National Library of Energy BETA

Sample records for feasibility study cxs

  1. Renewable Energy Feasibility Study

    Broader source: Energy.gov [DOE]

    After a Federal agency has identified probable technologies through the screening process, a detailed review of the feasibility and economic viability of each renewable energy technology, also...

  2. Makah Renewable Energy Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Makah Renewable Energy Feasibility Study Makah Project Manager: Bud Denney Coordinator: ... Future Plans * Investigate supplemental sources for financing. * Seek other uses for ...

  3. Feasibility Study Report Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Feasibility Study Report Template Feasibility Study Report Template This template is used for documenting the methodology and outcome of a feasibility study. PDF icon Feasibility Study Report Template More Documents & Publications Aquisition Plan System Design Transition Plan

  4. Tribal Utility Feasibility Study

    SciTech Connect (OSTI)

    Engel, R. A.; Zoellick, J. J.

    2007-06-30

    The Schatz Energy Research Center (SERC) assisted the Yurok Tribe in investigating the feasibility of creating a permanent energy services program for the Tribe. The original purpose of the DOE grant that funded this project was to determine the feasibility of creating a full-blown Yurok Tribal electric utility to buy and sell electric power and own and maintain all electric power infrastructure on the Reservation. The original project consultant found this opportunity to be infeasible for the Tribe. When SERC took over as project consultant, we took a different approach. We explored opportunities for the Tribe to develop its own renewable energy resources for use on the Reservation and/or off-Reservation sales as a means of generating revenue for the Tribe. We also looked at ways the Tribe can provide energy services to its members and how to fund such efforts. We identified opportunities for the development of renewable energy resources and energy services on the Yurok Reservation that fall into five basic categories: • Demand-side management – This refers to efforts to reduce energy use through energy efficiency and conservation measures. • Off-grid, facility and household scale renewable energy systems – These systems can provide electricity to individual homes and Tribal facilities in areas of the Reservation that do not currently have access to the electric utility grid. • Village scale, micro-grid renewable energy systems - These are larger scale systems that can provide electricity to interconnected groups of homes and Tribal facilities in areas of the Reservation that do not have access to the conventional electric grid. This will require the development of miniature electric grids to serve these interconnected facilities. • Medium to large scale renewable energy development for sale to the grid – In areas where viable renewable energy resources exist and there is access to the conventional electric utility grid, these resources can be developed and sold to the wholesale electricity market. • Facility scale, net metered renewable energy systems – These are renewable energy systems that provide power to individual households or facilities that are connected to conventional electric utility grid.

  5. Fort Mojave Tribe - Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Feasibility Study Bill Cyr AHA MACAV POWER SERVICE Russell Gum ERCC Analytics QuickTime(tm) and a TIFF (Uncompressed) decompressor are needed to see this picture. Bottom Line * ...

  6. Ft. Mojave Renewable Energy Feasibility Study

    Energy Savers [EERE]

    Renewable Energy Feasibility Study Ft. Mojave Renewable Energy Feasibility Study Presented by Bill Cyr and Russell Gum Presented by Bill Cyr and Russell Gum Overview Document ...

  7. Manzanita Wind Energy Feasibility Study

    SciTech Connect (OSTI)

    Trisha Frank

    2004-09-30

    The Manzanita Indian Reservation is located in southeastern San Diego County, California. The Tribe has long recognized that the Reservation has an abundant wind resource that could be commercially utilized to its benefit. Manzanita has explored the wind resource potential on tribal land and developed a business plan by means of this wind energy feasibility project, which enables Manzanita to make informed decisions when considering the benefits and risks of encouraging large-scale wind power development on their lands. Technical consultant to the project has been SeaWest Consulting, LLC, an established wind power consulting company. The technical scope of the project covered the full range of feasibility assessment activities from site selection through completion of a business plan for implementation. The primary objectives of this feasibility study were to: (1) document the quality and suitability of the Manzanita Reservation as a site for installation and long-term operation of a commercially viable utility-scale wind power project; and, (2) develop a comprehensive and financeable business plan.

  8. Hooper Bay Efficiency Feasibility Study

    Office of Environmental Management (EM)

    (OUR PEOPLE) Hooper Bay Energy Efficiency Feasibility ... The name Hooper Bay came into common usage after a post ... BAY IS MARITIME. THE MEAN ANNUAL SNOWFALL IS 75 INCHES ...

  9. IPNS upgrade: A feasibility study

    SciTech Connect (OSTI)

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  10. Beluga coal gasification feasibility study

    SciTech Connect (OSTI)

    Robert Chaney; Lawrence Van Bibber

    2006-07-15

    The objective of the study was to determine the economic feasibility of developing and siting a coal-based integrated gasification combined-cycle (IGCC) plant in the Cook Inlet region of Alaska for the co-production of electric power and marketable by-products. The by-products, which may include synthesis gas, Fischer-Tropsch (F-T) liquids, fertilizers such as ammonia and urea, alcohols, hydrogen, nitrogen and carbon dioxide, would be manufactured for local use or for sale in domestic and foreign markets. This report for Phase 1 summarizes the investigation of an IGCC system for a specific industrial setting on the Cook Inlet, the Agrium U.S. Inc. ('Agrium') fertilizer plant in Nikiski, Alaska. Faced with an increase in natural gas price and a decrease in supply, the Agrium is investigating alternatives to gas as feed stock for their plant. This study considered all aspects of the installation and infrastructure, including: coal supply and cost, coal transport costs, delivery routes, feedstock production for fertilizer manufacture, plant steam and power, carbon dioxide (CO{sub 2}) uses, markets for possible additional products, and environmental permit requirements. The Cook Inlet-specific Phase 1 results, reported here, provided insight and information that led to the conclusion that the second study should be for an F-T plant sited at the Usibelli Coal Mine near Healy, Alaska. This Phase 1 case study is for a very specific IGCC system tailored to fit the chemical and energy needs of the fertilizer manufacturing plant. It demonstrates the flexibility of IGCC for a variety of fuel feedstocks depending on plant location and fuel availability, as well as the available variety of gas separation, gas cleanup, and power and steam generation technologies to fit specific site needs. 18 figs., 37 tabs., 6 apps.

  11. Quinault Indian Nation - Renewable Energy Feasibility Study

    Office of Environmental Management (EM)

    study and generate a renewable energy development plan so that the Quinault Indian Nation will be energy self- sufficient and, if feasible, export energy to the commercial market. ...

  12. Multnomah County Hydrokinetic Feasibility Study: Final Feasibility Study Report

    SciTech Connect (OSTI)

    Stephen Spain

    2012-03-15

    HDR has completed a study of the technical, regulatory, and economic feasibility of installing hydrokinetic turbines under the Morrison, Broadway, and Sellwood bridges. The primary objective of installing hydrokinetic turbines is a demonstration of in-stream hydrokinetic technologies for public education and outreach. Due to the low gradient of the Lower Willamette and the effects of the tide, velocities in the area in consideration are simply not high enough to economically support a commercial installation. While the velocities in the river may at times provide enough energy for a commercial turbine to reach capacity, the frequency and duration of high flow events which provide suitable velocities is not sufficient to support a commercial hydrokinetic installation. We have observed that over an 11 year period, daily average velocities in the Lower Willamette exceeded a nominal cut-in speed of 0.75 m/s only 20% of the time, leaving net zero power production for the remaining 80% of days. The Sellwood Bridge site was estimated to have the best hydrokinetic resource, with an estimated average annual production of about 9,000 kWh. The estimated production could range from 2,500 kWh to 15,000 kWh. Based on these energy estimates, the amount of revenue generated through either a power purchase agreement (PPA) or recovered through net metering is not sufficient to repay the project costs within the life of the turbine. The hydrokinetic resource at the Morrison and Broadway Bridges is slightly smaller than at the Sellwood Bridge. While the Broadway and Morrison Bridges have existing infrastructure that could be utilized, the project is not expected to generate enough revenue to repay the investment. Despite low velocities and energy production, the sites themselves are favorable for installation of a demonstration or experimental project. With high public interest in renewable energy, the possibility exists to develop a hydrokinetic test site which could provide developers and scientists a location to temporarily deploy and test hydrokinetic devices, and also function as an educational tool for the general public. Bridge piers provide an excellent pre-existing anchor point for hydrokinetic devices, and existing infrastructure at the Morrison and Broadway Bridges may reduce installation costs. Opportunity exists to partner with local universities with engineering and environmental interest in renewable energy. A partnership with Portland State University’s engineering school could provide students with an opportunity to learn about hydrokinetics through senior design projects. Oregon State University and University of Washington, which are partnered through the Northwest National Marine Renewable Energy Center (NNMREC) to study and test hydrokinetic technology, are also relatively local to the site. In addition to providing an opportunity for both public and private entities to learn technically about in-stream kinetics, this approach will encourage grant funding for outreach, education, and product development, while also serving as a positive community relations opportunity for the County and its partners.

  13. Iowa Tribe of Oklahoma Wind Feasibility Study

    Energy Savers [EERE]

    Oklahoma Wind Feasibility Study ORGANIZATION * Iowa Tribe of Oklahoma Federally Recognized Indian Tribe Central Oklahoma (between OKC & Tulsa) Strong Commitment to Energy Efficiency & Renewables * BKJ Solutions, Inc. Tribally Owned Construction Company Construction with USACE, IHS, BIA & Tribe Iowa Tribe of Oklahoma's traditional jurisdictional lands FEASIBILITY GRANT * Objectives Conduct in-Depth Feasibility Study of Wind Energy Identify & Address Technical

  14. WERF MACT Feasibility Study Report

    SciTech Connect (OSTI)

    B. Bonnema; D. Moser; J. Riedesel; K. Kooda; K. Liekhus; K. Rebish; S. Poling

    1998-11-01

    This study was undertaken to determine the technical feasibility of upgrading the Waste Experimental Reduction Facility (WERF) at the Idaho National Engineering and Environmental Laboratory to meet the offgas emission limits proposed in the Maximum Achievable Control Technologies (MACT)rule. Four practicable offgas treatment processes were identified, which, if installed, would enable the WERF to meet the anticipated MACT emission limits for dioxins and furans (D/F), hydrochloric acid (HCI), and mercury (Hg). Due to the three-year time restraint for MACT compliance, any technology chosen for the upgrade must be performed within the general plant project funding limit of $5 M. The option selected consists of a partial-quench evaporative cooler with dry sorbent injection for HCI removal followed by a sulfur-impregnated activated carbon bed for Hg control. The planning cost estimate for implementing the option is $4.17 M (with 24% contingency). The total estimated cost includes capital costs, design and construction costs, and project management costs. Capital costs include the purchase of a new offgas evaporative cooler, a dry sorbent injection system with reagent storage, a new fabric filter baghouse, a fixed carbon bed absorber, and two offgas induced draft exhaust fans. It is estimated that 21 months will be required to complete the recommended modification to the WERF. The partial-quench cooler is designed to rapidly cool the offgas exiting the secondary combustion chamber to minimize D/F formation. Dry sorbent injection of an alkali reagent into the offgas is recommended. The alkali reacts with the HCI to form a salt, which is captured with the fly ash in the baghouse. A design HCI removal efficiency of 97.2% allows for the feeding 20 lbs/hr of chlorine to the WERF incinerator. The sorbent feed rate can be adjusted to achieve the desired HCI removal efficiency. A fixed bed of sulfur-impregnated carbon was conservatively sized for a total Hg removal capacity when feeding 10 g/hr Hg to the WERF incinerator. An added benefit for using carbon adsorption is that the activated carbon will also capture a large fraction of any residual D/F present in the offgas.

  15. Muon Muon Collider: Feasibility Study

    SciTech Connect (OSTI)

    Gallardo, J.C.; Palmer, R.B.; Tollestrup, A.V.; Sessler, A.M.; Skrinsky, A.N.; Ankenbrandt, C.; Geer, S.; Griffin, J.; Johnstone, C.; Lebrun, P.; McInturff, A.; Mills, Frederick E.; Mokhov, N.; Moretti, A.; Neuffer, D.; Ng, K.Y.; Noble, R.; Novitski, I.; Popovic, M.; Qian, C.; Van Ginneken, A. ,

    2012-04-05

    A feasibility study is presented of a 2 + 2 TeV muon collider with a luminosity of L = 10{sup 35} cm{sup -2}s{sup -1}. The resulting design is not optimized for performance, and certainly not for cost; however, it does suffice - we believe - to allow us to make a credible case, that a muon collider is a serious possibility for particle physics and, therefore, worthy of R and D support so that the reality of, and interest in, a muon collider can be better assayed. The goal of this support would be to completely assess the physics potential and to evaluate the cost and development of the necessary technology. The muon collider complex consists of components which first produce copious pions, then capture the pions and the resulting muons from their decay; this is followed by an ionization cooling channel to reduce the longitudinal and transverse emittance of the muon beam. The next stage is to accelerate the muons and, finally, inject them into a collider ring wich has a small beta function at the colliding point. This is the first attempt at a point design and it will require further study and optimization. Experimental work will be needed to verify the validity of diverse crucial elements in the design. Muons because of their large mass compared to an electron, do not produce significant synchrotron radiation. As a result there is negligible beamstrahlung and high energy collisions are not limited by this phenomena. In addition, muons can be accelerated in circular devices which will be considerably smaller than two full-energy linacs as required in an e{sup +} - e{sup -} collider. A hadron collider would require a CM energy 5 to 10 times higher than 4 TeV to have an equivalent energy reach. Since the accelerator size is limited by the strength of bending magnets, the hadron collider for the same physics reach would have to be much larger than the muon collider. In addition, muon collisions should be cleaner than hadron collisions. There are many detailed particle reactions which are open to a muon collider and the physics of such reactions - what one learns and the necessary luminosity to see interesting events - are described in detail. Most of the physics accesible to an e{sup +} - e{sup -} collider could be studied in a muon collider. In addition the production of Higgs bosons in the s-channel will allow the measurement of Higgs masses and total widths to high precision; likewise, t{bar t} and W{sup +}W{sup -} threshold studies would yield m{sub t} and m{sub w} to great accuracy. These reactions are at low center of mass energy (if the MSSM is correct) and the luminosity and {Delta}p/p of the beams required for these measurements is detailed in the Physics Chapter. On the other hand, at 2 + 2 TeV, a luminosity of L {approx} 10{sup 35} cm{sup -2}s{sup -1} is desirable for studies such as, the scattering of longitudinal W bosons or the production of heavy scalar particles. Not explored in this work, but worth noting, are the opportunities for muon-proton and muon-heavy ion collisions as well as the enormous richness of such a facility for fixed target physics provided by the intense beams of neutrinos, muons, pions, kaons, antiprotons and spallation neutrons. To see all the interesting physics described herein requires a careful study of the operation of a detector in the very large background. Three sources of background have been identified. The first is from any halo accompanying the muon beams in the collider ring. Very carefully prepared beams will have to be injected and maintained. The second is due to the fact that on average 35% of the muon energy appears in its decay electron. The energy of the electron subsequently is converted into EM showers either from the synchrotron radiation they emit in the collider magnetic field or from direct collision with the surrounding material. The decays that occur as the beams traverse the low beta insert are of particular concern for detector backgrounds. A third source of background is e{sup +} - e{sup -} pair creation from {mu}{sup +} - {mu}{sup -} interaction. Studies of how to shield the detector and reduce the background are addressed in the Detector Chapter. Polarization of the muons allows many very interesting measurements which are discussed in the Physics Chapter. Unlike the electron collider in which the electron beam is highly polarized and the positron beam unpolarized, both muon beams may be partially polarized. It is necessary to select forward moving muons from the pion's decay and thus reduce the available number of muons and hence the luminosity. The necessary machine technology needed to achieve such a collider is discussed in the Option Chapter; at the moment it is not part of our point design, although such capability would almost certainly be incorporated into an actual device.

  16. Taos Pueblo Renewable Energy Feasibility Study

    Energy Savers [EERE]

    Taos Pueblo Renewable Energy Renewable Energy Feasibility Study Feasibility Study Taos, New Mexico Taos, New Mexico 2004 2004 - - 2006 2006 Scope of Study Scope of Study Solar Solar Wind Wind Biomass Biomass Hydro Hydro Tribal Council review Tribal Council review Business plan development Business plan development Solar Solar New Mexico New Mexico sunshine sunshine abundant abundant even in even in winter winter Solar Solar Demonstration Projects: Demonstration Projects: rock rock - - storage

  17. Quinault Indian Nation - Renewable Energy Feasibility Study

    Energy Savers [EERE]

    Beginnings * 1990's: Original biomass study * 2002: QIN Renewable Energy Team formed * 2004: DOE feasibility study starts (two-year) * 2006: DOE Final Report * 2006: USDA commercial study begins QIN Goals * Energy self-sufficiency * Create an energy system consistent with: - Opportunity - Environmental sustainability - Cultural values * Generate employment and business opportunities Deliverables * Conduct a feasibility study * Generate a renewable energy development plan The Quinault Indian

  18. Cherokee Nation - Wind Energy Feasibility Study

    Energy Savers [EERE]

    8, 2005 Oklahoma - 8 th in the Nation for wind 13 Month Wind Energy Feasibility Study - U.S. Dept of Energy grant Cherokee Nation, 2nd largest Indian Tribe - 256,938 members ...

  19. Conceptual Thermal Treatment Technologies Feasibility Study

    SciTech Connect (OSTI)

    Suer, A.

    1996-02-28

    This report presents a conceptual Thermal Treatment Technologies Feasibility Study (FS) for the Savannah River Site (SRS) focusing exclusively on thermal treatment technologies for contaminated soil, sediment, or sludge remediation projects.

  20. Three Affliated Tribes Renewable Energy Feasibility Study

    SciTech Connect (OSTI)

    Belvin Pete; Kent Good; Krista Gordon; Ed McCarthy,

    2006-05-26

    The Three Affliated Tribes on the Fort Berthold Reservation studied the feasibility of a commercial wind facility on land selected and owned by the Tribes and examined the potential for the development of renewable energy resources on Tribal Lands.

  1. White Earth Biomass/Biogas Feasibility Study

    SciTech Connect (OSTI)

    Triplett, Michael

    2015-03-12

    The White Earth Nation examined the feasibility of cost savings and fossil energy reduction through the installation of biogas/biomass boiler at the tribal casino. The study rejected biogas options due to availability and site constraints, but found a favorable environment for technical and financial feasibility of installing a 5 MMBtu hot water boiler system to offset 60-70 percent of current fuel oil and propane usage.

  2. Feasibility Study of Economics and Performance of Geothermal...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Feasibility Study of Economics and Performance of Geothermal Power Generation at the ... * www.nrel.gov Feasibility Study of Economics and Performance of Geothermal Power ...

  3. Cherokee Nation Enterprises Wind Energy Feasibility Study Grant...

    Broader source: Energy.gov (indexed) [DOE]

    ENERGY WIND ENERGY FEASIBILITY STUDY FEASIBILITY STUDY Grant Report Grant Report October 19, 2004 October 19, 2004 Cherokee Nation Enterprises Cherokee Nation Enterprises Cherokee ...

  4. Renewable Energy Feasibility Study Final Report

    SciTech Connect (OSTI)

    Rooney, Tim

    2013-10-30

    The Gila River Indian Community (GRIC or the Community) contracted the ANTARES Group, Inc. (“ANTARES”) to assess the feasibility of solar photovoltaic (PV) installations. A solar energy project could provide a number of benefits to the Community in terms of potential future energy savings, increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a solar project’s overall feasibility, including:  Technical appropriateness;  Solar resource characteristics and expected system performance;  Levelized cost of electricity (LCOE) economic assessment. The Gila River Indian Community (GRIC or the Community) contracted the ANTARES Group, Inc. (“ANTARES”) to prepare a biomass resource assessment study and evaluate the feasibility of a bioenergy project on Community land. A biomass project could provide a number of benefits to the Community in terms of increased employment, environmental benefits from renewable energy generation and usage, and increased energy self-sufficiency. The study addresses a number of facets of a biomass project’s overall feasibility, including:  Resource analysis and costs;  Identification of potential bioenergy projects;  Technical and economic (levelized cost of energy) modeling for selected project configuration.

  5. White Earth Nation Biomass Feasibility Study

    Energy Savers [EERE]

    May 5, 2015 - DOE Tribal Energy Program Mike Triplett, Planner White Earth Nation Presentation Overview * Study Objectives * Accomplishments to Date * Initial Findings * Observations * Plans Forward 2 Study Objectives * Primary Objectives: * Conduct a due diligence grade feasibility study to assess the opportunity to convert existing thermal and power systems at the Shooting Star Casino to a sustainable bioenergy system. * Background * The Casino is utilizing fuel oil and propane fired boilers

  6. White Earth Nation Biomass Feasibility Study

    Energy Savers [EERE]

    March 27, 2014 Mike Triplett, Planner White Earth Nation Presentation Overview * Study Objectives * Accomplishments to Date * Initial Findings * Observations * Plans Forward 2 Study Objectives * Primary Objectives: * Conduct a due diligence grade feasibility study to assess the opportunity to convert existing thermal and power systems at the Shooting Star Casino to a sustainable bioenergy system. * Background * The Casino is utilizing fuel oil and propane fired boilers as primary source of

  7. Sealaska Corporation Renewable Energy Feasibility Study

    Energy Savers [EERE]

    Sealaska Corporation RENEWABLE ENERGY FEASIBILITY STUDY Sealaska Project Manager: Russell Dick Technical Contact: Bob Lynette October 2004 An Alaska Native Corporation * One of 13 Alaska Native regional corporations created under the Alaska Native Claims Settlement Act * Represent over 17,000 shareholders, approximately half of whom reside in SE Alaska * Regional corporation for SE Alaska, which includes 12 village/urban corporations Study Area - Southeast Alaska 12 Alaska Native Villages

  8. Taos Pueblo Renewable Energy Feasibility Study

    Energy Savers [EERE]

    Renewable Energy Feasibility Study Taos, New Mexico 2004-2005 Funded by DOE Tribal Energy Program Scope of Study * Solar * Wind * Biomass * Hydro * Concept development based on resources * Tribal Council review * Business plan development Solar * New Mexico sunshine abundant even in winter * Demonstration Projects: greenhouse rock- storage system, p.v.-powered well pump * New housing will utilize passive-solar and solar- thermal hot water. Greenhouse heating and cooling system Installation of 1

  9. Yurok Tribe - Tribal Utility Feasibility Study

    Energy Savers [EERE]

    9/05 Yurok Tribe Tribal Utility Feasibility Study & Human Capacity Building in Energy Efficiency and Renewable Energy System Maintenance Presented By: Dustin Jolley, Tribal Engineer 10/19/05 Location 10/19/05 Background * Traditional livelihood on the Yurok Reservation is based upon subsistence harvest of salmon on the Klamath River. * Historically 70% of residents on the Yurok Reservation have not had convenient access to power or phone. * The Yurok Reservation straddles two counties and is

  10. Aleutian Pribilof Islands Wind Energy Feasibility Study

    Energy Savers [EERE]

    1- Award Number: DE-FG36-05GO15183 Recipient Organization: Aleutian Pribilof Islands Association Project Title: Aleutian Pribilof Islands Wind Energy Feasibility Study Project Director: Bruce Wright, brucew@apiai.org Team Members: Tanadgusix Corporation (TDX), Connie Fredenberg Distribution Limitations: None TABLE OF CONTENTS Title Page Page 1 Table of Contents Page 1 Executive Summary Page 2 Background Page 3 Project Objectives Page 3 Project Activities Page 3 Site Selection and Resource

  11. Pueblo of Laguna - Renewable Energy Feasibility Study

    Energy Savers [EERE]

    Energy Feasibility Study Oct 19, 2005 Ken Garcia, POLUA Caroline Stewart, RMEP Pueblo of Laguna Utility Authority Department of Energy Tribal Energy Program Review * Background: Demographics, UA Formation * Project Overview * Project Objectives * Project Tasks * Project Contacts Discussion Outline * Federally recognized Indian Tribe * 533,000 acres straddling I-40, approximately 44 miles west of Albuquerque spanning four Counties * The Pueblo inhabitants have occupied this land since the early

  12. Fort Mojave Tribe - Renewable Energy Feasibility Study

    Energy Savers [EERE]

    Ft Mojave Renewable Energy Feasibility Russell Gum ERCC Analytics LLC russgum@mac.com The Bottom Line 8 cent or less per kWh This number has grown a bit since the beginning of the study due to Oil prices Renewable Energy legislation Increased concern about sustainability of energy supplies Short List Biodigester Wind Energy Crop Waste Concentrated Solar Very Short List Concentrated Solar Concentrated PV Ready for Prime Time? October 29, 2007 PRISM SOLAR TECHNOLOGIES, INC. WINS "MOST

  13. Washoe Tribe - Alternative Energy Feasibility Study

    Energy Savers [EERE]

    Alternative Energy Feasibility Study Washoe Tribe Parcels and Acreages Parcel Name Acres Allotment #231 160 Babbit Peak 480 Carson Community 160 Dresslerville Community/Washoe Ranch 793.32 Frank Parcel 12.23 Heidtman Purchase 80 Incline Village 2.445 Ladies Canyon 145.45 Lower Clear Creek Parcel 229 Mica 0.91 Olympic Valley 2.79 Silverado 160 Skunk Harbor 24 Stewart Community 292 Stewart Ranch 2,098 Uhalde 38.948 Upper Clear Creek Parcel 157.14 Wade Parcels (Upper and Lower) 320 Woodfords

  14. EIS-0191: Feasibility Study for Tonawanda Site

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Oak Ridge Operations Office conducted a remedial investigation/feasibility study/proposed plan-environmental impact statement process for a Formerly Utilized Sites Remedial Action Program to be carried out at the Tonawanda site in Tonawanda, New York, in accordance with procedures developed under the Comprehensive Environmental Response, Compensation, and Liability Act and National Environmental Policy Act. This DOE environmental impact statement was cancelled in 1997 because the program was transferred from DOE to the U.S. Army Corps of Engineers.

  15. Hoopa Valley Tribe - Small Hydropower Feasibility Study

    Energy Savers [EERE]

    Micro-Hydro Feasibility Study Hoopa Valley Tribe Curtis Miller The Hoopa Valley Reservation was established in 1868 by executive order of Ulysses S. Grant and contains the aboriginal homeland of the Hupa People. It encompasses approximately 100,000 acres and is 96% owned by the Hoopa Tribe. Salmon are the life blood of the Hupa and Yurok and Karuk people There are over 1200 miles of major streams within the Hoopa Valley Reservation many of which support Salmon and Rainbow trout. 50-60 inches of

  16. Battery energy storage market feasibility study

    SciTech Connect (OSTI)

    Kraft, S.; Akhil, A.

    1997-07-01

    Under the sponsorship of the Department of Energy`s Office of Utility Technologies, the Energy Storage Systems Analysis and Development Department at Sandia National Laboratories (SNL) contracted Frost and Sullivan to conduct a market feasibility study of energy storage systems. The study was designed specifically to quantify the energy storage market for utility applications. This study was based on the SNL Opportunities Analysis performed earlier. Many of the groups surveyed, which included electricity providers, battery energy storage vendors, regulators, consultants, and technology advocates, viewed energy storage as an important enabling technology to enable increased use of renewable energy and as a means to solve power quality and asset utilization issues. There are two versions of the document available, an expanded version (approximately 200 pages, SAND97-1275/2) and a short version (approximately 25 pages, SAND97-1275/1).

  17. FERC Order No. 2003 Appendix 2 - Feasibility Study Agreement...

    Open Energy Info (EERE)

    2 - Feasibility Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 2 - Feasibility Study Agreement Abstract FERC...

  18. Aleutian Pribilof Islands Wind Energy Feasibility Study

    SciTech Connect (OSTI)

    Bruce A. Wright

    2012-03-27

    Under this project, the Aleutian Pribilof Islands Association (APIA) conducted wind feasibility studies for Adak, False Pass, Nikolski, Sand Point and St. George. The DOE funds were also be used to continue APIA's role as project coordinator, to expand the communication network quality between all participants and with other wind interest groups in the state and to provide continued education and training opportunities for regional participants. This DOE project began 09/01/2005. We completed the economic and technical feasibility studies for Adak. These were funded by the Alaska Energy Authority. Both wind and hydro appear to be viable renewable energy options for Adak. In False Pass the wind resource is generally good but the site has high turbulence. This would require special care with turbine selection and operations. False Pass may be more suitable for a tidal project. APIA is funded to complete a False Pass tidal feasibility study in 2012. Nikolski has superb potential for wind power development with Class 7 wind power density, moderate wind shear, bi-directional winds and low turbulence. APIA secured nearly $1M from the United States Department of Agriculture Rural Utilities Service Assistance to Rural Communities with Extremely High Energy Costs to install a 65kW wind turbine. The measured average power density and wind speed at Sand Point measured at 20m (66ft), are 424 W/m2 and 6.7 m/s (14.9 mph) respectively. Two 500kW Vestas turbines were installed and when fully integrated in 2012 are expected to provide a cost effective and clean source of electricity, reduce overall diesel fuel consumption estimated at 130,000 gallons/year and decrease air emissions associated with the consumption of diesel fuel. St. George Island has a Class 7 wind resource, which is superior for wind power development. The current strategy, led by Alaska Energy Authority, is to upgrade the St. George electrical distribution system and power plant. Avian studies in Nikolski and Sand Point have allowed for proper wind turbine siting without killing birds, especially endangered species and bald eagles. APIA continues coordinating and looking for funding opportunities for regional renewable energy projects. An important goal for APIA has been, and will continue to be, to involve community members with renewable energy projects and energy conservation efforts.

  19. Lunar Wireless Power Transfer Feasibility Study

    SciTech Connect (OSTI)

    Sheldon Freid, et al.

    2008-06-01

    This study examines the feasibility of a multi-kilowatt wireless radio frequency (RF) power system to transfer power between lunar base facilities. Initial analyses, show that wireless power transfer (WPT) systems can be more efficient and less expensive than traditional wired approaches for certain lunar and terrestrial applications. The study includes evaluations of the fundamental limitations of lunar WPT systems, the interrelationships of possible operational parameters, and a baseline design approach for a notionial system that could be used in the near future to power remote facilities at a lunar base. Our notional system includes state-of-the-art photovoltaics (PVs), high-efficiency microwave transmitters, low-mass large-aperture high-power transmit antennas, high-efficiency large-area rectenna receiving arrays, and reconfigurable DC combining circuitry.

  20. Feasibility Study for Paragon - Bisti Solar Ranch

    SciTech Connect (OSTI)

    Benally, Thomas

    2015-06-01

    The Navajo Hopi Land Commission Office (NHLCO) and Navajo Nation (NN) plan to develop renewable energy (RE) projects on the Paragon-Bisti Ranch (PBR) lands, set aside under the Navajo Hopi Land Settlement Act (NHLSA) for the benefit of Relocatees. This feasibility study (FS), which was funded under a grant from DOE’s Tribal Energy Program (TEP), was prepared in order to explore the development of the 22,000-acre PBR in northwestern New Mexico for solar energy facilities. Topics covered include: • Site Selection • Analysis of RE, and a Preliminary Design • Transmission, Interconnection Concerns and Export Markets • Financial and Economic Analysis • Environmental Study • Socioeconomic and Cultural Factors • Next Steps.

  1. Feasibility Study of Sustainable Distributed Generation Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Introduction to Duck Valley * High Desert * Very Remote * Primary Industries - Ranching - Fishing and Hunting - Agriculture - Tribal Government - Indian Health Services Feasibility ...

  2. Cherokee Nation - Wind Power Generation Feasibility Study

    Office of Environmental Management (EM)

    Presented by: Carol Wyatt, CNE 24 October 2006 - Tribal Energy Program Denver, Colorado Cherokee Wind Project Synopsis Cherokee Wind Project Synopsis Financially Feasible Wind ...

  3. Exoskeleton for Soldier Enhancement Systems Feasibility Study

    SciTech Connect (OSTI)

    Jansen, J.F.

    2000-09-28

    The development of a successful exoskeleton for human performance augmentation (EHPA) will require a multi-disciplinary systems approach based upon sound biomechanics, power generation and actuation systems, controls technology, and operator interfaces. The ability to integrate key components into a system that enhances performance without impeding operator mobility is essential. The purpose of this study and report are to address the issue of feasibility of building a fieldable EHPA. Previous efforts, while demonstrating progress and enhancing knowledge, have not approached the level required for a fully functional, fieldable system. It is doubtless that the technologies required for a successful exoskeleton have advanced, and some of them significantly. The question to be addressed in this report is have they advanced to the point of making a system feasible in the next three to five years? In this study, the key technologies required to successfully build an exoskeleton have been examined. The primary focus has been on the key technologies of power sources, actuators, and controls. Power sources, including internal combustion engines, fuel cells, batteries, super capacitors, and hybrid sources have been investigated and compared with respect to the exoskeleton application. Both conventional and non-conventional actuator technologies that could impact EHPA have been assessed. In addition to the current state of the art of actuators, the potential for near-term improvements using non-conventional actuators has also been addressed. Controls strategies, and their implication to the design approach, and the exoskeleton to soldier interface have also been investigated. In addition to these key subsystems and technologies, this report addresses technical concepts and issues relating to an integrated design. A recommended approach, based on the results of the study is also presented.

  4. Bin Set 1 Calcine Retrieval Feasibility Study

    SciTech Connect (OSTI)

    R. D. Adams; S. M. Berry; K. J. Galloway; T. A. Langenwalter; D. A. Lopez; C. M. Noakes; H. K. Peterson; M. I. Pope; R. J. Turk

    1999-10-01

    At the Department of Energy's Idaho Nuclear Technology and Engineering Center, as an interim waste management measure, both mixed high-level liquid waste and sodium bearing waste have been solidified by a calculation process and are stored in the Calcine Solids Storage Facilities. This calcined product will eventually be treated to allow final disposal in a national geologic repository. The Calcine Solids Storage Facilities comprise seven ''bit sets.'' Bin Set 1, the first to be constructed, was completed in 1959, and has been in service since 1963. It is the only bin set that does not meet current safe-shutdown earthquake seismic criteria. In addition, it is the only bin set that lacks built-in features to aid in calcine retrieval. One option to alleviate the seismic compliance issue is to transport the calcine from Bin Set 1 to another bin set which has the required capacity and which is seismically qualified. This report studies the feasibility of retrieving the calcine from Bi n Set 1 and transporting it into Bin Set 6 which is located approximately 650 feet away. Because Bin Set 1 was not designed for calcine retrieval, and because of the high radiation levels and potential contamination spread from the calcined material, this is a challenging engineering task. This report presents preconceptual design studies for remotely-operated, low-density, pneumatic vacuum retrieval and transport systems and equipment that are based on past work performed by the Raytheon Engineers and Constructors architectural engineering firm. The designs presented are considered feasible; however, future development work will be needed in several areas during the subsequent conceptual design phase.

  5. Final DOE Areas Feasibility Study, Appendices A - F

    Office of Legacy Management (LM)

    DOE Areas Feasibility Study Appendices LEHR CERCLA Completion Rev. 0 03/07/08 J:\DOE_STOLLER\4110\143\FEASIBILITY_STUDY\20080307_FS_TEXT_REV0.DOC WEISS ASSOCIATES Project Number: 130-4110-143 APPENDIX A COST ESTIMATES Final DOE Areas Feasibility Study Appendix A LEHR CERCLA Completion Rev. 0 03/07/08 Tables J:\DOE_Stoller\4110\143\Feasibility_Study\Rev0\Appendices\20080307_FS_APPA_tbls.doc Weiss Associates Project Number: 130-4110-143 Table A-1. Feasibility Study Cost Estimate Summaries Area/

  6. Pascua Yaqui Tribe DOE Solar Energy Feasibility and Deployment Study

    Energy Savers [EERE]

    Pascua Yaqui Tribe DOE Solar Energy Feasibility and Deployment Study Pascua Yaqui Tribe/DOE Solar Feasibility & Deployment Pascua Yaqui Tribe  The reservation is located in Tucson, Arizona  Reservation population approximately 4,000  Total tribal enrollment 18,000 Pascua Yaqui Tribe/DOE Solar Feasibility & Deployment History Pascua Yaqui Tribe/DOE Solar Feasibility & Deployment  In 1978, the Pascua Yaqui Tribe of Arizona became federally recognized and in 1994 the

  7. BIOMASS-TO-ENERGY FEASIBILITY STUDY

    SciTech Connect (OSTI)

    Cecil T. Massie

    2002-09-03

    The purpose of this study was to assess the economic and technical feasibility of producing electricity and thermal energy from biomass by gasification. For an economic model we chose a large barley malting facility operated by Rahr Malting Co. in Shakopee, Minnesota. This plant provides an excellent backdrop for this study because it has both large electrical loads and thermal loads that allowed us to consider a wide range of sizes and technical options. In the end, eleven scenarios were considered ranging from 3.1 megawatts (MWe) to 19.8 MWe. By locating the gasification and generation at an agricultural product processing plant with large electrical and thermal loads, the expectation was that some of the limitations of stand-alone biomass power plants would be overcome. In addition, since the process itself created significant volumes of low value biomass, the hope was that most of the biomass gathering and transport issues would be handled as well. The development of low-BTU gas turbines is expected to fill a niche between the upper limit of multiple spark ignited engine set systems around 5 MWe and the minimum reasonable scale for steam turbine systems around 10 MWe.

  8. Energy Efficiency in Separate Tenant Spaces - A Feasibility Study |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Efficiency in Separate Tenant Spaces - A Feasibility Study Energy Efficiency in Separate Tenant Spaces - A Feasibility Study While commercial building owners generally have control over building systems and operations, tenants play a critical role in achieving lasting reductions in energy intensity. In recognition of this collaborative role, the Department of Energy has studied the feasibility of improving energy efficiency in tenant spaces. This study finds significant

  9. Recommendation 170: Remedial Investigation/Feasibility Study for East

    Office of Environmental Management (EM)

    Tennessee Technology Park | Department of Energy 0: Remedial Investigation/Feasibility Study for East Tennessee Technology Park Recommendation 170: Remedial Investigation/Feasibility Study for East Tennessee Technology Park The ORSSAB Recommendation to DOE on a Remedial Investigation/Feasibility Study for East Tennessee Technology Park. PDF icon Recommendation 170 PDF icon DOE response to recommendation 170 More Documents & Publications Recommendation 165: Recommendation on Conducting

  10. QIN Renewable Energy Feasibility Study - Catching the Power of...

    Energy Savers [EERE]

    QIN Renewable Energy Feasibility Study Catching the Power of Energy 1112004 2 1112004 3 1112004 4 Presented by... Natalie Charley, Project Coordinator, Quinault Nation Don ...

  11. Feasibility and Design Studies for a High Temperature Downhole Tool

    Broader source: Energy.gov [DOE]

    Project objective: Perform feasibility and design studies for a high temperature downhole tool; which uses nuclear techniques for characterization purposes; using measurements and modeling/simulation.

  12. B Plant process piping replacement feasibility study

    SciTech Connect (OSTI)

    Howden, G.F.

    1996-02-07

    Reports on the feasibility of replacing existing embedded process piping with new more corrosion resistant piping between cells and between cells and a hot pipe trench of a Hanford Site style canyon facility. Provides concepts for replacement piping installation, and use of robotics to replace the use of the canyon crane as the primary means of performing/supporting facility modifications (eg, cell lining, pipe replacement, equipment reinstallation) and operational maintenenace.

  13. Feasibility Study & Design of Brightfield Solar Farm

    SciTech Connect (OSTI)

    Law, Susan

    2014-09-28

    This Congressionally Directed Project originally provided funds to the Township of Lower Providence, Pennsylvania for the purpose of investigating the potential for a renewable energy generation facility to make beneficial reuse of a closed landfill located within the Township, known as Moyer Landfill. Early in the course of the project, it was determined through collaboration and discussion with DOE to alter the scope of the project to include a feasibility assessment of a landfill solar project, as well as to construct a demonstration solar project at the municipal facilities to provide an educational and community outreach opportunity for the Township to offer regarding solar photovoltaic (“PV”) electricity generation.

  14. Feasibility study of a 200 ampere battery

    SciTech Connect (OSTI)

    Baldwin, A.R.

    1991-06-01

    The results of a Sandia National Laboratories program to design and develop a high-current thermal battery for the Hypersonic Weapons Technology Program are presented. The feasibility of a 200 A, 150 s, 12 Vdc primary battery was demonstrated under ambient conditions. New header feedthrough design concepts were used, and new internal current collectors and internal power leads were considered. The Li(Si)/LiBr-LiCl-LiF/FeS{sub 2} electrochemical system has shown exceptional performance at the high-current operation conditions. A high-rate Zinc/Silver Oxide secondary cell was also evaluated, and the results are presented in this report. These cells exhibited excellent high-rate discharge performance. 5 refs., 19 figs., 8 tabs.

  15. Co-combustion feasibility study. Final report

    SciTech Connect (OSTI)

    Handcock, D.J.

    1995-01-01

    This report investigates the technical and economic feasibility of co-combusting municipal sewage sludge produced by the Saratoga County Sewer District No. 1 with paper mill sludge produced by the Cottrell Paper Company, Encore Paper Company, International Paper Company, Mohawk Paper Mills, and TAGSONS Papers at the Saratoga County Sewer District No. 1`s secondary wastewater treatment plant and recovering any available energy products. The co-combustion facility would consist of sludge and wood chip storage and conveying systems, belt filter presses, screw presses, fluidized-bed incinerators, venturi scrubbers and tray cooling systems, ash dewatering facilities, heat recovery steam generators, gas-fired steam superheaters, and a back-pressure steam turbine system. Clean waste wood chips would be used as an auxiliary fuel in the fluidized-bed incinerators. It is recommended that the ash produced by the proposed facility be beneficially used, potentially as a raw material in the manufacture of cement and/or as an interim barrier layer in landfills.

  16. Washoe Tribe Alternative Energy Feasibility Study Final Report

    SciTech Connect (OSTI)

    Johnson, Jennifer

    2014-10-01

    The Washoe Tribe of Nevada and California was awarded funding to complete the Washoe Tribe Alternative Energy Feasibility Study project. The main goal of the project was to complete an alternative energy feasibility study. This study was completed to evaluate “the potential for development of a variety of renewable energy projects and to conduct an alternative energy feasibility study that determines which alternative energy resources have the greatest economic opportunity for the Tribe, while respecting cultural and environmental values” (Baker-Tilly, 2014). The study concluded that distributed generation solar projects are the best option for renewable energy development and asset ownership for the Washoe Tribe. Concentrating solar projects, utility scale wind projects, geothermal, and biomass resource projects were also evaluated during the study and it was determined that these alternatives would not be feasible at this time.

  17. Final Report: Feasibility Study of Biomass in Snohomish County, Washington

    SciTech Connect (OSTI)

    Daryl Williams; Ray Clark

    2005-01-31

    This report and its attachments summarizes the results of a unique tribal-farmer cooperative study to evaluate the feasibility of building one or more regional anaerobic digestion systems in Snohomish County, Washington.

  18. ARM - Field Campaign - IR Cloud Camera Feasibility Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    govCampaignsIR Cloud Camera Feasibility Study ARM Data Discovery Browse Data Comments? We would love to hear from you Send us a note below or call us at 1-888-ARM-DATA. Send...

  19. 300 Area Remedial Investigation/Feasibility Study and Proposed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    S. Hudson Page 1 of 2 300 Area Remedial InvestigationFeasibility Study and Proposed Plan Deconstruct Advice Points (paragraph number ) 4-1 The Board believes the Tri-Party...

  20. DRAFT HAB Advice: Remedial Investigation/Feasibility Study and...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HAB Advice: Remedial InvestigationFeasibility Study and Proposed Plan for the 100-FR-1, 100-FR-2, 100-FR-3, 100-IU-2 and 100-IU-6 Operable Units; DOERL Authors; Shelley Cimon,...

  1. Pueblo of Zia Renewable Energy Development Feasibility Study

    Energy Savers [EERE]

    Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA 2013 PROGRAM REVIEW Pueblo of Zia Renewable Energy Development Feasibility Study U.S. ...

  2. Pueblo of Zia - Renewable Energy Development Feasibility Study

    Energy Savers [EERE]

    2012 PROGRAM REVIEW Pueblo of Zia Renewable Energy Development Feasibility Study U.S. Department of Energy - Award No: DE-EE0005628 November 15, 2012 Operated by Los Alamos ...

  3. DOE Seeks Industry Proposals for Feasibility Study to Produce...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Existing Nuclear Power Plants DOE Seeks Industry Proposals for Feasibility Study to Produce Greenhouse Gas-Free Hydrogen at Existing Nuclear Power Plants April 13, 2006 - 10:19am ...

  4. Final Report: Energy Efficiency and Feasibility Study and Resulting...

    Energy Savers [EERE]

    Report Energy Efficiency Feasibility Study and Resulting Plan for the Bay Mills Indian Community U.S. Department of Energy Tribal Energy Program Award DE-EE0005173 Project ...

  5. USDA Offers Renewable Energy Feasibility Studies for Rural Businesses

    Broader source: Energy.gov [DOE]

    The U.S. Department of Agriculture (USDA) announced on September 7 the availability of grants of up to $50,000 for agricultural producers and rural small businesses to conduct feasibility studies for installing renewable energy systems.

  6. AK-CHIN INDIAN COMMUNITY BIOMASS FEASIBILITY STUDY

    Energy Savers [EERE]

    4 Program Review Meeting Feasibility Study for Renewable Energy Development on Community Lands Solicitation # DE-PS36-02GO92006 October 20, 2004 © 2004 L. S. Gold & Associates, Inc. Page 2 October 20, 2004 AK-CHIN INDIAN COMMUNITY BIOMASS FEASIBILITY STUDY Topics * Ak-Chin Indian Community * Project Background and Objectives * Project Description and Diagram * Project Team * Proposed Project Schedule * Items To Be Reviewed * Resource Assessment * Digester Technology * Decision Factors *

  7. Gila River Indian Community Renewable Energy Feasibility Study

    Energy Savers [EERE]

    antaresgroupinc.com Gila River Indian Community Renewable Energy Feasibility Study Presented by: ANTARES Group Inc. Tim Rooney Anneliese Schmidt Gila River Indian Community DEQ Rudy Mix March 25, 2014 ANTARES Group Incorporated www.antaresgroupinc.com Presentation Outline * Summary of Gila River Indian Community * Project overview * Summary of feasibility study assessment - Solar projects - Biomass resource assessment - Biomass projects * Project status and future plans 2 www.antaresgroupinc.com

  8. DOE Seeks Industry Proposals for Feasibility Study to Produce Greenhouse

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gas-Free Hydrogen at Existing Nuclear Power Plants | Department of Energy Proposals for Feasibility Study to Produce Greenhouse Gas-Free Hydrogen at Existing Nuclear Power Plants DOE Seeks Industry Proposals for Feasibility Study to Produce Greenhouse Gas-Free Hydrogen at Existing Nuclear Power Plants April 13, 2006 - 10:19am Addthis WASHINGTON, DC - In support of President Bush's Advanced Energy Initiative (AEI), Secretary of Energy Samuel W. Bodman today announced that the U.S. Department

  9. Pinoleville Pomo Nation Renewable Energy Feasibility Study Status Report

    Energy Savers [EERE]

    Pinoleville Pomo Nation Renewable Energy Feasibility Study Lenora Steele Status Report Self-Governance Coordinator David Edmunds Environmental Director PPN Mission and Vision Renewable Energy Feasibility Study: Overview Project Duration: May 2010- September 2011 Focus areas: - micro-hydroelectric, - geothermal heat pumps, * * - wind, - solar electric, - solar thermal * Primary Objective: - Deployment and development plan that has the renewable energy options and designs that meets the PPN's

  10. Ute Mountain Ute Tribe Community-Scale Solar Feasibility Study

    SciTech Connect (OSTI)

    Rapp, Jim; Knight, Tawnie

    2014-01-30

    Parametrix Inc. conducted a feasibility study for the Ute Mountain Ute Tribe to determine whether or not a community-scale solar farm would be feasible for the community. The important part of the study was to find where the best fit for the solar farm could be. In the end, a 3MW community-scale solar farm was found best fit with the location of two hayfield sites.

  11. YAVAPAI APACHE NATION BIOMASS FEASIBILITY STUDY

    Energy Savers [EERE]

    OVERVIEW OVERVIEW YAN Demographics Biomass Study Team YAN Biomass Study Background Project Rationale & Outline Project Progress Future Q&A YAN DEMOGRAPHICS YAN DEMOGRAPHICS * YAN Population = 1800 Enrolled Members * YAN Geography = 650 Acres in 5 Locations * Projected location of a Biomass Facility - Located in Verde Valley of Central Arizona - Middle Verde (On reservation) - Drake (30 Miles from the Reservation) YAN BIOMASS STUDY TEAM YAN BIOMASS STUDY TEAM * YAN Energy Director- Tracy

  12. Pueblo of Jemez Geothermal Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Study Organization Phase I- Geothermal Reservoirs and Geothermal Drilling at Jemez Pueblo by Jim Witcher, NMSUSDTI Compilation of four reports (district heating, native herbs ...

  13. Applicant Location Requested DOE Funds Project Summary Feasibility Studies

    Energy Savers [EERE]

    Requested DOE Funds Project Summary Feasibility Studies Confederated Salish and Kootenai Tribes Pablo, MT $850,000 This project will evaluate the technical and economic viability of a co-generation biomass fuel power plant. The plant would use fuels from tribal forest management activities to provide between 2.5 to 20 megawatts (MW) of electricity to heat tribal buildings or sell on the wholesale market. Standing Rock Sioux Tribe Fort Yates, ND $430,982 This project will perform a feasibility

  14. Pueblo of Laguna - Solar, Wind and Biomass Feasibility Study

    Energy Savers [EERE]

    Laguna Utility Authority Renewable Energy Feasibility Study DOE Tribal Energy Program Review October 2007 Pueblo of Laguna Reservation Pueblo of Laguna lands in West Central New Mexico cover more than 533,000 acres Pueblo of Laguna reservation location Six villages in Laguna with varying interests and needs have significant impact on Laguna decisions Seama Encinal Mesita Paguate Paraje Laguna Feasibility project focused heavily on Capacity Building and Community Outreach to ensure Laguna has

  15. Feasibility study: Assess the feasibility of siting a monitored retrievable storage facility. Phase 1

    SciTech Connect (OSTI)

    King, J.W.

    1993-08-01

    The purpose of phase one of this study are: To understand the waste management system and a monitored retrievable storage facility; and to determine whether the applicant has real interest in pursuing the feasibility assessment process. Contents of this report are: Generating electric power; facts about exposure to radiation; handling storage, and transportation techniques; description of a proposed monitored retrievable storage facility; and benefits to be received by host jurisdiction.

  16. CsIX/TRU Grout Feasibility Study

    SciTech Connect (OSTI)

    S. J. Losinski; C. M. Barnes; B. K. Grover

    1998-11-01

    A settlement agreement between the Department of Energy (DOE) and the State of Idaho mandates that liquid waste now stored at the Idaho Nuclear Technology Engineering Center (INTEC - formerly the Idaho Chemical Processing Plant, ICPP) will be calcined by the end of year 2012. This study investigates an alternative treatment of the liquid waste that removes undissolved solids (UDS) by filtration and removes cesium by ion exchange followed by cement-based grouting of the remaining liquid into 55-gal drums. Operations are assumed to be from January 2008 through December 2012. The grouted waste will be contact-handled and will be shipped to the Waste Isolation Pilot Plant (WIPP) in New Mexico for disposal. The small volume of secondary wastes such as the filtered solids and cesium sorbent (resin) would remain in storage at the Idaho National Engineering and Environmental Laboratory for treatment and disposal under another project, with an option to dispose of the filtered solids as a r emote-handled waste at WIPP.

  17. Coeur d'Alene Tribe Energy Efficiency Feasibility Study

    SciTech Connect (OSTI)

    Allgood, Tiffany L.; Sorter, Andy

    2015-01-13

    The Coeur d'Alene Tribe's Energy Efficiency Feasibility Study (EEFS) is the culminating document that compiles the energy efficiency and building performance assessment and project prioritization process completed on 36 Tribally owned and operated facilities within Tribal lands. The EEFS contains sections on initial findings, utility billing analyses, energy conservation measures and prioritization and funding sources and strategies for energy project implementation.

  18. Pueblo of Laguna Utility Authority Renewable Energy Feasibility Study

    SciTech Connect (OSTI)

    Carolyn Stewart, Red Mountain Tribal Energy

    2008-03-31

    The project, Renewable Energy Feasibility Study was designed to expand upon previous work done by the Tribe in evaluating utility formation, generation development opportunities, examining options for creating self-sufficiency in energy matters, and integrating energy management with the Tribes economic development goals. The evaluation of project locations and economic analysis, led to a focus primarily on solar projects.

  19. Small modular biopower initiative Phase 1 feasibility studies executive summaries

    SciTech Connect (OSTI)

    Bain, R.

    2000-03-06

    The Phase 1 objective is a feasibility study that includes a market assessment, resource assessment, preliminary system design, and assessment of relevant environmental and safety considerations, and evaluation of financial and cost issues, and a preliminary business plan and commercialization strategy. Each participating company will share at least 20% of the cost of the first phase.

  20. Feasibility study on the thorium fueled boiling water breeder reactor

    SciTech Connect (OSTI)

    PetrusTakaki, N.

    2012-07-01

    The feasibility of (Th,U)O 2 fueled, boiling water breeder reactor based on conventional BWR technology has been studied. In order to determine the potential use of water cooled thorium reactor as a competitive breeder, this study evaluated criticality, breeding and void reactivity coefficient in response to changes made in MFR and fissile enrichments. The result of the study shows that while using light water as moderator, low moderator to fuel volume ratio (MFR=0.5), it was possible to breed fissile fuel in negative void reactivity condition. However the burnup value was lower than the value of the current LWR. On the other hand, heavy water cooled reactor shows relatively wider feasible breeding region, which lead into possibility of designing a core having better neutronic and economic performance than light water with negative void reactivity coefficient. (authors)

  1. Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

    Broader source: Energy.gov [DOE]

    Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

  2. Hydrogen Fuel-Cell Funding Awarded for Feasibility Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fuel-Cell Funding Awarded for Feasibility Study - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste

  3. Wind & Hydro Energy Feasibility Study for the Yurok Tribe

    Energy Savers [EERE]

    Wind & Hydro Energy Feasibility Study for the Yurok Tribe DOE Tribal Energy Program Review Meeting Award #DE-FG36-07GO17078 October 27, 2010 Presented By: Austin Nova, Yurok Tribe Jim Zoellick, Schatz Energy Research Center Background/Location Located in Yurok northwest Reservation corner of Straddles the California lower stem of the Klamath River, 2 miles wide and 44 miles long) Background * Largest Indian Tribe in California * Traditional livelihood on the Yurok Reservation is based upon

  4. Pinoleville Pomo Nation Renewable Energy Feasibility Study Status

    Energy Savers [EERE]

    Pinoleville Pomo Nation Renewable Energy Feasibility Study Status David Edmunds Environmental Director, Pinoleville Pomo Nation Ryan Shelby Alfred P. Sloan Ph.D. Student Scholar, UC Berkeley 2009 U.S. Department of Energy Tribal Energy Program Review November 18, 2009 2 * Self-sufficiency * Job creation * Revenue creation * Cultural integrity Strategic Plan 3 * Choose energy technologies that reflect cultural values * Small-scale, multi-source energy to maintain flexibility and resilience *

  5. Feasibility Study for a Hopi Utility-Scale Wind Project

    Energy Savers [EERE]

    Slide 1 October 19, 2005 Feasibility Study for a Hopi Utility-Scale Wind Project Slide 2 WIND ENERGY CAN BENEFIT HOPI TRIBE New Economic Development * Electricity export sales create new revenues for Nation (lease royalties and equity return on investment) * Potentially fund rural electrification and smaller off-grid renewable applications * Contracting work in development and construction phases * New jobs Environmental * No air pollution or toxic emissions * Virtually no water use * Low land

  6. Bay Mills Indian Community Energy Reduction Feasibility Study

    Energy Savers [EERE]

    Tribal Council of Michigan, Inc. Environmental Services Division Chris Kushman Bay Mills Indian Community Energy Reduction Feasibility Study *DOE Tribal Energy Program *Tribal Energy Program Review presenters *Bay Mills Indian Community Thank You * Great relationship between ITCMI and Bay Mills * Proactive in exploring renewable energy alternatives - Bay Mills Community College Alternative Energy Curriculum - Biofuels and the crops to support biofuels - Wind resource data collection * Upper

  7. Native Village of Eyak Wind Energy Feasibility Study

    Energy Savers [EERE]

    Eyak Wind Energy Feasibility Study Prepared by Heath Kocan & Casey Pape Presented by Casey Pape Alternative Energy Coordinator Native Village of Eyak * Federally Recognized Tribe in Cordova, AK * Governed by a five- member tribal council * Provides health and social services, economic development, job training and environmental and resource management * 525 Tribal members Location of Project Cordova Why Wind Power? *Reduces petroleum use *Reduces carbon footprint *Cost can be competitive

  8. Feasibility Study for a Hopi Utility-Scale Wind Project

    SciTech Connect (OSTI)

    Kendrick Lomayestewa

    2011-05-31

    The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. The goal of this project was to investigate the feasibility for the generation of energy from wind and to parallel this work with the development of a tribal utility organization capable of undertaking potential joint ventures in utility businesses and projects on the Hopi reservation. Wind resource assessments were conducted at two study sites on Hopi fee simple lands located south of the city of Winslow. Reports from the study were recently completed and have not been compared to any existing historical wind data nor have they been processed under any wind assessment models to determine the output performance and the project economics of turbines at the wind study sites. Ongoing analysis of the wind data and project modeling will determine the feasibility of a tribal utility-scale wind energy generation.

  9. PUEBLO OF ZIA RENEWABLE ENERGY DEVELOPMENT FEASIBILITY STUDY

    SciTech Connect (OSTI)

    Pino, Peter M.; Lakshman, Jai; Toole, G. Loren; Witcher, James; Emerson, Michael A.; Turner, Jeremy; Sandidge, Wendy

    2014-06-30

    The Pueblo of Zia will conduct a comprehensive feasibility study for best-use application(s) for development of renewable energy resources on its tribally held TRUST lands (i.e., Trust Lands of Zia Indian Reservation). The feasibility study is essential for determining the technical and economic viability of a future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe. Project Objectives: The feasibility study is essential for determining the technical and economic viability of future renewable project(s) on Zia tribal lands, including the potential economic and environmental benefits for the Tribe to: 1. Provide a balanced local renewable power supply for Zia Pueblo, its members, tribal offices, schools and buildings, and businesses on tribal lands 2. Provide a firm power supply for export and commercial market distribution 3. Provide economic development for the Tribe and its members, including job training and creation, each in accordance with the goals and objectives as conveyed by the Pueblo of Zia Tribal Council, Tribal Administration, and outlined in The Pueblo of Zia Comprehensive Plan and Pueblo of Zia — Zia Enterprise Zone Master Plan. A key goal of the study is to analyze the integrated development of solar, geothermal, and wind renewable energy resources at Zia Pueblo, with added potential to combine gas-fired generation to accomplish energy firming. Geothermal offers a base load source of energy, providing power continuously for end users. Wind and solar offer intermediate and peaking sources of energy, which can be harvested throughout the day, with periods of variable but predicable output. Variability will be managed in an integrated manner, using Zia Pueblo's combined renewable resources to generate high-quality power. Tasks are intended to collect, catalog, map, and analyze existing data on Zia Pueblo's renewable energy resource base and then match resource attributes with the most suitable renewable technologies for tribal energy consumption and needs. Also, key impacts on cultural and social values of Zia Pueblo will be addressed. Selected most favorable uses and technologies will be further investigated to determine initial feasibility and market for business development for up to six sites located on tribal land. The anticipated result will be the recommended development of sites that have sufficient background study completed to warrant a business plan, detailed engineering feasibility, and acquisition of project financing. Valuable technical and economic information will accrue from this study that may be applied to scale up or down the various power technology potential on Zia Pueblo for maximum benefit and best area(s) of application, project phasing and potential for future replicability and expansion.

  10. Market assessment and technical feasibility study of PFBC ash use

    SciTech Connect (OSTI)

    Smith, V.E.; Bland, A.E.; Brown, T.H.; Georgiou, D.N.; Wheeldon, J.

    1994-10-01

    The overall objectives of this study are to determine the market potential and the technical feasibility of using PFBC ash in high volume ash use applications. The information will be of direct use to the utility industry in assessing the economics of PFBC power generation in light of ash disposal avoidance through ash marketing. In addition, the research is expected to result in the generation of generic data on the use of PFBC ash that could lead to novel processing options and procedures. The specific objectives of the proposed research and demonstration effort are: Define resent and future market potential of PFBC ash for a range of applications (Phase I); assess the technical feasibility of PFBC ash use in construction, civil engineering and agricultural applications (Phase II); and demonstrate the most promising of the market and ash use options in full-scale field demonstrations (Phase III).

  11. Pascua Yaqui Tribe Renewable Energy Development and Deployment Feasibility Study

    SciTech Connect (OSTI)

    Arvayo, Maria

    2014-05-30

    In 2012, PYT was awarded a grant from the Department of Energy Tribal Energy Program to conduct a Renewable Energy Development and Deployment Feasibility Study that would define the technical and economic viability of renewable energy on tribal lands. Red Mountain Energy Partners (RMEP) was hired by PYT to complete the study. Through this study, Red Mountain concluded that there are viable opportunities for solar at Tortuga Ranch, the Casino del Sol and a third site near the Justice Center on Camino de Oeste.

  12. Ryazan power plant feasibility study. Volume 2. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This study was funded by the U.S. Trade and Development Agency on behalf of the Ryazan Power Plant Joint Stock Company to assess the feasibility of rehabilitating the Ryazan Power Plant in Novomichurinsk, Russia. The scope of this study includes reviewing plant equipment and operations as well as making recommendations for upgrade to present day plant standards. The main emphasis of the report is on boiler analysis, but also includes all equipment from coal entering the plant to electrical power leaving the plant. This is the second of two volumes and is divided into the following sections: (C) Technical - Sections 6-18; (D) Commercial; (E) Socioeconomic Considerations; (F) Conclusions.

  13. 100-D/H Remedial Investigation/ Feasibility Study /Proposed Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Remedial Investigation/ Feasibility Study /Proposed Plan Nina Menard Washington State Department of Ecology 100-D/H RI/FS/PP * Received Draft RI/FS/PP on December 14, 2012 * Submitted comments to DOE on March 12, 2013 * DOE and Ecology are meeting to start the resolution process 100-D/H RI/FS/PP * Good points o Fairly well written o Results of borehole data didn't find any smoking guns. 100-D/H RI/FS/PP Issues o Selection of Contaminants Of Concern/Contaminants Of Potential Concern (COC/COPC) o

  14. Feasibility Study of Biomass Electrical Generation on Tribal Lands

    SciTech Connect (OSTI)

    Tom Roche; Richard Hartmann; Joohn Luton; Warren Hudelson; Roger Blomguist; Jan Hacker; Colene Frye

    2005-03-29

    The goals of the St. Croix Tribe are to develop economically viable energy production facilities using readily available renewable biomass fuel sources at an acceptable cost per kilowatt hour ($/kWh), to provide new and meaningful permanent employment, retain and expand existing employment (logging) and provide revenues for both producers and sellers of the finished product. This is a feasibility study including an assessment of available biomass fuel, technology assessment, site selection, economics viability given the foreseeable fuel and generation costs, as well as an assessment of the potential markets for renewable energy.

  15. Feasibility Study for Operable Unit 7-13/14

    SciTech Connect (OSTI)

    K. Jean Holdren Thomas E. Bechtold Brian D. Preussner

    2007-05-29

    The Subsurface Disposal Area is a radioactive waste landfill located within the Radioactive Waste Management Complex at the Idaho National Laboratory Site in southeastern Idaho. This Feasibility Study for Operable Unit 7-13/14 analyzes options for mitigating risks to human health and the environment associated with the landfill. Analysis is conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, using nine evaluation criteria to develop detailed and comparative analysis of five assembled alternatives. Assembled alternatives are composed of discrete modules. Ultimately, decision-makers will select, recombine, and sum various modules into an optimized preferred alternative and final remedial decision.

  16. Feasibility Study: Potential Enhancements for the LLNL Renewables Website

    SciTech Connect (OSTI)

    Kearns, F; Krawchuk, M; Moritz, M; Stephens, S; Goldstein, N

    2008-01-25

    This feasibility study investigates additional improvements/extensions to the LLNL Renewables Website. Currently, the Renewables Website focuses on wind energy in California. Future enhancements will include other renewable energy sources. The extensions described below are focused along two separate yet related avenues: (1) Forecasting wildfire risk in the regions of California where new development may occur, as a part of the 'Million Solar Roofs' program. (2) Gaining a better understanding of the ecological components and potential of biofuels from forests in California. These two avenues are further described in the report. Following is a technical description of the Center for Fire Research and Outreach computing and web service capabilities.

  17. Engineering feasibility study of remanufacture of chain saws

    SciTech Connect (OSTI)

    Lund, R.T.; Skeels, F.D.; Heaton, G.R. Jr.; Grand, R.; Beardsley, D.L.; Gonzalez, T.A.

    1982-08-01

    This is the fourth in a series of studies on the subject of manufacturing, conducted by the Center for Policy Alternatives of the Massachusetts Institute of Technology and sponsored by the Alternative Materials Utilization Branch of the Office of Industrial Programs, US Department of Energy. These pioneering studies have served to examine the nature and extent of remanufacturing in the US, the energy and materials conservation potential of this activity, and opportunities for further development of commercially viable remanufacturing enterprises. In this volume we present a preliminary engineering feasibility study of the remanufacture of chain saws, one of the products that had been identified in an earlier study as offering an attractive opportunity for an extension of the remanufacturing concept.

  18. Battery energy storage market feasibility study -- Expanded report

    SciTech Connect (OSTI)

    Kraft, S.; Akhil, A.

    1997-09-01

    Under the sponsorship of the US Department of Energy`s Office of Utility Technologies, the Energy Storage Systems Analysis and Development Department at Sandia National Laboratories (SNL) contracted Frost and Sullivan to conduct a market feasibility study of energy storage systems. The study was designed specifically to quantify the battery energy storage market for utility applications. This study was based on the SNL Opportunities Analysis performed earlier. Many of the groups surveyed, which included electricity providers, battery energy storage vendors, regulators, consultants, and technology advocates, viewed battery storage as an important technology to enable increased use of renewable energy and as a means to solve power quality and asset utilization issues. There are two versions of the document available, an expanded version (approximately 200 pages, SAND97-1275/2) and a short version (approximately 25 pages, SAND97-1275/1).

  19. A Feasibility Study of an e e- Ring Collider for Higgs Factory...

    Office of Scientific and Technical Information (OSTI)

    A Feasibility Study of an e e- Ring Collider for Higgs Factory Citation Details In-Document Search Title: A Feasibility Study of an e e- Ring Collider for Higgs Factory Authors: ...

  20. Electric Power Delivery Testing Feasibility Study Task 6 Final Report

    SciTech Connect (OSTI)

    Thomas Tobin

    2009-07-01

    This Final Report is covers the completion of the Electric Power Delivery Testing Feasibility Study. The objective of this project was to research, engineer, and demonstrate high-power laboratory testing protocols to accurately reproduce the conditions on the electric power grid representing both normal load switching and abnormalities such as short-circuit fault protection. Test circuits, equipment, and techniques were developed and proven at reduced power levels to determine the feasibility of building a large-scale high-power testing laboratory capable of testing equipment and systems at simulated high-power conditions of the U.S. power grid at distribution levels up through 38 kiloVolts (kV) and transmission levels up through 230 kV. The project delivered demonstrated testing techniques, high-voltage test equipment for load testing and synthetic short-circuit testing, and recommended designs for future implementation of a high-power testing laboratory to test equipment and systems, enabling increased reliability of the electric transmission and distribution grid.

  1. Ryazan power plant feasibility study. Volume 1. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    This study was funded by the U.S. Trade and Development Agency on behalf of the Ryazan Power Plant Joint Stock Company to assess the feasibility of rehabilitating the Ryazan Power Plant in Novomichurinsk, Russia. The scope of this study includes reviewing plant equipment and operations as well as making recommendations for upgrade to present day plant standards. The main emphasis of the report is on boiler analysis, but also includes all equipment from coal entering the plant to electrical power leaving the plant. This is the first of two volumes and is divided into the following sections: (A) Abstract; (B) Evaluation of Alternative Technologies; (C) Technical: Section 1- Coal Handling, Section 2- Feeders and Pulverizers, Section 3- Boiler, Section 4- Ash Handling, Section 5- Electrostatic Precipitator.

  2. Grand Traverse Band Renewable Energy Feasibility Study in Wind, Biomass and Solar

    SciTech Connect (OSTI)

    Suzanne McSawby, Project Director Steve Smiley, Principle Investigator Grand Traverse Resort, Cost Sharing Partner

    2008-12-31

    Renewable Energy Feasibility Study for wind, biomass, solar on the Grand Traverse Band tribal lands from 2005 - 2008

  3. Document Number 00029500 Focused Feasibilitv Studv 5.0 Focused Feasibility Study

    Office of Legacy Management (LM)

    00029500 Focused Feasibilitv Studv 5.0 Focused Feasibility Study The purpose of a CERCLA feasibility study is to develop, screen, and analyze potential remedial options for managing risk at uncontrolled hazardous waste sites (EPA 1988) in a manner that "reflect[s] the scope and complexity of the remedial action under consideration and the site problems being addressed" (EPA 1990). The feasibility study presented in this section is a focused feasibility study (FFS) because it follows

  4. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect (OSTI)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  5. Final Report - Wind and Hydro Energy Feasibility Study - June 2011

    SciTech Connect (OSTI)

    Jim Zoellick; Richard Engel; Rubin Garcia; Colin Sheppard

    2011-06-17

    This feasibility examined two of the Yurok Tribe's most promising renewable energy resources, wind and hydro, to provide the Tribe detailed, site specific information that will result in a comprehensive business plan sufficient to implement a favorable renewable energy project.

  6. Feasibility Study of Accelerator Driven System Proposed by JAEA

    SciTech Connect (OSTI)

    Sugawara, Takanori; Nishihara, Kenji; Tsujimoto, Kazufumi; Iwanaga, Kohei; Kurata, Yuji; Sasa, Toshinobu; Oigawa, Hiroyuki

    2007-07-01

    Accelerator Driven System (ADS) has been studied to transmute minor actinides (MA) discharged from spent fuel of commercial nuclear power plants. In Japan Atomic Energy Agency (JAEA), various R and D for an 800 MWt, lead bismuth eutectic (LBE) cooled ADS have been performed. The feasibility for the ADS is discussed in the present study in terms of the neutronics design, the safety analysis and the design of the beam window. In the neutronics design, the maximum temperature at the surface of the fuel pin was decreased from 578 deg. C to 498 deg. C by the adjustment of the ZrN inert matrix ratio for four zones. In the safety analysis, it was confirmed that there was very little possibility of core disruptive accidents at unprotected accidents in the ADS proposed by JAEA. For the design of the beam window, the parametric survey for the buckling failure was performed to discuss the methods to increase the margin for the buckling pressure. (authors)

  7. Structural Design Feasibility Study for the Global Climate Experiment

    SciTech Connect (OSTI)

    Lewin,K.F.; Nagy, J.

    2008-12-01

    Neon, Inc. is proposing to establish a Global Change Experiment (GCE) Facility to increase our understanding of how ecological systems differ in their vulnerability to changes in climate and other relevant global change drivers, as well as provide the mechanistic basis for forecasting ecological change in the future. The experimental design was initially envisioned to consist of two complementary components; (A) a multi-factor experiment manipulating CO{sub 2}, temperature and water availability and (B) a water balance experiment. As the design analysis and cost estimates progressed, it became clear that (1) the technical difficulties of obtaining tight temperature control and maintaining elevated atmospheric carbon dioxide levels within an enclosure were greater than had been expected and (2) the envisioned study would not fit into the expected budget envelope if this was done in a partially or completely enclosed structure. After discussions between NEON management, the GCE science team, and Keith Lewin, NEON, Inc. requested Keith Lewin to expand the scope of this design study to include open-field exposure systems. In order to develop the GCE design to the point where it can be presented within a proposal for funding, a feasibility study of climate manipulation structures must be conducted to determine design approaches and rough cost estimates, and to identify advantages and disadvantages of these approaches including the associated experimental artifacts. NEON, Inc requested this design study in order to develop concepts for the climate manipulation structures to support the NEON Global Climate Experiment. This study summarizes the design concepts considered for constructing and operating the GCE Facility and their associated construction, maintenance and operations costs. Comparisons and comments about experimental artifacts, construction challenges and operational uncertainties are provided to assist in selecting the final facility design. The overall goal of this report is to provide a cost and technological basis for selection of the appropriate GCE Facility design.

  8. Feasibility study of medical isotope production at Sandia National Laboratories

    SciTech Connect (OSTI)

    Massey, C.D.; Miller, D.L.; Carson, S.D.

    1995-12-01

    In late 1994, Sandia National Laboratories in Albuquerque, New Mexico, (SNL/NM), was instructed by the Department of Energy (DOE) Isotope Production and Distribution Program (IPDP) to examine the feasibility of producing medically useful radioisotopes using the Annular Core Research Reactor (ACRR) and the Hot Cell Facility (HCF). Los Alamos National Laboratory (LANL) would be expected to supply the targets to be irradiated in the ACRR. The intent of DOE would be to provide a capability to satisfy the North American health care system demand for {sup 99}Mo, the parent of {sup 99m}Tc, in the event of an interruption in the current Canadian supply. {sup 99m}Tc is used in 70 to 80% of all nuclear medicine procedures in the US. The goal of the SNL/NM study effort is to determine the physical plant capability, infrastructure, and staffing necessary to meet the North American need for {sup 99}Mo and to identify and examine all issues with potential for environmental impact.

  9. Revised CTUIR Renewable Energy Feasibility Study Final Report

    SciTech Connect (OSTI)

    John Cox; Thomas Bailor; Theodore Repasky; Lisa Breckenridge

    2005-10-31

    This preliminary assessment of renewable energy resources on the Umatilla Indian Reservation (UIR) has been performed by CTUIR Department of Science and Engineering (DOSE). This analysis focused primarily identifying renewable resources that may be applied on or near the Umatilla Indian Reservation. In addition preliminary technical and economic feasibility of developing renewable energy resources have been prepared and initial land use planning issues identified. Renewable energies examined in the course of the investigation included solar thermal, solar photovoltaic, wind, bioethanol, bio-diesel and bio-pellet fuel. All renewable energy options studied were found to have some potential for the CTUIR. These renewable energy options are environmentally friendly, sustainable, and compliment many of the policy goals of the CTUIR. This report seeks to provide an overall review of renewable energy technologies and applications. It tries to identify existing projects near to the CTUIR and the efforts of the federal government, state government and the private sector in the renewable energy arena. It seeks to provide an understanding of the CTUIR as an energy entity. This report intends to provide general information to assist tribal leadership in making decisions related to energy, specifically renewable energy deve lopment.

  10. Fort Yukon, Chalkyitsik, & Venetie Biomass Boiler Feasibility Study

    SciTech Connect (OSTI)

    Greg Koontz, ME William A. Wall, PhD

    2009-03-31

    The Council of Athabascan Tribal Governments (CATG) is a consortium of ten Gwich'in and Koyukon Athabascan tribes settled in 10 remote villages and are linked by the Yukon River System. The CATG mission is to maintain the Yukon Flats region as Indian Country by asserting traditional rights and taking responsibility for developing tribal technical capacity to manage the land and resources. It is the intent of CATG to explore and develop all opportunities for a renewable and self-sufficient energy program for each of the villages. CATG envisions utilization of forest resources both for construction and energy as one of the best long-term strategies for integrating the economic goals for the region as well as supporting the cultural and social issues. The intent for this feasibility project is to focus specifically on biomass utilization for heat, first, and for future electrical generation within the region, second. An initial determination has already been made regarding the importance of wood energy as a primary source of renewable energy to displace diesel fuel in the Yukon Flats region. A desktop study of other potential renewable resources was conducted in 2006.

  11. Comprehensive Renewable Energy Feasibility Study for Sealaska Corporation

    SciTech Connect (OSTI)

    Robert Lynette; John Wade: Larry Coupe

    2006-06-30

    The purposes of this project were: (1) to conduct a comprehensive feasibility study to determine the potential sustainability of wind and/or small hydroelectric power plants on Southeast Alaska native village lands, and (2) to provide the villages with an understanding of the requirements, costs, and benefits of developing and operating wind or small hydroelectric power plants. The program was sponsored by the Tribal Energy program, Office of Energy Efficiency and Renewable Energy, US Department of Energy. The Contractor was Sealaska Corporation, the Regional Native Corporation for Southeast Alaska that includes 12 village/urban corporations. Most villages are isolated from any central electric transmission and use diesel-electric systems for power generation, making them prime candidates for deploying renewable energy sources. Wind Energy - A database was assembled for all of the candidate sites in SE Alaska, including location, demographics, electricity supply and demand, existing and planned transmission interties with central generation, topographical maps, macro wind data, and contact personnel. Field trips were conducted at the five candidate villages that were deemed most likely to have viable wind resources. Meetings were held with local village and utility leaders and the requirements, costs, and benefits of having local renewable energy facilities were discussed. Two sites were selected for anemometry based on their needs and the probability of having viable wind resources – Yakutat and Hoonah. Anemometry was installed at both sites and at least one year of wind resource data was collected from the sites. This data was compared to long-term data from the closest weather stations. Reports were prepared by meteorologist John Wade that contains the details of the measured wind resources and energy production projections. Preliminary financial analysis of hypothetical wind power stations were prepared to gauge the economic viability of installing such facilities at each site. The average wind resources measured at Yakutat at three sites were very marginal, with an annual average of 4.0 mps (9 mph) at 60 meters above ground level. At Hoonah, the average wind resources measured on the 1,417 ft elevation ridge above the village were very low, with a six-month average of 3.9 mps (8.7 mph) at 60 meters above ground level. The wind resources at both sites were not sufficient to justify installation of wind turbines. In summary, although there are several known windy spots in SE Alaska (e.g., Skagway), we were not able to identify any isolated Native American villages that utilize diesel-electric power generation that have commercially viable wind resources. Small Hydroelectric - The study focused on the communities associated with Sealaska Corporation that use diesel-electric for electricity and have a potential for hydroelectric power generation. Most of them have had at least an assessment of hydroelectric potential, and a few have had feasibility studies of potential hydroelectric projects. Although none of the sites examined are financially viable without substantial grant funding, Hoonah, Kake, and Yakutat appear to have the best potential for new hydro facilities.

  12. Pueblo of Jemez Geothermal Feasibility Study Fianl Report

    SciTech Connect (OSTI)

    S.A. Kelley; N. Rogers; S. Sandberg; J. Witcher; J. Whittier

    2005-03-31

    This project assessed the feasibility of developing geothermal energy on the Pueblo of Jemez, with particular attention to the Red Rocks area. Geologic mapping of the Red Rocks area was done at a scale of 1:6000 and geophysical surveys identified a potential drilling target at a depth of 420 feet. The most feasible business identified to use geothermal energy on the reservation was a greenhouse growing culinary and medicinal herbs. Space heating and a spa were identified as two other likely uses of geothermal energy at Jemez Pueblo. Further geophysical surveys are needed to identify the depth to the Madera Limestone, the most likely host for a major geothermal reservoir.

  13. Feasibility Study for Renewable Energy Development on Tribal Lands

    SciTech Connect (OSTI)

    John Hendrix, Project Director; Charles Weir, Project Manager; Dr. John Plodinec, Technology Advisor; Dr. Steve Murray, Economic Advisor

    2005-07-21

    Project Objective: The Mississippi Band of Choctaw Indians (MBCI) conducted a study of the feasibility of siting a renewable energy biomass-based installation on tribal lands. The purpose of the study was to determine whether such an installation can be economically sustainable, as well as consistent with the cultural, social, and economic goals of the Tribe. Scope: To achieve the goal of the feasibility study, the following tasks were carried out: (1) Resource availability assessment--The objective of this assessment was to determine the availability of both poultry litter and wood residues for use in the proposed facility. (2) Power utilization assessment--The objective of this assessment was to determine the potential market size for power produced, the existing infrastructure for delivering power to that market, and the costs and economic returns for doing so. (3) Technology review--The objective of this review was to identify one, or more, technical options for detailed economic and technical assessment. The study considered a range of feedstock and product mixtures of poultry litter; wood residues as feedstock; and electrical power and other ancillary products as outputs. Distributed power sources was also examined. Technologies ranging from gasification to systems that produce both power and value-added chemicals were considered. Technologies selected for detailed review were those that can be sized to process the amount of available feed (poultry litter, or poultry litter and wood residues), and that also appear to make economic sense in terms of the value of their inputs. The technology review leaned heavily on the experience from similar prior DOE projects, particularly those conducted by the National Renewable Energy Laboratory (NREL). NREL was involved in a consultative role, so that the project team could leverage their experience. (4) Systems Design(s)--Based on the technology review, a pre-conceptual design for an installation was developed. This included identification of unit operations and equipment, maintenance, manpower, feedstock requirements, and output (power and any other ancillary products). Energy and mass flows were identified. (5) Manpower development assessment--The objectives of this assessment was to identify training needs for the selected option(s), and determine how they can best be met. Using the manpower estimates from the pre-conceptual system design, skills and training needs were to be identified. A plan for providing the needed manpower was to be developed, and any associated costs determined. (6) Economic assessment--The objective of this assessment was to determine the economic viability and sustainability of the technology option(s) identified through the technical review option. The costs of bringing the feedstock to the proposed facility were combined with nominal operation costs and potential production distribution costs to identify total costs. Revenue from power distribution (and, possibly, from sale of ancillary products) were combined with any possible government credits or payments to identify gross revenue. Economic viability was determined by net revenue and return on investment. A business plan for the selected option was to be produced that would consider long-term sustainability of the project. (7) MBCI compatibility assessment--The objective of this assessment was to determine whether the renewable energy technology was compatible with the MBCI's cultural, social and economic values. As part of this assessment, the environmental impacts and benefits were to be determined (Environmental stewardship is an important part of the Choctaw culture.). The effects of a project on employment were projected. The compatibility of the renewable energy project with MBCI cultural and social values were determined. Most importantly, the compatibility of the renewable energy installation with the MBCIs economic development goals and directions were determined. A project team led by the Mississippi Band of Choctaw Indians (MBCI) conducted the feasibility study. The team included the Mississippi Alternative Energy Enterprise (MAEE), the Mississippi State University Food and Fiber Center, Mississippi State University Diagnostic Instrumentation and Analysis Laboratory (DIAL), and the Mississippi State University Department of Electrical and Computer Engineering. This report and its findings are based on the best available data existing during the covering period and the analysis reflects good faith estimates and assumptions of factors for a biomass-based renewable energy project for the Mississippi Band of Choctaw Indians and any conclusions or finding herein should not be extrapolated to other areas of the country.

  14. Feasibility study report for the 200-BP-1 operable unit

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    This feasibility study examines a range of alternatives and provides recommendations for selecting a preferred alternative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965--1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area, groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-levels of contamination with cesium-137, radium-226, strontium-90, thorium-228, and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9{times}10{sup {minus}5}.

  15. Livingston Parish Landfill Methane Recovery Project (Feasibility Study)

    SciTech Connect (OSTI)

    White, Steven

    2012-11-15

    The Woodside Landfill is owned by Livingston Parish, Louisiana and is operated under contract by Waste Management of Louisiana LLC. This public owner/private operator partnership is commonplace in the solid waste industry today. The landfill has been in operation since approximately 1988 and has a permitted capacity of approximately 41 million cubic yards. Based on an assumed in-place waste density of 0.94 ton per cubic yard, the landfill could have an expected design capacity of 39.3 million tons. The landfill does have an active landfill gas collection and control system (LFGCCS) in place because it meets the minimum thresholds for the New Source Performance Standards (NSPS). The initial LFGCS was installed prior to 2006 and subsequent phases were installed in 2007 and 2010. The Parish received a grant from the United States Department of Energy in 2009 to evaluate the potential for landfill gas recovery and utilization at the Woodside Landfill. This includes a technical and economic feasibility study of a project to install a landfill gas to energy (LFGTE) plant and to compare alternative technologies. The LFGTE plant can take the form of on-site electrical generation, a direct use/medium Btu option, or a high-Btu upgrade technology. The technical evaluation in Section 2 of this report concludes that landfill gas from the Woodside landfill is suitable for recovery and utilization. The financial evaluations in sections 3, 4, and 5 of this report provide financial estimates of the returns for various utilization technologies. The report concludes that the most economically viable project is the Electricity Generation option, subject to the Parish’s ability and willingness to allocate adequate cash for initial capital and/or to obtain debt financing. However, even this option does not present a solid return: by our estimates, there is a 19 year simple payback on the electricity generation option. All of the energy recovery options discussed in this report economically stressed. The primary reason for this is the recent fundamental shift in the US energy landscape. Abundant supplies of natural gas have put downward pressure on any project that displaces natural gas or natural gas substitutes. Moreover, this shift appears long-term as domestic supplies for natural gas may have been increased for several hundred years. While electricity prices are less affected by natural gas prices than other thermal projects, they are still significantly affected since much of the power in the Entergy cost structure is driven by natural gas-fired generation. Consequently, rates reimbursed by the power company based on their avoided cost structure also face downward pressure over the near and intermediate term. In addition, there has been decreasing emphasis on environmental concerns regarding the production of thermal energy, and as a result both the voluntary and mandatory markets that drive green attribute prices have softened significantly over the past couple of years. Please note that energy markets are constantly changing due to fundamental supply and demand forces, as well as from external forces such as regulations and environmental concerns. At any point in the future, the outlook for energy prices may change and could deem either the electricity generation or pipeline injection project more feasible. This report is intended to serve as the primary background document for subsequent decisions made at Parish staff and governing board levels.

  16. FEASIBILITY STUDY OF PRESSURE PULSING PIPELINE UNPLUGGING TECHNOLOGIES FOR HANFORD

    SciTech Connect (OSTI)

    Servin, M. A.; Garfield, J. S.; Golcar, G. R.

    2012-12-20

    The ability to unplug key waste transfer routes is generally essential for successful tank farms operations. All transfer lines run the risk of plugging but the cross site transfer line poses increased risk due to its longer length. The loss of a transfer route needed to support the waste feed delivery mission impacts the cost and schedule of the Hanford clean up mission. This report addresses the engineering feasibility for two pressure pulse technologies, which are similar in concept, for pipeline unplugging.

  17. Sei Vojany Station repowering reconstruction-assessment feasibility study. Volume 1. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    The feasibility study conducted for Slovensky Energeticky Podnik (Slovak Energy Production Company) (SEP) evaluates reconstruction, repowering, and expansion of SEP's Vojany Station (EVO). Previous evaluations, studies, station records, and technical data were reviewed and utilized as a part of the feasibility analysis. The study results recommend a time-phased implementation for the recommended solutions.

  18. Comprehensive Renewable Energy Feasibility Study for the Makah Indian Tribe

    SciTech Connect (OSTI)

    RobertLynette; John Wade; Larry Coupe

    2005-03-31

    The purpose of this project was to determine the technical feasibility, economic viability, and potential impacts of installing and operating a wind power station and/or small hydroelectric generation plants on the Makah reservation. The long-term objective is to supply all or a portion of Tribe's electricity from local, renewable energy sources in order to reduce costs, provide local employment, and reduce power outages. An additional objective was for the Tribe to gain an understanding of the requirements, costs, and benefits of developing and operating such plants on the reservation. The Makah Indian Reservation, with a total land area of forty-seven square miles, is located on the northwestern tip of the Olympic Peninsula in Washington State. Four major watersheds drain the main Reservation areas and the average rainfall is over one hundred inches per year. The reservation's west side borders the Pacific Ocean, but mostly consists of rugged mountainous terrain between 500 and 1,900 feet in elevation. Approximately 1,200 tribal members live on the Reservation and there is an additional non-Indian residential population of about 300. Electric power is provided by the Clallam County PUD. The annual usage on the reservation is approximately 16,700 mWh. Project Work Wind Energy--Two anemometer suites of equipment were installed on the reservation and operated for a more than a year. An off-site reference station was identified and used to project long-term wind resource characteristics at the two stations. Transmission resources were identified and analyzed. A preliminary financial analysis of a hypothetical wind power station was prepared and used to gauge the economic viability of installation of a multi-megawatt wind power station. Small Hydroelectric--Two potential sites for micro/small-hydro were identified by analysis of previous water resource studies, topographical maps, and conversations with knowledgeable Makah personnel. Field trips were conducted to collect preliminary site data. A report was prepared by Alaska Power & Telephone (Larry Coupe) including preliminary layouts, capacities, potential environmental issues, and projected costs. Findings and Conclusions Wind Energy The average wind resources measured at both sites were marginal, with annual average wind speeds of 13.6-14.0 mph at a 65-meter hub height, and wind shears of 0.08-0.13. Using GE 1.5 MW wind turbines with a hub height of 65 meters, yields a net capacity factor of approximately 0.19. The cost-of-energy for a commercial project is estimated at approximately 9.6 cents per kWh using current costs for capital and equipment prices. Economic viability for a commercial wind power station would require a subsidy of 40-50% of the project capital cost, loans provided at approximately 2% rate of interest, or a combination of grants and loans at substantially below market rates. Recommendations: Because the cost-of-energy from wind power is decreasing, and because there may be small pockets of higher winds on the reservation, our recommendation is to: (1) Leave one of the two anemometer towers, preferably the 50-meter southern unit MCC, in place and continue to collect data from this site. This site would serve as an excellent reference anemometer for the Olympic Peninsula, and, (2) If funds permit, relocate the northern tower (MCB) to a promising small site closer to the transmission line with the hope of finding a more energetic site that is easier to develop. Small Hydroelectric There are a very limited number of sites on the reservation that have potential for economical hydroelectric development, even in conjunction with water supply development. Two sites emerged as the most promising and were evaluated: (1) One utilizing four creeks draining the north side of the Cape Flattery peninsula (Cape Creeks), and (2) One on the Waatch River to the south of Neah Bay. The Cape Creeks site would be a combination water supply and 512 kW power generation facility and would cost a approximately $11,100,000. Annual power generation would be approximately 1,300,000 kWh and the plant would have a cost-of-energy of approximately 65 cents per kWh, substantially above market rates. The Waatch site would also be a combination water supply and power generation facility. It would have a rated capacity of 935 kW and would cost approximately $16,400,000. Annual power generation would be approximately 3,260,000 kWh and the plant would have a cost-of-energy of approximately 38 cents per kWh, also substantially above market rates. Recommendation: Stand-alone hydroelectric development is not commercially viable. The Tribal Council should not pursue development of hydroelectric facilities on the Makah Reservation unless they are an adjunct to a water supply development, and the water supply systems absorbs almost all the capital cost of the project.

  19. Sei Vojany Station repowering reconstruction assessment feasibility study. Volume 3. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1992-01-01

    The feasibility study conducted for Slovensky Energeticky Podnik(Slovak Energy Production Company) (SEP) evaluates reconstruction, repowering, and expansion of SEP's Vojany Station(EVO). The study recommends a training program for government and plant officials.

  20. Renewable Energy Development on Fort Mojave Reservation Feasiblity Study

    SciTech Connect (OSTI)

    Russell Gum, ERCC analytics LLC

    2008-03-17

    The Ft. Mojave tribe, whose reservation is located along the Colorado River in the states of Arizona, California, and Nevada near the point where all three states meet, has a need for increased energy supplies. This need is a direct result of the aggressive and successful economic development projects undertaken by the tribe in the last decade. While it is possible to contract for additional energy supplies from fossil fuel sources it was the desire of the tribal power company, AHA MACAV Power Service (AMPS) to investigate the feasibility and desirability of producing power from renewable sources as an alternative to increased purchase of fossil fuel generated power and as a possible enterprise to export green power. Renewable energy generated on the reservation would serve to reduce the energy dependence of the tribal enterprises on off reservation sources of energy and if produced in excess of reservation needs, add a new enterprise to the current mix of economic activities on the reservation. Renewable energy development would also demonstrate the tribe’s support for improving environmental quality, sustainability, and energy independence both on the reservation and for the larger community.

  1. Feasibility study for integrated solar cell manufacture in Russia. Export trade information

    SciTech Connect (OSTI)

    1998-07-01

    This report, conducted by Global Photovoltaic Specialists, Inc., was funded by the US Trade and Development Agency. The study concerns the techno-economic feasibility of fully integrated photovoltaic manufacture in Russia. In addition to the executive summary, the study consists of the following: (1) background of the project; (2) world market study; (3) technology prospects; (4) techno-economic feasibility-proprietary deleted; (5) financial-proprietary deleted; (6) conclusions and recommendations; (7) references; (8) bibliography.

  2. Wind and Hydroelectric Feasibility Study - Bristol Bay Native Corporation Anchorage, Alaska

    Energy Savers [EERE]

    Bristol Bristol Bay Bay Native Native Corporation Corporation Wind and Wind and Hydroelectric Hydroelectric Feasibility Feasibility Study Study Tiel Smith Tiel Smith - - BBNC BBNC Doug Vaught, PE Doug Vaught, PE - - Consultant Consultant A Landscape of Promise Bristol Bay Native Corporation Invested in the Region * Southwest Alaska - 29 communities - 7,800 residents - 10,000 brown bears - 55,000,000 salmon * 40,000 square miles- about size of Ohio * 68% Native - Yup'ik Eskimo - Athabascan -

  3. Confederated Tribes of Warm Springs - Wind Feasibility Study

    Office of Environmental Management (EM)

    * Elcon Associates: Transmission System Studies * ... * Mutton Mountain Tower Site 1 - 50 Meter Tower ... Of Model Is High - Hub Height Wind Speeds - 17.5 to 18.5 ...

  4. Solar Applications to Multiple County Buildings Feasibility Study

    Broader source: Energy.gov [DOE]

    This study was requested by Salt Lake County in an effort to obtain a cursory overview of solar electric and solar thermal application possibilities on the rooftops of existing county buildings. The subject buildings represent various County Divisions: Aging Services, Community Services, County Health, County Library, Parks & Recreation, Public Works, County Sheriff and Youth Services. There are fifty two buildings included in the study.

  5. Energy Efficiency in Separate Tenant Spaces … A Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Study Table of Contents 1. Executive Summary ..................................................................................................................................... 1 2. Introduction, Definition of Scope and Existing Efforts ................................................................................ 3 2.1 Introduction and Legislative Mandate................................................................................................. 3 2.2 Definition of Scope

  6. Feasibility Study for Vitrification of Sodium-Bearing Waste

    SciTech Connect (OSTI)

    J. J. Quigley; B. D. Raivo; S. O. Bates; S. M. Berry; D. N. Nishioka; P. J. Bunnell

    2000-09-01

    Treatment of sodium-bearing waste (SBW) at the Idaho Nuclear Technology and Engineering Center (INTEC) within the Idaho National Engineering and Environmental Laboratory is mandated under a Settlement Agreement between the Department of Energy and the State of Idaho. One of the requirements of the Settlement Agreement is the complete calcination (i.e., treatment) of all SBW by December 31, 2012. One of the proposed options for treatment of SBW is vitrification. This study will examine the viability of SBW vitrification. This study describes the process and facilities to treat the SBW, from beginning waste input from INTEC Tank Farm to the final waste forms. Schedules and cost estimates for construction and operation of a Vitrification Facility are included. The study includes a facility layout with drawings, process description and flow diagrams, and preliminary equipment requirements and layouts.

  7. Feasibility studies of waterflooding gas-condensate reservoirs

    SciTech Connect (OSTI)

    Matthews, J.D.; Howes, R.I.; Hawkyard, I.R.; Fishlock, T.P.

    1988-08-01

    Preliminary results obtained from a program of experimental and theoretical studies examining the uncertainties of waterflooding gas-condensate reservoirs are reported. In spite of high trapped-gas saturations (35 to 39%), further aggravated by an unusual type of hysteresis, recoveries of gas and liquids can be increased over those obtained under natural depletion.

  8. Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants

    SciTech Connect (OSTI)

    Stephen Schey

    2009-07-01

    Cooperative Agreement DE-FC07-06ID14788 was executed between the U.S. Department of Energy, Electric Transportation Applications, and Idaho National Laboratory to investigate the economics of producing hydrogen by electrolysis using electricity generated by nuclear power. The work under this agreement is divided into the following four tasks: Task 1 – Produce Data and Analyses Task 2 – Economic Analysis of Large-Scale Alkaline Electrolysis Task 3 – Commercial-Scale Hydrogen Production Task 4 – Disseminate Data and Analyses. Reports exist on the prospect that utility companies may benefit from having the option to produce electricity or produce hydrogen, depending on market conditions for both. This study advances that discussion in the affirmative by providing data and suggesting further areas of study. While some reports have identified issues related to licensing hydrogen plants with nuclear plants, this study provides more specifics and could be a resource guide for further study and clarifications. At the same time, this report identifies other area of risks and uncertainties associated with hydrogen production on this scale. Suggestions for further study in some of these topics, including water availability, are included in the report. The goals and objectives of the original project description have been met. Lack of industry design for proton exchange membrane electrolysis hydrogen production facilities of this magnitude was a roadblock for a significant period. However, recent design breakthroughs have made costing this facility much more accurate. In fact, the new design information on proton exchange membrane electrolyzers scaled to the 1 kg of hydrogen per second electrolyzer reduced the model costs from $500 to $100 million. Task 1 was delayed when the original electrolyzer failed at the end of its economic life. However, additional valuable information was obtained when the new electrolyzer was installed. Products developed during this study include a process model and a N2H2 economic assessment model (both developed by the Idaho National Laboratory). Both models are described in this report. The N2H2 model closely tracked and provided similar results as the H2A model and was instrumental in assessing the effects of plant availability on price when operated in the shoulder mode for electrical pricing. Differences between the H2A and N2H2 model are included in this report.

  9. FEASIBILITY STUDY II OF A MUON BASED NEUTRINO SOURCE.

    SciTech Connect (OSTI)

    GALLARDO,J.C.; OZAKI,S.; PALMER,R.B.; ZISMAN,M.

    2001-06-30

    The concept of using a muon storage ring to provide a well characterized beam of muon and electron neutrinos (a Neutrino Factory) has been under study for a number of years now at various laboratories throughout the world. The physics program of a Neutrino Factoryis focused on the relatively unexplored neutrino sector. In conjunction with a detector located a suitable distance from the neutrino source, the facility would make valuable contributions to the study of neutrino masses and lepton mixing. A Neutrino Factory is expected to improve the measurement accuracy of sin{sup 2}(2{theta}{sub 23}) and {Delta}m{sup 2}{sub 32} and provide measurements of sin{sup 2}(2{theta}{sub 13}) and the sign of {Delta}m{sup 2}{sub 32}. It may also be able to measure CP violation in the lepton sector.

  10. Wind & Hydro Energy Feasiblity Study for the Yurok Tribe

    Energy Savers [EERE]

    Study for the Yurok Tribe DOE Tribal Energy Program Review Meeting Award #DE-FG36-07GO17078 November 19, 2009 Presented By: Austin Nova, Yurok Tribe Background/Location Yurok Reservation Straddles the lower stem of the Klamath River, 2 miles wide and 44 miles long) Located in northwest corner of California Background * Largest Indian Tribe in California * Traditional livelihood on the Yurok Reservation is based upon subsistence harvest of salmon on the Klamath River Background A large portion of

  11. Feasibility Study: Ductless Hydronic Distribution Systems with Fan Coil Delivery

    SciTech Connect (OSTI)

    Springer, D.; Dakin, B.; Backman, C.

    2012-07-01

    The primary objectives of this study are to estimate potential energy savings relative to conventional ducted air distribution, and to identify equipment requirements, costs, and barriers with a focus on ductless hydronic delivery systems that utilize water-to-air terminal units in each zone. Results indicate that annual heating and cooling energy use can be reduced by up to 27% assuming replacement of the conventional 13 SEER heat pump and coil with a similarly rated air-to-water heat pump.

  12. Hanford Waste Vitrification Plant foreign alternatives feasibility study

    SciTech Connect (OSTI)

    Not Available

    1990-05-01

    The impacts and uncertainties of changing from the current Hanford Waste Vitrification Plant technology and plant design based on the liquid-fed ceramic melter to the French Ateliers Vitrification La Hague vitrification technology and plant design for vitrifying high-level defense wastes are considered in this report. An evaluation has been made as to whether the change might be a source of significant cost savings. The French Ateliers Vitrification La Hague technology is the only alternative at a sufficiently advanced stage of development to consider as a replacement for the current Hanford Waste Vitrification Plant technology. This study concludes that a significant cost savings could not be realized by changing to the French Ateliers Vitrification La Hague technology and design for the Hanford Waste Vitrification Plant. The study provides a rough comparison of plant costs based on available information. An improved cost estimate could be developed through more detailed study, but it would be unlikely to change the overall conclusion. 7 figs., 3 tabs.

  13. White phosphorus pits focused feasibility study final July 2007.

    SciTech Connect (OSTI)

    Davis, B.; Martino, L.

    2007-08-21

    The White Phosphorus Burning Pits (WPP) Area of Concern (AOC) is a site of about 5.5 acres (2.2 ha) located in the J-Field Study Area, in the Edgewood Area of Aberdeen Proving Ground (APG), Maryland (Figure 1.1). Considerable information about the WPP exists as a result of efforts to characterize the hazards associated with J-Field. Contamination in the J-Field Study Area was first detected during an environmental survey of the APG Edgewood Area conducted in 1977 and 1978 (Nemeth et al. 1983) by the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA; predecessor to the U.S. Army Environmental Center). As part of a subsequent USATHAMA environmental survey, 11 wells were installed and sampled at J-Field (three of them at the WPP) (Nemeth 1989). Contamination was also detected in 1983 during a munitions disposal survey conducted by Princeton Aqua Science (1984). The Princeton Aqua Science investigation involved installing and sampling nine wells (four at the WPP) and collecting and analyzing surficial and deep composite soil samples (including samples from the WPP area). In 1986, the U.S. Environmental Protection Agency (EPA) issued a Resource Conservation and Recovery Act (RCRA) Permit (MD3-21-002-1355) requiring a post-wide RCRA Facility Assessment (RFA) and a hydrogeologic assessment of J-Field. In 1987, the U.S. Geological Survey (USGS) began a two-phase hydrogeologic assessment in which data were collected to model groundwater flow at J-Field. Soil-gas investigations were conducted, several well clusters were installed (four at the WPP), a groundwater flow model was developed, and groundwater and surface water monitoring programs were established that continue today. The results of the USGS study were published by Hughes (1993).

  14. Solar Feasibility Study May 2013 - San Carlos Apache Tribe

    SciTech Connect (OSTI)

    Rapp, Jim; Duncan, Ken; Albert, Steve

    2013-05-01

    The San Carlos Apache Tribe (Tribe) in the interests of strengthening tribal sovereignty, becoming more energy self-sufficient, and providing improved services and economic opportunities to tribal members and San Carlos Apache Reservation (Reservation) residents and businesses, has explored a variety of options for renewable energy development. The development of renewable energy technologies and generation is consistent with the Tribe’s 2011 Strategic Plan. This Study assessed the possibilities for both commercial-scale and community-scale solar development within the southwestern portions of the Reservation around the communities of San Carlos, Peridot, and Cutter, and in the southeastern Reservation around the community of Bylas. Based on the lack of any commercial-scale electric power transmission between the Reservation and the regional transmission grid, Phase 2 of this Study greatly expanded consideration of community-scale options. Three smaller sites (Point of Pines, Dudleyville/Winkleman, and Seneca Lake) were also evaluated for community-scale solar potential. Three building complexes were identified within the Reservation where the development of site-specific facility-scale solar power would be the most beneficial and cost-effective: Apache Gold Casino/Resort, Tribal College/Skill Center, and the Dudleyville (Winkleman) Casino.

  15. A Feasibility Study of an e e- Ring Collider for Higgs Factory (Journal

    Office of Scientific and Technical Information (OSTI)

    Article) | SciTech Connect A Feasibility Study of an e e- Ring Collider for Higgs Factory Citation Details In-Document Search Title: A Feasibility Study of an e e- Ring Collider for Higgs Factory Authors: Cai, Yunhai ; Chao, Alex ; Nosochkov, Yuri ; Wienands, Uli ; Zimmermann, Frank ; /SLAC Publication Date: 2013-04-22 OSTI Identifier: 1074169 Report Number(s): SLAC-PUB-15416 DOE Contract Number: AC02-76SF00515 Resource Type: Journal Article Resource Relation: Journal Name: Submitted to

  16. Feasibility study on AFR-100 fuel conversion from uranium-based fuel to

    Office of Scientific and Technical Information (OSTI)

    thorium-based fuel (Technical Report) | SciTech Connect Feasibility study on AFR-100 fuel conversion from uranium-based fuel to thorium-based fuel Citation Details In-Document Search Title: Feasibility study on AFR-100 fuel conversion from uranium-based fuel to thorium-based fuel Although thorium has long been considered as an alternative to uranium-based fuels, most of the reactors built to-date have been fueled with uranium-based fuel with the exception of a few reactors. The decision to

  17. Desk study of production energy savings control systems feasibility study. (Russia). Volume 1. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1992-07-17

    The objective of the feasibility study is to determine the marketability of heating/ventilating energy conserving control systems in the major city markets of eastern Russia. The second part of the objective is to determine if the existing military based Zelenograd micro-electronic manufacturing and research facility can be utilized to produce Direct Digital Control systems for use within Russia as well as for export to the European Economic Community (EEC) and other countries. Because significant exports of U.S. products and services to support the joint venture are questionable, it is suggested that, potential markets for U.S. products be identified. Sources of capital to finance the joint venture should be identified.

  18. Feasibility study of enhanced oil recovery for fields in decline. Export trade information (Final)

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    The report, generated by Scientific Software-Intercomp, Inc. for Yacimientos Petroliferos Fiscales Bolivianos, documents the results of a feasibility study which addressed the viability of developing petroleum areas in Bolivia. The primary objective of the project was to describe the reservoirs that have been discovered and their reserves, describe which would be the best alternatives for development of these reservoirs, and to determine the best alternatives for development of all the reserves together. The report, volume 4 of 4, concerns the feasibility of enhancing the oil or condensate recovery from a chosen group of fields (Yapacani, Humberto Suarez Roca, Vibora, La Pena, San Roque, and Camiri).

  19. Geothermal Direct Use Feasibility Study on the Fort Bidwell Indian Reservation

    SciTech Connect (OSTI)

    Dale Merrick

    2007-04-20

    The Fort Bidwell Indian Reservation (FBIR) is rich in renewable energy resources. Development of its geothermal resources has the potential to profoundly affect the energy and economic future of the FBIC. Geothermal energy can contribute to making the reservation energy self-sufficient and, potentially, an energy exporter. The feasibility study assessed the feasibility of installing a geothermal district heating system to provide low-cost, efficient heating of existing and planned residences, community buildings and water, using an existing geothermal well, FB-3.

  20. Waste Management Plan for the Oak Ridge National Remedial Investigation/Feasibility Study

    SciTech Connect (OSTI)

    Not Available

    1988-04-01

    In accordance with the requirements of the Remedial Investigation/Feasibility Study (RI/FS) Project Quality Assurance Plan, this Waste Management Plan establishes clear lines of responsibility and authority, documentation requirements, and operational guidance for the collection, identification, segregation, classification, packaging, certification, and storage/disposal of wastes. These subjects are discussed in the subsequent sections of this document.

  1. Cle Elum Lake Anadromous Salmon Restoration Feasibility Study: Summary of Research, 1986-1999 Progress Report.

    SciTech Connect (OSTI)

    Dey, Douglas

    2000-04-01

    The focus of this research was to study the feasibility for anadromous salmonids to recolonize the habitat above reservoirs in the Yakima River without disruption to irrigation withdrawals. A primary concern was whether anadromous fish could successfully exit reservoirs and survive downstream passage through the Yakima and Columbia Rivers to the ocean.

  2. ToHajiilee Economic Development, Inc.(TEDI) Feasibility Study for Utility-Scale Solar

    SciTech Connect (OSTI)

    Burpo, Rob

    2012-02-29

    To??Hajiilee Economic Development, Inc. (TEDI) is the economic development entity representing the ToHajiilee Chapter of the Navajo Nation, also known as the Ca??oncito Band of Navajo (CBN). Using DOE funding, TEDI assembled a team of qualified advisors to conduct a feasibility study for a utility-scale 30 MW Photovoltaic (PV) solar power generation facility on TEDI trust lands. The goal for this project has been to gather information and practical business commitments to successfully complete the feasibility analysis. The TEDI approach was to successively make informed decisions to select an appropriate technology best suited to the site, determine environmental viability of the site, secure options for the sale of generated power, determine practicality of transmission and interconnection of power to the local grid, and secure preliminary commitments on project financing. The feasibility study has been completed and provides TEDI with a practical understanding of its business options in moving forward with developing a solar project on CBN tribal lands. Funding from DOE has allowed TEDI and its team of professional advisors to carefully select technology and business partners and build a business model to develop this utility-scale solar project. As a result of the positive feasibility findings, TEDI is moving forward with finalizing all pre-construction activities for its major renewable energy project.

  3. Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings: Appendices

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is the appendices to the Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings document.

  4. Solar feasibility study for site-specific industrial-process-heat applications. Final report

    SciTech Connect (OSTI)

    Murray, O.L.

    1980-03-18

    This study addresses the technical feasibility of solar energy in industrial process heat (IPH) applications in Mid-America. The study was one of two contracted efforts covering the MASEC 12-state region comprised of: Illinois, Michigan, North Dakota, Indiana, Minnesota, Ohio, Iowa, Missouri, South Dakota, Kansas, Nebraska, Wisconsin. The results of our study are encouraging to the potential future role of solar energy in supplying process heat to a varied range of industries and applications. We identified and developed Case Study documentation of twenty feasible solar IPH applications covering eight major SIC groups within the Mid-American region. The geographical distribution of these applications for the existing range of solar insolation levels are shown and the characteristics of the applications are summarized. The results of the study include process identification, analysis of process heat requirements, selection of preliminary solar system characteristics, and estimation of system performance and cost. These are included in each of the 20 Case Studies. The body of the report is divided into two primary discussion sections dealing with the Study Methodology employed in the effort and the Follow-On Potential of the identified applications with regard to possible demonstration projects. The 20 applications are rated with respect to their relative overall viability and procedures are discussed for possible demonstration project embarkment. Also, a possible extension of this present feasibility study for late-comer industrial firms expressing interest appears worthy of consideration.

  5. Feasibility study: utilization of landfill gas for a vehicle fuel system, Rossman's landfill, Clackamas County, Oregon

    SciTech Connect (OSTI)

    1981-01-01

    In 1978, a landfill operator in Oregon became interested in the technical and economic feasibility of recovering the methane generated in the landfill for the refueling of vehicles. DOE awarded a grant for a site-specific feasibility study of this concept. This study investigated the expected methane yield and the development of a conceptual gas-gathering system; gas processing, compressing, and storage systems; and methane-fueled vehicle systems. Cost estimates were made for each area of study. The results of the study are presented. Reasoning that gasoline prices will continue to rise and that approximately 18,000 vehicles in the US have been converted to operate on methane, a project is proposed to use this landfill as a demonstration site to produce and process methane and to fuel a fleet (50 to 400) vehicles with the gas produced in order to obtain performance and economic data on the systems used from gas collection through vehicle operation. (LCL)

  6. Feasibility study for thermal treatment of solid tire wastes in Bangladesh by using pyrolysis technology

    SciTech Connect (OSTI)

    Islam, M.R.; Joardder, M.U.H.; Hasan, S.M.; Takai, K.; Haniu, H.

    2011-09-15

    In this study on the basis of lab data and available resources in Bangladesh, feasibility study has been carried out for pyrolysis process converting solid tire wastes into pyrolysis oils, solid char and gases. The process considered for detailed analysis was fixed-bed fire-tube heating pyrolysis reactor system. The comparative techno-economic assessment was carried out in US$ for three different sizes plants: medium commercial scale (144 tons/day), small commercial scale (36 tons/day), pilot scale (3.6 tons/day). The assessment showed that medium commercial scale plant was economically feasible, with the lowest unit production cost than small commercial and pilot scale plants for the production of crude pyrolysis oil that could be used as boiler fuel oil and for the production of upgraded liquid-products.

  7. Grand Traverse Band of Ottawa and Chippewa Indians - Renewable Energy Feasibility Study

    Energy Savers [EERE]

    Renewable Energy & Energy Efficiency Feasibility Study DOE Tribal Energy Program Review Denver, Colorado November 14 - 20, 2008 November 2008 Grand Traverse Band * 3,988 Members * 2,370 Acres - Checkerboard * Six-County Service Area * EDC: 2 Casinos, Resort Hotels (600 Rooms), Gas Station, etc. * Gov't: Administration, Housing, Medicine Lodge, Strong Heart Center, Day Care, etc. Grand Traverse Resort and Spa Turtle Creek Casino Hotel (June 08) GTB Energy Vision & Plan Three Focus Areas:

  8. Inter-Tribal Council of Michigan, Inc. - Bay Mills Indian Community Energy Reduction Feasibility Study

    Energy Savers [EERE]

    --Tribal Council of Michigan, Inc. Environmental Services Division Bay Mills Indian Community Energy Reduc<on Feasibility Study Chris K ushman Thank You *DOE Tribal Energy Program *Tribal Energy Program Review presenters *Bay Mills Indian Community Bay Mills Indian Community * Upper Peninsula of Michigan - Cold temperatures - Prolonged exposure to strong north winds off Lake Superior - Short winter daylight * Fishing and fish consuming community * Electricity largely supplied by coal fired

  9. San Carlos Apache Tribe Energy Organization Analysis & Solar Feasibility Study

    Energy Savers [EERE]

    Energy Organization Analysis & Solar Feasibility Study 2012 funded by grants from the US Department of Energy Tribal Energy Program . San Carlos Apache Mission Statement The Apache People will live a balanced life in harmony with spirituality, culture, language, and family unity in an ever-changing world and shall create a strategic framework for our tribe to grow and prosper. Reservation Boundary The Tribe and Reservation * 90 miles from Phoenix. * 2,400' to 8,300' elevation. * 1.83

  10. Stockbridge-Munsee Health & Wellness Center and Family Center Renewable Energy Feasibility Study

    Energy Savers [EERE]

    Stockbridge-Munsee Health & Wellness Center & Family Center Renewable Energy Feasibility Study. Stockbridge-Munsee Tribal Overview * A Band of Mohican Indians * From the Algonquin language group of Tribes. Papscanee Village Site Painting follows archeological reports & accurately depicts pre European village. Tribal History * The tribe lived along the Muh-he-con-ne-ok River, "where the waters are never still". (now the Hudson River) * The Stockbridge name came from the town

  11. Contract administration involving the remedial investigation and feasibility study at the Feed Materials Production Center

    SciTech Connect (OSTI)

    Not Available

    1991-08-28

    Advanced Sciences, Incorporated (ASI), has been performing a Remedial Investigation and Feasibility Study (RI/FS) at the Feed Materials Production Center (Fernald Facility) at Fernald, Ohio, under an 8 (a) contract with the US Small Business Administration (SBA). The Fernald Facility is a Government-owned facility operated by Westinghouse Materials Company of Ohio (WMCO) under a management and operating contract. The objective of this audit was to evaluate the award and administration of the ASI contract.

  12. Red Lake Band of Chippewa Indians: Biomass Energy Feasiblity Study Update

    Energy Savers [EERE]

    Health and Bioenergy: Technology Opportunities and Barriers Scott Haase McNeil Technologies June 20, 2003 Red Lake Band of Chippewa Indians: Biomass Energy Feasibility Study Update Presented to DOE Tribal Energy Program Scott Haase October 19, 2004 * Project overview * Resource assessment * Assess on-site electric and thermal applications * Assess local/regional utility market * Economic analysis * Alternative products Presentation Outline * Evaluate and determine potential options for creating

  13. Final Report: Energy Efficiency and Feasibility Study and Resulting Plan for the Bay Mills Indian Community

    Energy Savers [EERE]

    Report Energy Efficiency Feasibility Study and Resulting Plan for the Bay Mills Indian Community U.S. Department of Energy Tribal Energy Program Award # DE-EE0005173 Project Officer: Lizana K. Pierce lizana.pierce@go.doe.gov Prepared by: Inter-Tribal Council of Michigan, Inc. Environmental Services Division Sault Ste. Marie, MI 49783 Technical Contact: Chris Kushman ckushman@itcmi.org March 2014 1 Executive Summary In 2011 the Inter-Tribal Council of Michigan, Inc. was awarded an Energy

  14. Stockbridge-Munsee Health & Wellness Center and Family Center Renewable Energy Feasibility Study

    Office of Environmental Management (EM)

    Stockbridge-Munsee Health & Wellness Center & Family Center Renewable Energy Feasibility Study. Stockbridge-Munsee Tribal Overview * A Band of Mohican Indians * From the Algonquin language group of Tribes. Papscanee Village Site Painting follows archeological reports & accurately depicts pre European village. Tribal History * The tribe lived along the Muh-he-con-ne-ok River, "where the waters are never still". (now the Hudson River) * The Stockbridge name came from the town

  15. A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation

    SciTech Connect (OSTI)

    Terry Battiest

    2012-11-30

    The project, A Feasibility Study to Evaluate Wind Energy Potential on the Navajo Nation, is funded under a solicitation issued by the U.S. Department of Energy Tribal Energy Program. Funding provided by the grant allowed the Navajo Nation to measure wind potential at two sites, one located within the boundaries of the Navajo Nation and the other off-reservation during the project period (September 5, 2005 - September 30, 2009). The recipient for the grant award is the Navajo Tribal Utility Authority (NTUA). The grant allowed the Navajo Nation and NTUA manage the wind feasibility from initial site selection through the decision-making process to commit to a site for wind generation development. The grant activities help to develop human capacity at NTUA and help NTUA to engage in renewable energy generation activities, including not only wind but also solar and biomass. The final report also includes information about development activities regarding the sited included in the grant-funded feasibility study.

  16. Public summaries of feasibility studies conducted for the trinidad LNG project. Export trade information

    SciTech Connect (OSTI)

    1995-04-01

    The study, conducted by The M. W. Kellog Company, was funded by the U.S. Trade and Development Agency on behalf of the National Gas Company of Trinidad and Tobago. It shows the results of Project Definition Phase which was implemented as a follow-up to two previous feasibility studies which were conducted for a LNG plant in Trinidad. The objective of this report is to develop a project design basis and implementation plan plus a cost estimate. The study is divided into the following sections: (1) Introduction; (2) Project Design Basis; (3) Seismic Hazard Assessment; (4) Geotechnical; and (5) Environmental Assessment.

  17. Feasibility study of a corn-to-ethanol plant in Sardis, Mississippi

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    A feasibility study for a corn-to-ethanol plant in Panola County, Mississippi was carried out. This area is well suited for the production of ethanol from corn, as it has a mild climate, a plentiful supply of wood fuel, and a well-developed agricultural infrastructure. The project was designed for 5 million gallons per year, using the ACR Process, a process proven in 6 plants now operating. It was determined to be technically feasible for this size. However, without a state financial incentive such as a gasoline excise tax or sales tax exemption, the plant is not economically feasible in Mississippi. Even though a 4 cents per gallon federal excise tax exemption will likely remain, the economics without any other incentive are not strong enough to obtain financing or equity funds. While the Mississippi legislature decided not to consider a financial incentive in their 1982 session, an attempt will be made to introduce a proposal for a suitable exemption during the 1983 legislative session. Until then, the project is on hold.

  18. Energy Efficiency in Separate Tenant Spaces … A Feasibility Study, EXECUTIVE SUMMARY

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Study E X E C U T I V E S U M M A R Y Energy Efficiency in Separate Tenant Spaces - A Feasibility Study 1 Executive Summary Commercial buildings account for 20% of energy used in the United States economy, 1 with leased spaces representing approximately 50% of all commercial building energy use. 2 Increasingly, market pressures such as rising energy costs, new requirements to publicly disclose energy usage, and increased attention on energy efficiency as a means to combat climate change are

  19. Feasibility Study of Solar Photovoltaics on Landfills in Puerto Rico (Second Study)

    SciTech Connect (OSTI)

    Salasovich, J.; Mosey, G.

    2011-08-01

    This report presents the results of an assessment of the technical and economic feasibility of deploying a solar photovoltaics (PV) system on landfill sites in Puerto Rico. The purpose of this report is to assess the landfills with the highest potential for possible solar PV installation and estimate cost, performance, and site impacts of three different PV options: crystalline silicon (fixed tilt), crystalline silicon (single-axis tracking), and thin film (fixed tilt). The report outlines financing options that could assist in the implementation of a system. According to the site production calculations, the most cost-effective system in terms of return on investment is the thin-film fixed-tilt technology. The report recommends financing options that could assist in the implementation of such a system. The landfills and sites considered in this report were all determined feasible areas in which to implement solar PV systems.

  20. A New Process for Hot Metal Production at Low Fuel Rate - Phase 1 Feasibility Study

    SciTech Connect (OSTI)

    Dr. Wei-Kao Lu

    2006-02-01

    The project is part of the continuing effort by the North American steel industry to develop a coal-based, cokeless process for hot metal production. The objective of Phase 1 is to determine the feasibility of designing and constructing a pilot scale facility with the capacity of 42,000 mtpy of direct reduced iron (DRI) with 95% metallization. The primary effort is performed by Bricmont, Inc., an international engineering firm, under the supervision of McMaster University. The study focused on the Paired Straight Hearth furnace concept developed previously by McMaster University, The American Iron and Steel Institute and the US Department of Energy.

  1. Continuous On-Line Partial Discharge Monitor for Medium-Voltage Cable Feasibility Study

    SciTech Connect (OSTI)

    M. Fenger

    2005-11-30

    Partial discharge (PD) assessment is one method of detecting cable conditions that predict approaching failure. While not all PDs in cable systems lead to failure, PDs within the cable's insulation can lead to relatively rapid failure. Accordingly, on-line PD assessment may be more useful than periodic PD assessment because the period of partial discharging at the end of a cable's life may be quite short. The research described in this report studied the feasibility of developing an on-line PD monitor for assessing both shielded and unshielded MV cables.

  2. Remedidal investigation and feasibility study report for the Environmental Restoration Disposal Facility

    SciTech Connect (OSTI)

    Roeck, F.V.

    1994-06-01

    The purpose of the remedial investigation (RI) is to collect data necessary to adequately characterize the site for the purpose of developing and evaluating effective remedial alternatives. To characterize the site, the lead agency shall, as appropriate, conduct field investigations, including treatability studies, and conduct a baseline risk assessment. The RI provides information to assess the risks to human health and the environment and to support the development, evaluation, and selection of appropriate response alternatives. The primary objective of the feasibility study (FS) is to ensure that appropriate remedial alternatives are developed and evaluated such that relevant information concerning the remedial action options can be presented to a decision-maker and an appropriate remedy selected. The lead agency may develop a feasibility study to address a specific site problem or the entire site. The development and evaluation of alternatives shall reflect the scope and complexity of the remedial action under consideration and the site problems being addressed. Development of alternatives shall be fully integrated with the site characterization activities of the remedial investigation described in paragraph (d) of this section. The lead agency shall include an alternatives screening step, when needed, to select a reasonable number of alternatives for detailed analysis.

  3. Remedial Investigation/Feasibility Study (RI/FS) process, elements and techniques guidance

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    This manual provides detailed guidance on Remedial Investigation/Feasibility Studies (RI/FSs) conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at Department of Energy (DOE) facilities. The purpose of the RI/FS, to assess the risk posed by a hazardous waste site and to determine the best way to reduce that risk, and its structure (site characterization, risk assessment, screening and detailed analysis of alternatives, etc.) is defined in the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) and further explained in the Environmental Protection Agency`s (EPA`s) Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (Interim Final) 540/G-89/004, OSWER Directive 9355.3-01, October 1988. Though issued in 1988, the EPA guidance remains an excellent source of information on the conduct and structure of an RI/FS. This document makes use of supplemental RI/FS-related guidance that EPA has developed since its initial document was issued in 1988, incorporates practical lessons learned in more than 12 years of experience in CERCLA hazardous site remediation, and drawing on those lessons, introduces the Streamlined Approach For Environmental Restoration (SAFER), developed by DOE as a way to proceed quickly and efficiently through the RI/FS process at DOE facilities. Thus as its title implies, this guidance is intended to describe in detail the process and component elements of an RI/FS, as well as techniques to manage the RI/FS effectively.

  4. Final Progress Report: Isotope Identification Algorithm for Rapid and Accurate Determination of Radioisotopes Feasibility Study

    SciTech Connect (OSTI)

    Rawool-Sullivan, Mohini; Bounds, John Alan; Brumby, Steven P.; Prasad, Lakshman; Sullivan, John P.

    2012-04-30

    This is the final report of the project titled, 'Isotope Identification Algorithm for Rapid and Accurate Determination of Radioisotopes,' PMIS project number LA10-HUMANID-PD03. The goal of the work was to demonstrate principles of emulating a human analysis approach towards the data collected using radiation isotope identification devices (RIIDs). It summarizes work performed over the FY10 time period. The goal of the work was to demonstrate principles of emulating a human analysis approach towards the data collected using radiation isotope identification devices (RIIDs). Human analysts begin analyzing a spectrum based on features in the spectrum - lines and shapes that are present in a given spectrum. The proposed work was to carry out a feasibility study that will pick out all gamma ray peaks and other features such as Compton edges, bremsstrahlung, presence/absence of shielding and presence of neutrons and escape peaks. Ultimately success of this feasibility study will allow us to collectively explain identified features and form a realistic scenario that produced a given spectrum in the future. We wanted to develop and demonstrate machine learning algorithms that will qualitatively enhance the automated identification capabilities of portable radiological sensors that are currently being used in the field.

  5. Feasibility study on the verification of fresh fuel assemblies in shipping containers

    SciTech Connect (OSTI)

    Swinth, K.L.; Tanner, J.E.

    1990-09-01

    The purpose of this study was to examine the feasibility of using various nondestructive measurement techniques to determine the presence of fuel assemblies inside shipping containers and to examine the feasibility of measuring the fissile content of the containers. Passive and active techniques based on both gamma and neutron assay were examined. In addition, some experiments and calculations were performed to evaluate neutron techniques. Passive counting of the 186 keV gamma from {sup 235}U is recommended for use as an attributes measurement technique. Experiments and studies indicated that a bismuth germanate (BGO) scintillator is the preferred detector. A properly designed system based on this detector will provide a compact detector that can selectively verify fuel assemblies within a shipping container while the container is in a stack of similarly loaded containers. Missing fuel assemblies will be readily detected, but gamma counting of assemblies cannot detect changes in the fissile content of the inner rods in an assembly. If a variables technique is required, it is recommended that more extensive calculations be performed and removal of the outer shipping container be considered. Marking (sealing) of the assemblies with a uniquely identifiable transponder was also considered. This would require the development of procedures that would assure proper application and removal of the seal. When change to a metal outer container occurs, the technique will no longer be useful unless a radiolucent window is included in the container. 20 refs., 7 figs., 2 tabs.

  6. FEASIBILITY STUDY FOR A PETROLEUM REFINERY FOR THE JICARILLA APACHE TRIBE

    SciTech Connect (OSTI)

    John D. Jones

    2004-10-01

    A feasibility study for a proposed petroleum refinery for the Jicarilla Apache Indian Reservation was performed. The available crude oil production was identified and characterized. There is 6,000 barrels per day of crude oil production available for processing in the proposed refinery. The proposed refinery will utilize a lower temperature, smaller crude fractionation unit. It will have a Naphtha Hydrodesulfurizer and Reformer to produce high octane gasoline. The surplus hydrogen from the reformer will be used in a specialized hydrocracker to convert the heavier crude oil fractions to ultra low sulfur gasoline and diesel fuel products. The proposed refinery will produce gasoline, jet fuel, diesel fuel, and a minimal amount of lube oil. The refinery will require about $86,700,000 to construct. It will have net annual pre-tax profit of about $17,000,000. The estimated return on investment is 20%. The feasibility is positive subject to confirmation of long term crude supply. The study also identified procedures for evaluating processing options as a means for American Indian Tribes and Native American Corporations to maximize the value of their crude oil production.

  7. Adverse reproductive outcomes in families of atomic veterans: The feasibility of epidemiologic studies

    SciTech Connect (OSTI)

    1995-12-31

    This is an outstanding report from a distinguished academy committee, which in 71 pages of text provides the scientific basis for the carefully crafted 8-page executive summary. The principles and issues of the required epidemiological study are presented calmly and concisely, as are the ensuing short chapters on radiation biology, genetics and risk estimation, and all other adverse reproductive outcomes. The committee was mandated by Congress to determine the feasibility, cost and duration of a study on adverse reproductive outcomes in families of atomic veteran. The committee found that a scientifically adequate and epidemiologically valid study could not be mounted and the cost would be tens of millions of dollars lasting a decade. The Committee presents a number of well-discussed approaches in support of their position.

  8. Remedial investigation/feasibility study report for Lower Watts Bar Reservoir Operable Unit

    SciTech Connect (OSTI)

    1995-03-01

    This document is the combined Remedial Investigation and Feasibility Study Report for the lower Watts Bar Reservoir (LWBR) Operable Unit (OU). The LWBR is located in Roane, Rhea, and Meigs counties, Tennessee, and consists of Watts Bar Reservoir downstream of the Clinch river. This area has received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). As required by this law, the ORR and all off-site areas that have received contaminants, including LWBR, must be investigated to determine the risk to human health and the environment resulting from these releases, the need for any remedial action to reduce these risks, and the remedial actions that are most feasible for implementation in this OU. Contaminants from the ORR are primarily transported to the LWBR via the Clinch River. There is little data regarding the quantities of most contaminants potentially released from the ORR to the Clinch River, particularly for the early years of ORR operations. Estimates of the quantities released during this period are available for most radionuclides and some inorganic contaminants, indicating that releases 30 to 50 years ago were much higher than today. Since the early 1970s, the release of potential contaminants has been monitored for compliance with environmental law and reported in the annual environmental monitoring reports for the ORR.

  9. Feasibility Study of Economics and Performance of Solar Photovoltaics at Johnson County Landfill

    SciTech Connect (OSTI)

    Salasovich, J.; Mosey, G.

    2012-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Johnson County Landfill in Shawnee, Kansas, for a feasibility study of renewable energy production. Citizens of Shawnee, city planners, and site managers are interested in redevelopment uses for landfills in Kansas that are particularly well suited for grid-tied solar photovoltaic (PV) installation. This report assesses the Johnson County Landfill for possible grid-tied PV installations and estimates the cost, performance, and site impacts of three different PV options: crystalline silicon (fixed tilt), crystalline silicon (single-axis tracking), and thin film (fixed tilt). Each option represents a standalone system that can be sized to use an entire available site area. In addition, the report outlines financing options that could assist in the implementation of a system. The feasibility of PV systems installed on landfills is highly impacted by the available area for an array, solar resource, operating status, landfill cap status, distance to transmission lines, and distance to major roads. The report findings are applicable to other landfills in the surrounding area.

  10. Alaska coal gasification feasibility studies - Healy coal-to-liquids plant

    SciTech Connect (OSTI)

    Lawrence Van Bibber; Charles Thomas; Robert Chaney

    2007-07-15

    The Alaska Coal Gasification Feasibility Study entailed a two-phase analysis of the prospects for greater use of Alaska's abundant coal resources in industrial applications. Phase 1, Beluga Coal Gasification Feasibility Study (Report DOE/NETL 2006/1248) assessed the feasibility of using gasification technology to convert the Agrium fertilizer plant in Nikiski, Alaska, from natural gas to coal feedstock. The Phase 1 analysis evaluated coals from the Beluga field near Anchorage and from the Usibelli Coal Mine near Healy, both of which are low in sulfur and high in moisture. This study expands the results of Phase 1 by evaluating a similar sized gasification facility at the Usibelli Coal mine to supply Fischer-Tropsch (F-T) liquids to central Alaska. The plant considered in this study is small (14,640 barrels per day, bbl/d) compared to the recommended commercial size of 50,000 bbl/d for coal-to-liquid plants. The coal supply requirements for the Phase 1 analysis, four million tons per year, were assumed for the Phase 2 analysis to match the probable capacity of the Usibelli mining operations. Alaska refineries are of sufficient size to use all of the product, eliminating the need for F-T exports out of the state. The plant could produce marketable by-products such as sulfur as well as electric power. Slag would be used as backfill at the mine site and CO{sub 2} could be vented, captured or used for enhanced coalbed methane recovery. The unexpected curtailment of oil production from Prudhoe Bay in August 2006 highlighted the dependency of Alaskan refineries (with the exception of the Tesoro facility in Nikiski) on Alaska North Slope (ANS) crude. If the flow of oil from the North Slope declines, these refineries may not be able to meet the in-state needs for diesel, gasoline, and jet fuel. Additional reliable sources of essential fuel products would be beneficial. 36 refs., 14 figs., 29 tabs., 3 apps.

  11. Agua Caliente Solar Feasibility and Pre-Development Study Final Report

    SciTech Connect (OSTI)

    Carolyn T. Stewart, Managing Partner; Red Mountain Energy Partners

    2011-04-26

    Evaluation of facility- and commercial-scale solar energy projects on the Agua Caliente Band of Cahuilla Indians Reservation in Palm Springs, CA. The Agua Caliente Band of Cahuilla Indians (ACBCI) conducted a feasibility and pre-development study of potential solar projects on its lands in southern California. As described below, this study as a logical and necessary next step for ACBCI. Support for solar project development in California, provided through the statewide California Solar Initiative (CSI), its Renewable Portfolio Standard and Feed-in Tariff Program, and recently announced Reverse Auction Mechanism, provide unprecedented support and incentives that can be utilized by customers of California's investor-owned utilities. Department of Energy (DOE) Tribal Energy Program funding allowed ACBCI to complete its next logical step to implement its Strategic Energy Plan, consistent with its energy and sustainability goals.

  12. Feasibility study on nuclear core design for soluble boron free small modular reactor

    SciTech Connect (OSTI)

    Rabir, Mohamad Hairie Hah, Chang Joo; Ju, Cho Sung

    2015-04-29

    A feasibility study on nuclear core design of soluble boron free (SBF) core for small size (150MWth) small modular reactor (SMR) was investigated. The purpose of this study was to design a once through cycle SMR core, where it can be used to supply electricity to a remote isolated area. PWR fuel assembly design with 17×17 arrangement, with 264 fuel rods per assembly was adopted as the basis design. The computer code CASMO-3/MASTER was used for the search of SBF core and fuel assembly analysis for SMR design. A low critical boron concentration (CBC) below 200 ppm core with 4.7 years once through cycle length was achieved using 57 fuel assemblies having 170 cm of active height. Core reactivity controlled using mainly 512 number of 4 wt% and 960 12 wt% Gd rods.

  13. McHuchuma/Katewaka coal fired power plant feasibility study. Final report. Export trade information

    SciTech Connect (OSTI)

    1996-11-22

    This study, conducted by Black and Veatch International, was funded by the U.S. Trade and Development Agency. The report assesses the feasibility for the development of a new coal fueled power plant in Tanzania at the Mchuchuma/Katewaka coal concession area. Volume 3, the Main Report, is divided into the following sections: (1.0) Introduction; (2.0) Power System Development Studies; (3.0) Conceptual Design Summary of the Mchuchuma Coal Fired Power Plant; (4.0) Fuel Supply Evaluation; (5.0) Transmission System Evaluation; (6.0) Power Plant Site and Infrastructure Evaluation; (7.0) Environmental Impact Assessment; (8.0) Institutional Aspects; (9.0) Financial Evaluation and Benefit Analysis; (10.0) Sources of Finance; Appendix (A) Preliminary Design of Mchuchuma Coal Plant.

  14. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  15. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  16. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 1

    SciTech Connect (OSTI)

    1996-10-01

    This remedial investigation (RI)/feasibility study (FS) supports the selection of remedial actions for the David Witherspoon, Inc. 901 Maryville Pike Site in Knoxville, Tennessee. Operations at the site, used as a recycling center, have resulted in past, present, and potential future releases of hazardous substances in to the environment. This Site is a Tennessee Superfund site. A phased approach was planned to (1) gather existing data from previous investigations managed by the Tenn. Dept. of Environment and Conservation; (2) perform a preliminary RI, including risk assessments, and an FS with existing data to identify areas where remedial action may be necessary; (3) gather additional field data to adequately define the nature and extent of risk-based contaminants that present identifiable threats to human and/or ecological receptors; and (4) develop remedial action alternatives to reduce risks to acceptable levels.

  17. A feasibility study of in vivo applications of single beam acoustic tweezers

    SciTech Connect (OSTI)

    Li, Ying Lee, Changyang; Chen, Ruimin; Zhou, Qifa; Shung, K. Kirk

    2014-10-27

    Tools that are capable of manipulating micro-sized objects have been widely used in such fields as physics, chemistry, biology, and medicine. Several devices, including optical tweezers, atomic force microscope, micro-pipette aspirator, and standing surface wave type acoustic tweezers have been studied to satisfy this need. However, none of them has been demonstrated to be suitable for in vivo and clinical studies. Single beam acoustic tweezers (SBAT) is a technology that uses highly focused acoustic beam to trap particles toward the beam focus. Its feasibility was first theoretically and experimentally demonstrated by Lee and Shung several years ago. Since then, much effort has been devoted to improving this technology. At present, the tool is capable of trapping a microparticle as small as 1 μm, as well as a single red blood cell. Although in comparing to other microparticles manipulating technologies, SBAT has advantages of providing stronger trapping force and deeper penetration depth in tissues, and producing less tissue damage, its potential for in vivo applications has yet been explored. It is worth noting that ultrasound has been used as a diagnostic tool for over 50 years and no known major adverse effects have been observed at the diagnostic energy level. This paper reports the results of an initial attempt to assess the feasibility of single beam acoustic tweezers to trap microparticles in vivo inside of a blood vessel. The acoustic intensity of SBAT under the trapping conditions that were utilized was measured. The mechanical index and thermal index at the focus of acoustic beam were found to be 0.48 and 0.044, respectively, which meet the standard of commercial diagnostic ultrasound system.

  18. Energy Efficiency Feasibility Study and Resulting Plan for the Bay Mills Indian Community

    SciTech Connect (OSTI)

    Kushman, Chris

    2014-02-03

    In 2011 the Inter-Tribal Council of Michigan, Inc. was awarded an Energy Efficiency Development and Deployment in Indian Country grant from the U.S. Department of Energy’s Tribal Energy Program. This grant aimed to study select Bay Mills Indian Community community/government buildings to determine what is required to reduce each building’s energy consumption by 30%. The Bay Mills Indian Community (BMIC) buildings with the largest expected energy use were selected for this study and included the Bay Mills Ellen Marshall Health Center building, Bay Mills Indian Community Administration Building, Bay Mills Community College main campus, Bay Mills Charter School and the Waishkey Community Center buildings. These five sites are the largest energy consuming Community buildings and comprised the study area of this project titled “Energy Efficiency Feasibility Study and Resulting Plan for the Bay Mills Indian Community”. The end objective of this study, plan and the Tribe is to reduce the energy consumption at the Community’s most energy intensive buildings that will, in turn, reduce emissions at the source of energy production, reduce energy expenditures, create long lasting energy conscious practices and positively affect the quality of the natural environment. This project’s feasibility study and resulting plan is intended to act as a guide to the Community’s first step towards planned energy management within its buildings/facilities. It aims to reduce energy consumption by 30% or greater within the subject facilities with an emphasis on energy conservation and efficiency. The energy audits and related power consumption analyses conducted for this study revealed numerous significant energy conservation and efficiency opportunities for all of the subject sites/buildings. In addition, many of the energy conservation measures require no cost and serve to help balance other measures requiring capital investment. Reoccurring deficiencies relating to heating, cooling, thermostat setting inefficiencies, powering computers, lighting, items linked to weatherization and numerous other items were encountered that can be mitigated with the energy conservation measures developed and specified during the course of this project.

  19. BNL Building 650 lead decontamination and treatment feasibility study. Final report

    SciTech Connect (OSTI)

    Kalb, P.D.; Cowgill, M.G.; Milian, L.W.

    1995-10-01

    Lead has been used extensively at Brookhaven National Laboratory (BNL) for radiation shielding in numerous reactor, accelerator and other research programs. A large inventory of excess lead (estimated at 410,000 kg) in many shapes and sizes is currently being stored. Due to it`s toxicity, lead and soluble lead compounds are considered hazardous waste by the Environmental Protection Agency. Through use at BNL, some of the lead has become radioactive, either by contamination of the surface or through activation by neutrons or deuterons. This study was conducted at BNL`s Environmental and Waste Technology Center for the BNL Safety and Environmental Protection Division to evaluate feasibility of various treatment options for excess lead currently being stored. The objectives of this effort included investigating potential treatment methods by conducting a review of the literature, developing a means of screening lead waste to determine the radioactive characteristics, examining the feasibility of chemical and physical decontamination technologies, and demonstrating BNL polyethylene macro-encapsulation as a means of treating hazardous or mixed waste lead for disposal. A review and evaluation of the literature indicated that a number of physical and chemical methods are available for decontamination of lead. Many of these techniques have been applied for this purpose with varying degrees of success. Methods that apply mechanical techniques are more appropriate for lead bricks and sheet which contain large smooth surfaces amenable to physical abrasion. Lead wool, turnings, and small irregularly shaped pieces would be treated more effectively by chemical decontamination techniques. Either dry abrasion or wet chemical methods result in production of a secondary mixed waste stream that requires treatment prior to disposal.

  20. A wire calorimeter for the SPIDER beam: Experimental tests and feasibility study

    SciTech Connect (OSTI)

    Pasqualotto, R. Serianni, G.; Veltri, P.; Cervaro, V.; Fasolo, D.; Mario, I.; Zanini, M.

    2015-04-08

    To study and optimize negative ion production and acceleration, in view of the use of neutral beam injectors in the ITER project, the SPIDER test facility (particle energy 100keV; beam current 50A, distributed over 1280 beamlets) is under construction in Padova, with the aim of testing beam characteristics and to verify the source proper operation, by means of several diagnostic systems. An array of tungsten wires, directly exposed to the beam and consequently heated to high temperature, is used in similar experiments at IPP-Garching to study the beam optics, which is one of the most important issues, in a qualitative way. The present contribution gives a description of an experimental investigation of the behavior of tungsten wires under high heat loads in vacuum. Samples of tungsten wires are heated by electrical currents and the emitted light is measured by a camera in the 400-1100nm wavelength range, which is proposed as a calibration tool. Simultaneously, the voltage applied to the wire is measured to study the dependency of emissivity on temperature. The feasibility study of a wire calorimeter for SPIDER is finally proposed; to this purpose, the expected behaviour of tungsten with the two-dimensional beam profile in SPIDER is numerically addressed.

  1. Feasibility study of the seismic reflection method in Amargosa Desert, Nye County, Nevada

    SciTech Connect (OSTI)

    Brocher, T.M.; Hart, P.E.; Carle, S.F.

    1990-11-01

    The US Geological Survey (USGS) working under an Interagency agreement with the Department of Energy is engaged in a broad geoscience program to assess and identify a potential repository for high level nuclear waste at Yucca Mountain, Nye County, Nevada. The USGS program, referred to as the Yucca Mountain Project, or YMP, consists of integrated geologic, hydrologic and geophysical studies which range in nature from site specific to regional. This report is an evaluation of different acquisition methods for future regional seismic reflection studies to be conducted in the vicinity of Yucca Mountain, located in the southwestern corner of the Nevada Test Site (NTS). In January 1988, field studies were conducted to investigate the feasibility of using the common-depth point (CDP) seismic reflection method to map subsurface geological horizons within the Amargosa Desert, Nye County, Nevada. The goal of the field study was to investigate which seismic reflection method(s) should be used for mapping shallow to lower-crustal horizons. Therefore, a wide-variety of field acquisition parameters were tested, included point versus linear receiver group arrays; Vibroseis (service and trademark of Conoco, Inc.) versus explosive sources; Vibroseis array patterns; and Vibroseis sweep and frequency range. 31 refs., 33 figs., 8 tabs.

  2. Feasibility Study of Compact Gas-Filled Storage Ring for 6D Cooling of Muon Beams

    SciTech Connect (OSTI)

    A. Garren, J. Kolonlo

    2005-10-31

    The future of elementary particle physics in the USA depends in part on the development of new machines such as the International Linear Collider, Muon Collider and Neutrino Factories which can produce particle beams of higher energy, intensity, or particle type than now exists. These beams will enable the continued exploration of the world of elementary particles and interactions. In addition, the associated development of new technologies and machines such as a Muon Ring Cooler is essential. This project was to undertake a feasibility study of a compact gas-filled storage ring for 6D cooling of muon beams. The ultimate goal, in Phase III, was to build, test, and operate a demonstration storage ring. The preferred lattice for the storage ring was determined and dynamic simulations of particles through the lattice were performed. A conceptual design and drawing of the magnets were made and a study of the RF cavity and possible injection/ejection scheme made. Commercial applications for the device were investigated and the writing of the Phase II proposal completed. The research findings conclude that a compact gas-filled storage ring for 6D cooling of muon beams is possible with further research and development.

  3. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    SciTech Connect (OSTI)

    Pentecost, E.D.; Vinikour, W.S.

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods.

  4. Transsinusoidal Portal Vein Embolization with Ethylene Vinyl Alcohol Copolymer (Onyx): A Feasibility Study in Pigs

    SciTech Connect (OSTI)

    Smits, Maarten L. J.; Vanlangenhove, Peter Sturm, Emiel J. C.; Bosch, Maurice A. A. J. van den; Hav, Monirath Praet, Marleen; Vente, Maarten A. D.; Snaps, Frederic R.; Defreyne, Luc

    2012-10-15

    Purpose: Portal vein embolization is performed to increase the future liver remnant before liver surgery in patients with liver malignancies. This study assesses the feasibility of a transsinusoidal approach for portal vein embolization (PVE) with the ethylene vinyl alcohol copolymer, Onyx. Methods: Indirect portography through contrast injection in the cranial mesenteric artery was performed in eight healthy pigs. Onyx was slowly injected through a microcatheter from a wedged position in the hepatic vein and advanced through the liver lobules into the portal system. The progression of Onyx was followed under fluoroscopy, and the extent of embolization was monitored by indirect portography. The pigs were euthanized immediately (n = 2), at 7 days (n = 4), or at 21 days postprocedure (n = 2). All pigs underwent necropsy and the ex vivo livers were grossly and histopathologically analyzed. Results: Transsinusoidal PVE was successfully performed in five of eight pigs (63%). In 14 of 21 injections (67%), a segmental portal vein could be filled completely. A mean of 1.6 liver lobes per pig was embolized (range 1-2 lobes). There were no periprocedural adverse events. Focal capsular scarring was visible on the surface of two resected livers, yet the capsules remained intact. Histopathological examination showed no signs of recanalization or abscess formation. Mild inflammatory reaction to Onyx was observed in the perivascular parenchyma. Conclusions: The porcine portal vein can be embolized through injection of Onyx from a wedged position in the hepatic vein. Possible complications of transsinusoidal PVE and the effect on contralateral hypertrophy need further study.

  5. Biomass Feasibility Analysis Report

    SciTech Connect (OSTI)

    Lipscomb, Brian

    2015-03-30

    Feasibility study to determine technical and economic viability of a co-generation biomass fuel power plant for the Confederated Salish and Kootenai Tribes.

  6. Technical Feasibility Study for Deployment of Ground-Source Heat Pump Systems: Portsmouth Naval Shipyard -- Kittery, Maine

    SciTech Connect (OSTI)

    Hillesheim, M.; Mosey, G.

    2014-11-01

    The U.S. Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response, in accordance with the RE-Powering America's Lands initiative, engaged the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to conduct feasibility studies to assess the viability of developing renewable energy generating facilities on contaminated sites. Portsmouth Naval Shipyard (PNSY) is a United States Navy facility located on a series of conjoined islands in the Piscataqua River between Kittery, ME and Portsmouth, NH. EPA engaged NREL to conduct a study to determine technical feasibility of deploying ground-source heat pump systems to help PNSY achieve energy reduction goals.

  7. Feasibility Study for Photovoltaics, Wind, solar Hot Water and Hybrid Systems

    SciTech Connect (OSTI)

    Hooks, Ronald; Montoya, Valerie

    2008-03-26

    Southwestern Indian Polytechnic Institute (SIPI) located in Albuquerque New Mexico is a community college that serves American Indians and Alaska Natives. SIPIs student body represents over 100 Native American Tribes. SIPI completed a renewable energy feasibility study program and established renewable energy hardware on the SIPI campus, which supplements and creates an educational resource to teach renewable energy courses. The SIPI campus is located, and has as student origins, areas, in which power is an issue in remote reservations. The following hardware was installed and integrated into the campus facilities: small wind turbine, large photovoltaic array that is grid-connected, two photovoltaic arrays, one thin film type, and one polycrystalline type, one dual-axis active tracker and one passive tracker, a hot air system for heating a small building, a portable hybrid photovoltaic system for remote power, and a hot water system to preheat water used in the SIPI Child Care facility. Educational curriculum has been developed for two renewable energy courses one being the study of energy production and use, and especially the roles renewable energy forms like solar, wind, geothermal, hydro, and biomass plays, and the second course being a more advanced in-depth study of renewable energy system design, maintenance, installation, and applications. Both courses rely heavily on experiential learning techniques so that installed renewable energy hardware is continuously utilized in hand-on laboratory activities and are part of the Electronics program of studies. Renewable energy technologies and science has also been included in other SIPI programs of study such as Environmental Science, Natural Resources, Agriculture, Engineering, Network Management, and Geospatial Technology.

  8. FEASIBILITY STUDY FOR POTASSIUM IODIDE (KI) DISTRIBUTION IN NEW YORK CITY.

    SciTech Connect (OSTI)

    MOSS, STEVEN

    2005-04-29

    The New York City Department of Health and Mental Hygiene (DOHMH), Bureau of Environmental Science and Engineering, Office of Radiological Health (ORH) [as the primary local technical consultant in the event of a radiological or nuclear incident within the boundaries of New York City] requested the assistance of Brookhaven National Laboratory (BNL) with the development of a Feasibility Study for Potassium Iodide (KI) distribution in the unlikely event of a significant release of radioactive iodine in or near New York City. Brookhaven National Laboratory had previously provided support for New York City with the development of the radiological/nuclear portions of its All Hazards Emergency Response Plans. The work is funded by Medical and Health Research Association (MHRA) of New York City, Inc., under a work grant by the Federal Centers for Disease Control (CDC) for Public Health Preparedness and Response for Bioterrorism. This report is part of the result of that effort. The conclusions of this report are that: (1) There is no credible radiological scenario that would prompt the need for large segments of the general population of New York City to take KI as a result of a projected plume exposure to radioiodine reaching even the lowest threshold of 5 rem to the thyroid; and (2) KI should be stockpiled in amounts and locations sufficient for use by first responders/emergency responders in response to any localized release of radioiodine.

  9. Performance of a feasibility study for remediation of WAG 6 at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Kubarewicz, J.; Pfeffer, J. [CH2M Hill, Oak Ridge, TN (United States); Garland, S.B. II [Oak Ridge National Lab., TN (United States); Riddle, S.P. [USDOE Oak Ridge Field Office, TN (United States); Branscom, K.S. [Radian Corp., Oak Ridge, TN (United States)

    1992-10-01

    This paper describes the process of preparing a feasibility study (FS) for remediation of a low-level radioactive waste (LLW) disposal site at Oak Ridge National Laboratory (ORNL). ORNL conducts research and development and is one of three DOE-owned facilities on the Oak Ridge Reservation (ORR). Waste Area Grouping (WAG) 6 is located in Melton Valley, approximately 2 miles southwest of the plant in Roane County, Tennessee. WAG 6 includes Solid Waste Storage Area (SWSA) 6, which is still used for shallow land burial of LLW and nonradioactive materials and was the primary focus of the FS. SWSA 6 covers 68 acres, 19 of which contain wastes such as low-level radioactive liquids, solids, sludges, asbestos, and biological and associated laboratory wastes. During the first 15 years of operation, the site also received chemical wastes, but since 1986, it has been used only for LLW. Until 1986, wastes were placed in unlined trenches and auger holes, but since then, wastes have been disposed in greater confinement disposal silos, lined pipe wells and auger holes, and above-ground tumulus units. A list of the sitewide alternatives initially developed for WAG 6 remediation is presented. The alternatives combined capping, structural stabilization (dynamic compaction/grouting), waste consolidation, and groundwater collection/treatment components. In situ vitrification was also considered for areas with significant long-life source inventories.

  10. A Feasibility Study for Recycling Used Automotive Oil Filters In A Blast Furnace

    SciTech Connect (OSTI)

    Ralph M. Smailer; Gregory L. Dressel; Jennifer Hsu Hill

    2002-01-21

    This feasibility study has indicated that of the approximately 120,000 tons of steel available to be recycled from used oil filters (UOF's), a maximum blast furnace charge of 2% of the burden may be anticipated for short term use of a few months. The oil contained in the most readily processed UOF's being properly hot drained and crushed is approximately 12% to 14% by weight. This oil will be pyrolized at a rate of 98% resulting in additional fuel gas of 68% and a condensable hydrocarbon fraction of 30%, with the remaining 2% resulting as carbon being added into the burden. Based upon the writer's collected information and assessment, there appears to be no operational problems relating to the recycling of UOF's to the blast furnace. One steel plant in the US has been routinely charging UOF's at about 100 tons to 200 tons per month for many years. Extensive analysis and calculations appear to indicate no toxic consideration as a result of the pyrolysis of the small contained oil ( in the 'prepared' UOFs) within the blast furnace. However, a hydrocarbon condensate in the ''gasoline'' fraction will condense in the blast furnace scrubber water and may require additional processing the water treatment system to remove benzene and toluene from the condensate. Used oil filters represent an additional source of high quality iron units that may be effectively added to the charge of a blast furnace for beneficial value to the operator and to the removal of this resource from landfills.

  11. The remedial investigation/feasibility study process at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    Martin Marietta Energy Systems, Inc. (Energy Systems), manages and operates the Oak Ridge National Laboratory (ORNL), Oak Ridge, Tennessee, under a cost-plus-award-fee contract administered by the Department of Energy`s (DOE) Oak Ridge Operations Office (Operations Office). Energy Systems` environmental restoration program is responsible for eliminating or reducing the risk posed by inactive and surplus sites and facilities that have been contaminated with radioactive, hazardous, or mixed wastes. The remedial investigation and feasibility study (RI/FS) is being conducted as part of Energy Systems` environmental restoration program. The objective of the audit was to determine if the proposed interim source control action identified in the ``Proposed Plan for the Oak Ridge National Laboratory Waste Area Grouping 6 Interim Remedial Action`` had been adequately justified. The audit disclosed that the proposed source control interim remedial action, three flexible membrane caps estimated to cost $140 million for waste area grouping 6, was not adequately justified. We recommended that DOE justify the proposed action before agreeing to proceed. The Manager, Oak Ridge Operations Office, generally concurred with the audit recommendations.

  12. Final report on the public involvement process phase 1, Monitored Retrievable Storage Facility Feasibility Study

    SciTech Connect (OSTI)

    Moore, L.; Shanteau, C.

    1992-12-01

    This report summarizes the pubic involvement component of Phase 1 of the Monitored Retrievable Storage Facility (NM) Feasibility Study in San Juan County, Utah. Part of this summary includes background information on the federal effort to locate a voluntary site for temporary storage of nuclear waste, how San Juan County came to be involved, and a profile of the county. The heart of the report, however, summarizes the activities within the public involvement process, and the issues raised in those various forums. The authors have made every effort to reflect accurately and thoroughly all the concerns and suggestions expressed to us during the five month process. We hope that this report itself is a successful model of partnership with the citizens of the county -- the same kind of partnership the county is seeking to develop with its constituents. Finally, this report offers some suggestions to both county officials and residents alike. These suggestions concern how decision-making about the county's future can be done by a partnership of informed citizens and listening decision-makers. In the Appendix are materials relating to the public involvement process in San Juan County.

  13. Final report on the public involvement process phase 1, Monitored Retrievable Storage Facility Feasibility Study

    SciTech Connect (OSTI)

    Moore, L.; Shanteau, C.

    1992-12-01

    This report summarizes the pubic involvement component of Phase 1 of the Monitored Retrievable Storage Facility (NM) Feasibility Study in San Juan County, Utah. Part of this summary includes background information on the federal effort to locate a voluntary site for temporary storage of nuclear waste, how San Juan County came to be involved, and a profile of the county. The heart of the report, however, summarizes the activities within the public involvement process, and the issues raised in those various forums. The authors have made every effort to reflect accurately and thoroughly all the concerns and suggestions expressed to us during the five month process. We hope that this report itself is a successful model of partnership with the citizens of the county -- the same kind of partnership the county is seeking to develop with its constituents. Finally, this report offers some suggestions to both county officials and residents alike. These suggestions concern how decision-making about the county`s future can be done by a partnership of informed citizens and listening decision-makers. In the Appendix are materials relating to the public involvement process in San Juan County.

  14. Cherokee Nation Enterprises Wind Energy Feasibility Study Final Report to U.S. DOE

    SciTech Connect (OSTI)

    Carol E. Wyatt

    2006-04-30

    CNE has conducted a feasibility study on the Chilocco property in north-central Oklahoma since the grant award on July 20, 2003. This study has concluded that there is sufficient wind for a wind farm and that with the Production Tax Credits and Green Tags, there will be sufficient energy to, not only cover the costs of the Nation’s energy needs, but to provide a profit. CNE has developed a wind energy team and is working independently and with industry partners to bring its renewable energy resources to the marketplace. We are continuing with the next phase in conducting avian, cultural and transmission studies, as well as continuing to measure the wind with the SoDAR unit. Cherokee Nation Enterprises, Inc. is a wholly-owned corporation under Cherokee Nation and has managed the Department of Energy grant award since July 20, 2003. In summary, we have determined there is sufficient wind for a wind farm at the Chilocco property where Cherokee Nation owns approximately 4,275 acres. The primary goal would be more of a savings in light of the electricity used by Cherokee Nation and its entities which totals an estimated eight million dollars per year. Cherokee Nation Enterprises (CNE), working independently and with industry partners, plans to bring its renewable energy resources into the marketplace through a well-documented understanding of our undeveloped resource. Our plan is to cultivate this resource in a way that will ensure the development and use for our energy will be in an environmentally and culturally acceptable form.

  15. Feasibility study of Nb3Al Rutherford cable for high field accelerator magnet application

    SciTech Connect (OSTI)

    Yamada, R.; /Fermilab; Kikuchi, A.; /Tsukuba Magnet Lab.; Ambrosio, G.; Andreev, N.; Barzi, E.; Cooper, C.; Feher, S.; Kashikhin, V.V.; Lamm, M.; Novitski, I.; /Fermilab; Takeuchi, T.; /Tsukuba Magnet Lab.; Tartaglia, M.; Turrioni, D.; /Fermilab; Verweij, A.P.; /CERN; Wake, M.; Willering, G; /Tsukuba Magnet Lab.; Zlobin, A.V.; /Fermilab

    2006-08-01

    Feasibility study of Cu stabilized Nb{sub 3}Al strand and Rutherford cable for the application to high field accelerator magnets are being done at Fermilab in collaboration with NIMS. The Nb{sub 3}Al strand, which was developed and manufactured at NIMS in Japan, has a non-copper Jc of about 844 A/mm{sup 2} at 15 Tesla at 4.2 K, a copper content of 50%, and filament size of about 50 microns. Rutherford cables with 27 Nb{sub 3}Al strands of 1.03 mm diameter were fabricated and tested. Quench tests on a short cable were done to study its stability with only its self field, utilizing a high current transformer. A pair of 2 meter long Nb{sub 3}Al cables was tested extensively at CERN at 4.3 and 1.9 K up to 11 Tesla including its self field with a high transport current of 20.2 kA. In the low field test we observed instability near splices and in the central region. This is related to the flux-jump like behavior, because of excessive amount of Nb in the Nb{sub 3}Al strand. There is possibility that the Nb in Nb{sub 3}Al can cause instability below 2 Tesla field regions. We need further investigation on this problem. Above 8 Tesla, we observed quenches near the critical surface at fast ramp rate from 1000 to 3000 A/sec, with quench velocity over 100 m/sec. A small racetrack magnet was made using a 14 m of Rutherford cable and successfully tested up to 21.8 kA, corresponding to 8.7 T.

  16. FEASIBILITY STUDY REPORT FOR THE 200-ZP-1 GROUNDWATER OPERABLE UNIT

    SciTech Connect (OSTI)

    BYRNES ME

    2008-07-18

    The Hanford Site, managed by the U.S. Department of Energy (DOE), encompasses approximately 1,517 km{sup 2} (586 mi{sup 2}) in the Columbia Basin of south-central Washington State. In 1989, the U.S. Environmental Protection Agency (EPA) placed the 100, 200, 300, and 1100 Areas of the Hanford Site on the 40 Code of Federal Regulations (CFR) 300, 'National Oil and Hazardous Substances Pollution Contingency Plan' National Contingency Plan [NCPD], Appendix B, 'National Priorities List' (NPL), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The 200 Areas NPL sites consist of the 200 West and 200 East Areas (Figure 1-1). The 200 Areas contain waste management facilities, inactive irradiated fuel reprocessing facilities, and the 200 North Area (formerly used for interim storage and staging of irradiated fuel). Several waste sites in the 600 Area, located near the 200 Areas, also are included in the 200 Areas NPL site. The 200 Areas NPL site is in a region referred to as the 'Central Plateau' and consists of approximately 700 waste sites, excluding sites assigned to the tank farm waste management areas (WMAs). The 200-ZP-1 Groundwater Operable Unit (OU) consists of the groundwater located under the northern portion of the 200 West Area. Waste sources that contributed to the 200-ZP-1 OU included cribs and trenches that received liquid and/or solid waste in the past from the Z Plant and T Plant aggregate areas, WMA-T, WMA-TX/TY, and the State-Approved Land Disposal Site (SALDS). This feasibility study (FS) for the 200-ZP-1 Groundwater OU was prepared in accordance with the requirements of CERCLA decision documents. These decision documents are part of the Administrative Record for the selection of remedial actions for each waste site and present the selected remedial actions that are chosen in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent practicable, the NCP. This FS conforms to the conditions set forth in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 2003) and amendments, signed by the Washington State Department of Ecology (Ecology), EPA, and DOE Richland Operations Office (RL). This also includes Tri-Party Agreement Milestone M-015-00C for completing all 200 Area non-tank farm OU pre-Record of Decision (ROD) documents on or before December 31, 2011. This FS supports the final remedy selection for the 200-ZP-1 OU, as described in the Remedial Investigation/Feasibility Study Work Plan for the 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI/FS work plan) (DOE/RL-2003-55), as agreed upon by RL and EPA. Tri-Party Agreement Milestone M-015-48B required Draft A of the 200-ZP-1 OU FS and proposed plan to be transmitted to EPA by September 30, 2007. As agreed to with EPA in the 200 Area Unit Managers Meeting Groundwater Operable Unit Status (FH-0503130), the baseline risk assessment (BRA) was delayed from inclusion in the remedial investigation (RI) report and is completed and documented in this FS. The Remedial Investigation Report for 200-ZP-1 Groundwater Operable Unit (referred to as the 200-ZP-1 RI report) (DOE/RL-2006-24) included an evaluation of human health and ecological risks and hazards. The RI report identified the radiological and chemical contaminants of potential concern (COPCs) that represent the primary risks to human health and the environment. The complete risk assessment in this FS incorporates additional analytical data from the unconfined aquifer that were obtained during or after preparation of the RI report, particularly for carbon tetrachloride and technetium-99. This FS also includes the initial results from an ongoing study of technetium-99 contamination near WMA-T, the sampling of new wells near the 216-W-LC laundry waste crib and T Plant, updated Hanford vadose zone fate and transport modeling, and groundwater particle-tracking analysis. The purpose of this FS is to develop and evaluate alternatives for remediation of the groundwater in the 200-ZP-1 OU. The alternatives considered provide a range of potential response actions (i.e., no action; institutional controls and monitored natural attenuation [MNA]; and pump-and-treat with MNA, flow-path control, and institutional controls) that are appropriate to address site-specific conditions. The alternatives are evaluated against seven of the nine CERCLA evaluation criteria defined in Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (EPA/540/G-891004). The remaining two CERCLA criteria will be formally assessed during the public comment period. The FS evaluation serves as the basis for identifying a remedy to mitigate potential risks to human health and the environment. A preferred alternative (or alternatives) will be presented to the public for review and comment in the proposed plan.

  17. Feasibility study of fuel grade ethanol plant for Alcohol Fuels of Mississippi, Inc. , Vicksburg, Mississippi

    SciTech Connect (OSTI)

    1981-01-01

    The results are presented of a feasibility study performed to determine the technical and economic viability of constructing an alcohol plant utilizing the N.Y.U. continuous acid hydrolysis process to convert wood wastes to fuel grade alcohol. The following is a summary of the results: (1) The proposed site in the Vicksburg Industrial Foundation Corporation Industrial Park is adequate from all standpoints, for all plant capacities envisioned. (2) Local hardwood sawmills can provide adequate feedstock for the facility. The price per dry ton varies between $5 and $15. (3) Sale of fuel ethanol would be made primarily through local distributors and an adequate market exists for the plant output. (4) With minor modifications to the preparation facilities, other waste cellulose materials can also be utilized. (5) There are no anticipated major environmental, health, safety or socioeconomic risks related to the construction and operation of the proposed facility. (6) The discounted cash flow and rate of return analysis indicated that the smallest capacity unit which should be built is the 16 million gallon per year plant, utilizing cogeneration. This facility has a 3.24 year payback. (7) The 25 million gallon per year plant utilizing cogeneration is an extremely attractive venture, with a zero interest break-even point of 1.87 years, and with a discounted rate of return of 73.6%. (8) While the smaller plant capacities are unattractive from a budgetary viewpoint, a prudent policy would dictate that a one million gallon per year plant be built first, as a demonstration facility. This volume contains process flowsheets and maps of the proposed site.

  18. SciThur AM: YIS - 04: Gold Nanoparticle Enhanced Arc Radiotherapy: A Monte Carlo Feasibility Study

    SciTech Connect (OSTI)

    Koger, B; Kirkby, C

    2014-08-15

    Introduction: The use of gold nanoparticles (GNPs) in radiotherapy has shown promise for therapeutic enhancement. In this study, we explore the feasibility of enhancing radiotherapy with GNPs in an arc-therapy context. We use Monte Carlo simulations to quantify the macroscopic dose-enhancement ratio (DER) and tumour to normal tissue ratio (TNTR) as functions of photon energy over various tumour and body geometries. Methods: GNP-enhanced arc radiotherapy (GEART) was simulated using the PENELOPE Monte Carlo code and penEasy main program. We simulated 360 arc-therapy with monoenergetic photon energies 50 1000 keV and several clinical spectra used to treat a spherical tumour containing uniformly distributed GNPs in a cylindrical tissue phantom. Various geometries were used to simulate different tumour sizes and depths. Voxel dose was used to calculate DERs and TNTRs. Inhomogeneity effects were examined through skull dose in brain tumour treatment simulations. Results: Below 100 keV, DERs greater than 2.0 were observed. Compared to 6 MV, tumour dose at low energies was more conformai, with lower normal tissue dose and higher TNTRs. Both the DER and TNTR increased with increasing cylinder radius and decreasing tumour radius. The inclusion of bone showed excellent tumour conformality at low energies, though with an increase in skull dose (40% of tumour dose with 100 keV compared to 25% with 6 MV). Conclusions: Even in the presence of inhomogeneities, our results show promise for the treatment of deep-seated tumours with low-energy GEART, with greater tumour dose conformality and lower normal tissue dose than 6 MV.

  19. Technical assumption for Mo-99 production in the MARIA reactor. Feasibility study

    SciTech Connect (OSTI)

    Jaroszewicz, J.; Pytel, K.; Dabkowski, L.; Krzysztoszek, G. [Institute of Atomic Energy, 05-400 Otwock-Swierk (Poland)

    2008-07-15

    The main objective of U-235 irradiation is to obtain the Tc-99m isotope which is widely used in the domain of medical diagnostics. The decisive factor determining its availability, despite its short life time, is a reaction of radioactive decay of Mo-99 into Tc- 99m. One of the possible sources of molybdenum can be achieved in course of the U-235 fission reaction. The paper presents activities and the calculations results obtained upon the feasibility study on irradiation of U-235 targets for production of molybdenum in the MARIA reactor. The activities including technical assumption were focused on performing calculation for modelling of the target and irradiation device as well as adequate equipment and tools for processing in reactor. It has been assumed that the basic component of fuel charge is an aluminium cladded plate with dimensions of 40x230x1.45 containing 4.7 g U-235. The presumed mode of the heat removal generated in the fuel charge of the reactor primary cooling circuit influences the construction of installation to be used for irradiation and the technological instrumentation. The outer channel construction for irradiation has to be identical as the standard fuel channel construction of the MARIA reactor. It enables to use the existing slab and reactor mounting sockets for the fastening of the molybdenum channel as well as the cooling water delivery system. The measurement of water temperature cooling a fuel charge and control of water flow rate in the channel can also be carried out be means of the standard instrumentation of the reactor. (author)

  20. A feasibility study for experimentally determining dynamic force distribution in a lap joint.

    SciTech Connect (OSTI)

    Mayes, Randall Lee

    2013-11-01

    Developing constitutive models of the physics in mechanical joints is currently stymied by inability to measure forces and displacements within the joint. The current state of the art estimates whole joint stiffness and energy loss per cycle from external measured force input and one or two acceleration responses. To validate constitutive models beyond this state requires a measurement of the distributed forces and displacements at the joint interface. Unfortunately, introducing measurement devices at the interface completely disrupts the desired physics. A feasibility study is presented for a non-intrusive method of solving for the interface dynamic forces from an inverse problem using full field measured responses. The responses come from the viewable surface of a beam. The noise levels associated with digital image correlation and continuous scanning laser Doppler velocimetry are evaluated from typical beam experiments. Two inverse problems are simulated. One utilizes the extended Sum of Weighted Accelerations Technique (SWAT). The second is a new approach dubbed the method of truncated orthogonal forces. These methods are much more robust if the contact patch geometry is well identified. Various approaches to identifying the contact patch are investigated, including ion marker tracking, Prussian blue and ultrasonic measurements. A typical experiment is conceived for a beam which has a lap joint at one end with a single bolt connecting it to another identical beam. In a virtual test using the beam finite element analysis, it appears that the SWAT inverse method requires evaluation of too many coefficients to adequately identify the force distribution to be viable. However, the method of truncated orthogonal forces appears viable with current digital image correlation (and probably other) imaging techniques.

  1. Ceramicrete{trademark} Stabilization of CST Resin: ITP Alternative Phase III Feasibility Study

    SciTech Connect (OSTI)

    Langton, C.A.

    1998-12-07

    The Ceramicrete{trademark} waste form is a magnesium phosphate hydrate, which sets as the result of an acid-base reaction between KH{sub 2}PO{sub 4} and MgO in the presence of water. Based on the results of this feasibility study, this low temperature ceramic waste form is acceptable for stabilization of cesium loaded crystalline silicotitanate (CST) resin. The performance objective of CST stabilization is to convert a friable powdered resin into a monolithic form to improve handling and storage and to reduce the waste mobility. Advantages of this type of the CST-Ceramicrete{trademark} waste form include: room temperature processing of a fluid slurry, limited off gas, flexible mix designs, rapid setting, no free liquids, temperature tolerant and durable up to at least 90 degrees C. The Ceramicrete/220 waste form can be processed by in-container mixing or by batch mixing. Since a trace amount of free water will be associated with the wet resin in the CST-Ceramicrete{trademark} waste form, radiolysis of the free water may cause pressurization of the containers. Leaching tests were conducted to evaluate the CST-Ceramicrete{trademark} waste form performance relative to high-level waste glass. Results were very encouraging given that only one waste loading (50 wt. percent resin) was tested and that the leaching procedures were not fully optimized for a non-glass waste form. In general, the cesium leachability per the PCT test of the CST-Ceramicrete{trademark} waste was about 2X more than that of the ARM glass and about 200X more than the EA glass. For monolithic samples (MCC-1 test), the CST-Ceramicrete{trademark} waste form leached 4X to7X more cesium than the ARM glass. (The EA glass is not suited to monolithic leaching.) The CST-Ceramicrete{trademark} leaching results appear to be independent of curing temperature over the range 24 to 90 degrees C.

  2. Preconceptual Feasibility Study to Evaluate Alternative Means to Produce Plutonium-238

    SciTech Connect (OSTI)

    John D. Bess; Matthew S. Everson

    2013-02-01

    There is currently no large-scale production of 238Pu in the United States. Feasibility studies were performed at the Idaho National Laboratory to assess the capability of developing alternative 238Pu production strategies. Initial investigations indicate potential capability to provision radioisotope-powered systems for future space exploration endeavors. For the short term production of 238Pu, sealed canisters of dilute 237Np solution in nitric acid could be irradiated in the Advanced Test Reactor (ATR). Targets in the large and medium I positions of the ATR were irradiated over a simulated period of 306 days and analyzed using MCNP5 and ORIGEN2.2. Approximately 0.5 kg of 238Pu could be produced annually in the ATR with purity greater than 92%. Optimization of the irradiation cycles could further increase the purity to greater than 98%. Whereas the typical purity of space batteries is between 80 to 85%, the higher purity 238Pu produced in the ATR could be blended with existing lower-purity inventory to produce useable material. Development of irradiation methods in the ATR provides the fastest alterative to restart United States 238Pu production. The analysis of 238Pu production in the ATR provides the technical basis for production using TRIGA (Training, Research, Isotopes, General Atomics) nuclear reactors. Preliminary analyses envisage a production rate of approximately 0.7 kg annually using a single dedicated 5-MW TRIGA reactor with continuous flow loops to achieve high purity product. Two TRIGA reactors represent a robust means of providing at over 1 kg/yr of 238Pu annually using dilute solution targets of 237Np in nitric acid. Further collaboration and optimization of reactor design, radiochemical methods, and systems analyses would further increase annual 238Pu throughput, while reducing the currently evaluated reactor requirements.

  3. Feasibility study report for the 200-BP-1 operable unit. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This feasibility study (FS) examines a range of alternatives and provides recommendations for selecting a preferred altemative for remediating contamination at the 200-BP-1 operable unit. The 200-BP-1 operable unit is located in the center of the Hanford Site along the northern boundary of the 200 East Area. The 241-BY Tank Farm is located immediately to the south of the operable unit. 200-BP-1 is a source operable unit with contaminated soils associated primarily with nine inactive cribs (known as the 216-B cribs). These cribs were used for disposal of low-level radioactive liquid waste from U Plant uranium recovery operations, and waste storage tank condensate from the adjacent 241-BY Tank Farm. The cribs used for disposal of U Plant waste were in operation from 1955--1965, and the cribs used for disposal of tank condensate were in operation from 1965-1975. In addition to the cribs, four unplanned releases of radioactive materials have occurred within the operable unit. Contaminated surface soils associated with the unplanned releases have been consolidated over the cribs and covered with clean soil to reduce contaminant migration and exposure. Discharge of wastes to the cribs has resulted in soil and groundwater contamination. The groundwater is being addressed as part of the 200 East Aggregate Area groundwater operable unit. Contaminated soils at the site can be categorized by the types of contaminants, their distribution in the soil column, and the risk posed by the various potential exposure pathways. Below the clean soil cover, the near surface soils contain low-:levels of contamination with cesium-137, radium-226, strontium-90, thorium-228 and uranium. The lifetime incremental cancer risk associated with these soils if they were exposed at the surface is 9 {times} 10{sup 5}.

  4. Recent progress in the feasibility study for the first nuclear power plant in Indonesia

    SciTech Connect (OSTI)

    Subki, I.R.; Iskandar, A.; Supadi, S. [National Atomic Energy Agency, Jakarta (Indonesia)

    1994-12-31

    Many have come to realise that an increasing demand for and supply of energy is a necessity to support national development. Conservation efforts also contribute, by the more efficient use of energy and by avoiding its unnecessary use. However, some are of the opinion that conservation would be able to add to the supply of energy, but this viewpoint still requires further consideration. In Indonesia, the energy consumption since 1970 has been continually increasing with an average rate of 10.6%/year in support of the development in all sectors. In the case of electric energy for the whole of Indonesia, in the year 1990/1991 the installed capacity was 9275 MW in the State Electricity Company (PLN) network with an electrical consumption during that year amounting to 34.0 TWh. The increase of consumption during the last two years amounted to 17.5% and 17.9%/year. Over this period the share of supply of electricity has consistently increased. Specifically for the island of Java, which accounts for 80% of all of the Indonesian electricity consumptions, the installed capacity by PLN in the year 1990/1991 was 6363 MW (the same amount of capacity also exists outside PLN), and increased by 17%/year during it last three years. The actual and projected figures at Oven. It is worth noting that, for example, the projected installed capacity for 2003-04 is now 31.8 GW, which is far higher than the previous projection for 2010-11 of only 25.5 GW. In view of this the government has decided to conduct feasibility studies of the nuclear option, with the goal of fulfilling the deficit or gap in supply where other options are likely to reach their limitations.

  5. SUPERCRITICAL WATER PARTIAL OXIDATION PHASE I - PILOT-SCALE TESTING / FEASIBILITY STUDIES FINAL REPORT

    SciTech Connect (OSTI)

    SPRITZER,M; HONG,G

    2005-01-01

    Under Cooperative Agreement No. DE-FC36-00GO10529 for the Department of Energy, General Atomics (GA) is developing Supercritical Water Partial Oxidation (SWPO) as a means of producing hydrogen from low-grade biomass and other waste feeds. The Phase I Pilot-scale Testing/Feasibility Studies have been successfully completed and the results of that effort are described in this report. The Key potential advantages of the SWPO process is the use of partial oxidation in-situ to rapidly heat the gasification medium, resulting in less char formation and improved hydrogen yield. Another major advantage is that the high-pressure, high-density aqueous environment is ideal for reaching and gasifying organics of all types. The high water content of the medium encourages formation of hydrogen and hydrogen-rich products and is especially compatible with high water content feeds such as biomass materials. The high water content of the medium is also effective for gasification of hydrogen-poor materials such as coal. A versatile pilot plant for exploring gasification in supercritical water has been established at GA's facilities in San Diego. The Phase I testing of the SWPO process with wood and ethanol mixtures demonstrated gasification efficiencies of about 90%, comparable to those found in prior laboratory-scale SCW gasification work carreid out at the University of Hawaii at Manoa (UHM) as well as other biomass gasification experience with conventional gasifiers. As in the prior work at UHM, a significant amount of the hydrogen found in the gas phase products is derived from the water/steam matrix. The studies at UHM utilized an indirectly heated gasifier with an acitvated carbon catalyst. In contrast, the GA studies utilized a directly heated gasifier without catalyst, plus a surrogate waste fuel. Attainment of comparable gasification efficiencies without catalysis is an important advancement for the GA process, and opens the way for efficient hydrogen production from low-value, dirty feed materials. The Phase I results indicate that a practical means to overcome limitations on biomass slurry feed concentration and preheat temperatuare is to coprocess an auxiliary high heating value material. SWPO coprocessing of tow hgih-water content wastes, partially dewatered sewage sludge and trap grease, yields a scenario for the production of hydrogen at highly competitive prices. It is estimated that there are hundreds if not thousands of potential sites for this technology across the US and worldwide.

  6. JCCRER Project 2.3 -- Deterministic effects of occupational exposure to radiation. Phase 1: Feasibility study; Final report

    SciTech Connect (OSTI)

    Okladnikova, N.; Pesternikova, V.; Sumina, M.

    1998-12-01

    Phase 1 of Project 2.3, a short-term collaborative Feasibility Study, was funded for 12 months starting on 1 February 1996. The overall aim of the study was to determine the practical feasibility of using the dosimetric and clinical data on the MAYAK worker population to study the deterministic effects of exposure to external gamma radiation and to internal alpha radiation from inhaled plutonium. Phase 1 efforts were limited to the period of greatest worker exposure (1948--1954) and focused on collaboratively: assessing the comprehensiveness, availability, quality, and suitability of the Russian clinical and dosimetric data for the study of deterministic effects; creating an electronic data base containing complete clinical and dosimetric data on a small, representative sample of MAYAK workers; developing computer software for the testing of a currently used health risk model of hematopoietic effects; and familiarizing the US team with the Russian diagnostic criteria and techniques used in the identification of Chronic Radiation Sickness.

  7. Feasibility Study of Economics and Performance of Solar PV at the Atlas Industrial Park in Duluth, Minnesota

    SciTech Connect (OSTI)

    Steen, M.; Lisell, L.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA) Region 5, in accordance with the RE-Powering America's Land initiative, selected the Atlas Industrial Park in Duluth, Minnesota, for a feasibility study of renewable energy production. The EPA provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of solar renewable energy generation at the Atlas Industrial Park. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this study is to assess the site for a possible PV installation and estimate the cost, performance, and site impacts of different PV configurations. In addition, the study evaluates financing options that could assist in the implementation of a PV system at the site.

  8. Tracking tumor boundary in MV-EPID images without implanted markers: A feasibility study

    SciTech Connect (OSTI)

    Zhang, Xiaoyong Homma, Noriyasu; Ichiji, Kei; Takai, Yoshihiro; Yoshizawa, Makoto

    2015-05-15

    Purpose: To develop a markerless tracking algorithm to track the tumor boundary in megavoltage (MV)-electronic portal imaging device (EPID) images for image-guided radiation therapy. Methods: A level set method (LSM)-based algorithm is developed to track tumor boundary in EPID image sequences. Given an EPID image sequence, an initial curve is manually specified in the first frame. Driven by a region-scalable energy fitting function, the initial curve automatically evolves toward the tumor boundary and stops on the desired boundary while the energy function reaches its minimum. For the subsequent frames, the tracking algorithm updates the initial curve by using the tracking result in the previous frame and reuses the LSM to detect the tumor boundary in the subsequent frame so that the tracking processing can be continued without user intervention. The tracking algorithm is tested on three image datasets, including a 4-D phantom EPID image sequence, four digitally deformable phantom image sequences with different noise levels, and four clinical EPID image sequences acquired in lung cancer treatment. The tracking accuracy is evaluated based on two metrics: centroid localization error (CLE) and volume overlap index (VOI) between the tracking result and the ground truth. Results: For the 4-D phantom image sequence, the CLE is 0.23 0.20 mm, and VOI is 95.6% 0.2%. For the digital phantom image sequences, the total CLE and VOI are 0.11 0.08 mm and 96.7% 0.7%, respectively. In addition, for the clinical EPID image sequences, the proposed algorithm achieves 0.32 0.77 mm in the CLE and 72.1% 5.5% in the VOI. These results demonstrate the effectiveness of the authors proposed method both in tumor localization and boundary tracking in EPID images. In addition, compared with two existing tracking algorithms, the proposed method achieves a higher accuracy in tumor localization. Conclusions: In this paper, the authors presented a feasibility study of tracking tumor boundary in EPID images by using a LSM-based algorithm. Experimental results conducted on phantom and clinical EPID images demonstrated the effectiveness of the tracking algorithm for visible tumor target. Compared with previous tracking methods, the authors algorithm has the potential to improve the tracking accuracy in radiation therapy. In addition, real-time tumor boundary information within the irradiation field will be potentially useful for further applications, such as adaptive beam delivery, dose evaluation.

  9. Wind Generation Feasibility Study for Sac & Fox Tribe of the Mississippi in Iowa (Meskwaki Nation)

    SciTech Connect (OSTI)

    Lasley, Larry C.

    2013-03-19

    1.2 Overview The Meskwaki Nation will obtain an anemometer tower. Install the tower at the site that has been pre-qualified as the site most likely to produce maximum electric power from the wind. It will collect meteorological data from the tower’s sensors for a one year period, as required for due diligence to identify the site as appropriate for the installation of a wind turbine to provide electric power for the community. Have the collected data analyzed by a meteorologist and a professionally certified wind engineer to produce the reports of expected power generation at the site, for the specific wind turbine(s) under consideration for installation. 1.2.1 Goals of the Tribe The feasibility study reports, including technical and business analyses will be used to obtain contracts and financing required to develop and implement a wind turbine project on the Meskwaki Settlement. Our goal is to produce two (2) mega watts of power and to reduce the cost for electricity currently being paid by the Meskwaki Casino. 1.2.2 Project Objectives Meet the energy needs of the community with clean energy. Bring renewable energy to the settlement in a responsible, affordable manner. Maximize both the economic and the spiritual benefits to the tribe from energy independence. Integrate the Tribe’s energy policies with its economic development goals. Contribute to achieving the Tribe’s long-term goals of self-determination and sovereignty. 1.2.3 Project Location The precise location proposed for the tower is at the following coordinates: 92 Degrees, 38 Minutes, 46.008 Seconds West Longitude 41 Degrees, 59 Minutes, 45.311 Seconds North Latitude. A circle of radius 50.64 meters, enclosing and area of 1.98 acres in PLSS Township T83N, Range R15W, in Iowa. In relative directions, the site is 1,650 feet due west of the intersection of Highway 30 and 305th Street in Tama, Iowa, as approached from the direction of Toledo, Iowa. It is bounded on the north by Highway 30 and on the south by 305th Street, a street which runs along a meandering west-south-west heading from this intersection with Highway 30. In relation to Settlement landmarks, it is 300 meters west of the Meskwaki water tower found in front of the Meskwaki Public Works Department, and is due north of the athletic playing fields of the Meskwaki Settlement School. The accompanying maps (in the Site Resource Maps File) use a red pushpin marker to indicate the exact location, both in the overview frames and in the close-up frame. 1.2.4 Long Term Energy Vision The Meskwaki Tribe is committed to becoming energy self-sufficient, improving the economic condition of the tribe, and maintaining Tribal Values of closeness with Grandmother Earth. The details of the Tribe’s long-term vision continues to evolve. A long term vision exists of: 1) a successful assessment program; 2) a successful first wind turbine project reducing the Tribe’s cost of electricity; 3) creation of a Meskwaki Tribal Power Utility/Coop under the auspices of the new tribal Corporation, as we implement a master plan for economic and business development; 4), and opening the doors for additional wind turbines/renewable energy sources on the community. The additional turbines could lead directly to energy self-sufficiency, or might be the one leg of a multi-leg approach using multiple forms of renewable energy to achieve self-sufficiency. We envision current and future assessment projects providing the data needed to qualify enough renewable energy projects to provide complete coverage for the entire Meskwaki Settlement, including meeting future economic development projects’ energy needs. While choosing not to engage in excessive optimism, we can imagine that in the future the Iowa rate-setting bodies will mandate that grid operators pay fair rates (tariffs) to renewable suppliers. We will be ready to expand renewable production of electricity for export, when that time comes. The final report includes the Wind Generation Feasibility Study prepared by Wind Utility Consulting, PC and Preliminary Environmental Documentation Report prepared by Snyder & Associates.

  10. Laser Drilling: Drilling with the Power of Light Phase 1: Feasibility Study

    SciTech Connect (OSTI)

    Brian C. Gahan; Richard A. Parker; Ramona Graves; Samih Batarseh; Claude B. Reed; Zhiyue Xu; Humberto Figueroa; Neal Skinner

    2001-09-01

    A laser drilling research team was formed from members of academia, industry and national laboratory to explore the feasibility of using modern high-powered lasers to drill and complete oil and gas wells. The one-year Phase 1 study discussed in this report had the goals of quantifying the amount of pulsed infrared laser energy needed to spall and melt rock of varying lithologies and to investigate the possibility of accomplishing the same task in water under atmospheric conditions. Previous work by some members of this team determined that continuous wave lasers of varying wavelengths have more than enough power to cut, melt and vaporize rock. Samples of sandstone, limestone, and shale were prepared for laser beam interaction with a 1.6 kW pulsed Nd:YAG laser beam to determine how the beam's size, power, repetition rate, pulse width, exposure time and energy can affect the amount of energy transferred to the rock for the purposes of spallation, melting and vaporization. The purpose of the laser rock interaction experiment was to determine the threshold parameters required to remove a maximum rock volume from the samples while minimizing energy input. Absorption of radiant energy from the laser beam gives rise to the thermal energy transfer required for the destruction and removal of the rock matrix. Results from the tests indicate that each rock type has a set of optimal laser parameters to minimize specific energy (SE) values as observed in a set of linear track and spot tests. In addition, it was observed that the rates of heat diffusion in rocks are easily and quickly overrun by absorbed energy transfer rates from the laser beam to the rock. As absorbed energy outpaces heat diffusion by the rock matrix, local temperatures can rise to the melting points of the minerals and quickly increase observed SE values. The lowest SE values are obtained in the spalling zone just prior to the onset of mineral melt. The current study determined that using pulsed lasers could accomplish removing material from rock more efficiently than continuous wave lasers. The study also determined that reducing the effect of secondary energy absorbing mechanisms resulted in lower energy requirements in shale and, to some extent, in sandstones. These secondary mechanisms are defined as physical processes that divert beam energy from directly removing rock, and may include thermally-induced phase behavior changes of rock minerals (i.e., melting, vaporization, and dissociation) and fractures created by thermal expansion. Limestone is spalled by a different mechanism and does not seem to be as affected by secondary mechanisms. It was also shown that the efficiency of the cutting mechanism improved by saturating porous rock samples with water, and that a laser beam injected directly through a water layer at a sandstone sample was able to spall and melt the sample.

  11. Feasibility study to evaluate plasma quench process for natural gas conversion applications. [Quarterly report], July 1, 1993--September 30, 1993

    SciTech Connect (OSTI)

    Thomas, C.P.; Kong, P.C.; Detering, B.A.

    1993-12-31

    The objective of this work was to conduct a feasibility study on a new process, called the plasma quench process, for the conversion of methane to acetylene. FY-1993 efforts were focused on determining the economic viability of this process using bench scale experimental data which was previously generated. This report presents the economic analysis and conclusions of the analysis. Future research directions are briefly described.

  12. Remedial investigation/feasibility study for the David Witherspoon, Inc., 901 Site, Knoxville, Tennessee: Volume 2, Appendixes

    SciTech Connect (OSTI)

    1996-10-01

    This document contains the appendixes for the remedial investigation and feasibility study for the David Witherspoon, Inc., 901 site in Knoxville, Tennessee. The following topics are covered in the appendixes: (A) David Witherspoon, Inc., 901 Site Historical Data, (B) Fieldwork Plans for the David Witherspoon, Inc., 901 Site, (C) Risk Assessment, (D) Remediation Technology Discussion, (E) Engineering Support Documentation, (F) Applicable or Relevant and Appropriate Requirements, and (G) Cost Estimate Documentation.

  13. Idaho Nuclear Technology and Engineering Center Newly Generated Liquid Waste Demonstration Project Feasibility Study

    SciTech Connect (OSTI)

    Herbst, A.K.

    2000-02-01

    A research, development, and demonstration project for the grouting of newly generated liquid waste (NGLW) at the Idaho Nuclear Technology and Engineering Center is considered feasible. NGLW is expected from process equipment waste, decontamination waste, analytical laboratory waste, fuel storage basin waste water, and high-level liquid waste evaporator condensate. The potential grouted waste would be classed as mixed low-level waste, stabilized and immobilized to meet RCRA LDR disposal in a grouting process in the CPP-604 facility, and then transported to the state.

  14. Feasibility Study for an Autonomous UAV -Magnetometer System -- Final Report on SERDP SEED 1509:2206

    SciTech Connect (OSTI)

    Roelof Versteeg; Mark McKay; Matt Anderson; Ross Johnson; Bob Selfridge; Jay Bennett

    2007-09-01

    Large areas across the United States are potentially contaminated with UXO, with some ranges encompassing tens to hundreds of thousands of acres. Technologies are needed which will allow for cost effective wide area scanning with 1) near 100 % coverage and 2) near 100 % detection of subsurface ordnance or features indicative of subsurface ordnance. The current approach to wide area scanning is a multi-level one, in which medium altitude fixed wing optical imaging is used for an initial site assessment. This assessment is followed with low altitude manned helicopter based magnetometry followed by surface investigations using either towed geophysical sensor arrays or man portable sensors. In order to be effective for small UXO detection, the sensing altitude for magnetic site investigations needs to be on the order of 1 3 meters. These altitude requirements means that manned helicopter surveys will generally only be feasible in large, open and relatively flat terrains. While such surveys are effective in mapping large areas relatively fast there are substantial mobilization/demobilization, staffing and equipment costs associated with these surveys (resulting in costs of approximately $100-$150/acre). Surface towed arrays provide high resolution maps but have other limitations, e.g. in their ability to navigate rough terrain effectively. Thus, other systems are needed allowing for effective data collection. An UAV (Unmanned Aerial Vehicle) magnetometer platform is an obvious alternative. The motivation behind such a system is that it would be safer for the operators, cheaper in initial and O&M costs, and more effective in terms of site characterization. However, while UAV data acquisition from fixed wing platforms for large (> 200 feet) stand off distances is relatively straight forward, a host of challenges exist for low stand-off distance (~ 6 feet) UAV geophysical data acquisition. The objective of SERDP SEED 1509:2006 was to identify the primary challenges associated with a low stand off distance autonomous UAV magnetometer platform and to investigate whether these challenges can be resolved successfully such that a successful UAV magnetometer platform can be constructed. The primary challenges which were identified and investigated include: 1. The feasibility of assembling a payload package which integrates magnetometers, accurate positioning systems (DGPS, height above ground measurement), obstacle avoidance systems, power infrastructure, communications and data storage as well as auxiliary flight controls 2. The availability of commercial UAV platforms with autonomous flight capability which can accommodate this payload package 3. The feasibility of integrating obstacle avoidance controls in UAV platform control 4. The feasibility of collecting high quality magnetic data in the vicinity of an UAV.

  15. Otec power plant for the Marshall Islands. Feasibility study phase 2. Project implementation. Final report. Export trade information

    SciTech Connect (OSTI)

    1996-03-25

    This report presents the results of phase 2 of a study which was conducted to assess the economic and design feasibility of a 5-10 MW OTEC power plant to be installed at Majuro, Marshall Islands. The document is divided into (1) Introduction; (2) Executive Summary; (3) Study Highlights, Conclusions, and Recommendations; (4) Phase 2 - Project Implementation Goals; (5) Study Task 1.0 - Project Planning; (6) Study Task 2.0 - Conceptual Design/Risk Reduction; (7) Preliminary Oceanographic and Site Survey; (8) List of References; (9) List of Appendices.

  16. A feasibility study of oil shale fired pulse combustors with applications to oil shale retorting

    SciTech Connect (OSTI)

    Morris, G.J.; Johnson, E.K.; Zhang, G.Q.; Roach, R.A.

    1992-07-01

    The results of the experimental investigation performed to determine the feasibility of using pulverized Colorado oil shale to fuel a bench scale pulse combustor reveal that oil shale cannot sustain pulsations when used alone as fuel. Trace amounts of propane mixed with the oil shale enabled the pulsations, however. Up to 80% of the organic material in the oil shale was consumed when it was mixed with propane in the combustor. Beyond the feasibility objectives, the operating conditions of the combustor fuel with propane and mixtures of oil shale and propane were characterized with respect to pulsation amplitude and frequency and the internal combustor wall temperature over fuel lean and fuel rich stoichiometries. Maximum pressure excursions of 12.5 kPa were experienced in the combustor. Pulsation frequencies ranged from 50 to nearly 80 Hz. Cycle resolved laser Doppler anemometry velocities were measured at the tail pipe exit plane. Injecting inert mineral matter (limestone) into the pulse combustor while using propane fuel had only a slight effect on the pulsation frequency for the feed rates tested.

  17. Hydrodynamic Modeling Analysis for Leque Island and zis a ba Restoration Feasibility Study

    SciTech Connect (OSTI)

    Whiting, Jonathan M.; Khangaonkar, Tarang

    2015-01-31

    Ducks Unlimited, Inc. in collaboration with Washington State Department of Fish and Wildlife (WDFW), and Stillaguamish Tribe of Indians have proposed the restoration of Leque Island and zis a ba (formerly Matterand) sites near the mouth of Old Stillaguamish River Channel in Port Susan Bay, Washington. The Leque Island site, which is owned by WDFW, consists of nearly 253 acres of land south of Highway 532 that is currently behind a perimeter dike. The 90-acres zis a ba site, also shielded by dikes along the shoreline, is located just upstream of Leque Island and is owned by Stillaguamish Tribes. The proposed actions consider the removal or modification of perimeter dikes at both locations to allow estuarine functions to be restored. The overall objective of the proposed projects is to remove the dike barriers to 1) provide connectivity and access between the tidal river channel and the restoration site for use by juvenile migrating salmon and 2) create a self-sustaining tidal marsh habitat. Ducks Unlimited engaged Pacific Northwest National Laboratory (PNNL) to develop a three-dimensional hydrodynamic model of the Port Susan Bay, Skagit Bay, and the interconnecting Leque Island region for use in support of the feasibility assessment for the Leque Island and zis a ba restoration projects. The objective of this modeling-based feasibility assessment is to evaluate the performance of proposed restoration actions in terms of achieving habitat goals while assessing the potential hydraulic and sediment transport impacts to the site and surrounding parcels of land.

  18. Feasibility study of prompt gamma neutron activation for NDT measurement of moisture in stone and brick

    SciTech Connect (OSTI)

    Livingston, R. A.; Al-Sheikhly, M.; Grissom, C.; Aloiz, E.; Paul, R.

    2014-02-18

    The conservation of stone and brick architecture or sculpture often involves damage caused by moisture. The feasibility of a NDT method based on prompt gamma neutron activation (PGNA) for measuring the element hydrogen as an indication of water is being evaluated. This includes systematic characterization of the lithology and physical properties of seven building stones and one brick type used in the buildings of the Smithsonian Institution in Washington, D.C. To determine the required dynamic range of the NDT method, moisture-related properties were measured by standard methods. Cold neutron PGNA was also used to determine chemically bound water (CBW) content. The CBW does not damage porous masonry, but creates an H background that defines the minimum level of detection of damaging moisture. The CBW was on the order of 0.5% for all the stones. This rules out the measurement of hygric processes in all of the stones and hydric processed for the stones with fine scale pore-size distributions The upper bound of moisture content, set by porosity through water immersion, was on the order of 5%. The dynamic range is about 1020. The H count rates were roughly 13 cps. Taking into account differences in neutron energies and fluxes and sample volume between cold PGNA and a portable PGNA instrument, it appears that it is feasible to apply PGNA in the field.

  19. MR-guided Periarterial Ethanol Injection for Renal Sympathetic Denervation: A Feasibility Study in Pigs

    SciTech Connect (OSTI)

    Streitparth, F. Walter, A.; Stolzenburg, N.; Heckmann, L.; Breinl, J.; Rinnenthal, J. L.; Beck, A.; De Bucourt, M.; Schnorr, J.; Bernhardt, U.; Gebauer, B.; Hamm, B.; Guenther, R. W.

    2013-06-15

    Purpose. To evaluate the feasibility and efficacy of image-guided periarterial ethanol injection as an alternative to transluminal radiofrequency ablation. Methods. Unilateral renal periarterial ethanol injection was performed under general anesthesia in 6 pigs with the contralateral kidney serving as control. All interventions were performed in an open 1.0 T MRI system under real-time multiplanar guidance. The injected volume was 5 ml (95 % ethanol labelled marked MR contrast medium) in 2 pigs and 10 ml in 4 pigs. Four weeks after treatment, the pigs underwent MRI including MRA and were killed. Norepinephrine (NE) concentration in the renal parenchyma served as a surrogate parameter to analyze the efficacy of sympathetic denervation. In addition, the renal artery and sympathetic nerves were examined histologically to identify evidence of vascular and neural injury. Results. In pigs treated with 10 ml ethanol, treatment resulted in neural degeneration. We found a significant reduction of NE concentration in the kidney parenchyma of 53 % (p < 0.02) compared with the untreated contralateral kidney. In pigs treated with 5 ml ethanol, no significant changes in histology or NE were observed. There was no evidence of renal arterial stenosis in MRI, macroscopy or histology in any pig. Conclusion. MR-guided periarterial ethanol injection was feasible and efficient for renal sympathetic denervation in a swine model. This technique may be a promising alternative to the catheter-based approach in the treatment of resistant arterial hypertension.

  20. Feasibility study of burning waste paper in coal-fired boilers on Air Force installations. Master's thesis

    SciTech Connect (OSTI)

    Smith, K.P.

    1993-09-01

    This thesis examined the feasibility of using waste paper derived fuel in coal-fired boilers on Air Force installations in an attempt to help solve air pollution and solid waste disposal problems. The implementation of waste paper derived fuel was examined from both a technical acceptability and an economic feasibility viewpoint. The majority of data for this study was obtained through literature reviews and personal interviews. Waste paper was found to be technically acceptable for use as fuel. However, waste paper has certain characteristics that may create problems during combustion and therefore further research is required. These problems included the possibility of increased nitrous oxide emissions, increased volatile emissions, dioxin and furan emissions, formation of hydrochloric acid, and the presence of heavy metals in emissions and ash.

  1. Feasibility Study of Economics and Performance of Solar Photovoltaics in the Commonwealth of Puerto Rico

    SciTech Connect (OSTI)

    Salasovich, J.; Mosey, G.

    2011-03-01

    This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on brownfield sites in the Commonwealth of Puerto Rico. All of the assessed sites are landfills. The sites were assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzed using an electric rate of $0.119/kWh and incentives offered by Puerto Rico and by the serving utility, PREPA. According to the site production calculations, the most cost-effective system in terms of return on investment is the thin-film fixed-tilt technology. The report recommends financing options that could assist in the implementation of such a system.

  2. A Feasibility Study of Steelmaking by Molten Oxide Electrolysis (TRP9956)

    SciTech Connect (OSTI)

    Donald R. Sadoway; Gerbrand Ceder

    2009-12-31

    Molten oxide electrolysis (MOE) is an extreme form of molten salt electrolysis, a technology that has been used to produce tonnage metals for over 100 years - aluminum, magnesium, lithium, sodium and the rare earth metals specifically. The use of carbon-free anodes is the distinguishing factor in MOE compared to other molten salt electrolysis techniques. MOE is totally carbon-free and produces no CO or CO2 - only O2 gas at the anode. This project is directed at assessing the technical feasibility of MOE at the bench scale while determining optimum values of MOE operating parameters. An inert anode will be identified and its ability to sustain oxygen evalution will be demonstrated.

  3. Feasibility study of heavy oil recovery in the Permian Basin (Texas and New Mexico)

    SciTech Connect (OSTI)

    Olsen, D.K.; Johnson, W.I.

    1993-05-01

    This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Permian Basin of West Texas and Southeastern New Mexico is made up of the Midland, Delaware, Val Verde, and Kerr Basins; the Northwestern, Eastern, and Southern shelves; the Central Basin Platform, and the Sheffield Channel. The present day Permian Basin was one sedimentary basin until uplift and subsidence occurred during Pennsylvanian and early Permian Age to create the configuration of the basins, shelves, and platform of today. The basin has been a major light oil producing area served by an extensive pipeline network connected to refineries designed to process light sweet and limited sour crude oil. Limited resources of heavy oil (10`` to 20`` API gravity) occurs in both carbonate and sandstone reservoirs of Permian and Cretaceous Age. The largest cumulative heavy oil production comes from fluvial sandstones of the Cretaceous Trinity Group. Permian heavy oil is principally paraffinic and thus commands a higher price than asphaltic California heavy oil. Heavy oil in deeper reservoirs has solution gas and low viscosity and thus can be produced by primary and by waterflooding. Because of the nature of the resource, the Permian Basin should not be considered a major heavy oil producing area.

  4. Feasibility study of heavy oil recovery in the Permian Basin (Texas and New Mexico)

    SciTech Connect (OSTI)

    Olsen, D.K.; Johnson, W.I.

    1993-05-01

    This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Permian Basin of West Texas and Southeastern New Mexico is made up of the Midland, Delaware, Val Verde, and Kerr Basins; the Northwestern, Eastern, and Southern shelves; the Central Basin Platform, and the Sheffield Channel. The present day Permian Basin was one sedimentary basin until uplift and subsidence occurred during Pennsylvanian and early Permian Age to create the configuration of the basins, shelves, and platform of today. The basin has been a major light oil producing area served by an extensive pipeline network connected to refineries designed to process light sweet and limited sour crude oil. Limited resources of heavy oil (10'' to 20'' API gravity) occurs in both carbonate and sandstone reservoirs of Permian and Cretaceous Age. The largest cumulative heavy oil production comes from fluvial sandstones of the Cretaceous Trinity Group. Permian heavy oil is principally paraffinic and thus commands a higher price than asphaltic California heavy oil. Heavy oil in deeper reservoirs has solution gas and low viscosity and thus can be produced by primary and by waterflooding. Because of the nature of the resource, the Permian Basin should not be considered a major heavy oil producing area.

  5. Study of feasible and sustainable multilateral approach on nuclear fuel cycle

    SciTech Connect (OSTI)

    Kuno, Y.; Tazaki, M.; Akiba, M.; Takashima, R.; Izumi, Y.; Tanaka, S.

    2013-07-01

    Despite the Fukushima accident it is undeniable that nuclear power remains one of the most important methods to handle global growth of economic/energy consumption and issues with greenhouse gases. If the demand for nuclear power increases, the demand for not only the generation of power but also for refining uranium (U), conversion, enrichment, re-conversion, and fuel manufacturing should increase. In addition, concerns for the proliferation of 'Sensitive Nuclear Technologies' (SNT) should also increase. We propose a demand-side approach, where nuclear fuel cycle (NFC) activities would be implemented among multiple states. With this approach, NFC services, in particular those using SNTs, are multilaterally executed and controlled, thereby preventing unnecessary proliferation of SNTs, and enabling safe and appropriate control of nuclear technologies and nuclear materials. This proposal would implement nuclear safety and security at an international level and solve transport issues for nuclear fuels. This proposal is based on 3 types of cooperation for each element of NFC: type A: cooperation for 3S only, services received; Type B: cooperation for 3S, MNA (Multilateral Nuclear Activities) without transfer of ownership to MNA; and Type C cooperation for 3S, MNA holding ownership rights. States involved in the 3 types of activity should be referred to as partner states, host states, and site states respectively. The feasibility of the proposal is discussed for the Asian region.

  6. Feasibility study of volumetric modulated arc therapy with constant dose rate for endometrial cancer

    SciTech Connect (OSTI)

    Yang, Ruijie; Wang, Junjie; Xu, Feng; Li, Hua; Zhang, Xile

    2013-10-01

    To investigate the feasibility, efficiency, and delivery accuracy of volumetric modulated arc therapy with constant dose rate (VMAT-CDR) for whole-pelvic radiotherapy (WPRT) of endometrial cancer. The nine-field intensity-modulated radiotherapy (IMRT), VMAT with variable dose-rate (VMAT-VDR), and VMAT-CDR plans were created for 9 patients with endometrial cancer undergoing WPRT. The dose distribution of planning target volume (PTV), organs at risk (OARs), and normal tissue (NT) were compared. The monitor units (MUs) and treatment delivery time were also evaluated. For each VMAT-CDR plan, a dry run was performed to assess the dosimetric accuracy with MatriXX from IBA. Compared with IMRT, the VMAT-CDR plans delivered a slightly greater V{sub 20} of the bowel, bladder, pelvis bone, and NT, but significantly decreased the dose to the high-dose region of the rectum and pelvis bone. The MUs decreased from 1105 with IMRT to 628 with VMAT-CDR. The delivery time also decreased from 9.5 to 3.2 minutes. The average gamma pass rate was 95.6% at the 3%/3 mm criteria with MatriXX pretreatment verification for 9 patients. VMAT-CDR can achieve comparable plan quality with significant shorter delivery time and smaller number of MUs compared with IMRT for patients with endometrial cancer undergoing WPRT. It can be accurately delivered and be an alternative to IMRT on the linear accelerator without VDR capability.

  7. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 4. Appendix F

    SciTech Connect (OSTI)

    1995-09-01

    This section contains ecotoxicological profiles for the COPECs for the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The ecotoxicological information is presented for only those endpoints for which the chemicals are COPECs. The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

  8. Remedial investigation/feasibility study for the Clinch River/Poplar Creek operable unit. Volume 1. Main text

    SciTech Connect (OSTI)

    1995-09-01

    This is the combined Remedial Investigation/Feasibility Study Report for the Clinch River/Poplar Crack (CR/PC) Operable Unit (OU). The CR/PC OU is located in Anderson and Roane Counties, Tennessee and consists of the Clinch River and several of its embayments in Melton Hill and Watts Bar Reservoirs. These waters have received hazardous substances released over a period of 50 years from the US Department of Energy`s Oak Ridge Reservation (ORR), a National Priority List site established under the Comprehensive Environmental Response, Compensation, and Liability Act. A remedial investigation has been conducted to determine the current nature and extent of any contamination and to assess the resulting risk to human health and the environment. The feasibility study evaluates remedial action alternatives to identify any that are feasible for implementation and that would effectively reduce risk. Historical studies had indicated that current problems would likely include {sup 137}Cs in sediment of the Clinch River, mercury in sediment and fish of Poplar Creek and PCBs and pesticides in fish from throughout the OU. Peak releases of mercury and {sup 137}Cs occurred over 35 years ago, and current releases are low. Past releases of PCBs from the ORR are poorly quantified, and current releases are difficult to quantify because levels are so low. The site characterization focused on contaminants in surface water, sediment, and biota. Contaminants in surface water were all found to be below Ambient Water Quality Criteria. Other findings included the following: elevated metals including cesium 137 and mercury in McCoy Branch sediments; PCBs and chlordane elevated in several fish species, presenting the only major human health risk, significant ecological risks in Poplar Creek but not in the Clinch River.

  9. Community Renewable Energy Feasibility Fund Program

    Broader source: Energy.gov [DOE]

    The Oregon Department of Energy (ODOE) provides grants for feasibility studies for renewable energy, heat, and fuel projects under the Community Renewable Energy Feasibility Fund (CREFF). This...

  10. 14-plex Feasibility Report

    SciTech Connect (OSTI)

    Kotongan, Victoria Hazel

    2013-06-21

    The Native Village of Unalakleet project was a feasibility study for a retrofit of a “tribally owned” three story, 14 apartment complex located in Unalakleet, Alaska. The program objective and overall goal was to create a plan for retrofitting to include current appraised value and comparable costs of new construction to determine genuine feasibility as low-income multi-family housing for tribal members.

  11. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Santo Domingo Pueblo in Sandoval County, New Mexico

    SciTech Connect (OSTI)

    Geiger, J.; Lisell, L.; Mosey, G.

    2013-07-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Pueblo of Santo Domingo in Sandoval County, New Mexico, for a renewable energy production feasibility study. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess specific areas on the Pueblo for potential installation of photovoltaic (PV) systems and to estimate the cost, performance, and site impacts of different PV options. The report also recommends financing options that could assist in the implementation of these PV systems.

  12. Feasibility study of heavy oil recovery in the Midcontinent region (Kansas, Missouri, Oklahoma)

    SciTech Connect (OSTI)

    Olsen, D.K.; Johnson, W.I.

    1993-08-01

    This report is one of a series of publications assessing the feasibility/constraints of increasing domestic heavy oil production. Each report covers a select area of the United States. The Midcontinent (Kansas, Nssouri, Oklahoma) has produced significant oil, but contrary to early reports, the area does not contain the huge volumes of heavy oil that, along with the development of steam and in situ combustion as oil production technologies, sparked the area`s oil boom of the 1960s. Recovery of this heavy oil has proven economically unfeasible for most operators due to the geology of the formations rather than the technology applied to recover the oil. The geology of the southern Midcontinent, as well as results of field projects using thermal enhanced oil recovery (TEOR) methods to produce the heavy oil, was examined based on analysis of data from secondary sources. Analysis of the performance of these projects showed that the technology recovered additional heavy oil above what was produced from primary production from the consolidated, compartmentalized, fluvial dominated deltaic sandstone formations in the Cherokee and Forest City basins. The only projects producing significant economic and environmentally acceptable heavy oil in the Midcontinent are in higher permeability, unconsolidated or friable, thick sands such as those found in south-central Oklahoma. There are domestic heavy oil reservoirs in other sedimentary basins that are in younger formations, are less consolidated, have higher permeability and can be economically produced with current TEOR technology. Heavy oil production from the carbonates of central and wester Kansas has not been adequately tested, but oil production is anticipated to remain low. Significant expansion of Midcontinent heavy oil production is not anticipated because the economics of oil production and processing are not favorable.

  13. Feasibility study of heavy oil recovery in the Appalachian, Black Warrior, Illinois, and Michigan basins

    SciTech Connect (OSTI)

    Olsen, D.K.; Rawn-Schatzinger, V.; Ramzel, E.B.

    1992-07-01

    This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Appalachian, Black Warrior, Illinois, and Michigan basins cover most of the depositional basins in the Midwest and Eastern United States. These basins produce sweet, paraffinic light oil and are considered minor heavy oil (10{degrees} to 20{degrees} API gravity or 100 to 100,000 cP viscosity) producers. Heavy oil occurs in both carbonate and sandstone reservoirs of Paleozoic Age along the perimeters of the basins in the same sediments where light oil occurs. The oil is heavy because escape of light ends, water washing of the oil, and biodegradation of the oil have occurred over million of years. The Appalachian, Black Warrior, Illinois, and Michigan basins' heavy oil fields have produced some 450,000 bbl of heavy oil of an estimated 14,000,000 bbl originally in place. The basins have been long-term, major light-oil-producing areas and are served by an extensive pipeline network connected to refineries designed to process light sweet and with few exceptions limited volumes of sour or heavy crude oils. Since the light oil is principally paraffinic, it commands a higher price than the asphaltic heavy crude oils of California. The heavy oil that is refined in the Midwest and Eastern US is imported and refined at select refineries. Imports of crude of all grades accounts for 37 to >95% of the oil refined in these areas. Because of the nature of the resource, the Appalachian, Black Warrior, Illinois and Michigan basins are not expected to become major heavy oil producing areas. The crude oil collection system will continue to degrade as light oil production declines. The demand for crude oil will increase pipeline and tanker transport of imported crude to select large refineries to meet the areas' liquid fuels needs.

  14. Feasibility study of heavy oil recovery in the Appalachian, Black Warrior, Illinois, and Michigan basins

    SciTech Connect (OSTI)

    Olsen, D.K.; Rawn-Schatzinger, V.; Ramzel, E.B.

    1992-07-01

    This report is one of a series of publications assessing the feasibility of increasing domestic heavy oil production. Each report covers select areas of the United States. The Appalachian, Black Warrior, Illinois, and Michigan basins cover most of the depositional basins in the Midwest and Eastern United States. These basins produce sweet, paraffinic light oil and are considered minor heavy oil (10{degrees} to 20{degrees} API gravity or 100 to 100,000 cP viscosity) producers. Heavy oil occurs in both carbonate and sandstone reservoirs of Paleozoic Age along the perimeters of the basins in the same sediments where light oil occurs. The oil is heavy because escape of light ends, water washing of the oil, and biodegradation of the oil have occurred over million of years. The Appalachian, Black Warrior, Illinois, and Michigan basins` heavy oil fields have produced some 450,000 bbl of heavy oil of an estimated 14,000,000 bbl originally in place. The basins have been long-term, major light-oil-producing areas and are served by an extensive pipeline network connected to refineries designed to process light sweet and with few exceptions limited volumes of sour or heavy crude oils. Since the light oil is principally paraffinic, it commands a higher price than the asphaltic heavy crude oils of California. The heavy oil that is refined in the Midwest and Eastern US is imported and refined at select refineries. Imports of crude of all grades accounts for 37 to >95% of the oil refined in these areas. Because of the nature of the resource, the Appalachian, Black Warrior, Illinois and Michigan basins are not expected to become major heavy oil producing areas. The crude oil collection system will continue to degrade as light oil production declines. The demand for crude oil will increase pipeline and tanker transport of imported crude to select large refineries to meet the areas` liquid fuels needs.

  15. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1: Main text

    SciTech Connect (OSTI)

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  16. Hierarchical EMS/SCADA system, Magyar Villamos Muevek Ttroeszt, Hungarian Electricity Board, feasibility study report. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    The report concludes a feasibility and requirements study for the Hungarian Eectricity Board (MVMT) to upgrade MVMT's nationwide, hierarchical Energy Management System/Supervisory Control and Data Acquisition (EMS/SCADA) system. The study has resulted in a time-phased implementation plan for the recommended cost-effective solutions, with the associated project schedules and budgetary cost estimates. Specific recommendations are presented for the following closely related implementation projects: The upgrading of an existing EMS in the National Dispatch Center (NDC) including the associated remote facilities at major substations and power plants; The modernization or replacement of the existing SCADA systems and/or implementation of new systems at the regional electric power companies; and The expansion and upgrading of the data communication network that will be required to connect and support the nationwide EMS/SCADA facilities.

  17. Feasibility/alternatives study for the planned replacement of Nuclear Material Safeguards System (NMSS)

    SciTech Connect (OSTI)

    McBride, K.C.; Russell, V.K.

    1994-10-04

    This document is a study which describes the NMSS replacement alternatives and provides recommended solutions. It also describes a NMSS Paradox prototype.

  18. Feasibility Study for Evaluating Cumulative Exposure of Downstream Migrant Juvenile Salmonids to Total Dissolved Gas. Final Report 1996.

    SciTech Connect (OSTI)

    Abernethy, C.Scott; Dauble, Dennis D.; Johnson, Robert L.

    1997-11-01

    A feasibility study was initiated to determine if downstream migrant salmonids could be monitored to determine potential relationships between total dissolved gas (TDG) exposure and signs of gas bubble trauma (GBT). The primary objectives were to: (1) establish logistical requirements for in-river monitoring of TDG exposure, including net pen design, deployment, and navigation constraints; (2) resolve uncertainties associated with effects of the net pen on fish behavior; (3) test the accuracy and precision of in-river monitoring equipment used to measure fish distribution and water quality; and (4) determine the application of hydrologic/flow models to predictions of TDG exposure. In-river measurements included water velocity, boat position, and selected water quality parameters (temperature, dissolved oxygen, pH, depth, conductivity). Fish distribution within the net pen was monitored using scanning sonar, and a split-beam echo sounder was used to evaluate vertical distribution of fish m in the river adjacent to the net pen. Three test drifts were conducted from late July through late August. The studies demonstrated that it was feasible to assemble and deploy a large net pen for mobile monitoring of TDG exposure. Accurate monitoring of vertical and lateral distribution of smolts was performed, and diel differences in behavior were documented. Further, the fish sounded in response to researcher activity on the perimeter platform. Thus, in-transit monitoring for GBT or mortality would affect fish depth distribution and exposure to TDG. Principal recommendations for future studies are directed at improving maneuverability of the net pen in adverse weather conditions and applying new acoustics technology to simultaneously collect fish distribution data from within and outside of the pen. 6 refs., 17 figs., 2 tabs.

  19. Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings

    SciTech Connect (OSTI)

    none,

    2011-06-01

    Presents the results of a scoping study to assess the need for national databases that can support best practices in energy efficiency program evaluation, measurement, and verification (EM&V).

  20. Feasibility study for a recirculating linac-based facility for femtosecond dynamics

    SciTech Connect (OSTI)

    Corlett, J.N.; Barry, W.; Barletta, W.A.; Byrd, J.M.; DeSantis, S.; Doolittle, L.; Fawley, W.; Green, M.A.; Hartman, N.; Heimann, P.; Kairan, D.; Kujawski, E.; Li, D.; Lidia, S.; Luft, P.; McClure, R.; Parmigiani, F.; Petroff, Y.; Pirkl, W.; Placidi, M.; Reavill, D.; Reichel, I.; Rimmer, R.A.; Ratti, A.; Robinson, K.E.; Sannibale, F.; Schoenlein, R.; Staples, J.; Tanabe, J.; Truchlikova, D.; Wan, W.; Wang, S.; Wells, R.; Wolski, A.; Zholents, A.

    2002-12-21

    LBNL is pursuing design studies and the scientific program for a facility dedicated to the production of x-ray pulses with ultra-short time duration, for application in dynamical studies of processes in physics, biology, and chemistry. The proposed x-ray facility has the short x-ray pulse length ({approx}60 fs FWHM) necessary to study very fast dynamics, high flux (up to approximately 10E11 photons/sec/0.1 percentBW) to study weakly scattering systems, and tuneability over 1-12 keV photon energy. The hard x-ray photon production section of the machine accommodates seven 2-m long undulators. Design studies for longer wavelength sources, using high-gain harmonic generation, are in progress. The x-ray pulse repetition rate of 10 kHz is matched to studies of dynamical processes (initiated by ultra-short laser pulses) that typically have a long recovery time or are not generally cyclic or reversible and need time to allow relaxation, replacement, or flow of the sample. The technique for producing ultra-short x-ray pulses uses relatively long electron bunches to minimize high-peak-current collective effects, and the ultimate x-ray duration is achieved by a combination of bunch manipulation and optical compression. Synchronization of x-ray pulses to sample excitation signals is expected to be of order 50 - 100 fs. Techniques for making use of the recirculating geometry to provide beam-based signals from early passes through the machine are being studied.

  1. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  2. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  3. Northern Adriatic LNG receiving terminal: Pre-feasibility study. Part 1. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1991-03-19

    The study evaluated 2 potential sites as the location for a Liquefied Natural Gas (LNG) receiving terminal. The study assumed that the LNG will be obtained in Algeria and transported, via liquefied gas carriers, to either Koper or Omisalj, located on the Northern Adriatic coast of Yugoslavia. The proposed terminal will provide natural gas, via pipeline, to Austria, Czechoslovakia, Hungary and Yugoslavia. The goal of the study was to determine specific transportation and processing costs, per cubic meter of gas, at each delivery station in Yugoslavia and at the respective custody transfer points. Consideration has been given to the overall costs for construction, maintenance and operation, as well as marine transport for the gas and capital equipment of the system.

  4. Feasibility Study of Economics and Performance of Solar Photovoltaics in Nitro, West Virginia

    SciTech Connect (OSTI)

    Lisell, L.; Mosey, G.

    2010-08-01

    The study described in this report assessed brownfield sites designated by the City of Nitro, West Virginia for solar photovoltaic (PV) installations. The study analyzed three different types of PV systems for eight sites. The report estimates the cost, performance, and site impacts of thin film technology and crystalline silicon panels (both fixed-axis tracking and single-axis tracking systems). Potential job creation and electrical rate increases were also considered, and the report recommends financing options that could assist in the implementation of a system.

  5. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 1, main text

    SciTech Connect (OSTI)

    1996-03-01

    This document is the combined Remedial Investigation/Feasibility Study (RI/FS) Report for the Clinch River/Poplar Creek Operable Unit (CR/PC OU), an off-site OU associated with environmental restoration activities at the U.S. Department of Energy (DOE) Oak Ridge Reservation (ORR). As a result of past, present, and potential future releases of hazardous substances into the environment, the ORR was placed on the National Priorities List in December 1989 (54 FR 48184). Sites on this list must be investigated for possible remedial action, as required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, 42 U.S.C. 9601, et seq.). This report documents the findings of the remedial investigation of this OU and the feasibility of potential remedial action alternatives. These studies are authorized by Sect. 117 of CERCLA and were conducted in accordance with the requirements of the National Contingency Plan (40 CFR Part 300). DOE, the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC) have entered into a Federal Facility Agreement (FFA), as authorized by Sect. 120 of CERCLA and Sects. 3008(h) and 6001 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6901, et seq.). The purpose of this agreement is to ensure a coordinated and effective response for all environmental restoration activities occurring at the ORR. In addition to other responsibilities, the FFA parties mutually define the OU boundaries, set remediation priorities, establish remedial investigation priorities and strategies, and identify and select remedial actions. A copy of this FFA is available from the DOE Information Resource Center in Oak Ridge, Tennessee.

  6. Remediation of heavy-metal-contaminated soil using chelant extraction: Feasibility studies

    SciTech Connect (OSTI)

    Peters, R.W.; Miller, G.; Taylor, J.D.; Schneider, J.F.; Zellmer, S.; Edgar, D.E.; Johnson, D.O.

    1993-08-01

    Results are presented of a laboratory investigation conducted to determine the efficacy of using chelating agents to extract heavy metals (Pb, Cd, Cr, Ba, Cu, and Zn) from soil, the primary focus being on the extraction of lead from the soil. Results from the batch-shaker studies and emphasizes the columnar extraction studies are described. The chelating agents studied included ethylenediaminetetraacetic acid (EDTA) and citric acid, in addition to water. Concentrations of the chelants ranged from 0.01 to 0.05 M; the suspension pH was varied between 3 and 8. Results showed that the removal of lead using citric acid and water was somewhat pH-dependent. For the batch-shaker studies, the results indicated that EDTA was more effective at removing Cd, Cu, Pb, and Zn than was citric acid (both present at 0.01 M). EDTA and citric acid were equally effective in mobilizing Cr and Ba from the soil. Heavy metals removal was slightly more effective in the more acidic region (pH {le} 5).

  7. Feasibility Study of Secondary Heat Exchanger Concepts for the Advanced High Temperature Reactor

    SciTech Connect (OSTI)

    Piyush Sabharwall

    2011-09-01

    The work reported herein represents a significant step in the preliminary design of heat exchanger options (material options, thermal design, selection and evaluation methodology with existing challenges). The primary purpose of this study is to aid in the development and selection of the required heat exchanger for power production using either a subcritical or supercritical Rankine cycle.

  8. Feasibility Study of a Nuclear-Stirling Power Plant for the Jupiter Icy Moons Orbiter

    SciTech Connect (OSTI)

    Schmitz, Paul C.; Schreiber, Jeffrey G.; Penswick, L. Barry

    2005-02-06

    NASA is undertaking the design of a new spacecraft to explore the planet Jupiter and its three moons Calisto, Ganymede and Europa. This proposed mission, known as Jupiter Icy Moons Orbiter (JIMO) would use a nuclear reactor and an associated electrical generation system (Reactor Power Plant - RPP) to provide power to the spacecraft. The JIMO spacecraft is envisioned to use this power for science and communications as well as Electric Propulsion (EP). Among other potential power-generating concepts, previous studies have considered Thermoelectric and Brayton power conversion systems, coupled to a liquid metal reactor for the JIMO mission. This paper will explore trades in system mass and radiator area for a nuclear reactor power conversion system, however this study will focus on Stirling power conversion. Stirling convertors have a long heritage operating in both power generation and the cooler industry, and are currently in use in a wide variety of applications. The Stirling convertor modeled in this study is based upon the Component Test Power Convertor design that was designed and operated successfully under the Civil Space Technology Initiative for use with the SP-100 nuclear reactor in the 1980's and early 1990's. The baseline RPP considered in this study consists of four dual-opposed Stirling convertors connected to the reactor by a liquid lithium loop. The study design is such that two of the four convertors would operate at any time to generate the 100 kWe while the others are held in reserve. For this study the Stirling convertors hot-side temperature is 1050 K, would operate at a temperature ratio of 2.4 for a minimum mass system and would have a system efficiency of 29%. The Stirling convertor would generate high voltage (400 volt), 100 Hz single phase AC that is supplied to the Power Management and Distribution system. The waste heat is removed from the Stirling convertors by a flowing liquid sodium-potassium eutectic and then rejected by a shared radiator. The radiator consists of two coplanar wings, which would be deployed after the reactor is in space. For this study design, the radiators would be located behind the conical radiation shield of the reactor and fan out as the radiator's distance from the reactor increases. System trades were performed to vary cycle state point temperatures and convertor design as well as power output. Other redundancy combinations were considered to understand the affects of convertor size and number of spares to the system mass.

  9. Modeling and Simulation Optimization and Feasibility Studies for the Neutron Detection without Helium-3 Project

    SciTech Connect (OSTI)

    Ely, James H.; Siciliano, Edward R.; Swinhoe, Martyn T.; Lintereur, Azaree T.

    2013-01-01

    This report details the results of the modeling and simulation work accomplished for the ‘Neutron Detection without Helium-3’ project during the 2011 and 2012 fiscal years. The primary focus of the project is to investigate commercially available technologies that might be used in safeguards applications in the relatively near term. Other technologies that are being developed may be more applicable in the future, but are outside the scope of this study.

  10. A Feasibility Study. Ductless Hydronic Distribution Systems with Fan Coil Delivery

    SciTech Connect (OSTI)

    Springer, D.; Dakin, B.; Backman, C.

    2012-07-01

    The primary objectives of this study are to estimate potential energy savings relative to conventional ducted air distribution, and to identify equipment requirements, costs, and barriers with a focus on ductless hydronic delivery systems that utilize water-to-air terminal units in each zone. Results indicate that annual heating and cooling energy use can be reduced by up to 27% assuming replacement of the conventional 13 SEER heat pump and coil with a similarly rated air-to-water heat pump.

  11. Final Project Report, Bristol Bay Native Corporation Wind and Hydroelectric Feasibility Study

    SciTech Connect (OSTI)

    Vaught, Douglas J.

    2007-03-31

    The Bristol Bay Native Corporation (BBNC) grant project focused on conducting nine wind resource studies in eight communities in the Bristol Bay region of southwest Alaska and was administered as a collaborative effort between BBNC, the Alaska Energy Authority, Alaska Village Electric Cooperative, Nushagak Electric Cooperative (NEC), Naknek Electric Association (NEA), and several individual village utilities in the region. BBNCs technical contact and the project manager for this study was Douglas Vaught, P.E., of V3 Energy, LLC, in Eagle River, Alaska. The Bristol Bay region of Alaska is comprised of 29 communities ranging in size from the hub community of Dillingham with a population of approximately 3,000 people, to a few Native Alaska villages that have a few tens of residents. Communities chosen for inclusion in this project were Dillingham, Naknek, Togiak, New Stuyahok, Kokhanok, Perryville, Clarks Point, and Koliganek. Selection criteria for conduction of wind resource assessments in these communities included population and commercial activity, utility interest, predicted Class 3 or better wind resource, absence of other sources of renewable energy, and geographical coverage of the region. Beginning with the first meteorological tower installation in October 2003, wind resource studies were completed at all sites with at least one year, and as much as two and a half years, of data. In general, the study results are very promising for wind power development in the region with Class 6 winds measured in Kokhanok; Class 4 winds in New Stuyahok, Clarks Point, and Koliganek; Class 3 winds in Dillingham, Naknek, and Togiak; and Class 2 winds in Perryville. Measured annual average wind speeds and wind power densities at the 30 meter level varied from a high of 7.87 meters per second and 702 watts per square meter in Kokhanok (Class 6 winds), to a low of 4.60 meters per second and 185 watts per square meter in Perryville (Class 2 winds).

  12. LOCA feasibility study of Almaraz NPP 110% power up-rate

    SciTech Connect (OSTI)

    Orive, Raul; Gallego, Ines; Garcia, Pablo; Concejal, Alberto; Martinez-Murillo, Juan-Carlos

    2006-07-01

    Knowledge about accidents and fuel response in extreme conditions has progressed in parallel with the simulation tools development and consequently results are today highly satisfactory. This fact allows nuclear power plants (NPP) to carry out optimization processes of its operation and yield improvements due to the development of new methodologies and tools. Power up-rates open a demand in areas like the analyses of Loss Of Coolant Accidents (LOCA's), which impact on plant design may limit the maximum operation power in a nuclear power plant. TRAC-PF1 is a thermal-hydraulic calculation code that allows the complete treatment of two-phase flows in balance, combining a three dimensional vessel, that simulates in detail the accident phenomena, with one dimensional components. TRAC-PF1 code capacities in the reproduction of experiments, transients and accidents have been widely proved. IBERINCO has modified the original code to develop a conservative model applicable to a 3-loop Westinghouse NPP. These circumstances have allowed Almaraz NPP to get deeper in the study of the plant behaviour during a LOCA, after a hypothetical Power Up-rate. The scope of the study includes the development of the plant model and the reproduction of several accidents with loss of coolant. These accidents have been simulated with the improved option and the conservative version of the modified code (TRAC-PF1/IBER). The limiting case at the current power is analyzed in 110% Power Up-rate conditions and different sensitivity studies are performed, focused in impact of axial power distribution, discharge coefficients and emergency core cooling system availability. These studies allow to verify the effectiveness of Almaraz NPP safety systems in LOCA scenarios to guarantee the required safety margins. (authors)

  13. Feasibility Study of Carbon Sequestration Through Reforestation in the Chesapeake Bay Watershed of Virginia

    SciTech Connect (OSTI)

    Andy Lacatell; David Shoch; Bill Stanley; Zoe Kant

    2007-03-01

    The Chesapeake Rivers conservation area encompasses approximately 2,000 square miles of agricultural and forest lands in four Virginia watersheds that drain to the Chesapeake Bay. Consulting a time series of classified Landsat imagery for the Chesapeake Rivers conservation area, the project team developed a GIS-based protocol for identifying agricultural lands that could be reforested, specifically agricultural lands that had been without forest since 1990. Subsequent filters were applied to the initial candidate reforestation sites, including individual sites > 100 acres and sites falling within TNC priority conservation areas. The same data were also used to produce an analysis of baseline changes in forest cover within the study period. The Nature Conservancy and the Virginia Department of Forestry identified three reforestation/management models: (1) hardwood planting to establish old-growth forest, (2) loblolly pine planting to establish working forest buffer with hardwood planting to establish an old-growth core, and (3) loblolly pine planting to establish a working forest. To assess the relative carbon sequestration potential of these different strategies, an accounting of carbon and total project costs was completed for each model. Reforestation/management models produced from 151 to 171 tons carbon dioxide equivalent per acre over 100 years, with present value costs of from $2.61 to $13.28 per ton carbon dioxide equivalent. The outcome of the financial analysis was especially sensitive to the land acquisition/conservation easement cost, which represented the most significant, and also most highly variable, single cost involved. The reforestation/management models explored all require a substantial upfront investment prior to the generation of carbon benefits. Specifically, high land values represent a significant barrier to reforestation projects in the study area, and it is precisely these economic constraints that demonstrate the economic additionality of any carbon benefits produced via reforestation--these are outcomes over and above what is currently possible given existing market opportunities. This is reflected and further substantiated in the results of the forest cover change analysis, which demonstrated a decline in area of land in forest use in the study area for the 1987/88-2001 period. The project team collected data necessary to identify sites for reforestation in the study area, environmental data for the determining site suitability for a range of reforestation alternatives and has identified and addressed potential leakage and additionality issues associated with implementing a carbon sequestration project in the Chesapeake Rivers Conservation Area. Furthermore, carbon emissions reductions generated would have strong potential for recognition in existing reporting systems such as the U.S. Department of Energy 1605(b) voluntary reporting requirements and the Chicago Climate Exchange. The study identified 384,398 acres on which reforestation activities could potentially be sited. Of these candidate sites, sites totaling 26,105 acres are an appropriate size for management (> 100 acres) and located in priority conservation areas identified by The Nature Conservancy. Total carbon sequestration potential of reforestation in the study area, realized over a 100 year timeframe, ranges from 58 to 66 million tons of carbon dioxide equivalent, and on the priority sites alone, potential for carbon sequestration approaches or exceeds 4 million tons of carbon dioxide equivalent. In the absence of concerted reforestation efforts, coupled with policy strategies, the region will likely face continued declines in forest land.

  14. Feasibility study on Thailand LNG project. Final report. Volume 1. Executive summary. Export trade information

    SciTech Connect (OSTI)

    1995-08-01

    This study, conducted by Bechtel, was funded by the U.S. Trade and Development Agency. The report specifically addresses an LNG terminal and associated gas pipeline, the crude oil pipeline component of the Southern Seaboard project, in addition to a power plant which uses a portion of the gas. Volume I, the Final Report, is divided into the following sections: Executive Summary; (1.0) Introduction; (2.0) Design Basis; (3.0) Analysis; (4.0) System Definition; (5.0) Implementation; (6.0) Schedule; (7.0) Economics; (8.0) Recommendations.

  15. Feasibility study on Thailand LNG project. Final report. Volume 2. Appendix. Export trade information

    SciTech Connect (OSTI)

    1995-08-01

    This study, conducted by Bechtel, was funded by the U.S. Trade and Development Agency. The report specifically addresses an LNG terminal and associated gas pipeline, the crude oil pipeline component of the Southern Seaboard project, in addition to a power plant which uses a portion of the gas. Volume II contains the Appendix and is divided into the following sections: (1.0) PTT Data; (2.0) Design Criteria; (3.0) Khao Bo Ya Soils Data; (4.0) Khao Bo Ya Oceanographic Data; (5.0) Thailand Seismic Data; (6.0) Risk Assessment; (7.0) Equipment Lists; (8.0) Equipment Data Sheets; (9.0) Drawings; (10.0) Cost Data; (11.0) Calculations; (12.0) Terms of Reference.

  16. Advanced Turbine System (ATS): Task 1, System scoping and feasibility study. Final report

    SciTech Connect (OSTI)

    van der Linden, S.

    1993-02-01

    Present GT(Gas Turbine) Systems are available to achieve 52% (LHV) thermal efficiencies, plants in construction will be capable of 54%, and the goal of this study is to identify incentives, technical issues, and resource requirements to develop natural gas-and coal-compatible ATS which would have a goal of 60% or greater based on LHV. The prime objective of this project task is to select a natural gas-fired ATS (Advanced Turbine System) that could be manufactured and marketed should development costs not be at issue with the goals of: (1) Coal of electricity 10% below 1991 vintage power plants in same market class and size. (2) Expected performance 60% efficiency and higher, (3) Emission levels, NO{sub x} < 10 ppM (0.15 lb/MW-h), CO < 20 ppM (0.30 lb/MW-h), and UHC < 20 ppM (0.30 lb/MW-h). ABB screening studies have identified the gas-fueled combined cycle as the most promising full scale solution to achieve the set goals for 1988--2002. This conclusion is based on ABB`s experience level, as well as the multi-step potential of the combined cycle process to improve in many component without introducing radical changes that might increase costs and lower RAM. The technical approach to achieve 60% or better thermal efficiency will include increased turbine inlet temperatures, compressor intercooling, as well a improvements in material, turbine cooling technology and the steam turbine. Use of improved component efficiencies will achieve gas-fired cycle performance of 61.78%. Conversion to coal-firing will result in system performance of 52.17%.

  17. Advanced Turbine System (ATS): Task 1, System scoping and feasibility study

    SciTech Connect (OSTI)

    van der Linden, S.

    1993-02-01

    Present GT(Gas Turbine) Systems are available to achieve 52% (LHV) thermal efficiencies, plants in construction will be capable of 54%, and the goal of this study is to identify incentives, technical issues, and resource requirements to develop natural gas-and coal-compatible ATS which would have a goal of 60% or greater based on LHV. The prime objective of this project task is to select a natural gas-fired ATS (Advanced Turbine System) that could be manufactured and marketed should development costs not be at issue with the goals of: (1) Coal of electricity 10% below 1991 vintage power plants in same market class and size. (2) Expected performance 60% efficiency and higher, (3) Emission levels, NO[sub x] < 10 ppM (0.15 lb/MW-h), CO < 20 ppM (0.30 lb/MW-h), and UHC < 20 ppM (0.30 lb/MW-h). ABB screening studies have identified the gas-fueled combined cycle as the most promising full scale solution to achieve the set goals for 1988--2002. This conclusion is based on ABB's experience level, as well as the multi-step potential of the combined cycle process to improve in many component without introducing radical changes that might increase costs and lower RAM. The technical approach to achieve 60% or better thermal efficiency will include increased turbine inlet temperatures, compressor intercooling, as well a improvements in material, turbine cooling technology and the steam turbine. Use of improved component efficiencies will achieve gas-fired cycle performance of 61.78%. Conversion to coal-firing will result in system performance of 52.17%.

  18. Lower Brule Sioux Tribe Wind-Pump Storage Feasibility Study Project

    SciTech Connect (OSTI)

    Shawn A. LaRoche; Tracey LeBeau; Innovation Investments, LLC

    2007-04-20

    The Lower Brule Sioux Tribe is a federally recognized Indian tribe organized pursuant to the 1934 Wheeler-Howard Act (“Indian Reorganization Act”). The Lower Brule Sioux Indian Reservation lies along the west bank of Lake Francis Case and Lake Sharpe, which were created by the Fort Randall and Big Bend dams of the Missouri River pursuant to the Pick Sloan Act. The grid accessible at the Big Bend Dam facility operated by the U.S. Army Corps of Engineers is less than one mile of the wind farm contemplated by the Tribe in this response. The low-head hydroelectric turbines further being studied would be placed below the dam and would be turned by the water released from the dam itself. The riverbed at this place is within the exterior boundaries of the reservation. The low-head turbines in the tailrace would be evaluated to determine if enough renewable energy could be developed to pump water to a reservoir 500 feet above the river.

  19. Feasibility/treatability studies for removal of heavy metals from training range soils at the Grafenwoehr Training Area, Germany

    SciTech Connect (OSTI)

    Peters, R.W.

    1995-05-01

    A feasibility/treatability study was performed to investigate the leaching potential of heavy metals (particularly lead) from soils at the Grafenw6hr Training Area (GTA) in Germany. The study included an evaluation of the effectiveness of chelant extraction to remediate the heavy-metal-contarninated soils. Batch shaker tests indicated that ethylenediaminetetraacetic acid (EDTA) (0.01M) was more effective than citric acid (0.01M) at removing cadmium, copper, lead, and zinc. EDTA and citric acid were equally effective in mobilizing chromium and barium from the soil. The batch shaker technique with chelant extraction offers promise as a remediation technique for heavy-metal-contaninated soil at the GTA. Columnar flooding tests conducted as part of the study revealed that deionized water was the least effective leaching solution for mobilization of the heavy metals; the maximum solubilization obtained was 3.72% for cadmium. EDTA (0.05M) achieved the greatest removal of lead (average removal of 17.6%). The difficulty of extraction using deionized water indicates that all of the heavy metals are very tightly bound to the soil; therefore, they are very stable in the GTA soils and do not pose a serious threat to the groundwater system. Columnar flooding probably does not represent a viable remediation technique for in-situ cleanup of heavy-metal-contaminated soils at the GTA.

  20. Feasibility study for co-locating and integrating ethanol production plants from corn starch and lignocellulosic feedstocks

    SciTech Connect (OSTI)

    Wallace, Robert; Ibsen, Kelly; McAloon, Andrew; Yee, Winnie

    2005-01-01

    Analysis of the feasibility of co-locating corn-grain-to-ethanol and lignocellulosic ethanol plants and potential savings from combining utilities, ethanol purification, product processing, and fermentation.

  1. Technical/economical feasibility study for the Apex Oil Company alcohol/gasohol plant near Carville, Louisiana

    SciTech Connect (OSTI)

    Not Available

    1981-01-01

    The results of a study conducted to determine the feasibility of constructing and operating a 33 million gallon-per-year ethanol plant in Carville, Louisiana are presented. Under current market conditions the 33 million gallon per year ethanol plant under consideration by Apex at its Carville, Louisiana site does not appear to be attractive at this time. There are five major factors which contribute to this outcome: (1) the market for ethanol/gasohol is not developed to the point where there is sufficient demand to assure full plant utilization in the near future; (2) the price required to provide a reasonable rate of return is 80 cents per barrel above the current estimated market clearing price of $1.50 per gallon; (3) the capital costs to construct a plant of this size has increased from $30 million at the onset of the study to $86 million; (4) Louisiana gasohol blending incentives cannot be assured since there is insufficient local feedstock production to meet the minimum import requirements; and (5) lack of participation by major oil companies in the gasohol program limits both the distribution and potential retail outlets for the product. Apex plans to place the project on hold pending satisfactory resolution of these items.

  2. Tomographic imaging of rock conditions ahead of mining using the shearer as a seismic source - A feasibility study

    SciTech Connect (OSTI)

    Luo, X.; King, A.; Van de Werken, M.

    2009-11-15

    Roof falls due to poor rock conditions in a coal longwall panel may threaten miner's life and cause significant interruption to mine production. There has been a requirement for technologies that are capable of imaging the rock conditions in longwall coal mining, ahead of the working face and without any interruption to production. A feasibility study was carried out to investigate the characteristics of seismic signals generated by the continuous coal cutter (shearer) and recorded by geophone arrays deployed ahead of the working face, for the purpose of seismic tomographic imaging of roof strata condition before mining. Two experiments were conducted at a coal mine using two arrays of geophones. The experiments have demonstrated that the longwall shearer generates strong and low-frequency (similar to 40 Hz) seismic energy that can be adequately detected by geophones deployed in shallow boreholes along the roadways as far as 300 m from the face. Using noise filtering and signal cross correlation techniques, the seismic arrival times associated with the shearer cutting can be reliably determined. It has proved the concept that velocity variations ahead of the face can be mapped out using tomographic techniques while mining is in progress.

  3. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington. Revision

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium-{sup 99}{Tc}-Nitrate multi-contaminant IRM plume identified beneath U Plant.

  4. Feasibility Study For Use Of Commercial Cask Vendor Dry Transfer Systems To Unload Used Fuel Assemblies In L-Area

    SciTech Connect (OSTI)

    Krementz, Dan; Rose, David; Dunsmuir, Mike

    2014-02-06

    The purpose of this study is to determine whether a commercial dry transfer system (DTS) could be used for loading or unloading used nuclear fuel (UNF) in L-Basin and to determine if a DTS pool adapter could be made for L-Basin Transfer Pit #2 that could accommodate a variety of DTS casks and fuel baskets or canisters up to 24 diameter.[1, 2] This study outlines the technical feasibility of accommodating different vendor dry transfer systems in the L-Basin Transfer Bay with a general work scope. It identifies equipment needing development, facility modifications, and describes the needed analyses and calculations. After reviewing the L-Basin Transfer Bay area layout and information on the only DTS system currently in use for the Nuclear Assurance Corporation Legal Weight Truck cask (NAC LWT), the authors conclude that use of a dry transfer cask is feasible. AREVA was contacted and acknowledged that they currently do not have a design for a dry transfer cask for their new Transnuclear Long Cask (TN-LC) cask. Nonetheless, this study accounted for a potential future DTS from AREVA to handle fuel baskets up to 18 in diameter. Due to the layout of the Transfer Bay, it was determined that a DTS cask pool adapter designed specifically for spanning Pit #2 and placed just north of the 70 Ton Cask lid lifting superstructure would be needed. The proposed pool adapter could be used to transition a fuel basket up to 24 in diameter and ~11 feet long from a dry transfer cask to the basin. The 18 and 24 applications of the pool adapter are pending vendor development of dry transfer casks that accommodate these diameters. Once a fuel basket has been lowered into Pit #2 through a pool adapter, a basket cart could be used to move the basket out from under the pool adapter for access by the 5 Ton Crane. The cost to install a dry transfer cask handling system in L-Area capable of handling multiple vendor provided transport and dry transfer casks and baskets with different diameters and lengths would likely be on the same order of magnitude as the Basin Modifications project. The cost of a DTS capability is affected by the number of design variations of different vendor transport and dry transfer casks to be considered for design input. Some costs would be incurred for each vendor DTS to be handled. For example, separate analyses would be needed for each dry transfer cask type such as criticality, shielding, dropping a dry transfer cask and basket, handling and auxiliary equipment, procedures, operator training, readiness assessments, and operational readiness reviews. A DTS handling capability in L-Area could serve as a backup to the Shielded Transfer System (STS) for unloading long casks and could support potential future missions such as the Idaho National Laboratory (INL) Exchange or transferring UNF from wet to dry storage.

  5. Geohydrologic feasibility study of the greater Green River Basin for the potential applicability of Jack W. McIntyre`s patented tool

    SciTech Connect (OSTI)

    Reed, P.D.

    1994-02-01

    Geraghty & Miller, Inc, of Midland, Texas conducted geologic and hydrologic feasibility studies of the potential applicability of Jack McIntyre`s patented tool for the recovery of natural gas from coalbed/sand formations in the Greater Green River Basin through literature surveys.

  6. Wind resource characterization results to support the Sandia Wind Farm Feasibility Study : August 2008 through March 2009.

    SciTech Connect (OSTI)

    Deola, Regina Anne

    2010-01-01

    Sandia National Laboratories Wind Technology Department is investigating the feasibility of using local wind resources to meet the requirements of Executive Order 13423 and DOE Order 430.2B. These Orders, along with the DOE TEAM initiative, identify the use of on-site renewable energy projects to meet specified renewable energy goals over the next 3 to 5 years. A temporary 30-meter meteorological tower was used to perform interim monitoring while the National Environmental Policy Act (NEPA) process for the larger Wind Feasibility Project ensued. This report presents the analysis of the data collected from the 30-meter meteorological tower.

  7. Oak Ridge Health Studies Phase 1 report, Volume 2: Part D, Dose Reconstruction Feasibility Study. Tasks 6, Hazard summaries for important materials at the Oak Ridge Reservation

    SciTech Connect (OSTI)

    Bruce, G.M.; Walker, L.B.; Widner, T.E.

    1993-09-01

    The purpose of Task 6 of Oak Ridge Phase I Health Studies is to provide summaries of current knowledge of toxic and hazardous properties of materials that are important for the Oak Ridge Reservation. The information gathered in the course of Task 6 investigations will support the task of focussing any future health studies efforts on those operations and emissions which have likely been most significant in terms of off-site health risk. The information gathered in Task 6 efforts will likely also be of value to individuals evaluating the feasibility of additional health,study efforts (such as epidemiological investigations) in the Oak Ridge area and as a resource for citizens seeking information on historical emissions.

  8. A FEASIBILITY AND OPTIMIZATION STUDY TO DETERMINE COOLING TIME AND BURNUP OF ADVANCED TEST REACTOR FUELS USING A NONDESTRUCTIVE TECHNIQUE

    SciTech Connect (OSTI)

    Jorge Navarro

    2013-12-01

    The goal of this study presented is to determine the best available non-destructive technique necessary to collect validation data as well as to determine burn-up and cooling time of the fuel elements onsite at the Advanced Test Reactor (ATR) canal. This study makes a recommendation of the viability of implementing a permanent fuel scanning system at the ATR canal and leads3 to the full design of a permanent fuel scan system. The study consisted at first in determining if it was possible and which equipment was necessary to collect useful spectra from ATR fuel elements at the canal adjacent to the reactor. Once it was establish that useful spectra can be obtained at the ATR canal the next step was to determine which detector and which configuration was better suited to predict burnup and cooling time of fuel elements non-destructively. Three different detectors of High Purity Germanium (HPGe), Lanthanum Bromide (LaBr3), and High Pressure Xenon (HPXe) in two system configurations of above and below the water pool were used during the study. The data collected and analyzed was used to create burnup and cooling time calibration prediction curves for ATR fuel. The next stage of the study was to determine which of the three detectors tested was better suited for the permanent system. From spectra taken and the calibration curves obtained, it was determined that although the HPGe detector yielded better results, a detector that could better withstand the harsh environment of the ATR canal was needed. The in-situ nature of the measurements required a rugged fuel scanning system, low in maintenance and easy to control system. Based on the ATR canal feasibility measurements and calibration results it was determined that the LaBr3 detector was the best alternative for canal in-situ measurements; however in order to enhance the quality of the spectra collected using this scintillator a deconvolution method was developed. Following the development of the deconvolution method for ATR applications the technique was tested using one-isotope, multi-isotope and fuel simulated sources. Burnup calibrations were perfomed using convoluted and deconvoluted data. The calibrations results showed burnup prediction by this method improves using deconvolution. The final stage of the deconvolution method development was to perform an irradiation experiment in order to create a surrogate fuel source to test the deconvolution method using experimental data. A conceptual design of the fuel scan system is path forward using the rugged LaBr3 detector in an above the water configuration and deconvolution algorithms.

  9. Feasibility study for remedial action for the Quarry Residuals Operable Unit at the Weldon Spring Site, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1998-03-01

    The U.S. Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis (Figure 1.1). Cleanup of the Weldon Spring site consists of several integrated components. The quarry residuals operable unit (QROU) is one of four operable units being evaluated. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, a remedial investigation/feasibility study (RI/FS) is being conducted to evaluate conditions and potential responses for the following areas and/or media that constitute the QROU: (1) the residual material (soil and sediment) remaining at the Weldon Spring quarry after removal of the bulk waste (about 11 million L [3 million gal] of uranium-contaminated ponded water was also addressed previous to bulk waste removal); (2) other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough and several creeks; and (3) quarry groundwater located primarily north of Femme Osage Slough. Potential impacts to the St. Charles County well field downgradient of the quarry area are also being addressed as part of QROU RI/FS evaluations. For remedial action sites, it is DOE policy to integrate values associated with the National Environmental Policy Act (NEPA) into the CERCLA decision-making process. The analyses contained herein address NEPA values as appropriate to the actions being considered for the QROU. A work plan summarizing initial site conditions and providing conceptual site hydrogeological and exposure models was published in January 1994. The RI and baseline risk assessment (BRA) reports have been completed. The RI discusses in detail the nature and extent and the fate and transport of contamination at the quarry area.

  10. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  11. A Feasibility Study of Sustainable Distributed Generation Technologies to Improve the electrical System on the Duck Valley Reservation

    SciTech Connect (OSTI)

    Herman Atkins, Shoshone-Paiute; Mark Hannifan, New West Technologies

    2005-06-30

    A range of sustainable energy options were assessed for feasibility in addressing chronic electric grid reliability problems at Duck Valley IR. Wind power and building energy efficiency were determined to have the most merit, with the Duck Valley Tribes now well positioned to pursue large scale wind power development for on- and off-reservation sales.

  12. Feasibility study of a dual detector configuration concept for simultaneous megavoltage imaging and dose verification in radiotherapy

    SciTech Connect (OSTI)

    Deshpande, Shrikant; McNamara, Aimee L.; Holloway, Lois; Metcalfe, Peter; Vial, Philip

    2015-04-15

    Purpose: To test the feasibility of a dual detector concept for comprehensive verification of external beam radiotherapy. Specifically, the authors test the hypothesis that a portal imaging device coupled to a 2D dosimeter provides a system capable of simultaneous imaging and dose verification, and that the presence of each device does not significantly detract from the performance of the other. Methods: The dual detector configuration comprised of a standard radiotherapy electronic portal imaging device (EPID) positioned directly on top of an ionization-chamber array (ICA) with 2 cm solid water buildup material (between EPID and ICA) and 5 cm solid backscatter material. The dose response characteristics of the ICA and the imaging performance of the EPID in the dual detector configuration were compared to the performance in their respective reference clinical configurations. The reference clinical configurations were 6 cm solid water buildup material, an ICA, and 5 cm solid water backscatter material as the reference dosimetry configuration, and an EPID with no additional buildup or solid backscatter material as the reference imaging configuration. The dose response of the ICA was evaluated by measuring the detectors response with respect to off-axis position, field size, and transit object thickness. Clinical dosimetry performance was evaluated by measuring a range of clinical intensity-modulated radiation therapy (IMRT) beams in transit and nontransit geometries. The imaging performance of the EPID was evaluated quantitatively by measuring the contrast-to-noise ratio (CNR) and spatial resolution. Images of an anthropomorphic phantom were also used for qualitative assessment. Results: The measured off-axis and field size response with the ICA in both transit and nontransit geometries for both dual detector configuration and reference dosimetry configuration agreed to within 1%. Transit dose response as a function of object thickness agreed to within 0.5%. All IMRT test patterns and clinical IMRT beams had gamma pass rates of ?98% at 2%/2 mm criteria. In terms of imaging performance, the measured CNR and spatial resolution (f{sub 50}) were 263.23 24.85 and 0.4025 1.25 10{sup ?3} for dual detector configuration and 324 26.65 and 0.4141 1.14 10{sup ?3} for reference imaging configuration, respectively. The CNR and spatial resolution were quantitatively worse in the dual detector configuration due to the additional backscatter. The difference in imaging performance was not visible in qualitative assessment of phantom images. Conclusions: Combining a commercially available ICA dosimetry device with a conventional EPID did not significantly detract from the performance of either device. Further improvements in imaging performance may be achieved with an optimized design. This study demonstrates the feasibility of a dual detector concept for simultaneous imaging and dosimetry in radiation therapy.

  13. Can We Predict Plan Quality for External Beam Partial Breast Irradiation: Results of a Multicenter Feasibility Study (Trans Tasman Radiation Oncology Group Study 06.02)

    SciTech Connect (OSTI)

    Kron, Tomas; Willis, David; Link, Emma; Lehman, Margot; Campbell, Gillian; O'Brien, Peter; Chua, Boon

    2013-11-15

    Purpose: Partial breast irradiation (PBI) after lumpectomy may be an option for selected patients with early breast cancer. A feasibility study of accelerated PBI delivered using external beam 3-dimensional conformal radiation therapy (RT) was undertaken at 8 Australasian centers. The present study evaluated the impact of patient, tumor, and RT technique-related factors on the quality of RT plans as determined by the dosevolume parameters of organs at risk. Methods and Materials: Forty-eight patients were enrolled in the study. All RT plans were centrally reviewed using predefined dosimetric criteria before commencement and after completion of protocol therapy. The RT plans of 47 patients met the dosevolume constraints, and all 47 patients received PBI to a prescribed dose of 38.5 Gy in 10 fractions. The RT plan quality was determined by volumes of the ipsilateral whole breast, lung, and heart that received 50% and 95%; 30%; and 5% of the prescribed dose, respectively. Patient, tumor, and RT technique-related factors were investigated for association with the parameters of RT plan quality. Results: The ratio of the planning target volume to the ipsilateral whole-breast volume was significantly associated with the ipsilateral breast doses on multiple variable analyses. The distance of the postlumpectomy surgical cavity from the heart and lung were predictive for heart and lung doses, respectively. A distance between surgical cavity and heart of >4 cm typically resulted in <1% of the heart volume receiving 5 Gy or less. It was more difficult to meet the heart dose constraint for left-sided and medially located tumors. Conclusions: Partial breast irradiation using 3-dimensional conformal RT was feasible within the study constraints. The ratio of planning target volume to ipsilateral whole-breast volume and the distance of surgical cavity from the heart were significant predictors of the quality of treatment plan for external beam PBI.

  14. SU-E-T-629: Feasibility Study of Treating Multiple Brain Tumors with Large Number of Noncoplanar IMRT Beams

    SciTech Connect (OSTI)

    Dong, P; Ma, L

    2014-06-15

    Purpose: To study the feasibility of treating multiple brain tumors withlarge number of noncoplanar IMRT beams. Methods: Thirty beams are selected from 390 deliverable beams separated by six degree in 4pi space. Beam selection optimization is based on a column generation algorithm. MLC leaf size is 2 mm. Dose matrices are calculated with collapsed cone convolution and superposition method in a 2 mm by 2mm by 2 mm grid. Twelve brain tumors of various shapes, sizes and locations are used to generate four plans treating 3, 6, 9 and 12 tumors. The radiation dose was 20 Gy prescribed to the 100% isodose line. Dose Volume Histograms for tumor and brain were compared. Results: All results are based on a 2 mm by 2 mm by 2 mm CT grid. For 3, 6, 9 and 12 tumor plans, minimum tumor doses are all 20 Gy. Mean tumor dose are 20.0, 20.1, 20.1 and 20.1 Gy. Maximum tumor dose are 23.3, 23.6, 25.4 and 25.4 Gy. Mean ventricles dose are 0.7, 1.7, 2.4 and 3.1 Gy.Mean subventricular zone dose are 0.8, 1.3, 2.2 and 3.2 Gy. Average Equivalent uniform dose (gEUD) values for tumor are 20.1, 20.1, 20.2 and 20.2 Gy. The conformity index (CI) values are close to 1 for all 4 plans. The gradient index (GI) values are 2.50, 2.05, 2.09 and 2.19. Conclusion: Compared with published Gamma Knife treatment studies, noncoplanar IMRT treatment plan is superior in terms of dose conformity. Due to maximum limit of beams per plan, Gamma knife has to treat multiple tumors separately in different plans. Noncoplanar IMRT plans theoretically can be delivered in a single plan on any modern linac with an automated couch and image guidance. This warrants further study of using noncoplanar IMRT as a viable treatment solution for multiple brain tumors.

  15. Standing Rock Sioux Tribe - Lakota/Dakota Nation Feasibility Study Supporting Wind Development and Establishment of Renewable Energy and Energy Development Office

    Energy Savers [EERE]

    (Washee Zee) 701-854-3437 fwasinzi@standingrock.org Standing Rock Sioux Tribe - Lakota/Dakota Nation  BACKGROUND INFORMATION ON STANDING ROCK RESERVATION  SITTING BULL COLLEGE WIND TURBINE  EECBG ENERGY EFFICIENCY & WIND TURBINE INSTALLATION AT SITTING BULL COLLEGE  WIND ASSESSMENT STUDY  ESTABLISHMENT OF RENEWABLE ENERGY & ENERGY DEVELOPMENT OFFICE (REEDO)  WIND FEASIBILITY STUDY  OCETI SAKOWIN POWER PROJECT  ONE OF SEVEN RESERVATIONS OF THE GREAT SIOUX NATION

  16. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Stringfellow Superfund Site in Riverside, California

    SciTech Connect (OSTI)

    Mosey, G.; Van Geet, O.

    2010-12-01

    This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on the Stringfellow Superfund Site in Riverside, California. The site was assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzed using an electric rate of $0.13/kWh and incentives offered by Southern California Edison under the California Solar Initiative. According to the assessment, a government-owned, ground-mounted PV system represents a technically and economically feasible option. The report recommends financing options that could assist in the implementation of such a system.

  17. A Feasibility Study to Determine Cooling Time and Burnup of ATR Fuel Using a Nondestructive Technique and Three Types of Gamma-ray Detectors

    SciTech Connect (OSTI)

    Jorge Navarro; Rahmat Aryaeinejad,; David W. Nigg

    2011-05-01

    A Feasibility Study to Determine Cooling Time and Burnup of ATR Fuel Using a Nondestructive Technique1 Rahmat Aryaeinejad, Jorge Navarro, and David W Nigg Idaho National Laboratory Abstract Effective and efficient Advanced Test Reactor (ATR) fuel management require state of the art core modeling tools. These new tools will need isotopic and burnup validation data before they are put into production. To create isotopic, burn up validation libraries and to determine the setup for permanent fuel scanner system a feasibility study was perform. The study consisted in measuring short and long cooling time fuel elements at the ATR canal. Three gamma spectroscopy detectors (HPGe, LaBr3, and HPXe) and two system configurations (above and under water) were used in the feasibility study. The first stage of the study was to investigate which detector and system configuration would be better suited for different scenarios. The second stage of the feasibility study was to create burnup and cooling time calibrations using experimental isotopic data collected and ORIGEN 2.2 burnup data. The results of the study establish that a better spectra resolution is achieve with an above the water configuration and that three detectors can be used in the permanent fuel scanner system for different situations. In addition it was conclude that a number of isotopic ratios and absolute measurements could be used to predict ATR fuel burnup and cooling times. 1This work was supported by the U.S. Department of Energy (DOE) under Battelle Energy Alliance, LLC Contract No. DE-AC07-05ID14517.

  18. Feasibility study on AFR-100 fuel conversion from uranium-based fuel to thorium-based fuel

    SciTech Connect (OSTI)

    Heidet, F.; Kim, T.; Grandy, C.

    2012-07-30

    Although thorium has long been considered as an alternative to uranium-based fuels, most of the reactors built to-date have been fueled with uranium-based fuel with the exception of a few reactors. The decision to use uranium-based fuels was initially made based on the technology maturity compared to thorium-based fuels. As a result of this experience, lot of knowledge and data have been accumulated for uranium-based fuels that made it the predominant nuclear fuel type for extant nuclear power. However, following the recent concerns about the extent and availability of uranium resources, thorium-based fuels have regained significant interest worldwide. Thorium is more abundant than uranium and can be readily exploited in many countries and thus is now seen as a possible alternative. As thorium-based fuel technologies mature, fuel conversion from uranium to thorium is expected to become a major interest in both thermal and fast reactors. In this study the feasibility of fuel conversion in a fast reactor is assessed and several possible approaches are proposed. The analyses are performed using the Advanced Fast Reactor (AFR-100) design, a fast reactor core concept recently developed by ANL. The AFR-100 is a small 100 MW{sub e} reactor developed under the US-DOE program relying on innovative fast reactor technologies and advanced structural and cladding materials. It was designed to be inherently safe and offers sufficient margins with respect to the fuel melting temperature and the fuel-cladding eutectic temperature when using U-10Zr binary metal fuel. Thorium-based metal fuel was preferred to other thorium fuel forms because of its higher heavy metal density and it does not need to be alloyed with zirconium to reduce its radiation swelling. The various approaches explored cover the use of pure thorium fuel as well as the use of thorium mixed with transuranics (TRU). Sensitivity studies were performed for the different scenarios envisioned in order to determine the best core performance characteristics for each of them. With the exception of the fuel type and enrichment, the reference AFR-100 core design characteristics were kept unchanged, including the general core layout and dimensions, assembly dimensions, materials and power rating. In addition, the mass of {sup 235}U required was kept within a reasonable range from that of the reference AFR-100 design. The core performance characteristics, kinetics parameters and reactivity feedback coefficients were calculated using the ANL suite of fast reactor analysis code systems. Orifice design calculations and the steady-state thermal-hydraulic analyses were performed using the SE2-ANL code. The thermal margins were evaluated by comparing the peak temperatures to the design limits for parameters such as the fuel melting temperature and the fuel-cladding eutectic temperature. The inherent safety features of AFR-100 cores proposed were assessed using the integral reactivity parameters of the quasi-static reactivity balance analysis. The design objectives and requirements, the computation methods used as well as a description of the core concept are provided in Section 2. The three major approaches considered are introduced in Section 3 and the neutronics performances of those approaches are discussed in the same section. The orifice zoning strategies used and the steady-state thermal-hydraulic performance are provided in Section 4. The kinetics and reactivity coefficients, including the inherent safety characteristics, are provided in Section 5, and the Conclusions in Section 6. Other scenarios studied and sensitivity studies are provided in the Appendix section.

  19. Economic and Technical Feasibility Study of Utility-Scale Wind Generation for the New York Buffalo River and South Buffalo Brownfield Opportunity Areas

    SciTech Connect (OSTI)

    Roberts, J. O.; Mosey, G.

    2014-04-01

    Through the RE-Powering America's Land initiative, the economic and technical feasibility of utilizing contaminated lands in the Buffalo, New York, area for utility-scale wind development is explored. The study found that there is available land, electrical infrastructure, wind resource, and local interest to support a commercial wind project; however, economies of scale and local electrical markets may need further investigation before significant investment is made into developing a wind project at the Buffalo Reuse Authority site.

  20. FEASIBILITY STUDY FOR THE DEVELOPMENT OF A TEST BED PROGRAM FOR NOVEL DETECTORS AND DETECTOR MATERIALS AT SRS H-CANYON SEPARATIONS FACILITY

    SciTech Connect (OSTI)

    Sexton, L.; Mendez-Torres, A.; Hanks, D.

    2011-06-07

    Researchers at the Savannah River National Laboratory (SRNL) have proposed that a test bed for advanced detectors be established at the H-Canyon separations facility located on the DOE Savannah River Site. The purpose of the proposed test bed will be to demonstrate the capabilities of emerging technologies for national and international safeguards applications in an operational environment, and to assess the ability of proven technologies to fill any existing gaps. The need for such a test bed has been expressed in the National Nuclear Security Administration's (NNSA) Next Generation Safeguards Initiative (NGSI) program plan and would serve as a means to facilitate transfer of safeguards technologies from the laboratory to an operational environment. New detectors and detector materials open the possibility of operating in a more efficient and cost effective manner, thereby strengthening national and international safeguards objectives. In particular, such detectors could serve the DOE and IAEA in improving timeliness of detection, minimizing uncertainty and improving confidence in results. SRNL's concept for the H Canyon test bed program would eventually open the facility to other DOE National Laboratories and establish a program for testing national and international safeguards related equipment. The initial phase of the test bed program is to conduct a comprehensive feasibility study to determine the benefits and challenges associated with establishing such a test bed. The feasibility study will address issues related to the planning, execution, and operation of the test bed program. Results from the feasibility study will be summarized and discussed in this paper.

  1. A feasibility study of oil shale fired pulse combustors with applications to oil shale retorting. Final report

    SciTech Connect (OSTI)

    Morris, G.J.; Johnson, E.K.; Zhang, G.Q.; Roach, R.A.

    1992-07-01

    The results of the experimental investigation performed to determine the feasibility of using pulverized Colorado oil shale to fuel a bench scale pulse combustor reveal that oil shale cannot sustain pulsations when used alone as fuel. Trace amounts of propane mixed with the oil shale enabled the pulsations, however. Up to 80% of the organic material in the oil shale was consumed when it was mixed with propane in the combustor. Beyond the feasibility objectives, the operating conditions of the combustor fuel with propane and mixtures of oil shale and propane were characterized with respect to pulsation amplitude and frequency and the internal combustor wall temperature over fuel lean and fuel rich stoichiometries. Maximum pressure excursions of 12.5 kPa were experienced in the combustor. Pulsation frequencies ranged from 50 to nearly 80 Hz. Cycle resolved laser Doppler anemometry velocities were measured at the tail pipe exit plane. Injecting inert mineral matter (limestone) into the pulse combustor while using propane fuel had only a slight effect on the pulsation frequency for the feed rates tested.

  2. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former St. Marks Refinery in St. Marks, Florida

    SciTech Connect (OSTI)

    Lisell, L.; Mosey, G.

    2010-09-01

    This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on a brownfield site in St. Marks, Florida. The site was assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzed using an electric rate of $0.08/kWh and incentives offered in the State of Florida and from the two accessible utilities, Progress Energy and the City of Tallahassee. According to the site production calculations, the most cost-effective system in terms of return on investment is the fixed-tilt thin film technology. The report recommends financing options that could assist in the implementation of such a system.

  3. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Refuse Hideaway Landfill in Middleton, Wisconsin

    SciTech Connect (OSTI)

    Salasovich, J.; Mosey, G.

    2011-08-01

    This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on a brownfield site at the Refuse Hideaway Landfill in Middleton, Wisconsin. The site currently has a PV system in place and was assessed for further PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzed using an electric rate of $0.1333/kWh and incentives offered by the State of Wisconsin and by the serving utility, Madison Gas and Electric. According to the site production calculations, the most cost-effective system in terms of return on investment is the thin-film fixed-tilt technology. The report recommends financing options that could assist in the implementation of such a system.

  4. Individualized Radical Radiotherapy of Non-Small-Cell Lung Cancer Based on Normal Tissue Dose Constraints: A Feasibility Study

    SciTech Connect (OSTI)

    Baardwijk, Angela van Bosmans, Geert; Boersma, Liesbeth; Wanders, Stofferinus; Dekker, Andre; Dingemans, Anne Marie C.; Bootsma, Gerben; Geraedts, Wiel; Pitz, Cordula; Simons, Jean; Lambin, Philippe; Ruysscher, Dirk de

    2008-08-01

    Purpose: Local recurrence is a major problem after (chemo-)radiation for non-small-cell lung cancer. We hypothesized that for each individual patient, the highest therapeutic ratio could be achieved by increasing total tumor dose (TTD) to the limits of normal tissues, delivered within 5 weeks. We report first results of a prospective feasibility trial. Methods and Materials: Twenty-eight patients with medically inoperable or locally advanced non-small-cell lung cancer, World Health Organization performance score of 0-1, and reasonable lung function (forced expiratory volume in 1 second > 50%) were analyzed. All patients underwent irradiation using an individualized prescribed TTD based on normal tissue dose constraints (mean lung dose, 19 Gy; maximal spinal cord dose, 54 Gy) up to a maximal TTD of 79.2 Gy in 1.8-Gy fractions twice daily. No concurrent chemoradiation was administered. Toxicity was scored using the Common Terminology Criteria for Adverse Events criteria. An {sup 18}F-fluoro-2-deoxy-glucose-positron emission tomography-computed tomography scan was performed to evaluate (metabolic) response 3 months after treatment. Results: Mean delivered dose was 63.0 {+-} 9.8 Gy. The TTD was most often limited by the mean lung dose (32.1%) or spinal cord (28.6%). Acute toxicity generally was mild; only 1 patient experienced Grade 3 cough and 1 patient experienced Grade 3 dysphagia. One patient (3.6%) died of pneumonitis. For late toxicity, 2 patients (7.7%) had Grade 3 cough or dyspnea; none had severe dysphagia. Complete metabolic response was obtained in 44% (11 of 26 patients). With a median follow-up of 13 months, median overall survival was 19.6 months, with a 1-year survival rate of 57.1%. Conclusions: Individualized maximal tolerable dose irradiation based on normal tissue dose constraints is feasible, and initial results are promising.

  5. Lower Sioux Wind Feasibility & Development

    SciTech Connect (OSTI)

    Minkel, Darin

    2012-04-01

    This report describes the process and findings of a Wind Energy Feasibility Study (Study) conducted by the Lower Sioux Indian Community (Community). The Community is evaluating the development of a wind energy project located on tribal land. The project scope was to analyze the critical issues in determining advantages and disadvantages of wind development within the Community. This analysis addresses both of the Community's wind energy development objectives: the single turbine project and the Commerical-scale multiple turbine project. The main tasks of the feasibility study are: land use and contraint analysis; wind resource evaluation; utility interconnection analysis; and project structure and economics.

  6. Hydropower Advancement Project (HAP): Audits and Feasibility...

    Broader source: Energy.gov (indexed) [DOE]

    Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades Office presentation icon 64hapornlsmith.ppt More Documents & ...

  7. Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006

    SciTech Connect (OSTI)

    R. P. Wells

    2007-05-09

    This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

  8. Commercial low-Btu coal-gasification plant. Feasibility study: General Refractories Company, Florence, Kentucky. Volume I. Project summary. [Wellman-Galusha

    SciTech Connect (OSTI)

    1981-11-01

    In response to a 1980 Department of Energy solicitation, the General Refractories Company submitted a Proposal for a feasibility study of a low Btu gasification facility for its Florence, KY plant. The proposed facility would substitute low Btu gas from a fixed bed gasifier for natural gas now used in the manufacture of insulation board. The Proposal from General Refractories was prompted by a concern over the rising costs of natural gas, and the anticipation of a severe increase in fuel costs resulting from deregulation. The proposed feasibility study is defined. The intent is to provide General Refractories with the basis upon which to determine the feasibility of incorporating such a facility in Florence. To perform the work, a Grant for which was awarded by the DOE, General Refractories selected Dravo Engineers and Contractors based upon their qualifications in the field of coal conversion, and the fact that Dravo has acquired the rights to the Wellman-Galusha technology. The LBG prices for the five-gasifier case are encouraging. Given the various natural gas forecasts available, there seems to be a reasonable possibility that the five-gasifier LBG prices will break even with natural gas prices somewhere between 1984 and 1989. General Refractories recognizes that there are many uncertainties in developing these natural gas forecasts, and if the present natural gas decontrol plan is not fully implemented some financial risks occur in undertaking the proposed gasification facility. Because of this, General Refractories has decided to wait for more substantiating evidence that natural gas prices will rise as is now being predicted.

  9. SU-E-J-175: Proton Dose Calculation On Scatter-Corrected CBCT Image: Feasibility Study for Adaptive Proton Therapy

    SciTech Connect (OSTI)

    Park, Y; Winey, B; Sharp, G

    2014-06-01

    Purpose: To demonstrate feasibility of proton dose calculation on scattercorrected CBCT images for the purpose of adaptive proton therapy. Methods: Two CBCT image sets were acquired from a prostate cancer patient and a thorax phantom using an on-board imaging system of an Elekta infinity linear accelerator. 2-D scatter maps were estimated using a previously introduced CT-based technique, and were subtracted from each raw projection image. A CBCT image set was then reconstructed with an open source reconstruction toolkit (RTK). Conversion from the CBCT number to HU was performed by soft tissue-based shifting with reference to the plan CT. Passively scattered proton plans were simulated on the plan CT and corrected/uncorrected CBCT images using the XiO treatment planning system. For quantitative evaluation, water equivalent path length (WEPL) was compared in those treatment plans. Results: The scatter correction method significantly improved image quality and HU accuracy in the prostate case where large scatter artifacts were obvious. However, the correction technique showed limited effects on the thorax case that was associated with fewer scatter artifacts. Mean absolute WEPL errors from the plans with the uncorrected and corrected images were 1.3 mm and 5.1 mm in the thorax case and 13.5 mm and 3.1 mm in the prostate case. The prostate plan dose distribution of the corrected image demonstrated better agreement with the reference one than that of the uncorrected image. Conclusion: A priori CT-based CBCT scatter correction can reduce the proton dose calculation error when large scatter artifacts are involved. If scatter artifacts are low, an uncorrected CBCT image is also promising for proton dose calculation when it is calibrated with the soft-tissue based shifting.

  10. SU-E-T-421: Feasibility Study of Volumetric Modulated Arc Therapy with Constant Dose Rate for Endometrial Cancer

    SciTech Connect (OSTI)

    Yang, R; Wang, J

    2014-06-01

    Purpose: To investigate the feasibility, efficiency, and delivery accuracy of volumetric modulated arc therapy with constant dose rate (VMAT-CDR) for whole-pelvic radiotherapy (WPRT) of endometrial cancer. Methods: The nine-Field intensity-modulated radiotherapy (IMRT), VMAT with variable dose-rate (VMAT-VDR), and VMAT-CDR plans were created for 9 patients with endometrial cancer undergoing WPRT. The dose distribution of planning target volume (PTV), organs at risk (OARs), and normal tissue (NT) were compared. The monitor units (MUs) and treatment delivery time were also evaluated. For each VMAT-CDR plan, a dry Run was performed to assess the dosimetric accuracy with MatriXX from IBA. Results: Compared with IMRT, the VMAT-CDR plans delivered a slightly greater V20 of the bowel, bladder, pelvis bone, and NT, but significantly decreased the dose to the high-dose region of the rectum and pelvis bone. The MUs Decreased from 1105 with IMRT to 628 with VMAT-CDR. The delivery time also decreased from 9.5 to 3.2 minutes. The average gamma pass rate was 95.6% at the 3%/3 mm criteria with MatriXX pretreatment verification for 9 patients. Conclusion: VMAT-CDR can achieve comparable plan quality with significant shorter delivery time and smaller number of MUs compared with IMRT for patients with endometrial cancer undergoing WPRT. It can be accurately delivered and be an alternative to IMRT on the linear accelerator without VDR capability. This work is supported by the grant project, National Natural; Science Foundation of China (No. 81071237)

  11. PRELIMINARY CARBON DIOXIDE CAPTURE TECHNICAL AND ECONOMIC FEASIBILITY STUDY EVALUATION OF CARBON DIOXIDE CAPTURE FROM EXISTING COAL FIRED PLANTS BY HYBRID SORPTION USING SOLID SORBENTS

    SciTech Connect (OSTI)

    Benson, Steven; Envergex, Srivats; Browers, Bruce; Thumbi, Charles

    2013-01-01

    Barr Engineering Co. was retained by the Institute for Energy Studies (IES) at University of North Dakota (UND) to conduct a technical and economic feasibility analysis of an innovative hybrid sorbent technology (CACHYS™) for carbon dioxide (CO2) capture and separation from coal combustion–derived flue gas. The project team for this effort consists of the University of North Dakota, Envergex LLC, Barr Engineering Co., and Solex Thermal Science, along with industrial support from Allete, BNI Coal, SaskPower, and the North Dakota Lignite Energy Council. An initial economic and feasibility study of the CACHYS™ concept, including definition of the process, development of process flow diagrams (PFDs), material and energy balances, equipment selection, sizing and costing, and estimation of overall capital and operating costs, is performed by Barr with information provided by UND and Envergex. The technology—Capture from Existing Coal-Fired Plants by Hybrid Sorption Using Solid Sorbents Capture (CACHYS™)—is a novel solid sorbent technology based on the following ideas: reduction of energy for sorbent regeneration, utilization of novel process chemistry, contactor conditions that minimize sorbent-CO2 heat of reaction and promote fast CO2 capture, and a low-cost method of heat management. The technology’s other key component is the use of a low-cost sorbent.

  12. Geothermal Energy Market Study on the Atlantic Coastal Plain: Technical Feasibility of use of Eastern Geothermal Energy in Vacuum Distillation of Ethanol Fuel

    SciTech Connect (OSTI)

    1981-04-01

    The DOE is studying availability, economics, and uses of geothermal energy. These studies are being conducted to assure maximum cost-effective use of geothermal resources. The DOE is also aiding development of a viable ethanol fuel industry. One important point of the ethanol program is to encourage use of non-fossil fuels, such as geothermal energy, as process heat to manufacture ethanol. Geothermal waters available in the eastern US tend to be lower in temperature (180 F or less) than those available in the western states (above 250 F). Technically feasible use of eastern geothermal energy for ethanol process heat requires use of technology that lowers ethanol process temperature requirements. Vacuum (subatmospheric) distillation is one such technology. This study, then, addresses technical feasibility of use of geothermal energy to provide process heat to ethanol distillation units operated at vacuum pressures. They conducted this study by performing energy balances on conventional and vacuum ethanol processes of ten million gallons per year size. Energy and temperature requirements for these processes were obtained from the literature or were estimated (for process units or technologies not covered in available literature). Data on available temperature and energy of eastern geothermal resources was obtained from the literature. These data were compared to ethanol process requirements, assuming a 150 F geothermal resource temperature. Conventional ethanol processes require temperatures of 221 F for mash cooking to 240 F for stripping. Fermentation, conducted at 90 F, is exothermic and requires no process heat. All temperature requirements except those for fermentation exceed assumed geothermal temperatures of 150 F. They assumed a 130 millimeter distillation pressure for the vacuum process. It requires temperatures of 221 F for mash cooking and 140 F for distillation. Data indicate lower energy requirements for the vacuum ethanol process (30 million BTUs per hour) than for the conventional process (36 million BTUs per hour). Lower energy requirements result from improved process energy recovery. Data examined in this study indicate feasible use of eastern geothermal heated waters (150 F) to provide process heat for vacuum (130 mm Hg) ethanol distillation units. Data indicate additional heat sources are needed to raise geothermal temperatures to the 200 F level required by mash cooking. Data also indicate potential savings in overall process energy use through use of vacuum distillation technology. Further study is needed to confirm conclusions reached during this study. Additional work includes obtaining energy use data from vacuum ethanol distillation units currently operating in the 130 millimeter pressure range; economic analysis of different vacuum pressures to select an optimum; and operation of a pilot geothermally heated vacuum column to produce confirmatory process data.

  13. Feasibility study report for the Imperial Valley Ethanol Refinery: a 14. 9-million-gallon-per-year ethanol synfuel refinery utilizing geothermal energy

    SciTech Connect (OSTI)

    Not Available

    1981-03-01

    The construction and operation of a 14,980,000 gallon per year fuel ethanol from grain refinery in the Imperial Valley of California is proposed. The Imperial Valley Ethanol Refinery (refinery) will use hot geothermal fluid from geothermal resources at the East Mesa area as the source of process energy. In order to evaluate the economic viability of the proposed Project, exhaustive engineering, cost analysis, and financial studies have been undertaken. This report presents the results of feasibility studies undertaken in geothermal resource, engineering, marketing financing, management, environment, and permits and approvals. The conclusion of these studies is that the Project is economically viable. US Alcohol Fuels is proceeding with its plans to construct and operate the Refinery.

  14. Computer aided cogeneration feasibility analysis

    SciTech Connect (OSTI)

    Anaya, D.A.; Caltenco, E.J.L.; Robles, L.F.

    1996-12-31

    A successful cogeneration system design depends of several factors, and the optimal configuration can be founded using a steam and power simulation software. The key characteristics of one of this kind of software are described below, and its application on a process plant cogeneration feasibility analysis is shown in this paper. Finally a study case is illustrated. 4 refs., 2 figs.

  15. Remedial investigation/feasibility study of the Clinch River/Poplar Creek Operable Unit. Volume 3. Risk assessment information. Appendixes E, F

    SciTech Connect (OSTI)

    1996-03-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the U.S. Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is Volume 3 of the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  16. Remedial investigation/feasibility study of the Clinch River/Poplar Creek operable unit. Volume 3: Appendixes E and F -- Risk assessment information

    SciTech Connect (OSTI)

    1996-06-01

    This report presents the findings of an investigation into contamination of the Clinch River and Poplar Creek near the US Department of Energy`s (DOE`s) Oak Ridge Reservation (ORR) in eastern Tennessee. For more than 50 years, various hazardous and radioactive substances have been released to the environment as a result of operations and waste management activities at the ORR. In 1989, the ORR was placed on the National Priorities List (NPL), established and maintained under the federal Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under CERCLA, NPL sites must be investigated to determine the nature and extent of contamination at the site, assess the risk to human health and the environment posed by the site, and, if necessary, identify feasible remedial alternatives that could be used to clean the site and reduce risk. To facilitate the overall environmental restoration effort at the ORR, CERCLA activities are being implemented individually as distinct operable units (OUs). This document is the combined Remedial Investigation and Feasibility Study Report for the Clinch River/Poplar Creek OU.

  17. Feasibility Studies on Disturbance Feedforward Techniques to Improve Wind Turbine Load Mitigation Performance: January 2009 -- January 2010

    SciTech Connect (OSTI)

    Laks, J.H.; Dunne, F.; Pao, L. Y.

    2010-12-01

    This study investigates disturbance feedforward and preview control to better understand the best possible improvement in load mitigation using advanced wind measurement techniques.

  18. Petroleum Resource Management and Assessment project for the Western Siberian Administration Russia. TDA feasibility study. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    The objective of the study is: (1) To determine the nature and availability of the information necessary for Resource Assessment in oil fields to be open to foreign investment; (2) To determine what resources are required to implement the 'Alberta Model' of Resource Management in Siberia; (3) To establish a pilot Data Collection and Information System, including software, hardware and technology; (4) To indicate whether the studied database model and related software can meet Russia's long term requirements for information management in the petroleum sector; (5) The transfer of information techniques to the Russian implementation teams; and (6) To define the requirements for a resource/economic study.

  19. Focused feasibility study for surface soil at the main pits and pushout area, J-field toxic burning pits area, Aberdeen Proving Ground, Maryland

    SciTech Connect (OSTI)

    Patton, T.; Benioff, P.; Biang, C.; Butler, J.

    1996-06-01

    The Environmental Management Division of Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation and feasibility study of the J-Field area at APG pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act, as amended (CERCLA). J-Field is located within the Edgewood Area of APG in Harford County, Maryland. Since World War II, activities in the Edgewood Area have included the development, manufacture, testing, and destruction of chemical agents and munitions. These materials were destroyed at J-Field by open burning/open detonation. Portions of J-Field continue to be used for the detonation and disposal of unexploded ordnance (UXO) by open burning/open detonation under authority of the Resource Conservation and Recovery Act.

  20. Feasibility study results for dry sorbent furnace injection for SO sub 2 control Prairie Creek No. 4 Iowa Electric Light and Power Company

    SciTech Connect (OSTI)

    Smith, P.V. ); Rehrauer, H.W. )

    1991-01-01

    As a result of the recent passage of new amendments to the Clean Air Act, many U.S. power plants will be required to reduce sulfur dioxide (SO{sub 2}) emissions. Iowa Electric Light and Power (IELP) was interested in investigating a number of options that will allow Prairie Creek Unit 4 to operate in compliance with these new regulations. One of these options was Dry Sorbent Injection (DSI), a relatively simple and low cost retrofit technique, useful for controlling SO{sub 2} concentrations in coal combustion flue gas. The purpose of the program was to obtain operational data necessary to aid in the identification and assessment of DSI options that have a high potential for successful application. This paper contains a summary and analysis of the data obtained during the test effort. It also contains a discussion of the results of each of the major tasks undertaken to accomplish this feasibility study.

  1. Technical and Economic Feasibility Study of Utility-Scale Wind at the Doepke-Holliday Superfund Site. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Roberts, J. O.; Mosey, G.

    2013-05-01

    This report is a technical and financial feasibility study of a utility-scale wind turbine on the Doepke Superfund site.

  2. Feasibility study of Northeast Thailand Gas Pipeline Project. Final report. Part 2. Compressed natural gas. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1989-09-01

    The volume is the second part of a three part study submitted to the Petroleum Authority of Thailand. Part II analyzes the potential use of compressed natural gas (CNG) as a transportation fuel for high mileage vehicles traveling the highway system of Thailand. The study provides an initial estimate of buses and trucks that are potential candidates for converting to natural gas vehicles (NGV). CNG technology is briefly reviewed. The types of refueling stations that may be sited along the highway are discussed. The estimated capital investments and typical layouts are presented. The report also discusses the issues involved in implementing a CNG program in Thailand, such as safety, user acceptability and the government's role.

  3. Feasibility Study of Economics and Performance of Biomass Power Generation at the Former Farmland Industries Site in Lawrence, Kansas. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Tomberlin, G.; Mosey, G.

    2013-03-01

    Under the RE-Powering America's Land initiative, the U.S. Environmental Protection Agency (EPA) provided funding to the National Renewable Energy Laboratory (NREL) to support a feasibility study of biomass renewable energy generation at the former Farmland Industries site in Lawrence, Kansas. Feasibility assessment team members conducted a site assessment to gather information integral to this feasibility study. Information such as biomass resources, transmission availability, on-site uses for heat and power, community acceptance, and ground conditions were considered.

  4. Th/U-233 multi-recycle in pressurized water reactors : feasibility study of multiple homogeneous and heterogeneous assembly designs.

    SciTech Connect (OSTI)

    Yun, D.; Taiwo, T. A.; Kim, T. K.; Mohamed, A.; Nuclear Engineering Division

    2010-10-01

    The use of thorium in current or advanced light water reactors (LWRs) has been of interest in recent years. These interests have been associated with the need to increase nuclear fuel resources and the perceived non-proliferation advantages of the utilization of thorium in the fuel cycle. Various options have been considered for the use of thorium in the LWR fuel cycle. The possibility for thorium utilization in a multi-recycle system has also been considered in past literature, primarily because of the potential for near breeders with Th/U-233 in the thermal energy range. The objective of this study is to evaluate the potential of Th/U-233 fuel multi-recycle in current LWRs, focusing on pressurized water reactors (PWRs). Approaches for sustainable multi-recycle without the need for external fissile material makeup have been investigated. The intent is to obtain a design that allows existing PWRs to be used with minimal modifications.

  5. Geology and geohydrology of the east Texas Basin. Report on the progress of nuclear waste isolation feasibility studies (1979)

    SciTech Connect (OSTI)

    Kreitler, C.W.; Agagu, O.K.; Basciano, J.M.

    1980-01-01

    The program to investigate the suitability of salt domes in the east Texas Basin for long-term nuclear waste repositories addresses the stability of specific domes for potential repositories and evaluates generically the geologic and hydrogeologic stability of all the domes in the region. Analysis during the second year was highlighted by a historical characterization of East Texas Basin infilling, the development of a model to explain the growth history of the domes, the continued studies of the Quaternary in East Texas, and a better understanding of the near-dome and regional hydrology of the basin. Each advancement represents a part of the larger integrated program addressing the critical problems of geologic and hydrologic stabilities of salt domes in the East Texas Basin.

  6. Controlling fusion yield in tokamaks with spin polarized fuel, and feasibility studies on the DIII-D tokamak

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Pace, D. C.; Lanctot, M. J.; Jackson, G. L.; Sandorfi, Andy M.; Smith, S. P.; Wei, Xiangdong

    2015-09-21

    The march towards electricity production through tokamaks requires the construction of new facilities and the inevitable replacement of the previous generation. There are, however, research topics that are better suited to the existing tokamaks, areas of great potential that are not sufficiently mature for implementation in high power machines, and these provide strong support for a balanced policy that includes the redirection of existing programs. Spin polarized fusion, in which the nuclei of tokamak fuel particles are spin-aligned and favorably change both the fusion cross-section and the distribution of initial velocity vectors of charged fusion products, is described here asmore » an example of a technological and physics topic that is ripe for development in a machine such as the DIII-D tokamak. In this study, such research and development experiments may not be efficient at the ITER-scale, while the plasma performance, diagnostic access, and collaborative personnel available within the United States’ magnetic fusion research program, and at the DIII-D facility in particular, provide a unique opportunity to further fusion progress.« less

  7. Controlling fusion yield in tokamaks with spin polarized fuel, and feasibility studies on the DIII-D tokamak

    SciTech Connect (OSTI)

    Pace, D. C.; Lanctot, M. J.; Jackson, G. L.; Sandorfi, Andy M.; Smith, S. P.; Wei, Xiangdong

    2015-09-21

    The march towards electricity production through tokamaks requires the construction of new facilities and the inevitable replacement of the previous generation. There are, however, research topics that are better suited to the existing tokamaks, areas of great potential that are not sufficiently mature for implementation in high power machines, and these provide strong support for a balanced policy that includes the redirection of existing programs. Spin polarized fusion, in which the nuclei of tokamak fuel particles are spin-aligned and favorably change both the fusion cross-section and the distribution of initial velocity vectors of charged fusion products, is described here as an example of a technological and physics topic that is ripe for development in a machine such as the DIII-D tokamak. In this study, such research and development experiments may not be efficient at the ITER-scale, while the plasma performance, diagnostic access, and collaborative personnel available within the United States’ magnetic fusion research program, and at the DIII-D facility in particular, provide a unique opportunity to further fusion progress.

  8. SU-E-T-617: A Feasibility Study of Navigation Based Multi Criteria Optimization for Advanced Cervical Cancer IMRT Planning

    SciTech Connect (OSTI)

    Ma, C

    2014-06-01

    Purpose: This study aims to validate multi-criteria optimization (MCO) against standard intensity modulated radiation therapy (IMRT) optimization for advanced cervical cancer in RayStation (v2.4, RaySearch Laboratories, Sweden). Methods: 10 advanced cervical cancer patients IMRT plans were randomly selected, these plans were designed with step and shoot optimization, new plans were then designed with MCO based on these plans,while keeping optimization conditions unchanged,comparison was made between both kinds of plans including the dose volume histogram parameters of PTV and OAR,and were analysed by pairing-t test. Results: We normalize the plan so that 95% volume of PTV achieved the prescribed dose(50Gy). The volume of radiation 10, 20, 30, and 40 Gy of the rectum were reduced by 14.7%,26.8%,21.1%,10.5% respectively(P?0.05). The mean dose of rectum were reduced by 7.2Gy(P?0.05). There were no significant differences for the dosimetric parameters for the bladder. Conclusion: In comparision with standard IMRT optimization, MCO reduces the dose of organs at risk with the same PTV coverage,but the result needs further clinical evalution.

  9. SU-E-T-186: Feasibility Study of Glass Cherenkov Detector for Prompt Gamma Detection in Proton Therapy

    SciTech Connect (OSTI)

    Lau, A; Chen, Y; Ahmad, S

    2014-06-01

    Purpose: To simulate a Cherenkov glass detector system utilizing prompt gamma (PG) technique to quantify range uncertainties in proton radiation therapy. Methods: A simulation of high energy photons typically produced in proton interactions with materials incident onto a block of Cherenkov glass was performed with the Geant4 toolkit. The standard electromagnetic package was used along with several decay modules (G4Decay, G4DecayPhysics, and G4RadioactiveDecayPhysics) and the optical photon components (G4OpticalPhysics). Our setup included a pencil beam consisting of a hundred thousand 6 MeV photons (approximately the deexcitation energy released from 16O) incident onto a 2.5 ⊗ 2.5 ⊗ 1.5 cm3 of a Cherenkov glass (7.2 g of In2O3 + 90 g cladding, density of 2.82 g/cm3, Zeff = 33.7, index of refraction 1.56). The energy deposited from incident 6 MeV photons as well as secondary electrons and resulting optical photons were recorded. Results: The energy deposited by 6 MeV photons in glass material showed several peaks that included the photoelectric, the single and double escape peaks. About 11% of incident photons interacted with glass material to deposit energy. Most of the photons collected were in the region of double escape peak (approximately 4.98 MeV). The secondary electron spectrum produced from incident photons showed a high energy peak located near 6 MeV and a sharp peak located ∼120 keV with a continuous distribution between these two points. The resulting Cherenkov photons produced showed a continuous energy distribution between 2 and 5 eV with a slight increase in yield beginning about 3 eV. The amount of Cherenkov photons produced per interacting incident 6 MeV photon was ∼240.7. Conclusion: This study suggests the viability of utilizing the Cherenkov glass material as a possible prompt gamma photon detection device. Future work will include optimization of the detector system to maximize photon detection efficiency.

  10. Focused ultrasound treatment of abscesses induced by methicillin resistant Staphylococcus aureus: Feasibility study in a mouse model

    SciTech Connect (OSTI)

    Rieck, Birgit; Bates, David; Pichardo, Samuel E-mail: lcuriel@lakeheadu.ca; Curiel, Laura E-mail: lcuriel@lakeheadu.ca; Zhang, Kunyan; Escott, Nicholas; Mougenot, Charles

    2014-06-15

    Purpose: To study the therapeutic effect of focused ultrasound on abscesses induced by methicillin-resistantStaphylococcus aureus (MRSA). MRSA is a major nosocomial pathogen where immunocompromised patients are prone to develop infections that are less and less responsive to regular treatments. Because of its capability to induce a rise of temperature at a very precise location, the use of focused ultrasound represents a considerable opportunity for therapy of localized MRSA-related infections. Methods: 50μl of MRSA strain USA400 bacteria suspension at a concentration of 1.32 ± 0.5 × 10{sup 5} colony forming units (cfu)/μl was injected subcutaneously in the left flank of BALB/c mice. An abscess of 6 ± 2 mm in diameter formed after 48 h. A transducer operating at 3 MHz with a focal length of 50 mm and diameter of 32 mm was used to treat the abscess. The focal point was positioned 2 mm under the skin at the abscess center. Forty-eight hours after injection four ultrasound exposures of 9 s each were applied to each abscess under magnetic resonance imaging guidance. Each exposure was followed by a 1 min pause. These parameters were based on preliminary experiments to ensure repetitive accurate heating of the abscess. Real-time estimation of change of temperature was done using water-proton resonance frequency and a communication toolbox (matMRI) developed inhouse. Three experimental groups of animals each were tested: control, moderate temperature (MT), and high temperature (HT). MT and HT groups reached, respectively, 52.3 ± 5.1 and 63.8 ± 7.5 °C at the end of exposure. Effectiveness of the treatment was assessed by evaluating the bacteria amount of the treated abscess 1 and 4 days after treatment. Myeloperoxidase (MPO) assay evaluating the neutrophil amount was performed to assess the local neutrophil recruitment and the white blood cell count was used to evaluate the systemic inflammatory response after focused ultrasound treatment. Results: Macroscopic evaluation of treated abscess indicated a diminution of external size of abscess 1 day after treatment. Treatment did not cause open wounds. The median (lower to upper quartile) bacterial count 1 day after treatment was 6.18 × 10{sup 3} (0.76 × 10{sup 3}–11.18 × 10{sup 3}), 2.86 × 10{sup 3} (1.22 × 10{sup 3}–7.07 × 10{sup 3}), and 3.52 × 10{sup 3} (1.18 × 10{sup 3}–6.72 × 10{sup 3}) cfu/100 μl for control, MT and HT groups, respectively; for the 4-day end point, the count was 1.37 × 10{sup 3} (0.67 × 10{sup 3}–2.89 × 10{sup 3}), 1.35 × 10{sup 3} (0.09 × 10{sup 3}–2.96 × 10{sup 3}), and 0.07 × 10{sup 3} (0.03 × 10{sup 3}–0.36 × 10{sup 3}) cfu/100 μl for control, MT and HT, showing a significant reduction (p = 0.002) on the bacterial load four days after focused ultrasound treatment when treating at high temperature (HT). The MPO amount remained unchanged between groups and days, indicating no change on local neutrophil recruitment in the abscess caused by the treatment. The white blood cell count remained unchanged between groups and days indicating that no systemic inflammatory response was caused by the treatment. Conclusions: Focused ultrasound induces a therapeutic effect in abscesses induced by MRSA. This effect is observed as a reduction of the number bacteria without significantly altering the amount of MPO at the site of a MRSA-induced abscess. These initial results suggest that focused ultrasound is a viable option for the treatment of localized MRSA-related infections.

  11. Geohydrologic feasibility study of the Piceance Basin of Colorado for the potential applicability of Jack W. McIntyre`s patented gas/produced water separation process

    SciTech Connect (OSTI)

    Kieffer, F.

    1994-02-01

    Geraghty & Miller, Inc. of Midland, Texas conducted geologic and hydrologic feasibility studies of the potential applicability of Jack McIntyre`s patented process for the recovery of natural gas from coalbed/sand formations in the Piceance Basin through literature surveys. Jack McIntyre`s tool separates produced water from gas and disposes of the water downhole into aquifers unused because of poor water quality, uneconomic lifting costs or poor aquifer deliverability. The beneficial aspects of this technology are two fold. The process increases the potential for recovering previously uneconomic gas resources by reducing produced water lifting, treatment and disposal costs. Of greater importance is the advantage of lessening the environmental impact of produced water by downhole disposal. Results from the survey indicate that research in the Piceance Basin includes studies of the geologic, hydrogeologic, conventional and unconventional recovery oil and gas technologies. Available information is mostly found centered upon the geology and hydrology for the Paleozoic and Mesozoic sediments. Lesser information is available on production technology because of the limited number of wells currently producing in the basin. Limited information is available on the baseline geochemistry of the coal/sand formation waters and that of the potential disposal zones. No determination was made of the compatibility of these waters. The study also indicates that water is often produced in variable quantities with gas from several gas productive formations which would indicate that there are potential applications for Jack McIntyre`s patented tool in the Piceance Basin.

  12. Final DOE Areas Feasibility Study

    Office of Legacy Management (LM)

    ... To-Be-Considered Guidelines 2-4 2.2.5 Chemical-Specific Requirements 2-4 2.2.6 ... Concern and Remediation Goals Table 2-3. Chemical-Specific Requirements for the LEHR ...

  13. Feasibility study for remedial action for the groundwater operable units at the chemical plant area and the ordnance works area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-07-15

    The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the nature and extent of contamination is presented in Section 1.2, and the results of the BRA are summarized in Section 1.3. The objective of this FS is discussed in Section 1.4, and preliminary remediation goals are identified in Section 1.5. The organization of the remaining chapters of this FS is outlined in Section 1.6.

  14. CO2-Binding Organic Liquids Gas Capture with Polarity-Swing-Assisted Regeneration Full Technology Feasibility Study B1 - Solvent-based Systems

    SciTech Connect (OSTI)

    Heldebrant, David J

    2014-08-31

    PNNL, Fluor Corporation and Queens University (Kingston, ON) successfully completed a three year comprehensive study of the CO2BOL water-lean solvent platform with Polarity Swing Assisted Regeneration (PSAR). This study encompassed solvent synthesis, characterization, environmental toxicology, physical, thermodynamic and kinetic property measurements, Aspen Plus™ modeling and bench-scale testing of a candidate CO2BOL solvent molecule. Key Program Findings The key program findings are summarized as follows: • PSAR favorably reduced stripper duties and reboiler temperatures with little/no impact to absorption column • >90% CO2 capture was achievable at reasonable liquid-gas ratios in the absorber • High rich solvent viscosities (up to 600 cP) were successfully demonstrated in the bench-scale system. However, the projected impacts of high viscosity to capital cost and operational limits compromised the other levelized cost of electricity benefits. • Low thermal conductivity of organics significantly increased the required cross exchanger surface area, and potentially other heat exchange surfaces. • CO2BOL had low evaporative losses during bench-scale testing • There was no evidence of foaming during bench scale testing • Current CO2BOL formulation costs project to be $35/kg • Ecotoxicity (Water Daphnia) was comparable between CO2BOL and MEA (169.47 versus 103.63 mg/L) • Full dehydration of the flue gas was determined to not be economically feasible. However, modest refrigeration (13 MW for the 550 MW reference system) was determined to be potentially economically feasible, and still produce a water-lean condition for the CO2BOLs (5 wt% steady-state water loading). • CO2BOLs testing with 5 wt% water loading did not compromise anhydrous performance behavior, and showed actual enhancement of CO2 capture performance. • Mass transfer of CO2BOLs was not greatly impeded by viscosity • Facile separation of antisolvent from lean CO2BOL was demonstrated on the bench cart • No measurable solvent degradation was observed over 4 months of testing – even with 5 wt% water present

  15. Feasibility studies to establish at the Kazakhstan Ulba metallurgical plant the manufacturing capability to produce low-enriched uranium certified reference materials

    SciTech Connect (OSTI)

    Kuzminski, Jozef; Nesuhoff, J; Cratto, P; Pfennigwerth, G; Mikhailenko, A; Maliutina, I; Nations, J

    2009-01-01

    One of the salient features of the transition plan that the United States Department of Energy/National Nuclear Security Administration (DOE/NNSA) is presently implementing in the Former Soviet Union countries is the availability of uranium certified reference materials for calibration of nondestructive assay (NDA) measurement equipment. To address this challenge, DOE/NNSA and U.S. national laboratories have focused their cooperative efforts on establishing a reliable source for manufacturing, certifying, and supplying of such standards. The Ulba Metallurgical Plant (UMP), Kazakhstan, which processes large quantities of low-enriched uranium to produce ceramic fuel pellets for nuclear-powered reactors, is well situated to become a key supplier of low-enriched uranium certified reference materials for the country and Central Asia region. We have recently completed Phase I of a feasibility study to establish at UMP capabilities of manufacturing these standards. In this paper we will discuss details of a proposed methodology for uranium down-blending, material selection and characterization, and a proposed methodology of measurement by destructive (DA) and non-destructive (NDA) analysis to form a database for material certification by the competent State authorities in the Republic of Kazakhstan. In addition, we will discuss the prospect for manufacturing of such standards at UMP.

  16. Work plan for the remedial investigation/feasibility study-environmental assessment for the quarry residuals operable unit at the Weldon Spring Site

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    The US Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. The Weldon Spring site consists of two noncontiguous areas -- the chemical plant area, which includes four raffinate pits, and the quarry. Cleanup activities at the Weldon Spring site are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, incorporating the values of the National Environmental Policy Act (NEPA). The contents of the documents prepared for the project are not intended to represent a statement regarding the legal applicability of NEPA to remedial actions conducted under CERCLA. In accordance with the integrated CERCLA/NEPA approach, a remedial investigation/feasibility study-environmental assessment (RI/FS-EA) is being conducted to evaluate conditions and potential responses for the quarry residuals operable unit (QROU). This operable unit consists of the following areas and/or media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and bulk waste; underlying groundwater; and other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough. This work plan identifies the activities within the RI/FS-EA process that are being proposed to address contamination remaining at the quarry area.

  17. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

  18. Ultrasonic Nakagami-parameter characterization of parotid-gland injury following head-and-neck radiotherapy: A feasibility study of late toxicity

    SciTech Connect (OSTI)

    Yang, Xiaofeng; Wu, Ning; Wang, Yuefeng; Tridandapani, Srini; School of Electrical and Computer Engineering, Georgia Institute of Technology, Atlanta, Georgia 30332; Winship Cancer Institute, Emory University, Atlanta, Georgia 30322 ; Beitler, Jonathan J.; Yu, David S.; Curran, Walter J.; Liu, Tian; Bruner, Deborah W.; Winship Cancer Institute, Emory University, Atlanta, Georgia 30322; School of Nursing, Emory University, Atlanta, Georgia 30322

    2014-02-15

    Purpose: The study aims to investigate whether Nakagami parametersestimated from the statistical distribution of the backscattered ultrasound radio-frequency (RF) signalscould provide a means for quantitative characterization of parotid-gland injury resulting from head-and-neck radiotherapy. Methods: A preliminary clinical study was conducted with 12 postradiotherapy patients and 12 healthy volunteers. Each participant underwent one ultrasound study in which ultrasound scans were performed in the longitudinal, i.e., vertical orientation on the bilateral parotids. For the 12 patients, the mean radiation dose to the parotid glands was 37.7 9.5 Gy, and the mean follow-up time was 16.3 4.8 months. All enrolled patients experienced grade 1 or 2 late salivary-gland toxicity (RTOG/EORTC morbidity scale). The normal parotid glands served as the control group. The Nakagami-scaling and Nakagami-shape parameters were computed from the RF data to quantify radiation-induced parotid-gland changes. Results: Significant differences in Nakagami parameters were observed between the normal and postradiotherapy parotid glands. Compared with the control group, the Nakagami-scaling parameter of the postradiotherapy group decreased by 25.8% (p < 0.001), and the Nakagami-shape parameter decreased by 31.3% (p < 0.001). The area under the receiver operating characteristic curve was 0.85 for the Nakagami-scaling parameter and was 0.95 for the Nakagami-shape parameter, which further demonstrated the diagnostic efficiency of the Nakagami parameters. Conclusions: Nakagami parameters could be used to quantitatively measure parotid-gland injury following head-and-neck radiotherapy. Moreover, the clinical feasibility was demonstrated and this study provides meaningful preliminary data for future clinical investigation.

  19. Feasibility Study on the Use of On-line Multivariate Statistical Process Control for Safeguards Applications in Natural Uranium Conversion Plants

    SciTech Connect (OSTI)

    Ladd-Lively, Jennifer L

    2014-01-01

    The objective of this work was to determine the feasibility of using on-line multivariate statistical process control (MSPC) for safeguards applications in natural uranium conversion plants. Multivariate statistical process control is commonly used throughout industry for the detection of faults. For safeguards applications in uranium conversion plants, faults could include the diversion of intermediate products such as uranium dioxide, uranium tetrafluoride, and uranium hexafluoride. This study was limited to a 100 metric ton of uranium (MTU) per year natural uranium conversion plant (NUCP) using the wet solvent extraction method for the purification of uranium ore concentrate. A key component in the multivariate statistical methodology is the Principal Component Analysis (PCA) approach for the analysis of data, development of the base case model, and evaluation of future operations. The PCA approach was implemented through the use of singular value decomposition of the data matrix where the data matrix represents normal operation of the plant. Component mole balances were used to model each of the process units in the NUCP. However, this approach could be applied to any data set. The monitoring framework developed in this research could be used to determine whether or not a diversion of material has occurred at an NUCP as part of an International Atomic Energy Agency (IAEA) safeguards system. This approach can be used to identify the key monitoring locations, as well as locations where monitoring is unimportant. Detection limits at the key monitoring locations can also be established using this technique. Several faulty scenarios were developed to test the monitoring framework after the base case or normal operating conditions of the PCA model were established. In all of the scenarios, the monitoring framework was able to detect the fault. Overall this study was successful at meeting the stated objective.

  20. Feasibility Study of Biopower in East Helena, Montana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Moriarty, K.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to reuse contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former American Smelting and Refining Company (Asarco) smelter in East Helena, Montana, was selected for a feasibility study under the initiative. Biomass was chosen as the renewable energy resource based on the wood products industry in the area. Biopower was selected as the technology based on Montana's renewable portfolio standard (RPS) requiring utilities to purchase renewable power.

  1. Feasibility Study of Anaerobic Digestion of Food Waste in St. Bernard, Louisiana. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Moriarty, K.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA) developed the RE-Powering America's Land initiative to re-use contaminated sites for renewable energy generation when aligned with the community's vision for the site. The former Kaiser Aluminum Landfill in St. Bernard Parish, Louisiana, was selected for a feasibility study under the program. Preliminary work focused on selecting a biomass feedstock. Discussions with area experts, universities, and the project team identified food wastes as the feedstock and anaerobic digestion (AD) as the technology.

  2. Feasibility study for a 10-MM-GPY fuel ethanol plant, Brady Hot Springs, Nevada. Volume 1. Process and plant design

    SciTech Connect (OSTI)

    Not Available

    1980-09-01

    An investigation was performed to determine the technical and economic viability of constructing and operating a geothermally heated, biomass, motor fuel alcohol plant at Brady's Hot Springs. The results of the study are positive, showing that a plant of innovative, yet proven design can be built to adapt current commerical fermentation-distillation technology to the application of geothermal heat energy. The specific method of heat production from the Brady's Hot Spring wells has been successful for some time at an onion drying plant. Further development of the geothermal resource to add the capacity needed for an ethanol plant is found to be feasible for a plant sized to produce 10 million gallons of motor fuel grade ethanol per year. A very adequate supply of feedgrains is found to be available for use in the plant without impact on the local or regional feedgrain market. The effect of diverting supplies from the animal feedlots in Northern Nevada and California will be mitigated by the by-product output of high-protein feed supplements that the plant will produce. The plant will have a favorable impact on the local farming economies of Fallon, Lovelock, Winnemucca and Elko, Nevada. It will make a positive and significant socioeconomic contribution to Churchill County, providing direct employment for an additional 61 persons. Environmental impact will be negligible, involving mostly a moderate increase in local truck traffic and railroad siding activity. The report is presented in two volumes. Volume 1 deals with the technical design aspects of the plant. The second volume addresses the issue of expanded geothermal heat production at Brady's Hot Springs, goes into the details of feedstock supply economics, and looks at the markets for the plant's primary ethanol product, and the markets for its feed supplement by-products. The report concludes with an analysis of the economic viability of the proposed project.

  3. Hualapai Wind Project Feasibility Report

    SciTech Connect (OSTI)

    Davidson, Kevin; Randall, Mark; Isham, Tom; Horna, Marion J; Koronkiewicz, T; Simon, Rich; Matthew, Rojas; MacCourt, Doug C.; Burpo, Rob

    2012-12-20

    The Hualapai Department of Planning and Economic Development, with funding assistance from the U.S. Department of Energy, Tribal Energy Program, with the aid of six consultants has completed the four key prerequisites as follows: 1. Identify the site area for development and its suitability for construction. 2. Determine the wind resource potential for the identified site area. 3. Determine the electrical transmission and interconnection feasibility to get the electrical power produced to the marketplace. 4. Complete an initial permitting and environmental assessment to determine the feasibility for getting the project permitted. Those studies indicated a suitable wind resource and favorable conditions for permitting and construction. The permitting and environmental study did not reveal any fatal flaws. A review of the best power sale opportunities indicate southern California has the highest potential for obtaining a PPA that may make the project viable. Based on these results, the recommendation is for the Hualapai Tribal Nation to move forward with attracting a qualified wind developer to work with the Tribe to move the project into the second phase - determining the reality factors for developing a wind project. a qualified developer will bid to a utility or negotiate a PPA to make the project viable for financing.

  4. Summary of Investigations on Technical Feasibility of Direct...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The 3-year study concludes that direct disposal is technically feasible for most DPCs, depending on the repository host geology. Thermal management and postclosure criticality ...

  5. Background studies in support of a feasibility assessment on the use of copper-base materials for nuclear waste packages in a repository in tuff

    SciTech Connect (OSTI)

    Van Konynenburg, R.A.; Kundig, K.J.A.; Lyman, W.S.; Prager, M.; Meyers, J.R.; Servi, I.S.

    1990-06-01

    This report combines six work units performed in FY`85--86 by the Copper Development Association and the International Copper Research Association under contract with the University of California. The work includes literature surveys and state-of-the-art summaries on several considerations influencing the feasibility of the use of copper-base materials for fabricating high-level nuclear waste packages for the proposed repository in tuff rock at Yucca Mountain, Nevada. The general conclusion from this work was that copper-base materials are viable candidates for inclusion in the materials selection process for this application. 55 refs., 48 figs., 22 tabs.

  6. A feasibility study for the application of radiation monitoring for international safeguards at an Atomic Vapor Laser Isotope Separation (AVLIS) facility

    SciTech Connect (OSTI)

    Miller, M.C.; Adams, E.L.; Li, T.K.; Strittmatter, R.B.

    1994-09-01

    The authors evaluated the feasibility of using radiation monitoring for international safeguards at an Atomic Vapor Laser Isotope Separation (AVLIS) uranium enrichment facility. Techniques employing neutron and gamma-ray detection were investigated and evaluated to determine their applicability for detecting highly enriched uranium. This task is complicated because classified information must not be revealed in the inspection activity. Within this constraint, the authors concluded that (1) neutron methods will not be a viable option for measurements at the separator module, (2) gamma-ray measurements at the separator module are possible but cannot be adequately verified, and (3) neutron and gamma-ray approaches are suitable for measurements of feed, product, and tails. If international safeguards are applied at an AVLIS facility, neutron and gamma-ray instruments will need to be designed and optimized.

  7. Feasibility of utilizing apple pomace

    SciTech Connect (OSTI)

    Stapleton, J.

    1983-06-01

    Apple pomace, the solid residue from juice production, is a solid waste problem in the Hudson Valley. This study investigates possibilities for converting it to a resource. The characteristics of the region's apple growing and processing industries are examined at length, including their potential for converting waste biomass. The properties of apple pomace are described. From interviews with Hudson Valley apple processors the following information is presented: quantities of pomace produced; seasonality of production; disposal procedures, costs, and revenues; trends in juice production; and attitudes toward alternatives. Literature research resulted in a list of more than 25 end uses for apple pomace of which eight were selected for analysis. Landfilling, landspreading, composting, animal feed, direct burning, gasification, anaerobic digestion (methane generation), and fermentation (ethanol production) were analyzed with regard to technical availability, regulatory and environmental impact, attitudes toward end use, and energetic and economic feasibility (See Table 19). The study recommends (1) a pilot anaerobic digestion plant be set up, (2) the possibility of extracting methane from the Marlborough landfill be investigated, (3) a study of the mid-Hudson waste conversion potential be conducted, and (4) an education program in alternative waste management be carried out for the region's industrial and agricultural managers.

  8. Supplemental feasibility study for remedial action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1999-08-06

    Site data evaluated indicate that after source removal, dilution and dispersion appear to be the primary processes that would further attenuate groundwater contaminant concentrations. On the basis of these attenuation processes, the calculations presented in Chapter 2 indicate that it would take several years to decades (approximately 60 to 150 and 14 years, respectively, for Zones 1 and 2) for TCE concentrations in Zones 1 and 2 to attenuate to the MCL (or ARAR) of 5 pg/L. The estimates for Zones 1 through 3, where the higher nitrate concentrations are clustered, indicate that it would likely take at least 80 years for nitrate concentrations to attenuate to the MCL (or ARAR) of 10 mg/L. Costs for implementing NINA for groundwater at the chemical plant area are primarily associated with those incurred for monitoring contaminant concentrations and the replacement costs for monitoring wells. Cost estimates are relatively high because a rather lengthy period of monitoring would be involved. Calculations performed to evaluate the feasibility of groundwater removal and subsequent treatment of the extracted water included determinations for the number of extraction wells needed, required number of pore volumes, and the number of years of implementation required to attain bench marks. The calculations were performed per zone of contamination, as discussed in Chapter 1. Several observations can be made about the results presented in Chapter 3 regarding Alternative 4. The first is that by looking at the results for Zones 1 and 2 evaluated under Alternative 4, one can also assess the feasibility of Alternative 7, because Alternative 7 addresses this particular subset of Alternative 4 (i.e., Zones 1 and 2). TCE contamination has been observed in Zones 1 and 2, but has not been reported in any of the remaining five zones. Nitrate, nitroaromatic compounds, and uranium have also been reported in Zones 1 and 2. The present-worth costs for implementing the pump and treat alternative in Zones 1 and 2 constitute the major component of the overall present-worth cost for Alternative 4, which indicates that the cost for Alternative 7 would be similarly high. Another observation is that although estimated times are shorter for the pump and treat approach than those for MNA, pump and treat for Zones 1 and 2 likely would take several decades (at least 30 years) to attain ARARs or bench marks. The cost estimates (in present-worth costs) for Alternatives 4 and 7 are much higher (approximately an order of magnitude higher) than those for Alternative 3.

  9. mhtml:file://H:\CATX\APPROVED-CXS\EERE FOA 1201 - Rankine Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    . ., . . BNL-68599 PRODUCTION OF RADIOACTIVE IODINE David J. Schlyer Iodine-123 Probably the most 'widely used cyclotron produced radiohalogen is 1-123. It has gradually replaced I-13 1 as the isotope of choice for diagnostic radiopharmaceuticals containing radioiodine. It gives a much lower radiation dose to the patient and the gamma ray energy of 159 keV is ideally suited for use in a gamma camera. The gamma ray will penetrate tissue very effectively without excessive radiation dose. For this

  10. Feasibility studies for the development of petroleum areas. Integrated exploitation project of the fields in the area north of Santa Cruz. Volume 2. Tables and figures. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1991-03-01

    The report, generated by Scientific Software-Intercomp, Inc. for Yacimientos Petroliferos Fiscales Bolivianos, documents the results of a feasibility study which addressed the viability of developing petroleum areas in Bolivia. The primary objective of the project was to describe the reservoirs that have been discovered and their reserves, describe which would be the best alternatives for development of these reservoirs, and to determine the best alternatives for development of all the reserves together. The report, volume 2 of 4 contains Tables and Figures.

  11. Feasibility of a digester gas fuel production facility

    SciTech Connect (OSTI)

    Dakes, G.; Greene, D.S.; Sheehan, J.F.

    1982-03-01

    Results of studies on the feasibility of using digester gas produced from wastewater sludge to fuel vehicles are reported. Availability and suitability of digester gas as well as digester gas production records and test analyses on digester gas were reviewed. The feasibility of the project based on economic and environmental considerations is reported and compared to possible alternative uses of the digester gas.

  12. Energy Efficiency in Separate Tenant Spaces … A Feasibility...

    Broader source: Energy.gov (indexed) [DOE]

    Study E X E C U T I V E S U M M A R Y Energy Efficiency in Separate Tenant Spaces - A Feasibility Study 1 Executive Summary Commercial buildings account for 20% of energy used in ...

  13. TU-C-BRE-04: 3D Gel Dosimetry Using ViewRay On-Board MR Scanner: A Feasibility Study

    SciTech Connect (OSTI)

    Zhang, L; Du, D; Green, O; Rodriguez, V; Wooten, H; Xiao, Z; Yang, D; Hu, Y; Li, H

    2014-06-15

    Purpose: MR based 3D gel has been proposed for radiation therapy dosimetry. However, access to MR scanner has been one of the limiting factors for its wide acceptance. Recent commercialization of an on-board MR-IGRT device (ViewRay) may render the availability issue less of a concern. This work reports our attempts to simulate MR based dose measurement accuracy on ViewRay using three different gels. Methods: A spherical BANG gel dosimeter was purchased from MGS Research. Cylindrical MAGIC gel and Fricke gel were fabricated in-house according to published recipes. After irradiation, BANG and MAGIC were imaged using a dual-echo spin echo sequence for T2 measurement on a Philips 1.5T MR scanner, while Fricke gel was imaged using multiple spin echo sequences. Difference between MR measured and TPS calculated dose was defined as noise. The noise power spectrum was calculated and then simulated for the 0.35 T magnetic field associated with ViewRay. The estimated noise was then added to TG-119 test cases to simulate measured dose distributions. Simulated measurements were evaluated against TPS calculated doses using gamma analysis. Results: Given same gel, sequence and coil setup, with a FOV of 1809090 mm3, resolution of 333 mm3, and scanning time of 30 minutes, the simulated measured dose distribution using BANG would have a gamma passing rate greater than 90% (3%/3mm and absolute). With a FOV 1809090 mm3, resolution of 445 mm3, and scanning time of 45 minutes, the simulated measuremened dose distribution would have a gamma passing rate greater than 97%. MAGIC exhibited similar performance while Fricke gel was inferior due to much higher noise. Conclusions: The simulation results demonstrated that it may be feasible to use MAGIC and BANG gels for 3D dose verification using ViewRay low-field on-board MRI scanner.

  14. SU-E-J-104: Single Photon Image From PET with Insertable SPECT Collimator for Boron Neutron Capture Therapy: A Feasibility Study

    SciTech Connect (OSTI)

    Jung, J; Yoon, D; Suh, T

    2014-06-01

    Purpose: The aim of our proposed system is to confirm the feasibility of extraction of two types of images from one positron emission tomography (PET) module with an insertable collimator for brain tumor treatment during the BNCT. Methods: Data from the PET module, neutron source, and collimator was entered in the Monte Carlo n-particle extended (MCNPX) source code. The coincidence events were first compiled on the PET detector, and then, the events of the prompt gamma ray were collected after neutron emission by using a single photon emission computed tomography (SPECT) collimator on the PET. The obtaining of full width at half maximum (FWHM) values from the energy spectrum was performed to collect effective events for reconstructed image. In order to evaluate the images easily, five boron regions in a brain phantom were used. The image profiles were extracted from the region of interest (ROI) of a phantom. The image was reconstructed using the ordered subsets expectation maximization (OSEM) reconstruction algorithm. The image profiles and the receiver operating characteristic (ROC) curve were compiled for quantitative analysis from the two kinds of reconstructed image. Results: The prompt gamma ray energy peak of 478 keV appeared in the energy spectrum with a FWHM of 41 keV (6.4%). On the basis of the ROC curve in Region A to Region E, the differences in the area under the curve (AUC) of the PET and SPECT images were found to be 10.2%, 11.7%, 8.2% (center, Region C), 12.6%, and 10.5%, respectively. Conclusion: We attempted to acquire the PET and SPECT images simultaneously using only PET without an additional isotope. Single photon images were acquired using an insertable collimator on a PET detector. This research was supported by the Leading Foreign Research Institute Recruitment Program through the National Research Foundation of Korea (NRF) funded by the Ministry of Science, Information and Communication Technologies (ICT) and Future Planning (MSIP)(Grant No.2009 00420) and the Radiation Technology R and D program (Grant No.2013M2A2A7043498), Republic of Korea.

  15. Clean Energy Manufacturing Resources - Technology Feasibility | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Feasibility Clean Energy Manufacturing Resources - Technology Feasibility Clean Energy Manufacturing Resources - Technology Feasibility Find resources to help you evaluate the feasibility of your idea for a new clean energy technology or product. For determining feasibility, areas to consider include U.S. Department of Energy (DOE) priorities, licensing, R&D funding, and strategic project partnerships. For more resources, see the Clean Energy Manufacturing Federal Resource

  16. Fort Bidwell Indian Community - Geothermal Direct Use Feasibility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ft. Bidwell Indian Reservation GEOTHERMAL District Heating Feasibility Study Tribal Energy Program, September 25, 2006 35 Buildings 53,000 sq ft 13.3 gpm ave N A C A L F O R I I ...

  17. Feasibility study for the construction of a new LNG receiving terminal, turkey. Volume 2. Appendix. Export trade information. [LNG (liquified natural gas)

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The report was prepared by The M. W. Kellogg Co. for BOTAS Petroleum Pipeline Corporation of Ankara, Turkey. The study was undertaken to evaluate the cost and economics of constructing a second liquified natural gas (LNG) terminal in Turkey to meet future requirements for natural gas. Volume 2 contains the following appendices: LNG Storage Tanks; Vaporizers; Compressors; Pumps; Loading Arms; Marine Installations; Shipping; and Seismic Study.

  18. Feasibility studies for the development of petroleum areas-integrated exploitation project of the fields in the area north of Santa Cruz. Volume 1. Text. Export trade information (Final)

    SciTech Connect (OSTI)

    Not Available

    1991-03-01

    The report, generated by Scientific Software-Intercomp, Inc. for Yacimientos Petroliferos Fiscales Bolivianos, documents the results of a feasibility study which addressed the viability of developing petroleum areas in Bolivia. The primary objective of the project was to describe the reservoirs that have been discovered and their reserves, describe which would be the best alternatives for development of these reservoirs, and to determine the best alternatives for development of all the reserves together. The report, volume 1 of 4, contains the main text which discusses: Objectives and Scope; Deliverables; Geology (Well Logs, Core Data, Dipmeters, Mudlogs, Database and Data Availability Problems, Procedure, Mapping, Results, Stratigraphic Considerations); and Petrophysics (Objectives, Database Preparation, Core Data Analysis, Log Normalization, Parameter Selection, Log Processing and Results, Reservoir Summation, Conclusions and Recommendations, Production Engineering, Reservoir Engineering and Simulation, Pipeline and Facilities Design, Economics).

  19. Feasibility study for reconstruction of the reheat furnaces for the 2000 Hot Strip Mill (Novolipetsk Steel Works, Lipetsk, Russia): Final report. Export trade information

    SciTech Connect (OSTI)

    1997-05-01

    The objective of this study was to develop a furnace design that would be instrumental in advancing the NLMK 2000 Hot Strip Mill to a level of world class strip mills capable of producing high quality strip with improved energy efficiency and minimal environmental impact. The contents include the following: (1) executive summary; (2) capital cost assessment; (3) project financial analysis; (4) study overview; (5) basic furnace design; (6) silicon design specification; (7) utilities; (8) NOx reduction technologies for reheat furnaces; (9) site investigation and construction schedule; (10) hot connect.

  20. Feasibility study for lowering the minimum gas pressure in solution-mined caverns based on geomechanical analyses of creep-induced damage and healing

    SciTech Connect (OSTI)

    Ratigan, J.L.; Nieland, J.D.; Devries, K.L.

    1998-12-31

    Geomechanical analyses were made to determine the minimum gas pressure allowable based on an existing stress-based criterion (Damage Potential) and an advanced constitutive model (MDCF model) capable of quantifying the level of damage and healing in rock salt. The MDCF model is a constitutive model developed for the WIPP to provide a continuum description of the dislocation and damage deformation of salt. The purpose of this study was to determine if the MDCF model is applicable for evaluating the minimum gas pressure of CNG storage caverns. Specifically, it was to be determined if this model would predict that the minimum gas pressure in the caverns could be lowered without compromising the stability of the cavern. Additionally, the healing behavior of the salt was analyzed to determine if complete healing of the damaged rock zone would occur during the period the cavern was at maximum gas pressure. Significant findings of this study are reported.

  1. Design and Feasibility Assessment of a Retrospective Epidemiological Study of Coal-Fired Power Plant Emissions in the Pittsburgh Pennsylvania Region

    SciTech Connect (OSTI)

    Richard A. Bilonick; Daniel Connell; Evelyn Talbott; Jeanne Zborowski; Myoung Kim

    2006-12-20

    Eighty-nine (89) percent of the electricity supplied in the 35-county Pittsburgh region (comprising parts of the states of Pennsylvania, Ohio, West Virginia, and Maryland) is generated by coal-fired power plants making this an ideal region in which to study the effects of the fine airborne particulates designated as PM{sub 2.5} emitted by the combustion of coal. This report demonstrates that during the period from 1999-2006 (1) sufficient and extensive exposure data, in particular samples of speciated PM{sub 2.5} components from 1999 to 2003, and including gaseous co-pollutants and weather have been collected, (2) sufficient and extensive mortality, morbidity, and related health outcomes data are readily available, and (3) the relationship between health effects and fine particulates can most likely be satisfactorily characterized using a combination of sophisticated statistical methodologies including latent variable modeling (LVM) and generalized linear autoregressive moving average (GLARMA) time series analysis. This report provides detailed information on the available exposure data and the available health outcomes data for the construction of a comprehensive database suitable for analysis, illustrates the application of various statistical methods to characterize the relationship between health effects and exposure, and provides a road map for conducting the proposed study. In addition, a detailed work plan for conducting the study is provided and includes a list of tasks and an estimated budget. A substantial portion of the total study cost is attributed to the cost of analyzing a large number of archived PM{sub 2.5} filters. Analysis of a representative sample of the filters supports the reliability of this invaluable but as-yet untapped resource. These filters hold the key to having sufficient data on the components of PM{sub 2.5} but have a limited shelf life. If the archived filters are not analyzed promptly the important and costly information they contain will be lost.

  2. Geology and geohydrology of the Palo Duro Basin, Texas Panhandle. Report on the progress of nuclear waste isolation feasibility studies, 1979

    SciTech Connect (OSTI)

    Gustavson, T.C.; Presley, M.W.; Handford, C.R.; Finley, R.J.; Dutton, S.P.; Baumgardner, R.W. Jr.; McGillis, K.A.; Simpkins, W.W.

    1980-01-01

    Since early 1977, the Bureau of Economic Geology has been evaluating several salt-bearing basins within the State of Texas as part of the national nuclear repository program. The Bureau, a research unit of The University of Texas at Austin and the State of Texas, is carrying out a long-term program to gather and interpret all geologic and hydrologic information necessary for description, delineation, and evaluation of salt-bearing strata in the Palo Duro and Dalhart Basins of the Texas Panhandle. The program in FY 79 has been subdivided into four broad research tasks, which are addressed by a basin analysis group, a surface studies group, a geohydrology group, and a host-rock analysis group. The basin analysis group has delineated the structural and stratigraphic framework of the basins, initiated natural resource assessment, and integrated data from 8000 ft (2400 m) of core material into salt-stratigraphy models. Salt depth and thickness have been delineated for seven salt-bearing stratigraphic units. Concurrently, the surface studies group has collected ground and remotely sensed data to describe surficial processes, including salt solution, slope retreat/erosion mechanisms, geomorphic evolution, and fracture system development. The basin geohydrology group has begun evaluating both shallow and deep fluid circulation within the basins. The newly formed host-rock analysis group has initiated study of cores from two drilling sites for analysis of salt and the various lithologies overlying and interbedded with salt units. This paper, a summary report of progress in FY 79, presents principal conclusions and reviews methods used and types of data and maps generated.

  3. Feasibility study for the construction of a new LNG receiving terminal. Turkey. Volume 1. Export trade information. [LNG (liquified natural gas)

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The report was prepared by The M. W. Kellogg Co. for BOTAS Petroleum Pipeline Corporation of Ankara, Turkey. The study was undertaken to evaluate the cost and economics of constructing a second liquified natural gas (LNG) terminal in Turkey to meet future requirements for natural gas. Volume 1 is divided into the following sections: (1) Introduction; (2) Summary and Conclusions; (3) Design Basis; (4) Site Evaluation; (5) LNG Terminal Design; (6) Major Equipment and Instrumentation; (7) Marine Operations; (8) Safety Considerations; (9) Environmental Review; (10) Preliminary Project Execution Strategy; (11) Cost Estimates; (12) Project Master Schedule; (13) Economic Analysis; (14) Financing; (15) Future Work.

  4. The feasibility study of small long-life gas cooled fast reactor with mixed natural Uranium/Thorium as fuel cycle input

    SciTech Connect (OSTI)

    Ariani, Menik; Su'ud, Zaki; Waris, Abdul; Khairurrijal,; Monado, Fiber; Sekimoto, Hiroshi

    2012-06-06

    A conceptual design study of Gas Cooled Fast Reactors with Modified CANDLE burn-up scheme has been performed. In this study, design GCFR with Helium coolant which can be continuously operated by supplying mixed Natural Uranium/Thorium without fuel enrichment plant or fuel reprocessing plant. The active reactor cores are divided into two region, Thorium fuel region and Uranium fuel region. Each fuel core regions are subdivided into ten parts (region-1 until region-10) with the same volume in the axial direction. The fresh Natural Uranium and Thorium is initially put in region-1, after one cycle of 10 years of burn-up it is shifted to region-2 and the each region-1 is filled by fresh natural Uranium/Thorium fuel. This concept is basically applied to all regions in both cores area, i.e. shifted the core of i{sup th} region into i+1 region after the end of 10 years burn-up cycle. For the next cycles, we will add only Natural Uranium and Thorium on each region-1. The calculation results show the reactivity reached by mixed Natural Uranium/Thorium with volume ratio is 4.7:1. This reactor can results power thermal 550 MWth. After reactor start-up the operation, furthermore reactor only needs Natural Uranium/Thorium supply for continue operation along 100 years.

  5. Final Report and Strategic Plan on the Feasibility Study to Assess Geothermal Potential on Warm Springs Reservation Lands. Report No. DOE/GO/15177

    SciTech Connect (OSTI)

    James Manion, Warm Springs Power & Water Enterprises; David McClain, McClain & Associates

    2007-05-17

    In 2005 the Confederated Tribes of Warm Springs Tribal Council authorized an evaluation of the geothermal development potential on the Confederated Tribes of Warm Springs Reservation of Oregon. Warm Springs Power & Water Enterprises obtained a grant from the U.S. Department of Energy to conduct a geological assessment and development estimate. Warm Springs Power & Water Enterprises utilized a team of expert consultants to conduct the study and develop a strategic plan. The resource assessment work was completed in 2006 by GeothermEx Inc., a consulting company specializing in geothermal resource assessments worldwide. The GeothermEx report indicates there is a 90% probability that a commercial geothermal resource exists on tribal lands in the Mt. Jefferson area. The geothermal resource assessment and other cost, risk and constraints information has been incorporated into the strategic plan.

  6. SU-E-T-12: A Feasibility Study of Patient Specific QA Using Gafchromic Film of Dynamic Feathering in Junctions of Craniospinal Irradiation

    SciTech Connect (OSTI)

    Stanford, J; Duggar, W; Yang, C

    2014-06-01

    Purpose: Cranio-spinal irradiation is the most complicated format of the conventional external beam radiation therapy because it involves matches of non-coplanar beams which are susceptible to daily setup errors. This study explores the efficacy of Gafchromic film dosimetry to quantitatively verify the junctions for cranio-spinal radiation feathered with field in field technique. Methods: 15cm in thickness of solid water phantom was scanned vertically and exported to the Pinnacle TPS as primary phantom data set. A patient cranio-spinal plan, consisted of two bilateral whole brain beams dynamically matched with a posterior spinal beam using field in field technique, was transferred to the phantom and recalculated for one fraction with set monitor units identical to the original plan. Next, planar dose distribution on the phantom was exported to the FilmQA Pro 2013 software (Ashland, Inc.) in binary format for comparison with the measured dose distribution. An EBT2 film was sandwiched in the middle of the phantom and the phantom was set up according to the QA plan based on the room laser system. The shifts instructions associated with the patient original plan were made and the beams from the patient original plan delivered to the solid water phantom via the record and verify system in QA mode. The dose distribution from the measured film was compared with the planned reference distribution using gamma analysis and profile comparison. Results: Gamma passing rate of 91 % with DTA 3mm and 5% dose difference was obtained within the junction region, significantly greater passing rate above 95 % was obtained in the homogeneous region of the brain field. Conclusion: This study confirms that Gafchromic film dosimetry can be used to validate the efficacy of FIF feathering technique for cranio-spinal treatment. FIF technique with Gafchromic dosimetry may now be the new standard for delivering efficient and accurate cranio-spinal radiation with confidence.

  7. Fully Automated Simultaneous Integrated Boosted-Intensity Modulated Radiation Therapy Treatment Planning Is Feasible for Head-and-Neck Cancer: A Prospective Clinical Study

    SciTech Connect (OSTI)

    Wu Binbin; McNutt, Todd; Zahurak, Marianna; Simari, Patricio; Pang, Dalong; Taylor, Russell; Sanguineti, Giuseppe

    2012-12-01

    Purpose: To prospectively determine whether overlap volume histogram (OVH)-driven, automated simultaneous integrated boosted (SIB)-intensity-modulated radiation therapy (IMRT) treatment planning for head-and-neck cancer can be implemented in clinics. Methods and Materials: A prospective study was designed to compare fully automated plans (APs) created by an OVH-driven, automated planning application with clinical plans (CPs) created by dosimetrists in a 3-dose-level (70 Gy, 63 Gy, and 58.1 Gy), head-and-neck SIB-IMRT planning. Because primary organ sparing (cord, brain, brainstem, mandible, and optic nerve/chiasm) always received the highest priority in clinical planning, the study aimed to show the noninferiority of APs with respect to PTV coverage and secondary organ sparing (parotid, brachial plexus, esophagus, larynx, inner ear, and oral mucosa). The sample size was determined a priori by a superiority hypothesis test that had 85% power to detect a 4% dose decrease in secondary organ sparing with a 2-sided alpha level of 0.05. A generalized estimating equation (GEE) regression model was used for statistical comparison. Results: Forty consecutive patients were accrued from July to December 2010. GEE analysis indicated that in APs, overall average dose to the secondary organs was reduced by 1.16 (95% CI = 0.09-2.33) with P=.04, overall average PTV coverage was increased by 0.26% (95% CI = 0.06-0.47) with P=.02 and overall average dose to the primary organs was reduced by 1.14 Gy (95% CI = 0.45-1.8) with P=.004. A physician determined that all APs could be delivered to patients, and APs were clinically superior in 27 of 40 cases. Conclusions: The application can be implemented in clinics as a fast, reliable, and consistent way of generating plans that need only minor adjustments to meet specific clinical needs.

  8. Feasibility Study of Economics and Performance of Biopower at the Chanute Air Force Base in Rantoul, Illinois. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Scarlata, C.; Mosey, G.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chanute Air Force Base site in Rantoul, Illinois, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this study was to assess the site for a possible biopower system installation and estimate the cost, performance, and impacts of different biopower options.

  9. Systems study of the feasibility of high-level nuclear-waste fractionation for thermal stress control in a geologic repository: main report

    SciTech Connect (OSTI)

    McKee, R.W.; Elder, H.K.; McCallum, R.F.; Silviera, D.J.; Swanson, J.L.; Wiles, L.E.

    1983-06-01

    This study assesses the benefits and costs of fractionating the cesium and strontium (Cs/Sr) components in commercial high-level waste (HLW) to a separate waste stream for the purpose of reducing geologic-repository thermal stresses in the region of the HLW. System costs are developed for a broad range of conditions comparing the Cs/Sr fractionation concept with disposal of 10-year-old vitrified HLW and vitrified HLW aged to achieve (through decay) the same heat output as the fractionated high-level waste (FHLW). All comparisons are based on a 50,000 metric ton equivalent (MTE) system. The FHLW and the Cs/Sr waste are both disposed of as vitrified waste but emplaced in separate areas of a basalt repository. The FHLW is emplaced in high-integrity packages at relatively high waste loading but low heat loading, while the Cs/Sr waste is emplaced in minimum-integrity packages at relatively high heat loading in a separate region of the repository. System cost comparisons are based on minimum cost combinations of canister diameter, waste concentration, and canister spacing in a basalt repository. The effects on both long- and near-term safety considerations are also addressed. The major conclusion is that the Cs/Sr fractionation concept offers the prospect of a substantial total system cost advantage for HLW disposal if reduced HLW package temperatures in a basalt repository are desired. However, there is no cost advantage if currently designated maximum design temperatures are acceptable. Aging the HLW for 50 to 100 years can accomplish similar results at equivalent or lower costs. 37 figures, 58 tables.

  10. 3D inpatient dose reconstruction from the PET-CT imaging of {sup 90}Y microspheres for metastatic cancer to the liver: Feasibility study

    SciTech Connect (OSTI)

    Fourkal, E.; Veltchev, I.; Lin, M.; Meyer, J.; Koren, S.; Doss, M.; Yu, J. Q.

    2013-08-15

    Purpose: The introduction of radioembolization with microspheres represents a significant step forward in the treatment of patients with metastatic disease to the liver. This technique uses semiempirical formulae based on body surface area or liver and target volumes to calculate the required total activity for a given patient. However, this treatment modality lacks extremely important information, which is the three-dimensional (3D) dose delivered by microspheres to different organs after their administration. The absence of this information dramatically limits the clinical efficacy of this modality, specifically the predictive power of the treatment. Therefore, the aim of this study is to develop a 3D dose calculation technique that is based on the PET imaging of the infused microspheres.Methods: The Fluka Monte Carlo code was used to calculate the voxel dose kernel for {sup 90}Y source with voxel size equal to that of the PET scan. The measured PET activity distribution was converted to total activity distribution for the subsequent convolution with the voxel dose kernel to obtain the 3D dose distribution. In addition, dose-volume histograms were generated to analyze the dose to the tumor and critical structures.Results: The 3D inpatient dose distribution can be reconstructed from the PET data of a patient scanned after the infusion of microspheres. A total of seven patients have been analyzed so far using the proposed reconstruction method. Four patients underwent treatment with SIR-Spheres for liver metastases from colorectal cancer and three patients were treated with Therasphere for hepatocellular cancer. A total of 14 target tumors were contoured on post-treatment PET-CT scans for dosimetric evaluation. Mean prescription activity was 1.7 GBq (range: 0.583.8 GBq). The resulting mean maximum measured dose to targets was 167 Gy (range: 71311 Gy). Mean minimum dose to 70% of target (D70) was 68 Gy (range: 25155 Gy). Mean minimum dose to 90% of target (D90) was 53 Gy (range: 13125 Gy).Conclusions: A three-dimensional inpatient dose reconstruction method has been developed that is based on the PET/CT data of a patient treated with {sup 90}Y microspheres. It allows for a complete description of the absorbed dose by the tumor and critical structures. It represents the first step in building predictive models for treatment outcomes for patients receiving this therapeutic modality as well as it allows for better analysis of patients' dose response and will ultimately improve future treatment administration.

  11. Fort Belknap Indian Community - Wind Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The new fort served as a trading post and Chinook, Montana. The new fort served as a trading post and became the government agency for the became the government agency for the Gros ...

  12. Fort Belknap Indian Community Wind Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fort Belknap was established in 1869 near the present town of Chinook, Montana. The new fort served as a trading post and became the government agency for the Gros Ventre and ...

  13. Kenaitze Indian Tribe - Renewable Energy Feasibility Study

    Energy Savers [EERE]

    Kelly Visconti About Us Kelly Visconti - Technology Manager, Advanced Manufacturing Office Most Recent Designing the Future of Advanced Composites Manufacturing June 24

    Ken Salazar About Us Ken Salazar - Secretary of the Interior Ken Salazar Ken Salazar, a fifth-generation Coloradan, was confirmed as the 50th secretary of the U.S. Department of the Interior on Jan. 20, 2009, in a unanimous vote by the U.S. Senate. Prior to his confirmation, Salazar served as Colorado's 35th U.S. senator,

  14. Pascua Yaqui Tribe Solar Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    significantly * Conventional energy pricing steadily rising 3 TORTUGA RANCH Valencia Sandario (SWTC) MAP KEY 29.5 kV Trico Trans Line 115 kV SWTC Trans Line 345 kV TEP SWTC Trans. ...

  15. Phase I --system scoping and feasibility studies

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    The National Energy Strategy (NES) calls for a balanced program of greater energy efficiency, use of alternative fuels, and the environmentally responsible development of all the U.S. energy resources. Consistent with the NES, a Department of Energy (DOE) program has been created to develop Advanced Turbine Systems (ATS). The objective of this 10-year program is to develop natural gas-fired base load power plants that will have cycle efficiencies greater than 60% (LHV), be environmentally superior to current technology, and also be cost competitive.

  16. San Carlos Apache Tribe Solar Feasibility Study

    Energy Savers [EERE]

    Department of Energy San Carlos Apache Tribe Set to Break Ground on New Solar Project San Carlos Apache Tribe Set to Break Ground on New Solar Project March 13, 2014 - 1:05pm Addthis The San Carlos Apache Tribe is making use of its extensive solar resources to power tribal facilities, including this 10-kilowatt (kW) solar PV system, which generates energy to run the tribal radio tower. Photo from San Carlos Apache Tribe, NREL 29202 The San Carlos Apache Tribe is making use of its extensive

  17. Fort Belknap Indian Community - Wind Feasibility Study

    Energy Savers [EERE]

    2006 Program Review 2006 Program Review October 25, 2006 October 25, 2006 FORT BELKNAP INDIAN COMMUNITY FORT BELKNAP INDIAN COMMUNITY History Location Project Overview Project Participates Objectives New Projects Relevant Background Information Project Status Future Plans FORT BELKNAP INDIAN COMMUNITY FORT BELKNAP INDIAN COMMUNITY Established in 1869, the Fort Belknap Reservation is the home to two distinct Northern Nations, the Gros Ventre and the Assiniboine tribes. The reservation is located

  18. Fort Mojave Tribe - Renewable Energy Feasibility Study

    Energy Savers [EERE]

    Development: Choices Choices Choices Renewable Energy Development: Choices Choices Choices Presented to: Tribal Energy Program Review October 2006 Presented by: Russell Gum PhD ERCC Analytics LLC Presented to: Tribal Energy Program Review October 2006 Presented by: Russell Gum PhD ERCC Analytics LLC Integrated Rural Energy Model Integrated Energy Model Sustainable Economy Solar Thermal Solar Thermal Module Drawing courtesy of Naanovo Solar Thermal E t h a n o l Ethanol Module Ethanol Production

  19. REMEDIAL INVESTIGATION, FEASIBILITY STUDY, & PROPOSED PLAN

    Office of Legacy Management (LM)

    This Appendix is not available in electronic format. Contact Wendee Ryan to request a copy.

  20. Keystone feasibility study. Final report. Vol. 4

    SciTech Connect (OSTI)

    Not Available

    1982-12-01

    Volume four of the Keystone coal-to-methanol project includes the following: (1) project management; (2) economic and financial analyses; (3) market analysis; (4) process licensing and agreements; and (5) appendices. 24 figures, 27 tables.

  1. Port Graham Village - Biomass Feasibility Study

    Energy Savers [EERE]

    ... Total Village Energy Load *Assumes energy required to heat community buildings ... Electrical Power Required, kW Electricity Usage, MWhyr Annual Electricity Cost Residential ...

  2. Port Graham Village - Biomass Feasibility Study

    Office of Environmental Management (EM)

    ... temperature for thermal mark on smolt Port Graham Energy Requirements-Electrical Usage * Estimated 2,000 MWh annual and 250 kW peak demand electrical use * Four existing ...

  3. SYNCHEM feasibility report: Phase 1

    SciTech Connect (OSTI)

    Not Available

    1995-01-01

    Several Czech and US companies have entered into a development agreement for the purposes of determining the technical and economic feasibility and overall financeability of an integrated gasification combined cycle (IGCC) regional energy facility to be located adjacent to the Chemopetrol refinery in Litvinov, Czech Republic. The Project would use a feedstock comprised of coal supplied by Doly a upravny Komorany s.p. (DUK) coal mining company and mined from the Most/Litvinov area together with high sulfur residual oils from the Chemopetrol refinery. When gasified together with oxygen from an Air Products air separation plant, and based on an average yearly consumption of 2,100K metric tons per year of coal (as delivered) and 630K tonnes per year of oil, approximately 11 million normal cubic meters per day of syngas will be produced. At its current projected design capacity, when combusted in two General Electric advanced technology Frame 9FA gas turbines, the Project will produce approximately 690MW of electric power; 250 metric tons/hour of steam for process; and 135 thermal equivalent MW of district heat. The Feasibility Phase efforts described in this report indicate the real possibility for a successful and profitable IGCC Project for the Czech Republic. It is therefore incumbent upon all the Project Participants to review and evaluate the information contained herein such that a go/no-go decision can be reached by early next year.

  4. Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Roberts, J. O.; Mosey, G.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

  5. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    SciTech Connect (OSTI)

    Curtis Miller

    2009-03-22

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  6. Feasibility Analysis For Heating Tribal Buildings with Biomass

    SciTech Connect (OSTI)

    Steve Clairmont; Micky Bourdon; Tom Roche; Colene Frye

    2009-03-03

    This report provides a feasibility study for the heating of Tribal buildings using woody biomass. The study was conducted for the Confederated Salish and Kootenai Tribes of the Flathead Reservation in western Montana. S&K Holding Company and TP Roche Company completed the study and worked together to provide the final report. This project was funded by the DOE's Tribal Energy Program.

  7. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Ft. Hood Military Base Outside Killeen, Texas. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Geiger, J.; Lisell, L.; Mosey, G.

    2013-10-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative through the Region 6 contract, selected Ft. Hood Army Base in Killeen, Texas, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for possible photovoltaic (PV) system installations and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  8. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Price Landfill Site in Pleasantville, New Jersey. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Price Landfill site in Pleasantville, New Jersey, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

  9. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Tower Road Site in Aurora, Colorado. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Van Geet, O.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Tower Road site in Aurora, Colorado, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

  10. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Chicago, Milwaukee, and St. Paul Rail Yard Company Site in Perry, Iowa. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Salasovich, J.; Geiger, J.; Healey, V.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chicago, Milwaukee & St. Paul Rail Yard Company site in Perry, Iowa, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at the site.

  11. Feasibility Study of Economics and Performance of Solar Photovoltaics at the TechCity East Campus Resource Conservation and Recovery Act Site in Kingston, New York. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Salasovich, J.; Geiger, J. W.; Mosey, G.; Healey, V.

    2014-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the TechCity East Campus site in Kingston, New York, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  12. INDEPENDENT TECHNICAL REVIEW OF THE FOCUSED FEASIBILITY STUDY AND PROPOSED PLAN FOR DESIGNATED SOLID WASTE MANAGEMENT UNITS CONTRIBUTING TO THE SOUTHWEST GROUNDWATER PLUME AT THE PADUCAH GASEOUS DIFFUSION PLANT

    SciTech Connect (OSTI)

    Looney, B.; Eddy-Dilek, C.; Amidon, M.; Rossabi, J.; Stewart, L.

    2011-05-31

    The U. S. Department of Energy (DOE) is currently developing a Proposed Plan (PP) for remediation of designated sources of chlorinated solvents that contribute contamination to the Southwest (SW) Groundwater Plume at the Paducah Gaseous Diffusion Plant (PGDP), in Paducah, KY. The principal contaminants in the SW Plume are trichloroethene (TCE) and other volatile organic compounds (VOCs); these industrial solvents were used and disposed in various facilities and locations at PGDP. In the SW plume area, residual TCE sources are primarily in the fine-grained sediments of the Upper Continental Recharge System (UCRS), a partially saturated zone that delivers contaminants downward into the coarse-grained Regional Gravel Aquifer (RGA). The RGA serves as the significant lateral groundwater transport pathway for the plume. In the SW Plume area, the four main contributing TCE source units are: (1) Solid Waste Management Unit (SWMU) 1 / Oil Landfarm; (2) C-720 Building TCE Northeast Spill Site (SWMU 211A); (3) C-720 Building TCE Southeast Spill Site (SWMU 211B); and (4) C-747 Contaminated Burial Yard (SWMU 4). The PP presents the Preferred Alternatives for remediation of VOCs in the UCRS at the Oil Landfarm and the C-720 Building spill sites. The basis for the PP is documented in a Focused Feasibility Study (FFS) (DOE, 2011) and a Site Investigation Report (SI) (DOE, 2007). The SW plume is currently within the boundaries of PGDP (i.e., does not extend off-site). Nonetheless, reasonable mitigation of the multiple contaminant sources contributing to the SW plume is one of the necessary components identified in the PGDP End State Vision (DOE, 2005). Because of the importance of the proposed actions DOE assembled an Independent Technical Review (ITR) team to provide input and assistance in finalizing the PP.

  13. Feasibility Study of Economics and Performance of Solar Photovoltaics at the VAG Mine Site in Eden and Lowell, Vermont. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Simon, J.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Vermont Asbestos Group (VAG) Mine site in Eden, Vermont, and Lowell, Vermont, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  14. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Brisbane Baylands Brownfield Site in Brisbane, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Salasovich, J.; Geiger, J.; Healey, V.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Brisbane Baylands site in Brisbane, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  15. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Kerr McGee Site in Columbus, Mississippi. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Simon, J.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Kerr McGee site in Columbus, Mississippi, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  16. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Snohomish County Cathcart Landfill Site in Snohomish County, Washington. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Olis, D.; Salasovich, J.; Mosey, G.; Healey, V.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Snohomish County Cathcart Landfill Site in Snohomish County, Washington, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  17. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Bethlehem Steel Plant Brownfield Site in Lackawanna, New York. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Bethlehem Steel Plant site in Lackawanna, New York, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  18. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Sky Park Landfill Site in Eau Claire, Wisconsin. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Simon, J.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Sky Park Landfill site in Eau Claire, Wisconsin, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  19. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Tronox Facility in Savannah, Georgia. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Kiatreungwattana, K.; Geiger, J.; Healey, V.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Tronox Facility site in Savannah, Georgia, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  20. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Former Fort Ord Army Base Site in Marina, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Stoltenberg, B.; Konz, C.; Mosey, G.

    2013-05-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Fort Ord Army Base (FOAB) site in Marina, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  1. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Peru Mill Industrial Park in the City of Deming, New Mexico. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Kiatreungwattana, K.; Geiger, J.; Healey, V.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Peru Mill Industrial Park site in the City of Deming, New Mexico, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  2. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Standard Chlorine of Delaware Superfund Site in Delaware City, Delaware. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-06-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Standard Chlorine of Delaware site in Delaware City, Delaware, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  3. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Kolthoff Landfill in Cleveland, Ohio. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Salasovich, J.; Geiger, J.; Mosey, G.; Healey, V.

    2013-06-01

    The U.S. Environmental Protection Agency (EPA), Region 5, in accordance with the RE-Powering America's Land initiative, selected the Kolthoff Landfill site in Cleveland, Ohio, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  4. Feasibility Study of Economics and Performance of Geothermal Power Generation at the Lakeview Uranium Mill Site in Lakeview, Oregon. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Hillesheim, M.; Mosey, G.

    2013-11-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Lakeview Uranium Mill site in Lakeview, Oregon, for a feasibility study of renewable energy production. The EPA contracted with the National Renewable Energy Laboratory (NREL) to provide technical assistance for the project. The purpose of this report is to describe an assessment of the site for possible development of a geothermal power generation facility and to estimate the cost, performance, and site impacts for the facility. In addition, the report recommends development pathways that could assist in the implementation of a geothermal power system at the site.

  5. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Crazy Horse Landfill Site in Salinas, California. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Stoltenberg, B.; Konz, C.; Mosey, G.

    2013-03-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Crazy Horse Landfill site in Salinas, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, operation and maintenance requirements, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  6. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Chino Mine in Silver City, New Mexico. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Kiatreungwattana, K.; Geiger, J.; Healey, V.; Mosey, G.

    2013-04-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Chino Mine site in Silver City, New Mexico, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.

  7. Process feasibility of DME to olefin conversion

    SciTech Connect (OSTI)

    Tartamella, T.L.; Fullerton, K.L.; Lee, S.; Kulik, C.J.

    1994-12-31

    The production of hydrocarbons via a synthetic route has been extensively studied by Mobil through its methanol based Methanol-to-Gasoline (MTG) process. An alternative approach using dimethyl ether (DME) has been developed by the University of Akron -- UA/EPRI DME-to-Hydrocarbons Process. The process feasibility of the production of hydrocarbons from DME has been illustrated in a bench scale, fluidized bed reactor using ZSM-5 type catalyst. In an effort to satisfy the growing demand for olefins as an intermediate chemical feedstocks a mechanistic/kinetic study was developed. The synthesis of olefins has been studied in packed bed micro-reactor using ZSM-5 catalyst. Experimental work has given details of reaction kinetics and mechanism in the conversion of DME to olefins. DME concentration weight hourly space velocity (WHSV), as well as reactor temperature and pressure were investigated in the study. This work was used as a precursor to the production of olefins/hydrocarbons from DME in a fluidized bed reactor. Product gas analysis was performed using an external GC standard method.

  8. Feasibility of an appliance energy testing and labeling program for Sri Lanka

    SciTech Connect (OSTI)

    Biermayer, Peter; Busch, John; Hakim, Sajid; Turiel, Issac; du Pont, Peter; Stone, Chris

    2000-04-01

    A feasibility study evaluated the costs and benefits of establishing a program for testing, labeling and setting minimum efficiency standards for appliances and lighting in Sri Lanka. The feasibility study included: refrigerators, air-conditioners, flourescent lighting (ballasts & CFls), ceiling fans, motors, and televisions.

  9. Feasibility Study of Economics and Performance of Solar Photovoltaics at the Vincent Mullins Landfill in Tucson, Arizona. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Steen, M.; Lisell, L.; Mosey, G.

    2013-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Vincent Mullins Landfill in Tucson, Arizona, for a feasibility study of renewable energy production. Under the RE-Powering America's Land initiative, the EPA provided funding to the National Renewable Energy Laboratory (NREL) to support the study. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this report is to assess the site for a possible PV installation and estimate the cost and performance of different PV configurations, as well as to recommend financing options that could assist in the implementation of a PV system. In addition to the Vincent Mullins site, four similar landfills in Tucson are included as part of this study.

  10. Renewable Energy Park - Preliminary Feasibility & Engineering Report

    SciTech Connect (OSTI)

    Ariwite, Roderick

    2015-07-31

    This "Renewable Energy Park - Preliminary Feasibility & Engineering Report" seeks to provide an overall assessment and review of renewable energy development opportunities on the Fallon Indian Reservation and Colony Lands.

  11. Report on the Feasibility of Pu Photoelectron Spectroscopy with...

    Office of Scientific and Technical Information (OSTI)

    Report on the Feasibility of Pu Photoelectron Spectroscopy with Microscopic and Nanoscopic Samples at NSLSII Citation Details In-Document Search Title: Report on the Feasibility of ...

  12. Hydrogen Fueling Station in Honolulu, Hawaii Feasibility Analysis

    Broader source: Energy.gov [DOE]

    This feasibility report assesses the technical and economic feasibility of deploying a hydrogen fueling station at the Fort Armstrong site in Honolulu.

  13. CX-009585: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Feasibility Study and Design of "Brightfield" Solar Farm CX(s) Applied: A9, B5.16 Date: 12/12/2012 Location(s): Pennsylvania Offices(s): Golden Field Office

  14. Using 3D Acoustic Telemetry to Assess the Response of Resident Salmonids to Strobe Lights in Lake Roosevelt, Washington; Chief Joseph Kokanee Enhancement Feasibility Study, Annual Report 2001-2002.

    SciTech Connect (OSTI)

    Perry, Russlee; Farley, M.; Hansen, Gabriel

    2003-01-01

    In 1995, the Chief Joseph Kokanee Enhancement Project was established to mitigate the loss of anadromous fish due to the construction of Chief Joseph and Grand Coulee dams. The objectives of the Chief Joseph Enhancement Project are to determine the status of resident kokanee (Oncorhynchus nerka) populations above Chief Joseph and Grand Coulee dams and to enhance kokanee and rainbow trout (Oncorhynchus mykiss) populations. Studies conducted at Grand Coulee Dam documented substantial entrainment of kokanee through turbines at the third powerhouse. In response to finding high entrainment at Grand Coulee Dam, the Independent Scientific Review Panel (ISRP) recommended investigating the use of strobe lights to repel fish from the forebay of the third powerhouse. Therefore, our study focused on the third powerhouse and how strobe lights affected fish behavior in this area. The primary objective of our study was to assess the behavioral response of kokanee and rainbow trout to strobe lights using 3D acoustic telemetry, which yields explicit spatial locations of fish in three dimensions. Our secondary objectives were to (1) use a 3D acoustic system to mobile track tagged fish in the forebay and upriver of Grand Coulee Dam and (2) determine the feasibility of detecting fish using a hydrophone mounted in the tailrace of the third powerhouse. Within the fixed hydrophone array located in the third powerhouse cul-de-sac, we detected 50 kokanee and 30 rainbow trout, accounting for 47% and 45% respectively, of the fish released. Kokanee had a median residence time of 0.20 h and rainbow trout had a median residence time of 1.07 h. We detected more kokanee in the array at night compared to the day, and we detected more rainbow trout during the day compared to the night. In general, kokanee and rainbow trout approached along the eastern shore and the relative frequency of kokanee and rainbow trout detections was highest along the eastern shoreline of the 3D array. However, because we released fish near the eastern shore, this approach pattern may have resulted from our release location. A high percentage of rainbow trout (60%) approached within 35 m of the eastern shore, while fewer kokanee (40%) approached within 35 m of the eastern shore and were more evenly distributed across the entrance to the third powerhouse cul-de-sac area. During each of the strobe light treatments there were very few fish detected within 25 m of the strobe lights. The spatial distribution of fish detections showed relatively few tagged fish swam through the center of the array where the strobe lights were located. We detected 11 kokanee and 12 rainbow trout within 25 m of the strobe lights, accounting for 10% and 18% respectively, of the fish released. Both species exhibited very short residence times within 25 m of the strobe lights No attraction or repulsion behavior was observed within 25 m of the strobe lights. Directional vectors of both kokanee and rainbow trout indicate that both species passed the strobe lights by moving in a downstream direction and slightly towards the third powerhouse. We statistically analyzed fish behavior during treatments using a randomization to compare the mean distance fish were detected from the strobe lights. We compared treatments separately for day and night and with the data constrained to three distances from the strobe light (< 85m, < 50 m, and < 25 m). For kokanee, the only significant randomization test (of 10 tests) occurred with kokanee during the day for the 3-On treatment constrained to within 85 m of the strobe lights, where kokanee were significantly further away from the strobe lights than during the Off treatment (randomization test, P < 0.004, Table 1.5). However, one other test had a low P-value (P = 0.064) where kokanee were closer to the lights during the 3-On treatment at night within 85 m of the strobe lights compared to the Off treatment. For rainbow trout, none of the 11 tests were significant, but one test had a low P-value (P = 0.04), and fish were further away from the strobe lights during

  15. {sup 18}F-Choline Positron Emission Tomography/Computed Tomography–Driven High-Dose Salvage Radiation Therapy in Patients With Biochemical Progression After Radical Prostatectomy: Feasibility Study in 60 Patients

    SciTech Connect (OSTI)

    D'Angelillo, Rolando M.; Sciuto, Rosa; Ramella, Sara; Papalia, Rocco; Jereczek-Fossa, Barbara A.; Trodella, Luca E.; Fiore, Michele; Gallucci, Michele; Maini, Carlo L.; Trodella, Lucio

    2014-10-01

    Purpose: To retrospectively review data of a cohort of patients with biochemical progression after radical prostatectomy, treated according to a uniform institutional treatment policy, to evaluate toxicity and feasibility of high-dose salvage radiation therapy (80 Gy). Methods and Materials: Data on 60 patients with biochemical progression after radical prostatectomy between January 2009 and September 2011 were reviewed. The median value of prostate-specific antigen before radiation therapy was 0.9 ng/mL. All patients at time of diagnosis of biochemical recurrence underwent dynamic {sup 18}F-choline positron emission tomography/computed tomography (PET/CT), which revealed in all cases a local recurrence. High-dose salvage radiation therapy was delivered up to total dose of 80 Gy to 18F-choline PET/CT-positive area. Toxicity was recorded according to the Common Terminology Criteria for Adverse Events, version 3.0, scale. Results: Treatment was generally well tolerated: 54 patients (90%) completed salvage radiation therapy without any interruption. Gastrointestinal grade ≥2 acute toxicity was recorded in 6 patients (10%), whereas no patient experienced a grade ≥2 genitourinary toxicity. No grade 4 acute toxicity events were recorded. Only 1 patient (1.7%) experienced a grade 2 gastrointestinal late toxicity. With a mean follow-up of 31.2 months, 46 of 60 patients (76.6%) were free of recurrence. The 3-year biochemical progression-free survival rate was 72.5%. Conclusions: At early follow-up, {sup 18}F-choline PET/CT-driven high-dose salvage radiation therapy seems to be feasible and well tolerated, with a low rate of toxicity.

  16. Technological Feasibility and Cost Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis » Analysis Methodologies » Technological Feasibility and Cost Analysis Technological Feasibility and Cost Analysis Technology Feasibility and Cost Analysis is performed to determine the potential economic viability of a process or technology, and helps to identify which technologies have the greatest likelihood of economic success. Results from technology feasibility analysis efforts provide input to balanced portfolio development and technology validation plans. The economic

  17. July 31 Webinar to Provide Guidance on Transmission Feasibility and System

    Energy Savers [EERE]

    Impact Studies | Department of Energy July 31 Webinar to Provide Guidance on Transmission Feasibility and System Impact Studies July 31 Webinar to Provide Guidance on Transmission Feasibility and System Impact Studies July 24, 2013 - 10:32am Addthis The U.S. Department of Energy (DOE) Office of Indian Energy, the DOE Office of Energy Efficiency and Renewable Energy's Tribal Energy Program, and the Western Area Power Administration (WAPA) will present the next Tribal Renewable Energy Series

  18. Aleutian Pribilof Islands Wind Feasibility and Energy Weatherization and Training

    Energy Savers [EERE]

    Aleutian Pribilof Islands Wind Feasibility and Energy Weatherization and Training Bruce Wright APIA Senior Scientist 2005 Wind Feasibility Studies: False Pass, Nikolski Sand Point, St. George, and Current Wind Energy Development Status Communities KwH Cost KwH (1,000,000) Diesel Demand (1,000 gals) KwHs Per Gallon King Cove 0.26 3.79 162 23 Akutan 0.32 0.52 44 12 Unalaska 0.36 34.48 2,194 16 False Pass 0.42 N/A N/A N/A St. Paul 0.46 4.59 389 12 Sand Point 0.52 4.03 317 13 AVERAGE 0.53 2.21 177

  19. HOOPER BAY HOUSING ANALYSIS AND ENERGY FEASIBILITY REPORT

    SciTech Connect (OSTI)

    SEA LION CORPORATION; COLD CLIMATE HOUSING RESEARCH CENTER; SOLUTIONS FOR HEALTHY BREATHING; WHITNEY CONSTRUCTION

    2012-12-30

    Sea Lion applied for and received a grant from the Department of Energy (DOE) towards this end titled “Energy Efficiency Development and Deployment in Indian Country”. The initial objectives of the Hooper Bay Energy Efficiency Feasibility Study were to demonstrate a 30% reduction in residential/commercial energy usage and identify the economic benefits of implementing energy efficiency measures to the Tribe through: (1) partnering with Whitney Construction and Solutions for Healthy Breathing in the training and hire of 2 local energy assessors to conduct energy audits of 9 representative housing models and 2 commercial units in the community. These homes are representative of 52 homes constructed across different eras. (2) partnering with Cold Climate Housing Research Center to document current electrical and heating energy consumption and analyze data for a final feasibility report (3) assessing the economics of electricity & heating fuel usage; (4) projecting energy savings or fossil fuel reduction by modeling of improvement scenarios and cost feasibility The following two objectives will be completed after the publication of this report: (5) the development of materials lists for energy efficiency improvements (6) identifying financing options for the follow-up energy efficiency implementation phase.

  20. 1980 Base case and feasibility analysis

    SciTech Connect (OSTI)

    1993-03-01

    This report describes a task of documenting a ``base case`` and performing a feasibility analysis for a national residential energy efficiency program for new homes, The principal objective of the task wasto estimate the energy consumption of typical homes built in 1980 and then to identify and assess the feasibility of methods to reduce that consumption by 50%. The goal of the program by the year 2000 is to reduce heating and cooling energy use in new homes built under the program to one-half of the energy use in typical new homes built in 1980. The task also calls for determining whether the program goal should be revised, based on the analysis.

  1. 1980 Base case and feasibility analysis

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This report describes a task of documenting a base case'' and performing a feasibility analysis for a national residential energy efficiency program for new homes, The principal objective of the task wasto estimate the energy consumption of typical homes built in 1980 and then to identify and assess the feasibility of methods to reduce that consumption by 50%. The goal of the program by the year 2000 is to reduce heating and cooling energy use in new homes built under the program to one-half of the energy use in typical new homes built in 1980. The task also calls for determining whether the program goal should be revised, based on the analysis.

  2. Lower Sioux Wind Feasibility and Development

    Energy Savers [EERE]

    Lower Sioux Wind Feasibility and Development DOE Tribal Energy Program Review November 2009 Lower Sioux Indian Community * 930-member community located on the southern bank of the Minnesota River in South Central Minnesota * Part of the Mdewakanton Band of Dakota; organized under the 1934 Indian Reorganization Act * Half of the population lives on the 1743-acre reservation * Five-member Lower Sioux Community Council Lower Sioux Enterprises * Jackpot Junction Casino * Lower Sioux Lodge * Dacotah

  3. SU-E-J-70: Feasibility Study of Dynamic Arc and IMRT Treatment Plans Utilizing Vero Treatment Unit and IPlan Planning Computer for SRS/FSRT Brain Cancer Patients

    SciTech Connect (OSTI)

    Huh, S; Lee, S; Dagan, R; Malyapa, R; Mendenhall, N; Mendenhall, W; Ho, M; Hough, D; Yam, M; Li, Z

    2014-06-01

    Purpose: To investigate the feasibility of utilizing Dynamic Arc (DA) and IMRT with 5mm MLC leaf of VERO treatment unit for SRS/FSRT brain cancer patients with non-invasive stereotactic treatments. The DA and IMRT plans using the VERO unit (BrainLab Inc, USA) are compared with cone-based planning and proton plans to evaluate their dosimetric advantages. Methods: The Vero treatment has unique features like no rotational or translational movements of the table during treatments, Dynamic Arc/IMRT, tracking of IR markers, limitation of Ring rotation. Accuracies of the image fusions using CBCT, orthogonal x-rays, and CT are evaluated less than ∼ 0.7mm with a custom-made target phantom with 18 hidden targets. 1mm margin is given to GTV to determine PTV for planning constraints considering all the uncertainties of planning computer and mechanical uncertainties of the treatment unit. Also, double-scattering proton plans with 6F to 9F beams and typical clinical parameters, multiple isocenter plans with 6 to 21 isocenters, and DA/IMRT plans are evaluated to investigate the dosimetric advantages of the DA/IMRT for complex shape of targets. Results: 3 Groups of the patients are divided: (1) Group A (complex target shape), CI's are same for IMRT, and DGI of the proton plan are better by 9.5% than that of the IMRT, (2) Group B, CI of the DA plans (1.91+/−0.4) are better than cone-based plan, while DGI of the DA plan is 4.60+/−1.1 is better than cone-based plan (5.32+/−1.4), (3) Group C (small spherical targets), CI of the DA and cone-based plans are almost the same. Conclusion: For small spherical targets, cone-based plans are superior to other 2 plans: DS proton and DA plans. For complex or irregular plans, dynamic and IMRT plans are comparable to cone-based and proton plans for complex targets.

  4. Oak Ridge Health Studies Phase 1 report, Volume 2: Part A, Dose Reconstruction Feasibility Study. Tasks 1 and 2, A summary of historical activities on the Oak Ridge Reservation with emphasis on information concerning off-site emissions of hazardous materials

    SciTech Connect (OSTI)

    Bruce, G.M.; Buddenbaum, J.E.; Lamb, J.K.; Widner, T.E.

    1993-09-01

    The Phase I feasibility study has focused on determining the availability of information for estimating exposures of the public to chemicals and radionuclides released as a result of historical operation of the facilities at the Oak Ridge Reservation (ORR). The estimation of such past exposures is frequently called dose reconstruction. The initial project tasks, Tasks 1 and 2 were designed to identify and collect information that documents the history of activities at the ORR that resulted in the release of contamination and to characterize the availability of data that could be used to estimate the magnitude of the contaminant releases or public exposures. A history of operations that are likely to have generated off-site releases has been documented as a result of Task 1 activities. The activities required to perform this task involved the extensive review of historical operation records and interviews with present and past employees as well as other knowledgeable individuals. The investigation process is documented in this report. The Task 1 investigations have led to the documentation of an overview of the activities that have taken place at each of the major complexes, including routine operations, waste management practices, special projects, and accidents and incidents. Historical activities that appear to warrant the highest priority in any further investigations were identified based on their likely association with off-site emissions of hazardous materials as indicated by the documentation reviewed or information obtained in interviews.

  5. Technical feasibility of the Diamex process

    SciTech Connect (OSTI)

    Sorel, C.; Montuir, M.; Espinoux, D.; Lorrain, B.; Baron, P.

    2008-07-01

    The DIAMEX process was developed at the CEA as the first of the two-step strategy to separate trivalent actinides from trivalent lanthanides. It consists of co-extracting trivalent actinides and lanthanides using a diamide extractant, dimethyl-dioctyl-hexyl-ethoxy-malonamide (DMDOHEMA). To demonstrate the technical feasibility of this process, a test has been successfully carried out with a PUREX raffinate solution in pulsed columns and mixer settlers, which are representative of the solvent-extraction contactors that could be used at the industrial scale. At the end of the trial, the americium and curium recovery yield exceeded 99.9% with high decontamination factors. (authors)

  6. Pre-Feasibility Analysis of Pellet Manufacturing on the Former Loring Air Force Base Site. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Hunsberger, R.; Mosey, G.

    2014-04-01

    The U.S. Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response, in accordance with the RE-Powering America's Lands initiative, engaged the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to conduct feasibility studies to assess the viability of developing renewable energy generating facilities on contaminated sites. This site, in Limestone, Maine -- formerly the location of the Loring Air Force Base but now owned by the Aroostook Band of Micmac -- was selected for the potential to produce heating pellets from woody feedstock. Biomass was chosen as the renewable energy resource to evaluate based on abundant woody-biomass resources available in the area. NREL also evaluates potential savings from converting existing Micmac property from oil-fired heating to pellet heating.

  7. Multi-institutional Feasibility Study of a Fast Patient Localization Method in Total Marrow Irradiation With Helical Tomotherapy: A Global Health Initiative by the International Consortium of Total Marrow Irradiation

    SciTech Connect (OSTI)

    Takahashi, Yutaka; Vagge, Stefano; Agostinelli, Stefano; Han, Eunyoung; Matulewicz, Lukasz; Schubert, Kai; Chityala, Ravishankar; Ratanatharathorn, Vaneerat; Tournel, Koen; Penagaricano, Jose A.; Florian, Sterzing; Mahe, Marc-Andre; Verneris, Michael R.; Weisdorf, Daniel J.; and others

    2015-01-01

    Purpose: To develop, characterize, and implement a fast patient localization method for total marrow irradiation. Methods and Materials: Topographic images were acquired using megavoltage computed tomography (MVCT) detector data by delivering static orthogonal beams while the couch traversed through the gantry. Geometric and detector response corrections were performed to generate a megavoltage topogram (MVtopo). We also generated kilovoltage topograms (kVtopo) from the projection data of 3-dimensional CT images to reproduce the same geometry as helical tomotherapy. The MVtopo imaging dose and the optimal image acquisition parameters were investigated. A multi-institutional phantom study was performed to verify the image registration uncertainty. Forty-five MVtopo images were acquired and analyzed with in-house image registration software. Results: The smallest jaw size (front and backup jaws of 0) provided the best image contrast and longitudinal resolution. Couch velocity did not affect the image quality or geometric accuracy. The MVtopo dose was less than the MVCT dose. The image registration uncertainty from the multi-institutional study was within 2.8 mm. In patient localization, the differences in calculated couch shift between the registration with MVtopo-kVtopo and MVCT-kVCT images in lateral, cranial–caudal, and vertical directions were 2.2 ± 1.7 mm, 2.6 ± 1.4 mm, and 2.7 ± 1.1 mm, respectively. The imaging time in MVtopo acquisition at the couch speed of 3 cm/s was <1 minute, compared with ≥15 minutes in MVCT for all patients. Conclusion: Whole-body MVtopo imaging could be an effective alternative to time-consuming MVCT for total marrow irradiation patient localization.

  8. FEASIBILITY OF RECYCLING PLUTONIUM AND MINOR ACTINIDES IN LIGHT WATER

    Office of Scientific and Technical Information (OSTI)

    REACTORS USING HYDRIDE FUEL (Technical Report) | SciTech Connect FEASIBILITY OF RECYCLING PLUTONIUM AND MINOR ACTINIDES IN LIGHT WATER REACTORS USING HYDRIDE FUEL Citation Details In-Document Search Title: FEASIBILITY OF RECYCLING PLUTONIUM AND MINOR ACTINIDES IN LIGHT WATER REACTORS USING HYDRIDE FUEL The objective of this DOE NERI program sponsored project was to assess the feasibility of improving the plutonium (Pu) and minor actinide (MA) recycling capabilities of pressurized water

  9. PRELIMINARY TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE INTEGRATION OF A PROCESS UTILIZING LOW-ENERGY SOLVENTS FOR CARBON DIOXIDE CAPTURE ENABLED BY A COMBINATION OF ENZYMES AND ULTRASONICS WITH A SUBCRITICAL PC POWER PLANT

    SciTech Connect (OSTI)

    Swaminathan, Saravanan; Kuczynska, Agnieszka; Hume, Scott; Mulgundmath, Vinay; Freeman, Charles; Bearden, Mark; Remias, Joe; Ambedkar, Balraj; Salmon, Sonja; House, Alan

    2012-11-01

    The results of the preliminary techno-economic assessment for integrating a process utilizing low-energy solvents for carbon dioxide (CO2) capture enabled by a combination of enzymes and ultrasonics with a subcritical pulverized coal (PC) power plant are presented. Four cases utilizing the enzyme-activated solvent are compared using different methodologies of regeneration against the DOE/NETL reference MEA case. The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as enzyme make-up rate and the capability of the ultrasonic regeneration process. The net efficiency of the integrated PC power plant with CO2 capture changes from 24.9% with the reference Case 10 plant to between 24.34% and 29.97% for the vacuum regeneration options considered, and to between 26.63% and 31.41% for the ultrasonic regeneration options. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variable being the initial estimation of enzyme dosing rate. The LCOE ($/MWh) values range from 112.92 to 125.23 for the vacuum regeneration options and from 108.9 to 117.50 for the ultrasonic regeneration cases considered in comparison to 119.6 for the reference Case 10. A sensitivity analysis of the effect of critical parameters on the LCOE was also performed. The results from the preliminary techno-economic assessment show that the proposed technology can be investigated further with a view to being a viable alternative to conventional CO2 scrubbing technologies.

  10. FEASIBILITY OF RECYCLING PLUTONIUM AND MINOR ACTINIDES IN LIGHT...

    Office of Scientific and Technical Information (OSTI)

    IN LIGHT WATER REACTORS USING HYDRIDE FUEL Citation Details In-Document Search Title: FEASIBILITY OF RECYCLING PLUTONIUM AND MINOR ACTINIDES IN LIGHT WATER REACTORS USING ...

  11. Feasibility of OnBoard Thermoelectric Generation for Improved...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Feasibility of OnBoard Thermoelectric Generation for Improved Vehicle Fuel Economy Poster presentation at the 2007 Diesel Engine-Efficiency & Emissions Research Conference (DEER ...

  12. Towards feasible and effective predictive wavefront control for...

    Office of Scientific and Technical Information (OSTI)

    predictive wavefront control for adaptive optics Citation Details In-Document Search Title: Towards feasible and effective predictive wavefront control for adaptive optics We ...

  13. Recovery Act: Demonstrating The Commercial Feasibility OfGeopressured...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lake Field, Cameron Parish, Louisiana Recovery Act: Demonstrating The Commercial Feasibility Of Geopressured-Geothermal Power Generation At Sweet Lake Field, Cameron Parish, ...

  14. Feasibility Assessment of the Water Energy Resources of the United...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydro Classes of Hydroelectric Plants: Main Report and Appendix A Feasibility Assessment of the Water Energy Resources of the United States for New Low Power and Small Hydro ...

  15. Feasibility of observing small differences in friction mean effective...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Feasibility of observing small differences in friction mean effective pressure between different lubricating oil formations using small, single-cylinder motored ...

  16. Technical Feasibility Assessment of LED Roadway Lighting on the...

    Office of Scientific and Technical Information (OSTI)

    Technical Feasibility Assessment of LED Roadway Lighting on the Golden Gate Bridge Tuenge, Jason R. LED; induction; ceramic metal halide; plasma; roadway lighting; Golden Gate...

  17. Feasibility of Tital and Ocean Current Energy in False Pass,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Monty Worthington Director of Project Development - Alaska Feasibility of Tidal and Ocean ... * ORPC Alaska and ORPC Solutions (Ocean Renewable Power Company) * The Aleutian ...

  18. HUD CHP GUIDE #2 - FEASIBILITY SCREENING FOR CHP IN MULTIFAMILY...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agency's preliminary screening exercise and shows the screens for the feasibility screening tool, computer software prepared for HUD by the Oak Ridge National Laboratory (ORNL). ...

  19. Hydrogen Fueling Station in Honolulu, Hawaii Feasibility Analysis...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    competitive prices-to fuel FCEVs. PDF icon Hydrogen Fueling Station in Honolulu, Hawaii Feasibility Analysis More Documents & Publications Hawaii Renewable Hydrogen Program ...

  20. Feasibility and testing of lighweight, energy efficient, additive...

    Office of Scientific and Technical Information (OSTI)

    pneumatic control valve Citation Details In-Document Search Title: Feasibility and testing of lighweight, energy efficient, additive manufactured pneumatic control valve ...

  1. Feasibility and testing of lighweight, energy efficient, additive...

    Office of Scientific and Technical Information (OSTI)

    pneumatic control valve Citation Details In-Document Search Title: Feasibility and testing of lighweight, energy efficient, additive manufactured pneumatic control valve You ...

  2. Feasibility Assessment of the Water Energy Resources of the United...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment of the Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants: Main Report and Appendix A Feasibility...

  3. Economic feasibility analysis of water-harvesting techniques for mined-land reclamation

    SciTech Connect (OSTI)

    Nieves, L.A.; Marti, M.H.

    1981-07-01

    A water harvesting, agricultural production system, field tested as a means of reclaiming strip-mined land is described. Though the technical feasibility of the system is becoming increasingly apparent, economic feasibility and legal issues may determine its potential application. The purpose of this study is to explore the economic feasibility of the system and to provide information for use in assessing whether further investigation of water harvesting reclamation techniques is warranted. The economic feasibility of the PNL reclamation system hinges on whether its net benefits exceed those of conventional reclamation. This preliminary feasibility study assesses the net private benefits of each system using data for the Peabody Coal Company's Kayenta mine on the Black Mesa in Arizona. To compare the alternative reclamation systems, the present value of direct net benefits (income minus production and reclamation costs) is calculated for grazing (conventional reclamation) or for cropping (PNL reclamation). Three of the PNL system slope treatments have lower estimated total costs than conventional reclamation. The difference is $3895/acre for compacted slope, $3025/acre for salt-compacted slope and $2310/acre for crop-on-slope. These differences constitute a substantial cost advantage for the system on the basis of the present value of land reclamation and maintenance costs. The system also has advantages based on the estimated value of agricultural production capacity. Even the lowest yield levels considered for alfalfa, corn, and pinto beans had higher net present values than grazing.

  4. Economic Feasibility of Recycling Photovoltaic Modules

    SciTech Connect (OSTI)

    Choi, J.K.; Fthenakis, V.

    2010-12-01

    The market for photovoltaic (PV) electricity generation has boomed over the last decade, and its expansion is expected to continue with the development of new technologies. Taking into consideration the usage of valuable resources and the generation of emissions in the life cycle of photovoltaic technologies dictates proactive planning for a sound PV recycling infrastructure to ensure its sustainability. PV is expected to be a 'green' technology, and properly planning for recycling will offer the opportunity to make it a 'double-green' technology - that is, enhancing life cycle environmental quality. In addition, economic feasibility and a sufficient level of value-added opportunity must be ensured, to stimulate a recycling industry. In this article, we survey mathematical models of the infrastructure of recycling processes of other products and identify the challenges for setting up an efficient one for PV. Then we present an operational model for an actual recycling process of a thin-film PV technology. We found that for the case examined with our model, some of the scenarios indicate profitable recycling, whereas in other scenarios it is unprofitable. Scenario SC4, which represents the most favorable scenario by considering the lower bounds of all costs and the upper bound of all revenues, produces a monthly profit of $107,000, whereas the least favorable scenario incurs a monthly loss of $151,000. Our intent is to extend the model as a foundation for developing a framework for building a generalized model for current-PV and future-PV technologies.

  5. Yavapai-Apache Nation - Forest Biomass Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... U.S. Department of Energy (DOE) Renewable Energy U.S. Department of Energy (DOE) Renewable ... power utilization assessment, technology assessment, power utilization assessment, ...

  6. Feasibility Study for the Formation of a Renewable Energy Tribal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Project Tasks Project Tasks Renewable Energy Resources and Technology Assessment Wind Biogas Biodiesel Solar Detailed Reservation Load Profile Assessment of Energy Storage and Load ...

  7. Kaw Nation of Oklahoma- The Kanza People Feasiblity Study

    Energy Savers [EERE]

    October 2004 October 2004 Golden, Colorado Golden, Colorado The Kanza People The Kanza People Kaws, Osages, Poncas, Omahas, Quapaws Kaws, Osages, Poncas, Omahas, Quapaws - - Dehegila Dehegila - - Siouan of Ohio Valley Siouan of Ohio Valley 2 October 2004 October 2004 Golden, Colorado Golden, Colorado DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Office of Energy Efficiency and Renewable Energy Office of Energy Efficiency and Renewable Energy Tribal Energy Program Tribal Energy Program Wind Wind - -

  8. Feasibility Study of Hydrogen Production at Existing Nuclear...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    project(s) that will utilize hydrogen production equipment and nuclear energy as necessary to produce data and analysis on the economics of hydrogen production with nuclear energy. ...

  9. Energy Efficiency in Separate Tenant Spaces - A Feasibility Study...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    While commercial building owners generally have control over building systems and operations, tenants play a critical role in achieving lasting reductions in energy intensity. In ...

  10. 200-CW-5 Proposed Plan & Feasibility Study, Draft B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Responding to survey: * Columbia Riverkeeper * Hanford Watch * Heart of America Northwest * Oregon Department of Energy * Washington Department of Ecology * WA Physicians for...

  11. Native Village of Eyak Wind Energy Feasibility Study: A Summary...

    Office of Environmental Management (EM)

    Turbulence issues Need to measure higher Land Ownership issues Silt (in air) very high winds, and icing may present difficulties No transmission lines past 14 mile. ...

  12. Feasibility study of broadband efficient ''water window'' source

    SciTech Connect (OSTI)

    Higashiguchi, Takeshi; Yugami, Noboru; Otsuka, Takamitsu; Jiang Weihua; Endo, Akira; Li Bowen; Dunne, Padraig; O'Sullivan, Gerry

    2012-01-02

    We demonstrate a table-top broadband emission water window source based on laser-produced high-Z plasmas. Resonance emission from multiply charged ions merges to produce intense unresolved transition arrays (UTAs) in the 2-4 nm region, extending below the carbon K edge (4.37 nm). Arrays resulting from n=4-n=4 transitions are overlaid with n=4-n=5 emission and shift to shorter wavelength with increasing atomic number. An outline of a microscope design for single-shot live cell imaging is proposed based on a bismuth plasma UTA source, coupled to multilayer mirror optics.

  13. Feasibility Study of MOX Fuel Online Burnup Analysis

    SciTech Connect (OSTI)

    Dennis, M.L.; Usman, S.

    2006-07-01

    This research is an extension of well established Non-Destructive Analysis of UO fuel using gamma spectroscopy of Cs-137 and other related isotopes. Given the performance similarities between UO fuel and MOX fuel, investigations are underway to develop similar correlation for MOX. MOX fuel burnup and decay simulations are being performed using ORIGEN-ARP (Oak Ridge Isotope Generation and Depletion Code - Automatic Rapid Processing). Simulation results are being analyzed and will be used to determine performance specifications of a detection system for field applications. Analysis of isotopic activity from irradiated fuel will be used to develop correlations to determine burn-up and Plutonium content of MOX fuel. These results will be particularly useful in view of the recent interest in MOX fuel. (authors)

  14. Marin Solar Village: feasibility study and technical analysis. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-08-31

    The energy needs of Hamilton Air Force Base's Solar Village for electricity and heating and cooling of buildings are considered and alternative ways of meeting the Village's requirements for these forms of energy are evaluated. First, Solar Village's energy demand is calculated and compared to a base case representing calculations for typical energy usage for a development of similar size and density that is in conformance with current state and local ordinances. The potential of selected alternative technologies to meet the Solar Village projected demand for electrical power and natural gas is evaluated. Scenarios were developed to reduce demand, particularly in the building sector. Four alternative on-site energy technologies have been evaluated: wind, solar thermal electric, biomass conversion, photovoltaics. Each alternative is analyzed in detail. Of the four alternatives considered, the one with the greatest present potential is biomass conversion. Two technologies have been incorporated into the design. A 3-acre land fill is covered with a mantle of soil. A network of pipes carries off the methane gas which is a natural product of anaerobic decomposition of the materials in the land fill. The second technology involves the planting of rapidly-growing trees on denuded and unused portions of the site; 50 acres devoted to tree production could yield 12% of the back-up energy required for home heating on a sustainable basis.

  15. Grand Traverse Band - Renewable Energy and Energy Efficiency Feasibility Study

    Energy Savers [EERE]

    as a Feedstock | Department of Energy Grand Opening for Project LIBERTY: Nation's First Plant to Use Corn Waste as a Feedstock Grand Opening for Project LIBERTY: Nation's First Plant to Use Corn Waste as a Feedstock August 28, 2014 - 12:33pm Addthis POET-DSM's Project LIBERTY in Emmetsburg, Iowa, will celebrate its grand opening September 3, 2014, becoming the first commercial-scale cellulosic ethanol plant to use corn waste as a feedstock. Developed through a joint venture between POET LLC

  16. Pinoleville Pomo Nation Renewable Energy Feasibility Study Final...

    Energy Savers [EERE]

    and tradition over the generations * Focus: - Create project that utilize renewable energy - Incorporate cultural and traditional values - Self sufficiency * Using ...

  17. Salish and Kootenai Tribes - Flathead Reservation Renewable Energy Feasibility Study

    Energy Savers [EERE]

    *6,500 enrolled members *3,700 living on the reservation *26,000 residents *26% Native American *Tribal members represent 56% of Native American population Flathead Reservation Location Flathead Reservation Location Tribal Council * 10 Tribal Council members * 7 Districts * 4 Year terms * Staggered elections (5 positions every 2 years) S & K Holding Company, Inc. * Created 1992 under Tribal Authority * Promote economic independence by maximizing economic opportunities for the Tribe and

  18. Smith River Rancheria - Wind and Biomass Power Generation Feasibility Study

    Energy Savers [EERE]

    DOE Tribal Energy Program Program Review Meeting October 17 - 21, 2005 Greg Retzlaff Strategic Energy Solutions, Inc. Wind & Biomass Power Generation Smith River Rancheria 2 Smith River Rancheria * Coastal Community of 600 * Members Living in Oregon * Next Door to Booming Community * Additional Development Opportunities Wind & Biomass Power Generation Smith River Rancheria 3 Location * Northern California Location * Members in Oregon * Multiple Jurisdictions - Federal - Del Norte County

  19. Solar/Wind Feasibility Study at Whitewater Ranch

    Energy Savers [EERE]

    and Energy Efficiency Justice Solar and Energy Efficiency Justice June 24, 2010 - 3:00pm Addthis The roof of the justice center where a solar panel array will be installed to power a solar thermal water-heating system | Photo courtesy of Blount County, Tenn. The roof of the justice center where a solar panel array will be installed to power a solar thermal water-heating system | Photo courtesy of Blount County, Tenn. A solar thermal water-heating system at the justice center in Maryville, Tenn.,

  20. Solar/Wind Feasibility Study at Whitewater Ranch

    Energy Savers [EERE]

    * Tribal ancestors resided in the area surrounding the San Jacinto Mountains in the Southern California region for centuries. * The Agua Caliente Reservation (approximately 32,000 acres) was deeded in trust by Federal Order in 1876 to the Agua Caliente Tribe. * The Tribe was deeded the even numbered sections as the odd numbered sections were deeded to Southern Pacific Railroad in 1860; Creating a checkerboard reservation configuration. * Portions of the cities of Palm Springs, Cathedral City

  1. Stockbridge-Munsee Community - Renewable Energy Feasibility Study

    Energy Savers [EERE]

    R. Thai About Us Steven R. Thai - Office of Public Affairs Steven R. Thai Steven joined the U.S. Department of Energy in April of 2012 as a Press Assistant in the Office of Public Affairs, supporting the Office of Electrical Delivery and Energy Reliability, ARPA-E, Office of Indian Energy, and DOE Support Offices in crisis and strategic communications he is also the Mentorship Coordinator for the DOE/New Directions Alternative Program (Arlington County Public Schools) Mentorship Partnership. He

  2. Confederated Salish and Kootenai Tribes Feasibility Study to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Tribal Health and Human Services Clinic in St. Ignatius, Montana Rooftop Heating Unit Siding Community & Fitness Center in St. Ignatius, MT Ronan Indian Senior Citizen Center ...

  3. Pascua Yaqui Tribe - Renewable Energy Development and Deployment Feasibility Study

    Energy Savers [EERE]

    Fuel Cells » Parts of a Fuel Cell Parts of a Fuel Cell Polymer electrolyte membrane (PEM) fuel cells are the current focus of research for fuel cell vehicle applications. PEM fuel cells are made from several layers of different materials. The main parts of a PEM fuel cell are described below. The heart of a PEM fuel cell is the membrane electrode assembly (MEA), which includes the membrane, the catalyst layers, and gas diffusion layers (GDLs). Hardware components used to incorporate an MEA into

  4. Pinoleville Pomo Nation Renewable Energy Feasibility Study Status

    Energy Savers [EERE]

    Status Deborah Smith Environmental Outreach Coordinator, Pinoleville Pomo Nation Ryan Shelby Program Manager, Community Assessment of Renewable Energy & Sustainability (CARES) 2011 U.S. Department of Energy Tribal Energy Program Review November 15, 2011 Pinoleville Pomo Nation * The Pinoleville Pomo Nation is a Native American tribe located in Mendocino County Mission Statement of the Pinoleville Pomo Nation * Secures tribal government, affirms and protects tribal sovereignty * Maintains

  5. Final Feasibility Study for the Madison Site , Madison Illinois...

    Office of Legacy Management (LM)

    EXECUTIVE SUMMARY The Madison site (former Dow Chemical Company facility) located at ... the site due to past operations by Dow Chemical Company (Dow) and Mallinckrodt Chemical ...

  6. City of Klamath Falls, Oregon Geothermal Power Plant Feasibility Study

    SciTech Connect (OSTI)

    Brian Brown, PE; Stephen Anderson, PE, Bety Riley

    2011-07-31

    The purpose of the Klamath Falls project is to demonstrate the effectiveness of a combined thermal distribution system and power generation facility. The city of Klamath Falls operates a geothermal district heating system which would appear to be an attractive opportunity to install a power generation system. Since the two wells have operated reliably and consistently over many years, no new sources or resource exploration would be necessary. It appears that it will cost more to construct, operate, maintain and amortize a proposed geothermal facility than the long?term value of the power it would produce. The success of a future project will be determined by whether utility power production costs will remain low and whether costs of construction, operations, or financing may be reduced. There are areas that it would be possible to reduce construction cost. More detailed design could enable the city to obtain more precise quotes for components and construction, resulting in reduction in contingency projections. The current level of the contingency for uncertainty of costs is between $200,000 and $300,000. Another key issue with this project appears to be operation cost. While it is expected that only minimal routine monitoring and operating expenses will occur, the cost of water supply and waste water disposal represents nearly one quarter of the value of the power. If the cost of water alone could be reduced, the project could become viable. In addition, the projected cost of insurance may be lower than estimated under a city?wide policy. No provisions have been made for utilization of federal tax incentives. If a transaction with a third-party owner/taxpayer were to be negotiated, perhaps the net cost of ownership could be reduced. It is recommended that these options be investigated to determine if the costs and benefits could be brought together. The project has good potential, but like many alternative energy projects today, they only work economically if the federal tax incentives come into play.

  7. Mini-Split Heat Pumps Multifamily Retrofit Feasibility Study

    SciTech Connect (OSTI)

    Dentz, Jordan; Podorson, David; Varshney, Kapil

    2014-05-01

    Mini-split heat pumps can provide space heating and cooling in many climates and are relatively affordable. These and other features make them potentially suitable for retrofitting into multifamily buildings in cold climates to replace electric resistance heating or other outmoded heating systems. This report investigates the suitability of mini-split heat pumps for multifamily retrofits. Various technical and regulatory barriers are discussed and modeling was performed to compare long-term costs of substituting mini-splits for a variety of other heating and cooling options. A number of utility programs have retrofit mini-splits in both single family and multifamily residences. Two such multifamily programs are discussed in detail.

  8. Feasibility Study for an Autonomous UAV -Magnetometer System...

    Office of Scientific and Technical Information (OSTI)

    ... HELICOPTERS; MAGNETOMETERS; METERS; MILITARY EQUIPMENT; POSITIONING; RESOLUTION; SEEDS; SITE CHARACTERIZATION; STORAGE UXO, Magnetometer, UAV Word Cloud More Like This Full ...

  9. Navajo Tribal Utility Authority - Wind Energy Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in the present states of Arizona, New Mexico and Utah * Reservation includes an area ... Service * Renewable Energy Sources o Photovoltaic power systems o Hybrid ...

  10. Feasibility Study for an Autonomous UAV -Magnetometer System...

    Office of Scientific and Technical Information (OSTI)

    which medium altitude fixed wing optical imaging is used for an initial site assessment. ... An UAV (Unmanned Aerial Vehicle) magnetometer platform is an obvious alternative. The ...

  11. Eastern Shoshone Tribe - Wind Feasibility Study on the Wind River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Project Locations Boysen Peak Site Sheldon Dome Site Big Horn Flats Site Tatanka Energy - ... Accomplishments Site Visits by Participants Joint Business Council approved Sheldon Dome ...

  12. Lower Sioux Indian Community Wind Energy Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... negatively effecting the quality of transmission. ... Boundary Turbines State Line Figure 2: Area of Interest ... given by the generic formula: where: rn is the radius ...

  13. Feasibility Study for Biomass Electrical Generation on Tribal...

    Office of Environmental Management (EM)

    ... - Sharply higher natural gas prices, supply ... Siting Criteria * Land - Acreage required ... gas, water, sewer, wastewater, uses for waste heat. * Transportation -Highway requirements ...

  14. Trestle Bay Restoration Project Draft Feasibility Study and Draft

    Broader source: Energy.gov (indexed) [DOE]

    Local Operating Procedures for Endangered Species to Administer Stream Restoration and Fish Passage Improvement Actions Authorized or Carried Out by the U.S. Army Corps of...

  15. Trestle Bay Restoration Project Final Feasibility Study and Environmen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Nesting begins in late March and continues into June and consists of a shallow depression built in the open or near a grass clump and lined with fine dead grasses. The streaked ...

  16. Eastern Shoshone Tribe - Wind Feasibility Study on the Wind River...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RMP line) Met Tower Locations Boysen Peak Crow Creek upper Big Horn Flats Stagner Mtn. ... Percentage of Time at Speed & Direction 5 . 1 4 . 7 3 . 9 4 . 1 4 . 9 4 . 7 3 . 7 3 . 6 3 ...

  17. HAB_Attachment_1_Feasibility_Study_highlights.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  18. Stockbridge-Munsee Community - Renewable Energy Feasibility Study

    Office of Environmental Management (EM)

    Status Status PDF icon Status More Documents & Publications DOE O 206.2 Identity, Credential, and Access Management (ICAM) ICAM Workshop Audit Report: IG-0860 Department of Energy

    Statutes, Regulations, and Directives for Classification Program Statutes, Regulations, and Directives for Classification Program Classification Atomic Energy Act of 1954 - Establishes Government-wide policies for classifying, safeguarding, and declassifying Restricted Data information. 10 CFR Part 1045,

  19. 1-2 MW Community Scale Solar Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Costs, benefits for Tribe Understanding solar power development Clean ... 4 Travel Center 4.8% 5 Farm & Ranch Enterprise 3.8% 6 Recreation Center 3.6% 7 Tribal ...

  20. USDA Offers Renewable Energy Feasibility Studies for Rural Businesses...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    by the 2008 Farm Bill, the program is only available to biorefineries that were in existence when the bill was enacted on June 18, 2008. Lincolnway Energy started making ethanol...

  1. Coeur d'Alene Tribe Energy Efficiency Feasibility Study

    Energy Savers [EERE]

    ... Center Annual Electric Usage 250000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 0 50000 100000 150000 200000 2009 2010 Prior Work: Tribal Wellness Center Energy Use Break ...

  2. Vehicle Technologies Office Merit Review 2014: Dynamic Feasibility Study

    Broader source: Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about a dynamic...

  3. FEASIBILITY OF WIND TO SERVE UPPER SKAGIT'S BOW HILL TRIBAL LANDS AND FEASIBILITY UPDATE FOR RESIDENTIAL RENEWABLE ENERGY.

    SciTech Connect (OSTI)

    RICH, LAUREN

    2013-09-30

    A two year wind resource assessment was conducted to determine the feasibility of developing a community scale wind generation system for the Upper Skagit Indian Tribe�s Bow Hill land base, and the project researched residential wind resource technologies to determine the feasibility of contributing renewable wind resource to the mix of energy options for our single and multi-family residential units.

  4. Feasibility assessment of copper-base waste package container materials in a tuff repository

    SciTech Connect (OSTI)

    Acton, C.F.; McCright, R.D.

    1986-09-30

    This report discussed progress made during the second year of a two-year study on the feasibility of using copper or a copper-base alloy as a container material for a waste package in a potential repository in tuff rock at the Yucca Mountain site in Nevada. Corrosion testing in potentially corrosive irradiated environments received emphasis during the feasibility study. Results of experiments to evaluate the effect of a radiation field on the uniform corrosion rate of the copper-base materials in repository-relevant aqueous environments are given as well as results of an electrochemical study of the copper-base materials in normal and concentrated J-13 water. Results of tests on the irradiation of J-13 water and on the subsequent formation of hydrogen peroxide are given. A theoretical study was initiated to predict the long-term corrosion behavior of copper in the repository. Tests were conducted to determine whether copper would adversely affect release rates of radionuclides to the environment because of degradation of the Zircaloy cladding. A manufacturing survey to determine the feasibility of producing copper containers utilizing existing equipment and processes was completed. The cost and availability of copper was also evaluated and predicted to the year 2000. Results of this feasibility assessment are summarized.

  5. Feasibility Study of Economics and Performance of Solar Photovoltaics at Massachusetts Military Reservation. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    SciTech Connect (OSTI)

    Stafford, B.; Robichaud, R.; Mosey, G.

    2011-07-01

    This report presents the results of an assessment of the technical and economic feasibility of deploying photovoltaics (PV) systems on a superfund site located within the Massachusetts Military Reservation (MMR). The site was assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzed using an electric rate of $0.17/kWh and incentives offered in the State of Massachusetts, such as the solar renewable energy credits. According to calculations, MMR can place 8 MW of ballast-weighted, ground-mounted PV systems on the crowns of the three landfill caps and the borrow pit with the PV modules tilted at 30 degrees.

  6. Feasibility of Tital and Ocean Current Energy in False Pass,...

    Energy Savers [EERE]

    Monty Worthington Director of Project Development - Alaska Feasibility of Tidal and Ocean Current Energy in False Pass, Aleutian Islands, Alaska (DE-EE0005624.000) Presented to DOE ...

  7. Wind Resource and Feasibility Assessment Report for the Lummi Reservation

    SciTech Connect (OSTI)

    DNV Renewables Inc.; J.C. Brennan & Associates, Inc.; Hamer Environmental L.P.

    2012-08-31

    This report summarizes the wind resource on the Lummi Indian Reservation (Washington State) and presents the methodology, assumptions, and final results of the wind energy development feasibility assessment, which included an assessment of biological impacts and noise impacts.

  8. Feasibility Assessment of the Water Energy Resources of the United...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ID-11263 January 2006 Feasibility Assessment of the Water Energy Resources of the United ... The term "available" as used to refer to water energy resource sites or a category of ...

  9. Lummi Indian Reservation Wind Energy Development Feasibility Assessment

    Energy Savers [EERE]

    Lummi Indian Reservation Wind Energy Development Feasibility Assessment Jeremy Freimund, Water Resources Manager Victor Johnson, GIS/Water Resources Tech. III Lummi Natural Resources Department U.S. Department of Energy Tribal Energy Program Review November 15, 2011 Purpose Statement l The purpose of this presentation is to: l Provide summary information about the Lummi Nation; l Describe the Lummi Indian Reservation Wind Energy Development Feasibility Assessment Project; and l Provide an update

  10. Lummi Indian Reservation Wind Energy Development Feasibility Assessment

    Energy Savers [EERE]

    Lummi Indian Reservation Wind Energy Development Feasibility Assessment Jeremy Freimund, P.H. Water Resources Manager Lummi Natural Resources Department U.S. Department of Energy Tribal Energy Program Review November 19, 2009 Purpose Statement  The purpose of this presentation is to:  Provide summary information about the Lummi Nation; and  Summarize the Lummi Indian Reservation Wind Energy Development Feasibility Assessment Project. Lummi Nation Overview Brief History - the Reservation

  11. Feasibility and testing of lighweight, energy efficient, additive

    Office of Scientific and Technical Information (OSTI)

    manufactured pneumatic control valve (Technical Report) | SciTech Connect Feasibility and testing of lighweight, energy efficient, additive manufactured pneumatic control valve Citation Details In-Document Search Title: Feasibility and testing of lighweight, energy efficient, additive manufactured pneumatic control valve AeroValve s innovative pneumatic valve technology recycles compressed air through the valve body with each cycle of the valve, and was reported to reduce compressed air

  12. Feasibility of observing small differences in friction mean effective

    Office of Scientific and Technical Information (OSTI)

    pressure between different lubricating oil formations using small, single-cylinder motored engine rig (Journal Article) | SciTech Connect Journal Article: Feasibility of observing small differences in friction mean effective pressure between different lubricating oil formations using small, single-cylinder motored engine rig Citation Details In-Document Search This content will become publicly available on September 1, 2016 Title: Feasibility of observing small differences in friction mean

  13. Technical feasibility of storage on large dish stirling systems. (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Technical Report: Technical feasibility of storage on large dish stirling systems. Citation Details In-Document Search Title: Technical feasibility of storage on large dish stirling systems. × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy

  14. The Majorana Demonstrator: Progress towards showing the feasibility of a

    Office of Scientific and Technical Information (OSTI)

    76Ge neutrinoless double-beta decay experiment (Conference) | SciTech Connect The Majorana Demonstrator: Progress towards showing the feasibility of a 76Ge neutrinoless double-beta decay experiment Citation Details In-Document Search Title: The Majorana Demonstrator: Progress towards showing the feasibility of a 76Ge neutrinoless double-beta decay experiment × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of

  15. Report on the Feasibility of Pu Photoelectron Spectroscopy with Microscopic

    Office of Scientific and Technical Information (OSTI)

    and Nanoscopic Samples at NSLSII (Technical Report) | SciTech Connect Report on the Feasibility of Pu Photoelectron Spectroscopy with Microscopic and Nanoscopic Samples at NSLSII Citation Details In-Document Search Title: Report on the Feasibility of Pu Photoelectron Spectroscopy with Microscopic and Nanoscopic Samples at NSLSII Authors: Tobin, J G Publication Date: 2012-09-11 OSTI Identifier: 1053685 Report Number(s): LLNL-TR-582213 DOE Contract Number: W-7405-ENG-48 Resource Type:

  16. Assessing the feasibility of volumetric-modulated arc therapy using

    Office of Scientific and Technical Information (OSTI)

    simultaneous integrated boost (SIB-VMAT): An analysis for complex head-neck, high-risk prostate and rectal cancer cases (Journal Article) | SciTech Connect Assessing the feasibility of volumetric-modulated arc therapy using simultaneous integrated boost (SIB-VMAT): An analysis for complex head-neck, high-risk prostate and rectal cancer cases Citation Details In-Document Search Title: Assessing the feasibility of volumetric-modulated arc therapy using simultaneous integrated boost (SIB-VMAT):

  17. Technical feasibility of storage on large dish stirling systems. (Technical

    Office of Scientific and Technical Information (OSTI)

    Report) | SciTech Connect Technical Report: Technical feasibility of storage on large dish stirling systems. Citation Details In-Document Search Title: Technical feasibility of storage on large dish stirling systems. Authors: Andraka, Charles E. ; Rawlinson, Kim Scott ; Siegel, Nathan Phillip [1] + Show Author Affiliations (Bucknell University, Lewisburg, PA) Publication Date: 2012-09-01 OSTI Identifier: 1055585 Report Number(s): SAND2012-8352 DOE Contract Number: AC04-94AL85000 Resource

  18. The Majorana Demonstrator: Progress towards showing the feasibility of a

    Office of Scientific and Technical Information (OSTI)

    76Ge neutrinoless double-beta decay experiment (Conference) | SciTech Connect The Majorana Demonstrator: Progress towards showing the feasibility of a 76Ge neutrinoless double-beta decay experiment Citation Details In-Document Search Title: The Majorana Demonstrator: Progress towards showing the feasibility of a 76Ge neutrinoless double-beta decay experiment Authors: Finnerty, P. [1] ; Elliott, Steven R. [2] ; Boswell, Melissa [2] ; Kidd, Mary [2] ; Rielage, Keith R. [2] ; Ronquest, Michael

  19. Update on Establishing the Feasibility of Lead Slowing Down Spectroscopy

    Office of Scientific and Technical Information (OSTI)

    for Direct Measurement of Plutonium in Used Fuel (Conference) | SciTech Connect Conference: Update on Establishing the Feasibility of Lead Slowing Down Spectroscopy for Direct Measurement of Plutonium in Used Fuel Citation Details In-Document Search Title: Update on Establishing the Feasibility of Lead Slowing Down Spectroscopy for Direct Measurement of Plutonium in Used Fuel Developing a method for the accurate, direct, and independent assay of the fissile isotopes in bulk materials (such

  20. Heat pipe radiation cooling (HPRC) for high-speed aircraft propulsion. Phase 2 (feasibility) final report

    SciTech Connect (OSTI)

    Martin, R.A.; Merrigan, M.A.; Elder, M.G.; Sena, J.T.; Keddy, E.S.; Silverstein, C.C.

    1994-03-25

    The National Aeronautics and Space Administration (NASA), Los Alamos National Laboratory (Los Alamos), and CCS Associates are conducting the Heat Pipe Radiation Cooling (HPRC) for High-Speed Aircraft Propulsion program to determine the advantages and demonstrate the feasibility of using high-temperature heat pipes to cool hypersonic engine components. This innovative approach involves using heat pipes to transport heat away from the combustor, nozzle, or inlet regions, and to reject it to the environment by thermal radiation from adjacent external surfaces. HPRC is viewed as an alternative (or complementary) cooling technique to the use of pumped cryogenic or endothermic fuels to provide regenerative fuel or air cooling of the hot surfaces. The HPRC program has been conducted through two phases, an applications phase and a feasibility phase. The applications program (Phase 1) included concept and assessment analyses using hypersonic engine data obtained from US engine company contacts. The applications phase culminated with planning for experimental verification of the HPRC concept to be pursued in a feasibility program. The feasibility program (Phase 2), recently completed and summarized in this report, involved both analytical and experimental studies.

  1. The technical and economic feasibility of establishing a building system integration laboratory

    SciTech Connect (OSTI)

    Crawley, D.B.; Drost, M.K.; Johnson, B.M.

    1989-09-01

    On December 22, 1987, the US Congress provided funding to the US Department of Energy (DOE) to study the feasibility and conceptual design of a whole building system integration laboratory'' (Title II of Pub. L. 100--202). A whole-building system integration laboratory would be a full-scale experimental facility in which the energy performance interactions of two or more building components, e.g., walls, windows, lighting, could be tested under actual operating conditions. At DOE's request, the Pacific Northwest Laboratory (PNL) conducted the study with the assistance of a technical review and representing other federal agencies and the academic and private sectors, including professional societies, building component manufacturers, and building research organizations. The results of the feasibility study are presented in this report.

  2. Engineering feasibility analysis for in-situ stabilization of Canonsburg residues. [UMTRA project

    SciTech Connect (OSTI)

    Not Available

    1982-01-01

    The US Department of Energy is considering several methods for carrying out remedial actions in Canonsburg, Pennsylvania, at the site of an inactive uranium-processing mill. The main objective of this study is to determine the feasibility of in-situ stabilization as the remedial action. In-situ stabilization is an alternative to site decontamination and offsite disposal. The problems associated with offsite hauling of large quantities of contaminated material and with the location and development of a new disposal site could be avoided by the implementation of an in-situ stabilization concept. In addition, the in-situ approach would be more cost-effective than offsite disposal. This study will establish that a technically feasible and implementable in-situ stabilization concept can be developed that meets regulatory requirements and is cost effective. This study in no way commits the DOE to implement any specific actions described herein. 11 refs., 30 figs., 24 tabs.

  3. Investigation of the feasibility of deep microborehole drilling

    SciTech Connect (OSTI)

    Dreesen, D.S.; Cohen, J.H.

    1997-01-01

    Recent advances in sensor technology, microelectronics, and telemetry technology make it feasible to produce miniature wellbore logging tools and instrumentation. Microboreholes are proposed for subterranean telemetry installations, exploration, reservoir definition, and reservoir monitoring this assumes that very small diameter bores can be produced for significantly lower cost using very small rigs. A microborehole production concept based on small diameter hydraulic or pneumatic powered mechanical drilling, assemblies deployed on coiled tubing is introduced. The concept is evaluated using, basic mechanics and hydraulics, published theories on rock drilling, and commercial simulations. Small commercial drill bits and hydraulic motors were selected for laboratory scale demonstrations. The feasibility of drilling deep, directional, one to two-inch diameter microboreholes has not been challenged by the results to date. Shallow field testing of prototype systems is needed to continue the feasibility investigation.

  4. Technical and economical feasibility of coiled tubing drilling

    SciTech Connect (OSTI)

    Gary, S.C.; Doremus, D.M.

    1995-12-31

    The technique for evaluating coiled tubing (CT) drilling prospects is described. The technical and economic factors involved are discussed using a flowchart to guide the operator in the decision making process. In the technical analysis, the parameters limiting the feasibility of using CT for a given drilling project are reviewed. These parameters include CT tension, helical buckling which limits the weight on bit (WOB) and the horizontal reach, CT collapse pressure when drilling underbalanced, CT fatigue, and the usual hydraulic parameters such as annular velocity and pumping pressure. In today`s business environment, some projects, while technically feasible, may not be economically feasible. In the economic analysis, the competitiveness of each CT drilling application versus conventional solutions is evaluated, and factors such as project duration and equipment use are reviewed. The equipment normally required for a CT drilling job and the costs associated with mobilizing this equipment are discussed.

  5. Feasibility of establishing and operating a generic oil shale test facility

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    The December 19, 1985, Conference Report on House Joint Resolution 465, Further continuing appropriations for Fiscal Year 1986, included instruction to DOE to conduct a feasibility study for a generic oil shale test facility. The study was completed, as directed, and its findings are documented in this report. To determine the feasibility of establishing and operating such a facility, the following approach was used: examine the nature of the resource, and establish and basic functions associated with recovery of the resource; review the history of oil shale development to help put the present discussion in perspective; describe a typical oil shale process; define the relationship between each oil shale system component (mining, retorting, upgrading, environmental) and its cost. Analyze how research could reduce costs; and determine the scope of potential research for each oil shale system component.

  6. Half Moon Cove Tidal Project. Feasibility report

    SciTech Connect (OSTI)

    Not Available

    1980-11-01

    The proposed Half Moon Cove Tidal Power Project would be located in a small cove in the northern part of Cobscook Bay in the vicinity of Eastport, Maine. The project would be the first tidal electric power generating plant in the United States of America. The basin impounded by the barrier when full will approximate 1.2 square miles. The average tidal range at Eastport is 18.2 feet. The maximum spring tidal range will be 26.2 feet and the neap tidal range 12.8 feet. The project will be of the single pool-type single effect in which generation takes place on the ebb tide only. Utilizing an average mean tidal range of 18.2 feet the mode of operation enables generation for approximately ten and one-half (10-1/2) hours per day or slightly in excess of five (5) hours per tide. The installed capacity will be 12 MW utilizing 2 to 6 MW units. An axial flow, or Bulb type of turbine was selected for this study.

  7. Lake Michigan Offshore Wind Feasibility Assessment

    SciTech Connect (OSTI)

    Boezaart, Arnold; Edmonson, James; Standridge, Charles; Pervez, Nahid; Desai, Neel; Williams, Bruce; Clark, Aaron; Zeitler, David; Kendall, Scott; Biddanda, Bopi; Steinman, Alan; Klatt, Brian; Gehring, J. L.; Walter, K.; Nordman, Erik E.

    2014-06-30

    The purpose of this project was to conduct the first comprehensive offshore wind assessment over Lake Michigan and to advance the body of knowledge needed to support future commercial wind energy development on the Great Lakes. The project involved evaluation and selection of emerging wind measurement technology and the permitting, installation and operation of the first mid-lake wind assessment meteorological (MET) facilities in Michigan’s Great Lakes. In addition, the project provided the first opportunity to deploy and field test floating LIDAR and Laser Wind Sensor (LWS) technology, and important research related equipment key to the sitting and permitting of future offshore wind energy development in accordance with public participation guidelines established by the Michigan Great Lakes Wind Council (GLOW). The project created opportunities for public dialogue and community education about offshore wind resource management and continued the dialogue to foster Great Lake wind resource utilization consistent with the focus of the GLOW Council. The technology proved to be effective, affordable, mobile, and the methods of data measurement accurate. The public benefited from a substantial increase in knowledge of the wind resources over Lake Michigan and gained insights about the potential environmental impacts of offshore wind turbine placements in the future. The unique first ever hub height wind resource assessment using LWS technology over water and development of related research data along with the permitting, sitting, and deployment of the WindSentinel MET buoy has captured public attention and has helped to increase awareness of the potential of future offshore wind energy development on the Great Lakes. Specifically, this project supported the acquisition and operation of a WindSentinel (WS) MET wind assessment buoy, and associated research for 549 days over multiple years at three locations on Lake Michigan. Four research objectives were defined for the project including to: 1) test and validate floating LIDAR technology; 2) collect and access offshore wind data; 3) detect and measure bird and bat activity over Lake Michigan; 4) conduct an over water sound propagation study; 5) prepare and offer a college course on offshore energy, and; 6) collect other environmental, bathometric, and atmospheric data. Desk-top research was performed to select anchorage sites and to secure permits to deploy the buoy. The project also collected and analyzed data essential to wind industry investment decision-making including: deploying highly mobile floating equipment to gather offshore wind data; correlating offshore wind data with conventional on-shore MET tower data; and performing studies that can contribute to the advancement and deployment of offshore wind technologies. Related activities included: • Siting, permitting, and deploying an offshore floating MET facility; • Validating the accuracy of floating LWS using near shoreline cup anemometer MET instruments; • Assessment of laser pulse technology (LIDAR) capability to establish hub height measurement of wind conditions at multiple locations on Lake Michigan; • Utilizing an extended-season (9-10 month) strategy to collect hub height wind data and weather conditions on Lake Michigan; • Investigation of technology best suited for wireless data transmission from distant offshore structures; • Conducting field-validated sound propagation study for a hypothetical offshore wind farm from shoreline locations; • Identifying the presence or absence of bird and bat species near wind assessment facilities; • Identifying the presence or absence of benthic and pelagic species near wind assessment facilities; All proposed project activities were completed with the following major findings: • Floating Laser Wind Sensors are capable of high quality measurement and recordings of wind resources. The WindSentinel presented no significant operational or statistical limitations in recording wind data technology at a at a high confidence level as compared to traditional anemometer cup technology. • During storms, mean Turbulent Kinetic Energy (TKE) increases with height above water; • Sufficient wind resources exist over Lake Michigan to generate 7,684 kWh of power using a 850 kW rated turbine at elevations between 90 - 125 meters, a height lower than originally anticipated for optimum power generation; • Based on initial assessments, wind characteristics are not significantly different at distant (thirty-two mile) offshore locations as compared to near-shore (six mile) locations; • Significant cost savings can be achieved in generation wind energy at lower turbine heights and locating closer to shore. • Siting must be sufficiently distant from shore to minimize visual impact and to address public sentiment about offshore wind development; • Project results show that birds and bats do frequent the middle of Lake Michigan, bats more so than birds; • Based on the wind resource assessment and depths of Lake Michigan encountered during the project, future turbine placement will most likely need to incorporate floating or anchored technology; • The most appropriate siting of offshore wind energy locations will enable direct routing of transmission cables to existing generating and transmission facilities located along the Michigan shoreline; • Wind turbine noise propagation from a wind energy generating facility at a five mile offshore location will not be audible at the shoreline over normal background sound levels.

  8. Winnebago Tribe - Wind Feasibility Project and Energy Options Analysis and Organizational Development

    Energy Savers [EERE]

    Winnebago Tribe of Nebraska Energy Options Analysis and Renewable Energy Feasibility Study U.S. Department of Energy Tribal Energy Program Review Leah Hunter, Energy Committee Member, Winnebago Tribe of Nebraska Tracey LeBeau, Red Mountain Energy Partners October 2006 Project Location 1 © 2006 All Rights Reserved Project Location >> Winnebago Tribe of Nebraska Winnebago Reservation: 120,000 acres; 88 miles north of Omaha, NE Project Location 2 © 2006 All Rights Reserved Project Location

  9. Feasibility report on criticality issues associated with storage of K Basin sludge in tanks farms

    SciTech Connect (OSTI)

    Vail, T.S.

    1997-05-29

    This feasibility study provides the technical justification for conclusions about K Basin sludge storage options. The conclusions, solely based on criticality safety considerations, depend on the treatment of the sludge. The two primary conclusions are, (1) untreated sludge must be stored in a critically safe storage tank, and (2) treated sludge (dissolution, precipitation and added neutron absorbers) can be stored in a standard Double Contained Receiver Tank (DCRT) or 241-AW-105 without future restrictions on tank operations from a criticality safety perspective.

  10. Canby Cascaded Geothermal Project Phase 1 Feasibility | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy Canby Cascaded Geothermal Project Phase 1 Feasibility presentation at the April 2013 peer review meeting held in Denver, Colorado. PDF icon canby_cascaded_peer2013.pdf More Documents & Publications Rural Cooperative Geothermal Development Electric & Agriculture Silver Peak Innovative Exploration Project Advanced 3D Geophysical Imaging Technologies for Geothermal Resource Characterization

  11. Feasibility of geothermal heat use in the San Bernardino Municipal Wastewater Treatment Plant. Final report, September 1980-June 1981

    SciTech Connect (OSTI)

    Racine, W.C.; Larson, T.C.; Stewart, C.A.; Wessel, H.B.

    1981-06-01

    The results of the feasibility study for utilizing low temperature geothermal heat in the City of San Bernardino Wastewater Treatment Plant are summarized. The study is presented in terms of preliminary engineering design, economic analysis, institutional issues, environmental impacts, resource development, and system implementation.

  12. Vessel Cold-Ironing Using a Barge Mounted PEM Fuel Cell: Project Scoping and Feasibility.

    SciTech Connect (OSTI)

    Pratt, Joseph William; Harris, Aaron P

    2013-01-01

    A barge-mounted hydrogen-fueled proton exchange membrane (PEM) fuel cell system has the potential to reduce emissions and fossil fuel use of maritime vessels in and around ports. This study determines the technical feasibility of this concept and examines specific options on the U.S. West Coast for deployment practicality and potential for commercialization.The conceptual design of the system is found to be straightforward and technically feasible in several configurations corresponding to various power levels and run times.The most technically viable and commercially attractive deployment options were found to be powering container ships at berth at the Port of Tacoma and/or Seattle, powering tugs at anchorage near the Port of Oakland, and powering refrigerated containers on-board Hawaiian inter-island transport barges. Other attractive demonstration options were found at the Port of Seattle, the Suisun Bay Reserve Fleet, the California Maritime Academy, and an excursion vessel on the Ohio River.

  13. Department of Energy Small-Scale Hydropower Program: Feasibility assessment and technology development summary report

    SciTech Connect (OSTI)

    Rinehart, B.N.

    1991-06-01

    This report summarizes two subprograms under the US Department of Energy's Small-Scale Hydroelectric Power Program. These subprograms were part of the financial assistance activities and included the Program Research and Development Announcement (PRDA) feasibility assessments and the technology development projects. The other major subprograms included engineering research and development, legal and institutional aspects, and technology transfer. These other subprograms are covered in their respective summary reports. The problems of energy availability and increasing costs of energy led to a national effort to develop economical and environmental attractive alternative energy resources. One such alternative involved the utilization of existing dams with hydraulic heads of <65 ft and the capacity to generate hydroelectric power of 15 MW or less. Thus, the PRDA program was initiated along with the Technology Development program. The purpose of the PRDA feasibility studies was to encourage development of renewable hydroelectric resources by providing engineering, economic, environmental, safety, and institutional information. Fifty-five feasibility studies were completed under the PRDA. This report briefly summarizes each of those projects. Many of the PRDA projects went on to become technology development projects. 56 refs., 1 fig., 2 tabs.

  14. Feasibility evaluation of fuel cells for selected heavy-duty transportation systems

    SciTech Connect (OSTI)

    Huff, J.R.; Murray, H.S.

    1982-10-01

    A study of the feasibility of using fuel cell power plants for heavy duty transportation applications is performed. It is concluded that it will be feasible to use fuel cell technology projected as being available by 1995 to 2000 for powering 3000-hp freight locomotives and 6000-hp river boats. The fuel cell power plant is proposed as an alternative to the currently used diesel or diesel-electric system. Phosphoric acid and solid polymer electrolyte fuel cells are determined to be the only applicable technologies in the desired time frame. Methanol, chemically reformed to produce hydrogen, is determined to be the most practical fuel for the applications considered. Feasibility is determined on the basis of weight and volume constraints, compatibility with existing propulsion components, and adequate performance relative to operational requirements. Simulation results show that performance goals are met and that overall energy consumption of heavy duty fuel cell power plants is lower than that of diesels for the same operating conditions. Overall energy consumption is substantially improved over diesel operation for locomotives. Operating cost comparisons are made using assumed diesel fuel and methanol costs. Development areas are identified to achieve the desired fuel cell capabilities. The required activities are in the areas of fuel cell electrode performance, catalyst development, fuel processing, controls, power conditioning, and system integration.

  15. Feasibility of SF6 Gas-Insulated Transformers

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Feasibility of SF 6 Gas-Insulated Transformers Brandon Bouwman, P.E. Electrical Engineer, Generation Equipment Section Hydroelectric Design Center 14 June 2012 BUILDING STRONG ® PORTLAND DISTRICT 2 Outline  Transformer Background & Basics  Oil-filled transformers  Oil-filled transformer concerns  Gas-insulated transformers (GIT)  Gas-insulated transformer benefits  Gas-insulated transformer concerns  Risks and Unknowns  Questions? BUILDING STRONG ® PORTLAND DISTRICT

  16. Economic Feasibility of Electrochemical Caustic Recycling at the Hanford Site

    SciTech Connect (OSTI)

    Poloski, Adam P.; Kurath, Dean E.; Holton, Langdon K.; Sevigny, Gary J.; Fountain, Matthew S.

    2009-03-01

    This report contains a review of potential cost benefits of NaSICON Ceramic membranes for the separation of sodium from Hanford tank waste. The primary application is for caustic recycle to the Waste Treatment and Immobilization Plant (WTP) pretreatment leaching operation. The report includes a description of the waste, the benefits and costs for a caustic-recycle facility, and Monte Carlo results obtained from a model of these costs and benefits. The use of existing cost information has been limited to publicly available sources. This study is intended to be an initial evaluation of the economic feasibility of a caustic recycle facility based on NaSICON technology. The current pretreatment flowsheet indicates that approximately 6,500 metric tons (MT) of Na will be added to the tank waste, primarily for removing Al from the high-level waste (HLW) sludge (Kirkbride et al. 2007). An assessment (Alexander et al. 2004) of the pretreatment flowsheet, equilibrium chemistry, and laboratory results indicates that the quantity of Na required for sludge leaching will increase by 6,000 to 12,000 MT in order to dissolve sufficient Al from the tank-waste sludge material to maintain the number of HLW canisters produced at 9,400 canisters as defined in the Office of River Protection (ORP) System Plan (Certa 2003). This additional Na will significantly increase the volume of LAW glass and extend the processing time of the Waste Treatment and Immobilization Plant (WTP). Future estimates on sodium requirements for caustic leaching are expected to significantly exceed the 12,000-MT value and approach 40,000-MT of total sodium addition for leaching (Gilbert, 2007). The cost benefit for caustic recycling is assumed to consist of four major contributions: 1) the cost savings realized by not producing additional immobilized low-activity waste (ILAW) glass, 2) caustic recycle capital investment, 3) caustic recycle operating and maintenance costs, and 4) research and technology costs needed to deploy the technology. In estimating costs for each of these components, several parameters are used as inputs. Due to uncertainty in assuming a singular value for each of these parameters, a range of possible values is assumed. A Monte Carlo simulation is then performed where the range of these parameters is exercised, and the resulting range of cost benefits is determined.

  17. Technical Feasibility Assessment of LED Roadway Lighting on the Golden Gate Bridge

    SciTech Connect (OSTI)

    Tuenge, J. R.

    2012-09-01

    GATEWAY program report on the technical feasibility of LED roadway lighting on the Golden Gate Bridge in San Francisco, CA.

  18. Assessing the Feasibility of Renewable Energy Development and Energy Efficiency Deployment on Tribal Lands

    SciTech Connect (OSTI)

    Nominelli, Gregg R.

    2012-12-17

    The Keweenaw Bay Indian Community (KBIC) is committed to preserving our natural environment and reducing the amount of fossil fuels consumed while developing "green" business manufacturing jobs on tribal lands. The Tribe's Comprehensive Strategic Plan seeks to diversify the Tribal Economy through the creation of alternative energy businesses, such as wind, solar and bio-mass facilities while protecting the waters of Lake Superior, tribal inland lakes and streams. In addition, the Community desired to utilize clean/green energy resources to promote the self-sufficiency of the Tribal Nation. The objective of the study is to preserve our environment and maintain our cultural goals of using the resources of the land wisely. To reduce our consumption of fossil fuels, mercury and carbon dioxide emissions, which harm our water and land; we have decided to evaluate the opportunities of utilizing wind power. Preliminary projections show that we may eliminate pollution from our land in a cost effective manner. This study will evaluate wind capacity and our current energy consumption while projecting the feasibility of converting to wind power for operations at our major facilities. This project will study the feasibility of wind power at two locations for the purpose of reducing the Tribe's reliance upon fossil fuels and creating business opportunities, jobs and revenue for the community.

  19. CX-009011: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Feasibility Study Supporting Wind Development on the Standing Rock Sioux Tribe Indian Reservation CX(s) Applied: A9, B1.19, B3.1 Date: 08/29/2012 Location(s): South Dakota Offices(s): Golden Field Office

  20. CX-001941: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Renewable Energy Enterprise Zones (REEZ) Amalgamated Sugar Biogas Feasibility Study (Nampa #1)CX(s) Applied: A9, A11Date: 02/10/2010Location(s): Nampa, IdahoOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office