Sample records for federal government provide

  1. Federal Government Resources- Tribal Communities

    Broader source: Energy.gov [DOE]

    The federal government recognizes tribal nations as "domestic dependent nations" and has established a number of laws attempting to clarify the government to government relationship between the...

  2. Federal Government Energy Management Conservation Programs Reports...

    Office of Environmental Management (EM)

    Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal...

  3. Doing Business with the Federal Government (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-06-01T23:59:59.000Z

    To do business with the Federal Government, it is best to target the appropriate program. This document outlines resources for doing business with the Federal Government.

  4. Federal Government Increases Renewable Energy Use Over 1000 Percent...

    Office of Environmental Management (EM)

    Government Increases Renewable Energy Use Over 1000 Percent since 1999; Exceeds Goal Federal Government Increases Renewable Energy Use Over 1000 Percent since 1999; Exceeds Goal...

  5. Energy Department Sends First Energy Saving Team to Federal Government...

    Office of Environmental Management (EM)

    Sends First Energy Saving Team to Federal Government Site in Jamaica, N.Y. Energy Department Sends First Energy Saving Team to Federal Government Site in Jamaica, N.Y. October 27,...

  6. CHP Education and Outreach Guide to State and Federal Government...

    Broader source: Energy.gov (indexed) [DOE]

    representatives in the states and the federal government about combined heat and power (CHP). It was compiled in October 2000 and updated October 2005. chpeducationandoutreach...

  7. John Hale III Awarded Minority Federal Government Public Servant...

    Office of Environmental Management (EM)

    awarded John Hale III, Director of the U.S. Department of Energy's Office of Small Business and disadvantage Utilization, the National Minority Federal Government Public Servant...

  8. Request for Information: Federal Government Power Purchase Agreements...

    Broader source: Energy.gov (indexed) [DOE]

    request for information for federal government power purchase agreement (PPA) issues. pparfi.pdf More Documents & Publications Response Summary: Department of Energy Power...

  9. Energy Goals and Standards for Federal Government

    Broader source: Energy.gov [DOE]

    The federal Energy Policy Act of 2005 (EPAct 2005) established several goals and standards to reduce energy use in existing and new federal buildings. Executive Order 13423, signed in January 2007...

  10. Annual Federal Government Energy Use and Costs by Agency, 1975...

    Open Energy Info (EERE)

    Annual Federal Government Energy Use and Costs by Agency, 1975 - 2012 Data set presents historical energy use in native units and billion site-delivered Btu and costs (in 2012...

  11. Federal government information handbook: formerly utilized sites remedial action program

    SciTech Connect (OSTI)

    Not Available

    1980-12-31T23:59:59.000Z

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.

  12. Suggested drilling research tasks for the Federal Government

    SciTech Connect (OSTI)

    Carson, C.C.

    1984-04-01T23:59:59.000Z

    A brief summary discussion of drilling, drilling research and the role of the government in drilling research is presented. Specific research and development areas recommended for federal consideration are listed. The technical nature of the identified tasks is emphasized. The Appendices present the factual basis for the discussion and recommendations. Numerous references are noted in the Appendices.

  13. Annual report to Congress on Federal Government Energy Management and Conservation Programs

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    This report on Federal Energy Management for Fiscal year (FY) 1992 provides information on energy consumption in Federal buildings and operations and documents activities conducted by Federal agencies to meet the statutory requirements of Title V, Part 3, of the National Energy Conservation Policy Act (NECPA), as amended, 42 U.S.C. 8251-8261, and Title VIII of NECPA, 42 U.S.C. 8287-8287b. This report also describes the energy conservation and management activities of the Federal Government under the authorization of section 381 of the Energy Policy and Conservation Act (EPCA), as amended, 42 U.S.C. 6361. Implementation activities undertaken during FY 1992 by the Federal agencies under Executive Order 12759 on Federal Energy Management are also described in this report.

  14. Annual report to Congress on Federal Government energy management and conservation programs, Fiscal year 1994

    SciTech Connect (OSTI)

    NONE

    1995-10-06T23:59:59.000Z

    This report provides sinformation on energy consumption in Federal buildings and operations and documents activities conducted by Federal agencies to meet statutory requirements of the National Energy Conservation Policy Act. It also describes energy conservation and management activities of the Federal Government under section 381 of the Energy Policy and Conservation Act. Implementation activities undertaken during FY94 by the Federal agencies under the Energy Policy Act of 1992 and Executive Orders 12759 and 12902 are also described. During FY94, total (gross) energy consumption of the US Government, including energy consued to produce, process, and transport energy, was 1.72 quadrillion Btu. This represents {similar_to}2.0% of the total 85.34 quads used in US.

  15. U.S. Federal Government- Green Power Purchasing Goal

    Broader source: Energy.gov [DOE]

    The federal Energy Policy Act of 2005 (EPAct 2005) extended and expanded several previous goals and standards to reduce energy use in existing and new federal buildings. Section 203 of EPAct 2005...

  16. Solar Photovoltaic Financing: Deployment by Federal Government Agencies

    SciTech Connect (OSTI)

    Cory, K.; Coggeshall, C.; Coughlin, J.; Kreycik, C.

    2009-07-01T23:59:59.000Z

    The goal of this report is to examine how federal agencies can finance on-site PV projects. It explains state-level cash incentives available, the importance of solar renewable energy certificate revenues (in certain markets), existing financing structures, as well as innovative financing structures being used by federal agencies to deploy on-site PV. Specific examples from the DOD, DOE, and other federal agencies are highlighted to explain federal project financing in detail.

  17. Report to Congress on the Progress of the Federal Government...

    Broader source: Energy.gov (indexed) [DOE]

    Report describes the compliance of federal agencies with Section 203 of the Energy Policy Act of 2005. 2008epactsec203report.pdf More Documents & Publications Renewable Energy...

  18. Information for the NIH Extramural Grantee Community During the Lapse of Federal Government Funding

    E-Print Network [OSTI]

    Kroll, Kristen L.

    Information for the NIH Extramural Grantee Community During the Lapse of Federal Government Funding and a Notice in the NIH Guide Page 1 of 4NOT-OD-13-126: Information for the NIH Extramural Grantee Community

  19. Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1997

    SciTech Connect (OSTI)

    none,

    1999-08-13T23:59:59.000Z

    In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1997.

  20. Annual report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1998

    SciTech Connect (OSTI)

    none,

    2000-03-20T23:59:59.000Z

    In fulfillment of statutory requirements, this report provides information on energy consumption in Federal buildings and operations and also documents activities conducted by Federal agencies in fulfilling those requirements during Fiscal Year 1998.

  1. Federal Government Increases Renewable Energy Use Over 1000 Percent since

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6Awards » FederalFinanceEnergy1999;

  2. Engaging Hispanic Leadership in the Federal Government | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 FederalTexas Energyof 2005 atDepartment ofLLC ||Efficiency Programs

  3. Federal Government Support for Fuel Cell Technologies | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721Energy 3_adv_battery.pdf MoreEnergy Government Support for Fuel Cell

  4. Federal Government's Energy Consumption Lowest in Almost 40 Years |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721Energy 3_adv_battery.pdf MoreEnergy Government Support for Fuel

  5. How the Federal Government Reimburses Long Term Services and Supports

    E-Print Network [OSTI]

    van den Berg, Jur

    organization (MCO) on a PMPM basis MCO makes fee-for-service payment to provider A MCO make perspective payment

  6. Wind Energy Opportunities, Challenges, and Progress Within the Federal Government (Poster)

    SciTech Connect (OSTI)

    Robichaud, R.

    2009-05-01T23:59:59.000Z

    Wind Powering America (WPA) works with Federal agencies to increase their understanding of wind resources and assessment; facilitate project development activities through Met tower loans, wind data analysis, and technical assistance; and provide advice on RFP development and financing options. This poster provides an overview of WPA's activities with the federal sector.

  7. Energy Smart Federal Partnership: Partnering to Provide Technical Assistance, Financial Incentives, and More

    Broader source: Energy.gov [DOE]

    Presentation covers technical and financial incentives for the Energy Smart Federal Partnership and is given at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  8. The greening of the Federal Government: Creating energy and environmental showcases

    SciTech Connect (OSTI)

    Hunt, D.M.; McCauley, D.

    1997-06-01T23:59:59.000Z

    President Clinton announced the first Federal {open_quotes}greening{close_quotes} project on April 22, 1993 - the Greening of the White House. The main objective of this initiative was to create an energy and environmental showcase for all sectors of American society to view and emulate. In addition, the Greening of the White House {open_quotes}highlights practical steps that homeowners and business people can take to benefit the environment, save money, and improve the comfort of their surroundings{close_quotes}. Since then significant progress has been made at the White House to achieve this goal. In addition, several other Federal facilities have begun similar initiatives: The Department of Energy (DOE) Headquarters, the Presidio, the Pentagon, and the Grand Canyon and Yellowstone National Parks. The concept of greening recognizes that energy, environment, and economics are critical components to be considered in optimizing the operation of a building. These practices should be incorporated at the start of the building design phase and continue throughout the building`s operating life. Greening involves the selection and integration of technologies that cost effectively reduce energy consumption while providing an equal or greater level service, and the implementation of policies and practices that emphasize reducing material use, recycling, and reusing materials. Of great interest to the greening process is the potential impact on worker productivity as improvements in occupant comfort are thought to increase productivity, which greatly increases the benefits of greening.

  9. The Federal Appointment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Government. Appointments are derived from various laws, regulations, and authorizes employment with Federal agencies. The Office of Personnel Management (OPM) provides detailed...

  10. The Struggle between States and the Federal Government on the Siting of LNG Import Terminals: Has a Red Tide Washed Ashore in the Blue States?

    SciTech Connect (OSTI)

    Desautels, Denise; Ray, Peter

    2005-10-01T23:59:59.000Z

    The Energy Policy Act of 2005 transfers, in some circumstances, implementation of the public trust doctrine from the state to the federal government. Implicit in the public trust doctrine is the issue of public safety and environmental concerns. Proponents of such facilities are challenged with weighing such factors to make a successful proposal to federal and state agencies.

  11. 13605Federal Register / Vol. 76, No. 49 / Monday, March 14, 2011 / Notices Management Act, provided the public

    E-Print Network [OSTI]

    (used to vitrify waste from reprocessing of spent nuclear fuel and certain treatment material13605Federal Register / Vol. 76, No. 49 / Monday, March 14, 2011 / Notices Management Act, provided of Environmental Management, U.S. Department of Energy. ACTION: Notice of availability. SUMMARY: The Department

  12. Energy Department Sends First Energy Saving Team to Federal Government Site

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721 Federal RegisterHydrogen and FuelDefense asDepartmentandPaducahin Jamaica,

  13. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2000

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual on Federal

  14. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2001

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual on Federal1

  15. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2002

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual on Federal12

  16. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2003

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual on Federal123

  17. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2004

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual on Federal123and

  18. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2005

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual on Federal123and on

  19. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2006

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual on Federal123and

  20. FY12 -TOTAL AWARDS BY SPONSOR TYPE AND UNIT Unit Federal Industry International Private Foundation Local Government TotalOther Private State

    E-Print Network [OSTI]

    Arnold, Jonathan

    FY12 - TOTAL AWARDS BY SPONSOR TYPE AND UNIT Unit Federal Industry International Private Foundation Local Government TotalOther Private State This table reflects all awards made to UGA and UGARF,025,861 VP FOR STUDENT AFFAIRS UNITS $ 0 $ 0 $ 0 $ 0 $ 0 $ 159,668 $ 11,550 $ 171,218 AFFIRMATIVE ACTION $ 0

  1. Revealing the Hidden Value that the Federal Investment Tax Credit and Treasury Cash Grant Provide To Community Wind Projects

    E-Print Network [OSTI]

    Bolinger, Mark A.

    2011-01-01T23:59:59.000Z

    of State Incentives for Renewable Energy (DSIRE) web site,to federal incentives for renewable energy were targeteduse of federal tax incentives for renewable energy. This has

  2. Solar is Saving Energy for the Alfred A. Arraj U.S. Courthouse: Achieving Results with Renewable Energy in the Federal Government Case Study

    SciTech Connect (OSTI)

    Not Available

    2005-09-01T23:59:59.000Z

    Solar is Saving Energy for the Alfred A. Arraj U.S. Courthouse is a case study that describes how building-integrated photovoltaic systems can be incorporated into the federal sector, and also how they can provide opportunities to meet federal renewable energy goals.

  3. Decommissioning of German Research Reactors Under the Governance of the Federal Ministry of Education and Research - 12154

    SciTech Connect (OSTI)

    Weigl, M. [Karlsruhe Institute of Technology, Projekttraeger Karlsruhe (PTKA-WTE), Hermann-von-Helmholtz-Platz 1, 76344 Eggenstein-Leopoldshafen (Germany)

    2012-07-01T23:59:59.000Z

    Since 1956, nuclear research and development (R and D) in Germany has been supported by the Federal Government. The goal was to help German industry to become competitive in all fields of nuclear technology. National research centers were established and demonstration plants were built. In the meantime, all these facilities were shut down and are now in a state of decommissioning and dismantling (D and D). Meanwhile, Germany is one of the leading countries in the world in the field of D and D. Two big demonstration plants, the Niederaichbach Nuclear Power Plant (KKN) a heavy-water cooled pressure tube reactor with carbon-dioxide cooling and the Karlstein Superheated Steam Reactor (HDR) a boiling light water reactor with a thermal power of 100 MW, are totally dismantled and 'green field' is reached. Another big project was finished in 2008. The Forschungs-Reaktor Juelich 1 (FRJ1), a research reactor with a thermal power of 10 MW was completely dismantled and in September 2008 an oak tree was planted on a green field at the site, where the FRJ1 was standing before. This is another example for German success in the field of D and D. Within these projects a lot of new solutions and innovative techniques were tested, which were developed at German universities and in small and medium sized companies mostly funded by the Federal Ministry of Education and Research (BMBF). Some examples are underwater-cutting technologies like plasma arc cutting and contact arc metal cutting. This clearly shows that research on the field of D and D is important for the future. Moreover, these research activities are important to save the know-how in nuclear engineering in Germany and will enable enterprises to compete on the increasing market of D and D services. The author assumes that an efficient decommissioning of nuclear installations will help stabilize the credibility of nuclear energy. Some critics of nuclear energy are insisting that a return to 'green field sites' is not possible. The successful completion of two big D and D projects (HDR and KKN), which reached green field conditions, are showing quite the contrary. Moreover, research on D and D technologies offers the possibility to educate students on a field of nuclear technology, which will be very important in the future. In these days D and D companies are seeking for a lot of young engineers and this will not change in the coming years. (authors)

  4. THE CONTENT OF CORPORATE FEDERALISM

    E-Print Network [OSTI]

    Bratton, William W.

    2004-01-01T23:59:59.000Z

    Federalism in Corporate Governance: Protecting ShareholderCollaborative Corporate Governance: Listing Standards, Stateof Care Stadanrd in Corporate Governance 75 Iowa L. Rev. 1,

  5. 2012-13 Report on the Indirect Costs of Research Program Since 2003 the Federal Indirect Costs of Research Program provides Canadian universities with annual funding to help

    E-Print Network [OSTI]

    Brownstone, Rob

    2012-13 Report on the Indirect Costs of Research Program Since 2003 the Federal Indirect Costs of Research Program provides Canadian universities with annual funding to help pay for a portion of the hidden or "indirect" costs

  6. Government procurement: An opportunity for energy efficiency

    SciTech Connect (OSTI)

    McKane, A.T.; Harris, J.P.

    1997-06-01T23:59:59.000Z

    This panel presents information on four approaches to energy-efficient procurement: the Federal Procurement Challenge, the Energy-Efficient Procurement Collaborative, the ENERGY STAR program, and Green Seal. To provide a context for these presentations, the authors present an overview and background on the significance of and recent trends in government procurement. In the United States, the combined annual expenditures by the Federal government for energy-consuming equipment and appliances have been estimated at $10-$20 billion. The Energy Policy Act of 1992 and Executive Order 12902 direct Federal agencies to exercise leadership as the world`s largest customer to promote the purchase of energy-efficient, renewable energy, and water conserving products. The Department of Energy`s Federal Energy Management Program, through the Federal Procurement Challenge, offers Federal agencies the opportunity to coordinate these purchasing activities through a broad-based program that also links efforts at the Federal level with state and local purchasing. The Challenge is designed to use the buying power of the Federal government to: support and expand markets for today`s `best practice` energy-efficient, renewable energy, and water-conserving products; create new entry markets for advanced energy-saving technologies and products; and lower the cost of efficient products for all consumers by providing a large, reliable market. Other program objectives include: reducing operating costs for Federal agencies; reducing Federal energy use and greenhouse gas emissions; and providing a model for other levels of government, corporate, and institutional purchasers. Purchases of energy-related products by state and local governments are estimated at 3-4 times those of the entire Federal market. The multi-state Energy-Efficient Procurement Collaborative affords state and local governments the opportunity to share information and technical information on energy-efficient purchasing.

  7. OMB Guidance to Federal Agencies on Data Availability and Encryption OMB has asked that the following information be provided to Federal agencies

    E-Print Network [OSTI]

    OMB Guidance to Federal Agencies on Data Availability and Encryption OMB has asked to the availability of information needed by the agency to reliably meet its mission. Specifically, without access of their IT operations and agency services. In particular, agencies must address information availability and assurance

  8. 2012 Better Buildings Federal Award Winners | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Better Buildings Federal Award Winners 2012 Better Buildings Federal Award Winners The 2012 Better Buildings Federal Award recognized the federal government's highest-performing...

  9. 2011-12 Report on the Indirect Costs of Research Program Since 2003 the Federal Indirect Costs of Research Program provides Canadian universities with annual funding to help

    E-Print Network [OSTI]

    Brownstone, Rob

    2011-12 Report on the Indirect Costs of Research Program Since 2003 the Federal Indirect Costs or "indirect" costs of research. Examples of such costs include lighting and heating for research space, salaries for staff that provide technical or administrative research support, training costs for workplace

  10. The Evolution of State and Federal Citizenship in the United States

    E-Print Network [OSTI]

    Akiba, Takeshi

    2010-01-01T23:59:59.000Z

    Massachusetts unconstitutional and forcing the states to negotiate with the federal government for a federal regulation

  11. Domestic Water Conservation Technologies: Federal Energy Management Program (FEMP) Federal Technology Alert (Booklet)

    SciTech Connect (OSTI)

    Not Available

    2002-10-01T23:59:59.000Z

    Executive Order 13123 calls for the Federal government to conserve water as well as energy in its 500,000 facilities. To help set priorities among water-saving measures, the Federal Energy Management Program conducted a study of Federal water use in 1997. The study indicated that the government consumes more than 50% of its water in just three types of Federal facilities: housing, hospitals, and office buildings. These facilities have enough kitchens, rest rooms, and laundry areas to provide facility managers with many opportunities to begin reducing their water use (and utility costs) with appropriate water-saving fixtures and products. Therefore, this Federal Technology Alert focuses on domestic technologies, products, and appliances such as water-efficient faucets, showerheads, toilets, urinals, washing machines, and dishwashers. Conserving water also saves the energy needed to treat, pump, and heat that water in homes, businesses, and other buildings.

  12. ESTABLISHING FINAL END STATE FOR A RETIRED NUCLEAR WEAPONS PRODUCTION REACTOR; COLLABORATION BETWEEN STAKEHOLDERS, REGULATORS, AND THE FEDERAL GOVERNMENT - 11052

    SciTech Connect (OSTI)

    Bergren, C.; Flora, M.; Belencan, H.

    2010-11-17T23:59:59.000Z

    The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized/immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the upfront planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 200 mile radius) with stakeholder and SRS Citizens Advisory Board participation. These meetings were conducted over an eight month period as the end state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four SRS reactors and other hardened facilities such as the chemical Separation Facilities (canyons).

  13. ESTABLISHING FINAL END STATE FOR A RETIRED NUCLEAR WEAPONS PRODUCTION REACTOR; COLLABORATION BETWEEN STAKEHOLDERS, REGULATORS AND THE FEDERAL GOVERNMENT

    SciTech Connect (OSTI)

    Bergren, C

    2009-01-16T23:59:59.000Z

    The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized/immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the upfront planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 200 mile radius) with stakeholder and SRS Citizens Advisory Board participation. These meetings were conducted over an eight month period as the end state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four SRS reactors and other hardened facilities such as the chemical processing canyons.

  14. Federal Greenhouse Gas Inventories and Performance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Agency Progress Toward Reduction Targets Fiscal Year (FY) 2012 Greenhouse Gas Inventory: Government Totals FY 2011 Greenhouse Gas Inventory: Government Totals FY 2010...

  15. State Government Websites With Indian Tribe Information

    Broader source: Energy.gov [DOE]

    This list was compiled by the federal government's Interagency Working Group on Indian Affairs (IWGIA) as an aid to federal agency consultation with federally recognized Indian tribes. It is not...

  16. PV opportunities in the Federal sector

    SciTech Connect (OSTI)

    Thornton, J.P. [PV Engineering and Applications Branch National Renewable Energy Laboratory Golden, Colorado 81401 (United States)

    1996-01-01T23:59:59.000Z

    The Federal government is the largest user of energy in the United States today. The Department of Defense (DOD) uses more than 80{percent} of that energy; the Department of Energy is the second largest user. In the 15 years from 1975 to 1989, {dollar_sign}128 billion was spent for Federal energy activities. In 1989 alone, the Federal government spent a total of {dollar_sign}8.7 billion on energy, of which {dollar_sign}3.5 billion was for buildings and {dollar_sign}2.4 billion was for electricity. The Federal government, which owns or leases 500,000 buildings, provided an additional {dollar_sign}3.9 billion on energy assistance for low-income housing in 1989 (1). Executive Order 12902 (Energy Efficiency and Water Conservation at Federal Facilities) of March 8, 1994 implements and expands the Federal energy management provisions stated in the Energy Policy Act (EPAct) of 1992. The goal is to reduce energy use in Federal buildings to 30{percent} of the 1985 levels by the year 2005. The Federal Energy Management Program (FEMP) has been assigned the responsibility of implementing Executive Order 12902. Subsequently, DOE, FEMP, other Federal agencies and private industry have formed a unique partnership to develop a process and set of actions that will stimulate new opportunities for renewable energy technologies. If these Federal initiatives are successful, substantial investment in renewable and energy efficiency technologies will be stimulated, an important portion of the nation{close_quote}s energy needs will be supplied, and a significant reduction in greenhouse gas emissions will be achieved. {copyright} {ital 1996 American Institute of Physics.}

  17. The purpose of this article is to provide some insight to the new FCC rule changes referred to as refarming.

    E-Print Network [OSTI]

    Allen, Gale

    of the President of the United States, regulates the federal government users. The FCC or Federal Communications Commission is governed by Congress and regulates all non- federal government users. The new refarming rules established to manage the pool of frequencies set aside for the federal government and non-federal government

  18. Reducing Financing Costs for Federal ESPCs

    SciTech Connect (OSTI)

    Hughes, P.J.

    2005-01-28T23:59:59.000Z

    This report documents the recommendations of a working group commissioned by the Federal Energy Management Program (FEMP) in 2002 to identify ways to reduce financing costs in federal energy savings performance contract (ESPC) projects. The working group is part of continuing efforts launched by FEMP since the award of the Department of Energy's (DOE's) Super ESPCs in 1998 and 1999 to ensure that practical, flexible, and cost-effective alternative financing for energy-efficiency improvements is available to all federal agencies. During FY 2002-2004, the working group pursued extensive fact finding, consulted with government and private-sector finance experts, and analyzed data from federal and local government ESPC programs. The working group observed that both competition and transparency were lacking in federal ESPCs. The working group also found that the government often falls short of full compliance with certain provisions of the final rule that codifies the federal ESPC authority into regulation (10 CFR 436), which speak to due diligence in determining fair and reasonable pricing. Based on these findings, the working group formulated their short-term recommendations of actions that agencies can take immediately to reduce ESPC financing costs. The working group recommended requiring competitive solicitation of offers from prospective financiers of ESPC projects, standardization of processes to keep the playing field level and reduce energy service companies (ESCOs) project development costs, and assuring transparency by specifying that the government will see and review all bids. The reforms are intended to enable the government to determine quickly and reliably whether the portion of price related to financing is fair and reasonable and to provide auditable records of the transaction. The working group's recommendations were incorporated into modifications to the Super ESPCs and requirements to be included in the Super ESPC delivery order request for proposal (DO RFP), which is used to tailor delivery orders to the particular needs of the ordering agency and becomes a part of the contract. The financing reforms are summarized.

  19. 1998 federal technical standards workshop: Proceedings

    SciTech Connect (OSTI)

    NONE

    1998-10-01T23:59:59.000Z

    The theme for the 1998 workshop was Standards Management -- A World of Change and Opportunities. The workshop`s goal was to further the implementation of the National Technology Transfer and Advancement Act of 1995 (Public Law 104-113) through the sharing of standards management success stories, lessons learned, and emerging initiatives within the Executive Branch of the Federal Government. The target audience for this workshop included agency/department and contractor personnel and representatives of standards developing organizations that either used technical standards in their work for the Federal Government of participated in standards writing/management activities in support of the missions and programs of Federal agencies/departments. As with previous standards workshops sponsored by the DOE, views on the technical subject areas under the workshop theme were solicited from and provided by agency Standards Executives and standards program managers, voluntary standards organizations, and the private sector. This report includes vugraphs of the presentations.

  20. Federal Facility Reporting and Data

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) provides information and tools to help agencies report annual energy and water consumption and resource management efforts within Federal facilities.

  1. ANALYSIS OF CHP POTENTIAL AT FEDERAL SITES

    SciTech Connect (OSTI)

    HADLEY, S.W.

    2002-03-11T23:59:59.000Z

    This document was prepared at the request of the U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) under its Technical Guidance and Assistance and Project Financing Programs. The purpose was to provide an estimate of the national potential for combined heat and power (also known as CHP; cogeneration; or cooling, heating, and power) applications at federal facilities and the associated costs and benefits including energy and emission savings. The report provides a broad overview for the U.S. Department of Energy (DOE) and other agencies on when and where CHP systems are most likely to serve the government's best interest. FEMP's mission is to reduce the cost to and environmental impact of the federal government by advancing energy efficiency and water conservation, promoting the use of renewable energy, and improving utility management decisions at federal sites. FEMP programs are driven by its customers: federal agency sites. FEMP monitors energy efficiency and renewable energy technology developments and mounts ''technology-specific'' programs to make technologies that are in strong demand by agencies more accessible. FEMP's role is often one of helping the federal government ''lead by example'' through the use of advanced energy efficiency/renewable energy (EERE) technologies in its own buildings and facilities. CHP was highlighted in the Bush Administration's National Energy Policy Report as a commercially available technology offering extraordinary benefits in terms of energy efficiencies and emission reductions. FEMP's criteria for emphasizing a technology are that it must be commercially available; be proven but underutilized; have a strong constituency and momentum; offer large energy savings and other benefits of interest to federal sites and FEMP mission; be in demand; and carry sufficient federal market potential. As discussed in the report, CHP meets all of these criteria. Executive Order 13123 directs federal facilities to use CHP when life-cycle costs indicate energy reduction goals will be met. FEMP can assist facilities to conduct this analysis. The model developed for this report estimates the magnitude of CHP that could be implemented under various performance and economic assumptions associated with different applications. This model may be useful for other energy technologies. It can be adapted to estimate the market potential in federal buildings for any energy system based on the cost and performance parameters that a user desires to assess. The model already incorporates a standard set of parameters based on available data for federal buildings including total building space, building type, energy use intensity, fuel costs, and the performance of many prime movers commonly used in CHP applications. These and other variables can be adjusted to meet user needs or updated in the future as new data become available.

  2. Funding for this research was provided by the Joint Committee on Government and Finance of the West Virginia Legislature. The opinions

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    of the West Virginia Legislature. The opinions herein are those of the authors and do not necessarily reflect those of the Joint Committee on Government and Finance of the West Virginia Legislature, the West Virginia Higher Education Policy Commission, or the West Virginia University Board of Governors. Economic

  3. Federal Employee Training Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-10-11T23:59:59.000Z

    This Manual provides detailed requirements to supplement DOE O 360.1B, FEDERAL EMPLOYEE TRAINING. The information in this Manual is intended to assist in improving Federal workforce performance under Department of Energy (DOE) managed Federal employee training. Cancels DOE M 360.1A-1. Canceled by DOE O 360.1C.

  4. Federal Employee Training Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-09-21T23:59:59.000Z

    This Manual provides detailed requirements to supplement DOE O 360.1A, Federal Employee Training, dated 9-21-99. The information in this Manual is intended to assist in improving Federal workforce performance under Department of Energy (DOE) managed Federal employee training. Canceled by DOE M 360.1-1B.

  5. Green Grades: The Popularity and Perceived Effectiveness of Information-Based Environmental Governance Strategies

    E-Print Network [OSTI]

    Bullock, Graham Daniel

    2011-01-01T23:59:59.000Z

    STAR, the UN‘s Global Compact, the US Federal Government‘sall three basic metrics, while Global Compact and the Forestare ENERGY STAR, Global Compact, the Federal Government‘s

  6. Cool Roof Resource Guide for Federal Agencies (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-07-01T23:59:59.000Z

    Resource guide containing information and links for the evaluation and installation of cool roofs within the Federal Government

  7. Determining Price Reasonableness in Federal ESPCs

    SciTech Connect (OSTI)

    Shonder, J.A.

    2005-03-08T23:59:59.000Z

    This document reports the findings and implementation recommendations of the Price Reasonableness Working Group to the Federal ESPC Steering Committee. The working group was formed to address concerns of agencies and oversight organizations related to pricing and fair and reasonable price determination in federal energy savings performance contracts (ESPCs). This report comprises the working group's recommendations and is the proposed draft of a training curriculum on fair and reasonable price determination for users of federal ESPCs. The report includes: (1) A review of federal regulations applicable to determining price reasonableness of federal ESPCs (section 2), (2) Brief descriptions of the techniques described in Federal Acquisition Regulations (FAR) 15.404-1 and their applicability to ESPCs (section 3), and (3) Recommended strategies and procedures for cost-effectively completing price reasonableness determinations (sections 4). Agencies have struggled with fair and reasonable price determinations in their ESPCs primarily because this alternative financing vehicle is relatively new and relatively rare in the federal sector. The methods of determining price reasonableness most familiar to federal contracting officers (price competition based on the government's design and specifications, in particular) are generally not applicable to ESPCs. The regulatory requirements for determining price reasonableness in federal ESPCs have also been misunderstood, as federal procurement professionals who are inexperienced with ESPCs are further confused by multiple directives, including Executive Order 13123, which stresses life-cycle cost-effectiveness. Uncertainty about applicable regulations and inconsistent practice and documentation among agencies have fueled claims that price reasonableness determinations have not been sufficiently rigorous in federal ESPCs or that the prices paid in ESPCs are generally higher than the prices paid for similar goods and services obtained through conventional procurements. While claims of excessive prices are largely unsubstantiated and based on anecdotal evidence, the perception that there is a problem is shared by many in the ESPC community and has been noted by auditors and oversight organizations. The Price Reasonableness Working Group determined that a more formal emphasis on FAR 15.404-1 in the ESPC process could remove much of the doubt about price reasonableness determinations. The working group's recommended consensus policy on price reasonableness stresses the price analysis techniques described in the FAR that are applicable to ESPCs and includes guidance for agencies use of these techniques in determining price reasonableness for their ESPC delivery orders. The recommended policy and guidance, if communicated to federal ESPC stakeholders, can ensure that agencies will comply with the FAR in awarding ESPCs, obtain fair and reasonable prices and best value for the government, and follow procedures that provide auditable documentation of due diligence in price reasonableness determinations.

  8. Siena College Web Governance

    E-Print Network [OSTI]

    Siena College Web Governance Web Governance: Roles & Responsibilities. WEB ADVISORY COMMITTEE (WAC) The Web Advisory Committee is the Owner of the Siena homepage. The Web Advisory Committee is responsible for: Providing the process that will move Siena College

  9. LOCAL GOVERNMENT EMERGENCY PLANNING HANDBOOK

    E-Print Network [OSTI]

    management system and communications plan consistent with existing state and federal energy emergencyCALIFORNIA ENERGY COMMISSION LOCAL GOVERNMENT EMERGENCY PLANNING HANDBOOK April 2004 PUBLICATION and authorities, and to integrate their management and communications systems with both the California Energy

  10. Report: President's Energy Efficiency Contracting for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    released on December 19 applauds the federal government's success in awarding energy-saving contracts that will save taxpayer dollars. Signed by President Obama in December...

  11. H. R. 4394: a bill to amend the Price-Anderson provisions of the Atomic Energy Act of 1954 to establish liability and indemnification for nuclear incidents arising out of federal storage, disposal, and related transportation of radioactive waste. Introduced in the House of Representatives, Ninety-Ninth Congress, Second Session, March 12, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01T23:59:59.000Z

    The Federal Radioactive Waste Liability Act of 1986 (H.R. 4394) amends the Price-Anderson Act so that the federal government assumes responsibility for compensation of liability claims resulting from nuclear incidents involving federal radioactive wastes. The Act corrects the fact that the 1954 Atomic Energy Act did not provide for claims arising from the storage, disposal, or transport of federal radioactive wastes. The legislation provides for payments from the Nuclear Waste Fund of $5 billion for any one incident.

  12. US Government Outsourcing, the Private Military Industry, and Operation Iraqi Freedom: A Case Study in Conflict Contracting

    E-Print Network [OSTI]

    Halpin, Allison Ann

    2011-12-31T23:59:59.000Z

    – Federal Activities Inventory Reform FAR – Federal Acquisition Regulations FPDS-NG – Federal Procurement Data System–Next Generation 5 GAO – Government Accountability Office GMASS – Global Maintenance and Supply Services GOCO – government...

  13. Federal Employee Training

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-09-21T23:59:59.000Z

    To plan and establish requirements and assign responsibilities for Department of Energy (DOE) Federal employee training, education, and development under the Government Employees Training Act of 1958, as amended. Cancels DOE O 360.1. Canceled by DOE O 360.1B.

  14. Federal Employee Training

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-10-11T23:59:59.000Z

    To plan and establish requirements and assign responsibilities for Department of Energy (DOE) Federal employee training, education, and development (hereafter referred to as "training") under the Government Employees Training Act of 1958. Cancels DOE O 360.1A. Canceled by DOE O 360.1C.

  15. Identification of Selected Areas to Support Federal Clean Energy Goals Using Small Modular Reactors

    SciTech Connect (OSTI)

    Belles, Randy [ORNL; Mays, Gary T [ORNL; Omitaomu, Olufemi A [ORNL; Poore III, Willis P [ORNL

    2013-12-01T23:59:59.000Z

    This analysis identifies candidate locations, in a broad sense, where there are high concentrations of federal government agency use of electricity, which are also suitable areas for near-term SMRs. Near-term SMRs are based on light-water reactor (LWR) technology with compact design features that are expected to offer a host of safety, siting, construction, and economic benefits. These smaller plants are ideally suited for small electric grids and for locations that cannot support large reactors, thus providing utilities or governement entities with the flexibility to scale power production as demand changes by adding additional power by deploying more modules or reactors in phases. This research project is aimed at providing methodologies, information, and insights to assist the federal government in meeting federal clean energy goals.

  16. In Proceedings of the First National Conference on Digital Government (dg.o 2001). Los Angeles, May 2001. Data Acquisition and Integration

    E-Print Network [OSTI]

    Ambite, José Luis

    the Federal Government's Energy Information Administration (EIA), the Bureau of Labor Statistics (BLS), the Census Bureau (Census), and the California Energy Commission (CEC). Typically, this information providesIn Proceedings of the First National Conference on Digital Government (dg.o 2001). Los Angeles, May

  17. Post war federal reserve policy

    E-Print Network [OSTI]

    Modrow, William Geoffery

    1953-01-01T23:59:59.000Z

    Direct and Guaranteed 1 p 4 ~ ~ ~ 1 ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ 51 Principal Policy actions of Federal Reserve S3f'stems lg'+i 0 i ~ ~ ~ ~ 0 ~ ~ 4 ~ ~ 0 ~ t ~ ~ ~ ~ XX, Sember Sank Reserves and Determinants& 194S-1949 ~ ~ 69 XXX, Yields on United States... a consequence of such action the amount oi' money in the economy ?as determined by the holders of Govern ment securities, Reasures taken by the Federal Reserve to contract bank credit were largely offset by Federal Reserve purchases of Government...

  18. Federal Greenhouse Gas Inventories and Performance

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program provides performance data illustrating federal agency progress in meeting the greenhouse gas reduction targets established under Executive Order (E.O.) 13514, as well as the comprehensive greenhouse gas inventories as reported by federal agencies.

  19. Biomass Resources for the Federal Sector

    SciTech Connect (OSTI)

    Not Available

    2005-08-01T23:59:59.000Z

    Biomass Resources for the Federal Sector is a fact sheet that explains how biomass resources can be incorporated into the federal sector, and also how they can provide opportunities to meet federal renewable energy goals.

  20. Federal Technical Capability Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-05T23:59:59.000Z

    The Federal Technical Capability Manual provides the process for the recruitment, deployment, development, and retention of Federal personnel with the demonstrated technical capability to safely accomplish the Departments missions and responsibilities at defense nuclear facilities. Canceled by DOE M 426.1-1A. Does not cancel other directives.

  1. Achieving Accelerated Cleanup of Cesium Contaminated Stream at the Savannah River Site; Collaboration between Stakeholders, Regulators, and the Federal Government - 13182

    SciTech Connect (OSTI)

    Bergren, Chris; Flora, Mary; Socha, Ron; Burch, Joseph [Savannah River Nuclear Solutions, LLC, Bldg. 730-4B, Aiken, SC 29808 (United States)] [Savannah River Nuclear Solutions, LLC, Bldg. 730-4B, Aiken, SC 29808 (United States); Freeman, Candice; Hennessey, Brian [United States Department of Energy, Bldg. 730-B, Aiken, SC 29808 (United States)] [United States Department of Energy, Bldg. 730-B, Aiken, SC 29808 (United States)

    2013-07-01T23:59:59.000Z

    The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina that contains six primary stream/river systems. The Lower Three Runs Stream (LTR) is one of the primary streams within the site that is located in the southeast portion of the Savannah River Site and is a large black water stream system that originates in the northeast portion of SRS and follows a southerly direction before it enters the Savannah River. During reactor operations, secondary reactor cooling water, storm sewer discharges, and miscellaneous wastewater was discharged and contaminated a 36 kilometer stretch of Lower Three Runs Stream that narrows providing a limited buffer of US DOE property along the stream and flood plain. Based on data collected during 2009 and 2010 under Recover Act Funding, the stream was determined to be contaminated with cesium-137 at levels that exceeded acceptable risk based limits. As efficiencies were realized within the SRS Recovery Act Program, funding was made available to design, permit and execute remediation of the LTR. This accelerated Project allowed for the remediation of 36 kilometers of LTR in only nine months from inception to completion, contributing significantly to the Foot Print Reduction of SRS. The scope consisted of excavation and disposal of more than 2064 cubic meters of contaminated soil, and installing 11 kilometers of fence and 2,000 signs at 1000 locations. Confirmatory sampling and analysis, and radiological surveying were performed demonstrating that soil concentrations met the cleanup goals. The project completed with a very good safety record considering the harsh conditions including, excessive rain in the early stages of the project, high summer temperatures, swampy terrain, snakes, wild boar, insects and dense vegetation. The regulatory approval process was compressed by over 75% and required significant efforts from SRS's stakeholders including the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), and the public including local property owners and the SRS Citizens Advisory Board. Stakeholder buy-in was critical in the up-front planning in order to achieve this challenging cleanup. (authors)

  2. Federal laboratories for the 21st century

    SciTech Connect (OSTI)

    Gover, J. [Sandia National Labs., Albuquerque, NM (United States); Huray, P.G. [Univ. of South Carolina, Columbia, SC (United States)

    1998-04-01T23:59:59.000Z

    Federal laboratories have successfully filled many roles for the public; however, as the 21st Century nears it is time to rethink and reevaluate how Federal laboratories can better support the public and identify new roles for this class of publicly-owned institutions. The productivity of the Federal laboratory system can be increased by making use of public outcome metrics, by benchmarking laboratories, by deploying innovative new governance models, by partnerships of Federal laboratories with universities and companies, and by accelerating the transition of federal laboratories and the agencies that own them into learning organizations. The authors must learn how government-owned laboratories in other countries serve their public. Taiwan`s government laboratory, Industrial Technology Research Institute, has been particularly successful in promoting economic growth. It is time to stop operating Federal laboratories as monopoly institutions; therefore, competition between Federal laboratories must be promoted. Additionally, Federal laboratories capable of addressing emerging 21st century public problems must be identified and given the challenge of serving the public in innovative new ways. Increased investment in case studies of particular programs at Federal laboratories and research on the public utility of a system of Federal laboratories could lead to increased productivity of laboratories. Elimination of risk-averse Federal laboratory and agency bureaucracies would also have dramatic impact on the productivity of the Federal laboratory system. Appropriately used, the US Federal laboratory system offers the US an innovative advantage over other nations.

  3. The Combined Federal Campaign: Scoring a Touchdown in Giving

    Broader source: Energy.gov [DOE]

    It has been said that Federal employees are big-hearted people. We could not agree more, and nothing demonstrates that caring spirit year after year better than the Combined Federal Campaign (CFC), the Federal government’s annual giving drive.

  4. Federal Energy-Saving Program Keeps Federal Government on Pace...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to avoid upfront capital cost. The 39-megawatt plant is dramatically reducing pollution and greenhouse gas emissions. The Navy designed and constructed a state-of-the-art...

  5. Federal Government Support for Fuel Cell Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport in RepresentativeDepartmentEnergyEnergyDepartment of EnergyState and

  6. Federal Government Resources | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015of 2005 at Iowa Wind TurbineTuesday,Left to right:Energy The

  7. Federal Water Use Indices

    Broader source: Energy.gov [DOE]

    FEMP provides water use indices as a guide for Federal agencies. Note that each is a rough estimate of water usage at different types of sites. Your site may vary considerably.

  8. Transforming Federal sector procurement of performance based energy services

    SciTech Connect (OSTI)

    Dahle, D.E.

    1998-07-01T23:59:59.000Z

    Federal agencies are mandated to reduce their energy use by 30% by 2005. The investment in energy projects required to achieve this reduction is estimated at $4 billion to $6 billion. The Department of Energy's (DOE's) Federal Energy Management Program (FEMP) has developed streamlined procurement vehicles to allow Federal agencies to acquire private-sector-financed, performance-based energy services for all Federal buildings. These procurement vehicles, called Super Energy Savings Performance Contracts (Super ESPCs) will be in place covering all regions of the US by summer 1998. The six regional DOE ESPC contracts will provide agencies the ability to contract for up to $4.5 billion in private sector financed energy services. This represents an estimated potential of $3 billion in private sector investments in Federal buildings for energy efficiency, renewable energy and water conservation projects. DOE has developed guidelines and unique project development tools that will allow Federal agencies to contract for ESPC services in months rather than in the years it used to take to develop and implement site specific ESPC projects. The Federal government's buying power has transformed the energy services and utilities industries by stimulating the formation of new cross-industry teams and partnerships to meet the breadth of capability and ability to respond to the needs of Federal facilities in large geographic regions. This paper presents results to date and describes the linkages between the Super ESPC Program and the US Climate Change Proposal. A key US strategy that calls for Federal leadership, and in particular for DOE to spearhead a comprehensive effort to reduce greenhouse gas emissions from Federal sources.

  9. Energy Use Analysis for the Federal Energy Management Program

    E-Print Network [OSTI]

    Mazzucchi, R. P.; Devine, K. D.

    1988-01-01T23:59:59.000Z

    Recent congressional legislation allows federal agencies new authorities to contract for energy savings by sharing the acquired savings with an energy service company. As part of its charter to make the federal government more energy...

  10. Guidelines and Checklist for Commissioning and Government Acceptance...

    Broader source: Energy.gov (indexed) [DOE]

    Checklist, and Contract Clauses for Government Acceptance of Super ESPC Projects Commissioning Guidance for ESPCs Draft M&V Guidelines: Measurement and Verification for Federal...

  11. NNSA Awards Contract for Largest Federal Wind Farm to Siemens...

    National Nuclear Security Administration (NNSA)

    Contract for Largest Federal Wind Farm to Siemens Government Technologies, Inc. | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission...

  12. White House Honors Federal Agencies for Saving Taxpayers $133...

    Office of Environmental Management (EM)

    and EPAct requires that the federal government purchase at least 7.5 percent of electricity from renewable energy sources by 2013. Awardees were selected from nominations...

  13. Government Personal Property Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-09-23T23:59:59.000Z

    To establish procedures for managing Government personal owned or leased by the Department of Energy (DOE) and in the custody of DOE Headquarters employees, including those in the National Nuclear Security Administration (NNSA), in accordance with Federal and Departmental regulations. Cancels HQ O 580.1.

  14. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    SciTech Connect (OSTI)

    Not Available

    2013-03-01T23:59:59.000Z

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

  15. Federal Participation in LEED in 2005

    SciTech Connect (OSTI)

    Payne, Christopher; Dyer, Beverly

    2005-11-01T23:59:59.000Z

    The federal government is an active participant in promotingsustainable design, construction and operations and in the use of USGBC'sLeadership in Energy and Environmental Design (LEED) Green BuildingRating System. This paper presents an overview of sustainableconstruction activities in the federal sector in 2005.

  16. Guiding Principles for Federal Leadership in High-Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustainable Buildings Guiding Principles for Federal Leadership in High-Performance and Sustainable Buildings The Federal Energy Management Program (FEMP) provides guidance to...

  17. Federal, Municipal, Universities and Other ESPC Case Studies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal, Municipal, Universities and Other ESPC Case Studies from Different States Federal, Municipal, Universities and Other ESPC Case Studies from Different States Provides a...

  18. Reviewing Measurement and Verification Plans for Federal ESPC...

    Office of Environmental Management (EM)

    Measurement and Verification Plans for Federal ESPC Projects Reviewing Measurement and Verification Plans for Federal ESPC Projects Document provides a framework for implementing...

  19. Solar Federal Buildings Program plan

    SciTech Connect (OSTI)

    Not Available

    1980-02-01T23:59:59.000Z

    The Solar Federal Buildings Program (SFBP) is a multi-year program designed to stimulate the growth and improve the efficiency of the solar industry by providing funds to Federal agencies for the design, acquisition, construction, and installation of commercially applicable solar hot water, heating, cooling, and process systems in new and existing Federal buildings. This document outlines the Program Plan to be used in implementing this major solar commercialization effort.

  20. Restructuring, Tight Budgets and Executive Order 13123 Create New Incentives to Reduce Waste in Federal Industrial Facilities 

    E-Print Network [OSTI]

    Verdict, M. E.

    2000-01-01T23:59:59.000Z

    . The Federal government is the single largest U.S. consumer of energy. Federal industrial and energy intensive operations cost the taxpayer $600 million in FY 1998 and were exempt from mandatory energy reduction goals. Executive Order 13123 requires Federal...

  1. 24th Annual BIA Tribal Providers Conference

    Office of Energy Efficiency and Renewable Energy (EERE)

    The BIA Tribal Providers Conference is the second largest conference in Alaska, providing opportunities for tribal leaders, native corporations and rural representatives to connect with federal...

  2. FUPWG Spring 2010 Providence: Washington Update | Department...

    Energy Savers [EERE]

    Spring 2010 Providence: Washington Update FUPWG Spring 2010 Providence: Washington Update Presentation covers an update on Washington and is given at the Spring 2010 Federal...

  3. FEMP (Federal Energy Management Program) Update, Spring 1989

    SciTech Connect (OSTI)

    Not Available

    1989-04-01T23:59:59.000Z

    The FEMP Update, published quarterly by the Federal Energy Management Program (FEMP), provides information that will assist federal managers in their energy management responsibilities. The Update is distributed primarily to federal facility and energy management personnel.

  4. Evaluation of the Impact of EISA Federal Project Investments

    SciTech Connect (OSTI)

    Judd, Kathleen S.; Wendel, Emily M.; Morris, Scott L.; Williamson, Jennifer L.; Halverson, Mark A.; Livingston, Olga V.; Loper, Susan A.

    2012-12-31T23:59:59.000Z

    The DOE's Federal Energy Management Program has been charged by Office of Management and Budget to conduct an evaluation on actual and verifiable energy savings and carbon emissions reductions from federal energy management investments made across the Federal government as a result of the Energy Independence and Security Act of 2007. This study presents the findings from that evaluation.

  5. Facilitating Sound, Cost-Effective Federal Energy Management (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-03-01T23:59:59.000Z

    This fact sheet is an overview of the U.S. Department of Energy's Federal Energy Management Program (FEMP). The Federal Government, as the nation's largest energy consumer, has a tremendous opportunity and acknowledged responsibility to lead by example. The U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) plays a critical role in this effort. FEMP facilitates the Federal Government's implementation of sound, cost-effective energy management and investment practices to enhance the nation's energy security and environmental stewardship. FEMP does this by focusing on the needs of its Federal customers, delivering an array of services across a variety of program areas.

  6. Expert Panel Report on R&D proposes fundamental changes to Canada's Innovation System In October 2010 the Federal government charged Open Text President Tom Jenkins, U of T

    E-Print Network [OSTI]

    number of funding programs presently dispersed through the federal system would be consolidatedExpert Panel Report on R&D proposes fundamental changes to Canada's Innovation System In October and possible consolidation of funding programs. This could lead to some changes in the way tri-council programs

  7. Federal Sustainable Print Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-07-07T23:59:59.000Z

    This Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental Sustainability, dated 5-2-11 and related to the sustainability requirements contained in Executive Order 13693, "Planning for Federal Sustainability in the Next Decade”.

  8. Presidential Documents Federal Register

    E-Print Network [OSTI]

    Presidential Documents 3821 Federal Register Vol. 76, No. 14 Friday, January 21, 2011 Title 3, 1993. As stated in that Executive Order and to the extent permitted by law, each agency must, among, such as user fees or marketable permits, or providing information upon which choices can be made by the public

  9. The Evolution of the Federal Monitoring and Assessment Center

    SciTech Connect (OSTI)

    NSTec Aerial Measurement System

    2012-07-31T23:59:59.000Z

    The Federal Radiological Monitoring and Assessment Center (FRMAC) is a federal emergency response asset whose assistance may be requested by the Department of Homeland Security (DHS), the Department of Defense (DoD), the Environmental Protection Agency (EPA), the Nuclear Regulatory Commission (NRC), and state and local agencies to respond to a nuclear or radiological incident. It is an interagency organization with representation from the Department of Energy’s National Nuclear Security Administration (DOE/NNSA), the Department of Defense (DoD), the Environmental Protection Agency (EPA), the Department of Health and Human Services (HHS), the Federal Bureau of Investigation (FBI), and other federal agencies. FRMAC, in its present form, was created in 1987 when the radiological support mission was assigned to the DOE’s Nevada Operations Office by DOE Headquarters. The FRMAC asset, including its predecessor entities, was created, grew, and evolved to function as a response to radiological incidents. Radiological emergency response exercises showed the need for a coordinated approach to managing federal emergency monitoring and assessment activities. The mission of FRMAC is to coordinate and manage all federal radiological environmental monitoring and assessment activities during a nuclear or radiological incident within the United States in support of state,local, tribal governments, DHS, and the federal coordinating agency. Radiological emergency response professionals with the DOE’s national laboratories support the Radiological Assistance Program (RAP), National Atmospheric Release Advisory Center (NARAC), the Aerial MeasuringSystem (AMS), and the Radiation Emergency Assistance Center/Training Site (REAC/TS). These teams support the FRMAC to provide: ? Atmospheric transport modeling ? Radiation monitoring ? Radiological analysis and data assessments ? Medical advice for radiation injuries In support of field operations, the FRMAC provides geographic information systems, communications, mechanical, electrical, logistics, and administrative support. The size of the FRMAC is tailored to the incident and is comprised of emergency response professionals drawn from across the federal government. State and local emergency response teams may also integrate their operations with FRMAC, but are not required to.

  10. Improving School Governance | 1 Improving School Governance

    E-Print Network [OSTI]

    Rambaut, Andrew

    Improving School Governance | 1 Improving School Governance A Recommended Code of Governance for Schools: A flexible framework for strategic planning October 2012 Pilot version 1 #12;Improving School Governance | 2 #12;Improving School Governance | 3 This pilot version of the Recommended Code of Governance

  11. Report on extending the solar program in Federal buildings

    SciTech Connect (OSTI)

    Not Available

    1980-02-01T23:59:59.000Z

    The potential benefits of extending the Solar in Federal Buildings Program are presented. Some of these are: meeting National Energy Conservation Policy Act goals, centralized management of program elements, establish central coordination of federal agency solar activities, assert federal government leadership role in promoting solar technologies, guarantee market support to solar industry, expanding federal agency solar activities, development of private and public sector solar capabilities, and enhancement of solar product development effort. (MHR)

  12. Federal Buildings Supplemental Survey 1993

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    The Energy Information Administration (EIA) of the US Department of Energy (DOE) is mandated by Congress to be the agency that collects, analyzes, and disseminates impartial, comprehensive data about energy including the volume consumed, its customers, and the purposes for which it is used. The Federal Buildings Supplemental Survey (FBSS) was conducted by EIA in conjunction with DOE`s Office of Federal Energy Management Programs (OFEMP) to gain a better understanding of how Federal buildings use energy. This report presents the data from 881 completed telephone interviews with Federal buildings in three Federal regions. These buildings were systematically selected using OFEMP`s specifications; therefore, these data do not statistically represent all Federal buildings in the country. The purpose of the FBSS was threefold: (1) to understand the characteristics of Federal buildings and their energy use; (2) to provide a baseline in these three Federal regions to measure future energy use in Federal buildings as required in EPACT; and (3) to compare building characteristics and energy use with the data collected in the CBECS.

  13. A Time for Political Courage: The Federal Debt Crisis in 2014

    E-Print Network [OSTI]

    Taylor, Lori L.

    Like many Americans, Uncle Sam has a bad habit of spending more than he earns. The federal government’s total expenditures exceeded its total revenues in 36 of the last 40 years. In 2012, federal government revenues were 16% of gross domestic...

  14. Life-cycle costing manual for the federal energy management programs

    SciTech Connect (OSTI)

    Ruegg, R.T.

    1982-05-01T23:59:59.000Z

    This manual is a guide to understanding the life-cycle costing method and an aid to calculating the measures required for evaluating energy conservation and renewable energy investments in all Federal buildings. It expands upon the life-cycle costing criteria contained in the Program Rules of the Federal Energy Management Program (Subpart A of Part 436, Title 10, U.S. Code of Federal Regulations) and is consistent with those criteria. Its purpose is to facilitate the implementation of the Program Rules by explaining the life-cycle costing method, defining the measures, describing the assumptions and procedures to follow in performing evaluations, and giving examples. It provides worksheets, a computer program, and instructions for calculating the required measurements. The life-cycle costing method and evaluation procedures set forth in the Federal Energy Management Program Rules and described in greater detail in this guide are to be followed by all Federal agenecies for all energy conservation and renewable energy projects undertaken in new and existing buildings and facilities owned or leased by the Federal government, unless specifically exempted. The establishment of the methods and procedures and their use by Federal agencies to evaluate energy conservation and solar energy investments are required by Section 381(a)(2) of the Energy Policy and Conservation Act, as amended, 42 U.S.C. 6361(a)(2); by Section 10 of Presidential Executive Order 11912, amended; and by Title V of the National Energy Conservation Policy Act, 92 Stat. 3275.

  15. Miscellaneous agreements between the U.S. Department of Energy and Federal, State, and local agencies.

    SciTech Connect (OSTI)

    Meincke, Carol L.

    2010-08-01T23:59:59.000Z

    This document identifies and provides access to source documentation for the Site- Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico. Specifically, it lists agreements between the U.S. Department of Energy (DOE), the National Nuclear Security Administration (NNSA), DOE/NNSA/Sandia Site Office (SSO), Sandia Corporation, and local and state government agencies, Department of Defense, Kirtland Air Force Base, and other federal agencies.

  16. EPA and the Federal Technology Transfer Act: Opportunity knocks

    SciTech Connect (OSTI)

    Gatchett, A.M.; Fradkin, L.; Moore, M.; Gorman, T.; Ehrlich, A. [Environmental Protection Agency, Washington, DC (United States)

    1990-12-31T23:59:59.000Z

    In 1986, the Federal Technology Transfer Act (FTTA) was established to promote a closer, collaborative relationship between federal government agencies and the private sector. With the increasing need for new cost-effective technologies to prevent and control pollution, both the US Environmental Protection Agency (EPA) and private industry are encouraged to facilitate the transfer of knowledge and technology under this Act. The FTTA removed several of the legal and institutional barriers to cooperative research that existed before the Act`s passage. Through the FTTA, the government strives to promote the movement of its products, processes, skills, and knowledge into the private sector for further development and commercialization by encouraging the exchange of technical personnel and the sharing of facilities and other resources. Collaborative efforts between industry, federal agencies, and academia are made possible through cooperative research and development agreements (CRADAs). Forty-two CRADAs and five licensing agreements have been initiated with EPA under this program. This paper provides an overview of this new and innovative program within the EPA. 1 fig., 2 tabs.

  17. Denver Federal Center Saves Energy, Forges Partnerships Through Super ESPC. Federal Energy Management Program (FEMP) ESPC Case Study

    SciTech Connect (OSTI)

    Not Available

    2002-01-01T23:59:59.000Z

    The General Services Administration is not just replacing aging heating and cooling equipment and reducing maintenance costs at the 670-acre Denver Federal Center (DFC). The GSA is also helping the government save about $450,000 in annual energy costs, conserve nearly 11 million gallons of water per year, and reduce annual carbon dioxide emissions by 15.9 million pounds, all by making use of the Department of Energy's Super Energy Savings Performance Contracts (Super ESPCs) at the DFC. Under these contracts, an energy services provider pays the up-front project costs and is then repaid over the contracts term out of the resulting energy cost savings. This two-page case study, prepared by NREL for the DOE Federal Energy Management Program (FEMP), demonstrates how the GSA forged new project partnerships, improved the DFCs boiler plant, and acquired efficient new chillers, motors, controls, and lighting by placing two delivery orders for this work under FEMPs Central Region Super ESPC.

  18. Guidelines, Checklist, and Contract Clauses for Government Acceptance of Super ESPC Projects

    Broader source: Energy.gov [DOE]

    Document lists all the elements required for a completed super energy savings performance contract (ESPC) project to receive Federal government acceptance.

  19. Federal Register

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2: FinalOffers New Training on Energy6 Federal Energy1999; Exceeds Goal |of65541 Vol. 79,

  20. Federal Register

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6Awards »Facilities |Federal29853 Vol.

  1. Federal Register

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysisDarby/%2AO 474.2Y-12 Press989 Federal Register

  2. Federal Register

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysisDarby/%2AO 474.2Y-12 Press989 Federal

  3. Federal Register

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysisDarby/%2AO 474.2Y-12 Press989 Federal49

  4. Federal Register

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysisDarby/%2AO 474.2Y-12 Press989 Federal4954

  5. Federated search

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) Environmental Assessments (EA)Budget » FYU.S. DOE Office of SciencedefaultFederated

  6. Corporate Governance and Taxation

    E-Print Network [OSTI]

    Dyck, Alexander

    2004-01-01T23:59:59.000Z

    Accounting and Corporate Governance,” Journal of Accounting1997) “A Survey of Corporate Governance” Journal of FinanceCorporate Governance and Taxation Mihir A. Desai* Harvard

  7. Oncor Electric Delivery- Government and Education Facilities Program

    Broader source: Energy.gov [DOE]

    The Government Facilities Program was developed to provide viable energy efficiency and demand reduction solutions for city and county owned and operated facilities. As part of the Government...

  8. 2010 Northwest Federal Market Assessment Report

    SciTech Connect (OSTI)

    Scanlon, Tim; Sandusky, William F.

    2011-09-01T23:59:59.000Z

    The primary intent of this market assessment is to provide insights on the effectiveness of current energy efficiency and renewable energy program offerings available to Federal sites in the region. The level of detail, quality and currency of the data used in this market assessment varies significantly by Federal agency and energy efficiency service provider. Limited access to some Federal sites, limited availability of key points of contact, time/resource constraints, and other considerations limited the total number of Federal agencies and energy efficiency service providers participating in the survey.

  9. Government Information Interest Group (GIIG) Rolling in the Deep Web

    E-Print Network [OSTI]

    Nair, Sankar

    Government Information Interest Group (GIIG) Rolling in the Deep Web: Mining free resources;Most Science Info Is in the Deep Web Federated Searching Federated search drills down to the deep web where scientific databases reside Students and researchers need information from the deep web. Unlike

  10. Presented to: Federal Aviation

    E-Print Network [OSTI]

    Illinois at Chicago, University of

    Aviation Administration 2 Briefing Agenda · Federal Aviation Administration (FAA) Overview · Chicago Federal Aviation Administration 5 FAA relationship with Airport Sponsors · Regulatory ­ airport Federal Aviation Administration 8 FAA involvement with the O'Hare Modernization Program · Special Projects

  11. Presented to: Federal Aviation

    E-Print Network [OSTI]

    Bustamante, Fabián E.

    Administration 2 Briefing Agenda · Federal Aviation Administration (FAA) Overview · Chicago/Chicago Department of Aviation (CDA) and the O'Hare Modernization Program (OMP) · Federal Aviation Administration (FAA) actions Federal Aviation Administration 5 FAA relationship with Airport Sponsors · Regulatory ­ airport

  12. Government Documents Interest Group (GDIG) Free Science Information from

    E-Print Network [OSTI]

    Nair, Sankar

    Government Documents Interest Group (GDIG) Free Science Information from Uncle Sam ­ Getting selected science information provided by U.S. Government agencies including research and development Scientific and Technical Information Program National Science Foundation United States Government Printing

  13. Analysis of the obstacles to financing geothermal hydrothermal commercialization projects and the government programs designed to remove them

    SciTech Connect (OSTI)

    Not Available

    1981-03-20T23:59:59.000Z

    The risks associated with geothermal hydrothermal commercialization are broken down into five categories: resource risk; technological risk; regulatory risk; investment parity risks; and institutional risk aversion. The impact of each risk upon geothermal financing is assessed. The federal government's programs to provide financial incentives for geothermal development are presented as follows: tax incentives; indirect financial incentives programs; direct grant/cost-sharing programs; and attempts at reducing regulatory risk through the enactment of legal and institutional reforms. (MHR)

  14. Life-cycle costing manual for the Federal energy management program: a guide for evaluating the cost effectiveness of energy conservation and renewable energy projects for new and existing Federally owned and leased buildings and facilities. Final report

    SciTech Connect (OSTI)

    Ruegg, R.T.

    1980-12-01T23:59:59.000Z

    This manual is a guide to understanding the life-cycle costing method and an aid to calculating the measures required for evaluating energy conservation and renewable energy investments in all Federal buildings. It expands upon life-cycle costing criteria contained in the Program Rules of the Federal Energy Management Program (Subpart A of Part 436, Title 10, US Code of Federal Regulations) and is consistent with those criteria. Its purpose is to facilitate the implementation of the Program Rules by explaining the life-cycle costing method, defining the measures, describing the assumptions and procedures to follow in performing evaluations, and giving examples. It provides worksheets, a computer program, and instructions for calculating the required measurements. The life-cycle costing method and evaluation procedures set forth in the Federal Energy Management Program Rules and described in greater detail in this guide are to be followed by all Federal agencies for all energy conservation and renewable energy projects undertaken in new and existing buildings and facilities owned or leased by the Federal government, unless specifically exempted. The establishment of the methods and procedures and their use by Federal agencies to evaluate energy conservation and solar energy investments are required by Section 381(a) (2) of the Energy Policy and Conservation Act, as amended, 42 U.S.C. 6361 (a) (2); Section 10 of Presidential Executive Order 11912, amended; and by Title V of the National Energy Conservation Policy Act, 92 Stat. 3275.

  15. Federal Register / Vol. 59, No. 2 / Tuesday, January 4, 1994 / Notices and operated federal laboratories,

    E-Print Network [OSTI]

    laboratories, including NIST, to enter into cooperative research and development, agreements (CRADAs) with qualified parties. Under the law, a CRADA may provide for contributions from the federal laboratory

  16. National policy dialogue on state and federal regulation of the electricity industry - staff report on a Keystone policy dialogue

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    For over two years, The Keystone Center facilitated a dialogue on State and Federal Regulation of the Electricity Industry. The intent of this report is to assist policy-makers faced with decisions about changes to traditional utility regulation and planning and provide an overview of a diverse group`s deliberations on regulatory jurisdictional conflicts. This report is not a consensus document, rather it is a staff written summary of two years of discussion on the issues. The participants in the Keystone Dialogue believed that all affected interests could benefit from, if nothing else, a summary of their discussions of state/federal issues. The electric utility industry is one of the last remaining, heavily regulated industries in the United States. Rate and corporate regulation is split between state and federal governments and there is distinct regulatory authority at each level. For example, retail rate regulation occurs at the state level, the Federal Energy Regulatory Commission is responsible for wholesale rate regulation under the Federal Power Act, and the Securities and Exchange Commission oversees registered utility holding companies as defined under the Public Utility Holding Company Act of 1935. This jurisdictional split between state and federal regulation has evolved over many years through legislation and litigation on such matters. The creation of this allocation of regulatory responsibility was initiated in 1935 with the passage of the Public Utility Holding Company Act and the Federal Power Act when the economic and technological changes that are now occurring in the industry simply could not have been envisioned.

  17. Greening the Department of Energy through waste prevention, recycling, and Federal acquisition. Strategic plan to implement Executive Order 13101

    SciTech Connect (OSTI)

    None

    2000-11-01T23:59:59.000Z

    This Plan provides strategies and milestones to implement Executive Order 13101, Greening the Government Through Waste Prevention, Recycling, and Federal Acquisition, and to achieve the new Secretarial goals for 2005 and 2010. It serves as the principal Secretarial guidance to Department of Energy (DOE) Headquarters, Field Offices, and laboratory and contractor staff to improve sanitary waste prevention, recycling, and the purchase and use of recycled content and environmentally preferable products and services in the DOE.

  18. Federal Energy Management Program (FEMP): What`s new in federal energy management: Program overview: Energy savings performance contracting

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    The Energy Policy Act of 1992 and Executive Order 12902 require that Federal agencies reduce the energy consumed in Federal buildings. Goal was increased to 30% by 2005, compared with 1985. Energy Savings Performance Contracting (ESPC) offers a means of achieving this energy reduction goal at no capital cost to the government. ESPC is an alternative to the traditional method of financing energy efficiency improvement in Federal buildings; it involves contracting with energy service companies.

  19. Federal Aviation Administration

    E-Print Network [OSTI]

    /Testing #12;16Federal Aviation Administration GMU CATSR 6 February 2012 The FAA William J. Hughes Technical operational test and evaluation agent for FAA #12;17Federal Aviation Administration GMU CATSR 6 February 2012Federal Aviation Administration Federal Aviation AdministrationNextGen: Primer, Challenges

  20. Open government information awareness

    E-Print Network [OSTI]

    McKinley, Ryan, 1976-

    2003-01-01T23:59:59.000Z

    In the United States, there is a widening gap between a citizen's ability to monitor his or her government and the government's ability to monitor a citizen. Average citizens have limited access to important government ...

  1. Law and Corporate Governance

    E-Print Network [OSTI]

    Fligstein, Neil; Choo, Jennifer

    2005-01-01T23:59:59.000Z

    1997. A survey of corporate governance. J. Finan. 52(2):737-1999. Employees and Corporate Governance. Washington, DC:structural change in corporate governance. J. Law Soc. 27(

  2. U.S. Federal Investments in Energy R&D: 1961-2008

    E-Print Network [OSTI]

    of U.S. federal government support for energy research and development (R&D). Data on energy R support for energy research and development (R&D), occurring between 1961 and 2008. The purpose-2008. This paper also documents U.S. federal government spending on key large scale energy R&D programs that were

  3. Performance Contracting and Energy Efficiency in the State Government Market

    SciTech Connect (OSTI)

    Bharvirkar, Ranjit; Goldman, Charles; Gilligan, Donald; Singer, Terry E.; Birr, David; Donahue, Patricia; Serota, Scott

    2008-11-14T23:59:59.000Z

    There is growing interest in energy efficiency (EE) among state policymakers as a result of increasing environmental concerns, rising electricity and natural gas prices, and lean economic times that motivate states to look more aggressively for cost-saving opportunities in public sector buildings. One logical place for state policymakers to demonstrate their commitment to energy efficiency is to 'lead by example' by developing and implementing strategies to reduce the energy consumption of state government facilities through investments in energy efficient technologies. Traditionally, energy efficiency improvements at state government facilities are viewed as a subset in the general category of building maintenance and construction. These projects are typically funded through direct appropriations. However, energy efficiency projects are often delayed or reduced in scope whereby not all cost-effective measures are implemented because many states have tight capital budgets. Energy Savings Performance Contracting (ESPC) offers a potentially useful strategy for state program and facility managers to proactively finance and develop energy efficiency projects. In an ESPC project, Energy Service Companies (ESCOs) typically guarantee that the energy and cost savings produced by the project will equal or exceed all costs associated with implementing the project over the term of the contract. ESCOs typically provide turnkey design, installation, and maintenance services and also help arrange project financing. Between 1990 and 2006, U.S. ESCOs reported market activity of {approx}$28 Billion, with about {approx}75-80% of that activity concentrated in the institutional markets (K-12 schools, colleges/universities, state/local/federal government and hospitals). In this study, we review the magnitude of energy efficiency investment in state facilities and identify 'best practices' while employing performance contracting in the state government sector. The state government market is defined to include state offices, state universities, correctional facilities, and other state facilities. This study is part of a series of reports prepared by Lawrence Berkeley National Laboratory (LBNL) and the National Association of Energy Services Companies (NAESCO) on the ESCO market and industry trends. The scope of previous reports was much broader: Goldman et al. (2002) analyzed ESCO project costs and savings in public and private sector facilities, Hopper et al. (2005) focused on ESCO project activity in all public and institutional sectors, while Hopper et al (2007) provided aggregate results of a comprehensive survey of ESCOs on current industry activity and future prospects. We decided to focus the current study on ESCO and energy efficiency activity and potential market barriers in the state government market because previous studies suggested that this institutional sector has significant remaining energy efficiency opportunities. Moreover, ESCO activity in the state government market has lagged behind other institutional markets (e.g., K-12 schools, local governments, and the federal market). Our primary objectives were as follows: (1) Assess existing state agency energy information and data sources that could be utilized to develop performance metrics to assess progress among ESPC programs in states; (2) Conduct a comparative review of the performance of selected state ESPC programs in reducing energy usage and costs in state government buildings; and (3) Delineate the extent to which state government sector facilities are implementing energy efficiency projects apart from ESPC programs using other strategies (e.g. utility ratepayer-funded energy efficiency programs, loan funds).

  4. Federal Technical Capability Policy for Defense Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-12-10T23:59:59.000Z

    The policy regarding the Federal Technical Capability Program, which provides for the recruitment, deployment, development, and retention of Federal personnel with the demonstrated technical capability to safely accomplish the Department’s missions and responsibilities.

  5. Analysis of federal incentives used to stimulate energy consumption

    SciTech Connect (OSTI)

    Cole, R.J.; Cone, B.W.; Emery, J.C.; Huelshoff, M.; Lenerz, D.E.; Marcus, A.; Morris, F.A.; Sheppard, W.J.; Sommers, P.

    1981-08-01T23:59:59.000Z

    The purpose of the analysis is to identify and quantify Federal incentives that have increased the consumption of coal, oil, natural gas, and electricity. The introductory chapter is intended as a device for presenting the policy questions about the incentives that can be used to stimulate desired levels of energy development. In the theoretical chapter federal incentives were identified for the consumption of energy as Federal government actions whose major intent or result is to stimulate energy consumption. The stimulus comes through changing values of variables included in energy demand functions, thereby inducing energy consumers to move along the function in the direction of greater quantity of energy demanded, or through inducing a shift of the function to a position where more energy will be demanded at a given price. The demand variables fall into one of six categories: price of the energy form, price of complements, price of substitutes, preferences, income, and technology. The government can provide such incentives using six different policy instruments: taxation, disbursements, requirements, nontraditional services, traditional services, and market activity. The four major energy forms were examined. Six energy-consuming sectors were examined: residential, commercial, industrial, agricultural, transportation, and public. Two types of analyses of incentive actions are presented in this volume. The generic chapter focused on actions taken in 1978 across all energy forms. The subsequent chapters traced the patterns of incentive actions, energy form by energy form, from the beginning of the 20th century, to the present. The summary chapter includes the results of the previous chapters presented by energy form, incentive type, and user group. Finally, the implications of these results for solar policy are presented in the last chapter. (MCW)

  6. Federal Technology Alert: Ground-Source Heat Pumps Applied to Federal Facilities--Second Edition

    SciTech Connect (OSTI)

    Hadley, Donald L.

    2001-03-01T23:59:59.000Z

    This Federal Technology Alert, which was sponsored by the U.S. Department of Energy's Office of Federal Energy Management Programs, provides the detailed information and procedures that a Federal energy manager needs to evaluate most ground-source heat pump applications. This report updates an earlier report on ground-source heat pumps that was published in September 1995. In the current report, general benefits of this technology to the Federal sector are described, as are ground-source heat pump operation, system types, design variations, energy savings, and other benefits. In addition, information on current manufacturers, technology users, and references for further reading are provided.

  7. Quality Managment Program (QMP) report: A review of quality management programs developed in response to Title 10, Section 35.32 of the Code of Federal Regulations

    SciTech Connect (OSTI)

    Witte, M.C.

    1994-10-01T23:59:59.000Z

    In July of 1991, the Nuclear Regulatory Commission published a Final Rule in the Federal Register amending regulations governing medical therapeutic administrations of byproduct material and certain uses of radioactive sodium iodide. These amendments required implementation of a Quality Management Program (QMP) to provide high confidence that the byproduct material -- or radiation from byproduct material -- will be administered as directed by an authorized user physician. Herein, this rule is referred to as the QM rule. The Final Rule was published after two proposed rules had been published in the Federal Register.

  8. Federal Agency NEPA Procedures

    Broader source: Energy.gov [DOE]

    Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

  9. Generic protocol for environmental audits at federal facilities

    SciTech Connect (OSTI)

    NONE

    1989-08-01T23:59:59.000Z

    The Generic Protocol is a supplement to earlier efforts by EPA to provide technical assistance to Federal agencies on environmental auditing. EPA`s Office of Federal Activities (OFA) issued the Federal Facility Compliance Strategy (referred to as the `Yellow Book`), prepared in 1984 and revised in 1988, as a framework for EPA`s media programs to follow to ensure that Federal facilities are fully integrated into Federal and State compliance monitoring and enforcement activities. The policy encourages Federal agencies to voluntarily develop comprehensive auditing programs to ensure environmental compliance.

  10. Federal Aviation Administration 1

    E-Print Network [OSTI]

    Waliser, Duane E.

    , 2012 Federal Aviation Administration Introduction to the FAA COE CST & NASA Participation Options KenFederal Aviation Administration 1 COE CST Presentation to NASA Date of this revision: March 21 Davidian AST Director of Research Date of this revision: March 21, 2012 #12;Federal Aviation Administration

  11. APPENDIX A DISTRIBUTION LIST Federal Government Agencies Army...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ms. Kim Turner, Assistant Field Supervisor ESA Regulatory Division Bay - Delta Fish & Wildlife Office U.S. Fish and Wildlife Service 650 Capital Mall, Suite 8-300...

  12. Federal Government Congressional Budget Office, Budget Analysis Division Washington, DC

    E-Print Network [OSTI]

    Shyy, Wei

    Charlotte, NC Gallaher Kazakhstan, Security & Brand Integrity Almaty Oblast, Kazakhstan GMMB Washington, DC

  13. 84 ISSUES IN SCIENCE AND TECHNOLOGY he federal government

    E-Print Network [OSTI]

    Kammen, Daniel M.

    of vision on energy is damaging the busi- ness environment for existing and start- up energy companies their invest- ments in energy research and development (R&D) at a time when geopolitics, environ- mental in this sector.Although the Bush admin- istration lists energy research as a"high- priority national need

  14. National Climate Report of the Austrian Federal Government

    E-Print Network [OSTI]

    Keeling, Stephen L.

    of environmentally sound modes of transport. Efficient technologies based on renewable sources of energy are the key¨oner, Sonnblickverein, ZAMG, O¨O. Energiesparverband, Arbeitsgemeinschaft Erneuerbare Energie Layout: M. Kriech the international community will meet in Johannesburg for the World Summit on Sustainable Development ­ one decade

  15. Hydrogen & Fuel Cell Activity USFCC -Matching Federal Government Needs

    E-Print Network [OSTI]

    · 5.2 Million Items ­ eight supply chains · 25M Annual Receipts and Issues · 1411 Weapon Systems Development · ManTech for: ­Infrastructure ­Limited Prod Buys Broad Military Production Base Basic, Applied, and Developmental R&D + Initial Production Buys DOD Potential H2 DOD Technical Transition Model Spin Offs

  16. In This Issue ESRI Summer 2008 GIS for Federal Government

    E-Print Network [OSTI]

    Wright, Dawn Jeannine

    Offers TIGER/Line Shapefiles Online Topologically Integrated Geographic Encoding and Referencing (TIGER)/Line shapefiles are now available for download at www.census.gov/geo/www/tiger/index.html. ESRI users can easily incor- porate TIGER/Line shapefiles into their GIS as supplemental data or as a base layer. This data

  17. Other Solar Resources from the Federal Government | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagementOPAM PolicyOfEnergy Online1ofGeothermal andOther Solar

  18. Federal Government Energy Management Conservation Programs Reports to

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy Chinaof EnergyImpactOnSTATEMENT OF DAVIDThe data dashboardA A 1ChipSteven

  19. Federal Government Increases Renewable Energy Use Over 1000 Percent since

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy Chinaof EnergyImpactOnSTATEMENT OF DAVIDThe data dashboardA A 1ChipSteven1999; Exceeds

  20. Federal Government Project Performance Benchmarks | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy Chinaof EnergyImpactOnSTATEMENT OF DAVIDThe data dashboardA A 1ChipSteven1999;

  1. Federal Government's Energy Consumption Lowest in Almost 40 Years |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy Chinaof EnergyImpactOnSTATEMENT OF DAVIDThe data dashboardA A

  2. Fuel Cell Meeting Agenda: Matching Federal Government Needs with Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport inEnergy0.pdfTechnologies Program (FCTP) (Fact Sheet)UTCLift Trucks:

  3. Request for Information: Federal Government Power Purchase Agreements (PPA)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prevQuickEnergyfor a ManufacturingIssues | Department of

  4. Matching Federal Government Energy Needs with Energy Efficient Fuel Cells |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't YourTransport(FactDepartment3311, 3312), October 20122 DOE Hydrogenis Winding6 * October

  5. Trane - Advancing Today's Federal Government Mission | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOriginEducationVideoStrategic|IndustrialCenter Gets People Work, Teachesand EnergyEnergy

  6. Request for Information: Federal Government Power Purchase Agreements (PPA) Issues

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin ofEnergy at Waste-to-Energy using Fues CellsReportDepartment of Energy

  7. Federal Staffing Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-03T23:59:59.000Z

    This Guide provides an approach to determining the appropriate level and type of federal personnel needed to effectively plan, direct, and oversee project execution. Superseded by DOE G 413.3-19 Admin Chg 1.

  8. Guide on Federal Employee Occupational Medical Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-12-01T23:59:59.000Z

    This Guide supplements the requirements and responsibilities specified in DOE O 341.1, Federal Employee Health Services, dated 12-1-03. This Guide provides preferred implementing methods and procedures. Canceled by DOE G 341.1-1A.

  9. What`s new in federal energy management: FEMP program overview. Federal energy saver showcases

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    To promote widespread Federal energy efficiency, agencies are showcasing their best energy efficiency, water conserving, and solar and other renewable energy technologies. To highlight these successful energy-efficient projects, Executive Order 12902 directs agencies to designate at least one newly constructed or existing building as a showcase facility. At existing facilities, agencies must also try to incorporate cogeneration and indoor air quality improvements. Agencies are directed to develop and implement effective plans to make these showcase projects happen. Project successes will show the strength of partnering with other agencies, energy services companies, utilities, and national laboratories, and of using the US Department of Energy Federal Energy Management Program (FEMP) as a resource. The goal is Federal facilities operating at peak efficiency. A Federal Energy Saver Showcase plaque is prominently displayed at each showcase site, notifying visitors they are entering a government building that successfully conserves energy and water and saves taxpayer dollars.

  10. Cutting the Federal Governments Energy Bill: An Examination of the Sustainable Federal Government Executive Order

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: Theof"Wave theJuly 30,Crafty Gifts forHeavy-Duty| DepartmentAir | Department

  11. Twitter Training for Small Business Federal Contractors

    Broader source: Energy.gov [DOE]

    Twitter can be used to raise brand awareness, share and obtain information on upcoming federal contract opportunities, to network with peers and government leaders, and to help build a reputation for expertise in your field. Put Twitter to work for you! If you are already on Twitter, just getting started on Twitter, or thinking of joining, you can get super ideas on how to make a positive impression, discover more opportunities, team with colleagues, and drive business growth.

  12. High Level Architecture (HLA) federation with Umbra and OPNET federates.

    SciTech Connect (OSTI)

    Oppel, Fred John III; Hart, Brian; Van Leeuwen, Brian P.

    2004-03-01T23:59:59.000Z

    Network-centric systems that depend on mobile wireless ad hoc networks for their information exchange require detailed analysis to support their development. In many cases, this critical analysis is best provided with high-fidelity system simulations that include the effects of network architectures and protocols. In this research, we developed a high-fidelity system simulation capability using an HLA federation. The HLA federation, consisting of the Umbra system simulator and OPNET Modeler network simulator, provides a means for the system simulator to both affect, and be affected by, events in the network simulator. Advances are also made in increasing the fidelity of the wireless communication channel and reducing simulation run-time with a dead reckoning capability. A simulation experiment is included to demonstrate the developed modeling and simulation capability.

  13. Federal Policy and the Rise of Nonprofit Housing Providers

    E-Print Network [OSTI]

    O'Regan, Katherine M.; Quigley, John M.

    2000-01-01T23:59:59.000Z

    of Illinois Press. Quigley, John M. 2000. A Decent Home:Katherine M. O’Regan and John M. Quigley Cummings, Jean L. ,Katherine M. O’Regan and John M. Quigley* Abstract During

  14. FEDERAL PROGRAMS AND FELLOWSHIPS THAT PROVIDE SUPPORT FOR GRADUATE STUDENTS

    E-Print Network [OSTI]

    Spence, Harlan Ernest

    .............................................................................................................. 10 Department of Energy................................................................................................ 17 National Oceanic and Atmospheric Administration..................................................................... 18 National Aeronautics and Space Administration

  15. EPA and OSHA Federally Mandated Training Training provided by

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    Department Job Title Course date and time that you plan to attend Thank you! DATES TIMES LOCATIONS Tuesday, February 28 1:30 PM-4:00 PM Fukushima Auditorium 1901 HSC-S Hazardous Waste - Hazard Communication - Lab

  16. EPA and OSHA Federally Mandated Training Training provided by

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    Department Job Title Course date and time that you plan to attend Thank you! DATES TIMES LOCATIONS Tuesday:00-3:30 p.m. 2118 HSC-N Hazardous Waste - Hazard Communication - Lab Safety #12;

  17. Status of the U.S. Department of Energy (DOE) Government to Government Program in Russia

    SciTech Connect (OSTI)

    Olascoaga, M.T.

    1996-10-01T23:59:59.000Z

    The US-Russian Government-to-Government Program of Cooperation on Nuclear Material Protection, Control, and Accounting (MPC&A) evolved from the Nunn-Lugar Cooperative Threat Reduction Program. In 1995, the US Department of Energy (DOE) assumed responsibility as the executive agent for implementation of the Government-to-Government MPC&A Program, followed by the programmatic responsibility for funding. The Russian Program initially emphasized limited exchanges, demonstrations, and upgrades at low-enriched uranium (LEU) fuel fabrication facility at Elektrostal in 1994. The program has expanded to include upgrades at nuclear facilities across Russia, development of the Russian Methodological Training Center (RMTC) in Obninsk; and cooperation with Gosatomnadzor, the Russian Federal Nuclear Radiation and Safety Authority. This paper describes the overall program including program objectives, approach, and US-Russian participation, with an emphasis on DOE-GAN cooperation.

  18. Executive Order 13186: Responsibilities of Federal Agencies to...

    Open Energy Info (EERE)

    federal agencies to protect migratory birds. Published NA Year Signed or Took Effect 2001 Legal Citation EO 13186 DOI Not Provided Check for DOI availability: http:...

  19. Federal Facility Reporting and Data | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Management Program (FEMP) provides information and tools to help agencies report annual energy and water consumption and resource management efforts within Federal facilities....

  20. What`s new in federal energy management: FEMP program overview. Federal Energy Management Program

    SciTech Connect (OSTI)

    NONE

    1996-08-01T23:59:59.000Z

    The US government has an enormous cost-saving opportunity as the largest energy user in the world. In 1994, the government spent $8 billion for its 500,000 buildings, it vehicles, and process energy. The US Department of Energy (DOE), Federal Energy Management Program (FEMP) reduces the cost of government and makes it work better through energy efficiency, use of renewable energy, and water conservation. FEMP leads Federal energy efficiency efforts and helps Federal energy managers identify and procure the best, most cost-effective energy-saving projects. It does this through proactive problem solving; an aggressive emphasis on increasing the number and quality of projects; and effective partnerships among agencies, utilities, the private sector, and states. Partnerships lead to increased motivation and education and reduced barriers to successful procurement. As the lead organization implementing legislation and Presidential direction for Federal energy efficiency, FEMP administers an interagency energy committee and task force and collaborates with the DOE national energy laboratories. FEMP works with energy service companies, energy savings product manufacturers, and utilities. This partnership will lead to a $1 billion investment by companies willing to invest in return for a share of the energy cost savings. With FEMP project financing, audits, training and technical assistance, and new technology demonstrations, agencies overcome obstacles to achieving widespread energy efficiency.

  1. Federal strategies to increase the implementation of combined heat and power technologies in the United States

    SciTech Connect (OSTI)

    Laitner, J.; Parks, W.; Schilling, J.; Scheer, R.

    1999-07-01T23:59:59.000Z

    Recent interest in combined heat and power (CHP) is providing momentum to efforts aimed at increasing the capacity of this highly-efficient technology. Factors driving this increase in interest include the need to increase the efficiency of the nation's electricity generation infrastructure, DOE Assistant Secretary Dan Reicher's challenge to double the capacity of CHP by 2010, the success of DOE's Advanced Turbine Systems Program in supporting ultra-efficient CHP technologies, and the necessity of finding cost-effective solutions to address climate change and air quality issues. The federal government is committed to increasing the penetration of CHP technologies in the US. The ultimate goal is to build a competitive market for CHP in which policies and regulations support the implementation of a full suite of technologies for multiple applications. Specific actions underway at the federal level include technology strategies to improve CHP data collection and assessment and work with industry to encourage the development of advanced CHP technologies. Policy strategies include changes to federal environmental permitting procedures including CHP-friendly strategies in federal restructuring legislation, supporting tax credits and changes to depreciation requirements as economic incentives to CHP, working with industry to leverage resources in the development of advanced CHP technologies, educating state officials about the things they can do to encourage CHP, and increasing awareness about the benefits of CHP and the barriers limiting its increased implementation.

  2. Federal Railroad Administration

    Broader source: Energy.gov (indexed) [DOE]

    mandated the study. Federal Railroad Administration DOT Reorganization DOT is in the process of looking at reorganizing the Department to try to achieve even greater...

  3. Federal Employee Health Services

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-10-18T23:59:59.000Z

    The order establishes requirements and responsibilities for occupational medical, employee assistance, and workers' compensation programs for Federal employees. Cancels DOE O 341.1.

  4. Federal Railroad Administration

    Broader source: Energy.gov (indexed) [DOE]

    very similar to this bill in regard to the core provisions Core provisions: Review and reform the Federal hours of service requirements Establish a new risk reduction program...

  5. Federal NEPA Contacts

    Broader source: Energy.gov [DOE]

    CEQ and most Federal agencies identify primary points of contact for NEPA compliance. Normally a senior environmental professional, environmental law attorney, or member of agency leadership, these...

  6. Green Roofs: Federal Energy Management Program (FEMP) Federal Technology Alert

    SciTech Connect (OSTI)

    Scholz-Barth, K.; Tanner, S.

    2004-09-01T23:59:59.000Z

    In a ''green roof,'' a layer of vegetation (e.g., a roof garden) covers the surface of a roof to provide shade, cooler indoor and outdoor temperatures, and effective storm-water management to reduce runoff. The main components are waterproofing, soil, and plants. There are two basic kinds: intensive and extensive. An intensive green roof often features large shrubs and trees, and it can be expensive to install and maintain. An extensive green roof features shallow soil and low-growing, horizontally spreading plants that can thrive in the alpine conditions of many rooftops. These plants do not require a lot of water or soil, and they can tolerate a significant amount of exposure to the sun and wind. This Federal Technology Alert focuses on the benefits, design, and implementation of extensive green roofs and includes criteria for their use on federal facilities.

  7. Governance of Adjustments

    E-Print Network [OSTI]

    Wernerfelt, Birger

    2003-03-14T23:59:59.000Z

    The article proposes a research program to compare game forms in terms of their ability to govern ex post adjustments to ex ante contracts. The comparisons can be ...

  8. Federal Energy-Saving Program Keeps Federal Government on Pace to $4

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd ofEvaluations in Covered FacilitiesAfter 12Jeffrey DeVore,StevenBillion

  9. Federal Technical Capability

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-11-19T23:59:59.000Z

    This directive defines requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Cancels DOE M 426.1-1A, Federal Technical Capability Manual.

  10. Presidential Documents Federal Register

    E-Print Network [OSTI]

    Presidential Documents 67249 Federal Register Vol. 65, No. 218 Thursday, November 9, 2000 Title 3 principles set forth in section 2, agencies shall adhere, to the extent permitted by law, to the following #12;67250 Federal Register / Vol. 65, No. 218 / Thursday, November 9, 2000 / Presidential Documents (a

  11. Electricity Advisory Committee - Federal Register Notices | Department...

    Energy Savers [EERE]

    Federal Register Notices Electricity Advisory Committee - Federal Register Notices Electricity Advisory Committee - Federal Register Notices February 17, 2015 Electricity Advisory...

  12. Federal Funding in Response to Hurricane Katrina: Utilization by New Orleans Residents

    E-Print Network [OSTI]

    Beauchamp, Krystle; Chavez, Leslie; Dye, Wendy; Lamon, Matt; Mallas, Liz; Stephens, Caroline

    2007-01-01T23:59:59.000Z

    Hurricane Andrew ............................................................................................................. 81 Northridge Earthquake ...................................................................................................... 83... Hurricane Katrina: A Study of the Awareness, Participation and Satisfaction of Federally Funded Programs Bush School of Government and Public Service Texas A&M University Krystle Beauchamp...

  13. Landmark Tribal Wind Energy Deal Paves the Way for Tribal-Federal...

    Energy Savers [EERE]

    Warren Gretz, NREL 07317. What are the key facts? The 10-year GSA contract is the first power purchase agreement between a tribal entity and federal government. The contract will...

  14. Local government and demand-side bidding

    SciTech Connect (OSTI)

    Vine, E.

    1990-12-01T23:59:59.000Z

    As part of Lawrence Berkeley Laboratory's (LBL) technical assistance to the Sustainable City Project, the issue of DSM bidding was examined as a possible option for local government. The recent interest and activity in DSM bidding around the country presents an opportunity for local government. Potential benefits for local government include increased installation of energy efficiency measures in municipal facilities and in the community, economic development, an additional source of revenue to help pay for municipal programs (including additional conservation efforts), and an enhanced local image. Local government will most likely participate in DSM bidding as a customer or as a client of an energy service company (ESCO). The exact role will depend on local government's response to key issues associated with DSM bidding, such as performance guarantees, quality assurance procedures (measuring savings and providing financial security), and the administrative burden. In addition, local government will have to weigh the advantages and disadvantages of working with an ESCO. While local government has not yet participated in DSM bidding, local government is in a unique position to take advantage of energy efficiency opportunities as owner-operators of municipal facilities which consume significant amounts of energy, planners and regulators of new development, and general providers of services and assistance to their communities. Furthermore, local governments have lower risks (in terms of program success) than small businesses, and local governments' credibility and experience in dealing with customers may reduce high transaction costs associated with DSM bidding. Despite these advantages, local governments should take a cautious approach in participating in DSM bidding processes, and should carefully examine other strategies for promoting energy efficiency (including participation in conventional utility programs) prior to participating in DSM bidding.

  15. Gregory H. Friedman: Provided for The Committee on Oversight...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Committee on Oversight and Government Reform U.S. House of Representatives Gregory H. Friedman: Provided for The Committee on Oversight and Government Reform U.S. House of...

  16. Federal Activities in the Bioeconomy

    Broader source: Energy.gov [DOE]

    Plenary V: Federal Activities in the Bioeconomy Federal Activities in the Bioeconomy Zia Haq, Senior Analyst, Technology Manager, Bioenergy Technologies Office, U.S. Department of Energy

  17. Addressing the Federal-State-Local Interface Issues During a Catastrophic Event Such as an Anthrax Attack

    SciTech Connect (OSTI)

    Stein, Steven L.; Lesperance, Ann M.; Upton, Jaki F.

    2010-02-01T23:59:59.000Z

    On October 9, 2008, federal, state and local policy makers, emergency managers, and medical and public health officials convened in Seattle, Washington, for a workshop on Addressing the Federal-State-Local Interface Issues During a Catastrophic Event Such as an Anthrax Attack. The day-long symposium was aimed at generating a dialogue about recovery and restoration through a discussion of the associated challenges that impact entire communities, including people, infrastructure, and critical systems. The Principal Federal Official (PFO) provided an overview of the role of the PFO in a catastrophic event. A high-level summary of an anthrax scenario was presented. The remainder of the day was focused on interactive discussions among federal, state and local emergency management experts in the areas of: • Decision-making, prioritization, and command and control • Public health/medical services • Community resiliency and continuity of government. Key topics and issues that resulted from discussions included: • Local representation in the Joint Field Office (JFO) • JFO transition to the Long-Term Recovery Office • Process for prioritization of needs • Process for regional coordination • Prioritization - process and federal/military intervention • Allocation of limited resources • Re-entry decision and consistency • Importance of maintaining a healthy hospital system • Need for a process to establish a consensus on when it is safe to re-enter. This needs to be across all jurisdictions including the military. • Insurance coverage for both private businesses and individuals • Interaction between the government and industry. The symposium was sponsored by the Interagency Biological Restoration Demonstration, a collaborative regional program jointly funded by the U.S. Department of Homeland Security and the U.S. Department of Defense. To aid the program’s efforts and inform the development of blueprint for recovery from a biological incident, this report presents the key issues identified at the symposium.

  18. A Survey on Cloud Provider Security

    E-Print Network [OSTI]

    A Survey on Cloud Provider Security Measures Alex Pucher, Stratos Dimopoulos Abstract Cloud take advantage of this model already, but security and privacy concerns limit the further adoption agencies and start offering security certifications and separate tightly controlled "government" cloud

  19. A Brief History of the Federal Columbia River Power System

    E-Print Network [OSTI]

    of regional cooperation to meet the needs of electric power production, land reclamation, flood control, navigation, recreation, and other river uses. From the beginning, the federal government has played a major facilities, beginning in the late 1800s. Congress directed the Bonneville Power Administration

  20. Federal ESPC Process Phase 4: Project Implementation and Construction

    Broader source: Energy.gov [DOE]

    Phase 4 of the energy savings performance contract (ESPC) process focuses on project implementation and construction. At this point, an ESPC project is much like any other construction project. In fact, the U.S. Department of Energy’s (DOE) indefinite-delivery, indefinite-quantity (IDIQ) ESPC contains the Federal Acquisition Regulations (FAR) clauses that normally appear in any government construction project.

  1. Perhaps federal research grants can include infrastructure costs.

    E-Print Network [OSTI]

    Sur, Mriganka

    Perhaps federal research grants can include infrastructure costs. There are signs to find favour in China, a country beset by similar problems. The particular structure of Indian science and healthystart-uppackages. The government could contribute to these costs. 487 NATURE|Vol 436|28 July 2005

  2. Management of government personal property in the hands of contractors. Handbook for contracting officers and staff

    SciTech Connect (OSTI)

    Not Available

    1982-04-01T23:59:59.000Z

    This manual is divided into three parts. Part One applies to the management of Government personal property within the Department of Energy in general terms. Part Two describes the specifics of the application of personal property management techniques to On-Site Contractors. Part three applies to Off-Site Contractors. Part One introduces the field of property management. It discusses: the legal basis and requirements established by Federal Statutes and the parallel authorities and responsibilities; the related evolution of the Department of Energy; the regulation system within the Federal Government and its implementation by the Department for personal property management. The life cycle of equipment is presented and how control over personal property is maintained through an accountability system. Classifications of property and contract clauses are discussed. The relationships of contracting officers and property administrators with contractors are presented in each of the discussions as appropriate. Part One consists of only one chapter and is applicable to the management of property utilized by all types of contractors. It provides the foundation to explore in some detail the actions and interactions that occur between the Department's procurement and property personnel and those of the contractor. This exploration in depth is made in Parts Two and Three.

  3. Federal Employee Health Services

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-12-01T23:59:59.000Z

    To establish requirements and responsibilities for occupational medical, employee assistance, and workers' compensation programs for Federal employees. Cancels DOE 3790.1B. Canceled by DOE O 341.1A.

  4. Federal Protective Force

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-07-15T23:59:59.000Z

    This Manual establishes requirements for the management and operation of the Department of Energy (DOE) Federal protective forces (FPFs). Cancels DOE M 470.4-3, Chg 1. Canceled by DOE O 473.3.

  5. Presidential Documents Federal Register

    E-Print Network [OSTI]

    Presidential Documents 67249 Federal Register Vol. 65, No. 218 Thursday, November 9, 2000 Title 3 principles set forth in section 2, agencies shall adhere, to the extent permitted by law, to the following

  6. Using federal technology policy to strength the US microelectronics industry

    SciTech Connect (OSTI)

    Gover, J.E.; Gwyn, C.W.

    1994-07-01T23:59:59.000Z

    A review of US and Japanese experiences with using microelectronics consortia as a tool for strengthening their respective industries reveals major differences. Japan has established catch-up consortia with focused goals. These consortia have a finite life targeted from the beginning, and emphasis is on work that supports or leads to product and process-improvement-driven commercialization. Japan`s government has played a key role in facilitating the development of consortia and has used consortia promote domestic competition. US consortia, on the other hand, have often emphasized long-range research with considerably less focus than those in Japan. The US consortia have searched for and often made revolutionary technology advancements. However, technology transfer to their members has been difficult. Only SEMATECH has assisted its members with continuous improvements, compressing product cycles, establishing relationships, and strengthening core competencies. The US government has not been a catalyst nor provided leadership in consortia creation and operation. We propose that in order to regain world leadership in areas where US companies lag foreign competition, the US should create industry-wide, horizontal-vertical, catch-up consortia or continue existing consortia in the six areas where the US lags behind Japan -- optoelectronics, displays, memories, materials, packaging, and manufacturing equipment. In addition, we recommend that consortia be established for special government microelectronics and microelectronics research integration and application. We advocate that these consortia be managed by an industry-led Microelectronics Alliance, whose establishment would be coordinated by the Department of Commerce. We further recommend that the Semiconductor Research Corporation, the National Science Foundation Engineering Research Centers, and relevant elements of other federal programs be integrated into this consortia complex.

  7. FEMP Update: Federal Energy Management activities, July 1985

    SciTech Connect (OSTI)

    Not Available

    1985-01-01T23:59:59.000Z

    Since early 1984, FEMP has examined a number of innovative techniques for financing energy efficiency improvements in Federal facilities. Having identified a number of legal and procurement barriers to shared savings contracting by Federal agencies, FEMP set out to identify and explore possible solutions. Currently, it has narrowed in on three specific options which represent potentially viable approaches to Federal energy financing: (1) removing regulatory and institutional barriers to energy services contracts with the private sector; (2) implementing energy services agreements at Government Owned Contractor Operated (GOCO) facilities; and (3) establishing a government financial corporation to fund agency energy conservation investments. These possible solutions are discussed in the report. The third possibility is regarded as unlikely.

  8. CONVERSION OF DOE TECHNICAL STANDARDS TO NON-GOVERNMENT STANDARDS

    Broader source: Energy.gov [DOE]

    PurposeThis procedure provides guidance on the conversion of DOE Technical Standards to Voluntary Consensus Standards (VCSs), also referred to as non-Government standards. 

  9. A Multiple Network Approach to Corporate Governance

    E-Print Network [OSTI]

    Bonacina, Fausto; Moretto, Enrico; Stefani, Silvana; Torriero, Anna

    2014-01-01T23:59:59.000Z

    In this work, we consider Corporate Governance ties among companies from a multiple network perspective. Such a structurenaturally arises from the close interrelation between the Shareholding Network and the Board of Directors network. Inorder to capture the simultaneous effects on both networks on Corporate Governance, we propose to model the Corporate Governance multiple network structure via tensor analysis. In particular, we consider the TOPHITS model, based on the PARAFAC tensor decomposition, to show that tensor techniques can be successfully applied in this context. After providing some empirical results from the Italian financial market in the univariate case, we will show that a tensor-based multiple network approach can reveal important information.

  10. Survey of Postdoctorates at FFRDCs: Final Report [Federally Funded Research and Development Centers

    SciTech Connect (OSTI)

    Mulrow, Jeri

    2010-06-30T23:59:59.000Z

    The 2009 FFRDC survey collected the total number of postdocs employed by FFRDCs in the United States—categorized by source of support, citizenship, sex, and field of research—as of October 1, 2009. The universe for the 2009 GSS-FFRDC survey was the Master Government List of Federally Funded Research and Development Centers. The 2009 survey also contacted the NIH’s Intramural Research Program because it employs the largest number of postdocs in the federal government. The FFRDC survey collected data via a web instrument. Topics included the type of support the postdocs received (federal and nonfederal), their sex, citizenship, race/ethnicity, and field of research.

  11. Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook (Book)

    SciTech Connect (OSTI)

    Daley, R.; Ahdieh, N.; Bentley, J.

    2014-01-01T23:59:59.000Z

    A comprehensive Federal Fleet Management Handbook that builds upon the "Guidance for Federal Agencies on E.O. 13514 Section 12-Federal Fleet Management" and provides information to help fleet managers select optimal greenhouse gas and petroleum reduction strategies for each location, meeting or exceeding related fleet requirements, acquiring vehicles to support these strategies while minimizing fleet size and vehicle miles traveled, and refining strategies based on agency performance.

  12. SAVEnergy Action Plans: Implementing audits in federal facilities

    SciTech Connect (OSTI)

    Mayo, K H

    1994-07-01T23:59:59.000Z

    The Department of Energy`s Federal Energy Management Program is charged with implementing key sections of the Energy Policy Act of 1992 and all of the Executive Order 12902, to make the Federal Government operate more energy and water efficient. A congressionally-mandated energy, renewables, and water conservation audit program is one component of this plan. The SAVEnergy Action Plan is designed to help energy managers identify specific energy and water projects and link these projects to appropriate funding mechanisms for implementation. FEMP`s SAVEnergy staff has been working with Federal agencies to develop strategies to complete their legislatively-mandated goals, both through FEMP`s programs and other programs available to the Federal sector.

  13. M&V Guidelines: Measurement and Verification for Federal Energy Projects

    Broader source: Energy.gov [DOE]

    Document describes the Federal Energy Management Program's (FEMP) standard procedures and guidelines for measurement and verification (M&V) for federal energy managers, procurement officials, and energy service providers.

  14. Demand Response in the U.S.- Key trends and federal facility participation

    Broader source: Energy.gov [DOE]

    Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—provides demand response (DR) definition, current status of DR in the United States, key DR trends, and federal participation issues.

  15. Governance & Policies Effective: October 1997

    E-Print Network [OSTI]

    Hardy, Christopher R.

    Governance & Policies Effective: October 1997 University Governance DEANS' COUNCIL Approved: October 1997 Revised: November 22, 2006 University Provost The Deans' Council is an assembly of the chief

  16. Federal Response Assets for a Radioactive Dispersal Device Incident

    SciTech Connect (OSTI)

    Sullivan,T.

    2009-06-30T23:59:59.000Z

    If a large scale RDD event where to occur in New York City, the magnitude of the problem would likely exceed the capabilities of City and State to effectively respond to the event. New York State could request Federal Assistance if the United States President has not already made the decision to provide it. The United States Federal Government has a well developed protocol to respond to emergencies. The National Response Framework (NRF) describes the process for responding to all types of emergencies including RDD incidents. Depending on the location and type of event, the NRF involves appropriate Federal Agencies, e.g., Department of Homeland Security (DHS), the Department of Energy (DOE), Environmental Protection Agency (EPA), United States Coast Guard (USCG), Department of Defense (DOD), Department of Justice (DOJ), Department of Agriculture (USDA), and Nuclear Regulatory Commission (NRC). The Federal response to emergencies has been refined and improved over the last thirty years and has been tested on natural disasters (e.g. hurricanes and floods), man-made disasters (oil spills), and terrorist events (9/11). However, the system has never been tested under an actual RDD event. Drills have been conducted with Federal, State, and local agencies to examine the initial (early) phases of such an event (TopOff 2 and TopOff 4). The Planning Guidance for Protection and Recovery Following Radiological Dispersal Device (RDD) and Improvised Nuclear Device (IND) incidents issued by the Department of Homeland Security (DHS) in August 2008 has never been fully tested in an interagency exercise. Recently, another exercise called Empire 09 that was situated in Albany, New York was conducted. Empire 09 consists of 3 different exercises be held in May and June, 2009. The first exercise, May 2009, involved a table top exercise for phase 1 (0-48 hours) of the response to an RDD incident. In early June, a full-scale 3- day exercise was conducted for the mid-phase response (48 hours +). A few weeks later, a one day full-scale exercise was conducted for the late phase (recovery) response to an RDD event. The lessons learned from this study are not available as of June 30, 2009. The objective of this report is to review and summarize anticipated Federal and State response actions and the roles and responsibilities of various agencies (DHS, EPA, DOE, NY-DEP, NY-DEC) with respect to decontamination issues that would arise from a radiological dispersion device (RDD), e.g., dirty bomb attack. These issues arise in the late phase of the response (48 hours and beyond) after the area has been stabilized and forensic information has been obtained. Much of the information provided in this report is taken directly from published guidance that is readily available.

  17. Reforming The Government Hiring Process

    Broader source: Energy.gov [DOE]

    The Department of Energy explains efforts made to simplify the federal hiring process within the Department, complete with video.

  18. Thermal Energy Storage for Space Cooling--Federal Technology Alert

    SciTech Connect (OSTI)

    Brown, Daryl R

    2000-12-31T23:59:59.000Z

    Cool storage technology can be used to significantly reduce energy costs by allowing energy-intensive, electrically driven cooling equipment to be predominantly operated during off peak hours when electricity rates are lower. This Federal Technology Alert, which is sponsored by DOE's Federal Energy Management Program (FEMP), describes the basic types of cool storage technologies and cooling system integration options. In addition, it defines the savings potential in the federal sector, presents application advice, and describes the performance experience of specific federal users. The results of a case study of a GSA building using cool storage technology are also provided.

  19. Thermal Energy for Space Cooling--Federal Technology Alert

    SciTech Connect (OSTI)

    Brown, Daryl R.

    2000-12-31T23:59:59.000Z

    Cool storage technology can be used to significantly reduce energy costs by allowing energy-intensive, electrically driven cooling equipment to be predominantly operated during off peak hours when electricity rates are lower. This Federal Technology Alert, which is sponsored by DOE's Federal Energy Management Program (FEMP), describes the basic types of cool storage technologies and cooling system integration options. In addition, it defines the savings potential in the federal sector, presents application advice, and describes the performance experience of specific federal users. The results of a case study of a GSA building using cool storage technology are also provided.

  20. Chronological History of Federal Fleet Actions and Mandates (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2011-04-01T23:59:59.000Z

    This chronological history of Federal fleet actions and mandates provides a year-by-year timeline of the acts, amendments, executive orders, and other regulations that affect Federal fleets. The fleet actions and mandates included in the timeline span from 1988 to 2009.

  1. Drug-Free Federal Workplace Testing Implementation Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-07-29T23:59:59.000Z

    The order provides guidance and policy for the administration, application and implementation of the DOE Drug-free Federal Workplace Plan and other regulations that facilitate the maintenance of a drug-free Federal workplace through the establishment of programs to test for the use of illegal drugs. Chg 1, dated 8-21-92

  2. Attributes of the Federal Energy Management Program's Federal Site Building Characteristics Database

    SciTech Connect (OSTI)

    Loper, Susan A.; Sandusky, William F.

    2010-12-31T23:59:59.000Z

    Typically, the Federal building stock is referred to as a group of about one-half million buildings throughout the United States. Additional information beyond this level is generally limited to distribution of that total by agency and maybe distribution of the total by state. However, additional characterization of the Federal building stock is required as the Federal sector seeks ways to implement efficiency projects to reduce energy and water use intensity as mandated by legislation and Executive Order. Using a Federal facility database that was assembled for use in a geographic information system tool, additional characterization of the Federal building stock is provided including information regarding the geographical distribution of sites, building counts and percentage of total by agency, distribution of sites and building totals by agency, distribution of building count and floor space by Federal building type classification by agency, and rank ordering of sites, buildings, and floor space by state. A case study is provided regarding how the building stock has changed for the Department of Energy from 2000 through 2008.

  3. Federal Fiduciary Duties for Directors

    E-Print Network [OSTI]

    Sale, Hillary

    2006-01-01T23:59:59.000Z

    Decisionmaking in Corporate Governance, 55 V AND . L. R EV .at the UCLA Sloan Corporate Governance Colloquium. In theThe Means and Ends of Corporate Governance, 97 N W . U. L. R

  4. Florida Atlantic University Student Government

    E-Print Network [OSTI]

    Fernandez, Eduardo

    and responsibilities designated by the Student Government Constitution and this Chapter of the Student Body Statutes

  5. Federal Technical Capability

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-11-19T23:59:59.000Z

    To define requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Chg. 1 dated 9-20-11 Cancels DOE O 426.1. Cancels DOE P 426.1.

  6. da Reitoria UNIVERSIDADE FEDERAL

    E-Print Network [OSTI]

    Floeter, Sergio Ricardo

    Aperfeiçoamento Institucional. A PRESIDENTE DO CONSELHO UNIVERSITÁRIO da Universidade Federal de Santa Catarina, mudando o nome da Secretaria Especial de Aperfeiçoamento Institucional para "Secretaria de Aperfeiçoamento) Secretaria de Relações Internacionais; c) Secretaria de Gestão de Pessoas; d) Secretaria de Aperfeiçoamento

  7. Federal Employee Training

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-07-06T23:59:59.000Z

    This Order establishes requirements and responsibilities for DOE Federal employee training in accordance with Chapter 41 of Title 5, United States Code (U.S.C.). Cancels DOE O 360.1B and DOE M 360.1-1B.

  8. Governance & Policies Effective: 1997

    E-Print Network [OSTI]

    Hardy, Christopher R.

    stakeholders, review, evaluate, and recommend changes, adjustments, and updates to the General EducationGovernance & Policies Effective: 1997 Faculty Senate General Education Review Committee Approved of the term. 2. Faculty Representatives: Two members from each of the four academic units (Education

  9. Governance and Environmental Sustainability

    E-Print Network [OSTI]

    in their adoption of environmental protection and natural resource conservation policies? · If variation in cityGovernance and Environmental Sustainability Ann Bowman Kennedy Chair at the Bush School #12;Outline Policymakers and specific environmental media Implementation Local communities and multi- media #12

  10. Federal Memorandum of Understanding for Hydropower/Federal Inland...

    Open Energy Info (EERE)

    of Energy Environmental Protection Agency Federal Energy Regulatory Commission Fish and Wildlife Service Forest Service National Oceanic and Atmospheric Administration...

  11. Federal Register Notices | Department of Energy

    Office of Environmental Management (EM)

    Information Center Library Federal Register Notices Federal Register Notices May 22, 2015 Electricity Advisory Committee Notice of Open Meeting June 29 and 30, 2015: Federal...

  12. Federal Utility Partnership Working Group Participants | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Participants Federal Utility Partnership Working Group Participants The following Federal agencies have participated in the Federal Utility Partnership Working Group or engaged in...

  13. Federal Utility Partnership Working Group Seminar: Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Utility Partnership Working Group Seminar: Chairman's Corner Federal Utility Partnership Working Group Seminar: Chairman's Corner Presentation covers the Federal Utility...

  14. Restructuring, Tight Budgets and Executive Order 13123 Create New Incentives to Reduce Waste in Federal Industrial Facilities

    E-Print Network [OSTI]

    Verdict, M. E.

    This paper discusses the positive impact that electric utility industry restructuring, a reduction in the size of government operations, and the recent Presidential Executive Order 13123 should have on energy use in Federal industrial facilities...

  15. Meeting Federal Energy Security Requirements

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

  16. Federal Utility Partnership Working Group

    Broader source: Energy.gov [DOE]

    The Federal Utility Partnership Working Group (FUPWG) establishes partnerships and facilitates communications among Federal agencies, utilities, and energy service companies. The group develops strategies to implement cost-effective energy efficiency and water conservation projects through utility incentive programs at Federal sites.

  17. Worker Protection Management for DOE Federal and Contractor Employees

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-03-27T23:59:59.000Z

    Establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses, and accidental losses by providing DOE Federal and contractor workers with a safe and healthful workplace. Cancels DOE O 440.1.

  18. Federal Fuels Taxes and Tax Credits (released in AEO2009)

    Reports and Publications (EIA)

    2009-01-01T23:59:59.000Z

    Provides a review and update of the handling of federal fuels taxes and tax credits, focusing primarily on areas for which regulations have changed or the handling of taxes or credits has been updated in Annual Energy Outlook 2009.

  19. Federal offshore oil and gas lease bonus bid rejections: viewpoints of bidders and owners

    SciTech Connect (OSTI)

    Lohrenz, J.; Dougherty, E.L.

    1983-03-01T23:59:59.000Z

    The Federal Government currently estimates values of leases offered in offshore oil and gas sales. After sales, the estimates are compared with highest bonus bids to decide whether to issue a lease or not. Over the past decade the Government has opted via this process not to issue leases on approximately one out of seven leases receiving bonus bids. The Government avows this assures fair market value is received. The authors believe this avowal is hogwash. The authors support this belief with logical argument, quantitative analysis, and statistical study. They conclude that by following the current policy, the Federal Government acting as agent for all of us, the collected people and owners of the lands in question, is acting to the detriment of the account they should serve. Alternative policies are proposed which both increase the efficiency of bringing offshore oil and gas resources to use and decrease the expense the Government burdens the owners with.

  20. Federal offshore statistics: 1995 - leasing, exploration, production, and revenue as of December 31, 1995

    SciTech Connect (OSTI)

    Gaechter, R.A.

    1997-07-01T23:59:59.000Z

    This report provides data on federal offshore operations for 1995. Information is included for leasing activities, development, petroleum and natural gas production, sales and royalties, revenue from federal offshore leasing, disbursement of federal revenues, reserves and resource estimates, and oil pollution in U.S. and international waters.

  1. The 1987 Federal field exercise: The DOE experience

    SciTech Connect (OSTI)

    Adler, M.V.; Gant, K.S.

    1989-06-01T23:59:59.000Z

    The second full-scale field exercise of the Federal Radiological Emergency Response Plan (FRERP) was held at the Zion Nuclear Power Station, Zion, Illinois, in June 1987. The exercise incorporated the annual compliance exercise for the Zion plant and involved the operating utility, Commonwealth Edison Company, the states of Illinois and Wisconsin, local governments, volunteer groups, and representatives from 12 federal agencies. The 3-day exercise was played from many locations in the Zion area; Springfield, Illinois; Madison, Wisconsin; and Washington, DC. Approximately 1000 people participated in the exercise, which used a scenario in which an accident at the plant resulted in the release of radioactive material outside the plant boundary. The US Department of Energy (DOE) had major responsibilities during the planning, playing, and critiquing of the exercise; these functions are outlined in the report. This document describes the DOE participation in the planning and response during the exercise. During a radiological emergency, the FRERP gives DOE the responsibility for coordinating the federal radiological monitoring and assessment activities in support of the states and the cognizant federal agency. At Zion, a self-sufficient Federal Radiological Monitoring and Assessment Center was established by DOE at a nearby fairground in which over 200 people from DOE, the two states, and other federal agencies participated. Before the field exercise, a tabletop exercise and a dry run were held for training purposes. 5 refs., 6 figs.

  2. Valuation of Government Policies and Projects

    E-Print Network [OSTI]

    Lucas, Deborah J.

    Governments play a central role in the allocation of capital and risk in the economy. Evaluating the cost to taxpayers of government investments requires an assumption about the government’s cost of capital. Governments ...

  3. Interoperability and the Federal Role

    SciTech Connect (OSTI)

    Ton, Dan; Irwin, Chris; Widergren, Steven E.

    2010-07-25T23:59:59.000Z

    A smart grid is capable of integrating a broad array of generation resources and enables the participation of demand side resources in reliable system operation. To cost effectively realize this flexibility, the associated devices and systems need to connect and interact simply and reliably. Interoperability is the important ingredient to make this happen. Because the electric system transcends organizational boundaries between generators, electricity delivery companies, end-users, and other service providers, advancing interoperability between these organizations can be difficult to justify by individual organizations. But given the importance of a smart electric system to meet national economic, societal, and environmental objectives, a federal role is taking shape in the United States to improve the integration of automation elements and thus make smart grid a reality

  4. Executive Order 13423- Strengthening Federal Environmental, Energy...

    Energy Savers [EERE]

    423- Strengthening Federal Environmental, Energy, and Transportation Management Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management It...

  5. University Policy No.: GV0225 Classification: Governance

    E-Print Network [OSTI]

    Victoria, University of

    University Policy No.: GV0225 Classification: Governance Approving Authority: Board of Governors RISK MANAGEMENT POLICY Effective Date: March/07 Supersedes: April/04 Last Editorial Change: Mandated Review: Purpose 1.00 The main purpose of this policy is to provide direction to the members

  6. GOVERNMENT OF CANADA INVESTMENT PAYS OFF AS

    E-Print Network [OSTI]

    GOVERNMENT OF CANADA INVESTMENT PAYS OFF AS SFU RESEARCH COMES OF AGE November 2013 of Canada allow us to provide the tools and support researchers need to stay at the cutting edge and transformative outputs that stimulate Canada's innovation ecosystem. As SFU nears its 50th anniversary in 2015

  7. PACE and the Federal Housing Finance Agency (FHFA)

    SciTech Connect (OSTI)

    Zimring, Mark; Fuller, Merrian

    2010-03-17T23:59:59.000Z

    The FHFA regulates Fannie Mae, Freddie Mac, and the 12 Federal Home Loan Banks (the government-sponsored enterprises - GSEs). On June 18, 2009, James B. Lockhart III, then Director of FHFA, released a letter expressing concern about the negative impact of energy loan tax assessment programs (ELTAPs) - also known as Property Assessed Clean Energy (PACE) programs - on both the housing finance system and homeowner program participants. Subsequently, a number of PACE proponents responded to the concerns laid out in the FHFA letter. In early Fall 2009, word circulated that FHFA was planning to follow its June letter with guidance to other agencies, possibly including Fannie Mae and Freddie Mac, discouraging them from buying loans on properties subject to PACE-type assessment liens. This triggered a second round of stakeholder letters, several of which were addressed to President Obama. On October 18, 2009, the White House, in what some believe was an attempt to obviate the need for FHFA guidance, released a Policy Framework for PACE Financing Programs that outlined best practices guidance for homeowner and lender protection. As of February 2010, FHFA and the GSEs have agreed to monitor PACE programs and work with stakeholders and the Administration to consider additional guidance beyond the Policy Framework and to collect more information on PACE program efficacy and risks. A summary of the communications timeline and highlights of the communications are provided.

  8. Corporate governance and banking regulation

    E-Print Network [OSTI]

    Alexander, Kern

    The globalisation of banking markets has raised important issues regarding corporate governance regulation for banking institutions. This research paper addresses some of the major issues of corporate governance as it relates to banking regulation...

  9. From {open_quotes}command and control{close_quotes} to risk management: The evolution of the federal natural gas pipeline safety program

    SciTech Connect (OSTI)

    Biancardi, P.; Bogardus, L.M.

    1995-12-31T23:59:59.000Z

    The pipeline industry essentially accepted the passage of the NGPSA in 1968 because it would provide one set of uniform regulations under the shield of federal preemption, thus relieving industry from the impossible burden of complying with inconsistent state and local requirements. The program developed, however, in response to the public`s misperception of infrequent but highly publicized accidents, rather than as a result of rational evaluation of actual pipeline safety risks. Like other federal agencies, the DOT has begun to reassess this method of regulation and today has a new vision of pipeline safety regulation. The DOT has embarked on a regulatory experiment which requires government-industry partnerships, greater public participation, and risk-based regulations. Whether or not this experiment succeeds, the DOT deserves credit for seeking new and innovative approaches to regulating the pipeline industry.

  10. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    SciTech Connect (OSTI)

    NONE

    1998-02-24T23:59:59.000Z

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  11. HUD Tribal Government to Government Consultation Policy Request for Comments

    Broader source: Energy.gov [DOE]

    The U.S. Department of Housing and Urban Development (HUD) request for comments is to enhance communication and coordination between HUD and federally recognized Indian Tribes, and to outline guiding principles and procedures under which all HUD employees are to operate with regard to federally recognized Indian or Alaska Native Tribes. Comments are due June 8, 2015.

  12. Government Funding Opportunity Announcements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC) Environmental AssessmentsGeoffrey(SC) GettingGit GitGlobalGoldenGovernment

  13. Unied States Government

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona,Site Operations Guide Doc.5 R A DUnied States Government

  14. First interim report of the Federal Fleet Conversion Task Force

    SciTech Connect (OSTI)

    Not Available

    1993-08-01T23:59:59.000Z

    The Federal Fleet Conversion Task Force was created by Executive Order 12844, signed by President Clinton on April 21, 1993. In the Order, the President directed that purchases of alternative fueled vehicles by the Federal Government be substantially increased beyond the levels required by current law. The President charged the Task Force with developing recommendations for carrying out the Executive Order, with special emphasis on setting a course that will lead to the widespread use of alternative fueled vehicles by Federal, State, and local government fleets, by private fleets and, ultimately, by individuals. The chief recommendation of the Task Force is the establishment of a Presidential Clean Cities Initiative. To support creation of the Presidential Initiative, the Task Force identified 38 cities and regions, prioritized into three tiers, for concentrating the Initiative`s efforts in Fiscal Years 1994 through 1996. This concentration of effort is key to the effectiveness of the Initiative. The 38 cities and regions would receive priority funding for Federal vehicle purchases and for infrastructure development. In addition, the Task Force has made specific recommendations for overcoming numerous regulatory, economic, and technical barriers that have slowed the introduction of alternative fueled vehicles into general use.

  15. Executive Order 13514 Section 9 Recommendations: Federal Greenhouse Gas Accounting and Reporting

    Broader source: Energy.gov [DOE]

    Presentation covers the Executive Order 13514 Section 9 Recommentdations, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

  16. Public and political issues in radioactive waste management in the Federal Republic of Germany

    SciTech Connect (OSTI)

    Neis, A. [Federal Ministry for the Environment, Nature Conservation and Nuclear Safety, Bonn (Germany)

    1993-12-31T23:59:59.000Z

    The Federal Government`s radioactive waste management concept and regulations governing formal public participation in licensing procedures for radioactive waste management facilities are presented. The paper focuses on public and political issues arising from widely diverging views in different social groups on nuclear energy and on radioactive waste management. The resulting conflict between Federal and Laender (Federal constituent states) authorities and the actual course of public participation in a licensing procedure are illustrated with the example of planned final disposal of radioactive waste in the Konrad mine. Major national efforts to overcome the unsatisfying present situation are presented and the role of international consensus is briefly touched. Concluding remarks will particularly justify admissibility and emphasize the need to discuss and eventually decide on radioactive waste management issues regardless of diverging views on nuclear energy.

  17. Federal Register Notice

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic Plan| Department of.pdf6-OPAMDepartment6Awards »Facilities |Federal29853

  18. Coordination of Federal Transmission Permitting on Federal Lands...

    Office of Environmental Management (EM)

    transmission facilities on federal lands. In most instances, the Departments of Agriculture or Interior will be the Lead Agency, since they have jurisdiction over most of the...

  19. 31129Federal Register / Vol. 67, No. 90 / Thursday, May 9, 2002 / Rules and Regulations The Coast Guard certifies under 5

    E-Print Network [OSTI]

    US Army Corps of Engineers

    the Federal Government and Indian tribes. Energy Effects We have analyzed this proposed rule under Executive Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness governments and would either preempt State law or impose a substantial direct cost of compliance on them. We

  20. Advanced metering techniques in the federal sector

    SciTech Connect (OSTI)

    Szydlowski, R.F.; Chvala, W.D. Jr.; Halverson, M.A.

    1994-12-01T23:59:59.000Z

    The lack of utility metering in the federal sector has hampered introduction of direct billing of individual activities at most military installations. Direct billing will produce accountability for the amount of energy used and is a positive step toward self-directed energy conservation. For many installations, automatic meter reading (AMR) is a cost-effective way to increase the number of meters while reducing labor requirements and providing energy conservation analysis capabilities. The communications technology used by some of the AMR systems provides other demand-side management (DSM) capabilities. This paper summarizes the characteristics and relative merits of several AMR/DSM technologies that may be appropriate for the federal sector. A case study of an AMR system being installed at Fort Irwin, California, describes a cost-effective two-way radio communication system used for meter reading and load control.

  1. Multilateral, regional and bilateral energy trade governance

    SciTech Connect (OSTI)

    Leal-Arcas, Rafael; Grasso, Costantino; Rios, Juan Alemany (Queen Mary Univ. of London (United Kingdom))

    2014-12-01T23:59:59.000Z

    The current international energy trade governance system is fragmented and multi-layered. Streamlining it for greater legal cohesiveness and international political and economic cooperation would promote global energy security. The current article explores three levels of energy trade governance: multilateral, regional and bilateral. Most energy-rich countries are part of the multilateral trading system, which is institutionalized by the World Trade Organization (WTO). The article analyzes the multilateral energy trade governance system by focusing on the WTO and energy transportation issues. Regionally, the article focuses on five major regional agreements and their energy-related aspects and examines the various causes that explain the proliferation of regional trade agreements, their compatibility with WTO law, and then provides several examples of regional energy trade governance throughout the world. When it comes to bilateral energy trade governance, this article only addresses the European Union’s (EU) bilateral energy trade relations. The article explores ways in which gaps could be filled and overlaps eliminated whilst remaining true to the high-level normative framework, concentrating on those measures that would enhance EU energy security.

  2. Corporate Governance, the Environment, and the Internet

    E-Print Network [OSTI]

    Andrew, Jane

    2003-01-01T23:59:59.000Z

    contemporary society: Corporate governance at a crossroads.R. (1997). A survey of corporate governance. The Journal ofCorporate Governance, the Environment, and the Internet Jane

  3. Lesson from Fiascos in Russian Corporate Governance

    E-Print Network [OSTI]

    Fox, Merritt; Heller, Michael

    2000-01-01T23:59:59.000Z

    Cause Corporate Governance Failures . . . . . . . . . 1.understanding of how corporate governance works. See Heller,Shareholders in Corporate Governance (1999) (mimeo on file

  4. Lesson from Fiascos in Russian Corporate Governance

    E-Print Network [OSTI]

    Fox, Merritt B.; Heller, Michael A.

    1999-01-01T23:59:59.000Z

    Cause Corporate Governance Failures . . . . . . . . . 1.understanding of how corporate governance works. See Heller,Shareholders in Corporate Governance (1999) (mimeo on file

  5. Capital Structure Implications for Corporate Governance

    E-Print Network [OSTI]

    Rajan, Nishanth

    2012-01-01T23:59:59.000Z

    A. R¨oell, 2002, “Corporate governance and control,” ECGI-Enjoying the quiet life? Corporate governance and managerialGrinstein, 2007, “Corporate governance and firm value: The

  6. Appendix A: Handling of Federal

    Gasoline and Diesel Fuel Update (EIA)

    air conditioners to meet the standard. Federal Register Notice of Final Rulemaking. c. Water heaters Sets standards for water heaters in 2015. Require new purchases of water...

  7. National Federal Fleet Loaner Program, Interim Status Report

    SciTech Connect (OSTI)

    Francfort, James Edward

    2000-10-01T23:59:59.000Z

    The goal of the U.S. Department of Energy's (DOE) Loaner Program is to increase the awareness, deployment, and use of electric vehicles (EVs) in Federal fleets. The Loaner Program accomplishes this by providing free EVs to Federal fleets on a loaner basis, generally for 1 or 2 months. The Program partners DOE with six electric utilities, with DOE providing financial support and some leads on Federal fleets interested in obtaining EVs. The utilities obtain the vehicles, identify candidate loaner fleets, loan the vehicles, provide temporary charging infrastructure, provide overall support to participating Federal fleets, and support fleets with their leasing decisions. While the utilities have not had the success initially envisioned by themselves, DOE, the Edison Electric Institute, and the Electric Vehicle Association of the Americas, the utilities can not be faulted for their efforts, as they are not the entity that makes the ultimate lease or no-lease decision. Some external groups have suggested to DOE that they direct other federal agencies to change their processes to make loaning vehicles easier; this is simply not within the power of DOE. By law, a certain percentage of all new vehicle acquisitions are supposed to be alternative fuel vehicles (AFV); however, with no enforcement, the federal agencies are not compelled to lease AFVs such as electric vehicles.

  8. Guidebook to excellence, 1994: A directory of federal resources for mathematics and science education improvement

    SciTech Connect (OSTI)

    Not Available

    1994-04-01T23:59:59.000Z

    The purpose of this Guidebook to Excellence is to assist educators, parents, and students across the country in attaining the National Education Goals, particularly Goal 4: By the year 2000, US students will be first in the world in science and mathematics achievement. The Guidebook will help make the education community aware of the Federal Government`s extensive commitment to mathematics and science education. Sixteen Federal agencies collaborated with the Eisenhower National Clearinghouse to produce this publication. Although the Guidebook contains valuable information for anyone involved in mathematics and science education, its focus is on the elementary and secondary levels.

  9. Barriers to the increased utilization of coal combustion/desulfurization by-products by government and commercial sectors - Update 1998

    SciTech Connect (OSTI)

    Pflughoeft-Hassett, D.F.; Sondreal, E.A.; Steadman, E.N.; Eylands, K.E.; Dockter, B.A.

    1999-07-01T23:59:59.000Z

    The following conclusions are drawn from the information presented in this report: (1) Joint efforts by industry and government focused on meeting RTC recommendations for reduction/removal of barriers have met with some success. The most notable of these are the changes in regulations related to CCB utilization by individual states. Regionally or nationally consistent state regulation of CCB utilization would further reduce regulatory barriers. (2) Technology changes will continue to be driven by the CAAA, and emission control technologies are expected to continue to impact the type and properties of CCBs generated. As a result, continued RD and D will be needed to learn how to utilize new and changing CCBs in environmentally safe, technically sound, and economically advantageous ways. Clean coal technology CCBs offer a new challenge because of the high volumes expected to be generated and the different characteristics of these CCBs compared to those of conventional CCBs. (3) Industry and government have developed the RD and D infrastructure to address the technical aspects of developing and testing new CCB utilization applications, but this work as well as constant quality control/quality assurance testing needs to be continued to address both industry wide issues and issues related to specific materials, regions, or users. (4) Concerns raised by environmental groups and the public will continue to provide environmental and technical challenges to the CCB industry. It is anticipated that the use of CCBs in mining applications, agriculture, structural fills, and other land applications will continue to be controversial and will require case-by-case technical and environmental information to be developed. The best use of this information will be in the development of generic regulations specifically addressing the use of CCBs in these different types of CCB applications. (5) The development of federal procurement guidelines under Executive Order 12873 titled ''Federal Acquisition, Recycling and Waste Prevention,'' in October 1993 was a positive step toward getting CCBs accepted in the marketplace. Industry needs to continue to work with EPA to develop additional procurement guidelines for products containing CCBs--and to take advantage of existing guidelines to encourage the use of CCBs in high-profile projects. (6) Accelerated progress toward increased utilization of CCBs can be made only if there is an increased financial commitment and technical effort by industry and government. The framework for this has been set by the successful cooperation of industry and government under DOE leadership. Cooperation should continue, with DOE fulfilling its lead role established in the RTC. It is clear that the RTC recommendations continue to have validity with respect to increasing CCB utilization and continue to provide guidance to industry and government agencies.

  10. Federal Communications Commission FCC 02-48 Federal Communications Commission

    E-Print Network [OSTI]

    Federal Communications Commission FCC 02-48 Before the Federal Communications Commission Washington Communications Commission FCC 02-48 2 F. Cumulative Impact, D.C. 20554 In the matter of Revision of Part 15 of the Commission's Rules Regarding Ultra

  11. EPA`s local governments reimbursement program

    SciTech Connect (OSTI)

    Zeller, E.; Ferguson, J. [Environmental Protection Agency, Washington, DC (United States). Emergency Response Division; Catalano, J.; Lally, R. [Booz Allen and Hamilton, Bethesda, MD (United States)

    1994-12-31T23:59:59.000Z

    Under the Superfund Amendments and Reauthorization Act (SARA), section 123 of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), Congress enacted the Local Governments Reimbursement (LGR) Program. The program`s goal is to provide financial relief to local governments that conduct emergency measures in response to releases or threats of releases of hazardous substances, pollutants, or contaminants. The intent of this program is to supply reimbursements of up to $25,000 per incident to the most deserving applicants, specifically local governments, for responses that exceed funds normally available for temporary emergency measures. These monies provide greatly needed support when potentially responsible party (PRP) searches and other cost recovery efforts fail. The standards and the approach for this program are set forth in 40 CFR Part 310, and are consistent with the overall policies and goals of the Superfund program. The maximum amount allocated to the reimbursement program is equal to 0.1 percent of the total amount appropriated for the Superfund, or approximately $1.7 million per year. A major focus of this program is to make known the availability of these funds for reimbursement to local governments in need of financial assistance. This paper highlights the features of this program, illustrates the types of incidents that have been awarded reimbursement, and describes common mistakes to be avoided when applying for reimbursement.

  12. EPA`s Local Governments Reimbursement Program

    SciTech Connect (OSTI)

    Zeller, E.; Ferguson, J. [Environmental Protection Agency, Washington, DC (United States). Emergency Response Division; Catalano, J.; Lally, R. [Booz Allen and Hamilton, McLean, VA (United States)

    1995-12-31T23:59:59.000Z

    Under the Superfund Amendments and Reauthorization Act (SARA), section 123 of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), Congress enacted the Local Governments Reimbursement (LGR) Program. The program`s goal is to provide financial relief to local governments that conduct emergency measures in response to releases or threats of releases of hazardous substances, pollutants, or contaminants. The intent of this program is to supply reimbursements of up to $25,000 per incident to the most deserving applicants, specifically local governments, for responses that exceed funds normally available for temporary emergency measures. These monies provide greatly needed support when potentially responsible party (PRP) searches and other cost-recovery efforts fail. The standards and the approach for this program are set forth in 40 CFR Part 310, and are consistent with the overall policies and goals of the Superfund program. The maximum amount allocated to the reimbursement program is equal to 0.1 percent of the total amount appropriated for the Superfund, or approximately $1.7 million per year. A major focus of this program is to make known the availability of these funds for reimbursement to local governments in need of financial assistance. This paper highlights the features of this program, illustrates the types of incidents that have been awarded reimbursement, and describes common mistakes to be avoided when applying for reimbursement.

  13. 1998 federal energy and water management award winners

    SciTech Connect (OSTI)

    NONE

    1998-10-28T23:59:59.000Z

    Energy is a luxury that no one can afford to waste, and many Federal Government agencies are becoming increasingly aware of the importance of using energy wisely. Thoughtful use of energy resources is important, not only to meet agency goals, but because energy efficiency helps improve air quality. Sound facility management offers huge savings that affect the agency`s bottom line, the environment, and workplace quality. In these fiscally-modest times, pursuing sound energy management programs can present additional challenges for energy and facility managers. The correct path to take is not always the easiest. Hard work, innovation, and vision are characteristic of those who pursue energy efficiency. That is why the Department of energy, Federal Energy Management Program (FEMP) is proud to salute the winners of the 1998 Federal Energy and Water Management Award. The 1998 winners represent the kind of 21st century thinking that will help achieve widespread Federal energy efficiency. In one year, the winners, through a combination of public and private partnerships, saved more than $222 million and 10.5 trillion Btu by actively identifying and implementing energy efficiency, water conservation, and renewable energy projects. Through their dedication, hard work, ingenuity, and success, the award winners have also inspired others to increase their own efforts to save energy and water and to more aggressively pursue the use of renewable energy sources. The Federal Energy and Water Management Awards recognize the winners` contributions and ability to inspire others to take action.

  14. PSE&G- Government Facility Efficiency Program (New Jersey)

    Broader source: Energy.gov [DOE]

    The PSE&G Municipal Direct Install Program provides recommended efficiency upgrades up front with a program budget of $50 million to government and non-profit facilities including schools with...

  15. MINIMUM SECURITY REQUIREMENTS FOR FEDERAL

    E-Print Network [OSTI]

    March 2006 MINIMUM SECURITY REQUIREMENTS FOR FEDERAL INFORMATION AND INFORMATION SYSTEMS: FEDERAL INFORMATION PROCESSING STANDARD (FIPS) 200 APPROVED BY THE SECRETARY OF COMMERCE MINIMUM SECURITY REQUIREMENTS BY THE SECRETARY OF COMMERCE Shirley Radack, EditorShirley Radack, Editor Computer Security Division

  16. Local Government Revenue Bonds (Montana)

    Broader source: Energy.gov [DOE]

    Limited obligation local government bonds ("special revenue bonds") may be issued for qualified electric energy generation facilities, including those powered by renewables. These bonds generally...

  17. Government Personal Property Asset Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-05-11T23:59:59.000Z

    Establishes procedures for managing Government personal property owned or leased by and in the custody of Department of Energy (DOE) Headquarters employees. Cancels HQ 1400.1.

  18. Governance & Policies Effective: October 1997

    E-Print Network [OSTI]

    Hardy, Christopher R.

    Governance & Policies Effective: October 1997 Academic Policy: Undergraduate Studies ACADEMIC AMNESTY Approved: October 1997 Revised: May 16, 2007, Deans' Council March 20, 2007, Faculty Senate Former

  19. Governance & Policies Effective: October 1997

    E-Print Network [OSTI]

    Hardy, Christopher R.

    Governance & Policies Effective: October 1997 Academic Policy: Undergraduate Studies LEAVE of ABSENCE Approved: October 1997 Reviewed: June 4, 2007 Deans' Council, Faculty Senate Students who wish

  20. Governance & Policies Effective: October 1997

    E-Print Network [OSTI]

    Hardy, Christopher R.

    Governance & Policies Effective: October 1997 Academic Policy INDEPENDENT STUDY Approved: October 1997 Reviewed: June 1, 2007 Deans' Council, Faculty Senate Independent study allows the student

  1. Governance & Policies Effective: October 1997

    E-Print Network [OSTI]

    Hardy, Christopher R.

    Governance & Policies Effective: October 1997 Academic Policy STUDY at OTHER INSTITUTIONS Approved: October 1997 Revised: Spring 2000 Reviewed: June 1, 2007 Deans' Council, Faculty Senate Undergraduate

  2. Governance & Policies Effective: October 1997

    E-Print Network [OSTI]

    Hardy, Christopher R.

    Governance & Policies Effective: October 1997 Academic Policy: Graduate Studies GRADUATE ASSISTANTSHIPS Approved: October 1997 Revised: May 24, 2007 Deans' Council Graduate assistantships are awarded

  3. Transition Strategies: Government Options and Market Penetration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategies: Government Options and Market Penetration Scenarios Transition Strategies: Government Options and Market Penetration Scenarios Presentation on Transition Strategies:...

  4. An Integrated Approach to Nanotechnology Governance

    E-Print Network [OSTI]

    Paddock, LeRoy

    2010-01-01T23:59:59.000Z

    An Integrated Approach to Nanotechnology Governance LeRoyLegal and Social Issues . NANOTECHNOLOGY1. A National Nanotechnology Governance D

  5. National Center for Digital Government National Center for Digital Government

    E-Print Network [OSTI]

    Schweik, Charles M.

    -545-1108 www.umass.edu/digitalcenter September 28, 2007 NCDG Hosts Officials from Kazakhstan The National Kazakhstan on Wednesday, September 26, 2007. Amherst, MA­ The National Center for Digital Government (NCDG) welcomed a delegation of business and government leaders from the Republic of Kazakhstan on Wednesday

  6. 2013 Federal Energy and Water Management Award Winners | Department...

    Energy Savers [EERE]

    3 Federal Energy and Water Management Award Winners 2013 Federal Energy and Water Management Award Winners 2013 Federal Energy and Water Management Award Winners The Federal Energy...

  7. Federal Utility Program Overview (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-07-01T23:59:59.000Z

    Fact sheet overview of the U.S. Department of Energy (DOE) Federal Energy Management Program's (FEMP) Federal Utility Program, including common contracts and services available to Federal agencies through local serving utilities.

  8. Reliability and the Federal Energy Regulatory Commission

    Broader source: Energy.gov [DOE]

    Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—covers the Federal Energy Regulatory Commission (FERC) strategic plan, the Federal Power Act (FPA), current energy security posture, and more.

  9. Analysis of environmental regulations governing the disposal of geothermal wastes in California

    SciTech Connect (OSTI)

    Royce, B.A.

    1985-09-01T23:59:59.000Z

    Federal and California regulations governing the disposal of sludges and liquid wastes associated with the production of electricity from geothermal resources were evaluated. Current disposal practices, near/far term disposal requirements, and the potential for alternate disposal methods or beneficial uses for these materials were determined. 36 refs., 3 figs., 15 tabs. (ACR)

  10. University of Toronto Governing Council

    E-Print Network [OSTI]

    Boonstra, Rudy

    fiVO AR BO R VELUT University of Toronto Governing Council W eb C opy UNIVERSITY FUNDS INVESTMENT://www.governingcouncil.utoronto.ca/ #12;UNIVERSITY FUNDS INVESTMENT POLICY June 21, 2007 Table of Contents 1. DESCRIPTION OF UNIVERSITY.....................................................................................................6 W eb C opy University of Toronto Governing Council--Web version 2 #12;UNIVERSITY FUNDS INVESTMENT

  11. 3. PROJECT GOVERNANCE 1. Introduction

    E-Print Network [OSTI]

    3. PROJECT GOVERNANCE 1. Introduction In October 2010, the CEI UPF-Icària project, led by Pompeu Fabra University (UPF), was named an International Campus of Excellence (CEI). The project defined a set I. CEI UPF-Icària governance model Source: CEI UPF-Icària project The specific purpose of each unit

  12. Screening of CHP Potential at Federal Sites in Select Regions of the U.S.

    SciTech Connect (OSTI)

    Energy Nexus Group, . .

    2002-02-25T23:59:59.000Z

    Combined Cooling Heat and Power (CHP) is a master term for onsite power generation technologies that sequentially produce electrical or mechanical energy and useful thermal energy. Some form of CHP has existed for more than 100 years and it is now achieving a greater level of acceptance due to an increasing need for reliable power service and energy cost management. Capturing and using the heat produced as a byproduct of generating electricity from fuel sources increases the usable energy that can be obtained from the original fuel source. CHP technologies have the potential to reduce energy consumption through increased efficiency--decreasing energy bills as well as pollution. The EPA recognizes CHP as a potent climate change mitigation measure. The U.S. Department of Energy (D.O.E.) Federal Energy Management Program (FEMP) is assisting Federal agencies to realize their energy efficiency goals. CHP is an efficiency measure that is receiving growing attention because of its sizable potential to provide efficiency, environmental, and reliability benefits. CHP therefore benefits the host facility, the electric infrastructure, and the U.S. society as a whole. This report and study seeks to make a preliminary inquiry into near term CHP opportunities for federal facilities in selected U.S. regions. It offers to help focus the attention of policy makers and energy facility managers on good candidate facilities for CHP. First, a ranked list of high potential individual sites is identified. Then, several classes of federal facilities are identified for the multiple opportunities they offer as a class. Recommendations are then offered for appropriate next steps for the evaluation and cost effective implementation of CHP. This study was designed to ultimately rank federal facilities in terms of their potential to take advantage of CHP economic and external savings in the near term. In order to best serve the purposes of this study, projections have been expressed in terms of sizing CHP to thermal and electrical estimates. The table below is a summary of findings of CHP potential for those federal facilities that chose to participate in the screening process. The study focused on three U.S. regions: California, Texas, and New York/New England. All federal facilities in these three regions with reported building space greater than 100,000 square feet were initial targets to contact and offer CHP screening services. Ranking criteria were developed to screen sites for near term CHP potential. The potential site list was pared down for a variety of reasons including site- specific and agency wide decisions not to participate, desk audit assessments, and untraceable contact information. The results are based upon the voluntary participation of those sites we were able to contact, so they reflect a fraction of the total potential CHP opportunities at federal government facilities.

  13. The Federal Budget Process - Lessons That Can Be Learned

    ScienceCinema (OSTI)

    Stephen Goldberg

    2010-01-08T23:59:59.000Z

    The talk will provide up-to-date information on the Federal budget process and present three informative case studies regarding the intersection of budget decisions with important National policy decisions. In conclusion, the lecture will provide a preview of topics that may be interest for future study.

  14. The Federal Budget Process - Lessons That Can Be Learned

    SciTech Connect (OSTI)

    Goldberg, Stephen (ANL) [ANL

    2008-01-30T23:59:59.000Z

    The talk will provide up-to-date information on the Federal budget process and present three informative case studies regarding the intersection of budget decisions with important National policy decisions. In conclusion, the lecture will provide a preview of topics that may be interest for future study.

  15. Federal Energy Efficiency through Utility Partnerships

    SciTech Connect (OSTI)

    Not Available

    2007-08-01T23:59:59.000Z

    Two-page fact sheet on FEMP's Federal Utility Program that works with federal agencies and their utilities to reduce energy use.

  16. Federal Utility Partnership Working Group Participants

    Broader source: Energy.gov [DOE]

    The following Federal agencies have participated in the Federal Utility Partnership Working Group or engaged in a utility energy service contract project.

  17. Federal Fleet Program Overview (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-06-01T23:59:59.000Z

    Fact sheet overview of FEMP services and assistance available to Federal fleet managers to implement alternative fuel and advanced vehicle strategies in compliance with Federal goals and requirements.

  18. Federal / State Legislative & Regulatory Changes Required for...

    Energy Savers [EERE]

    Issues Federal and State Blending Restrictions Action by ASTM NCWM to address higher ethanol blends Federal State Legislative & Regulatory Changes Required for Introduction of...

  19. Federal Energy Management Program (FEMP) Technical Assistance...

    Energy Savers [EERE]

    Federal Energy Management Program (FEMP) Technical Assistance Request Portal User Guide Federal Energy Management Program (FEMP) Technical Assistance Request Portal User Guide...

  20. Federal Sector Renewable Energy Project Implementation: ""What...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Presentation by...

  1. Funding Mechanisms for Federal Geothermal Permitting (Presentation)

    SciTech Connect (OSTI)

    Witherbee, K.

    2014-03-01T23:59:59.000Z

    This presentation is about the GRC paper, which discusses federal agency revenues received for geothermal projects and potential federal agency budget sources for processing geothermal applications.

  2. Information Security: Coordination of Federal Cyber Security...

    Office of Environmental Management (EM)

    Security: Coordination of Federal Cyber Security Research and Development Information Security: Coordination of Federal Cyber Security Research and Development GAO recommends that...

  3. Federal Radiological Monitoring and Assessment Center | National...

    National Nuclear Security Administration (NNSA)

    Mission The mission of the FRMAC is to coordinate and manage all federal radiological environmental monitoring and assessment Federal Radiological Monitoring and Assessment...

  4. Federal Utility Partnership Working Group Utility Partners

    Broader source: Energy.gov [DOE]

    Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

  5. Federal Utility Partnership Working Group Meeting Chairman's...

    Office of Environmental Management (EM)

    Meeting Chairman's Corner Federal Utility Partnership Working Group Meeting Chairman's Corner Presentation-given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG)...

  6. Federal Utility Partnership Working Group Meeting: Washington...

    Broader source: Energy.gov (indexed) [DOE]

    Federal Utility Partnership Working Group Meeting: Washington Update fupwgspring12unruh.pdf More Documents & Publications Federal Utility Partnership Working Group Meeting:...

  7. Federal Utility Partnership Working Group Meeting: Washington...

    Energy Savers [EERE]

    Federal Utility Partnership Working Group Meeting: Washington Update Federal Utility Partnership Working Group Meeting: Washington Update Presentation-given at the Fall 2012...

  8. FEDIX: The on-line database retrieval service of government information for colleges, universities, and other organizations. User`s guide: Version 4.0/Release 2.0

    SciTech Connect (OSTI)

    Not Available

    1992-05-01T23:59:59.000Z

    FEDIX is an on-line information service that links the higher education community and the federal government to facilitate research, education, and services. The system provides accurate and timely federal agency information to colleges, universities, and other research organizations. There are no registration fees and no access charges for using FEDIX. Agencies participating in the FEDIX system include: Department of Energy (DOE), Federal Aviation Administration (FAA), National Aeronautics and Space Administration (NASA), Office of Naval Research (ONR), Air Force Office of Scientific Research (AFOSR), National Science Foundation (NSF), National Security Agency (NSA), Department of Commerce (DOC), Department of Education (DOEd), Department of Housing and Urban Development (HUD), and Agency for International Development (AID). Additional government agencies are expected to join FEDIX in the near future. This guide is intended to help users access and utilize the FEDIX system. Because the system is frequently updated, however, some menus and tables used as examples in this text may not exactly match those displayed on the live system.

  9. Matching Federal Government EnergyMatching Federal Government Energy Needs with Energy Efficient Fuel CellsNeeds with Energy Efficient Fuel Cells

    E-Print Network [OSTI]

    Stationary / Distributed Power Backup Power Remote Power Premium Power Residential / Commercial & Industrial Power Backup Power Remote Power Premium Power Residential / Commercial & Industrial Power MARKETS & APPLICATIONS · Prime Movers · 7x24 · CHP · Grid Connect and/or Grid Independent · Natural Gas · Propane

  10. Review of activities and plans for solar energy in Federal buildings

    SciTech Connect (OSTI)

    Not Available

    1980-10-01T23:59:59.000Z

    The purpose of this report is to provide the Department of Energy's Solar Federal Buildings Program with data on the Federal agencies' activities and plans regarding the use of solar energy in their buildings, and consequently, to make recommendations concerning the Solar Federal Buildings Program's plans. Specifically this report encompasses an analysis of agencies Ten Year Buildings construction, leasing and retrofit plans to provide visibility for and detailed knowledge of Federal agencies planning regarding solar and other renewable energy resources. The results of the analysis conducted, pertinent statistical information regarding planned solar projects, and recommendations concerning the SFBP plans are presented.

  11. U.S. Federal Investments in Energy R&D: 1961-2008

    SciTech Connect (OSTI)

    Dooley, James J.

    2008-10-10T23:59:59.000Z

    This paper documents nearly a half century of U.S. federal government support for energy research and development (R&D). Data on energy R&D expenditures disaggregated by major program area are presented here for the first time for the period 1961-2008. This paper also documents U.S. federal government spending on key large scale energy R&D programs that were initiated in response to the oil crisis of the 1970s. Since 1961, the U.S. government has invested nearly $172 billion (in inflation adjusted 2005 US dollars) for the development of advanced energy technologies and for the necessary underlying basic science. Over this period, nearly 24% of the total federal investment in energy R&D occurred during the short seven-year span of 1974-1980. From 1977-1981, energy R&D investments briefly rose above 10% of all federal R&D; however, since the mid-1990s energy R&D has accounted for only about 1% of all federal R&D investments.

  12. In the blind spot: the federal government’s intervention in the housing crisis in suburban California

    E-Print Network [OSTI]

    Lefebvre, Hugo

    2015-01-01T23:59:59.000Z

    January 2007 and June 2008 a grantee must receive a minimumto more effec- tively monitor grantees to ensure propercriteria: 24 Eligible Grantees are as follows: ? principal

  13. Federal Agency Hazardous Waste Compliance Docket (docket). Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-01-01T23:59:59.000Z

    The Federal Facilities Hazardous Waste Compliance Docket (``docket``) identifies Federal facilities that may be contaminated with hazardous substances and that must be evaluated to determine if they pose a risk to public health or the environment The docket, required by Section 120(c) of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), also provides a vehicle for making information about potentially contaminated facilities available to the public. Facilities listed on the docket must complete site assessments that provide the Environmental Protection Agency (EPA) with information needed to determine whether or not the facility should be included on he National Priorities List (NPL). This Information Brief, which revises the previous Federal Agency Hazardous Waste Compiliance Docket Information Brief, provides updated information on the docket listing process, the implications of listing, and facility status after listing.

  14. Export Control in a Nutshell Avoiding Severe Federal Penalties Short Briefing for Academic and Staff Personnel

    E-Print Network [OSTI]

    Derisi, Joseph

    Export Control in a Nutshell ­ Avoiding Severe Federal Penalties Short Briefing for Academic of the U.S. without first conferring with your campus export office to determine if a license is required. Export regulations govern any transfer of physical objects (be it equipment, compounds, materials

  15. Federal offshore oil and gas lease bonus bid rejection policy: Past and present

    SciTech Connect (OSTI)

    Lohrenz, J.; Dougherty, E.L.

    1983-11-01T23:59:59.000Z

    Policy concerning rejection of bids for U.S. government federal offshore oil and gas leases offered to the market recently has been changed. Technical analyses presaging this change are given here. An initial technical assessment of the new policy compared with the old is presented.

  16. Federal Substance Abuse Testing Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-01-30T23:59:59.000Z

    The Order establishes the requirements and responsibilities for the DOE Federal Substance Abuse Testing Program which covers drug and alcohol testing. Cancels DOE O 3792.3 Chg 1.

  17. Bureaucratic Reform and E-Government in the United States: An Institutional Perspective

    E-Print Network [OSTI]

    Schweik, Charles M.

    Bureaucratic Reform and E-Government in the United States: An Institutional Perspective Jane E. #12;Bureaucratic Reform and E-Government in the United States: An Institutional Perspective Jane E perspective on e-government can provide important insights into bureaucratic reform, political development

  18. Polymer matrix composites research: A survey of federally sponsored programs

    SciTech Connect (OSTI)

    Not Available

    1990-06-01T23:59:59.000Z

    This report identifies research conducted by agencies of the federal government other than the Department of Energy (DOE) in the area of advanced polymer matrix composites (PMCs). DOE commissioned the report to avoid duplicating other agencies' efforts in planning its own research program for PMCs. PMC materials consist of high-strength, short or continuous fibers fused together by an organic matrix. Compared to traditional structural metals, PMCs provide greater strength and stiffness, reduced weight and increased heat resistance. The key contributors to PMC research identified by the survey are the Department of Defense (DOD), the National Aeronautics and Space Administration (NASA), the National Science Foundation (NSF), and the Department of Transportation (DOT). The survey identified a total of 778 projects. More than half of the total projects identified emphasize materials research with a goal toward developing materials with improved performance. Although an almost equal number of identified materials projects focus on thermosets and thermoplastics receive more attention because of their increased impact resistance and their easy formability and re-formability. Slightly more than one third of projects identified target structures research. Only 15 percent of the projects identified focus on manufacturing techniques, despite the need for efficient, economical methods manufacturing products constructed of PMCs--techniques required for PMCs to gain widespread acceptance. Three issues to be addressed concerning PMCs research are economy of use, improvements in processing, and education and training. Five target technologies have been identified that could benefit greatly from increased use of PMCs: aircraft fuselages, automobile frames, high-speed machinery, electronic packaging, and construction.

  19. Federal Technical Capability Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-05-18T23:59:59.000Z

    Provides requirements and responsibilities to ensure recruitment and hiring of technically capable personnel to retain critical technical capabilities within the Department at all times. Cancels DOE M 426.1-1. Canceled by DOE O 426.1.

  20. Federally-Recognized Tribes of the Columbia-Snake Basin.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration

    1997-11-01T23:59:59.000Z

    This is an omnibus publication about the federally-recognized Indian tribes of the Columbia-Snake river basin, as presented by themselves. It showcases several figurative and literal snapshots of each tribe, bits and pieces of each tribe`s story. Each individual tribe or tribal confederation either submitted its own section to this publication, or developed its own section with the assistance of the writer-editor. A federally-recognized tribe is an individual Indian group, or confederation of Indian groups, officially acknowledged by the US government for purposes of legislation, consultation and benefits. This publication is designed to be used both as a resource and as an introduction to the tribes. Taken together, the sections present a rich picture of regional indian culture and history, as told by the tribes.

  1. Corporate governance and insider trading

    E-Print Network [OSTI]

    Rozanov, Konstantin A

    2008-01-01T23:59:59.000Z

    I investigate the relation between corporate governance and insider trading by corporate executives. Despite the general view that trade on non-public information adversely affects capital market participants, the impact ...

  2. Governance & Policies Effective: October 1997

    E-Print Network [OSTI]

    Hardy, Christopher R.

    Governance & Policies Effective: October 1997 Faculty Senate COMMITTEE on COOPERATIVE EDUCATION/INTERNSHIP PROGRAMS Approved: as of 1997 review Faculty Senate Membership 1. The co-op coordinators from each

  3. Projected Benefits of Federal Energy Efficiency and

    E-Print Network [OSTI]

    Laboratory (PNNL) o Federal Energy Management: Donna Hostick (PNNL) o Hydrogen and Fuel Cells: Fred Joseck

  4. Metering and the New Federal Requirements of Energy Policy Act 2005

    E-Print Network [OSTI]

    Ream, A.; Verdict, M.

    2006-01-01T23:59:59.000Z

    agencies to meter electricity use in all federal buildings by Oct. 1, 2012 using advanced meters or metering devices that provide data at least daily. Six months after the enactment of EPAct, DOE’s Federal Energy Management Program, or FEMP... Station, Texas ABSTRACT Section 103 of the Energy Policy Act of 2005 (EPAct 2005) (1) mandates the installation of meters and advanced electric meters on all Federal Buildings by 2012 using guidelines developed by the US Department of Energy...

  5. Developing Government Renewable Energy Projects

    SciTech Connect (OSTI)

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01T23:59:59.000Z

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  6. Limited Personal Use of Government Office Equipment including Information Technology

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-07T23:59:59.000Z

    The Order establishes requirements and assigns responsibilities for employees' limited personal use of Government resources (office equipment and other resources including information technology) within DOE, including NNSA. The Order is required to provide guidance on appropriate and inappropriate uses of Government resources. This Order was certified 04/23/2009 as accurate and continues to be relevant and appropriate for use by the Department. Certified 4-23-09. No cancellation.

  7. RECOMMENDATIONS FOR ESTABLISHING AN IDENTITY ECOSYSTEM GOVERNANCE

    E-Print Network [OSTI]

    Perkins, Richard A.

    RECOMMENDATIONS FOR ESTABLISHING AN IDENTITY ECOSYSTEM GOVERNANCE STRUCTURE THE DEPARTMENT an Identity Ecosystem Governance Structure This page is intentionally left blank. #12;Recommendations for Establishing an Identity Ecosystem Governance Structure Foreword The Internet is one of the most

  8. Fiscal stimulus through state and local governments

    E-Print Network [OSTI]

    Feiveson, Laura (Laura Judith)

    2012-01-01T23:59:59.000Z

    State and local governments in the United States make up more than half of total government consumption and investment and almost 90 percent of total government employment. Despite these facts, the debates surrounding ...

  9. Providence Newberg Medical Center

    High Performance Buildings Database

    Newberg, OR In 2002, Providence Health & Services began planning a new 188,000 square foot medical center in Newberg, Oregon to respond to the growing community's need for accessible health care. Since this was Providence's first new hospital in almost thirty years, its leaders decided to approach the project through innovative planning, design, and construction, including the achievement of lifecycle energy savings and a potential LEED certification. The hospital is comprised of 40 inpatient beds with views out to the surrounding rural landscape or into lushly planted internal courtyards.

  10. Content Provider Speeds Application

    E-Print Network [OSTI]

    Fisher, Kathleen

    protocols like SMPP for SMS and MM7 for MMS are industry standards, carriers typically layer their own APIs.0 standards," says Rose, "and we thought that would help speed development." The AT&T API Platform includesContent Provider Speeds Application Development AT&T API Platform cuts development time and costs

  11. Federal Information Security Management Act: Fiscal Year 2014 Evaluation (IG-15-004, November 13, 2014)

    E-Print Network [OSTI]

    Waliser, Duane E.

    Federal Information Security Management Act: Fiscal Year 2014 Evaluation (IG-15-004, November 13) identified for this year's Federal Information Security Management Act (FISMA) review; however, the Agency Administrator, provides the Office of Inspector General's (OIG) independent assessment of NASA's information

  12. Implementation of the National Incident Management System (NIMS)/Incident Command System (ICS) in the Federal Radiological Monitoring and Assessment Center(FRMAC) - Emergency Phase

    SciTech Connect (OSTI)

    NSTec Environmental Restoration

    2007-04-01T23:59:59.000Z

    Homeland Security Presidential Directive HSPD-5 requires all federal departments and agencies to adopt a National Incident Management System (NIMS)/Incident Command System (ICS) and use it in their individual domestic incident management and emergency prevention, preparedness, response, recovery, and mitigation programs and activities, as well as in support of those actions taken to assist state and local entities. This system provides a consistent nationwide template to enable federal, state, local, and tribal governments, private-sector, and nongovernmental organizations to work together effectively and efficiently to prepare for, prevent, respond to, and recover from domestic incidents, regardless of cause, size, or complexity, including acts of catastrophic terrorism. This document identifies the operational concepts of the Federal Radiological Monitoring and Assessment Center's (FRMAC) implementation of the NIMS/ICS response structure under the National Response Plan (NRP). The construct identified here defines the basic response template to be tailored to the incident-specific response requirements. FRMAC's mission to facilitate interagency environmental data management, monitoring, sampling, analysis, and assessment and link this information to the planning and decision staff clearly places the FRMAC in the Planning Section. FRMAC is not a mitigating resource for radiological contamination but is present to conduct radiological impact assessment for public dose avoidance. Field monitoring is a fact-finding mission to support this effort directly. Decisions based on the assessed data will drive public protection and operational requirements. This organizational structure under NIMS is focused by the mission responsibilities and interface requirements following the premise to provide emergency responders with a flexible yet standardized structure for incident response activities. The coordination responsibilities outlined in the NRP are based on the NIMS/ICS construct and Unified Command (UC) for management of a domestic incident. The NRP Nuclear/Radiological Incident Annex (NUC) further provides requirements and protocols for coordinating federal government capabilities to respond to nuclear/radiological Incidents of National Significance (INS) and other radiological incidents. When a FRMAC is established, it operates under the parameters of NIMS as defined in the NRP. FRMAC and its operations have been modified to reflect NIMS/ICS concepts and principles and to facilitate working in a Unified Command structure. FRMAC is established at or near the scene of the incident to coordinate radiological monitoring and assessment and is established in coordination with the U.S. Department of Homeland Security (DHS); the coordinating agency; other federal agencies; and state, local, and tribal authorities. However, regardless of the coordinating agency designation, U.S. Department of Energy (DOE) coordinates radiological monitoring and assessment activities for the initial phases of the offsite federal incident response through the Radiological Assistance Program (RAP) and FRMAC assets. Monitoring and assessment data are managed by FRMAC in an accountable, secure, and retrievable format. Monitoring data interpretations, including exposure rate contours, dose projections, and any requested radiological assessments are to be provided to the DHS; to the coordinating agency; and to state, local, and tribal government agencies.

  13. Measurement and verifiction (M&V) guidelines for federal energy projects

    SciTech Connect (OSTI)

    NONE

    1996-02-01T23:59:59.000Z

    This document provides procedures and guidelines for quantifying the savings resulting from the installation of Energy Conservation Measures (ECMs) implemented with federal Energy Savings Performance Contracts (ESPCs) or task orders implemented under a federal IDIQ contract. The first section of this document provides an overview of measurement and verification (M&V) options and procedures. The second, third, and fourth sections provide standardized measurement and verification (M&V) methods for common types of ECMs.

  14. Federal Research Update Webinar Wednesday October 31 Friday November 2

    E-Print Network [OSTI]

    Maryland, Baltimore County, University of

    for Teaching and Learning, National Center for Education Research, Department of Education, on updates of EDFederal Research Update Webinar Wednesday October 31 ­ Friday November 2 Hosted by The Office will be provided. #12;Federal Research Update Webinar Monday October 29 ­ Friday November 2 Wednesday, October 31

  15. Worker Protection Management for DOE Federal and Contractor Employees

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-30T23:59:59.000Z

    Establishes the framework for an effective worker protection program that will reduce or prevent accidental losses, injuries, and illnesses by providing DOE Federal and contractor workers with a safe and healthful workplace. Chg 1, 10-26-95; Chg 2, 10-26-96.

  16. Drug-Free Federal Workplace Testing Implementation Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-12-06T23:59:59.000Z

    The subject directive provides requirements and responsibilities for the implementation of a workplace program to test for the use of illegal drugs to facilitate the maintenance of a drug-free Federal workplace. In the course of the revision, the document number will change from DOE O 3792.3 to DOE O 343.1.

  17. Energy Exchange: Federal Sustainability for the Next Decade

    Broader source: Energy.gov [DOE]

    The 2015 Energy Exchange in Phoenix, Arizona, is being launched to provide two-and-a-half days of structured training to employees from federal agencies, both civilian and military, who are working to improve facility performance, advance the use of renewable energy, and reduce greenhouse gas emissions.

  18. Assessment of government tribology programs

    SciTech Connect (OSTI)

    Peterson, M.B.; Levinson, T.M.

    1985-09-01T23:59:59.000Z

    An assessment has been made to determine current tribology research and development work sponsored or conducted by the government. Data base surveys and discussions were conducted to isolate current projects sponsored primarily by 21 different government organizations. These projects were classified by subject, objective, energy relevance, type of research, phenomenon being investigated, variables being studied, type of motion, materials and application. An abstract of each project was prepared which included the classification, sponsor, performing organization and a project description. It was found that current work is primarily materials oriented to meet military requirements. Other than the high temperature programs very few of the tribology projects accomplish energy related objectives.

  19. Are state renewable feed-in tariff initiatives truly throttled by Federal statutes after the FERC California decision?

    SciTech Connect (OSTI)

    Yaffe, David P.

    2010-10-15T23:59:59.000Z

    For the last few years, several local and state governments have adopted ''feed-in tariffs'' to promote development of dispersed, small-scale renewable generation through incentive pricing. Most FITs are intended to stimulate development of small solar or renewable energy facilities. In July, FERC issued a decision restating that the Federal Power Act and PURPA 210, not state (or local) legislation, govern the price that local utilities may pay under FITs. (author)

  20. Analysis of the premitting processes associated with exploration of Federal OCS leases. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-11-01T23:59:59.000Z

    Under contract to the Office of Leasing Policy Development (LPDO), Jack Faucett Associates is currently undertaking the description and analysis of the Outer Continental Shelf (OCS) regulatory process to determine the nature of time delays that affect OCS production of oil and gas. This report represents the results of the first phase of research under this contract, the description and analysis of regulatory activity associated with exploration activities on the Federal OCS. Volume 1 contains the following three sections: (1) study results; (2) Federal regulatory activities during exploration of Federal OCS leases which involved the US Geological Survey, Environmental Protection Agency, US Coast Guard, Corps of Engineers, and National Ocean and Atmospheric Administration; and (3) state regulatory activities during exploration of Federal OCS leases of Alaska, California, Louisiana, Massachusetts, New Jersey, North Carolina, and Texas. Volume II contains appendices of US Geological Survey, Environmental Protection Agency, Coast Guard, Corps of Engineers, the Coastal Zone Management Act, and Alaska. The major causes of delay in the regulatory process governing exploration was summarized in four broad categories: (1) the long and tedious process associated with the Environmental Protection Agency's implementation of the National Pollutant Discharge Elimination System Permit; (2) the lack of mandated time periods for the completion of individual activities in the permitting process; (3) the lack of overall coordination of OCS exploratory regulation; and (4) the inexperience of states, the Federal government and industry relating to the appropriate level of regulation for first-time lease sale areas.

  1. RECOMMENDED SECURITY CONTROLS FOR FEDERAL

    E-Print Network [OSTI]

    May 2005 RECOMMENDED SECURITY CONTROLS FOR FEDERAL INFORMATION SYSTEMS: GUIDANCE FOR SELECTING COST-EFFECTIVE CONTROLS USING A RISK-BASED PROCESS Shirley Radack, Editor, Computer Security Division, Information Technology Laboratory National Institute of Standards and Technology Security controls are the management

  2. Mr Schmidt, Federal Minister Schavan,

    E-Print Network [OSTI]

    Spang, Rainer

    1 Mr Schmidt, Federal Minister Schavan, Presidents of the academies, allied organisations and responsibility. Mr Schmidt, thank you so much for taking the time to be here with us today. We are certainly `in Planck Society. In 1911, the membership fee was set at 1,000 marks a year, plus an initial contribution

  3. FEDERAL COMMUNICATIONS COMMISSION Washington, DC

    E-Print Network [OSTI]

    Peha, Jon M.

    1 Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC GN Docket No. 14-28 In the Matter 15213-3890 peha@cmu.edu July 15, 2014 #12;2 Executive Summary It is important for the Commission situated entity. This policy would particularly benefit new entrepreneurial ventures. The Commission should

  4. GOVERNING COUNCIL Asbestos Management Policy

    E-Print Network [OSTI]

    Boonstra, Rudy

    : · The University will establish an Asbestos Management Program which will outline a comprehensive system to actively manage and stringently control all asbestos-containing materials in University buildings, and allGOVERNING COUNCIL Asbestos Management Policy June 23, 2011 To request an official copy

  5. University of Toronto Governing Council

    E-Print Network [OSTI]

    Sun, Yu

    , overall cost estimate and sources of funds) as defined in the Project Planning Report Business BoardfiVO AR BO R VELUT University of Toronto Governing Council W eb C opy Policy on Capital Planning and Capital Projects June 28, 2001 To request an official copy of this policy, contact: The Office

  6. Florida Atlantic University Student Government

    E-Print Network [OSTI]

    Fernandez, Eduardo

    : The purpose of club funding is to assist Florida Atlantic University recognized student clubs2 #12;2 Florida Atlantic University Student Government Council of Student Organizations (COSO) Boca Raton Campus Funding and Emergency Funding Policies and Procedures CHAPTER I: STATEMENTS Title A

  7. Australian Government on ILLEGAL logging

    E-Print Network [OSTI]

    Australian Government the AXE on ILLEGAL logging Bringing down a practical approach AN AUSTRALIAN. NOVEMBER 2006 #12;#12;Foreword Illegal logging corrupts the trade in timber-based products and inevitably management of the world's forest resources. Therefore, it is in Australia's interests to stop illegal logging

  8. Government 2020 and the perpetual

    E-Print Network [OSTI]

    -based strategic insights for senior executives around critical public and private sector issues. This executive;1 The future of societies around the world is being shaped by six drivers outside the realm of government control. Powerful changes related to demographics, globalization, environmental concerns, societal

  9. Federal Energy and Water Efficiency Project Financing | Department...

    Office of Environmental Management (EM)

    Federal Energy and Water Efficiency Project Financing Federal Energy and Water Efficiency Project Financing The Federal Energy Management Program (FEMP) offers financing options...

  10. Greening Federal Facilities: An Energy, Environmental, and Economic...

    Energy Savers [EERE]

    Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition Greening Federal Facilities: An...

  11. 2010 Federal Energy and Water Management Award Winners | Department...

    Office of Environmental Management (EM)

    10 Federal Energy and Water Management Award Winners 2010 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals,...

  12. 2003 Federal Energy and Water Management Award Winners | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Federal Energy and Water Management Award Winners 2003 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals,...

  13. 2011 Federal Energy and Water Management Award Winners | Department...

    Office of Environmental Management (EM)

    1 Federal Energy and Water Management Award Winners 2011 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals,...

  14. 2004 Federal Energy and Water Management Award Winners | Department...

    Office of Environmental Management (EM)

    2004 Federal Energy and Water Management Award Winners 2004 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals,...

  15. 2009 Federal Energy and Water Management Award Winners | Department...

    Office of Environmental Management (EM)

    9 Federal Energy and Water Management Award Winners 2009 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals,...

  16. 2007 Federal Energy and Water Management Award Winners | Department...

    Energy Savers [EERE]

    7 Federal Energy and Water Management Award Winners 2007 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals,...

  17. 2005 Federal Energy and Water Management Award Winners | Department...

    Energy Savers [EERE]

    5 Federal Energy and Water Management Award Winners 2005 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals,...

  18. 2008 Federal Energy and Water Management Award Winners | Department...

    Energy Savers [EERE]

    8 Federal Energy and Water Management Award Winners 2008 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals,...

  19. Federal Technology Deployment Pilot: Exterior Solid State Lighting...

    Energy Savers [EERE]

    Federal Technology Deployment Pilot: Exterior Solid State Lighting Federal Technology Deployment Pilot: Exterior Solid State Lighting Presentation-given at the Fall 2011 Federal...

  20. Real Options Valuation of U.S. Federal Renewable Energy Research,Development, Demonstration, and Deployment

    SciTech Connect (OSTI)

    Siddiqui, Afzal S.; Marnay, Chris; Wiser, Ryan H.

    2005-03-01T23:59:59.000Z

    Benefits analysis of US Federal government funded research, development, demonstration, and deployment (RD3) programs for renewable energy (RE) technology improvement typically employs a deterministic forecast of the cost and performance of renewable and nonrenewable fuels. The benefits estimate for a program derives from the difference between two forecasts, with and without the RD3 in place. The deficiencies of the current approach are threefold: (1) it does not consider uncertainty in the cost of non-renewable energy (NRE), and the option or insurance value of deploying RE if and when NRE costs rise; (2) it does not consider the ability of the RD3 manager to adjust the RD3 effort to suit the evolving state of the world, and the option value of this flexibility; and (3) it does not consider the underlying technical risk associated with RD3, and the impact of that risk on the programs optimal level of RD3 effort. In this paper, a rudimentary approach to determining the option value of publicly funded RE RD3 is developed. The approach seeks to tackle the first deficiency noted above by providing an estimate of the options benefit of an RE RD3 program in a future with uncertain NRE costs.While limited by severe assumptions, a computable lattice of options values reveals the economic intuition underlying the decision-making process. An illustrative example indicates how options expose both the insurance and timing values inherent in a simplified RE RD3 program that coarsely approximates the aggregation of current Federal RE RD3.This paper also discusses the severe limitations of this initial approach, and identifies needed model improvements before the approach can adequately respond to the RE RD3 analysis challenge.

  1. governance

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysisDarby Dietrich5 |0/%2A0/%2A

  2. Advanced Metering Implementations - A Perspective from Federal Sector

    SciTech Connect (OSTI)

    Eaarni, Shankar

    2014-08-11T23:59:59.000Z

    Federal mandate (EPACT 2005) requires that federal buildings install advanced electrical meters-meters capable of providing data at least daily and measuring the consumption of electricity at least hourly. This work presents selected advanced metering implementations to understand some of the existing practices related to data capture and to understand how the data is being translated into information and knowledge that can be used to improve building energy and operational performance to meet federal energy reduction mandates. This study highlights case studies to represent some of the various actions that are being taken based on the data that are being collected to improve overall energy performance of these buildings. Some of these actions include- individualized tenant billing and energy forecasting, benchmarking, identifying energy conservation measures, measurement and verification.

  3. You have the power. 1997 Federal Energy Management Program report

    SciTech Connect (OSTI)

    NONE

    1998-04-01T23:59:59.000Z

    From 1985 to 1996, the Federal investment in energy efficiency totaled $2 billion. This investment achieved a cumulative savings of $6.3 billion in the nation`s energy bill when calculated from a 1985 baseline. The Energy Policy Act of 1992 and Executive Order 12902 require a rate of even greater energy savings than the pace already set. FEMP`s leadership and accomplishments for FY 1997 have helped Federal agencies meet their challenges and attain their goals by: increasing partnerships with the private sector; providing cost effective quality services and tools; integrating energy efficiency into procurement; increasing Federal employee energy awareness; influencing outcomes by promoting good energy habits; and increasing the number and scope of energy efficiency projects.

  4. Guide on Federal Employee Assistance Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-12-01T23:59:59.000Z

    This Guide supplements the requirements and responsibilities specified in DOE O 341.1, Federal Employee Health Services, dated 12-1-03, and applies only to Federal employees. Canceled by DOE G 341.1-2A.

  5. Federal Buildings Personnel Training Act of 2010

    Broader source: Energy.gov [DOE]

    On December 14, 2010, President Obama signed the Federal Buildings Personnel Training Act of 2010 into law. This legislation will have an important impact on Federal agency training programs geared...

  6. Energy Efficiency Policy in the United States: Overview of Trends at Different Levels of Government

    SciTech Connect (OSTI)

    Doris, E.; Cochran, J.; Vorum, M.

    2009-12-01T23:59:59.000Z

    This report catalogs by sector--buildings, transportation, industrial, and power--energy efficiency policies at the federal, state, and local levels, and identifies some prominent policy trends. Four key findings emerged from this report: 1) leadership on energy efficiency is necessary--and is found--at each level of government; 2) there is no widely accepted methodology for evaluating energy efficiency policies; 3) coordination among the three levels of government--and across sectors--is increasingly important, and there are opportunities to significantly improve policy performance through a unified strategy; and 4) there are efficiencies to be gained by informing policies in one sector with experience from others.

  7. Appliance Standards and Rulemaking Federal Advisory Committee...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issuance Appliance Standards and Rulemaking Federal Advisory Committee (ASRAC) - Central Air Conditioner Regional Standards Enforcement Working Group; Notice of Open...

  8. Federal Register Notice: National Nuclear Security Administration...

    Office of Environmental Management (EM)

    Site-Wide Environmental Impact Statement for Sandia National Laboratories, New Mexico (SNLNM) Federal Register Notice: National Nuclear Security Administration...

  9. FY 2011 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  10. Federal Incentives for Water Power (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-05-01T23:59:59.000Z

    This fact sheet describes the federal incentives available as of April 2013 for the development of water power technologies.

  11. FY 2009 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  12. FY 2010 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  13. FY 2007 Honeywell Federal Manufacturing & Technologies, LLC,...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  14. FY 2008 Honeywell Federal Manufacturing & Technologies, LLC,...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  15. FY 2006 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    Honeywell Federal Manufacturing & Technologies, LLC, PER Summary | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  16. The federal market for ESCO services: How does it measure up?

    SciTech Connect (OSTI)

    Hopper, Nicole; Goldman, Charles; Birr, Dave

    2004-05-17T23:59:59.000Z

    The federal market has been a source of strong energy service company (ESCO) industry growth over the last decade as traditional MUSH markets municipal/state governments, universities, schools and hospitals have matured. Federal alternative financing programs Utility Energy Services Contracts (UESC) and Department of Energy (DOE) Super, Army and Air Force Energy Savings Performance Contracts (ESPC) have enabled this growth, but recent events threaten the ESPC programs. We compare the federal and MUSH markets by analyzing {approx} ;1550 completed projects and interviewing ESCO representatives. Federal ESPC market activity is estimated at {approx} ;$1.6 billion (B) over 10-15 years; activity in 2002 was {approx} ;$230 million (M). MUSH markets have produced {approx} ; $12-16B in projects over 20 years, and {approx} ;$0.8-1.0B in 2002. Federal sector projects have longer average contract terms than MUSH (14 vs. 9.5 years respectively). Federal projects are larger (median costs are $1.85M vs. $0.98M for MUSH), but costs per square foot are lower (median costs are $2.08/ft2 vs. $2.93/ft2 for MUSH), and annual energy savings are higher (18 vs. 14 kBtu/ft2). Non-energy savings are more often counted in federal projects (58 percent vs. 35 percent of MUSH projects) but when counted represent a higher proportion of savings in MUSH projects. Median payback times in the federal market are shorter than MUSH (7.7 vs. 8.8 years) and calculated net economic benefits of 214 federal projects amount to {approx} ;$550M, compared to {approx} ;$1.2B for 965 MUSH projects.

  17. Guidance: Requirements for Installing Renewable Fuel Pumps at Federal Fleet Fueling Centers under EISA Section 246: Federal Fleet Program, Federal Energy Management Program, U.S. Department of Energy, March 2011

    SciTech Connect (OSTI)

    Not Available

    2011-03-01T23:59:59.000Z

    On December 19, 2007, the Energy Independence and Security Act of 2007 (EISA) was signed into law as Public Law 110-140. Section 246(a) of EISA directs Federal agencies to install at least one renewable fuel pump at each Federal fleet fueling center under their jurisdiction by January 1, 2010. Section 246(b) requires the President to submit an annual report to Congress on Federal agency progress in meeting this renewable fuel pump installation mandate. This guidance document provides guidelines to help agencies understand these requirements and how to comply with EISA Section 246.

  18. FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

    E-Print Network [OSTI]

    Bove Jr., V. Michael

    FCC 96­207 Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554 In the Matter to the advancement of digital television and related technologies by the Federal Communications Commission, its 617­253­0334, fax 617­258­6264 vmb@media.mit.edu #12; EXECUTIVE SUMMARY The Federal Communications

  19. What HERA May Provide?

    SciTech Connect (OSTI)

    Jung, Hannes; /DESY; De Roeck, Albert; /CERN; Bartels, Jochen; /Hamburg U., Inst. Theor. Phys. II; Behnke, Olaf; Blumlein, Johannes; /DESY; Brodsky, Stanley; /SLAC /Durham U., IPPP; Cooper-Sarkar, Amanda; /Oxford U.; Deak, Michal; /DESY; Devenish, Robin; /Oxford U.; Diehl, Markus; /DESY; Gehrmann, Thomas; /Zurich U.; Grindhammer, Guenter; /Munich, Max Planck Inst.; Gustafson, Gosta; /CERN /Lund U., Dept. Theor. Phys.; Khoze, Valery; /Durham U., IPPP; Knutsson, Albert; /DESY; Klein, Max; /Liverpool U.; Krauss, Frank; /Durham U., IPPP; Kutak, Krzysztof; /DESY; Laenen, Eric; /NIKHEF, Amsterdam; Lonnblad, Leif; /Lund U., Dept. Theor. Phys.; Motyka, Leszek; /Hamburg U., Inst. Theor. Phys. II /Birmingham U. /Southern Methodist U. /DESY /Piemonte Orientale U., Novara /CERN /Paris, LPTHE /Hamburg U. /Penn State U.

    2011-11-10T23:59:59.000Z

    More than 100 people participated in a discussion session at the DIS08 workshop on the topic What HERA may provide. A summary of the discussion with a structured outlook and list of desirable measurements and theory calculations is given. The HERA accelerator and the HERA experiments H1, HERMES and ZEUS stopped running in the end of June 2007. This was after 15 years of very successful operation since the first collisions in 1992. A total luminosity of {approx} 500 pb{sup -1} has been accumulated by each of the collider experiments H1 and ZEUS. During the years the increasingly better understood and upgraded detectors and HERA accelerator have contributed significantly to this success. The physics program remains in full swing and plenty of new results were presented at DIS08 which are approaching the anticipated final precision, fulfilling and exceeding the physics plans and the previsions of the upgrade program. Most of the analyses presented at DIS08 were still based on the so called HERA I data sample, i.e. data taken until 2000, before the shutdown for the luminosity upgrade. This sample has an integrated luminosity of {approx} 100 pb{sup -1}, and the four times larger statistics sample from HERA II is still in the process of being analyzed.

  20. EuropeanEuropean PanelPanel FederationFederation

    E-Print Network [OSTI]

    of fossil fuelsSimultaneously, the taxes on the use of fossil fuels increaseincrease ·· This leads are granting subsidies forGovernments in Europe are granting subsidies for building and operating biomass power ·· Increasing taxes on nonIncreasing taxes on non--RES fuelsRES fuels #12;The main problemThe main problem

  1. Federal Emergency Management Information System (FEMIS) System Administration Guide for FEMIS Version 1.5

    SciTech Connect (OSTI)

    Bower, John C. (BATTELLE (PACIFIC NW LAB)); Burnett, Robert A. (BATTELLE (PACIFIC NW LAB)); Carter, Richard J. (BATTELLE (PACIFIC NW LAB)); Downing, Timothy R. (BATTELLE (PACIFIC NW LAB)); Homer, Brian J. (BATTELLE (PACIFIC NW LAB)); Holter, Nancy A. (BATTELLE (PACIFIC NW LAB)); Johnson, Daniel M. (BATTELLE (PACIFIC NW LAB)); Johnson, Ranata L. (BATTELLE (PACIFIC NW LAB)); Johnson, Sharon M. (BATTELLE (PACIFIC NW LAB)); Loveall, Robert M. (BATTELLE (PACIFIC NW LAB)); Ramos Jr., Juan (BATTELLE (PACIFIC NW LAB)); Schulze, Stacy A. (BATTELLE (PACIFIC NW LAB)); Sivaraman, Chitra (BATTELLE (PACIFIC NW LAB)); Stephan, Alex J. (BATTELLE (PACIFIC NW LAB)); Stoops, Lamar R. (BATTELLE (PACIFIC NW LAB)); Wood, Blanche M. (BATTELLE (PACIFIC NW LAB))

    2001-12-01T23:59:59.000Z

    The Federal Emergency Management System (FEMIS) is an emergency management planning and response tool. The FEMIS System Administration Guide provides information on FEMIS System Administrator activities as well as the utilities that are included with FEMIS.

  2. Federal Grant, Loan, and Technical Assistance Programs for Tribal Energy Development

    Broader source: Energy.gov [DOE]

    This online tool developed by the White House Council on Native American Affairs Energy Subgroup provides a centralized repository of information on federal programs available to assist with tribal...

  3. Sales of Fossil Fuels Produced from Federal and Indian Lands, FY 2003 through FY 2011

    Broader source: Energy.gov [DOE]

    This paper was prepared in response to recent requests that the U.S. Energy Information Administration (EIA) provide updated summary information regarding fossil fuel production on federal and...

  4. Dual mandates or dueling mandates : federal energy efficiency programs and the Recovery Act

    E-Print Network [OSTI]

    Sklarsky, Joshua (Joshua Lee)

    2010-01-01T23:59:59.000Z

    In February 2009, President Barack Obama signed the American Recovery and Reinvestment Act (ARRA) into law, providing billions of dollars in funding for federal energy efficiency programs. ARRA represented different things ...

  5. FOA for Assisting Federal Facilities with Energy Conservation Technologies Informational Webinar

    Broader source: Energy.gov [DOE]

    This webinar will highlight the funding opportunity announcement (FOA) that was issued on March 6, 2015. The AFFECT grant will provide funding for renewable energy projects at federal facilities...

  6. Effectiveness of Federal Government Programs to Promote Use of Energy-Conserving Industrial Equipment

    E-Print Network [OSTI]

    Newsom, D. E.; Evans, A. R.

    1981-01-01T23:59:59.000Z

    Argonne National Laboratory has conducted evaluations of possible industrial energy conservation policies for the U.S. Department of Energy. This paper discusses the evaluation of policy effectiveness, briefly describing the approach taken...

  7. Government Information in the Digital Age: The Once and Future Federal Depository Library Program

    E-Print Network [OSTI]

    Jacobs, James A; Jacobs, James R; Yeo, Shinjoung

    2005-01-01T23:59:59.000Z

    Concept of Operations (ConOps v 1.0) for the Future DigitalConcept of Operations (ConOps V1.0) for the Future Digital

  8. Government Information in the Digital Age: The Once and Future Federal Depository Library Program

    E-Print Network [OSTI]

    Jacobs, James A; Jacobs, James R; Yeo, Shinjoung

    2005-01-01T23:59:59.000Z

    of California’s California Digital Library (CDL) “has beenstored in separate digital library collections, fromat the California Digital Library summed up the preservation

  9. The role of the U.S. Federal Government in the student loan industry

    E-Print Network [OSTI]

    Mungovan, Patrick M. (Patrick Mullahy)

    2005-01-01T23:59:59.000Z

    Beginning in the early 1980's, average tuition and fees for higher education institutions in the United States experienced two decades of unprecedented growth. Over the 10-year period ending in 2003-2004, average tuition ...

  10. CHP Education and Outreach Guide to State and Federal Government, Updated

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S. Department ofJune 2,The BigSidingState6 (2-91)A2015EnergyCESP0-01 I

  11. John Hale III Awarded Minority Federal Government Public Servant of the

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 111 1,613 122Commercial602 1,39732on ArmedManufacturing |Time-BasedIrvingDupuy About Us JohnYear

  12. APPENDIX A DISTRIBUTION LIST Federal Government Agencies Army Corps of Engineers, Sacramento District Headquarter Office

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015ofDepartmentDepartment of2 of 5) ALARA TrainingANDREW W. TUNNELL t:toA

  13. Report to Congress on the Progress of the Federal Government in Meeting the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreakingMay 2015 < prevQuickEnergy V-Belts withDepartment

  14. Buildings Energy Data Book: 8.5 Federal Government Water Usage

    Buildings Energy Data Book [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data Center HomeIdle Reduction WeightRebate -5 20054 Share221 Total Use345645

  15. NNSA Awards Contract for Largest Federal Wind Farm to Siemens Government

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved:AdministrationAnalysis andB -Reports |Y-12 |

  16. APPENDIX A DISTRIBUTION LIST Federal Government Agencies Army Corps of Engineers, Sacramento District Headquarter Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del(ANL-IN-03-032)8Li (59AJ76) (See theDoctoral20ALSNewstt^ \AP-XPSSummaryDemonstration

  17. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2008

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual Planning3Annual

  18. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual Planning3Annual

  19. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual Planning3Annual

  20. Annual Report on Federal Government Energy Management and Conservation Programs Fiscal Year 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual Planning3Annual

  1. Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual Planning3Annual

  2. Annual Report on Federal Government Energy Management and Conservation Programs, Fiscal Year 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual

  3. Annual Report to Congress on Federal Government Energy Management and Conservation Programs Fiscal Year 2007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual on

  4. Annual Report to Congress on Federal Government Energy Management and Conservation Programs, Fiscal Year 1999

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of1Albuquerque, NMPerformanceofEnergy 51 Annual on1999 January 11,

  5. OPEN GOVERNMENT | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy:Nanowire3627 FederalTransformers |OJT!LSU/CAMD Procedure Doc.OPEN

  6. Assignment of Responsibilities for Executive Order 131 48, Greening the Government Through Leadership In Environmental Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-04-21T23:59:59.000Z

    Executive Order 13148, Greening the Government Through Leadership in Environmental Management, was signed by the President on April 21, 2000. This Order establishes new goals and requirements for Federal agencies that complement many Department of Energy (DOE) initiatives under way. These new goals and requirements affirm DOE's approach to improving environmental performance through the use of management systems and aggressive pollution prevention initiatives. Does not cancel other directives.

  7. Subject: Export Controls and Trade Sanctions While federal regulations restricting the export of goods and technologies related to national

    E-Print Network [OSTI]

    Firestone, Jeremy

    Subject: Export Controls and Trade Sanctions While federal regulations restricting the export that the University of Delaware must comply with all U.S. government export control regulations. While the vast majority of the work carried out on our campuses falls within the several exemptions to export licensing

  8. Frequently Asked Questions: About Federal Fleet Management (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2009-10-01T23:59:59.000Z

    Answers to frequently asked questions about Federal fleet management, Federal requirements, reporting, advanced vehicles, and alternative fuels.

  9. Federal Energy Consumption and Progress Made toward Requirements

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) tracks Federal agency energy consumption and progress toward achieving energy laws and requirements.

  10. DOE Encourages Utility Sector Nominations to the Federal Communication...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Federal Communications Commission's Communications, Security, Reliability, and Interoperability Council DOE Encourages Utility Sector Nominations to the Federal Communications...

  11. Gregory H. Friedman: Provided for The Committee on Oversight and Government

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 RussianBy: Thomas P. D'Agostino,Glen WattmanInvestigationsand Natural Resources

  12. UNC Charlotte Government Property Management Plan 1 Government Property Management Plan

    E-Print Network [OSTI]

    Howitt, Ivan

    . MANAGEMENT AND ACQUISITION Under the University's property management system, the Materials ManagementUNC Charlotte Government Property Management Plan 1 Government Property Management Plan Initially approved: 21 October 2011 Updated: August 24, 2012 SCOPE This Government Property Management Plan applies

  13. 1995 Federal Research and Development Program in Materials Science and Technology

    SciTech Connect (OSTI)

    None

    1995-12-01T23:59:59.000Z

    The Nation's economic prosperity and military security depend heavily on development and commercialization of advanced materials. Materials are a key facet of many technologies, providing the key ingredient for entire industries and tens of millions of jobs. With foreign competition in many areas of technology growing, improvements in materials and associated processes are needed now more than ever, both to create the new products and jobs of the future and to ensure that U.S. industry and military forces can compete and win in the international arena. The Federal Government has invested in materials research and development (R&D) for nearly a century, helping to lay the foundation for many of the best commercial products and military components used today. But while the United States has led the world in the science and development of advanced materials, it often has lagged in commercializing them. This long-standing hurdle must be overcome now if the nation is to maintain its leadership in materials R&D and the many technologies that depend on it. The Administration therefore seeks to foster commercialization of state-of-the-art materials for both commercial and military use, as a means of promoting US industrial competitiveness as well as the procurement of advanced military and space systems and other products at affordable costs. The Federal R&D effort in Fiscal Year 1994 for materials science and technology is an estimated $2123.7 million. It includes the ongoing R&D base that support the missions of nine Federal departments and agencies, increased strategic investment to overcome obstacles to commercialization of advanced materials technologies, interagency cooperation in R&D areas of mutual benefit to leverage assets and eliminate duplicative work, cost-shared research with industrial and academic partners in critical precompetitive technology areas, and international cooperation on selected R&D topics with assured benefits for the United States. The materials R&D program also supports the Administration's specific technological objectives, emphasizing development of affordable, high-performance commercial and military aircraft; ultra-fuel-efficient, low-emissions automobiles that are also safe and comfortable; powerful yet inexpensive electronic systems; environmentally safe products and processes; and a durable building and transportation infrastructure.

  14. FY 2008 E-Government Act Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 E-Government Act Report FY 2008 E-Government Act Report FY 2008 E-Government Act Report FY 2008 E-Government Act Report More Documents & Publications FY 2008 E-Government Act...

  15. Summary of the Assembly Government Woodland Estate Research Report

    E-Print Network [OSTI]

    estate in delivering Woodlands for Wales, the government's woodland strategy for the next 50 years1 be delegated to third parties, such as local communities or the private sector. Over the last 20 years woodland, water quality and renewable energy, restore ancient woodland and provide access for people

  16. National Seismological Network HIS MAJESTY'S GOVERNMENT OF NEPAL

    E-Print Network [OSTI]

    Avouac, Jean-Philippe

    National Seismological Network HIS MAJESTY'S GOVERNMENT OF NEPAL Lainchour Kathmandu, Nepal March the establishment of Nepal's first seismic station at Phulchoki, Kathmandu in November, 1978 by the Department hazard assessment in the Nepal Himalaya. The network provides routine information on global seismicity

  17. Part II: Bilateral Consultative Arrangements Asia Memorandum of Understanding Between the Government of the United States of America and

    E-Print Network [OSTI]

    facilitated the logistics and travel costs of FLEC officers. China has provided a total of 79 enforcement the Government of the United States of America and the Government of the People's Republic of China on Effective and the Government of the People's Republic of China on Effective Cooperation and Implementation of United Nations

  18. Federal Memorandum of Understanding for Hydropower/Federal Inland

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489 NoEurope BV JumpFederal Highway Administration Jump to:6 Jump

  19. Executive Order 13583, Establishing a Coordinated Government...

    Broader source: Energy.gov (indexed) [DOE]

    Initiative to Promote Diversity and Inclusion in the Federal Workforce DOE Ups the Ante for Diversity and Inclusion at the Department of Energy Secretary Chu speaks...

  20. Corporate governance : the case for Asian REITs

    E-Print Network [OSTI]

    Tan, Denise, S.M. Massachusetts Institute of Technology

    2009-01-01T23:59:59.000Z

    At the entity level, the design of sound corporate governance mechanisms is critical for REITs that are preparing to go public. At the industry level, issues of transparency and corporate governance are consequential to ...

  1. Conditional tests of corporate governance theories

    E-Print Network [OSTI]

    Chi, Jianxin

    2005-08-29T23:59:59.000Z

    Agency theories suggest that governance matters more when agency conflicts are potentially more severe. However, empirical studies often do not control for the potential severity of agency conflicts. I show that the marginal benefit of governance...

  2. Policies of different governments : persistence and interactions

    E-Print Network [OSTI]

    Ricka, Frantisek

    2008-01-01T23:59:59.000Z

    This dissertation consists of three chapters on persistence and interactions of policies of different governments in various settings. Chapter 1 studies government policy persistence when firms face capital installation ...

  3. Local government citizen academies : is knowledge power?

    E-Print Network [OSTI]

    Marcus, Adam Scott

    2007-01-01T23:59:59.000Z

    Government decision-makers and especially urban planners increasingly face difficulties engaging citizens given trends of public apathy, cynicism towards government, language and cultural barriers, and the growing complexity ...

  4. Investigation of governance in Scottish charities 

    E-Print Network [OSTI]

    Lambert, Victoria

    2011-11-23T23:59:59.000Z

    This thesis investigates governance in large Scottish charities. In particular, the focus is on internal aspects of governance, predominantly the functioning of the board. The influence of business on charities is also ...

  5. GOVERNANCE DOCUMENTS BOWLING GREEN STATE UNIVERSITY

    E-Print Network [OSTI]

    Moore, Paul A.

    GOVERNANCE DOCUMENTS BOWLING GREEN STATE UNIVERSITY BOWLING GREEN, OH 43403 Governance Document I...........................................................................................I THE UNIVERSITY COMMUNITY............................................................................II Membership........................................................................................II.G THE PRESIDENT OF THE UNIVERSITY.................................................................III Presidential

  6. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect (OSTI)

    Not Available

    1985-01-01T23:59:59.000Z

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  7. Benefit-cost analysis of DOE's Current Federal Program to increase hydrothermal resource utilization. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-12-10T23:59:59.000Z

    The impact of DOE's Current Federal Program on the commercialization of hydrothermal resources between 1980 and 2000 is analyzed. The hydrothermal resources of the United States and the types of DOE activities used to stimulate the development of these resources for both electric power and direct heat use are described briefly. The No Federal Program and the Current Federal Program are then described in terms of funding levels and the resultant market penetration estimates through 2000. These market penetration estimates are also compared to other geothermal utilization forecasts. The direct benefits of the Current Federal Program are next presented for electric power and direct heat use applications. An analysis of the external impacts associated with the additional hydrothermal resource development resulting from the Current Federal Program is also provided. Included are environmental effects, national security/balance-of-payments improvements, socioeconomic impacts and materials requirements. A summary of the analysis integrating the direct benefits, external impacts and DOE program costs concludes the report.

  8. Power Purchase Agreement Checklist for State and Local Governments

    SciTech Connect (OSTI)

    Cory, K.; Canavan, B.; Koenig, R.

    2009-10-01T23:59:59.000Z

    This fact sheet provides information and guidance on the solar photovoltaic (PV) power purchase agreement (PPA), which is a financing mechanism that state and local government entities can use to acquire clean, renewable energy. It addressed the financial, logistical, and legal questions relevant to implementing a PPA, but we do not examine the technical details?those can be discussed later with the developer/contractor. This fact sheet is written to support decision makers in U.S. state and local governments who are aware of solar PPAs and may have a cursory knowledge of their structure but they still require further information before committing to a particular project.

  9. Open Government | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItemResearch > TheNuclear Astrophysics One ofSpeedingthis site » Open Government Open

  10. DOE-TSPP-10, Conversion of DOE Technical Standards to Non-Government Standards- July 1, 2009

    Broader source: Energy.gov [DOE]

    This procedure provides guidance on the conversion of DOE Technical Standards to Voluntary Consensus Standards (VCSs), also referred to as non-Government standards.

  11. DOE-TSPP-10, Conversion of DOE Technical Standards to Non-Government Standards- August 1, 2000

    Broader source: Energy.gov [DOE]

    This procedure provides guidance on the conversion of DOE Technical Standards to Voluntary Consensus Standards (VCSs), also referred to as non-Government standards.

  12. Fiscal Federalism and Electoral Accountability

    E-Print Network [OSTI]

    Aidt, Toke S; Dutta, J

    is not just a question of theoretical interest. It is an issue of great practical importance as well. The ongoing debate about the 3See Dhillon and Peralta (2002) for a good survey of the literature on voter turnout. 3 appropriate role of the European Union... complete proofs in Appendix I. In section 5, we tailor the general model to the case of local public goods and ?scal federalism and present the main results of the paper. In section 6, we discuss the implications of our analysis for ?scal integration...

  13. Format for Federal Register Notice

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently20,000 RussianBy: Thomas P. D'Agostino, Undersecretary forCITIFormat for Federal

  14. Federal Energy Management Success Stories

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2: FinalOffers New Training on Energy6 Federal Energy Management Success Stories en FEMP and

  15. Federal Regulations | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you sure you want toworldPowerHome |CookingFAQsFacilityFederal Regulations

  16. Federal Real Property Council Guidance

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,OfficeEnd ofEvaluations in Covered FacilitiesAfterofFLASH 2004-12 April 5,Federal

  17. 2010 Federal Employee Viewpoint Survey

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of BadTHE U.S. DEPARTMENTTechnologies09Combustion2/2010 1 2010Federal

  18. Federal Register | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489 NoEurope BV JumpFederal Highway Administration JumpRegister

  19. A Diffusion Study of the Federally Mandated School Wellness Policy 

    E-Print Network [OSTI]

    Harriger, Dinah Jane

    2012-10-19T23:59:59.000Z

    distinct stages. (Note: See Figure 1.1 and Appendix A) o Phase 1 = Initiation Phase o Stage 1 = Agenda Setting o Stage 2 = Matching o Phase 2 = Implementation Phase o Stage 3 = Re-defining o Stage 4 = Clarifying o Stage 5 = Routinizing 5... Overview To provide a comprehensive, theoretically-driven analysis of the federally mandated School Wellness Policy, the study was conducted in three segments. Chapter II explored the policy initiation process (Phase 1 (Initiation) = agenda setting...

  20. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-25T23:59:59.000Z

    The purpose of this Guide is to provide U.S. Department of Energy (DOE) line management with guidance that may be useful to them in effectively and efficiently implementing the requirements of DOE O 226.1B, Implementation of Department of Energy Oversight Policy, date April 25, 2011, as applied to Federal line management of hazard category 1, 2, and 3 nuclear facilities.

  1. The Greening of Government: A Study of How Governments Define the Green Agenda

    E-Print Network [OSTI]

    The Greening of Government: A Study of How Governments Define the Green Agenda Executive Summary Institute for Electronic Government, IBM Corporation Page 2 This page is intentionally blank. In the green Corporation Page 3 Foreword What are governments doing to `green' themselves? How do they define their green

  2. A Step by Step Tool Kit for Local Governments to Go Solar

    Broader source: Energy.gov [DOE]

    This tool kit provides an array of strategies and options that local governments can implement to help encourage solar developments in their region, including amending general plans, incentivizing energy efficiency measures and solar installations, and educating local home builders about existing solar incentives. It also includes model ordinances and resolutions to help local governments promote solar development.

  3. CONSULTATION RESPONSE Wellcome Trust response to DFID Consultation on UK Government's Institutional

    E-Print Network [OSTI]

    Rambaut, Andrew

    . The Wellcome Trust invests substantially in research around global health issues and we have a number of major for working with WHO. The Strategy provides an opportunity to consolidate the Government's approach to WHO issues. Rather than focusing solely on government, the Strategy should also take into account how other

  4. The perceived power: government and taxation during the American Civil War

    E-Print Network [OSTI]

    Flaherty, Jane

    2006-04-12T23:59:59.000Z

    government sustained itself primarily through import duties. Collecting tariffs emerged as the most efficient and cost effective means of providing revenue for the central authority. Taxing citizens through imports also complemented the federalist... tariffs to aid industrial development. Debates on the role of the national government continued, however one dominant 31 James L. Huston, ?The American Revolutionaries, the Political Economy...

  5. Demand Response Providing Ancillary A Comparison of Opportunities and

    E-Print Network [OSTI]

    LBNL-5958E Demand Response Providing Ancillary Services A Comparison of Opportunities Government or any agency thereof or The Regents of the University of California. #12;Demand Response System Reliability, Demand Response (DR), Electricity Markets, Smart Grid Abstract Interest in using

  6. Memorandum of Understanding Regarding Coordination in Federal...

    Energy Savers [EERE]

    transmission facilities on federal lands. In most instances, the Departments of Agriculture or Interior will be the Lead Agency, since they have jurisdiction over most of the...

  7. Federal Energy Resources Modernization Coordinating Committee

    SciTech Connect (OSTI)

    Parker, G.B.

    1993-04-01T23:59:59.000Z

    This report summarizes the broad range of activities that are focused on meeting the President's Executive Order on Federal Energy Management promulgated to meet energy savings goals and encourage more efficient management of all federal energy resources. These activities are reported semiannually under the auspices of the Federal Energy Resource Modernization (FERM) Coordinating Committee, and as such include activities undertaken from April 1, 1992, through September 30, 1992. The activities reported are classified into four major categories: (1) technology-base support, which includes development of processes, software, metering and monitoring equipment and strategies, and other tools for federal energy managers to better understand and characterize their energy resources; (2) federal energy systems testing and monitoring; (3) federal energy systems revitalization projects at federal installations in cooperation with the utilities serving the sites; and (4) energy supply, distribution and end-use conservation assessment for federal agencies and/or facilities. Lighting systems and air conditioning projects at federal facilities, especially military bases are updated.

  8. Executive Order 13423: Strengthening Federal Environmental, Energy...

    Broader source: Energy.gov (indexed) [DOE]

    text of Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. eo13423.pdf More Documents & Publications Executive Order 13423-...

  9. Federal Utility Partnership Working Group Industry Commitment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Industry Commitment Federal Utility Partnership Working Group Industry Commitment Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist...

  10. Environmental audit program design guidelines for federal agencies

    SciTech Connect (OSTI)

    Edward, J.R.; Young, B.M.

    1989-08-01T23:59:59.000Z

    The goal of environmental management is to reduce environmental pollution and minimize risks associated with a facility's production, operations and maintenance. An environmental management program oversees the environmental functions within an agency, generally providing guidance and technical support throughout the entire organization. An environmental audit program is a critical component of an agency's ongoing environmental management program. Auditing increasingly is being used as a systematic method for verifying compliance with applicable statutes and regulations, evaluating the effectiveness of environmental management systems already in place, and identifying unregulated risks present at a facility. In essence, environmental auditing provides the data for a facility or agency to prepare a report card to ensure that the goals and objectives of their ongoing environmental program are achieved. The Environmental Protection Agency (EPA) defines environmental auditing as a systematic, documented, periodic and objective review of facility operations and practices related to meeting environmental requirements. In addition, EPA policy encourages all Federal agencies to develop auditing programs and offers technical assistance to help Federal agencies design audit programs. The guidance document is one means by which EPA is following through on its commitment to provide such assistance to other Federal agencies.

  11. Paul S. Gravel Federal Internship Application Page 1 Paul S. Gravel Federal Internship Application

    E-Print Network [OSTI]

    Harms, Kyle E.

    Paul S. Gravel Federal Internship Application Page 1 Paul S. Gravel Federal Internship Application Internship Application Page 2 Title or Position are you interested in participating in a summer internship

  12. Culture, Law, and Finance: Cultural Dimensions of Corporate Governance Laws

    E-Print Network [OSTI]

    Licht, Amir N.; Goldschmidt, Chanan; Schwartz, Shalom H.

    2001-01-01T23:59:59.000Z

    Protection and Corporate Governance, 58 J. Fin. Econ.the legal approach to corporate governance by presenting newlegal rules of corporate governance. 5 The need to take

  13. Corporate Governance, State-Contingent Control Rights, and Financial Distress

    E-Print Network [OSTI]

    Rasmussen, Robert K.

    2004-01-01T23:59:59.000Z

    20-6:00 pm, Boalt 13 Corporate Governance, State-ContingentRobert K. Rasmussen Corporate Governance, State-ContingentTraditional accounts of corporate governance focus on how

  14. Corruption, Firm Governance, and the Cost of Capital

    E-Print Network [OSTI]

    Garmaise, Mark J; Liu, Jun

    2005-01-01T23:59:59.000Z

    David F. Larcker, “Corporate governance, chief ex- ecutiveof the world. Ine?ective corporate governance combined withof the world. Weak corporate governance therefore destroys ?

  15. U.S. Style Corporate Governance in Korea's Largest Companies

    E-Print Network [OSTI]

    Ehrlich, Craig; Kang, Dae-Seob

    2000-01-01T23:59:59.000Z

    E.g. , D. Gordon Smith, Corporate Governance and ManagerialPrinciples of Corporate Governance, http://www.oecd.orgdaf/Bank/OECD Global Corporate Governance Forum, Washington

  16. How Big a Problem is U.S. Corporate Governance?

    E-Print Network [OSTI]

    Kaplan, Steve

    2007-01-01T23:59:59.000Z

    suggests that poor corporate governance or managerial powertheories argue that corporate governance deteriorated in thestealing CEOs or poor corporate governance cannot possibly

  17. Choice as Regulatory Reform: The Case of Japanese Corporate Governance

    E-Print Network [OSTI]

    Milhaupt, Curtis

    2004-01-01T23:59:59.000Z

    Globalization of Corporate Governance: Convergence of Formthe idea that U.S. corporate governance was a model for AsiaWoochan Kim, Does Corporate Governance Predict Firms’ Market

  18. Providing protection: Agencies receive funding to repair, upgrade dams

    E-Print Network [OSTI]

    Wythe, Kathy

    2009-01-01T23:59:59.000Z

    Story by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations..., called floodwater retarding structures and built mostly in rural areas during the 1950s to 1970s, are aging and need repairing. Others now protect urban areas that have developed downstream and need upgrading to meet more stringent safety standards...

  19. Notes2Providers.doc -1-Notes to Retail Providers

    E-Print Network [OSTI]

    providers that purchase electricity from a power pool that submits an Annual Report to the Energy CommissionNotes2Providers.doc -1- Notes to Retail Providers February 2003 Power Source Disclosure an energy mix or fuel mix different than the California Mix, (Net System Power)i . As a retail provider you

  20. IEEE TRANSACTIONS ON CLOUD COMPUTING, VOL. XX, NO. X, XXXX 1 Cloud Federations in the Sky: Formation Game

    E-Print Network [OSTI]

    Grosu, Daniel

    IEEE TRANSACTIONS ON CLOUD COMPUTING, VOL. XX, NO. X, XXXX 1 Cloud Federations in the Sky federation, virtual machine, game theory. 1 INTRODUCTION CLOUDS are large-scale distributed computing sys (VM) instances. Cloud computing systems' ability to provide on de- mand access to always-on computing

  1. Federally Funded Programs Related to Building Energy Use: Overlaps, Challenges, and Opportunities for Collaboration

    SciTech Connect (OSTI)

    Cort, Katherine A.; Butner, Ryan S.; Hostick, Donna J.

    2010-10-01T23:59:59.000Z

    As energy efficiency in buildings continues to move from discreet technology development to an integrated systems approach, the need to understand and integrate complementary goals and targets becomes more pronounced. Whether within Department of Energy’s (DOE) Building Technologies Program (BTP), across the Office of Energy Efficiency and Renewable Energy (EERE), or throughout DOE and the Federal government, mutual gains and collaboration synergies exist that are not easily achieved because of organizational and time constraints. There also cases where federal agencies may be addressing similar issues, but with different (and sometimes conflicting) outcomes in mind. This report conducts a comprehensive inventory across all EERE and other relevant Federal agencies of potential activities with synergistic benefits. A taxonomy of activities with potential interdependencies is presented. The report identifies a number of federal program objectives, products, and plans related to building energy efficiency and characterizes the current structure and interactions related to these plans and programs. Areas where overlap occurs are identified as are the challenges of addressing issues related to overlapping goals and programs. Based on the input gathered from various sources, including 20 separate interviews with federal agency staff and contractor staff supporting buildings programs, this study identifies a number of synergistic opportunities and makes recommends a number of areas where further collaboration could be beneficial.

  2. 53164 Federal Register / Vol. 77, No. 170 / Friday, August 31, 2012 / Proposed Rules Federal Communications Commission.

    E-Print Network [OSTI]

    Communications Commission. Bulah P. Wheeler, Deputy Manager, Office of the Secretary, Office of Managing Director53164 Federal Register / Vol. 77, No. 170 / Friday, August 31, 2012 / Proposed Rules Federal Federal Railroad Administration 49 CFR Part 214 [Docket No. FRA­2008­0059, Notice No. 6] RIN 2130­AC37

  3. Federal Interagency Geothermal Activities 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the YouTube|6721Energy 3_adv_battery.pdf MoreEnergy Government Support forProgram

  4. The photovoltaic manufacturing technology project: A government/industry partnership

    SciTech Connect (OSTI)

    Mitchell, R.L.; Witt, C.E.; Mooney, G.D.

    1991-12-01T23:59:59.000Z

    The Photovoltaic Manufacturing Technology (PVMaT) project is a government/industry photovoltaic manufacturing research and development (R&D) project composed of partnerships between the federal government (through the US Department of Energy) and members of the US photovoltaic (PV) industry. It is designed to assist the US PV industry in improving manufacturing processes, accelerating manufacturing cost reductions for PV modules, increasing commercial product performance, and generally laying the groundwork for a substantial scale-up of US-based PV manufacturing plant capabilities. The project is being carried out in three separate phases, each focused on a specific approach to solving the problems identified by the industrial participants. These participants are selected through competitive procurements. Furthermore, the PVMaT project has been specifically structured to ensure that these PV manufacturing R&D subcontract awards are selected with no intention of either directing funding toward specific PV technologies (e.g., amorphous silicon, polycrystalline thin films, etc.), or spreading the awards among a number of technologies (e.g., one subcontract in each area). Each associated subcontract under any phase of this project is, and will continue to be, selected for funding on its own technical and cost merits. Phase 1, the problem identification phase, was completed early in 1991. Phase 2 is now under way. This is the solution phase of the project and addresses problems of specific manufacturers. The envisioned subcontracts under Phase 2 may be up to three years in duration and will be highly cost-shared between the US government and US industrial participants. Phase 3, is also under way. General issues related to PV module development will be studied through various teaming arrangements. 25 refs.

  5. Federal Aviation Administration Human Factors Team

    E-Print Network [OSTI]

    Ladkin, Peter B.

    Federal Aviation Administration Human Factors Team Report on: The Interfaces Between Flightcrews Générale de l'Aviation Civile (France), Douglas Aircraft Company, Federal Aviation Administration, European was produced by a team of highly qualified individuals from the FAA and the European Joint Aviation Authorities

  6. Marketing Milk Under Federal Orders in Texas.

    E-Print Network [OSTI]

    Stelly, Randall

    1960-01-01T23:59:59.000Z

    ............ .. ............................... Administration Expenses ................................................... ' Procedure for Establishing Federal Orders ..................... Order Changes .............................................................. , Order Termination...ITIN 959 JULY 1960 llarketinff Milk un er Federal Orders in Texas order ZAIm includes Beckman county, Oklahoma. 3Also includes eight counties in Oklahoma. TEXAS AGRICULTURAL EXPERIMENT STATION R. D. LEWIS, DIRECTOR. COLLEGE STATION, TEXAS...

  7. Federal Radiological Monitoring and Assessment Center

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-12-02T23:59:59.000Z

    To establish Department of Energy (DOE) policy, procedures, authorities, and requirements for the establishment of a Federal Radiological Monitoring and Assessment Center (FRMAC), as set forth in the Federal Radiological Emergency Response Plan (FRERP). This directive does not cancel another directive. Canceled by DOE O 153.1.

  8. Federal Trade Commission Necesita Crdito o Seguro?

    E-Print Network [OSTI]

    Comisión Federal de Comercio (Federal Trade Commission, FTC), la agencia nacional de protección del sus cuentas, es recolecta- da de su informe de crédito. A través de programas estadísticos, los a tiempo y en forma. Algunas compañías de seguros también usan la información en los informes de crédito

  9. Policy Title: Policy Number: Federal Student Aid

    E-Print Network [OSTI]

    Franco, John

    . All such officials shall further distribute the Code to their direct and indirect reports who havePolicy Title: Policy Number: Federal Student Aid Code of Conduct 1.3.3 Category: Administrative Office of the Bursar University of Cincinnati Federal Student Aid Code of Conduct, page 1 of 5 Background

  10. Potential for the Use of Energy Savings Performance Contracts to Reduce Energy Consumption and Provide Energy and Cost Savings in Non-Building Applications

    SciTech Connect (OSTI)

    Williams, Charles; Green, Andrew S.; Dahle, Douglas; Barnett, John; Butler, Pat; Kerner, David

    2013-08-01T23:59:59.000Z

    The findings of this study indicate that potential exists in non-building applications to save energy and costs. This potential could save billions of federal dollars, reduce reliance on fossil fuels, increase energy independence and security, and reduce greenhouse gas emissions. The Federal Government has nearly twenty years of experience with achieving similar energy cost reductions, and letting the energy costs savings pay for themselves, by applying energy savings performance contracts (ESPC) inits buildings. Currently, the application of ESPCs is limited by statute to federal buildings. This study indicates that ESPCs can be a compatible and effective contracting tool for achieving savings in non-building applications.

  11. Analysis of the permitting processes associated with exploration of Federal OCS leases. Final report. Volume II. Appendices

    SciTech Connect (OSTI)

    Not Available

    1980-11-01T23:59:59.000Z

    Under contract to the Office of Leasing Policy Development (LPDO), Jack Faucett Associates is currently undertaking the description and analysis of the Outer Continental Shelf (OCS) regulatory process to determine the nature of time delays that affect OCS production of oil and gas. This report represents the results of the first phase of research under this contract, the description and analysis of regulatory activity associated with exploration activities on the Federal OCS. Volume 1 contains the following three sections: (1) study results; (2) Federal regulatory activities during exploration of Federal OCS leases which involved the US Geological Survey, Environmental Protection Agency, US Coast Guard, Corps of Engineers, and National Ocean and Atmospheric Administration; and (3) state regulatory activities during exploration of Federal OCS leases of Alaska, California, Louisiana, Massachusetts, New Jersey, North Carolina and Texas. Volume II contains appendices of US Geological Survey, Environmental Protection Agency, Coast Guard, Corps of Engineers, the Coastal Zone Management Act, and Alaska. The major causes of delay in the regulatory process governing exploration was summarized in four broad categories: (1) the long and tedious process associated with the Environmental Protection Agency's implementation of the National Pollutant Discharge Elimination System Permit; (2) thelack of mandated time periods for the completion of individual activities in the permitting process; (3) the lack of overall coordination of OCS exploratory regulation; and (4) the inexperience of states, the Federal government and industry relating to the appropriate level of regulation for first-time lease sale areas.

  12. UNIT TYPE MILITARY PROVIDES IIT PROVIDES (Navy/Marines)

    E-Print Network [OSTI]

    Heller, Barbara

    UNIT TYPE MILITARY PROVIDES IIT PROVIDES Naval (Navy/Marines) 4 year­Type 1 Full tuition and fees. Room and board* for all 4 years. Navy (Must be currently enlisted personnel) STA-21 Seaman to Admiral

  13. Requirements Governing Water Quality Standards (West Virginia)

    Broader source: Energy.gov [DOE]

    This rule establishes the requirements governing the discharge or deposit of sewage, industrial wastes and other wastes into waters and establishes water quality standards.

  14. United States Government National Nuclear Security Administration...

    Broader source: Energy.gov (indexed) [DOE]

    United States Government National Nuclear Security Administration (NNSA) Savannah River Field Office (SRFO) Memorandum DATE: January 10, 2014 REPLY TO ATTN OF: sv (McAlhany,...

  15. Measuring the Economic Impacts of Federal Investments in Research

    SciTech Connect (OSTI)

    Olson, S; Merrill, S

    2011-08-31T23:59:59.000Z

    Measuring the Economic Impacts of Federal Investments in Research evaluates approaches to measuring the returns on federal research investments. This report identifies new methodologies and metrics that can be developed and used for assessing returns on research across a wide range of fields (biomedical, information technology, energy, agriculture, environment, and other biological and physical sciences, etc.), while using one or more background papers that review current methodologies as a starting point for the discussion. It focuses on tools that are able to exploit available data in the relatively near term rather than on methodologies that may require substantial new data collection. Over the last several years, there has been a growing interest in policy circles in identifying the payoffs from federal agency research investments, especially in terms of economic growth, competitiveness, and jobs. The extraordinary increase in research expenditures under the American Recovery and Reinvestment Act (ARRA) of 2009 and the President�������¢����������������s commitment to science and technology (S&T) funding increases going forward have heightened the need for measuring the impacts of research investments. Without a credible analysis of their outcomes, the recent and proposed increases in S&T funding may not be sustained, especially given competing claims for federal funding and pressures to reduce projected federal budget deficits. Motivated by these needs and requirements, Measuring the Economic Impacts of Federal Investments in Research reviews and discusses the use of quantitative and qualitative data to evaluate the returns on federal research and development (R&D) investments. Despite the job-focused mandate of the current ARRA reporting requirements, the impact of S&T funding extend well beyond employment. For instance, federal funding in energy research may lead to innovations that would reduce energy costs at the household level, energy imports at the national level, and greenhouse gas emissions at the global level. In principle, these benefits can be measured as a return on research investments, with appropriate consideration of time lags to research outcomes and attribution to private as well as public expenditure. With appropriate metrics, the same could be true for benefits to public health, environmental quality, and food productivity and security. Federal funding of research leads to the development of human capital that is deployed in a variety of occupations with economic and social impacts. Research also produces information that is used in formal (e.g., regulatory and judicial) and informal (e.g., firm and consumer) decision making processes. In addition to reviewing the range of work (by academics, consultants, and research agencies themselves) that has been done in measuring research outcomes and providing a forum to discuss their methods, this report also considers the different methodologies used across fields of research (e.g., agriculture and energy research) to identifies which are applicable to a range of federal S&T funding.

  16. Renewable energy for federal facilities serving native Americans: preprint

    SciTech Connect (OSTI)

    Eiffert, P.; Sprunt Crawley, A.; Bartow, K.

    2000-05-15T23:59:59.000Z

    The Federal Energy Management Program (FEMP) in the U.S. Department of Energy (DOE) is targeting Federal facilities serving Native American populations for cost-effective renewable energy projects. These projects not only save energy and money, they also provide economic opportunities for the Native Americans who assist in producing, installing, operating, or maintaining the renewable energy systems obtained for the facilities. The systems include solar heating, solar electric (photovoltaic or PV), wind, biomass, and geothermal energy systems. In fiscal years 1998 and 1999, FEMP co-funded seven such projects, working with the Indian Health Service in the U.S. Department of Health and Human Services, the Bureau of Indian Affairs in the U.S. Department of the Interior, and their project partners. The new renewable energy systems are helping to save money that would otherwise be spent on conventional energy and reduce the greenhouse gases associated with burning fossil fuels.

  17. Government`s response to the competitiveness problem

    SciTech Connect (OSTI)

    Gover, J.; Huray, P.; Carayannis, E.

    1997-11-01T23:59:59.000Z

    This paper presents an analysis of how the US government responded to the concern in the 1980`s that US companies were experiencing problems of competitiveness in international markets. By the mid 1980`s there was great and growing concern throughout the US that US companies were experiencing difficulties in international competition. Pressure on Congress to take action came from constituents seeking jobs and companies that would directly benefit (this usually means receive public money) from programs that Congress might initiate. The fact that most constituent calls to Congress were about job creation was lost in the on-rush of R&D performers seeking funds for their favorite R&D project. In response, Congress created the Advanced Technology Program, the Technology Transfer Initiative, and the Technology Reinvestment Project, expanded the responsibilities of ARPA/DARPA, increased funding for the Small Business Initiative, expanded the Manufacturing Extension Partnership, funded SEMATECH, and increased NSF funding for basic research at universities. Many of these programs were later criticized for being industrial welfare and several were cut-back or stopped. Retrospective analysis shows that few of these programs addressed the root cause of competitiveness difficulties. In fact, by the time most of these programs were in place, US companies were well on their way to correcting their competitiveness problems. In addition, few were relevant to companies` often expressed concerns about workforce training, regulatory costs, and access to foreign markets. Twenty percent reductions in health care costs, regulatory costs, and education costs could annually pump $500 billion into the US economy and make companies operating in the US much more competitive in international markets.

  18. UNITED STATES GOVERNMENT DEPARTMENT OF ENERGY

    Broader source: Energy.gov (indexed) [DOE]

    REPLY TO ATTN OF: SUBJECT: TO: NNSADOE AUG 0 1 2007 SET:SFB-002 Los Alamos Site Office Self-Assessment of the Federal Technical Capability Program Donald L. Winchell, Jr.,...

  19. Investments in fossil energy technology: How the government's fossil energy R&D program has made a difference

    SciTech Connect (OSTI)

    None

    1997-03-01T23:59:59.000Z

    America has the technological capacity to change its energy future. There is no reason, for example, why our nation must continue following a path of rising oil imports when billions of barrels of crude oil remain in domestic oil fields. There is no reason why we cannot continue to use our abundant supplies of high-value, low-cost coal when we have the scientific know-how to remove virtually all of its pollutants and reduce greenhouse gas emissions. There is no reason why we cannot turn increasingly to clean-burning natural gas and tap the huge supplies we know exist within our borders. We remain a nation rich in the fuels that have powered economic growth. Today 85 percent of the energy we use to heat our homes and businesses, generate our electricity, and fuel our vehicles comes from coal, petroleum and natural gas. As we move toward a new century, the contributions of these fuels will grow. By 2015, the United States is likely to require nearly 20 percent more energy than it uses today, and fossil fuels are projected to supply almost 88 percent of the energy Americans will consume. We have the scientific know-how to continue using our fossil fuel wealth without fear of environmental damage or skyrocketing costs. The key is technology - developing cutting edge concepts that are beyond the private sector's current capabilities. Some of the most important innovations in America's energy industry are the results of investments in the Federal government's fossil energy research and development programs. Today, our air and water are cleaner, our economy is stronger, and our industries are more competitive in the global market because these programs have produced results. This booklet summarizes many of these achievements. It is not a comprehensive list by any means. Still, it provides solid evidence that the taxpayers' investment in government fossil energy research has paid real and measurable dividends.

  20. Synthetic Genomics: Options for Governance

    E-Print Network [OSTI]

    Garfinkel, Michele

    2007-10-17T23:59:59.000Z

    Gene and genome synthesis, that is, constructing long stretches of DNA from constituent chemicals, provides scientists with new and unparalleled capabilities both for understanding biology and for using it for beneficial ...

  1. Federal Wind Energy Assistance through NREL (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-09-01T23:59:59.000Z

    NREL assists with wind resource assessment and development activities initiated by federal agencies to facilitate distributed renewable energy projects at federal agency sites. This brief outlines the process for requesting NREL assistance with federal wind energy projects.

  2. Emergency Water Assistance During Drought: Federal Non-Agricultural Programs

    E-Print Network [OSTI]

    Gilbes, Fernando

    Emergency Water Assistance During Drought: Federal Non-Agricultural Programs Nicole T. Carter43408 #12;Emergency Water Assistance During Drought: Federal Non-Agricultural Programs Congressional Federal Authorities. If a drought's effects overwhelm state or local resources, the President

  3. Interim Final Rule and Request for Comments, Federal Register...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings, which was published in the Federal Register on December 4,...

  4. Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook, June 2010, Federal Energy Management Program (FEMP)

    SciTech Connect (OSTI)

    Not Available

    2010-06-01T23:59:59.000Z

    Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

  5. Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook, July 2011, Federal Energy Management Program (FEMP)

    SciTech Connect (OSTI)

    Not Available

    2011-07-01T23:59:59.000Z

    Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

  6. What is the Federal Demonstration Project

    SciTech Connect (OSTI)

    Not Available

    1990-01-01T23:59:59.000Z

    The Federal Demonstration Project is a cooperative effort between a number of universities, a private research institute, and several federal agencies to increase research productivity by eliminating unnecessary administrative procedures and by streamlining and standardizing needed controls. The Project aims to locate responsibility for decision-making as close as possible to principal investigators while maintaining necessary institutional and agency oversight to ensure accountability. By freeing researchers from some of their paperwork burden, more efficient research administration systems will enable investigators to spend more of their time doing science and engineering. The Federal Demonstration Project is an outgrowth of an earlier activity sponsored by five major federal R D agencies at the Florida State University System and the University of Miami. In Florida, the focus was on standardizing and streamlining procedures for administering research grants after the grants had been awarded to the universities. (See Attachment 1 for descriptions of the demonstrations carried out under the Florida Demonstration Project). In May 1988, the most successful of the demonstrated procedures were approved by the US Office of Management and Budget for use in grants awarded by any federal agency to any research organization. The new procedures give agencies authority to waive requirements that grantees obtain federal approval prior to taking a number of administrative actions with respect to grant management. The FDP institutions together with the participating federal agencies are designing and demonstrating innovative research administration procedures and are assessing the impact of those new procedures.

  7. Money crunch looms for Federal cleanup effort

    SciTech Connect (OSTI)

    Lobsenz, G.

    1992-12-03T23:59:59.000Z

    In an unprecedented acknowledgement that federal facility cleanup activities face a money crunch, a federal-state advisory panel is preparing a new strategy to avert enforcement showdowns when funding cuts prevent federal agencies from meeting legally required cleanup schedules set by states. In a draft report the panel said states must recognize that some cleanup [open quotes]milestones[close quotes] will have to be delayed due to budget pressures - a concession that will be politically difficult in some states. At the same time, the panel said federal agencies must be more forthcoming in working with states and local groups to determine how increasingly scarce resources will be distributed. As a general rule, the report recommended that federal agencies and state environmental officials agree on a [open quotes]fair share[close quotes] allocation method under which the pain of a budget cutback would be spread equally among all cleanup sites within an affected federal agency. That fair share approach would be altered only if the federal agency reached agreement with states that a funding cutback could be absorbed at selected sites without affecting any cleanup milestone.

  8. Toxic Substances Control Act Uranium Enrichment Federal Facility...

    Office of Environmental Management (EM)

    Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance Agreement Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance Agreement Toxic...

  9. Executive Order 12088: Federal Compliance with Pollution Control...

    Energy Savers [EERE]

    088: Federal Compliance with Pollution Control Standards Executive Order 12088: Federal Compliance with Pollution Control Standards The head of each Executive agency is responsible...

  10. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

  11. Meetings of the Federal Utility Partnership Working Group

    Broader source: Energy.gov [DOE]

    The Federal Utility Partnership Working Group (FUPWG) meets twice per year to share success stories, information on Federal Energy Management Program activities and other business.

  12. Chronological History of Federal Energy-Efficient Product Procurement...

    Broader source: Energy.gov (indexed) [DOE]

    Chronological History of Federal Energy-Efficient Product Procurement: Executive, Legislative and Regulatory Requirements, Actions and Mandates Chronological History of Federal...

  13. Energy-Efficient Product Procurement for Federal Agencies | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Energy-Efficient Product Procurement for Federal Agencies Energy-Efficient Product Procurement for Federal Agencies Brochure details the overview of the U.S. Department of Energy...

  14. Expanded "Green Button" Will Reach Federal Agencies and More...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    "Green Button" Will Reach Federal Agencies and More American Energy Consumers Expanded "Green Button" Will Reach Federal Agencies and More American Energy Consumers December 6,...

  15. POLICY GUIDANCE MEMORANDUM #18 Advertisement of Federal Career...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Advertisement of Federal Career Intern Program Employment Opps (Expired) POLICY GUIDANCE MEMORANDUM 18 Advertisement of Federal Career Intern Program Employment Opps (Expired)...

  16. Cumulative Federal Payments to OE Recovery Act Recipients, through...

    Broader source: Energy.gov (indexed) [DOE]

    September 30, 2014 Cumulative Federal Payments to OE Recovery Act Recipients, through September 30, 2014 Cumulative Federal Payments to OE Recovery Act Recipients, through...

  17. Cumulative Federal Payments to OE Recovery Act Recipients, through...

    Broader source: Energy.gov (indexed) [DOE]

    3 Cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2013 Graph of cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2013. OE...

  18. Cumulative Federal Payments to OE Recovery Act Recipients, through...

    Broader source: Energy.gov (indexed) [DOE]

    4 Cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2014 Cumulative Federal Payments to OE Recovery Act Recipients, through June 30, 2014. OE ARRA...

  19. German Federal Ministry for the Environment, Nature Conservation...

    Open Energy Info (EERE)

    Federal Ministry for the Environment, Nature Conservation and Nuclear Safety Jump to: navigation, search Logo: German Federal Ministry for the Environment, Nature Conservation and...

  20. 2013 Federal Energy and Water Management Award Winner Sandrine...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sandrine Schultz 2013 Federal Energy and Water Management Award Winner Sandrine Schultz fewm13schultzhighres.pdf fewm13schultz.pdf More Documents & Publications 2013 Federal...