Powered by Deep Web Technologies
Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

fees  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PRIME CONTRACTOR FEES ON PRIME CONTRACTOR FEES ON SUBCONTRACTOR COSTS U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES AUDIT REPORT DOE/IG-0427 SEPTEMBER 1998 September 11, 1998 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Acting Inspector General SUBJECT: INFORMATION : Audit Report on "The U.S. Department of Energy's Prime Contractor Fees on Subcontractor Costs" BACKGROUND In Fiscal Year 1996, the Department's prime contractors awarded $5.3 billion in subcontracts. The purpose of this audit was to determine if the Department adjusted the fee bases of prime contractors to reflect the actual effort necessary to manage the technical and administrative activities of their subcontractors.

2

FOIA FEES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fees Fees The FOIA generally requires that requestors pay fees for processing their requests. If costs associated with the processing of a FOIA request are $15.00 or less, no fees are charged. Each FOIA request is reviewed for the purpose of placing a requestor in one of four fee categories described below: 1. Commercial use requestor: Responsible for all direct costs; i.e. search for responsive documents, review of documents located for responsiveness; 16% administrative costs; reproduction cost of $.05 per page; and the time it took the FOIA Contact Person to process the request. 2. Requestors who are representative of the news media: Responsible for reproduction costs after the first 100 pages. 3. Educational and non-commercial scientific institution requestors:

3

Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Period Period Total Fee Paid 4/29/2012 - 9/30/2012 $418,348 10/1/2012 - 9/30/2013 $0 10/1/2013 - 9/30/2014 $0 10/1/2014 - 9/30/2015 $0 10/1/2015 - 9/30/2016 $0 Cumulative Fee Paid $418,348 Contract Type: Cost Plus Award Fee Contract Period: $116,769,139 November 2011 - September 2016 $475,395 $0 Fee Information Total Estimated Contract Cost $1,141,623 $1,140,948 $1,140,948 $5,039,862 $1,140,948 Maximum Fee $5,039,862 Minimum Fee Fee Available Portage, Inc. DE-DT0002936 EM Contractor Fee Site: MOAB Uranium Mill Tailings - MOAB, UT Contract Name: MOAB Uranium Mill Tailings Remedial Action Contract September 2013 Contractor: Contract Number:

4

Contractor Fee Payments - Richland Operations Office | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

More Documents & Publications Contractor Fee Payments - Office of River Protection Contractor Fee Payments - Savannah River Site Office Contractor Fee Payments - Carlsbad Field...

5

Fee Title: Renewable Energy Fee Measure #: Measure 44  

E-Print Network (OSTI)

Fee Title: Renewable Energy Fee Measure #: Measure 44 Ballot Information Shall the undergraduates and graduate students of UCSC amend Measure 28, the Renewable Energy fee passed in Spring 2006 as follows: The amendment would allow funds to be used for on-site renewables and energy efficiency projects

California at Santa Cruz, University of

6

Contractor Fee Payments- Small Sites  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Small Sites office on these charts.

7

Performance Period Total Fee Paid FY2001  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 01 $4,547,400 FY2002 $4,871,000 FY2003 $6,177,902 FY2004 $8,743,007 FY2005 $13,134,189 FY2006 $7,489,704 FY2007 $9,090,924 FY2008 $10,045,072 FY2009 $12,504,247 FY2010 $17,590,414 FY2011 $17,558,710 FY2012 $14,528,770 Cumulative Fee Paid $126,281,339 Cost Plus Award Fee DE-AC29-01AL66444 Washington TRU Solutions LLC Contractor: Contract Number: Contract Type: $8,743,007 Contract Period: $1,813,482,000 Fee Information Maximum Fee $131,691,744 Total Estimated Contract Cost: $4,547,400 $4,871,000 $6,177,902 October 2000 - September 2012 Minimum Fee $0 Fee Available EM Contractor Fee Site: Carlsbad Field Office - Carlsbad, NM Contract Name: Waste Isolation Pilot Plant Operations March 2013 $13,196,690 $9,262,042 $10,064,940 $14,828,770 $12,348,558 $12,204,247 $17,590,414 $17,856,774

8

EM Contractor Fee Payments | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Fee Payments Contractor Fee Payments EM Contractor Fee Payments In the interest of furthering transparency in its government operations, the Department of Energy's Office of Environmental Management (EM) herein is releasing information relating to fee payments under its major cost-reimbursable contracts. Charts delineating fees that are paid under cost-plus-award-fee (CPAF), cost-plus-incentive-fee (CPIF), and cost-plus-fixed-fee (CPFF) contracts are listed by site location in the following hyperlinks. With CPFF contracts, the fee is negotiated and fixed at the inception of the contract. The fixed fee will not vary with the actual costs that the contractor incurs. In general, the contractor earns fee either by completing the work called for in the contract or devoting a specified

9

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

$ 3,422,994.00 $ 3,422,994.00 FY2011 4,445,142.00 $ FY2012 $ 5,021,951.68 FY2013 $ 3,501,670.00 FY2014 $0 FY2015 $0 FY2016 $0 FY2017 $0 FY2018 $0 FY2019 $0 Cumulative Fee Paid $16,391,758 Wackenhut Services, Inc. DE-AC30-10CC60025 Contractor: Cost Plus Award Fee $989,000,000 Contract Period: Contract Type: January 2010 - December 2019 Contract Number: EM Contractor Fee Site: Savannah River Site Office - Aiken, SC Contract Name: Comprehensive Security Services September 2013 Fee Information Maximum Fee $55,541,496 $5,204,095 $3,667,493 $5,041,415 Minimum Fee 0 Fee Available $5,428,947 $6,326,114

10

"Case Name","CO2 Fees",,"Cap and Trade","Fee/Allowance Revenue...  

U.S. Energy Information Administration (EIA) Indexed Site

"Table 1. CO2 FeeCap and Trade Runs for AEO Supplement" "Case Name","CO2 Fees",,"Cap and Trade","FeeAllowance Revenue Treatment",,,"Offsets" ,"Start ()","Real Rate of...

11

Contractor Fee Payments- Idaho Operations Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Idaho Operations Office on these charts.

12

Contractor Fee Payments- Oak Ridge Operations  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Oak Ridge Operations on these charts.

13

Contractor Fee Payments- Carlsbad Field Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Carlsbad Field Office on these charts.

14

Contractor Fee Payments- Savannah River Site Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts.

15

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fee 0 May 2011 - September 2015 June 2013 Contractor: Contract Number: Contract Type: Idaho Treatment Group LLC DE-EM0001467 Cost Plus Award Fee Fee Information 419,202,975...

16

Alternative Fuels Data Center: Electric Vehicle (EV) Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fee to someone by E-mail Fee to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Fee on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Electric Vehicle (EV) Fee EV operators must pay an annual vehicle registration renewal fee of $100. This fee expires if the legislature imposes a vehicle miles traveled fee or

17

Water Pollution Fee (Michigan) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Pollution Fee (Michigan) Water Pollution Fee (Michigan) Water Pollution Fee (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Michigan Program Type Fees Siting and Permitting Provider Department of Environmental Quality The Groundwater Program regulates discharge to groundwater under Part 31, Water Resources Protection, of the Natural Resources and Environmental Protection Act, 1994 PA 451 and Part 22 Rules. Groundwater staff review

18

Contractor Fee Payments - Portsmouth Paducah Project Office ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

- LATA of Kentucky Paducah Infrastructure Support Portsmouth D&D Operation of DUF6 Portsmouth Facility Support Services More Documents & Publications Contractor Fee...

19

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT This Fiscal Year...

20

WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE DOE F 4220.23 (06-95) U.S. DEPARTMENT OF ENERGY 1. CONTRACTOR IDENTIFICATION 2. TYPE OF ACQUISTION ACTION (REFER TO OFPP MANUAL, FEDERAL PROCUREMENT DATA SYSTEMS - PRODUCT AND SERVICE CODES. APRIL 1980) a. Name c. Street address b. Division (If any) d. City e. State f. Zip code a. SUPPLIES & EQUIPMENT b. RESEARCH & DEVELOPMENT c. SERVICES: (1) ARCHITECT-ENGINEER: (2) MANAGEMENT SERVICES: (3) MEDICAL: (4) OTHER (e.g., SUPPORT SERVICES) 3. ACQUISITION INFORMATION a. Purchasing Offices b. Contract type d. FY c. RFP/RFQ No. e. Contract No. PROFIT/FEE OBJECTIVE COMPUTATION PROFIT/FEE CONSIDERATIONS a. MEASUREMENT BASE b. PROFIT/FEE WEIGHT RANGES (%) c. ASSIGNED

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Water Use Fees (Wisconsin) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Use Fees (Wisconsin) Water Use Fees (Wisconsin) Water Use Fees (Wisconsin) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Buying & Making Electricity Water Home Weatherization Program Info Start Date 2011 State Wisconsin Program Type Fees Provider Department of Natural Resources Annual $125 water use fees are charged by the State of Wisconsin to each property that has the capacity to withdraw 100,000 gallons per day or more

22

Alternative Fuels Data Center: Fleet User Fee Exemption  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fleet User Fee Fleet User Fee Exemption to someone by E-mail Share Alternative Fuels Data Center: Fleet User Fee Exemption on Facebook Tweet about Alternative Fuels Data Center: Fleet User Fee Exemption on Twitter Bookmark Alternative Fuels Data Center: Fleet User Fee Exemption on Google Bookmark Alternative Fuels Data Center: Fleet User Fee Exemption on Delicious Rank Alternative Fuels Data Center: Fleet User Fee Exemption on Digg Find More places to share Alternative Fuels Data Center: Fleet User Fee Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fleet User Fee Exemption Fleets with 10 or more vehicles located in defined areas of the state must pay an annual user fee of $20 per vehicle. Owners of electric vehicles and

23

Nuclear Waste Fund fee adequacy: An assessment  

SciTech Connect

The purpose of this report is to present the Department of Energy`s (the Department) analysis of the adequacy of the 1.00 mill per kilowatt-hour (kWh) fee being paid by the utilities generating nuclear power for the permanent disposal of their spent nuclear fuel (SNF). In accordance with the Nuclear Waste Policy Act (NWPA), the SNF would be disposed of in a geologic repository to be developed by the Department. An annual analysis of the fee`s adequacy is required by the NWPA.

NONE

1990-11-01T23:59:59.000Z

24

Annual Emission Fees (Michigan) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Emission Fees (Michigan) Annual Emission Fees (Michigan) Annual Emission Fees (Michigan) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State Michigan Program Type Fees Provider Department of Environmental Quality The Renewable Operating Permit (ROP) is required by Title V of the Clean Air Act Amendments of 1990. The ROP program clarifies the requirements that apply to a facility that emits air contaminants. Any facility in Michigan

25

Audit fees and book-tax differences  

E-Print Network (OSTI)

We investigate whether book-tax differences are associated with higher audit fees, a proxy for auditor risk assessments and auditor effort. Our evidence suggests that there is a significantly positive relation. Further, ...

Hanlon, Michelle

26

VUV Detector Calibrations - Si Photodiode Fee Sheet  

Science Conference Proceedings (OSTI)

... from the x-ray region (response falls off at photon energies above ~10 ... The fee sheet for all detector types is available as a PDF ... Type, NIST Test No. ...

2012-01-26T23:59:59.000Z

27

Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Inefficient Fuel Inefficient Vehicle Fee to someone by E-mail Share Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Facebook Tweet about Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Twitter Bookmark Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Google Bookmark Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Delicious Rank Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on Digg Find More places to share Alternative Fuels Data Center: Fuel Inefficient Vehicle Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Fuel Inefficient Vehicle Fee New passenger vehicles meeting one of the following criteria are subject to an additional fee payable to the New Jersey Motor Vehicle Commission:

28

Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle (EV) Electric Vehicle (EV) Registration Fee to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Electric Vehicle (EV) Registration Fee The annual registration fee for an EV is $25.00 unless the vehicle is more

29

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Annual Fee to someone by E-mail Annual Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Annual Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) Annual Fee Owners of compressed natural gas and propane powered vehicles are required

30

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT This Fiscal Year 2008 Civilian Radioactive Waste Management Fee Adequacy Letter Report presents an evaluation of the adequacy of the one mill per kilowatt-hour fee paid by commercial nuclear power generators for the permanent disposal of their spent nuclear fuel by the Government. This evaluation recommends no fee change. CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT More Documents & Publications FY 2007 Fee Adequacy, Pub 2008 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear

31

Alternative Fuels Data Center: Ethanol Production Facility Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol Production Ethanol Production Facility Fee to someone by E-mail Share Alternative Fuels Data Center: Ethanol Production Facility Fee on Facebook Tweet about Alternative Fuels Data Center: Ethanol Production Facility Fee on Twitter Bookmark Alternative Fuels Data Center: Ethanol Production Facility Fee on Google Bookmark Alternative Fuels Data Center: Ethanol Production Facility Fee on Delicious Rank Alternative Fuels Data Center: Ethanol Production Facility Fee on Digg Find More places to share Alternative Fuels Data Center: Ethanol Production Facility Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol Production Facility Fee The cost to submit an air quality permit application for an ethanol production plant is $1,000. An annual renewal fee is also required for the

32

Water pollution Control Permit Fee Schedules (West Virginia) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

pollution Control Permit Fee Schedules (West Virginia) pollution Control Permit Fee Schedules (West Virginia) Water pollution Control Permit Fee Schedules (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Siting and Permitting Provider Department of Environmental Protection This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national

33

Alternative Fuels Data Center: Alternative Fuels Tax or Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuels Tax Alternative Fuels Tax or Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuels Tax or Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuels Tax or Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuels Tax or Fee A state excise tax applies to special fuels at a rate of $0.25 per gallon on a gasoline gallon equivalent basis. Special fuels include compressed

34

Privacy Act Fees and Time Limits | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

Privacy Act Fees and Time Limits The Act provides agencies to assess fees only for the cost of reproducing records. However, it is the policy of the DOE to provide an individual...

35

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

357,223 597,797 894,699 EM Contractor Fee Site: Stanford Linear Accelerator Center (SLAC) Contract Name: SLAC Environmental Remediation December 2012 1,516,646 Fee Available...

36

VUV Detector Calibrations - Al Oxide Photodiode Fee Sheet  

Science Conference Proceedings (OSTI)

... Type, NIST Test No. Fee (US Dollars). 5 - 17, Al 2 O 3, 40599S, $2,613. ... Type, NIST Test No. Fee (US Dollars). 5 - 17, Al 2 O 3, 40599S, $2,169. ...

2012-01-26T23:59:59.000Z

37

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Alternative Fuel Alternative Fuel Vehicle (AFV) User Fee Study to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) User Fee Study on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) User Fee Study

38

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Parking Fee Exemption to someone by E-mail Parking Fee Exemption to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Parking Fee Exemption on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

39

Permit Fees for Hazardous Waste Material Management (Connecticut...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Material Management (Connecticut) Permit Fees for Hazardous Waste Material Management (Connecticut) Eligibility Agricultural Commercial Construction Fed. Government...

40

Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Vehicle (EV) Electric Vehicle (EV) Registration Fee Reduction to someone by E-mail Share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Facebook Tweet about Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Twitter Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Google Bookmark Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Delicious Rank Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on Digg Find More places to share Alternative Fuels Data Center: Electric Vehicle (EV) Registration Fee Reduction on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Management Controls over Performance Fees in the Idaho National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Controls over Performance Fees in the Idaho National Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 Management Controls over Performance Fees in the Idaho National Laboratory Contract, OAS-M-06-07 The Department of Energy (Department) did not always effectively and Fees use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures and fees for Fiscal Year (FY) 2005, which were disproportionately high for the work performed. Four of the 49 measures and fees established for FY 2006 provided the contractor the opportunity to earn $1 million under similar circumstances. Also, some of the performance measures worth $460,000, were implemented well

42

Appendix D - Federal Highway User Fees  

NLE Websites -- All DOE Office Websites (Extended Search)

D - FEDERAL HIGHWAY USER FEES D - FEDERAL HIGHWAY USER FEES FEDERAL HIGHWAY-USER FEES 1/ OCTOBER 2001 TABLE FE-21B USER FEE TAX RATE DISTRIBUTION OF TAX EFFECTIVE DATE HIGHWAY TRUST FUND LEAKING UNDER- GROUND STORAGE TANK TRUST FUND GENERAL FUND HIGHWAY ACCOUNT MASS TRANSIT ACCOUNT Fuel Taxes (Cents per Gallon) Gasoline 18.3 01/01/96 12 2 - 4.3 18.4 10/01/97 15.44 2.86 0.1 - Diesel and Kerosene fuel 24.3 01/01/96 18 2 - 4.3 24.4 10/01/97 21.44 2.86 0.1 - Special fuels 2/ 3/ 18.3 01/01/96 12 2 - 4.3 Liquefied Petroleum Gas 13.6 10/01/97 11.47 2.13 - - Liquefied Natural Gas 11.9 10/01/97 10.04 1.86 - - Other Special Fuels 18.4 10/01/97 15.44 2.86 0.1 - Neat alcohol (85% alcohol) 3/ 4/ 9.25 10/01/97 7.72 1.43 0.1 - Compressed natural gas 5/ 4.3 10/01/93 - - - 4.3

43

Performance Period Total Fee Paid FY2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 FY2010 0 FY2011 0 FY2012 12,862 FY2013 0 Cumulative Fee Paid 12,862 1,111,678 URS Energy & Construction, Inc. DE-AT30-08CC60014SP16 Contractor: Contract Number: Minimum...

44

State Agency Employee Tuition Fee Waiver Application  

E-Print Network (OSTI)

State Agency Employee Tuition Fee Waiver Application Before completing this application, please: This application is for state agency employees only. If you are an employee of the University of Florida, please: Phone #: Alternate Phone #: Email Address: State Agency: Department: Work Address: Semester enrollment

Florida, University of

45

City of Asheville - Building Permit Fee Waiver | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver City of Asheville - Building Permit Fee Waiver < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 7/01/2009 State North Carolina Program Type Green Building Incentive Provider Building Safety Department The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings. Waivers for building permit fees may apply to residences with the following designations (the regular fee is in parentheses): * HealthyBuilt Home Certification* ($100) * Energy Star Rating ($100) * Geothermal heat pumps ($50)

46

Privacy Act Fees and Time Limits | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Fees and Time Limits | National Nuclear Security Administration Fees and Time Limits | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Privacy Act Fees and Time Limits Home > About Us > Our Operations > NNSA Office of General Counsel > Privacy Act (PA) of 1974 > Privacy Act Fees and Time Limits Privacy Act Fees and Time Limits The Act provides agencies to assess fees only for the cost of reproducing

47

Federal Court Dismisses Waste Fee Challenges | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Court Dismisses Waste Fee Challenges Federal Court Dismisses Waste Fee Challenges Federal Court Dismisses Waste Fee Challenges December 13, 2010 - 2:31pm Addthis The D.C. Circuit today dismissed petitions filed by the National Association of Regulatory Utility Commissioners (NARUC) and other entities seeking (1) to force the Department to issue an assessment of the adequacy of the nuclear waste fund fee and (2) compelling suspension of the fee. These petitions were filed before the Department's recent issuance of a new fee assessment, and, in that context, the court determined that the petitions were moot and unripe. The court's order can be found here. Addthis Related Articles NARUC Releases Cybersecurity Primer for Utility Regulators (June 2012) DOE Does Not Oppose Petitions to Intervene in Yucca Mountain NRC Proceeding

48

U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site  

Science Conference Proceedings (OSTI)

During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

NONE

1995-08-03T23:59:59.000Z

49

Rules and Regulations Governing the Establishment of Various Fees (Rhode  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Establishment of Various Fees the Establishment of Various Fees (Rhode Island) Rules and Regulations Governing the Establishment of Various Fees (Rhode Island) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Rhode Island Program Type Siting and Permitting Provider Department of Environmental Management These regulations describe the fees associated with several Department of Environmental Management regulatory programs, including programs pertaining

50

Operating Permits and Emission Fees (New Mexico) | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information New Mexico Program Type Environmental Regulations Fees The New Mexico Environment Department's Air Quality Bureau processes permit applications for industries that...

51

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fee September, 2013 Site: Portsmouth Paducah Project Office Contract Name: Operation of DUF6 Contractor: Babcock & Wilcox Conversion Services, LLC Contract Number:...

52

City of Asheville - Building Permit Fee Waiver | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial...

53

City of Tucson - Permit Fee Credit for Solar Energy Systems ...  

Open Energy Info (EERE)

Incentive Program Place Arizona Name City of Tucson - Permit Fee Credit for Solar Energy Systems Incentive Type Green Building Incentive Applicable Sector Commercial,...

54

City of Lakewood - Solar Permit Fee Rebate (Colorado) | Open...  

Open Energy Info (EERE)

Summary The City of Lakewood is providing rebates on permit fees paid by Lakewood homeowners and business owners who install solar water heating systems and photovoltaic (PV)...

55

Local Option - Building Permit Fee Waivers for Renewable Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

permit fees. Class I renewable energy projects include energy derived from solar power, wind power, fuel cells (using renewable or non-renewable fuels), methane gas from...

56

Selecting Optional Fees Optional fees include meal plans, money on Tigerstripe, and a TAPS yearbook. All  

E-Print Network (OSTI)

supports all of the services at Redfern and includes: · Professional services of primary health care on pharmaceuticals, psychological testing, laboratory and x- ray services. · After Hours Nursewise telephone service. http://sisweb.clemson.edu/ Health Fee Policy University policy requires all students registered for six

Bolding, M. Chad

57

Economic and equity effects of transportation utility fees  

E-Print Network (OSTI)

­ Residential costs would decrease ­ Retail costs would increase substantially · Not all trips are "generated" ­ Gas stations, groceries are pass-by trips ­ Mixed-use developments internalize some trips · Not all residents use transportation equally ­ Fee should be avoidable by non-users #12;Feasibility · Fee calculated

Levinson, David M.

58

DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS  

E-Print Network (OSTI)

DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS by Robert L. Bertini Kerri Date November 2002 4. Title and Subtitle DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION). The objectives of this report are to analyze data transmission options and provide cost estimates for VMT data

Bertini, Robert L.

59

Air Pollution Control Fees (Ohio) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Pollution Control Fees (Ohio) Air Pollution Control Fees (Ohio) Air Pollution Control Fees (Ohio) < Back Eligibility Utility Agricultural Investor-Owned Utility State/Provincial Govt Construction Municipal/Public Utility Local Government Rural Electric Cooperative Program Info State Ohio Program Type Environmental Regulations Fees Provider Ohio Environmental Protection Agency Facilities with a potential to emit any one regulated air pollutant of a quantity greater than or equal to 100 tons per year, or any one hazardous air pollutant (HAP) greater than or equal to 10 tons per year, or any combination of hazardous air pollutants greater than 25 tons per year, must submit, in a form and manner prescribed by the director, a fee emission report that quantifies the actual emission data for particulate matter,

60

PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP)  

NLE Websites -- All DOE Office Websites (Extended Search)

- March 2013 Page 1 - March 2013 Page 1 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP) 1 OCTOBER 2012 through 30 SEPTEMBER 2013 Contract No. DE- EM-0001971 I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) provides a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract. Fee determinations are not subject to the Disputes Clause of the contract. II. ORGANIZATIONAL STRUCTURE AND DUTIES The following organizational structure is established for administering the fee provisions of the contract. A. Roles and Responsibilities 1. Fee Determination Official (FDO) - The Head of Contracting Activity (HCA) has appointed the CBFO Manager as the FDO. The FDO

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Underground Injection Control Fee Schedule (West Virginia) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Injection Control Fee Schedule (West Virginia) Injection Control Fee Schedule (West Virginia) Underground Injection Control Fee Schedule (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Fees Provider Department of Environmental Protection This rule establishes schedules of permit fees for state under-ground injection control permits issued by the Chief of the Office of Water Resources. This rule applies to any person who is required to apply for and

62

Fiscal year 1999 Battelle performance evaluation and fee agreement  

SciTech Connect

Fiscal Year 1999 represents the third fill year utilizing a results-oriented, performance-based evaluation for the Contractor's operations and management of the DOE Pacific Northwest National Laboratory (here after referred to as the Laboratory). However, this is the first year that the Contractor's fee is totally performance-based utilizing the same Critical Outcomes. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractor's performance for the period October 1, 1998 through September 30, 1999, as required by Clauses entitled ''Use of Objective Standards of Performance, Self Assessment and Performance Evaluation'' and ''Performance Measures Review'' of the Contract DE-ACO6-76RL01830. Furthermore, it documents the distribution of the total available performance-based fee and the methodology set for determining the amount of fee earned by the Contractor as stipulated within the causes entitled ''Estimated Cost and Annual Fee,'' ''Total Available Fee'' and ''Allowable Costs and Fee.'' In partnership with the Contractor and other key customers, the Department of Energy (DOE) Headquarters (HQ) and Richland Operations Office (RL) has defined four critical outcomes that serve as the core for the Contractor's performance-based evaluation and fee determination. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory.

DAVIS, T.L.

1998-10-22T23:59:59.000Z

63

Local Option - Building Permit Fee Waivers for Renewable Energy Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Local Option - Building Permit Fee Waivers for Renewable Energy Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) Local Option - Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government General Public/Consumer Industrial Installer/Contractor Institutional Local Government Low-Income Residential Multi-Family Residential Nonprofit Residential Schools State Government Tribal Government Savings Category Bioenergy Alternative Fuel Vehicles Hydrogen & Fuel Cells Water Buying & Making Electricity Solar Home Weatherization Wind Program Info State Connecticut Program Type Solar/Wind Permitting Standards Provider Department of Energy and Environmental Protection As of July 2011, Connecticut authorizes municipalities to pass a local

64

Cost-share Fee Waiver request form Request for a cost share for a GSSP fee waiver on the following project. Documentation from granting  

E-Print Network (OSTI)

Cost-share Fee Waiver request form Request for a cost share for a GSSP fee waiver on the following project. Documentation from granting agency with information regarding tuition as unallowable must____________________________________________________________ Project Name __________________________________________________________________ Funding Agency

Taylor, Jerry

65

Avoided Gigawatts Through Utility Capital Recovery Fees  

E-Print Network (OSTI)

Electric rate structures can be used to provide customers with the proper pricing signals as well as provide economic incentives for increased market penetration for energy efficient new buildings. An innovative, marginal (replacement cost) rate structure is possible through the use of capital recovery fees for new electric meter hookups similar to those commonly used for new water and wastewater hookups where the developer/owner is required to capitalize the marginal cost of new demand. By giving credit for the more efficient loads placed on an electric utility system, a utility could rapidly advance the market penetration of commercially available, highly efficient building systems and equipment resulting in potential gigawatts of conserved energy. Simultaneously, the capital costs of new generating plants could be shifted to the end-user from the already debt-burdened electric utility industry. This paper will explore this pricing option and analyze its potential on future electric load growth and the design of efficient new buildings.

Frosenfeld, A. N.; Verdict, M. E.

1985-01-01T23:59:59.000Z

66

City of Riverhead - Energy Conservation Device Permitting Fees | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees City of Riverhead - Energy Conservation Device Permitting Fees < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Wind Program Info Start Date 07/01/2005 (retroactive) State New York Program Type Green Building Incentive Provider Building Department In 2006 the Town of Riverhead on Long Island enacted a special allowance in its building permit fee structure to provide a discount to people wishing to install energy conservation devices on residential or commercial buildings. The provision in the town code applies to any energy conservation device "installed in or on a structure which qualifies for any federal, state or local tax exemption, tax credit or tax rebate", but

67

Property Tax Fee-In-Lieu (Mississippi) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Property Tax Fee-In-Lieu (Mississippi) Property Tax Fee-In-Lieu (Mississippi) Property Tax Fee-In-Lieu (Mississippi) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Mississippi Program Type Property Tax Incentive Provider Mississippi Department of Revenue The Property Tax Fee-In-Lieu allows for new or expansion projects in the

68

Small Business Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Administration (SBA) Guarantee Fee Tax Credit Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) Small Business Administration (SBA) Guarantee Fee Tax Credit (Oklahoma) < Back Eligibility Agricultural Commercial Construction Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Oklahoma Program Type Corporate Tax Incentive Provider Small Business Administration The Small Business Administration (SBA) Guarantee Fee Tax Credit allows for small businesses operating in Oklahoma to claim a credit against income tax liability. This credit may be claimed for tax year 2012 and subsequent tax

69

Solid Waste Assessment Fee Exemptions (West Virginia) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solid Waste Assessment Fee Exemptions (West Virginia) Solid Waste Assessment Fee Exemptions (West Virginia) Solid Waste Assessment Fee Exemptions (West Virginia) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Program Info State West Virginia Program Type Rebate Program A person who owns, operates, or leases an approved solid waste disposal facility is exempt from the payment of solid waste assessment fees, upon the receipt of a Certificate of Exemption from the director, if that

70

Spent fuel management fee methodology and computer code user's manual.  

Science Conference Proceedings (OSTI)

The methodology and computer model described here were developed to analyze the cash flows for the federal government taking title to and managing spent nuclear fuel. The methodology has been used by the US Department of Energy (DOE) to estimate the spent fuel disposal fee that will provide full cost recovery. Although the methodology was designed to analyze interim storage followed by spent fuel disposal, it could be used to calculate a fee for reprocessing spent fuel and disposing of the waste. The methodology consists of two phases. The first phase estimates government expenditures for spent fuel management. The second phase determines the fees that will result in revenues such that the government attains full cost recovery assuming various revenue collection philosophies. These two phases are discussed in detail in subsequent sections of this report. Each of the two phases constitute a computer module, called SPADE (SPent fuel Analysis and Disposal Economics) and FEAN (FEe ANalysis), respectively.

Engel, R.L.; White, M.K.

1982-01-01T23:59:59.000Z

71

City of Riverhead- Energy Conservation Device Permitting Fees  

Energy.gov (U.S. Department of Energy (DOE))

In 2006 the Town of Riverhead on Long Island enacted a special allowance in its building permit fee structure to provide a discount to people wishing to install energy conservation devices on...

72

City of Philadelphia- Streamlined Solar Permitting and Fee Reduction  

Energy.gov (U.S. Department of Energy (DOE))

Photovoltaic systems of 10 kW or less installed on 1- or 2-family residential units are eligible for streamlined permitting and a fee reduction. PV projects can use a [http://www.phila.gov/green...

73

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. POLICYFLASH2013-24 disseminating the Dep Sec's memo of Jan 28 2013 on Fee...

74

Total Estimated Contract Cost: Performance Period Total Fee Paid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15,763,807 Contractor: 93,591,118 Fee Available Contract Period: Contract Type: URSCH2M Oak Ridge, LLC (UCOR) DE-SC-0004645 April 29, 2011 - July 13, 2016 Contract...

75

The Economics of Interchange Fees and Their Regulation: An Overview  

E-Print Network (OSTI)

This essay surveys the economic literature on interchange fees and the debate over whether interchange should be regulated and, if so, how. We consider, first, the operation of unitary payment systems, like American Express, ...

Evans, David

2005-07-08T23:59:59.000Z

76

City of Riverhead - Energy Conservation Device Permitting Fees...  

Open Energy Info (EERE)

not eligible for the Fast-Track process. Prior to the code revision permitting fees for solar panel installations often approached 1,000. Incentive Contact Contact Name Sharon...

77

Winter Deadlines Dec. 20 Last day to pay fees  

E-Print Network (OSTI)

for third party through National Student Clearinghouse only; fees vary 6.00 Transcript--additional services services, and release of academic transcripts. See the Registration section for additional information

Jalali. Bahram

78

NanoFab User Facility Usage Fee Schedule  

Science Conference Proceedings (OSTI)

Page 1. NanoFab User Facility Usage Fee Schedule Effective 11/1/09 Tool Full Rate ($/hr) Reduced Rate ($/hr) Base NanoFab Use 60 30 ...

79

Exemption + Fee for Alternative Fuel Vehicles (Oklahoma) | Open...  

Open Energy Info (EERE)

tax by purchasing a flat fee decal rather than paying excise tax at the pump. Propane or LPG is taxed at a rate of 50 per year, per vehicle of less than 1-ton capacity. AFVs...

80

Exemption + Fee for Alternative Fuel Vehicles (Oklahoma) Personal...  

Open Energy Info (EERE)

tax by purchasing a flat fee decal rather than paying excise tax at the pump. Propane or LPG is taxed at a rate of 50 per year, per vehicle of less than 1-ton capacity. AFVs...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

and Fee to someone by E-mail and Fee to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Google Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Delicious Rank Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel Vehicle (AFV) Tax and Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel Vehicle (AFV) Tax and Fee Compressed natural gas (CNG) used in motor vehicles is subject to a state

82

Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report  

Energy.gov (U.S. Department of Energy (DOE))

U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of the adequacy of the fee being paid by nuclear power utilities...

83

Federal fees and contracts for storage and disposal of spent LWR fuel  

SciTech Connect

The methodology for establishing a fee for federal spent fuel storage and disposal services is explained along with a presentation of the cost centers and cost data used to calculate the fee. Results of the initial fee calculation and the attendant sensitivity studies are also reviewed. The current status of the fee update is presented. The content of the proposed contract for federal services is briefly reviewed.

Clark, H.J.

1979-01-01T23:59:59.000Z

84

September 20, 2002: Last Day to Pay Fees September 26, 2002: Instruction Begins  

E-Print Network (OSTI)

an additional $50 late fee. For more information on paying fees, see "Billing." Mandatory Medical Insurance and is in addition to the amount due each term. To request MIP, students select it by marking that item materials fee, which is billed through the BAR statement, for the entire quarter. In addition, certain

Grether, Gregory

85

University Health Services -Routine Fees and Charges Effective July 1, 2012  

E-Print Network (OSTI)

University Health Services - Routine Fees and Charges Effective July 1, 2012 Visit Fees STUDENT's Health Annual/Wellness Exam New Patient $40.00 99385 $90.00 Women's Health Annual/Wellness Exam $116.00 Yellow Fever - 0.5cc $113.00 90717 $122.00 Laboratory Fees HIV 1 + 2 $28.00 86703 $28.00 Pap

86

GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions February 26, 2010 - 3:17pm Addthis Consistent with the Administration's commitment to transparency, DOE General Counsel Scott Blake Harris has decided that all future determinations as to the adequacy of the Nuclear Waste Fund fee will be made available to the public on DOE's website shortly after DOE makes a determination. The report relied upon in determining fee adequacy for 2008, the most recent year for which DOE has made a determination, is available here: (2008 Fee Adequacy Letter Report). Addthis Related Articles DOE Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee Department of Energy Files Motion to Withdraw Yucca Mountain License

87

Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Reduced Registration Reduced Registration Fee for Fuel-Efficient Vehicles to someone by E-mail Share Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Facebook Tweet about Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Twitter Bookmark Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Google Bookmark Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Delicious Rank Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on Digg Find More places to share Alternative Fuels Data Center: Reduced Registration Fee for Fuel-Efficient Vehicles on AddThis.com... More in this section... Federal State Advanced Search

88

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Fee Determinations: Requirement to Obtain 4 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Attached is Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. POLICY_FLASH_2013-24 disseminating the Dep Sec's memo of Jan 28 2013 on Fee Determ and AEs.pdf Fee Determinations - Requirement to Obtain Acquisition Executive's Input.pdf More Documents & Publications Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule

89

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Fee Determinations: Requirement to Obtain 4 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Attached is Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. POLICY_FLASH_2013-24 disseminating the Dep Sec's memo of Jan 28 2013 on Fee Determ and AEs.pdf Fee Determinations - Requirement to Obtain Acquisition Executive's Input.pdf More Documents & Publications Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule

90

2012 Comparison Chart: Halls of Residence at Victoria University of Wellington Hall of Residence Suitable for Places Housing style Weekly fee * Meals  

E-Print Network (OSTI)

Suitable for Places Housing style Weekly fee * Meals Electricity included in fee Internet included in fee Twin$175 Catered Yes Yes + Gym area Music room 15 free off-street car parks available. Karori--10

Frean, Marcus

91

The Big Curve: Trends in University Fees and Financing in the EU and US  

E-Print Network (OSTI)

Series Douglass and Keeling Trends in University Fees andUniversity, revised. College Board (2008). Trends in CollegePricing: 2008, Trends in Higher Education Series, College

Douglass, John Aubrey; Keeling, Ruth

2008-01-01T23:59:59.000Z

92

March 20, 2003: Last Day to Pay Fees March 28, 2003: Classes Dropped  

E-Print Network (OSTI)

be made in person at 1125 Murphy Hall and are assessed an additional $50 late fee. For more information statement, for the entire quarter. In addition, certain professional schools are authorized to charge verification (official, each copy) 5.00 Transcripts -- additional services/fees Same day Processing Service

Grether, Gregory

93

Fee Waiver and Reduction Criteria | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Fee Waiver and Reduction Criteria Fee Waiver and Reduction Criteria Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Advisory Exemptions How to Submit a FOIA Request Fee Waiver and Reduction Criteria Electronic Reading Room ISC Conventional Reading Rooms Reference Links Privacy Act Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Freedom of Information Act (FOIA) Fee Waiver and Reduction Criteria Print Text Size: A A A RSS Feeds FeedbackShare Page The FOIA generally requires that requesters pay fees for processing their requests. In accordance with 5 U.S.C 552(a)(4)(A)(iv), an agency is

94

Data:89fee917-1129-442e-b28a-9b075660489f | Open Energy Information  

Open Energy Info (EERE)

fee917-1129-442e-b28a-9b075660489f fee917-1129-442e-b28a-9b075660489f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuming County Public Pwr Dist Effective date: 2011/12/14 End date if known: Rate name: Municipal Commercial Electric Space Heating Rate Sector: Commercial Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

95

Requirements for Using and Administering Cost-plus-award-fee Contracts:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Requirements for Using and Administering Cost-plus-award-fee Contracts: Requirements for Using and Administering Cost-plus-award-fee Contracts: Pre and Post FAC 2005-37 Pre FAC 2005-37 Prior to Federal Acquisition Circular (FAC) 2005-37, which has an effective date of October 14, 2009, the Federal Acquisition Regulation (FAR) required the following in using and administering a cost-plus-award-fee contract: 1. neither a firm-fixed-price nor a fixed-priced incentive contract was appropriate; 2. the limitations on use of a cost reimbursement contract were met; 3. the supplies or services could be acquired at lower costs, and in certain instances, with improved delivery or technical performance, by relating the amount of fee to the contractor's performance; 4. it was neither feasible nor effective to use predetermined objective incentive targets for cost,

96

City of Tucson - Permit Fee Credit for Solar Energy Systems | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Tucson - Permit Fee Credit for Solar Energy Systems City of Tucson - Permit Fee Credit for Solar Energy Systems City of Tucson - Permit Fee Credit for Solar Energy Systems < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State Arizona Program Type Green Building Incentive Provider City of Tucson The City of Tucson passed Resolution No. 20193 on September 27, 2005, to encourage the installation of solar energy systems throughout the city. The resolution established a policy whereby the director of the Department of Planning and Development Services will waive the fee paid by an applicant for a permit for the installation of a qualifying solar system up to $1,000 for a single installation, or $5,000 for a subdivision or multiple project

97

Design Principles and Remaining Needs for U.S. Federal Climate Policy: Emission Fees  

Science Conference Proceedings (OSTI)

Reducing greenhouse gas emissions almost certainly requires adding a price to those activities that cause emissions. Policy makers have largely overlooked the most direct option, which is to set a price on emissions (an emission fee), and ...

Paul A. T. Higgins

2010-05-01T23:59:59.000Z

98

ISSUES REGARDING FEE STRUCTURE FOR THREE ENVIRONMENTAL MANAGEMENT CONTRACTS, CR-B-01-01  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CR-B-01-01 CR-B-01-01 AUDIT REPORT ISSUES REGARDING FEE STRUCTURE FOR THREE ENVIRONMENTAL MANAGEMENT CONTRACTS MAY 2001 U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES DEPARTMENT OF ENERGY Washington, DC 20585 May 9, 2001 MEMORANDUM FOR THE DIRECTOR, OFFICE OF MANAGEMENT AND ADMINISTRATION FROM: Phillip L. Holbrook (Signed) Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Issues Regarding Fee Structure for

99

Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site, IG-0377  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IG-1 IG-1 INFORMATION: Report on "Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site" The Secretary BACKGROUND: During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department's annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth

100

Payment Of the New Mexico Environment Department- Hazardous Waste Bureau Annual Business and Generation Fees Calendar Year 2011  

Science Conference Proceedings (OSTI)

The purpose of this letter is to transmit to the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB), the Los alamos National Laboratory (LANL) Annual Business and Generation Fees for calendar year 2011. These fees are required pursuant to the provisions of New Mexico Hazardous Waste Act, Chapter 74, Article 4, NMSA (as amended). The Laboratory's Fenton Hill Facility did not generate any hazardous waste during the entire year, and is not required to pay a fee for calendar year 2011. The enclosed fee represents the amount for a single facility owned by the Department of Energy and co-operated by the Los Alamos National Security, LLC (LANS).

Juarez, Catherine L. [Los Alamos National Laboratory

2012-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Rules and Regulations Pertaining to a User Fee System for Point Source Dischargers that Discharge Pollutants into the Waters of the State (Rhode Island)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations establish a user fee system for point source dischargers that discharge pollutants into the surface waters of the State. The funds from such fees are used by the Department of...

102

The impact of shrouded fees: evidence from a natural experiment in the Indian mutual funds market  

E-Print Network (OSTI)

We study a natural experiment in the Indian mutual funds sector that created a 22 month period in which closed-end funds were allowed to charge an arguably shrouded amortized fee whereas open-end funds were forced to charge standard entry loads. We find that allowing closed-end funds to charge the shrouded type of fee led to a proliferation of closed-end funds in the market; 45 new closed-end funds were started over this 22 month period collecting 9.1 billion $U.S, whereas only two closed-end funds were started in the 66 months prior to this period collecting.42 billion $U.S., and no closed-end funds were started in the 20 months after this period. We argue that other theoretical determinants of the closed versus open ended organizational form did not change discretely around the natural experiment and thus are unlikely to explain the sudden emergence and disappearance of closed-end funds. We find closed-end funds did not perform better in terms of raw or risk-adjusted returns. If all the investors in closed-end funds during this period had invested in the lower fee open fund variety instead they would have paid 4.25 percent less in fees over this 22 month period, equal to approximately 500 million dollars in extra fees. 1

Santosh Anagol; Hoikwang Kim

2012-01-01T23:59:59.000Z

103

City of Santa Monica - Building Permit Fee Waiver for Solar Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » City of Santa Monica - Building Permit Fee Waiver for Solar Projects City of Santa Monica - Building Permit Fee Waiver for Solar Projects < Back Eligibility Commercial Construction Installer/Contractor Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Info State California Program Type Green Building Incentive Provider City of Santa Monica In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff from the Solar Santa Monica office, the city released their [http://www.solarsantamonica.com/documents/PVSubmittalRequirement2010.pdf

104

File:Geothermal fee schedule 08-08-10.pdf | Open Energy Information  

Open Energy Info (EERE)

fee schedule 08-08-10.pdf fee schedule 08-08-10.pdf Jump to: navigation, search File File history File usage File:Geothermal fee schedule 08-08-10.pdf Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 33 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 20:19, 16 November 2012 Thumbnail for version as of 20:19, 16 November 2012 1,650 × 1,275 (33 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage There are no pages that link to this file. Retrieved from "http://en.openei.org/w/index.php?title=File:Geothermal_fee_schedule_08-08-10.pdf&oldid=537711"

105

Report on Audit of Department of Energy Management and Operating Contractor Available Fees, IG-0390  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF DEPARTMENT OF ENERGY MANAGEMENT AND OPERATING CONTRACTOR AVAILABLE FEES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative address: Department of Energy Headquarters Gopher

106

Royalties vs. upfront lump-sum fees in data communication environments  

Science Conference Proceedings (OSTI)

Mobile communications markets worldwide, today, are saturated, the number of mobile network operators (MNOs) in market is declining, mobile revenues are stagnant or falling, MNOs are becoming wireless Internet service providers, and economies of scope ... Keywords: Auction, Economies of scope, Lump-sum fee, Royalty, Spectrum

Youngsun Kwon; Buhm-Kyu Kim

2012-03-01T23:59:59.000Z

107

Data:Fee7418c-3a41-4178-b2de-9de44c35f3f4 | Open Energy Information  

Open Energy Info (EERE)

Fee7418c-3a41-4178-b2de-9de44c35f3f4 Fee7418c-3a41-4178-b2de-9de44c35f3f4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Lyndonville, Vermont (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Street Lighting (77 W LED HP without Pole) Sector: Lighting Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

108

Data:03346822-fee4-4b2f-b344-72b5185c740a | Open Energy Information  

Open Energy Info (EERE)

22-fee4-4b2f-b344-72b5185c740a 22-fee4-4b2f-b344-72b5185c740a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: San Luis Valley R E C, Inc Effective date: 2013/01/01 End date if known: Rate name: Large Power Greater than 1000 kW Secondary Metered Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

109

Data:F536be86-5808-44bb-a807-381cd4901fee | Open Energy Information  

Open Energy Info (EERE)

be86-5808-44bb-a807-381cd4901fee be86-5808-44bb-a807-381cd4901fee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Chickasaw Electric Coop, Inc Effective date: 2012/06/01 End date if known: 2012/06/30 Rate name: Industrial GSA 3-Rate 54, 55,59 Sector: Industrial Description: *GSA - 3 (1001 - 5000 KW) Source or reference: http://chickasaw.coop/Rates/rates_201206.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

110

Data:A7bca1b5-83c3-47ab-839f-ee41609fbb05 | Open Energy Information  

Open Energy Info (EERE)

bca1b5-83c3-47ab-839f-ee41609fbb05 bca1b5-83c3-47ab-839f-ee41609fbb05 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 1997/02/01 End date if known: Rate name: Unmetered Decorative Outdoor Lighting Service - 9,500 Lumens Sector: Lighting Description: Source or reference: www.rivierautilities.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

111

Data:68ab6a98-327f-4864-9d4c-51fc603fee13 | Open Energy Information  

Open Energy Info (EERE)

a98-327f-4864-9d4c-51fc603fee13 a98-327f-4864-9d4c-51fc603fee13 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeastern Power Admin Effective date: End date if known: Rate name: Wholesale Power Rate Schedule CP&L-2-B Sector: Commercial Description: Source or reference: http://199.44.84.82/files/CP&L-2-B.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

112

Effects of increasing filing fees for noncompetitive onshore oil and gas leases  

Science Conference Proceedings (OSTI)

The Government Accounting Office (GAO) examined the impact of increasing the fee charged to applicants for noncompetitive onshore oil and gas leases from $25.00 to $75.00. Interior believes the increased filing fee will: (1) reduce casual speculation and multiple filings, thereby reducing fraud potential, development delays caused by assignments, and administrative burden; and (2) generate significant additional revenue. Interior's analysis is, of necessity, based largely on conjecture, but the possibility that the positive results foreseen may not materialize to the degree projected cannot be ruled out. For example, while it is likely that the $75 fee will generate additional revenue over what was obtainable under either the $10 or $25 rate, Interior's projections of at least a million filings annually and $150 million in revenues are far from certain. GAO was also unable in the time available to determine the degree to which the problems the Department desires to overcome exist, or that they will be resolved through a fee increase. Results suggest that: reducing the number of filings is not necessarily the total or only solution to reducing the administrative burden; the casual speculator is not having that great an adverse effect on development, and in fact has certain positive aspects; and the true extent of fraud in the SOG may not be as great as initially supposed. In addition, there are possible adverse effects that may not have been fully considered. For example, the increased filing fee, when coupled with the increased rental, could adversely affect industry's exploration activities, particularly that of the smaller independent. GAO suggests, now that the increase is in effect, that the Interior Department and the Congress closely watch the results, and be prepared to take remedial action if deemed necessary.

Not Available

1982-03-19T23:59:59.000Z

113

Equity of commercial low-level radioactive waste disposal fees. Report to Congress  

SciTech Connect

In the Report accompanying the Fiscal Year 1997 Senate Energy and Water Development Appropriations Bill, the Senate Appropriations Committee directed the Department of Energy (DOE) to prepare a study of the costs of operating a low-level radioactive waste (LLW) disposal facility such as the one at Barnwell, South Carolina, and to determine whether LLW generators are paying equitable disposal fees. The disposal costs of four facilities are reviewed in this report, two operating facilities and two planned facilities. The operating facilities are located at Barnwell, South Carolina, and Richland, Washington. They are operated by Chem-Nuclear, LLC, (Chem-Nuclear), and US Ecology, Inc., (US Ecology), respectively. The planned facilities are expected to be built at Ward Valley, California, and Sierra Blanca, Texas. They will be operated by US Ecology and the State of Texas, respectively. This report found that disposal fees vary significantly among facilities for a variety of reasons. However, the information suggests that at each disposal facility, LLW generators pay equitable disposal fees.

1998-02-01T23:59:59.000Z

114

Data:72aa8b97-f6b5-4fee-bd62-cdc29548ae0b | Open Energy Information  

Open Energy Info (EERE)

f6b5-4fee-bd62-cdc29548ae0b f6b5-4fee-bd62-cdc29548ae0b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Cashton, Wisconsin (Utility Company) Effective date: 2009/02/15 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 40 kilowatts for three or more months in a consecutive 12-month period.

115

HEALTH FEE/STUDENT HEALTH INSURANCE BENEFIT SUMMARY University policy requires all students registered for six or more credit hours (three hours for each  

E-Print Network (OSTI)

fee. The health fee supports all services at Redfern Health Center and includes: Professional services of primary health care providers, psychologists, and health educators; Reduced costs on over the counter pharmaceuticals, laboratory, and X-ray services; $500 urgent care EXCESS benefit for after

Stuart, Steven J.

116

ANNEX A TO APPENDIX G, Standard Remittance Advice For Payment of Fees  

U.S. Energy Information Administration (EIA) Indexed Site

Department of Energy Department of Energy Energy Information Administration Form NWPA-830G (Revised 03/12) ANNEX A TO APPENDIX G Standard Remittance Advice For Payment of Fees OMB No: 1901-0260 Expires: 3-31-2016 Burden: 5 Hours Section 1. Identification Information: Please first read the instructions on the back. Section 2. Net Electricity Generated Calculation 1.1 Purchaser Information: Item Unit 1 Unit 2 Unit 3 Station Total 1 1.11 Name:____________________________________________ 2.1 Unit ID Code: 1.12 Address:__________________________________________

117

The impact of infrastructure-related taxes and fees on airline fares in the US and the European Union  

E-Print Network (OSTI)

The purpose of this thesis is to estimate the impact of infrastructure-related add-on taxes and fees on the direct cost of air travel in the United States and the European Union. Its scope includes domestic travel in the ...

Yamanaka, Shiro, 1975-

2005-01-01T23:59:59.000Z

118

Microsoft Word - 2008 Fee Adequacy 7-30-08 green.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RW-0593 RW-0593 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report July 2008 U.S. Department of Energy Office of Civilian Radioactive Waste Management Washington, D.C. This publication was produced by the U.S. Department of Energy Office of Civilian Radioactive Waste Management (OCRWM) For further information contact: U.S. Department of Energy Office of Civilian Radioactive Waste Management Waste Management Office, RW-9 1000 Independence Ave., S.W. Washington, DC 20585 or: U.S. Department of Energy Office of Civilian Radioactive Waste Management Office of External Affairs, RW-14 1551 Hillshire Drive Las Vegas, NV 89134 or call: Office of Civilian Radioactive Waste Management 1-800-225-6972 or visit: the OCRWM Home Page:

119

Data:B52fc314-6fee-4909-a9f8-d21e624a99cc | Open Energy Information  

Open Energy Info (EERE)

fc314-6fee-4909-a9f8-d21e624a99cc fc314-6fee-4909-a9f8-d21e624a99cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2013/07/04 End date if known: 2018/06/30 Rate name: Schedule EV-U - Commercial Public Electric Vehicle Charging Service Pilot Sector: Commercial Description: APPLICABILITY: This Schedule is applicable only for DC fast charging service provided to on-road electric vehicles at Company-operated public electric vehicle charging facilities. A maximum total of twenty-five (25) DC fast charging customer accounts (i.e., 25 utility meters) across the combined service territories of Hawaiian Electric Company, Inc., Maui Electric Company, Limited, and Hawaii Electric Light Company, Inc., will be permitted under this Schedule. The Companies may submit a request to increase the permitted maximum for the review and approval of the Hawaii Public Utilities Commission. Service under this Schedule will be available through June 30, 2018.

120

Data:Fee93627-5be3-4c60-99ef-1677c10c710e | Open Energy Information  

Open Energy Info (EERE)

Fee93627-5be3-4c60-99ef-1677c10c710e Fee93627-5be3-4c60-99ef-1677c10c710e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bay City, Michigan (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: OUTDOOR LIGHTING (Mercury Vapor - 400 watts) Sector: Lighting Description: Rate with Existing Pole(Mercury Vapor - 400 watts) Source or reference: http://www.baycitymi.org/images/Department/electric/pdf/Electric%20Service%20Rate%20Schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

1986 Federal Interim Storage fee study: a technical and economic analysis  

SciTech Connect

JAI examined alternative methods for structuring charges for federal interim storage (FIS) services and concluded that the combined interests of the Department and the users would be best served, and costs most appropriately recovered, by a two-part fee involving an Initial Payment upon execution of a contract for FIS services followed by a Final Payment upon delivery of the spent fuel to the Department. The Initial Payment would be an advance payment covering the pro rata share of preoperational costs, including (1) the capital costs of the required transfer facilities and storage area, (2) development costs, (3) government administrative costs including storage fund management, (4) impact aid payments made in accordance with Section 136(e) of the Act, and (5) module costs (i.e., storage casks, drywells or silos). The Final Payment would be made at the time of delivery of the spent fuel to the Department and would be calculated to cover the sum of the following: (1) any under- or over-estimation in the costs used to calculate the Initial Payment of the fee (including savings due to rod consolidation), and (2) the total estimated cost of operation and decommissioning of the FIS facilities (including government administrative costs, storage fund management and impact aid). The module costs were included in the Initial Payment to preclude the possible need to obtain appropriations for federal funds to support the purchase of the modules in advance of receipt of the Final Payment. Charges for the transport of spent fuel from the reactor site to FIS facilities would be separately assessed at actual cost since these will be specific to each reactor site and destination.

1986-09-01T23:59:59.000Z

122

1985 Federal Interim Storage Fee Study: a technical and economic analysis  

SciTech Connect

JAI examined alternative methods for structuring charges for FIS services and concluded that the combined interests of the Deaprtment and the users would be best served, and costs most appropriately recovered, by a two-part fee involving an Initial Payment upon execution of a contract for FIS services followed by a Final Payment upon delivery of the spent fuel to the Department. The Initial Payment would be an advance payment covering the pro rata share of preoperational costs, including (1) the capital costs of the required transfer facilities and storage area, (2) development costs, (3) government administrative costs including storage fund management, (4) impact aid payments made in accordance with section 136(e) of the Act, and (5) module costs (i.e., storage casks, drywells or silos). The Final Payment would be made at the time of delivery of the spent fuel to the Department and would be calculated to cover the sum of the following: (1) any under-or over-estimation in the costs used to calculate the Initial Payment of the fee (including savings due to rod consolidation), and (2) the total estimated cost of operation and decommissioning of the FIS facilities (including government administrative costs, storage fund management and impact aid). The module costs were included in the Initial Payment to preclude the possible need to obtain appropriations for federal funds to support the purchase of the modules in advance of receipt of the Final Payment. Charges for the transport of spent fuel from the reactor site to FIS facilities would be separately assessed at actual cost since these will be specific to each reactor site and destination.

1985-09-01T23:59:59.000Z

123

Microsoft Word - FeeAdequacyAssessmentReport-1-16-clean_FINAL_v2-cn-substantiveeditsCAFINALv1.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary of Energy Secretary of Energy Washington, DC 20565 Secretarial Detcl'lninatiou of the Adequacy of the Nuclear Waste Fund Fee Based on the attached U.S. Department of Energy Nuclear Waste Fund Fee Adequacy Report, I detenuine that neither insufficient nor excess revenues nre being collected in order to recover the costs incurred by the Federal Government that are specified in the Nuclear Waste Policy Act of 1982, as amended. Accordingly, I do not propose an adjustment to the Nuclear Waste Flmd Fee at this time. -~ rlt~V JAN 1 6 2013 Steven Chu Date Attachment This Page Intentionally Left Blank i U.S. Department of Energy Nuclear Waste Fund Fee Adequacy Assessment Report January 2013 U.S. Department of Energy Washington, D.C. This publication was produced by the U.S. Department of Energy

124

Data:Ac6ffe74-5764-4b48-8766-a1929fee6126 | Open Energy Information  

Open Energy Info (EERE)

ffe74-5764-4b48-8766-a1929fee6126 ffe74-5764-4b48-8766-a1929fee6126 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wyandotte Municipal Serv Comm Effective date: 2011/10/01 End date if known: Rate name: PRIMARY SERVICE RATE (LESS THAN 1000KW)(Time-Differentiated Meter) Sector: Commercial Description: To any customer desiring service for all power and lighting purposes served through a transformer of 500 kVA or more and when the customer furnishes, owns, installs, and maintains his own transformation facilities acceptable to WMS. Source or reference: http://www.wyan.org/assets/electric/Electric%20Rates%20October%202011.pdf

125

Data:0acb8b74-4485-4e48-bfd0-fee4784244df | Open Energy Information  

Open Energy Info (EERE)

acb8b74-4485-4e48-bfd0-fee4784244df acb8b74-4485-4e48-bfd0-fee4784244df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Grays Harbor Cnty Effective date: 2013/01/01 End date if known: Rate name: RESIDENTIAL Sector: Residential Description: This schedule is available in all territory served by the District, for electric service for single-family residential and associated purposes. Examples include: Permanent homes, mobile homes, recreational vehicles, residential outbuildings, residential swimming pools, water pumping (excluding non-commercial farm irrigation, and multiple residence water pumping greater than five horsepower.) and individually metered apartments or rental units including building hall lights, air conditioning, water heating, space heating and laundry facilities therein.

126

Data:2e38fe09-4eea-422f-920a-505fee2618bb | Open Energy Information  

Open Energy Info (EERE)

9-4eea-422f-920a-505fee2618bb 9-4eea-422f-920a-505fee2618bb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule ID Small Industrial Service - Demand Metered 35 to 499 kW Sector: Industrial Description: Applicability This schedule applies to: 1) commercial and industrial customers for general power use with a demand of 35 kW to 499 kW, and 2) other services where other Rate Schedules (other than Rate Schedules NM and SG) do not apply. This schedule is applicable on an annual basis only. Power Factor Charge, per kVAr $ 1.10

127

Data:F71e16fe-e1c6-4d99-bfd2-a79d060bb1b7 | Open Energy Information  

Open Energy Info (EERE)

fe-e1c6-4d99-bfd2-a79d060bb1b7 fe-e1c6-4d99-bfd2-a79d060bb1b7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Ohio (Utility Company) Effective date: End date if known: Rate name: Electricity Area Lighting Rates (400 MV Private Area Lighting) Sector: Commercial Description: Source or reference: http://publicutilities.columbus.gov/uploadedFiles/Public_Utilities/Document_Library/Residential_Bills_and_Payments/2011_Rates_and_Information/Electricity%20Area%20Lighting%20Rates%202011.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

128

Data:A0fee6a1-2aa1-4217-9458-cb95314b2738 | Open Energy Information  

Open Energy Info (EERE)

fee6a1-2aa1-4217-9458-cb95314b2738 fee6a1-2aa1-4217-9458-cb95314b2738 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Minnesota Power Inc Effective date: 2009/10/01 End date if known: Rate name: RIDER FOR FOND DU LAC RESERVATION BUSINESS LICENSE FEE Sector: Description: APPLICATION Applicable to billings for electric service provided within the Fond du Lac Reservation located in the southern portion of St. Louis County and the northern portion of Carlton County, Minnesota. ADJUSTMENT In accordance with the Corporate Code, Business License System and Employment Rights Law contained in the Fond du Lac Reservation Ordinance 5/84, businesses operating within the Reservation shall pay an assessment of 0.5 percent on revenues from sales within the Reservation. Therefore, there shall be added to each customer's monthly electric service bill a Fond du Lac Reservation Business License Fee assessment. The amount of the fee to be assessed shall be the applicable Assessment Rate multiplied by the Customer's bill for electric service. Compliance by Minnesota Power with the Business License System is governed by the terms of an agreement dated September 25, 1985, as amended by letter dated January 6, 1986, made with the Reservation Business Committee. Since the License Fee assessable by Minnesota Power applies retroactively to October 2, 1985, the initial Assessment Rate shall be 1.0 percent until such time as all retroactive amounts have been collected. Thereafter, the Assessment Rate shall be 0.5 percent.

129

Data:6ba370b0-9973-4fee-8afd-3cc9f097e34b | Open Energy Information  

Open Energy Info (EERE)

Data Edit with form History Facebook icon Twitter icon Data:6ba370b0-9973-4fee-8afd-3cc9f097e34b No revision has been approved for this page. It is currently under review by our...

130

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

oil inspection license fees for oil-well plugging drill andselective sales tax on oil and gas well- servicing, andSERVICES Drilling oil and gas wells Oil and gas exploration

Delucchi, Mark

2005-01-01T23:59:59.000Z

131

Data:8fd8fee9-3707-4c99-a646-5fe8054d199a | Open Energy Information  

Open Energy Info (EERE)

fd8fee9-3707-4c99-a646-5fe8054d199a fd8fee9-3707-4c99-a646-5fe8054d199a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (400W HPS-Open/Closed) - Existing Pole Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation

132

Data:7322b2fe-026b-400a-895f-ee3d34e4f43d | Open Energy Information  

Open Energy Info (EERE)

fe-026b-400a-895f-ee3d34e4f43d fe-026b-400a-895f-ee3d34e4f43d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Concord, North Carolina (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: General Service- Time of Use Sector: Commercial Description: Available only to non-residential loads with a demand greater than or equal to 100 kW during at least three months of a twelve-month period and an average annual load factor of at least 55%. Service under this Schedule should be used for a Customer with a single enterprise located entirely on a single, contiguous premise.

133

Data:95c01297-25d4-4abd-931f-7c0fee51dbbb | Open Energy Information  

Open Energy Info (EERE)

1297-25d4-4abd-931f-7c0fee51dbbb 1297-25d4-4abd-931f-7c0fee51dbbb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: KEM Electric Coop Inc Effective date: End date if known: Rate name: Grain Drying Controlled - Three Phase/Submeter Sector: Commercial Description: Available to all members who are drying agricultural crops. Type of Service This is a sub-meter service. Single phase greater than 50 kVa or three phase, 60 cycles, at secondary voltages. The Cooperative will provide sub-meter, meter socket, and C.T. equipment, and load management device necessary to measure and interrupt electric usage.

134

Data:Fee0631d-1763-440b-9014-ac4cd388a9e2 | Open Energy Information  

Open Energy Info (EERE)

Fee0631d-1763-440b-9014-ac4cd388a9e2 Fee0631d-1763-440b-9014-ac4cd388a9e2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Utility District No 2 Effective date: 2011/10/01 End date if known: Rate name: Small Commercial Single Phase Sector: Commercial Description: This schedule is applicable to SMALL commercial and other services not eligible under other rate schedules where measured demand is less than 50 kW. Commercial accounts are billed on a regular monthly cycle. Power Cost Adjustment Factor = 7% The Power Cost Adjustment is based on rate adjustments from BPA . Minimum Charge Single Phase - $ 21.00 per meter per month

135

Data:F8fee5d3-3ff9-4cb3-8745-ce6b96824719 | Open Energy Information  

Open Energy Info (EERE)

fee5d3-3ff9-4cb3-8745-ce6b96824719 fee5d3-3ff9-4cb3-8745-ce6b96824719 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2004/02/21 End date if known: Rate name: Single Phase Master Metered (Non Demand) RV Parks (400-499 local access) Sector: Residential Description: Service under this schedule is available to master-metered mobile home parks and recreational vehicle (RV) parks. The type of service provided under this schedule is single phase, at the standard voltage available for the premises to be served, supplied through one meter at one point of delivery.

136

Data:90368ef0-e63f-4683-9c8f-ee6e563cef0b | Open Energy Information  

Open Energy Info (EERE)

368ef0-e63f-4683-9c8f-ee6e563cef0b 368ef0-e63f-4683-9c8f-ee6e563cef0b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Black River Falls, Wisconsin (Utility Company) Effective date: 2010/04/15 End date if known: Rate name: Street Lighting - Ms-1 - Contributed Lights 150 W HPS (100% contributed) Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will install and maintain street lighting units. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=550 Source Parent: Comments Applicability

137

Data:D727248f-ee36-4ca8-8fb3-e9d93f575de0 | Open Energy Information  

Open Energy Info (EERE)

7248f-ee36-4ca8-8fb3-e9d93f575de0 7248f-ee36-4ca8-8fb3-e9d93f575de0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mitchell Electric Member Corp Effective date: End date if known: Rate name: SCHEDULE LLS-14 Sector: Description: AVAILABILITY Throughout the Cooperative's service area from existing lines of adequate capacity in accordance with the Service Rules and Regulations and subject to the execution of a written agreement for service between the Cooperative and the consumer. Service under this schedule is not available for temporary, standby, or breakdown service or for parallel operation.

138

Data:1fa28776-b008-449b-8dd7-8491526fee38 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:1fa28776-b008-449b-8dd7-8491526fee38 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2013/11/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 1 - RESIDENTIAL SERVICE NSS (Non-Retail) Sector: Residential Description: APPLICABLE TO THE USE OF SERVICE FOR: Residential Customers in individual private dwellings, flats or apartments, and Religious Customers utilizing service exclusively in connection with religious purposes by a corporation or association organized and conducted in good faith for religious purposes. Applicable also to use exclusively in connection with a community residence for the mentally disabled, as defined in subdivision 28, 28-a, or 28-b of section 1.03 of the mental hygiene law, provided that such residence is operated by a not-for-profit corporation and, if supervisory staff is on site 24 hours a day, that the residence provides living accommodations for 14 or fewer residents. Also applicable to any not-for-profit corporation that is a veterans' organization that owns or leases a post or hall. Flat rate Adjustments = Transition Charge+MFC

139

Data:4b09a129-5371-4f7c-9fee-f53c3d9e67b4 | Open Energy Information  

Open Energy Info (EERE)

5371-4f7c-9fee-f53c3d9e67b4 5371-4f7c-9fee-f53c3d9e67b4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Muscoda, Wisconsin (Utility Company) Effective date: 2010/10/26 End date if known: Rate name: Cp-2 Large Power Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0844 per kilowatt-hour.

140

Data:Eb91fee3-46d3-42d9-8075-dbdf640fd8b6 | Open Energy Information  

Open Energy Info (EERE)

fee3-46d3-42d9-8075-dbdf640fd8b6 fee3-46d3-42d9-8075-dbdf640fd8b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of NM Effective date: 2011/08/21 End date if known: Rate name: 20 Streetlights and Floodlights 6400 Lumen 70 Watt High Pressure Sodium Streetlight Customer Owned Sector: Lighting Description: Applicable to street lighting and floodlighting systems and under contract with any municipal corporation or other political subdivision within the State of New Mexico. Available within the incorporated limits of cities and towns and adjacent territory served by the Company in its Albuquerque, Valencia, Sandoval, Clayton, Deming, Las Vegas, East Mountain, and Santa Fe Divisions and territory contiguous thereto.

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Data:Fee5325b-2393-4aed-86b0-ccd004b1eb6f | Open Energy Information  

Open Energy Info (EERE)

Fee5325b-2393-4aed-86b0-ccd004b1eb6f Fee5325b-2393-4aed-86b0-ccd004b1eb6f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barron, Wisconsin (Utility Company) Effective date: 2009/07/15 End date if known: Rate name: Gs-2 General Service-Optional Time-of-Day Single Phase Sector: Commercial Description: Application: This rate schedule is optional to all Gs-1, General Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule. Fixed Monthly Charge includes Commitment to Community Rider: $3.00 per customer per month

142

Data:Dbe25a1e-0788-49b1-8754-82fee5bf271f | Open Energy Information  

Open Energy Info (EERE)

Dbe25a1e-0788-49b1-8754-82fee5bf271f Dbe25a1e-0788-49b1-8754-82fee5bf271f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: GS Urban-Three Phase Sector: Residential Description: Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH (Added to All Above Energy Rates) Controlled Water Heater Credit $.00736/KWH Applies to the first 1,000 KWHs each month (October-March) Source or reference: http://www.nodakelectric.com/wp-content/uploads/2011/04/General-Service-Rate-Urban1.pdf

143

Data:C5cc335b-19b8-46fe-b828-d09fee0617ec | Open Energy Information  

Open Energy Info (EERE)

35b-19b8-46fe-b828-d09fee0617ec 35b-19b8-46fe-b828-d09fee0617ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: OUTDOOR LIGHTING MV-11* 250 W Sector: Lighting Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. APPLICATION OF SCHEDULE: This schedule is applicable to any Customer for automatically operated dusk to dawn outdoor lighting supplied and operated by the Company.*Due to the U.S. Government Energy Act of 2005, after August 1, 2008, the Company will no longer install Mercury Vapor fixtures for new installations.

144

Data:F289425d-2fee-45ba-be38-9d3283bc51a9 | Open Energy Information  

Open Energy Info (EERE)

F289425d-2fee-45ba-be38-9d3283bc51a9 F289425d-2fee-45ba-be38-9d3283bc51a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate GS-FL: OPTIONAL UNMETERED GENERAL SERVICE RATE FOR SMALL FIXED LOADS - under 540 hours Sector: Commercial Description: Applicable to electric service in the Company's entire territory where secondary distribution lines exist for any fixed electric load that can be served by a standard service drop from the Company's existing secondary distribution system. For customers taking service under any or all of the provisions of this tariff schedule, this same schedule shall constitute the Company's Standard Service Offer.

145

Data:026252f1-6b41-4fee-9f3f-7cce15266aee | Open Energy Information  

Open Energy Info (EERE)

2f1-6b41-4fee-9f3f-7cce15266aee 2f1-6b41-4fee-9f3f-7cce15266aee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 7am-7pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

146

Data:51dec43f-216e-4fee-b2ac-6f68d5ad42db | Open Energy Information  

Open Energy Info (EERE)

dec43f-216e-4fee-b2ac-6f68d5ad42db dec43f-216e-4fee-b2ac-6f68d5ad42db No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Illuminating Co Effective date: 2008/11/01 End date if known: Rate name: NE Sector: Description: Availability: This rider is available to any Distributed Generating Facility on the Customer's Premises with installed nameplate capacity of 500 kilowatts or less if fueled by a Non Class I renewable energy resource, or 50 kilowatts or less if a Fossil Fuel is used. Metering: Customers electing service under this rider in conjunction with a demand-metered supplemental service rate shall be metered by two meters, one meter to measure supplemental service sold to the Customer and one meter to measure kilowatt hours purchased by the Company. Customers electing service under this rider and a non-demand metered supplemental service rate may be metered by one meter. The appropriate meter provision(s) will be provided by the Customer. The Company may install, at its own cost, time-differentiated meters for load research purposes.

147

Data:3ea0fee4-3855-46d5-8ef4-0e966af0073f | Open Energy Information  

Open Energy Info (EERE)

fee4-3855-46d5-8ef4-0e966af0073f fee4-3855-46d5-8ef4-0e966af0073f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 5,000kW Demand 8am-8pm Primary Metering and Transformer Ownership Discount (2,300-15,000 volts)with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

148

Data:B6577e2e-fee7-4b31-a4d9-1559df47d447 | Open Energy Information  

Open Energy Info (EERE)

e-fee7-4b31-a4d9-1559df47d447 e-fee7-4b31-a4d9-1559df47d447 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hartford Electric Effective date: 2005/07/01 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0452 per kilowatt-hour.

149

Data:50191a82-61be-44c0-95d9-13a0eb483fee | Open Energy Information  

Open Energy Info (EERE)

a82-61be-44c0-95d9-13a0eb483fee a82-61be-44c0-95d9-13a0eb483fee No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cedarburg Light & Water Comm Effective date: 2011/01/01 End date if known: Rate name: Small Power Optional Time-of-Day Rate - between 50kW and 200kW Demand Transformer Ownership Discount Sector: Industrial Description: "On-Peak" period: 8 a.m. to 8 p.m., Monday through Friday, excluding holidays. Customers on this or the optional time-of-day rate who are metered on the primary side receive a discount. A discount is also available for customers who own and maintain their own transformer.

150

Tuition and Fees  

Science Conference Proceedings (OSTI)

... of nature, or any other circumstance outside of the CCC's control (including but not limited to inclement weather, power outage, earthquake, snow ...

2010-10-05T23:59:59.000Z

151

Data:Fee392a9-6caf-4df1-94f3-c4ab26871a3e | Open Energy Information  

Open Energy Info (EERE)

Fee392a9-6caf-4df1-94f3-c4ab26871a3e Fee392a9-6caf-4df1-94f3-c4ab26871a3e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Louisiana Inc Effective date: 2006/01/31 End date if known: Rate name: Business Schedule - MMRA-16 (Primary voltage) Sector: Residential Description: Applicable to electric service for the total electrical requirements of master-metered residential apartment complexes where the complex owns, operates, and maintains its own distribution system and distributes electric service to individual family apartments for domestic purposes, and other uses such as central air conditioning and heating, laundry, lighting, and water heating, where all such services are provided only for the apartment complex. Such other uses may be separated from service used within the individual apartment and served on a general service rate schedule. Service hereunder is for the exclusive use of the apartment complex, for itself and its residential tenants and is not to be used for standby, resold, except as may be furnished to its tenants, if no specific charge is made therefor, and is not available to other parties within or without the apartment complex for commercial establishments. Service hereunder shall be supplied at one point of delivery and measured through one meter. Service hereunder is subject to any of Company's rider schedules that may be applicable.

152

Tax and Fee Payments by Motor-Vehicle Users for the Use of Highways, Fuels, and Vehicles: Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

oil inspection license fees for oil-well plugging drill andselective sales tax on oil and gas well- servicing, andSERVICES Drilling oil and gas wells Oil and gas exploration

Delucchi, Mark

2005-01-01T23:59:59.000Z

153

Site: Contract Name: Contractor: Contract Number: Contract Type...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Name: Contractor: Contract Number: Contract Type: Total Estimated Contract Cost: Contract Period: Minimum Fee Maximum Fee Performance Period Fee Available Total Fee Paid...

154

Sweet Lake Geopressured-geothermal Project, Magma Gulf-Technadril/DOE Amoco Fee. Volume II. Surface installations reservoir testing. Annual report, February 28, 1981-February 10, 1982  

DOE Green Energy (OSTI)

The Magma Gulf-Technadril/Department of Energy Amoco Fee No. 1 (production) and salt water disposal wells were drilled in the period from August, 1980 to February 1981. Surface facilities were designed and constructed during March-June 1981. Flow testing began in June 1981 and continued until February, 1982. The Miogypsinoides interval contains seven discrete sands in the test well. These sands have been numbered 1 to 7, beginning at the top of the sequence. Data from wireline logs and core samples suggested that the first zone to be perforated should be Sand 5. Because of its high porosity and permeability, Sand 5 was thought to contain almost 50% of the total hydraulic capacity of the well. Flow testing of Sand 5 was performed in three stages, each of which is fully described in this report. Phase I was designed as an initial clean-up flow and a reservoir confirmation test. Phase II consisted of the reservoir limit determination test and lasted 17 days. Boundaries were confirmed which suggest that the Sweet Lake reservoir is fairly narrow, with boundaries on three sides, but is open in one direction with no closure for at least 4-1/4 miles. These boundaries approximate the shape of the graben in which the test well was drilled, but may or may not be directly related to the major faults forming the graben. Phase III testing was planned to be a long-term test at commercial design rates. Although Sand 5 alone would not support such rates, long-term production was demonstrated. Additional research not supported by DOE funding was also performed during the period covered by this report. This research, consisting of mud logging, micropaleontology, organic geochemistry, core analysis, and rock mechanics, is summarized in this report.

Hoffman, K.S. (ed.)

1984-01-01T23:59:59.000Z

155

Attn: WINMEC, UCLA Registration Fee  

E-Print Network (OSTI)

Angeles, CA 90095 USA Note: Request for refund will NOT be entertained after 08/15/2004 RIFD Forum Mail

California at Los Angeles, University of

156

Introduction Tuition fees for 2012  

E-Print Network (OSTI)

Research Report Extension 2840.00 BUSA5124 Competitive Intelligence and Corporate Counterintelligence 8130 Marketing 8130.00 498.00 BUSA7072 Global Marketing 8130.00 498.00 BUSA7073 Applied Competitive Intelligence

157

WITS UNIVERSITY SCHEDULE OF FEES  

E-Print Network (OSTI)

Headquarters (HQ) and became a senior intelligence analyst within the Pacific Division, Counterintelligence (CIUpdated 5-12 John H. Beattie Senior Intelligence Officer, Naval Criminal Investigative Service John H. Beattie currently serves as the Naval Criminal Investigative Service (NCIS) Senior Intelligence

158

S. 2375: a bill to disapprove of certain deferrals of Strategic Petroleum Reserve budget authority, to authorize additional appropriations with respect to the Strategic Petroleum Reserve, and to increase oil import fees. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, April 28, 1986  

SciTech Connect

The purpose of this bill is to disapprove of certain deferrals of the Strategic Petroleum Reserve (SPR) budget authority, to authorize additional appropriations to the SPR, and to increase oil import fees. The bill authorizes $1 billion for fiscal years 1987, 88, and 89 for crude oil acquisitions for the SPR and $163 million for storage and related facility construction during 1987. It also instructs the Energy Secretary to cease production from the Naval Petroleum Reserve at Elk Hills for six months to allow the reservoir depletion to stabilize.

1986-01-01T23:59:59.000Z

159

Solid State Lighting Proficiency Testing Fees  

Science Conference Proceedings (OSTI)

Solid State Lighting Proficiency Testing Notice. April 25, 2011. *. Bookmark and Share. Contact: Timothy Rasinski 301-975-6697. ...

2011-09-21T23:59:59.000Z

160

Construction Permits and Fees (New Mexico)  

Energy.gov (U.S. Department of Energy (DOE))

Industries that wish to build or modify facilities that emit air pollutants (emissions) into the air must obtain an air quality permit prior to constructing. Thus, these permits are called...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

The University of Kansas Comprehensive Fee Schedule  

E-Print Network (OSTI)

of holds on transcripts and enrollment; referral of charges to collection agencies; and/or garnishment

Peterson, Blake R.

162

The University of Kansas Comprehensive Fee Schedule  

E-Print Network (OSTI)

, unpeeled, quartered, pit removed 1/8 teaspoon ground cinnamon Optional Garnishes: Powdered sugar Fresh mint. For Kids: If desired, sprinkle with powdered sugar through a sifter or fine mesh strainer and garnish

Peterson, Blake R.

163

The University of Kansas Comprehensive Fee Schedule  

E-Print Network (OSTI)

the physical properties of dendrimers that have garnished the most attention are molecular dimensions

Peterson, Blake R.

164

Registration policies and procedures Tuition and fees  

E-Print Network (OSTI)

. Oloomi Buygi is with the Ferdowsi University of Mashhad, Mashhad, Iran (e-mail: moloomi@um.ac.ir). Color, , and the decision variables, , are usu- ally the consumption and production at each location. Market clearing prices can be considered in formulating the expan- sion of a GenCo, such as revenue from selling energy

Amin, S. Massoud

165

OCEAN SCIENCES CENTRE USER FEE DOCUMENT  

E-Print Network (OSTI)

/Administrative Services Laboratory/Technical Services Computer Services Stockroom Animal Husbandry/Fish Health ............................................................................................................ 5 3.0 ANIMAL HUSBANDRY/FISH HEALTH SERVICES............................................. 5 3/Administrative services Laboratory/Workshop Services (also includes shuttle for graduate students, operation of communal

Oyet, Alwell

166

Student Fee Advisory Committee Orientation Handbook  

E-Print Network (OSTI)

Discovery Center at Long Marine Lab and to help fund animal care and facility costs (not currently supported are appointed for a two year term, they are given enough time to develop a significant level of expertise are elected during the spring quarter for one-year terms * The number of student members and the balance

California at Santa Cruz, University of

167

Facilities OperationsFacilities Operations Service Fee/Charge GuidelinesService Fee/Charge Guidelines  

E-Print Network (OSTI)

power, steam and cooling water; · Production and distribution of potable water; · Collection the Storrs and Depot campuses, including: · Generation and distribution of electrical power, emergency backup of distribution/collection systems; · Maintenance of campus hardscape, including roads and sidewalks. DRAFT #12

Holsinger, Kent

168

UNIVERSITY OF STRATHCLYDE FEE LEVELS 2014/2015  

E-Print Network (OSTI)

,200 MSc/PGDip/PGCert Business Analysis and Consulting £7,200 £7,200 MSc/PGDip Management Information Management £17,000 £17,000 MSc/PGDip Finance £7,200 £7,200 MSc Global Energy Management £13,000 £13,000 MSc Marketing £12,000 £12,000 MSc/PGDip Marketing £12,000 £12,000 MSc/PGDip Operational Research £7,200 £7

Strathclyde, University of

169

UNIVERSITY OF STRATHCLYDE FEE LEVELS 2014/2015  

E-Print Network (OSTI)

/PGDip/PGCert Business Analysis and Consulting £13,200 MSc/PGDip Management Information Technology Systems £14,000 MSc Global Energy Management £17,000 MSc/PGDip Human Resource Management £13,200 MSc/PGDip International/PGDip/PGCert International Marketing £14,000 MSc/PGDip Marketing £14,000 MSc/PGDip Operational Research £13,200 Part

Strathclyde, University of

170

THE UNIVERSITY OF BRITISH COLUMBIA Saying `No' To Higher Fees  

E-Print Network (OSTI)

Difference(cm -1 ) 109876543210 Energy (?10 3 cm -1 ) Majewski, 1994 (Watson) Neale, 1995 (Tennyson) Dinelli, 1995 - Jim Watson - Alexander Alijah - Jonathon Tennyson - Ralph Jaquet Support Staff: - Dave Smith - Gerry

Farrell, Anthony P.

171

FAIR: Fee Arbitrated Incentive Architecture in Wireless Ad Hoc Networks  

E-Print Network (OSTI)

the average price in the estimation table for all destinations. It periodically calculates the trend mechanisms to configure itself to the changing demands of the nodes, users, and network conditions. Price, leading to potentially selfish behavior. In fact, given that node's resources (energy, processor

Li, Baochun

172

Alignment of fee Crystals due to Transient Electric Fields  

Science Conference Proceedings (OSTI)

The alignment of columnar ice crystals due to the electric field surrounding a moving charged object, such as an aircraft, is modeled. The model allows the conditions of charge, velocity, ambient electric field, and size and shape of crystal to ...

D. A. Burrows; J. L. Stith

1986-06-01T23:59:59.000Z

173

City of Tucson - Permit Fee Credit for Solar Energy Systems ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commercial Residential Savings For Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating Water Heating Program Information Arizona...

174

Regional parking fee : a potential funding source for transit?  

E-Print Network (OSTI)

From a regional mobility perspective, Chicagoland is in serious trouble. The current Chicago Transit Authority (CTA) funding shortfall is just the most recent evidence of major flaws in the region's transit governance and ...

Misiak, Jodie Mercer

2005-01-01T23:59:59.000Z

175

Microsoft Word - FY12 Fee Des.doc  

National Nuclear Security Administration (NNSA)

REQUIREMENTS FOR DOE NUCLEAR FACILITIES 06-01-11 IB 430.1 Rev 0 LIFE CYCLE ASSET MANAGEMENT 08-11-98 IB 430.1B-100 Rev 0 REAL PROPERTY ASSET MANAGEMENT 08-11-98 IB 433.1-126...

176

Local Option - Building Permit Fee Waivers for Renewable Energy...  

Open Energy Info (EERE)

Low-Income Residential, Multi-Family Residential, Nonprofit, Residential, Schools, State Government, Tribal Government Eligible Technologies Biomass, Fuel Cells, Fuel Cells...

177

Microsoft Word - KCP Contract Mod M120.doc  

National Nuclear Security Administration (NNSA)

20 20 Contract No. DE-AC04-01AL66850 Page 2 of 56 1. Section B.2, ESTIMATED COST, MAXIMUM AVAILABLE FEE, AND AVAILABLE FEE, is amended to read as follows: B.2 ESTIMATED COST, MAXIMUM AVAILABLE FEE, AND AVAILABLE FEE (a) Paragraphs (b) through (c), below, set forth the Estimated Cost, Maximum Available Fee, and Available Fee for the Contract term(s). At the start of each fiscal year, these paragraphs will be reviewed to include the appropriate figures for the upcoming fiscal year. (b) The Estimated Cost of the specified Contract periods, exclusive of the Contractor's Basic Fee, if any, and Award Fee is set forth below: Contract Period Estimated Costs January 1, 2001, through September 30, 2001 $277,000,000 October 1, 2001, through September 30, 2002 $443,448,000

178

Microsoft Word - KCP Contract Mod M107.doc  

National Nuclear Security Administration (NNSA)

07 07 Contract No. DE-AC04-01AL66850 Page 2 of 65 1. Section B.2, ESTIMATED COST, MAXIMUM AVAILABLE FEE, AND AVAILABLE FEE, is amended to read as follows: B.2 ESTIMATED COST, MAXIMUM AVAILABLE FEE, AND AVAILABLE FEE (a) Paragraphs (b) through (c), below, set forth the Estimated Cost, Maximum Available Fee, and Available Fee for the Contract term(s). At the start of each fiscal year, these paragraphs will be reviewed to include the appropriate figures for the upcoming fiscal year. (b) The Estimated Cost of the specified Contract periods, exclusive of the Contractor's Basic Fee, if any, and Award Fee is set forth below: Contract Period Estimated Costs January 1, 2001, through September 30, 2001 $277,000,000 October 1, 2001, through September 30, 2002 $443,448,000

179

Maine Regional High School Science Bowl | U.S. DOE Office of...  

Office of Science (SC) Website

2014 Maximum Number of Teams: 20 Maximum Number of Teams per School: 2 Registration Fee: NA Regional Geographic Information: Maine Team Approval Process Teams are approved on a...

180

Contractor: Contract Number: Contract Type: Total Estimated  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Number: Number: Contract Type: Total Estimated Contract Cost: Performance Period Total Fee Earned FY2008 $2,550,203 FY2009 $39,646,446 FY2010 $64,874,187 FY2011 $66,253,207 FY2012 $41,492,503 FY2013 $0 FY2014 FY2015 FY2016 FY2017 FY2018 Cumulative Fee Earned $214,816,546 Fee Available $2,550,203 Minimum Fee $77,931,569 $69,660,249 Savannah River Nuclear Solutions LLC $458,687,779 $0 Maximum Fee Fee Information $88,851,963 EM Contractor Fee Site: Savannah River Site Office, Aiken, SC Contract Name: Management & Operating Contract September 2013 DE-AC09-08SR22470

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Networks, deregulation, and risk : the politics of critical infrastructure protection  

E-Print Network (OSTI)

1984. -- -- --. Postal Rate and Fee Increases, 1971. DocketPRC, -- -- --. Postal Rate and Fee Increases, 1973. DocketPRC, -- -- --. Postal Rate and Fee Increases, 1975. Docket

Ellis, Ryan Nelson

2011-01-01T23:59:59.000Z

182

RELOCATION ASSISTANCE  

NLE Websites -- All DOE Office Websites (Extended Search)

charges * Impact fees * Inspection fees if customarily paid by buyer (structural, pest, asbestos, radon gas, etc.) * Legal, attorney, notary fees (not including cost of...

183

Fees are subject to change. See studyguide.au.dk *PLACE OF STUDY  

E-Print Network (OSTI)

of the few oil-exporting regions in Europe, and there are therefore a number of positions in the oil industry.au.dk/geophysics Earthquakes, groundwater and hydrocarbons are not only concerns for us all, but also primary focal areas, lithosphere geo- physics, oil and geothermal energy-related geophysics, and geodynam- ics and inverse

184

Microsoft Word - FeeAdequacyAssessmentReport-1-16-clean_FINAL...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

... 20 2.4.2 U.S. Department of Energy, Energy Information Administration... 21 2.4.3 Ibbotson Associates...

185

Sample Invoice Cost & No Fee UT-B Contracts Div August 2009  

E-Print Network (OSTI)

SHIPPED VIA CUSTOMER NUMBER TERMS NET DAYS COST ELEMENT DESCRIPTION CURRENT COSTS CUMULATIVE COSTS DIRECT for the Department of Energy COMMENTS OR SPECIAL INSTRUCTIONS: SUBCONTRACT NUMBER BILLING PERIOD Begin/End Date: Company Name Address 1 Address 2 City, ST ZIP Code Street Address City, ST ZIP Code Name, Phone, E

186

Sample Invoice Cost & Fee UT-B Contracts Div August 2009  

E-Print Network (OSTI)

SHIPPED VIA CUSTOMER NUMBER TERMS NET DAYS COST ELEMENT DESCRIPTION CURRENT COSTS CUMULATIVE COSTS DIRECT for the Department of Energy COMMENTS OR SPECIAL INSTRUCTIONS: SUBCONTRACT NUMBER BILLING PERIOD Begin/End Date: Company Name Address 1 Address 2 City, ST ZIP Code Street Address City, ST ZIP Code Name, Phone, E

187

ABOUT CALENDAR FEES ENROLLMENT RECORDS University Home MyUCSC People Calendars A-Z Index  

E-Print Network (OSTI)

. Paul, Jr. Art Kirk Willis History 1999 Noel Fallows Romance Languages (postponed until end of headship Geography Bernard Dauenhauer Philosophy & Religion Paul Edmonston Art Mary Legler Music William Free English Art Frank K. Gibson Political Science Richard Hill Chemistry Charles Patterson English Warren Spencer

California at Santa Cruz, University of

188

SITE VISITS IN ROME 2011 (8:30 AM 1:00 PM) *ENTRANCE FEE  

E-Print Network (OSTI)

in Vincoli, *Capitoline Museum, *Crypta Balbi, 7:00 PM Trastevere Walk 7/01 Saturday *Bus Trip to Roman

Tsien, Roger Y.

189

How to Write a Technical Report at the DCGI, FEE, Czech Technical University in Prague, CZ  

E-Print Network (OSTI)

Vlastimil Havran, Jir´i Bittner, Pavel Slav´ik, Jir´i Z´ara CS­TR­DCGI­2011­1 June 2011 Technical Report Series of DCGI, Volume 1, Year 2011 Department of Computer Graphics and Interaction Czech Technical quality before releasing it to the public. The publishing of these reports is planned to be electronic

Havran, Vlastimil

190

The Big Curve: Trends in University Fees and Financing in the EU and US  

E-Print Network (OSTI)

more a part of the higher education landscape in Europe, andNicholas (2004). "Higher Education Funding," Oxford Review1980). The Costs of Higher Education, Carnegie Council for

Douglass, John Aubrey; Keeling, Ruth

2008-01-01T23:59:59.000Z

191

TECHNOLOGY CONSIDERATIONS FOR THE IMPLEMENTATION OF A STATEWIDE ROAD USER FEE SYSTEM  

E-Print Network (OSTI)

gasoline tax and introduce some of the issues that must be addressed with these technologies. While) Report 377, Alternatives to Motor Fuel Taxes for Financing Surface Transportation Improvements, set out. Among the major conclusions were: 1. Motor fuel taxes will remain important components of state

Bertini, Robert L.

192

Equity Evaluation of Vehicle Miles Traveled Fees in Texas Lisa Larsen, EIT  

E-Print Network (OSTI)

advanced technology vehicles (plug-in hybrids, extended range electric vehicles or hydrogen ICEVs+ vehicles are plug-in hybrid or hydrogen internal combustion engine vehicles Under the CARB zero to station owners Government could offer incentives such as investment tax credits to offset a significant

Burris, Mark W.

193

MAXIMUM HUMIDITY INDICATOR  

SciTech Connect

Moisture-sensitive systems to measure and indicate the maximum level of humidity exposure are discussed. A chemical indicator utilizing deliquescent salts and water-soluble dyes provides an irreversible color change at discrete levels of relative humidity. To provide indication of the time at which the exposure occurs, a circuit employing a resistive-type sensor was developed. A small, commercially available sensor is used in a portable probe to detect humidity leaks into controlled areas.

Abel, W B

1974-10-01T23:59:59.000Z

194

MaximumLetThrough.PDF  

NLE Websites -- All DOE Office Websites (Extended Search)

9 9 Maximum Let-Through Currents in the APS Storage Ring Quadrupole, Sextupole, and Corrector Magnets J. Carwardine, D. McGhee, G. Markovich May 18, 1999 Abstract Limits are described for the maximum magnet currents, under specified fault conditions, for the storage ring quadrupole, sextupole, and corrector magnets. Introduction In computing the maximum let-through current for the magnets for the storage ring, several factors must be considered. In general, the maximum current likely to occur even under fault conditions is less than the maximum theoretical DC current given the magnet resistance and the maximum available DC voltage. The first level of protection against magnet current overloads is the over-current interlock that is built into the converter electronics package. The threshold is set to approximately 110% of

195

Investigation and evaluation of geopressured-geothermal wells. Final report, Tenneco Fee N No. 1 Well Terrebonne Paris, Louisiana  

DOE Green Energy (OSTI)

The reservoir conditions that led to the choice of this well as the fifth well of opportunity are described as well as the attempts to complete the well for high-volume brine production. Individual opinions concerning underlying and conributing causes for the liner failure which aborted the completion attempt are included. (MHR)

Dobson, R.J.; Hartsock, J.H.; McCoy, R.L.; Rodgers, J.A.

1980-09-01T23:59:59.000Z

196

A New Cycle of UK Higher Education Reforms: New Labour and New Fees May Foster Mission Differentiation  

E-Print Network (OSTI)

cshe/ A NEW CYCLE OF UK HIGHER EDUCATION REFORMS: NEW LABOURfor Studies in Higher Education, UC Berkeley Copyright 2004in system building in higher education in the United Kingdom

Douglass, John Aubrey

2004-01-01T23:59:59.000Z

197

University of the Witwatersrand, Johannesburg 03 January 2012 Wits Student Finance: Fees Booklet Data Feed Page 1 of 138  

E-Print Network (OSTI)

to all investigative, counterintelligence, and counterterrorism activities within the areaCoy provided Staff Counterintelligence Officer (SCIO) support to Commander, U.S. Naval Forces Europe in London London, Connecticut (1991-99); and the NCISHQ Counterintelligence Directorate, Washington, D.C. (1999

198

Removal to Maximum Extent Practical  

Energy.gov (U.S. Department of Energy (DOE))

Summary Notes from 1 November 2007 Generic Technical Issue Discussion on Removal of Highly Radioactive Radionuclides/Key Radionuclides to the Maximum Extent Practical

199

2 Spring 1999 Online enrollment debuts on URSA  

E-Print Network (OSTI)

of enrolled units. They do not include additional course or unit-based fees such as the IEI Fee or course complete and accurate information that must be submitted by the stated deadlines. For additional deadline not include additional course or unit-based fees such as the IEI Fee or course materials fees that may

Grether, Gregory

200

Puget Sound Energy - Commercial New Construction Energy Efficiency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

incremental cost of individual measures '''Building Commissioning:''' Up to 0.50 per square foot with maximum of 50% of third-party commissioning agent fee Provider Puget Sound...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

ORISE: Health Physics in Radiation Emergencies | REAC/TS Continuing...  

NLE Websites -- All DOE Office Websites (Extended Search)

Health Physics in Radiation Emergencies Dates Scheduled Register Online February 24-28, 2014 June 9-13, 2014 Fee: 200 Maximum enrollment: 24 32 hours American Academy of Health...

202

ORISE: Radiation Emergency Medicine - Continuing Medical Education...  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiation Emergency Medicine Dates Scheduled Register Online February 4-7, 2014 March 18-21, 2014 April 29-May 2, 2014 June 3-6, 2014 August 12-15, 2014 Fee: 175 Maximum...

203

The Maximum Intensity of Hurricanes  

Science Conference Proceedings (OSTI)

An exact equation governing the maximum possible pressure fall in steady tropical cyclones is developed, accounting for the full effects of gaseous and condensed water on density and thermodynamics. The equation is also derived from Carnot's ...

Kerry A. Emanuel

1988-04-01T23:59:59.000Z

204

Hardness of Maximum Constraint Satisfaction.  

E-Print Network (OSTI)

??We show optimal (up to a constant factor) NP-hardness for maximum constraint satisfaction problem with k variables per constraint (Max-k-CSP), whenever k is larger than (more)

Chan, Siu On

2013-01-01T23:59:59.000Z

205

2011 Actinide Separations Conference  

NLE Websites -- All DOE Office Websites (Extended Search)

15th. Click here to access the Registration Form. Conference Fee: 300.00 (includes Banquet)* Student Fee 160.00 (includes Banquet)* Banquet Fee for spouse or guest: 45.00 per...

206

BWXT/B&W Pantex Contract No. DE-AC04-00AL66620 FY BUDGET  

National Nuclear Security Administration (NNSA)

BWXTB&W Pantex Contract No. DE-AC04-00AL66620 FY BUDGET (LAB TABLE) ESTIMATED COST AWARD FEE AVAILABLE WFO FEE AVAILABLE (Estimated) AVAILABLE FEE FROM OTHER REIMBURSABLE WORK...

207

Microsoft Word - DE-RW0000005.rtf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

QA QA Contract No.: DE-RW0000005 QA:QA PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS Contract No.: DE-RW0000005 QA:QA i B- PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS TABLE OF CONTENTS B.1 SERVICE BEING ACQUIRED............................................................................. 1 B.2 OBLIGATION OF FUNDS AND FINANCIAL LIMITATIONS......................... 1 B.3 TRANSITION COST, CONTRACT TYPE, ESTIMATED COSTS, MAXIMUM AVAILABLE FEE, AND TOTAL AVIALABLE FEE......................................... 1 B.4 ALLOWABILITY OF SUBCONTRACTOR FEE................................................

208

Maximum order of planar digraphs  

Science Conference Proceedings (OSTI)

We consider the degree/diameter problem for directed planar graphs. We show that planar digraphs with diameter 2 and maximum out-degree and in-degree d, d ? 41, cannot have more than 2d vertices. We show that 2d ...

Rinovia Simanjuntak; Mirka Miller

2003-09-01T23:59:59.000Z

209

Extreme Maximum Land Surface Temperatures  

Science Conference Proceedings (OSTI)

There are numerous reports in the literature of observations of land surface temperatures. Some of these, almost all made in situ, reveal maximum values in the 5070C range, with a few, made in desert regions, near 80C. Consideration of a ...

J. R. Garratt

1992-09-01T23:59:59.000Z

210

9th Annual DOE LSOW - Vendor Information  

Science Conference Proceedings (OSTI)

9 th Annual DOE Laser Safety Officer Workshop. Exhibitor Information. ... Fees Vendors are to contact Michael Woods (Co-Chair) for fee information. ...

2013-04-23T23:59:59.000Z

211

Department of Energy Management and Operating Contractor Available...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Management and Operating Contractor Available Fees, IG-0390 Department of Energy Management and Operating Contractor Available Fees, IG-0390 ig-0390.pdf More...

212

June 14, 2013  

Science Conference Proceedings (OSTI)

State/Province: ______. Zip/Postal Code: : Telephone: Fax: E-mail: REGISTRATION FEE. Registration fee includes technical sessions, exhibition, welcome.

213

The 2nd International Congress on 3D Materials Science 2014 The ...  

Science Conference Proceedings (OSTI)

State/Province: ______. Zip/Postal Code: : Telephone: Fax: E-mail: REGISTRATION FEE. Registration fee includes technical sessions, exhibition, welcome.

214

Registration Form Now Available  

Science Conference Proceedings (OSTI)

Jun 4, 2013 ... Zip/Postal Code: : Telephone: Fax: E-mail: REGISTRATION FEE. Full congress registration fee includes technical sessions, exhibition, welcome.

215

Advance Registration Deadline: May 17, 2013  

Science Conference Proceedings (OSTI)

May 17, 2013 ... State/Province: ______. Zip/Postal Code: : Telephone: Fax: E-mail: REGISTRATION FEE. Fee includes registration, course materials, lunches,...

216

SR0008  

NLE Websites -- All DOE Office Websites (Extended Search)

Wachenhut Receives Award Fee Flag Ribbon Art Note to Editors and News Directors The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut...

217

SR-03-04  

NLE Websites -- All DOE Office Websites (Extended Search)

Office Manager has determined the award fee amount of the Savannah River Site security contractor, Wackenhut Services Inc.-Savannah River Site. The Award Fee Determination...

218

SR0018  

NLE Websites -- All DOE Office Websites (Extended Search)

Rick Ford (803) 725-2889 Wackenhut Receives Award Fee Flag Ribbon Graphic The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services,...

219

San Francisco's Public School Facilities as Public Assets: A Shared Understanding and Policy Recommendations for the Community Use of Schools  

E-Print Network (OSTI)

Tier Three: Community Users Facilities use fee includesFully Loaded - Private Users Facilities use fee includescollected about facility users and uses and create a

Vincent, Jeffrey M; Filardo, Mary; Klein, Jordan; McKoy, Deborah L

2010-01-01T23:59:59.000Z

220

Solar | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

cost. October 16, 2013 City of Santa Monica - Building Permit Fee Waiver for Solar Projects In early 2002, the City of Santa Monica began waiving building permit fees...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Feasibility of Achieving a Zero-Net-Energy, Zero-Net-Cost Homes  

E-Print Network (OSTI)

purchasingratesfornetmetering,inter?tiefees,variabletothegrid,includingnetmetering,timeofusepricing,purchasingratesfornetmetering,intertiefees,peak

Al-Beaini, S.

2010-01-01T23:59:59.000Z

222

Maximum Building Energy Efficiency Research Laboratory secures...  

NLE Websites -- All DOE Office Websites (Extended Search)

Design Network - Maximum Building Energy Efficiency Research Laboratory secures LEED Gold July 01, 2013 The recently completed 14.3m Maximum Building Energy Efficiency...

223

Maximum entropy principal for transportation  

SciTech Connect

In this work we deal with modeling of the transportation phenomenon for use in the transportation planning process and policy-impact studies. The model developed is based on the dependence concept, i.e., the notion that the probability of a trip starting at origin i is dependent on the probability of a trip ending at destination j given that the factors (such as travel time, cost, etc.) which affect travel between origin i and destination j assume some specific values. The derivation of the solution of the model employs the maximum entropy principle combining a priori multinomial distribution with a trip utility concept. This model is utilized to forecast trip distributions under a variety of policy changes and scenarios. The dependence coefficients are obtained from a regression equation where the functional form is derived based on conditional probability and perception of factors from experimental psychology. The dependence coefficients encode all the information that was previously encoded in the form of constraints. In addition, the dependence coefficients encode information that cannot be expressed in the form of constraints for practical reasons, namely, computational tractability. The equivalence between the standard formulation (i.e., objective function with constraints) and the dependence formulation (i.e., without constraints) is demonstrated. The parameters of the dependence-based trip-distribution model are estimated, and the model is also validated using commercial air travel data in the U.S. In addition, policy impact analyses (such as allowance of supersonic flights inside the U.S. and user surcharge at noise-impacted airports) on air travel are performed.

Bilich, F. [University of Brasilia (Brazil); Da Silva, R. [National Research Council (Brazil)

2008-11-06T23:59:59.000Z

224

Spring 2004 Schedule of ClassesAA RR CC HH II VV AA LL EE DD II TT II OO NN  

E-Print Network (OSTI)

Hall and are assessed an additional $50 late fee. For more information on paying fees, see "Billing are required to pay the course materials fee, which is billed through BAR, for the entire quarter. In addition.00 Transcripts--additional services/fees Same-day Processing Service (per addressee) Special handling Special

Grether, Gregory

225

2 1998-99 Annual Schedule of Classes Bruin Direct now required for credit balance refunds  

E-Print Network (OSTI)

not include additional course or unit-based fees such as the Instructional Enhancement Initiative (IEI) Fee that must be submitted by the stated deadlines. For additional deadline informa- tion, see the Ashe Center of enrolled units. They do not include additional course or unit-based fees such as the IEI Fee or course

Grether, Gregory

226

TMS 2012: Meeting Registration  

Science Conference Proceedings (OSTI)

*Organizations interested in group discount information should contact: Margie Castello: castello@tms.org. Registration Fees...

227

Optical Radiation  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Optical Radiation Measurements. Fees for services are located directly below the technical contacts ...

2013-04-09T23:59:59.000Z

228

Ionizing Radiation  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Ionizing Radiation Measurements. Fees for services are located directly below the technical contacts ...

2013-04-09T23:59:59.000Z

229

Forensic Database Firearms and Toolmarks Table  

Science Conference Proceedings (OSTI)

Firearms & Toolmarks. Name. Subdiscipline. Maintained By. Overview & Contents. Access & Fees. Collection Method. Evidence Type. POC. ...

2013-06-06T23:59:59.000Z

230

Forensic Database Fire Explosives Table  

Science Conference Proceedings (OSTI)

Fire & Explosives. Name. Subdiscipline. Maintained By. Overview & Contents. Access & Fees. Collection Method. Evidence Type. POC. ...

2013-06-06T23:59:59.000Z

231

Maximum Urban Heat Island Intensity in Seoul  

Science Conference Proceedings (OSTI)

The maximum urban heat island (UHI) intensity in Seoul, Korea, is investigated using data measured at two meteorological observatories (an urban site and a rural site) during the period of 197396. The average maximum UHI is weakest in summer and ...

Yeon-Hee Kim; Jong-Jin Baik

2002-06-01T23:59:59.000Z

232

Data:Fee420f7-06b2-414a-9a96-7312c0b82aa7 | Open Energy Information  

Open Energy Info (EERE)

-06b2-414a-9a96-7312c0b82aa7 -06b2-414a-9a96-7312c0b82aa7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 250 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

233

Data:Fee42ed8-81fe-47cd-bb38-7860b5a4b8a0 | Open Energy Information  

Open Energy Info (EERE)

ed8-81fe-47cd-bb38-7860b5a4b8a0 ed8-81fe-47cd-bb38-7860b5a4b8a0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Belmont, Wisconsin (Utility Company) Effective date: 2005/01/21 End date if known: Rate name: SL-1 Security Lighting: 100 W HPS Sector: Lighting Description: Available to customers within the utility's service territory for security and/or yard lighting. Commitment to Community Program Rider: Sl-1 Security Lighting 2.0% of the total electric bill Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=440 Source Parent: Comments Applicability

234

Data:388dc4fe-e882-4796-8812-e2f54f80c623 | Open Energy Information  

Open Energy Info (EERE)

e882-4796-8812-e2f54f80c623 e882-4796-8812-e2f54f80c623 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Ms-1 Street and Security Lighting Service Overhead Street 150 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

235

Data:06162ffb-be5d-4f91-bd33-42977fee32d7 | Open Energy Information  

Open Energy Info (EERE)

(Utility Company) Effective date: 20100326 End date if known: Rate name: Cp-1 Small Power Service Primary Metering and Transformer Ownership Discount with Parallel...

236

Elk's Lodge All buffet menu requests for guest counts less than 20, will have a $25.00 below minimum fee ap-  

E-Print Network (OSTI)

Baked Red Potato Bar with Gourmet Topping to Include Sour Cream, Shredded Cheese, Chives, Bacon Bits Sauce 1 Platter serves 100 pieces - $125.00 Buffalo Wings with Ranch and Bleu Cheese Dressings 1 Platter

Taylor, Jerry

237

Geopressured-geothermal drilling and testing plan: Magma Gulf/Technadril-Dept. of Energy MGT-DOE AMOCO Fee No. 1 well, Cameron Parish, Lousiana  

DOE Green Energy (OSTI)

The following topics are covered: generalized site activities, occupational health and safety, drilling operations, production testing, environmental assessment and monitoring plan, permits, program management, reporting, and schedule. (MHR)

Not Available

1980-07-01T23:59:59.000Z

238

Data:94f0fee4-ebcb-41e0-b5b4-ddfc426fc5a1 | Open Energy Information  

Open Energy Info (EERE)

source History View New Pages Recent Changes All Special Pages Semantic SearchQuerying Get Involved Help Apps Datasets Community Login | Sign Up Search Data Edit History Facebook...

239

MyUCSC : Info For Faculty/Staff : FAQ : Announcements : Contact Us Publications and Scheduling : Enrollment : Fees : Transcripts : Special Programs : Graduation  

E-Print Network (OSTI)

believes someone else will accept it tomorrow. And so on. If there were a known end-point to history it helps them do business with each other. It is the oil that lubricates the economic machine sparked some of the worst conflicts in history, so the subject of money has led to some of the fiercest

California at Santa Cruz, University of

240

Data:5a12fd2c-5fee-4c0a-ba15-4dcc82758bec | Open Energy Information  

Open Energy Info (EERE)

Lighting Description: Outdoor Lighting service to individual consumers. 100 W Metered High Pressure Sodium. Source or reference: Rate Binder 7 (Illinois State University)...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

STRAWBERRY ISLAND PHASE III EROSION CONTROL AND WETLAND HABITAT RESTORATION: A CASE STUDY IN THE SUCCESSFUL APPLICATION OF IN-LIEU FEE MITIGATION  

E-Print Network (OSTI)

locates municipal water intakes beneath it. The Strawberrybelow: A municipal water intake structure is located

Spierto, Timothy J.; Lazazzero, Sarah A.; Nelson, Patricia L.

2003-01-01T23:59:59.000Z

242

Sweet Lake geopressured-geothermal project, Magma Gulf-Technadril/DOE Amoco fee. Volume III. Final report. Annual report, February 1982-March 1985  

DOE Green Energy (OSTI)

This report presents the results of the testing of Sand 3 (15,245 to 15,280 feet in depth) which occurred from November 1983 to March 1984 and evaluates these new data in comparison to results from the testing of Sand 5 (15,385 to 15,415 feet in depth) which occurred from June 1981 to February 1982. It also describes the reworking of the production and salt water disposal wells preparatory to the Sand 3 testing as well as the plug and abandon procedures requested to terminate the project. The volume contains two parts: Part 1 includes the text and accompanying plates, figures and tables; Part 2 consists of the appendixes including auxiliary reports and tabulations.

Durham, C.O. Jr.; O'Brien, F.D.; Rodgers, R.W. (eds.) [eds.

1985-01-01T23:59:59.000Z

243

Data:73bda2c4-5fee-4777-9c02-2fbe4db4bb76 | Open Energy Information  

Open Energy Info (EERE)

Rate name: Residential Rate: Emmonak Village Sector: Residential Description: For 1-500 kWh consumed: Rate ( .30 + Cost of Fuel) - (PCE Adjustment) For 501-700 kWh consumed:...

244

Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are  

E-Print Network (OSTI)

Permission to make digital or hard copies of all or part of this work for personal or classroom use accesses different parts of the database. Figure 2 compares the time breakdown of a conventional it also ensures that transactions acquire proper intention locks, and performs deadlock prevention

245

Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies  

E-Print Network (OSTI)

Permission to make digital or hard copies of all or part of this work for personal or classroom use Point Model: a user has repeatedly acquired the shown crosshairs using finger postures ranging from 90 than capacitive sensing. INTRODUCTION Acquiring a small target on a touch screen is error prone. We can

Baudisch, Patrick

246

Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are  

E-Print Network (OSTI)

Permission to make digital or hard copies of all or part of this work for personal or classroom use is notoriously hard and error-prone, and lock- based abstractions do not lend themselves well to composition. We importantly, finding such an interleaving is NP-hard [6] and can be implemented with an exponential number

Palsberg, Jens

247

Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are  

E-Print Network (OSTI)

Permission to make digital or hard copies of all or part of this work for personal or classroom use to the three parts of Figure 7, except that we do not include a hard disk since we presume that many future on technology. Application trends analysis is not a common part of the computer design process. We utilized

Paul, JoAnn M.

248

The Maximum Potential Intensity of Tropical Cyclones  

Science Conference Proceedings (OSTI)

A thermodynamic approach to estimating maximum potential intensity (MPI) of tropical cyclones is described and compared with observations and previous studies. The approach requires an atmospheric temperature sounding, SST, and surface pressure; ...

Greg J. Holland

1997-11-01T23:59:59.000Z

249

Maximum Likelihood Ensemble Filter: Theoretical Aspects  

Science Conference Proceedings (OSTI)

A new ensemble-based data assimilation method, named the maximum likelihood ensemble filter (MLEF), is presented. The analysis solution maximizes the likelihood of the posterior probability distribution, obtained by minimization of a cost ...

Milija Zupanski

2005-06-01T23:59:59.000Z

250

Document  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Department of Energy 970.5223-1 (End of clause) 970.5215-5 Limitation on fee. As prescribed in 48 CFR 970.1504-5(e), the contracting officer shall insert the following provision: LIMITATION ON FEE (DEC 2000) (a) For the purpose of this solicitation, fee amounts shall not exceed the total available fee allowed by the fee policy at 48 CFR 970.1504-1-1, or as specifically stated else- where in the solicitation. (b) The Government reserves the unilateral right, in the event an offeror's proposal is se- lected for award, to limit: fixed fee to not ex- ceed an amount established pursuant to 48 CFR 970.1504-1-5; and total available fee to not exceed an amount established pursuant to 48 CFR 970.1504-1-9; or fixed fee or total available fee to an amount as specifically

251

Modeling Maximum Hail Size in Alberta Thunderstorms  

Science Conference Proceedings (OSTI)

A one-dimensional steady-state cloud model was combined with a time-dependent hail growth model to predict the maximum hailstone size on the ground. Model runs were based on 160 proximity soundings recorded within the Alberta Hail Project area ...

Julian C. Brimelow; Gerhard W. Reuter; Eugene R. Poolman

2002-10-01T23:59:59.000Z

252

Maximum Entropy Production in Climate Theory  

Science Conference Proceedings (OSTI)

R. D. Lorenz et al. claim that recent data on Mars and Titan show that planetary atmospheres are in unconstrained states of maximum entropy production (MEP). Their model as it applies to Venus, Earth, Mars, and Titan is reexamined, and it is ...

Richard Goody

2007-07-01T23:59:59.000Z

253

Integrating Correlated Bayesian Networks Using Maximum Entropy  

Science Conference Proceedings (OSTI)

We consider the problem of generating a joint distribution for a pair of Bayesian networks that preserves the multivariate marginal distribution of each network and satisfies prescribed correlation between pairs of nodes taken from both networks. We derive the maximum entropy distribution for any pair of multivariate random vectors and prescribed correlations and demonstrate numerical results for an example integration of Bayesian networks.

Jarman, Kenneth D.; Whitney, Paul D.

2011-08-30T23:59:59.000Z

254

Mildly Context Sensitive Grammars For Estimating Maximum  

E-Print Network (OSTI)

Introduction The maximum-entropy framework provides great flexibility in specifying what features a model may take into account, making it e#ective for a wide range of natural language processing tasks. But because parameter estimation in this framework involves computations over the whole space of possible labelings, it is unwieldy for the parsing problem, where this space is very large. Researchers have tried several strategies for e#ciently training parsing models in the maximum-entropy framework. Ratnaparkhi's parser (1997) models the probabilities of actions of a pushdown automaton instead of the probabilities of entire parses, but for this reason is susceptible to the label-bias problem (La#erty et al. 2001). Abney (1997) proposes random sampling of the parse space. Johnson et al. (1999) propose using conditional estimation instead of joint estimation. This reduces the space to the possible parses of a single sentence, which is much smaller but can still be unmanageably large f

David Chiang

2003-01-01T23:59:59.000Z

255

Discontinuities in the Maximum-Entropy Inference  

E-Print Network (OSTI)

We revisit the maximum-entropy inference of the state of a finite-level quantum system under linear constraints. The constraints are specified by the expected values of a set of fixed observables. We point out the existence of discontinuities in this inference method. This is a pure quantum phenomenon since the maximum-entropy inference is continuous for mutually commuting observables. The question arises why some sets of observables are distinguished by a discontinuity in an inference method which is still discussed as a universal inference method. In this paper we make an example of a discontinuity and we explain a characterization of the discontinuities in terms of the openness of the (restricted) linear map that assigns expected values to states.

Stephan Weis

2013-08-28T23:59:59.000Z

256

To: Procurement Directors From: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-26 2-26 Date: March 2, 2012 To: Procurement Directors From: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management Subject: Release of Department of Energy Award Fee and Incentive Fee Reports Summary: To provide a consistent Department of Energy approach on the disclosure of award fee and incentive fee reports (fee determination reports) for management and operating contracts and other major contracts at the Department's sites, the Department will, in the near future, be implementing the following policy: programs shall, at a minimum, publish a one-page score card for each contractor summarizing the fee

257

Maximum Spectral Luminous Efficacy of White Light  

E-Print Network (OSTI)

As lighting efficiency improves, it is useful to understand the theoretical limits to luminous efficacy for light that we perceive as white. Independent of the efficiency with which photons are generated, there exists a spectrally-imposed limit to the luminous efficacy of any source of photons. We find that, depending on the acceptable bandpass and---to a lesser extent---the color temperature of the light, the ideal white light source achieves a spectral luminous efficacy of 250--370 lm/W. This is consistent with previous calculations, but here we explore the maximum luminous efficacy as a function of photopic sensitivity threshold, color temperature, and color rendering index; deriving peak performance as a function of all three parameters. We also present example experimental spectra from a variety of light sources, quantifying the intrinsic efficacy of their spectral distributions.

Murphy, T W

2013-01-01T23:59:59.000Z

258

SUPPORT ADMINISTRATIVE SERVICES FOR THE NATIONAL ENERGY TECHNOLOGY  

NLE Websites -- All DOE Office Websites (Extended Search)

SUPPORT ADMINISTRATIVE SERVICES FOR THE NATIONAL ENERGY TECHNOLOGY LABORATORY TABLE OF CONTENTS SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS ........................................................................ 8 B.1 SERVICES BEING ACQUIRED - SUPPORT ADMINISTRATIVE SERVICES ................................. 8 B.2 GUARANTEED MINIMUM CONTRACT VALUE - MAXIMUM AVAILABLE PERFORMANCE AWARD FEE ........................................................................................................................................................... 8 B.3 CEILING PRICE OF CONTRACT ............................................................................................................ 8 B.4 ESTIMATED LEVEL OF EFFORT ........................................................................................................... 8

259

Preliminary Call for Papers SNA-2011 The Third International Symposium on Sensor Networks and Applications  

E-Print Network (OSTI)

from sensor networks Data fusion / aggregation from sensor networks Network protocols and self-organization will be a maximum of 6 pages (+ 2 pages with additional page fees) in ISCA format. (See http://www.isca-hq directly to the Editor, Dr.Qiang Zhu, qzhu@umich.edu (see instructions to Authors at: http://www.isca-hq

Hu, Fei

260

January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 16, 2013 Secretarial Determination of the Adequacy of the January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Secretary has determined not to propose an adjustment to the fee at this time. The Secretary's determination is available here. January 16 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee.pdf More Documents & Publications CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT FY 2007 Fee Adequacy, Pub 2008 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

January 16, 2013 Secretarial Determination of the Adequacy of the January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Secretary has determined not to propose an adjustment to the fee at this time. The Secretary's determination is available here. January 16 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee.pdf More Documents & Publications FY 2007 Fee Adequacy, Pub 2008 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER

262

Microsoft Word - AcqGuide70pt15rev9.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

70.15 (Septeber 2008) 70.15 (Septeber 2008) 1 M&O Contractor Incentives - Fee, Rollover of Performance Fee, and Award Term [Reference, DEAR 970.1504-1] Overview This chapter provides: (1) a synopsis of the M&O contractor fee policy (focused on the mechanics of the calculation and the key considerations of the policy); (2) guidance on a key aspect of the policy, linking performance fee to outcomes, including guidelines on allowing rollover of performance fee; and (3) guidance on the use of the non-fee incentive of award term. In this guide chapter, the term "DOE" refers to both DOE and NNSA. Background M&O contractor fee policy, found at DEAR 970.1504-1, provides a comprehensive approach to determining an appropriate fee for contractors performing DOE M&O contracts and other

263

Policy Flash 2012-26 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2012-26 Policy Flash 2012-26 Below is Policy Flash 2012-26, Release of Department of Energy Award Fee and Incentive Fee Reports PolicyFlash2012-26.pdf More Documents &...

264

1997 EMC: Registration Form  

Science Conference Proceedings (OSTI)

NONMEMBER REGISTRATION (All fees include a 1998 subscription to JEM) ... not purchase tickets as the cost of the social function, Sunset in the Rockies, is covered by the registration fee. ... Check here if you require transportation to picnic.

265

Management Control Cover  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fees in the Idaho National Laboratory Contract OAS-M-06-07 August 2006 REPORT ON MANAGEMENT CONTROLS OVER PERFORMANCE FEES IN THE IDAHO NATIONAL LABORATORY CONTRACT TABLE OF...

266

Pennsylvania | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Streamlined Solar Permitting and Fee Reduction Photovoltaic systems of 10 kW or less installed on 1- or 2-family residential units are eligible for streamlined permitting and a fee...

267

Golden Valley Electric Association - Sustainable Natural Alternative...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

fee of 100 (includes the cost of verifying interconnection requirements, accessing the grid and installing a meter) * a one-time records fee of 10 (per meter and account) * a...

268

8th Annual TMS Lead Free Solder and Interconnect Technology ...  

Science Conference Proceedings (OSTI)

8th Annual TMS Lead Free Solder and Interconnect. Technology Workshop. Sunday, March 11, 2012 9:00 a.m. 4:30 p.m.. Member fee: $15. Nonmember fee:...

269

www.vics.org1 September 27, 2011  

E-Print Network (OSTI)

and immigration fees and airport charges. Itinerary-specific fuel surcharge applies to all tickets. Changes. Additional Taxes/Fees: All fares are subject to applicable taxes, surcharges, security charges, customs

Lin, Xiaodong

270

CCPPressRelease October 2006  

E-Print Network (OSTI)

and immigration fees and airport charges. Itinerary-specific fuel surcharge applies to all tickets. Changes. Additional Taxes/Fees: All fares are subject to applicable taxes, surcharges, security charges, customs

Feigon, Brooke

271

SR0302  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2003 Media Contact: Rick Ford (803) 725-2889 DOE Announces WSI Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fee earned by...

272

SR9917  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 1999 Media Contact: Rick Ford (803) 725-2889 WSCR Receives Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fees earned by...

273

SR9805  

NLE Websites -- All DOE Office Websites (Extended Search)

16, 1999 Media Contact: Rick Ford (803) 725-2889 WSCR Receives Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fees earned by...

274

Maximum Error Modeling for Fault-Tolerant Computation using Maximum a posteriori (MAP) Hypothesis  

E-Print Network (OSTI)

The application of current generation computing machines in safety-centric applications like implantable biomedical chips and automobile safety has immensely increased the need for reviewing the worst-case error behavior of computing devices for fault-tolerant computation. In this work, we propose an exact probabilistic error model that can compute the maximum error over all possible input space in a circuit specific manner and can handle various types of structural dependencies in the circuit. We also provide the worst-case input vector, which has the highest probability to generate an erroneous output, for any given logic circuit. We also present a study of circuit-specific error bounds for fault-tolerant computation in heterogeneous circuits using the maximum error computed for each circuit. We model the error estimation problem as a maximum a posteriori (MAP) estimate, over the joint error probability function of the entire circuit, calculated efficiently through an intelligent search of the entire input space using probabilistic traversal of a binary join tree using Shenoy-Shafer algorithm. We demonstrate this model using MCNC and ISCAS benchmark circuits and validate it using an equivalent HSpice model. Both results yield the same worst-case input vectors and the highest % difference of our error model over HSpice is just 1.23%. We observe that the maximum error probabilities are significantly larger than the average error probabilities, and provides a much tighter error bounds for fault-tolerant computation. We also find that the error estimates depend on the specific circuit structure and the maximum error probabilities are sensitive to the individual gate failure probabilities.

Karthikeyan Lingasubramanian; Syed M. Alam; Sanjukta Bhanja

2009-06-17T23:59:59.000Z

275

Thermodynamic  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Thermodynamic Quantities. Fees for services are located directly below the technical contacts for each service category link. ...

2013-04-09T23:59:59.000Z

276

NIST CCC Parent Handbook Appendices  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Parent Handbook Appendices. Appendix A: Schedule of Fees (as of August 2009). Appendix B: Rules ...

2010-10-05T23:59:59.000Z

277

Registration - 22nd NISS Conference  

Science Conference Proceedings (OSTI)

... The registration fee covers conference materials, coffee breaks, and admission to the banquet and award ceremony and reception. ...

2002-03-22T23:59:59.000Z

278

ICNS-7: Registration  

Science Conference Proceedings (OSTI)

(Student registration fee includes technical sessions, Sunday evening refreshments, coffee breaks, Monday and Thursday luncheons, and conference banquet.)...

279

Conference Information  

Science Conference Proceedings (OSTI)

Registration fee includes attendance at all technical sessions, Welcoming Reception, Symposium Luncheon, Symposium Banquet, coffee breaks and a bound...

280

Registration - 21st NISS Conference  

Science Conference Proceedings (OSTI)

... Conference The registration fee covers conference materials, coffee breaks, and admission to the banquet and award ceremony. ...

1998-10-20T23:59:59.000Z

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

conference registration form  

Science Conference Proceedings (OSTI)

Tour 2: CESL Plant & Canadian Autoparts Toyota $ 80 ______. TOTAL REGISTRATION FEE (CAN$). $ . HOTEL RESERVATIONS. PLEASE RESERVE YOUR...

282

Table of Content  

Science Conference Proceedings (OSTI)

Page 1. NIST Calibration Program Calibration Services Users Guide SP 250 Appendix Fee Schedule - August 2012 Calibration Services: ...

2012-11-01T23:59:59.000Z

283

Building blocks for tobacco control: a handbook  

E-Print Network (OSTI)

5. Belgium 6. Bosnia and Herzegovina 7. Bulgaria 8. Cyprus1% customs fee - Bosnia & Herzegovina imports 15%, other

World Health Organization - Tobacco Free Initiative

2004-01-01T23:59:59.000Z

284

NATURAL LANGUAGE INFORMATION RETRIEVAL: TREC-3 ...  

Science Conference Proceedings (OSTI)

... oil import fee oil import ... gas operating and maintaining expenses **gas operating ... vice deputyiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii outlook forecast, prospect ...

1997-09-23T23:59:59.000Z

285

PDF Application  

Science Conference Proceedings (OSTI)

Society journals to expand your knowledge. Reduced conference registration fees and student publication prices. Career placement services and the Forum...

286

Tours and Excursions  

Science Conference Proceedings (OSTI)

COMPANIONS PROGRAM. Price: $275 CDN per person. Each tour includes a guided deluxe motorcoach, admission fees where applicable, meals where...

287

Foundation for the Malcolm Baldrige National Quality Award  

Science Conference Proceedings (OSTI)

... which, when supplemented by fees from Award applicants, would permanently fund the Program; oversee the investment of endowment funds ...

2013-08-04T23:59:59.000Z

288

Retail Unbundling - Georgia  

U.S. Energy Information Administration (EIA)

It also clarifies marketer certification procedures. ... PSC adopts affiliate transaction guidelines for AGL. ... Marketer late fee policy changed.

289

Local Laws and Government Policies Prohibiting Discrimination Based on Gender Identity in New York  

E-Print Network (OSTI)

of complaints, but the order does not specify the remediesdoes not explicitly provide for attorneys fees. Executive Order

Mallory, Christy; Liebowitz, Sarah

2013-01-01T23:59:59.000Z

290

Microsoft Word - DOE_PPPL_M119_Section I.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

... 4 CLAUSE I.7 - FAR 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997) ......

291

Modification No. M500 Supplemental Agreement to  

E-Print Network (OSTI)

-BASED FEE The FY 2013 Contractor performance grades for each Goal will be determined based on the weighted. Laboratory Report Card Determining the Amount of Performance-Based Fee Earned: SC uses the following process to determine the overall amount of performance-based fee earned for FY 2013 as calculated within Table D

Johnson, Peter D.

292

Special Edition -Whither Scottish Higher Education? In association with Fraser of Allander Institute  

E-Print Network (OSTI)

of the Browne Report for tuition fees in England from 2012. The Scottish context Within the Scottish context- established menu of options about sources of funding, and, as evident in policies on tuition fees, those the discussion of funding education which tends to concentrate on fees and graduate contributions. Contributions

Mottram, Nigel

293

UNIVERSITY OF TORONTO ECOLOGY and EVOLUTIONARY  

E-Print Network (OSTI)

: Final date to submit Ph.D. thesis to SGS to avoid fee charges for 2012- 2013. September 24: Final date Tuition Fee Bursary to SGS, if you are completing #12;- 6 - degree requirements in Winter 2013 session. Students finishing between September 18, 2012 and January 15, 2013 will pay a one-session incidental fee

Kronzucker, Herbert J.

294

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE IPAGE OF PAGES 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)  

E-Print Network (OSTI)

, Appendix L - Computation of Fee FY 2013. 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type orprint)15A. NAME - Performance Evaluation and Measurement Plan FY2013; and Appendix L - Computation of Fee FY?013. 6. Section J. Section J.12, Appendix L - Computation of Fee for fiscal year 2013 is added to Appendix L. Attachments

Johnson, Peter D.

295

EQUALITY PLAN Please contact equalopportunities@swansea.ac.uk for alternative formats of this  

E-Print Network (OSTI)

://www.swan.ac.uk/media/EOC%20Annual%20Report%202009- 2010.pdf The University Fee Plan Details of the University Fee Plan 2012-2013 http://www.swan.ac.uk/media/EOC%20Annual%20Report%202010-2011.pdf Other university data University Fee partnership (where appropriate). These groups all report to the University Equal Opportunities Committee (EOC

Martin, Ralph R.

296

d'ordre : 424 GI prsente par  

E-Print Network (OSTI)

and are assessed an additional $50 late fee. For more information on paying fees, see "Billing." Mandatory Medical as a voluntary option on the BAR statement and is in addition to the amount due each term. To request MIP, academic or enrollment verification (official, each copy) 5.00 Transcripts -- additional services/fees Same

Paris-Sud XI, Université de

297

Schedule of Classes Annual 2006-07  

E-Print Network (OSTI)

and are assessed an additional $50 late fee. For more information on paying fees, see "Billing." Student Health through BAR, for the entire quarter. In addition, certain professional schools are authorized to charge.00 Transcripts--additional services/fees Same-day Processing Service (per addressee) Special handling Special

Grether, Gregory

298

Schedule of Classes Annual 2010-11  

E-Print Network (OSTI)

student, professional school student), not on the number of enrolled units. They do not include additional that must be submitted by the stated deadlines. For additional deadline information, see the Ashe Center not include additional course or unit-based fees such as the IEI Fee or course materials fees that may

Grether, Gregory

299

Schedule of Classes Annual 201112  

E-Print Network (OSTI)

://www.universityofcalifornia.edu/regents/policies/3101.html for details of the amended policy. GE Cluster Re-uniting and Additional GE Credit sequence from 15 units to 18 units. In addition, a fourth GE credit will be given to students who complete not include additional course or unit-based fees such as the IEI Fee or course materials fees that may

Grether, Gregory

300

2 Spring 2000 Bruin bear comes out of hibernation  

E-Print Network (OSTI)

not include additional course or unit-based fees such as the IEI Fee or course materials fees that may. For additional deadline informa- tion, see the Ashe Center website at http://www.studenthealth.ucla .edu school student), not the number of enrolled units. They do not include additional course or unit

Grether, Gregory

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Schedule of Classes Spring 2012  

E-Print Network (OSTI)

Hall and are assessed an additional $50 late fee. For more information on paying fees, see the Billing, academic or enrollment verification (official, each copy) 5.00 Transcripts--additional services/fees Same the Registration section for additional information about holds. Students with a valid e-mail address established

Grether, Gregory

302

2 UCLA Schedule of Classes Spring 2005 What's New?  

E-Print Network (OSTI)

Hall and are assessed an additional $50 late fee. For more information on paying fees, see the Billing.00 Transcripts--additional services/fees Same-day Processing Service (per addressee) Special handling Special the Registration section for additional information about holds. Students with a valid e-mail address established

Grether, Gregory

303

Schedule of Classes Spring 2007  

E-Print Network (OSTI)

at 1125 Murphy Hall and are assessed an additional $50 late fee. For more information on paying fees, see statement and is in addition to the amount due each term. To request MIP, students must select it by marking.00 Transcripts -- additional services/fees Same day Processing Service (per addressee) Special handling (per

Grether, Gregory

304

Joan Stevens Hall 1st-year students. 242 242 single rooms.  

E-Print Network (OSTI)

single rooms, 38 twin-share places. $170­$213 Yes Yes # Gym area Music room 15 free off-street car parks fee* Electricity included in fee Internet included in fee Facilities available #12;uStay McKenzies = 1

Frean, Marcus

305

Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed  

NLE Websites -- All DOE Office Websites (Extended Search)

0: February 6, 0: February 6, 2006 Maximum Speed Limits by State, 2005 to someone by E-mail Share Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on Facebook Tweet about Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on Twitter Bookmark Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on Google Bookmark Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on Delicious Rank Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on Digg Find More places to share Vehicle Technologies Office: Fact #410: February 6, 2006 Maximum Speed Limits by State, 2005 on AddThis.com...

306

Fast Local Search for the Maximum Independent Set Problem  

E-Print Network (OSTI)

Jan 29, 2008 ... Fast Local Search for the Maximum Independent Set Problem. Diogo V. Andrade (diogo ***at*** google.com) Mauricio G. C. Resende (mgcr...

307

Estimate of Maximum Underground Working Gas Storage Capacity in ...  

U.S. Energy Information Administration (EIA)

Estimate of Maximum Underground Working Gas Storage Capacity in the United States: 2007 Update This report provides an update to an estimate for U.S. aggregate ...

308

THE MAXIMUM k-COLORABLE SUBGRAPH PROBLEM AND ...  

E-Print Network (OSTI)

The main goal of this paper is to investigate the polyhedral con- .... The resulting graph with a maximum (black,white,crossed)-colorable ...... Due to the ad-.

309

CONSTRAINED MINIMUM ENTROPY AND MAXIMUM NEGENTROPY BLIND DECONVOLUTION AND EQUALIZATION  

E-Print Network (OSTI)

CONSTRAINED MINIMUM ENTROPY AND MAXIMUM NEGENTROPY BLIND DECONVOLUTION AND EQUALIZATION Seungjin on the variance of decon­ volved signal. We also consider the maximum negen­ tropy principle and show that the CME version, without any prior knowledge (such as channel impulse response, training data). As the demand

Choi, Seungjin

310

Maximum a posteriori based kernel classifier trained by linear programming  

Science Conference Proceedings (OSTI)

We propose a new approach for classification problem based on the maximum a posteriori (MAP) estimation. The necessary and sufficient condition for the cost function to estimate a posteriori probability was obtained. It was clarified by the condition ... Keywords: cost function, kernel function, linear programming, maximum a posteriori

Nopriadi Nopriadi; Yukihiko Yamashita

2010-08-01T23:59:59.000Z

311

Estimating Maximum Surface Winds from Hurricane Reconnaissance Measurements  

Science Conference Proceedings (OSTI)

Radial profiles of surface winds measured by the Stepped Frequency Microwave Radiometer (SFMR) are compared to radial profiles of flight-level winds to determine the slant ratio of the maximum surface wind speed to the maximum flight-level wind ...

Mark D. Powell; Eric W. Uhlhorn; Jeffrey D. Kepert

2009-06-01T23:59:59.000Z

312

Maximum likelihood estimation of Gaussian mixture models using stochastic search  

Science Conference Proceedings (OSTI)

Gaussian mixture models (GMM), commonly used in pattern recognition and machine learning, provide a flexible probabilistic model for the data. The conventional expectation-maximization (EM) algorithm for the maximum likelihood estimation of the parameters ... Keywords: Covariance parametrization, Expectation-maximization, Gaussian mixture models, Identifiability, Maximum likelihood estimation, Particle swarm optimization, Stochastic search

a?lar Ar?; Selim Aksoy; Orhan Ar?kan

2012-07-01T23:59:59.000Z

313

Maximum oxidative phosphorylation capacity of the mammalian heart  

E-Print Network (OSTI)

Maximum oxidative phosphorylation capacity of the mammalian heart VAMSI K. MOOTHA, ANDREW E. ARAI, AND ROBERT S. BALABAN Laboratory of Cardiac Energetics, National Heart, Lung, and Blood Institute, National. Maximum oxidative phosphorylation capacity of the mammalian heart. Am. J. Physiol. 272 (Heart Circ

Mootha, Vamsi K.

314

2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE 2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND FEE 2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND FEE As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Office of Standard Contract Management has determined that there is no basis to propose an adjustment to the fee to Congress. The Secretary of Energy has adopted and approved this determination. As a result, the fee will remain at the amount specified in the NWPA pending the next annual review. The Secretary's determination is available here. 2011 Secretarial Fee Adequacy Determination.PDF More Documents & Publications Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee

315

2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND  

NLE Websites -- All DOE Office Websites (Extended Search)

2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE 2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND FEE 2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND FEE As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Office of Standard Contract Management has determined that there is no basis to propose an adjustment to the fee to Congress. The Secretary of Energy has adopted and approved this determination. As a result, the fee will remain at the amount specified in the NWPA pending the next annual review. The Secretary's determination is available here. 2011 Secretarial Fee Adequacy Determination.PDF More Documents & Publications Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee

316

Management Control Cover  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Performance Fees in the Idaho Performance Fees in the Idaho National Laboratory Contract OAS-M-06-07 August 2006 REPORT ON MANAGEMENT CONTROLS OVER PERFORMANCE FEES IN THE IDAHO NATIONAL LABORATORY CONTRACT TABLE OF CONTENTS Performance Fees Details of Finding 1 Recommendations and Comments 4 Appendices 1. Objective, Scope, and Methodology 6 2. Other Matters 7 3. Related Audit Reports 8 4. Management Comments 9 PERFORMANCE FEES IN THE IDAHO NATIONAL LABORATORY CONTRACT Page 1 Details of Finding Performance Measures The Department of Energy (Department) did not always effectively and Fees use performance measures and fees to appropriately reward contractor performance. Specifically, the Department allocated approximately $1.1 million for 3 of the 27 performance measures

317

Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG)  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Propane and Compressed Propane and Compressed Natural Gas (CNG) Device Fee to someone by E-mail Share Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on Facebook Tweet about Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on Twitter Bookmark Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on Google Bookmark Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on Delicious Rank Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on Digg Find More places to share Alternative Fuels Data Center: Propane and Compressed Natural Gas (CNG) Device Fee on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

318

Performance Based Incentive FY13 Contractor: Contract: DE-EM0001971  

NLE Websites -- All DOE Office Websites (Extended Search)

Based Incentive Based Incentive FY13 Contractor: Contract: DE-EM0001971 Award Period: Metric 1: Quarter Cubic Meters x $800/m 3 = Fee Earned 1 st 1806.77 $800 $1,445,416 Approved 8/12/2013 2 nd 912.68 $800 $730,144 Approved 9/1/2013 3 rd $800 $0 4 th $800 $0 Totals 2719.45 $2,175,560 Quarter Cubic Meters x $16,000/m 3 = Fee Earned 1 st 14.89 $16,000 $238,240 Approved 8/12/2013 2 nd 6.97 $16,000 $111,520 Approved 9/1/2013 3 rd $16,000 $0 4 th $16,000 $0 Totals 21.86 $349,760 PBI formula PBI Fee Earned Basis of Evaluation a. For each cubic meter of CH waste dispositioned (removed from the TRU inventory of disposed of at WIPP) under Metric 1, a fee of $800 will be earned up to a maximum total of $4,000,000 (approximately 5,000 cubic meters dispositioned). M&O - Waste Isolation Pilot Plant 10/1/12-9/30/17- five-year option to 9/30/22

319

Data:72a32594-a091-45d3-913a-2dba3481d31e | Open Energy Information  

Open Energy Info (EERE)

4-a091-45d3-913a-2dba3481d31e 4-a091-45d3-913a-2dba3481d31e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: San Bernard Electric Coop, Inc Effective date: End date if known: Rate name: 250 W High Pressure Sodium Sector: Lighting Description: Non-standard fixture: $50.00 fixture fee + connect fee Source or reference: http://sbec.coopwebbuilder.com/content/payment-options Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

320

Trends of Maximum and Minimum Temperatures in Northern South America  

Science Conference Proceedings (OSTI)

This paper presents the results of testing the homogeneity of the basic data used in this study, that is, the mean monthly maximum and minimum temperature (as derived from daily observations) of several long-term climatological stations of ...

Ramon A. Quintana-Gomez

1999-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

A maximum likelihood approach towards aggregating partial orders  

Science Conference Proceedings (OSTI)

In many of the possible applications as well as the theoretical models of computational social choice, the agents' preferences are represented as partial orders. In this paper, we extend the maximum likelihood approach for defining "optimal" voting rules ...

Lirong Xia; Vincent Conitzer

2011-07-01T23:59:59.000Z

322

On Determinations of Maximum Hailstone Sizes from Hallpad Observations  

Science Conference Proceedings (OSTI)

Reports of hailstones larger than those indicated by hailpad observations being found on the ground around the hailpad sites raise questions about the validity of maximum-size determinations. Data from the Grossversuch IV hailpad network ...

Paul L. Smith; Albert Waldvogel

1989-01-01T23:59:59.000Z

323

Characteristics of Maximum Concentrations from Multiple Point Sources  

Science Conference Proceedings (OSTI)

A simple quasi-Newton numerical scheme is applied to determine the hypothetical worst-case meteorology that will result in the maximum combined concentrations at any receptor location in air quality modeling over short distances for multiple ...

N. M. Zoumakis

1998-07-01T23:59:59.000Z

324

Synoptic Reorganization of Atmospheric Flow during the Last Glacial Maximum  

Science Conference Proceedings (OSTI)

A coupled global atmosphereocean model of intermediate complexity is used to study the influence of glacial boundary conditions on the atmospheric circulation during the Last Glacial Maximum in a systematical manner. A web of atmospheric ...

Flvio Justino; Axel Timmermann; Ute Merkel; Enio P. Souza

2005-08-01T23:59:59.000Z

325

Humidity Profile Retrieval Using a Maximum Entropy Principle  

Science Conference Proceedings (OSTI)

A satellite data inversion method based on a maximum entropy principle is presented. The method is both physical since a radiative transfer model with its adjoint is needed, and also statistical since errors of the observed radiances and of a ...

Bernard Urban

1995-04-01T23:59:59.000Z

326

Maximum Likelihood Estimation Using Parallel Computing: An Introduction to MPI  

Science Conference Proceedings (OSTI)

The computational difficulty of econometric problems has increased dramatically in recent years as econometricians examine more complicated models and utilize more sophisticated estimation techniques. Many problems in econometrics are `embarrassingly ... Keywords: MPI, maximum likelihood estimation, parallel computing, parallel programming

Christopher A. Swann

2002-04-01T23:59:59.000Z

327

Normalized Maximum-Likelihood Estimators of the Directional Wave Spectrum  

Science Conference Proceedings (OSTI)

A new family of data-adaptative directional wave spectrum estimators is proposed. These estimators may be considered as an improvement over the well-known extended maximum-likelihood method (EMLM). The normalization is based on the idea of ...

M. A. Arribas; J. J. Egozcue

1995-06-01T23:59:59.000Z

328

Maximum likelihood sequence estimation from the lattice viewpoint  

Science Conference Proceedings (OSTI)

Considers the problem of data detection in multilevel lattice-type modulation systems in the presence of intersymbol interference and additive white Gaussian noise. The conventional maximum likelihood sequence estimator using the Viterbi algorithm has ...

Wai Ho Mow

1994-09-01T23:59:59.000Z

329

Maximum containment : the most controversial labs in the world  

E-Print Network (OSTI)

In 2002, following the September 11th attacks and the anthrax letters, the United States allocated money to build two maximum containment biology labs. Called Biosafety Level 4 (BSL-4) facilities, these labs were built to ...

Bruzek, Alison K. (Allison Kim)

2013-01-01T23:59:59.000Z

330

Computing maximum non-crossing matching in convex bipartite graphs  

Science Conference Proceedings (OSTI)

We consider computing a maximum non-crossing matching in convex bipartite graphs. For a convex bipartite graph of n vertices and m edges, we present an O (n logn ...

Danny Z. Chen; Xiaomin Liu; Haitao Wang

2012-05-01T23:59:59.000Z

331

Maximum Photovoltaic Penetration Levels on Typical Distribution Feeders: Preprint  

DOE Green Energy (OSTI)

This paper presents simulation results for a taxonomy of typical distribution feeders with various levels of photovoltaic (PV) penetration. For each of the 16 feeders simulated, the maximum PV penetration that did not result in steady-state voltage or current violation is presented for several PV location scenarios: clustered near the feeder source, clustered near the midpoint of the feeder, clustered near the end of the feeder, randomly located, and evenly distributed. In addition, the maximum level of PV is presented for single, large PV systems at each location. Maximum PV penetration was determined by requiring that feeder voltages stay within ANSI Range A and that feeder currents stay within the ranges determined by overcurrent protection devices. Simulations were run in GridLAB-D using hourly time steps over a year with randomized load profiles based on utility data and typical meteorological year weather data. For 86% of the cases simulated, maximum PV penetration was at least 30% of peak load.

Hoke, A.; Butler, R.; Hambrick, J.; Kroposki, B.

2012-07-01T23:59:59.000Z

332

Effects of Tides on Maximum Tsunami Wave Heights: Probability Distributions  

Science Conference Proceedings (OSTI)

A theoretical study was carried out to understand how the probability distribution for maximum wave heights (?m) during tsunamis depends on the initial tsunami amplitude (A) and the tides. It was assumed that the total wave height is the linear ...

Harold O. Mofjeld; Frank I. Gonzlez; Vasily V. Titov; Angie J. Venturato; Jean C. Newman

2007-01-01T23:59:59.000Z

333

Estimating the Observed Atmospheric Response to SST Anomalies: Maximum Covariance Analysis, Generalized Equilibrium Feedback Assessment, and Maximum Response Estimation  

Science Conference Proceedings (OSTI)

Three multivariate statistical methods to estimate the influence of SST or boundary forcing on the atmosphere are discussed. Lagged maximum covariance analysis (MCA) maximizes the covariance between the atmosphere and prior SST, thus favoring ...

Claude Frankignoul; Nadine Chouaib; Zhengyu Liu

2011-05-01T23:59:59.000Z

334

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

Arizona Department of Motor Vehicles, Phoenix, Arizona,Enhancement Through Increased Motor-Fuel Tax Enforcement,Commercial and Industrialb Motor vehiclesc (AVMV USA,Yr )

Delucchi, Mark

2005-01-01T23:59:59.000Z

335

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

the Full Social Costs and Benefits of Transportation, ed. bythe Full Social Costs and Benefits of Transportation, ed. bytransportation infrastructure and services, then we should set prices on the infrastructure and services equal to marginal social costs.

Delucchi, Mark

2005-01-01T23:59:59.000Z

336

Microseismic monitoring of the Sweet Lake, Louisiana, MagmaGulf-Technadril/D.O.E./Amoco Fee No. 1 Geopressured/Geothermal Energy Test Well Program: Final Report, 20 May 1980-31 May 1984  

DOE Green Energy (OSTI)

The overall objective of the project was to study the seismic effects of fluid withdrawal from deep reservoirs and its subsequent reinjection closer to the surface. This effort included the design and installation of a hardware system and development of a study approach to monitor dynamic deformation in the Gulf Coast environment. Over the long term, insight gained into the ground deformation process (specifically ground subsidence) may potentially allow the integration of observations of individual phenomena into predictive tools for future use in ground subsidence studies. The value of a seismic monitoring network as a predictive tool can only be evaluated by an integrated program to study ground and instrument performance with time. Integrating extended real time monitoring of potential seismic precursors to significant displacements may represent the first integrated study of subsidence undertaken in the Gulf Coast region.

None

1984-05-31T23:59:59.000Z

337

Sweet lake geopressured-geothermal project, Magma Gulf-Technadril/DOE Amoco Fee. Annual report, December 1, 1979-February 27, 1981. Volume I. Drilling and completion test well and disposal well  

DOE Green Energy (OSTI)

The Sweet lake site is located approximately 15 miles southeast of Lake Charles in Cameron Parish, Louisiana. A geological study showed that the major structure in this area is a graben. The dip of the beds is northwesterly into the basin. A well drilled into the deep basin would find the target sand below 18,000', at high pressures and temperatures. However, since there is no well control in the basin, the specific site was chosen on the 15,000' contour of the target sand in the eastern, more narrow part of the garben. Those key control wells are present within one mile of the test well. The information acquired by drilling the test well confirmed the earlier geologic study. The target sand was reached at 15,065', had a porosity of over 20% and a permeability to water of 300 md. The original reservoir pressure was 12,060 psi and the bottom hole temperature 299{sup 0}F. There are approximately 250 net feet of sand available for the perforation. The disposal well was drilled to a total depth of 7440'.

Rodgers, R.W. (ed.)

1982-06-01T23:59:59.000Z

338

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

and on lubricating oils motor-vehicle salesmen; selectivefor example motor vehicles, oil and gas properties, housethe Use of Persian-Gulf Oil for Motor Vehicles (M. Delucchi

Delucchi, Mark

2005-01-01T23:59:59.000Z

339

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

Severance taxes paid on oil and gas (attributed to MV use)Severance taxes paid on oil and gas (attributed to MV use)Severance taxes paid on oil and gas (attributed to MV use)

Delucchi, Mark

2005-01-01T23:59:59.000Z

340

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

of Motor Vehicles, Albany, New York, personal communication,the Justice Court Fund, Albany, New York, data transmittal,of Accounting Operations, Albany, New York (1992). D. M.

Delucchi, Mark

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

general sales taxes) on motor gasoline (EIA, State Energythe sales tax paid on motor-vehicles, gasoline and motor-Motor fuels: portions of federal gasoline and diesel-fuel tax

Delucchi, Mark

2005-01-01T23:59:59.000Z

342

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

Oak Ridge, Tennessee, March (1991). Internal RevenueService, Internal Revenue Report of Excise Taxes, U. S.February 9 (1994). Internal Revenue Service, Excise Taxes

Delucchi, Mark

2005-01-01T23:59:59.000Z

343

TAX AND FEE PAYMENTS BY MOTOR VEHICLE USERS FOR THE USE OF HIGHWAYS, FUELS, AND VEHICLES Report #17 in the series: The Annualized Social Cost of Motor-Vehicle Use in the United States, based on 1990-1991 Data  

E-Print Network (OSTI)

July (1996). Motor Vehicle Manufacturers Association of theaddition, some motor-vehicle manufacturers have been finedEPA charges motor-vehicle manufacturers to cover the cost of

Delucchi, Mark

2005-01-01T23:59:59.000Z

344

Property:Maximum Wave Height(m) | Open Energy Information  

Open Energy Info (EERE)

Property Property Edit with form History Facebook icon Twitter icon » Property:Maximum Wave Height(m) Jump to: navigation, search Property Name Maximum Wave Height(m) Property Type String Pages using the property "Maximum Wave Height(m)" Showing 25 pages using this property. (previous 25) (next 25) 1 1.5-ft Wave Flume Facility + 0.2 + 10-ft Wave Flume Facility + 0.5 + 11-ft Wave Flume Facility + 0.4 + 2 2-ft Flume Facility + 0.6 + 3 3-ft Wave Flume Facility + 0.2 + 5 5-ft Wave Flume Facility + 0.5 + 6 6-ft Wave Flume Facility + 0.4 + A Alden Large Flume + 0.0 + Alden Small Flume + 0.2 + Alden Wave Basin + 0.3 + B Breakwater Research Facility + 0.0 + C Carderock Maneuvering & Seakeeping Basin + 0.6 + Carderock Tow Tank 2 + 0.6 + Carderock Tow Tank 3 + 0.6 +

345

Generalized Relativistic Wave Equations with Intrinsic Maximum Momentum  

E-Print Network (OSTI)

We examine the nonperturbative effect of maximum momentum on the relativistic wave equations. In momentum representation, we obtain the exact eigen-energies and wavefunctions of one-dimensional Klein-Gordon and Dirac equation with linear confining potentials, and the Dirac oscillator. Bound state solutions are only possible when the strength of scalar potential are stronger than vector potential. The energy spectrum of the systems studied are bounded from above, whereby classical characteristics are observed in the uncertainties of position and momentum operators. Also, there is a truncation in the maximum number of bound states that is allowed. Some of these quantum-gravitational features may have future applications.

Chee Leong Ching; Wei Khim Ng

2013-11-15T23:59:59.000Z

346

An effective heuristic algorithm for the maximum satisfiability problem  

Science Conference Proceedings (OSTI)

Stochastic local search algorithms (SLS) have been increasingly applied to approximate solutions of the weighted maximum satisfiability problem (MAXSAT), a model for solutions of major problems in AI and combinatorial optimization. While MAXSAT instances ... Keywords: Bose-Einstein distribution, Extremal Optimization, Heuristic search, MAXSAT, Problem solving

Mohamed El Mena; Mohamed Batouche

2006-06-01T23:59:59.000Z

347

Mixed Integer Linear Programming for Maximum-Parsimony Phylogeny Inference  

Science Conference Proceedings (OSTI)

Reconstruction of phylogenetic trees is a fundamental problem in computational biology. While excellent heuristic methods are available for many variants of this problem, new advances in phylogeny inference will be required if we are to be able to continue ... Keywords: Computational Biology, Algorithms, Integer Linear Programming, Steiner tree problem, Phylogenetic tree reconstruction, Maximum parsimony

Srinath Sridhar; Fumei Lam; Guy E. Blelloch; R. Ravi; Russell Schwartz

2008-07-01T23:59:59.000Z

348

Global Increasing Trends in Annual Maximum Daily Precipitation  

Science Conference Proceedings (OSTI)

This study investigates the presence of trends in annual maximum daily precipitation time series obtained from a global dataset of 8326 high-quality land-based observing stations with more than 30 years of record over the period from 1900 to 2009. ...

Seth Westra; Lisa V. Alexander; Francis W. Zwiers

2013-06-01T23:59:59.000Z

349

Maximum Potential Intensities of Tropical Cyclones near Isla Socorro, Mexico  

Science Conference Proceedings (OSTI)

The maximum potential intensity (MPI) of a tropical cyclone represents a theoretical upper limit to the strength of the storm imposed by the laws of physics and the energy available to the system in the atmosphere and the ocean. The MPI in this ...

Jay S. Hobgood

2003-12-01T23:59:59.000Z

350

An electromagnetism metaheuristic for solving the Maximum Betweenness Problem  

Science Conference Proceedings (OSTI)

In this paper we present an electromagnetism (EM) metaheuristic for solving NP hard Maximum Betweenness Problem (MBP). A new encoding scheme with appropriate objective functions is implemented. Specific representation of the individuals enables the EM ... Keywords: Betweenness problem, Combinatorial optimization, Electromagnetism-like mechanism

Vladimir Filipovi?; Aleksandar Kartelj; Dragan Mati?

2013-02-01T23:59:59.000Z

351

Maximum Fuel Energy Saving of a Brayton Cogeneration Cycle  

Science Conference Proceedings (OSTI)

An endoreversible Joule-Brayton cogeneration cycle has been optimized with fuel energy saving as an assessment criterion. The effects of power-to-heat ratio, cycle temperature ratio, and user temperature ratio on maximum fuel energy saving and efficiency ... Keywords: cogeneration cycle, fuel energy saving, thermodynamic optimization

Xiaoli Hao; Guoqiang Zhang

2009-10-01T23:59:59.000Z

352

The Summer Cyclone Maximum over the Central Arctic Ocean  

Science Conference Proceedings (OSTI)

A fascinating feature of the northern high-latitude circulation is a prominent summer maximum in cyclone activity over the Arctic Ocean, centered near the North Pole in the long-term mean. This pattern is associated with the influx of lows ...

Mark C. Serreze; Andrew P. Barrett

2008-03-01T23:59:59.000Z

353

Maximum power tracking control scheme for wind generator systems  

E-Print Network (OSTI)

The purpose of this work is to develop a maximum power tracking control strategy for variable speed wind turbine systems. Modern wind turbine control systems are slow, and they depend on the design parameters of the turbine and use wind and/or rotor speed measurements as control variable inputs. The dependence on the accuracy of the measurement devices makes the controller less reliable. The proposed control scheme is based on the stiff system concept and provides a fast response and a dynamic solution to the complicated aerodynamic system. This control scheme provides a response to the wind changes without the knowledge of wind speed and turbine parameters. The system consists of a permanent magnet synchronous machine (PMSM), a passive rectifier, a dc/dc boost converter, a current controlled voltage source inverter, and a microcontroller that commands the dc/dc converter to control the generator for maximum power extraction. The microcontroller will also be able to control the current output of the three-phase inverter. In this work, the aerodynamic characteristics of wind turbines and the power conversion system topology are explained. The maximum power tracking control algorithm with a variable step estimator is introduced and the modeling and simulation of the wind turbine generator system using the MATLAB/SIMULINK software is presented and its results show, at least in principle, that the maximum power tracking algorithm developed is suitable for wind turbine generation systems.

Mena Lopez, Hugo Eduardo

2007-12-01T23:59:59.000Z

354

Last Glacial Maximum and Holocene Climate in CCSM3  

Science Conference Proceedings (OSTI)

The climate sensitivity of the Community Climate System Model version 3 (CCSM3) is studied for two past climate forcings, the Last Glacial Maximum (LGM) and the mid-Holocene. The LGM, approximately 21 000 yr ago, is a glacial period with large ...

Bette L. Otto-Bliesner; Esther C. Brady; Gabriel Clauzet; Robert Tomas; Samuel Levis; Zav Kothavala

2006-06-01T23:59:59.000Z

355

Probable Maximum Precipitation Study for Wisconsin and Michigan: Volume 1  

Science Conference Proceedings (OSTI)

The study provides maps and supporting information on the probable maximum precipitation (PMP) for Wisconsin and Michigan. The refinement of PMP for the study area has typically lowered the PMP from the generalized values in Hydrometeorological Report (HMR) 51. The study followed HMR 51 procedures with some minor changes that apply to other regions.

1993-08-01T23:59:59.000Z

356

Feature Extraction Based on Maximum Nearest Subspace Margin Criterion  

Science Conference Proceedings (OSTI)

Based on the classification rule of sparse representation-based classification (SRC) and linear regression classification (LRC), we propose the maximum nearest subspace margin criterion for feature extraction. The proposed method can be seen as a preprocessing ... Keywords: Dimensionality reduction, Face recognition, Feature extraction, Finger knuckle print recognition, Linear regression classification

Yi Chen; Zhenzhen Li; Zhong Jin

2013-06-01T23:59:59.000Z

357

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint  

E-Print Network (OSTI)

Renewable Energy Scheduling for Fading Channels with Maximum Power Constraint Zhe Wang Electrical The employment of the renewable energy source has grown from long-established concepts into devices for powering--In this paper, we develop efficient algorithm to obtain the optimal energy schedule for fading channel

Greenberg, Albert

358

MCMR: Maximum coverage and minimum redundant text summarization model  

Science Conference Proceedings (OSTI)

In paper, we propose an unsupervised text summarization model which generates a summary by extracting salient sentences in given document(s). In particular, we model text summarization as an integer linear programming problem. One of the advantages of ... Keywords: Branch-and-bound, Integer linear programming, Less redundancy, Maximum coverage, Particle swarm optimization, Text summarization

Rasim M. Alguliev; Ramiz M. Aliguliyev; Makrufa S. Hajirahimova; Chingiz A. Mehdiyev

2011-11-01T23:59:59.000Z

359

LITERATURE REVIEW ON MAXIMUM LOADING OF RADIONUCLIDES ON CRYSTALLINE SILICOTITANATE  

SciTech Connect

Plans are underway to use small column ion exchange (SCIX) units installed in high-level waste tanks to remove Cs-137 from highly alkaline salt solutions at Savannah River Site. The ion exchange material slated for the SCIX project is engineered or granular crystalline silicotitanate (CST). Information on the maximum loading of radionuclides on CST is needed by Savannah River Remediation for safety evaluations. A literature review has been conducted that culminated in the estimation of the maximum loading of all but one of the radionuclides of interest (Cs-137, Sr-90, Ba-137m, Pu-238, Pu-239, Pu-240, Pu-241, Am-241, and Cm-244). No data was found for Cm-244.

Adu-Wusu, K.; Pennebaker, F.

2010-10-13T23:59:59.000Z

360

Minimum/maximum excitation limiter performance goals for small generation  

SciTech Connect

Small generators connected to the utility system often act as followers as they tend to follow system bus voltage variations. For the lack of kVA capacity, small machines tend to be susceptible to becoming over or under excited (excessive Vars in or Vars out of the generator) as the voltage regulator tries to maintain its setpoint with variations in system bus voltage. Minimum and maximum excitation limiters are utilized to limit the voltage regulator characteristic response to system bus voltage changes, that can otherwise result in machine overheating and/or pulling out of synchronization. This paper reviews the operating performance of minimum and maximum excitation limiters used on small machines, and provides the user typical performance expectations. The examples will highlight both main field and exciter field applications. Lastly, conditions will be reviewed that may occur during excitation limiter initial startup that can affect their ability to be initially tuned.

Eberly, T.W.; Schaefer, R.C.

1995-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Property:Maximum Velocity(m/s) | Open Energy Information  

Open Energy Info (EERE)

Velocity(m/s) Velocity(m/s) Jump to: navigation, search Property Name Maximum Velocity(m/s) Property Type String Pages using the property "Maximum Velocity(m/s)" Showing 25 pages using this property. (previous 25) (next 25) A Alden Large Flume + 0.9 + B Bucknell Hydraulic Flume + 2.7 + C Carderock Maneuvering & Seakeeping Basin + 7.2 + Carderock Rotating Arm Tow Tank + 25.8 + Carderock Tow Tank 1 + 9.3 + Carderock Tow Tank 2 + 10.3 + Carderock Tow Tank 3 + 25.8 + Chase Tow Tank + 2.5 + D Davidson Laboratory Tow Tank + 18.3 + H Haynes Tow Tank + 1.8 + I Ice Towing Tank + 0.5 + L Lakefront Tow Tank + 2.7 + M MHL Free Surface Channel + 2 + MHL High Speed Cavitation + 25.9 + MHL Tow Tank + 6.7 + MIT Tow Tank + 1.5 + MMA Tugboat/ Barge/ Vessel + 5.1 + Maine Tow Tank + 3 +

362

Unification of Maximum Entropy and Bayesian Inference via Plausible Reasoning  

E-Print Network (OSTI)

This paper modifies Jaynes's axioms of plausible reasoning and derives the minimum relative entropy principle as well as Bayes's rule from first principles. The new axioms, which I call the Optimum Information Principle, is applicable whenever the decision maker is given the data and the relevant background information. Given that the maximum entropy principle and Bayesian inference are useful methods, the Optimum Information Principle is at least as useful.

Toda, Alexis Akira

2011-01-01T23:59:59.000Z

363

Chemical maximum humidity indicator update report. Topical report  

SciTech Connect

Raw materials and manufactured parts sometimes must be kept in a controlled-humidity environment. The use of moisture-sensitive systems to indicate the maximum level of humidity exposure is discussed. A chemical indicator made from deliquescent salts and water-soluble dyes provides an irreversible color change at discrete levels of relative humidity. The performance and long-term-stability characteristics of the indicator are described.

Abel, W.B.

1978-11-01T23:59:59.000Z

364

Property:Maximum Wave Length(m) | Open Energy Information  

Open Energy Info (EERE)

Wave Length(m) Wave Length(m) Jump to: navigation, search Property Name Maximum Wave Length(m) Property Type String Pages using the property "Maximum Wave Length(m)" Showing 18 pages using this property. A Alden Small Flume + Variable + Alden Wave Basin + 1.8 + C Carderock Maneuvering & Seakeeping Basin + 12.2 + Carderock Tow Tank 2 + 12.2 + Carderock Tow Tank 3 + 12.2 + D Davidson Laboratory Tow Tank + 15.2 + DeFrees Large Wave Basin + 64 + DeFrees Small Wave Basin + 30 + H Haynes Wave Basin + 10.7 + L Lakefront Tow Tank + 22 + M MIT Tow Tank + 4.6 + O OTRC Wave Basin + 25 + Ohmsett Tow Tank + 18 + R Richmond Field Station Tow Tank + 2 + S SAFL Channel + 6.6 + Sandia Lake Facility + 4.57 + Sheets Wave Basin + 10 + Ship Towing Tank + 6 + Retrieved from "http://en.openei.org/w/index.php?title=Property:Maximum_Wave_Length(m)&oldid=597351

365

IEP - Water-Energy Interface: Total Maximum Daily Load Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Total Maximum Daily Loads (TMDLs) Total Maximum Daily Loads (TMDLs) The overall goal of the Clean Water Act is to "restore and maintain the chemical, physical, and biological integrity of the Nation’s waters." In 1999, EPA proposed changes to Section 303(d), to establish Total Maximum Daily Loads (TMDLs) for watersheds that do not meet this goal. The TMDL is the highest amount of a given pollutant that is permissible in that body of water over a given period of time. TMDLs include both waste load allocation (WLA) for point sources and load allocations for non-point sources. In Appalachia, acid mine drainage (AMD) is the single most damaging non-point source. There is also particular concern of the atmospheric deposition of airborne sulfur, nitrogen, and mercury compounds. States are currently in the process of developing comprehensive lists of impaired waters and establishing TMDLs for those waters. EPA has recently proposed a final rule that will require states to develop TMDLs and implement plans for improving water quality within the next 10 years. Under the new rule, TMDL credits could be traded within a watershed.

366

DOE Completes Annual Determination of the Adequacy of the Nuclear Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completes Annual Determination of the Adequacy of the Nuclear Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee DOE Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee November 2, 2010 - 7:41pm Addthis As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Office of Standard Contract Management has determined that there is no basis to propose an adjustment to the fee to Congress. The Secretary of Energy has adopted and approved this determination. As a result, the fee will remain at the amount specified in the NWPA pending the next annual review. The Secretary's determination is available here. Addthis Related Articles GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions

367

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 2370 of 31,917 results. 61 - 2370 of 31,917 results. Rebate City of Santa Monica- Building Permit Fee Waiver for Solar Projects In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff... http://energy.gov/savings/city-santa-monica-building-permit-fee-waiver-solar-projects Rebate Local Option- Building Permit Fee Waivers for Renewable Energy Projects (Connecticut) As of July 2011, Connecticut authorizes municipalities to pass a local ordinance to exempt "Class I" renewable energy projects from paying building permit fees. Class I renewable energy projects... http://energy.gov/savings/local-option-building-permit-fee-waivers-renewable-energy-projects-connecticut

368

Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Plug-In Electric Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions to someone by E-mail Share Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions on Facebook Tweet about Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions on Twitter Bookmark Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions on Google Bookmark Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions on Delicious Rank Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) High Occupancy Vehicle (HOV) Lane and Parking Fee Exemptions on Digg

369

AppendixI_SRG _staff_  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I State Fees I. Introduction Twenty-eight 1 states levy some type of fee on shipments of radioactive material in order to fund services such as preparing emergency responders and inspecting radioactive materials shipments. The fees range from twenty-five dollars to forty-five hundred dollars for the initial rail cask. The question for the Department of Energy is how should DOE handle state fees in the context of the Section 180(c) program. The 1998 Draft Policy on Section 180(c) did not address this issue. State fees raise two questions for the Department. Would the Department be paying twice for some activities if it pays state fees and funds the state through 180(c)? And, if so, what can the Department do to meet its obligations under Section 180(c), comply with

370

Microsoft PowerPoint - changeorders  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Negotiation of Incentives on Negotiation of Incentives on Existing Contracts * Incentives/performance fee should be negotiated prospectively * Incentive fees should not be established on: * Incurred costs * Past delivery dates * Or other milestones which have been achieved prior to negotiation of the fee Changes/REAs * Contract changes can only be issued by contracting officers * FAR 43.201 (a) requires changes be issued by contract modification * Contracting Officers should negotiate changes/REAs in a timely manner * Change Control Boards * Need to keep contracts current in order to maintain the effectiveness of incentives and to hold contractors accountable Fee On Existing Contracts * Fee may be paid on negotiated change orders and REAs with entitlement * Fee should not be added to the contract merely

371

Audit Report: ER-B-99-05 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Audit Report: ER-B-99-05 April 8, 1999 Westinghouse Savannah River Company's Withdrawal of Fees As the operator of the Department's Savannah River Site, Westinghouse Savannah River Company (Westinghouse) receives three types of fees: (1) award fees commensurate with the overall performance rating, (2) Performance Based Incentive (PBI) fees for achieving measurable goals or defined tasks as specified in annual operating plans, and (3) Cost Reduction Incentive Program (CRIP) fees for making improvements in site operations that reduce total contract costs. The Department's Contracting Officer notifies Westinghouse when fees are earned, and Westinghouse withdraws the authorized amounts from the Department's letter-of-credit account. The audit objective was to determine whether Westinghouse withdrew

372

Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Plug-In Electric Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study to someone by E-mail Share Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study on Facebook Tweet about Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study on Twitter Bookmark Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study on Google Bookmark Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study on Delicious Rank Alternative Fuels Data Center: Plug-In Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Road Impact Fee Study on Digg

373

Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Plug-in Electric Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees to someone by E-mail Share Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees on Facebook Tweet about Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees on Twitter Bookmark Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees on Google Bookmark Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees on Delicious Rank Alternative Fuels Data Center: Plug-in Electric Vehicle (PEV) and Hybrid Electric Vehicle (HEV) Registration Fees on Digg

374

An integrated maximum power point tracker for photovoltaic panels  

E-Print Network (OSTI)

Abstract- This paper proposes a maximum power point tracker (MPPT) for a photovoltaic panel, that is to be integrated with the panel during manufacturing. The MPPT is inexpensive, efficient and has few components that serve to increase the MPPTs mean time between failures (MTBF). The MPPT uses an inexpensive micro-controller to perform all of its functions. This includes maximum power point tracking, series battery voltage regulation, sensorless short circuit protection of the MPPTs converter and intelligent shutdown and wakeup at dusk and dawn. The MPPT can source 10 A to a 6 V- 36 V lead-acid storage battery and can be connected in parallel or series with other MPPTs. The MPPT may be easily configured to perform output voltage regulation on passive and water pumping loads. It could also control the actuation of a diesel generator in a hybrid remote area power supply (RAPS). Energy transfer enhancements of up to 26%, compared to solar panels without MPPTs, have been measured. The complete component and materials cost of the MPPT is approximately 28 % of the cost of photovoltaic panels with a peak power rating of 154 W. The integrated MPPT also consumes no stored energy at night. 1.

Wernher Swiegers

1998-01-01T23:59:59.000Z

375

Predicting the solar maximum with the rising rate  

E-Print Network (OSTI)

The growth rate of solar activity in the early phase of a solar cycle has been known to be well correlated with the subsequent amplitude (solar maximum). It provides very useful information for a new solar cycle as its variation reflects the temporal evolution of the dynamic process of solar magnetic activities from the initial phase to the peak phase of the cycle. The correlation coefficient between the solar maximum (Rmax) and the rising rate ({\\beta}a) at {\\Delta}m months after the solar minimum (Rmin) is studied and shown to increase as the cycle progresses with an inflection point (r = 0.83) at about {\\Delta}m = 20 months. The prediction error of Rmax based on {\\beta}a is found within estimation at the 90% level of confidence and the relative prediction error will be less than 20% when {\\Delta}m \\geq 20. From the above relationship, the current cycle (24) is preliminarily predicted to peak around October 2013 with a size of Rmax =84 \\pm 33 at the 90% level of confidence.

Du, Z L

2011-01-01T23:59:59.000Z

376

Qualms concerning Tsallis Use of the Maximum Entropy Formalism  

E-Print Network (OSTI)

Tsallis statistical thermodynamic formulation of the nonadditive entropy of degree-? is neither correct nor self-consistent. It is well known that the maximum entropy formalism [1], the minimum discrimination information [2], and Gauss principle [3, 4] all lead to the same results when a certain condition on the prior probability distribution is imposed [5]. All these methods lead to the same form of the posterior probability distribution; namely, the exponential family of distributions. Tsallis and collaborators [6] have tried to adapt the maximum entropy formalism that uses the Shannon entropy to one that uses a nonadditive entropy of degree-?. In order to come out with analytic expressions for the probabilities that maximize the nonadditive entropy they found it necessary to use escort probabilities[7] of the same power as the nonadditive entropy. If the procedure they use is correct then it follows that Gauss principle should give the same optimum probabilities. Yet, we will find that the Tsallis result requires that the prior probability distribution be given by the same unphysical condition as the maximum entropy formalism and, what is worse, the potential of the error law be required to vanish. The potential of the error law is what information theory refers to as the error [8]; that is, the difference between the inaccuracy and the entropy. Unless the true probability distribution, P = (p(x1), p(x2)...,p(xm)) coincides with the estimated probability distribution, Q = (q(x1), q(x2),...q(xm)), the error does not vanish. Moreover, we shall show that two procedures of averaging, one using the escort probabilities explicitly, do not give the same result, and the relation between the potential of the error law and the nonadditive entropy requires the latter to vanish when the former vanishes. Let X be a random variable whose values x1, x2,..., xm are obtained at m independent trials. Prior to the observations the distribution is Q, and after the observations the unknown probability distribution is P. The observer has 1 at his disposal the statistic = 1

B. H. Lavenda; J. Dunning-davies

2003-01-01T23:59:59.000Z

377

PITTSBURGH, PA DISTRICT This District comprises part of eastern Ohio, western  

E-Print Network (OSTI)

2.1.2). Does not include transportation. 2 Individual fee for ABO/Rh. 4.00 per TET (Reference RFP section 2.1.1. a.) Does not include transportation. 3 Individual fee for Antibody Screen. 5.00 per TET (Reference RFP section 2.1.1. b.) Does not include transportation. 4 Individual fee for STS. 3.50 per TET

US Army Corps of Engineers

378

Reduction in maximum time uncertainty of paired time signals  

DOE Patents (OSTI)

Reduction in the maximum time uncertainty (t/sub max/ - t/sub min/) of a series of paired time signals t/sub 1/ and t/sub 2/ varying between two input terminals and representative of a series of single events where t/sub 1/ less than or equal to t/sub 2/ and t/sub 1/ + t/sub 2/ equals a constant, is carried out with a circuit utilizing a combination of OR and AND gates as signal selecting means and one or more time delays to increase the minimum value (t/sub min/) of the first signal t/sub 1/ closer to t/sub max/ and thereby reduce the difference. The circuit may utilize a plurality of stages to reduce the uncertainty by factors of 20 to 800.

Theodosiou, G.E.; Dawson, J.W.

1981-02-11T23:59:59.000Z

379

Solar and Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

Permitting Standards Permitting Standards Jump to: navigation, search Permitting standards can facilitate the installation of wind and solar energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] Contents 1 Solar/Wind Permitting Standards Incentives 2 References Solar/Wind Permitting Standards Incentives

380

Clallam County PUD - Residential and Small Business Solar Loan Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clallam County PUD - Residential and Small Business Solar Loan Clallam County PUD - Residential and Small Business Solar Loan Program Clallam County PUD - Residential and Small Business Solar Loan Program < Back Eligibility Commercial Residential Savings Category Solar Buying & Making Electricity Maximum Rebate $15,000 Program Info State District of Columbia Program Type Utility Loan Program Rebate Amount $1,000 - $15,000 Provider PUD #1 of Clallam County In conjunction with First Federal Savings and Loan, Clallam County PUD offers residential and small commercial customers a low-interest loan program for the purchase of solar photovoltaic systems. There is no application fee and Clallam County PUD covers the loan fee. A list of [http://www.clallampud.net/conservation/res_Eligible_Measures.asp eligible measures] for the loan program is located on the program website. Loans are

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

TABLE OF CONTENTS  

National Nuclear Security Administration (NNSA)

AC05-00OR22800 AC05-00OR22800 TABLE OF CONTENTS Contents Page # TOC - i SECTION A - SOLICITATION/OFFER AND AWARD ......................................................................... A-i SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS ........................................................ B-i B.1 SERVICES BEING ACQUIRED ....................................................................................B-2 B.2 TRANSITION COST, ESTIMATED COST, MAXIMUM AVAILABLE FEE, AND AVAILABLE FEE (Modification 295, 290, 284, 280, 270, 257, 239, 238, 219, M201, M180, M162, M153, M150, M141, M132, M103, M092, M080, M055, M051, M049, M034, M022, M003, A002) ..........................................................B-2 SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT DESCRIPTION OF

382

Solar/Wind Permitting Standards | Open Energy Information  

Open Energy Info (EERE)

Permitting Standards Permitting Standards < Solar Jump to: navigation, search Permitting standards can facilitate the installation of wind and solar energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] Solar/Wind Permitting Standards Incentives CSV (rows 1 - 55) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active

383

Siting & Permitting | Open Energy Information  

Open Energy Info (EERE)

Siting & Permitting Siting & Permitting Jump to: navigation, search Siting and permitting policies can facilitate the installation of clean energy systems by specifying the conditions and fees involved in project development. Some local governments have adopted simplified or expedited permitting standards for wind and/or solar projects. “Top-of-the-stack” or fast-track permitting saves system owners and project developers time and money. Some states have established maximum fees that local governments may charge for a permit for a solar or wind energy system. In addition, some states have developed (or have supported the development of) model wind ordinances for use by local governments. [1] References ↑ DSIRE Glossary Retrieved from "http://en.openei.org/w/index.php?title=Siting_%26_Permitting&oldid=538321"

384

A Finite Groups Package - CECM - Simon Fraser University  

E-Print Network (OSTI)

A Finite Groups Package. Vahid Dabbaghian-Abdoly and Greg Fee. The Centre for Experimental and Censtructiye Mathematics ICECH}. Introduction. As part of...

385

Graduate and Professional Development Programs  

E-Print Network (OSTI)

) .............................. 25A Operations Research (ORP) ................. 26A Space Systems (SPC Faculty Adviser System .............................. 22 Fees ..................................... 4 Grading System........................................... 23 Graduate Admission

Wood, Stephen L.

386

Nevada Regional Science Bowl | U.S. DOE Office of Science (SC...  

Office of Science (SC) Website

NV 89121 Regional Date: February 1, 2013 Fee: NA Regional Geographic Area: Nevada, Utah, and the following counties in California: Sierra, Nevada, Placer, Inyo, Mono, Alpine...

387

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Download CX-007811: Categorical Exclusion Determination "Decommission Ground Water Monitoring Well Located on Bonneville Power Administration (BPA) Fee-owned Property...

388

Alternative Fuels Data Center: New Hampshire Laws and Incentives...  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

and bonded distributor must become licensed with the New Hampshire Department of Safety (Department). An annual license fee of 25 applies. Any licensed biodiesel refiner,...

389

Between Profit and Principle: The Private Public Interest Firm  

E-Print Network (OSTI)

focus has reflected the public-private divide within theattorneys fees, 13 some private public interest lawyershas also protected private public interest lawyers against

Cummings, Scott L; Southworth, Ann

2009-01-01T23:59:59.000Z

390

Secure Identification of Textiles and Other Consumer Products  

revenues and legal fees. In addition to information required by law, useful tracking and inventory information can be embedded in the tags, as well as valuable

391

Mass Metrology Seminar  

Science Conference Proceedings (OSTI)

... See Handbook 143, Program Handbook training requirements ... The current fee is $2,990 which does NOT include meals, lodging, or travel expenses ...

2013-02-19T23:59:59.000Z

392

SunShot Initiative: SunShot Prize Frequently Asked Questions  

NLE Websites -- All DOE Office Websites (Extended Search)

labor, fees for permitting, inspection, marketing, and insurance. Example I: Jane Homeowner purchased solar hardware online for an energy system rated at 5 kilowatts (kW) for...

393

Rights and Duties of Mines and Mine Owners, General (Missouri)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation addresses general operational guidelines for mine owners regarding public notices, fees, land and mineral ownership, requirements for mining in certain municipalities, and mining...

394

Colorado High School Science Bowl | U.S. DOE Office of Science...  

Office of Science (SC) Website

National Renewable Energy Laboratory Address: Dakota Ridge High School; 13399 W. Coal Mine Ave; Littleton, CO 80127 Regional Date: January 26, 2013 Fee: NA Regional...

395

Data:C1ed80a3-ed6e-4ce4-88bd-fbb2c2d63b06 | Open Energy Information  

Open Energy Info (EERE)

SERVICE (250W HPS) Sector: Lighting Description: Additional fees for poles and transformers may apply Source or reference: ISU Documentation Source Parent: Comments...

396

Data:C4200507-e29d-48f1-a653-6b73c9b3530d | Open Energy Information  

Open Energy Info (EERE)

SERVICE (1000W HPS) Sector: Lighting Description: Additional fees for poles and transformers may apply Source or reference: ISU Documentation Source Parent: Comments...

397

Data:2aa07ba4-9aaa-4ed2-974e-604ed46e09db | Open Energy Information  

Open Energy Info (EERE)

LIGHT SERVICE (175W MV) Sector: Lighting Description: Additional fees for poles and transformers may apply Source or reference: ISU Documentation Source Parent: Comments...

398

Data:6dc1030a-abed-4dfe-b2f9-d75fab35a251 | Open Energy Information  

Open Energy Info (EERE)

LIGHT SERVICE (400W MH) Sector: Lighting Description: Additional fees for poles and transformers may apply Source or reference: ISU Documentation Source Parent: Comments...

399

Data:7cb5082d-2c17-402a-a838-6e188e384f6f | Open Energy Information  

Open Energy Info (EERE)

LIGHT SERVICE (250W MH) Sector: Lighting Description: Additional fees for poles and transformers may apply Source or reference: ISU Documentation Source Parent: Comments...

400

Data:5f35ac2c-587d-4cec-9780-3951984ce820 | Open Energy Information  

Open Energy Info (EERE)

SERVICE (100W HPS) Sector: Lighting Description: Additional fees for poles and transformers may apply Source or reference: ISU Documentation Source Parent: Comments...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

9/3/11 9:41 AMUNL | Graduate Studies Bulletin | 2011-2012 Page 1 of 732http://bulletin.unl.edu/archive.html  

E-Print Network (OSTI)

at the direction of the Board of Regents. For the current tuition and fees charges in effect, visit the UNL Student

Farritor, Shane

402

Environmental Quality: Air (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Environmental Quality regulates air quality in Louisiana. The Department has an established a fee system for funding the monitoring, investigation and other activities required...

403

Photonic Science Portfolio  

Abstract Fees; Cross-Talk Free, Low-Noise Optical Amplifier. 5,436,759. A low-noise optical amplifier solves crosstalk problems in optical amplifiers ...

404

Virginia Regional Middle School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

1 Registration Fee: NA Regional Geographic Information: Virginia Team Approval Process Teams are approved on a first-come, first-served basis determined by the datetime...

405

Colorado Regional High School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

2 Registration Fee: NA Regional Geographic Information: Colorado Team Approval Process Teams are approved on a first-come, first-served basis determined by the datetime...

406

Virginia Regional High School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

1 Registration Fee: NA Regional Geographic Information: Virginia Team Approval Process Teams are approved on a first-come, first-served basis determined by the datetime...

407

Hawaii Science Bowl | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

School: 2 Registration Fee: NA Regional Geographic Information: Hawaii Team Approval Process Teams are approved on a first-come, first-served basis determined by the datetime...

408

West Virginia Regional High School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

2 Registration Fee: NA Regional Geographic Information: West Virginia Team Approval Process: Please see the "Notes to Coaches" section below for a description of the Team...

409

Arkansas Regional High Science Bowl | U.S. DOE Office of Science...  

Office of Science (SC) Website

3 Registration Fee: NA Regional Geographic Information: Arkansas Team Approval Process Teams are approved on a first-come, first-served basis determined by the datetime...

410

Missouri Regional Middle School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

3 Registration Fee: TBD Regional Geographic Information: Missouri Team Approval Process Teams are approved on a first-come, first-served basis determined by the datetime...

411

Iowa Regional High School Science Bowl | U.S. DOE Office of Science...  

Office of Science (SC) Website

School: 3 Registration Fee: NA Regional Geographic Information: Iowa Team Approval Process Teams are approved on a first-come, first-served basis determined by the datetime...

412

Montana Regional High School Science Bowl | U.S. DOE Office of...  

Office of Science (SC) Website

School: 2 Registration Fee: NA Regional Geographic Information: Montana Team Approval Process Teams are approved on a first-come, first-served basis determined by the datetime...

413

Mississippi Regional Middle School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

Fee: 40 per team Regional Geographic Information: Mississippi Team Approval Process Teams are approved on a first-come, first-served basis determined by the datetime...

414

Arkansas Regional Middle School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

3 Registration Fee: NA Regional Geographic Information: Arkansas Team Approval Process Teams are approved on a first-come, first-served basis determined by the datetime...

415

Arizona Regional High Science Bowl | U.S. DOE Office of Science...  

Office of Science (SC) Website

School: 3 Registration Fee: NA Regional Geographic Information: Arizona Team Approval Process Teams are approved on a first-come, first-served basis determined by the datetime...

416

PRICM-3: Travel and Destination Information  

Science Conference Proceedings (OSTI)

Each guest room has air conditioning, alarm clocks, balcony, cable TV with HBO, ... fee of $200 to their registration to assist in paying meeting space at the hotel.

417

Tax Credits, Rebates & Savings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Use Fees (Wisconsin) Wisconsin Agricultural Commercial Construction Developer Fed. Government Fuel Distributor General PublicConsumer Industrial InstallerContractor...

418

Non-OPEC oil supply outages remain above year-ago level ...  

U.S. Energy Information Administration (EIA)

Home; Browse by Tag; Most Popular Tags. electricity; oil/petroleum; liquid ... South Sudan has signed an agreement with Sudan on oil export fees and security ...

419

Secretarial Determination of the Adequacy of the Nuclear Waste...  

NLE Websites -- All DOE Office Websites (Extended Search)

next annual review. Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee More Documents & Publications The Report To The President And The Congress By The...

420

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

employees... http:energy.govhcsecurity-forms-and-information Download January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee As required...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

eams-quarterly-report-april-june-2013 Download CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT http:energy.govgcdownloadscivilian-radioactive-...

422

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

http:energy.govemdownloadscontractor-fee-payments-small-sites Download Natural Gas Imports and Exports- Second Quarter Report 2013 Natural Gas Imports and Exports -...

423

SR 2004 News Releases  

NLE Websites -- All DOE Office Websites (Extended Search)

Wackenhut Services Inc. -- SRS Award Fee Determination SR-03-04 Media Advisory: Tritium Celebration SR-04-04 NNSA and WSRC Recognition Progress in Key Tritium Facilities...

424

STEP Regional High School Science Bowl | U.S. DOE Office of Science...  

Office of Science (SC) Website

Fee: NA Regional Geographic Information: New York State STEP students from schools NOT already participating in a regional event Team Approval Process Teams are...

425

20th National Information Systems Security Conference  

Science Conference Proceedings (OSTI)

... 7 and banquet on Oct. 8. The fee for the pre-conference workshops on Oct. 6 is $100. To receive registration information, contact: ...

426

About the 2002 Electronic Materials Conference: Registration and ...  

Science Conference Proceedings (OSTI)

Jun 28, 2002 ... The EMC registration fee includes Welcoming Reception, CoffeeBreaks, Conference Banquet, attendance to all Technical Sessions, and the...

427

Frontiers of Characterization and Metrology for ...  

Science Conference Proceedings (OSTI)

... The registration fee for the conference includes coffee breaks, lunches, a reception, a banquet, a barbecue, and an extended abstract booklet with ...

2013-04-01T23:59:59.000Z

428

SRI2013 | Registration  

Science Conference Proceedings (OSTI)

... fee for the SRI 2013 Conference (Wed - Fri) is $395, and includes participation in all of the sessions, coffee breaks, 2 lunches, banquet (Thu) and ...

429

Materials & Science in Sports  

Science Conference Proceedings (OSTI)

Apr 24, 2001 ... The main registration fee includes the Welcoming Reception, coffee breaks, conference banquet, access to the technical sessions and a copy.

430

International Workshop on Metrology  

NLE Websites -- All DOE Office Websites (Extended Search)

SCOPE PROGRAM WORKSHOP FEES LODGING ABSTRACTS DEADLINES BANQUET SPONSORS DIRECTIONSVISITING ARGONNE POSTER SESSION HOME International Workshop on Metrology for X-ray and Neutron...

431

OP - SFNET - Volume 20, Number 2 March 15, 2013  

Science Conference Proceedings (OSTI)

... There is no registration fee. A banquet will be held on the evening of December 6. For this a contribution will be requested. ...

2013-04-15T23:59:59.000Z

432

Form EIA-861S ANNUAL ELECTRIC POWER INDUSTRY  

Annual Energy Outlook 2012 (EIA)

fee to purchase electricity generated from renewable sources. In addition, Renewable Energy Certificates (RECs), also known as green certificates, green tags, or tradable...

433

Corel Office Document  

U.S. Energy Information Administration (EIA) Indexed Site

Commodity costs Delivery charges Management, Processing, Handling or Broker fees Taxes Demand charges Other, specify Go to Question 17, Section C, next page. 16. Form EIA-871E...

434

electricity.pdf  

U.S. Energy Information Administration (EIA) Indexed Site

Commodity costs Delivery charges Management, Processing, Handling or Broker fees Taxes Demand charges Other, specify Go to Question 17, Section C, next page. 16. Form EIA-871E...

435

book proposal form - TMS  

Science Conference Proceedings (OSTI)

Note: Specialty conference registrants receive a copy of the book with the cost covered in their registration fees. Sponsoring Committee(s)/Division(s):...

436

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

or subcontract termination claims, these amounts should be included in Fluor's total project costs for fee determination purposes. We recognize that the Department gave...

437

TMS Video Contest  

Science Conference Proceedings (OSTI)

There is no fee to enter; however, you are responsible for any costs you may incur for creating and submitting your video. By submitting your video in this...

438

Partnerships and Technology Transfer - Oak Ridge National ...  

Now, DOE, Oak Ridge National Laboratory, ... UT-Battelle can assume performance and financial risk (and charge an equitable fee for this)

439

FY 2010 Honeywell Federal Manufacturing & Technologies, LLC,...  

National Nuclear Security Administration (NNSA)

& Technologies, LLC, the management and operating contractor for the Kansas City Plant, earned an "Excellent" rating and 95.4 percent of the possible incentive fee...

440

FY 2009 Honeywell Federal Manufacturing & Technologies, LLC,...  

National Nuclear Security Administration (NNSA)

& Technologies, LLC, the management and operating contractor for the Kansas City Plant, earned an "Excellent" rating and 95 percent of the possible incentive fee from...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

FY 2008 Honeywell Federal Manufacturing & Technologies, LLC,...  

National Nuclear Security Administration (NNSA)

& Technologies, LLC, the management and operating contractor for the Kansas City Plant, earned an "Excellent" rating and 95.3 percent of the possible incentive fee...

442

FY 2006 Honeywell Federal Manufacturing & Technologies, LLC,...  

National Nuclear Security Administration (NNSA)

& Technologies, LLC, the management and operating contractor for the Kansas City Plant, earned a "Very Good" rating and 76.1 percent of the possible incentive fee from...

443

City of Bloomington - Sustainable Development Incentives | Open...  

Open Energy Info (EERE)

fee waivers and other design incentives for developers that incorporate the city's sustainability goals. The city's four goals include: Energy and resource efficiency including...

444

??The school funding system in post-apartheid South Africa: Is the right to adequate basic education accessible to the rich only??.  

E-Print Network (OSTI)

??The financing of public schools in South Africa is dependent on school fees to a great extent. However, the legislative process governing the charging of (more)

Lorette Elizabeth Arendse

2009-01-01T23:59:59.000Z

445

Fatigue and Fracture Behavior of High Temperature Materials  

Science Conference Proceedings (OSTI)

ice, provided that the base fee of $3.00 per copy is paid directly to Copyright Clearance. Center, 27 Congress Street, Salem, Massa- chusetts 01970. For those...

446

Automotive Alloys 1999  

Science Conference Proceedings (OSTI)

ice, provided that the base fee of $7.00 per copy is paid directly to Copyright Clearance. Center, 27 Congress Street, Salem, Massachu- setts 01970. For those...

447

Rules and Regulations for the Disposal of Low-Level Radioactive Waste (Nebraska)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations, promulgated by the Department of Environmental Quality, contain provisions pertaining to the disposal of low-level radioactive waste, disposal facilities, and applicable fees.

448

www.eia.gov  

U.S. Energy Information Administration (EIA)

PUGOTH 'Who pays natural gas for appliances' Columns 130 Question H-3 1 = Household pays 2 = Rent/Fee 9 = No Answer/Not Applicable ...

449

CALIFORNIA INSTITUTE OF TECHNOLOGY GRADUATE SCHOOL  

E-Print Network (OSTI)

CALIFORNIA INSTITUTE OF TECHNOLOGY GRADUATE SCHOOL FEE WAIVER APPLICATION Applicant ____/____/______ *************************************************************************************** Send completed form to: Office of the Dean of Graduate Studies, 1200 E. California Blvd., MC 23087

Greer, Julia R.

450

Tax Credits, Rebates & Savings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Santa Monica - Building Permit Fee Waiver for Solar Projects California Commercial Construction InstallerContractor Residential Solar Buying & Making Electricity Heating &...

451

Successful Financial Strategies in a Credit-Constrained World  

Net loss: $(3.9 million) ... current and power ... * HamiltonClark has received investment banking fees and owns common stock warrants in Optisense Network Inc. H

452

2nd World Congress on Integrated Computational Materials ...  

Science Conference Proceedings (OSTI)

A fee of $1350 gets you a 6' x 30 draped table; two chairs; wastebasket; standard electricity; and one full conference registration. Download the 2013 ICME...

453

Heat-Flux Sensor Calibration  

Science Conference Proceedings (OSTI)

... 2. TT Gentile, JM Houston, JE Hardis, CL Cromer, and AC ... points) e. Test fee f. Address to ship test item g. Return shipping instructions (prepay ...

2012-11-02T23:59:59.000Z

454

Indiana | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Indianapolis - Green Building Incentive Program The Indianapolis Office of Sustainability and the Department of Code Enforcement offer reduction in permit fees for projects...

455

Tax Credits, Rebates & Savings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Ohio Community Reinvestment Area (Ohio) Ohio Commercial Construction Solar Buying & Making Electricity Ohio Development Services Agency Air Pollution Control Fees (Ohio) Ohio...

456

Tax Credits, Rebates & Savings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Pollution Control Fees (Ohio) Ohio Utility Agricultural Investor-Owned Utility StateProvincial Govt Construction MunicipalPublic Utility Local Government Rural Electric...

457

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar...

458

Audit Report: IG-0390 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

0 Audit Report: IG-0390 May 8, 1996 Department of Energy Management and Operating Contractor Available Fees Audit Report: IG-0390 More Documents & Publications Audit Report:...

459

Small Business Demand Response with Communicating Thermostats: SMUD's Summer Solutions Research Pilot  

E-Print Network (OSTI)

Participants mentioned energy audits multiple times, butSMUDs $300 commercial energy audit fee too onerous forpeak load issues. Energy audits were unanimously popular,

Herter, Karen

2010-01-01T23:59:59.000Z

460

Data:510d6a39-c712-44ac-8350-7a1ec0eacd6a | Open Energy Information  

Open Energy Info (EERE)

kW of firm standby capacity plus Environmental ComplianceCost Recovery, plus Nuclear Construction Cost Recovery, plus Municipal franchise Fee Local Facilities Charge...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

High Performance Green Schools Planning Grants (Pennsylvania...  

Open Energy Info (EERE)

may be used for simulation and modeling costs, including daylighting studies and energy modeling, additional consultancy fees, and costs of documentation required for LEED...

462

Data:F525ad23-72a4-4411-83c2-1a91cb3c0168 | Open Energy Information  

Open Energy Info (EERE)

name: Reconnect fee after hours Sector: Commercial Description: This schedule is for services and products rendered to Customers by BCLP. Source or reference: http:...

463

Data:1d0310f1-f30b-4fb4-805e-b91ecf7ada26 | Open Energy Information  

Open Energy Info (EERE)

Net metering service-connect fee Sector: Commercial Description: This schedule is for services and products rendered to Customers by BCLP. Source or reference: http:...

464

Prime Contract DE-AC36-99GO10337 Modification M110 Attachment...  

NLE Websites -- All DOE Office Websites (Extended Search)

C.1.V. Institutional Direction and Performance Objectives Strategic planning document Plan As mutually agreed H.9 Fee and Performance Cost Proposal Key Deliverable Prior to the...

465

EMS: Group: Date: REVISED 04/09  

E-Print Network (OSTI)

to accurately record beginning and ending mileage, failure to attach gas receipt / fill gas tank, failure ____________________________________ Calculated Charges Basic Rental Fee = $12.25 Mileage: ___________ -25 = __________ X $0

Carter, John

466

Reliability of the U.S. electric system -- Recent trends and current issues  

E-Print Network (OSTI)

per-kWh fee on their electricity bills rather than a time-where record-high electricity bills have resulted from

Osborn, Julie; Kawann, Cornelia

2002-01-01T23:59:59.000Z

467

Massachusetts/EZ Policies | Open Energy Information  

Open Energy Info (EERE)

The application fees may change as a result of this investigation. Investments in Job Creation (Massachusetts) Massachusetts Public Benefits Fund Yes StateProvince The...

468

Extreme Ultraviolet Lithography (EUVL) Portfolio  

Abstract Fees; Passivating Overcoat Bilayer for Multilayer Reflective Coatings for Extreme Ultraviolet (EUV) Lithography. 5,958,605. A passivating overcoat bilayer is ...

469

Dr. Patrick D. Gallagher, Director Biography  

Science Conference Proceedings (OSTI)

... NIST's FY 2013 budget includes $778.0* million in direct and transfer appropriations, an estimated $49.7 million in service fees and $120.6 million ...

2013-06-21T23:59:59.000Z

470

SCSEA Florida Regional Science Bowl | U.S. DOE Office of Science...  

Office of Science (SC) Website

Competition Location: Space Coast Science Education Alliance Address: Florida Solar Energy Center; 1679 Clearlake Road; Cocoa, FL 32922 Regional Date: March 2, 2013 Fee:...

471

CATEGORICAL EXCLUSION FOR APPROVAL OF ESTABLISHMENT OF AN EASEMENT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of a City of Richland easement for the Pacific Northwest National Laboratory (PNNL). PNNL proposes to enter a Fee for Service arrangement with the City of Richland for...

472

Travel and Entertainment All Airlines  

E-Print Network (OSTI)

, Flying Fields Travel Agencies and Tour Operators Bridge and Road Fees, Tolls Services (Utilities) Wire Institutions Securities Brokers /Dealers Insurance Sales, Underwriting and Premiums Lodging Hotels, Motels

Castillo, Steven P.

473

An Information And Institutional Inventory Of California Transit Agencies  

E-Print Network (OSTI)

fees, to pay for compressed natural gas (CNG) buses. Some ofNVT have looked at compressed natural gas as a fuel option

Hickman, Mark; Day, Theodore

1996-01-01T23:59:59.000Z

474

Tax Credits, Rebates & Savings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Tucson - Permit Fee Credit for Solar Energy Systems Arizona Commercial Residential Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling Heating...

475

unknown title  

E-Print Network (OSTI)

doi:10.1093/heapol/czq009 Direct facility funding as a response to user fee reduction: implementation and perceived impact among Kenyan health centres and dispensaries

Antony Opwora; Margaret Kabare; Sassy Molyneux; Catherine Goodman

2009-01-01T23:59:59.000Z

476

Energy Efficiency and Conservation Block Grant Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(commercial and industrial businesses), 8) installation and replacement of light-emitting diode fixtures at the BART Station as a demonstration project, and 9) membership fees...

477

SOLICITATION, OFFER AND AWARD  

National Nuclear Security Administration (NNSA)

Clause Entitled Conditional Payment of Fee, Profit, and Other Incentives- Facility Management Contracts 1 2. Assignment of Existing Subcontracts and Other Agreements 1 3. Budget...

478

Policy Governing Investigator and Institutional Conflicts of...  

NLE Websites -- All DOE Office Websites (Extended Search)

salary (e.g., consulting fees, honoraria, paid authorship); equity interest includes any stock, stock option, or other ownership interest, as determined through reference to...

479

Selected State Residential Heating Oil Prices  

U.S. Energy Information Administration (EIA)

Ohio, on the bottom of the chart, ... overhead operations (including advertising costs) plus county inspection fees are also factored into the price.

480

TMS 2014: Annual Meeting & Exhibition - Justification Toolkit Letter  

Science Conference Proceedings (OSTI)

Hotel: [NOTE: YOU CAN FIND HOTEL FEES ON THE TMS2014 ... Annual Meeting & Exhibition is a wise investment of time and energy that will result in...

Note: This page contains sample records for the topic "fee maximum fee" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

International Benchmarking of Countries' Policies and ...  

Science Conference Proceedings (OSTI)

... A cc ele ra tio n : ... MEP centers are required to match the federal investment with non-federal sources such as state investments and fees for ...

2011-10-24T23:59:59.000Z

482

In This Issue:  

Science Conference Proceedings (OSTI)

... free of charge, ideas for energy- saving inventions. ... NVLAP-accredited laboratories pay annual fees, go through on ... This outlook may have led to the ...

2010-04-08T23:59:59.000Z

483

Interconnection Standards (Connecticut) | Open Energy Information  

Open Energy Info (EERE)

like FERC's standards, include provisions for three levels of systems: Certified, inverter-based systems no larger than 10 kilowatts (kW) in capacity (application fees: 100);...

484

Further Sensitivity Analysis of Hypothetical Policies to Limit ...  

U.S. Energy Information Administration (EIA)

... than make investments to bring it into compliance with upcoming environmental ... associated with the CO 2 fees is used and the coverage of the program.

485

Energy Efficiency in Regulated and Deregulated Markets  

E-Print Network (OSTI)

to licensing, siting, net metering, and utility exit fees.generation with net metering. From the grid-centric point of

Rotenberg, Edan

2005-01-01T23:59:59.000Z

486

MORE  

Science Conference Proceedings (OSTI)

Oct 15, 2013... for this year's tour of the Quantum Design Manufacturing Facility. ... REGISTRATION FEES. Type. Before January 17. After January 17.

487

FY 2008 Honeywell Federal Manufacturing & Technologies, LLC,...  

National Nuclear Security Administration (NNSA)

& Technologies, LLC, the management and operating contractor for the Kansas City Plant, earned an "Excellent" rating and 95.3 percent of the possible incentive fee from...

488

FY 2010 Honeywell Federal Manufacturing & Technologies, LLC,...  

National Nuclear Security Administration (NNSA)

& Technologies, LLC, the management and operating contractor for the Kansas City Plant, earned an "Excellent" rating and 95.4 percent of the possible incentive fee from...

489

I. PURPOSE - ANL  

What is the current value of a share of stock? What is the equity position, in dollars and shares, provided in exchange for the license (or upfront fee)?

490

Draft 8-14-98 - ANL  

What is the current value of a share of stock? What is the equity position, in dollars and shares, provided in exchange for the license (or upfront fee)?

491

SHPE NYC Regional Middle School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

3 Registration Fee: NA Regional Geographic Information: New York City Date of Electric Car Competition: 1122014 Please contact the regional coordinator for more information on...

492

Maryland Regional Middle School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

Fee: 50 per team Regional Geographic Information: Maryland Date of Electric Car Competition: 312014 Please contact the regional coordinator for more information on...

493

Georgia Regional Middle School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

Registration Fee: 50 per team Regional Geographic Information: Georgia Date of Electric Car Competition: 212014 Please contact the regional coordinator for more information on...

494

Alaska Regional Middle School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

School: 3 Registration Fee: NA Regional Geographic Information: Alaska Date of Electric Car Competition: Saturday, February 22, 2014 Please contact the regional coordinator for...

495

Montana Regional Middle School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

2 Registration Fee: NA Regional Geographic Information: Montana Date of Electric Car Competition: 382013 Please contact the regional coordinator for more information on...

496

Connecticut Regional Middle School Science Bowl | U.S. DOE Office...  

Office of Science (SC) Website

Fee: NA Regional Geographic Information: Connecticut, Rhode Island Date of Electric Car Competition: February 22, 2013 Please contact the regional coordinator for more...

497

Sunpowered Energy Systems Ltd | Open Energy Information  

Open Energy Info (EERE)

Name Sunpowered Energy Systems Ltd Place Southsea, United Kingdom Zip PO5 2SN Sector Hydro, Services, Solar, Wind energy Product Offers fee-based consultancy services on...

498

OCEAN DRILLING PROGRAM LEG 139 PRELIMINARY REPORT  

E-Print Network (OSTI)

connections between traditional fields of engineering, physical science and social science, emphasizing internet connections, and an optional campus phone line for an additional fee. There are two community

499

Mapping the Terrain: Language Testing and Placement for US-Educated Language Minority Students in California's Community Colleges [EXECUTIVE SUMMARY  

E-Print Network (OSTI)

college students. Sacramento, CA: Legislative Analyst'shigher education. Sacramento, CA: ICAS. Retrieved fromStudent fee handbook. Sacramento, CA: California Community

Bunch, George; Endris, Ann; Panayotova, Dora; Romero, Michelle; Llosa, Lorena

2011-01-01T23:59:59.000Z

500

Estimate of Maximum Underground Working Gas Storage Capacity in the United States  

Reports and Publications (EIA)

This report examines the aggregate maximum capacity for U.S. natural gas storage. Although the concept of maximum capacityseems quite straightforward, there are numerous issues that preclude the determination of a definitive maximum volume. Thereport presents three alternative estimates for maximum capacity, indicating appropriate caveats for each.

Information Center

2006-09-19T23:59:59.000Z