Sample records for fee adequacy assessment

  1. Nuclear Waste Fund fee adequacy: An assessment

    SciTech Connect (OSTI)

    NONE

    1990-11-01T23:59:59.000Z

    The purpose of this report is to present the Department of Energy`s (the Department) analysis of the adequacy of the 1.00 mill per kilowatt-hour (kWh) fee being paid by the utilities generating nuclear power for the permanent disposal of their spent nuclear fuel (SNF). In accordance with the Nuclear Waste Policy Act (NWPA), the SNF would be disposed of in a geologic repository to be developed by the Department. An annual analysis of the fee`s adequacy is required by the NWPA.

  2. Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of the adequacy of the fee being paid by nuclear power utilities...

  3. Pacific Northwest Power Supply Adequacy Assessment

    E-Print Network [OSTI]

    . Based on an assessment prepared by the Resource Adequacy Forum, the plan noted that relying only that this assessment is not a substitute for a comprehensive resource acquisition plan. The optimal amount and mixPacific Northwest Power Supply Adequacy Assessment for 2017 Final Report November 21, 2012 Council

  4. Pacific Northwest Power Supply Adequacy Assessment

    E-Print Network [OSTI]

    ), the LOLP rises to about 11 percent. The Council's adequacy assessment only counts existing resources and planned resources that are already sited and licensed for operation in the year assessed. There are other years that is not included in this assessment. #12;3 The Resource Adequacy Standard and What it Means

  5. GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions

    Broader source: Energy.gov [DOE]

    Consistent with the Administration's commitment to transparency, DOE General Counsel Scott Blake Harris has decided that all future determinations as to the adequacy of the Nuclear Waste Fund fee...

  6. Assessment of the Adequacy of Natural Gas Pipeline Capacity in...

    Office of Environmental Management (EM)

    Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States - November 2013 Assessment of the Adequacy of Natural Gas Pipeline Capacity in the...

  7. "Assessment of the Adequacy of Natural Gas Pipeline Capacity...

    Broader source: Energy.gov (indexed) [DOE]

    its "Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States" report. The report is now available for downloading. In 2005-06, the Office of...

  8. Solid Waste Assessment Fee Exemptions (West Virginia)

    Broader source: Energy.gov [DOE]

    A person who owns, operates, or leases an approved solid waste disposal facility is exempt from the payment of solid waste assessment fees, upon the receipt of a Certificate of Exemption from the...

  9. STUDENT SERVICES FEE ASSESSMENT REQUEST To elect to pay the Student Services Fee, fill out the form completely and return

    E-Print Network [OSTI]

    Amin, S. Massoud

    Health Benefit Plan. Contact Boynton Health Services at 612-625-8400 for further information. ProgramsSTUDENT SERVICES FEE ASSESSMENT REQUEST DIRECTIONS To elect to pay the Student Services Fee, fill the Student Services Fee, you may elect to pay the fee to use or support the services covered by the fee. You

  10. Fees

    Broader source: Energy.gov [DOE]

    The DOE Loan Program is required to collect several fees from loan program Applicants. Please find an outline of these fees below. In addition, DOE is supported by outside consultants and legal...

  11. January 16, 2013 Secretarial Determination of the Adequacy of...

    Broader source: Energy.gov (indexed) [DOE]

    As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its review of the adequacy of the Nuclear Waste Fund fee. Based on that review, the Secretary has...

  12. An assessment of the quality and educational adequacy of educational facilities and their perceived impact on the learning environment as reported by middle school administrators and teachers in Humble Independent School District, Humble, Texas

    E-Print Network [OSTI]

    Monk, Douglas Matthew

    2007-04-25T23:59:59.000Z

    an assessment of the impact that these facilities have on the learning environment. This study also assesses the quality and adequacy of these middle school facilities through a purely quantitative evaluation conducted by an unbiased assessment team. Humble ISD...

  13. An assessment of the quality and educational adequacy of educational facilities and their perceived impact on the learning environment as reported by middle school administrators and teachers in Humble Independent School District, Humble, Texas

    E-Print Network [OSTI]

    Monk, Douglas Matthew

    2007-04-25T23:59:59.000Z

    an assessment of the impact that these facilities have on the learning environment. This study also assesses the quality and adequacy of these middle school facilities through a purely quantitative evaluation conducted by an unbiased assessment team. Humble ISD...

  14. Resource Adequacy Standard for the Pacific Northwest

    E-Print Network [OSTI]

    , recommended by the Resource Adequacy Forum, to assess the adequacy of the Northwest's power supply. The purpose of this assessment is to provide an early warning should resource development fail to keep pace resources are assumed for the assessment. Council staff will collect and maintain resource data, which also

  15. Structural aging program to assess the adequacy of critical concrete components in nuclear power plants

    SciTech Connect (OSTI)

    Naus, D.J.; Marchbanks, M.F.; Oland, C.B.; Arndt, E.G.

    1989-01-01T23:59:59.000Z

    The Structural Aging (SAG) Program is carried out by the Oak Ridge National Laboratory (ORNL) under sponsorship of the United States Nuclear Regulatory Commission (USNRC). The Program has evolved from preliminary studies conducted to evaluate the long-term environmental challenges to light-water reactor safety-related concrete civil structures. An important conclusion of these studies was that a damage methodology, which can provide a quantitative measure of a concrete structure's durability with respect to potential future requirements, needs to be developed. Under the SAG Program, this issue is being addressed through: establishment of a structural materials information center, evaluation of structural component assessment and repair technologies, and development of a quantitative methodology for structural aging determinations. Progress to date of each of these activities is presented as well as future plans. 7 refs., 5 figs.

  16. Mandatory Student Fees FY 2014 2015

    E-Print Network [OSTI]

    Maccabe, Barney

    Mandatory Student Fees FY 2014 ­ 2015 Mandatory Student Fees, as prescribed in UNM Policy 1310 to assess. The Board of Regents approves the final amount. Below is the annual budget detailing how these fees will be allocated. April 21, 2014 Budget (in dollars) STUDENT ACTIVITY FEES (assessed to all

  17. Comparing Resource Adequacy Metrics: Preprint

    SciTech Connect (OSTI)

    Ibanez, E.; Milligan, M.

    2014-09-01T23:59:59.000Z

    As the penetration of variable generation (wind and solar) increases around the world, there is an accompanying growing interest and importance in accurately assessing the contribution that these resources can make toward planning reserve. This contribution, also known as the capacity credit or capacity value of the resource, is best quantified by using a probabilistic measure of overall resource adequacy. In recognizing the variable nature of these renewable resources, there has been interest in exploring the use of reliability metrics other than loss of load expectation. In this paper, we undertake some comparisons using data from the Western Electricity Coordinating Council in the western United States.

  18. Resource Adequacy Advisory Committeey

    E-Print Network [OSTI]

    ) Total Resources Reported Net Gas-Fired Plants (2017) Import Assumption* "Surplus" Average Min B=D*1 in winter loads (summer didn't matter because we assumed no marketmatter because we assumed no market Report (April 2011) S. to N. Transfer (AC + DC) A B C D E F G 2010 Demand 1:2 Adequacy Requirement (AR

  19. Document 2006-17 September 19, 2006 Pacific Northwest Resource Adequacy Implementation Plan

    E-Print Network [OSTI]

    Coordinating Council (WECC) is developing guidelines to recommend appropriate methodologies for assessing resource adequacy. Although the NERC and WECC efforts act as drivers, momentum is also building within

  20. Document 2006-22 November 15, 2006 Pacific Northwest Resource Adequacy Warning Implementation Plan

    E-Print Network [OSTI]

    Coordinating Council (WECC) is developing guidelines to recommend appropriate methodologies for assessing resource adequacy. Although the NERC and WECC efforts act as drivers, momentum is also building within

  1. FY 2007 Fee Adequacy, Pub 2008 | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAMDepartmentofof EnergyOverview46 Report toFY

  2. DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of...

  3. Dissertation Submission Fee Chart (Fees effective 29 August 2011)

    E-Print Network [OSTI]

    Singh, Jaswinder Pal

    Dissertation Submission Fee Chart (Fees effective 29 August 2011) The fees that students dissertation maintenance fee to the Mudd Manuscript Library. Fees submitted online in the UMI ETDCard or American Express*. The $15 dissertation maintenance fee is paid at the Mudd Manuscript Library

  4. Student services fee The student services fee is distributed

    E-Print Network [OSTI]

    Amin, S. Massoud

    to services covered by the fee (health plan excluded). Regents Scholarship recipients and Senior CitizenStudent services fee The student services fee is distributed among various student programs/tuition_and_fees/student_ser- vice_fees.html). If you are enrolled for 6 or more credits, you must pay a student services fee of $368

  5. Resource Adequacy Forum Technical Committee

    E-Print Network [OSTI]

    Assessment's treatment of natural gas fired combustion turbines align with the owner/operator's expectation annual energy ­ actual project output provided by owner/operator. #12;Natural Gas Combustion Turbines 300 350 400 450 Natural Gas Combustion Turbines Planning Actual Genesis 4/6/2011 50 100 #12;

  6. R AdResource Adequacy Advisory CommitteeAdvisory Committee

    E-Print Network [OSTI]

    Committee Meeting November 20, 2013 #12;General Topic OutlineGeneral Topic Outline Scope and Role: Power Division Director Committee co-chairs: Council and BPA MembersMembers Utilities, commissionsNERC Definition of Adequacy Adequacy is the ability of the electricAdequacy is the ability of the electric system

  7. Miscellaneous Fees Associate Student

    E-Print Network [OSTI]

    Levi, Ran

    ). [Fees for the supervised MD and ChM will be at the standard part-time postgraduate rate] £900 Re

  8. MINNESOTA ROAD FEE TEST MILEAGE BASED USER FEE RATE

    E-Print Network [OSTI]

    Minnesota, University of

    Policy Center Oregon Road User Fee Pilot Program Other Interest: Nevada, Texas, Ohio, Idaho, etc. May Cellular Tower Data Warehouse May 24, 2012 6 #12;Determination of Mileage Fees · MBUF Rate StructureMINNESOTA ROAD FEE TEST MILEAGE BASED USER FEE RATE STRUCTURE CONCEPT 23rd Annual Transportation

  9. California Energy Commission EFSD Rev 3/07 1 Data Adequacy Worksheets Adequacy Issue: Adequate Inadequate DATA ADEQUACY WORKSHEET Revision No. 0 Date

    E-Print Network [OSTI]

    California Energy Commission EFSD Rev 3/07 1 Data Adequacy Worksheets Adequacy Issue: Adequate of the cooling system, the estimated cooling tower drift rate, the rate of water flow through the cooling tower pollutants and greenhouse gases (CO2, CH4, N2O, and SF6) from the stack, cooling towers, fuels and materials

  10. AWARD FEE PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AWARD FEE PLAN FOR LAT A Environmental Services of Kentucky, LLC Paducah Remediation Contract DE-AC30-10CC40020 CONCUR: Rob Seifert, Paducah Re e iation Engineer and Deputy...

  11. Fee Title: Renewable Energy Fee Measure #: Measure 44

    E-Print Network [OSTI]

    California at Santa Cruz, University of

    Fee Title: Renewable Energy Fee Measure #: Measure 44 Ballot Information Shall the undergraduates and graduate students of UCSC amend Measure 28, the Renewable Energy fee passed in Spring 2006 as follows: The amendment would allow funds to be used for on-site renewables and energy efficiency projects

  12. Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    Fee Paid 1,514,656 Portage, Inc. DE-DT0002936 EM Contractor Fee Site: MOAB Uranium Mill Tailings - MOAB, UT Contract Name: MOAB Uranium Mill Tailings Remedial Action Contract...

  13. Undergraduate study Annual tuition fees

    E-Print Network [OSTI]

    Glasgow, University of

    's fees for undergraduate study. All fees are in £ sterling and may be subject to revision. For more programmes*** £13,000 Science, Engineering, Nursing and College of Medical, Veterinary and Life Sciences

  14. Security-Constrained Adequacy Evaluation of Bulk Power System Reliability

    E-Print Network [OSTI]

    Security-Constrained Adequacy Evaluation of Bulk Power System Reliability Fang Yang, Student Member. Stefopoulos, Student Member, IEEE Abstract -- A framework of security-constrained adequacy evaluation (SCAE electric load while satisfying security constraints. It encompasses three main steps: (a) critical

  15. TRANSPORTATION SERVICES VEHICLE RENTAL FEES

    E-Print Network [OSTI]

    ENVIRONMENT FEES AIR CONDITIONER SERVICE $75.00 PARTS + 10% BATTERY CHARGE $25.00 BATTERY REPLACEMENT $25

  16. Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOriginEducationVideo »Usage »DownloadSolar »MiddleHighHighEnergyor Transfer ofDepartment of

  17. Fiscal year 1999 Battelle performance evaluation and fee agreement

    SciTech Connect (OSTI)

    DAVIS, T.L.

    1998-10-22T23:59:59.000Z

    Fiscal Year 1999 represents the third fill year utilizing a results-oriented, performance-based evaluation for the Contractor's operations and management of the DOE Pacific Northwest National Laboratory (here after referred to as the Laboratory). However, this is the first year that the Contractor's fee is totally performance-based utilizing the same Critical Outcomes. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractor's performance for the period October 1, 1998 through September 30, 1999, as required by Clauses entitled ''Use of Objective Standards of Performance, Self Assessment and Performance Evaluation'' and ''Performance Measures Review'' of the Contract DE-ACO6-76RL01830. Furthermore, it documents the distribution of the total available performance-based fee and the methodology set for determining the amount of fee earned by the Contractor as stipulated within the causes entitled ''Estimated Cost and Annual Fee,'' ''Total Available Fee'' and ''Allowable Costs and Fee.'' In partnership with the Contractor and other key customers, the Department of Energy (DOE) Headquarters (HQ) and Richland Operations Office (RL) has defined four critical outcomes that serve as the core for the Contractor's performance-based evaluation and fee determination. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory.

  18. What are tuition fees for? Studying at a UK University means that you need to pay an annual fee for your

    E-Print Network [OSTI]

    Diggle, Peter J.

    ,500 19,500 Business Administration MBA 26,000 26,000 N/A N/A Business Management with Energy and Fuels for your tuition, which covers the costs associated with teaching, examinations, assessment and graduation fee is for the cost of the programme, not the fee per annum. How does Lancaster set overseas tuition

  19. The University of North Carolina at Chapel Hill Student Fees

    E-Print Network [OSTI]

    Crews, Stephen

    Operating Expenses CHILD CARE SERVICES FEE h. Child Care Services RENEWABLE ENERGY FEE i. Renewable Energy

  20. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    LLC (UCOR) DE-SC-0004645 April 29, 2011 - July 13, 2016 Contract Number: Maximum Fee Cost Plus Award Fee 1,640,839,964 Fee Information Minimum Fee 0 EM Contractor Fee Site:...

  1. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    FY2011 FY2012 Fee Information Minimum Fee Maximum Fee September 2014 Contract Number: Cost Plus Incentive Fee Contractor: 3,260,603,765 Contract Period: EM Contractor Fee Site:...

  2. OCEAN SCIENCES CENTRE USER FEE DOCUMENT

    E-Print Network [OSTI]

    Oyet, Alwell

    ............................................................................................................ 4 2.2 Storage Fees.6 Cold Rooms support research programs of our Government and Industrial Partners The following user fee schedules

  3. Tuitioon & Fees Broc Bowling Gree

    E-Print Network [OSTI]

    Moore, Paul A.

    the outofstate surcharge. Tuition Rates by Campus Bowling Green State University offers programs from three 1001 Ea 132 Admin Bowling G 419 Bursa en State Unive ast Wooster S nistration Bui Green, OH. 4 bursar without advanced notice. Fees/Policies All tuition and fees are approved by Bowling Green State

  4. CRAD, Assessment Criteria and Guidelines for Determining the Adequacy of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube platformBuilding Removal OngoingCERCLA(Expenditure-Based)Services »

  5. PNW Coal Closure Study Resource Adequacy Advisory Committee

    E-Print Network [OSTI]

    PNW Coal Closure Study 1 y Resource Adequacy Advisory Committee Steering Committee Meeting outage calculations)100 MW (for forced outage calculations) #12;Coal Replacement Plans 4 Coal Replacement Plans Boardman 601 MW The 2016 PGE IRP process will include the Boardman coal plant replacement

  6. The North Carolina Solar Center offers free and fee-based technical services for manufacturers and other

    E-Print Network [OSTI]

    The North Carolina Solar Center offers free and fee- based technical services for manufacturers Training. Renewable Energy Assessments The Solar Center's renewable energy assessments focus on practical ways companies can incorporate renewable energy into their facilities and existing energy systems

  7. Sandia National Laboratories: User Fees for NSTTF Capabilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FacilityUser Fees for NSTTF Capabilities User Fees for NSTTF Capabilities NSTTFpricing A site access fee is charged for all projects. The fee includes such things as office space,...

  8. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    Office - Oak Ridge, TN Contract Name: Transuranic Waste Processing Contract Sep-14 2,433,940 Cost Plus Award Fee 150,664,017 Fee Information Minimum Fee 2,039,246 Maximum Fee...

  9. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    Number: Contract Type: Contract Period: 0 Minimum Fee Maximum Fee Washington River Protection Solutions LLC DE-AC27-08RV14800 Cost Plus Award Fee 5,553,789,617 Fee Information...

  10. CRAD, Assessment Criteria and Guidelines for Determining the...

    Office of Environmental Management (EM)

    Criteria and Guidelines for Determining the Adequacy of Software Used in the Safety Analysis and Design of Defense Nuclear Facilities CRAD, Assessment Criteria and Guidelines for...

  11. CONCUR: AWARD FEE PLAN - FY15

    Office of Environmental Management (EM)

    (i) TABLE OF CONTENTS PAGE 1. INTRODUCTION 1 2. DEFINITION OF TERMS 1 3. ORGANIZATIONAL STRUCTURE 2 4. RESPONSIBILITIES 3 5. AWARD FEE AMOUNTS AND PERIODS 4 6. AWARD FEE...

  12. Regional Assessment and Resource Centre (RARC) and Mobile Assessment Team (MAT), Queen's University, Mackintosh-Corry Hall, Room B100, 68 University Ave., Kingston, ON K7L 3N6

    E-Print Network [OSTI]

    Ellis, Randy

    Regional Assessment and Resource Centre (RARC) and Mobile Assessment Team (MAT), Queen's University will receive an e-mail confirming the fee. #12;Regional Assessment and Resource Centre (RARC) and Mobile Fee Information Sheet and Financial Contract Fee Information: · Psychoeducational assessments

  13. Tuitioon & Fees Broc Bowling Gree

    E-Print Network [OSTI]

    Moore, Paul A.

    are approved by Bowling Green State University's Board of Trustees and are subject to change, without notice the instructional fee plus the outofstate surcharge. Tuition Rates by Campus Bowling Green State University the Bowling Gree 1001 Ea 132 Admin Bowling 419 Bursa en State Unive ast Wooster S nistration Bui Green, OH 4

  14. Undergraduate study Annual tuition fees

    E-Print Network [OSTI]

    Glasgow, University of

    , Veterinary and Life Sciences programmes 17,250 MBChB, BDS and College of Medical, Veterinary and Life Sciences clinical programmes 31,250 Any exceptions to these fees appear on the following page. Students 910 110 credits 1,668 70 credits 1,062 119 credits** 1,805 *Minimum fundable credits by SAAS

  15. Total Estimated Contract Cost:) Performance Period Total Fee...

    Office of Environmental Management (EM)

    Washington Closure LLC DE-AC06-05RL14655 Contractor: Contract Number: Contract Type: Cost Plus Incentive Fee 2,366,753,325 Fee Information 0 Maximum Fee 319,511,699...

  16. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    0 Contractor: Bechtel National Inc. Contract Number: DE-AC27-01RV14136 Contract Type: Cost Plus Award Fee Maximum Fee* 595,123,540 Fee Available 102,622,325 10,714,819,974...

  17. UC Davis Student Services Fee (excludes Mental Health funds) Student Services and Fees Administrative Advisory Committee

    E-Print Network [OSTI]

    Pasternack, Gregory B.

    UC Davis Student Services Fee (excludes Mental Health funds) Student Services and Fees Management Capital Projects 2 943,666.00$ (2,807.79)$ (946,473.79)$ -$ Child Care 45,325.16$ 144,957.08$ 99 and Institutional Analysis #12;UC Davis Student Services Fee (excludes Mental Health funds) Student Services

  18. Queens College Student Technology Fee Plan A Summary of the Plans for Student Technology Fee

    E-Print Network [OSTI]

    Johnson Jr.,, Ray

    ;Student Technology Fee Plan College: Queens College Recurring Cost: Instructional Resources MaintenanceQueens College Student Technology Fee Plan A Summary of the Plans for Student Technology Fee 2009-2010 Prepared by the Queens College Office of the Provost and Queens College Office of Converging Technologies

  19. AWARD FEE DETERMINATION SCORECARD Contractor: Restoration Services...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    fee available or available amount of 52,456.20). o Adjective Rating: Very Good - Total of 44,762 earned. - Quality and Effectiveness of Performing Environment, Safety &...

  20. Review of Regional Load and Resource Information A Report to Resource Adequacy Steering Committee

    E-Print Network [OSTI]

    of the information, it may also lead to further exploration of the data and the approach. This report summarizesReview of Regional Load and Resource Information A Report to Resource Adequacy Steering Committee the results of our review of the load and resource information embodied in the 2010 Resource Adequacy

  1. AWARD FEE DETERMINATION SCORECARD Contractor: Fluor B&W Portsmouth...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ranges Category of Performance Percentage Determination Award Fee Determination 1. Quality and Effectiveness in performing the DOE mission (17.5% of total subjective fee or...

  2. Policy Flash 2013-24 Fee Determinations: Requirement to Obtain...

    Office of Environmental Management (EM)

    Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's...

  3. FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor...

    Office of Environmental Management (EM)

    project estimating. Performance Based Incentives Award Fee Performance Based Incentive Formula: 60% of total available fee (665,781 available). Base Performance Based Incentive...

  4. Water pollution Control Permit Fee Schedules (West Virginia)

    Broader source: Energy.gov [DOE]

    This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national pollutant discharge elimination system permits issued by the...

  5. NOTES FOR TUITION AND FEES 2012-2013 Rates include mandatory fees. Students taking all of their courses at off-campus locations (including distance

    E-Print Network [OSTI]

    MacAdam, Keith

    approved by the College of Medicine Student Progress and Promotion Committee to take a reduced curriculum hours) will be assessed on a per-credit hour basis. AnnualFull-TimeFee The annual rates for Medicine-13 totaling $1,241. College of Medicine (Annual Charges) Beginning with Fall 2007, the College of Medicine

  6. Property Tax Fee-In-Lieu (Mississippi)

    Broader source: Energy.gov [DOE]

    The Property Tax Fee-In-Lieu allows for new or expansion projects in the state that have a private capital investment in excess of $100,000,000, a negotiated fee can be set that is paid in place of...

  7. FOIA FEES | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sure you want toworldPowerHome |CookingFAQs FAQs Topics: ShuttleFEES FOIA

  8. Annual summary of ILAW performance assessment for 2002

    SciTech Connect (OSTI)

    MANN, F M

    2002-11-01T23:59:59.000Z

    An annual summary of the adequacy of the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (ILAW PA) is necessary in each year in which a full performance assessment is not issued.

  9. 3-Methylhistidine excretion as an index of dietary protein adequacy in the rat

    E-Print Network [OSTI]

    Kirby, Rebecca Kay

    1980-01-01T23:59:59.000Z

    3-METHYLHISTIDINE EXCRETION AS AN INDEX OF DIETARY PROTEIiV ADEQUACY IN THE RAT A Thesis by REBECCA KAY KIRBY Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirement for the degree of MASTER... OF SCIENCE August 1980 Major Subject: Biochemistry and Biophysics 3-METHYLHISTIDINE EXCRETION AS AN INDEX OF DIETARY PROTEIN ADEQUACY IN THE RAT A Thesis by REBECCA KAY KIRBY Approved as to style and content by: (Chairman of Committee) (Member...

  10. fees

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 Russian Nuclear Warheads|ofEventsWorkshopY-12a Multi-UsercrdfLASH 2011-66

  11. Arbitration Costs and Contingent Fee Contracts

    E-Print Network [OSTI]

    Drahozal, Christopher R.

    2005-08-03T23:59:59.000Z

    A common criticism of arbitration is that its upfront costs (arbitrators' fees and administrative costs) may preclude consumers and employees from asserting their claims. Some commentators have argued further that arbitration costs undercut...

  12. Underground Injection Control Fee Schedule (West Virginia)

    Broader source: Energy.gov [DOE]

    This rule establishes schedules of permit fees for state under?ground injection control permits issued by the Chief of the Office of Water Resources. This rule applies to any person who is...

  13. Sacramento Ordinance to Waive Solar PV Fees

    Broader source: Energy.gov [DOE]

    This is an ordinance by the city of Sacramento to suspend for the calendar years 2007-2009 all fees related to installation of photovoltaic systems on existing residences.

  14. Plant Diagnostic Clinic Services Offered & Fees

    E-Print Network [OSTI]

    Plant Diagnostic Clinic Services Offered & Fees Make the Most of a Beneficial Facility Visual without notice. Location Jefferson County Plant Diagnostic Clinic 15200 West 6th Avenue, Unit C Golden, CO

  15. City of Asheville- Building Permit Fee Waiver

    Broader source: Energy.gov [DOE]

    The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings....

  16. OMB Control # 0648-0376 Expires 2/29/2012 Fee Collector's Name

    E-Print Network [OSTI]

    OMB Control # 0648-0376 Expires 2/29/2012 Fee Collector's Name Mailing Address City State Zip Phone BBGS-001WS 1.50 Total Fees ($) Fee Adjustment Instructions: 1. Complete the fee collector's name

  17. A computerized student fee system for Texas A&M University

    E-Print Network [OSTI]

    Wood, Lester Seth

    1972-01-01T23:59:59.000Z

    accounts for each student who has a scholarshi. p or contract. The fee summary card is used by the fee update program for recording the payment of fees or for revising a student's fee statement. ~0 eratin~ Procedures (l) Verify all fee rates contained... at A&ld which includes procedures for the collection and recording of student fee data, the calculation of student fees and t' he preparation of fee statements, the updating of student fees and the revision of fee statements, the distribution of fees...

  18. The Adequacy of DOE Natural Phenomena Hazards Performance Goals...

    Office of Environmental Management (EM)

    Assess whether the DOE NPH performance goal concept as used in the Documented Safety Analysis process is adequate or needs additional guidance Background * ANS Standard...

  19. Does Abolishing Fees Reduce School Quality? Evidence from Kenya

    E-Print Network [OSTI]

    Oxford, University of

    Does Abolishing Fees Reduce School Quality? Evidence from Kenya Tessa Bold, Mwangi Kimenyi, Germano Mwabu and Justin Sandefur This Version: December 30, 2010 Abstract In 2003 Kenya abolished user fees

  20. DATA TRANSMISSION OPTIONS FOR VMT DATA AND FEE COLLECTION CENTERS

    E-Print Network [OSTI]

    Bertini, Robert L.

    , VMT fee, data processing, fuel tax alternatives, fee collection center, customer service center 18.59 kilometers squared km2 VOLUME VOLUME mL milliliters 0.034 fluid ounces fl oz fl oz fluid ounces 29

  1. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    Wastren-EnergX Mission Support LLC Contract Number: DE-CI0000004 Contract Type: Cost Plus Award Fee 128,879,762 Contract Period: December 2009 - July 2015 Fee Information...

  2. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    - September 2015 September 2014 Contractor: Contract Number: Contract Type: Idaho Treatment Group LLC DE-EM0001467 Cost Plus Award Fee Fee Information 444,161,295 Contract Period:...

  3. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    Cumulative Fee Paid 22,200,285 Wackenhut Services, Inc. DE-AC30-10CC60025 Contractor: Cost Plus Award Fee 989,000,000 Contract Period: Contract Type: January 2010 - December...

  4. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    & Wilcox Conversion Services, LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee Fee Available 4,324,912 408,822,369 Contract Period: December 2010 -...

  5. Permit Fees for Hazardous Waste Material Management (Connecticut)

    Broader source: Energy.gov [DOE]

    These regulations describe applicable fees for permit application, modification, and transfer for permits related to hazardous waste management.

  6. Subject: Fee Payment and Open Enrollment Hello from Queen's!

    E-Print Network [OSTI]

    Ellis, Randy

    of paying your fees by monthly deductions via a payment plan (PPL). The School of Graduate Studies, Graduate

  7. West Virginia University 1 Tuition, Fees and Residency

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    West Virginia University 1 Tuition, Fees and Residency Page Contents: · Residency Policy · Fee of adoption. Section 2: Classification for Admission and Fee Purposes 1. Students enrolling in a West Virginia status to another public institution in West Virginia. Section 3: Residence Determined by Domicile 1

  8. UCF TECHNOLOGY FEE GUIDELINES Academic Year 2013-2014

    E-Print Network [OSTI]

    Foroosh, Hassan

    UCF TECHNOLOGY FEE GUIDELINES Academic Year 2013-2014 The 2007 Florida Legislature amended Florida Statutes, Section 1009.24, to establish "a technology fee of up to 5 percent of the tuition per credit hour to enhance instructional technology resources for students and faculty." UCF TECHNOLOGY FEE COMMITTEE Revenue

  9. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    Fee Paid 127,390,991 Contract Number: Fee Available Contract Period: Contract Type: Cost Plus Award Fee 4,104,318,749 28,500,000 31,597,837 0 39,171,018 32,871,600 EM...

  10. Comparing Resource Adequacy Metrics and Their Influence on Capacity Value: Preprint

    SciTech Connect (OSTI)

    Ibanez, E.; Milligan, M.

    2014-04-01T23:59:59.000Z

    Traditional probabilistic methods have been used to evaluate resource adequacy. The increasing presence of variable renewable generation in power systems presents a challenge to these methods because, unlike thermal units, variable renewable generation levels change over time because they are driven by meteorological events. Thus, capacity value calculations for these resources are often performed to simple rules of thumb. This paper follows the recommendations of the North American Electric Reliability Corporation?s Integration of Variable Generation Task Force to include variable generation in the calculation of resource adequacy and compares different reliability metrics. Examples are provided using the Western Interconnection footprint under different variable generation penetrations.

  11. The Exposure-Response Curve for Ozone and Risk of Mortality and the Adequacy of Current Ozone

    E-Print Network [OSTI]

    Dominici, Francesca

    The Exposure-Response Curve for Ozone and Risk of Mortality and the Adequacy of Current Ozone for Ozone and Risk of Mortality and the Adequacy of Current Ozone Regulations Michelle L. Bell,1 Roger D.432.3817 E-mail: michelle.bell@yale.edu 1 #12;Running Title: Ozone and mortality: exposure

  12. Sixth Northwest Conservation & Electric Power Plan Flexibility Adequacy

    E-Print Network [OSTI]

    load - curtail wind until loads build up Unforecasted downramp during peak load - dispatch reserve uncertainties Extrapolating from BA-scale integration assessments to regional scale Wind development for flexibility is unevenly allocated among BAs Bonneville, NWE Bonneville pressed because: Scale of penetration

  13. The MVR fee for all other states, US territories and provinces is as follows: State/Province Fee (USD) State/Province Fee (USD)

    E-Print Network [OSTI]

    Kirschner, Denise

    The MVR fee for all other states, US territories and provinces is as follows: State/Province Fee (USD) State/Province Fee (USD) Alabama $11.25 North Carolina $11.50 Alaska $8.50 North Dakota.50 Georgia $11.50 Tennessee $10.50 Hawaii $26.50 Texas $10.00 Idaho $12.50 Utah $12.50 Illinois

  14. TPWRS-00322-2007.R2 1 Short-Term Resource Adequacy in

    E-Print Network [OSTI]

    Gross, George

    of the system to meet the aggregate customer demand with the appropriate quality [1]. Resource adequacy and the demand bids of price-responsive buyers. The regulatory framework of the vertically integrated utility in terms of a price-sensitive demand curve. The program gives incentives for providing capacity to markets

  15. Assuring Generation Adequacy through Call Option Obligations Shmuel S. Oren, Fellow IEEE

    E-Print Network [OSTI]

    Oren, Shmuel S.

    Assuring Generation Adequacy through Call Option Obligations Shmuel S. Oren, Fellow IEEE University-utility generators to bear investment and operating risks, and by requiring retailers and/or their customers to bear energy market, generators always offer supply at marginal cost but inframarginal profits (from scarcity

  16. West Virginia University 1 Tuition, Fees & Residency

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    Year's Work The WVU Financial Aid Office provides an estimate of the total cost of attendance for an academic year at financialaid.wvu.edu/tuition-cost-information/ cost-of-attendance. This estimate includesWest Virginia University 1 Tuition, Fees & Residency In this section: Cost: Cost of an Academic

  17. Avoided Gigawatts Through Utility Capital Recovery Fees

    E-Print Network [OSTI]

    Frosenfeld, A. N.; Verdict, M. E.

    1985-01-01T23:59:59.000Z

    structure is possible through the use of capital recovery fees for new electric meter hookups similar to those commonly used for new water and wastewater hookups where the developer/owner is required to capitalize the marginal cost of new demand. By giving...

  18. Annual summary of Immobilized Low-Activity Waste (ILAW) Performance Assessment for 2003 Incorporating the Integrated Disposal Facility Concept

    SciTech Connect (OSTI)

    MANN, F M

    2003-09-01T23:59:59.000Z

    To Erik Olds 09/30/03 - An annual summary of the adequacy of the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (ILAW PA) is necessary in each year in which a full performance assessment is not issued.

  19. OMB Control # 0648-0376 Expires 2/29/2012 Fee Collector's Name

    E-Print Network [OSTI]

    OMB Control # 0648-0376 Expires 2/29/2012 Fee Collector's Name Mailing Address City State Zip Phone Number Fee Collector's Permit or Buyer Code Settlement Sheet Date Month and Year of Landings Contact the fee collector's name, address, telephone number, fee collector's permit number, date of this fee

  20. Collected LWA Engineering Memos from the Development of the Front End Electronics (FEE)

    E-Print Network [OSTI]

    Ellingson, Steven W.

    , LWA FEE Version 1.7, 2009 March 17 · FEE0023: Brian Hicks, Jacob Hartman, and Norman McGlothlin, Long and Bill of Materials, 2009 July 2 · FEE0024: Jacob Hartman and Brian Hicks, FEE0024: Linearity boards in the FEE subsystem never be required to bear any mechanical load. The unexpected failure

  1. Boise State University 2013-2014 Graduate Catalog 45 Tuition and Fees

    E-Print Network [OSTI]

    Barrash, Warren

    questions about Idaho residency requirements. Deadlines for Paying Tuition, Fees, and Other Charges YouBoise State University 2013-2014 Graduate Catalog 45 Tuition and Fees In general, the costs of attending Boise State University arise from tuition, institutional fees, and special fees (such as fees

  2. OLD DOMINION UNIVERSITY DENTAL HYGIENE CARE FACILITY 2011-2012 Fees

    E-Print Network [OSTI]

    OLD DOMINION UNIVERSITY DENTAL HYGIENE CARE FACILITY 2011-2012 Fees CLINIC FEES 1. Dental Hygiene of treatment, a new fee will be charged and the appointment will be treated as a re-care. Dental Hygiene

  3. Wealth Inequality in the Land of the Fee: A Conversation with Devin Fergus

    E-Print Network [OSTI]

    Reid, Carolina

    2013-01-01T23:59:59.000Z

    Research Center. Wealth Inequality in the Land of the FeeWealth Inequality in the Land of the Fee: A Conversationand Osoro 2013). Wealth Inequality in the Land of the Fee

  4. Green fees: Getting paid for getting it right -- Performance based fee contracts for new construction

    SciTech Connect (OSTI)

    Hubbard, G. [Rocky Mountain Inst., Snowmass, CO (United States). Green Development Services; Eley, C. [Eley Associates, San Francisco, CA (United States)

    1997-12-31T23:59:59.000Z

    Energy-efficient design in buildings today is too often the exception, rather than the rule. Building to code is not enough. That only means if the building was any worse, it would be illegal. The designers of exceptional buildings are showing that integrated design--architects, engineers, clients, and, ideally, contractors working closely together from the start--creates high performance buildings without additional capital cost, just increased design time. Agreement throughout the design profession shows that high performance buildings would be more prevalent if there were incentives to put the extra time into design integration. Rocky Mountain Institute (RMI) and Eley Associates are working to create Performance Based Fee contracts to demonstrate design incentive fees that can help architects, engineers, and building owners create extremely energy-efficient buildings. These fees will reward design professionals for what they save, not just for what they spend--thus aligning designers` interests with owners.

  5. FY 12 Award Fee Determination Scorecard Contractor: LATA Environmenta...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Effective of ESH&QA: Excellent Quality and Effective of Project Support: Very Good Quality and Effectiveness of Project Management: Good Base Fee Available: 40% of total...

  6. FY 13 Award Fee Determination Scorecard Contractor: LATA Environmenta...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Effective of ESH&QA: Excellent Quality and Effective of Project Support: Excellent Quality and Effectiveness of Project Management: Very Good Base Fee Available: 40% of...

  7. Sacramento Ordinance to Waive Fees for Solar Hot Water

    Broader source: Energy.gov [DOE]

    An ordinance suspending for the calendar years 2007-2009 all fees related to installations of solar water heaters on existing residences.

  8. Fees For Disposal Of Hazardous Waste Or Substances (Alabama)

    Broader source: Energy.gov [DOE]

    The article lists annual payments to be made to counties, restrictions on disposal of hazardous waste, additional fees collected by counties and penalties.

  9. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    Services & Testing Contract September 2014 Contractor: Contract Number: Contract Type: Advanced Technologies & Labs International Inc. DE-AC27-10RV15051 Cost Plus Award Fee...

  10. Gordon Fee, part 1 | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Gordon Fee, part 1 Oral History Videos Speakers INTRODUCTION Ed Bailey Jim Bailey Kay Bailey Ken Bernander Willard Brock Wilma Brooks Elmer Brummitt Naomi Brummitt Blake Case...

  11. Gordon Fee, part 2 | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Gordon Fee, part 2 Oral History Videos Speakers INTRODUCTION Ed Bailey Jim Bailey Kay Bailey Ken Bernander Willard Brock Wilma Brooks Elmer Brummitt Naomi Brummitt Blake Case...

  12. The convergence of market designs for adequate generating capacity with special attention to the CAISO's resource adequacy problem

    E-Print Network [OSTI]

    Cramton, Peter C.

    2006-01-01T23:59:59.000Z

    This paper compares market designs intended to solve the resource adequacy (RA) problem, and finds that, in spite of rivalrous claims, the most advanced designs have nearly converged. The original dichotomy between approaches ...

  13. Evaluation of the adequacy of the 2000P test vehicle as a surrogate for light truck subclasses

    E-Print Network [OSTI]

    Titus-Glover, Cyril James

    1996-01-01T23:59:59.000Z

    This study evaluated the adequacy of the 2000P test vehicle as a surrogate for light truck subclasses. The National Cooperative Highway Research Program (NCHRP) Report 350 recommended the use of a 3/4-ton (approximately 2000 kg) pickup...

  14. Evaluation of the adequacy of the 2000P test vehicle as a surrogate for light truck subclasses

    E-Print Network [OSTI]

    Titus-Glover, Cyril James

    1996-01-01T23:59:59.000Z

    This study evaluated the adequacy of the 2000P test vehicle as a surrogate for light truck subclasses. The National Cooperative Highway Research Program (NCHRP) Report 350 recommended the use of a 3/4-ton (approximately 2000 kg) pickup...

  15. Assessment of the Adequacy of Natural Gas Pipeline Capacity in the

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 RussianBy:Whether you'reInc.: FederalInter‐stageMarchNortheast United States

  16. "Assessment of the Adequacy of Natural Gas Pipeline Capacity in the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of Bad CholesteroliManage Presentation3 DATE:Northeast United

  17. Assessment of the Adequacy of Natural Gas Pipeline Capacity in the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureComments from Tarasa U.S.LLC |AquionMr.August Contract

  18. THE GRADUATE SCHOOL Graduate School Dissertation Processing Fees

    E-Print Network [OSTI]

    Suzuki, Masatsugu

    THE GRADUATE SCHOOL Graduate School Dissertation Processing Fees Name: B#: Department: Date: Principal Advisor: Determine the processing fees associated with your dissertation below: Dissemination total dollar amt. of all items) NOTE: If your dissertation is over 3" thick, it may be broken into two

  19. Indifference fee rate for variable annuities Etienne CHEVALIER

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Introduced in the 1970s in the United States (see [22]), variable annuities are equity-linked contractsIndifference fee rate for variable annuities Etienne CHEVALIER Thomas LIM Ricardo ROMO ROMERO method for indifference fees. We focus on the guaranteed minimum death benefits and the guaranteed

  20. West Virginia University 1 Tuition, Fees, and Residency

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    Financial Aid Office provides an estimate of the total cost of attendance for an academic year at financialaid.wvu.edu/tuition-cost-information/ cost-of-attendance . This estimate includes tuition and feesWest Virginia University 1 Tuition, Fees, and Residency Cost of an Academic Year's Work The WVU

  1. audit fees evidence: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    audit fees evidence First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 Audit fees and book-tax differences...

  2. Performance Period Total Fee Paid FY2001

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked QuestionsDepartmentGas and| Department of Energy WindowProgram |ImproperFee

  3. Performance Period Total Fee Paid FY2008

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently Asked QuestionsDepartmentGas and| Department of Energy WindowProgram |ImproperFee

  4. Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments

    E-Print Network [OSTI]

    Keinan, Alon

    Animal Health Diagnostic Center Test and Fee Schedule Test Name Test Fee Discipline Test Days Lag** Samples Container Coolant Comments Equine Tests Equine Tests Acid Fast Stain (for bacteria) M-F 1-2 days 1 4 hours for equine. For more information, see Equine Cushing's Tests or AppendixC. For Equine only

  5. Impact of Transmission on Resource Adequacy in Systems with Wind and Solar Power: Preprint

    SciTech Connect (OSTI)

    Ibanez, E.; Milligan, M.

    2012-02-01T23:59:59.000Z

    Variable generation is on track to become a significant contributor to electric power systems worldwide. Thus, it is important to analyze the effect that renewables will have on the reliability of systems. In this paper we present a new tool being implemented at the National Renewable Energy Laboratory, which allows the inclusion of variable generation in the power system resource adequacy. The tool is used to quantify the potential contribution of transmission to reliability in highly interconnected systems and an example is provided using the Western Interconnection footprint.

  6. Demonstrating Structural Adequacy of Nuclear Power Plant Containment Structures for Beyond Design-Basis Pressure Loadings

    SciTech Connect (OSTI)

    Braverman, J.I.; Morante, R.

    2010-07-18T23:59:59.000Z

    ABSTRACT Demonstrating the structural integrity of U.S. nuclear power plant (NPP) containment structures, for beyond design-basis internal pressure loadings, is necessary to satisfy Nuclear Regulatory Commission (NRC) requirements and performance goals. This paper discusses methods for demonstrating the structural adequacy of the containment for beyond design-basis pressure loadings. Three distinct evaluations are addressed: (1) estimating the ultimate pressure capacity of the containment structure (10 CFR 50 and US NRC Standard Review Plan, Section 3.8) ; (2) demonstrating the structural adequacy of the containment subjected to pressure loadings associated with combustible gas generation (10 CFR 52 and 10 CFR 50); and (3) demonstrating the containment structural integrity for severe accidents (10 CFR 52 as well as SECY 90-016, SECY 93-087, and related NRC staff requirements memoranda (SRMs)). The paper describes the technical basis for specific aspects of the methods presented. It also presents examples of past issues identified in licensing activities related to these evaluations.

  7. Requirements for Using and Administering Cost-plus-award-fee...

    Office of Environmental Management (EM)

    Federal Acquisition Regulation (FAR) required the following in using and administering a cost-plus-award-fee contract: 1. neither a firm-fixed-price nor a fixed-priced incentive...

  8. The Economics of Interchange Fees and Their Regulation: An Overview

    E-Print Network [OSTI]

    Evans, David

    2005-07-08T23:59:59.000Z

    This essay surveys the economic literature on interchange fees and the debate over whether interchange should be regulated and, if so, how. We consider, first, the operation of unitary payment systems, like American Express, ...

  9. Spent fuel management fee methodology and computer code user's manual.

    SciTech Connect (OSTI)

    Engel, R.L.; White, M.K.

    1982-01-01T23:59:59.000Z

    The methodology and computer model described here were developed to analyze the cash flows for the federal government taking title to and managing spent nuclear fuel. The methodology has been used by the US Department of Energy (DOE) to estimate the spent fuel disposal fee that will provide full cost recovery. Although the methodology was designed to analyze interim storage followed by spent fuel disposal, it could be used to calculate a fee for reprocessing spent fuel and disposing of the waste. The methodology consists of two phases. The first phase estimates government expenditures for spent fuel management. The second phase determines the fees that will result in revenues such that the government attains full cost recovery assuming various revenue collection philosophies. These two phases are discussed in detail in subsequent sections of this report. Each of the two phases constitute a computer module, called SPADE (SPent fuel Analysis and Disposal Economics) and FEAN (FEe ANalysis), respectively.

  10. SUMMARY OF FEE EARNED IN FY14.xlsx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    incentivized. * Metric 3 MAXIMUM FEE FOR METRIC 3 - 2,500,000 3.a Completion of the 220 preventive maintenance procedures by April 30, 2014 will earn the contractor 450,000....

  11. City of Philadelphia- Streamlined Solar Permitting and Fee Reduction

    Broader source: Energy.gov [DOE]

    Photovoltaic systems of 10 kW or less installed on 1- or 2-family residential units are eligible for streamlined permitting and a fee reduction. PV projects can use a [http://www.phila.gov/green...

  12. Small Business Administration (SBA) Guarantee Fee Tax Credit (Oklahoma)

    Broader source: Energy.gov [DOE]

    The Small Business Administration (SBA) Guarantee Fee Tax Credit allows for small businesses operating in Oklahoma to claim a credit against income tax liability. This credit may be claimed for tax...

  13. assessment test program: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    assessment test program First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 Assessing Test Set Adequacy for...

  14. Postprint of article in Information and Software Technology (2012) On the adoption of MC/DC and control-flow adequacy

    E-Print Network [OSTI]

    2012-01-01T23:59:59.000Z

    /DC and control-flow adequacy for a tight integration of program testing and statistical fault localization*,** Bo programs using three adequacy criteria, 16 test case prioritization techniques, and four statistical fault, Beijing, China A B S T R A C T Context: Testing and debugging consume a significant portion of software

  15. OMB Control # 0648-0376 Expires 2/29/2012 Fee Collector's Name

    E-Print Network [OSTI]

    OMB Control # 0648-0376 Expires 2/29/2012 Fee Collector's Name Mailing Address City State Zip Phone Verification: Instructions: 1. Complete the fee collector's name, address, phone number, crab receiver permit

  16. FY 1996 performance evaluation and incentive fee agreement for the Pacific Northwest National Laboratory

    SciTech Connect (OSTI)

    NONE

    1996-01-08T23:59:59.000Z

    The document describes the critical outcomes, objectives, performance indicators, expected levels of performance, specific detail on incentive fee, and agreements concerning the evaluation of the Pacific Northwest National Laboratory`s FY 1996 Self-Assessment. This information will be the basis for the evaluation of the Laboratory`s performance as required by Articles H-24 and H-25 of the Contract. For the period October 1, 1995 through September 30, 1996, the Parties have agreed to measure and evaluate the individual areas of Laboratory activities identified herein. This reflects the fact that the Contractor will be evaluated on two dimensions, namely (1) accomplishment of critical outcomes and (2) the effectiveness of the Contractor`s self-assessment program. Each area will receive its own evaluation rating and they will be combined to determined an overall rating with the first area weighted at 75% and the second area weighted at 25%.

  17. West Virginia University 1 Tuition, Fees and Residency

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    West Virginia University 1 Tuition, Fees and Residency Page Contents: · Academic Common Market Academic Common Market West Virginia provides its residents the opportunity, through the Academic Common. The programs are restricted to West Virginia residents who have been accepted for admission to one

  18. Fees and Exemptions for students enrolled in Laurea Magistrale

    E-Print Network [OSTI]

    ' and PhD students' Services Area Registrar's Office Service Last updated: 15 October 2013 #12;2 All1 Fees and Exemptions for students enrolled in Laurea Magistrale (equivalent to a Master of Science" The information contained in the Guides and provided through the online tools listed above is considered official

  19. Fees and Exemptions for students enrolled in Laurea Magistrale

    E-Print Network [OSTI]

    ' and PhD students' Services Area Registrar's Office Service Last updated: 29 October 2013 #12;2 All1 Fees and Exemptions for students enrolled in Laurea Magistrale (equivalent to a Master of Science" The information contained in the Guides and provided through the online tools listed above is considered official

  20. West Virginia University 1 Tuition, Fees and Residency

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    Year's Work The WVU Financial Aid Office provides an estimate of the total cost of attendance for an academic year at financialaid.wvu.edu/tuition-cost-information/ cost-of-attendance. This estimate includesWest Virginia University 1 Tuition, Fees and Residency In this section: Cost: Cost of an Academic

  1. West Virginia University 1 Tuition, Fees and Residency

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    of an Academic Year's Work The WVU Financial Aid Office provides an estimate of the total cost of attendance for an academic year at financialaid.wvu.edu/tuition-cost-information/ cost-of-attendance. This estimate includesWest Virginia University 1 Tuition, Fees and Residency In this section: COST: Cost of an Academic

  2. Equity Evaluation of Vehicle Miles Traveled Fees in Texas

    E-Print Network [OSTI]

    Larsen, Lisa Kay

    2012-10-19T23:59:59.000Z

    to the infrastructure but the money needed to maintain and improve roadways is not being adequately generated. One proposed alternative to the gas tax is the creation of a vehicle miles traveled (VMT) fee; with equity being a crucial issue to consider. This research...

  3. Equity Evaluation of Vehicle Miles Traveled Fees in Texas

    E-Print Network [OSTI]

    Larsen, Lisa Kay

    2012-10-19T23:59:59.000Z

    to the infrastructure but the money needed to maintain and improve roadways is not being adequately generated. One proposed alternative to the gas tax is the creation of a vehicle miles traveled (VMT) fee; with equity being a crucial issue to consider. This research...

  4. Affordability Annual Tuition and Fees while attending the

    E-Print Network [OSTI]

    Almor, Amit

    increases **Students should expect additional costs including but not limited to: airfare to and from Hong Kong, local transportation, local cell phone plan, mainland China visa, and required group travel. premium apartment) Tuition and Fees while attending the first summer language training at the Yale-China

  5. DEVELOPMENT IMPACT FEE ADOPTION AND ITS EFFECTS IN TEXAS

    E-Print Network [OSTI]

    Ambs, Jonathan G.

    2010-01-20T23:59:59.000Z

    as the dependent variable and the second model looked at the total impact fee assed on new residential units as the dependent variable. Both models used the gross tax rate, debt per capita, change in city population as a percentage, city population, average price...

  6. Annual Summary of Immobilized Low Activity Tank Waste (ILAW) Performance Assessment for 2002

    SciTech Connect (OSTI)

    MANN, F M

    2002-08-01T23:59:59.000Z

    As required by the Department of Energy ( DOE), an annual summary of the adequacy of the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (ILAW PA) is necessary in each year in which a full performance assessment is not issued.

  7. Rules and Regulations Governing the Establishment of Various Fees (Rhode Island)

    Broader source: Energy.gov [DOE]

    These regulations describe the fees associated with several Department of Environmental Management regulatory programs, including programs pertaining to pollutant and wastewater discharge,...

  8. For information on current fee levels, see: www.strath.ac.uk/registry/students/finance

    E-Print Network [OSTI]

    Mottram, Nigel

    Fees For information on current fee levels, see: www.strath.ac.uk/registry/students/finance How Enquiries can be made to either of the following in the Department of Accounting & Finance: Professor Dick Davies Course Director, Investment & Finance t: +44 (0)141 548 3710 e: jr.davies@strath.ac.uk Barbara

  9. Fees are subject to change. See studyguide.au.dk *PLACE OF STUDY

    E-Print Network [OSTI]

    on two areas: Renewable Energy, where stu- dents develop and apply technologies within renewable energyFees are subject to change. See studyguide.au.dk *PLACE OF STUDY Herning ANNUAL TUITION FEE EU/EEA/Swiss equips students to design the software and electronics of the future to design energy-friendly systems

  10. UNIVERSITY OF NEVADA, LAS VEGAS DIFFERENTIAL FEE PROPOSAL FOR UNLV PHYSICAL THERAPY

    E-Print Network [OSTI]

    Hemmers, Oliver

    Course Fee PT - Doctoral. $450 450 $0 PT - Materials Fee $250 250 $0 DPT 730 $50 $0 $50 DPT 741 $50 $0 $50 DPT 744 $450 $0 $450 DPT 745 $450 $0 $450 DPT 750 $75 $0 $75 DPT 752 $50 $0 $50 DPT 753 Course

  11. Fees are subject to change. See studyguide.au.dk *PLACE OF STUDY

    E-Print Network [OSTI]

    .au.dk/agrobiology Climate change and population growth pose a huge, multifaceted, worldwide challenge to agriculturalFees are subject to change. See studyguide.au.dk *PLACE OF STUDY Aarhus ANNUAL TUITION FEE EU, and organic agriculture and tailor their degree with elective courses on top of the mandatory courses

  12. Tuition & Fee Installment Payment Plans -$25 non-refundable Enrollment Fee per plan applies and is due at the time of enrollment.

    E-Print Network [OSTI]

    a checking/savings account or from a credit card (a convenience fee applies for all credit card transactions that they save this under their favorites. The link is also located on the CSM Accounts

  13. Contractor Fee Payments - Savannah River Site Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: Theof"Wave theJuly 30, 2013 Sanyo: NoticeContinuingFinancingContractor Fee

  14. Oregon Fees for Underground Injection Control Program Fact Sheet | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:Energy Information Fees for Underground Injection Control Program

  15. Oregon Stormwater Permit Application Forms and Permit Fees Website | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:Energy Information FeesInformation Section 401StateEnergy

  16. Oregon Underground Injection Control Registration Application Fees (DEQ

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:Energy Information FeesInformation SectionInformationForm

  17. Alternative Fuels Data Center: State Fees as Transportation Funding

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWP TWP RelatedCellulaseFuelsConversions toSchoolAlternatives Fees as

  18. Advance disposal fees and recycling: Partners or foes?

    SciTech Connect (OSTI)

    Woods, R.

    1995-05-01T23:59:59.000Z

    A political trend of shifting government responsibilities from the federal to the state and local level is beginning to take hold in many municipalities this year. Evidence of this shift recently was codified by the passage of Congress`s unfunded mandates bills, which require a panel review of any federal government mandates that create a cost burden of at least $50 million on state and local government. Expecting to be freed from the yoke of the most costly unfunded federal laws, many states are taking a second look at their expensive recycling laws and considering reassessment of how funding mechanisms are structured. This search for ways to raise revenue has renewed the continuing debate over advance disposal fees (ADFs), which are included in the cost of a product to pay for its ultimate disposal or reuse. These ADFs have been used for several years in a majority of US states to help handle scrap tire disposal. Due to concern over fire hazards posed by the nation`s growing scrap tire piles, several states have implemented a $1--$2 fee on each tire to help pay for disposal, most of which have been reasonably successful.

  19. Assessing Reliability in Energy Supply Systems

    E-Print Network [OSTI]

    McCarthy, Ryan; Ogden, Joan M.; Sperling, Dan

    2008-01-01T23:59:59.000Z

    total of 15 metrics. Pathway reliability General objectives Adequacy Security Functional zones Primary energy supply

  20. Assessing reliability in energy supply systems

    E-Print Network [OSTI]

    McCarthy, Ryan W.; Ogden, Joan M.; Sperling, Daniel

    2007-01-01T23:59:59.000Z

    total of 15 metrics. Pathway reliability General objectives Adequacy Security Functional zones Primary energy supply

  1. Resource AdequacyResource Adequacy Advisory Committee

    E-Print Network [OSTI]

    Oct 2016 to Sep 2017 Oct 2018 to Sep 2019 Number of Games 6160 (all comb hydro and wind) 6160 Random 2019 (proposed) Fed Hydro balancing reserves 900 INC and 1100 DEC 900 INC and 1100 DEC NonFed Hydro Energy Imbalance Market Not modeled Not modeled Borrowed hydro 1000 MWperiods 1000 MWperiods Hydro

  2. Local Option- Building Permit Fee Waivers for Renewable Energy Projects (Connecticut)

    Broader source: Energy.gov [DOE]

    As of July 2011, Connecticut authorizes municipalities to pass a local ordinance to exempt "Class I" renewable energy projects from paying building permit fees. Class I renewable energy projects...

  3. Coordinated Fee Structure for Developed Recreation Sites on the Ashley, Uinta, and Wasatch-Cache

    E-Print Network [OSTI]

    Standiford, Richard B.

    Federal and State agencies and private campgrounds in geographical areas of concern to determine fee, such as water, sewer, electricity and recreational equipment/infrastructure. 1 An abbreviated version

  4. 16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security...

    Open Energy Info (EERE)

    Fees and Financial Security Requirements Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: 16 TAC, part 1, chapter 3, rule...

  5. Tuition and Fees Your education is an investment that can lead to new professional opportunities, personal

    E-Print Network [OSTI]

    Vertes, Akos

    Tuition and Fees Your education is an investment that can lead to new professional opportunities,485 per credit hour*** Cost of books is not included in the course tuition. Specific details

  6. City of Santa Monica- Building Permit Fee Waiver for Solar Projects

    Broader source: Energy.gov [DOE]

    In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff...

  7. FY 12 Award Fee Determination Scorecard Contractor: B&W Conversion...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Award Fee The first PBI was based on the state of readiness of the Paducah and Piketon Depleted Uranium Hexafluoride (DUF 6 ) conversion plants as of September 30, 2011. BWCS...

  8. Comprehensive Equity Analysis of Mileage Based User Fees: Tazation and Expenditures for Roadways and Transit

    E-Print Network [OSTI]

    Carlton, Justin David

    2014-01-07T23:59:59.000Z

    Lack of sustainable revenue generation for transportation infrastructure has created a need for alternative funding sources. The most prominent of which is the Mileage Based User Fee (MBUF), where drivers would be charged based on the number...

  9. [Type text] 2012 Higher Education Units and Fees (version 1) October 2011 Page 1

    E-Print Network [OSTI]

    EDUCATION UNITS AND FEES UNIT CODE UNIT TITLE CreditPts EFTSL UnitFeefor 2012/11/10CSP UnitFeeforpre- 2010CSP UnitFeeforpre- 2009CSP UnitFeeforpre- 2008CSP FullTuitionFees fornon-CSP ACH400 RESEARCHFeefor 2012/11/10CSP UnitFeeforpre- 2010CSP UnitFeeforpre- 2009CSP UnitFeeforpre- 2008CSP Full

  10. Test of the adequacy of using smoothly joined parabolic segments to parametrize the multihumped fission barriers in actinides

    SciTech Connect (OSTI)

    Bhandari, B.S. (Department of Physics, Faculty of Science, University of Garyounis, Benghazi (Libya))

    1990-10-01T23:59:59.000Z

    The adequacy of using smoothly joined parabolic segments to parametrize the multihumped fission barriers has been tested by examining its simultaneous consistency with the three relevant fission observables, namely, the near-barrier fission cross sections, isomeric half-lives, and the ground-state spontaneous fission half-lives of a wide variety of a total of 25 actinide nuclides. The penetrabilities through such multihumped fission barriers have been calculated in the Wentzel-Kramers-Brillouin approximation, and the various fission half-lives have been determined using the formalism given earlier by Nix and Walker. The results of our systematic analysis of these actinide nuclides suggest that such a parametrization is quite adequate at least for the even-even nuclei, as it reproduces satisfactorily their various observed fission characteristics. Major difficulties remain, however, for the odd mass and for the doubly odd nuclei where the calculated ground-state spontaneous fission half-lives are found to be several orders of magnitude larger than those measured. Possible reasons for such discrepancies are discussed. Fission branching ratios of the decay of the shape isomers in various actinide nuclides have also been calculated and are compared with their measured values.

  11. Tiger Team Assessment of the Ames Laboratory

    SciTech Connect (OSTI)

    Not Available

    1992-03-01T23:59:59.000Z

    This report documents the Tiger Assessment of the Ames Laboratory (Ames), located in Ames, Iowa. Ames is operated for the US Department of Energy (DOE) by Iowa State University. The assessment was conducted from February 10 to March 5, 1992, under the auspices of the Office of Special Projects, Office of the Assistant Secretary of Environment, Safety and Health, Headquarters, DOE. The assessment was comprehensive, encompassing Environment, Safety, and Health (ES H) disciplines; management practices; and contractor and DOE self-assessments. Compliance with applicable Federal, State of Iowa, and local regulations; applicable DOE Orders; best management practices; and internal requirements at Ames Laboratory were assessed. In addition, an evaluation of the adequacy and effectiveness of DOE and the site contractor's management of ES H/quality assurance program was conducted.

  12. Rules and Regulations Pertaining to a User Fee System for Point Source Dischargers that Discharge Pollutants into the Waters of the State (Rhode Island)

    Broader source: Energy.gov [DOE]

    These regulations establish a user fee system for point source dischargers that discharge pollutants into the surface waters of the State. The funds from such fees are used by the Department of...

  13. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    SciTech Connect (OSTI)

    Not Available

    1993-04-01T23:59:59.000Z

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  14. COMPUTER FEE ALLOCATION COMMITTEE PROPOSAL MONTANA STATE UNIVERSITY

    E-Print Network [OSTI]

    Lawrence, Rick L.

    as an end-of-project assessment. 7. Provide a prioritized list of HARDWARE/EQUIPMENT and the estimated cost

  15. COMPUTER FEE ALLOCATION COMMITTEE PROPOSAL MONTANA STATE UNIVERSITY

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    an annual progress report as well as an end-of-project assessment. 7. Provide a prioritized list of HARDWARE

  16. U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site

    SciTech Connect (OSTI)

    NONE

    1995-08-03T23:59:59.000Z

    During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

  17. Adequacy for Algebraic Effects

    E-Print Network [OSTI]

    Plotkin, Gordon; Power, John

    2002-01-01T23:59:59.000Z

    Moggi proposed a monadic account of computational effects. He also presented the computational lamda-calculus, c, a core call-by-value functional programming language for effects; the effects are obtained by adding ...

  18. Resource Adequacy INTRODUCTION

    E-Print Network [OSTI]

    ) have acquired sufficient resources to satisfy forecasted future loads reliably. This definition whether there are sufficient non-hydro resources available to meet loads when the "fuel" for hydroelectric. For a number of reasons, resource development in the 1990s failed to keep pace with growth in the region and

  19. EIR Charging Policy The University can charge a fee for the provision of information requested under the Environmental

    E-Print Network [OSTI]

    Glasgow, University of

    under the Environmental Information (Scotland) Regulations 2004. This policy is the UniversityEIR Charging Policy The University can charge a fee for the provision of information requested policy, the University will process the first 100 free of charge. Above the 100 threshold, fees

  20. Statistics Fees Scholarship R E G U L A T I O N S F O R 2 0 1 4

    E-Print Network [OSTI]

    Waikato, University of

    Statistics Fees Scholarship R E G U L A T I O N S F O R 2 0 1 4 BACKGROUND These Scholarships were will be known as the Statistics Fees Scholarships. 2. The Scholarship will have a value of up to $2. 4. The Statistics Fees Scholarship is open to applicants who are enrolling in the second or third

  1. Adequacy of a Small Quantity Site RH-TRU Waste Program in Meeting Proposed WIPP Characterization Objectives

    SciTech Connect (OSTI)

    Biedscheid, J.; Stahl, S.; Devarakonda, M.; Peters, K.; Eide, J.

    2002-02-26T23:59:59.000Z

    The first remote-handled transuranic (RH-TRU) waste is expected to be permanently disposed of at the Waste Isolation Pilot Plant (WIPP) during Fiscal Year (FY) 2003. The first RH-TRU waste shipments are scheduled from the Battelle Columbus Laboratories (BCL) to WIPP in order to facilitate compliance with BCL Decommissioning Project (BCLDP) milestones. Milestones requiring RH-TRU waste containerization and removal from the site by 2004 in order to meet a 2006 site closure goal, established by Congress in the Defense Facilities Closure Projects account, necessitated the establishment and implementation of a site-specific program to direct the packaging of BCLDP RH-TRU waste prior to the finalization of WIPP RH-TRU waste characterization requirements. The program was designed to collect waste data, including audio and videotape records of waste packaging, such that upon completion of waste packaging, comprehensive data records exist from which compliance with final WIPP RH-TRU waste characterization requirements can be demonstrated. With the BCLDP data records generated to date and the development by the U.S. Department of Energy (DOE)-Carlsbad Field Office (CBFO) of preliminary documents proposing the WIPP RH-TRU waste characterization program, it is possible to evaluate the adequacy of the BCLDP program with respect to meeting proposed characterization objectives. The BCLDP characterization program uses primarily acceptable knowledge (AK) and visual examination (VE) during waste packaging to characterize RH-TRU waste. These methods are used to estimate physical waste parameters, including weight percentages of metals, cellulosics, plastics, and rubber in the waste, and to determine the absence of prohibited items, including free liquids. AK combined with computer modeling is used to estimate radiological waste parameters, including total activity on a waste container basis, for the majority of BCLDP RH-TRU waste. AK combined with direct analysis is used to characterize radiological parameters for the small populations of the RH-TRU waste generated by the BCLDP. All characterization based on AK is verified. Per its design for comprehensive waste data collection, the BCLDP characterization program using AK and waste packaging procedures, including VE during packaging, meets the proposed WIPP RH-TRU waste characterization objectives. The conservative program design implemented generates certification data that will be adequate to meet any additional program requirements that may be imposed by the CBFO.

  2. Assessing the transport and fate of bioengineered microorganisms in the environment

    SciTech Connect (OSTI)

    Barnthouse, L.W.; Palumbo, A.V.

    1985-01-01T23:59:59.000Z

    We review the methods currently available for quantifying the transport and fate of microbes in atmospheric and aqueous media and assess their adequacy for purposes of risk assessment. We review the literature on transport and fate of microorganisms, including studies of: (1) pathways of migration, (2) the survival of microorganisms during transport and fate. In addition, we review the transport and fate models that have been used in environmental risk assessments for radionuclides and toxic chemicals and evaluate their applicability to the problem of assessing environmental risks of bioengineered microorganisms.

  3. Effect of Proposed Port User Fees on Export Grain Flow Patterns.

    E-Print Network [OSTI]

    Viscencio-Brambila, Hector; Fuller, Stephen W.

    1987-01-01T23:59:59.000Z

    and the resulting user fee is proj ected to redirect nearly 160 million bushels of corn and soybeans from this port area. This grain is redirected to Mississippi River ports which are projected to increase export volume by 248 million bushels. A portion..., and North Atlantic port areas. The Mississippi River port area is the most impor tant grain outlet in the nation, accounting for up to 40 percent of U.S. agriculture's grain exports. Depend ing on the user fee scenario analyzed, increases in export...

  4. !Y-Y-2000062! J:\\Registration,Readmits,Spec. programs\\Data (Forms, Reports, Etc.)\\Registrar Forms and Petitions\\Word Docs\\Partial Fee Reduction_Barcoded.doc

    E-Print Network [OSTI]

    California at Santa Barbara, University of

    and Petitions\\Word Docs\\Partial Fee Reduction_Barcoded.doc Revised 5/26/2011 SS REQUEST FOR PARTIAL FEE Educational Fee and must be submitted to the Office of the Registrar. A petition for a deficit load should to a complete withdraw from the University. 2. Approval for partial fee reduction is not automatic. To qualify

  5. Tiger Team assessment of the Sandia National Laboratories, Albuquerque

    SciTech Connect (OSTI)

    Not Available

    1991-05-01T23:59:59.000Z

    This report documents the Tiger Team Assessment of Sandia National Laboratories (SNL), Albuquerque, located in Albuquerque, New Mexico. SNL, Albuquerque, is operated by the Sandia Corporation (a wholly owned subsidiary of the American Telephone and Telegraph Company) for the US Department of Energy (DOE). The environmental assessment also included DOE tenant facilities at Ross Aviation, Albuquerque Microelectronics Operation, and the Central Training Academy. The assessment was conducted from April 15 to May 24, 1991, under the auspices of DOE's Office of Special Projects under the Assistant Secretary for Environment, Safety and Health (ES H). The assessment was comprehensive, encompassing ES H disciplines, management, self-assessments, and quality assurance; transportation; and waste management operations. Compliance with applicable federal, state, and local regulations; applicable DOE Orders; best management practices; and internal SNL, Albuquerque, requirements were assessed. In addition, an evaluation of the adequacy and effectiveness of DOE and SNL, Albuquerque management of ES H programs was conducted.

  6. Tiger Team Assessment of the Los Alamos National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1991-11-01T23:59:59.000Z

    This report documents the Tiger Team Assessment of the Los Alamos National Laboratory (LANL) located in Los Alamos, New Mexico. LANL is operated for the US Department of Energy (DOE) by the University of California. The Tiger Team Assessment was conducted from September 23 to November 8, 1991, under the auspices of the DOE Office of Special Projects, Office of Assistant Secretary for Environment, Safety and Health. The assessment was comprehensive, encompassing environmental, safety, and health (ES H) disciplines; management; and contractor and DOE self-assessments. Compliance with applicable Federal, state, and local regulations; applicable DOE Orders; best management practices; and internal LANL site requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of the DOE and the site contractors' management of ES H/quality assurance programs was conducted. This volume discusses findings concerning the environmental assessment.

  7. Office of Inspector General report on audit of Department of Energy management and operating contractor available fees

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    The Office of Procurement and Assistance Management has proposed changes to the method used to annually calculate and negotiate ``for profit`` management and operating contractor available fees. This proposal will increase contractor fees in exchange for the contractor`s purported assumption of additional risk. In 1991, the Department, through the Accountability Rule, increased contractor fees as an incentive to improve contractor performance and accountability. Despite the lack of measurable benefits of this effort, the Department is crafting a new fee policy which will, depending upon how it is executed, increase fees above the amount provided through the Accountability Rule as an incentive to the Department`s management and operating contractors. The objective of the audit was to determine whether the Department`s proposed change to the fee structure for determining management and operating contractor fees will be cost effective. This report describes the study`s approach, its findings and recommendations, management and auditor comments, and includes appendices with further data.

  8. INTRAMURALSSpring Team Sports* Registration accepted for teams or "free agent" individuals. $25 registration fee required

    E-Print Network [OSTI]

    Lawrence, Rick L.

    INTRAMURALSSpring Team Sports* Registration accepted for teams or "free agent" individuals. $25 registration fee required for all teams: due upon team registration online. (Refundable if no games the team manager via email or text message (through the website). Call the Equipment Room at 994

  9. INTRAMURALSFall Team Sports* Registration accepted for teams or "free agent" individuals. $25 registration fee required

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    INTRAMURALSFall Team Sports* Registration accepted for teams or "free agent" individuals. $25 registration fee required for all teams: due upon team registration online. (Refundable if no games the team manager via email or text message (through the website). Call the Equipment Room at 994

  10. INTRAMURALSSummer Team Sports* Registration accepted for teams or "free agent" individuals. $25 registration fee required

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    INTRAMURALSSummer Team Sports* Registration accepted for teams or "free agent" individuals. $25 registration fee required for all teams: due upon team registration online. (Refundable if no games the team manager via email or text message. Recreational Sports & Fitness 120 Marga Hosaeus Fitness Center

  11. Boston University User Fee Structure for ICP-ES, ICP-MS and Laser Labs

    E-Print Network [OSTI]

    Hutyra, Lucy R.

    Cost per sample by laser ablation includes three spots on a sample plus an additional three spotsBoston University User Fee Structure for ICP-ES, ICP-MS and Laser Labs The Department of Earth come to BU and digest their samples in our labs with sufficient training. Laser-ICP-MS cost per sample

  12. STATEMENT OF UNDERSTANDING UCLA ACADEMIC APPRENTICE PERSONNEL FEE REMISSION BENEFITS FOR 2014-2015

    E-Print Network [OSTI]

    Williams, Gary A.

    STATEMENT OF UNDERSTANDING UCLA ACADEMIC APPRENTICE PERSONNEL FEE REMISSION BENEFITS FOR 2014-2015 Congratulations on receiving an academic apprentice appointment at UCLA! Academic apprentice titles are intended in teaching and research. Apprentice personnel in the research series (i.e., Graduate Student Researchers

  13. Page 1 of 2 2014-15 Postgraduate Tuition Fees for Institute of Petroleum

    E-Print Network [OSTI]

    Greenaway, Alan

    Page 1 of 2 2014-15 Postgraduate Tuition Fees for Institute of Petroleum Engineering programmes Programme title Award FT PT FT PT FT PT Petroleum Geoscience MSc / PGDip 9,720 - 11,470 - 25,920 - Petroleum Engineering MSc / PGDip 9,720 - 11,470 - 25,920 - Reservoir Evaluation & Management MSc / PGDip

  14. Page 1 of 3 2013-14 Postgraduate Tuition Fees for Institute of Petroleum

    E-Print Network [OSTI]

    Painter, Kevin

    Page 1 of 3 2013-14 Postgraduate Tuition Fees for Institute of Petroleum Engineering programmes Overseas Home/EU Overseas Programme title Award FT PT FT PT FT PT FT PT FT PT Petroleum Geoscience MSc campus) MSc / PGDip / PGCert 4,600 - 5,430 - 12,000 - 4,520 - 23,400 - Petroleum Engineering MSc

  15. The US Department of Energy`s prime contractor fees on subcontractor costs

    SciTech Connect (OSTI)

    NONE

    1998-09-11T23:59:59.000Z

    In Fiscal Year 1996, the Department`s prime contractors awarded $5.3 billion in subcontracts. The purpose of this audit was to determine if the Department adjusted the fee bases of prime contractors to reflect the actual effort necessary to manage the technical and administrative activities of their subcontractors.

  16. 2009 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analysis

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2010-03-15T23:59:59.000Z

    The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 Radioactive Wate Management Site (RWMS) Performance Assessments (PAs) and Composite Analyses (CAs) in fiscal year (FY) 2009. This annual summary report presents data and conclusions from the FY 2009 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.

  17. Rental rate includes liability insurance (LDW), vehicle licensing fees, unlimited roundtrip mileage; $0.25/mile for one-way rentals and no drop fees for vehicles that are picked up and returned in the

    E-Print Network [OSTI]

    Arnold, Jonathan

    ; $0.25/mile for one-way rentals and no drop fees for vehicles that are picked up and returned in setting up direct billing for your department, please click link below: http://www

  18. Endoscopic ultrasound-guided fine needle aspiration of the pancreas: cytomorphological evaluation with emphasis on adequacy assessment, diagnostic criteria and contamination from the gastrointestinal tract

    E-Print Network [OSTI]

    Mitsuhashi, T; Ghafari, S; Chang, C Y; Gu, M

    2006-01-01T23:59:59.000Z

    criteria and contamination from the gastrointestinal tract 1criteria and contamination from the gastrointestinal tractneoplasms and contamination from the gastrointestinal (GI)

  19. October 24, 2003, Assessment Criteria and Guidelines for Determining the Adequacy of Software Used in the Safety Analysis and Design of Defense Nuclear Facilities

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagementOPAM Policy AcquisitionWeatherizationDepartment of

  20. SUMMARY OF PROPOSED AMENDMENT TO REGULATION FSU-2.024, TUITION AND FEES; MS-NURSE ANESTHESIA PROGRAM; MD TUITION

    E-Print Network [OSTI]

    Weston, Ken

    SUMMARY OF PROPOSED AMENDMENT TO REGULATION FSU-2.024, TUITION AND FEES; MS-NURSE ANESTHESIA for a new Master of Science in Nurse Anesthesia program at the Panama City Florida Campus. The new program

  1. Proposals for Technology Innovation Projects Student technology fees are intended to enhance student learning and the student

    E-Print Network [OSTI]

    Farritor, Shane

    Proposals for Technology Innovation Projects Student technology fees scale if effective. Timeline Applications for Technology Innovation Projects innovative ideas about using technology? 2) Is the project designed to be led

  2. 2008 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2009-03-30T23:59:59.000Z

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs) for each of the facilities, with the results submitted annually to U.S. Department of Energy (DOE) Headquarters. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan. The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) performed an annual review in fiscal year (FY) 2008 by evaluating operational factors and research results that impact the continuing validity of the PAs and CAs. This annual summary report presents data and conclusions from the FY 2008 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada Test Site relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.

  3. SEVIS FEE (I-901) for J and F visa applicants Please see US Government Website at www.fmjfee.com

    E-Print Network [OSTI]

    their entry to, stay in, and exit from the United States, will be used to record and track the I-901 fee.1a) wishing to apply for F-1, F-3, M-1, M-3, or J-1 status at a Port of Entry into the United States must pay and process the SEVIS fee before appearing at the Port of Entry. Nonimmigrants currently

  4. Review of the Diablo Canyon probabilistic risk assessment

    SciTech Connect (OSTI)

    Bozoki, G.E.; Fitzpatrick, R.G.; Bohn, M.P. [Sandia National Lab., Albuquerque, NM (United States); Sabek, M.G. [Atomic Energy Authority, Nuclear Regulatory and Safety Center, Cairo (Egypt); Ravindra, M.K.; Johnson, J.J. [EQE Engineering, San Francisco, CA (United States)

    1994-08-01T23:59:59.000Z

    This report details the review of the Diablo Canyon Probabilistic Risk Assessment (DCPRA). The study was performed under contract from the Probabilistic Risk Analysis Branch, Office of Nuclear Reactor Research, USNRC by Brookhaven National Laboratory. The DCPRA is a full scope Level I effort and although the review touched on all aspects of the PRA, the internal events and seismic events received the vast majority of the review effort. The report includes a number of independent systems analyses sensitivity studies, importance analyses as well as conclusions on the adequacy of the DCPRA for use in the Diablo Canyon Long Term Seismic Program.

  5. Tiger Team Assessment of the Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Not Available

    1990-07-01T23:59:59.000Z

    This document contains findings and concerns identified during the Tiger Team Assessment of the Department of Energy's (DOE) Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The assessment was directed by the Department's Office of Environment, Safety and Health (ES H) and was conducted from June 18 to July 20, 1990. The PGDP Tiger Team Assessment is comprehensive in scope. It covers the Environmental, Safety and Health (including OSHA Compliance), and Management areas and determines the site's compliance with applicable federal (including DOE), state, and local regulations and requirements. The objective of the assessment program is to provide the Secretary with information on the current ES H compliance status of DOE facilities, root causation for noncompliance, adequacy of DOE and site contractor ES H management programs, response actions to address the identified problem areas, and DOE-wide ES H compliance trends and root causes.

  6. Tiger Team Assessment of the Paducah Gaseous Diffusion Plant

    SciTech Connect (OSTI)

    Not Available

    1990-07-01T23:59:59.000Z

    This document contains findings and concerns identified during the Tiger Team Assessment of the Department of Energy's (DOE's) Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The assessment was directed by the Department's Office of Environment, Safety and Health (ES H) and was conducted from June 18 to July 20, 1990. The PGDP Tiger Team Assessment is comprehensive in scope. It covers the Environmental, Safety and Health (including OSHA Compliance), and Management areas and determines the site's compliance with applicable federal (including DOE), state, and local regulations and requirements. The objective of the assessment program is to provide the Secretary with information on the current ES H compliance status of DOE facilities, root causation for noncompliance, adequacy of DOE and site contractor ES H management programs, response actions to address the identified problem areas, and DOE-wide ES H compliance trends and root causes. This volume contains appendices.

  7. Tiger Team Assessment of the Naval Petroleum Reserves in California

    SciTech Connect (OSTI)

    Not Available

    1991-12-01T23:59:59.000Z

    This report documents the Tiger Team Assessment of the Naval Petroleum Reserves in California (NPRC) which consists of Naval Petroleum Reserve Number 1 (NPR-1), referred to as the Elk Hills oil field and Naval Petroleum Reserve Number 2 (NPR-2), referred to as the Buena Vista oil field, each located near Bakersfield, California. The Tiger Team Assessment was conducted from November 12 to December 13, 1991, under the auspices of DOE's Office of Special Projects (OSP) under the Assistant Secretary for Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety, and health (ES H), and quality assurance (OA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal, State of California, and local regulations; applicable DOE Orders; best management practices; and internal NPRC requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of DOE/NPRC, CUSA, and BPOI management of the ES H/QA programs was conducted.

  8. Tiger Team Assessment of the Naval Petroleum Reserves in California

    SciTech Connect (OSTI)

    Not Available

    1991-12-01T23:59:59.000Z

    This report documents the Tiger Team Assessment of the Naval Petroleum Reserves in California (NPRC) which consists of Naval Petroleum Reserve Number 1 (NPR-1), referred to as the Elk Hills oil field and Naval Petroleum Reserve Number 2 (NPR-2), referred to as the Buena Vista oil field, each located near Bakersfield, California. The Tiger Team Assessment was conducted from November 12 to December 13, 1991, under the auspices of DOE`s Office of Special Projects (OSP) under the Assistant Secretary for Environment, Safety and Health (EH). The assessment was comprehensive, encompassing environmental, safety, and health (ES&H), and quality assurance (OA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal, State of California, and local regulations; applicable DOE Orders; best management practices; and internal NPRC requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of DOE/NPRC, CUSA, and BPOI management of the ES&H/QA programs was conducted.

  9. POSTGRADUATE TUITION FEES 2013/14 FULL TIME PROGRAMMES -UK/EU STUDENTS

    E-Print Network [OSTI]

    Anderson, Jim

    & IS Management £8,000 Msc Strategy and Innovation (new from Oct 2013) £8,000 Msc Finance (new from Oct 2013) £8,500 Msc Risk and Finance (new from Oct 2013) £8,500 MSC Project Management(new from Oct 2013) £8,000 Law in Public Health Practice (non professional) lower fee £5,700 MSc Leadership & Management in Health & Social

  10. Geologic and geotechnical assessment RFETS Building 371, Rocky Flats, Colorado

    SciTech Connect (OSTI)

    Maryak, M.E.; Wyatt, D.E.; Bartlett, S.F.; Lewis, M.R.; Lee, R.C.

    1995-12-13T23:59:59.000Z

    This report describes the review and evaluation of the geological, geotechnical and geophysical data supporting the design basis analysis for the Rocky Flats Environmental Test Site (RFETS) Building 371. The primary purpose of the geologic and geotechnical reviews and assessments described herein are to assess the adequacy of the crustal and near surface rock and soil model used in the seismic analysis of Building 371. This review was requested by the RFETS Seismic Evaluation Program. The purpose was to determine the adequacy of data to support the design basis for Building 371, with respect to seismic loading. The objectives required to meet this goal were to: (1) review techniques used to gather data (2) review analysis and interpretations of the data; and (3) make recommendations to gather additional data if required. Where there were questions or inadequacies in data or interpretation, recommendations were made for new data that will support the design basis analysis and operation of Building 371. In addition, recommendations are provided for a geologic and geophysical assessment for a new facility at the Rocky Flats Site.

  11. Tiger Team Assessment of the Pantex Plant, Amarillo, Texas

    SciTech Connect (OSTI)

    Not Available

    1990-02-01T23:59:59.000Z

    This document contains the findings and associated root causes identified during the Tiger Team Assessment of the Department of Energy's (DOE) Pantex Plant in Amarillo, Texas. This assessment was conducted by the Department's Office of Environment, Safety and Health between October 2 and 31, 1989. The scope of the assessment of the Pantex Plant covered all areas of environment, safety and health (ES H) activities, including compliance with federal, state, and local regulations, requirements, permits, agreements, orders and consent decrees, and DOE ES H Orders. The assessment also included an evaluation of the adequacy of DOE and site contractor ES H management programs. The draft findings were submitted to the Office of Defense Programs, the Albuquerque Operations Office, the Amarillo Area Office, and regulatory agencies at the conclusion of the on-site assessment activities for review and comment on technical accuracy. Final modifications and any other appropriate changes have been incorporated in the final report. The Tiger Team Assessment of the Pantex Plant is part of the larger Tiger Team Assessment program which will encompass over 100 DOE operating facilities. The assessment program is part of a 10-point initiative announced by Secretary of Energy James D. Watkins on June 27, 1989, to strengthen environmental protection and waste management activities in the Department. The results of the program will provide the Secretary with information on the compliance status of DOE facilities with regard to ES H requirements, root causes for noncompliance, adequacy of DOE and site contractor ES H management programs, and DOE-wide ES H compliance trends.

  12. What is greener than a VMT tax? The case for an indexed energy user fee to finance us surface transportation

    SciTech Connect (OSTI)

    Greene, David L [ORNL

    2011-01-01T23:59:59.000Z

    Highway finance in the United States is perceived by many to be in a state of crisis, primarily due to the erosion of motor fuel tax revenues due to inflation, fuel economy improvement, increased use of alternative sources of energy and diversion of revenues to other purposes. Monitoring vehicle miles of travel (VMT) and charging highway users per mile has been proposed as a replacement for the motor fuel tax. A VMT user fee, however, does not encourage energy efficiency in vehicle design, purchase and operation, as would a user fee levied on all forms of commercial energy used for transportation and indexed to the average efficiency of vehicles on the road and to inflation. An indexed roadway user toll on energy (IRoUTE) would induce two to four times as much reduction in greenhouse gas (GHG) emissions and petroleum use as a pure VMT user fee. However, it is not a substitute for pricing GHG emissions and would make only a small but useful contribution to reducing petroleum dependence. An indexed energy user fee cannot adequately address the problems of traffic congestion and heavy vehicle cost responsibility. It could, however, be a key component of a comprehensive system of financing surface transportation that would eventually also include time and place specific monitoring of VMT for congestion pricing, externality charges and heavy vehicle user fees.

  13. A Methodology for assessing Agile Software Development Approaches

    E-Print Network [OSTI]

    Soundararajan, Shvetha

    2011-01-01T23:59:59.000Z

    Agile methods provide an organization or a team the flexibility to adopt a selected subset of principles and practices based on their culture, their values, and the types of systems that they develop. More specifically, every organization or team implements a customized agile method, tailored to better accommodate its needs. However, the extent to which a customized method supports the organizational objectives, or rather the 'goodness' of that method is questionable. Existing agile assessment approaches focus on a comparative analysis, or are limited in scope and application. In this research, we propose a structured, systematic and comprehensive approach to assess the 'goodness' of agile methods. We examine an agile method based on (1) its adequacy, (2) the capability of the organization to support the adopted principles and practices specified by the method, and (3) the method's effectiveness. We propose the Objectives, Principles and Practices (OPP) Framework to guide our assessment. The Framework identif...

  14. Computer Graphic Design Fees Scholarship R E G U L A T I O N S F O R 2 0 1 5

    E-Print Network [OSTI]

    Waikato, University of

    Computer Graphic Design Fees Scholarship R E G U L A T I O N S F O R 2 0 1 5 BACKGROUND This Scholarship was established in 2009 by the Faculty of Computing and Mathematical Sciences. REGULATIONS 1. The Scholarship will be known as the Computer Graphic Design Fees Scholarship. 2. The Scholarship will have

  15. 32192UniprintNT11.09NJ HE105 Updated November 2013 Controlled by Coordinator Higher Education Enrolments & Fees PAGE 1 of 1

    E-Print Network [OSTI]

    32192UniprintNT11.09NJ HE105 Updated November 2013 · Controlled by Coordinator Higher Education Enrolments & Fees PAGE 1 of 1 Higher Education Employer Authorisation Form Higher Education to withdraw this contract, for any reason, during 2014. Higher Education Fees are subject to the Higher

  16. The FY 1998 Battelle performance evaluation and incentive fee agreement

    SciTech Connect (OSTI)

    Davis, T.L.

    1998-01-07T23:59:59.000Z

    Fiscal Year 1998 represents the second full year utilizing a results-oriented, performance-based contract. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractors performance for the period October 1, 1997 through September 30, 1998, as required by Articles entitled Use of Objective Standards of Performance, Self Assessment and Performance Evaluation and Critical Outcomes Review of the Contract DE-AC06-76RL01830. In partnership with the Contractor and other key customers, the Department of Energy (DOE) Richland Operations Office has defined six critical outcomes that serve as the core for the Contractors performance evaluation. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory. The Critical Outcome system focuses all of the customer desires into specific objectives and performance indicators, with supporting measures to track and foster continued improvement in meeting the needs (outcomes) of the Laboratory`s customers. Section 1 provides information on how the overall performance rating for the Contractor will be determined. Section 2 provides the detailed information concerning critical outcomes, objectives, performance indicators and expectations of performance. Section 3 describes the commitments for documenting and reporting the Laboratory`s self-evaluation.

  17. FY14 AWARD FEE DETERMINATION SCORECARD Contractor: Wastren-EnergX Mission Support, LLC.

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd of YearFLASH2011-17-OPAMDepartmentofofForewordinFY 2016AWARD FEE

  18. Fee Waiver and Reduction Criteria | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What'sis Taking Over OurThe Iron4 Self-Scrubbing:,,of ScienceCurrentEmergencyU.S.U.S. DOE Office ofFee

  19. File:Geothermal fee schedule 08-08-10.pdf | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump to: navigation,SizeEthiopiametst 226.pdf:08, 15Geothermal fee schedule

  20. Environmental Management Assessment of the National Renewable Energy Laboratory (NREL)

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    This report documents the results of the environmental management assessment performed at the National Renewable Energy Laboratory (NREL) in Golden, Colorado. The onsite portion of the assessment was conducted from September 14 through September 27, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). During this assessment, the activities conducted by the assessment team included reviews of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and NREL contractor personnel; and inspections and observations of selected facilities and operations. The environmental management assessment of NREL focused on the adequacy of environmental management systems and assessed the formality of programs employing an approach that recognizes the level of formality implementing environmental programs may vary commensurate with non-nuclear research and development operations. The Assessment Team evaluated environmental monitoring, waste management and National Environmental Policy Act (NEPA) activities at NREL, from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section of this report. The scope of the NREL Environmental Management Assessment was comprehensive and included all areas of environmental management. At the same time, environmental monitoring, waste management, and NEPA activities were evaluated to develop a programmatic understanding of these environmental disciplines, building upon the results of previous appraisals, audits, and reviews performed at the NREL.

  1. Environment, Safety and Health Progress Assessment of the Hanford Site

    SciTech Connect (OSTI)

    Not Available

    1992-05-01T23:59:59.000Z

    This report documents the result of the US Department of Energy (DOE) Environment, Safety and Health (ES&H) Progress Assessment of the Hanford Site, in Richland, Washington. The assessment, which was conducted from May 11 through May 22, 1992, included a selective-review of the ES&H management systems and programs of the responsible DOE Headquarters Program Offices the DOE Richland Field Office, and the site contractors. The ES&H Progress Assessments are part of the Secretary of Energy`s continuing effort to institutionalize line management accountability and the self-assessment process throughout DOE and its contractor organizations. The purpose of the Hanford Site ES&H Progress Assessment is to provide the Secretary with an independent assessment of the adequacy and effectiveness of the DOE and contractor management structures, resources, and systems to address ES&H problems and requirements. They are not intended to be comprehensive compliance assessments of ES&H activities. The point of reference for assessing programs at the Hanford Site was, for the most part, the Tiger Team Assessment of the Hanford Site, which was conducted from May 21 through July 18, 1990. A summary of issues and progress in the areas of environment, safety and health, and management is included.

  2. A Structured Framework for Assessing the "Goodness" of Agile Methods

    E-Print Network [OSTI]

    Soundararajan, Shvetha

    2010-01-01T23:59:59.000Z

    Agile Methods are designed for customization; they offer an organization or a team the flexibility to adopt a set of principles and practices based on their culture and values. While that flexibility is consistent with the agile philosophy, it can lead to the adoption of principles and practices that can be sub-optimal relative to the desired objectives. We question then, how can one determine if adopted practices are "in sync" with the identified principles, and to what extent those principles support organizational objectives? In this research, we focus on assessing the "goodness" of an agile method adopted by an organization based on (1) its adequacy, (2) the capability of the organization to provide the supporting environment to competently implement the method, and (3) its effectiveness. To guide our assessment, we propose the Objectives, Principles and Practices (OPP) framework. The design of the OPP framework revolves around the identification of the agile objectives, principles that support the achiev...

  3. 7.15.09, Page 1 of 1 What You Should Know about Tuition and Fees in 2009-10

    E-Print Network [OSTI]

    Karsai, Istvan

    at ETSU in 2009-10? Starting this fall, ETSU and all other Tennessee Board of Regents institutions other fees will students pay in 2009-10? In addition to tuition, students will pay ETSU's program will owe this fall? You can use ETSU's tuition calculator to determine your costs this fall based

  4. Program 2015 Date Regular Fee Registration Dates EMC in Residence May 3-8 $780 Feb. 3 Apr. 10, 2015

    E-Print Network [OSTI]

    Ellis, Randy

    Program 2015 Date Regular Fee Registration Dates EMC in Residence May 3-8 $780 Feb. 3 Apr. 10, 2015 2015 EMC Residence Program The Enrichment Mini-Course (EMC) Residential Program is an opportunity, and participate in extra- curricular activities. Why EMC at Queen's? Take top quality academic courses taught

  5. Program 2014 Date Regular Fee Registration Dates EMC in Residence May 4-9 $650 Feb 3-28, 2014

    E-Print Network [OSTI]

    Abolmaesumi, Purang

    Program 2014 Date Regular Fee Registration Dates EMC in Residence May 4-9 $650 Feb 3-28, 2014 2014 EMC Residence Program The Enrichment Mini-Course (EMC) Residential Program is an opportunity and dinner each day in the cafeteria, and participate in extra-curricular activities. Why EMC at Queen

  6. Econometrics of Models with Strategic Interaction Presenter: Elie Tamer (Northwestern) Fee: HE delegates: 90; other delegates: 720

    E-Print Network [OSTI]

    Saunders, Mark

    Econometrics of Models with Strategic Interaction Presenter: Elie Tamer (Northwestern) Fee: HE of the econometrics questions that arise when analyzing models with multiple decision makers interacting a set of econometric theorists, applied economists and economic theorists that will share their views

  7. Assessment of light water reactor fuel damage during a reactivity initiated accident

    SciTech Connect (OSTI)

    MacDonald, P.E.; Seiffert, S.L.; Martinson, Z.R.; McCardell, R.K.; Owen, D.E.; Fukuda, S.K.

    1980-01-01T23:59:59.000Z

    This paper presents an assessment of LWR fuel damage during a reactivity initiated accident and comments on the adequacy of the present USNRC design requirements. Results from early SPERT tests are reviewed and compared with results from recent computer simulations and PBF tests. A progression of fuel rod and cladding damage events is presented. High strain rate deformation of relatively cool irradiated cladding early in the transient may result in fracture at a radial average peak fuel enthalpy of approximately 140 cal/g UO/sub 2/. Volume expansion of previously irradiated fuel upon melting may cause deformation and rupture of the cladding, and coolant channel blockage at higher peak enthalpies.

  8. PROGRESS REPORT ON RESOURCE ADEQUACY

    E-Print Network [OSTI]

    Anthony D'Aquila, Steven Endo Pittsburg, City of Vanessa Xie Plumas-Sierra Rural Electric Cooperative Judy Valley Power Mike Pretto, Thai-Hoa Tran Surprise Valley Electrification Corporation Jim Hays Trinity

  9. FOIA FEES

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 Russian NuclearandJunetrackEllen|JulyR--FOIA Support Services for the

  10. Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1993-07-01T23:59:59.000Z

    This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP`s environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence.

  11. Changing Patterns of Rangeland Use: Functional Characteristics of the Economics and Operations of Fee Hunting Enterprises in Central and South Texas

    E-Print Network [OSTI]

    Sultenfuss, Sherry D.

    2010-07-14T23:59:59.000Z

    Ranching communities in Texas have long recognized fee hunting as a natural resource with the potential of directly affecting agricultural incomes. Hunting as an industry today, appears to be developing into an economic substitute for Texas ranchers...

  12. Tiger Team assessment of the Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Not Available

    1991-08-01T23:59:59.000Z

    This report documents the Tiger Team Assessment of the Idaho National Engineering Laboratory (INEL) located in Idaho Falls, Idaho. INEL is a multiprogram, laboratory site of the US Department of Energy (DOE). Overall site management is provided by the DOE Field Office, Idaho; however, the DOE Field Office, Chicago has responsibility for the Argonne National Laboratory-West facilities and operations through the Argonne Area Office. In addition, the Idaho Branch Office of the Pittsburgh Naval Reactors Office has responsibility for the Naval Reactor Facility (NRF) at the INEL. The assessment included all DOE elements having ongoing program activities at the site except for the NRF. In addition, the Safety and Health Subteam did not review the Westinghouse Idaho Nuclear Company, Inc. facilities and operations. The Tiger Team Assessment was conducted from June 17 to August 2, 1991, under the auspices of the Office of Special Projects, Office of the Assistant Secretary for Environment, Safety and Health, Headquarters, DOE. The assessment was comprehensive, encompassing environmental, safety, and health (ES H) disciplines; management; and contractor and DOE self-assessments. Compliance with applicable federal, state, and local regulations; applicable DOE Orders; best management practices; and internal INEL site requirements was assessed. In addition, an evaluation of the adequacy and effectiveness of the DOE and the site contractors management of ES H/quality assurance programs was conducted.

  13. Tiger Team assessment of the Brookhaven National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1990-06-01T23:59:59.000Z

    This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment conducted at Brookhaven National Laboratory (BNL) in Upton, New York, between March 26 and April 27, 1990. The BNL is a multiprogram laboratory operated by the Associated Universities, Inc., (AUI) for DOE. The purpose of the assessment was to provide the status of environment, safety, and health (ES H) programs at the Laboratory. The scope of the assessment included a review of management systems and operating procedures and records; observations of facility operations; and interviews at the facilities. Subteams in four areas performed the review: ES H, Occupational Safety and Health, and Management and Organization. The assessment was comprehensive, covering all areas of ES H activities and waste management operations. Compliance with applicable Federal, State, and local regulations; applicable DOE Orders; and internal BNL requirements was assessed. In addition, the assessment included an evaluation of the adequacy and effectiveness of the DOE and the site contractor, Associated Universities, Inc. (AUI), management, organization, and administration of the ES H programs at BNL.

  14. An Approach for Assessing Structural Uplifting Using Blast Motions.

    SciTech Connect (OSTI)

    Nie,J.; Xu, J.; Hofmayer, C.; Ali, S.

    2008-06-01T23:59:59.000Z

    The simplified methods in current codes for determining the shear capacity of reinforced concrete shear walls had mostly been validated using the test results of single-element shear walls. Recently available JNES/NUPEC test data of reinforced concrete shear walls under multi-directional cyclic loadings provided a unique opportunity to investigate the adequacy of the simplified methods for use in situations with strong interaction effects. A total of 11 test specimens with aspect ratios between 0.47 and 0.87 have been used in the assessment. Two simplified methods from the ACI 349-01 standard [1] and one from the ASCE 43-05 standard [2] have been evaluated. This paper also presents the development of an adjustment factor to consider the aspect ratio and the development of two approaches to consider interaction effects for one of the simplified methods. It concludes with the insights on the applicability of the code methods when interaction effects exist.

  15. Environment, Safety and Health progress assessment of the Idaho National Engineering Laboratory (INEL)

    SciTech Connect (OSTI)

    Not Available

    1993-08-01T23:59:59.000Z

    The ES&H Progress Assessments are part of the Department`s continuous improvement process throughout DOE and its contractor organizations. The purpose of the INEL ES&H Progress Assessment is to provide the Department with concise independent information on the following: (1) change in culture and attitude related to ES&H activities; (2) progress and effectiveness of the ES&H corrective actions resulting from previous Tiger Team Assessments; (3) adequacy and effectiveness of the ES&H self-assessment programs of the DOE line organizations and the site management and operating contractor; and (4) effectiveness of DOE and contractor management structures, resources, and systems to effectively address ES&H problems. It is not intended that this Progress Assessment be a comprehensive compliance assessments of ES&H activities. The points of reference for assessing programs at the INEL were, for the most part, the 1991 INEL Tiger Team Assessment, the INEL Corrective Action Plan, and recent appraisals and self-assessments of INEL. Horizontal and vertical reviews of the following programmatic areas were conducted: Management: Corrective action program; self-assessment; oversight; directives, policies, and procedures; human resources management; and planning, budgeting, and resource allocation. Environment: Air quality management, surface water management, groundwater protection, and environmental radiation. Safety and Health: Construction safety, worker safety and OSHA, maintenance, packaging and transportation, site/facility safety review, and industrial hygiene.

  16. An assessment of simplified methods to determine damage from ship-to-ship collisions

    SciTech Connect (OSTI)

    Parks, M.B.; Ammerman, D.J.

    1996-02-01T23:59:59.000Z

    Sandia National Laboratories (SNL) is studying the safety of shipping, radioactive materials (RAM) by sea, the SeaRAM project (McConnell, et al. 1995), which is sponsored by the US Department of Energy (DOE). The project is concerned with the potential effects of ship collisions and fires on onboard RAM packages. Existing methodologies are being assessed to determine their adequacy to predict the effect of ship collisions and fires on RAM packages and to estimate whether or not a given accident might lead to a release of radioactivity. The eventual goal is to develop a set of validated methods, which have been checked by comparison with test data and/or detailed finite element analyses, for predicting the consequences of ship collisions and fires. These methods could then be used to provide input for overall risk assessments of RAM sea transport. The emphasis of this paper is on methods for predicting- effects of ship collisions.

  17. Developing and evaluating distributions for probabilistic human exposure assessments

    SciTech Connect (OSTI)

    Maddalena, Randy L.; McKone, Thomas E.

    2002-08-01T23:59:59.000Z

    This report describes research carried out at the Lawrence Berkeley National Laboratory (LBNL) to assist the U. S. Environmental Protection Agency (EPA) in developing a consistent yet flexible approach for evaluating the inputs to probabilistic risk assessments. The U.S. EPA Office of Emergency and Remedial Response (OERR) recently released Volume 3 Part A of Risk Assessment Guidance for Superfund (RAGS), as an update to the existing two-volume set of RAGS. The update provides policy and technical guidance on performing probabilistic risk assessment (PRA). Consequently, EPA risk managers and decision-makers need to review and evaluate the adequacy of PRAs for supporting regulatory decisions. A critical part of evaluating a PRA is the problem of evaluating or judging the adequacy of input distributions PRA. Although the overarching theme of this report is the need to improve the ease and consistency of the regulatory review process, the specific objectives are presented in two parts. The objective of Part 1 is to develop a consistent yet flexible process for evaluating distributions in a PRA by identifying the critical attributes of an exposure factor distribution and discussing how these attributes relate to the task-specific adequacy of the input. This objective is carried out with emphasis on the perspective of a risk manager or decision-maker. The proposed evaluation procedure provides consistency to the review process without a loss of flexibility. As a result, the approach described in Part 1 provides an opportunity to apply a single review framework for all EPA regions and yet provide the regional risk manager with the flexibility to deal with site- and case-specific issues in the PRA process. However, as the number of inputs to a PRA increases, so does the complexity of the process for calculating, communicating and managing risk. As a result, there is increasing effort required of both the risk professionals performing the analysis and the risk manager reviewing it. For deterministic risk assessments, the use of default inputs has improved the ease and the consistency of both performing and reviewing assessments. By analogy, it is expected that similar advantage will be seen in the field of probabilistic risk assessment through the introduction of default distributions. In Part 2 of this report, we consider when a default distribution might be appropriate for use in PRA and work towards development of recommended task-specific distributions for several frequently used exposure factors. An approach that we develop using body weight and exposure duration as case studies offers a transparent way for developing task-specific exposure factor distributions. A third case study using water intake highlights the need for further study aimed at improving the relevance of ''short-term'' data before recommendations on task-specific distributions of water intake can be made.

  18. Assessment Documents

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - March 2015

    The Office of Nuclear Safety and Environmental...

  19. Evaluation of Chemical Warfare Agent Percutaneous Vapor Toxicity: Derivation of Toxicity Guidelines for Assessing Chemical Protective Ensembles.

    SciTech Connect (OSTI)

    Watson, A.P.

    2003-07-24T23:59:59.000Z

    Percutaneous vapor toxicity guidelines are provided for assessment and selection of chemical protective ensembles (CPEs) to be used by civilian and military first responders operating in a chemical warfare agent vapor environment. The agents evaluated include the G-series and VX nerve agents, the vesicant sulfur mustard (agent HD) and, to a lesser extent, the vesicant Lewisite (agent L). The focus of this evaluation is percutaneous vapor permeation of CPEs and the resulting skin absorption, as inhalation and ocular exposures are assumed to be largely eliminated through use of SCBA and full-face protective masks. Selection of appropriately protective CPE designs and materials incorporates a variety of test parameters to ensure operability, practicality, and adequacy. One aspect of adequacy assessment should be based on systems tests, which focus on effective protection of the most vulnerable body regions (e.g., the groin area), as identified in this analysis. The toxicity range of agent-specific cumulative exposures (Cts) derived in this analysis can be used as decision guidelines for CPE acceptance, in conjunction with weighting consideration towards more susceptible body regions. This toxicity range is bounded by the percutaneous vapor estimated minimal effect (EME{sub pv}) Ct (as the lower end) and the 1% population threshold effect (ECt{sub 01}) estimate. Assumptions of exposure duration used in CPE certification should consider that each agent-specific percutaneous vapor cumulative exposure Ct for a given endpoint is a constant for exposure durations between 30 min and 2 hours.

  20. Employment of volume-based user fees in rural drop-off collection systems for solid waste: Six case studies

    SciTech Connect (OSTI)

    Park, W.M.

    1995-09-01T23:59:59.000Z

    While volume-based user fees (VBUFs) may not be the most appropriate financing strategy for all rural areas, the experience of these rural counties and towns warrants the following inclusions. Implementation of VBUFs in a rural drop-off context appears feasible across a wide range of geographic and demographic conditions, as well as a wide range of system characteristics, without prohibitive administrative problems or costs. Most residents appear willing to support (or at least accept) VBUFs if they are well-informed of the need and logic in advance, and given reasonable options for gaining some measure of control over their total bill. Hybrid financing strategies allow per bag fees to be kept at modest levels. Support comes more easily if VBUFs are initiated at the time of a significant enhancement of the collection system. VBUFs within rural drop-off collection systems appear capable of motivating relatively high levels of participation in the separation of recyclables, and thus contributing to relatively high per capita generation rates for typical recyclables and county-wide diversion or recovery rates. At least minor problems with increased illegal dumping and burning can be expected, but a show of willingness to enforce ordinances against such practices can lead to fairly quick subsidence.

  1. Consequence Assessment

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21T23:59:59.000Z

    This volume focuses on the process of performing timely initial assessments necessary to support critical first decisions and the continuous process of refining those initial assessments as more information and resources become available. Canceled by DOE G 151.1-4.

  2. Please return to: 1910 University Drive Boise, ID 83725-1265 Phone: 208-426-1616 Fax: 208-426-3100 Revised: 5/21/14, Page 1 of 2

    E-Print Network [OSTI]

    Barrash, Warren

    of the fee waiver. HRS does not make the determination as to which courses are eligible for the fee waiver WITH WAIVER OF FEES $50.00 LATE FEE ASSESSED FOR FEE WAIVERS RECEIVED AFTER THE DEADLINE Fee Waiver Deadlines Time of Class (MWF 11:40-12:30) *Complete a separate fee waiver for each institution you are attending

  3. Environment, Safety and Health Progress Assessment of the Argonne Illinois Site

    SciTech Connect (OSTI)

    Not Available

    1993-11-01T23:59:59.000Z

    This report documents the results of the US Department of Energy (DOE) Environment, Safety and Health (ES&H) Progress Assessment of the Argonne Illinois Site (AIS), near Chicago, Illinois, conducted from October 25 through November 9, 1993. During the Progress Assessment, activities included a selective review of the ES&H management systems and programs with principal focus on the DOE Office of Energy Research (ER); CH, which includes the Argonne Area Office; the University of Chicago; and the contractor`s organization responsible for operation of Argonne National Laboratory (ANL). The ES&H Progress Assessments are part of DOE`s continuing effort to institutionalize line management accountability and the self-assessment process throughout DOE and its contractor organizations. The purpose of the AIS ES&H Progress Assessment was to provide the Secretary of Energy, senior DOE managers, and contractor management with concise independent information on the following: change in culture and attitude related to ES&H activities; progress and effectiveness of the ES&H corrective actions resulting from the previous Tiger Team Assessment; adequacy and effectiveness of the ES&H self-assessment process of the DOE line organizations, the site management, and the operating contractor; and effectiveness of DOE and contractor management structures, resources, and systems to effectively address ES&H problems and new ES&H initiatives.

  4. The University of Stirling Vietnam Award This award offers a fee waiver of 1,000 for the first year and 500 for years two,

    E-Print Network [OSTI]

    Little, Tony

    The University of Stirling Vietnam Award This award offers a fee waiver of 1,000 for the first-time undergraduate or postgraduate (taught or research) degree. The University of Stirling wishes to offer this award at Stirling and add to our already diverse international community on campus. Students do not have to apply

  5. Two PhD studentships Payment of Home/EU Fees and a stipend of 20,000 per annum for 3 years

    E-Print Network [OSTI]

    Two PhD studentships Payment of Home/EU Fees and a stipend of 20,000 per annum for 3 years We are offering two PhD studentships in improvement science. The first PhD focuses upon healthcare improvement methodology and the second PhD will address quality and safety of prescribing practice. These exciting three

  6. Endowment and Gift Fee Statement A long-term goal of The Georgia Southern University Foundation 501(c)(3) is to build the institution's

    E-Print Network [OSTI]

    Hutcheon, James M.

    their operations, according to the results of a CASE survey on foundation funding sources and budget restructuring found to be underfunded in terms of operations. A major goal is to build the infrastructure needed structure to cover operations essential to the Foundation's overall operation. These fees were introduced

  7. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161

    E-Print Network [OSTI]

    Assessment Resource Planning § Adequacy Assessment = early warning should resource development fall short power supply § Adequacy assessment is a part of resource planning 5 Treatment of Market Supply Adequacy, Senior Power System Analyst SUBJECT: Assumptions used for Adequacy Assessments In December of 2011

  8. DRAFT Released for Public Comment February 14, 2008 W. Bill Booth

    E-Print Network [OSTI]

    Coordinating Council (WECC) for consideration in its assessment of West-wide resource adequacy. The term

  9. Risk Assessment

    Broader source: Energy.gov [DOE]

    A set of issues that state and local governments should carefully consider, with the goal of helping them assess and anticipate solutions for some worst case or unfortunate case scenarios as they...

  10. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    surface and the lower part of the atmosphere; this phenomenon is called the greenhouse effect. U.S. Department of Energy DOEEA-1728D Draft Environmental Assessment 32 June...

  11. Tiger Team Assessment of the Navel Petroleum and Oil Shale Reserves Colorado, Utah, and Wyoming

    SciTech Connect (OSTI)

    Not Available

    1992-07-01T23:59:59.000Z

    This report documents the Tiger Team Assessment of the Naval Petroleum Oil Shale Reserves in Colorado, Utah, and Wyoming (NPOSR-CUW). NPOSR-CUW consists of Naval Petroleum Reserve Number 3 located near Casper, Wyoming; Naval Oil Shale Reserve Number I and Naval Oil Shale Reserve Number 3 located near Rifle, Colorado; and Naval Oil Shale Reserve Number 2 located near Vernal, Utah, which was not examined as part of this assessment. The assessment was comprehensive, encompassing environment, safety, and health (ES H) and quality assurance (QA) disciplines; site remediation; facilities management; and waste management operations. Compliance with applicable Federal, state, and local regulations; applicable DOE Orders; best management practices; and internal NPOSR-CUW requirements was assessed. The NPOSR-CUW Tiger Team Assessment is part of a larger, comprehensive DOE Tiger Team Independent Assessment Program planned for DOE facilities. The objective of the initiative is to provide the Secretary with information on the compliance status of DOE facilities with regard to ES H requirements, root causes for noncompliance, adequacy of DOE and contractor ES H management programs, response actions to address the identified problem areas, and DOE-wide ES H compliance trends and root causes.

  12. PERFORMANCE ASSESSMENT ASSISTANCE ACTIVITIES IN THE DOE COMPLEX

    SciTech Connect (OSTI)

    Seitz, R.

    2012-01-23T23:59:59.000Z

    The United States Department of Energy Office of Environmental Management (DOE-EM) has established a Performance Assessment Community of Practice (PA CoP) to foster the sharing of information among performance assessment (PA) and risk assessment practitioners, regulators and oversight personnel. The general intent is to contribute to continuous improvement in the consistency, technical adequacy and quality of implementation of PAs and risk assessments around the DOE Complex. The PA CoP activities have involved commercial disposal facilities and international participants to provide a global perspective. The PA CoP has also sponsored annual technical exchanges as a means to foster improved communication and to share lessons learned from on-going modelling activities. The PA CoP encourages activities to provide programmatic and technical assistance in the form of sharing experience and lessons learned with practitioners during the development of PAs and risk assessments. This assistance complements DOE-EM reviews through the Low-Level Waste Disposal Facility Federal Review Group (LFRG) that are conducted after modelling efforts are completed. Such up-front assistance is providing additional value in terms of improving consistency and sharing of information. There has been a substantial increase in the amount of assistance being provided. The assistance has been well received by practitioners and regulators that have been involved. The paper highlights assistance and sharing of information that has been conducted in the last two years to support activities underway in support of proposed disposal facilities at Paducah, Portsmouth, and the Idaho National Laboratory and tank closure at Hanford.

  13. W. Bill Booth Bruce A. Measure

    E-Print Network [OSTI]

    of the Resource Adequacy Assessment The Northwest Resource Adequacy Standard, adopted by the Council earlier Northwest Resource Adequacy Assessment 2011 and 2013 Summary The Northwest Resource Adequacy Standard (http this year, calls for an annual assessment of the region's power supply three and five years out

  14. Preliminary Review of Safety Assessment Issues at Savannah River Site, August 2011

    SciTech Connect (OSTI)

    Napier, Bruce A.; Rishel, Jeremy P.; Bixler, Nathan E.

    2011-09-19T23:59:59.000Z

    At the request of Savannah River Nuclear Solutions (SRNS) management, a review team composed of experts in atmospheric transport modeling for environmental radiation dose assessment convened at the Savannah River Site (SRS) on August 29-30, 2011. Several issues were presented at the meeting for discussion. This is a short summary that is organized in accordance with the primary issues discussed, which is not necessarily a chronological record. Issues include: SRS Meteorological Data and its Use in MACCS2; Deposition Velocities for Particles; Deposition Velocities for Tritium; MACCS2 Dispersion Coefficients; Use of Low Surface Roughness in Open Areas; Adequacy of Meteorological Tower and Instrumentation; Displacement Height; and Validity of MACCS2 Calculations at Close-in Distances. A longer report will be issued at a later date that expands upon these topics and recommendations.

  15. Integrated Environmental Assessment Part III: Exposure Assessment

    E-Print Network [OSTI]

    McKone, Thomas E.; Small, Mitchell J.

    2006-01-01T23:59:59.000Z

    issues such as life cycle assessment (LCA) fosters the needlife-cycle impact assessment (LCIA) process within in LCA is

  16. Tiger Team assessment of the Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Goldberg, Edward S.; Keating, John J.

    1991-08-01T23:59:59.000Z

    The Management Subteam conducted a management assessment of Environment, Safety, and Health (ES H) programs and their implementation of Idaho National Engineering Laboratory (INEL). The objectives of the assessment were to: (1) evaluate the effectiveness of existing management functions and processes in terms of ensuring environmental compliance, and the health and safety of workers and the general public; and (2) identify probable root causes for ES H findings and concerns. Organizations reviewed were DOE-Headquarters: DOE Field Offices, Chicago (CH) and Idaho (ID); Argonne Area Offices, East (AAO-E) and West (AAO-W); Radiological and Environmental Sciences Laboratory (RESL); Argonne National Laboratory (ANL); EG G Idaho, Inc. (EG G); Westinghouse Idaho Nuclear Company, Inc. (WINCO); Rockwell-INEL; MK-Ferguson of Idaho Company (MK-FIC); and Protection Technology of Idaho, Inc. (PTI). The scope of the assessment covered the following ES H management issues: policies and procedures; roles, responsibilities, and authorities; management commitment; communication; staff development, training, and certification; recruitment; compliance management; conduct of operations; emergency planning and preparedness; quality assurance; self assessment; oversight activities; and cost plus award fee processes.

  17. Annual Summary of Immobilized Low Activity Tank Waste (ILAW) Performance Assessment

    SciTech Connect (OSTI)

    MANN, F M

    2000-05-01T23:59:59.000Z

    As required by the Department of Energy (DOE) order on radioactive waste management (DOE 1999a) as implemented by the Maintenance Plan for the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (Mann 2000a), an annual summary of the adequacy of the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (ILAW PA) must be submitted to DOE headquarters each year that a performance assessment is not submitted. Considering the results of data collection and analysis, the conclusions of the 1998 version of the ILAW PA (Mann 1998) as conditionally approved (DOE 1999b) remain valid, but new information indicates more conservatism in the results than previously estimated. A white paper (Mann 2000b) is attached as Appendix A to justify this statement. Recent ILAW performance estimates used on the waste form and geochemical data have resulted in increased confidence that the disposal of ILAW will meet performance objectives. The ILAW performance assessment program will continue to interact with science and technology activities, disposal facility design staff, and operations, as well as to continue to collect new waste form and disposal system data to further increase the understanding of the impacts of the disposal of ILAW. The next full performance assessment should be issued in the spring of 2001.

  18. Report on Audit of Department of Energy Management and Operating Contractor Available Fees, IG-0390

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptemberAssessments | Department ofSouthernof theServiceJune 6,8,

  19. Assessment Documents

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you0 ARRA NewslettersPartnership of theArctic Energy Summit26 Assessment

  20. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8, 2000ConsumptionInnovationEnvironment,682 Environmental Assessment

  1. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8, 2000ConsumptionInnovationEnvironment,682 Environmental Assessment 728D

  2. Environmental Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8, 2000ConsumptionInnovationEnvironment,682 Environmental Assessment

  3. Performance Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeeding accessPeptoid Nanosheets Offer a Diversity ofPerformance assessment

  4. Ecological Risk Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ecological Risk Assessments Ecological Risk Assessments Ecological risk assessment is the appraisal of potential adverse effects of exposure to contaminants on plants and animals....

  5. Resource Adequacy Standard for the Pacific Northwest

    E-Print Network [OSTI]

    .................................................................................................... 11 Expected Unserved Energy to regional utilities. The new standard maintains the 2008 philosophy that a reasonable amount of market will include information about the frequency, duration, size and timing of potential shortfalls. It will also

  6. Resource Adequacy Capacity - Power Marketing - Sierra Nevada...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to SMUD's Questions at PCF (05-09-07) (Word - 28K) Western Contracts w Customers - SNR Coral RA Contract (PDF - 295K) - SNR PG&E RA Contract (PDF - 399K) Comments on Western's...

  7. Chapter 4 Transmission Adequacy | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'sEnergyTexas1. Feedstock & Production ChallengeEfficient Future4

  8. Western Resource Adequacy: Challenges - Approaches - Metrics | Department

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradley Nickell DirectorThe&Management Alert Western AreaIn

  9. Assessor Training Assessment Techniques

    E-Print Network [OSTI]

    NVLAP Assessor Training Assessment Techniques: Communication Skills and Conducting an Assessment listener Knowledgeable Assessor Training 2009: Assessment Techniques: Communication Skills & Conducting, truthful, sincere, discrete Diplomatic Decisive Selfreliant Assessor Training 2009: Assessment

  10. Flibe assessments.

    SciTech Connect (OSTI)

    Sze, D. K.; McCarthy, K.; Sawan, M.; Tillack, M.; Ying, A.; Zinkle, S.

    2000-11-15T23:59:59.000Z

    An assessment of the issues on using flibe for fusion applications has been made. It is concluded that sufficient tritium breeding can be achieved for a flibe blanket, especially if a few cm of Be is include in the blanket design. A key issue is the control of the transmutation products such as TF and F{sub 2}. A REDOX (Reducing-Oxidation) reaction has to be demonstrated which is compatible to the blanket design. Also, MHD may have strong impact on heat transfer if the flow is perpendicular to the magnetic field. The issues associated with the REDOX reaction and the MHD issues have to be resolved by both experimental program and numerical solutions.

  11. Assessment 101: The Assessment Cycle, Clear and

    E-Print Network [OSTI]

    Su, Xiao

    Assessment 101: The Assessment Cycle, Clear and Simple October 1, 2014 Kellogg West Conference Center, Pomona, CA Resource Binder #12;2014-2015 WASC Senior College and University Commission is pleased expectations. Assessment 101: The Assessment Cycle, Clear and Simple October 1, 2014. Kellogg West, Pomona, CA

  12. Methods of right-of-way acquisition used by the Texas Highway Department

    E-Print Network [OSTI]

    Lowry, Paul Russell

    1959-01-01T23:59:59.000Z

    OF APPRAISERS. XXII. WHEN SHOULD APPRAISAL FEES BE PAID FOR CONPLETED vi Page 48 56 57 57 vii LIST OP FIGURES FIGURE 1. TEXAS HIGHWAY DEPARTHNHT Right-of-Way Division Organization Chart 2. Right-of-Way Acquisition HIGHWAY DEPAETNEHT AND OTHER... of appraisal after assignsmnt. 3. The desirability of the various means of assigning parcels of appraisal ~ 4. The adequacy of msp and other inforsmtion provided the appraiser by the Texas Highway Department. 5. The adequacy of fees paid to appraisers...

  13. Performance Assessment Assistance Activities in the DOE Complex - 12325

    SciTech Connect (OSTI)

    Seitz, Roger R.; Phifer, Mark A. [Savannah River National Laboratory, Savannah River Site, Bldg 773-43A, Aiken, SC 29808 (United States); Letourneau, Martin J. [U.S. Department of Energy, EM-41 19901 Germantown Road, Germantown, MD 20874-1290 (United States)

    2012-07-01T23:59:59.000Z

    The United States Department of Energy Office of Environmental Management (DOE-EM) has established a Performance Assessment Community of Practice (PA CoP) to foster the sharing of information among performance assessment (PA) and risk assessment practitioners, regulators and oversight personnel. The general intent is to contribute to continuous improvement in the consistency, technical adequacy and quality of implementation of PAs and risk assessments around the DOE Complex. The PA CoP activities have involved commercial disposal facilities and international participants to provide a global perspective. The PA CoP has also sponsored annual technical exchanges as a means to foster improved communication and to share lessons learned from on-going modelling activities. The PA CoP encourages activities to provide programmatic and technical assistance in the form of sharing experience and lessons learned with practitioners during the development of PAs and risk assessments. This assistance complements DOE-EM reviews through the Low-Level Waste Disposal Facility Federal Review Group (LFRG) that are conducted after modelling efforts are completed. Such up-front assistance is providing additional value in terms of improving consistency and sharing of information. There has been a substantial increase in the amount of assistance being provided. The assistance has been well received by practitioners and regulators that have been involved. The paper highlights assistance and sharing of information that has been conducted in the last two years to support activities underway in support of proposed disposal facilities at Paducah, Portsmouth, and the Idaho National Laboratory and tank closure at Hanford. DOE-EM established the PA CoP to help improve the consistency and quality of implementation of modelling activities around the DOE Complex. The PA CoP has sponsored annual technical exchanges as a means to foster improved communication and to share lessons learned from ongoing modelling activities. Practitioners; project managers; oversight personnel; and regulators from United States and international facilities have participated in the three technical exchanges that have been held to date. At the working level, the PA CoP has sponsored technical assistance in support of modelling activities that are currently underway. The assistance concept provides a means to share specific experience, good practices, and lessons learned on topics of interest at a given site while the modelling is being conducted. Such up-front assistance complements the sharing of information that occurs via regular LFRG meetings and independent LFRG reviews that are conducted when the modelling effort is completed. Examples from assistance activities that have been conducted at Idaho, Paducah, Portsmouth and Hanford were highlighted in this paper. There were differences in the types of assistance provided at each site. In some cases the assistance was focused on technical support for the practitioners and management responsible for the development of the PAs. At other sites, the assistance included working with the developers and regulators/stakeholders involved in the process to help with reaching consensus on critical assumptions. Such interactions have proven to be very effective to help all parties get a chance to discuss their perspectives and better understand the different points of view. In all cases, the assistance was used as a means to share broader perspectives, experiences and lessons learned with personnel engaged in a modelling activities at a given site. The combination of technical exchanges and targeted technical assistance has provided additional means to encourage the sharing of information around the DOE Complex and globally. Feedback from practitioners, oversight personnel, regulators and stakeholders that have been involved has been overwhelmingly positive. It is believed that such sharing of information and experiences is contributing to continuous improvement in the consistency, technical adequacy, and quality of modelling activities. Alt

  14. Strategic Plan Environmental Assessment

    E-Print Network [OSTI]

    Strategic Plan Environmental Assessment 2009 Clinical Center National Institutes of Health U Institutes of Health Strategic Plan Environmental Assessment 2009 Contents Executive Summary environmental assessment to determine Clinical Center strengths, weaknesses, opportunities, and threats

  15. Environmental assessment for the Strategic Petroleum Reserve Big Hill facility storage of commercial crude oil project, Jefferson County, Texas

    SciTech Connect (OSTI)

    NONE

    1999-03-01T23:59:59.000Z

    The Big Hill SPR facility located in Jefferson County, Texas has been a permitted operating crude oil storage site since 1986 with benign environmental impacts. However, Congress has not authorized crude oil purchases for the SPR since 1990, and six storage caverns at Big Hill are underutilized with 70 million barrels of available storage capacity. On February 17, 1999, the Secretary of Energy offered the 70 million barrels of available storage at Big Hill for commercial use. Interested commercial users would enter into storage contracts with DOE, and DOE would receive crude oil in lieu of dollars as rental fees. The site could potentially began to receive commercial oil in May 1999. This Environmental Assessment identified environmental changes that potentially would affect water usage, power usage, and air emissions. However, as the assessment indicates, changes would not occur to a major degree affecting the environment and no long-term short-term, cumulative or irreversible impacts have been identified.

  16. Terrestrial vertebrate fauna surveys for the preparation of environmental impact assessments; how can we do it better? A Western Australian example

    SciTech Connect (OSTI)

    Thompson, Graham G. [Centre for Ecosystem Management, Edith Cowan University, Joondalup Dr., Joondalup, Western Australia 6010 (Australia)]. E-mail: g.thompson@ecu.edu.au

    2007-01-15T23:59:59.000Z

    The Western Australian Environmental Protection Authority (EPA) in 2002 released Position Statement, No. 3, Terrestrial Biological Surveys as an Element of Biodiversity Protection outlining how terrestrial fauna survey data are to be used and interpreted in the preparation of environmental impact assessments (EIA). In 2004, the EPA released its Guidance for the Assessment of Environmental Factors, Terrestrial Fauna Surveys for Environmental Impact Assessment in Western Australia, No. 56. This paper briefly assesses the adequacy of recent terrestrial fauna surveys undertaken to support publicly released EIAs and indicates that the EPA is not always adhering to its own position and guidance statements. This paper argues that the current fauna survey guidelines are in need of improvement. The approach and requirements of some other Australian states are briefly assessed to identify similarities and where improvements can be made to the Western Australian (WA) guidelines. This paper concludes with suggestions on how the process and the guidelines in WA can be revised to more adequately assess the impact of developments on terrestrial vertebrate biodiversity and ecosystem function. These suggestions may have relevance for other areas where fauna surveys are undertaken to support EIAs.

  17. ORISE: Hazard Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    assesses both chemical and radiation exposures, and conducts both internal and external radiation dose assessments. Our capabililities include: Linkage of exposure data to site...

  18. Solar radiation resource assessment

    SciTech Connect (OSTI)

    Not Available

    1990-11-01T23:59:59.000Z

    The bulletin discusses the following: introduction; Why is solar radiation resource assessment important Understanding the basics; the solar radiation resource assessment project; and future activities.

  19. UC's Blue and Gold Opportunity Plan will cover your educational and student services fees with a combination of grants and scholarships, if you are a California resident whose family earns less than

    E-Print Network [OSTI]

    Grether, Gregory

    UC's Blue and Gold Opportunity Plan will cover your educational and student services fees,000 and if you qualify for financial aid. Blue and Gold Opportunity Plan will cover $12,192 for 2011-12 and $12 in an academic year term. Blue and Gold Plan does not extend to summer months. Meet basic, non

  20. INTRAMURAL SPORTS TEAM REGISTRATION FORM To register your team, fill in the top portion of this form completely and bring it to the IM Office (WFC Room 201D) with entry fee.

    E-Print Network [OSTI]

    Almor, Amit

    INTRAMURAL SPORTS TEAM REGISTRATION FORM To register your team, fill in the top portion of this form completely and bring it to the IM Office (WFC Room 201D) with entry fee. TEAM NAME:______________________________________________ NOTE: The University of South Carolina Intramural Sports Program reserves the right to change any team

  1. Use of Frequency Response Metrics to Assess the Planning and Operating Requirements for Reliable Integration of Variable Renewable Generation

    SciTech Connect (OSTI)

    Eto, Joseph H.; Undrill, John; Mackin, Peter; Daschmans, Ron; Williams, Ben; Haney, Brian; Hunt, Randall; Ellis, Jeff; Illian, Howard; Martinez, Carlos; O'Malley, Mark; Coughlin, Katie; LaCommare, Kristina Hamachi

    2010-12-20T23:59:59.000Z

    An interconnected electric power system is a complex system that must be operated within a safe frequency range in order to reliably maintain the instantaneous balance between generation and load. This is accomplished by ensuring that adequate resources are available to respond to expected and unexpected imbalances and restoring frequency to its scheduled value in order to ensure uninterrupted electric service to customers. Electrical systems must be flexible enough to reliably operate under a variety of"change" scenarios. System planners and operators must understand how other parts of the system change in response to the initial change, and need tools to manage such changes to ensure reliable operation within the scheduled frequency range. This report presents a systematic approach to identifying metrics that are useful for operating and planning a reliable system with increased amounts of variable renewable generation which builds on existing industry practices for frequency control after unexpected loss of a large amount of generation. The report introduces a set of metrics or tools for measuring the adequacy of frequency response within an interconnection. Based on the concept of the frequency nadir, these metrics take advantage of new information gathering and processing capabilities that system operators are developing for wide-area situational awareness. Primary frequency response is the leading metric that will be used by this report to assess the adequacy of primary frequency control reserves necessary to ensure reliable operation. It measures what is needed to arrest frequency decline (i.e., to establish frequency nadir) at a frequency higher than the highest set point for under-frequency load shedding within an interconnection. These metrics can be used to guide the reliable operation of an interconnection under changing circumstances.

  2. ANNUAL SUMMARY OF THE INTEGRATED DISPOSAL FACILITY PERFORMANCE ASSESSMENT FOR 2004

    SciTech Connect (OSTI)

    MANN, F M

    2005-02-09T23:59:59.000Z

    As required by the US. Department of Energy (DOE) order on radioactive waste management (DOE 1999a) and as implemented by the ''Maintenance Plan for the Hanford Immobilized Low-Activity Tank Waste Performance Assessment'' (Mann 2004), an annual summary of the adequacy of the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (ILAW PA) is necessary in each year in which a performance assessment is not issued. A draft version of the 2001 ILAW PA was sent to the DOE Headquarters (DOE/HQ) in April 2001 for review and approval. The DOE approved (DOE 2001) the draft version of the 2001 ILAW PA and issued a new version of the Hanford Site waste disposal authorization statement (DAS). Based on comments raised during the review, the draft version was revised and the 2001 ILAW PA was formally issued (Mann et al. 2001). The DOE (DOE 2003a) has reviewed the final 2001 ILAW PA and concluded that no changes to the DAS were necessary. Also as required by the DOE order, annual summaries have been generated and approved. The previous annual summary (Mann 2003b) noted the change of mission from ILAW disposal to the disposal of a range of solid waste types, including ILAW. DOE approved the annual summary (DOE 2003c), noting the expanded mission. Considering the results of data collection and analysis, the conclusions of the 2001 ILAW PA remain valid as they pertain to ILAW disposal. The new data also suggest that impacts from the disposal of the other solid waste will be lower than initially estimated in the ''Integrated Disposal Facility Risk Assessment'' (Mann 2003a). A performance assessment for the Integrated Disposal Facility (IDF) will be issued in the summer of 2005.

  3. 2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada; Review of the Performance Assessments and Composite Analyses

    SciTech Connect (OSTI)

    Shott, Gregory [NSTec] [NSTec

    2014-03-01T23:59:59.000Z

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 Evaluation of new or revised waste streams by special analysis Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.

  4. NRCS CSREES Watershed Assessments

    E-Print Network [OSTI]

    .E.A.P. Conservation Effects Assessment Project #12;Measuring the Environmental Benefits of Conservation;Conservation Effects Assessment Project Please turn off the ringers on your cell phones, pagers, blackberries The Conservation EffectsThe Conservation Effects Assessment ProjectAssessment Project (CEAP)(CEAP) #12;Scope

  5. ASSESSMENT FOR THE SOUTHWEST

    E-Print Network [OSTI]

    Wong, Pak Kin

    SERVICE CLIMATE CHANGE & CULTURAL RESOURCE PLANNING PROGRAM 17 EARTH SYSTEM MODELS 18 CLIMATE ASSESSMENTS

  6. UBC Social Ecological Economic Development Studies (SEEDS) Student Report CIRS Auditorium Ventilation System

    E-Print Network [OSTI]

    Ventilation System: Adequacy Assessment, Energy Consumption and Comfort of the Living Space Provided Prepared of a project/report". #12;CEEN 596 FINAL PROJECT REPORT CIRS Auditorium Ventilation System: Adequacy Assessment...........................................................................................13 a) The Ventilation System

  7. Water Pollution Fee (Michigan)

    Broader source: Energy.gov [DOE]

    The Groundwater Program regulates discharge to groundwater under Part 31, Water Resources Protection, of the Natural Resources and Environmental Protection Act, 1994 PA 451 and Part 22 Rules....

  8. Annual Emission Fees (Michigan)

    Broader source: Energy.gov [DOE]

    The Renewable Operating Permit (ROP) is required by Title V of the Clean Air Act Amendments of 1990. The ROP program clarifies the requirements that apply to a facility that emits air contaminants....

  9. NWP Fee Payments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated CodesTransparency VisitSilver Toyota PriusNSR KeyNUG NUCLEAR WORKFORCE

  10. Fees | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOEHazelPennsylvania:57427°, -89.4742177° ShowRural

  11. AWARD FEE PLAN TBD

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysisDarby/%2AO 474.2 Chg 1KANSAS CITY FIELD 10 6

  12. AWARD FEE PLAN TBD

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysisDarby/%2AO 474.2 Chg 1KANSAS CITY FIELD 10 6in

  13. Distributed road assessment system

    DOE Patents [OSTI]

    Beer, N. Reginald; Paglieroni, David W

    2014-03-25T23:59:59.000Z

    A system that detects damage on or below the surface of a paved structure or pavement is provided. A distributed road assessment system includes road assessment pods and a road assessment server. Each road assessment pod includes a ground-penetrating radar antenna array and a detection system that detects road damage from the return signals as the vehicle on which the pod is mounted travels down a road. Each road assessment pod transmits to the road assessment server occurrence information describing each occurrence of road damage that is newly detected on a current scan of a road. The road assessment server maintains a road damage database of occurrence information describing the previously detected occurrences of road damage. After the road assessment server receives occurrence information for newly detected occurrences of road damage for a portion of a road, the road assessment server determines which newly detected occurrences correspond to which previously detected occurrences of road damage.

  14. The role of Health Impact Assessment in the setting of air quality standards: An Australian perspective

    SciTech Connect (OSTI)

    Spickett, Jeffery, E-mail: J.Spickett@curtin.edu.au [WHO Collaborating Centre for Environmental Health Impact Assessment (Australia) [WHO Collaborating Centre for Environmental Health Impact Assessment (Australia); Faculty of Health Sciences, School of Public Health, Curtin University, Perth, Western Australia (Australia); Katscherian, Dianne [WHO Collaborating Centre for Environmental Health Impact Assessment (Australia) [WHO Collaborating Centre for Environmental Health Impact Assessment (Australia); Faculty of Health Sciences, School of Public Health, Curtin University, Perth, Western Australia (Australia); Harris, Patrick [CHETRE UNSW Research Centre for Primary Health Care and Equity, University of New South Wales (Australia)] [CHETRE UNSW Research Centre for Primary Health Care and Equity, University of New South Wales (Australia)

    2013-11-15T23:59:59.000Z

    The approaches used for setting or reviewing air quality standards vary from country to country. The purpose of this research was to consider the potential to improve decision-making through integration of HIA into the processes to review and set air quality standards used in Australia. To assess the value of HIA in this policy process, its strengths and weaknesses were evaluated aligned with review of international processes for setting air quality standards. Air quality standard setting programmes elsewhere have either used HIA or have amalgamated and incorporated factors normally found within HIA frameworks. They clearly demonstrate the value of a formalised HIA process for setting air quality standards in Australia. The following elements should be taken into consideration when using HIA in standard setting. (a) The adequacy of a mainly technical approach in current standard setting procedures to consider social determinants of health. (b) The importance of risk assessment criteria and information within the HIA process. The assessment of risk should consider equity, the distribution of variations in air quality in different locations and the potential impacts on health. (c) The uncertainties in extrapolating evidence from one population to another or to subpopulations, especially the more vulnerable, due to differing environmental factors and population variables. (d) The significance of communication with all potential stakeholders on issues associated with the management of air quality. In Australia there is also an opportunity for HIA to be used in conjunction with the NEPM to develop local air quality standard measures. The outcomes of this research indicated that the use of HIA for air quality standard setting at the national and local levels would prove advantageous. -- Highlights: Health Impact Assessment framework has been applied to a policy development process. HIA process was evaluated for application in air quality standard setting. Advantages of HIA in the air quality standard setting process are demonstrated.

  15. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161

    E-Print Network [OSTI]

    , Senior Systems Analyst SUBJECT: Council decision to release the 2017 Resource Adequacy Assessment The Council was briefed on the Resource Adequacy Forum's assessment of the power supply adequacy for 2017 supply in 2015 was on the cusp of becoming inadequate. Since that assessment, resource and load data have

  16. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161

    E-Print Network [OSTI]

    Power Systems Analyst SUBJECT: Council Decision to Release the 2019 Resource Adequacy Assessment for 2017. The current resource adequacy assessment shows a 6 percent LOLP for 2019. In 2021, after resources through 2024 to be about 1,800 megawatts. #12;Resource Adequacy Final Assessment for 2019 Council

  17. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161

    E-Print Network [OSTI]

    , Senior Systems Analyst SUBJECT: 2017 Resource Adequacy Assessment On October 26th , the Resource Adequacy Forum's steering committee will review the final resource adequacy assessment for 2017. Since that assessment, resource and load data have been updated. The most significant change has been

  18. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161

    E-Print Network [OSTI]

    Resource Analyst SUBJECT: Treatment of Non-hydro and IPP resources for the resource adequacy assessment for the assessment of resource adequacy. Staff will provide additional information regarding the treatment of these resources for the resource adequacy assessment at the July Power Committee meeting in Kalispell

  19. 851 S.W. Sixth Avenue, Suite 1100 Portland, Oregon 97204-1348

    E-Print Network [OSTI]

    for 2017 The region's most recent official resource 6th Northwest Power Plan in 2010. That assessment Adequacy for 2017 resource adequacy assessment was published in the Council's That assessment concluded Committee Members FROM: John Fazio, Senior Systems Analyst SUBJECT: Progress Report on Resource Adequacy

  20. Solar Resource Assessment

    SciTech Connect (OSTI)

    Renne, D.; George, R.; Wilcox, S.; Stoffel, T.; Myers, D.; Heimiller, D.

    2008-02-01T23:59:59.000Z

    This report covers the solar resource assessment aspects of the Renewable Systems Interconnection study. The status of solar resource assessment in the United States is described, and summaries of the availability of modeled data sets are provided.

  1. Edinburgh Motor Assessment (EMAS)

    E-Print Network [OSTI]

    Bak, Thomas

    2013-12-01T23:59:59.000Z

    Edinburgh Motor Assessment (EMAS) is a brief motor screening test, specifically designed for assessment of patients with dementia, aphasia and other cognitive disorders. It focuses, therefore, on those motor symptoms, ...

  2. Survey of Biomass Resource Assessments and Assessment Capabilities...

    Open Energy Info (EERE)

    Assessment Capabilities in APEC Economies Jump to: navigation, search Logo: Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Name Survey of...

  3. Writing Assessment: Additional Resources

    E-Print Network [OSTI]

    Schweik, Charles M.

    29 Appendix A Writing Assessment: Additional Resources #12;30 Where can I find out more into the assessment process. On-campus resources give you with a "real person" to contact should you have questions Resources for Higher Education Outcomes Assessment http://www2.acs.ncsu.edu/UPA/survey/resource.htm Ohio

  4. Management Assessment and Independent Assessment Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-05-31T23:59:59.000Z

    The revision to this Guide reflects current assessment practices, international standards, and changes in the Department of Energy expectations. Cancels DOE G 414.1-1. Canceled by DOE G 414.1-1B.

  5. Assessing the assessments: Pharmaceuticals in the environment

    SciTech Connect (OSTI)

    Enick, O.V. [Department of Biological Sciences, Simon Fraser University, Burnaby, BC, V5A 1S6 (Canada)], E-mail: oana.enick@gov.bc.ca; Moore, M.M. [Department of Biological Sciences, Simon Fraser University, Burnaby, BC, V5A 1S6 (Canada)], E-mail: mmoore@sfu.ca

    2007-11-15T23:59:59.000Z

    The relatively new issue of pharmaceutical contamination of the environment offers the opportunity to explore the application of values to the construction, communication and management of risk. The still-developing regulatory policies regarding environmental contamination with pharmaceuticals provide fertile ground for the introduction of values into the definition and management of risk. In this report, we summarize the current knowledge regarding pharmaceutical contamination of the environment and discuss specific attributes of pharmaceuticals that require special consideration. We then present an analysis showing that if values are incorporated into assessing, characterizing and managing risk, the results of risk assessments will more accurately reflect the needs of various stakeholders. Originating from an acknowledgement of the inherent uncertainty and value-laden nature of risk assessment, the precautionary principle (and later, the multi-criteria, integrated risk assessment), provides a direction for further research and policy development.

  6. Home Energy Assessments

    ScienceCinema (OSTI)

    Dispenza, Jason

    2013-05-29T23:59:59.000Z

    A home energy assessment, also known as a home energy audit, is the first step to assess how much energy your home consumes and to evaluate what measures you can take to make your home more energy efficient. An assessment will show you problems that may, when corrected, save you significant amounts of money over time. This video shows some of the ways that a contractor may test your home during an assessment, and helps you understand how an assessment can help you move toward energy savings. Find out more at: http://www.energysavers.gov/your_home/energy_audits/index.cfm/mytopic=11160

  7. Survey of Biomass Resource Assessments and Assessment Capabilities

    E-Print Network [OSTI]

    Survey of Biomass Resource Assessments and Assessment Capabilities in APEC Economies Energy ...................................................................................................................................4 Biomass Resource Assessment Products and Assessment Methodologies, Department of Industry, Tourism and Resources, Australia Ms. Siti Hafsah, Office of the Minister of Energy

  8. Pump Jet Mixing and Pipeline Transfer Assessment for High-Activity Radioactive Wastes in Hanford Tank 241-AZ-102

    SciTech Connect (OSTI)

    Y Onishi; KP Recknagle; BE Wells

    2000-08-09T23:59:59.000Z

    The authors evaluated how well two 300-hp mixer pumps would mix solid and liquid radioactive wastes stored in Hanford double-shell Tank 241-AZ-102 (AZ-102) and confirmed the adequacy of a three-inch (7.6-cm) pipeline system to transfer the resulting mixed waste slurry to the AP Tank Farm and a planned waste treatment (vitrification) plant on the Hanford Site. Tank AZ-102 contains 854,000 gallons (3,230 m{sup 3}) of supernatant liquid and 95,000 gallons (360 m{sup 3}) of sludge made up of aging waste (or neutralized current acid waste). The study comprises three assessments: waste chemistry, pump jet mixing, and pipeline transfer. The waste chemical modeling assessment indicates that the sludge, consisting of the solids and interstitial solution, and the supernatant liquid are basically in an equilibrium condition. Thus, pump jet mixing would not cause much solids precipitation and dissolution, only 1.5% or less of the total AZ-102 sludge. The pump jet mixing modeling indicates that two 300-hp mixer pumps would mobilize up to about 23 ft (7.0 m) of the sludge nearest the pump but would not erode the waste within seven inches (0.18 m) of the tank bottom. This results in about half of the sludge being uniformly mixed in the tank and the other half being unmixed (not eroded) at the tank bottom.

  9. Issues and Perspectives The Importance of Assessing Climate Change

    E-Print Network [OSTI]

    prioritizes attention on a small subset of ``special status'' species at high risk of extinction, but actions identification of species at risk of extinction. We compared climate change vulnerability and lists of special status species to examine the adequacy of current lists to represent species at risk of extinction

  10. ESCO PRELIMINARY ASSESSMENT TEMPLATE

    Broader source: Energy.gov [DOE]

    Document presents a template and example to help energy service companies (ESCOs) conduct preliminary assessments required for Federal energy savings performance contract (ESPC) projects.

  11. Hoisting & Rigging Assessment Form

    Broader source: Energy.gov [DOE]

    Assess the institutional and department/division hoisting and rigging (including forklift, overhead cranes small hoists, and mobile cranes) requirements, policies, procedures, and work practices...

  12. Sandia Energy - Assessment Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    petroleum storage and refineries; and transportation systems. Assessments were an early way to help clarify the systems as they existed in the field. This knowledge has...

  13. NATURAL GAS MARKET ASSESSMENT

    E-Print Network [OSTI]

    CALIFORNIA ENERGY COMMISSION NATURAL GAS MARKET ASSESSMENT PRELIMINARY RESULTS In Support.................................................................................... 6 Chapter 2: Natural Gas Demand.................................................................................................. 10 Chapter 3: Natural Gas Supply

  14. Assessments A Training Manual

    E-Print Network [OSTI]

    Modern Industrial Assessments A Training Manual Version 2.0 Sponsored by: Produced by: Dr. Michael. Modern Industrial Assessments: A Training Manual, grew from the desires of the United States Department conservation and waste minimization / pollution prevention training courses and information agencies sponsored

  15. Service Assessment HURRICANE FRAN

    E-Print Network [OSTI]

    Service Assessment HURRICANE FRAN August 28 - September 8, 1996 U.S.Department of Commerce National-12 Visible, 753 a.m. EDT, September4, 1996. #12;Service Assessment HURRICANE FRAN August 28 Bureau Hurricane Series ERRATA NOTICE One or more conditions of the original document may affect

  16. Final Draft ENVIRONMENTAL ASSESSMENT

    E-Print Network [OSTI]

    Waliser, Duane E.

    Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE OF THE CONSTELLATION PROGRAM, JOHN F. KENNEDY SPACE CENTER, FLORIDA Abstract This Environmental Assessment addresses AERONAUTICS AND SPACE ADMINISTRATION JOHN F. KENNEDY SPACE CENTER ENVIRONMENTAL PROGRAM OFFICE KENNEDY SPACE

  17. Assessment Statute Academic Policy

    E-Print Network [OSTI]

    Frean, Marcus

    ) and reliability (accurately representing the student's performance). #12;Assessment Statute Academic Policy to write clearly and accurately may be an important component of the assessment. 4.2 Passing a Course (a items. Lectures, tutorials, electronic and other distance- learning resources, practical and fieldwork

  18. INTERMOUNTAIN INDUSTRIAL ASSESSMENT CENTER

    SciTech Connect (OSTI)

    MELINDA KRAHENBUHL

    2010-05-28T23:59:59.000Z

    The U. S. Department of Energys Intermountain Industrial Assessment Center (IIAC) at the University of Utah has been providing eligible small- and medium-sized manufacturers with no-cost plant assessments since 2001, offering cost-effective recommendations for improvements in the areas of energy efficiency, pollution prevention, and productivity improvement.

  19. Environmental, Health and Safety Assessment: ATS 7H Program (Phase 3R) Test Activities at the GE Power Systems Gas Turbine Manufacturing Facility, Greenville, SC

    SciTech Connect (OSTI)

    None

    1998-11-17T23:59:59.000Z

    International Technology Corporation (IT) was contracted by General Electric Company (GE) to assist in the preparation of an Environmental, Health and Safety (HI&3) assessment of the implementation of Phase 3R of the Advanced Turbine System (ATS) 7H program at the GE Gas Turbines facility located in Greenville, South Carolina. The assessment was prepared in accordance with GE's contractual agreement with the U.S. Department of Energy (GE/DOE Cooperative Agreement DE-FC21-95MC3 1176) and supports compliance with the requirements of the National Environmental Policy Act of 1970. This report provides a summary of the EH&S review and includes the following: General description of current site operations and EH&S status, Description of proposed ATS 7H-related activities and discussion of the resulting environmental, health, safety and other impacts to the site and surrounding area. Listing of permits and/or licenses required to comply with federal, state and local regulations for proposed 7H-related activities. Assessment of adequacy of current and required permits, licenses, programs and/or plans.

  20. Environmental assessment of electricity scenarios with Life Cycle Assessment

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    been assessed with Life Cycle Assessment (LCA) studies [1], [2], [3] and [4]. However environmentalEnvironmental assessment of electricity scenarios with Life Cycle Assessment Touria Larbi1 impacts assessment of scenarios is very rarely evaluated through a life cycle perspective partly because

  1. Integrated assessment briefs

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    Integrated assessment can be used to evaluate and clarify resource management policy options and outcomes for decision makers. The defining characteristics of integrated assessment are (1) focus on providing information and analysis that can be understood and used by decision makers rather than for merely advancing understanding and (2) its multidisciplinary approach, using methods, styles of study, and considerations from a broader variety of technical areas than would typically characterize studies produced from a single disciplinary standpoint. Integrated assessment may combine scientific, social, economic, health, and environmental data and models. Integrated assessment requires bridging the gap between science and policy considerations. Because not everything can be valued using a single metric, such as a dollar value, the integrated assessment process also involves evaluating trade-offs among dissimilar attributes. Scientists at Oak Ridge National Laboratory (ORNL) recognized the importance and value of multidisciplinary approaches to solving environmental problems early on and have pioneered the development of tools and methods for integrated assessment over the past three decades. Major examples of ORNL`s experience in the development of its capabilities for integrated assessment are given.

  2. An Analysis of Two Industrial Assessment Center Extended Assessments

    E-Print Network [OSTI]

    Farouz, H. E.; Gafford, G. D.; Eggebrecht, J. A.; Heffington, W. M.

    The Industrial Assessment Center at Texas A&M University extended assessments by spending about two extra days at each of three manufacturing plants. The extended assessments are characterized by use of sophisticated electronic monitoring equipment...

  3. assessment ioa assessment: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Websites Summary: technology analysis Noon Lunch 1:15 California off-shore wind technology assessment 1:45 Technical assessmentRESEARCH RESULTS FORUM FOR RENEWABLE ENERGY...

  4. DOEEA-1203 Environmental Assessment

    Broader source: Energy.gov (indexed) [DOE]

    eve1 m i xed waste low-level waste National Environmental Policy Act o f 1969 performance assessment Resource Conservation and Recovery Act o f 1976 roentgen equi valent man...

  5. Assessing Renewable Energy Options

    Broader source: Energy.gov [DOE]

    Federal agencies should assess renewable energy options for each specific project when integrating renewable energy in new building construction or major renovations. This section covers the preliminary screening, screening, feasibility study, and sizing and designing systems phases.

  6. Literacy Assessment Using

    E-Print Network [OSTI]

    Qian, Ning

    Literacy Assessment Using Mobile Technology Sarah Muffly The Earth Institute and new mobile monitoring technologies. This could be carried out, it makes use of mobile technology to record and disseminate results

  7. Technology Readiness Assessment Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-15T23:59:59.000Z

    The Guide assists individuals and teams involved in conducting Technology Readiness Assessments (TRAs) and developing Technology Maturation Plans (TMPs) for the DOE capital asset projects subject to DOE O 413.3B. Cancels DOE G 413.3-4.

  8. RISK ASSESSMENT CLOUD COMPUTING

    E-Print Network [OSTI]

    Columbia University

    SECURITY RESEARCH PRIVACY RISK ASSESSMENT AMC DATA FISMA CLOUD COMPUTING MOBILE DEVICES OPERATIONS application hosted in the cloud Alaska DHHS fined $1.7M Portable device stolen from vehicle Mass Eye

  9. Colorado Statewide Forest Resource Assessment

    E-Print Network [OSTI]

    Colorado Statewide Forest Resource Assessment A Foundation for Strategic Discussion and Private Forestry Redesign Initiative 2 National Guidance for Statewide Forest Resource Assessments 4 The Colorado Statewide Resource Assessment and all appendices are available online on the Colorado State Forest

  10. Assessments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergyDepartmentWind Siting Articles about WindAssessments Assessments

  11. Sandia Energy - Security Risk Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Risk Assessment Home Climate & Earth Systems WaterEnergy Nexus Water Monitoring & Treatment Technology Security Risk Assessment Security Risk Assessmentcwdd2015-05-04T21:...

  12. Assessing the capabilities of patternshop measurement systems

    SciTech Connect (OSTI)

    Peters, F.E.; Voigt, R.C.

    1995-12-01T23:59:59.000Z

    Casting customers continue to demand tighter dimensional tolerances for casting features. The foundry then places demands on the patternshop to produce more accurate patterns. Control of all sources of dimensional variability, including measurement system variability in the foundry and patternshop, is important to insure casting accuracy. Sources of dimensional casting errors will be reviewed, focusing on the importance of accurate patterns. The foundry and patternshop together must work within the tolerance limits established by the customer. In light of contemporary pattern tolerances, the patternshop must review its current measurement methods. The measurement instrument must have sufficient resolution to detect part variability. In addition, the measurement equipment must be used consistently by all patternmakers to insure adequacy of the measurement system. Without these precautions, measurement error can significantly contribute to overall pattern variability. Simple robust methods to check the adequacy of pattern measurement systems are presented. These tests will determine the variability that is contributed by the measurement equipment and by the operators. Steps to control measurement variability once it has been identified are also provided. Measurement system errors for various types of measurement equipment are compared to the allowable pattern tolerances, that are established together by the foundry and patternshop.

  13. National Geothermal Resource Assessment and Classification |...

    Office of Environmental Management (EM)

    Resource Assessment and Classification National Geothermal Resource Assessment and Classification National Geothermal Resource Assessment and Classification presentation at the...

  14. DRAFT Fifteenmile Subbasin Assessment 3. Fifteenmile Subbasin Assessment

    E-Print Network [OSTI]

    DRAFT Fifteenmile Subbasin Assessment 3. Fifteenmile Subbasin Assessment DRAFT May 25 2004 Compiled. Fifteenmile Subbasin Assessment 1 Assessment Overview 1 3.1. Subbasin Overview 2 3.1.1. General Description 2.4. Limiting Environmental Factors and Populations of Aquatic Species 39 3.4.1. Winter Steelhead in Fifteenmile

  15. FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

    SciTech Connect (OSTI)

    Butcher, T.; Swingle, R.; Crapse, K.; Millings, M.; Sink, D.

    2011-01-01T23:59:59.000Z

    The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SA baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.

  16. Windows technology assessment

    SciTech Connect (OSTI)

    Baron, J.J.

    1995-10-01T23:59:59.000Z

    This assessment estimates that energy loss through windows is approximately 15 percent of all the energy used for space heating and cooling in residential and commercial buildings in New York State. The rule of thumb for the nation as a whole is about 25 percent. The difference may reflect a traditional assumption of single-pane windows while this assessment analyzed installed window types in the region. Based on the often-quoted assumption, in the United States some 3.5 quadrillion British thermal units (Btu) of primary energy, costing some $20 billion, is annually consumed as a result of energy lost through windows. According to this assessment, in New York State, the energy lost due to heat loss through windows is approximately 80 trillion Btu at an annual cost of approximately $1 billion.

  17. University Assessment Contacts Academic Units

    E-Print Network [OSTI]

    Escher, Christine

    .j.arp@oregonstate.edu 541-737-2331 Notes: Agricultural and Resource Economics Assessment Rep: Email: Phone: Penelope DiebelUniversity Assessment Contacts Academic Units COLLEGE OF AGRICULTURAL SCIENCES Assessment Rep.Capalbo@oregonstate.edu 541-737-5639 Notes: Agricultural Education and Agricultural Sciences Assessment Rep: Email: Phone

  18. Industrial Assessment Center

    SciTech Connect (OSTI)

    Dr. Diane Schaub

    2007-03-05T23:59:59.000Z

    Since its inception, the University of Florida Industrial Assessment Center has successfully completed close to 400 energy assessments of small to medium manufacturing facilities in Florida, southern Georgia and southern Alabama. Through these efforts, recommendations were made that would result in savings of about $5 million per year, with an implementation rate of 20-25%. Approximately 80 engineering students have worked for the UF-IAC, at least 10 of whom went on to work in energy related fields after graduation. Additionally, through the popular course in Industrial Energy Management, many students have graduated from the University of Florida with a strong understanding and support of energy conservation methods.

  19. Graduate Assessment Strategies 1. Sample assessment plans are online at http://inside.mines.edu/Assessment-Resources. The

    E-Print Network [OSTI]

    Graduate Assessment Strategies Resources: 1. Sample assessment plans are online at http://inside.mines.edu/Assessment-Resources. The graduate level assessment plans from OSU may be particularly helpful: http://oregonstate.edu/admin/aa/apaa/assessment/graduate-assessment/graduate- assessment-plans 2. A list of best practices is online at http://inside.mines.edu/UserFiles/File/Assessment

  20. Integrated assessment of a new Waste-to-Energy facility in Central Greece in the context of regional perspectives

    SciTech Connect (OSTI)

    Perkoulidis, G. [Laboratory of Heat Transfer and Environmental Engineering, Department of Mechanical Engineering, Aristotle University of Thessaloniki, Box 483, GR-54124 Thessaloniki (Greece); Papageorgiou, A., E-mail: giou6@yahoo.g [Laboratory of Heat Transfer and Environmental Engineering, Department of Mechanical Engineering, Aristotle University of Thessaloniki, Box 483, GR-54124 Thessaloniki (Greece); Karagiannidis, A. [Laboratory of Heat Transfer and Environmental Engineering, Department of Mechanical Engineering, Aristotle University of Thessaloniki, Box 483, GR-54124 Thessaloniki (Greece); Kalogirou, S. [Waste to Energy Research and Technology Council (Greece)

    2010-07-15T23:59:59.000Z

    The main aim of this study is the integrated assessment of a proposed Waste-to-Energy facility that could contribute in the Municipal Solid Waste Management system of the Region of Central Greece. In the context of this paper alternative transfer schemes for supplying the candidate facility were assessed considering local conditions and economical criteria. A mixed-integer linear programming model was applied for the determination of optimum locations of Transfer Stations for an efficient supplying chain between the waste producers and the Waste-to-Energy facility. Moreover different Regional Waste Management Scenarios were assessed against multiple criteria, via the Multi Criteria Decision Making method ELECTRE III. The chosen criteria were total cost, Biodegradable Municipal Waste diversion from landfill, energy recovery and Greenhouse Gas emissions and the analysis demonstrated that a Waste Management Scenario based on a Waste-to-Energy plant with an adjacent landfill for disposal of the residues would be the best performing option for the Region, depending however on the priorities of the decision makers. In addition the study demonstrated that efficient planning is necessary and the case of three sanitary landfills operating in parallel with the WtE plant in the study area should be avoided. Moreover alternative cases of energy recovery of the candidate Waste-to-Energy facility were evaluated against the requirements of the new European Commission Directive on waste in order for the facility to be recognized as recovery operation. The latter issue is of high significance and the decision makers in European Union countries should take it into account from now on, in order to plan and implement facilities that recover energy efficiently. Finally a sensitivity check was performed in order to evaluate the effects of increased recycling rate, on the calorific value of treated Municipal Solid Waste and the gate fee of the candidate plant and found that increased recycling efforts would not diminish the potential for incineration with energy recovery from waste and neither would have adverse impacts on the gate fee of the Waste-to-Energy plant. In general, the study highlighted the need for efficient planning in solid waste management, by taking into account multiple criteria and parameters and utilizing relevant tools and methodologies into this context.

  1. Geothermal industry assessment

    SciTech Connect (OSTI)

    Not Available

    1980-07-01T23:59:59.000Z

    An assessment of the geothermal industry is presented, focusing on industry structure, corporate activities and strategies, and detailed analysis of the technological, economic, financial, and institutional issues important to government policy formulation. The study is based principally on confidential interviews with executives of 75 companies active in the field. (MHR)

  2. Watershed Assessment Program Team

    E-Print Network [OSTI]

    ­ Proposal to model urban storm-water control practices · Teach advanced graduate course ­ BASINS and SWAT · Monitoring Activities · Modeling Activities · Remote Sensing / GIS · Sources of Funding · What do We Need · Much more monitoring being done by cities and local governments ­ Source water assessment work done

  3. ESPA Deltas: Assessing Health,

    E-Print Network [OSTI]

    Sbester, Andrs

    weather events and sea-level rise, coupled with population growth and urbanisation. The Project The ESPAEcosystems Livelihood Services Poverty Community ESPA Deltas: Assessing Health, Livelihoods www.espadeltas.net@EspaDeltas Who are the poor? Who are the key stakeholders and what are their roles

  4. Development of transient initiating event frequencies for use in probabilistic risk assessments

    SciTech Connect (OSTI)

    Mackowiak, D.P.; Gentillon, C.D.; Smith, K.L.

    1985-05-01T23:59:59.000Z

    Transient initiating event frequencies are an essential input to the analysis process of a nuclear power plant probabilistic risk assessment. These frequencies describe events causing or requiring scrams. This report documents an effort to validate and update from other sources a computer-based data file developed by the Electric Power Research Institute (EPRI) describing such events at 52 United States commercial nuclear power plants. Operating information from the United States Nuclear Regulatory Commission on 24 additional plants from their date of commercial operation has been combined with the EPRI data, and the entire data base has been updated to add 1980 through 1983 events for all 76 plants. The validity of the EPRI data and data analysis methodology and the adequacy of the EPRI transient categories are examined. New transient initiating event frequencies are derived from the expanded data base using the EPRI transient categories and data display methods. Upper bounds for these frequencies are also provided. Additional analyses explore changes in the dominant transients, changes in transient outage times and their impact on plant operation, and the effects of power level and scheduled scrams on transient event frequencies. A more rigorous data analysis methodology is developed to encourage further refinement of the transient initiating event frequencies derived herein. Updating the transient event data base resulted in approx.2400 events being added to EPRI's approx.3000-event data file. The resulting frequency estimates were in most cases lower than those reported by EPRI, but no significant order-of-magnitude changes were noted. The average number of transients per year for the combined data base is 8.5 for pressurized water reactors and 7.4 for boiling water reactors.

  5. Functional Area Assessments Project Charter Workstream Name Functional Area Assessments

    E-Print Network [OSTI]

    Sheridan, Jennifer

    with Huron on detailed project plan. Subject Experts Subject Expert Role Functional leadership Administrative1 of 2 Functional Area Assessments Project Charter Workstream Name Functional Area Assessments - Internal Budgeting - Human Resources These diagnostics will be performed using interviews, surveys, data

  6. Integrated models of capital adequacy Why banks are undercapitalised

    E-Print Network [OSTI]

    McNeil, Alexander J.

    criticism. We propose that the current methodological void at the heart of Basel II, Pillar 2 is filled applied to the design of financial regulation...the crisis which began in the US sub-prime mortgage market in early 2007 and then spread broadly and deeply was not the first banking crisis. It was closer to the 100

  7. Legal Adequacy of Environmental Discussions in Environmental Impact Reports

    E-Print Network [OSTI]

    Goldman, Eric

    1982-01-01T23:59:59.000Z

    potentially adverse environmental impacts and the manner inmust compare environmental impacts of proposed amendments tonote 10, 15126(c). ENVIRONMENTAL IMPACT REPORTS in an area

  8. R AdResource Adequacy Advisory CommitteeAdvisory Committee

    E-Print Network [OSTI]

    and licensed Wind Sited and licensed RPS or Sited and licensed? Solar Not modeled Unknown Demand response) maintenance All of May and June Part of May and June Coal maintenance Reduce cap based on aggregate Reduce cap based on aggregate G i t R d b d t R d b d tGas maintenance Reduce cap based on aggregate Reduce cap

  9. R AdResource Adequacy Advisory CommitteeAdvisory Committee

    E-Print Network [OSTI]

    . Non-NW wind in the NW 10. Generating resourcesg 11. SW market availability 12. Demand response updates Need potential markets for Idaho 13 #12;Demand Response and Distributed Generation: In progress Need aggregate SW market on and off peak for winter and summer Need within region market

  10. The Adequacy of DOE Natural Phenomena Hazards Performance Goals...

    Office of Environmental Management (EM)

    from an Accident Analysis Perspective More Documents & Publications November 2012 Seismic Lessons-Learned panel Meeting Assigning Seismic Design Category to Large Reactors: A...

  11. Market Design for Generation Adequacy: Healing Causes rather than Symptoms

    E-Print Network [OSTI]

    Roques, Fabien A

    for charging offpeak consumers with capacity costs by relating it to the reliability design criterion employed in planning for the capacity expansion of the power system, e.g. the loss of load probability (LOLP). Under optimal capacity planning the marginal... of the generating units, which represents a measure of the contribution of each generating unit to the reliability of the power system (Batlle et al., 2007). Frequent conflicts have arisen because of the rules of definition of firm capacity of hydro plants...

  12. The Adequacy of DOE Natural Phenomena Hazards Performance Goals...

    Broader source: Energy.gov (indexed) [DOE]

    or needs additional guidance Background * ANS Standard 2.26 and the concept of Seismic Design Categories (SDC) and Limit States (LS) * ASCE Standard 43-05 and the concept...

  13. DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT-

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: Theof"Wave theJulyD&D Project| Department ofE-Government Act Report

  14. Draft Chapter 4: Transmission Adequacy | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonnaDraft3: Demand-Side

  15. esource Adequacy Implications of Forthcoming EPA Air Quality Regulation

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2, 2015Visiting Strong,Women @JoinEnergyappearancecrd title6eCPIC Table

  16. Assessment of the facilities on Jackass Flats and other Nevada Test Site facilities for the new nuclear rocket program

    SciTech Connect (OSTI)

    Chandler, G.; Collins, D.; Dye, K.; Eberhart, C.; Hynes, M.; Kovach, R.; Ortiz, R.; Perea, J.; Sherman, D.

    1992-12-01T23:59:59.000Z

    Recent NASA/DOE studies for the Space Exploration Initiative have demonstrated a critical need for the ground-based testing of nuclear rocket engines. Experience in the ROVER/NERVA Program, experience in the Nuclear Weapons Testing Program, and involvement in the new nuclear rocket program has motivated our detailed assessment of the facilities used for the ROVER/NERVA Program and other facilities located at the Nevada Test Site (NTS). The ROVER/NERVA facilities are located in the Nevada Research L, Development Area (NRDA) on Jackass Flats at NTS, approximately 85 miles northwest of Las Vegas. To guide our assessment of facilities for an engine testing program we have defined a program goal, scope, and process. To execute this program scope and process will require ten facilities. We considered the use of all relevant facilities at NTS including existing and new tunnels as well as the facilities at NRDA. Aside from the facilities located at remote sites and the inter-site transportation system, all of the required facilities are available at NRDA. In particular we have studied the refurbishment of E-MAD, ETS-1, R-MAD, and the interconnecting railroad. The total cost for such a refurbishment we estimate to be about $253M which includes additional contractor fees related to indirect, construction management, profit, contingency, and management reserves. This figure also includes the cost of the required NEPA, safety, and security documentation.

  17. Composite heat damage assessment

    SciTech Connect (OSTI)

    Janke, C.J.; Wachter, E.A. [Oak Ridge National Lab., TN (United States); Philpot, H.E. [Oak Ridge K-25 Site, TN (United States); Powell, G.L. [Oak Ridge Y-12 Plant, TN (United States)

    1993-12-31T23:59:59.000Z

    The effects of heat damage were determined on the residual mechanical, physical, and chemical properties of IM6/3501-6 laminates, and potential nondestructive techniques to detect and assess material heat damage were evaluated. About one thousand preconditioned specimens were exposed to elevated temperatures, then cooled to room temperature and tested in compression, flexure, interlaminar shear, shore-D hardness, weight loss, and change in thickness. Specimens experienced significant and irreversible reduction in their residual properties when exposed to temperatures exceeding the material upper service temperature of this material (350{degrees}F). The Diffuse Reflectance Infrared Fourier Transform and Laser-Pumped Fluorescence techniques were found to be capable of rapid, in-service, nondestructive detection and quantitation of heat damage in IM6/3501- 6. These techniques also have the potential applicability to detect and assess heat damage effects in other polymer matrix composites.

  18. Assessment summary, Jan. 2004

    E-Print Network [OSTI]

    Education Provision of a suite of short (1-2 day), industry-focused courses Delivered in Cambridge UK by MIT and CU faculty Premium priced - 500-600 per delegate day Targeted at the technology/business interface Heavy upfront investment in development... , Collins) KE Practices Decide on model contract notion (w/Aldridge) Decide/commission performer on univ-industry best practice study Assessment: January 2003 EHGI meeting: Edinburgh*, Strathclyde*, Sheffield*, CU, Lancaster, Durham, Loughborough, MIT...

  19. Environmental epidemiology: risk assessment

    SciTech Connect (OSTI)

    Prentice, R.L.; Whittemore, A.S. (eds.)

    1982-01-01T23:59:59.000Z

    Papers presented at the symposium are in the disciplines of biometry, environmental medicine, epidemiology, mathematics, and statistics. Attention is given to assessing risk due to environmental agents, particularly those known to be carcinogenic; both the complex medical issues involved and the mathematical and statistical methodologies used in analysis are presented. Separate abstracts have been prepared for 15 papers for inclusion in the Energy Data Base. (RJC)

  20. PUREX facility hazards assessment

    SciTech Connect (OSTI)

    Sutton, L.N.

    1994-09-23T23:59:59.000Z

    This report documents the hazards assessment for the Plutonium Uranium Extraction Plant (PUREX) located on the US Department of Energy (DOE) Hanford Site. Operation of PUREX is the responsibility of Westinghouse Hanford Company (WHC). This hazards assessment was conducted to provide the emergency planning technical basis for PUREX. DOE Order 5500.3A requires an emergency planning hazards assessment for each facility that has the potential to reach or exceed the lowest level emergency classification. In October of 1990, WHC was directed to place PUREX in standby. In December of 1992 the DOE Assistant Secretary for Environmental Restoration and Waste Management authorized the termination of PUREX and directed DOE-RL to proceed with shutdown planning and terminal clean out activities. Prior to this action, its mission was to reprocess irradiated fuels for the recovery of uranium and plutonium. The present mission is to establish a passively safe and environmentally secure configuration at the PUREX facility and to preserve that condition for 10 years. The ten year time frame represents the typical duration expended to define, authorize and initiate follow-on decommissioning and decontamination activities.

  1. MELCOR assessment at SNL

    SciTech Connect (OSTI)

    Kmetyk, L. N.

    1992-01-01T23:59:59.000Z

    MELCOR is a fully integrated, engineering-level computer code that models the progression of severe accidents in light water reactor (LWR) nuclear power plants, being developed at Sandia National Laboratories for the US Nuclear Regulatory Commission (USNRC). The entire spectrum of severe accident phenomena, including reactor coolant system and containment thermal/hydraulic response, core heatup, degradation and relocation, and fission product release and transport, is treated in MELCOR in a unified framework for both boiling water reactors (BWRS) and pressurized water reactors (PWRs). The MELCOR computer code has been developed to the point that it is now being successfully applied in severe accident analyses, particularly in probabilistic risk assessment (PRA) studies. MELCOR was the first of the severe accident analysis codes to undergo a formal peer review process. One of the major conclusions of the recent MELCOR Peer Review was the need for a more comprehensive and more systematic program of MELCOR assessment. A systematic program of code assessment provides a number of benefits, including: 1. guidance to the code developers in identification of areas where code improvements are needed (such as coding implementation errors in models, inappropriate or deficient models, missing models, excessive numerical sensitivities), 2. documented evidence to external observers, users, reviewers and project management that the code is modelling required phenomena correctly, and 3. increased general public acceptance that the code adequately treats issues related to public safety concerns.

  2. Life cycle assessment

    SciTech Connect (OSTI)

    Curran, M.A. [Environmental Protection Agency, Cincinnati, OH (United States)

    1994-12-31T23:59:59.000Z

    Life-Cycle Assessment (LCA) is a technical, data-based and holistic approach to define and subsequently reduce the environmental burdens associated with a product, process, or activity by identifying and quantifying energy and material usage and waste discharges, assessing the impact of those wastes on the environment, and evaluating and implementing opportunities to effect environmental improvements. The assessment includes the entire life-cycle of the product, process or activity encompassing extraction and processing of raw materials, manufacturing, transportation and distribution, use/reuse, recycling and final disposal. LCA is a useful tool for evaluating the environmental consequences of a product, process, or activity, however, current applications of LCA have not been performed in consistent or easily understood ways. This inconsistency has caused increased criticism of LCA. The EPA recognized the need to develop an LCA framework which could be used to provide consistent use across the board. Also, additional research is needed to enhance the understanding about the steps in the performance of an LCA and its appropriate usage. This paper will present the research activities of the EPA leading toward the development of an acceptable method for conducting LCA`s. This research has resulted in the development of two guidance manuals. The first manual is intended to be a practical guide to conducting and interpreting the life-cycle inventory. A nine-step approach to performing a comprehensive inventory is presented along with the general issues to be addressed. The second manual addresses life-cycle design.

  3. ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/

    E-Print Network [OSTI]

    ENVIRONMENTAL ASSESSMENT/ REGULATORY IMPACT REVIEW/ FINAL REGULATORY FLEXIBILITY ANALYSIS Area and Regulatory Amendments for Bering Sea Habitat Conservation May 2008 Lead Agency: National Juneau, AK 99802 (907) 586-7228 Abstract: This Environmental Assessment/Regulatory Impact Review

  4. Uncertainties in energy technology assessments

    E-Print Network [OSTI]

    Coate, David

    1980-01-01T23:59:59.000Z

    In order to make important contributions, energy technology assessments must be large, interdisciplinary projects, generally becoming very time consuming and expensive. This small project does not involve a large assessment, ...

  5. Dual Rater Competency Assessment FAQ

    Broader source: Energy.gov [DOE]

    The purpose of the dual rater competency assessment is to provide a clearer picture of the individuals developmental needs by combining self-assessment and supervisory input. Together, these two...

  6. Sandia Energy - SCADA Vulnerability Assessments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SCADA Vulnerability Assessments Home Stationary Power Safety, Security & Resilience of Energy Infrastructure Grid Modernization Cyber Security for Electric Infrastructure National...

  7. ORISE: Radiological program assessment services

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental monitoring programs Operational environments Decontamination and decommissioning projects Compliance assessments Radiological release programs ORISE is actively...

  8. DOE limited standard: Operations assessments

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    Purpose of this standard is to provide DOE Field Element assessors with a guide for conducting operations assessments, and provide DOE Field Element managers with the criteria of the EM Operations Assessment Program. Sections 6.1 to 6.21 provide examples of how to assess specific areas; the general techniques of operations assessments (Section 5) may be applied to other areas of health and safety (e.g. fire protection, criticality safety, quality assurance, occupational safety, etc.).

  9. Assessor Training NVLAP Assessment Forms

    E-Print Network [OSTI]

    NVLAP Assessor Training NVLAP Assessment Forms #12;Assessor Training 2009: NVLAP Assessment Forms 2 Summary Test Method Review Summary ProgramSpecific Checklists Examples #12;Assessor Training 2009: NVLAP are completed Assessor Names, Dates, Lab Code #12;Assessor Training 2009: NVLAP Assessment Forms 4 NIST

  10. Assessment of Demand Response Resource

    E-Print Network [OSTI]

    Assessment of Demand Response Resource Potentials for PGE and Pacific Power Prepared for: Portland January 15, 2004 K:\\Projects\\2003-53 (PGE,PC) Assess Demand Response\\Report\\Revised Report_011504.doc #12;#12;quantec Assessment of Demand Response Resource Potentials for I-1 PGE and Pacific Power I. Introduction

  11. "" EPAT# Risk Assessments Environmental Impact

    E-Print Network [OSTI]

    "" EPAT# Risk Assessments Appendixes Environmental Impact Statement NESHAPS for Radionuclides for Hazardous Air Pollutants Risk Assessments Environmental Impact Statement for NESHAPS Radionuclides VOLUME 2 for Hazardous Air Pollutants EPA 520.1'1.-89-006,-2 Risk Assessments Environmental Impact Statement for NESHAPS

  12. NARSTO OZONE ASSESSMENT EXECUTIVE SUMMARY

    E-Print Network [OSTI]

    vi NARSTO OZONE ASSESSMENT EXECUTIVE SUMMARY Prepared as a NARSTO initiative, this tropospheric O3 in the accompanying Textbox, the NARSTO Ozone Assessment contains two product components. The first of these is a set aspects of tropospheric ozone pollution. The second component, the NARSTO Ozone Assessment Document

  13. A framework for combining social impact assessment and risk assessment

    SciTech Connect (OSTI)

    Mahmoudi, Hossein, E-mail: mahmoudi@uni-hohenheim.de [Department of Social Sciences in Agriculture, University of Hohenheim (Germany) [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Environmental Sciences Research Institute, Shahid Beheshti University, G.C. (Iran, Islamic Republic of); Renn, Ortwin [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany)] [Department of Technology and Environmental Sociology (and DIALOGIK), University of Stuttgart (Germany); Vanclay, Frank [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands)] [Department of Cultural Geography, Faculty of Spatial Sciences, University of Groningen, Groningen (Netherlands); Hoffmann, Volker [Department of Social Sciences in Agriculture, University of Hohenheim (Germany)] [Department of Social Sciences in Agriculture, University of Hohenheim (Germany); Karami, Ezatollah [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)] [College of Agriculture, Shiraz University, Shiraz (Iran, Islamic Republic of)

    2013-11-15T23:59:59.000Z

    An increasing focus on integrative approaches is one of the current trends in impact assessment. There is potential to combine impact assessment with various other forms of assessment, such as risk assessment, to make impact assessment and the management of social risks more effective. We identify the common features of social impact assessment (SIA) and social risk assessment (SRA), and discuss the merits of a combined approach. A hybrid model combining SIA and SRA to form a new approach called, risk and social impact assessment (RSIA) is introduced. RSIA expands the capacity of SIA to evaluate and manage the social impacts of risky projects such as nuclear energy as well as natural hazards and disasters such as droughts and floods. We outline the three stages of RSIA, namely: impact identification, impact assessment, and impact management. -- Highlights: A hybrid model to combine SIA and SRA namely RSIA is proposed. RSIA can provide the proper mechanism to assess social impacts of natural hazards. RSIA can play the role of ex-post as well as ex-ante assessment. For some complicated and sensitive cases like nuclear energy, conducting a RSIA is necessary.

  14. Utility of Social Modeling for Proliferation Assessment - Preliminary Assessment

    SciTech Connect (OSTI)

    Coles, Garill A.; Gastelum, Zoe N.; Brothers, Alan J.; Thompson, Sandra E.

    2009-06-01T23:59:59.000Z

    This Preliminary Assessment draft report will present the results of a literature search and preliminary assessment of the body of research, analysis methods, models and data deemed to be relevant to the Utility of Social Modeling for Proliferation Assessment research. This report will provide: 1) a description of the problem space and the kinds of information pertinent to the problem space, 2) a discussion of key relevant or representative literature, 3) a discussion of models and modeling approaches judged to be potentially useful to the research, and 4) the next steps of this research that will be pursued based on this preliminary assessment. This draft report represents a technical deliverable for the NA-22 Simulations, Algorithms, and Modeling (SAM) program. Specifically this draft report is the Task 1 deliverable for project PL09-UtilSocial-PD06, Utility of Social Modeling for Proliferation Assessment. This project investigates non-traditional use of social and cultural information to improve nuclear proliferation assessment, including nonproliferation assessment, proliferation resistance assessments, safeguards assessments and other related studies. These assessments often use and create technical information about the States posture towards proliferation, the vulnerability of a nuclear energy system to an undesired event, and the effectiveness of safeguards. This project will find and fuse social and technical information by explicitly considering the role of cultural, social and behavioral factors relevant to proliferation. The aim of this research is to describe and demonstrate if and how social science modeling has utility in proliferation assessment.

  15. Integrated Assessment Modeling

    SciTech Connect (OSTI)

    Edmonds, James A.; Calvin, Katherine V.; Clarke, Leon E.; Janetos, Anthony C.; Kim, Son H.; Wise, Marshall A.; McJeon, Haewon C.

    2012-10-31T23:59:59.000Z

    This paper discusses the role of Integrated Assessment models (IAMs) in climate change research. IAMs are an interdisciplinary research platform, which constitutes a consistent scientific framework in which the large-scale interactions between human and natural Earth systems can be examined. In so doing, IAMs provide insights that would otherwise be unavailable from traditional single-discipline research. By providing a broader view of the issue, IAMs constitute an important tool for decision support. IAMs are also a home of human Earth system research and provide natural Earth system scientists information about the nature of human intervention in global biogeophysical and geochemical processes.

  16. Sandia Energy - Assessment Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Scienceand Requirements RecentlyElectronicResourcesjobsJulyCatalystsMolten-SaltAssessment Program

  17. Assessing Pathways in Aruba

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube platform is alwaysISOSource Heat 1PowerofSystems |As Electric2: Assessing

  18. Wind Resource Assessment in Europe Using Emergy

    E-Print Network [OSTI]

    Paudel, Subodh; Santarelli, Massimo; Martin, Viktoria; Lacarriere, Bruno; Le Corre, Olivier

    2014-01-01T23:59:59.000Z

    energy in Vietnam: Resource assessment, development statusWind Resource Assessment in Europe Using Emergy Subodhspeed). Keywords: Wind resource assessment; Emergy Analysis;

  19. Sandia Energy - Risk and Safety Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk and Safety Assessment Home Stationary Power Nuclear Fuel Cycle Nuclear Energy Safety Technologies Risk and Safety Assessment Risk and Safety AssessmentTara...

  20. Perceptual quality assessment for compressed video

    E-Print Network [OSTI]

    Yang, Kai-Chieh

    2007-01-01T23:59:59.000Z

    Overview of Video Quality Assessment . . . . . . . . . . . .2.3.1 Subjective Video Quality Assessment . . . . . . . .2.3.2 Objective Video Quality Assessment . . . . . . . . .

  1. Program Plan for Revision of the Z-Area Saltstone Disposal Facility Performance Assessment

    SciTech Connect (OSTI)

    Cook, James R.

    2005-12-07T23:59:59.000Z

    Savannah River National Laboratory (SRNL) and the Saltstone Project, are embarking on the next revision to the Saltstone Disposal Facility (SDF) performance assessment (PA). This program plan has been prepared to outline the general approach, scope, schedule and resources for the PA revision. The plan briefly describes the task elements of the PA process. It discusses critical PA considerations in the development of conceptual models and interpretation of results. Applicable quality assurance (QA) requirements are identified and the methods for implementing QA for both software and documentation are described. The plan identifies project resources supporting the core team and providing project oversight. Program issues and risks are identified as well as mitigation of those risks. Finally, a preliminary program schedule has been developed and key deliverables identified. A number of significant changes have been implemented since the last PA revision resulting in a new design for future SDF disposal units. This revision will encompass the existing and planned disposal units, PA critical radionuclides and exposure pathways important to SDF performance. An integrated analysis of the overall facility layout, including all disposal units, will be performed to assess the impact of plume overlap on PA results. Finally, a rigorous treatment of uncertainty will be undertaken using probabilistic simulations. This analysis will be reviewed and approved by DOE-SR, DOE-HQ and potentially the Nuclear Regulatory Commission (NRC). This revision will be completed and ready for the start of the DOE review at the end of December 2006. This work supports a Saltstone Vault 2 fee-bearing milestone. This milestone includes completion of the Vault 2 module of the PA revision by the end of FY06.

  2. 2012 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    SciTech Connect (OSTI)

    Shott, G. [National Security Technologies, LLC

    2013-03-18T23:59:59.000Z

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: ? Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA ? Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012 ? Evaluation of new or revised waste streams by special analysis ? Development of version 4.114 of the Area 5 RWMS GoldSim PA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term R&D efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.

  3. Air Pollution Control Fees (Ohio)

    Broader source: Energy.gov [DOE]

    Facilities with a potential to emit any one regulated air pollutant of a quantity greater than or equal to 100 tons per year, or any one hazardous air pollutant (HAP) greater than or equal to 10...

  4. SCHEDULE OF FEES Wet Milling

    E-Print Network [OSTI]

    Illinois at Urbana-Champaign, University of

    of Agricultural and Biological Engineering Agricultural Engineering Sciences Bldg. 1304 West Pennsylvania Avenue and other factors. Tests follow strict standard operating procedures and follow methods similar to Good Laboratory Practices (GLP). Studies using fully documented GLP methods or large studies can be conducted

  5. TRANSPORTATION SERVICES VEHICLE RENTAL FEES

    E-Print Network [OSTI]

    ) $120.00 PARTS + 10% BRAKE SHOE REPLACEMENT (REAR) $180.00 PARTS + 10% ENGINE FLUSH $60.00 OIL CHANGE $60.00 QM HEAVY EQUIPMENT & OTHERS QM VEHICLES $250.00 SAFETY CHECK $20.00 TIRE SERVICE HEAVY EQUIPMENT TIRE SERVICE FLAT REPAIR $30.00 TIRE SERVICE REPLACEMENT

  6. QER- Comment of Christopher Fee

    Broader source: Energy.gov [DOE]

    Until you stop subsidizing and worshipping at the altar of Big Energy, all this "We the people" crapola is just that. We no longer have. Democracy, Mr. Reed, because our government is owned by heartless men with big pockets. Sent from my iPhone. La dee freakin' da.

  7. REVIEWING PERFORMANCE ASSESSMENTS SUPPORTING

    E-Print Network [OSTI]

    Robert J. Lewis

    2010-01-01T23:59:59.000Z

    Purpose: To summarize current NRC policy and guidance, which should assist in making informed decisions regarding land disposal of unique low-level radioactive waste streams, including disposal of significant quantities of depleted uranium until a new regulation is implemented. Background: In September 2009, NRC staff conducted two public workshops soliciting early public input on major issues associated with a potential rulemaking for land disposal of unique waste streams including, but not limited to, significant quantities of depleted uranium. During these workshops, a number of stakeholders expressed interest or concern with the review of performance assessments supporting land disposal of unique waste streams prior to completion of the rulemaking process. Discussion: The enclosure contains a summary of existing guidance for reviewing performance assessments with a focus on issues associated with the safe disposal of unique waste streams. NRC staff is providing this guidance to the Agreement States for their information, and for distribution to their licensees, as appropriate. If you have any questions regarding this correspondence, please contact me at 301-415-3340 or the individuals named below.

  8. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161

    E-Print Network [OSTI]

    , senior system analyst SUBJECT: Resource Adequacy Assessment for 2011 and 2013 Summary: The Northwest-2) ra assessment cm.doc #12;Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Power is unlikely to face a blackout over the next five years, according to the latest assessment from the Council

  9. NATURAL RESOURCES ASSESSMENT

    SciTech Connect (OSTI)

    D.F. Fenster

    2000-12-11T23:59:59.000Z

    The purpose of this report is to summarize the scientific work that was performed to evaluate and assess the occurrence and economic potential of natural resources within the geologic setting of the Yucca Mountain area. The extent of the regional areas of investigation for each commodity differs and those areas are described in more detail in the major subsections of this report. Natural resource assessments have focused on an area defined as the ''conceptual controlled area'' because of the requirements contained in the U.S. Nuclear Regulatory Commission Regulation, 10 CFR Part 60, to define long-term boundaries for potential radionuclide releases. New requirements (proposed 10 CFR Part 63 [Dyer 1999]) have obviated the need for defining such an area. However, for the purposes of this report, the area being discussed, in most cases, is the previously defined ''conceptual controlled area'', now renamed the ''natural resources site study area'' for this report (shown on Figure 1). Resource potential can be difficult to assess because it is dependent upon many factors, including economics (demand, supply, cost), the potential discovery of new uses for resources, or the potential discovery of synthetics to replace natural resource use. The evaluations summarized are based on present-day use and economic potential of the resources. The objective of this report is to summarize the existing reports and information for the Yucca Mountain area on: (1) Metallic mineral and mined energy resources (such as gold, silver, etc., including uranium); (2) Industrial rocks and minerals (such as sand, gravel, building stone, etc.); (3) Hydrocarbons (including oil, natural gas, tar sands, oil shales, and coal); and (4) Geothermal resources. Groundwater is present at the Yucca Mountain site at depths ranging from 500 to 750 m (about 1,600 to 2,500 ft) below the ground surface. Groundwater resources are not discussed in this report, but are planned to be included in the hydrology section of future revisions of the ''Yucca Mountain Site Description'' (CRWMS M&O 2000c).

  10. Airborne Particulate Threat Assessment

    SciTech Connect (OSTI)

    Patrick Treado; Oksana Klueva; Jeffrey Beckstead

    2008-12-31T23:59:59.000Z

    Aerosol threat detection requires the ability to discern between threat agents and ambient background particulate matter (PM) encountered in the environment. To date, Raman imaging technology has been demonstrated as an effective strategy for the assessment of threat agents in the presence of specific, complex backgrounds. Expanding our understanding of the composition of ambient particulate matter background will improve the overall performance of Raman Chemical Imaging (RCI) detection strategies for the autonomous detection of airborne chemical and biological hazards. Improving RCI detection performance is strategic due to its potential to become a widely exploited detection approach by several U.S. government agencies. To improve the understanding of the ambient PM background with subsequent improvement in Raman threat detection capability, ChemImage undertook the Airborne Particulate Threat Assessment (APTA) Project in 2005-2008 through a collaborative effort with the National Energy Technology Laboratory (NETL), under cooperative agreement number DE-FC26-05NT42594. During Phase 1 of the program, a novel PM classification based on molecular composition was developed based on a comprehensive review of the scientific literature. In addition, testing protocols were developed for ambient PM characterization. A signature database was developed based on a variety of microanalytical techniques, including scanning electron microscopy, FT-IR microspectroscopy, optical microscopy, fluorescence and Raman chemical imaging techniques. An automated particle integrated collector and detector (APICD) prototype was developed for automated collection, deposition and detection of biothreat agents in background PM. During Phase 2 of the program, ChemImage continued to refine the understanding of ambient background composition. Additionally, ChemImage enhanced the APICD to provide improved autonomy, sensitivity and specificity. Deliverables included a Final Report detailing our findings and APICD Gen II subsystems for automated collection, deposition and detection of ambient particulate matter. Key findings from the APTA Program include: Ambient biological PM taxonomy; Demonstration of key subsystems needed for autonomous bioaerosol detection; System design; Efficient electrostatic collection; Automated bioagent recognition; Raman analysis performance validating Td<9 sec; Efficient collection surface regeneration; and Development of a quantitative bioaerosol defection model. The objective of the APTA program was to advance the state of our knowledge of ambient background PM composition. Operation of an automated aerosol detection system was enhanced by a more accurate assessment of background variability, especially for sensitive and specific sensing strategies like Raman detection that are background-limited in performance. Based on this improved knowledge of background, the overall threat detection performance of Raman sensors was improved.

  11. assessment risk assessment: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Procedure 447 A 576-YEAR WEBER RIVER STREAMFLOW RECONSTRUCTION FROM TREE RINGS FOR WATER RESOURCE RISK ASSESSMENT IN THE WASATCH FRONT, UTAH1 Environmental Sciences and Ecology...

  12. assessment performance assessment: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    set of 24 solid metals ... Csonka, Gabor I. 17 A consistent multi-user framework for assessing system performance CERN Preprints Summary: Agreeing suitability for purpose and...

  13. Natural Gas Resources of the Greater Green River and Wind River Basins of Wyoming (Assessing the Technology Needs of Sub-economic Resources, Phase I: Greater Green River and Wind river Basins, Fall 2002)

    SciTech Connect (OSTI)

    Boswell, Ray; Douds, Ashley; Pratt, Skip; Rose, Kelly; Pancake, Jim; Bruner, Kathy (EG& G Services) [EG& G Services; Kuuskraa, Vello; Billingsley, Randy (Advanced Resources International) [Advanced Resources International

    2003-02-28T23:59:59.000Z

    In 2000, NETL conducted a review of the adequacy of the resource characterization databases used in its Gas Systems Analysis Model (GSAM). This review indicated that the most striking deficiency in GSAMs databases was the poor representation of the vast resource believed to exist in low-permeability sandstone accumulations in western U.S. basins. The models databases, which are built primarily around the United States Geological Survey (USGS) 1995 National Assessment (for undiscovered resources), reflected an estimate of the original-gas-inplace (OGIP) only in accumulations designated technically-recoverable by the USGS roughly 3% to 4% of the total estimated OGIP of the region. As these vast remaining resources are a prime target of NETL programs, NETL immediately launched an effort to upgrade its resource characterizations. Upon review of existing data, NETL concluded that no existing data were appropriate sources for its modeling needs, and a decision was made to conduct new, detailed log-based, gas-in-place assessments.

  14. Community Readiness Assessments | Department of Energy

    Energy Savers [EERE]

    Community Readiness Assessments Better Buildings Residential Network Program Sustainability Peer Exchange Call Series: Community Readiness Assessments, Call Slides and...

  15. INEEL Source Water Assessment

    SciTech Connect (OSTI)

    Sehlke, Gerald

    2003-03-01T23:59:59.000Z

    The Idaho National Engineering and Environmental Laboratory (INEEL) covers approximately 890 mi2 and includes 12 public water systems that must be evaluated for Source water protection purposes under the Safe Drinking Water Act. Because of its size and location, six watersheds and five aquifers could potentially affect the INEELs drinking water sources. Based on a preliminary evaluation of the available information, it was determined that the Big Lost River, Birch Creek, and Little Lost River Watersheds and the eastern Snake River Plain Aquifer needed to be assessed. These watersheds were delineated using the United States Geologic Surveys Hydrological Unit scheme. Well capture zones were originally estimated using the RESSQC module of the Environmental Protection Agencys Well Head Protection Area model, and the initial modeling assumptions and results were checked by running several scenarios using Modflow modeling. After a technical review, the resulting capture zones were expanded to account for the uncertainties associated with changing groundwater flow directions, a thick vadose zone, and other data uncertainties. Finally, all well capture zones at a given facility were merged to a single wellhead protection area at each facility. A contaminant source inventory was conducted, and the results were integrated with the well capture zones, watershed and aquifer information, and facility information using geographic information system technology to complete the INEELs Source Water Assessment. Of the INEELs 12 public water systems, three systems rated as low susceptibility (EBR-I, Main Gate, and Gun Range), and the remainder rated as moderate susceptibility. No INEEL public water system rated as high susceptibility. We are using this information to develop a source water management plan from which we will subsequently implement an INEEL-wide source water management program. The results are a very robust set of wellhead protection areas that will protect the INEELs public water systems yet not too conservative to inhibit the INEEL from carrying out its missions.

  16. Cassini data assessment report

    SciTech Connect (OSTI)

    NONE

    1998-08-01T23:59:59.000Z

    On October 15, 1997, the Cassini spacecraft was launched from Cape Canaveral Air Station (CCAS) and is now on its way to the planet Saturn. The functional support provided to NASA by DOE included the Advance Launch Support Group (ALSG). If there had been a launch anomaly, the ALSG would have provided a level of radiological emergency response support adequate to transition into a Federal Radiological Monitoring and Assessment Center (FRMAC). Additional functional radiological emergency response support, as part of the ALSG, included the: (1) Aerial Measurement System (AMS); (2) Atmospheric Release Advisory Capability (ARAC); (3) Geographic Information System (GIS); (4) Emergency Response Data System (ERDS); (5) Radiation Emergency Assistance Center and Training Site (REAC/TS); (6) Field monitoring and sampling; (7) Radioanalysis via RASCAL; (8) Source recovery; and (9) Neutron dosimetry and communications support. This functional support provided the capability to rapidly measure and assess radiological impacts from a launch anomaly. The Radiological Control Officer (RCO) on KSC established a Radiological Control Center (RADCC) as the focal point for all on-site and off-site radiological data and information flow. Scientists and radiological response personnel located at the RADCC managed the field monitoring team on the KSC/CCAS federal properties. Off-site radiological emergency response activities for all public lands surrounding the KSC/CCAS complex were coordinated through the Off-site ALSG located at the National Guard Armory in Cocoa, Florida. All of the in situ measurement data of good quality gathered during the dry run, the first launch attempt and the launch day are listed in this document. The RASCAL analysis results of the air filters and impactor planchets are listed.

  17. Information needs for risk assessment

    SciTech Connect (OSTI)

    DeRosa, C.T.; Choudhury, H.; Schoeny, R.S.

    1990-12-31T23:59:59.000Z

    Risk assessment can be thought of as a conceptual approach to bridge the gap between the available data and the ultimate goal of characterizing the risk or hazard associated with a particular environmental problem. To lend consistency to and to promote quality in the process, the US Environmental Protection Agency (EPA) published Guidelines for Risk Assessment of Carcinogenicity, Developmental Toxicity, Germ Cell Mutagenicity and Exposure Assessment, and Risk Assessment of Chemical Mixtures. The guidelines provide a framework for organizing the information, evaluating data, and for carrying out the risk assessment in a scientifically plausible manner. In the absence of sufficient scientific information or when abundant data are available, the guidelines provide alternative methodologies that can be employed in the risk assessment. 4 refs., 3 figs., 2 tabs.

  18. Pollutant Assessments Group Procedures Manual

    SciTech Connect (OSTI)

    Chavarria, D.E.; Davidson, J.R.; Espegren, M.L.; Kearl, P.M.; Knott, R.R.; Pierce, G.A.; Retolaza, C.D.; Smuin, D.R.; Wilson, M.J.; Witt, D.A. (Oak Ridge National Lab., TN (USA)); Conklin, N.G.; Egidi, P.V.; Ertel, D.B.; Foster, D.S.; Krall, B.J.; Meredith, R.L.; Rice, J.A.; Roemer, E.K. (Oak Ridge Associated Universities, Inc., TN (USA))

    1991-02-01T23:59:59.000Z

    This procedures manual combines the existing procedures for radiological and chemical assessment of hazardous wastes used by the Pollutant Assessments Group at the time of manuscript completion (October 1, 1990). These procedures will be revised in an ongoing process to incorporate new developments in hazardous waste assessment technology and changes in administrative policy and support procedures. Format inconsistencies will be corrected in subsequent revisions of individual procedures.

  19. 2011 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2012-03-20T23:59:59.000Z

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC, 2007a) requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs), with the results submitted annually to U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE, 1999a; 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2011. This annual summary report presents data and conclusions from the FY 2011 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R and D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) (formerly the Nevada Test Site) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R and D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2011 include the following: (1) Operation of a new shallow land disposal unit and a new Resource Conservation and Recovery Act (RCRA)-compliant lined disposal unit at the Area 5 RWMS; (2) Development of new closure inventory estimates based on disposals through FY 2011; (3) Evaluation of new or revised waste streams by special analysis; (4) Development of version 2.102 of the Area 3 RWMS GoldSim PA model; and (5) Development of version 4.113 of the Area 5 RWMS GoldSim PA model. Analysis of the latest available data using the Area 5 RWMS v4.113 GoldSim PA model indicates that all performance objectives can be met. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. In FY 2011, there were no operational changes, monitoring results, or R and D results for the Area 3 RWMS that would impact PA validity. Despite the increase in waste volume and inventory at the Area 3 RWMS since 1996 when the PA was approved, the facility performance evaluated with the Area 3 RWMS PA GoldSim model, version 2.0 (with the final closure inventory), remains well below the performance objectives set forth in U.S. Department of Energy Order DOE O 435.1, 'Radioactive Waste Management' (DOE, 2001). The conclusions of the Area 3 RWMS PA remain valid. A special analysis was prepared to update the PA and CA results for the Area 3 RWMS in FY 2011. Release of the special analysis is planned for FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. Inclusion of the Frenchman Flat Underground Test Area (UGTA) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the closure report for the Frenchman Flat UGTA corrective action unit (CAU) in FY 2015. An industrial site, CAU 547, with corrective action sites near the Area 3 RWMS was found to have a significant plutonium inventory in 2009. CAU 547 will be evaluated for inclusion of future revisions or updates of the Area 3 RWMS CA. The revision of the Area 3 RWMS CA, which will include the UGTA source terms, is expected in FY 2024, following the completion of the Yucca Flat CAU Corrective Action Decision Document, scheduled for FY 2023. Near-term R and D efforts will focus on continuing development of the Are

  20. Management and Independent Assessments Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-03-27T23:59:59.000Z

    The Guide reflects updated standards for assessment practices, international standards, and changes in DOE expectations related to quality assurance (QA). Cancels DOE G 414.1-1B.

  1. Environmental Assessment (Nova Scotia, Canada)

    Broader source: Energy.gov [DOE]

    Nova Scotia Environment conducts environmental assessments on projects and developments to ensure they adhere to the laws and regulations of the province. Developments required to undergo an...

  2. Industrial Process Heating - Technology Assessment

    Office of Environmental Management (EM)

    opportunities for technology improvements that can benefit from 146 high-performance computing (HPC) approaches. 147 148 In the next section, the technology assessment...

  3. An Impact Assessment Model for Distributed Adaptive Security Situation Assessment*

    E-Print Network [OSTI]

    California at Davis, University of

    1 An Impact Assessment Model for Distributed Adaptive Security Situation Assessment* Mark Heckman mechanism is not simply to stop attacks, but to protect a computing resource so that the resource can continue to perform its function. A computing resource, however, is only a component of a larger system

  4. Forestry Commission Equality Impact Assessment 1 Equality Impact Assessment summary

    E-Print Network [OSTI]

    Forestry Commission Equality Impact Assessment 1 Equality Impact Assessment summary Step 10 Name and programmes by which Forestry Commission Wales will help to deliver Woodlands for Wales ­ the Wales woodland of Demographic Equality Strands (2006) National Assembly for Wales · Forestry Commission survey of visitors

  5. SEASONAL RECLAIMED WATER QUALITY; AN ASSESSMENT OFQUALITY; AN ASSESSMENT OF

    E-Print Network [OSTI]

    Fay, Noah

    these concerns? Waste Water Treatment Facilities treat water to Waste Water Treatment Facilities treat water and disinfect anyy microorganisms that may be present The majority of Recycled water produced in ArizonaSEASONAL RECLAIMED WATER QUALITY; AN ASSESSMENT OFQUALITY; AN ASSESSMENT OF BIOLOGICAL VARIABILITY

  6. High Temperatures & Electricity Demand

    E-Print Network [OSTI]

    High Temperatures & Electricity Demand An Assessment of Supply Adequacy in California Trends.......................................................................................................1 HIGH TEMPERATURES AND ELECTRICITY DEMAND.....................................................................................................................7 SECTION I: HIGH TEMPERATURES AND ELECTRICITY DEMAND ..........................9 BACKGROUND

  7. On June 21, 2011, the HASQARD Focus Group approved the following...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    assessment is to evaluate the following: * Effectiveness of the management control systems that are established to achieve and assure quality * Adequacy of resources and...

  8. Northeast United States U.S. Department of Energy Office of Electricit...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Energy...

  9. Service Assessment Hurricane Floyd Floods

    E-Print Network [OSTI]

    Service Assessment Hurricane Floyd Floods of September 1999 mm r u, /"' r U.S.DEPARTMENTOF COMMERCE: Hurricane Floyd Floods of September 1999. Aerial view of Grifton, North Carolina, with flooding from the Neuse River. (Photograph courtesy of the U.S. Army Corps of Engineers.) #12;Service Assessment Hurricane

  10. , SdrviceAssessment Hurricane Katrina

    E-Print Network [OSTI]

    , SdrviceAssessment c . Hurricane Katrina August 23-31,2005 b U.S. DEPARTMENT OF COMMERCE National;Cover: NOAA-15 satellite image of HurricaneKatrina at 7:47 a.m. Central Daylight Time, August 29,2005,just east of New Orleans, Louisiana. #12;ServiceAssessment Hurricane Katrina August 23-31,2005 June

  11. College of Charleston Assessment Template

    E-Print Network [OSTI]

    Kunkle, Tom

    @cofc.edu Phone: 3-7163 Office address: Silcox Physical Education Center, Office 317 Administrative Unit director (deans, vice presidents, etc.) receiving assessment updates: Dr. Frances Welch, Dean ­ School of Education, Health, and Human Performance; Dr. Sara Davis, Associate Dean for Accountability, Assessment

  12. Environmental Health and Safety Assessment

    E-Print Network [OSTI]

    Pawlowski, Wojtek

    Environmental Health and Safety Assessment Program Manual 7/15/2013 #12;Environmental Health/26/2013. The most recent version of this document is available electronically at: http://sp.ehs.cornell.edu/env/general-environmental-management/environmental.........................................................................................................................4 #12;Environmental Health and Safety Assessment Program Manual Approved by: (Barb English) Last

  13. Appendix C: Hazardous Property Assessment

    E-Print Network [OSTI]

    Siddharthan, Advaith

    Appendix C: Hazardous Property Assessment The aim of this appendix is to: give advice on the hazards properties H1 to H14 identified in Annex III of the HWD; provide assessment methods and threshold concentrations for the hazards; and advise on which test methods should be considered

  14. Contract 98 Self-Assessment

    SciTech Connect (OSTI)

    Not Available

    1993-04-01T23:59:59.000Z

    This report documents the results of LBL`s Self-Assessment required by Appendix F to Contract DE ACOO3765F00098. This self assessment covers the performance measures set forth in Appendix F except those requiring an external audit. The performance measures for LBL are in the areas of ES&H Finance, Human Services and Procurement and Property. LBL is a multi-program laboratory operated by the University of California (UC) for DOE. The mission of LBL includes performing research in energy, general, and life sciences. LBL facilities include the main site on 130 acres located in the cities of Berkeley and Oakland; laboratories and offices located in buildings on the UC Berkeley Campus; and three leased buildings in the cities of Berkeley and Emeryville. 1. Involvement of Line Management in the assessment process to provide awareness and ownership. 2. Using existing assessments, audits and appraisals in lieu of a new assessment wherever possible. 3. Conduct of the assessments by individuals with functional responsibility and knowledge of the areas being assessed. 4. Interaction with individuals performing assessments at other Laboratories to enhance our learning process. As anticipated, a number of findings will require corrective action. General corrective actions are identified for key findings in this report. In early May 1993, this Laboratory will begin the development of detailed formal corrective action plans which will be entered into a laboratory automated corrective action tracking system.

  15. PERFORMANCE ASSESSMENT OF PID CONTROLLERS

    E-Print Network [OSTI]

    Marquez, Horacio J.

    PERFORMANCE ASSESSMENT OF PID CONTROLLERS W. Tan, H. J. Marquez, and T. Chen§ Abstract: Criteria based on disturbance rejection and system robustness are proposed to assess the performance of PID-loop or multi-loop. Key Words: PID Control; Tuning; Performance; Robustness; Structured Singular Value. 1

  16. Species for the screening assessment. Columbia River Comprehensive Impact Assessment

    SciTech Connect (OSTI)

    Becker, J.M.; Brandt, C.A.; Dauble, D.D.; Maughan, A.D.; O`Neil, T.K.

    1996-03-01T23:59:59.000Z

    Because of past nuclear production operations along the Columbia River, there is intense public and tribal interest in assessing any residual Hanford Site related contamination along the river from the Hanford Reach to the Pacific Ocean. The Columbia River Comprehensive Impact Assessment was proposed to address these concerns. The assessment of the Columbia River is being conducted in phases. The initial phase is a screening assessment of the risk, which addresses current environmental conditions for a range of potential uses. One component of the screening assessment estimates the risk from contaminants in the Columbia River to the environment. The objective of the ecological risk assessment is to determine whether contaminants from the Columbia River pose a significant threat to selected receptor species that exist in the river and riparian communities of the study area. This report (1) identifies the receptor species selected for the screening assessment of ecological risk and (2) describes the selection process. The species selection process consisted of two tiers. In Tier 1, a master species list was developed that included many plant and animal species known to occur in the aquatic and riparian systems of the Columbia River between Priest Rapids Dam and the Columbia River estuary. This master list was reduced to 368 species that occur in the study area (Priest Rapids Dam to McNary Dam). In Tier 2, the 181 Tier 1 species were qualitatively ranked based on a scoring of their potential exposure and sensitivity to contaminants using a conceptual exposure model for the study area.

  17. RANGELAND SEQUESTRATION POTENTIAL ASSESSMENT

    SciTech Connect (OSTI)

    Lee Spangler; George F. Vance; Gerald E. Schuman; Justin D. Derner

    2012-03-31T23:59:59.000Z

    Rangelands occupy approximately half of the world's land area and store greater than 10% of the terrestrial biomass carbon and up to 30% of the global soil organic carbon. Although soil carbon sequestration rates are generally low on rangelands in comparison to croplands, increases in terrestrial carbon in rangelands resulting from management can account for significant carbon sequestration given the magnitude of this land resource. Despite the significance rangelands can play in carbon sequestration, our understanding remains limited. Researchers conducted a literature review to identify sustainably management practices that conserve existing rangeland carbon pools, as well as increase or restore carbon sequestration potentials for this type of ecosystem. The research team also reviewed the impact of grazing management on rangeland carbon dynamics, which are not well understood due to heterogeneity in grassland types. The literature review on the impact of grazing showed a wide variation of results, ranging from positive to negative to no response. On further review, the intensity of grazing appears to be a major factor in controlling rangeland soil organic carbon dynamics. In 2003, researchers conducted field sampling to assess the effect of several drought years during the period 1993-2002. Results suggested that drought can significantly impact rangeland soil organic carbon (SOC) levels, and therefore, carbon sequestration. Resampling was conducted in 2006; results again suggested that climatic conditions may have overridden management effects on SOC due to the ecological lag of the severe drought of 2002. Analysis of grazing practices during this research effort suggested that there are beneficial effects of light grazing compared to heavy grazing and non-grazing with respect to increased SOC and nitrogen contents. In general, carbon storage in rangelands also increases with increased precipitation, although researchers identified threshold levels of precipitation where sequestration begins to decrease.

  18. Coupling GIS and LCA for biodiversity assessments of land use: Part 2: Impact assessment

    E-Print Network [OSTI]

    Geyer, Roland; Lindner, Jan P.; Stoms, David M.; Davis, Frank W.; Wittstock, Bastian

    2010-01-01T23:59:59.000Z

    ignored in life cycle assessment (LCA). Some productionexplicit manner, while life cycle assessment (LCA) does notuse impacts in life cycle assessment. Int J LCA 11(5):363

  19. IMPORTANCE OF SAFETY CULTURE ASSESSMENT

    SciTech Connect (OSTI)

    Spitalnik, J.

    2004-10-06T23:59:59.000Z

    Safety Management has lately been considered by some Nuclear Regulatory agencies as the tool on which to concentrate their efforts to implement modern regulation structures, because Safety Culture was said to be difficult to monitor. However, Safety Culture can be assessed and monitored even if it is problematical to make Safety Culture the object of regulation. This paper stresses the feasibility and importance of Safety Culture Assessment based on self-assessment applications performed in several nuclear organizations in Latin America. Reasons and ownership for assessing Safety Culture are discussed, and relevant aspects considered for setting up and programming such an assessment are shown. Basic principles that were taken into account, as well as financial and human resources used in actual self-assessments are reviewed, including the importance of adequate statistical analyses and the necessity of proper feed-back of results. The setting up of action plans to enhance Safety Culture is the final step of the assessment program that once implemented will enable to establish a Safety Culture monitoring process within the organization.

  20. Criteria for assessing the quality of nuclear probabilistic risk assessments

    E-Print Network [OSTI]

    Zhu, Yingli, 1976-

    2004-01-01T23:59:59.000Z

    The final outcome of a nuclear Probabilistic Risk Assessment (PRA) is generally inaccurate and imprecise. This is primarily because not all risk contributors are addressed in the analysis, and there are state-of-knowledge ...

  1. System Assessment Standards: Defining the Market for Assessment Services

    E-Print Network [OSTI]

    McKane, A. T.; Sheaffer, P. E.

    2008-01-01T23:59:59.000Z

    potential. A significant barrier to realizing this potential is the lack of market definition for system energy efficiency assessment services. This creates problems for service providers in establishing market value for their services and problems...

  2. ASSESSMENT POLICY and PRACTICE University of Strathclyde

    E-Print Network [OSTI]

    Azzopardi, Leif

    , the bulk of this section is the presentation of Twelve Principles of Good Assessment Practice in relation ASSESSMENT POLICY and PRACTICE Twelve Principles of Good Assessment Practice Assessment practice has been- 1 - ASSESSMENT POLICY and PRACTICE University of Strathclyde Introduction This document presents

  3. TMCC WIND RESOURCE ASSESSMENT

    SciTech Connect (OSTI)

    Turtle Mountain Community College

    2003-12-30T23:59:59.000Z

    North Dakota has an outstanding resource--providing more available wind for development than any other state. According to U.S. Department of Energy (DOE) studies, North Dakota alone has enough energy from good wind areas, those of wind power Class 4 and higher, to supply 36% of the 1990 electricity consumption of the entire lower 48 states. At present, no more than a handful of wind turbines in the 60- to 100-kilowatt (kW) range are operating in the state. The first two utility-scale turbines were installed in North Dakota as part of a green pricing program, one in early 2002 and the second in July 2002. Both turbines are 900-kW wind turbines. Two more wind turbines are scheduled for installation by another utility later in 2002. Several reasons are evident for the lack of wind development. One primary reason is that North Dakota has more lignite coal than any other state. A number of relatively new minemouth power plants are operating in the state, resulting in an abundance of low-cost electricity. In 1998, North Dakota generated approximately 8.2 million megawatt-hours (MWh) of electricity, largely from coal-fired plants. Sales to North Dakota consumers totaled only 4.5 million MWh. In addition, the average retail cost of electricity in North Dakota was 5.7 cents per kWh in 1998. As a result of this surplus and the relatively low retail cost of service, North Dakota is a net exporter of electricity, selling approximately 50% to 60% of the electricity produced in North Dakota to markets outside the state. Keeping in mind that new electrical generation will be considered an export commodity to be sold outside the state, the transmission grid that serves to export electricity from North Dakota is at or close to its ability to serve new capacity. The markets for these resources are outside the state, and transmission access to the markets is a necessary condition for any large project. At the present time, technical assessments of the transmission network indicate that the ability to add and carry wind capacity outside of the state is limited. Identifying markets, securing long-term contracts, and obtaining a transmission path to export the power are all major steps that must be taken to develop new projects in North Dakota.

  4. Fiscal Year 2009 Revegetation Assessment

    SciTech Connect (OSTI)

    Michael Lewis

    2009-10-01T23:59:59.000Z

    This report summarizes the Fiscal Year 2009 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Recommendation(s) for each site.

  5. Fiscal Year 2010 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom; Mike Lewis

    2010-11-01T23:59:59.000Z

    This report summarizes the Fiscal Year 2010 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Recommendation(s) for each site.

  6. Fort Carson Wind Resource Assessment

    SciTech Connect (OSTI)

    Robichaud, R.

    2012-10-01T23:59:59.000Z

    This report focuses on the wind resource assessment, the estimated energy production of wind turbines, and economic potential of a wind turbine project on a ridge in the southeastern portion of the Fort Carson Army base.

  7. SRR Rangeland Ecosystem Services Assessment

    E-Print Network [OSTI]

    Wyoming, University of

    derived from rangelands Link between the biophysical world and the social systems humans use Basic Fish Huntable or Catchable fish and wildlife Biofuels Fiber Biochemicals Genetic material #12 Assess biological, hydrological, atmospheric, and other physical resources (supply) Describe the market

  8. Utility View of Risk Assessment

    E-Print Network [OSTI]

    Bickham, J.

    This paper will address a utility perspective in regard to risk assessment, reliability, and impact on the utility system. Discussions will also include the critical issues for utilities when contracting for energy and capacity from cogenerators...

  9. Fiscal Year 2012 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2012-11-01T23:59:59.000Z

    This report summarizes the Fiscal Year 2012 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Ten disturbed sites were evaluated for this assessment. Six have achieved final stabilization. The remaining four sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  10. Fiscal Year 2013 Revegetation Assessment

    SciTech Connect (OSTI)

    Jenifer Nordstrom

    2013-11-01T23:59:59.000Z

    This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

  11. Renewable Energy Property Tax Assessment

    Broader source: Energy.gov [DOE]

    Photovoltaic (PV) and wind energy facilities with a capacity of 2 megawatts (MW) AC or less are assessed locally for property taxes. Additionally, low impact hydro, geothermal, and biomass facili...

  12. Carbon Park Environmental Impact Assessment

    E-Print Network [OSTI]

    of offsetting the University's carbon footprint, promoting biodiversity and establishing easily maintained Carbon Park Environmental Impact Assessment A B.E.S.T. Project By, Adam Bond 2011 #12; Bishop's University Carbon Park

  13. University of Saskatchewan Sustainability Assessment

    E-Print Network [OSTI]

    Peak, Derek

    Management for Sustainability Energy Transportation Waste #12;Executive Summary Page 2 of 90 UUniversity of Saskatchewan Sustainability Assessment Prepared by: Kerri Klein Sustainable, Micheal Molaro and Jennifer Menzies) for their confidence in the vision of a sustainable University

  14. ASSESSMENT OF HOUSEHOLD CARBON FOOTPRINT REDUCTION POTENTIALS

    E-Print Network [OSTI]

    Masanet, Eric

    2010-01-01T23:59:59.000Z

    methodknownaslife?cycleassessment (LCA),whichisaInput?OutputLifeCycleAssessment(EIO? LCA)model. Input?OutputLife?Cycle Assessment(EIO?LCA)model(

  15. Life-cycle Assessment of Semiconductors

    E-Print Network [OSTI]

    Boyd, Sarah B.

    2009-01-01T23:59:59.000Z

    yield. A hybrid life cycle assessment (LCA) model is used;more accurate life-cycle assessment (LCA) of electronicthe purposes of life-cycle assessment (LCA). While it may be

  16. Viability Assessment Volume 4

    SciTech Connect (OSTI)

    DOE

    1998-12-01T23:59:59.000Z

    Volume 4 provides the DOE plan and cost estimate for the remaining work necessary to proceed from completing this VA to submitting an LA to NRC. This work includes preparing an EIS and evaluating the suitability of the site. Both items are necessary components of the documentation required to support a decision in 2001 by the Secretary of Energy on whether or not to recommend that the President approve the site for development as a repository. If the President recommends the site to Congress and the site designation becomes effective, then DOE will submit the LA to NRC in 2002 for authorization to construct the repository. The work described in Volume 4 constitutes the last step in the characterization of the Yucca Mountain site and the design and evaluation of the performance of a repository system in the geologic setting of this site. The plans in this volume for the next 4 years' work are based on the results of the previous 15 years' work, as reported in Volumes 1, 2, and 3 of this VA. Volume 1 summarizes what DOE has learned to date about the Yucca Mountain site. Volume 2 describes the current, reference repository design, several design options that might enhance the performance of the reference design, and several alternative designs that represent substantial departures from the reference design. Volume 2 also summarizes the results of tests of candidate materials for waste packages and for support of the tunnels into which waste would be emplaced. Volume 3 provides the results of the latest performance assessments undertaken to evaluate the performance of the design in the geologic setting of Yucca Mountain. The results described in Volumes 1, 2, and 3 provide the basis for identifying and prioritizing the work described in this volume. DOE believes that the planned work, together with the results of previous work, will be sufficient to support a site suitability evaluation for site recommendation and, if the site is recommended and designated, a defensible LA. Volume 4 is divided into seven sections. Section 2 presents a rationale and summary for the technical work to be done to develop the preclosure and postclosure safety cases that will support the compliance evaluations required for the evaluation of site suitability and for licensing. Section 2 also describes other necessary technical work, including that needed to support design decisions and development of the necessary design information. Section 3 presents a more detailed description of the technical work required to address the issues identified in Section 2. Section 3 also describes activities that will continue after submittal of the site recommendation and the LA. Examples include the drift scale heater test in the Exploratory Studies Facility (Section 3.1.4.3) and long-term waste package corrosion testing (Section 3.2.2.9). Section 4 discusses the statutory and regulatory framework for site recommendation and submittal of an LA, and describes the activities and documentation that must be completed to achieve these milestones, including the development of an EIS. Section 5 describes the numerous activities required to support program milestones, including support for completing the testing program, continuing tests as part of the performance confirmation program, and managing information and records to support regulatory and legal review. Sections 6 and 7 provide cost and schedule information for the activities planned.

  17. Transboundary aquifers: Southwestern states assess

    E-Print Network [OSTI]

    Wythe, Kathy

    2008-01-01T23:59:59.000Z

    tx H2O | pg. 14 Southwestern states assess Researchers from three universities in Texas, New Mexico, and Arizona and from the U.S. Geological Survey (USGS) are partnering on a new project to evaluate aquifers that span the United States... and Mexico borders. The federally funded project, known as United States-Mexico Transboundary Aquifer Assessment, will provide a scientific foundation for state and local officials to address pressing water resources challenges in the United States...

  18. Guam Initial Technical Assessment Report

    SciTech Connect (OSTI)

    Baring-Gould, I.; Conrad, M.; Haase, S.; Hotchkiss, E.; McNutt, P.

    2011-04-01T23:59:59.000Z

    Under an interagency agreement, funded by the Department of Interior's (DOI) Office of Insular Affairs (OIA), the National Renewable Energy Laboratory (NREL) was tasked to deliver technical assistance to the island of Guam by conducting an island initial technical assessment that would lay out energy consumption and production data and establish a baseline. This assessment will be used to conduct future analysis and studies by NREL that will estimate energy efficiency and renewable energy potential for the island of Guam.

  19. NREL's FY09 CSP Resource Assessment Plans: Solar Resource Assessment Workshop

    SciTech Connect (OSTI)

    Renne, D.

    2008-10-29T23:59:59.000Z

    Solar Resource Assessment Workshop, Denver CO, Oct 29, 2008 presentation: NREL's FY09 CSP Resource Assessment Plans

  20. Ecosystem Vulnerability Assessment - Patterns of Climate Change...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ecosystem Vulnerability Assessment - Patterns of Climate Change Vulnerability in the Southwest Ecosystem Vulnerability Assessment - Patterns of Climate Change Vulnerability in the...

  1. NREL: International Activities - Biomass Resource Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Biomass Resource Assessment Map showing annual productivity of marginal lands in APEC economies. Biomass resource assessments quantify the existing or potential biomass material in...

  2. Sandia National Laboratories: tidal energy resource assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    resource assessment Tidal Energy Resource Assessment in the East River Tidal Strait, New York On April 1, 2014, in Energy, News, News & Events, Partnership, Renewable Energy, Water...

  3. Colorado State University Industrial Assessment Center Saves...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industrial Assessment Center, inspects equipment at a manufacturing facility during an energy audit. | Photo courtesy of University of Missouri IAC. Industrial Assessment Centers...

  4. Innovative Exploration Techniques for Geothermal Assessment at...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Techniques for Geothermal Assessment at Jemez Pueblo, New Mexico Innovative Exploration Techniques for Geothermal Assessment at Jemez Pueblo, New Mexico Innovative Exploration...

  5. Technical Position, Regarding Acceptable Methods for Assessing...

    Office of Environmental Management (EM)

    Regarding Acceptable Methods for Assessing and Recording Radiation Doses to Individuals Technical Position, Regarding Acceptable Methods for Assessing and Recording Radiation Doses...

  6. EV Guideline Assessment Templates | Department of Energy

    Energy Savers [EERE]

    EV Guideline Assessment Templates More Documents & Publications EV Guideline Assessment Templates NDIAPMSCEVMSIntentGuideNov2006.pdf Earned Value Management System RM...

  7. Environmental Impact Statements and Environmental Assessments...

    Energy Savers [EERE]

    Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the...

  8. The Environmental Style: Writing Environmental Assessments and...

    Energy Savers [EERE]

    The Environmental Style: Writing Environmental Assessments and Impact Statements The Environmental Style: Writing Environmental Assessments and Impact Statements A writing guide...

  9. assessments: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Websites Summary: technology analysis Noon Lunch 1:15 California off-shore wind technology assessment 1:45 Technical assessmentRESEARCH RESULTS FORUM FOR RENEWABLE ENERGY...

  10. Enterprise Assessments, Oak Ridge National Laboratory Irradiated...

    Energy Savers [EERE]

    and Health Assessments conducted an independent assessment of the safety-significant ventilation systems at the Oak Ridge National Laboratory (ORNL) Irradiated Fuels...

  11. Verification and Validation of Facilities Procedures Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Verification and Validation of Facilities Procedures Assessment Plan NNSANevada Site Office Independent Oversight Division Performance Objective: The purpose of this assessment is...

  12. Tribal Renewable Energy Foundational Course: Assessing Energy...

    Office of Environmental Management (EM)

    Assessing Energy Needs and Resources Tribal Renewable Energy Foundational Course: Assessing Energy Needs and Resources Watch the U.S. Department of Energy Office of Indian Energy...

  13. Federal Radiological Monitoring and Assessment Center | National...

    National Nuclear Security Administration (NNSA)

    Mission The mission of the FRMAC is to coordinate and manage all federal radiological environmental monitoring and assessment Federal Radiological Monitoring and Assessment...

  14. Environmental Assessments (EA) | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    February 12, 2015 EA-1976D: Draft Environmental Assessment Emera CNG, LLC Compressed Natural Gas Project, Florida February 10, 2015 EA-2002: Final Environmental Assessment...

  15. UCSF Sustainability Baseline Assessment: Carbon Footprint Analysis

    E-Print Network [OSTI]

    Yamamoto, Keith

    UCSF Sustainability Baseline Assessment: Carbon Footprint Analysis Final Issue Date: March 21, 2010 #12;Carbon Footprint Analysis Background This chapter of the Sustainability Assessment focuses on UCSF

  16. Climate VISION: Resources and Links - Plant Assessments

    Office of Scientific and Technical Information (OSTI)

    of industrial manufacturing, are successful and commercially proven. Energy Productivity and Waste Assessments (Industrial Assessment Centers) If you run a small- to...

  17. Independent Oversight Assessment, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Waste Treatment and Immobilization Plant - January 2012 Independent Oversight Assessment, Waste Treatment and Immobilization Plant - January 2012 January 2012 Assessment of the...

  18. Environmental Impact Assessment (New Brunswick, Canada)

    Broader source: Energy.gov [DOE]

    Environmental Impact Assessment (EIA) is a process through which the environmental impacts potentially resulting from a proposed project are identified and assessed early in the planning process....

  19. assessing health impacts: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Commission Equality Impact Assessment Forestry Commission Equality Impact Assessment Renewable Energy Websites Summary: Forestry Commission Equality Impact Assessment Forestry...

  20. Final Environmental Assessment, Burleigh County Wind Energy Center

    Broader source: Energy.gov (indexed) [DOE]

    Assessment Environmental Assessment Environmental Assessment Burleigh County Wind Energy Center Burleigh County, North Dakota Final Burleigh County Wind, LLC BASIN...

  1. Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment

    SciTech Connect (OSTI)

    NONE

    1997-04-01T23:59:59.000Z

    To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting from current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.

  2. Ann Williamson, Deputy Director, Office of Environmental Assessment Mike Cox, Manager, Risk Assessment Unit, Office of Environmental Assessment

    E-Print Network [OSTI]

    Ann Williamson, Deputy Director, Office of Environmental Assessment Mike Cox, Manager, Risk Assessment Unit, Office of Environmental Assessment U.S. Environmental Protection Agency Region 10 Greg, WA Ann Williamson and Mike Cox, EPA Region 10 Office of Environmental Assessment, will be presenting

  3. Topaz II preliminary safety assessment

    SciTech Connect (OSTI)

    Marshall, A.C. (Sandia National Laboratories, Albuquerque, New Mexico 87185 (United States)); Standley, V. (Air Force Phillips Laboratory, Albuquerque, New Mexico 87110 (United States)); Voss, S.S. (Los Alamos National Laboratory, Los Alamos, New Mexico 87545 (United States)); Haskin, E. (Department of Chemical and Nuclear Engineering Department, Institute for Nuclear Power Studies, University of New Mexico, Albuquerque, New Mexico 87110 (United States))

    1993-01-10T23:59:59.000Z

    The Strategic Defense Initiative Organization (SDIO) decided to investigate the possibility of launching a Russian Topaz II space nuclear power system. A preliminary safety assessment was conducted to determine whether or not a space mission could be conducted safely and within budget constraints. As part of this assessment, a safety policy and safety functional requirements were developed to guide both the safety assessment and future Topaz II activities. A review of the Russian flight safety program was conducted and documented. Our preliminary safety assessment included a top level event tree, neutronic analysis of normal and accident configurations, an evaluation of temperature coefficients of reactivity, a reentry and disposal analysis, and analysis of postulated launch abort impact accidents, and an analysis of postulated propellant fire and explosion accidents. Based on the assessment, it appears that it will be possible to safely launch the Topaz II system in the U.S. with some possible system modifications. The principal system modifications will probably include design changes to preclude water flooded criticality and to assure intact reentry.

  4. Topaz II preliminary safety assessment

    SciTech Connect (OSTI)

    Marshall, A.C. (Sandia National Labs., Albuquerque, NM (United States)); Standley, V. (Air Force Phillips Laboratory, Albuquerque, NM (United States)); Voss, S.S. (Los Alamos National Lab., NM (United States)); Haskin, E. (New Mexico Univ., Albuquerque, NM (United States). Dept. of Chemical and Nuclear Engineering)

    1992-01-01T23:59:59.000Z

    The Strategic Defense Initiative Organization (SDIO) decided to investigate the possibility of launching a Russian Topaz 11 space nuclear power system. A preliminary safety assessment was conducted to determine whether or not a space mission could be conducted safely and within budget constraints. As part of this assessment, a safety policy and safety functional requirements were developed to guide both the safely assessment and future Topaz II activities. A review of the Russian flight safety program was conducted and documented. Our preliminary safety assessment included a top level event tree, neutronic analysis of normal and accident configurations, an evaluation of temperature coefficients of reactivity, a reentry and disposal analysis, and analysis of postulated launch abort impact accidents, and an analysis of postulated propellant fire and explosion accidents. Based on the assessment, it appears that it will be possible to safely launch the Topaz II system in the US with some possible system modifications. The principal system modifications will probably include design changes to preclude water flooded criticality and to assure intact reentry.

  5. Risk assessment in environmental management

    SciTech Connect (OSTI)

    Asante-Duah, D.K.

    1998-07-01T23:59:59.000Z

    This book is a straightforward exposition of US EPA-based procedures for the risk assessment and risk management of contaminated land, interwoven with discussions on some of the key fundamentals on the fate and transport of chemicals in the environment and the toxic action of environmental chemicals. The book is logically structured, commencing with a general overview of the principles of risk assessment and the interface with environmental legislation. There follows an introduction to environmental fate and transport, modeling, toxicology and uncertainty analysis, and a discussion of the elements of a risk assessment (site characterization, exposure analysis, toxic action and risk characterization), intake of a chemical with its environmental concentration and activity-related parameters such as inhalation rate and exposure time. The book concludes with a discussion on the derivation of risk-based action levels and remediation goals.

  6. MELCOR technical assessment at SNL

    SciTech Connect (OSTI)

    Kmetyk, L.N.; Tautges, T.J.

    1993-12-01T23:59:59.000Z

    MELCOR is a fully integrated, engineering-level computer code that models the progression of severe accidents in light water reactor (LWR) nuclear power plants, which is being developed at Sandia National Laboratories for the US Nuclear Regulatory Commission (US-NRC). The entire spectrum of severe accident phenomena, including reactor coolant system and containment thermal/hydraulic response, core heatup, degradation and relocation, and fission product release and transport, is treated in MELCOR in a unified framework for both boiling water reactors (PRWs). The MELCOR computer code has been developed to the point that is now being successfully applied in severe accident analyses, particularly in probabilistic risk assessment (PRA) studies. MELCOR was the first of the severe accident analysis code to undergo a formal peer review process. One of the major conclusions of the recent MELCOR Peer Review was the need for a more comprehensive and more systematic program of MELCOR assessment. This report provides a discussion of this technical assessment.

  7. Ion exchange technology assessment report

    SciTech Connect (OSTI)

    Duhn, E.F.

    1992-01-01T23:59:59.000Z

    In the execution of its charter, the SRS Ion Exchange Technology Assessment Team has determined that ion exchange (IX) technology has evolved to the point where it should now be considered as a viable alternative to the SRS reference ITP/LW/PH process. The ion exchange media available today offer the ability to design ion exchange processing systems tailored to the unique physical and chemical properties of SRS soluble HLW's. The technical assessment of IX technology and its applicability to the processing of SRS soluble HLW has demonstrated that IX is unquestionably a viable technology. A task team was chartered to evaluate the technology of ion exchange and its potential for replacing the present In-Tank Precipitation and proposed Late Wash processes to remove Cs, Sr, and Pu from soluble salt solutions at the Savannah River Site. This report documents the ion exchange technology assessment and conclusions of the task team.

  8. Ion exchange technology assessment report

    SciTech Connect (OSTI)

    Duhn, E.F.

    1992-12-31T23:59:59.000Z

    In the execution of its charter, the SRS Ion Exchange Technology Assessment Team has determined that ion exchange (IX) technology has evolved to the point where it should now be considered as a viable alternative to the SRS reference ITP/LW/PH process. The ion exchange media available today offer the ability to design ion exchange processing systems tailored to the unique physical and chemical properties of SRS soluble HLW`s. The technical assessment of IX technology and its applicability to the processing of SRS soluble HLW has demonstrated that IX is unquestionably a viable technology. A task team was chartered to evaluate the technology of ion exchange and its potential for replacing the present In-Tank Precipitation and proposed Late Wash processes to remove Cs, Sr, and Pu from soluble salt solutions at the Savannah River Site. This report documents the ion exchange technology assessment and conclusions of the task team.

  9. Colorado Statewide Forest Resource Assessment and Strategy

    E-Print Network [OSTI]

    Colorado Statewide Forest Resource Assessment and Strategy www.csfs.colostate.edu Colorado Forest resource assessments had to be completed by June 2010 ­ required to receive S&PF funds in the future (2008;Resource Assessment and Strategy Partners Resource Assessment and Strategy Partners Colorado Division

  10. ASSESSMENT AND CONTROL OF OTEC ECOLOGICAL IMPACTS

    E-Print Network [OSTI]

    Wilde, P.

    2012-01-01T23:59:59.000Z

    Division of Solar Energy, Environmental and Resource1978. Solar Program Assessment: Environmental Factors -

  11. Assessment Update 2009 Prepared: July 27, 2009

    E-Print Network [OSTI]

    Maxwell, Bruce D.

    1 Assessment Update 2009 Prepared: July 27, 2009 CHBE assessment activities during AY 2008 Thresholds Details of Assessment Activities Inputs Assessment Threshold Response Review The Faculty tightened) Safety in Senior Design Reports: I viewed the Coal Bed Methane Water Treatment Project and the Coal

  12. Perceptual quality assessment for compressed video

    E-Print Network [OSTI]

    Yang, Kai-Chieh

    2007-01-01T23:59:59.000Z

    5 Perceptual Temporal Quality Metric (Frame Interpolation Quality Metric . . . . . . . . . . . .Overview of Video Quality Assessment . . . . . . . . . . . .

  13. Assessing Uncertainty in Simulation Based Maritime Risk Assessment

    E-Print Network [OSTI]

    van Dorp, Johan Ren

    , such as nuclear powered vessels [6], vessels transporting liquefied natural gas [7] and offshore oil #12;2 and gas the decision-makers unsure whether the evidence was sufficient to assess specific risks and benefits. The first techniques to propagate uncertainty throughout the analysis. The conclusions drawn in the original study

  14. Integrated Environmental Assessment Part III: ExposureAssessment

    SciTech Connect (OSTI)

    McKone, Thomas E.; Small, Mitchell J.

    2006-06-01T23:59:59.000Z

    Human exposure assessment is a key step in estimating the environmental and public health burdens that result chemical emissions in the life cycle of an industrial product or service. This column presents the third in a series of overviews of the state of the art in integrated environmental assessment - earlier columns described emissions estimation (Frey and Small, 2003) and fate and transport modeling (Ramaswami, et al., 2004). When combined, these first two assessment elements provide estimates of ambient concentrations in the environment. Here we discuss how both models and measurements are used to translate ambient concentrations into metrics of human and ecological exposure, the necessary precursors to impact assessment. Exposure assessment is the process of measuring and/or modeling the magnitude, frequency and duration of contact between a potentially harmful agent and a target population, including the size and characteristics of that population (IPCS, 2001; Zartarian, et al., 2005). Ideally the exposure assessment process should characterize the sources, routes, pathways, and uncertainties in the assessment. Route of exposure refers to the way that an agent enters the receptor during an exposure event. Humans contact pollutants through three routes--inhalation, ingestion, and dermal uptake. Inhalation occurs in both outdoor environments and indoor environments where most people spend the majority of their time. Ingestion includes both water and food, as well as soil and dust uptake due to hand-to-mouth activity. Dermal uptake occurs through contacts with consumer products; indoor and outdoor surfaces; the water supply during washing or bathing; ambient surface waters during swimming or boating; soil during activities such as work, gardening, and play; and, to a lesser extent, from the air that surrounds us. An exposure pathway is the course that a pollutant takes from an ambient environmental medium (air, soil, water, biota, etc), to an exposure medium (indoor air, food, tap water, etc.) and to an exposed individual. Exposure scenarios are used to define plausible pathways for human contact. Recognition of the multiple pathways possible for exposure highlights the importance of a multimedia, multipathway exposure framework.

  15. A total risk assessment methodology for security assessment.

    SciTech Connect (OSTI)

    Aguilar, Richard; Pless, Daniel J.; Kaplan, Paul Garry; Silva, Consuelo Juanita; Rhea, Ronald Edward; Wyss, Gregory Dane; Conrad, Stephen Hamilton

    2009-06-01T23:59:59.000Z

    Sandia National Laboratories performed a two-year Laboratory Directed Research and Development project to develop a new collaborative risk assessment method to enable decision makers to fully consider the interrelationships between threat, vulnerability, and consequence. A five-step Total Risk Assessment Methodology was developed to enable interdisciplinary collaborative risk assessment by experts from these disciplines. The objective of this process is promote effective risk management by enabling analysts to identify scenarios that are simultaneously achievable by an adversary, desirable to the adversary, and of concern to the system owner or to society. The basic steps are risk identification, collaborative scenario refinement and evaluation, scenario cohort identification and risk ranking, threat chain mitigation analysis, and residual risk assessment. The method is highly iterative, especially with regard to scenario refinement and evaluation. The Total Risk Assessment Methodology includes objective consideration of relative attack likelihood instead of subjective expert judgment. The 'probability of attack' is not computed, but the relative likelihood for each scenario is assessed through identifying and analyzing scenario cohort groups, which are groups of scenarios with comparable qualities to the scenario being analyzed at both this and other targets. Scenarios for the target under consideration and other targets are placed into cohort groups under an established ranking process that reflects the following three factors: known targeting, achievable consequences, and the resources required for an adversary to have a high likelihood of success. The development of these target cohort groups implements, mathematically, the idea that adversaries are actively choosing among possible attack scenarios and avoiding scenarios that would be significantly suboptimal to their objectives. An adversary who can choose among only a few comparable targets and scenarios (a small comparable target cohort group) is more likely to choose to attack the specific target under analysis because he perceives it to be a relatively unique attack opportunity. The opposite is also true. Thus, total risk is related to the number of targets that exist in each scenario cohort group. This paper describes the Total Risk Assessment Methodology and illustrates it through an example.

  16. Transformer Efficiency Assessment - Okinawa, Japan

    SciTech Connect (OSTI)

    Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

    2012-05-01T23:59:59.000Z

    The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of key transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturers factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCBs actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

  17. Transformer Efficiency Assessment - Okinawa, Japan

    SciTech Connect (OSTI)

    Thomas L. Baldwin; Robert J. Turk; Kurt S. Myers; Jake P. Gentle; Jason W. Bush

    2012-08-01T23:59:59.000Z

    The US Army Engineering & Support Center, Huntsville (USAESCH), and the US Marine Corps Base (MCB), Okinawa, Japan retained Idaho National Laboratory (INL) to conduct a Transformer Efficiency Assessment of key transformers located at multiple military bases in Okinawa, Japan. The purpose of this assessment is to support the Marine Corps Base, Okinawa in evaluating medium voltage distribution transformers for potential efficiency upgrades. The original scope of work included the MCB providing actual transformer nameplate data, manufacturers factory test sheets, electrical system data (kWh), demand data (kWd), power factor data, and electricity cost data. Unfortunately, the MCBs actual data is not available and therefore making it necessary to de-scope the original assessment. Note: Any similar nameplate data, photos of similar transformer nameplates, and basic electrical details from one-line drawings (provided by MCB) are not a replacement for actual load loss test data. It is recommended that load measurements are performed on the high and low sides of transformers to better quantify actual load losses, demand data, and power factor data. We also recommend that actual data, when available, be inserted by MCB Okinawa where assumptions have been made and then the LCC analysis updated. This report covers a generalized assessment of modern U.S. transformers in a three level efficiency category, Low-Level efficiency, Medium-Level efficiency, and High-Level efficiency.

  18. Writing and Assessing Learning Outcomes

    E-Print Network [OSTI]

    Fernandez, Eduardo

    Outcomes... Are student-focused Focus on learning resulting from an activity rather than the activity outcomes) to describing effectiveness (Learning outcomes) Links Student Affairs and Academic Affairs; links curricular and co-curricular #12;Biggest challenges to assessing learning Students do

  19. Integrated Disposal Facility Risk Assessment

    SciTech Connect (OSTI)

    MANN, F. M.

    2003-06-03T23:59:59.000Z

    An environmental risk assessment associated with the disposal of projected Immobilized Low-Activity Waste, solid wastes and failed or decommissioned melters in an Integrated Disposal Facility was performed. Based on the analyses all performance objectives associated with the groundwater, air, and intruder pathways were met.

  20. College of Charleston Assessment Template

    E-Print Network [OSTI]

    Kunkle, Tom

    You. Date form Completed: 9/29/2011 Program Name and Type Physical Education Teacher Education@cofc.edu Phone: 3-8247 Office address: Silcox Physical Education Center, Office 312 Administrative Unit director (deans, vice presidents, etc.) receiving assessment updates: Dr. Frances Welch, Dean ­ School

  1. College of Charleston Assessment Template

    E-Print Network [OSTI]

    Kunkle, Tom

    You. Date form Completed: 9/29/2011 Program Name and Type Physical Education and Health, Health. Sue Balinsky Email: balinskys@cofc.edu Phone: 3-8242 Office address: Silcox Physical Education Center, Office 105 Administrative Unit director (deans, vice presidents, etc.) receiving assessment updates: Dr

  2. Hazards Survey and Hazards Assessments

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21T23:59:59.000Z

    This volume is to assist DOE Operations/Field Offices and operating contractors in complying with the DOE O 151.1 requirement that Hazards Surveys and facility-specific Hazards Assessments be prepared, maintained, and used for emergency planning purposes. Canceled by DOE G 151.1-2.

  3. Assessment Report Department of Economics

    E-Print Network [OSTI]

    Bogaerts, Steven

    1 Assessment Report Department of Economics August, 2012 Mission Statement The mission of the Economics Department is to impart knowledge, to both majors and non- majors, about the methods, core theory. Relation to the University at Large Economics is an important part of a liberal arts education because

  4. Assessment Report Department of Economics

    E-Print Network [OSTI]

    Bogaerts, Steven

    1 Assessment Report Department of Economics September, 2009 Mission Statement The mission of the Economics Department is to impart knowledge, to both majors and non-majors, about the methods, core theory discipline. Relation to the University at Large Economics is an important part of a liberal arts education

  5. College of Charleston Assessment Template

    E-Print Network [OSTI]

    Kasman, Alex

    College of Charleston Assessment Template Please copy completed form into Compliance Assist. Thank students for the fall of 2012. 3. Program Development: Survey students to determine the impact of program is preliminary official enrollment will be determined in October of 2012. We plan to survey 2011 Senior Project

  6. Information Technology Security Assessment Framework

    E-Print Network [OSTI]

    Federal Information Technology Security Assessment Framework November 28, 2000 Prepared (NIST) Computer Security Division #12;Overview Information and the systems that process it are among and maintain a program to adequately secure its information and system assets. Agency programs must: 1) assure

  7. Mental Health Clinic Intake Assessment

    E-Print Network [OSTI]

    Weiblen, George D

    Mental Health Clinic Intake Assessment Welcome to the Mental Health Clinic at Boynton Health Clinic. The Medical Social Worker can provide you with resources if you require an evaluation-- 612 Clinic utilizes a short-term model of psychotherapy. This means that we are able to offer eleven

  8. Assessment Plans College of Nursing

    E-Print Network [OSTI]

    Dyer, Bill

    . Identify clinical and cost outcomes that improve safety, effectiveness, timeliness, efficiency, quality 2014 Y Y Y #12;Doctor of Nursing Practice Degree (DNP) Program Learning Outcomes a. Produce a scholarly and defenses c. A statement on the assessment of the DNP degree program indicating if the program outcomes

  9. HVDC power transmission technology assessment

    SciTech Connect (OSTI)

    Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

    1997-04-01T23:59:59.000Z

    The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

  10. WESTERN WATER ASSESSMENT WHITE PAPER

    E-Print Network [OSTI]

    Neff, Jason

    the socio-economic effects of drought. Strategic Goals Following the findings and recommendations from two (outside of agriculture) Few "disaster" declarations Not even a unified roster of drought eventsWESTERN WATER ASSESSMENT WHITE PAPER Tracking Socioeconomic Impacts of Drought with Rapid Analytics

  11. CRAD, Configuration Management Assessment Plan

    Broader source: Energy.gov [DOE]

    The objective of this assessment is to determine whether a Configuration Management Program (CM) is in place which allows for the availability and retrievability of accurate information, improves response to design and operational decisions, enhances worker safety, increases facility safety and reliability, increases efficiency of work efforts, and helps maintain integrity of interfacing orders.

  12. Near Shore Submerged Oil Assessment

    E-Print Network [OSTI]

    Near Shore Submerged Oil Assessment September 2010 In the context of the BP Deepwater Horizon (DWH) oil spill in the Gulf of Mexico, submerged oil refers to near shore oil which has picked up sediments from very different physical and chemical processes. In this spill, the oil was released more than 5

  13. The social fabric of Jeans' Assessing the Social: Coupling social simulation and assessment

    E-Print Network [OSTI]

    Paris-Sud XI, Universit de

    . For instance, Life Cycle Assessment (LCA) (Guine, 2002) focuses more on the embedded resources consumption many are not intended as major forms of assessment. Physical assessment (e.g. Life Cycle Assessment (LCA)), monetary assessment (e.g. Cost Benefit Analysis (CBA)), scenario analysis (tools

  14. assess pozzolanic activity: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Ecology Websites Summary: 1 UNIVERSITY OF IDAHO STUDENT PROGRAMS ASSESSMENT Program Review and Assessment Activities......

  15. A Framework for Comparative Assessments of Energy Efficiency Policy Measures

    E-Print Network [OSTI]

    Blum, Helcio

    2012-01-01T23:59:59.000Z

    premise that the comparative assessment of energy efficiencypremise that the comparative assessment of energy efficiency

  16. Assessment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperational Management »EnergyHubs |

  17. Wind resource assessment: San Nicolas Island, California

    SciTech Connect (OSTI)

    McKenna, E. [National Renewable Energy Lab., Golden, CO (United States); Olsen, T.L. [Timothy L. Olsen Consulting, (United States)

    1996-01-01T23:59:59.000Z

    San Nicolas Island (SNI) is the site of the Navy Range Instrumentation Test Site which relies on an isolated diesel-powered grid for its energy needs. The island is located in the Pacific Ocean 85 miles southwest of Los Angeles, California and 65 miles south of the Naval Air Weapons Station (NAWS), Point Mugu, California. SNI is situated on the continental shelf at latitude N33{degree}14` and longitude W119{degree}27`. It is approximately 9 miles long and 3.6 miles wide and encompasses an area of 13,370 acres of land owned by the Navy in fee title. Winds on San Nicolas are prevailingly northwest and are strong most of the year. The average wind speed is 7.2 m/s (14 knots) and seasonal variation is small. The windiest months, March through July, have wind speeds averaging 8.2 m/s (16 knots). The least windy months, August through February, have wind speeds averaging 6.2 m/s (12 knots).

  18. S. 2375: a bill to disapprove of certain deferrals of Strategic Petroleum Reserve budget authority, to authorize additional appropriations with respect to the Strategic Petroleum Reserve, and to increase oil import fees. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, April 28, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01T23:59:59.000Z

    The purpose of this bill is to disapprove of certain deferrals of the Strategic Petroleum Reserve (SPR) budget authority, to authorize additional appropriations to the SPR, and to increase oil import fees. The bill authorizes $1 billion for fiscal years 1987, 88, and 89 for crude oil acquisitions for the SPR and $163 million for storage and related facility construction during 1987. It also instructs the Energy Secretary to cease production from the Naval Petroleum Reserve at Elk Hills for six months to allow the reservoir depletion to stabilize.

  19. Transboundary aquifers: Southwestern states assess

    E-Print Network [OSTI]

    Wythe, Kathy

    2008-01-01T23:59:59.000Z

    and Mexico borders. The federally funded project, known as United States-Mexico Transboundary Aquifer Assessment, will provide a scientific foundation for state and local officials to address pressing water resources challenges in the United States... heavily on groundwater in aquifers. Municipal and other water users are increasing their use of groundwater, raising concerns about the long-term quality and availability of this supply, Michelsen said. ?Groundwater is the major and, in many areas...

  20. Preliminary melter performance assessment report

    SciTech Connect (OSTI)

    Elliott, M.L.; Eyler, L.L.; Mahoney, L.A.; Cooper, M.F.; Whitney, L.D.; Shafer, P.J.

    1994-08-01T23:59:59.000Z

    The Melter Performance Assessment activity, a component of the Pacific Northwest Laboratory`s (PNL) Vitrification Technology Development (PVTD) effort, was designed to determine the impact of noble metals on the operational life of the reference Hanford Waste Vitrification Plant (HWVP) melter. The melter performance assessment consisted of several activities, including a literature review of all work done with noble metals in glass, gradient furnace testing to study the behavior of noble metals during the melting process, research-scale and engineering-scale melter testing to evaluate effects of noble metals on melter operation, and computer modeling that used the experimental data to predict effects of noble metals on the full-scale melter. Feed used in these tests simulated neutralized current acid waste (NCAW) feed. This report summarizes the results of the melter performance assessment and predicts the lifetime of the HWVP melter. It should be noted that this work was conducted before the recent Tri-Party Agreement changes, so the reference melter referred to here is the Defense Waste Processing Facility (DWPF) melter design.