National Library of Energy BETA

Sample records for failed ac substation

  1. TRANSMISSION AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED...

    Office of Scientific and Technical Information (OSTI)

    AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED COST; CALCULATION METHODS; PLANNING; COST ESTIMATION; MATHEMATICAL MODELS The displacement or deferral of substation...

  2. PUREX new substation ATR

    SciTech Connect (OSTI)

    Nelson, D.E.

    1997-05-12

    This document is the acceptance test report (ATR) for the New PUREX Main and Minisubstations. It covers the factory and vendor acceptance and commissioning test reports. Reports are presented for the Main 5 kV substation building, the building fire system, switchgear, and vacuum breaker; the minisubstation control building and switch gear; commissioning test; electrical system and loads inspection; electrical utilities transformer and cable; and relay setting changes based on operational experience.

  3. Substation alarm multiplexing system (SAMS)

    SciTech Connect (OSTI)

    ElBadaly, H.; Gaughan, J.; Ward, G.; Amengual, S.

    1996-03-01

    This paper describes an on going R&D project to develop, design, install, and assess the field performance of an advanced substation alarm system. SAMS provides a highly fault-tolerant system for the reporting of equipment alarms. SAMS separates and identifies each of the multiple alarm contacts, transmits an alarm condition over existing substation two-wire system, and displays the alarm source, and its associated technical information, on a touch-screen monitor inside the substation control room, and a remote central location and on a hand held terminal which may be carried anywhere within the substation. SAMS is currently installed at the Sherman Creek substation in the Bronx for the purpose of a three month field evaluation.

  4. Supervisory Transmission Lines and Substation Maintenance Manager

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  5. A complete and normalized 61850 substation (Smart Grid Project...

    Open Energy Info (EERE)

    as a means to improve the design, maintenance and operation of the substation automation systems. Design a standard substation considering the existing and new solutions...

  6. Electrician - Foreman II (Transmission Lines & Substations) ...

    Broader source: Energy.gov (indexed) [DOE]

    Region Transmission Lines and Substation Maintenance (G5200) 615 S. 43rd Avenue Phoenix, AZ 85009 Duty Location is Page, AZ Find out more about living conditions at this...

  7. Modeling and Simulating Blast Effects on Electric Substations

    SciTech Connect (OSTI)

    Lyle G. Roybal; Robert F. Jeffers; Kent E. McGillivary; Tony D. Paul; Ryan Jacobson

    2009-05-01

    A software simulation tool was developed at the Idaho National Laboratory to estimate the fragility of electric substation components subject to an explosive blast. Damage caused by explosively driven fragments on a generic electric substation was estimated by using a ray-tracing technique to track and tabulate fragment impacts and penetrations of substation components. This technique is based on methods used for assessing vulnerability of military aircraft and ground vehicles to explosive blasts. An open-source rendering and ray-trace engine was used for geometric modeling and interactions between fragments and substation components. Semi-empirical material interactions models were used to calculate blast parameters and simulate high-velocity material interactions between explosively driven fragments and substation components. Finally, a Monte Carlo simulation was added to model the random nature of fragment generation allowing a skilled analyst to predict failure probabilities of substation components.

  8. Benefits of Using Mobile Transformers and Mobile Substations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and mobile substations (MTS) to rapidly restore electrical service to areas subjected to blackouts as a result of equipment failure, natural disasters, acts of terrorism, or war. ...

  9. Grizzly Substation Fiber Optics : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-02-01

    This notice announces BPA`s decision to construct, operate, and maintain the Grizzly Substation Fiber Optic Project (Project). This Project is part of a continuing effort by BPA to complete a regionwide upgrade of its existing telecommunications system. The US Forest Service and BPA jointly prepared the Grizzly Substation Fiber Optic Project Environmental Assessment (EA) (DOE/EA-1241) evaluating the potential environmental impacts of the Proposed Action, the Underground Installation Alternative, and the No Action Alternative. Based on the analysis in the EA, the US Forest Service and BPA have determined that the Proposed Action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI. The US Forest Service has separately issued a FONSI and Decision Notice authorizing BPA to construct, operate, and maintain the Project within the Crooked River National Grassland (Grassland).

  10. 351 Substation Demolition -- B Roll | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    351 Substation Demolition -- B Roll 351 Substation Demolition -- B Roll Addthis Description The U.S. Department of Energy (DOE) recently teamed with contractor Washington Closure Hanford to complete a major recycling effort during cleanup of the Hanford Site in southeastern Washington State.

  11. National SCADA Test Bed Substation Automation Evaluation Report (Technical

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report) | SciTech Connect National SCADA Test Bed Substation Automation Evaluation Report Citation Details In-Document Search Title: National SCADA Test Bed Substation Automation Evaluation Report × You are accessing a document from the Department of Energy's (DOE) SciTech Connect. This site is a product of DOE's Office of Scientific and Technical Information (OSTI) and is provided as a public service. Visit OSTI to utilize additional information resources in energy science and technology.

  12. Variable Voltage Substation Electric Fire and Emergency Response |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Variable Voltage Substation Electric Fire and Emergency Response Variable Voltage Substation Electric Fire and Emergency Response Question from Participant: My question is from an emergency response perspective. It was stated that it took ~ ½ for electricians to de-energize the electrical components before firefighters were allowed in to fight the fire. This delay causes more damage to equipment and potential propagation of the fire. Is there not a "master"

  13. EA-2013: Herbicide Application at Three Substations; Imperial County

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (California), Maricopa and Yuma Counties (Arizona) | Department of Energy 13: Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona) EA-2013: Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona) SUMMARY Western Area Power Administration (Western) and the Bureau of Land Management (BLM) are jointly preparing an EA that analyzes the potential environmental impacts of Western's

  14. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Larimer County, Colorado | Department of Energy 83: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado SUMMARY Western Area Power Administration (Western) - with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency - is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade

  15. Benefits of Using Mobile Transformers and Mobile Substations for Rapidly

    Energy Savers [EERE]

    Restoring Electrical Service: a Report to the United States Congress Pursuant to Section 1816 of the Energy Policy Act of 2005 (August 2006) | Department of Energy Using Mobile Transformers and Mobile Substations for Rapidly Restoring Electrical Service: a Report to the United States Congress Pursuant to Section 1816 of the Energy Policy Act of 2005 (August 2006) Benefits of Using Mobile Transformers and Mobile Substations for Rapidly Restoring Electrical Service: a Report to the United

  16. EA-2013: Herbicide Application at Three Substations; Imperial County

    Office of Environmental Management (EM)

    (California), Maricopa and Yuma Counties (Arizona) | Department of Energy 3: Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona) EA-2013: Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona) SUMMARY Western Area Power Administration (Western) and the Bureau of Land Management (BLM) prepared an EA that analyzes the potential environmental impacts of Western's proposed use of

  17. National SCADA Test Bed Substation Automation Evaluation Report

    SciTech Connect (OSTI)

    Kenneth Barnes; Briam Johnson

    2009-10-01

    Increased awareness of the potential for cyber attack has recently resulted in improved cyber security practices associated with the electrical power grid. However, the level of practical understanding and deployment of cyber security practices has not been evenly applied across all business sectors. Much of the focus has been centered on information technology business centers and control rooms. This report explores the current level of substation automation, communication, and cyber security protection deployed in electrical substations throughout existing utilities in the United States. This report documents the evaluation of substation automation implementation and associated vulnerabilities. This evaluation used research conducted by Newton-Evans Research Company for some of its observations and results. The Newton Evans Report aided in the determination of what is the state of substation automation in North American electric utilities. Idaho National Laboratory cyber security experts aided in the determination of what cyber vulnerabilities may pose a threat to electrical substations. This report includes cyber vulnerabilities as well as recommended mitigations. It also describes specific cyber issues found in typical substation automation configurations within the electric utility industry. The evaluation report was performed over a 5-month period starting in October 2008

  18. SAS Output

    U.S. Energy Information Administration (EIA) Indexed Site

    -- -- -- -- -- -- -- 1.00 1.00 Fire -- -- -- -- -- -- -- -- -- Vandalism, Terrorism, or Malicious Acts -- -- -- -- 2.00 -- -- -- 2.00 Failed AC Substation Equipment --...

  19. Workshop on user experience with gas-insulated substations

    SciTech Connect (OSTI)

    Graybill, H.W.

    1981-12-01

    There is widespread interest among American and Canadian utilities in the interchange of operating and maintenance experience with gas-insulated substations (GIS). Those utilities who do not yet have GIS on their systems are likewise interested in the operating experience of those who do. A two-day workshop on GIS was held in Portland, Oregon, on July 30 and 31, 1981. The first day of the workshop was open to users only, and the agenda for the day consisted of user presentations on the following subjects: GIS station design and layout; specification and acquisition of GIS equipment; installation and commissioning; and operation and maintenance. On the second day, manufacturers were invited to present their experience, status, and progress in recent developments and improvements. The session was concluded with a general discussion of experience, problems, etc. No formal written papers were presented. The highlights of each verbal presentation and of ensuing discussion are presented in this report.

  20. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  1. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  2. Puget Sound Area Electric Reliability Plan : Supplemental Environmental Analysis, Schultz Substation.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-04-01

    This document describes the purpose, function, and the environmental consequences of the proposed Schultz substation near Ellensburg, Washington. The affected environment is described in detail, including aerial survey photographs. The impacts on vegetation, fish and wildlife, soils, and water resources are described. (GHH)

  3. Origin of the failed ensemble average rule for the band gaps of disordered

    Office of Scientific and Technical Information (OSTI)

    nonisovalent semiconductor alloys (Journal Article) | DOE PAGES Origin of the failed ensemble average rule for the band gaps of disordered nonisovalent semiconductor alloys « Prev Next » Title: Origin of the failed ensemble average rule for the band gaps of disordered nonisovalent semiconductor alloys Authors: Ma, Jie ; Deng, Hui-Xiong ; Luo, Jun-Wei ; Wei, Su-Huai Publication Date: 2014-09-02 OSTI Identifier: 1180832 Grant/Contract Number: AC02-05CH11231; AC36-08GO28308 Type: Publisher's

  4. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado.

  5. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  6. ACS | Open Energy Information

    Open Energy Info (EERE)

    ACS Jump to: navigation, search Name: ACS Place: Madrid, Spain Zip: 28036 Sector: Solar Product: Madrid based construction company involved in the development of solar thermal...

  7. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  8. Holbrook Substation Superconductor Cable System, Long Island, New York Final Report

    SciTech Connect (OSTI)

    Maguire, James; McNamara, Joseph

    2010-06-25

    The LIPA Superconductor project broke ground on July 4, 2006, was first energized on April 22, 2008 (Earth Day) and was commissioned on June 25, 2008. Since commissioning, up until early March, 2009, there were numerous refrigeration events that impacted steady state operations. This led to the review of the alarms that were being generated and a rewrite of the program logic in order to decrease the hypersensitivity surrounding these alarms. The high temperature superconductor (HTS) cable was energized on March 5, 2009 and ran uninterrupted until a human error during a refrigeration system switchover knocked the cable out of the grid in early February 2010. The HTS cable was in the grid uninterrupted from March 5, 2009 to February 4, 2010. Although there have been refrigeration events (propagated mainly by voltage sags/surges) during this period, the system was able to automatically switch over from the primary to the backup refrigeration system without issue as required during this period. On February 4, 2010, when switching from the backup over to the primary refrigeration system, two rather than one liquid nitrogen pumps were started inadvertently by a human error (communication) causing an overpressure in the cable cooling line. This in turn activated the pressure relief valve located in the grounding substation. The cable was automatically taken out of the grid without any damage to the components or system as a result of signals sent from the AMSC control cabinet to the LIPA substation. The cable was switched back into the grid again on March 16, 2010 without incident and has been operational since that time. Since switching from the backup to the primary is not an automatic process, a recent improvement was added to the refrigeration operating system to allow remote commands to return the system from backup to primary cooling. This improvement makes the switching procedure quicker since travel to the site to perform this operation is no longer necessary and safer since it is now a programmed procedure versus the former written procedure that was still subject to human variation in the process.

  9. Model and simulation of a flywheel energy storage system at a utility substation using electro-magnetic transients programs

    SciTech Connect (OSTI)

    Weissbach, R.S.; Karady, G.G.; Farmer, R.G.

    1996-11-01

    A flywheel energy storage system for use as an uninterruptible power supply at a utility substation to replace electrochemical batteries has been modeled. The model is developed using the Electro-Magnetic Transients Program (EMTP). Models for the flywheel, permanent magnet (synchronous) motor/generator, rectifiers and inverter have been included. Transient response for loss of power and clearing of a short circuit fault, as well as variation of load voltage due to the flywheel spinning down, is presented.

  10. ACS Symposium Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    224th ACS National Meeting Division of Analytical Chemistry Symposium on Chemical Science Using Synchrotron Radiation Wednesday, August 21, 2002 Sheraton, Boston, MA This symposium...

  11. Rule Proposed to Prohibit Importation of Products that Fail to...

    Office of Environmental Management (EM)

    Proposed to Prohibit Importation of Products that Fail to Comply with DOE Energy Conservation Standards Rule Proposed to Prohibit Importation of Products that Fail to Comply with ...

  12. Rule Issued to Prohibit Importation of Products that Fail To...

    Office of Environmental Management (EM)

    Issued to Prohibit Importation of Products that Fail To Comply with Federal Energy Conservation Standards Rule Issued to Prohibit Importation of Products that Fail To Comply with ...

  13. Volume II solicitation package for solicitation no. 522887-5422 {open_quotes}site electrical replacements & substation{close_quotes} subproject: 69 KV substation

    SciTech Connect (OSTI)

    1991-05-03

    This solicitation is for the U.S. Department of Energy under Prime Contract No. DE-AC04-88-DP43495 with EG&G Mound Applied Technologies. Ohio Sales or Use taxes are not to be included in the proposal price. Applicable taxes due or owing to the State of Ohio will be paid by the buyer under Direct Payment Permit No. 98-002230. Refer to Form ML-2487, General Provisions, Article 24, {open_quotes}Federal, State & Local Taxes{close_quotes}. Sellers are advised that purchases of building and construction materials for incorporation into a structure or improvement to a real property which is accepted for ownership by the United States or one of its agencies are exempt from Ohio Sales and Use taxes. Unnecessarily elaborate brochures or other presentations beyond those sufficient to present a complete and effective response to this solicitation are not desired and may be construed as an indication of the seller`s lack of cost consciousness. Elaborate art work, expensive paper and binding, and expensive visual and other presentation aids are neither necessary nor wanted.

  14. Microfabricated AC impedance sensor

    DOE Patents [OSTI]

    Krulevitch, Peter; Ackler, Harold D.; Becker, Frederick; Boser, Bernhard E.; Eldredge, Adam B.; Fuller, Christopher K.; Gascoyne, Peter R. C.; Hamilton, Julie K.; Swierkowski, Stefan P.; Wang, Xiao-Bo

    2002-01-01

    A microfabricated instrument for detecting and identifying cells and other particles based on alternating current (AC) impedance measurements. The microfabricated AC impedance sensor includes two critical elements: 1) a microfluidic chip, preferably of glass substrates, having at least one microchannel therein and with electrodes patterned on both substrates, and 2) electrical circuits that connect to the electrodes on the microfluidic chip and detect signals associated with particles traveling down the microchannels. These circuits enable multiple AC impedance measurements of individual particles at high throughput rates with sufficient resolution to identify different particle and cell types as appropriate for environmental detection and clinical diagnostic applications.

  15. [PATCHED] python/2.7.4 gzip package fails

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PATCHED python2.7.4 gzip package fails PATCHED python2.7.4 gzip package fails September 24, 2013 by Doug Jacobsen The modules version of python (python2.7.4) had a bug in...

  16. AC Transit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AC Transit logo AC Transit (or the Alameda-Contra Costa Transit District) is based in ... includes 13 cities and adjacent unincorporated areas in Alameda and Contra Costa counties. ...

  17. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  18. AC/RF Superconductivity

    SciTech Connect (OSTI)

    Ciovati, Gianluigi

    2015-02-01

    This contribution provides a brief introduction to AC/RF superconductivity, with an emphasis on application to accelerators. The topics covered include the surface impedance of normal conductors and superconductors, the residual resistance, the field dependence of the surface resistance, and the superheating field.

  19. ETA-AC002

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Revision 2 Effective March 1, 1997 "Control of Test Conduct" Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC002 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and

  20. ETA-AC003

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Revision 2 Effective March 1, 1997 Preparation and Issuance of Test Reports Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC003 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and

  1. ETA-AC004

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Revision 2 Effective March 1, 1997 Review of Test Results Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC004 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0

  2. ETA-AC006

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Revision 2 Effective: March 1, 1997 Vehicle Verification Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: ______________ Donald B. Karner ETA-AC006 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0 Verification

  3. Type B Accident Investigation of the Serious Personal Injury while Doble Testing at the Western Area Power Administration Hayden Substation, May 19, 1999

    Broader source: Energy.gov [DOE]

    On May 19, 1999, at 10:31 a.m., four Western Area Power Administration (Western) employees were performing Doble testing on a circuit breaker at Hayden Substation in Routt County, Colorado. Three electricians were injured when the high-voltage lead (HVL) of the Doble test set encroached on the minimum approach distance to an energized part outside clearance boundaries, drawing arcing faults.

  4. AC Propulsion | Open Energy Information

    Open Energy Info (EERE)

    Inc. is a California Corporation founded in 1992 to develop, manufacture, and license system and component technology for electric vehicle drive systems. References: AC...

  5. AC resistance measuring instrument

    DOE Patents [OSTI]

    Hof, P.J.

    1983-10-04

    An auto-ranging AC resistance measuring instrument for remote measurement of the resistance of an electrical device or circuit connected to the instrument includes a signal generator which generates an AC excitation signal for application to a load, including the device and the transmission line, a monitoring circuit which provides a digitally encoded signal representing the voltage across the load, and a microprocessor which operates under program control to provide an auto-ranging function by which range resistance is connected in circuit with the load to limit the load voltage to an acceptable range for the instrument, and an auto-compensating function by which compensating capacitance is connected in shunt with the range resistance to compensate for the effects of line capacitance. After the auto-ranging and auto-compensation functions are complete, the microprocessor calculates the resistance of the load from the selected range resistance, the excitation signal, and the load voltage signal, and displays of the measured resistance on a digital display of the instrument. 8 figs.

  6. AC Resistance measuring instrument

    DOE Patents [OSTI]

    Hof, Peter J. (Richland, WA)

    1983-01-01

    An auto-ranging AC resistance measuring instrument for remote measurement of the resistance of an electrical device or circuit connected to the instrument includes a signal generator which generates an AC excitation signal for application to a load, including the device and the transmission line, a monitoring circuit which provides a digitally encoded signal representing the voltage across the load, and a microprocessor which operates under program control to provide an auto-ranging function by which range resistance is connected in circuit with the load to limit the load voltage to an acceptable range for the instrument, and an auto-compensating function by which compensating capacitance is connected in shunt with the range resistance to compensate for the effects of line capacitance. After the auto-ranging and auto-compensation functions are complete, the microprocessor calculates the resistance of the load from the selected range resistance, the excitation signal, and the load voltage signal, and displays of the measured resistance on a digital display of the instrument.

  7. Fail Safe Design for Large Capacity Lithium-ion Batteries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fail Safe Design for Large Capacity Lithium-ion Batteries NREL Commercialization & Tech Transfer Webinar March 27, 2011 Gi-Heon Kim gi-heon.kim@nrel.gov John Ireland, Kyu-Jin Lee,...

  8. Digital ac monitor

    DOE Patents [OSTI]

    Hart, George W. (Natick, MA); Kern, Jr., Edward C. (Lincoln, MA)

    1987-06-09

    An apparatus and method is provided for monitoring a plurality of analog ac circuits by sampling the voltage and current waveform in each circuit at predetermined intervals, converting the analog current and voltage samples to digital format, storing the digitized current and voltage samples and using the stored digitized current and voltage samples to calculate a variety of electrical parameters; some of which are derived from the stored samples. The non-derived quantities are repeatedly calculated and stored over many separate cycles then averaged. The derived quantities are then calculated at the end of an averaging period. This produces a more accurate reading, especially when averaging over a period in which the power varies over a wide dynamic range. Frequency is measured by timing three cycles of the voltage waveform using the upward zero crossover point as a starting point for a digital timer.

  9. Digital ac monitor

    DOE Patents [OSTI]

    Hart, G.W.; Kern, E.C. Jr.

    1987-06-09

    An apparatus and method is provided for monitoring a plurality of analog ac circuits by sampling the voltage and current waveform in each circuit at predetermined intervals, converting the analog current and voltage samples to digital format, storing the digitized current and voltage samples and using the stored digitized current and voltage samples to calculate a variety of electrical parameters; some of which are derived from the stored samples. The non-derived quantities are repeatedly calculated and stored over many separate cycles then averaged. The derived quantities are then calculated at the end of an averaging period. This produces a more accurate reading, especially when averaging over a period in which the power varies over a wide dynamic range. Frequency is measured by timing three cycles of the voltage waveform using the upward zero crossover point as a starting point for a digital timer. 24 figs.

  10. Ac traction gets on track

    SciTech Connect (OSTI)

    O`Connor, L.

    1995-09-01

    This article describes inverter-based ac traction systems which give freight locomotives greater adhesion, pulling power, and braking capacity. In the 1940s, dc traction replaced the steam engine as a source of train propulsion, and it has ruled the freight transportation industry ever since. But now, high-performance ac-traction systems, with their unprecedented levels of pulling power and adhesion, are becoming increasingly common on America`s freight railroads. In thousands of miles of demonstration tests, today`s ac-traction systems have outperformed traditional dc-motor driven systems. Major railroad companies are convinced enough of the benefits of ac traction to have integrated it into their freight locomotives.

  11. [PATCHED] python/2.7.4 gzip package fails

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    [PATCHED] python/2.7.4 gzip package fails [PATCHED] python/2.7.4 gzip package fails September 24, 2013 by Doug Jacobsen The modules version of python (python/2.7.4) had a bug in the default gzip python package. This was due to problems introduced in python 2.7.4 and fixed in python 2.7.5. Receiving a TypeError or structError upon opening and reading a gzip'ped file were the phenotypes of this bug. This has been corrected by installing the python 2.7.5 version of gzip.py into our python

  12. Solar Oven, Take One: FAIL | Department of Energy

    Energy Savers [EERE]

    Oven, Take One: FAIL Solar Oven, Take One: FAIL June 15, 2011 - 11:56am Addthis Our homemade solar oven. | Courtesy of Moon Choe Our homemade solar oven. | Courtesy of Moon Choe Moon Choe EERE Summer Intern The first time I ever saw solar cookers was on the news in the summer of 2009 (though that would make it their winter, as I was living in Chile at the time), as part of a development project in the north, which is mostly desert. I had no idea solar cookers were so markedly simple in all

  13. 1997RMxAC...6..151L

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RMxAC...6..151L 1997RMxAC...6..151L 1997RMxAC...6..151L

  14. Development of a low cost integrated 15 kW A.C. solar tracking sub-array for grid connected PV power system applications

    SciTech Connect (OSTI)

    Stern, M.; West, R.; Fourer, G.; Whalen, W.; Van Loo, M.; Duran, G.

    1997-02-01

    Utility Power Group has achieved a significant reduction in the installed cost of grid-connected PV systems. The two part technical approach focused on (1) The utilization of a large area factory assembled PV panel, and (2) The integration and packaging of all sub-array power conversion and control functions within a single factory produced enclosure. Eight engineering prototype 15kW ac single axis solar tracking sub-arrays were designed, fabricated, and installed at the Sacramento Municipal Utility District{close_quote}s Hedge Substation site in 1996 and are being evaluated for performance and reliability. A number of design enhancements will be implemented in 1997 and demonstrated by the field deployment and operation of over twenty advanced sub-array PV power systems. {copyright} {ital 1997 American Institute of Physics.}

  15. Review of Site Preparedness for Severe Natural Phenomena Events...

    Office of Environmental Management (EM)

    substations at the facilities, which reduce power to various AC voltages providing a dual loop power supply. In Idaho Falls, separate substations provide commercial power at...

  16. AC Solar Inc | Open Energy Information

    Open Energy Info (EERE)

    Solar Inc Jump to: navigation, search Logo: AC Solar Inc Name: AC Solar Inc Address: P.O. Box 128 Place: Florence, Colorado Zip: 81226 Region: Rockies Area Sector: Solar Product:...

  17. SAS Output

    U.S. Energy Information Administration (EIA) Indexed Site

    28.00 2.00 2.00 23.00 89.00 Fire 1.00 -- 1.00 1.00 3.00 -- -- 50.00 56.00 Vandalism, Terrorism, or Malicious Acts -- -- -- -- 7.00 -- -- -- 7.00 Failed AC Substation Equipment...

  18. Fail-Safe, Inexpensive Electrochemical Device Stack Design - Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Innovation Portal Fail-Safe, Inexpensive Electrochemical Device Stack Design Lawrence Berkeley National Laboratory Contact LBL About This Technology Technology Marketing SummaryCraig Jacobson, Steven Visco, and Lutgard DeJonghe have invented a robust and low cost electrochemical device stack system based on a modified segmented-cell-in-series design. In this invention a number of small cylindrical cell segments are in contact with a planar metallic interconnect sheet that electrically

  19. AC power | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AC power Subscribe to RSS - AC power The electricity that runs the Laboratory's experiments and facilities. "AC" stands for the alternating current that comes from large power stations. The term compares with "DC," for "direct current," which comes from sources like batteries. PPPL engineers design and build state-of-the-art controller for AC to DC converter that manages plasma in upgraded fusion machine The electric current that powers fusion experiments requires

  20. Simultaneous distribution of AC and DC power

    DOE Patents [OSTI]

    Polese, Luigi Gentile

    2015-09-15

    A system and method for the transport and distribution of both AC (alternating current) power and DC (direct current) power over wiring infrastructure normally used for distributing AC power only, for example, residential and/or commercial buildings' electrical wires is disclosed and taught. The system and method permits the combining of AC and DC power sources and the simultaneous distribution of the resulting power over the same wiring. At the utilization site a complementary device permits the separation of the DC power from the AC power and their reconstruction, for use in conventional AC-only and DC-only devices.

  1. Fail-safe storage rack for irradiated fuel rod assemblies

    DOE Patents [OSTI]

    Lewis, Donald R. (Pocatello, ID)

    1993-01-01

    A fail-safe storage rack is provided for interim storage of spent but radioactive nuclear fuel rod assemblies. The rack consists of a checkerboard array of substantially square, elongate receiving tubes fully enclosed by a double walled container, the outer wall of which is imperforate for liquid containment and the inner wall of which is provided with perforations for admitting moderator liquid flow to the elongate receiving tubes, the liquid serving to take up waste heat from the stored nuclear assemblies and dissipate same to the ambient liquid reservoir. A perforated cover sealing the rack facilitates cooling liquid entry and dissipation.

  2. Fail-safe storage rack for irradiated fuel rod assemblies

    DOE Patents [OSTI]

    Lewis, D.R.

    1993-03-23

    A fail-safe storage rack is provided for interim storage of spent but radioactive nuclear fuel rod assemblies. The rack consists of a checkerboard array of substantially square, elongate receiving tubes fully enclosed by a double walled container, the outer wall of which is imperforate for liquid containment and the inner wall of which is provided with perforations for admitting moderator liquid flow to the elongate receiving tubes, the liquid serving to take up waste heat from the stored nuclear assemblies and dissipate same to the ambient liquid reservoir. A perforated cover sealing the rack facilitates cooling liquid entry and dissipation.

  3. Fail Safe Design for Large Capacity Lithium-ion Batteries

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fail Safe Design for Large Capacity Lithium-ion Batteries NREL Commercialization & Tech Transfer Webinar March 27, 2011 Gi-Heon Kim gi-heon.kim@nrel.gov John Ireland, Kyu-Jin Lee, Ahmad Pesaran Kandler Smith kandler.smith@nrel.gov Source: A123 Source: GM NATIONAL RENEWABLE ENERGY LABORATORY Challenges for Large LIB Systems 2 * Li-ion batteries are flammable, require expensive manufacturing to reduce defects * Small-cell protection devices do not work for large systems * Difficult to detect

  4. Analysis of failed ramps during the RHIC FY09 run

    SciTech Connect (OSTI)

    Minty, M.

    2014-08-15

    The Relativistic Heavy Ion Collider (RHIC) is a versatile accelerator that supports operation with polarized protons of up to 250 GeV and ions with up to 100 GeV/nucleon. During any running period, various operating scenarios with different particle species, beam energies or accelerator optics are commissioned. In this report the beam commissioning periods for establishing full energy beams (ramp development periods) from the FY09 run are summarized and, for the purpose of motivating further developments, we analyze the reasons for all failed ramps.

  5. In situ repair of a failed compression fitting

    DOE Patents [OSTI]

    Wolbert, Ronald R. (McKees Rocks, PA); Jandrasits, Walter G. (Pittsburgh, PA)

    1986-01-01

    A method and apparatus for the in situ repair of a failed compression fitg is provided. Initially, a portion of a guide tube is inserted coaxially in the bore of the compression fitting and locked therein. A close fit dethreading device is then coaxially mounted on the guide tube to cut the threads from the fitting. Thereafter, the dethreading device and guide tube are removed and a new fitting is inserted onto the dethreaded fitting with the body of the new fitting overlaying the dethreaded portion. Finally, the main body of the new fitting is welded to the main body of the old fitting whereby a new threaded portion of the replacement fitting is precisely coaxial with the old threaded portion. If needed, a bushing is located on the dethreaded portion which is sized to fit snugly between the dethreaded portion and the new fitting. Preferably, the dethreading device includes a cutting tool which is moved incrementally in a radial direction whereby the threads are cut from the threaded portion of the failed fitting in increments.

  6. NONLINEAR MAGNETOHYDRODYNAMICS OF AC HELICITY INJECTION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NONLINEAR MAGNETOHYDRODYNAMICS OF AC HELICITY INJECTION by Fatima Ebrahimi A dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy (Physics) at the UNIVERSITY OF WISCONSIN-MADISON 2003 NONLINEAR MAGNETOHYDRODYNAMICS OF AC HELICITY INJECTION Fatima Ebrahimi Under the supervision of Professor Stewart C. Prager At the University of Wisconsin-Madison AC magnetic helicity injection is a technique to sustain current in plasmas in which the current

  7. Solar Electric Grid Integration - Advanced Concepts (SEGIS-AC...

    Energy Savers [EERE]

    Electric Grid Integration - Advanced Concepts (SEGIS-AC) Funding Opportunity Solar Electric Grid Integration - Advanced Concepts (SEGIS-AC) Funding Opportunity Through the Solar ...

  8. U-027: RSA Key Manager Appliance Session Logout Bug Fails to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROBLEM: RSA Key Manager Appliance Session Logout Bug Fails to Terminate Sessions. PLATFORM: RSA Key Manager Appliance 2.7 Service Pack 1 ABSTRACT: A remote authenticated...

  9. 7AC Technologies, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7AC Technologies, Inc. America's Next Top Energy Innovator Challenge 498 likes 7AC Technologies, Inc. National Renewable Energy Laboratory Air conditioning is a very large contributor to U.S. and world energy consumption. Heating and cooling costs for commercial and industrial buildings exceed 25 percent of U.S. primary energy consumption (cooling alone accounts for 4.5 Quads out of 40 Quads) and typically accounts for almost half of a building's operating costs. Air conditioning is also a

  10. Three phase AC motor controller

    DOE Patents [OSTI]

    Vuckovich, Michael (Elizabeth, PA); Wright, Maynard K. (Bethel Park, PA); Burkett, John P. (South Huntington Township, Westmoreland County, PA)

    1984-03-20

    A motor controller for a three phase AC motor (10) which is adapted to operate bidirectionally from signals received either from a computer (30) or a manual control (32). The controller is comprised of digital logic circuit means which implement a forward and reverse command signal channel (27, 29) for the application of power through the forward and reverse power switching relays (16, 18, 20, 22). The digital logic elements are cross coupled to prevent activation of both channels simultaneously and each includes a plugging circuit (65, 67) for stopping the motor upon the removal of control signal applied to one of the two channels (27, 29) for a direction of rotation desired. Each plugging circuit (65, 67) includes a one-shot pulse signal generator (88, 102) which outputs a single pulse signal of predetermined pulsewidth which is adapted to inhibit further operation of the application of power in the channel which is being activated and to apply a reversal command signal to the other channel which provides a reversed phase application of power to the motor for a period defined by the pulse-width output of the one-shot signal generator to plug the motor (10) which will then be inoperative until another rotational command signal is applied to either of the two channels.

  11. ACS National Meeting (San Diego, CA) - JCAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ACS National Meeting (San Diego, CA) ACS National Meeting (San Diego, CA) Sun, Mar 13, 2016 7:00am 07:00 Thu, Mar 17, 2016 5:00pm 17:00 San Diego Convention Center 111 W Harbor Dr San Diego, CA 92101 Harry Atwater, "Artificial Photosynthesis: Progress, Science Prospects and Technology Outlook" Abstract: The design of highly efficient, non-biological energy conversion system that generate fuels directly from sunlight, water and carbon dioxide is both a formidable challenge and an

  12. Allianz Climate Solutions ACS GmbH | Open Energy Information

    Open Energy Info (EERE)

    Allianz Climate Solutions ACS GmbH Jump to: navigation, search Name: Allianz Climate Solutions (ACS) GmbH Place: Munich, Germany Zip: 80802 Product: Munich-based subsidiary of...

  13. Fail-Safe Design for Large Capacity Li-Ion Battery Systems - Energy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Innovation Portal Find More Like This Return to Search Fail-Safe Design for Large Capacity Li-Ion Battery Systems National Renewable Energy Laboratory Contact NREL About This Technology Publications: PDF Document Publication Fail Safe Design for Large Capacity Lithium-ion Batteries.pdf (2,324 KB) Technology Marketing Summary Lithium-ion batteries (LIBs) are a promising candidate for energy storage of electric drive vehicles due to their high power and energy density. The total electric

  14. Rule Issued to Prohibit Importation of Products that Fail To Comply with

    Energy Savers [EERE]

    Federal Energy Conservation Standards | Department of Energy Issued to Prohibit Importation of Products that Fail To Comply with Federal Energy Conservation Standards Rule Issued to Prohibit Importation of Products that Fail To Comply with Federal Energy Conservation Standards July 12, 2013 - 4:08pm Addthis After collaborating with the Department of Energy and considering comments from stakeholders, the U.S. Customs and Border Protection ("CBP") and the U.S. Department of the

  15. Rule Proposed to Prohibit Importation of Products that Fail to Comply with

    Energy Savers [EERE]

    DOE Energy Conservation Standards | Department of Energy Proposed to Prohibit Importation of Products that Fail to Comply with DOE Energy Conservation Standards Rule Proposed to Prohibit Importation of Products that Fail to Comply with DOE Energy Conservation Standards March 30, 2012 - 10:45am Addthis This week, after extensive collaboration with the Department of Energy, U.S. Customs and Border Protection and the U.S. Department of the Treasury issued a notice of proposed rulemaking

  16. Five ENERGY STAR Room Air Conditioners Fail Testing | Department of Energy

    Office of Environmental Management (EM)

    Five ENERGY STAR Room Air Conditioners Fail Testing Five ENERGY STAR Room Air Conditioners Fail Testing August 22, 2011 - 2:00pm Addthis The U.S. Department of Energy's Office of Enforcement announced today that DOE testing has identified five Friedrich room air conditioners that do not meet the ENERGY STAR Program's energy efficiency requirements. DOE selected these models for testing as part of its ENERGY STAR Verification Testing Pilot Program. DOE tests revealed that ENERGY STAR-rated

  17. 7AC Technologies, Inc. | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    498 likes 7AC Technologies, Inc. National Renewable Energy Laboratory Air conditioning is a very large contributor to U.S. and world energy consumption. Heating and cooling costs for commercial and industrial buildings exceed 25 percent of U.S. primary energy consumption (cooling alone accounts for 4.5 Quads out of 40 Quads) and typically accounts for almost half of a building's operating costs. Air conditioning is also a significant cause of grid instability with cycling compressor motors

  18. Eco-AC - Energy Innovation Portal

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Building Energy Efficiency Building Energy Efficiency Find More Like This Return to Search Eco-AC National Renewable Energy Laboratory Contact NREL About This Technology Technology Marketing Summary Air conditioning of building spaces consumes large amounts of energy in the United States, drives electricity usage during peak electricity demand, and is the single largest user of electricity in U.S. buildings. Thus, reducing our nation's energy consumption requires innovative and cost-effective

  19. ETA-AC06 - Vehicle Verification

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Revision 0 Effective: March 23, 2001 Vehicle Verification Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: ______________ Donald B. Karner ETA-AC06 Revision 0 2 ©2001 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and Prerequisites 4 5.0 Verification

  20. Fail save shut off valve for filtering systems employing candle filters

    DOE Patents [OSTI]

    VanOsdol, John (Fairmont, WV)

    2006-01-03

    The invention relates to an apparatus that acts as a fail save shut off valve. More specifically, the invention relates to a fail save shut off valve that allows fluid flow during normal operational conditions, but prevents the flow of fluids in the event of system failure upstream that causes over-pressurization. The present invention is particularly well suited for use in conjunction with hot gas filtering systems, which utilize ceramic candle filters. Used in such a hot gas system the present invention stops the flow of hot gas and prevents any particulate laden gas from entering the clean side of the system.

  1. Fail Save Shut Off Valve for Filtering Systems Employing Candle Filters

    DOE Patents [OSTI]

    VanOsdol, John

    2006-01-03

    The invention relates to an apparatus that acts as a fail save shut off valve. More specifically, the invention relates to a fail save shut off valve that allows fluid flow during normal operational conditions, but prevents the flow of fluids in the event of system failure upstream that causes over-pressurization. The present invention is particularly well suited for use in conjunction with hot gas filtering systems, which utilize ceramic candle filters. Used in such a hot gas system the present invention stops the flow of hot gas and prevents any particulate laden gas from entering the clean side of the system.

  2. A/C Model Development and Validation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A/C Model Development and Validation A/C Model Development and Validation 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting PDF icon vss045_lustbader_2012_o.pdf More Documents & Publications A/C Model Development and Validation Vehicle Technologies Office Merit Review 2015: Vehicle Thermal Systems Modeling in Simulink LDV HVAC Model Development and Validation

  3. Scalable Heuristics for Planning, Placement and Sizing of Flexible AC

    Office of Scientific and Technical Information (OSTI)

    Transmission System Devices (Technical Report) | SciTech Connect Technical Report: Scalable Heuristics for Planning, Placement and Sizing of Flexible AC Transmission System Devices Citation Details In-Document Search Title: Scalable Heuristics for Planning, Placement and Sizing of Flexible AC Transmission System Devices Aiming to relieve transmission grid congestion and improve or extend feasibility domain of the operations, we build optimization heuristics, generalizing standard AC Optimal

  4. Light Absorption of Primary Organic Aerosol Paper Named ACS Editors...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Absorption of Primary Organic Aerosol Paper Named ACS Editors' Choice For original submission and image(s), see ARM Research Highlights http:www.arm.govsciencehighlights...

  5. Non-vanishing ponderomotive AC electrophoretic effect for particle trapping

    SciTech Connect (OSTI)

    Guan, Weihau; Park, Jae Hyun nmn; Krstic, Predrag S; Reed, Mark A

    2011-01-01

    We present here a study on overlooked aspects of alternating current (AC) electrokinetics AC electrophoretic (ACEP) phenomena. The dynamics of a particle with both polarizability and net charges in a non-uniform AC electric trapping field is investigated. It is found that either electrophoretic (EP) or dielectrophoretic (DEP) effects can dominate the trapping dynamics, depending on experimental conditions. A dimensionless parameter gamma is developed to predict the relative strength of EP and DEP effects in a quadrupole AC field. An ACEP trap is feasible for charged particles in salt-free or low salt concentration solutions. In contrast to DEP traps, an ACEP trap favors the downscaling of the particle size.

  6. Simultaneous distribution of AC and DC power - Energy Innovation...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    buildings has significant energy savings potential through the elimination of inverters necessary to convert DC source power into AC (Alternating Current) as well as the...

  7. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Third Evaluation Report This report describes operations at Alameda-Contra Costa Transit district for ...

  8. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Third Evaluation Report - Appendices This report describes operations at Alameda-Contra Costa Transit ...

  9. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Evaluation Results Alameda-Contra Costa Transit District (AC Transit) Fuel ... Report and Appendices Alameda-Contra Costa Transit District Fuel Cell Transit Buses: ...

  10. AC Transit Demos Three Prototype Fuel Cell Buses | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    More Documents & Publications Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Third Evaluation Report - Appendices Alameda-Contra Costa Transit District ...

  11. Electrostatic coalescence system with independent AC and DC hydrophilic electrodes

    DOE Patents [OSTI]

    Hovarongkura, A. David (Arlington, VA); Henry, Jr., Joseph D. (Morgantown, WV)

    1981-01-01

    An improved electrostatic coalescence system is provided in which independent AC and DC hydrophilic electrodes are employed to provide more complete dehydration of an oil emulsion. The AC field is produced between an AC electrode array and the water-oil interface wherein the AC electrode array is positioned parallel to the interface which acts as a grounded electrode. The emulsion is introduced into the AC field in an evenly distributed manner at the interface. The AC field promotes drop-drop and drop-interface coalescence of the water phase in the entering emulsion. The continuous oil phase passes upward through the perforated AC electrode array and enters a strong DC field produced between closely spaced DC electrodes in which small dispersed droplets of water entrained in the continuous phase are removed primarily by collection at hydrophilic DC electrodes. Large droplets of water collected by the electrodes migrate downward through the AC electrode array to the interface. All phase separation mechanisms are utilized to accomplish more complete phase separation.

  12. Fail-Safe Designs for Large Capacity Battery Systems - Energy Innovation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Portal 113495 Site Map Printable Version Share this resource About Search Categories (15) Advanced Materials Biomass and Biofuels Building Energy Efficiency Electricity Transmission Energy Analysis Energy Storage Geothermal Hydrogen and Fuel Cell Hydropower, Wave and Tidal Industrial Technologies Solar Photovoltaic Solar Thermal Startup America Vehicles and Fuels Wind Energy Partners (27) Visual Patent Search Success Stories Find More Like This Return to Search Fail-Safe Designs for Large

  13. NEW OBSERVATION OF FAILED FILAMENT ERUPTIONS: THE INFLUENCE OF ASYMMETRIC CORONAL BACKGROUND FIELDS ON SOLAR ERUPTIONS

    SciTech Connect (OSTI)

    Liu, Y.; Xu, Z.; Su, J.; Lin, H.; Shibata, K.; Kurokawa, H.

    2009-05-01

    Failed filament eruptions not associated with a coronal mass ejection (CME) have been observed and reported as evidence for solar coronal field confinement on erupting flux ropes. In those events, each filament eventually returns to its origin on the solar surface. In this Letter, a new observation of two failed filament eruptions is reported which indicates that the mass of a confined filament can be ejected to places far from the original filament channel. The jetlike mass motions in the two failed filament eruptions are thought to be due to the asymmetry of the background coronal magnetic fields with respect to the locations of the filament channels. The asymmetry of the coronal fields is confirmed by an extrapolation based on a potential field model. The obvious imbalance between the positive and negative magnetic flux (with a ratio of 1:3) in the bipolar active region is thought to be the direct cause of the formation of the asymmetric coronal fields. We think that the asymmetry of the background fields can not only influence the trajectories of ejecta, but also provide a relatively stronger confinement for flux rope eruptions than the symmetric background fields do.

  14. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Number DE-AC27-10RV15051 Modification 106 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 106 Replacement Pages (Total: 53, including this Cover Page)  Section B.1, Type of Contract - Items Being Acquired, Page B-8  Section H, Special Contract Requirements, Pages i, ii, and H-27  Section I, Contract Clauses, Pages I-1 thru I-48 222-S LAS&T Contract DE-AC27-10RV15051 Conformed thru Contract Modification No. 106 B-8 (e) OPTION PERIOD III: CLIN Number Description

  15. Contract DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    DE-AC04-94AL85000 Modification M508 Attachment 1 SECTION J APPENDIX C Special Bank Account Agreement (Updated Mod M271, M461, M497, M508) Intentionally left blank for Internet...

  16. Initial tests of an AC dipole for the Tevatron

    SciTech Connect (OSTI)

    Miyamoto, R.; Jansson, A.; Kopp, S.; Syphers, M.; /Fermilab

    2006-06-01

    The AC dipole is a device to diagnose transverse motions of a beam. It can achieve large-amplitude oscillations without two inevitable problems of conventional kicker/pinger magnets: decoherence and emittance growth. While not the first synchrotron to operate with an AC dipole, the Tevatron can now make use of its recently upgraded BPM system, providing unprecedented resolution for use with an AC dipole, to measure both linear and nonlinear properties of the accelerator. Plans are to provide AC dipole systems for both transverse degrees of freedom. Preliminary tests have been done using an audio power amplifier with an existing vertical pinger magnet, producing oscillation amplitudes up to 2{sigma} at 150 GeV. In this paper, we will present the configuration of this system. We also show the analysis of a first few data sets, including the direct measurement of beta functions at BPM locations.

  17. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Pages i and H-32 Section J, Attachment 7, Performance Evaluation and Measurement Plan, Page J-127 222-S LAS&T Contract No. DE-AC27-10RV15051 Conformed thru Contract...

  18. Contract DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    DE-AC04-94AL85000 Modification M508 Attachment 1 SECTION J APPENDIX C Special Bank Account Agreement (Updated Mod M271, M461, M497, M508) Intentionally left blank for Internet posting purposes

  19. Development of an AC Module System: Final Technical Report

    SciTech Connect (OSTI)

    Suparna Kadam; Miles Russell

    2012-06-15

    The GreenRay Inc. program focused on simplifying solar electricity and making it affordable and accessible to the mainstream population. This was accomplished by integrating a solar module, micro-inverter, mounting and monitoring into a reliable, 'plug and play' AC system for residential rooftops, offering the following advantages: (1) Reduced Cost: Reduction in installation labor with fewer components, faster mounting, faster wiring. (2) Maximized Energy Production: Each AC Module operates at its maximum, reducing overall losses from shading, mismatch, or module downtime. (3) Increased Safety. Electrical and fire safety experts agree that AC Modules have significant benefits, with no energized wiring or live connections during installation, maintenance or emergency conditions. (4) Simplified PV for a Broader Group of Installers. Dramatic simplification of design and installation of a solar power system, enabling faster and more efficient delivery of the product into the market through well-established, mainstream channels. This makes solar more accessible to the public. (5) Broadened the Rooftop Market: AC Modules enable solar for many homes that have shading, split roofs, or obstructions. In addition, due to the smaller building block size of 200W vs. 1000W, homeowners with budget limitations can start small and add to their systems over time. Through this DOE program GreenRay developed the all-in-one AC Module system with an integrated PV Module and microinverter, custom residential mounting and performance monitoring. Development efforts took the product from its initial concept, through prototypes, to a commercial product sold and deployed in the residential market. This pilot deployment has demonstrated the technical effectiveness of the AC Module system in meeting the needs and solving the problems of the residential market. While more expensive than the traditional central inverter systems at the pilot scale, the economics of AC Modules become more and more favorable as the product matures and is made in high volumes. GreenRay's early customers have been highly enthusiastic about the AC Module system benefits.

  20. AVTA: Aerovironment AC Level 2 Charging System Testing Results | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Aerovironment AC Level 2 Charging System Testing Results AVTA: Aerovironment AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes

  1. Diagnostics of the Fermilab Tevatron using an AC dipole

    SciTech Connect (OSTI)

    Miyamoto, Ryoichi; /Texas U.

    2008-08-01

    The Fermilab Tevatron is currently the world's highest energy colliding beam facility. Its counter-rotating proton and antiproton beams collide at 2 TeV center-of-mass. Delivery of such intense beam fluxes to experiments has required improved knowledge of the Tevatron's beam optical lattice. An oscillating dipole magnet, referred to as an AC dipole, is one of such a tool to non-destructively assess the optical properties of the synchrotron. We discusses development of an AC dipole system for the Tevatron, a fast-oscillating (f {approx} 20 kHz) dipole magnet which can be adiabatically turned on and off to establish sustained coherent oscillations of the beam particles without affecting the transverse emittance. By utilizing an existing magnet and a higher power audio amplifier, the cost of the Tevatron AC dipole system became relatively inexpensive. We discuss corrections which must be applied to the driven oscillation measurements to obtain the proper interpretation of beam optical parameters from AC dipole studies. After successful operations of the Tevatron AC dipole system, AC dipole systems, similar to that in the Tevatron, will be build for the CERN LHC. We present several measurements of linear optical parameters (beta function and phase advance) for the Tevatron, as well as studies of non-linear perturbations from sextupole and octupole elements.

  2. System and method for determining stator winding resistance in an AC motor using motor drives

    DOE Patents [OSTI]

    Lu, Bin; Habetler, Thomas G; Zhang, Pinjia

    2013-02-26

    A system and method for determining the stator winding resistance of AC motors is provided. The system includes an AC motor drive having an input connectable to an AC source and an output connectable to an input terminal of an AC motor, a pulse width modulation (PWM) converter having switches therein to control current flow and terminal voltages in the AC motor, and a control system connected to the PWM converter. The control system generates a command signal to cause the PWM converter to control an output of the AC motor drive corresponding to an input to the AC motor, selectively generates a modified command signal to cause the PWM converter to inject a DC signal into the output of the AC motor drive, and determines a stator winding resistance of the AC motor based on the DC signal of at least one of the voltage and current.

  3. Fail-Safe Design for Large Capacity Lithium-Ion Battery Systems

    SciTech Connect (OSTI)

    Kim, G. H.; Smith, K.; Ireland, J.; Pesaran, A.

    2012-07-15

    A fault leading to a thermal runaway in a lithium-ion battery is believed to grow over time from a latent defect. Significant efforts have been made to detect lithium-ion battery safety faults to proactively facilitate actions minimizing subsequent losses. Scaling up a battery greatly changes the thermal and electrical signals of a system developing a defect and its consequent behaviors during fault evolution. In a large-capacity system such as a battery for an electric vehicle, detecting a fault signal and confining the fault locally in the system are extremely challenging. This paper introduces a fail-safe design methodology for large-capacity lithium-ion battery systems. Analysis using an internal short circuit response model for multi-cell packs is presented that demonstrates the viability of the proposed concept for various design parameters and operating conditions. Locating a faulty cell in a multiple-cell module and determining the status of the fault's evolution can be achieved using signals easily measured from the electric terminals of the module. A methodology is introduced for electrical isolation of a faulty cell from the healthy cells in a system to prevent further electrical energy feed into the fault. Experimental demonstration is presented supporting the model results.

  4. Superconducting shielded core reactor with reduced AC losses

    DOE Patents [OSTI]

    Cha, Yung S.; Hull, John R.

    2006-04-04

    A superconducting shielded core reactor (SSCR) operates as a passive device for limiting excessive AC current in a circuit operating at a high power level under a fault condition such as shorting. The SSCR includes a ferromagnetic core which may be either closed or open (with an air gap) and extends into and through a superconducting tube or superconducting rings arranged in a stacked array. First and second series connected copper coils each disposed about a portion of the iron core are connected to the circuit to be protected and are respectively wound inside and outside of the superconducting tube or rings. A large impedance is inserted into the circuit by the core when the shielding capability of the superconducting arrangement is exceeded by the applied magnetic field generated by the two coils under a fault condition to limit the AC current in the circuit. The proposed SSCR also affords reduced AC loss compared to conventional SSCRs under continuous normal operation.

  5. Dynamically reassigning a connected node to a block of compute nodes for re-launching a failed job

    DOE Patents [OSTI]

    Budnik, Thomas A. (Rochester, MN); Knudson, Brant L. (Rochester, MN); Megerian, Mark G. (Rochester, MN); Miller, Samuel J. (Rochester, MN); Stockdell, William M. (Byron, MN)

    2012-03-20

    Methods, systems, and products for dynamically reassigning a connected node to a block of compute nodes for re-launching a failed job that include: identifying that a job failed to execute on the block of compute nodes because connectivity failed between a compute node assigned as at least one of the connected nodes for the block of compute nodes and its supporting I/O node; and re-launching the job, including selecting an alternative connected node that is actively coupled for data communications with an active I/O node; and assigning the alternative connected node as the connected node for the block of compute nodes running the re-launched job.

  6. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    01 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 101 Replacement Pages (Total: 148, including this Cover Page)  Section J - entire section - pages J-1 thru J-147 222-S LAS&T Contract No. DE-AC27-10RV15051 Conformed thru Contract Modification No. 101 J-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J LIST OF ATTACHMENTS Table of Contents ATTACHMENT 1: DOE DIRECTIVES APPLICABLE TO THE 222-S LAB ............................................... 2

  7. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Number DE-AC27-10RV15051 Modification 100 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 100 Replacement Pages (Total: 37, including this Cover Page)  Section B.1, Type of Contract - Items Being Acquired, Page B-i and B-1  Section G.1(d), Electronic Media for Reports/Plans/Documents, Page G-1  Section J, Attachment 1, DOE Directives Applicable to the 222-S Lab, Pages J-1 thru J-3  Section J, Attachment 4, Washington Department of Labor Wage Determination, Pages

  8. Contract Number DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Number DE-AC27-10RV15051 Modification 116 SF-30 Attachment Attachment DE-AC27-10RV15051 MODIFICATION 116 Replacement Pages (Total: 21, including this Cover Page)  Section J, Attachment 7, Performance Evaluation and Measurement Plan, Pages J-127 thru J-146 ¡ ¢ £ ¤ ¢ ¥ ¦ § ¨ ©       ¨    ¡ ¤ §  ¡  ! "  # #  § ¨ © $ ¨  % & '  (  ) § ¨ ©      0 ¨ ' 1 $ 1 

  9. AC Loss Analysis on the Superconducting Coupling Magnet in MICE

    SciTech Connect (OSTI)

    Wu, Hong; Wang, Li; Green, Michael; Li, LanKai; Xu, FengYu; Liu, XiaoKun; Jia, LinXinag

    2008-07-08

    A pair of coupling solenoids is used in MICE experiment to generate magnetic field which keeps the muons within the iris of thin RF cavity windows. The coupling solenoids have a 1.5-meter inner diameter and will produce 7.4 T peak magnetic field. Three types of AC losses in coupling solenoid are discussed. The affect of AC losses on the temperature distribution within the cold mass during charging and rapid discharging process is analyzed also. The analysis result will be further confirmed by the experiment of the prototype solenoid for coupling solenoid, which will be designed, fabricated and tested at ICST.

  10. WTP Contract Section F Contract No. DE-AC27-01RV14136 Conformed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Contract No. DE-AC27-01RV14136 Conformed Thru Modification No. A143 F - i SECTION F DELIVERIES OR PERFORMANCE WTP Contract Section F Contract No. DE-AC27-01RV14136 Conformed Thru...

  11. Docket No. EERE-2011-BT-NOA-0067 and RIN Number 1904-AC52 Ex...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and RIN Number 1904-AC52 Ex parte Communication Docket No. EERE-2011-BT-NOA-0067 and RIN Number 1904-AC52 Ex parte Communication This memorandum for the record provides a ...

  12. WTP Contract Section D Contract No. DE-AC27-01RV14136 Conformed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Contract No. DE-AC27-01RV14136 Conformed Thru Modification No. A143 D - i SECTION D PACKAGING AND MARKING WTP Contract Section D Contract No. DE-AC27-01RV14136 Conformed Thru...

  13. Midea Agrees to Pay $4.5M for Four Models that Fail to Meet Federal Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Standards | Department of Energy Midea Agrees to Pay $4.5M for Four Models that Fail to Meet Federal Energy Standards Midea Agrees to Pay $4.5M for Four Models that Fail to Meet Federal Energy Standards November 28, 2012 - 5:47pm Addthis Midea America Corp., Hefei Hualing Co., Ltd., and China Refrigeration Industry Co., Ltd. ("Midea")-all subsidiaries or affiliates of GD Midea Holding Co., Ltd.-agreed to pay $4,562,838 after admitting in a Compromise Agreement that one

  14. Mission Support Contract Contract No. DE-AC06-09RL14728 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC06-09RL14728 Section J Modification 108 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J Modification 108 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J Modification 108 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J Modification 108

  15. AC Losses in the MICE Channel Magnets -- Is This a Curse or aBlessing?

    SciTech Connect (OSTI)

    Green, M.A.; Wu, H.; Wang, L.; Kai, L.L.; Jia, L.X.; Yang, S.Q.

    2008-01-31

    This report discusses the AC losses in the MICE channelmagnets during magnet charging and discharging. This report talks aboutthe three types of AC losses in the MICE magnets; the hysteretic AC lossin the superconductor, the coupling AC loss in the superconductor and theeddy current AC loss in the magnet mandrel and support structure. AClosses increase the heat load at 4 K. The added heat load increases thetemperature of the second stage of the cooler. In addition, AC losscontributes to the temperature rise between the second stage cold headand the high field point of the magnet, which is usually close to themagnet hot spot. These are the curses of AC loss in the MICE magnet thatcan limit the rate at which the magnet can be charge or discharged. Ifone is willing to allow some of the helium that is around the magnet toboil away during a magnet charge or discharge, AC losses can become ablessing. The boil off helium from the AC losses can be used to cool theupper end of the HTS leads and the surrounding shield. The AC losses arepresented for all three types of MICE magnets. The AC loss temperaturedrops within the coupling magnet are presented as an example of how boththe curse and blessing of the AC losses can be combined.

  16. DE-AC05-06OR23100 Section H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AC05-06OR23100 Section H - Page 1 of 29 PART I - SCHEDULE SECTION H SPECIAL CONTRACT REQUIREMENTS H.1 CONSECUTIVE NUMBERING (MAY 1997)......................................................................... 4 H.2 MODIFICATION AUTHORITY (MAY 1997) ....................................................................... 4 H.3 OVERSIGHT OF CONTRACTOR (OCT 2004)..................................................................... 4 H.4 SMALL BUSINESS SUBCONTRACTING PLAN (SEPT

  17. On-Chip AC self-test controller

    DOE Patents [OSTI]

    Flanagan, John D.; Herring, Jay R.; Lo, Tin-Chee

    2009-09-29

    A system for performing AC self-test on an integrated circuit that includes a system clock for normal operation is provided. The system includes the system clock, self-test circuitry, a first and second test register to capture and launch test data in response to a sequence of data pulses, and a logic circuit to be tested. The self-test circuitry includes an AC self-test controller and a clock splitter. The clock splitter generates the sequence of data pulses including a long data capture pulse followed by an at speed data launch pulse and an at speed data capture pulse followed by a long data launch pulse. The at speed data launch pulse and the at speed data capture pulse are generated for a common cycle of the system clock.

  18. AVTA: Eaton AC Level 2 Charging System Testing Results

    Broader source: Energy.gov [DOE]

    The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing done on the Eaton AC Level 2 charging system for plug-in electric vehicles. This research was conducted by Idaho National Laboratory.

  19. Electric Transportation Applications All Rights Reserved ETA-AC001

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Revision 2 Effective March 1, 1997 Control, Close-out and Storage of Documentation Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC001 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation 3 4.0 Initial Conditions and

  20. Electric Transportation Applications All Rights Reserved ETA-AC005

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 Revision 2 Effective March 1, 1997 Training and Certification Requirements for Personnel Utilizing ETA Procedures Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: ______________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC005 Revision 2 2 ©1997 Electric Transportation Applications All Rights Reserved TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0

  1. Electric Transportation Applications All Rights Reserved ETA-AC007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Revision 1 Effective March 1, 1997 "Control of Measuring and Test Equipment (M&TE)" Prepared by Electric Transportation Applications Prepared by: _______________________________ Date:__________ Jude M. Clark Approved by: _________________________________________________ Date: _______________ Donald B. Karner Procedure ETA-AC007 Revision 1 ©1997 Electric Transportation Applications All Rights Reserved 2 TABLE OF CONTENTS 1.0 Objectives 3 2.0 Purpose 3 3.0 Documentation Support 3

  2. AC electrokinetic manipulation of selenium nanoparticles for potential nanosensor applications

    SciTech Connect (OSTI)

    Mahmoodi, Seyed Reza; Bayati, Marzieh; Hosseinirad, Somayeh; Foroumadi, Alireza; Gilani, Kambiz; Rezayat, Seyed Mahdi

    2013-03-15

    Highlights: ? Se nanoparticles were synthesized using a reverse-microemulsion process. ? AC osmotic fluid flow repulses the particles from electrode edges. ? Dielectrophoretic force attracts the particles to electrode edges. ? Dielectrophoresis electrode showed non-ohmic behavior. ? The device can potentially be used as a nanosensor. - Abstract: We report the AC electrokinetic behavior of selenium (Se) nanoparticles for electrical characterization and possible application as micro/nano devices. selenium Se nanoparticles were successfully synthesized using a reverse-microemulsion process and investigated structurally using X-ray diffraction and transmission electron microscope. Interdigitated castellated ITO and non-castellated platinum electrodes were employed for manipulation of suspended materials in the fluid. Using ITO electrodes at low frequency limits resulted in deposition of Se particles on electrode surface. When Se particles exposed to platinum electrodes in the 10 Hz1 kHz range and V {sub p?p}> 8, AC osmotic fluid flow repulses the particles from electrode edges. However, in 10 kHz10 MHz range and V {sub p?p}> 5, dielectrophoretic force attracts the particles to electrode edges. As the Se particle concentration increased, the trapped Se particles were aligned along the electric field line and bridged the electrode gap. The device was characterized and can potentially be useful in making micro/nano electronic devices.

  3. System and method for determining stator winding resistance in an AC motor

    DOE Patents [OSTI]

    Lu, Bin (Kenosha, WI); Habetler, Thomas G. (Snellville, GA); Zhang, Pinjia (Atlanta, GA); Theisen, Peter J. (West Bend, WI)

    2011-05-31

    A system and method for determining stator winding resistance in an AC motor is disclosed. The system includes a circuit having an input connectable to an AC source and an output connectable to an input terminal of an AC motor. The circuit includes at least one contactor and at least one switch to control current flow and terminal voltages in the AC motor. The system also includes a controller connected to the circuit and configured to modify a switching time of the at least one switch to create a DC component in an output of the system corresponding to an input to the AC motor and determine a stator winding resistance of the AC motor based on the injected DC component of the voltage and current.

  4. Low-temperature transport in ac-driven quantum dots in the Kondo regime

    SciTech Connect (OSTI)

    Lopez, Rosa; Aguado, Ramon; Platero, Gloria; Tejedor, Carlos

    2001-08-15

    We present a fully nonequilibrium calculation of the low-temperature transport properties of a quantum dot in the Kondo regime when an ac potential is applied to the gate. We solve a time-dependent Anderson model with finite on-site Coulomb interaction. The interaction self-energy is calculated up to second order in perturbation theory in the on-site interaction, in the context of the Keldysh nonequilibrium technique, and the effect of the ac voltage is taken into account exactly for all ranges of ac frequencies and ac intensities. The obtained linear conductance and time-averaged density of states of the quantum dot evolve in a nontrivial way as a function of the ac frequency and ac intensity of the harmonic modulation.

  5. Dielectric response of multiwalled carbon nanotubes as a function of applied ac-electric fields

    SciTech Connect (OSTI)

    Basu, Rajratan; Iannacchione, Germano S.

    2008-12-01

    The complex dielectric constant ({epsilon}{sup *}) is reported for multiwalled carbon nanotubes (MWCNTs) up to 10{sup 5} Hz as a function of ac-electric field amplitudes E{sub rot} (in phase and same frequency as the measurement) and E{sub ac} (different phase and fixed frequency with respect to the measurement). A slow relaxation process (mode 1) is observed, which shifts to higher frequency with increasing E{sub rot} but is independent of E{sub ac}. A fast relaxation process (mode 2) is also observed, which is independent of E{sub rot} but shifts to higher frequency with increasing E{sub ac} (opposite to that of mode 1). An ac-conductivity analysis of MWCNT reveals insights on how E{sub rot} and E{sub ac} influence the dissipation.

  6. Mission Support Contract Section J Contract No. DE-AC06-09RL14728

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section J Contract No. DE-AC06-09RL14728 J-5-1 ATTACHMENT J-5 PERFORMANCE GUARANTEE AGREEMENT Modification 479 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-2 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-3 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-4 Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-5-5 Section J Modification 479 Mission Support Contract Contract No. DE-AC06-09RL14728 Section J

  7. Programmable AC power supply for simulating power transient expected in fusion reactor

    SciTech Connect (OSTI)

    Halimi, B.; Suh, K. Y.

    2012-07-01

    This paper focus on control engineering of the programmable AC power source which has capability to simulate power transient expected in fusion reactor. To generate the programmable power source, AC-AC power electronics converter is adopted to control the power of a set of heaters to represent the transient phenomena of heat exchangers or heat sources of a fusion reactor. The International Thermonuclear Experimental Reactor (ITER) plasma operation scenario is used as the basic reference for producing this transient power source. (authors)

  8. 222-S LAS&T Contract No. DE-AC27-10RV15051 Conformed...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC27-10RV15051 Conformed thru Initial Award i PART I - THE SCHEDULE SECTION D - PACKAGING AND MARKING TABLE OF CONTENTS D.1 PACKAGING ......

  9. The War of the Currents: AC vs. DC Power | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Power Company decided to award Westinghouse -- who had licensed Tesla's polyphase AC induction motor patent -- the contract to generate power from Niagara Falls. Although some...

  10. EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California

    Broader source: Energy.gov [DOE]

    The Department of the Interior’s Bureau of Indian Affairs considered preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency. This project has been canceled.

  11. Current Obsession: AC/DC | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Current Obsession: AC/DC Sarah Wagoner Sarah Wagoner Communications Specialist, Wind and Water Power Technologies Office Though humans have been harnessing water to perform work for thousands of years, the evolution of modern hydropower began in the late 1800's-coincidentally at the same time that Thomas Edison and Nikola Tesla were embroiled in a battle now known as the War of the Currents. Edison developed direct current (DC)-current that runs continually in a single direction-like in a

  12. DE-AC06-97RL13184

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC06-97RL13184 Modification 160 G-3 U. S. Department of Energy U.S. Department of Energy Richland Operations Office Richland Operations Office Assistant Manager for the Procurement Division River Corridor attn: Russell Walter, MSIN A7-80 Attn: D.J. Ortiz, MSIN A3-04 P.O. Box 550 P.O. Box 550 Richland, WA 99352 Richland, WA 99352 (One Copy) (One Copy) U. S. Department of Energy Oak Ridge Operations Office Oak Ridge Financial Service Center 200 Administration Road Oak Ridge, TN 37830 (One Copy)

  13. Contract DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract DE-AC27-08RV14800 Modification 105 SF30 Continuation Page, Block 14 Page 2 of 22 Purpose of Modification: The purpose of this modification is to do the following: 1. Definitize the contract Change Order issued in modification 084 to implement the removal of the Californium Sources. The addition of this new requirement increases the cost of CLIN 1 by $298,254 and increases fee in the amount of $26,843, for a total increase in contract value of $325,097. 2. Update Section J, Attachment

  14. Contract No. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    No. DE-AC27-10RV15051 Modification No. 118 SF-30 Continuation Page 2 of 3 14. Description of Amendment/Modification Continued: 1. Section B.1, Type of Contract - Items Being Acquired, is revised to increase the obligated funds for Contract Line Item (CLIN) 7 by $3,000,000.00, from $0.00 to $3,000,000.00. The total amount of funds obligated to the contract is increased from $64,465,917.21 to $67,465,917.21. The change is as follows: FROM: TOTAL FUNDS OBLIGATED CLIN Number Description Estimated

  15. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OTHER ___________ (x) x DE-AC05-06OR23100 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already

  16. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC05-06OR23100 Modification No. 507 11 PART I - THE SCHEDULE SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS B.1 ITEMS BEING ACQUIRED (ALTERNATE I) (OCT 2004) The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services (except as may be expressly set forth in this contract as furnished by the Government) and otherwise do all things necessary for, or incident to, the performance and provision of the following items of work: Item 1 - See Section C, Clause

  17. Contract No. DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    Contract No. DE-AC04-94AL85000 Modification No. 473 Page 2 of 36 1. Section B, Clause B-2, Contract Type and Value is amended as follows: (i) Paragraph (b) is revised to add the total estimated cost entry under "Contract Periods" and "Estimated Cost" for FY 2013, changing the "TOTAL through" entry, and adding a place holder for the two option periods as follows: Add: October 1, 2012 through September 30, 2013 $ 2,462,698,305 Option 1: October 1, 2013 through $ TBD*

  18. Twin-tailed fail-over for fileservers maintaining full performance in the presence of a failure

    DOE Patents [OSTI]

    Coteus, Paul W. (Yorktown Heights, NY); Gara, Alan G. (Mount Kisco, NY); Giampapa, Mark E. (Irvington, NY); Heidelberger, Philip (Cortlandt Manor, NY); Steinmacher-Burow, Burkhard D. (Mount Kisco, NY)

    2008-02-12

    A method for maintaining full performance of a file system in the presence of a failure is provided. The file system having N storage devices, where N is an integer greater than zero and N primary file servers where each file server is operatively connected to a corresponding storage device for accessing files therein. The file system further having a secondary file server operatively connected to at least one of the N storage devices. The method including: switching the connection of one of the N storage devices to the secondary file server upon a failure of one of the N primary file servers; and switching the connections of one or more of the remaining storage devices to a primary file server other than the failed file server as necessary so as to prevent a loss in performance and to provide each storage device with an operating file server.

  19. Fluctuation of an ion beam extracted from an AC filament driven Bernas-type ion source

    SciTech Connect (OSTI)

    Miyamoto, N. Okajima, Y.; Wada, M.

    2014-02-15

    Argon ion beam fluctuation from an AC filament driven Bernas-type ion source is observed. The ion beam was measured by an 8 measurement elements beam profile monitor. The amplitude of the beam current fluctuation stayed in the same level from 100 Hz to 1 kHz of the filament heating frequency. The beam current fluctuation frequency measured by the beam profile monitor was equal to the frequency of the AC filament operation. The fluctuation amplitudes of the beam current by AC operation were less than 7% and were in the same level of the DC operation.

  20. Segmented superconducting tape having reduced AC losses and method of making

    DOE Patents [OSTI]

    Foltyn, Stephen R. (Los Alamos, NM); Jia, Quanxi (Los Alamos, NM); Arendt, Paul N. (Los Alamos, NM); Holesinger, Terry G. (Los Alamos, NM); Wang, Haiyan (Los Alamos, NM)

    2009-09-22

    A superconducting tape having reduced AC losses. The tape has a high temperature superconductor layer that is segmented. Disruptive strips, formed in one of the tape substrate, a buffer layer, and the superconducting layer create parallel discontinuities in the superconducting layer that separate the current-carrying elements of the superconducting layer into strips or filament-like structures. Segmentation of the current-carrying elements has the effect of reducing AC current losses. Methods of making such a superconducting tape and reducing AC losses in such tapes are also disclosed.

  1. Greener Commercial A/C Units Becoming a Cool Item | Department of Energy

    Office of Environmental Management (EM)

    Greener Commercial A/C Units Becoming a Cool Item Greener Commercial A/C Units Becoming a Cool Item July 1, 2010 - 5:11pm Addthis Greener Commercial A/C Units Becoming a Cool Item Stephen Graff Former Writer & editor for Energy Empowers, EERE A new federal tax credit is helping McQuay International expand its line of energy-efficient HVAC products at two of its plants and bring back furloughed workers. With the help of a 48C manufacturing tax credit worth $2 million under the American

  2. Role of Salvage Radiation Therapy for Patients With Relapsed or Refractory Hodgkin Lymphoma Who Failed Autologous Stem Cell Transplant

    SciTech Connect (OSTI)

    Goda, Jayant S.; Massey, Christine; Kuruvilla, John; Gospodarowicz, Mary K.; Wells, Woodrow; Hodgson, David C.; Sun, Alexander; Keating, Armand; Crump, Michael; Tsang, Richard W.

    2012-11-01

    Purpose: To analyze, through chart review, the efficacy of salvage radiation therapy (sRT) for relapsed or progressive Hodgkin lymphoma (HL) patients who failed autologous stem cell transplant (ASCT). Patients and Methods: Among 347 patients with recurrent/refractory HL who received ASCT from 1986-2006, 163 had post-ASCT progression or relapse. Of these, 56 received sRT and form the basis of this report. Median age at sRT was 30 years (range, 17-59 years). Disease was confined to lymph nodes in 27 patients, whereas 24 had both nodal and extranodal disease. Salvage radiation therapy alone was given in 34 patients (61%), and sRT plus chemotherapy was given in 22 (39%). Median interval from ASCT to sRT was 0.8 years (range, 0.1-5.6 years). The median dose was 35 Gy (range, 8-40.3 Gy). The sRT technique was extended-field in 14 patients (25%) and involved-field in 42 (75%). Results: The median follow-up from sRT was 31.3 months (range, 0.2-205.5 months). Overall response rate was 84% (complete response: 36%; partial response: 48%). The median overall survival was 40.8 months (95% confidence interval, 34.2-56.3 months). The 5-year overall survival was 29% (95% confidence interval, 14%-44%). The 2-year progression-free survival (PFS) was 16%; the 2-year local PFS was 65%, whereas the 2-year systemic PFS was 17%. The 1-year PFS was higher in patients in whom all diseased sites were irradiated (49%) compared with those in whom only the symptomatic site was treated (22%, P=.07). Among 20 alive patients, 5 were disease free (at 6.4, 6.8, 7.4, 7.9, and 17.1 years). Conclusion: For patients with HL who fail ASCT, a selective use of RT provides a durable local control rate of 65% at 2 years and should be considered as part of the standard management plan for the palliation of incurable HL. Occasionally irradiation of truly localized disease can lead to long-term survival.

  3. Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex partecommunication...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ex parte communication Meeting of May 16, 2013 Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex parte communication Meeting of May 16, 2013 This memorandum for the record ...

  4. DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of Comments by Howe Corporation Comments to the following DOE Proposed Rules: 10 CFR Part 431 Docket No. ...

  5. Tank Operations Contract Section J Contract No. DE-AC27-08RV14800...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J Contract No. DE-AC27-08RV14800 Modification No. 280 J.4-1 SECTION J, ATTACHMENT J.4 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) Tank Operations Contract Section J Contract...

  6. Plateau Remediation Contract Section J Contract No. DE-AC06...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    No. 439 J 4-1 August 31, 2015 ATTACHMENT J.4 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Modification...

  7. Microsoft Word - DE-AC06-09RL15009 Section J.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    III Contract No. DE-AC06-09RL15009 Section J Page J-1 Section J Part III - List of Attachments Table of Contents Section Title Page No. J.1 Covered Site ContractorsSub-Contractors...

  8. Contract DE-AC04-94AL85000 Modification M508

    National Nuclear Security Administration (NNSA)

    Contract DE-AC04-94AL85000 Modification M508 Attachment 1 SECTION J APPENDIX C Special Bank Account Agreement (Updated Mod M271, M461, M497, M508) Intentionally left blank for...

  9. AEP (Central and SWEPCO)- Coolsaver A/C Tune Up or Replacement

    Broader source: Energy.gov [DOE]

    Participating customers are eligible to receive a $75 coupon for use toward A/C and heat pump efficiency services performed as a result of the program’s tune-up analysis, contractors are eligible...

  10. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Preliminary Evaluation Results

    SciTech Connect (OSTI)

    Chandler, K.; Eudy, L.

    2007-03-01

    This report provides an evaluation of three prototype fuel cell-powered transit buses operating at AC Transit in Oakland, California, and six baseline diesel buses similar in design to the fuel cell buses.

  11. Solar Electric Grid Integration- Advanced Concepts (SEGIS-AC) Funding Opportunity

    Broader source: Energy.gov [DOE]

    Through the Solar Electric Grid Integration – Advanced Concepts (SEGIS-AC) program, DOE is funding solar projects that are targeting ways to develop power electronics and build smarter, more...

  12. Contract DE-AC02-07CH11358 Modifications Language Changes

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AC02-07CH11358 Modifications Language Changes Modification 183 October 23, 2015 Part I, Section H - Special Contract Requirements (replace Mod 171) Part II, Section I - Contract...

  13. System and Battery Charge Control for PV-Powered AC Lighting Systems

    SciTech Connect (OSTI)

    Kern, G.

    1999-04-01

    This report reviews a number of issues specific to stand-alone AC lighting systems. A review of AC lighting technology is presented, which discusses the advantages and disadvantages of various lamps. The best lamps for small lighting systems are compact fluorescent. The best lamps for intermediate-size systems are high- or low-pressure sodium. Specifications for battery charging and load control are provided with the goal of achieving lamp lifetimes on the order of 16,000 to 24,000 hours and battery lifetimes of 4 to 5 years. A rough estimate of the potential domestic and global markets for stand-alone AC lighting systems is presented. DC current injection tests were performed on high-pressure sodium lamps and the test results are presented. Finally, a prototype system was designed and a prototype system controller (with battery charger and DC/AC inverter) was developed and built.

  14. Contract DE-AC04-94AL85000 Modification M508

    National Nuclear Security Administration (NNSA)

    Contract DE-AC04-94AL85000 Modification M508 Attachment 1 SECTION J APPENDIX C Special Bank Account Agreement (Updated Mod M271, M461, M497, M508) Intentionally left blank for Internet posting purposes.

  15. AVTA Voltec AC Level 1 and Level 2 Charging Systems Testing Results |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy AVTA Voltec AC Level 1 and Level 2 Charging Systems Testing Results AVTA Voltec AC Level 1 and Level 2 Charging Systems Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The

  16. AVTA: Blink AC Level 2 Charging System Testing Results | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Blink AC Level 2 Charging System Testing Results AVTA: Blink AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing

  17. AVTA: ChargePoint AC Level 2 Charging System Testing Results | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy ChargePoint AC Level 2 Charging System Testing Results AVTA: ChargePoint AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results

  18. AVTA: Clipper Creek AC Level 2 Charging System Testing Results | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Clipper Creek AC Level 2 Charging System Testing Results AVTA: Clipper Creek AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes

  19. AVTA: GE Energy WattStation AC Level 2 Charging System Testing Results |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Energy WattStation AC Level 2 Charging System Testing Results AVTA: GE Energy WattStation AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The

  20. AVTA: GE Smart Grid Capable AC Level 2 Testing Results | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy GE Smart Grid Capable AC Level 2 Testing Results AVTA: GE Smart Grid Capable AC Level 2 Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing

  1. AVTA: SPX AC Level 2 Charging System Testing Results | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SPX AC Level 2 Charging System Testing Results AVTA: SPX AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from testing done on the SPX

  2. AVTA: Schneider AC Level 2 Charging System Testing Results | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Schneider AC Level 2 Charging System Testing Results AVTA: Schneider AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following report describes results from

  3. AVTA: Siemens-VersiCharge AC Level 2 Charging System Testing Results |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Siemens-VersiCharge AC Level 2 Charging System Testing Results AVTA: Siemens-VersiCharge AC Level 2 Charging System Testing Results The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results provide benchmark data that researchers can use to develop technology models and guide future research and development. The following

  4. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Preliminary Evaluation Results | Department of Energy Preliminary Evaluation Results Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Preliminary Evaluation Results This report provides an evaluation of three prototype fuel cell-powered transit buses operating at AC Transit in Oakland, California, and six baseline diesel buses similar in design to the fuel cell buses. PDF icon 41041.pdf More Documents & Publications Connecticut Transit (CTTRANSIT) Fuel Cell

  5. FY 2013 Performance Evaluation Report Sandia Corporation, Contract DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    3 Performance Evaluation Report Sandia Corporation, Contract DE-AC04-94AL85000 National Nuclear Security Administration FY 2013 Performance Evaluation Report FOR Sandia Corporation Sandia Field Office Sandia National Laboratories Performance Period: October 2012 - September 2013 DATE: December 23, 2013 Sandia Field Office December 23, 2013 FY 2013 Performance Evaluation Report Page 1 of 23 Sandia Corporation, Contract DE-AC04-94AL85000 Executive Summary This Performance Evaluation Report (PER)

  6. Supernova relic neutrinos and the supernova rate problem: Analysis of uncertainties and detectability of ONeMg and failed supernovae

    SciTech Connect (OSTI)

    Mathews, Grant J. [Center for Astrophysics, Department of Physics, University of Notre Dame, Notre Dame, IN 46556 (United States); Hidaka, Jun; Kajino, Toshitaka; Suzuki, Jyutaro [National Astronomical Observatory of Japan, 2-21-1 Osawa, Mitaka, Tokyo 181-8588 (Japan)

    2014-08-01

    Direct measurements of the core collapse supernova rate (R{sub SN}) in the redshift range 0 ? z ? 1 appear to be about a factor of two smaller than the rate inferred from the measured cosmic massive star formation rate (SFR). This discrepancy would imply that about one-half of the massive stars that have been born in the local observed comoving volume did not explode as luminous supernovae. In this work, we explore the possibility that one could clarify the source of this 'supernova rate problem' by detecting the energy spectrum of supernova relic neutrinos with a next generation 10{sup 6} ton water ?erenkov detector like Hyper-Kamiokande. First, we re-examine the supernova rate problem. We make a conservative alternative compilation of the measured SFR data over the redshift range 0 ?z ? 7. We show that by only including published SFR data for which the dust obscuration has been directly determined, the ratio of the observed massive SFR to the observed supernova rate R{sub SN} has large uncertainties ?1.8{sub ?0.6}{sup +1.6} and is statistically consistent with no supernova rate problem. If we further consider that a significant fraction of massive stars will end their lives as faint ONeMg SNe or as failed SNe leading to a black hole remnant, then the ratio reduces to ?1.1{sub ?0.4}{sup +1.0} and the rate problem is essentially solved. We next examine the prospects for detecting this solution to the supernova rate problem. We first study the sources of uncertainty involved in the theoretical estimates of the neutrino detection rate and analyze whether the spectrum of relic neutrinos can be used to independently identify the existence of a supernova rate problem and its source. We consider an ensemble of published and unpublished core collapse supernova simulation models to estimate the uncertainties in the anticipated neutrino luminosities and temperatures. We illustrate how the spectrum of detector events might be used to establish the average neutrino temperature and constrain SN models. We also consider supernova ?-process nucleosynthesis to deduce constraints on the temperature of the various neutrino flavors. We study the effects of neutrino oscillations on the detected neutrino energy spectrum and also show that one might distinguish the equation of state (EoS) as well as the cause of the possible missing luminous supernovae from the detection of supernova relic neutrinos. We also analyze a possible enhanced contribution from failed supernovae leading to a black hole remnant as a solution to the supernova rate problem. We conclude that indeed it might be possible (though difficult) to measure the neutrino temperature, neutrino oscillations, and the EoS and confirm this source of missing luminous supernovae by the detection of the spectrum of relic neutrinos.

  7. Magnetostrictive materials and method for improving AC characteristics in same

    DOE Patents [OSTI]

    Pulvirenti, Patricia P. (Chicago, IL); Jiles, David C. (Ames, IA)

    2001-08-14

    The present invention provides Terfenol-D alloys ("doped" Terfenol) having optimized performances under the condition of time-dependent magnetic fields. In one embodiment, performance is optimized by lowering the conductivity of Terfenol, thereby improving the frequency response. This can be achieved through addition of Group III or IV elements, such as Si and Al. Addition of these types of elements provides scattering sites for conduction electrons, thereby increasing resistivity by 125% which leads to an average increase in penetration depth of 80% at 1 kHz and an increase in energy conversion efficiency of 55%. The permeability of doped Terfenol remains constant over a wider frequency range as compared with undoped Terfenol. These results demonstrate that adding impurities, such as Si and Al, are effective in improving the ac characteristics of Terfenol. A magnetoelastic Gruneisen parameter, .gamma..sub.me, has also been derived from the thermodynamic equations of state, and provides another means by which to characterize the coupling efficiency in magnetostrictive materials on a more fundamental basis.

  8. System and method for monitoring and controlling stator winding temperature in a de-energized AC motor

    DOE Patents [OSTI]

    Lu, Bin (Kenosha, WI); Luebke, Charles John (Sussex, WI); Habetler, Thomas G. (Snellville, GA); Zhang, Pinjia (Atlanta, GA); Becker, Scott K. (Oak Creek, WI)

    2011-12-27

    A system and method for measuring and controlling stator winding temperature in an AC motor while idling is disclosed. The system includes a circuit having an input connectable to an AC source and an output connectable to an input terminal of a multi-phase AC motor. The circuit further includes a plurality of switching devices to control current flow and terminal voltages in the multi-phase AC motor and a controller connected to the circuit. The controller is configured to activate the plurality of switching devices to create a DC signal in an output of the motor control device corresponding to an input to the multi-phase AC motor, determine or estimate a stator winding resistance of the multi-phase AC motor based on the DC signal, and estimate a stator temperature from the stator winding resistance. Temperature can then be controlled and regulated by DC injection into the stator windings.

  9. Contract No. DE-AC02-09CH11466 Section J - Appendix F J-F-1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    52 Contract No. DE-AC02-09CH11466 Section J - Appendix F J-F-1 Attachment J.6 APPENDIX F Contractor Resources, Commitments, and Agreements Contract No. DE-AC02-09CH11466 Modification No. 0152 Contract No. DE-AC02-09CH11466 Section J - Appendix F J-F-2 This page intentionally blank Modification No. 0152 Contract No. DE-AC02-09CH11466 Section J - Appendix F J-F-3 RESOURCES, SERVICES, AND SUPPORT PROVIDED TO PPPL Princeton University has committed substantial resources and services over the first

  10. Methods, systems and apparatus for controlling operation of two alternating current (AC) machines

    DOE Patents [OSTI]

    Gallegos-Lopez, Gabriel (Torrance, CA); Nagashima, James M. (Cerritos, CA); Perisic, Milun (Torrance, CA); Hiti, Silva (Redondo Beach, CA)

    2012-02-14

    A system is provided for controlling two AC machines. The system comprises a DC input voltage source that provides a DC input voltage, a voltage boost command control module (VBCCM), a five-phase PWM inverter module coupled to the two AC machines, and a boost converter coupled to the inverter module and the DC input voltage source. The boost converter is designed to supply a new DC input voltage to the inverter module having a value that is greater than or equal to a value of the DC input voltage. The VBCCM generates a boost command signal (BCS) based on modulation indexes from the two AC machines. The BCS controls the boost converter such that the boost converter generates the new DC input voltage in response to the BCS. When the two AC machines require additional voltage that exceeds the DC input voltage required to meet a combined target mechanical power required by the two AC machines, the BCS controls the boost converter to drive the new DC input voltage generated by the boost converter to a value greater than the DC input voltage.

  11. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Switchgear Replacement for Fault Duty FY12 This project is a key element of the AC Substation strategy and replaces high priority, high risk of failure and costly to maintain...

  12. Methods, systems and apparatus for controlling operation of two alternating current (AC) machines

    DOE Patents [OSTI]

    Gallegos-Lopez, Gabriel (Torrance, CA); Nagashima, James M. (Cerritos, CA); Perisic, Milun (Torrance, CA); Hiti, Silva (Redondo Beach, CA)

    2012-06-05

    A system is provided for controlling two alternating current (AC) machines via a five-phase PWM inverter module. The system comprises a first control loop, a second control loop, and a current command adjustment module. The current command adjustment module operates in conjunction with the first control loop and the second control loop to continuously adjust current command signals that control the first AC machine and the second AC machine such that they share the input voltage available to them without compromising the target mechanical output power of either machine. This way, even when the phase voltage available to either one of the machines decreases, that machine outputs its target mechanical output power.

  13. System for transmitting low frequency analog signals over AC power lines

    DOE Patents [OSTI]

    Baker, Steven P. (Powell, TN); Durall, Robert L. (Lenoir City, TN); Haynes, Howard D. (Knoxville, TN)

    1989-01-01

    A system for transmitting low frequency analog signals over AC power lines using FM modulation. A low frequency analog signal to be transmitted is first applied to a voltage-to-frequency converter where it is converted to a signal whose frequency varies in proportion to the analog signal amplitude. This signal is then used to modulate the carrier frequency of an FM transmitter coupled to an AC power line. The modulation signal frequency range in selected to be within the response band of the FM transmitter. The FM modulated carrier signal is received by an FM receiver coupled to the AC power line, demodulated and the demodulated signal frequency is converted by a frequency-to-voltage converter back to the form of the original low frequency analog input signal.

  14. A system for tranmitting low frequency analog signals over ac power lines

    DOE Patents [OSTI]

    Baker, S.P.; Durall, R.L.; Haynes, H.D.

    1987-07-30

    A system for transmitting low frequency analog signals over ac power lines using FM modulation. A low frequency analog signal to be transmitted is first applied to a voltage-to-frequency converter where it is converted to a signal whose frequency varies in proportion to the analog signal amplitude. This signal is then used to modulate the carrier frequency of an FM transmitter coupled to an ac power line. The modulation signal frequency range is selected to be within the response band of the FM transmitter. The FM modulated carrier signal is received by an FM receiver coupled to the ac power line, demodulated and the demodulated signal frequency is converted by a frequency-to-voltage converter back to the form of the original low frequency analog input signal. 4 figs.

  15. Method And Apparatus For Production Of Bi-213 From The Activity Ac-225 Source

    DOE Patents [OSTI]

    Egorov, Oleg B. (West Richland, WA); O'Hara, Matthew J. (Richland, WA)

    2005-12-06

    A method and apparatus for isolating and purifying a .sup.213 Bi radioactive isotope from an .sup.225 Ac source using a primary column and a primary sorbent which preferentially retains .sup.225 Ac over .sup.213 Bi when exposed to a compatible solvent in combination with a secondary column having a secondary sorbent which retains .sup.213 Bi when exposed to a mixture of the compatible solvent and .sup.213 Bi. A "compatible solvent" is a solvent which will preferentially remove .sup.213 Bi radioactive isotopes from a primary sorbent without removing .sup.225 Ac radioactive isotopes, and then allow .sup.213 Bi radioactive isotopes removed from the primary sorbent to be retained on a secondary sorbent, without having to dilute or otherwise chemically or physically modify the compatible solvent in between exposure to the primary and secondary sorbents.

  16. Linear optics measurements and corrections using an AC dipole in RHIC

    SciTech Connect (OSTI)

    Wang, G.; Bai, M.; Yang, L.

    2010-05-23

    We report recent experimental results on linear optics measurements and corrections using ac dipole. In RHIC 2009 run, the concept of the SVD correction algorithm is tested at injection energy for both identifying the artificial gradient errors and correcting it using the trim quadrupoles. The measured phase beatings were reduced by 30% and 40% respectively for two dedicated experiments. In RHIC 2010 run, ac dipole is used to measure {beta}* and chromatic {beta} function. For the 0.65m {beta}* lattice, we observed a factor of 3 discrepancy between model and measured chromatic {beta} function in the yellow ring.

  17. Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 | Department of

    Energy Savers [EERE]

    Energy Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 This memorandum for the record provides a summary of a visit by Mr. Roland Risser, Program Manager, Building Technologies Program, U.S. Department of Energy, to the February 22, 2013, meeting of the Steering Committee for the Set-Top Box Voluntary Agreement in Washington, D.C. PDF icon CEA memo to DOE re ex parte communication_2-28-13.pdf More Documents & Publications Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex parte

  18. Contract No.: DE-AC02-07CH11358 Contract Modification No. 0159

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    : DE-AC02-07CH11358 Contract Modification No. 0159 Section J, Appendix C ATTACHMENT J.3 APPENDIX C SPECIAL FINANCIAL INSTITUTION ACCOUNT AGREEMENT Applicable to the Operation of AMES Laboratory Contract No. DE-AC02-07CH11358 AMENDMENT 8 TO SPECIAL FINANCIAL INSTITUTION ACCOUNT Page 1 of 2 AGREEMENT FOR USE WITH THE PAYMENTS CLEARED FINANCING ARRANGEMENT between BANKERS TRUST COMPANY, N.A. (hereinafter referred to as the "Financial Institution"), and IOWA STATE UNIVERSITY of Science and

  19. Microsoft Word - DE-AC06-09RL15009 Section C.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Part I Contract No. DE-AC06-09RL15009 Section C Page C-1 Section C Statement of Work Table of Contents Section Page C.1 Introduction C-2 C.2 Performance Requirements, CLIN0001-CLIN0007 C-3 C.3 Additional Performance Requirements for Claims Management C-3 C.4 Management and Oversight of Insurance Claim Number 8600434 C-7 C.5 Energy Employees Occupational Illness Compensation Program Act (EEOICPA) CLIN0008 C-7 Workers' Compensation Claims Services Part I Contract No. DE-AC06-09RL15009 Section C

  20. Mission Support Contract Section J-16 Contract No. DE-AC-09RL14728 Modification 080

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section J-16 Contract No. DE-AC-09RL14728 Modification 080 Page 1 of 2 Task Order 11-002 Independent Assessment of the 618-10 Burial Ground Characterization The contractor shall provide the following services, as requested and as described below. The Contractor shall perform these services in accordance with Contract DE-AC06-09RL14728, C.2.5, Portfolio Management, meet milestones and delivery schedules as established by the Federal Project Director, River Corridor Closure Project and/or his

  1. Surplus Facilities Management Program (SFMP) Contract No. DE-AC05-810R20722

    Office of Legacy Management (LM)

    '^ l '"17 ^' ~/t~ >7~ 6~'1 ~DOE/OR/20722-18 Surplus Facilities Management Program (SFMP) Contract No. DE-AC05-810R20722 NIAGARA FALLS STORAGE SITE ENVIRONMENTAL MONITORING REPORT Calendar Year 1983 July 1984 Bechtel National, Inc. Advanced Technology Division DOE/OR/20722-18 NIAGARA FALLS STORAGE SITE ENVIRONMENTAL MONITORING REPORT CALENDAR YEAR 1983 July 1984 Prepared for U.S. DEPARTMENT OF ENERGY OAK RIDGE OPERATIONS OFFICE Under Contract No. DE-AC05-810R20722 By Bechtel National,

  2. Turning on the Fan and Turning off the A/C | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Turning on the Fan and Turning off the A/C Turning on the Fan and Turning off the A/C September 20, 2010 - 3:00pm Addthis As part of some recent money- and energy-savings improvements I've been making to my home, a couple of weeks ago I installed a ceiling fan in my main living room. Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory As part of some recent money- and energy-savings improvements I've been making to my home, a couple of weeks ago I installed a ceiling

  3. The War of the Currents: AC vs. DC Power | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The War of the Currents: AC vs. DC Power The War of the Currents: AC vs. DC Power November 18, 2014 - 11:55am Addthis Electrical transmission lines cross a snow-covered field in Dallas Dam, Oregon. | Photo courtesy of the Energy Department Electrical transmission lines cross a snow-covered field in Dallas Dam, Oregon. | Photo courtesy of the Energy Department Allison Lantero Allison Lantero Digital Content Specialist, Office of Public Affairs How can I participate? Check out our Infographic on

  4. Mission Support Contract Attachment J.10 Contract No. DE-AC06-09RL14728 Modification 464

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Attachment J.10 Contract No. DE-AC06-09RL14728 Modification 464 Table Of Contents J.10-1 SERVICE CONTRACT ACT: WAGE DETERMINATION ...................................................................... 2 J.10-2 DAVIS BACON ACT: GENERAL DECISION ..................................................................................... 23 J.10-3 COLLECTIVE BARGAINING ACT: WAGE DETERMINATION .................................. 30 Mission Support Contract Attachment J.10 Contract No. DE-AC06-09RL14728

  5. 222-S LAS&T Contract No. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC27-10RV15051 Conformed thru Contract Modification No. 127 J-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J LIST OF ATTACHMENTS Table of Contents ATTACHMENT 1: DOE DIRECTIVES APPLICABLE TO THE 222-S LAB ............................................... 2 ATTACHMENT 2: 222-S LABORATORY DOCUMENTED SAFETY ANALYSIS ..................................... 5 DSA HNF-12125.pdf

  6. Non-Federal Participation in AC Intertie : Final Environmental Impact Statement. Volume 1: Environmental Analysis.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-01-01

    Bonneville Power Administration (BPA) is considering action in two areas: (1) non-Federal access to the AC Intertie, and, (2) BPA Intertie marketing. BPA`s preferred alternative for non-Federal access is the Capacity Ownership alternative combined with the Increased Assured Delivery -- Access for Non-Scheduling Utilities alternative; the preferred alternative for BPA Intertie marketing is the Federal Marketing and Joint Ventures alternative. BPA considered these two areas previously in its Intertie Development and Use EIS of April 1988. The EIS resulted in BPA decisions to participate in the construction of the Third AC Intertie, to allow non-Federal access to BPA`s share of the Pacific Northwest-Pacific Southwest (PNW-PSW) Intertie (AC and DC lines) pursuant to a Long-Term Intertie Access Policy (LTIAP), and to pursue BPA`s export marketing alternative. The decision on allowing direct financial non-Federal participation in the Third AC line was deferred to a later, separate process, examined here. Also, BPA`s export marketing objectives must now be examined in view of changed operations of Columbia River hydro facilities for improved fish survival.

  7. IEEE aims to improve seismic design of power substations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    engineer to defined needs and conditions. And there's a huge benefit to the public. "The seismic qualification process is far more efficient and costs are distributed...

  8. Microsoft Word - Tacoma-Raver-Substation-Antenna-CX.doc

    Office of Environmental Management (EM)

    EH ZRUNLQJ ZLWKLQ WKH HLVWLQJ&15; JUDYHOHG VXEVWDWLRQ DUGV DQG FRQWURO KRXVHV&30; WKHUH LV QR YHJHWDWLRQ LQ WKH DUGV DQG QR KDELWDW RU VSHFLDO DUHDV RI LQWHUHVW WKDW ZRXOG EH...

  9. Observation of multi-scale oscillation of laminar lifted flames with low-frequency AC electric fields

    SciTech Connect (OSTI)

    Ryu, S.K.; Kim, Y.K.; Kim, M.K.; Won, S.H. [School of Mechanical and Aerospace Engineering, Seoul National University, Seoul 151-742 (Korea); Chung, S.H. [Clean Combustion Research Center, King Abdullah University of Science and Technology, Thuwal (Saudi Arabia)

    2010-01-15

    The oscillation behavior of laminar lifted flames under the influence of low-frequency AC has been investigated experimentally in coflow jets. Various oscillation modes were existed depending on jet velocity and the voltage and frequency of AC, especially when the AC frequency was typically smaller than 30 Hz. Three different oscillation modes were observed: (1) large-scale oscillation with the oscillation frequency of about 0.1 Hz, which was independent of the applied AC frequency, (2) small-scale oscillation synchronized to the applied AC frequency, and (3) doubly-periodic oscillation with small-scale oscillation embedded in large-scale oscillation. As the AC frequency decreased from 30 Hz, the oscillation modes were in the order of the large-scale oscillation, doubly-periodic oscillation, and small-scale oscillation. The onset of the oscillation for the AC frequency smaller than 30 Hz was in close agreement with the delay time scale for the ionic wind effect to occur, that is, the collision response time. Frequency-doubling behavior for the small-scale oscillation has also been observed. Possible mechanisms for the large-scale oscillation and the frequency-doubling behavior have been discussed, although the detailed understanding of the underlying mechanisms will be a future study. (author)

  10. Review of the design and performance features of hvdc systems connected to low short circuit ratio ac systems

    SciTech Connect (OSTI)

    Thallam, R.S. )

    1992-10-01

    The design and performance of an HVdc system is significantly impacted by the relative strength of the ac system to which it is connected. In this paper, design and performance features of ten HVdc systems are discussed. All of these systems are connected to ac systems that are relatively weak compared to the rating of the dc system. Six of these systems are back-to-back, two are overhead lines, and two are undersea cable connections. AC and dc system interaction problems and how they are addressed in the design and specification of each of these systems, are described.

  11. DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of

    Energy Savers [EERE]

    Comments by Howe Corporation | Department of Energy 0 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of Comments by Howe Corporation DOE 10 CFR Part 431 EERE-2010-BT-TP-0036 RIN 1904-AC-38 Submission of Comments by Howe Corporation Comments to the following DOE Proposed Rules: 10 CFR Part 431 [Docket No. EERE-2010-BT-TP-0036] RIN 1904-AC38 Energy Efficiency Program for Certain Commercial and Industrial Equipment: Test Procedures for Automatic Commercial Ice Makers PDF icon

  12. Effect of the valence electron concentration on the bulk modulus and chemical bonding in Ta{sub 2}AC and Zr{sub 2}AC (A=Al, Si, and P)

    SciTech Connect (OSTI)

    Schneider, Jochen M.; Music, Denis; Sun Zhimei

    2005-03-15

    We have studied the effect of the valence electron concentration, on the bulk modulus and the chemical bonding in Ta{sub 2}AC and Zr{sub 2}AC (A=Al, Si, and P) by means of ab initio calculations. Our equilibrium volume and the hexagonal ratio (c/a) agree well (within 2.7% and 1.2%, respectively) with previously published experimental data for Ta{sub 2}AlC. The bulk moduli of both Ta{sub 2}AC and Zr{sub 2}AC increase as Al is substituted with Si and P by 13.1% and 20.1%, respectively. This can be understood since the substitution is associated with an increased valence electron concentration, resulting in band filling and an extensive increase in cohesion.

  13. An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.

    SciTech Connect (OSTI)

    Litzenberger, Wayne; Lava, Val

    1994-08-01

    References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

  14. AuRu/AC as an effective catalyst for hydrogenation reactions

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Villa, Alberto; Chan-Thaw, Carine E.; Campisi, Sebastiano; Bianchi, Claudia L.; Wang, Di; Kotula, Paul G.; Kübel, Christian; Prati, Laura

    2015-03-23

    AuRu bimetallic catalysts have been prepared by sequential deposition of Au on Ru or vice versa obtaining different nanostructures: when Ru has been deposited on Au, a Aucore–Rushell has been observed, whereas the deposition of Au on Ru leads to a bimetallic phase with Ru enrichment on the surface. In the latter case, the unexpected Ru enrichment could be attributed to the weak adhesion of Ru on the carbon support, thus allowing Ru particles to diffuse on Au particles. Both structures result very active in catalysing the liquid phase hydrogenolysis of glycerol and levulinic acid but the activity, the selectivitymore » and the stability depend on the structure of the bimetallic nanoparticles. Ru@Au/AC core–shell structure mostly behaved as the monometallic Ru, whereas the presence of bimetallic AuRu phase in Au@Ru/AC provides a great beneficial effect on both activity and stability.« less

  15. Kondo physics in the single-electron transistor with ac driving

    SciTech Connect (OSTI)

    Nordlander, Peter; Wingreen, Ned S.; Meir, Yigal; Langreth, David C.

    2000-01-15

    Using a time-dependent Anderson Hamiltonian, a quantum dot with an ac voltage applied to a nearby gate is investigated. A rich dependence of the linear response conductance on the external frequency and driving amplitude is demonstrated. At low frequencies a sufficiently strong ac potential produces sidebands of the Kondo peak in the spectral density of the dot, and a slow, roughly logarithmic decrease in conductance over several decades of frequency. At intermediate frequencies, the conductance of the dot displays an oscillatory behavior due to the appearance of Kondo resonances of the satellites of the dot level. At high frequencies, the conductance of the dot can vary rapidly due to the interplay between photon-assisted tunneling and the Kondo resonance. (c) 2000 The American Physical Society.

  16. AuRu/AC as an effective catalyst for hydrogenation reactions

    SciTech Connect (OSTI)

    Villa, Alberto; Chan-Thaw, Carine E.; Campisi, Sebastiano; Bianchi, Claudia L.; Wang, Di; Kotula, Paul G.; Kbel, Christian; Prati, Laura

    2015-03-23

    AuRu bimetallic catalysts have been prepared by sequential deposition of Au on Ru or vice versa obtaining different nanostructures: when Ru has been deposited on Au, a AucoreRushell has been observed, whereas the deposition of Au on Ru leads to a bimetallic phase with Ru enrichment on the surface. In the latter case, the unexpected Ru enrichment could be attributed to the weak adhesion of Ru on the carbon support, thus allowing Ru particles to diffuse on Au particles. Both structures result very active in catalysing the liquid phase hydrogenolysis of glycerol and levulinic acid but the activity, the selectivity and the stability depend on the structure of the bimetallic nanoparticles. Ru@Au/AC coreshell structure mostly behaved as the monometallic Ru, whereas the presence of bimetallic AuRu phase in Au@Ru/AC provides a great beneficial effect on both activity and stability.

  17. Clock Controller For Ac Self-Timing Analysis Of Logic System

    DOE Patents [OSTI]

    Lo, Tinchee (Fishkill, NY); Flanagan, John D. (Rhinebeck, NY)

    2004-05-18

    A clock controller and clock generating method are provided for AC self-test timing analysis of a logic system. The controller includes latch circuitry which receives a DC input signal at a data input, and a pair of continuous out-of-phase clock signals at capture and launch clock inputs thereof. The latch circuitry outputs two overlapping pulses responsive to the DC input signal going high. The two overlapping pulses are provided to waveform shaper circuitry which produces therefrom two non-overlapping pulses at clock speed of the logic system to be tested. The two non-overlapping pulses are a single pair of clock pulses which facilitate AC self-test timing analysis of the logic system.

  18. Contract Number DE-AC27-08RV14800 Continuation Page, Modification 138

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Number DE-AC27-08RV14800 Continuation Page, Modification 138 Attachment 1 DE-AC27-08RV14800, MODIFICATION 138 Replacement Pages (Total: One Hundred Twenty-Five (125) including this Cover Page) * Section H, Pages H-4 and H-24 * Section J, Table of Contents, Page J-1 * Section J, Attachment J.2, Pages J.2-4 thru J.2-7 and J.2.9 * Section J, Attachment J.10, Pages J.10-1 thru J.10-20 * Section J, Attachment J.13, Pages J.13-1 thru J.13-29 * Section J, Attachment J.14, Pages J.14-1 thru

  19. Switch contact device for interrupting high current, high voltage, AC and DC circuits

    DOE Patents [OSTI]

    Via, Lester C.; Witherspoon, F. Douglas; Ryan, John M.

    2005-01-04

    A high voltage switch contact structure capable of interrupting high voltage, high current AC and DC circuits. The contact structure confines the arc created when contacts open to the thin area between two insulating surfaces in intimate contact. This forces the arc into the shape of a thin sheet which loses heat energy far more rapidly than an arc column having a circular cross-section. These high heat losses require a dramatic increase in the voltage required to maintain the arc, thus extinguishing it when the required voltage exceeds the available voltage. The arc extinguishing process with this invention is not dependent on the occurrence of a current zero crossing and, consequently, is capable of rapidly interrupting both AC and DC circuits. The contact structure achieves its high performance without the use of sulfur hexafluoride.

  20. Construction of AC Motor Controllers for NOvA Experiment Upgrades

    SciTech Connect (OSTI)

    Cooley, Patrick; ,

    2011-08-04

    I have been constructing Alternating Current (AC) motor controllers for manipulation of particle beam detectors. The capability and reliability of these motor controllers are essential to the Laboratory's mission of accurate analysis of the particle beam's position. The device is moved in and out of the beam's path by the motor controller followed by the Neutrinos at the Main Injector Off-Axis {nu}{sub e} Appearance (NOvA) Experiment further down the beam pipe. In total, I built and tested ten ac motor controllers for new beam operations in the NOvA experiment. These units will prove to be durable and provide extremely accurate beam placement for NOvA Experiment far into the future.

  1. The correction of linear lattice gradient errors using an AC dipole

    SciTech Connect (OSTI)

    Wang,G.; Bai, M.; Litvinenko, V.N.; Satogata, T.

    2009-05-04

    Precise measurement of optics from coherent betatron oscillations driven by ac dipoles have been demonstrated at RHIC and the Tevatron. For RHIC, the observed rms beta-beat is about 10%. Reduction of beta-beating is an essential component of performance optimization at high energy colliders. A scheme of optics correction was developed and tested in the RHIC 2008 run, using ac dipole optics for measurement and a few adjustable trim quadruples for correction. In this scheme, we first calculate the phase response matrix from the. measured phase advance, and then apply singular value decomposition (SVD) algorithm to the phase response matrix to find correction quadruple strengths. We present both simulation and some preliminary experimental results of this correction.

  2. National Fuel Cell Bus Program: Accelerated Testing Evaluation Report and Appendices, Alameda-Contra Costa Transit District (AC Transit)

    SciTech Connect (OSTI)

    Chandler, K.; Eudy, L.

    2009-01-01

    This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006 compared to similar diesel buses operating from the same depot. This evaluation report includes results from November 2007 through October 2008. Evaluation results include implementation experience, fueling station operation, fuel cell bus operations at Golden Gate Transit, and evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and roadcalls).

  3. National Fuel Cell Bus Program: Accelerated Testing Evaluation Report #2, Alameda-Contra Costa Transit District (AC Transit) and Appendices

    SciTech Connect (OSTI)

    Eudy, L.; Chandler, K.

    2010-06-01

    This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006, comparing similar diesel buses operating from the same depot. It covers November 2007 through February 2010. Results include implementation experience, fueling station operation, evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and road calls), and a summary of achievements and challenges encountered during the demonstration.

  4. SUBMERGED GRAVEL SCRUBBER DEMONSTRATION AS A PASSIVE AIR CLEANER FOR CONTAINMENT VENTING AND PURGING WITH SODIUM AEROSOLS -- CSTF TESTS AC7 - AC10

    SciTech Connect (OSTI)

    HILLIARD, R K.; MCCORMACK, J D.; POSTMA, A K.

    1981-11-01

    Four large-scale air cleaning tests (AC7 - AC10) were performed in the Containment Systems Test Facility (CS'lF) to demonstrate the performance of a Submerged Gravel Scrubber for cleaning the effluent gas from a vented and purged breeder reactor containment vessel. The test article, comprised of a Submerged Gravel Scrubber (SGS) followed by a high efficiency fiber demister, had a design gas flow rate of 0.47 m{sup 3}/s (1000 ft{sup 3}/min) at a pressure drop of 9.0 kPa (36 in. H{sub 2}O). The test aerosol was sodium oxide, sodium hydroxide, or sodium carbonate generated in the 850-m{sup 3} CSTF vessel by continuously spraying sodium into the air-filled vessel while adding steam or carbon dioxide. Approximately 4500 kg (10,000 lb) of sodium was sprayed over a total period of 100 h during the tests. The SGS/Demister system was shown to be highly efficient (removing ~99.98% of the entering sodium aerosol mass), had a high mass loading capacity, and operated in a passive manner, with no electrical requirement. Models for predicting aerosol capture, gas cooling, and pressure drop are developed and compared with experimental results.

  5. Degradation of silicon ac-coupled microstrip detectors induced by radiation

    SciTech Connect (OSTI)

    Bacchetta, N.; Gotra, Yu.; Bisello, D.; Canali, C.; Fuochi, P.G.; Paccagnella, A.; Verzellesi, G.

    1993-12-01

    Results are presented showing the radiation response of ac-coupled FOXFET biased microstrip detectors and related test patterns to be used in the microvertex detector of the CDF experiment at Fermi National Laboratory. Radiation tolerance of detectors to gamma and proton irradiation has been tested and the radiation induced variations of the dc electrical parameters have been analyzed. Long term post-irradiation behavior of detector characteristics have been studied, and the relevant room temperature annealing phenomena have been discussed.

  6. Oak Ridge Associated Universities DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Universities DE-AC05-06OR23100 Modification 0515 PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J - LIST OF ATTACHMENTS ATTACHMENT F - KEY PERSONNEL (Revised 1/30/2015) NAME TITLE Harry A. (Andy) Page ORISE Director Donna L. Cragle Director, Health, Energy, and Environment David Hackemeyer Director, National Security Dean M. Evasius Director, Scientific Assessment and Workforce Development J. Phil Andrews Director, Business Operations and Chief Financial Officer Ivan A.

  7. Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex parte

    Energy Savers [EERE]

    communication Meeting of May 16, 2013 | Department of Energy Ex parte communication Meeting of May 16, 2013 Docket No. EERE-2012-BT-TP-0046; RIN 1904-AC52 Ex parte communication Meeting of May 16, 2013 This memorandum for the record provides a summary of a meeting involving representatives of the Consumer Electronics Association and National Cable & Telecommunications Association with Dr. David Danielson, Assistant Secretary for Energy Efficiency and Renewable Energy. PDF icon CEA memo

  8. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third Evaluation Report - Appendices | Department of Energy Third Evaluation Report - Appendices Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Third Evaluation Report - Appendices This report describes operations at Alameda-Contra Costa Transit district for three protoype fuel cell buses and six diesel buses operating from the same location. PDF icon 43545-2.pdf More Documents & Publications Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Second

  9. Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third Evaluation Report | Department of Energy Report Alameda-Contra Costa Transit District (AC Transit) Fuel Cell Transit Buses: Third Evaluation Report This report describes operations at Alameda-Contra Costa Transit district for three protoype fuel cell buses and six diesel buses operating from the same location. PDF icon 43545-1.pdf More Documents & Publications SunLine Transit Agency Fuel Cell Transit Bus: Fifth Evaluation Report SunLine Transit Agency Hydrogen-Powered Transit

  10. PPPL engineers design and build state-of-the-art controller for AC to DC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    converter that manages plasma in upgraded fusion machine | Princeton Plasma Physics Lab PPPL engineers design and build state-of-the-art controller for AC to DC converter that manages plasma in upgraded fusion machine By Raphael Rosen March 7, 2016 Tweet Widget Google Plus One Share on Facebook PPPL scientists Robert Mozulay and Weiguo Que (Photo by Hans Schneider) PPPL scientists Robert Mozulay and Weiguo Que Gallery: A digital firing generator installed in NSTX-U (Photo by Hans Schneider)

  11. Contract No. DE-AC06-97RL13184, Modification 158 Attachment J-1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AC06-97RL13184, Modification 158 Attachment J-1 Page 1 of 9 WD 05-2569 (Rev.-14) was first posted on www.wdol.gov on 06/19/2012 ************************************************************************************ REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION By direction of the Secretary of Labor | WAGE AND HOUR DIVISION | WASHINGTON D.C. 20210 | | | | Wage Determination No.: 2005-2569 Diane C. Koplewski Division

  12. Joint BioEnergy Institute Oxime-NIMS Work Featured on the Cover of ACS

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Chemical Biology Oxime-NIMS Work Featured on the Cover of ACS Chemical Biology - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing

  13. by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344.

    Broader source: Energy.gov (indexed) [DOE]

    work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. Richard A. Rankin Director, Industrial Partnerships Office and Interim Director Economic Development Office 22 May 2015 LLNL-PRES-670964 Lawrence Livermore National Laboratory LLNL-PRES-670964 From a mission-focus perspective, there are four areas where the nature of the security mission means interacting with private sector owners, and operators: *

  14. Modification No. M089 Contract No. DE-AC04-00AL66620

    National Nuclear Security Administration (NNSA)

    9 Contract No. DE-AC04-00AL66620 Attachment 1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J - LIST OF ATTACHMENTS APPENDIX D - KEY PERSONNEL May 2, 2005 Pursuant to the clause entitled "Key Personnel," the following positions are considered to be essential to work being performed. General Manager Michael B. Mallory Deputy General Manager Dan J. Swaim Director of Directed Stockpile Programs Dominick Palamara Director of RTBF Programs Michael A. Sabbe

  15. Sandia Corporation Contract No. DE-AC04-94AL85000

    National Nuclear Security Administration (NNSA)

    Corporation Contract No. DE-AC04-94AL85000 Modification No. 585 Attachment 1 Part III - Section J Appendix D Key Personnel September 11, 2015 (Modification No. 585) The Contractor's employees identified below are determined to be necessary for the successful performance of this Contract. The purpose of this listing is to identify those employees whose initial assignment, reassignment, or replacement shall be subject to the approval of the Contracting Officer, pursuant to the Contract Clause

  16. Sandia Corporation, Contract No. DE-AC04-94AL85000 Modification No. M537

    National Nuclear Security Administration (NNSA)

    Corporation, Contract No. DE-AC04-94AL85000 Modification No. M537 Attachment 1 Part III - Section J Appendix G List of Applicable Directives and NNSA Policy Letters In addition to the list of applicable directives referenced below, the contractor shall also comply with supplementary directives (e.g., manuals), which are invoked by a Contractor Requirements Document (CRD) attached to a directive referenced below. This List excludes directives that have been granted an exemption from the CRD in

  17. Rotor dynamic analysis of GCEP (Gas Centrifuge Enrichment Plant) Tails Withdrawal Test Facility AC-12 compressor

    SciTech Connect (OSTI)

    Spencer, J.W.

    1982-01-22

    The reliable operation of the centrifugal compressors utilized in the gaseous diffusion process is of great importance due to the critical function of these machines in product and tails withdrawal, cascade purge and evacuation processes, the purge cascade and product booster applications. The same compressors will be used in equally important applications within the Gas Centrifuge Enrichment Plant (GCEP). In response to concern over the excessive vibration exhibited by the AC-12 compressor in the No. 3 position of the GCEP Tails Withdrawal Test Facility, a rotor-bearing dynamic analysis was performed on the compressor. This analysis included the acquisition and reduction of compressor vibration data, characterization and modeling of the rotorbearing system, a computer dynamic study, and recommendations for machine modification. The compressor dynamic analysis was performed for rotor speeds of 9000 rpm and 7200 to 7800 rpm, which includes all possible opreating speeds of the compressor in the GCEP Test Facility. While the analysis was performed on this particular AC-12 compressor, the results should be pertinent to other AC-12 applications as well. Similar diagnostic and analytical techniques can be used to evaluate operation of other types of centrifugal compressors.

  18. Comparison of the Accuracy and Speed of Transient Mobile A/C System Simulation Models: Preprint

    SciTech Connect (OSTI)

    Kiss, T.; Lustbader, J.

    2014-03-01

    The operation of air conditioning (A/C) systems is a significant contributor to the total amount of fuel used by light- and heavy-duty vehicles. Therefore, continued improvement of the efficiency of these mobile A/C systems is important. Numerical simulation has been used to reduce the system development time and to improve the electronic controls, but numerical models that include highly detailed physics run slower than desired for carrying out vehicle-focused drive cycle-based system optimization. Therefore, faster models are needed even if some accuracy is sacrificed. In this study, a validated model with highly detailed physics, the 'Fully-Detailed' model, and two models with different levels of simplification, the 'Quasi-Transient' and the 'Mapped- Component' models, are compared. The Quasi-Transient model applies some simplifications compared to the Fully-Detailed model to allow faster model execution speeds. The Mapped-Component model is similar to the Quasi-Transient model except instead of detailed flow and heat transfer calculations in the heat exchangers, it uses lookup tables created with the Quasi-Transient model. All three models are set up to represent the same physical A/C system and the same electronic controls. Speed and results of the three model versions are compared for steady state and transient operation. Steady state simulated data are also compared to measured data. The results show that the Quasi-Transient and Mapped-Component models ran much faster than the Fully-Detailed model, on the order of 10- and 100-fold, respectively. They also adequately approach the results of the Fully-Detailed model for steady-state operation, and for drive cycle-based efficiency predictions

  19. DE-AC26-01NT41007 | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Mallik 2002 Consortium: Drilling and Testing a Gas Hydrate Well DE-AC26-01NT41007 Last Reviewed 02/05/2010 photo of the drillsite at the Mallik 5L-39 location Drillsite at Mallik 5L-38 location courtesy Geological Survey of Canada Project Goal Obtain information that can be utilized to develop gas hydrate computer production models. Performer Geological Survey of Canada - manager of consortium Location Ottawa, ON K1A -0E8 Background The Mallik Gas Hydrate Research Well Project began in 1998,

  20. DE-AC27-10RV15051 Modification A001

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC27-10RV15051 Modification A001 Page 2 of 12 The purpose of this change order is to (1) add American Recovery and Reinvestment Act (ARRA) tasks (2) obligate ARRA funding, (3) incorporate applicable ARRA clauses. 1. CHANGE ORDER This change order modification is issued pursuant to contract clause I-75, entitled FAR 52.243-2 - Changes - Cost-Reimbursement (Aug 1987), Alternate I (Apr 1984). Under this authority the contractor is directed to proceed with performance of ARRA tasks as outlined

  1. DE-AC27-I1ORVI15051 Modification A009

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    I1ORVI15051 Modification A009 Page 2 of 6 A. The purpose of this modification is to make an equitable adjustment to contract cost relevant to transition cost and the stop work order dated November 27, 2009, and modify the period of performance as detailed below: Reference: 1. ATL Letter dated May 24, 2010, from J.G. Hwang, ATL, to D.A. Gallegos, ORP, "CLIN 1 TRANSITION COST OVERRUN PROPOSAL (Contract Number DE-AC27-1I0RV 1505 1) Background: The contract was awarded on November 20, 2009, and

  2. DOE Contract Number DE-AC05-060R231

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE Contract Number DE-AC05-060R231 00 Modification M045 Oak Ridge Associated Universities Page 2 of2 14. Description of AmendmenVModification: The purpose of this modification is to accomplish the following: 1) Advise you of changes in 10 CFR 707 which is invoked by DEAR 970.5223-4: 1) the definition of Testing Designated Positions (TOPs) now includes all contractor personnel with security clearances; 2) the percent of personnel to be randomly tested on an annual basis has been decreased from

  3. THE HST/ACS COMA CLUSTER SURVEY. II. DATA DESCRIPTION AND SOURCE CATALOGS

    SciTech Connect (OSTI)

    Hammer, Derek; Verdoes Kleijn, Gijs; Den Brok, Mark; Peletier, Reynier F.; Hoyos, Carlos; Balcells, Marc; Aguerri, Alfonso L.; Ferguson, Henry C.; Goudfrooij, Paul; Carter, David; Guzman, Rafael; Smith, Russell J.; Lucey, John R.; Graham, Alister W.; Trentham, Neil; Peng, Eric; Puzia, Thomas H.; Jogee, Shardha; Batcheldor, Dan; Bridges, Terry J.

    2010-11-15

    The Coma cluster, Abell 1656, was the target of an HST-ACS Treasury program designed for deep imaging in the F475W and F814W passbands. Although our survey was interrupted by the ACS instrument failure in early 2007, the partially completed survey still covers {approx}50% of the core high-density region in Coma. Observations were performed for 25 fields that extend over a wide range of cluster-centric radii ({approx}1.75 Mpc or 1{sup 0}) with a total coverage area of 274 arcmin{sup 2}. The majority of the fields are located near the core region of Coma (19/25 pointings) with six additional fields in the southwest region of the cluster. In this paper, we present reprocessed images and SEXTRACTOR source catalogs for our survey fields, including a detailed description of the methodology used for object detection and photometry, the subtraction of bright galaxies to measure faint underlying objects, and the use of simulations to assess the photometric accuracy and completeness of our catalogs. We also use simulations to perform aperture corrections for the SEXTRACTOR Kron magnitudes based only on the measured source flux and its half-light radius. We have performed photometry for {approx}73,000 unique objects; approximately one-half of our detections are brighter than the 10{sigma} point-source detection limit at F814W = 25.8 mag (AB). The slight majority of objects (60%) are unresolved or only marginally resolved by ACS. We estimate that Coma members are 5%-10% of all source detections, which consist of a large population of unresolved compact sources (primarily globular clusters but also ultra-compact dwarf galaxies) and a wide variety of extended galaxies from a cD galaxy to dwarf low surface brightness galaxies. The red sequence of Coma member galaxies has a color-magnitude relation with a constant slope and dispersion over 9 mag (-21 < M {sub F814W} < -13). The initial data release for the HST-ACS Coma Treasury program was made available to the public in 2008 August. The images and catalogs described in this study relate to our second data release.

  4. Contract No. DE-AC02-07CH11358 Section E Contract Modification No. 133

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    E Contract Modification No. 133 i PART I SECTION E INSPECTION AND ACCEPTANCE PAGE NO. E.1 - FAR 52.246-9 - INSPECTION OF RESEARCH AND DEVELOPMENT (SHORT FORM) (APR 1984) E-1 E.2 - CERTIFICATION E-1 Contract No. DE-AC02-07CH11358 Section E Contract Modification No.133 E-1 PART I SECTION E - INSPECTION AND ACCEPTANCE E.1 - FAR 52.246-9 - INSPECTION OF RESEARCH AND DEVELOPMENT (SHORT FORM) (APR 1984) The Government has the right to inspect and evaluate the work performed or being performed under

  5. Contract No. DE-AC02-07CH11358 Section F Contract Modification No. 0139

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Contract Modification No. 0139 i PART I SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS PAGE NO. F.1 - PERIOD OF PERFORMANCE F-1 F.2 - AWARD TERM INCENTIVE (SPECIAL) F-1 F.3 - FAR 52.242-15 - STOP WORK ORDER (AUG 1989) - ALTERNATE I (APR 1984) F-4 F.4 - STOP WORK AND SHUTDOWN AUTHORITY F-5 F.5 - PRINCIPAL PLACE OF PERFORMANCE F-5 Contract No. DE-AC02-07CH11358 Section F Contract Modification No. 0139 F-1 PART I SECTION F - DELIVERIES OR PERFORMANCE F.1 - PERIOD OF PERFORMANCE (a) This

  6. Contract No. DE-AC02-07CH11358 Section J Appendix H

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section J Appendix H Modification 0171 ATTACHMENT J.8 APPENDIX H SMALL BUSINESS SUBCONTRACTING PLAN Applicable to the Operation of AMES Laboratory Contract No. DE-AC02-07CH11358 A mAmes Laboratory Croltfng Motlr/6/o A E*orpy Sofulfono U.B . DEPAR'fld.£NT OF BNKD.OY This subcontracting plan was submitted by: Signature: Typed Name: Andrea Spiker Title: Purchasing Manag r Date Signed: IO(;J. }~ OJ'f I I Phone No.: 515-294-6738 Approval: Agency: Signature: Typed Name: Title: Contracting Officer ,

  7. Contract Number DE-AC27-08RV14800 Continuation Page, Modification 360

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Number DE-AC27-08RV14800 Continuation Page, Modification 360 Page 2 of 4 The following changes are hereby incorporated into the contract under the authority of Federal Acquisition Regulation (FAR) 52.243-2 Changes-Cost Reimbursement, at no additional cost to the Government. 1. Update Contract Section H-15(f), Key Personnel for this Contract, to update the list as follows: FROM: Name Position Mr. Lyden David Olson TOC Project Manager Mr. Robert E. Wilkinson Manager, ESH&Q Mr. Doug Greenwell

  8. ac response of thin superconductors in the flux-creep regime

    SciTech Connect (OSTI)

    Gurevich, A. [Applied Superconductivity Center, University of Wisconsin, Madison, Wisconsin 53706 (United States)] [Applied Superconductivity Center, University of Wisconsin, Madison, Wisconsin 53706 (United States); Brandt, E.H. [Max Planck Institute fuer Metallforschung, D-70506 Stuttgart (Germany)] [Max Planck Institute fuer Metallforschung, D-70506 Stuttgart (Germany)

    1997-05-01

    We calculate both analytically and numerically the ac susceptibility {chi}({omega}) and the nonlinear electromagnetic response of thin superconductor strips and disks of constant thickness in a perpendicular time-dependent magnetic field B{sub a}(t)=B{sub 0}cos{omega}t, taking account of the strong nonlinearity of the voltage-current characteristics below the irreversibility line. We consider integral equations of nonlinear nonlocal flux diffusion for a wide class of thermally activated creep models. It is shown that thin superconductors, despite being fully in the critical state, exhibit a universal Meissner-like electromagnetic response in the dissipative flux-creep regime. The expression for the linear ac susceptibility during flux creep appears to be similar to the susceptibility of Ohmic conductors, but with the relaxation time constant replaced by the time t elapsed after flux creep has started. This result is independent of any material parameter or temperature or dc field. For {omega}t{gt}1, we obtain {chi}({omega}){approx}{minus}1+pln(qi{omega}t)/(i{omega}t), where p and q are constants. Above a critical ac amplitude B{sub 0}=B{sub l}, the local response of the electric field becomes nonlinear, and there are two distinctive nonlinear regimes at B{sub 0}{gt}B{sub l}, where B{sub l}{approximately}s(d/a){sup 1/2}B{sub p}, B{sub p} is a characteristic field of full flux penetration, s(T,B)={vert_bar}dlnj/dlnt{vert_bar} is the dimensionless flux-creep rate and d and a are the sample thickness and width, respectively. For B{sub l}{lt}B{sub 0}{lt}B{sub h}({omega}) the response of the electric field is strongly nonlinear but nonhysteretic, since the ac field B{sub a}(t) does not cause a periodic inversion of the critical state. As a result, the magnetic moment exhibits a Meissner-like {ital nondissipative} response, in stark contrast to the Bean model. (Abstract Truncated)

  9. AC-magnetotransport of a 2DEG in the quantum Hall regime

    SciTech Connect (OSTI)

    Hernndez, C.; Chaubet, C.

    2014-05-15

    In this paper we present an ac-magneto-transport study of a two-dimensional electron gas (2DEG) in the quantum Hall effect (QHE) regime, for frequencies in the range [100Hz, 1MHz]. We present a new approach to understand admittance measurements based in the Landauer-Buttiker formalism for QHE edge channels and taking into account the capacitance and the topology of the cables connected to the contacts used in the measurements. Our model predicts an universal behavior with the a-dimensional parameter RC? where R is the 2 wires resistance of the 2DEG, C the capacitance cables and the angular frequency, in agreement with experiments.

  10. Contract No. DE-AC02-09CH11466 Section F

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modification No. 0164 Contract No. DE-AC02-09CH11466 Section F i PART I SECTION F DELIVERIES OR PERFORMANCE TABLE OF CONTENTS CLAUSE NO. TITLE OF CLAUSE F.1 PERIOD OF PERFORMANCE (Revised by Prime Contract Modification 041 - 07/13/2010; 0137 - 10/28/2013; 0164 - 08/07/2014) F.2 AWARD TERM INCENTIVE (SPECIAL) F.3 FAR 52.242-15 - STOP WORK ORDER (AUG 1989) ALTERNATE I (APR 1984) F.4 STOP WORK AND SHUTDOWN AUTHORITY F.5 PRINCIPAL PLACE OF PERFORMANCE Modification No. 0164 Contract No.

  11. PPPL engineers design and build state-of-the-art controller for AC to DC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    converter that manages plasma in upgraded fusion machine | Princeton Plasma Physics Lab PPPL engineers design and build state-of-the-art controller for AC to DC converter that manages plasma in upgraded fusion machine By Raphael Rosen March 7, 2016 Tweet Widget Google Plus One Share on Facebook PPPL scientists Robert Mozulay and Weiguo Que (Photo by Hans Schneider) PPPL scientists Robert Mozulay and Weiguo Que Gallery: One of the digital firing generators installed in NSTX-U (Photo by Hans

  12. Microsoft Word - DE-AC06-09RL15009 Section B.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    B Page B-1 Section B Supplies or Services and Prices Table of Contents Section Title Page No. B.1 Workers' Compensation Claims Administrative Services B-2 B.2 Obligation of Funds and Limitation of Government Financial Liability B-2 B.3 Schedule B-2 B.4 Reimbursable Expenses B-4 B.5 Payment of Performance Based Fee B-4 Workers' Compensation Claims Services Part I Contract No. DE-AC06-09RL15009 Section B Page B-2 B.1 Workers' Compensation Claims Administrative Services This is a fixed-unit price

  13. Microsoft Word - DE-AC06-09RL15009 Section D.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    D Page D-1 Section D Packaging and Marking Table of Contents Section Title Page No. D.1 Packaging D-2 D.2 Marking D-2 Workers' Compensation Claims Services Part I Contract No. DE-AC06-09RL15009 Section D Page D-2 D.1 Packaging Preservation, packaging, and packing for shipment or mailing of all work delivered hereunder shall be in accordance with good commercial practices and adequate to ensure acceptance by common carrier and safe transportation at the most economical rate(s). D.2 Marking a.

  14. Microsoft Word - DE-AC06-09RL15009 Section F.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    F Page F-1 Section F Deliveries and Performance Table of Contents Section Title Page No. F.1 Period of Performance F-2 F.2 Principal Place of Performance F-2 F.3 Reporting Requirements F-2 F.4 FAR 52.242-15 Stop-Work Order. (AUG 1989) F-4 F.5 FAR 52.242-17 Government Delay of Work. (APR 1984) F-5 Workers' Compensation Claims Services Part I Contract No.DE-AC06-09RL15009 Section F Page F-2 F.1 Period of Performance The period of performance (exclusive of the Transition Period) for the work

  15. Microsoft Word - DE-AC06-09RL15009 Section G.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    G Page G-1 Section G Contract Administration Plan Table of Contents Section Title Page No. G.1 Contract Administration G-2 G.2 Billing Instructions G-2 G.3 Modification Authority G-3 G.4 DEAR 952.242-70 Technical Direction (DEC 2000) G-3 G.5 Administrative Reporting Requirements G-5 Workers' Compensation Claims Services Part I Contract No. DE-AC06-09RL15009 Section G Page G-2 G.1 Contract Administration The DOE Contracting Officer and correspondence address is: Andrew H. Wirkkala, Contracting

  16. Microsoft Word - DE-AC06-09RL15009 Section J.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    III Contract No. DE-AC06-09RL15009 Section J Page J-1 Section J Part III - List of Attachments Table of Contents Section Title Page No. J.1 Covered Site Contractors/Sub-Contractors J-2 J.2 Hardware and Software System Requirements J-4 J.3 Wage Determination No. 2005-2569, Revision No. 8 J-5 J.4 Legal Management Plan J-16 (to be inserted 60 days after award) J.5 Continuity of Operations Plan J-17 (to be inserted 60 days after award) J.6 List of Applicable DOE Directives and Contractor

  17. Mission Support Contract Section J Contract No. DE-AC06-09RL14728

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    J-7-1 ATTACHMENT J-7 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM TARGETS Mission Support Contract Section J Contract No. DE-AC06-09RL14728 J-7-2 SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM TARGETS A. Mission Support Alliance, LLC NAICS Co d e De s c rip tio n o f NAICS S u b s e c to rs S DB Do lla rs P e rc e n ta g e * 531312 Nonresidential Property Managers $22,924,301 0.7 541614 Process, Physical Distribution and Logistics Consulting Services $22,953,821 0.8 541690 Scientific

  18. ESBWR response to an extended station blackout/loss of all AC power

    SciTech Connect (OSTI)

    Barrett, A. J.; Marquino, W.

    2012-07-01

    U.S. federal regulations require light water cooled nuclear power plants to cope with Station Blackouts for a predetermined amount of time based on design factors for the plant. U.S. regulations define Station Blackout (SBO) as a loss of the offsite electric power system concurrent with turbine trip and unavailability of the onsite emergency AC power system. According to U.S. regulations, typically the coping period for an SBO is 4 hours and can be as long as 16 hours for currently operating BWR plants. Being able to cope with an SBO and loss of all AC power is required by international regulators as well. The U.S. licensing basis for the ESBWR is a coping period of 72 hours for an SBO based on U.S. NRC requirements for passive safety plants. In the event of an extended SBO (viz., greater than 72 hours), the ESBWR response shows that the design is able to cope with the event for at least 7 days without AC electrical power or operator action. ESBWR is a Generation III+ reactor design with an array of passive safety systems. The ESBWR primary success path for mitigation of an SBO event is the Isolation Condenser System (ICS). The ICS is a passive, closed loop, safety system that initiates automatically on a loss of power. Upon Station Blackout or loss of all AC power, the ICS begins removing decay heat from the Reactor Pressure Vessel (RPV) by (i) condensing the steam into water in heat exchangers located in pools of water above the containment, and (ii) transferring the decay heat to the atmosphere. The condensed water is then returned by gravity to cool the reactor again. The ICS alone is capable of maintaining the ESBWR in a safe shutdown condition after an SBO for an extended period. The fuel remains covered throughout the SBO event. The ICS is able to remove decay heat from the RPV for at least 7 days and maintains the reactor in a safe shutdown condition. The water level in the RPV remains well above the top of active fuel for the duration of the SBO event. Beyond 7 days, only a few simple actions are needed to cope with the SBO for an indefinite amount of time. The operation of the ICS as the primary success path for mitigation of an SBO, allows for near immediate plant restart once power is restored. (authors)

  19. Los Alamos National Security, LLC Contract No. DE-AC52-06NA25396

    National Nuclear Security Administration (NNSA)

    Los Alamos National Security, LLC Contract No. DE-AC52-06NA25396 Attachment to Modification No. 150 PART III - SECTION J APPENDIX G October 5, 2010 [Modified by Modification No. A009, A015, A018, A019, A021, A027, M033, M041, M042, M046, M056, M062, M069, M078, M103, M133, 150] LIST OF APPLICABLE DIRECTIVES In addition to the list of applicable directives listed below, the Contractor shall also comply with supplementary directives, (e.g., manuals) which are invoked by a Contractor Requirements

  20. Modification No. M226 Contract No. DE-AC54-00AL66620

    National Nuclear Security Administration (NNSA)

    Modification No. M226 Contract No. DE-AC54-00AL66620 Page No. 2 of 2 The purpose of this Modification is to incorporate the following: A. Replace Part III, LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS, Section J - LIST OF ATTACHMENTS, Appendix A - PERSONNEL APPENDIX in its entirety to update REIMBURSEMENT AUTHORIZATIONS, TABLE OF CONTENTS, to add "I. Exempt Compensatory Time" and "J. Additional Bonus for Non-Key Personnel" to Section I. COMPENSATION SYSTEM, and to

  1. Comparative Study of DC and AC Microgrids in Commercial Buildings Across Different Climates and Operating Profiles: Preprint

    SciTech Connect (OSTI)

    Fregosi, D.; Ravula, S.; Brhlik, D.; Saussele, J.; Frank, S.; Bonnema, E.; Scheib, J.; Wilson, E.

    2015-04-22

    Bosch has developed and demonstrated a novel DC microgrid system designed to maximize utilization efficiency for locally generated photovoltaic energy while offering high reliability, safety, redundancy, and reduced cost compared to equivalent AC systems. Several demonstration projects validating the system feasibility and expected efficiency gains have been completed and additional ones are in progress. This work gives an overview of the Bosch DC microgrid system and presents key results from a large simulation study done to estimate the energy savings of the Bosch DC microgrid over conventional AC systems. The study examined the system performance in locations across the United States for several commercial building types and operating profiles and found that the Bosch DC microgrid uses generated PV energy 6%–8% more efficiently than traditional AC systems.

  2. Effect of AC target power on AlN film quality

    SciTech Connect (OSTI)

    Knisely, Katherine Grosh, Karl

    2014-09-01

    The influence of alternating current (AC) target power on film stress, roughness, and x-ray diffraction rocking curve full width half maximum (FWHM) was examined for AlN films deposited using S-gun magnetron sputtering on insulative substrates consisting of Si wafers with 575 nm thermal oxide. As the AC target power was increased from 5 to 8 kW, the deposition rate increased from 9.3 to 15.9 A/s, film stress decreased from 81 to −170 MPa, and the rocking curve FWHM increased from 0.98 to 1.03°. AlN film behavior is observed to change with target life; films deposited at 200 kWh target life were approximately 40 MPa more compressive and had 0.02° degree higher rocking curve FWHM values than films deposited at 130 kWh. AlN films deposited in two depositions were compared with films deposited in a single deposition, in order to better characterize the growth behavior and properties of AlN films deposited on an existing AlN film, which is not well understood. Two deposition films, when compared with single deposition films, showed no variation in residual stress trends or grain size behavior, but the average film roughness increased from 0.7 to 1.4 nm and rocking curve FWHM values increased by more than 0.25°.

  3. AC Resonant charger with charge rate unrelated to primary power frequency

    DOE Patents [OSTI]

    Watson, Harold

    1982-01-01

    An AC resonant charger for a capacitive load, such as a PFN, is provided with a variable repetition rate unrelated to the frequency of a multi-phase AC power source by using a control unit to select and couple the phase of the power source to the resonant charger in order to charge the capacitive load with a phase that is the next to begin a half cycle. For optimum range in repetition rate and increased charging voltage, the resonant charger includes a step-up transformer and full-wave rectifier. The next phase selected may then be of either polarity, but is always selected to be of a polarity opposite the polarity of the last phase selected so that the transformer core does not saturate. Thyristors are used to select and couple the correct phase just after its zero crossover in response to a sharp pulse generated by a zero-crossover detector. The thyristor that is turned on then automatically turns off after a full half cycle of its associated phase input. A full-wave rectifier couples the secondary winding of the transformer to the load so that the load capacitance is always charged with the same polarity.

  4. Plateau Remediation Contract Section J Contract No. DE-AC06-07RL14788 Modification No. 382

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modification No. 382 J 4-1 ATTACHMENT J.4 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) Plateau Remediation Contract Section J Contract No. DE-AC06-07RL14788 Modification No. 382 J 4-2 Fiscal Year 2015 Performance Evaluation and Measurement Plan For CH2MHill Plateau Remediation Company Performance Period: October 1, 2014 through September 30, 2015 Plateau Remediation Contract Section J Contract No. DE-AC06-07RL14788 Modification No. 382 J 4-3 TABLE OF CONTENTS PERFORMANCE EVALUATION AND

  5. COR-Y12-12/7/2012-21660 DE-AC05-00OR22800 DOE Form

    National Nuclear Security Administration (NNSA)

    COR-Y12-12/7/2012-21660 DE-AC05-00OR22800 DOE Form (04/1991) U.S. Department of Energy Requirements Change Notice No.: NNSA-49 Page 1 of 36 Pages PROJECT: Baseline List of Required Compliance Documents LOCATION: Oak Ridge, Tennessee CONTRACTOR: Babcock & Wilcox Technical Services Y-12, LLC CONTRACT NO.: DE-AC05-00OR22800, I.85, Laws, Regulations, and DOE Directives (December 2000), DEAR 970.5204-2 DATE OF CONTRACT: August 31, 2000 This Requirements Change Notice (RCN) No. NNSA-49

  6. DOE/OR/21548-193 CONTRACT NO. DE-AC05-860R21548 ANNUAL SITE ENVIRONMENTAL

    Office of Legacy Management (LM)

    548-193 CONTRACT NO. DE-AC05-860R21548 ANNUAL SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1990 Weldon Spring Site Remedial Action Project Weldon Spring, Missouri SEPTEMBER 1991 U.S. Department of Energy Oak Ridge Operations Office Weldon Spring Site Remedial Action Project REV. 1 DOE/OR/21548-193 CONTRACT NO. DE-AC05-860R21548 ANNUAL SITE ENVIRONMENTAL REPORT FOR CALENDAR YEAR 1990 Weldon Spring Site Remedial Action Project Weldon Spring, Missouri SEPTEMBER 1991 U.S. Department of Energy Oak

  7. The sluggs survey: HST/ACS mosaic imaging of the NGC 3115 globular cluster system

    SciTech Connect (OSTI)

    Jennings, Zachary G.; Romanowsky, Aaron J.; Brodie, Jean P.; Arnold, Jacob A.; Strader, Jay; Lin, Dacheng; Irwin, Jimmy A.; Wong, Ka-Wah; Sivakoff, Gregory R.

    2014-08-01

    We present Hubble Space Telescope/Advanced Camera for Surveys (HST/ACS) g and z photometry and half-light radii R {sub h} measurements of 360 globular cluster (GC) candidates around the nearby S0 galaxy NGC 3115. We also include Subaru/Suprime-Cam g, r, and i photometry of 421 additional candidates. The well-established color bimodality of the GC system is obvious in the HST/ACS photometry. We find evidence for a 'blue tilt' in the blue GC subpopulation, wherein the GCs in the blue subpopulation get redder as luminosity increases, indicative of a mass-metallicity relationship. We find a color gradient in both the red and blue subpopulations, with each group of clusters becoming bluer at larger distances from NGC 3115. The gradient is of similar strength in both subpopulations, but is monotonic and more significant for the blue clusters. On average, the blue clusters have ?10% larger R {sub h} than the red clusters. This average difference is less than is typically observed for early-type galaxies but does match that measured in the literature for the Sombrero Galaxy (M104), suggesting that morphology and inclination may affect the measured size difference between the red and blue clusters. However, the scatter on the R {sub h} measurements is large. We also identify 31 clusters more extended than typical GCs, which we term ultra-compact dwarf (UCD) candidates. Many of these objects are actually considerably fainter than typical UCDs. While it is likely that a significant number will be background contaminants, six of these UCD candidates are spectroscopically confirmed as NGC 3115 members. To explore the prevalence of low-mass X-ray binaries in the GC system, we match our ACS and Suprime-Cam detections to corresponding Chandra X-ray sources. We identify 45 X-ray-GC matches: 16 among the blue subpopulation and 29 among the red subpopulation. These X-ray/GC coincidence fractions are larger than is typical for most GC systems, probably due to the increased depth of the X-ray data compared to previous studies of GC systems.

  8. Controller for controlling operation of at least one electrical load operating on an AC supply, and a method thereof

    DOE Patents [OSTI]

    Cantin, Luc (Baie Comeau, CA); Deschenes, Mario (Baie Comeau, CA); D'Amours, Mario (Sept Iles, CA)

    1995-08-15

    A controller is provided for controlling operation of at least one electrical load operating on an AC supply having a typical frequency, the AC supply being provided via power transformers by an electrical power distribution grid. The controller is associated with the load and comprises an input interface for coupling the controller to the grid, a frequency detector for detecting the frequency of the AC supply and producing a signal indicative of the frequency, memory modules for storing preprogrammed commands, a frequency monitor for reading the signal indicative of the frequency and producing frequency data derived thereof, a selector for selecting at least one of the preprogrammed commands with respect to the frequency data, a control unit for producing at least one command signal representative of the selected preprogrammed commands, and an output interface including a device responsive to the command signal for controlling the load. Therefore, the load can be controlled by means of the controller depending on the frequency of the AC supply.

  9. Method and system for an on-chip AC self-test controller

    DOE Patents [OSTI]

    Flanagan, John D.; Herring, Jay R.; Lo, Tin-Chee

    2008-09-30

    A method and system for performing AC self-test on an integrated circuit that includes a system clock for use during normal operation are provided. The method includes applying a long data capture pulse to a first test register in response to the system clock, applying an at speed data launch pulse to the first test register in response to the system clock, inputting the data from the first register to a logic path in response to applying the at speed data launch pulse to the first test register, applying an at speed data capture pulse to a second test register in response to the system clock, inputting the logic path output to the second test register in response to applying the at speed data capture pulse to the second test register, and applying a long data launch pulse to the second test register in response to the system clock.

  10. Method and system for an on-chip AC self-test controller

    DOE Patents [OSTI]

    Flanagan, John D.; Herring, Jay R.; Lo, Tin-Chee

    2006-06-06

    A method for performing AC self-test on an integrated circuit, including a system clock for use during normal operation. The method includes applying a long data capture pulse to a first test register in response to the system clock, and further applying at an speed data launch pulse to the first test register in response to the system clock. Inputting the data from the first register to a logic path in response to applying the at speed data launch pulse to the first test register. Applying at speed data capture pulse to a second test register in response to the system clock. Inputting the output from the logic path to the second test register in response to applying the at speed data capture pulse to the second register. Applying a long data launch pulse to the second test register in response to the system clock.

  11. Test Results of the AC Field Measurements of Fermilab Booster Corrector Magnets

    SciTech Connect (OSTI)

    DiMarco, E.Joseph; Harding, D.J.; Kashikhin, V.S.; Kotelnikov, S.K.; Lamm, M.J.; Makulski, A.; Nehring, R.; Orris, D.F.; Schlabach, P.; Sylvester, C.; Tartaglia, Michael Albert; /Fermilab

    2008-06-25

    Multi-element corrector magnets are being produced at Fermilab that enable correction of orbits and tunes through the entire cycle of the Booster, not just at injection. The corrector package includes six different corrector elements--normal and skew orientations of dipole, quadrupole, and sextupole--each independently powered. The magnets have been tested during typical AC ramping cycles at 15Hz using a fixed coil system to measure the dynamic field strength and field quality. The fixed coil is comprised of an array of inductive pick-up coils around the perimeter of a cylinder which are sampled simultaneously at 100 kHz with 24-bit ADC's. The performance of the measurement system and a summary of the field results are presented and discussed.

  12. Microsoft Word - DE-AC06-09RL15009 Section I.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    II Contract No. DE-AC06-09RL15009 Section I Page I-1 Section I Part II - Contract Clauses Table of Contents Section Title Page No. I.1 FAR 52.252-2 Clauses Incorporated by Reference (Feb 1998) I-2 I.2 FAR 52.217-8 Option to Extend Services (Nov 1999) I-4 I.3 FAR 52.217-9 Option to Extend the Term of the Contract (Mar 2000) I-4 I.4 FAR 52.222-42 Statement of Equivalent Rates for Federal Hires (May 1989) I-4 I.5 DEAR 970.5204-2 Laws, Regulations and DOE Directives (Dec 2000) I-4 I.6 DEAR

  13. Utility-Scale Power Router: Dynamic Control of Grid Assets Using Direct AC Converter Cells

    SciTech Connect (OSTI)

    2010-09-01

    ADEPT Project: Georgia Tech is developing a cost-effective, utility-scale power router that uses an enhanced transformer to more efficiently direct power on the grid. Existing power routing technologies are too expensive for widespread use, but the ability to route grid power to match real-time demand and power outages would significantly reduce energy costs for utilities, municipalities, and consumers. Georgia Tech is adding a power converter to an existing grid transformer to better control power flows at about 1/10th the cost of existing power routing solutions. Transformers convert the high-voltage electricity that is transmitted through the grid into the low-voltage electricity that is used by homes and businesses. The added converter uses fewer steps to convert some types of power and eliminates unnecessary power storage, among other improvements. The enhanced transformer is more efficient, and it would still work even if the converter fails, ensuring grid reliability.

  14. Data:9f33a9f9-21ad-47b2-9b1f-4b3771f914ac | Open Energy Information

    Open Energy Info (EERE)

    ad-47b2-9b1f-4b3771f914ac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic...

  15. Data:C9125b18-da0a-4612-b0c6-3eb6421ac6c2 | Open Energy Information

    Open Energy Info (EERE)

    b0c6-3eb6421ac6c2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic...

  16. Applications of exact linearization techniques for steady-state stability enhancement in a weak ac/dc system

    SciTech Connect (OSTI)

    Kaprielian, S.; Clements, K. ); Turi, J. )

    1992-05-01

    A nonlinear control strategy to improve the steady-state stability of a weak AC/DC power system is presented. The approach described in this paper is based on the extension of feedback linearization techniques to nonlinear descriptor system models. This method produces a nonlinear control strategy which is capable of enhancing system performance for various system operating conditions. This claim is supported with simulation results.

  17. Occupational Health Services Part I DE-AC06-04RL14383, Modification No. 139 Section B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DE-AC06-04RL14383, Modification No. 139 Section B Page B-2 B.1 Occupational Medical Services a. This is a performance-based, cost reimbursement service contract for the rendering of Occupational Medical Services for the U. S. Department of Energy's Hanford Site. The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services (except as expressly set forth in this contract as furnished by the Government) and otherwise do all things necessary for, or incident

  18. Occupational Health Services Part I DE-AC06-04RL14383, Modification No. 171 Section B

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Occupational Health Services Part I DE-AC06-04RL14383, Modification No. 171 Section B Page B-2 B.1 Occupational Medical Services a. This is a performance-based, cost reimbursement service contract for the rendering of Occupational Medical Services for the U. S. Department of Energy's Hanford Site. The Contractor shall furnish all personnel, facilities, equipment, material, supplies, and services (except as expressly set forth in this contract as furnished by the Government) and otherwise do all

  19. The change in dielectric constant, AC conductivity and optical band gaps of polymer electrolyte film: Gamma irradiation

    SciTech Connect (OSTI)

    Raghu, S. Subramanya, K. Sharanappa, C. Mini, V. Archana, K. Sanjeev, Ganesh Devendrappa, H.

    2014-04-24

    The effects of gamma (?) irradiation on dielectric and optical properties of polymer electrolyte film were investigated. The dielectric constant and ac conductivity increases with ? dose. Also optical band gap decreased from 4.23 to 3.78ev after irradiation. A large dependence of the polymer properties on the irradiation dose was noticed. This suggests that there is a possibility of improving polymer electrolyte properties on gamma irradiation.

  20. Mission Support Contract Section J -4 Contract No. DE-AC06-09RL14728 Modification 145

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -4 Contract No. DE-AC06-09RL14728 Modification 145 J-4-1 ATTACHMENT J-4-b Mission Support Contract Performance Evaluation and Measurement Plan The Performance Evaluation and Measurement Plan (PEMP) details the administration of performance incentives and allocation of total available fee as defined in Section B, Supplies or Services and Prices/Costs. 1. PERFORMANCE INCENTIVES Each performance incentive will set forth the specific requirements, criteria and/or specifications for acceptable

  1. Mission Support Contract Section J-4 Contract No. DE-AC06-09RL14728 Modification 052

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC06-09RL14728 Modification 052 J-4-1 ATTACHMENT J-4 Mission Support Contract Performance Evaluation and Measurement Plan The Performance Evaluation and Measurement Plan (PEMP) details the administration of performance incentives and allocation of total available fee as defined in Section B, Supplies or Services and Prices/Costs. 1. PERFORMANCE MEASURES Each performance measure will set forth the specific requirements, criteria and/or specifications for acceptable performance of

  2. Crystal structure of the FLT3 kinase domain bound to the inhibitor quizartinib (AC220)

    SciTech Connect (OSTI)

    Zorn, Julie A.; Wang, Qi; Fujimura, Eric; Barros, Tiago; Kuriyan, John; Boggon, Titus J.

    2015-04-02

    More than 30% of acute myeloid leukemia (AML) patients possess activating mutations in the receptor tyrosine kinase FMS-like tyrosine kinase 3 or FLT3. A small-molecule inhibitor of FLT3 (known as quizartinib or AC220) that is currently in clinical trials appears promising for the treatment of AML. Here, we report the co-crystal structure of the kinase domain of FLT3 in complex with quizartinib. FLT3 with quizartinib bound adopts an “Abl-like” inactive conformation with the activation loop stabilized in the “DFG-out” orientation and folded back onto the kinase domain. This conformation is similar to that observed for the uncomplexed intracellular domain of FLT3 as well as for related receptor tyrosine kinases, except for a localized induced fit in the activation loop. The co-crystal structure reveals the interactions between quizartinib and the active site of FLT3 that are key for achieving its high potency against both wild-type FLT3 as well as a FLT3 variant observed in many AML patients. This co-complex further provides a structural rationale for quizartinib-resistance mutations.

  3. Method and apparatus for pulse width modulation control of an AC induction motor

    DOE Patents [OSTI]

    Geppert, Steven (Bloomfield Hills, MI); Slicker, James M. (Union Lake, MI)

    1984-01-01

    An inverter is connected between a source of DC power and a three-phase AC induction motor, and a micro-processor-based circuit controls the inverter using pulse width modulation techniques. In the disclosed method of pulse width modulation, both edges of each pulse of a carrier pulse train are equally modulated by a time proportional to sin .THETA., where .THETA. is the angular displacement of the pulse center at the motor stator frequency from a fixed reference point on the carrier waveform. The carrier waveform frequency is a multiple of the motor stator frequency. The modulated pulse train is then applied to each of the motor phase inputs with respective phase shifts of 120.degree. at the stator frequency. Switching control commands of electronic switches in the inverter are stored in a random access memory (RAM) and the locations of the RAM are successively read out in a cyclic manner, each bit of a given RAM location controlling a respective phase input of the motor. The DC power source preferably comprises rechargeable batteries and all but one of the electronic switches in the inverter can be disabled, the remaining electronic switch being part of a "flyback" DC-DC converter circuit for recharging the battery.

  4. Oscillation phenomena of a plasma produced by an AC driven hot cathode

    SciTech Connect (OSTI)

    Takahashi, Yuki; Miyamoto, Naoki; Kasuya, Toshiro; Wada, Motoi

    2012-11-06

    Amplitude of oscillating discharge current has been measured for Bernas-type ion source equipped with an alternating current heated hot tungsten filament cathode. Measurements have been made by changing the filament diameter from 0.2 mm to 0.7 mm, and by changing the DC discharge current from 0.1 A to 1.5 A. The fluctuation amplitude of the discharge current was found decreased as the diameter of the filament was enlarged. The fluctuation amplitude took the minimum value at a frequency from several hundred Hz to 1 kHz depending upon the filament diameter and DC discharge current. For example, the relative oscillation amplitude was the smallest at 1 kHz for 0.7 mm diameter filament. Increase in discharge current had reduced the minimum oscillation amplitude, and increased the frequency at which the oscillating amplitude took the minimum. Fundamental mechanisms relevant to these characteristics of oscillation amplitude of discharge current from an AC driven hot cathode filament are discussed.

  5. Crystal structure of the FLT3 kinase domain bound to the inhibitor quizartinib (AC220)

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Zorn, Julie A.; Wang, Qi; Fujimura, Eric; Barros, Tiago; Kuriyan, John; Boggon, Titus J.

    2015-04-02

    More than 30% of acute myeloid leukemia (AML) patients possess activating mutations in the receptor tyrosine kinase FMS-like tyrosine kinase 3 or FLT3. A small-molecule inhibitor of FLT3 (known as quizartinib or AC220) that is currently in clinical trials appears promising for the treatment of AML. Here, we report the co-crystal structure of the kinase domain of FLT3 in complex with quizartinib. FLT3 with quizartinib bound adopts an “Abl-like” inactive conformation with the activation loop stabilized in the “DFG-out” orientation and folded back onto the kinase domain. This conformation is similar to that observed for the uncomplexed intracellular domain ofmore » FLT3 as well as for related receptor tyrosine kinases, except for a localized induced fit in the activation loop. The co-crystal structure reveals the interactions between quizartinib and the active site of FLT3 that are key for achieving its high potency against both wild-type FLT3 as well as a FLT3 variant observed in many AML patients. This co-complex further provides a structural rationale for quizartinib-resistance mutations.« less

  6. THE ACS FORNAX CLUSTER SURVEY. VI. THE NUCLEI OF EARLY-TYPE GALAXIES IN THE FORNAX CLUSTER

    SciTech Connect (OSTI)

    Turner, Monica L.; Cote, Patrick; Ferrarese, Laura; Blakeslee, John P.; Jordan, Andres; Mei, Simona; Peng, Eric W.; West, Michael J.

    2012-11-15

    The Advanced Camera for Surveys (ACS) Fornax Cluster Survey is a Hubble Space Telescope program to image 43 early-type galaxies in the Fornax cluster, using the F475W and F850LP bandpasses of the ACS. We employ both one-dimensional and two-dimensional techniques to characterize the properties of the stellar nuclei in these galaxies, defined as the central 'luminosity excesses', relative to a Sersic model fitted to the underlying host. We find 72% {+-} 13% of our sample (31 galaxies) to be nucleated, with only three of the nuclei offset by more than 0.''5 from their galaxy photocenter, and with the majority of nuclei having colors bluer than their hosts. The nuclei are observed to be larger, and brighter, than typical Fornax globular clusters and to follow different structural scaling relations. A comparison of our results to those from the ACS Virgo Cluster Survey reveals striking similarities in the properties of the nuclei belonging to these different environments. We briefly review a variety of proposed formation models and conclude that, for the low-mass galaxies in our sample, the most important mechanism for nucleus growth is probably infall of star clusters through dynamical friction, while for higher mass galaxies, gas accretion triggered by mergers, accretions, and tidal torques is likely to dominate, with the relative importance of these two processes varying smoothly as a function of galaxy mass. Some intermediate-mass galaxies in our sample show a complexity in their inner structure that may be the signature of the 'hybrid nuclei' that arose through parallel formation channels.

  7. Gas sensing properties of magnesium doped SnO{sub 2} thin films in relation to AC conduction

    SciTech Connect (OSTI)

    Deepa, S.; Skariah, Benoy Thomas, Boben; Joseph, Anisha

    2014-01-28

    Conducting magnesium doped (0 to 1.5 wt %) tin oxide thin films prepared by Spray Pyrolysis technique achieved detection of 1000 ppm of LPG. The films deposited at 304 C exhibit an enhanced response at an operating temperature of 350 C. The microstructural properties are studied by means of X-ray diffraction. AC conductivity measurements are carried out using precision LCR meter to analyze the parameters that affect the variation in sensing. The results are correlated with compositional parameters and the subsequent modification in the charge transport mechanism facilitating an enhanced LPG sensing action.

  8. 1. CON'I'AC'r ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT II 11 3

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CON'I'AC'r ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT II 11 3 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE (M/D.'F) 4. REQUISITION/PURCHASE RE-Q. NO. S. PROJECT1 NO. t7fapplieoble) 27See Block 16C 12EM001839 6. ISUED13Y ODE7. ADMINISTER.ED BY (If uI/wr ius /tem 6) CODE U.S. Department of Energy Office or River Protection P. 0. Box 450, MS 146-60 Richland, WA 99352 1. NAME AND ADDRESS OF CONTRACTOR (No.,stree, county State and Z11' code) 9A, AMENDMEN f

  9. Plateau Remediation Contract Section J Contract No. DE-AC06-08RL14788 Attachment J.11, Revision 0

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CONTRACT LINE ITEM NUMBER (CLIN) ASSIGNMENT AGAINST CONTRACT STRUCTURE The table entitled, CONTRACT LINE ITEM NUMBER (CLIN) ASSIGNMENT AGAINST CONTRACT STRUCTURE, is included as a separate file. Plateau Remediation Contract Contract No. DE-AC06-08RL14788 ATTACHMENT J-11 CONTRACT LINE ITEM NUMBER (CLIN) ASSIGNMENT AGAINST CONTRACT STRUCTURE Section J Attachment J-11, Revision 2 PRC STATEMENT OF WORK SECTION ASSIGNED WBS ELEMENTS CLIN C.2.1 Transition 013.01 Project Management - PBS RL-13 1 C.2.1

  10. Occupational Health Services Part III Contract No. DE-AC06-04RL14383, Modification 142 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    III Contract No. DE-AC06-04RL14383, Modification 142 Section J Page J-11 J.3 Health Care Center Description There is a Health Care Center located in the 200 West Area of the Hanford Site, that is staffed by the Occupational Medical Contractor to provide first aid services to workers in the adjacent areas. The 200 West Facility is Government-Furnished. The Health Care Center consists of office space, examination/treatment rooms, storage rooms, etc. as shown on the floor plan in Figure J.3- 1,

  11. Occupational Health Services Part III Contract No. DE-AC06-04RL14383, Modification 152 Section J

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    III Contract No. DE-AC06-04RL14383, Modification 152 Section J Page J-13 J.6 List of Applicable Directives The Directives listed below can be obtained from the following websites: DOE Directives: http://www.directives.doe.gov/ DOE-RL CRD Supplements: http://idmsweb/idmsprod/livelink.exe?func=ll&objId=3423698&objAction=Open&viewType=1 Directive Identifier Title Date of Order or CRD CRD Supplement RRD 002 The Department of Energy Richland Operations Office (RL) Software Quality

  12. PREPARED FOR THE U.S. DEPARTMENT OF ENERGY, UNDER CONTRACT DE-AC02-76-CHO-3073

    Office of Scientific and Technical Information (OSTI)

    PREPARED FOR THE U.S. DEPARTMENT OF ENERGY, UNDER CONTRACT DE-AC02-76-CHO-3073 PPPL-2818 PPPL-2818 UC-422,427 THREE-DIMENSIONAL TOKAMAKEQUILIBRIA * INTHE PRESENCEOF RESONANTFIELDERRORS BY A. REIMANAND D. MONTICELLO January 1992 IDIRII_I['TO_I I_L.ABMA I_lYSmcl L.ABORATC)RY i NOTICE v, This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Govern,nent nor any agency thereof, nor any of their employees, makes any warranty,

  13. PREPARED FOR THE U.S. DEPARTMENT OF ENERGY, UNDER CONTRACT DE-AC02-76-CHO-3073

    Office of Scientific and Technical Information (OSTI)

    UNDER CONTRACT DE-AC02-76-CHO-3073 PPPL-3099 PPPL-3099 UC-427 & SINGULAR SURFACES IN THE OPEN FIELD LINE REGION OF A DIVERTED TOKAMAK BY A. REIMAN MAY 1995 PRINCETON PLASMA PHYSICS LABORATORY - - NOTICE J This report was prepared unt of work sponsored by an agency of the United States Government. Nei States Government nor any agency thereof, nor any of their mploye y, express or implied, or assumes any legal liability or responsibi , completeness, or usefulness of any information,

  14. NO. OF DOCUMENT BEING CONTINUED ~AE O CONTINUATION SHEET DE-AC27-08RV14800/061

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REFERENCE NO. OF DOCUMENT BEING CONTINUED ~AE O CONTINUATION SHEET DE-AC27-08RV14800/061 12 4 NAME OF OFFEROR OR CONTRACTOR WASHINGTON RIVER PROTECTION SOLUTIONS LLC ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) LIST OF CHANGES: Obligated Amount for this Modification: $ 1,7 86, 0 99.16 New Total Obligated Amount for this Award: $1, 126, 648,414.21 Incremental Funded Amount changed: from $1, 124,762,315.05 to $1, 126, 648,414.21 Account code: P&B Rocky

  15. Reliable, Efficient and Cost-Effective Electric Power Converter for Small Wind Turbines Based on AC-link Technology

    SciTech Connect (OSTI)

    Darren Hammell; Mark Holveck; DOE Project Officer - Keith Bennett

    2006-08-01

    Grid-tied inverter power electronics have been an Achilles heel of the small wind industry, providing opportunity for new technologies to provide lower costs, greater efficiency, and improved reliability. The small wind turbine market is also moving towards the 50-100kW size range. The unique AC-link power conversion technology provides efficiency, reliability, and power quality advantages over existing technologies, and Princeton Power will adapt prototype designs used for industrial asynchronous motor control to a 50kW small wind turbine design.

  16. Mission Support Contract Section B Contract No. DE-AC06-09RL14728 Modification 482483

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Support Contract Section B Contract No. DE-AC06-09RL14728 Modification 482483 B-1 Section B, Clause B.3, Obligation and Availability of Funds, is modified as follows: from: (a) Obligation of Funds. Pursuant to the Section I Clause entitled, FAR 52.232-22, Limitation of Funds, total funds in the amount of $1,825,349,363.00 have been allotted for obligation and are available for payment of services provided from the effective date of this Contract through May 25, 2017. to: (a) Obligation

  17. Mission Support Contract Section J Contract No. DE-AC06-09RL14728 Modification 157

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Page 1 of 2 Attachment J-16 Portfolio Management Task Order 12-001 Title: Project Management and Project Controls Services to the River Corridor Closure Project (RCCP) Revision Number: 02 Date: October 21, 2011 Start: October 1, 2011 Finish: September 30, 2012 1.0 DESCRIPTION Mission Support Alliance (MSA) will provide the following project management/project controls support services as described below. The services will be performed in accordance with Contract DE-AC06-09RL14728, C.2.5,

  18. Mission Support Contract Section J Contract No. DE-AC06-09RL14728 Modification 223

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    223 Attachment J-16 Portfolio Management Task Order 13-001 Title: Project Management and Project Controls Services to the River Corridor Closure Project (RCCP) Revision Number: 0 Date: September 05, 2012 Start: October 1, 2012 Finish: September 30, 2013 1.0 DESCRIPTION Mission Support Alliance (MSA) will provide the following project management/project controls support services as described below. The services will be performed in accordance with Contract DE-AC06-09RL14728, C.2.5, Portfolio

  19. Mission Support Contract Section J-16 Contract No. DE-AC06-09RL14728 Modification 478

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mission Support Contract Section J-16 Contract No. DE-AC06-09RL14728 Modification 478 Technical Proposal Portfolio Management Task Order 15-002 Title: Development of Dashboard Solutions for DOE-ORP Projects and Programs Phase 3 Revision Number: 2 Date: July 1, 2015 Start: July 1, 2015 Finish: December 31, 2015 1.0 DESCRIPTION Mission Support Alliance, LLC (MSA) Portfolio Management (PFM) will provide U.S. Department of Energy (DOE), Office of River Protection (ORP) support in the Development of

  20. Mission Support Contract Section J.16 Contract No. DE-AC06-09RL14728 Modification 459

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    No. DE-AC06-09RL14728 Modification 459 Page 1 of 2 Portfolio Management Task Order 15-004 Statement of Work Title: DOE-RL Nuclear Safety Division - Safety Basis Review and Approval Process SIA Revision Number: 0 Date: May 12, 2015 Start: May 18, 2015 Finish: June 30, 2015 1.0 DESCRIPTION Mission Support Alliance (MSA) will provide subject matter experts to provide facilitation and project management support for an Operating Excellence (OE) Structured Improvement Activity (SIA) for the Department

  1. Attachment to Modification M067 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620

    National Nuclear Security Administration (NNSA)

    M067 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620 PX-SEC-J (6-24-04).doc J-App. E-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J - LIST OF ATTACHMENTS APPENDIX E - LIST OF APPLICABLE DIRECTIVES June 24, 2004 Pursuant to the contract clause entitled "Laws, Regulations, and DOE Directives," the following list of Directives is applicable to this contract. Environmental, Safety, and Health (ES&H) requirements for work conducted under this contract have

  2. Attachment to Modification M125 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620

    National Nuclear Security Administration (NNSA)

    M125 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620 PX-SEC-J (01/16/07) J-App. E-1 PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J - LIST OF ATTACHMENTS APPENDIX E - LIST OF APPLICABLE DIRECTIVES January 16, 2007 Pursuant to the contract clause entitled "Laws, Regulations, and DOE Directives," the following list of directives is applicable to this contract. Environmental, Safety, and Health (ES&H) requirements for work conducted under this contract have

  3. Modification No. M081 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620

    National Nuclear Security Administration (NNSA)

    1 BWXT Pantex, LLC Contract No. DE-AC04-00AL66620 Page 2 of 4 1. This modification deletes Appendix D entitled, "Key Personnel," dated August 23, 2004, that is currently in Section J of the Contract and replaces it with Attachment 1, Appendix D entitled, "Key Personnel," dated December 23, 2004, of this Modification. 2. This modification deletes Contract Clause I 63. entitled, "DEAR 952.204-2 Security (SEP 1997)(Modified)," and replaces it with Contract Clause I 63.

  4. Developing 226Ra and 227Ac age-dating techniques for nuclear forensics to gain insight from concordant and non-concordant radiochronometers

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Kayzar, Theresa M.; Williams, Ross W.

    2015-09-26

    The model age or ‘date of purification’ of a nuclear material is an important nuclear forensic signature. In this study, chemical separation and MC-ICP-MS measurement techniques were developed for 226 Ra and 227Ac: grand-daughter nuclides in the 238U and 235U decay chains respectively. The 230Th-234U, 226Ra-238U, 231Pa-235U, and 227Ac-235U radiochronometers were used to calculate model ages for CRM-U100 standard reference material and two highly-enriched pieces of uranium metal from the International Technical Working Group Round Robin 3 Exercise. In conclusion, the results demonstrate the accuracy of the 226Ra-238U and 227Ac-235U chronometers and provide information about nuclide migration during uranium processing.

  5. Development of a New Class of Low Cost, High Frequency Link Direct DC to AC Converters for Solid Oxide Fuel Cells (SOFC)

    SciTech Connect (OSTI)

    Prasad Enjeti; J.W. Howze

    2003-12-01

    This project proposes to design and develop a new class of power converters (direct DC to AC) to drastically improve performance and optimize the cost, size, weight and volume of the DC to AC converter in SOFC systems. The proposed topologies employ a high frequency link; direct DC to AC conversion approach. The direct DC to AC conversion approach is more efficient and operates without an intermediate dc-link stage. The absence of the dc-link, results in the elimination of bulky, aluminum electrolytic capacitors, which in turn leads to a reduction in the cost, volume, size and weight of the power electronic converter. The feasibility of two direct DC to AC converter topologies and their suitability to meet SECA objectives will be investigated. Laboratory proto-type converters (3-5kW) will be designed and tested in Phase-1. A detailed design trade-off study along with the test results will be available in the form of a report for the evaluation of SECA Industrial partners. This project proposes to develop a new and innovative power converter technology suitable for Solid Oxide Fuel Cell (SOFC) power systems in accordance with SECA objectives. The proposed fuel cell inverter (FCI) employs state of the art power electronic devices configured in two unique topologies to achieve direct conversion of DC power (24-48V) available from a SOFC to AC power (120/240V, 60Hz) suitable for utility interface and powering stand alone loads. The primary objective is to realize cost effective fuel cell converter, which operates under a wide input voltage range, and output load swings with high efficiency and improved reliability.

  6. Management and Operating Contract for the Los Alamos National Laboratory, NNSA contract No. DE-AC52-06NA25396

    National Nuclear Security Administration (NNSA)

    MANAGEMENT AND OPERATING CONTRACT FOR THE LOS ALAMOS NATIONAL LABORATORY NATIONAL NUCLEAR SECURITY ADMINISTRATION CONTRACT No. DE-AC52-06NA25396 DECEMBER 21, 2005 1943 Today Blank Page Blank Page Request for Proposal No. DE-RP52-05NA25396 LANS Contract DE-AC52-06NA25396.doc Section B - H, Page 2 Part I - The Schedule Sections B through H TABLE OF CONTENTS STANDARD FORM 33 SOLICITATION, OFFER AND AWARD....................................... 1 Section B - SUPPLIES OR SERVICES AND PRICES/COSTS

  7. Causal Analysis of the Inadvertent Contact with an Uncontrolled Electrical Hazardous Energy Source (120 Volts AC)

    SciTech Connect (OSTI)

    David E. James; Dennis E. Raunig; Sean S. Cunningham

    2014-10-01

    On September 25, 2013, a Health Physics Technician (HPT) was performing preparations to support a pneumatic transfer from the HFEF Decon Cell to the Room 130 Glovebox in HFEF, per HFEF OI 3165 section 3.5, Field Preparations. This activity involves an HPT setting up and climbing a portable ladder to remove the 14-C meter probe from above ball valve HBV-7. The HPT source checks the meter and probe and then replaces the probe above HBV-7, which is located above Hood ID# 130 HP. At approximately 13:20, while reaching past the HBV-7 valve position indicator switches in an attempt to place the 14-C meter probe in the desired location, the HPTs left forearm came in contact with one of the three sets of exposed terminals on the valve position indication switches for HBV 7. This resulted in the HPT receiving an electrical shock from a 120 Volt AC source. Upon moving the arm, following the electrical shock, the HPT noticed two exposed electrical connections on a switch. The HPT then notified the HFEF HPT Supervisor, who in turn notified the MFC Radiological Controls Manager and HFEF Operations Manager of the situation. Work was stopped in the area and the hazard was roped off and posted to prevent access to the hazard. The HPT was escorted by the HPT Supervisor to the MFC Dispensary and then preceded to CFA medical for further evaluation. The individual was evaluated and released without any medical restrictions. Causal Factor (Root Cause) A3B3C01/A5B2C08: - Knowledge based error/Attention was given to wrong issues - Written Communication content LTA, Incomplete/situation not covered The Causal Factor (root cause) was attention being given to the wrong issues during the creation, reviews, verifications, and actual performance of HFEF OI-3165, which covers the need to perform the weekly source check and ensure placement of the probe prior to performing a rabbit transfer. This resulted in the hazard not being identified and mitigated in the procedure. Work activities with in HFEF-OI-3165 placed the HPT in proximity of an unmitigated hazard directly resulting in this event. Contributing Factor A3B3C04/A4B5C04: - Knowledge Based Error, LTA Review Based on Assumption That Process Will Not Change - Change Management LTA, Risks/consequences associated with change not adequately reviewed/assessed Prior to the pneumatic system being out of service, the probe and meter were not being source checked together. The source check issue was identified and addressed during the period of time when the system was out of service. The corrective actions for this issue resulted in the requirement that a meter and probe be source checked together as it is intended to be used. This changed the activity and required an HPT to weekly, when in use, remove and install the probe from above HBV-7 to meet the requirement of LRD 15001 Part 5 Article 551.5. Risks and consequences associated with this change were not adequately reviewed or assessed. Failure to identify the hazard associated with this change directly contributed to this event.

  8. Two ENERGY STAR Products Fail Testing

    Broader source: Energy.gov [DOE]

    DOE testing has identified two additional models of home appliances that do not meet the ENERGY STAR Program’s energy efficiency requirements.  A refrigerator manufactured by the Perlick...

  9. High-price energy strategy failing

    SciTech Connect (OSTI)

    Gonze, R.

    1981-03-01

    An energy policy based on decontrol and high energy prices to allocate resources is examined and found wanting. An economic penalty results when the oil companies can operate as a virtual monopoly to set prices for other fuels as well as oil. The impact on consumers is a lowered standard of living and social inequity. Government intervention that is pro-competition is shown to be as inadequate as price control. A list of twelve measures that would moderate the economic losses and still encourage energy production and conservation include strong antitrust action, an active federal coal leasing program, competitive coal transactions, limits on severance taxes, a permanent windfall profits tax, and direct subsidy programs. (DCK)

  10. Solid tags for identifying failed reactor components

    DOE Patents [OSTI]

    Bunch, Wilbur L. (Richland, WA); Schenter, Robert E. (Richland, WA)

    1987-01-01

    A solid tag material which generates stable detectable, identifiable, and measurable isotopic gases on exposure to a neutron flux to be placed in a nuclear reactor component, particularly a fuel element, in order to identify the reactor component in event of its failure. Several tag materials consisting of salts which generate a multiplicity of gaseous isotopes in predetermined ratios are used to identify different reactor components.

  11. Silicone injection restores failing submarine cables

    SciTech Connect (OSTI)

    Tilstra, M.

    1995-12-01

    Faced with the prospect of replacing nearly 10 miles of aging undersea cables, Orcas Power & Light Co (Opalco) elected instead to inject silicone into as many of the cables as possible. Silicone injection has been used extensively on underground residential distribution (URD) and feeder cables, but only two underwater cables had previously been injected: a feeder cable for Florida Power Corp under an intercoastal waterway and a cable for Washington Water Power Co under a lake in western Idaho. The compound restores power cables damaged by water treeing and prevents further water damage. Selection criteria included age, type, and whether the cables had ever been spliced. Older, soldered, hand-wrapped splices were avoided as they block the CableCure fluid from flowing through. This makes the cable uninjectable unless the splices are replaced with the molded type. The first cables chosen for injection were between 15 and 30 years old and clear of soldered splices. They also were free from faults. 4 figs.

  12. Efficacy of low level electric current (A-C) for controlling quagga mussles in the Welland Canal

    SciTech Connect (OSTI)

    Fears, C.; Mackie, G.L.

    1995-06-01

    The efficacy of systems (for which patents are pending) which use low-voltage A-C currents for preventing settlement and attachment by zebra mussels were tested with steel rods and plates placed near the intake of a pulp and paper plant in the Welland Canal at Thorold, Ontario. Six racks made of 16 ft. (4.9 m), 2x4s (5.1 x 10.2 cm) were placed into the Welland Canal on August 5, 1994. One rack had 1/8th in (3.2 mm) diam x 12 in (30.5 cm) long steel rods, each separated by 2 in (5.1 cm) attached to pressure treated wood and concrete blocks and an A-C current of 16 v (or 8 v/in); rack 2 had steel rods of the same configuration but 12 v (or 6 v/in) was applied; rack 3 was identical to these but no current was applied and was used as a rod control. The remaining three racks had steel plates, each plate being 3 in (7.6 cm) wide X 24 in (61 cm) long X 1/4 in (6.4 mm) thick and separated by 2 in (5.1 cm); one had 12 v applied (or 6 v/in), another had 16 v applied (or 8 v/in), and the third had no current and was used as a plate control. The racks were placed on the upstream and downstream side of the intake at a depth of about 7 ft (2.1 m) where the mussels populations were heaviest (as determined by SCUBA diving). All mussels were quagga mussels (Dreissena bugensis). The racks were pulled in mid November after settlement was complete and the results showed: (1) complete prevention of settlement of both new recruits and translocators at 8 volts/in with steel rods on both wood and concrete surfaces and with steel plate trash bars; (2) partial prevention of settlement at 6 volts/in with steel rods on both wood and concrete surfaces and steel plates; and (3) that, at current kilowatt hr rates, total efficacy at 8 volts/in would cost approximately $10.80/day/1000 sq ft using rods to protect concrete walls and about $16.32/day/1000 sq ft to protect 3 in wide x 1/4 in thick trash bars. These costs can be reduced even further with pulse dosed AC currents.

  13. Data:Caa5cce6-c6c8-4b7a-ac01-eb6abdf87c9b | Open Energy Information

    Open Energy Info (EERE)

    Caa5cce6-c6c8-4b7a-ac01-eb6abdf87c9b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading......

  14. Data:Eaa8368d-11ca-47bd-bb83-2fd1546e2ac0 | Open Energy Information

    Open Energy Info (EERE)

    Eaa8368d-11ca-47bd-bb83-2fd1546e2ac0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading......

  15. Volume_III_App_A_Figures_Chapter2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plains & Eastern EIS Figure 2.1-1: Converter Station General Layout 0 50 100 Miles OKLAHOMA ARKANSAS NE W M EX IC O T N COLORADO MISSOURI KANSAS MISSISSIPPI LOUISIANA TEXAS A R Arkansas AC Interconnection Siting Area Oklahoma AC Interconnection Siting Area Future Optima Substation Region 4 Link 3 Variation 2 Lee Creek Variation Oklahoma Converter Station Siting Area Arkansas Converter Station Siting Area Tennessee Converter Station Siting Area Region 1 Region 2 Region 3 Region 4 Region 5

  16. RCC Contract No. DE-AC06-05RL14655 TABLE B.2 SCHEDULE OF QUANTITIES AND TARGET COST

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract No. DE-AC06-05RL14655 TABLE B.2 SCHEDULE OF QUANTITIES AND TARGET COST Section B 593 CLIN 1 CLIN 2 CLIN 3 CLIN 4 100 Area 100-B/C Area FR - 100 B/C Area Design 1.03.01.04.01 Fld. Rem.-100 B/C Area Design 1 LS $702,783 $702,783 Confirmatory Sampling Sites 1.03.01.01.03 Fld. Rem.-Conf Sampling Sites-100 B/C 10 EA $838,517 $838,517 Liquid Waste Site Remediation 1.03.01.02.04 Fld. Rem.-Liquid Waste Sites-100-BC-1 0 TONS $322,870 $322,870 Waste Site Remediation 1.03.01.02.05 / 1.03.01.03.05

  17. PREPARED FOR THE U.S. DEPARTMENT OF ENERGY, UNDER CONTRACT DE-AC02-76-CHO-3073

    Office of Scientific and Technical Information (OSTI)

    r/0*O> PREPARED FOR THE U.S. DEPARTMENT OF ENERGY, UNDER CONTRACT DE-AC02-76-CHO-3073 PPPL-2760 UC-421,427 PPPL-2760 TOKAMAK ERROR FIELDS AND LOCKED MODES BY A. REIMAN AND D. MONTICELLO May 1991 P B I N C I T O N | P L A S M A P H Y S I C S I L A I O R A T Q R V I 1 sr-JiL-tK'- PRINCETON UNIVERSITY, PRINCETON, NEW JERSEY * U I 1 \^{~ r l * l A - ' i - U M L N l JS (JIVLilViif^O NOTICE This report was prepared as an account of work sponsored by an agency of the United States Government.

  18. BWXT/B&W Pantex Contract No. DE-AC04-00AL66620 FY BUDGET

    National Nuclear Security Administration (NNSA)

    BWXT/B&W Pantex Contract No. DE-AC04-00AL66620 FY BUDGET (LAB TABLE) ESTIMATED COST AWARD FEE AVAILABLE WFO FEE AVAILABLE (Estimated) AVAILABLE FEE FROM OTHER REIMBURSABLE WORK (Estimated) AWARD FEE EARNED WFO FEE EARNED EARNED FEE FROM OTHER REIMBURSABLE WORK 2011 533,140,000 498,262,000 34,878,000 276,000 127,000 2010 575,020,000 537,402,000 37,618,000 278,000 120,000 35,930,423 270,406 125,005 2009 511,744,000 478,265,421 33,478,579 224,634 91,932 31,815,053 207,296 192,086 2008

  19. ELECTRICAL SUBSTATION RELIABILITY EVALUATION WITH EMPHASIS ON EVOLVING INTERDEPENDENCE ON COMMUNICATION INFRASTRUCTURE.

    SciTech Connect (OSTI)

    AZARM,M.A.BARI,R.A.MUSICKI,Z.

    2004-01-15

    The objective of this study is to develop a methodology for a probabilistic assessment of the reliability and security of electrical energy distribution networks. This includes consideration of the future grid system, which will rely heavily on the existing digitally based communication infrastructure for monitoring and protection. Another important objective of this study is to provide information and insights from this research to Consolidated Edison Company (Con Edison) that could be useful in the design of the new network segment to be installed in the area of the World Trade Center in lower Manhattan. Our method is microscopic in nature and relies heavily on the specific design of the portion of the grid being analyzed. It extensively models the types of faults that a grid could potentially experience, the response of the grid, and the specific design of the protection schemes. We demonstrate that the existing technology can be extended and applied to the electrical grid and to the supporting communication network. A small subsection of a hypothetical grid based on the existing New York City electrical grid system of Con Edison is used to demonstrate the methods. Sensitivity studies show that in the current design the frequency for the loss of the main station is sensitive to the communication network reliability. The reliability of the communication network could become a more important contributor to the electrical grid reliability as the utilization of the communication network significantly increases in the near future to support ''smart'' transmission and/or distributed generation. The identification of potential failure modes and their likelihood can support decisions on potential modifications to the network including hardware, monitoring instrumentation, and protection systems.

  20. Energy Conservation Program of the Division of Substation and Control Engineering : An Interim Report.

    SciTech Connect (OSTI)

    ,

    1981-04-01

    Energy conservation projects undertaken by BPA that could benefit residential and commercial users and development of prototype equipment are described. Progress reports are presented and directions that the projects will take are indicated. The first projects presented are those being done at BPA's Midway Residential Community: studies on air infiltration and weatherization, and evaluation of such energy conservation measures as heat pump and solar water heaters. The next section involves an energy audit and retrofit program undertaken to reduce energy consumption in BPA's own buildings. The third section, also concerned with BPA's efforts to reduce internal energy consumption, presents the application of passive solar techniques to the design of new BPA buildings. The fourth section reports on a system developed to utilize waste thermal energy from transformers and solar energy for space heating and cooling. The fifth section also involves the development of a prototype system, one to monitor energy usage of industrial equipment. The final sections report on projects involving solar and wind energy, the Photovoltaic Applications Program, and the Mod-2 Wind Generator project at Goodnoe Hills. (MCW)

  1. Screening Level Characterization of Electrical Substation 411. DOE/OR/21548-154.

    Office of Legacy Management (LM)

  2. Microsoft PowerPoint - one line pdfs for 1222.pptx

    Broader source: Energy.gov (indexed) [DOE]

    Preliminary One-Line Drawings Future Optima Substation Modified Shelby Substation

  3. EIS-0107: Mead-Phoenix +500-kV Direct Current Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) prepared this statement to analyze the potential environmental and socioeconomic impacts arising from WAPA and regional project sponsors’ proposal to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC), connecting the Westwing Substation, located north of Phoenix, Arizona, with a new McCullough II Substation, located approximately 14 miles west of Boulder City, Nevada. This statement modifies a previously prepared federal statement from which the participants' election to proceed had not occurred at the time this statement was prepared.

  4. THE HST/ACS COMA CLUSTER SURVEY. VIII. BARRED DISK GALAXIES IN THE CORE OF THE COMA CLUSTER

    SciTech Connect (OSTI)

    Marinova, Irina; Jogee, Shardha; Weinzirl, Tim; Erwin, Peter; Trentham, Neil; Ferguson, Henry C.; Goudfrooij, Paul; Hammer, Derek; Den Brok, Mark; Peletier, Reynier F.; Kleijn, Gijs V.; Graham, Alister W.; Carter, David; Mouhcine, Mustapha; Balcells, Marc; Guzman, Rafael; Hoyos, Carlos; Mobasher, Bahram; Peng, Eric W. E-mail: sj@astro.as.utexas.edu

    2012-02-20

    We use high-resolution ({approx}0.''1) F814W Advanced Camera for Surveys (ACS) images from the Hubble Space Telescope ACS Treasury survey of the Coma cluster at z {approx} 0.02 to study bars in massive disk galaxies (S0s), as well as low-mass dwarf galaxies in the core of the Coma cluster, the densest environment in the nearby universe. Our study helps to constrain the evolution of bars and disks in dense environments and provides a comparison point for studies in lower density environments and at higher redshifts. Our results are: (1) we characterize the fraction and properties of bars in a sample of 32 bright (M{sub V} {approx}< -18, M{sub *} > 10{sup 9.5} M{sub Sun }) S0 galaxies, which dominate the population of massive disk galaxies in the Coma core. We find that the measurement of a bar fraction among S0 galaxies must be handled with special care due to the difficulty in separating unbarred S0s from ellipticals, and the potential dilution of the bar signature by light from a relatively large, bright bulge. The results depend sensitively on the method used: the bar fraction for bright S0s in the Coma core is 50% {+-} 11%, 65% {+-} 11%, and 60% {+-} 11% based on three methods of bar detection, namely, strict ellipse fit criteria, relaxed ellipse fit criteria, and visual classification. (2) We compare the S0 bar fraction across different environments (the Coma core, A901/902, and Virgo) adopting the critical step of using matched samples and matched methods in order to ensure robust comparisons. We find that the bar fraction among bright S0 galaxies does not show a statistically significant variation (within the error bars of {+-}11%) across environments which span two orders of magnitude in galaxy number density (n {approx} 300-10,000 galaxies Mpc{sup -3}) and include rich and poor clusters, such as the core of Coma, the A901/902 cluster, and Virgo. We speculate that the bar fraction among S0s is not significantly enhanced in rich clusters compared to low-density environments for two reasons. First, S0s in rich clusters are less prone to bar instabilities as they are dynamically heated by harassment and are gas poor as a result of ram pressure stripping and accelerated star formation. Second, high-speed encounters in rich clusters may be less effective than slow, strong encounters in inducing bars. (3) We also take advantage of the high resolution of the ACS ({approx}50 pc) to analyze a sample of 333 faint (M{sub V} > -18) dwarf galaxies in the Coma core. Using visual inspection of unsharp-masked images, we find only 13 galaxies with bar and/or spiral structure. An additional eight galaxies show evidence for an inclined disk. The paucity of disk structures in Coma dwarfs suggests that either disks are not common in these galaxies or that any disks present are too hot to develop instabilities.

  5. River Corridor Closure Contract Section J, Attachment J-2 Contract No. DE-AC06-05RL14655 Modification 627

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Contract No. DE-AC06-05RL14655 Modification 627 1 SECTION J, ATTACHMENT J-2 DOE DIRECTIVES APPLICABLE TO THE RIVER CORRIDOR CLOSURE CONTRACT The DOE Directives found in the following list constitute the List B - List of Applicable Directives, referenced in the Section I clause entitled Laws, Regulations, and DOE Directives. The Contractor should follow the established procedure to obtain relief from requirements of these directives where applicable. It is anticipated during the performance of

  6. Permanent Mold Casting of JIS-AC4C Aluminum Alloy Using a Low-Temperature Mold

    SciTech Connect (OSTI)

    Yamagata, Hiroshi; Nikawa, Makoto

    2011-01-17

    Permanent mold casting using mold temperatures below 200 deg. C was conducted to obtain a high-strength, thin-walled casting. Al-7.36 mass% Si -0.18 Cu- 0.27Mg-0.34Fe alloy JIS-AC4C was cast using a bottom pouring cast plan. The product had a rectangular tube shape (70 mm W x 68 mm D x 180 mm H) with wall thicknesses of 1, 3 and 5 mm. The effect of heat insulation at the melt path was compared when using a sand runner insert and when using a steel runner insert as well as a powder mold release agent. Fine microstructures were observed in the casting. The smaller the thickness, the higher the hardness with smaller secondary dendrite arm spacing (SDAS). However, the hardness and the SDAS were unaffected by the mold temperature. It was proposed that the avoidance of the formation of primary {alpha} dendrite at the melt path generates a higher strength casting with adequate mold filling.

  7. REFERENCE NO. OF DOCUMENT BEING CONTINUED AEO CONTINUATION SHEET DE-AC27-08RV14800/039 2AG O2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OTHER REFERENCE NO. OF DOCUMENT BEING CONTINUED AEO CONTINUATION SHEET DE-AC27-08RV14800/039 2AG O2 NAME OF OFFEROR OR CONTRACTOR WASHINGTON RIVER PROTECTION SOLUTIONS LLC QATT I NTPIEAON ITEM NO. SUPPLIESISERVICESQUNIYNT UITPCEAOT (A) (B) (C) (D) (E) (F) Fund 01050 Appr Year 2010 Allottee 34 Reporting Entity 421301 Amount: $43,752,060.00 Account code: P&B Rocky Flats Post Retirement Benefits Fund 01050 Appr Year 2010 Allottee 34 Reporting Entity 421301 Amount: $51,480,000.00 Account,_code:

  8. REFERENCE NO. OF DOCUMENT BEING CONTINUED AEO CONTINUATION SHEET DE-AC27-08RV14800/057 2G OF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SHEET DE-AC27-08RV14800/057 2G OF NAME OF OFFEROR OR CO NTRACTOR WASHINGTON RIVER PROTECTION SOLUTIONS LLC________________ ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT (A) (B) (C) (D) (E) (F) NEW ACCOUNTING CODE ADDED: Account code: WRPS Spares Account Fund D1250 Appr Year 2010 Allottee 34 Reporting Entity 421301 Object Class 25200 Program 1110909 Project 0D01481 WFO D0DD0D0 Local Use 0421405 Amount: $1,80D,000.00 Account code: WEIPS Fund 01250 Appr Year 2010 Allottee 34 Reporting

  9. REFERENCE NO. OF DOCUMENT BEING CONTINUED AEO CONTINUATION SHEETI DE-AC27-08RV14800/075 [AG OF

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SHEETI DE-AC27-08RV14800/075 [AG OF NAME OF OFFEROR OR CONTRACTOR WASHINGTON RIVER PROTECTION SOLUTIONS LLC ITEM NO. SUPPLIES/SERVICES QUANTITY JNIT UNIT PRICE AMOUNT (A) j(B) (C) (D) (E) (F) Account code: Fund 01250 Appr Year 2ulu Allottee 34 Reporting Entity 421301 Object Class 25200 Program 1110909 Project 0001481 WFO 0000000 Local Use 0000000 Amount: $5,918,827.27 Account code: WTP Support Funding for RFS OWTPO1 Fund 01250 Appr Year 2010 Allottee 34 R eporting Entity 421301 uuj1JeLu

  10. Audit of Incurred Costs for UT-Battelle under Department of Energy Contract No. DE-AC05-00OR22725 during Fiscal Year 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Audit Report Audit of Incurred Costs for UT- Battelle under Department of Energy Contract No. DE-AC05-00OR22725 during Fiscal Year 2012 OAS-M-14-05 April 2014 Department of Energy Washington, DC 20585 April 21, 2014 MEMORANDUM FOR THE MANAGER, OAK RIDGE NATIONAL LABORATORY SITE OFFICE FROM: Rickey R. Hass Deputy Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Audit of Incurred Costs for UT- Battelle under Department of Energy

  11. Performance Evaluation Plan (PEP) Pantex Plant Babcock & Wilcox Technical Services Pantex, LLC Contract No. DE-AC54-00AL66620

    National Nuclear Security Administration (NNSA)

    2 Performance Evaluation Plan (PEP) Pantex Plant Babcock & Wilcox Technical Services Pantex, LLC Contract No. DE-AC54-00AL66620 October 1, 2011 to September 30, 2012 A. Pursuant to the terms and conditions of the Contract, this Performance Evaluation Plan (PEP) sets forth the criteria upon which the Contractor's performance of work under the contract will be evaluated and upon which the determination of the total available fee amount earned shall be based. B. The base PEP is composed of

  12. AC 95 - selected readings

    SciTech Connect (OSTI)

    1995-12-31

    Reports are presented on energy efficiency and conservation in residential buildings. Topics include housing and energy linkages; the people factor; low-income initiatives; green visions; utility programs; affordable comfort; housing as a system; and pressures and air flow in buildings.

  13. Development of a low-cost integrated 20-kW-AC solar tracking subarray for grid-connected PV power system applications. Final technical report

    SciTech Connect (OSTI)

    Stern, M.; Duran, G.; Fourer, G.; Mackamul, K.; Whalen, W.; Loo, M. van; West, R.

    1998-06-01

    This report chronicles Utility Power Group's (UPG) successful two-year Photovoltaic Manufacturing Technology (PVMaT) Phase 4A1 work effort which began in July, 1995. During this period, UPG completed design, fabrication, testing and demonstration of a modular and fully integrated 15-kW-ac, solar tracking PV power system sub-array. The two key and innovative components which were developed are a Modular Panel which optimizes factory assembly of PV modules into a large area, field-deployable, structurally-integrated PV panel, and an Integrated Power Processing Unit which combines all dc and ac power collection, conversion and control functions within a single, field-deployable structurally-integrated electrical enclosure. These two key sub-array elements, when combined with a number of other electrical, mechanical, and structural components, create a low-cost and high-performance PV power system. This system, or sub-array, can be deployed in individual units, or paralleled with any number of other sub-arrays, to construct multi-megawatt P fields. 21 figs.

  14. EIS-0285-SA-147: Supplement Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis Transmission System Vegetation Management Program Vegetation Management for the Big Eddy-Chenoweth NO. 1 and 2 Substation to Substation, Big Eddy - Midway Substation to 2...

  15. Subunit compositions of Arabidopsis RNA polymerases I and III reveal Pol I- and Pol III-specific forms of the AC40 subunit and alternative forms of the C53 subunit

    SciTech Connect (OSTI)

    Ream, Thomas S.; Haag, Jeremy R.; Pontvianne, Frederic; Nicora, Carrie D.; Norbeck, Angela D.; Pasa-Tolic, Ljiljana; Pikaard, Craig S.

    2015-05-02

    Using affinity purification and mass spectrometry, we identified the subunits of Arabidopsis thaliana multisubunit RNA Polymerases I and III (abbreviated as Pol I and Pol III), providing the first description of their physical compositions in plants. AC40 and AC19 subunits are typically common to Pol I (a.k.a. Pol A) and Pol III (a.k.a. Pol C) and are encoded by single genes whose mutation, in humans, is a cause of the craniofacial disorder, Treacher-Collins Syndrome. Surprisingly, A. thaliana, and related species, express two distinct AC40 paralogs, one of which assembles into Pol I and the other of which assembles into Pol III. Changes at eight amino acid positions correlate with this functional divergence of Pol I and Pol III-specific AC40 paralogs. Two genes encode homologs of the yeast C53 subunit, and either variant can assemble into Pol III. By contrast, only one of two potential C17 variants, and one of two potential C31 variants were detected in Pol III. We introduce a new nomenclature system for plant Pol I and Pol III subunits in which the twelve subunits that are structurally and functionally homologous among Pols I through V are assigned equivalent numbers.

  16. Subunit compositions of Arabidopsis RNA polymerases I and III reveal Pol I- and Pol III-specific forms of the AC40 subunit and alternative forms of the C53 subunit

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ream, Thomas S.; Haag, Jeremy R.; Pontvianne, Frederic; Nicora, Carrie D.; Norbeck, Angela D.; Pasa-Tolic, Ljiljana; Pikaard, Craig S.

    2015-05-02

    Using affinity purification and mass spectrometry, we identified the subunits of Arabidopsis thaliana multisubunit RNA Polymerases I and III (abbreviated as Pol I and Pol III), providing the first description of their physical compositions in plants. AC40 and AC19 subunits are typically common to Pol I (a.k.a. Pol A) and Pol III (a.k.a. Pol C) and are encoded by single genes whose mutation, in humans, is a cause of the craniofacial disorder, Treacher-Collins Syndrome. Surprisingly, A. thaliana, and related species, express two distinct AC40 paralogs, one of which assembles into Pol I and the other of which assembles into Polmore » III. Changes at eight amino acid positions correlate with this functional divergence of Pol I and Pol III-specific AC40 paralogs. Two genes encode homologs of the yeast C53 subunit, and either variant can assemble into Pol III. By contrast, only one of two potential C17 variants, and one of two potential C31 variants were detected in Pol III. We introduce a new nomenclature system for plant Pol I and Pol III subunits in which the twelve subunits that are structurally and functionally homologous among Pols I through V are assigned equivalent numbers.« less

  17. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  18. TITLE AUTHORS SUBJECT SUBJECT RELATED DESCRIPTION PUBLISHER AVAILABILI...

    Office of Scientific and Technical Information (OSTI)

    TRANSMISSION AND DISTRIBUTION POWER SUBSTATIONS CAPITALIZED COST CALCULATION METHODS PLANNING COST ESTIMATION MATHEMATICAL MODELS The displacement or deferral of substation...

  19. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED COST; CALCULATION METHODS; PLANNING; COST ESTIMATION; MATHEMATICAL MODELS",,"The displacement or deferral of substation...

  20. Developing 226Ra and 227Ac age-dating techniques for nuclear forensics to gain insight from concordant and non-concordant radiochronometers

    SciTech Connect (OSTI)

    Kayzar, Theresa M.; Williams, Ross W.

    2015-09-26

    The model age or ‘date of purification’ of a nuclear material is an important nuclear forensic signature. In this study, chemical separation and MC-ICP-MS measurement techniques were developed for 226 Ra and 227Ac: grand-daughter nuclides in the 238U and 235U decay chains respectively. The 230Th-234U, 226Ra-238U, 231Pa-235U, and 227Ac-235U radiochronometers were used to calculate model ages for CRM-U100 standard reference material and two highly-enriched pieces of uranium metal from the International Technical Working Group Round Robin 3 Exercise. In conclusion, the results demonstrate the accuracy of the 226Ra-238U and 227Ac-235U chronometers and provide information about nuclide migration during uranium processing.

  1. THE STAR FORMATION HISTORY OF THE VERY METAL-POOR BLUE COMPACT DWARF I Zw 18 FROM HST/ACS DATA

    SciTech Connect (OSTI)

    Annibali, F.; Cignoni, M.; Tosi, M.; Clementini, G.; Contreras Ramos, R.; Fiorentino, G.; Van der Marel, R. P.; Aloisi, A.; Marconi, M.; Musella, I.

    2013-12-01

    We have derived the star formation history (SFH) of the blue compact dwarf galaxy I Zw 18 through comparison of deep HST/ACS data with synthetic color-magnitude diagrams (CMDs). A statistical analysis was implemented for the identification of the best-fit SFH and relative uncertainties. We confirm that I Zw 18 is not a truly young galaxy, having started forming stars earlier than ?1 Gyr ago, and possibly at epochs as old as a Hubble time. In I Zw 18's main body we infer a lower limit of ?2 10{sup 6} M {sub ?} for the mass locked up in old stars. I Zw 18's main body has been forming stars very actively during the last ?10 Myr, with an average star formation rate (SFR) as high as ?1 M {sub ?} yr{sup 1} (or ?2 10{sup 5} M {sub ?} yr{sup 1} pc{sup 2}). On the other hand, the secondary body was much less active at these epochs, in agreement with the absence of significant nebular emission. The high current SFR can explain the very blue colors and the high ionized gas content in I Zw 18, resembling primeval galaxies in the early universe. Detailed chemical evolution models are required to quantitatively check whether the SFH from the synthetic CMDs can explain the low measured element abundances, or if galactic winds with loss of metals are needed.

  2. Support for a special symposium to highlight the research of early career women physical chemists at the 2011 fall ACS nationall meeting, Aug 28-Sept

    SciTech Connect (OSTI)

    Geraldine Richmond

    2012-12-19

    The symposium was well attended during the 4-day symposium. The invited speakers were primarily women in early career stage (~4-8 years) with a few senior women and men as invited speakers or session chairs. Included in each day was a Poster Session for graduate students and a lunch in which the turn out was strong and the posters presented encouraged much of dialogue with the invited speakers, guests and others attending the ACS meeting and wanted to discuss the student???????????????¢????????????????????????????????s research and meet with the speakers. Most all speakers and participants were very positive about the sessions and expressed that the funding to cover some expenses made it possible for them to attend the conference and the poster session luncheon. There was a total of 51 presenters, below are the speakers and their abstracts, in order presented:

  3. Selection Tests of MnZn and NiZn Ferrites for Mu2e 300 kHz and 5.1 MHz AC Dipoles

    SciTech Connect (OSTI)

    Bourkland, K.; Elementi, L.; Feher, S.; Harding, D.J.; Kashikhin, V.S.; Makarov, A.; Pfeffer, H.; Velev, G.V.; Mulushev, E.; Iedmeska, I.; Venturini, M.; /Pisa U.

    2011-09-09

    Mu2e, a charged lepton flavor violation (CLFV) experiment is planned to start at Fermilab late in this decade. The proposed experiment will search for neutrinoless muon to electron conversions with unprecedented sensitivity, better than 6 x 10{sup -17 }at 90% CL. To achieve this sensitivity the incoming proton beam must be highly suppressed during the window for detecting the muon decays. The current proposal for beam extinction is based on a collimator design with two dipoles running at {approx}300 kHz and 5.1 MHz and synchronized to the proton bunch spacing. The appropriate choice of ferrite material for the magnet yoke is a critical step in the overall design of the dipoles and their reliable operation at such high frequencies over the life of the experiment. This choice, based on a series of the thermal and magnetic measurements of the ferrite samples, is discussed in the paper. Additionally, the first results from the testing at 300 kHz of a prototype AC dipole are presented.

  4. CURVATURE-DRIFT INSTABILITY FAILS TO GENERATE PULSAR RADIO EMISSION

    SciTech Connect (OSTI)

    Kaganovich, Alexander; Lyubarsky, Yuri

    2010-10-01

    The curvature-drift instability has long been considered as a viable mechanism for pulsar radio emission. We reconsidered this mechanism by finding an explicit solution describing the propagation of short electromagnetic waves in a plasma flow along curved magnetic field lines. We show that even though the waves could be amplified, the amplification factor remains very close to unity; therefore, this mechanism is unable to generate high brightness temperature emission from initial weak fluctuations.

  5. Fail safe controllable output improved version of the Electromechanical battery

    DOE Patents [OSTI]

    Post, Richard F. (Walnut Creek, CA)

    1999-01-01

    Mechanical means are provided to control the voltages induced in the windings of a generator/motor. In one embodiment, a lever is used to withdraw or insert the entire stator windings from the cavity where the rotating field exists. In another embodiment, voltage control and/or switching off of the output is achievable with a variable-coupling generator/motor. A stator is made up of two concentric layers of windings, with a larger number of turns on the inner layer of windings than the outer layer of windings. The windings are to be connected in series electrically, that is, their voltages add vectorially. The mechanical arrangement is such that one or both of the windings can be rotated with respect to the other winding about their common central axis. Another improved design for the stator assembly of electromechanical batteries provides knife switch contacts that are in electrical contact with the stator windings. The operation of this embodiment depends on the fact that an abnormally large torque will be exerted on the stator structure during any short-circuit condition.

  6. Fail safe controllable output improved version of the electromechanical battery

    DOE Patents [OSTI]

    Post, R.F.

    1999-01-19

    Mechanical means are provided to control the voltages induced in the windings of a generator/motor. In one embodiment, a lever is used to withdraw or insert the entire stator windings from the cavity where the rotating field exists. In another embodiment, voltage control and/or switching off of the output is achievable with a variable-coupling generator/motor. A stator is made up of two concentric layers of windings, with a larger number of turns on the inner layer of windings than the outer layer of windings. The windings are to be connected in series electrically, that is, their voltages add vectorially. The mechanical arrangement is such that one or both of the windings can be rotated with respect to the other winding about their common central axis. Another improved design for the stator assembly of electromechanical batteries provides knife switch contacts that are in electrical contact with the stator windings. The operation of this embodiment depends on the fact that an abnormally large torque will be exerted on the stator structure during any short-circuit condition. 4 figs.

  7. Solid Phase Characterization of Solids Recovered from Failed Sluicer Arm

    SciTech Connect (OSTI)

    Cooke, Gary A.

    2015-03-09

    The Enclosure to this memo discusses the solid phase characterization of a solid sample that was retrieved from the single-shell Tank 241-C-111 extended reach sluicer #2. This sluicer, removed from riser #3 on September 25, 2014, was found to have approximately 0.4 gallons of solid tank waste adhering to the nozzle area.

  8. FACT SHEET ON THE CONSEQUENCES OF A FAILED DRUG TEST

    Office of Environmental Management (EM)

    FACT SHEET ON THE CONSEQUENCES OF A POSITIVE DRUG TEST The Secretary has determined that applicants for, and holders of, a DOE "Q" or "L" access authorization (security clearance) will be in Testing Designated Positions (TDP) as specified in DOE Order 3792.3, Drug-Free Federal Workplace Testing Implementation Program, for federal employees, and Title 10 Code of Federal Regulations, Part 707, Workplace Substance Abuse Programs at DOE Sites, for contractor employees.

  9. Investigation of magnetic spin glass property in La{sub 0.5}Bi{sub 0.5}MnO{sub 3} sample using non-linear AC susceptibility measurements

    SciTech Connect (OSTI)

    Kumar, Punith V. Manju, M. R. Dayal, Vijaylakshmi

    2014-04-24

    We present a comprehensive study on origin of Spin Glass (SG) property in polycrystalline La{sub 0.5}Bi{sub 0.5}MnO{sub 3} perovskite oxide using linear and higher order ac susceptibility (?) measurements. The third order harmonic susceptibility (?{sub 3}) vs. temperature (K) with varying magnetic fields from 0.95 to 9.45 Oe and the divergence in their ?{sub 3} (max) allows us to infer the SG behavior occurring in the sample possibly due to co-operative freezing of the spins.

  10. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    Air Conditioning Tables (Million U.S. Households; 24 pages, 138 kb) Contents Pages HC4-1a. Air Conditioning by Climate Zone, Million U.S. Households, 2001 2 HC4-2a. Air Conditioning by Year of Construction, Million U.S. Households, 2001 2 HC4-3a. Air Conditioning by Household Income, Million U.S. Households, 2001 2 HC4-4a. Air Conditioning by Type of Housing Unit, Million U.S. Households, 2001 2 HC4-5a. Air Conditioning by Type of Owner-Occupied Housing Unit, Million U.S. Households, 2001 2

  11. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    0a. Air Conditioning by Midwest Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. Midwest Census Region RSE Row Factors Total Census Division East North Central West North Central 0.5 1.0 1.2 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 20.5 13.6 6.8 2.2 Air Conditioners Not Used ........................... 2.1 0.3 Q Q 27.5 Households Using Electric Air-Conditioning 1

  12. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    1a. Air Conditioning by South Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. South Census Region RSE Row Factors Total Census Division South Atlantic East South Central West South Central 0.5 0.8 1.2 1.3 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 37.2 19.3 6.4 11.5 1.5 Air Conditioners Not Used ........................... 2.1 0.4 Q Q Q 28.2 Households Using Electric Air-Conditioning 1

  13. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    2a. Air Conditioning by West Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. West Census Region RSE Row Factors Total Census Division Mountain Pacific 0.4 1.2 1.7 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 10.7 3.4 7.2 7.1 Air Conditioners Not Used ........................... 2.1 1.1 0.2 0.9 15.5 Households Using Electric Air-Conditioning 1 ........................................ 80.8 9.6 3.2

  14. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    a. Air Conditioning by Climate Zone, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Climate Zone 1 RSE Row Factors Fewer than 2,000 CDD and -- 2,000 CDD or More and Fewer than 4,000 HDD More than 7,000 HDD 5,500 to 7,000 HDD 4,000 to 5,499 HDD Fewer than 4,000 HDD 0.4 2.1 1.0 0.9 1.5 1.0 Total Households With Air-Conditioning ........................... 82.9 5.4 20.9 20.2 14.2 22.1 8.1 Air Conditioners Not Used ............ 2.1 Q 0.4 0.3 0.8 0.4 23.2

  15. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    2a. Air Conditioning by Year of Construction, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Year of Construction RSE Row Factors 1990 to 2001 1 1980 to 1989 1970 to 1979 1960 to 1969 1950 to 1959 1949 or Before 0.4 1.6 1.2 1.1 1.2 1.1 0.9 Households With Electric Air-Conditioning Equipment ........ 82.9 13.6 16.0 14.7 10.4 10.5 17.6 4.7 Air Conditioners Not Used ............ 2.1 Q 0.3 0.5 0.3 0.4 0.5 27.2 Households Using Electric Air-Conditioning 2

  16. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    4a. Air Conditioning by Type of Housing Unit, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Type of Housing Unit RSE Row Factors Single-Family Apartments in Buildings With Mobile Home Two to Four Units Five or More Units 0.4 0.6 1.5 1.4 1.8 Households With Electric Air-Conditioning Equipment ........ 82.9 58.7 6.5 12.4 5.3 4.9 Air Conditioners Not Used ............ 2.1 1.1 Q 0.6 Q 21.8 Households Using Electric Air-Conditioning 1

  17. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    5a. Air Conditioning by Type of Owner-Occupied Housing Unit, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Owner- Occupied Units Type of Owner-Occupied Housing Unit RSE Row Factors Single-Family Apartments in Buildings With Mobile Home Two to Four Units Five or More Units 0.5 0.5 1.5 1.4 1.8 Households With Electric Air-Conditioning Equipment ........ 59.5 58.7 6.5 12.4 5.3 5.2 Air Conditioners Not Used ............ 1.2 1.1 Q 0.6 Q 23.3 Households Using

  18. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    6a. Air Conditioning by Type of Rented Housing Unit, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Rented Units Type of Rented Housing Unit RSE Row Factors Single-Family Apartments in Buildings With Mobile Home Two to Four Units Five or More Units 0.8 0.5 1.4 1.2 1.6 Households With Electric Air-Conditioning Equipment ........ 23.4 58.7 6.5 12.4 5.3 6.1 Air Conditioners Not Used ............ 0.9 1.1 Q 0.6 Q 23.0 Households Using Electric Air-Conditioning

  19. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. Four Most Populated States RSE Row Factors New York California Texas Florida 0.4 1.1 1.7 1.2 1.2 Households With Electric Air-Conditioning Equipment ...................... 82.9 4.9 6.0 7.4 6.2 2.4 Air Conditioners Not Used ........................... 2.1 0.1 0.8 Q 0.1 23.2 Households Using Electric Air-Conditioning 1 ........................................ 80.8 4.7 5.2 7.4 6.1 2.6 Type of Electric Air-Conditioning Used Central

  20. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    8a. Air Conditioning by Urban/Rural Location, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total Urban/Rural Location 1 RSE Row Factors City Town Suburbs Rural 0.5 0.8 1.4 1.3 1.4 Households With Electric Air-Conditioning Equipment ...................... 82.9 36.8 13.6 18.9 13.6 4.3 Air Conditioners Not Used ........................... 2.1 1.2 0.2 0.4 0.3 21.4 Households Using Electric Air-Conditioning 2 ........................................ 80.8 35.6 13.4

  1. ac_household2001.pdf

    Gasoline and Diesel Fuel Update (EIA)

    9a. Air Conditioning by Northeast Census Region, Million U.S. Households, 2001 Air Conditioning Characteristics RSE Column Factor: Total U.S. Northeast Census Region RSE Row Factors Total Census Division Middle Atlantic New England 0.5 1.0 1.2 1.8 Households With Electric Air-Conditioning Equipment ...................... 82.9 14.5 11.3 3.2 3.3 Air Conditioners Not Used ........................... 2.1 0.3 0.3 Q 28.3 Households Using Electric Air-Conditioning 1

  2. Low frequency ac waveform generator

    DOE Patents [OSTI]

    Bilharz, O.W.

    1983-11-22

    Low frequency sine, cosine, triangle and square waves are synthesized in circuitry which allows variation in the waveform amplitude and frequency while exhibiting good stability and without requiring significant stablization time. A triangle waveform is formed by a ramped integration process controlled by a saturation amplifier circuit which produces the necessary hysteresis for the triangle waveform. The output of the saturation circuit is tapped to produce the square waveform. The sine waveform is synthesized by taking the absolute value of the triangular waveform, raising this absolute value to a predetermined power, multiplying the raised absolute value of the triangle wave with the triangle wave itself and properly scaling the resultant waveform and subtracting it from the triangular waveform to a predetermined power and adding the squared waveform raised to the predetermined power with a DC reference and subtracting the squared waveform therefrom, with all waveforms properly scaled. The resultant waveform is then multiplied with a square wave in order to correct the polarity and produce the resultant cosine waveform.

  3. Low frequency AC waveform generator

    DOE Patents [OSTI]

    Bilharz, Oscar W. (Scotia, NY)

    1986-01-01

    Low frequency sine, cosine, triangle and square waves are synthesized in circuitry which allows variation in the waveform amplitude and frequency while exhibiting good stability and without requiring significant stabilization time. A triangle waveform is formed by a ramped integration process controlled by a saturation amplifier circuit which produces the necessary hysteresis for the triangle waveform. The output of the saturation circuit is tapped to produce the square waveform. The sine waveform is synthesized by taking the absolute value of the triangular waveform, raising this absolute value to a predetermined power, multiplying the raised absolute value of the triangle wave with the triangle wave itself and properly scaling the resultant waveform and subtracting it from the triangular waveform itself. The cosine is synthesized by squaring the triangular waveform, raising the triangular waveform to a predetermined power and adding the squared waveform raised to the predetermined power with a DC reference and subtracting the squared waveform therefrom, with all waveforms properly scaled. The resultant waveform is then multiplied with a square wave in order to correct the polarity and produce the resultant cosine waveform.

  4. ac_household2001.pdf

    U.S. Energy Information Administration (EIA) Indexed Site

    RSE Column Factor: Total 2001 Household Income Below Poverty Line Eli- gible for Fed- eral ... RSE Column Factor: Total 2001 Household Income Below Poverty Line Eli- gible for Fed- eral ...

  5. 189,"Alabama Electric Coop Inc",1,"Lowman","Chatom",100,19.94,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",500

    U.S. Energy Information Administration (EIA) Indexed Site

    189,"Alabama Electric Coop Inc",1,"Lowman","Chatom",100,19.94,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",500 189,"Alabama Electric Coop Inc",2,"Chatom","Waynesboro",42.7,32.11,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",469 189,"Alabama Electric Coop

  6. 189,"Alabama Electric Coop Inc",1,"Lowman","Chatom",100,19.94,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",500

    U.S. Energy Information Administration (EIA) Indexed Site

    189,"Alabama Electric Coop Inc",1,"Lowman","Chatom",100,19.94,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",500 189,"Alabama Electric Coop Inc",2,"Chatom","Waynesboro",42.7,32.11,"OH","AC",230,230,1351.5,"ACSR","Single",1,1,"Wooden H-Frame",469 189,"Alabama Electric Coop

  7. Property:NEPA Proposed Action | Open Energy Information

    Open Energy Info (EERE)

    line (Alternative D) or two parallel lines (Alternative E) running 63 miles from the Red Substation near Killdeer to the new White Substation and on to the Blue Substation and...

  8. Antelope Valley Neset | Open Energy Information

    Open Energy Info (EERE)

    line (Alternative D) or two parallel lines (Alternative E) running 63 miles from the Red Substation near Killdeer to the new White Substation and on to the Blue Substation and...

  9. EIS-0451: Notice of Intent to Prepare an Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    transmission line and a 138115-kV substation (collectively referred to as the Hooper Springs Project). The new BPA substation would be called Hooper Springs Substation and would...

  10. Type B Accident Investigation Board Report of the January 20, 1998, Electrical Accident at the Casa Grande Substation,South of Phoenix, Arizona

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Type-B Accident Investigation Board appointed by Michael S.Cowan, Chief Program Officer, Western Area Power Administration.

  11. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  12. Entergy Services, Inc. Smart Grid Project | Open Energy Information

    Open Energy Info (EERE)

    tools.3 Equipment 41 Phasor Measurement Units across 21 Substations 21 Substation Computers Targeted Benefits AngleFrequency Monitoring Post-Mortem Analysis Voltage Stability...

  13. EIS-0183: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission ...

  14. EIS-0183: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gilliam County, Oregon, and has requested interconnection to the FCRTS at BPA's Jones Canyon Substation in Gilliam County, Oregon. BPA will expand this existing substation and...

  15. Microsoft Word - Document1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    substation. The next planned outage on xxxxx high voltage circuit between Palmers Corner Substation and the Potomac River Generating Station is scheduled for Sunday, June 3,...

  16. CX-012212: Categorical Exclusion Determination | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and ACDC panel at Doniphan substation. The project will entail laying an underground cable within the substation. PDF icon CX-012212.pdf More Documents & Publications CX-010405:...

  17. State Historic Preservation Office Concurrence Letter

    Broader source: Energy.gov [DOE]

    Abengoa Mojave Solar Project and Lockhart Substation Connection and Communication Facilities Upgrade, San Bernardino County, California

  18. EIS-0354: Record of Decision

    Broader source: Energy.gov [DOE]

    Western Area Power Administration Valley Electric Association Interconnection of Ivanpah Energy Center to Mead Substation

  19. EA-2013: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona)

  20. EA-2013: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    Herbicide Application at Three Substations; Imperial County (California), Maricopa and Yuma Counties (Arizona)

  1. EA-1110: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    Use of Herbicide for Vegetation Control at VHF Stations, Microwave Stations, Electrical Substations, and Pole Yards

  2. EIS-0400: EPA Notice of Availability of Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

  3. EIS-0400: EPA Notice of Availability of a Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Grandby Pumping Plant Switchyard Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

  4. A/C Model Development and Validation

    Broader source: Energy.gov [DOE]

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  5. Template for Electronic Submission to ACS Journals

    Office of Scientific and Technical Information (OSTI)

    ... Bowers M. T. Ed., Academic Press, New York, N. Y. 1979, vol 2, p 87. (43) a) Thompson, M. ... Chem. 1982, 33, 493. Blanksby, S. J.; Ellison, G. B. Acc. Chem. Res. 2003, 36, 255. (44). ...

  6. A9R72AC.tmp

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

  7. Princeton Plasma Physics Lab - AC power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    p>

    For tips on protecting the cathode, GE has been studying PPPL's use of liquid lithium to prevent damage to the divertor that exhausts heat in fusion facilities. The...

  8. Template for Electronic Submission to ACS Journals

    Office of Scientific and Technical Information (OSTI)

    ... This fits well with the observations described in Fig. 3 and 4. We further explore the ... Trapping in Ultrathin Hafnium Oxide. IEEE Electron Device Lett. 2002, 23, 597-599. ...

  9. DE-AC27- IORVI15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IORVI15051 Modification MO 13 Page 2 of 2 A. The purpose of this modification is to revise Section C, Estimated American Recovery and Reinvestment Act (ARRA) (Modification AOO 1) project nomenclature. This modification makes the following change: From: ESTI.MA TED ARRA WORK TO BE PERFORMED The following estimated work shall be Performed in accordance with the rules and regulations under the American Recovery and Reinvestment Act of 2 009, Pub. L. 1115 (Recovery Act). TOTAL ESTIMTED ARRA PROJECTS

  10. Reduced AC losses in HTS coated conductors

    DOE Patents [OSTI]

    Ashworth, Stephen P.

    2004-10-05

    Methods for reducing hysteresis losses in superconductor coated ribbons where a flux distribution is set into the superconductor coated ribbon prior to the application of alternating current.

  11. Electrolux Gibson Air Conditioner and Equator Clothes Washer Fail DOE Energy Star Testing

    Broader source: Energy.gov [DOE]

    DOE testing in support of the ENERGY STAR program has revealed that an Electrolux Gibson air conditioner (model GAH105Q2T1) and an Equator clothes washer (model EZ 3720 CEE), both of which claimed...

  12. A STUDY OF A FAILED CORONAL MASS EJECTION CORE ASSOCIATED WITH AN ASYMMETRIC FILAMENT ERUPTION

    SciTech Connect (OSTI)

    Joshi, Navin Chandra; Srivastava, Abhishek K.; Uddin, Wahab; Kayshap, Pradeep; Filippov, Boris; Chandra, Ramesh E-mail: njoshi98@gmail.com

    2013-07-01

    We present multi-wavelength observations of an asymmetric filament eruption and associated coronal mass ejection (CME) and coronal downflows on 2012 June 17 and 18 from 20:00-05:00 UT. We use SDO/AIA and STEREO-B/SECCHI observations to understand the filament eruption scenario and its kinematics, while LASCO C2 observations are analyzed to study the kinematics of the CME and associated downflows. SDO/AIA limb observations show that the filament exhibits a whipping-like asymmetric eruption. STEREO/EUVI disk observations reveal a two-ribbon flare underneath the southeastern part of the filament that most probably occurred due to reconnection processes in the coronal magnetic field in the wake of the filament eruption. The whipping-like filament eruption later produces a slow CME in which the leading edge and the core propagate, with an average speed of Almost-Equal-To 540 km s{sup -1} and Almost-Equal-To 126 km s{sup -1}, respectively, as observed by the LASCO C2 coronagraph. The CME core formed by the eruptive flux rope shows outer coronal downflows with an average speed of Almost-Equal-To 56 km s{sup -1} after reaching Almost-Equal-To 4.33 R{sub Sun }. Initially, the core decelerates at Almost-Equal-To 48 m s{sup -2}. The plasma first decelerates gradually up to a height of Almost-Equal-To 4.33 R{sub Sun} and then starts accelerating downward. We suggest a self-consistent model of a magnetic flux rope representing the magnetic structure of the CME core formed by an eruptive filament. This rope loses its previous stable equilibrium when it reaches a critical height. With some reasonable parameters, and inherent physical conditions, the model describes the non-radial ascending motion of the flux rope in the corona, its stopping at some height, and thereafter its downward motion. These results are in good agreement with observations.

  13. Method for use of hydraulically or electrically controlled solenoids under failed on conditions

    DOE Patents [OSTI]

    Bolenbaugh, Jonathan M.; Naqi, Syed

    2014-07-08

    A method to operate a clutch device in an electro-mechanical transmission mechanically-operatively coupled to an internal combustion engine and at least one electric machine includes, in response to a failure condition detected within a flow control device configured to facilitate flow of hydraulic fluid for operating the clutch device, selectively preventing the flow of hydraulic fluid from entering the flow control device and feeding the clutch device. Synchronization of the clutch device is initiated when the clutch device is intended for activation, and only if the clutch device is synchronized, the flow of hydraulic fluid is selectively permitted to enter the flow control device to activate the clutch device.

  14. Methods, systems and apparatus for synchronous current regulation of a five-phase machine

    DOE Patents [OSTI]

    Gallegos-Lopez, Gabriel; Perisic, Milun

    2012-10-09

    Methods, systems and apparatus are provided for controlling operation of and regulating current provided to a five-phase machine when one or more phases has experienced a fault or has failed. In one implementation, the disclosed embodiments can be used to synchronously regulate current in a vector controlled motor drive system that includes a five-phase AC machine, a five-phase inverter module coupled to the five-phase AC machine, and a synchronous current regulator.

  15. 807,"Arkansas Electric Corp",11,"Fitzhugh","OG&E North",100,0.67,"OH","AC",69,161,954,"ACSR","Other",1,1,"Wooden H-Frane",300,1100,86600,46000,90000,223700,"application/vnd.ms-excel"

    U.S. Energy Information Administration (EIA) Indexed Site

    ,"LAND_LAND RIGHT_COSTS(DOLLARS)","POLE_TOWER_FIXTURE_COSTS(DOLLARS)","CONDUCTOR_DEVICE_COSTS(DOLLARS)","CONSTRUCTION_OTHER_COSTS(DOLLARS)","TOTAL_LINE_COST(DOLLARS)","IN_SERVICE_DATE" 807,"Arkansas Electric Corp",11,"Fitzhugh","OG&E North",100,0.67,"OH","AC",69,161,954,"ACSR","Other",1,1,"Wooden

  16. Volume_III_App_A_Figures_Chapter4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10 20 30 40 Miles Z O N E A Z O N E B Z O N E C ZONE D Z O N E E ZONE F Z O N E G Z O N E H ZONE I ZONE J ZON E K Z O N E L Oklahoma AC Interconnection Siting Area Future Optima Substation SE 2 S W 1 W 1 NE 2 E 1 NE 1 S W 2 E 2 SE 1 E 3 SE 3 NW 1 NW 2 Oklahoma Converter Station Siting Area REGION 1 APR LINK 3 REGION 1 APR LINK 1 REGION 1 APR LINK 5 REGION 1 APR LINK 4 REGION 1 APR LINK 2 CO LO RA DO KA NS AS CO LO RA DO OK LA HO MA KAN SAS OKL AHO MA OK LAH OM A TEX AS 83 54 287 TEXAS 15 TEXAS

  17. Evaluation of station blackout accidents at nuclear power plants: Technical findings related to unresolved safety issue A-44: Final report

    SciTech Connect (OSTI)

    Not Available

    1988-06-01

    ''Station Blackout,'' which is the complete loss of alternating current (AC) electrical power in a nuclear power plant, has been designated as Unresolved Safety Issue A-44. Because many safety systems required for reactor core decay heat removal and containment heat removal depend on AC power, the consequences of a station blackout could be severe. This report documents the findings of technical studies performed as part of the program to resolve this issue. The important factors analyzed include: the fequency of loss of offsite power; the probability that emergency or onsite AC power supplies would be unavailable; the capability and reliability of decay heat removal systems independent of AC power; and the likelihood that offsite power would be restored before systems that cannot operate for extended periods without AC power fail, thus resulting in core damage. This report also addresses effects of different designs, locations, and operational features on the estimated frequency of core damage resulting from station blackout events.

  18. EA-1739: Finding of No Significant Impact | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    (Figure 1-1). This 46-mile, 115-kilovolt1 (kV) transmission line, located between the BPA Bandon Substation and the BPA Rogue Substation in Coos and Curry counties, is old,...

  19. CX-006289: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Willow Creek Substation -Transformer Replacement and Substation ModificationsCX(s) Applied: B4.6Date: 07/26/2011Location(s): Grand County, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region

  20. EIS-0443: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada northward to the proposed Thirtymile Substation near...

  1. CX-002213: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Spacer replacement along the Hanford-Wautoma #1 and #2 (substation to substation) transmission linesCX(s) Applied: B1.3Date: 04/23/2010Location(s): Benton County, WashingtonOffice(s): Bonneville Power Administration

  2. CAB Investment Review Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Substation - Additional 500kV Transformer This project will install a new transformer comprised of three single phase 476 MVA transformers at McNary Substation. The project also...

  3. CX-001382: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Installation of a 138 Kilovolt Substation at Building 202 and Modification of Substation 549ACX(s) Applied: B4.11Date: 04/05/2010Location(s): IllinoisOffice(s): Science, Argonne Site Office

  4. Technical Information Exchange on Pyrolysis Oil: Potential for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Renewab;e Heating Oil Substation Fuel in New England Technical Information Exchange on Pyrolysis Oil: Potential for a Renewab;e Heating Oil Substation Fuel in New England This ...

  5. Energy Smart Reserved Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News & Events Skip navigation links Residential Commercial Industrial Federal Agriculture Hydroelectric facilities, transmission substations, as well as some fish hatcheries...

  6. Pike Electric Corporation | Open Energy Information

    Open Energy Info (EERE)

    27030 Sector: Renewable Energy Product: Pike provides engineering, construction and maintenance for distribution and transmission powerlines, substations, Engineering, Procurement...

  7. THURSDAY: Deputy Secretary of Energy to Visit Western Area Power

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administration Transmission Substation | Department of Energy THURSDAY: Deputy Secretary of Energy to Visit Western Area Power Administration Transmission Substation THURSDAY: Deputy Secretary of Energy to Visit Western Area Power Administration Transmission Substation February 10, 2015 - 1:00pm Addthis News Media Contact 202 586 4940 DOENews@hq.doe.gov THURSDAY: Deputy Secretary of Energy to Visit Western Area Power Administration Transmission Substation WASHINGTON - Deputy Secretary of

  8. EIS-0323-S1: Sacramento Area Voltage Support Project Supplemental Environmental Impact Statement and Environmental Impact Report, Placer, Sacramento, and Sutter Counties, California

    Broader source: Energy.gov [DOE]

    Construction and operation has been proposed of approximately 31 to 38 miles of new, double-circuit, 230-kilovolt (kV) transmission line between Western's O'Banion Substation and the area just south of SMUD's Elverta Substation and the reconstruciton of SMUD's existing 230-kV/115kV transmission line between SMUD's Elverta and Natomas substations.

  9. DE-AC05-00OR22800

    National Nuclear Security Administration (NNSA)

    ... NAP 70.2 07022010 PHYSICAL PROTECTION NAP 70.4 07022010 INFORMATION SECURITY OMB-Circular A-123 12212004 MANAGEMENT'S RESPONSIBILITY FOR INTERNAL CONTROL OPS-323 10212004 ...

  10. WRPS ATL DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Planning and Management DOE M 470.4-1, Chg 1 DOE M 470.4-2A, CRD DOE M 470.4-2A, Physical Protection DOE M 470.4-2A, DOE M 470.4-3 Protective Force DOE M 470.4-3 DOE M 470.4-4A ...

  11. Contract DE-AC05-00OR22800

    National Nuclear Security Administration (NNSA)

    ... NAP 70.2 07022010 PHYSICAL PROTECTION NAP 70.4 07022010 INFORMATION SECURITY OMB-Circular A-123 12212004 MANAGEMENT'S RESPONSIBILITY FOR INTERNAL CONTROL OPS-323 10212004 ...

  12. Contract No. DE-AC02-07CH11358

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... the reception and display of audiovisual signals received from terrestrial, cable, ... sources of energy, develop effective machinery to monitor environmental effects of ...

  13. Graphene-coated coupling coil for AC resistance reduction

    DOE Patents [OSTI]

    Miller, John M

    2014-03-04

    At least one graphene layer is formed to laterally surround a tube so that the basal plane of each graphene layer is tangential to the local surface of the tube on which the graphene layer is formed. An electrically conductive path is provided around the tube for providing high conductivity electrical path provided by the basal plane of each graphene layer. The high conductivity path can be employed for high frequency applications such as coupling coils for wireless power transmission to overcome skin depth effects and proximity effects prevalent in high frequency alternating current paths.

  14. SF 6110-AC Residual Inventory of Material or Equipment Furnished...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Specification No. and whether item is Classified, Furnished, Acquired, Esplosive, Toxic, Raw Mat'l, Good Part, or Scrap. The above listing is a COMPLETE inventory of residual...

  15. Contract DE-AC06-08RL14788

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects and Construction M. N. Jaraysi Vice President for Environmental Program and Strategic Planning CHPRC Monthly Performance Report December 2011 D1 CHPRC-2011-12, Rev. 0...

  16. Contract DE-AC06-08RL14788

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    were completed. Initial review of the conceptual design began in November. Continued sediment load-out of 183.2KE Basin. Continued with erecting, scaffolding and demolition...

  17. Demodulation circuit for AC motor current spectral analysis

    DOE Patents [OSTI]

    Hendrix, Donald E. (Oak Ridge, TN); Smith, Stephen F. (Knoxville, TN)

    1990-12-18

    A motor current analysis method for the remote, noninvasive inspection of electric motor-operated systems. Synchronous amplitude demodulation and phase demodulation circuits are used singly and in combination along with a frequency analyzer to produce improved spectral analysis of load-induced frequencies present in the electric current flowing in a motor-driven system.

  18. Quenching of the initial ac Susceptibility in Single Domain Ni...

    Office of Scientific and Technical Information (OSTI)

    allowing an unambiguous determination of the magnetic state of the nanostructure and a clean separation of different contributions to its dynamic properties. For example, an...

  19. "Permanent Magnet Generator-like AC Current Drive for Torroidal...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fusion Devices" Inventor..--.. Ali Zolfaghari The scheme is similar to a permanent magnet generator. Large strong permanent magnets placed toroidally on the outside of a torus are...

  20. CenterPoint Energy A/C Distributor Program

    Broader source: Energy.gov [DOE]

    Note:  This incentive is only available to customers within CenterPoint Energy’s electric service territory (greater Houston area, Texas)

  1. Superconductor films with improved flux pinning and reduced AC losses

    DOE Patents [OSTI]

    Goyal, Amit (Knoxville, TN)

    2011-04-05

    The present invention relates to a method for producing a defect-containing superconducting film, the method comprising (a) depositing a phase-separable layer epitaxially onto a biaxially-textured substrate, wherein the phase-separable layer includes at least two phase-separable components; (b) achieving nanoscale phase separation of the phase-separable layer such that a phase-separated layer including at least two phase-separated components is produced; and (c) depositing a superconducting film epitaxially onto said phase-separated components of the phase-separated layer such that nanoscale features of the phase-separated layer are propagated into the superconducting film.

  2. Motion characteristics of long ac arcs in atmospheric air

    SciTech Connect (OSTI)

    Gu Shanqiang; He Jinliang; Zeng Rong; Zhang Bo; Xu Guozheng; Chen Weijiang

    2007-01-29

    Experiments on the motion of long alternating current arcs in atmospheric air show that the anode and cathode arc roots have different motion characteristics because of different formation mechanisms. During a half cycle of the arc current, the anode arc root moves towards the direction of magnetic force and occasionally has a jumping motion, while the cathode arc root moves sufficiently slow to consider it stationary and hardly has any jump. The arc column has a complex shape and moves under the drive of the magnetic force and is also quickened by the lower arc root.

  3. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    784 See Block 16C 0533 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  4. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Item #3 See Block 16C 0536 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in

  5. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Items 0001 and 0002 041152224 OAK RIDGE ASSOCIATED UNIVERSITIES, INC. 00516 Oak Ridge TN 37831 P.O. Box 2008 ORNL Site Office U.S. Department of Energy 16SC000275 11/24/2015 0548 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date

  6. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Item 0003 041152224 OAK RIDGE ASSOCIATED UNIVERSITIES, INC. 00516 Oak Ridge TN 37831 P.O. Box 2008 ORNL Site Office U.S. Department of Energy 16SC000275 See Block 16C 0549 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified

  7. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16SC000486 Line Item # 1 041152224 OAK RIDGE ASSOCIATED UNIVERSITIES, INC. 00516 Oak Ridge TN 37831 P.O. Box 2008 ORNL Site Office U.S. Department of Energy 16SC000486 Line Item # 1 See Block 16C 0551 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to

  8. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , Line Item 001 See Block 16C 0554 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set

  9. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Line Item 0002 See Block 16C 0555 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set

  10. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 See Block 16C 0557 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  11. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 See Block 16C 0558 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  12. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    041152224 OAK RIDGE ASSOCIATED UNIVERSITIES, INC. 00518 Oak Ridge TN 37831 P.O. Box 2001 U.S. Department of Energy Oak Ridge 00518 Oak Ridge TN 37831 P.O. Box 2001 U.S. Department of Energy Oak Ridge 10SC002592 See Block 16C 129 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt

  13. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    585 See Block 16C 101 6 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  14. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1615 See Block 16C 102 7 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  15. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2153 See Block 16C 105 8 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  16. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10EM000030 See Block 16C 107 5 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in

  17. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    335 See Block 16C 109 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  18. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    534 See Block 16C 110 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  19. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM002050 See Block 16C 115 8 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  20. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Not Applicable ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM003531 See Block 16C 121 20 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  1. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    N/A ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 10EM003731 See Block 16C 122 60 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING

  2. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    169 See Block 16C 126 4 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  3. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    586 11/30/2010 129 4 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  4. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 11EM000721 See Block 16C 130 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  5. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 11EM001026 See Block 16C 133 5 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  6. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reports 6 and 7 ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office See Schedule 04/08/2011 136 8 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  7. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 11EM002952 See Block 16C 141 8 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING

  8. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0/01/2011 145 16 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The

  9. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    03 See Block 16C 146 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  10. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12 See Block 16C 147 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  11. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    181 See Block 16C 148 4 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  12. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Not Applicable ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM000245 11/04/2011 150 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  13. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 12EM000764 See Block 16C 154 5 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  14. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6-04RL14383 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be

  15. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Not Applicable ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 06/28/2012 162 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  16. DE-AC06-04RL14383

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    See Schedule ROCKVILLE MD 208506247 053506312 COMPUTER SCIENCES CORPORATION Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office Richland WA 99352 00601 P.O. Box 550, MSIN A7-80 Richland Operations Office U.S. Department of Energy Richland Operations Office 09EM001402 See Block 16C 098 47 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12.

  17. DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Block 16C 0229 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The

  18. DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this

  19. DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedule See Block 16C 0230 4 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in

  20. DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    01 806500521 WASHINGTON RIVER PROTECTION SOLUTIONS LLC Richland WA 99352 MS: H6-60 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection 10EM003843 See Block 16C 073 4 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If

  1. DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AIKEN SC 298013852 806500521 WASHINGTON RIVER PROTECTION SOLUTIONS LLC Richland WA 99352 MS: H6-60 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection 09EM001555 08/20/2009 023 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  2. DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BOISE ID 837290001 806500521 WASHINGTON RIVER PROTECTION SOLUTIONS LLC Richland WA 99352 MS: H6-60 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection See Schedule 09/14/2009 026 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  3. DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BOISE ID 837290001 806500521 WASHINGTON RIVER PROTECTION SOLUTIONS LLC Richland WA 99352 MS: H6-60 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection 09EM001986 09/17/2009 027 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND

  4. DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1987 09/29/2009 028 4 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  5. DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2187 09/30/2009 029 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  6. DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10EM000009 10/13/2009 031 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in

  7. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    304 See Block 16C 0114 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  8. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    827013467 ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection 13EM000012 See Block 16C 079 4 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is

  9. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date

  10. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    01250 2013 34 421301 25422 1110909 0001481 0000000 0000000 827013467 ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection 13EM000731 See Block 16C 082 5 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM

  11. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    827013467 ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection 13EM001068 See Block 16C 083 6 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is

  12. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    See Schedule 827013467 ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection 11EM000458 See Block 16C 022 1 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If

  13. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    01250 2011 34 421301 25200 1110909 0001481 0000000 0000000 000000 827013467 ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection 11EM000542 12/08/2010 023 1 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN

  14. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    See Schedule 827013467 ADVANCED TECHNOLOGIES AND LABORATORIES (ATL) Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection Richland WA 99352 00603 P.O. Box 450 Office of River Protection U.S. Department of Energy Office of River Protection 11EM000982 01/19/2011 024 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If

  15. Solar Electric Grid Integration - Advanced Concepts (SEGIS-AC...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    are targeting ways to develop power electronics and build smarter, more interactive ... protocols, and that maintain or reduce the costs of power electronics to 0.10 per watt. ...

  16. Contract DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    79 SF30 Continuation Page, Block 14 Page 2 of 7 Purpose of Modification: The purpose of this modification is to do the following: 1 . Definitize the contract Change Order issued in modification 036 to implement the National Fire Protection Associations(NFPA) 70 National Electrical Code (NEC), 2008 revision and NFPA 70E, Standard for Electrical Safety in the Workplace, 2009 revision. The addition of this new requirement increased the costs of CLIN 1 by $3,727,728 and increased fee in the amount

  17. Contract DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    80 Page 2 of 2 SF-30 Continuation Page, Block 14 1. The purpose of this modification is to authorize the Contractor to expend previously obligated Recovery Act funds, which resulted from cost efficiencies on completed Recovery Act funded projects, for performance of base contract work scope. 2. No additional funds are obligated to the contract as a result of this modification. 3. The contractor is authorized to expend Recovery Act funds on the following Base Operations activities. The Contractor

  18. Contract DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    56 SF30 Continuation Page, Block 14 Page 2 of 3 Purpose of Modification: The purpose of this modification is to make certain additions and changes to the contract: 1. In accordance with DEAR 970.5204-2, Laws, Regulations and DOE Directives (DEC 2000) and FAR Clause 52.243-2, Changes-Cost Reimbursement (AUG 1987) the following are updated: a. In Section C, Table C.5-Summary of Contract Deliverables, revise the Deliverable Due Date for Deliverable Number C.2.3.1-2, 'Integrated Waste Feed Delivery

  19. Contract DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    60 SF30 Continuation Page, Block 14 Page 2 of 8 Purpose of Modification: The purpose of this modification is to do the following: 1. Definitize the contract Change Order issued in modification M002 to implement the Office of Environmental Management (EM) Quality Assurance Program: a. In Section J-2, Table J.2.8, Directives, Regulations, Policies and Standards, add the Quality Assurance Program (QAP) (EM-QA-Q0l, Revision 0). b. The addition of this new requirement increased the contract value by

  20. Contract DE-AC27-08RVI14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RVI14800 Modification 087 SF30 Continuation Page, Block 14 Purpose of Modification: The following changes are hereby incorporated into the contract: 1. Update Section B as follows: 1.1 Incorporate costs for Due Diligence Discovery and Investigation Form (DDDIF)-3 )7 for the C-200 Waste Retrieval. The addition of this new scope increases the costs of CLIN 1. Base Operations by $2,5 16,292 and increases fee in the amount of $150,978, for a total increase in contract value of $2,667,270. 1.2

  1. Contract No. DE-AC27-01 RV14136

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RV14136 Modification No. 225 SF-30 Continuation Modification Purpose: The purpose of this modification is to direct BNI to proceed with the Section C, Statement of Work, C.7 Facility Specifications, paragraph c(5) and c(6) revisions. A. BNI shall submit within 60 days of date of this modification a detailed technical and price proposal. B. A bi-lateral modification definitizing this change order shall be executed no later than 180 days after of this modification and receipt of an acceptable

  2. Contract No. DE-AC27-01RV14136

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    344 SF-30 Continuation Page 2 of 6 Modification Purpose: 1. The purpose of this modification is to issue a change order as follows: a. Section C, Statement of Work, is revised to initiate procurement of the Balance of Facilities (BOF) modifications and LAW Valve Vault materials to support Direct Feed of LAW (DFLAW) in the contract and add Interface Control Documents. b. The Contractor is directed to proceed with the workscope in Section C, Statement of Work, Standard 4 Construction, Procurement,

  3. Contract No. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modification No. 48 SF-30 Continuation Purpose of Modification: The purpose of this modification is to exercise Option Period 1, Analytical Services & Testing, under Contract Line Item (CLIN) No. 3 of the contract. As a result of this contractual action, Contract Section B, Supplies or Services and Prices/Costs, is updated to show an extension of the period of performance of the contract. There are currently no fuinds obligated to CLTh No. 3 as a result of this modification. Further, these

  4. Contract No. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    28 SF-30 Continuation Page 2 of 3 14. Description of Amendment/Modification Continued: 1. Section B.1, Type of Contract - Items Being Acquired, is revised to increase the obligated funds for Contract Line Item (CLIN) 11. CLIN 11 is increased by $8,359.81, from $1,000,000.00 to $1,008,359.81. The total obligated funds is changed from $69,824,229.27 to $69,832,589.08. The change is as follows: FROM: TOTAL FUNDS OBLIGATED CLIN Number Description Estimated Cost Funds Obligated 1 Contract Transition

  5. Contract No. DE-AC27-10RV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    17 SF-30 Continuation Page 2 of 3 Purpose of Modification: 1. Update Section H.17(i)(5)(ii), Pension and Other Benefit Programs, replacing "Chamber of Commerce Annual Employee Benefits Cost Survey" with "Department of Labor's Bureau of Labor Statistics." The change is as follows: FROM: Separate Employee Benefits Cost Study comparisons are annually required for all plans identified in paragraph (a). An Employee Benefits Cost Study is a study which analyzes the Contractor's

  6. Contract No. DE-AC27-IORV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 SF-30 Continuation Purpose of Modification: The purpose of this modification is to update Section B, Supplies or Services and Prices/Costs. This contract modification provides incremental funding to CLIN 2, Analytical Services& Testing. Description of Modification: 1 . Under the authority of Contract Clause 1.59, Limitation of Funds (Apr 1984), the total amount of funds obligated to CLIN 2, Analytical Services & Testing, is increased by $130,000, from $21,069,375.86 to $21,199,375.86.

  7. Contract No. DE-AC27-IORV15051

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 SF-30 Continuation Purpose of Modification: The purpose of this modification is to update Section B3, Supplies or Services and Prices/Costs. This contract modification provides incremental funding to CLIN 2, Analytical Services & Testing. Description of Modification: 1 . Under the authority of Contract Clause 1.59, Limitation of unds (Apr 1984), the total amount of funds obligated to CLIN 2, Analytical Services & Testing, is increased by $700,000.00, from $21,199,375.86 to

  8. Contract No. DE-AC27-OIRVI4136

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OIRVI4136 Modification No. 248 SF-30 Continuation Purpose of Modification: The purpose of this modification is to obligate incremental funding and update the table in Section B, Supplies or Services and PriceslCosts, Contract Clause B.2, Obligation and Availability of Funds and Contract Value, paragraph (a). Description of Modification: 1 . The total amount of funds obligated to budgetary control point 1111245 is increased by $23,200,000.00 from $723,470,799.00 to $746,670,799.00. 2. The total

  9. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date

  10. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date

  11. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date

  12. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    370 See Block 16C 057 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  13. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    871 See Block 16C 060 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  14. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    951 See Block 16C 061 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  15. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2740 See Block 16C 064 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  16. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    39 See Block 16C 067 4 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  17. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4135 See Block 16C 069 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  18. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6389 08/26/2009 077 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  19. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date

  20. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date

  1. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date

  2. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date

  3. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14. The hour and date

  4. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 See Block 16C 100 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  5. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 See Block 16C 101 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  6. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 See Block 16C 104 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  7. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 See Block 16C 105 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  8. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 See Block 16C 106 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  9. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 See Block 16C 107 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  10. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10SC000720 See Block 16C 108 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in

  11. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A No PR See Block 16C 109 3 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in

  12. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 See Block 16C 110 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  13. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 See Block 16C 111 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  14. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 See Block 16C 112 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  15. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 See Block 16C 113 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  16. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 See Block 16C 114 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  17. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 See Block 16C 115 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.

  18. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    570 See Block 16C 116 2 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  19. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    795 See Block 16C 117 9 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item

  20. DE-AC05-06OR23100

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 See Block 16C 119 9 1 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended. is extended, Items 8 and 15, and returning Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing The above numbered solicitation is amended as set forth in Item 14.