series of DOC and soluble reactive phosphorus (SRP, SRP, total oxidised nitrogen and alkalinity. In addition, streamwater sampling has continued at five

418

Particle energization through time-periodic helical magnetic fields  

E-Print Network (OSTI)

We solve for the motion of charged particles in a helical time-periodic ABC (Arnold-Beltrami-Childress) magnetic field. The magnetic field lines of a stationary ABC field with coefficients A=B=C=1 are chaotic, and we show ...

Mitra, Dhrubaditya

419

Symmetric Multistip Methods for Periodic Initial Value Problems  

Science Journals Connector (OSTI)

......inwards. In the terminology of Stiefel & Bettis (1969), the former method is orbitally...proposed by Gautschi (1961) and Stiefel & Bettis (1969), but these require a priori...periodic" problem studied by Stiefel & Bettis (1969): z'+z = 0001 e^, z(0......

J. D. LAMBERT; I. A. WATSON

1976-10-01T23:59:59.000Z

420

The Best Damn Firewall Book Period, 2 edition  

Science Journals Connector (OSTI)

The Second Edition of the Best Damn Firewall Book Period is completely revised and updated to include all of the most recent releases from Microsoft, Cisco, Juniper Network, SonicWALL, and Check Point.Compiled from the best of the Syngress firewall ... Keywords: Security

Cherie Amon; Thomas W. Shinder; Anne Carasik-Henmi

2007-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Periodic NDE for Bridge Maintenance Ralf W. Arndt  

E-Print Network (OSTI)

Periodic NDE for Bridge Maintenance Ralf W. Arndt NRC Research Associate U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA ralf.arndt@fhwa.dot.gov Frank Jalinoos Program Manager U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA

Huston, Dryver R.

422

Some Thoughts on Stability in Nonlinear Periodic Focusing Systems  

DOE R&D Accomplishments (OSTI)

A brief discussion is given of the long-term stability of particle motions through periodic focusing structures containing lumped nonlinear elements. A method is presented whereby one can specify the nonlinear elements in such a way as to generate a variety of structures in which the motion has long-term stability.

McMillan, E. M.

1967-09-05T23:59:59.000Z

423

Multi-period design of heat exchanger networks  

Science Journals Connector (OSTI)

Heat exchanger networks are an integral part of chemical processes as they recover available heat and reduce utility consumption, thereby improving the overall economics of an industrial plant. This paper focuses on heat exchanger network design for multi-period operation wherein the operating conditions of a process may vary with time. A typical example is the hydrotreating process in petroleum refineries where the operators increase reactor temperature to compensate for catalyst deactivation. Superstructure based multi-period models for heat exchanger network design have been proposed previously employing deterministic optimisation algorithms, e.g. (Aaltola, 2002; Verheyen and Zhang, 2006). Stochastic optimisation algorithms have also been applied for the design of flexible heat exchanger networks recently (Ma et al., 2007, 2008). The present work develops an optimisation approach using simulated annealing for design of heat exchanger networks for multi-period operation. A comparison of the new optimisation approach with previous deterministic optimisation based design approaches is presented to illustrate the utilisation of simulated annealing in design of optimal heat exchanger network configurations for multi-period operation.

Muhammad Imran Ahmad; Nan Zhang; Megan Jobson; Lu Chen

2012-01-01T23:59:59.000Z

424

Devil's Staircase in Magnetoresistance of a Periodic Array of Scatterers  

E-Print Network (OSTI)

The nonlinear response to an external electric field is studied for classical non-interacting charged particles under the influence of a uniform magnetic field, a periodic potential, and an effective friction force. We find numerical and analytical evidence that the ratio of transversal to longitudinal resistance forms a Devil's staircase. The staircase is attributed to the dynamical phenomenon of mode-locking.

Jan Wiersig; Kang-Hun Ahn

2001-02-28T23:59:59.000Z

425

Eelgrass Enhancement and Restoration in the Lower Columbia River Estuary, Period of Performance: Feb 2008-Sep 2009.  

SciTech Connect

The purpose of this study was to evaluate the ability to enhance distribution of eelgrass (Zostera marina) in the Columbia River Estuary to serve as refuge and feeding habitat for juvenile salmon, Dungeness crab, and other fish and wildlife. We strongly suspected that limited eelgrass seed dispersal has resulted in the present distribution of eelgrass meadows, and that there are other suitable places for eelgrass to survive and form functional meadows. Funded as part of the Bonneville Power Administration's call for Innovative Projects, we initiated a multistage study in 2008 that combined modeling, remote sensing, and field experimentation to: (1) Spatially predict habitat quality for eelgrass; (2) Conduct experimental plantings; and (3) Evaluate restoration potential. Baseline in-situ measurements and remote satellite observations were acquired for locations in the Lower Columbia River Estuary (LCRE) to determine ambient habitat conditions. These were used to create a habitat site-selection model, using data on salinity, temperature, current velocity, light availability, wave energy, and desiccation to predict the suitability of nearshore areas for eelgrass. Based on this model and observations in the field, five sites that contained no eelgrass but appeared to have suitable environmental conditions were transplanted with eelgrass in June 2008 to test the appropriateness of these sites for eelgrass growth. We returned one year after the initial planting to monitor the success rate of the transplants. During the year after transplanting, we carried out a concurrent study on crab distribution inside and outside eelgrass meadows to study crab usage of the habitat. One year after the initial transplant, two sites, one in Baker Bay and one in Young's Bay, had good survival or expansion rates with healthy eelgrass. Two sites had poor survival rates, and one site had a total loss of the transplanted eelgrass. For submerged aquatic vegetation (SAV) restoration projects, these are reasonable success results and represent a small net gain in eelgrass in the LCRE. Crabs used both the eelgrass and unvegetated substrate, though in neither were there great abundance of the young-of-the-year crabs. During the field assessment of 12 potential transplant sites, divers discovered one site in southern Young's Bay that contained a previously undocumented eelgrass bed. This integrated project developed the first predictive maps of sites suitable for eelgrass and other SAV in the lower estuary. In addition, techniques developed for this project to assess light levels in existing and potential submerged habitats have great potential to be used in other regions for nearshore and coastal monitoring of SAV. Based on these preliminary results, we conclude that eelgrass distribution could likely be expanded in the estuary, though additional information on current eelgrass locations, usage by species of interest, and monitoring of current conditions would help develop a baseline and verify benefit. Our recommendations for future studies include: (1) Site Monitoring. Continued monitoring of restoration sites along with physical metrics of light, temperature and salinity within beds. Continued monitoring will both assist managers in understanding the longevity and expansion rate of planted sites and inform practical guidance on the minimum planted eelgrass required to develop a resilient meadow. (2) Natural bed documentation and monitoring. Document current eelgrass habitat conditions in the Columbia River by mapping eelgrass and other SAV species and monitoring physical metrics in natural beds. This will assist by better defining the factors that control the annual and spatial variation in eelgrass in the estuary, and thus lead to improved management. Improved information on conditions will help refine a habitat suitability model that can more accurately predict where eelgrass can be restored or areas under duress. (3) Monitor Species Use. Expanded monitoring of Dungeness crab and salmon use and benefit from eelgrass in the estuary to evaluate how

Judd, C.; Thom, R; Borde, A. [Pacific Northwest National Laboratory

2009-09-08T23:59:59.000Z

426

Brighter Than a Hundred Suns: Solar Power for the Southwest; Period of Performance: November 20, 2001 to October 31, 2002  

SciTech Connect

Although renewable energy development will be hindered by a persistent electric generating capacity surplus and lower power prices in the Southwest through the end of the decade, we believe that the attributes of renewable energy such as power at a guaranteed price and zero air emissions will continue to stimulate investment in new projects. With the assistance of policy initiatives that contain cost- and risk-reduction measures for investments in Concentrating Solar Power, the technology has the potential to reach cost competitiveness by the end of the decade. However, in the absence of such policy initiatives, new utility-scale solar power projects in the Southwest--or elsewhere in the country--are unlikely.

Leitner, A.; Owens, B.

2003-01-01T23:59:59.000Z

427

Environmental Management Performance Report May 2000  

SciTech Connect

The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-FU) a report of the Project Hanford Management Contractors' (PHMC)' Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, Metrics, and Cost/Schedule data contained herein is as of March 31, 2000. All other information is updated as noted.

EDER, D.M.

2000-05-01T23:59:59.000Z

428

Environmental Management Performance Report March 2000  

SciTech Connect

The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000.

EDER, D.M.

2000-03-16T23:59:59.000Z

429

3Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2006 (PDF), Facility Representative Program Performance 3Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from July to September 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. A summary of this quarters data concluded: 76% fully qualified 41% staffing level

430

2Q CY2007 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2007 (PDF), Facility Representative Program Performance 2Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2007 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2007. Data for these indicators are gathered by field elements quarterly per DOE-STD-1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to impove the FR Program. A summary of this quarter's data concluded: 74% Fully Qualified 94% Staffing Level ( last quarter was

431

4Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4Q CY2006 (PDF), Facility Representative Program Performance 4Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from October to December 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. A summary of this quarters data concluded: 72% Fully Qualified ( last Quarter was

432

2Q CY2008 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2008 (PDF), Facility Representative Program Performance 2Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2008 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2008. Data for these indicators are gathered by Field elements quarterly per DOE-STD- 1063-2006, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback to improve the FR Program. A summary of this quarter's data concluded: 87% Fully Qualifed ( last quarter was 85%) 86% Staffing Level ( last quarter was 88%)

433

ARM - 2009 Performance Metrics  

NLE Websites -- All DOE Office Websites (Extended Search)

9 Performance Metrics 9 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings User Meetings Annual Meetings of the Atmospheric System Research (ASR) Science Team and Fall Working Groups Accomplishments Read about the 20 years of accomplishments (PDF, 696KB) from the ARM Program and user facility. Performance Metrics ASR Metrics 2009 2008 2007 2006 2009 Performance Metrics Improve Climate Models - Develop a coupled climate model with fully interactive carbon and sulfur cycles, as well as dynamic vegetation to enable simulations of aerosol effects, carbon chemistry, and carbon sequestration by the land surface and oceans and the interactions between the carbon cycle and climate. In fiscal year 2009: Provide improved climate

434

Buildings Performance Metrics Terminology  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy's Commercial Building Initiative Page 1 Energy's Commercial Building Initiative Page 1 January 2009 Buildings Performance Metrics Terminology To clarify how the terms are used in the Department of Energy's Performance Metrics Research Project, a list of terms related to performance metrics are defined and include examples and comments. Visit www.commercialbuildings.energy.gov/performance_metrics.html to learn more. Baseline - a standard reference case used as a basis for comparison Examples: a simulation model of an ASHRAE 90.1 compliant building, control building, measurement of energy consumption prior to application of an energy conservation measure Comments: Establishing a clearly defined baseline very important and is often the most difficult task. Defining a repeatable baseline is essential if the work is to be compared to results of other

435

ARM - 2007 Performance Metrics  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Performance Metrics 7 Performance Metrics Science Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings User Meetings Annual Meetings of the Atmospheric System Research (ASR) Science Team and Fall Working Groups Accomplishments Read about the 20 years of accomplishments (PDF, 696KB) from the ARM Program and user facility. Performance Metrics ASR Metrics 2009 2008 2007 2006 2007 Performance Metrics A Single Column Model (SCM) represents the evolution of the atmosphere in a single grid box of a Global Climate Model (GCM). This illustration represents the observing strategy of ARM, which takes continuous atmospheric observations from fixed sites in three climate regimes around the world. A Single Column Model (SCM) represents the evolution of the atmosphere in a

436

HVAC Installed Performance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HVAC Installed Performance HVAC Installed Performance ESI, Tim Hanes Context * The building envelope has historically been the focus in residential homes. * The largest consumer of energy in residential homes is typically the HVAC system. * Testing the performance of the HVAC system has not been pursued to its full potential. Technical Approach * Currently very little performance testing is being done to the HVAC system. * The only way to know if a HVAC system is operating correctly is to measure the Btu/h. * This should be done at the equipment and at the the system. Recommended Guidance * Training of HVAC technicians, installers, and salespeople is a must. * If only the technician is trained than implementing the change will not happen. * Public awareness of proper installation and its

437

Performance and Optimization  

NLE Websites -- All DOE Office Websites (Extended Search)

Performance and Performance and Optimization Performance and Optimization Benchmarking Software on Hopper and Carver PURPOSE Test the performance impact of multithreading with representative public domain software including blastn, blastp, rpsblast, hmmsearch, usearch. Run on Hopper (24 cores/node) and Carver (8 cores/node) with different combinations of the number of tasks and threads. Provide useful set of parameters to maximize throughput PROGRAMS TESTED BLAST+ programs (blastn, blastp, rpsblast) version 2.2.26 usearch verison 5.2.32 hmmsearch version 3.0 DATASETS usearch: a collection of protein sequences (~900MB) against a reference "udb" (~900MB) blastn Query: a collection of nucleotide sequences from NCBI Microbial database from ftp://ftp.ncbi.nlm.nih.gov/refseq/release/microbial/ (34,154

438

Improving Deaerator Performance  

E-Print Network (OSTI)

The objectives of deaeration of feedwater are reviewed. A discussion of appropriate test data and methods for assessing deaerator performance are given. Analysis procedures are developed to analyze the test data. Typical problems such as over...

Dyer, D. F.; Maples, G.

439

Activity Based Performance Measurement  

E-Print Network (OSTI)

performance Potential applications · Measuring value created by new technology...or any intervention) · 2 sites recently launched (SMEs, KM) #12;RFID findings #12;© MIT Sloan School of Management 8 RFID

Brock, David

440

Performance Measurement of MEAs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

iii. Electrolyte membrane durability iv. Target cost of membrane v. Automotive fuel cell MEA degradation map 3 3 Measurement of MEA Performance 4 4 25cm 2 72mm 72mm 50mm...

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

MSC Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report AUG 2013 DOERL-2009-113 Rev 47 ii This page intentionally left blank. CONTENTS MSC Monthly...

442

Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report OCT 2013 DOERL-2009-113 Rev 49 ii This page intentionally left blank. CONTENTS MSC Monthly...

443

Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report DEC 2013 DOERL-2009-113 Rev 51 ii This page intentionally left blank. CONTENTS MSC Monthly...

444

Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report APR 2013 DOERL-2009-113 Rev 43 ii This page intentionally left blank. CONTENTS MSC Monthly...

445

Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JUN 2013 DOERL-2009-113 Rev 45 ii This page intentionally left blank. CONTENTS MSC Monthly...

446

Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report JUL 2013 DOERL-2009-113 Rev 46 ii This page intentionally left blank. CONTENTS MSC Monthly...

447

Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report MAY 2013 DOERL-2009-113 Rev 44 ii This page intentionally left blank. CONTENTS MSC Monthly...

448

Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report SEP 2013 DOERL-2009-113 Rev 48 ii This page intentionally left blank. CONTENTS MSC Monthly...

449

Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report FEB 2013 DOERL-2009-113 Rev 41 ii This page intentionally left blank. CONTENTS MSC Monthly...

450

Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

Department of Energy Contract DE-AC06-09RL14728 MSC Monthly Performance Report NOV 2013 DOERL-2009-113 Rev 50 ii This page intentionally left blank. CONTENTS MSC Monthly...

451

Profiling for Performance  

Science Journals Connector (OSTI)

Performance and profiling are critical words in our everyday conversations in the office where I work, in our engagements with clients, and in our teaching. Both words apply equally well to all aspec...

Ron Crisco

2011-01-01T23:59:59.000Z

452

Energy Performance Contracting  

Energy.gov (U.S. Department of Energy (DOE))

Provides an Energy Savings Performance Contracting (ESPC) overview and summary of ESPC resources, including training, sample documents, and guides from the U.S. Department of Housing and Urban Development. Author: U.S. Department of Housing and Urban Development

453

Energy Savings Performance Contracts  

Energy.gov (U.S. Department of Energy (DOE))

An Energy Savings Performance Contract (ESPC) is a partnership between a system owner and an Energy Services Company (ESCO). The ESCO conducts a comprehensive energy audit for the facility under...

454

MSC Monthly Performance Report  

NLE Websites -- All DOE Office Websites (Extended Search)

be completed by the end of Calendar Year 2009. EXECUTIVE OVERVIEW MSC Monthly Performance Report November 2009 DOERL-2009-113 REV 2 4 2.0 ANALYSIS OF FUNDS Table 2-1. Mission...

455

Desalination processes and performance  

SciTech Connect

Different desalination processes are evaluated for feed, capacity, performance, energy requirements, and cost. These include distillation, reverse osmosis, or electrodialysis. Detailed information is given on distillation processes and membrane processes.

Summers, L. J.

1995-06-01T23:59:59.000Z

456

Cost Optimal Energy Performance  

Science Journals Connector (OSTI)

EPBD recast requires Member States (MS) to ensure that minimum energy performance requirements of buildings are set with a view to achieving cost optimal levels using a comparative methodology framework...1]. Cost

Jarek Kurnitski

2013-01-01T23:59:59.000Z

457

Efficient optical absorption enhancement in organic solar cells by using a 2-dimensional periodic light trapping structure  

SciTech Connect

We have investigated the effects induced by periodic nanosphere arrays on the performance of organic solar cells (OSCs). Two-dimensional periodic arrays of polystyrene nanospheres were formed by using a colloidal lithography method together with plasma etching to trim down the size to various degrees on the substrates of OSCs. It is found that the devices prepared on such substrates can have improved light harvesting, resulting in as high as 35% enhancement in power conversion efficiency over that of the reference devices. The measured external quantum efficiency and finite-difference time-domain simulation reveal that the controlled periodic morphology of the substrate can efficiently increase light scattering in the device and thus enhance the absorption of incident light.

Zu, Feng-Shuo [Jiangsu Key Laboratory for Carbon-Based Functional Materials and Devices, Institute of Functional Nano and Soft Materials (FUNSOM), Collaborative Innovation Center of Suzhou Nano Science and Technology, Soochow University, Suzhou, Jiangsu 215123 (China); Center of Super-Diamond and Advanced Films (COSDAF) and Department of Physics and Materials Science, City University of Hong Kong, Hong Kong SAR (China); Shi, Xiao-Bo; Liang, Jian; Xu, Mei-Feng; Wang, Zhao-Kui, E-mail: lsliao@suda.edu.cn, E-mail: zkwang@suda.edu.cn, E-mail: apcslee@cityu.edu.hk; Liao, Liang-Sheng, E-mail: lsliao@suda.edu.cn, E-mail: zkwang@suda.edu.cn, E-mail: apcslee@cityu.edu.hk [Jiangsu Key Laboratory for Carbon-Based Functional Materials and Devices, Institute of Functional Nano and Soft Materials (FUNSOM), Collaborative Innovation Center of Suzhou Nano Science and Technology, Soochow University, Suzhou, Jiangsu 215123 (China); Lee, Chun-Sing, E-mail: lsliao@suda.edu.cn, E-mail: zkwang@suda.edu.cn, E-mail: apcslee@cityu.edu.hk [Center of Super-Diamond and Advanced Films (COSDAF) and Department of Physics and Materials Science, City University of Hong Kong, Hong Kong SAR (China)

2014-06-16T23:59:59.000Z

458

High Performance Window Attachments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

High Performance Window High Performance Window Attachments D. Charlie Curcija Lawrence Berkeley National Laboratory dccurcija@lbl.gov 510-495-2602 April 4, 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Impact of Project: * Motivate manufacturers to make improvements in Window systems U-Factors, SHGC and daylighting utilization * Increase awareness of benefits from energy efficient window attachments Problem Statement: * A wide range of residential window attachments are available, but they have widely unknown

459

Technology Performance Exchange  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Performance Exchange Technology Performance Exchange TDM - Jason Koman (BTO) TDM - Dave Catarious (FEMP) William Livingood National Renewable Energy Laboratory William.Livingood@nrel.gov 303-384-7490 April 2, 2013 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem: Perceived fiscal risk associated with the installation of unfamiliar technologies impedes adoption rates for cost-effective, energy-saving products. Impact of Project: Enable end users to quickly and

460

High Performance New Construction  

E-Print Network (OSTI)

Funding for Efficient New Buildings through Integrated Project Delivery and High Performance Design-Build Case Study Rolling Plains New Medical Office Building Michael Flores McKinstry mflores@mckinstry.com 469-789-9920 1 ESL-KT-13-12-40 CATEE..., San Antonio, Texas Dec. 16-18 Objectives • Explain how High Performance Design Build / Integrated Project Delivery (HPDB/IPD) differs from alternative project delivery methods (and why it is usually better!) • Identify the key participants in High...

Flores, M.

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Measured Performance Signature Method  

E-Print Network (OSTI)

information for adaptive on-line optimum dispatch, equipment performance monitoring, or for conducting system "what if' scenarios. The MPS is a very useful technique which may be applied to Acceptance Testing Monitoring and Operations Optimization... performance signature, may be determined from on-line measurements, and corrected to a specified reference. This procedure also provides information for adaptive on-line optimum dispatch, incremental plant heat rate data for centralized system dispatch...

Ahner, D. J.

462

Performance assurance program plan  

SciTech Connect

B and W Protec, Inc. (BWP) is responsible for implementing the Performance Assurance Program for the Project Hanford Management Contract (PHMC) in accordance with DOE Order 470.1, Safeguards and Security Program (DOE 1995a). The Performance Assurance Program applies to safeguards and security (SAS) systems and their essential components (equipment, hardware, administrative procedures, Protective Force personnel, and other personnel) in direct support of Category I and H special nuclear material (SNM) protection. Performance assurance includes several Hanford Site activities that conduct performance, acceptance, operability, effectiveness, and validation tests. These activities encompass areas of training, exercises, quality assurance, conduct of operations, total quality management, self assessment, classified matter protection and control, emergency preparedness, and corrective actions tracking and trending. The objective of the Performance Assurance Program is to capture the critical data of the tests, training, etc., in a cost-effective, manageable program that reflects the overall effectiveness of the program while minimizing operational impacts. To aid in achieving this objective, BWP will coordinate the Performance Assurance Program for Fluor Daniel Hanford, Inc. (FDH) and serve as the central point for data collection.

Rogers, B.H.

1997-11-06T23:59:59.000Z

463

Repository performance confirmation.  

SciTech Connect

Repository performance confirmation links the technical bases of repository science and societal acceptance. This paper explores the myriad aspects of what has been labeled performance confirmation in U.S. programs, which involves monitoring as a collection of distinct activities combining technical and social significance in radioactive waste management. This paper is divided into four parts: (1) A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives; (2) A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain; (3) A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant; and (4) An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. A fundamental consideration is the differentiation of confirmation monitoring from the many other testing and monitoring activities. Recently, the license application for Yucca Mountain provided a case study including a technical process for meeting regulatory requirements to confirm repository performance as well as considerations related to the preservation of retrievability. The performance confirmation plan developed as part of the Yucca Mountain license application identified a broad suite of monitoring activities. A revision of the plan was expected to winnow the number of activities down to a manageable size. As a result, an objective process for the next stage of performance confirmation planning was developed as an integral part of an overarching long-term testing and monitoring strategy. The Waste Isolation Pilot Plant compliance monitoring program at once reflects its importance to stakeholders while demonstrating adequate understanding of relevant monitoring parameters. The compliance criteria were stated by regulation and are currently monitored as part of the regulatory rule for disposal. At the outset, the screening practice and parameter selection were not predicated on a direct or indirect correlation to system performance metrics, as was the case for Yucca Mountain. Later on, correlation to performance was established, and the Waste Isolation Pilot Plant continues to monitor ten parameters originally identified in the compliance certification documentation. The monitoring program has proven to be effective for the technical intentions and societal or public assurance. The experience with performance confirmation in the license application process for Yucca Mountain helped identify an objective, quantitative methodology for this purpose. Revision of the existing plan would be based on findings of the total system performance assessment. Identification and prioritization of confirmation activities would then derive from performance metrics associated with performance assessment. Given the understanding of repository performance confirmation, as reviewed in this paper, it is evident that the performance confirmation program for the Yucca Mountain project could be readily re-engaged if licensing activities resumed.

Hansen, Francis D.

2011-09-01T23:59:59.000Z

464

High Impact Performance Incentive Grant (Florida) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impact Performance Incentive Grant (Florida) Impact Performance Incentive Grant (Florida) High Impact Performance Incentive Grant (Florida) < Back Eligibility Commercial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Grant Program Provider Enterprise Florida The High Impact Performance Incentive Grant (HIPI) is a negotiated grant used to attract and grow major high impact facilities in Florida. Grants are provided to pre-approved applicants in certain high-impact sectors such as clean energy. Projects must create at least 50 new full-time jobs in a three-year period, and make a cumulative investment in the state of at least $50 million in a three year period. The business can be granted 50%

465

2Q CY2006 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2Q CY2006 (PDF), Facility Representative Program Performance 2Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report 2Q CY2006 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative (FR) Program Performance Indicators Quarterly Report covering the period from April to June 2006. Data for these indicators are gathered by Field elements quarterly per DOE-STD-1063-2000, Facility Representatives and reported to Headquarters program offices for evaluation and feedback to improve the FR program. 2Q CY2006, Facility Representative Program Performance Indicators More Documents & Publications 3Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report 4Q CY2004 (PDF), Facility Representative Program Performance Indicators

466

3Q CY2003 (PDF), Facility Representative Program Performance Indicators  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3Q CY2003 (PDF), Facility Representative Program Performance 3Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report Attached is the Facility Representative Program Performance Indicators (PIs) Quarterly Report Covering the Period from July to September 2003. Data for these indicators are gathered by Field elements Quarterly per DOE-STD-1063-2000, Facility Representatives, and reported to Headquarters program offices for evaluation and feedback in order to improve the facility Representative Program. 3Q CY2003, Facility Representative Program Performance Indicators More Documents & Publications 2Q CY2003 (PDF), Facility Representative Program Performance Indicators Quarterly Report 3Q CY2005 (PDF), Facility Representative Program Performance Indicators

467

Tracking performance characterization and improvement of a piezoactuated micropositioning system based on an empirical index  

Science Journals Connector (OSTI)

Motion tracking is an important problem in micropositioning systems dedicated to ultra-precision robotic micromanipulation. This paper investigates the periodic motion tracking performance of a micropositioning system based on an empirical tracking performance ... Keywords: Micromanipulator, Motion control, Performance characterization, Piezoelectric actuation, Robust control, System identification

Qingsong Xu; Yangmin Li

2010-12-01T23:59:59.000Z

468

DOE Extends Public Comment Period for Uranium Program Environmental Impact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uranium Program Environmental Uranium Program Environmental Impact Statement DOE Extends Public Comment Period for Uranium Program Environmental Impact Statement April 18, 2013 - 1:08pm Addthis Contractor, Bob Darr, S.M. Stoller Corporation Public Affairs, (720) 377-9672, ULinfo@lm.doe.gov GRAND JUNCTION, Colo. - The U.S. Department of Energy (DOE) today announced that the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) has been extended to May 31, 2013. Under the Uranium Leasing Program, DOE's Office of Legacy Management manages 31 tracts of land in Mesa, Montrose, and San Miguel counties in Colorado - approximately 25,000 acres - that are leased to private entities for uranium and vanadium mining. No mining operations are active

469

On quasi-periodic solutions for a generalized Boussinesq equation  

Science Journals Connector (OSTI)

Abstract In this paper a one-dimensional generalized Boussinesq equation u t t ? u x x + ( u 3 + u x x ) x x = 0 with hinged boundary conditions is considered. It is proved that the above equation admits small-amplitude quasi-periodic solutions corresponding to finite dimensional invariant tori of an associated infinite dimensional Hamiltonian system. The proof is based on an infinite dimensional KAM theorem and the Birkhoff normal form.

Yanling Shi; Junxiang Xu; Xindong Xu

2014-01-01T23:59:59.000Z

470

Ultrasonic wave propagation in random and periodic particulate composites  

E-Print Network (OSTI)

Specimens Periodic specimens were manufactured containing multiple layers of spherical inclusions. Early attempts to make a multiple layer specimen using only polyester proved difficult and layer alignment was poor. Because of this, a PMMA matrix...), and then allowed to cool to 310 K (100' F). The finished layer consisted of a 2. 63 inrn thick circular disk of clear PMMA with an embedded layer of spheres and alignment holes near the rim. After all the layers were manufactured, they were stacked and aligned...

Henderson, Benjamin Kyle

1996-01-01T23:59:59.000Z

471

Sorting by Periodic Potential Energy Landscapes: Optical Fractionation  

E-Print Network (OSTI)

Viscously damped objects driven through a periodically modulated potential energy landscape can become kinetically locked in to commensurate directions through the landscape, and thus can be deflected away from the driving direction. We demonstrate that the threshold for an object to become kinetically locked in to an array can depend exponentially on its size. When implemented with an array of holographic optical tweezers, this provides the basis for a continuous and continuously optimized sorting technique for mesoscopic objects called ``optical fractionation''.

Kosta Ladavac; Karen Kasza; David G. Grier

2003-10-16T23:59:59.000Z

472

Some Thoughts on Stability in Nonlinear Periodic Focusing Systems [Addendum  

DOE R&D Accomplishments (OSTI)

Addendum to September 5, 1967 report with the same title and with the abstract: A brief discussion is given of the long-term stability of particle motions through periodic focusing structures containing lumped nonlinear elements. A method is presented whereby one can specify the nonlinear elements in such a way as to generate a variety of structures in which the motion has long-term stability.

McMillan, Edwin M.

1968-03-29T23:59:59.000Z

473

Unidirectional Invisibility Induced by PT-Symmetric Periodic Structures  

SciTech Connect

Parity-time (PT) symmetric periodic structures, near the spontaneous PT-symmetry breaking point, can act as unidirectional invisible media. In this regime, the reflection from one end is diminished while it is enhanced from the other. Furthermore, the transmission coefficient and phase are indistinguishable from those expected in the absence of a grating. The phenomenon is robust even in the presence of Kerr nonlinearities, and it can also effectively suppress optical bistabilities.

Lin Zin; Ramezani, Hamidreza; Kottos, Tsampikos [Department of Physics, Wesleyan University, Middletown, Connecticut 06459 (United States); Eichelkraut, Toni; Christodoulides, Demetrios N. [College of Optics and Photonics-CREOL, University of Central Florida, Orlando, Florida 32816 (United States); Cao Hui [Department of Applied Physics, Yale University, New Haven, Connecticut 06520 (United States)

2011-05-27T23:59:59.000Z

474

Orbital periods of twenty two subdwarf B stars  

E-Print Network (OSTI)

Subdwarf B (sdB) stars are thought to be core helium burning stars with low mass hydrogen envelopes. In recent years it has become clear that many sdB stars lose their hydrogen through interaction with a binary companion and continue to reside in binary systems today. In this paper we present the results of a programme to measure orbital parameters of binary sdB stars. We determine the orbits of 22 binary sdB stars from 424 radial velocity measurements, raising the sample of sdBs with known orbital parameters to 38. We calculate lower limits for the masses of the companions of the sdB stars which, when combined with the orbital periods of the systems, allow us to discuss approximate evolutionary constraints. We find that a formation path for sdB stars consisting of mass transfer at the tip of the red giant branch followed by a common envelope phase explains most, but not all of the observed systems. It is particularly difficult to explain both long period systems and short period, massive systems. We present new measurements of the effective temperature, surface density and surface helium abundance for some of the sdB stars by fitting their blue spectra. We find that two of them (PG0839+399 and KPD1946+4340) do not lie in the Extreme Horizontal Branch (EHB) band indicating that they are post-EHB stars.

L. Morales-Rueda; P. F. L. Maxted; T. R. Marsh; R. C. North; U. Heber

2002-09-23T23:59:59.000Z

475

The shortest modulation period Blazhko RR Lyrae star: SS Cnc  

E-Print Network (OSTI)

Extended BV(RI)c CCD observations of SS Cnc, a short period RRab star are presented. Nearly 1400 data points in each band have been obtained spanning over 79 days during the spring of 2005. The star exhibits light curve modulation, the so called Blazhko effect with small amplitude (B maximum brightness varies 0.1 mag) and with the shortest modulation period (5.309 d) ever observed. In the Fourier spectrum of the V light curve the pulsation frequency components are detected up to the 24th harmonic order, and modulation side lobe frequencies with significantly asymmetric amplitudes are seen up to the 15th and 9th orders for the lower and higher frequency components, respectively. Detailed comparison of the modulation behavior of SS Cnc and RR Gem, the two recently discovered small amplitude, short modulation period Blazhko stars is presented. The modulation frequency (f_m) appears in the Fourier spectrum of both stars with similar amplitude. We also demonstrate that the modulation frequencies have basically different properties as the pulsation and modulation side lobe frequencies have, indicating that the physics behind these frequency components are not the same. The discovery of small amplitude modulations of RRab stars cautions that the large photometric surveys (MACHO, OGLE) may seriously underestimate the number of modulated RR Lyrae stars.

J. Jurcsik; B. Szeidl; Á. Sódor; I. Dékány; Zs. Hurta; K. Posztobányi; K. Vida; M. Váradi; A. Szing

2006-03-20T23:59:59.000Z

476

Many-body energy localization transition in periodically driven systems  

SciTech Connect

According to the second law of thermodynamics the total entropy of a system is increased during almost any dynamical process. The positivity of the specific heat implies that the entropy increase is associated with heating. This is generally true both at the single particle level, like in the Fermi acceleration mechanism of charged particles reflected by magnetic mirrors, and for complex systems in everyday devices. Notable exceptions are known in noninteracting systems of particles moving in periodic potentials. Here the phenomenon of dynamical localization can prevent heating beyond certain threshold. The dynamical localization is known to occur both at classical (Fermi–Ulam model) and at quantum levels (kicked rotor). However, it was believed that driven ergodic systems will always heat without bound. Here, on the contrary, we report strong evidence of dynamical localization transition in both classical and quantum periodically driven ergodic systems in the thermodynamic limit. This phenomenon is reminiscent of many-body localization in energy space. -- Highlights: •A dynamical localization transition in periodically driven ergodic systems is found. •This phenomenon is reminiscent of many-body localization in energy space. •Our results are valid for classical and quantum systems in the thermodynamic limit. •At critical frequency, the short time expansion for the evolution operator breaks down. •The transition is associated to a divergent time scale.

D’Alessio, Luca, E-mail: dalessio@buphy.bu.edu [Physics Department, Boston University, Boston, MA 02215 (United States) [Physics Department, Boston University, Boston, MA 02215 (United States); Kavli Institute for Theoretical Physics, University of California, Santa Barbara, CA 93106 (United States); Polkovnikov, Anatoli, E-mail: asp@bu.edu [Physics Department, Boston University, Boston, MA 02215 (United States)] [Physics Department, Boston University, Boston, MA 02215 (United States)

2013-06-15T23:59:59.000Z

477

Complexity of hierarchically and 1-dimensional periodically specified problems  

SciTech Connect

We study the complexity of various combinatorial and satisfiability problems when instances are specified using one of the following specifications: (1) the 1-dimensional finite periodic narrow specifications of Wanke and Ford et al. (2) the 1-dimensional finite periodic narrow specifications with explicit boundary conditions of Gale (3) the 2-way infinite1-dimensional narrow periodic specifications of Orlin et al. and (4) the hierarchical specifications of Lengauer et al. we obtain three general types of results. First, we prove that there is a polynomial time algorithm that given a 1-FPN- or 1-FPN(BC)specification of a graph (or a C N F formula) constructs a level-restricted L-specification of an isomorphic graph (or formula). This theorem along with the hardness results proved here provides alternative and unified proofs of many hardness results proved in the past either by Lengauer and Wagner or by Orlin. Second, we study the complexity of generalized CNF satisfiability problems of Schaefer. Assuming P {ne} PSPACE, we characterize completely the polynomial time solvability of these problems, when instances are specified as in (1), (2),(3) or (4). As applications of our first two types of results, we obtain a number of new PSPACE-hardness and polynomial time algorithms for problems specified as in (1), (2), (3) or(4). Many of our results also hold for O(log N) bandwidth bounded planar instances.

Marathe, M.V.; Hunt, H.B. III; Stearns, R.E.; Radhakrishnan, V.

1995-08-23T23:59:59.000Z

478

FY 2009 Annual Performance Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AnnuAl PerformAnce rePort Working to Save the Planet DOE/CF-0044 CONTENTS Introduction ....................................................................................................................................1 Mission ...........................................................................................................................................2 Message from the Secretary ...........................................................................................................3 Performance Background...............................................................................................................5 High Priority Performance Goals ...................................................................................................7

479

MICHALE SEAN FEE Curriculum Vitae  

E-Print Network (OSTI)

;Packer, Adam, 2006 Repak, Emilianne, fall 2006 to spring 2007 Ichinco, Denise, fall 2007 Lubell, Eric

Fee, Michale S.

480

Context for performance assessment  

SciTech Connect

In developing its recommendations on performance assessment for disposal of low-level radioactive waste, Scientific committee 87-3 of the National Council on Radiation Protection and Measurements (NCRP) has considered a number of topics that provide a context for the development of suitable approaches to performance assessment. This paper summarizes the Committee` discussions on these topics, including (1) the definition of low-level waste and its sources and properties, as they affect the variety of wastes that must be considered, (2) fundamental objectives and principles of radioactive waste disposal and their application to low-level waste, (3) current performance objectives for low-level waste disposal in the US, with particular emphasis on such unresolved issues of importance to performance assessment as the time frame for compliance, requirements for protection of groundwater and surface water, inclusion of doses from radon, demonstrating compliance with fixed performance objectives using highly uncertain model projections, and application of the principle that releases to the environment should be maintained as low as reasonably achievable (ALARA), (4) the role of active and passive institutional controls over disposal sites, (5) the role of the inadvertent human intruder in low-level waste disposal, (6) model validation and confidence in model outcomes, and (7) the concept of reasonable assurance of compliance.

Kocher, D.C.

1997-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "fee performance period" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Thermoelectrics Partnership: High Performance Thermoelectric...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

High Performance Thermoelectric Waste Heat Recovery System Based on Zintl Phase Materials with Embedded Nanoparticles Thermoelectrics Partnership: High Performance Thermoelectric...

482

Accomplishments in Field Period Assembly for NCSX* This is how we did it  

SciTech Connect

The National Compact Stellarator Experiment (NCSX) was a collaborative effort between ORNL and PPPL. PPPL provided the assembly techniques with guidance from ORNL to meet design criteria. The individual vacuum vessel segments, modular coils, trim coils, and toroidal field coils components were delivered to the Field Period Assembly (FPA) crew who then would complete the component assemblies and then assemble the final three field period assemblies, each consisting of two sets of three modular coils assembled over a 120o vacuum vessel segment with the trim coils and toroidal field coils providing the outer layer. The requirements for positioning the modular coils were found to be most demanding. The assembly tolerances required for accurate positioning of the field coil windings in order to generate sufficiently accurate magnetic fields strained state of the art techniques in metrology and alignment and required constant monitoring of assembly steps with laser trackers, measurement arms, and photogrammetry. The FPA activities were being performed concurrently while engineering challenges were being resolved. For example, it was determined that high friction electrically isolated shims were needed between the modular coil interface joints and low distortion welding was required in the nose region of those joints. This took months of analysis and development yet the assembly was not significantly impacted because other assembly tasks could be performed in parallel with ongoing assembly tasks as well as tasks such as advance tooling setup preparation for the eventual welding tasks. The crew technicians developed unique, accurate time saving techniques and tooling which provided significant cost and schedule savings. Project management displayed extraordinary foresight and every opportunity to gain advanced knowledge and develop techniques was taken advantage of. Despite many risk concerns, the cost and schedule performance index was maintained nearly 1.0 during the assembly phase until project cancellation. In this paper, the assembly logic, the engineering challenges, solutions to those challenges and some of the unique and clever assembly techniques, will be presented.

Michael Viola, J. Edwards, T. Brown, L. Dudek, R. Ellis, P. Heitzenroeder, R. Strykowsky and Michael Cole

2009-09-14T23:59:59.000Z

483

A Guide to Performance Contracting with ESCOs  

SciTech Connect

An energy services company (ESCO) can identify energy improvements, provide the capital required and installs improvements, offers turn-key installation services, and guarantees energy savings. Companies pay the ESCO back over a period of years from the energy cost savings generated from the project. Hiring an ESCO is a proven strategy for identifying and implementing energy saving capital improvements, while managing risks inherent in such projects. ESCOs can provide a range of services, from an energy audit to a third-party financed turn-key project with a comprehensive set of measures and guaranteed energy savings. Their specialty is the performance contract that shifts some of the project's performance risk to the ESCO in exchange for allowing the ESCO to capture a share of the savings. Key benefits to working with ESCOs include improved building performance, options for project financing and risk management, and access to expertise, new equipment and training with little to no upfront cost. Performance contracts can apply to an individual building, campuses, or whole portfolios. This guide describes the benefits offered by ESCOs and the things to consider when selecting and contracting with your provider. ESCOs have long served government markets. Performance contracting can be an effective investment approach for the private sector as well.

Baechler, Michael C.

2011-09-01T23:59:59.000Z

484

Environmental Management Performance Report June 2000  

SciTech Connect

The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.

EDER, D.M.

2000-06-01T23:59:59.000Z

485

Environmental Management Performance Report September 2000  

SciTech Connect

The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of July 31, 2000. All other information is updated as of August 24, unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular area. Green boxes denote on schedule. Yellows denote behind schedule but recoverable. Red is either missed or unrecoverable.

EDER, D.M.

2000-09-01T23:59:59.000Z

486

Performance profiles style sheet  

Gasoline and Diesel Fuel Update (EIA)

Performance Profiles of Major Energy Producers 2009 Performance Profiles of Major Energy Producers 2009 vii Major Findings This edition of Performance Profiles reviews financial and operating data for the calendar year 2009 and discusses important trends and emerging issues relevant to U.S. energy company operations. Major U.S.-based oil and natural gas producers and petroleum refiners submit the data in this report annually on Form EIA-28, the Financial Reporting System (FRS). FRS companies' net income declined to the lowest level since 2002.  Net income fell 66 percent (in constant 2009 dollars) to $30 billion in 2009 from $88 billion in 2008. Substantial reductions in oil and natural gas prices in 2009 slowed revenue growth. FRS companies cut operating costs but by less than the decline in revenue, resulting in a 69-percent drop in operating income.

487

PERFORMANCE GUARANTEE AGREEMENT  

National Nuclear Security Administration (NNSA)

F F PERFORMANCE GUARANTEE SEE ATTACHED Appendix F - Page 308 PERFORMANCE GUARANTEE AGREEMENT For value received, and in consideration of, and in order to induce the United States (the Government) to enter into Contract DE-AC52-07NA27344 for the management and operation of the Lawrence Livermore National Laboratory (the "Contract") dated __________, by and between the Government and Lawrence Livermore National Security LLC (Contractor), the undersigned, Bechtel National, Inc. (Guarantor), a corporation incorporated in the State of Nevada with its principal place of business at 5275 Westview Drive, Frederick, Maryland 21703, hereby unconditionally guarantees to the Government (a) the full and prompt payment and performance of all obligations, accrued and executory, which Contractor presently or hereafter

488

Contractor Past Performance Information  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 2010) December 2010) 1 Contractor Performance Information References Federal Acquisition Regulation (FAR) Subparts 8.4 Federal Supply Schedules - 8.406-7 Contractor performance evaluation and 8.406-8 Reporting 9.1 Responsible Prospective Contractors - 9.104 Standards and 9.105 Procedures 9.4 Debarment, Suspension and Ineligibility - 9.406 Debarment and 9.407 Suspension 12.2 Special Requirements for the Acquisition of Commercial Items - 12.206 Use of past performance 12.4 Unique Requirements Regarding Terms and Conditions for Commercial Items - 12.403 Termination 13.1 Procedures - 13.106-2 Evaluation of quotations or offers 15.3 Source Selection - 15.305 Proposal evaluation 15.4 Contract Pricing - 15.407-1 Defective cost or pricing data

489

High Performance Windows Volume Purchase: About the High Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

High Performance Windows Volume Purchase: About the High Performance Windows Volume Purchase: About the High Performance Windows Volume Purchase Program to someone by E-mail Share High Performance Windows Volume Purchase: About the High Performance Windows Volume Purchase Program on Facebook Tweet about High Performance Windows Volume Purchase: About the High Performance Windows Volume Purchase Program on Twitter Bookmark High Performance Windows Volume Purchase: About the High Performance Windows Volume Purchase Program on Google Bookmark High Performance Windows Volume Purchase: About the High Performance Windows Volume Purchase Program on Delicious Rank High Performance Windows Volume Purchase: About the High Performance Windows Volume Purchase Program on Digg Find More places to share High Performance Windows Volume Purchase:

490

Performance of Civil Aviation Receivers during Maximum Solar Activity Events  

E-Print Network (OSTI)

Performance of Civil Aviation Receivers during Maximum Solar Activity Events Lina DEAMBROGIO on the fields of ionosphere scintillations, solar energetic particles and on the implementation of operational the upcoming period of high solar activity. Emilien ROBERT got his PhD in 2005 and started to work on behalf

Boyer, Edmond

491

Impact of Lossy Links on Performance of Multihop Wireless Networks  

E-Print Network (OSTI)

great progress. Singh et al. [16] propose several routing metrics and study their performance through sensors periodically report weather information. There is previous work, such as [5] and [6], that pro- pose heuristic link metrics to attempt to accommodate loss. However, in the previous work to optimize

Holte, Robert

492

PERFORMANCE STATISTICS WEIGHTS  

NLE Websites -- All DOE Office Websites (Extended Search)

90 lbs 90 lbs Delivered Curb Weight: 2936 lbs Distribution F/R: 59/41 % GVWR: 3795 lbs GAWR F/R: 2335/2250 lbs Payload: 905 lbs Performance Goal: 400 lbs DIMENSIONS Wheelbase: 106 inches Track F/R: 59/58 inches Length: 175 inches Width: 67 inches Height: 57.8 inches Ground Clearance: 4.3 inches Performance Goal: 5.0 inches TIRES Tire Mfg: Goodyear Tire Model: Integrity Tire Size: P185/65R15 Tire Pressure F/R: 35/33 psi

493

PERFORMANCE STATISTICS WEIGHTS  

NLE Websites -- All DOE Office Websites (Extended Search)

40 lbs 40 lbs Delivered Curb Weight: 3556 lbs Distribution F/R: 58/42 % GVWR: 4665 lbs GAWR F/R: Unavailable Payload: 1109 lbs Performance Goal: 400 lbs DIMENSIONS Wheelbase: 109.3 in Track F/R: 62.0/61.6 in Length: 189.2 in Width: 71.7 in Height: 57.9 in Ground Clearance: 5.9 in Performance Goal: 5.0 in TIRES Tire Mfg: Michellin Tire Model: Energy MXV458 Tire Size: P215/60R16 Tire Pressure F/R: 32/32

494

PERFORMANCE STATISTICS WEIGHTS  

NLE Websites -- All DOE Office Websites (Extended Search)

5650 lbs 5650 lbs Delivered Curb Weight: 5579 lbs Distribution F/R: 51.8/48.2 GVWR: 7100 lbs GAWR F/R: 3200/4100 lbs Payload: 1521 lbs Performance Goal: 400 lbs DIMENSIONS Wheelbase: 116.0 in Track F/R: 68.2/67.0 in Length: 202.0 in Width: 79.0 in Height: 74.6 in Ground Clearance: 9.5 in Performance Goal: 5.0 in TIRES Tire Mfg: Bridgestone Tire Model: Dueler H/R Tire Size: P265/65R18 Tire Pressure F/R: 32 psi

495

PERFORMANCE STATISTICS WEIGHTS  

NLE Websites -- All DOE Office Websites (Extended Search)

27 lbs 27 lbs Delivered Curb Weight: 3618 lbs Distribution F/R: 58/42 % GVWR: 4680 lbs GAWR F/R: 2440/2440 lbs Payload: 1062 lbs Performance Goal: 400 lbs DIMENSIONS Wheelbase: 103.2 inches Track F/R: 61.1/60.2 inches Length: 174.5 inches Width: 71.4 inches Height: 69.5 inches Ground Clearance: 7.8 inches Performance Goal: 5.0 inches TIRES Tire Mfg: Continental Tire Model: EcoPlus Tire Size: P235/70R16

496

PERFORMANCE STATISTICS WEIGHTS  

NLE Websites -- All DOE Office Websites (Extended Search)

3474 lbs 3474 lbs Delivered Curb Weight: 3435 lbs GVWR: 4718 lbs GAWR F/R: 2491/2436 lbs Distribution F/R: % Payload: 1283 lbs Performance Goal: 400 lbs DIMENSIONS Wheelbase: 106.6 in Track F/R: 61.0/61.0 in Length: 181.3 in Width: 71.6 in Height: 65.3 in Ground Clearance: 7.0 in Performance Goal: 5.0 in TIRES Tire Mfg: General Tire Model: Ameri GS60 Tire Size: P215/70R16 Tire Pressure F/R: 35/35 psi

497

Effect of carbohydrate and carbohydrate-protein supplementation on power performance in collegiate football players performing a simulated game task  

E-Print Network (OSTI)

asked to perform a series of maximal-effort weighted sled-pushes, which simulated a game-type activity over two halves of a football game separated by a 20-minute simulated halftime recovery period. Maximal muscle power was assessed through the use of a...

Crawford, Glenda Elane

2007-04-25T23:59:59.000Z

498

NABERS: Lessons from 12 Years of Performance Based Ratings in Australia  

E-Print Network (OSTI)

The National Australian Built Environment Rating System (NABERS) has been operating for 12 years as a performance based rating system for the energy/greenhouse efficiency of office buildings in Australia. During this period, the scheme has been...

Bannister, P.

2012-01-01T23:59:59.000Z

499

Getting a Better Performing Building: Commissioning and Real Time Data Analysis  

E-Print Network (OSTI)

based on real time system operational data. Because of the dynamic nature and complexity of commercial building HVAC systems, they are the perfect target for periodic performance assessments, or recommissioning. Today's buildings are expected to supply...

Barba, M.

2002-01-01T23:59:59.000Z

500

CEPC design performance considerations  

E-Print Network (OSTI)

In this paper I will commend on the early CEPC design as of October 2014. In particular I will comment on the choice of circumference, minimum and maximum energy, number of collision points and target luminosity. I will finish with suggestions to increase performance with minimum incremental cost.

Koratzinos, M

2015-01-01T23:59:59.000Z