National Library of Energy BETA

Sample records for federal facility agreement

  1. Idaho National Engineering Laboratory Federal Facility Agreement...

    Office of Environmental Management (EM)

    Federal Facility Agreement and Consent Order State Idaho Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Ensure that the environmental impacts...

  2. Lawrence Livermore National Laboratory Federal Facility Agreement...

    Office of Environmental Management (EM)

    Site 300) Agreement Name Lawrence Livermore National Laboratory Federal Facility Agreement Under CERCLA Section 120, June 29, 1992 State California Agreement Type Federal Facility ...

  3. MONTICELLO PROJECTS FEDERAL FACILITIES AGREEMENT REPORT Report...

    Office of Legacy Management (LM)

    PROJECTS FEDERAL FACILITIES AGREEMENT REPORT Report Period: January 1- March 31, 2006 DOE Project Coordinator: Ray Plieness HIGHLIGHTS The Federal Facilities Agreement meeting was ...

  4. Federal Facility Agreement progress report

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The (SRS) Federal Facility Agreement (FFA) was made effective by the US. Environmental Protection Agency Region IV (EPA) on August 16, 1993. To meet the reporting requirements in Section XXV of the Agreement, the FFA Progress Report was developed. The FFA Progress Report is the first of a series of quarterly progress reports to be prepared by the SRS. As such this report describes the information and action taken to September 30, 1993 on the SRS units identified for investigation and remediation in the Agreement. This includes; rubble pits, runoff basins, retention basin, seepage basin, burning pits, H-Area Tank 16, and spill areas.

  5. Brookhaven National Laboratory Federal Facility Agreement, February...

    Office of Environmental Management (EM)

    Brookhaven National Laboratory Agreement Name Brookhaven National Laboratory Federal Facility Agreement Under CERCLA Section 120, February 28, 1992 State New York Agreement Type ...

  6. MRAP MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    MRAP MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT MayJune 2005 Report Period: May 1 -June 30, 2005 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS DOE constmction, as ...

  7. Federal Facility Compliance Agreement on Storage of Polychlorinated...

    Office of Environmental Management (EM)

    on Storage of Polychlorinated Biphenyls, August 8, 1996 State Washington Agreement Type Federal Facility Compliance Agreement Legal Driver(s) TSCA Scope Summary Address DOE and the ...

  8. Savannah River Site Federal Facility Agreement, January 15, 1993...

    Office of Environmental Management (EM)

    Site Agreement Name Savannah River Site Federal Facility Agreement Under Section 120 of ... with past and present activities at the Savannah River Site are thoroughly investigated ...

  9. Paducah Site Federal Facility Agreement | Department of Energy

    Energy Savers [EERE]

    Federal Facility Agreement Paducah Site Federal Facility Agreement The Federal Facility Agreement (FFA) governs the corrective action/response action process from site investigation through site remediation as agreed to by DOE, the U.S. Environmental Protection Agency, and Kentucky under the Comprehensive Environmental Response, Compensation, and Liability Act; the Resource Conservation and Recovery Act; Kentucky Revised Statute 224; and other laws and regulations identified in the FFA. Paducah

  10. Federal Facility Agreement for the Paducah Gaseous Diffusion Plant Summary

    Office of Environmental Management (EM)

    Federal Facility Agreement for the Paducah Gaseous Diffusion Plant State Kentucky Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Ensure that the environmental impacts of activities at the Site are investigated and appropriate response actions are taken. Parties U.S. DOE; Kentucky Natural Resources and Environmental Protection Cabinet; U.S. EPA Date 2/01/1998 SCOPE * Ensure all releases of hazardous substances, pollutants, or contaminants are addressed to

  11. Idaho National Engineering Laboratory Federal Facility Agreement...

    Office of Environmental Management (EM)

    ... that she or he is fully authorized to enter into the terms and conditions of this Agreement. 3.2 ... December 9, 1991 EM HOME | DOE HOME | SEARCH | WEBSITE OUTLINE FEEDBACK | ...

  12. Mr. Todd Mullins Federal Facility Agreement Manager Kentucky Department for Environmental Protection

    Office of Environmental Management (EM)

    JUN 1 1 2013 Mr. Todd Mullins Federal Facility Agreement Manager Kentucky Department for Environmental Protection Division of Waste Management 200 Fair Oaks Lane, 2 nd Floor Frankfort, Kentucky 40601 Ms. Jennifer Tufts Federal Facility Agreement Manager U.S. Environmental Protection Agency, Region 4 61 Forsyth Street Atlanta, Georgia 30303 Dear Mr. Mullins and Ms. Tufts: PPPO-02-1813000-13B TRANSMITTAL OF THE COMMUNITY RELATIONS PLAN UNDER THE FEDERAL FACILITY AGREEMENT AT THE U.S. DEPARTMENT OF

  13. Federal Facility Agreement for the Laboratory for Energy-Related Health Research Summary

    Office of Environmental Management (EM)

    Energy Related Health Research Agreement Name Federal Facility Agreement for the Laboratory for Energy- Related Health Research State California Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Establish a procedural framework and schedule for developing, implementing and monitoring appropriate response actions at LEHR Parties DOE; USEPA; California Department of Toxic Substances Control; Central Valley Regional Water Quality Control Board; California

  14. Monticello Mill site Federal Facility Agreement, December 22...

    Office of Environmental Management (EM)

    ... that he or she is fully authorized to enter into terms and conditions of this Agreement and to ... Go to Selected EM Cleanup and Compliance Agreements EM HOME | DOE HOME | SEARCH | ...

  15. Federal Facility Compliance Agreement on Storage of Polychlorinated...

    Office of Environmental Management (EM)

    ... EPA will be permitted to enter all areas of DOE and NNPP ... NNPP established by the terms of this Agreement shall be ... EM HOME | DOE HOME | SEARCH | WEBSITE OUTLINE FEEDBACK ...

  16. Federal Facility Agreement and Consent Order Regulatory Strategy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy for Projects Federal Assistance Reporting Checklist and Instructions for Projects DOE F 4600.2 FA RepReqChklst FINAL 10-2014.docx (88.14 KB) More Documents & Publications POLICY FLASH 2015-01 1 1 Department of Energy

    for RD&D Projects Federal Assistance Reporting Checklist and Instructions for RD&D Projects DOE F 4600.2, Financial Assistance Reporting Checklist for RD and D (154.3 KB) Attachment 1, Research Performance Progress Report (183.52 KB) More

  17. Federal Facility Agreement (FFA) Signed at Oak Ridge

    Broader source: Energy.gov [DOE]

    The Oak Ridge Reservation FFA was implemented on January 1, 1992. It is a CERCLA-required agreement among DOE, the United States Environmental Protection Agency, and the Tennessee Department of Environment and Conservation to promote cooperation and participation to clean and remediate the Oak Ridge Reservation.

  18. Hanford Federal Facility Agreement and Consent Order quarterly progress report for the period ending June 30, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    This is the ninth quarterly report as required by the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1990), also known as the Tri-Party Agreement, established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology). The Tri-Party Agreement sets the plan and schedule for achieving regulatory compliance and cleanup of waste sites at the Hanford Site. This report covers progress for the quarter that ended June 30, 1991. A total of 87 milestones have been completed to date. 39 refs., 1 fig.

  19. Program management assessment of Federal Facility Compliance Agreement regarding CAA-40 C.F.R. Part 61, Subpart H at the Los Alamos National Laboratory

    SciTech Connect (OSTI)

    1997-01-01

    An assessment of Los Alamos National Laboratory`s management system related to facility compliance with an element of the Clean Air Act was performed under contract by a team from Northern Arizona University. More specifically, a Federal Facilities Compliance Agreement (FFCA) was established in 1996 to bring the Laboratory into compliance with emissions standards of radionuclides, commonly referred to as Rad/NESHAP. In the fall of 1996, the four-person team of experienced environmental managers evaluated the adequacy of relevant management systems to implement the FFCA provisions. The assessment process utilized multiple procedures including document review, personnel interviews and re-interviews, and facility observations. The management system assessment was completed with a meeting among team members, Laboratory officials and others on November 1, 1996 and preparation of an assessment report.

  20. Uranium Processing Facility Team Signs Partnering Agreement ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Processing Facility ... Uranium Processing Facility Team Signs Partnering Agreement ... Nuclear Security, LLC; John Eschenberg, Uranium Processing Facility Project Office; Brian ...

  1. SANDIA NATIONAL LABORATORIES NFE AGREEMENTS NON-FEDERAL ENTITY AGREEMENTS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NATIONAL LABORATORIES NFE AGREEMENTS NON-FEDERAL ENTITY AGREEMENTS PURPOSE OF NFE AGREEMENTS To support its missions, Sandia National Laboratories' (SNL) engineers and scientists conduct research in many areas. Many of the technologies, processes, and special technical expertise they have developed have been applied to solving problems in the private sector through mutually beneficial, technology partnerships. A company working with SNL on such an endeavor is known as a non-Federal entity (NFE).

  2. Toxic Substances Control Act Uranium Enrichment Federal Facility...

    Office of Environmental Management (EM)

    Toxic Substances Control Act (TSCA) Uranium Enrichment Federal Facility Compliance Agreement establishes a plan to bring DOE's Uranium Enrichment Plants (and support facilities) ...

  3. Uranium Processing Facility team signs partnering agreement ...

    National Nuclear Security Administration (NNSA)

    Uranium Processing Facility team signs partnering agreement Thursday, July 24, 2014 - 9:40am Officials from NNSA's Uranium Processing Facility Project Office and Consolidated ...

  4. Toxic Substances Control Act Uranium Enrichment Federal Facilities...

    Office of Environmental Management (EM)

    Toxic Substance Control Act Uranium Enrichment Federal Facilities Compliance Agreement ... for bringing DOE's former and active Uranium Enrichment Plants in Paducah, Portsmouth, ...

  5. Purchasing Renewable Power for Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchasing Renewable Power for Federal Facilities Purchasing Renewable Power for Federal Facilities Federal agencies can purchase renewable power or renewable energy certificates ...

  6. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water ...

  7. Operations and Maintenance in Federal Facilities | Department...

    Office of Environmental Management (EM)

    Operations and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as ...

  8. Federal-facilities Hazardous-Waste Compliance Manual. Final report

    SciTech Connect (OSTI)

    Not Available

    1990-01-09

    In the continuing effort to achieve a higher level of compliance with the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) at Federal facilities, the Federal Facilities Hazardous Waste Compliance Office (FFHWCO) has developed the Federal Facilities Hazardous Waste Compliance Manual. The manual includes an overview of the Federal-facilities hazardous-waste compliance program, relevant statutory authorities, model provisions for Federal facility agreements, enforcement and other applicable guidance, Federal facilities docket and NPL listings, data-management information, selected DOD and DOE program guidance, and organization charts and contacts. This compendium is intended to be used as a reference by Regional RCRA and CERCLA enforcement personnel and Regional Counsels, particularly as an orientation guide for new Federal facilities staff.

  9. NEGOTIATED AGREEMENT BETWEEN National Energy American Federation...

    Energy Savers [EERE]

    ... This Agreement excludes all supervisors, management officials, confidential employees, and ... grievance, or other confidential Union business relating to representational activities. ...

  10. Federal On-Site Renewable Power Purchase Agreements | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Federal On-Site Renewable Power Purchase Agreements On-site renewable power ... to fund renewable energy projects with minimal ... Distributed Generation Projects: Webinar ...

  11. Commissioning for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Federal Facilities Commissioning for Federal Facilities Guide describes building commissioning, recommissioning, retrocommissioning, and continuous commissioning for federal facilities. Download the Commissioning for Federal Facilities guide. (2.77 MB) More Documents & Publications Chapter 9: Commissioning the Building Guide to Operating and Maintaining EnergySmart Schools Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit

  12. Hanford Federal Facility Agreement & Consent Order

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PCB Transformer disposal. The nineteen Polychlorinated Biphenyl (PCB) electrical transformers at the FFTF will be disposed of after the transformers are removed from service....

  13. MSG MONTICELLO PROJECTS FEDERAL FACILITIES AGREEMENT REPORT

    Office of Legacy Management (LM)

    ... Total G:tllons Pumped from LCRI as Measured by Flowmeter Momhly Basis Pond4 LOS Pond 4 Evapomtion Pond Eleva: '" MoMh Total for A"'"'8o Gallons Per DA WeeklvBasis WeeklyBISis ...

  14. MSGOUID MONTICELLO PROJECTS *FEDERAL FACILITIES AGREEMENT REPORT

    Office of Legacy Management (LM)

    ... 0 Pump hllll failed w q:np LDS 1 2Z2 31.7 13S Plmq:l hu fail

  15. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    ... the Utah Department of Environmental Quality, and the Environmental Protection Agency. ... 0 1312005 0 0 l102005 0 0 11712005 43 Power bump activated pump 0 0.0 0.0 1242005 0 ...

  16. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    millsite during the week of July 25. The subcontractor returned in September 27 and sprayed again, focusing on undesirable plants that may adversely affect the wetland areas. ...

  17. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    on this document (September 29, 2004), the MMTS was designated as "construction complete." ... thereby providing a designation of "construction complete" for the MMTS. The annual ...

  18. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    of Transportation regulations training for the transportation of radioactive materials. ... Benny Musselman) successfully completed the training course. A "redlined" copy of Chapter ...

  19. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    In accordance with the Long-Term Surveillance and Maintenance Operating Procedures, DOE provided Hazardous Materials Driver Training and Radiological Worker II training to City of ...

  20. Weldon Spring Site Federal Facility Agreement

    Office of Legacy Management (LM)

    ... Subsection 122. "DOE and U.S. EPA agree that any requirement for the payment or obligation ... appropriate adjustments to the dates that require the payment or obligation of such funds. ...

  1. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    ... ViBiblt Piping Visible Liner Lifo S*vor Station Bvidoli.C<) of erosion of: Top ofl'ond 4 ... FRX:4355872780 1.gs l'"' ND* IJO . : ,. . ** JO f)D" ND ID: SM STOLLER PRGE:003 R95%

  2. FEMP Offers Training on Federal On-Site Renewable Power Purchase Agreements

    Broader source: Energy.gov [DOE]

    This refreshed eTraining core course provides federal energy and facility managers and contracting officers with up-to-date knowledge and best practices for developing an on-site renewable power purchase agreement (PPA) on a federal site and includes current definitions, references, and guidance to help launch or accelerate a PPA project.

  3. FERC Order No. 2003 Appendix 4 - Facilities Study Agreement ...

    Open Energy Info (EERE)

    4 - Facilities Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 4 - Facilities Study Agreement Abstract FERC...

  4. Potential Hydroelectric Development at Existing Federal Facilities...

    Open Energy Info (EERE)

    Potential Hydroelectric Development at Existing Federal Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Potential Hydroelectric Development at...

  5. Lawrence Livermore National Laboratory Federal Facility Compliance...

    Office of Environmental Management (EM)

    Federal Facility Compliance Act Order for Lawrence Livermore National Laboratory ... treatment of mixed waste at Lawrence Livermore National Laboratory Parties DOE; State ...

  6. Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order with ROTC 1, Revision No. 0

    SciTech Connect (OSTI)

    Lynn Kidman

    2008-02-01

    Many Federal Facility Agreement and Consent Order (FFACO) Use Restrictions (URs) have been established at various corrective action sites (CASs) as part of FFACO corrective actions (FFACO, 1996; as amended January 2007). Since the signing of the FFACO in 1996, practices and procedures relating to the implementation of risk-based corrective action (RBCA) have evolved. This document is part of an effort to re-evaluate all FFACO URs against the current RBCA criteria (referred to in this document as the Industrial Sites [IS] RBCA process) as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). Based on this evaluation, the URs were sorted into the following categories: 1. Where sufficient information exists to determine that the current UR is consistent with the RCBA criteria 2. Where sufficient information exists to determine that the current UR may be removed or downgraded based on RCBA criteria. 3. Where sufficient information does not exist to evaluate the current UR against the RCBA criteria. After reviewing all the existing FFACO URs, the 49 URs addressed in this document have sufficient information to determine that these current URs may be removed or downgraded based on RCBA criteria. This document presents recommendations on modifications to existing URs that will be consistent with the RCBA criteria.

  7. Project Labor Agreements- Federal Acquisition Circular 2005-41

    Broader source: Energy.gov [DOE]

    A final rule was published in the Federal Register at 75 Fed. Reg. 19168 on April 13,201 0 implementing Executive Order 13502, which encourages agencies to consider using Project Labor Agreements on Federal construction projects at least $25,000,000 in total cost. A summary is attached for your information.

  8. Procuring Solar for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Solar for Federal Facilities Procuring Solar for Federal Facilities Pre-screening and Planning - understand federal requirements and conducting a site pre-screening ...

  9. National Environmental Justice Advisory Council Federal Facilities Working

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Group Report | Department of Energy National Environmental Justice Advisory Council Federal Facilities Working Group Report National Environmental Justice Advisory Council Federal Facilities Working Group Report Environmental Justice and Federal Facilities: recommendations for improving stakeholder relations between federal facilities and environmental justice communities, October 2004 National Environmental Justice Advisory Council Federal Facilities Working Group Report (1.37 MB) More

  10. Argonne User Facility Agreements | Advanced Photon Source

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Materials (CNM), The Argonne Leadership Computing Facility (ALCF), The Argonne Tandem Linac Accelerator System (ATLAS), and The Intermediate Voltage Electron Microscopy...

  11. Uranium Processing Facility team signs partnering agreement ...

    National Nuclear Security Administration (NNSA)

    This Site Budget IG Web Policy Privacy No Fear Act Accessibility FOIA Sitemap Federal Government The White House DOE.gov USA.gov Jobs Apply for Our Jobs Our Jobs Working at NNSA...

  12. California Federal Facilities: Rate-Responsive Buidling Operating...

    Office of Environmental Management (EM)

    California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and ... for cost and energy savings in California federal facilities. ...

  13. Greening Federal Facilities: An Energy, Environmental, and Economic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Economic Resource Guide for Federal Facility managers and Designers; Second Edition Greening Federal Facilities: An Energy, Environmental, and Economic Resource ...

  14. Federal Facilities Maintenance, Repair Report Calls for Action

    SciTech Connect (OSTI)

    Bartlett, Rosemarie

    2012-10-01

    This article is an overview of a recent report by the Federal Facilities Council on "Predicting Outcomes from Investments in Maintenance and Repair of Federal Facilities."

  15. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010 Procuring Solar Energy: A Guide for Federal Facility ...

  16. LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP EXECUTION...

    Office of Environmental Management (EM)

    LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP EXECUTION PLAN Los Alamos National ... Safety and Security LFRG Low-Level Waste Disposal Facility Federal Review Group LLW ...

  17. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy ...

  18. Credibility and trust in federal facility cleanups

    SciTech Connect (OSTI)

    Raynes, D.B.

    1995-12-01

    The most important indicator of a well-managed site cleanup effort may no longer be funding or scientific expertise. While support for federal facility cleanup has included appropriations of more than $10 billion annually, these expenditures alone are unlikely to assure progress toward environmental remediation. {open_quotes}Trust{close_quotes} is now overwhelmingly mentioned as a prerequisite for progress with site cleanup in DOE`s weapons complex. In part, federal budget deficits are forcing participants to focus on factors that build consensus and lead to cost-effective cleanup actions. In some cases, the stakeholders at cleanup sites are making efforts to work cooperatively with federal agencies. A report by 40 representatives of federal agencies, tribal and state governments, associations, and others developed recommendations to create a {open_quotes}new era of trust and consensus-building that allows all parties to get on with the job of cleaning up federal facilities in a manner that reflects the priorities and concerns of all stakeholders.{close_quotes} Changes are underway affecting how federal agencies work with federal and state regulators reflecting this concept of shared responsibility for conducting cleanup. This paper addresses these changes and provides examples of the successes and failures underway.

  19. Low-Level Waste Disposal Facility Federal Review Group Manual...

    Office of Environmental Management (EM)

    Low-Level Waste Disposal Facility Federal Review Group Manual Low-Level Waste Disposal Facility Federal Review Group Manual This Revision 3 of the Low-Level Waste Disposal Facility ...

  20. Greening Federal Facilities: An Energy, Environmental, and Economic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Resource Guide for Federal Facility managers and Designers; Second Edition | Department of Energy Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition A nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the

  1. Federal On-Site Renewable Power Purchase Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements The Federal Energy Management Program (FEMP) provides project assistance to federal agencies interested in power purchase agreements (PPAs) for on-site renewable energy projects. A PPA is a financing option under FEMP's Renewable Energy Procurement (REP) Program. FEMP assists agencies through the PPA evaluation and implementation process.

  2. Federal On-Site Renewable Power Purchase Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Financing » Renewable Energy Procurement » Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements The Federal Energy Management Program (FEMP) provides project assistance to federal agencies interested in power purchase agreements (PPAs) for on-site renewable energy projects. A PPA is a financing option under FEMP's Renewable Energy Procurement (REP) Program. FEMP assists agencies

  3. AFFECT 2016: Assisting Federal Facilities with Energy Conservation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technologies Webinar | Department of Energy AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar Webinar describes the 2016 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) funding opportunity offered by the Federal Energy Management Program. View the webinar slides.

  4. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment This webinar, held on Sept. 24, 2013, provides information on federal finance ...

  5. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Appendix B, September 2010 Procuring Solar Energy: A Guide for Federal Facility Decision ... process for successfully planning for and installing solar technology on a federal site. ...

  6. Procuring Solar for Federal Facilities | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Procuring Solar Energy: A Guide for Federal Facility Decision Makers is a Web guide for federal site managers, site contractors, and procurement specialists to help them navigate ...

  7. Sample Documents for Federal On-Site Renewable Power Purchase Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Sample Documents for Federal On-Site Renewable Power Purchase Agreements Sample Documents for Federal On-Site Renewable Power Purchase Agreements To help streamline the federal on-site renewable power purchase agreement (PPA) process, the Federal Energy Management Program works with agencies and partners to assemble sample documents from completed PPA projects. See these sample documents for examples of requests for proposals (RFPs), land use agreements, and more.

  8. Low-Level Waste Disposal Facility Federal Review Group Manual

    Office of Environmental Management (EM)

    LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP MANUAL REVISION 3 JUNE 2008 (This page ... 3, June 200S Concurrence The Low-Level Waste Disposal Facility Federal Review Group ...

  9. Federal Finance Facilities Available for Energy Efficiency Upgrades

    Energy Savers [EERE]

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities

  10. EISA Federal Facility Management and Benchmarking Reporting Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy EISA Federal Facility Management and Benchmarking Reporting Requirements EISA Federal Facility Management and Benchmarking Reporting Requirements Section 432 of the Energy Independence and Security Act of 2007 (EISA 432) requires federal agencies to identify "covered facilities" that constitute at least 75% of their total facility energy use as subject to the requirements of the statute. Each federal agency must designate an energy manager to be responsible for

  11. Renewable Energy Projects at Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects at Federal Facilities Renewable Energy Projects at Federal Facilities The Federal Energy Management Program (FEMP) tracks the following examples of renewable energy projects at federal facilities. To find a federal renewable energy project, browse the table by agency, technology, or project financials, or search by keyword. Click a column heading to sort the table. Case studies are also available. Contact FEMP to add your renewable energy project to the table below. Agency,

  12. Sample Documents for Federal On-Site Renewable Power Purchase Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Renewable Energy Procurement » Sample Documents for Federal On-Site Renewable Power Purchase Agreements Sample Documents for Federal On-Site Renewable Power Purchase Agreements To help streamline the federal on-site renewable power purchase agreement (PPA) process, the Federal Energy Management Program works with agencies and partners to assemble sample documents from completed PPA projects. See these sample documents for examples of requests for proposals (RFPs), land

  13. Federal Finance Facilities Available for Energy Efficiency Upgrades and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Clean Energy Deployment | Department of Energy Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment The Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment resource guide lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local

  14. California Federal Facilities: Rate-Responsive Building Operating for

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Deeper Cost and Energy Savings | Department of Energy Federal Facilities: Rate-Responsive Building Operating for Deeper Cost and Energy Savings California Federal Facilities: Rate-Responsive Building Operating for Deeper Cost and Energy Savings Fact sheet from the Federal Energy Management Program (FEMP) describes rate-responsive building operations for cost and energy savings in California federal facilities. Download the Rate-Responsive Building Operating for Deeper Cost and Energy Savings

  15. Energy Management in Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Management in Federal Facilities Energy Management in Federal Facilities Data Centers Data Centers Federal data centers used nearly 10% of federal electricity use in 2013. Find out how to make data centers more energy efficient. Read more Laboratories Laboratories Laboratory activities and ventilation requirements can be energy intensive. Find out how to make laboratories more efficient. Read more Operations and Maintenance Operations and Maintenance Facilities rely on pumps, motors, and

  16. Federal Agency Facility Reporting Requirements and Performance Data |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Reporting & Data » Federal Agency Facility Reporting Requirements and Performance Data Federal Agency Facility Reporting Requirements and Performance Data The Federal Energy Management Program (FEMP) provides information and tools to help agencies report annual energy and water consumption and resource management efforts for federal facilities. FEMP also collects and publishes agency performance data. Reporting Requirements Agencies are required to report progress

  17. Assisting Federal Facilities with Energy Conservation Technologies (AFFECT)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Funding Opportunity | Department of Energy Project Financing » Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Opportunity Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Opportunity The Federal Energy Management Program (FEMP) provides project assistance through the AFFECT funding opportunity. AFFECT provides grants for the development of capital projects to increase the energy efficiency and renewable energy

  18. Nevada Agreement for Delegation of Federal PSD Program | Open...

    Open Energy Info (EERE)

    of the Federal Prevention of Significant Deterioration Program. Author United States Environmental Protection Agency Recipient State of Nevada Division of Environmental...

  19. NEGOTIATED AGREEMENT BETWEEN National Energy American Federation of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    95 March 25, 2013 Signatures This document is approved as the binding agreement between the parties and is approved on this 25th day of March 2013: Table of Contents PREAMBLE ................................................................................................................................. 3 ARTICLE 1: EXCLUSIVE RECOGNITION ........................................................................... 4 ARTICLE 2: EFFECTIVE DATE AND AGREEMENT DURATION

  20. About Federal On-Site Renewable Power Purchase Agreements | Department...

    Broader source: Energy.gov (indexed) [DOE]

    the National Renewable Energy Laboratory in Golden, Colorado. A PPA funded the photovoltaic system installed on the Research Support Facility at the National Renewable Energy ...

  1. Idaho Site Launches Startup of Waste Treatment Facility Following Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inspection, DOE Milestone | Department of Energy Launches Startup of Waste Treatment Facility Following Federal Inspection, DOE Milestone Idaho Site Launches Startup of Waste Treatment Facility Following Federal Inspection, DOE Milestone April 23, 2012 - 12:00pm Addthis A controlled, phased startup of the Integrated Waste Treatment Unit began today after the facility passed a federal inspection. A controlled, phased startup of the Integrated Waste Treatment Unit began today after the

  2. Commissioning Process for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Process for Federal Facilities Commissioning Process for Federal Facilities The commissioning process for federal facilities (including new construction and existing buildings) can be completed in four steps. Step 1: Plan The planning step includes developing and agreeing upon the overall commissioning objectives and strategies, assembling the project team, and compiling and perusing building and equipment documentation. Objectives for this step are to: Optimize building operations to reduce

  3. California Federal Facilities: Rate-Responsive Building Operating...

    Broader source: Energy.gov (indexed) [DOE]

    California federal facilities. Download the Rate-Responsive Building Operating for Deeper Cost and Energy Savings fact sheet. (614.65 KB) More Documents & Publications California ...

  4. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Screening Evaluation Checklist, September 2010 Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010 This ...

  5. Adopting LED Technology: What Federal Facility Managers Need to Know

    Broader source: Energy.gov [DOE]

    This document describes the presentation slides for the "Adopting LED Technology: What Federal Facility Managers Need to Know" webinar that took place on September 11, 2014.

  6. EISA Federal Covered Facility Management and Benchmarking Data...

    Broader source: Energy.gov (indexed) [DOE]

    Federal Government Compliance Overview FEMP offers covered facility management and ... Annual Energy Reporting Requirements FEMP Contacts Chris Tremper U.S. Department of ...

  7. SANDIA NATIONAL LABORATORIES NFE AGREEMENTS NON-FEDERAL ENTITY...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    private sector through mutually beneficial, technology partnerships. A company working with SNL on such an endeavor is known as a non-Federal entity (NFE). An NFE can be private ...

  8. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEDERAL FACILITIES An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers SECOND EDITION DOE/GO-102001-1165 Section DOE/GO-102001-1165 NREL/BK-710-29267 May 2001 i Greening Federal Facilities An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers SECOND EDITION "Then I say the earth belongs to each ... generation during its course, fully and in its own right, no generation can contract debts greater than

  9. Waste Treatment Facility Passes Federal Inspection, Completes Final

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Milestone, Begins Startup | Department of Energy Waste Treatment Facility Passes Federal Inspection, Completes Final Milestone, Begins Startup Waste Treatment Facility Passes Federal Inspection, Completes Final Milestone, Begins Startup April 23, 2012 - 12:00pm Addthis Media Contact Erik Simpson, 208-390-9464 Danielle Miller, 208-526-5709 The Idaho site today initiated the controlled, phased startup of a new waste treatment facility scheduled to begin treating 900,000 gallons of radioactive

  10. Assisting Federal Facilities with Energy Conservation Technologies...

    Broader source: Energy.gov (indexed) [DOE]

    The Federal Energy Management Program (FEMP) provides project assistance through the ... AFFECT 2016 Funding Opportunity On May 26, 2016, FEMP issued a Funding Opportunity ...

  11. Mr. Todd Mullins Federal Facility Agreement Manager Kentucky...

    Broader source: Energy.gov (indexed) [DOE]

    ... (EPA), and the Kentucky Energy and Environment Cabinet ... about the environmental program so they can provide input ... Stakeholders are individuals, groups, communities, and other ...

  12. Title Federal Facility Agreement and Consent Order Author

    National Nuclear Security Administration (NNSA)

    ... and the Department of Energy for the Storage of Low-Level Land Disposal Restricted ... shall be provided split or duplicate 44 samples of all samples collected by DOE andor ...

  13. Weldon Spring Federal Facility Agreement, January 28, 1992 Summary

    Office of Environmental Management (EM)

    US EPA; US DOE Date 12892 SCOPE * Investigate the environmental impacts of past and present activities at the Site on the public health, welfare and the environment. * Establish...

  14. FEDERAL FACILITY COMPLIANCE AGREEMENT (FFCA) STACK ISOLATION PROJECT FUNCTIONS & REQUIREMENTS

    SciTech Connect (OSTI)

    TRANBARGER, R.K.

    2003-12-16

    This document delineates the functions and requirements for the FFCA Stack Isolation Project for the 244-A, 244-BX, 244-5, and 244-TX DCRTs. The isolation of each ventilation system and stack includes the electrical, instrumentation, and mechanical isolation of the ventilation system and the installation of primary and annulus breather filters to provide passive ventilation to meet the FFCA requirements.

  15. Brookhaven National Laboratory Federal Facility Agreement, February 28, 1992

    Office of Environmental Management (EM)

  16. Lawrence Livermore National Laboratory Federal Facility Agreement, June 29, 1992

    Office of Environmental Management (EM)

  17. Mound Plant Federal Facility Agreement, July 15, 1993

    Office of Environmental Management (EM)

  18. Monticello NPL Sites Federal Facilities Agreement Meeting Minutes...

    Office of Legacy Management (LM)

    year by September 30 to project the enforceable milestones and non-enforceable target dates for site activities anticipated over a 3-year rolling schedule (cunent fiscal year+ 2). ...

  19. Weldon Spring Federal Facility Agreement, January 28, 1992

    Office of Environmental Management (EM)

  20. Federal Facility Agreement for the Oak Ridge Reservation, January...

    Office of Environmental Management (EM)

    a basis for a determination that the DOE has completed the Remedial InvestigationFeasibility Study(s), remedial design(s), and remedial action(s) at the Site pursuant to CERCLA...

  1. Monticello Mill site Federal Facility Agreement, December 22...

    Office of Environmental Management (EM)

    of Environmental Health Date 12221988 SCOPE * Identify Interim Remedial Action (IRA) alternatives, if any, which are appropriate at the Site prior to the implementation of ...

  2. Title Federal Facility Agreement and Consent Order Author

    National Nuclear Security Administration (NNSA)

    ... IV.32.< "Nellis Air.Force Range" shall mean the property so described in Appendix I, ... "person" contained in the Nevada Water Pollution Control Law, NRS 445A.300vet seg.. and ...

  3. EXECUTIVE SUMMARY FOR HANFORD FEDERAL FACILITY AGREEMENT AND...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... the Washington Hazardous Waste Management Act for TSD units including requirements covering permitting, interim status, land disposal restrictions, closure, and post-closure ...

  4. The Oak Ridge Reservation PCB Federal Facilities Compliance Agreement...

    Office of Environmental Management (EM)

    payment or obligation of funds by DOE shall be subject to the availability of appropriated funds, and no provision herein shall be interpreted to require the obligation or payment ...

  5. Mound Plant Federal Facility Agreement, July 15, 1993 Summary

    Office of Environmental Management (EM)

    shall be interpreted to require obligation or payment of funds in violation of the Anti-Deficiency Act. In cases where payment of obligation of funds would constitute a ...

  6. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT March...

    Office of Legacy Management (LM)

    ... macroinvertebrate samples l'tojected iiID,ill.l es1lb:i@ o6IB41Q5 d6Z7"2.8p5 ... Condition of: Fence Roads Signs Visible Piping Visible Liner Lire Saver Station Evidence ...

  7. Weldon Spring Site Federal Facility Agreement UNITED STATES ENVIRONMEN...

    Office of Legacy Management (LM)

    ... National Oil and Hazardous Substances Pollution Contingency Plan, 40 C.F.R. Part 300. ... 24.3 Conducting long-term monitoring of air, groundwater, biota or other media ...

  8. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 4 - Nuclear Safety Basis Program Review During Facility Decommissioning and Environmental Restoration February 2015 i Standard Review Plan Volume 4 Nuclear Safety Basis Program Review during Facility Decommissioning and Environmental Restoration Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February

  9. Toxic Substances Control Act Uranium Enrichment Federal Facilities...

    Office of Environmental Management (EM)

    Thomas L. McCall, Jr. http:www.em.doe.govffaaortsca.html 4252001 Toxic Substances Control Act Uranium Enrichment Federal Facilities Compliance Agree.. Page 12 of 26 Deputy ...

  10. Terra-Gen Powers Coso Geothermal Facility Obtains Critical Federal...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Terra-Gen Powers Coso Geothermal Facility Obtains Critical Federal Permit to Increase Its...

  11. FEMP Assisting Federal Facilities with Energy Conservation Technologies Webinar Transcript

    Broader source: Energy.gov [DOE]

    Good afternoon. My name is Courtney Kendall from the National Renewable Energy Laboratory and I'd like to welcome you to today's webinar on AFFECT:  Assisting Federal Facilities with Energy...

  12. Toxic Substances Control Act Uranium Enrichment Federal Facilities...

    Office of Environmental Management (EM)

    Thomas L. McCall, Jr. http:www.em.doe.govffaaortsca.html 4252001 Toxic Substances Control Act Uranium Enrichment Federal Facilities Compliance Agree.. Page 12 of 26 Deputy...

  13. Energy Department Investment Drives Clean Energy Innovation at Federal Facilities

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy today announced $2.85 million in funding for four projects that will advance the development of renewable energy technologies at facilities across the federal government.

  14. FEMP's Assisting Federal Facilities with Energy Conservation Technologies (AFFECT)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFFECT 2016 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) June 8, 2016 David Boomsma AFFECT Program Manager Federal Energy Management Program (FEMP) Energy Efficiency and Renewable Energy Department of Energy Federal Energy Management Program 2 Event Date FOA Issue Date May 26, 2016 Letter of Intent (LOI) Deadline June 27, 2016 5:00pm ET Full Application Deadline July 27, 2016 5:00pm ET Notification of Award Selections October 28, 2016 Timeframe for Award

  15. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 2 -- Nuclear Safety Basis Program Review During Design February 2015 i Standard Review Plan Volume 2 Nuclear Safety Basis Program Review during Design Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms

  16. Waste treatment facility passes federal inspection, completes final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    milestone, begins startup 23, 2012 Media Contact: Danielle Miller, 208-526-5709 Erik Simpson, 208-390-9464 Waste treatment facility passes federal inspection, completes final milestone, begins startup The Idaho site today initiated the controlled, phased startup of a new waste treatment facility scheduled to begin treating 900,000 gallons of radioactive liquid waste stored in underground tanks at a former Cold War spent nuclear fuel reprocessing facility next month. An exterior view of the

  17. Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183- Sep. 19, 2008

    Broader source: Energy.gov [DOE]

    Federal Register Notice of proposed rulemaking and opportunity for comment on the coordination of federal authorizations for electric transmission facilities, September 19, 2008

  18. Environmental partnering at federal facilities success through communications and teamwork

    SciTech Connect (OSTI)

    Ferraro, P.

    1995-12-01

    Construction partnering has been used on many government and private construction projects for at least a decade while environmental partnering at federal facilities has only recently received some attention. The Federal government is exploring how to implement the concepts of environmental partnering at federal facilities. It appears that some federal facilities are utilizing partnering concepts while others are not. Environmental partnering as a federal facility consists of a cooperative effort by all facility stakeholders working as a team to achieve the goal of environmental restoration. The regulatory members must join with other stakeholders in dealing with environmental issues in a timely manner. The key elements of environmental partnering are: commitment, trust, common goals, timely response and continuous evaluation. The partnering process is only a guide since each project or program is unique and the stakeholder will vary requiring a tailored partnering approach. The process consists of: early preparation, identification of stakeholders, management commitments, kick-off meeting or workshop and periodic evaluations. This paper presents the concepts of environmental partnering, including benefits, stakeholders, and the environmental partnering process. It also discusses examples of construction partnering and environmental partnering.

  19. Fernald Triparty Agreement as revised, July 18, 1986 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Facility Compliance Agreement State Ohio Agreement Type Compliance Agreement Legal Driver(s) RCRACERCLACWA Scope Summary Establish a Compliance Plan to ensure compliance...

  20. Guidance for Fast-Track Cooperative Research And Development Agreement (CRADA) Programs at DOE Facilities.

    Broader source: Energy.gov [DOE]

    This AL provides guidance for implementing a new Fast Track CRADA Program (Fast Track or Fast Track Program) at DOE Facilities (i.e., National Laboratories, single-purpose research facilities, and other Department facilities) (Facilities) that streamlines the execution of Cooperative Research and Development Agreements (CRADAs) across the DOE complex.

  1. Requirements and impacts of the Federal Facility Compliance Act on the Department of Energy

    SciTech Connect (OSTI)

    Chang, L.; Tripp, S.C.

    1993-03-01

    The Federal Facilities Compliance Act (FFCA, the Act) was signed into law on October 6, 1992, primarily as a means of waiving sovereign immunity for federal facilities with respect to requirements under the Resource Conservation and Recovery Act. DOE`s implementation of the FFCA will have significant effects on current and future DOE waste management operations. DOE will need to rethink its strategy in the area of future compliance agreements to ensure commitments and deliverables are made consistent throughout the different DOE facilities. Several types of agreements that address mixed waste land disposal restriction (LDR) compliance have already been signed by both DOE and the regulators. These agreements are in place at the Hanford Reservation, the Savannah River Site, the Oak Ridge Reservation (Oak Ridge National Laboratory, K-25, Y-12), and the Paducah Gaseous Diffusion Plant. The Rocky Flats Agreement is now being renegotiated. Los Alamos National Laboratory, Sandia/Albuquerque National Laboratory, Lawrence Livermore National Laboratory, and Idaho National Engineering Laboratory agreements are in progress. Major components of the FFCA include provisions on: sovereign immunity waiver; cost reimbursements; mixed waste requirements, including inventory reports on mixed waste and treatment capacity and technologies; and plans for the development of treatment capacities and technologies. Each of these components is discussed within this paper.

  2. SUSTAINABILITY NEWS Assisting Federal Facilities with Energy Conservation Technologies (AFFECT)

    Energy Savers [EERE]

    Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) DOE's Federal Energy Management Program (FEMP) recently issued a notice of intent to release a Funding Opportunity Announcement (FOA) for its new AFFECT program. The program intends to provide direct funding awards of up to $1 million per project to help finance renewable energy and combined heat and power (CHP) projects. Projects that apply for the funding are expected to leverage other financing mechanisms (such as

  3. Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Judge | Department of Energy Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal Judge Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal Judge October 6, 2010 - 12:00am Addthis RICHLAND, Wash. - The U.S. Department of Energy and Washington State Department of Ecology (Ecology) jointly filed a motion today in U.S. District Court asking the court to approve and enter a judicial consent decree that imposes a new, enforceable, and achievable

  4. High-Efficiency Parking Lighting in Federal Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High-Efficiency Parking Lighting in Federal Facilities FEdEraL EnErgy ManagEMEnt PrograM MC Realty Group Saving Energy and Money with the IRS MC Realty Group, LLC, won a 2014 LEEP Award for cutting energy use by 76% at the Internal Revenue Service (IRS) Facility Parking Garage in Kansas City, Missouri. MC Realty replaced 1,500 metal halide fxtures with an equal number of T8 fuorescent fxtures in the fve-story parking structure to cut energy use by 2 million kilowatt-hours (kWh) annually, which

  5. EISA Federal Facility Management and Benchmarking Reporting Requirements |

    Office of Environmental Management (EM)

    2: Alaska LNG Project, Alaska EIS-0512: Alaska LNG Project, Alaska SUMMARY The Federal Energy Regulatory Commission (FERC) announced its intent to prepare an EIS that assesses the potential environmental impacts to develop, construct, and operate facilities that would commercialize the natural gas resources on Alaska's North Slope. The proposed Alaska LNG Project would include a gas treatment plant, more than 800 miles of natural gas pipeline, liquefaction and storage facilities, an LNG export

  6. Expedited site characterization for remedial investigations at federal facilities

    SciTech Connect (OSTI)

    Burton, J.C.

    1994-04-01

    Argonne National Laboratory`s Expedited Side Characterization (ESC) methodology gives federal agencies a process for producing high-quality CERCLA and RCRA site characterizations and remedial investigations in a cost- and time-efficient manner. The ESC process has been successfully tested and applied at numerous federal facilities. Examples include expanded site investigations for the Department of Interior`s Bureau of Land Management and remedial investigations for the Commodity Credit Corporation/US Dept. of Agriculture (CCC/USDA). In particular, the CCC/USDA has been the major sponsor in the development of the ESC process at Argonne. The technical successes and the cost and time savings of the ESC process for these programs have been detailed in previous papers. The Argonne ESC is currently being implemented at a Department of Energy facility (Pantex) and is schedules for implementation in the Department of Defense base closure program in order to meet accelerated schedules for remedial actions by these agencies.

  7. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    SciTech Connect (OSTI)

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  8. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-25

    The purpose of this Guide is to provide U.S. Department of Energy (DOE) line management with guidance that may be useful to them in effectively and efficiently implementing the requirements of DOE O 226.1B, Implementation of Department of Energy Oversight Policy, date April 25, 2011, as applied to Federal line management of hazard category 1, 2, and 3 nuclear facilities.

  9. Miscellaneous agreements between the U.S. Department of Energy and Federal, State, and local agencies.

    SciTech Connect (OSTI)

    Meincke, Carol L.

    2010-08-01

    This document identifies and provides access to source documentation for the Site- Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico. Specifically, it lists agreements between the U.S. Department of Energy (DOE), the National Nuclear Security Administration (NNSA), DOE/NNSA/Sandia Site Office (SSO), Sandia Corporation, and local and state government agencies, Department of Defense, Kirtland Air Force Base, and other federal agencies.

  10. Agreement

    National Nuclear Security Administration (NNSA)

    ... all levels will apply the terms of this Agreement fairly in ... Laboratories escort to enter work areas in the course of ... or see hbe.sandia.gov and search the term "smoking." * Real ...

  11. California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and Energy Savings

    Broader source: Energy.gov [DOE]

    Fact sheet from the Federal Energy Management Program (FEMP) describes rate-responsive building operations for cost and energy savings in California federal facilities.

  12. AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar Slides

    Broader source: Energy.gov [DOE]

    Webinar slides describe the 2016 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) funding opportunity offered by the Federal Energy Management Program.

  13. Occupational radiation Exposure at Agreement State-Licensed Materials Facilities, 1997-2010

    SciTech Connect (OSTI)

    U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research

    2012-07-07

    The purpose of this report is to examine occupational radiation exposures received under Agreement State licensees. As such, this report reflects the occupational radiation exposure data contained in the Radiation Exposure Information and Reporting System (REIRS) database, for 1997 through 2010, from Agreement State-licensed materials facilities.

  14. Distributed Energy Resources at Federal Facilities. Federal Energy Management Program (FEMP) Technical Assistance Fact Sheet

    SciTech Connect (OSTI)

    Pitchford, P.

    2001-07-16

    This two-page overview describes how the use of distributed energy resources at Federal facilities is being supported by the U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP). Distributed energy resources include both existing and emerging energy technologies: advanced industrial turbines and microturbines; combined heat and power (CHP) systems; fuel cells; geothermal systems; natural gas reciprocating engines; photovoltaics and other solar systems; wind turbines; small, modular biopower; energy storage systems; and hybrid systems. DOE FEMP is investigating ways to use these alternative energy systems in government facilities to meet greater demand, to increase the reliability of the power-generation system, and to reduce the greenhouse gases associated with burning fossil fuels.

  15. DOE uniform reporting system for Federal assistance (grants and cooperative agreements): guidelines

    SciTech Connect (OSTI)

    Not Available

    1981-04-01

    These guidelines establish a uniform reporting system (URS) for grants and cooperative agreements. The purpose is to simplify reporting requirements, standardize reporting, and ensure that no assistance recipient submits more reports than needed to achieve accountability for public funds. This system replaces the many reporting procedures previously imposed by DOE component organizations. Uniform terminology and data elements will minimize ambiguity of meaning and intent. A glossary of terms is provided. A checklist is used to identify all reporting requirements at the time of award. The recipient is encouraged to discuss the requirements before the time of award in order to ensure that they are appropriate. The Guidelines describe planning forms which can be included in the Federal assistance application or proposal to present the planned approach and desired results. Flexibility has been built into the system to ensure that the information requested is relative to the activity performed. A recipient of Federal assistance submits information only once in each reporting period. The reporting system provides recipients with a formal method for identifying problems, including those originated by the Federal government. For purposes of illustration, a hypothetical project - partially funded by DOE under a cooperative agreement - using all the Program Management forms is presented in Part II, Program Management. Part III, Technical Information uses a research grant to illustrate Technical Reporting. Appendix B provides a complete example of the reporting requirements on a research grant.

  16. Tri Party Agreement Administrative Record Presentation for Dennis A. Faulk, EPA Jane A. Hedges, Ecology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TPA) and Milestone Tutorial John Price, Ecology What is it? Hanford Federal Facility Agreement and Consent Order (HFFACO) * Legal Agreement, Parts One - Five - Federal Facility Agreement between US Department of Energy and US Environmental Protection Agency (US DOE and US EPA) - Consent Order between US DOE and Washington Department of Ecology - A 3-party agreement [TPA] on how to integrate the Federal Facility Agreement with the Consent Order Why is there an EPA-DOE Federal Facility Agreement?

  17. Ground-Source Heat Pumps Applied to Federal Facilities - Second Edition

    SciTech Connect (OSTI)

    2001-03-01

    Ground-Source Heat Pumps Applied to Federal Facilities, Second Edition, technology for reducing heating and air-conditioning costs.

  18. Agreement

    Office of Environmental Management (EM)

    Noncompliance Determination (2010-SE-0302) AeroSys: Noncompliance Determination (2010-SE-0302) April 13, 2010 DOE issued a Notice of Noncompliance Determination to AeroSys, Inc. finding that basic model THDC-24SG does not comport with the energy conservation standards. DOE determined the product was noncompliant based on DOE testing. AeroSys must immediately notify each person (or company) to whom AeroSys distributed the noncompliant product that the product does not meet Federal standards. In

  19. Low-Level Waste Disposal Facility Federal Review Group (LFRG) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Program Management » Compliance » Low-Level Waste Disposal Facility Federal Review Group (LFRG) Low-Level Waste Disposal Facility Federal Review Group (LFRG) The Low-Level Waste Disposal Facility Federal Review Group (LFRG) is an independent group within the Office of Environmental Management (EM) that ensures, through review, that Department of Energy (DOE) (including the National Nuclear Security Administration) radioactive waste disposal facilities are protective of the public

  20. The Department of Energy has opted to utilize the following agreement for Designated Non-Proprietary User Facilities transactions

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    agreement for Designated Proprietary User Facilities transactions. Because these transactions are widespread across Departmental facilities, uniformity in agreement terms is desirable. Except for the *** provisions, minor modifications to the terms of this agreement may be made by CONTRACTOR, but any changes to the *** provisions or substantive changes to the non *** provisons will require approval by the DOE Contracting Officer, WHICH WILL LIKEY DELAY YOUR ACCESS TO THE USER FACILITY. In

  1. Search for Efficient Technologies and Products for Federal Facilities

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program provides information and resources about energy- and water-efficient technologies and products that are well suited for federal applications and can help agencies meet federal laws and requirements.

  2. FEMP Helps Federal Facilities Develop Large-Scale Renewable Energy Projects

    Broader source: Energy.gov [DOE]

    FEMP developed a guide to help federal agencies, as well as the developers and financiers that work with them, to successfully install large-scale renewable energy projects at federal facilities.

  3. 2015 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients

    Broader source: Energy.gov [DOE]

    On March 6, 2015, the Federal Energy Management Program (FEMP) issued a funding opportunity announcement (FOA) on the EERE Exchange titled Assisting Federal Facilities with Energy Conservation Technologies (AFFECT), Fiscal Year 2015.

  4. 3rd Annual National CHP Roadmap Workshop CHP and DER for Federal Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA CHP Partnership Meeting, October 2002 | Department of Energy 3rd Annual National CHP Roadmap Workshop CHP and DER for Federal Facilities EPA CHP Partnership Meeting, October 2002 3rd Annual National CHP Roadmap Workshop CHP and DER for Federal Facilities EPA CHP Partnership Meeting, October 2002 This is an announcement of the 3rd Annual National CHP Roadmap Workshop which was held in conjunction with the CHP and Distributed Energy Resources for Federal Facilities Workshop, October 23-25,

  5. EERE Success Story-FEMP Helps Federal Facilities Develop Large-Scale

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewable Energy Projects | Department of Energy FEMP Helps Federal Facilities Develop Large-Scale Renewable Energy Projects EERE Success Story-FEMP Helps Federal Facilities Develop Large-Scale Renewable Energy Projects August 21, 2013 - 12:00am Addthis EERE's Federal Energy Management Program issued a new resource that provides best practices and helpful guidance for federal agencies developing large-scale renewable energy projects. The resource, Large-Scale Renewable Energy Guide:

  6. Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment

    Broader source: Energy.gov [DOE]

    This webinar, held on Sept. 24, 2013, provides information on federal finance facilities available for energy efficiency upgrades and clean energy deployment.

  7. Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment

    Broader source: Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment.

  8. Federal Technical Capability Policy for Defense Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-12-10

    The policy regarding the Federal Technical Capability Program, which provides for the recruitment, deployment, development, and retention of Federal personnel with the demonstrated technical capability to safely accomplish the Departments missions and responsibilities.

  9. The Business Case for Sustainable Design in Federal Facilities

    SciTech Connect (OSTI)

    2003-08-01

    This document provides a better understanding of the Federal government's effort to build a more sustainable real estate portfolio.

  10. Using Distributed Energy Resources, A How-To Guide for Federal Facility Managers

    SciTech Connect (OSTI)

    Distributed Utility Associates

    2002-05-01

    The Department of Energy's Federal Energy Management Program (FEMP) established the Distributed Energy Resources (DER) Program to assist Federal agencies in implementing DER projects at their facilities. FEMP prepared this How-To Guide to assist facility managers in evaluating potential applications and benefits. It provides step-by-step advice on how to carry out a Federal DER project. It also describes and explains DER applications and potential benefits in Federal facilities; DER technologies and how to match them to applications; a step-by-step approach to implementing projects; potential barriers and how to overcome them; and resources to assist you in implementing new DER projects.

  11. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    Volume 3 - Nuclear Safety Basis Program Review During Facility Operations and Transitions February 2015 i Standard Review Plan Volume 3 Nuclear Safety Basis Program Review during Facility Operations and Transitions Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms

  12. Technology Potential of Thermal Energy Storage (TES) Systems in Federal Facilities

    SciTech Connect (OSTI)

    Chvala, William D.

    2001-07-31

    This document presents the findings of a technology market assessment for thermal energy storage (TES) in space cooling applications. The potential impact of TES in Federal facilities is modeled using the Federal building inventory with the appropriate climatic and energy cost data. In addition, this assessment identified acceptance issues and major obstacles through interviews with energy services companies (ESCOs), TES manufacturers, and Federal facility staff.

  13. Testing Promising Technologies: A Role for Federal Facilities

    Broader source: Energy.gov [DOE]

    Presentation covers the testing of promising technologies and is given at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  14. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Broader source: Energy.gov (indexed) [DOE]

    process for successfully planning for and installing solar technology on a federal site. ... The solar project process is outlined in a concise, easy-to-understand, step-by-step ...

  15. EERE Success Story-FEMP Helps Federal Facilities Develop Large...

    Broader source: Energy.gov (indexed) [DOE]

    The Federal Energy Management Program (FEMP) works with key individuals to accomplish ... Addthis Related Articles EERE Success Story-FEMP and U.S. Army Corps of Engineers Partner ...

  16. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-04

    The Guide was developed in support of DOE O 226.1B to provide guidance that may be useful to DOE line management organizations in meeting the provisions of that order when applied to nuclear facilities.

  17. Guidance Regarding Refinancing, Restructuring, or Modifying Loan Agreements Entered into by an Energy Services Company Under a Federal Energy Savings Performance Contract

    Broader source: Energy.gov [DOE]

    Document addresses potential refinancing, restructuring, or modifying of a loan agreement entered into by an energy services company (ESCO) under a federal energy savings performance contract (ESPC).

  18. Procuring Stationary Fuel Cells For CHP: A Guide for Federal Facility Decision Makers

    SciTech Connect (OSTI)

    Stinton, David P; McGervey, Joseph; Curran, Scott

    2011-11-01

    fuel cell projects easier to put into service. In this environment, federal decision makers can focus on being smart buyers of fuel cell energy instead of attempting to become experts in fuel cell technology. For agencies that want to pursue a fuel cell CHP this guide presents a four step process for a successful project. 1. Perform a preliminary screening of the energy needs energy costs and incentives. 2. Compare a detailed project plan. 3. Make a financing and contracting decision. 4. Execute the project plan including financing, installation, and operation. The simplest procurement method is designated funding for the outright purchase of the fuel cell CHP system, although this is usually not the most cost-effective option. This guide describes the following financing options: Power purchase agreement Energy savings performance contract Utility energy services contract Enhanced use lease Fuel cell CHP technology can help federal facility managers comply with agency objectives for reducing energy consumption and air pollution emissions. Fuel cells do not generate particulate pollutants, unburned hydrocarbons or the gases that produce acid rain. Fuel cells emit less carbon dioxide (CO2) than other, less efficient technologies and use of renewable fuels can make them carbon neutral. Fuel cell CHP technology can deliver reliable electricity and heat with high efficiency (70% to 85%) in a small physical footprint with little noise, making it a cost-effective option for federal facilities.

  19. Federal Technology Alert: Ground-Source Heat Pumps Applied to Federal Facilities--Second Edition

    SciTech Connect (OSTI)

    Hadley, Donald L.

    2001-03-01

    This Federal Technology Alert, which was sponsored by the U.S. Department of Energy's Office of Federal Energy Management Programs, provides the detailed information and procedures that a Federal energy manager needs to evaluate most ground-source heat pump applications. This report updates an earlier report on ground-source heat pumps that was published in September 1995. In the current report, general benefits of this technology to the Federal sector are described, as are ground-source heat pump operation, system types, design variations, energy savings, and other benefits. In addition, information on current manufacturers, technology users, and references for further reading are provided.

  20. Performing Energy Security Assessments: A How-To Guide for Federal Facility Managers

    Broader source: Energy.gov [DOE]

    Guide describes the best practices and recommended process for federal facility managers to prepare for the following sections of a facility’s energy security plan: vulnerability assessments, energy preparedness and operations plans, and remedial action plans.

  1. FOA for Assisting Federal Facilities with Energy Conservation Technologies Informational Webinar

    Broader source: Energy.gov [DOE]

    This webinar will highlight the funding opportunity announcement (FOA) that was issued on March 6, 2015. The AFFECT grant will provide funding for renewable energy projects at federal facilities...

  2. New Course Teaches Best Practices for Water Management for Federal Facilities

    Broader source: Energy.gov [DOE]

    FEMP now offers Best Practices for Comprehensive Water Management for Federal Facilities, a new e-Training core course providing skills to increase efficiency and reduce water use through O&M practices and water-efficient technologies.

  3. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    1 -- Nuclear Safety Basis Program Review Overview and Management Oversight February 2015 i Standard Review Plan Volume 1 Nuclear Safety Basis Program Review Overview and Management Oversight Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms ................................................................................................................................... iii

  4. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    5 - Nuclear Safety Basis Program Review of TSRs, USQs and SERs February 2015 i Standard Review Plan Volume 5 Nuclear Safety Basis Program Review of TSRs, USQs and SERs Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms ................................................................................................................................... iii Introduction

  5. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-04-14

    The Guide was developed in support of DOE O 226.1B to provide guidance that may be useful to DOE line management organizations in meeting the provisions of that order when applied to nuclear facilities. Supersedes DOE G 226.1-2

  6. Largest Federally Owned Wind Farm Breaks Ground at U.S. Weapons Facility |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Y-12 National Security Complex Largest Federally Owned ... Largest Federally Owned Wind Farm Breaks Ground at U.S. Weapons Facility Posted: August 13, 2013 - 12:01pm WASHINGTON - Building on President Obama's Climate Action Plan, which calls for steady, responsible steps to reduce carbon pollution, the Energy Department today broke ground on the nation's largest federally owned wind project at the Pantex Plant in Amarillo, Texas. Once completed, this five-turbine 11.5 megawatt project will

  7. PFP Tentative Agreement.PDF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AGREEMENT ON NEGOTIATIONS FOR THE PLUTONIUM FINISHING PLANT PROJECT In accordance with the requirements of the Plutonium Finishing Plant (PFP) Agreement in Principle, the State of Washington Department of Ecology (Ecology), the U.S. Environmental Protection Agency (EPA), and the U.S. Department of Energy (DOE) (Parties) have concluded negotiations on the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Section 8 commitments for transition and selected dispositio n

  8. TENTATIVE AGREEMENT ON NEGOTIATIONS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ON NEGOTIATIONS Acceleration of K Basins Sludge Treatment and Disposal, Basin Remediation, and Delay in Sludge Retrieval The U.S. Department of Energy, Richland Operations Office (RL) and the U.S. Environmental Protection Agency (EPA) have concluded negotiations on the Hanford Federal Facility Agreement and Consent Order (Tri- Party Agreement) M-034 and M-016 commitments for removal of sludge, debris, water and the K Basins. The M-016 commitments involve the removal of the basins and initiate

  9. Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: January-March 2016

    Office of Legacy Management (LM)

    6 April 2016 LMS/MNT/S14013 This page intentionally left blank U.S. Department of Energy Monticello NPL Sites FFA Quarterly Report: January-March 2016 April 2016 Doc. No. S14013 Page i Contents Abbreviations .................................................................................................................................. ii 1.0 Introduction ............................................................................................................................1 1.1 Quarterly

  10. Federal Facility Agreement for the Laboratory for Energy-Related Health Research

    Office of Environmental Management (EM)

  11. Federal Facility Agreement for the Oak Ridge Reservation, January 1, 1992

    Office of Environmental Management (EM)

  12. Savannah River Site Federal Facility Agreement, January 15, 1993 (First Half)

    Office of Environmental Management (EM)

  13. Savannah River Site Federal Facility Agreement, January 15, 1993 (Second Half)

    Office of Environmental Management (EM)

  14. The Oak Ridge Reservation PCB Federal Facilities Compliance Agreement, October 28, 1996

    Office of Environmental Management (EM)

    The Inside of a Wind Turbine The Inside of a Wind Turbine 1 of 17 Tower: 2 of 17 Tower: Made from tubular steel (shown here), concrete, or steel lattice. Supports the structure of the turbine. Because wind speed increases with height, taller towers enable turbines to capture more energy and generate more electricity. Generator: 3 of 17 Generator: Produces 60-cycle AC electricity; it is usually an off-the-shelf induction generator. High-speed shaft: 4 of 17 High-speed shaft: Drives the generator.

  15. U.S. Federal Facility Compliance Agreement for the Hanford Site, February 7, 1994

    Office of Environmental Management (EM)

    Research and Development Initiative | Department of Energy Agriculture and Energy Announce Funding for Biomass Research and Development Initiative U.S. Departments of Agriculture and Energy Announce Funding for Biomass Research and Development Initiative April 15, 2011 - 12:00am Addthis WASHINGTON, April 15, 2011- To support President Obama's goal of reducing America's oil imports by one-third by 2025, the U.S. Departments of Agriculture (USDA) and Energy (DOE) today jointly announced up to

  16. U.S. Federal Facility Compliance Agreement for the Hanford Site...

    Office of Environmental Management (EM)

    shall be interpreted to require obligation or payment of funds in violation of the Anti-Deficiency Act. In cases where payment or obligation of funds would constitute a ...

  17. Federal Facility Agreement Annual Progress Report for Fiscal Year 1999 Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs Company LLC

    2000-01-01

    The U.S. Department of Energy-Oak Ridge Operations (DOE-ORO) EM Program adopted a watershed approach for performing Remedial Investigations (RIs) and characterizations for ORR because it is an effective system for determining the best methods for protecting and restoring aquatic ecosystems and protecting human health. The basic concept is that water quality and ecosystem problems are best solved at the watershed level rather than at the individual water-body or discharger level. The watershed approach requires consideration of all environmental concerns, including needs to protect public health, critical habitats such as wetlands, biological integrity, and surface and ground waters. The watershed approach provides an improved basis for management decisions concerning contaminant sources and containment. It allows more direct focus by stakeholders on achieving ecological goals and water quality standards rather than a measurement of program activities based on numbers of permits or samples. The watershed approach allows better management strategies for investigations, therefore maximizing the utilization of scarce resources. Feasibility studies (FSs) evaluate various alternatives in terms of environmental standards, the protection of human health and the environment, and the costs of implementation to find the optimum solution among them. Society has to decide how much it is willing to spend to meet the standards and to be protective. Conducting FSs is the process of trading off those criteria to pick that optimum point that society wants to achieve. Performing this analysis at the watershed scale allows those trade-offs to be made meaningfully. In addition, a Land Use Control Assurance Plan for the ORR was prepared to identify the strategy for assuring the long-term effectiveness of land use controls. These land use controls will be relied upon to protect human health and the environment at areas of the ORR undergoing remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act and/or the Resource Conservation and Recovery Act. This plan will be implemented by means of a Memorandum of Understanding (MOU) incorporating its terms with the United States EPA and TDEC. The majority of projects described in this report are grouped into five watersheds. They are the East Tennessee Technical Park (ETTP) Watershed (formerly the K-25 Site), the Melton Valley (MV) and Bethel Valley (BV) Watersheds at the Oak Ridge National Laboratory (ORNL), and the Bear Creek Valley (BCV) and Upper East Fork Poplar Creek (UEFPC) Watersheds at the Y-12 Plant.

  18. Large-Scale Renewable Energy Guide: Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    Broader source: Energy.gov [DOE]

    The Large-Scale Renewable Energy Guide: Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities provides best practices and other helpful guidance for federal agencies developing large-scale renewable energy projects.

  19. Guidance Regarding Refinancing, Restructuring, or Modifying Loan Agreements Entered into by an Energy Services Company Under a Federal Energy Savings Performance Contract

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regarding Refinancing, Restructuring, or Modifying Loan Agreements Entered into by an Energy Services Company Under a Federal Energy Savings Performance Contract This FEMP guidance addresses potential refinancing, restructuring, or modifying of loan agreements (collectively called a "debt modification") entered into by an Energy Services Company (ESCO) under federal Energy Savings Performance Contracts (ESPCs). In considering the impact of debt modifications on ESPCs, it is important

  20. 2014 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients

    Office of Energy Efficiency and Renewable Energy (EERE)

    On November 5, 2013, FEMP issued a funding opportunity announcement (FOA) on the EERE Exchange titled Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) DE-FOA-0000901. The release of the FOA followed the notice of intent, which was issued on July 9, 2013. On September 22, 2014, FEMP announced the following nine AFFECT projects.

  1. Energy Department Announces $5 Million to Develop Clean Energy Projects at Federal Facilities

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Energy Department today announced $5 million in funding for nine projects that will advance the development of combined heat and power (CHP) and renewable energy technologies at facilities across the federal government and help meet energy efficiency, renewable energy, and greenhouse gas reduction goals.

  2. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    SciTech Connect (OSTI)

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall

  3. California Federal Facilities: Rate-Responsive Building Operation for Deeper Cost and Energy Savings

    SciTech Connect (OSTI)

    2012-05-01

    Dynamic pricing electricity tariffs, now the default for large customers in California (peak demand of 200 kW and higher for PG&E and SCE, and 20 kW and higher for SDG&E), are providing Federal facilities new opportunities to cut their electricity bills and help them meet their energy savings mandates. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) has created this fact sheet to help California federal facilities take advantage of these opportunities through “rate-responsive building operation.” Rate-responsive building operation involves designing your load management strategies around your facility’s variable electric rate, using measures that require little or no financial investment.

  4. Uranium-Loaded Water Treatment Resins: 'Equivalent Feed' at NRC and Agreement State-Licensed Uranium Recovery Facilities - 12094

    SciTech Connect (OSTI)

    Camper, Larry W.; Michalak, Paul; Cohen, Stephen; Carter, Ted

    2012-07-01

    Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly and the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)

  5. Federal Facility Compliance Act, Proposed Site Treatment Plan: Background Volume. Executive Summary

    SciTech Connect (OSTI)

    1995-03-24

    This Federal Facility Compliance Act Site Treatment Plan discusses the options of radioactive waste management for Ames Laboratory. This is the background volume which discusses: site history and mission; framework for developing site treatment plans; proposed plan organization and related activities; characterization of mixed waste and waste minimization; low level mixed waste streams and the proposed treatment approach; future generation of TRU and mixed wastes; the adequacy of mixed waste storage facilities; and a summary of the overall DOE activity in the area of disposal of mixed waste treatment residuals.

  6. Mr. Tim Murphy, Chief Bureau of Federal Facilities Division of Environmental Protection

    Office of Legacy Management (LM)

    Tim Murphy, Chief Bureau of Federal Facilities Division of Environmental Protection 2030 E. Flamingo Road, Suite 230 Las Vegas, NV 89119-0818 October 11, 2011 PATH FORWARD: 2011 SHORT-TERM DATA ACQUISITION PLAN PROJECT SHOAL AREA, SUB SURF ACE CORRECTIVE ACTION UNIT 447, NEVADA Dear Mr. Murphy: The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is providing this Short-Term Data Acquisition Plan for the Project Shoal Area (Shoal), Subsurface Corrective Action Unit 447, near

  7. Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1

    SciTech Connect (OSTI)

    1994-08-31

    This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

  8. Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers OCTOBER 2011 Fuel Cell Technologies Program Oak Ridge National Laboratory 2 October 2011 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or

  9. Buildings Energy Data Book: 4.3 Federal Buildings and Facilities Expenditures

    Buildings Energy Data Book [EERE]

    2 Annual Energy Expenditures per Gross Square Foot of Federal Floorspace Stock, by Year ($2010) FY 1985 2.13 FY 2000 1.36 FY 2001 1.58 FY 2002 1.49 FY 2003 1.45 FY 2004 1.54 FY 2005 1.59 FY 2006 2.01 (1) FY 2007 2.01 Note(s): Source(s): Total Federal buildings and facilities energy expenditures in FY 2006 were $5.79 billion (in $2010). 1) Increase due to change in FEMP categorization of Federal buildings. DOE/FEMP, Annual Report to Congress on FEMP FY 2007, Jan. 2010, Table A-9, p. 97 and Table

  10. Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities

    Broader source: Energy.gov [DOE]

     Proposed Coordination of Federal Authorizations for Electric Transmission Facilities – Interim Final Rule and Proposed Rule (DOE, 10 CR Part 900): The utility operating companies of the American...

  11. Buildings Energy Data Book: 4.2 Federal Buildings and Facilities Characteristics

    Buildings Energy Data Book [EERE]

    2 Federal Buildings and Facilities Characteristics March 2012 4.2.1 Federal Building Gross Floorspace, by Year and Agency Fiscal Year Agency FY 1985 3.37 DOD 63% FY 1986 3.38 USPS 10% FY 1987 3.40 GSA 6% FY 1988 3.23 VA 5% FY 1989 3.30 DOE 3% FY 1990 3.40 Other 13% FY 1991 3.21 Total 100% FY 1992 3.20 FY 1993 3.20 FY 1994 3.11 FY 1995 3.04 FY 1996 3.03 FY 1997 3.02 FY 1998 3.07 FY 1999 3.07 FY 2000 3.06 FY 2001 3.07 FY 2002 3.03 FY 2003 3.04 FY 2004 2.97 FY 2005 2.96 FY 2006 3.10 FY 2007 3.01

  12. California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and Energy Savings

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rouggly, energy manager at SSA's Frank Hagel Federal Building in Richmond California, reports that the facility garnered $35,000 in credits in 2011 on PG&E's Peak Day Pricing (PDP) tariff. "Frankly I was stunned! It's getting a lot of positive attention with our management," said Rouggly. "We were able to drop 400 kW by pre-cooling the building and shutting down one chiller during peak events. We also turned off 2 of our 8 elevators and reduced lighting in corridors to

  13. Ms. Chris Andres, Chief Bureau of Federal Facilities Division of Environmental Protection

    Office of Legacy Management (LM)

    Ms. Chris Andres, Chief Bureau of Federal Facilities Division of Environmental Protection 2030 E. Flamingo Road, Suite 230 Las Vegas, NV 89119-0818 June 16,2014 PATH FORWARD: 2014 SHORT-TERM DATA ACQUISITION PLAN PROJECT SHOAL AREA, SUB SURF ACE CORRECTIVE ACTION UNIT 44 7, NEVADA Dear Ms. Andres: The U.S. Departtnent of Energy (DOE) Office of Legacy Management (LM) is providing this Short- Term Data Acquisition Plan for the Shoal, Nevada, Site, Subsurface Corrective Action Unit 447, near

  14. EIS-0412: Federal Loan Guarantee to Support Construction of the TX Energy LLC, Industrial Gasification Facility near Beaumont, Texas

    Broader source: Energy.gov [DOE]

    The Department of Energy is assessing the potential environmental impacts for its proposed action of issuing a Federal loan guarantee to TX Energy, LLC (TXE). TXE submitted an application to DOE under the Federal loan guarantee program pursuant to the Energy Policy Act of 2005 (EPAct 2005) to support construction of the TXE industrial Gasification Facility near Beaumont, Texas.

  15. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    SciTech Connect (OSTI)

    Moss, R. H.; Delgado, A.; Malone, E L.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  16. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010

    Broader source: Energy.gov [DOE]

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  17. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Appendix B, September 2010

    Broader source: Energy.gov [DOE]

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  18. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  19. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

    SciTech Connect (OSTI)

    Stoltenberg, B.; Partyka, E.

    2010-09-01

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  20. Federal Facility Compliance Act: Conceptual Site Treatment Plan for Lawrence Livermore National Laboratory, Livermore, California

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The Department of Energy (DOE) is required by section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (the Act), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The Act requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the State or EPA for approval, approval with modification, or disapproval. The Lawrence Livermore National Laboratory (LLNL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the Act and is being provided to California, the US Environmental Protection Agency (EPA), and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix 1.1 of this document. Please note that Appendix 1.1 appears as Appendix A, pages A-1 and A-2 in this document.

  1. Tri-Party Agreement for Energy Savings Performance Contracts | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Tri-Party Agreement for Energy Savings Performance Contracts Tri-Party Agreement for Energy Savings Performance Contracts Document outlines processes and considerations to help federal agencies begin planning a U.S. Department of Energy (DOE) energy savings performance contract (ESPC). The tri-party agreement is for use by DOE sites and facilities that are government-owned, contractor-operated (GOCO). They can be modified to support any federal agencies that also may have GOCO

  2. Chiller Controls-related Energy Saving Opportunities in FederalFacilities

    SciTech Connect (OSTI)

    Webster, Tom

    2003-01-01

    Chillers are a significant component of large facility energy use. The focus of much of the development of chilled water systems in recent years has been on optimization of set point and staging controls, improvements in chiller design to increase efficiency and accommodate chlorofluorocarbon (CFC) refrigerant replacements. Other improvements have been made by upgrading controls to the latest digital technologies, improving access and monitoring via communications and sophisticated liquid crystal displays (LCD), more robust fault diagnostics and operating and maintenance information logging. Advances have also been made in how chiller plant systems are designed and operated, and in the diversity of chiller products that are available to support innovative approaches. As in many industries, these improvements have been facilitated by advances in, and lower costs for, enabling technologies, such as refrigerants, compressor design, electronics for controls and variable frequency drives (VFD). Along with the improvements in electronics one would expect that advances have also been made in the functionality of unit controls included with chillers. Originally, the primary purpose of this project was to investigate the state of practice of chiller unit controllers in terms of their energy saving capabilities. However, early in the study it was discovered that advances in this area did not include incorporation of significantly different capabilities than had existed 10-15 years ago. Thus the scope has been modified to provide an overview of some of the basic controls-related energy saving strategies that are currently available along with guideline estimates of their potential and applicability. We have minimized consideration of strategies that could be primarily implemented via design practices such as chiller selection and plant design, and those that can only be implemented by a building management system (BMS). Also, since most of the floor space of federal buildings

  3. Buildings Energy Data Book: 4.4 Legislation Affecting Energy Consumption of Federal Buildings and Facilities

    Buildings Energy Data Book [EERE]

    3 Energy Independence and Security Act of 2007, Provisions Affecting Energy Consumption in Federal Buildings Source(s): Standard Relating to Solar Hot Water - Requires new Federal buildings, or Federal buildings undergoing major renovations, to meet at least 30 percent of hot water demand through the use of solar hot water heaters, if cost-effective. [Section 523] Federally-Procured Appliances with Standby Power - Requires all Federal agencies to procure appliances with standby power consumption

  4. Tentative Agreement as it went to public comment.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tentative Agreement on Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Negotiations on the Overall Strategy and Approach for Hanford Groundwater Protection, Monitoring and Remediation (Tri-Party Agreement Milestone Series M-024) The U.S. Department of Energy, Richland Operations Office (RL), the State of Washington, Department of Ecology, and the U.S. Environmental Protection Agency (EPA), hereinafter referred to as the parties, have concluded negotiations on an

  5. Buildings Energy Data Book: 4.4 Legislation Affecting Energy Consumption of Federal Buildings and Facilities

    Buildings Energy Data Book [EERE]

    2 Executive Order 13423, Provisions Affecting Energy Consumption in Federal Buildings Source(s): -- Requires Federal agencies to improve energy efficiency and reduce greenhouse gas emissions by either 3 percent annual reductions through FY 2015, or by 30 percent by 2015, as compared to FY 2003. -- Requires Federal agencies to obtain at least half of required renewable energy from new renewable sources. Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation

  6. Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: July 1…September 30, 2015

    Office of Legacy Management (LM)

    (FFA) Quarterly Report: July 1-September 30, 2015 October 2015 LMS/MNT/S13350 This page intentionally left blank U.S. Department of Energy Monticello NPL Sites FFA Quarterly Report: July-September 2015 October 2015 Doc. No. S13350 Page i Contents Abbreviations .................................................................................................................................. ii 1.0 Introduction

  7. Report on the Effect the Low Enriched Uranium Delivered Under the Highly Enriched Uranium Agreement Between the Government of the United States and the Government of the Russian Federation has on the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report on the Effect the Low Enriched Uranium Delivered Under the Highly Enriched Uranium Agreement Between the Government of the United States of America and the Government of the Russian Federation has on the Domestic Uranium Mining, Conversion, and Enrichment Industries and the Operation of the Gaseous Diffusion Plant 2008 Information Date: December 31, 2008 1 Introduction The Agreement Between the Government of the United States of America and the Government of the Russian Federation

  8. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    SciTech Connect (OSTI)

    Not Available

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

  9. Buildings Energy Data Book: 4.4 Legislation Affecting Energy Consumption of Federal Buildings and Facilities

    Buildings Energy Data Book [EERE]

    1 Energy Policy Act of 2005, Provisions Affecting Energy Consumption in Federal Buildings Source(s): Energy Management Requirements - Amended reduction goals set by the National Energy Conservation Policy Act, and requires increasing percentage reductions in energy consumption through FY 2015, with a final energy consumption reduction goal of 20 percent savings in FY 2015, as compared to the baseline energy consumption of Federal buildings in FY 2003. (These goals were superseded by Section 431

  10. Federated Wind Farm | Open Energy Information

    Open Energy Info (EERE)

    Federated Wind Farm Jump to: navigation, search Name Federated Wind Farm Facility Federated Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner...

  11. Notice of Intent to Revise DOE G 226.1-2, Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-04

    This revision will incorporate new content devoted to Federal oversight and evaluation of effectiveness of activity-level work planning and control (WP&C) at Hazard Category 1, 2, and 3 nuclear facilities.

  12. Federal Sector

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News & Events Skip navigation links Residential Commercial Industrial Federal Agriculture About five percent of BPA's total electric supply goes to power facilities around...

  13. Guidebook to excellence: A directory of federal facilities and other resources for mathematics and science education improvement. [Contains acronym list

    SciTech Connect (OSTI)

    Shipman, T.

    1993-01-01

    The Guidebook to Excellence is a State-by-State directory of Federal facilities and other resources for improving mathematics and science education. This directory, the first of its kind, is being published to assist educators, parents, and students across the country in attaining the National Education Goals, particularly Goal No. 4: By the year 2000, US students will be first in the world in science and mathematics achievement. Some of the larger research facilities in this directory, such as those of NASA, EPA and the Departments of Energy, Commerce, and the Interior, provide a wide range of education programs, and some offer students and teachers hands on experience with state-of-the-art research in world class facilities. Other sites, such as those of the Department of Transportation or Agriculture may be quite small, but can provide assistance in a single field of research or workforce expertise. Also listed are individuals responsible for State or regional coordination of major programs, such as the US Department of Education's Eisenhower Mathematics and Science Education Program, or the National Science Foundation's Statewide Systemic Initiative Program. In addition, each State listing includes facilities or coordinators providing regional assistance from neighboring States.

  14. Proprietary User Agreement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Alliance/NREL 10-12-15 The Department of Energy has opted to utilize the following agreement for Designated Proprietary User Facilities transactions. Because these transactions are widespread across Departmental facilities, uniformity in agreement terms is desirable. Except for the *** provisions, minor modifications to the terms of this agreement may be made by CONTRACTOR, but any changes to the *** provisions or substantive changes to the non *** provisions will require approval by the DOE

  15. Buildings Energy Data Book: 4.3 Federal Buildings and Facilities Expenditures

    Buildings Energy Data Book [EERE]

    3 Direct Appropriations on Federal Buildings Energy Conservation Retrofits and Capital Equipment ($2010 Million) FY 1985 FY 1986 FY 1987 FY 1988 FY 1989 FY 1990 Source(s): DOE/FEMP, Annual Report to Congress on FEMP FY 2007, Jan. 2010, Table 11-B, p. 31; DOE/FEMP, Annual Report to Congress on FEMP, Nov. 2007, Table 9-B, p. 26 for 1985, 1990, 1995, 2000-2006; DOE/FEMP, Annual Report to Congress on FEMP, Sep. 2004, Table 4-B, p. 38 for 1986-1989, 1991-1994, 1996-1999; EIA, Annual Energy Review

  16. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA White Sands Test Facility

    SciTech Connect (OSTI)

    Stephen Schey; Jim Francfort

    2014-10-01

    This report focuses on the NASA White Sands Test Facility (WSTF) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

  17. Buildings Energy Data Book: 4.3 Federal Buildings and Facilities Expenditures

    Buildings Energy Data Book [EERE]

    1 FY 2007 Federal Buildings Energy Prices and Expenditures, by Fuel Type ($2010) Fuel Type Electricity 23.68 (1) 4,009 Natural Gas 9.37 1,138 Fuel Oil 15.25 419 Coal 3.62 63 Purchased Steam 24.30 318 LPG/Propane 17.06 44 Other 16.19 37 Average 17.05 Total 6,029 Note(s): Source(s): Average Fuel Prices Total Expenditures ($/million BTU) ($ million) (2) Prices and expenditures are for Goal-Subject buildings. 1) $0.0776/kWh. 2) Energy used in Goal-Subject buildings in FY 2007 accounted for 33.8% of

  18. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2003 Annual Report.

    SciTech Connect (OSTI)

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    2004-02-01

    The 2003 spring flows were within 7 kcfs of last year's flows, but the summer flows were significantly lower, averaging 194 kcfs compared to 278 kcfs last year. Late summer and fall flows were within 20 kcfs of last year's flows. These flow levels provided good migration conditions for juvenile salmonids, comparable to last year, except in June and July. Monthly average river flows were lower than the historical averages. The number of fish handled at John Day decreased from 257,741 last year to 166,209 this year. Part of this decline is due to reduced research effort which lowers the total number of fish needed. Descaling, compared to last year, varied by species, increasing for yearling chinook and clipped and unclipped steelhead, decreasing for coho and sockeye, and remaining about the same for subyearling chinook. Descaling was well below the average for the airlift years for all species except unclipped steelhead. This may be a function of unclipped hatchery steelhead being counted as unclipped steelhead, a category traditionally reserved for wild steelhead. Mortality continues to be low, at or below last year's levels for yearling chinook, subyearling chinook, clipped steelhead and sockeye; slightly higher than last year for unclipped steelhead and coho. With the exception of sockeye, mortality rates at the new facility are well below the average for the years of sampling with the airlift system. The spring migrants generally started migrating later and finished earlier, for a shorter overall duration. Sub-yearling chinook did just the opposite, starting earlier and ending later for a longer middle 80% duration. This was the fourth year of index level sampling at the Hamilton Island Juvenile Monitoring Facility at Bonneville. The number of fish handled declined from 85,552 last year to 80,303 this year. Descaling for all species was similar to the previous two years (within 2%) but in all cases lower than the historical average. Mortality was lower than last

  19. VPP Interagency Agreement Between DOE and DOL

    Broader source: Energy.gov [DOE]

    The purpose of thia agreement ie for the U. S. Department Of Labor's (DOL) Occupational Safety and Health Administration (OSHA) Directorate of Federal-State Operation8 (FSO) to provide aeeistance to the U. S. Department of Energy’s (DOE) Office of Occupational safety (EH-31) in the development bf the DOE Voluntary Protection Program (DOE-WP) at Government-~ned-or-LeaBed Contractor-Operated (GOCO) facilities.

  20. Power Purchase Agreements

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Power Purchase Agreements Chandra Shah, NREL 303-384-7557 chandra.shah@nrel.gov February 2011 revised 2 | Federal Energy Management Program eere.energy.gov Overview * Customer-sited power purchase agreement (PPA) definition * Project process * Project examples * Utility Renewable Energy Services Contract (URESC) * Enhanced use lease (EUL) * PPA support, resources and key points 3 | Federal Energy Management Program eere.energy.gov * Private entity purchases, installs, owns, operates and

  1. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2004-2005 Annual Report.

    SciTech Connect (OSTI)

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    2005-02-02

    yearling Chinook and unclipped steelhead runs took longer to pass Bonneville than any previous year, at 44 and 45 days, respectively. For subyearling Chinook, the middle 80% of the fish passed during the last three weeks of June and the first week of July, taking 35 days to pass the project, the same as last year. Descaling for all species was slightly higher than the average of the last five years. Compared to last year, descaling varied by species, increasing for yearling Chinook, coho, and sockeye and lower for subyearling Chinook and steelhead. Since sampling began in the juvenile monitoring facility, descaling has been quite consistent, staying below 3.6% for yearling and subyearling Chinook, unclipped steelhead and coho, and above 4.7% for clipped steelhead and sockeye. Mortality was slightly higher than last year and the historical average for yearling and subyearling Chinook and steelhead. Coho and sockeye mortality was lower than last year and the historical average. Mortality for all species was below 1%. Powerhouse 2 operational priority and research results showing higher survival of fish passing through the PH1 turbines rather than through the bypass system resulted in a complete disuse of the PH1 bypass system. Consequently, we removed the historic PH1 data from this report and refer readers to any prior report for information regarding first powerhouse fish sampling.

  2. Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities Facilities LANL's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Los Alamos National Laboratory (505) 667-5061 Some LANL facilities are available to researchers at other laboratories, universities, and industry. Unique facilities foster experimental science, support the Lab's security mission

  3. Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Secure and Sustainable Energy Future Mission/Facilities Facilities Tara Camacho-Lopez 2016-04-06T18:06:13+00:00 National Solar Thermal Test Facility (NSTTF) facility_nsttf_slide NSTTF's primary goal is to provide experimental engineering data for the design, construction, and operation of unique components and systems in proposed solar thermal electrical plants, which have three generic system architectures: line-focus (trough and continuous linear Fresnel reflector systems), point-focus central

  4. Decommissioning of German Nuclear Research Facilities under the Governance of the Federal Ministry of Education and Research

    SciTech Connect (OSTI)

    Weigl, M. [Forschungszentrum Karlsruhe GmbH, Projekttragerforschungszentrum Karlsruhe (PTKA-WTE), Karlsruhe (Germany)

    2008-07-01

    Since the announcement of the first nuclear program in 1956, nuclear R and D in Germany has been supported by the Federal Government under four nuclear programs and later on under more general energy R and D programs. The original goal was to help German industry to achieve safe, low-cost generation of energy and self-sufficiency in the various branches of nuclear technology, including the fast breeder reactor and the fuel cycle. Several national research centers were established to host or operate experimental and demonstration plants. These are mainly located at the sites of the national research centers at Juelich and Karlsruhe. In the meantime, all these facilities were shut down and most of them are now in a state of decommissioning and dismantling (D and D). Meanwhile, Germany is one of the leading countries in the world in the field of D and D. Two big demonstration plants, the Niederaichbach Nuclear Power Plant (KKN) a heavy-water cooled pressure tube reactor with carbon-dioxide cooling and the Karlstein Superheated Steam Reactor (HDR) a boiling light water reactor with a thermal power of 100 MW, are totally dismantled and 'green field' is reached. For two other projects the return to 'green field' sites will be reached by the end of this decade. These are the dismantling of the Multi-Purpose Research Reactor (MZFR) and the Compact Sodium Cooled Reactor (KNK) both located at the Forschungszentrum Karlsruhe. Within these projects a lot of new solutions und innovative techniques were tested, which were developed at German universities and in small and medium sized companies mostly funded by the Federal Ministry of Education and Research (BMBF). For example, high performance underwater cutting technologies like plasma arc cutting and contact arc metal cutting. (authors)

  5. GSA-Utility Interconnection Agreements

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—covers the General Service Administration's (GSA's) utility interconnection agreements.

  6. Interconnection Agreements for Onsite Generation

    Broader source: Energy.gov [DOE]

    Presentation covers Interconnection Agreements for Onsite Generation and is given at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  7. Commissioning for Federal Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... efficiency and working condi- tions. 99 100 Retrocommissioning Process The CxA ... Site Assessment According to NFPA Standard 70B, "as soon as new (electrical) equip- ment ...

  8. Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facilities The the WTGa1 turbine (aka DOE/SNL #1) retuns to power as part of a final series of commissioning tests. Permalink Gallery First Power for SWiFT Turbine Achieved during Recommissioning Facilities, News, Renewable Energy, SWIFT, Wind Energy, Wind News First Power for SWiFT Turbine Achieved during Recommissioning The Department of Energy's Scaled Wind Farm Technology (SWiFT) Facility reached an exciting milestone with the return to power production of the WTGa1 turbine (aka DOE/SNL #1)

  9. Agreement Mechanisms

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement Mechanisms Agreement Mechanisms World-class experts and capabilities countering all aspects of explosive threats, and aiming predominantly at enhanced detection capabilities. CRADA: Cooperative Research and Development Agreement What is it? Work performed in collaboration with a sponsor. What does it do? Enables Los Alamos staff to participate with industry, academia, and nonprofit entities on collaborative R&D activities of mutual benefit. When is it used? An organization's

  10. Agreement Matrix

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    be limited to 5 years. Certification: The Lab provided this DOE technology transfer matrix and explained all the options available including the availability of WFO agreements...

  11. Non-Proprietary User Agreement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Non-Proliferation Treaty

    Alliance/NREL 1-21-16 The Department of Energy has opted to utilize the following agreement for Designated Non-Proprietary User Facilities transactions. Because these transactions are widespread across Departmental facilities, uniformity in agreement terms is desirable. Except for the *** provisions, minor modifications to the terms of this agreement may be made by CONTRACTOR, but any changes to the *** provisions or substantive changes to the non *** provisons will

  12. LES' URENCO-USA Facility | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LES' URENCO-USA Facility LES' URENCO-USA Facility PowerPoint slides on LES's URENCO-USA Facility LES' URENCO-USA Facility (581.43 KB) More Documents & Publications 2014 Review of the Potential Impact of DOE Excess Uranium Inventory On the Commercial Markets Memorandum Memorializing Ex Parte Communication Report on the Effect the Low Enriched Uranium Delivered Under the Highly Enriched Uranium Agreement Between the USA and the Russian Federation has on the Domestic Uranium Mining, Conversion,

  13. NETLMemorandum of Understanding or Agreement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Memorandum of Understanding or Agreement Memorandums of Understanding (MOUs) OR Memorandums of Agreement (MOAs) are written agreements between NETL and other entities that state of scope of work for a specific project or state the terms of a partnering relationship. Parties to these agreements may include other federal agencies, local, state, international, or other government entities; the private sector; and educational institutions. An MOU or MOA is not considered a binding contract. It

  14. Program management plan for development, demonstration, testing, and evaluation efforts associated with Oak Ridge Reservation`s Land Disposal Restrictions Federal Facility Compliance Agreement

    SciTech Connect (OSTI)

    Conley, T.B.

    1994-04-01

    This program management plan covers the development, demonstration, testing, and evaluation efforts necessary to identify treatment methods for all the waste listed in Appendix B of the ORR`s LDR/FFCA as well as any new wastes which meet Appendix B criteria. To successfully identify a treatment method, at least a proof-of-principle level of understanding must be obtained: that is, the candidate processes must be demonstrated as effective in treating the wastes to the LDR; however, an optimized process is not required. Where applicable and deemed necessary and where the budgets will support them, pilot-scale demonstrations will be pursued. The overall strategy being adopted in this program will be composed of the following activities: Scoping of the study; characterization; development and screening of alternatives; treatability investigations; and detailed analysis of alternatives.

  15. User Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Facilities User Facilities User facility agreements allow Los Alamos partners and other entities to conduct research at our unique facilities. In 2011, LANL hosted more than 1,200 users at CINT, LANSCE, and NHMFL. Users came from across the DOE complex, from international academia, and from industrial companies from 45 states across the U.S. Unique world-class user facilities foster rich research opportunities Through its technology transfer efforts, LANL can implement user facility

  16. Denver Federal Center Solar Park | Open Energy Information

    Open Energy Info (EERE)

    Federal Center Solar Park Jump to: navigation, search Name Denver Federal Center Solar Park Facility Denver Federal Center Sector Solar Facility Type Photovoltaic Owner SunEdison...

  17. Prototype Programmatic Agreement Guidance

    Broader source: Energy.gov [DOE]

    Prototype programmatic agreements are a type of program alternative that the Advisory Council on Historic Preservation (ACHP) can designate to assist federal agencies in their efforts to comply with the requirements of Section 106 of the National Historic Preservation Act (16 U.S.C. 470f) and its implementing regulations (36 CFR Part 800). Prototype agreements may be used for the same type of program or undertaking in more than one case or area, and typically establish efficiencies and protocols for implementing these undertakings. This ACHP guidance describes the process for developing prototype agreements, the involvement of interested parties, and other important components to be considered when exploring the use of a prototype agreement as a program alternative.

  18. Memorandum of Understanding Regarding Coordination in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, ...

  19. Coordination of Federal Authorizations for Electric Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183 - Sep. 19, 2008 Coordination of Federal Authorizations for...

  20. Tri-Party Agreement databases, access mechanism and procedures

    SciTech Connect (OSTI)

    Brulotte, P.J.; Christensen, K.C.

    1993-10-01

    This document contains the information required for the Washington State Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA) to access databases related to the Hanford Federal Facility Agreement and Consent Order [also known as the Tri-Party Agreement (TPA)] (Ecology et al. 1992). It identifies the procedure required to obtain access to the Hanford computer networks and the TPA related databases. It addresses security requirements, access methods, database availability dates, database access procedures, and the minimum computer hardware and software configurations required to operate within the Hanford networks.

  1. On-Site Renewable Power Purchase Agreements for Renewable Energy Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    An on-site renewable power purchase agreement (PPA) enables Federal agencies to fund a renewable energy project by contracting to purchase the power generated by the system. The renewable energy equipment is installed and owned by a developer but located on-site at the agency facility.

  2. NEGOTIATED AGREEMENT BETWEEN National Energy American Federation...

    Broader source: Energy.gov (indexed) [DOE]

    ......... 8 ARTICLE 6: EMPLOYEE RIGHTS ............ 40 ARTICLE 21: EMPLOYEE ASSISTANCE PROGRAM ......

  3. User Facilities

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Facilities User Facilities A new research frontier awaits! Our door is open, and we thrive on mutually beneficial partnerships and collaborations that drive innovations and new technologies. Unique world-class user facilities foster rich research opportunities Through its technology transfer efforts, Los Alamos National Laboratory can implement user facility agreements that allow its partners and other entities to conduct research at many of its unique facilities. While our largest user

  4. INTERNATIONAL AGREEMENTS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INTERNATIONAL AGREEMENTS Signed by Secretary Spencer Abraham January 2001-December 2004 TABLE OF CONTENTS Joint Statement of ntent between the Department of Energy of the United States ofAmerica and The Ministry of Energy and Mines of the Republic ofPeru on Cooperation in the Field of Energy -Tab 1 Fifth Hemispheric Energy Ministers Meeting Mexico City, Mexico - March 9, 2001. Mexico Declaration - Energy: A Crucial Factor for Integration and Sustainable Development in the Hemisphere - Tab 2

  5. MOBILITY AGREEMENT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MOBILITY AGREEMENT I hereby acknowledge that, as a condition of my employment as a Criminal Investigator with the Department of Energy, Office of Inspector General, I may be required to relocate to an OIG office in another geographic location based on the needs of the organization. I understand that my failure to accept such a directed reassignment could be a basis for my separation from the service. _______________________________ Signature Date

  6. Sandia National Laboratories: Strategic Partnership Projects, Non-Federal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Entity (SPP/NFE) Agreements Strategic Partnership Projects, Non-Federal Entity (SPP/NFE) Agreements Alt text Potential Sponsors Funding Terms and Conditions Click here to learn more... Potential Partners Our Process Process Flow Click here to learn more... Facilities Explore Sandia Click here to explore Sandia. Projects To support its missions, many of the technologies, processes, and special technical expertise developed at Sandia have been applied to solving problems in the private sector

  7. Novation Agreements

    Office of Environmental Management (EM)

    63 Federal Register / Vol. 81, No. 5 / Friday, January 8, 2016 / Notices Rapides Parish Rapides Parish Library, 411 Washington St., Alexandria, 15001005 West Carroll Parish Oak Grove Community House, 414 James St., Oak Grove, 15001006 MASSACHUSETTS Worcester County Barnes-Hill House, 12 N. Brookfield Rd., Spencer, 15001007 MISSOURI St. Louis Independent city Gravois-Jefferson Streetcar Suburb Historic District (Boundary Increase), (South St. Louis Historic Working and Middle Class Streetcar

  8. Report on the Effect the Low Enriched Uranium Delivered Under the Highly Enriched Uranium Agreement Between the USA and the Russian Federation has on the Domestic Uranium Mining, Conversion, and Enrichment Industries and the Ops of the Gaseous Diffusion

    Broader source: Energy.gov [DOE]

    The successful implementation of the HEU Agreement remains a high priority of the U.S. Government. The agreement also serves U.S. and Russian commercial interests. HEU Agreement deliveries are an...

  9. Quick Guide: Power Purchase Agreements (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-07-01

    Introduction to Federal power purchase agreements (PPAs), including available FEMP services and technical assistance as well as questions to ask when evaluating PPAs for a Federal renewable energy project.

  10. Quick Guide: Power Purchase Agreements (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-06-01

    Introduction to Federal power purchase agreements (PPAs), including available FEMP services and technical assistance as well as questions to ask when evaluating PPAs for a Federal renewable energy project.