Powered by Deep Web Technologies
Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

fees  

Broader source: Energy.gov (indexed) [DOE]

PRIME CONTRACTOR FEES ON PRIME CONTRACTOR FEES ON SUBCONTRACTOR COSTS U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES AUDIT REPORT DOE/IG-0427 SEPTEMBER 1998 September 11, 1998 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Acting Inspector General SUBJECT: INFORMATION : Audit Report on "The U.S. Department of Energy's Prime Contractor Fees on Subcontractor Costs" BACKGROUND In Fiscal Year 1996, the Department's prime contractors awarded $5.3 billion in subcontracts. The purpose of this audit was to determine if the Department adjusted the fee bases of prime contractors to reflect the actual effort necessary to manage the technical and administrative activities of their subcontractors.

2

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Period: Fee Information Maximum Fee Contract Type: Minimum Fee 91,085,394 74,386,573 Target Fee September 2002 - March 2017 Cost Plus Fixed FeeIncentive Fee 1,192,114,896...

3

FOIA FEES  

Broader source: Energy.gov (indexed) [DOE]

Fees Fees The FOIA generally requires that requestors pay fees for processing their requests. If costs associated with the processing of a FOIA request are $15.00 or less, no fees are charged. Each FOIA request is reviewed for the purpose of placing a requestor in one of four fee categories described below: 1. Commercial use requestor: Responsible for all direct costs; i.e. search for responsive documents, review of documents located for responsiveness; 16% administrative costs; reproduction cost of $.05 per page; and the time it took the FOIA Contact Person to process the request. 2. Requestors who are representative of the news media: Responsible for reproduction costs after the first 100 pages. 3. Educational and non-commercial scientific institution requestors:

4

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

FY2010 FY2011 FY2012 Fee Information Minimum Fee Maximum Fee June 2014 Contract Number: Cost Plus Incentive Fee Contractor: 3,245,814,927 Contract Period: EM Contractor Fee Site:...

5

Student Health Service Fee Student Center Fee  

E-Print Network [OSTI]

Student Health Service Fee Student Center Fee Graduate Recreation Fee Registration Fee International Student Service Fee Level Masters Doctorial Graduate Fall 2014/Spring 2015 (Amounts reflect the amount charged per semester) GR Full-Time (Registered 9 Credits/Semester or Contracted Student) GR Part

Firestone, Jeremy

6

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

- Oak Ridge, TN Contract Name: Transuranic Waste Processing Contract June, 2014 2,433,940 Cost Plus Award Fee 150,664,017 Fee Information Minimum Fee 2,039,246 Maximum Fee...

7

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Number: Contract Type: Contract Period: 0 Minimum Fee Maximum Fee Washington River Protection Solutions LLC DE-AC27-08RV14800 Cost Plus Award Fee 5,553,789,617 Fee Information...

8

Performance Period Total Fee Paid  

Broader source: Energy.gov (indexed) [DOE]

Period Period Total Fee Paid 4/29/2012 - 9/30/2012 $418,348 10/1/2012 - 9/30/2013 $0 10/1/2013 - 9/30/2014 $0 10/1/2014 - 9/30/2015 $0 10/1/2015 - 9/30/2016 $0 Cumulative Fee Paid $418,348 Contract Type: Cost Plus Award Fee Contract Period: $116,769,139 November 2011 - September 2016 $475,395 $0 Fee Information Total Estimated Contract Cost $1,141,623 $1,140,948 $1,140,948 $5,039,862 $1,140,948 Maximum Fee $5,039,862 Minimum Fee Fee Available Portage, Inc. DE-DT0002936 EM Contractor Fee Site: MOAB Uranium Mill Tailings - MOAB, UT Contract Name: MOAB Uranium Mill Tailings Remedial Action Contract September 2013 Contractor: Contract Number:

9

New Student Orientation Student Health Service Fee  

E-Print Network [OSTI]

New Student Orientation Fee Student Health Service Fee Student Center Fee Student Comprehensive Fee Registration Fee International Student Service Fee Fall 2014 Spring 2015 $516 $599 Student Teaching Fee Lab Fee Descriptions This is a one-time fee charged to all new undergraduate students in order to support

Firestone, Jeremy

10

Total Estimated Contract Cost:) Performance Period Total Fee...  

Office of Environmental Management (EM)

Washington Closure LLC DE-AC06-05RL14655 Contractor: Contract Number: Contract Type: Cost Plus Incentive Fee 2,251,328,348 Fee Information 0 Maximum Fee 337,699,252...

11

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

0 Contractor: Bechtel National Inc. Contract Number: DE-AC27-01RV14136 Contract Type: Cost Plus Award Fee Maximum Fee* 595,123,540 Fee Available 102,622,325 10,714,819,974...

12

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

LLC (UCOR) DE-SC-0004645 April 29, 2011 - July 13, 2016 Contract Number: Maximum Fee Cost Plus Award Fee 16,098,142 EM Contractor Fee Site: Oak Ridge Office - Oak Ridge, TN...

13

Student services fee The student services fee is distributed  

E-Print Network [OSTI]

Student services fee The student services fee is distributed among various student programs that are listed online, along with their amounts, at onestop.umn.edu/finances/costs_and_ tuition/tuition_and_fees/student_ser- vice_fees.html). If you are enrolled for 6 or more credits, you must pay a student services fee of $368

Amin, S. Massoud

14

Student services fee The student services fee is distributed  

E-Print Network [OSTI]

Student services fee The student services fee is distributed among various student programs that are listed online, along with their amounts, at onestop.umn.edu/finances/costs_and_ tuition/tuition_and_fees/student_ser- vice_fees.html). If you are enrolled for 6 or more credits, you must pay a student services fee of $414

Amin, S. Massoud

15

Performance Period Total Fee Paid FY2008  

Office of Environmental Management (EM)

Type: Maximum Fee 3,129,570 175,160 377,516 1,439,287 Fee Available 175,160 80,871 Accelerated Remediation Company (aRc) DE-AT30-07CC60013 Contractor: Contract Number:...

16

Fee Title: Renewable Energy Fee Measure #: Measure 44  

E-Print Network [OSTI]

Fee Title: Renewable Energy Fee Measure #: Measure 44 Ballot Information Shall the undergraduates and graduate students of UCSC amend Measure 28, the Renewable Energy fee passed in Spring 2006 as follows Student Association. This measure will also allow the reserve money to be spent on energy efficiency

California at Santa Cruz, University of

17

SUMMARY OF FEE EARNED IN FY14 (2).xlsx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PERFORMANCE-BASED INCENTIVES Metric 1 MAXIMUM FEE FOR METRIC 1 - 2,644,671 Cubic Meter No. of Units Fee Earned 1.a For each cubic meter of CH waste disposed at WIPP in...

18

Contractor Fee Payments - Carlsbad Field Office | Department...  

Broader source: Energy.gov (indexed) [DOE]

Carlsbad Field Office Contractor Fee Payments - Carlsbad Field Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to...

19

Performance Period Total Fee Paid FY2001  

Broader source: Energy.gov (indexed) [DOE]

01 01 $4,547,400 FY2002 $4,871,000 FY2003 $6,177,902 FY2004 $8,743,007 FY2005 $13,134,189 FY2006 $7,489,704 FY2007 $9,090,924 FY2008 $10,045,072 FY2009 $12,504,247 FY2010 $17,590,414 FY2011 $17,558,710 FY2012 $14,528,770 Cumulative Fee Paid $126,281,339 Cost Plus Award Fee DE-AC29-01AL66444 Washington TRU Solutions LLC Contractor: Contract Number: Contract Type: $8,743,007 Contract Period: $1,813,482,000 Fee Information Maximum Fee $131,691,744 Total Estimated Contract Cost: $4,547,400 $4,871,000 $6,177,902 October 2000 - September 2012 Minimum Fee $0 Fee Available EM Contractor Fee Site: Carlsbad Field Office - Carlsbad, NM Contract Name: Waste Isolation Pilot Plant Operations March 2013 $13,196,690 $9,262,042 $10,064,940 $14,828,770 $12,348,558 $12,204,247 $17,590,414 $17,856,774

20

RL's Fiscal Year 2013 Fee Evaluation Summary  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Award Period: October 2012 through September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 21,030,647 Award Fee Earned:...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EM Contractor Fee Payments | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Contractor Fee Payments Contractor Fee Payments EM Contractor Fee Payments In the interest of furthering transparency in its government operations, the Department of Energy's Office of Environmental Management (EM) herein is releasing information relating to fee payments under its major cost-reimbursable contracts. Charts delineating fees that are paid under cost-plus-award-fee (CPAF), cost-plus-incentive-fee (CPIF), and cost-plus-fixed-fee (CPFF) contracts are listed by site location in the following hyperlinks. With CPFF contracts, the fee is negotiated and fixed at the inception of the contract. The fixed fee will not vary with the actual costs that the contractor incurs. In general, the contractor earns fee either by completing the work called for in the contract or devoting a specified

22

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Broader source: Energy.gov (indexed) [DOE]

$ 3,422,994.00 $ 3,422,994.00 FY2011 4,445,142.00 $ FY2012 $ 5,021,951.68 FY2013 $ 3,501,670.00 FY2014 $0 FY2015 $0 FY2016 $0 FY2017 $0 FY2018 $0 FY2019 $0 Cumulative Fee Paid $16,391,758 Wackenhut Services, Inc. DE-AC30-10CC60025 Contractor: Cost Plus Award Fee $989,000,000 Contract Period: Contract Type: January 2010 - December 2019 Contract Number: EM Contractor Fee Site: Savannah River Site Office - Aiken, SC Contract Name: Comprehensive Security Services September 2013 Fee Information Maximum Fee $55,541,496 $5,204,095 $3,667,493 $5,041,415 Minimum Fee 0 Fee Available $5,428,947 $6,326,114

23

FEDERAL LOAN FEES (Fees are deducted by the U.S. Department Of Education prior to disbursement)  

E-Print Network [OSTI]

Loan Fees A fee of 1.0% is fee assessed with an up-front fee rebate of 0.5%, resulting in a net fee of 0.5% deducted from the gross disbursement. The rebate remains in effect for all borrowers who make of the rebate is added back to the borrower's principal. Federal PLUS Loan Fees A fee of 4.0% is fee assessed

Fernandez, Eduardo

24

STUDENT SERVICES FEE ASSESSMENT REQUEST To elect to pay the Student Services Fee, fill out the form completely and return  

E-Print Network [OSTI]

STUDENT SERVICES FEE ASSESSMENT REQUEST DIRECTIONS To elect to pay the Student Services Fee, fill the Student Services Fee, you may elect to pay the fee to use or support the services covered by the fee. You of the Student Services Fee. If you are enrolled in the Senior Citizen Education Program, Regents' Scholarship

Amin, S. Massoud

25

WIPP Revised Fee Chart.xlsx  

Office of Environmental Management (EM)

6,008,123 6,008,123 * Final Fee Determination is pending. EM Contractor Fee Site: Carlsbad Field Office - Carlsbad, NM Contract Name: Waste Isolation Pilot Plant Operations...

26

Contractor Fee Payments- Portsmouth Paducah Project Office  

Broader source: Energy.gov [DOE]

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Portsmouth Paducah Project Office on these charts.

27

Contractor Fee Payments- Office of River Protection  

Broader source: Energy.gov [DOE]

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Office of River Protection on these charts.

28

Contractor Fee Payments- Savannah River Site Office  

Broader source: Energy.gov [DOE]

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts.

29

Contractor Fee Payments- Richland Operations Office  

Broader source: Energy.gov [DOE]

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Richland Operations Office on these charts.

30

SCHEDULE OF FEES Wet Milling  

E-Print Network [OSTI]

SCHEDULE OF FEES Wet Milling 100 g.......................$120..per sample* 1 kilogram of Illinois offers five milling procedures to determine processing characteristics of corn. Laboratory times. WET MILLING The wet milling process is used to produce starch (99.6% purity) as the primary

Illinois at Urbana-Champaign, University of

31

Contractor Fee Payments - Oak Ridge Operations | Department of...  

Office of Environmental Management (EM)

Oak Ridge Operations Contractor Fee Payments - Oak Ridge Operations See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to...

32

Alternative Fuels Data Center: Electric Vehicle (EV) Fee  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fee to someone by E-mail Fee to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Electric Vehicle (EV) Fee EV operators must pay an annual vehicle registration renewal fee of $100. This fee expires if the legislature imposes a vehicle miles traveled fee or

33

Water Pollution Fee (Michigan) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Water Pollution Fee (Michigan) Water Pollution Fee (Michigan) Water Pollution Fee (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Michigan Program Type Fees Siting and Permitting Provider Department of Environmental Quality The Groundwater Program regulates discharge to groundwater under Part 31, Water Resources Protection, of the Natural Resources and Environmental Protection Act, 1994 PA 451 and Part 22 Rules. Groundwater staff review

34

UCOR Contract & Fee Determination | Department of Energy  

Energy Savers [EERE]

Contract & Fee Determination The attached document is UCOR's conformed contract with the Oak Ridge Office of Environmental Managment. It is contract DE-SC0004645, and it includes...

35

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain...  

Office of Environmental Management (EM)

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's...

36

"MBUF Demo" "Mn Road Fee Test"  

E-Print Network [OSTI]

(40 mpg) Electric Vehicle (non-gas powered) State Tax * Federal Tax ** State Tax * Federal Tax"MBUF Demo" "Mn Road Fee Test" "IntelliDrive Connected Vehicles for Safety, Mobility and User Fee Overview Six Months In-Vehicle Data Collection Participant Recruited Equipment Deployed First Odometer

Minnesota, University of

37

WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE  

Broader source: Energy.gov (indexed) [DOE]

WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE DOE F 4220.23 (06-95) U.S. DEPARTMENT OF ENERGY 1. CONTRACTOR IDENTIFICATION 2. TYPE OF ACQUISTION ACTION (REFER TO OFPP MANUAL, FEDERAL PROCUREMENT DATA SYSTEMS - PRODUCT AND SERVICE CODES. APRIL 1980) a. Name c. Street address b. Division (If any) d. City e. State f. Zip code a. SUPPLIES & EQUIPMENT b. RESEARCH & DEVELOPMENT c. SERVICES: (1) ARCHITECT-ENGINEER: (2) MANAGEMENT SERVICES: (3) MEDICAL: (4) OTHER (e.g., SUPPORT SERVICES) 3. ACQUISITION INFORMATION a. Purchasing Offices b. Contract type d. FY c. RFP/RFQ No. e. Contract No. PROFIT/FEE OBJECTIVE COMPUTATION PROFIT/FEE CONSIDERATIONS a. MEASUREMENT BASE b. PROFIT/FEE WEIGHT RANGES (%) c. ASSIGNED

38

Water Use Fees (Wisconsin) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Water Use Fees (Wisconsin) Water Use Fees (Wisconsin) Water Use Fees (Wisconsin) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Program Info Start Date 2011 State Wisconsin Program Type Fees Provider Department of Natural Resources Annual $125 water use fees are charged by the State of Wisconsin to each property that has the capacity to withdraw 100,000 gallons per day or more

39

DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS  

E-Print Network [OSTI]

, VMT fee, data processing, fuel tax alternatives, fee collection center, customer service center 18DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS by Robert L. Bertini Kerri-based fee collection centers, including the identification of issues related to data transmission, data

Bertini, Robert L.

40

Alternative Fuels Data Center: Fleet User Fee Exemption  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fleet User Fee Fleet User Fee Exemption to someone by E-mail Share Alternative Fuels Data Center: Fleet User Fee Exemption on Facebook Tweet about Alternative Fuels Data Center: Fleet User Fee Exemption on Twitter Bookmark Alternative Fuels Data Center: Fleet User Fee Exemption on Google Bookmark Alternative Fuels Data Center: Fleet User Fee Exemption on Delicious Rank Alternative Fuels Data Center: Fleet User Fee Exemption on Digg Find More places to share Alternative Fuels Data Center: Fleet User Fee Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fleet User Fee Exemption Fleets with 10 or more vehicles located in defined areas of the state must pay an annual user fee of $20 per vehicle. Owners of electric vehicles and

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Nuclear Waste Fund fee adequacy: An assessment  

SciTech Connect (OSTI)

The purpose of this report is to present the Department of Energy`s (the Department) analysis of the adequacy of the 1.00 mill per kilowatt-hour (kWh) fee being paid by the utilities generating nuclear power for the permanent disposal of their spent nuclear fuel (SNF). In accordance with the Nuclear Waste Policy Act (NWPA), the SNF would be disposed of in a geologic repository to be developed by the Department. An annual analysis of the fee`s adequacy is required by the NWPA.

NONE

1990-11-01T23:59:59.000Z

42

Annual Emission Fees (Michigan) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Annual Emission Fees (Michigan) Annual Emission Fees (Michigan) Annual Emission Fees (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Michigan Program Type Fees Provider Department of Environmental Quality The Renewable Operating Permit (ROP) is required by Title V of the Clean Air Act Amendments of 1990. The ROP program clarifies the requirements that apply to a facility that emits air contaminants. Any facility in Michigan

43

Sacramento Ordinance to Waive Solar PV Fees  

Broader source: Energy.gov [DOE]

This is an ordinance by the city of Sacramento to suspend for the calendar years 2007-2009 all fees related to installation of photovoltaic systems on existing residences.

44

Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Fuel Inefficient Fuel Inefficient Vehicle Fee to someone by E-mail Share Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Facebook Tweet about Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Twitter Bookmark Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Google Bookmark Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Delicious Rank Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Digg Find More places to share Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fuel Inefficient Vehicle Fee New passenger vehicles meeting one of the following criteria are subject to an additional fee payable to the New Jersey Motor Vehicle Commission:

45

Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Electric Vehicle (EV) Electric Vehicle (EV) Registration Fee to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Electric Vehicle (EV) Registration Fee The annual registration fee for an EV is $25.00 unless the vehicle is more

46

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Annual Fee to someone by E-mail Annual Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) Annual Fee Owners of compressed natural gas and propane powered vehicles are required

47

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER  

Broader source: Energy.gov (indexed) [DOE]

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT This Fiscal Year 2008 Civilian Radioactive Waste Management Fee Adequacy Letter Report presents an evaluation of the adequacy of the one mill per kilowatt-hour fee paid by commercial nuclear power generators for the permanent disposal of their spent nuclear fuel by the Government. This evaluation recommends no fee change. CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT More Documents & Publications FY 2007 Fee Adequacy, Pub 2008 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear

48

Alternative Fuels Data Center: Ethanol Production Facility Fee  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Ethanol Production Ethanol Production Facility Fee to someone by E-mail Share Alternative Fuels Data Center: Ethanol Production Facility Fee on Facebook Tweet about Alternative Fuels Data Center: Ethanol Production Facility Fee on Twitter Bookmark Alternative Fuels Data Center: Ethanol Production Facility Fee on Google Bookmark Alternative Fuels Data Center: Ethanol Production Facility Fee on Delicious Rank Alternative Fuels Data Center: Ethanol Production Facility Fee on Digg Find More places to share Alternative Fuels Data Center: Ethanol Production Facility Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Production Facility Fee The cost to submit an air quality permit application for an ethanol production plant is $1,000. An annual renewal fee is also required for the

49

Water pollution Control Permit Fee Schedules (West Virginia) | Department  

Broader source: Energy.gov (indexed) [DOE]

pollution Control Permit Fee Schedules (West Virginia) pollution Control Permit Fee Schedules (West Virginia) Water pollution Control Permit Fee Schedules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Siting and Permitting Provider Department of Environmental Protection This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national

50

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy Savers [EERE]

Wastren-EnergX Mission Support LLC Contract Number: DE-CI0000004 Contract Type: Cost Plus Award Fee 128,879,762 Contract Period: December 2009 - July 2015 Fee Information...

51

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy Savers [EERE]

Cumulative Fee Paid 22,200,285 Wackenhut Services, Inc. DE-AC30-10CC60025 Contractor: Cost Plus Award Fee 989,000,000 Contract Period: Contract Type: January 2010 - December...

52

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy Savers [EERE]

& Wilcox Conversion Services, LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee EM Contractor Fee June, 2014 Site: Portsmouth Paducah Project Office...

53

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

2011 - September 2015 June 2014 Contractor: Contract Number: Contract Type: Idaho Treatment Group LLC DE-EM0001467 Cost Plus Award Fee Fee Information 419,202,975 Contract Period:...

54

FY 2007 Fee Adequacy, Pub 2008 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Fee Adequacy, Pub 2008 The purpose of this U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of...

55

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Type: Cost Plus Award Fee 4,104,318,749 28,500,000 31,597,837 0 39,171,018 32,871,600 EM Contractor Fee Site: Savannah River Site Office - Aiken, SC Contract Name:...

56

Alternative Fuels Data Center: Alternative Fuels Tax or Fee  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fuels Tax Alternative Fuels Tax or Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuels Tax or Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuels Tax or Fee A state excise tax applies to special fuels at a rate of $0.25 per gallon on a gasoline gallon equivalent basis. Special fuels include compressed

57

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Alternative Fuel Alternative Fuel Vehicle (AFV) User Fee Study to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) User Fee Study

58

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Parking Fee Exemption to someone by E-mail Parking Fee Exemption to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

59

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Fee Paid 127,390,991 Contract Number: Fee Available Contract Period: Contract Type: Cost Plus Award Fee 4,104,318,749 28,500,000 31,597,837 0 39,171,018 32,871,600 EM...

60

UCF TECHNOLOGY FEE GUIDELINES Academic Year 2013-2014  

E-Print Network [OSTI]

UCF TECHNOLOGY FEE GUIDELINES Academic Year 2013-2014 The 2007 Florida Legislature amended Florida Statutes, Section 1009.24, to establish "a technology fee of up to 5 percent of the tuition per credit hour to enhance instructional technology resources for students and faculty." UCF TECHNOLOGY FEE COMMITTEE Revenue

Foroosh, Hassan

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

DEVELOPMENT IMPACT FEE ADOPTION AND ITS EFFECTS IN TEXAS  

E-Print Network [OSTI]

The purpose of my thesis is to study what factors affect the adoption of impact fees in Texas and what effects impact fees have on city budgets. This research was done using two models. The first model looked at the adoption of impact fees...

Ambs, Jonathan G.

2010-01-20T23:59:59.000Z

62

Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Electric Vehicle (EV) Electric Vehicle (EV) Registration Fee Reduction to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

63

Management Controls over Performance Fees in the Idaho National Laboratory  

Broader source: Energy.gov (indexed) [DOE]

Management Controls over Performance Fees in the Idaho National Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 The Department of Energy (Department) did not always effectively and Fees use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures and fees for Fiscal Year (FY) 2005, which were disproportionately high for the work performed. Four of the 49 measures and fees established for FY 2006 provided the contractor the opportunity to earn $1 million under similar circumstances. Also, some of the performance measures worth $460,000, were implemented well

64

Appendix D - Federal Highway User Fees  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

D - FEDERAL HIGHWAY USER FEES D - FEDERAL HIGHWAY USER FEES FEDERAL HIGHWAY-USER FEES 1/ OCTOBER 2001 TABLE FE-21B USER FEE TAX RATE DISTRIBUTION OF TAX EFFECTIVE DATE HIGHWAY TRUST FUND LEAKING UNDER- GROUND STORAGE TANK TRUST FUND GENERAL FUND HIGHWAY ACCOUNT MASS TRANSIT ACCOUNT Fuel Taxes (Cents per Gallon) Gasoline 18.3 01/01/96 12 2 - 4.3 18.4 10/01/97 15.44 2.86 0.1 - Diesel and Kerosene fuel 24.3 01/01/96 18 2 - 4.3 24.4 10/01/97 21.44 2.86 0.1 - Special fuels 2/ 3/ 18.3 01/01/96 12 2 - 4.3 Liquefied Petroleum Gas 13.6 10/01/97 11.47 2.13 - - Liquefied Natural Gas 11.9 10/01/97 10.04 1.86 - - Other Special Fuels 18.4 10/01/97 15.44 2.86 0.1 - Neat alcohol (85% alcohol) 3/ 4/ 9.25 10/01/97 7.72 1.43 0.1 - Compressed natural gas 5/ 4.3 10/01/93 - - - 4.3

65

Special Fees Help Document Updated 8/23/12 Page 1 of 9  

E-Print Network [OSTI]

Special Fees Help Document ­ Updated 8/23/12 Page 1 of 9 Special Fees Request Form Help Document Affairs ­ Special Fee Forms section, select add new. #12;Special Fees Help Document ­ Updated 8/23/12 Page. Click Next to continue. #12;Special Fees Help Document ­ Updated 8/23/12 Page 3 of 9 Complete the course

Farritor, Shane

66

City of Asheville - Building Permit Fee Waiver | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 7/01/2009 State North Carolina Program Type Green Building Incentive Provider Building Safety Department The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings. Waivers for building permit fees may apply to residences with the following designations (the regular fee is in parentheses): * HealthyBuilt Home Certification* ($100) * Energy Star Rating ($100) * Geothermal heat pumps ($50)

67

Privacy Act Fees and Time Limits | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Fees and Time Limits | National Nuclear Security Administration Fees and Time Limits | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Privacy Act Fees and Time Limits Home > About Us > Our Operations > NNSA Office of General Counsel > Privacy Act (PA) of 1974 > Privacy Act Fees and Time Limits Privacy Act Fees and Time Limits The Act provides agencies to assess fees only for the cost of reproducing

68

Federal Court Dismisses Waste Fee Challenges | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Federal Court Dismisses Waste Fee Challenges Federal Court Dismisses Waste Fee Challenges Federal Court Dismisses Waste Fee Challenges December 13, 2010 - 2:31pm Addthis The D.C. Circuit today dismissed petitions filed by the National Association of Regulatory Utility Commissioners (NARUC) and other entities seeking (1) to force the Department to issue an assessment of the adequacy of the nuclear waste fund fee and (2) compelling suspension of the fee. These petitions were filed before the Department's recent issuance of a new fee assessment, and, in that context, the court determined that the petitions were moot and unripe. The court's order can be found here. Addthis Related Articles NARUC Releases Cybersecurity Primer for Utility Regulators (June 2012) DOE Does Not Oppose Petitions to Intervene in Yucca Mountain NRC Proceeding

69

ETH-Bibliothek Fees ETH staff and doc-toral students with  

E-Print Network [OSTI]

additional: 5.­ 1-2 images: 20.­ each additional: 10.­ Publication and royalty fees Copies (PDF) per page fees and royalty fees free of charge free of charge free of charge ex publication: 20

Gilli, Adrian

70

Rules and Regulations Governing the Establishment of Various Fees (Rhode  

Broader source: Energy.gov (indexed) [DOE]

the Establishment of Various Fees the Establishment of Various Fees (Rhode Island) Rules and Regulations Governing the Establishment of Various Fees (Rhode Island) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Rhode Island Program Type Siting and Permitting Provider Department of Environmental Management These regulations describe the fees associated with several Department of Environmental Management regulatory programs, including programs pertaining

71

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

Analytical Services & Testing Contract June 2014 Contractor: Contract Number: Contract Type: Advanced Technologies & Labs International Inc. DE-AC27-10RV15051 Cost Plus Award Fee...

72

FY 13 Award Fee Determination Scorecard Contractor: Swift &...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

There were no significant deficiencies but improvements are expected in work controls and conduct of operations in fiscal year 2014. Performance Based Incentives Award Fee...

73

Microsoft Word - Award Fee Determination Scorecard for FY 2013...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(81.1%) Award Fee Area Adjectival Ratings: Functional Element Adjectival Rating* Conduct of Operations Very Good General Management Very Good -Contract Administration and...

74

Fees For Disposal Of Hazardous Waste Or Substances (Alabama)  

Broader source: Energy.gov [DOE]

The article lists annual payments to be made to counties, restrictions on disposal of hazardous waste, additional fees collected by counties and penalties.

75

Sacramento Ordinance to Waive Fees for Solar Hot Water  

Broader source: Energy.gov [DOE]

An ordinance suspending for the calendar years 2007-2009 all fees related to installations of solar water heaters on existing residences.

76

Alaska Division of Water Permit Fees | Open Energy Information  

Open Energy Info (EERE)

Web Site: Alaska Division of Water Permit Fees Author Alaska Division of Water Published Publisher Not Provided, Date Not Provided DOI Not Provided Check for DOI availability:...

77

Sandia National Laboratories: User Fees for NSTTF Capabilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Capabilities * NSTTF User Fees * Optics Lab * rotating platform * solar * Solar Energy * Solar Furnace * solar power * Solar Research * Solar Tower Comments are closed. Last...

78

A computerized student fee system for Texas A&M University  

E-Print Network [OSTI]

options 12 12 15 3. 2 Initial f e assessment 3. 3 Fee update procedures 18 3. 3. 1 Normal fee revisions 3. 3. 2 Drop/add fee revisions 3. 3. 3 Processing fee payments 4. S UMK4R Y REFERENCES 21 23 25 26 30 APPENDIX A Program Operating..., but the production of revised fee state- ments is postponed until after the twelfth class day. 3. $. 2 Dro add fee revisions. Other fee revisions are made neces- sary by the student's adding and/or dropping of courses after the original schedule and fee statement...

Wood, Lester Seth

2012-06-07T23:59:59.000Z

79

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Office of Environmental Management (EM)

DE-AM09-05SR22405DE-AT30-07CC60011SL14 Contractor: Contract Number: Contract Type: Cost Plus Award Fee 357,223 597,797 894,699 EM Contractor Fee Site: Stanford Linear...

80

Colorado School of Mines 1 Tuition, Fees, Financial  

E-Print Network [OSTI]

Colorado School of Mines 1 Tuition, Fees, Financial Assistance, Housing & Dining Rates 2014-2015 Tuition and fees are established by the Board of Trustees of Colorado School of Mines following the annual budget process and action by the Colorado General Assembly and Governor. Undergraduate Tuition

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Student Action Committee Report on the Student Comprehensive Fee  

E-Print Network [OSTI]

1 Student Action Committee Report on the Student Comprehensive Fee April, 2010 #12;2 Table:................................................................................................................15 #12;3 Executive Summary: The SGA formally adopted a definition of the Student Comprehensive Fee requiring that all sections support specific services and facilities accessible to all current students

Hayden, Nancy J.

82

Air Pollution Control Fees (Ohio) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Air Pollution Control Fees (Ohio) Air Pollution Control Fees (Ohio) Air Pollution Control Fees (Ohio) < Back Eligibility Utility Agricultural Investor-Owned Utility State/Provincial Govt Construction Municipal/Public Utility Local Government Rural Electric Cooperative Program Info State Ohio Program Type Environmental Regulations Fees Provider Ohio Environmental Protection Agency Facilities with a potential to emit any one regulated air pollutant of a quantity greater than or equal to 100 tons per year, or any one hazardous air pollutant (HAP) greater than or equal to 10 tons per year, or any combination of hazardous air pollutants greater than 25 tons per year, must submit, in a form and manner prescribed by the director, a fee emission report that quantifies the actual emission data for particulate matter,

83

PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- March 2013 Page 1 - March 2013 Page 1 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP) 1 OCTOBER 2012 through 30 SEPTEMBER 2013 Contract No. DE- EM-0001971 I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) provides a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract. Fee determinations are not subject to the Disputes Clause of the contract. II. ORGANIZATIONAL STRUCTURE AND DUTIES The following organizational structure is established for administering the fee provisions of the contract. A. Roles and Responsibilities 1. Fee Determination Official (FDO) - The Head of Contracting Activity (HCA) has appointed the CBFO Manager as the FDO. The FDO

84

Underground Injection Control Fee Schedule (West Virginia) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Injection Control Fee Schedule (West Virginia) Injection Control Fee Schedule (West Virginia) Underground Injection Control Fee Schedule (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Provider Department of Environmental Protection This rule establishes schedules of permit fees for state under-ground injection control permits issued by the Chief of the Office of Water Resources. This rule applies to any person who is required to apply for and

85

Local Option - Building Permit Fee Waivers for Renewable Energy Projects  

Broader source: Energy.gov (indexed) [DOE]

Local Option - Building Permit Fee Waivers for Renewable Energy Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government General Public/Consumer Industrial Installer/Contractor Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Connecticut Program Type Solar/Wind Permitting Standards Provider Department of Energy and Environmental Protection As of July 2011, Connecticut authorizes municipalities to pass a local

86

Cost-share Fee Waiver request form Request for a cost share for a GSSP fee waiver on the following project. Documentation from granting  

E-Print Network [OSTI]

Cost-share Fee Waiver request form Request for a cost share for a GSSP fee waiver on the following project. Documentation from granting agency with information regarding tuition as unallowable must____________________________________________________________ Project Name __________________________________________________________________ Funding Agency

Taylor, Jerry

87

City of Riverhead - Energy Conservation Device Permitting Fees | Department  

Broader source: Energy.gov (indexed) [DOE]

City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 07/01/2005 (retroactive) State New York Program Type Green Building Incentive Provider Building Department In 2006 the Town of Riverhead on Long Island enacted a special allowance in its building permit fee structure to provide a discount to people wishing to install energy conservation devices on residential or commercial buildings. The provision in the town code applies to any energy conservation device "installed in or on a structure which qualifies for any federal, state or local tax exemption, tax credit or tax rebate", but

88

Property Tax Fee-In-Lieu (Mississippi) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Property Tax Fee-In-Lieu (Mississippi) Property Tax Fee-In-Lieu (Mississippi) Property Tax Fee-In-Lieu (Mississippi) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Mississippi Program Type Property Tax Incentive Provider Mississippi Department of Revenue The Property Tax Fee-In-Lieu allows for new or expansion projects in the

89

Small Business Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) |  

Broader source: Energy.gov (indexed) [DOE]

Administration (SBA) Guarantee Fee Tax Credit Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) Small Business Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) < Back Eligibility Agricultural Commercial Construction Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Oklahoma Program Type Corporate Tax Incentive Provider Small Business Administration The Small Business Administration (SBA) Guarantee Fee Tax Credit allows for small businesses operating in Oklahoma to claim a credit against income tax liability. This credit may be claimed for tax year 2012 and subsequent tax

90

D235 (8-11) Patient Copy Fee Agreement  

E-Print Network [OSTI]

): _______________________________________________ For credit card billing: r VISA r M/C Credit card #: Expiration Date: Name on credit card: Credit card billing address: (Please note: sales tax and applicable postage will be added to total fee.) #12;

Squire, Larry R.

91

Idaho Water Right Applications, Forms, and Fees Webpage | Open...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho Water Right Applications, Forms, and Fees Webpage Abstract This webpage provides an overview...

92

Solid Waste Assessment Fee Exemptions (West Virginia) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Solid Waste Assessment Fee Exemptions (West Virginia) Solid Waste Assessment Fee Exemptions (West Virginia) Solid Waste Assessment Fee Exemptions (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Rebate Program A person who owns, operates, or leases an approved solid waste disposal facility is exempt from the payment of solid waste assessment fees, upon the receipt of a Certificate of Exemption from the director, if that

93

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

and Fee to someone by E-mail and Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) Tax and Fee Compressed natural gas (CNG) used in motor vehicles is subject to a state

94

Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of the adequacy of the fee being paid by nuclear power utilities...

95

Licensing Uncertain Patents: Per-Unit Royalty vs. Up-Front Fee  

E-Print Network [OSTI]

Licensing Uncertain Patents: Per-Unit Royalty vs. Up-Front Fee David Encaouay and Yassine Lefouiliz schemes are investigated: the per-unit royalty rate and the up-front fee. We provide conditions under-unit royalty scheme, the opportunity to do so does not exist under the up-front fee scheme. We also establish

Boyer, Edmond

96

GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions |  

Broader source: Energy.gov (indexed) [DOE]

GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions February 26, 2010 - 3:17pm Addthis Consistent with the Administration's commitment to transparency, DOE General Counsel Scott Blake Harris has decided that all future determinations as to the adequacy of the Nuclear Waste Fund fee will be made available to the public on DOE's website shortly after DOE makes a determination. The report relied upon in determining fee adequacy for 2008, the most recent year for which DOE has made a determination, is available here: (2008 Fee Adequacy Letter Report). Addthis Related Articles DOE Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee Department of Energy Files Motion to Withdraw Yucca Mountain License

97

Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Reduced Registration Reduced Registration Fee for Fuel-Efficient Vehicles to someone by E-mail Share Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Facebook Tweet about Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Twitter Bookmark Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Google Bookmark Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Delicious Rank Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Digg Find More places to share Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on AddThis.com... More in this section... Federal State Advanced Search

98

Equity Evaluation of Vehicle Miles Traveled Fees in Texas  

E-Print Network [OSTI]

to the infrastructure but the money needed to maintain and improve roadways is not being adequately generated. One proposed alternative to the gas tax is the creation of a vehicle miles traveled (VMT) fee; with equity being a crucial issue to consider. This research...

Larsen, Lisa Kay

2012-10-19T23:59:59.000Z

99

University Fees & Financial Planning for Parents and Families  

E-Print Network [OSTI]

, part-time school year, on campus work-study U of T Grants UTAPS, UTM Grant helpful hint: apply) $5,865* $5,865* Incidental Fees $1,365* $1,365* Books/School Supplies $1,000 $1,000 Rent range from approximately $9960 - $13863 (2013-14). · Bioinformatics · Commerce, Management · Computer

Sokolowski, Marla

100

Optimal investment with high-watermark performance fee Karel Janecek  

E-Print Network [OSTI]

Optimal investment with high-watermark performance fee Karel Janecek and Mihai S^irbu January 5, 2011 Abstract We consider the problem of optimal investment and consumption when the investment oppor as a geometric Brownian motion and the performance of the investment and consumption strategy is measured using

Sîrbu, Mihai

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

THE UNIVERSITY OF HONG KONG Payment of Application Fee  

E-Print Network [OSTI]

: "06" Other Fees 4) Enter Bill Account Number: For HSBC / Hang Seng Bank / JETCO: 20999999834001 5 of the following websites: HSBC hsbc.com.hk> Hang Seng Bank JETCO the account transfer function for payment) HSBC: View and Pay Bills Hang Seng Bank: View and Pay Bills JETCO

Tam, Vincent W. L.

102

Federal Register /'Vol. 51, No. 243 / Thursday, December 18, 1986 / Proposed Rules fees. Only two fee items on the 1984  

E-Print Network [OSTI]

Federal Register /'Vol. 51, No. 243 / Thursday, December 18, 1986 / Proposed Rules fees. Only two of the Secretary, Room 2215, Interstate Commerce Commission Building, Washington, DC 20423 or call (202) 275- 7428 of energy nor should it have a significant effect on a substantial number of small entities. List

103

1. Preconstruction Phase Payments Preconstruction Phase fees are negotiated as a lump sum amount, with fees being associated with individual  

E-Print Network [OSTI]

, if any), and are to be submitted to the Facilities Design and Construction Office (FDC). If any by the schedule of values. Fee and General Conditions Pay Request Documentation: a) The overhead and profit in writing from the FSU project manager. Line item amounts from the GMP for salaries shall not be exceeded

Sura, Philip

104

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition  

Broader source: Energy.gov (indexed) [DOE]

4 Fee Determinations: Requirement to Obtain 4 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Attached is Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. POLICY_FLASH_2013-24 disseminating the Dep Sec's memo of Jan 28 2013 on Fee Determ and AEs.pdf Fee Determinations - Requirement to Obtain Acquisition Executive's Input.pdf More Documents & Publications Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule

105

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition  

Broader source: Energy.gov (indexed) [DOE]

4 Fee Determinations: Requirement to Obtain 4 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Attached is Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. POLICY_FLASH_2013-24 disseminating the Dep Sec's memo of Jan 28 2013 on Fee Determ and AEs.pdf Fee Determinations - Requirement to Obtain Acquisition Executive's Input.pdf More Documents & Publications Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule

106

16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security...  

Open Energy Info (EERE)

Abstract These regulations outline the requirements for fees and financial security with the Oil and Gas Division of the Railroad Commission of Texas. Published NA...

107

Recreation Pool Hours and Availability for Rochester INDIVIDUAL GUEST FEES WILL APPLY AT FACILITIES LISTED  

E-Print Network [OSTI]

Recreation Pool Hours and Availability for Rochester INDIVIDUAL GUEST FEES WILL APPLYSp_aquatic.pdf Perinton http://www.perinton.org/Departments/Recreation/PCC Pittsford Pages 1012 http

Portman, Douglas

108

Proposals for Technology Innovation Projects Student technology fees are intended to enhance student learning and the student  

E-Print Network [OSTI]

Proposals for Technology Innovation Projects Student technology fees Technology Committee is allocating a portion of the student technology fees received technology in this context. The committee is particularly looking for projects that

Farritor, Shane

109

Per-Unit Royalty vs Fixed Fee: The Case of Weak Patents  

E-Print Network [OSTI]

Per-Unit Royalty vs Fixed Fee: The Case of Weak Patents Rabah Amiry David Encaouaz Yassine a per-unit royalty or a ...xed fee when her innovation is covered by a weak patent, i.e. a patent of competition is not speci...ed, we show that the patent holder prefers to use a per-unit royalty scheme

Paris-Sud XI, Université de

110

ABOUT CALENDAR FEES ENROLLMENT RECORDS University Home MyUCSC People Calendars A-Z Index  

E-Print Network [OSTI]

ABOUT CALENDAR FEES ENROLLMENT RECORDS University Home MyUCSC People Calendars A-Z Index OFFICE to scholars who have not completed their own search for knowledge, meaning, and understanding CALENDAR FEES ENROLLMENT RECORDS University Home MyUCSC People Calendars A-Z Index OFFICE OF THE REGISTRAR

California at Santa Cruz, University of

111

Fee Waiver and Reduction Criteria | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fee Waiver and Reduction Criteria Fee Waiver and Reduction Criteria Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Advisory Exemptions How to Submit a FOIA Request Fee Waiver and Reduction Criteria Electronic Reading Room ISC Conventional Reading Rooms Reference Links Privacy Act Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Freedom of Information Act (FOIA) Fee Waiver and Reduction Criteria Print Text Size: A A A RSS Feeds FeedbackShare Page The FOIA generally requires that requesters pay fees for processing their requests. In accordance with 5 U.S.C 552(a)(4)(A)(iv), an agency is

112

Fees and rebates on new vehicles: Impacts on fuel efficiency, carbon dioxide emissions, and consumer surplus  

Science Journals Connector (OSTI)

Several incentive systems are examined that provide rebates on vehicles with higher-than-average fuel efficiency and levy fees on vehicles with less efficiency. The rebates and fees are applied to new vehicles at the time of purchase, and the rates are set such that the total outlay for rebates equals the revenues from fees. We find that moderately-sized rebates and fees result in a substantial increase in average fuel efficiency. Most of the effect is due to manufacturers' incorporating more fuel-efficiency technologies into the vehicles that they offer, since the rebates and fees effectively lower the price to manufacturers of these technologies. Consumer surplus is found to rise, and the profits of domestic manufacturers are estimated to drop only slightly under most systems and actually to rise under one system.

Kenneth E. Train; William B. Davis; Mark D. Levine

1997-01-01T23:59:59.000Z

113

Please complete the following information, check the meeting date you plan to attend, and return, along with $15 registration fee (checks or money order only), via mail  

E-Print Network [OSTI]

, along with $15 registration fee (checks or money order only), via mail to: Brittany Dittemore Headwaters

Guiltinan, Mark

114

Data:89fee917-1129-442e-b28a-9b075660489f | Open Energy Information  

Open Energy Info (EERE)

fee917-1129-442e-b28a-9b075660489f fee917-1129-442e-b28a-9b075660489f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuming County Public Pwr Dist Effective date: 2011/12/14 End date if known: Rate name: Municipal Commercial Electric Space Heating Rate Sector: Commercial Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

115

Requirements for Using and Administering Cost-plus-award-fee Contracts:  

Broader source: Energy.gov (indexed) [DOE]

Requirements for Using and Administering Cost-plus-award-fee Contracts: Requirements for Using and Administering Cost-plus-award-fee Contracts: Pre and Post FAC 2005-37 Pre FAC 2005-37 Prior to Federal Acquisition Circular (FAC) 2005-37, which has an effective date of October 14, 2009, the Federal Acquisition Regulation (FAR) required the following in using and administering a cost-plus-award-fee contract: 1. neither a firm-fixed-price nor a fixed-priced incentive contract was appropriate; 2. the limitations on use of a cost reimbursement contract were met; 3. the supplies or services could be acquired at lower costs, and in certain instances, with improved delivery or technical performance, by relating the amount of fee to the contractor's performance; 4. it was neither feasible nor effective to use predetermined objective incentive targets for cost,

116

City of Tucson - Permit Fee Credit for Solar Energy Systems | Department of  

Broader source: Energy.gov (indexed) [DOE]

City of Tucson - Permit Fee Credit for Solar Energy Systems City of Tucson - Permit Fee Credit for Solar Energy Systems City of Tucson - Permit Fee Credit for Solar Energy Systems < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State Arizona Program Type Green Building Incentive Provider City of Tucson The City of Tucson passed Resolution No. 20193 on September 27, 2005, to encourage the installation of solar energy systems throughout the city. The resolution established a policy whereby the director of the Department of Planning and Development Services will waive the fee paid by an applicant for a permit for the installation of a qualifying solar system up to $1,000 for a single installation, or $5,000 for a subdivision or multiple project

117

Title 46 Alaska Statutes Section 03.385 Registration Fee for...  

Open Energy Info (EERE)

Registration Fee for Registration of Tanks and Tank Systems Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 46 Alaska...

118

FY 12 Award Fee Determination Scorecard Contractor: B&W Conversion...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fee The first PBI was based on the state of readiness of the Paducah and Piketon Depleted Uranium Hexafluoride (DUF 6 ) conversion plants as of September 30, 2011. BWCS met...

119

Energy performance based connection fees: A case study in New York State  

Science Journals Connector (OSTI)

Energy connection fees and rebates, based on the projected energy load or efficiency of new buildings are currently being considered as a policy option for promoting greater energy efficiency in new construction. In theory, a well designed system of connection fees and rebates could provide states and utilities with a revenue neutral means of creating direct financial incentives for the construction of more energy-efficient buildings. However, a recent case study in New York State found that, in practice, many of the most important features affecting building energy efficiency could not be easily incorporated in connection fee programmes, and that implementation of even a scaled down programme would require a level of administrative commitment and resources which would be difficult to maintain. Instead of implementing connection fee programmes, the authors recommend devoting more resources to an approach based on the combined use of building energy rating systems, enhanced codes with better enforcement, and strategically placed financial incentives and design assistance.

Robert M. Wirtshafter; Eric W. Hildebrandt

1992-01-01T23:59:59.000Z

120

ISSUES REGARDING FEE STRUCTURE FOR THREE ENVIRONMENTAL MANAGEMENT CONTRACTS, CR-B-01-01  

Broader source: Energy.gov (indexed) [DOE]

CR-B-01-01 CR-B-01-01 AUDIT REPORT ISSUES REGARDING FEE STRUCTURE FOR THREE ENVIRONMENTAL MANAGEMENT CONTRACTS MAY 2001 U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES DEPARTMENT OF ENERGY Washington, DC 20585 May 9, 2001 MEMORANDUM FOR THE DIRECTOR, OFFICE OF MANAGEMENT AND ADMINISTRATION FROM: Phillip L. Holbrook (Signed) Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Issues Regarding Fee Structure for

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

[Type text] 2012 Higher Education Units and Fees (version 1) October 2011 Page 1  

E-Print Network [OSTI]

EDUCATION UNITS AND FEES UNIT CODE UNIT TITLE CreditPts EFTSL UnitFeefor 2012/11/10CSP UnitFeeforpre- 2010CSP UnitFeeforpre- 2009CSP UnitFeeforpre- 2008CSP FullTuitionFees fornon-CSP ACH400 RESEARCHFeefor 2012/11/10CSP UnitFeeforpre- 2010CSP UnitFeeforpre- 2009CSP UnitFeeforpre- 2008CSP Full

122

Updated May 7th, 2014 Graduate May 2014 April 2015 Program Specific Tuition Fees  

E-Print Network [OSTI]

.00 $28,160.00 Executive MBA (Global Energy) $106,050.00 $106,050.00 Graduate Programs in Education Ed ­ Educational Psychology Continuing Fees on 4th year onward at anniversary $1,164.00 N/A Master of Counselling-Course Fee (For students not in MPP program) $1,615.98 $2,424.02 MSC in Sustainable Energy Development SEDV

de Leon, Alex R.

123

Updated April 22, 2013 Graduate May 2013 April 2014 Program Specific Tuition Fees  

E-Print Network [OSTI]

,880.72 $27,880.72 Executive MBA (Global Energy) $110,000.00 $110,000.00 Graduate Programs in Education Ed ­ Educational Psychology Continuing Fees on 4th year onward at anniversary $1,152.15 N/A Master of Counselling,217.50 MPP Half-Course Fee (For students not in MPP program) $1,600.00 $2,400.00 MSC in Sustainable Energy

de Leon, Alex R.

124

Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site, IG-0377  

Broader source: Energy.gov (indexed) [DOE]

IG-1 IG-1 INFORMATION: Report on "Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site" The Secretary BACKGROUND: During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department's annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth

125

Payment Of the New Mexico Environment Department- Hazardous Waste Bureau Annual Business and Generation Fees Calendar Year 2011  

SciTech Connect (OSTI)

The purpose of this letter is to transmit to the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB), the Los alamos National Laboratory (LANL) Annual Business and Generation Fees for calendar year 2011. These fees are required pursuant to the provisions of New Mexico Hazardous Waste Act, Chapter 74, Article 4, NMSA (as amended). The Laboratory's Fenton Hill Facility did not generate any hazardous waste during the entire year, and is not required to pay a fee for calendar year 2011. The enclosed fee represents the amount for a single facility owned by the Department of Energy and co-operated by the Los Alamos National Security, LLC (LANS).

Juarez, Catherine L. [Los Alamos National Laboratory

2012-08-31T23:59:59.000Z

126

Rules and Regulations Pertaining to a User Fee System for Point Source Dischargers that Discharge Pollutants into the Waters of the State (Rhode Island)  

Broader source: Energy.gov [DOE]

These regulations establish a user fee system for point source dischargers that discharge pollutants into the surface waters of the State. The funds from such fees are used by the Department of...

127

The licensing of patents in return for a fee or royalties has a key role in drug discovery.  

E-Print Network [OSTI]

The licensing of patents in return for a fee or royalties has a key role in drug discovery. Now the licensee brings out a new product, it may be unclear whether they need to pay royalty fees to the patentee patents in exchange for royalty payments; however, they disputed whether the licence of two patents

Cai, Long

128

City of Santa Monica - Building Permit Fee Waiver for Solar Projects |  

Broader source: Energy.gov (indexed) [DOE]

You are here You are here Home » City of Santa Monica - Building Permit Fee Waiver for Solar Projects City of Santa Monica - Building Permit Fee Waiver for Solar Projects < Back Eligibility Commercial Construction Installer/Contractor Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State California Program Type Green Building Incentive Provider City of Santa Monica In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff from the Solar Santa Monica office, the city released their [http://www.solarsantamonica.com/documents/PVSubmittalRequirement2010.pdf

129

Data:Fee7418c-3a41-4178-b2de-9de44c35f3f4 | Open Energy Information  

Open Energy Info (EERE)

Fee7418c-3a41-4178-b2de-9de44c35f3f4 Fee7418c-3a41-4178-b2de-9de44c35f3f4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Lyndonville, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Street Lighting (77 W LED HP without Pole) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

130

Data:03346822-fee4-4b2f-b344-72b5185c740a | Open Energy Information  

Open Energy Info (EERE)

22-fee4-4b2f-b344-72b5185c740a 22-fee4-4b2f-b344-72b5185c740a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: San Luis Valley R E C, Inc Effective date: 2013/01/01 End date if known: Rate name: Large Power Greater than 1000 kW Secondary Metered Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

131

Data:F536be86-5808-44bb-a807-381cd4901fee | Open Energy Information  

Open Energy Info (EERE)

be86-5808-44bb-a807-381cd4901fee be86-5808-44bb-a807-381cd4901fee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Chickasaw Electric Coop, Inc Effective date: 2012/06/01 End date if known: 2012/06/30 Rate name: Industrial GSA 3-Rate 54, 55,59 Sector: Industrial Description: *GSA - 3 (1001 - 5000 KW) Source or reference: http://chickasaw.coop/Rates/rates_201206.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

132

Data:A7bca1b5-83c3-47ab-839f-ee41609fbb05 | Open Energy Information  

Open Energy Info (EERE)

bca1b5-83c3-47ab-839f-ee41609fbb05 bca1b5-83c3-47ab-839f-ee41609fbb05 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 1997/02/01 End date if known: Rate name: Unmetered Decorative Outdoor Lighting Service - 9,500 Lumens Sector: Lighting Description: Source or reference: www.rivierautilities.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

133

Data:68ab6a98-327f-4864-9d4c-51fc603fee13 | Open Energy Information  

Open Energy Info (EERE)

a98-327f-4864-9d4c-51fc603fee13 a98-327f-4864-9d4c-51fc603fee13 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Power Admin Effective date: End date if known: Rate name: Wholesale Power Rate Schedule CP&L-2-B Sector: Commercial Description: Source or reference: http://199.44.84.82/files/CP&L-2-B.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

134

Office of Inspector General report on audit of Department of Energy management and operating contractor available fees  

SciTech Connect (OSTI)

The Office of Procurement and Assistance Management has proposed changes to the method used to annually calculate and negotiate ``for profit`` management and operating contractor available fees. This proposal will increase contractor fees in exchange for the contractor`s purported assumption of additional risk. In 1991, the Department, through the Accountability Rule, increased contractor fees as an incentive to improve contractor performance and accountability. Despite the lack of measurable benefits of this effort, the Department is crafting a new fee policy which will, depending upon how it is executed, increase fees above the amount provided through the Accountability Rule as an incentive to the Department`s management and operating contractors. The objective of the audit was to determine whether the Department`s proposed change to the fee structure for determining management and operating contractor fees will be cost effective. This report describes the study`s approach, its findings and recommendations, management and auditor comments, and includes appendices with further data.

NONE

1996-05-01T23:59:59.000Z

135

File:Geothermal fee schedule 08-08-10.pdf | Open Energy Information  

Open Energy Info (EERE)

fee schedule 08-08-10.pdf fee schedule 08-08-10.pdf Jump to: navigation, search File File history File usage File:Geothermal fee schedule 08-08-10.pdf Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 33 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 20:19, 16 November 2012 Thumbnail for version as of 20:19, 16 November 2012 1,650 × 1,275 (33 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:Geothermal_fee_schedule_08-08-10.pdf&oldid=537711"

136

Report on Audit of Department of Energy Management and Operating Contractor Available Fees, IG-0390  

Broader source: Energy.gov (indexed) [DOE]

AUDIT OF DEPARTMENT OF ENERGY MANAGEMENT AND OPERATING CONTRACTOR AVAILABLE FEES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative address: Department of Energy Headquarters Gopher

137

Page 1 of 2 2014-15 Postgraduate Tuition Fees for Institute of Petroleum  

E-Print Network [OSTI]

Page 1 of 2 2014-15 Postgraduate Tuition Fees for Institute of Petroleum Engineering programmes Programme title Award FT PT FT PT FT PT Petroleum Geoscience MSc / PGDip £9,720 - £11,470 - £25,920 - Petroleum Engineering MSc / PGDip £9,720 - £11,470 - £25,920 - Reservoir Evaluation & Management MSc / PGDip

Painter, Kevin

138

Page 1 of 3 2013-14 Postgraduate Tuition Fees for Institute of Petroleum  

E-Print Network [OSTI]

Page 1 of 3 2013-14 Postgraduate Tuition Fees for Institute of Petroleum Engineering programmes Overseas Home/EU Overseas Programme title Award FT PT FT PT FT PT FT PT FT PT Petroleum Geoscience MSc campus) MSc / PGDip / PGCert £4,600 - £5,430 - £12,000 - £4,520 - £23,400 - Petroleum Engineering MSc

Painter, Kevin

139

Boston University User Fee Structure for ICP-ES, ICP-MS and Laser Labs  

E-Print Network [OSTI]

Boston University User Fee Structure for ICP-ES, ICP-MS and Laser Labs The Department of Earth for digestions protocols include flux fusions, microwave digestions, and open vial digestions. Standardization come to BU and digest their samples in our labs with sufficient training. Laser-ICP-MS cost per sample

Hutyra, Lucy R.

140

Fee Name: Increase University Library Hours of Operation Measure #: Measure 42  

E-Print Network [OSTI]

a quiet, uninterrupted space for study. Greater access to the Library is a key component to the studentsFee Name: Increase University Library Hours of Operation Measure #: Measure 42 Ballot Information Shall the undergraduate and graduate students of UCSC provide funding for the University Library (Mc

California at Santa Cruz, University of

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Fee-For-Service Contracts in the Pharmaceutical Industry (Extended Abstract)  

E-Print Network [OSTI]

Fee-For-Service Contracts in the Pharmaceutical Industry (Extended Abstract) Kathleen Martino and Yao Zhao Starting from 2005, the pharmaceutical industry has experienced a drastic change in the pricing contracts between manufacturers and distributors as the industry moved from the dominating Buy

Lin, Xiaodong

142

Costs for Academic Year 2013-2014 Tennessee Resident Tuition & Fees  

E-Print Network [OSTI]

Costs for Academic Year 2013-2014 Tennessee Resident Tuition & Fees New Undergraduate $11 Information Graduates of the BS curricula offered by the college may pursue advanced graduate study or take Industrial Engineering Materials Science & Engineering Mechanical Engineering Nuclear Engineering Master

Wang, Xiaorui "Ray"

143

User fees, health staff incentives, and service utilization in Kabarole District, Uganda  

E-Print Network [OSTI]

User fees, health staff incentives, and service utilization in Kabarole District, Uganda Walter in Kabarole District, western Uganda. Methods Of the 38 government health units that had introduced user incentive plans; Cost sharing; Community health centers/utilization; Health; Health care surveys; Uganda

Scharfstein, Daniel

144

Effects of increasing filing fees for noncompetitive onshore oil and gas leases  

SciTech Connect (OSTI)

The Government Accounting Office (GAO) examined the impact of increasing the fee charged to applicants for noncompetitive onshore oil and gas leases from $25.00 to $75.00. Interior believes the increased filing fee will: (1) reduce casual speculation and multiple filings, thereby reducing fraud potential, development delays caused by assignments, and administrative burden; and (2) generate significant additional revenue. Interior's analysis is, of necessity, based largely on conjecture, but the possibility that the positive results foreseen may not materialize to the degree projected cannot be ruled out. For example, while it is likely that the $75 fee will generate additional revenue over what was obtainable under either the $10 or $25 rate, Interior's projections of at least a million filings annually and $150 million in revenues are far from certain. GAO was also unable in the time available to determine the degree to which the problems the Department desires to overcome exist, or that they will be resolved through a fee increase. Results suggest that: reducing the number of filings is not necessarily the total or only solution to reducing the administrative burden; the casual speculator is not having that great an adverse effect on development, and in fact has certain positive aspects; and the true extent of fraud in the SOG may not be as great as initially supposed. In addition, there are possible adverse effects that may not have been fully considered. For example, the increased filing fee, when coupled with the increased rental, could adversely affect industry's exploration activities, particularly that of the smaller independent. GAO suggests, now that the increase is in effect, that the Interior Department and the Congress closely watch the results, and be prepared to take remedial action if deemed necessary.

Not Available

1982-03-19T23:59:59.000Z

145

All degree seeking students enrolled in 4 or more credit hours during the fall and/or spring semester shall pay all mandatory student fees. Degree seeking students enrolled in Field Session or Summer Session shall pay the fees specified  

E-Print Network [OSTI]

and internet network access, dial-in-services, software licensing and service support, and appropriate access in the 2007-2008 year, the fee will be used to provide all CSM students with a RTD College Pass (good for all

146

The Impact of Water Use Fees on Dispatching and Water Requirements for Water-Cooled Power Plants in Texas  

Science Journals Connector (OSTI)

The Impact of Water Use Fees on Dispatching and Water Requirements for Water-Cooled Power Plants in Texas ... Fees ranging from 10 to 1000 USD per acre-foot were separately applied to water withdrawals and consumption. ... Water consumption for thermoelectricity in Texas in 2010 totaled ?0.43 million acre feet (maf; 0.53 km3), accounting for ?4% of total state water consumption. ...

Kelly T. Sanders; Michael F. Blackhurst; Carey W. King; Michael E. Webber

2014-05-15T23:59:59.000Z

147

Data:72aa8b97-f6b5-4fee-bd62-cdc29548ae0b | Open Energy Information  

Open Energy Info (EERE)

f6b5-4fee-bd62-cdc29548ae0b f6b5-4fee-bd62-cdc29548ae0b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Cashton, Wisconsin (Utility Company) Effective date: 2009/02/15 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 40 kilowatts for three or more months in a consecutive 12-month period.

148

What is greener than a VMT tax? The case for an indexed energy user fee to finance us surface transportation  

SciTech Connect (OSTI)

Highway finance in the United States is perceived by many to be in a state of crisis, primarily due to the erosion of motor fuel tax revenues due to inflation, fuel economy improvement, increased use of alternative sources of energy and diversion of revenues to other purposes. Monitoring vehicle miles of travel (VMT) and charging highway users per mile has been proposed as a replacement for the motor fuel tax. A VMT user fee, however, does not encourage energy efficiency in vehicle design, purchase and operation, as would a user fee levied on all forms of commercial energy used for transportation and indexed to the average efficiency of vehicles on the road and to inflation. An indexed roadway user toll on energy (IRoUTE) would induce two to four times as much reduction in greenhouse gas (GHG) emissions and petroleum use as a pure VMT user fee. However, it is not a substitute for pricing GHG emissions and would make only a small but useful contribution to reducing petroleum dependence. An indexed energy user fee cannot adequately address the problems of traffic congestion and heavy vehicle cost responsibility. It could, however, be a key component of a comprehensive system of financing surface transportation that would eventually also include time and place specific monitoring of VMT for congestion pricing, externality charges and heavy vehicle user fees.

Greene, David L [ORNL

2011-01-01T23:59:59.000Z

149

Off-grid electrification with solar home systems: The experience of a fee-for-service concession in South Africa  

Science Journals Connector (OSTI)

In rural areas of developing countries, electrification projects with photovoltaic systems were conceived as pilot projects with the implementation of a limited number of systems. After considerable financial support from international donors, photovoltaic systems were often quickly abandoned few years after their installation. Using micro-credit institutions in the energy sector or implementing small utilities with a fee-for-service model is now considered as two desirable options to create a dynamic self-sustained market for solar home systems. South Africa launched in 1999 an ambitious off-grid solar electrification programme with fee-for-service concessions. Operating as small-scale utilities, fee-for-service concessions have facilitated the implementation on a large scale of solar home systems and solved the issue of high up-front cost and of long-term maintenance. This paper focuses on operational and design issues linked to the implementation of fee-for-service concessions. Even in a challenging institutional context, some South African operators seem almost able to reach their break-even point. The case of one concessionaire is detailed and serves as a basis for a discussion on the benefits and difficulties linked to the fee-for-service model and on the potential for replication.

Xavier Lemaire

2011-01-01T23:59:59.000Z

150

Computer Graphic Design Fees Scholarship R E G U L A T I O N S F O R 2 0 1 5  

E-Print Network [OSTI]

Computer Graphic Design Fees Scholarship R E G U L A T I O N S F O R 2 0 1 5 BACKGROUND This Scholarship was established in 2009 by the Faculty of Computing and Mathematical Sciences. REGULATIONS 1. The Scholarship will be known as the Computer Graphic Design Fees Scholarship. 2. The Scholarship will have

Waikato, University of

151

Changing Patterns of Rangeland Use: Functional Characteristics of the Economics and Operations of Fee Hunting Enterprises in Central and South Texas  

E-Print Network [OSTI]

......................................................... 23 3 Reasons a Landowner Would Lease Land for Fee Hunting. Percent Response Data .......................................................... 24 4 Factors a Landowner May Consider When Leasing Land for Fee Hunting. Average Response Data....................................... 25 5 Characteristics of Lease Types. .............................................. 27 6 Comparison of Lease Characteristics. .................................... 27 7 Leased ?By? Characteristics...

Sultenfuss, Sherry D.

2010-07-14T23:59:59.000Z

152

ANNEX A TO APPENDIX G, Standard Remittance Advice For Payment of Fees  

U.S. Energy Information Administration (EIA) Indexed Site

Department of Energy Department of Energy Energy Information Administration Form NWPA-830G (Revised 03/12) ANNEX A TO APPENDIX G Standard Remittance Advice For Payment of Fees OMB No: 1901-0260 Expires: 3-31-2016 Burden: 5 Hours Section 1. Identification Information: Please first read the instructions on the back. Section 2. Net Electricity Generated Calculation 1.1 Purchaser Information: Item Unit 1 Unit 2 Unit 3 Station Total 1 1.11 Name:____________________________________________ 2.1 Unit ID Code: 1.12 Address:__________________________________________

153

Physics Tutoring List Names shown are either graduate students or Physics majors charging fees for their tutoring services. These  

E-Print Network [OSTI]

6/5/2014 Physics Tutoring List Names shown are either graduate students or Physics majors charging fees for their tutoring services. These persons are not sponsored by UCLA or the Physics & Astronomy Department. Tutor Name Phone E-mail Subject(s) Bauer, David 419.460.1267 dbauer88@gmail.com Physics

Durian, Douglas

154

Kelly House Apartment Community (236 Students, Co-ed by Apt. / Tier 3 Single or Double Occupancy Fee)  

E-Print Network [OSTI]

Kelly House Apartment Community (236 Students, Co-ed by Apt. / Tier 3 Single or Double Occupancy Fee) Kelly House is a four story an apartment complex for upperclassmen at the corner of St. Philip and Vanderhorst Streets. Constructed in 1995, Kelly house features a central courtyard and central laundry room

Kunkle, Tom

155

The impact of infrastructure-related taxes and fees on airline fares in the US and the European Union  

E-Print Network [OSTI]

The purpose of this thesis is to estimate the impact of infrastructure-related add-on taxes and fees on the direct cost of air travel in the United States and the European Union. Its scope includes domestic travel in the ...

Yamanaka, Shiro, 1975-

2005-01-01T23:59:59.000Z

156

Data:B52fc314-6fee-4909-a9f8-d21e624a99cc | Open Energy Information  

Open Energy Info (EERE)

fc314-6fee-4909-a9f8-d21e624a99cc fc314-6fee-4909-a9f8-d21e624a99cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2013/07/04 End date if known: 2018/06/30 Rate name: Schedule EV-U - Commercial Public Electric Vehicle Charging Service Pilot Sector: Commercial Description: APPLICABILITY: This Schedule is applicable only for DC fast charging service provided to on-road electric vehicles at Company-operated public electric vehicle charging facilities. A maximum total of twenty-five (25) DC fast charging customer accounts (i.e., 25 utility meters) across the combined service territories of Hawaiian Electric Company, Inc., Maui Electric Company, Limited, and Hawaii Electric Light Company, Inc., will be permitted under this Schedule. The Companies may submit a request to increase the permitted maximum for the review and approval of the Hawaii Public Utilities Commission. Service under this Schedule will be available through June 30, 2018.

157

Data:Fee93627-5be3-4c60-99ef-1677c10c710e | Open Energy Information  

Open Energy Info (EERE)

Fee93627-5be3-4c60-99ef-1677c10c710e Fee93627-5be3-4c60-99ef-1677c10c710e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bay City, Michigan (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: OUTDOOR LIGHTING (Mercury Vapor - 400 watts) Sector: Lighting Description: Rate with Existing Pole(Mercury Vapor - 400 watts) Source or reference: http://www.baycitymi.org/images/Department/electric/pdf/Electric%20Service%20Rate%20Schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

158

Microsoft Word - 2008 Fee Adequacy 7-30-08 green.doc  

Broader source: Energy.gov (indexed) [DOE]

RW-0593 RW-0593 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report July 2008 U.S. Department of Energy Office of Civilian Radioactive Waste Management Washington, D.C. This publication was produced by the U.S. Department of Energy Office of Civilian Radioactive Waste Management (OCRWM) For further information contact: U.S. Department of Energy Office of Civilian Radioactive Waste Management Waste Management Office, RW-9 1000 Independence Ave., S.W. Washington, DC 20585 or: U.S. Department of Energy Office of Civilian Radioactive Waste Management Office of External Affairs, RW-14 1551 Hillshire Drive Las Vegas, NV 89134 or call: Office of Civilian Radioactive Waste Management 1-800-225-6972 or visit: the OCRWM Home Page:

159

Microsoft Word - FeeAdequacyAssessmentReport-1-16-clean_FINAL_v2-cn-substantiveeditsCAFINALv1.docx  

Broader source: Energy.gov (indexed) [DOE]

Secretary of Energy Secretary of Energy Washington, DC 20565 Secretarial Detcl'lninatiou of the Adequacy of the Nuclear Waste Fund Fee Based on the attached U.S. Department of Energy Nuclear Waste Fund Fee Adequacy Report, I detenuine that neither insufficient nor excess revenues nre being collected in order to recover the costs incurred by the Federal Government that are specified in the Nuclear Waste Policy Act of 1982, as amended. Accordingly, I do not propose an adjustment to the Nuclear Waste Flmd Fee at this time. -~ rlt~V JAN 1 6 2013 Steven Chu Date Attachment This Page Intentionally Left Blank i U.S. Department of Energy Nuclear Waste Fund Fee Adequacy Assessment Report January 2013 U.S. Department of Energy Washington, D.C. This publication was produced by the U.S. Department of Energy

160

Picking up the bill - improving health-care utilisation in the Democratic Republic of Congo through user fee subsidisation: a before and after study  

Science Journals Connector (OSTI)

User fees have been shown to constitute a major barrier to the utilisation of health-care, particularly in low-income countries such as the Democratic Republic of Congo (DRC). Importantly, such barriers can le...

Rishma Maini; Rafael Van den Bergh; Johan van Griensven

2014-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

The link between past informal payments and willingness of the Hungarian population to pay formal fees for health care services: results from a contingent valuation study  

Science Journals Connector (OSTI)

We examine the willingness of health care consumers to pay formal fees for health care use and how this willingness to pay is associated with past informal payments. We use data from a survey carried out in H...

Petra Baji; Milena Pavlova; Lszl Gulcsi

2014-11-01T23:59:59.000Z

162

Data:Ac6ffe74-5764-4b48-8766-a1929fee6126 | Open Energy Information  

Open Energy Info (EERE)

ffe74-5764-4b48-8766-a1929fee6126 ffe74-5764-4b48-8766-a1929fee6126 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wyandotte Municipal Serv Comm Effective date: 2011/10/01 End date if known: Rate name: PRIMARY SERVICE RATE (LESS THAN 1000KW)(Time-Differentiated Meter) Sector: Commercial Description: To any customer desiring service for all power and lighting purposes served through a transformer of 500 kVA or more and when the customer furnishes, owns, installs, and maintains his own transformation facilities acceptable to WMS. Source or reference: http://www.wyan.org/assets/electric/Electric%20Rates%20October%202011.pdf

163

Data:0acb8b74-4485-4e48-bfd0-fee4784244df | Open Energy Information  

Open Energy Info (EERE)

acb8b74-4485-4e48-bfd0-fee4784244df acb8b74-4485-4e48-bfd0-fee4784244df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Grays Harbor Cnty Effective date: 2013/01/01 End date if known: Rate name: RESIDENTIAL Sector: Residential Description: This schedule is available in all territory served by the District, for electric service for single-family residential and associated purposes. Examples include: Permanent homes, mobile homes, recreational vehicles, residential outbuildings, residential swimming pools, water pumping (excluding non-commercial farm irrigation, and multiple residence water pumping greater than five horsepower.) and individually metered apartments or rental units including building hall lights, air conditioning, water heating, space heating and laundry facilities therein.

164

Data:2e38fe09-4eea-422f-920a-505fee2618bb | Open Energy Information  

Open Energy Info (EERE)

9-4eea-422f-920a-505fee2618bb 9-4eea-422f-920a-505fee2618bb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule ID Small Industrial Service - Demand Metered 35 to 499 kW Sector: Industrial Description: Applicability This schedule applies to: 1) commercial and industrial customers for general power use with a demand of 35 kW to 499 kW, and 2) other services where other Rate Schedules (other than Rate Schedules NM and SG) do not apply. This schedule is applicable on an annual basis only. Power Factor Charge, per kVAr $ 1.10

165

A case study of the implementation of a parking fee at R. A. Apffel Park in Galveston, Texas  

E-Print Network [OSTI]

and Atmospheric Administration 1978). Through this effort, Cape Hatteras National Seashore was established. In 1955 the National Park Service (NPS ) issued a report entitled, A Re ort on a Seashore Recreation Area Surve ~ This report inventoried the amount...A CASF. STUDY OF THE IMFLEMENTAT ION OF A PARKING FEE AT R. A. APFFEL FARY. IN GALVESTON, TEXAS A Thesis by SHERYL DRUGGAN ALBERS Su'bmitted to the Graduate College of Texas A&M University in partial fulfillment of the reouirement...

Albers, Sheryl Druggan

1982-01-01T23:59:59.000Z

166

Data:F71e16fe-e1c6-4d99-bfd2-a79d060bb1b7 | Open Energy Information  

Open Energy Info (EERE)

fe-e1c6-4d99-bfd2-a79d060bb1b7 fe-e1c6-4d99-bfd2-a79d060bb1b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (400 MV Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

167

Data:A0fee6a1-2aa1-4217-9458-cb95314b2738 | Open Energy Information  

Open Energy Info (EERE)

fee6a1-2aa1-4217-9458-cb95314b2738 fee6a1-2aa1-4217-9458-cb95314b2738 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Minnesota Power Inc Effective date: 2009/10/01 End date if known: Rate name: RIDER FOR FOND DU LAC RESERVATION BUSINESS LICENSE FEE Sector: Description: APPLICATION Applicable to billings for electric service provided within the Fond du Lac Reservation located in the southern portion of St. Louis County and the northern portion of Carlton County, Minnesota. ADJUSTMENT In accordance with the Corporate Code, Business License System and Employment Rights Law contained in the Fond du Lac Reservation Ordinance 5/84, businesses operating within the Reservation shall pay an assessment of 0.5 percent on revenues from sales within the Reservation. Therefore, there shall be added to each customer's monthly electric service bill a Fond du Lac Reservation Business License Fee assessment. The amount of the fee to be assessed shall be the applicable Assessment Rate multiplied by the Customer's bill for electric service. Compliance by Minnesota Power with the Business License System is governed by the terms of an agreement dated September 25, 1985, as amended by letter dated January 6, 1986, made with the Reservation Business Committee. Since the License Fee assessable by Minnesota Power applies retroactively to October 2, 1985, the initial Assessment Rate shall be 1.0 percent until such time as all retroactive amounts have been collected. Thereafter, the Assessment Rate shall be 0.5 percent.

168

Data:8fd8fee9-3707-4c99-a646-5fe8054d199a | Open Energy Information  

Open Energy Info (EERE)

fd8fee9-3707-4c99-a646-5fe8054d199a fd8fee9-3707-4c99-a646-5fe8054d199a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (400W HPS-Open/Closed) - Existing Pole Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation

169

Data:7322b2fe-026b-400a-895f-ee3d34e4f43d | Open Energy Information  

Open Energy Info (EERE)

fe-026b-400a-895f-ee3d34e4f43d fe-026b-400a-895f-ee3d34e4f43d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Concord, North Carolina (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: General Service- Time of Use Sector: Commercial Description: Available only to non-residential loads with a demand greater than or equal to 100 kW during at least three months of a twelve-month period and an average annual load factor of at least 55%. Service under this Schedule should be used for a Customer with a single enterprise located entirely on a single, contiguous premise.

170

Data:D727248f-ee36-4ca8-8fb3-e9d93f575de0 | Open Energy Information  

Open Energy Info (EERE)

7248f-ee36-4ca8-8fb3-e9d93f575de0 7248f-ee36-4ca8-8fb3-e9d93f575de0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mitchell Electric Member Corp Effective date: End date if known: Rate name: SCHEDULE LLS-14 Sector: Description: AVAILABILITY Throughout the Cooperative's service area from existing lines of adequate capacity in accordance with the Service Rules and Regulations and subject to the execution of a written agreement for service between the Cooperative and the consumer. Service under this schedule is not available for temporary, standby, or breakdown service or for parallel operation.

171

Data:95c01297-25d4-4abd-931f-7c0fee51dbbb | Open Energy Information  

Open Energy Info (EERE)

1297-25d4-4abd-931f-7c0fee51dbbb 1297-25d4-4abd-931f-7c0fee51dbbb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: KEM Electric Coop Inc Effective date: End date if known: Rate name: Grain Drying Controlled - Three Phase/Submeter Sector: Commercial Description: Available to all members who are drying agricultural crops. Type of Service This is a sub-meter service. Single phase greater than 50 kVa or three phase, 60 cycles, at secondary voltages. The Cooperative will provide sub-meter, meter socket, and C.T. equipment, and load management device necessary to measure and interrupt electric usage.

172

Data:Fee0631d-1763-440b-9014-ac4cd388a9e2 | Open Energy Information  

Open Energy Info (EERE)

Fee0631d-1763-440b-9014-ac4cd388a9e2 Fee0631d-1763-440b-9014-ac4cd388a9e2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Utility District No 2 Effective date: 2011/10/01 End date if known: Rate name: Small Commercial Single Phase Sector: Commercial Description: This schedule is applicable to SMALL commercial and other services not eligible under other rate schedules where measured demand is less than 50 kW. Commercial accounts are billed on a regular monthly cycle. Power Cost Adjustment Factor = 7% The Power Cost Adjustment is based on rate adjustments from BPA . Minimum Charge Single Phase - $ 21.00 per meter per month

173

Data:F8fee5d3-3ff9-4cb3-8745-ce6b96824719 | Open Energy Information  

Open Energy Info (EERE)

fee5d3-3ff9-4cb3-8745-ce6b96824719 fee5d3-3ff9-4cb3-8745-ce6b96824719 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2004/02/21 End date if known: Rate name: Single Phase Master Metered (Non Demand) RV Parks (400-499 local access) Sector: Residential Description: Service under this schedule is available to master-metered mobile home parks and recreational vehicle (RV) parks. The type of service provided under this schedule is single phase, at the standard voltage available for the premises to be served, supplied through one meter at one point of delivery.

174

Data:90368ef0-e63f-4683-9c8f-ee6e563cef0b | Open Energy Information  

Open Energy Info (EERE)

368ef0-e63f-4683-9c8f-ee6e563cef0b 368ef0-e63f-4683-9c8f-ee6e563cef0b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Black River Falls, Wisconsin (Utility Company) Effective date: 2010/04/15 End date if known: Rate name: Street Lighting - Ms-1 - Contributed Lights 150 W HPS (100% contributed) Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will install and maintain street lighting units. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=550 Source Parent: Comments Applicability

175

Data:1fa28776-b008-449b-8dd7-8491526fee38 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:1fa28776-b008-449b-8dd7-8491526fee38 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2013/11/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 1 - RESIDENTIAL SERVICE NSS (Non-Retail) Sector: Residential Description: APPLICABLE TO THE USE OF SERVICE FOR: Residential Customers in individual private dwellings, flats or apartments, and Religious Customers utilizing service exclusively in connection with religious purposes by a corporation or association organized and conducted in good faith for religious purposes. Applicable also to use exclusively in connection with a community residence for the mentally disabled, as defined in subdivision 28, 28-a, or 28-b of section 1.03 of the mental hygiene law, provided that such residence is operated by a not-for-profit corporation and, if supervisory staff is on site 24 hours a day, that the residence provides living accommodations for 14 or fewer residents. Also applicable to any not-for-profit corporation that is a veterans' organization that owns or leases a post or hall. Flat rate Adjustments = Transition Charge+MFC

176

Data:4b09a129-5371-4f7c-9fee-f53c3d9e67b4 | Open Energy Information  

Open Energy Info (EERE)

5371-4f7c-9fee-f53c3d9e67b4 5371-4f7c-9fee-f53c3d9e67b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2010/10/26 End date if known: Rate name: Cp-2 Large Power Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0844 per kilowatt-hour.

177

Data:Eb91fee3-46d3-42d9-8075-dbdf640fd8b6 | Open Energy Information  

Open Energy Info (EERE)

fee3-46d3-42d9-8075-dbdf640fd8b6 fee3-46d3-42d9-8075-dbdf640fd8b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NM Effective date: 2011/08/21 End date if known: Rate name: 20 Streetlights and Floodlights 6400 Lumen 70 Watt High Pressure Sodium Streetlight Customer Owned Sector: Lighting Description: Applicable to street lighting and floodlighting systems and under contract with any municipal corporation or other political subdivision within the State of New Mexico. Available within the incorporated limits of cities and towns and adjacent territory served by the Company in its Albuquerque, Valencia, Sandoval, Clayton, Deming, Las Vegas, East Mountain, and Santa Fe Divisions and territory contiguous thereto.

178

Data:Fee5325b-2393-4aed-86b0-ccd004b1eb6f | Open Energy Information  

Open Energy Info (EERE)

Fee5325b-2393-4aed-86b0-ccd004b1eb6f Fee5325b-2393-4aed-86b0-ccd004b1eb6f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barron, Wisconsin (Utility Company) Effective date: 2009/07/15 End date if known: Rate name: Gs-2 General Service-Optional Time-of-Day Single Phase Sector: Commercial Description: Application: This rate schedule is optional to all Gs-1, General Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Fixed Monthly Charge includes Commitment to Community Rider: $3.00 per customer per month

179

Data:Dbe25a1e-0788-49b1-8754-82fee5bf271f | Open Energy Information  

Open Energy Info (EERE)

Dbe25a1e-0788-49b1-8754-82fee5bf271f Dbe25a1e-0788-49b1-8754-82fee5bf271f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: GS Urban-Three Phase Sector: Residential Description: Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH (Added to All Above Energy Rates) Controlled Water Heater Credit $.00736/KWH Applies to the first 1,000 KWHs each month (October-March) Source or reference: http://www.nodakelectric.com/wp-content/uploads/2011/04/General-Service-Rate-Urban1.pdf

180

Data:C5cc335b-19b8-46fe-b828-d09fee0617ec | Open Energy Information  

Open Energy Info (EERE)

35b-19b8-46fe-b828-d09fee0617ec 35b-19b8-46fe-b828-d09fee0617ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: OUTDOOR LIGHTING MV-11* 250 W Sector: Lighting Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. APPLICATION OF SCHEDULE: This schedule is applicable to any Customer for automatically operated dusk to dawn outdoor lighting supplied and operated by the Company.*Due to the U.S. Government Energy Act of 2005, after August 1, 2008, the Company will no longer install Mercury Vapor fixtures for new installations.

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Data:F289425d-2fee-45ba-be38-9d3283bc51a9 | Open Energy Information  

Open Energy Info (EERE)

F289425d-2fee-45ba-be38-9d3283bc51a9 F289425d-2fee-45ba-be38-9d3283bc51a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate GS-FL: OPTIONAL UNMETERED GENERAL SERVICE RATE FOR SMALL FIXED LOADS - under 540 hours Sector: Commercial Description: Applicable to electric service in the Company's entire territory where secondary distribution lines exist for any fixed electric load that can be served by a standard service drop from the Company's existing secondary distribution system. For customers taking service under any or all of the provisions of this tariff schedule, this same schedule shall constitute the Company's Standard Service Offer.

182

Data:026252f1-6b41-4fee-9f3f-7cce15266aee | Open Energy Information  

Open Energy Info (EERE)

2f1-6b41-4fee-9f3f-7cce15266aee 2f1-6b41-4fee-9f3f-7cce15266aee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

183

Data:51dec43f-216e-4fee-b2ac-6f68d5ad42db | Open Energy Information  

Open Energy Info (EERE)

dec43f-216e-4fee-b2ac-6f68d5ad42db dec43f-216e-4fee-b2ac-6f68d5ad42db No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Illuminating Co Effective date: 2008/11/01 End date if known: Rate name: NE Sector: Description: Availability: This rider is available to any Distributed Generating Facility on the Customer's Premises with installed nameplate capacity of 500 kilowatts or less if fueled by a Non Class I renewable energy resource, or 50 kilowatts or less if a Fossil Fuel is used. Metering: Customers electing service under this rider in conjunction with a demand-metered supplemental service rate shall be metered by two meters, one meter to measure supplemental service sold to the Customer and one meter to measure kilowatt hours purchased by the Company. Customers electing service under this rider and a non-demand metered supplemental service rate may be metered by one meter. The appropriate meter provision(s) will be provided by the Customer. The Company may install, at its own cost, time-differentiated meters for load research purposes.

184

Data:3ea0fee4-3855-46d5-8ef4-0e966af0073f | Open Energy Information  

Open Energy Info (EERE)

fee4-3855-46d5-8ef4-0e966af0073f fee4-3855-46d5-8ef4-0e966af0073f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 5,000kW Demand 8am-8pm Primary Metering and Transformer Ownership Discount (2,300-15,000 volts)with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

185

Data:B6577e2e-fee7-4b31-a4d9-1559df47d447 | Open Energy Information  

Open Energy Info (EERE)

e-fee7-4b31-a4d9-1559df47d447 e-fee7-4b31-a4d9-1559df47d447 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hartford Electric Effective date: 2005/07/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0452 per kilowatt-hour.

186

Data:50191a82-61be-44c0-95d9-13a0eb483fee | Open Energy Information  

Open Energy Info (EERE)

a82-61be-44c0-95d9-13a0eb483fee a82-61be-44c0-95d9-13a0eb483fee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cedarburg Light & Water Comm Effective date: 2011/01/01 End date if known: Rate name: Small Power Optional Time-of-Day Rate - between 50kW and 200kW Demand Transformer Ownership Discount Sector: Industrial Description: "On-Peak" period: 8 a.m. to 8 p.m., Monday through Friday, excluding holidays. Customers on this or the optional time-of-day rate who are metered on the primary side receive a discount. A discount is also available for customers who own and maintain their own transformer.

187

Data:Fee392a9-6caf-4df1-94f3-c4ab26871a3e | Open Energy Information  

Open Energy Info (EERE)

Fee392a9-6caf-4df1-94f3-c4ab26871a3e Fee392a9-6caf-4df1-94f3-c4ab26871a3e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Business Schedule - MMRA-16 (Primary voltage) Sector: Residential Description: Applicable to electric service for the total electrical requirements of master-metered residential apartment complexes where the complex owns, operates, and maintains its own distribution system and distributes electric service to individual family apartments for domestic purposes, and other uses such as central air conditioning and heating, laundry, lighting, and water heating, where all such services are provided only for the apartment complex. Such other uses may be separated from service used within the individual apartment and served on a general service rate schedule. Service hereunder is for the exclusive use of the apartment complex, for itself and its residential tenants and is not to be used for standby, resold, except as may be furnished to its tenants, if no specific charge is made therefor, and is not available to other parties within or without the apartment complex for commercial establishments. Service hereunder shall be supplied at one point of delivery and measured through one meter. Service hereunder is subject to any of Company's rider schedules that may be applicable.

188

MICHALE SEAN FEE Curriculum Vitae  

E-Print Network [OSTI]

;Packer, Adam, 2006 Repak, Emilianne, fall 2006 to spring 2007 Ichinco, Denise, fall 2007 Lubell, Eric

Fee, Michale S.

189

UNIVERSITY OF NEBRASKA-LINCOLN SPECIAL FEES  

E-Print Network [OSTI]

Pre-'95 CASNR AGRI 311 Study Tours U.S. Agriculture Varies Pre-'95 CASNR AGRI 388 (NRES 388 AGRO 315 Genetics 20 Pre-'95 CASNR AGRO 327 (HORT/PGAM/TLMT 327) Turfgrass Science and Management 50 & Archaeology 15 2003 FPA AHIS 313 Roman Art & Archaeology 15 2003 FPA AHIS 318 Late Medieval Art in Europe 15

Farritor, Shane

190

UNIVERSITY OF NEBRASKA-LINCOLN SPECIAL FEES  

E-Print Network [OSTI]

Architecture 15 2002 FPA AHIS 413/813 Roman Painting 15 2003 FPA AHIS 418/818 Gothic Painting & Prints 15 2003 40 2000 ANR AGRI 310 Study Tours International Ag Varies Pre-'95 ANR AGRI 311 Study Tours U.S. Ag Varies Pre-'95 ANR AGRI 388 (NRES 388) Employment Seminar 25 2012 ANR AGRO 127 (HORT/TLMT 127) Turfgrass

Farritor, Shane

191

DALHOUSIE UNIVERSITY APPLICATION FOR TUITION FEE WAIVER  

E-Print Network [OSTI]

notes on waiver process on Procedures document or EOD website. * Only tuition amount is waived. Other Tax information on the Procedures document or EOD website. * Termination of employment will cancel any Group Account Number ________ - 6390 Student Accounts Authorization EOD Authorized Signature Date

Brownstone, Rob

192

Award Fee Determination Scorecard Contractor: Washington River...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tank (DST) System Excellent SEA 2: Performance of Tank Farms Project Operations - Conduct of Operations Very Good SEA 3: Cost Performance Very Good SEA 4: Quality Assurance...

193

STUDENT HEALTH SERVICES MOST COMMON LAB FEES  

E-Print Network [OSTI]

Base $55.00 Pregnancy Urine Pregnancy Urine $21.90 RPR Test For Syphilis $22.94 Sickle Cell Sickle Cell

Tullos, Desiree

194

Award Fee Determination Scorecard Contractor: Bechtel National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

lessons learned. The contractor's management team continued to emphasize becoming a learning organization with a specific emphasis on organizational effectiveness. Key Areas...

195

Undergraduate fees International students 2014/15  

E-Print Network [OSTI]

(Hons) Chelmsford �9,800 Architecture BSc (Hons) Chelmsford �9,800 Audio and Music Technology BSc (Hons) University Centre Peterborough �9,800 Civil Engineering FdSc University Centre Peterborough �10,300 Civil Engineering BSc (Hons) Chelmsford �10,300 Civil Engineering BEng (Hons) Chelmsford �10,300 Civil Engineering

Chittka, Lars

196

Facilities OperationsFacilities Operations Service Fee/Charge GuidelinesService Fee/Charge Guidelines  

E-Print Network [OSTI]

buildings" including: · Maintenance of buildings, major systems & equipment (e.g. HVAC, electrical, plumbing - Expenditures required to adapt the facility to evolving needs of the university, or to changing standards

Holsinger, Kent

197

Undergraduate fees for International Students 2014/15 1 Undergraduate fees  

E-Print Network [OSTI]

,800 Architecture BSc (Hons) Chelmsford £9,800 Audio and Music Technology BSc (Hons) Cambridge £10,300 Biomedical Peterborough £9,800 Civil Engineering FdSc University Centre Peterborough £10,300 Civil Engineering BSc (Hons) Chelmsford £10,300 Civil Engineering BEng (Hons) Chelmsford £10,300 Civil Engineering FdSc Chelmsford £10

Chittka, Lars

198

Gordon Fee, part 2 | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

out looking for jobs. They were laying off, and so I was very fortunate that Union Carbide who was the operating contractor at K-25 in those days decided that I could make a...

199

Gordon Fee, part 1 | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

They had become quite known in the plant that when every time we got a new machine tool and it obviously had to be tested. And what better way to test it was on some very,...

200

UNIVERSITY OF STRATHCLYDE FEE LEVELS 2014/2015  

E-Print Network [OSTI]

programmes MSc in Ship & Offshore Technology (2-year MSc joint with Technical University of Hamburg) (see 940 Project £0 £0 MSc/PGDip Power Plant Engineering MSc/PGDip in Project Management For students first

Strathclyde, University of

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

UNIVERSITY OF STRATHCLYDE FEE LEVELS 2014/2015  

E-Print Network [OSTI]

and Procurement Management International Taught Postgraduate programmes MSc in Ship & Offshore Technology (2-year,900 £1,900 EV 940 Project £0 £0 MSc/PGDip Power Plant Engineering MSc/PGDip in Project Management

Strathclyde, University of

202

UNIVERSITY OF STRATHCLYDE FEE LEVELS 2014/2015  

E-Print Network [OSTI]

programmes MSc in Ship & Offshore Technology (2-year MSc joint with Technical University of Hamburg) (see/PGDip Power Plant Engineering MSc/PGDip in Project Management For students first registering prior to 14

Strathclyde, University of

203

THE UNIVERSITY OF BRITISH COLUMBIA Full fees proposed  

E-Print Network [OSTI]

will also advise on a personal security plan for the campus, review and advise on personal security issues

Farrell, Anthony P.

204

NREL: Solar STAT Blog - Utah: Monthly Net Energy Metering Fees...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

blog in a four-part series of articles in which we discuss either the valuation of solar to the grid and various stakeholders or value-of-solar (VOS) tariffs and policies. For...

205

Microsoft Word - FY12 Fee Des.doc  

National Nuclear Security Administration (NNSA)

procurement for FEMP designated products (5) Environmentally preferable and energy efficient electronics including desktop computers, laptops and monitors are at...

206

Alternative Fuels Data Center: State Fees as Transportation Funding...  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

The AFDC is a resource of the U.S. Department of Energy's Clean Cities program. Contacts | Web Site Policies | U.S. Department of Energy | USA.gov Content Last Updated: 0902...

207

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments  

E-Print Network [OSTI]

container; 2) slide mailer 1) Refrigerate. Ship in insulated container with ice pack. 2) Not required *May-3) Refrigerate. Ship in insulated container with ice pack. 4) Not required *May qualify for New York State container 1-3) Refrigerate. Ship in insulated container with ice pack For more information, see Appendix

Keinan, Alon

208

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments  

E-Print Network [OSTI]

sterile container; 2) slide mailer 1) Refrigerate. Ship in insulated container with ice pack. 2) Slide mailer 1-3) Refrigerate. Ship in insulated container with ice pack. 4) Not required *May qualify; 3) sterile container 1-3) Refrigerate. Ship in insulated container with ice pack For more

Keinan, Alon

209

Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments  

E-Print Network [OSTI]

container; 2) slide mailer 1) Refrigerate. Ship in insulated container with ice pack. 2) Not required *May container 1-3) Refrigerate. Ship in insulated container with ice pack For more information, see Appendix Freeze. Ship in insulated container with ice packs. Plasma must be separated from cells and frozen within

Keinan, Alon

210

Microsoft Word - KCP Contract Mod M120.doc  

National Nuclear Security Administration (NNSA)

20 20 Contract No. DE-AC04-01AL66850 Page 2 of 56 1. Section B.2, ESTIMATED COST, MAXIMUM AVAILABLE FEE, AND AVAILABLE FEE, is amended to read as follows: B.2 ESTIMATED COST, MAXIMUM AVAILABLE FEE, AND AVAILABLE FEE (a) Paragraphs (b) through (c), below, set forth the Estimated Cost, Maximum Available Fee, and Available Fee for the Contract term(s). At the start of each fiscal year, these paragraphs will be reviewed to include the appropriate figures for the upcoming fiscal year. (b) The Estimated Cost of the specified Contract periods, exclusive of the Contractor's Basic Fee, if any, and Award Fee is set forth below: Contract Period Estimated Costs January 1, 2001, through September 30, 2001 $277,000,000 October 1, 2001, through September 30, 2002 $443,448,000

211

Microsoft Word - KCP Contract Mod M107.doc  

National Nuclear Security Administration (NNSA)

07 07 Contract No. DE-AC04-01AL66850 Page 2 of 65 1. Section B.2, ESTIMATED COST, MAXIMUM AVAILABLE FEE, AND AVAILABLE FEE, is amended to read as follows: B.2 ESTIMATED COST, MAXIMUM AVAILABLE FEE, AND AVAILABLE FEE (a) Paragraphs (b) through (c), below, set forth the Estimated Cost, Maximum Available Fee, and Available Fee for the Contract term(s). At the start of each fiscal year, these paragraphs will be reviewed to include the appropriate figures for the upcoming fiscal year. (b) The Estimated Cost of the specified Contract periods, exclusive of the Contractor's Basic Fee, if any, and Award Fee is set forth below: Contract Period Estimated Costs January 1, 2001, through September 30, 2001 $277,000,000 October 1, 2001, through September 30, 2002 $443,448,000

212

Steps for Making a Gift of Real Estate N O T E S F R O M T H E O F F I C E O F G I F T P L A N N I N G  

E-Print Network [OSTI]

utilities, grounds care, snow removal, caretaker fees and condominium fees. In addition, the University

213

Contractor: Contract Number: Contract Type: Total Estimated  

Broader source: Energy.gov (indexed) [DOE]

Number: Number: Contract Type: Total Estimated Contract Cost: Performance Period Total Fee Earned FY2008 $2,550,203 FY2009 $39,646,446 FY2010 $64,874,187 FY2011 $66,253,207 FY2012 $41,492,503 FY2013 $0 FY2014 FY2015 FY2016 FY2017 FY2018 Cumulative Fee Earned $214,816,546 Fee Available $2,550,203 Minimum Fee $77,931,569 $69,660,249 Savannah River Nuclear Solutions LLC $458,687,779 $0 Maximum Fee Fee Information $88,851,963 EM Contractor Fee Site: Savannah River Site Office, Aiken, SC Contract Name: Management & Operating Contract September 2013 DE-AC09-08SR22470

214

Fees are subject to change. See studyguide.au.dk *PLACE OF STUDY  

E-Print Network [OSTI]

and conditions of a given conflict. A NEW APPROACH TO ENVIRONMENTAL AND CLIMATE CHANGE In recent years, the grow- ing challenges posed by global environmental and climate change threaten to trigger a rapid that are of particular relevance to developing countries. They are well placed to build a career in national or interna

215

E-Print Network 3.0 - audit fees evidence Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

University of Alberta Collection: Chemistry ; Biology and Medicine 2 Auditing in Egypt: A Study of Challenges, Problems, and Possibility of an Automatic Formulation of the...

216

1987 Federal interim storage fee study: A technical and economic analysis  

SciTech Connect (OSTI)

This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs.

Not Available

1987-09-01T23:59:59.000Z

217

1988 Federal Interim Storage Fee study: A technical and economic analysis  

SciTech Connect (OSTI)

This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). The information in this report, which was prepared by E.R. Johnson Associates, Inc., under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program. The FIS Program was mandated by the Nuclear Waste Policy Act of 1982. The information will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1989. 13 refs.

Not Available

1988-11-01T23:59:59.000Z

218

Fees are subject to change. See studyguide.au.dk *PLACE OF STUDY  

E-Print Network [OSTI]

and their employment prospects are extremely good, whether in Aarhus, the rest of Denmark or abroad. Statistics masters.au.dk/statistics What should your home contents insurance cost? How many people will survive a particular disease? What are the odds of winning a game of solitaire? The two-year MSc in Statistics is open

219

FIRSTCLASSpReSoRTed poSTAGe&FeeSpAId  

E-Print Network [OSTI]

lower themselves into 200-foot pits. Pale stalactites hang dripping from the cavern ceiling above them

Rau, Don C.

220

College Based Fee 2002/03-2008/09 Department of Physics  

E-Print Network [OSTI]

and travel. Equipment for teaching labs The infusion of CBF funds into the teaching laboratories has been

Sze, Lawrence

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Award\tFee\tDetermination\tScorecard Contractor: G4S Government...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Achievements: WSI-SRS was very effective in their response and execution of site security and support activities throughout adverse winter storms resulting in site closure...

222

Registration fee: $5.00 Payable to: Cheshire Beef Field Day  

E-Print Network [OSTI]

's Italian Style Pizza Heather and Thistle Style Lounge Salon Cheshire Village Pizza Terra Nova Organic members include 4-H members, leaders and parents from Switch'n Horns 4-H Club and Pitcher Mountain 4-H

New Hampshire, University of

223

Human Services in a Market Economy: Implications of Program Fee Reliance among Nonprofit Human Service Organizations  

E-Print Network [OSTI]

of Profits. Stanford Social Innovation Review, Winter 2004,for innovation (e.g. , the Social Innovation Fund, pay formarket-focused social innovations, reduced cost structures,

Howard, David Benjamin

2013-01-01T23:59:59.000Z

224

FEDERAL HIGHWAY-USER FEES 1/ OCTOBER 2001 TABLE FE-21B  

E-Print Network [OSTI]

, or other liquid used fuel in a motor vehicle except diesel, kerosene, gas oil, fuel oil, or a product STORAGE TANK TRUST FUND Fuel Taxes (Cents per Gallon) Gasoline 18.3 01/01/96 12 2 - 4.3 18.4 10/01/97 15 fuels 2/ 3/ 18.3 01/01/96 12 2 - 4.3 Liquefied Petroleum Gas 13.6 10/01/97 11.47 2.13 - - Liquefied

225

Office of the Vice-President, Finance and Finance Commission APPLICATION FOR OPTING INTO AMS FEES  

E-Print Network [OSTI]

for on the Student Service Centre website. PERSONAL INFORMATION LEGAL NAME (SURENAME, FIRST NAME) STUDENT NUMBER

Pulfrey, David L.

226

SUMMARY OF PROPOSED AMENDMENT TO REGULATION 6C2R-2.024, TUITION AND FEES  

E-Print Network [OSTI]

of General Counsel 424 Westcott Building Florida State University Tallahassee, FL 32306-1400 Electronic

Sura, Philip

227

Warren Place Apartment Community (287 Students / Co-ed by Apartment / Tier 3 Single Occupancy Fee)  

E-Print Network [OSTI]

, 72"wide x 24"deep x 30"high. Desks are designed with three modular components to allow the resident, a dishwasher, a microwave, a full-size refrigerator and a stove to be shared by all residents in the apartment. Extra microwaves and/or refrigerators brought by students are not allowed. #12;Bathrooms: Apartments

Kunkle, Tom

228

Fees are subject to change. See studyguide.au.dk *PLACE OF STUDY  

E-Print Network [OSTI]

masters.au.dk/sciencestudies Science and technology form part of our day-to-day lives wherever we are. The MSc in Science Studies provides you with insight into how scientific discoveries and knowledge have that science provides. SCIENCE, CULTURE AND SOCIETY The MSc in Science Studies is open to students with a BSc

229

Fees are subject to change. See studyguide.au.dk *PLACE OF STUDY  

E-Print Network [OSTI]

; protectionism and `fair trade'; health and education; and developing countries. Sustainable Production to sustainability, for example energy or infrastructure projects. In the Seminar on Environmental Issues, each bachelor.au.dk/en/sustainability BSC IN ECONOMICS AND BUSINESS ADMINISTRATION ­ SUSTAINABILITY* SUSTAINABLE

230

FINANCING ELECTRONIC WASTE RECYCLING - Californian Households Willingness to Pay Advanced Recycling Fees  

E-Print Network [OSTI]

to pay for curbside recycling; A comparison of payment carefees needed to sustain recycling of covered electronicsbehavior: waste recycling in Hong Kong. Journal of

Nixon, Hilary; Saphores, Jean-Daniel M

2007-01-01T23:59:59.000Z

231

SORT BY TEST Animal Health Diagnostic Center Test and Fee Schedule  

E-Print Network [OSTI]

container; 2) slide mailer 1) Refrigerate. Ship in insulated container with ice pack. 2) Not required *May-3) Refrigerate. Ship in insulated container with ice pack. 4) Not required *May qualify for New York State container 1-3) Refrigerate. Ship in insulated container with ice pack For more information, see Appendix

Keinan, Alon

232

Fees are subject to change. See studyguide.au.dk *PLACE OF STUDY  

E-Print Network [OSTI]

; and Applied Economic Consulting, which simulates the entire process surrounding a real-world economic problems in international contexts have spurred a growing demand for international economic consult- ing services. These problems are situated on the borderline between economics and management. Multinationals

233

Fees are subject to change. See studyguide.au.dk *PLACE OF STUDY  

E-Print Network [OSTI]

.au.dk/chemistrybiotechnology Developing and optimising chemical and biotechnological processes plays a key role in modern society. It is predicted that the industry of the future will be characterised by production that is environmentally correct and energy-efficient. As a graduate engineer in Chemistry and Biotech- nology, you

234

2013-14 Tuition-Fees OGS 6/12/2013  

E-Print Network [OSTI]

.00 12.00 12.00 36.00 Health Insurance 957.00 957.00 957.00 2,871.00 TOTAL $5,216.50 $5,216.50 $5.00 36.00 Health Insurance 957.00 957.00 957.00 2,871.00 SUBTOTAL 5,216.50 5,216.50 5,216.50 15.00 12.00 12.00 36.00 Health Insurance 957.00 957.00 957.00 2,871.00 SUBTOTAL 5,216.50 5,216.50 5

Wang, Deli

235

How to find fees, taxes, and other charges built into rate in...  

Open Energy Info (EERE)

> Utility Rate Hi, I am looking to find the rate charges beyond demand, generation, and transmission that are worked into most utility bills. Is there a good resource for how to...

236

Fees are subject to change. See studyguide.au.dk *PLACE OF STUDY  

E-Print Network [OSTI]

of the tower of a wind turbine. I subsequently got a job as technical project manager in the same department include: How do you design the blades of a wind turbine? How do you calculate the lifetime of a computer Wind Power #12;

237

Subject Course Course Title 13-14 Lab Fee AGR 4911 Sr Honors Res Lab $100  

E-Print Network [OSTI]

Lab $100 AGED 4821 Adv Ed App Micro Lab $100 AGED 6011 Instr Methods Lab $100 AGED 6251 Teach Ag Mech Lab $150 AGED 6801 Digital Classrm Lab $100 AGED 6821 Adv Ed App Micro Lab $100 AGED 7361 Internshp Drain Irrig Lab $100 AGM 4051 Env Control Lab $100 AGM 4061 Mech & Hydro Sys Lab $100 AGM 4101 Precision

Duchowski, Andrew T.

238

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Electric Vehicle (EV) Fee EV operators must pay an annual vehicle registration renewal fee of 100. This fee expires if the legislature imposes a vehicle miles traveled fee or tax...

239

Nonlinear optics at maximum coherence  

Science Journals Connector (OSTI)

...D. Walls Nonlinear optics at maximum coherence S. E. Harris G. Y. Yin M. Jain H...optical processes which utilize maximum coherence of a non-allowed transition. The nonlinear...frequency. Nonlinear optics at maximum coherence B y S. E. Harris, G. Y. Yin, M...

1997-01-01T23:59:59.000Z

240

ORISE: Health Physics in Radiation Emergencies | REAC/TS Continuing...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Health Physics in Radiation Emergencies Dates Scheduled Register Online March 9-13, 2015 June 8-12, 2015 Fee: 225 Maximum enrollment: 24 32 hours American Academy of Health...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

state PEV license plates are also exempt from parking fees, except when parked at a meter for more than 2.5 hours or the maximum time allowed to park, whichever is longer....

242

FY15 Medical Center Parking Rates There is a fee to park based on proximity to the facility.  

E-Print Network [OSTI]

than 35 hrs.) Shuttle Lots Lot 24-Scottsville Rd, Lot 28-RPC $306.00 $229.50 $153.00 Off-Site Lots Lot Parking $306.00 $229.50 $153.00 Car Pool Shuttle Lots CP2 $76.50 CP3 $25.50 CP4 $0.00 Off-Site Lots $114.25 $0.00 Lot 33-College Town Garage $424.50 $141.50 $0.00 Alternates $35.00 Off-Site Permits = one half

Portman, Douglas

243

Passport Checklist for Adult Applicants (age 16 or older) Check or money order for fees payable to Department of State  

E-Print Network [OSTI]

proof of U.S. citizenship such as a U.S. birth certificate naturalization certificate, Consular Report of Birth Abroad, or previously issued U.S. Passport. Copies are not acceptable. Birth certificates may of the· applicant's parent(s) to be listed on all certified birth certificates to be considered

Hull, Elaine

244

Registration and Fees Confirmation Form For Full-Time McMaster Students on a Letter of Permission  

E-Print Network [OSTI]

; and disclosure to or on behalf of the applicable McMaster student government. This information is protected and is being collected pursuant to section 39(2) and section 42 of the Freedom of Information and Protection/05/09 Course Name (ie. History) Course Code (ie. 2EA3E) Start Date (dd/mm/yy) End Date (dd/mm/yy) #12;

Hitchcock, Adam P.

245

PAYMENT INFORMATION There are several fees that are part of participating in the DOC First Year Trips Program for  

E-Print Network [OSTI]

, provide organic cotton t-shirts for our participants, and use bio-diesel fuel for busses during Trips organic food during the program, provide organic cotton t-shirts for our participants, and use bio-diesel

Lotko, William

246

Summary of Proposed Amendment to University Regulation 6C2R-2.024, Tuition and Fees  

E-Print Network [OSTI]

: Arthur R. Wiedinger, Jr. Office of General Counsel. 424 Westcott Building Florida State University

Sura, Philip

247

Fees are subject to change. See studyguide.au.dk PHYSICS, MATHEMATICS AND NANOSCIENCE INTERNATIONAL STUDY GUIDE 2014  

E-Print Network [OSTI]

, nanocatalysis, nanobiotechnology, nanomedicine, nano- food, toxicology, and ethical aspects of nanotechnology- velopment work in both public and private sectors in medicine, the environment, biotechnology biology, working in the field of nanoscience and nanotechnology. iNANO promotes excellent science

248

Data:51274182-efac-4d2d-854f-ee4468e13286 | Open Energy Information  

Open Energy Info (EERE)

and Regulations. APPLICABILITY: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaires and poles conforming to...

249

Glenn McConnell Residence Hall (240 Students, Co-ed by Floor / Tier 2 Single or Double Occupancy Fee)  

E-Print Network [OSTI]

modular components to allow the resident to customize as desired. The first section has a retractable, a sink, a microwave, a full-size refrigerator, and a pantry to be shared by all residents in the suite. The pantry has individual cabinets for each resident. Extra microwaves and/or mini-refrigerators brought

Kunkle, Tom

250

Data:4832675e-5380-406e-966f-ee9bc16bb159 | Open Energy Information  

Open Energy Info (EERE)

Sector: Commercial Description: Applies to the Counties of Greeley, Wichita, Scott, Hamilton, Kearny, Finney & Gray. Source or reference: http:weci.coopwebbuilder.comsites...

251

The North Carolina Solar Center offers free and fee-based technical services for manufacturers and other  

E-Print Network [OSTI]

, Clean Energy Assessments, Industrial Energy Efficiency Assessments, and Industrial Energy Efficiency.chpcenterse.org. #12;Industrial Energy Efficiency Assessments In a joint effort led by the Mississippi Development, chemical processing, textile, plastics and resins and agribusiness, as well as government, institutional

252

September 19, 2005 Dear Fish Sellers and Fish Buyers  

E-Print Network [OSTI]

1 September 19, 2005 Dear Fish Sellers and Fish Buyers: Our records indicate you are obligated. (1) WHEN DOES THE FEE BEGIN? The fee begins on: October 17, 2005 (2) WHAT HAPPENS THEN? All fish sellers must pay the fee and all fish buyers must collect the fee for all fee fish landed on October 17

253

MaximumLetThrough.PDF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9 9 Maximum Let-Through Currents in the APS Storage Ring Quadrupole, Sextupole, and Corrector Magnets J. Carwardine, D. McGhee, G. Markovich May 18, 1999 Abstract Limits are described for the maximum magnet currents, under specified fault conditions, for the storage ring quadrupole, sextupole, and corrector magnets. Introduction In computing the maximum let-through current for the magnets for the storage ring, several factors must be considered. In general, the maximum current likely to occur even under fault conditions is less than the maximum theoretical DC current given the magnet resistance and the maximum available DC voltage. The first level of protection against magnet current overloads is the over-current interlock that is built into the converter electronics package. The threshold is set to approximately 110% of

254

Single ion heat engine with maximum efficiency at maximum power  

E-Print Network [OSTI]

We propose an experimental scheme to realize a nano heat engine with a single ion. An Otto cycle may be implemented by confining the ion in a linear Paul trap with tapered geometry and coupling it to engineered laser reservoirs. The quantum efficiency at maximum power is analytically determined in various regimes. Moreover, Monte Carlo simulations of the engine are performed that demonstrate its feasibility and its ability to operate at maximum efficiency of 30% under realistic conditions.

Obinna Abah; Johannes Rossnagel; Georg Jacob; Sebastian Deffner; Ferdinand Schmidt-Kaler; Kilian Singer; Eric Lutz

2012-05-07T23:59:59.000Z

255

Microsoft Word - DE-RW0000005.rtf  

Broader source: Energy.gov (indexed) [DOE]

QA QA Contract No.: DE-RW0000005 QA:QA PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS Contract No.: DE-RW0000005 QA:QA i B- PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS TABLE OF CONTENTS B.1 SERVICE BEING ACQUIRED............................................................................. 1 B.2 OBLIGATION OF FUNDS AND FINANCIAL LIMITATIONS......................... 1 B.3 TRANSITION COST, CONTRACT TYPE, ESTIMATED COSTS, MAXIMUM AVAILABLE FEE, AND TOTAL AVIALABLE FEE......................................... 1 B.4 ALLOWABILITY OF SUBCONTRACTOR FEE................................................

256

BWXT/B&W Pantex Contract No. DE-AC04-00AL66620 FY BUDGET  

National Nuclear Security Administration (NNSA)

BWXTB&W Pantex Contract No. DE-AC04-00AL66620 FY BUDGET (LAB TABLE) ESTIMATED COST AWARD FEE AVAILABLE WFO FEE AVAILABLE (Estimated) AVAILABLE FEE FROM OTHER REIMBURSABLE WORK...

257

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Plug-In Electric Vehicle (PEV) Fee PEV owners must pay an annual fee of 50, in addition to other registration fees, for a PEV decal. The decal will authorize PEV owners to use...

258

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Annual Electric Vehicle (EV) Fee The owner of an EV that does not rely on a non-electric source of power must pay a fee of 100 in addition to any other required registration fees...

259

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Biodiesel Blending Facility Loading Fee Deduction In calculating the annual petroleum products loading fee, a facility owner may deduct the number of biodiesel gallons delivered to...

260

CANCELLATION OF REGISTRATION ACA08 Updated May 2014  

E-Print Network [OSTI]

://studentsonline.uct.ac.za 1.7 Refer Section 2.2 of the Student Fees Handbook for fee rebate information. A rebate does

Jarrett, Thomas H.

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Contract Number: Performance Period FY2011 FY2012 FY2013 FY2014  

Office of Environmental Management (EM)

Fee Information August 2011 through April 2019 EM Contractor Fee September 2014 West Valley Demonstration Project - West Valley, NY Site: 477,476,867 West Valley...

262

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Annual Fee Owners of compressed natural gas (CNG), liquefied natural gas (LNG), and propane powered vehicles are required to pay an annual license fee, based on gross vehicle...

263

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Propane and Compressed Natural Gas (CNG) Device Fee The Arizona Department of Weights and Measures collects license fees for certain propane and CNG fueling devices used for...

264

City of Las Vegas 5yr CIP 2010-2014  

National Nuclear Security Administration (NNSA)

LAS VEGAS CAPITAL IMPROVEMENT BUDGET FISCAL YEAR 2010 Sewage Treatment Plants Chemical Tanks Replacements 2,000,000 Service Fees Compliance Directed Projects 500,000 Service Fees...

265

SR-03-04  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Office Manager has determined the award fee amount of the Savannah River Site security contractor, Wackenhut Services Inc.-Savannah River Site. The Award Fee...

266

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Reduced Registration Fee for Electric Vehicles Electric vehicles are eligible for a reduced biennial vehicle registration fee of 38. For more information, refer to the Connecticut...

267

Annual Postdoctoral Research and Career Symposium | Argonne National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nokia, Pacific Northwest National Laboratory, United States Airforce, UOP, Honeywell, Viresco Energy LLC, and Ware Connections Inc. Fee A nominal fee of 200 is...

268

Contract No. DE-AC27-OIRV14136  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

under Contract Clause B.7, Award Fee Determination, and is applicable to the Performance Evaluation and Measurement Plan (PEMP) determination made for Award Fee Period 2011 -A....

269

Secretarial Determination of the Adequacy of the Nuclear Waste...  

Broader source: Energy.gov (indexed) [DOE]

Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee I adopt and approve the attached...

270

SR0018  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rick Ford (803) 725-2889 Wackenhut Receives Award Fee Flag Ribbon Graphic The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services,...

271

SR0008  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wachenhut Receives Award Fee Flag Ribbon Art Note to Editors and News Directors The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut...

272

1. MEMBERSHIP 1.1 Membership of the Institute will be restricted to persons with Post-graduate or  

E-Print Network [OSTI]

have to pay a fee of Rs. 2500.00 less a rebate of Rs. 50.00 for each year for which ordinary annual have to pay a fee of US$ 800.00 less a rebate of US$ 20.00 for each year for which ordinary annual subscription may have been given, subject to a maximum rebate of US$300.00 after continuing membership

Rodriguez, Carlos

273

Boiler Maximum Achievable Control Technology (MACT) Technical...  

Broader source: Energy.gov (indexed) [DOE]

Boiler Maximum Achievable Control Technology (MACT) Technical Assistance - Fact Sheet, May 2014 Boiler Maximum Achievable Control Technology (MACT) Technical Assistance - Fact...

274

Hazardous Waste Disposal Sites (Iowa)  

Broader source: Energy.gov [DOE]

These sections contain information on fees and monitoring relevant to operators of hazardous waste disposal sites.

275

Data:Fee420f7-06b2-414a-9a96-7312c0b82aa7 | Open Energy Information  

Open Energy Info (EERE)

-06b2-414a-9a96-7312c0b82aa7 -06b2-414a-9a96-7312c0b82aa7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 250 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

276

Data:Fee42ed8-81fe-47cd-bb38-7860b5a4b8a0 | Open Energy Information  

Open Energy Info (EERE)

ed8-81fe-47cd-bb38-7860b5a4b8a0 ed8-81fe-47cd-bb38-7860b5a4b8a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Belmont, Wisconsin (Utility Company) Effective date: 2005/01/21 End date if known: Rate name: SL-1 Security Lighting: 100 W HPS Sector: Lighting Description: Available to customers within the utility's service territory for security and/or yard lighting. Commitment to Community Program Rider: Sl-1 Security Lighting 2.0% of the total electric bill Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=440 Source Parent: Comments Applicability

277

Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are  

E-Print Network [OSTI]

Algorithms, Performance. Keywords Human Motion, Avatar Animation, Distributed Virtual Reality. 1 networked virtual environments comprising of power constrained clients such as PDAs, Pocket-PCs and notebook animation data in order to conserve network bandwidth, and save power at the client side during data

Bhandarkar, Suchendra "Suchi" M.

278

FY14 Medical Center Parking Rates There is a fee to park based on proximity to the facility. Part-time  

E-Print Network [OSTI]

Lot 24-Scottsville Rd, Lot 28-RPC $300.00 $150.00 Off-Site Lots Lot 25-CVRI, Lot 26-315 Science Pkwy.00 Lot 28-RPC $210.00 $105.00 Car Pool Shuttle Lots CP2 $75.00 CP3 $25.00 CP4 $0.00 Off-Site Lots $112 8-MRB $462.50 $154.17 $0.00 Alternates $35.00 Off-Site Permits = one half rate of full-time lot

Portman, Douglas

279

120 Check www.uaf.edu/schedule/ for changes to classes, regulations and fees. Area code is 907. FarmersLoopRoad  

E-Print Network [OSTI]

. TROTH YEDDHA' PARK FarmersLoopRoad West Valley Plaza 4001 Geist Road, Suite 6 - Advancement Services

Wagner, Diane

280

Permission to make digital or hard copies of part or all of this work or personal or classroom use is granted without fee  

E-Print Network [OSTI]

ASSIGNMENT USER ASSIGNMENTU UA PA PR RH 52 #12;Quality Engineer 1 (QE1) Engineer 1 (E1) Engineer 2 (E2) Production (PE2) Engineer 2 (QE2) Quality Engineer 2 Engineering Department (ED) Production (PE1) Engineer 1 (a) A Inverted Tree Hierarchy Quality Engineer 1 (QE1) Director (DIR) Project lead 1 (PL1) Project

Sandhu, Ravi

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Sweet Lake geopressured-geothermal project, Magma Gulf-Technadril/DOE Amoco fee. Volume III. Final report. Annual report, February 1982-March 1985  

SciTech Connect (OSTI)

This report presents the results of the testing of Sand 3 (15,245 to 15,280 feet in depth) which occurred from November 1983 to March 1984 and evaluates these new data in comparison to results from the testing of Sand 5 (15,385 to 15,415 feet in depth) which occurred from June 1981 to February 1982. It also describes the reworking of the production and salt water disposal wells preparatory to the Sand 3 testing as well as the plug and abandon procedures requested to terminate the project. The volume contains two parts: Part 1 includes the text and accompanying plates, figures and tables; Part 2 consists of the appendixes including auxiliary reports and tabulations.

Durham, C.O. Jr.; O'Brien, F.D.; Rodgers, R.W. (eds.) [eds.

1985-01-01T23:59:59.000Z

282

15 days from $5,896 total price from Boston, New York ($5,195 air & land inclusive plus $701 airline taxes and departure fees)  

E-Print Network [OSTI]

to the Pyrénées, Carcassonne boasts battlements and ramparts dating to the 1st -century Romans. We return Valley. We travel on to Sarlat-la-Canéda, one of France's prettiest villages and one of Europe's best pre the Caves at Lascaux II, the reproductions of the original pre-historic cave paintings found nearby. After

Spence, Harlan Ernest

283

Data:E32e3fac-39a0-475a-9f89-fee1783eeed9 | Open Energy Information  

Open Energy Info (EERE)

Effective date: 20140101 End date if known: Rate name: Large Industrial Service MI-1 Primary Service Sector: Description: This rate schedule is mandatory for any retail...

284

Permission to copy without fee all or part of this material is granted provided that the copies are not made or distributed for  

E-Print Network [OSTI]

'95, San Jose, CA USA A Critique of ANSI SQL Isolation Levels Hal Berenson Microsoft Corp. haroldb/Boston poneil@cs.umb.edu Abstract: ANSI SQL-92 [MS, ANSI] defines Isolation Levels in terms of phenomena: Dirty Reads, Non-Re- peatable Reads, and Phantoms. This paper shows that these phenomena and the ANSI SQL

O'Neil, Patrick

285

Elk's Lodge All buffet menu requests for guest counts less than 20, will have a $25.00 below minimum fee ap-  

E-Print Network [OSTI]

pieces - $100.00 Jalapeno Poppers with Ranch Dressing 1 Platter serves 100 pieces - $110.00 Crab Rangoon Sauce 1 Platter serves 100 pieces - $125.00 Buffalo Wings with Ranch and Bleu Cheese Dressings 1 Platter Vegetables Display with Ranch Dip 1 Platter serves 50 Guests - $150.00 International & Domestic Cheese Tray

Taylor, Jerry

286

Data:60063fb7-0ce6-41ac-9d4b-28c1fee30190 | Open Energy Information  

Open Energy Info (EERE)

taking single phase electrical service for general commercial usage and for miscellaneous power uses; and where the customer has installed in regular use approved electric space...

287

Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are  

E-Print Network [OSTI]

large size and high numbers of ports result in slow access and high energy dissipation. Figure 1 shows the effects of size and number of ports on access time, energy, and area for 128­, and 256­entry register Register Ports Using Delayed Write­Back Queues And Operand Pre­Fetch Nam Sung Kim and Trevor Mudge Advanced

Mudge, Trevor

288

Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are  

E-Print Network [OSTI]

large size and high numbers of ports result in slow access and high energy dissipation. Figure 1 shows the effects of size and number of ports on access time, energy, and area for 128-, and 256-entry register Register Ports Using Delayed Write-Back Queues And Operand Pre-Fetch Nam Sung Kim and Trevor Mudge Advanced

Mudge, Trevor

289

Data:388dc4fe-e882-4796-8812-e2f54f80c623 | Open Energy Information  

Open Energy Info (EERE)

e882-4796-8812-e2f54f80c623 e882-4796-8812-e2f54f80c623 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Ms-1 Street and Security Lighting Service Overhead Street 150 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

290

Document  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 Department of Energy 970.5223-1 (End of clause) 970.5215-5 Limitation on fee. As prescribed in 48 CFR 970.1504-5(e), the contracting officer shall insert the following provision: LIMITATION ON FEE (DEC 2000) (a) For the purpose of this solicitation, fee amounts shall not exceed the total available fee allowed by the fee policy at 48 CFR 970.1504-1-1, or as specifically stated else- where in the solicitation. (b) The Government reserves the unilateral right, in the event an offeror's proposal is se- lected for award, to limit: fixed fee to not ex- ceed an amount established pursuant to 48 CFR 970.1504-1-5; and total available fee to not exceed an amount established pursuant to 48 CFR 970.1504-1-9; or fixed fee or total available fee to an amount as specifically

291

Cell development obeys maximum Fisher information  

E-Print Network [OSTI]

Eukaryotic cell development has been optimized by natural selection to obey maximal intracellular flux of messenger proteins. This, in turn, implies maximum Fisher information on angular position about a target nuclear pore complex (NPR). The cell is simply modeled as spherical, with cell membrane (CM) diameter 10 micron and concentric nuclear membrane (NM) diameter 6 micron. The NM contains about 3000 nuclear pore complexes (NPCs). Development requires messenger ligands to travel from the CM-NPC-DNA target binding sites. Ligands acquire negative charge by phosphorylation, passing through the cytoplasm over Newtonian trajectories toward positively charged NPCs (utilizing positive nuclear localization sequences). The CM-NPC channel obeys maximized mean protein flux F and Fisher information I at the NPC, with first-order delta I = 0 and approximate 2nd-order delta I = 0 stability to environmental perturbations. Many of its predictions are confirmed, including the dominance of protein pathways of from 1-4 proteins, a 4nm size for the EGFR protein and the approximate flux value F =10^16 proteins/m2-s. After entering the nucleus, each protein ultimately delivers its ligand information to a DNA target site with maximum probability, i.e. maximum Kullback-Liebler entropy HKL. In a smoothness limit HKL approaches IDNA/2, so that the total CM-NPC-DNA channel obeys maximum Fisher I. Thus maximum information approaches non-equilibrium, one condition for life.

B. R. Frieden; R. A. Gatenby

2014-04-29T23:59:59.000Z

292

To: Procurement Directors From: Director Contract and Financial Assistance Policy Division  

Broader source: Energy.gov (indexed) [DOE]

2-26 2-26 Date: March 2, 2012 To: Procurement Directors From: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management Subject: Release of Department of Energy Award Fee and Incentive Fee Reports Summary: To provide a consistent Department of Energy approach on the disclosure of award fee and incentive fee reports (fee determination reports) for management and operating contracts and other major contracts at the Department's sites, the Department will, in the near future, be implementing the following policy: programs shall, at a minimum, publish a one-page score card for each contractor summarizing the fee

293

Notes on Frequentist, Maximum Likelihood & Bayesian Statistics  

E-Print Network [OSTI]

, theory, "gut feeling," etc. · Changes the probability distribution #12;Bayesian Statistics · ProbabilityNotes on Frequentist, Maximum Likelihood & Bayesian Statistics #12;Statistical Methods · Probability is a long-term frequency statement about the data ­ if repeated, what proportion of the time would

Ernest, Holly

294

PublicationsmailagreementNo.40014024 maximum depth  

E-Print Network [OSTI]

and a video camera to complete installation of the world's first regional cabled ocean observatory. NEPTUNE- tion systems that--using power and the internet--provide continuous, long-term monitoring of oceanPublicationsmailagreementNo.40014024 THE 2.7km maximum depth beneath the ocean surface of neptune

Pedersen, Tom

295

Design of maximum density aggregate grading  

Science Journals Connector (OSTI)

An aggregate grading that yields maximum solid density and maximum particle interlock is highly desirable for both bound mixtures, such as asphalt concrete and plain and reinforced concrete, and for unbound mixtures such as those used in base courses. Maximum particle interlock leads to high strength. Whereas minimum voids in a certain material composition is conducive to high strength and low compression. Aggregate grading may be obtained, for instance, from the ASTM, which is based on experience or may be designed according to Lees method. In the present work five different types of aggregates were used, each with a variety of chosen grading. It was found that Lees method produced the lowest porosity of all types of aggregates as well as for the various employed gradings. Lees rational method of aggregate grading, however, is a very lengthy and time-consuming procedure. Therefore, programming of Lees method is an essential step to make such an excellent method available to practicing engineers. A program named ratmix was developed and has incorporated 58 design graphs of the Lees method. ratmix is a comprehensive program for Lees rational method; it conducts interpolation for intermediate points within the design graphs as well as between graphs of different properties.

Yahia A Abdel-Jawad; Waddah Salman Abdullah

2002-01-01T23:59:59.000Z

296

SUPPORT ADMINISTRATIVE SERVICES FOR THE NATIONAL ENERGY TECHNOLOGY  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SUPPORT ADMINISTRATIVE SERVICES FOR THE NATIONAL ENERGY TECHNOLOGY LABORATORY TABLE OF CONTENTS SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS ........................................................................ 8 B.1 SERVICES BEING ACQUIRED - SUPPORT ADMINISTRATIVE SERVICES ................................. 8 B.2 GUARANTEED MINIMUM CONTRACT VALUE - MAXIMUM AVAILABLE PERFORMANCE AWARD FEE ........................................................................................................................................................... 8 B.3 CEILING PRICE OF CONTRACT ............................................................................................................ 8 B.4 ESTIMATED LEVEL OF EFFORT ........................................................................................................... 8

297

Doing Business with New Mexico State  

E-Print Network [OSTI]

that in order to achieve maximum participation we are not charging any fees to utilize this system. To register Department values our suppliers and contractors and invites you to do business with us. The University, with a student body that comes from all over New Mexico, and the U.S., as well as from many foreign countries

Johnson, Eric E.

298

Accelerated maximum likelihood parameter estimation for stochastic biochemical systems  

E-Print Network [OSTI]

as: Daigle et al. : Accelerated maximum likelihood parame-Gillespie DT: Approximate accelerated stochastic simulationARTICLE Open Access Accelerated maximum likelihood parameter

Daigle, Bernie J; Roh, Min K; Petzold, Linda R; Niemi, Jarad

2012-01-01T23:59:59.000Z

299

The Hybrid Maximum Principle is a consequence of Pontryagin ...  

E-Print Network [OSTI]

We give a simple proof of the Maximum Principle for smooth hybrid control sys- ... result in the study of such problems is Hybrid Maximum Principle proved in [4]...

2006-10-31T23:59:59.000Z

300

January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear  

Broader source: Energy.gov (indexed) [DOE]

January 16, 2013 Secretarial Determination of the Adequacy of the January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Secretary has determined not to propose an adjustment to the fee at this time. The Secretary's determination is available here. January 16 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee.pdf More Documents & Publications CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT FY 2007 Fee Adequacy, Pub 2008 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

January 16, 2013 Secretarial Determination of the Adequacy of the January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Secretary has determined not to propose an adjustment to the fee at this time. The Secretary's determination is available here. January 16 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee.pdf More Documents & Publications FY 2007 Fee Adequacy, Pub 2008 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER

302

Microsoft Word - AcqGuide70pt15rev9.doc  

Broader source: Energy.gov (indexed) [DOE]

70.15 (Septeber 2008) 70.15 (Septeber 2008) 1 M&O Contractor Incentives - Fee, Rollover of Performance Fee, and Award Term [Reference, DEAR 970.1504-1] Overview This chapter provides: (1) a synopsis of the M&O contractor fee policy (focused on the mechanics of the calculation and the key considerations of the policy); (2) guidance on a key aspect of the policy, linking performance fee to outcomes, including guidelines on allowing rollover of performance fee; and (3) guidance on the use of the non-fee incentive of award term. In this guide chapter, the term "DOE" refers to both DOE and NNSA. Background M&O contractor fee policy, found at DEAR 970.1504-1, provides a comprehensive approach to determining an appropriate fee for contractors performing DOE M&O contracts and other

303

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Ethanol Production Facility Fee The cost to submit an air quality permit application for an ethanol production plant is 1,000. An annual renewal fee is also required for the...

304

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT...  

National Nuclear Security Administration (NNSA)

original FY 10 fcc (68,700,000), plus 9,064,285 due to increase in Total Estimated Cost and Fee during FY 09. **Note: This amount is the sum ofthe original FY 11 fee...

305

UNIVERSITY OF CAPE TOWN GENERAL RULES AND POLICIES  

E-Print Network [OSTI]

-9111 Internet: UCT Website http://www.uct.ac.za Student Fees: Accounts and Fees (021) 650-1704; (021) 650 or other forms of unfair discrimination, harassment, violence or abuse. To actively promote social justice

Jarrett, Thomas H.

306

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Natural Gas and Propane Vehicle License Fee Beginning July 1, 2015, drivers using natural gas or propane to fuel a vehicle may pay a special use fuel license fee annually in lieu...

307

Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL...  

Energy Savers [EERE]

4-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE Questions concerning this policy flash...

308

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Electric Vehicle (EV) Registration Fee Reduction The owner of a dedicated EV may register for a discounted registration fee not to exceed 35 for a two-year registration period....

309

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study The Interim Study Committee on Road Impact Fees (Committee) will study issues related to the...

310

Office of Environmental Management MAJOR CONTRACTS SUMMARY  

Office of Environmental Management (EM)

3019 The Boeing Company DE-AC03-99SF21530 123198-93019 193.6M Energy Technology Engineering Center Site Support Services Cost plus award feeCost plus fixed fee Portage...

311

Policy Flash 2012-26 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

26 Policy Flash 2012-26 Below is Policy Flash 2012-26, Release of Department of Energy Award Fee and Incentive Fee Reports PolicyFlash2012-26.pdf More Documents & Publications...

312

Freedom of Information Act (FOIA) | OSTI, US Dept of Energy,...  

Office of Scientific and Technical Information (OSTI)

Freedom of Information Act (FOIA) What is the Freedom of Information Act (FOIA)? Who can submit a FOIA request? Submission of a FOIA request FOIA Fees Waiving or Reducing Fees...

313

FY 2009 National Security Technologies, LLC, PER Summary | National...  

National Nuclear Security Administration (NNSA)

Fee Total Fee Earned % 23,150,112 21,529,431 93% National Security Technologies, LLC (NSTec), the management and operating contractor for the Nevada National Security Site,...

314

FY 2008 National Security Technologies, LLC, PER Summary | National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fee Total Fee Earned % 21,915,495 20,818,340 95% National Security Technologies, LLC (NSTec), the management and operating contractor for the Nevada National Security Site,...

315

FY 2006 National Security Technologies, LLC, PER Summary | National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fee Total Fee Earned % 5,717,227 5,431,366 85% National Security Technologies, LLC (NSTec), the management and operating contractor for the Nevada National Security Site,...

316

Handbook for Graduate Students and Advisers (revised September, 2004)  

E-Print Network [OSTI]

Cleaner Energy Technologies Fee Student Organization Resource Fund (SORF) Cultural Programming (CP) Fee and Information Health Service Group Health Insurance Dental and Vision Insurance Illinois Workers' Compensation Program International Programs and Studies University of Illinois Library Campus Information Technologies

Illinois at Urbana-Champaign, University of

317

January 16, 2013 Secretarial Determination of the Adequacy of...  

Broader source: Energy.gov (indexed) [DOE]

January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee As...

318

SR0302  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8, 2003 Media Contact: Rick Ford (803) 725-2889 DOE Announces WSI Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fee earned by...

319

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

has developed a mechanism to charge EVSE users a fee to recover the costs related to electricity consumed, processing the user fee, and EVSE operation and maintenance. NCDOT may...

320

Disclaimer  

National Nuclear Security Administration (NNSA)

these fees. In addition to permit fees, NNSANSO must allow the state of Nevada Bureau of Air Pollution Control to conduct inspections of NTS facilities and operations that are...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Contractor: Contract Number: Contract Type: Total Estimated  

Energy Savers [EERE]

Services Support Contract Fee Information Contract Period: Cost Plus Award Fee 3,311,479,516 September 2014 May 2009 - May 2019 Mission Support Alliance, LLC DE-AC06-09RL14728...

322

Maximum mass of magnetic white dwarfs  

E-Print Network [OSTI]

We revisit in this work the problem of the maximum masses of magnetized White Dwarfs (WD). The impact of a strong magnetic field onto the structure equations is addressed. The pressures become anisotropic due to the presence of the magnetic field and split into a parallel and perpendicular components. We first construct stable solutions of TOV equations for the parallel pressures, and found that physical solutions vanish for the perpendicular pressure when $B \\gtrsim 10^{13}$ G. This fact establishes an upper bound for a magnetic field and the stability of the configurations in the (quasi) spherical approximation. Our findings also indicate that it is not possible to obtain stable magnetized WD with super Chandrasekhar masses because the values of the magnetic field needed for them are higher than this bound. To proceed into the anisotropic regime, we derived structure equations appropriated for a cylindrical metric with anisotropic pressures. From the solutions of the structure equations in cylindrical symme...

Paret, D Manreza; Horvath, J E

2015-01-01T23:59:59.000Z

323

Critical insulation thickness for maximum entropy generation  

Science Journals Connector (OSTI)

Critical insulation thickness is known to refer to the insulation thickness that maximises the rate of heat transfer in cylindrical and spherical systems. The same analogy is extended to the rate of entropy generation in the present study. The possible critical insulation thickness that yields a maximum rate of entropy generation is investigated. Entropy generation is related to heat transfer through and temperature distribution within the insulation material. It is found that there exists a critical insulation thickness for maximising the rate of entropy generation that is a function of the Bi number and the surface to ambient temperature ratio. The solution of such critical thickness is formulated analytically for both cylindrical and spherical geometries. It is also found that the critical insulation thickness for the rate of entropy generation does not coincide with that for the rate of heat transfer.

Ahmet Z. Sahin

2012-01-01T23:59:59.000Z

324

System-Level Abstraction Semantics Andreas Gerstlauer Daniel D. Gajski  

E-Print Network [OSTI]

for persanal or classmm use is granted without fee provided that copies are not made or distributedforprofit

Gerstlauer, Andreas

325

Microsoft PowerPoint - Johnson - How EM Does Business (FINAL...  

Office of Environmental Management (EM)

contract administration within the EM Program includes: * Performance Evaluation Measurement Plans (PEMP) * Fee Determining Official (FDO) Determination * Contractor...

326

Report of GWC participation at Torino, Italy 2 Meeting of MatER (WTERT-Italy), 12-14 September  

E-Print Network [OSTI]

of mercury & Dioxins (on volunteer base). The gate fees of WTE plants are in the range of 50 -110 /ton

327

Nuclear resonance fluorescence in 240Pu  

E-Print Network [OSTI]

Nuclear Research Center (BNRC) through the 00F8F4 University of California Lab Fees Research Program. [

Quiter, Brian

2014-01-01T23:59:59.000Z

328

Building Operations 2329 West Mall  

E-Print Network [OSTI]

Apply Audio Video & Gaming Products $0.00 Rice Cookers Service Fees May Apply Portable Audio Video $0

Handy, Todd C.

329

Waste Disposal (Illinois)  

Broader source: Energy.gov [DOE]

This article lays an outline of waste disposal regulations, permits and fees, hazardous waste management and underground storage tank requirements.

330

Parents Nursery Association Committee Minutes of the Meeting Held at 7.30 pm on 21 September 1999.  

E-Print Network [OSTI]

to cough up for 5 months with no hope of the temporary place being filled? The proposed Retainer Fees

Cowley, Stephen J.

331

Maximum likelihood continuity mapping for fraud detection  

SciTech Connect (OSTI)

The author describes a novel time-series analysis technique called maximum likelihood continuity mapping (MALCOM), and focuses on one application of MALCOM: detecting fraud in medical insurance claims. Given a training data set composed of typical sequences, MALCOM creates a stochastic model of sequence generation, called a continuity map (CM). A CM maximizes the probability of sequences in the training set given the model constraints, CMs can be used to estimate the likelihood of sequences not found in the training set, enabling anomaly detection and sequence prediction--important aspects of data mining. Since MALCOM can be used on sequences of categorical data (e.g., sequences of words) as well as real valued data, MALCOM is also a potential replacement for database search tools such as N-gram analysis. In a recent experiment, MALCOM was used to evaluate the likelihood of patient medical histories, where ``medical history`` is used to mean the sequence of medical procedures performed on a patient. Physicians whose patients had anomalous medical histories (according to MALCOM) were evaluated for fraud by an independent agency. Of the small sample (12 physicians) that has been evaluated, 92% have been determined fraudulent or abusive. Despite the small sample, these results are encouraging.

Hogden, J.

1997-05-01T23:59:59.000Z

332

PLAYER REGISTRATION City State Zip  

E-Print Network [OSTI]

a $100 tax deductible/tax credit donation to Michigan State University. Staff, student and spouse fees are reduced and will not include a tax credit. The balance of the fee covers green fees, cart, lunch ________________________________________________ Name Daytime phone Golfers are registered on a first-come, first-served basis. CREDIT CARD USERS

333

GROUPE D'ANALYSE ET DE THORIE CONOMIQUE LYON -ST TIENNE WP 1407  

E-Print Network [OSTI]

WP 1407 The economics of Bitcoin transaction fees Nicolas-00951358,version1-24Feb2014 #12;The economics of Bitcoin transaction fees v.0.1 Nicolas Houy February 24, 2014 Abstract We study the economics of Bitcoin transaction fees in a simple static partial equilibrium

Paris-Sud XI, Université de

334

www.ext.vt.edu Produced by Communications and Marketing, College of Agriculture and Life Sciences,  

E-Print Network [OSTI]

, 1890 Extension Program, Virginia State, Petersburg. publication 420-720 What Is Fee-fishing? Fee-fishing, or pay-fishing as the name implies, is buy- ing the right to fish in a private pond, lake, or stream. These are excellent places to practice your fishing skills and teach children the fine art of fishing. Fee-fishing

Liskiewicz, Maciej

335

Authoritative Handbook This is the standard reference Handbook for 2012. It contains the final version of course, major and minor structures for the given academic year,  

E-Print Network [OSTI]

Counselling 7 Equity 8 Guild of Students 9 Health Service 9 Information Technology at Murdoch 9 International Regulation 34 Fees and Financial Assistance 35 Fees Legislation 35 Tuition Fees 35 Higher Education Loan November 2011 The information contained within this publication was correct as at the generated date shown

336

Comment on "Efficiency of Isothermal Molecular Machines at Maximum Power"  

E-Print Network [OSTI]

Comment on "Efficiency of Isothermal Molecular Machines at Maximum Power" (PRL 108, 210602 (2012), arXiv:1201.6396)

Yunxin Zhang

2012-06-06T23:59:59.000Z

337

Pattern formation, logistics, and maximum path probability  

Science Journals Connector (OSTI)

The concept of pattern formation, which to current researchers is a synonym for self-organization, carries the connotation of deductive logic together with the process of spontaneous inference. Defining a pattern as an equivalence relation on a set of thermodynamic objects, we establish that a large class of irreversible pattern-forming systems, evolving along idealized quasisteady paths, approaches the stable steady state as a mapping upon the formal deductive imperatives of a propositional function calculus. In the preamble the classical reversible thermodynamics of composite systems is analyzed as an externally manipulated system of space partitioning and classification based on ideal enclosures and diaphragms. The diaphragms have discrete classificationcapabilities which are designated in relation to conserved quantities by descriptors such as impervious, diathermal, and adiabatic. Differentiability in the continuum thermodynamic calculus is invoked as equivalent to analyticity and consistency in the underlying class or sentential calculus. The seat of inference, however, rests with the thermodynamicist. In the transition to an irreversible pattern-forming system the defined nature of the composite reservoirs remains, but a given diaphragm is replaced by a pattern-forming system which by its nature is a spontaneously evolving volume partitioner and classifier of invariants. The seat of volition or inference for the classification system is thus transferred from the experimenter or theoretician to the diaphragm, and with it the full deductive facility. The equivalence relations or partitions associated with the emerging patterns may thus be associated with theorems of the natural pattern-forming calculus. The entropyfunction, together with its derivatives, is the vehicle which relates the logistics of reservoirs and diaphragms to the analog logistics of the continuum. Maximum path probability or second-order differentiability of the entropy in isolation are sufficiently strong interpretations of the second law of thermodynamics to define the approach to and the nature of patterned stable steady states. For many pattern-forming systems these principles define quantifiable stable states as maxima or minima (or both) in the dissipation. An elementary statistical-mechanical proof is offered. To turn the argument full circle, the transformations of the partitions and classes which are predicated upon such minimax entropic paths can through digital modeling be directly identified with the syntactic and inferential elements of deductive logic. It follows therefore that all self-organizing or pattern-forming systems which possess stable steady states approach these states according to the imperatives of formal logic, the optimum pattern with its rich endowment ofequivalence relations representing the central theorem of the associated calculus. Logic is thus the stuff of the universe, and biological evolution with its culmination in the human brain is the most significant example of all the irreversible pattern-forming processes. We thus conclude with a few remarks on the relevance of the contribution to the theory of evolution and to research on artificial intelligence.

J. S. Kirkaldy

1985-05-01T23:59:59.000Z

338

Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0: February 6, 0: February 6, 2006 Maximum Speed Limits by State, 2005 to someone by E-mail Share Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on Facebook Tweet about Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on Twitter Bookmark Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on Google Bookmark Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on Delicious Rank Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on Digg Find More places to share Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on AddThis.com...

339

Engineer End Uses for Maximum Efficiency | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

for Maximum Efficiency (August 2004) More Documents & Publications Maintaining System Air Quality Compressed Air Storage Strategies Alternative Strategies for Low Pressure End Uses...

340

2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND  

Broader source: Energy.gov (indexed) [DOE]

2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE 2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND FEE 2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND FEE As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Office of Standard Contract Management has determined that there is no basis to propose an adjustment to the fee to Congress. The Secretary of Energy has adopted and approved this determination. As a result, the fee will remain at the amount specified in the NWPA pending the next annual review. The Secretary's determination is available here. 2011 Secretarial Fee Adequacy Determination.PDF More Documents & Publications Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE 2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND FEE 2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND FEE As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Office of Standard Contract Management has determined that there is no basis to propose an adjustment to the fee to Congress. The Secretary of Energy has adopted and approved this determination. As a result, the fee will remain at the amount specified in the NWPA pending the next annual review. The Secretary's determination is available here. 2011 Secretarial Fee Adequacy Determination.PDF More Documents & Publications Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee

342

Management Control Cover  

Broader source: Energy.gov (indexed) [DOE]

Performance Fees in the Idaho Performance Fees in the Idaho National Laboratory Contract OAS-M-06-07 August 2006 REPORT ON MANAGEMENT CONTROLS OVER PERFORMANCE FEES IN THE IDAHO NATIONAL LABORATORY CONTRACT TABLE OF CONTENTS Performance Fees Details of Finding 1 Recommendations and Comments 4 Appendices 1. Objective, Scope, and Methodology 6 2. Other Matters 7 3. Related Audit Reports 8 4. Management Comments 9 PERFORMANCE FEES IN THE IDAHO NATIONAL LABORATORY CONTRACT Page 1 Details of Finding Performance Measures The Department of Energy (Department) did not always effectively and Fees use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures

343

Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG)  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Propane and Compressed Propane and Compressed Natural Gas (CNG) Device Fee to someone by E-mail Share Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on Facebook Tweet about Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on Twitter Bookmark Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on Google Bookmark Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on Delicious Rank Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on Digg Find More places to share Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

344

Data:72a32594-a091-45d3-913a-2dba3481d31e | Open Energy Information  

Open Energy Info (EERE)

4-a091-45d3-913a-2dba3481d31e 4-a091-45d3-913a-2dba3481d31e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: San Bernard Electric Coop, Inc Effective date: End date if known: Rate name: 250 W High Pressure Sodium Sector: Lighting Description: Non-standard fixture: $50.00 fixture fee + connect fee Source or reference: http://sbec.coopwebbuilder.com/content/payment-options Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

345

Performance Based Incentive FY13 Contractor: Contract: DE-EM0001971  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Based Incentive Based Incentive FY13 Contractor: Contract: DE-EM0001971 Award Period: Metric 1: Quarter Cubic Meters x $800/m 3 = Fee Earned 1 st 1806.77 $800 $1,445,416 Approved 8/12/2013 2 nd 912.68 $800 $730,144 Approved 9/1/2013 3 rd $800 $0 4 th $800 $0 Totals 2719.45 $2,175,560 Quarter Cubic Meters x $16,000/m 3 = Fee Earned 1 st 14.89 $16,000 $238,240 Approved 8/12/2013 2 nd 6.97 $16,000 $111,520 Approved 9/1/2013 3 rd $16,000 $0 4 th $16,000 $0 Totals 21.86 $349,760 PBI formula PBI Fee Earned Basis of Evaluation a. For each cubic meter of CH waste dispositioned (removed from the TRU inventory of disposed of at WIPP) under Metric 1, a fee of $800 will be earned up to a maximum total of $4,000,000 (approximately 5,000 cubic meters dispositioned). M&O - Waste Isolation Pilot Plant 10/1/12-9/30/17- five-year option to 9/30/22

346

Maximum Constant Boost Control of the Z-Source Inverter  

E-Print Network [OSTI]

Maximum Constant Boost Control of the Z-Source Inverter Miaosen Shen1 , Jin Wang1 , Alan Joseph1 Laboratory Abstract: This paper proposes two maximum constant boost control methods for the Z-source inverter to modulation index is analyzed in detail and verified by simulation and experiment. Keywords- Z-source inverter

Tolbert, Leon M.

347

Acceleration of Maximum Likelihood Estimation for Tomosynthesis Mammography  

E-Print Network [OSTI]

the amount of x-ray radiation exposure to the patients, tomosynthesis uses a lower dose of x-ray than convenAcceleration of Maximum Likelihood Estimation for Tomosynthesis Mammography Juemin Zhang, Waleed twu2@partners.org Abstract Maximum likelihood (ML) estimation is used dur- ing tomosynthesis

Meleis, Waleed

348

Maximum Residual Energy Routing with Reverse Energy Cost  

E-Print Network [OSTI]

node consumes energy, but the receiving node does not. This assumption is not true if acknowledgementsMaximum Residual Energy Routing with Reverse Energy Cost Qiling Xie, Chin-Tau Lea, Mordecai J-The Maximum Residual Energy Path (MREP) routing has been shown an effective routing scheme for energy

Fleischer, Rudolf

349

Maximum Photovoltaic Penetration Levels on Typical Distribution Feeders: Preprint  

SciTech Connect (OSTI)

This paper presents simulation results for a taxonomy of typical distribution feeders with various levels of photovoltaic (PV) penetration. For each of the 16 feeders simulated, the maximum PV penetration that did not result in steady-state voltage or current violation is presented for several PV location scenarios: clustered near the feeder source, clustered near the midpoint of the feeder, clustered near the end of the feeder, randomly located, and evenly distributed. In addition, the maximum level of PV is presented for single, large PV systems at each location. Maximum PV penetration was determined by requiring that feeder voltages stay within ANSI Range A and that feeder currents stay within the ranges determined by overcurrent protection devices. Simulations were run in GridLAB-D using hourly time steps over a year with randomized load profiles based on utility data and typical meteorological year weather data. For 86% of the cases simulated, maximum PV penetration was at least 30% of peak load.

Hoke, A.; Butler, R.; Hambrick, J.; Kroposki, B.

2012-07-01T23:59:59.000Z

350

On the maximum pressure rise rate in boosted HCCI operation  

E-Print Network [OSTI]

This paper explores the combined effects of boosting, intake air temperature, trapped residual gas fraction, and dilution on the Maximum Pressure Rise Rate (MPRR) in a boosted single cylinder gasoline HCCI engine with ...

Wildman, Craig B.

351

Nonstationary analysis of annual maximum streamflow of Canada  

Science Journals Connector (OSTI)

Both natural climate change and anthropogenic impacts may cause nonstationarities in hydrological extremes. In this study, long-term annual maximum streamflow (AMS) records from 145 stations over Canada were used to investigate the nonstationary ...

Xuezhi Tan; Thian Yew Gan

352

Propane spectral resolution enhancement by the maximum entropy method  

Science Journals Connector (OSTI)

The Burg algorithm for maximum entropy power spectral density estimation is applied to a time series of data obtained from a Michelson interferometer and compared with a standard fast...

Bonavito, N L; Yeh, K C; Stewart, K P; Inguva, R; Hurley, E J

1990-01-01T23:59:59.000Z

353

Is there a maximum observable redshift in an open universe?  

E-Print Network [OSTI]

An estimate of the maximum observable redshift is obtained using only t_{0} approximately equal to (14+- 3)10^{9}years, H_{0} approximately equal to 65 +- 10Km\\sec^{-1}Mpc^{-1}(t_{0}H_{0} approximately equal to 0.91 +- 0.08/0.18) assuming \\Lambda approximately equal to 0. The resulting maximum redshift z_{+} approximately equal to 10 appears to give a reasonable upper limit to the highest actually observed redshifts. Some implications are discussed.

J. A. Gonzalo

2000-10-10T23:59:59.000Z

354

Efficiency at maximum power of interacting molecular machines  

E-Print Network [OSTI]

We investigate the efficiency of systems of molecular motors operating at maximum power. We consider two models of kinesin motors on a microtubule: for both the simplified and the detailed model, we find that the many-body exclusion effect enhances the efficiency at maximum power of the many-motor system, with respect to the single motor case. Remarkably, we find that this effect occurs in a limited region of the system parameters, compatible with the biologically relevant range.

N. Golubeva; A. Imparato

2012-10-22T23:59:59.000Z

355

Permission to make digital or hard copies of part or all of this work for personal or classroom use is granted without fee provided that copies are not made or distributed  

E-Print Network [OSTI]

-y gaze movement and manual (keyboard) input to control speed (pitch), altitude, rotation (yaw, mobility, head-mounted displays, augmented or mixed reality systems, video gaming, robotics 1 Introduction to carry heavy loads over long distances, while being controlled remotely by an operator. However, low

MacKenzie, Scott

356

Sweet lake geopressured-geothermal project, Magma Gulf-Technadril/DOE Amoco Fee. Annual report, December 1, 1979-February 27, 1981. Volume I. Drilling and completion test well and disposal well  

SciTech Connect (OSTI)

The Sweet lake site is located approximately 15 miles southeast of Lake Charles in Cameron Parish, Louisiana. A geological study showed that the major structure in this area is a graben. The dip of the beds is northwesterly into the basin. A well drilled into the deep basin would find the target sand below 18,000', at high pressures and temperatures. However, since there is no well control in the basin, the specific site was chosen on the 15,000' contour of the target sand in the eastern, more narrow part of the garben. Those key control wells are present within one mile of the test well. The information acquired by drilling the test well confirmed the earlier geologic study. The target sand was reached at 15,065', had a porosity of over 20% and a permeability to water of 300 md. The original reservoir pressure was 12,060 psi and the bottom hole temperature 299{sup 0}F. There are approximately 250 net feet of sand available for the perforation. The disposal well was drilled to a total depth of 7440'.

Rodgers, R.W. (ed.)

1982-06-01T23:59:59.000Z

357

Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed  

E-Print Network [OSTI]

Database Scalability from Standalone Database Profiling Sameh Elnikety Microsoft Research Cambridge, UK Steven Dropsho Google Inc. Zurich, Switzerland Emmanuel Cecchet University of Massachusetts Amherst, USA external loads that vary with the diurnal cycles and seasonal effects. To the best of our knowledge

Shenoy, Prashant

358

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network [OSTI]

to Protect the Use of Persian-Gulf Oil for Motor Vehicles (to Protect the Use of Persian-Gulf Oil for Motor Vehicles,related to the use of Persian-Gulf oil by MVs B.11

Delucchi, Mark

2005-01-01T23:59:59.000Z

359

Permission to make digital/hard copy of part of all of this work for personal or classroom use is granted without fee provided that the copies are not made or  

E-Print Network [OSTI]

1: Renditions of materials generated using our model: steel teapot with greasy fingerprints (left), teapot with rust forming (right). Closeup pictures in the center. We used a spatially varying texture to interpolate between reflectance models for each point on the teapot. Abstract We present a generative model

O'Brien, James F.

360

Property:Maximum Wave Height(m) | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:Maximum Wave Height(m) Jump to: navigation, search Property Name Maximum Wave Height(m) Property Type String Pages using the property "Maximum Wave Height(m)" Showing 25 pages using this property. (previous 25) (next 25) 1 1.5-ft Wave Flume Facility + 0.2 + 10-ft Wave Flume Facility + 0.5 + 11-ft Wave Flume Facility + 0.4 + 2 2-ft Flume Facility + 0.6 + 3 3-ft Wave Flume Facility + 0.2 + 5 5-ft Wave Flume Facility + 0.5 + 6 6-ft Wave Flume Facility + 0.4 + A Alden Large Flume + 0.0 + Alden Small Flume + 0.2 + Alden Wave Basin + 0.3 + B Breakwater Research Facility + 0.0 + C Carderock Maneuvering & Seakeeping Basin + 0.6 + Carderock Tow Tank 2 + 0.6 + Carderock Tow Tank 3 + 0.6 +

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Efficiency of autonomous soft nano-machines at maximum power  

E-Print Network [OSTI]

We consider nano-sized artificial or biological machines working in steady state enforced by imposing non-equilibrium concentrations of solutes or by applying external forces, torques or electric fields. For unicyclic and strongly coupled multicyclic machines, efficiency at maximum power is not bounded by the linear response value 1/2. For strong driving, it can even approach the thermodynamic limit 1. Quite generally, such machines fall in three different classes characterized, respectively, as "strong and efficient", "strong and inefficient", and "balanced". For weakly coupled multicyclic machines, efficiency at maximum power has lost any universality even in the linear response regime.

Udo Seifert

2010-11-11T23:59:59.000Z

362

Methods of right-of-way acquisition used by the Texas Highway Department  

E-Print Network [OSTI]

the acqui- sition process snd result in the public's receiving the maximum benefit per unit of expenditure. The specific ob)ectives of the study are: To inform the reader of the Texas legal authority to take pri- vate property for highway purposes... of appraisal after assignsmnt. 3. The desirability of the various means of assigning parcels of appraisal ~ 4. The adequacy of msp and other inforsmtion provided the appraiser by the Texas Highway Department. 5. The adequacy of fees paid to appraisers...

Lowry, Paul Russell

2012-06-07T23:59:59.000Z

363

Maximum power tracking control scheme for wind generator systems  

E-Print Network [OSTI]

The purpose of this work is to develop a maximum power tracking control strategy for variable speed wind turbine systems. Modern wind turbine control systems are slow, and they depend on the design parameters of the turbine and use wind and/or rotor...

Mena, Hugo Eduardo

2009-05-15T23:59:59.000Z

364

Maximum power tracking control scheme for wind generator systems  

E-Print Network [OSTI]

The purpose of this work is to develop a maximum power tracking control strategy for variable speed wind turbine systems. Modern wind turbine control systems are slow, and they depend on the design parameters of the turbine and use wind and/or rotor...

Mena Lopez, Hugo Eduardo

2008-10-10T23:59:59.000Z

365

Performance of Civil Aviation Receivers during Maximum Solar Activity Events  

E-Print Network [OSTI]

Performance of Civil Aviation Receivers during Maximum Solar Activity Events Lina DEAMBROGIO on the fields of ionosphere scintillations, solar energetic particles and on the implementation of operational the upcoming period of high solar activity. Emilien ROBERT got his PhD in 2005 and started to work on behalf

Boyer, Edmond

366

Rapidly Solving an Online Sequence of Maximum Flow Problems  

E-Print Network [OSTI]

... an interdictor allocates a finite amount of resources to remove arcs from a net- ... is, the next maximum flow problem in the sequence differs from the previous one by ..... the appropriate reoptimization case and then taking the appropriate action to ..... Our first set of computational experiments tested the performance of our...

2008-02-29T23:59:59.000Z

367

THE MAXIMUM CAPACITY OF A LINE PLAN IS INAPPROXIMABLE  

E-Print Network [OSTI]

THE MAXIMUM CAPACITY OF A LINE PLAN IS INAPPROXIMABLE CHRISTINA PUHL AND SEBASTIAN STILLER Abstract a network, upper arc-capacities and a line pool. E-mail: puhl@math.tu-berlin.de, stiller of the European Commission under contract no. FP6-021235-2. 1 #12;2 CHRISTINA PUHL AND SEBASTIAN STILLER We

Nabben, Reinhard

368

Maximum-principle-satisfying and positivity-preserving high order ...  

E-Print Network [OSTI]

conservation laws: Survey and new developments ..... Notice that in (2.10) we need to evaluate the maximum/minimum of a ..... total energy, p is the pressure, e is the internal energy, and ? > 1 is a constant ... under a standard CFL condition.

2011-04-01T23:59:59.000Z

369

High-Energy Flare Observations from the Solar Maximum Mission  

Science Journals Connector (OSTI)

...research-article High-Energy Flare Observations from the Solar Maximum Mission W...Vestrand We review high-energy observations of solar flares with emphasis...expectation, high-energy emission is a common property of solar flares. Direct interpretation...

1991-01-01T23:59:59.000Z

370

Maximum Entropy in Support of Semantically Annotated Datasets  

E-Print Network [OSTI]

Maximum Entropy in Support of Semantically Annotated Datasets Paulo Pinheiro da Silva, Vladik whether two datasets describe the same quantity. The existing solution to this problem is to use these datasets' ontologies to deduce that these datasets indeed represent the same quantity. However, even when

Kreinovich, Vladik

371

O(1)-Approximations for Maximum Movement Piotr Berman1  

E-Print Network [OSTI]

movement of the pebbles, motivated by minimizing either execution time or energy usage. Spe- cific problems the maximum movement made by pebbles on a graph to reach a configuration in which the pebbles form a connected. For example, in the connectivity goal, the proximity of the robots should form a connected graph. Two

Demaine, Erik

372

Maximization of Recursive Utilities: A Dynamic Maximum Principle Approach  

E-Print Network [OSTI]

Maximization of Recursive Utilities: A Dynamic Maximum Principle Approach Wahid FAIDI LAMSIN, ENIT for a class of robust utility function introduced in Bordigoni, Matoussi et Schweizer (2005). Our method-investment strategy which is characterized as the unique solution of a forward-backward system. Key words : Utility

Di Girolami, Cristina

373

Maximum stellar mass versus cluster membership number revisited  

E-Print Network [OSTI]

We have made a new compilation of observations of maximum stellar mass versus cluster membership number from the literature, which we analyse for consistency with the predictions of a simple random drawing hypothesis for stellar mass selection in clusters. Previously, Weidner and Kroupa have suggested that the maximum stellar mass is lower, in low mass clusters, than would be expected on the basis of random drawing, and have pointed out that this could have important implications for steepening the integrated initial mass function of the Galaxy (the IGIMF) at high masses. Our compilation demonstrates how the observed distribution in the plane of maximum stellar mass versus membership number is affected by the method of target selection; in particular, rather low n clusters with large maximum stellar masses are abundant in observational datasets that specifically seek clusters in the environs of high mass stars. Although we do not consider our compilation to be either complete or unbiased, we discuss the method by which such data should be statistically analysed. Our very provisional conclusion is that the data is not indicating any striking deviation from the expectations of random drawing.

Th. Maschberger; C. J. Clarke

2008-08-29T23:59:59.000Z

374

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint  

E-Print Network [OSTI]

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint Zhe Wang Electrical--In this paper, we develop efficient algorithm to obtain the optimal energy schedule for fading channel with energy harvesting. We assume that the side information of both the channel states and energy harvesting

Greenberg, Albert

375

Property:Maximum Velocity(m/s) | Open Energy Information  

Open Energy Info (EERE)

Velocity(m/s) Velocity(m/s) Jump to: navigation, search Property Name Maximum Velocity(m/s) Property Type String Pages using the property "Maximum Velocity(m/s)" Showing 25 pages using this property. (previous 25) (next 25) A Alden Large Flume + 0.9 + B Bucknell Hydraulic Flume + 2.7 + C Carderock Maneuvering & Seakeeping Basin + 7.2 + Carderock Rotating Arm Tow Tank + 25.8 + Carderock Tow Tank 1 + 9.3 + Carderock Tow Tank 2 + 10.3 + Carderock Tow Tank 3 + 25.8 + Chase Tow Tank + 2.5 + D Davidson Laboratory Tow Tank + 18.3 + H Haynes Tow Tank + 1.8 + I Ice Towing Tank + 0.5 + L Lakefront Tow Tank + 2.7 + M MHL Free Surface Channel + 2 + MHL High Speed Cavitation + 25.9 + MHL Tow Tank + 6.7 + MIT Tow Tank + 1.5 + MMA Tugboat/ Barge/ Vessel + 5.1 + Maine Tow Tank + 3 +

376

Radiative muon capture rates and the maximum photon energy  

Science Journals Connector (OSTI)

The differential photon spectrum for radiative muon capture is expanded about the average maximum photon energy km and the correction terms evaluated using for one a modified Thomas-Reiche-Kuhn sum rule, thus extending previous work for ordinary capture. The resulting rate is much less dependent on km than the usual closure result. The ratio km? appropriate for closure calculations, with ? the average neutrino energy, is determined and found to be approximately constant and, when correction terms are included, somewhat higher than values previously used. By similar techniques a consistency relation is derived which can be solved to explicitly estimate "physical" values of km and ?.NUCLEAR REACTIONS Radiative muon capture. Differential photon spectrum, relative rate for Ca40. Dipole sum rules used to correct closure approximation, obtain estimates of mean excitation energy, average maximum photon energy.

R. S. Sloboda and Harold W. Fearing

1978-11-01T23:59:59.000Z

377

When are microcircuits well-modeled by maximum entropy methods?  

E-Print Network [OSTI]

and fire. The inputs are chosen from distributions that are either gaussian, uniform, skewed, or bimodal. For each circuit, we compute the distribution on output spiking states either analytically or by sampling, approximate by a maximum entropy fit... generation is characterized by a simple static nonlinearity, or by integrate-and-fire (LIF) threshold-crossing dynamics. However, this circuit does generate substantial higher-order correlations if the common input to the three cells is bimodal. This approach...

2010-07-20T23:59:59.000Z

378

Maximum entanglement in squeezed boson and fermion states  

SciTech Connect (OSTI)

A class of squeezed boson and fermion states is studied with particular emphasis on the nature of entanglement. We first investigate the case of bosons, considering two-mode squeezed states. Then we construct the fermion version to show that such states are maximum entangled, for both bosons and fermions. To achieve these results, we demonstrate some relations involving squeezed boson states. The generalization to the case of fermions is made by using Grassmann variables.

Khanna, F. C. [Theoretical Physics Institute, University of Alberta, Edmonton, Alberta T6G 2J1 (Canada); TRIUMF, Vancouver, British Columbia V6T 2A3 (Canada); Malbouisson, J. M. C. [Instituto de Fisica, Universidade Federal da Bahia, 40210-340, Salvador, BA (Brazil); Theoretical Physics Institute, University of Alberta, Edmonton, Alberta T6G 2J1 (Canada); Santana, A. E. [Instituto de Fisica, Universidade de Brasilia, 70910-900, Brasilia, DF (Brazil); Theoretical Physics Institute, University of Alberta, Edmonton, Alberta T6G 2J1 (Canada); Santos, E. S. [Centro Federal de Educacao Tecnologica da Bahia, 40030-010, Salvador, BA (Brazil)

2007-08-15T23:59:59.000Z

379

Maximum Entry and Mandatory Separation Ages for Certain Security Employees  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The policy establishes the DOE policy on maximum entry and mandatory separation ages for primary or secondary positions covered under special statutory retirement provisions and for those employees whose primary duties are the protection of officials of the United States against threats to personal safety or the investigation, apprehension, and detention of individuals suspected or convicted of offenses against the criminal laws of the United States. Admin Chg 1, dated 12-1-11, cancels DOE P 310.1.

2001-10-11T23:59:59.000Z

380

The Maximum Patch Method for Directional Dark Matter Detection  

E-Print Network [OSTI]

Present and planned dark matter detection experiments search for WIMP-induced nuclear recoils in poorly known background conditions. In this environment, the maximum gap statistical method provides a way of setting more sensitive cross section upper limits by incorporating known signal information. We give a recipe for the numerical calculation of upper limits for planned directional dark matter detection experiments, that will measure both recoil energy and angle, based on the gaps between events in two-dimensional phase space.

Shawn Henderson; Jocelyn Monroe; Peter Fisher

2008-01-10T23:59:59.000Z

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Maximum patch method for directional dark matter detection  

SciTech Connect (OSTI)

Present and planned dark matter detection experiments search for WIMP-induced nuclear recoils in poorly known background conditions. In this environment, the maximum gap statistical method provides a way of setting more sensitive cross section upper limits by incorporating known signal information. We give a recipe for the numerical calculation of upper limits for planned directional dark matter detection experiments, that will measure both recoil energy and angle, based on the gaps between events in two-dimensional phase space.

Henderson, Shawn; Monroe, Jocelyn; Fisher, Peter [Department of Physics, Massachusetts Institute of Technology, Cambridge, Massachusetts 02139 (United States); Laboratory for Nuclear Science, MIT Kavli Institute for Astrophysics and Space Research, Department of Physics, Massachusetts Institute of Technology, Cambridge, Massachusetts 02139 (United States)

2008-07-01T23:59:59.000Z

382

Maximum entropy method for reconstruction of the CMB images  

E-Print Network [OSTI]

We propose a new approach for the accurate reconstruction of cosmic microwave background distributions from observations containing in addition to the primary fluctuations the radiation from unresolved extragalactic point sources and pixel noise. The approach uses some effective realizations of the well-known maximum entropy method and principally takes into account {\\it a priori} information about finiteness and spherical symmetry of the power spectrum of the CMB satisfying the Gaussian statistics.

A. T. Bajkova

2002-05-21T23:59:59.000Z

383

Property:Maximum Wave Length(m) | Open Energy Information  

Open Energy Info (EERE)

Wave Length(m) Wave Length(m) Jump to: navigation, search Property Name Maximum Wave Length(m) Property Type String Pages using the property "Maximum Wave Length(m)" Showing 18 pages using this property. A Alden Small Flume + Variable + Alden Wave Basin + 1.8 + C Carderock Maneuvering & Seakeeping Basin + 12.2 + Carderock Tow Tank 2 + 12.2 + Carderock Tow Tank 3 + 12.2 + D Davidson Laboratory Tow Tank + 15.2 + DeFrees Large Wave Basin + 64 + DeFrees Small Wave Basin + 30 + H Haynes Wave Basin + 10.7 + L Lakefront Tow Tank + 22 + M MIT Tow Tank + 4.6 + O OTRC Wave Basin + 25 + Ohmsett Tow Tank + 18 + R Richmond Field Station Tow Tank + 2 + S SAFL Channel + 6.6 + Sandia Lake Facility + 4.57 + Sheets Wave Basin + 10 + Ship Towing Tank + 6 + Retrieved from "http://en.openei.org/w/index.php?title=Property:Maximum_Wave_Length(m)&oldid=597351

384

IEP - Water-Energy Interface: Total Maximum Daily Load Page  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Total Maximum Daily Loads (TMDLs) Total Maximum Daily Loads (TMDLs) The overall goal of the Clean Water Act is to "restore and maintain the chemical, physical, and biological integrity of the Nation’s waters." In 1999, EPA proposed changes to Section 303(d), to establish Total Maximum Daily Loads (TMDLs) for watersheds that do not meet this goal. The TMDL is the highest amount of a given pollutant that is permissible in that body of water over a given period of time. TMDLs include both waste load allocation (WLA) for point sources and load allocations for non-point sources. In Appalachia, acid mine drainage (AMD) is the single most damaging non-point source. There is also particular concern of the atmospheric deposition of airborne sulfur, nitrogen, and mercury compounds. States are currently in the process of developing comprehensive lists of impaired waters and establishing TMDLs for those waters. EPA has recently proposed a final rule that will require states to develop TMDLs and implement plans for improving water quality within the next 10 years. Under the new rule, TMDL credits could be traded within a watershed.

385

Audit Report: ER-B-99-05 | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 Audit Report: ER-B-99-05 April 8, 1999 Westinghouse Savannah River Company's Withdrawal of Fees As the operator of the Department's Savannah River Site, Westinghouse Savannah River Company (Westinghouse) receives three types of fees: (1) award fees commensurate with the overall performance rating, (2) Performance Based Incentive (PBI) fees for achieving measurable goals or defined tasks as specified in annual operating plans, and (3) Cost Reduction Incentive Program (CRIP) fees for making improvements in site operations that reduce total contract costs. The Department's Contracting Officer notifies Westinghouse when fees are earned, and Westinghouse withdraws the authorized amounts from the Department's letter-of-credit account. The audit objective was to determine whether Westinghouse withdrew

386

DOE Completes Annual Determination of the Adequacy of the Nuclear Waste  

Broader source: Energy.gov (indexed) [DOE]

Completes Annual Determination of the Adequacy of the Nuclear Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee DOE Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee November 2, 2010 - 7:41pm Addthis As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Office of Standard Contract Management has determined that there is no basis to propose an adjustment to the fee to Congress. The Secretary of Energy has adopted and approved this determination. As a result, the fee will remain at the amount specified in the NWPA pending the next annual review. The Secretary's determination is available here. Addthis Related Articles GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions

387

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61 - 2370 of 31,917 results. 61 - 2370 of 31,917 results. Rebate City of Santa Monica- Building Permit Fee Waiver for Solar Projects In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff... http://energy.gov/savings/city-santa-monica-building-permit-fee-waiver-solar-projects Rebate Local Option- Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) As of July 2011, Connecticut authorizes municipalities to pass a local ordinance to exempt "Class I" renewable energy projects from paying building permit fees. Class I renewable energy projects... http://energy.gov/savings/local-option-building-permit-fee-waivers-renewable-energy-projects-connecticut

388

Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Plug-In Electric Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions to someone by E-mail Share Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions on Facebook Tweet about Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions on Twitter Bookmark Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions on Google Bookmark Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions on Delicious Rank Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions on Digg

389

AppendixI_SRG _staff_  

Broader source: Energy.gov (indexed) [DOE]

I I State Fees I. Introduction Twenty-eight 1 states levy some type of fee on shipments of radioactive material in order to fund services such as preparing emergency responders and inspecting radioactive materials shipments. The fees range from twenty-five dollars to forty-five hundred dollars for the initial rail cask. The question for the Department of Energy is how should DOE handle state fees in the context of the Section 180(c) program. The 1998 Draft Policy on Section 180(c) did not address this issue. State fees raise two questions for the Department. Would the Department be paying twice for some activities if it pays state fees and funds the state through 180(c)? And, if so, what can the Department do to meet its obligations under Section 180(c), comply with

390

Microsoft PowerPoint - changeorders  

Broader source: Energy.gov (indexed) [DOE]

Negotiation of Incentives on Negotiation of Incentives on Existing Contracts * Incentives/performance fee should be negotiated prospectively * Incentive fees should not be established on: * Incurred costs * Past delivery dates * Or other milestones which have been achieved prior to negotiation of the fee Changes/REAs * Contract changes can only be issued by contracting officers * FAR 43.201 (a) requires changes be issued by contract modification * Contracting Officers should negotiate changes/REAs in a timely manner * Change Control Boards * Need to keep contracts current in order to maintain the effectiveness of incentives and to hold contractors accountable Fee On Existing Contracts * Fee may be paid on negotiated change orders and REAs with entitlement * Fee should not be added to the contract merely

391

Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Plug-In Electric Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study to someone by E-mail Share Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study on Facebook Tweet about Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study on Twitter Bookmark Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study on Google Bookmark Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study on Delicious Rank Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study on Digg

392

Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Plug-in Electric Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees to someone by E-mail Share Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees on Facebook Tweet about Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees on Twitter Bookmark Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees on Google Bookmark Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees on Delicious Rank Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees on Digg

393

Maximum likelihood reconstruction for the Daya Bay Experiment  

E-Print Network [OSTI]

The Daya Bay Reactor Neutrino experiment is designed to precisely determine the neutrino mixing angle theta13. In this paper, we report a maximum likelihood (ML) method to reconstruct the vertex and energy of events in the anti-neutrino detector, based on a simplified optical model that describes light propagation. We calibrate the key paramters of the optical model with Co60 source, by comparing the predicted charges of the PMTs with the observed charges. With the optimized parameters, the resolution of the vertex reconstruction is about 25cm for Co60 gamma.

Xia Dongmei

2014-03-07T23:59:59.000Z

394

Solar and Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

Permitting Standards Permitting Standards Jump to: navigation, search Permitting standards can facilitate the installation of wind and solar energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] Contents 1 Solar/Wind Permitting Standards Incentives 2 References Solar/Wind Permitting Standards Incentives

395

Clallam County PUD - Residential and Small Business Solar Loan Program |  

Broader source: Energy.gov (indexed) [DOE]

Clallam County PUD - Residential and Small Business Solar Loan Clallam County PUD - Residential and Small Business Solar Loan Program Clallam County PUD - Residential and Small Business Solar Loan Program < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Maximum Rebate $15,000 Program Info State District of Columbia Program Type Utility Loan Program Rebate Amount $1,000 - $15,000 Provider PUD #1 of Clallam County In conjunction with First Federal Savings and Loan, Clallam County PUD offers residential and small commercial customers a low-interest loan program for the purchase of solar photovoltaic systems. There is no application fee and Clallam County PUD covers the loan fee. A list of [http://www.clallampud.net/conservation/res_Eligible_Measures.asp eligible measures] for the loan program is located on the program website. Loans are

396

TABLE OF CONTENTS  

National Nuclear Security Administration (NNSA)

AC05-00OR22800 AC05-00OR22800 TABLE OF CONTENTS Contents Page # TOC - i SECTION A - SOLICITATION/OFFER AND AWARD ......................................................................... A-i SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS ........................................................ B-i B.1 SERVICES BEING ACQUIRED ....................................................................................B-2 B.2 TRANSITION COST, ESTIMATED COST, MAXIMUM AVAILABLE FEE, AND AVAILABLE FEE (Modification 295, 290, 284, 280, 270, 257, 239, 238, 219, M201, M180, M162, M153, M150, M141, M132, M103, M092, M080, M055, M051, M049, M034, M022, M003, A002) ..........................................................B-2 SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT DESCRIPTION OF

397

Solar/Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

Permitting Standards Permitting Standards < Solar Jump to: navigation, search Permitting standards can facilitate the installation of wind and solar energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] Solar/Wind Permitting Standards Incentives CSV (rows 1 - 55) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active

398

Siting & Permitting | Open Energy Information  

Open Energy Info (EERE)

Siting & Permitting Siting & Permitting Jump to: navigation, search Siting and permitting policies can facilitate the installation of clean energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar projects. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] References ↑ DSIRE Glossary Retrieved from "http://en.openei.org/w/index.php?title=Siting_%26_Permitting&oldid=538321"

399

Location of Maximum Credible Beam Losses in LCLS Injector  

SciTech Connect (OSTI)

The memo describes the maximum credible beam the LCLS injector can produce and lose at various locations along the beamline. The estimation procedure is based upon three previous reports [1, 2, 3]. While specific numbers have been updated to accurately reflect the present design parameters, the conclusions are very similar to those given in Ref 1. The source of the maximum credible beam results from the explosive electron emission from the photocathode if the drive laser intensity exceeds the threshold for plasma production. In this event, the gun's RF field can extract a large number of electrons from this plasma which are accelerated out of the gun and into the beamline. This electron emission persists until it has depleted the gun of all its energy. Hence the number of electrons emitted per pulse is limited by the amount of stored RF energy in the gun. It needs to be emphasized that this type of emission is highly undesirable, as it causes permanent damage to the cathode.

Mao, Stan

2010-12-13T23:59:59.000Z

400

Ionization and maximum energy of nuclei in shock acceleration theory  

E-Print Network [OSTI]

We study the acceleration of heavy nuclei at SNR shocks when the process of ionization is taken into account. Heavy atoms ($Z_N >$ few) in the interstellar medium which start the diffusive shock acceleration (DSA) are never fully ionized at the moment of injection. The ionization occurs during the acceleration process, when atoms already move relativistically. For typical environment around SNRs the photo-ionization due to the background galactic radiation dominates over Coulomb collisions. The main consequence of ionization is the reduction of the maximum energy which ions can achieve with respect to the standard result of the DSA. In fact the photo-ionization has a timescale comparable to the beginning of the Sedov-Taylor phase, hence the maximum energy is no more proportional to the nuclear charge, as predicted by standard DSA, but rather to the effective ions' charge during the acceleration process, which is smaller than the total nuclear charge $Z_N$. This result can have a direct consequence in the pred...

Morlino, Giovanni

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

TO: FILE FRml: J&-q Ma  

Office of Legacy Management (LM)

DisposalStorage TYPE EIF CONTRACT --------- 0 Prime' 0 Other information (i.e., cost q Subcontract& + fixed fee, unit price, 0 Purchase Order time & material, Eftc:)...

402

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

individual produces each year are exempt from the motor vehicle fuel excise tax, the petroleum inspection fee, and any petroleum inspection requirements not required under federal...

403

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Ethanol License Anyone who imports, exports, or supplies ethanol in the state of Wyoming must obtain an annual license from the Wyoming Department of Transportation. The fee for...

404

Catawba County- Green Construction Permitting Incentive Program  

Broader source: Energy.gov [DOE]

Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

405

CX-006910: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

and conservation strategy (ongoing), 2) development and implementation of a permit fee rebate program to encourage residential energy efficiency retrofitting, 3) installation of a...

406

U.S. Department of Energy NEPA Categorical Exclusion Determination...  

Broader source: Energy.gov (indexed) [DOE]

and conservation strategy (ongoing), 2) development and implementation of a permit fee rebate program to encourage residential energy efficiency retrofitting, 3) installation of a...

407

News Archive | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and network reliability issues. Last week, the Department of Commerce's National Telecommunications and Information Adm December 13, 2010 Federal Court Dismisses Waste Fee...

408

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Compressed Natural Gas (CNG) Deregulation The Virginia State Corporation Commission may refrain from regulating and setting rates, charges, and fees for retail CNG service provided...

409

Tax Credits, Rebates & Savings | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Projects In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers,...

410

Participant Obligations | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

the duration of the research award. The awardee and their primary graduate thesis advisor are responsible for any tuition or fees that are required by the graduate institution...

411

Columbia University Biotechnology Association  

E-Print Network [OSTI]

Columbia University Biotechnology Association Biotechnology Career Conference Friday, April 20th for members, Non-members fee $10 Sponsored by Columbia University GSAC and MA Biotechnology Program, Dept

Tong, Liang

412

E-Print Network 3.0 - added 177lu radioisotope Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(TLD) SERVICE Summary: .B. The National Dosimetry Service charges additional fees for ad hoc dosimeter requests. Please allow a minimum... Left Ring Right...

413

E-Print Network 3.0 - applications thermoluminescent dosimeter...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

This information... .B. The National Dosimetry Service charges additional fees for ad hoc dosimeter ... Source: Seldin, Jonathan P. - Department of Mathematics and Computer...

414

E-Print Network 3.0 - auditing citizen engagement Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Audit Committee shall recommend for Board approval the engagement and related fees of the independent... . Engagements not requiring approval by the Board shall be reported to the...

415

Rules and Regulations for the Disposal of Low-Level Radioactive Waste (Nebraska)  

Broader source: Energy.gov [DOE]

These regulations, promulgated by the Department of Environmental Quality, contain provisions pertaining to the disposal of low-level radioactive waste, disposal facilities, and applicable fees.

416

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees PEVs and HEVs are registered biennially, with the exception of new vehicles for which new...

417

RAPID/Roadmap/18-AK-a | Open Energy Information  

Open Energy Info (EERE)

&& Underground Storage Facility Regulations Alaska Stat. 46.03.380 - Registration of Tanks and Tank Systems Alaska Stat. 46.03.385 - Registration Fee for Tanks and Tank...

418

U.S. Department of Energy Provides Report to Congress on the...  

Energy Savers [EERE]

of Energy Releases Revised Total System Life Cycle Cost Estimate and Fee Adequacy Report for Yucca Mountain Project Department of Energy Selects Recipients of GNEP Siting Grants...

419

Microsoft Word - CX_Memo_LSN-JDay.docx  

Broader source: Energy.gov (indexed) [DOE]

to allow Lightspeed Networks, Inc. (LSN) to install fiber optic cable on existing BPA fee-owned property adjacent to BPA's John Day Substation. LSN would install...

420

E-Print Network 3.0 - aptima combo2 assay Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Industrial and Systems Engineering, North Carolina State University Collection: Engineering 2 STUDENT HEALTH SERVICES MOST COMMON LAB FEES Summary: ChlamydiaGC Aptima...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

E-Print Network 3.0 - adult psychiatric inpatients Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: adult psychiatric patients and physicians who work in an inpatient hospital setting. Registration Fee... to the other disciplines of medicine and surgery Assess...

422

Resource Repletion , Role of Buildings  

Science Journals Connector (OSTI)

For example, cleaner indoor air enhances productivity; recycling water reduces water fees; building integrated photovoltaics can be less expensive than other claddings...

Dr. Katja Hansen; Dr. Michael Braungart

2013-01-01T23:59:59.000Z

423

Resource Repletion , Role of Buildings  

Science Journals Connector (OSTI)

For example, cleaner indoor air enhances productivity; recycling water reduces water fees; building integrated photovoltaics can be less expensive than other claddings...

Dr. Katja Hansen; Dr. Michael Braungart

2012-01-01T23:59:59.000Z

424

Patents and Innovation: Friends or Foes?  

E-Print Network [OSTI]

Sen, D. (2005) Fee versus Royalty Reconsidered Games andinvention, the higher the royalties the patent holder cansequencing) and to create royalty stacking (e.g. , the MPEG-

Lvque, Franois

2007-01-01T23:59:59.000Z

425

Non-exclusive License: AGMT-XXXX U.S. DEPARTMENT OF ENERGY NATIONAL...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to make the benefits of the invention reasonably accessible to the public. 7. ROYALTY PROVISIONS: LICENSEE agrees to pay to LICENSOR: a. An initial fee of TBD, payable...

426

Rights and Duties of Mines and Mine Owners, General (Missouri)  

Broader source: Energy.gov [DOE]

This legislation addresses general operational guidelines for mine owners regarding public notices, fees, land and mineral ownership, requirements for mining in certain municipalities, and mining...

427

Crowd-Powered Experts Helping Surgeons Interpret Breast Cancer Images  

E-Print Network [OSTI]

permission and/or a fee. Request permissions from Permissions@acm.org. GamifIR '14, April 13 2014, Amsterdam

428

Environmental Quality: Air (Louisiana)  

Broader source: Energy.gov [DOE]

The Department of Environmental Quality regulates air quality in Louisiana. The Department has an established a fee system for funding the monitoring, investigation and other activities required...

429

MEMORANDUM TO: FILE DATE-  

Office of Legacy Management (LM)

Governme Other fJ q Other infor + fixed fee time & mate ContractPurchase Order CONTRACTING PERIOD: ---- --:q: ----- --- OWNERSHiP:...

430

G  

Office of Environmental Management (EM)

or canceled. Who Is the Intended Audience For this AL? Department of Energy (DOE) Contracting Officers who are considering providing for provisional payment of fee under their...

431

Slide24 | OSTI, US Dept of Energy, Office of Scientific and Technical...  

Office of Scientific and Technical Information (OSTI)

(related to national energy R&D expenditures relative to other member countries). * Contracting party has right to determine ETDEWEB access policies and any fees within its...

432

RAPID/Roadmap/14-OR-b | Open Energy Information  

Open Energy Info (EERE)

Fee, Land Use Compatibility Statement Application 1200-A is appropriate for industrial operations with a gravel component. There are several industrial permits available....

433

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Installation of Alternative Fuel Components in Vehicles A propane or compressed natural gas (CNG) carburetion system installer who collects an installation service fee must hold an...

434

2015 DOE Safety and Security Enforcement Workshop | Department...  

Energy Savers [EERE]

Workshop 2015 DOE Safety and Security Enforcement Workshop WHEN: May 5 and 6, 2015 (EFCOG Meeting on May 7) WHERE: Nevada Support Facility Nevada Field Office REGISTRATION FEE:...

435

Microsoft Word - AcqGuide70pt15rev9.doc  

Energy Savers [EERE]

outcomes for which DOE negotiated. Rollover of Performance Fee Some performance evaluation and measurement plans contemplate the rollover of unearned performance...

436

2015 DOE Acquisition and Project Management Workshop  

Broader source: Energy.gov [DOE]

Tuition Cost:There is no registration fee, but attendees organizations are responsible for travel, food, and lodging expenses if the attendee is on TDY.

437

E-Print Network 3.0 - advanced pathological stage Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

pathological stage Search Powered by Explorit Topic List Advanced Search Sample search results for: advanced pathological stage Page: << < 1 2 3 4 5 > >> 1 REGISTRATION Course Fees...

438

SECTION B  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

November 7, 2013 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP) 1 OCTOBER 2013 THROUGH 30 SEPTEMBER 2014 CONTRACT DE-EM0001971 I. INTRODUCTION This...

439

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

plug-in electric vehicles, and vehicles that operate on natural gas, propane, hydrogen, or other special fuels. For more information on fees and eligibility for the AFV...

440

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Hydrogen Fueling Infrastructure Permitting and Safety Individuals or entities must submit an application and pay a 10 fee to the State Fire Marshall or a certified designee before...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Freedom of Information Act FOIA 10CFR  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

attorney fees and other litigation costs reasonably incurred in any case under this section in which the complainant has substantially prevailed. (F) Whenever the court...

442

PEMP General Information  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

if the Contractor fails to meet DOE's expectation. D. Contractor Self-Assessment See Section B Clause B.7 Award Fee Administration, which states: "Following each evaluation...

443

Future QAs_maybe with final RFP  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

expect. Is the NNSA anticipating the payment of full performance fee over the entire ten year contract period, regardless of the amount and evolution of shared savings...

444

Self-Funded Public Facilities Energy Retrofit Programs | Department...  

Energy Savers [EERE]

facilities (e.g., state buildings, municipal buildings, school districts, water and wastewater treatment facilities, street lighting, etc.). A fee-for-service program can be used...

445

Audit Report: IG-0390 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0 Audit Report: IG-0390 May 8, 1996 Department of Energy Management and Operating Contractor Available Fees Audit Report: IG-0390 More Documents & Publications Audit Report:...

446

E-Print Network 3.0 - alto cuilo concession Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

within the ... Source: Australian National University, Department of Engineering, Solar Energy Program Collection: Renewable Energy ; Engineering 2 Page 1 of 1 Fees &...

447

Alternative Fuels Data Center  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Registration Fee Program (Program) provides funding for projects that reduce air pollution from on- and off-road vehicles. Eligible projects include purchasing AFVs...

448

Solar Powering Your Community: A Guide for Local Governments...  

Broader source: Energy.gov (indexed) [DOE]

or any agency thereof. Free download available at www.solaramericacommunities.energy.gov Available electronically at www.osti.govbridge Available for a processing fee to...

449

E-Print Network 3.0 - aid agreements essential Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collection: Environmental Sciences and Ecology 13 LSU Account Structure Subsidiary Ledger Accounts Summary: technology fee funds 3 Restricted federal appropriations 4...

450

Montana Water Quality Permit Application, Nondegradation Authorization...  

Open Energy Info (EERE)

LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Montana Water Quality Permit Application, Nondegradation Authorization, and Permit FeesPermitting...

451

You Must Include: Fin/Grad Aid Verification  

E-Print Network [OSTI]

Charges only AMOUNT DEFERRED $0.00 PAYMENT SCHEDULE (2/3 of Summer Session Fees plus Housing) JUL 15th

Liebling, Michael

452

Nevada Procedures for Filing Application for a Water Right |...  

Open Energy Info (EERE)

Rights, Making Application for a Water Right and a Summary of Fees of the State Engineer. Retrieved from "http:en.openei.orgwindex.php?titleNevadaProceduresforFiling...

453

BPA-2011-01724-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Bonneville's actions on species listed under the Endangered Species Act and wetlands. I request a waiver or reduction of fees because the discolsure is "likely to...

454

Boiler Maximum Achievable Control Technology (MACT) Technical Assistance- Fact Sheet, May 2014  

Broader source: Energy.gov [DOE]

Fact sheet about the Boiler Maximum Achievable Control Technology (MACT) Technical Assistance Program

455

Diffusion maximum as a function of size in dense liquids  

Science Journals Connector (OSTI)

We study the diffusion of small guest particles of different sizes in a host fluid at liquid densities using molecular dynamics simulations. We observe an enhancement of the diffusivity of guest particles for a size related to the structure of the void space of the host fluid, analogous to the levitation effect observed for guest diffusion in porous solids. Friction and activation energy are found to be minimum for the guest size with maximum self-diffusivity. Wavelength dependent self-diffusivity indicates a monotonic and oscillatory dependence on wave number k for anomalous and linear regimes, respectively. These are associated with single and bi-exponential decay of the incoherent intermediate scattering function.

Pradip Kr. Ghorai; A. V. Anil Kumar; Srikanth Sastry; S. Yashonath

2005-09-16T23:59:59.000Z

456

Maximum-Likelihood Continuity Mapping (MALCOM): An Alternative to HMMs  

SciTech Connect (OSTI)

The authors describe Maximum-Likelihood Continuity Mapping (MALCOM) as an alternative to hidden Markov models (HMMs) for processing sequence data such as speech. While HMMs have a discrete ''hidden'' space constrained by a fixed finite-automata architecture, MALCOM has a continuous hidden space (a continuity map) that is constrained only by a smoothness requirement on paths through the space. MALCOM fits into the same probabilistic framework for speech recognition as HMMs, but it represents a far more realistic model of the speech production process. The authors support this claim by generating continuity maps for three speakers and using the resulting MALCOM paths to predict measured speech articulator data. The correlations between the MALCOM paths (obtained from only the speech acoustics) and the actual articulator movements average 0.77 on an independent test set not used to train MALCOM nor the predictor. On average, this unsupervised model achieves 92% of performance obtained using the corresponding supervised method.

Nix, D.A.; Hogden, J.E.

1998-12-01T23:59:59.000Z

457

Maximum Entropy Principle and the Higgs boson mass  

Science Journals Connector (OSTI)

Abstract A successful connection between Higgs boson decays and the Maximum Entropy Principle is presented. Based on the information theory inference approach we determine the Higgs boson mass as M H = 125.04 0.25 GeV , a value fully compatible to the LHC measurement. This is straightforwardly obtained by taking the Higgs boson branching ratios as the target probability distributions of the inference, without any extra assumptions beyond the Standard Model. Yet, the principle can be a powerful tool in the construction of any model affecting the Higgs sector. We give, as an example, the case where the Higgs boson has an extra invisible decay channel within a Higgs portal model.

Alexandre Alves; Alex G. Dias; Roberto da Silva

2014-01-01T23:59:59.000Z

458

Reduction in maximum time uncertainty of paired time signals  

DOE Patents [OSTI]

Reduction in the maximum time uncertainty (t/sub max/ - t/sub min/) of a series of paired time signals t/sub 1/ and t/sub 2/ varying between two input terminals and representative of a series of single events where t/sub 1/ less than or equal to t/sub 2/ and t/sub 1/ + t/sub 2/ equals a constant, is carried out with a circuit utilizing a combination of OR and AND gates as signal selecting means and one or more time delays to increase the minimum value (t/sub min/) of the first signal t/sub 1/ closer to t/sub max/ and thereby reduce the difference. The circuit may utilize a plurality of stages to reduce the uncertainty by factors of 20 to 800.

Theodosiou, G.E.; Dawson, J.W.

1981-02-11T23:59:59.000Z

459

Maximum Likelihood Analysis of Low Energy CDMS II Germanium Data  

E-Print Network [OSTI]

We report on the results of a search for a Weakly Interacting Massive Particle (WIMP) signal in low-energy data of the Cryogenic Dark Matter Search (CDMS~II) experiment using a maximum likelihood analysis. A background model is constructed using GEANT4 to simulate the surface-event background from $^{210}$Pb decay-chain events, while using independent calibration data to model the gamma background. Fitting this background model to the data results in no statistically significant WIMP component. In addition, we perform fits using an analytic ad hoc background model proposed by Collar and Fields, who claimed to find a large excess of signal-like events in our data. We confirm the strong preference for a signal hypothesis in their analysis under these assumptions, but excesses are observed in both single- and multiple-scatter events, which implies the signal is not caused by WIMPs, but rather reflects the inadequacy of their background model.

Agnese, R; Balakishiyeva, D; Thakur, R Basu; Bauer, D A; Billard, J; Borgland, A; Bowles, M A; Brandt, D; Brink, P L; Bunker, R; Cabrera, B; Caldwell, D O; Cerdeno, D G; Chagani, H; Chen, Y; Cooley, J; Cornell, B; Crewdson, C H; Cushman, P; Daal, M; Di Stefano, P C F; Doughty, T; Esteban, L; Fallows, S; Figueroa-Feliciano, E; Fritts, M; Godfrey, G L; Golwala, S R; Graham, M; Hall, J; Harris, H R; Hertel, S A; Hofer, T; Holmgren, D; Hsu, L; Huber, M E; Jastram, A; Kamaev, O; Kara, B; Kelsey, M H; Kennedy, A; Kiveni, M; Koch, K; Leder, A; Loer, B; Asamar, E Lopez; Mahapatra, R; Mandic, V; Martinez, C; McCarthy, K A; Mirabolfathi, N; Moffatt, R A; Moore, D C; Nelson, R H; Oser, S M; Page, K; Page, W A; Partridge, R; Pepin, M; Phipps, A; Prasad, K; Pyle, M; Qiu, H; Rau, W; Redl, P; Reisetter, A; Ricci, Y; Rogers, H E; Saab, T; Sadoulet, B; Sander, J; Schneck, K; Schnee, R W; Scorza, S; Serfass, B; Shank, B; Speller, D; Upadhyayula, S; Villano, A N; Welliver, B; Wright, D H; Yellin, S; Yen, J J; Young, B A; Zhang, J

2014-01-01T23:59:59.000Z

460

Probable maximum flood control; Yucca Mountain Site Characterization Project  

SciTech Connect (OSTI)

This study proposes preliminary design concepts to protect the waste-handling facilities and all shaft and ramp entries to the underground from the probable maximum flood (PMF) in the current design configuration for the proposed Nevada Nuclear Waste Storage Investigation (NNWSI) repository protection provisions were furnished by the United States Bureau of Reclamation (USSR) or developed from USSR data. Proposed flood protection provisions include site grading, drainage channels, and diversion dikes. Figures are provided to show these proposed flood protection provisions at each area investigated. These areas are the central surface facilities (including the waste-handling building and waste treatment building), tuff ramp portal, waste ramp portal, men-and-materials shaft, emplacement exhaust shaft, and exploratory shafts facility.

DeGabriele, C.E.; Wu, C.L. [Bechtel National, Inc., San Francisco, CA (United States)

1991-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Fracture Toughness and Maximum Stress in a Disordered Lattice System  

E-Print Network [OSTI]

Fracture in a disordered lattice system is studied. In our system, particles are initially arranged on the triangular lattice and each nearest-neighbor pair is connected with a randomly chosen soft or hard Hookean spring. Every spring has the common threshold of stress at which it is cut. We make an initial crack and expand the system perpendicularly to the crack. We find that the maximum stress in the stress-strain curve is larger than those in the systems with soft or hard springs only (uniform systems). Energy required to advance fracture is also larger in some disordered systems, which indicates that the fracture toughness improves. The increase of the energy is caused by the following two factors. One is that the soft spring is able to hold larger energy than the hard one. The other is that the number of cut springs increases as the fracture surface becomes tortuous in disordered systems.

Chiyori Urabe; Shinji Takesue

2008-12-29T23:59:59.000Z

462

A new scanning photoemission microscope for ELETTRA: SuperMAXIMUM  

Science Journals Connector (OSTI)

High brightness third?generation synchrotrons allow diffraction?limited performance and large flux for scanning photoemission microscopes. A new microscope SuperMAXIMUM is being developed at the University of Wisconsin Center for X ray Lithography in collaboration with the Sincrotrone Trieste. The beamline being built in Trieste uses a variable angle spherical gratingmonochromator (VASGM). A combination of rotation of a plane mirror and rotation of the spherical grating keeps the slit positions and beam directions fixed. The microscope objectives are normal?incidence multilayer?coated Schwarzschild objectives. The project which is nearing completion utilizes novel designs for optics alignment sample rastering mechanics and software control. We will discuss the project status new designs and techniques.

John T. Welnak; H. Solak; J. Wallace; F. Cerrina; F. Barbo; M. Bertolo; A. Bianco; S. Di Fonzo; S. Fontana; W. Jark; F. Mazzolini; R. Rosei; A. Savoia; J.H. Underwood; G. Margaritondo

1996-01-01T23:59:59.000Z

463

A new scanning photoemission microscope for ELETTRA: SuperMAXIMUM  

SciTech Connect (OSTI)

High brightness, third-generation synchrotrons allow diffraction-limited performance and large flux for scanning photoemission microscopes. A new microscope, SuperMAXIMUM, is being developed at the University of Wisconsin Center for X ray Lithography in collaboration with the Sincrotrone Trieste. The beamline, being built in Trieste, uses a variable angle spherical grating monochromator (VASGM). A combination of rotation of a plane mirror and rotation of the spherical grating keeps the slit positions and beam directions fixed. The microscope objectives are normal-incidence, multilayer-coated Schwarzschild objectives. The project, which is nearing completion, utilizes novel designs for optics alignment, sample rastering mechanics, and software control. We will discuss the project status, new designs, and techniques. {copyright} {ital 1996 American Institute of Physics.}

Welnak, J.T.; Solak, H.; Wallace, J.; Cerrina, F.; Barbo, F.; Bertolo, M.; Bianco, A.; Di Fonzo, S.; Fontana, S.; Jark, W.; Mazzolini, F.; Rosei, R.; Savoia, A.; Underwood, J.; Margaritondo, G. [University of WI--Center for X ray Lithography, 3731 Schneider Drive, Stoughton, WI 53589 (United States)] [University of WI--Center for X ray Lithography, 3731 Schneider Drive, Stoughton, WI 53589 (United States); [Sincrotrone Trieste, Padriciano 99, 34012, Trieste (Italy); [Lawrence Berkeley Laboratory, Center for X ray Optics, 1 Cyclotron Road, 80-101, Berkeley, CA 94720 (United States); [Institut de Physique Appliqee, Ecole Polytechnique Federale, CH-1015, Lausanne (Switzerland)

1996-09-01T23:59:59.000Z

464

Installation of the MAXIMUM microscope at the ALS  

SciTech Connect (OSTI)

The MAXIMUM scanning x-ray microscope, developed at the Synchrotron Radiation Center (SRC) at the University of Wisconsin, Madison was implemented on the Advanced Light Source in August of 1995. The microscope`s initial operation at SRC successfully demonstrated the use of multilayer coated Schwarzschild objective for focusing 130 eV x-rays to a spot size of better than 0.1 micron with an electron energy resolution of 250meV. The performance of the microscope was severely limited, because of the relatively low brightness of SRC, which limits the available flux at the focus of the microscope. The high brightness of the ALS is expected to increase the usable flux at the sample by a factor of 1,000. The authors will report on the installation of the microscope on bending magnet beamline 6.3.2 at the ALS and the initial measurement of optical performance on the new source, and preliminary experiments with surface chemistry of HF etched Si will be described.

Ng, W.; Perera, R.C.C.; Underwood, J.H. [Lawrence Berkeley Lab., CA (United States); Singh, S.; Solak, H.; Cerrina, F. [Univ. of Wisconsin, Stoughton, WI (United States). Center for X-ray Lithography

1995-10-01T23:59:59.000Z

465

LANDFILL OPERATION FOR CARBON SEQUESTRATION AND MAXIMUM METHANE EMISSION CONTROL  

SciTech Connect (OSTI)

The work described in this report, to demonstrate and advance this technology, has used two demonstration-scale cells of size (8000 metric tons [tonnes]), sufficient to replicate many heat and compaction characteristics of larger ''full-scale'' landfills. An enhanced demonstration cell has received moisture supplementation to field capacity. This is the maximum moisture waste can hold while still limiting liquid drainage rate to minimal and safely manageable levels. The enhanced landfill module was compared to a parallel control landfill module receiving no moisture additions. Gas recovery has continued for a period of over 4 years. It is quite encouraging that the enhanced cell methane recovery has been close to 10-fold that experienced with conventional landfills. This is the highest methane recovery rate per unit waste, and thus progress toward stabilization, documented anywhere for such a large waste mass. This high recovery rate is attributed to moisture, and elevated temperature attained inexpensively during startup. Economic analyses performed under Phase I of this NETL contract indicate ''greenhouse cost effectiveness'' to be excellent. Other benefits include substantial waste volume loss (over 30%) which translates to extended landfill life. Other environmental benefits include rapidly improved quality and stabilization (lowered pollutant levels) in liquid leachate which drains from the waste.

Don Augenstein

2001-02-01T23:59:59.000Z

466

Probable maximum point rainfall estimation for the southern half of the Indian peninsula  

Science Journals Connector (OSTI)

Preparation of a generalized chart of probable maximum precipitation (PMP) for the southern half of the Indian peninsula lying between lat. 8N to 16N has been attempted in this study. Maximum 1-day rainfall ...

O N Dhar; A K Kulkarni; P R Rakhecha

1981-03-01T23:59:59.000Z

467

_PART I - THE SCHEDULE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OPTION: SAVANNAH RIVER TRITIUM OPERATIONS (SRTO) ................. 3 OPTION: SAVANNAH RIVER TRITIUM OPERATIONS (SRTO) ................. 3 CLIN 0001H WORK FOR OTHERS/OTHER REIMBURSABLE WORK ............................. 4 CLIN 0002 URANIUM PROCESSING FACILITY (UPF) PROJECT MANAGEMENT........ 5 B-1 CONTRACT TYPE AND VALUE ............................................................................... 6 B-2 CONTRACT FEE STRUCTURES ............................................................................... 6 B-3 SINGLE FEE ............................................................................................................. 10 B-4 KEY PERSONNEL REPLACEMENT ....................................................................... 10 B-5 OBLIGATION OF FUNDS ....................................................................................... 11

468

Revised July 2013 ANNUAL LIVING EXPENSES*  

E-Print Network [OSTI]

ESTIMATED UNDERGRADUATE COST** TOTAL: (includes Fall & Spring semesters only) $38,668.00 GLOBAL PATHWAYS Insurance: $ 1,740.00 Other Expenses: $ 5,166.00 Annual Living Expenses Total: $18,508.00 NON) $19,885.00 Matriculation Fee: (one time charge only) $125.00 Tuition & Fees Total: $20,160.00 TOTAL

Tipple, Brett

469

Colorado Other state (St. abbr._____) 1. Do you have a college degree? No Yes If yes, highest degree and date awarded  

E-Print Network [OSTI]

RESIDENCY Colorado ¨ Other state (St. abbr._____) 1. Do you have a college degree? No Yes If yes. If yes, download and submit the Criminal History Supplement form from this link: http://conted.colorado OF COLORADO BOULDER Tuition and Fee Agreement and Disclosure The payment of all tuition, fees and charges

Stowell, Michael

470

Regular exercise is an important part of living a healthy lifestyle, and we want to do whatever we can to help you and your family incorporate  

E-Print Network [OSTI]

Health Plan membership includes a $150 rebate per household toward your health and fitness club* fees equipment for cardiovascular and strength-training, and improving physical fitness. **The rebate applies club fees. The $150 rebate may be considered taxable income. Requests for rebates without

Fraden, Seth

471

17/01/2014 LIB.UTS.EDU.AU UTS CRICOS Provider Code: 00099F UTS: LIBRARY  

E-Print Network [OSTI]

of space immediately outside the UTS Library entrance (external space) · filming and photography inside for and with authority for booking a venue or otherwise using space at the UTS Library. Where no fees apply, the term for and with authority for booking a venue or otherwise using space at the UTS Library. Where fees apply, the term

University of Technology, Sydney

472

Scholarly Communications Project, University Libraries, Virginia Tech 1 Electronic Theses & Dissertations  

E-Print Network [OSTI]

to information FServe more clients with fewer staff FCost savings: library and students save shelf space: from author to public access 1. Student author submits ETD goes directly to permanent library/archival server access/archive fee replaced binding fee 2. Graduate School approves 3. Library generates public

Beex, A. A. "Louis"

473

May/June 2008 Subscriptions Insect Growth Regulators PIB Gets Nod  

E-Print Network [OSTI]

__________________________________________________________________________________________ Subscriptions Insect Growth Regulators PIB Gets Nod Apiary Assessments Again? Canadian Colony Losses CA 4-H Essays Heat Treating Nosema Spores How Are Almonds Doing? Fungicides & Honey Bees New Bee Biology Text with the size of assessment fees and the distribution of those fees among the state and county offices, as well

Ferrara, Katherine W.

474

Who qualifies? Students who are  

E-Print Network [OSTI]

Fees paid by student: Student may elect to have these charges added back to the student account.212) 4) Optional Fees paid by student: Student may elect to have these charges added back to the student #12;Temporary vs. Permanent Coding · To expedite the processing of credits, a temporary code

Rock, Chris

475

Scholars Summer 2013 2521 Galen Drive Champaign, IL 61821 217.356.6995 phone www.nextgenerationschool.com  

E-Print Network [OSTI]

: Courses are organized by grade level. EARLY PRIMARY STUDENTS Class: Beginning World Explorers Teacher Location: NGS Primary/Middle School Tuition Cost: $150 Supplies Fee: $20 Description: Spend a week Location: NGS Primary/Middle School Tuition Cost: $150 Supplies Fee: $20 Description: Learning about

Bashir, Rashid

476

2014 Catalog Helping Hands I 7/21-7/25 from 8-11 AM  

E-Print Network [OSTI]

(Primary C Teacher & Cheer Coach) Learn how to spread school spirit and amp up Supply Fee grades K - 2 Instructor: Hillary Davis (Primary C Teacher) Supply Fee: $20 Fun & Functional For students who have completed grades K - 4 Instructor: Hillary Davis & Jenna Grites (Primary C

Bashir, Rashid

477

MS&E 235: Internet Commerce Problem Set 2, Due Tuesday, February 12, 2008 (in class for non-SCPD students)  

E-Print Network [OSTI]

. Assume that a typical consumer rents 8 movies per month. Assume that the top 100 movies have a royalty fee of $2 that netflix must pay, the next 900 have a royalty of $1.50, and the rest have a royalty in the royalty fee for the first tier? For the third? [10pts] 2 #12;

Goel, Ashish

478

Ohio University research, scholarship, and creative activity At the request of University System of  

E-Print Network [OSTI]

applications, and nine patents related to energy and the environment, generating $745,000 in royalty fees from in royalty fees from the drug Somavert. The center's programs also will contribute to economic development the basis for the drug Somavert. The university also receives royalty income from licenses for inventions

Botte, Gerardine G.

479

Should You Join a Landowner Group? Gas Royalties  

E-Print Network [OSTI]

Should You Join a Landowner Group? Gas Royalties Penn State is committed to affirmative action will sign for the exact same rental fees and royalties, landowners in the bargaining unit will receive with this group. It could be an up-front fee per acre or a per- centage of the royalty, or both. What are other

Boyer, Elizabeth W.

480

MS&E 235: Internet Commerce Problem Set 2, Due Tuesday, April 28, 2008  

E-Print Network [OSTI]

consumer rents 8 movies per month. Assume that the top 100 movies have a royalty fee of $2 that netflix must pay, the next 900 have a royalty of $1.50, and the rest have a royalty of $0.50. Compute 1 #12;Netflix's cost per customer. How sensitive is this number to a $0.25 change in the royalty fee

Goel, Ashish

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

39892 Federal Register / Vol. 75, No. 133 / Tuesday, July 13, 2010 / Proposed Rules (II).'' Any party that files an objection to  

E-Print Network [OSTI]

, Television. Proposed Regulations For the reasons set forth in the preamble, the Copyright Royalty Judges: PART 386--ADJUSTMENT OF ROYALTY FEES FOR SECONDARY TRANSMISSIONS BY SATELLITE CARRIERS Sec. 386.1 General. 386.2 Royalty fee for secondary transmission by satellite carriers. Authority: 17 U.S.C. 119(c

482

SBIR/STTR ALERTING SERVICE --October 8, 2010 The SBIR/STTR Alerting Service is a free service that provides bi-weekly notification of SBIR and STTR  

E-Print Network [OSTI]

topics will soon be added to the included in SBIR Topic Search Engine. -- DOT FY11.1 SBIR Solicitation,000 each. Phase II and Phase IIB awards will be either cost plus fixed-fee or fixed fee contracts or some Smartphone Signal Alert Status 111.1-FH2 Augmenting Inductive Loop Vehicle Sensor Data with SPAT and Gr

483

127 Eastern Ave Gloucester MA 01930  

E-Print Network [OSTI]

) Course fees to Project DEEP cover instruction, open water logistics, registration & certification fees). The instructional agency is Project DEEP, a non profit school that teaches diving at Umass, Smith, and Hampshire. Students must register with UMass to receive credit. b) Project DEEP will provide, buoyancy compensators

Schweik, Charles M.

484

CONFERENCE REGISTRATION FORM TO REGISTER FOR THE CONFERENCE  

E-Print Network [OSTI]

CONFERENCE REGISTRATION FORM TO REGISTER FOR THE CONFERENCE: EITHER Fill in the information below to the address indicated. OR Register online using your credit card at www.mcgill.ca/continuingstudies/programs-and-courses/mcll/conference and Plan for the Next Generation WEDNESDAY, AUGUST 20, 2014 #12;CONFERENCE FEE: The fee includes lunch

Kambhampati, Patanjali

485

Expenditure by Colleges of Advanced Technology in Britain  

Science Journals Connector (OSTI)

... at the colleges of advanced technology to be 660,000. He estimated net recurrent expenditure after allowing for income receivable from fees and sources other than Ministry grant was ... receivable from fees and sources other than Ministry grant was 7,532,107, besides capital ...

1962-06-16T23:59:59.000Z

486

ASM Materials Camp 2012 University of WisconsinMadison August 610, 2012  

E-Print Network [OSTI]

school teachers of general science, chemistry, physics, math, and technology; middle school science, but also supplies (including a NACE corrosion kit) and the STEM Handbook (a valuable reference). Workshop fees No fees. This commuter program includes lunch and supplies; it does not include transporta- tion

Evans, Paul G.

487

Mobile and Ubiquitous Computing RFID Applications  

E-Print Network [OSTI]

for air traffic management · Employs the secondary surveillance radar · Air traffic management uses Mode 3 fees · Battery powered device on the vehicle · Interrogator installed at the toll portal · Credit stored in the tag and fees deducted at every passage #12;Car immobilizers · Battery operated · Usually

Roussos, George

488

The integrity of oil and gas wells  

Science Journals Connector (OSTI)

...collected ?$225 million in impact fees. What Pennsylvania...Pennsylvania. Most of the impact fees that Pennsylvania...Yoxtheimer D Abad JD ( 2013 ) Impact of shale gas development on regional...environmental costs and benefits of fracking. Annu Rev Environ Resour...

Robert B. Jackson

2014-01-01T23:59:59.000Z

489

UNIVERSITY OF NORTHERN BRITISH COLUMBIA OFFICE OF HUMAN RESOURCES  

E-Print Network [OSTI]

and annually on the member statement. UNBC Pension Plan Opertions Old Fees New Fees SLF Fund Operating Expenses.60% 0.50% 0.035% 0.020% 0.66% 0.56% SLF Money Market 0.35% 0.15% 0.030% 0.0063% 0.39% 0.19% SLF 1, 3

Northern British Columbia, University of

490

Living in Grenoble I. Accomodation......................................................................................................................... 1  

E-Print Network [OSTI]

....................................................................................... 12 XII. Services and utilities (electricity, gas, water, telephone, internet attend either a free state school or a fee-paying private school (fees vary from one school to another (electricity bill, lease, etc...) Primary school, or école élémentaire (compulsory from the age of 6

Canet, Léonie

491

Access Agreement Principal Contact for Enquiries  

E-Print Network [OSTI]

Access Agreement 2014/15 Contents 1) Introduction 3 2) Fees, Student Numbers and Fee Income 4 3, strong community spirit and excellent student life. Observing Keele's founding ethos of 'the pursuit of education for individuals, communities and society and equality of opportunity. 1.2 Our University Mission

Stell, John

492

Per Semester Paid to Binghamon University  

E-Print Network [OSTI]

,219.00$ 10/30/2012 SEE NEXT PAGE FOR COMPLETE COST EXPLANATIONS University College Utrecht Exchange Program: These fees apply to Binghamton students. Other SUNY campuses have their own policies regarding fees charged with a financial aid counselor before making the decision to apply. Once admitted to the program, students

Suzuki, Masatsugu

493

Impending United States Energy Crisis  

Science Journals Connector (OSTI)

...financial incentives, the U.S. petroleum industry cannot muster the...effective national action. An oil import fee would raise domestic oil...help stabilize the U.S. petroleum industry and spark some renewed...10 per barrel fee at current import levels could add about $30...

ROBERT L. HIRSCH

1987-03-20T23:59:59.000Z

494

Weighted Guidelines  

Broader source: Energy.gov (indexed) [DOE]

───────────────────────────────────Chapter 15.4-2 (July 2010) 1 Weighted Guidelines [References: FAR 15.4, DEAR 915.4] Overview This section provides guidance for applying the Department of Energy's (DOE) structured approach in determining profit/fee. Background The Federal Acquisition Regulation (FAR) requires consideration of certain factors (described in 15.404-4 as "profit-analysis factors" or "common factors") in developing a structured profit/fee approach. It does not prescribe specific government-wide procedures for profit/fee analysis. Actual profit/fee may vary (FAR 15.404-4(a) (1)) as you perform your profit/fee analysis;

495

265_25-1-3.htm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

_25-1-3.htm _25-1-3.htm 265:25-1-3. Incorporated national codes and standards The following national codes and standards are incorporated by reference: (1) International Building Code and its appendices, 2006 Edition, with the following modifications: (A) Section 108.1 Fee Schedule: Add additional wording to read as follows: A fee for each plan examination, building permit, and inspection shall be paid in accordance with the following schedule: (i) Exemptions: the following entities are exempt from the fees associated with this section, except for archiving fees: Detention centers that require an inspection are exempt inspection fees and Fire Departments duly constituted and meeting the reporting requirements of the State Fire Marshal Agency.

496

Microsoft Word - 2008 Letter Report  

Broader source: Energy.gov (indexed) [DOE]

Prepared for Prepared for Office of Civilian Radioactive Waste Management U.S. Department of Energy 1000 Independence Avenue, SW Washington, D.C. 20585 Prepared by 490 L'Enfant Plaza North SW Washington, DC 20024 January 13, 2009 CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT This Page Intentionally Left Blank Civilian Radioactive Waste Management Fee Adequacy Assessment Letter Report i Executive Summary This Fiscal Year 2008 Civilian Radioactive Waste Management Fee Adequacy Letter Report presents an evaluation of the adequacy of the one mill per kilowatt-hour fee paid by commercial nuclear power generators for the permanent disposal of their spent nuclear fuel by the Government. This evaluation recommends no fee change.

497

Srfees  

Broader source: Energy.gov (indexed) [DOE]

WESTINGHOUSE SAVANNAH WESTINGHOUSE SAVANNAH RIVER COMPANY' S WITHDRAW OF FEES U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES APRIL 1999 ER-B-99-05 DEPARTMENT OF ENERGY Washington, DC 20585 April 8, 1999 MEMORANDUM FOR THE MANAGER, SAVANNAH RIVER OPERATIONS OFFICE FROM: Terry L. Brendlinger, Manager (Signed) Eastern Regional Audit Office Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Westinghouse Savannah River Company's Withdrawal of Fees" BACKGROUND As the operator of the Department's Savannah River Site, Westinghouse Savannah River Company (Westinghouse) receives three types of fees: (1) award fees commensurate with the overall performance rating, (2) Performance Based Incentive (PBI) fees for achieving measurable goals or defined tasks as

498

Maximum Entropy and Bayesian Statistics in Crystallography: a Review of Practical Applications  

Science Journals Connector (OSTI)

The applications of the maximum entropy and Bayesian methods to problems in X-ray, neutron and electron crystallography are reviewed.

Gilmore, C.J.

1996-07-01T23:59:59.000Z

499

An Improved Maximum Likelihood Formulation for Accurate Genome Assembly Aditya Varma, Abhiram Ranade and Srinivas Aluru  

E-Print Network [OSTI]

An Improved Maximum Likelihood Formulation for Accurate Genome Assembly Aditya Varma, Abhiram maximum likelihood method for genome assembly. We formulate the problem as one of direct convex estimate of the length of the genome or the need to use further expectation minimization to predict

Ranade, Abhiram G.

500

A 6/5-approximation algorithm for the maximum 3-cover problem  

Science Journals Connector (OSTI)

In the maximum cover problem, we are given a collection of sets over a ground set of elements and a positive integer w, and we are asked to compute a collection of at most w sets whose union contains the maximum ...

Ioannis Caragiannis; Gianpiero Monaco

2013-01-01T23:59:59.000Z