National Library of Energy BETA

Sample records for federal floorspace starting

  1. Federal Buildings Supplemental Survey 1993

    U.S. Energy Information Administration (EIA) Indexed Site

    4. Energy Conservation Features in FBSS Building in Federal Region 3, Number of Buildings and Floorspace, 1993 Total Floorspace Number of Buildings (thousand square feet) Any Any...

  2. Floorspace

    U.S. Energy Information Administration (EIA) Indexed Site

    .........",4.6,4.7,4.9,4.8,5.1,4.6,5 "High Intensity Discharge .....",4.8,4.9,5.3,4.4,5.2,4.8.........",3.8,3.8,4.1,3.7,3.6,3.7,3.7 "Energy Management and" " Control System (EMCS) ...

  3. Floorspace

    U.S. Energy Information Administration (EIA) Indexed Site

    "Principal Building Activity" "Education ......",386,9874,25.6,7 ... "Principal Building Activity" "Education ......",7.1,6,5.4,"" ...

  4. Level: National Data; Row: NAICS Codes; Column: Floorspace and Buildings;

    U.S. Energy Information Administration (EIA) Indexed Site

    9.1 Enclosed Floorspace and Number of Establishment Buildings, 2010; Level: National Data; Row: NAICS Codes; Column: Floorspace and Buildings; Unit: Floorspace Square Footage and Building Counts. Approximate Approximate Average Enclosed Floorspace Average Number Number of All Buildings Enclosed Floorspace of All Buildings of Buildings Onsite NAICS Onsite Establishments(b) per Establishment Onsite per Establishment Code(a) Subsector and Industry (million sq ft) (counts) (sq ft) (counts) (counts)

  5. Table B28. Percent of Floorspace Heated, Number of Buildings and Floorspace, 199

    U.S. Energy Information Administration (EIA) Indexed Site

    8. Percent of Floorspace Heated, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","Not Heated","1 to 50 Percent Heated","51 to 99 Percent Heated","100 Percent Heated","All Buildings","Not Heated","1 to 50 Percent Heated","51 to 99 Percent Heated","100 Percent Heated" "All

  6. Table B29. Percent of Floorspace Cooled, Number of Buildings and Floorspace, 199

    U.S. Energy Information Administration (EIA) Indexed Site

    9. Percent of Floorspace Cooled, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","Not Cooled","1 to 50 Percent Cooled","51 to 99 Percent Cooled","100 Percent Cooled","All Buildings","Not Cooled","1 to 50 Percent Cooled","51 to 99 Percent Cooled","100 Percent Cooled" "All

  7. Table B15. Number of Establishments in Building, Floorspace, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    5. Number of Establishments in Building, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","Number of Establishments in Building" ,,"One","Two to Five","Six to Ten","Eleven to Twenty","More than Twenty","Currently Unoccupied" "All Buildings ................",67338,43343,10582,3574,3260,4811,1769 "Building Floorspace" "(Square Feet)" "1,001

  8. Table B1. Summary Table: Totals and Means of Floorspace, Number of Workers, and

    U.S. Energy Information Administration (EIA) Indexed Site

    . Summary Table: Totals and Means of Floorspace, Number of Workers, and Hours of Operation, 1999" ,"All Buildings (thousand)","Total Floorspace (million square feet)","Total Workers in All Buildings (thousand)","Mean Square Feet per Building (thousand)","Mean Square Feet per Worker","Mean Hours per Week" "All Buildings ................",4657,67338,81852,14.5,823,60 "Building Floorspace" "(Square Feet)"

  9. Table B30. Percent of Floorspace Lit When Open, Number of Buildings and Floorspa

    U.S. Energy Information Administration (EIA) Indexed Site

    0. Percent of Floorspace Lit When Open, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","Not Lita","1 to 50 Percent Lit","51 to 99 Percent Lit","100 Percent Lit","All Buildings","Not Lita","1 to 50 Percent Lit","51 to 99 Percent Lit","100 Percent Lit" "All Buildings

  10. "Table B11. Employment Size Category, Floorspace, 1999"

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Employment Size Category, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","Number of Workers" ,,"Fewer than 5 Workers","5 to 9 Workers","10 to 19 Workers","20 to 49 Workers","50 to 99 Workers","100 to 249 Workers","250 or More Workers" "All Buildings ................",67338,14321,6325,8028,10814,8898,8356,10595 "Building Floorspace"

  11. "Table B23. Primary Space-Heating Energy Sources, Floorspace, 1999"

    U.S. Energy Information Administration (EIA) Indexed Site

    3. Primary Space-Heating Energy Sources, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Space Heating","Primary Space-Heating Energy Source Useda" ,,,"Electricity","Natural Gas","Fuel Oil","District Heat" "All Buildings ................",67338,61602,17627,32729,3719,5077 "Building Floorspace" "(Square Feet)" "1,001 to 5,000

  12. "Table B25. Energy End Uses, Floorspace for Non-Mall Buildings, 2003"

    U.S. Energy Information Administration (EIA) Indexed Site

    5. Energy End Uses, Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"All Buildings*","Energy Used For (more than one may apply)" ,,"Space Heating","Cooling","Water Heating","Cooking","Manu- facturing" "All Buildings* ...............",64783,60028,56940,56478,22237,3138 "Building Floorspace" "(Square Feet)" "1,001 to 5,000

  13. "Table B26. Water-Heating Energy Sources, Floorspace, 1999"

    U.S. Energy Information Administration (EIA) Indexed Site

    6. Water-Heating Energy Sources, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Water Heating","Water-Heating Energy Sources Used (more than one may apply)" ,,,"Electricity","Natural Gas","Fuel Oil","District Heat","Propane" "All Buildings ................",67338,56115,24171,29196,2218,4182,1371 "Building Floorspace" "(Square

  14. Table B16. Multibuilding Facilities, Number of Buildings and Floorspace, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    6. Multibuilding Facilities, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,"Total Floorspace (million square feet)" ,"All Buildings","Buildings on Multibuilding Facilities",,"All Buildings","Buildings on Multibuilding Facilities" ,,"All Buildings","With Central Physical Plant",,"All Buildings","With Central Physical Plant" "All Buildings

  15. Table B19. Energy End Uses, Number of Buildings and Floorspace, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    9. Energy End Uses, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,,"Total Floorspace (million square feet)" ,"All Buildings","Energy Used For (more than one may apply)",,,,,"All Buildings","Energy Used For (more than one may apply)" ,,"Space Heating","Cooling","Water Heating","Cooking","Manufact-uring",,"Space

  16. Table B2. Summary Table: Totals and Medians of Floorspace, Number of Workers,

    U.S. Energy Information Administration (EIA) Indexed Site

    . Summary Table: Totals and Medians of Floorspace, Number of Workers, Hours of Operation, and Age of Building, 1999" ,"All Buildings (thousand)","Total Floorspace (million square feet)","Total Workers in All Buildings (thousand)","Median Square Feet per Building (thousand)","Median Square Feet per Worker","Median Hours per Week","Median Age of Buildings (years)" "All Buildings

  17. Table B27. Cooking Energy Sources, Number of Buildings and Floorspace, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    7. Cooking Energy Sources, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Cooking","Cooking Energy Sources (more than one may apply)",,,"All Buildings","All Buildings with Cooking","Cooking Energy Sources (more than one may apply)" ,,,"Electricity","Natural

  18. Table B24. Cooling Energy Sources, Number of Buildings and Floorspace, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    4. Cooling Energy Sources, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Cooling","Cooling Energy Sources (more than one may apply)",,,"All Buildings","All Buildings with Cooling","Cooling Energy Sources (more than one may apply)" ,,,"Electricity","Natural Gas","District

  19. Table B3. Census Region, Number of Buildings and Floorspace, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    . Census Region, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","North- east","Midwest ","South","West","All Buildings","North- east","Midwest","South","West" "All Buildings ................",4657,686,1188,1762,1021,67338,12360,16761,23485,14731 "Building

  20. Table B36. Refrigeration Equipment, Number of Buildings and Floorspace, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    6. Refrigeration Equipment, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Refrigeration Equipment","Type of Equipment (more than one may apply)",,,"All Buildings","All Buildings with Refrigeration Equipment","Type of Equipment (more than one may apply)" ,,,"Walk-In","Open Cases or

  1. Table B37. Water Heating Equipment, Number of Buildings and Floorspace, 1999

    U.S. Energy Information Administration (EIA) Indexed Site

    7. Water Heating Equipment, Number of Buildings and Floorspace, 1999" ,"Number of Buildings (thousand)",,,,,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Water Heating","Type of Water Heating Equipment",,,"All Buildings","All Buildings with Water Heating","Type of Water Heating Equipment" ,,,"Central-ized System","Distri-buted System","Combination

  2. Table HC1.2.2 Living Space Characteristics by Average Floorspace

    U.S. Energy Information Administration (EIA) Indexed Site

    2 Living Space Characteristics by Average Floorspace, " " Per Housing Unit and Per Household Member, 2005" ,,"Average Square Feet" ," Housing Units (millions)" ,,"Per Housing Unit",,,"Per Household Member" "Living Space Characteristics",,"Total1","Heated","Cooled","Total1","Heated","Cooled" "Total",111.1,2033,1618,1031,791,630,401 "Total Floorspace (Square

  3. "Table B16. Employment Size Category, Floorspace for Non-Mall Buildings, 2003"

    U.S. Energy Information Administration (EIA) Indexed Site

    6. Employment Size Category, Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"All Buildings*","Number of Workers" ,,"Fewer than 5 Workers","5 to 9 Workers","10 to 19 Workers","20 to 49 Workers","50 to 99 Workers","100 to 249 Workers","250 or More Workers" "All Buildings* ...............",64783,15492,6166,7803,10989,7934,6871,9528 "Building

  4. "Table B21. Space-Heating Energy Sources, Floorspace, 1999"

    U.S. Energy Information Administration (EIA) Indexed Site

    1. Space-Heating Energy Sources, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","All Buildings with Space Heating","Space-Heating Energy Sources Used (more than one may apply)" ,,,"Electricity","Natural Gas","Fuel Oil","District Heat","Propane","Othera" "All Buildings ................",67338,61612,32291,37902,5611,5534,2728,945 "Building

  5. "Table B29. Primary Space-Heating Energy Sources, Total Floorspace for Non-Mall Buildings, 2003"

    U.S. Energy Information Administration (EIA) Indexed Site

    9. Primary Space-Heating Energy Sources, Total Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"All Buildings*","Buildings with Space Heating","Primary Space-Heating Energy Source Used a" ,,,"Electricity","Natural Gas","Fuel Oil","District Heat" "All Buildings* ...............",64783,60028,15996,32970,3818,4907 "Building Floorspace" "(Square

  6. "Table HC1.1.3 Housing Unit Characteristics by Average Floorspace--"

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Housing Unit Characteristics by Average Floorspace--" " Single-Family Housing Units and Mobile Homes, 2005" ,,"Single- Family and Mobile Homes (millions)","Average Square Feet per Housing Unit-- Single-Family and Mobile Homes" ," Housing Units (millions)" ,,,"Single-Family Detached",,,"Single-Family Attached",,,"Mobile Homes" "Housing Unit

  7. "Table HC1.2.3 Living Space Characteristics by Average Floorspace--"

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Living Space Characteristics by Average Floorspace--" " Single-Family Housing Units and Mobile Homes, 2005" ,,"Single- Family and Mobile Homes (millions)","Average Square Feet per Housing Unit" ," Housing Units (millions)" ,,,"Single-Family Detached",,,"Single-Family Attached",,,"Mobile Homes" "Housing Unit

  8. Table HC1.1.2 Housing Unit Characteristics by Average Floorspace, 2005

    U.S. Energy Information Administration (EIA) Indexed Site

    2 Housing Unit Characteristics by Average Floorspace, 2005 " ,,"Average Square Feet per--" ," Housing Units (millions)" ,,"Housing Unit",,,"Household Member" "Housing Unit Characteristics",,"Total1","Heated","Cooled","Total","Heated","Cooled" "Total",111.1,2171,1618,1031,845,630,401 "Census Region and Division" "Northeast",20.6,2334,1664,562,911,649,220

  9. Table HC1.1.4 Housing Unit Characteristics by Average Floorspace--Apartments, 2

    U.S. Energy Information Administration (EIA) Indexed Site

    4 Housing Unit Characteristics by Average Floorspace--Apartments, 2005" ,,,"Average Square Feet per Apartment in a --" ," Housing Units (millions)" ,,,"2 to 4 Unit Building",,,"5 or More Unit Building" ,,"Apartments (millions)" "Housing Unit Characteristics",,,"Total","Heated","Cooled","Total","Heated","Cooled" "Total",111.1,24.5,1090,902,341,872,780,441

  10. Table HC1.2.4 Living Space Characteristics by Average Floorspace--Apartments, 2

    U.S. Energy Information Administration (EIA) Indexed Site

    2.4 Living Space Characteristics by Average Floorspace--Apartments, 2005" ,,,"Average Square Feet per Apartment in a --" ," Housing Units (millions)" ,,,"2 to 4 Unit Building",,,"5 or More Unit Building" ,,"Apartments (millions)" "Living Space Characteristics",,,"Total","Heated","Cooled","Total","Heated","Cooled" "Total",111.1,24.5,1090,902,341,872,780,441

  11. "Table B27. Space Heating Energy Sources, Floorspace for Non-Mall Buildings, 2003"

    U.S. Energy Information Administration (EIA) Indexed Site

    7. Space Heating Energy Sources, Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"All Buildings*","Buildings with Space Heating","Space-Heating Energy Sources Used (more than one may apply)" ,,,"Elec- tricity","Natural Gas","Fuel Oil","District Heat","Propane","Other a" "All Buildings* ...............",64783,60028,28600,36959,5988,5198,3204,842

  12. "Table B32. Water-Heating Energy Sources, Floorspace for Non-Mall Buildings, 2003"

    U.S. Energy Information Administration (EIA) Indexed Site

    2. Water-Heating Energy Sources, Floorspace for Non-Mall Buildings, 2003" ,"Total Floorspace (million square feet)" ,"All Buildings*","Buildings with Water Heating","Water-Heating Energy Sources Used (more than one may apply)" ,,,"Elec- tricity","Natural Gas","Fuel Oil","District Heat","Propane" "All Buildings* ...............",64783,56478,27490,28820,1880,3088,1422 "Building

  13. Alaska START

    Broader source: Energy.gov [DOE]

    The DOE Office of Indian Energy’s Alaska Strategic Technical Assistance Response Team (START) Program assists Alaska Native corporations and federally recognized Alaska Native governments with accelerating clean energy projects.

  14. "Table HC1.3 Heated Floorspace Usage Indicators, 2005" " Million U.S. Housing Units"

    U.S. Energy Information Administration (EIA) Indexed Site

    3 Heated Floorspace Usage Indicators, 2005" " Million U.S. Housing Units" ,,"Heated Floorspace (square feet)" ,"Housing Units (millions)" ,,"Fewer than 500","500 to 999","1,000 to 1,499","1,500 to 1,999","2,000 to 2,499","2,500 to 2,999","3,000 or More" "Usage Indicators" "Total",111.1,6.1,27.7,26,17.6,10,"7 7.8",11.6 "No Main Space Heating

  15. "Table HC1.4 Cooled Floorspace Usage Indicators, 2005" " Million U.S. Housing Units"

    U.S. Energy Information Administration (EIA) Indexed Site

    4 Cooled Floorspace Usage Indicators, 2005" " Million U.S. Housing Units" ,,"Cooled Floorspace (square feet)" ,"Housing Units (millions)" ,,"Fewer than 500","500 to 999","1,000 to 1,499","1,500 to 1,999","2,000 to 2,499","2,500 to 2,999","3,000 or More" "Usage Indicators" "Total",111.1,49.2,15.1,15.6,11.1,7,5.2,8 "Have Cooling

  16. START Program

    Broader source: Energy.gov [DOE]

    The Strategic Technical Assistance Response Team (START) Program is part of the DOE Office of Indian Energy effort to assist in the development of tribal renewable energy projects. Through START, Tribes in the 48 contiguous states and Alaska can apply for and are selected to receive technical assistance from DOE and national laboratory experts to move projects closer to implementation.

  17. Hybrid: Starting

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    button highlighted Cruising Button Passing Button Braking Button Stopped Button subbanner graphic: gray bar STARTING When the vehicle is started, the gasoline engine "warms up." If necessary, the electric motor acts as a generator, converting energy from the engine into electricity and storing it in the battery. stage graphic: vertical blue rule Main stage: See through car with battery, engine, and electric motor visible. The car is moving. There are arrows flowing from the gasoline

  18. Getting Started

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Started Getting Started Before you can use or access Cori, you must have an active NERSC account and valid password. If you don't, see Accounts and Allocations. Cori should be used in the following way: Log in to a "login" node, bring your files and data over, compile your code, and create a batch submission script. Then submit that script so that your application runs on the Cori "compute" nodes. Pay attention to the various file systems available and the choices in

  19. Getting Started

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Getting Started Getting Started Logging in In order to follow this page, you will need an account, a username and a password. If you do not have all of these things please visit the Accounts Page. Users can log into the Carver system using the Secure Shell (SSH) protocol 2 with the following command: mydesktop% ssh -l username carver.nersc.gov When you successfully log in you will land in your $HOME directory. There are typically four login nodes available on Carver. The hostname

  20. Getting Started

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Started Getting Started Before you can use or access Franklin, you must have an active NERSC account and valid password. If you don't, follow the "Accounts and Allocations" link in "See Also" at right. Logging in to Franklin A UNIX/Linux SSH or an SSH-enabled client is required to log in to Franklin. Read More » Your First Program What you need to know to run your first program on the Franklin system. This page will step you through logging in, compiling a simple test code,

  1. Getting Started

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Started Getting Started Before you can use or access Hopper, you must have an active NERSC account and valid password. If you don't, follow the "Accounts and Allocations" link in "See Also" at right. Hopper should be used in the following way: Log in to a "login" node, bring your files and data over, compile your code, and create a batch submission script. Then submit that script so that your application runs on the Hopper "compute" nodes. Pay attention to

  2. Getting started

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Getting started Getting started First Steps You can log in to Genepool using SSH (Secure Shell) with the following command from any UNIX, Linux, FreeBSD, etc. command shell or terminal: ssh -l username genepool.nersc.gov There are several SSH-capable clients available for Windows, Mac, and UNIX/Linux machines. NERSC does not support or recommend any particular client. By ssh'ing to genepool.nersc.gov, you will access one of the seven genepool login nodes. These login nodes are situated behind a

  3. Getting started

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Getting started Getting started Logging In Users can log into Euclid using the Secure Shell (SSH) protocol 2 with the following command: % ssh -l username euclid.nersc.gov When you successfully log in you will land in your $HOME directory. Euclid is a one node system. All jobs that run on Euclid, e.g. compiles, edits, user jobs, etc,. run on the same node. Sample Program Code: Parallel Hello World Although Euclid was not intended for production runs of MPI codes, it is possible to run small MPI

  4. Getting Started

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status 1-800-66-NERSC, option 1 or 510-486-6821 Account Support https://nim.nersc.gov accounts@nersc.gov 1-800-66-NERSC, option 2 or 510-486-8612 Consulting http://help.nersc.gov consult@nersc.gov 1-800-66-NERSC, option 3 or 510-486-8611 Home » For Users » Getting Started Getting Started Welcome to NERSC Welcome to the National Energy Research Scientific Computing Center, a high performance scientific

  5. "Table A7. Enclosed Floorspace and Conditioned Floorspace...

    U.S. Energy Information Administration (EIA) Indexed Site

    ... 3321," Gray and Ductile Iron Foundries",61.2,517,122.7,30.5,49.8,4.2 3331," Primary Copper",8.8,20,469.2,1.2,13.5,0.9 3334," Primary Aluminum",31.8,44,944.4,4.1,12.9,1.6 3339," ...

  6. Alaska START Application

    Broader source: Energy.gov [DOE]

    Download the application for the START Program for Community Energy Planning and Projects–Round Three.

  7. Getting Started on Edison

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Started Getting Started on Edison Before you can use or access Edison, you must have an active NERSC account and valid password. If you don't, see Accounts and Allocations. Edison...

  8. Daylight Savings Time Starts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Daylight Savings Time Starts Daylight Savings Time Starts WHEN: Mar 08, 2015 3:00 AM - 11:59 PM WHERE: World Time Zones CATEGORY: Holiday INTERNAL: Calendar Login Daylight Savings...

  9. START Program Project Sites

    Broader source: Energy.gov [DOE]

    The Strategic Technical Assistance Response Team (START) Program is part of the DOE Office of Indian Energy effort to assist in the development of tribal renewable energy projects. Through START,...

  10. START Program: Alaska

    Office of Energy Efficiency and Renewable Energy (EERE)

    Overview fact sheet on the selected DOE Office of Indian Energy Strategic Technical Assistance Response Team (START) projects in Alaska.

  11. Getting Started - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Site Voluntary Protection Program Getting Started Hanford Site Voluntary Protection Program VPP Home VPP Hanford Site Champions Committee Getting Started Maintaining STAR VPP Communications VPP Conferences Getting Started Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size History of VPP (PDF) VPP How To Guide (PDF) VPP Getting Started Tools Employee Pocket Guide (PDF) What is a Personal Safety Action Plan (PDF) Picture This (PDF) VPP Tenets Tenet 1 (PDF)

  12. Buildings Energy Data Book: 4.3 Federal Buildings and Facilities Expenditures

    Buildings Energy Data Book [EERE]

    2 Annual Energy Expenditures per Gross Square Foot of Federal Floorspace Stock, by Year ($2010) FY 1985 2.13 FY 2000 1.36 FY 2001 1.58 FY 2002 1.49 FY 2003 1.45 FY 2004 1.54 FY 2005 1.59 FY 2006 2.01 (1) FY 2007 2.01 Note(s): Source(s): Total Federal buildings and facilities energy expenditures in FY 2006 were $5.79 billion (in $2010). 1) Increase due to change in FEMP categorization of Federal buildings. DOE/FEMP, Annual Report to Congress on FEMP FY 2007, Jan. 2010, Table A-9, p. 97 and Table

  13. Stop/Start: Overview

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    highlighted Driving button Braking button subbanner graphic: gray bar OVERVIEW Stop/Start hybrids are not true hybrids since electricity from the battery is not used to propel the vehicle. However, the Stop/Start feature is an important, energy-saving building block used in hybrid vehicles. Stop/Start technology conserves energy by shutting off the gasoline engine when the vehicle is at rest, such as at a traffic light, and automatically re-starting it when the driver pushes the gas pedal to go

  14. Blank Starting Slide

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rewind Generator Rewind Denison Powerhouse Denison Rewind Rewind Contract - Awarded to Alstom May 2004 - 4.56 million - 526 calendar days Denison Rewind Original Schedule - Start...

  15. START Program 2013: Alaska

    Broader source: Energy.gov [DOE]

    The Strategic Technical Assistance Response Team (START) Program is part of the DOE's Office of Indian Energy Policy and Programs effort to assist in the development of tribal renewable energy projects. Through START, Tribes in the 48 contiguous states and Alaska can apply for and are selected to receive technical assistance from DOE and national laboratory experts to move projects closer to implementation.

  16. Getting Started at NERSC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC Training Event 10:00 - 12:00 PDT September 13, 2011 Concurrently presented on the web and at NERSC's Oakland Scientific Facility Getting Started at NERSC For New NERSC...

  17. Getting Started at NERSC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    gerbyao NERSC Training Event 10:00 - 12:00 PDT June 7, 2011 Concurrently presented on the web and at NERSC's Oakland Scientific Facility Getting Started at NERSC For New NERSC...

  18. Getting Started at NERSC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC Training Webinar 10:00 - 12:00 PST January 17, 2013 Presented as a Web Event only Getting Started at NERSC For New NERSC Users Richard Gerber, NERSC User...

  19. Full Hybrid: Starting

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    is larger and holds much more energy than batteries used to start conventional vehicles. ... the gasoline engine to charge the batteries or provide power to the wheels as needed. ...

  20. Buildings Energy Data Book: 4.2 Federal Buildings and Facilities Characteristics

    Buildings Energy Data Book [EERE]

    2 Federal Buildings and Facilities Characteristics March 2012 4.2.1 Federal Building Gross Floorspace, by Year and Agency Fiscal Year Agency FY 1985 3.37 DOD 63% FY 1986 3.38 USPS 10% FY 1987 3.40 GSA 6% FY 1988 3.23 VA 5% FY 1989 3.30 DOE 3% FY 1990 3.40 Other 13% FY 1991 3.21 Total 100% FY 1992 3.20 FY 1993 3.20 FY 1994 3.11 FY 1995 3.04 FY 1996 3.03 FY 1997 3.02 FY 1998 3.07 FY 1999 3.07 FY 2000 3.06 FY 2001 3.07 FY 2002 3.03 FY 2003 3.04 FY 2004 2.97 FY 2005 2.96 FY 2006 3.10 FY 2007 3.01

  1. Creating an Energy Awareness Campaign: A Handbook for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Management Program handbook describes how federal energy manager can start and manage an energy awareness campaign to reduce energy, water, and fuel consumption in ...

  2. Federal Register

    Energy Savers [EERE]

    Federal Long Tern Care Insurance Program (FLTCIP) Federal Long Tern Care Insurance Program (FLTCIP) The Federal Long Term Care Insurance Program (FLTCIP) provides long term care insurance to help pay for costs of care when enrollees need help with activities they perform every day, or you have a severe cognitive impairment, such as Alzheimer's disease. Most Federal employees and annuitants, active and retired members of the uniformed services, and their qualified relatives are eligible to apply

  3. Federal Energy Management Program (FEMP)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SMALL BUSINESS PROGRAM The Federal Energy Management Program (FEMP) is a U.S. Department of Energy (DOE) program focused on reducing the federal government's energy consumption by providing federal agencies with information, tools, and assistance toward tracking and meeting energy- related requirements and goals. FEMP seeks contracts with small businesses to aid in this effort. This fact sheet outlines essential resources and tips to get you started in small business contracting with FEMP.

  4. Starting of turbine engines

    SciTech Connect (OSTI)

    Shekleton, J.R.

    1990-05-01

    This patent describes a relatively small turbine engine. It comprises: a rotary turbine wheel; a rotary compressor coupled to the turbine wheel; an annular combustor for receiving air from the compressor and fuel from a fuel source combusting the same and providing gases of combustion to the turbine wheel to drive the same; substantially identical main fuel injectors including fuel injecting nozzles angularly spaced about the compressor; fuel and air from the compressor being introduced into the combustor generally in the tangential direction; a fuel pump; a control schedule valve; and first and second main fuel solenoid valves. The first valve being operable to connect a minority of the injectors to the control schedule valve and the fuel pump for starting the engine, there being an even number of the injectors and the minority of injectors consisting of two diametrically opposite injectors; the first and second valves being operable to connect all of the injectors to the control schedule valve and the pump for causing normal operation of the engine; the engine further being characterized by the absence of start fuel injectors for the combustor.

  5. Buildings Energy Data Book: 4.1 Federal Buildings Energy Consumption

    Buildings Energy Data Book [EERE]

    2 FY 2007 Federal Building Energy Use Shares, by Fuel Type and Agency Site Primary | Primary | FY 2007 Fuel Type Percent Percent | Agency Percent | (10^15 Btu) Electricity 49.4% 77.3% | DOD 53.8% | Total Delivered Natural Gas 33.5% 14.9% | USPS 9.8% | Energy Consumption = 0.39 Fuel Oil 7.3% 3.3% | DOE 8.2% | Total Primary Coal 5.2% 2.3% | VA 6.4% | Energy Consumption = 0.88 Other 4.9% 2.2% | GSA 5.1% | Total 100% 100% | Other 16.8% | Total 100% Note(s): Source(s): See Table 2.3.1 for floorspace.

  6. Federal Energy Management Laws and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Laws and Requirements Federal Energy Management Laws and Requirements Federal Energy Management Laws and Requirements To help agencies comply with federal laws and requirements, the Federal Energy Management Program (FEMP) analyzes energy management mandates from legal authorities and publishes notices and rules related to federal energy management. FEMP also provides tools to help agencies report annual facility and fleet progress toward federal laws and requirements. Get Started Start meeting

  7. Strengthening Federal

    Energy Savers [EERE]

    Jan. 24 / Administration of George W. Bush, 2007 Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management January 24, 2007 By the authority vested in me as President by the Constitution and the laws of the United States of America, and to strengthen the environmental, energy, and transpor- tation management of Federal agencies, it is hereby ordered as follows: Section 1. Policy. It is the policy of the United States that Federal agencies conduct their

  8. Federal Sector

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News & Events Skip navigation links Residential Commercial Industrial Federal Agriculture About five percent of BPA's total electric supply goes to power facilities around...

  9. Federal Biomass Activities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Budget Federal Biomass Activities Federal Biomass Activities Biopower Biopower Biofuels Biofuels Bioproducts Bioproducts Federal Biomass Activities Federal Biomass Activities ...

  10. START Signed | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    NNSA Timeline START Signed START Signed July 31, 1991 START Signed Russia Moscow, USSR President Bush signs the Strategic Arms Reduction Treaty (START), which will reduce...

  11. Getting Started and Optimization Strategy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Getting Started and Optimization Strategy Getting Started and Optimization Strategy The purpose of this page is to get you started thinking about how to optimize your application for the Knights Landing (KNL) Architecture that will be on Cori. This page will walk you through the high level steps and give an example using a real application that runs at NERSC. How Does Cori Differ From Edison There are several important differences between the Cori (Knights-Landing) node architecture and the

  12. START Team | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Team START Team The U.S. Department of Energy (DOE) Office of Indian Energy Strategic Technical Assistance Response Team (START) Program assists in the development of tribal renewable energy projects. Learn about the START team members from DOE and the National Renewable Energy Laboratory (NREL) below. Sarai Geary Program Manager, 48 Contiguous States Sarai Geary (Muscogee Creek Nation) is a program manager in the Office of Indian Energy. As program manager, Ms. Geary designs and implements

  13. PSNH- Municipal Smart Start Program

    Broader source: Energy.gov [DOE]

    Public Service of New Hampshire (PSNH), an electric utility, offers the Smart Start Program to Municipal customers. This program assists municipalities in reducing energy consumption and electric...

  14. Eversource- Municipal Smart Start Program

    Broader source: Energy.gov [DOE]

    Eversource (previously Public Service of New Hampshire), an electric utility, offers the Smart Start Program to municipal customers. This program assists municipalities in reducing energy...

  15. START Program: 48 Contiguous States

    Broader source: Energy.gov [DOE]

    Overview fact sheet on the selected DOE Office of Indian Energy Strategic Technical Assistance Response Team (START) projects in the 48 contiguous states.

  16. Start Your Energy Conversion Devices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | Department of Energy Start 2015 with an #EnergyResolution to Save Money and Energy All Year Long Start 2015 with an #EnergyResolution to Save Money and Energy All Year Long January 19, 2015 - 9:52am Addthis Create an #EnergyResolution to share how you plan to save money and energy in the New Year. | Graphic courtesy of Joelynn Schroeder, National Renewable Energy Laboratory Create an #EnergyResolution to share how you plan to save money and energy in the New Year. | Graphic courtesy of

  17. Impulsively started incompressible turbulent jet

    SciTech Connect (OSTI)

    Witze, P O

    1980-10-01

    Hot-film anemometer measurements are presented for the centerline velocity of a suddenly started jet of air. The tip penetration of the jet is shown to be proportional to the square-root of time. A theoretical model is developed that assumes the transient jet can be characterized as a spherical vortex interacting with a steady-state jet. The model demonstrates that the ratio of nozzle radius to jet velocity defines a time constant that uniquely characterizes the behavior and similarity of impulsively started incompressible turbulent jets.

  18. Federal Financial Report

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    REPORT (Follow form instructions) 1. Federal Agency and Organizational Element 2. Federal Grant or Other Identifying Number Assigned by Federal Agency Page of to Which Report is ...

  19. Getting Started | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Getting Started By completing the following steps, you can ensure your small business is prepared to respond to contracting opportunities from Argonne: View what Argonne is buying to determine whether there is a need for your particular product or service. Determine whether your company is a small business. Check the North American Industrial Classification System (NAICS) codes for your industry and the related size standard and gross revenue standards. Obtain the appropriate certifications to

  20. Starting apparatus for internal combustion engines

    DOE Patents [OSTI]

    Dyches, G.M.; Dudar, A.M.

    1995-01-01

    This report is a patent description for a system to start an internal combustion engine. Remote starting and starting by hearing impaired persons are addressed. The system monitors the amount of current being drawn by the starter motor to determine when the engine is started. When the engine is started the system automatically deactivates the starter motor. Five figures are included.

  1. 2005 Getting Started with Epics Videos

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Video Library APS Colloquium Videos * 2007 * 2006 * 2005 * 2004 Getting Started with Epics * 2005 * 2004 2005 Getting Started with Epics Videos ASD Controls and AOD BCDA have...

  2. Rapid starting methanol reactor system

    DOE Patents [OSTI]

    Chludzinski, Paul J.; Dantowitz, Philip; McElroy, James F.

    1984-01-01

    The invention relates to a methanol-to-hydrogen cracking reactor for use with a fuel cell vehicular power plant. The system is particularly designed for rapid start-up of the catalytic methanol cracking reactor after an extended shut-down period, i.e., after the vehicular fuel cell power plant has been inoperative overnight. Rapid system start-up is accomplished by a combination of direct and indirect heating of the cracking catalyst. Initially, liquid methanol is burned with a stoichiometric or slightly lean air mixture in the combustion chamber of the reactor assembly. The hot combustion gas travels down a flue gas chamber in heat exchange relationship with the catalytic cracking chamber transferring heat across the catalyst chamber wall to heat the catalyst indirectly. The combustion gas is then diverted back through the catalyst bed to heat the catalyst pellets directly. When the cracking reactor temperature reaches operating temperature, methanol combustion is stopped and a hot gas valve is switched to route the flue gas overboard, with methanol being fed directly to the catalytic cracking reactor. Thereafter, the burner operates on excess hydrogen from the fuel cells.

  3. Eastman, AP start on coal unit

    SciTech Connect (OSTI)

    1995-10-25

    Eastman Chemical and Air Products and Chemicals (AP) have started construction of a $214-million, coal-to-methanol demonstration unit at Eastmans site in Kingsport, TN. The project is part of the Department of Energy`s clean coal technology program and is receiving $93 million in federal support. The demonstration unit-which will have a methanol capacity of 260 tons/day-will use novel catalyst technology for converting coal-derived synthesis gas (syngas) to methanol. Unlike conventional technology that processes syngas through a fixed bed of dry catalyst particles, the liquid-phase methanol process converts the syngas in a single vessel containing catalysts suspended in mineral oil. The companies say the innovation allows the process to better able handle the gases from coal gasifiers and is more stable and reliable than existing processes. Eastman says it will use the methanol produced by the plant as a chemical feedstock. It currently uses methanol as an intermediate in making acetic anhydride and dimethyl terephthalate. In addition, the companies say the methanol will be evaluated as a feedstock in making methyl tert-butyl ether for reformulated fuels. Eastman also says it will evaluate coproducing dimethyl ether (DME) with the methanol. DME can be used as a fuel additive or blended with methanol for a chemical feedstock, according to Eastman.

  4. Creating an Energy Awareness Campaign: A Handbook for Federal Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Managers | Department of Energy Creating an Energy Awareness Campaign: A Handbook for Federal Energy Managers Creating an Energy Awareness Campaign: A Handbook for Federal Energy Managers Federal Energy Management Program handbook describes how federal energy manager can start and manage an energy awareness campaign to reduce energy, water, and fuel consumption in agencies. PDF icon Download the handbook. More Documents & Publications 2001 FEMP Customer Survey Report (Appendices)

  5. Coordination of Federal Transmission Permitting on Federal Lands...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, ...

  6. Property:StartDate | Open Energy Information

    Open Energy Info (EERE)

    StartDate Jump to: navigation, search This is a property of type Date. Pages using the property "StartDate" Showing 25 pages using this property. (previous 25) (next 25) 4 4-County...

  7. FEMP Best Practices and Lessons Learned for Federal Agency ESPC...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2. GENERAL BEST PRACTICES 2.1 Teamwork is critical to ESPC success. 2.1.1 Designate a ... Use FEMP ESPC experts and training to your best advantage. 2.2.1 Start with a FEMP Federal ...

  8. Combined Federal Campaign | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Combined Federal Campaign

  9. Federal Laboratory Consortium | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Federal Laboratory Consortium

  10. Federal Agency NEPA Procedures

    Broader source: Energy.gov [DOE]

    Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

  11. Federal Financial Report

    Broader source: Energy.gov [DOE]

    Federal Financial Report, as posted on the U.S. Department of Energy's Better Buildings Neighborhood Program website.

  12. Federal Employee Training Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-10-11

    This Manual provides detailed requirements to supplement DOE O 360.1B, FEDERAL EMPLOYEE TRAINING. The information in this Manual is intended to assist in improving Federal workforce performance under Department of Energy (DOE) managed Federal employee training. Cancels DOE M 360.1A-1. Canceled by DOE O 360.1C.

  13. Federal Employee Training Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-09-21

    This Manual provides detailed requirements to supplement DOE O 360.1A, Federal Employee Training, dated 9-21-99. The information in this Manual is intended to assist in improving Federal workforce performance under Department of Energy (DOE) managed Federal employee training. Canceled by DOE M 360.1-1B.

  14. Time to Start Getting Ready for Cori

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Time to Start Getting Ready for Cori Time to Start Getting Ready for Cori February 4, 2015 by Richard Gerber Cori is coming and it's time to start getting ready. Yes, NERSC's Intel Xeon Phi-based system is still more than a year away, but if you're not already thinking about how you're going to use it, you need to get started. That's because to get your codes to run well (or maybe at all) on NERSC's first "many-core" system it is going to take more than a simple recompile. It's no

  15. Starting Points | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Starting Points Kansas City Plant Related Web Pages Summary Kansas City Plant Home Page Kansas City Plant Contracts DOE Directives NNSA Policy System Kansas City Field Office ...

  16. START Alaska Historical Energy Usage Spreadsheet

    Broader source: Energy.gov [DOE]

    Communities applying for the DOE Office of Indian Energy Strategic Technical Assistance Response Team (START) Initiative for Community Energy Planning and Projects Round Two are asked to download...

  17. CleanStart | Open Energy Information

    Open Energy Info (EERE)

    search Name: CleanStart Place: McClellan, California Zip: CA 95652 Product: US Business Technology Incubator located in California. Coordinates: 38.668696, -121.394799...

  18. WestStart CALSTART | Open Energy Information

    Open Energy Info (EERE)

    California Zip: 91106 Product: String representation "WestStart-CALST ... nd create jobs." is too long. Coordinates: 29.690847, -95.196308 Show Map Loading map......

  19. Federated Testbed Circuits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Testbed Circuits Network R&D Overview Experimental Network Testbeds 100G SDN Testbed Dark Fiber Testbed Federated Testbed Circuits Test Circuit Service Performance (perfSONAR)...

  20. Federal Employee Health Services

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-10-18

    The order establishes requirements and responsibilities for occupational medical, employee assistance, and workers' compensation programs for Federal employees. Supersedes DOE O 341.1.

  1. Federal NEPA Contacts

    Broader source: Energy.gov [DOE]

    CEQ and most Federal agencies identify primary points of contact for NEPA compliance. Normally a senior environmental professional, environmental law attorney, or member of agency leadership, these...

  2. Award Number: Federal Non-Federal Federal Non-Federal Total

    Office of Environmental Management (EM)

    B - Budget Categories Catalog of Federal Domestic Assistance Number Grant Program Function or Activity Estimated Unobligated Funds e. Supplies i. Total Direct Charges (sum of...

  3. Lab school supply drive starts July 15

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab school supply drive starts July 15 Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:May 2016 all issues All Issues » submit Lab school supply drive starts July 15 Anyone can donate supplies through the Lab's Community Programs Office July 1, 2013 Del Norte Credit Union's Baxter Bear takes a moment to pose with some of the backpacks filled with school supplies that will help students start their school year off right Del Norte Credit

  4. Twitter Training for Small Business Federal Contractors

    Broader source: Energy.gov [DOE]

    Twitter can be used to raise brand awareness, share and obtain information on upcoming federal contract opportunities, to network with peers and government leaders, and to help build a reputation for expertise in your field. Put Twitter to work for you! If you are already on Twitter, just getting started on Twitter, or thinking of joining, you can get super ideas on how to make a positive impression, discover more opportunities, team with colleagues, and drive business growth.

  5. Introduction to Benchmarking: Starting a Benchmarking Plan

    Broader source: Energy.gov [DOE]

    Presentation for the Introduction to Benchmarking: Starting a Benchmarking Plan webinar, presented on February 21, 2013 as part of the U.S. Department of Energy's Technical Assistance Program (TAP).

  6. Starting Points | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Starting Points Kansas City Plant Related Web Pages Summary Kansas City Plant Home Page Kansas City Plant Contracts DOE Directives NNSA Policy System Kansas City Field Office (KCFO) Home Page List of Applicable Directives in the Current Contract

  7. Federal Technical Capability

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-11-19

    This directive defines requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Cancels DOE M 426.1-1A, Federal Technical Capability Manual.

  8. Federal Technical Capability Manual

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-05

    The Federal Technical Capability Manual provides the process for the recruitment, deployment, development, and retention of Federal personnel with the demonstrated technical capability to safely accomplish the Departments missions and responsibilities at defense nuclear facilities. Canceled by DOE M 426.1-1A. Does not cancel other directives.

  9. PHEV Engine Cold Start Emissions Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cold Start Emissions Management PHEV Engine Cold Start Emissions Management Coordination of engine and powertrain supervisory control strategies to minimize cold start emissions ...

  10. Trends in Commercial Buildings--Floorspace Trend Detail

    U.S. Energy Information Administration (EIA) Indexed Site

    because the CBECS is a sample survey (see Overview of the Commercial Buildings Energy Consumption Survey for further discussion). Changes between successive surveys are...

  11. Trends in Commercial Buildings--Detailed Buildings and Floorspace...

    U.S. Energy Information Administration (EIA) Indexed Site

    ** estimates adjusted to match the 1995 CBECS definition of target population Energy Information Administration Commercial Buildings Energy Consumption Survey Table 2....

  12. Trends in Commercial Buildings--Buildings and Floorspace

    U.S. Energy Information Administration (EIA) Indexed Site

    activity. Number of Commercial Buildings In 1979, the Nonresidential Buildings Energy Consumption Survey estimated that there were 3.8 million commercial buildings in the...

  13. Coordination of Federal Transmission Permitting on Federal Lands (216(h)) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Planning » Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land.

  14. Federal Protective Force

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-07-15

    This Manual establishes requirements for the management and operation of the Department of Energy (DOE) Federal protective forces (FPFs). Cancels DOE M 470.4-3, Chg 1. Canceled by DOE O 473.3.

  15. Award Number: Federal Non-Federal Federal Non-Federal Total

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    i. Total Direct Charges (sum of 6a-6h) Grant Program, Function or Activity Object Class ... Catalog of Federal Domestic Assistance Number Grant Program Function or Activity Estimated ...

  16. Federal Employee Health Services

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-12-01

    To establish requirements and responsibilities for occupational medical, employee assistance, and workers' compensation programs for Federal employees. Cancels DOE 3790.1B. Canceled by DOE O 341.1A.

  17. Federal Thought Leaders Roundtable

    Broader source: Energy.gov [DOE]

    FEMP Director Timothy Unruh will facilitate a round table discussion on cutting-edge topics among senior agency officials. Federal thought leaders will share insights, candid assessments, and challenge the status quo.

  18. Federal Water Use Indices

    Broader source: Energy.gov [DOE]

    FEMP provides water use indices as a guide for Federal agencies. Note that each is a rough estimate of water usage at different types of sites. Your site may vary considerably.

  19. Verifying the INF and START treaties

    SciTech Connect (OSTI)

    Ifft, Edward

    2014-05-09

    The INF and START Treaties form the basis for constraints on nuclear weapons. Their verification provisions are one of the great success stories of modern arms control and will be an important part of the foundation upon which the verification regime for further constraints on nuclear weapons will be constructed.

  20. Project LIBERTY Biorefinery Starts Cellulosic Ethanol Production

    Broader source: Energy.gov [DOE]

    Project LIBERTY, the nation’s first commercial-scale cellulosic ethanol plant to use corn waste as a feedstock, announced the start of production today. Once operating at full, commercial-scale, the biorefinery in Emmetsburg, Iowa will produce 25 million gallons of cellulosic ethanol per year - enough to avoid approximately 210,000 tons of CO2 emissions annually.

  1. START Renewable Energy Project Development Assistance

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Indian Energy is now accepting applications for the third round of the Strategic Technical Assistance Response Team (START) Renewable Energy Project Development Assistance Program to provide Tribes with technical assistance with furthering the development of community- and commercial-scale renewable energy projects.

  2. Federal Employee Health Benefits (FEHB)

    Broader source: Energy.gov [DOE]

    The Federal Employees Health Benefits (FEHB) program is the largest employer-sponsored health insurance program in the world, covering more than 8 million Federal employees, retirees, former...

  3. Federal Register | Open Energy Information

    Open Energy Info (EERE)

    of Federal agencies, and provides a forum for public participation in the democratic process. The publications provide access to a wide range of Federal benefits and...

  4. Starting apparatus for internal combustion engines

    DOE Patents [OSTI]

    Dyches, Gregory M.; Dudar, Aed M.

    1997-01-01

    An internal combustion engine starting apparatus uses a signal from a curt sensor to determine when the engine is energized and the starter motor should be de-energized. One embodiment comprises a transmitter, receiver, computer processing unit, current sensor and relays to energize a starter motor and subsequently de-energize the same when the engine is running. Another embodiment comprises a switch, current transducer, low-pass filter, gain/comparator, relay and a plurality of switches to energize and de-energize a starter motor. Both embodiments contain an indicator lamp or speaker which alerts an operator as to whether a successful engine start has been achieved. Both embodiments also contain circuitry to protect the starter and to de-energize the engine.

  5. The Physics of Tokamak Start-Up

    Office of Scientific and Technical Information (OSTI)

    6 PPPL- 4836 The Physics of Tokamak Start-Up December, 2012 D. Mueller Princeton Plasma Physics Laboratory Report Disclaimers Full Legal Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors or their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for

  6. SNL Starting Points | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    SNL Starting Points Sandia Field Office Home Page SNL Contract DOE Directives NNSA Policy System SNL's Economic Impact Brochure SNL's Fact Sheets SNL's Accomplishments SNL Strategic Plan SNL Strategic Plan FY16-FY20 State of the Labs Presentation State of the Labs Presentation 2015 SNL Corporate Overview and Organization (Updated on May 12) SNL Corporate Overview FY16 SNL Corporate Overview FY 16 Presenter Notes SNL Organization Chart Agreements 2014 MTC Joint Review CBA 2014 OPEIU CBA 2014 SPA

  7. Getting Started | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Getting Started Create a Profile Students working in lab Your candidate profile is your way to communicate to our recruiters information about your experience, education, and job preferences. Feel free to update it as frequently as necessary. You may attach resumes and transcripts to the profile. Additionally, you must release your profile for us to access it. You may enter the profile and release it for viewing by our recruiters at any time. Apply For Jobs The profile you create is considered a

  8. Federal Employee Training

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-09-21

    To plan and establish requirements and assign responsibilities for Department of Energy (DOE) Federal employee training, education, and development under the Government Employees Training Act of 1958, as amended. Cancels DOE O 360.1. Canceled by DOE O 360.1B.

  9. Federal Employee Training

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-10-11

    To plan and establish requirements and assign responsibilities for Department of Energy (DOE) Federal employee training, education, and development (hereafter referred to as "training") under the Government Employees Training Act of 1958. Cancels DOE O 360.1A. Canceled by DOE O 360.1C.

  10. Federal Technical Capability

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2009-11-19

    To define requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Chg 1 dated 9-20-11 supersedes DOE O 426.1 and cancels DOE P 426.1.

  11. Federal Employee Training

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-07-06

    This Order establishes requirements and responsibilities for DOE Federal employee training in accordance with Chapter 41 of Title 5, United States Code (U.S.C.). Supersedes DOE O 360.1B and DOE M 360.1-1B.

  12. WIPP Documents - Federal Regulations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Regulations 40 CFR Part 191 Environmental radiation protection standards for management and disposal of spent nuclear fuel, high-level and transuranic radioactive wastes. 40 CFR Part 194 Criteria for the certification and re-certification of the Waste Isolation Pilot Plant's compliance with the 40 CFR Part 191 disposal regulations.

  13. Federal Sustainable Print Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-11-17

    The Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental Sustainability, dated 5-2-11, and related to the sustainability requirements contained in Executive Order 13693, "Planning for Federal Sustainability in the Next Decade." Does not cancel/supersede other directives.

  14. Federal Sustainable Print Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-07-07

    This Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental Sustainability, dated 5-2-11 and related to the sustainability requirements contained in Executive Order 13693, "Planning for Federal Sustainability in the Next Decade”.

  15. Department of Energy Small Business Conference Starts Today in Kansas City,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Missouri | Department of Energy Small Business Conference Starts Today in Kansas City, Missouri Department of Energy Small Business Conference Starts Today in Kansas City, Missouri May 10, 2011 - 12:00am Addthis Washington, D.C. - The U.S. Department of Energy, the largest civilian contracting agency within the Federal government, is holding its 12th Annual Small Business Conference & Expo at the Kansas City Convention Center in Kansas City, Missouri from May 10-12, 2011. Drawing more

  16. Federal Incentives for Water Power

    SciTech Connect (OSTI)

    2013-04-05

    This factsheet lists the major federal incentives for water power technologies available as of April 2013.

  17. GettingStartedGuide.PDF | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GettingStartedGuide.PDF&0; GettingStartedGuide.PDF&0; PDF icon GettingStartedGuide.PDF&0; More Documents & Publications PARS II 104 Contractor Monthly Upload Home Energy Score...

  18. Federal Register | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Register Federal Register Federal Register, dated June 30, 2003. Extracted Pages,Department of Energy, Privacy Act, PArecordsJun30.pdf PDF icon Federal Register More Documents & Publications Privacy Act of 1974; Publication of Compilation of Privacy Act Systems of Records Document, Federal Register / Vol. 69, No. 129 / Wednesday, July 7, 2004 / Notices Document, Federal Register / Vol. 69, No. 17 / Tuesday, January 27, 2004 / Notices

  19. Better Buildings Federal Award | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    winner of the 2013 Better Buildings Federal Award. The Federal Energy Management Program's (FEMP) Better Buildings Federal Award recognizes the federal government's ...

  20. Better Buildings Federal Award | Department of Energy

    Energy Savers [EERE]

    U.S. Courthouse was the winner of the 2013 Better Buildings Federal Award. The Federal Energy Management Program's (FEMP) Better Buildings Federal Award recognizes the federal...

  1. Recovering START institutional knowledge (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Recovering START institutional knowledge Citation Details In-Document Search Title: Recovering START institutional knowledge Authors: Murphy, Chantell L 1 ; Johnson, M. W. 1 ; ...

  2. Recovering START institutional knowledge (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Recovering START institutional knowledge Citation Details In-Document Search Title: Recovering START institutional knowledge You are accessing a document from the Department of ...

  3. Zhengzhou High Tech Start up Investment | Open Energy Information

    Open Energy Info (EERE)

    Zhengzhou High Tech Start up Investment Jump to: navigation, search Name: Zhengzhou High-Tech Start-up Investment Place: Zhengzhou, Henan Province, China Product: Chinese...

  4. Energy Department Extends Deadline to Apply for START Tribal...

    Energy Savers [EERE]

    Extends Deadline to Apply for START Tribal Renewable Energy Project Development Assistance to May 22, 2015 Energy Department Extends Deadline to Apply for START Tribal Renewable...

  5. Property:Geothermal/ProjectStartDate | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Property Name GeothermalProjectStartDate Property Type Date Description Project Start Date Retrieved from "http:en.openei.orgw...

  6. STARTING TODAY: Bloomberg, Daniels, Musk, Pickens, Chu and Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    STARTING TODAY: Bloomberg, Daniels, Musk, Pickens, Chu and Energy Leaders Headline 3-Day ARPA-E Summit STARTING TODAY: Bloomberg, Daniels, Musk, Pickens, Chu and Energy Leaders ...

  7. Needle Federated Search Engine

    Energy Science and Technology Software Center (OSTI)

    2009-12-01

    The Idaho National Laboratory (INL) has combined a number of technologies, tools, and resources to accomplish a new means of federating search results. The resulting product is a search engine called Needle, an open-source-based tool that the INL uses internally for researching across a wide variety of information repositories. Needle has a flexible search interface that allows end users to point at any available data source. A user can select multiple sources such as commercialmore » databases (Web of Science, Engineering Index), external resources (WorldCat, Google Scholar), and internal corporate resources (email, document management system, library collections) in a single interface with one search query. In the future, INL hopes to offer this open-source engine to the public. This session will outline the development processes for making Needle™s search interface and simplifying the federation of internal and external data sources.« less

  8. Federal Interagency Geothermal Activities

    SciTech Connect (OSTI)

    Anderson, Arlene; Prencipe, Loretta; Todaro, Richard M.; Cuyler, David; Eide, Elizabeth

    2011-06-01

    This collaborative document describes the roles and responsibilities of key Federal agencies in the development of geothermal technologies including the U.S. Department of Energy (DOE); the U.S. Department of Agriculture (USDA), including the U.S. Forest Service; the U.S. Department of Interior (DOI), including the United States Geological Survey (USGS) and Bureau of Land Management (BLM); the Environmental Protection Agency (EPA); and the Department of Defense (DOD).

  9. Notices Federal Register

    Energy Savers [EERE]

    documents other than rules or proposed rules that are applicable to the public. Notices of hearings and investigations, committee meetings, agency decisions and rulings, delegations of authority, filing of petitions and applications and agency statements of organization and functions are examples of documents appearing in this section. Notices Federal Register 67156 Vol. 79, No. 218 Wednesday, November 12, 2014 DEPARTMENT OF COMMERCE Census Bureau Proposed Information Collection; Comment

  10. Method and apparatus for starting supersonic compressors

    DOE Patents [OSTI]

    Lawlor, Shawn P

    2013-08-06

    A supersonic gas compressor with bleed gas collectors, and a method of starting the compressor. The compressor includes aerodynamic duct(s) situated for rotary movement in a casing. The aerodynamic duct(s) generate a plurality of oblique shock waves for efficiently compressing a gas at supersonic conditions. A convergent inlet is provided adjacent to a bleed gas collector, and during startup of the compressor, bypass gas is removed from the convergent inlet via the bleed gas collector, to enable supersonic shock stabilization. Once the oblique shocks are stabilized at a selected inlet relative Mach number and pressure ratio, the bleed of bypass gas from the convergent inlet via the bypass gas collectors is effectively eliminated.

  11. Federal Technical Capability Panel

    Energy Savers [EERE]

    Updated: April 2015 1 U. S. Department of Energy and National Nuclear Security Administration Federal Technical Capability Panel Organization Name Telephone Fax E-Mail FTCP CHAIR Chair (DOE/NTC) Karen L. Boardman (505) 845-6444 (505) 845-6079 kboardman@ntc.doe.gov FTCP Deputy Dave Chaney (505) 845-4300 (505) 845-4879 david.chaney@nnsa.doe.gov FTCP Technical Standards Mgr. Jeanette Yarrington (301) 903-7030 (301) 903-3445 Jeanette.Yarrington@hq.doe.gov FTCP Program Coordinator Jeannie Lozoya

  12. Federal Register Notice

    Office of Environmental Management (EM)

    810 Federal Register / Vol. 76, No. 39 / Monday, February 28, 2011 / Proposed Rules Determination of Petition For reasons discussed above, the NRC denies PRM-51-13. Dated at Rockville, Maryland, this 16th day of February 2011. For the Nuclear Regulatory Commission. Michael F. Weber, Acting Executive Director for Operations. [FR Doc. 2011-4347 Filed 2-25-11; 8:45 am] BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION 10 CFR Part 61 [NRC-2011-0043] Public Workshop to Discuss Low-Level

  13. Effect of CNG start - gasoline run on emissions from a 3/4 ton pick-up truck

    SciTech Connect (OSTI)

    Springer, K.J.; Smith, L.R.; Dickinson, A.G.

    1994-10-01

    This paper describes experiments to determine the effect on exhaust emissions of starting on compressed natural gas (CNG) and then switching to gasoline once the catalyst reaches operating temperature. Carbon monoxide, oxides of nitrogen, and detailed exhaust hydrocarbon speciation data were obtained for dedicated CNG, then unleaded gasoline, and finally CNG start - gasoline run using the Federal Test Procedure at 24{degree}C and at -7{degree}C. The results was a reductiopn in emissions from the gasoline baseline, especially at -7{degree}C. It was estimated that CNG start - gasoline run resulted in a 71 percent reduction in potential ozone formation per mile. 3 refs., 6 figs., 11 tabs.

  14. Federated Search Not your ordinary search technology!

    Office of Scientific and Technical Information (OSTI)

    Federated Search at OSTI Download latest version of Flash Player exit federal site to view video

  15. Energy Literacy Quick Start Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quick Start Guide Energy Literacy Quick Start Guide Energy Literacy Quick Start Guide Want to teach about energy but don't know where to start? Our Quick Start Guide will help you take information from the Energy Literacy framework and apply it to your unique classroom--whether you teach physics, environmental science, or even social studies! The guide answers some of your basic questions, such as how Energy Literacy aligns to the Next Generation Science Standards, or where to find fun

  16. START 48 Contiguous United States | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    48 Contiguous United States START 48 Contiguous United States The U.S. Department of Energy (DOE) Office of Indian Energy Strategic Technical Assistance Response Team (START) Program helps competitively selected tribes in the 48 contiguous states, as well as Alaska Native regional corporations, further the development of renewable energy projects. START-supported projects are selected through a competitive application process. Learn more about START projects. The START team is comprised of DOE

  17. Energy Corridors on Federal Lands

    Office of Energy Efficiency and Renewable Energy (EERE)

    To improve energy delivery and enhance the electric transmission grid for the future, several government agencies currently are working together to establish a coordinated network of Federal energy corridors on Federal lands throughout the United States.

  18. Federal Flood Risk Management Standard

    Broader source: Energy.gov [DOE]

    The Federal Flood Risk Management Standard builds upon Executive Order (E.O.) 11988 and is to be incorporated into existing Federal department and agency processes used to implement E.O. 11988.

  19. Meeting Federal Energy Security Requirements

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

  20. Federal Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Regulations Federal Regulations NOTE: Adobe Acrobat Reader may be necessary to view PDF documents listed below. Accessibility Section 508 of the Rehabilitation Act - Electronic and Information Technology Accessibility Standards Section 504 of the Rehabilitation Act - Nondiscrimination Under Federal Grants and Programs Federal Records Act Freedom of Information Act (as amended) Freedom of Information Act Updates Privacy Act of 1974 (as amended) Privacy Act Overview Cyber Security Atomic

  1. SOUTHEASTERN FEDERAL POWER ALLIANCE Sam Nunn Federal Building

    Energy Savers [EERE]

    SOUTHEASTERN FEDERAL POWER ALLIANCE Sam Nunn Federal Building 61 Forsyth Street SW, Atlanta, GA 30303 April 2, 2015 April 1, 2015: Meet on the Glenn Hotel roof at 6:00 p.m. to walk to Dutch-treat dinner at Ted's Montana Grill, 133 Luckie Street Northwest. April 2, 2015: Meeting will begin at 8:30 a.m. in the Sam Nunn Federal Building. *************************************** 1. Welcome, Announcements & Introductions .................................................. Joel Seymour 2. Opening

  2. Property:Building/StartPeriod | Open Energy Information

    Open Energy Info (EERE)

    to: navigation, search This is a property of type Date. Start of the period (first day o the month) Pages using the property "BuildingStartPeriod" Showing 25 pages using this...

  3. Natural gas inventories heading to record levels at start of...

    U.S. Energy Information Administration (EIA) Indexed Site

    Natural gas inventories heading to record levels at start of winter heating season U.S. natural gas inventories are expected to be at record levels to start the winter heating ...

  4. New Jersey SmartStart Buildings- New Construction and Retrofits

    Broader source: Energy.gov [DOE]

    New Jersey SmartStart Buildings is a program sponsored by the New Jersey Board of Public Utilities in partnership with New Jersey’s gas and electric utilities. New Jersey SmartStart Buildings rec...

  5. Green Business in Indian Country Start-Up Award

    Broader source: Energy.gov [DOE]

    Trees, Water, & People is accepting applications for the Green Business in Indian Country Start-Up Award and offering assistance to one selected applicant in starting their own business in a related field.

  6. Edison Down for About One Month Starting June 24

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Edison Down for About One Month Starting June 24 Edison Down for About One Month Starting June 24 June 4, 2013 by Francesca Verdier The Edison Phase II system arrives at NERSC in...

  7. Property:ASHRAE 169 Start Date | Open Energy Information

    Open Energy Info (EERE)

    Start Date Jump to: navigation, search This is a property of type Date. Pages using the property "ASHRAE 169 Start Date" Showing 25 pages using this property. (previous 25) (next...

  8. Construction, Qualification, and Low Rate Production Start-up...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Construction, Qualification, and Low Rate Production Start-up of a DC Bus Capacitor High ... Construction, Qualification, and Low Rate Production Start-up of a DC Bus Capacitor High ...

  9. Summary Description Federal Acquisition Circular 2005-58 Federal...

    Broader source: Energy.gov (indexed) [DOE]

    Federal preference for purchasing biobased products. Contractors may need to create an inventory management system to track the biobased products purchased for each contract....

  10. The Federal Energy Administration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Federal Energy Administration The Federal Energy Administration The Federal Energy Administration - written by Roger Anders Washington, D.C.: U.S. Department of Energy, ...

  11. Federal Renewable Energy Projects and Technologies

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy Management Program (FEMP) provides resources and tools that help federal agencies implement renewable energy projects and technologies to meet federal laws and requirements.

  12. Southeastern Federal Power Alliance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southeastern Federal Power Alliance Southeastern Federal Power Alliance Southeastern Federal Power Alliance logo Partners Advancing Clean, Reliable Hydropower Sensing a need for a ...

  13. Renewable Energy Projects at Federal Facilities | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Federal Energy Management Program (FEMP) tracks the following examples of renewable energy projects at federal facilities. To find a federal renewable energy project, browse the ...

  14. Federated Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Federated Wind Farm Jump to: navigation, search Name Federated Wind Farm Facility Federated Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner...

  15. Memorandum of Understanding Regarding Coordination in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, ...

  16. Federal Energy Management Program Report Template | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Management Program Report Template Federal Energy Management Program Report Template Template to create reports for the Federal Energy Management Program (FEMP)...

  17. Coordination of Federal Authorizations for Electric Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183 - Sep. 19, 2008 Coordination of Federal Authorizations for...

  18. Federal Agency NEPA Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Agency NEPA Procedures Federal Agency NEPA Procedures Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in...

  19. Reducing cold-start emissions by catalytic converter thermal management

    SciTech Connect (OSTI)

    Burch, S D; Potter, T F; Keyser, M A; Brady, M J; Michaels, K F

    1995-01-01

    Vacuum insulation and phase-change thermal storage have been used to enhance the heat retention of a prototype catalytic converter. Storing heat in the converter between trips allows exhaust gases to be converted more quickly, significantly reducing cold-start emissions. Using a small metal hydride, the thermal conductance of the vacuum insulation can be varied continuously between 0.49 and 27 W/m{sup 2}K (R-12 to R-0.2 insulation) to prevent overheating of the catalyst. A prototype was installed in a Dodge Neon with a 2.0-liter engine. Following a standard preconditioning and a 23-hour cold soak, an FTP (Federal Test Procedure) emissions test was performed. Although exhaust temperatures during the preconditioning were not hot enough to melt the phase-change material, the vacuum insulation performed well, resulting in a converter temperature of 146{degrees}C after the 23-hour cold soak at 27{degrees}C. Compared to the same converter at ambient conditions, overall emissions of CO and HC were reduced by 52 % and 29 %, to 0.27 and 0.037 g/mile, respectively. The maximum converter temperature during the FTP cycle was 720{degrees}C. This limited testing was performed with a nearly-fresh palladium-only catalyst, but demonstrates the potential of this vacuum insulation approach for emissions reduction and thermal control. Further testing is ongoing. An initial assessment of several production issues is made, including high-volume fabrication challenges, durability, and cost.

  20. Federal Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Regulations Federal Regulations keyboard-621831_960_720.jpg Cybersecurity Atomic Energy Act of 1954 (pdf) Computer Fraud and Abuse Act of 1986 Electronic Communications Privacy Act of 1986 Federal Information Security Management Act of 2002 (Title III of E-Gov) Homeland Security Act of 2002 (includes Cyber Security Act of 2002 and Critical Infrastructure Act of 2002) Uniting and Strengthening America by Providing Appropriate Tools Required to Intercept and Obstruct Terrorism Act Cyber

  1. Federal Electronics Challenge Gold Award

    Broader source: Energy.gov [DOE]

    On June 18th, DOE Headquarters was presented the Federal Electronics Challenge Gold Award for exemplary performance in Green Computing, including green procurement, energy efficient operations and...

  2. Federal Buildings Supplemental Survey -- Overview

    U.S. Energy Information Administration (EIA) Indexed Site

    Buildings The Federal Buildings Supplemental Survey 1993 provides building-level energy-related characteristics for a special sample of commercial buildings owned by the...

  3. Federal Buildings Supplemental Survey 1993

    U.S. Energy Information Administration (EIA) Indexed Site

    6. Electricity Consumption and Expenditure Intensities in FBSS Buildings in Federal Region 3, 1993 Electricity Consumption Electricity Expenditures Distribution of Building-Level...

  4. Federal Buildings Supplemental Survey 1993

    U.S. Energy Information Administration (EIA) Indexed Site

    grants to Federal agencies to implement energy efficiency and water conservation projects. (See Energy Conservation Program Assistance and Retrofit or Purchase of Any...

  5. Federal Spectrum Management at the National Telecommunications...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Spectrum Management at the National Telecommunications and Information Administration Federal Spectrum Management at the National Telecommunications and Information ...

  6. 30-Day Federal Register Notice - Proposed

    Energy Savers [EERE]

    30-Day Federal Register Notice - Extension 30-Day Federal Register Notice - Extension Record Extension-30 Day Federal Register Notice PDF icon 30-Day Federal Register Notice - Extension More Documents & Publications 30 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Proposed - FINAL

    Revised 11-2009 30-Day Federal Register Notice - Proposed [6450-01-P] DEPARTMENT OF ENERGY Proposed Agency Information Collection AGENCY:

  7. Executive Order 13423: Strengthening Federal Environmental, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management Executive Order 13423: Strengthening Federal Environmental, Energy, and ...

  8. Federal Aviation Administration | Open Energy Information

    Open Energy Info (EERE)

    Aviation Administration Jump to: navigation, search Logo: Federal Aviation Administration Name: Federal Aviation Administration Address: 800 Independence Ave., SW Place:...

  9. Start-up control system and vessel for LMFBR

    DOE Patents [OSTI]

    Durrant, Oliver W.; Kakarala, Chandrasekhara R.; Mandel, Sheldon W.

    1987-01-01

    A reflux condensing start-up system includes a steam generator, a start-up vessel connected parallel to the steam generator, a main steam line connecting steam outlets of the steam generator and start-up vessel to a steam turbine, a condenser connected to an outlet of the turbine and a feedwater return line connected between the condenser and inlets of the steam generator and start-up vessel. The start-up vessel has one or more heaters at the bottom thereof for heating feedwater which is supplied over a start-up line to the start-up vessel. Steam is thus generated to pressurize the steam generator before the steam generator is supplied with a heat transfer medium, for example liquid sodium, in the case of a liquid metal fast breeder reactor. The start-up vessel includes upper and lower bulbs with a smaller diameter mid-section to act as water and steam reservoirs. The start-up vessel can thus be used not only in a start-up operation but as a mixing tank, a water storage tank and a level control at low loads for controlling feedwater flow.

  10. Start-up control system and vessel for LMFBR

    DOE Patents [OSTI]

    Durrant, Oliver W.; Kakarala, Chandrasekhara R.; Mandel, Sheldon W.

    1987-01-01

    A reflux condensing start-up system comprises a steam generator, a start-up vessel connected parallel to the steam generator, a main steam line connecting steam outlets of the steam generator and start-up vessel to a steam turbine, a condenser connected to an outlet of the turbine and a feedwater return line connected between the condenser and inlets of the steam generator and start-up vessel. The start-up vessel has one or more heaters at the bottom thereof for heating feedwater which is supplied over a start-up line to the start-up vessel. Steam is thus generated to pressurize the steam generator before the steam generator is supplied with a heat transfer medium, for example liquid sodium, in the case of a liquid metal fast breeder reactor. The start-up vessel includes upper and lower bulbs with a smaller diameter mid-section to act as water and steam reservoirs. The start-up vessel can thus be used not only in a start-up operation but as a mixing tank, a water storage tank and a level control at low loads for controlling feedwater flow.

  11. SOUTHEASTERN FEDERAL POWER ALLIANCE Martin Luther King, Jr. Federal...

    Broader source: Energy.gov (indexed) [DOE]

    Martin Luther King, Jr. Federal Building 77 Forsyth Street SW, Atlanta, GA 30303 November 6, 2014 November 5, 2014: Meet at the Glenn Hotel lobby at 6:00 p.m. to walk to...

  12. Energy Literacy Framework A Quick Start Guide for Educators

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Framework A Quick Start Guide for Educators Energy - it's everywhere! When you turn on the lights, listen to the radio, heat your home, fuel your car, or use a computer, you are using energy. Energy is crucial to every- thing we do and experience. Understanding energy can help us make better informed decisions about our homes, communities, and our nation. If you are new to energy education, then the following answers to questions about Energy Literacy will help you get started. Start thinking

  13. Getting Started on ALCF Resources - Videoconferences | Argonne Leadership

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Computing Facility Getting Started on ALCF Resources - Videoconferences Getting Started on ALCF Resources - Videoconferences Geared especially for new users, Getting Started on ALCF Resources videoconferences are highly interactive and cover the basics you'll need to get your projects up and running. Learn: - How to minimize your wait time in job queues - Tips for backing up your data Practice: - Building your code on Blue Gene/Q - Submitting jobs For your convenience, this videoconference

  14. NNSA Authorizes Start-Up of Highly Enriched Uranium Materials...

    National Nuclear Security Administration (NNSA)

    Authorizes Start-Up of Highly Enriched Uranium Materials Facility at Y-12 | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the...

  15. COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    COST BREAKDOWN AWARD NO: START DATE: EXPIRATION DATE: FISCAL YEAR BREAKDOWN OF FUNDS ELEMENTS FY FY FY FY FY TOTAL Direct Labor Overhead Materials Supplies Travel Other Direct...

  16. Eleven Tribes Jump START Clean Energy Projects, Summer 2012 ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... and Kevin Davidson of the Hualapai Tribe Planning and Economic Development Department discuss utility-scale solar and wind project potential during a START site visit in Arizona. ...

  17. Property:Incentive/StartDateString | Open Energy Information

    Open Energy Info (EERE)

    Pages using the property "IncentiveStartDateString" Showing 25 pages using this property. (previous 25) (next 25) 3 30% Business Tax Credit for Solar (Vermont) +...

  18. Major Projects with Quick Starts & Jobs Creation Office of Clean...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Major Projects with Quick Starts & Jobs Creation Office of Clean Coal Summary of Projects ... Carbon dioxide capture and storage (CCS) is a technology that is indispensable in ...

  19. Cold-Start Emissions Control in Hybrid Vehicles Equipped with...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Adsorber for Hydrocarbons and NOx Cold-Start Emissions Control in Hybrid Vehicles Equipped with a Passive Adsorber for Hydrocarbons and NOx Reports results from study of ...

  20. 20 MW Maibarara Geothermal Power Project Starts Commercial Operations...

    Open Energy Info (EERE)

    02092014 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for 20 MW Maibarara Geothermal Power Project Starts Commercial Operations...

  1. PPPL physicists simulate innovative method for starting up tokamaks...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PPPL physicists simulate innovative method for starting up tokamaks without using a solenoid By Raphael Rosen January 4, 2016 Tweet Widget Google Plus One Share on Facebook PPPL...

  2. Minto Upgrades Community Lodge with START Support, Fall/Winter...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... with other federal agencies as part of the White House Council on Native American Affairs. ... labs, or find other work improving energy security and sustainability in Indian Country. ...

  3. Federal Advisory Committee Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Advisory Committee Management Federal Advisory Committee Management The Federal Advisory Committee Management Program assures the Department of Energy's overall compliance with the Federal Advisory Committee Act (FACA). The program is located in the Office of the Executive Secretariat. Federal Advisory Committee Act The Federal Advisory Committee Act of 1972 (Public Law 92-463) establishes the policies and minimum requirements for Federal agencies to manage and administer advisory

  4. Federal Government Project Performance Benchmarks

    Broader source: Energy.gov [DOE]

    Reports five major performance metrics that can be used to benchmark proposed energy service company projects within the federal government, disaggregated and reported by major retrofit strategy. Author: U.S. Department of Energy

  5. Sustainability in Existing Federal Buildings

    Broader source: Energy.gov [DOE]

    For meeting federal sustainability requirements, agencies can use evaluation methods, such as benchmarking and energy audits, and planning to make existing buildings energy efficient. Agencies can follow these steps to comply with energy reduction requirements.

  6. Federal Government Project Performance Benchmarks

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Government Project Performance Benchmarks (All ASHRAE Zones) We define an ESCO as a company that provides energy efficiency-related and other value-added services and that ...

  7. Federal Buildings Supplemental Survey 1993

    U.S. Energy Information Administration (EIA) Indexed Site

    3. Consumption and Expenditures for Sum of Major Fuels, Electricity, and Natural Gas in FBSS Buildings in Federal Region 3, 1993 Sum of Sum of Major Major Electricity Natural...

  8. Federal Substance Abuse Testing Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-01-30

    The Order establishes the requirements and responsibilities for the DOE Federal Substance Abuse Testing Program which covers drug and alcohol testing. Supersedes DOE O 3792.3 Chg 1.

  9. * Milepost Federal Energy Regulatory Commission

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... L.P. CEQ Council on Environmental Quality CFR Code of Federal Regulations CGT Columbia Gulf ... the late 1970s at the Naval Weapons Center in China Lake, California. ...

  10. Federal Interagency Geothermal Activities 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Office of Energy Efficiency and Renewable Energy U.S. Department of Energy FEDERAL INTERAGENCY GEOTHERMAL ACTIVITIES Updated JUNE 2011 WORKING DRAFT 2 FEDERAL INTERAGENCY GEOTHERMAL ACTIVITIES D R A F T The principal organizers of this updated document were Arlene Anderson of the Geothermal Technologies Program, U.S. Department of Energy, and Loretta Prencipe, Richard M. Todaro (technical editor), New West Technologies, LLC, and David Cuyler, Distinguished Technical Fellow, Sandia

  11. Federal Authorities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Authorities Federal Authorities DOE is the Sector Specific Agency (SSA) for Energy and within the Department ISER oversees all activities associated with the National Infrastructure Protection Plan (NIPP) and the Energy Sector Specific Plan (SSP). In doing so, ISER maintains a close partnership with the two Energy Sector Coordinating Councils (SCCs), the Electricity SCC and the Oil and Natural Gas SCC, and governmental partners through the Critical Infrastructure Protection Advisory

  12. Federal Reporting Recipient Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Reporting Recipient Information Federal Reporting Recipient Information Recovery Act Recipient Reporting details as of March 6, 2012. File ARRA870A Recovery Act - Recip Details 03062012.xlsx More Documents & Publications Federal Reporting Recipient Information Federal Reporting Recipient Information Federal Reporting Recipient Information

  13. Federal Acquisition Circular 2005-37

    Broader source: Energy.gov [DOE]

    Federal Acquisition Circular 2005-37, which makes miscellaneous changes to the Federal Acquisition Regulation, was published in the October 14,2009, issue of the Federal Register. A summary of the changes is attached.

  14. Federal Energy Savings Performance Contracting Steering Committee

    Broader source: Energy.gov [DOE]

    The Federal Energy Savings Performance Contracting (ESPC) Steering Committee shares experiences and lessons learned and coordinates process and procedural improvements among federal agency implementers to promote improved ESPCs throughout the federal government.

  15. Federal Acquisition Circular 2005-58

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-58 which makes miscellaneous changes to the Federal Acquisition Regulation. The Circular was published in the Federal Register on April 18, 2012 at 77 FR 23363.

  16. Federal Utility Program Overview (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-07-01

    Fact sheet overview of the U.S. Department of Energy (DOE) Federal Energy Management Program's (FEMP) Federal Utility Program, including common contracts and services available to Federal agencies through local serving utilities.

  17. BETO Federal Partnerships | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    BETO Federal Partnerships BETO Federal Partnerships EERE Federal Partnerships 2013 PDF icon program_management_review2013_collaborations_lindauer.pdf More Documents & Publications 2015 Program Management Review Presentations 2015 Peer Review Presentations-Plenaries Bioenergy Technologies Office Overview

  18. Effect of CNG start-gasoline run on emissions from a 3/4 ton pick-up truck

    SciTech Connect (OSTI)

    Springer, K.J.; Smith, L.R.; Dickinson, A.G.

    1994-10-01

    This paper describes experiments to determine the effect on exhaust emissions of starting on compressed natural gas (CNG) and then switching to gasoline once the catalyst reaches operating temperature. Carbon monoxide, oxides of nitrogen, and detailed exhaust hydrocarbon speciation data were obtained for dedicated CNG, then unleaded gasoline, and finally CNG start-gasoline run using the Federal Test Procedure at 24{degree}C and at -7{degree}C. The result was a reduction in emissions from the gasoline baseline, especially at -7{degree}C. It was estimated that CNG start - gasoline run resulted in a 71 percent reduction in potential ozone formation per mile. 3 refs., 6 figs., 11 tabs.

  19. DOE Provides $30 Million to Jump Start Bioenergy Research Centers |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 30 Million to Jump Start Bioenergy Research Centers DOE Provides $30 Million to Jump Start Bioenergy Research Centers October 1, 2007 - 2:49pm Addthis DOE Bioenergy Research Center Investment Tops $400 Million WASHINGTON, DC-The U.S. Department of Energy (DOE) today announced it has invested nearly $30 million in end-of-fiscal-year (2007) funds to accelerate the start-up of its three new Bioenergy Research Centers, bringing total DOE Bioenergy Research Center investment

  20. Berkeley Lab Technology Spawns Successful Start-up Companies | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Berkeley Lab Technology Spawns Successful Start-up Companies Berkeley Lab Technology Spawns Successful Start-up Companies October 25, 2010 - 10:58am Addthis Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs What are the key facts? Three start-up companies using Berkeley-developed technology have either had highly successful launches or closed major deals in the last several months. Ed. Note cross posted from Berkeley Lab News Center, written by Julie Chao.

  1. Funding Federal Energy and Water Projects

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL ENERGY MANAGEMENT PROGRAM Funding Federal Energy and Water Projects The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps Federal agencies identify and obtain funding for energy efficiency, renewable energy, water conservation, and greenhouse gas (GHG) management projects. Federal agencies cannot rely on Congressional appropriations alone to fund the energy projects needed to meet Federal require- ments. Additional funding options are available, including: *

  2. Federal Utility Partnership Working Group Meeting: Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presentation-given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) ... More Documents & Publications Federal Utility Partnership Working Group Meeting: ...

  3. Federal Utility Partnership Working Group Seminar: Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Seminar: Chairman's Corner Federal Utility Partnership Working Group Seminar: Chairman's Corner Presentation covers the Federal Utility Partnership Working Group Seminar: Chairman's ...

  4. Federal Utility Partnership Working Group Meeting: Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Utility Partnership Working Group Meeting: Chairman's Corner Presentation-given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting-lists key ...

  5. Federal Utility Partnership Working Group Meeting: Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Utility Partnership Working Group Meeting: Washington Update PDF icon fupwgspring12unruh.pdf More Documents & Publications Federal Utility Partnership Working Group ...

  6. Federal Utility Partnership Working Group Meeting Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Utility Partnership Working Group Meeting Chairman's Corner Presentation-given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting-lists key utility ...

  7. Federal / State Legislative & Regulatory Changes Required for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Waiver Decision E15 Implementation Issues Federal and State Blending Restrictions Action by ASTM NCWM to address higher ethanol blends PDF icon Federal State Legislative & ...

  8. Guiding Principles for Sustainable Federal Buildings

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program provides guidance to help agencies comply with the Guiding Principles for Federal Leadership in High-Performance and Sustainable Buildings.

  9. Federally Led Accident Investigation Reports | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federally Led Accident Investigation Reports Federally Led Accident Investigation Reports Includes Pre-March 2011 Type A Reports June 1, 1999 Type A Accident Investigation Board...

  10. Federal Loan Program | Open Energy Information

    Open Energy Info (EERE)

    less. In recent years, the federal government has offered loans for renewables and energy efficiency projects. 1 Federal Loan Program Incentives CSV (rows 1 - 13) Incentive...

  11. Federal Progress Toward Energy/Sustainability Goals

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Progress Toward Energy Sustainability Goals June 10, 2014 Chris Tremper Program Analyst, Federal Energy Management Program U.S. Department of Energy 2 Overall Federal Energy...

  12. Federal NEPA Contacts | Department of Energy

    Energy Savers [EERE]

    Federal NEPA Contacts CEQ and most Federal agencies identify primary points of contact for NEPA compliance. Normally a senior environmental professional, environmental law...

  13. Federal Acquisition Circular 2005-39

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-39 which makes miscellaneous changes to the Federal Acquisition Regulation.

  14. Funding Mechanisms for Federal Geothermal Permitting (Presentation)

    SciTech Connect (OSTI)

    Witherbee, K.

    2014-03-01

    This presentation is about the GRC paper, which discusses federal agency revenues received for geothermal projects and potential federal agency budget sources for processing geothermal applications.

  15. Federal Thought Leaders Roundtable Video Transcript

    Broader source: Energy.gov [DOE]

    First Thursday Seminar. Federal Thought Leaders Roundtable. Federal energy and environmental leaders share insights and discuss sustainability goals, policies, and initiatives. Energy champions...

  16. Federal Energy Subsidies | Open Energy Information

    Open Energy Info (EERE)

    Federal Energy Subsidies Jump to: navigation, search Does wind energy receive federal subsidies, and if so how much? Do other forms of energy receive subsidies? Do fossil fuels...

  17. Federal Utility Partnership Working Group Utility Partners

    Broader source: Energy.gov [DOE]

    Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

  18. Federal Acquisition Circular 2005-63

    Broader source: Energy.gov [DOE]

    The Federal Acquisition Regulation (FAR) amendment published in the December 10, 2012 Federal Register at 77 FR 73516 implements FAR Case 2012–030 Iran Threat Reduction.

  19. Federal Register Notices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Register Notice, Volume 80, No. 42 - March 4, 2015 Application from Sempra to export electric energy to Mexico. Federal Register Notice. February 17, 2015 Electricity...

  20. Federal Energy Efficiency through Utility Partnerships

    SciTech Connect (OSTI)

    Not Available

    2007-08-01

    Two-page fact sheet on FEMP's Federal Utility Program that works with federal agencies and their utilities to reduce energy use.

  1. Sustainable Federal Fleets | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plug-in hybrid electric vehicles charge at a rapid charging system powered by a solar canopy. The Federal Energy Management Program's (FEMP) Sustainable Federal Fleets section ...

  2. Competing Federal Utility Energy Service Contracts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    utility companies ensures federal agencies get the best value for their projects. ... management require federal agencies to evaluate each utility and select the best value. ...

  3. FY 2008 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2008 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2008 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  4. FY 2010 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2010 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2010 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  5. FY 2009 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2009 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2009 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  6. FY 2006 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2006 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2006 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  7. FY 2007 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2007 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2007 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  8. FY 2011 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2011 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2011 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  9. Federal Buildings Supplemental Survey - Index Page

    U.S. Energy Information Administration (EIA) Indexed Site

    Buildings 1993 Federal Buildings Supplemental Survey Overview Full Report Tables Energy usage and energy costs, by building characteristics, for federally-owned buildings in...

  10. Federal Acquisition Circular 2005-53

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-53 which makes miscellaneous changes to the Federal Acquisition Regulation.

  11. Federal Highway Administration | Open Energy Information

    Open Energy Info (EERE)

    Administration Jump to: navigation, search Logo: Federal Highway Administration Name: Federal Highway Administration Abbreviation: FHWA Address: 1200 New Jersey Ave, SE Place:...

  12. Federal Business Opportunities website | Open Energy Information

    Open Energy Info (EERE)

    Opportunities website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Federal Business Opportunities website Abstract This website lists federal...

  13. 2006 National Electric Transmission Congestion Study Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

  14. Designation Memo: Federal Technical Capability Panel Chairperson...

    Energy Savers [EERE]

    Federal Technical Capability Panel Chairperson Designation Memo: Federal Technical Capability Panel Chairperson May 4, 2007, the Deputy Secretary memorandum designating Karen ...

  15. German Renewable Energy Federation | Open Energy Information

    Open Energy Info (EERE)

    Federation Jump to: navigation, search Name: German Renewable Energy Federation Place: Paderborn, Germany Zip: 33100 Sector: Renewable Energy Product: Paderborn-based pressure...

  16. Memorandum: Regarding Delegation of Designated Federal Officials...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Memorandum: Regarding Delegation of Designated Federal Officials for Site Specific Advisory Boards Memorandum: Regarding Delegation of Designated Federal Officials for Site ...

  17. NOTIFICATION AND FEDERAL EMPLOYEE ANTIDISCRIMINATION AND RETALIATION

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Federal agencies, including the Federal Bureau of Investigation, the Bureau of Alcohol, Tobacco, and Firearms, the Drug Enforcement Administration, the Immigration and ...

  18. Construction, Qualification, and Low Rate Production Start-up...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of a DC Bus Capacitor High Volume Manufacturing Facility with Capacity to Support 100,000 Electric Drive Vehicles Construction, Qualification, and Low Rate Production Start-up of a...

  19. Subfreezing Start/Stop Protocol for and Advanced Metallic Open...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Subfreezing StartStop Protocol for and Advanced Metallic Open-Flowfield Fuel Cell Stack Part of a 100 million fuel cell award announced by DOE Secretary Bodman on Oct. 25, 2006. ...

  20. St. Gobain Innovation Competition for Start-Ups

    Broader source: Energy.gov [DOE]

    The Saint-Gobain NOVA Innovation Competition rewards start-ups offering the most innovative solutions in the field of habitat, sustainable products, advanced materials, renewable energy sources and high-efficiency building solutions.

  1. Cold-Start Performance and Emissions Behavior of Alcohol Fuels...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Engine Using Transient Hardware-In-Loop Test Meth Cold-Start Performance and Emissions Behavior of Alcohol Fuels in an SIDI Engine Using Transient Hardware-In-Loop Test Meth ...

  2. Science on Saturday starts Jan. 11 | Princeton Plasma Physics...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science on Saturday starts Jan. 11 By Jeanne Jackson DeVoe January 10, 2014 Tweet Widget ... Goldston, discussed "Outer Space" at a Science on Saturday lecture in 2013. (Photo by ...

  3. Gasoline Compression Ignition - Start of Injection Timing Sweep...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact Us For more information, contact Greg Cunningham at (630) 252-8232 or media@anl.gov. Gasoline Compression Ignition - Start of Injection Timing Sweep (VERIFI) Share Topic...

  4. START Site Visit Examines Viability of Tribal Community Solar Project

    Broader source: Energy.gov [DOE]

    Members of the Office of Indian Energy START team, the Southern Ute Tribe, and Southern Ute Alternative Energy meet to discuss a potential solar photovoltaic project using a community ownership model.

  5. Construction, Qualification, and Low Rate Production Start-up...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bus Capacitor High Volume Manufacturing Facility with Capacity to Support 100,000 Electric Drive Vehicles Construction, Qualification, and Low Rate Production Start-up of a DC Bus ...

  6. Kick-Starting the School Year with Operation Clean Desert

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 10, 2012 Kick-Starting the School Year with Operation Clean Desert School is back in session and Operation Clean Desert was there to give it a kick start! On August 21, 2012, the Operation Clean Desert Teacher's Guide made its debut along with the recently revised companion activity book during the 2012 Educator Appreciation Day & Back To School Fair at The Mirage in Las Vegas, NV. Hundreds of teachers attended the event (hosted by MGM Resorts International) and approximately 150

  7. Getting Started with ISO 50001 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance » ISO 50001 Energy Management Standard » Getting Started with ISO 50001 Getting Started with ISO 50001 Companies use an energy management system (EnMS) to establish the policies and procedures to systematically track, analyze, and improve energy efficiency. ISO 50001, the global energy management systems standard, specifies requirements for establishing, implementing, maintaining, and improving an EnMS. The standard is based upon the Plan-Do-Check-Act management system,

  8. Department of Energy Announces Start of Western Area Power Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Recovery Act Project | Department of Energy Start of Western Area Power Administration Recovery Act Project Department of Energy Announces Start of Western Area Power Administration Recovery Act Project September 16, 2009 - 12:00am Addthis WASHINGTON, DC - With the goal of bringing new jobs and green power to the West, Energy Secretary Steven Chu announced today a large-scale transmission project to be financed using funding from the American Recovery and Reinvestment Act. The Western Area

  9. NNSA Authorizes Start-Up of Highly Enriched Uranium Materials...

    National Nuclear Security Administration (NNSA)

    This Site Budget IG Web Policy Privacy No Fear Act Accessibility FOIA Sitemap Federal Government The White House DOE.gov USA.gov Jobs Apply for Our Jobs Our Jobs Working at NNSA...

  10. Stop and Restart Effects on Modern Vehicle Starting System Components

    SciTech Connect (OSTI)

    Windover, Paul R.; Owens, Russell J.; Levinson, Terry M.; Laughlin, Michael; Gaines, Linda

    2015-01-01

    Many drivers of personal and commercial vehicles believe that turning the vehicle off and on frequently instead of idling will cause premature wear of the starter system (starter motor and starter battery). As a result, they are concerned that the replacement cost of the starter motor and/or battery due to increased manual engine cycling would be more than the cumulative cost of the fuel saved by not idling unnecessarily. A number of variables play a role in addressing this complex concern, including the number of starting cycles per day, the time between starting cycles, the intended design life of the starting system, the amount of fuel used to restart an engine, and the cumulative cost of the saved fuel. Qualitative and quantitative information from a variety of sources was used to develop a life-cycle economic model to evaluate the cost and quantify the realistic factors that are related to the permissible frequency of starter motor cycles for the average vehicle to economically minimize engine idle time. Annual cost savings can be calculated depending on shutdown duration and the number of shutdown cycles per day. Analysis shows that cost savings are realized by eliminating idling exceeding one minute by shutting down the engine and restarting it. For a typical motorist, the damage to starting system components resulting from additional daily start cycles will be negligible. Overall, it was found that starter life is mostly dependent on the total number of start cycles, while battery life is more dependent on ensuring a full charge between start events.

  11. Federal Reporting Recipient Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July, 19, 2011 Office spreadsheet icon Federal_Reporting_Recipient_Information.xls

  12. Federal Acquisition Circular 2005-40

    Broader source: Energy.gov [DOE]

    Federal Acquisition Circular 2005-40 implements the Federal Awardee Performance and Integrity Information System (FAPIIS) to the Federal Acquisition Regulation. This FAC was published in the March 23,2010 issue of the Federal Register. A summary of the changes is attached.

  13. Federal Utility Partnership Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Group Federal Utility Partnership Working Group The Federal Utility Partnership Working Group (FUPWG) establishes partnerships and facilitates communications among federal ...

  14. Federal Energy Management Program | Department of Energy

    Energy Savers [EERE]

    Energy Federal Advisory Committee Act with Amendments of 1997 Federal Advisory Committee Act with Amendments of 1997 The Federal Advisory Committee Act became law in 1972 and is the legal foundation defining how federal advisory committees operate. The law has special emphasis on open meetings, chartering, public involvement, and reporting. This version is from the House website, complete with all Amendments and annotations. PDF icon Federal Advisory Committee Act More Documents &

  15. Federal Register Notices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Register Notices Federal Register Notices April 20, 2016 Application to Export Electric Energy OE Docket No. EA-419 MEXTREP #1, LLC: Federal Register Notice, Volume 81, No. 76 - April 20, 2016 Application from MEXTREP to export electric energy to Mexico. Federal Register Notice. April 8, 2016 Electricity Advisory Committee Notice of Open Meeting March 17 and 18, 2016: Federal Register Notice Volume 81, No. 29 - February 12, 2016 This notice announces an open meeting of the Electricity

  16. DOE Federal Aviation Professional Awards | Department of Energy

    Energy Savers [EERE]

    DOE Federal Aviation Professional Awards DOE Federal Aviation Professional Awards PDF icon DOE Federal Aviation Professional Awards More Documents & Publications DOE Federal...

  17. Modeling and cold start in alcohol-fueled engines

    SciTech Connect (OSTI)

    Markel, A.J.; Bailey, B.K.

    1998-05-01

    Neat alcohol fuels offer several benefits over conventional gasoline in automotive applications. However, their low vapor pressure and high heat of vaporization make it difficult to produce a flammable vapor composition from a neat alcohol fuel during a start under cold ambient conditions. Various methods have been introduced to compensate for this deficiency. In this study, the authors applied computer modeling and simulation to evaluate the potential of four cold-start technologies for engines fueled by near-neat alcohol. The four technologies were a rich combustor device, a partial oxidation reactor, a catalytic reformer, and an enhanced ignition system. The authors ranked the competing technologies by their ability to meet two primary criteria for cold starting an engine at {minus}25 deg C and also by several secondary parameters related to commercialization. Their analysis results suggest that of the four technologies evaluated, the enhanced ignition system is the best option for further development.

  18. Edison Down for About One Month Starting June 24

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Edison Down for About One Month Starting June 24 Edison Down for About One Month Starting June 24 June 4, 2013 by Francesca Verdier The Edison Phase II system arrives at NERSC in June, and will boost the Phase I core count by more than a factor of 10. In order to integrate the new components and upgrade existing ones, the entire Edison system will be unavailable for about one month beginning June 24. This includes the login nodes and the scratch file system. Please plan your work accordingly.

  19. Innovative Wave Power Device Starts Producing Clean Power in Hawaii |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Innovative Wave Power Device Starts Producing Clean Power in Hawaii Innovative Wave Power Device Starts Producing Clean Power in Hawaii July 6, 2015 - 6:31pm Addthis With support from the Energy Department and the U.S. Navy, a prototype wave energy device has advanced successfully from initial concept to grid-connected, open-sea pilot testing. The device, called Azura, was recently launched and installed in a 30-meter test berth at the Navy's Wave Energy Test Site (WETS)

  20. scriptEnv - loading modules before starting a script

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scriptEnv - loading modules before starting a script scriptEnv - loading modules before starting a script In some cases a script needs to load modules before the script can be executed, but it can often be inconvenient or impossible to provide wrapper scripts which load the needed modules. CGI scripts on the gpweb resources or in the NERSC portal environment which require the genepool-specific python/perl/R or databases configuration modules are a strong example of this. NERSC provides the

  1. Eleven Tribes Jump START Clean Energy Projects, Summer 2012 (Newsletter)

    SciTech Connect (OSTI)

    Not Available

    2012-06-01

    This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Summer 2012. The U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) has selected 11 Tribes - five in Alaska and six in the contiguous United States - to receive on-the-ground technical support for community-based energy efficiency and renewable energy projects as part of DOE-IE's Strategic Technical Assistance Response Team (START) Program. START finalists were selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with their projects or community. Technical experts from DOE and its National Renewable Energy Laboratory (NREL) will work directly with community-based project teams to analyze local energy issues and assist the Tribes in moving their projects forward. In Alaska, the effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide additional assistance and expertise, as well as funding to fuel the Alaska START initiative.

  2. Fast Thorium Molten Salt Reactors Started with Plutonium

    SciTech Connect (OSTI)

    Merle-Lucotte, E.; Heuer, D.; Le Brun, C.; Brissot, R.; Liatard, E.; Meplan, O.; Nuttin, A.

    2006-07-01

    One of the pending questions concerning Molten Salt Reactors based on the {sup 232}Th/{sup 233}U fuel cycle is the supply of the fissile matter, and as a consequence the deployment possibilities of a fleet of Molten Salt Reactors, since {sup 233}U does not exist on earth and is not yet produced in the current operating reactors. A solution may consist in producing {sup 233}U in special devices containing Thorium, in Pressurized Water or Fast Neutrons Reactors. Two alternatives to produce {sup 233}U are examined here: directly in standard Molten Salt Reactors started with Plutonium as fissile matter and then operated in the Th/{sup 233}U cycle; or in dedicated Molten Salt Reactors started and fed with Plutonium as fissile matter and Thorium as fertile matter. The idea is to design a critical reactor able to burn the Plutonium and the minor actinides presently produced in PWRs, and consequently to convert this Plutonium into {sup 233}U. A particular reactor configuration is used, called 'unique channel' configuration in which there is no moderator in the core, leading to a quasi fast neutron spectrum, allowing Plutonium to be used as fissile matter. The conversion capacities of such Molten Salt Reactors are excellent. For Molten Salt Reactors only started with Plutonium, the assets of the Thorium fuel cycle turn out to be quickly recovered and the reactor's characteristics turn out to be equivalent to Molten Salt Reactors operated with {sup 233}U only. Using a combination of Molten Salt Reactors started or operated with Plutonium and of Molten Salt Reactors started with {sup 233}U, the deployment capabilities of these reactors fully satisfy the condition of sustainability. (authors)

  3. Federal laboratories for the 21st century

    SciTech Connect (OSTI)

    Gover, J.; Huray, P.G.

    1998-04-01

    Federal laboratories have successfully filled many roles for the public; however, as the 21st Century nears it is time to rethink and reevaluate how Federal laboratories can better support the public and identify new roles for this class of publicly-owned institutions. The productivity of the Federal laboratory system can be increased by making use of public outcome metrics, by benchmarking laboratories, by deploying innovative new governance models, by partnerships of Federal laboratories with universities and companies, and by accelerating the transition of federal laboratories and the agencies that own them into learning organizations. The authors must learn how government-owned laboratories in other countries serve their public. Taiwan`s government laboratory, Industrial Technology Research Institute, has been particularly successful in promoting economic growth. It is time to stop operating Federal laboratories as monopoly institutions; therefore, competition between Federal laboratories must be promoted. Additionally, Federal laboratories capable of addressing emerging 21st century public problems must be identified and given the challenge of serving the public in innovative new ways. Increased investment in case studies of particular programs at Federal laboratories and research on the public utility of a system of Federal laboratories could lead to increased productivity of laboratories. Elimination of risk-averse Federal laboratory and agency bureaucracies would also have dramatic impact on the productivity of the Federal laboratory system. Appropriately used, the US Federal laboratory system offers the US an innovative advantage over other nations.

  4. Federal Facility Agreement progress report

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The (SRS) Federal Facility Agreement (FFA) was made effective by the US. Environmental Protection Agency Region IV (EPA) on August 16, 1993. To meet the reporting requirements in Section XXV of the Agreement, the FFA Progress Report was developed. The FFA Progress Report is the first of a series of quarterly progress reports to be prepared by the SRS. As such this report describes the information and action taken to September 30, 1993 on the SRS units identified for investigation and remediation in the Agreement. This includes; rubble pits, runoff basins, retention basin, seepage basin, burning pits, H-Area Tank 16, and spill areas.

  5. Format for Federal Register Notice

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Format for Federal Register Notice Billing Code must appear at the top of the document. This code (6450-01-P) is the same for all Departmental submissions. U.S. DEPARTMENT OF ENERGY PRIVACY ACT OF 1974 ESTABLISHMENT OF A NEW SYSTEM OF RECORDS AGENCY United States Department of Energy. ACTION Proposed Establishment a New Privacy Act System of Records. SUMMARY The summary paragraph should state briefly what action is being proposed in the notice, why the action is necessary, and the intended

  6. Federal Buildings Personnel Training Act of 2010

    Broader source: Energy.gov [DOE]

    On December 14, 2010, President Obama signed the Federal Buildings Personnel Training Act of 2010 into law. This legislation will have an important impact on Federal agency training programs geared...

  7. Guide on Federal Employee Assistance Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-12-01

    This Guide supplements the requirements and responsibilities specified in DOE O 341.1, Federal Employee Health Services, dated 12-1-03, and applies only to Federal employees. Canceled by DOE G 341.1-2A.

  8. Federal Acquisition Circular (FAC) 2005-75

    Broader source: Energy.gov [DOE]

    Attached for your information is a brief summary of Federal Acquisition Regulation (FAR) amendments, published in the June 24, 2014 Federal Register at 79 FR 35858. FAC 2005-75 issued 1 final rule and 2 interim rules.

  9. Federal Flood Risk Management Standard (2015)

    Broader source: Energy.gov [DOE]

    The Federal Flood Risk Management Standard (FFRMS (2015)) expands upon E.O. 11988, Floodplain Management, (1977) by directing that federal agencies use a higher vertical flood elevation and...

  10. Federal Acquisition Circular (FAC) 2005-67

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the June 21, 2013 Federal Register at 78 FR 37668. This FAC issued 8 final rules, 2 interim rules, and a technical amendment.

  11. Federal Acquisition Circular (FAC) 2005-65

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the January 29, 2013 Federal Register at 78 FR 6184. This FAC issued 4 final rules and a technical amendment.

  12. Federal Acquisition Circular (FAC) 2005-71

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the November 25, 2013 Federal Register at 78 FR 70476. This FAC issued 2 final rules and 1...

  13. Elements of a Federal Privacy Program

    Broader source: Energy.gov [DOE]

    The seven elements described in this document provide the basis for a robust federal privacy program, and will assist federal organizations to implement and sustain privacy awareness and stewardship.

  14. Green Power Purchasing Goal for Federal Government

    Office of Energy Efficiency and Renewable Energy (EERE)

    The federal Energy Policy Act of 2005 (EPAct 2005) extended and expanded several previous goals and standards to reduce energy use in existing and new federal buildings. Section 203 of EPAct 2005...

  15. Federal Acquisition Circular 2005-64

    Broader source: Energy.gov [DOE]

    The Federal Acquisition Regulation (FAR) amendment, published in the December 21, 2012 Federal Register at 77 FR 75766, implements FAR Case 2011–028 Nondisplacement of Qualified Workers Under Service Contracts.

  16. Federal Acquisition Circular (FAC) 2005-70

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the September 30, 2013 Federal Register at 78 FR 60168. This FAC issued 2 interim rules.

  17. Federal Digital Strategy | OpenEI Community

    Open Energy Info (EERE)

    Federal Digital Strategy Home Graham7781's picture Submitted by Graham7781(2017) Super contributor 19 September, 2012 - 14:32 OpenEI part of the Federal Digital Strategy data...

  18. Federal Railroad Administration | Department of Energy

    Office of Environmental Management (EM)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities

  19. Federal Energy Administration Act | Open Energy Information

    Open Energy Info (EERE)

    Federal Energy Administration Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Federal Energy Administration ActLegal Abstract...

  20. Exploring Ways to Standardize Federal Energy Contracts

    Broader source: Energy.gov [DOE]

    Presentation—given at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meeting—covers ways to standardize federal energy contracts and initial findings, including savings calculations, assurances and guarantees, equipment performance standards, pricing, and more.

  1. Federal Acquisition Circular (FAC) 2005-66

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the February 28, 2013 Federal Register at 78 FR 13764. This FAC issued 3 final rules, 1 interim rule, and a technical amendment.

  2. Efficient Technologies and Products for Federal Facilities

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) provides a one-stop shop for finding energy- and water-efficient technologies and products that can help agenices meet federal facility goals and requirements.

  3. Alaska Rural Energy Conference- Federal Energy Track

    Broader source: Energy.gov [DOE]

    On the first day of the Alaska Rural Energy Conference, the U.S. Department of Energy (DOE) Office of Indian Energy is hosting a federal energy track to cover federal programs and opportunities for Alaska Native villages.

  4. Federal Acquisition Circular (FAC) 2005-69

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the August 1, 2013 Federal Register at 78 FR 46779. This FAC issued 6 final rules and a technical amendment.

  5. Guidance for Federal Agencies on E.O. 13514 Section 12, Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Executive Order 13514: Comprehensive Federal Fleet Management Handbook OVERVIEW OF EXECUTIVE ORDER 13XXX Federal Leadership in Environmental, Energy ...

  6. Presidential Memorandum Boosts Federal Energy Management

    Broader source: Energy.gov [DOE]

    President Obama signed a memorandum directing the federal government to consume 20% of its electricity from renewable sources by 2020.

  7. Commissioning in Federal Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Federal Buildings Commissioning in Federal Buildings Commissioning in Federal Buildings Commissioning is a quality-assurance process used to verify that a building performs according to the original design and intent, and meets the needs of the owners and occupants. The commissioning process also prepares building staff to operate and maintain the building. Federal agencies are required to make sure building systems and equipment are commissioned in new construction and existing buildings.

  8. Federal Energy and Water Management Awards

    Broader source: Energy.gov [DOE]

    Fact sheet for the Federal Energy and Water Management Awards, including history, legislative drivers, goals and objectives, and event details.

  9. Federal Digital Strategy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Digital Strategy Federal Digital Strategy New expectations require the Federal Government to be ready to deliver and receive digital information and services anytime, anywhere and on any device. It must do so safely, securely, and with fewer resources. To build for the future, the Federal Government has developed a Digital Strategy that embraces the opportunity to innovate more with less, and enables entrepreneurs to better leverage government data to improve the quality of services to

  10. Federal Government Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communication & Engagement » Tribal Programs » Federal Government Resources Federal Government Resources Advisory Council on Historic Preservation - Office of Native American Affairs - ONAA serves as technical adviser to Indian tribes and federal agencies regarding consultation issues that arise in the federal historic preservation review process called the Section 106 process. ONAA has an extensive list of guidance regarding tribal consultation and staff available to assist Indian tribes

  11. Federal Incentives for Water Power (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-05-01

    This fact sheet describes the federal incentives available as of April 2013 for the development of water power technologies.

  12. Competing Federal Utility Energy Service Contracts

    Broader source: Energy.gov [DOE]

    Opening utility energy service contracts to competing franchised utility companies ensures federal agencies get the best value for their projects.

  13. Federal Employee Viewpoint Survey | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy and Guidance » Human Capital Management » Federal Employee Viewpoint Survey Federal Employee Viewpoint Survey The Federal Employee Viewpoint Survey (FedView survey) is a tool that measures employees' perceptions of whether, and to what extent, conditions characterizing successful organizations are present in their agencies. Survey results provide valuable insight into the challenges agency leaders face in ensuring the Federal Government has an effective civilian workforce and how well

  14. Federal Energy Management Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tools Federal Energy Management Tools logo_femp.png The Federal Energy Management Program (FEMP) offers links to tools that can help agencies reduce energy use and meet federal laws and requirements. Tools include software, calculators, data sets, and databases created by the U.S. Department of Energy and other federal organizations. To find a tool, browse by title, description, type, or category. Click a column heading to sort the table. Title Description Type Category Building Life Cycle Cost

  15. Environmentally and Economically Beneficial Practices on Federal...

    Office of Environmental Management (EM)

    Environmentally and Economically Beneficial Practices on Federal Landscaped Grounds This Environmental Protection Agency report contains recommendations for a series of...

  16. FEMP Federal Fleet Files - May 2009 Issue

    SciTech Connect (OSTI)

    2009-06-04

    May 2009 issue of the monthly FEMP newsletter highlighting the latest news and developments impacting Federal fleets.

  17. GSA Solutions for Federally Recognized Tribes

    Office of Environmental Management (EM)

    Service U.S. General Services Administration GSA Solutions for Federally- Recognized Tribes Federal Acquisition Service U.S. General Services Administration 2 Overview  Customer Service Office Alaska  Support to Federally-Recognized Tribes  Additional Resources  Questions Federal Acquisition Service U.S. General Services Administration 3 GSA - Our Mission GSA's mission is to use expertise to provide innovative solutions for our customers in support of their missions and by so doing

  18. Executive Order 13423- Strengthening Federal Environmental, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental, Energy, and Transportation Management Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management It is the policy of ...

  19. SOUTHEASTERN FEDERAL POWER ALLIANCE- October 9, 2013

    Broader source: Energy.gov [DOE]

    Southeastern Federal Power Alliance meeting was held on October 9, 2013 at the Municipal Electric Authority of Georgia

  20. Planning for Solar Projects on Federal Sites

    Broader source: Energy.gov [DOE]

    Planning for the federal site solar project can begin after the solar solar pre-screening is complete.

  1. Commissioning for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Federal Facilities Commissioning for Federal Facilities Guide describes building commissioning, recommissioning, retrocommissioning, and continuous commissioning for federal facilities. PDF icon commissioning_fed_facilities.pdf More Documents & Publications Chapter 9: Commissioning the Building Guide to Operating and Maintaining EnergySmart Schools Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit

  2. Federal Acquisition Circular (FAC) 2005-68

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the June 26, 2013 Federal Register at 78 FR 38535. This FAC issued 1 interim rule. To view this rule go to Federal Register site then search by date and go to General Services Administration to find the rule https://www.federalregister.gov/articles/current.

  3. Federal Acquisition Circular 2005-49

    Broader source: Energy.gov [DOE]

    Federal Acquisition Circular (FAC) 2005-49 was issued January 24, 2011 in volume 76 FR 4188. It published one interim rule Federal Acquisition Regulation (FAR) case number 2010-016 on Public Access to Federal Awardee Performance and Integrity Information System. This rule is effective January 24, 2011. The summary of the FAC is attached.

  4. Federal Acquisition Circular 2005-56

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-56 which makes miscellaneous changes to the Federal Acquisition Regulation. The Circular was published in the Federal Register on March 2, 2012 at 77 FR 12912 and 12913.

  5. Starting low compression ratio rotary Wankel diesel engine

    SciTech Connect (OSTI)

    Kamo, R.; Yamada, T.Y.; Hamada, Y.

    1987-01-01

    The single stage rotary Wankel engine is difficult to convert into a diesel version having an adequate compression ratio and a compatible combustion chamber configuration. Past efforts in designing a rotary-type Wankel diesel engine resorted to a two-stage design. Complexity, size, weight, cost and performance penalties were some of the drawbacks of the two-stage Wankel-type diesel designs. This paper presents an approach to a single stage low compression ratio Wankel-type rotary engine. Cold starting of a low compression ratio single stage diesel Wankel becomes the key problem. It was demonstrated that the low compression single stage diesel Wankel type rotary engine can satisfactorily be cold started with a properly designed combustion chamber in the rotor and a variable heat input combustion aid.

  6. Helping Cleantech Start-ups with Employee Compensation - News Releases |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL Helping Cleantech Start-ups with Employee Compensation October 17, 2011 The Colorado Center for Renewable Energy Economic Development (CREED) at U.S. Department of Energy's National Renewable Energy Laboratory (NREL) invites cleantech entrepreneurs to attend the next event in its Entrepreneur Series. The Oct. 20 class, "How do you pay your CEO," will help cleantech entrepreneurs determine how to compensate a team, particularly when the company is short on cash. To help

  7. The MicroBooNE Experiment - Getting Started

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Getting Started on MicroBooNE Welcome to MicroBooNE! This page is designed to help new MicroBooNE collaborators find their way around the experiment and Fermilab. Table of Contents Fermilab ID, Computing Accounts, and Required Training Visas for non-US Citizens Traveling to Fermilab Housing/Hotels Getting Around Communication within the Collaboration Software Getting Help Fermilab ID, Computing Accounts, and Required Training Badging changes for non-US visitors Whether obtaining a new Fermilab

  8. PPPL physicists simulate innovative method for starting up tokamaks without

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    using a solenoid | Princeton Plasma Physics Lab physicists simulate innovative method for starting up tokamaks without using a solenoid By Raphael Rosen January 4, 2016 Tweet Widget Google Plus One Share on Facebook PPPL Scientist Francesca Poli (Photo by Elle Starkman/PPPL Office of Communications) PPPL Scientist Francesca Poli Scientists at the U.S. Department of Energy's Princeton Plasma Physics Laboratory (PPPL) have produced self-consistent computer simulations that capture the

  9. Sandia starts silicon wafer production for three nuclear weapon programs |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration starts silicon wafer production for three nuclear weapon programs Wednesday, March 25, 2015 - 3:24pm Sandia National Laboratories has begun making silicon wafers for three nuclear weapon modernization programs, the largest production series in the history of its Microsystems and Engineering Sciences Applications (MESA) complex. MESA's silicon fab in October began producing base wafers for Application-Specific Integrated Circuits for the B61-12 Life

  10. PPPL physicists simulate innovative method for starting up tokamaks without

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    using a solenoid | Princeton Plasma Physics Lab physicists simulate innovative method for starting up tokamaks without using a solenoid By Raphael Rosen January 4, 2016 Tweet Widget Google Plus One Share on Facebook PPPL Scientist Francesca Poli (Photo by Elle Starkman/PPPL Office of Communications) PPPL Scientist Francesca Poli Scientists at the U.S. Department of Energy's Princeton Plasma Physics Laboratory (PPPL) have produced self-consistent computer simulations that capture the

  11. Long pulse EBW start-up experiments in MAST

    SciTech Connect (OSTI)

    Shevchenko, V. F.; Baranov, Y. F.; Bigelow, T.; Caughman, J. B.; Diem, S.; Dukes, C.; Finburg, P.; Hawes, J.; Gurl, C.; Griffiths, J.; Mailloux, J.; Peng, M.; Saveliev, A. N.; Takase, Y.; Tanaka, H.; Taylor, G.

    2015-03-12

    Start-up technique reported here relies on a double mode conversion (MC) for electron Bernstein wave (EBW) excitation. It consists of MC of the ordinary (O) mode, entering the plasma from the low field side of the tokamak, into the extraordinary (X) mode at a mirror-polarizer located at the high field side. The X mode propagates back to the plasma, passes through electron cyclotron resonance (ECR) and experiences a subsequent X to EBW MC near the upper hybrid resonance (UHR). Finally the excited EBW mode is totally absorbed at the Doppler shifted ECR. The absorption of EBW remains high even in cold rarefied plasmas. Furthermore, EBW can generate significant plasma current giving the prospect of a fully solenoid-free plasma start-up. First experiments using this scheme were carried out on MAST [1]. Plasma currents up to 33 kA have been achieved using 28 GHz 100kW 90ms RF pulses. Recently experimental results were extended to longer RF pulses showing further increase of plasma currents generated by RF power alone. A record current of 73kA has been achieved with 450ms RF pulse of similar power. The current drive enhancement was mainly achieved due to RF pulse extension and further optimisation of the start-up scenario.

  12. Long pulse EBW start-up experiments in MAST

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Shevchenko, V. F.; Baranov, Y. F.; Bigelow, T.; Caughman, J. B.; Diem, S.; Dukes, C.; Finburg, P.; Hawes, J.; Gurl, C.; Griffiths, J.; et al

    2015-03-12

    Start-up technique reported here relies on a double mode conversion (MC) for electron Bernstein wave (EBW) excitation. It consists of MC of the ordinary (O) mode, entering the plasma from the low field side of the tokamak, into the extraordinary (X) mode at a mirror-polarizer located at the high field side. The X mode propagates back to the plasma, passes through electron cyclotron resonance (ECR) and experiences a subsequent X to EBW MC near the upper hybrid resonance (UHR). Finally the excited EBW mode is totally absorbed at the Doppler shifted ECR. The absorption of EBW remains high even inmore » cold rarefied plasmas. Furthermore, EBW can generate significant plasma current giving the prospect of a fully solenoid-free plasma start-up. First experiments using this scheme were carried out on MAST [1]. Plasma currents up to 33 kA have been achieved using 28 GHz 100kW 90ms RF pulses. Recently experimental results were extended to longer RF pulses showing further increase of plasma currents generated by RF power alone. A record current of 73kA has been achieved with 450ms RF pulse of similar power. The current drive enhancement was mainly achieved due to RF pulse extension and further optimisation of the start-up scenario.« less

  13. Technical Assistance Program: Off to a Running Start (Newsletter)

    SciTech Connect (OSTI)

    Not Available

    2012-02-01

    This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Winter 2012. Between December 2, 2011, and January 15, 2012, 46 American Indian and Alaska Native Tribes submitted applications to receive technical assistance through the program, which provides Tribes with on-the-ground technical support from DOE and National Renewable Energy Laboratory (NREL) staff to help move tribal energy efficiency and renewable energy projects forward. The applications are being considered through the Strategic Technical Assistance Response Team (START) selection process, which incorporates expert reviews and outreach to Tribes who present a need for assistance with their community-based energy efficiency and renewable energy projects. The final successful applicants will be selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with each unique project or community. At least three selected Tribes in Alaska will receive technical assistance between March and May 2012, and up to five selected Tribes in the contiguous United States will receive technical assistance between March and August 2012. During the months of START Program activity, DOE and NREL experts will work in the two locations. In Alaska, START experts will work directly with community-based project teams to analyze local energy issues and provide assistance with energy projects and cost savings initiatives. This effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide further assistance and expertise. In the lower 48 states, NREL experts will work with the selected renewable energy START projects to evaluate financial and technical feasibility and provide early development technical assistance to better position the projects for financing and construction. This on-the-ground technical assistance is part of a broader DOE-IE effort to make reliable, accurate technical information and skills-based training available to tribal communities throughout the United States. The primary goal of the START initiative, according to DOE-IE Director Tracey A. LeBeau, is to bring about the next generation of energy development in Indian Country. Through energy project planning, quality training, and technical assistance, The START program will leverage the early-stage resource characterization and pre-feasibility investments that DOE has made in Indian Country over the years, and unlock the energy resources that exist on tribal lands to help build a 21st century tribal energy economy. Working collaboratively with a select group of Tribes and Alaska Native entities, the DOE Office of Indian Energy, NREL, and the Denali Commission will empower tribal leaders to make informed energy decisions and help build capacity to bring tribal energy visions to fruition and get renewable energy projects off the ground, said LeBeau. Ultimately, these efforts will serve to further the Obama Administration and DOE's shared commitment to provide Native American and Alaska Native communities with the tools and resources they need to foster tribal energy self-sufficiency and sustainability, advancing job creation and enhancing economic competitiveness.

  14. Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook

    SciTech Connect (OSTI)

    2010-06-17

    Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

  15. 30-Day Federal Register Notice - Extension | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30-Day Federal Register Notice - Extension 30-Day Federal Register Notice - Extension Record Extension-30 Day Federal Register Notice PDF icon 30-Day Federal Register Notice - Extension More Documents & Publications 30 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Proposed - FINAL

  16. Jump start: DuPont exports its energy management program

    SciTech Connect (OSTI)

    1994-11-23

    In August 1993, DuPont launched its innovative Jump Start program, which called for managers in its 25 largest plants to carry out a 120-day crash effort to find ways to reduce energy use at their facilities. The effort produced ideas that will result in $21.5 million in energy savings over six years, exceeding DuPont`s target. It also kicked off a longer-term program the company hopes will cut as much as $300 million, or 15% from energy bills through 2000.

  17. Phase I. Lanthanum-based Start Materials for Hydride Batteries

    SciTech Connect (OSTI)

    Gschneidner, K. A.; Schmidt, F. A.; Frerichs, A. E.; Ament, K. A.

    2013-08-20

    The purpose of Phase I of this work is to focus on developing a La-based start material for making nickel-metal (lanthanum)-hydride batteries based on our carbothermic-silicon process. The goal is to develop a protocol for the manufacture of (La1-xRx)(Ni1-yMy)(Siz), where R is a rare earth metal and M is a non-rare earth metal, to be utilized as the negative electrode in nickel-metal hydride (NiMH) rechargeable batteries.

  18. Cold start characteristics of ethanol as an automobile fuel

    DOE Patents [OSTI]

    Greiner, Leonard

    1982-01-01

    An alcohol fuel burner and decomposer in which one stream of fuel is preheated by passing it through an electrically heated conduit to vaporize the fuel, the fuel vapor is mixed with air, the air-fuel mixture is ignited and combusted, and the combustion gases are passed in heat exchange relationship with a conduit carrying a stream of fuel to decompose the fuel forming a fuel stream containing hydrogen gas for starting internal combustion engines, the mass flow of the combustion gas being increased as it flows in heat exchange relationship with the fuel carrying conduit, is disclosed.

  19. From the Start: NREL Nurtures a Growing Wind Industry - Continuum

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Magazine | NREL Photo of a wind turbine nacelle bolted to a coupling device that, in turn, is connected to a large electric motor via a shaft. NREL's newest dynamometer is capable of testing wind turbines up to 5 megawatts in-capacity. The device exposes the wind turbine's drivetrain and generator-housed in the white nacelle on the left-to the loads and torques that they may experience in the field. Photo by Dennis Schroeder, NREL From the Start: NREL Nurtures a Growing Wind Industry The

  20. Measuring the Economic Impacts of Federal Investments in Research

    SciTech Connect (OSTI)

    Olson, S; Merrill, S

    2011-08-31

    Measuring the Economic Impacts of Federal Investments in Research evaluates approaches to measuring the returns on federal research investments. This report identifies new methodologies and metrics that can be developed and used for assessing returns on research across a wide range of fields (biomedical, information technology, energy, agriculture, environment, and other biological and physical sciences, etc.), while using one or more background papers that review current methodologies as a starting point for the discussion. It focuses on tools that are able to exploit available data in the relatively near term rather than on methodologies that may require substantial new data collection. Over the last several years, there has been a growing interest in policy circles in identifying the payoffs from federal agency research investments, especially in terms of economic growth, competitiveness, and jobs. The extraordinary increase in research expenditures under the American Recovery and Reinvestment Act (ARRA) of 2009 and the President'™s commitment to science and technology (S&T) funding increases going forward have heightened the need for measuring the impacts of research investments. Without a credible analysis of their outcomes, the recent and proposed increases in S&T funding may not be sustained, especially given competing claims for federal funding and pressures to reduce projected federal budget deficits. Motivated by these needs and requirements, Measuring the Economic Impacts of Federal Investments in Research reviews and discusses the use of quantitative and qualitative data to evaluate the returns on federal research and development (R&D) investments. Despite the job-focused mandate of the current ARRA reporting requirements, the impact of S&T funding extend well beyond employment. For instance, federal funding in energy research may lead to innovations that would reduce energy costs at the household level, energy imports at the national level, and greenhouse gas emissions at the global level. In principle, these benefits can be measured as a return on research investments, with appropriate consideration of time lags to research outcomes and attribution to private as well as public expenditure. With appropriate metrics, the same could be true for benefits to public health, environmental quality, and food productivity and security. Federal funding of research leads to the development of human capital that is deployed in a variety of occupations with economic and social impacts. Research also produces information that is used in formal (e.g., regulatory and judicial) and informal (e.g., firm and consumer) decision making processes. In addition to reviewing the range of work (by academics, consultants, and research agencies themselves) that has been done in measuring research outcomes and providing a forum to discuss their methods, this report also considers the different methodologies used across fields of research (e.g., agriculture and energy research) to identifies which are applicable to a range of federal S&T funding.

  1. Sandia Energy - Power Production Started on All Three SWiFT Turbines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power Production Started on All Three SWiFT Turbines Home Renewable Energy Energy SWIFT Facilities Partnership News Wind Energy News & Events Power Production Started on All Three...

  2. PP-13 Federal Power Commission | Department of Energy

    Office of Environmental Management (EM)

    3 Federal Power Commission PP-13 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission ...

  3. Federal Land Policy and Management Act of 1976 (FLPMA) | Open...

    Open Energy Info (EERE)

    Legal Document- Federal RegulationFederal Regulation: Federal Land Policy and Management Act of 1976 (FLPMA)Legal Abstract FLPMA, also called the BLM Organic Act,...

  4. Methodology for Use of Reclaimed Water at Federal Locations ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Methodology for Use of Reclaimed Water at Federal Locations Methodology for Use of Reclaimed Water at Federal Locations Fact sheet offers guidelines to help Federal agencies use ...

  5. Federal Technical Capability Program (FTCP) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Technical Capability Program (FTCP) Federal Technical Capability Program (FTCP) Vision For DOE to be a technically proficient enterprise, with federal technical personnel ...

  6. MEMORANDUM FOR JOHN M. SATTLER DIRECTOR BROOKHAVEN FEDERAL PROJECT...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    l 4 2011 MEMORANDUM FOR JOHN M. SATTLER DIRECTOR BROOKHAVEN FEDERAL PROJECT OFFICE FROM: SUBJECT: Designation of Federal Project Director and Deputy Federal Project Director for...

  7. Microsoft Word - Federal Register Response _Jan09_.doc | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Register Response Jan09.doc Microsoft Word - Federal Register Response Jan09.doc PDF icon Microsoft Word - Federal Register Response Jan09.doc More Documents & ...

  8. US DOE Federal Energy Management Program (FEMP) | Open Energy...

    Open Energy Info (EERE)

    US DOE Federal Energy Management Program (FEMP) (Redirected from Federal Energy Management Program) Jump to: navigation, search Logo: Federal Energy Management Program (FEMP) Name...

  9. US DOE Federal Energy Management Program (FEMP) | Open Energy...

    Open Energy Info (EERE)

    US DOE Federal Energy Management Program (FEMP) (Redirected from Federal Energy Management Program (FEMP)) Jump to: navigation, search Logo: Federal Energy Management Program...

  10. Denver Federal Center Solar Park | Open Energy Information

    Open Energy Info (EERE)

    Federal Center Solar Park Jump to: navigation, search Name Denver Federal Center Solar Park Facility Denver Federal Center Sector Solar Facility Type Photovoltaic Owner SunEdison...

  11. Federal Memorandum of Understanding for Hydropower | Open Energy...

    Open Energy Info (EERE)

    Federal Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland...

  12. Sustainable Federal Fleets Catalog of Services | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sustainable Federal Fleets Catalog of Services Sustainable Federal Fleets Catalog of Services Document details the Federal Energy Management Program's catalog of technical ...

  13. Community-Based Federal Environmental Justice Resource Guide...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Community-Based Federal Environmental Justice Resource Guide (EJ IWG, 2015) Community-Based Federal Environmental Justice Resource Guide (EJ IWG, 2015) The Federal Interagency ...

  14. Microsoft Word - Political Activity and the Federal Employee...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Political Activity and the Federal Employee.doc Microsoft Word - Political Activity and the Federal Employee.doc PDF icon Microsoft Word - Political Activity and the Federal ...

  15. Factors fragmenting the Russian Federation

    SciTech Connect (OSTI)

    Brown, E.

    1993-10-06

    This paper examines the factors that threaten the future of the Russian Federation (RF). The observations are based on a study that focused on eight republics: Mordova, Udmurtia, Tatarstan, Mari El, Bashkortostan, Kabardino-Balkaria, Buryatia, and Altay Republic. These republics were selected for their geographic and economic significance to the RF. Tatarstan, Bashkortostan, Udmurtia, and Mari El are located on important supply routes, such as the Volga River and the trans-Siberian railroad. Some of these republics are relatively wealthy, with natural resources such as oil (e.g., Tatarstan and Bashkortostan), and all eight republics play significant roles in the military-industrial complex. The importance of these republics to the RF contrasts to the relative insignificance of the independence-minded Northern Caucasus area. The author chose not to examine the Northern Caucasus region (except Kabardino-Balkaria) because these republics may have only a minor impact on the rest of the RF if they secede. Their impact would be minimized because they lie on the frontiers of the RF. Many Russians believe that {open_quotes}it might be best to let such a troublesome area secede.{close_quotes}

  16. FederalRegisterEaNotice.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Security Administration Federal Radiological Monitoring and Assessment Center The Federal Radiological Monitoring and Assessment Center (FRMAC) is a federal asset available on request by the Department of Homeland Security (DHS) and state and local agencies to respond to a nuclear or radiological incident. The FRMAC is an interagency organization with representation from the NNSA, the Department of Defense (DOD), the Environmental Protection Agency (EPA), the Department of Health and Human

  17. Federal Energy and Water Management Awards 2014

    Energy Savers [EERE]

    of Energy Federal Energy and Manufacturing Workforce Training Programs Federal Energy and Manufacturing Workforce Training Programs Looking for opportunities in your area? Check out these federally funded programs supporting energy and manufacturing related workforce training programs. Funded by the National Science Foundation, the Department of Labor and the Department of Energy these programs provide workforce and training opportunities. Click on a grey circle on the map or filter by

  18. Federal, Contractor, or Subcontractor | Department of Energy

    Energy Savers [EERE]

    Department of Energy Technology Deployment Pilot: Exterior Solid State Lighting Federal Technology Deployment Pilot: Exterior Solid State Lighting Presentation-given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting-provides an overview of the U.S. Department of Energy's Solid-State Lighting Program and an exterior solid-state lighting federal technology deployment pilot project. PDF icon fupwg_fall11_mccullough.pdf More Documents & Publications FEMP Exterior

  19. Federal Register Notice: National Nuclear Security Administration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New Mexico (SNLNM) Federal Register Notice: National Nuclear Security Administration Site-Wide Environmental Impact Statement for Sandia National Laboratories, New Mexico (SNL...

  20. Federal Utility Partnership Working Group Purpose, Policies,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Group Purpose, Policies, and Operations Draft document (last updated in 2010) discusses the purpose, policies, and operations of the Federal Utility Partnership Working Group. ...

  1. NOTIFICATION AND FEDERAL EMPLOYEE ANTIDISCRIMINATION AND RETALIATION...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACT OF 2002 Public Law PDF icon NOTIFICATION AND FEDERAL EMPLOYEE ANTIDISCRIMINATION AND RETALIATION ACT OF 2002 More Documents & Publications ENERGY POLICY ACT OF 2005 ...

  2. Federal Energy Management Program (FEMP) Training Resources ...

    Open Energy Info (EERE)

    Management Program (FEMP) Training Resources Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Federal Energy Management Program (FEMP) Training Resources AgencyCompany...

  3. Potential Hydroelectric Development at Existing Federal Facilities...

    Open Energy Info (EERE)

    Potential Hydroelectric Development at Existing Federal Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Potential Hydroelectric Development at...

  4. Federal Acquisition Circular 2005-54

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of FAR amendments published in today's Federal Register (76 FR 68027, November 2, 2011).

  5. Proposed Agency Information Collection: Federal Register Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Collection: Federal Register Notice Volume 76, No. 195 - Oct. 7, 2011 The Department of Energy (DOE) invites public comment on DOE's request the Office of Management and ...

  6. Federal Energy Management Program (FEMP) Technical Assistance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Industry Interactive Procurement System (IIPS) Federal Energy and Water Management Awards: Frequently Asked Questions Home Energy Score Assessor ...

  7. Federal Acquisition Circular 2005-47

    Broader source: Energy.gov [DOE]

    Federal Acquisition Circular 2005-47 was issued December 13, 2010, 75 FR 77721. It concludes 7 separate rulemakings which are described in the attached summary sheet.

  8. Determining Price Reasonableness in Federal ESPCs

    Broader source: Energy.gov [DOE]

    Document reports the findings and implementation recommendations of the Price Reasonableness Working Group to the Federal Energy Savings Performance Contract (ESPC) Steering Committee.

  9. ETrans Federal Permitting Transmission Tracking System | Open...

    Open Energy Info (EERE)

    More recently, the Rapid Response Team for Transmission (RRTT) was created, which extends activity outside of federal lands. This website hosts a tracking system and search feature...

  10. Federal Acquisition Circular 2005-48

    Broader source: Energy.gov [DOE]

    Federal Acquisition Circular 2005-48 was issued December 30, 2010, 75 FR 82565. It concludes 4 separate rulemakings which are described in the attached summary sheet.

  11. Designation of Environmental Management Federal Project Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Federal Project Director for Brookhaven National Laboratory by sattler DesignationofEMFedProjDir-BNL-SattlerEM.pdf -- PDF Document, 240 KB ID: NA Type:...

  12. Designation of Environmental Management Federal Project Director...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Management Federal Project Director for Separations Process Research Unit by feinberg DesignationofEMFedProjDir-SeparationsProcessResearchUnit-FeinbergEM.pdf -- PDF...

  13. Telephone. Federal Communications Commission. Marlene H. Dortch...

    Office of Environmental Management (EM)

    ... (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Correction. ... DoD, GSA, and NASA adopted as final, with changes, an interim rule amending the Federal ...

  14. Federal Biomass Activities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biomass Activities Federal Biomass Activities Statutory and executive order requirements for Bioproducts and Biofuels PDF icon federalbiomassactivities.pdf More Documents & ...

  15. Federal Utility Partnership Working Group Meeting Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sparks and their team. * FUPWG Steering Committee Meeting * FUPWG Meeting Agenda * LogisticsAnnouncements * Looking for hosts for Future FUPWG Meetings Announcements Federal ...

  16. Federal Acquisition Circular 2005-61

    Broader source: Energy.gov [DOE]

    Attached for your information is a list and summary of FAR amendments published in the September 13, 2012 Federal Register at 77 FR 56738.

  17. Federal Energy and Water Management Awards 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Greg Leifer U.S. Department of Health and Human Services National Institutes of Health Bethesda, Maryland Greg Leifer is the federal energy program manager for the National ...

  18. Gulf of Mexico Federal Offshore Production

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Includes Federal Offshore Alabama, Louisiana, and Texas. See Definitions, Sources, and Notes link above for more information on this table. Release Date: 12...

  19. Environmental Justice and Federal Facilities: Recommendations...

    Energy Savers [EERE]

    ... with the anticipated level of activity, and ... cleanup of hazardous waste at federal facilities on low-income communities, ... to DOE's Environmental Management Office. ...

  20. Federal Government Energy Management Conservation Programs Reports...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    L. No. 95-619), as amended, and provide information on energy consumption in federal ... Energy management and energy consumption requirements of section 543 of NECPA, as amended ...

  1. Federal Register Notices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Register Notice, Volume 78, No. 45 - March 7, 2013 Application from Shell Energy to export electric energy to Mexico. Federal Register Notice. February 21, 2013 Request for...

  2. Federal Register Notices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Register Notice, Volume 79, No. 87 - May 6, 2014 Application from Hunt Electric to export electric energy to Mexico. Federal Register Notice. April 28, 2014 Application for...

  3. Federal Register Notices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Register Notice Volume 77, No. 38 - Feb. 27, 2012 Application from NRG Power Mktg. to export electric energy to Mexico. Federal Register Notice. February 27, 2012 Application...

  4. Federal Register Notices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice Volume 73, No. 227 - Nov. 28, 2008 Application from Powerex Corporation to export electric energy to Mexico. Federal Register Notice Vol 73 No 227 September 19, 2008...

  5. Federal Acquisition Circular 2005-62

    Broader source: Energy.gov [DOE]

    Attached for your information is a list and summary of FAR amendments published in the November 20, 2012 Federal Register at 77 FR 69714.

  6. THE FEDERAL ENERGY ADMINISTRATION By Roger Anders

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... and Production Act, required the Federal Energy Administration to improve data collection by the creation of an assistant administrator for energy information and analysis. ...

  7. Alaska Federation of Natives Annual Convention

    Broader source: Energy.gov [DOE]

    The Alaska Federation of Natives (AFN) Convention is the largest representative annual gathering in the United States of any Native peoples.

  8. SUPPLEMENT TO LOAN GUARANTEE SOLICITATION ANNOUNCEMENT FEDERAL...

    Energy Savers [EERE]

    FEDERAL LOAN GUARANTEES FOR ADVANCED NUCLEAR ENERGY PROJECTS Solicitation Number: DE-SOL- DE-SOL-0007791 OMB Control Number: 1910-5134; OMB Expiration Date 11302016...

  9. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    ... and federal monitoring of DOE nuclear facilities. 1 It provides a primer on the safety basis development and ... Criticality Radiation and Hazardous Waste ...

  10. Report: President's Energy Efficiency Contracting for Federal...

    Broader source: Energy.gov (indexed) [DOE]

    released on December 19 applauds the federal government's success in awarding energy-saving contracts that will save taxpayer dollars. Signed by President Obama in December...

  11. Federal Utility Partnership Working Group - Utility Interconnection...

    Energy Savers [EERE]

    Federal Utility Partnership Working Group (FUPWG) meeting-discusses solarphotovoltaic (PV) projects to connect with utility in California and their issues. fupwgfall12jewell.pd...

  12. Assisting Federal Facilities with Energy Conservation Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Federal Energy Management Program (FEMP) provides project assistance through the AFFECT funding opportunity. AFFECT provides grants for the development of capital projects to ...

  13. Electricity Advisory Committee - Federal Register Notices | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Committee Notice of Open Meeting March 17 and 18, 2016: Federal Register Notice Volume 81, No. 29 - February 12, 2016 This notice announces an open meeting of the ...

  14. Federal Acquisition Circular 2005-59

    Broader source: Energy.gov [DOE]

    Attached for your information is a list of FAR amendments published in the May 10, 2012 Federal Register at 77 FR 27546.

  15. Identifying Renewable Energy Projects for Federal Agencies |...

    Broader source: Energy.gov (indexed) [DOE]

    projects that can help federal agencies meet their 30% renewable electricity by 2025 target. This research is summarized on this page. Renewable Energy Markets The size of the...

  16. 2010 Northwest Federal Market Assessment Report

    SciTech Connect (OSTI)

    Scanlon, Tim; Sandusky, William F.

    2011-09-01

    The primary intent of this market assessment is to provide insights on the effectiveness of current energy efficiency and renewable energy program offerings available to Federal sites in the region. The level of detail, quality and currency of the data used in this market assessment varies significantly by Federal agency and energy efficiency service provider. Limited access to some Federal sites, limited availability of key points of contact, time/resource constraints, and other considerations limited the total number of Federal agencies and energy efficiency service providers participating in the survey.

  17. Federal Acquisition Circular 2005-60

    Broader source: Energy.gov [DOE]

    Attached for your information is a list and summary of FAR amendments published in the July 26, 2012 Federal Register at 77 FR 44045.

  18. Information Security: Coordination of Federal Cyber Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Security: Coordination of Federal Cyber Security Research and Development GAO recommends that the Office of Science and Technology Policy establish timelines for ...

  19. Executive Order 13514: Comprehensive Federal Fleet Management...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Handbook offers guidance on meeting the fleet management requirements outlined in section 12 of Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic ...

  20. Application for Federal Assistance SF-424

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Number: 4040-0004 Expiration Date: 8312016 * 1. Type of Submission: * 2. Type of Application: * 3. Date Received: 4. Applicant Identifier: 5a. Federal Entity Identifier: 5b. ...

  1. Federal Energy Management Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The U.S. Department of Energy's Federal Energy Management Program works with key ... Develop operations and maintenance plans Change behavior to be more sustainable Meter ...

  2. Federal Sector Renewable Energy Project Implementation: ""What...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Sector Renewable Energy Project Implementation: ""What's Working and Why Presentation by Robert Westby, National Renewable Energy Laboratory, at the Waste-to-Energy Using ...

  3. AVTA: 2010 Volkswagon Golf Diesel Start-Stop Testing Results

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2010 Volkswagon Golf Diesel vehicle with stop-start technology. Baseline data, which provides a point of comparison for the other test results, was collected at two different research laboratories. Baseline and other data collected at Idaho National Laboratory is in the attached documents. Baseline and battery testing data collected at Argonne National Laboratory is available in summary and CSV form on the Argonne Downloadable Dynometer Database site (http://www.anl.gov/energy-systems/group/downloadable-dynamometer-databas...). Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

  4. AVTA: 2010 Mazda 3 Hatchback Start-Stop Testing Results

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following reports describe results of testing done on a 2010 Mazda3 hatchback with stop-start technology. Baseline and other data collected at Idaho National Laboratory is in the attached documents. Baseline and battery testing data collected at Argonne National Laboratory is available in summary and CSV form on the Argonne Downloadable Dynometer Database site (http://www.anl.gov/energy-systems/group/downloadable-dynamometer-databas...). Taken together, these reports give an overall view of how this vehicle functions under extensive testing.

  5. Method of forming and starting a sodium sulfur battery

    DOE Patents [OSTI]

    Paquette, David G.

    1981-01-01

    A method of forming a sodium sulfur battery and of starting the reactive capability of that battery when heated to a temperature suitable for battery operation is disclosed. An anodic reaction zone is constructed in a manner that sodium is hermetically sealed therein, part of the hermetic seal including fusible material which closes up openings through the container of the anodic reaction zone. The hermetically sealed anodic reaction zone is assembled under normal atmospheric conditions with a suitable cathodic reaction zone and a cation-permeable barrier. When the entire battery is heated to an operational temperature, the fusible material of the hermetically sealed anodic reaction zone is fused, thereby allowing molten sodium to flow from the anodic reaction zone into reactive engagement with the cation-permeable barrier.

  6. Dual-Fuel Truck Fleet: Start-Up Experience

    SciTech Connect (OSTI)

    NREL

    1998-09-30

    Although dual-fuel engine technology has been in development and limited use for several years, it has only recently moved toward full-scale operational capability for heavy-duty truck applications. Unlike a bifuel engine, which has two separate fuel systems that are used one at a time, a dual-fuel engine uses two fuel systems simultaneously. One of California's South Coast Air Quality Management District (SCAQMD) current programs is a demonstration of dual-fuel engine technology in heavy-duty trucks. These trucks are being studied as part of the National Renewable Energy Laboratory's (NREL's) Alternative Fuel Truck Program. This report describes the start-up experience from the program.

  7. Method for starting operation of a resistance melter

    DOE Patents [OSTI]

    Chapman, Christopher Charles

    1977-01-01

    A method for starting the operation of a resistance furnace, where heating occurs by passing a current through the charge between two furnace electrodes and the charge is a material which is essentially electrically nonconductive when in a solid physical state but which becomes more electrically conductive when in a molten physical state, by connecting electrical resistance heating wire between the furnace electrodes, placing the wire in contact with the charge material between the electrodes and passing a current through the wire to heat the wire to a temperature sufficient to melt the material between the furnace electrodes so that as the material melts, current begins to pass between the electrodes through the melted material, further heating and melting more material until all current between the electrodes passes through the charge material without the aid or presence of the resistance element.

  8. START Program for Renewable Energy Project Development Assistance – Round Three Application

    Broader source: Energy.gov [DOE]

    Download the application for the START Program for Renewable Energy Project Development Assistance–Round Three.

  9. Federal Utility Partnership Working Group Meeting: Washington Update

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy; DOE; Federal Energy Management Program; FEMP; Federal Utility Partnership Working Group; FUPWG; Spring 2012

  10. National Environmental Justice Advisory Council Federal Facilities Working Group Report

    Broader source: Energy.gov [DOE]

    Environmental Justice and Federal Facilities: recommendations for improving stakeholder relations between federal facilities and environmental justice communities, October 2004

  11. Transmittal Letter for Final Federal Renewable Energy Guidance

    Broader source: Energy.gov [DOE]

    Letter to federal energy officials summarizing the new Federal Renewable Energy Guidance being distributed in accordance with Executive Order 13423.

  12. Office of Federal Procurement (OFPP) Determination of Executive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Procurement (OFPP) Determination of Executive Compensation Benchmark Amount for ... Office of Federal Procurement (OFPP) Determination of Executive Compensation Benchmark ...

  13. Southeastern Federal Power Alliance Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southeastern Federal Power Alliance » Southeastern Federal Power Alliance Meetings Southeastern Federal Power Alliance Meetings Meeting Documents Available for Download April 12, 2016 Southeastern Federal Power Alliance Meetings SOUTHEASTERN FEDERAL POWER ALLIANCE - April 12, 2016 Southeastern Federal Power Alliance meeting was held on April 12, 2016 in the Sam Nunn Federal Building, 61 Forsyth Street SW, Atlanta, Georgia. Documents Available for Download September 29, 2015 SOUTHEASTERN FEDERAL

  14. Bioproducts in the Federal Bioeconomy Portfolio Webinar

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bioproducts in the Federal Bioeconomy Portfolio October 26, 2015 Nichole Fitzgerald Bioenergy Technologies Office (BETO) 2 | Bioenergy Technologies Office Agenda * Introduction and BETO Overview - Erica Qiao, BCS, Incorporated - Nichole Fitzgerald, Technology Manager, Bioenergy Technologies Office * Bioproducts in the Federal Bioeconomy Portfolio - Nichole Fitzgerald - Dennis Hall, Director, The Ohio State University Bioproducts Innovation Center (OBIC) - Kate Lewis, Deputy Program Manager, U.S.

  15. Catalog of Federal Domestic Assistance (CFDA)

    Broader source: Energy.gov [DOE]

    As discussed in Policy Flash 2010-82, the Federal Funding and Transparency Act of 2006 (FFATA) is not being implemented for first tier subawardees. The purpose of FFATA is to provide total transparency to the public on how appropriated dollars are spent by the Federal Government.

  16. Federal Radiological Monitoring and Assessment Center

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-12-02

    To establish Department of Energy (DOE) policy, procedures, authorities, and requirements for the establishment of a Federal Radiological Monitoring and Assessment Center (FRMAC), as set forth in the Federal Radiological Emergency Response Plan (FRERP). This directive does not cancel another directive. Canceled by DOE O 153.1.

  17. Federal Acquisition Circular 2005-42

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date.

  18. Federal Register | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Register NNSA Updates Export Control Regulation WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) updated the Federal rule (10 CFR Part 810, or Part 810) that regulates the export of unclassified nuclear technology and assistance. The final rule was published in the Federal Register on Feb. 23 and will go into effect on

  19. Federal Acquisition Circular (FAC) 2005-76

    Broader source: Energy.gov [DOE]

    Attached for your information is a brief summary of Federal Acquisition Regulation (FAR) amendments, published in the July 25, 2014 Federal Register at 79 FR 43574. FAC 2005-76 issued 2 final rules, 1 interim rule and 1 technical amendment.

  20. 30-Day Federal Register Notice - Proposed | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30-Day Federal Register Notice - Proposed 30-Day Federal Register Notice - Proposed Proposed Agency Information Collection PDF icon 30-Day Federal Register Notice - Proposed More Documents & Publications 30 Day Federal Register Notice Proposed - FINAL 30 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Extension

  1. Credibility and trust in federal facility cleanups

    SciTech Connect (OSTI)

    Raynes, D.B.

    1995-12-01

    The most important indicator of a well-managed site cleanup effort may no longer be funding or scientific expertise. While support for federal facility cleanup has included appropriations of more than $10 billion annually, these expenditures alone are unlikely to assure progress toward environmental remediation. {open_quotes}Trust{close_quotes} is now overwhelmingly mentioned as a prerequisite for progress with site cleanup in DOE`s weapons complex. In part, federal budget deficits are forcing participants to focus on factors that build consensus and lead to cost-effective cleanup actions. In some cases, the stakeholders at cleanup sites are making efforts to work cooperatively with federal agencies. A report by 40 representatives of federal agencies, tribal and state governments, associations, and others developed recommendations to create a {open_quotes}new era of trust and consensus-building that allows all parties to get on with the job of cleaning up federal facilities in a manner that reflects the priorities and concerns of all stakeholders.{close_quotes} Changes are underway affecting how federal agencies work with federal and state regulators reflecting this concept of shared responsibility for conducting cleanup. This paper addresses these changes and provides examples of the successes and failures underway.

  2. Promoting greater Federal energy productivity [Final report

    SciTech Connect (OSTI)

    Hopkins, Mark; Dudich, Luther

    2003-03-05

    This document is a close-out report describing the work done under this DOE grant to improve Federal Energy Productivity. Over the four years covered in this document, the Alliance To Save Energy conducted liaison with the private sector through our Federal Energy Productivity Task Force. In this time, the Alliance held several successful workshops on the uses of metering in Federal facilities and other meetings. We also conducted significant research on energy efficiency, financing, facilitated studies of potential energy savings in energy intensive agencies, and undertook other tasks outlined in this report.

  3. Determining Price Reasonableness in Federal ESPCs

    SciTech Connect (OSTI)

    Shonder, J.A.

    2005-03-08

    This document reports the findings and implementation recommendations of the Price Reasonableness Working Group to the Federal ESPC Steering Committee. The working group was formed to address concerns of agencies and oversight organizations related to pricing and fair and reasonable price determination in federal energy savings performance contracts (ESPCs). This report comprises the working group's recommendations and is the proposed draft of a training curriculum on fair and reasonable price determination for users of federal ESPCs. The report includes: (1) A review of federal regulations applicable to determining price reasonableness of federal ESPCs (section 2), (2) Brief descriptions of the techniques described in Federal Acquisition Regulations (FAR) 15.404-1 and their applicability to ESPCs (section 3), and (3) Recommended strategies and procedures for cost-effectively completing price reasonableness determinations (sections 4). Agencies have struggled with fair and reasonable price determinations in their ESPCs primarily because this alternative financing vehicle is relatively new and relatively rare in the federal sector. The methods of determining price reasonableness most familiar to federal contracting officers (price competition based on the government's design and specifications, in particular) are generally not applicable to ESPCs. The regulatory requirements for determining price reasonableness in federal ESPCs have also been misunderstood, as federal procurement professionals who are inexperienced with ESPCs are further confused by multiple directives, including Executive Order 13123, which stresses life-cycle cost-effectiveness. Uncertainty about applicable regulations and inconsistent practice and documentation among agencies have fueled claims that price reasonableness determinations have not been sufficiently rigorous in federal ESPCs or that the prices paid in ESPCs are generally higher than the prices paid for similar goods and services obtained through conventional procurements. While claims of excessive prices are largely unsubstantiated and based on anecdotal evidence, the perception that there is a problem is shared by many in the ESPC community and has been noted by auditors and oversight organizations. The Price Reasonableness Working Group determined that a more formal emphasis on FAR 15.404-1 in the ESPC process could remove much of the doubt about price reasonableness determinations. The working group's recommended consensus policy on price reasonableness stresses the price analysis techniques described in the FAR that are applicable to ESPCs and includes guidance for agencies use of these techniques in determining price reasonableness for their ESPC delivery orders. The recommended policy and guidance, if communicated to federal ESPC stakeholders, can ensure that agencies will comply with the FAR in awarding ESPCs, obtain fair and reasonable prices and best value for the government, and follow procedures that provide auditable documentation of due diligence in price reasonableness determinations.

  4. Environmental enforcement of federal agencies: A struggle for power under the New Federalism. Master's thesis

    SciTech Connect (OSTI)

    Surver, R.E.

    1990-01-01

    The challenge to Federalism presented by the new wave of environmental statutes is, while not unique in our history, a significant strain on state and federal relations. Behind this tension is the question of who should enforce these laws, especially when the violator is a Federal agency. Traditionally Federal agencies have been free to perform their diverse missions without restraint either from other Federal agencies or the states. This freedom has led to abuse in the arena of environmental compliance. Recent congressional hearings concerning amendments to the Resource Conservation and Recovery Act saw a congressional feeding frenzy over what was termed the abominable mess of federal facility environmental compliance. The obvious anger and frustration directed toward federal agencies, including the Environmental Protection Agency (EPA), by representatives of the states is a clear indicator of the extent of the problem and also a catalyst for an ill-conceived and dangerous legislative fix.

  5. Federal Energy Management Program News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Energy Management Program News Federal Energy Management Program News The Federal Energy Management Program (FEMP) publishes news about training opportunities, new documents and online tools, award winners, events, and more. May 5, 2016 Federal Energy Management Program News First Thursday Seminar to Feature Roundtable of Federal Leaders The U.S. Department of Energy's Federal Energy Management Program (FEMP) will present Federal Thought Leaders Roundtable, a First Thursday Seminar

  6. Notices and Rules Related to Federal Energy Management | Department of

    Energy Savers [EERE]

    Energy Laws & Requirements » Notices and Rules Related to Federal Energy Management Notices and Rules Related to Federal Energy Management The U.S. Department of Energy (DOE) is required by law to establish and periodically update mandatory federal energy-efficiency requirements. DOE's Federal Energy Management Program (FEMP) issues notices and rules related to federal energy management, which include new federal commercial and residential buildings, federal procurement of

  7. Federal Register Notice For Electricity Advisory Committee -...

    Broader source: Energy.gov (indexed) [DOE]

    This notice announces a meeting of the Electricity Advisory Committee (EAC). The Federal Advisory Committee Act (Pub. L. 92-463, 86 Stat. 770) requires that public notice of this...

  8. Financing for Federal Utility Energy Service Contracts

    Broader source: Energy.gov [DOE]

    Financing is a significant portion of utility energy service contract (UESC) costs. Experience shows several things the federal government can do to get the best value by reducing UESC financial transaction costs and interest.

  9. Gulf of Mexico Federal Offshore Production

    Gasoline and Diesel Fuel Update (EIA)

    Federal Offshore Gulf of Mexico production volumes are presented as a separate data series beginning in 2001. Production data for the Gulf of Mexico for years prior to 2001 are...

  10. Metering in Federal Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The U.S. Department of Energy is required by the Energy Policy Act of 2005 and Executive Order 13693 to establish guidelines for agencies to meter their federal buildings for ...

  11. From The Washington Post's Federal Diary:

    National Nuclear Security Administration (NNSA)

    The Washington Post's Federal Diary: Merit Pay in a Nuclear Test Project By Stephen Barr ... and Kane said he expects changes will be made to the system during its five-year test run. ...

  12. Organization of Chinese Americans Federal Leadership Training

    Broader source: Energy.gov [DOE]

    The Organization of Chinese Americans (OCA) will hold its Federal Leadership Training (FLT) on July 18-19, 2013, during its National Convention in Washington, D.C.  The theme of this year’s...

  13. Energy Goals and Standards for Federal Government

    Broader source: Energy.gov [DOE]

    Executive Order 13514, signed in October 2009, created a series of new requirements aimed at increasing the sustainability of all federal agencies. To help achieve these goals, the Executive Order...

  14. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and recycling-type pump, works properly over the long term. Effective operations and maintenance plans help ensure federal equipment, such as this water recovery- and recycling-typ...

  15. Federal Utility Partnership Working Group Industry Commitment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Utility Energy Service Contracts Contacts for Federal Utility Energy Service Contracts FEMP Contacts Tracy Logan U.S. Department of Energy 202-431-7601 See all UESC contacts

  16. Utility Energy Service Contracts for Federal Agencies

    Broader source: Energy.gov [DOE]

    Utility Energy Service Contracts (UESCs) allow federal agencies to take advantage of energy management services offered by their serving utilities including energy- and water-efficiency improvements, renewable energy, and demand-reduction.

  17. Federal Incentives for Wind Power (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-05-01

    This fact sheet describes the federal incentives available as of April 2013 that encourage increased development and deployment of wind energy technologies, including research grants, tax incentives, and loan programs.

  18. Water Environment Federation's Annual Technical Exhibition and...

    Broader source: Energy.gov (indexed) [DOE]

    26, 2015 8:30AM CDT to September 30, 2015 5:00PM CDT WEFTEC, the Water Environment Federation's Annual Technical Exhibition and Conference, is the biggest meeting of its kind in...

  19. 2014 National Small Business Federal Contracting Summit

    Broader source: Energy.gov [DOE]

    2014 National Small Business Federal Contracting Summit - DC Summer Conference presented jointly by the U.S. Women's Chamber of Commerce and the American Small Business Chamber of Commerce /...

  20. Federal Register Notices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Register Notice Volume 76, No. 14 - Jan. 21 - 2011 Application of Intercom Energy, Inc to export electric energy to Mexico. Federal Register Notice Vol 76 No 14 January 21, 2011...

  1. Geothermal heat pumps for federal buildings

    SciTech Connect (OSTI)

    1999-09-02

    Geothermal heat pumps (GHPs) can provide significant energy savings to a wide range of Federal facilities. GHP equipment can be obtained and installed at no up-front cost through Energy Savings Performance Contracts (ESPCs) through energy service companies (ESCOs).

  2. Federal Sector Renewable Energy Project Implementation: "What...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Sector Renewable Energy Project Implementation: "What's Working and Why" Implementation: What s Working and Why DOD-DOE Waste-to- Energy and Fuel Cell Workshop January 13, ...

  3. Federal Actions to Address Impacts of Uranium

    Office of Legacy Management (LM)

    Federal Actions to Address Impacts of Uranium Contamination in the Navajo Nation 2014 Page | i TABLE OF CONTENTS Executive Summary ....................................................................................................................... 1 Introduction .................................................................................................................................... 2 Summary of Work Completed 2008-2012

  4. OSDBU Federal Contracting Town Hall Meeting

    Broader source: Energy.gov [DOE]

    In June of 2015, John Hale III, Director of the Office of Small and Disadvantaged Business Utilization, served as the moderator for the Federal Contracting Town Hall Meeting during the CelebrAsian...

  5. Federal Acquisition Circular (FAC) 2005-55

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of FAR amendments published in the Federal Register (77 FR 33405, January 3, 2012) and a January 11, 2012 Correction Notice stating the applicability date for Item V is January 17, 2012.

  6. First Annual Federal STEM Volunteer Fair

    Broader source: Energy.gov [DOE]

    Location:  1000 Independence Ave, Washington, DC 20585- DOE Forrestal AuditoriumAttendees:  All interested federal workersPOCs: AnneMarie Horowitz (ED), and Joshua Sneideman (EERE)Website: http:/...

  7. Federal Financing Programs for Clean Energy

    Broader source: Energy.gov [DOE]

    Federal Financing Programs for Clean Energy is a resource guide to U.S. government programs that support the development of clean energy projects in the U.S. and abroad.

  8. Guide on Federal Employee Occupational Medical Programs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-12-01

    This Guide supplements the requirements and responsibilities specified in DOE O 341.1, Federal Employee Health Services, dated 12-1-03. This Guide provides preferred implementing methods and procedures. Canceled by DOE G 341.1-1A.

  9. Federal offshore statistics: leasing - exploration - production - revenue

    SciTech Connect (OSTI)

    Essertier, E.P.

    1984-01-01

    Federal Offshore Statistics is a numerical record of what has happened since Congress gave authority to the Secretary of the Interior in 1953 to lease the Federal portion of the Continental Shelf for oil and gas. The publication updates and augments the first Federal Offshore Statistics, published in December 1983. It also extends a statistical series published annually from 1969 until 1981 by the US Geological Survey (USGS) under the title Outer Continental Shelf Statistics. The USGS collected royalties and supervised operation and production of minerals on the Outer Continental Shelf (OCS) until the Minerals Management Service (MMS) took over these functions in 1982. Statistics are presented under the following topics: (1) highlights, (2) leasing, (3) exploration and development, (4) production and revenue, (5) federal offshore production by ranking operator, 1983, (6) reserves and undiscovered recoverable resources, and (7) oil pollution in the world's oceans.

  10. Federal Utility Partnership Working Group Industry Commitment

    Broader source: Energy.gov [DOE]

    Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of...

  11. EV Everywhere Logo Contest Federal Register Notice

    Broader source: Energy.gov [DOE]

    This is a copy of the notice submitted to the Federal Register for the EV Everywhere logo contest. This document, concerning the EV Everywhere logo contest is an action issued by the Department of...

  12. Federal Prison Industries-Requirement for Market

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WWVv .acQnet.govfarlF ACfac200 1-21.i2Qf Effective Date: March 26, 2004 Federal Prison Industries-Requirement for Market 023) This interira rule amends FAR parts 8, Required...

  13. Federal Energy Management Program Technical Assistance

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) offers technical assistance to help agencies identify energy-efficiency and renewable energy technologies and successfully implement them in their buildings and fleets.

  14. Federal Energy Management: Helping Agencies Achieve Savings ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    agencies shift their behavior to help save energy and resources now and for the long-term. ... and expertise FEMP offers to help federal agencies achieve their energy management goals. ...

  15. Federal Staffing Guide for Project Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-03

    This Guide provides an approach to determining the appropriate level and type of federal personnel needed to effectively plan, direct, and oversee project execution. Superseded by DOE G 413.3-19 Admin Chg 1.

  16. NREL: Technology Deployment - Federal Agency Technical Assistance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Federal Agency Technical Assistance NREL supports various federal agencies, including the U.S. Department of Energy (DOE), U.S. Department of Defense, and others by providing technical and project assistance, training, and resources to help meet and exceed energy and environmental targets. National Park Service From Prison Cells to Solar Cells: Alcatraz Island Goes Green U.S. Department of Energy As a DOE laboratory, NREL works hand-in-hand with the DOE to help shape, execute, and evaluate

  17. Federal Contracting Officers Guidebook | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contracting Officers Guidebook Federal Contracting Officers Guidebook Presentation-given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting-provides information on utility energy services contract (UESC) documents and templates. PDF icon fupwg_spring12_feedback.pdf More Documents & Publications UESC Contracting Guide Utility Energy Service Contract Guide: A Resource for Contracting Officers Working on UESC Projects UESC Frequently Asked Questions Panel Discussion

  18. Federal Project Facilitators | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Facilitators Federal Project Facilitators The following are U.S. Department of Energy (DOE) approved project facilitators who are required under the DOE indefinite-delivery, indefinite-quantity contract to develop federal energy savings performance contracts. Name Agencies Served Steve Dunnivant All agencies Shellie Feather All agencies Bruce Forsberg All agencies David Frank All agencies Timi Goebel All agencies Chris Halpin All agencies Mike Holda All agencies Coder Myers All agencies

  19. Certified Federal Project Directors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Career Development (PMCDP) » Certified Federal Project Directors Certified Federal Project Directors May 4, 2016 PDF icon List of Certified FPDs Key Resources PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates Important Career Development Resources PMCDP Curriculum Learning Map PMCDP Training Schedule PMCDP Certification and Equivalency Guidelines Project Management Earned Value Management Career Development (PMCDP) FPD Eligibility Training Schedule FPD

  20. ADR Policy Federal Register | Department of Energy

    Energy Savers [EERE]

    ADR Policy Federal Register ADR Policy Federal Register SUMMARY: On October 24, 1995, the Department of Energy (DOE) published an interim Statement of Policy on Alternative Dispute Resolution (ADR) (60 FR 54482) to further its commitment to the use of ADR for resolving issues in controversy in a fair, timely, and cost efficient manner, and to comply with the Administrative Dispute Resolution Act (ADRA), 5 U.S.C. 571 et seq. Today, DOE issues a revised Statement of Policy on Alternative Dispute

  1. Federal Building Benchmarking Guidance - August 2014 Update

    Energy Savers [EERE]

    Federal Building Energy Use Benchmarking Guidance August 2014 Update Use of Energy and Water Efficiency Measures in Federal Buildings (42 U.S.C. § 8253[f]) United States Department of Energy Washington, DC 20585 1 I. Background A. Authority - Benchmarking Requirements Section 432 of the Energy Independence and Security Act of 2007 (EISA) requires the Secretary of the United States Department of Energy (DOE) to select or develop a building energy use benchmarking system and to issue guidance

  2. Federal Acquisition Circular 2005-43

    Broader source: Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular PAC) 2005-43 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has five rules (three final and two interim). Attached is a short overview of the rules to include its effective date and applicability date. Note in particular items I (Government Property), I11 (Recovery Act Subcontract Reporting Procedures), and IV (Clarification of Criteria for Sole Source Awards to Service Disabled Veteran-Owned Small Business Concerns).

  3. Federal Register Notice for the Waste Determination

    Office of Environmental Management (EM)

    and Regulations | Department of Energy Register / Vol. 71, No. 189 / Friday, September 29, 2006 / Rules and Regulations Federal Register / Vol. 71, No. 189 / Friday, September 29, 2006 / Rules and Regulations An article on rules and regulations for enacting specific laws. PDF icon Federal Register / Vol. 71, No. 189 / Friday, September 29, 2006 / Rules and Regulations More Documents & Publications PSH-12-0117 - In the matter of Personnel Security Hearing Inspection Report: IG-0464

  4. Federal Reporting Recipient Information | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    and Regulations | Department of Energy An article on rules and regulations for enacting specific laws. PDF icon Federal Register / Vol. 71, No. 189 / Friday, September 29, 2006 / Rules and Regulations More Documents & Publications PSH-12-0117 - In the matter of Personnel Security Hearing Inspection Report: IG-0464 Vacancy Announcement

    8, 1999 Federal Register Notice, Final rule for 10 CFR part 850, CBDPP The Department of Energy (DOE) published a final rule to establish a chronic

  5. Contact and Stress Anisotropies in Start-Up Flow of Colloidal...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contact and Stress Anisotropies in Start-Up Flow of Colloidal Suspensions Authors: Martys, N.S., Lootens, D., George, W., and H Spatiotemporal correlations in start-up flows of...

  6. Start-up Plan for Plutonium-238 Production for Radioisotope Power...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Start-up Plan for Plutonium-238 Production for Radioisotope Power System (Report to Congress - June 2010) Start-up Plan for Plutonium-238 Production for Radioisotope Power System ...

  7. Property:OpenEI/UtilityRate/StartDate | Open Energy Information

    Open Energy Info (EERE)

    StartDate Jump to: navigation, search This is a property of type Date. Name: Start Date Retrieved from "http:en.openei.orgwindex.php?titleProperty:OpenEIUtilityRate...

  8. 30 Day Federal Register Notice Extension - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension - FINAL 30 Day Federal Register Notice Extension - FINAL PDF icon 30DAY Federal Register Notice Extension-Final.pdf More Documents & Publications 60 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Proposed

  9. 30 Day Federal Register Notice Proposed - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed - FINAL 30 Day Federal Register Notice Proposed - FINAL PDF icon 30DAY Federal Resigter Notice Proposed-Final.pdf More Documents & Publications 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Extension - FINAL 60 Day Federal Register Notice Extension

  10. 60 Day Federal Register Notice Extension - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Extension - FINAL 60 Day Federal Register Notice Extension - FINAL PDF icon 60 Day Federal Register Notice Extension-Final.pdf More Documents & Publications 30 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Proposed - FINAL

  11. 60 Day Federal Register Notice Proposed - FINAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed - FINAL 60 Day Federal Register Notice Proposed - FINAL PDF icon 60 Day Federal Register Notice Proposed-Final.pdf More Documents & Publications 30 Day Federal Register Notice Proposed - FINAL 60 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed

  12. ,"All Buildings","Nongovernment-Owned Buildings",,,,"Government-Owned Buildings"

    U.S. Energy Information Administration (EIA) Indexed Site

    3. Occupancy of Nongovernment-Owned and Government Owned Buildings, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","Nongovernment-Owned Buildings",,,,"Government-Owned Buildings" ,,"All Nongovern- ment- Owned Buildings","Owner Occupied","Nonowner Occupied","Unoccupied","All Govern-ment- Owned Buildings","Federal","State","Local" "All

  13. Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook, July 2011, Federal Energy Management Program (FEMP)

    SciTech Connect (OSTI)

    Not Available

    2011-07-01

    Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

  14. Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook, June 2010, Federal Energy Management Program (FEMP)

    SciTech Connect (OSTI)

    Not Available

    2010-06-01

    Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

  15. Federal Energy-Saving Program Keeps Federal Government on Pace to $4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Billion Investment | Department of Energy Energy-Saving Program Keeps Federal Government on Pace to $4 Billion Investment Federal Energy-Saving Program Keeps Federal Government on Pace to $4 Billion Investment December 19, 2014 - 9:45am Addthis Photovoltaic panels were installed on the Harold Washington Social Security Center in Chicago as part of an Energy Savings Performance Contract. Photovoltaic panels were installed on the Harold Washington Social Security Center in Chicago as part of

  16. Federal Technology Alert: Ground-Source Heat Pumps Applied to Federal Facilities--Second Edition

    SciTech Connect (OSTI)

    Hadley, Donald L.

    2001-03-01

    This Federal Technology Alert, which was sponsored by the U.S. Department of Energy's Office of Federal Energy Management Programs, provides the detailed information and procedures that a Federal energy manager needs to evaluate most ground-source heat pump applications. This report updates an earlier report on ground-source heat pumps that was published in September 1995. In the current report, general benefits of this technology to the Federal sector are described, as are ground-source heat pump operation, system types, design variations, energy savings, and other benefits. In addition, information on current manufacturers, technology users, and references for further reading are provided.

  17. State-federal interactions in nuclear regulation

    SciTech Connect (OSTI)

    Pasternak, A.D.; Budnitz, R.J.

    1987-12-01

    The Atomic Energy Act of 1954 established, and later Congressional amendments have confirmed, that except in areas which have been explicitly granted to the states, the federal government possesses preemptive authority to regulate radiation hazards associated with the development and use of atomic energy. Since the passage of the original Act, numerous decisions by the courts have reaffirmed the legitimacy of federal preemption, and have defined and redefined its scope. In this study, the aim is to explore the underlying issues involved in federal preemption of radiation-hazard regulation, and to recommend actions that the Department of Energy and other agencies and groups should consider undertaking in the near term to protect the preemption principle. Appropriate roles of the states are discussed, as well as recent state-level activities and their rationale, and several current arenas in which state-federal conflicts about regulation of hazards are being played out. The emphasis here is on four particular arenas that are now important arenas of conflict, but the issues discussed are far broader in scope. These four arenas are: state-level moratorium activity; emergency planning for reactors; conflicts arising from state financial regulation; and inroads in federal preemption through litigation under state law.

  18. Federal offshore statistics: leasing, exploration, production, revenue

    SciTech Connect (OSTI)

    Essertier, E.P.

    1984-09-01

    This publication is a numerical record of what has happened since Congress gave authority to the Secretary of the Interior in 1953 to lease the federal portion of the Continental Shelf for oil and gas. The publication updates and augments the first Federal Offshore Statistics, published in December 1983. It also extends a statistical series published annually from 1969 until 1981 by the US Geological Survey (USGS) under the title Outer Continental Shelf Statistics. The USGS collected royalties and supervised operation and production of minerals on the Outer Continental Shelf (OCS) until the Minerals Management Service (MMS) took over these functions in 1982. Some of the highlights are: of the 329.5 million acres offered for leasing, 37.1 million acres were actually leased; total revenues for the 1954 to 1983 period were $68,173,112,563 and for 1983 $9,161,435,540; a total of 22,095 wells were drilled in federal waters and 10,145 wells were drilled in state waters; from 1954 through 1983, federal offshore areas produced 6.4 billion barrels of oil and condensate, and 62.1 trillion cubic feet of natural gas; in 1983 alone production was 340.7 million barrels of oil and condensate, and 3.9 trillion cubic feet of gas; and for the second straight year, no oil was lost in 1983 as a result of blowouts in federal waters. 8 figures, 66 tables.

  19. Form:Federal Oil and Gas Regulation | Open Energy Information

    Open Energy Info (EERE)

    Federal Oil and Gas Regulation Jump to: navigation, search Federal Oil and Gas Regulation This is the "Federal Oil and Gas Regulation" form. To create a page with this form, enter...

  20. Form:Federal Oil and Gas Statute | Open Energy Information

    Open Energy Info (EERE)

    Federal Oil and Gas Statute Jump to: navigation, search Federal Oil and Gas Statute This is the "Federal Oil and Gas Statute" form. To create a page with this form, enter the page...

  1. Federal Utility Partnership Working Group Meeting: Washington Update

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation—given at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the Federal Buildings Personnel Training Act of 2010, Commit to Efficiency campaign, customer service, other Federal Energy Management Program (FEMP) activities, and more.

  2. Title 48 CFR 1 Federal Acquisition Regulations System | Open...

    Open Energy Info (EERE)

    8 CFR 1 Federal Acquisition Regulations System Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 48 CFR...

  3. Zarb Appointed to Lead the Federal Energy Administration | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration Zarb Appointed to Lead the Federal Energy Administration Zarb Appointed to Lead the Federal Energy Administration Washington, DC President Ford appoints Frank Zarb to be the first Administrator of the newly created Federal Energy Agency

  4. Federal Wind Energy Assistance through NREL (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2009-09-01

    NREL assists with wind resource assessment and development activities initiated by federal agencies to facilitate distributed renewable energy projects at federal agency sites. This brief outlines the process for requesting NREL assistance with federal wind energy projects.

  5. Fact #682: July 4, 2011 Federal Alternative Fuel Use | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: July 4, 2011 Federal Alternative Fuel Use Fact 682: July 4, 2011 Federal Alternative Fuel Use The Federal Government used nearly 9 million gasoline-gallon equivalents of ...

  6. Enforcement Letter, Fluor Federal Services - April 16, 2002 ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Services - April 16, 2002 Enforcement Letter, Fluor Federal Services - April 16, 2002 April 16, 2002 Issued to Fluor Federal Services related to 10 CFR 820.11 at the...

  7. Federal Fleet Files: Vol. 1, No. 2 - June 2009

    SciTech Connect (OSTI)

    2009-06-12

    June 2009 issue of the FEMP Federal Fleet Files monthly newsletter for the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.

  8. Executive Order 12969-Federal Acquisition and Community RightTo...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2969-Federal Acquisition and Community RightTo-Know Executive Order 12969-Federal Acquisition and Community RightTo-Know The efficiency of the Federal Government is served when it ...

  9. W4, Federal Withholding Tax Form | Department of Energy

    Energy Savers [EERE]

    W4, Federal Withholding Tax Form W4, Federal Withholding Tax Form PDF icon W4, Federal Withholding Tax Form More Documents & Publications Employee In-Processing Forms DOE F 1500.7...

  10. Federal Power Act section 202(c) - Hurricane Ike, September 2008...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Power Act section 202(c) - Hurricane Rita, September 2005 Federal Power Act section 202(c) - Cross-Sound Cable Company, August 2003 Federal Power Act section 202(c) - ...

  11. Alternative Fuels Data Center: Ten Ways You Can Start to Cut Petroleum Use

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Right Now Ten Ways You Can Start to Cut Petroleum Use Right Now to someone by E-mail Share Alternative Fuels Data Center: Ten Ways You Can Start to Cut Petroleum Use Right Now on Facebook Tweet about Alternative Fuels Data Center: Ten Ways You Can Start to Cut Petroleum Use Right Now on Twitter Bookmark Alternative Fuels Data Center: Ten Ways You Can Start to Cut Petroleum Use Right Now on Google Bookmark Alternative Fuels Data Center: Ten Ways You Can Start to Cut Petroleum Use Right Now on

  12. FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) Form provides information on the federal assistance budget for construction projects, including calculation of the federal award needed to meet requirements, exclusions, and the proposed method for calculating the non-federal share. PDF icon FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) More Documents & Publications DOE F 4600.4 DOE F 4600.5 DOE F 4600.3

  13. Memorandum of Understanding Regarding Coordination in Federal Agency Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Electric Transmission Facilities on Federal Land, October 23, 2009 | Department of Energy Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve

  14. Federal Renewable Energy Project Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance Federal Renewable Energy Project Assistance Federal agencies can get renewable energy project assistance from the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP), DOE national laboratories, and other federal agencies. FEMP also offers training to help agencies understand federal renewable energy requirements and goals, and provides renewable energy maps, tools, and a list of federal renewable energy projects. Assistance from FEMP FEMP offers renewable energy

  15. Resources for Sustainable Federal Buildings and Campuses | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Facilities » Sustainable Buildings & Campuses » Resources for Sustainable Federal Buildings and Campuses Resources for Sustainable Federal Buildings and Campuses Many helpful resources about sustainable federal buildings and campuses are available. Federal Programs Building Energy Codes Program: Website provides information about the 2015 International Energy Conservation Code and ANSI/ASHRAE/IES Standard 90.1-2013 for non-federal buildings. The Federal Energy Management Program

  16. Alternative Fuels Data Center: Federal Laws and Incentives

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Center: Federal Laws and Incentives to someone by E-mail Share Alternative Fuels Data Center: Federal Laws and Incentives on Facebook Tweet about Alternative Fuels Data Center: Federal Laws and Incentives on Twitter Bookmark Alternative Fuels Data Center: Federal Laws and Incentives on Google Bookmark Alternative Fuels Data Center: Federal Laws and Incentives on Delicious Rank Alternative Fuels Data Center: Federal Laws and Incentives on Digg Find More places to share Alternative Fuels Data

  17. Requirements for Renewable Energy on Federal Sites | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Requirements for Renewable Energy on Federal Sites Requirements for Renewable Energy on Federal Sites There are four federal guidelines for renewable energy projects. The Energy Policy Act of 2005 (EPAct 2005) sets the primary renewable energy requirements for federal agencies, and the other three guidelines build on EPAct 2005. For additional details on each the following federal mandates, visit the Federal Energy Management Program website. Energy Policy Act of 2005 The Energy Policy Act of

  18. Effects of Climate Change on Federal Hydropower (Report to Congress) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Effects of Climate Change on Federal Hydropower (Report to Congress) Effects of Climate Change on Federal Hydropower (Report to Congress) The U.S. Department of Energy (DOE), in consultation with the federal Power Marketing Administrations (PMAs) and other federal agencies, including federal dam owners, has prepared a comprehensive assessment examining the effects of climate change on water available for hydropower at federal facilities and on the marketing of power from

  19. 1998 federal technical standards workshop: Proceedings

    SciTech Connect (OSTI)

    1998-10-01

    The theme for the 1998 workshop was Standards Management -- A World of Change and Opportunities. The workshop`s goal was to further the implementation of the National Technology Transfer and Advancement Act of 1995 (Public Law 104-113) through the sharing of standards management success stories, lessons learned, and emerging initiatives within the Executive Branch of the Federal Government. The target audience for this workshop included agency/department and contractor personnel and representatives of standards developing organizations that either used technical standards in their work for the Federal Government of participated in standards writing/management activities in support of the missions and programs of Federal agencies/departments. As with previous standards workshops sponsored by the DOE, views on the technical subject areas under the workshop theme were solicited from and provided by agency Standards Executives and standards program managers, voluntary standards organizations, and the private sector. This report includes vugraphs of the presentations.

  20. Federal Fleet Files, FEMP, Vol. 1, No. 3 - July 2009

    SciTech Connect (OSTI)

    2009-07-24

    July 2009 issue of the monthly newsletter for the FEMP Federal Fleet Program that outlines vehicle, alternative fuel, infrastructure, and management strategy updates to Federal agencies.