National Library of Energy BETA

Sample records for fans test procedure

  1. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    (DOE) has published a final rule regarding test procedures for residential furnace fans. 79 FR 500 (January 3, 2014). Find more information on the rulemaking, including milestones,...

  2. Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces Fans; Correction

    Broader source: Energy.gov [DOE]

    On January 3, 2014 the U.S. Department of Energy (DOE) published a final rule in the Federal Register that established the test procedure for residential furnace fans. Due to drafting errors, that document inadvertently removed necessary incorporation by reference material in the Code of Federal Regulations (CFR). This final rule rectifies this error by once again adding the removed material.

  3. ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule. ceilingfanstpsnopr.pdf More Documents & Publications 2014-09-19 Issuance: Energy Conservation...

  4. Modeling, Control, and Flight Testing of a Small Ducted Fan Aircraft

    E-Print Network [OSTI]

    Johnson, Eric N.

    1 Modeling, Control, and Flight Testing of a Small Ducted Fan Aircraft Eric N. Johnson* and Michael A. Turbe Georgia Institute of Technology, Atlanta, GA, 30332 Small ducted fan autonomous vehicles for the GTSpy, a small ducted fan autonomous vehicle based on the Micro Autonomous Systems' Helispy

  5. Modeling of ECM Controlled Series Fan-powered VAV Terminal Units 

    E-Print Network [OSTI]

    Yin, Peng

    2011-10-21

    Semi-empirical models for series fan-powered variable air volume terminal units (FPTUs) were developed based on models of the primary, plenum, fan airflow and the fan power consumption. The experimental setups and test procedures were developed...

  6. Performance of ECM controlled VAV fan powered terminal units 

    E-Print Network [OSTI]

    Cramlet, Andrew Charles

    2009-05-15

    Empirical performance models of fan airflow, primary airflow and power consumption were developed for series and parallel variable air volume fan powered terminal units. An experimental setup and test procedure were created to test the terminal...

  7. Energy Conservation Standards for Ceiling Fan Light Kits Notice...

    Office of Environmental Management (EM)

    for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking...

  8. Online Test Proctoring Request Procedures

    E-Print Network [OSTI]

    Stuart, Steven J.

    Online Test Proctoring Request Procedures #12;Documentation last updated: Friday, January 17, 2014 Page | 2 of 10 Online Test Proctoring Request Form Procedures Contents Test Proctoring Center (TPC............................................................................................................................... 10 #12;Documentation last updated: Friday, January 17, 2014 Page | 3 of 10 Test Proctoring Center

  9. Fan Aerodynamic Performance Guarantees: Do Your Policies, Procedures and Penalties Provide Adequate Certainty? 

    E-Print Network [OSTI]

    Kaufman, S. G.; Martin, V.; Falk, M. A.

    2004-01-01

    With few exceptions, fan vendors do not provide a written guarantee regarding aerodynamic performance. Some fan vendors even go so far as to state in their terms and conditions of sale that fan performance is not guaranteed unless it is specifically...

  10. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based| Department ofRefrigeratorsDepartment ofHeat PumpPlan|DepartmentDepartment

  11. Design, testing and two-dimensional flow modeling of a multiple-disk fan

    SciTech Connect (OSTI)

    Engin, Tahsin; Oezdemir, Mustafa; Cesmeci, Sevki [Department of Mechanical Engineering, The University of Sakarya, Esentepe Campus, 54187 Sakarya (Turkey)

    2009-11-15

    A multiple-disk Tesla type fan has been designed, tested and analyzed two-dimensionally using the conservation of angular momentum principle. Experimental results showed that such multiple-disk fans exhibited exceptionally low performance characteristics, which could be attributed to the low viscosity, tangential nature of the flow, and large mechanical energy losses at both suction and discharge sections that are comparable to the total input power. By means of theoretical analysis, local and overall shearing stresses on the disk surfaces have been determined based on tangential and radial velocity distributions of the air flow of different volume flow rates at prescribed disk spaces and rotational speeds. Then the total power transmitted by rotating disks to air flow, and the power acquired by the air flow in the gap due to transfer of angular momentum have been obtained by numerically integrating shearing stresses over the disk surfaces. Using the measured shaft and hydraulic powers, these quantities were utilized to evaluate mechanical energy losses associated with the suction and discharge sections of the fan. (author)

  12. Modeling of Electronically Commutated Motor Controlled Fan-powered Terminal Units 

    E-Print Network [OSTI]

    Edmondson, Jacob Lee

    2011-02-22

    : Dr. Dennis O?Neal Empirical models of airflow and power consumption were developed for series and parallel variable air volume fan powered terminal units (FPTUs). An experimental setup and test procedure were developed to test the terminal... (THD) was also recorded and presented. For the series terminal units, models were developed for fan airflow, fan power, and primary airflow. The models for fan airflow all had R2 values above 0.987. The iv models for fan power all had R2 values...

  13. Development of a Fan-Filter Unit Test Standard, Laboratory Validations, and its Applications across Industries

    E-Print Network [OSTI]

    Xu, Tengfang

    2008-01-01

    Fan Filter Units for Cleanroom Applications. ” Building andFeedback Control in a Cleanroom. ” Building and Environment.energy costs dictate cleanroom design. CleanRooms, February

  14. CONTROL VALVE TESTING PROCEDURES AND EQUATIONS

    E-Print Network [OSTI]

    Rahmeyer, William J.

    APPENDIX A CONTROL VALVE TESTING PROCEDURES AND EQUATIONS FOR LIQUID FLOWS #12;APPENDIX A CONTROL VALVE TESTING PROCEDURES AND EQUATIONS FOR LIQUID FLOWS 2 Cv Q P Sg net gpm net = / Cv = Q P / Sg 75 is used to relate the pressure loss of a valve to the discharge of the valve at a given valve opening

  15. Development of models for series and parallel fan variable air volume terminal units 

    E-Print Network [OSTI]

    Furr, James C., Jr

    2007-09-17

    Empirical models of airflow output and power consumption were developed for series and parallel fan powered variable air volume terminal units at typical design pressure conditions. A testing procedure and experimental setup were developed to test...

  16. Development of a Fan-Filter Unit Test Standard, LaboratoryValidations, and its Applications across Industries

    SciTech Connect (OSTI)

    Xu, Tengfang

    2006-10-20

    Lawrence Berkeley National Laboratory (LBNL) is now finalizing the Phase 2 Research and Demonstration Project on characterizing 2-foot x 4-foot (61-cm x 122-cm) fan-filter units in the market using the first-ever standard laboratory test method developed at LBNL.[1][2][3] Fan-filter units deliver re-circulated air and provide particle filtration control for clean environments. Much of the energy in cleanrooms (and minienvironments) is consumed by 2-foot x 4-foot (61-cm x 122-cm) or 4-foot x 4-foot (122-cm x 122-cm) fan-filter units that are typically located in the ceiling (25-100% coverage) of cleanroom controlled environments. Thanks to funding support by the California Energy Commission's Industrial Program of the Public Interest Energy Research (PIER) Program, and significant participation from manufacturers and users of fan-filter units from around the world, LBNL has developed and performed a series of standard laboratory tests and reporting on a variety of 2-foot x 4-foot (61-cm x 122-cm) fan-filter units (FFUs). Standard laboratory testing reports have been completed and reported back to anonymous individual participants in this project. To date, such reports on standard testing of FFU performance have provided rigorous and useful data for suppliers and end users to better understand, and more importantly, to quantitatively characterize performance of FFU products under a variety of operating conditions.[1] In the course of the project, the standard laboratory method previously developed at LBNL has been under continuous evaluation and update.[2][3] Based upon the updated standard, it becomes feasible for users and suppliers to characterize and evaluate energy performance of FFUs in a consistent way.

  17. DOT-7A packaging test procedure

    SciTech Connect (OSTI)

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  18. DOE Publishes Final Rule for Television Test Procedure | Department...

    Broader source: Energy.gov (indexed) [DOE]

    DOE Publishes Final Rule for Plumbing Products Test Procedures DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure...

  19. ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures...

  20. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Battery...

  1. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule...

  2. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures...

    Energy Savers [EERE]

    06-26: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule...

  3. CRAD, System Operating Test Procedures - October 23, 2014 (EA...

    Broader source: Energy.gov (indexed) [DOE]

    criteria, and approaches for reviewing startup testing procedures for installed structures, systems, or components. CRAD, System Operating Test Procedures - October 23, 2014...

  4. Meeting Concerning Potential Test Procedures and Energy Conservation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Meeting Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy...

  5. Advanced Energy-Efficient Filtration: Fan Filter Unit

    SciTech Connect (OSTI)

    Xu, Tengfang

    2005-10-01

    The objective of this project is to provide assistance in development of a standard test procedure for fan-filter units, which are gaining popularity for use in California cleanrooms. In particular, LBNL carried out collaboration with various stakeholders in the industry and took a lead in developing a draft standard method for testing the energy performance of fan-filter units, and provided assistance to California public utility companies by testing the draft method in PG&E's testing facility. Through testing more units in the future with a robust standard method, baseline performance information can be developed for use in possible energy incentive programs.

  6. Qualification of Fan Generated Duct Rumble Noise: Part 1: Test Facility(RP 1219) 

    E-Print Network [OSTI]

    Kading, J.; Mann, A.; Pate, M.B.

    2008-01-01

    :4. The transition was enclosed in a 53” by 93” by 3’ tall box constructed from MDF and lined with 2” duct board fiber- glass. The box was designed to isolate the transition duct from break in noise from the fan room. The fiberglass insulation on the inside... (MDF) shell that was mounted on a 2x4 structure. The interior consisted of three layers. The first was fiberglass board 2’x 4’ x 2”, these boards were cut to be stacked and fill in between the MDF and the duct lining insu- lation. The second layer...

  7. ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule. beveragevendingmachinetpfinalrule.pdf More Documents &...

  8. Operator coil monitoring acceptance test procedure

    SciTech Connect (OSTI)

    Erhart, M.F.

    1995-06-05

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  9. Operator coil monitoring Acceptance Test Procedure

    SciTech Connect (OSTI)

    Erhart, M.F.

    1995-05-16

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the Programmable Logic Controller (PLC) abort coils from the Master and RSS stations will be systematically tested during performance of this procedure. It should be noted that these are not physical abort coils but software coils controlled by the software`s ladder logic. The readiness of the DACS to properly interface with the ENRAF wire level gauge installed in the SY-101 storage tank will also be tested. During this test, a verification of all abort coil indications will be conducted at the DACS Development Facility in the 306E Building by injecting an input signal for each DACS sensor that has an associated abort coil until the abort coil actuates, and then ensuring that the status of the abort coil indicated at the Master and RSS stations is correct. Each abort coil will also be tested to ensure that the ``ENABLE`` and ``DISABLE`` controls from the Master and RSS stations function correctly, and only with the use of proper passwords.

  10. 2014-10-29 Issuance: Energy Conservation Program: Test Procedures...

    Energy Savers [EERE]

    2014-10-29 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting 2014-10-29 Issuance: Energy Conservation Program: Test...

  11. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...

    Energy Savers [EERE]

    DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes DOE Withdraws Proposed Rulemaking (Test...

  12. 2014-10-16 Issuance: Energy Conservation Program Test Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting clothesdryernopm.pdf More Documents & Publications 2014-01-31 Issuance: Test...

  13. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...

    Broader source: Energy.gov (indexed) [DOE]

    (DOE) has issued a pre-publication Federal Register final rule regarding test procedures for electric motors. For more information, please visit the rulemaking page. Test...

  14. ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures...

    Energy Savers [EERE]

    05: Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking ISSUANCE 2015-06-05: Energy Conservation Program: Test...

  15. Laboratory procedures for waste form testing

    SciTech Connect (OSTI)

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  16. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits...

    Energy Savers [EERE]

    Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document. 2014-10-27...

  17. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l De p u t y A s s iof1 of 8 2 of 8 3 of 8AirResidential

  18. DOE Publishes Final Rule for Plumbing Products Test Procedures

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a final rule regarding test procedures for showerheads, faucets, water closets, urinals, and commercial prerinse spray valves.

  19. 2014-04-11 Issuance: Test Procedures for Residential Clothes...

    Broader source: Energy.gov (indexed) [DOE]

    notice of proposed rulemaking regarding test procedure amendments for residential clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 11,...

  20. Energy Conservation Program: Test Procedure for Pumps, Notice...

    Broader source: Energy.gov (indexed) [DOE]

    Related Links FAQs Contact Us Offices This document is Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking. commercialindustrialpumpstpnopr...

  1. Meeting Concerning Potential Test Procedures and Energy Conservation...

    Broader source: Energy.gov (indexed) [DOE]

    provides a summary of a March 7, 2012, meeting with DOE officials concerning potential test procedures and energy conservation standards for set-top boxes and network equipment....

  2. Ex Parte Communication on Central Air-Conditioner Test Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    with a representative from the Department of Energy (DOE) to discuss proposed amended test procedures for central air conditioners and how they would impact ICM manufacturers....

  3. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration...

    Broader source: Energy.gov (indexed) [DOE]

    final rule regarding test procedures for commercial refrigeration equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014. Though it is not...

  4. 2014-05-05 Issuance: Test Procedures for Dehumidifiers; Notice...

    Broader source: Energy.gov (indexed) [DOE]

    notice of proposed rulemaking regarding test procedures for dehumidifiers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 2, 2014. Though it is not...

  5. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures...

    Energy Savers [EERE]

    ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule ISSUANCE 2015-06-08: Energy...

  6. AVTA: Transit Vehicle Specifications and Test Procedures

    Broader source: Energy.gov [DOE]

    All Advanced Vehicle Testing Activity transit projects follow a rigorous data collection and analysis protocol. Refer to "General Evaluation Plan: Fleet Test and Evaluation Projects" for...

  7. Integrated Performance Testing Workshop - Supplemental Materials (Scripts and Procedures)

    SciTech Connect (OSTI)

    Baum, Gregory A.

    2014-02-01

    A variety of performance tests are described relating to: Material Transfers; Emergency Evacuation; Alarm Response Assessment; and an Enhanced Limited Scope Performance Test (ELSPT). Procedures are given for: nuclear material physical inventory and discrepancy; material transfers; and emergency evacuation.

  8. Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-08-14

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  9. Rocky Flats ash test procedure (sludge stabilization)

    SciTech Connect (OSTI)

    Winstead, M.L.

    1995-09-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. This test will also gain information on the effects of the glovebox atmosphere (moisture) on the stabilized material. This document provides instructions for testing Rocky Flats Ash in the HC-21C muffle furnace process.

  10. Rocky Flats Ash test procedure (sludge stabilization)

    SciTech Connect (OSTI)

    Funston, G.A.

    1995-06-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. The test will provide information to determine charge sizes, soak times and mesh screen sizes (if available at time of test) for stabilization of Rocky Flats Ash items to be processed in the HC-21C Muffle Furnace Process. Once the charge size and soak times have been established, a program for the temperature controller of the HC-21C Muffle Furnace process will be generated for processing Rocky Flats Ash.

  11. Vehicle Technologies Office: Integration, Validation and Testing Tools and Procedures

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office supports work to integrate multiple fuel-efficient technologies into a vehicle through hardware-in-the-loop systems. It also supports the development and use of test procedures to measure real-world vehicle performance.

  12. Webinar: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the notice of proposed rulemaking regarding test procedures for residential dehumifiers. 79 FR 29271 (May 22, 2014). For more information, please...

  13. Webinar: Test Procedure for Battery Chargers; Notice of Data Availability

    Broader source: Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the notice of data availability regarding test procedures for battery chargers. 79 FR 27774  (May 15, 2014). For more information, please visit...

  14. An Innovative Method for Dynamic Characterization of Fan FilterUnit Operation.

    SciTech Connect (OSTI)

    Xu, Tengfang

    2006-12-21

    Fan filter units (FFU) are widely used to deliver re-circulated air while providing filtration control of particle concentration in controlled environments such as cleanrooms, minienvironments, and operating rooms in hospitals. The objective of this paper is to document an innovative method for characterizing operation and control of an individual fan filter unit within its operable conditions. Built upon the draft laboratory method previously published [1] , this paper presents an updated method including a testing procedure to characterize dynamic operation of fan filter units, i.e., steady-state operation conditions determined by varied control schemes, airflow rates, and pressure differential across the units. The parameters for dynamic characterization include total electric power demand, total pressure efficiency, airflow rate, pressure differential across fan filter units, and airflow uniformity.

  15. Sequential test procedures for inventory differences

    SciTech Connect (OSTI)

    Goldman, A.S.; Kern, E.A.; Emeigh, C.W.

    1985-01-01

    By means of a simulation study, we investigated the appropriateness of Page's and power-one sequential tests on sequences of inventory differences obtained from an example materials control unit, a sub-area of a hypothetical UF/sub 6/-to-U/sub 3/O/sub 8/ conversion process. The study examined detection probability and run length curves obtained from different loss scenarios. 12 refs., 10 figs., 2 tabs.

  16. Flammable gas interlock spoolpiece flow response test plan and procedure

    SciTech Connect (OSTI)

    Schneider, T.C., Fluor Daniel Hanford

    1997-02-13

    The purpose of this test plan and procedure is to test the Whittaker electrochemical cell and the Sierra Monitor Corp. flammable gas monitors in a simulated field flow configuration. The sensors are used on the Rotary Mode Core Sampling (RMCS) Flammable Gas Interlock (FGI), to detect flammable gases, including hydrogen and teminate the core sampling activity at a predetermined concentration level.

  17. Operational test procedure for SY tank farm replacement exhauster unit

    SciTech Connect (OSTI)

    McClees, J.

    1995-09-26

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly.

  18. 2014-01-31 Issuance: Test Procedures for Commercial Clothes Washers...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issuance: Test Procedures for Commercial Clothes Washers; Notice of Proposed Rulemaking 2014-01-31 Issuance: Test Procedures for Commercial Clothes Washers; Notice of Proposed...

  19. 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6-18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-06-18 Issuance: Test Procedure for Integrated...

  20. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect (OSTI)

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  1. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  2. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-03

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  3. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  4. 100 Area soil washing bench-scale test procedures

    SciTech Connect (OSTI)

    Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

    1993-03-01

    This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing.

  5. Test Procedure for 170.302.h Incorporate Laboratory Test Results APPROVED Version 1.1 September 24, 2010

    E-Print Network [OSTI]

    Test Procedure for §170.302.h Incorporate Laboratory Test Results APPROVED Version 1.1 September 24, 2010 1 Test Procedure for §170.302 (h) Incorporate Laboratory Test Results This document describes the test procedure for evaluating conformance of complete EHRs or EHR modules1

  6. 2015-12-29 Consumer Furnaces and Boilers Test Procedures Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Consumer Products: Test Procedures for Consumer Furnaces and Boilers

  7. Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

  8. Record of Communication Concerning Ceiling Fan and Ceiling Fan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Record of Communication Concerning Ceiling Fan and Ceiling Fan Light Kit Framework Document-Docket No. EERE-2012-BT-STD-0045 Record of Communication Concerning Ceiling Fan and...

  9. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    SciTech Connect (OSTI)

    Flanagan, B.D.

    1995-07-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the {open_quotes}Free Drop Test{close_quotes} procedure for the SPM-1 package.

  10. DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding the compliance date for the dehumidifier test procedure.

  11. Synchronous and Cogged Fan Belt Performance Assessment

    SciTech Connect (OSTI)

    Cutler, D.; Dean, J.; Acosta, J.

    2014-02-01

    The GSA Regional GPG Team commissioned the National Renewable Energy Laboratory (NREL) to perform monitoring of cogged V-belts and synchronous belts on both a constant volume and a variable air volume fan at the Byron G. Rodgers Federal Building and U.S. Courthouse in Denver, Colorado. These motor/fan combinations were tested with their original, standard V-belts (appropriately tensioned by an operation and maintenance professional) to obtain a baseline for standard operation. They were then switched to the cogged V-belts, and finally to synchronous belts. The power consumption by the motor was normalized for both fan speed and air density changes. This was necessary to ensure that the power readings were not influenced by a change in rotational fan speed or by the power required to push denser air. Finally, energy savings and operation and maintenance savings were compiled into an economic life-cycle cost analysis of the different belt options.

  12. ISSUANCE 2015-04-29: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters Notice of petition to extend test procedure compliance date and request for comment

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters; Notice of petition to extend test procedure compliance date and request for comment.

  13. Power and Sample Size Determination for a Stepwise Test Procedure for Finding the Maximum Safe Dose

    E-Print Network [OSTI]

    Tamhane, Ajit C.

    Power and Sample Size Determination for a Stepwise Test Procedure for Finding the Maximum Safe Dose This paper addresses the problem of power and sample size calculation for a stepwise multiple test procedure of a compound. A general expression for the power of this procedure is derived. It is used to find the minimum

  14. Smart Fan Modules And System

    DOE Patents [OSTI]

    Cipolla, Thomas M. (Katonah, NY); Kaufman, Richard I. (Somers, NY); Mok, Lawrence S. (Brewster, NY)

    2003-07-15

    A fan module including: two or more individual fans, each fan having an air movement means and a motor engaged with the air movement means for accelerating air entering each of the two or more individual fans; a temperature sensor for sensing a temperature associated with the two or more fans and for outputting a first signal corresponding to the temperature; rotational speed sensor for outputting a second signal corresponding to a rotational speed of each of the two or more fans; and a processor for receiving the first and second signals and controlling the two or more individual fans based on the first and second signals. A fan module including: two or more individual fans, each fan having an air movement means and a motor engaged with the air movement means for accelerating air entering each of the two or more individual fans; a temperature sensor for sensing a temperature associated with the two or more fans and for outputting a first signal corresponding to the temperature; rotational speed sensor for outputting a second signal corresponding to a rotational speed of each of the two or more fans; and a processor for receiving the first and second signals and controlling the two or more individual fans based on the first and second signals.

  15. Test Procedure for 170.306.h Advance Directives APPROVED Version 1.1 September 24, 2010

    E-Print Network [OSTI]

    Test Procedure for §170.306.h Advance Directives APPROVED Version 1.1 September 24, 2010 1 Test Procedure for §170.306 (h) Advance Directives This document describes the test procedure for evaluating Register on July 28, 2010. The document2 is organized by test procedure and derived test requirements

  16. Comparison of Real World Energy Consumption to Models and Department of Energy Test Procedures

    SciTech Connect (OSTI)

    Goetzler, William; Sutherland, Timothy; Kar, Rahul; Foley, Kevin

    2011-09-01

    This study investigated the real-world energy performance of appliances and equipment as it compared with models and test procedures. The study looked to determine whether the U.S. Department of Energy and industry test procedures actually replicate real world conditions, whether performance degrades over time, and whether installation patterns and procedures differ from the ideal procedures. The study first identified and prioritized appliances to be evaluated. Then, the study determined whether real world energy consumption differed substantially from predictions and also assessed whether performance degrades over time. Finally, the study recommended test procedure modifications and areas for future research.

  17. Advanced low noise cooling fans

    SciTech Connect (OSTI)

    Spek, H.F. van der; Nelissen, P.J.M.

    1995-02-01

    The results from an intensive research program show that it is possible to reduce the sound power level of cooling fans by 15 dB(A) by altering blade cord width and swept leading and trailing edge lines. Combination with the reduction of the pressure drop can result in a step of 20 dB(A) and a reduction with 25 percent of the absorbed power. Testing was conducted in accordance with recognized international measuring standards and the results will be presented, including consequences for cooling tower and condenser design.

  18. Test procedure for measurement of performance vs temperature of Whittaker electrochemical cell

    SciTech Connect (OSTI)

    Vargo, G.F.

    1997-01-23

    This document is the test procedure to systematically test the Whittaker cells between the temperatures of -20 degrees F and +120 degrees F. These sensors are used on the Rotary Mode Core Sampling (RMCS) flammable gas interlock (FGI), to detect and quantify hydrogen gas. This procedure supports the testing, that is being performed after cold weather attempts on the Whittaker cell failed.

  19. DOE Publishes Notice of Proposed Rulemaking for Direct Heating Equipment and Pool Heater Test Procedures

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for direct heating equipment and pool heaters.

  20. Fan System Assessment Tool Introduction

    Broader source: Energy.gov [DOE]

    This presentation provides an introduction to the Fan System Assessment Tool (FSAT). With FSAT, users can calculate the amount of energy used by their fan system; determine system efficiency; and quantify the savings potential of an upgraded system.

  1. ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

  2. ISSUANCE 2014-12-29: Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

  3. ISSUANCE 2015-11-19: Energy Conservation Program: Test Procedures for Portable Air Conditioners; Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Portable Air Conditioners; Supplemental Notice of Proposed Rulemaking

  4. 2014-10-02 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

  5. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect (OSTI)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  6. Federal Test Procedure Emissions Test Results from Ethanol Variable-Fuel Vehicle Chevrolet Luminas

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data Center Home PageBlender PumpVehiclesThe Heat Is andFederal Test Procedure

  7. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-10-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.

  8. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  9. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  10. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-27

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  13. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-06-20

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  15. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-12-13

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.

  16. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    SciTech Connect (OSTI)

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  17. A Functional Test Procedure for the improved commissioning of a VAV system 

    E-Print Network [OSTI]

    Andre, P.; Lacote, P.; Aparecida Silva, C.; Hannay, J.; Lebrun, J.

    2004-01-01

    In the context of the IEA40 research project, a specification of a “Functional Test Procedure” was progressively developed using the CA-MET building in Namur as real size test bench for the application and validation of the procedure. The target...

  18. AVTA: Oil Bypass Filter Specifications and Test Procedures

    Broader source: Energy.gov [DOE]

    PuraDYN Oil Bypass Filtration System Evaluation Test Plan methodology is used in the testing of all oil bypass filters on the buses at the Idaho National Laboratory.

  19. In-Plane Conductivity Testing Procedures and Results

    Broader source: Energy.gov [DOE]

    This presentation on conductivity testing was given at the High Temperature Membrane Working Group Meeting in May 2007.

  20. NBSBR 84-2867 Test Procedures for Rating

    E-Print Network [OSTI]

    Oak Ridge National Laboratory

    the heating mode. Both air-source and ground water source absorption heat pumps are considered, as well as air, air conditioners, and heat pump units. Key words: Central air conditioners; central heating equipment; heat pumps; heating seasonal performance; cooling seasonal performance; rating procedure; seasonal cost

  1. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect (OSTI)

    Snyder, Isabelle B

    2014-01-01

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  2. Test Procedures for Building Energy Simulation Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCEDInstallers/ContractorsPhotovoltaics »TanklessResearchEnergy Test Methods StandingTest

  3. 2014-04-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule regarding test procedures for residential refrigerators and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014.

  4. 2014-02-21 Issuance: Test Procedure for Commercial Water Heating Equipment; Request for Information

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register request for information regarding test procedures for commercial water heating equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency (February 21, 2014).

  5. Topic Policy/Procedur Change Alcohol and Controlled Substance Testing (CDL) Policy None

    E-Print Network [OSTI]

    Stuart, Steven J.

    Topic Policy/Procedur Change Alcohol and Controlled Substance Testing (CDL) Policy None Applicant Selection --- Selection of Non- --Academic Employees Policy Added clarification: This policy Resources Award Program Policy Updated links to forms and related documents. For approvals, require

  6. 2014-02-07 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register request for information regarding test procedures for commercial packaged boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 7, 2014.

  7. Gas characterization system 241-AN-105 field acceptance test procedure

    SciTech Connect (OSTI)

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AN-105. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  8. Gas characterization system 241-AW-101 field acceptance test procedure

    SciTech Connect (OSTI)

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AW-101. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  9. Development and testing of a standard procedure for determining the viscous properties of crosslinked fracture fluids 

    E-Print Network [OSTI]

    Worlow, David Wayne

    1987-01-01

    treatment. The application of' the published data to fracture design assumes that the power law model is applicable for all shear rates. A testing procedure has been developed which adequately models the shear and temperature history of a typical... fracture treatment. The data required to calculate the power law parameters are obtained at the shear rates expected in the i'racture during a tr eatment. This testing procedure has been designed i' or use with a Farm Model 50C Rotational Viscometer...

  10. Fan System Assessment- End User Training

    Office of Energy Efficiency and Renewable Energy (EERE)

    Optimizing industrial fan systems can take on many forms, but any fan optimization project must meet the needs of the process. This self-paced workshop highlights the benefits of fan system...

  11. Development of an Outdoor Concentrating Photovoltaic Module Testbed, Module Handling and Testing Procedures, and Initial Energy Production Results

    SciTech Connect (OSTI)

    Muller, M.

    2009-09-01

    This report addresses the various aspects of setting up a CPV testbed and procedures for handling and testing CPV modules.

  12. Apparatus and Experimental Procedures to Test Crystal Collimation

    E-Print Network [OSTI]

    Montesano, S

    2012-01-01

    UA9 is an experimental setup operated in the CERN-SPS in view of investigating the feasibility of halo collimation assisted by bent crystals. The test collimation system is composed of one crystal acting as primary halo deflector in the horizontal plane and an absorber. Different crystals are tested in turn using two-arm goniometers with an angular reproducibility of better than 10 microrad. The performance of the system is assessed through the study of the secondary and tertiary halo in critical areas, by using standard machine instrumentation and few customized equipments. The alignment of the crystal is verified by measuring the loss rate close to the crystal position. The collimation efficiency is computed by intercepting the deflected halo with a massive collimator or with an imaging device installed into a Roman Pot. The leakage of the system is evaluated in the dispersion suppressor by means of movable aperture restrictions. In this contribution the setup and the experimental methods in use are revisit...

  13. Project B610 process control configuration acceptance test procedure

    SciTech Connect (OSTI)

    Silvan, G.R.

    1994-09-20

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator`s console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A.

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-07-25

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.

  15. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    SciTech Connect (OSTI)

    KOCH, M.R.

    1999-11-09

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid.

  16. Performance of VAV Parallel Fan Powered Terminal Units: Experimental Results and Models 

    E-Print Network [OSTI]

    Furr, J.; O'Neal, D.; Davis, M.; Bryant, J.; Cramlet, A.

    2008-01-01

    to develop empirical models of airflow, power, and leakage of both parallel and series fan power terminal units. These models are suitable for use in annual energy use models of variable air volume systems in commer- cial buildings. This paper provides a... was the development of empirical models of power and airflow output for parallel and series fan powered terminal units at typical operating pres- sures. An experimental setup was developed and used to test fan powered terminal units from three manufacturers...

  17. Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions | National NuclearProbingProbing metal2 ProblemProcedures

  18. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-03-29

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  19. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  20. Regret Testing: A Simple Payoff-Based Procedure for Learning Nash Equilibrium

    E-Print Network [OSTI]

    George, Edward I.

    Regret Testing: A Simple Payoff-Based Procedure for Learning Nash Equilibrium DEAN P. FOSTER aspiration learning models, whose period-by- period behavior comes arbitrarily close to Nash equilibrium employ a rule from this class their period-by-period strategic behavior approximates Nash equilibrium

  1. Cost effective combined axial fan and throttling valve control of ventilation rate

    E-Print Network [OSTI]

    Sengun, Mehmet Haluk

    Cost effective combined axial fan and throttling valve control of ventilation rate C.J. Taylor 1 P. In partic- ular, it develops a unique fan and throttling valve control system for a 22m3 test chamber, the throttling valve is employed to restrict airflow at the outlet, so generating a higher static pressure differ

  2. Operability test procedure for rotary mode core sampling system {number_sign}4

    SciTech Connect (OSTI)

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 4. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 4 will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  3. Operability test procedure for rotary mode core sampling system {number_sign}3

    SciTech Connect (OSTI)

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 3. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 3, will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  4. Double Ducted Fan (DDF) as a Novel Ducted Fan Inlet Lip Separation Control Device

    E-Print Network [OSTI]

    Camci, Cengiz

    Double Ducted Fan (DDF) as a Novel Ducted Fan Inlet Lip Separation Control Device Ali Akturk computational study of a novel ducted fan inlet flow conditioning concept that will significantly improve the performance and controllability of VTOL UAVs and many other ducted fan based systems. The new concept

  5. 2014-11-24 Issuance: Test Procedures for Conventional Cooking Products; Supplementary Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register Supplementary Notice of Proposed Rulemaking regarding test procedures for conventional cooking products, as issued by the Deputy Asisstant Secretary for Energy Efficiency. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  6. 2014-05-05 Issuance: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for dehumidifiers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 2, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  7. 2015-01-28 Issuance: Test Procedure for Fluorescent Lamp Ballasts; Final Rule Correction

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 28, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  8. ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures for

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservation Standards and Test Procedures for FluorescentCommercial

  9. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservation Standards and Test Procedures forDehumidifiers, Final Rule

  10. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservation Standards and Test Procedures forDehumidifiers, Final

  11. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservation Standards and Test Procedures forDehumidifiers,

  12. ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures for

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservation Standards and Test ProceduresDefinitions andCentral Air

  13. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergy HeadquartersFuelBConservation Standards and Test ProceduresDefinitions andCentralof

  14. Field tests and new design procedure for laterally loaded drilled shafts in clay 

    E-Print Network [OSTI]

    Bierschwale, Mark W.

    1980-01-01

    , and develop a new design procedure for drilled shafts supporting precast panel retaining walls. FIELD LOAD TESTS The prediction of the behavior of laterally loaded shafts involves the determination of the shaft-soil interaction. One approach... 4ft to l3 ft 5 -very stiff red clay(CH) below 5ft I-O zL 128 l30 P IC WA R L I QUI 0 LIMIT CONTENT /o LI Ml T ? + 7 IO 20 30 COHESIVE SHEAR STRENGTH, Cu, 0. 6 0, 8 I 0 I. 2 I, 4 I, 6 I. 8 ~ Unconfined Compression Test + Miniature Vane...

  15. Amazon Fan biomarker evidence against the Pleistocene rainforest refuge hypothesis?

    E-Print Network [OSTI]

    Jones, Peter JS

    Drilling Program Leg 155 Site 942 on the Amazon Fan is an ideal location for monitoring palaeoclimatic is constrained between Ŕ31% and Ŕ34%, which is well within the isotopic range occupied by C3 vegetation in the Amazon Basin. This paper provides another test of one of these theories, namely the `Pleistocene tropical

  16. Lagoon Seepage Testing Procedures for Central Facilities Area (CFA) Sewage Lagoons at Idaho National Laboratory Butte County, Idaho April 2014

    SciTech Connect (OSTI)

    Alan Giesbrecht

    2014-05-01

    The lagoon seepage testing procedures are documented herein as required by the Wastewater Rules (IDAPA 58.01.16.493). The Wastewater Rules and Wastewater Reuse Permit LA-000141-03 require that the procedure used for performing a seepage test be approved by IDEQ prior to conducting the seepage test. The procedures described herein are based on a seepage testing plan that was developed by J-U-B ENGINEERS, Inc. (J-U-B) and has been accepted by several IDEQ offices for lagoons in Idaho.

  17. Save Energy with Axial Fans 

    E-Print Network [OSTI]

    Monroe, R. C.

    1981-01-01

    point on horsepower, how and when are velocity recovery stacks effective, the effect of varying fan speed to improve efficiency, and tip clearance effects. The areas of interest to dry tower (air cooled heat exchanger) users would be the effect of inlet...

  18. 2014-05-05 Issuance: Test Procedure for Portable Air Conditioners; Notice of Data Availability

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of data availabilty regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  19. New test procedure evaluates quality and accuracy of energy analysis tools for the residential building retrofit market.

    E-Print Network [OSTI]

    New test procedure evaluates quality and accuracy of energy analysis tools for the residential the Building Energy Simulation Test for Existing Homes (BESTEST-EX), a method for diagnosing and correcting physics and utility bill calibration test cases, which soft- ware developers can use to compare

  20. Fan Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14, 20111,FYDepartment of5 November 2015Fan

  1. ISSUANCE 2015-12-04: Energy Conservation Standards and Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information

    Broader source: Energy.gov [DOE]

    Energy Conservation Standards and Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information

  2. ISSUANCE 2015-05-12: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters

  3. ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

  4. ISSUANCE 2014-12-23: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

  5. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

  6. Developing standard performance testing procedures for material control and accounting components at a site

    SciTech Connect (OSTI)

    Scherer, Carolynn P; Bushlya, Anatoly V; Efimenko, Vladimir F; Ilyanstev, Anatoly; Regoushevsky, Victor I

    2010-01-01

    The condition of a nuclear material control and accountability system (MC&A) and its individual components, as with any system combining technical elements and documentation, may be characterized through an aggregate of values for the various parameters that determine the system's ability to perform. The MC&A system's status may be functioning effectively, marginally or not functioning based on a summary of the values of the individual parameters. This work included a review of the following subsystems, MC&A and Detecting Material Losses, and their respective elements for the material control and accountability system: (a) Elements of the MC&A Subsystem - Information subsystem (Accountancy/Inventory), Measurement subsystem, Nuclear Material Access subsystem, including tamper-indicating device (TID) program, and Automated Information-gathering subsystem; (b) Elements for Detecting Nuclear Material Loses Subsystem - Inventory Differences, Shipper/receiver Differences, Confirmatory Measurements and differences with accounting data, and TID or Seal Violations. In order to detect the absence or loss of nuclear material there must be appropriate interactions among the elements and their respective subsystems from the list above. Additionally this work includes a review of regulatory requirements for the MC&A system component characteristics and criteria that support the evaluation of the performance of the listed components. The listed components had performance testing algorithms and procedures developed that took into consideration the regulatory criteria. The developed MC&A performance-testing procedures were the basis for a Guide for MC&A Performance Testing at the material balance areas (MBAs) of State Scientific Center of the Russian Federation - Institute for Physics and Power Engineering (SSC RF-IPPE).

  7. Grid Interconnection and Performance Testing Procedures for Vehicle-To-Grid (V2G) Power Electronics: Preprint

    SciTech Connect (OSTI)

    Kramer, W.; Chakraborty, S.; Kroposki, B.; Hoke, A.; Martin, G.; Markel, T.

    2012-03-01

    Bidirectional power electronics can add vehicle-to-grid (V2G) capability in a plug-in vehicle, which then allows the vehicle to operate as a distributed resource (DR). The uniqueness of the battery-based V2G power electronics requires a test procedure that will not only maintain IEEE interconnection standards, but can also evaluate the electrical performance of the vehicle working as a DR. The objective of this paper is to discuss a recently published NREL technical report that provides interim test procedures for V2G vehicles for their integration into the electrical distribution systems and for their performance in terms of continuous output power, efficiency, and losses. Additionally, some other test procedures are discussed that are applicable to a V2G vehicle that desires to provide power reserve functions. A few sample test results are provided based on testing of prototype V2G vehicles at NREL.

  8. Ceiling Fan | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION JEnvironmentalBowerbank,CammackFLIR Jump to:RAPIDCavallo Energy JumpCeiling Fan Jump to:

  9. Development of a High Efficiency Ceiling Fan 

    E-Print Network [OSTI]

    Parker, D. S.; Callahan, M. P.; Sonne, J. K.; Su, G. H.; Hibbs, B. D.

    2000-01-01

    The potential of ceiling fans to improve comfort during the cooling season is well documented (Rohles et al.. 1983; Fairey et al.. 1986). There are at least two cases: In the first where air conditioning is unavailable, adding ceiling fans may...

  10. Cooling with a Whole House Fan | Department of Energy

    Office of Environmental Management (EM)

    circulating fans provide acceptable summer comfort for many families, even in hot weather. In addition to whole house fans, the ducts of your central heating and cooling...

  11. A COMPUTATIONAL AND EXPERIMENTAL ANALYSIS OF A DUCTED FAN USED IN VTOL UAV SYSTEMS

    E-Print Network [OSTI]

    Camci, Cengiz

    diameter ducted fan. They have concentrated on the performance of ducted fan VTOL vehicles in crosswind

  12. Fan-fold shielded electrical leads

    DOE Patents [OSTI]

    Rohatgi, R.R.; Cowan, T.E.

    1996-06-11

    Disclosed are fan-folded electrical leads made from copper cladded Kapton, for example, with the copper cladding on one side serving as a ground plane and the copper cladding on the other side being etched to form the leads. The Kapton is fan folded with the leads located at the bottom of the fan-folds. Electrical connections are made by partially opening the folds of the fan and soldering, for example, the connections directly to the ground plane and/or the lead. The fan folded arrangement produces a number of advantages, such as electrically shielding the leads from the environment, is totally non-magnetic, and has a very low thermal conductivity, while being easy to fabricate. 3 figs.

  13. Fan-fold shielded electrical leads

    DOE Patents [OSTI]

    Rohatgi, Rajeev R. (Mountain View, CA); Cowan, Thomas E. (Livermore, CA)

    1996-01-01

    Fan-folded electrical leads made from copper cladded Kapton, for example, with the copper cladding on one side serving as a ground plane and the copper cladding on the other side being etched to form the leads. The Kapton is fan folded with the leads located at the bottom of the fan-folds. Electrical connections are made by partially opening the folds of the fan and soldering, for example, the connections directly to the ground plane and/or the lead. The fan folded arrangement produces a number of advantages, such as electrically shielding the leads from the environment, is totally non-magnetic, and has a very low thermal conductivity, while being easy to fabricate.

  14. Evaluation of Retrofit Variable-Speed Furnace Fan Motors

    SciTech Connect (OSTI)

    Aldrich, R.; Williamson, J.

    2014-01-01

    In conjunction with the New York State Energy Research and Development Authority (NYSERDA) and Proctor Engineering Group, Ltd. (PEG), the Consortium for Advanced Residential Buildings (CARB) has evaluated the Concept 3 (tm) replacement motors for residential furnaces. These brushless, permanent magnet (BPM) motors can use much less electricity than their PSC (permanent split capacitor) predecessors. This evaluation focuses on existing homes in the heating-dominated climate of upstate New York with the goals of characterizing field performance and cost-effectiveness. The results of this study are intended to be useful to home performance contractors, HVAC contractors, and home efficiency program stakeholders. The project includes eight homes in and near Syracuse, NY. Tests and monitoring was performed both before and after fan motors were replaced. Average fan power reductions were approximately 126 Watts during heating and 220 Watts during cooling operation. Over the course of entire heating and cooling seasons, these translated into average electric energy savings of 163 kWh. Average cost savings were $20 per year. Homes where the fan was used outside of heating and cooling mode saved an additional $42 per year on average. Results indicate that BPM replacement motors will be most cost-effective in HVAC systems with longer run times and relatively low duct static pressures. More dramatic savings are possible if occupants use the fan-only setting when there is no thermal load. There are millions of cold-climate, U.S. homes that meet these criteria, but the savings in most homes tested in this study were modest.

  15. Test procedure for use of the shear vane in tanks 103-SY, 103-AN, and 103-AW

    SciTech Connect (OSTI)

    LeClair, M.D.; Waters, E.

    1995-01-01

    This is a record copy of a test procedure for application of the full-scale shear vane to underground waste tanks at Hanford. The introduction of the report provides background information on the development and proof-testing of the shear vane, as well as information about its current location. The document was originally prepared in 1988, and the work as shelved temporarily for lack of funds. Activities to utilize the shear vane will be expedited by use of this information.

  16. What Problems can be Encountered when Efficiency Upgrades are Made to Fans and what Should the Approach be to Address Those Problems 

    E-Print Network [OSTI]

    Martin, V.

    2015-01-01

    : What Problems May be encountered? What Approach Best Addresses Them? Presented by Vern Martin, P.Eng. FLOWCARE Engineering Inc. IETC 2015 June 2 - 4 New Orleans, LA ESL-IE-15-06-39 Proceedings of the Thrity-Seventh Industrial Energy Technology... Conference New Orleans, LA. June 2-4, 2015 Site performance testing to rigorous standards is required to establish fan efficiency. Causes of Poor Fan Efficiency Issues to investigate: • Was the fan efficiency overstated? • Was there a better choice...

  17. Fans for Cooling | Department of Energy

    Energy Savers [EERE]

    4F with no reduction in comfort. In temperate climates, or during moderately hot weather, ceiling fans may allow you to avoid using your air conditioner altogether. Install a...

  18. ISSUANCE 2015-06-25: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Residential and Commercial Water Heaters; Correction

    Broader source: Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Residential and Commercial Water Heaters; Correction

  19. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

    Broader source: Energy.gov [DOE]

    Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

  20. Performance Assessment of Photovoltaic Attic Ventilator Fans

    Broader source: Energy.gov [DOE]

    A case study of photovoltaic attic ventilator fans was conducted on an occupied single family home in Central Florida. Two fans were installed at mid-summer in an instrumented home where attic air temperature, meteorological conditions and space cooling electric power were measured. The home already had an attic radiant barrier, but still experienced attic air temperatures in excess of 130oF.

  1. Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications

    SciTech Connect (OSTI)

    Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

    2011-06-01

    The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

  2. The design and testing of a procedure to locate fresh submarine groundwater discharge in Cyprus

    E-Print Network [OSTI]

    Olesnavage, Kathryn M

    2012-01-01

    The aim of this collaborative project between Massachusetts Institute of Technology (MIT) and Cyprus Institute was to develop an experimental procedure for identifying fresh submarine groundwater discharge (SGD) in Cyprus. ...

  3. Procedures for Reducing the Size of Coverage-based Test Sets A. Je erson O utt

    E-Print Network [OSTI]

    Offutt, Jeff

    250 21515 Ridgetop Circle Sterling, VA 20166 USA Phone: 703.404.9293 Fax: 703.404.9295 Email: jmvoas on a set of test cases. Test engineers measure the extent to which a criterion is satis ed in terms

  4. Section 8.1 Hypotheses and Test Procedures June 1, 2015 1 8 Tests of Hypotheses Based on a

    E-Print Network [OSTI]

    Arnold, Elizabeth A.

    that peanut oil causes colon cancer. Example: State the hypotheses for testing the claim that peanut oil and in medical terminology. Describe the Type II error in regular English and in medical terminology

  5. Fan-less long range alpha detector

    DOE Patents [OSTI]

    MacArthur, D.W.; Bounds, J.A.

    1994-05-10

    A fan-less long range alpha detector is disclosed which operates by using an electrical field between a signal plane and the surface or substance to be monitored for air ions created by collisions with alpha radiation. Without a fan, the detector can operate without the possibility of spreading dust and potential contamination into the atmosphere. A guard plane between the signal plane and the electrically conductive enclosure and maintained at the same voltage as the signal plane, reduces leakage currents. The detector can easily monitor soil, or other solid or liquid surfaces. 2 figures.

  6. Cooling efficiency of a brushless direct current stand fan

    E-Print Network [OSTI]

    Yang, Bin; Schiavon, Stefano; Sekhar, Chandra; Cheong, David; Tham, Kwok Wai; Nazaroff, William W

    2015-01-01

    3.1.2. Cooling Fan Efficiency (CFE) index Fig. 5 displaysH, Zhai Y. Enabling energy-efficient approaches to thermalIntroduction of a cooling-fan efficiency index. HVAC&R Res [

  7. Cooling efficiency of a brushless direct current stand fan

    E-Print Network [OSTI]

    Yang, Bin; Schiavon, Stefano; Sekhar, Chandra; Cheong, David; Tham, Kwok Wai; Nazaroff, William W

    2015-01-01

    eq (°C) Front Side Fig. 4. Cooling effect comparison betweenmanikin distance. 3.1.2. Cooling Fan Efficiency (CFE) indexdevices [41-42]. Local cooling for front and side fan-

  8. Healthcare Energy: Spotlight on Fans and Pumps | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fans and Pumps Healthcare Energy: Spotlight on Fans and Pumps Chilled water pumps at a central plant. Image by Warren Gretz, NREL06196 Chilled water pumps at a central plant....

  9. Ultra-short nacelles for low fan pressure ratio propulsors

    E-Print Network [OSTI]

    Peters, Andreas, Ph. D. Massachusetts Institute of Technology

    2014-01-01

    This thesis addresses the uncharted inlet and nacelle design space for low pressure ratio fans for advanced aeroengines. A key feature in low fan pressure ratio (FPR) propulsors with short inlets and nacelles is the increased ...

  10. Solar Decathlon 2015: Energy.gov Fan Favorite Poll Results |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Decathlon 2015: Energy.gov Fan Favorite Poll Results Solar Decathlon 2015: Energy.gov Fan Favorite Poll Results October 22, 2015 - 10:10am Addthis West Virginia University...

  11. High Efficiency Fans and High Efficiency Electrical Motors 

    E-Print Network [OSTI]

    Breedlove, C. W.

    1989-01-01

    operates from 800 hours to 1500 hours per year or 15% of the year. Sixty percent of the connected horsepower is operating pneumatic air fans. These pneumatic fans transport the seed cotton, cotton lint, cottonseed and cotton trash throughout... efficiency will be consistent and ongoing. Since pneumat cs use 60% of the total power consumed in a cotton gin it seemed the most likely pace to improve efficiency. Each fan's sys em was redesigned and engineered. Not on y were old inefficient fans...

  12. DOE Publishes Request for Information for Ceiling Fans

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a request for information regarding energy conservation standards for ceiling fans.

  13. Development of In-Situ Fan Curve Measurement with One Airflow Measurement 

    E-Print Network [OSTI]

    Liu, G.; Joo, I. S.; Song, L.; Liu, M.

    2003-01-01

    Fan airflow is the key parameter for air volume tracking control in variable air volume systems. One of the airflow measurement methods is to determine airflow using the fan speed, fan head, and fan curve. Both fan speed and fan head can be measured...

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect (OSTI)

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  16. DOUBLE DUCTED FAN (DDF) Cengiz Camci and Ali Akturk

    E-Print Network [OSTI]

    Camci, Cengiz

    DOUBLE DUCTED FAN (DDF) By Cengiz Camci and Ali Akturk A technology description document a novel ducted fan inlet flow conditioning concept that will significantly improve the performance" and many other ducted fan based systems. The new concept that will significantly reduce the inlet lip

  17. The Spacing of Ceiling Fans for Human Comfort in Warm Temperature Conditions 

    E-Print Network [OSTI]

    Spain, S.

    1987-01-01

    FOR HUMAN COMFORT IN WARM TEMPERATURE CONDITIONS Syd Spain, Ph.D. Research Specialist CRS Sirrine, Inc. Houston, Tx ABSTRACT Airspeed tests of a commerci a1 1 y popular 52 in. ceiling fan operating at a low speed of 155 fpm provided sufficient...

  18. Evaluation of Retrofit Variable-Speed Furnace Fan Motors

    SciTech Connect (OSTI)

    Aldrich, R.; Williamson, J.

    2014-01-01

    In conjunction with the New York State Energy Research and Development Authority (NYSERDA) and Proctor Engineering Group, Ltd. (PEG), the Consortium for Advanced Residential Buildings (CARB) has evaluated the Concept 3™ replacement motors for residential furnaces. These brushless, permanent magnet (BPM) motors can use much less electricity than their PSC (permanent split capacitor) predecessors. This evaluation focuses on existing homes in the heating-dominated climate of upstate New York with the goals of characterizing field performance and cost effectiveness. The project includes eight homes in and near Syracuse, NY. Tests and monitoring was performed both before and after fan motors were replaced. Results indicate that BPM replacement motors will be most cost effective in HVAC systems with longer run times and relatively low duct static pressures. More dramatic savings are possible if occupants use the fan-only setting when there is no thermal load. There are millions of cold-climate, U.S. homes that meet these criteria, but the savings in most homes tested in this study were modest.

  19. Adjustable Speed- A Tool for Saving Energy Losses in Pumps, Fans, Fans, Blowers and Compressors 

    E-Print Network [OSTI]

    Hickok, H. N.

    1985-01-01

    Petroleum and chemical plants of today are effectively cutting energy losses in their plants thermally, electrically, and mechanically in their process equipment. In rotating process equipment such as pumps, fans, compressors, and blowers, much...

  20. An Updated Procedure for Tare and Interference Wind Tunnel Testing of Strut-Mounted Models 

    E-Print Network [OSTI]

    Kutz, Douglas M

    2014-05-02

    Despite advances in modern computing and simulation, wind tunnel testing remains the most trusted method for determining aerodynamic vehicle behavior. Corrections are applied to accurately obtain results representative of free-air performance due...

  1. 2014-06-27 Issuance: Test Procedures for Residential and Commercial...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document. 2014-06-27 Test...

  2. 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice...

    Energy Savers [EERE]

    Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document. 2014-05-08 Test...

  3. 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge...

    Energy Savers [EERE]

    Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document. 2014-05-05 Test...

  4. 2014-07-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule Correction

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for refrigerators, refrigerator-freezers, and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on July 10, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  5. 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register Supplemental Notice of Proposed Rulemaking regarding Test Procedures for Integrated Light-Emitting Diode Lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 18, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  6. 2014-03-31 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information, Reopening of the Comment Period

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice reopening the comment period for the request for information regarding the commercial packaged boiler test procedure rulemaking, as issued by the Deputy Assistant Secretary for Energy Efficiency on March 31, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  7. 2014-03-06 Issuance: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps; Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for packaged terminal air conditioners and packaged terminal heat pumps, as issued by the Deputy Assistant Secretary on March 6, 2014.

  8. Base program interim phase test procedure - Coherent Laser Vision System (CLVS). Final report, September 27, 1994--January 30, 1997

    SciTech Connect (OSTI)

    1997-05-01

    The purpose of the CLVS research project is to develop a prototype fiber-optic based Coherent Laser Vision System suitable for DOE`s EM Robotics program. The system provides three-dimensional (3D) vision for monitoring situations in which it is necessary to update geometrics on the order of once per second. The CLVS project plan required implementation in two phases of the contract, a Base Contract and a continuance option. This is the Test Procedure and test/demonstration results presenting a proof-of-concept for a system providing three-dimensional (3D) vision with the performance capability required to update geometrics on the order of once per second.

  9. Ris-R-1483(EN) Testing procedure for the single fiber

    E-Print Network [OSTI]

    #12;1 Introduction One of the primary objectives in the field of fiber-polymer composites fragmentation test as conducted at the materials research department (AFM) at Risř. The equipment and specimen is the control of the degree of adhesion between the usually more rigid fiber and the relatively ductile polymer

  10. Acceptance test procedure for removal of CS1K circuit switcher block and trip schemes

    SciTech Connect (OSTI)

    HACHE, J.M.

    1999-08-25

    This supporting document provides a detailed process to test the functions of the circuit switcher, protective relays, alarms, SCADA and 125VDC control logic of 115kV and 13.8kV systems at B3S4 substation following the removal of trip and blocking schemes to Transformer No.1 Circuit Switcher B594.

  11. BESTEST: Test Procedures ÂŤBuilding Energy SimulationÂŽ Tools

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics AndBerylliumDepartmentResolution of Significant36RA-L-11-03Ron.Judkoff@nrel.gov BESTEST: Test

  12. Fan System Assessment Tool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14, 20111,FYDepartment of5 November 2015Fan System

  13. New Whole-House Solutions Case Study: Evaluating Through-Wall Air Transfer Fans, Pittsburgh, Pennsylvania

    SciTech Connect (OSTI)

    2014-10-01

    In this project, Building America team IBACOS performed field testing in a new construction unoccupied test house in Pittsburgh, Pennsylvania, to evaluate heating, ventilating, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. The team evaluated a market-available through-wall air transfer fan system that provides air to the bedrooms.The relative ability of this system was considered with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability.

  14. A Discussion of Procedures and Equipment for the Comprehensive Test Ban Treaty On-Site Inspection Environmental Sampling and Analysis

    SciTech Connect (OSTI)

    Wogman, Ned A.; Milbrath, Brian D.; Payne, Rosara F.; Seifert, Carolyn E.; Friese, Judah I.; Miley, Harry S.; Bowyer, Ted W.; Hanlen, Richard C.; Onishi, Yasuo; Hayes, James C.; Wigmosta, Mark S.

    2011-02-01

    This paper is intended to serve as a scientific basis to start discussions of the available environmental sampling techniques and equipment that have been used in the past that could be considered for use within the context of the Comprehensive Nuclear-Test-Ban Treaty (CTBT) on-site inspections (OSI). This work contains information on the techniques, equipment, costs, and some operational procedures associated with environmental sampling that have actually been used in the past by the United States for the detection of nuclear explosions. This paper also includes a discussion of issues, recommendations, and questions needing further study within the context of the sampling and analysis of aquatic materials, atmospheric gases, atmospheric particulates, vegetation, sediments and soils, fauna, and drill-back materials.

  15. Building Pressure Control in VAV System with Relief Air Fan 

    E-Print Network [OSTI]

    Pang, X.; Liu, M.; Zheng, B.

    2005-01-01

    Building Pressure Control in VAV Systems with Relief Air Fan Xiufeng Pang, Mingsheng Liu, PhD, P.E., Bin Zheng University of Nebraska, Lincoln—ESL 1110 So. 67 th St, Omaha, NE, 68182 Abstract Building pressure control is critical... to energy conservation and indoor air quality by preventing excessive infiltration or exfiltration. In the supply and the return/relief fan Air Handling Unit (AHU) system, better space pressurization can be achieved when return/relief fan operates...

  16. Potential Global Benefits of Improved Ceiling Fan Energy Efficiency

    E-Print Network [OSTI]

    Sathaye, Nakul

    2014-01-01

    using genetic algorithm. Energy for Sustainable Development,induced by a room ceiling- fan. Energy and Buildings, 43(8),G. , 2010. Estimating Technical Energy Saving Potential from

  17. Fans for Cooling | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuelsof Energy Services » Program ManagementAct4FacilityFact SheetFall andFans

  18. Experimental Evaluation of Installed Cooking Exhaust Fan Performance

    E-Print Network [OSTI]

    Singer, Brett C.

    2011-01-01

    and  results  for  B6.   Exp Burners RR LF LR RR LF RR RF RFHigh High High Fan (cfm) Burner Fire Btu/hr A- 50 Fan/Plumeand  results  for  D1.   Exp Burners RR LR LF RF RF LR LR RF

  19. Choosing the right boiler air fans at Weston 4

    SciTech Connect (OSTI)

    Spring, N.

    2009-04-15

    When it came to choosing the three 'big' boiler air fans - forced draft, induced draft and primary air, the decision revolved around efficiency. The decision making process for fan selection for the Western 4 supercritical coal-fired plant is described in this article. 3 photos.

  20. Heuristics for Balancing Turbine Fans Samir V. Amiouny

    E-Print Network [OSTI]

    Bartholdi III, John J.

    Reiger, 1986. In some cases, such as in the constructionof hydraulic, steam or gas turbines, fan blades to counteract the residual un- balance. For gas and steam turbines, this is necessary not only when the engineHeuristics for Balancing Turbine Fans Samir V. Amiouny John J. Bartholdi, III John H. Vande Vate

  1. An Innovative Method for Dynamic Characterization of Fan Filter Unit Operation.

    E-Print Network [OSTI]

    Xu, Tengfang

    2006-01-01

    large fan-filter units for cleanroom applications. BuildingFeedback Control in a Cleanroom. ” Building and Environment.Fan filter unit (FFU), cleanroom, energy efficiency, airflow

  2. Method for fabricating fan-fold shielded electrical leads

    DOE Patents [OSTI]

    Rohatgi, R.R.; Cowan, T.E.

    1994-12-27

    Fan-folded electrical leads made from copper cladded Kapton, for example, with the copper cladding on one side serving as a ground plane and the copper cladding on the other side being etched to form the leads. The Kapton is fan folded with the leads located at the bottom of the fan-folds. Electrical connections are made by partially opening the folds of the fan and soldering, for example, the connections directly to the ground plane and/or the lead. The fan folded arrangement produces a number of advantages, such as electrically shielding the leads from the environment, is totally non-magnetic, and has a very low thermal conductivity, while being easy to fabricate. 3 figures.

  3. Costs and benefits of energy efficiency improvements in ceiling fans

    SciTech Connect (OSTI)

    Shah, Nihar; Sathaye, Nakul; Phadke, Amol; Letschert, Virginie

    2013-10-15

    Ceiling fans contribute significantly to residential electricity consumption, especially in developing countries with warm climates. The paper provides analysis of costs and benefits of several options to improve the efficiency of ceiling fans to assess the global potential for electricity savings and green house gas (GHG) emission reductions. Ceiling fan efficiency can be cost-effectively improved by at least 50% using commercially available technology. If these efficiency improvements are implemented in all ceiling fans sold by 2020, 70 terawatt hours per year could be saved and 25 million metric tons of carbon dioxide equivalent (CO2-e) emissions per year could be avoided, globally. We assess how policies and programs such as standards, labels, and financial incentives can be used to accelerate the adoption of efficient ceiling fans in order to realize potential savings.

  4. Method for fabricating fan-fold shielded electrical leads

    DOE Patents [OSTI]

    Rohatgi, Rajeev R. (Mountain View, CA); Cowan, Thomas E. (Livermore, CA)

    1994-01-01

    Fan-folded electrical leads made from copper cladded Kapton, for example, with the copper cladding on one side serving as a ground plane and the copper cladding on the other side being etched to form the leads. The Kapton is fan folded with the leads located at the bottom of the fan-folds. Electrical connections are made by partially opening the folds of the fan and soldering, for example, the connections directly to the ground plane and/or the lead. The fan folded arrangement produces a number of advantages, such as electrically shielding the leads from the environment, is totally non-magnetic, and has a very low thermal conductivity, while being easy to fabricate.

  5. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

  6. Using finite element analysis of retroreflective raised pavement markers to recommend testing procedures for simulating their field performance 

    E-Print Network [OSTI]

    Agrawal, Ravi Prakash

    2006-08-16

    procedures that can better simulate field conditions. This requires identifying critical locations and magnitudes of stresses inside the markers during the tire-marker impacts that happen on roads. The goal of this research was to identify critical magnitudes...

  7. Cooling Tower Energy Conservation Through Hydraulic Fan Drives 

    E-Print Network [OSTI]

    Dickerson, J.

    1991-01-01

    Many companies offer gearboxes, shafts, and couplings for cooling tower fan drives, with little or no innovation. These companies have traditionally been purchased with an emphasis on cost and not "Return on Investment!" In the past, when energy...

  8. Evolution of high-redshift quasars Xiaohui Fan

    E-Print Network [OSTI]

    Colorado at Boulder, University of

    Evolution of high-redshift quasars Xiaohui Fan Steward Observatory, The University of Arizona redshift quasars, including the evolution of quasar density and luminosity function, the evolution. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 666 3. Evolution of quasar density and luminosity function at high

  9. New Energy Efficiency Standards for Furnace Fans to Reduce Carbon...

    Office of Environmental Management (EM)

    by at least 3 billion metric tons in total by 2030, equal to more than a year's carbon pollution from the entire U.S. electricity system. Furnace fans are used to circulate air...

  10. Cooling with a Whole House Fan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    families, even in hot weather. In addition to whole house fans, the ducts of your central heating and cooling system can be modified to provide whole house cooling. How Whole House...

  11. Modeling and ecodesigning crossflow ventilation fans with Mathematica

    E-Print Network [OSTI]

    Argentini, Gianluca

    2010-01-01

    The efficiency of a simple model of crossflow fan is maximized when the geometry depends on a design parameter. The flow field is numerically computed using a Galerkin method for solving a Poisson partial differential equation.

  12. Building America Case Study: Evaluating Through-Wall Air Transfer Fans, Pittsburgh, Pennsylvania (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-10-01

    In this project, Building America team IBACOS performed field testing in a new construction unoccupied test house in Pittsburgh, Pennsylvania to evaluate heating, ventilating, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. Four air-based HVAC distribution systems were assessed:-a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, a system with transfer fans to the bedrooms, and a system with no ductwork to the bedrooms. The relative ability of each system was considered with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability, respectively.

  13. Best Practice for Energy Efficient Cleanrooms: Fan-FilterUnits

    SciTech Connect (OSTI)

    Xu, Tengfang

    2005-06-15

    The HVAC systems in cleanrooms may use 50 percent or more of the total cleanroom energy use. Fan energy use accounts for a significant portion (e.g., over 50%) of the HVAC energy use in cleanrooms such as ISO Classes 3, 4, or 5. Three types of air-handling systems for recirculating airflows are commonly used in cleanrooms: (1) fan-tower systems with pressurized plenum, (2) ducted HEPA systems with distributed-fans, and (3) systems with fan-filter units. Because energy efficiency of the recirculation systems could vary significantly from system type to system type, optimizing aerodynamic performance in air recirculation systems appears to be a useful approach to improve energy efficiency in cleanrooms. Providing optimal airflows through careful planning, design and operation, including air change rate, airflow uniformity, and airflow speed, is important for controlling particle contamination in cleanrooms. In practice, the use of fan-filter units (FFUs) in the air-handling system is becoming more and more popular because of this type of system may offer a number of advantages. Often modular and portable than traditional recirculation airflow systems, FFUs are easier to install, and can be easily controlled and monitored to maintain filtration performance. Energy efficiency of air handling systems using fan-filter units can, however, be lower than their counterparts and may vary significantly from system to system because of the difference in energy performance, airflow paths, and the operating conditions of FFUs.

  14. Ceiling Fan and Ceiling Fan Light Kit use in the U.S. Results of a Survey on Amazon Mechanical Turk

    E-Print Network [OSTI]

    Kantner, Colleen L.S.

    2013-01-01

    air conditioning .31   3.7   Impact of ceiling fans on air conditioningowners increased the air conditioning thermostat temperature

  15. The evaluation of micro-surfacing mixture design procedures and the effects of material variation on the test responses 

    E-Print Network [OSTI]

    Andrews, Edward Mensah

    1994-01-01

    This study examines statistically the repeatability of the International Slurry Surfacing Association (ISSA) mixture design tests by estimating the h and k consistency statistics for the test results obtained. An idea of ...

  16. Blue fan palm distribution and seed removal patterns in three desert oases of northern Baja California, Mexico

    E-Print Network [OSTI]

    Wehncke, Elisabet V.; López-Medellín, Xavier; Ezcurra, Exequiel

    2010-01-01

    DOI 10.1007/s11258-009-9682-4 Blue fan palm distribution anddistribution patterns of the blue fan palm, Brahea armata,evaluating (i) the levels of blue fan palm seed removal by

  17. Performance and Stability Analysis of a Shrouded-Fan UAV

    E-Print Network [OSTI]

    de Divitiis, Nicola

    2009-01-01

    This paper deals with the estimation of the performance and stability for a shrouded-fan unmanned rotorcraft whose mission profile also prescribes the flight in ground effect. The not so simple estimation of the aerodynamic coefficients and of the thrust in the various situations makes the performance calculation and the stability analysis difficult tasks. This is due to the strong interaction between the fan flow and shroud that causes quite different flow structures about the airframe depending on flight conditions. A further difficulty is related to the ground effect which produces substantial modifications in the rotor thrust and aerodynamic coefficients. To evaluate performance and stability, two models have been developed. One determines the aerodynamic coefficients of the shroud, whereas the other one calculates thrust and moment of the rotors system. Both models take into account the mutual interference between fan flow and fuselage and ground effect. Performance and stability are then discussed with ...

  18. Laboratory evaluation of fan/filter units' aerodynamic and energy performance

    SciTech Connect (OSTI)

    Xu, Tengfang; Jeng, Ming-Shan

    2004-07-27

    The paper discusses the benefits of having a consistent testing method to characterize aerodynamic and energy performance of FFUs. It presents evaluation methods of laboratory-measured performance of ten relatively new, 1220 mm x 610 mm (or 4 ft x 2 ft) fan-filter units (FFUs), and includes results of a set of relevant metrics such as energy performance indices (EPI) based upon the sample FFUs tested. This paper concludes that there are variations in FFUs' performance, and that using a consistent testing and evaluation method can generate compatible and comparable FFU performance information. The paper also suggests that benefits and opportunities exist for our method of testing FFU energy performance to be integrated in future recommended practices.

  19. Amateur experts: International fan labor in Swedish independent music

    E-Print Network [OSTI]

    Baym, Nancy K.; Burnett, Robert

    2009-09-01

    , and comprehensibility of Swedish indie are buttressed by many others fans’ minimalist practices. Amateur Experts -- 4 Together, these fans serve as expert filters as they sift, sort, label, translate, rate and annotate a large, disorganized, and geographically... one’: It’s A Trap.” The site receives as many as 4,000 daily hits and as many as 30,000 unique visitors a month, many from within Scandinavia. Says Roig: No one else does what I do or even comes close, so I seem to have positioned myself as a vital...

  20. DOE Publishes Notice of Proposed Rulemaking for Residential Furnace Fans Energy Conservation Standards

    Broader source: Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding energy conservation standards for residential furnace fans.

  1. Flexibility of Commercial Building HVAC Fan as Ancillary Service for Smart Grid

    E-Print Network [OSTI]

    Maasoumy, Mehdi

    2013-01-01

    Efficient Building Control Systems, Smart Grid and AircraftCommercial Building HVAC Fan as Ancillary Service for Smart

  2. Cellular Responses in Sea Fan Corals: Granular Amoebocytes React to Pathogen and Climate Stressors

    E-Print Network [OSTI]

    Harvell, Catherine Drew

    Cellular Responses in Sea Fan Corals: Granular Amoebocytes React to Pathogen and Climate Stressors amoebocyte responses indicate that sea fan corals use cellular defenses to combat fungal infection SF, Peters EC, Harvell CD (2008) Cellular Responses in Sea Fan Corals: Granular Amoebocytes React

  3. A Snapshot of Public Web Services Jianchun Fan & Subbarao Kambhampati

    E-Print Network [OSTI]

    Kambhampati, Subbarao

    A Snapshot of Public Web Services Jianchun Fan & Subbarao Kambhampati Department of Computer}@asu.edu Abstract Web Service Technology has been developing rapidly as it provides a flexible application-to-application interaction mechanism. Several ongoing research efforts focus on various aspects of web service technology

  4. Measured Natural Cooling Enhancement of a While House Fan 

    E-Print Network [OSTI]

    Parker, D. S.

    1994-01-01

    An experimental study was carried out in the summer of 1991 to investigate the natural cooling potential of use of a whole house fan in Central Florida's hot and humid climate. The residential building, in Cocoa Beach, FL, is typical of much...

  5. Cosmogenic 10 Cl geochronology of offset alluvial fans

    E-Print Network [OSTI]

    Frankel, Kurt L.

    Cosmogenic 10 Be and 36 Cl geochronology of offset alluvial fans along the northern Death Valley the first geochronologically determined slip rate for the NDVFZ. Our study focuses on the Red Wall Canyon Pleistocene. In situ terrestrial cosmogenic 10 Be and 36 Cl geochronology was used to date the Red Wall Canyon

  6. Fan System Effects: How Fan Ductwork Design Impacts Overall System Efficiency and What the Approach Should be for Optimization 

    E-Print Network [OSTI]

    Martin, V.

    2009-01-01

    expectations once they are installed on the systems for which they have been sold. This is primarily due to the adverse aerodynamic impact of the inlet or outlet connections on the performance capacity of the fan and thus on the overall system efficiency...

  7. 133AMAZON FAN MASS-TRANSPORT AND AVULSION DEPOSITS REVIEW OF THE TIMING AND CAUSES OF THE AMAZON-FAN MASS TRANSPORT

    E-Print Network [OSTI]

    Jones, Peter JS

    of sequence stratigraphy, namely that changes in sea level control basin sedimentation and the emplacement: Amazon Fan, avulsion, slope failure, Pleistocene, sequence stratigraphy External Controls on Deep

  8. Developing Fatigue Pre-crack Procedure to Evaluate Fracture Toughness of Pipeline Steels Using Spiral Notch Torsion Test

    SciTech Connect (OSTI)

    Wang, Jy-An John; Tan, Ting; Jiang, Hao; Zhang, Wei; Feng, Zhili

    2012-10-01

    The spiral notch torsion test (SNTT) has been utilized to investigate the crack growth behavior of X52 steel base and welded materials used for hydrogen infrastructures. The X52 steel materials are received from a welded pipe using friction stir welding techniques. Finite element models were established to study the crack growth behavior of steel SNTT steel samples, which were assumed to be isotropic material. A series SNTT models were set up to cover various crack penetration cases, of which the ratios between crack depth to diameter (a/D ratio) ranging from 0.10 to 0.45. The evolution of compliance and energy release rates in the SNTT method have been investigated with different cases, including different geometries and materials. Indices of characteristic compliance and energy release rates have been proposed. Good agreement has been achieved between predictions from different cases in the same trend. These work shed lights on a successful protocol for SNTT application in wide range of structural materials. The further effort needed for compliance function development is to extend the current developed compliance function to the deep crack penetration arena, in the range of 0.55 to 0.85 to effectively determine fracture toughness for extremely tough materials.

  9. Test procedures and protocols: Their relevance to the figure of merit for thermal distribution systems. Volume 1: Informal report

    SciTech Connect (OSTI)

    Andrews, J.W.

    1993-09-01

    A conceptual framework is developed that categorizes measurement protocols for forced-air thermal distribution systems in small buildings. This framework is based on the distinction between two generic approaches. The {open_quote}system-comparison{close_quote} approach seeks to determine, via a pair of whole-house energy-use measurements, the difference in energy use between the house with the as-found duct system and the same house with no energy losses attributable to the thermal distribution system. The {open_quote}component loss-factor{close_quote} approach identifies and measures the individual causes of duct losses, and then builds up a value for the net overall duct efficiency, usually with the help of computer simulation. Examples of each approach are analyzed and related to a proposed Figure of Merit for thermal distribution systems. This Figure of Merit would serve as the basis for a Standard Method of Test analogous to those already in place for furnaces, boilers, air conditioners, and heat pumps.

  10. Microwave power coupler for a superconducting multiple-cell cavity for accelerator application and its testing procedures

    SciTech Connect (OSTI)

    Li, Jianjian; /IIT, Chicago

    2008-12-01

    Superconducting cavity resonators offer the advantage of high field intensity for a given input power, making them an attractive contender for particle accelerator applications. Power coupling into a superconducting cavity employed in a particle accelerator requires unique provisions to maintain high vacuum and cryogenic temperature on the cavity side, while operating with ambient conditions on the source side. Components introduced to fulfill mechanical requirements must show negligible obstruction of the propagation of the microwave with absence of critical locations that may give rise to electron multipaction, leading to a multiple section design, instead of an aperture, a probe, or a loop structure as found in conventional cavities. A coaxial power coupler for a superconducting multiple-cell cavity at 3.9 GHz has been developed. The cavity is intended to be employed as an accelerator to provide enhanced electron beam quality in a free-electron laser in Hamburg (FLASH) user facility. The design of the coupler called for two windows to sustain high vacuum in the cavity and two bellows to accommodate mechanical dimensional changes resulting from cryogenics. Suppression of multipacting was accomplished by the choice of conductor dimensions and materials with low second yield coefficients. Prior to integration with the cavity, the coupler was tested for intrinsic properties in a back-to-back configuration and conditioned for high-power operation with increasing power input. Maximum incident power was measured to be 61 kW. When integrated with the superconducting cavity, a loaded quality factor of 9 x 10{sup 5} was measured by transient method. Coupler return loss and insertion loss were estimated to be around -21 dB and -0.2 dB, respectively.

  11. LAB 3 Cleanroom Fan and Filters Analysis for the Supports

    SciTech Connect (OSTI)

    Cease, H.; /Fermilab

    1998-05-08

    A 1400 lb blower fan and a 2700 lb filter box are to be supported at Lab 3. The support structure is a framework that suspends from the building wall to the cleanroom and to a washroom. The framework is made of welded 4-inch x 8-inch x 1/4-inch rectangular A36 steel tube. Welds are to be standard prequalified welds as by AISC. The main support frame is approximately 7-feet off the floor and welded onto the top of 10 columns. A deflection and stress study was performed on the planned structure. A scaled plan view is given in drawing 3823.113-MD-358764. The heaviest loaded beams were labeled with a letter designation and were studied for beam deflections and stresses. The 4-inch x 8-inch rectangular tube was also used for the substructure for the fan and filter mounts and to support a temporary floor grating during maintenance.

  12. Fan System Assessment Tool Introduction | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015Executive Order14, 20111,FYDepartment of5 November 2015 PURPOSEFactFan

  13. Standard Methods of Characterizing Performance of Fan Filter Units, Version 3.0

    E-Print Network [OSTI]

    Xu, Tengfang

    2007-01-01

    Feedback Control in a Cleanroom. ” Building and Environment.Fan Filter Units for Cleanroom Applications. ” Building andused in the filter and cleanroom industry, and provides

  14. 2015-03-26 Issuance: Fans and Blowers ASRAC Working Group; Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document. ASRAC Fans and...

  15. Performance Optimization of a Fan System- Overcoming Impacts of Modified Design Criteria Due to Regulatory Requirements and Changed Operating Conditions 

    E-Print Network [OSTI]

    Wroblewski, R. G.; Preis, F.; Smith, R.

    1997-01-01

    by fully opening the fan inlet box damper as well as reduce the fan speed by replacing the belt drive. 94 ESL-IE-97-04-16 Proceedings from the Nineteenth Industrial Energy Technology Conference, Houston, TX, April 23-24, 1997 E-Tube ID Fan The E... to improve process efficiency. Combustion Air Fan Replace inlet ducts. Install a flow-grid metering device. Replace the outlet damper with a variable inlet vane control. Reduce the fan speed by changing the belt drive. Dryer ID Fan Open inlet box...

  16. Hillery-type squeezing in fan-states

    E-Print Network [OSTI]

    Minh Duc Truong; Ba An Nguyen

    2004-03-29

    We study the Hillery-type, i.e. $N$-th power, amplitude squeezing in the fan-state $| \\xi ;2k,f>_{F}$ characterized by $\\xi \\in \\mathcal{C}$, $k=1,2,3,...$ and $f$ a nonlinear operator-valued function. We show that for a given $k$ there exists a critical $\\xi_c$ such that for $0<|\\xi|\\leq|\\xi_c|$ squeezing occurs simultaneously in $2k$ directions for the powers $N$ which are a multiple of $2k$. This result does not depend on the concrete form of $f$, i.e. it holds true for both $f\\equiv 1$ and $f\

  17. Shanghai Fan Qie Trading Ltd | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing Capacity for Low EmissionTianhong Silicon MaterialNew MaterialEco EnergyFan

  18. Sandia Energy - Hongyou Fan Chosen for Prestigious Lecture on Creating

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home RoomPreservation of Fe(II)Geothermal Energy & DrillingNanomaterials Hongyou Fan Chosen for

  19. Inlet swirl distortion effects on the generation and propagation of fan rotor shock noise

    E-Print Network [OSTI]

    Defoe, Jeff (Jeffrey James)

    2011-01-01

    A body-force-based fan model for the prediction of multiple-pure-tone noise generation is developed in this thesis. The model eliminates the need for a full-wheel, three-dimensional unsteady RANS simulation of the fan blade ...

  20. University of Nevada Las Vegas Arduino Project Report: Fan Speed Control as a Function of Thermistor

    E-Print Network [OSTI]

    Kachroo, Pushkin

    University of Nevada Las Vegas Arduino Project Report: Fan Speed Control as a Function, and an arduino board. The arduino board is programmed to read the analog input, the thermistor, and respond by the arduino that will decrease the speed of the fan. Furthermore, if the temperature goes up, the resistance

  1. Seafloor-precipitated carbonate fans in the Neoproterozoic Rainstorm Member, Johnnie Formation, Death Valley Region, USA

    E-Print Network [OSTI]

    Fischer, Woodward

    Seafloor-precipitated carbonate fans in the Neoproterozoic Rainstorm Member, Johnnie Formation Member of the Johnnie Formation, Death Valley, USA. The fans formed in a mixed carbonate of inhibitors to carbonate nucleation (perhaps Fe2+ under anoxic conditions) likely fostered precipitation

  2. A new development in microcomputer software for mine ventilation planning involving the installation of fans

    SciTech Connect (OSTI)

    O'Leary, M.S.J.; McPherson, M.J.

    1989-01-01

    This paper introduces a computer simulation that extends the use of microcomputer systems for mine ventilation planning. The program was developed as part of an ongoing study to produce a simulation model that would determine the optimum duties of a main fan and a booster fan without requiring the trial-and-error runs that are necessary with currently available programs. To use the new program, the user specifies the location of one main fan and one booster fan, and the minimum required airflows in any number of working places. The computer determines the fan duties that maintains the required airflows at the lowest operating costs without causing undesired recirculation. The methodology of the program and an example showing how it can be applied are presented.

  3. Statistic inversion of multi-zone transition probability models for aquifer characterization in alluvial fans

    E-Print Network [OSTI]

    Zhu, Lin; Gong, Huili; Gable, Carl; Teatini, Pietro

    2015-01-01

    Understanding the heterogeneity arising from the complex architecture of sedimentary sequences in alluvial fans is challenging. This paper develops a statistical inverse framework in a multi-zone transition probability approach for characterizing the heterogeneity in alluvial fans. An analytical solution of the transition probability matrix is used to define the statistical relationships among different hydrofacies and their mean lengths, integral scales, and volumetric proportions. A statistical inversion is conducted to identify the multi-zone transition probability models and estimate the optimal statistical parameters using the modified Gauss-Newton-Levenberg-Marquardt method. The Jacobian matrix is computed by the sensitivity equation method, which results in an accurate inverse solution with quantification of parameter uncertainty. We use the Chaobai River alluvial fan in the Beijing Plain, China, as an example for elucidating the methodology of alluvial fan characterization. The alluvial fan is divided...

  4. Building Evacuation Procedures General Procedures

    E-Print Network [OSTI]

    Krovi, Venkat

    Bell Hall Building Evacuation Procedures General Procedures: It is the personal responsibility of all occupants of University buildings to immediately exit the building when the fire alarm is activated. Remaining in the building is unacceptable, regardless of the reason. Occupants should exit from

  5. Building Evacuation Procedures General Procedures

    E-Print Network [OSTI]

    Krovi, Venkat

    Davis Hall Building Evacuation Procedures General Procedures: It is the personal responsibility of all occupants of University buildings to immediately exit the building when the fire alarm is activated. Remaining in the building is unacceptable, regardless of the reason. Occupants should exit from

  6. Fans For Greenhouses1 D. E. Buffington, R. A. Bucklin, R. W. Henley and D. B. McConnell2

    E-Print Network [OSTI]

    Hill, Jeffrey E.

    AE12 Fans For Greenhouses1 D. E. Buffington, R. A. Bucklin, R. W. Henley and D. B. McConnell2 1 drying applications. The propeller fan is the most common fan used for ventilation in greenhouses For Greenhouses In equatio

  7. Toward green systems for cleanrooms: Energy efficient fan-filter units

    SciTech Connect (OSTI)

    Jeng, Ming-Shan; Xu, Tengfang; Lan, Chao-Ho

    2004-07-12

    The paper presents results of laboratory-measured performance of fan-filter units (FFUs) used for cleanrooms. A total of twenty FFUs collected from the market were tested, including thirteen 1220 mm x 610 mm (or 4 ft x 2 ft) units and seven 1220 mm x 1220 mm (or 4 ft x 4 ft) units. The paper concludes that there are wide variations in FFUs energy performance, and that there are opportunities in improving energy efficiency and lowering operating costs of FFUs. Furthermore, the paper suggests the benefits of having a uniform method for testing and reporting FFU performance. Such a testing method and recommended practice guideline is under development, with heavy input from FFU suppliers, users, and independent institutions that include Lawrence Berkeley National Laboratory (LBNL), Industrial Technology Research Institute (ITRI), and Institute of Environmental Sciences and Technology (IEST). An integrated approach with the participation from designers, suppliers, users, and utility companies can help to identify energy-efficient FFUs that are required for many cleanroom applications.

  8. Methodology to Develop and Test an Easy-to-use Procedure for the Preliminary Selection of High-performance Systems for Office Buildings in Hot and Humid Climates 

    E-Print Network [OSTI]

    Cho, Sool Yeon

    2010-10-12

    A procedure has been developed for the preliminary selection of high-performance systems for office buildings in hot and humid climates. High-performance building systems and components were surveyed for buildings in the ...

  9. A prototype fan-beam optical CT scanner for 3D dosimetry

    SciTech Connect (OSTI)

    Campbell, Warren G.; Rudko, D. A.; Braam, Nicolas A.; Jirasek, Andrew [University of Victoria, Victoria, British Columbia V8P 5C2 (Canada); Wells, Derek M. [British Columbia Cancer Agency, Vancouver Island Centre, Victoria, British Columbia V8R 6V5 (Canada)

    2013-06-15

    Purpose: The objective of this work is to introduce a prototype fan-beam optical computed tomography scanner for three-dimensional (3D) radiation dosimetry. Methods: Two techniques of fan-beam creation were evaluated: a helium-neon laser (HeNe, {lambda} = 543 nm) with line-generating lens, and a laser diode module (LDM, {lambda} = 635 nm) with line-creating head module. Two physical collimator designs were assessed: a single-slot collimator and a multihole collimator. Optimal collimator depth was determined by observing the signal of a single photodiode with varying collimator depths. A method of extending the dynamic range of the system is presented. Two sample types were used for evaluations: nondosimetric absorbent solutions and irradiated polymer gel dosimeters, each housed in 1 liter cylindrical plastic flasks. Imaging protocol investigations were performed to address ring artefacts and image noise. Two image artefact removal techniques were performed in sinogram space. Collimator efficacy was evaluated by imaging highly opaque samples of scatter-based and absorption-based solutions. A noise-based flask registration technique was developed. Two protocols for gel manufacture were examined. Results: The LDM proved advantageous over the HeNe laser due to its reduced noise. Also, the LDM uses a wavelength more suitable for the PRESAGE{sup TM} dosimeter. Collimator depth of 1.5 cm was found to be an optimal balance between scatter rejection, signal strength, and manufacture ease. The multihole collimator is capable of maintaining accurate scatter-rejection to high levels of opacity with scatter-based solutions (T < 0.015%). Imaging protocol investigations support the need for preirradiation and postirradiation scanning to reduce reflection-based ring artefacts and to accommodate flask imperfections and gel inhomogeneities. Artefact removal techniques in sinogram space eliminate streaking artefacts and reduce ring artefacts of up to {approx}40% in magnitude. The flask registration technique was shown to achieve submillimetre and subdegree placement accuracy. Dosimetry protocol investigations emphasize the need to allow gel dosimeters to cool gradually and to be scanned while at room temperature. Preliminary tests show that considerable noise reduction can be achieved with sinogram filtering and by binning image pixels into more clinically relevant grid sizes. Conclusions: This paper describes a new optical CT scanner for 3D radiation dosimetry. Tests demonstrate that it is capable of imaging both absorption-based and scatter-based samples of high opacities. Imaging protocol and gel dosimeter manufacture techniques have been adapted to produce optimal reconstruction results. These optimal results will require suitable filtering and binning techniques for noise reduction purposes.

  10. fan blades Karr, O.F.; Brooks, J.B.; Seay, E. 20 FOSSIL-FUELED...

    Office of Scientific and Technical Information (OSTI)

    draft fan blades Karr, O.F.; Brooks, J.B.; Seay, E. 20 FOSSIL-FUELED POWER PLANTS; 32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; 42 ENGINEERING NOT INCLUDED IN OTHER...

  11. Shut Down Fans, Save $1/4 Million/Yr and Increase Airflow? 

    E-Print Network [OSTI]

    Martin, V.; Ohrt, H.

    1998-01-01

    In 1994, the fume collection system for the Desulphurization Station at Dofasco Inc., Hamilton, Ontario was studied for energy and maintenance optimization. The existing system consisted of two 600 hp fans on a wet scrubber system for two collection...

  12. Flexibility of Commercial Building HVAC Fan as Ancillary Service for Smart Grid

    E-Print Network [OSTI]

    Maasoumy, Mehdi

    2013-01-01

    controlled loads for ancillary services,” in Proc. PSCC,P. Barooah, and S. Meyn, “Ancillary service for the grid viaBuilding HVAC Fan as Ancillary Service for Smart Grid Mehdi

  13. Income Tax Deduction for Solar-Powered Roof Vents or Fans

    Broader source: Energy.gov [DOE]

    The taxpayer must provide proof of the taxpayer’s costs for installation of a solar powered roof vent or fan and a list of the persons or corporations that supplied labor or materials for the solar...

  14. Nanostructured photon management for high performance solar cells Jia Zhu, Zongfu Yu, Shanhui Fan, Yi Cui *

    E-Print Network [OSTI]

    Cui, Yi

    research efforts for renewable energy technologies. Solar cells, which harvest energy directly fromNanostructured photon management for high performance solar cells Jia Zhu, Zongfu Yu, Shanhui FanCullough Building 343, Stanford, CA 94305, USA Contents 1. Introduction

  15. Performance characteristics of a low pressure cyclone for axial-flow fan exhausts 

    E-Print Network [OSTI]

    Simpson, Shay Lynn

    1996-01-01

    on axial-flow fan exhausts to significantly reduce particulate emissions. Average emission concentrations, cut-point diameters, PMIO emission concentrations, and fractional efficiencies from this cyclone operating at different cyclone inlet velocities...

  16. Fan System Optimization Improves Production and Saves Energy at Ash Grove Cement Plant

    SciTech Connect (OSTI)

    2002-05-01

    This case study describes an optimization project implemented on a fan system at Ash Grove Cement Company, which led to annual energy and maintenance savings of $16,000 and 175,000 kilowatt-hours (kWh).

  17. Interpreting Soap Operas and Creating Community: Inside a Computer-Mediated Fan Culture

    E-Print Network [OSTI]

    Baym, Nancy K.

    1993-11-01

    document contains the author’s accepted manuscript. For the publisher’s version, see the link in the header of this document.] Interpreting Soap Operas and Creating Community: Inside a Computer–Mediated Fan Culture Nancy K. Baym Visiting.... K. (1993). Interpreting Soap Operas and Creating Community: Inside a Computer-Mediated Fan Culture. Journal of Folklore Research, Vol. 30(2/3), 143-176. Baym, N. K. (1993). Interpreting Soap Operas and Creating Community: Inside a Computer...

  18. Performance of VAV Fan Powered Terminal Units: Experimental Results and Models for Parallel Units 

    E-Print Network [OSTI]

    Furr, J.; O'Neal, D.; Davis, M.; Bryant, J.; Cramlet, A.

    2008-01-01

    Empirical models of airflow output, power consumption, and primary airflow were developed for parallel fan powered variable air volume terminal units at typical operating pres- sures. Both 8 in. (203 mm) and 12 in. (304 mm) primary air inlet terminal units... from three manufacturers were evaluated. Generalized models were developed from the experimental data with coefficients varying by size and manufacturer. Fan power and airflow data were collected at down- stream static pressures over a range from 0...

  19. Energy Efficient Single Stack Exhaust Fan Systems (E3S3F) 

    E-Print Network [OSTI]

    Wang, G.; Liu, M.

    2001-01-01

    exhaust airflow. 1 Patent application pending Stack height is a critical issue in preventing local toxic air contamination. Design rules and criteria have been developed based on recent research.... Therefore, most exhaust systems are designed as constant volume systems with exit velocity of 3,000 fpm. A constant speed fan is typically used. When the airflow from the fume hood is less than the design volume, a make-up air damper at the inlet of the fan...

  20. Performance of VAV Fan Powered Terminal Units: Experimental Results and Models for Series Units 

    E-Print Network [OSTI]

    Furr, J.; O'Neal, D.; Davis, M.; Bryant, J.; Cramlet, A.

    2008-01-01

    Empirical models of airflow output and power consump- tion were developed for series fan powered variable air volume terminal units at typical operating pressures. Terminal units with 8 in. (203 mm) and 12 in. (304 mm) primary air inlets from three different... manufacturers were evaluated. Generalized models were developed from the experimental data with coef- ficients varying by size and manufacturer. Fan power and airflow data were collected at downstream static pressures of 0.25 w.g. (63 Pa). Upstream static...

  1. Generation of fan-states of radiation field in a cavity

    E-Print Network [OSTI]

    Nguyen Ba An; Truong Minh Duc

    2001-11-30

    A scheme of generating recently introduced fan-states | \\alpha, 2k>_F (\\alpha is complex, k=1,2,3,...) is proposed basing on a \\Lambda-type atom-cavity field interaction. We show that with suitable atomic preparations and measurements a passage of a sequence of N atoms through a cavity may transform an initial field coherent state | \\alpha> to a fan-state | \\alpha, 2k>_F with k=2^{N-2}.

  2. Engine having hydraulic and fan drive systems using a single high pressure pump

    DOE Patents [OSTI]

    Bartley, Bradley E. (Manito, IL); Blass, James R. (Bloomington, IL); Gibson, Dennis H. (Chillicothe, IL)

    2000-01-01

    An engine comprises a hydraulic system attached to an engine housing that includes a high pressure pump and a hydraulic fluid flowing through at least one passageway. A fan drive system is also attached to the engine housing and includes a hydraulic motor and a fan which can move air over the engine. The hydraulic motor includes an inlet fluidly connected to the at least one passageway.

  3. Parametric System Curves: Correlations Between Fan Pressure Rise and Flow for Large Commercial Buildings

    SciTech Connect (OSTI)

    Sherman, Max; Wray, Craig

    2010-05-19

    A substantial fraction of HVAC energy use in large commercial buildings is due to fan operation. Fan energy use depends in part on the relationship between system pressure drop and flow through the fan, which is commonly called a "system curve." As a step toward enabling better selections of air-handling system components and analyses of common energy efficiency measures such as duct static pressure reset and duct leakage sealing, this paper shows that a simple four-parameter physical model can be used to define system curves. Our model depends on the square of the fan flow, as is commonly considered. It also includes terms that account for linear-like flow resistances such as filters and coils, and for supply duct leakage when damper positions are fixed or are changed independently of static pressure or fan flow. Only two parameters are needed for systems with variable-position supply dampers (e.g., VAV box dampers modulating to control flow). For these systems, reducing or eliminating supply duct leakage does not change the system curve. The parametric system curve may be most useful when applied to field data. Non-linear techniques could be used to fit the curve to fan pressure rise and flow measurements over a range of operating conditions. During design, when measurements are unavailable, one could use duct design calculation tools instead to determine the coefficients.

  4. International Comparison of Energy Efficiency Criteria and Test Procedures in Standards and Labeling Programs for Computer Monitors and Commercial Gas Stoves

    E-Print Network [OSTI]

    Khanna, Nina

    2014-01-01

    1.4 Hong Kong Voluntary Energy Label Test Standard forThe Hong Kong Voluntary Energy Efficiency Labeling Schemeon possible Ecodesign and Energy Labelling Requirements for

  5. Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards and Labeling Programs for Clothes Washers, Water Dispensers, Vending Machines and CFLs

    E-Print Network [OSTI]

    Fridley, David

    2010-01-01

    content test in which water and energy consumption areconsumption, the hot water energy consumption and the energyenergy consumption, hot water energy consumption and energy

  6. Acceptance Test Procedure for Project 251W, WBS 3, Substation A-8, Building 251-W, Bus {number_sign}2 switchgear replacement

    SciTech Connect (OSTI)

    VanBaalen, R.A.

    1995-02-01

    This document records the steps taken and results of the acceptance testing of the new 13.8kV switchgear installed at 251W. This gear is under the administrative control of Electrical Utilities.

  7. Additional Guidance Regarding Application of Current Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010. Draft of DOE...

  8. Software Verification and Validation Procedure

    SciTech Connect (OSTI)

    Olund, Thomas S.

    2008-09-15

    This Software Verification and Validation procedure provides the action steps for the Tank Waste Information Network System (TWINS) testing process. The primary objective of the testing process is to provide assurance that the software functions as intended, and meets the requirements specified by the client. Verification and validation establish the primary basis for TWINS software product acceptance.

  9. Impact of ethanol and butanol as oxygenates on SIDI engine efficiency and emissions using steady-state and transient test procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    Alcohols as gasoline blending agent at up to 85 vol-% levels were evaluated in a 2.2L direct injection SI engine for combustion, engine efficiency, and engine-out emissions effects at steady-state and transient test conditions

  10. Asymmetrical-fan tranmission CT on SPECT to derive {mu}-maps for attenuation correction

    SciTech Connect (OSTI)

    Loncaric, S.; Huang, G.; Ni, B. [Rush-Presbyterian-St. Luke`s Medical Center, Chicago, IL (United States)] [and others

    1994-05-01

    For proper attenuation correction of SPECT images, an appropriate {mu}-map properly registered with each imaging slices is needed. Among the many techniques for {mu}-map derivation, simultaneous or sequential fan-beam transmission CT (TCT), on the same SPECT system with the same acquisition settings, have advantages of being practical while ensuring registration. However, the problems are: (1) limited FOV for thoracic imaging, projection would be truncated with a typical size detector, (2) lack of room for placing the transmission source in many SPECT systems. We have developed a new sampling scheme to solve the problems mentioned above. This scheme uses an asymmetrical-fan geometry (AFG), which samples only half of the field, the other half would be sampled after an 180{degrees} detector rotation. This technique completes the minimum sampling requirement in a 360{degrees} detector rotation and yields a relatively large FOV defined by the outside edge of the sampling fan. We have confirmed the feasibility of the AFG sampling on a 3-head SPECT system to provide a large FOV for TCT of most patient. The TCT sampling scheme is achieved with an asymmetrical-fan collimator. We have developed the required new reconstruction algorithms and derived excellent reconstructed images of phantoms and human subjects. We propose to have this technique implemented in a short and fast transmission scan in a multi-head SPECT system, after emission imaging, because the detectors have to be pulled out to make room for the transmission source. The imaging field can even exceed the full field size of the detector. MS would be possible when an obtuse sampling fan is formed by shifting the source outward further, provided the central FOV is properly covered with a supplementary sampling scheme, e.g., using another TCT with a fan-beam collimator on another one of the detectors.

  11. Impacts of Static Pressure Reset on VAV System Air Leakage, Fan Power and Thermal Energy - Part 2: Case Demonstration for a Typical Climate System 

    E-Print Network [OSTI]

    Liu, M.; Zheng, K.; Wu, L.; Wang, Z.; Johnson, C.

    2007-01-01

    In Part 1 of this paper, the theoretical models, integrating the fan airflow, fan head, air leakage factors, are developed to analyze the impacts of the static pressure reset on both pressure dependent and pressure independent terminal boxes...

  12. Impacts of Static Pressure Reset on VAV System Air Leakage, Fan Power and Thermal Energy - Part I: Theoretical Model and Simulation 

    E-Print Network [OSTI]

    Liu, M.; Feng, J.; Wang, Z.; Wu, L.; Zheng, K.; Pang, W.

    2007-01-01

    pressure reset has also applicable advantages over the existing constant static pressure set point and two typical reset methods. This paper present the theoretical models to express the impacts of static pressure reset on fan airflow, fan head, air leakage...

  13. ISSUANCE 2015-08-21: Energy Efficiency Program for Commercial and Industrial Equipment: Notice of Open Meetings for the Fans and Blowers Working Group

    Broader source: Energy.gov [DOE]

    Energy Efficiency Program for Commercial and Industrial Equipment: Notice of Open Meetings for the Fans and Blowers Working Group

  14. TAILINGS FANS AND VALLEY-SPUR CUTOFFS 869 Copyright 2004 John Wiley & Sons, Ltd. Earth Surf. Process. Landforms 29, 869882 (2004)

    E-Print Network [OSTI]

    James, L. Allan

    2004-01-01

    of natural earthfill dam spillway not prone to catastrophic failures. Tailing fans, valley-spur cutoffs Superfund cleanup site to remove mercury. Some large tailings fans dammed main channels resulting in lakesTAILINGS FANS AND VALLEY-SPUR CUTOFFS 869 Copyright © 2004 John Wiley & Sons, Ltd. Earth Surf

  15. Development of a Fan-Filter Unit Test Standard, Laboratory Validations, and its Applications across Industries

    E-Print Network [OSTI]

    Xu, Tengfang

    2008-01-01

    Developing Energy-rebate Criteria through PerformingFFUs. A successful energy-rebate program would allow ato establish energy-rebate criteria, and implement

  16. Development of a Fan-Filter Unit Test Standard, Laboratory Validations, and its Applications across Industries

    E-Print Network [OSTI]

    Xu, Tengfang

    2008-01-01

    standards. IEST is an ANSI-accredited standards-developingAdministrator of the ANSI- accredited US TAG to ISO/TCand a founding member of the ANSI- accredited US TAG to ISO/

  17. Varying-Coefficient Functional Linear Yichao Wu , Jianqing Fan and Hans-Georg Muller

    E-Print Network [OSTI]

    Müller, Hans-Georg

    Varying-Coefficient Functional Linear Regression Yichao Wu , Jianqing Fan and Hans-Georg M¨uller NCSU, Princeton University, and UC-Davis Abstract: Functional linear regression analysis aims to model arguments of the regression parameter function. This extension of the functional linear regression model

  18. Voxels on Fire Ye Zhao Xiaoming Wei Zhe Fan Arie Kaufman Hong Qin

    E-Print Network [OSTI]

    Qin, Hong

    Voxels on Fire Ye Zhao Xiaoming Wei Zhe Fan Arie Kaufman Hong Qin Center for Visual Computing a method for the animation of fire propagation and the burning consumption of objects represented as volumetric data sets. Our method uses a volumetric fire propagation model based on an enhanced distance field

  19. Performance Analysis of Dual-Fan, Dual-Duct Constant Volume Air-Handling Units 

    E-Print Network [OSTI]

    Joo, I. S.; Liu, M.

    2001-01-01

    Dual-fan, dual-duct air-handling units introduce outside air directly into the cooling duct and use two variable speed devices to independently maintain the static pressure of the hot and the cold air ducts. Analytical models have been developed...

  20. CHANGES IN SANDSTONE DISTRIBUTIONS BETWEEN THE UPPER, MIDDLE, AND LOWER FAN IN THE ARKANSAS JACKFORK GROUP 

    E-Print Network [OSTI]

    Mack, Clayton P.

    2010-07-14

    outcrops, it is clear there is an obvious change in the sandstone percentage and distribution. The upper fan deposit has an overall sandstone percentage of approximately 77.5% and is deposited in beds that are mainly amalgamated; 10-30m thick. Sandstone...

  1. High-amplitude reflection packets (HARPs) of the Mississippi Fan, Gulf of Mexico 

    E-Print Network [OSTI]

    Francis, Jason Michael

    2000-01-01

    Examination of seismic data from the deep-water Gulf of Mexico reveals the presence of High-Amplitude Reflection Packets (HARPs). An analog study conducted by the Ocean Drilling Program Leg 155 identified and described Amazon Fan HARPs as a stacked...

  2. The Spurious Path Problem in Abstraction Gaojian Fan and Robert C. Holte

    E-Print Network [OSTI]

    Holte, Robert

    The Spurious Path Problem in Abstraction Gaojian Fan and Robert C. Holte University of Alberta, Edmonton, Alberta, Canada {gaojian, rholte}@ualberta.ca Abstract Abstraction is a powerful technique. We provide syntactical conditions under which our method can re- move state-independent spurious

  3. NATURAL HAZARDS ON ALLUVIAL FANS: THE VENEZUELA DEBRIS FLOW AND FLASH FLOOD DISASTER

    E-Print Network [OSTI]

    Eaton, L. Scott

    NATURAL HAZARDS ON ALLUVIAL FANS: THE VENEZUELA DEBRIS FLOW AND FLASH FLOOD DISASTER In December Venezuela. Rainfall on December 2-3 totaled 200 millimeters (8 inches) and was followed by a major storm, Denver, Colorado, Naples, Italy, and Vargas, Venezuela. In time scales spanning thousands of years

  4. Virtual Prototyping Examples for Automotive Industries Fan Dai, Wolfgang Felger, Thomas Fruhauf,

    E-Print Network [OSTI]

    Zachmann, Gabriel

    Virtual Prototyping Examples for Automotive Industries Fan Dai, Wolfgang Felger, Thomas Fr­ ical prototypes. In the automotive industries, CAD and CAE systems are widely used. This provides a good basis for virtual prototyping. This vision is therefore extremely interesting for automotive in

  5. Challenges and Prospects of Nanopillar-Based Solar Cells Zhiyong Fan1,2,3

    E-Print Network [OSTI]

    Javey, Ali

    ], and solar energy into electricity [20 33]. In this review article, we summarize the continuous progress own advantages and disadvantages. The device structures utilizing radial NPL junctions (i.e., coreChallenges and Prospects of Nanopillar-Based Solar Cells Zhiyong Fan1,2,3 , Daniel J. Ruebusch1

  6. 2008-601-00 ISRP FAN 1 Upper Lemhi River Acquisition 1 Narrative Preamble

    E-Print Network [OSTI]

    ­ Acquisition 2 Upper Salmon and historically a major spawning and rearing tributary for Snake River spring/summer-run tributary streams to the Lemhi River to benefit all life stages of Snake River spring/summer-run Chinook2008-601-00 ISRP FAN 1 Upper Lemhi River ­ Acquisition 1 Narrative Preamble: The Columbia Basin

  7. Waveguides in inverted opal photonic Virginie Lousse 1,2 and Shanhui Fan 1

    E-Print Network [OSTI]

    Fan, Shanhui

    Waveguides in inverted opal photonic crystals Virginie Lousse 1,2 and Shanhui Fan 1 1 Ginzton phenomena are investigated in an inverted opal photonic crystal made of interpenetrating air spheres, coated, and simulations," Phys. Rev. E 71, 026,605 (2005). 12. V.N. Astratov, et al, "Optical spectroscopy of opal

  8. Project 1640 Palomar Procedures

    E-Print Network [OSTI]

    Project 1640 Palomar Procedures Version 0.1 7/7/08 2:11:08 PM #12;2 Project 1640 Design..................................................................................................................... 1 Palomar Procedures

  9. 2014-09-16 Issuance: Energy Efficiency Program for Consumer Products...

    Broader source: Energy.gov (indexed) [DOE]

    2015-05-26: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule 2014-05-05 Ceiling Fan Engineering Data and Life-cycle Cost Analysis...

  10. Advanced Rooftop Control (ARC) Retrofit: Field-Test Results

    SciTech Connect (OSTI)

    Wang, Weimin; Katipamula, Srinivas; Ngo, Hung; Underhill, Ronald M.; Taasevigen, Danny J.; Lutes, Robert G.

    2013-07-31

    The multi-year research study was initiated to find solutions to improve packaged equipment operating efficiency in the field. Pacific Northwest National Laboratory (PNNL), with funding from the U.S. Department of Energy’s (DOE’s) Building Technologies Office (BTO) and Bonneville Power Administration (BPA) conducted this research, development and demonstration (RD&D) study. Packaged equipment with constant speed supply fans is designed to provide ventilation at the design rate at all times when the fan is operating as required by building code. Although there are a number of hours during the day when a building may not be fully occupied or the need for ventilation is lower than designed, the ventilation rate cannot be adjusted easily with a constant speed fan. Therefore, modulating the supply fan in conjunction with demand controlled ventilation (DCV) will not only reduce the coil energy but also reduce the fan energy. The objective of this multi-year research, development and demonstration project was to determine the magnitude of energy savings achievable by retrofitting existing packaged rooftop air conditioners with advanced control strategies not ordinarily used for packaged units. First, through detailed simulation analysis, it was shown that significant energy (between 24% and 35%) and cost savings (38%) from fan, cooling and heating energy consumption could be realized when packaged air conditioning units with gas furnaces are retrofitted with advanced control packages (combining multi-speed fan control, integrated economizer controls and DCV). The simulation analysis also showed significant savings for heat pumps (between 20% and 60%). The simulation analysis was followed by an extensive field test of a retrofittable advanced rooftop unit (RTU) controller.

  11. A general design for energy test procedures

    E-Print Network [OSTI]

    Meier, Alan

    2000-01-01

    94(2): 1713-1735. Arthur D. Little Inc. 1982. RefrigeratorCambridge (Mass. ): Arthur D. Little Inc. Domanski, P.A.for refrigerators (Arthur D. Little Inc. 1982), air

  12. Procedure for Performing PEM Single Cell Testing

    Broader source: Energy.gov [DOE]

    Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia

  13. Specifications and Test Procedures | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power AdministrationRobust,Field-effect Photovoltaics -7541C.3 Special Report: OAS-RA-14-03SpecializedSpecifications

  14. Test Procedure Waivers | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLEStatutory Authority J-I- 1MayTechnologyTeryn Norris About Us

  15. Current Test Procedure Waivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergy Webinar:IAbout Us » ContactCounty AimsCurrent PortfolioCurrent

  16. Standards and Test Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsofProgram: Report AppendicesAVideoSolarSpace-BasedFact Sheet |

  17. Film Cooling with Forward and Backward Injection for Cylindrical and Fan-shaped Holes Using PSP Measurement Technique 

    E-Print Network [OSTI]

    Chen, Andrew F

    2013-11-08

    effectiveness distributions were obtained using the steady state pressure sensitive paint (PSP) technique. Four common film-hole geometries with forward injection were used in this study: simple angled cylindrical holes and fan-shaped holes, and compound angled...

  18. Optimized Fan Control In Variable Air Volume HVAC Systems Using Static Pressure Resets: Strategy Selection and Savings Analysis 

    E-Print Network [OSTI]

    Kimla, John

    2010-07-14

    The potential of static pressure reset (SPR) control to save fan energy in variable air volume HVAC systems has been well documented. Current research has focused on the creation of reset strategies depending on specific ...

  19. Economic Recovery of Oil Trapped at Fan Margins Using High Angle Wells and Multiple Hydraulic Fractures

    SciTech Connect (OSTI)

    Mike L. Laue

    1997-05-30

    The distal fan margin in the northeast portion of the Yowlumne field contains significant reserves but is not economical to develop using vertical wells. Numerous interbedded shales and deteriorating rock properties limit producibility. In addition, extreme depths (13,000 ft) present a challenging environment for hydraulic fracturing and artificial lift. Lastly, a mature waterflood increases risk because of the uncertainty with size and location of flood fronts. This project attempts to demonstrate the effectiveness of exploiting the distal fan margin of this slope-basin clastic reservoir through the use of a high-angle well completed with multiple hydraulic-fracture treatments. The combination of a high-angle (or horizontal) well and hydraulic fracturing will allow greater pay exposure than can be achieved with conventional vertical wells while maintaining vertical communication between thin interbedded layers and the wellbore. The equivalent production rate and reserves of three vertical wells are anticipated at one-half to two-thirds the cost.

  20. A hydrogeological evaluation of alluvial fans in northern Big Bend National Park, Texas, using geophysical methods 

    E-Print Network [OSTI]

    Archer, Jerry Alan

    1982-01-01

    additional ground-water resources. One major aspect of the 5 yr investigation is to study the hydrogeologic role of the extensive alluvial deposits. This portion of the project is aimed at determining alluvial fan morphol- ogy and bedrock topography.... Seismic Investigation Previous Work The seismic refraction technique has been used extensively in ground-water exploration, particularly when the hydrogeologic situation consists of unconsolidated sands and gravel overlying WELL IO, 4a, '2 3 ~b 4 5...

  1. Experimental optimization of cooling-tower-fan control based on field data. Master's thesis

    SciTech Connect (OSTI)

    Herman, D.L.

    1991-04-01

    Energy costs continue to play an important role in the decision-making process for building design and operation. Since the chiller, cooling tower fans, and associated pumps consume the largest fraction of energy in a heating, ventilating, and air-conditioning (HVAC) system, the control of these components is of major importance in determining building energy use. A significant control parameter for the chilled water system is the minimum entering condenser water set point temperature at which the cooling tower fans are cycled on and off, several studies have attempted to determine the optimum value for this minimum set point temperature, but direct measurements are not available to validate these studies. The purpose of this study was to experimentally determine the optimum minimum entering condenser water set point temperature from field data based on minimum energy consumption and to validate a chilled water system analytical model previously developed in earlier work. The total chiller system electrical consumption (chiller and cooling tower fan energy) was measured for four entering condensor water set point temperatures (70, 75, 80, and 85 deg F). The field results were compared to results obtained using an analytical model previously developed in a thesis entitled Optimized Design of a Commercial Building Chiller/Cooling Tower System, written by Joyce.

  2. Economic Recovery of Oil Trapped at Fan Margins Using Hig Angle Wells Multiple Hydraulic Fractures

    SciTech Connect (OSTI)

    Laue, M.L.

    1997-11-21

    The Yowlumne field is a giant field in the southern San Joaquin basin, Kern County, California. It is a deep (13,000 ft) waterflood operation that produces from the Miocene- aged Stevens Sand. The reservoir is interpreted as a layered, fan-shaped, prograding turbidite complex containing several lobe-shaped sand bodies that represent distinct flow units. A high ultimate recovery factor is expected, yet significant quantities of undrained oil remain at the fan margins. The fan margins are not economic to develop using vertical wells because of thinning pay, deteriorating rock quality, and depth. This project attempts to demonstrate the effectiveness of exploiting the northeast distal fan margin through the use of a high- angle well completed with multiple hydraulic- fracture treatments. A high-angle well offers greater pay exposure than can be achieved with a vertical well. Hydraulic-fracture treatments will establish vertical communication between thin interbedded layers and the wellbore. The equivalent production rate and reserves of three vertical wells are anticipated at a cost of approximately two vertical wells. The near-horizontal well penetrated the Yowlumne sand; a Stevens sand equivalent, in the distal fan margin in the northeast area of the field. The well was drilled in a predominately westerly direction towards the interior of the field, in the direction of improving rock quality. Drilling and completion operations proved to be very challenging, leading to a number of adjustments to original plans. Hole conditions resulted in obtaining less core material than desired and setting intermediate casing 1200 ft too high. The 7 in. production liner stuck 1000 ft off bottom, requiring a 5 in. liner to be run the rest of the way. The cement job on the 5 in. liner resulted in a very poor bond, which precluded one of three hydraulic fracture treatments originally planned for the well. Openhole logs confirmed most expectations going into the project about basic rock properties: the formation was shaly with low porosities, and water saturations were in line with expectations, including the presence of some intervals swept out by the waterflood. High water saturations at the bottom of the well eliminated one of the originally planned hydraulic fracture treatments. Although porosities proved to be low, they were more uniform across the formation than expected. Permeabilities of the various intervals continue to be evaluated, but appear to be better than expected from the porosity log model derived in Budget Period One. The well was perforated in all pay sections behind the 5 in. liner. Production rates and phases agree nicely with log calculations, fractional flow calculations, and an analytical technique used to predict the rate performance of the well.

  3. Computerized procedures system

    DOE Patents [OSTI]

    Lipner, Melvin H. (Monroeville, PA); Mundy, Roger A. (North Huntingdon, PA); Franusich, Michael D. (Upper St. Clair, PA)

    2010-10-12

    An online data driven computerized procedures system that guides an operator through a complex process facility's operating procedures. The system monitors plant data, processes the data and then, based upon this processing, presents the status of the current procedure step and/or substep to the operator. The system supports multiple users and a single procedure definition supports several interface formats that can be tailored to the individual user. Layered security controls access privileges and revisions are version controlled. The procedures run on a server that is platform independent of the user workstations that the server interfaces with and the user interface supports diverse procedural views.

  4. Implementing MSE 2000: Procedures 

    E-Print Network [OSTI]

    Brown, M.; Adams, J.

    2000-01-01

    do not spawn lasting procedures, and the advances achieved through crisis management are not sustained without formal procedures and an organizational commitment to continual improvement, efficiency gains made during an energy dilemma are quickly lost...

  5. TEST PROCEDURE VALIDATION TEST OF A DISCRIMINATING TRITIUM MONITOR...

    Office of Environmental Management (EM)

    from the low concentration of other materials being measured. WE NOTE THAT Most ionizing radiation detector types exhibit significant cross talk when presented with multiple...

  6. Strategy for the Operation of Cooling Towers with variable Speed Fans

    E-Print Network [OSTI]

    Ińigo-Golfín, J

    2001-01-01

    Within the SPS Cooling Water Project at CERN aimed at the reduction of water consumption, this primary open cooling loop will be closed and all the primary cooling circuit components will be upgraded to the new required duty and brought to the necessary safety and operability standards. In particular the tower fans will be fitted with variable frequency drives to replace the existing two speed motors. This paper presents a study to optimize the operation of SPS cooling towers taking into account outdoor conditions (wet and dry bulb temperatures) and the entirety of the primary circuit in which they will operate.

  7. 2015-03-26 Issuance: Fans and Blowers ASRAC Working Group; Notice of Intent

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l De p u t y A s s iof1 of 8 2 of 8of| Department of Energy Fans

  8. 2014-09-19 Issuance: Energy Conservation Program for Consumer...

    Broader source: Energy.gov (indexed) [DOE]

    of proposed rulemaking regarding Energy Conservation Program for Consumer Products: Test Procedure for Ceiling Fans, as issued by the Deputy Assistant Secretary for Energy...

  9. ISSUANCE 2015-06-25: Energy Conservation Program: Energy Conservation...

    Broader source: Energy.gov (indexed) [DOE]

    for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking...

  10. Trial-unique, delayed nonmatching-to-location (TUNL) touchscreen testing for mice: Sensitivity to dorsal hippocampal dysfunction

    E-Print Network [OSTI]

    Kim, Chi Hun; Romberg, Carola; Hvoslef-Eide, Martha; Oomen, Charlotte A.; Mar, Adam C.; Heath, Christopher J.; Berthiaume, Andrée-Anne; Bussey, Timothy J.; Saksida, Lisa M.

    2015-01-01

    housed between three and four per cage. The holding room maintained a 12-hour light cycle (lights off: 7 AM). All experiments were performed during the dark cycle and were in accordance with the UK Animals (Scientific Procedures) Act, 1986... with a house light, a tone generator, a ventilating fan and an IR camera. ABET software by Campden Instruments Ltd. was used to control the system and to collect data. Behavioural procedures The training of mice before the TUNL task followed...

  11. Jianguo Fan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesse Bergkamp Graduate student Subtask 4 project: "Synthesis

  12. Observations of supra-arcade fans: instabilities at the head of reconnection jets

    SciTech Connect (OSTI)

    Innes, D. E.; Guo, L.-J.; Schmit, D.; Bhattacharjee, A.; Huang, Y.-M.

    2014-11-20

    Supra-arcade fans are bright, irregular regions of emission that develop during eruptive flares above flare arcades. The underlying flare arcades are thought to be a consequence of magnetic reconnection along a current sheet in the corona. At the same time, theory predicts plasma jets from the reconnection sites which are extremely difficult to observe directly because of their low densities. It has been suggested that the dark supra-arcade downflows (SADs) seen falling through supra-arcade fans may be low-density jet plasma. The head of a low-density jet directed toward higher-density plasma would be Rayleigh-Taylor unstable, and lead to the development of rapidly growing low- and high-density fingers along the interface. Using Solar Dynamics Observatory/Atmospheric Imaging Assembly 131 Ĺ images, we show details of SADs seen from three different orientations with respect to the flare arcade and current sheet, and highlight features that have been previously unexplained, such as the splitting of SADs at their heads, but are a natural consequence of instabilities above the arcade. Comparison with three-dimensional magnetohydrodynamic simulations suggests that SADs are the result of secondary instabilities of the Rayleigh-Taylor type in the exhaust of reconnection jets.

  13. Procedures and Instructions | Department of Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Records Management Procedures and Instructions Procedures and Instructions Records Management Processes Procedure for Conducting a Records Inventory (PDF) Procedure for...

  14. Web-based Support Systems for Sustainable Communities W.N. Liu J.T. Yao L. Fan Y.Y. Yao X.D. Yang

    E-Print Network [OSTI]

    Yao, JingTao

    present an architecture of Web-based support systems for sustainable communities. The architectureWeb-based Support Systems for Sustainable Communities W.N. Liu J.T. Yao L. Fan Y.Y. Yao X.D. Yang,fan,yyao,yang}@cs.uregina.ca ABSTRACT This paper studies Web-based support systems for sustain- able communities. A sustainable

  15. Text Delegation Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    Procedures for Line Managers' Delegations of Authority when proposing new delegations, redelegating existing delegation, proposing an amendment, rescinding a delegation, and when a delegation is not needed.

  16. Vehicle Technologies Office: Advanced Vehicle Testing Activity...

    Energy Savers [EERE]

    (AVTA) Data and Results The Vehicle Technologies Office (VTO) supports work to develop test procedures and carry out testing on a wide range of advanced vehicles and technologies...

  17. Test Automation Test Automation

    E-Print Network [OSTI]

    Mousavi, Mohammad

    Test Automation Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2013 Mousavi: Test Automation #12;Test Automation Outline Test Automation Mousavi: Test Automation #12;Test Automation Why? Challenges of Manual Testing Test-case design: Choosing inputs

  18. y 1000km of high resolution sleeve-gun array transects on the North Sza Fan, located at tbe mouth orwegian Channel, reveal three domina tyles of sedimentation within a thick

    E-Print Network [OSTI]

    y 1000km of high resolution sleeve-gun array transects on the North Sza Fan, located at tbe mouth the lution data across the fan other than conventional he seismic source was an arra nstruments 40 in3 sleeve-guns along the fan axis. These data were shot with the same sleeve-gun array but recorded digitally via a 144

  19. Study of the Effects of Ambient Conditions Upon the Performance of Fan Powered, Infrared Natural Gas Burners

    SciTech Connect (OSTI)

    Clark Atlanta University

    2002-12-02

    The objective of this investigation was to characterize the operation of a fan-powered, infrared burner (IR burner) at various gas compositions and ambient conditions, develop numerical model to simulate the burner performances, and provide design guidelines for appliances containing PIR burners for satisfactory performance.

  20. Gas-surface scattering with multiple collisions in the physisorption potential well Guoqing Fan and J. R. Manson

    E-Print Network [OSTI]

    Manson, Joseph R.

    Gas-surface scattering with multiple collisions in the physisorption potential well Guoqing Fan The problem of gas-surface collisions is developed in terms of a theoretical formalism that allows calcula gas distributions are considered, a monoenergetic incident beam and an equilibrium gas appropriate

  1. Inferring Air Pollution by Sniffing Social Media Shike Mei, Han Li, Jing Fan, Xiaojin Zhu and Charles R. Dyer

    E-Print Network [OSTI]

    Dyer, Charles R.

    Inferring Air Pollution by Sniffing Social Media Shike Mei, Han Li, Jing Fan, Xiaojin Zhu issue of air pollution in China and elsewhere in the world is to monitor it. While more physical prediction performance of our approach. I. INTRODUCTION Air pollution is a significant issue in China

  2. Stimulated Emission from a Single Excited Atom in a Waveguide Eden Rephaeli1,* and Shanhui Fan2,

    E-Print Network [OSTI]

    Fan, Shanhui

    Stimulated Emission from a Single Excited Atom in a Waveguide Eden Rephaeli1,* and Shanhui Fan2, 1; published 3 April 2012) We study stimulated emission from an excited two-level atom coupled to a waveguide by the atom, plays a very important role in stimulated emission. Additionally, the temporal duration

  3. PScout: Analyzing the Android Permission Specification Kathy Wain Yee Au, Yi Fan Zhou, Zhen Huang and David Lie

    E-Print Network [OSTI]

    Lie, David

    PScout: Analyzing the Android Permission Specification Kathy Wain Yee Au, Yi Fan Zhou, Zhen Huang and implementation. In this paper, we perform an analysis of the permission system of the Android smartphone OS in an attempt to begin answering some of these questions. Be- cause the documentation of Android's permission

  4. Inferring Air Pollution by Sniffing Social Media Shike Mei, Han Li, Jing Fan, Xiaojin Zhu and Charles R. Dyer

    E-Print Network [OSTI]

    Zhu, Xiaojin "Jerry"

    Inferring Air Pollution by Sniffing Social Media Shike Mei, Han Li, Jing Fan, Xiaojin Zhu issue of air pollution in China and elsewhere in the world is to monitor it. While more physical monitoring stations are built, current coverage is limited to large cities with most other places under

  5. Statistical simulation procedures 

    E-Print Network [OSTI]

    Tremelling, Robert Norman

    1970-01-01

    that theoretical procedures are im- practical. Thus, with the advent of the electronic computer, numeri ca'I or simul ation procedures for ap- proximating this distribution function have been de- veloped. For the extension of the Stratified Monte Carlo (S. M... distribution functions ano their parameters. With the rising importance of statistics, and the advent of the computer, Honte Carlo methods are just now being investigated. Although definitions of Honte Carlo samplino may differ, it is usually associated...

  6. GAP TESTS; COMPARISON BETWEEN UN GAP TEST AND CARD GAP TEST

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    98-36 GAP TESTS; COMPARISON BETWEEN UN GAP TEST AND CARD GAP TEST by R. BRANKA and C. MICHOT, FRANCE (tel.: 33 3 44 55 65 19, fax: 33 3 44 55 65 10) ABSTRACT: UN gap test, type 1(a) or 2(a), is the recommended test in the acceptance procedure for transport of explosives in class 1. Up to the revision

  7. Economic recovery of oil trapped at fan margins using high angle wells and multiple hydraulic fractures. Quarterly report, October 1--December 31, 1996

    SciTech Connect (OSTI)

    Laue, M.L.

    1997-02-13

    This project attempts to demonstrate the effectiveness of exploiting thin-layered, low-energy deposits at the distal margin of a prograding turbidite complex through the use of hydraulically- fractured horizontal or high-angle wells. The combination of a horizontal or high-angle well and hydraulic fracturing will allow greater pay exposure than can be achieved with conventional vertical wells while maintaining vertical communication between thin interbedded layers and the wellbore. A high-angle well will be drilled in the fan-margin portion of a slope-basin clastic reservoir and will be completed with multiple hydraulic-fracture treatments. Geologic modeling, reservoir characterization, and fine-grid reservoir simulation will be used to select the well location and orientation. Design parameters for the hydraulic-fracture treatments will be determined, in part, by fracturing an existing test well. Fracture azimuth will be predicted by passive seismic monitoring of a fracture-stimulation treatment in the test well using logging tools in an offset well. The Unites States Department of Energy granted approval of the continuation application to implement Budget Period Two effective November 21, 1996. The only Budget Period One activities for the quarter involved project administration. Budget Period Two activities were initiated with the development of a drilling program for the high-angle slant well. The well was spud on December 4, 1996 and was drilling at 10,830 ft in the vertical section of the hole as of the end of the month.

  8. Feasibility of an appliance energy testing and labeling program for Sri Lanka

    SciTech Connect (OSTI)

    Biermayer, Peter; Busch, John; Hakim, Sajid; Turiel, Issac; du Pont, Peter; Stone, Chris

    2000-04-01

    A feasibility study evaluated the costs and benefits of establishing a program for testing, labeling and setting minimum efficiency standards for appliances and lighting in Sri Lanka. The feasibility study included: refrigerators, air-conditioners, flourescent lighting (ballasts & CFls), ceiling fans, motors, and televisions.

  9. FRENCH APPROVAL PROCEDURES FOR PYROTECHNICAL AUTOMOTIVE SAFETY

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    equipments such gas generators for airbag modules or seat-belt pretensioners, pyrotechnic relay compositions and/or igniters inside those gas generators fall into that case. The approval procedure, test methods specify that pyrotechnical devices for automotive safety, relay compositions and igniters in such devices

  10. FAYETTEVILLE POLICIES AND PROCEDURES 211.0 Weather Emergency Procedure

    E-Print Network [OSTI]

    Capogna, Luca

    1 FAYETTEVILLE POLICIES AND PROCEDURES 211.0 Weather Emergency Procedure General Procedures of the campus community. The university's procedures for responding to inclement weather events necessarily apply whatever time of day or night these events occur. The university may respond to inclement weather

  11. Gravid Mosquito Trap P462 -Trap The ChemTica GMT operates on 4 size D cell batteries. A photo-activated switch turns on the fan

    E-Print Network [OSTI]

    Ishida, Yuko

    batteries. A photo-activated switch turns on the fan at dusk. Manual shutoff is required at dawn to prevent at dawn to prevent loss of trapped mosquitoes. Power is supplied by four D cell batteries. The upper case

  12. Development of a Laboratory Verified Single-Duct VAV System Model with Fan Powered Terminal Units Optimized Using Computational Fluid Dynamics 

    E-Print Network [OSTI]

    Davis, Michael A.

    2011-10-21

    Single Duct Variable Air Volume (SDVAV) systems use series and parallel Fan Powered Terminal Units to control the air flow in conditioned spaces. This research developed a laboratory verified model of SDVAV systems that ...

  13. Final Report Independent Verification Survey of the High Flux Beam Reactor, Building 802 Fan House Brookhaven National Laboratory Upton, New York

    SciTech Connect (OSTI)

    Harpeneau, Evan M.

    2011-06-24

    On May 9, 2011, ORISE conducted verification survey activities including scans, sampling, and the collection of smears of the remaining soils and off-gas pipe associated with the 802 Fan House within the HFBR (High Flux Beam Reactor) Complex at BNL. ORISE is of the opinion, based on independent scan and sample results obtained during verification activities at the HFBR 802 Fan House, that the FSS (final status survey) unit meets the applicable site cleanup objectives established for as left radiological conditions.

  14. Field testing of component-level model-based fault detection methods for mixing boxes and VAV fan systems

    E-Print Network [OSTI]

    Xu, Peng; Haves, Philip

    2002-01-01

    water-side fouling and valve leakage in the cooling coilin practice (e.g. , leakage of valves or dampers) and so

  15. Geomorphology and morphometric characteristics of alluvial fans, Guadalupe Mountains National Park and adjacent areas, west Texas and New Mexico 

    E-Print Network [OSTI]

    Given, Jeffrey Lyle

    2004-09-30

    , near the Last Glacial Maximum (LGM), that pluvial Lake King (to be discussed in section 2.6) occupied Salt Basin- Crow Flats (Wilkins and Currey, 1997). The late Pleistocene was characterized by a final period of minor uplift that displaced... of the Guadalupe Mountains Region... 20 7 Fault map of the Guadalupe and Brokeoff Mountains ............................ 21 8 Alluvial fans and bajada in Salt Basin-Crow Flats.................................. 22 9 Photograph of a drainage...

  16. Procedures of Second IFEES

    E-Print Network [OSTI]

    Fernandez, Eduardo

    , South Africa C Aligning Engineering Education Initiatives for a Knowledge Economy #12;Procedures for a Knowledge Economy Missing some logos Sponsored by: American Society of Engineering Education Hewlett Engineering Education Initiatives for a Knowledge Economy University of Cape Town, Cape Town, South Africa

  17. Characterization of dynamic change of Fan-delta reservoir properties in water-drive development

    SciTech Connect (OSTI)

    Wu Shenghe; Xiong Qihua; Liu Yuhong

    1997-08-01

    Fan-delta reservoir in Huzhuangji oil field of east China, is a typical highly heterogeneous reservoir. The oil field has been developed by water-drive for 10 years, but the oil recovery is less than 12%, and water cut is over 90%, resulting from high heterogeneity and serious dynamic change of reservoir properties. This paper aims at the study of dynamic change of reservoir properties in water-drive development. Through quantitative imaging analysis and mercury injection analysis of cores from inspection wells, the dynamic change of reservoir pore structure in water-drive development was studied. The results show that the {open_quotes}large pore channels{close_quotes} develop in distributary channel sandstone and become larger in water-drive development, resulting in more serious pore heterogeneity. Through reservoir sensitivity experiments, the rock-fluid reaction in water-drive development is studied. The results show the permeability of some distal bar sandstone and deserted channel sandstone becomes lower due to swelling of I/S clay minerals in pore throats. OD the other hand, the permeability of distributary channel and mouth bar sandstone become larger because the authigenic Koalinites in pore throats are flushed away with the increase of flow rate of injection water. Well-logging analysis of flooded reservoirs are used to study the dynamic change of reservoir properties in various flow units. The distribution of remaining oil is closely related to the types and distribution of flow units.

  18. Procedures for ground-water investigations

    SciTech Connect (OSTI)

    Not Available

    1989-09-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water investigations are carried out to fulfill the requirements for the US Department of Energy (DOE) to meet the requirements of DOE Orders. Investigations are also performed for various clients to meet the requirements of the Resource Conservation and Recovery Act of 1976 (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). National standards including procedures published by the American Society for Testing and Materials (ASTM) and the US Geological Survey were utilized in developing the procedures contained in this manual.

  19. Subsea HIPPS design procedure

    SciTech Connect (OSTI)

    Aaroe, R.; Lund, B.F.; Onshus, T.

    1995-12-31

    The paper is based on a feasibility study investigating the possibilities of using a HIPPS (High Integrity Pressure Protection System) to protect a subsea pipeline that is not rated for full wellhead shut-in pressure. The study was called the Subsea OPPS Feasibility Study, and was performed by SINTEF, Norway. Here, OPPS is an acronym for Overpressure Pipeline Protection System. A design procedure for a subsea HIPPS is described, based on the experience and knowledge gained through the ``Subsea OPPS Feasibility Study``. Before a subsea HIPPS can be applied, its technical feasibility, reliability and profitability must be demonstrated. The subsea HIPPS design procedure will help to organize and plan the design activities both with respect to development and verification of a subsea HIPPS. The paper also gives examples of how some of the discussed design steps were performed in the Subsea OPPS Feasibility Study. Finally, further work required to apply a subsea HIPPS is discussed.

  20. A Comprehensive Procedural Credentialing System / Curriculum for High Risk Procedures

    E-Print Network [OSTI]

    Ahmed, R.; Atkinson, S.; Hughes, P.; Cepeda, J.; Southern, A.; Jwayyed, S.

    2015-01-01

    procedural credentialing curriculum at a large academicprocedure credentialing curriculum is generalizable to otherprocess standardized the curriculum for residency programs

  1. Policy on Grievance Procedure Policy on Grievance Procedure

    E-Print Network [OSTI]

    Sridhar, Srinivas

    will be referred back to HRM. HRM will address the remaining issues, if any, through the Formal Review Procedure

  2. Issuance 2014-11-21:Energy Efficiency Program for Consumer Products: Energy Conservation Standards for Ceiling Fans: Availability of the Preliminary Technical Support Document, Notice of Comment Period Extension

    Broader source: Energy.gov [DOE]

    Energy Efficiency Program for Consumer Products: Energy Conservation Standards for Ceiling Fans: Availability of the Preliminary Technical Support Document, Notice of Comment Period Extension

  3. Economic recovery of oil trapped at fan margins using high angle wells and multiple hydraulic fractures. Quarterly report, Apr 1--June 30, 1997

    SciTech Connect (OSTI)

    Laue, M.L.

    1997-08-31

    This project attempts to demonstrate the effectiveness of exploiting thin-layered, low-energy deposits at the distal margin of a prograding turbidite complex through the use of hydraulically-fractured horizontal or high-angle wells. The combination of a horizontal or high-angle well and hydraulic fracturing will allow greater pay exposure than can be achieved with conventional vertical wells while maintaining vertical communication between thin interbedded layers and the wellbore. A high-angle well will be drilled in the fan-margin portion of a slope-basin clastic reservoir and will be completed with multiple hydraulic-fracture treatments. Geologic modeling, reservoir characterization, and fine-grid reservoir simulation will be used to select the well location and orientation. Design parameters for the hydraulic-fracture treatments will be determined, in part, by fracturing an existing test well. Fracture azimuth will be predicted by passive seismic monitoring of a fracture-stimulation treatment in the test well using logging tools in an offset well. The long radius, near-horizontal well has been drilled and completion operations are in progress. Upon initial review of log data, two hydraulic fracture treatments were planned. However, the probability of the lower frac growing into thick sands previously swept by waterflood has called for additional information to be obtained prior to proceeding with hydraulic fracture treatments. Should permeabilities prove to be as favorable as some data indicate, produced water volumes could be excessively high. Prior to pumping the first frac, the well will be perforated and produced from lower pay intervals. These perfs will not impact future frac work. Rate data and pressure transient analysis will dictate the need for the lower frac.

  4. Surface cleanliness measurement procedure

    DOE Patents [OSTI]

    Schroder, Mark Stewart (Hendersonville, NC); Woodmansee, Donald Ernest (Simpsonville, SC); Beadie, Douglas Frank (Greenville, SC)

    2002-01-01

    A procedure and tools for quantifying surface cleanliness are described. Cleanliness of a target surface is quantified by wiping a prescribed area of the surface with a flexible, bright white cloth swatch, preferably mounted on a special tool. The cloth picks up a substantial amount of any particulate surface contamination. The amount of contamination is determined by measuring the reflectivity loss of the cloth before and after wiping on the contaminated system and comparing that loss to a previous calibration with similar contamination. In the alternative, a visual comparison of the contaminated cloth to a contamination key provides an indication of the surface cleanliness.

  5. Advanced Vehicle Testing and Evaluation

    SciTech Connect (OSTI)

    Garetson, Thomas

    2013-03-31

    The objective of the United States (U.S.) Department of Energy?s (DOEs) Advanced Vehicle Testing and Evaluation (AVTE) project was to provide test and evaluation services for advanced technology vehicles, to establish a performance baseline, to determine vehicle reliability, and to evaluate vehicle operating costs in fleet operations. Vehicles tested include light and medium-duty vehicles in conventional, hybrid, and all-electric configurations using conventional and alternative fuels, including hydrogen in internal combustion engines. Vehicles were tested on closed tracks and chassis dynamometers, as well as operated on public roads, in fleet operations, and over prescribed routes. All testing was controlled by procedures developed specifically to support such testing. Testing and evaluations were conducted in the following phases: ? Development of test procedures, which established testing procedures; ? Baseline performance testing, which established a performance baseline; ? Accelerated reliability testing, which determined vehicle reliability; ? Fleet testing, used to evaluate vehicle economics in fleet operation, and ? End of test performance evaluation. Test results are reported by two means and posted by Idaho National Laboratory (INL) to their website: quarterly progress reports, used to document work in progress; and final test reports. This final report documents work conducted for the entirety of the contract by the Clarity Group, Inc., doing business as ECOtality North America (ECOtality). The contract was performed from 1 October 2005 through 31 March 2013. There were 113 light-duty on-road (95), off-road (3) and low speed (15) vehicles tested.

  6. Pompano subsea development -- Testing program

    SciTech Connect (OSTI)

    Nelson, R.; Berger, R.; Tyer, C.

    1996-12-31

    System reliability is essential for the economic success of any subsea oil and gas development. Testing programs can be developed to prove system reliability while still adhering to cost and schedule constraints. This paper describes a three-tiered equipment testing program that was employed for the Pompano Phase 2 subsea system. Program objectives, test descriptions, procedure development and test execution are discussed in detail. Lessons learned throughout the tests are also presented.

  7. Quality Assurance Procedures for ModCat Database Code Files

    SciTech Connect (OSTI)

    Siciliano, Edward R.; Devanathan, Ram; Guillen, Zoe C.; Kouzes, Richard T.; Schweppe, John E.

    2014-04-01

    The Quality Assurance procedures used for the initial phase of the Model Catalog Project were developed to attain two objectives, referred to as “basic functionality” and “visualization.” To ensure the Monte Carlo N-Particle model input files posted into the ModCat database meet those goals, all models considered as candidates for the database are tested, revised, and re-tested.

  8. ISDSN Sensor System Phase One Test Report

    SciTech Connect (OSTI)

    Gail Heath

    2011-09-01

    This Phase 1 Test Report documents the test activities and results completed for the Idaho National Laboratory (INL) sensor systems that will be deployed in the meso-scale test bed (MSTB) at Florida International University (FIU), as outlined in the ISDSN-MSTB Test Plan. This report captures the sensor system configuration tested; test parameters, testing procedure, any noted changes from the implementation plan, acquired test data sets, and processed results.

  9. Energy Performance Testing of Asetek's RackCDU System at NREL's High Performance Computing Data Center

    SciTech Connect (OSTI)

    Sickinger, D.; Van Geet, O.; Ravenscroft, C.

    2014-11-01

    In this study, we report on the first tests of Asetek's RackCDU direct-to-chip liquid cooling system for servers at NREL's ESIF data center. The system was simple to install on the existing servers and integrated directly into the data center's existing hydronics system. The focus of this study was to explore the total cooling energy savings and potential for waste-heat recovery of this warm-water liquid cooling system. RackCDU captured up to 64% of server heat into the liquid stream at an outlet temperature of 89 degrees F, and 48% at outlet temperatures approaching 100 degrees F. This system was designed to capture heat from the CPUs only, indicating a potential for increased heat capture if memory cooling was included. Reduced temperatures inside the servers caused all fans to reduce power to the lowest possible BIOS setting, indicating further energy savings potential if additional fan control is included. Preliminary studies manually reducing fan speed (and even removing fans) validated this potential savings but could not be optimized for these working servers. The Asetek direct-to-chip liquid cooling system has been in operation with users for 16 months with no necessary maintenance and no leaks.

  10. DEVELOPMENT AND TESTING OF HIGH POWER RF VECTOR MODULATORS*

    SciTech Connect (OSTI)

    Kang, Yoon W [ORNL; Wilson, Joshua L [ORNL; Champion, Mark [FNAL; Hardek, Thomas W [ORNL; Kim, Sang-Ho [ORNL; McCarthy, Mike [ORNL; Vassioutchenko, Alexandre V [ORNL

    2007-01-01

    A fan-out RF power distribution system can allow many accelerating cavities to be powered by a single high-power klystron amplifier. High-power vector modulators can perform independent control of amplitudes and phases of RF voltages at the cavities without changing the klystron signal. A prototype highpower RF vector modulator employing a quadrature hybrid and two ferrite phase shifters in coaxial TEM transmission lines has been built and tested for 402.5 MHz. RF properties of the design and results of high power testing are presented.

  11. POLICIES and PROCEDURES

    E-Print Network [OSTI]

    saerens

    2012-01-06

    Jan 6, 2012 ... In addition, international students must be tested for tuberculosis after .... Summer classes or first four week of Fall and Spring classes. .... graduate students but does not impact the above paid leave policy. Pay scales and tuition remission. The Department of Mathematics has a system of pay scale steps to ...

  12. FANNING OUT OF THE SOLAR f-MODE IN THE PRESENCE OF NON-UNIFORM MAGNETIC FIELDS?

    SciTech Connect (OSTI)

    Singh, Nishant K.; Brandenburg, Axel [Nordita, KTH Royal Institute of Technology and Stockholm University, Roslagstullsbacken 23, SE-10691 Stockholm (Sweden); Rheinhardt, Matthias, E-mail: nishant@nordita.org [Physics Department, Gustaf Hällströmin katu 2a, PO Box 64, FI-00014 University of Helsinki, Helsinki (Finland)

    2014-11-01

    We show that in the presence of a magnetic field that is varying harmonically in space, the fundamental mode, or f-mode, in a stratified layer is altered in such a way that it fans out in the diagnostic k? diagram, with mode power also within the fan. In our simulations, the surface is defined by a temperature and density jump in a piecewise isothermal layer. Unlike our previous work (Singh et al. 2014), where a uniform magnetic field was considered, here we employ a non-uniform magnetic field together with hydromagnetic turbulence at length scales much smaller than those of the magnetic field. The expansion of the f-mode is stronger for fields confined to the layer below the surface. In some of those cases, the k? diagram also reveals a new class of low-frequency vertical stripes at multiples of twice the horizontal wavenumber of the background magnetic field. We argue that the study of the f-mode expansion might be a new and sensitive tool to determine subsurface magnetic fields with azimuthal or other horizontal periodicity.

  13. Bell Tests for Histories

    E-Print Network [OSTI]

    Jodan Cotler; Frank Wilczek

    2015-03-22

    We describe a procedure to create entangled history states and measurements that would enable one to check for temporal entanglement. The checks take the form of inequalities among observable quantities. They are similar in spirit, but different in detail, to Bell tests for ordinary entanglement.

  14. Project Analysis Standard Operating Procedure

    Office of Environmental Management (EM)

    Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project...

  15. Functional Coverage Driven Test Generation for Validation of Pipelined Processors

    E-Print Network [OSTI]

    Mishra, Prabhat

    to define the functional coverage for pipelined architectures. Fi- nally, test generation procedures are presented that accept the graph model of the architecture as input and generate test pro- grams to detect of random or constrained-random test sequences. We have developed test generation procedures that accept

  16. Environmental Programs Procedure Preparation, Revision, Review...

    Energy Savers [EERE]

    Environmental Programs Procedure Preparation, Revision, Review, Approval, and Use Environmental Programs Procedure Preparation, Revision, Review, Approval, and Use The documents...

  17. Risk Management Policy and Procedures

    E-Print Network [OSTI]

    Paxton, Anthony T.

    Risk Management Policy and Procedures #12;Risk Management Policy and Procedures Queen's University Belfast Updated January 2014 1. PURPOSE OF THIS DOCUMENT 1.1 This Risk Management Policy (the policy explains the University's underlying approach to risk management, documents the roles and responsibilities

  18. ENERGY MANAGEMENT OPERATIONAL PROCEDURE MANUAL

    E-Print Network [OSTI]

    Harman, Neal.A.

    ENERGY MANAGEMENT OPERATIONAL PROCEDURE MANUAL Swansea University Estates Services Singleton Park Swansea SA2 8PP Tel 01792 295819 Fax 01792 295820 #12;Swansea University Energy Management Operational Procedural Manual Estates Services April 2008 rev 1 Created on 4/15/2008 4:23:00 PM - 2 - Contents 1. Energy

  19. Campus Safety Standard Operating Procedure

    E-Print Network [OSTI]

    Miami, University of

    /01/13 PURPOSE To establish policies and procedures for motor vehicle parking and operation on Rosenstiel School of Marine and Atmospheric Science Campus. POLICY All non-commercial vehicles parking on the RSMAS Campus in conflict with this procedure are revoked. 1.0 GENERAL 1.1 Motor vehicles are considered parked when stopped

  20. LOCKOUT/TAGOUT Policy & Procedure

    E-Print Network [OSTI]

    Berdichevsky, Victor

    LOCKOUT/TAGOUT Policy & Procedure Office of Environmental Health and Safety 5425 Woodward, Suite This procedure establishes the Wayne State University requirements for the lockout of energy isolating devices that employee's duties include performing service or maintenance covered under this section. Lockout

  1. Bonner Hall Building Evacuation Procedures

    E-Print Network [OSTI]

    Krovi, Venkat

    Bonner Hall Building Evacuation Procedures General Procedures: It is the personal responsibility of all occupants of University buildings to immediately exit the building when the fire alarm is activated. Remaining in the building is unacceptable, regardless of the reason. Occupants should exit from

  2. KETTER HALL BUILDING EVACUATION PROCEDURES

    E-Print Network [OSTI]

    Krovi, Venkat

    KETTER HALL BUILDING EVACUATION PROCEDURES General Procedures: It is the personal responsibility of all University buildings occupants to immediately exit the building when the fire alarm is activated. Remaining in the building is unacceptable, regardless of the reason. Occupants should exit from the closest

  3. Jarvis Hall Building Evacuation Procedures

    E-Print Network [OSTI]

    Krovi, Venkat

    Jarvis Hall Building Evacuation Procedures General Procedures: It is the personal responsibility of all occupants of University buildings to immediately exit the building when the fire alarm is activated. Remaining in the building is unacceptable, regardless of the reason. Occupants should exit from

  4. Furnas Hall Building Evacuation Procedures

    E-Print Network [OSTI]

    Krovi, Venkat

    Furnas Hall Building Evacuation Procedures General Procedures: It is the personal responsibility of all occupants of University buildings to immediately exit the building when the fire alarm is activated. Remaining in the building is unacceptable, regardless of the reason. Occupants should exit from

  5. Measurement of Turbulent Flame Speeds of Hydrogen and Natural Gas Blends (C1-C5 Alkanes) using a Newly Developed Fan-Stirred Vessel 

    E-Print Network [OSTI]

    Ravi, Sankaranarayana

    2014-05-06

    A fan-stirred flame speed vessel was developed at Texas A&M University to conduct turbulent combustion studies. Four high-speed impellers were installed in a central-symmetric pattern at the central circumference of an existing cylindrical laminar...

  6. Fan and Pad Greenhouse Evaporative Cooling Systems1 R. A. Bucklin, J. D. Leary, D. B. McConnell, and E. G. Wilkerson2

    E-Print Network [OSTI]

    Hill, Jeffrey E.

    CIR1135 Fan and Pad Greenhouse Evaporative Cooling Systems1 R. A. Bucklin, J. D. Leary, D. B. Mc systems. Such high temperatures reduce crop quality and worker productivity. Evaporative cooling temperatures are important when dealing with evaporative cooling systems ­ dry bulb temperature and wet bulb

  7. Groundwater Reactive Transport Models, 2012, 141-159 141 Fan Zhang, Gour-Tsyh (George) Yeh, Jack C. Parker and Xiaonan Shi (Eds)

    E-Print Network [OSTI]

    Mills, Richard

    Groundwater Reactive Transport Models, 2012, 141-159 141 Fan Zhang, Gour-Tsyh (George) Yeh, Jack C--simulating groundwater flow and solute transport, with basic chemical reactions such as aqueous complexing, mineral systems [1]. Although these simplified groundwater models are still in wide use, advances in subsurface

  8. Tunable Fresnel lens using nanoscale polymer-dispersed liquid crystals Hongwen Ren, Yun-Hsing Fan, and Shin-Tson Wua)

    E-Print Network [OSTI]

    Wu, Shin-Tson

    Tunable Fresnel lens using nanoscale polymer-dispersed liquid crystals Hongwen Ren, Yun-Hsing Fan May 2003; accepted 27 June 2003 An electrically tunable Fresnel zone plate lens is demonstrated using by voltage. The major advantages of such a Fresnel lens are simple fabrication, large aperture size

  9. Design for an inexpensive but effective cochlear implant BLAKES.WILSON,STEPHENREBSCHER,FAN-GANGZENG,ROBERTV.SHANNON,GERALDE.LOEB,DEWEYT.LAWSON,and

    E-Print Network [OSTI]

    Meng, Ellis

    monopolar electrodes. All implanted components are passive, reducing to a minimum the complexity(Rebscher),the University of California at San Francisco;the House Ear Institute (Zeng and Shannon);and the Bio Symposiumon Cochlear Implants and Linguistics,Zhengzhou,China,Oct.25-28, 1993. Reprintrequests:Fan-GangZeng,PhD,House

  10. Procedure for Performing In-Plane Membrane Conductivity Testing

    Broader source: Energy.gov [DOE]

    Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia

  11. Energy Conservation Program: Test Procedures for Commercial Prerinse...

    Energy Savers [EERE]

    commercial pre-rinse spray valves is an action issued by the Department of Energy. Though it is not intended or expected, should any discrepancy occur between the document posted...

  12. 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document. 2014-08-04...

  13. 2014-10-14 Issuance: Test Procedures Correction for Fluorescent...

    Office of Environmental Management (EM)

    Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document. 2014-10-14...

  14. 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration...

    Energy Savers [EERE]

    Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document. MREFTP...

  15. Standard-E hydrogen monitoring system shop acceptance test procedure

    SciTech Connect (OSTI)

    Schneider, T.C.

    1997-10-02

    The purpose of this report is to document that the Standard-E Hydrogen Monitoring Systems (SHMS-E), fabricated by Mid-Columbia Engineering (MCE) for installation on the Waste Tank Farms in the Hanford 200 Areas, are constructed as intended by the design. The ATP performance will verify proper system fabrication.

  16. 2014-10-14 Issuance: Test Procedures and Energy Conservation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document. 2014-10-14...

  17. Heavy Duty Powertrain System Optimization and Emissions Test Procedure Development

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  18. ENERGY STAR Test Procedures and Verification | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPL EnergyPlus, LLCConfidentiality Agreement3,RiverTree byEnergyin

  19. Ex Parte Communication on Central Air-Conditioner Test Procedure |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-inPPLfor InnovativeProcessing22, 2014 TheMonday March 3, 2014, a

  20. Argonne Facilitation of PHEV Standard Testing Procedure (SAE J1711) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels Research atDepartment of Energy Planning to BuyDepartment of

  1. Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n cEnergy (AZ,LocalEfficiency | Departmentcommercial pre-rinse

  2. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i pStateDOE Federal AviationSynchrophasor EngineeringofLegacyLaboratory

  3. Test Procedure Development and Revision | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyThe U.S.Laclede GasEfficiency Maine BusinessSmallsuccessTeryn Norris -

  4. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l De p u t y A s s iof1 of 8 2 of 8 3 of 8 4 of 8 5IceEquipment;

  5. 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l De p u t y A s s iof1 of 8 2 of 8 3 ofRule | Department

  6. Additional Guidance Regarding Application of Current Procedures for Testing

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n c i p a l De p u t y A s sconveyance(EPACT)SpringDOE during theEnergy

  7. J1634 SAE BEV Test Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURING OFFICE INDUSTRIALU.S. Department of(Presentation)Irving5: HowU N E 2 0 1 1 A

  8. DOE Launches Public Test Procedure Guidance Website | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based| Department ofRefrigerators |Department

  9. DOE Seeks Comment on Application of Clothes Washer Test Procedure |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based| Department8, 2015 GATEWAY Takes on Another1990, status:

  10. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based| Department8, 2015 GATEWAY Takes 9. TechnologyDOE Web

  11. Meeting Concerning Potential Test Procedures and Energy Conservation

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPAEnergy May 28 Webinar to Focus on7/15 1Regarding

  12. DOE Issues Final Appliance Test Procedure Rule | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergy A plug-in electric vehicle10nominate an

  13. Specified assurance level sampling procedure

    SciTech Connect (OSTI)

    Willner, O.

    1980-11-01

    In the nuclear industry design specifications for certain quality characteristics require that the final product be inspected by a sampling plan which can demonstrate product conformance to stated assurance levels. The Specified Assurance Level (SAL) Sampling Procedure has been developed to permit the direct selection of attribute sampling plans which can meet commonly used assurance levels. The SAL procedure contains sampling plans which yield the minimum sample size at stated assurance levels. The SAL procedure also provides sampling plans with acceptance numbers ranging from 0 to 10, thus, making available to the user a wide choice of plans all designed to comply with a stated assurance level.

  14. Review of International Methods of Test to Rate the Efficiency of Water Heaters

    E-Print Network [OSTI]

    Lutz, Jim

    2012-01-01

    associated with the EU water heater test procedure loadEU test procedure for water heaters. Load No. Delivered Max.period to allow the water heater to adjust completely to

  15. Surface Environmental Surveillance Procedures Manual

    SciTech Connect (OSTI)

    Hanf, RW; Dirkes, RL

    1990-02-01

    This manual establishes the procedures for the collection of environmental samples and the performance of radiation surveys and other field measurements. Responsibilities are defined for those personnel directly involved in the collection of samples and the performance of field measurements.

  16. Hazardous Materials Incident Response Procedure

    Broader source: Energy.gov [DOE]

    The purpose of this procedure is to provide guidance for developing an emergency response plan, as outlined in OSHA’s 29 CFR 1910.120(q), for facility response.  This model has been adopted and...

  17. POSTGRADUATE PROGRAMMES Procedures and Requirements

    E-Print Network [OSTI]

    Jagannatham, Aditya K.

    Engineering, Materials Science, Mechanical Engineering, Nuclear Engineering and Technology and Photonics Statistics), Mechanical Engineering, Nuclear Engineering and Technology, Photonics Science and Engineering(1) POSTGRADUATE PROGRAMMES Procedures and Requirements INDIAN INSTITUTE OF TECHNOLOGY KANPUR

  18. Forrestal Security and Safety Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1983-02-02

    To establish uniform procedures for the security and safety of the Forrestal Building and to inform all personnel of precautionary measures. This directive does not cancel another directive. Canceled by DOE N 251.11.

  19. Use of coiled tubing fans out among well sites of the world

    SciTech Connect (OSTI)

    Not Available

    1994-10-03

    Better operator understanding of coiled tubing improvements is generating a burst of applications at well sites around the world. Prompted by economics, producers are using coiled tubing in a wide range of well maintenance and remediation procedures to lower costs and increase recovery. Some more common workovers using coiled tubing--production tubing cleanouts and matrix acidizing, for example--not only are lowering costs but also are achieving better results. Other less known uses--logging, recompletions, and reentry drilling--until recently were thought unreliable or impossible. But better management of tubing fatigue, better materials, and larger tubing sizes are combining to boost producers' confidence in the relatively old technology. The paper describes coiled tubing opportunities, modeling fatigue, and then discusses some of its current applications.

  20. Micro-tensile testing system

    DOE Patents [OSTI]

    Wenski, Edward G.

    2006-01-10

    A micro-tensile testing system providing a stand-alone test platform for testing and reporting physical or engineering properties of test samples of materials having thicknesses of approximately between 0.002 inch and 0.030 inch, including, for example, LiGA engineered materials. The testing system is able to perform a variety of static, dynamic, and cyclic tests. The testing system includes a rigid frame and adjustable gripping supports to minimize measurement errors due to deflection or bending under load; serrated grips for securing the extremely small test sample; high-speed laser scan micrometers for obtaining accurate results; and test software for controlling the testing procedure and reporting results.

  1. Micro-tensile testing system

    DOE Patents [OSTI]

    Wenski, Edward G. (Lenexa, KS)

    2007-07-17

    A micro-tensile testing system providing a stand-alone test platform for testing and reporting physical or engineering properties of test samples of materials having thicknesses of approximately between 0.002 inch and 0.030 inch, including, for example, LiGA engineered materials. The testing system is able to perform a variety of static, dynamic, and cyclic tests. The testing system includes a rigid frame and adjustable gripping supports to minimize measurement errors due to deflection or bending under load; serrated grips for securing the extremely small test sample; high-speed laser scan micrometers for obtaining accurate results; and test software for controlling the testing procedure and reporting results.

  2. Micro-tensile testing system

    DOE Patents [OSTI]

    Wenski, Edward G. (Lenexa, KS)

    2007-08-21

    A micro-tensile testing system providing a stand-alone test platform for testing and reporting physical or engineering properties of test samples of materials having thicknesses of approximately between 0.002 inch and 0.030 inch, including, for example, LiGA engineered materials. The testing system is able to perform a variety of static, dynamic, and cyclic tests. The testing system includes a rigid frame and adjustable gripping supports to minimize measurement errors due to deflection or bending under load; serrated grips for securing the extremely small test sample; high-speed laser scan micrometers for obtaining accurate results; and test software for controlling the testing procedure and reporting results.

  3. Test Administration Instructions for the Fullerton Advanced Balance (FAB) Scale

    E-Print Network [OSTI]

    de Lijser, Peter

    Test Administration Instructions for the Fullerton Advanced Balance (FAB) Scale 1. Stand with feet: Stopwatch with lanyard (for placing around neck). Safety Procedures: Position person being tested n a corner at eye level so participant and time can be monitored simultaneously. Testing procedures: Demonstrate

  4. CC Pressure Test

    SciTech Connect (OSTI)

    Dixon, K.; /Fermilab

    1990-07-12

    The inner vessel heads including bypass and beam tubes had just been welded into place and dye penetrant checked. The vacuum heads were not on at this time but the vacuum shell was on covering the piping penetrating into the inner vessel. Signal boxes with all feed through boards, the instrumentation box, and high voltage boxes were all installed with their pump outs capped. All 1/4-inch instrumentation lines were terminated at their respective shutoff valves. All vacuum piping used for pumping down the inner vessel was isolated using o-ring sealed blind flanges. PV215A (VAT Series 12), the 4-inch VRC gate valve isolating the cyropump, and the rupture disk had to be removed and replaced with blind flanges before pressurizing due to their pressure limitations. Stresses in plates used as blind flanges were checked using Code calcualtions. Before the CC test, vacuum style blanks and clamps were hydrostatically pressure tested to 150% of the maximum test pressure, 60 psig. The Code inspector and Research Division Safety had all given their approval to the test pressure and procedure prior to filling the vessel with argon. The test was a major success. Based on the lack of any distinguishable pressure drop indicated on the pressure gages, the vessel appeared to be structurally sound throughout the duration of the test (approx. 3 hrs.). A major leak in the instrumentation tubing was discovered at half of the maximum test pressure and was quickly isolated by crimping and capping with a compression fitting. There were some slight deviations in the actual procedure used. The 44 psig relief valve located just outside the cleanroom had to be capped until the pressure in the vessel indicated 38 psi. This was to allow higher supply pressures and hence, higher flows through the pressurizing line. Also, in order to get pressure readings at the cryostat without exposing any personnel to the potentially dangerous stored energy near the maximum test pressure, a camera was installed at the top of the vessel to view the indicator mounted there. The monitor was viewed at the ante room adjacent to the cleanroom. The holding pressure of 32 psig (4/5 of the maximum test pressure) was only maintained for about 20 minutes instead of the half hour recommendation in the procedure. We felt that this was sufficient time to Snoop test and perform the pressure drop test. After the test was completed, the inspector for CBI Na-Con and the Research Divison Safety Officer signed all of required documentation.

  5. Cooperating Agencies in Implementing the Procedural Requirements...

    Energy Savers [EERE]

    Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Cooperating Agencies in Implementing the Procedural Requirements of the National...

  6. POLICY GUIDANCE MEMORANDUM #31 - Procedures for Regularizing...

    Office of Environmental Management (EM)

    1 - Procedures for Regularizing Illegal Appointments POLICY GUIDANCE MEMORANDUM 31 - Procedures for Regularizing Illegal Appointments As part of the Department's ongoing effort to...

  7. Economic recovery of oil trapped at fan margins using high angle wells and multiple hydraulic fractures. Annual report, September 28, 1995--September 27, 1996

    SciTech Connect (OSTI)

    Niemeyer, B.L.

    1997-09-01

    The digital fan margin in the northeast portion of the Yowlumne field contains significant reserves but is not economic to develop using verticle wells. Numerous interbedded shales and deteriorating rock properties limit producibility. In addition, extreme depths (13,000 ft) present a challenging environment for hydraulic fracturing and artificial lift. Lastly, a mature waterflood increases risk because of the uncertainty with size and location of flood fronts. This project attempts to demonstrate the effectiveness of exploiting the distal fan margin of this slope-basin clastic reservoir through the use of a high-angle well completed with multiple hydraulic-fracture treatments. The combination of a high-angle (or horizontal) well and hydraulic fracturing will allow greater pay exposure than can be achieved with conventional verticle wells while maintaining verticle communication between thin interbedded layers and the wellbore. The equivalent production rate and reserves of three verticle wells are anticipated at one-half to two-thirds the cost.

  8. Random sets and confidence procedures

    E-Print Network [OSTI]

    Barnett, William A.

    1979-06-01

    ) —* (Y, -T, (Qe)eee) be a random set with Y C ^ ( 0 ) - {0} and with Qe the probability distribution of S induced on Y by P0. Assume that S is surjective. The relation of statistical confidence sets to the following definition will be investigated... of confidence procedures now can be defined. DEFINITION 6. Let S be a confidence procedure. Then S has (lower) confidence level y — inl{Q6{ęe) \\ 6 ^ Q). If S is a confidence pro­ cedure, and if x E ST, then S(x) will be called a confidence subset of 0...

  9. Relay test program. Series 2 tests: Integral testing of relays and circuit breakers

    SciTech Connect (OSTI)

    Bandyopadhyay, K.K.; Kunkel, C.; Shteyngart, S. [Brookhaven National Lab., Upton, NY (United States)

    1994-02-01

    This report presents the results of a relay test program conducted by Brookhaven National Laboratory (BNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC). The program is a continuation of an earlier test program the results of which were published in NUREG/CR-4867. The current program was carried out in two phases: electrical testing and vibration testing. The objective was primarily to focus on the electrical discontinuity or continuity of relays and circuit breaker tripping mechanisms subjected to electrical pulses and vibration loads. The electrical testing was conducted by KEMA-Powertest Company and the vibration testing was performed at Wyle Laboratories, Huntsville, Alabama. This report discusses the test procedures, presents the test data, includes an analysis of the data and provides recommendations regarding reliable relay testing.

  10. Field Testing of Automated Demand Response for Integration of Renewable Resources in California's Ancillary Services Market for Regulation Products

    E-Print Network [OSTI]

    Kiliccote, Sila

    2013-01-01

    pumps and fans that are part of the facility loads. The wearpumps and fans that are part of the facility loads. The wear

  11. Measuring temperature-dependent propagating disturbances in coronal fan loops using multiple SDO/AIA channels and the surfing transform technique

    SciTech Connect (OSTI)

    Uritsky, Vadim M.; Ofman, Leon [Catholic University of America, Washington, D.C. 20064 (United States); Davila, Joseph M.; Viall, Nicholeen M. [NASA Goddard Space Flight Center, Greenbelt, MD 20771 (United States)

    2013-11-20

    A set of co-aligned high-resolution images from the Atmospheric Imaging Assembly (AIA) on board the Solar Dynamics Observatory is used to investigate propagating disturbances (PDs) in warm fan loops at the periphery of a non-flaring active region NOAA AR 11082. To measure PD speeds at multiple coronal temperatures, a new data analysis methodology is proposed enabling a quantitative description of subvisual coronal motions with low signal-to-noise ratios of the order of 0.1%. The technique operates with a set of one-dimensional 'surfing' signals extracted from position-time plots of several AIA channels through a modified version of Radon transform. The signals are used to evaluate a two-dimensional power spectral density distribution in the frequency-velocity space that exhibits a resonance in the presence of quasi-periodic PDs. By applying this analysis to the same fan loop structures observed in several AIA channels, we found that the traveling velocity of PDs increases with the temperature of the coronal plasma following the square-root dependence predicted for slow mode magneto-acoustic waves which seem to be the dominating wave mode in the loop structures studied. This result extends recent observations by Kiddie et al. to a more general class of fan loop system not associated with sunspots and demonstrating consistent slow mode activity in up to four AIA channels.

  12. Test Laboratory Instructions (Updated 2/12)

    E-Print Network [OSTI]

    Test Laboratory Instructions (Updated 2/12) In California, manufacturers of State- and federally Energy Commission (Energy Commission). This reported data must come from an approved test laboratory performing the test procedure prescribed by law for the appliance. These instructions will walk you through

  13. APPLICANT HANDBOOK A PROCEDURAL MANUAL

    E-Print Network [OSTI]

    Dennett, Daniel

    APPLICANT HANDBOOK A PROCEDURAL MANUAL FOR HEALTH PROFESSIONS STUDENTS Prepared by the Director and Associate Director for Health Professions Advising Tufts University 2015-16 Found online at http applies to other doctoral level health professions as well, but you should consult with Carol Baffi

  14. Supplemental Information EXTENDED EXPERIMENTAL PROCEDURES

    E-Print Network [OSTI]

    Ismagilov, Rustem F.

    Supplemental Information EXTENDED EXPERIMENTAL PROCEDURES Animals SPF C57Bl/6J mice and SPF Slc6a4/ml) was provided ad libitum in drinking water. For antibiotic treatment at P0, drinking water was supplemented immediately after collection and homogenized in grants buffered saline solution (GBSS) supplemented with 5

  15. Handbook of Academic Requirements & Procedures

    E-Print Network [OSTI]

    Kounaves, Samuel P.

    Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook must be used by all students who started during the Spring 2012 semester or later is a central activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

  16. Handbook of Academic Requirements & Procedures

    E-Print Network [OSTI]

    Kounaves, Samuel P.

    Handbook of Academic Requirements & Procedures for the Chemistry Graduate Program PLEASE NOTE: This version of the Handbook can be used by students who started during or before the Fall 2011 semester activity. 1.2 Purpose and Content of the Handbook. A detailed account of the academic requirements

  17. Handbook of Academic Requirements & Procedures

    E-Print Network [OSTI]

    Kounaves, Samuel P.

    Handbook of Academic Requirements & Procedures for the Chemistry/Biotechnology Graduate Program in which chemical/biotechnology research is a central activity. 1.2 Purpose and Content of the Handbook in this handbook should be addressed to the Chair of the joint Chemistry/Biotechnology Joint Graduate Commit

  18. Wireless Communications Device Policy & Procedures

    E-Print Network [OSTI]

    Wireless Communications Device Policy & Procedures Effective Date: October 1, 2012 Page 1 Revised staff eligibility for a wireless communication device b. Define the process for obtaining a wireless Wireless devices and plans will be provided by StFX for the following employees: 1. President, Vice

  19. EMERGENCY PROCEDURES QUICK REFERENCE GUIDE

    E-Print Network [OSTI]

    Frantz, Kyle J.

    1 EMERGENCY PROCEDURES QUICK REFERENCE GUIDE GSU EMERGENCY MANAGEMENT 404-413-0783 GSU POLICE: 404-413-3333 ATLANTA FIRE RESUCE: 911 #12;2 Emergency Response - Order of Priority In any emergency situation, Georgia infrastructure and facilities 3. Resume our research and educational programs Emergency Action Levels: A. Level 1

  20. MyUni Tests Tests.............................................................................................................................................. 2

    E-Print Network [OSTI]

    Balasuriya, Sanjeeva

    MyUni ­ Tests Tests.............................................................................................................................................. 2 Test question types.................................................................................................................... 2 Create a test

  1. Building America House Performance Analysis Procedures

    SciTech Connect (OSTI)

    Hendron, R.; Farrar-Nagy, S.; Anderson, R.; Judkoff, R.

    2001-10-29

    As the Building America Program has grown to include a large and diverse cross section of the home building industry, accurate and consistent analysis techniques have become more important to help all program partners as they perform design tradeoffs and calculate energy savings for prototype houses built as part of the program. This document illustrates some of the analysis concepts proven effective and reliable for analyzing the transient energy usage of advanced energy systems as well as entire houses. The analysis procedure described here provides a starting point for calculating energy savings of a prototype house relative to two base cases: builder standard practice and regional standard practice. Also provides building simulation analysis to calculate annual energy savings based on side-by-side short-term field testing of a prototype house.

  2. Standard Test Method for Sandwich Corrosion Test

    E-Print Network [OSTI]

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This test method defines the procedure for evaluating the corrosivity of aircraft maintenance chemicals, when present between faying surfaces (sandwich) of aluminum alloys commonly used for aircraft structures. This test method is intended to be used in the qualification and approval of compounds employed in aircraft maintenance operations. 1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information. 1.3 This standard may involve hazardous materials, operations, and equipment. This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. Specific hazard statements appear in Section 9.

  3. Conceptual and procedural understanding of algebra concepts in the middle grades 

    E-Print Network [OSTI]

    Joffrion, Heather Kyle

    2007-04-25

    ). One video taped lesson from each teacher was selected for in-depth analysis of the balance between conceptual teaching, procedural teaching, and classroom time that included neither. Student participants took pretest and posttest algebra tests...

  4. Thermal well-test method

    DOE Patents [OSTI]

    Tsang, Chin-Fu (Albany, CA); Doughty, Christine A. (Berkeley, CA)

    1985-01-01

    A well-test method involving injection of hot (or cold) water into a groundwater aquifer, or injecting cold water into a geothermal reservoir. By making temperature measurements at various depths in one or more observation wells, certain properties of the aquifer are determined. These properties, not obtainable from conventional well test procedures, include the permeability anisotropy, and layering in the aquifer, and in-situ thermal properties. The temperature measurements at various depths are obtained from thermistors mounted in the observation wells.

  5. Surface Environmental Surveillance Procedures Manual

    SciTech Connect (OSTI)

    RW Hanf; TM Poston

    2000-09-20

    Environmental surveillance data are used in assessing the impact of current and past site operations on human health and the environment, demonstrating compliance with applicable local, state, and federal environmental regulations, and verifying the adequacy of containment and effluent controls. SESP sampling schedules are reviewed, revised, and published each calendar year in the Hanford Site Environmental Surveillance Master Sampling Schedule. Environmental samples are collected by SESP staff in accordance with the approved sample collection procedures documented in this manual.

  6. Isolation Procedures for Farrowing Operations 

    E-Print Network [OSTI]

    Lawhorn, D. Bruce

    2002-01-31

    of herd disease. Once introduced, dis- eases such as Porcine Reproductive and Respiratory Syndrome (PRRS), pseudorabies (PRV), Actinobacillus Pleuropneumonia (APP) transmissible gastroenteritis (TGE) and swine dysentery may be very difficult and costly... these swine into the herd. Blood Testing Blood testing of isolated swine may prevent certain major diseases from entering the herd. PRRS, pseudorabies, APP, TGE, brucellosis and leptospirosis (L. pomona and L. bratislava) may be diagnosed through blood testing...

  7. Statistical Analysis of Transient Cycle Test Results in a 40 CFR Part 1065 Engine Dynamometer Test Cell

    Broader source: Energy.gov [DOE]

    Effects of "new" engine testing procedures (40 CFR Part 1065) with respect to repeatability of transient engine dynamometer tests were examined as well as the effects of calibration and measurement methods

  8. Procedures for Nuclear Physics Experiments

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Construction Phase (Users and Experimental Hall responsibility) Fabricate equipment to design. Test individual elements of the equipment to verify performance and operations...

  9. Syracuse Univesity Test Report On Uptake Factor Resulting From A Dropped Storage Container - Phase II

    SciTech Connect (OSTI)

    Gao, Zhi; Zhang, Jianshun S.

    2012-01-01

    Under certain circumstances, powder from an accidently dropped container can become airborne and inhaled by people nearby such as those who are moving the containers. The inhaled fine particles can deposit on respiratory tracts and lungs, causing asthma, lung cancer, and other acute respiratory illnesses and chronic symptoms. The objective of this study was to develop a standard procedure to measure the airborne concentrations of different size particles within the vicinity of a dropped container where a significant portion of the contained powder is ejected. Tungsten oxide (WO{sub 3}) was selected in this study to represent relatively heavy powders (7.16 g/cm3 specific gravity for WO{sub 3}). A typical can with the outer dimensions of 4.25” diameter and 4.875” tall was used as the container. The powder was dropped in two different configurations: 1) contained within a can covered by a lid that has a 0.25” diameter hole, and 2) contained within a can without a lid. The packing volume of the powder was 51.4 in3 (842.7 cm{sup 3}) and the target mass was 1936 g. The tests were carried out in a full-scale stainless steel environmental chamber with an interior volume of 852 ft3 (24.1 m3). The chamber system includes an internal recirculation loop with a rectangular air diffuser and 10 variable frequency drive fans to provide a typical room air recirculation flow pattern. Two air filters were installed in the chamber air supply duct and return duct to achieve the required low background particle concentration. The initial chamber air conditions were set at 70°F (± 5°F) and 50% (± 10%) RH. A supporting frame and releasing device were designed and built to trigger consistently the dropping of the can. The particle sampling inlet was placed 5 ft above the floor and 6 inches laterally away from the can’s falling path. Concentrations of particles between 0.5 ?m and 20 ?m were recorded in units of mass and number of particles per unit volume. The data acquisition rate was once every 2 seconds during the first 2 hours. A test procedure was developed and verified. A total of thirty two drop tests were performed, eight in Phase I and twenty four in Phase II, covering variations in dropping height (8 ft or 4 ft from the floor), room air movement (0.25-0.30 m/s or 0.10-0.15 m/s near the ceiling), landing scenario (on a flat plate or a block), and lid condition (Ľ” lid hole or no lid). There were ten tests with flat plate and Ľ” lid hole, ten tests with flat plate no lid and twelve tests with block no lid.

  10. AGEING PROCEDURES ON LITHIUM BATTERIES IN AN INTERNATIONAL COLLABORATION CONTEXT

    SciTech Connect (OSTI)

    Jeffrey R. Belt; Ira Bloom; Mario Conte; Fiorentino Valerio Conte; Kenji Morita; Tomohiko Ikeya; Jens Groot

    2010-11-01

    The widespread introduction of electrically-propelled vehicles is currently part of many political strategies and introduction plans. These new vehicles, ranging from limited (mild) hybrid to plug-in hybrid to fully-battery powered, will rely on a new class of advanced storage batteries, such as those based on lithium, to meet different technical and economical targets. The testing of these batteries to determine the performance and life in the various applications is a time-consuming and costly process that is not yet well developed. There are many examples of parallel testing activities that are poorly coordinated, for example, those in Europe, Japan and the US. These costs and efforts may be better leveraged through international collaboration, such as that possible within the framework of the International Energy Agency. Here, a new effort is under development that will establish standardized, accelerated testing procedures and will allow battery testing organizations to cooperate in the analysis of the resulting data. This paper reviews the present state-of-the-art in accelerated life testing in Europe, Japan and the US. The existing test procedures will be collected, compared and analyzed with the goal of international collaboration.

  11. Reduce completion fluid costs with on-site brine tests

    SciTech Connect (OSTI)

    Thomas, D.C.; Darlington, R.K.; Kinney, W.R.; Lowell, J.L.

    1982-09-01

    A newly developed field kit makes on-site brine completion fluid testing practical. Simple titration procedures are used to analyze brine for calcium, zinc, chloride and bromide with an accuracy and repeatability that compares favorably with expensive laboratory techniques. This article describes the field testing theory and details analytical procedures used.

  12. Testing Documentation with "Low-Tech" Simulation David G. Novick

    E-Print Network [OSTI]

    Novick, David G.

    procedures and their documentation, present an example of a low-tech simulation of a new aircraft cockpitTesting Documentation with "Low-Tech" Simulation David G. Novick European Institute of Cognitive@onecert.fr ABSTRACT This paper introduces low-tech simulation as a technique for testing procedures

  13. Ventilation System Effectiveness and Tested Indoor Air Quality Impacts

    SciTech Connect (OSTI)

    Rudd, A.; Bergey, D.

    2014-02-01

    Ventilation system effectiveness testing was conducted at two unoccupied, single-family, detached lab homes at the University of Texas - Tyler. Five ventilation system tests were conducted with various whole-building ventilation systems. Multizone fan pressurization testing characterized building and zone enclosure leakage. PFT testing showed multizone air change rates and interzonal airflow. Cumulative particle counts for six particle sizes, and formaldehyde and other Top 20 VOC concentrations were measured in multiple zones. The testing showed that single-point exhaust ventilation was inferior as a whole-house ventilation strategy. It was inferior because the source of outside air was not direct from outside, the ventilation air was not distributed, and no provision existed for air filtration. Indoor air recirculation by a central air distribution system can help improve the exhaust ventilation system by way of air mixing and filtration. In contrast, the supply and balanced ventilation systems showed that there is a significant benefit to drawing outside air from a known outside location, and filtering and distributing that air. Compared to the Exhaust systems, the CFIS and ERV systems showed better ventilation air distribution and lower concentrations of particulates, formaldehyde and other VOCs. System improvement percentages were estimated based on four System Factor Categories: Balance, Distribution, Outside Air Source, and Recirculation Filtration. Recommended System Factors could be applied to reduce ventilation fan airflow rates relative to ASHRAE Standard 62.2 to save energy and reduce moisture control risk in humid climates. HVAC energy savings were predicted to be 8-10%, or $50-$75/year.

  14. Ventilation System Effectiveness and Tested Indoor Air Quality Impacts

    SciTech Connect (OSTI)

    Rudd, Armin; Bergey, Daniel

    2014-02-01

    In this project, Building America research team Building Science Corporation tested the effectiveness of ventilation systems at two unoccupied, single-family, detached lab homes at the University of Texas - Tyler. Five ventilation system tests were conducted with various whole-building ventilation systems. Multizone fan pressurization testing characterized building and zone enclosure leakage. PFT testing showed multizone air change rates and interzonal airflow. Cumulative particle counts for six particle sizes, and formaldehyde and other Top 20 VOC concentrations were measured in multiple zones. The testing showed that single-point exhaust ventilation was inferior as a whole-house ventilation strategy. This was because the source of outside air was not direct from outside, the ventilation air was not distributed, and no provision existed for air filtration. Indoor air recirculation by a central air distribution system can help improve the exhaust ventilation system by way of air mixing and filtration. In contrast, the supply and balanced ventilation systems showed that there is a significant benefit to drawing outside air from a known outside location, and filtering and distributing that air. Compared to the exhaust systems, the CFIS and ERV systems showed better ventilation air distribution and lower concentrations of particulates, formaldehyde and other VOCs. System improvement percentages were estimated based on four system factor categories: balance, distribution, outside air source, and recirculation filtration. Recommended system factors could be applied to reduce ventilation fan airflow rates relative to ASHRAE Standard 62.2 to save energy and reduce moisture control risk in humid climates. HVAC energy savings were predicted to be 8-10%, or $50-$75/year.

  15. UNIVERSITY OF ABERDEEN RISK MANAGEMENT POLICY & PROCEDURES

    E-Print Network [OSTI]

    Neri, Peter

    UNIVERSITY OF ABERDEEN RISK MANAGEMENT POLICY & PROCEDURES 1 INTRODUCTION This document sets out the policy and procedures for risk management within the University and replaces earlier documentation. The risk management process is formally integrated with the University's strategic planning process

  16. POLICY: A:VPFA # / Purchasing Policy PROCEDURES

    E-Print Network [OSTI]

    Martin, Jeff

    POLICY: A:VPFA # / Purchasing Policy PROCEDURES: APPENDIX: Approved: April 1, 2013 Revised: Cross References: Purchasing Policy Capital Projects and Renovations Policy Conflict of Interest Policy Sustainability Policy Green Procurement Policy 1 of 9 PROCEDURES: Purchasing Policy AUTHORITY: University

  17. Using indicators in finite termination procedures

    SciTech Connect (OSTI)

    P. J. Williams; A. S. El-Bakry; R. W. Tapia

    1999-10-01

    The presence of bounded variables complicates finite termination procedures in interior-point methods for linear programming.

  18. Radiation Therapy Program Technical Standards Procedure

    E-Print Network [OSTI]

    MacMillan, Andrew

    Radiation Therapy Program Technical Standards Procedure Original Approval Date: October 27, 2014 of the Radiation Therapy Program. 1 #12;Radiation Therapy Program Technical Standards Procedure accurately observe, as well as competently and independently complete complex technical procedures in a reasonable amount

  19. Test Images

    E-Print Network [OSTI]

    Test Images. I hope to have a set of test images for the course soon. Some images are available now; some will have to wait until I can find another 100-200

  20. Meatiness Testing 

    E-Print Network [OSTI]

    Unknown

    2011-08-17

    The purpose of this research was to investigate the ignition phenomena of selected polymeric materials using the Hot Wire Ignition Test. This test is prescribed by Underwriters Laboratories as one of various requirements ...

  1. 2014-10-27 Issuance: Energy Conservation Standards for Ceiling Fan Light Kits; Notice of Public Meeting and Availability of the Preliminary Technical Support Document

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of public meeting and availability of the preliminary technical support document regarding energy conservation standards for ceiling fan light kits, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 27, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  2. 2014-09-16 Issuance: Energy Conservation Standards for Ceiling Fans; Notice of Public Meeting and Availability of Preliminary Technical Support Document

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of public meeting and availability of preliminary technical support document regarding energy conservation standards for ceiling fans, as issued by the Deputy Assistant Secretary on September 16, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  3. 2014-12-31 Issuance: Energy Conservation Standards for Commercial and Industrial Fans and Blowers; Extension of Comment Period for Notice of Data Availability

    Broader source: Energy.gov [DOE]

    This document is a pre-publication Federal Register extension of comment period for notice of data availability regarding energy conservation standards for commercial and industrial fans and blowers, as issued by the Deputy Assistant Secretary for Energy Efficiency on December 31, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  4. Whole-House Energy Analysis Procedures for Existing Homes: Preprint

    SciTech Connect (OSTI)

    Hendron, R.

    2006-08-01

    This paper describes a proposed set of guidelines for analyzing the energy savings achieved by a package of retrofits or an extensive rehabilitation of an existing home. It also describes certain field test and audit methods that can help establish accurate building system performance characteristics that are needed for a meaningful simulation of whole-house energy use. Several sets of default efficiency values have been developed for older appliances that cannot be easily tested and for which published specifications are not readily available. These proposed analysis procedures are documented more comprehensively in NREL Technical Report TP-550-38238.

  5. Verification Testing Test Driven Development Testing with JUnit Verification

    E-Print Network [OSTI]

    Peters, Dennis

    Verification Testing Test Driven Development Testing with JUnit Verification Any activity should be verified. #12;Verification Testing Test Driven Development Testing with JUnit Approaches to verification 1 Testing 2 Static Analysis · Peer review · Insepction/Walk-through/Structured review · Formal

  6. Automated robust test framework for electrical impedance tomography

    E-Print Network [OSTI]

    Adler, Andy

    impedance tomography (EIT) devices. The system is designed to calculate reliable, repeatable and accurate system by testing the overall effect of design changes. Test object Saline tank 9 g NaCl per liter H2 O 6. An automated test system and procedure is proposed, designed to enable systematic testing of electrical

  7. P:\\Policy & Procedures\\PP\\PP#15-Vehicle Fueling Procedure.doc Physical Plant

    E-Print Network [OSTI]

    Fernandez, Eduardo

    P:\\Policy & Procedures\\PP\\PP#15- Vehicle Fueling Procedure.doc Physical Plant Policy & Procedure #15 TITLE: VEHICLE FUELING PROCEDURE OBJECTIVE AND PURPOSE: This policy will detail the steps taken to provide fuel for University vehicles from the fuel dispensing site at the Campus Operations Building. (The

  8. Propagation testing multi-cell batteries.

    SciTech Connect (OSTI)

    Orendorff, Christopher J.; Lamb, Joshua; Steele, Leigh Anna Marie; Spangler, Scott Wilmer

    2014-10-01

    Propagation of single point or single cell failures in multi-cell batteries is a significant concern as batteries increase in scale for a variety of civilian and military applications. This report describes the procedure for testing failure propagation along with some representative test results to highlight the potential outcomes for different battery types and designs.

  9. Injectivity Testing for Vapour Dominated Feed Zones

    SciTech Connect (OSTI)

    Clotworthy, A.W.; Hingoyon, C.S.

    1995-01-01

    Wells with vapor dominated feed zones yield abnormal pressure data. This is caused by the condensation of vapor during water injection. A revised injectivity test procedure currently applied by PNOC at the Leyte Geothermal Power Project has improved the injectivity test results.

  10. HUMAN RELIABILITY ANALYSIS FOR COMPUTERIZED PROCEDURES

    SciTech Connect (OSTI)

    Ronald L. Boring; David I. Gertman; Katya Le Blanc

    2011-09-01

    This paper provides a characterization of human reliability analysis (HRA) issues for computerized procedures in nuclear power plant control rooms. It is beyond the scope of this paper to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper provides a review of HRA as applied to traditional paper-based procedures, followed by a discussion of what specific factors should additionally be considered in HRAs for computerized procedures. Performance shaping factors and failure modes unique to computerized procedures are highlighted. Since there is no definitive guide to HRA for paper-based procedures, this paper also serves to clarify the existing guidance on paper-based procedures before delving into the unique aspects of computerized procedures.

  11. Laboratory testing for enhanced undersea cable survivability

    SciTech Connect (OSTI)

    Stange, W.F.

    1983-01-01

    Examples of useful testing procedures with summaries of test results gleaned from years of cable testing experience illustrate how laboratory testing has identified failure modes, uncovered design deficiencies, characterized performance and supported system design for improved at-sea survivability. Repeated test results give insight into the performance capabilities and limitations of contemporary cables with metal and aramid strength members and demonstrate that successful at-sea performance invariably depends upon the effective mating of cable, attachment hardware and handling equipment. Analysis of the potentially high cost of cable failure at sea clearly demonstrates that it pays to test in the laboratory.

  12. Forrestal Garage Parking Procedures, Revised February 1, 2015...

    Office of Environmental Management (EM)

    Forrestal Garage Parking Procedures, Revised February 1, 2015 Forrestal Garage Parking Procedures, Revised February 1, 2015 Forrestal Garage Parking Procedures - The Forrestal...

  13. Attachment 1: Green Lease Policies and Procedures for Lease Acquisitio...

    Energy Savers [EERE]

    1: Green Lease Policies and Procedures for Lease Acquisition Attachment 1: Green Lease Policies and Procedures for Lease Acquisition PDF icon Green Lease Policies and Procedures...

  14. Simplified Space Conditioning in Low-Load Homes: Results from Pittsburgh, Pennsylvania, New Construction Unoccupied Test House

    SciTech Connect (OSTI)

    Poerschke, Andrew; Stecher, Dave

    2014-06-01

    Field testing was performed in a new construction unoccupied test house in Pittsburgh, PA. Four air-based heating, ventilation, and air conditioning distribution systems—a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, a system with transfer fans to the bedrooms, and a system with no ductwork to the bedrooms—were evaluated during heating, cooling, and midseason conditions. The relative ability of each system was assessed with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability, respectively.

  15. Simplified Space Conditioning in Low-Load Homes: Results from Pittsburgh, Pennsylvania, New Construction Unoccupied Test House

    SciTech Connect (OSTI)

    Poerschke, A.; Stecher, D.

    2014-06-01

    Field testing was performed in a new construction unoccupied test house in Pittsburgh, Pennsylvania. Four air-based heating, ventilation, and air conditioning distribution systems--a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, a system with transfer fans to the bedrooms, and a system with no ductwork to the bedrooms--were evaluated during heating, cooling, and midseason conditions. The relative ability of each system was assessed with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity and stability, respectively.

  16. The Development and Field Testing of a High Temperature Ceramic Recuperator 

    E-Print Network [OSTI]

    Childs, F. W.; Sohal, M. S.

    1986-01-01

    AND FIELD TESTING OF A HIGH TEMPERATURE CERAMIC RECUPERATOR* F. W. Childs and M. S. Sohal EG&G Idaho, Inc., Idaho Falls, Idaho ABSTRACT Under cost-shared funding with the U.S. Department of Energy and the Gas Research Institute, Ai... RECUPERATOR --(!)--- /' X H A GAS METALLICFLUE U RECUPERATOR 5 T FAN COMBUSTION AIR BLOWER TO BURNER +---..J 2.ooo o F / DILUTIOIIiI AIR COIIiITROL FOR: e'IOO?F METALLIC RECUpeRATOR LIMIT ezooo?F BURIIiIER LIMIT Figure 1. Hybrid...

  17. Duct Leakage Repeatability Testing

    SciTech Connect (OSTI)

    Walker, Iain; Sherman, Max

    2014-08-01

    The purpose of this report is to evaluate the repeatability of the three most significant measurement techniques for duct leakage using data from the literature and recently obtained field data. We will also briefly discuss the first two factors. The main question to be answered by this study is to determine if differences in the repeatability of these tests methods is sufficient to indicate that any of these methods is so poor that it should be excluded from consideration as an allowed procedure in codes and standards. The three duct leak measurement methods assessed in this report are the two duct pressurization methods that are commonly used by many practitioners and the DeltaQ technique. These are methods B, C and A, respectively of the ASTM E1554 standard. Although it would be useful to evaluate other duct leak test methods, this study focused on those test methods that are commonly used and are required in various test standards, such as BPI (2010), RESNET (2014), ASHRAE 62.2 (2013), California Title 24 (CEC 2012), DOE Weatherization and many other energy efficiency programs.

  18. Slimhole Handbook- Procedures and Recommendations for Slimhole...

    Open Energy Info (EERE)

    in Geothermal Exploration Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Slimhole Handbook- Procedures and Recommendations for Slimhole Drilling...

  19. Hazardous Material Packaging for Transport - Administrative Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1986-09-30

    To establ1sh administrative procedures for the certification and use of radioactive and other hazardous materials packaging by the Department of Energy (DOE).

  20. Transesterification: Laboratory Analytical Procedure (LAP) Van...

    Office of Scientific and Technical Information (OSTI)

    Wychen, S.; Laurens, L. M. L. 09 BIOMASS FUELS; 59 BASIC BIOLOGICAL SCIENCES BIOMASS; ALGAE; LABORATORY ANALYTICAL PROCEDURES; LAPS; TOTAL LIPIDS; FATTY ACID METHYL ESTERS; FAME;...

  1. Hanford Site Confined Space Procedure (HSCSP)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Health Regulations for Construction." 7.2 References 1. DOE-0336, Hanford Site LockoutTagout 2. DOE-0344, Hanford Site Excavation Trenching & Shoring Procedure 3. National...

  2. Export Authorizations - Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    - Procedures Part II, Section 202(e) of the Federal Power Act (FPA) states that exports of electric energy should be allowed unless the proposed export would impair the...

  3. Microsoft Word - EPRR_procedures_060115.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Environmental Services Standard Operating Procedure for Routine Validation of Dioxin Furan Analytical Data (EPA Method 1618 and SW-846 EPA Method 8290) SOP-5171 Waste and...

  4. Radiological Work Planning and Procedure

    SciTech Connect (OSTI)

    KURTZ, J.E.

    2000-01-01

    Each facility is tasked with maintaining personnel radiation exposure as low as reasonably achievable (ALARA). A continued effort is required to meet this goal by developing and implementing improvements to technical work documents (TWDs) and work performance. A review of selected TWDs from most facilities shows there is a need to incorporate more radiological control requirements into the TWD. The Radioactive Work Permit (RWP) provides a mechanism to place some of the requirements but does not provide all the information needed by the worker as he/she is accomplishing the steps of the TWD. Requiring the engineers, planners and procedure writers to put the radiological control requirements in the work steps would be very easy if all personnel had a strong background in radiological work planning and radiological controls. Unfortunately, many of these personnel do not have the background necessary to include these requirements without assistance by the Radiological Control organization at each facility. In addition, there seems to be confusion as to what should be and what should not be included in the TWD.

  5. Battery Test Manual For Plug-In Hybrid Electric Vehicles

    SciTech Connect (OSTI)

    Jeffrey R. Belt

    2010-12-01

    This battery test procedure manual was prepared for the United States Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), Vehicle Technologies Program. It is based on technical targets established for energy storage development projects aimed at meeting system level DOE goals for Plug-in Hybrid Electric Vehicles (PHEV). The specific procedures defined in this manual support the performance and life characterization of advanced battery devices under development for PHEV’s. However, it does share some methods described in the previously published battery test manual for power-assist hybrid electric vehicles. Due to the complexity of some of the procedures and supporting analysis, a revision including some modifications and clarifications of these procedures is expected. As in previous battery and capacitor test manuals, this version of the manual defines testing methods for full-size battery systems, along with provisions for scaling these tests for modules, cells or other subscale level devices.

  6. Battery Test Manual For Plug-In Hybrid Electric Vehicles

    SciTech Connect (OSTI)

    Jeffrey R. Belt

    2010-09-01

    This battery test procedure manual was prepared for the United States Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), Vehicle Technologies Program. It is based on technical targets established for energy storage development projects aimed at meeting system level DOE goals for Plug-in Hybrid Electric Vehicles (PHEV). The specific procedures defined in this manual support the performance and life characterization of advanced battery devices under development for PHEV’s. However, it does share some methods described in the previously published battery test manual for power-assist hybrid electric vehicles. Due to the complexity of some of the procedures and supporting analysis, a revision including some modifications and clarifications of these procedures is expected. As in previous battery and capacitor test manuals, this version of the manual defines testing methods for full-size battery systems, along with provisions for scaling these tests for modules, cells or other subscale level devices.

  7. Pollutant Assessments Group Procedures Manual: Volume 1, Administrative and support procedures

    SciTech Connect (OSTI)

    Not Available

    1992-03-01

    This manual describes procedures currently in use by the Pollutant Assessments Group. The manual is divided into two volumes: Volume 1 includes administrative and support procedures, and Volume 2 includes technical procedures. These procedures are revised in an ongoing process to incorporate new developments in hazardous waste assessment technology and changes in administrative policy. Format inconsistencies will be corrected in subsequent revisions of individual procedures. The purpose of the Pollutant Assessments Groups Procedures Manual is to provide a standardized set of procedures documenting in an auditable manner the activities performed by the Pollutant Assessments Group (PAG) of the Health and Safety Research Division (HASRD) of the Environmental Measurements and Applications Section (EMAS) at Oak Ridge National Laboratory (ORNL). The Procedures Manual ensures that the organizational, administrative, and technical activities of PAG conform properly to protocol outlined by funding organizations. This manual also ensures that the techniques and procedures used by PAG and other contractor personnel meet the requirements of applicable governmental, scientific, and industrial standards. The Procedures Manual is sufficiently comprehensive for use by PAG and contractor personnel in the planning, performance, and reporting of project activities and measurements. The Procedures Manual provides procedures for conducting field measurements and includes program planning, equipment operation, and quality assurance elements. Successive revisions of this manual will be archived in the PAG Document Control Department to facilitate tracking of the development of specific procedures.

  8. Test Comparability

    E-Print Network [OSTI]

    Keller, Christine; Shulenburger, David E.

    2010-01-01

    stream_size 3106 stream_content_type text/plain stream_name Test Comparability ChangeJuly (2).pdf.txt stream_source_info Test Comparability ChangeJuly (2).pdf.txt Content-Encoding UTF-8 Content-Type text/plain; charset=UTF-8... KU ScholarWorks | http://kuscholarworks.ku.edu Test Comparability 2010 by Christine Keller and David Shulenburger This work has been made available by the University of Kansas Libraries’ Office of Scholarly Communication and Copyright. Please share...

  9. Validation of Sanitation Procedures to Prevent the Cross Contact with Allergens During the Processing of Pork Products 

    E-Print Network [OSTI]

    Winkler, Dawna

    2010-10-12

    This study was conducted to develop and validate cleaning procedures for different processing equipment of varying complexity and to determine the efficacy of two different allergen tests. Following introduction of selected ...

  10. Thermal well-test method

    DOE Patents [OSTI]

    Tsang, C.F.; Doughty, C.A.

    1984-02-24

    A well-test method involving injection of hot (or cold) water into a groundwater aquifer, or injecting cold water into a geothermal reservoir is disclosed. By making temperature measurements at various depths in one or more observation wells, certain properties of the aquifer are determined. These properties, not obtainable from conventional well test procedures, include the permeability anisotropy, and layering in the aquifer, and in-situ thermal properties. The temperature measurements at various depths are obtained from thermistors mounted in the observation wells.

  11. Test Automation Ant JUnit Test Automation

    E-Print Network [OSTI]

    Mousavi, Mohammad

    Test Automation Ant JUnit Test Automation Mohammad Mousavi Eindhoven University of Technology, The Netherlands Software Testing 2012 Mousavi: Test Automation #12;Test Automation Ant JUnit Outline Test Automation Ant JUnit Mousavi: Test Automation #12;Test Automation Ant JUnit Why? Challenges of Manual Testing

  12. COLLEGE OF CHARLESTON POLICY AND PROCEDURE

    E-Print Network [OSTI]

    Kunkle, Tom

    COLLEGE OF CHARLESTON POLICY AND PROCEDURE Number & Title: Prepaid Expenses Originated: 4/or services are received and/or rendered. Procedure: A. Recording Prepaid Expenses ­ Payments of $750 or more for goods or services to be received in future accounting periods will be recorded as prepaid expenses

  13. Procedures for ground-water investigations

    SciTech Connect (OSTI)

    Not Available

    1992-12-01

    This manual was developed by the Pacific Northwest Laboratory (PNL) to document the procedures used to carry out and control the technical aspects of ground-water investigations at the PNL. Ground-water monitoring procedures are developed and used in accordance with the PNL Quality Assurance Program.

  14. WATER INTRUSION POLICY Procedure: 6.22

    E-Print Network [OSTI]

    Jia, Songtao

    WATER INTRUSION POLICY Procedure: 6.22 Version: 2.0 Effective: 6/28/2013 1 A. Purpose: 1. To prevent microbial amplification from water damage affecting the safety and comfort of area occupants. 2 in affected areas. 3. To describe a unified set of procedures for addressing water intrusions. B

  15. Safe Operating Procedure (Created 5/11)

    E-Print Network [OSTI]

    Tsymbal, Evgeny Y.

    ://ehs.unl.edu (5/11) LOCKOUT/TAGOUT FOR MACHINES & EQUIPMENT: WRITTEN PROCEDURES during maintenance and repair operations. In these situations, a lockout/tagout (LO/TO) program must/TO procedures, as well as other program requirements. See EHS SOP, Lockout/Tagout for Machines & Equipment

  16. CUNY EXPORT CONTROL PROCEDURES 11. Procurement

    E-Print Network [OSTI]

    Rosen, Jay

    CUNY EXPORT CONTROL PROCEDURES 11. Procurement This section addresses the identification of export to normal outbound export controls. Hence, it is CUNY's procedure to require vendors of laboratory to the laboratory user or administrator and the Export Control Administrator for the College. The Export Control

  17. POLICIES & PROCEDURES Legal Disclaimers for CSUN Internet

    E-Print Network [OSTI]

    Cohen, Randy W.

    POLICIES & PROCEDURES Legal Disclaimers for CSUN Internet Sites/Terms and Conditions of Use Policy on California State University, Northridge Internet sites. POLICY/PROCEDURES: The following legal disclaimers and Conditions of Use CSUN Internet Sites Endorsements General Liability Limitation of Liability Disclaimer

  18. Student Conduct Code Policies & Procedures 201415

    E-Print Network [OSTI]

    Mojzsis, Stephen J.

    Student Conduct Code Policies & Procedures 2014­15 #12;OFFICE OF STUDENT CONDUCT Student C0nduct Code Policies & Procedures 2014­15 Effective 8/25/2014 #12;A. Overview officials who are performing their duties. 13. Failing to abide by or complete a university sanction

  19. Texas Tech University Operating Policy and Procedure

    E-Print Network [OSTI]

    Rock, Chris

    OP 78.04 Texas Tech University Operating Policy and Procedure OP 78.04: Contractor Parking DATE and standardized procedures concerning contractor parking on the Texas Tech campus. REVIEW: This OP of Traffic & Parking Services, the Texas Tech project manager, and the contractor. a. The contractor

  20. Live Paint: Painting with Procedural Multiscale Textures

    E-Print Network [OSTI]

    Live Paint: Painting with Procedural Multiscale Textures Ken Perlin Media Research Laboratory´atica Pura e Aplicada Abstract We present actively procedural multiresolution paint textures. Tex- ture drawing tool that can be used in a multires- olution paint system. They provide a mechanism to generate

  1. Live Paint: Painting with Procedural Multiscale Textures

    E-Print Network [OSTI]

    de Figueiredo, Luiz Henrique

    Live Paint: Painting with Procedural Multiscale Textures (Expanded Version) Ken Perlin Media -- Instituto de Matemâ??atica Pura e Aplicada Abstract We present actively procedural multiresolution paint constitute a powerful drawing tool that can be used in a multires­ olution paint system. They provide

  2. Improving Best Air Conditioner Efficiency by 20-30% through a High Efficiency Fan and Diffuser Stage Coupled with an Evaporative Condenser Pre-Cooler

    SciTech Connect (OSTI)

    Parker, Danny S; Sherwin, John R; Raustad, Richard

    2014-04-10

    The Florida Solar Energy Center (FSEC) conducted a research project to improve the best residential air conditioner condenser technology currently available on the market by retrofitting a commercially-available unit with both a high efficiency fan system and an evaporative pre-cooler. The objective was to integrate these two concepts to achieve an ultra-efficient residential air conditioner design. The project produced a working prototype that was 30% more efficient compared to the best currently-available technologies; the peak the energy efficiency ratio (EER) was improved by 41%. Efficiency at the Air-Conditioning and Refrigeration Institute (ARI) standard B-condition which is used to estimate seasonal energy efficiency ratio (SEER), was raised from a nominal 21 Btu/Wh to 32 Btu/Wh.

  3. Sampling Point Compliance Tests for 325 Building at Set-Back Flow Conditions

    SciTech Connect (OSTI)

    Ballinger, Marcel Y.; Glissmeyer, John A.; Barnett, J. M.; Recknagle, Kurtis P.; Yokuda, Satoru T.

    2011-05-31

    The stack sampling system at the 325 Building (Radiochemical Processing Laboratory [RPL]) was constructed to comply with the American National Standards Institute’s (ANSI’s) Guide to Sampling Airborne Radioactive Materials in Nuclear Facilities (ANSI N13.1-1969). This standard provided prescriptive criteria for the location of radionuclide air-sampling systems. In 1999, the standard was revised (Sampling and Monitoring Releases of Airborne Radioactive Substances From the Stacks and Ducts of Nuclear Facilities [ANSI/Health Physics Society [HPS] 13.1-1999]) to provide performance-based criteria for the location of sampling systems. Testing was conducted for the 325 Building stack to determine whether the sampling system would meet the updated criteria for uniform air velocity and contaminant concentration in the revised ANSI/HPS 13.1-1999 standard under normal operating conditions (Smith et al. 2010). Measurement results were within criteria for all tests. Additional testing and modeling was performed to determine whether the sampling system would meet criteria under set-back flow conditions. This included measurements taken from a scale model with one-third of the exhaust flow and computer modeling of the system with two-thirds of the exhaust flow. This report documents the results of the set-back flow condition measurements and modeling. Tests performed included flow angularity, uniformity of velocity, gas concentration, and particle concentration across the duct at the sampling location. Results are within ANSI/HPS 13.1-1999 criteria for all tests. These tests are applicable for the 325 Building stack under set-back exhaust flow operating conditions (980 - 45,400 cubic feet per minute [cfm]) with one fan running. The modeling results show that criteria are met for all tests using a two-fan configuration exhaust (flow modeled at 104,000 cfm). Combined with the results from the earlier normal operating conditions, the ANSI/HPS 13.1-1999 criteria for all tests are met for all configurations: one, two, or three fans (normal).

  4. skip me skip me Testing ObjectOriented Software Using

    E-Print Network [OSTI]

    Offutt, Jeff

    skip me skip me #12; Testing Object­Oriented Software Using the Category­Partition Method A chal­ lenges and developers need to understand effec­ tive ways to test the software. Much previous work in testing OO software has focused on de­ veloping new techniques and procedures. We ask whether

  5. DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING

    E-Print Network [OSTI]

    DATE: NVLAP LAB CODE: INFORMATION TECHNOLOGY SECURITY TESTING TEST PROCEDURE SELECTION LIST/2014 Testing based on criteria in 45 CFR Part 170, Health Information Technology: Standards, Implementation to the Permanent Certification Program for Health Information Technology; Final Rule (September 4, 2012). Complete

  6. Double-shell tank integrity assessments ultrasonic test equipment performance test

    SciTech Connect (OSTI)

    Pfluger, D.C.

    1996-09-26

    A double-shell tank (DST) inspection (DSTI) system was performance tested over three months until August 1995 at Pittsburgh, Pennsylvania, completing a contract initiated in February 1993 to design, fabricate, and test an ultrasonic inspection system intended to provide ultrasonic test (UT) and visual data to determine the integrity of 28 DSTs at Hanford. The DSTs are approximately one-million-gallon underground radioactive-waste storage tanks. The test was performed in accordance with a procedure (Jensen 1995) that included requirements described in the contract specification (Pfluger 1995). This report documents the results of tests conducted to evaluate the performance of the DSTI system against the requirements of the contract specification. The test of the DSTI system also reflects the performance of qualified personnel and operating procedures.

  7. Testing Your Soil: How to Collect and Send Samples 

    E-Print Network [OSTI]

    Provin, Tony; Pitt, John L.

    2002-06-26

    Soil tests can be used to estimate the kinds and amounts of soil nutrients available to plants and as aids in determining fertilizer needs. This publication covers the three-step procedure for obtaining sample bags and instructions, collecting...

  8. Health Code Number (HCN) Development Procedure

    SciTech Connect (OSTI)

    Petrocchi, Rocky; Craig, Douglas K.; Bond, Jayne-Anne; Trott, Donna M.; Yu, Xiao-Ying

    2013-09-01

    This report provides the detailed description of health code numbers (HCNs) and the procedure of how each HCN is assigned. It contains many guidelines and rationales of HCNs. HCNs are used in the chemical mixture methodology (CMM), a method recommended by the department of energy (DOE) for assessing health effects as a result of exposures to airborne aerosols in an emergency. The procedure is a useful tool for proficient HCN code developers. Intense training and quality assurance with qualified HCN developers are required before an individual comprehends the procedure to develop HCNs for DOE.

  9. Verifying Test Hypotheses -HOL/TestGen Verifying Test Hypotheses -HOL/TestGen

    E-Print Network [OSTI]

    Verifying Test Hypotheses - HOL/TestGen Verifying Test Hypotheses - HOL/TestGen An Experiment in Test and Proof Thomas Malcher January 20, 2014 1 / 20 #12;Verifying Test Hypotheses - HOL/TestGen HOL/TestGen Outline Introduction Test Hypotheses HOL/TestGen - Demo Verifying Test Hypotheses Conclusion 2 / 20 #12

  10. VEHICLE OPERATING PROCEDURES DEPARTMENT OF BIOLOGICAL SCIENCE

    E-Print Network [OSTI]

    Ronquist, Fredrik

    VEHICLE OPERATING PROCEDURES DEPARTMENT OF BIOLOGICAL SCIENCE GENERAL INFORMATION Vehicles resposniblity and disciplinary action. Vehicles may be used by faculty or staff from other departments complete the vehicle usage agreement form certifying that they have a valid driver's license

  11. Practical Procedures for Auditing Industrial Boiler Plants 

    E-Print Network [OSTI]

    O'Neil, J. P.

    1980-01-01

    Industrial boiler plants are an area of opportunity in virtually every industry to save energy and reduce costs by using relatively simple, inexpensive auditing procedures. An energy audit consists of inspection, measurement, analysis...

  12. Safe Operating Procedure (Revised 12/11)

    E-Print Network [OSTI]

    Tsymbal, Evgeny Y.

    Safe Operating Procedure (Revised 12/11) AIR CONDITIONING & REFRIGERATION://ehs.unl.edu/) Refrigerants are used throughout UNL in equipment such as refrigerators and freezers, central air conditioning

  13. RESEARCH MISCONDUCT: POLICIES, DEFINITIONS AND PROCEDURES

    E-Print Network [OSTI]

    Oviedo, Néstor J.

    RESEARCH MISCONDUCT: POLICIES, DEFINITIONS AND PROCEDURES I. INTRODUCTION The purpose and principles for assessing allegations of research misconduct, conducting inquiries and investigations related to possible research misconduct and reporting the results to federal sponsors. This policy applies to all

  14. Athletic Training Admissions Procedures Truman State University

    E-Print Network [OSTI]

    Gering, Jon C.

    Athletic Training Admissions Procedures Truman State University Admission to the athletic training major is competitive and selective. Students interested in majoring in athletic training must complete Athletic Training as their major area of study on the University's application for admission

  15. DOE National Environmental Policy Act Implementing Procedures...

    Broader source: Energy.gov (indexed) [DOE]

    PART 1021 - NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES DEPARTMENT OF ENERGY Authority: 42 U.S.C. 7101 et seq.; 42 U.S.C. 4321 et seq.; 50 U.S.C. 2401 et seq. Subpart...

  16. Financial Policy and Procedures for Reimbursable Work

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-08-15

    The directive establishes Department-wide financial policy and procedural guidance applicable to performing reimbursable work for other Federal agencies and with non-Federal Government entities, including foreign and commercial entities, State, and political subdivisions.

  17. Emergency Procedures Harbour Centre Pullthenearestfirealarm,leave

    E-Print Network [OSTI]

    Kavanagh, Karen L.

    Emergency Procedures Harbour Centre Fire · Pullthenearestfirealarm,leave theareaandclosethedoor Emergencies and First Aid Major · Call 778 782 5252 state"Medical Emergency · Ensurecomputeristurnedoff · SecurityorOperationswillprovide pertinentinformation Weather Emergencies

  18. Tightening procedures for large diameter anchor bolts 

    E-Print Network [OSTI]

    Abraham, Ryan Charles

    1997-01-01

    judgment concerning how tight to tighten the nuts on the anchor bolt system. Recent bolt failures have raised concerns about nut tightening procedures. When the nuts of a double nut system are not tightened sufficiently, fatigue loading, and even impact...

  19. Procedures for sampling radium-contaminated soils

    SciTech Connect (OSTI)

    Fleischhauer, H.L.

    1985-10-01

    Two procedures for sampling the surface layer (0 to 15 centimeters) of radium-contaminated soil are recommended for use in remedial action projects. Both procedures adhere to the philosophy that soil samples should have constant geometry and constant volume in order to ensure uniformity. In the first procedure, a ''cookie cutter'' fashioned from pipe or steel plate, is driven to the desired depth by means of a slide hammer, and the sample extracted as a core or plug. The second procedure requires use of a template to outline the sampling area, from which the sample is obtained using a trowel or spoon. Sampling to the desired depth must then be performed incrementally. Selection of one procedure over the other is governed primarily by soil conditions, the cookie cutter being effective in nongravelly soils, and the template procedure appropriate for use in both gravelly and nongravelly soils. In any event, a minimum sample volume of 1000 cubic centimeters is recommended. The step-by-step procedures are accompanied by a description of the minimum requirements for sample documentation. Transport of the soil samples from the field is then addressed in a discussion of the federal regulations for shipping radioactive materials. Interpretation of those regulations, particularly in light of their application to remedial action soil-sampling programs, is provided in the form of guidance and suggested procedures. Due to the complex nature of the regulations, however, there is no guarantee that our interpretations of them are complete or entirely accurate. Preparation of soil samples for radium-226 analysis by means of gamma-ray spectroscopy is described.

  20. Comparing Two Types of Magnetically- Coupled Adjustable Speed Drives with Variable Frequency Drives in Pump and Fan Applications 

    E-Print Network [OSTI]

    Anderson, K. J.; Chvala, W. D.

    2003-01-01

    This paper presents the results from laboratory tests on MagnaDrive Corporations fixed-magnet magnetically-coupled adjustable speed drive (MC-ASD) and Coyote Electronics electromagnetic MC-ASD as compared to a typical variable frequency drive (VFD...