National Library of Energy BETA

Sample records for federal power system

  1. Brochure: Federal Columbia River Power System (FCRPS)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    these agencies maximize the use of the Columbia River by generating power, protecting fish and wildlife, controlling floods, providing irrigation and navigation, and sustaining...

  2. Southwestern Federal Power System's Fiscal Year 2010 Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... presentation includes all of the hydroelectric generating and power operations of one ... of Southwestern and the related hydroelectric generating facilities and power ...

  3. AUDIT REPORT Western Federal Power System's Fiscal Year 2014...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... in certain multipurpose facilities, primarily dams and structures integral to hydroelectric power generation required to be repaid from the power revenues, has been ...

  4. Southwestern Federal Power System's Fiscal Year 2011 Financial...

    Energy Savers [EERE]

    ... requirements of the Corps hydroelectric power generation function to gain a better ... Utility plant includes items such as dams, spillways, generators, turbines, ...

  5. Southwestern Federal Power System's Fiscal Year 2012 Financial...

    Energy Savers [EERE]

    ... requirements of the Corps hydroelectric power generation function to gain a better ... Utility plant includes items such as dams, spillways, generators, turbines, ...

  6. Federal Incentives for Water Power

    SciTech Connect (OSTI)

    2013-04-05

    This factsheet lists the major federal incentives for water power technologies available as of April 2013.

  7. Purchasing Renewable Power for Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchasing Renewable Power for Federal Facilities Purchasing Renewable Power for Federal Facilities Federal agencies can purchase renewable power or renewable energy certificates ...

  8. Southeastern Federal Power Alliance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southeastern Federal Power Alliance Southeastern Federal Power Alliance Southeastern Federal Power Alliance logo Partners Advancing Clean, Reliable Hydropower Sensing a need for a ...

  9. SOUTHEASTERN FEDERAL POWER ALLIANCE- November 6, 2014

    Office of Energy Efficiency and Renewable Energy (EERE)

    Southeastern Federal Power Alliance meeting was held on November 6,2014 in the Martin Luther King, Jr. Federal Building in Atlanta, Georgia.

  10. Federal Incentives for Water Power (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-05-01

    This fact sheet describes the federal incentives available as of April 2013 for the development of water power technologies.

  11. PP-13 Federal Power Commission | Department of Energy

    Office of Environmental Management (EM)

    3 Federal Power Commission PP-13 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission ...

  12. Management Letter on the Western Federal Power System's Fiscal Year 2013 Financial Statement Audit

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Financial Statement Audit OAS-FS-15-04 December 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections KPMG LLP Suite 800 1225 17th Street Denver, CO 80202-5598 KPMG LLP is a Delaware limited liability partnership, the U.S. member firm of KPMG International Cooperative ("KPMG International"), a Swiss entity. September 5, 2014 The Administrator of Western Area Power Administration and the U.S. Department of Energy Office of the Inspector General:

  13. SOUTHEASTERN FEDERAL POWER ALLIANCE Sam Nunn Federal Building

    Office of Environmental Management (EM)

    SOUTHEASTERN FEDERAL POWER ALLIANCE Sam Nunn Federal Building 61 Forsyth Street SW, Atlanta, GA 30303 April 12, 2016 April 11, 2016: Meet on the Glenn Hotel roof at 5:30 p.m. to partake of the manager's welcome wine tasting reception. At 6:15 we will walk to Dutch-treat dinner at Der Biergarten, 300 Marietta St NW, Atlanta, GA 30313. April 12, 2016: The meeting will begin at 8:30 a.m. in the Sam Nunn Federal Building, Social Security Administration's conference room on the 20 th floor, Room

  14. Federal Incentives for Wind Power Deployment | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Incentives for Wind Power Deployment Federal Incentives for Wind Power Deployment Document that lists some of the major federal incentives for wind power deployment. ...

  15. FSM 2700, Chapter 2770 Special Uses Management: Federal Power...

    Open Energy Info (EERE)

    2770 Special Uses Management: Federal Power Act ProjectsLegal Abstract Manual setting forth the process for issuing special use authorizations for Federal Power Act projects....

  16. File:Federal Hydropower - Southwestern Power Administration.pdf...

    Open Energy Info (EERE)

    Federal Hydropower - Southwestern Power Administration.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Southwestern Power...

  17. PP-03 Federal Power Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission facilities at te U.S-Mexico border. PDF icon PP-03 Federal Power ...

  18. Procuring Fuel Cells for Stationary Power: A Guide for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers This ...

  19. Federal Government Awards Multi-Agency Solar Power Purchase in...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada December 17, ...

  20. Federal Incentives for Water Power | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Incentives for Water Power Federal Incentives for Water Power This factsheet lists some of the major federal incentives for water power technologies available as of April 2014. Federal Incentives for Water Power (3.62 MB) More Documents & Publications Federal Incentives for Wind Power Deployment Recovery Act Incentives for Wind Energy Equipment Manufacturing Qualified Energy Conservation Bond (QECB) Update: New Guidance from the U.S. Department of Treasury and the Internal Revenue

  1. Federal Incentives for Wind Power Deployment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Incentives for Wind Power Deployment Federal Incentives for Wind Power Deployment This factsheet lists some of the major federal incentives for wind power deployment as of September 2014. Federal Incentives for Wind Power Deployment.pdf (150.34 KB) More Documents & Publications Federal Incentives for Water Power Aggregating QECB Allocations and Using QECBs to Support the Private Sector: A Case Study on Massachusetts Qualified Energy Conservation Bond (QECB) Update: New Guidance from

  2. Power system

    DOE Patents [OSTI]

    Hickam, Christopher Dale

    2008-03-18

    A power system includes a prime mover, a transmission, and a fluid coupler having a selectively engageable lockup clutch. The fluid coupler may be drivingly connected between the prime mover and the transmission. Additionally, the power system may include a motor/generator drivingly connected to at least one of the prime mover and the transmission. The power-system may also include power-system controls configured to execute a control method. The control method may include selecting one of a plurality of modes of operation of the power system. Additionally, the control method may include controlling the operating state of the lockup clutch dependent upon the mode of operation selected. The control method may also include controlling the operating state of the motor/generator dependent upon the mode of operation selected.

  3. Federal On-Site Renewable Power Purchasing Issues

    Broader source: Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—covers on-site renewable power purchasing issues for federal facilities.

  4. Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities

    Broader source: Energy.gov [DOE]

     Proposed Coordination of Federal Authorizations for Electric Transmission Facilities – Interim Final Rule and Proposed Rule (DOE, 10 CR Part 900): The utility operating companies of the American...

  5. Federal Power Act section 202(c) - Mirant Corporation, August...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Power Act section 202(c) - Mirant Corporation, August 2005 Federal Power Act section 202(c) - Mirant Corporation, August 2005 On August 24, 2005 in response to a decision ...

  6. SOUTHEASTERN FEDERAL POWER ALLIANCE - October 9, 2013 | Department of

    Office of Environmental Management (EM)

    Energy October 9, 2013 SOUTHEASTERN FEDERAL POWER ALLIANCE - October 9, 2013 Southeastern Federal Power Alliance meeting was held on October 9, 2013 at the Municipal Electric Authority of Georgia (MEAG) located at 1470 Riveredge Parkway NW, Atlanta, Georgia. Documents Available for Download Southeastern Federal Power Alliance Meeting Agenda (18.16 KB) Bonham - Introduction to MEAG Power (39.01 KB) Coffman - APPA and Federal Hydro (36.18 KB) Coffman Handout - WRDA Letter to Boxer and Vitter -

  7. File:Federal Hydropower - Western Area Power Administration.pdf...

    Open Energy Info (EERE)

    Hydropower - Western Area Power Administration.pdf Jump to: navigation, search File File history File usage Metadata File:Federal Hydropower - Western Area Power Administration.pdf...

  8. Federal On-Site Renewable Power Purchase Agreements | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Federal On-Site Renewable Power Purchase Agreements On-site renewable power ... to fund renewable energy projects with minimal ... Distributed Generation Projects: Webinar ...

  9. SOUTHEASTERN FEDERAL POWER ALLIANCE Martin Luther King, Jr. Federal...

    Broader source: Energy.gov (indexed) [DOE]

    Martin Luther King, Jr. Federal Building 77 Forsyth Street SW, Atlanta, GA 30303 November 6, 2014 November 5, 2014: Meet at the Glenn Hotel lobby at 6:00 p.m. to walk to...

  10. SOUTHEASTERN FEDERAL POWER ALLIANCE - March 11, 2014 | Department of Energy

    Office of Environmental Management (EM)

    March 11, 2014 SOUTHEASTERN FEDERAL POWER ALLIANCE - March 11, 2014 SOUTHEASTERN FEDERAL POWER ALLIANCE - March 11, 2014 Southeastern Federal Power Alliance meeting was held on March 11, 2014 at the US Army Corps of Engineers Allatoona Project located at 1138 GA Highway 20 Spur, Cartesville, Georgia. Documents Available for Download Alliance Meeting Agenda (15.23 KB) SEPA Replacement Power Purchases (38.13 KB) ACT & ACF Water Control Manual Status (650.31 KB) Major Maintenance Update -

  11. Development of an Implementation Plan Related to Biological Opinion on Operation of the Federal Columbia River Power System ; Step 1: Review and Critique of Implementation Plans.

    SciTech Connect (OSTI)

    Neitzel, Duane A.; Bunn, Amoret

    2000-12-01

    The Draft Biological Opinion on Operation of the Federal Columbia River Power System calls for the development of 1- and 5-year implementation plans. These plans will provide the roadmap for planning and subsequent implementation of actions intended to meet specific performance standards (i.e., biological objectives) in a timely manner. To develop implementation plans the key tasks and sequences of steps must be determined. Those responsible for specific tasks must be identified and they must understand what they need to do. There must be assurances that the resources (human, physical, and fiscal) to complete the tasks are available. Motivation and incentive systems should be set up. Systems to coordinate efforts and guide activity must be devised and installed. An information management system must be designed to manage and analyze data and ensure that appropriate data are collected. This will aid managers in assessing whether individual activities or actions are tracking with stated goals and objectives. Training programs to improve managerial and worker capability in making and implementing plans should be designed. Managerial leadership to guide the efforts of all individuals in achieving the goals of the anadromous and resident fish recovery must be developed. It is the entire process of managing fish recovery in relationship to the Biological Opinion that will guide, coordinate, motivate, and control work and determine the effectiveness and efficiency of plan implementation.

  12. Green Power Purchasing Goal for Federal Government

    Office of Energy Efficiency and Renewable Energy (EERE)

    The federal Energy Policy Act of 2005 (EPAct 2005) extended and expanded several previous goals and standards to reduce energy use in existing and new federal buildings. Section 203 of EPAct 2005...

  13. Procuring Fuel Cells for Stationary Power: A Guide for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Decision Makers Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers Download presentation slides from the May 8, 2012, Fuel Cell Technologies Program ...

  14. Federal Power Act | Open Energy Information

    Open Energy Info (EERE)

    Regulatory commission) as the licensing authority certain interstate transmission and wholesale power sales and most hydroelectric power. Published NA Year Signed or Took Effect...

  15. Energy Department and Federal Efforts to Support Utility Power Restoration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efforts | Department of Energy Federal Efforts to Support Utility Power Restoration Efforts Energy Department and Federal Efforts to Support Utility Power Restoration Efforts October 31, 2012 - 5:19pm Addthis 58,000 workers are currently repairing power lines across the Mid-Atlantic in the aftermath of Hurricane Sandy. | Photo courtesy of the Energy Department 58,000 workers are currently repairing power lines across the Mid-Atlantic in the aftermath of Hurricane Sandy. | Photo courtesy of

  16. SOUTHEASTERN FEDERAL POWER ALLIANCE - September 29, 2015 | Department of

    Energy Savers [EERE]

    Energy September 29, 2015 SOUTHEASTERN FEDERAL POWER ALLIANCE - September 29, 2015 Southeastern Federal Power Alliance meeting was held on September 29, 2015 at the Oglethorpe Power Corporation, 2100 East Exchange Place, Tucker, Georgia. Documents Available for Download Alliance Team Meeting Agenda (359.26 KB) Overview of the Oglethorpe Power Corporation (809.21 KB) ACF Water Control Manual Update (713.33 KB) Operations Under Updated ACT Water Control Manual (2.14 MB) Allatoona Powerhouse

  17. Federal Incentives for Wind Power (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-05-01

    This fact sheet describes the federal incentives available as of April 2013 that encourage increased development and deployment of wind energy technologies, including research grants, tax incentives, and loan programs.

  18. Secretary Bodman Announces Federal Risk Insurance for Nuclear Power Plants

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Touts Robust Economy | Department of Energy Federal Risk Insurance for Nuclear Power Plants & Touts Robust Economy Secretary Bodman Announces Federal Risk Insurance for Nuclear Power Plants & Touts Robust Economy August 4, 2006 - 8:42am Addthis ATLANTA, GA - After touring Georgia Power and speaking to its employees, U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced completion of the final rule that establishes the process for utility companies building

  19. Federal financial assistance for hydroelectric power

    SciTech Connect (OSTI)

    Not Available

    1980-09-01

    The Rural Energy Initiative seeks to maximize the effectiveness of Federal programs in developing certain energy resources, including small-scale hydropower. The REI target is to arrange financing for 100 hydro sites by 1981, with about 300 MWe of additional capacity. The REI financial assistance programs for small hydropower development in the US DOE; Economic Development Administration; REA; HUD; Farmers Home Administration; DOI; DOL's CETA programs; and the Community Services Administration are described. (MCW)

  20. ETrans Federal Permitting Transmission Tracking System | Open...

    Open Energy Info (EERE)

    More recently, the Rapid Response Team for Transmission (RRTT) was created, which extends activity outside of federal lands. This website hosts a tracking system and search feature...

  1. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    SciTech Connect (OSTI)

    Colotelo, Alison HA; Harnish, Ryan A.; Jones, Bryan W.; Hanson, Amanda C.; Trott, Donna M.; Greiner, Michael J.; McMichael, Geoffrey A.; Ham, Kenneth D.; Deng, Zhiqun; Brown, Richard S.; Weiland, Mark A.; Li, X.; Fu, Tao

    2014-03-28

    Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile

  2. Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2

    SciTech Connect (OSTI)

    Colotelo, Alison H.A.; Harnish, Ryan A.; Jones, Bryan W.; Hanson, Amanda C.; Trott, Donna M.; Greiner, Michael J.; Mcmichael, Geoffrey A.; Ham, Kenneth D.; Deng, Zhiqun; Brown, Richard S.; Weiland, Mark A.; Li, Xinya; Fu, Tao

    2014-12-15

    Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile

  3. DOE's Use of Federal Power Act Emergency Authority | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    On December 14, 2000, a Federal Power Act section 202(c) emergency order was issued in response to the California energy crisis. On August 16, 2002, due to concerns regarding the ...

  4. Federal Power Act section 202(c) - California, December 2000...

    Broader source: Energy.gov (indexed) [DOE]

    December 14, 2000, a Federal Power Act section 202(c) emergency order was issued in response to the California energy crisis. The order was directed to the California Independent ...

  5. Terra-Gen Powers Coso Geothermal Facility Obtains Critical Federal...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Terra-Gen Powers Coso Geothermal Facility Obtains Critical Federal Permit to Increase Its...

  6. Combined Heat & Power Technology Overview and Federal Sector Deployment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation covers the Combined Heat & Power Technology Overview and Federal Sector Deployment from Oakridge National Laboratory. The presentation is from the FUPWG Spring Meeting, held on May 22, 2013 in San Francisco, California.

  7. FERC Presendation: Demand Response as Power System Resources...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FERC Presendation: Demand Response as Power System Resources, October 29, 2010 FERC Presendation: Demand Response as Power System Resources, October 29, 2010 Federal Energy ...

  8. Request for Information on a National Power Transformer Reserve: Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Register Notice Volume 80, No. 131 - July 9, 2015 | Department of Energy a National Power Transformer Reserve: Federal Register Notice Volume 80, No. 131 - July 9, 2015 Request for Information on a National Power Transformer Reserve: Federal Register Notice Volume 80, No. 131 - July 9, 2015 The Department of Energy (DOE), Office of Electricity Delivery and Energy Reliability (OE), is seeking comments and information from interested parties to inform its policy development related to the

  9. Power management system

    DOE Patents [OSTI]

    Algrain, Marcelo C.; Johnson, Kris W.; Akasam, Sivaprasad; Hoff, Brian D.

    2007-10-02

    A method of managing power resources for an electrical system of a vehicle may include identifying enabled power sources from among a plurality of power sources in electrical communication with the electrical system and calculating a threshold power value for the enabled power sources. A total power load placed on the electrical system by one or more power consumers may be measured. If the total power load exceeds the threshold power value, then a determination may be made as to whether one or more additional power sources is available from among the plurality of power sources. At least one of the one or more additional power sources may be enabled, if available.

  10. Power System Dispatcher (Trainer)

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Power System Operations Transmission Switching (J4100) 5555...

  11. Supervisory Power System Dispatcher

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Power System Operations, J4800 Transmission Scheduling &...

  12. H.R. 599: A Bill to provide for the reconstitution of outstanding repayment obligations of the Administrator of the Bonneville Power Administration for the appropriated capital investments in the Federal Columbia River Power System. Introduced in the House of Representatives, One Hundred Fourth Congress, First session

    SciTech Connect (OSTI)

    1995-12-31

    This bill proposes to give the administrator of the Bonneville Power Administration the rights to refinance certain capital investments in the Federal Columbia River Power System. The act spells out how to distinguish old and new capital investments, how new principal amounts for old investments are calculated, interest rates and repayment dates. It also deals with interest rates for new capital investments during and after construction, appropriations for the Colville Reservation Grand Coulee Dam Settlement Act, and suggested contract provisions regarding future contracts.

  13. Green Building Certification Systems Requirement for New Federal Buildings

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Major Renovations of Federal Buildings Final Rule | Department of Energy Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings Final Rule Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings Final Rule Document details the Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings' Final Rule for 10 CFR

  14. COAL & POWER SYSTEMS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... stitutions * InternationalCoal Technology Export C&PS ... * Systems Integration * Plant Designs Central Power ... Boiler System - Indirect Fired Cycles - Pressurized ...

  15. Federal On-Site Renewable Power Purchase Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements The Federal Energy Management Program (FEMP) provides project assistance to federal agencies interested in power purchase agreements (PPAs) for on-site renewable energy projects. A PPA is a financing option under FEMP's Renewable Energy Procurement (REP) Program. FEMP assists agencies through the PPA evaluation and implementation process.

  16. Federal On-Site Renewable Power Purchase Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Financing » Renewable Energy Procurement » Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements The Federal Energy Management Program (FEMP) provides project assistance to federal agencies interested in power purchase agreements (PPAs) for on-site renewable energy projects. A PPA is a financing option under FEMP's Renewable Energy Procurement (REP) Program. FEMP assists agencies

  17. Power System Dispatcher

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Sierra Nevada Region Power Systems Operation N4000 114 Parkshore Drive Folsom, CA...

  18. Green Building Certification Systems Requirement for New Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings Final Rule Fossil Fuel-Generated Energy Consumption Reduction ...

  19. Green Building Certification Systems Requirement for New Federal...

    Office of Environmental Management (EM)

    Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings OIRA Comparison Document Fossil Fuel-Generated Energy ...

  20. Power Control System

    Energy Science and Technology Software Center (OSTI)

    1995-02-24

    Power Control System (PCS) is used as a real time control software package for Supervisory Control and Data Acquistion (SCADA) in an electric utility control center environment.

  1. Title 48 CFR 1 Federal Acquisition Regulations System | Open...

    Open Energy Info (EERE)

    8 CFR 1 Federal Acquisition Regulations System Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 48 CFR...

  2. AC power systems handbook

    SciTech Connect (OSTI)

    Whitaker, J.

    1991-01-01

    Transient disturbances are what headaches are made of. Whatever you call them-spikes, surges, are power bumps-they can take your equipment down and leave you with a complicated and expensive repair job. Protection against transient disturbances is a science that demands attention to detail. This book explains how the power distribution system works, what can go wrong with it, and how to protect a facility against abnormalities. system grounding and shielding are covered in detail. Each major method of transient protection is analyzed and its relative merits discussed. The book provides a complete look at the critical elements of the ac power system. Provides a complete look at the ac power system from generation to consumption. Discusses the mechanisms that produce transient disturbances and how to protect against them. Presents diagrams to facilitate system design. Covers new areas, such as the extent of the transient disturbance problem, transient protection options, and stand-by power systems.

  3. Webinar: Procuring Fuel Cells for Stationary Power: A Guide for Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Decision Makers | Department of Energy Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers Webinar: Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers Download presentation slides from the May 8, 2012, Fuel Cell Technologies Program webinar, "Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers." Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers Webinar

  4. Audit of Funding for Advanced Radioisotope Power Systems, IG...

    Broader source: Energy.gov (indexed) [DOE]

    and Space Administration (NASA), the Department of Defense, and other Federal agencies. ... received proper reimbursement from NASA for the radioisotope power systems produced. ...

  5. SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION...

    Broader source: Energy.gov (indexed) [DOE]

    act as the lead agency for coordinating all applicable Federal authorizations and related environmental reviews required under Federal law in order to site an electric transmission...

  6. Sample Documents for Federal On-Site Renewable Power Purchase Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Renewable Energy Procurement » Sample Documents for Federal On-Site Renewable Power Purchase Agreements Sample Documents for Federal On-Site Renewable Power Purchase Agreements To help streamline the federal on-site renewable power purchase agreement (PPA) process, the Federal Energy Management Program works with agencies and partners to assemble sample documents from completed PPA projects. See these sample documents for examples of requests for proposals (RFPs), land

  7. Sample Documents for Federal On-Site Renewable Power Purchase Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Sample Documents for Federal On-Site Renewable Power Purchase Agreements Sample Documents for Federal On-Site Renewable Power Purchase Agreements To help streamline the federal on-site renewable power purchase agreement (PPA) process, the Federal Energy Management Program works with agencies and partners to assemble sample documents from completed PPA projects. See these sample documents for examples of requests for proposals (RFPs), land use agreements, and more.

  8. COAL & POWER SYSTEMS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    COAL & POWER SYSTEMS STRATEGIC & MULTI-YEAR PROGRAM PLANS U.S. DEPARTMENT OF ENERGY * OFFICE OF FOSSIL ENERGY GREENER, SOONER... THROUGH TECHNOLOGY INTRODUCTION .......... i-1 STRATEGIC PLAN ........ 1-1 PROGRAM PLANS Vision 21 .......................... 2-1 Central Power Systems ...... 3-1 Distributed Generation ..... 4-1 Fuels ................................ 5-1 Carbon Sequestration ....... 6-1 Advanced Research ........... 7-1 TABLE OF CONTENTS STRATEGIC & MULTI-YEAR PROGRAM

  9. NSTX Electrical Power Systems

    SciTech Connect (OSTI)

    A. Ilic; E. Baker; R. Hatcher; S. Ramakrishnan; et al

    1999-12-16

    The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The design of the NSTX electrical power system was tailored to suit the available infrastructure and electrical equipment on site. Components were analyzed to verify their suitability for use in NSTX. The total number of circuits and the location of the NSTX device drove the major changes in the Power system hardware. The NSTX has eleven (11) circuits to be fed as compared to the basic three power loops for TFTR. This required changes in cabling to insure that each cable tray system has the positive and negative leg of cables in the same tray. Also additional power cabling had to be installed to the new location. The hardware had to b e modified to address the need for eleven power loops. Power converters had to be reconnected and controlled in anti-parallel mode for the Ohmic heating and two of the Poloidal Field circuits. The circuit for the Coaxial Helicity Injection (CHI) System had to be carefully developed to meet this special application. Additional Protection devices were designed and installed for the magnet coils and the CHI. The thrust was to making the changes in the most cost-effective manner without compromising technical requirements. This paper describes the changes and addition to the Electrical Power System components for the NSTX magnet systems.

  10. OFFICE OF INSPECTOR GENERAL U.S. Department of Energy Southwestern Federal Power

    Energy Savers [EERE]

    Energy OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART Download Printable Version Mission & Functions Statement for the Office of Environmental Management

    OFFICE OF INSPECTOR GENERAL U.S. Department of Energy Southwestern Federal Power System's Fiscal Year 2015 Financial Statement Audit AUDIT REPORT OAI-FS-16-10 August 2016 Department of Energy Washington,

  11. Power Systems Development Facility

    SciTech Connect (OSTI)

    Southern Company Services

    2009-01-31

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF), located in Wilsonville, Alabama, has routinely demonstrated gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a Transport Gasifier, a hot gas particulate control device, advanced syngas cleanup systems, and high-pressure solids handling systems. This final report summarizes the results of the technology development work conducted at the PSDF through January 31, 2009. Twenty-one major gasification test campaigns were completed, for a total of more than 11,000 hours of gasification operation. This operational experience has led to significant advancements in gasification technologies.

  12. Environmental enforcement of federal agencies: A struggle for power under the New Federalism. Master's thesis

    SciTech Connect (OSTI)

    Surver, R.E.

    1990-01-01

    The challenge to Federalism presented by the new wave of environmental statutes is, while not unique in our history, a significant strain on state and federal relations. Behind this tension is the question of who should enforce these laws, especially when the violator is a Federal agency. Traditionally Federal agencies have been free to perform their diverse missions without restraint either from other Federal agencies or the states. This freedom has led to abuse in the arena of environmental compliance. Recent congressional hearings concerning amendments to the Resource Conservation and Recovery Act saw a congressional feeding frenzy over what was termed the abominable mess of federal facility environmental compliance. The obvious anger and frustration directed toward federal agencies, including the Environmental Protection Agency (EPA), by representatives of the states is a clear indicator of the extent of the problem and also a catalyst for an ill-conceived and dangerous legislative fix.

  13. Proton driver power supply system

    SciTech Connect (OSTI)

    C. Jach and D. Wolff

    2002-06-03

    This paper describes magnet power supply system for a proposed Proton Driver at Fermilab. The magnet power supply system consists of resonant dipole/quadrupole power supply system, quadrupole tracking, dipole correction (horizontal and vertical) and sextupole power supply systems. This paper also describes preliminary design of the power distribution system supplying 13.8 kV power to all proton Driver electrical systems.

  14. Webinar: Procuring Fuel Cells for Stationary Power: A Guide for Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facility Decision Makers | Department of Energy Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers Webinar: Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers Below is the text version of the webinar titled "Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers," originally presented on May 8, 2012. In addition to this text version of the audio, you can access the

  15. Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers

    Broader source: Energy.gov [DOE]

    Presentation slides from the May 8, 2012, Fuel Cell Technologies Program webinar, Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers.

  16. Power line detection system

    DOE Patents [OSTI]

    Latorre, Victor R.; Watwood, Donald B.

    1994-01-01

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.

  17. Power line detection system

    DOE Patents [OSTI]

    Latorre, V.R.; Watwood, D.B.

    1994-09-27

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

  18. Combined Heat and Power: A Federal Manager's Resource Guide,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This 2000 report identifies the short-, medium-, and long-term potential of internal combustion engines, combustion turbines, fuel cells, and micro-turbines for Federal facilities. ...

  19. SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    reviews required under Federal law in order to site an electric transmission facility. ... Authorizations for Electric Transmission Facilities Interim Final Rule and Proposed Rule

  20. Western Area Power Administration. Combined power system financial statements

    SciTech Connect (OSTI)

    1998-02-26

    This report presents the results of the independent certified public accountants` audit of the Western Area Power Administration`s combined power system statements of assets, Federal investment and liabilities, and the related combined statements of revenues, expenses and accumulated net revenues, and cash flows. The auditors` report on Westerns internal control structure disclosed three new reportable conditions concerning the lack of: (1) a reconciliation of stores inventory from subsidiary ledgers to summary financial information, (2) communication of interest during construction and related adjustments to interest on Federal investment, and (3) a system to prevent and detect power billing errors. None of the conditions were considered to be material weaknesses. Western provided concurrence and corrective action plans. The auditors` report on Western`s compliance with laws and regulations also disclosed two new instances of noncompliance. Western failed to calculate nonreimbursable expenses in accordance with the Grand Canyon Protection Act and had an unexplained difference in gross Federal investment balances used to calculate interest on Federal investment. Western provided concurrence and corrective action plans for the instances.

  1. Wireless power transfer system

    DOE Patents [OSTI]

    Wu, Hunter; Sealy, Kylee; Gilchrist, Aaron

    2016-02-23

    A system includes a first stage of an inductive power transfer system with an LCL load resonant converter with a switching section, an LCL tuning circuit, and a primary receiver pad. The IPT system includes a second stage with a secondary receiver pad, a secondary resonant circuit, a secondary rectification circuit, and a secondary decoupling converter. The secondary receiver pad connects to the secondary resonant circuit. The secondary resonant circuit connects to the secondary rectification circuit. The secondary rectification circuit connects to the secondary decoupling converter. The second stage connects to a load. The load includes an energy storage element. The second stage and load are located on a vehicle and the first stage is located at a fixed location. The primary receiver pad wirelessly transfers power to the secondary receiver pad across a gap when the vehicle positions the secondary receiver pad with respect to the primary receiver pad.

  2. Factsheet that lists the major federal incentives for water power...

    Broader source: Energy.gov (indexed) [DOE]

    The U.S. Department of Energy's (DOE's) Water Power Program works to accelerate the deployment of water power technologies such as hydro- power, wave, tidal, and current devices. ...

  3. High power connection system

    DOE Patents [OSTI]

    Schaefer, Christopher E.; Beer, Robert C.; McCall, Mark D.

    2000-01-01

    A high power connection system adapted for automotive environments which provides environmental and EMI shielding includes a female connector, a male connector, and a panel mount. The female connector includes a female connector base and a snap fitted female connector cover. The male connector includes a male connector base and a snap fitted male connector cover. The female connector base has at least one female power terminal cavity for seatably receiving a respective female power terminal. The male connector base has at least one male power terminal cavity for seatably receiving a respective male power terminal. The female connector is covered by a cover seal and a conductive shroud. A pair of lock arms protrude outward from the front end of the male connector base, pass through the panel mount and interface with a lever of a lever rotatably connected to the shroud to thereby mechanically assist mating of the male and female connectors. Safety terminals in the male and female connectors provide a last-to-connect-first-to-break connection with an HVIL circuit.

  4. ADVANCED TURBINE SYSTEM FEDERAL ASSISTANCE PROGRAM

    SciTech Connect (OSTI)

    Frank Macri

    2003-10-01

    Rolls-Royce Corporation has completed a cooperative agreement under Department of Energy (DOE) contract DE-FC21-96MC33066 in support of the Advanced Turbine Systems (ATS) program to stimulate industrial power generation markets. This DOE contract was performed during the period of October 1995 to December 2002. This final technical report, which is a program deliverable, describes all associated results obtained during Phases 3A and 3B of the contract. Rolls-Royce Corporation (formerly Allison Engine Company) initially focused on the design and development of a 10-megawatt (MW) high-efficiency industrial gas turbine engine/package concept (termed the 701-K) to meet the specific goals of the ATS program, which included single digit NOx emissions, increased plant efficiency, fuel flexibility, and reduced cost of power (i.e., $/kW). While a detailed design effort and associated component development were successfully accomplished for the 701-K engine, capable of achieving the stated ATS program goals, in 1999 Rolls-Royce changed its focus to developing advanced component technologies for product insertion that would modernize the current fleet of 501-K and 601-K industrial gas turbines. This effort would also help to establish commercial venues for suppliers and designers and assist in involving future advanced technologies in the field of gas turbine engine development. This strategy change was partly driven by the market requirements that suggested a low demand for a 10-MW aeroderivative industrial gas turbine, a change in corporate strategy for aeroderivative gas turbine engine development initiatives, and a consensus that a better return on investment (ROI) could be achieved under the ATS contract by focusing on product improvements and technology insertion for the existing Rolls-Royce small engine industrial gas turbine fleet.

  5. Procuring Fuel Cells for Stationary Power: A Guide for Federal Decision Makers

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers Federal Facilities Guide to Fuel Cells May 8, 2012 - Outline * Distributed Generation and Fuel Cell Power Overview (Pete Devlin 1 ) * How Does a Fuel Cell Work (Jacob Spendelow 2 ) * Guide Summary - How FC CHP can help Federal Facilities (Pete Devlin 1 ) - Third Party Financing (Greg Moreland 3 ) - Project Screening (Joe McGervey 3 ) - Detailed Planning (Joe McGervey 3 ) - Model (Michael Penev 4 ) - Project

  6. space exploration radioisotope power systems

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    space exploration radioisotope power systems - Sandia Energy Energy Search Icon Sandia ... SunShot Grand Challenge: Regional Test Centers space exploration radioisotope power ...

  7. Power System Dispatcher (Technical Writer)

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Power System Operations, J4900 Operations Reliability and...

  8. Power control system and method

    DOE Patents [OSTI]

    Steigerwald, Robert Louis; Anderson, Todd Alan

    2006-11-07

    A power system includes an energy harvesting device, a battery coupled to the energy harvesting device, and a circuit coupled to the energy harvesting device and the battery. The circuit is adapted to deliver power to a load by providing power generated by the energy harvesting device to the load without delivering excess power to the battery and to supplement the power generated by the energy harvesting device with power from the battery if the power generated by the energy harvesting device is insufficient to fully power the load. A method of operating the power system is also provided.

  9. Power control system and method

    DOE Patents [OSTI]

    Steigerwald, Robert Louis [Burnt Hills, NY; Anderson, Todd Alan [Niskayuna, NY

    2008-02-19

    A power system includes an energy harvesting device, a battery coupled to the energy harvesting device, and a circuit coupled to the energy harvesting device and the battery. The circuit is adapted to deliver power to a load by providing power generated by the energy harvesting device to the load without delivering excess power to the battery and to supplement the power generated by the energy harvesting device with power from the battery if the power generated by the energy harvesting device is insufficient to fully power the load. A method of operating the power system is also provided.

  10. Power Systems Development Facility

    SciTech Connect (OSTI)

    2003-07-01

    This report discusses Test Campaign TC12 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (SW) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or a gasifier using a particulate control device (PCD). While operating as a gasifier, either air or oxygen can be used as the oxidant. Test run TC12 began on May 16, 2003, with the startup of the main air compressor and the lighting of the gasifier start-up burner. The Transport Gasifier operated until May 24, 2003, when a scheduled outage occurred to allow maintenance crews to install the fuel cell test unit and modify the gas clean-up system. On June 18, 2003, the test run resumed when operations relit the start-up burner, and testing continued until the scheduled end of the run on July 14, 2003. TC12 had a total of 733 hours using Powder River Basin (PRB) subbituminous coal. Over the course of the entire test run, gasifier temperatures varied between 1,675 and 1,850 F at pressures from 130 to 210 psig.

  11. Federal Power Act section 202(c) - Cross-Sound Cable Company, August 2003 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 3 Federal Power Act section 202(c) - Cross-Sound Cable Company, August 2003 On August 14, 2003, in response to the blackout on that day in the Northeast and Upper Midwest areas of the United States, as well as portion of Canada, the New York Independent System Operator and ISO New England were directed to require Cross-Sound Cable Company to operate the Cross-Sound Cable and related facilities. The Expiration date on that order was September 1, 2003, but on August 28,

  12. Solar power system

    SciTech Connect (OSTI)

    Mcgrew, S.P.

    1980-05-27

    A system for generating electrical power from sunlight, comprises a focussing diffraction grating or other focussing, spectrally dispersive means and a photocell array. The diffraction grating focuses sunlight into a spectrally dispersed band. The photocell array is composed of cells with different spectral sensitivities, located in positions in the dispersed band corresponding to the cell spectral sensitivities so that the net conversion efficiency of sunlight to electricity exceeds the conversion efficiency attainable with nondispersive collectors and single material photocells. Alternate embodiments of the invention provide sun tracking means, reflective or transmissive diffraction gratings, flat or curved diffraction grating surfaces , on- or off-axis focus, and optical coatings on the photocell surfaces.

  13. HEADLINE: BPA RAISES RATES TO BOLSTER FEDERAL POWER AND TRANSMISSION...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    high-voltage transmission lines that serve Northwest public utilities." For Bonneville's utility power customers, the wholesale rate increase will be an average of 9 percent...

  14. Flex power perspectives of indirect power system control through...

    Open Energy Info (EERE)

    Flex power perspectives of indirect power system control through dynamic power price (Smart Grid Project) Jump to: navigation, search Project Name Flex power perspectives of...

  15. Federal Government Awards Multi-Agency Solar Power Purchase in California,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada | Department of Energy Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada Federal Government Awards Multi-Agency Solar Power Purchase in California, Nevada December 17, 2015 - 10:30am Addthis The U.S. General Services Administration (GSA), in partnership with the U.S. Department of Energy, U.S. Environmental Protection Agency, and U.S. Forest Service, awarded a contract for the federal government's first-ever joint solar power procurement in California

  16. Main Injector power distribution system

    SciTech Connect (OSTI)

    Cezary Jach and Daniel Wolff

    2002-06-03

    The paper describes a new power distribution system for Fermilab's Main Injector. The system provides 13.8 kV power to Main Injector accelerator (accelerator and conventional loads) and is capable of providing power to the rest of the laboratory (backfeed system). Design criteria, and features including simulation results are given.

  17. SOUTHEASTERN FEDERAL POWER ALLIANCE - April 2, 2015 | Department of Energy

    Office of Environmental Management (EM)

    SOURCE SELECTION INFORMATION - SEE FEDERAL ACQUISITION REGULATION (FAR) 2.101 AND 3.104 Department of Energy Washington, DC 20585 (enter date here, centered revised template April 26, 2013) The Honorable Harold Rogers The Honorable Barbara A. Mikulski Chairman, Committee on Appropriations Chairwoman, Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 The Honorable Rodney P. Frelinghuysen The Honorable Dianne Feinstein Chairman,

  18. Solar thermal power system

    SciTech Connect (OSTI)

    Bennett, Charles L.

    2010-06-15

    A solar thermal power generator includes an inclined elongated boiler tube positioned in the focus of a solar concentrator for generating steam from water. The boiler tube is connected at one end to receive water from a pressure vessel as well as connected at an opposite end to return steam back to the vessel in a fluidic circuit arrangement that stores energy in the form of heated water in the pressure vessel. An expander, condenser, and reservoir are also connected in series to respectively produce work using the steam passed either directly (above a water line in the vessel) or indirectly (below a water line in the vessel) through the pressure vessel, condense the expanded steam, and collect the condensed water. The reservoir also supplies the collected water back to the pressure vessel at the end of a diurnal cycle when the vessel is sufficiently depressurized, so that the system is reset to repeat the cycle the following day. The circuital arrangement of the boiler tube and the pressure vessel operates to dampen flow instabilities in the boiler tube, damp out the effects of solar transients, and provide thermal energy storage which enables time shifting of power generation to better align with the higher demand for energy during peak energy usage periods.

  19. SCR Catalyst and Hyperion Power Module garner Federal Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to Hyperion Power Generation Inc. in 2008. The HPM, developed by Otis Peterson, Turner Trapp, and Patrick McClure, uses the energy of low-enriched uranium fuel and meets all...

  20. Federal Power Act section 202(c)- Hurricane Ike, September 2008

    Broader source: Energy.gov [DOE]

    On September 14, 2008, in response to Hurricane Ike, a 202(c) emergency order was issued authorizing CenterPoint Energy to temporarily connect electricity lines to restore power to Entergy Gulf...

  1. Energy Department and Federal Efforts to Support Utility Power...

    Office of Environmental Management (EM)

    ... For example, the U.S. Army Corps of Engineers deployed water pumps to a flooded Con Edison power substation in New York to help clear out the water - a necessary step before the ...

  2. FEMP Offers Training on Federal On-Site Renewable Power Purchase Agreements

    Broader source: Energy.gov [DOE]

    This refreshed eTraining core course provides federal energy and facility managers and contracting officers with up-to-date knowledge and best practices for developing an on-site renewable power purchase agreement (PPA) on a federal site and includes current definitions, references, and guidance to help launch or accelerate a PPA project.

  3. TidGen Power System Commercialization Project

    SciTech Connect (OSTI)

    Sauer, Christopher R.; McEntee, Jarlath

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  4. Power Systems Engineering

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    systems; steam, water, fuel, and environmental monitoring systems; alternative energy systems; reliability, availability, and maintainability assessments; and associated...

  5. Switching power pulse system

    DOE Patents [OSTI]

    Aaland, K.

    1983-08-09

    A switching system for delivering pulses of power from a source to a load using a storage capacitor charged through a rectifier, and maintained charged to a reference voltage level by a transistor switch and voltage comparator. A thyristor is triggered to discharge the storage capacitor through a saturable reactor and fractional turn saturable transformer having a secondary to primary turn ratio N of n:l/n = n[sup 2]. The saturable reactor functions as a soaker'' while the thyristor reaches saturation, and then switches to a low impedance state. The saturable transformer functions as a switching transformer with high impedance while a load coupling capacitor charges, and then switches to a low impedance state to dump the charge of the storage capacitor into the load through the coupling capacitor. The transformer is comprised of a multilayer core having two secondary windings tightly wound and connected in parallel to add their output voltage and reduce output inductance, and a number of single turn windings connected in parallel at nodes for the primary winding, each single turn winding linking a different one of the layers of the multilayer core. The load may be comprised of a resistive beampipe for a linear particle accelerator and capacitance of a pulse forming network. To hold off discharge of the capacitance until it is fully charged, a saturable core is provided around the resistive beampipe to isolate the beampipe from the capacitance until it is fully charged. 5 figs.

  6. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  7. Wind to Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Power Systems Jump to: navigation, search Name: Wind to Power Systems Place: Madrid, Spain Zip: 28108 Sector: Wind energy Product: Wind to Power Systems designs, supplies and...

  8. About Federal On-Site Renewable Power Purchase Agreements | Department...

    Broader source: Energy.gov (indexed) [DOE]

    the National Renewable Energy Laboratory in Golden, Colorado. A PPA funded the photovoltaic system installed on the Research Support Facility at the National Renewable Energy ...

  9. Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings OIRA Comparison Document

    Broader source: Energy.gov [DOE]

    Document details the Green Building Certification Systems Requirement for New Federal Buildings and Major Renovations of Federal Buildings' OIRA Comparison Document for 10 CFR Parts 433, 435 and 436.

  10. Switching power pulse system

    DOE Patents [OSTI]

    Aaland, Kristian

    1983-01-01

    A switching system for delivering pulses of power from a source (10) to a load (20) using a storage capacitor (C3) charged through a rectifier (D1, D2), and maintained charged to a reference voltage level by a transistor switch (Q1) and voltage comparator (12). A thyristor (22) is triggered to discharge the storage capacitor through a saturable reactor (18) and fractional turn saturable transformer (16) having a secondary to primary turn ratio N of n:l/n=n.sup.2. The saturable reactor (18) functions as a "soaker" while the thyristor reaches saturation, and then switches to a low impedance state. The saturable transformer functions as a switching transformer with high impedance while a load coupling capacitor (C4) charges, and then switches to a low impedance state to dump the charge of the storage capacitor (C3) into the load through the coupling capacitor (C4). The transformer is comprised of a multilayer core (26) having two secondary windings (28, 30) tightly wound and connected in parallel to add their output voltage and reduce output inductance, and a number of single turn windings connected in parallel at nodes (32, 34) for the primary winding, each single turn winding linking a different one of the layers of the multilayer core. The load may be comprised of a resistive beampipe (40) for a linear particle accelerator and capacitance of a pulse forming network (42). To hold off discharge of the capacitance until it is fully charged, a saturable core (44) is provided around the resistive beampipe (40) to isolate the beampipe from the capacitance (42) until it is fully charged.

  11. power-take-off system

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    power-take-off system - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Energy Defense Waste Management Programs Advanced

  12. Lights out on federal power: A plan to privatize the PMAs

    SciTech Connect (OSTI)

    Block, M.K.; Shadegg, J.

    1997-11-01

    Privatizing the power marketing administrations makes sense. Unless these federal administrations are sold, taxpayers will continue to subsidize power to the rich, and the PMAs will distort and hinder competition in the electric energy market. Employ this plan today and it will be possible to achieve benefits for all stakeholders. If there were a book entitled Privatization in The United States, it would be very thin indeed. It would be so partly because America did not participate as extensively as most countries in this century`s destructive experiment where governments produced goods that would be more efficiently produced by the private sector. Unfortunately, the book also would be thin because Americans have been less aggressive and imaginative than countries from Great Britain to Bolivia in withdrawing their national government from activities better suited to the private sector. One obvious target for immediate privatization is the federal electric power resources. This article proposes a politically viable plan to expand privatization in America by selling three of the federal government`s power marketing administrations. The PMAs, as they are known to the cognoscenti, market power generated by federally owned dams. Currently, the federal government is the nation`s largest producer and transmitter of electricity. While the government`s involvement in the electricity industry was once justified, these reasons no longer exist.

  13. Wireless power transfer test system

    DOE Patents [OSTI]

    Gilchrist, Aaron; Wu, Hunter; Sealy, Kylee D.; Israelsen, Paul D.

    2015-09-22

    A testing system for wireless power transfer systems, including a stationary plate, a rotating plate, and a driver to rotate the rotating plate with respect to the stationary plate.

  14. Reactive Power Compensating System.

    DOE Patents [OSTI]

    Williams, Timothy J.; El-Sharkawi, Mohamed A.; Venkata, Subrahmanyam S.

    1985-01-04

    The circuit was designed for the specific application of wind-driven induction generators. It has great potential for application in any situation where a varying reactive power load is present, such as with induction motors or generators, or for transmission network compensation.

  15. Reactive power compensating system

    DOE Patents [OSTI]

    Williams, Timothy J.; El-Sharkawi, Mohamed A.; Venkata, Subrahmanyam S.

    1987-01-01

    The reactive power of an induction machine is compensated by providing fixed capacitors on each phase line for the minimum compensation required, sensing the current on one line at the time its voltage crosses zero to determine the actual compensation required for each phase, and selecting switched capacitors on each line to provide the balance of the compensation required.

  16. FERC Presendation: Demand Response as Power System Resources, October 29, 2010

    Broader source: Energy.gov [DOE]

    Federal Energy Regulatory Commission (FERC) presentation on demand response as power system resources before the Electicity Advisory Committee, October 29, 2010

  17. Promethean Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Power Systems Jump to: navigation, search Name: Promethean Power Systems Place: Cambridge, Massachusetts Zip: 2138 Product: US-based developer of a solar-powered...

  18. 2001 ''You Have the Power'' campaign [Federal Energy Management Program]. Final technical report

    SciTech Connect (OSTI)

    2002-01-01

    The Tasks of 2001 ''You Have the Power'' campaign by the Federal Energy Management Program (FEMP) are: Task 1--Interagency Planning Meetings; Task 2--Ear Day Event; Task 3--Earth Day and Energy Awareness Month Activities; Task 4--Regional Target; Task 5--Outreach Tools and Campaign Products; Task 6--Private Sector Participation; Task 7--''You Have the Power'' on the FEMP Web Site; and Task 8--Effective Communications.

  19. Application to export electric energy OE Docket No.EA-243-B Tenaska Power Svcs: Federal Register Notice Volume 76, No. 211- Nov. 1, 2011

    Broader source: Energy.gov [DOE]

    Application from Tenaska Power Svcs. Co to export electric energy to Canada. Federal Register Notice.

  20. Power Systems Engineer | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Knowledge of AC Power, power conversion, DC circuits, motors, power technology, and industrial control systems. * Uses independent judgment in applying standard engineering...

  1. Solar-powered cooling system

    DOE Patents [OSTI]

    Farmer, Joseph C

    2013-12-24

    A solar-powered adsorption-desorption refrigeration and air conditioning system uses nanostructural materials made of high specific surface area adsorption aerogel as the adsorptive media. Refrigerant molecules are adsorbed on the high surface area of the nanostructural material. A circulation system circulates refrigerant from the nanostructural material to a cooling unit.

  2. ADVANCED POWER SYSTEMS ASH BEHAVIOR IN POWER SYSTEMS

    SciTech Connect (OSTI)

    CHRISTOPHER J. ZYGARLICKE; DONALD P. MCCOLLOR; JOHN P. KAY; MICHAEL L. SWANSON

    1998-09-01

    The overall goal of this initiative is to develop fundamental knowledge of ash behavior in power systems for the purpose of increasing power production efficiency, reducing operation and maintenance costs, and reducing greenhouse gas emissions into the atmosphere. The specific objectives of this initiative focus primarily on ash behavior related to advanced power systems and include the following: ? Determine the current status of the fundamental ash interactions and deposition formation mechanisms as already reported through previous or ongoing projects at the EERC or in the literature. ? Determine sintering mechanisms for temperatures and particle compositions that are less well known and remain for the most part undetermined. ? Identify the relationship between the temperature of critical viscosity (Tcv ) as measured in a viscometer and the crystallization occurring in the melt. ? Perform a literature search on the use of heated-stage microscopy (HSM) for examining in situ ash-sintering phenomena and then validate the use of HSM in the determination of viscosity in spherical ash particles. ? Ascertain the formation and stability of specific mineral or amorphous phases in deposits typical of advanced power systems. ? Evaluate corrosion for alloys being used in supercritical combustion systems.

  3. InPower Systems | Open Energy Information

    Open Energy Info (EERE)

    Name: InPower Systems Place: Carbondale, Colorado Zip: 81623 Sector: Geothermal energy, Solar Product: InPower Systems designs, installs and maintains turn-key solar, solar...

  4. Husk Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Power Systems Jump to: navigation, search Name: Husk Power Systems Place: Patna, Bihar, India Zip: 800023 Sector: Biomass Product: India-based developer of mini biomass plants....

  5. Renewable Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Renewable Power Systems Place: Bedford, England, United Kingdom Zip: MK42 9TW Sector: Renewable Energy Product: Bedford, UK based developer of renewable power systems. References:...

  6. Sathian Sun Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Sathian Sun Power Systems Jump to: navigation, search Name: Sathian Sun Power Systems Place: Salem, Andhra Pradesh, India Sector: Solar Product: Manufacturer of solar street lights...

  7. Monolithic Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Power Systems Jump to: navigation, search Name: Monolithic Power Systems Place: San Jose, California Zip: 95120 Product: A California-based analog semiconductor company....

  8. Renewable Power Systems LLC | Open Energy Information

    Open Energy Info (EERE)

    Power Systems LLC Jump to: navigation, search Name: Renewable Power Systems, LLC Place: Averill Park, New York Zip: 12018 Sector: Solar Product: Albany, New York-based solar...

  9. Nuclear power reactor instrumentation systems handbook. Volume...

    Office of Scientific and Technical Information (OSTI)

    Nuclear power reactor instrumentation systems handbook. Volume 1 Citation Details In-Document Search Title: Nuclear power reactor instrumentation systems handbook. Volume 1 You ...

  10. Power System Operator | Department of Energy

    Office of Environmental Management (EM)

    is to market and deliver Federal hydroelectric power at the lowest possible cost to ... At Southeastern, you can make a direct impact by helping us deliver low-cost hydroelectric ...

  11. Tulsa District Projects Impacting Federal Power Programs and Project Management Division

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tulsa District Projects Impacting Federal Power Programs and Project Management Division Tulsa District 22 June 2016 BUILDING STRONG ® Interior Least Tern Operations and Habitat Management  Interior Least Tern (ILT) proposed for de-listing. Timeframe uncertain. Until delisted, all Endangered Species Act requirements still apply.  Revised Biological Opinion (BO) covering SWT, SWL, and SWPA to be provided by Fish and Wildlife Service (estimated June 2016). Need for revision primarily driven

  12. Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers OCTOBER 2011 Fuel Cell Technologies Program Oak Ridge National Laboratory 2 October 2011 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or

  13. Combined Heat and Power: A Federal Manager's Resource Guide, March 2000

    Office of Energy Efficiency and Renewable Energy (EERE)

    Report providing guidance to Federal Energy Managers regarding the potential of CHP technologies in Federal facilities.

  14. BPA Power Generation (pbl/main)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation Hydro Power Wind Power Monthly GSP BPA White Book Dry Year Tools Firstgov Power Generation Hydro Power Federal Columbia River Power System (FCRPS) Hydro Projects FCRPS...

  15. Uninterruptible power supply cogeneration system

    SciTech Connect (OSTI)

    Gottfried, C.F.

    1987-08-11

    A power system is described for providing an uninterruptible power supply comprising: a first generator means for supplying energy to a primary load; a second generator means connected to an electrical utility, the first and second generator means being connected by a common shaft, the first generator means being electrically isolated from the electrical utility; prime mover means connected to the common shaft, the prime mover means for supplying mechanical energy to the shaft; and controller means interposed electrically between the second generator means and the secondary external load, the controller means causing the second generator means to become disconnected from the secondary load upon interruptions in the secondary load.

  16. Catalog of DC Appliances and Power Systems

    SciTech Connect (OSTI)

    Garbesi, Karina; Vossos, Vagelis; Shen, Hongxia

    2010-10-13

    This document catalogs the characteristics of current and potential future DC products and power systems.

  17. Power system applications for PASC converter systems

    SciTech Connect (OSTI)

    Donnelly, M.K.; Johnson, R.M.

    1994-04-01

    This paper shows, using computer EMTP simulations, some preliminary results of applying pulse amplitude synthesis and control (PASC) technology to single-source level voltage converter system. The method can be applied to any single terminal pair source with appropriate modifications in power extraction interface and computer control program to match source and load impedance characteristics. The PASC realization as discussed here employs banks of transformers, one bank per phase, in which the primaries are connected in parallel through a switch matrix to the dc source. Two opposite polarity primaries per transformer are pulsed alternatively in time to produce an oscillatory sinusoidal output waveform. PASC conversion system capabilities to produce both leading and lagging power factor power output in single-phase and three-phase {Delta} or Y configurations are illustrated. EMTP simulations are used to demonstrate the converter capabilities. Also included are discussions regarding harmonics and potential control strategies to adapt the converter to an application or to minimize harmonics.

  18. Future Power Systems 21 - The Smart Customer | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Future Power Systems 21 - The Smart Customer Future Power Systems 21 - The Smart Customer Future Power Systems 21 - The Smart Customer: From Future Power Systems (FPS) articles 18...

  19. Jadoo Power Systems Inc | Open Energy Information

    Open Energy Info (EERE)

    Product: US-based fuel cell developer, Jadoo Power Systems Inc, produces high energy density power products for the law enforcement, military and electronic news gathering...

  20. New Horizons Mission Powered by Space Radioisotope Power Systems |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Horizons Mission Powered by Space Radioisotope Power Systems New Horizons Mission Powered by Space Radioisotope Power Systems January 30, 2008 - 6:47pm Addthis Artist's concept of the New Horizons spacecraft during its planned encounter with Pluto and its moon, Charon. The craft's miniature cameras, radio science experiment, ultraviolet and infrared spectrometers and space plasma experiments are run by the Department of Energy's Radioisotope Thermoelectric Generator

  1. Modeling Power Systems as Complex Adaptive Systems

    SciTech Connect (OSTI)

    Chassin, David P.; Malard, Joel M.; Posse, Christian; Gangopadhyaya, Asim; Lu, Ning; Katipamula, Srinivas; Mallow, J V.

    2004-12-30

    Physical analogs have shown considerable promise for understanding the behavior of complex adaptive systems, including macroeconomics, biological systems, social networks, and electric power markets. Many of today's most challenging technical and policy questions can be reduced to a distributed economic control problem. Indeed, economically based control of large-scale systems is founded on the conjecture that the price-based regulation (e.g., auctions, markets) results in an optimal allocation of resources and emergent optimal system control. This report explores the state-of-the-art physical analogs for understanding the behavior of some econophysical systems and deriving stable and robust control strategies for using them. We review and discuss applications of some analytic methods based on a thermodynamic metaphor, according to which the interplay between system entropy and conservation laws gives rise to intuitive and governing global properties of complex systems that cannot be otherwise understood. We apply these methods to the question of how power markets can be expected to behave under a variety of conditions.

  2. Federal Power Act section 202(c) - Cross-Sound Cable Company, August 2002 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 2 Federal Power Act section 202(c) - Cross-Sound Cable Company, August 2002 On August 16, 2002, due to concerns regarding the availability of electricity on Long Island in the State of New York, a 202(c) order was issued directing Cross-Sound Cable Company to operate the Cross-Sound Cable from Connecticut to Long Island and related facilities. The order expired on October 1, 2002, pursuant to its terms. 202(c) order 202-02-1 August 16, 2002 - CSC.pdf (92.92 KB) 202(c)

  3. Power system design | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    system design Subscribe to RSS - Power system design The design of the systems that would convert fusion energy into heat to create steam that would generate electricity. PPPL ...

  4. A Proposed Implementation of Tarjan's Algorithm for Scheduling the Solution Sequence of Systems of Federated Models

    SciTech Connect (OSTI)

    McNunn, Gabriel S; Bryden, Kenneth M

    2013-01-01

    Tarjan's algorithm schedules the solution of systems of equations by noting the coupling and grouping between the equations. Simulating complex systems, e.g., advanced power plants, aerodynamic systems, or the multi-scale design of components, requires the linkage of large groups of coupled models. Currently, this is handled manually in systems modeling packages. That is, the analyst explicitly defines both the method and solution sequence necessary to couple the models. In small systems of models and equations this works well. However, as additional detail is needed across systems and across scales, the number of models grows rapidly. This precludes the manual assembly of large systems of federated models, particularly in systems composed of high fidelity models. This paper examines extending Tarjan's algorithm from sets of equations to sets of models. The proposed implementation of the algorithm is demonstrated using a small one-dimensional system of federated models representing the heat transfer and thermal stress in a gas turbine blade with thermal barrier coating. Enabling the rapid assembly and substitution of different models permits the rapid turnaround needed to support the what-if kinds of questions that arise in engineering design.

  5. Uninterruptible power supply (UPS) systems

    SciTech Connect (OSTI)

    1997-04-01

    Use of this purchase specification is not mandatory. User should review the document and determine if it meets the user`s purpose. This document contains a fill-in-the-blanks guide specification for the procurement of uninterruptible power supply (UPS) systems greater than 10 kVA, organized as follows: Parts 1 through 7--technical requirements; Appendix A--technical requirements to be included in the proposal; Appendix B--UPS system data sheets to be completed by each bidder (Seller) and submitted with the proposal; Appendix C--general guidelines giving the specifier parameters for selecting a UPS system; it should be read before preparing an actual specification, and is not attached to the specification; Attachment 1--sketches prepared by the purchaser (Owner); Attachment 2--sample title page.

  6. System and method for advanced power management

    DOE Patents [OSTI]

    Atcitty, Stanley; Symons, Philip C.; Butler, Paul C.; Corey, Garth P.

    2009-07-28

    A power management system is provided that includes a power supply means comprising a plurality of power supply strings, a testing means operably connected to said plurality of power supply strings for evaluating performance characteristics of said plurality of power supply strings, and a control means for monitoring power requirements and comprising a switching means for controlling switching of said plurality of power supply strings to said testing means.

  7. Application to export electric energy OE Docket No. EA-348 FPL Energy Power Marketing Inc: Federal Register Notice Volume 74, No. 15- Jan. 26, 2009

    Broader source: Energy.gov [DOE]

    Application from FPL Energy Power Marketing Inc to export electric energy to Canada. Federal Register Notice Vol 74 No 15

  8. Application to export electric energy OE Docket No. EA-220-C NRG Power Marketing LLC: Federal Register Notice Volume 75, No. 234- Dec. 7, 2010

    Broader source: Energy.gov [DOE]

    Application from NRG Power Marketing LLC to export electric energy to Canada. Federal Register Vol 75 No 234

  9. Solar-powered cooling system

    DOE Patents [OSTI]

    Farmer, Joseph C.

    2015-07-28

    A solar-powered adsorption-desorption refrigeration and air conditioning system that uses nanostructural materials such as aerogels, zeolites, and sol gels as the adsorptive media. Refrigerant molecules are adsorbed on the high surface area of the nanostructural material while the material is at a relatively low temperature, perhaps at night. During daylight hours, when the nanostructural materials is heated by the sun, the refrigerant are thermally desorbed from the surface of the aerogel, thereby creating a pressurized gas phase in the vessel that contains the aerogel. This solar-driven pressurization forces the heated gaseous refrigerant through a condenser, followed by an expansion valve. In the condenser, heat is removed from the refrigerant, first by circulating air or water. Eventually, the cooled gaseous refrigerant expands isenthalpically through a throttle valve into an evaporator, in a fashion similar to that in more conventional vapor recompression systems.

  10. Tri Power Systems Inc | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Logo: Tri Power Systems Inc Name: Tri Power Systems Inc Address: P.O. Box 1450 Place: Idaho Springs, Colorado Zip: 80452 Region: Rockies Area Sector: Solar...

  11. MSE Power Systems Inc | Open Energy Information

    Open Energy Info (EERE)

    MSE Power Systems Inc Jump to: navigation, search Name: MSE Power Systems Inc Place: Albany, New York Zip: NY 12205 Sector: Services Product: Albany-based privately held company...

  12. Power Systems Integration Laboratory (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-10-01

    This fact sheet describes the purpose, lab specifications, applications scenarios, and information on how to partner with NREL's Power Systems Integration Laboratory at the Energy Systems Integration Facility. At NREL's Power Systems Integration Laboratory in the Energy Systems Integration Facility (ESIF), research focuses on developing and testing large-scale distributed energy systems for grid-connected, stand-alone, and microgrid applications. The laboratory can accommodate large power system components such as inverters for photovoltaic (PV) and wind systems, diesel and natural gas generators, battery packs, microgrid interconnection switchgear, and vehicles. Closely coupled with the research electrical distribution bus at the ESIF, the Power Systems Integration Laboratory will offer power testing capability of megawatt-scale DC and AC power systems, as well as advanced hardware-in-the-loop and model-in-the-loop simulation capabilities. Thermal heating and cooling loops and fuel also allow testing of combined heating/cooling and power systems (CHP).

  13. SITE ELECTRICAL POWER SYSTEM DESCRIPTION DOCUMENT

    SciTech Connect (OSTI)

    E.P. McCann

    1999-04-16

    The Site Electrical Power System receives and distributes utility power to all North Portal site users. The major North Portal users are the Protected Area including the subsurface facility and Balance of Plant areas. The system is remotely monitored and controlled from the Surface Operations Monitoring and Control System. The system monitors power quality and provides the capability to transfer between Off-Site Utility and standby power (including dedicated safeguards and security power). Standby power is only distributed to selected loads for personnel safety and essential operations. Security power is only distributed to essential security operations. The standby safeguards and security power is independent from all other site power. The system also provides surface lighting, grounding grid, and lightning protection for the North Portal. The system distributes power during construction, operation, caretaker, and closure phases of the repository. The system consists of substation equipment (disconnect switches, breakers, transformers and grounding equipment) and power distribution cabling from substation to the north portal switch gear building. Additionally, the system includes subsurface facility substation (located on surface), switch-gear, standby diesel generators, underground duct banks, power cables and conduits, switch-gear building and associated distribution equipment for power distribution. Each area substation distributes power to the electrical loads and includes the site grounding, site lighting and lightning protection equipment. The site electrical power system distributes power of sufficient quantity and quality to meet users demands. The Site Electrical Power System interfaces with the North Portal surface systems requiring electrical power. The system interfaces with the Subsurface Electrical Distribution System which will supply power to the underground facilities from the North Portal. Power required for the South Portal and development side

  14. EMERY BIOMASS GASIFICATION POWER SYSTEM

    SciTech Connect (OSTI)

    Benjamin Phillips; Scott Hassett; Harry Gatley

    2002-11-27

    Emery Recycling Corporation (now Emery Energy Company, LLC) evaluated the technical and economical feasibility of the Emery Biomass Gasification Power System (EBGPS). The gasifier technology is owned and being developed by Emery. The Emery Gasifier for this project was an oxygen-blown, pressurized, non-slagging gasification process that novelly integrates both fixed-bed and entrained-flow gasification processes into a single vessel. This unique internal geometry of the gasifier vessel will allow for tar and oil destruction within the gasifier. Additionally, the use of novel syngas cleaning processes using sorbents is proposed with the potential to displace traditional amine-based and other syngas cleaning processes. The work scope within this project included: one-dimensional gasifier modeling, overall plant process modeling (ASPEN), feedstock assessment, additional analyses on the proposed syngas cleaning process, plant cost estimating, and, market analysis to determine overall feasibility and applicability of the technology for further development and commercial deployment opportunities. Additionally, the project included the development of a detailed technology development roadmap necessary to commercialize the Emery Gasification technology. Process modeling was used to evaluate both combined cycle and solid oxide fuel cell power configurations. Ten (10) cases were evaluated in an ASPEN model wherein nine (9) cases were IGCC configurations with fuel-to-electricity efficiencies ranging from 38-42% and one (1) case was an IGFC solid oxide case where 53.5% overall plant efficiency was projected. The cost of electricity was determined to be very competitive at scales from 35-71 MWe. Market analysis of feedstock availability showed numerous market opportunities for commercial deployment of the technology with modular capabilities for various plant sizes based on feedstock availability and power demand.

  15. Power Electronic Thermal System Performance and Integration ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electronic Thermal System Performance and Integration Power Electronic Thermal System Performance and Integration 2009 DOE Hydrogen Program and Vehicle Technologies Program Annual ...

  16. Synergetic Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Sector: Buildings, Solar Product: Start-up planning to install parabolic concentrated solar collector systems on large flat-roofed buildings to power their HVAC systems, and...

  17. Independent Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Systems is an independent energy consultancy specialising in reducing client energy and environmental costs. References: Independent Power Systems1 This article is a stub. You...

  18. Electric Power Generation Systems | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electric Power Generation Systems Coal gasification-based power plants Coal combustion-based power plants Natural gas-fueled power plants Turbines Fuel cells Existing power plants...

  19. NREL: Water Power Research - Economic and Power System Modeling and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Analysis Economic and Power System Modeling and Analysis NREL's Economic Analysis and power system modeling integrates data from device deployment and programmatic research into deployment and scenario models to quantify the economic and societal benefits of developing cost-competitive marine and hydrokinetic systems. It also identifies policy mechanisms, market designs, and supply chain needs to support various deployment scenarios, provide information and training to potential members of

  20. Class Deviation from Federal Awardee Performance and Integrity Information Systems (FAPIIS) Requirement at Federal Acquisition Regulation (FAR) 9.4

    Broader source: Energy.gov [DOE]

    Attached is Civilian Agency Acquisition Letter 20 10-02. which recommends that civilian agencies authorize class deviations from FAR provisions 9.406-3(f)(1) and 9.407-3(e)(l), the specific portions of the Federal Awardee Performance and Integrity Information Systems (FAPIIS) rule requiring debarring and suspending officials to enter administrative agreements into the FAPSIIS data system. Accordingly, also attached is the Department of Energy's class deviation suspending compliance with this portion of the FAPIIS rule.

  1. AUDIT REPORT Southwestern Federal Power System's Fiscal Year...

    Broader source: Energy.gov (indexed) [DOE]

    ... and the related hydroelectric generating facilities ... includes items such as dams, spillways, generators, ... the remainder applied to the unpaid generation investment. ...

  2. AUDIT REPORT Southwestern Federal Power System's Fiscal Year...

    Office of Environmental Management (EM)

    ... and operates hydroelectric generating facilities ... includes items such as dams, spillways, generators, ... the remainder applied to the unpaid generation investment. ...

  3. Federal Columbia River Power System (FCRPS) FY 2011 THIRD QUARTER...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    potential financial results that could occur by the end of the year, mainly a result of water conditions and short-term market prices, both of which can affect net secondary...

  4. Power production from renewable resources in a gasification power system

    SciTech Connect (OSTI)

    Paisley, M.A.; Farris, G.; Bain, R.

    1996-12-31

    The US Department of Energy (DOE) has been a leader in the promotion and development of alternative fuel supplies based on renewable energy crops. One promising power generation technology is biomass gasification coupled with either a gas turbine in a combined cycle system or a fuel cell. The gasification of biomass can efficiently and economically produce a renewable source of a clean gaseous fuel suitable for use in these high efficiency power systems or as a substitute fuel in other combustion devices such as boilers, kilns, or other natural gas fired equipment. This paper discusses the development and commercialization of the Battelle high-throughput gasification process for gas turbine based power generation systems. Projected process economics for a gas turbine combined cycle plant are presented along with a description of integrated system operation coupling a 200kW gas turbine power generation system to a 10 ton per day gasifier, and current commercialization activities. 6 refs., 3 figs., 1 tab.

  5. Power system with an integrated lubrication circuit

    DOE Patents [OSTI]

    Hoff, Brian D.; Akasam, Sivaprasad; Algrain, Marcelo C.; Johnson, Kris W.; Lane, William H.

    2009-11-10

    A power system includes an engine having a first lubrication circuit and at least one auxiliary power unit having a second lubrication circuit. The first lubrication circuit is in fluid communication with the second lubrication circuit.

  6. Interconnection economics of small power systems -- A case study

    SciTech Connect (OSTI)

    Bloethe, W.G.; Thakar, H.C. [Sargent and Lundy, Chicago, IL (United States); Kim, L.C. [Sarawak Electricity Supply Corp., Kuching (Malaysia); Samin, S. [PT PLN Persero, Jakarta (Indonesia)

    1996-11-01

    The advantages of interconnecting large electric power systems has been almost universally accepted in those parts of North America that are not geographically isolated. However, interconnecting power systems can result in significant economic advantages, even in those parts of the world where power systems are small and widely separated. This paper examines two small, isolated power systems on the island of Borneo in Southeast Asia. The Malaysian State of Srawak lies on the north coast of Borneo. With an area of 123,156 square km (47,555 square mi.) and population of 1.7 million, it is the largest, but most sparsely populated, state in the Federation of Malaysia. Its neighbor to the south is the Indonesian Province of West Kalimantan. A study examining the feasibility of interconnecting these two power systems was undertaken in 1994 as a part of the Association of Southeast Asian Nations (ASEAN) initiative to interconnect the power systems in the region. The ASEAN region is characterized by rapidly growing economies and rapid load growth.

  7. Federal Sector

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News & Events Skip navigation links Residential Commercial Industrial Federal Agriculture About five percent of BPA's total electric supply goes to power facilities around...

  8. EA-098 Western Systems Power Pool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-098 Western Systems Power Pool Order authorizing Western Systems Power Pool to export electric energy to Canada PDF icon EA- 98 Western Systems Power Pool More Documents & ...

  9. Concentrating Solar Power Tower System Basics | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tower System Basics Concentrating Solar Power Tower System Basics August 20, 2013 - 5:06pm Addthis In power tower concentrating solar power systems, numerous large, flat, ...

  10. Photovoltaic power generation system free of bypass diodes (Patent...

    Office of Scientific and Technical Information (OSTI)

    Photovoltaic power generation system free of bypass diodes Title: Photovoltaic power generation system free of bypass diodes A photovoltaic power generation system that includes a ...

  11. Power systems | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    systems Subscribe to RSS - Power systems The systems, such as fusion power plants, that would generate electricity from fusion. How Does Fusion Energy Work? Click here to view a cool infographic about fusion energy from the U.S. Department of Energy. Read more about How Does Fusion Energy Work? PPPL engineers design and build state-of-the-art controller for AC to DC converter that manages plasma in upgraded fusion machine The electric current that powers fusion experiments requires superb

  12. Flexibility in 21st Century Power Systems

    SciTech Connect (OSTI)

    Cochran, J.; Miller, M.; Zinaman, O.; Milligan, M.; Arent, D.; Palmintier, B.; O'Malley, M.; Mueller, S.; Lannoye, E.; Tuohy, A.; Kujala, B.; Sommer, M.; Holttinen, H.; Kiviluoma, J.; Soonee, S. K.

    2014-05-01

    Flexibility of operation--the ability of a power system to respond to change in demand and supply--is a characteristic of all power systems. Flexibility is especially prized in twenty-first century power systems, with higher levels of grid-connected variable renewable energy (primarily, wind and solar). This paper summarizes the analytic frameworks that have emerged to measure this characteristic and distills key principles of flexibility for policy makers.

  13. Ramgen Power Systems Inc | Open Energy Information

    Open Energy Info (EERE)

    Power Systems Inc Place: Bellevue, Washington State Zip: 98005 Product: Developer of engines and turbines using ramjet shockwave compression technology. Coordinates: 47.61002,...

  14. Developing Secure Power Systems Professional Competence: Alignment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Professional Competence: Alignment and Gaps in Workforce Development Programs - Phase 2 (JulyAugust 2013) Developing Secure Power Systems Professional Competence: Alignment and ...

  15. INI Power Systems | Open Energy Information

    Open Energy Info (EERE)

    search Name: INI Power Systems Place: Cary, North Carolina Zip: 27513 Product: Direct methanol fuel cells targeted at the portable electronics marketplace. Coordinates: 35.78933,...

  16. Thermoelectric Power Generation System with Loop Thermosyphon...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Thermoelectric Power Generation System with Loop Thermosyphon in Future High Efficiency ... More Documents & Publications Low and high Temperature Dual Thermoelectric Generation ...

  17. Water reactive hydrogen fuel cell power system

    DOE Patents [OSTI]

    Wallace, Andrew P; Melack, John M; Lefenfeld, Michael

    2014-01-21

    A water reactive hydrogen fueled power system includes devices and methods to combine reactant fuel materials and aqueous solutions to generate hydrogen. The generated hydrogen is converted in a fuel cell to provide electricity. The water reactive hydrogen fueled power system includes a fuel cell, a water feed tray, and a fuel cartridge to generate power for portable power electronics. The removable fuel cartridge is encompassed by the water feed tray and fuel cell. The water feed tray is refillable with water by a user. The water is then transferred from the water feed tray into a fuel cartridge to generate hydrogen for the fuel cell which then produces power for the user.

  18. Water reactive hydrogen fuel cell power system

    SciTech Connect (OSTI)

    Wallace, Andrew P; Melack, John M; Lefenfeld, Michael

    2014-11-25

    A water reactive hydrogen fueled power system includes devices and methods to combine reactant fuel materials and aqueous solutions to generate hydrogen. The generated hydrogen is converted in a fuel cell to provide electricity. The water reactive hydrogen fueled power system includes a fuel cell, a water feed tray, and a fuel cartridge to generate power for portable power electronics. The removable fuel cartridge is encompassed by the water feed tray and fuel cell. The water feed tray is refillable with water by a user. The water is then transferred from the water feed tray into the fuel cartridge to generate hydrogen for the fuel cell which then produces power for the user.

  19. A new bipolar Qtrim power supply system

    SciTech Connect (OSTI)

    Mi, C.; Bruno, D.; Drozd, J.; Nolan, T.; Orsatti, F.; Heppener, G.; Di Lieto, A.; Schultheiss, C.; Samms, T.; Zapasek, R.; Sandberg, J.

    2015-05-03

    This year marks the 15th run of RHIC (Relativistic Heavy Ion Collider) operations. The reliability of superconducting magnet power supplies is one of the essential factors in the entire accelerator complex. Besides maintaining existing power supplies and their associated equipment, newly designed systems are also required based on the physicist’s latest requirements. A bipolar power supply was required for this year’s main quadruple trim power supply. This paper will explain the design, prototype, testing, installation and operation of this recently installed power supply system.

  20. Federal Automated Information System of Nuclear Material Control and Accounting: Uniform System of Reporting Documents

    SciTech Connect (OSTI)

    Pitel, M V; Kasumova, L; Babcock, R A; Heinberg, C

    2003-06-12

    One of the fundamental regulations of the Russian State System for Nuclear Material Accounting and Control (SSAC), ''Basic Nuclear Material Control and Accounting Rules,'' directed that a uniform report system be developed to support the operation of the SSAC. According to the ''Regulation on State Nuclear Material Control and Accounting,'' adopted by the Russian Federation Government, Minatom of Russia is response for the development and adoption of report forms, as well as the reporting procedure and schedule. The report forms are being developed in tandem with the creation of an automated national nuclear material control and accounting system, the Federal Information System (FIS). The forms are in different stages of development and implementation. The first report forms (the Summarized Inventory Listing (SIL), Summarized Inventory Change Report (SICR) and federal and agency registers of nuclear material) have already been created and implemented. The second set of reports (nuclear material movement reports and the special anomaly report) is currently in development. A third set of reports (reports on import/export operations, and foreign nuclear material temporarily located in the Russian Federation) is still in the conceptual stage. To facilitate the development of a unified document system, the FIS must establish a uniform philosophy for the reporting system and determine the requirements for each reporting level, adhering to the following principles: completeness--the unified report system provides the entire range of information that the FIS requires to perform SSAC tasks; requisite level of detail; hierarchical structure--each report is based on the information provided in a lower-level report and is the source of information for reports at the next highest level; consistency checking--reports can be checked against other reports. A similar philosophy should eliminate redundancy in the different reports, support a uniform approach to the contents of

  1. EA-98-K Western Systems Power Pool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    K Western Systems Power Pool EA-98-K Western Systems Power Pool Order authorizing Western Systems Power Pool to export electric energy to Canada. EA-98-K Western Systems Power Pool ...

  2. EA-98-C Western Systems Power Pool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C Western Systems Power Pool EA-98-C Western Systems Power Pool Order authorizing Western Systems Power Pool to export electricity to Canada PDF icon EA-98-C Western Systems Power ...

  3. EA-98-H Western Systems Power Pool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    H Western Systems Power Pool EA-98-H Western Systems Power Pool Order Authorizing Western Systems Power Pool to export electric energy to Canada EA-98-H Western Systems Power Pool ...

  4. EA-98-G WESTERN SYSTEMS POWER POOL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    G WESTERN SYSTEMS POWER POOL EA-98-G WESTERN SYSTEMS POWER POOL Order authorizing Western System Power Pool to export electric energy to Canada EA-98-G WESTERN SYSTEMS POWER POOL ...

  5. EA-98-L Western Systems Power Pool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    L Western Systems Power Pool EA-98-L Western Systems Power Pool Order authorizing Western Systems Power Pool to export electric energy to Canada EA-98-L Western Systems Power Pool ...

  6. Point Power Systems | Open Energy Information

    Open Energy Info (EERE)

    systems, ranging from 1-6kW. It has received support from Environmental Business Cluster, a California-based incubator. References: Point Power Systems1 This article is a...

  7. Power Monitoring for Connected Lighting Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Monitoring for Connected Lighting Systems by Jefferay Lawton Senior Product Marketing Engineer Mixed-Signal and Linear Division Microchip Technology Inc. 2 Agenda  Metrology Evolution  Power-Monitoring Implementations  System Characterization  Software  Hardware  Zero-Cal  Distributive Scheme  Power-Monitoring Examples & Uses 3 Metrology Evolution Electric Utility Meters * Strict/high-end requirements * Government regulation * Standards (e.g., IEC62053-21/22) *

  8. High power laser perforating tools and systems

    DOE Patents [OSTI]

    Zediker, Mark S; Rinzler, Charles C; Faircloth, Brian O; Koblick, Yeshaya; Moxley, Joel F

    2014-04-22

    ystems devices and methods for the transmission of 1 kW or more of laser energy deep into the earth and for the suppression of associated nonlinear phenomena. Systems, devices and methods for the laser perforation of a borehole in the earth. These systems can deliver high power laser energy down a deep borehole, while maintaining the high power to perforate such boreholes.

  9. Notice of Availability of a Preliminary List of Standby Power Products and Testing Guidelines, Federal Register, 66 FR 67517, December 31, 2001

    Broader source: Energy.gov [DOE]

    Document displays the notice of availability of a preliminary list of standby power products and testing guidelines, which was published in the Federal Register on December 31, 2001.

  10. Application to Export Electric Energy OE Docket No. EA-357 Hunt Electric Power Marketing, L.L.C.: Federal Register Notice Volume 74, No. 117- Jun. 19, 2009

    Broader source: Energy.gov [DOE]

    Application from Hunt Electric Power Marketing, L.L.C. to export electric energy to Mexico. Federal Register Notice Vol 74 No 117

  11. EA-098-E Western Systems Power Pool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    E Western Systems Power Pool EA-098-E Western Systems Power Pool Order authorizing Western Systems Power Pool to export electric energy to Canada EA- 98-E Western Systems Power Pool (13.43 KB) More Documents & Publications EA-98-G WESTERN SYSTEMS POWER POOL EA-98-F, Western Systems Power Pool EA-98-M Members of WSPP, Inc.

  12. Electricity for road transport, flexible power systems and wind...

    Open Energy Info (EERE)

    systems and wind power (Smart Grid Project) Jump to: navigation, search Project Name Electricity for road transport, flexible power systems and wind power Country Denmark...

  13. EA-98-I Western Systems Power Pool | Department of Energy

    Energy Savers [EERE]

    Power Pool Order authorizing Western Systems Power Pool to export electric energy to Canada. PDF icon EA-98-I Western Systems Power Pool More Documents & Publications Application...

  14. Energy Storage Systems 2007 Peer Review - Power Electronics Presentati...

    Office of Environmental Management (EM)

    Power Electronics Presentations Energy Storage Systems 2007 Peer Review - Power Electronics ... 2007 Peer Review - SiC Power Converter System Thermal Mgmt and High Temp Packaging - ...

  15. FEMP Offers Training on Federal On-Site Renewable Power Purchase...

    Broader source: Energy.gov (indexed) [DOE]

    the request for proposal process, key approvals, and FEMP support and assistance. ... FEMP eTraining core courses are designed for federal energy and facility managers but are ...

  16. Ocean Renewable Power Co (ORPC) (TRL 7 8 System)- TidGen (TM) Power System Commercialization Project

    Broader source: Energy.gov [DOE]

    Ocean Renewable Power Co (ORPC) (TRL 7 8 System) - TidGen (TM) Power System Commercialization Project

  17. Princeton Power Systems (TRL 5 6 Component)- Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage

    Broader source: Energy.gov [DOE]

    Princeton Power Systems (TRL 5 6 Component) - Marine High-Voltage Power Conditioning and Transmission System with Integrated Energy Storage

  18. Control system and method for a universal power conditioning...

    Office of Scientific and Technical Information (OSTI)

    Control system and method for a universal power conditioning system Citation Details In-Document Search Title: Control system and method for a universal power conditioning system A ...

  19. Doublet III neutral beam power system

    SciTech Connect (OSTI)

    Nerem, A.; Beal, J.W.; Colleraine, A.P.; LeVine, F.H.; Pipkins, J.F.; Remsen, D.B. Jr.; Tooker, J.F.; Varga, H.J.; Franck, J.V.

    1981-01-01

    The Doublet III neutral beam power system supplies pulsed power to the neutral beam injectors for plasma heating experiments on the Doublet III tokamak. The power supply system is connected to an ion source where the power is converted to an 80 kV, 80A, 0.5 sec beam of hydrogen ions at maximum power output. These energetic ions undergo partial neutralization via charge exchange in the beamline. The energetic neutral hydrogen atoms pass through the Doublet III toroidal and poloidal magnet fields and deposit their energy in the confined plasma. The unneutralized ions are deflected into a water-cooled dump. The entire system is interfaced through the neutral beam computer instrumentation and control system.

  20. Heatpipe space power and propulsion systems

    SciTech Connect (OSTI)

    Houts, M.G.; Poston, D.I.; Ranken, W.A.

    1995-12-01

    Safe, reliable, low-mass space power and propulsion systems could have numerous civilian and military applications. This paper discusses two fission-powered concepts: The Heatpipe Power System (HPS), which provides power only; and the Heatpipe Bimodal System (HBS), which provides both power and thermal propulsion. Both concepts have 10 important features. First, only existing technology and recently tested fuel forms are used. Second, fuel can be removed whenever desired, which greatly facilitates system fabrication and handling. Third, full electrically heated system testing of all modes is possible, with minimal operations required to replace the heaters with fuel and to ready the system for launch. Fourth, the systems are passively subcritical during launch accidents. Fifth, a modular approach is used, and most technical issues can be resolved with inexpensive module tests. Sixth, bonds between dissimilar metals are minimized. Seventh, there are no single-point failures during power mode operation. Eighth, the fuel burnup rate is quite low to help ensure >10-yr system life. Ninth, there are no pumped coolant loops, and the systems can be shut down and restarted without coolant freeze/thaw concerns. Finally, full ground nuclear test is not needed, and development costs will be low. One design for a low-power HPS uses SNAP-10A-style thermoelectric power converters to produce 5 kWe at a system mass of {approximately}500 kg. The unicouple thermoelectric converters have a hot-shoe temperature of 1275 K and reject waste heat at 775 K. This type of thermoelectric converter has been used extensively by the space program and has demonstrated an operational lifetime of decades. A core with a larger number of smaller modules (same overall size) can be used to provide up to 500 kWt to a power conversion subsystem, and a slightly larger core using a higher heatpipe to fuel ratio can provide >1 MWt.

  1. Multi-Megawatt Power System Trade Study

    SciTech Connect (OSTI)

    Longhurst, Glen Reed; Schnitzler, Bruce Gordon; Parks, Benjamin Travis

    2001-11-01

    As part of a larger task, the Idaho National Engineering and Environmental Laboratory (INEEL) was tasked to perform a trade study comparing liquid-metal cooled reactors having Rankine power conversion systems with gas-cooled reactors having Brayton power conversion systems. This report summarizes the approach, the methodology, and the results of that trade study. Findings suggest that either approach has the possibility to approach the target specific mass of 3-5 kg/kWe for the power system, though it appears either will require improvements to achieve that. Higher reactor temperatures have the most potential for reducing the specific mass of gas-cooled reactors but do not necessarily have a similar effect for liquid-cooled Rankine systems. Fuels development will be the key to higher reactor operating temperatures. Higher temperature turbines will be important for Brayton systems. Both replacing lithium coolant in the primary circuit with gallium and replacing potassium with sodium in the power loop for liquid systems increase system specific mass. Changing the feed pump turbine to an electric motor in Rankine systems has little effect. Key technologies in reducing specific mass are high reactor and radiator operating temperatures, low radiator areal density, and low turbine/generator system masses. Turbine/generator mass tends to dominate overall power system mass for Rankine systems. Radiator mass was dominant for Brayton systems.

  2. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.3

    SciTech Connect (OSTI)

    Burford, M.J.; Burnett, R.A.; Downing, T.R.

    1996-12-01

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the (Pacific Northwest National Laboratory) (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. 91 This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login, privileges, and usage. The system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment.

  3. Electric Power System Asset Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... generation DMS Distributed management system DOE Department of Energy DR Demand response DUE Distribution utility enterprise EAC Electricity Advisory Committee EAM ...

  4. Parallel Implementation of Power System Dynamic Simulation

    SciTech Connect (OSTI)

    Jin, Shuangshuang; Huang, Zhenyu; Diao, Ruisheng; Wu, Di; Chen, Yousu

    2013-07-21

    Dynamic simulation of power system transient stability is important for planning, monitoring, operation, and control of electrical power systems. However, modeling the system dynamics and network involves the computationally intensive time-domain solution of numerous differential and algebraic equations (DAE). This results in a transient stability implementation that may not maintain the real-time constraints of an online security assessment. This paper presents a parallel implementation of the dynamic simulation on a high-performance computing (HPC) platform using parallel simulation algorithms and computation architectures. It enables the simulation to run even faster than real time, enabling the look-ahead capability of upcoming stability problems in the power grid.

  5. bulk power system | OpenEI Community

    Open Energy Info (EERE)

    Dc(266) Contributor 31 October, 2014 - 10:58 What do you know about the grid? black out brown out bulk power system electricity grid future grid grid history security Smart Grid...

  6. Columbia Power System | Open Energy Information

    Open Energy Info (EERE)

    931-388-4833 Website: www.cpws.com Facebook: https:www.facebook.compagesColumbia-Power-Water-Systems123897314290346 Outage Hotline: 931-388-4833 References: EIA Form...

  7. Proton Power Systems Plc | Open Energy Information

    Open Energy Info (EERE)

    Power Systems Plc Place: Starnberg, Bavaria, Germany Zip: D-82319 Sector: Hydro, Hydrogen Product: UK-based parent company of Proton Motor GmbH, which operates in Germany. The...

  8. PowerGenix Systems | Open Energy Information

    Open Energy Info (EERE)

    California Zip: 92131-1109 Product: Develops high-discharge nickel-zinc rechargeable batteries. References: PowerGenix Systems1 This article is a stub. You can help OpenEI by...

  9. Variable pressure power cycle and control system

    DOE Patents [OSTI]

    Goldsberry, Fred L.

    1984-11-27

    A variable pressure power cycle and control system that is adjustable to a variable heat source is disclosed. The power cycle adjusts itself to the heat source so that a minimal temperature difference is maintained between the heat source fluid and the power cycle working fluid, thereby substantially matching the thermodynamic envelope of the power cycle to the thermodynamic envelope of the heat source. Adjustments are made by sensing the inlet temperature of the heat source fluid and then setting a superheated vapor temperature and pressure to achieve a minimum temperature difference between the heat source fluid and the working fluid.

  10. Power Air H Plus Korean Back up Power System JV | Open Energy...

    Open Energy Info (EERE)

    Plus Korean Back up Power System JV Jump to: navigation, search Name: Power AirH-Plus Korean Back-up Power System JV Place: Korea (Republic) Product: Power Air signed a MOU with...

  11. Solar thermal power systems. Summary report

    SciTech Connect (OSTI)

    Not Available

    1980-06-01

    The work accomplished by the Aerospace Corporation from April 1973 through November 1979 in the mission analysis of solar thermal power systems is summarized. Sponsorship of this effort was initiated by the National Science Foundation, continued by the Energy Research and Development Administration, and most recently directed by the United States Department of Energy, Division of Solar Thermal Systems. Major findings and conclusions are sumarized for large power systems, small power systems, solar total energy systems, and solar irrigation systems, as well as special studies in the areas of energy storage, industrial process heat, and solar fuels and chemicals. The various data bases and computer programs utilized in these studies are described, and tables are provided listing financial and solar cost assumptions for each study. An extensive bibliography is included to facilitate review of specific study results and methodology.

  12. Heavy Vehicle Essential Power Systems Workshop

    SciTech Connect (OSTI)

    Susan Rogers

    2001-12-12

    Essential power is a crosscutting technology area that addresses the efficient and practical management of electrical and thermal requirements on trucks. Essential Power Systems: any function on the truck, that is not currently involved in moving the truck, and requires electrical or mechanical energy; Truck Lights; Hotel Loads (HVAC, computers, appliances, lighting, entertainment systems); Pumps, starter, compressor, fans, trailer refrigeration; Engine and fuel heating; and Operation of power lifts and pumps for bulk fluid transfer. Transition from ''belt and gear driven'' to auxiliary power generation of electricity - ''Truck Electrification'' 42 volts, DC and/ or AC; All electrically driven auxiliaries; Power on demand - manage electrical loads; Benefits include: increased fuel efficiency, reduced emission both when truck is idling and moving down the road.

  13. Power electronics system modeling and simulation (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    Title: Power electronics system modeling and simulation This paper introduces control system design based softwares, SIMNON and MATLABSIMULINK, for power electronics system ...

  14. GE Hybrid Power Generation Systems | Open Energy Information

    Open Energy Info (EERE)

    Name: GE Hybrid Power Generation Systems Place: Georgia Zip: Atlanta Product: Focused on fuel cell stack and system development. References: GE Hybrid Power Generation Systems1...

  15. SolarPower Restoration Systems Inc | Open Energy Information

    Open Energy Info (EERE)

    Solar Product: SolarPower Restoration Systems is pursuing Building Integrated Photovoltaics (BIPV) systems and large scale Photovoltaic Power (PV) Array Systems over concrete...

  16. Power supply system for heat and electricity

    SciTech Connect (OSTI)

    Hafner, G.; Finger, H.; Lenz, H.

    1985-03-05

    A power supply system for generating at least one of heat and electricity which includes a number of statically and functionally independent units adapted to generate at least one of heat and electricity which enable a maximum utilization of primary energy. For decentralized power supply over short and low loss supply lines the individual units are constructed as stackable modules. By exchanging or adding one or more modules, it is possible to adapt the flexibility of the power supply system to changes in demand for the energy thereby providing a practical approach to the utilization of waste heat for energy conservation purposes.

  17. EA-098-D Western Systems Power Pool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    D Western Systems Power Pool EA-098-D Western Systems Power Pool Order authorizing Western Systems Power Pool to export electric energy to Canada PDF icon EA- 98-D Western Systems ...

  18. EA-98-F, Western Systems Power Pool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    F, Western Systems Power Pool EA-98-F, Western Systems Power Pool Order authorizing Western Systems Power Pool to export electric energy to Canada PDF icon EA-98-F, Western Systems ...

  19. EA-98-J Western Systems Power Pool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    J Western Systems Power Pool EA-98-J Western Systems Power Pool Order authorizing Western Systems Power Pool to export electric energy to Canada PDF icon EA-98-J Western Systems ...

  20. Life extension system for fossil power plants

    SciTech Connect (OSTI)

    Isreb, M.

    1996-11-01

    A general, multi-disciplinary life extension system for new and existing power plants has been absent in the literature. The present paper presents a general, multi-disciplinary life extension system for new and existing fossil power plants. The paper formulates the optimization problem framework for plants` components. The paper discusses the framework of the iterative process, objective functions, plant components, life extension constraints, new life or remnant life parameters and optimization techniques. Other system attributes discussed in the paper include: design invariant parameters, relationships between plant components and objective functions and a strategy for system sizing and simulation.

  1. Wireless Technologies Implications for Power Systems

    SciTech Connect (OSTI)

    Fuhr, Peter L; Manges, Wayne W; Schweitzer, Patrick; Kagan, Hesh

    2010-01-01

    Wireless technologies have advanced well beyond simple SCADA radio systems and point-to-point links. The current applications supported by industrial-grade wireless sensors and systems range from field measurements (classic I/O) to voice, video, asset tracking, mobile operators, etc. Which such a wide array of supported applications, the belief that wireless technology will only impact power systems in terms of wireless sensors is shortsighted. This paper, coauthored by a group of individuals intimately involved in the general realm of industrial wireless , presents a simple snapshot of current radio technologies that are used (or seriously contemplated for use) in power systems.

  2. Investigation of expert system application to spacecraft power system control

    SciTech Connect (OSTI)

    Pistole, C.; Bein, J.

    1984-08-01

    This paper addresses the application of expert systems to spacecraft power system control through investigation of two salient technical issues. These are the maximum speed of an expert system, and interaction between the expert system and transient phenomena. The basis of this discussion will be test data obtained through development of the Fault Isolation Expert System (FIES) at Martin Marietta Aerospace Denver. The expert system was tested to determine the minimum time required to clear a power system fault. This response time will be compared to conventional fault handling techniques, and analyzed to determine the maximum bandwidth of the system to be controlled. The second issue to be investigated is the relationship between expert system speed and power system transients. Specifically, FIES is intended to deal with quasi steady state inputs only. Therefore, expert system inputs must be filtered to eliminate the interaction between the expert system and transient phenomena. This paper will discuss the considerations involved in the tailoring of inputs.

  3. Small geothermal electric systems for remote powering

    SciTech Connect (OSTI)

    Entingh, Daniel J.; Easwaran, Eyob.; McLarty, Lynn

    1994-08-08

    This report describes conditions and costs at which quite small (100 to 1,000 kilowatt) geothermal systems could be used for off-grid powering at remote locations. This is a first step in a larger process of determining locations and conditions at which markets for such systems could be developed. The results suggest that small geothermal systems offer substantial economic and environmental advantages for powering off-grid towns and villages. Geothermal power is most likely to be economic if the system size is 300 kW or greater, down to reservoir temperatures of 100{degree}C. For system sizes smaller than 300 kW, the economics can be favorable if the reservoir temperature is about 120{degree}C or above. Important markets include sites remote from grids in many developing and developed countries. Estimates of geothermal resources in many developing countries are shown.

  4. Multi Megawatt Power System Analysis Report

    SciTech Connect (OSTI)

    Longhurst, Glen Reed; Harvego, Edwin Allan; Schnitzler, Bruce Gordon; Seifert, Gary Dean; Sharpe, John Phillip; Verrill, Donald Alan; Watts, Kenneth Donald; Parks, Benjamin Travis

    2001-11-01

    Missions to the outer planets or to near-by planets requiring short times and/or increased payload carrying capability will benefit from nuclear power. A concept study was undertaken to evaluate options for a multi-megawatt power source for nuclear electric propulsion. The nominal electric power requirement was set at 15 MWe with an assumed mission profile of 120 days at full power, 60 days in hot standby, and another 120 days of full power, repeated several times for 7 years of service. Of the numerous options considered, two that appeared to have the greatest promise were a gas-cooled reactor based on the NERVA Derivative design, operating a closed cycle Brayton power conversion system; and a molten lithium-cooled reactor based on SP-100 technology, driving a boiling potassium Rankine power conversion system. This study examined the relative merits of these two systems, seeking to optimize the specific mass. Conclusions were that either concept appeared capable of approaching the specific mass goal of 3-5 kg/kWe estimated to be needed for this class of mission, though neither could be realized without substantial development in reactor fuels technology, thermal radiator mass efficiency, and power conversion and distribution electronics and systems capable of operating at high temperatures. Though the gas-Brayton systems showed an apparent advantage in specific mass, differences in the degree of conservatism inherent in the models used suggests expectations for the two approaches may be similar. Brayton systems eliminate the need to deal with two-phase flows in the microgravity environment of space.

  5. POWER GENERATING NEUTRONIC REACTOR SYSTEM

    DOE Patents [OSTI]

    Vernon, H.C.

    1958-03-01

    This patent relates to reactor systems of the type wherein the cooiing medium is a liquid which is converted by the heat of the reaction to steam which is conveyed directly to a pnime mover such as a steam turbine driving a generatore after which it is condensed and returred to the coolant circuit. In this design, the reactor core is disposed within a tank for containing either a slurry type fuel or an aggregation of solid fuel elements such as elongated rods submerged in a liquid moderator such as heavy water. The top of the tank is provided with a nozzle which extends into an expansion chamber connected with the upper end of the tank, the coolant being maintained in the expansion chamber at a level above the nozzle and the steam being formed in the expansion chamber.

  6. Pacific Northwest Electric Power Planning and Conservation Act : Legislative History of the Act to Assist the Electrical Consumers of the Pacific Northwest through use of the Federal Columbia River Power System to Achieve Cost-Effective Energy Conservation : P.L. 96-501, 94 Stat. 2697.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1981-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act became effective when it was signed into law by President Carter on December 5, 1980. This ended a four-year debate over legislation designed to plan and coordinate the region's energy future. This legislative history is an abbreviated version taken from the larger historical file maintained by the BPA Law Library. It is intended to assist BPA personnel and others who are studying the Northwest Power Act and working on its implementation. The documents included were selected for their value in determining what Congress meant in enacting the statute and to provide the researcher with a starting point for further investigation. These documents include: a history of the Act, a chronology of the legislative action leading to passage of the law; a section-by-section analysis of the Act; the Congressional Records of Senate and House debates on the bill and its amendments, and a list of Congressional committee hearings.

  7. Federal Loan Guarantees for Projects that Manufacture Commercial Technology Renewable Energy Systems and Components: August 10, 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    Federal Loan Guarantees for Projects that Manufacture Commercial Technology Renewable Energy Systems and Components: August 10, 2010

  8. Policy for Federal Oversight and Contractor Assurance Systems

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-08-09

    This Policy establishes the Department of Energy’s (DOE) expectations for the implementation of a comprehensive and robust oversight process that enables the Department’s mission to be accomplished effectively, efficiently, safely, and securely by utilizing and leveraging the outcomes and information from effective Contractor Assurance Systems (CAS) to inform the Government’s oversight wherever appropriate.

  9. Wind for Schools Project Power System Brief, Wind Powering America Fact Sheet Series

    Wind Powering America (EERE)

    Wind Powering America Fact Sheet Series Energy Efficiency & Renewable Energy Wind for Schools Project Power System Brief Wind for Schools Project Power System Brief Wind for Schools Project Power System Brief This fact sheet provides an overview of the system components of a Wind Powering America Wind for Schools project. Wind Powering America's (WPA's) Wind for Schools project uses a basic system configuration for each school project. The system incorporates a single SkyStream(tm) wind

  10. System Study: Emergency Power System 1998-2014

    SciTech Connect (OSTI)

    Schroeder, John Alton

    2015-12-01

    This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. An extremely statistically significant increasing trend was observed for EPS system unreliability for an 8-hour mission. A statistically significant increasing trend was observed for EPS system start-only unreliability.

  11. Naturalistic Decision Making For Power System Operators

    SciTech Connect (OSTI)

    Greitzer, Frank L.; Podmore, Robin; Robinson, Marck; Ey, Pamela

    2009-06-23

    Abstract: Motivation -- As indicated by the Blackout of 2003, the North American interconnected electric system is vulnerable to cascading outages and widespread blackouts. Investigations of large scale outages often attribute the causes to the three T’s: Trees, Training and Tools. A systematic approach has been developed to document and understand the mental processes that an expert power system operator uses when making critical decisions. The approach has been developed and refined as part of a capability demonstration of a high-fidelity real-time power system simulator under normal and emergency conditions. To examine naturalistic decision making (NDM) processes, transcripts of operator-to-operator conversations are analyzed to reveal and assess NDM-based performance criteria. Findings/Design -- The results of the study indicate that we can map the Situation Awareness Level of the operators at each point in the scenario. We can also identify clearly what mental models and mental simulations are being performed at different points in the scenario. As a result of this research we expect that we can identify improved training methods and improved analytical and visualization tools for power system operators. Originality/Value -- The research applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message -- The NDM approach provides an ideal framework for systematic training management and mitigation to accelerate learning in team-based training scenarios with high-fidelity power grid simulators.

  12. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.4

    SciTech Connect (OSTI)

    Arp, J.A.; Burnett, R.A.; Downing, T.R.

    1997-11-21

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login privileges, and usage. The system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via telecommunications links.

  13. Power System Dispatcher | Department of Energy

    Energy Savers [EERE]

    Energy Electronics Research and Development Program Plan Power Electronics Research and Development Program Plan As the United States transitions to a digital economy, the need to upgrade the nation's aging electric grid is becoming increasingly evident. Electricity demand is projected to increase by 30% between 2008 and 2035,1 and the U.S. electricity delivery system must be able to meet this demand and ensure the continued supply of reliable, secure electricity. Power Electronics Research

  14. A novel power block for CSP systems

    SciTech Connect (OSTI)

    Mittelman, Gur; Epstein, Michael

    2010-10-15

    Concentrating Solar Thermal Power (CSP) and in particular parabolic trough, is a proven large-scale solar power technology. However, CSP cost is not yet competitive with conventional alternatives unless subsidized. Current CSP plants typically include a condensing steam cycle power block which was preferably designed for a continuous operation and higher operating conditions and therefore, limits the overall plant cost effectiveness and deployment. The drawbacks of this power block are as follows: (i) no power generation during low insolation periods (ii) expensive, large condenser (typically water cooled) due to the poor extracted steam properties (high specific volume, sub-atmospheric pressure) and (iii) high installation and operation costs. In the current study, a different power block scheme is proposed to eliminate these obstacles. This power block includes a top Rankine cycle with a back pressure steam turbine and a bottoming Kalina cycle comprising another back pressure turbine and using ammonia-water mixture as a working fluid. The bottoming (moderate temperature) cycle allows power production during low insolation periods. Because of the superior ammonia-water vapor properties, the condensing system requirements are much less demanding and the operation costs are lowered. Accordingly, air cooled condensers can be used with lower economical penalty. Another advantage is that back pressure steam turbines have a less complex design than condensing steam turbines which make their costs lower. All of these improvements could make the combined cycle unit more cost effective. This unit can be applicable in both parabolic trough and central receiver (solar tower) plants. The potential advantage of the new power block is illustrated by a detailed techno-economical analysis of two 50 MW parabolic trough power plants, comparing between the standard and the novel power block. The results indicate that the proposed plant suggests a 4-11% electricity cost saving

  15. Future Power Systems 21 - The Smart Customer | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 - The Smart Customer Future Power Systems 21 - The Smart Customer Future Power Systems 21 - The Smart Customer: From Future Power Systems (FPS) articles 18 and 19 we can see that ...

  16. Land Record System PIA, Bonneville Power Administration | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration (61.28 KB) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

  17. Radiation beam calorimetric power measurement system

    DOE Patents [OSTI]

    Baker, John; Collins, Leland F.; Kuklo, Thomas C.; Micali, James V.

    1992-01-01

    A radiation beam calorimetric power measurement system for measuring the average power of a beam such as a laser beam, including a calorimeter configured to operate over a wide range of coolant flow rates and being cooled by continuously flowing coolant for absorbing light from a laser beam to convert the laser beam energy into heat. The system further includes a flow meter for measuring the coolant flow in the calorimeter and a pair of thermistors for measuring the temperature difference between the coolant inputs and outputs to the calorimeter. The system also includes a microprocessor for processing the measured coolant flow rate and the measured temperature difference to determine the average power of the laser beam.

  18. Modeling Power System Operation with Intermittent Resources

    SciTech Connect (OSTI)

    Marinovici, Maria C.; Kirkham, Harold; Glass, Kevin A.; Carlsen, Leif C.

    2013-02-27

    Electricity generating companies and power system operators face the need to minimize total fuel cost or maximize total profit over a given time period. These issues become optimization problems subject to a large number of constraints that must be satisfied simultaneously. The grid updates due to smart-grid technologies plus the penetration of intermittent re- sources in electrical grid introduce additional complexity to the optimization problem. The Renewable Integration Model (RIM) is a computer model of interconnected power system. It is intended to provide insight and advice on complex power systems management, as well as answers to integration of renewable energy questions. This paper describes RIM basic design concept, solution method, and the initial suite of modules that it supports.

  19. Moltech Power Systems Group MPS Group | Open Energy Information

    Open Energy Info (EERE)

    Moltech Power Systems Group MPS Group Jump to: navigation, search Name: Moltech Power Systems Group (MPS Group) Place: China Product: China-based subsidiary of Shanghai Huayi Group...

  20. Future Power Systems 20: The Smart Enterprise, its Objective...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: The Smart Enterprise, its Objective and Forecasting. Future Power Systems 20: The Smart Enterprise, its Objective and Forecasting. Future Power Systems 20: The Smart Enterprise, ...

  1. Center for Advanced Power Systems CAPS | Open Energy Information

    Open Energy Info (EERE)

    Focused on advanced power system technologies with emphasis on the needs of the future naval ship power systems and electricity supply grid of the US. References: Center for...

  2. Battery Park Industries Inc formerly Moltech Power Systems Inc...

    Open Energy Info (EERE)

    Industries Inc formerly Moltech Power Systems Inc Jump to: navigation, search Name: Battery Park Industries Inc (formerly Moltech Power Systems, Inc) Place: Gainesville, Florida...

  3. GWPS Global Wind Power Systems | Open Energy Information

    Open Energy Info (EERE)

    GWPS Global Wind Power Systems Jump to: navigation, search Name: GWPS (Global Wind Power Systems) Place: Hamburg, Germany Zip: 20095 Sector: Wind energy Product: Company...

  4. Ultra Efficient Combined Heat, Hydrogen, and Power System - Fact...

    Energy Savers [EERE]

    Ultra Efficient Combined Heat, Hydrogen, and Power System - Fact Sheet, 2015 Ultra Efficient Combined Heat, Hydrogen, and Power System - Fact Sheet, 2015 FuelCell Energy, Inc., in ...

  5. Electricity storage for short term power system service (Smart...

    Open Energy Info (EERE)

    storage for short term power system service (Smart Grid Project) Jump to: navigation, search Project Name Electricity storage for short term power system service Country Denmark...

  6. Siemens Concentrated Solar Power Ltd previously Solel Solar Systems...

    Open Energy Info (EERE)

    Siemens Concentrated Solar Power Ltd previously Solel Solar Systems Jump to: navigation, search Name: Siemens Concentrated Solar Power Ltd (previously Solel Solar Systems) Place:...

  7. Systems for Electrical Power from Coproduced and Low Temperature...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems for Electrical Power from Coproduced and Low Temperature Geothermal Resources Systems for Electrical Power from Coproduced and Low Temperature Geothermal Resources ...

  8. Thermoelectrics: From Space Power Systems to Terrestrial Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Thermoelectrics: From Space Power Systems to Terrestrial Waste Heat Recovery Applications Thermoelectrics: From Space Power Systems to Terrestrial Waste Heat Recovery Applications ...

  9. International Rectifier Power Control Systems | Open Energy Informatio...

    Open Energy Info (EERE)

    Power Control Systems Jump to: navigation, search Name: International Rectifier Power Control Systems Place: El Segundo, California Zip: 90245 Product: Originally a division of...

  10. Space and Defense Power Systems | Department of Energy

    Energy Savers [EERE]

    Department's office of Nuclear Energy and NASA, Radioisotope Power Systems have been ... Department's office of Nuclear Energy and NASA, Radioisotope Power Systems have been ...

  11. System Definition and Analysis: Power Plant Design and Layout...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    System Definition and Analysis: Power Plant Design and Layout Citation Details In-Document Search Title: System Definition and Analysis: Power Plant Design and Layout You are ...

  12. Seismic Retrofit for Electric Power Systems

    SciTech Connect (OSTI)

    Romero, Natalia; Nozick, Linda K.; Dobson, Ian; Xu, Ningxiong; Jones, Dean A.

    2015-05-01

    Our paper develops a two-stage stochastic program and solution procedure to optimize the selection of seismic retrofit strategies to increase the resilience of electric power systems against earthquake hazards. The model explicitly considers the range of earthquake events that are possible and, for each, an approximation of the distribution of damage experienced. Furthermore, this is important because electric power systems are spatially distributed and so their performance is driven by the distribution of component damage. We also test this solution procedure against the nonlinear integer solver in LINGO 13 and apply the formulation and solution strategy to the Eastern Interconnection, where seismic hazard stems from the New Madrid seismic zone.

  13. Hybrid electric vehicle power management system

    SciTech Connect (OSTI)

    Bissontz, Jay E.

    2015-08-25

    Level voltage levels/states of charge are maintained among a plurality of high voltage DC electrical storage devices/traction battery packs that are arrayed in series to support operation of a hybrid electric vehicle drive train. Each high voltage DC electrical storage device supports a high voltage power bus, to which at least one controllable load is connected, and at least a first lower voltage level electrical distribution system. The rate of power transfer from the high voltage DC electrical storage devices to the at least first lower voltage electrical distribution system is controlled by DC-DC converters.

  14. Federal Emergency Management Information System (FEMIS) System Administration Guide for FEMIS Version 1.4.6

    SciTech Connect (OSTI)

    Arp, J.A.; Bower, J.C.; Burnett, R.A.; Carter, R.J.; Downing, T.R.; Fangman, P.M.; Gerhardstein, L.H.; Homer, B.J.; Johnson, D.M.; Johnson, R.L.; Johnson, S.M.; Loveall, R.M.; Martin, T.J.; Millard, W.D.; Schulze, S.A.; Stoops, L.R.; Tzemos, S.; Wood, B.M.

    1999-06-29

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are corrected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication data distribution and notification functionality necessary to operate FEMIS in a networked, client/server environment.

  15. Systems and methods for an integrated electrical sub-system powered by wind energy

    DOE Patents [OSTI]

    Liu, Yan; Garces, Luis Jose

    2008-06-24

    Various embodiments relate to systems and methods related to an integrated electrically-powered sub-system and wind power system including a wind power source, an electrically-powered sub-system coupled to and at least partially powered by the wind power source, the electrically-powered sub-system being coupled to the wind power source through power converters, and a supervisory controller coupled to the wind power source and the electrically-powered sub-system to monitor and manage the integrated electrically-powered sub-system and wind power system.

  16. LED lamp power management system and method

    DOE Patents [OSTI]

    Gaines, James; Clauberg, Bernd; Van Erp, Josephus A. M.

    2013-03-19

    An LED lamp power management system and method including an LED lamp having an LED controller 58; a plurality of LED channels 60 operably connected to the LED controller 58, each of the plurality of LED channels 60 having a channel switch 62 in series with at least one shunted LED circuit 83, the shunted LED circuit 83 having a shunt switch 68 in parallel with an LED source 80. The LED controller 58 reduces power loss in one of the channel switch 62 and the shunt switch 68 when LED lamp electronics power loss (P.sub.loss) exceeds an LED lamp electronics power loss limit (P.sub.lim); and each of the channel switches 62 receives a channel switch control signal 63 from the LED controller 58 and each of the shunt switches 68 receives a shunt switch control signal 69 from the LED controller 58.

  17. Strategic planning for power system restorations

    SciTech Connect (OSTI)

    Bent, Russell W; Van Hententyck, Pascal; Coffrin, Carleton

    2010-10-12

    This paper considers the power system restoration planning problem (PSRPP) for disaster recovery, a fundamental problem faced by all populated areas. PSRPPs are complex stochastic optimization problems that combine resource allocation, warehouse location, and vehicle routing considerations. Furthermore, electrical power systems are complex systems whose behavior can only be determined by physics simulations. Moreover, these problems must be solved under tight runtime constraints to be practical in real-world disaster situations. This work is three fold: (1) it formalizes the specification of PSRPPs; (2) introduces a simple optimization-simulation hybridization necessary for solving PSRPPs; and (3) presents a complete restoration algorithm that utilizes the strengths of mixed integer programming, constraint programming, and large neighborhood search. This paper studied a novel problem in the field of humanitarian logistics, the Power System Restoration Problem (PSRPP). The PSRPP models the strategic planning process for post disaster power system recovery. The paper proposed a multi-stage stochastic hybrid optimization algorithm that yields high quality solutions to real-world benchmarks provided by Los Alamos National Laboratory (LANL). The algorithm uses a variety of technologies, including MIP, constraint programming, and large neighborhood search, to exploit the structure of each individual optimization subproblem. The experimental results on hurricane disaster benchmarks indicate that the algorithm is practical from a computational standpoint and produce significant improvements over existing relief delivery procedures.

  18. Communication Simulations for Power System Applications

    SciTech Connect (OSTI)

    Fuller, Jason C.; Ciraci, Selim; Daily, Jeffrey A.; Fisher, Andrew R.; Hauer, Matthew L.

    2013-05-29

    New smart grid technologies and concepts, such as dynamic pricing, demand response, dynamic state estimation, and wide area monitoring, protection, and control, are expected to require considerable communication resources. As the cost of retrofit can be high, future power grids will require the integration of high-speed, secure connections with legacy communication systems, while still providing adequate system control and security. While considerable work has been performed to create co-simulators for the power domain with load models and market operations, limited work has been performed in integrating communications directly into a power domain solver. The simulation of communication and power systems will become more important as the two systems become more inter-related. This paper will discuss ongoing work at Pacific Northwest National Laboratory to create a flexible, high-speed power and communication system co-simulator for smart grid applications. The framework for the software will be described, including architecture considerations for modular, high performance computing and large-scale scalability (serialization, load balancing, partitioning, cross-platform support, etc.). The current simulator supports the ns-3 (telecommunications) and GridLAB-D (distribution systems) simulators. Ongoing and future work will be described, including planned future expansions for a traditional transmission solver. A test case using the co-simulator, utilizing a transactive demand response system created for the Olympic Peninsula and AEP gridSMART demonstrations, requiring two-way communication between distributed and centralized market devices, will be used to demonstrate the value and intended purpose of the co-simulation environment.

  19. Career Map: Power Systems/Transmission Engineer | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems/Transmission Engineer Career Map: Power Systems/Transmission Engineer A stretch of wind turbines and power lines at dusk. Power Systems/Transmission Engineer Position Title Power Systems/Transmission Engineer Alternate Title(s) Electric Power Engineer, Electrical Interconnection Engineer, Electrical Design Engineer Education & Training Level Advanced, Bachelors required, prefer graduate degree Education & Training Level Description Power Systems Engineers typically have a

  20. Smart Grid - Transforming Power System Operations

    SciTech Connect (OSTI)

    Widergren, Steven E.; Kirkham, Harold

    2010-04-28

    AbstractElectric power systems are entering a new realm of operations. Large amounts of variable generation tax our ability to reliably operate the system. Couple this with a greater reliance on the electricity network to serve consumer demand that is likely to rise significantly even as we drive for greater efficiency. Trade-offs between energy and environmental needs will be constantly negotiated, while a reliable supply of electricity needs even greater assurance in a world where threats of disruption have risen. Smart grid capabilities are being proposed to help address the challenges confronting system operations. This paper reviews the impact of smart grid functionality on transforming power system operations. It explores models for distributed energy resources (DER generation, storage, and load) that are appearing on the system. It reviews the evolving nature of electricity markets to deal with this complexity and a change of emphasis on signals from these markets to affect power system control. Smart grid capabilities will also impact reliable operations, while cyber security issues must be addressed as a culture change that influences all system design, implementation, and maintenance. Lastly, the paper explores significant questions for further research and the need for a simulation environment that supports such investigation and informs deployments to mitigate operational issues as they arise.

  1. Optimization and Control of Electric Power Systems

    SciTech Connect (OSTI)

    Lesieutre, Bernard C.; Molzahn, Daniel K.

    2014-10-17

    The analysis and optimization needs for planning and operation of the electric power system are challenging due to the scale and the form of model representations. The connected network spans the continent and the mathematical models are inherently nonlinear. Traditionally, computational limits have necessitated the use of very simplified models for grid analysis, and this has resulted in either less secure operation, or less efficient operation, or both. The research conducted in this project advances techniques for power system optimization problems that will enhance reliable and efficient operation. The results of this work appear in numerous publications and address different application problems include optimal power flow (OPF), unit commitment, demand response, reliability margins, planning, transmission expansion, as well as general tools and algorithms.

  2. OTEC power system development and environmental impacts

    SciTech Connect (OSTI)

    Sather, N.F.

    1980-02-20

    Ocean Thermal Energy Conversion (OTEC) is a proven solar energy technology with enormous potential as a supplier of electric power. However, before this potential can be realized there must be significant reductions in OTEC plant investment costs estimated for state-of-the-art designs. A comprehensive survey of the opportunities for reducing costs of the heat exchangers and other components of the power system of closed-cycle OTEC plants is given. These cost-reducing inventives are strongly dependent on the extent to which the environmental impacts of OTEC plants will have to be controlled. The environmental concerns associated with the deployment of OTEC plants are reviewed, and approaches to alleviating these concerns are described. Finally, the key roles of the OTEC-1 component test facility and the OTEC pilot plant planned for a 1984 start up in providing information about the critical power system development and environmental impact problems are summarized.

  3. Fuel cell power system for utility vehicle

    SciTech Connect (OSTI)

    Graham, M.; Barbir, F.; Marken, F.; Nadal, M.

    1996-12-31

    Based on the experience of designing and building the Green Car, a fuel cell/battery hybrid vehicle, and Genesis, a hydrogen/oxygen fuel cell powered transporter, Energy Partners has developed a fuel cell power system for propulsion of an off-road utility vehicle. A 10 kW hydrogen/air fuel cell stack has been developed as a prototype for future mass production. The main features of this stack are discussed in this paper. Design considerations and selection criteria for the main components of the vehicular fuel cell system, such as traction motor, air compressor and compressor motor, hydrogen storage and delivery, water and heat management, power conditioning, and control and monitoring subsystem are discussed in detail.

  4. Wind Farm Power System Model Development: Preprint

    SciTech Connect (OSTI)

    Muljadi, E.; Butterfield, C. P.

    2004-07-01

    In some areas, wind power has reached a level where it begins to impact grid operation and the stability of local utilities. In this paper, the model development for a large wind farm will be presented. Wind farm dynamic behavior and contribution to stability during transmission system faults will be examined.

  5. System Study: Emergency Power System 1998–2013

    SciTech Connect (OSTI)

    Schroeder, John Alton

    2015-02-01

    This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2013 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10-year period while yearly estimates for system unreliability are provided for the entire active period. No statistically significant trends were identified in the EPS results.

  6. EA-98-A Western Systems Power Pool | Department of Energy

    Energy Savers [EERE]

    energy to Canada PDF icon EA-98-A Western Systems Power Pool More Documents & Publications EA-364 Noble Americas Gas & Power Corporation EA-098 Western Systems Power Pool EA-98-I...

  7. Dish/Engine System Concentrating Solar Power Basics | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DishEngine System Concentrating Solar Power Basics DishEngine System Concentrating Solar Power Basics August 20, 2013 - 5:02pm Addthis Illustration of a dishengine power plant. ...

  8. Energy storage for hybrid remote power systems

    SciTech Connect (OSTI)

    Isherwood, W., LLNL

    1998-03-01

    Energy storage can be a cost-effective component of hybrid remote power systems. Storage serves the special role of taking advantage of intermittent renewable power sources. Traditionally this role has been played by lead-acid batteries, which have high life-cycle costs and pose special disposal problems. Hydrogen or zinc-air storage technologies can reduce life-cycle costs and environmental impacts. Using projected data for advanced energy storage technologies, LLNL ran an optimization for a hypothetical Arctic community with a reasonable wind resource (average wind speed 8 m/s). These simulations showed the life-cycle annualized cost of the total energy system (electric plus space heating) might be reduced by nearly 40% simply by adding wind power to the diesel system. An additional 20 to 40% of the wind-diesel cost might be saved by adding hydrogen storage or zinc-air fuel cells to the system. Hydrogen produced by electrolysis of water using intermittent, renewable power provides inexpensive long-term energy storage. Conversion back to electricity with fuel cells can be accomplished with available technology. The advantages of a hydrogen electrolysis/fuel cell system include low life-cycle costs for long term storage, no emissions of concern, quiet operation, high reliability with low maintenance, and flexibility to use hydrogen as a direct fuel (heating, transportation). Disadvantages include high capital costs, relatively low electrical turn-around efficiency, and lack of operating experience in utility settings. Zinc-air fuel cells can lower capital and life-cycle costs compared to hydrogen, with most of the same advantages. Like hydrogen systems, zinc-air technology promises a closed system for long-term storage of energy from intermittent sources. The turn around efficiency is expected to exceed 60%, while use of waste heat can potentially increase overall energy efficiency to over 80%.

  9. Federal Emergency Management Information System (FEMIS) system administration guide, version 1.4.5

    SciTech Connect (OSTI)

    Arp, J.A.; Burnett, R.A.; Carter, R.J.

    1998-06-26

    The Federal Emergency Management Information Systems (FEMIS) is an emergency management planning and response tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide provides information necessary for the system administrator to maintain the FEMIS system. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via a Wide Area Network (WAN). Thus, FEMIS is an integrated software product that resides on client/server computer architecture. The main body of FEMIS software, referred to as the FEMIS Application Software, resides on the PC client(s) and is directly accessible to emergency management personnel. The remainder of the FEMIS software, referred to as the FEMIS Support Software, resides on the UNIX server. The Support Software provides the communication, data distribution, and notification functionality necessary to operate FEMIS in a networked, client/server environment. The UNIX server provides an Oracle relational database management system (RDBMS) services, ARC/INFO GIS (optional) capabilities, and basic file management services. PNNL developed utilities that reside on the server include the Notification Service, the Command Service that executes the evacuation model, and AutoRecovery. To operate FEMIS, the Application Software must have access to a site specific FEMIS emergency management database. Data that pertains to an individual EOC`s jurisdiction is stored on the EOC`s local server. Information that needs to be accessible to all EOCs is automatically distributed by the FEMIS

  10. Polk power station syngas cooling system

    SciTech Connect (OSTI)

    Jenkins, S.D.

    1995-01-01

    Tampa Electric Company (TEC) is in the site development and construction phase of the new Polk Power Station Unit No. 1. This will be the first unit at a new site and will use Integrated Gasification Combined Cycle (IGCC) Technology. The unit will utilize Texaco`s oxygen-blown, entrained-flow coal gasification, along with combined cycle power generation, to produce nominal 260MW. Integral to the gasification process is the syngas cooling system. The design, integration, fabrication, transportation, and erection of this equipment have provided and continue to provide major challenges for this project.

  11. Solar-powered turbocompressor heat pump system

    DOE Patents [OSTI]

    Landerman, A.M.; Biancardi, F.R.; Melikian, G.; Meader, M.D.; Kepler, C.E.; Anderson, T.J.; Sitler, J.W.

    1982-08-12

    The turbocompressor comprises a power turbine and a compressor turbine having respective rotors and on a common shaft, rotatably supported by bearings. A first working fluid is supplied by a power loop and is expanded in the turbine. A second working fluid is compressed in the turbine and is circulated in a heat pump loop. A lubricant is mixed with the second working fluid but is excluded from the first working fluid. The bearings are cooled and lubricated by a system which circulates the second working fluid and the intermixed lubricant through the bearings. Such system includes a pump, a thermostatic expansion valve for expanding the working fluid into the space between the bearings, and a return conduit system for withdrawing the expanded working fluid after it passes through the bearings and for returning the working fluid to the evaporator. A shaft seal excludes the lubricant from the power turbine. The power loop includes a float operable by liquid working fluid in the condenser for controlling a recirculation valve so as to maintain a minimum liquid level in the condenser, while causing a feed pump to pump most of the working fluid into the vapor generator. The heat pump compressor loop includes a float in the condenser for operating and expansion valve to maintain a minimum liquid working fluid level in the condenser while causing most of the working fluid to be expanded into the evaporator.

  12. High Power UV LED Industrial Curing Systems

    SciTech Connect (OSTI)

    Karlicek, Robert, F., Jr; Sargent, Robert

    2012-05-14

    UV curing is a green technology that is largely underutilized because UV radiation sources like Hg Lamps are unreliable and difficult to use. High Power UV LEDs are now efficient enough to replace Hg Lamps, and offer significantly improved performance relative to Hg Lamps. In this study, a modular, scalable high power UV LED curing system was designed and tested, performing well in industrial coating evaluations. In order to achieve mechanical form factors similar to commercial Hg Lamp systems, a new patent pending design was employed enabling high irradiance at long working distances. While high power UV LEDs are currently only available at longer UVA wavelengths, rapid progress on UVC LEDs and the development of new formulations designed specifically for use with UV LED sources will converge to drive more rapid adoption of UV curing technology. An assessment of the environmental impact of replacing Hg Lamp systems with UV LED systems was performed. Since UV curing is used in only a small portion of the industrial printing, painting and coating markets, the ease of use of UV LED systems should increase the use of UV curing technology. Even a small penetration of the significant number of industrial applications still using oven curing and drying will lead to significant reductions in energy consumption and reductions in the emission of green house gases and solvent emissions.

  13. Solid oxide fuel cell power system development

    SciTech Connect (OSTI)

    Kerr, Rick; Wall, Mark; Sullivan, Neal

    2015-06-26

    This report summarizes the progress made during this contractual period in achieving the goal of developing the solid oxide fuel cell (SOFC) cell and stack technology to be suitable for use in highly-efficient, economically-competitive, commercially deployed electrical power systems. Progress was made in further understanding cell and stack degradation mechanisms in order to increase stack reliability toward achieving a 4+ year lifetime, in cost reduction developments to meet the SECA stack cost target of $175/kW (in 2007 dollars), and in operating the SOFC technology in a multi-stack system in a real-world environment to understand the requirements for reliably designing and operating a large, stationary power system.

  14. Distribution of Wind Power Forecasting Errors from Operational Systems (Presentation)

    SciTech Connect (OSTI)

    Hodge, B. M.; Ela, E.; Milligan, M.

    2011-10-01

    This presentation offers new data and statistical analysis of wind power forecasting errors in operational systems.

  15. Dual power, constant speed electric motor system

    DOE Patents [OSTI]

    Kirschbaum, H.S.

    1984-07-31

    A dual capacity permanent split capacitor electric motor system is provided with a stator having main and auxiliary windings. The main stator winding includes two winding sections which are connected in parallel with each other and across a pair of line terminals while the auxiliary winding is connected in series with a capacitor to form a circuit branch which is connected between the line terminals for operation at a first output power level. Switching means are provided to reconnect the main stator winding sections in series with each other and in series with a second capacitor to form a circuit branch which is connected between the line terminals while the stator auxiliary winding is connected directly between the line terminals for operation at a second output power level. Automatic rotation reversal occurs when the motor switches from the first to the second output power level. 6 figs.

  16. Dual power, constant speed electric motor system

    DOE Patents [OSTI]

    Kirschbaum, Herbert S.

    1984-01-01

    A dual capacity permanent split capacitor electric motor system is provided with a stator having main and auxiliary windings. The main stator winding includes two winding sections which are connected in parallel with each other and across a pair of line terminals while the auxiliary winding is connected in series with a capacitor to form a circuit branch which is connected between the line terminals for operation at a first output power level. Switching means are provided to reconnect the main stator winding sections in series with each other and in series with a second capacitor to form a circuit branch which is connected between the line terminals while the stator auxiliary winding is connected directly between the line terminals for operation at a second output power level. Automatic rotation reversal occurs when the motor switches from the first to the second output power level.

  17. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    SciTech Connect (OSTI)

    Reddoch, T.W.; Markel, L.C.

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  18. Power Systems of the Future: A 21st Century Power Partnership Thought Leadership Report (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2015-01-01

    Powerful trends in technology, policy environments, financing, and business models are driving change in power sectors globally. In light of these trends, the question is no longer whether power systems will be transformed, but rather how these transformations will occur. Power Systems of the Future, a thought leadership report from the 21st Century Power Partnership, explores these pathways explores actions that policymakers and regulators can take to encourage desired power system outcomes.

  19. Power Tower System Concentrating Solar Power Basics | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The cool heat-transfer fluid exiting the turbine flows into a steam condenser to be cooled and sent back up the tower to the receiver. In power tower concentrating solar power ...

  20. Southwestern Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    About this site This Web site is the official Web site of the Southwestern Power Administration. It is part of a Federal computer system used to accomplish Federal functions and is ...

  1. Test report : Princeton power systems prototype energy storage system.

    SciTech Connect (OSTI)

    Rose, David Martin; Schenkman, Benjamin L.; Borneo, Daniel R.

    2013-08-01

    The Department of Energy Office of Electricity (DOE/OE), Sandia National Laboratory (SNL) and the Base Camp Integration Lab (BCIL) partnered together to incorporate an energy storage system into a microgrid configured Forward Operating Base to reduce the fossil fuel consumption and to ultimately save lives. Energy storage vendors will be sending their systems to SNL Energy Storage Test Pad (ESTP) for functional testing and then to the BCIL for performance evaluation. The technologies that will be tested are electro-chemical energy storage systems comprised of lead acid, lithium-ion or zinc-bromide. Princeton Power Systems has developed an energy storage system that utilizes lithium ion phosphate batteries to save fuel on a military microgrid. This report contains the testing results and some limited analysis of performance of the Princeton Power Systems Prototype Energy Storage System.

  2. Advanced Supercritical Carbon Dioxide Power Cycle Configurations for Use in Concentrating Solar Power Systems: Preprint

    SciTech Connect (OSTI)

    Ma, Z.; Turchi, C. S.

    2011-03-01

    The research will characterize and evaluate advanced S-CO2 Brayton cycle power generation with a modular power tower CSP system.

  3. Impact of Wind Power Plants on Voltage and Transient Stability of Power Systems

    SciTech Connect (OSTI)

    Muljadi, E.; Nguyen, Tony B.; Pai, M. A.

    2008-09-30

    A standard three-machine, nine-bus wind power system is studied and augmented by a radially connected wind power plant that contains 22 wind turbine generators.

  4. SunPower Corporation Systems formerly PowerLight | Open Energy...

    Open Energy Info (EERE)

    navigation, search Name: SunPower Corporation, Systems (formerly PowerLight) Place: Berkeley, California Zip: 94702 Sector: Efficiency, Services, Solar Product: US-based...

  5. Seismic Retrofit for Electric Power Systems

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Romero, Natalia; Nozick, Linda K.; Dobson, Ian; Xu, Ningxiong; Jones, Dean A.

    2015-05-01

    Our paper develops a two-stage stochastic program and solution procedure to optimize the selection of seismic retrofit strategies to increase the resilience of electric power systems against earthquake hazards. The model explicitly considers the range of earthquake events that are possible and, for each, an approximation of the distribution of damage experienced. Furthermore, this is important because electric power systems are spatially distributed and so their performance is driven by the distribution of component damage. We also test this solution procedure against the nonlinear integer solver in LINGO 13 and apply the formulation and solution strategy to the Eastern Interconnection,more » where seismic hazard stems from the New Madrid seismic zone.« less

  6. Integrated control of next generation power system

    SciTech Connect (OSTI)

    None, None

    2010-02-28

    The multi-agent system (MAS) approach has been applied with promising results for enhancing an electric power distribution circuit, such as the Circuit of the Future as developed by Southern California Edison. These next generation power system results include better ability to reconfigure the circuit as well as the increased capability to improve the protection and enhance the reliability of the circuit. There were four main tasks in this project. The specific results for each of these four tasks and their related topics are presented in main sections of this report. Also, there were seven deliverables for this project. The main conclusions for these deliverables are summarized in the identified subtask section of this report. The specific details for each of these deliverables are included in the “Project Deliverables” section at the end of this Final Report.

  7. Distributed Power Electronics for PV Systems (Presentation)

    SciTech Connect (OSTI)

    Deline, C.

    2011-12-01

    An overview of the benefits and applications of microinverters and DC power optimizers in residential systems. Some conclusions from this report are: (1) The impact of shade is greater than just the area of shade; (2) Additional mismatch losses include panel orientation, panel distribution, inverter voltage window, soiling; (3) Per-module devices can help increase performance, 4-12% or more depending on the system; (4) Value-added benefits (safety, monitoring, reduced design constraints) are helping their adoption; and (5) The residential market is growing rapidly. Efficiency increases, cost reductions are improving market acceptance. Panel integration will further reduce price and installation cost. Reliability remains an unknown.

  8. DOE Technical Targets for Fuel Cell Systems for Portable Power...

    Energy Savers [EERE]

    Portable Power and Auxiliary Power Applications DOE Technical Targets for Fuel Cell Systems ... specific energy and energy density. d Cost includes material and labor costs ...

  9. NREL Names Santiago Grijalva Director for Power Systems Engineering...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    existing electric power system and to provide improved management strategies for demand response and transportation electrification. "Santiago is a pioneer in distributed power ...

  10. Supervisory Electrical Engineer- Supervisory Power System Real Time Electrical Engineer

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Power System Operations Operations Engineering, (J4200) 5555...

  11. China Wind Systems formerly Green Power Malex | Open Energy Informatio...

    Open Energy Info (EERE)

    formerly Green Power Malex Jump to: navigation, search Name: China Wind Systems (formerly Green PowerMalex) Place: Wuxi, Jiangsu Province, China Sector: Wind energy Product:...

  12. Energy Department Nuclear Systems Are Powering Mars Rover | Department...

    Energy Savers [EERE]

    Nuclear power is uniquely suited to provide these missions with safe and reliable ... energy systems developed by DOE to power missions such as the Apollo and Viking missions; ...

  13. Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers

    Office of Energy Efficiency and Renewable Energy (EERE)

    This step-by-step manual guides readers through the process of implementing a fuel cell stationary power project. The guide outlines the basics of fuel cell technology and describes how fuel cell projects can meet on-site energy service needs as well as support strategic agency objectives and sustainability requirements. This guide will help agencies decide whether a fuel cell project may be feasible and economically viable at their site. The guide then presents a four-part process for implementing a fuel cell project.

  14. Test report light duty utility arm power distribution system (PDS)

    SciTech Connect (OSTI)

    Clark, D.A.

    1996-03-04

    The Light Duty Utility Arm (LDUA) Power Distribution System has completed vendor and post-delivery acceptance testing. The Power Distribution System has been found to be acceptable and is now ready for integration with the overall LDUA system.

  15. Project Profile: Brayton Solar Power Conversion System | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Solar Power Conversion System Project Profile: Brayton Solar Power Conversion System Brayton Energy logo Brayton Energy, under the CSP R&D FOA, is looking to demonstrate the viability and economics of a new concentrating solar thermal power conversion system. Approach An image of a 320-square-meter dish with Brayton Energy's power conversion module and a 200-kWe turboalternator and solar receiver. The project focuses on designing and testing the power conversion system and

  16. 2013 Federal Energy and Water Management Award Winner Naval Sea Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Command | Department of Energy Naval Sea Systems Command 2013 Federal Energy and Water Management Award Winner Naval Sea Systems Command fewm13_nswcphiladelphia_highres.pdf (5.43 MB) fewm13_nswcphiladelphia.pdf (1.75 MB) More Documents & Publications CX-005670: Categorical Exclusion Determination U.S. Navy Marine Diesel Engines and the Environment - Part 1 EIS-0259: Record of Decision

  17. Power Systems Life Cycle Analysis Tool (Power L-CAT).

    SciTech Connect (OSTI)

    Andruski, Joel; Drennen, Thomas E.

    2011-01-01

    The Power Systems L-CAT is a high-level dynamic model that calculates levelized production costs and tracks environmental performance for a range of electricity generation technologies: natural gas combined cycle (using either imported (LNGCC) or domestic natural gas (NGCC)), integrated gasification combined cycle (IGCC), supercritical pulverized coal (SCPC), existing pulverized coal (EXPC), nuclear, and wind. All of the fossil fuel technologies also include an option for including carbon capture and sequestration technologies (CCS). The model allows for quick sensitivity analysis on key technical and financial assumptions, such as: capital, O&M, and fuel costs; interest rates; construction time; heat rates; taxes; depreciation; and capacity factors. The fossil fuel options are based on detailed life cycle analysis reports conducted by the National Energy Technology Laboratory (NETL). For each of these technologies, NETL's detailed LCAs include consideration of five stages associated with energy production: raw material acquisition (RMA), raw material transport (RMT), energy conversion facility (ECF), product transportation and distribution (PT&D), and end user electricity consumption. The goal of the NETL studies is to compare existing and future fossil fuel technology options using a cradle-to-grave analysis. The NETL reports consider constant dollar levelized cost of delivered electricity, total plant costs, greenhouse gas emissions, criteria air pollutants, mercury (Hg) and ammonia (NH3) emissions, water withdrawal and consumption, and land use (acreage).

  18. System Study: Emergency Power System 1998–2012

    SciTech Connect (OSTI)

    T. E. Wierman

    2013-10-01

    This report presents an unreliability evaluation of the emergency power system (EPS) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2012 for selected components were obtained from the Equipment Performance and Information Exchange (EPIX). The unreliability results are trended for the most recent 10 year period while yearly estimates for system unreliability are provided for the entire active period. A statistically significant increasing trend was identified for unreliability (8 hour model) as a function of fiscal year. No statistically significant decreasing trend was identified in the EPS results.

  19. Excise Tax Exemption for Solar or Wind Powered Systems

    Broader source: Energy.gov [DOE]

    Massachusetts law exempts any "solar or wind powered climatic control unit and any solar or wind powered water heating unit or any other type unit or system powered thereby," that qualifies for the...

  20. Fuel processor for fuel cell power system

    DOE Patents [OSTI]

    Vanderborgh, Nicholas E.; Springer, Thomas E.; Huff, James R.

    1987-01-01

    A catalytic organic fuel processing apparatus, which can be used in a fuel cell power system, contains within a housing a catalyst chamber, a variable speed fan, and a combustion chamber. Vaporized organic fuel is circulated by the fan past the combustion chamber with which it is in indirect heat exchange relationship. The heated vaporized organic fuel enters a catalyst bed where it is converted into a desired product such as hydrogen needed to power the fuel cell. During periods of high demand, air is injected upstream of the combustion chamber and organic fuel injection means to burn with some of the organic fuel on the outside of the combustion chamber, and thus be in direct heat exchange relation with the organic fuel going into the catalyst bed.

  1. Electromagnetic pulse research on electric power systems: Program summary and recommendations. Power Systems Technology Program

    SciTech Connect (OSTI)

    Barnes, P.R.; McConnell, B.W.; Van Dyke, J.W.; Tesche, F.M.; Vance, E.F.

    1993-01-01

    A single nuclear detonation several hundred kilometers above the central United States will subject much of the nation to a high-altitude electromagnetic pulse (BENT). This pulse consists of an intense steep-front, short-duration transient electromagnetic field, followed by a geomagnetic disturbance with tens of seconds duration. This latter environment is referred to as the magnetohydrodynamic electromagnetic pulse (NMENT). Both the early-time transient and the geomagnetic disturbance could impact the operation of the nation`s power systems. Since 1983, the US Department of Energy has been actively pursuing a research program to assess the potential impacts of one or more BENT events on the nation`s electric energy supply. This report summarizes the results of that program and provides recommendations for enhancing power system reliability under HENT conditions. A nominal HENP environment suitable for assessing geographically large systems was developed during the program and is briefly described in this report. This environment was used to provide a realistic indication of BEMP impacts on electric power systems. It was found that a single high-altitude burst, which could significantly disturb the geomagnetic field, may cause the interconnected power network to break up into utility islands with massive power failures in some areas. However, permanent damage would be isolated, and restoration should be possible within a few hours. Multiple bursts would likely increase the blackout areas, component failures, and restoration time. However, a long-term blackout of many months is unlikely because major power system components, such as transformers, are not likely to be damaged by the nominal HEND environment. Moreover, power system reliability, under both HENT and normal operating conditions, can be enhanced by simple, and often low cost, modifications to current utility practices.

  2. INTEGRATED POWER GENERATION SYSTEMS FOR COAL MINE WASTE METHANE UTILIZATION

    SciTech Connect (OSTI)

    Peet M. Soot; Dale R. Jesse; Michael E. Smith

    2005-08-01

    An integrated system to utilize the waste coal mine methane (CMM) at the Federal No. 2 Coal Mine in West Virginia was designed and built. The system includes power generation, using internal combustion engines, along with gas processing equipment to upgrade sub-quality waste methane to pipeline quality standards. The power generation has a nominal capacity of 1,200 kw and the gas processing system can treat about 1 million cubic feet per day (1 MMCFD) of gas. The gas processing is based on the Northwest Fuel Development, Inc. (NW Fuel) proprietary continuous pressure swing adsorption (CPSA) process that can remove nitrogen from CMM streams. The two major components of the integrated system are synergistic. The byproduct gas stream from the gas processing equipment can be used as fuel for the power generating equipment. In return, the power generating equipment provides the nominal power requirements of the gas processing equipment. This Phase III effort followed Phase I, which was comprised of a feasibility study for the project, and Phase II, where the final design for the commercial-scale demonstration was completed. The fact that NW Fuel is desirous of continuing to operate the equipment on a commercial basis provides the validation for having advanced the project through all of these phases. The limitation experienced by the project during Phase III was that the CMM available to operate the CPSA system on a commercial basis was not of sufficiently high quality. NW Fuel's CPSA process is limited in its applicability, requiring a relatively high quality of gas as the feed to the process. The CPSA process was demonstrated during Phase III for a limited time, during which the processing capabilities met the expected results, but the process was never capable of providing pipeline quality gas from the available low quality CMM. The NW Fuel CPSA process is a low-cost ''polishing unit'' capable of removing a few percent nitrogen. It was never intended to process CMM

  3. Low Cost High Concentration PV Systems for Utility Power Generation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Low Cost High Concentration PV Systems for Utility Power Generation An overview of the Low Cost High Concentration PV Systems for Utility Power Generation project to transition Amonix's concentrating photovoltaic (PV) systems from low-volume to high-volume production. Low Cost High Concentration PV Systems for Utility Power Generation (972.55 KB) More Documents & Publications Solar America Initiative Low Cost High Concentration PV Systems for Utility Power

  4. An advanced power distribution automation model system

    SciTech Connect (OSTI)

    Niwa, Shigeharu; Kanoi, Minoru; Nishijima, Kazuo; Hayami, Mitsuo

    1995-12-31

    An advanced power distribution automation (APDA) model system has been developed on the present basis of the automated distribution systems in Japan, which have been used for remote switching operations and for urgent supply restorations during faults. The increased use of electronic apparatuses sensitive to supply interruption requires very high supply reliability, and the final developed system is expected to be useful for this purpose. The developed model system adopts pole circuit breakers and remote termination units connected through 64kbps optical fibers to the computer of the automated system in the control center. Immediate switching operations for supply restorations during faults are possible through the restoration procedures, prepared beforehand, by the computer and by fast telecommunications using optical fibers. So, protection by the feeder circuit breaker in the substation can be avoided, which would otherwise cause the blackout of the whole distribution line. The test results show the effectiveness of model the system: successful fault locations and reconfiguration for supply restoration including separation of the fault sections (without blackout for the ground faults and with a short period (within 1 s) of blackout for the short-circuit faults).

  5. Instantaneous Reactive Power Theory for Three-phase Power Systems

    Office of Scientific and Technical Information (OSTI)

    ... The instantaneous active power of a three-phase circuit, p , can be given by OF THIS ... Fig. 1. Three-phase circuit structure. b' i Fig. 2. Three-phase coordinates. p v - i , ...

  6. DOE uniform reporting system for Federal assistance (grants and cooperative agreements): guidelines

    SciTech Connect (OSTI)

    Not Available

    1981-04-01

    These guidelines establish a uniform reporting system (URS) for grants and cooperative agreements. The purpose is to simplify reporting requirements, standardize reporting, and ensure that no assistance recipient submits more reports than needed to achieve accountability for public funds. This system replaces the many reporting procedures previously imposed by DOE component organizations. Uniform terminology and data elements will minimize ambiguity of meaning and intent. A glossary of terms is provided. A checklist is used to identify all reporting requirements at the time of award. The recipient is encouraged to discuss the requirements before the time of award in order to ensure that they are appropriate. The Guidelines describe planning forms which can be included in the Federal assistance application or proposal to present the planned approach and desired results. Flexibility has been built into the system to ensure that the information requested is relative to the activity performed. A recipient of Federal assistance submits information only once in each reporting period. The reporting system provides recipients with a formal method for identifying problems, including those originated by the Federal government. For purposes of illustration, a hypothetical project - partially funded by DOE under a cooperative agreement - using all the Program Management forms is presented in Part II, Program Management. Part III, Technical Information uses a research grant to illustrate Technical Reporting. Appendix B provides a complete example of the reporting requirements on a research grant.

  7. Status Report on Power System Transformation: A 21st Century Power Partnership Report

    SciTech Connect (OSTI)

    Miller, Mackay; Martinot, Eric; Cox, Sadie; Speer, Bethany; Zinaman, Owen; Booth, Sam; Zissler, Romain; Cochran, Jaquelin; Soonee, S. K.; Audinet, Pierre; Munuera, Luis; Arent, Doug

    2015-05-27

    This report has three primary goals: (1) to articulate the concept of power system transformation; (2) to explore the current global landscape of ‘innovations’ that constitute power system transformation and provide evidence of how these innovations are emerging; and (3) to suggest an analytical framework for assessing the status of power system transformation on an on-going basis.

  8. Federal policies to promote the widespread utilization of photovoltaic systems. Supplement: review and critique

    SciTech Connect (OSTI)

    Smith, J.L.

    1980-04-15

    This document is intended as a supplement to the two-volume report entitled Federal Policies to Promote the Widespread Utilization of Photovoltaic Systems that was submitted to Congress by the Department of Energy in February and April of 1980. This supplement contains review comments prepared by knowledgeable experts who reviewed early drafts of the Congressional report. Responses to the review comments by the Jet Propulsion Laboratory, preparer of the Congressional report, are also included in this supplement. The Congressional report, mandated in the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (P.L. 95-590), discusses various issues related to promoting the deployment of photovoltaic systems through the Federal Photovoltaic Program. Various program strategies and funding levels are examined.

  9. Working Group Report on - Space Nuclear Power Systems and Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D Working Group Report on - Space Nuclear Power Systems and Nuclear Waste Technology R&D "Even ...

  10. Advancing State-of-the-Art Concentrating Solar Power Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Advancing State-of-the-Art Concentrating Solar Power Systems Advancing State-of-the-Art Concentrating Solar Power Systems April 15, 2013 - 12:00am Addthis Brayton Energy's...

  11. Researchers test novel power system for space travel

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power system for space travel Researchers test novel power system for space travel The ... "The heat pipe and Stirling engine used in this test are meant to represent one module ...

  12. Utility-Scale Power Tower Solar Systems: Performance Acceptance...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Utility-Scale Power Tower Solar Systems: Performance Acceptance Test Guidelines David ... DE-AC36-08GO28308 Utility-Scale Power Tower Solar Systems: Performance Acceptance Test ...

  13. Whitestone Power & Communications (TRL 1 2 3 System) - Whitestone...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vortex Hydro Energy (TRL 5 6 System) - Advanced Integration of Power Take-Off in VIVACE Water Power Program Peer Review Meeting Agenda Sunlight Photonics (TRL 4 System) - Tidal ...

  14. Solid Oxide Fuel Cell and Power System Development at PNNL

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solid Oxide Fuel Cell and Power Solid Oxide Fuel Cell and Power S t D l t t PNNL S t D l t t PNNL System Development at PNNL System Development at PNNL Larry Chick Energy Materials ...

  15. Deep Well #4 Backup Power Systems Project Closeout Report

    SciTech Connect (OSTI)

    Jeremy Westwood

    2010-04-01

    The project scope was to install a diesel generated power source to deep well 4 in addition to the existing commercial power source. The diesel power source and its fuel supply system shall be seismically qualified to withstand a Performance Category 4 (PC-4) seismic event. This diesel power source will permit the deep well to operate during a loss of commercial power. System design will incorporate the ability to select and transfer power between the new diesel power source and commercial power sources for the the deep well motor and TRA-672 building loads.

  16. Federal Awardee Performance and Integrity Information System (FAPIIS) Trailer (Civilian Agency Acquisition Letter 2010-05)

    Broader source: Energy.gov [DOE]

    The Civilian Agency Acquisition Letter 2010-05 encourages the acquisition community to view the FAPIIS trailer for an overview of the FAPIIS requirement. The website to access the FAPIIS trailer is www.fai.gov/FAPIIS/trailer/module.htm. Policy Flash 2010-56 issued Acquisition Guide Chapter 42.16, Reporting Other Contractor Information into the Federal Awardee Performance and Integrity Information System which provides the Department of Energy internal procedures.

  17. Simulation of a Wireless Power Transfer System for Electric Vehicles with Power Factor Correction

    SciTech Connect (OSTI)

    Pickelsimer, Michael C; Tolbert, Leon M; Ozpineci, Burak; Miller, John M

    2012-01-01

    Wireless power transfer has been a popular topic of recent research. Most research has been done to address the limitations of coil-to-coil efficiency. However, little has been done to address the problem associated with the low input power factor with which the systems operate. This paper details the steps taken to analyze a wireless power transfer system from the view of the power grid under a variety of loading conditions with and without power factor correction.

  18. Hybrid Power System Simulation Model | Open Energy Information

    Open Energy Info (EERE)

    URI: cleanenergysolutions.orgcontenthybrid-power-system-simulation-model, Language: English Policies: Deployment Programs DeploymentPrograms: Technical Assistance This...

  19. Low Cost High Concentration PV Systems for Utility Power Generation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency Concentrating Photovoltaic Power System,Reaching Grid Parity ... for Residential and Commercial Photovoltaic Energy Generation,A Value Chain ...

  20. Future Power Systems 20: The Smart Enterprise, its Objective and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Forecasting. | Department of Energy 0: The Smart Enterprise, its Objective and Forecasting. Future Power Systems 20: The Smart Enterprise, its Objective and Forecasting. Future Power Systems 20: The Smart Enterprise, its Objective and Forecasting. Future Power Systems 20: The Smart Enterprise, its Objective and Forecasting. (297.93 KB) More Documents & Publications Future Power Systems 21 - The Smart Customer Smart Grid R&D Multi-Year Program Plan (2010-2014) - September 2011 Update

  1. SunCatcher Power System Unveiled | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SunCatcher Power System Unveiled SunCatcher Power System Unveiled SunCatcher Power System Unveiled This photograph features the four newly designed solar power collection dishes at Sandia National Laboratories' National Solar Thermal Test Facility (NSTTF) that Stirling Energy Systems (SES) and Tessera Solar unveiled in 2009. Called SunCatchers(tm), the new dishes have a refined design that will be used in commercial-scale deployments of the units beginning in 2010. Sandia's concentrating

  2. Chapter 3 - Enabling Modernization of the Electric Power System |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Chapter 3 - Enabling Modernization of the Electric Power System Chapter 3 - Enabling Modernization of the Electric Power System Chapter 3 - Enabling Modernization of the Electric Power System The electric power system is facing increasing stress due to fundamental changes in both supply and demand technologies. On the supply side, there is a shift from large synchronous generators to lighter-weight generators (e.g., gas-fired turbines) and variable resources

  3. Essential Power Systems Workshop - OEM Perspective

    SciTech Connect (OSTI)

    Bill Gouse

    2001-12-12

    general. In addition to the survey, we believe data loggers and focus groups will be necessary to collect the idling duration and location data necessary to compare auxiliary power units to truck stop electrification. Focus groups are recommended to better understand the driver response to APUs and electrification. The appearance and perception of the new systems will need further clarification, which could be accomplished with a demonstration for truck drivers.

  4. RADIOISOTOPE POWER SYSTEM CAPABILITIES AT THE IDAHO NATIONAL LABORATORY (INL)

    SciTech Connect (OSTI)

    Kelly Lively; Stephen Johnson; Eric Clarke

    2014-07-01

    --Idaho National Laboratory’s, Space Nuclear Systems and Technology Division established the resources, equipment and facilities required to provide nuclear-fueled, Radioisotope Power Systems (RPS) to Department of Energy (DOE) Customers. RPSs are designed to convert the heat generated by decay of iridium clad, 238PuO2 fuel pellets into electricity that is used to power missions in remote, harsh environments. Utilization of nuclear fuel requires adherence to governing regulations and the INL provides unique capabilities to safely fuel, test, store, transport and integrate RPSs to supply power—supporting mission needs. Nuclear capabilities encompass RPS fueling, testing, handling, storing, transporting RPS nationally, and space vehicle integration. Activities are performed at the INL and in remote locations such as John F. Kennedy Space Center and Cape Canaveral Air Station to support space missions. This paper will focus on the facility and equipment capabilities primarily offered at the INL, Material and Fuel Complex located in a security-protected, federally owned, industrial area on the remote desert site west of Idaho Falls, ID. Nuclear and non-nuclear facilities house equipment needed to perform required activities such as general purpose heat source (GPHS) module pre-assembly and module assembly using nuclear fuel; RPS receipt and baseline electrical testing, fueling, vibration testing to simulate the launch environment, mass properties testing to measure the mass and compute the moment of inertia, electro-magnetic characterizing to determine potential consequences to the operation of vehicle or scientific instrumentation, and thermal vacuum testing to verify RPS power performance in the vacuum and cold temperatures of space.

  5. Flexibility in 21st Century Power Systems (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-10-01

    Flexibility of operation--the ability of a power system to respond to change in demand and supply--is a characteristic of all power systems. Flexibility is especially prized in twenty-first century power systems, with higher levels of grid-connected variable renewable energy (primarily, wind and solar). Sources of flexibility exist--and can be enhanced--across all of the physical and institutional elements of the power system, including system operations and markets, demand side resources and storage; generation; and transmission networks. Accessing flexibility requires significant planning to optimize investments and ensure that both short- and long-time power system requirements are met.

  6. Direct current uninterruptible power supply method and system

    DOE Patents [OSTI]

    Sinha, Gautam

    2003-12-02

    A method and system are described for providing a direct current (DC) uninterruptible power supply with the method including, for example: continuously supplying fuel to a turbine; converting mechanical power from the turbine into alternating current (AC) electrical power; converting the AC electrical power to DC power within a predetermined voltage level range; supplying the DC power to a load; and maintaining a DC load voltage within the predetermined voltage level range by adjusting the amount of fuel supplied to the turbine.

  7. Concentrating Solar Power Projects - Palen Solar Electric Generating System

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | Concentrating Solar Power | NREL Palen Solar Electric Generating System This page provides information on the Palen Solar Power Project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. Status Date: April 4, 2013 Project Overview Project Name: Palen Solar Electric Generating System Country: United States Location: Desert Center, California Owner(s): BrightSource Energy (100%) Technology: Power tower Turbine Capacity:

  8. Transforming Power Systems; 21st Century Power Partnership

    SciTech Connect (OSTI)

    2015-05-20

    The 21st Century Power Partnership - a multilateral effort of the Clean Energy Ministerial - serves as a platform for public-private collaboration to advance integrated solutions for the large-scale deployment of renewable energy in combination with deep energy ef?ciency and smart grid solutions.

  9. and Control of Power Systems Using Distributed Synchrophasors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... be offered through the Electrical & Computer Engineering ... program focused on distribution systems, substation ... of Synchrophasors in transmission-level power systems, and ...

  10. A Power Energy Generation Systems Ltd APWR | Open Energy Information

    Open Energy Info (EERE)

    Systems Ltd (APWR) Place: Shenyang, Liaoning Province, China Zip: 110021 Product: Chinese-based provider of power generation systems, acting as the holding company of Liaoning...

  11. Manure digester and power generating system

    SciTech Connect (OSTI)

    Santina, P.F.; Chatterjee, A.K.

    1988-06-14

    A manure digester and power generating system is described comprising: a mixing tank for receiving manure, and for mixing water with the manure to produce a manure slurry of desired consistency; a closed anaerobic digester tank of fixed volume; the mixing tank being separate from and spaced from the digester tank; pumping and conduit means for transferring the contents of the mixing tank to the digester tank; automatic control means, associated with the pumping means, for monitoring and controlling temperature and volume of the contents of the mixing tank before transfer to the digester tank; means for discharging effluent by-products out the outflow end of the digester tank; a gas-fueled engine and a generator coupled to the engine, for generating electrical power; heater means; means for drawing off biogas from the digester tank and for conducting it to the engine as fuel, and wherein the manure slurry is heated sufficiently, prior to introduction into the digester tank and separately from the digester tank, to prevent temperature shock of already digesting slurry in the digester tank when the slurry is introduced into the digester tank.

  12. The Earth System Grid Federation: An Open Infrastructure for Access to Distributed Geo-Spatial Data

    SciTech Connect (OSTI)

    Cinquini, Luca; Crichton, Daniel; Miller, Neill; Mattmann, Chris; Harney, John F; Shipman, Galen M; Wang, Feiyi; Bell, Gavin; Drach, Bob; Ananthakrishnan, Rachana; Pascoe, Stephen; Fiore, Sandro; Schweitzer, Roland; Danvil, Sebastian; Morgan, Mark

    2012-01-01

    The Earth System Grid Federation (ESGF) is a multi-agency, international collaboration that aims at developing the software infrastructure needed to facilitate and empower the study of climate change on a global scale. The ESGF s architecture employs a system of geographically distributed peer nodes, which are independently administered yet united by the adoption of common federation protocols and application programming interfaces (APIs). The cornerstones of its interoperability are the peer-to-peer messaging that is continuously exchanged among all nodes in the federation; a shared architecture and API for search and discovery; and a security infrastructure based on industry standards (OpenID, SSL, GSI and SAML). The ESGF software is developed collaboratively across institutional boundaries and made available to the community as open source. It has now been adopted by multiple Earth science projects and allows access to petabytes of geophysical data, including the entire model output used for the next international assessment report on climate change (IPCC-AR5) and a suite of satellite observations (obs4MIPs) and reanalysis data sets (ANA4MIPs).

  13. The Earth System Grid Federation: An Open Infrastructure for Access to Distributed Geospatial Data

    SciTech Connect (OSTI)

    Ananthakrishnan, Rachana; Bell, Gavin; Cinquini, Luca; Crichton, Daniel; Danvil, Sebastian; Drach, Bob; Fiore, Sandro; Gonzalez, Estanislao; Harney, John F; Mattmann, Chris; Kershaw, Philip; Morgan, Mark; Pascoe, Stephen; Shipman, Galen M; Wang, Feiyi

    2013-01-01

    The Earth System Grid Federation (ESGF) is a multi-agency, international collaboration that aims at developing the software infrastructure needed to facilitate and empower the study of climate change on a global scale. The ESGF s architecture employs a system of geographically distributed peer nodes, which are independently administered yet united by the adoption of common federation protocols and application programming interfaces (APIs). The cornerstones of its interoperability are the peer-to-peer messaging that is continuously exchanged among all nodes in the federation; a shared architecture and API for search and discovery; and a security infrastructure based on industry standards (OpenID, SSL, GSI and SAML). The ESGF software is developed collaboratively across institutional boundaries and made available to the community as open source. It has now been adopted by multiple Earth science projects and allows access to petabytes of geophysical data, including the entire model output used for the next international assessment report on climate change (IPCC-AR5) and a suite of satellite observations (obs4MIPs) and reanalysis data sets (ANA4MIPs).

  14. Prefire identification for pulse-power systems

    DOE Patents [OSTI]

    Longmire, J.L.; Thuot, M.E.; Warren, D.S.

    1982-08-23

    Prefires in a high-power, high-frequency, multi-stage pulse generator are detected by a system having an EMI shielded pulse timing transmitter associated with and tailored to each stage of the pulse generator. Each pulse timing transmitter upon detection of a pulse triggers a laser diode to send an optical signal through a high frequency fiber optic cable to a pulse timing receiver which converts the optical signal to an electrical pulse. The electrical pulses from all pulse timing receivers are fed through an OR circuit to start a time interval measuring device and each electrical pulse is used to stop an individual channel in the measuring device thereby recording the firing sequence of the multi-stage pulse generator.

  15. Prefire identification for pulse power systems

    DOE Patents [OSTI]

    Longmire, Jerry L.; Thuot, Michael E.; Warren, David S.

    1985-01-01

    Prefires in a high-power, high-frequency, multi-stage pulse generator are detected by a system having an EMI shielded pulse timing transmitter associated with and tailored to each stage of the pulse generator. Each pulse timing transmitter upon detection of a pulse triggers a laser diode to send an optical signal through a high frequency fiber optic cable to a pulse timing receiver which converts the optical signal to an electrical pulse. The electrical pulses from all pulse timing receivers are fed through an OR circuit to start a time interval measuring device and each electrical pulse is used to stop an individual channel in the measuring device thereby recording the firing sequence of the multi-stage pulse generator.

  16. Control system and method for a universal power conditioning system

    DOE Patents [OSTI]

    Lai, Jih-Sheng; Park, Sung Yeul; Chen, Chien-Liang

    2014-09-02

    A new current loop control system method is proposed for a single-phase grid-tie power conditioning system that can be used under a standalone or a grid-tie mode. This type of inverter utilizes an inductor-capacitor-inductor (LCL) filter as the interface in between inverter and the utility grid. The first set of inductor-capacitor (LC) can be used in the standalone mode, and the complete LCL can be used for the grid-tie mode. A new admittance compensation technique is proposed for the controller design to avoid low stability margin while maintaining sufficient gain at the fundamental frequency. The proposed current loop controller system and admittance compensation technique have been simulated and tested. Simulation results indicate that without the admittance path compensation, the current loop controller output duty cycle is largely offset by an undesired admittance path. At the initial simulation cycle, the power flow may be erratically fed back to the inverter causing catastrophic failure. With admittance path compensation, the output power shows a steady-state offset that matches the design value. Experimental results show that the inverter is capable of both a standalone and a grid-tie connection mode using the LCL filter configuration.

  17. Improved Concentrating Solar Power Systems - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Solar Thermal Solar Thermal Energy Storage Energy Storage Find More Like This Return to Search Improved Concentrating Solar Power Systems National Renewable Energy Laboratory Contact NREL About This Technology Technology Marketing Summary Concentrating Solar Power (CSP) systems utilize solar energy to drive a thermal power cycle for the generation of electricity. CSP technologies include parabolic trough, linear Fresnel, central receiver or "power tower", and dish/engine systems.

  18. Pool power control in remelting systems

    DOE Patents [OSTI]

    Williamson, Rodney L.; Melgaard, David K.; Beaman, Joseph J.

    2011-12-13

    An apparatus for and method of controlling a remelting furnace comprising adjusting current supplied to an electrode based upon a predetermined pool power reference value and adjusting the electrode drive speed based upon the predetermined pool power reference value.

  19. Federal oversight of alternative bond systems under SMCRA (Surface Mining Control and Reclamation Act)

    SciTech Connect (OSTI)

    Beier, A.E.; McElfish, J.M. Jr.

    1989-01-01

    The 1977 Surface Mining Control and Reclamation Act (SMCRA) requires mine operators to post reclamation bonds before mining begins. The Federal Office of Surface Mining Reclamation and Enforcement (OSMRE) has approved alternative bond systems in seven states. These systems, rather than requiring bond amounts at the full cost of reclamation, require operators to submit only a flat rate, acreage specific bond. Additional reclamation costs should be covered by a supplemental fund composed generally of permit fees, taxes, or penalties. In many cases, alternative bond systems fail to ensure that funds will be available to reclaim coal mined land in the event of operator default, as required by SMCRA. OSMRE needs to take a more active role in oversight of existing state alternative bond systems to ensure that reclamation occurs.

  20. Static reactive power compensators for high-voltage power systems. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-04-01

    A study conducted to summarize the role of static reactive power compensators for high voltage power system applications is described. This information should be useful to the utility system planning engineer in applying static var systems (SVS) to high voltage as (HVAC) systems. The static var system is defined as a form of reactive power compensator. The general need for reactive power compensation in HVAC systems is discussed, and the static var system is compared to other devices utilized to provide reactive power compensation. Examples are presented of applying SVS for specific functions, such as the prevention of voltage collapse. The operating principles of commercially available SVS's are discussed in detail. The perormance and active power loss characteristics of SVS types are compared.

  1. Federal Power Act Amendments of 1995. Introduced in the Senate of the United States, One Hundred Fourth Congress, First Session, April 27, 1995

    SciTech Connect (OSTI)

    1995-12-31

    The report addresses bill S. 737 which is to extend the deadlines under the Federal Power Act applicable to construction of FERC-licensed hydroelectric projects in the States of West Virginia, Kentucky, Washington, Oregon, Arkansas, New Mexico, Alaska, and Hawaii and for other purposes. The background, legislative history and need for the extension is presented. Statements of government officials are included.

  2. Global DC Power System Market Analysis | OpenEI Community

    Open Energy Info (EERE)

    either positive or negative. It can be powered from an AC or DC source. A basic DC power system consists of a transformer, a rectifier, a filter, and a regulator. All these...

  3. Global DC Power System Market Growth | OpenEI Community

    Open Energy Info (EERE)

    either positive or negative. It can be powered from an AC or DC source. A basic DC power system consists of a transformer, a rectifier, a filter, and a regulator. All these...

  4. Global DC Power System Market Space | OpenEI Community

    Open Energy Info (EERE)

    either positive or negative. It can be powered from an AC or DC source. A basic DC power system consists of a transformer, a rectifier, a filter, and a regulator. All these...

  5. The National Carbon Capture Center at the Power Systems Development

    Office of Scientific and Technical Information (OSTI)

    None 01 COAL, LIGNITE, AND PEAT; 20 FOSSIL-FUELED POWER PLANTS; 54 ENVIRONMENTAL SCIENCES The Power Systems Development Facility (PSDF) is a state-of-the-art test center sponsored...

  6. Chapter 3: Enabling Modernization of the Electric Power System

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Enabling Modernization of the Electric Power System September 2015 Quadrennial Technology Review 3 Enabling Modernization of the Electric Power System Issues and RDD&D Opportunities  Fundamental changes in electricity generation and use are requiring the electricity system to perform in ways for which it was not designed-requiring new capabilities and system designs to maintain historical levels of reliability.  American industry and commerce demand affordable, high-quality power

  7. Federal Awardee Performance and Integrity Information System (FAPIIS) – Public Access

    Broader source: Energy.gov [DOE]

    On April 15, 2011, the public side of the Federal Awardee Performance and Integrity Information System (FAPIIS) website was launched. This means that information posted to FAPIIS on and after this date, with the exception of past performance reviews, will be accessible by the public. Public access to information posted to FAPIIS prior to April 15, 2011, will be subject to the Freedom of Information Act (FOIA) process. (See paragraph (b)(3) of 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (JAN 2011)).

  8. Power Systems Operations and Controls | Grid Modernization |...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bulk system operations Distributed system controls and optimization Advanced distribution management systems Microgrid controls and resiliency controls Home energy management ...

  9. Brayton Cycle Baseload Power Tower CSP System

    Office of Energy Efficiency and Renewable Energy (EERE)

    This presentation was delivered at the SunShot Concentrating Solar Power (CSP) Program Review 2013, held April 23–25, 2013 near Phoenix, Arizona.

  10. Princeton Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Zip: 8540 Product: Focused on advanced power conversion technologies -controllers and inverters. Coordinates: 43.85105, -89.129909 Show Map Loading map... "minzoom":false,"map...

  11. Versa Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Divide Road, Suite 101 Place: Littleton, Colorado Zip: 80127 Region: Rockies Area Sector: Hydrogen Product: Developing solid oxide fuel cells Website: www.versa-power.com...

  12. Power Electronic Thermal System Performance and Integration ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Motor Thermal Control Thermal Stress and Reliability for Advanced Power Electronics and Electric Machines Integrated Vehicle Thermal Management

  13. Solar photovoltaic applications seminar: design, installation and operation of small, stand-alone photovoltaic power systems

    SciTech Connect (OSTI)

    Not Available

    1980-07-01

    This seminar material was developed primarily to provide solar photovoltaic (PV) applied engineering technology to the Federal community. An introduction to photoconductivity, semiconductors, and solar photovoltaic cells is included along with a demonstration of specific applications and application identification. The seminar details general systems design and incorporates most known information from industry, academia, and Government concerning small solar cell power system design engineering, presented in a practical and applied manner. Solar PV power system applications involve classical direct electrical energy conversion and electric power system analysis and synthesis. Presentations and examples involve a variety of disciplines including structural analysis, electric power and load analysis, reliability, sizing and optimization; and, installation, operation and maintenance. Four specific system designs are demonstrated: water pumping, domestic uses, navigational and aircraft aids, and telecommunications. All of the applications discussed are for small power requirement (under 2 kilowatts), stand-alone systems to be used in remote locations. Also presented are practical lessons gained from currently installed and operating systems, problems at sites and their resolution, a logical progression through each major phase of system acquisition, as well as thorough design reviews for each application.

  14. System-wide emissions implications of increased wind power penetration.

    SciTech Connect (OSTI)

    Valentino, L.; Valenzuela, V.; Botterud, A.; Zhou, Z.; Conzelmann, G.

    2012-01-01

    This paper discusses the environmental effects of incorporating wind energy into the electric power system. We present a detailed emissions analysis based on comprehensive modeling of power system operations with unit commitment and economic dispatch for different wind penetration levels. First, by minimizing cost, the unit commitment model decides which thermal power plants will be utilized based on a wind power forecast, and then, the economic dispatch model dictates the level of production for each unit as a function of the realized wind power generation. Finally, knowing the power production from each power plant, the emissions are calculated. The emissions model incorporates the effects of both cycling and start-ups of thermal power plants in analyzing emissions from an electric power system with increasing levels of wind power. Our results for the power system in the state of Illinois show significant emissions effects from increased cycling and particularly start-ups of thermal power plants. However, we conclude that as the wind power penetration increases, pollutant emissions decrease overall due to the replacement of fossil fuels.

  15. 2014 Earth System Grid Federation and Ultrascale Visualization Climate Data Analysis Tools Conference Report

    SciTech Connect (OSTI)

    Williams, Dean N.

    2015-01-27

    The climate and weather data science community met December 9–11, 2014, in Livermore, California, for the fourth annual Earth System Grid Federation (ESGF) and Ultrascale Visualization Climate Data Analysis Tools (UV-CDAT) Face-to-Face (F2F) Conference, hosted by the Department of Energy, National Aeronautics and Space Administration, National Oceanic and Atmospheric Administration, the European Infrastructure for the European Network of Earth System Modelling, and the Australian Department of Education. Both ESGF and UVCDATremain global collaborations committed to developing a new generation of open-source software infrastructure that provides distributed access and analysis to simulated and observed data from the climate and weather communities. The tools and infrastructure created under these international multi-agency collaborations are critical to understanding extreme weather conditions and long-term climate change. In addition, the F2F conference fosters a stronger climate and weather data science community and facilitates a stronger federated software infrastructure. The 2014 F2F conference detailed the progress of ESGF, UV-CDAT, and other community efforts over the year and sets new priorities and requirements for existing and impending national and international community projects, such as the Coupled Model Intercomparison Project Phase Six. Specifically discussed at the conference were project capabilities and enhancements needs for data distribution, analysis, visualization, hardware and network infrastructure, standards, and resources.

  16. Nuclear Systems Powering a Mission to Mars | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Powering a Mission to Mars Nuclear Systems Powering a Mission to Mars November 28, 2011 - 11:23am Addthis Radioisotope Power Systems, a strong partnership between the Energy Department's Office of Nuclear Energy and NASA, has been providing the energy for deep space exploration. Assistant Secretary Lyons Assistant Secretary Lyons Assistant Secretary for Nuclear Energy Curiosity Mission: investigate whether the Gale Crater on Mars has ever offered environmental conditions that support the

  17. Hybrid robust predictive optimization method of power system dispatch

    DOE Patents [OSTI]

    Chandra, Ramu Sharat; Liu, Yan; Bose, Sumit; de Bedout, Juan Manuel

    2011-08-02

    A method of power system dispatch control solves power system dispatch problems by integrating a larger variety of generation, load and storage assets, including without limitation, combined heat and power (CHP) units, renewable generation with forecasting, controllable loads, electric, thermal and water energy storage. The method employs a predictive algorithm to dynamically schedule different assets in order to achieve global optimization and maintain the system normal operation.

  18. Ultra Efficient Combined Heat, Hydrogen, and Power System - Fact Sheet,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 | Department of Energy Ultra Efficient Combined Heat, Hydrogen, and Power System - Fact Sheet, 2015 Ultra Efficient Combined Heat, Hydrogen, and Power System - Fact Sheet, 2015 FuelCell Energy, Inc., in collaboration with Abbott Furnace Company, is developing a combined heat, hydrogen, and power (CHHP) system that utilizes reducing gas produced by a high-temperature fuel cell to directly replace hydrogen in metal treatment and other industrial processes. Excess reducing gas can be

  19. DOE Scientist Earns Chairman's Award from Propulsion and Power Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alliance | Department of Energy Scientist Earns Chairman's Award from Propulsion and Power Systems Alliance DOE Scientist Earns Chairman's Award from Propulsion and Power Systems Alliance October 2, 2009 - 1:00pm Addthis Washington, DC - A researcher at the Office of Fossil Energy's National Energy Technology Laboratory (NETL) has been presented with the Chairman's Award by the Propulsion and Power Systems Alliance (PPSA). Mary Anne Alvin, a physical scientist in NETL's Office of Research

  20. The National Carbon Capture Center at the Power Systems Development

    Office of Scientific and Technical Information (OSTI)

    Facility (Other) | SciTech Connect Other: The National Carbon Capture Center at the Power Systems Development Facility Citation Details In-Document Search Title: The National Carbon Capture Center at the Power Systems Development Facility The Power Systems Development Facility (PSDF) is a state-of-the-art test center sponsored by the U.S. Department of Energy (DOE) and dedicated to the advancement of clean coal technology. In addition to the development of high efficiency coal gasification

  1. The National Carbon Capture Center at the Power Systems Development

    Office of Scientific and Technical Information (OSTI)

    Facility (Technical Report) | SciTech Connect The National Carbon Capture Center at the Power Systems Development Facility Citation Details In-Document Search Title: The National Carbon Capture Center at the Power Systems Development Facility The Power Systems Development Facility (PSDF) is a state-of-the-art test center sponsored by the U.S. Department of Energy and dedicated to the advancement of clean coal technology. In addition to the development of high efficiency coal gasification

  2. Concentrating Solar Power Thermal Storage System Basics | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Concentrating Solar Power Thermal Storage System Basics Concentrating Solar Power Thermal Storage System Basics August 21, 2013 - 10:33am Addthis One challenge facing the widespread use of solar energy is reduced or curtailed energy production when the sun sets or is blocked by clouds. Thermal energy storage provides a workable solution to this challenge. In a concentrating solar power (CSP) system, the sun's rays are reflected onto a receiver, which creates heat that is used to

  3. Power Systems of the Future: A 21st Century Power Partnership Thought Leadership Report

    SciTech Connect (OSTI)

    Zinaman, O.; Miller, M.; Adil, A.; Arent, D.; Cochran, J.; Vora, R.; Aggarwal, S.; Bipath, M.; Linvill, C.; David, A.; Kauffman, R.; Futch, M.; Villanueva Arcos, E.; Valenzuela, J. M.; Martinot, E.; Bazilian, M.; Pillai, R. K.

    2015-02-01

    This report summarizes key forces driving transformation in the power sector around the world, presents a framework for evaluating decisions regarding extent and pace of change, and defines pathways for transformation. Powerful trends in technology, policy environments, financing, and business models are driving change in power sectors globally. In light of these trends, the question is no longer whether power systems will be transformed, but rather how these transformations will occur. Three approaches to policy and technology decision-making can guide these transformations: adaptive, reconstructive, and evolutionary. Within these approaches, we explore the five pathways that have emerged as viable models for power system transformation.

  4. Concentrating Solar Power Dish/Engine System Basics | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The dishengine system is a concentrating solar power (CSP) technology that produces relatively small amounts of electricity compared to other CSP technologies-typically in the ...

  5. AFTER A Framework for electrical power sysTems vulnerability...

    Open Energy Info (EERE)

    Ireland) Jump to: navigation, search Project Name AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration Country Ireland Coordinates...

  6. Combined Heat and Power System Enables 100% Reliability at Leading...

    Office of Environmental Management (EM)

    - Case Study, 2013 Combined Heat and Power System Enables 100% Reliability at Leading ... uninterrupted energy services to TECO customers in the event of a prolonged grid outage. ...

  7. AFTER A Framework for electrical power sysTems vulnerability...

    Open Energy Info (EERE)

    France) Jump to: navigation, search Project Name AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration Country France Coordinates...

  8. Turner Hunt Ocean Renewable (TRL 4 System) - THOR's Power Method...

    Energy Savers [EERE]

    More Documents & Publications CX-004722: Categorical Exclusion Determination Vortex Hydro Energy (TRL 5 6 System) - Advanced Integration of Power Take-Off in VIVACE Ocean...

  9. Ultra Efficient Combined Heat, Hydrogen, and Power System

    SciTech Connect (OSTI)

    2010-10-28

    Description of CHHP system which utilizes a high-temperature fuel cell to provide on-site process reducing gas, clean power, and heat.

  10. AFTER A Framework for electrical power sysTems vulnerability...

    Open Energy Info (EERE)

    United Kingdom) Jump to: navigation, search Project Name AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration Country United Kingdom...

  11. Fuel Cell Power Model for CHHP System Economics and Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cell Power Model for CHHP System Economics and Performance Analysis Presented at the Renewable Hydrogen Workshop, Nov. 16, 2009, in Palm Springs, CA renewablehydrogenworksho...

  12. ECIS-Princeton Power Systems, Inc.: Demand Response Inverter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Princeton Power Systems, Inc.: Demand Response Inverter - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable ...

  13. PROJECT PROFILE: Stabilizing the Power System in 2035 and Beyond...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Funding Program: SuNLaMP SunShot Subprogram: Systems Integration Location: National ... controls for power electronic inverters to emulate the dynamics of a nonlinear oscillator. ...

  14. Power Electronics and Balance of System Hardware Technologies

    Broader source: Energy.gov [DOE]

    DOE is targeting solar technology improvements related to power electronics and balance of system (BOS) hardware technologies to reduce the installed cost of solar photovoltaic (PV) electricity and...

  15. BioPower Systems Pty Ltd | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search Name: BioPower Systems Pty Ltd Address: Suite 145 National Innovation Centre Australian Technology Park Place: Eveleigh Zip: 1430 Region: Australia...

  16. Microsoft Word - Future Power Systems 20 - The Smart Enterprise...

    Broader source: Energy.gov (indexed) [DOE]

    all gives inefficient burn which costs more in fuel and emissions per kWh. Future Power Systems 20 The Smart Enterprise, its Objective and Forecasting. Steve ...

  17. Utilizing the Traction Drive Power Electronics System to Provide...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Traction Drive Power Electronics System to Provide Plug-in Capability for PHEVs Utilizing ... More Documents & Publications Current Source Inverters for HEVs and FCVs Converter ...

  18. AFTER A Framework for electrical power sysTems vulnerability...

    Open Energy Info (EERE)

    Germany) Jump to: navigation, search Project Name AFTER A Framework for electrical power sysTems vulnerability identification, dEfense and Restoration Country Germany Coordinates...

  19. Resource Planning for Power Systems: Integrating Renewables and New Technologies

    Broader source: Energy.gov [DOE]

    Become Kinetic is hosting a course to review resource planning issues and how they are being addressed to provide reliable and economic operation of the bulk power system.

  20. Visualization of Electric Power System Information: Workshop Proceedings

    SciTech Connect (OSTI)

    Kroposki, B.; Komomua, C.

    2013-01-01

    This report summarizes the workshop entitled: Visualization of Electric Power System Information. The workshop was held on September 11, 2012 on NREL's campus in Golden, Colorado.

  1. Power Electronic Thermal System Performance and Integration (Presentation)

    SciTech Connect (OSTI)

    Bennion, K.

    2009-05-01

    This presentation gives an overview of the status and FY09 accomplishments for the NREL Power Electronic Thermal System Performance and Integration Project.

  2. American Energy Power Systems Inc AEPS | Open Energy Information

    Open Energy Info (EERE)

    Sector: Solar Product: Offered distributed power systems including PV panels, solar water heating, fuel cells and radiant floor heating applications. References: American...

  3. Comparison of Different Internal Dosimetry Systems for Selected Radionuclides Important to Nuclear Power Production

    SciTech Connect (OSTI)

    Leggett, Richard Wayne; Eckerman, Keith F; Manger, Ryan P

    2013-08-01

    This report compares three different radiation dosimetry systems currently applied by various U.S. Federal agencies and dose estimates based on these three dosimetry systems for a set of radionuclides often identified in power reactor effluents. These dosimetry systems were developed and applied by the International Commission on Radiological Protection at different times over the past six decades. Two primary modes of intake of radionuclides are addressed: ingestion in drinking water and inhalation. Estimated doses to individual organs and to the whole body based on each dosimetry system are compared for each of four age groups: infant, child, teenager, and adult. Substantial differences between dosimetry systems in estimated dose per unit intake are found for some individual radionuclides, but differences in estimated dose per unit intake generally are modest for mixtures of radionuclides typically found in nuclear power plant effluents.

  4. Diode laser satellite systems for beamed power transmission

    SciTech Connect (OSTI)

    Williams, M.D.; Kwon, J.H.; Walker, G.H.; Humes, D.H.

    1990-01-01

    A power system composed of an orbiting laser satellite and a surface-based receiver/converter is described. Power is transmitted from the satellite to the receiver/converter by laser beam. The satellite components are: (1) solar collector; (2) blackbody; (3) photovoltaic cells; (4) heat radiators; (5) laser system; and (6) transmission optics. The receiver/converter components are: receiver dish; lenticular lens; photocells; and heat radiator. Although the system can be adapted to missions at many locations in the solar system, only two are examined here: powering a lunar habitat; and powering a lunar rover. Power system components are described and their masses, dimensions, operating powers, and temperatures, are estimated using known or feasible component capabilities. The critical technologies involved are discussed and other potential missions are mentioned.

  5. Solid oxide fuel cell steam reforming power system

    DOE Patents [OSTI]

    Chick, Lawrence A.; Sprenkle, Vincent L.; Powell, Michael R.; Meinhardt, Kerry D.; Whyatt, Greg A.

    2013-03-12

    The present invention is a Solid Oxide Fuel Cell Reforming Power System that utilizes adiabatic reforming of reformate within this system. By utilizing adiabatic reforming of reformate within the system the system operates at a significantly higher efficiency than other Solid Oxide Reforming Power Systems that exist in the prior art. This is because energy is not lost while materials are cooled and reheated, instead the device operates at a higher temperature. This allows efficiencies higher than 65%.

  6. System-wide power management control via clock distribution network

    DOE Patents [OSTI]

    Coteus, Paul W.; Gara, Alan; Gooding, Thomas M.; Haring, Rudolf A.; Kopcsay, Gerard V.; Liebsch, Thomas A.; Reed, Don D.

    2015-05-19

    An apparatus, method and computer program product for automatically controlling power dissipation of a parallel computing system that includes a plurality of processors. A computing device issues a command to the parallel computing system. A clock pulse-width modulator encodes the command in a system clock signal to be distributed to the plurality of processors. The plurality of processors in the parallel computing system receive the system clock signal including the encoded command, and adjusts power dissipation according to the encoded command.

  7. Performance assessment of OTEC power systems and thermal power plants. Final report. Volume I

    SciTech Connect (OSTI)

    Leidenfrost, W.; Liley, P.E.; McDonald, A.T.; Mudawwar, I.; Pearson, J.T.

    1985-05-01

    The focus of this report is on closed-cycle ocean thermal energy conversion (OTEC) power systems under research at Purdue University. The working operations of an OTEC power plant are briefly discussed. Methods of improving the performance of OTEC power systems are presented. Brief discussions on the methods of heat exchanger analysis and design are provided, as are the thermophysical properties of the working fluids and seawater. An interactive code capable of analyzing OTEC power system performance is included for use with an IBM personal computer.

  8. Concentrating Solar Power Parabolic Trough Systems

    Broader source: Energy.gov [DOE]

    In this b-roll, the parabolic solar trough is just one of the several types of concentrating solar power technologies that focus the sun's heat using reflective surfaces to generate electricity.

  9. Advancement Of Tritium Powered Betavoltaic Battery Systems

    SciTech Connect (OSTI)

    Staack, G.; Gaillard, J.; Hitchcock, D.; Peters, B.; Colon-Mercado, H.; Teprovich, J.; Coughlin, J.; Neikirk, K.; Fisher, C.

    2015-10-14

    Due to their decades-long service life and reliable power output under extreme conditions, betavoltaic batteries offer distinct advantages over traditional chemical batteries, especially in applications where frequent battery replacement is hazardous, or cost prohibitive. Although many beta emitting isotopes exist, tritium is considered ideal in betavoltaic applications for several reasons: 1) it is a “pure” beta emitter, 2) the beta is not energetic enough to damage the semiconductor, 3) it has a moderately long half-life, and 4) it is readily available. Unfortunately, the widespread application of tritium powered betavoltaics is limited, in part, by their low power output. This research targets improving the power output of betavoltaics by increasing the flux of beta particles to the energy conversion device (the p-n junction) through the use of low Z nanostructured tritium trapping materials.

  10. Thermoacoustic power systems for space applications

    SciTech Connect (OSTI)

    Backhaus, S. N.; Tward, E.; Pedach, M.

    2001-01-01

    Future NASA deep-space missions will require radioisotope-powered electric generators that are just as reliable as current RTGs, but more efficient and of higher specific power (W/kg). Thermoacoustic engines can convert high-temperature heat into acoustic, or PV, power without moving parts at 30% efficiency. Consisting of only tubes and a few heat exchangers, these engines are low mass and promise to be highly reliable. Coupling a thermoacoustic engine to a low-mass, highly reliable and efficient linear alternator will create a heat-driven electric generator suitable for deep-space applications. Data will be presented on the first tests of a demonstration thermoacoustic engine designed for the 100-Watt power range.

  11. Photonic Power Systems Inc | Open Energy Information

    Open Energy Info (EERE)

    Zip: 95014-2305 Product: Provider of GaAs and InP-based solutions for delivering electrical power over fibre for numerous electronic applications. Coordinates: 37.31884,...

  12. Connecting renewable power sources into the system

    SciTech Connect (OSTI)

    Wetzler, F.U.

    1982-11-01

    The many technical, legal, and economic issues that must be overcome before windmills, fuel cells, and photovoltaics can serve existing grids ae discusssed. Distributed storage and generation sources (DSGs) consist of energy converters to transform sun, wind, or chemical energy into electricity; a power conditioner to convert dc to ac; relays, breakers, and fuses for equipment protection and personnel safety; and appropriate load-metering equipment for billing customers. Aside from windmills and windfarms, there are few utility owned DSGs. The Public Utilities Regulatory Policy Act (1978) requires utilities to permit the connection to their power grids of private DSGs with capacities of up to 80 MW. In addition, the utilities must purchase the power from the DSG owned at ''just and reasonable rates'' and offer to supply backup power if the owner's facility malfunctions. Before connecting to a utility line, a DSG entrepreneur must meet certain specifications spelled out by the participating utility. Long-range power-distribution strategies will be needed to assess various automated distribution schemes that have been proposed, together with communication techniques to control and coordinate the small and large DSG within a highly complex power grid.

  13. Diagnosis system to improve heat rate in fossil power plants

    SciTech Connect (OSTI)

    Arroyo-Figueroa, G.; Villavicencio R., A.

    1996-05-01

    Today fossil fuel power plants is showing a trend toward full automation. This increases the difficulty for human operators to follow in detail the progress of power plants, and also limit the contribution of human operators to diagnostic task. Therefore, automated and intelligent fault diagnostic systems have been intensively investigated. Despite several successful examples of diagnostic systems, often called expert systems, the development task of a diagnostic system still remains empiric and is unique for each system. This paper discusses the design of a Diagnostic System to improve Heat Rate for fossil fuel power plant. The approach is characterized as an fault tree diagnostic system. The prototype of this system has showed the benefits and the feasibility of using this system to diagnose equipment in power plants.

  14. Interactive long-term simulation for power system restoration planning

    SciTech Connect (OSTI)

    Fountas, N.A.; Hatziargyriou, N.D. [National Technical Univ., Athens (Greece)] [National Technical Univ., Athens (Greece); Orfanogiannis, C.; Tasoulis, A. [Public Power Corp., Athens (Greece)] [Public Power Corp., Athens (Greece)

    1997-02-01

    The problem of restoring a power system following a complete blackout is complex and multi-faceted. Many control actions have to be performed on time, while constraints such as power balance and system stability have to be carefully respected. In this paper, the application of long-term dynamic analysis in studying frequency and voltage responses due to load and generation mismatches in isolated systems or during extension of the existing system in the restoration phase is presented. Simulation results covering the main steps of the Hellenic power system restoration process following a recent total blackout are presented and discussed.

  15. Bimode uninterruptible power supply compatibility in renewable hybrid energy systems

    SciTech Connect (OSTI)

    Bower, W. ); O'Sullivan, G. )

    1990-08-01

    Inverters installed in renewable hybrid energy systems are typically used in a stand-alone mode to supply ac power to loads from battery storage when the engine-generator is not being used. Similarities in topology and in the performance requirements of the standby uninterruptible power supply (UPS) system and the hybrid system suggest the UPS could be used in hybrid energy systems. Another alternative to inverters with add-on charging circuits or standby UPS hardware is the Bimode UPS. The bimode UPS uses common circuitry and power components for dc to ac inversion and battery charging. It also provides an automatic and nearly instantaneous ac power transfer function when the engine-generator is started or stopped. The measured operating and transfer characteristics of a bimode UPS in a utility system and in a hybrid system are presented. The applicability of the bimode UPS to hybrid systems and its compatibility in a PV/engine-generator hybrid system are given.

  16. Selected financial and operating ratios of public power systems

    SciTech Connect (OSTI)

    Choate, S.

    1996-01-01

    This article is a review of the title publication, which is produced by the American Public Power Association. The report is considered to be a valuable management tool to public power systems in evaluating their competitive positions in the dynamic electric utility industry. It examines 22 categories of ratio indicators that can be used by public power systems to assess their performance relative to other utilities of comparable size in the same geographic region. More than 400 utilities are summarized in the report.

  17. Energy Storage Systems 2007 Peer Review - Power Electronics Presentations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Power Electronics Presentations Energy Storage Systems 2007 Peer Review - Power Electronics Presentations The U.S. DOE Energy Storage Systems Program (ESS) held an annual peer review on September 27, 2007 in San Francisco, CA. Eighteen presentations were divided into categories; those related to power electronics are below. Other presentation categories were: Economics - Benefit Studies and Environment Benefit Studies Utility & Commercial Applications of Advanced

  18. Saft Power Systems | Open Energy Information

    Open Energy Info (EERE)

    and systems, servicing the telecom and coal industries; in particular, manufacturers inverters and balance of systems for solar industry. Coordinates: 48.88811, 2.194915 Show...

  19. Feasibility of integrating other federal information systems into the Global Network of Environment and Technology, GNET{reg_sign}

    SciTech Connect (OSTI)

    1998-05-01

    The Global Environment and Technology Enterprise (GETE) of the Global Environment and Technology Foundation (GETF) has been tasked by the US Department of Energy`s (DOE), Federal Energy Technology Center (FETC) to assist in reducing DOE`s cost for the Global Network of Environment and Technology (GNET{reg_sign}). As part of this task, GETE is seeking federal partners to invest in GNET{reg_sign}. The authors are also seeking FETC`s commitment to serve as GNET`s federal agency champion promoting the system to potential agency partners. This report assesses the benefits of partnering with GNET{reg_sign} and provides recommendations for identifying and integrating other federally funded (non-DOE) environmental information management systems into GNET{reg_sign}.

  20. High Dielectric Constant Capacitors for Power Electronic Systems |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy 09 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. ape_05_balachandran.pdf (912.46 KB) More Documents & Publications High Dialectric Constant Capacitors for Power Electronic Systems High Dialectric Constant Capacitors for Power Electronic Systems High Dialectric

  1. Assessment of ceramic composites for MMW space nuclear power systems

    SciTech Connect (OSTI)

    Besmann, T.M.

    1987-01-01

    Proposed multimegawatt nuclear power systems which operate at high temperatures, high levels of stress, and in hostile environments, including corrosive working fluids, have created interest in the use of ceramic composites as structural materials. This report assesses the applicability of several ceramic composites in both Brayton and Rankine cycle power systems. This assessment considers an equilibrium thermodynamic analysis and also a nonequilibrium assessment. (FI)

  2. PRESSURIZED SOLID OXIDE FUEL CELL/GAS TURBINE POWER SYSTEM

    SciTech Connect (OSTI)

    W.L. Lundberg; G.A. Israelson; R.R. Moritz; S.E. Veyo; R.A. Holmes; P.R. Zafred; J.E. King; R.E. Kothmann

    2000-02-01

    Power systems based on the simplest direct integration of a pressurized solid oxide fuel cell (SOFC) generator and a gas turbine (GT) are capable of converting natural gas fuel energy to electric power with efficiencies of approximately 60% (net AC/LHV), and more complex SOFC and gas turbine arrangements can be devised for achieving even higher efficiencies. The results of a project are discussed that focused on the development of a conceptual design for a pressurized SOFC/GT power system that was intended to generate 20 MWe with at least 70% efficiency. The power system operates baseloaded in a distributed-generation application. To achieve high efficiency, the system integrates an intercooled, recuperated, reheated gas turbine with two SOFC generator stages--one operating at high pressure, and generating power, as well as providing all heat needed by the high-pressure turbine, while the second SOFC generator operates at a lower pressure, generates power, and provides all heat for the low-pressure reheat turbine. The system cycle is described, major system components are sized, the system installed-cost is estimated, and the physical arrangement of system components is discussed. Estimates of system power output, efficiency, and emissions at the design point are also presented, and the system cost of electricity estimate is developed.

  3. Suitland Federal Center, Suitland, Maryland | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Suitland Federal Center, Suitland, Maryland Suitland Federal Center, Suitland, Maryland Photo of Suitland Federal Center The Suitland Federal Center, five miles east of Washington, D.C., installed a photovoltaic (PV) system that was as part of President Clinton's "Million Solar Roofs" initiative. The General Services Administration (GSA) paid for the installation with help from the U.S. Department of Energy (DOE) through the Solar Electric Power Association TEAM-UP program. The

  4. Power conditioning system for energy sources

    DOE Patents [OSTI]

    Mazumder, Sudip K.; Burra, Rajni K.; Acharya, Kaustuva

    2008-05-13

    Apparatus for conditioning power generated by an energy source includes an inverter for converting a DC input voltage from the energy source to a square wave AC output voltage, and a converter for converting the AC output voltage from the inverter to a sine wave AC output voltage.

  5. Termination for superconducting power transmission systems

    DOE Patents [OSTI]

    Forsyth, E.B.; Jensen, J.E.

    1975-08-26

    This patent relates to a cold, electrical gradient, terminal section for a superconducting cable for alternating current power transmission. A cold electrical gradient section filled with a gaseous coolant acting as an insulator is provided in series with a separate thermal gradient section. (auth)

  6. Bi-directional power control system for voltage converter

    DOE Patents [OSTI]

    Garrigan, N.R.; King, R.D.; Schwartz, J.E.

    1999-05-11

    A control system for a voltage converter includes: a power comparator for comparing a power signal on input terminals of the converter with a commanded power signal and producing a power comparison signal; a power regulator for transforming the power comparison signal to a commanded current signal; a current comparator for comparing the commanded current signal with a measured current signal on output terminals of the converter and producing a current comparison signal; a current regulator for transforming the current comparison signal to a pulse width modulator (PWM) duty cycle command signal; and a PWM for using the PWM duty cycle command signal to control electrical switches of the converter. The control system may further include: a command multiplier for converting a voltage signal across the output terminals of the converter to a gain signal having a value between zero (0) and unity (1), and a power multiplier for multiplying the commanded power signal by the gain signal to provide a limited commanded power signal, wherein power comparator compares the limited commanded power signal with the power signal on the input terminals. 10 figs.

  7. Bi-directional power control system for voltage converter

    DOE Patents [OSTI]

    Garrigan, Neil Richard; King, Robert Dean; Schwartz, James Edward

    1999-01-01

    A control system for a voltage converter includes: a power comparator for comparing a power signal on input terminals of the converter with a commanded power signal and producing a power comparison signal; a power regulator for transforming the power comparison signal to a commanded current signal; a current comparator for comparing the commanded current signal with a measured current signal on output terminals of the converter and producing a current comparison signal; a current regulator for transforming the current comparison signal to a pulse width modulator (PWM) duty cycle command signal; and a PWM for using the PWM duty cycle command signal to control electrical switches of the converter. The control system may further include: a command multiplier for converting a voltage signal across the output terminals of the converter to a gain signal having a value between zero (0) and unity (1), and a power multiplier for multiplying the commanded power signal by the gain signal to provide a limited commanded power signal, wherein power comparator compares the limited commanded power signal with the power signal on the input terminals.

  8. Microsoft PowerPoint - Franklin System IO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    File Systems & IO Richard Gerber NERSC User Services RAGerber@lbl.gov NERSC Users Group Berkeley Lab Oakland, CA October 2, 2008 Oct. 2, 2008 NUG 2008, Berkeley Lab, NERSC Oakland Scientific Facility Outline * File Systems * System Layout * Best Practices * Details * Reference www.nersc.gov www.nersc.gov/nusers/systems/franklin Oct. 2, 2008 NUG 2008, Berkeley Lab, NERSC Oakland Scientific Facility Franklin File Systems Oct. 2, 2008 NUG 2008, Berkeley Lab, NERSC Oakland Scientific Facility

  9. A portable power system using PEM fuel cells

    SciTech Connect (OSTI)

    Long, E.

    1997-12-31

    Ball has developed a proof-of-concept, small, lightweight, portable power system. The power system uses a proton exchange membrane (PEM) fuel cell stack, stored hydrogen, and atmospheric oxygen as the oxidant to generate electrical power. Electronics monitor the system performance to control cooling air and oxidant flow, and automatically do corrective measures to maintain performance. With the controller monitoring the system health, the system can operate in an ambient environment from 0 C to +50 C. The paper describes system testing, including load testing, thermal and humidity testing, vibration and shock testing, field testing, destructive testing of high-pressure gas tanks, and test results on the fuel cell power system, metal hydride hydrogen storage, high-pressure hydrogen gas storage, and chemical hydride hydrogen storage.

  10. Wind for Schools Project Power System Brief, Wind Powering America Fact Sheet Series

    SciTech Connect (OSTI)

    Baring-Gould, I.

    2009-05-01

    Wind Powering America's (WPA's) Wind for Schools project uses a basic system configuration for each school project. The system incorporates a single SkyStream wind turbine, a 70-ft guyed tower, disconnect boxes at the base of the turbine and at the school, and an interconnection to the school's electrical system. This document provides a detailed description of each system component.

  11. Federal Biomass Activities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    stewardship, environmental management systems stewardship, environmental management ... especially E85 pumps - - DOE GIS database identifying location of Federal fleets ...

  12. Energy Storage for Power Systems Applications: A Regional Assessment for the Northwest Power Pool (NWPP)

    SciTech Connect (OSTI)

    Kintner-Meyer, Michael CW; Balducci, Patrick J.; Jin, Chunlian; Nguyen, Tony B.; Elizondo, Marcelo A.; Viswanathan, Vilayanur V.; Guo, Xinxin; Tuffner, Francis K.

    2010-04-01

    Wind production, which has expanded rapidly in recent years, could be an important element in the future efficient management of the electric power system; however, wind energy generation is uncontrollable and intermittent in nature. Thus, while wind power represents a significant opportunity to the Bonneville Power Administration (BPA), integrating high levels of wind resources into the power system will bring great challenges to generation scheduling and in the provision of ancillary services. This report addresses several key questions in the broader discussion on the integration of renewable energy resources in the Pacific Northwest power grid. More specifically, it addresses the following questions: a) how much total reserve or balancing requirements are necessary to accommodate the simulated expansion of intermittent renewable energy resources during the 2019 time horizon, and b) what are the most cost effective technological solutions for meeting load balancing requirements in the Northwest Power Pool (NWPP).

  13. Development of a General Purpose Power System Control Board

    SciTech Connect (OSTI)

    Nam, S.H.; Jeong, S.H.; Kim, S.H.; Kim, S.C.; Park, S.S.; Suh, J.H.; Bellomo, P.; Cassel, R.; Larsen, R.; Nguyen, M.N.; /SLAC

    2007-07-23

    In an effort to control modern solid state power modules, a general purpose, multi function power system control board (PSCB) has been under development as a collaboration project between Pohang Accelerator Laboratory (PAL), Korea, and Stanford Linear Accelerator Center (SLAC), USA. The PSCB is an embedded, interlock supervisory, diagnostic, timing, and set-point control board. It is designed to use in various power systems such as sequenced kicker pulsers, solid state RF modulators, simple DC magnet power supplies, etc. The PSCB has the Ethernet communication with the TCP/IP Modbus protocol.

  14. An Approach to Autonomous Control for Space Nuclear Power Systems

    SciTech Connect (OSTI)

    Wood, Richard Thomas; Upadhyaya, Belle R.

    2011-01-01

    Under Project Prometheus, the National Aeronautics and Space Administration (NASA) investigated deep space missions that would utilize space nuclear power systems (SNPSs) to provide energy for propulsion and spacecraft power. The initial study involved the Jupiter Icy Moons Orbiter (JIMO), which was proposed to conduct in-depth studies of three Jovian moons. Current radioisotope thermoelectric generator (RTG) and solar power systems cannot meet expected mission power demands, which include propulsion, scientific instrument packages, and communications. Historically, RTGs have provided long-lived, highly reliable, low-power-level systems. Solar power systems can provide much greater levels of power, but power density levels decrease dramatically at {approx} 1.5 astronomical units (AU) and beyond. Alternatively, an SNPS can supply high-sustained power for space applications that is both reliable and mass efficient. Terrestrial nuclear reactors employ varying degrees of human control and decision-making for operations and benefit from periodic human interaction for maintenance. In contrast, the control system of an SNPS must be able to provide continuous operatio for the mission duration with limited immediate human interaction and no opportunity for hardware maintenance or sensor calibration. In effect, the SNPS control system must be able to independently operate the power plant while maintaining power production even when subject to off-normal events and component failure. This capability is critical because it will not be possible to rely upon continuous, immediate human interaction for control due to communications delays and periods of planetary occlusion. In addition, uncertainties, rare events, and component degradation combine with the aforementioned inaccessibility and unattended operation to pose unique challenges that an SNPS control system must accommodate. Autonomous control is needed to address these challenges and optimize the reactor control design.

  15. Linking Humans and Systems in Nuclear Power

    SciTech Connect (OSTI)

    Jacques Hugo

    2013-02-01

    Traditional engineering methods do not make provision for the integration of human considerations, while traditional human factors methods do not scale well to the complexity of large-scale nuclear power plant projects. Although the need for up-to-date human factors engineering processes and tools is recognised widely in industry, so far no formal guidance has been developed. This article proposes such a framework.

  16. TWRS privatization phase 1 electrical power system

    SciTech Connect (OSTI)

    Singh, G.

    1997-05-30

    This document includes Conceptual Design Report (CDR) for a new 11 km (7 miles) 230 kV transmission line and a new 40 MVA substation (A6) which will be located east of Grout Facility in 200E Area tank farm. This substation will provide electrical power up to 20 MW each for two private contractor facilities for immobilization and disposal of low activity waste (LAW).

  17. Power generating system and method utilizing hydropyrolysis

    DOE Patents [OSTI]

    Tolman, R.

    1986-12-30

    A vapor transmission cycle is described which burns a slurry of coal and water with some of the air from the gas turbine compressor, cools and cleans the resulting low-Btu fuel gas, burns the clean fuel gas with the remaining air from the compressor, and extracts the available energy in the gas turbine. The cycle lends itself to combined-cycle cogeneration for the production of steam, absorption cooling, and electric power.

  18. Technology Potential of Thermal Energy Storage (TES) Systems in Federal Facilities

    SciTech Connect (OSTI)

    Chvala, William D.

    2001-07-31

    This document presents the findings of a technology market assessment for thermal energy storage (TES) in space cooling applications. The potential impact of TES in Federal facilities is modeled using the Federal building inventory with the appropriate climatic and energy cost data. In addition, this assessment identified acceptance issues and major obstacles through interviews with energy services companies (ESCOs), TES manufacturers, and Federal facility staff.

  19. Approximate Bisimulation-Based Reduction of Power System Dynamic Models

    SciTech Connect (OSTI)

    Stankovic, AM; Dukic, SD; Saric, AT

    2015-05-01

    In this paper we propose approximate bisimulation relations and functions for reduction of power system dynamic models in differential- algebraic (descriptor) form. The full-size dynamic model is obtained by linearization of the nonlinear transient stability model. We generalize theoretical results on approximate bisimulation relations and bisimulation functions, originally derived for a class of constrained linear systems, to linear systems in descriptor form. An algorithm for transient stability assessment is proposed and used to determine whether the power system is able to maintain the synchronism after a large disturbance. Two benchmark power systems are used to illustrate the proposed algorithm and to evaluate the applicability of approximate bisimulation relations and bisimulation functions for reduction of the power system dynamic models.

  20. Cathode power distribution system and method of using the same for power distribution

    DOE Patents [OSTI]

    Williamson, Mark A; Wiedmeyer, Stanley G; Koehl, Eugene R; Bailey, James L; Willit, James L; Barnes, Laurel A; Blaskovitz, Robert J

    2014-11-11

    Embodiments include a cathode power distribution system and/or method of using the same for power distribution. The cathode power distribution system includes a plurality of cathode assemblies. Each cathode assembly of the plurality of cathode assemblies includes a plurality of cathode rods. The system also includes a plurality of bus bars configured to distribute current to each of the plurality of cathode assemblies. The plurality of bus bars include a first bus bar configured to distribute the current to first ends of the plurality of cathode assemblies and a second bus bar configured to distribute the current to second ends of the plurality of cathode assemblies.

  1. Integration of ocean thermal energy conversion power plants with existing power systems

    SciTech Connect (OSTI)

    Arunasalam, N.

    1986-01-01

    The problem of integrating an Ocean Thermal Energy Conversion (OTEC) power plant with existing power systems is studied. A nonlinear model of an OTEC power system is developed. The dynamics of the large local induction motor load, and the coaxial cable connection to the mainland are included in the model. The effect of the motor load and the coaxial cable on the steady-state stability of the OTEC power plant is investigated using linearized analysis. The transient stability of the OTEC system is investigated through simulation. The contribution made by the motor load and the coaxial cable to the transient stability is studied. The occurrence of self excitation phenomena is analyzed using linear methods and simulation. The effects of wave and vessel motion on the electrical power output of the OTEC plant is investigated.

  2. High power laser downhole cutting tools and systems

    DOE Patents [OSTI]

    Zediker, Mark S; Rinzler, Charles C; Faircloth, Brian O; Koblick, Yeshaya; Moxley, Joel F

    2015-01-20

    Downhole cutting systems, devices and methods for utilizing 10 kW or more laser energy transmitted deep into the earth with the suppression of associated nonlinear phenomena. Systems and devices for the laser cutting operations within a borehole in the earth. These systems and devices can deliver high power laser energy down a deep borehole, while maintaining the high power to perform cutting operations in such boreholes deep within the earth.

  3. High power laser workover and completion tools and systems

    DOE Patents [OSTI]

    Zediker, Mark S; Rinzler, Charles C; Faircloth, Brian O; Koblick, Yeshaya; Moxley, Joel F

    2014-10-28

    Workover and completion systems, devices and methods for utilizing 10 kW or more laser energy transmitted deep into the earth with the suppression of associated nonlinear phenomena. Systems and devices for the laser workover and completion of a borehole in the earth. These systems and devices can deliver high power laser energy down a deep borehole, while maintaining the high power to perform laser workover and completion operations in such boreholes deep within the earth.

  4. Combined Heat and Power (CHP) Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distributed Energy » Combined Heat and Power (CHP) Systems Combined Heat and Power (CHP) Systems The CHP systems program aimed to facilitate acceptance of distributed energy in end-use sectors by forming partnerships with industry consortia in the commercial building, merchant stores, light industrial, supermarkets, restaurants, hospitality, health care and high-tech industries. In high-tech industries such as telecommunications, commercial data processing and internet services, the use of

  5. NREL: Energy Systems Integration - NREL Power Systems Engineering...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Results are validated through a case study based on the IEEE first benchmark model for SSR studies as well as with transient computer simulations. Power Quality Surveys of ...

  6. Strategic stockpiling of power system supplies for disaster recovery

    SciTech Connect (OSTI)

    Bent, Russell W; Coffrein, Carleton; Van Hentenryck, Pascal

    2010-11-23

    This paper studies the Power System Stochastic Storage Problem (PSSSP), a novel application in power restoration which consists of deciding how to store power system components throughout a populated area to maximize the amount of power served after disaster restoration. The paper proposes an exact mixed-integer formulation for the linearized DC power flow model and a general column-generation approach. Both formulations were evaluated experimentally on benchmarks using the electrical power infrastructure of the United States and disaster scenarios generated by state-of-the-art hurricane simulation tools similar to those used by the National Hurricane Center. The results show that the column-generation algorithm produces near-optimal solutions quickly and produces orders of magnitude speedups over the exact formulation for large benchmarks. Moreover, both the exact and the column-generation formulations produce significant improvements over greedy approach and hence should yield significant benefits in practice.

  7. Important technology considerations for space nuclear power systems

    SciTech Connect (OSTI)

    Kuspa, J.P.; Wahlquist, E.J.; Bitz, D.A.

    1988-03-01

    This paper discusses the technology considerations that guide the development of space nuclear power sources (NPS) by the Department of Energy (DOE) to meet a wide variety of applications. The Department and its predecessor agencies have been developing NPS since the 1950s and producing NPS for spacecraft for the National Aeronautics and Space Administration (NASA) and the Department of Defense (DOD) since the early 1960s. No one nuclear power type, isotope or reactor, will suffice over the entire range of mission power required. Nor is one type of power conversion system, be it static or dynamic, the optimum choice of all space nuclear power system applications. There is a need for DOE, in partnership with its users, NASA and DOD, to develop a variety of types of space nuclear power sources -- isotope-static, isotope-dynamic, reactor-static, and reactor-dynamic -- to meet mission requirements well into the next century. 2 figs., 1 tab.

  8. NREL: Concentrating Solar Power Research - Systems Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    solar financial models developed and integrated into the System Advisor Model (SAM) software Grid penetration and life-cycle analysis studies The Solar-augment study of...

  9. Ballard Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Avenue Place: Lowell, Massachusetts Zip: 01851 Region: Greater Boston Area Sector: Hydrogen Product: Designs and manufactures fuel cell systems Website: www.ballard.com...

  10. Innovative Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Valley Road Place: St. Paul, Minnesota Zip: 55108 Sector: Solar Product: solar and wind electric systems Year Founded: 1991 Phone Number: 612-623-3246 Website:...

  11. Power Electronic Thermal System Performance and Integration | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy 09 DOE Hydrogen Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting, May 18-22, 2009 -- Washington D.C. ape_13_bennion.pdf (1.2 MB) More Documents & Publications Power Electronic Thermal System Performance and Integration Integrated Power Module Cooling Vehicle Technologies Office: 2009 Advanced Power Electronics R&D Annual Progress Report

  12. DOE Technical Targets for Hydrogen Storage Systems for Portable Power

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Equipment | Department of Energy Portable Power Equipment DOE Technical Targets for Hydrogen Storage Systems for Portable Power Equipment These tables summarize hydrogen storage technical performance targets for portable power applications. These targets were developed with input to DOE through extensive communications with various stakeholders, industry developers, and end users, including through a 2012 request for information and workshops, as well as additional national lab assessments.

  13. Ultra Efficient Combined Heat, Hydrogen, and Power System - Presentation by

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FuelCell Energy, June 2011 | Department of Energy Ultra Efficient Combined Heat, Hydrogen, and Power System - Presentation by FuelCell Energy, June 2011 Ultra Efficient Combined Heat, Hydrogen, and Power System - Presentation by FuelCell Energy, June 2011 Presentation on Ultra Efficient Combined Heat, Hydrogen, and Power System, given by Pinakin Patel of FuelCell Energy, at the U.S. DOE Industrial Distributed Energy Portfolio Review Meeting in Washington, D.C. on June 1-2, 2011.

  14. Transportation engine commercialization at Ballard Power Systems

    SciTech Connect (OSTI)

    Otto, N.C.; Howard, P.F.

    1996-12-31

    Ballard is adapting its leading fuel cell technology for transit bus engines in three phases. In the first phase, completed in 1993, Ballard developed and demonstrated a 125 HP fuel cell engine in a 32-foot light duty transit bus. This was the world`s first zero-emission vehicle (ZEV) powered completely by PEM fuel cells. The bus is a reliable, smooth performing vehicle that clearly established the viability of Ballard Fuel Cells for zero-emission transit bus operation. In the second phase, completed in 1995, Ballard refined its fuel cell technology, building a 275 HP fuel cell engine for a 40-foot heavy duty transit bus. The fuel cell engine fits in the existing engine compartment and meets the performance of a combustion powered vehicle, but with no pollution. In the third phase, small fleets of ZEV buses will be tested with Chicago Transit Authority and BC Transit. These test fleets will provide the performance, cost and reliability data necessary for commercial production. Commercial production of Ballard`s environmentally clean engines will begin in the 1998-1999 timeframe.

  15. Electrical power systems for distributed generation

    SciTech Connect (OSTI)

    Robertson, T.A.; Huval, S.J.

    1996-12-31

    {open_quotes}Distributed Generation{close_quotes} has become the {open_quotes}buzz{close_quotes} word of an electric utility industry facing deregulation. Many industrial facilities utilize equipment in distributed installations to serve the needs of a thermal host through the capture of exhaust energy in a heat recovery steam generator. The electrical power generated is then sold as a {open_quotes}side benefit{close_quotes} to the cost-effective supply of high quality thermal energy. Distributed generation is desirable for many different reasons, each with unique characteristics of the product. Many years of experience in the distributed generation market has helped Stewart & Stevenson to define a range of product features that are crucial to most any application. The following paper will highlight a few of these applications. The paper will also examine the range of products currently available and in development. Finally, we will survey the additional services offered by Stewart & Stevenson to meet the needs of a rapidly changing power generation industry.

  16. High power RF systems for the BNL ERL project

    SciTech Connect (OSTI)

    Zaltsman, A.; Lambiase, R.

    2011-03-28

    The Energy Recovery Linac (ERL) project, now under construction at Brookhaven National Laboratory, requires two high power RF systems. The first RF system is for the 703.75 MHz superconducting electron gun. The RF power from this system is used to drive nearly half an Ampere of beam current to 2 MeV. There is no provision to recover any of this energy so the minimum amplifier power is 1 MW. It consists of 1 MW CW klystron, transmitter and power supplies, 1 MW circulator, 1 MW dummy load and a two-way power splitter. The second RF system is for the 703.75 MHz superconducting cavity. The system accelerates the beam to 54.7 MeV and recovers this energy. It will provide up to 50 kW of CW RF power to the cavity. It consists of 50 kW transmitter, circulator, and dummy load. This paper describes the two high power RF systems and presents the test data for both.

  17. R&D ERL: High power RF systems

    SciTech Connect (OSTI)

    Zaltsman, A.

    2010-01-15

    The Energy Recovery Linac (ERL) project, now under construction at Brookhaven National Laboratory, requires two high power RF systems. The first RF system is for the 703.75 MHz superconducting electron gun. The RF power from this system is used to drive nearly half an Ampere of beam current to 2.5 MeV. There is no provision to recover any of this energy so the minimum amplifier power is 1 MW. It consists of 1 MW CW klystron, transmitter and power supplies, 1 MW circulator, 1 MW dummy load and a two-way power splitter. The second RF system is for the 703.75 MHz superconducting cavity. The system accelerates the beam to 54.7 MeV and recovers this energy. It will provide up to 50 kW of CW RF power to the cavity. It consists of 50 kW transmitter, circulator, and dummy load. This paper describes the two high power RF systems and presents the test data for both.

  18. HEMP emergency planning and operating procedures for electric power systems

    SciTech Connect (OSTI)

    Reddoch, T.W.; Markel, L.C. )

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  19. Accelerating Acceptance of Fuel Cell Backup Power Systems - Final Report

    SciTech Connect (OSTI)

    Petrecky, James; Ashley, Christopher

    2014-07-21

    Since 2001, Plug Power has installed more than 800 stationary fuel cell systems worldwide. Plug Power’s prime power systems have produced approximately 6.5 million kilowatt hours of electricity and have accumulated more than 2.5 million operating hours. Intermittent, or backup, power products have been deployed with telecommunications carriers and government and utility customers in North and South America, Europe, the United Kingdom, Japan and South Africa. Some of the largest material handling operations in North America are currently using the company’s motive power units in fuel cell-powered forklifts for their warehouses, distribution centers and manufacturing facilities. The low-temperature GenSys fuel cell system provides remote, off-grid and primary power where grid power is unreliable or nonexistent. Built reliable and designed rugged, low- temperature GenSys delivers continuous or backup power through even the most extreme conditions. Coupled with high-efficiency ratings, low-temperature GenSys reduces operating costs making it an economical solution for prime power requirements. Currently, field trials at telecommunication and industrial sites across the globe are proving the advantages of fuel cells—lower maintenance, fuel costs and emissions, as well as longer life—compared with traditional internal combustion engines.

  20. Computing Criticality of Lines in Power Systems

    SciTech Connect (OSTI)

    Pinar, Ali; Reichert, Adam; Lesieutre, Bernard

    2006-10-13

    We propose a computationally efficient method based onnonlinear optimization to identify critical lines, failure of which cancause severe blackouts. Our method computes criticality measure for alllines at a time, as opposed to detecting a single vulnerability,providing a global view of the system. This information on criticality oflines can be used to identify multiple contingencies by selectivelyexploring multiple combinations of broken lines. The effectiveness of ourmethod is demonstrated on the IEEE 30 and 118 bus systems, where we canvery quickly detect the most critical lines in the system and identifysevere multiple contingencies.

  1. Accelrate Power Systems | Open Energy Information

    Open Energy Info (EERE)

    Systems Place: Vancouver, British Columbia, Canada Zip: V6E 4G1 Product: High Speed Battery Charger Technology. Coordinates: 49.26044, -123.114034 Show Map Loading map......

  2. Combined Heat and Power System Increases Reliability

    Energy Savers [EERE]

    ... The three boilers were over thirty years old, and if one boiler needed service, the remaining two boilers could no longer meet the plant's peak steam load. The CHP system can now ...

  3. Power Contro Energy Management and Market Systems

    SciTech Connect (OSTI)

    Tom Addison; Andrew Stanbury

    2005-12-15

    More efficient use of the nation's electrical energy infrastructure will result in minimizing the cost of energy to the end user. Using real time electrical market information coupled with defined rules, market opportunities can be identified that provide economic benefit for both users and marketers of electricity. This report describes the design of one such system and the features a fully functional system would provide. This report documents several investigated methods of controlling load diversity or shifting.

  4. Cooperative Control of Active Power Filters in Power Systems without Mutual Communication

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Tlust, Josef; kramlk, Ji?; vec, Jan; Valouch, Viktor

    2010-01-01

    The procedure for calculating controller parameters of the APFs implemented into a multibus industrial power system for harmonic voltage mitigation is presented. The node-voltage-detection control strategy is applied and the basic controller parameters are found under the condition that the demanded THD factors at the buses where the APFs are placed will be obtained. A cooperative control of several APFs without mutual communication is proposed, simulated, and experimentally verified. By tuning the controller gains without considering the power circuit parameters, all APFs used tend to share harmonic load currents approximately equally regardless of the operation modes of the nonlinear loadsmorein different parts of the power system.less

  5. Wind power on BPA system sets another new record

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RELEASE Tuesday, March 20, 2012 CONTACT: Mike Hansen, BPA 503-230-4328 or 503-230-5131 Wind power on BPA system sets another new record The renewable resource passes 4,000...

  6. Ultra Efficient Combined Heat, Hydrogen, and Power System - Presentati...

    Broader source: Energy.gov (indexed) [DOE]

    Presentation on Ultra Efficient Combined Heat, Hydrogen, and Power System, given by Pinakin Patel of FuelCell Energy, at the U.S. DOE Industrial Distributed Energy Portfolio Review ...

  7. Annex: Attributes of Proliferation Resistance for Civilian Nuclear Power Systems

    Broader source: Energy.gov [DOE]

    The NERAC1 Task Force on Technology Opportunities for Increasing the Proliferation Resistance of Global Civilian Nuclear Power Systems (TOPS) determined at its first meeting in November 1999 that a...

  8. The National Carbon Capture Center at the Power Systems Development...

    Office of Scientific and Technical Information (OSTI)

    The Power Systems Development Facility (PSDF) is a state-of-the-art test center sponsored by the U.S. Department of Energy and dedicated to the advancement of clean coal technology...

  9. Stoney Corners (Northern Power Systems) | Open Energy Information

    Open Energy Info (EERE)

    W 2,300,000,000 mW 0.0023 GW Number of Units 1 Commercial Online Date 2011 Wind Turbine Manufacturer Northern Power Systems References WENDI1 Loading map......

  10. OE Power Systems Engineering Research & Development Program Partnerships

    Broader source: Energy.gov [DOE]

    The OE Power Systems Research and Development Program engages a broad group of stakeholders in program planning, identification of high-priority technology gap areas, and joint participation in research, development, demonstration, and deployment activities.

  11. Electrical Collection and Transmission Systems for Offshore Wind Power: Preprint

    SciTech Connect (OSTI)

    Green, J.; Bowen, A.; Fingersh, L.J.; Wan, Y.

    2007-03-01

    The electrical systems needed for offshore wind farms to collect power from wind turbines--and transmit it to shore--will be a significant cost element of these systems. This paper describes the development of a simplified model of the cost and performance of such systems.

  12. Case Study: Mobile Photovoltaic System at Bechler Meadows Ranger Station, Yellowstone National Park (Brochure), Federal Energy Management Program (FEMP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mobile Photovoltaic System at Bechler Meadows Ranger Station, Yellowstone National Park Introduction This report describes the performance of a mobile photovoltaic (PV) system installed in 2011 to provide power to Bechler Ranger Station in Yellowstone National Park, Wyo. This small, remote outpost is not served by the electric utility grid and previously relied on a propane generator as the only source of power. Mobile Photovoltaic Systems Mobile solar systems consist of photovoltaic (PV)

  13. Fossil fuel combined cycle power system

    DOE Patents [OSTI]

    Labinov, Solomon Davidovich; Armstrong, Timothy Robert; Judkins, Roddie Reagan

    2006-10-10

    A system for converting fuel energy to electricity includes a reformer for converting a higher molecular weight gas into at least one lower molecular weight gas, at least one turbine to produce electricity from expansion of at least one of the lower molecular weight gases, and at least one fuel cell. The system can further include at least one separation device for substantially dividing the lower molecular weight gases into at least two gas streams prior to the electrochemical oxidization step. A nuclear reactor can be used to supply at least a portion of the heat the required for the chemical conversion process.

  14. ENHANCED THERMAL VACUUM TEST CAPABILITY FOR RADIOISOTOPE POWER SYSTEMS AT

    Office of Scientific and Technical Information (OSTI)

    THE IDAHO NATIONAL LABORATORY BETTER SIMULATES ENVIRONMENTAL CONDITIONS OF SPACE (Conference) | SciTech Connect Conference: ENHANCED THERMAL VACUUM TEST CAPABILITY FOR RADIOISOTOPE POWER SYSTEMS AT THE IDAHO NATIONAL LABORATORY BETTER SIMULATES ENVIRONMENTAL CONDITIONS OF SPACE Citation Details In-Document Search Title: ENHANCED THERMAL VACUUM TEST CAPABILITY FOR RADIOISOTOPE POWER SYSTEMS AT THE IDAHO NATIONAL LABORATORY BETTER SIMULATES ENVIRONMENTAL CONDITIONS OF SPACE The Idaho National

  15. Power Systems Design and Studies | Grid Modernization | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Design and Studies NREL develops new tools, algorithms, and methods for designing and studying the electric power system at all scales. This includes market design and performance evaluations; and planning, operations, and protection studies. Photo of two researchers looking at a screen showing a distribution grid map Current design and planning tools for the electric grid cannot handle uncertainty, rely on simplifying the underlying physics of power systems, and are typically run on desktop

  16. Software Configuration Management Plan (SCMP) version 1.1, Phase 1. Federal Emergency Management Information System (FEMIS): System platform

    SciTech Connect (OSTI)

    Strycker, F.E. Jr.

    1993-07-19

    This document is the Software Configuration Management Plan (SCMP) for the Federal Emergency Management Information System (FEMIS) project. FEMIS is an automated decision support system that integrates the planning and analysis, operations and response, and recovery phases of emergency management. It has broad application across the full range of emergency planning and operations. The SCMP will describe the configuration management system to be used for the control and maintenance of the software and associated documentation during development, test, and production of the FEMIS project. This plan provides information on the requirements and procedures necessary for the configuration management activities of FEMIS. It identifies the software configuration management requirements and establishes the methodology for generating configuration identifiers, controlling engineering changes, maintaining status accounting, and performing audits and reviews during the design and development of software configuration items. This plan defines the Software Configuration Management (SCM) activities necessary for maintaining all support software items and associated documentation being developed, procured, tested, sustained and kept in the production environment for FEMIS. It will apply to all phases of the software development life cycle, up to and including the time of delivery to the customer.

  17. Small space reactor power systems for unmanned solar system exploration missions

    SciTech Connect (OSTI)

    Bloomfield, H.S.

    1987-12-01

    A preliminary feasibility study of the application of small nuclear reactor space power systems to the Mariner Mark II Cassini spacecraft/mission was conducted. The purpose of the study was to identify and assess the technology and performance issues associated with the reactor power system/spacecraft/mission integration. The Cassini mission was selected because study of the Saturn system was identified as a high priority outer planet exploration objective. Reactor power systems applied to this mission were evaluated for two different uses. First, a very small 1 kWe reactor power system was used as an RTG replacement for the nominal spacecraft mission science payload power requirements while still retaining the spacecraft's usual bipropellant chemical propulsion system. The second use of reactor power involved the additional replacement of the chemical propulsion system with a small reactor power system and an electric propulsion system. The study also provides an examination of potential applications for the additional power available for scientific data collection. The reactor power system characteristics utilized in the study were based on a parametric mass model that was developed specifically for these low power applications. The model was generated following a neutronic safety and operational feasibility assessment of six small reactor concepts solicited from U.S. industry. This assessment provided the validation of reactor safety for all mission phases and generatad the reactor mass and dimensional data needed for the system mass model.

  18. Acquisition Guide, Chapter 42.16, Reporting Other Contractor Information into the Federal Awardee Performance and Integrity Information System

    Broader source: Energy.gov [DOE]

    The subject Acquisition Guide Chapter has the internal procedures for data entry to report other contractor information into the Federal Awardee Performance and Integrity Information System (FAPIIS). Other contractor information includes terminations for cause or default, defective cost or pricing data, determinations of non-responsibility, and administrative agreements for debarment or suspension.

  19. A High Efficiency PSOFC/ATS-Gas Turbine Power System

    SciTech Connect (OSTI)

    W.L. Lundberg; G.A. Israelson; M.D. Moeckel; S.E. Veyo; R.A. Holmes; P.R. Zafred; J.E. King; R.E. Kothmann

    2001-02-01

    A study is described in which the conceptual design of a hybrid power system integrating a pressurized Siemens Westinghouse solid oxide fuel cell generator and the Mercury{trademark} 50 gas turbine was developed. The Mercury{trademark} 50 was designed by Solar Turbines as part of the US. Department of Energy Advanced Turbine Systems program. The focus of the study was to develop the hybrid power system concept that principally would exhibit an attractively-low cost of electricity (COE). The inherently-high efficiency of the hybrid cycle contributes directly to achieving this objective, and by employing the efficient, power-intensive Mercury{trademark} 50, with its relatively-low installed cost, the higher-cost SOFC generator can be optimally sized such that the minimum-COE objective is achieved. The system cycle is described, major system components are specified, the system installed cost and COE are estimated, and the physical arrangement of the major system components is discussed. Estimates of system power output, efficiency, and emissions at the system design point are also presented. In addition, two bottoming cycle options are described, and estimates of their effects on overall-system performance, cost, and COE are provided.

  20. Lightning control system using high power microwave FEL

    SciTech Connect (OSTI)

    Shiho, M.; Watanbe, A.; Kawasaki, S.

    1995-12-31

    A research project for developing a thunder lightning control system using an induction linac based high power microwave free electron laser (FEL) started at JAERI The system will produce weakly ionized plasma rod in the atmosphere by high power microwaves and control a lightning path, away from , e. g., nuclear power stations and rocket launchers. It has been known that about MW/cm{sup 2} power density is enough for the atmospheric breakdown in the microwave region, and which means high power microwave FEL with GW level output power is feasible for atmospheric breakdown, and accordingly is feasible for thunder lightning control tool with making a conductive plasma channel in the atmosphere. From the microwave attenuation consideration in the atmosphere, FEL of 35GHz(0.13dB/km), 90GHz(0.35dB/km), 140GHz(1.7dB/km), and of 270 GHz(4.5dB/km) are the best candidates for the system. Comparing with other proposed lightning control system using visible or ultraviolet laser, the system using microwave has an advantage that microwave suffers smaller attenuation by rain or snow which always exist in the real atmospheric circumstances when lightning occurs.

  1. Integration of Uncertainty Information into Power System Operations

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Lu, Shuai; Samaan, Nader A.; Huang, Zhenyu; Subbarao, Krishnappa; Etingov, Pavel V.; Ma, Jian; Hafen, Ryan P.; Diao, Ruisheng; Lu, Ning

    2011-10-10

    Contemporary power systems face uncertainties coming from multiple sources, including forecast errors of load, wind and solar generation, uninstructed deviation and forced outage of traditional generators, loss of transmission lines, and others. With increasing amounts of wind and solar generation being integrated into the system, these uncertainties have been growing significantly. It is critical important to build knowledge of major sources of uncertainty, learn how to simulate them, and then incorporate this information into the decision-making processes and power system operations, for better reliability and efficiency. This paper gives a comprehensive view on the sources of uncertainty in power systems, important characteristics, available models, and ways of their integration into system operations. It is primarily based on previous works conducted at the Pacific Northwest National Laboratory (PNNL).

  2. Dynamics analyses of space power systems using the salt code

    SciTech Connect (OSTI)

    Geyer, H.K.; Bhattacharyya, S.K.; Hanan, N.A.; Livingston, J.M.; Westinghouse Electric Corp., Pittsburgh, PA )

    1989-01-01

    The dynamic behavior of large space power systems has been identified as a significant technical issue. To date several analyses of reactor kinetics have been reported in the literature, but there have been few (if any) studies of the dynamic response of the entire space power system. The problem is complex and required analytical methods are not generally available. Furthermore, given the conceptual state of current MMW space power systems designs, dynamic models of components are not generally available. We have used the SALT code to perform preliminary analyses of the startup and shutdown transients of several proposed MMW system designs. In this paper we will provide a description of the code methodology and present results of the analyses performed for the NERVA derivative reactor (NDR) system. 3 refs., 3 figs.

  3. Solid Oxide Fuel Cell Hybrid System for Distributed Power Generation

    SciTech Connect (OSTI)

    David Deangelis; Rich Depuy; Debashis Dey; Georgia Karvountzi; Nguyen Minh; Max Peter; Faress Rahman; Pavel Sokolov; Deliang Yang

    2004-09-30

    This report summarizes the work performed by Hybrid Power Generation Systems, LLC (HPGS) during the April to October 2004 reporting period in Task 2.3 (SOFC Scaleup for Hybrid and Fuel Cell Systems) under Cooperative Agreement DE-FC26-01NT40779 for the U. S. Department of Energy, National Energy Technology Laboratory (DOE/NETL), entitled ''Solid Oxide Fuel Cell Hybrid System for Distributed Power Generation''. This study analyzes the performance and economics of power generation systems for central power generation application based on Solid Oxide Fuel Cell (SOFC) technology and fueled by natural gas. The main objective of this task is to develop credible scale up strategies for large solid oxide fuel cell-gas turbine systems. System concepts that integrate a SOFC with a gas turbine were developed and analyzed for plant sizes in excess of 20 MW. A 25 MW plant configuration was selected with projected system efficiency of over 65% and a factory cost of under $400/kW. The plant design is modular and can be scaled to both higher and lower plant power ratings. Technology gaps and required engineering development efforts were identified and evaluated.

  4. Advanced Power Electronic Interfaces for Distributed Energy Systems Part 1: Systems and Topologies

    SciTech Connect (OSTI)

    Kramer, W.; Chakraborty, S.; Kroposki, B.; Thomas, H.

    2008-03-01

    This report summarizes power electronic interfaces for DE applications and the topologies needed for advanced power electronic interfaces. It focuses on photovoltaic, wind, microturbine, fuel cell, internal combustion engine, battery storage, and flywheel storage systems.

  5. Protective, Modular Wave Power Generation System

    SciTech Connect (OSTI)

    Vvedensky, Jane M.; Park, Robert Y.

    2012-11-27

    The concept of small wave energy conversion modules that can be built into large, scalable arrays, in the same vein as solar panels, has been developed. This innovation lends itself to an organic business and development model, and enables the use of large-run manufacturing technology to reduce system costs. The first prototype module has been built to full-scale, and tested in a laboratory wave channel. The device has been shown to generate electricity and dissipate wave energy. Improvements need to be made to the electrical generator and a demonstration of an array of modules should be made in natural conditions.

  6. Active high-power RF switch and pulse compression system

    DOE Patents [OSTI]

    Tantawi, Sami G.; Ruth, Ronald D.; Zolotorev, Max

    1998-01-01

    A high-power RF switching device employs a semiconductor wafer positioned in the third port of a three-port RF device. A controllable source of directed energy, such as a suitable laser or electron beam, is aimed at the semiconductor material. When the source is turned on, the energy incident on the wafer induces an electron-hole plasma layer on the wafer, changing the wafer's dielectric constant, turning the third port into a termination for incident RF signals, and. causing all incident RF signals to be reflected from the surface of the wafer. The propagation constant of RF signals through port 3, therefore, can be changed by controlling the beam. By making the RF coupling to the third port as small as necessary, one can reduce the peak electric field on the unexcited silicon surface for any level of input power from port 1, thereby reducing risk of damaging the wafer by RF with high peak power. The switch is useful to the construction of an improved pulse compression system to boost the peak power of microwave tubes driving linear accelerators. In this application, the high-power RF switch is placed at the coupling iris between the charging waveguide and the resonant storage line of a pulse compression system. This optically controlled high power RF pulse compression system can handle hundreds of Megawatts of power at X-band.

  7. PowerPoint Presentation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Columbia River Power System (FCRPS) FY 2013 THIRD QUARTER REVIEW Net Revenues and Reserves July 26, 2013 Projection for FY 2013 Page 2 This information has been made...

  8. NSTX Protection And Interlock Systems For Coil And Powers Supply Systems

    SciTech Connect (OSTI)

    X. Zhao, S. Ramakrishnan, J. Lawson, C.Neumeyer, R. Marsala, H. Schneider, Engineering Operations

    2009-09-24

    NSTX at Princeton Plasma Physics Laboratory (PPPL) requires sophisticated plasma positioning control system for stable plasma operation. TF magnetic coils and PF magnetic coils provide electromagnetic fields to position and shape the plasma vertically and horizontally respectively. NSTX utilizes twenty six coil power supplies to establish and initiate electromagnetic fields through the coil system for plasma control. A power protection and interlock system is utilized to detect power system faults and protect the TF coils and PF coils against excessive electromechanical forces, overheating, and over current. Upon detecting any fault condition the power system is restricted, and it is either prevented from initializing or suppressed to de-energize coil power during pulsing. Power fault status is immediately reported to the computer system. This paper describes the design and operation of NSTX's protection and interlocking system and possible future expansion.

  9. NASA low power DIPS [Dynamic Isotope Power System] conceptual design requirements document

    SciTech Connect (OSTI)

    Johnson, G.; Determan, W.; Otting, W.

    1990-01-01

    This document describes the requirements for a low power (0.5--1.0 kwe) Dynamic Isotope Power System (DIPS) for interplanetary and space exploration missions using the Mariner Mark II spacecraft. The reference mission used to establish these requirements was the Cassini orbiter mission to Saturn. Requirements specific to two other missions (Outer Planet Orbiter/Probe and Comet Nucleus Sample Return) are also included. A list of references used to develop these requirements is provided. 17 refs., 2 figs., 2 tabs.

  10. Power Systems of the Future: A 21st Century Power Partnership Thought Leadership Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AC36-08GO28308 Technical Report NREL/TP-6A20-62611 February 2015 Power Systems of the Future A 21 st Century Power Partnership Thought Leadership Report Owen Zinaman, Mackay Miller, Ali Adil, Douglas Arent, Jaquelin Cochran, and Ravi Vora National Renewable Energy Laboratory Sonia Aggarwal Energy Innovation: Policy and Technology LLC Minnesh Bipath South Africa National Energy Development Institute Carl Linvill Regulatory Assistance Project Ari David Columbia University Business School Richard

  11. Probabilistic Density Function Method for Stochastic ODEs of Power Systems with Uncertain Power Input

    SciTech Connect (OSTI)

    Wang, Peng; Barajas-Solano, David A.; Constantinescu, Emil; Abhyankar, S.; Ghosh, Donetta L.; Smith, Barry; Huang, Zhenyu; Tartakovsky, Alexandre M.

    2015-09-22

    Wind and solar power generators are commonly described by a system of stochastic ordinary differential equations (SODEs) where random input parameters represent uncertainty in wind and solar energy. The existing methods for SODEs are mostly limited to delta-correlated random parameters (white noise). Here we use the Probability Density Function (PDF) method for deriving a closed-form deterministic partial differential equation (PDE) for the joint probability density function of the SODEs describing a power generator with time-correlated power input. The resulting PDE is solved numerically. A good agreement with Monte Carlo Simulations shows accuracy of the PDF method.

  12. Wind Power Forecasting Error Frequency Analyses for Operational Power System Studies: Preprint

    SciTech Connect (OSTI)

    Florita, A.; Hodge, B. M.; Milligan, M.

    2012-08-01

    The examination of wind power forecasting errors is crucial for optimal unit commitment and economic dispatch of power systems with significant wind power penetrations. This scheduling process includes both renewable and nonrenewable generators, and the incorporation of wind power forecasts will become increasingly important as wind fleets constitute a larger portion of generation portfolios. This research considers the Western Wind and Solar Integration Study database of wind power forecasts and numerical actualizations. This database comprises more than 30,000 locations spread over the western United States, with a total wind power capacity of 960 GW. Error analyses for individual sites and for specific balancing areas are performed using the database, quantifying the fit to theoretical distributions through goodness-of-fit metrics. Insights into wind-power forecasting error distributions are established for various levels of temporal and spatial resolution, contrasts made among the frequency distribution alternatives, and recommendations put forth for harnessing the results. Empirical data are used to produce more realistic site-level forecasts than previously employed, such that higher resolution operational studies are possible. This research feeds into a larger work of renewable integration through the links wind power forecasting has with various operational issues, such as stochastic unit commitment and flexible reserve level determination.

  13. Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System Inc.: Federal Register Notice Volume 70, No. 33- Feb. 18, 2005

    Broader source: Energy.gov [DOE]

    Application from Sea Breeze Pacific Regional Transmission System Inc to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. - Federal Register Notice

  14. Application to export electric energy OE Docket No. EA-227-A New York Independent System Operator, Inc: Federal Register Notice Volume 66, No. 231- Nov. 30, 2001

    Broader source: Energy.gov [DOE]

    Application from New York Independent System Operator, Inc to export electric energy to Canada. Federal Register Notice Vol 66 No 231

  15. THYME: Toolkit for Hybrid Modeling of Electric Power Systems

    Energy Science and Technology Software Center (OSTI)

    2011-01-01

    THYME is an object oriented library for building models of wide area control and communications in electric power systems. This software is designed as a module to be used with existing open source simulators for discrete event systems in general and communication systems in particular. THYME consists of a typical model for simulating electro-mechanical transients (e.g., as are used in dynamic stability studies), data handling objects to work with CDF and PTI formatted power flowmore » data, and sample models of discrete sensors and controllers.« less

  16. Power control system for a hot gas engine

    DOE Patents [OSTI]

    Berntell, John O.

    1986-01-01

    A power control system for a hot gas engine of the type in which the power output is controlled by varying the mean pressure of the working gas charge in the engine has according to the present invention been provided with two working gas reservoirs at substantially different pressure levels. At working gas pressures below the lower of said levels the high pressure gas reservoir is cut out from the control system, and at higher pressures the low pressure gas reservoir is cut out from the system, thereby enabling a single one-stage compressor to handle gas within a wide pressure range at a low compression ratio.

  17. Transactions of the fifth symposium on space nuclear power systems

    SciTech Connect (OSTI)

    El-Genk, M.S.; Hoover, M.D.

    1988-01-01

    This paper contains the presented papers at the fourth symposium on space nuclear power systems. Topics of these paper include: space nuclear missions and applications, reactors and shielding, nuclear electric and nuclear propulsion, high-temperature materials, instrumentation and control, energy conversion and storage, space nuclear fuels, thermal management, nuclear safety, simulation and modeling, and multimegawatt system concepts. (LSP)

  18. Transactions of the fourth symposium on space nuclear power systems

    SciTech Connect (OSTI)

    El-Genk, M.S.; Hoover, M.D.

    1987-01-01

    This paper contains the presented papers at the fourth symposium on space nuclear power systems. Topics of these papers include: space nuclear missions and applications, reactors and shielding, nuclear electric and nuclear propulsion, refractory alloys and high-temperature materials, instrumentation and control, energy conversion and storage, space nuclear fuels, thermal management, nuclear safety, simulation and modeling, and multimegawatt system concepts. (LSP)

  19. ASSESSMENT OF COMBINED HEAT AND POWER SYSTEM"PREMIUM POWER" APPLICATIONS IN CALIFORNIA

    SciTech Connect (OSTI)

    Norwood, Zack; Lipman, Timothy; Stadler, Michael; Marnay, Chris

    2010-06-01

    The effectiveness of combined heat and power (CHP) systems for power interruption intolerant,"premium power," facilities is the focus of this study. Through three real-world case studies and economic cost minimization modeling, the economic and environmental performance of"premium power" CHP is analyzed. The results of the analysis for a brewery, data center, and hospital lead to some interesting conclusions about CHP limited to the specific CHP technologies installed at those sites. Firstly, facilities with high heating loads prove to be the most appropriate for CHP installations from a purely economic standpoint. Secondly, waste heat driven thermal cooling systems are only economically attractive if the technology for these chillers can increase above the current best system efficiency. Thirdly, if the reliability of CHP systems proves to be as high as diesel generators they could replace these generators at little or no additional cost if the thermal to electric (relative) load of those facilities was already high enough to economically justify a CHP system. Lastly, in terms of greenhouse gas emissions, the modeled CHP systems provide some degree of decreased emissions, estimated at approximately 10percent for the hospital, the application with the highest relative thermal load in this case

  20. Parallel Computing Environments and Methods for Power Distribution System Simulation

    SciTech Connect (OSTI)

    Lu, Ning; Taylor, Zachary T.; Chassin, David P.; Guttromson, Ross T.; Studham, Scott S.

    2005-11-10

    The development of cost-effective high-performance parallel computing on multi-processor super computers makes it attractive to port excessively time consuming simulation software from personal computers (PC) to super computes. The power distribution system simulator (PDSS) takes a bottom-up approach and simulates load at appliance level, where detailed thermal models for appliances are used. This approach works well for a small power distribution system consisting of a few thousand appliances. When the number of appliances increases, the simulation uses up the PC memory and its run time increases to a point where the approach is no longer feasible to model a practical large power distribution system. This paper presents an effort made to port a PC-based power distribution system simulator (PDSS) to a 128-processor shared-memory super computer. The paper offers an overview of the parallel computing environment and a description of the modification made to the PDSS model. The performances of the PDSS running on a standalone PC and on the super computer are compared. Future research direction of utilizing parallel computing in the power distribution system simulation is also addressed.

  1. Electric vehicle system for charging and supplying electrical power

    DOE Patents [OSTI]

    Su, Gui Jia

    2010-06-08

    A power system that provides power between an energy storage device, an external charging-source/load, an onboard electrical power generator, and a vehicle drive shaft. The power system has at least one energy storage device electrically connected across a dc bus, at least one filter capacitor leg having at least one filter capacitor electrically connected across the dc bus, at least one power inverter/converter electrically connected across the dc bus, and at least one multiphase motor/generator having stator windings electrically connected at one end to form a neutral point and electrically connected on the other end to one of the power inverter/converters. A charging-sourcing selection socket is electrically connected to the neutral points and the external charging-source/load. At least one electronics controller is electrically connected to the charging-sourcing selection socket and at least one power inverter/converter. The switch legs in each of the inverter/converters selected by the charging-source/load socket collectively function as a single switch leg. The motor/generators function as an inductor.

  2. Thermoelectrics: From Space Power Systems to Terrestrial Waste Heat

    Broader source: Energy.gov (indexed) [DOE]

    Recovery Applications | Department of Energy Progress in reliable high temperature segmented thermoelectric devices and potential for producing electricity from waste heat from energy intensive industrial processes and transportation vehicles exhaust are discussed fluerial.pdf (3.11 MB) More Documents & Publications Thermoelectrics: From Space Power Systems to Terrestrial Waste Heat Recovery Applications High Reliability, High TemperatureThermoelectric Power Generation Materials and

  3. BIOMASS GASIFICATION AND POWER GENERATION USING ADVANCED GAS TURBINE SYSTEMS

    SciTech Connect (OSTI)

    David Liscinsky

    2002-10-20

    A multidisciplined team led by the United Technologies Research Center (UTRC) and consisting of Pratt & Whitney Power Systems (PWPS), the University of North Dakota Energy & Environmental Research Center (EERC), KraftWork Systems, Inc. (kWS), and the Connecticut Resource Recovery Authority (CRRA) has evaluated a variety of gasified biomass fuels, integrated into advanced gas turbine-based power systems. The team has concluded that a biomass integrated gasification combined-cycle (BIGCC) plant with an overall integrated system efficiency of 45% (HHV) at emission levels of less than half of New Source Performance Standards (NSPS) is technically and economically feasible. The higher process efficiency in itself reduces consumption of premium fuels currently used for power generation including those from foreign sources. In addition, the advanced gasification process can be used to generate fuels and chemicals, such as low-cost hydrogen and syngas for chemical synthesis, as well as baseload power. The conceptual design of the plant consists of an air-blown circulating fluidized-bed Advanced Transport Gasifier and a PWPS FT8 TwinPac{trademark} aeroderivative gas turbine operated in combined cycle to produce {approx}80 MWe. This system uses advanced technology commercial products in combination with components in advanced development or demonstration stages, thereby maximizing the opportunity for early implementation. The biofueled power system was found to have a levelized cost of electricity competitive with other new power system alternatives including larger scale natural gas combined cycles. The key elements are: (1) An Advanced Transport Gasifier (ATG) circulating fluid-bed gasifier having wide fuel flexibility and high gasification efficiency; (2) An FT8 TwinPac{trademark}-based combined cycle of approximately 80 MWe; (3) Sustainable biomass primary fuel source at low cost and potentially widespread availability-refuse-derived fuel (RDF); (4) An overall integrated

  4. Advanced Soldier Thermoelectric Power System for Power Generation from Battlefield Heat Sources

    SciTech Connect (OSTI)

    Hendricks, Terry J.; Hogan, Tim; Case, Eldon D.; Cauchy, Charles J.

    2010-09-01

    The U.S. military uses large amounts of fuel during deployments and battlefield operations. This project sought to develop a lightweight, small form-factor, soldier-portable advanced thermoelectric (TE) system prototype to recover and convert waste heat from various deployed military equipment (i.e., diesel generators/engines, incinerators, vehicles, and potentially mobile kitchens), with the ultimate purpose of producing power for soldier battery charging, advanced capacitor charging, and other battlefield power applications. The technical approach employed microchannel technology, a unique “power panel” approach to heat exchange/TE system integration, and newly-characterized LAST (lead-antimony-silver-telluride) and LASTT (lead-antimony-silver-tin-telluride) TE materials segmented with bismuth telluride TE materials in designing a segmented-element TE power module and system. This project researched never-before-addressed system integration challenges (thermal expansion, thermal diffusion, electrical interconnection, thermal and electrical interfaces) of designing thin “power panels” consisting of alternating layers of thin, microchannel heat exchangers (hot and cold) sandwiching thin, segmented-element TE power generators. The TE properties, structurally properties, and thermal fatigue behavior of LAST and LASTT materials were developed and characterized such that the first segmented-element TE modules using LAST / LASTT materials were fabricated and tested at hot-side temperatures = 400 °C and cold-side temperatures = 40 °C. LAST / LASTT materials were successfully segmented with bismuth telluride and electrically interconnected with diffusion barrier materials and copper strapping within the module electrical circuit. A TE system design was developed to produce 1.5-1.6 kW of electrical energy using these new TE modules from the exhaust waste heat of 60-kW Tactical Quiet Generators as demonstration vehicles.

  5. Detection of forced oscillations in power systems with multichannel methods

    SciTech Connect (OSTI)

    Follum, James D.

    2015-09-30

    The increasing availability of high fidelity, geographically dispersed measurements in power systems improves the ability of researchers and engineers to study dynamic behaviors in the grid. One such behavior that is garnering increased attention is the presence of forced oscillations. Power system engineers are interested in forced oscillations because they are often symptomatic of the malfunction or misoperation of equipment. Though the resulting oscillation is not always large in amplitude, the root cause may be serious. In this report, multi-channel forced oscillation detection methods are developed. These methods leverage previously developed detection approaches based on the periodogram and spectral-coherence. Making use of geographically distributed channels of data is shown to improved detection performance and shorten the delay before an oscillation can be detected in the online environment. Results from simulated and measured power system data are presented.

  6. U.S. - Canada Power System Outage Task Force: Final Report on...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Canada Power System Outage Task Force: Final Report on the Implementation of Task Force Recommendations U.S. - Canada Power System Outage Task Force: Final Report on the ...

  7. Ocean Power Technologies (TRL 7 8 System) - Reedsport PB150 Deployment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 8 System) - Reedsport PB150 Deployment and Ocean Test Project Ocean Power Technologies (TRL 7 8 System) - Reedsport PB150 Deployment and Ocean Test Project Ocean Power ...

  8. Equivalencing the Collector System of a Large Wind Power Plant: Preprint

    SciTech Connect (OSTI)

    Muljadi, E.; Butterfield, C. P.; Ellis, A.; Mechenbier, J.; Hochheimer, J.; Young, R.; Miller, N.; Delmerico, R.; Zavadil, R.; Smith, J. C.

    2006-01-01

    This paper focuses on our effort to develop an equivalent representation of a wind power plant collector system for power system planning studies.

  9. Beijing F Y Hyenergy Power System Co Ltd | Open Energy Information

    Open Energy Info (EERE)

    Y Hyenergy Power System Co Ltd Jump to: navigation, search Name: Beijing F.Y. Hyenergy Power System Co Ltd Place: Beijing, Beijing Municipality, China Zip: 100176 Product:...

  10. Superior Valley photovoltaic power processing and system controller evaluation

    SciTech Connect (OSTI)

    Bonn, R.; Ginn, J.; Zirzow, J.; Sittler, G.

    1995-11-01

    Sandia National Laboratories, sponsored by the US Department of Energy`s Office of Energy Management, conducts the photovoltaic balance-of-system program. Under this program, Sandia supports the Department of Defense Strategic Environmental Research Development Plan, SERDP, which is advancing the use of photovoltaics in operational DoD facilities. This report details the acceptance testing of the first of these photovoltaic hybrid systems: the Superior Valley photovoltaic-diesel hybrid system. This is the first of several photovoltaic installations for the Department of Defense. The system hardware tested at Sandia included an inverter, maximum power trackers, and a system controller.

  11. Automated Surface Observing System: Standby Power Options | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Automated Surface Observing System: Standby Power Options Automated Surface Observing System: Standby Power Options This presentation by Anthony Leonardo of the National Weather Service was given at the Fuel Cell Meeting in April 2007. fuel_cell_mtng_leonardo.pdf (323.76 KB) More Documents & Publications Dominion Cove Point LNG, LP - FE Dkt. No 11-128-LNG Order 3331-A: Dominion Cove Point LNG, LP - Dk. No. 11-128-LNG Market Transformation: Fuel Cell Early Adoption (Presentation)

  12. Reliability analysis for LEB ring magnet power system in SSC

    SciTech Connect (OSTI)

    Smedley, K.

    1991-11-01

    The LEB ring magnet power system contains six subsystems, supervisory control, power supplies, regulation, DC bus, resonant cells, and fault sensing network. The system availability of the total LEB RMPS is required to be 0.999. The work in this paper is to allocate the overall LEB RMPS reliability requirement into reliability requirements for each of the subsystems and lower-tier items. The Feasibility-of-Objective technique combining with engineering experience is the key for the allocation. MIL-HDBK-217F is used to derate SCR components. 7 refs., 5 figs.

  13. Power System Extreme Event Detection: The VulnerabilityFrontier

    SciTech Connect (OSTI)

    Lesieutre, Bernard C.; Pinar, Ali; Roy, Sandip

    2007-10-17

    In this work we apply graph theoretic tools to provide aclose bound on a frontier relating the number of line outages in a gridto the power disrupted by the outages. This frontier describes theboundary of a space relating the possible severity of a disturbance interms of power disruption, from zero to some maximum on the boundary, tothe number line outages involved in the event. We present the usefulnessof this analysis with a complete analysis of a 30 bus system, and presentresults for larger systems.

  14. Power-cable-carrier control (PC/sup 3/) system

    SciTech Connect (OSTI)

    Alvis, R.L.; Wally, K.; Rosborough, J.R.

    1981-04-01

    A control system has been developed that uses a carrier signal imposed on an existing ac power circuit to transmit commands. This system was specifically developed to control an entire solar collector field by sending sun-tracking information to the trough collectors or by commanding them to assume safe positions (STOW) if out-of-limit conditions were encountered. Objectives were to develop a control system that operates reliably and has enough functions to control an entire collector field, yet do it at less cost than for conventional approaches. Development, design, operating characteristics, and field testing and results of the new system, the Power Cable Carrier Control (PC/sup 3/) System are described.

  15. Inertial confinement fusion reaction chamber and power conversion system study

    SciTech Connect (OSTI)

    Maya, I.; Schultz, K.R.; Battaglia, J.M.; Buksa, J.J.; Creedson, R.L.; Erlandson, O.D.; Levine, H.E.; Roelant, D.F.; Sanchez, H.W.; Schrader, S.A.

    1984-09-01

    GA Technologies has developed a conceptual ICF reactor system based on the Cascade rotating-bed reaction chamber concept. Unique features of the system design include the use of low activation SiC in a reaction chamber constructed of box-shaped tiles held together in compression by prestressing tendons to the vacuum chamber. Circulating Li/sub 2/O granules serve as the tritium breeding and energy transport material, cascading down the sides of the reaction chamber to the power conversion system. The total tritium inventory of the system is 6 kg; tritium recovery is accomplished directly from the granules via the vacuum system. A system for centrifugal throw transport of the hot Li/sub 2/O granules from the reaction chamber to the power conversion system has been developed. A number of issues were evaluated during the course of this study. These include the response of first-layer granules to the intense microexplosion surface heat flux, cost effective fabrication of Li/sub 2/O granules, tritium inventory and recovery issues, the thermodynamics of solids-flow options, vacuum versus helium-medium heat transfer, and the tradeoffs of capital cost versus efficiency for alternate heat exchange and power conversion system option. The resultant design options appear to be economically competitive, safe, and environmentally attractive.

  16. Wind power interconnection into the power system: a review of grid code requirements

    SciTech Connect (OSTI)

    Singh, Bharat; Singh, S.N.

    2009-06-15

    The burgeoning wind sector, and its increasing influence on the operation and control of power systems, has made grid integration a key recent concern. Different countries are taking different approaches in setting up new grid codes to address this issue. (author)

  17. Technology verification phase. Dynamic isotope power system. Final report

    SciTech Connect (OSTI)

    Halsey, D.G.

    1982-03-10

    The Phase I requirements of the Kilowatt Isotope Power System (KIPS) program were to make a detailed Flight System Conceptual Design (FSCD) for an isotope fueled organic Rankine cycle power system and to build and test a Ground Demonstration System (GDS) which simulated as closely as possible the operational characteristics of the FSCD. The activities and results of Phase II, the Technology Verification Phase, of the program are reported. The objectives of this phase were to increase system efficiency to 18.1% by component development, to demonstrate system reliability by a 5000 h endurance test and to update the flight system design. During Phase II, system performance was improved from 15.1% to 16.6%, an endurance test of 2000 h was performed while the flight design analysis was limited to a study of the General Purpose Heat Source, a study of the regenerator manufacturing technique and analysis of the hardness of the system to a laser threat. It was concluded from these tests that the GDS is basically prototypic of a flight design; all components necessary for satisfactory operation were demonstrated successfully at the system level; over 11,000 total h of operation without any component failure attested to the inherent reliability of this type of system; and some further development is required, specifically in the area of performance. (LCL)

  18. Frequency Control Concerns in the North American Electric Power System

    SciTech Connect (OSTI)

    Kirby, B.J.

    2003-03-26

    This paper examines the relationship between system frequency, reliability and markets. It was prompted by the frequency deviations recently experienced at 2200 hours daily but is more generally concerned with the question of what frequency control is necessary. The paper does not provide new information or document new research. Nor is it intended to educate readers concerning power system engineering. Instead, the purpose is to reexamine well known truths concerning the power system and to freshly explore the basic relationship between frequency, reliability and markets: stepping back, if you will, to see if we are collectively missing something. The concern of this paper is with frequency and reliability. Off-nominal frequency can impact reliability and markets efficiency (as we are using the term here) in four ways. It could damage equipment (generation, transmission, or load). It could degrade the quality of the product being delivered to end users (too low and lights would flicker unacceptably, for example). It could result in the collapse of the power system itself (by triggering protective system actions, for example). Or it could result in overloading transmission lines as various generators try to restore system frequency impacting markets efficiency. Often these causes operate in concert. Generator protective systems take action to prevent generator damage, for example, but exacerbate the overall generation/load imbalance. The paper is divided into two sections. The Introduction is followed by a section titled ''A Perspective on Frequency Control'' which addresses the physical requirements of the power system and how market transactions interact with the physical system. The ''Frequency Standards and Control Performance'' section discusses the various NERC and regional reliability council policies that govern utility performance and how these relate to frequency and reliability. Finally, Conclusions are provided.

  19. Southwestern Power Administration One West Third Street

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AND APPROVING INTEGRATED SYSTEM POWER RATES ON A FINAL BASIS You are hereby notified, in accordance with the terms and conditions of our power sales contract, that the Federal ...

  20. Mitigation of magnetohydrodynamic electromagnetic pulse (MHD-EMP) effects from commerical electric power systems. Power Systems Technology Program

    SciTech Connect (OSTI)

    Barnes, P.R.; Tesche, F.M.; Vance, E.F.

    1992-03-01

    A large nuclear detonation at altitudes of several hundred kilometers above the earth distorts the earth`s magnetic field and produces a strong magnetohydrodynamic electromagnetic pulse (MHD-EMP). This can adversely affect electrical power systems. In this report, the effects of this nuclear environment on critical facilities connected to the commercial power system are considered. Methods of mitigating the MHD-EMP impacts are investigated, and recommended protection schemes are presented. Guidelines for testing facilities to determine the effects of MHD-EMP and to validate the mitigation methods also are discussed.