National Library of Energy BETA

Sample records for fee flag ribbon

  1. Fees

    Broader source: Energy.gov [DOE]

    The DOE Loan Program is required to collect several fees from loan program Applicants. Please find an outline of these fees below. In addition, DOE is supported by outside consultants and legal...

  2. Flag rates for deletion? | OpenEI Community

    Open Energy Info (EERE)

    some "rates" that don't belong; they are one-time connection fees instead of rates (e.g. with a 2,500 connection fee as a "fixed monthly charge"). Is there some way to flag...

  3. fees

    Energy Savers [EERE]

    fed_finance_facilities_ee_upgrades_deployment.doc fed_finance_facilities_ee_upgrades_deployment.doc fed_finance_facilities_ee_upgrades_deployment.doc Microsoft Office document icon fed_finance_facilities_ee_upgrades_deployment.doc More Documents & Publications Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Tools for Designing & Implementing Better Finance Programs finance_programs.doc

    PRIME CONTRACTOR FEES ON SUBCONTRACTOR COSTS U.S.

  4. TWISTED RIBBON FUEL ELEMENT

    DOE Patents [OSTI]

    Breden, C.R.; Schultz, A.B.

    1961-06-01

    A reactor core formed of bundles of parallel fuel elements in the form of ribbons is patented. The fuel ribbons are twisted about their axes so as to have contact with one another at regions spaced lengthwise of the ribbons and to be out of contact with one another at locations between these spaced regions. The contact between the ribbons is sufficient to allow them to be held together in a stable bundle in a containing tube without intermediate support, while permitting enough space between the ribbon for coolant flowing.

  5. Department Seal and Flag

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-05-18

    This directive sets forth the policy governing the use of the official seal and distinguishing flag of the Department of Energy (DOE) as described in Title 10, Code of Federal Regulations (CFR), Part 1002. Cancels DOE O 10002.A dated 1-8-90.

  6. Antiguided fiber ribbon laser

    DOE Patents [OSTI]

    Wilcox, Russel B.; Page, Ralph H.; Beach, Raymond J.; Feit, Michael D.; Payne, Stephen A.

    2003-05-27

    The invention is a ribbon of an optical material with a plurality of cores that run along its length. The plurality of cores includes lasing impurity doped cores in an alternating spaced arrangement with index-modifying impurity doped cores. The ribbon comprises an index of refraction that is substantially equal to or greater than the indices of refraction of said array of lasing impurity doped cores. Index-increasing impurity doped cores promote antiguiding and leaky modes which provide more robust single "supermode" operation.

  7. Blue Ribbon Panel Recommendations Report

    Broader source: Energy.gov [DOE]

    The Department of Energy's Geothermal Technologies Office (formerly Geothermal Technologies Program) assembled a geothermal Blue Ribbon Panel on March 22-23, 2011 in Albuquerque, New Mexico for a...

  8. Melt dumping in string stabilized ribbon growth

    DOE Patents [OSTI]

    Sachs, Emanuel M.

    1986-12-09

    A method and apparatus for stabilizing the edge positions of a ribbon drawn from a melt includes the use of wettable strings drawn in parallel up through the melt surface, the ribbon being grown between the strings. A furnace and various features of the crucible used therein permit continuous automatic growth of flat ribbons without close temperature control or the need for visual inspection.

  9. Geothermal Technologies Program Blue Ribbon Panel Recommendations

    SciTech Connect (OSTI)

    none,

    2011-06-17

    The Geothermal Technologies Program assembled a geothermal Blue Ribbon Panel on March 22-23, 2011 in Albuquerque, New Mexico for a guided discussion on the future of geothermal energy in the United States and the role of the DOE Program. The Geothermal Blue Ribbon Panel Report captures the discussions and recommendations of the experts. An addendum is available here: http://www.eere.energy.gov/geothermal/pdfs/gtp_blue_ribbon_panel_report_addendum10-2011.pdf

  10. Savannah River Site Museum Ribbon Cutting

    Broader source: Energy.gov [DOE]

    A ribbon cutting ceremony marked the opening of the new SRS Museum, on October 27, 2014, at the former Dibble Library in Aiken, South Carolina.

  11. NWP Fee Payments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Expired Contracts Current Contracts Payment Information Nuclear Waste Partnership, LLC (NWP) 2016 Performance Evaluation & Measurement Plan (PEMP) 2015 Performance Evaluation & Measurement Plan (PEMP) 2014 Performance Evaluation & Measurement Plan (PEMP) 2013 Performance Evaluation & Measurement Plan (PEMP) Fee Determination and Scorecard NWP FY15 Fee Determination and Scorecard NWP FY14 Fee Determination Scorecard NWP FY13 Fee Performance Based Incentive Award Fee Performance

  12. Award Fee Determination Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 CH2M Hill Plateau Remediation Company Contract Number: DE-AC06-08RL14788 Final Fee Determination for Base funded Performance Measures Basis of Evaluation: Completion of Performance Measures contained in Section J, Attachment J.4, Performance Evaluation and Measurement Plan, according to the identified completion criteria. Evaluation Results: FY 2012 Base Period Fee Available Fee allocated to FY 2012* Performance Measures $10,399,033.60 Incremental Fee $4,490,000.00 Provisional Fee

  13. FERN Blue Ribbon Wind Farm I | Open Energy Information

    Open Energy Info (EERE)

    FERN Blue Ribbon Wind Farm I Jump to: navigation, search Name FERN Blue Ribbon Wind Farm I Facility FERN Blue Ribbon Wind Farm I Sector Wind energy Facility Type Offshore Wind...

  14. Approval of VPP Logo and Flag

    Broader source: Energy.gov [DOE]

    The Department of Energy Voluntary Protection Program, patterned after the Occupational Safety and Health Administration's Voluntary Protection Programs, is a visible symbol of our commitment to worker health and safety at Departmental facilities. One implementation activity remaining is formal authorization for flags to be awarded to sites in the program and permission to use a related logo.

  15. Patterned helical metallic ribbon for continuous edge winding applications

    DOE Patents [OSTI]

    Liebermann, Howard H.; Frischmann, Peter G.; Rosenberry, Jr., George M.

    1983-04-19

    Metallic ribbon having cutout patterns therein is provided in continuous helical form. The cutout patterns may be situated to intersect either or both of the ribbon edges or may be situated entirely within the ribbon. The helical ribbon with the cutout patterns may additionally have a nesting, or self-stacking, feature.

  16. Blue Ribbon Commission on America's Nuclear Future

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blue Ribbon Commission on America's Nuclear Future Draft Report to the Secretary of Energy July 29, 2011 Draft Report of the Blue Ribbon Commission ii July 2011 PREAMBLE The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new plan. It is co-chaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other

  17. Carbon nanotube fiber spun from wetted ribbon

    DOE Patents [OSTI]

    Zhu, Yuntian T; Arendt, Paul; Zhang, Xiefei; Li, Qingwen; Fu, Lei; Zheng, Lianxi

    2014-04-29

    A fiber of carbon nanotubes was prepared by a wet-spinning method involving drawing carbon nanotubes away from a substantially aligned, supported array of carbon nanotubes to form a ribbon, wetting the ribbon with a liquid, and spinning a fiber from the wetted ribbon. The liquid can be a polymer solution and after forming the fiber, the polymer can be cured. The resulting fiber has a higher tensile strength and higher conductivity compared to dry-spun fibers and to wet-spun fibers prepared by other methods.

  18. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect (OSTI)

    Paul Saueressig

    2010-07-14

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  19. Geothermal Technologies Program Blue Ribbon Panel Recommendations

    Broader source: Energy.gov [DOE]

    This report describes the recommendations of the Geothermal Blue Ribbon Panel, a panel of geothermal experts assembled in March 2011 for a discussion on the future of geothermal energy in the U.S.

  20. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema (OSTI)

    Paul Saueressig

    2010-09-01

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  1. Award Fee Determination Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 CH2M Hill Plateau Remediation Company Contract Number: DE-AC06-08RL14788 Final Fee Determination for Base funded and American Recovery and Reinvestment Act (Recovery) funded Performance Measures Basis of Evaluation: Completion of Performance Measures contained in Section J, AttachmentJ.4, Performance Evaluation and Measurement Plan, according to the identified completion criteria. Evaluation Results: Fiscal Year 2011 (Oct 1, 2010 - Sept 30, 2011) Base Funded Fee Recovery Funded Fee Available

  2. FERN Blue Ribbon Wind Farm II* | Open Energy Information

    Open Energy Info (EERE)

    II* Jump to: navigation, search Name FERN Blue Ribbon Wind Farm II* Facility FERN Blue Ribbon Wind Farm II* Sector Wind energy Facility Type Offshore Wind Facility Status Proposed...

  3. CIRCULAR RIBBON FLARES AND HOMOLOGOUS JETS

    SciTech Connect (OSTI)

    Wang Haimin; Liu Chang

    2012-12-01

    Solar flare emissions in the chromosphere often appear as elongated ribbons on both sides of the magnetic polarity inversion line (PIL), which has been regarded as evidence of a typical configuration of magnetic reconnection. However, flares having a circular ribbon have rarely been reported, although it is expected in the fan-spine magnetic topology involving reconnection at a three-dimensional (3D) coronal null point. We present five circular ribbon flares with associated surges, using high-resolution and high-cadence H{alpha} blue wing observations obtained from the recently digitized films of Big Bear Solar Observatory. In all the events, a central parasitic magnetic field is encompassed by the opposite polarity, forming a circular PIL traced by filament material. Consequently, a flare kernel at the center is surrounded by a circular flare ribbon. The four homologous jet-related flares on 1991 March 17 and 18 are of particular interest, as (1) the circular ribbons brighten sequentially, with cospatial surges, rather than simultaneously, (2) the central flare kernels show an intriguing 'round-trip' motion and become elongated, and (3) remote brightenings occur at a region with the same magnetic polarity as the central parasitic field and are co-temporal with a separate phase of flare emissions. In another flare on 1991 February 25, the circular flare emission and surge activity occur successively, and the event could be associated with magnetic flux cancellation across the circular PIL. We discuss the implications of these observations combining circular flare ribbons, homologous jets, and remote brightenings for understanding the dynamics of 3D magnetic restructuring.

  4. AWARD FEE DETERMINATION SCORECARD Contractor: Restoration Services...

    Office of Environmental Management (EM)

    Basis of Evaluation: FY14 Award Fee Plan for Restoration Services, Inc.; Portsmouth Environmental Technical Services II Award Fee Available: 349,708.00 Award Fee Earned:...

  5. SR0008

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wachenhut Receives Award Fee Flag Ribbon Art Note to Editors and News Directors The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services, Incorporated, for the evaluation period October 1, 1999, through March 31, 2000. A copy of the letter announcing DOE's award fee determination can be obtained by calling (803) 725-2889. -DOE- SR-00-08

  6. SR0302

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, 2003 Media Contact: Rick Ford (803) 725-2889 DOE Announces WSI Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services, Incorporated, for the evaluation period October 1, 2002, through March 31, 2003. The letter announcing DOE's award fee determination is available by calling (803)725-2889. -DOE- SR-03

  7. Fees | Open Energy Information

    Open Energy Info (EERE)

    stub. You can help OpenEI by expanding it. Retrieved from "http:en.openei.orgwindex.php?titleFees&oldid542709" Feedback Contact needs updating Image needs updating...

  8. Pseudo ribbon metal ion beam source

    SciTech Connect (OSTI)

    Stepanov, Igor B. Ryabchikov, Alexander I.; Sivin, Denis O.; Verigin, Dan A.

    2014-02-15

    The paper describes high broad metal ion source based on dc macroparticle filtered vacuum arc plasma generation with the dc ion-beam extraction. The possibility of formation of pseudo ribbon beam of metal ions with the parameters: ion beam length 0.6 m, ion current up to 0.2 A, accelerating voltage 40 kV, and ion energy up to 160 kV has been demonstrated. The pseudo ribbon ion beam is formed from dc vacuum arc plasma. The results of investigation of the vacuum arc evaporator ion-emission properties are presented. The influence of magnetic field strength near the cathode surface on the arc spot movement and ion-emission properties of vacuum-arc discharge for different cathode materials are determined. It was shown that vacuum-arc discharge stability can be reached when the magnetic field strength ranges from 40 to 70 G on the cathode surface.

  9. FOIA FEES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEES FOIA FEES The FOIA generally requires that requestors pay fees for processing their requests. If costs associated with the processing of a FOIA request are $15.00 or less, no fees are charged. Each FOIA request is reviewed for the purpose of placing a requestor in one of the fee categories described in the document below. PDF icon FOIA FEES More Documents & Publications How to Make a FOIA Request FIA-11-0018 - In the Matter of Robert M. Balick FIA-11-0018 - In the Matter of Robert M.

  10. Secretary Chu Announces Blue Ribbon Commission on America's Nuclear

    Energy Savers [EERE]

    Future | Department of Energy Blue Ribbon Commission on America's Nuclear Future Secretary Chu Announces Blue Ribbon Commission on America's Nuclear Future January 29, 2010 - 12:57pm Addthis As part of the Obama Administration's commitment to restarting America's nuclear industry, U.S. Secretary of Energy Steven Chu today announced the formation of a Blue Ribbon Commission on America's Nuclear Future to provide recommendations for developing a safe, long-term solution to managing the

  11. Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    College Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:May 2016 all issues All Issues » submit Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Los Alamos National Security, LLC provides support November 1, 2013 Ribbon cutting at Northern New Mexico College As others look on, Northern New Mexico College President

  12. Faceted ceramic fibers, tapes or ribbons and epitaxial devices therefrom

    DOE Patents [OSTI]

    Goyal, Amit (Knoxville, TN)

    2012-07-24

    A crystalline article includes a single-crystal ceramic fiber, tape or ribbon. The fiber, tape or ribbon has at least one crystallographic facet along its length, which is generally at least one meter long. In the case of sapphire, the facets are R-plane, M-plane, C-plane or A-plane facets. Epitaxial articles, including superconducting articles, can be formed on the fiber, tape or ribbon.

  13. Faceted ceramic fibers, tapes or ribbons and epitaxial devices therefrom

    DOE Patents [OSTI]

    Goyal, Amit

    2013-07-09

    A crystalline article includes a single-crystal ceramic fiber, tape or ribbon. The fiber, tape or ribbon has at least one crystallographic facet along its length, which is generally at least one meter long. In the case of sapphire, the facets are R-plane, M-plane, C-plane or A-plane facets. Epitaxial articles, including superconducting articles, can be formed on the fiber, tape or ribbon.

  14. SYMMETRY OF THE IBEX RIBBON OF ENHANCED ENERGETIC NEUTRAL ATOM...

    Office of Scientific and Technical Information (OSTI)

    HELIOSPHERE; INTERSTELLAR SPACE; KEV RANGE; MAGNETIC FIELDS; PLASMA; REFLECTION; SUN; SYMMETRY The circular ribbon of enhanced energetic neutral atom (ENA) emission...

  15. Guidance system for low angle silicon ribbon growth

    DOE Patents [OSTI]

    Jewett, David N.; Bates, Herbert E.; Milstein, Joseph B.

    1986-07-08

    In a low angle silicon sheet growth process, a puller mechanism advances a seed crystal and solidified ribbon from a cooled growth zone in a melt at a low angle with respect to the horizontal. The ribbon is supported on a ramp adjacent the puller mechanism. Variations in the vertical position of the ribbon with respect to the ramp are isolated from the growth end of the ribbon by (1) growing the ribbon so that it is extremely thin, preferably less than 0.7 mm, (2) maintaining a large growth zone, preferably one whose length is at least 5.0 cm, and (3) spacing the ramp from the growth zone by at least 15 cm.

  16. Ejecta source and transport modeling in the FLAG hydrocode (Conference) |

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Ejecta source and transport modeling in the FLAG hydrocode Citation Details In-Document Search Title: Ejecta source and transport modeling in the FLAG hydrocode Authors: Fung, Jimmy [1] ; Harrison, Alan K [1] ; Margulies, Jeremy [1] ; Chitanvis, Shirish [1] + Show Author Affiliations Los Alamos National Laboratory Publication Date: 2011-08-25 OSTI Identifier: 1091853 Report Number(s): LA-UR-11-04992; LA-UR-11-4992 DOE Contract Number: AC52-06NA25396 Resource Type: Conference

  17. The Blue Ribbon Commission Offers Strong Step Forward | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Blue Ribbon Commission Offers Strong Step Forward The Blue Ribbon Commission Offers Strong Step Forward July 29, 2011 - 12:27pm Addthis Damien LaVera Damien LaVera Deputy Director, Office of Public Affairs Today, the Blue Ribbon Commission on America's Nuclear Future issued a draft of its recommendations. The Obama Administration continues to believe that nuclear energy has an important role to play as America moves to a clean energy future. As part of our commitment to restarting the

  18. Microsoft Word - FY14 NWP Fee Scorecards

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY14 Fee Determination Scorecard Contractor: Nuclear Waste Partnership, LLC Contract: DE-EM0001971 Award Period: October 1, 2013 through September 30, 2014 Basis of Evaluation: Performance and Evaluation Plan (PEMP) for FY2014 The FY2014 PEMP for this contract is available at: http://www.wipp.energy.gov/NWPpayments/NWP.htm Award Fee Scorecard: Subjective Fee (Award Fee) Criteria Summary Table Criteria Maximum Available Fee Adjectival Rating Fee Range Available for Adjectival Ratings Percentage

  19. A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag...

    Office of Scientific and Technical Information (OSTI)

    A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag Citation Details In-Document Search Title: A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag...

  20. Remarks by Federal Blue Ribbon Commission J. David Jameson ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Blue Ribbon Commission J. David Jameson Atlanta, GA October 18, 2011 Good Morning. I am David Jameson. I am President and CEO of the Greater Aiken, South Carolina, Chamber ...

  1. String stabilized ribbon growth a method for seeding same

    DOE Patents [OSTI]

    Sachs, Emanuel M. (39 Harding Ave., Belmont, MA 02178)

    1987-08-25

    This invention is a method of initiating or seeding the growth of a crystalline or polycrystalline ribbon by the String Stabilized Ribbon Growth Method. The method for seeding the crystal growth comprises contacting a melt surface with a seed and two strings used in edge stabilization. The wetted strings attach to the wetted seed as a result of the freezing of the liquid melt. Upon drawing the seed, which is attached to the strings, away from the melt surface a melt liquid meniscus, a seed junction, and a growth interface forms. Further pulling of the attached seed causes a crystal ribbon to grow at the growth interface. The boundaries of the growing ribbon are: at the top the seed junction, at the bottom the freezing boundary of the melt liquid meniscus, and at the edges frozen-in strings.

  2. Blue Ribbon Commission on America's Nuclear Future Charter |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Blue Ribbon Commission on America's Nuclear Future Charter March 2, 2010 - 12:00am Addthis The Secretary of Energy, acting at the direction of the President, is establishing the ...

  3. Alarm Response Training ribbon cutting | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Alarm Response Training ... Alarm Response Training ribbon cutting Posted: October 24, 2014 - 4:45pm The Alarm Response Training Academy officially celebrated its new location at the Y-12 National Security Complex Thursday,Oct. 23. On hand to cut the ribbon were (pictured from left) Teresa Robbins, NNSA Production Office Acting Assistant Manager for Environment, Safety, Health and Quality; Anne Harrington, NNSA Deputy Administrator, Defense Nuclear Nonproliferation; and Morgan Smith, Chief

  4. Solar Decathlon Opening Ceremony and VIP Ribbon Cutting | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Opening Ceremony and VIP Ribbon Cutting Solar Decathlon Opening Ceremony and VIP Ribbon Cutting September 21, 2011 - 1:52pm Addthis Solar Decathlon 2011 at West Potomac Park Solar Decathlon 2011 at West Potomac Park Program Features Government Officials, Students and Foreign Dignitaries WASHINGTON, DC - A ceremony on Thursday featuring U.S. government officials, students, foreign dignitaries and event sponsors will officially open the solar village of the U.S. Department of Energy

  5. SR0106

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    31, 2001 Media Contact: Rick Ford (803) 725-2889 DOE Announces Wackenhut Services Inc. Award Fee Flag Ribbon Art Note To Editors and News Directors: The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services, Incorporated, for the evaluation period October 1, 2000, through March 31, 2001. -DOE- SR-01-06

  6. FINE STRUCTURE OF FLARE RIBBONS AND EVOLUTION OF ELECTRIC CURRENTS

    SciTech Connect (OSTI)

    Sharykin, I. N.; Kosovichev, A. G.

    2014-06-10

    Emission of solar flares across the electromagnetic spectrum is often observed in the form of two expanding ribbons. The standard flare model explains flare ribbons as footpoints of magnetic arcades, emitting due to interaction of energetic particles with the chromospheric plasma. However, the physics of this interaction and properties of the accelerated particles are still unknown. We present results of multiwavelength observations of the C2.1 flare of 2013 August 15, observed with the New Solar Telescope of the Big Bear Solar Observatory, and the Solar Dynamics Observatory, GOES, and Fermi spacecraft. The observations reveal previously unresolved sub-arcsecond structure of flare ribbons in regions of strong magnetic field consisting from numerous small-scale bright knots. We observe a red-blue asymmetry of H{sub α} flare ribbons with a width as small as ∼100 km. We discuss the relationship between the ribbons and vertical electric currents estimated from vector magnetograms, and show that Joule heating can be responsible for energization of H{sub α} knots in the ribbons.

  7. CHPRC Fee Determination Summaries - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CHPRC Fee Determination Summaries DOE-RL Contracts/Procurements RL Contracts & Procurements Home Prime Contracts Current Solicitations Other Sources DOE RL Contracting Officers DOE RL Contracting Officer Representatives CHPRC Fee Determination Summaries Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size CHPRC Fiscal Year 2015 Fee Evaluation Summary CHPRC Fiscal Year 2014 Fee Evaluation Summary CHPRC Fiscal Year 2013 Fee Evaluation Summary CHPRC Fiscal Year 2012

  8. Elastic buckling of AlN ribbons on elastomeric substrate

    SciTech Connect (OSTI)

    Seo, H.-C.; Petrov, Ivan; Jeong, Hyejin; Chapman, Patrick; Kim, Kyekyoon

    2009-03-02

    For optoelectronic applications requiring unconventional substrates, use of flexible forms of semiconductors may be inevitable. We have fabricated a flexible form of single crystalline AlN ribbons with periodic and wavelike structures on an elastomeric substrate. Single crystalline AlN films were grown on Si (111) substrate using high vacuum unbalanced magnetron sputtering. Crystallinity of the AlN films was confirmed with x-ray diffraction and pole figure. The AlN ribbons were transferred to a prestrained (3.1%) elastomeric substrate and the resulting ''wavy'' ribbons on the substrate were flexible up to 30% strain without any crack formation on the surface. As the film thickness changed from 300 to 900 nm, the periods of the waves varied from 95 to 277 {mu}m, which were within a 10% error of the calculated values. When we applied more than 30% strain, mechanical instability, such as the failure of AlN ribbons due to the cracks on the surface and the merged ribbons, was observed.

  9. Report of the Blue Ribbon Panel on the Review of the Radiation...

    Energy Savers [EERE]

    Blue Ribbon Panel on the Review of the Radiation Effects Research Foundation Report of the Blue Ribbon Panel on the Review of the Radiation Effects Research Foundation October 11, ...

  10. Hydrostatic extrusion of Cu-Ag melt spun ribbon

    DOE Patents [OSTI]

    Hill, M.A.; Bingert, J.F.; Bingert, S.A.; Thoma, D.J.

    1998-09-08

    The present invention provides a method of producing high-strength and high-conductance copper and silver materials comprising the steps of combining a predetermined ratio of the copper with the silver to produce a composite material, and melt spinning the composite material to produce a ribbon of copper and silver. The ribbon of copper and silver is heated in a hydrogen atmosphere, and thereafter die pressed into a slug. The slug then is placed into a high-purity copper vessel and the vessel is sealed with an electron beam. The vessel and slug then are extruded into wire form using a cold hydrostatic extrusion process. 5 figs.

  11. Hydrostatic extrusion of Cu-Ag melt spun ribbon

    DOE Patents [OSTI]

    Hill, Mary Ann; Bingert, John F.; Bingert, Sherri A.; Thoma, Dan J.

    1998-01-01

    The present invention provides a method of producing high-strength and high-conductance copper and silver materials comprising the steps of combining a predetermined ratio of the copper with the silver to produce a composite material, and melt spinning the composite material to produce a ribbon of copper and silver. The ribbon of copper and silver is heated in a hydrogen atmosphere, and thereafter die pressed into a slug. The slug then is placed into a high-purity copper vessel and the vessel is sealed with an electron beam. The vessel and slug then are extruded into wire form using a cold hydrostatic extrusion process.

  12. Report of the Blue Ribbon Panel on the Review of the Radiation Effects

    Energy Savers [EERE]

    Research Foundation | Department of Energy Blue Ribbon Panel on the Review of the Radiation Effects Research Foundation Report of the Blue Ribbon Panel on the Review of the Radiation Effects Research Foundation October 11, 1995 This report summarizes the findings of the Blue Ribbon Panel's review of the RERF scientific projects and future research plans The report recommended that the core studies be continued for the next 20 years. PDF icon Report of the Blue Ribbon Panel on the Review of

  13. Contractor Fee Payments - Office of River Protection | Department...

    Energy Savers [EERE]

    PDF icon Waste Treatment Plant Design & Construction More Documents & Publications Contractor Fee Payments - Savannah River Operations Office Contractor Fee Payments - ...

  14. Implementation and Validation of the BHR Turbulence Model in the FLAG

    Office of Scientific and Technical Information (OSTI)

    Hydrocode (Technical Report) | SciTech Connect Implementation and Validation of the BHR Turbulence Model in the FLAG Hydrocode Citation Details In-Document Search Title: Implementation and Validation of the BHR Turbulence Model in the FLAG Hydrocode The BHR-2 turbulence model, developed at Los Alamos National Laboratory for variable density and compressible flows, is implemented in an Arbitrary Lagrangian-Eulerian hydrocode, FLAG. The BHR-2 formulation is discussed, with emphasis on its

  15. Extrusion of metal oxide superconducting wire, tube or ribbon

    DOE Patents [OSTI]

    Dusek, Joseph T. (Lombard, IL)

    1993-01-01

    A process for extruding a superconducting metal oxide composition YBa.sub.2 Cu.sub.3 O.sub.7-x provides a wire (tube or ribbon) having a cohesive mass and a degree of flexibility together with enhanced electrical properties. Wire diameters in the range of 6-85 mils have been produced with smaller wires on the order of 10 mils in diameter exhibiting enhanced flexibility for forming braided, or multistrand, configurations for greater current carrying capacity. The composition for extrusion contains a polymeric binder to provide a cohesive mass to bind the particles together during the extrusion process with the binder subsequently removed at lower temperatures during sintering. The composition for extrusion further includes a deflocculent, an organic plasticizer and a solvent which also are subsequently removed during sintering. Electrically conductive tubing with an inner diameter of 52 mil and an outer diameter of 87-355 mil has also been produced. Flat ribbons have been produced in the range of 10-125 mil thick by 100-500 mil wide. The superconducting wire, tube or ribbon may include an outer ceramic insulating sheath co-extruded with the wire, tubing or ribbon.

  16. Extrusion of metal oxide superconducting wire, tube or ribbon

    DOE Patents [OSTI]

    Dusek, Joseph T.

    1993-10-05

    A process for extruding a superconducting metal oxide composition YBa.sub.2 Cu.sub.3 O.sub.7-x provides a wire (tube or ribbon) having a cohesive mass and a degree of flexibility together with enhanced electrical properties. Wire diameters in the range of 6-85 mils have been produced with smaller wires on the order of 10 mils in diameter exhibiting enhanced flexibility for forming braided, or multistrand, configurations for greater current carrying capacity. The composition for extrusion contains a polymeric binder to provide a cohesive mass to bind the particles together during the extrusion process with the binder subsequently removed at lower temperatures during sintering. The composition for extrusion further includes a deflocculent, an organic plasticizer and a solvent which also are subsequently removed during sintering. Electrically conductive tubing with an inner diameter of 52 mil and an outer diameter of 87-355 mil has also been produced. Flat ribbons have been produced in the range of 10-125 mil thick by 100-500 mil wide. The superconducting wire, tube or ribbon may include an outer ceramic insulating sheath co-extruded with the wire, tubing or ribbon.

  17. SPATIAL RETENTION OF IONS PRODUCING THE IBEX RIBBON

    SciTech Connect (OSTI)

    Schwadron, N. A.; McComas, D. J.

    2013-02-10

    The ribbon observed by the Interstellar Boundary Explorer (IBEX) mission is a narrow, {approx}20 Degree-Sign wide feature that stretches across much of the sky in the global flux of energetic neutral atoms from the outer heliosphere. The ribbon remains an enigma despite its persistence after 3 years of IBEX observations and after almost a dozen theories that attempt to explain it. While each theory that has been posed has its strengths, each one also contradicts IBEX observations or demonstrates significant flaws in internal consistency. Here, we present a new theory that is different than any of the existing ideas and yet accounts for many of the key observations. We argue that the ribbon could be produced by a spatial region in the local interstellar medium where newly ionized atoms are temporarily contained through increased rates of scattering by locally generated waves in the electromagnetic fields. The particles in the ribbon are created predominantly from neutralized solar wind and neutralized pickup ions from inside the solar wind termination shock.

  18. Contractor Fee Payments- Richland Operations Office

    Office of Energy Efficiency and Renewable Energy (EERE)

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Richland Operations Office on these charts. 

  19. Contractor Fee Payments- Oak Ridge Operations

    Broader source: Energy.gov [DOE]

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Oak Ridge Operations on these charts.  

  20. Contractor Fee Payments- Portsmouth Paducah Project Office

    Broader source: Energy.gov [DOE]

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the  Portsmouth Paducah Project Office on these charts.

  1. RL's Fiscal Year 2013 Fee Evaluation Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RL's Fiscal Year 2013 Fee Evaluation Summary Contractor: HPM Corporation (HPMC) Contract: Occupational Medical Services at DOE Hanford Contract Number: DE-EM0002043 Award Period: October 2012 through September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $300,000.00 Award Fee Earned: $284,250.00 Award Fee Area Adjectival Ratings: Performance Incentive Adjectival Rating Allocated Percent Earned Percent Amount Available Amount Earned 1.0: Worker

  2. RL's Fiscal Year 2013 Fee Evaluation Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RL's Fiscal Year 2013 Fee Evaluation Summary Contractor: Mission Support Alliance, LLC (MSA) Contract: Mission Support Contract Contract Number: DE-AC06-09RL14728 Award Period: October 2012 through September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $21,030,647 Award Fee Earned: $19,352,402 (92%) Award Fee Area Adjectival Ratings: Objective: Excellent (96%) $12,117,859 Subjective: Very Good (86%) $7,234,543 The contractor met or exceeded

  3. SR-03-04

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2004 Media Contact: Bill Taylor (803) 952-7697 Wackenhut Services Inc. -- SRS Award Fee Determination Flag Ribbon Art NOTE TO EDITORS AND NEWS DIRECTORS: The Department of Energy's Savannah River Operations Office Manager has determined the award fee amount of the Savannah River Site security contractor, Wackenhut Services Inc.-Savannah River Site. The Award Fee Determination letter that covers the period of October 1, 2003 through March 31, 2004 can be obtained by calling (803) 952-7697.

  4. SR0009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 8, 2000 Media Contact: Rick Ford (803) 725-2889 WSRC Receives Award Fee Flag Ribbon Art Note to Editors and News Directors The Department of Energy (DOE) has determined the performance award fee earned by Westinghouse Savannah River Company for the evaluation period October 1, 1999, through March 31, 2000. To obatin a copy of the letter announcing DOE's award fee determination click here or call (803) 725-2889 -DOE- SR-00-08

  5. SR0015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2000 Media Contact: Jim Giusti (803) 725-2889 WSRC Receives Award Fee Flag Ribbon Graphic Note to Editors and News Directors The Department of Energy (DOE) has determined the performance award fee earned by Westinghouse Savannah River Company for the evaluation period April 1, 2000, through September 30, 2000. To obatin a copy of the letter announcing DOE's award fee determination click here or call (803) 725-2889 -DOE- SR-00-15 | Back |

  6. SR0018

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rick Ford (803) 725-2889 Wackenhut Receives Award Fee Flag Ribbon Graphic The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services, Incorporated, for the evaluation period April 1, 2000, through September 30, 2000. To obatin a copy of the letter announcing DOE's award fee determination click here or call (803) 725-2889. -DOE- SR-00-18

  7. SR9805

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16, 1999 Media Contact: Rick Ford (803) 725-2889 WSCR Receives Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fees earned by Westinghouse Savannah River Company for the evaluation period October 1, 1998, through March 31, 1999. The letter announcing DOE's award fee determination is available by calling (803)725-2889. -DOE- SR-98-05

  8. SR9910

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, 1999 Media Contact: Bill Taylor (803) 725-2889 Wackenhut Receives Award Fee Flag Ribbon Art Note to Editors and News Directors The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services, Incorporated, for the evaluation period January 25, 1999 through May 31, 1999. The letter announcing DOE’s award fee determination is available by calling (803) 725-2889 -DOE- SR-99-10 | Back |

  9. SR9917

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 1999 Media Contact: Rick Ford (803) 725-2889 WSCR Receives Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fees earned by Westinghouse Savannah River Company for the evaluation period April 1, 1999, through September 30, 1999. The letter announcing DOE's award fee determination is available by calling (803)725-2889. -DOE- SR-99-17

  10. Revenue From Contractor Fees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revenue From Contractor Fees Revenue From Contractor Fees Better Buildings Neighborhood Program Sustainability Peer Exchange Call: Revenue from Contractor Fees, call slides and discussion summary, November 1, 2012. PDF icon Call Slides and Discussion Summary More Documents & Publications Regional Networks for Energy Efficiency Key Opportunities and Challenges for Program Sustainability Assessing Revenue Streams: What Is Right for Your Program?

  11. Performance Period Total Fee Paid FY2008

    Office of Environmental Management (EM)

    FY2008 $87,580 FY2009 $87,580 FY2010 $171,763 FY2011 $1,339,286 FY 2012 $38,126 FY 2013 $42,265 Cumulative Fee Paid $1,766,600 $42,265 Cost Plus Incentive Fee/Cost Plus Fixed Fee $36,602,425 Contract Period: September 2007 - November 30, 2012 Target Fee $521,595 Total Estimated Contract Cost Contract Type: Maximum Fee $3,129,570 $175,160 $377,516 $1,439,287 Fee Available $175,160 $80,871 Accelerated Remediation Company (aRc) DE-AT30-07CC60013 Contractor: Contract Number: Minimum Fee $2,086,380

  12. Compact multiwavelength transmitter module for multimode fiber optic ribbon cable

    DOE Patents [OSTI]

    Deri, Robert J.; Pocha, Michael D.; Larson, Michael C.; Garrett, Henry E.

    2002-01-01

    A compact multiwavelength transmitter module for multimode fiber optic ribbon cable, which couples light from an M.times.N array of emitters onto N fibers, where the M wavelength may be distributed across two or more vertical-cavity surface-emitting laser (VCSEL) chips, and combining emitters and multiplexer into a compact package that is compatible with placement on a printed circuit board. A key feature is bringing together two emitter arrays fabricated on different substrates--each array designed for a different wavelength--into close physical proximity. Another key feature is to compactly and efficiently combine the light from two or more clusters of optical emitters, each in a different wavelength band, into a fiber ribbon.

  13. Sandia National Laboratories Algae Raceway Testing Facility Ribbon Cutting

    Broader source: Energy.gov [DOE]

    Sandia National Laboratories will be hosting a ribbon cutting on Feb. 4, 2016 at its Livermore Valley Open Campus to commemorate the opening of a new algae raceway testing facility. The new facility will allow researchers to better understand algal cultivation techniques, and is funded in part by the Bioenergy Technologies Office. Advanced Algal Systems Program Manager Alison Goss Eng and Technology Manager Daniel Fishman will be in attendance.

  14. Color and shape changing polymeric ribbons and sheets

    DOE Patents [OSTI]

    Stevens, Raymond C.; Cheng, Quan; Song, Jie

    2006-05-23

    The present invention herein provides the design, synthesis and characterization of compositions comprising asymmetric bolaamphiphilic lipids that form extended polymeric ribbons and wide sheets. These compositions may be doped, or interspersed, with various compounds to fine-tune the fluidity and rigidity of the bolaamphiphilic lipid composition, and promote other morphologies of the composition, including fluid vesicles and truncated flat sheets. Upon an increase in pH these compositions undergo a calorimetric and morphological transformation.

  15. Method and apparatus for drawing monocrystalline ribbon from a melt

    DOE Patents [OSTI]

    Ciszek, Theodore F.; Schwuttke, Guenter H.

    1981-11-10

    A method and apparatus for drawing a monocrystalline ribbon or web from a melt comprising utilizing a shaping die including at least two elements spaced one from the other each having a portion thereof located below the level of the melt and another portion located above the level of the melt a distance sufficient to form a raised meniscus of melt about the corresponding element.

  16. Award Fee Determination Scorecard Contractor: Savannah River Remediation, LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remediation, LLC Contract: Cost Plus Award Fee (CPAF) Contract Number: DE-AC09-09SR22505 Award Period: October 1, 2013 - September 30, 2014 Basis of Evaluation: Performance and Evaluation Plan (PEMP) Award Fee: $3,000,000.00 Incentive Fee: $22,500,000.00 Forfeiture of Fee: ($27,092.00) Total Fee Available: $28,500,000.00 Total Fee Earned: $26,825,795.00 Percentage Fee Earned: 95% This is a Cost Plus Award Fee contract as defined by Federal Acquisition Regulations (FAR). Fee is made available for

  17. Tunable and angle-insensitive plasmon resonances in graphene ribbon arrays with multispectral diffraction response

    SciTech Connect (OSTI)

    Li, Kangwen; Ma, Xunpeng; Zhang, Zuyin; Xu, Yun, E-mail: xuyun@semi.ac.cn; Song, Guofeng [Institute of Semiconductors, Chinese Academy of Sciences, Beijing (China)

    2014-03-14

    Plasmon resonances in graphene ribbon arrays are investigated numerically by means of the Finite Element Method. Numerical analysis shows that a series of multipolar resonances take place when graphene ribbon arrays are illuminated by a TM polarized electromagnetic wave. Moreover, these resonances are angle-independent, and can be tuned greatly by the width and the doping level of the graphene ribbons. Specifically, we demonstrate that for graphene arrays with several sets of graphene ribbons, which have different widths or doping levels, each of these multipolar resonances will be split into several ones. In addition, as plasmon resonances can confine electromagnetic field at the ribbon edges, graphene ribbons with different widths or doping levels offer intriguing application for electrically tunable spectral imaging.

  18. Title 43 CFR 3000.12 What is the Fee Schedule for Fixed Fees...

    Open Energy Info (EERE)

    000.12 What is the Fee Schedule for Fixed Fees? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  19. Method of making patterned helical metallic ribbon for continuous edge winding applications

    DOE Patents [OSTI]

    Liebermann, H.H.; Frischmann, P.G.; Rosenberry, G.M. Jr.

    1982-08-10

    Metallic ribbon having cutout patterns therein is fabricated in continuous helical form by directing a melt stream or jet onto a rapidly moving patterned substrate surface. 10 figs.

  20. Secretary of Energy Moniz Cuts Ribbon, Kicks Off Solar Decathlon 2015 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Moniz Cuts Ribbon, Kicks Off Solar Decathlon 2015 Secretary of Energy Moniz Cuts Ribbon, Kicks Off Solar Decathlon 2015 October 8, 2015 - 2:20pm Addthis Secretary of Energy Ernest Moniz cuts the ceremonial ribbon to signal the start of U.S. Department of Energy Solar Decathlon 2015 in Irvine, California. | Photo by Matt Dozier, U.S. Department of Energy Secretary of Energy Ernest Moniz cuts the ceremonial ribbon to signal the start of U.S. Department of Energy Solar

  1. Method of making patterned helical metallic ribbon for continuous edge winding applications

    DOE Patents [OSTI]

    Liebermann, Howard H.; Frischmann, Peter G.; Rosenberry, Jr., George M.

    1982-08-10

    Metallic ribbon having cutout patterns therein is fabricated in continuous helical form by directing a melt stream or jet onto a rapidly moving patterned substrate surface.

  2. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment and Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: January 1, 2015, to December 31, 2015 Basis of Evaluation: 2015 Performance Evaluation and Measurement Plan Award Fee Available: $12,600,000 Award Fee Earned: $8,310,000 (66.0* percent) Incentive B.1 - Award Fee-Project Management - Good The fee for Project

  3. Department of Environmental Conservation Stormwater Program Fee...

    Open Energy Info (EERE)

    PermittingRegulatory Guidance - Supplemental Material: Department of Environmental Conservation Stormwater Program Fee SummaryPermittingRegulatory GuidanceSupplemental Material...

  4. FLAG Simulations of the Elasticity Test Problem of Gavrilyuk et al.

    SciTech Connect (OSTI)

    Kamm, James R.; Runnels, Scott R.; Canfield, Thomas R.; Carney, Theodore C.

    2014-04-23

    This report contains a description of the impact problem used to compare hypoelastic and hyperelastic material models, as described by Gavrilyuk, Favrie & Saurel. That description is used to set up hypoelastic simulations in the FLAG hydrocode.

  5. A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag

    Office of Scientific and Technical Information (OSTI)

    (Conference) | SciTech Connect A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag Citation Details In-Document Search Title: A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag Authors: Powell, Devon M. [1] ; Lovegrove, Elizabeth G. [1] ; Kenamond, Mark A. [1] ; Fung, Jimmy [1] + Show Author Affiliations Los Alamos National Laboratory Publication Date: 2013-08-15 OSTI Identifier: 1090643 Report Number(s): LA-UR-13-26471

  6. Spatial confinement of the IBEX Ribbon: A dominant turbulence mechanism

    SciTech Connect (OSTI)

    Isenberg, Philip A.

    2014-05-20

    The narrow ribbon of enhanced energetic neutral atom flux observed by the Interstellar Boundary Explorer spacecraft has prompted numerous ideas to explain its structure and properties. One of these ideas is the 'neutral solar wind' scenario, which identifies the source particles as pickup protons in the local interstellar medium originating in solar wind charge-exchange interactions. This scenario has been thought to require unrealistically weak pitch-angle scattering of the pickup protons to explain the narrow structure. Recently, Schwadron and McComas suggested that this structure could result from a spatial retention of the pickup protons, rather than from a restricted pitch-angle distribution. Here, we present a physically motivated, quantitative mechanism to produce such a spatial configuration. This mechanism is based on the 'dominant turbulence' assumption, which can be applied where the production of new pickup protons is slow, and has been used to successfully explain the level of turbulent heating observed in the outer solar wind. This formalism predicts a pickup isotropization process which adds or subtracts energy from the ambient turbulent fluctuations, depending on the initial pitch angle of the pickup protons. We show that a simple model of this process can yield a ribbon structure in qualitative agreement with the observations. The results of this simple model are not yet quantitatively satisfactory, but we suggest several improvements which may reduce the quantitative discrepancy.

  7. Award Fee Determination Scorecard Contractor: Savannah River Remediation, LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remediation, LLC Contract: Cost Plus Award Fee (CPAF) Contract Number: DE-AC09-09SR22505 Award Period: October 1, 2012 - September 30, 2013 Basis of Evaluation: Performance and Evaluation Plan (PEMP) Award Fee: $3,370,000 Incentive Fee: $28,000,000 Total Fee Available: $31,370.000 Total Fee Earned: $29,742,886 Percentage Earned: 95% This is a Cost Plus Award Fee contract as defined by Federal Acquisition Regulations (FAR). Fee is made available for the completion of explicit work results, such

  8. Contractor Fee Payments - Savannah River Operations Office | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Contractor Fee Payments - Savannah River Operations Office Contractor Fee Payments - Savannah River Operations Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts. PDF icon Comprehensive Security Services PDF icon Site Management and Operations PDF icon Liquid Waste Processing PDF icon Salt Waste Processing Facility More Documents & Publications Contractor Fee

  9. Contractor Fee Payments - Idaho Operations Office | Department of Energy

    Office of Environmental Management (EM)

    Idaho Operations Office Contractor Fee Payments - Idaho Operations Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Idaho Operations Office on these charts. PDF icon Advanced Mixed Waste Treatment Project PDF icon Idaho Cleanup Project More Documents & Publications Contractor Fee Payments - Savannah River Operations Office Contractor Fee Payments - Carlsbad Field

  10. Contractor Fee Payments - Small Sites | Department of Energy

    Office of Environmental Management (EM)

    Oak Ridge Operations Contractor Fee Payments - Oak Ridge Operations See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Oak Ridge Operations on these charts. PDF icon Transuranic Waste Processing - North Wind PDF icon Transuranic Waste Processing - Wastren PDF icon East Tennessee Technology Park More Documents & Publications Contractor Fee Payments - Portsmouth Paducah Project Office Contractor Fee Payments - Savannah

  11. Alternative Fuels Data Center: State Fees as Transportation Funding

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Alternatives Fees as Transportation Funding Alternatives to someone by E-mail Share Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Facebook Tweet about Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Twitter Bookmark Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Google Bookmark Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Delicious Rank

  12. Release of Department of Energy Award Fee and Incentive Fee Reports

    Broader source: Energy.gov [DOE]

    To provide a consistent Department of Energy approach on the disclosure of award fee and incentive fee reports (fee determination reports) for management and operating contracts and other major contracts at the Department’s sites, the Department will, in the near future, be implementing the following policy: programs shall, at a minimum, publish a one-page score card for each contractor summarizing the fee determination and release the fee determination report upon request. However, programs will only release the fee determination report to the public after appropriate redactions are made. The Department’s Senior Procurement Executives, in consultation with the Heads of Contracting Activities and the Office of General Counsel, intend to develop and issue the policy shortly.

  13. Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting March 3, 2010 - 12:00am Addthis Washington, D.C. - On Thursday, March 25th and Friday, March 26th, the Blue Ribbon Commission on America's Nuclear Future, co-chaired by former Congressman Lee Hamilton and former National Security Advisor General Brent Scowcroft, will hold its first meeting in Washington, D.C. At the direction

  14. CONCUR: AWARD FEE PLAN - FY15

    Office of Environmental Management (EM)

    as Facility Support Services Contract Award Fee Plan Contract Number DE-CI0000004 3 editorial or personnel changes may be made and implemented without being provided to the...

  15. FY 14 Award Fee Determination Scorecard

    Office of Environmental Management (EM)

    14 Award Fee Determination Scorecard Contractor: Swift and Staley Inc. (SST) Contract: DE-AC30-10CC40021 Award Period: October 1,2013 - September 30,2014 Basis of Evaluation: FY 14 ...

  16. EM Contractor Fee Payments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    With CPFF contracts, the fee is negotiated and fixed at the inception of the contract. The ... a base amount that is fixed at the inception of the contract and an award amount that ...

  17. Sacramento Ordinance to Waive Solar PV Fees

    Broader source: Energy.gov [DOE]

    This is an ordinance by the city of Sacramento to suspend for the calendar years 2007-2009 all fees related to installation of photovoltaic systems on existing residences.

  18. Performance Period Total Fee Paid FY2001

    Office of Environmental Management (EM)

    FY2001 $4,547,400 FY2002 $4,871,000 FY2003 $6,177,902 FY2004 $8,743,007 FY2005 $13,134,189 FY2006 $7,489,704 FY2007 $9,090,924 FY2008 $10,045,072 FY2009 $12,504,247 FY2010 $17,590,414 FY2011 $17,558,710 FY2012 $14,528,770 Cumulative Fee Paid $126,281,339 Cost Plus Award Fee DE-AC29-01AL66444 Washington TRU Solutions LLC Contractor: Contract Number: Contract Type: $8,743,007 Contract Period: $1,813,482,000 Fee Information Maximum Fee $131,691,744 Total Estimated Contract Cost: $4,547,400

  19. Ejecta modeling in the FLAG hydrocode (u) (Conference) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Ejecta modeling in the FLAG hydrocode (u) Citation Details In-Document Search Title: Ejecta modeling in the FLAG hydrocode (u) Authors: Fung, Jimmy [1] ; Harrison, Alan K [1] ; Margulies, Jeremy [1] ; Buttler, William T [1] ; Olson, Russell T [1] + Show Author Affiliations Los Alamos National Laboratory Publication Date: 2011-07-20 OSTI Identifier: 1083871 Report Number(s): LA-UR-11-04218; LA-UR-11-4218 DOE Contract Number: AC52-06NA25396 Resource Type: Conference Resource Relation: Conference:

  20. Green Flag for a New Era in Green Racing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Flag for a New Era in Green Racing Green Flag for a New Era in Green Racing January 28, 2014 - 5:14pm Addthis Karl Simon (from left) the Environmental Protection Agency’s Director of Transportation and Climate Division for the Office of Transportation and Air Quality; Michael Carr, the Energy Department’s Principal Deputy Assistant Secretary for the Office of Energy Efficiency and Renewable Energy; and Scott Atherton, President of International Motor Sports Association; pose with the

  1. (U) A Gruneisen Equation of State for TPX. Application in FLAG

    SciTech Connect (OSTI)

    Fredenburg, David A.; Aslam, Tariq Dennis; Bennett, Langdon Stanford

    2015-11-02

    A Gruneisen equation of state (EOS) is developed for the polymer TPX (poly 4-methyl-1-pentene) within the LANL hydrocode FLAG. Experimental shock Hugoniot data for TPX is fit to a form of the Gruneisen EOS, and the necessary parameters for implementing the TPX EOS in FLAG are presented. The TPX EOS is further validated through one-dimensional simulations of recent double-shock experiments, and a comparison is made between the new Gruneisen EOS for TPX and the EOS representation for TPX used in the LANL Common Model.

  2. Progress in ejecta modeling in the FLAG code (u) (Conference) | SciTech

    Office of Scientific and Technical Information (OSTI)

    Connect Progress in ejecta modeling in the FLAG code (u) Citation Details In-Document Search Title: Progress in ejecta modeling in the FLAG code (u) Authors: Harrison, Alan K [1] ; Fung, Jimmy [1] ; Chitanvis, Shirish [1] + Show Author Affiliations Los Alamos National Laboratory [Los Alamos National Laboratory Publication Date: 2011-10-05 OSTI Identifier: 1107090 Report Number(s): LA-UR-11-05727; LA-UR-11-5727 DOE Contract Number: AC52-06NA25396 Resource Type: Conference Resource Relation:

  3. Secretary Moniz's Remarks on "A Look Back on the Blue Ribbon...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... It derives from the report of the Blue Ribbon Commission that Jason mentioned, chaired by Lee Hamilton and Brent Scowcroft. That program begins with the operation of a pilot ...

  4. IBEX satellite finds ribbon-like structure at edge of heliosphere

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IBEX satellite finds ribbon-like structure at edge of heliosphere The NASA IBEX mission ... Using the High Energy Neutral Atom Imager, led by Los Alamos National Laboratory, the NASA ...

  5. Blue Ribbon Commission on America's Nuclear Future Report to the Secretary of Energy

    Broader source: Energy.gov [DOE]

    The Blue Ribbon Commission on America’s Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the...

  6. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment & Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: January 1, 2014 to June 30, 2014 Basis of Evaluation: 2014-A Performance Evaluation and Measurement Plan Award Fee Available: $6,300,000 Award Fee Earned: $3,970,000 (63.0%) Incentive B.1 - Award Fee-Project Management The fee for Project Management is divided into three Award Fee Objectives

  7. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment & Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: July 1, 2014 to December 31, 2014 Basis of Evaluation: 2014-B Performance Evaluation and Measurement Plan Award Fee Available: $6,300,000 Award Fee Earned: $4,095,000 (65.0%) Incentive B.1 - Award Fee-Project Management - Good The fee for Project Management

  8. Award Fee Determination Scorecard Contractor: Washington River Protection Solutions, LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract: Tank Operations Contract Contract Number: DE-AC27-08RV14800 Award Fee Period: October 1, 2013 to September 30, 2014 Basis of Evaluation: FY 2014 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available: $12,597,052 Award Fee Earned: $10,459,418 (83.0%) Award Fee Area Adjectival Ratings for each Award Fee Special Emphasis Area (SEA): Functional Element Adjectival Rating* SEA 1: Management of Single-Shell (SST) and Double-Shell Tank (DST) System Excellent SEA 2:

  9. Award Fee Determination Scorecard Contractor: Washington River Protection Solutions, LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Washington River Protection Solutions, LLC Contract: Tank Operations Contract Contract Number: DE-AC27-08RV14800 Award Fee Period: October 1, 2014 to September 30, 2015 Basis of Evaluation: FY 2015 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available: $15,600,000 Award Fee Earned: $13,728,000 (88%) Award Fee Area Adjectival Ratings for each Award Fee Special Emphasis Area (SEA): Functional Element Adjectival Rating* SEA 1: Management of Single-Shell (SST) and Double-Shell

  10. DOE, State Officials Cut Ribbon for New WIPP Emergency Operations Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 7, 2016 DOE, State Officials Cut Ribbon for New WIPP Emergency Operations Center New Mexico Governor Susana Martinez joined U.S. Department of Energy (DOE) officials for a ribbon cutting ceremony to mark the completion of a new state-of-the- art Emergency Operations Center (EOC) located in Carlsbad, NM. "We're pleased to share this accomplishment with Governor Martinez and other state and community leaders," said Mark Whitney, DOE's Principal Deputy Assistant Secretary for

  11. SEPARATION OF THE RIBBON FROM GLOBALLY DISTRIBUTED ENERGETIC NEUTRAL ATOM FLUX USING THE FIRST FIVE YEARS OF IBEX OBSERVATIONS

    SciTech Connect (OSTI)

    Schwadron, N. A.; Moebius, E.; Kucharek, H.; Lee, M. A.; Fairchild, K.; Fuselier, S. A.; McComas, D. J.; Allegrini, F.; Dayeh, M.; Livadiotis, G.; Reno, M.; Funsten, H. O.; Janzen, P.; Reisenfeld, D.; Bzowski, M.; Sokół, J. M.; Kubiak, M. A.; Christian, E. R.; DeMajistre, R.; Frisch, P.; and others

    2014-11-01

    The Interstellar Boundary Explorer (IBEX) observes the IBEX ribbon, which stretches across much of the sky observed in energetic neutral atoms (ENAs). The ribbon covers a narrow (∼20°-50°) region that is believed to be roughly perpendicular to the interstellar magnetic field. Superimposed on the IBEX ribbon is the globally distributed flux that is controlled by the processes and properties of the heliosheath. This is a second study that utilizes a previously developed technique to separate ENA emissions in the ribbon from the globally distributed flux. A transparency mask is applied over the ribbon and regions of high emissions. We then solve for the globally distributed flux using an interpolation scheme. Previously, ribbon separation techniques were applied to the first year of IBEX-Hi data at and above 0.71 keV. Here we extend the separation analysis down to 0.2 keV and to five years of IBEX data enabling first maps of the ribbon and the globally distributed flux across the full sky of ENA emissions. Our analysis shows the broadening of the ribbon peak at energies below 0.71 keV and demonstrates the apparent deformation of the ribbon in the nose and heliotail. We show global asymmetries of the heliosheath, including both deflection of the heliotail and differing widths of the lobes, in context of the direction, draping, and compression of the heliospheric magnetic field. We discuss implications of the ribbon maps for the wide array of concepts that attempt to explain the ribbon's origin. Thus, we present the five-year separation of the IBEX ribbon from the globally distributed flux in preparation for a formal IBEX data release of ribbon and globally distributed flux maps to the heliophysics community.

  12. Phloem Transport of Arsenic Species from Flag Leaf to Grain During Grain Filling

    SciTech Connect (OSTI)

    A Carey; G Norton; C Deacon; K Scheckel; E Lombi; T Punshon; M Guerinot; A Lanzirotti; M Newville; et al.

    2011-12-31

    Strategies to reduce arsenic (As) in rice grain, below concentrations that represent a serious human health concern, require that the mechanisms of As accumulation within grain be established. Therefore, retranslocation of As species from flag leaves into filling rice grain was investigated. Arsenic species were delivered through cut flag leaves during grain fill. Spatial unloading within grains was investigated using synchrotron X-ray fluorescence (SXRF) microtomography. Additionally, the effect of germanic acid (a silicic acid analog) on grain As accumulation in arsenite-treated panicles was examined. Dimethylarsinic acid (DMA) and monomethylarsonic acid (MMA) were extremely efficiently retranslocated from flag leaves to rice grain; arsenate was poorly retranslocated, and was rapidly reduced to arsenite within flag leaves; arsenite displayed no retranslocation. Within grains, DMA rapidly dispersed while MMA and inorganic As remained close to the entry point. Germanic acid addition did not affect grain As in arsenite-treated panicles. Three-dimensional SXRF microtomography gave further information on arsenite localization in the ovular vascular trace (OVT) of rice grains. These results demonstrate that inorganic As is poorly remobilized, while organic species are readily remobilized, from leaves to grain. Stem translocation of inorganic As may not rely solely on silicic acid transporters.

  13. Phloem transport of arsenic species from flag leaf to grain during grain filling

    SciTech Connect (OSTI)

    Carey, Anne-Marie; Norton, Gareth J.; Deacon, Claire; Scheckel, Kirk G.; Lombi, Enzo; Punshon, Tracy; Guerinot, Mary Lou; Lanzirotti, Antonio; Newville, Matt; Choi, Yongseong; Price, Adam H.; Meharg, Andrew A.

    2011-09-20

    Strategies to reduce arsenic (As) in rice grain, below concentrations that represent a serious human health concern, require that the mechanisms of As accumulation within grain be established. Therefore, retranslocation of As species from flag leaves into filling rice grain was investigated. Arsenic species were delivered through cut flag leaves during grain fill. Spatial unloading within grains was investigated using synchrotron X-ray fluorescence (SXRF) microtomography. Additionally, the effect of germanic acid (a silicic acid analog) on grain As accumulation in arsenite-treated panicles was examined. Dimethylarsinic acid (DMA) and monomethylarsonic acid (MMA) were extremely efficiently retranslocated from flag leaves to rice grain; arsenate was poorly retranslocated, and was rapidly reduced to arsenite within flag leaves; arsenite displayed no retranslocation. Within grains, DMA rapidly dispersed while MMA and inorganic As remained close to the entry point. Germanic acid addition did not affect grain As in arsenite-treated panicles. Three-dimensional SXRF microtomography gave further information on arsenite localization in the ovular vascular trace (OVT) of rice grains. These results demonstrate that inorganic As is poorly remobilized, while organic species are readily remobilized, from leaves to grain. Stem translocation of inorganic As may not rely solely on silicic acid transporters.

  14. Title 11 Alaska Administrative Code Chapter 5 Fees | Open Energy...

    Open Energy Info (EERE)

    5 Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 11 Alaska Administrative Code Chapter 5 FeesLegal Abstract...

  15. Title 18 CFR 381 Fees | Open Energy Information

    Open Energy Info (EERE)

    Regulation: Title 18 CFR 381 FeesLegal Abstract Part 381 Fees, Forms under Title 18: Conservation of Power and Water Resources of the U.S. Code of Federal Regulations, current...

  16. Contractor Fee Payments - Savannah River Site Office | Department...

    Broader source: Energy.gov (indexed) [DOE]

    the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts. Liquid Waste...

  17. Alaska Division of Water Permit Fees | Open Energy Information

    Open Energy Info (EERE)

    Water Permit Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Alaska Division of Water Permit Fees Author Alaska Division of Water Published...

  18. Utah Water Rights Fee Schedule | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah Water Rights Fee Schedule Abstract Water rights fee schedule based on amount appropriated....

  19. ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE

    Broader source: Energy.gov [DOE]

    The subject Acquisition Letter's purpose is to provide guidance on provisional payment of fee for non management and operating contracts.

  20. Award Fee Determination Scorecard Contractor: Savannah River Nuclear Solutions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 - September 30, 2013 Basis of Evaluation: Performance and Evaluation Plan (PEMP) This is a Cost Plus Award Fee contract as defined by federal acquisition regulations (FAR). Fee is made available for the completion of explicit work results, such as completing a task on time, or for implicit performance in areas of cost, schedule/timeliness, quality and business relations. Fee may be earned based on an annual evaluation of contract performance. Total available fee for each contract year is

  1. Award Fee Determination Scorecard Contractor: Savannah River Nuclear Solutions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 - September 30, 2015 Basis of Evaluation: Performance and Evaluation Plan (PEMP) This is a Cost Plus Award Fee contract as defined by federal acquisition regulations (FAR). Fee is made available for the completion of explicit work results, such as completing a task on time, or for implicit performance in areas of cost, schedule/timeliness, quality and business relations. Fee may be earned based on an annual evaluation of contract performance. Total available fee for each contract year is

  2. Microsoft Word - Award Fee Determination Scorecard for FY 2013 (4)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August06.doc Microsoft Word - August06.doc PDF icon Microsoft Word - August06.doc More Documents & Publications Microsoft Word - April

    Contract: Tank Operations Contract Contract Number: DE-AC27-08RV14800 Award Fee Period: October 1, 2012 to September 30, 2013 Basis of Evaluation: FY 2013 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available: $7,994,699 Award Fee Earned: $6,483,701 (81.1%) Award Fee Area Adjectival Ratings: Functional Element Adjectival Rating*

  3. Evaluation of Dynamic Mechanical Loading as an Accelerated Test Method for Ribbon Fatigue: Preprint

    SciTech Connect (OSTI)

    Bosco, N.; Silverman, T. J.; Wohlgemuth, J.; Kurtz, S.; Inoue, M.; Sakurai, K.; Shinoda, T.; Zenkoh, H.; Hirota, K.; Miyashita, M.; Tadanori, T.; Suzuki, S.

    2015-04-07

    Dynamic Mechanical Loading (DML) of photovoltaic modules is explored as a route to quickly fatigue copper interconnect ribbons. Results indicate that most of the interconnect ribbons may be strained through module mechanical loading to a level that will result in failure in a few hundred to thousands of cycles. Considering the speed at which DML may be applied, this translates into a few hours o testing. To evaluate the equivalence of DML to thermal cycling, parallel tests were conducted with thermal cycling. Preliminary analysis suggests that one +/-1 kPa DML cycle is roughly equivalent to one standard accelerated thermal cycle and approximately 175 of these cycles are equivalent to a 25-year exposure in Golden Colorado for the mechanism of module ribbon fatigue.

  4. Secretary Moniz's Remarks on "A Look Back on the Blue Ribbon Commission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on America's Nuclear Future" at the Bipartisan Policy Center -- As Delivered | Department of Energy "A Look Back on the Blue Ribbon Commission on America's Nuclear Future" at the Bipartisan Policy Center -- As Delivered Secretary Moniz's Remarks on "A Look Back on the Blue Ribbon Commission on America's Nuclear Future" at the Bipartisan Policy Center -- As Delivered March 24, 2015 - 1:30pm Addthis Dr. Ernest Moniz Dr. Ernest Moniz Secretary of Energy Thank you,

  5. Microsoft Word - DRAFT FY15 Award Fee Plan LATA - 09-19-2014...

    Office of Environmental Management (EM)

    Remediation Contract Award Fee Plan Contract Number: DE-AC30-10CC40020 AWARD FEE PLAN FOR LATA ... (if applicable), (b) one-page scorecard, (c) Award Fee Determination Letter, ...

  6. PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 - March 2013 Page 1 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP) 1 OCTOBER 2012 through 30 SEPTEMBER 2013 Contract No. DE- EM-0001971 I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) provides a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract. Fee determinations are not subject to the Disputes Clause of the contract. II.

  7. Unique Fee-for-Service Revenues | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Unique Fee-for-Service Revenues Unique Fee-for-Service Revenues Better Buildings Neighborhood Program Peer Exchange Calls on Program Sustainability: Unique Fee-for-Service Revenues, Call Slides and Discussion Summary, April 11, 2013. PDF icon Call Slides and Discussion Summary More Documents & Publications Programs: Operating as a Prime Contractor Assessing Revenue Streams: What Is Right for Your Program? Administering Nonprofit Energy Efficiency Programs

  8. WAI Contract & Fee Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WAI Contract & Fee Determination WAI Contract & Fee Determination The attached document is WAI's conformed contract with the Oak Ridge Office of Environmental Managment. It is contract DE-EM0000323, and it includes all sections through MOD80. PDF icon WAI Contract (DE-EM0000323) PDF icon Fee determination letter (Oct. 2014) More Documents & Publications Technical Qualification Program Self-Assessment Report - Nevada Field Office - 2014 2015 Annual Workforce Analysis and Staffing Plan

  9. Award Fee Determination Shows Performance Improvement in WTP Contractor |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Award Fee Determination Shows Performance Improvement in WTP Contractor Award Fee Determination Shows Performance Improvement in WTP Contractor April 14, 2016 - 1:15pm Addthis RICHLAND, Wash. - EM Office of River Protection (ORP) Waste Treatment and Immobilization Plant (WTP) contractor Bechtel National Inc. improved its performance slightly in calendar year 2015 compared to the last half of 2014, earning 66 percent of its possible award fee, or $8.31 million out of a

  10. Award Fee Determination Scorecard Contractor: Savannah River Nuclear Solutions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Solutions Contract: Management and Operations Contract Number: DE-AC09-08SR22470 Award Period: October 1, 2013 - September 30, 2014 Basis of Evaluation: Performance and Evaluation Plan (PEMP) This is a Cost Plus Award Fee contract as defined by federal acquisition regulations (FAR). Fee is made available for the completion of explicit work results, such as completing a task on time, or for implicit performance in areas of cost, schedule/timeliness, quality and business relations. Fee may

  11. Section L Attachment I - Summary and Fee Sheet Amendment 000002...

    National Nuclear Security Administration (NNSA)

    within the submitted MS Excel electronic spreadsheets and workbooks. Section L Attachment I Summary and Fee Sheet Amendment 000002 mulas and links intact and all cells...

  12. Gordon Fee, part 1 | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blake Case Larry Case Patrick Case Dorothy Coker Gordon Fee Linda Fellers Louis Freels Marie Guy Nathan Henry Agnes Houser John Rice Irwin Harvey Kite Charlie Manning Alice...

  13. Gordon Fee, part 2 | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Blake Case Larry Case Patrick Case Dorothy Coker Gordon Fee Linda Fellers Louis Freels Marie Guy Nathan Henry Agnes Houser John Rice Irwin Harvey Kite Charlie Manning Alice...

  14. Oregon Fees for Underground Injection Control Program Fact Sheet...

    Open Energy Info (EERE)

    Fees for Underground Injection Control Program Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material:...

  15. Wetland Permit Application Fees 2015 | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Wetland Permit Application Fees 2015PermittingRegulatory GuidanceGuide...

  16. Sacramento Ordinance to Waive Fees for Solar Hot Water

    Broader source: Energy.gov [DOE]

    An ordinance suspending for the calendar years 2007-2009 all fees related to installations of solar water heaters on existing residences.

  17. Microsoft Word - FPDP Award Fee Plan 2015-2016 Rev 4 (Final)...

    Office of Environmental Management (EM)

    CONCUR: Reinhard Knerr AWARD FEE PLAN for Fluor Federal Services, Inc. Paducah ... period for the determination of earned fee is the Task Order period of performance. d. ...

  18. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    DE-AM09-05SR22405DE-AT30-07CC60011SL14 Contractor: Contract Number: Contract Type: Cost Plus Award Fee 357,223 597,797 894,699 EM Contractor Fee Site: Stanford Linear...

  19. Fee Determinations: Requirement to Obtain Acquisition Executive's Input

    Broader source: Energy.gov [DOE]

    On January 28, 2013, the Deputy Secretary issued the attached memorandum to the Department's senior officials requiring any Fee Determining Official whose contract falls under the cognizance of an Acquisition Executive to brief and obtain the input of that Acquisition Executive before determining earned fee under the contract.

  20. Magnetocaloric properties of rapidly solidified Dy{sub 3}Co alloy ribbons

    SciTech Connect (OSTI)

    Sánchez Llamazares, J. L. Flores-Zúñiga, H.; Sánchez-Valdés, C. F.; Álvarez-Alonso, Pablo

    2015-05-07

    The magnetic and magnetocaloric (MC) properties of melt-spun ribbons of the Dy{sub 3}Co intermetallic compound were investigated. Samples were fabricated in an Ar environment using a homemade melt spinner system at a linear speed of the rotating copper wheel of 40 ms{sup −1}. X-ray diffraction analysis shows that ribbons crystallize into a single-phase with the Fe{sub 3}C-type orthorhombic crystal structure. The M(T) curve measured at 5 mT reveals the occurrence of a transition at 32 K from a first to a second antiferromagnetic (AFM) state and an AFM-to-paramagnetic transition at T{sub N} = 43 K. Furthermore, a metamagnetic transition is observed below T{sub N}, but the magnetization change ΔM is well below the one reported for bulk alloys. Below 12 K, large inverse MC effect and hysteresis losses are observed. This behavior is related to the metamagnetic transition. For a magnetic field change of 5 T (2 T) applied along the ribbon length, the produced ribbons show a peak value of the magnetic entropy change ΔS{sub M}{sup peak} of −6.5 (− 2.1) Jkg{sup −1}K{sup −1} occurring close to T{sub N} with a full-width at half-maximum δT{sub FWHM} of 53 (37) K, and refrigerant capacity RC = 364 (83) Jkg{sup −1} (estimated from the product |ΔS{sub M}{sup peak}| × δT{sub FWHM})

  1. Ribbon-cutting Ceremony Set for New Radiological and Environmental Sciences Laboratory

    Broader source: Energy.gov [DOE]

    IDAHO FALLS— On Monday, Aug. 22, an open house and ribbon-cutting ceremony will be held to mark the opening of the U.S. Department of Energy’s new Radiological and Environmental Sciences Laboratory. The mission of the RESL facility is to provide measurement quality assurance for programs that protect workers, the public and the environment. The media is welcome to join us and tour the new facility.

  2. STUDY OF TWO SUCCESSIVE THREE-RIBBON SOLAR FLARES ON 2012 JULY 6

    SciTech Connect (OSTI)

    Wang, Haimin; Liu, Chang; Deng, Na; Xu, Yan; Jing, Ju; Zeng, Zhicheng; Cao, Wenda

    2014-01-20

    This Letter reports two rarely observed three-ribbon flares (M1.9 and C9.2) on 2012 July 6 in NOAA AR 11515, which we found using Hα observations of 0.''1 resolution from the New Solar Telescope and Ca II H images from Hinode. The flaring site is characterized by an intriguing ''fish-bone-like'' morphology evidenced by both Hα images and a nonlinear force-free field (NLFFF) extrapolation, where two semi-parallel rows of low-lying, sheared loops connect an elongated, parasitic negative field with the sandwiching positive fields. The NLFFF model also shows that the two rows of loops are asymmetric in height and have opposite twists, and are enveloped by large-scale field lines including open fields. The two flares occurred in succession within half an hour and are located at the two ends of the flaring region. The three ribbons of each flare run parallel to the magnetic polarity inversion line, with the outer two lying in the positive field and the central one in the negative field. Both flares show surge-like flows in Hα apparently toward the remote region, while the C9.2 flare is also accompanied by EUV jets possibly along the open field lines. Interestingly, the 12-25 keV hard X-ray sources of the C9.2 flare first line up with the central ribbon then shift to concentrate on the top of the higher branch of loops. These results are discussed in favor of reconnection along the coronal null line, producing the three flare ribbons and the associated ejections.

  3. THE SOLAR WIND AS A POSSIBLE SOURCE OF FAST TEMPORAL VARIATIONS OF THE HELIOSPHERIC RIBBON

    SciTech Connect (OSTI)

    Kucharek, H.; Lee, M. A.; Moebius, E.; Schwadron, N.; Fuselier, S. A.; McComas, D.; Wurz, P.; Pogorelov, N.; Borovikov, S.; Reisenfeld, D.; Funsten, H.

    2013-10-20

    We present a possible source of pickup ions (PUIs) the ribbon observed by the Interstellar Boundary EXplorer (IBEX). We suggest that a gyrating solar wind and PUIs in the ramp and in the near downstream region of the termination shock (TS) could provide a significant source of energetic neutral atoms (ENAs) in the ribbon. A fraction of the solar wind and PUIs are reflected and energized during the first contact with the TS. Some of the solar wind may be reflected propagating toward the Sun but most of the solar wind ions form a gyrating beam-like distribution that persists until it is fully thermalized further downstream. Depending on the strength of the shock, these gyrating distributions can exist for many gyration periods until they are scattered/thermalized due to wave-particle interactions at the TS and downstream in the heliosheath. During this time, ENAs can be produced by charge exchange of interstellar neutral atoms with the gyrating ions. In order to determine the flux of energetic ions, we estimate the solar wind flux at the TS using pressure estimates inferred from in situ measurements. Assuming an average path length in the radial direction of the order of a few AU before the distribution of gyrating ions is thermalized, one can explain a significant fraction of the intensity of ENAs in the ribbon observed by IBEX. With a localized source and such a short integration path, this model would also allow fast time variations of the ENA flux.

  4. Fiscal year 1999 Battelle performance evaluation and fee agreement

    SciTech Connect (OSTI)

    DAVIS, T.L.

    1998-10-22

    Fiscal Year 1999 represents the third fill year utilizing a results-oriented, performance-based evaluation for the Contractor's operations and management of the DOE Pacific Northwest National Laboratory (here after referred to as the Laboratory). However, this is the first year that the Contractor's fee is totally performance-based utilizing the same Critical Outcomes. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractor's performance for the period October 1, 1998 through September 30, 1999, as required by Clauses entitled ''Use of Objective Standards of Performance, Self Assessment and Performance Evaluation'' and ''Performance Measures Review'' of the Contract DE-ACO6-76RL01830. Furthermore, it documents the distribution of the total available performance-based fee and the methodology set for determining the amount of fee earned by the Contractor as stipulated within the causes entitled ''Estimated Cost and Annual Fee,'' ''Total Available Fee'' and ''Allowable Costs and Fee.'' In partnership with the Contractor and other key customers, the Department of Energy (DOE) Headquarters (HQ) and Richland Operations Office (RL) has defined four critical outcomes that serve as the core for the Contractor's performance-based evaluation and fee determination. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory.

  5. FY 2007 Fee Adequacy, Pub 2008 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In accordance with the Nuclear Waste Policy Act of 1982 (the Act), the costs for disposal of commercial spent nuclear fuel are to be funded by a fee of one mill (0.001) per ...

  6. FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor...

    Office of Environmental Management (EM)

    FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor: LATA Environmental Services of Kentucky, LLC Contract No.: DE-AC30-10CC40020 Award Period: October 1, 2013 through ...

  7. Award Fee Evaluation Period 5 Determination Scorecard Contractor...

    Office of Environmental Management (EM)

    5 Determination Scorecard Contractor: Fluor-BWXT Portsmouth LLC Contract: DE-AC30-10CC40017 Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September 30, 2015) ...

  8. Award Fee Evaluation Period 6 Determination Scorecard Contractor...

    Office of Environmental Management (EM)

    6 Determination Scorecard Contractor: Wastren-EnergX Mission Support, LLC Contract: DE-CI0000004 Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September 30, ...

  9. Idaho Water Right Applications, Forms, and Fees Webpage | Open...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho Water Right Applications, Forms, and Fees Webpage Abstract This webpage provides an overview...

  10. Spent fuel management fee methodology and computer code user's manual.

    SciTech Connect (OSTI)

    Engel, R.L.; White, M.K.

    1982-01-01

    The methodology and computer model described here were developed to analyze the cash flows for the federal government taking title to and managing spent nuclear fuel. The methodology has been used by the US Department of Energy (DOE) to estimate the spent fuel disposal fee that will provide full cost recovery. Although the methodology was designed to analyze interim storage followed by spent fuel disposal, it could be used to calculate a fee for reprocessing spent fuel and disposing of the waste. The methodology consists of two phases. The first phase estimates government expenditures for spent fuel management. The second phase determines the fees that will result in revenues such that the government attains full cost recovery assuming various revenue collection philosophies. These two phases are discussed in detail in subsequent sections of this report. Each of the two phases constitute a computer module, called SPADE (SPent fuel Analysis and Disposal Economics) and FEAN (FEe ANalysis), respectively.

  11. Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2014 - September 30, 2015 Basis of Evaluation: Award Fee Plan The contractor is required to provide, operate and maintain an armed and uniformed protective force for the physical protection of United States Department of Energy (DOE) security interests and other such related duties at the Savannah River Site (SRS). The

  12. DOE - NNSA/NFO -- Nuclear Testing Archive Fee Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Testing Archive > Fee Schedule NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office Nuclear Testing Archive (NTA) Fee Schedule The U.S. Department of Energy National Nuclear Security Administration Nuclear Testing Archive (NTA) is a centralized repository of publicly releasable documents on the subject of the U.S. Nuclear Weapons Testing Program. The Nuclear Testing Archive is operated for the NNSA by NSTec. Normal services provided to the public by the Nuclear Testing

  13. Remarks by Federal Blue Ribbon Commission J. David Jameson Atlanta, GA

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Blue Ribbon Commission J. David Jameson Atlanta, GA October 18, 2011 Good Morning. I am David Jameson. I am President and CEO of the Greater Aiken, South Carolina, Chamber of Commerce. I am here today in my capacity as current Chairman of the SRS Community Reuse Organization. The SRSCRO is a non-profit regional group supporting economic diversification and job creation in a five-county in Georgia and South Carolina near the Department of Energy's Savannah River Site. We are unique among

  14. Remarks by Rick McLeod Yucca Mountain Blue Ribbon Panel

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rick McLeod Yucca Mountain Blue Ribbon Panel Executive Director March 25, 2010 Savannah River Site Community Reuse Organization 1 GOOD MORNING. I AM RICK MCLEOD...EXECUTIVE DIRECTOR OF THE SAVANNAH RIVER SITE COMMUNITY REUSE ORGANIZATION. OURS IS A NON-PROFIT REGIONAL GROUP SUPPORTING JOB CREATION IN A FIVE-COUNTY REGION OF GEORGIA AND SOUTH CAROLINA NEAR D-O-E'S SAVANNAH RIVER SITE. WE ARE UNIQUE AMONG D-O-E COMMUNITIES IN THAT OUR AREA OF INTEREST COVERS TWO STATES. OUR MISSION IS TWO-FOLD -

  15. Accumulated destructive effect of nanosecond repetitive voltage pulses on the insulated coatings of Fe-based nanocrystalline ribbon

    SciTech Connect (OSTI)

    Zhang, Yu; Liu, Jinliang

    2013-03-11

    Fe-based nanocrystalline ribbon is widely employed in pulsed power devices and accelerators. A temperature accumulation model is put forward to explain the accumulated destructive effect of discharge plasma bombardment on the TiO{sub 2} coatings of nanocrystalline ribbon under 50 Hz/100 ns voltage pulses. Experimental results revealed that the plasma channel expansion caused by air breakdown in the coating crack heated the coating repetitively, and the coating temperature was increased and accumulated around the crack. The fact that repetitive voltage pulses were more destructive than a single pulse with the same amplitude was caused by the intensified coating ablation under the temperature accumulation effect.

  16. Mechanically stable, high aspect ratio, multifilar, wound, ribbon-type conductor and method for manufacturing same

    DOE Patents [OSTI]

    Cottingham, James G.

    1987-01-01

    A mechanically stable, wound, multifilar, ribbon-type conductor having a cross-sectional aspect ratio which may be greater than 12:1, comprising a plurality of conductive strands wound to form a flattened helix containing a plastic strip into which the strands have been pressed so as to form a bond between the strip and the strands. The bond mechanically stabilizes the conductor under tension, preventing it from collapsing into a tubular configuration. In preferred embodiments the plastic strip may be polytetrafluoroethylene, and the conductive strands may be formed from a superconductive material. Conductors in accordance with the present invention may be manufactured by winding a plurality of conductive strands around a hollow mandrel; the cross-section of a hollow mandrel; the cross-section of the mandrel continuously varying from substantially circular to a high aspect ratio elipse while maintaining a constant circumference. The wound conductive strands are drawn from the mandrel as a multifilar helix while simultaneously a plastic strip is fed through the hollow mandrel so that it is contained within the helix as it is withdrawn from the mandrel. The helical conductor is then compressed into a ribbon-like form and the strands are bonded to the plastic strip by a combination of heat and pressure.

  17. Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination...

    Office of Environmental Management (EM)

    DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015 Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September ...

  18. Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of the adequacy of the fee being paid by nuclear power utilities...

  19. Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee |

    Energy Savers [EERE]

    Department of Energy Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee I adopt and approve the attached annual determination of the Director, Office of Standard Contract Management, that there is no reasonable basis at this time to conclude that either excess or insufficient funds are being collected and thus will not propose an adjustment to the fee to Congress; the fee will, therefore, remain at

  20. Anisotropic hot deformed magnets prepared from Zn-coated MRE-Fe-B ribbon powder (MRE?=?Nd?+?Y?+?Dy)

    SciTech Connect (OSTI)

    Tang, W; Zhou, L; Sun, K W; Dennis, K W; Kramer, M J; Anderson, I E; McCallum, R W

    2014-05-07

    Milled melt-spun ribbon flake of MRE-Fe-B coated with Zn coating using a vapor transport technique was found to have significant increase in coercivity without degrading the magnetization when the Zn thickness and heat treatment were optimized. Magnetic measurements show that 0.51?wt.?% Zn coating increases the coercivity about 1?kOe over the initial ribbon powder. After vacuum hot deformation (VHD), the VHD magnet with Zn coating of 0.5?wt.?% results in a nearly 3?kOe higher coercivity than an un-coated alloy magnet. An optimized VHD magnet with 0.5?wt.?% Zn coating obtains a coercivity of 11.2?kOe and (BH)max of 23.0 MGOe, respectively. SEM and TEM microstructures analysis demonstrates that the Zn coating on the surface of ribbon powder has diffused along the intergranular boundaries after the ribbon powder was annealed at 750?C for 30?min or was hot deformed at 700750?C.

  1. Innovative Approaches to Low-Cost Module Manufacturing of String Ribbon Si PV Modules; Final Subcontract Report, March 2002 - January 2005

    SciTech Connect (OSTI)

    Hanoka, J. I.

    2005-10-01

    As a result of this work, Evergreen Solar, Inc., is now poised to take String Ribbon technology to new heights. In the ribbon growth area, Project Gemini-the growth of dual ribbons from a single crucible-has reached or exceeded all the manufacturing goals set for it. This project grew from an R&D concept to a production pilot phase and finally to a full production phase, all within the span of this subcontract. A major aspect of the overall effort was the introduction of controls and instrumentation as in-line diagnostic tools. In the ribbon production area, the result has been a 12% increase in yields, a 10% increase in machine uptime, and the flattest ribbon ever grown at Evergreen. In the cell area, advances in process development and robotic handling of Gemini wafers have contributed, along with the advances in crystal growth, to a yield improvement of 6%. Particularly noteworthy in the cell area was the refinement of the no-etch process whereby the as-grown ribbon surface could be controlled sufficiently to allow this process to succeed as well as it has. This process obviates any need for wet chemistry or etching between ribbon growth and diffusion.

  2. The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

    SciTech Connect (OSTI)

    Voegele, Michael D. [Consultant, Nye County Nuclear Waste Repository Project Office, 7404 Oak Grove Ave, Las Vegas, NV 89117 (United States)] [Consultant, Nye County Nuclear Waste Repository Project Office, 7404 Oak Grove Ave, Las Vegas, NV 89117 (United States); Vieth, Donald [1154 Chelttenham Place, Maineville, OH 45039 (United States)] [1154 Chelttenham Place, Maineville, OH 45039 (United States)

    2013-07-01

    The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should be implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)

  3. Award Fee Determination Scorecard Contractor: Advanced Technologies and Laboratories (ATL) International Inc.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Advanced Technologies and Laboratories (ATL) International Inc. Contract: Laboratory Analytical Services and Testing Contract Contract Number: DE-AC27-10RV15051 Award Fee Period: January 1, 2015 to November 21, 2015 Basis of Evaluation: January 1, 2015 to November 21, 2015 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available (PBI and SEA): $789,765.60 Award Fee Earned (PBI and SEA): $781,078.18 (98.9%) Award Fee Area Adjectival Ratings for each Performance Based Incentives

  4. Office of Inspector General audit report on Westinghouse Savannah River Company`s withdrawal of fees

    SciTech Connect (OSTI)

    1999-04-01

    As the operator of the Department`s Savannah River Site, Westinghouse Savannah River Company (Westinghouse) receives three types of fees: (1) award fees commensurate with the overall performance rating, (2) Performance Based Incentive (PBI) fees for achieving measurable goals or defined tasks as specified in annual operating plans, and (3) Cost Reduction Incentive Program (CRIP) fees for making improvements in site operations that reduce total contract costs. The Department`s Contracting Officer notifies Westinghouse when fees are earned, and Westinghouse withdraws the authorized amounts from the Department`s letter-of-credit account. The audit objective was to determine whether Westinghouse withdrew the appropriate amount of fees from the letter-of-credit account in Fiscal Years (FY) 1997 an 1998.

  5. DOE Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee

    Broader source: Energy.gov [DOE]

    As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee.

  6. Blue Ribbon Commission on America's Nuclear Future: Report to the Secretary of Energy

    SciTech Connect (OSTI)

    2012-01-01

    Preamble The Blue Ribbon Commission on America’s Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new strategy. It was co-chaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other Commissioners are Mr. Mark H. Ayers, the Hon. Vicky A. Bailey, Dr. Albert Carnesale, Sen. Pete Domenici, Ms. Susan Eisenhower, Sen. Chuck Hagel, Mr. Jonathan Lash, Dr. Allison M. Macfarlane, Dr. Richard A. Meserve, Dr. Ernest J. Moniz, Dr. Per Peterson, Mr. John Rowe, and Rep. Phil Sharp. The Commission and its subcommittees met more than two dozen times between March 2010 and January 2012 to hear testimony from experts and stakeholders, to visit nuclear waste management facilities in the United States and abroad, and to discuss the issues identified in its Charter. Additionally, in September and October 2011, the Commission held five public meetings, in different regions of the country, to hear feedback on its draft report. A wide variety of organizations, interest groups, and individuals provided input to the Commission at these meetings and through the submission of written materials. Copies of all of these submissions, along with records and transcripts of past meetings, are available at the BRC website (www.brc.gov). This report highlights the Commission’s findings and conclusions and presents recommendations for consideration by the Administration and Congress, as well as interested state, tribal and local governments, other stakeholders, and the public.

  7. Fact #901: November 30, 2015 States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue- Dataset

    Broader source: Energy.gov [DOE]

    Excel file and dataset for States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue

  8. The influence of microstructure on magnetic properties of nanocrystalline Fe-Pt-Nb-B permanent magnet ribbons

    SciTech Connect (OSTI)

    Randrianantoandro, N.; Greneche, J. M.; Crisan, A. D.; Crisan, O.; Marcin, J.; Kovac, J.; Hanko, J.; Skorvanek, I.; Svec, P.; Chrobak, A.

    2010-11-15

    A FePt-based hard-magnetic nanocomposite of exchange spring type was prepared by isothermal annealing of melt-spun Fe{sub 52}Pt{sub 28}Nb{sub 2}B{sub 18} (atomic percent) ribbons. The relationship between microstructure and magnetic properties was investigated by qualitative and quantitative structural analysis based on the x-ray diffraction, transmission electron microscopy, and {sup 57}Fe Moessbauer spectrometry on one hand and the superconducting quantum interference device magnetometry on the other hand. The microstructure consists of L1{sub 0}-FePt hard-magnetic grains (15-45 nm in diameter) dispersed in a soft magnetic medium composed by A1 FePt, Fe{sub 2}B, and boron-rich (FeB)PtNb remainder phase. The ribbons annealed at 700 deg. C for 1 h exhibit promising hard-magnetic properties at room temperature: M{sub r}/M{sub s}=0.69; H{sub c}=820 kA/m and (BH){sub max}=70 kJ/m{sup 3}. Strong exchange coupling between hard and soft magnetic phases was demonstrated by a smooth demagnetizing curve and positive {delta}M-peak in the Henkel plot. The magnetic properties measured from 5 to 750 K reveals that the hard characteristics remains rather stable up to 550 K, indicating a good prospect for the use of these permanent magnets in a wide temperature range.

  9. Mechanically stable, high-aspect-ratio, multifilar, wound, ribbon-type conductor and method for manufacturing same

    DOE Patents [OSTI]

    Cottingham, J.G.

    1982-03-15

    A mechanically stable, wound, multifilar, ribbon-type conductor is described having a cross-sectional aspect ratio which may be greater than 12:1, comprising a plurality of conductive strands wound to form a flattened helix containing a plastic strip into which the strands have been pressed so as to form a bond between the strip and the strands. The bond mechanically stabilizes the conductor under tension, preventing it from collapsing into a tubular configuration. In preferred embodiments the plastic strip may be polytetrafluoroethylene, and the conductive strands may be formed from a superconductive material. Conductors in accordance with the present invention may be manufactured by winding a plurality of conductive strands around a hollow mandrel; the cross-section of a hollow mandrel; the cross-section of the mandrel continuously varying from substnatially circular to a high aspect ratio elipse while maintaining a constant circumference. The wound conductive strands are drawn from the mandrel as a multifilar helix while simultaneously a plastic strip is fed through the hollow mandrel so that it is contained within the helix as it is withdrawn from the mandrel. The helical conductor is then compressed into a ribbon-like form and the strands are bonded to the plastic strip by a combination of heat and pressure.

  10. Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for

    Energy Savers [EERE]

    April to September 2015 | Department of Energy Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015 Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015 DOE's Oak Ridge Environmental Management Office told URS | CH2M Oak Ridge LLC (UCOR) in a letter that it had completed its evaluation of the company's performance for the award fee period of April to September 2015 and determined that UCOR earned a

  11. FY 1997 performance evaluation and incentive fee agreement. Annual report

    SciTech Connect (OSTI)

    1997-04-01

    FY 1997 represents the second full year utilizing a results-oriented, performance-based contract. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of PNNL performance for Oct. 1, 1996-Sept. 30, 1997, as required by Articles H-24 and H-25 of the contract. Section I provides the information regarding the determination of the overall performance rating for PNNL. In Section II, six critical outcomes were defined that serve as basis for overall management of PNNL: environmental molecular sciences laboratory, environmental technology, scientific excellence, environment/safety & health operations, leadership/management, and economic development (create new businesses). Section III describes the commitments for documenting and reporting PNNL self-evaluation. In Section IV, it is stated that discussions regarding FY97 fee are still ongoing.

  12. 2011 SECRETARIAL DETERMINATION OF THE ADEQUACY OF THE NUCLEAR WASTE FUND FEE

    Broader source: Energy.gov [DOE]

    As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Office of Standard Contract...

  13. 16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security...

    Open Energy Info (EERE)

    LibraryAdd to library Legal Document- RegulationRegulation: 16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security RequirementsLegal Abstract These regulations...

  14. GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions

    Broader source: Energy.gov [DOE]

    Consistent with the Administration's commitment to transparency, DOE General Counsel Scott Blake Harris has decided that all future determinations as to the adequacy of the Nuclear Waste Fund fee...

  15. City of Santa Monica- Building Permit Fee Waiver for Solar Projects

    Broader source: Energy.gov [DOE]

    In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff...

  16. H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to Perform Work on State...

  17. Title 43 CFR 3203.12 What Fees Must I Pay to Nominate Lands?...

    Open Energy Info (EERE)

    .12 What Fees Must I Pay to Nominate Lands? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR...

  18. NMAC 20.2.71 Air Quality Operating Permit Emissions Fees | Open...

    Open Energy Info (EERE)

    1 Air Quality Operating Permit Emissions Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NMAC 20.2.71 Air Quality...

  19. I.C. 42-221 - Appropriation of Water Fees | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: I.C. 42-221 - Appropriation of Water FeesLegal Abstract This statutory section provides for...

  20. Award Fee Determination Scorecard Contractor: G4S Government Solutions, Inc. - Wackenhut Services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: G4S Government Solutions, Inc. - Wackenhut Services Incorporated (WSI) Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2013 - September 30, 2014 Basis of Evaluation: Award Fee Plan The contractor is required to provide, operate, and maintain an armed and uniformed protective force for the physical protection of U.S. Department of Energy (DOE) security interests and other such related duties at

  1. Reclamation fee on coal production: an example of federal regulatory taxation

    SciTech Connect (OSTI)

    Reese, C.E.

    1983-09-01

    The coal mining reclamation fee is part of the federal government's efforts to regulate the strip mining of coal and to use proceeds from the fee for land use and pollution control problems associated with abandoned mines. Authorized by the 1977 Surface Mining Contol and Reclamation Act rather than the Internal Revenue Code, the exaction is still shown to be both a regulatory and a severance tax. 41 references. (DCK)

  2. Waste Isolation Pilot Plant Contractor Receives 86 Percent of Available Fee

    Broader source: Energy.gov [DOE]

    CARLSBAD, N.M. – EM’s Carlsbad Field Office (CBFO) recently issued the fiscal year 2015 fee award determination for Nuclear Waste Partnership (NWP), and it shows the Waste Isolation Pilot Plant (WIPP) management and operations contractor earned almost 86 percent — or about $11.7 million of more than $13.6 million — of the fee available for the performance period.

  3. Cost-plus-award-fee contracts-Federal Acquisition Circular 2005-37

    Broader source: Energy.gov [DOE]

    With the issuance of Federal Acquisition Circular 2005-37, the FAR now requires, in addition to previous requirements, several new actions in using and administering a cost-plus-award-fee contract. Attached are the pre and post Federal Acquisition Circular 2005-37 requirements for using and administering cost-plus-award-fee contracts. Changes to current Departmental guidance are being considered and will be disseminated in future communications.

  4. Effluent fees: policy considerations on a source of revenue for infrastructure financing. Technical report

    SciTech Connect (OSTI)

    Casey, P.

    1988-01-01

    This project is part of the National Network for Environmental Management Studies conducted under the auspices of the Office of Cooperative Environmental Management - U.S. Environmental Protection Agency. With the phasing out of EPA's construction grants program and the implementation of State Revolving Funds (SRF's), it appears that more money will be needed for the financing of waste-water treatment facilities in the next twenty years. Infrastructure needs for waste-water treatment facilities will increase significantly due to required replacement and upgrading needs, while user fees may be significantly understated due to years of capital subsidies. With Federal seed capital for the SRF's stopping after 1994, alternative sources of funding will be necessary. An effluent fee program could both offer a way to make the polluter pay and provide a reliable financing mechanism for the SRF's. The paper discusses the experience of effluent fees in Europe, and proposes an effluent fee program that would provide needed capital to the State Revolving Fund. The fee would be tied into the National Pollutant Discharge Elimination System permits through gradual implementation. Various options for setting the fee and enforcement procedures are also discussed.

  5. R01002

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at Savannah River Site Flag Ribbon Art Secretary Richardson announced today his decision to extend the contract with Washington Group International's Westinghouse Savannah River ...

  6. ," Excise"," LUST Fee ",," Total",," Excise"," LUST Fee ",," Total",,"Notes"

    U.S. Energy Information Administration (EIA) Indexed Site

    Federal and state motor fuels taxes[1] " ," Gasoline ",,,,," Diesel" ," Excise"," LUST Fee ",," Total",," Excise"," LUST Fee ",," Total",,"Notes" "Federal",0.183,0.001,,0.184,,0.243,0.001,,0.244,,"Leaking Underground Storage Tank (LUST) fee: $0.001/gal. " ," Gasoline ",,,,," Diesel" ,"State tax","Other taxes & Fees[2] ","Total

  7. Anomalous magnetic configuration of Mn{sub 2}NiAl ribbon and the role of hybridization in the martensitic transformation of Mn{sub 50}Ni{sub 50−x}Al{sub x} ribbons

    SciTech Connect (OSTI)

    Zhao, R. B.; Zhao, D. W.; Li, G. K.; Ma, L. E-mail: houdenglu@mail.hebtu.edu.cn; Zhen, C. M.; Hou, D. L. E-mail: houdenglu@mail.hebtu.edu.cn; Wang, W. H.; Liu, E. K.; Chen, J. L.; Wu, G. H.

    2014-12-08

    The magnetic configuration of Mn{sub 2}NiAl ribbon has been investigated. In contrast to Ni{sub 2}MnAl, the compound Mn{sub 2}NiAl with considerable disorder does exhibit ferromagnetism and, due to exchange interaction competition, both ferromagnetic and antiferromagnetic moment orientations can coexist between nearest neighbor Mn atoms. This is unexpected in Heusler alloys. Regarding the mechanism of the martensitic transformation in Mn{sub 50}Ni{sub 50−x}Al{sub x}, it is found that increasing the Al content results in an unusual change in the lattice constant, a decrease of the transformation entropy change, and enhancement of the calculated electron localization. These results indicate that the p-d covalent hybridization between Mn (or Ni) and Al atoms gradually increases at the expense of the d-d hybridization between Ni and Mn atoms. This leads to an increased stability of the austenite phase and a decrease of the martensitic transformation temperature. For 11 ≤ x ≤ 14, Mn{sub 50}Ni{sub 50−x}Al{sub x} ferromagnetic shape memory alloys are obtained.

  8. Blue Ribbon Commission, Yucca Mountain Closure, Court Actions - Future of Decommissioned Reactors, Operating Reactors and Nuclear Power - 13249

    SciTech Connect (OSTI)

    Devgun, Jas S.

    2013-07-01

    Issues related to back-end of the nuclear fuel cycle continue to be difficult for the commercial nuclear power industry and for the decision makers at the national and international level. In the US, the 1982 NWPA required DOE to develop geological repositories for SNF and HLW but in spite of extensive site characterization efforts and over ten billion dollars spent, a repository opening is nowhere in sight. There has been constant litigation against the DOE by the nuclear utilities for breach of the 'standard contract' they signed with the DOE under the NWPA. The SNF inventory continues to rise both in the US and globally and the nuclear industry has turned to dry storage facilities at reactor locations. In US, the Blue Ribbon Commission on America's Nuclear Future issued its report in January 2012 and among other items, it recommends a new, consent-based approach to siting of facilities, prompt efforts to develop one or more geologic disposal facilities, and prompt efforts to develop one or more consolidated storage facilities. In addition, the March 2011 Fukushima Daiichi accident had a severe impact on the future growth of nuclear power. The nuclear industry is focusing on mitigation strategies for beyond design basis events and in the US, the industry is in the process of implementing the recommendations from NRC's Near Term Task Force. (authors)

  9. U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site

    SciTech Connect (OSTI)

    1995-08-03

    During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

  10. DOE Rates EM’s Savannah River Site Contractor as ‘Very Good’ in Fee Determination Scorecard

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – In its award fee determination scorecard for fiscal year 2015, DOE gave the Savannah River Site’s (SRS) management and operations contractor an overall “very good” rating, allowing the company to receive $37.8 million, or 82.7 percent of its total fee of $45.7 million.

  11. Section L Attachment I - Summary and Fee Sheet Amendment 000002.xlsx

    National Nuclear Security Administration (NNSA)

    I Summary and Fee Sheet Amendment 000002 Nevada National Security Site Management and Operating (M&O) Contract PROPOSED 2017 Mgt Team Costs 2018 Mgt Team Costs Subtotal $0 FEE CLIN 0001 - Management and Operation of NNSS Base Term Year 1 Year 2 Year 3 Year 4 Year 5 Option Term Year 1 Year 2 Year 3 Year 4 Year 5 Subtotal $0 CLIN 0002 - Strategic Partnership Program Base Term Year 1 Year 2 Year 3 Year 4 Year 5 Option Term Year 1 Year 2 Year 3 Year 4 Year 5 Subtotal $0 TOTAL ALL $0 Mgt Team

  12. Paducah and DUF6 Award Fees Determined for Three Prime Contracts |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy and DUF6 Award Fees Determined for Three Prime Contracts Paducah and DUF6 Award Fees Determined for Three Prime Contracts April 27, 2016 - 12:45pm Addthis A Swift & Staley heavy equipment operator loads a salt spreader at Paducah’s C-732 Salt Storage Facility. A Swift & Staley heavy equipment operator loads a salt spreader at Paducah's C-732 Salt Storage Facility. LEXINGTON, Ky. - EM has completed final performance evaluations of two prime contractors in

  13. Office of Inspector General report on audit of Department of Energy management and operating contractor available fees

    SciTech Connect (OSTI)

    1996-05-01

    The Office of Procurement and Assistance Management has proposed changes to the method used to annually calculate and negotiate ``for profit`` management and operating contractor available fees. This proposal will increase contractor fees in exchange for the contractor`s purported assumption of additional risk. In 1991, the Department, through the Accountability Rule, increased contractor fees as an incentive to improve contractor performance and accountability. Despite the lack of measurable benefits of this effort, the Department is crafting a new fee policy which will, depending upon how it is executed, increase fees above the amount provided through the Accountability Rule as an incentive to the Department`s management and operating contractors. The objective of the audit was to determine whether the Department`s proposed change to the fee structure for determining management and operating contractor fees will be cost effective. This report describes the study`s approach, its findings and recommendations, management and auditor comments, and includes appendices with further data.

  14. RESL Ribbon Cutting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    INL Research Center in Idaho Falls, replaces an aging facility at the INL Site. Click on image to enlarge Click on image to enlarge Editorial Date August 25, 2010 By Brad Bugger...

  15. Ribbon cutting makes history

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    being built at the nation's capital were enlightening. I am sure Lawler Wood and Turner Construction personnel in the room must have swelled with pride to hear such grand...

  16. Equity of commercial low-level radioactive waste disposal fees. Report to Congress

    SciTech Connect (OSTI)

    1998-02-01

    In the Report accompanying the Fiscal Year 1997 Senate Energy and Water Development Appropriations Bill, the Senate Appropriations Committee directed the Department of Energy (DOE) to prepare a study of the costs of operating a low-level radioactive waste (LLW) disposal facility such as the one at Barnwell, South Carolina, and to determine whether LLW generators are paying equitable disposal fees. The disposal costs of four facilities are reviewed in this report, two operating facilities and two planned facilities. The operating facilities are located at Barnwell, South Carolina, and Richland, Washington. They are operated by Chem-Nuclear, LLC, (Chem-Nuclear), and US Ecology, Inc., (US Ecology), respectively. The planned facilities are expected to be built at Ward Valley, California, and Sierra Blanca, Texas. They will be operated by US Ecology and the State of Texas, respectively. This report found that disposal fees vary significantly among facilities for a variety of reasons. However, the information suggests that at each disposal facility, LLW generators pay equitable disposal fees.

  17. EM's Oak Ridge Office Contractor Scores High in Latest Award Fee Evaluation

    Broader source: Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM gave URS | CH2M Oak Ridge LLC (UCOR) a score of nearly 96 percent, allowing the contractor to earn over $4.4 million of the available fee of more than $4.6 million for the period from April to September 2015. UCOR is responsible for cleaning up the East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, as well as other select sites on DOE’s Oak Ridge Reservation under a contract valued at $2.4 billion.

  18. Magnetic properties of bulk, and rapidly solidified nanostructured (Nd1-xCex)2Fe14-yCoyB ribbons

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Pathak, Arjun K.; Khan, M.; Gschneidner, Jr., K. A.; McCallum, R. W.; Zhou, L.; Sun, K.; Kramer, M. J.; Pecharsky, V. K.

    2015-11-06

    Magnetic properties of Ce and Co co-doped (Nd1-xCex)2Fe14-yCoyB compounds have been investigated both in bulk polycrystalline and rapidly solidified nanostructured ribbon forms. For certain Ce concentrations the materials exhibit spin re-orientation transitions below 140 K. The Curie temperatures, saturation magnetizations, and other magnetic properties relevant for applications as permanent magnets are controlled by Ce and Co substitutions for Nd and Fe, respectively. Most importantly, the results show that Ce, Co co-doped compounds are excellent replacements for several Dy-based high performance permanent magnets (dysprosium is one of the critical elements and is, therefore, in short supply). As a result, the highmore » temperature (>375 K) magnetic properties for Nd–Ce–Fe–Co–B based alloys show promise not only as a replacement for Dy-doped Nd2Fe14B permanent magnets, but the new alloys also require significantly lower amounts of Nd, which too is the critical element that can be replaced by a more abundant Ce.« less

  19. FOIA FEES

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2. Requestors who are representative of the news media: Responsible for reproduction costs after the first 100 pages. 3. Educational and non-commercial scientific institution ...

  20. Societal-Equity-Enhancing Criteria and Facility-Host Incentives Supporting Five Key Elements in the January 2012 Blue Ribbon Commission Report - 13015

    SciTech Connect (OSTI)

    Eriksson, Leif G.; Dials, George E.; George, Critz H.

    2013-07-01

    In February 2009, the Obama Administration announced it would abandon USA's only candidate SNF/HLW-disposal facility since 1987. In 2010, all related activities were stopped and the Blue Ribbon Commission on America's Nuclear Future was established 'to recommend a new strategy for managing the back end of the nuclear fuel cycle', which it did in January 2012, emphasizing eight key elements. However, Key Element 1, 'A new, consent-based approach to siting future nuclear facilities', is qualitative/indeterminate rather than quantitative/measurable. It is thus highly-susceptible to semantic permutations that could extend rather than, as intended, expedite the siting of future nuclear facilities unless it also defines: a) Whose consent is needed?; and b) What constitutes consent? The following 'generic', radiation-risk- and societal-equity-based criteria address these questions: 1. Identify areas affected by projected radiation and other health risks from: a. The proposed nuclear facility (facility stakeholders); and b. The related nuclear-materials-transportation routes (transportation stakeholders); then 2. Surround each stakeholder area with a buffer zone and use this enlarged foot print to identify: a. Stakeholder hosts; and b. Areas not hosting any stakeholder category (interested parties). 3. Define 'consent-based' as being at least 60 percent of the 'population' in the respective stakeholder category and apply this yardstick to both 'in favor' and 'against' votes. Although criteria 1 and 2 also need facility-based definitions to make Key Element 1 measurable, the described siting approach, augmented by related facility-host incentives, would expedite the schedule and reduce the cost for achieving Key Elements 4-6 and 8, politics permitting. (authors)

  1. SR0111

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (803) 725-2889 Dept. Of Energy Kicks Off Its 2001 Combined Federal Campaign Flag Ribbon Art AIKEN, SC - DOE employees at SRS begin their 2001 CFC with an Opening Program...

  2. Defect-Tolerant Diffusion Channels for Mg2+ Ions in Ribbon-Type Borates: Structural Insights into Potential Battery Cathodes MgVBO4 and Mgx Fe2–xB2O5

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Bo, Shou-Hang; Grey, Clare P.; Khalifah, Peter G.

    2015-06-10

    The reversible room temperature intercalation of Mg2+ ions is difficult to achieve, but may offer substantial advantages in the design of next-generation batteries if this electrochemical process can be successfully realized. Two types of quadruple ribbon-type transition metal borates (MgxFe2-xB2O5 and MgVBO4) with high theoretical capacities (186 mAh/g and 360 mAh/g) have been synthesized and structurally characterized through the combined Rietveld refinement of synchrotron and time-of-flight neutron diffraction data. Neither MgVBO4 nor MgxFe2-xB2O5 can be chemically oxidized at room temperature, though Mg can be dynamically removed from the latter phase at elevated temperatures (approximately 200 - 500 °C). Findingsmore »show that Mg diffusion in the MgxFe2-xB2O5 structure is more facile for the inner two octahedral sites than for the two outer octahedral sites in the ribbons, a result supported by both the refined site occupancies after Mg removal and by bond valence sum difference map calculations of diffusion paths in the pristine material. Mg diffusion in this pyroborate MgxFe2-xB2O5 framework is also found to be tolerant to the presence of Mg/Fe disorder since Mg ions can diffuse through interstitial channels which bypass Fe-containing sites.« less

  3. Defect-Tolerant Diffusion Channels for Mg2+ Ions in Ribbon-Type Borates: Structural Insights into Potential Battery Cathodes MgVBO4 and Mgx Fe2–xB2O5

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Bo, Shou-Hang; Grey, Clare P.; Khalifah, Peter G.

    2015-06-10

    The reversible room temperature intercalation of Mg2+ ions is difficult to achieve, but may offer substantial advantages in the design of next-generation batteries if this electrochemical process can be successfully realized. Two types of quadruple ribbon-type transition metal borates (MgxFe2-xB2O5 and MgVBO4) with high theoretical capacities (186 mAh/g and 360 mAh/g) have been synthesized and structurally characterized through the combined Rietveld refinement of synchrotron and time-of-flight neutron diffraction data. Neither MgVBO4 nor MgxFe2-xB2O5 can be chemically oxidized at room temperature, though Mg can be dynamically removed from the latter phase at elevated temperatures (approximately 200 - 500 °C). Findingsmore » show that Mg diffusion in the MgxFe2-xB2O5 structure is more facile for the inner two octahedral sites than for the two outer octahedral sites in the ribbons, a result supported by both the refined site occupancies after Mg removal and by bond valence sum difference map calculations of diffusion paths in the pristine material. Mg diffusion in this pyroborate MgxFe2-xB2O5 framework is also found to be tolerant to the presence of Mg/Fe disorder since Mg ions can diffuse through interstitial channels which bypass Fe-containing sites.« less

  4. Bi{sub 2}O{sub 3}CuOP{sub 2}O{sub 5} system: Two novel compounds built from the intergrowths oxocentered polycationic 1D-ribbons

    SciTech Connect (OSTI)

    Colmont, Marie; Endara, Diana; Aliev, Almaz; Terryn, Christine; Huv, Marielle; Mentr, Olivier

    2013-07-15

    Single crystals of two novel bismuth copper oxyphosphates were grown from a unique melt. They have been structurally characterized by means of single crystal X-Ray Diffraction (XRD). Bi{sub 29.4}Cu{sub 9.29}O{sub 32}(PO{sub 4}){sub 16}Cu{sub 2.63} (1) is orthorhombic, space group Pca2{sub 1}, a=33.0549(2)A, b=11.6991(4)A and c=5.2902(2)A, R{sub 1}=0.059 and wR{sub 2}=0.061. Bi{sub 37.2}Cu{sub 18.8}O{sub 44}(PO{sub 4}){sub 24}Cu{sub 5} (2) is orthorhombic, space group Pna2{sub 1}, a=11.6010(3)A, b=47.4384(5)A and c=5.267(2)A, R{sub 1}=0.0940 and wR{sub 2}=0.0981. Both compounds are formed of similar 1D building units (BUs) organized into two different 3D regular intergrowths mediated by phosphate groups. Here, the so-called 1D-BUs are infinite ribbons formed by edge-sharing O(Bi,M){sub 4} tetrahedra with n=4 and n=3 tetrahedra-wide units. Both compounds were analyzed from the viewpoint of their relationship with the parent ?-Bi{sub 2}O{sub 3} fluorite-like structure, where phosphorus atoms substitutes for some Bi sites. A non-exhaustive review of the related structural types is given. We have checked by second harmonic generacy (SHG) microscopy that the two non-centrosymmetric structures (despite polar subunits) lead to SHG before the samples are irreversibly damaged. - Graphical abstract: This paper reports the crystal structure of two new bismuth oxophosphate compounds. Both are built on the association of n=3 and 4 building unit ribbons surrounded by isolated PO4 tetrahedra and tunnels hosting Cu{sup 2+} cations. They come in addition to the numerous Bi-based compounds already pointed out. Once more, this is the proof of the richness of this crystal system. - Highlights: Two new bismuth oxophosphates were synthesized. Crystal structure were solved thanks to single crystal X-Ray diffraction. They show two different associations of n=3 and 4 ribbons built on [O,(Bi,M){sub 4}] tetrahedral sharing edges and surrounded by isolated PO4 groups. SHG microscopy confirm the NCS character of both compounds. The family of bismuth oxophosphate compounds contained several structures already pointed out but also still to be evidenced.

  5. Magnetic properties of bulk, and rapidly solidified nanostructured (Nd1-xCex)2Fe14-yCoyB ribbons

    SciTech Connect (OSTI)

    Pathak, Arjun K.; Khan, M.; Gschneidner, Jr., K. A.; McCallum, R. W.; Zhou, L.; Sun, K.; Kramer, M. J.; Pecharsky, V. K.

    2015-11-06

    Magnetic properties of Ce and Co co-doped (Nd1-xCex)2Fe14-yCoyB compounds have been investigated both in bulk polycrystalline and rapidly solidified nanostructured ribbon forms. For certain Ce concentrations the materials exhibit spin re-orientation transitions below 140 K. The Curie temperatures, saturation magnetizations, and other magnetic properties relevant for applications as permanent magnets are controlled by Ce and Co substitutions for Nd and Fe, respectively. Most importantly, the results show that Ce, Co co-doped compounds are excellent replacements for several Dy-based high performance permanent magnets (dysprosium is one of the critical elements and is, therefore, in short supply). As a result, the high temperature (>375 K) magnetic properties for Nd–Ce–Fe–Co–B based alloys show promise not only as a replacement for Dy-doped Nd2Fe14B permanent magnets, but the new alloys also require significantly lower amounts of Nd, which too is the critical element that can be replaced by a more abundant Ce.

  6. The Environmental Protection Agency's Safety Standards for Disposal of Spent Nuclear Fuel: Potential Path Forward in Response to the Report of the Blue Ribbon Commission on America's Nuclear Future - 13388

    SciTech Connect (OSTI)

    Forinash, Betsy; Schultheisz, Daniel; Peake, Tom

    2013-07-01

    Following the decision to withdraw the Yucca Mountain license application, the Department of Energy created a Blue Ribbon Commission (BRC) on America's Nuclear Future, tasked with recommending a national strategy to manage the back end of the nuclear fuel cycle. The BRC issued its final report in January 2012, with recommendations covering transportation, storage and disposal of spent nuclear fuel (SNF); potential reprocessing; and supporting institutional measures. The BRC recommendations on disposal of SNF and high-level waste (HLW) are relevant to the U.S. Environmental Protection Agency (EPA), which shares regulatory responsibility with the Nuclear Regulatory Commission (NRC): EPA issues 'generally applicable' performance standards for disposal repositories, which are then implemented in licensing. For disposal, the BRC endorses developing one or more geological repositories, with siting based on an approach that is adaptive, staged and consent-based. The BRC recommends that EPA and NRC work cooperatively to issue generic disposal standards-applying equally to all sites-early in any siting process. EPA previously issued generic disposal standards that apply to all sites other than Yucca Mountain. However, the BRC concluded that the existing regulations should be revisited and revised. The BRC proposes a number of general principles to guide the development of future regulations. EPA continues to review the BRC report and to assess the implications for Agency action, including potential regulatory issues and considerations if EPA develops new or revised generic disposal standards. This review also involves preparatory activities to define potential process and public engagement approaches. (authors)

  7. S. 42: A Bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil and refined petroleum products. Introduced in the Senate of the United States, One Hundredth First Congress, First Session, January 25, 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    S. 42 is a bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil and refined petroleum products.

  8. Blue Ribbon Commission (BRC) Activities - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Here is a link to comments made by J. David Jameson representing the SRSCRO at the BRC Public Hearing in Atlanta, GA, October 18, 2011. Below are public comments presented by J. ...

  9. Accelerating Fatigue Testing for Cu Ribbon Interconnects

    Broader source: Energy.gov [DOE]

    Presented at the 2013 Photovoltaic Module Reliability Workshop; 26-27 February 2013; Denver, Colorado

  10. Blue Ribbon Panel Recommendations Report Now Available

    Broader source: Energy.gov [DOE]

    On March 22 and 23, 2011, the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy assembled a panel of geothermal experts in Albuquerque, New Mexico for a guided discussion on the future of geothermal energy in the U.S.

  11. Defect-Tolerant Diffusion Channels for Mg2+ Ions in Ribbon-Type Borates: Structural Insights into Potential Battery Cathodes MgVBO4 and Mgx Fe2–xB2O5

    SciTech Connect (OSTI)

    Bo, Shou-Hang; Grey, Clare P.; Khalifah, Peter G.

    2015-06-10

    The reversible room temperature intercalation of Mg2+ ions is difficult to achieve, but may offer substantial advantages in the design of next-generation batteries if this electrochemical process can be successfully realized. Two types of quadruple ribbon-type transition metal borates (MgxFe2-xB2O5 and MgVBO4) with high theoretical capacities (186 mAh/g and 360 mAh/g) have been synthesized and structurally characterized through the combined Rietveld refinement of synchrotron and time-of-flight neutron diffraction data. Neither MgVBO4 nor MgxFe2-xB2O5 can be chemically oxidized at room temperature, though Mg can be dynamically removed from the latter phase at elevated temperatures (approximately 200 - 500 °C). Findings show that Mg diffusion in the MgxFe2-xB2O5 structure is more facile for the inner two octahedral sites than for the two outer octahedral sites in the ribbons, a result supported by both the refined site occupancies after Mg removal and by bond valence sum difference map calculations of diffusion paths in the pristine material. Mg diffusion in this pyroborate MgxFe2-xB2O5 framework is also found to be tolerant to the presence of Mg/Fe disorder since Mg ions can diffuse through interstitial channels which bypass Fe-containing sites.

  12. Sweet Lake Geopressured-geothermal Project, Magma Gulf-Technadril/DOE Amoco Fee. Volume II. Surface installations reservoir testing. Annual report, February 28, 1981-February 10, 1982

    SciTech Connect (OSTI)

    Hoffman, K.S.

    1984-01-01

    The Magma Gulf-Technadril/Department of Energy Amoco Fee No. 1 (production) and salt water disposal wells were drilled in the period from August, 1980 to February 1981. Surface facilities were designed and constructed during March-June 1981. Flow testing began in June 1981 and continued until February, 1982. The Miogypsinoides interval contains seven discrete sands in the test well. These sands have been numbered 1 to 7, beginning at the top of the sequence. Data from wireline logs and core samples suggested that the first zone to be perforated should be Sand 5. Because of its high porosity and permeability, Sand 5 was thought to contain almost 50% of the total hydraulic capacity of the well. Flow testing of Sand 5 was performed in three stages, each of which is fully described in this report. Phase I was designed as an initial clean-up flow and a reservoir confirmation test. Phase II consisted of the reservoir limit determination test and lasted 17 days. Boundaries were confirmed which suggest that the Sweet Lake reservoir is fairly narrow, with boundaries on three sides, but is open in one direction with no closure for at least 4-1/4 miles. These boundaries approximate the shape of the graben in which the test well was drilled, but may or may not be directly related to the major faults forming the graben. Phase III testing was planned to be a long-term test at commercial design rates. Although Sand 5 alone would not support such rates, long-term production was demonstrated. Additional research not supported by DOE funding was also performed during the period covered by this report. This research, consisting of mud logging, micropaleontology, organic geochemistry, core analysis, and rock mechanics, is summarized in this report.

  13. H. R. 4662: a bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil and refined petroleum products. Introduced in the House of Representatives, Ninety-Ninth Congress, Second Session, April 22, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    A bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil and refined petroleum products was introduced and referred to the House Ways and Means Committee. The fee would apply to the first sale of crude or refined petroleum products following importation into the US and the first use. It exempts certain exports, but requires proof of eligibility for exemption. Sections of the bill outline procedures for determining prices and adjustments, the registration of affected parties, and penalties for non-compliance.

  14. Extended write combining using a write continuation hint flag

    DOE Patents [OSTI]

    Chen, Dong; Gara, Alan; Heidelberger, Philip; Ohmacht, Martin; Vranas, Pavlos

    2013-06-04

    A computing apparatus for reducing the amount of processing in a network computing system which includes a network system device of a receiving node for receiving electronic messages comprising data. The electronic messages are transmitted from a sending node. The network system device determines when more data of a specific electronic message is being transmitted. A memory device stores the electronic message data and communicating with the network system device. A memory subsystem communicates with the memory device. The memory subsystem stores a portion of the electronic message when more data of the specific message will be received, and the buffer combines the portion with later received data and moves the data to the memory device for accessible storage.

  15. 48 Star American Flag from Y-12 Plant in 1943

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of the world. From the Manhattan Project to the Cold War to now waging the War on Terror, Y-12 has served a central role in supplying critical components for our nuclear...

  16. Last Flag of the 2015 Green Racing Season

    Broader source: Energy.gov [DOE]

    The Petit Le Mans, a 10-hour endurance racecar competition held annually at the beginning of October, is known for being difficult, long, and (since 2006) “green.” Supported by the U.S. Department of Energy, U.S. Environmental Protection Agency, and SAE International, Green Racing recognizes racecar teams that go the farthest and fastest with the smallest environmental footprint.

  17. Ejecta source and transport modeling in the FLAG hydrocode (Conference...

    Office of Scientific and Technical Information (OSTI)

    Authors: Fung, Jimmy 1 ; Harrison, Alan K 1 ; Margulies, Jeremy 1 ; Chitanvis, Shirish 1 + Show Author Affiliations Los Alamos National Laboratory Publication Date: ...

  18. Progress in ejecta modeling in the FLAG code (u) (Conference...

    Office of Scientific and Technical Information (OSTI)

    A paper copy of this document is also available for sale to the public from the National Technical Information Service, Springfield, VA at www.ntis.gov. Authors: Harrison, Alan K ...

  19. S. 2886: a bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil or refined petroleum products. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, September 27, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    This bill amends Subtitle E of the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil or refined petroleum products. The bill inserts Chapter 54, which defines the rate of tax, procedures for its payment and for registration, and imposes penalties for non-compliance.

  20. S. 2779: a bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil and refined petroleum products to protect the national and energy security interests of the United States. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, August 15, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    The Energy Security Act of 1986 amends the Internal Revenue Code of 1954 to impose a fee on petroleum and petroleum product imports. The purpose is to protect the US national and energy security interests. The general tax rate shall be $4 per barrel, with a formula for reduction when the price is $18 or more. Exemptions include petroleum intended for export.

  1. QER- Comment of Christopher Fee

    Broader source: Energy.gov [DOE]

    Until you stop subsidizing and worshipping at the altar of Big Energy, all this "We the people" crapola is just that. We no longer have. Democracy, Mr. Reed, because our government is owned by heartless men with big pockets. Sent from my iPhone. La dee freakin' da.

  2. SR-01-04

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 29, 2004 Media Contact: Bill Taylor (803) 952-7697 SRS to Host "Carolina Challenge" Security Police Competition Flag Ribbon Art Aiken, SC -- The U.S. Department of Energy (DOE) and Wackenhut Services Incorporated (WSI) will host the 32nd Annual Security Police Officer Training Competition (SPOTC) "Carolina Challenge," May 2 - 6, at the Savannah River Site (SRS) Advanced Tactical Training Academy (ATTA). SPOTC is a tactically oriented security firearms competition

  3. SR-02-02

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2002 Media Contact: Jim Giusti (803) 725-2889 NNSA Release Accident Investigation Report On TEF Construction Worker Accident Flag Ribbon Art Aiken, SC - The National Nuclear Security Administration's (NNSA) Savannah River Site Office (SRSO) today issued its Accident Investigation Board's findings on the cause of an accident at the Tritium Extraction Facility (TEF) construction site in which one worker was injured. On April 2, 2002, at the Savannah River Site, a carpenter helping to erect

  4. SR-04-04

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 2004 Media Contact: Jim Giusti (803) 952-7697 Media Advisory: Tritium Celebration Flag Ribbon Art Note to News Directors and Editors: AIKEN, S.C. (June 25, 2004)-The National Nuclear Security Administration (NNSA) Savannah River Site Office and Westinghouse Savannah River Company will host a recognition ceremony at 11:30 on Thursday, July 1, for approximately 700 craft and other personnel working on the site's two large Defense Programs project: the Tritium Extraction Facility (TEF) and the

  5. SR-05-04

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Media Contact: Jim Giusti (803) 952-7697 NNSA And WSRC Reconition Of Progress In Key Tritium Facilities Flag Ribbon Art (Aiken, SC) -- Personnel from the National Nuclear Security Administration (NNSA) Savannah River Site Office (SRSO) joined with the Westinghouse Savannah River Company team on Thursday, July 1, to recognize the hundreds of craft personnel and other employees who have contributed to the exceptional progress on two key tritium projects. The Tritium Extraction Facility (TEF) and

  6. SR-06-04

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2004 Media Contact: Jim Giusti (803) 952-7697 Media Advisory: Historic Preservation Signing Ceremony Flag Ribbon Art Note To News Directors & Editors On July 8, 2004, at 3:30 p.m., the Savannah River Operations Office will host a ceremonial signing of a programmatic agreement between the U. S. Department of Energy (DOE), National Nuclear Security Administration, the South Carolina State Historic Preservation Office, and the Advisory Council on Historic Preservation (ACHP) for the

  7. SR0001

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Immediate Release January 12, 2000 Media Contact: Bill Taylor (803) 725-2889 Nuclear Security Oversight Panel Visits SRS As Part Of NSSA Tour Flag Ribbon Art Representatives from the Special Oversight Panel on Department of Energy Reorganization will be visiting the Savannah River Site (SRS) on Thursday, January 13, 2000. The Panel is touring Department of Energy facilities that will become part of the National Nuclear Security Administration (NNSA). Members of the Panel will provide

  8. SR0002

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2000 Media Contact: Bill Taylor (803) 725-2889 General Eugene Habiger, DOE Security Czar To Visit SRS Flag Ribbon Art General Eugene Habiger (USAF Retired), the Department of Energy's Security Czar and Director of Security and Emergency Response, will visit the Savannah River Site (SRS) on Wednesday, February 2, 2000. Following his visit to SRS facilities and a first-hand look at security functions, Gen. Habiger will meet with media representatives. General Habiger will be available for

  9. SR0004

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 1999 Media Contact: James R. Giusti (803) 725-2889 DOE Releases Accident Investigation Report On FB-Line Workers' Plutonium Intake Flag Ribbon Art Aiken, SC - The Department of Energy's Savannah River Operations Office (SR) today issued its Accident Investigation Board's findings on the cause of plutonium intakes by seven Savannah River Site (SRS) employees in the FB-Line facility. On September 1, 1999, plutonium was released from a failed plutonium storage canister at the Site's FB-Line

  10. SR0007

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Cleanup Technology Conference To Be Held Flag Ribbon Art The Savannah River Operations Office of the Department of Energy is hosting the Environmental Restoration Technology End User Conference on June 6-8 at the Sheraton Augusta Hotel, in Augusta, Georgia. The principal purposes of the conference are to share cleanup successes and innovations from the two co-sponsoring federal agencies-the Department of Defense and the Environmental Protection Agency-and DOE sites; promote the

  11. SR0010

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2000 Media Contact: Jim Giusti (803) 725-2889 DOE Hosts Radioactive Materials Transportation Workshop Flag Ribbon Art Note To Editors And News Directors: Aiken, SC - The Department of Energy will host an informational transportation workshop tomorrow and Friday (June 22-23) in Augusta, GA. The workshop is part of an ongoing series to involve state and local officials, and is designed to help share information about DOE transportation of radioactive materials. The theme of this particular

  12. SR0011

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    26, 2000 Media Contact: Rick Ford (803) 725-2889 Energy Secretary Bill Richardson to Visit Savannah River Site Groundbreaking for Tritium Facility, 50th Anniversary on Agenda Flag Ribbon Art Media Advisory Secretary of Energy Bill Richardson will be at the Savannah River Site and Fort Discovery on Thursday, July 27, to break ground for the new $400 million Tritium Extraction Facility and celebrate the 50th Anniversary of the Savannah River Site. Secretary Richardson will be joined by Gen. John

  13. SR0013

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    25, 2000 Media Contact: Rick Ford (803) 725-2889 Savannah River Operations Office Wins Best Practices Award Flag Ribbon Graphic The Department of Energy's Savannah River Operations Office (SR) has received the FY2000 "Human Resources/Equal Employment Opportunity Best Practices" Award from the Federal Personnel Management Institute (FPMI). The award is presented annually by FPMI to a single Federal organization that has "demonstrated outstanding innovation and creativity in

  14. SR0016

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 2000 Media Contact: Bill Taylor (803) 725-2889 DOE Meeting To Focus On New Compensation Program For Work-Related Illness Effecting SRS Employees Flag Ribbon Graphic Aiken, SC - The Department of Energy's (DOE) Assistant Secretary for Environment, Safety and Health, Dr. David Michaels, will hold a public meeting to discuss the new Federal compensation program for DOE contract employees such as Savannah River Site workers who have work related illnesses. The meeting will be held Thursday,

  15. SR0017

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bill Taylor (803) 725-2889 Media Availability For Dr. David Michaels, Assistant Secretary for Environment, Safety and Health Flag Ribbon Graphic Note to Editors and News Directors MEDIA AVAILABILITY 6:15 p.m. Thursday, December 7 Aiken Technical College's Continuing Education Confernce Center, Room 733 PRIOR TO: DOE Meeting to Focus on New Compensation Program for Work-Related Illness Effecting SRS Employees The Department of Energy's (DOE) Assistant Secretary for Environment, Safety and Health,

  16. SR0102

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    30, 2001 Media Contact: Julie Petersen (803) 725-2889 DOE Annouces Availability of Draf SEIS On Salt PRocessing Alternatives Flag Ribbon Art Aiken, SC -- Today the Department of Energy (DOE) Savannah River Operations Office (SR) announces the availability of a Draft Supplemental Environmental Impact Statement (EIS) which evaluates alternatives for separating the high-activity and low-activity salt waste from the liquid high-level radioactive waste now stored in underground tanks at the Savannah

  17. SR0105

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2001 Media Contact: Julie Petersen (803) 725-2889 Doe Announces Availability Of Draft RFP On Salt Waste Processing Facility Flag Ribbon Art Aiken, SC; May 24, 2001 -- Today the Department of Energy (DOE) Savannah River Operations Office (SR) announced in the Commerce Business Daily the availability of the Draft Request for Proposals (RFP) for the acquisition of services to design, construct, and commission a facility to process the salt fraction of high-level radioactive waste currently

  18. SR0108

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, 2001 Media Contact: Jim Giusti (803) 725-2889 DOE Announces Plans For Offsite Treatment & Disposal of SRS Waste Flag Ribbon Art Aiken, SC -- The Department of Energy (DOE) has published an Amended Record of Decision (ROD) to the Savannah River Site (SRS) Waste Management Environmental Impact Statement (DOE/EIS-0217). This ROD modifies earlier decisions concerning the treatment and disposal of low-level radioactive waste (LLW) and mixed hazardous and low-level radioactive waste (MLLW) at

  19. SR0109

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0, 2001 Media Contact: Julie Petersen (803) 725-2889 DOE ANNOUNCES AVAILABILITY OF FINAL SUPPLEMENTAL EIS AND IDENTIFIES PREFERRED SALT PROCESSING ALTERNATIVE Flag Ribbon Art AIKEN, SC; July 20 -Today the Department of Energy (DOE) Savannah River Operations Office (SR) announced the availability of the Savannah River Site Salt Processing Alternatives Final Supplemental Environmental Impact Statement (EIS). Based on DOE's evaluation of research results and comments received on the Draft

  20. SR0110

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2001 Media Contact: Bill Taylor (803) 725-2889 Energy Employees Compensation Center To Open In North Augusta, SC Flag Ribbon Art Aiken SC (July 24) -- A resource center where nuclear weapons workers can go for help to file claims for compensation under the Energy Employees Occupational Illness Compensation Program Act will begin operations with an opening ceremony at 11 a.m., Friday, July 27. The Energy Employees Compensation Center at 1708 Bunting Drive, North Augusta, SC, is sponsored

  1. SR0112

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Release Logo For Immediate Release October 18, 2001 Media Contact: Julie Petersen (803) 725-2889 DOE ANNOUNCES RECORD OF DECISION ON SRS SALT WASTE PROCESSING ALTERNATIVES Flag Ribbon Art AIKEN, SC -- The U.S. Department of Energy (DOE) announced that it has selected Caustic Side Solvent Extraction as the Savannah River Site (SRS) Salt Processing preferred alternative for treating salt-bearing high-level radioactive waste. The Department's decision is outlined in a Record of Decision (ROD)

  2. SR0113?

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 5, 2001 Media Contact: Bill Taylor (803) 725-2889 DOE Announces Availability Of Final RFP For SRS Salt Processing Facility Flag Ribbon Art Aiken, SC -- Today the Department of Energy (DOE) made available the Final Request for Proposals (RFP) for the acquisition of services to design, construct, and commission a facility to process the salt portion of high-level radioactive waste currently stored in underground tanks at the Savannah River Site (SRS). The Salt Waste Processing Facility

  3. SR0203

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    31, 2002 Media Contact: Julie Petersen (803) 725-2889 DOE Announces Availability Of Final EIS On SRS High-Level Waste Tank Closures Flag Ribbon Art AIKEN, SC; May 31 - The Department of Energy (DOE) Savannah River Site (SRS) announced today the availability of the Final Environmental Impact Statement (EIS) on the proposed closing of additional high-level waste (HLW) tanks at SRS. The EIS evaluated three alternatives regarding closure of the HLW tanks: (1) Stabilize Tanks; (2) Clean and Remove

  4. SR0204

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Media Contact: Julie Petersen (803) 725-2889 Allison Named DOE-SR Acting Manager Flag Ribbon Art AIKEN, SC; July 1 - Assistant Secretary for Environmental Management Jessie H. Roberson recently announced the designation of Jeffrey M. Allison as Acting Manager for the Department of Energy (DOE) Savannah River Operations Office (SR). Mr. Allison is a career member of the Senior Executive Service with over 19 years of experience in engineering, safety, health, process development, and management

  5. SR0206

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    17, 2002 Media Contact: Julie Petersen (803) 725-2889 DOE Announces Conceptual Design Contracts For SRS Salt Waste Processing Facility Flag Ribbon Art Aiken, SC - Today the Department of Energy (DOE) took the first step in commissioning a Salt Waste Processing Facility (SWPF) at the Savannah River Site (SRS) by awarding two contracts for the facility's conceptual design. The SWPF is intended to process the high-level radioactive waste salt solutions currently stored in underground tanks at SRS.

  6. SR0301

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 31, 2003 Media Contact: Bill Taylor (803) 725-2889 Helicopters to Conduct Equipment Tests Over Savannah River Site During February Flag Ribbon Art U.S. Government helicopters will be visible over the Savannah River Site February 3 - 14. The helicopters, UH-60 "Blackhawks," will be testing radiological monitoring equipment for use by various federal agencies. The tests will be conducted by placing radiological source materials in selected area throughout the Department of

  7. SR0303

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, 2003 Media Contact: Julie Petersen (803) 725-2889 Environmental Conference To Showcase Cleanup Technologies Flag Ribbon Art AIKEN, S.C., June 2 -- Approximately 200 professionals from across the United States and Canada will meet in Columbia, South Carolina, June 3-5 to share information on innovative and cost-effective environmental cleanup techniques. The conference-the Environmental Restoration Technology End Users Conference will be at the Sheraton Columbia Convention Center. It is

  8. SR0304

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2003 Media Contact: Jim Giusti (803) 725-2889 NNSA Official Recognize Rapid Completion Of Key Tritium Processing Components Flag Ribbon Art AIKEN, S.C. (June 12)- Dr. Everet Beckner, Deputy Administrator for Defense Programs, of the National Nuclear Security Administration congratulated more than 200 craftsmen and other personnel who fabricated and installed the internals of the first two "gloveboxes" of the Site's new Tritium Extraction Facility, or TEF. This important work was

  9. SR0305

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, 2003 Media Contact: Jim Giusti (803) 725-2889 DOE Hosts Public Workshops on Historical Preservation of SRS' Cold War Resources Flag Ribbon Art Aiken, SC - The Department of Energy's Savannah River Operations Office (DOE-SR) will host this month two public information workshops & seek public comments on the preservation of historical "Cold War" resources at SRS. As part of its compliance with the National Historic Preservation Act (NHPA) of 1966 (as amended), the Department will

  10. SR0501

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    14, 2005 Media Contact: James Giusti (803) 952-7697 End State Vision at Savannah River Site Made Public Flag Ribbon Art Aiken, S.C. - The Department of Energy's Savannah River Operations Office issued the draft Savannah River Site (SRS) End State Vision Document for review and comment on Wednesday (March 9, 2005). The SRS End State Vision Document is a concise guide to current conditions at SRS and the conditions the Department plans to achieve through the Site's Environmental Management (EM)

  11. SR0505

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2005 Media Contact: James Giusti (803) 952-7697 Subcontract Awarded for MOX Facility Site Preparation Work Flag Ribbon Art Aiken, S.C. - The National Nuclear Security Administration's (NNSA) plutonium disposition program has moved another step forward with the start of site preparation for its Mixed Oxide (MOX) Fuel Fabrication Facility at the Savannah River Site. NNSA announced today that the first subcontract for this work has been awarded to MDM Services Corporation, a small business

  12. SR9807

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 1999 Media Contact: Bill Taylor (803) 725-2889 DOE Teams with State on Dedication and Management of 10,000 Acre Crackerneck Wildlife Management Area and Ecological Reserve Flag Ribbon Art Aiken, S.C. (June 24) -- Secretary of Energy Bill Richardson today designated 10,000 acres of the Savannah River Site (SRS) as a biological and wildlife refuge creating the Crackerneck Wildlife Management Area and Ecological Reserve. The agreement, co-signed by South Carolina Department of Natural Resources

  13. SR9901

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 1999 Media Contact: Bill Taylor (803) 725-2889 DOE Renews SRS Security Contract With Wackenhut Services Inc. Flag Ribbon Art Aiken, SC - The Department of Energy (DOE) has renewed the Savannah River Site (SRS) security contract with Wackenhut Services Inc., a five-year contract valued at $300 million. Wackenhut Services Inc. (WSI) has provided security and protective services at SRS, a 310-square mile DOE facility, since 1983. Security services for SRS include: An armed paramilitary

  14. SR9903

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    22, 1999 Media Contact: Julie Petersen (803) 725-2889 DOE-SR To Prepare Supplemental Environmental Impact Statement On High-Level Waste System Alternatives Flag Ribbon Art AIKEN, SC; February 22 -Today the Department of Energy (DOE) Savannah River Operations Office (SR) issued a Notice of Intent to prepare a Supplemental Environmental Impact Statement (SEIS) on the proposed replacement of the existing In-Tank Precipitation (ITP) process at the Savannah River Site (SRS). Replacement of the

  15. SR9904

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 26, 1999 Media Contact: Bill Taylor (803) 725-2889 World's First Underground Waste Repository Begins Operations First Shipment of Transuranic Radioactive Waste Arrives at WIPP Flag Ribbon Art CARLSBAD, N.M. (March 26,1999) -- Energy Secretary Bill Richardson today announced that the first shipment of defense-generated transuranic radioactive waste arrived safely at the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). Hundreds of people were on hand to watch this

  16. SR9908

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9, 1999 Media Contact: Rick Ford (803) 725-2889 Notice To News Editors and News Directors Flag Ribbon Art WHO: On July 13, Dr. David Michaels, Assistant Secretary for Environment, Safety and Health for the Department of Energy (DOE), will present awards to two Savannah River Site (SRS) contractors, Wackenhut Services, Inc. (WSI) and Westinghouse Savannah River Company (WSRC) for significant achievements in DOE's Voluntary Protection Program (VPP). The Department initiated its VPP in January 1994

  17. SR9909

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    13, 1999 Media Contact: Julie Petersen (803) 725-2889 DOE Awards SRS Contractors For Outstanding Safety & Health Programs Flag Ribbon Art Aiken, S.C. - In separate ceremonies at the Savannah River Site (SRS) today, U.S. Department of Energy (DOE) Deputy Assistant Secretary for Worker Health and Safety, Joe Fitzgerald, presented awards to SRS contractors, Wackenhut Services, Inc. (WSI) and Westinghouse Savannah River Company (WSRC), for significant achievements in DOE's Voluntary Protection

  18. SR9911

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 1999 Media Contact: Rick Ford (803) 725-2889 Note To Editors and News Directors Flag Ribbon Art The following is a statement by Greg Rudy, Manager of the Savannah River Operations Office, on the election of Ambrose Schwallie to the position of Executive Vice President of Morrison Knudsen Corporation and his promotion to President and Chief Executive Officer of the Westinghouse Government Services Group. "Ambrose successfully led the Site through some of its most challenging and uncertain

  19. SR9913

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10, 1999 Media Contact: Jim Giusti (803) 725-2889 DOE Initiates Investigation Into FB Line Worker Contamination Flag Ribbon Art Aiken, SC - The Department of Energy's Savannah River Operations Office has initiated action to establish a Type-B Investigation Board as a result of a preliminary dose estimate for the one of the seven SRS workers contaminated in routine operations in FB Line on September 1, 1999. The preliminary dose estimate exceed established federal exposure limits and exceeds

  20. Task Force for Strategic Developments to Blue Ribbon Commission...

    Office of Environmental Management (EM)

    Planning Project Overview Used Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan...

  1. Secretary Chu Announces Blue Ribbon Commission on America's Nuclear Future

    Broader source: Energy.gov [DOE]

    The Commission, led by Lee Hamilton and Brent Scowcroft, will provide recommendations on managing used fuel and nuclear waste

  2. Blue Ribbon Commission on America's Nuclear Future Report to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    It was cochaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other Commissioners were Mr. Mark H. Ayers, the Hon. Vicky A. Bailey, Dr. Albert Carnesale, Sen. Pete Domenici, ...

  3. Sandia Energy - Louisiana Blue Ribbon Commission on Bayou Corne...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the sinkhole. (Photo courtesy of Louisiana Department of Natural Resources) Secretary Stephen Chustz, from the Louisiana Department of Natural Resources (LADNR), asked David Borns...

  4. Secretary of Energy Moniz Cuts Ribbon, Kicks Off Solar Decathlon...

    Office of Environmental Management (EM)

    are able to tour the houses, gather ideas to use in their own homes, and learn how energy-saving features can help them save money today. The overall winner will be...

  5. Amyloid-like ribbons of amelogenins in enamel mineralization

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Carneiro, Karina M. M.; Zhai, Halei; Zhu, Li; Horst, Jeremy A.; Sitlin, Melody; Nguyen, Mychi; Wagner, Martin; Simpliciano, Cheryl; Milder, Melissa; Chen, Chun-Long; et al

    2016-03-24

    We report that enamel, the outermost layer of teeth, is an acellular mineralized tissue that cannot regenerate; the mature tissue is composed of high aspect ratio apatite nanocrystals organized into rods and inter-rod regions. Amelogenin constitutes 90% of the protein matrix in developing enamel and plays a central role in guiding the hierarchical organization of apatite crystals observed in mature enamel. To date, a convincing link between amelogenin supramolecular structures and mature enamel has yet to be described, in part because the protein matrix is degraded during tissue maturation. Here we show compelling evidence that amelogenin self-assembles into an amyloid-likemore » structure in vitro and in vivo. We show that enamel matrices stain positive for amyloids and we identify a specific region within amelogenin that self-assembles into β-sheets. Lastly, we propose that amelogenin nanoribbons template the growth of apatite mineral in human enamel. This is a paradigm shift from the current model of enamel development.« less

  6. ADVISORY: Blue Ribbon Commission on America's Nuclear Future...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Energy will be able to support between six and nine new reactors. What does all of this mean for the country? This investment will provide enough clean energy to power more than...

  7. Task Force for Strategic Developments to Blue Ribbon Commission Recommendations

    Office of Environmental Management (EM)

    Big Data Together Tackling Big Data Together February 21, 2013 - 5:43pm Addthis PNNL's Olympus supercomputer is one of the computational resources that will be used by members of the Northwest Institute for Advanced Computing. Other resources include the University of Washington's Hyak supercomputer and cloud computing. PNNL's Olympus supercomputer is one of the computational resources that will be used by members of the Northwest Institute for Advanced Computing. Other resources include the

  8. Under Secretary Klotz delivers remarks at PREP ribbon-cutting...

    National Nuclear Security Administration (NNSA)

    PREP establishes the largest federally-owned wind farm in the country and will generate ... Who's on FIRST? Inspiring STEM through robotics Wind farm generating more renewable energy ...

  9. SYMMETRY OF THE IBEX RIBBON OF ENHANCED ENERGETIC NEUTRAL ATOM...

    Office of Scientific and Technical Information (OSTI)

    English Subject: 79 ASTROPHYSICS, COSMOLOGY AND ASTRONOMY; ASYMMETRY; ATOMS; DETECTION; ENERGY DEPENDENCE; HELIOSPHERE; INTERSTELLAR SPACE; KEV RANGE; MAGNETIC FIELDS; PLASMA;...

  10. S. 65: A Bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil and refined petroleum products. Introduced in the Senate of the United States, One Hundred Third Congress, First Session, January 21, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    S. 65 may be cited as the [open quotes]Domestic Petroleum Security Act of 1993.[close quotes] This Bill proposes a fee on imported crude oil or refined petroleum products. In general, Subtitle E of the Internal Revenue Code of 1986 is to be amended by adding at the end thereof the following new chapter: [open quotes]Chapter 55--Imported Crude Oil of Refined Petroleum Products.[close quotes] Section 5891 will be Imposition of Tax; Section 5892, Definitions; Section 5893, Registration; and Section 5894, Procedures, Returns, and Penalties.

  11. H. R. 838: A Bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil or refined petroleum products. Introduced in the House of Representatives, One Hundred Third Congress, First Session, February 4, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    H.R. 838 may be cited as the [open quotes]Energy Security Tax Act.[close quotes] The purpose of this Bill is to impose a fee on imported crude oil or refined petroleum products. In general, Subtitle E of the Internal Revenue Code of 1986 is to be amended by adding at the end thereof the following new chapter: [open quotes]Chapter 55--Imported Crude Oil, Refined Petroleum Products, and Petrochemical Feedstocks or Derivatives.[close quotes] Section 5886 will be concerned with Imposition of Tax; Section 5887 with Definitions; Section 5888 with Procedures, Returns, and Penalties; and Section 5890 with Adjustment for inflation.

  12. Logistics & Fees - Combustion Energy Frontier Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are available to all participants. Participants may also choose to make arrangements to stay and dine at area hotels and restaurants. (1) Summer school dormitory facilities have...

  13. City of Asheville- Building Permit Fee Rebates

    Broader source: Energy.gov [DOE]

    The City of Asheville offers rebates for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings....

  14. Federal Court Dismisses Waste Fee Challenges

    Broader source: Energy.gov [DOE]

    The D.C. Circuit today dismissed petitions filed by the National Association of Regulatory Utility Commissioners (NARUC) and other entities seeking (1) to force the Department to issue an...

  15. UCOR Contract & Fee Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating...

  16. WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE

    Energy Savers [EERE]

    Laboratory in Golden, Colorado | Department of Energy News Media Contact (202) 586-4940 WASHINGTON - Building on President Obama's Climate Action Plan and the Administration's commitment to steady, responsible steps that reduce carbon pollution and support an all-of-the-above energy strategy, Energy Secretary Ernest Moniz will dedicate a new clean energy research facility and supercomputer at the National Renewable Energy Laboratory (NREL) in Golden, Colorado. Secretary Moniz will also

  17. FY2015AwardFeeApproved.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  18. SR0003

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2000 Media Contact: Bill Taylor (803) 725-2889 DOE To Present Savannah River Site's Upcoming Fiscal Year 2001 Budget Flag Ribbon Art Aiken, SC -- The public is invited to view the Department of Energy's (DOE) Fiscal Year 2001 budget presentation that will be provided via satellite downlink starting at 1:30 p.m., Monday, February 7, 2000, at Aiken Technical College's Learning Resource Center amphitheater. The annual DOE budget roll out will feature an introduction by Secretary of Energy Bill

  19. SR0012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 31, 2000 Media Contact: Rick Ford (803) 725-2889 "Melt And Dilute" Selected To Treat DOE's Spent Nuclear Fuel At Savannah River Flag Ribbon Art Technology Supports Administration's Non-Proliferation Commitments The Department of Energy has selected a new technology to manage the majority of spent fuel being received at the Department of Energy's (DOE) Savannah River Site (SRS), near Aiken, S.C. "I've given the green light to the SRS workforce to put the melt and dilute

  20. SR0014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 30, 2000 Media Contact: Jim Giusti (803) 725-2889 Draft EIS Issued On Future Closures Of SRS High-Level Waste Tanks Flag Ribbon Graphic AIKEN, SC; November 30 - The Department of Energy (DOE) Savannah River Operations Office (SR) has published for public review and comment the Draft Environmental Impact Statement (EIS) on the proposed closing of additional high-level waste (HLW) tanks at the Savannah River Site (SRS). DOE-SR proposes to close the tank systems to protect human health and

  1. SR0101

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, 2001 Media Contact: Bill Taylor (803) 725-2889 Savannah River Site's Martin Luther King, Jr., Day Observance Flag Ribbon Art Media organizations are invited to attend and cover the Savannah River Site's observation of Martin Luther King Jr. Day on Wednesday, January 10, 2001. The observance will be held in the Main Administration Area's cafeteria, starting at 2 p.m. The site-wide observance will feature Mr. Marshall Smith of Orangeburg, S.C., noted for his renditions of Dr. King's speeches.

  2. SR0103

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2001 Media Contact: James Giusti (803) 725-2889 Note to Editors and News Directors Flag Ribbon Art On May 8, media representatives are invited to observe the first shipment of transuranic, or TRU, waste leave the Savannah Rive Site (SRS) for the Waste Isolation Plant (WIPP), located in Carlsbad, NM. A truck, loaded with the TRUPACT-II shipping containers, will pass through the Site’s Jackson Barricade (Barricade #1) en route to I-20 at about 12:15 p.m. Media representatives planning to view

  3. SR0104

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, 2001 Media Contact: James Giusti (803) 725-2889 Savannah River Site Sends First Shipment of Transuranic Waste to WIPP Flag Ribbon Art AIKEN, S.C., May 8 – The first shipment of transuranic, or TRU, waste from the Savannah River Site (SRS) to the Waste Isolation Pilot Plant (WIPP), located in Carlsbad, New Mexico, left the Site shortly after noon today. This shipment, which consists of 42 drums of transuranic waste, is the first of at least four SRS shipments to WIPP planned for fiscal year

  4. SR0107

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2001 Media Contact: Bill Taylor (803) 725-2889 DOE & DOL Hold Public Meetings For Energy Employees Occupational Illness Compensation Program At Flag Ribbon Art Aiken SC (June 14, 2001) - The U.S. Departments of Labor and Energy will hold two public meetings at 1 p.m. and 7 p.m., Tuesday, June 19 at the North Augusta Community Center, North Augusta, SC, for employees and families who may be eligible for compensation under the Energy Employees Occupational Illness Compensation Program Act.

  5. SR0201

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 5, 2001 Media Contact: Bill Taylor (803) 725-2889 SRS Environmental Management FY2003 Budget and Top-To-Bottom Review Presented At Friday Meeting Flag Ribbon Art The public is invited to a presentation and discussion of the Department of Energy's recent Top-To-Bottom Review of the Environmental Management (EM) program and the Savannah River Site Fiscal Year (FY) 2003 EM budget request. WHO: Senior Savannah River Site Officials WHEN: Friday, February 8, 2002 2 - 3 p.m. WHERE: Aiken

  6. SR0205

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19, 2002 Media Contact: Julie Petersen (803) 725-2889 DOE Announces Record Of Decision On SRS High-Level Waste Tank Closure Flag Ribbon Art AIKEN, SC -- The U.S. Department of Energy (DOE) announced that it has selected the Stabilize Tanks and Fill with Grout preferred alternative for additional closures of high-level waste tanks at the Savannah River Site (SRS). The Department's decision is outlined in a Record of Decision (ROD) published in today's Federal Register. An Environmental Impact

  7. SR0207

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    30, 2002 Media Contact: Julie Petersen (803) 725-2889 Notice To Editors: DOE Releases SRS History Book Flag Ribbon Art WHO: U.S. Department of Energy (DOE) Savannah River Operations Office (SR) Acting Manager Jeffrey Allison will publicly release the recently published technical history of the Savannah River Site (SRS), SRS at Fifty. WHAT: Brief event involving local students and DOE-SR Acting Manager. WHEN: Wednesday, October 2, 2002, at 2:00 PM. WHERE: New Ellenton Middle School; SC Highway

  8. SR0209

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2002 Media Contact: Bill Taylor (803) 725-2889 DOE/NNSA to Host Modern Pit Facility Media Availability Flag Ribbon Art U. S. Department of Energy National Nuclear Security Administration (NNSA) representatives will host a media availability at 4 p.m. on Monday, October 28, 2002, to discuss the upcoming public scoping meeting for the development of a Modern Pit Facility. The media availability session will be held at 4 p.m. in the North Augusta Community Center, 101 Brookside Drive, North

  9. SR0503

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    14, 2005 Media Contact: James Giusti (803) 952-7697 NNSA Breaks Ground On MOX Facility Site Preparation Begins at Savannah River Site Flag Ribbon Art Aiken, S.C. - The National Nuclear Security Administration's (NNSA) plutonium disposition program today moved another step forward with the start of site preparation for its Mixed Oxide (MOX) Fuel Fabrication Facility at the Savannah River Site. NNSA Administrator Linton F. Brooks and U.S. Senator Lindsey Graham led a group of U.S. and Russian

  10. SR0704

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2004 Media Contact: Julie Petersen (803) 952-7697 Media Advisory: Media Day On SRS Accelerated Cleanup Flag Ribbon Art NOTE TO EDITORS AND NEWS DIRECTORS: AIKEN, S.C. (July 13, 2004)-Congressman J. Gresham Barrett will join senior officials of the U.S. Department of Energy-Headquarters (DOE-HQ) at the Savannah River Site (SRS) on Monday, July 19, 2004, to discuss the Site's accelerated cleanup activities. DOE-HQ officials include: Lee Otis, DOE General Counsel; Jill Sigal, DOE Principal

  11. SR0804

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 2004 Media Contact: Jim Giusti (803) 952-7697 SRS Resumes All Classified Electronic Media Work Following Stand-Down Flag Ribbon Art Aiken, S.C. -The Department of Energy's (DOE) Savannah River Site (SRS) has finished a complete inventory of classified removable electronic media (CREM) as part of a DOE-wide stand-down that was ordered by the Secretary of Energy, Spencer Abraham. DOE has permitted SRS to end the stand-down and continue normal operations that involve these classified materials,

  12. SR9806

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 1999 Media Contact: Bill Taylor (803) 725-2889 Note To Editors Flag Ribbon Art SECRETARY RICHARDSON TO VISIT SAVANNAH RIVER SITE ON JUNE 24, 1999 WHO: Secretary of Energy Bill Richardson will visit the Savannah River Site (SRS) Thursday, June 24, 1999 to make an announcement concerning the future of 10,000 acres at the site. WHAT: 8:30 am Photo opportunity only with Secretary Richardson and elected officials. 9:00 am Dedication ceremony with Secretary Richardson and South Carolina Department

  13. SR9902

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, 1999 Media Contact: Rick Ford (803) 725-2889 DOE To Present Savannah River Site's Upcoming Fiscal Year 2000 Budget Flag Ribbon Art Aiken, SC - (Jan. 28, 1999) The public is invited to view the Department of Energy's (DOE) Fiscal Year 2000 budget presentation that will be provided via satellite downlink starting at 1:00 p.m., Monday, February 1, 1999, at Aiken Technical College's Learning Resource Center amphitheater. The annual DOE budget roll out will feature an introduction by Secretary of

  14. SR9912

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    17, 1999 Media Contact: Bill Taylor (803) 725-2889 DOE Security Czar To Visit SRS August 18, 1999 Flag Ribbon Art General Eugene Habiger (USAF Ret.), the Department of Energy's Director of Security and Emergency Response will be at the Savannah River Site on Wednesday, August 18, 1999. Gen. Habiger, the former Commander-In-Chief, U.S. Strategic Command, has recently been named by the Secretary of Energy as the DOE's Security Czar. While at the Savannah River Site, he will visit first-hand

  15. SR9914

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 1999 Media Contact: Bill Taylor (803) 725-2889 SRS Vehicles Begin Era Of Alternative Fuels Flag Ribbon Art Aiken S.C. (Sept. 28, 1999) - The Savannah River Site (SRS) began a new era of alternative fuel use today when special ethanol fuel became available in two 10,000 gallon fuel storage tanks that went into operation in the A and H areas. The E85 ethanol fuel, a mixture of 85 percent ethanol and 15 percent unleaded gasoline, will allow a new fleet of alternative fuel vehicles (AFV's) to

  16. SR9916

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5, 1999 Media Contact: Bill Taylor (803) 725-2889 SRS Seeks Public Input On Updated Strategic Plan Flag Ribbon Art Aiken, SC (Dec. 15, 1999)--The Department of Energy's Savannah River Site today released for public comment the draft Savannah River Site (SRS) 2000 Strategic Plan. The draft SRS Strategic Plan 2000 has been developed with input from the Site's workforce and management team. The plan will be used to guide the missions and work performed in the Site's stewardship of the Nation's

  17. FLAG-SGH Sedov calculations (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    same physical dimensions as that for the 91 x 46 mesh, but consisting of increasing numbers of zones with refinement. Nominal mesh resolution: 91 x 46. Other mesh resolutions: 181 ...

  18. FLAG-SGH Sedov calculations (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Sponsoring Org: DOELANL Country of Publication: United States Language: English Subject: 97 MATHEMATICAL METHODS AND COMPUTING; DIMENSIONS; ENERGY SOURCES; RESOLUTION; SIMULATION; ...

  19. Ejecta modeling in the FLAG hydrocode (u) (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Authors: Fung, Jimmy 1 ; Harrison, Alan K 1 ; Margulies, Jeremy 1 ; Buttler, William T 1 ; Olson, Russell T 1 + Show Author Affiliations Los Alamos National Laboratory ...

  20. EM Celebrates Ribbon Cutting for New Biomass Plant at Savannah River Site |

    Office of Environmental Management (EM)

    Energy Achieves A+ for Government and Community Outreach, Again EM Achieves A+ for Government and Community Outreach, Again February 27, 2013 - 12:00pm Addthis WASHINGTON, D.C. - EM headquarters received an A+ grade for outreach to local governments and communities in an Energy Communities Alliance (ECA) report released today. ECA, which represents local governments impacted by DOE activities, released its Community Outreach Scorecard rating the Department's intergovernmental activities. EM

  1. EM Reviews Portsmouth, Paducah Site Contractor Performance, Determines Award Fees

    Broader source: Energy.gov [DOE]

    LEXINGTON, Ky. – EM has completed annual performance evaluations of four prime contractors working on the deactivation, decontamination, and decommissioning of the former gaseous diffusion plants near Portsmouth, Ohio and Paducah, Kentucky.

  2. FY15FinalFeeDeterminationScorecard.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  3. Incentive Fee Determination Summary Contractor: Washington Closure Hanford LLC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Incandescent Lighting Basics Incandescent Lighting Basics August 16, 2013 - 10:00am Addthis Incandescent lamps consist of a wire filament inside a glass bulb that is usually filled with inert gas, and they produce light when an electric current heats the filament to a high temperature. Incandescent lamps have a low efficacy (10-17 lumens per watt) compared with other lighting options-because most of the energy released is in the form of heat rather than light-and a short average operating life

  4. Policy Flash 2013-24 Fee Determinations: Requirement to Obtain...

    Broader source: Energy.gov (indexed) [DOE]

    Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance...

  5. Certificate of Public Good Application Fee Form | Open Energy...

    Open Energy Info (EERE)

    for in-state facilities under Sections 248a and 248 of Title 30. When applying for Public Service Board approval of an in-state facility under Sections 248a and 248, the...

  6. Contractor Fee Payments - Carlsbad Field Office | Department of Energy

    Office of Environmental Management (EM)

    System, Technical Services | Department of Energy Contract Awarded for West Valley Demonstration Project Data Management System, Technical Services Contract Awarded for West Valley Demonstration Project Data Management System, Technical Services January 20, 2016 - 12:30pm Addthis Media Contact Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Cincinnati - The Department of Energy (DOE) today announced the award a Time and Materials Task Order under the Indefinite Delivery/Indefinite

  7. Inspection of Westinghouse Savannah River Company Fees for Managing...

    Energy Savers [EERE]

    BACKGROUND: During the first five years of its contract with the Department of ... Using WSRC's actual performance scores, we estimated that, during the first five years of ...

  8. Privacy Act Fees and Time Limits | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    of the DOE to provide an individual with one copy of his or her requested records free of charge. The Act does not stipulate a time frame for an agency to provide access to...

  9. Local Option- Building Permit Fee Waivers for Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    Public Act 15-194 effective October 1st 2015, requires each municipality to incorporate residential solar photovoltaic systems on its building permit application process. The municipalities are...

  10. SNLM448-FY2011Fee(12.7.11).pdf

    National Nuclear Security Administration (NNSA)

  11. Fact #901: November 30, 2015 States Assessing Fees on Electric...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the sale of motor fuels. Because electric vehicles (EVs) do not refuel at pumps that collect state and Federal fuel taxes, they do not contribute to the upkeep of the highways. ...

  12. CHPRC_Fiscal_Year_2015_Fee_Evaluation_Summary.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  13. MSA_FY2012_Award_Fee_Scorecard.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  14. Total Estimated Contract Cost: Contract Option Period: Maximum Fee

    Office of Environmental Management (EM)

    Definition and Scope Answer/Comment 1 What significant policy challenges are likely to remain unaddressed if we employ Title XIII's definition? The following points are not referencedd in EISA 1301. ・Power provider should also control the output fluctuation of renewable resources. ・The end user should have the choice of which form of power storage to be used. Certain types of energy conservation and storage could work better in different applications (e.g. not only electricity power but also

  15. Microsoft Word - FY12 Fee Des.doc

    National Nuclear Security Administration (NNSA)

    NR0000031 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be

  16. Award Fee Determination Scorecard Contractor: Mission Support Alliance, LLC (MSA)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Aviation Manager Joseph Ginanni Joseph Ginanni July 2009 U.S. General Services Administration (GSA) Federal Aviation Professional Award Aviation Manager Joseph Ginanni has received the U.S. General Services Administration (GSA) Federal Aviation Professional Award. Ginanni oversees the Aviation Services Department of the NNSA/NSO Remote Sensing Laboratory at Nellis and Andrews Air Force Bases. The program provides aerial support to the NNSA Office of Emergency Response, which protects people from

  17. Nyseg non-residential adjustment fees? | OpenEI Community

    Open Energy Info (EERE)

    MFC on Nyseg's site and each is less than 0.005kWh. That being said, the posted value matches my expectations more for high New York electricity rates (0.16kWh). Am I missing...

  18. Nuclear Nonproliferation and Arms Control Primer Prepared for the Blue Ribbon Commission on America’s Nuclear Future

    SciTech Connect (OSTI)

    Williams, Laura S.

    2011-05-25

    To provide a brief overview of key arms control and nonproliferation arrangements for the layperson that may be relevant to the Commission's comprehensive review of policies for managing the back end of the nuclear fuel cycle. Primer would be published by the Commission and made publicly available, probably as an appendix to a larger Commission report.

  19. Total Estimated Contract Cost: Performance Period

    Office of Environmental Management (EM)

    FY2012 Fee Information Minimum Fee Maximum Fee September 2015 Contract Number: Cost Plus Incentive Fee Contractor: 3,264,909,094 Contract Period: EM Contractor Fee s Idaho...

  20. BPA-2014-01267-FOIA Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - D-131 Subject: Case No FIA-14-0030 Follow Up Flag: Follow up Flag Status: Flagged Hi Kimm, Pursuant to the FOIA, I request all communication between the hearing officer and...

  1. Reduced AC losses in HTS coated conductors

    DOE Patents [OSTI]

    Ashworth, Stephen P.

    2004-10-05

    Methods for reducing hysteresis losses in superconductor coated ribbons where a flux distribution is set into the superconductor coated ribbon prior to the application of alternating current.

  2. Klotz | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    remarks at PREP ribbon-cutting Under Secretary Klotz delivered remarks at the Pantex Renewable Energy Project (PREP) ribbon-cutting this week. PREP establishes the largest...

  3. Low-Cost Manufacturing of High-Efficiency, High-Reliability String Ribbon Si PV Modules: Final Subcontract Report, 24 June 2005 - 31 October 2008

    SciTech Connect (OSTI)

    Felton, L.

    2009-05-01

    Presents 2008 overall process improvements in adaptive thermal process, cut-on-the-fly manufacturing, and lamination.

  4. FY 2012 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    12 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2012 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  5. FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2010 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  6. FY 2008 Washington Savannah River Company, LLC, PER Summary ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2008 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  7. FY 2006 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    6 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2006 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  8. FY 2011 Los Alamos National Security, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2011 Los Alamos National Security, LLC, PER Summary SUMMARY OF FY 2011 LOS ALAMOS NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  9. FY 2007 Los Alamos National Security, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2007 Los Alamos National Security, LLC, PER Summary SUMMARY OF FY 2007 LOS ALAMOS NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  10. FY 2006 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2006 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2006 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  11. FY 2011 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2011 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2011 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  12. FY 2009 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2009 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2009 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  13. FY 2010 Lawrence Livermore National Security, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2010 Lawrence Livermore National Security, LLC, PER Summary SUMMARY OF FY 2010 LAWRENCE LIVERMORE NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee ...

  14. B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ......... 6 B.8 AWARD FEE ADMINISTRATION ......Cost through Mod 364 10,895,964,333 Fee: A Final Fee Determination - Pre-Mod No. ...

  15. FY 2007 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2007 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2007 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  16. FY 2008 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2008 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2008 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  17. FY 2009 Los Alamos National Security, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2009 Los Alamos National Security, LLC, PER Summary SUMMARY OF FY 2009 LOS ALAMOS NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  18. FY 2006 University of California (LLNL), PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2006 University of California (LLNL), PER Summary SUMMARY OF FY 2006 UNIVERISTY OF CALIFORNIA AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 4,300,000 ...

  19. FY 2008 Lawrence Livermore National Security, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2008 Lawrence Livermore National Security, LLC, PER Summary SUMMARY OF FY 2008 LAWRENCE LIVERMORE NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee ...

  20. FY 2006 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2006 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2006 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  1. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 B.2 ESTIMATED COST, BASE FEE, AND AWARD FEE (NOV 2004) ...... 3 B.3 ......... 8 B.5 DETERMINATION OF AWARD FEE EARNED (NOV 2004) ...

  2. FY 2009 Lawrence Livermore National Security, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2009 Lawrence Livermore National Security, LLC, PER Summary SUMMARY OF FY 2009 LAWRENCE LIVERMORE NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee ...

  3. FY 2011 Lawrence Livermore National Security, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2011 Lawrence Livermore National Security, LLC, PER Summary SUMMARY OF FY 2011 LAWRENCE LIVERMORE NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee ...

  4. FY 2008 Los Alamos National Security, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2008 Los Alamos National Security, LLC, PER Summary SUMMARY OF FY 2008 LOS ALAMOS NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  5. FY 2010 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2010 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2010 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  6. FY 2009 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2009 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2009 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  7. FY 2011 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2011 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2011 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  8. FY 2007 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2007 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2007 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  9. FY 2006 University of California (LANL), PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2006 University of California (LANL), PER Summary SUMMARY OF FY 2006 UNIVERSITY OF CALIFORNIA AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 5,800,000 ...

  10. FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2010 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  11. FY 2008 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2008 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2008 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  12. FY 2010 Los Alamos National Security, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2010 Los Alamos National Security, LLC, PER Summary SUMMARY OF FY 2011 LOS ALAMOS NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  13. Fee Waiver and Reduction Criteria | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal, State, and Local Coordination Federal, State, and Local Coordination ISER's success in supporting the national security mission relies heavily upon the ability to partner and coordinate with numerous Federal, State, local and tribal government agencies and organizations, domestic and international private and public energy sectors, other DOE offices, and DOE National Laboratories. Some of these partners include: Federal Partners: White House National Security Staff (NSS), Federal

  14. EM Richland Operations Office Contractor Earns 97 Percent of Available Fee

    Office of Environmental Management (EM)

    EM News EM News RSS May 18, 2016 Registration Now Open for 2016 National Cleanup Workshop in September WASHINGTON, D.C. - Registration is now open for the second-annual National Cleanup Workshop, set to be held on Sept. 14-15, 2016, at the Hilton Alexandria Mark Center in Alexandria, Va. May 16, 2016 EM Assistant Secretary Monica Regalbuto, directly left of the Tank Closure Monument, gathers with federal and contractor employees at SRS. Cheers to 20 Years and 8 Tanks: EM, SRR Celebrate Major

  15. EM's West Valley Cleanup Contactor Receives 85 Percent of Available Fee

    Office of Environmental Management (EM)

    Rolls Out Fiscal Year 2014 Budget Request EM Rolls Out Fiscal Year 2014 Budget Request April 10, 2013 - 12:00pm Addthis WASHINGTON, D.C. - Today EM Senior Advisor David Huizenga rolled out a $5.622 billion budget request for fiscal year 2014 that enables EM progress in all areas of the nuclear cleanup program while maintaining safety and compliance across the complex. "The President's Fiscal Year 2014 Budget Request of $5.622 billion provides the resources to clean up the Cold War legacy

  16. How to find fees, taxes, and other charges built into rate in...

    Open Energy Info (EERE)

    and other charges built into rate in different locations Home > Groups > Utility Rate Hi, I am looking to find the rate charges beyond demand, generation, and transmission that...

  17. Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE

    Broader source: Energy.gov [DOE]

    Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at ...

  18. HPMC_FY14_Performance_Assessment-Performance_Fee_Determination.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  19. FY14 AWARD FEE DETERMINATION SCORECARD Contractor: Wastren-EnergX...

    Office of Environmental Management (EM)

    for the period. Significant Achievements: * Received the Federal Electronic Challenge Gold Award illustrating the site's commitment to sustainability. * Deployed the Virtual...

  20. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    15 (Fixed Fee) 346,377,995 Fee Information 2,039,246 EM Contractor Fee Oak Ridge Office - Oak Ridge, TN Transuranic Waste Processing Contract September 2015 Cost Plus Award Fee...

  1. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    350,000 Cumulative Fee 1,950,000 564,955 HPM Corporation DE-EM0002043 Firm Fixed Price Plus Award Fee Fee Information 0 October 1, 2012 - September 30, 2014 EM Contractor Fee...

  2. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Cost (Price of base): Contract Base Period: Contract Option Period: Minimum Fee Maximum Fee (Base Only) Performance Period Fee Available Fee Earned FY2012 15,763,807 15,087,078...

  3. U. S. Department of Energy Savannah River Operations Office - Contractor

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Contractor Performance Contractor Performance SRNS FY 15 Award Fee Determination Scorecard Adobe Acrobat PDF FY 14 Award Fee Determination Scorecard Adobe Acrobat PDF FY 13 Award Fee Determination Scorecard Adobe Acrobat PDF Award Fee Determination for FY 13 Adobe Acrobat PDF Award Fee Determination for FY 12 Adobe Acrobat PDF Award Fee Determination for FY 11 Adobe Acrobat PDF Award Fee Determination for FY 10 Adobe Acrobat PDF Award Fee Determination for FY 09 Adobe Acrobat PDF

  4. Process for fabricating continuous lengths of superconductor

    DOE Patents [OSTI]

    Kroeger, Donald M.; List, III, Frederick A.

    1998-01-01

    A process for manufacturing a superconductor. The process is accomplished by depositing a superconductor precursor powder on a continuous length of a first substrate ribbon, overlaying a continuous length of a second substrate ribbon on said first substrate ribbon, and applying sufficient pressure to form a bound layered superconductor precursor between said first substrate ribbon and said second substrates ribbon. The layered superconductor precursor is then heat treated to form a super conductor layer.

  5. Comprehensive Fuel Cycle - Community Perspective - 13093

    SciTech Connect (OSTI)

    McLeod, Richard V.; Frazier, Timothy A.

    2013-07-01

    Should a five-county region surrounding the Department of Energy's Savannah River Site ('SRS') use its assets to help provide solutions to closing the nation's nuclear fuel cycle? That question has been the focus of a local ad hoc multi-disciplinary community task force (Tier I) that has been at work in recent months outlining issues and identifying unanswered questions to determine if assuming a leadership role in closing the nuclear fuel cycle is in the community's interest. If so, what are the terms and conditions under which we the community would agree to participate? Our starting point was the President's Blue Ribbon Commission on America's Nuclear Future ('Commission') which made a total of eight (8) recommendations in its final report. There are several recommendations that are directly relevant to the Tier I group and potential efforts of the Region. These are the 'consent-based approach', the creation of an independent nuclear waste management entity funded from the existing nuclear waste fee; the 'prompt efforts to develop one or more consolidated storage facilities', and 'continued U.S. innovation in nuclear energy technology and for workforce development'. (authors)

  6. Investigation and evaluation of geopressured-geothermal wells. Final report, Tenneco Fee N No. 1 Well Terrebonne Paris, Louisiana

    SciTech Connect (OSTI)

    Dobson, R.J.; Hartsock, J.H.; McCoy, R.L.; Rodgers, J.A.

    1980-09-01

    The reservoir conditions that led to the choice of this well as the fifth well of opportunity are described as well as the attempts to complete the well for high-volume brine production. Individual opinions concerning underlying and conributing causes for the liner failure which aborted the completion attempt are included. (MHR)

  7. Interactive Jobs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The following command requests 2 nodes using the interactive queue. hopper% qsub -I -q debug -l mppwidth48 The -I flag specifies an interactive job. The -q flag specifies the...

  8. AES Appendix SFA-1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.-Flag...

  9. Microsoft Word - CI-ON Appendix SFA-1 (Rev 2.1, 5-22-15).doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.-Flag...

  10. AES Appendix SFA-1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.- Flag...

  11. Microsoft Word - LFS Appendix SFA-1 (Rev. 8.1, 5-22-15).doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.- Flag...

  12. Microsoft Word - NCIPO Appendix SFA-1 (Rev 1.1, 5-22-15).doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.-Flag...

  13. Microsoft Word - CI-OFF Appendix SFA-1 (Rev 2.1, 5-22-15).doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.-Flag...

  14. Microsoft Word - R&D Appendix SFA-1 (Rev 3.1, 5-22-15).doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.- Flag...

  15. Microsoft Word - AES Appendix SFA-1 (Rev. 8.1, 5-22-15)[1].doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.- Flag...

  16. Microsoft Word - EFS Appendix SFA-1 (Rev. 6.1, 5-22-15).doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.- Flag...

  17. Microsoft Word - TM Appendix SFA-1 (Rev. 7.1, 5-22-15).doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.- Flag...

  18. Microsoft Word - CONST Appendix SFA-1 (Rev. 4.1, 5-22-15).doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.- Flag...

  19. SFS Appendix SFA-1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.-Flag...

  20. Microsoft Word - IDIQ BS Appendix SFA-1 (Rev. 3.1, 5-22-15).doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.- Flag...

  1. Microsoft Word - D-B CONST Appendix SFA-1 (Rev. 3.1, 5-22-15...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.- Flag...

  2. EERE Success Story-Washington: Putting More Solar on More Rooftops...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    with a ribbon cutting at the Auto-Spa car wash. Mercer Island celebrates the 500th Solarize installation in the state of Washington with a ribbon cutting at the Auto-Spa car wash. ...

  3. Washington: Putting More Solar on More Rooftops in Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    with a ribbon cutting at the Auto-Spa car wash. Mercer Island celebrates the 500th Solarize installation in the state of Washington with a ribbon cutting at the Auto-Spa car wash. ...

  4. Displaced capillary dies

    DOE Patents [OSTI]

    Kalejs, Juris P. (Wellesley, MA); Chalmers, Bruce (Falmouth, MA); Surek, Thomas (Englewood, CO)

    1982-01-01

    An asymmetrical shaped capillary die made exclusively of graphite is used to grow silicon ribbon which is capable of being made into solar cells that are more efficient than cells produced from ribbon made using a symmetrically shaped die.

  5. Displaced capillary dies

    DOE Patents [OSTI]

    Kalejs, Juris P. (Wellesley, MA); Chalmers, Bruce (Falmouth, MA); Surek, Thomas (Englewood, CO)

    1984-01-01

    An asymmetrical shaped capillary die made exclusively of graphite is used to grow silicon ribbon which is capable of being made into solar cells that are more efficient than cells produced from ribbon made using a symmetrically shaped die.

  6. World's First Fuel Cell Cargo Trucks Deployed at Memphis International...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A ribbon-cutting ceremony was held on April 9 to mark the kickoff of the two-year ... The ribbon cutting ceremony was hosted by FedEx Express and attended by U.S. Congressman ...

  7. COMMODITIES USED BY WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Flags, Poles, Banners & Accessories ? Fuel, Oil, Grease & Lubricants ? Gases ? Germicides ... Printing & Related Services ? Publications & Audiovisual Material ? Pumping Equipment & ...

  8. ARM - Datastreams - mwrhf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    flag None surfacerainflag ( time ) Ambient surface relative humidity % surfacerelativehumidity ( time ) Ambient surface temperature degC surfacetemperature ( time ) Microwave...

  9. Report of the Infrastructure Task Force of the Nuclear Energy Research

    Office of Environmental Management (EM)

    Research Foundation | Department of Energy Blue Ribbon Panel on the Review of the Radiation Effects Research Foundation Report of the Blue Ribbon Panel on the Review of the Radiation Effects Research Foundation October 11, 1995 This report summarizes the findings of the Blue Ribbon Panel's review of the RERF scientific projects and future research plans The report recommended that the core studies be continued for the next 20 years. PDF icon Report of the Blue Ribbon Panel on the Review of

  10. THE 2011 FEBRUARY 15 X2 FLARE, RIBBONS, CORONAL FRONT, AND MASS EJECTION: INTERPRETING THE THREE-DIMENSIONAL VIEWS FROM THE SOLAR DYNAMICS OBSERVATORY AND STEREO GUIDED BY MAGNETOHYDRODYNAMIC FLUX-ROPE MODELING

    SciTech Connect (OSTI)

    Schrijver, Carolus J.; Title, Alan M.; Aulanier, Guillaume; Pariat, Etienne; Delannee, Cecile E-mail: title@lmsal.com E-mail: etienne.pariat@obspm.fr

    2011-09-10

    The 2011 February 15 X2.2 flare and associated Earth-directed halo coronal mass ejection were observed in unprecedented detail with high resolution in spatial, temporal, and thermal dimensions by the Atmospheric Imaging Assembly (AIA) on the Solar Dynamics Observatory, as well as by instruments on the two STEREO spacecraft, then at near-quadrature relative to the Sun-Earth line. These observations enable us to see expanding loops from a flux-rope-like structure over the shearing polarity-inversion line between the central {delta}-spot groups of AR 11158, developing a propagating coronal front ('EIT wave'), and eventually forming the coronal mass ejection moving into the inner heliosphere. The observations support the interpretation that all of these features, including the 'EIT wave', are signatures of an expanding volume traced by loops (much larger than the flux rope only), surrounded by a moving front rather than predominantly wave-like perturbations; this interpretation is supported by previously published MHD models for active-region and global scales. The lateral expansion of the eruption is limited to the local helmet-streamer structure and halts at the edges of a large-scale domain of connectivity (in the process exciting loop oscillations at the edge of the southern polar coronal hole). The AIA observations reveal that plasma warming occurs within the expansion front as it propagates over quiet Sun areas. This warming causes dimming in the 171 A (Fe IX and Fe X) channel and brightening in the 193 and 211 A (Fe XII-XIV) channels along the entire front, while there is weak 131 A (Fe VIII and Fe XXI) emission in some directions. An analysis of the AIA response functions shows that sections of the front running over the quiet Sun are consistent with adiabatic warming; other sections may require additional heating which MHD modeling suggests could be caused by Joule dissipation. Although for the events studied here the effects of volumetric expansion are much more obvious than true wave phenomena, we discuss how different magnetic environments within and around the erupting region can lead to the signatures of either or both of these aspects.

  11. Major Contracts Summary | Department of Energy

    Energy Savers [EERE]

    Contracts Summary Major Contracts Summary PDF icon Major Contracts Summary More Documents & Publications Contractor Fee Payments - Savannah River Operations Office Contractor Fee Payments - Office of River Protection Contractor Fee Payments - Richland Operations Office

  12. Interconnection Standards

    Broader source: Energy.gov [DOE]

    Fees for interconnection requests increase with each Level. A Level 1 request must submit $50 fee; a Level 2 request must submit a fee of $50 plus $1/kW of generator capacity; a Level 3 request m...

  13. Total Estimated Contract Cost: Contract Option Period: Performance

    Office of Environmental Management (EM)

    Contractor: Bechtel National Inc. Contract Number: DE-AC27-01RV14136 Contract Type: Cost Plus Award Fee NA Maximum Fee 599,588,540 Fee Available 102,622,325 10,868,785,789...

  14. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Cumulative Fee 5,985,266 2,636,218 5,985,266 Portage, Inc. DE-DT0002936 NA Cost Plus Award Fee 131,545,597 November 4, 2011 - September 30, 2016 0 EM Contractor Fee...

  15. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Broader source: Energy.gov (indexed) [DOE]

    Cumulative Fee 570,363,260 394,157,083 EM Contractor Fee Savannah River Site Office, Aiken, SC Management & Operating Contract June 2015 DE-AC09-08SR22470 Cost Plus Award Fee...

  16. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B.2 ESTIMATED COST, BASE FEE, AND AWARD FEE (NOV 2004) (a) The contract period of ... B.5 DETERMINATION OF AWARD FEE EARNED (DEC 2006) (a) There shall be no annual ...

  17. FY 2010 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2010 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2010 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 49,850,664 ...

  18. SECTION M_Evaluation Factors

    National Nuclear Security Administration (NNSA)

    ... For the best value determination as described in M-2 above, the total evaluated price ... total proposed maximum fixed fee and award fee for (CLIN 0001) and the fixed fee for CLIN ...

  19. FY 2007 BWXT Pantex, LLC, PER Summary | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    FY 2007 BWXT Pantex, LLC, PER Summary SUMMARY OF FY 2007 BWXT PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 33,395,888 30,676,159 91.9% BWXT Pantex, the ...

  20. FY 2006 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2006 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2006 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 44,662,551 ...

  1. FY 2007 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2007 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2007 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 45,794,393 ...

  2. Port~rnuuth IJcconllimi1rntion nml Decommissioning...

    Office of Environmental Management (EM)

    I l>E*ACJO-IOCCOOl7 FY-15 and FY-16 AWARD FEE PLAN for Fluor-B& W Portsmouth, LLC ... assists the FDO in the award fee determination by recommending an award fee for the ...

  3. FY 2008 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2008 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2008 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 51,713,121 ...

  4. FY 2010 Babcock & Wilcox Technical Services Pantex, LLC, PER...

    National Nuclear Security Administration (NNSA)

    FY 2010 Babcock & Wilcox Technical Services Pantex, LLC, PER Summary SUMMARY OF FY 2010 B&W PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 37,618,000 ...

  5. FY 2009 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2009 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2009 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 49,731,271 ...

  6. FY 2008 Babcock & Wilcox Technical Services Pantex, LLC, PER...

    National Nuclear Security Administration (NNSA)

    FY 2008 Babcock & Wilcox Technical Services Pantex, LLC, PER Summary SUMMARY OF FY 2008 B&W PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 36,114,000 ...

  7. FY 2009 Babcock & Wilcox Technical Services Pantex, LLC, PER...

    National Nuclear Security Administration (NNSA)

    FY 2009 Babcock & Wilcox Technical Services Pantex, LLC, PER Summary SUMMARY OF FY 2009 B&W PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 33,478,579 ...

  8. FY 2011 Babcock & Wilcox Technical Services Pantex, LLC, PER...

    National Nuclear Security Administration (NNSA)

    FY 2011 Babcock & Wilcox Technical Services Pantex, LLC, PER Summary SUMMARY OF FY 2011 B&W PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 34,878,800 ...

  9. FY 2006 BWXT Pantex, LLC, PER Summary | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    FY 2006 BWXT Pantex, LLC, PER Summary SUMMARY OF FY 2006 BWXT PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 29,875,417 27,501,337 92.1% BWXT Pantex, the ...

  10. FY 2007 University of California, PER Summary | National Nuclear...

    National Nuclear Security Administration (NNSA)

    FY 2007 University of California, PER Summary SUMMARY OF FY 2007 UNIVERSITY OF CALIFORNIA AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 4,300,000 3,956,000 92% ...

  11. FY 2011 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2011 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2011 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 52,532,710 ...

  12. Portland HQ Letterhead

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "All award fee letters to Management and Operations Contractors at Department of Energy facilities in which an award fee was reduced or eliminated as a result of a...

  13. Richland Operations Office's Fiscal...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2013 through September 2014 (fiscal year 2014) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 9,815,000 Award Fee Earned:...

  14. Richland Operations Office's Fiscal Year 2013...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2012 through September 2013 (fiscal year 2013) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 14,092,235 (includes fee set...

  15. Slide 1

    Broader source: Energy.gov (indexed) [DOE]

    Late payment fee assessed, which typically is higher than the prompt payment interest. Frauddelinquency losses borne by the bank Comparison of Charge Card FeesLiabilities Office...

  16. BPA-2011-00940-FOIA Request

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    photocopies Type of Requester (if provided): An individual seeking information for personal use and not for commercial use. Fees and Fee Waivers: I request a waiver or...

  17. Microsoft Word - DE-AC06-09RL15009 Section B.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    This is a fixed-unit price plus award fee service contract for Workers' Compensation ... Procedures for Determination of the Performance Based Fee. 1. The total performance ...

  18. Portsmouth Environmental Technical Services II Contract No: DE...

    Office of Environmental Management (EM)

    ......... 6 8.0 Award Fee Terms ......The individual who makes the final determination of the amount of fee to be awarded to ...

  19. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... The clause section should read: October 1, 2011 - September 30, 2012 Base Fee: 0 Award Fee... of Labor requests, upon a determination by the Administrator, the ...

  20. Contractor: Restoration Services, Inc. Contract: DE-EM0002639

    Office of Environmental Management (EM)

    Restoration Services, Inc. Contract: DE-EM0002639 Award Fee Evaluation Period 2 Determination Scorecard Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September ...

  1. Oregon Underground Injection Control Registration Application...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Form: Oregon Underground Injection Control Registration Application Fees (DEQ Form UIC 1003-GIC) Abstract Required fees and form...

  2. Certification and Rating of Attachments for Fenestration Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... can be completed toward the middle of the project period rather than at the beginning. ... Labeling Fees, Certification Fees Budget History 10012014- FY 2015 (past) FY 2016 ...

  3. Multiple-Award Contracts and Governmentwide Acquisition Contracts...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Competition Requirements 8.4 Federal Supply Schedules 9.1 Responsible Prospective ... annual ceilings on user fees that can result in greatly reduced aggregate fee percentages. ...

  4. G

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to the Contractor for that incentive and for the Contractor to have any right to retain the provisionally paid fee. Regarding the requirements for provisional payment of fee...

  5. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Target Fee Maximum Fee Performance Period Fee Available Fee Earned FY2016 $10,604,604 $0 FY2017 $9,656,288 $0 Cumulative Fee $20,260,892 $0 EM Contractor Fee Los Alamos Los Alamos Legacy Cleanup Bridge Contract March 2016 $20,260,892 CPAF Los Alamos National Security LLC $310,227,124 DE-EM0003528 $0 Fee Information September 30, 2015 - September 30, 2016 $0 October 1, 2016 - March 31, 2017 (Option Period 1) April 1, 2017 - September 30, 2017 (Option Period 2)

  6. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Available Fee Earned FY2015 $5,553,915 $0 FY2016 $5,553,915 $0 FY2017 $5,553,915 Cumulative Fee $16,661,745 DE-EM0001131-DE-DT0007774 EM Contractor Fee March 2016 Portsmouth Paducah Project Office Paducah Deactivation Task Order Fluor Federal Services $16,661,745 N/A $0 Cost Plus Award Fee and FFP $422,000,000 July 22, 2014 - July 21, 2017 Fee Information

  7. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Available Fee Earned FY2014 $389,929 $358,735 FY2015 $392,092 $360,725 FY2016 $397,054 FY2017 (Option) $0 FY2018 (Option) $0 Cumulative Fee $1,179,075 $719,460 $1,179,075 Cost Plus Award Fee $51,615,957 October 1, 2013 - September 30, 2016 Fee Information $0 Option 1: 10/1/16 - 9/30/18 DE-EM0002639 EM Contractor Fee March 2016 Portsmouth Paducah Project Office Portsmouth Environmental Technical Services II Restoration Services Inc

  8. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Availability Fee Earned FY2013 $300,000 $284,250 FY2014 $310,000 $280,705 FY2015 $320,000 $287,680 FY2016 $330,000 FY2017 $340,000 FY2018 $350,000 Cumulative Fee $1,950,000 $852,635 EM Contractor Fee Richland Operations Office - Richland, WA Occupational Medical Services at Hanford March 2016 $100,100,000 $1,950,000 Option 2: 10/1/15 -9/30/16 (Exercised) HPM Corporation DE-EM0002043 Firm Fixed Price Plus Award Fee Fee Information $0 October 1, 2012 -

  9. Contractors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    packaging, and shipping of all remote-handled and contact-handled transuranic waste. ... Related Links UCOR WAI Isotek Contracts & Fee Determinations UCOR Contract & Fee ...

  10. Continuous lengths of oxide superconductors

    DOE Patents [OSTI]

    Kroeger, Donald M.; List, III, Frederick A.

    2000-01-01

    A layered oxide superconductor prepared by depositing a superconductor precursor powder on a continuous length of a first substrate ribbon. A continuous length of a second substrate ribbon is overlaid on the first substrate ribbon. Sufficient pressure is applied to form a bound layered superconductor precursor powder between the first substrate ribbon and the second substrate ribbon. The layered superconductor precursor is then heat treated to establish the oxide superconducting phase. The layered oxide superconductor has a smooth interface between the substrate and the oxide superconductor.

  11. Apparatus for fabricating continuous lengths of superconductor

    DOE Patents [OSTI]

    Kroeger, Donald M.; List, III, Frederick A.

    2001-01-01

    A process and apparatus for manufacturing a superconductor. The process is accomplished by depositing a superconductor precursor powder on a continuous length of a first substrate ribbon, overlaying a continuous length of a second substrate ribbon on said first substrate ribbon, and applying sufficient pressure to form a bound layered superconductor comprising a layer of said superconducting precursor powder between said first substrate ribbon and said second substrates ribbon. The layered superconductor is then heat treated to establish the superconducting phase of said superconductor precursor powder.

  12. Apparatus for fabricating continuous lengths of superconductor

    DOE Patents [OSTI]

    Kroeger, Donald M.; List, III, Frederick A.

    2002-01-01

    A process and apparatus for manufacturing a superconductor. The process is accomplished by depositing a superconductor precursor powder on a continuous length of a first substrate ribbon, overlaying a continuous length of a second substrate ribbon on said first substrate ribbon, and applying sufficient pressure to form a bound layered superconductor comprising a layer of said superconducting precursor powder between said first substrate ribbon and said second substrates ribbon. The layered superconductor is then heat treated to establish the superconducting phase of said superconductor precursor powder.

  13. Centrifugally decoupling touchdown bearings

    DOE Patents [OSTI]

    Post, Richard F

    2014-06-24

    Centrifugally decoupling mechanical bearing systems provide thin tensioned metallic ribbons contained in a support structure. This assembly rotates around a stationary shaft being centered at low speeds by the action of the metal ribbons. Tension springs are connected on one end to the ribbons and on the other end to the support structure. The ribbons pass through slots in the inner ring of the support structure. The spring preloading thus insures contact (or near-contact) between the ribbons and the shaft at rotation speeds below the transition speed. Above this speed, however, the centrifugal force on the ribbons produces a tensile force on them that exceeds the spring tensile force so that the ribbons curve outward, effectively decoupling them from mechanical contact with the shaft. They still remain, however, in position to act as a touchdown bearing in case of abnormally high transverse accelerations.

  14. Fact #900: November 23, 2015 States Tax Gasoline at Varying Rates...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... & cleanup fee New Hampshire 22.20 1.63 23.83 Oil discharge cleanup fee New Jersey 10.50 4.00 14.50 Petroleum fee New Mexico 17.00 1.88 18.88 Petroleum loading fee New York ...

  15. Microsoft Word - CSC Scorecard.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fee Determination Posting Requirements Office of Environmental Management Attachment 2 Award Fee Determination Scorecard Contractor: Computer Sciences Corporation (CSC) Contract: Occupational Health Services Contract Number: DE-AC06-04RL14383 Award Period: 10/01/2011 to 09/30/2012 Basis of Evaluation: Performance and Evaluation Plan (PEMP) for Period FY 2012 Award Fee Available: $916,130.00 Award Fee Earned: $824,517.00 (90%) Award Fee Area Adjectival Ratings: Performance Incentive Allocated

  16. Method for compression of binary data

    DOE Patents [OSTI]

    Berlin, Gary J.

    1996-01-01

    The disclosed method for compression of a series of data bytes, based on LZSS-based compression methods, provides faster decompression of the stored data. The method involves the creation of a flag bit buffer in a random access memory device for temporary storage of flag bits generated during normal LZSS-based compression. The flag bit buffer stores the flag bits separately from their corresponding pointers and uncompressed data bytes until all input data has been read. Then, the flag bits are appended to the compressed output stream of data. Decompression can be performed much faster because bit manipulation is only required when reading the flag bits and not when reading uncompressed data bytes and pointers. Uncompressed data is read using byte length instructions and pointers are read using word instructions, thus reducing the time required for decompression.

  17. Method for compression of binary data

    DOE Patents [OSTI]

    Berlin, G.J.

    1996-03-26

    The disclosed method for compression of a series of data bytes, based on LZSS-based compression methods, provides faster decompression of the stored data. The method involves the creation of a flag bit buffer in a random access memory device for temporary storage of flag bits generated during normal LZSS-based compression. The flag bit buffer stores the flag bits separately from their corresponding pointers and uncompressed data bytes until all input data has been read. Then, the flag bits are appended to the compressed output stream of data. Decompression can be performed much faster because bit manipulation is only required when reading the flag bits and not when reading uncompressed data bytes and pointers. Uncompressed data is read using byte length instructions and pointers are read using word instructions, thus reducing the time required for decompression. 5 figs.

  18. Geopressured-geothermal drilling and testing plan: Magma Gulf/Technadril-Dept. of Energy MGT-DOE AMOCO Fee No. 1 well, Cameron Parish, Lousiana

    SciTech Connect (OSTI)

    Not Available

    1980-07-01

    The following topics are covered: generalized site activities, occupational health and safety, drilling operations, production testing, environmental assessment and monitoring plan, permits, program management, reporting, and schedule. (MHR)

  19. Sweet Lake geopressured-geothermal project, Magma Gulf-Technadril/DOE Amoco fee. Volume III. Final report. Annual report, February 1982-March 1985

    SciTech Connect (OSTI)

    Durham, C.O. Jr.; O'Brien, F.D.; Rodgers, R.W.

    1985-01-01

    This report presents the results of the testing of Sand 3 (15,245 to 15,280 feet in depth) which occurred from November 1983 to March 1984 and evaluates these new data in comparison to results from the testing of Sand 5 (15,385 to 15,415 feet in depth) which occurred from June 1981 to February 1982. It also describes the reworking of the production and salt water disposal wells preparatory to the Sand 3 testing as well as the plug and abandon procedures requested to terminate the project. The volume contains two parts: Part 1 includes the text and accompanying plates, figures and tables; Part 2 consists of the appendixes including auxiliary reports and tabulations.

  20. Implementation of the REAL ID Act | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hydrocode (Technical Report) | SciTech Connect Implementation and Validation of the BHR Turbulence Model in the FLAG Hydrocode Citation Details In-Document Search Title: Implementation and Validation of the BHR Turbulence Model in the FLAG Hydrocode The BHR-2 turbulence model, developed at Los Alamos National Laboratory for variable density and compressible flows, is implemented in an Arbitrary Lagrangian-Eulerian hydrocode, FLAG. The BHR-2 formulation is discussed, with emphasis on its

  1. ARM - Data Announcements Article

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 26, 2010 [Data Announcements] Radiatively Important Parameters Best Estimate Data Available for Southern Great Plains Bookmark and Share The upper panel shows the output aerosol extinction field in RIPBE, and the bottom panel shows the quality control (qc) flags on aerosol extinction. Descriptions of the qc flags are given in the netCDF file header. In this case, the gold and pink qc flags on the aerosol extinction indicate periods at the top of the aerosol profile where data were

  2. Microsoft Word - BRC Charter

    Energy Savers [EERE]

    Blue Ribbon Commission on America's Nuclear Future U.S. Department of Energy Advisory Committee Charter 1. Committee's Official Designation. Blue Ribbon Commission on America's Nuclear Future (the Commission). 2. Authority. The Commission is being established in accordance with the provisions of the Federal Advisory Committee Act (FACA), as amended, 5 U.S.C. App. 2, and as directed by the President's Memorandum for the Secretary of Energy dated January 20, 2010: Blue Ribbon Commission on

  3. Statement from Acting Department of Energy Press Secretary Damien LaVera on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Blue Ribbon Commission's Interim Recommendations | Department of Energy Acting Department of Energy Press Secretary Damien LaVera on the Blue Ribbon Commission's Interim Recommendations Statement from Acting Department of Energy Press Secretary Damien LaVera on the Blue Ribbon Commission's Interim Recommendations July 29, 2011 - 3:27pm Addthis "The Obama Administration continues to believe that nuclear energy has an important role to play as America moves to a clean energy future.

  4. Polymer film composite transducer

    DOE Patents [OSTI]

    Owen, Thomas E.

    2005-09-20

    A composite piezoelectric transducer, whose piezoeletric element is a "ribbon wound" film of piezolectric material. As the film is excited, it expands and contracts, which results in expansion and contraction of the diameter of the entire ribbon winding. This is accompanied by expansion and contraction of the thickness of the ribbon winding, such that the sound radiating plate may be placed on the side of the winding.

  5. Sensor assembly

    DOE Patents [OSTI]

    Bennett, Thomas E.; Nelson, Drew V.

    2004-04-13

    A ribbon-like sensor assembly is described wherein a length of an optical fiber embedded within a similar lengths of a prepreg tow. The fiber is ""sandwiched"" by two layers of the prepreg tow which are merged to form a single consolidated ribbon. The consolidated ribbon achieving a generally uniform distribution of composite filaments near the embedded fiber such that excess resin does not ""pool"" around the periphery of the embedded fiber.

  6. CoverSheet

    Office of Scientific and Technical Information (OSTI)

    86 Approved for public release; distribution is unlimited. Title: Implementation and Validation of the BHR Turbulence Model in the FLAG Hydrocode Author(s): Denissen, Nicholas A....

  7. FFATA sub reporting data model_draft_100715.xls

    Office of Environmental Management (EM)

    Type Data Source: Primary Data Source: Secondary Awardee can flag for correction if derived from FAADS+ (YN) Notes to Federal agencies Note: This column will be removed after...

  8. This Week In Petroleum Printer-Friendly Version

    Gasoline and Diesel Fuel Update (EIA)

    in the corresponding monthly surveys. Several quality control procedures are executed. Cell values determined to be unusual or inconsistent with other cell values are flagged. The...

  9. ARM - PI Product - SGP and TWP (Manus) Ice Cloud Vertical Velocities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    removed, however a multi-layer flag is included. Data Details Contact Heike Kalesse Leibniz Institute for Tropospheric Research kalesse@tropos.de Permoserstr. 15 Leipzig, 04318...

  10. Daniel Udwary NERSC Data Science Engagement Group"

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    resource management (such as Torque) and job scheduling (such as Moab) into one system. ... parallel jobs (as with "aprun" with TorqueMoab) * srun flags overwrite SBATCH keywords * ...

  11. RAPID/Roadmap/9-FD-a | Open Energy Information

    Open Energy Info (EERE)

    will help to identify the universe of matters that need to be addressed with particular care and flag issues for thorough consideration, thereby defusing potential conflict that,...

  12. splitt(1)-99.PDF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Introduction Algorithms for assessing Solar Infrared Station (SIRS) broadband solar radiation data quality have been developed to aid automated flagging of the SIRS data streams. ...

  13. INEEL/EXT-97-

    Office of Scientific and Technical Information (OSTI)

    ... * The replaceable tightly compressed long-strand cotton fiber bypass oil filter is reputed ... in the Fleet Maintenance Facility. * Pre-mark (or flag) the maintenance record database ...

  14. Microsoft Word - Final formatted Nano-Vol_II-Field_Reports.doc

    Energy Savers [EERE]

    are met. The questionnaire is given to employees annually and when they change jobs. It flags individuals as nanomaterial workers and informs appropriate site personnel...

  15. Fermilab Today

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status Flags at full staff Wilson Hall Cafe Thursday, Feb. 19 - Breakfast: Canadian bacon, egg and cheese Texas toast - Breakfast: all-American breakfast - Chicken cordon bleu...

  16. A Novel Antibody Engineering Platform to Improve Antibody Stability...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A Novel Antibody Engineering Platform to Improve Antibody Stability Argonne National Laboratory Contact ANL About This Technology Fig. 1: Ribbon diagram of a stabilized antibody...

  17. Helping Ensure High-Quality Installation of Solar Power Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technology Maximizes Taxpayer's Investment Mercer Island celebrates the 500th Solarize installation in the state of Washington with a ribbon cutting at the Auto-Spa car wash. ...

  18. Deputy Secretary Poneman's Remarks at the Nuclear Deterrence...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... As you know, we recently announced a Blue Ribbon Commission on America's Nuclear Future, under the distinguished co-chairmanship of Lee Hamilton and Brent Scowcroft, which is ...

  19. EECBG Success Story: Light Shines on Better Budget for Glendale...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency in New Mexico Frees Money in Local Coffers Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the ...

  20. EECBG Success Story: Maine Community Seeing Things in a New Light...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency in New Mexico Frees Money in Local Coffers Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the ...

  1. EECBG Success Story: While Summer Heats Up, Birmingham Community...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Learn more. Addthis Related Articles Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot ...

  2. NE Press Releases | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Blue Ribbon Commission on America's Nuclear Future, co-chaired by former Congressman Lee Hamilton and former National Security Advisor General Brent Scowcroft, will hold its...

  3. 7-27-20100-US_FinTestimony_Kristina_Johnson.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Blue Ribbon Commission on America's Nuclear Future chaired by former Congressman Lee Hamilton and General Brent Scowcroft. The Commission is evaluating options and will...

  4. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    HELIOSPHERE; INTERSTELLAR SPACE; KEV RANGE; MAGNETIC FIELDS; PLASMA; REFLECTION; SUN; SYMMETRY",,"The circular ribbon of enhanced energetic neutral atom (ENA) emission...

  5. TITLE AUTHORS SUBJECT SUBJECT RELATED DESCRIPTION PUBLISHER AVAILABILI...

    Office of Scientific and Technical Information (OSTI)

    DEPENDENCE HELIOSPHERE INTERSTELLAR SPACE KEV RANGE MAGNETIC FIELDS PLASMA REFLECTION SUN SYMMETRY The circular ribbon of enhanced energetic neutral atom ENA emission observed...

  6. Damien LaVera | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Most Recent Solar Manufacturing: To Compete or Not To Compete June 28 Strengthening the Loan Program February 10 The Blue Ribbon Commission Offers Strong Step Forward July 29...

  7. Archives - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community Issues Archives Blue Ribbon Commission Activities Infrastructure Improvements SRSCRO Letter on SRS M&O Contract The Future of SRS: The Community Perspective What's Next...

  8. Giant Protease TPP II's Structure, Mechanism Uncovered

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The protein "skeleton" of this giant protease is depicted in magenta ribbon. The grey enclosure represents a lower-resolution surface and is included to aid visualization of...

  9. News Item

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ribbon orientation and sizes The strong anisotropy was attributed mainly to phonon dispersion with some contribution from phonon-phonon scattering rate, both of which are...

  10. Evergreen Solar Inc | Open Energy Information

    Open Energy Info (EERE)

    Massachusetts Zip: 1752 Product: US manufacturer of multicrystalline silicon wafers, cells, modules and systems; uses a proprietary technology called String Ribbon for wafer...

  11. Sovello AG formerly EverQ GmbH | Open Energy Information

    Open Energy Info (EERE)

    Zip: 6766 Sector: Renewable Energy, Solar Product: JV between Evergreen Solar, Q-Cells and Renewable Energy Corp to develop PV wafers, cells and panels through string ribbon...

  12. Flipping Photoelectron Spins in Topological Insulators

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is an insulator, but electrons (grey spheres) move swiftly on the surface as if through a metal. They are spin polarized, however, with their momenta (directional ribbons) and...

  13. 2:30 PM TODAY: On-the-Record Conference Call with Deputy Assistant...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Africa's energy sector to cut the ribbon at POWER-GEN Africa 2014 in Cape Town, South Africa. | Photo courtesy of the Energy Department. Building Strong, Sustainable Energy ...

  14. Solar Blog | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rep. Pascrell, John Lushetsky and other officials at the ribbon cutting. Largest Solar Panel Installation at a U.S. University Goes Live John Lushetsky, Program Manager of...

  15. Shenmao Technology | Open Energy Information

    Open Energy Info (EERE)

    Shenmao Technology Jump to: navigation, search Name: Shenmao Technology Place: Taoyuan, Taiwan Zip: 328 Product: Maker of solder paste and PV ribbons. Coordinates: 25.001909,...

  16. PREP

    National Nuclear Security Administration (NNSA)

    nnsa.energy.govmediaroompressreleasesprep" target"blank">Pantex Renewable Energy Project (PREP) ribbon-cutting this week. PREP establishes thelargest...

  17. Before House Committee on Science, Space, and Technology

    Broader source: Energy.gov [DOE]

    Subject: Assessing America's Nuclear Future - A review of the Blue Ribbon Commission's Report to the Secretary of Energy By: Peter Lyons

  18. PREP

    National Nuclear Security Administration (NNSA)

    the Pantex Renewable Energy Project (PREP) ribbon-cutting this week. PREP establishes...

  19. Data Room - Facilities - Radiation Effects Facility / Cyclotron...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    types of cables permanently installed. These included: five ribbon cables, two DB9 serial cables, three DB25 serial cables, and two GPIB cables. Permanently installed cables....

  20. Statement from Acting Department of Energy Press Secretary Damien...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acting Department of Energy Press Secretary Damien LaVera on the Blue Ribbon Commission's Interim Recommendations Statement from Acting Department of Energy Press Secretary Damien ...

  1. Secretary Bodman Announces $2 Billion Federal Loan Guarantee...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Secretary Bodman made the announcement in Baltimore while joining Maryland Governor Robert Ehrlich at a ribbon-cutting ceremony opening Maryland's first State-owned E-85 fueling ...

  2. Microsoft Word - AcqGuide70pt52Matrixpart2Redo | Department of Energy

    Energy Savers [EERE]

    70.15 (Septeber 2008) 1 M&O Contractor Incentives - Fee, Rollover of Performance Fee, and Award Term [Reference, DEAR 970.1504-1] Overview This chapter provides: (1) a synopsis of the M&O contractor fee policy (focused on the mechanics of the calculation and the key considerations of the policy); (2) guidance on a key aspect of the policy, linking performance fee to outcomes, including guidelines on allowing rollover of performance fee; and (3) guidance on the use of the non-fee

  3. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Plug-In Electric Vehicle (PEV) Fee All-electric vehicle operators must pay an annual vehicle registration renewal fee of $100. This fee expires if the legislature imposes a vehicle miles traveled fee or tax in the state. Beginning July 1, 2016, this fee is increased to $150. Also beginning July 1, 2016, plug-in hybrid electric vehicles with an all-electric range of at least 30 miles will be subject to the registration renewal fee. (Reference Revised Code of Washington 46.17.323)

  4. The Savannah River site`s groundwater monitoring program: second quarter 1997

    SciTech Connect (OSTI)

    Rogers, C.D.

    1997-11-01

    The Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) administers the Savannah River Site`s (SRS) Groundwater Monitoring Program. During second quarter 1997, EPD/EMS conducted extensive sampling of monitoring wells. A detailed explanation of the flagging criteria is presented in the Flagging Criteria section of this document. Analytical results from second quarter 1997 are included in this report.

  5. Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE Questions concerning this policy flash should...

  6. B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Available Award Fee: B.1 Project Management Incentive Attachment B-2-B 66,545,997 B.2 Cost Incentive Attachment B-2-B 38,022,560 *See Table B-2-B-1 B.3 REA Settlement Fee...

  7. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    owners must pay an annual fee of 140 and hybrid electric vehicle owners must pay an annual fee of 75. (Reference House Bill 312, 2015, and Idaho Statutes 49-402 and 49-457

  8. Fact #790: July 29, 2013 States Beginning to Tax Electric Vehicles...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    North Carolina fees for hybrid-electric vehicles are 50year. Oregon fees apply to any ... News, "States debate taxing green cars to recover lost gas taxes" June 9, 2013. ...

  9. Acquisition Description/ Category Solicitation Method Contract...

    Energy Savers [EERE]

    ... Plus Award Fee 82911-82817 121.1M Moab Remedial Action Contract (Uranium Mill ... Cost Plus Award Fee wFixed Unit Price Component 110411-093016 121M Moab Technical ...

  10. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Energy Savers [EERE]

    Fee Target Fee Maximum Fee Performance Period Fee Available (N/A) Fee Earned FY2002 $15,829 FY2003 $523,056 FY2004 $276,342 FY2005 $941,713 FY2006 $2,856,570 FY2007 $2,972,377 FY2008 $5,223,667 FY2009 $10,018,301 FY2010 $5,696,426 FY2011 $0 FY2012 $0 FY2013 -$20,000,000 FY2014 FY2015 FY2016 Cumulative Fee $8,524,281 Parsons Infrastructure and Technology Group DE-AC09-02SR22210 Fee Information N/A EM Contractor Fee Savannah River Site Office - Aiken, SC Salt Waste Processing Contract December

  11. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    City of Santa Monica- Building Permit Fee Waiver for Solar Projects In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December...

  12. Biomass Producer or Collector Tax Credit

    Broader source: Energy.gov [DOE]

    The Oregon Department of Energy (ODOE) has issued final rules regarding an increase in the application fee for this tax credit. The new fee is $100 plus 3.8 percent of the tax credit amount ...

  13. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    2005 - September 30, 2016 (estimated completion date) Washington Closure LLC DE-AC06-05RL14655 Cost Plus Incentive Fee 2,641,870,419 Fee Information 0 356,652,507 180,983,014...

  14. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    September 2015 Mission Support Alliance, LLC DE-AC06-09RL14728 0 Fee Information Cost Plus Award Fee 3,381,097,250 May 26, 2009 - May 25, 2014 Option 1: 52614 to 52517...

  15. Total Estimated Contract Cost: Contract Option Period: Maximum...

    Office of Environmental Management (EM)

    & Wilcox Conversion Services, LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee EM Contractor Fee September 2015 Site: Portsmouth Paducah Project Office...

  16. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    September 2015 8,207,978 Swift & Staley Mechanical Contractors Inc. DE-AC30-10CC40021 March 16, 2010 - November 30, 2015 Cost Plus Award Fee 137,637,795 Fee Information NA 0...

  17. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    - September 30, 2013 Washington River Protection Solutions LLC DE-AC27-08RV14800 Cost Plus Award Fee 5,553,789,617 Fee Information Option 1: 10113 - 93016 (Exercised)...

  18. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Richland, WA Plateau Remediation Contract September 2015 0 CH2M Hill Plateau Remediation Company DE-AC06-08RL14788 Cost Plus Award Fee 5,468,188,902 228,491,376 Fee Information...

  19. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    2015 October 1, 2012 - September 30, 2017 0 1,332,178,100 Fee Information 43,523,663 Option 1: 10117 - 93022 Cost Plus Award Fee DE-EM0001971 Nuclear Waste Partnership, LLC...

  20. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Project Office Paducah Deactivation Task Order Fluor Federal Services 16,661,745 NA 0 Cost Plus Award Fee and FFP 422,000,000 July 22, 2014 - July 21, 2017 Fee Information...