Powered by Deep Web Technologies
Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

ARM - SGP Radiometric Calibration Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

pyrgeometers. The ARM Climate Research Facility requires accurate measurements of solar radiation from radiometers used in ground-based networks and airborne instrument...

2

Suggestions for Radiometric Calibration Coefficient Generation  

Science Conference Proceedings (OSTI)

The great emphasis that studies of global change have placed on accurate absolute radiometric calibration of satellite sensors has led to the development of many new onboard and vicarious calibration techniques. With the launch in 1998 of the ...

Philip N. Slater; Stuart F. Biggar

1996-04-01T23:59:59.000Z

3

Vicarious Radiometric Calibrations of EOS Sensors  

Science Conference Proceedings (OSTI)

Four methods for the in-flight radiometric calibration and cross calibration of multispectral imaging sensors are described. Three make use of ground-based reflectance, irradiance, and radiance measurements in conjunction with atmospheric ...

Phlip N. Slater; Stuart F. Biggar; Kurtis J. Thome; David I. Gellman; Paul R. Spyak

1996-04-01T23:59:59.000Z

4

Visible/infrared radiometric calibration station  

Science Conference Proceedings (OSTI)

We have begun construction of a visible/infrared radiometric calibration station that will allow for absolute calibration of optical and IR remote sensing instruments with clear apertures less than 16 inches in diameter in a vacuum environment. The calibration station broadband sources will be calibrated at the National Institute of Standards and Technology (NIST) and allow for traceable absolute radiometric calibration to within {plus_minus}3% in the visible and near IR (0.4--2.5 {mu}m), and less than {plus_minus}1% in the infrared, up to 12 {mu}m. Capabilities for placing diffraction limited images or for sensor full-field flooding will exist. The facility will also include the calibration of polarization and spectral effects, spatial resolution, field of view performance, and wavefront characterization. The configuration of the vacuum calibration station consists of an off-axis 21 inch, f/3.2, parabolic collimator with a scanning fold flat in collimated space. The sources are placed, via mechanisms to be described, at the focal plane of the off-axis parabola. Vacuum system pressure will be in the 10{sup {minus}6} Torr range. The broadband white-light source is a custom design by LANL with guidance from Labsphere Inc. The continuous operating radiance of the integrating sphere will be from 0.0--0.006 W/cm{sup 2}/Sr/{mu}m (upper level quoted for {approximately}500 nm wavelength). The blackbody source is also custom designed at LANL with guidance from NIST. The blackbody temperature will be controllable between 250--350{degrees}K. Both of the above sources have 4.1 inch apertures with estimated radiometric instability at less than 1%. The designs of each of these units will be described. The monochromator and interferometer light sources are outside the vacuum, but all optical relay and beam shaping optics are enclosed within the vacuum calibration station. These sources are described, as well as the methodology for alignment and characterization.

Byrd, D.A.; Maier, W.B. II; Bender, S.C.; Holland, R.F.; Michaud, F.D.; Luettgen, A.L.; Christensen, R.W. [Los Alamos National Lab., NM (United States); O`Brian, T.R. [National Inst. of Standards and Technology (NML), Gaithersburg, MD (United States). Radiometric Physics Div.

1994-07-01T23:59:59.000Z

5

Modeling of Spectralon diffusers for radiometric calibration in remote sensing  

E-Print Network (OSTI)

Modeling of Spectralon diffusers for radiometric calibration in remote sensing G. Bazalgette Courre Abstract. Onboard calibration of radiometric measurements in remote sensing is often achieved for publication May 28, 2003. 1 Introduction Light diffusers are used in remote sensing applications

Sprik, Rudolf

6

Facilities for Calibration  

Science Conference Proceedings (OSTI)

... Our state-of-the-art property measurements require extensive calibration facilities of equal quality. Regular calibrations are essential for realistic ...

2014-01-03T23:59:59.000Z

7

Calibration Facilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities DOE supports the development, standardization, and maintenance of calibration facilities for environmental radiation sensors. Radiation standards at the facilities are primarily used to calibrate portable surface gamma-ray survey meters and borehole logging instruments used for uranium and other mineral exploration and remedial action measurements. Standards for calibrating borehole fission neutron devices are also available, but are used infrequently. Radiation standards are constructed of concrete with elevated, uniform concentrations of naturally occurring potassium, uranium, and/or thorium. Pad standards have large, flat surfaces suitable for calibration

8

Once is Enough in Radiometric Calibrations  

Science Conference Proceedings (OSTI)

... strategy we consider one of the most popular optical radiation calibration services offered by ... 8. Drive out fear so that all may work effectively for the ...

2010-08-19T23:59:59.000Z

9

Calibration Facilities Documents | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services » Calibration Facilities » Calibration Facilities Services » Calibration Facilities » Calibration Facilities Documents Calibration Facilities Documents October 17, 2013 Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) The first edition of this report, released in October 1982, presented physical-characteristic information for the various DOE radiologic-instrument calibration facilities located throughout the U.S. Three subsequent editions have been released in an effort to update information regarding the current status of the facilities. June 30, 1994 Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (June 1994) Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (June 1994)

10

Radiometric and Geometric Calibration of a Visible Spectral Electro-Optic Fisheye Camera Radiance Distribution System  

Science Conference Proceedings (OSTI)

Camera systems which measure a complete hemispherical field (fisheye lens systems), can be applied to the measurement of the radiance, but accurate radiometric and geometric calibrations are required to obtain absolute radiance data. The ...

Kenneth J. Voss; Giuseppe Zibordi

1989-08-01T23:59:59.000Z

11

LLL calibration and standards facility  

SciTech Connect

The capabilities of Lawrence Livermore Laboratory's Calibration and Standards Facility are delineated. The facility's ability to provide radiation fields and measurements for a variety of radiation safety applications and the available radiation measurement equipment are described. The need for national laboratory calibration labs to maintain traceability to a national standard are discussed as well as the areas where improved standards and standardization techniques are needed.

Campbell, G.W.; Elliott, J.H.

1980-04-15T23:59:59.000Z

12

Investigation of Pre- and Post-Flight Radiometric Calibration Uncertainties from Surface Based Measurements  

Science Conference Proceedings (OSTI)

A new technique has been developed for inferring column ozone amounts and aerosol optical depths from zenith sky observations. A new radiometric calibration technique for large aperture remote sensing instruments observing the earth through space has been validated which subsequently increased the accuracy of remote sensing measurements of ozone and vertical profiles using measurements of back-scattered ultraviolet solar radiation.

Heath, D.F.; Wei, Z.Y.; Ahman, Z.

1997-06-01T23:59:59.000Z

13

A Liquid-Helium-Cooled Absolute Reference Cold Load forLong-Wavelength Radiometric Calibration  

SciTech Connect

We describe a large (78-cm) diameter liquid-helium-cooled black-body absolute reference cold load for the calibration of microwave radiometers. The load provides an absolute calibration near the liquid helium (LHe) boiling point, accurate to better than 30 mK for wavelengths from 2.5 to 25 cm (12-1.2 GHz). The emission (from non-LHe temperature parts of the cold load) and reflection are small and well determined. Total corrections to the LHe boiling point temperature are {le} 50 mK over the operating range. This cold load has been used at several wavelengths at the South Pole and at the White Mountain Research Station. In operation, the average LHe loss rate was {le} 4.4 l/hr. Design considerations, radiometric and thermal performance and operational aspects are discussed. A comparison with other LHe-cooled reference loads including the predecessor of this cold load is given.

Bensadoun, M.; Witebsky, C.; Smoot, George F.; De Amici,Giovanni; Kogut, A.; Levin, S.

1990-05-01T23:59:59.000Z

14

Uncertainty Analysis for Broadband Solar Radiometric Instrumentation Calibrations and Measurements: An Update; Preprint  

DOE Green Energy (OSTI)

The measurement of broadband solar radiation has grown in importance since the advent of solar renewable energy technologies in the 1970's, and the concern about the Earth's radiation balance related to climate change in the 1990's. In parallel, standardized methods of uncertainty analysis and reporting have been developed. Historical and updated uncertainties are based on the current international standardized uncertainty analysis method. Despite the fact that new and sometimes overlooked sources of uncertainty have been identified over the period 1988 to 2004, uncertainty in broadband solar radiometric instrumentation remains at 3% to 5% for pyranometers, and 2% to 3% for pyrheliometers. Improvements in characterizing correction functions for radiometer data may reduce total uncertainty. We analyze the theoretical standardized uncertainty sensitivity coefficients for the instrumentation calibration measurement equation and highlight the single parameter (thermal offset voltages), which contributes the most to the observed calibration responsivities.

Myers, D. R.; Reda, I. M.; Wilcox, S. M.; Stoffel, T. L.

2004-04-01T23:59:59.000Z

15

Providing radiometric traceability for the calibration home base of DLR by PTB  

SciTech Connect

A dedicated calibration technique was applied for the calibration of the spectral radiance transfer standard (RASTA) of the German Aerospace Center (DLR) at the Physikalisch-Technische Bundesanstalt (PTB), consisting of two independent but complementing calibration procedures to provide redundancy and smallest possible calibration uncertainties. Procedure I included two calibration steps: In a first step the optical radiation source of RASTA, an FEL lamp, was calibrated in terms of its spectral irradiance E{sub {lambda}}({lambda}) in the wavelength range from 350 nm to 2400 nm using the PTB Spectral Irradiance Calibration Equipment (SPICE), while in a second step the spectral radiance factor {beta}{sub 0 Degree-Sign :45 Degree-Sign }({lambda}) of the RASTA reflection standard was calibrated in a 0 Degree-Sign :45 Degree-Sign -viewing geometry in the wavelength range from 350 nm to 1700 nm at the robot-based gonioreflectometer facility of PTB. The achieved relative standard uncertainties (k= 1) range from 0.6 % to 3.2 % and 0.1 % to 0.6 % respectively. Procedure II was completely independent from procedure I and allowed to cover the entire spectral range of RASTA from 350 nm to 2500 nm. In the second procedure, the 0 Degree-Sign :45 Degree-Sign -viewing geometry spectral radiance L{sub {lambda},0 Degree-Sign :45 Degree-Sign }({lambda}) of RASTA was directly calibrated at the Spectral Radiance Comparator Facility (SRCF) of PTB. The relative uncertainties for this calibration procedure range from 0.8 % in the visible up to 7.5 % at 2500 nm (k= 1). In the overlapping spectral range of both calibration procedures the calculated spectral radiance L{sub {lambda},0 Degree-Sign :45 Degree-Sign ,calc}({lambda}) from procedure I is in good agreement with the direct measurement of procedure II, i.e. well within the combined expanded uncertainties (k= 2) of both procedures.

Taubert, D. R.; Hollandt, J.; Sperfeld, P.; Pape, S.; Hoepe, A.; Hauer, K.-O. [Physikalisch-Technische Bundesanstalt, Braunschweig und Berlin, 10587 Berlin (Germany); Gege, P.; Schwarzmaier, T.; Lenhard, K.; Baumgartner, A. [Deutsches Zentrum fuer Luft- und Raumfahrt, Institut fuer Methodik der Fernerkundung, 82234 Oberpfaffenhofen (Germany)

2013-05-10T23:59:59.000Z

16

Field Calibration Facilities for Environmental Measurement of Radium,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Calibration Facilities for Environmental Measurement of Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) The first edition of this report, released in October 1982, presented physical-characteristic information for the various DOE radiologic-instrument calibration facilities located throughout the U.S. Three subsequent editions have been released in an effort to update information regarding the current status of the facilities. Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) More Documents & Publications Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (June 1994)

17

NIST SURF Beamline 3: Facility for Irradiance Calibration ...  

Science Conference Proceedings (OSTI)

... Beamline 3 is home to the Facility for Irradiance Calibration Using ... Source of Uncertainty, Nominal Value, Relative Uncertainty, Sensitivity Coefficient, ...

2012-11-19T23:59:59.000Z

18

Calibration of the Improved Stratospheric and Mesospheric Sounder. Part II: Optical Alignment, Spatial, and Pressure Modulator Calibrations  

Science Conference Proceedings (OSTI)

In Part I the Improved Stratospheric and Mesospheric Sounder instrument and its calibration facility were described, and the results of the radiometric and spectral calibrations were presented. In Part II the remaining prelaunch calibrations are ...

C. W. P. Palmer; P. Venters; R. J. Knight; J. Ballard; T. J. Nightingale; P. E. Morris

1997-02-01T23:59:59.000Z

19

Field Calibration Facilities for Environmental Measurement of Radium,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Calibration Facilities for Environmental Measurement of Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) The first edition of this report, released in October 1982, presented physical-characteristic information for the various DOE radiologic-instrument calibration facilities located throughout the U.S. Three subsequent editions have been released in an effort to update information regarding the current status of the facilities. Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) More Documents & Publications Calibration Model Assignments expressed as U3O8, Summary Table ES-1 Field Calibration Facilities for Environmental Measurement of Radium,

20

Appendix D: Facility Process Data and Appendix E: Equipment Calibration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D: Facility Process Data and Appendix E: Equipment D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets Appendix D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets Docket No. EO-05-01: Appendix D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets from Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia Appendix D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Answer of Potomac Electric Power Company and PJM lnterconnection, L.L.C. to the October 6, 2005 motion filed by the Virginia Department of

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Understanding Thermal Drift in Liquid Nitrogen Loads Used for Radiometric Calibration in the Field  

Science Conference Proceedings (OSTI)

An absorbing load in a liquid nitrogen bath is commonly used as a radiance standard for calibrating radiometers operating at microwave to infrared wavelengths. It is generally assumed that the physical temperature of the load is stable and equal ...

Scott N. Paine; David D. Turner; Nils Kchler

22

On-orbit radiometric validation and field-of-view calibration of spaceborne microwave sounding instruments  

E-Print Network (OSTI)

Two calibration/validation efforts planned for current and future spaceborne microwave sounding instruments will be presented. First, the NPOESS Aircraft Sounder Testbed-Microwave (NAST-M) airborne sensor is used to directly ...

Blackwell, William J.

23

Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (June 1994)  

Energy.gov (U.S. Department of Energy (DOE))

Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (June 1994)

24

Calibration Evaluation and Radiometric Testing of Field Radiometers with the SeaWiFS Quality Monitor (SQM)  

Science Conference Proceedings (OSTI)

One of the goals of calibration and validation programs supporting ocean color satellites is to produce water-leaving radiances with an uncertainty of 5% in clear-water regions. This objective requires field instruments with a calibration and ...

Stanford B. Hooker; James Aiken

1998-08-01T23:59:59.000Z

25

SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

26

ARM - SGP Central Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

27

Construction and operation of an improved radiation calibration facility at Brookhaven National Laboratory. Environmental assessment  

Science Conference Proceedings (OSTI)

Calibration of instruments used to detect and measure ionizing radiation has been conducted over the last 20 years at Brookhaven National Laboratory`s (BNL) Radiation Calibration Facility, Building 348. Growth of research facilities, projects in progress, and more stringent Department of Energy (DOE) orders which involve exposure to nuclear radiation have placed substantial burdens on the existing radiation calibration facility. The facility currently does not meet the requirements of DOE Order 5480.4 or American National Standards Institute (ANSI) N323-1978, which establish calibration methods for portable radiation protection instruments used in the detection and measurement of levels of ionizing radiation fields or levels of radioactive surface contaminations. Failure to comply with this standard could mean instrumentation is not being calibrated to necessary levels of sensitivity. The Laboratory has also recently obtained a new neutron source and gamma beam irradiator which can not be made operational at existing facilities because of geometry and shielding inadequacies. These sources are needed to perform routine periodic calibrations of radiation detecting instruments used by scientific and technical personnel and to meet BNL`s substantial increase in demand for radiation monitoring capabilities. To place these new sources into operation, it is proposed to construct an addition to the existing radiation calibration facility that would house all calibration sources and bring BNL calibration activities into compliance with DOE and ANSI standards. The purpose of this assessment is to identify potential significant environmental impacts associated with the construction and operation of an improved radiation calibration facility at BNL.

NONE

1994-10-01T23:59:59.000Z

28

Radiometric Measurements and Data for Evaluating Photovoltaics  

DOE Green Energy (OSTI)

The National Renewable Energy Laboratory (NREL) Photovoltiac Radiometric Measurements Task ddresses the impact of solar and optical radiation on photovoltaic (PV) devices. The task maintains spectral and broadband calibration capability directly traceable to the National Institute of Standards and Technology (NIST) and the World Radiometric Reference (WRR) of the World Meteorological Organization (WMO).

Myers, D. R.; Andreas, A.; Rymes, M.; Stoffel, T.; Reda, I.; Wilcox, S.; Treadwell, J.

2000-01-01T23:59:59.000Z

29

Characterization of the Neutron Fields in the Lawrence Livermore National Laboratory (LLNL) Radiation Calibration Laboratory Low Scatter Calibration Facility  

SciTech Connect

In June 2007, the Department of Energy (DOE) revised its rule on Occupational Radiation Protection, Part 10 CFR 835. A significant aspect of the revision was the adoption of the recommendations outlined in International Commission on Radiological Protection (ICRP) Report 60 (ICRP-60), including new radiation weighting factors for neutrons, updated internal dosimetric models, and dose terms consistent with the newer ICRP recommendations. ICRP-60 uses the quantities defined by the International Commission on Radiation Units and Measurements (ICRU) for personnel and area monitoring including the ambient dose equivalent H*(d). A Joint Task Group of ICRU and ICRP has developed various fluence-to-dose conversion coefficients which are published in ICRP-74 for both protection and operational quantities. In February 2008, Lawrence Livermore National Laboratory (LLNL) replaced its old pneumatic transport neutron irradiation system in the Radiation Calibration Laboratory (RCL) Low Scatter Calibration Facility (B255, Room 183A) with a Hopewell Designs irradiator model N40. The exposure tube for the Hopewell system is located close to, but not in exactly the same position as the exposure tube for the pneumatic system. Additionally, the sources for the Hopewell system are stored in Room 183A where, prior to the change, they were stored in a separate room (Room 183C). The new source configuration and revision of the 10 CFR 835 radiation weighting factors necessitate a re-evaluation of the neutron dose rates in B255 Room 183A. This report deals only with the changes in the operational quantities ambient dose equivalent and ambient dose rate equivalent for neutrons as a result of the implementation of the revised 10 CFR 835. In the report, the terms 'neutron dose' and 'neutron dose rate' will be used for convenience for ambient neutron dose equivalent and ambient neutron dose rate equivalent unless otherwise stated.

Radev, R

2009-09-04T23:59:59.000Z

30

Radiometric instrumentation and measurements guide for photovoltaic performance testing  

DOE Green Energy (OSTI)

The Photovoltaic Module and Systems Performance and Engineering Project at the National Renewable Energy Laboratory performs indoor and outdoor standardization, testing, and monitoring of the performance of a wide range of photovoltaic (PV) energy conversion devices and systems. The PV Radiometric Measurements and Evaluation Team (PVSRME) within that project is responsible for measurement and characterization of natural and artificial optical radiation which stimulates the PV effect. The PV manufacturing and research and development community often approaches project members for technical information and guidance. A great area of interest is radiometric instrumentation, measurement techniques, and data analysis applied to understanding and improving PV cell, module, and system performance. At the Photovoltaic Radiometric Measurements Workshop conducted by the PVSRME team in July 1995, the need to communicate knowledge of solar and optical radiometric measurements and instrumentation, gained as a result of NREL`s long-term experiences, was identified as an activity that would promote improved measurement processes and measurement quality in the PV research and manufacturing community. The purpose of this document is to address the practical and engineering need to understand optical and solar radiometric instrument performance, selection, calibration, installation, and maintenance applicable to indoor and outdoor radiometric measurements for PV calibration, performance, and testing applications. An introductory section addresses radiometric concepts and definitions. Next, concepts essential to spectral radiometric measurements are discussed. Broadband radiometric instrumentation and measurement concepts are then discussed. Each type of measurement serves as an important component of the PV cell, module, and system performance measurement and characterization process.

Myers, D.

1997-04-01T23:59:59.000Z

31

ARM - SGP Geographic Information By Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Geographic Information By Facility Geographic Information By Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Geographic Information By Facility Note: BF = Boundary Facility, EF = Extended Facility, and IF = Intermediate Facility Site Elevation (m) Lat./Long. Surface Type Anthony, Kansas: EF31 412 37.151 N -98.362W Pasture Ashton, Kansas: EF9 386 37.133 N 97.266 W Pasture Beaumont, Kansas: IF1 (Removed 4/12/2011) 478 37.626 N 96.538 W Rangeland Billings, OK (XSAPR Radar): IF4 330 36.579 N 97.364 W Cultivated Field Billings, OK (915 MHz RWP): IF9 291 36.476 N

32

Characteristics of the Neutron Irradiation Facilities of the PSI Calibration Laboratory  

Science Conference Proceedings (OSTI)

The neutron radiation fields of the Calibration Laboratory at Paul Scherrer Institute (PSI) are traceable to the national standards of the Physikalisch-Technische Bundesanstalt (PTB) in Germany. A Berthold LB6411 neutron dose rate meter for neutron radiation is used as a secondary standard. Recently, a thorough characterization of the neutron irradiation fields of the {sup 241}Am-Be and {sup 252}Cf sources by means of reference measurements and a detailed MCNPX simulation of the irradiation facility has been initiated. In this work, the characteristics of the neutron radiation fields are summarized and presented together with model equations and an uncertainty analysis. MCNPX results are shown for the {sup 241}Am-Be source. A comparison of measured and simulated data shows an excellent agreement. From the simulation, valuable information about the neutron fields like the contribution of scattered neutrons in the fields and the energy spectra could be obtained.

Hoedlmoser, H.; Schuler, Ch.; Butterweck, G.; Mayer, S. [Paul Scherrer Institut, 5232 Villigen PSI (Switzerland)

2011-12-13T23:59:59.000Z

33

USE AND CALIBRATION OF A GAS CHROMATOGRAPH FOR GAS ANALYSIS AT THE PROJECT ROVER TEST FACILITY  

DOE Green Energy (OSTI)

A gas-chromatograph system operated by test site personnel was used for over a year to monitor the purity of gases used at the Project Rover test facilities at the Nuclear Rocket Development Station. Information was obtained on the efficiency of gas line purges, total impurities of frozen air in a large liquid hydrogen dewar, and the quality of room inerting systems. Daily monitoring of several block and bleed systems, which prevent hydrogen gas from entering a system through a leaky valve, and periodic monitoring of all gas added to the 10/sup 6/ cubic feet gas storage bottles are required for safe facilities operation. In addition the chromatograph proved useful in special cases for leak detection in vacuum and high pressure systems. The calibration and operation of the chromatograph system using a column of Linde 5A Molecular Sieve for analysis of H/sub 2/, N/sub 2/, land O/sub 2/ is described. Observations of a thermal conductivity reversal in the binary mixture He--H/sub 2/ is presented. (auth)

Liebenberg, D.H.; Edeskuty, F.J.

1963-10-31T23:59:59.000Z

34

Guideline to good practices for control and calibration of measuring and test equipment (M TE) at DOE nuclear facilities  

Science Conference Proceedings (OSTI)

The purpose of the Guideline to Good Practices for Control and Calibration of Measuring and Test Equipment (M TE) at DOE Nuclear Facilities is to provide contractor maintenance organizations with information that may be used for the development and implementation of a rigorously controlled maintenance program directed at controlling and calibrating M TE used for maintenance tasks at DOE nuclear facilities. This document is intended to be an example guideline for the implementation of DOE Order 4330.4A, Maintenance Management Program, Chapter II, Element 11. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they should use the information contained herein as a guide for developing an M TE program applicable to their facility.

Not Available

1993-03-01T23:59:59.000Z

35

Radiometrics | Open Energy Information  

Open Energy Info (EERE)

Radiometrics Radiometrics Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Technique: Radiometrics Details Activities (5) Areas (4) Regions (0) NEPA(0) Exploration Technique Information Exploration Group: Remote Sensing Techniques Exploration Sub Group: Passive Sensors Parent Exploration Technique: Passive Sensors Information Provided by Technique Lithology: Primary use is in mapping potassium alterations Stratigraphic/Structural: Hydrological: Thermal: Cost Information Low-End Estimate (USD): 8.04804 centUSD 0.00804 kUSD 8.04e-6 MUSD 8.04e-9 TUSD / mile Median Estimate (USD): 4,609.55460,955 centUSD 4.61 kUSD 0.00461 MUSD 4.60955e-6 TUSD / mile High-End Estimate (USD): 16,000.001,600,000 centUSD 16 kUSD 0.016 MUSD 1.6e-5 TUSD / mile Time Required Low-End Estimate: 0.05 days1.368925e-4 years

36

Remote Sensing Ayman F. Habib Radiometric Processing of Remote Sensing Data  

E-Print Network (OSTI)

Remote Sensing Ayman F. Habib 1 Chapter 4 Radiometric Processing of Remote Sensing Data #12;Remote. · Noise removal. · Point and edge detection. ­ Frequency domain. #12;Remote Sensing Ayman F. Habib 3 Radiometric Calibration #12;Remote Sensing Ayman F. Habib 4 Recorded Digital Numbers (DN) · Recorded grey

Habib, Ayman

37

Calibration of X-ray detectors in the 8 to 115 keV energy range and their application to diagnostics on the National Ignition Facility  

Science Conference Proceedings (OSTI)

The calibration of X-ray diagnostics is of paramount importance to the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL). National Security Technologies LLC (NSTec) fills this need by providing a wide variety of calibration and diagnostic development services in support of the ongoing research efforts at NIF. The X-ray source in the High Energy X-ray lab utilizes induced fluorescence in a variety of metal foils to produce a beam of characteristic X rays ranging from 8 to 111 keV. Presented are the methods used for calibrating a High Purity Germanium detector, which has been absolutely calibrated using radioactive check sources, compared against a silicon photodiode calibrated at Physikalisch Technische Bundesanstalt (PTB). Also included is a limited presentation of results from the recent calibration of the upgraded Filter Fluorescer X ray Spectrometer.

J. J. Lee, M. J. Haugh, G. LaCaille, and P. Torres

2012-10-01T23:59:59.000Z

38

Energy spectra of the pneumatically positioned neutron sources at LLNL's Hazards control standards and calibration facility  

Science Conference Proceedings (OSTI)

The Hazards Control Department of Lawrence Livermore National Laboratory maintains a Standards and Calibration Laboratory that includes three neutron sources (two /sup 252/Cf and one /sup 238/PuBe that can be positioned pneumatically for irradiations. Ten moderators exist to modify the neutron energy spectra produced by these sources. The thicknesses and materials of these moderators are: 25-cm water; 5-, 10-, 15-, and 25-cm heavy water; 20-cm aluminum; and 2-, 5-, 10-, and 15-cm polyethylene. We used a multisphere spectrometer to measure the neutron spectra at 2 m from both the PuBe source and the smaller Cf source, with the sources bare, and in all of the moderators. These data were reduced in 25 energy groups ranging from 0.25 eV to 16 MeV. Except for the 15-m polyethylene moderator, we also made measurements using a liquid-scintillator fast-neutron spectrometer. These data were reduced in 0.1-MeV increments from 0.5 to 12.5 MeV. Spectra from the measurements and from independent calculations are presented in tabular and graphic form. Dosimetric values, calculated from both the measured and calculated spectra, are also presented.

Thorngate, J.H.

1987-06-15T23:59:59.000Z

39

Definition: Radiometrics | Open Energy Information  

Open Energy Info (EERE)

Radiometrics Radiometrics Jump to: navigation, search Dictionary.png Radiometrics Radiometric (or Airborne Gamma-Ray Spectrometer) Surveys detect and map gamma rays. Gamma rays are natural radioactive emanations from materials in the rocks and soils. All detectable gamma radiation from earth materials come from the natural decay products of either potassium, uranium, or thorium. The gamma ray data are interpreted in combination with other airborne survey data, such as Magnetic Techniques, satellite images and geological and soil maps to map minerals with these radioactive elements, such as magnetite.[1] View on Wikipedia Wikipedia Definition Also Known As Airborne Gamma-Ray Spectrometer Surveying References ↑ Guidelines for Radioelement Mapping Using Gamma Ray Spectrometry

40

radiometric far ultraviolet  

Science Conference Proceedings (OSTI)

... C.; Hill SB; et al., "The NIST EUV facility for advanced photoresist qualification using the witness-sample test," Proceedings of SPIE 7969, 79690K ...

2013-06-17T23:59:59.000Z

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Environment Feature Stories Public Reading Room: Environmental Documents, Reports LANL Home Phonebook Calendar Video About Operational Excellence Facilities Facilities...

42

Correcting Calibrated Infrared Sky Imagery for the Effect of an Infrared Window  

Science Conference Proceedings (OSTI)

A method is demonstrated for deriving a correction for the effects of an infrared window when used to weatherproof a radiometrically calibrated thermal infrared imager. The technique relies on initial calibration of two identical imagers without ...

Paul W. Nugent; Joseph A. Shaw; Nathan J. Pust; Sabino Piazzolla

2009-11-01T23:59:59.000Z

43

Far Ultraviolet Calibration Facility  

Science Conference Proceedings (OSTI)

... The H 2 discharge gives a rich spectrum of molecular lines and molecular ... detector responsivity; filter transmission; uniformity of responsivity. ...

2011-10-03T23:59:59.000Z

44

Preflight and In-Flight Calibration Plan for ASTER  

Science Conference Proceedings (OSTI)

Preflight and in-flight radiometric calibration plans are described for the Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) that is a multispectral optical imager of high spatial resolution. It is designed for the remote ...

A. Ono; F. Sakuma; K. Arai; Y. Yamaguchi; H. Fujisada; P. N. Slater; K. J. Thome; F. D. Palluconi; H. H. Kieffer

1996-04-01T23:59:59.000Z

45

Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Facilities LANL's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Los Alamos National Laboratory (505) 667-5061 Some LANL facilities are available to researchers at other laboratories, universities, and industry. Unique facilities foster experimental science, support LANL's security mission DARHT accelerator DARHT's electron accelerators use large, circular aluminum structures to create magnetic fields that focus and steer a stream of electrons down the length of the accelerator. Tremendous electrical energy is added along the way. When the stream of high-speed electrons exits the accelerator it is

46

The Multi-Channel Infrared Sea Truth Radiometric Calibrator (MISTRC)  

Science Conference Proceedings (OSTI)

A new multichannel infrared sea truth radiometer has been designed and built to improve validation of satellite-determined sea surface temperature. Horizontal grid polarized filters installed on the shortwave channels are very effective in ...

M. J. Suarez; W. J. Emery; G. A. Wick

1997-04-01T23:59:59.000Z

47

DOE/ER-0441 Atmospheric Radiation Measurement Plan - February...  

NLE Websites -- All DOE Office Websites (Extended Search)

43 15 An artist's conception of the radiometric calibration facility at the Solar Energy Research Institute......

48

HYDROCARBON LIQUID FLOW CALIBRATION SERVICE ...  

Science Conference Proceedings (OSTI)

... and is the cross correlation coefficient ... a NIST Hydrocarbon Liquid Flow Calibration Facility ... FED2004-56790, 2004 Heat Transfer/Fluids Engineering ...

2012-05-21T23:59:59.000Z

49

Mercury Geochemical, Groundwater Geochemical, And Radiometric Geophysical  

Open Energy Info (EERE)

Geochemical, Groundwater Geochemical, And Radiometric Geophysical Geochemical, Groundwater Geochemical, And Radiometric Geophysical Signatures At Three Geothermal Prospects In Northern Nevada Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Conference Paper: Mercury Geochemical, Groundwater Geochemical, And Radiometric Geophysical Signatures At Three Geothermal Prospects In Northern Nevada Details Activities (14) Areas (3) Regions (0) Abstract: Ground water sampling, desorbed mercury soil geochemical surveys and a radiometric geophysical survey was conducted in conjunction with geological mapping at three geothermal prospects in northern Nevada. Orientation sample lines from 610 m (2000 ft.) to 4575 m (15,000 ft.) in length were surveyed at right angles to known and suspected faults. Scintillometer readings (gamma radiation - total counts / second) were also

50

Normalization and Calibration of Geostationary Satellite Radiances for the international Satellite Cloud Climatology Project  

Science Conference Proceedings (OSTI)

Procedures are described for normalizing the radiometric calibration of image radiances obtained from the suite of geostationary weather satellites that contributed data to the international Satellite Cloud Climatology Project. The key step is ...

Yves Desormeaux; William B. Rossow; Christopher L. Brest; G. Garrett Campbell

1993-06-01T23:59:59.000Z

51

Laboratory Calibration of the Optical Transient Detector and the Lightning Imaging Sensor  

Science Conference Proceedings (OSTI)

The authors present in detail the laboratory apparatus and techniques that were used to complete a full radiometric calibration of two space-based lightning detectors: the optical transient detector (OTD) and the lightning imaging sensor (LIS) ...

William J. Koshak; Mike F. Stewart; Hugh J. Christian; James W. Bergstrom; John M. Hall; Richard J. Solakiewicz

2000-07-01T23:59:59.000Z

52

UNDERFLIGHT CALIBRATION OF SOHO/CDS AND HINODE/EIS WITH EUNIS-07  

Science Conference Proceedings (OSTI)

Flights of Goddard Space Flight Center's Extreme Ultraviolet Normal Incidence Spectrograph (EUNIS) sounding rocket in 2006 and 2007 provided updated radiometric calibrations for Solar and Heliospheric Observatory/Coronal Diagnostic Spectrometer (SOHO/CDS) and Hinode/Extreme Ultraviolet Imaging Spectrometer (Hinode/EIS). EUNIS carried two independent imaging spectrographs covering wavebands of 300-370 A in first order and 170-205 A in second order. After each flight, end-to-end radiometric calibrations of the rocket payload were carried out in the same facility used for pre-launch calibrations of CDS and EIS. During the 2007 flight, EUNIS, SOHO/CDS, and Hinode/EIS observed the same solar locations, allowing the EUNIS calibrations to be directly applied to both CDS and EIS. The measured CDS NIS 1 line intensities calibrated with the standard (version 4) responsivities with the standard long-term corrections are found to be too low by a factor of 1.5 due to the decrease in responsivity. The EIS calibration update is performed in two ways. One uses the direct calibration transfer of the calibrated EUNIS-07 short wavelength (SW) channel. The other uses the insensitive line pairs, in which one member was observed by the EUNIS-07 long wavelength (LW) channel and the other by EIS in either the LW or SW waveband. Measurements from both methods are in good agreement, and confirm (within the measurement uncertainties) the EIS responsivity measured directly before the instrument's launch. The measurements also suggest that the EIS responsivity decreased by a factor of about 1.2 after the first year of operation (although the size of the measurement uncertainties is comparable to this decrease). The shape of the EIS SW response curve obtained by EUNIS-07 is consistent with the one measured in laboratory prior to launch. The absolute value of the quiet-Sun He II 304 A intensity measured by EUNIS-07 is consistent with the radiance measured by CDS NIS in quiet regions near the disk center and the solar minimum irradiance recently obtained by CDS NIS and the Solar Dynamics Observatory/Extreme Ultraviolet Variability Experiment.

Wang Tongjiang; Brosius, Jeffrey W. [Institute for Astrophysics and Computational Sciences (IACS) in the Department of Physics, Catholic University of America, 620 Michigan Avenue NE, Washington, DC 20064 (United States); Thomas, Roger J.; Rabin, Douglas M.; Davila, Joseph M. [NASA Goddard Space Flight Center, Code 671, Greenbelt, MD 20771 (United States); Young, Peter R. [College of Science, George Mason University, 4400 University Drive, Fairfax, VA 22030 (United States); Del Zanna, Giulio, E-mail: tongjiang.wang@nasa.gov [DAMTP, Centre for Mathematical Sciences, University of Cambridge, Wilberforce Road, Cambridge, CB3 0WA (United Kingdom)

2011-12-01T23:59:59.000Z

53

Dynamic properties of a radiometric monitoring system  

Science Conference Proceedings (OSTI)

On-line radiometric monitors (nuclear meters) have been in use in the industry for many years. They have been utilised for coal quality monitoring, in the control systems for coal blending, or for separating coals in the heavy media separation process. ... Keywords: adaptive monitor, nuclear meter dynamics, stochastic signal, stochastic signal filtration

Stanislaw Cierpisz

2009-07-01T23:59:59.000Z

54

NIST Retroreflection calibration facility (CHARM)  

Science Conference Proceedings (OSTI)

... NIST was awarded a contract by the National Cooperative Highway Research Program (NCHRP Project 05-16) to develop a dedicated reference ...

2012-10-02T23:59:59.000Z

55

Calibration of the Improved Stratospheric and Mesospheric Sounder. Part I: Introduction, Spectral, and Radiometric Calibration  

Science Conference Proceedings (OSTI)

The Improved Stratospheric and Mesospheric Sounder (ISAMS) is an infrared spectroradiometer that formed part of the science instrument payload of the Upper Atmosphere Research Satellite. An essential part of the success of ISAMS in orbit was a ...

J. Ballard; C. W. P. Palmer; P. E. Morris; T. J. Nightingale; J. Firth; R. J. Knight; P. Venters; R. J. Wells; J. G. Whitney

1996-08-01T23:59:59.000Z

56

NIST Measurement Services: NIST Calibration Services for ...  

Science Conference Proceedings (OSTI)

... 1. V. Gowda, TT Yeh, PI Espina, and NP Yende, The New NIST Water Flow Calibration Facility, Proceedings of the 2003 FLOMEKO (Groningen ...

2013-06-05T23:59:59.000Z

57

Radiometrics At Silver Peak Area (Henkle, Et Al., 2005) | Open...  

Open Energy Info (EERE)

References William R. Henkle Jr., Wayne C. Gundersen, Thomas D. Gundersen (2005) Mercury Geochemical, Groundwater Geochemical, And Radiometric Geophysical Signatures At Three...

58

Radiometrics At Reese River Area (Henkle, Et Al., 2005) | Open...  

Open Energy Info (EERE)

References William R. Henkle Jr., Wayne C. Gundersen, Thomas D. Gundersen (2005) Mercury Geochemical, Groundwater Geochemical, And Radiometric Geophysical Signatures At Three...

59

Posters Ground-Based Radiometric Observations  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 Posters Ground-Based Radiometric Observations of Atmospheric Water for Climate Research J. B. Snider, D. A. Hazen, A. J. Francavilla, W. B. Madsen, and M. D. Jacobson National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado Introduction Surface-based microwave and infrared radiometers have been employed by the National Oceanic and Atmospheric Administration's Environmental Technology Laboratory (NOAA/ETL) in climate research since 1987. The ability of these systems to operate continuously and unattended for extended periods of time has provided significant new information on atmospheric water vapor and cloud liquid. These data are being employed to improve our understanding of cloud-radiation feedback mechanisms, an understanding

60

Calibration Highlights  

Science Conference Proceedings (OSTI)

... In Natural Gas Pipelines. A Primary Voltage Standard for the Whole World. A Primary Voltage Standard. ... Large Mass Calibrations -- A Matter Scale. ...

2013-08-21T23:59:59.000Z

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

New Facility Will Test Disposal Cell Cover Renovation | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Services Ecosystem Management Team New Facility Will Test Disposal Cell Cover Renovation New Facility Will Test Disposal Cell Cover Renovation Calibration Facilities...

62

Radiometrics At Fort Bliss Area (DOE GTP) | Open Energy Information  

Open Energy Info (EERE)

Radiometrics At Fort Bliss Area (DOE GTP) Radiometrics At Fort Bliss Area (DOE GTP) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Radiometrics At Fort Bliss Area (DOE GTP) Exploration Activity Details Location Fort Bliss Area Exploration Technique Radiometrics Activity Date Usefulness not indicated DOE-funding Unknown References (1 January 2011) GTP ARRA Spreadsheet Retrieved from "http://en.openei.org/w/index.php?title=Radiometrics_At_Fort_Bliss_Area_(DOE_GTP)&oldid=402615" Categories: Exploration Activities DOE Funded Activities ARRA Funded Activities What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 1863747441

63

Standard Test Method for Calibration of Non-Concentrator Photovoltaic Secondary Reference Cells  

E-Print Network (OSTI)

1.1 This test method covers calibration and characterization of secondary terrestrial photovoltaic reference cells to a desired reference spectral irradiance distribution. The recommended physical requirements for these reference cells are described in Specification E1040. Reference cells are principally used in the determination of the electrical performance of a photovoltaic device. 1.2 Secondary reference cells are calibrated indoors using simulated sunlight or outdoors in natural sunlight by reference to a primary reference cell previously calibrated to the same desired reference spectral irradiance distribution. 1.3 Secondary reference cells calibrated according to this test method will have the same radiometric traceability as the of the primary reference cell used for the calibration. Therefore, if the primary reference cell is traceable to the World Radiometric Reference (WRR, see Test Method E816), the resulting secondary reference cell will also be traceable to the WRR. 1.4 This test method appli...

American Society for Testing and Materials. Philadelphia

2010-01-01T23:59:59.000Z

64

MOBY calibration  

Science Conference Proceedings (OSTI)

... of the MOBY spar, researchers work on the the facility. ... In particular, ocean color radiometry provides essential information about phytoplankton ...

2013-04-15T23:59:59.000Z

65

Calibration of fluorescence resonance energy transfer in microscopy  

DOE Patents (OSTI)

Imaging hardware, software, calibrants, and methods are provided to visualize and quantitate the amount of Fluorescence Resonance Energy Transfer (FRET) occurring between donor and acceptor molecules in epifluorescence microscopy. The MicroFRET system compensates for overlap among donor, acceptor, and FRET spectra using well characterized fluorescent beads as standards in conjunction with radiometrically calibrated image processing techniques. The MicroFRET system also provides precisely machined epifluorescence cubes to maintain proper image registration as the sample is illuminated at the donor and acceptor excitation wavelengths. Algorithms are described that pseudocolor the image to display pixels exhibiting radiometrically-corrected fluorescence emission from the donor (blue), the acceptor (green) and FRET (red). The method is demonstrated on samples exhibiting FRET between genetically engineered derivatives of the Green Fluorescent Protein (GFP) bound to the surface of Ni chelating beads by histidine-tags.

Youvan, Douglas C. (San Jose, CA); Silva, Christopher M. (Sunnyvale, CA); Bylina, Edward J. (San Jose, CA); Coleman, William J. (Moutain View, CA); Dilworth, Michael R. (Santa Cruz, CA); Yang, Mary M. (San Jose, CA)

2002-09-24T23:59:59.000Z

66

Realistic Uncertainties in Pressure and Temperature Calibration Reference Values  

Science Conference Proceedings (OSTI)

Field instruments require calibration against standards that introduce-insignificant errors of their own in the process. This paper discusses a pressure and temperature calibration facility, analyzes the error levels attained in its routine use ...

Julian M. Pike

1984-06-01T23:59:59.000Z

67

ARM - Information for Guest Scientists  

NLE Websites -- All DOE Office Websites (Extended Search)

Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact...

68

Non-Destructive Analysis Calibration Standards for Gaseous Diffusion...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Analysis Calibration Standards for Gaseous Diffusion Plant (GDP) Decommissioning The decommissioning of Gaseous Diffusion Plant facilities requires accurate, non-destructive...

69

QAS 2.4 Instrument Calibration 5/26/95  

Energy.gov (U.S. Department of Energy (DOE))

The objective of this surveillance is to evaluate the implementation of the contractor's program to routinely calibrate instruments, alarms, and sensors. The Facility Representative observes...

70

Appendix D: Facility Process Data and Appendix E: Equipment Calibratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets Appendix D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets Docket No. EO-05-01:...

71

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2007 [Facility News] 30, 2007 [Facility News] Improved Instrument Calibration Capabilities Benefit All Sites, Users Bookmark and Share To ensure that ARM precipitation measurements are as accurate as possible, the SGP rain gauges (white cylinder above left) are inspected every two weeks, are statically calibrated in the field every six months, and will now be dynamically calibrated on an annual basis using the system shown above. To ensure that ARM precipitation measurements are as accurate as possible, the SGP rain gauges (white cylinder above left) are inspected every two weeks, are statically calibrated in the field every six months, and will now be dynamically calibrated on an annual basis using the system shown above. The ARM fills a unique position in the scientific community by obtaining

72

Inference of Cloud Optical Depth from Aircraft-Based Solar Radiometric Measurements  

Science Conference Proceedings (OSTI)

A method is introduced for inferring cloud optical depth ? from solar radiometric measurements made on an aircraft at altitude z. It is assessed using simulated radiometric measurements produced by a 3D Monte Carlo algorithm acting on fields of ...

H. W. Barker; A. Marshak; W. Szyrmer; J-P. Blanchet; A. Trishchenko; Z. Li

2002-07-01T23:59:59.000Z

73

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

June 15, 2006 [Facility News] June 15, 2006 [Facility News] Data From Rotating Shadowband Spectroradiometer Now Available in Data Archive Bookmark and Share The Rotating Shadowband Spectroradiometer (RSS) is calibrated bi-weekly with external lamp calibrators for accuracy. The Rotating Shadowband Spectroradiometer (RSS) is calibrated bi-weekly with external lamp calibrators for accuracy. After refinements based on a series of successful field trials, the latest Rotating Shadowband Spectroradiometer (RSS) joins the collection of permanent ARM instruments at the ARM Southern Great Plains (SGP) site. The current RSS-known as the RSS105-is deployed at the SGP Central Facility and is the first commercially built RSS manufactured by Yankee Environmental Systems, Inc. Since its deployment in May 2003, the RSS has

74

Pyranometer calibration: leveling errors and cosine effect  

DOE Green Energy (OSTI)

The solar monitoring system for the Sandia Total Energy Systems Test Facility consists of a fixed, horizontal pyranometer and a tracking pyranometer and pyrheliometer. Readout uses a scanned A-D converter with recording via print-out, magnetic tape, or disk. The Eppley pyrheliometer is calibrated by direct comparison with a Kendall electrically-calibrated radiometer. The pyranometers, model PSP, also from Eppley, are calibrated against the pyrheliometer using shading techniques; and the parameters affecting that calibration are the subject of this summary.

Thacher, P.D.; Petterson, B.J.

1977-01-01T23:59:59.000Z

75

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 31, 2009 [Facility News] March 31, 2009 [Facility News] New Sensors Installed for Cloud Radar Calibration at North Slope Bookmark and Share Located on the roof of the Guest Instrument Facility at the ARM Barrow site are the PARSIVEL (left) and POSS (right) instruments. Located on the roof of the Guest Instrument Facility at the ARM Barrow site are the PARSIVEL (left) and POSS (right) instruments. Cloud radars at the ARM sites provide important information about cloud properties and continue to evolve in providing climate researchers more complex data. This creates a greater need to know the absolute calibration of the radar reflectivity measurement. However, the large and immobile antenna for the millimeter wavelength cloud radar (MMCR) is impossible to point directly at a calibration target. At the ARM North Slope of Alaska

76

Radiometric Characterization and Absolute Calibration of the Marine Optical System (MOS) Bench Unit  

Science Conference Proceedings (OSTI)

The Marine Optical System (MOS) is a dual charge-coupled device (CCD)-based spectrograph system developed for in-water measurements of downwelling solar irradiance Ed and upwelling radiance Lu. These measurements are currently used in the ...

Catherine Habauzit; Steven W. Brown; Keith R. Lykke; B. Carol Johnson; Michael E. Feinholz; Mark Yarbrough; Dennis K. Clark

2003-03-01T23:59:59.000Z

77

Onboard Real-Time Absolute Radiometric Calibration for Thermal Infrared Channels of Chinese Geostationary Meteorological Satellites  

Science Conference Proceedings (OSTI)

Forty-one cloud-free images of Qinghai Lake (QHL) in China and the corresponding digital numbers (DNs) of FengYun-2C (FY-2C) at 0000, 0600, 1200, and 1800 UTC from 1 July to 30 September 2005 are analyzed. The corresponding surface water ...

Jinjun Tong; Stephen J. Dry; Bo Hu; Yun Chen; Changjun Yang; Zhiguo Rong

2009-02-01T23:59:59.000Z

78

The Radiometric Calibration Budget for the High-Resolution Dynamics Limb Sounder  

Science Conference Proceedings (OSTI)

The High-Resolution Dynamics Limb Sounder is a 21-channel infrared filter radiometer due to be launched on the Earth Observing System Chemistry platform in 2002. The channels range in wavelength from 6.1 to 17.8 ?m, with fractional widths of ...

C. W. P. Palmer; J. G. Whitney

1996-04-01T23:59:59.000Z

79

Flowmeter Calibration Facility for Heated Gas Mixtures  

Science Conference Proceedings (OSTI)

... water condenses back to the liquid phase. ... the carbon dioxide goes through two stages of ... degree turn, a low pressure-drop flow conditioner, and ...

2012-09-15T23:59:59.000Z

80

Thermocouples Calibrations Services  

Science Conference Proceedings (OSTI)

... Only bare wires are needed for NIST thermocouple calibrations. ... The minimum length for thermocouple wire submitted for calibration should be at ...

2013-06-11T23:59:59.000Z

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Radiometer Calibration Trends  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiometer Calibration Trends S. M. Wilcox, T. L. Stoffel, and D. R. Myers National Renewable Energy Laboratory Golden, Colorado Abstract Calibrations of Atmospheric Radiation...

82

Calibrations and Special Tests  

Science Conference Proceedings (OSTI)

... assurance measurements. Periodically we perform internal quality audits equivalent to ISO 17025. Calibrations reports ...

2011-10-28T23:59:59.000Z

83

The 2004 North Slope of Alaska Arctic Winter Radiometric Experiment  

NLE Websites -- All DOE Office Websites (Extended Search)

2004 North Slope of Alaska 2004 North Slope of Alaska Arctic Winter Radiometric Experiment E. R. Westwater, M. A. Klein, and V. Leuski Cooperative Institute for Research in Environmental Sciences University of Colorado National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado A. J. Gasiewski, T. Uttal, and D. A. Hazen National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado D. Cimini Remote Sensing Division, CETEMPS Universita' dell'Aquila L'Aquila, Italy V. Mattioli Dipartimento di Ingegneria Elettronica e dell'Informazione Perugia, Italy B. L. Weber and S. Dowlatshahi Science Technology Corporation Boulder, Colorado J. A. Shaw Department of Electrical and Computer Engineering

84

Integrated Calibration Sphere and Calibration Step Fixture for Improved  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Calibration Sphere and Calibration Step Fixture for Integrated Calibration Sphere and Calibration Step Fixture for Improved Coordinate Measurement Machine Calibration Integrated Calibration Sphere and Calibration Step Fixture for Improved Coordinate Measurement Machine Calibration A method and apparatus for mounting a calibration sphere to a calibration fixture for Coordinate Measurement Machine (CMM) calibration and qualification is described, decreasing the time required for such qualification, thus allowing the CMM to be used more productively. Available for thumbnail of Feynman Center (505) 665-9090 Email Integrated Calibration Sphere and Calibration Step Fixture for Improved Coordinate Measurement Machine Calibration A method and apparatus for mounting a calibration sphere to a calibration fixture for Coordinate Measurement Machine (CMM) calibration and

85

Required Calibrations Legal Document  

Science Conference Proceedings (OSTI)

... This document is a Calibration Cooperative Research and Development Agreement (C-CRADA) between your company and NIST. ...

2013-07-17T23:59:59.000Z

86

Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature  

E-Print Network (OSTI)

Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction CENTER FOR IMAGING SCIENCE Title of Dissertation: Radiometric Modeling of Mechanical Draft Cooling Towers of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature from Remote Thermal

Salvaggio, Carl

87

RADCAL Operations Manual Radiation Calibration Laboratory Protocol  

SciTech Connect

The Life Sciences Division (LSD) of Oak Ridge National Laboratory (ORNL) has a long record of radiation dosimetry research, primarily using the Health Physics Research Reactor (HPRR) and the Radiation Calibration Laboratory (RADCAL) in its Dosimetry Applications Research (DOSAR) Program. These facilities have been used by a broad segment of the research community to perform a variety of experiments in areas including, but not limited to, radiobiology, radiation dosimeter and instrumentation development and calibration, and the testing of materials in a variety of radiation environments. Operations of the HPRR were terminated in 1987 and the reactor was moved to storage at the Oak Ridge Y-12 Plant; however, RADCAL will continue to be operated in accordance with the guidelines of the National Institute of Standards and Technology (NIST) Secondary Calibration Laboratory program and will meet all requirements for testing dosimeters under the National Voluntary Laboratory Accreditation Program (NVLAP). This manual is to serve as the primary instruction and operation manual for the Oak Ridge National Laboratory's RADCAL facility. Its purpose is to (1) provide operating protocols for the RADCAL facility, (2) outline the organizational structure, (3) define the Quality Assurance Action Plan, and (4) describe all the procedures, operations, and responsibilities for the safe and proper operation of all routine aspects of the calibration facility.

Bogard, J.S.

1998-12-01T23:59:59.000Z

88

Non-Destructive Analysis Calibration Standards for Gaseous Diffusion Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Destructive Analysis Calibration Standards for Gaseous Non-Destructive Analysis Calibration Standards for Gaseous Diffusion Plant (GDP) Decommissioning Non-Destructive Analysis Calibration Standards for Gaseous Diffusion Plant (GDP) Decommissioning The decommissioning of Gaseous Diffusion Plant facilities requires accurate, non-destructive assay (NDA) of residual enriched uranium in facility components for safeguards and nuclear criticality safety purposes. Current practices used to perform NDA measurements frequently have poorly defined uncertainties due to multiple factors. Working reference material (WRM) standards and container-specific surrogates are required to verify and validate NDA methods used to support characterization of gaseous diffusion equipment within the D&D project. Because working reference

89

Procedure for Generating Data Quality Reports for SIRS Radiometric Measurements  

NLE Websites -- All DOE Office Websites (Extended Search)

Procedure for Generating Data Quality Reports Procedure for Generating Data Quality Reports for SIRS Radiometric Measurements M. H. L. Anderberg, F. P. Rael, and T. L. Stoffell National Renewable Energy Laboratory Golden, Colorado Introduction The Atmospheric Radiation Measurement (ARM) Program needs high-quality broadband shortwave (SW) (solar) and longwave (LW) irradiance information for the development and validation of atmospheric circulation and climate models. To this end, the National Renewable Energy Laboratory (NREL) performs a quality assessment of the data from 22 Solar Infrared Stations (SIRS) in the Southern Great Plains (SGP). Data quality reports (DQRs) are instrumental in passing the resultant information to the scientific community. The value of these reports depends on clear and consistent

90

Welcome to NIST Calibrations  

Science Conference Proceedings (OSTI)

... In general, this C-CRADA protects your calibration information as well as providing you with a firm price quote, explaining invoicing information ...

2013-07-17T23:59:59.000Z

91

Thermometry Calibration Services  

Science Conference Proceedings (OSTI)

... Hygrometers chilled mirror electric ... If you are sending an SPRT for calibration, please measure the triple point of water resistance R(TPW ...

2013-06-12T23:59:59.000Z

92

Uncertainty and Dimensional Calibrations  

Science Conference Proceedings (OSTI)

... are very sensitive to the size and condition of the ... is the same as steel for our conditions. ... a calibrated linear variable differen- tial transformer (LVDT ...

2013-06-16T23:59:59.000Z

93

Nuclear Facilities Production Facilities  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration under contract DE-AC04-94AL85000. Sand 2011-4582P. ENERGY U.S. DEPARTMENT OF Gamma Irradiation Facility (GIF) The GIF provides test cells for...

94

Distribution of Tropospheric Water Vapor in Clear and Cloudy Conditions from Microwave Radiometric Profiling  

Science Conference Proceedings (OSTI)

A dataset gathered over 369 days in various midlatitude sites with a 12-frequency microwave radiometric profiler is used to analyze the statistical distribution of tropospheric water vapor content (WVC) in clear and cloudy conditions. The WVC ...

Alia Iassamen; Henri Sauvageot; Nicolas Jeannin; Soltane Ameur

2009-03-01T23:59:59.000Z

95

Multichannel Microwave Radiometric Observations at Saipan during the 1990 Tropical Cyclone Motion Experiment  

Science Conference Proceedings (OSTI)

To estimate mesoscale variations in integrated water vapor, cloud liquid water, and temperature in a tropical region, multiwavelength microwave radiometric observations were carried out over a seven-week period on the island of Saipan during the ...

Yong Han; Dennis W. Thomson

1994-02-01T23:59:59.000Z

96

Inferring Optical Depth of Broken Clouds above Green Vegetation Using Surface Solar Radiometric Measurements  

Science Conference Proceedings (OSTI)

A method for inferring cloud optical depth ? is introduced and assessed using simulated surface radiometric measurements produced by a Monte Carlo algorithm acting on fields of broken, single-layer, boundary layer clouds derived from Landsat ...

Howard W. Barker; Alexander Marshak

2001-10-01T23:59:59.000Z

97

Estimation of Surface Turbulent Fluxes through Assimilation of Radiometric Surface Temperature Sequences  

Science Conference Proceedings (OSTI)

A model of land surface energy balance is used as a constraint on the estimation of factors characterizing land surface influences on evaporation and turbulent heat transfer from sequences of radiometric surface temperature measurements. The ...

Francesca Caparrini; Fabio Castelli; Dara Entekhabi

2004-02-01T23:59:59.000Z

98

Sensible Heat Flux-Radiometric Surface Temperature Relationship for Eight Semiarid Areas  

Science Conference Proceedings (OSTI)

Measurements of sensible heat flux, radiometric surface temperature, air temperature, and wind speed made at eight semiarid rangeland sites were used to investigate the sensible heat flux-aerodynamic resistance relationship. The individual sites ...

J. B. Stewart; W. P. Kustas; K. S. Humes; W. D. Nichols; M. S. Moran; H. A. R. de Bruin

1994-09-01T23:59:59.000Z

99

Feasibility Test of Multifrequency Radiometric Data Assimilation to Estimate Snow Water Equivalent  

Science Conference Proceedings (OSTI)

A season-long, point-scale radiometric data assimilation experiment is performed in order to test the feasibility of snow water equivalent (SWE) estimation. Synthetic passive microwave observations at Special Sensor Microwave Imager (SSM/I) and ...

Michael Durand; Steven A. Margulis

2006-06-01T23:59:59.000Z

100

Radiometrics At Salt Wells Area (Coolbaugh, Et Al., 2006) | Open Energy  

Open Energy Info (EERE)

Radiometrics At Salt Wells Area (Coolbaugh, Et Al., 2006) Radiometrics At Salt Wells Area (Coolbaugh, Et Al., 2006) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Radiometrics At Salt Wells Area (Coolbaugh, Et Al., 2006) Exploration Activity Details Location Salt Wells Geothermal Area Exploration Technique Radiometrics Activity Date 2005 - 2005 Usefulness useful DOE-funding Unknown Exploration Basis Geochemical water sampling, mineral distribution mapping, and shallow (30 cm) temperature probe measurements were conducted to expand on a previous field mapping study of surface geothermal features at Salt Wells, in order to evaluate the relationship between these features and structures that control geothermal fluid flow. Notes Borate minerals tincalconite and borax, sodium sulfate minerals mirabilite

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Calibration method for spectroscopic systems  

DOE Patents (OSTI)

Calibration spots of optically-characterized material placed in the field of view of a spectroscopic system allow calibration of the spectroscopic system. Response from the calibration spots is measured and used to calibrate for varying spectroscopic system operating parameters. The accurate calibration achieved allows quantitative spectroscopic analysis of responses taken at different times, different excitation conditions, and of different targets. 3 figs.

Sandison, D.R.

1998-11-17T23:59:59.000Z

102

Fluid Metrology Calibration Services - Water Flow  

Science Conference Proceedings (OSTI)

Fluid Metrology Calibration Services - Water Flow. Water Flow Calibrations 18020C. ... NIST provides calibration services for water flow meters. ...

2011-10-03T23:59:59.000Z

103

Roundness calibration standard  

DOE Patents (OSTI)

A roundness calibration standard is provided with a first arc constituting the major portion of a circle and a second arc lying between the remainder of the circle and the chord extending between the ends of said first arc.

Burrus, B.M.

1982-01-29T23:59:59.000Z

104

Roundness calibration standard  

DOE Patents (OSTI)

A roundness calibration standard is provided with a first arc constituting the major portion of a circle and a second arc lying between the remainder of the circle and the chord extending between the ends of said first arc.

Burrus, Brice M. (6620 Wachese La., Knoxville, TN 37912)

1984-01-01T23:59:59.000Z

105

Integrated calibration sphere and calibration step fixture for improved coordinate measurement machine calibration  

DOE Patents (OSTI)

A method and apparatus for mounting a calibration sphere to a calibration fixture for Coordinate Measurement Machine (CMM) calibration and qualification is described, decreasing the time required for such qualification, thus allowing the CMM to be used more productively. A number of embodiments are disclosed that allow for new and retrofit manufacture to perform as integrated calibration sphere and calibration fixture devices. This invention renders unnecessary the removal of a calibration sphere prior to CMM measurement of calibration features on calibration fixtures, thereby greatly reducing the time spent qualifying a CMM.

Clifford, Harry J. (Los Alamos, NM)

2011-03-22T23:59:59.000Z

106

Standard Test Method for Calibration of Primary Non-Concentrator Terrestrial Photovoltaic Reference Cells Using a Tabular Spectrum  

E-Print Network (OSTI)

1.1 This test method is intended to be used for calibration and characterization of primary terrestrial photovoltaic reference cells to a desired reference spectral irradiance distribution, such as Tables G173. The recommended physical requirements for these reference cells are described in Specification E1040. Reference cells are principally used in the determination of the electrical performance of photovoltaic devices. 1.2 Primary photovoltaic reference cells are calibrated in natural sunlight using the relative spectral response of the cell, the relative spectral distribution of the sunlight, and a tabulated reference spectral irradiance distribution. 1.3 This test method requires the use of a pyrheliometer that is calibrated according to Test Method E816, which requires the use of a pyrheliometer that is traceable to the World Radiometric Reference (WRR). Therefore, reference cells calibrated according to this test method are traceable to the WRR. 1.4 This test method is a technique that may be used ...

American Society for Testing and Materials. Philadelphia

2010-01-01T23:59:59.000Z

107

Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

FLEX lab image, windows testing lab, scientist inside a lab, Research Facilities EETD maintains advanced research and test facilities for buildings, energy technologies, air...

108

Absolute spectral radiance responsivity calibration of sun photometers  

SciTech Connect

Sun photometers are designed to measure direct solar irradiance and diffused sky radiance for the purpose of atmospheric parameters characterization. A sun photometer is usually calibrated by using a lamp-illuminated integrating sphere source for its band-averaged radiance responsivity, which normally has an uncertainty of 3%-5% at present. Considering the calibration coefficients may also change with time, a regular high precision calibration is important to maintain data quality. In this paper, a tunable-laser-based facility for spectral radiance responsivity calibration has been developed at the Key Laboratory of Optical Calibration and Characterization, Chinese Academy of Sciences. A reference standard radiance radiometer, calibrated against cryogenic radiometer, is used to determine the radiance from a laser-illuminated integrating sphere source. Spectral radiance responsivity of CIMEL CE318-2 sun photometer is calibrated using this new calibration system with a combined standard uncertainty of about 0.8%. As a validation, the derived band-averaged radiance responsivity are compared to that from a Goddard Space Flight Center lamp-based sphere calibration and good agreements (difference <1.4%) are found from 675 to 1020 nm bands.

Xu Qiuyun; Zheng Xiaobing; Zhang Wei; Wang Xianhua; Li Jianjun; Li Xin [Key Laboratory of Optical Calibration and Characterization, Chinese Academy of Sciences, Hefei 230031 (China); Li Zhengqiang [Laboratoire d'Optique Atmospherique, Universite Lille 1, Villeneuve d'Ascq 59655 (France) and State Key Laboratory of Remote Sensing Science, Institute of Remote Sensing Applications, Chinese Academy of Sciences, Beijing 100101 (China)

2010-03-15T23:59:59.000Z

109

Facility Microgrids  

Science Conference Proceedings (OSTI)

Microgrids are receiving a considerable interest from the power industry, partly because their business and technical structure shows promise as a means of taking full advantage of distributed generation. This report investigates three issues associated with facility microgrids: (1) Multiple-distributed generation facility microgrids' unintentional islanding protection, (2) Facility microgrids' response to bulk grid disturbances, and (3) Facility microgrids' intentional islanding.

Ye, Z.; Walling, R.; Miller, N.; Du, P.; Nelson, K.

2005-05-01T23:59:59.000Z

110

Radiometrics At Salt Wells Area (Henkle, Et Al., 2005) | Open Energy  

Open Energy Info (EERE)

Salt Wells Area (Henkle, Et Al., 2005) Salt Wells Area (Henkle, Et Al., 2005) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Radiometrics At Salt Wells Area (Henkle, Et Al., 2005) Exploration Activity Details Location Salt Wells Area Exploration Technique Radiometrics Activity Date - 2005 Usefulness could be useful with more improvements DOE-funding Unknown Exploration Basis Adsorbed mercury soil geochemical surveys and radiometric geophysical surveys were carried out in conjunction with geologic mapping to test the application of these ground-based techniques to geothermal exploration at three prospects in Nevada by Henkle Jr. et al. in 2005. Notes Soil sampling and geophysical surveys were conducted at 26 stations along an approximately 1981-m-long line oriented perpendicular to known major

111

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Southern Great Plains Site Hosts Gathering to Discuss ARM Instrumentation Southern Great Plains Site Hosts Gathering to Discuss ARM Instrumentation Bookmark and Share Field calibration of the rotating shadowband radiometer (RSS) is performed by the RSS instrument mentor (left) and a colleague from SGP operations. Field calibration of the rotating shadowband radiometer (RSS) is performed by the RSS instrument mentor (left) and a colleague from SGP operations. With research facilities around the globe, one of the biggest challenges faced by ARM is communication and consistent application of new information and instrument advances. In early August, about 45 ARM scientists and engineers gathered at the ARM Southern Great Plains site for a three-day interactive meeting to promote information exchange between instrument mentors and site operations personnel. Meeting participants included

112

Uncertainty and calibration analysis  

SciTech Connect

All measurements contain some deviation from the true value which is being measured. In the common vernacular this deviation between the true value and the measured value is called an inaccuracy, an error, or a mistake. Since all measurements contain errors, it is necessary to accept that there is a limit to how accurate a measurement can be. The undertainty interval combined with the confidence level, is one measure of the accuracy for a measurement or value. Without a statement of uncertainty (or a similar parameter) it is not possible to evaluate if the accuracy of the measurement, or data, is appropriate. The preparation of technical reports, calibration evaluations, and design calculations should consider the accuracy of measurements and data being used. There are many methods to accomplish this. This report provides a consistent method for the handling of measurement tolerances, calibration evaluations and uncertainty calculations. The SRS Quality Assurance (QA) Program requires that the uncertainty of technical data and instrument calibrations be acknowledged and estimated. The QA Program makes some specific technical requirements related to the subject but does not provide a philosophy or method on how uncertainty should be estimated. This report was prepared to provide a technical basis to support the calculation of uncertainties and the calibration of measurement and test equipment for any activity within the Experimental Thermal-Hydraulics (ETH) Group. The methods proposed in this report provide a graded approach for estimating the uncertainty of measurements, data, and calibrations. The method is based on the national consensus standard, ANSI/ASME PTC 19.1.

Coutts, D.A.

1991-03-01T23:59:59.000Z

113

Mercury Calibration System  

Science Conference Proceedings (OSTI)

U.S. Environmental Protection Agency (EPA) Performance Specification 12 in the Clean Air Mercury Rule (CAMR) states that a mercury CEM must be calibrated with National Institute for Standards and Technology (NIST)-traceable standards. In early 2009, a NIST traceable standard for elemental mercury CEM calibration still does not exist. Despite the vacature of CAMR by a Federal appeals court in early 2008, a NIST traceable standard is still needed for whatever regulation is implemented in the future. Thermo Fisher is a major vendor providing complete integrated mercury continuous emissions monitoring (CEM) systems to the industry. WRI is participating with EPA, EPRI, NIST, and Thermo Fisher towards the development of the criteria that will be used in the traceability protocols to be issued by EPA. An initial draft of an elemental mercury calibration traceability protocol was distributed for comment to the participating research groups and vendors on a limited basis in early May 2007. In August 2007, EPA issued an interim traceability protocol for elemental mercury calibrators. Various working drafts of the new interim traceability protocols were distributed in late 2008 and early 2009 to participants in the Mercury Standards Working Committee project. The protocols include sections on qualification and certification. The qualification section describes in general terms tests that must be conducted by the calibrator vendors to demonstrate that their calibration equipment meets the minimum requirements to be established by EPA for use in CAMR monitoring. Variables to be examined include linearity, ambient temperature, back pressure, ambient pressure, line voltage, and effects of shipping. None of the procedures were described in detail in the draft interim documents; however they describe what EPA would like to eventually develop. WRI is providing the data and results to EPA for use in developing revised experimental procedures and realistic acceptance criteria based on actual capabilities of the current calibration technology. As part of the current effort, WRI worked with Thermo Fisher elemental mercury calibrator units to conduct qualification experiments to demonstrate their performance characteristics under a variety of conditions and to demonstrate that they qualify for use in the CEM calibration program. Monitoring of speciated mercury is another concern of this research. The mercury emissions from coal-fired power plants are comprised of both elemental and oxidized mercury. Current CEM analyzers are designed to measure elemental mercury only. Oxidized mercury must first be converted to elemental mercury prior to entering the analyzer inlet in order to be measured. CEM systems must demonstrate the ability to measure both elemental and oxidized mercury. This requires the use of oxidized mercury generators with an efficient conversion of the oxidized mercury to elemental mercury. There are currently two basic types of mercuric chloride (HgCl{sub 2}) generators used for this purpose. One is an evaporative HgCl{sub 2} generator, which produces gas standards of known concentration by vaporization of aqueous HgCl{sub 2} solutions and quantitative mixing with a diluent carrier gas. The other is a device that converts the output from an elemental Hg generator to HgCl{sub 2} by means of a chemical reaction with chlorine gas. The Thermo Fisher oxidizer system involves reaction of elemental mercury vapor with chlorine gas at an elevated temperature. The draft interim protocol for oxidized mercury units involving reaction with chlorine gas requires the vendors to demonstrate high efficiency of oxidation of an elemental mercury stream from an elemental mercury vapor generator. The Thermo Fisher oxidizer unit is designed to operate at the power plant stack at the probe outlet. Following oxidation of elemental mercury from reaction with chlorine gas, a high temperature module reduces the mercuric chloride back to elemental mercury. WRI conducted work with a custom laboratory configured stand-alone oxidized mercury generator unit prov

John Schabron; Eric Kalberer; Joseph Rovani; Mark Sanderson; Ryan Boysen; William Schuster

2009-03-11T23:59:59.000Z

114

Application: Facilities  

Science Conference Proceedings (OSTI)

... Option.. Papavergos, PG; 1991. Halon 1301 Use in Oil and Gas Production Facilities: Alaska's North Slope.. Ulmer, PE; 1991. ...

2011-12-22T23:59:59.000Z

115

Calibration Procedures: Standard Operating Procedures  

Science Conference Proceedings (OSTI)

... 18, Calibration of Graduated Neck-Type Metal Volumetric Field Standards, Volumetric Transfer Method Revision ... 20, Standard Deviation and Range ...

2013-09-03T23:59:59.000Z

116

Radiometric compensation for a low-cost immersive projection system Julien DEHOS  

E-Print Network (OSTI)

Radiometric compensation for a low-cost immersive projection system Julien DEHOS Eric ZEGHERS Catopsys is a low-cost projection system aiming at making mixed reality (virtual, augmented or diminished the optical axis of P. the home by developing a low-cost immersive projection system. This system is composed

Paris-Sud XI, Université de

117

Determination of Cloud Liquid Water Distribution by Inversion of Radiometric Data  

Science Conference Proceedings (OSTI)

A method is described whereby the distribution of liquid water through a cross section of a cloud may be determined from radiometric data. It involves the scanning of the cloud by a pair of ground-based centimeter wave radiometers and measuring ...

J. Warner; J. F. Drake; P. R. Krehbiel

1985-09-01T23:59:59.000Z

118

Calibrated vapor generator source  

DOE Patents (OSTI)

A portable vapor generator is disclosed that can provide a controlled source of chemical vapors, such as, narcotic or explosive vapors. This source can be used to test and calibrate various types of vapor detection systems by providing a known amount of vapors to the system. The vapor generator is calibrated using a reference ion mobility spectrometer. A method of providing this vapor is described, as follows: explosive or narcotic is deposited on quartz wool, placed in a chamber that can be heated or cooled (depending on the vapor pressure of the material) to control the concentration of vapors in the reservoir. A controlled flow of air is pulsed over the quartz wool releasing a preset quantity of vapors at the outlet.

Davies, John P. (Idaho Falls, ID); Larson, Ronald A. (Idaho Falls, ID); Goodrich, Lorenzo D. (Shelley, ID); Hall, Harold J. (Idaho Falls, ID); Stoddard, Billy D. (Idaho Falls, ID); Davis, Sean G. (Idaho Falls, ID); Kaser, Timothy G. (Idaho Falls, ID); Conrad, Frank J. (Albuquerque, NM)

1995-01-01T23:59:59.000Z

119

Calibrated vapor generator source  

DOE Patents (OSTI)

A portable vapor generator is disclosed that can provide a controlled source of chemical vapors, such as, narcotic or explosive vapors. This source can be used to test and calibrate various types of vapor detection systems by providing a known amount of vapors to the system. The vapor generator is calibrated using a reference ion mobility spectrometer. A method of providing this vapor is described, as follows: explosive or narcotic is deposited on quartz wool, placed in a chamber that can be heated or cooled (depending on the vapor pressure of the material) to control the concentration of vapors in the reservoir. A controlled flow of air is pulsed over the quartz wool releasing a preset quantity of vapors at the outlet. 10 figs.

Davies, J.P.; Larson, R.A.; Goodrich, L.D.; Hall, H.J.; Stoddard, B.D.; Davis, S.G.; Kaser, T.G.; Conrad, F.J.

1995-09-26T23:59:59.000Z

120

Mesoscale hybrid calibration artifact  

DOE Patents (OSTI)

A mesoscale calibration artifact, also called a hybrid artifact, suitable for hybrid dimensional measurement and the method for make the artifact. The hybrid artifact has structural characteristics that make it suitable for dimensional measurement in both vision-based systems and touch-probe-based systems. The hybrid artifact employs the intersection of bulk-micromachined planes to fabricate edges that are sharp to the nanometer level and intersecting planes with crystal-lattice-defined angles.

Tran, Hy D. (Albuquerque, NM); Claudet, Andre A. (Albuquerque, NM); Oliver, Andrew D. (Waltham, MA)

2010-09-07T23:59:59.000Z

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

TIME CALIBRATED OSCILLOSCOPE SWEEP  

DOE Patents (OSTI)

The time calibrator of an electric signal displayed on an oscilloscope is described. In contrast to the conventional technique of using time-calibrated divisions on the face of the oscilloscope, this invention provides means for directly superimposing equal time spaced markers upon a signal displayed upon an oscilloscope. More explicitly, the present invention includes generally a generator for developing a linear saw-tooth voltage and a circuit for combining a high-frequency sinusoidal voltage of a suitable amplitude and frequency with the saw-tooth voltage to produce a resultant sweep deflection voltage having a wave shape which is substantially linear with respect to time between equal time spaced incremental plateau regions occurring once each cycle of the sinusoidal voltage. The foregoing sweep voltage when applied to the horizontal deflection plates in combination with a signal to be observed applied to the vertical deflection plates of a cathode ray oscilloscope produces an image on the viewing screen which is essentially a display of the signal to be observed with respect to time. Intensified spots, or certain other conspicuous indications corresponding to the equal time spaced plateau regions of said sweep voltage, appear superimposed upon said displayed signal, which indications are therefore suitable for direct time calibration purposes.

Owren, H.M.; Johnson, B.M.; Smith, V.L.

1958-04-22T23:59:59.000Z

122

Surveillance Guides - QAS 2.4 Instrument Calibration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INSTRUMENT CALIBRATION INSTRUMENT CALIBRATION 1.0 Objective The objective of this surveillance is to evaluate the implementation of the contractor's program to routinely calibrate instruments, alarms, and sensors. The Facility Representative observes calibration testing of instruments and channels and reviews supporting documentation to verify compliance with applicable Department of Energy requirements and implementation of best industry practices. 2.0 References 2.1 DOE 5700.6C, Quality Assurance 2.2 DOE 4330.4B, Maintenance Management Program 3.0 Requirements Implemented This surveillance is conducted to implement requirement QA-0009 from the RL S/RID. This requirement is extracted from DOE 5700.6C. 4.0 Surveillance Activities

123

New Concepts for Radiometric Measurements of Environmental Samples  

Science Conference Proceedings (OSTI)

There is a long history of using radioisotopes to study a variety of environmental processes. The recent release of radioisotopes from the nuclear power facilities in Fukushima, Japan, prompted a review at Pacific Northwest National Laboratory (PNNL) of the current measurement practices applied to the measurement of actinides and radioactive fission products in the environment. The objective of this review is to identify gaps in measurement capability that might be addressed through research and development. The scope is limited to man-made radioisotopes in the environment related to nuclear power and nuclear weapons. The focus rests on actinides and fission products. This report presents the preliminary findings of the review.

Warren, Glen A.; Runkle, Robert C.

2013-05-01T23:59:59.000Z

124

User Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Lawrence Berkeley National Laboratory's National User Facilities are available for cooperative research with institutions and the private sector worldwide. The Environmental...

125

SunLab Test Facilities  

DOE Green Energy (OSTI)

The U.S. Department of Energy maintains two major test facilities in support of its Solar Thermal Electric Program--Sandia's National Solar Thermal Test Facility (NSTTF) in Albuquerque, New Mexico, and NREL's High-Flux Solar Furnace (HFSF) in Golden, Colorado. Manufacturers can use the NSTTF to test new designs, ideas, and products in an outdoor environment much like the environment the equipment will be in when it is used in the field; the operational characteristics and size of NREL's 10-kilowatt HFSF make it ideal for testing prototype hardware and calibrating flux gauges, which are used to measure levels of concentrated sunlight.

Not Available

1997-11-01T23:59:59.000Z

126

An Evaluation of Radiometric Products from Fixed-Depth and Continuous In-Water Profile Data from Moderately Complex Waters  

Science Conference Proceedings (OSTI)

Radiometric products determined from fixed-depth and continuous in-water profile data collected at a coastal site characterized by moderately complex waters were compared to investigate differences and limitations between the two measurement ...

Giuseppe Zibordi; Jean-Franois Berthon; Davide DAlimonte

2009-01-01T23:59:59.000Z

127

Ground-Based Microwave Radiometric Observations of Precipitable Water Vapor: A Comparison with Ground Truth from Two Radiosonde Observing Systems  

Science Conference Proceedings (OSTI)

Dual-channel microwave radiometric measurements of precipitable water vapor are compared with values determined from two types of radiosondes. The first type is used in conventional soundings taken by the National Weather Service. The second is ...

Ed R. Westwater; Michael J. Falls; Ingrid A. Popa Fotino

1989-08-01T23:59:59.000Z

128

Mobile Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Facility AMF Information Science Architecture Baseline Instruments AMF1 AMF2 AMF3 Data Operations AMF Fact Sheet Images Contacts AMF Deployments Hyytiälä, Finland, 2014 Manacapuru, Brazil, 2014 Oliktok Point, Alaska, 2013 Los Angeles, California, to Honolulu, Hawaii, 2012 Cape Cod, Massachusetts, 2012 Gan Island, Maldives, 2011 Ganges Valley, India, 2011 Steamboat Springs, Colorado, 2010 Graciosa Island, Azores, 2009-2010 Shouxian, China, 2008 Black Forest, Germany, 2007 Niamey, Niger, 2006 Point Reyes, California, 2005 Mobile Facilities Pictured here in Gan, the second mobile facility is configured in a standard layout. Pictured here in Gan, the second mobile facility is configured in a standard layout. To explore science questions beyond those addressed by ARM's fixed sites at

129

Instructions for calibrating gamma detectors using the Canberra-Nuclear Data Genie Gamma Spectroscopy System  

SciTech Connect

A straight forward protocol provides a way to guide the calibration of a gamma detector for a particular geometry and material. Several programs have used the Low Level Gamma Counting Facility of the Health and Ecological Assessment Division of the Lawrence Livermore National Laboratory to count a variety of large environmental samples contained in several unique geometries. The equipment and calibration requirements needed to analyze these types of samples are explained. This document describes the calibration protocol that has been developed and describes how it is used to calibrate the detectors.

Brunk, J.L.

1995-09-01T23:59:59.000Z

130

Laser Power and Energy Calibrations  

Science Conference Proceedings (OSTI)

... calibration services for meters used with the lasers, wavelengths, and power ranges shown in the following table. Other laser wavelengths, power ...

2012-11-28T23:59:59.000Z

131

1000 Calibration Reports . . . And Counting  

Science Conference Proceedings (OSTI)

... day on average, with a 96 % on-time completion rate ... Photons transfer their energy to the detector as heat ... 10 pages long, with the costs of calibration ...

2013-01-03T23:59:59.000Z

132

Measurement Services (SRMs and Calibrations)  

Science Conference Proceedings (OSTI)

... SRMs are sold to industry for calibrating scientific instruments over an incredibly large ... G. Klouda, J. Moody, R. Parris, R. Schaffer, E. Steel, J. Taylor ...

2010-10-04T23:59:59.000Z

133

ARM - Site Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

Central FacilityInstruments Central FacilityInstruments SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts Instruments : Central Facility [ Single installation ] ACSM Aerosol Chemical Speciation Monitor Aerosols Browse Data [ Single installation ] AERI Atmospheric Emitted Radiance Interferometer Radiometric Browse Plots Browse Data [ Single installation ] AOS Aerosol Observing System Aerosols Browse Plots Browse Data [ Single installation ] BRS Broadband Radiometer Station Radiometric Browse Plots Browse Data [ Single installation ] BSRN Baseline Solar Radiation Network

134

Atmospheric optical calibration system  

DOE Patents (OSTI)

An atmospheric optical calibration system is provided to compare actual atmospheric optical conditions to standard atmospheric optical conditions on the basis of aerosol optical depth, relative air mass, and diffuse horizontal skylight to global horizontal photon flux ratio. An indicator can show the extent to which the actual conditions vary from standard conditions. Aerosol scattering and absorption properties, diffuse horizontal skylight to global horizontal photon flux ratio, and precipitable water vapor determined on a real-time basis for optical and pressure measurements are also used to generate a computer spectral model and for correcting actual performance response of a photovoltaic device to standard atmospheric optical condition response on a real-time basis as the device is being tested in actual outdoor conditions.

Hulstrom, Roland L. (Bloomfield, CO); Cannon, Theodore W. (Golden, CO)

1988-01-01T23:59:59.000Z

135

Atmospheric optical calibration system  

DOE Patents (OSTI)

An atmospheric optical calibration system is provided to compare actual atmospheric optical conditions to standard atmospheric optical conditions on the basis of aerosol optical depth, relative air mass, and diffuse horizontal skylight to global horizontal photon flux ratio. An indicator can show the extent to which the actual conditions vary from standard conditions. Aerosol scattering and absorption properties, diffuse horizontal skylight to global horizontal photon flux ratio, and precipitable water vapor determined on a real-time basis for optical and pressure measurements are also used to generate a computer spectral model and for correcting actual performance response of a photovoltaic device to standard atmospheric optical condition response on a real-time basis as the device is being tested in actual outdoor conditions. 7 figs.

Hulstrom, R.L.; Cannon, T.W.

1988-10-25T23:59:59.000Z

136

Nonradiometric and radiometric testing of radioiodine sorbents using methyl iodide  

SciTech Connect

A nonradiometric test of adsorbents and adsorbers with normal methyl iodide (CH/sub 3//sup 127/I) is desirable. Use of methyl radioiodide (CH/sub 3//sup 131/I) requires special precautions and facilities and results in bed contamination. However, first it must be established to what extent the removal of CH/sub 3//sup 127/I by adsorbents is indicative of the removal of CH/sub 3//sup 131/I. An experimental apparatus was built and used to simultaneously measure the penetrations of CH/sub 3/I molecules and the radioisotope in CH/sub 3//sup 131/I through charcoal absorbent beds. Gas chromatography with electron capture detection was used to measure CH/sub 3/I. Radioiodine was measured using charcoal traps within NaI scintillation well crystals. Real time (5-min interval) radioiodine measurement provided immediate penetration results directly comparable to the real time penetrations of methyl iodide. These penetrations were compared for typical charcoal adsorbents with these impregnants: (a) 5% KI/sub 3/, (b) 5% KI/sub 3/ + 2% TEDA, (c) 5% TEDA, and (d) metal salts (Whetlerite). Differences between CH/sub 3/I and CH/sub 3//sup 131/I penetrations observed for the two iodized charcoals were attributed to isotope exchange reactions. Equivalent penetrations were observed for non-iodized adsorbents and for iodized ones at initial time. First order rates were confirmed for reactions with TEDA and for isotope exchange. This was one more confirmation of the lack of a challenge concentration effect on efficiencies at low test bed loadings. In addition to other removal mechanisms, reversible physical adsorption was observed with all charcoals.

Wood, G.O.; Valdez, F.O.

1980-01-01T23:59:59.000Z

137

HPGe Detector Efficiency Calibration Using HEU Standards  

SciTech Connect

The Analytical Development Section of SRTC was requested by the Facilities Disposition Division (FDD) to determine the holdup of enriched uranium in the 321-M facility as part of an overall deactivation project of the facility. The 321-M facility was used to fabricate enriched uranium fuel assemblies, lithium-aluminum target tubes, neptunium assemblies, and miscellaneous components for the production reactors. The facility also includes the 324-M storage building and the passageway connecting it to 321-M. The results of the holdup assays are essential for determining compliance with the Solid Waste's Waste Acceptance Criteria, Material Control and Accountability, and to meet criticality safety controls. Two measurement systems will be used to determine highly enriched uranium (HEU) holdup: One is a portable HPGe detector and EG and G Dart system that contains high voltage power supply and signal processing electronics. A personal computer with Gamma-Vision software was used to provide an MCA card, and space to store and manipulate multiple 4096-channel g-ray spectra. The other is a 2 inches x 2 inches NaI crystal with an MCA that uses a portable computer with a Canberra NaI plus card installed. This card converts the PC to a full function MCA and contains the ancillary electronics, high voltage power supply and amplifier, required for data acquisition. This report describes and documents the HPGe point, line, area, and constant geometry-constant transmission detector efficiency calibrations acquired and calculated for use in conducting holdup measurements as part of the overall deactivation project of building 321-M.

Salaymeh, S.R.

2000-10-12T23:59:59.000Z

138

Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Monitoring of the Airport Calibration Pads at Walker Field, Grand Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) More Documents & Publications Field Calibration Facilities for Environmental Measurement of Radium, Thorium, and Potassium (October 2013) Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report

139

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

New Data Stream Available from Millimeter Wave Cloud Radar New Data Stream Available from Millimeter Wave Cloud Radar Bookmark and Share Inside the instrument shelter, the MMCR data system collects radar spectral data and processes these into reflectivity, vertical velocities, and spectral width. Inside the instrument shelter, the MMCR data system collects radar spectral data and processes these into reflectivity, vertical velocities, and spectral width. As a result of upgrades to the Millimeter Wave Cloud Radar (MMCR) processors (see http://www.arm.gov/acrf/updates051504.stm#nsammcr) at the ARM Climate Research Facility Southern Great Plains (SGP) and North Slope of Alaska (NSA) locales, two MMCR data streams-mmcrcalC1.a1 (calibration data) and mmcrmomentsC1.a1 (spectral "moments" data)-have been combined

140

Mercury Continuous Emmission Monitor Calibration  

SciTech Connect

Mercury continuous emissions monitoring systems (CEMs) are being implemented in over 800 coal-fired power plant stacks throughput the U.S. Western Research Institute (WRI) is working closely with the Electric Power Research Institute (EPRI), the National Institute of Standards and Technology (NIST), and the Environmental Protection Agency (EPA) to facilitate the development of the experimental criteria for a NIST traceability protocol for dynamic elemental mercury vapor calibrators/generators. These devices are used to calibrate mercury CEMs at power plant sites. The Clean Air Mercury Rule (CAMR) which was published in the Federal Register on May 18, 2005 and vacated by a Federal appeals court in early 2008 required that calibration be performed with NIST-traceable standards. Despite the vacature, mercury emissions regulations in the future will require NIST traceable calibration standards, and EPA does not want to interrupt the effort towards developing NIST traceability protocols. The traceability procedures will be defined by EPA. An initial draft traceability protocol was issued by EPA in May 2007 for comment. In August 2007, EPA issued a conceptual interim traceability protocol for elemental mercury calibrators. The protocol is based on the actual analysis of the output of each calibration unit at several concentration levels ranging initially from about 2-40 {micro}g/m{sup 3} elemental mercury, and in the future down to 0.2 {micro}g/m{sup 3}, and this analysis will be directly traceable to analyses by NIST. The EPA traceability protocol document is divided into two separate sections. The first deals with the qualification of calibrator models by the vendors for use in mercury CEM calibration. The second describes the procedure that the vendors must use to certify the calibrators that meet the qualification specifications. The NIST traceable certification is performance based, traceable to analysis using isotope dilution inductively coupled plasma/mass spectrometry (ID/ICP/MS) performed by NIST in Gaithersburg, MD. The outputs of mercury calibrators are compared to one another using a nesting procedure which allows direct comparison of one calibrator with another at specific concentrations and eliminates analyzer variability effects. The qualification portion of the EPA interim traceability protocol requires the vendors to define calibrator performance as affected by variables such as pressure, temperature, line voltage, and shipping. In 2007 WRI developed and conducted a series of simplified qualification experiments to determine actual calibrator performance related to the variables defined in the qualification portion of the interim protocol.

John Schabron; Eric Kalberer; Ryan Boysen; William Schuster; Joseph Rovani

2009-03-12T23:59:59.000Z

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Calibration of Radiances from Space  

Science Conference Proceedings (OSTI)

The authors compare the performance of broadband radiometers with spectrally dispersed measurements. Spectrally dispersed radiometers may be more accurately calibrated than is possible with broadband filter instruments. They also have a larger ...

Richard Goody; Robert Haskins

1998-04-01T23:59:59.000Z

142

Radar Calibration: Some Simple Approaches  

Science Conference Proceedings (OSTI)

The proper calibration of weather radars has been at the heart of the problem of accurate reflectivity measurements for more than five decades. This paper summarizes a number of methods that have been used previously and others that areworthy of ...

David Atlas

2002-09-01T23:59:59.000Z

143

IES Calibration and Mapping Procedures  

Science Conference Proceedings (OSTI)

The procedures used in the Synoptic Ocean Prediction experiment for calibration of inverted echo sounder (IES) travel time ? data have led to substantially improved accuracy. In previous work, ? was converted to main thermocline depth ZT using ...

Karen L. Tracey; Stephan D. Howden; D. Randolph Watts

1997-12-01T23:59:59.000Z

144

Direct radiometric observations of the water vapor greenhouse effect over the equatorial Pacific ocean  

SciTech Connect

Airborne radiometric measurements were used to determine tropospheric profiles of the clear sky greenhouse effect. At sea surface temperatures (SSTs) larger than 300 kelvin, the clear sky water vapor greenhouse effect was found to increase with SST at a rate of 13 to 15 watts per square meter per kelvin. Satellite measurements of infrared radiances and SSTs indicate that almost 52 percent of the tropical oceans between 20{degrees}N and 20{degrees}S are affected during all seasons. Current general circulation models suggest that the increase in the clear sky water vapor greenhouse effect with SST may have climatic effects on a planetary scale. 23 refs., 5 figs., 1 tab.

Valero, F.P.J.; Collins, W.D.; Bucholtz, A. [Univ. of California, La Jolla, CA (United States)] [and others

1997-03-21T23:59:59.000Z

145

ARM - Site Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

PlainsInstruments PlainsInstruments SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts Instruments : Southern Great Plains [ Single installation ] ACSM Aerosol Chemical Speciation Monitor Aerosols Browse Data [ Installed at 5 facilities ] AERI Atmospheric Emitted Radiance Interferometer Radiometric Browse Plots Browse Data [ Single installation ] AOS Aerosol Observing System Aerosols Browse Plots Browse Data [ Single installation ] BRS Broadband Radiometer Station Radiometric Browse Plots Browse Data [ Single installation ] BSRN Baseline Solar Radiation Network

146

Recombinant fluorescent protein microsphere calibration standard  

SciTech Connect

A method for making recombinant fluorescent protein standard particles for calibration of fluorescence instruments.

Nolan, John P. (Santa Fe, NM); Nolan, Rhiannon L. (Santa Fe, NM); Ruscetti, Teresa (Los Alamos, NM); Lehnert, Bruce E. (Los Alamos, NM)

2001-01-01T23:59:59.000Z

147

Calibration of Digital Amateur Cameras  

E-Print Network (OSTI)

We introduce a novel outlook on the self-calibration task, by considering images taken by a camera in motion, allowing for zooming and focusing. Apart from the complex relationship between the lens control settings and the intrinsic camera parameters, a prior off-line calibration allows to neglect the setting of focus, and to fix the principal point and aspect ratio throughout distinct views. Thus, the calibration matrix is dependent only on the zoom position. Given a fully calibrated reference view, one has only one parameter to estimate for any other view of the same scene, in order to calibrate it and to be able to perform metric reconstructions. We provide a close-form solution, and validate the reliability of the algorithm with experiments on real images. An important advantage of our method is a reduced - to one - number of critical camera configurations, associated with it. Moreover, we propose a method for computing the epipolar geometry of two views, taken from different positions and with different (spatial) resolutions; the idea is to take an appropriate third view, that is "easy" to match with the other two.

Magdalena Urbanek; Magdalena Urbanek; Radu Horaud; Radu Horaud; Peter Sturm; Peter Sturm; Projet Movi

2001-01-01T23:59:59.000Z

148

Theoretical basis for extrapolation of calibration data of PTC 6 throat tap nozzles  

SciTech Connect

Equations for the extrapolation of calibration data for ASME/PTC 6 throat tap nozzles are derived from boundary layer theory. Results match published coefficients with a maximum difference of +0.03 per cent. It is also shown that the effects of transition in the boundary layer extend to throat Reynolds numbers in excess of 10,000,000, far beyond the capacity of any known calibration laboratory. The present PTC 6 requirement that calibration data must be in the fully-turbulent range cannot be met with current facilities.

Keyser, D.R. (Naval Air Development Center, Warminster, PA (USA)); Murdock, J.W. (Drexel Univ., Philadelphia, PA (USA))

1990-01-01T23:59:59.000Z

149

High Exposure Facility Technical Description  

Science Conference Proceedings (OSTI)

The High Exposure Facility is a collimated high-level gamma irradiator that is located in the basement of the 318 building. It was custom developed by PNNL back in 1982 to meet the needs for high range radiological instrument calibrations and dosimeter irradiations. At the time no commercially available product existed that could create exposure rates up to 20,000 R/h. This document is intended to pass on the design criteria that was employed to create this unique facility, while maintaining compliance with ANSI N543-1974, "General Safety Standard for Installations Using Non-Medical X-Ray and Sealed Gamma-Ray Sources, Energies up to 10 MeV."

Carter, Gregory L.; Stithem, Arthur R.; Murphy, Mark K.; Smith, Alex K.

2008-02-12T23:59:59.000Z

150

Self-calibrating multiplexer circuit  

DOE Patents (OSTI)

A time domain multiplexer system with automatic determination of acceptable multiplexer output limits, error determination, or correction is comprised of a time domain multiplexer, a computer, a constant current source capable of at least three distinct current levels, and two series resistances employed for calibration and testing. A two point linear calibration curve defining acceptable multiplexer voltage limits may be defined by the computer by determining the voltage output of the multiplexer to very accurately known input signals developed from predetermined current levels across the series resistances. Drift in the multiplexer may be detected by the computer when the output voltage limits, expected during normal operation, are exceeded, or the relationship defined by the calibration curve is invalidated.

Wahl, C.P.

1995-12-31T23:59:59.000Z

151

Self-calibrating multiplexer circuit  

DOE Patents (OSTI)

A time domain multiplexer system with automatic determination of acceptable multiplexer output limits, error determination, or correction is comprised of a time domain multiplexer, a computer, a constant current source capable of at least three distinct current levels, and two series resistances employed for calibration and testing. A two point linear calibration curve defining acceptable multiplexer voltage limits may be defined by the computer by determining the voltage output of the multiplexer to very accurately known input signals developed from predetermined current levels across the series resistances. Drift in the multiplexer may be detected by the computer when the output voltage limits, expected during normal operation, are exceeded, or the relationship defined by the calibration curve is invalidated.

Wahl, Chris P. (North Huntingdon, PA)

1997-01-01T23:59:59.000Z

152

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2004 Facility News ARM Climate Research Facility Achieves User Milestone Three Months Ahead of Schedule Bookmark and Share Summary of the ARM Climate Research Facility User...

153

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 15, 2008 Facility News Future of User Facility Discussed at Fall Workshop As a national user facility, ARM is accessible to scientists around the globe for...

154

Method for calibrating mass spectrometers  

DOE Patents (OSTI)

A method whereby a mass spectra generated by a mass spectrometer is calibrated by shifting the parameters used by the spectrometer to assign masses to the spectra in a manner which reconciles the signal of ions within the spectra having equal mass but differing charge states, or by reconciling ions having known differences in mass to relative values consistent with those known differences. In this manner, the mass spectrometer is calibrated without the need for standards while allowing the generation of a highly accurate mass spectra by the instrument.

Anderson, Gordon A [Benton City, WA; Brands, Michael D [Richland, WA; Bruce, James E [Schwenksville, PA; Pasa-Tolic, Ljiljana [Richland, WA; Smith, Richard D [Richland, WA

2002-12-24T23:59:59.000Z

155

Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature from  

E-Print Network (OSTI)

Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction108, Aiken, SC, USA ABSTRACT Determining the internal temperature of a mechanical draft cooling tower is to estimate the temperature of the air exiting a mechanical draft cooling tower (MDCT) through the use

Salvaggio, Carl

156

Research Facilities and Programs  

Science Conference Proceedings (OSTI)

WEB RESOURCES: Magnesium Research Facilities and Programs ... to universities, corporations, and other facilities involved in magnesium research, 0, 1025...

157

Californium Neutron Irradiation Facility  

Science Conference Proceedings (OSTI)

Californium Neutron Irradiation Facility. Summary: ... Cf irradiation facility (Photograph by: Neutron Physics Group). Lead Organizational Unit: pml. Staff: ...

2013-07-23T23:59:59.000Z

158

Mobile Solar Tracker Facility  

Science Conference Proceedings (OSTI)

Mobile Solar Tracker Facility. ... NIST's mobile solar tracking facility is used to characterize the electrical performance of photovoltaic panels. ...

2011-11-15T23:59:59.000Z

159

Evaluatoni of Automated Utility Bill Calibration Methods  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Evaluation of Automated Utility Bill Calibration Methods BA Technical Update Meeting Ben Polly, Joe Robertson 04/30/13 Utility Bill Calibration * "Calibrate" or "true-up" building energy models to utility bill data to increase the accuracy of retrofit savings predictions * Calibration methods typically involve adjusting input parameters * Predict retrofit savings using the adjusted (calibrated) model 2 Background: BESTEST-EX * BESTEST-EX is a suite for testing calibration methods and retrofit savings predictions associated with audit software * Field trials showed that:

160

Facility Representatives  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE-STD-1063-2006 April 2006 Superseding DOE-STD-1063-2000 March 2000 DOE STANDARD FACILITY REPRESENTATIVES U.S. Department of Energy AREA MGMT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-1063-2006 ii Available on the Department of Energy Technical Standards Program web site at http://www.eh.doe.gov/techstds/ DOE-STD-1063-2006 iii FOREWORD 1. This Department of Energy standard is approved for use by all DOE Components. 2. The revision to this DOE standard was developed by a working group consisting of headquarters and field participants. Beneficial comments (recommendations, additions, deletions) and any pertinent data that may improve this document should

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Facility Type!  

Office of Legacy Management (LM)

ITY: ITY: --&L~ ----------- srct-r~ -----------~------~------- if yee, date contacted ------------- cl Facility Type! i I 0 Theoretical Studies Cl Sample 84 Analysis ] Production 1 Diepasal/Storage 'YPE OF CONTRACT .--------------- 1 Prime J Subcontract&- 1 Purchase Order rl i '1 ! Other information (i.e., ---------~---~--~-------- :ontrait/Pirchaee Order # , I C -qXlJ- --~-------~~-------~~~~~~ I I ~~~---~~~~~~~T~~~ FONTRACTING PERIODi IWNERSHIP: ,I 1 AECIMED AECMED GOVT GOUT &NTtiAC+OR GUN-I OWNED ----- LEEE!? M!s LE!Ps2 -LdJG?- ---L .ANDS ILJILDINGS X2UIPilENT IRE OR RAW HA-I-L :INAL PRODUCT IASTE Z. RESIDUE I I kility l pt I ,-- 7- ,+- &!d,, ' IN&"E~:EW AT SITE -' ---------------- , . Control 0 AEC/tlED managed operations

162

Facility Representatives  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

063-2011 063-2011 February 2011 Superseding DOE-STD-1063-2006 April 2006 DOE STANDARD FACILITY REPRESENTATIVES U.S. Department of Energy AREA MGMT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-1063-2011 ii Available on the Department of Energy Technical Standards Program Web site at http://www.hss.doe.gov/nuclearsafety/ns/techstds/ DOE-STD-1063-2011 iii FOREWORD 1. This Department of Energy (DOE) standard is approved for use by all DOE/National Nuclear Security Administration (NNSA) Components. 2. The revision to this DOE standard was developed by a working group consisting of headquarters and field participants. Beneficial comments (recommendations,

163

Research Facility,  

NLE Websites -- All DOE Office Websites (Extended Search)

Collecting and Delivering the Data Collecting and Delivering the Data As a general condition for use of the ARM Climate Research Facility, users are required to include their data in the ARM Data Archive. All data acquired must be of sufficient quality to be useful and must be documented such that users will be able to clearly understand the meaning and organization of the data. Final, quality-assured data sets are stored in the Data Archive and are freely accessible to the general scientific community. Preliminary data may be shared among field campaign participants during and shortly following the campaign. To facilitate sharing of preliminary data, the ARM Data Archive establishes restricted access capability, limited to participants and data managers.

164

Facility automation for retail facilities  

Science Conference Proceedings (OSTI)

This article will focus on retail chain stores with areas of 22,000 to 75,000 sq ft, but much of the article will apply to all retail stores independent of size. Typically, a store is serviced by 5 to 15 rooftop HVAC units with a total cooling capacity of 50 to 150 tons, depending on the floor area and geographic location. The interior lighting represents a load of 80 to 300 KW with three lighting levels--retail, stocking, and security or night. Most stores are located in strip centers, and therefore, the parking lot lighting is provided by the landlord, but each store does control and service its own sign lighting. Generally, the total load controlled by an FAS represents 130 to 450 KW with corresponding annual energy costs ranging from $65,000 to $200,000 (natural gas and electricity), depending on the size of the store and the local unit costs of energy. Historical utility data, electrical and mechanical drawings, site surveys, significant analyses of data, and most importantly, discussions with corporate facilities management personnel and store operations personnel provide the source for the development theory and sequence of operation of the design of the facility automation systems for retail stores. The three main goals of an FAS are: reduce utility operating costs, maintain comfort levels during occupied hours, reduce HVAC maintenance costs.

Ameduri, G. (Roth Bros., Inc., Youngstown, OH (United States). Facilities Automation Division)

1994-12-01T23:59:59.000Z

165

Calibrating Cylindrical Hot-Film Anemometer Sensors  

Science Conference Proceedings (OSTI)

We report the results of 82 separate calibrations of cylindrical, platinum hot-film anemometer sensors in air. The calibrations for each sensor involved a determination of its temperature-resistance characteristics, a study of its heat transfer ...

Edgar L. Andreas; Brett Murphy

1986-06-01T23:59:59.000Z

166

Low-Temperature Calibration of Infrared Thermometers  

Science Conference Proceedings (OSTI)

A method was developed for calibrating infrared thermometers to properly measure target temperatures ranging from ?70 to 0C. Once calibrated for this range, the thermometer can then be used to measure the flux of thermal radiation from the sky. ...

B. A. Kimball; S. T. Mitchell

1984-12-01T23:59:59.000Z

167

Logging Calibration Models for Fission Neutron Sondes (September...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Logging Calibration Models for Fission Neutron Sondes (September 1981) Logging Calibration Models for Fission Neutron Sondes (September 1981) Logging Calibration Models for Fission...

168

Spinning angle optical calibration apparatus  

DOE Patents (OSTI)

An optical calibration apparatus is provided for calibrating and reproducing spinning angles in cross-polarization, nuclear magnetic resonance spectroscopy. An illuminated magnifying apparatus enables optical setting an accurate reproducing of spinning "magic angles" in cross-polarization, nuclear magnetic resonance spectroscopy experiments. A reference mark scribed on an edge of a spinning angle test sample holder is illuminated by a light source and viewed through a magnifying scope. When the "magic angle" of a sample material used as a standard is attained by varying the angular position of the sample holder, the coordinate position of the reference mark relative to a graduation or graduations on a reticle in the magnifying scope is noted. Thereafter, the spinning "magic angle" of a test material having similar nuclear properties to the standard is attained by returning the sample holder back to the originally noted coordinate position.

Beer, Stephen K. (Morgantown, WV); Pratt, II, Harold R. (Morgantown, WV)

1991-01-01T23:59:59.000Z

169

Spinning angle optical calibration apparatus  

DOE Patents (OSTI)

An optical calibration apparatus is provided for calibrating and reproducing spinning angles in cross-polarization, nuclear magnetic resonance spectroscopy. An illuminated magnifying apparatus enables optical setting and accurate reproducing of spinning magic angles in cross-polarization, nuclear magnetic resonance spectroscopy experiments. A reference mark scribed on an edge of a spinning angle test sample holder is illuminated by a light source and viewed through a magnifying scope. When the magic angle of a sample material used as a standard is attained by varying the angular position of the sample holder, the coordinate position of the reference mark relative to a graduation or graduations on a reticle in the magnifying scope is noted. Thereafter, the spinning magic angle of a test material having similar nuclear properties to the standard is attained by returning the sample holder back to the originally noted coordinate position. 2 figs.

Beer, S.K.; Pratt, H.R. II.

1989-09-12T23:59:59.000Z

170

Harrisburg Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Harrisburg Facility Biomass Facility Harrisburg Facility Biomass Facility Jump to: navigation, search Name Harrisburg Facility Biomass Facility Facility Harrisburg Facility Sector Biomass Facility Type Landfill Gas Location Dauphin County, Pennsylvania Coordinates 40.2734277°, -76.7336521° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.2734277,"lon":-76.7336521,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

171

Brookhaven Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Brookhaven Facility Biomass Facility Brookhaven Facility Biomass Facility Jump to: navigation, search Name Brookhaven Facility Biomass Facility Facility Brookhaven Facility Sector Biomass Facility Type Landfill Gas Location Suffolk County, New York Coordinates 40.9848784°, -72.6151169° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.9848784,"lon":-72.6151169,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

172

Multidetector calibration for mass spectrometers  

SciTech Connect

The International Atomic Energy Agency`s Safeguards Analytical Laboratory has performed calibration experiments to measure the different efficiencies among multi-Faraday detectors for a Finnigan-MAT 261 mass spectrometer. Two types of calibration experiments were performed: (1) peak-shift experiments and (2) peak-jump experiments. For peak-shift experiments, the ion intensities were measured for all isotopes of an element in different Faraday detectors. Repeated measurements were made by shifting the isotopes to various Faraday detectors. Two different peak-shifting schemes were used to measure plutonium (UK Pu5/92138) samples. For peak-jump experiments, ion intensities were measured in a reference Faraday detector for a single isotope and compared with those measured in the other Faraday detectors. Repeated measurements were made by switching back-and-forth between the reference Faraday detector and a selected Faraday detector. This switching procedure is repeated for all Faraday detectors. Peak-jump experiments were performed with replicate measurements of {sup 239}Pu, {sup 187}Re, and {sup 238}U. Detector efficiency factors were estimated for both peak-jump and peak-shift experiments using a flexible calibration model to statistically analyze both types of multidetector calibration experiments. Calculated detector efficiency factors were shown to depend on both the material analyzed and the experimental conditions. A single detector efficiency factor is not recommended for each detector that would be used to correct routine sample analyses. An alternative three-run peak-shift sample analysis should be considered. A statistical analysis of the data from this peak-shift experiment can adjust the isotopic ratio estimates for detector differences due to each sample analysis.

Bayne, C.K. [Oak Ridge National Lab., TN (United States); Donohue, D.L.; Fiedler, R. [IAEA, Seibersdorf (Austria). Safeguards Analytical Lab.

1994-06-01T23:59:59.000Z

173

Calibration  

Science Conference Proceedings (OSTI)

... Typical inductance standards are relatively robust and therefore do not require ... 2.6.8.3 If the measurement type does not match the terminal ... 1981. ...

2011-09-21T23:59:59.000Z

174

Calibration of erythemally weighted broadband instruments: A comparison between PMOD/WRC and MSL  

Science Conference Proceedings (OSTI)

A Yankee Environmental Systems (YES) UVB-1 ultraviolet pyranometer, designed to measure erythemally weighted total solar irradiance, was calibrated by the Measurement Standards Laboratory (MSL) in Lower Hutt, New Zealand during August 2010. The calibration was then repeated during July and August 2011 by the Physikalisch-Meteorologisches Obervatorium Davos, World Radiation Center (PMOD/WRC) located in Davos, Switzerland. Calibration results show that measurements of the relative spectral and angular response functions at the two institutes are in excellent agreement, thus providing a good degree of confidence in these measurement facilities. However, measurements to convert the relative spectral response into an absolute calibration disagree significantly depending on whether an FEL lamp or solar spectra are used to perform this scaling. This is the first serious comparison of these scaling methods to formally explore the potential systematic errors which could explain the discrepancy.

Swift, Neil; Nield, Kathryn; Hamlin, John [Measurement Standards Laboratory of New Zealand, Industrial Research Ltd, Lower Hutt (New Zealand); Huelsen, Gregor; Groebner, Julian [Physikalisch-Meteorologisches Observatorium Davos, World Radiation Centre, Davos Dorf (Switzerland)

2013-05-10T23:59:59.000Z

175

Calibration of NRSF2 Instrument at HFIR  

SciTech Connect

The Neutron Residual Stress Mapping Facility (NRSF2) at HB-2B is a new generation-diffraction instrument, adding many new Second Generation features, such as larger beam tube, large sample XYZ goniometer, and KAPPA orienter for a broad range of materials behavior studies. One key feature is the NRSF2 monochromator, which is a double focusing, double crystal monochromator system consisting of two sets of stacked Si crystal wafers. One set of wafers has Si[400] plane normal to the surface while the other set of wafers has the Si[500] normal to the surface. The monochromator crystal diffracts at a fixed diffraction angle of 88{sup o} selecting a neutron wavelength determined by the monochromator d{sub hkl}-spacing. This 'Missouri' monochromator system has two independent monochromators, which enable diffraction from the following set of six diffraction planes: Si(511), Si(422), Si(331)AF (Anti-Fankuchen geometry), Si(400), Si(311), and Si(220). These diffraction planes can provide 6 different neutron wavelengths: approximately 1.45, 1.54, 1.73, 1.89 {angstrom}, 2.27, and 2.66 also incorporate seven position sensitive detectors located in a detector shield box. To use this advanced instrument for scientific and engineering measurements, careful calibration needs to be performed to accurately calibrate the seven position sensitive detectors, neutron wavelength, and 2{theta}{sub 0}. Just as in the X-ray diffraction technique, neutron diffraction directly measures the diffraction angle (2{theta}) or diffraction peak position, then based on Bragg's law and a strain free lattice spacing, the strain can be calculated. Therefore anything that can affect the diffracting angle measurement can influence the accuracy of the strain measurements. The sources of difficulties in achieving accurate neutron diffraction peak positions can be classified into three categories. (1) Instrument - These difficulties come from alignment of the monochromator, alignment of the incident and detector slits, leveling of the sample table, 2{theta}{sub 0} offset, and response of the position sensitive detector; (2) Counting statistics - if the peak profile count is too low, then the peak position derived from fitting a profile and background will have larger error. Therefore, adequate counting statistics and well-defined peaks are always good for precise peak position determination; and (3) Sample - Large grain size materials make it difficult to get enough diffracting grains, contributing to the different profile. With a low number the peak becomes 'spot' and results in inaccuracy in peak position. Texture in the sample can change the effective elastic constants and also affect the peak intensity. Phase and composition inhomogeneity can make it difficult to determine an accurate stress-free d{sub 0} for strain calculation. A partially buried gauge volume due to proximity to the sample surface or buried interface can also shift the peak position. The calibration method presented in this report will address the first two categories of difficulties listed above. The FWHM can be minimized for each sample d-spacing by adjusting the horizontal bending of the monochromator crystal. For the monochromator, the optimum FWHM lies between 70 and 110 degree. This range is selected in order to maintain an approximately equiaxed gauge volume and avoid significant increases in peak breadth for the detectors above and below the horizontal plane. To adequately calibrate the position sensitive detectors, 2{theta}{sub 0}, and wavelength, a set of high purity reference powders were selected. Since the selected reference powders have define grain size is, the measurement errors from sample grain size and texture can be excluded, although there may still be micro-strain in the powders, which can broaden the reference peak. In this report, the calibration procedure for the NRSF2 instrument will be presented and calibration results for five monochromator settings from HFIR cycle 403 will be presented. The monochromator settings calibrated include Si(331)AF (Anti-Fankuche n geomet

Tang, Fei [ORNL; Hubbard, Camden R [ORNL

2006-08-01T23:59:59.000Z

176

Spatially Distributed Sensible Heat Flux over a Semiarid Watershed. Part II: Use of a Variable Resistance Approach with Radiometric Surface Temperatures  

Science Conference Proceedings (OSTI)

Radiometric surface temperature images from aircraft observations over the Walnut Gulch Experimental Watershed, a semiarid rangeland watershed, were used with ground-based meteorological data at a reference site for extrapolating estimates of ...

William P. Kustas; Karen S. Humes

1997-04-01T23:59:59.000Z

177

Analysis of Radiosonde and Ground-Based Remotely Sensed PWV Data from the 2004 North Slope of Alaska Arctic Winter Radiometric Experiment  

Science Conference Proceedings (OSTI)

During 9 March9 April 2004, the North Slope of Alaska Arctic Winter Radiometric Experiment was conducted at the Atmospheric Radiation Measurement Programs (ARM) Great White field site near Barrow, Alaska. The major goals of the experiment ...

V. Mattioli; E. R. Westwater; D. Cimini; J. C. Liljegren; B. M. Lesht; S. I. Gutman; F. J. Schmidlin

2007-03-01T23:59:59.000Z

178

Spatially Distributed Sensible Heat Flux over a Semiarid Watershed. Part I: Use of Radiometric Surface Temperatures and a Spatially Uniform Resistance  

Science Conference Proceedings (OSTI)

Spatially distributed radiometric surface temperatures over a semiarid watershed were computed using remotely sensed data acquired with an aircraft-based multispectral scanner during the Monsoon 90 Large Scale Field Experiment. The multispectral ...

K. S. Humes; W. P. Kustas; D. C. Goodrich

1997-04-01T23:59:59.000Z

179

International Facility Management Association Strategic Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Management Association Facility Management Association Strategic Facility Planning: A WhIte PAPer Strategic Facility Planning: A White Paper on Strategic Facility Planning © 2009 | International Facility Management Association For additional information, contact: 1 e. Greenway Plaza, Suite 1100 houston, tX 77046-0104 USA P: + 1-713-623-4362 F: + 1-713-623-6124 www.ifma.org taBle OF cOntentS PreFace ......................................................... 2 executive Summary .................................... 3 Overview ....................................................... 4 DeFinitiOn OF Strategic Facility Planning within the Overall cOntext OF Facility Planning ................. 5 SPecializeD analySeS ................................ 9 OrganizatiOnal aPPrOacheS tO SFP ... 10 the SFP PrOceSS .......................................

180

Office of Nuclear Facility Basis & Facility Design  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Nuclear Safety Basis & Facility Design(HS-31) Reports to the Office of Nuclear Safety About Us The Office of Nuclear Safety Basis & Facility Design establishes safety...

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

LRM probe-tip calibrations using nonideal standards ...  

Science Conference Proceedings (OSTI)

... The dashed curve corresponds to repeated calibrations with identical ... LRRM calibrations with automatic determination of load inductance, 36th ...

2013-07-11T23:59:59.000Z

182

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

than any other quarter on record-961 The U.S. Department of Energy requires national user facilities to report facility use by total visitor days and facility to track actual...

183

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility News Data Collection from Mobile Facility on Gan Island Suspended Local weather balloon launch volunteers pose with the AMF team on Gan Island after completing their...

184

from Isotope Production Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Cancer-fighting treatment gets boost from Isotope Production Facility April 13, 2012 Isotope Production Facility produces cancer-fighting actinium - 2 - 2:32 Isotope cancer...

185

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

approximately 22,500 square kilometers, or the approximate area of a modern climate model grid cell. Centered around the SGP Central Facility, these extended facilities are...

186

Chemistry Dept. Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Facilities As a research organization within a National Laboratory, the Chemistry Department operates research facilities that are available to other researchers as...

187

Facility Safeguardability Assessment Report  

National Nuclear Security Administration (NNSA)

of the Facility Safeguardability Analysis (FSA) Process RA Bari SJ Johnson J Hockert R Wigeland EF Wonder MD Zentner August 2012 PNNL- 21698 Overview of the Facility...

188

Facility Safeguardability Assessment Report  

National Nuclear Security Administration (NNSA)

facilities or research facilities that involve previously unused processes or technologies, comparison with previously required safeguard design features may not be...

189

Fuel Fabrication Facility  

National Nuclear Security Administration (NNSA)

Construction of the Mixed Oxide Fuel Fabrication Facility Construction of the Mixed Oxide Fuel Fabrication Facility November 2005 May 2007 June 2008 May 2012...

190

User Facility Agreement Form  

NLE Websites -- All DOE Office Websites (Extended Search)

5. Which Argonne user facility will be hosting you? * Advanced Leadership Computing Facility (ALCF) Advanced Photon Source (APS) Argonne Tandem Linear...

191

NREL: Biomass Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities At NREL's state-of-the-art biomass research facilities, researchers design and optimize processes to convert renewable biomass feedstocks into transportation fuels and...

192

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2008 Facility News National User Facility Organization Meets to Discuss Progress and Ideas In late April, the ARM Technical Director attended an annual meeting of the...

193

Oak Ridge Reservation Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

processed for shipment to the Nevada Test Site or other appropriate disposal facility. Molten Salt Reactor Experiment Facility The Molten Salt Reactor Experiment (MSRE) operated...

194

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 15, 2008 Facility News ARM Mobile Facility Completes Field Campaign in Germany Researchers will study severe precipitation events that occurred in August and October...

195

Facility Representative Program: 2003 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

3 Facility Representative Workshop 3 Facility Representative Workshop May 13 - 15, 2003 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Day 1: Tuesday, May 13, 2003 Theme: Program Successes and Challenges 8:00 a.m. John Evans, Facility Representative Program Manager 8:15 a.m. Welcome Kathleen Carlson Manager, Nevada Site Office 8:30 a.m. Keynote Address Savannah River Site and Facility Reps - A Shared History and Common Future Jeffrey M. Allison Manager, Savannah River Operations Office 9:00 a.m. Videotaped Remarks from the Deputy Secretary Kyle E. McSlarrow, Deputy Secretary of Energy 9:10 a.m. Facility Representative of the Year Presentation Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board

196

NREL: Research Facilities - Test and User Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and User Facilities Test and User Facilities NREL has test and user facilities available to industry and other organizations for researching, developing, and evaluating renewable energy and energy efficiency technologies. Here you'll find an alphabetical listing and brief descriptions of NREL's test and user facilities. A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z A Advanced Research Turbines At our wind testing facilities, we have turbines available to test new control schemes and equipment for reducing loads on wind turbine components. Learn more about the Advanced Research Turbines on our Wind Research website. Back to Top D Distributed Energy Resources Test Facility This facility was designed to assist the distributed power industry in the

197

Facility Representative Program: 2000 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

0 Facility Representative Workshop 0 Facility Representative Workshop May 16-18, 2000 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Tuesday, May 16, 2000 Theme for Day 1: Sustaining the Success of the Facility Representative Program 8:00 a.m. - Opening Remarks - Joe Arango, Facility Representative Program Manager 8:05 a.m. - Welcome - Kenneth Powers, Deputy Manager Nevada Operations Office 8:15 a.m. - Deputy Secretary Remarks - T. J. Glauthier, Deputy Secretary of Energy 8:30 a.m. - Keynote Address - Jerry Lyle, Assistant Manager for Environmental Management, Idaho Operations Office 9:00 a.m. - Facility Representative of the Year Presentation - Mark B. Whitaker, Departmental Representative 9:30 a.m. - Break 9:50 a.m. - Program Results and Goals - Joe Arango, Facility Representative Program Manager

198

Guide to research facilities  

SciTech Connect

This Guide provides information on facilities at US Department of Energy (DOE) and other government laboratories that focus on research and development of energy efficiency and renewable energy technologies. These laboratories have opened these facilities to outside users within the scientific community to encourage cooperation between the laboratories and the private sector. The Guide features two types of facilities: designated user facilities and other research facilities. Designated user facilities are one-of-a-kind DOE facilities that are staffed by personnel with unparalleled expertise and that contain sophisticated equipment. Other research facilities are facilities at DOE and other government laboratories that provide sophisticated equipment, testing areas, or processes that may not be available at private facilities. Each facility listing includes the name and phone number of someone you can call for more information.

Not Available

1993-06-01T23:59:59.000Z

199

1987 calibration of the TFTR neutron spectrometers  

SciTech Connect

The {sup 3}He neutron spectrometer used for measuring ion temperatures and the NE213 proton recoil spectrometer used for triton burnup measurements were absolutely calibrated with DT and DD neutron generators placed inside the TFTR vacuum vessel. The details of the detector response and calibration are presented. Comparisons are made to the neutron source strengths measured from other calibrated systems. 23 refs., 19 figs., 6 tabs.

Barnes, C.W.; Strachan, J.D. (Los Alamos National Lab., NM (USA); Princeton Univ., NJ (USA). Plasma Physics Lab.)

1989-12-01T23:59:59.000Z

200

Facilities/Staff Hydrogen  

Science Conference Proceedings (OSTI)

Thermophysical Properties of Hydrogen. FACILITIES and STAFF. The Thermophysical Properties Division is the Nation's ...

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Sloan Digital Sky Survey Photometric Calibration Revisited  

SciTech Connect

The Sloan Digital Sky Survey calibration is revisited to obtain the most accurate photometric calibration. A small but significant error is found in the flat-fielding of the Photometric telescope used for calibration. Two SDSS star catalogs are compared and the average difference in magnitude as a function of right ascension and declination exhibits small systematic errors in relative calibration. The photometric transformation from the SDSS Photometric Telescope to the 2.5 m telescope is recomputed and compared to synthetic magnitudes computed from measured filter bandpasses.

Marriner, John; /Fermilab

2012-06-29T23:59:59.000Z

202

Fluid Metrology Calibration Services - Air Speed  

Science Conference Proceedings (OSTI)

... National Institute of Standards and Technology provides calibration services for air speed instrumentation such as Pitot tubes, hot-wire or thermal ...

2013-02-11T23:59:59.000Z

203

Silicon Micromachined Dimensional Calibration Artifact for Mesoscale...  

NLE Websites -- All DOE Office Websites (Extended Search)

Not only are we offering improved accuracy and lower cost, but we are also enabling 3D and multisensor calibration. How this Product Improves upon Competitive Products or...

204

Calibrations of Electronic Brachytherapy Sources, Traceable ...  

Science Conference Proceedings (OSTI)

... As in traditional brachytherapy, the source is placed ... established to provide calibrations of these sources. ... through use of a primary-standard free-air ...

2010-10-05T23:59:59.000Z

205

Instrument calibration using the pneumatic deadweight tester  

SciTech Connect

One of the most difficult problems facing the instrument engineer is the accurate calibration of orifice meters, particularly at remote or inaccessible locations. The object of this paper is to describe a unique solution to this problem, an automatic pneumatic deadweight tester utilizing the floating ball principle. The Ametek Model PK Pneumatic Deadweight Tester is an ideal instrument to use for the calibration of orifice meters. This instrument provides unexcelled accuracy combined with reliable operation and ease of use for both field and laboratory calibration. It has been accepted by most of the gas transmission companies as a pressure standard for meter calibration.

Johnson, E.R.

1984-04-01T23:59:59.000Z

206

Facility Representative Program: 2001 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Facility Representative Workshop 1 Facility Representative Workshop May 15 - 17, 2001 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Day 1: Tuesday, May 15, 2001 Theme: Program Successes and Challenges 8:00 a.m. - Logistics Announcements & Opening Remarks - Joe Arango, Facility Representative Program Manager 8:15 a.m. - Welcome - Debbie Monette, Assistant Manager for National Security, Nevada Operations Office 8:30 a.m. - Keynote Address - Ralph Erickson, National Nuclear Security Administration 9:00 a.m.- DOE Facility Representative of the Year Presentation - Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board 9:30 a.m. - Break 9:50 a.m. - Program Summary - Joe Arango 10:10 a.m. - Management Panel/Questions and Answers

207

Facility Representative Program: 2010 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

10 Facility Representative Workshop 10 Facility Representative Workshop May 12 - 13, 2010 Las Vegas, NV Facility Rep of the Year Award | Attendees | Summary Report Workshop Agenda and Presentations Day 1: Wednesday, May 12, 2010 8:00 a.m. Opening Remarks James Heffner, Facility Representative Program Manager Earl Hughes, Safety System Oversight Program Manager Office of Nuclear Safety Policy and Assistance Office of Health, Safety and Security 8:15 a.m. Welcome from the Nevada Site Office John Mallin, Deputy Assistant Manager for Site Operations Nevada Site Office 8:30 a.m. Workshop Keynote Address Todd Lapointe Chief of Nuclear Safety Central Technical Authority Staff 9:15 a.m. Facility Representative and Safety System Oversight Award Ceremony James Heffner, Facility Representative Program Manager

208

Facility Representative Program: 2007 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

7 Facility Representative Workshop 7 Facility Representative Workshop May 15 - 17, 2007 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final Day 1: Tuesday, May 15, 2007 8:00 a.m. Opening Remarks Joanne Lorence, Facility Representative Program Manager 8:15 a.m. Welcome from the Nevada Site Office Gerald Talbot, Manager, Nevada Site Office 8:30 a.m. Videotaped Remarks from the Deputy Secretary The Honorable Clay Sell, Deputy Secretary of Energy 8:45 a.m. Keynote Address - Safety Oversight Perspective and Expectations Glenn Podonsky, Chief Health, Safety and Security Officer, Office of Health, Safety and Security 9:10 a.m. Facility Representative of the Year Presentation Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board,

209

Gearbox Reliability Collaborative Bearing Calibration  

DOE Green Energy (OSTI)

NREL has initiated the Gearbox Reliability Collaborative (GRC) to investigate the root cause of the low wind turbine gearbox reliability. The GRC follows a multi-pronged approach based on a collaborative of manufacturers, owners, researchers and consultants. The project combines analysis, field testing, dynamometer testing, condition monitoring, and the development and population of a gearbox failure database. At the core of the project are two 750kW gearboxes that have been redesigned and rebuilt so that they are representative of the multi-megawatt gearbox topology currently used in the industry. These gearboxes are heavily instrumented and are tested in the field and on the dynamometer. This report discusses the bearing calibrations of the gearboxes.

van Dam, J.

2011-10-01T23:59:59.000Z

210

Facility Representative Program: 2008 Facility Representative...  

NLE Websites -- All DOE Office Websites (Extended Search)

Sherman Chao, LSO Conduct of Operations Improvements at K Basins Dennis Humphreys, RL Molten Salt Reactor Experiment (MSRE) facility lessons learned Charlie Wright, ORO...

211

Facility Representative Program: 2005 Facility Representative...  

NLE Websites -- All DOE Office Websites (Extended Search)

Sharing of Good Practices and Lessons Learned (4) Inadvertent Startup of Electric Centrifuge at the Weapon Evaluation Test Lab Joyce Arviso-Benally, SSO Facility Rep...

212

Facility Representative Program: 2012 Facility Representative...  

NLE Websites -- All DOE Office Websites (Extended Search)

18, 2012 Las Vegas, NV Agenda | Presentations | SSO Annual Award | Pictures | Summary Report 2011 Facility Representative of the Year Award 2011 WINNER: Congratulations to Bradley...

213

Guidelines for Instrument Calibration Extension/Reduction -- Revision 1: Statistical Analysis of Instrument Calibration Data  

Science Conference Proceedings (OSTI)

Calibration reduction or fuel cycle extension efforts require an analysis of plant-specific instrument performance to demonstrate that the longer calibration interval will not result in larger than expected drift. This manual provides a methodology and guidelines for evaluating historical calibration data, and addresses technical issues associated with the application of the analysis results.

1998-10-30T23:59:59.000Z

214

Balance Calibration A Method for Assigning a Direct-Reading Uncertainty to an Electronic Balance.  

SciTech Connect

Paper Title: Balance Calibration A method for assigning a direct-reading uncertainty to an electronic balance. Intended Audience: Those who calibrate or use electronic balances. Abstract: As a calibration facility, we provide on-site (at the customers location) calibrations of electronic balances for customers within our company. In our experience, most of our customers are not using their balance as a comparator, but simply putting an unknown quantity on the balance and reading the displayed mass value. Manufacturers specifications for balances typically include specifications such as readability, repeatability, linearity, and sensitivity temperature drift, but what does this all mean when the balance user simply reads the displayed mass value and accepts the reading as the true value? This paper discusses a method for assigning a direct-reading uncertainty to a balance based upon the observed calibration data and the environment where the balance is being used. The method requires input from the customer regarding the environment where the balance is used and encourages discussion with the customer regarding sources of uncertainty and possible means for improvement; the calibration process becomes an educational opportunity for the balance user as well as calibration personnel. This paper will cover the uncertainty analysis applied to the calibration weights used for the field calibration of balances; the uncertainty is calculated over the range of environmental conditions typically encountered in the field and the resulting range of air density. The temperature stability in the area of the balance is discussed with the customer and the temperature range over which the balance calibration is valid is decided upon; the decision is based upon the uncertainty needs of the customer and the desired rigor in monitoring by the customer. Once the environmental limitations are decided, the calibration is performed and the measurement data is entered into a custom spreadsheet. The spreadsheet uses measurement results, along with the manufacturers specifications, to assign a direct-read measurement uncertainty to the balance. The fact that the assigned uncertainty is a best-case uncertainty is discussed with the customer; the assigned uncertainty contains no allowance for contributions associated with the unknown weighing sample, such as density, static charges, magnetism, etc. The attendee will learn uncertainty considerations associated with balance calibrations along with one method for assigning an uncertainty to a balance used for non-comparison measurements.

Mike Stears

2010-07-01T23:59:59.000Z

215

NREL: Photovoltaics Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities NREL's world-class research facilities provide the venue for innovative advances in photovoltaic technologies and applications. These facilities within the National Center for Photovoltaics (NCPV) serve both multi-use and dedicated-use functions. We encourage our research colleagues in industry, universities, and other laboratories to pursue opportunities in working with our staff in these facilities. Dedicated-Use Facilities Photo of a red-hot coil glowing inside a round machine. Research within these facilities focuses on targeted areas of interest that require specific tools, techniques, or unique capabilities. Our two main dedicated-use facilities are the following: Outdoor Test Facility (OTF) OTF researchers study and evaluate advanced or emerging PV technologies

216

Brief Calibration and estimation of redundant signals  

Science Conference Proceedings (OSTI)

This paper presents formulation and validation of an adaptive filter for real-time calibration of redundant signals consisting of sensor data and/or analytically derived measurements. The measurement noise covariance matrix is adjusted as a function ... Keywords: Adaptive filtering, Real-time control, Redundancy management, Sensor calibration, Signal estimation

Asok Ray; Shashi Phoha

2000-10-01T23:59:59.000Z

217

Application of evolutionary algorithms for model calibration  

Science Conference Proceedings (OSTI)

Calibration of plant specific parameters of a process-based plant model can represent a considerable challenge when observed data are available from multiple environments. Calibration of model parameters can be considered as a search for the optimal ... Keywords: EA-SA, evolutionary optimization, ragweed, self-adaptation, sirius

Mikhail A. Semenov; Pierre Stratonowitch

2012-07-01T23:59:59.000Z

218

Using reforecasts for probabilistic forecast calibration  

E-Print Network (OSTI)

1 Using reforecasts for probabilistic forecast calibration Tom Hamill NOAA Earth System Research that is currently operational. #12;3 Why compute reforecasts? · For many forecast problems, such as long-lead forecasts or high-precipitation events, a few past forecasts may be insufficient for calibrating

Hamill, Tom

219

(1) Ensemble forecast calibration & (2) using reforecasts  

E-Print Network (OSTI)

1 (1) Ensemble forecast calibration & (2) using reforecasts Tom Hamill NOAA Earth System Research · Calibration: ; the statistical adjustment of the (ensemble) forecast ­ Rationale 1: Infer large-sample probabilities from small ensemble. ­ Rationale 2: Remove bias, increase forecast reliability while preserving

Hamill, Tom

220

A New RR Lyrae Metallicity Calibration  

E-Print Network (OSTI)

We have begun developing a new metallicity calibration for RR Lyrae stars that includes high-temperature phase regions. Our calibration is an updated and expanded version of the Delta-S, equivalent width method, but which is applicable for most phases of the pulsation, and for the hotter, shorter-period RRc stars. This calibration will be constructed from spectral observations of well studied, bright RR Lyrae stars with metallicities from published high-resolution studies, within the range $-2.5 < [Fe/H] < -0.3$. Phase information for our calibration stars were taken from the AAVSO website, and the MacAdam Student Observatory at the University of Kentucky. Low-resolution spectroscopy $(R \\sim 1000)$ was obtained using the McDonald Observatory, 2.1 meter telescope. Here we present our preliminary data, and find the phase region where the calibration will break down.

Spalding, E; De Lee, N

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Facility Representative Program: Facility Representative Program Sponsors  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Representative Program Sponsors Facility Representative Program Sponsors There are 29 Facility Representative Program Sponsors Office Name Title E-Mail Phone ASO Larry Pendexter ES&H Div Dir (Argonne) larry.pendexter@ch.doe.gov 630-252-1485 BHSO Bob Desmarais Operations Management Division Director desmarai@bnl.gov 631-344-5434 CBFO Glenn Gamlin Facility Representative Supervisor glenn.gamlin@wipp.ws 575-234-8136 CBFO Casey Gadbury Operations Manager casey.gadbury@wipp.ws 575-234-7372 FSO Mark Bollinger Deputy Manager Mark.Bollinger@ch.doe.gov 630-840-8130 FSO John Scott FR Team Lead john.scott@ch.doe.gov 630-840-2250 HS-30 James O'Brien Director, Office of Nuclear Safety James.O'Brien@hq.doe.gov 301-903-1408 HS-32 Earl Hughes Facility Representative Program Manager Earl.Hughes@hq.doe.gov 202-586-0065

222

User Facilities | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

USER PORTAL USER PORTAL BTRICBuilding Technologies Research Integration Center CNMSCenter for Nanophase Materials Sciences CSMBCenter for Structural Molecular Biology CFTFCarbon Fiber Technology Facility HFIRHigh Flux Isotope Reactor MDF Manufacturing Demonstration Facility NTRCNational Transportation Research Center OLCFOak Ridge Leadership Computing Facility SNSSpallation Neutron Source Keeping it fresh at the Spallation Neutron Source Nanophase material sciences' nanotech toolbox Home | User Facilities SHARE ORNL User Facilities ORNL is home to a number of highly sophisticated experimental user facilities that provide unmatched capabilities to the broader scientific community, including a growing user community from universities, industry, and other laboratories research institutions, as well as to ORNL

223

EETD Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

7 7 The Bidirectional Radiometric Scanner Liliana Beltran and Konstantinos Papamichael (Building Technologies Program) prepare a sample for testing in the scanning radiometer. Saving energy in buildings is increasingly a matter of balancing different efficiency strategies. A building uses less cooling energy during the summer when it has specially coated windows that reduce solar heat gain. But a building with increased daylighting and lighting controls uses less lighting energy throughout the year, suggesting that buildings can harvest significant energy savings with windows that transmit most of their incident visible light. During the winter, solar heat gain through windows also contributes to maintaining a comfortable indoor temperature. But the amount of energy that gets through is determined by the effect of the

224

MOISTURE MONITOR TESTING AND CALIBRATION  

SciTech Connect

ABS>Electrolytic moisture monitors which continuously analyze the moisture content of gases are commercially available. After a period of operation, these instruments may give erroneous readings, frequently because of damage to the electrolytic cell. A gas with a known and reproducible moisture content within the operating range would be useful for making operational response tests on these monltors and for checking their calibration. A paired- hydrate system of a chemical compound exhibits a water vapor pressure that is constant at a constant temperature. ff an unreactive gas is allowed to equilibrate with a paired-hydrate system, the moisture content of the gas is determined by the vapor pressure of the hydrate pair, the total pressure, and the temperature. Hydrated magnesium perchlorate was prepared which contained between four and six moles of water per mole of perchlorate. This material was pulverized lightly then packed into a stainless steel column and 100 cc/minute of air at atmospheric pressure was passed through the bed. The exit air from the column was analyzed with a moisture monitor. A gas residence time of two minutes in the column was found to be sufficient for establishing moisture equilibrium in the exit flow. The moisture content of the exit air was found to vary from 34 to 70 ppm by volume as the temperature of the paired-hydrate system varied from 20 to 28 un. Concent 85% C. Other paired-hydrate systems can extend this range to higher moisture levels. (auth)

Montgomery, C.D.; Googin, J.M.; Phillips, L.R.

1963-03-14T23:59:59.000Z

225

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

A new corner reflector (too small to be seen in this photo) on the WACR calibration tower helped to correct problems related to signal interference. A new corner reflector (too...

226

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 15, 2005 [Facility News] October 15, 2005 [Facility News] Room to Share-New Guest Facility Ready for Users at North Slope of Alaska Bookmark and Share In September, installation was completed on the new Guest Instrument Facility in Barrow to provide additional space and ease crowded conditions. In September, installation was completed on the new Guest Instrument Facility in Barrow to provide additional space and ease crowded conditions. To alleviate crowded conditions at its research facilities on the North Slope of Alaska (NSA) site in Barrow, ARM operations staff recently completed the installation of a new Guest Instrument Facility. Similar to the platform at the Atqasuk site, the facility consists of two insulated shipping containers mounted on pilings, with a mezzanine to accommodate

227

NREL: Wind Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Our facilities are designed to meet the wind industry's critical research needs with state-of-the-art design and testing facilities. NREL's unique and highly versatile facilities at the National Wind Technology Center offer research and analysis of wind turbine components and prototypes rated from 400 watts to 3 megawatts. Satellite facilities support the growth of wind energy development across the United States. National Wind Technology Center Facilities Our facilities are contained within a 305-acre area that comprises field test sites, test laboratories, industrial high-bay work areas, machine shops, electronics and instrumentation laboratories, and office areas. In addition, there are hundreds of test articles and supporting components such as turbines, meteorological towers, custom test apparatus, test sheds,

228

FACET User Facility  

NLE Websites -- All DOE Office Websites

AD SLACPortal > Accelerator Research Division > FACET User Facility AD SLACPortal > Accelerator Research Division > FACET User Facility Sign In Launch the Developer Dashboard SLAC National Accelerator Laboratory DOE | Stanford | SLAC | SSRL | LCLS | AD | PPA | Photon Science | PULSE | SIMES FACET User Facility : FACET An Office of Science User Facility Search this site... Search Help (new window) Top Link Bar FACET User Facility FACET Home About FACET FACET Experimental Facilities FACET Users Research at FACET SAREC Expand SAREC FACET FAQs FACET User Facility Quick Launch FACET Users Home FACET Division ARD Home About FACET FACET News FACET Users FACET Experimental Facilities FACET Research Expand FACET Research FACET Images Expand FACET Images SAREC Expand SAREC FACET Project Site (restricted) FACET FAQs FACET Site TOC All Site Content

229

Government Facilities Segment Analysis  

Science Conference Proceedings (OSTI)

Federal, state, and local governments own or lease an estimated 1.2 million buildings and facilities in the United States. These facilities are an important -- and often overlooked -- customer segment for all energy and energy service providers.

1998-12-19T23:59:59.000Z

230

Geothermal component test facility  

DOE Green Energy (OSTI)

A description is given of the East Mesa geothermal facility and the services provided. The facility provides for testing various types of geothermal energy-conversion equipment and materials under field conditions using geothermal fluids from three existing wells. (LBS)

Not Available

1976-04-01T23:59:59.000Z

231

Supercomputing | Facilities | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Primary Systems Infrastructure High Performance Storage Supercomputing and Computation Home | Science & Discovery | Supercomputing and Computation | Facilities and Capabilities...

232

Idaho Site Nuclear Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Nuclear Facilities Idaho Idaho National Laboratorys (INL) Idaho Closure Project (ICP) This page was last updated on May 16...

233

MML Microscopy Facility  

Science Conference Proceedings (OSTI)

The MML Electron Microscopy Facility consists of three transmission electron microscopes (TEM), three scanning electron microscopes (SEM), a ...

2013-06-11T23:59:59.000Z

234

Photon Sciences | Navigation | Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities NSLS About NSLS Accelerator Activity Report Experimental Systems Machine Status & History Operations & Engineering Operating Schedules Ring Parameters NSLS Ops:...

235

Facilities and Instruments  

Science Conference Proceedings (OSTI)

... The EL Facilities listed here are available for cooperative or independent research, typically on a cost reimbursable basis. ...

2013-03-12T23:59:59.000Z

236

Numerical and experimental calibration of calorimetric sample cell dedicated to nuclear heating measurements  

SciTech Connect

Online nuclear measurements inside experimental channels of MTRs are needed for experimental works (to design set-ups) and for numerical works (input data) in order to better understanding complex phenomena occurring during the accelerated ageing of materials and the irradiation of nuclear fuel. In this paper we focus only on one kind of measurements: nuclear heating performed by means of a radiometric calorimeter. The aims of numerical and experimental works are firstly to optimize the sensor response for new energy deposit ranges and then to miniaturize this sensor for JHR irradiation conditions A first calorimeter, developed previously by the CEA, is studied. It corresponds to a graphite differential calorimeter divided into two twin cells (a reference cell, and a sample one). It is used with a non adiabatic mode or heat flow mode. Experimental calibration of the sample cell is presented. In that case, energy deposit is simulated by Joule effect and the sample cell is inserted into a bath at a regulated temperature and controlled flow. The response of the sensor is shown versus electrical power imposed for two flow regimes (intensive or moderated forced convection). These experimental results are compared to numerical works and improvements are discussed. (authors)

Brun, J.; Reynard, C.; Merroun, O. [Chemistry Laboratory of Provence LCP UMR 6264 - Universite de Provence, Centre St. Jerome, Bat. Madirel, 13397 Marseille Cedex 20 (France); Lyoussi, A. [French Alternatives Energies and Atomic Energy Commission CEA, Direction de l'Energie Nucleaire DEN, Centre de Cadarache, 13108 Saint-Paul-Lez-Durance (France); Carette, M.; Janulyte, A.; Zerega, Y.; Andre, J. [Chemistry Laboratory of Provence LCP UMR 6264 - Universite de Provence, Centre St. Jerome, Bat. Madirel, 13397 Marseille Cedex 20 (France); Bignan, G.; Chauvin, J. P.; Fourmentel, D.; Gonnier, C.; Guimbal, P.; Malo, J. Y.; Villard, J. F. [French Alternatives Energies and Atomic Energy Commission CEA, Direction de l'Energie Nucleaire DEN, Centre de Cadarache, 13108 Saint-Paul-Lez-Durance (France)

2011-07-01T23:59:59.000Z

237

Successful remediation of four uranium calibration pits at Technical Area II, Sandia National Laboratories, Albuquerque, New Mexico, USA  

Science Conference Proceedings (OSTI)

The first remediation of an Environmental Restoration (ER) Project site at Sandia National Laboratories (SNL) was successfully conducted in May and June 1994 at Technical Area II. The removal action involved four Uranium Calibration Pits (UCPs) filled with radioactive or hazardous materials. The concrete culvert pits were used to test and calibrate borehole radiometric logging tools for uranium exploration. The removal action consisted of excavating and containerizing the pit contents and contaminated soil beneath the culverts, removing the four culverts, and backfilling the excavation. Each UCP removal had unique complexities. Sixty 208-L drums of solid radioactive waste and eight 208-L drums of liquid hazardous waste were generated during the VCM. Two of the concrete culverts will be disposed as radioactive waste and two as solid waste. Uranium-238 was detected in UCP-2 ore material at 746 pci/g, and at 59 pci/g in UCP-1 silica sand. UCP-4 was empty; sludge from UCP-3 contained 122 mg/L (ppm) chromium.

Conway, R. [Sandia National Labs., Albuquerque, NM (United States); Wade, M. [INTERA, Inc., Albuquerque, NM (United States); Tharp, T. [Weston (Roy F.), Inc., Albuquerque, NM (United States); Copland, J. [Science Applications International Corp., Albuquerque, NM (United States)

1994-12-31T23:59:59.000Z

238

Facility Representative Program: 2004 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

4 Facility Representative Workshop 4 Facility Representative Workshop May 18 - 20, 2004 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final Day 1: Tuesday, May 18, 2004 Theme: Program Successes and Challenges 8:00 a.m. Opening Remarks John Evans, Facility Representative Program Manager 8:15 a.m. Welcome Kathy Carlson, Nevada Site Office Manager 8:30 a.m. Videotaped Remarks from the Deputy Secretary Kyle E. McSlarrow, Deputy Secretary of Energy Deputy Secretary's Remarks 8:40 a.m. Keynote Address - NNSA Evaluation of Columbia Accident Investigation Board Report Brigadier General Ronald J. Haeckel, Principal Assistant Deputy Administrator for Military Applications, NNSA Other Information: NASA’S Columbia Accident Investigation Board Report

239

Facility Representative Program: 2006 Facility Representative Workshop  

NLE Websites -- All DOE Office Websites (Extended Search)

6 Facility Representative Workshop 6 Facility Representative Workshop May 16 - 19, 2006 Knoxville, Tennessee Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final To view Pictures, scroll the mouse over the Picture icon To view Presentations, Picture Slideshows and Video, click on the icon Day 1: Tuesday, May 16, 2006 8:00 a.m. Opening Remarks John Evans, Facility Representative Program Manager 8:15 a.m. Welcome from Oak Ridge Office Gerald Boyd, Manager, Oak Ridge Office 8:25 a.m. Welcome from Y-12 Site Office Theodore Sherry, Manager, Y-12 Site Office 8:35 a.m. Videotaped Remarks from the Deputy Secretary The Honorable Clay Sell, Deputy Secretary of Energy 8:40 a.m. Keynote Address - Safety Oversight at Environmental Management Activities Dr. Inés Triay, Chief Operating Officer, Office of Environmental Management

240

Facility Representative Program: 2000 Facility Representative...  

NLE Websites -- All DOE Office Websites (Extended Search)

- Break 10:00 a.m. - Making Your Observations CountLeading Indicators - Mike Weis, Rocky Flats Field Office 10:45 a.m. - Facility Representative PanelQuestions and Answers (Ben...

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

NREL: Buildings Research - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities NREL provides industry, government, and university researchers with access to state-of-the-art and unique equipment for analyzing a wide spectrum of building energy efficiency technologies and innovations. NREL engineers and researchers work closely with industry partners to research and develop advanced technologies. NREL's existing facilities have been used to test and develop many award-winning building technologies and innovations that deliver significant energy savings in buildings, and the new facilities further extend those capabilities. In addition, the NREL campus includes living laboratories, buildings that researchers and other NREL staff use every day. Researchers monitor real-time building performance data in these facilities to study energy use

242

Calibrating X-ray Imaging Devices for Accurate Intensity Measurement  

SciTech Connect

The purpose of the project presented is to develop methods to accurately calibrate X-ray imaging devices. The approach was to develop X-ray source systems suitable for this endeavor and to develop methods to calibrate solid state detectors to measure source intensity. NSTec X-ray sources used for the absolute calibration of cameras are described, as well as the method of calibrating the source by calibrating the detectors. The work resulted in calibration measurements for several types of X-ray cameras. X-ray camera calibration measured efficiency and efficiency variation over the CCD. Camera types calibrated include: CCD, CID, back thinned (back illuminated), front illuminated.

Haugh, M. J.

2011-07-28T23:59:59.000Z

243

Calibration of the Ogawa ozone passive sampler for aircraft cabins...  

NLE Websites -- All DOE Office Websites (Extended Search)

Calibration of the Ogawa ozone passive sampler for aircraft cabins. Title Calibration of the Ogawa ozone passive sampler for aircraft cabins. Publication Type Journal Article Year...

244

NIST: Calibration of Low-Energy Photon Brachytherapy ...  

Science Conference Proceedings (OSTI)

Calibration of Low-Energy Photon Brachytherapy Sources. ... yields a calibration coefficient for the well-ionization chamber for a given seed type. ...

2013-02-27T23:59:59.000Z

245

Groundwater model calibration at Pantex using Data Fusion modeling  

SciTech Connect

The Pantex plant has operated as one of the Federal government`s key conventional and nuclear weapons facilities since the 1940`s. In recent years, the DOE has expended considerable effort to characterize the nature and extent of groundwater contamination associated with the site. That effort is still on-going with the ultimate aim of determining and implementing appropriate remedial measures. The goal of the study described in this report was to use Data Fusion modeling to calibrate a groundwater model near Zone 12 of Pantex, primarily to define the potential pathways to the Ogallala aquifer. Data Fusion is a new approach for combining different but interrelated types of information from multiple sources into a quantitative analysis of system characteristics and dynamic behavior. The Data Fusion Workstation (DFW) is a patented technique for carrying out Data Fusion analyses using specially developed computer based approaches. The technique results in the development of a calibrated model of a site consistent with the data, first principles, and geostatistical spatial continuity. A more explicit description of the Data Fusion concept and approach is presented.

NONE

1996-04-01T23:59:59.000Z

246

Biomass Anaerobic Digestion Facilities and Biomass Gasification...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Biomass Anaerobic Digestion Facilities and Biomass Gasification Facilities (Indiana) Biomass Anaerobic Digestion Facilities and Biomass Gasification Facilities (Indiana)...

247

Facility Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser  

Open Energy Info (EERE)

Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser Place GeneratingCapacity NumberOfUnits CommercialOnlineDate WindTurbineManufacturer FacilityStatus Coordinates D Metals D Metals D Metals Definition Small Scale Wind Valley City OH MW Northern Power Systems In Service AB Tehachapi Wind Farm AB Tehachapi Wind Farm AB Tehachapi Definition Commercial Scale Wind Coram Energy AB Energy Southern California Edison Co Tehachapi CA MW Vestas In Service AFCEE MMR Turbines AFCEE MMR Turbines AFCEE MMR Turbines Definition Commercial Scale Wind AFCEE Air Force Center for Engineering and the Environment Distributed generation net metered Camp Edwards Sandwich MA MW GE Energy In Service AG Land AG Land AG Land Definition Community Wind AG Land Energy LLC

248

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 22, 2007 [Facility News] March 22, 2007 [Facility News] GEWEX News Features Dust Data from ARM Mobile Facility Deployment Bookmark and Share Data from the recent deployment of the ARM Mobile Facility are featured in the February issue of GEWEX News. Data from the recent deployment of the ARM Mobile Facility are featured in the February issue of GEWEX News. The February 2007 issue (Vol. 17, No. 1) of GEWEX News features early results from special observing periods of the African Monsoon Mutidisciplinary Analysis, including data obtained by the ARM Mobile Facility (AMF). The AMF was stationed in the central Sahel from January through December 2006, with the primary facility at the Niamey airport, and an ancillary site in Banizoumbou. The AMF recorded a major dust storm that passed through the area in March, and combined with simultaneous satellite

249

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

February 16, 2005 [Facility News] February 16, 2005 [Facility News] Mobile Facility Arrives Safe and Sound in Point Reyes Bookmark and Share Image - The ARM Mobile Facility in Point Reyes, California Image - The ARM Mobile Facility in Point Reyes, California Safe and sound at Point Reyes, the ARM Mobile Facility instrumentation is set up on the roof of a shelter until a fence is installed to keep out the curious local cattle. On February 9, the ARM Mobile Facility (AMF) withstood an accident on the way to its deployment location at Point Reyes, California. About an hour from its destination, the truck carrying the two AMF shelters packed with instrumentation and associated equipment swerved to avoid another vehicle and slid off the road and down a steep embankment. Emergency personnel soon

250

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

22, 2011 [Facility News] 22, 2011 [Facility News] Request for Proposals Now Open Bookmark and Share The ARM Climate Research Facility is now accepting applications for use of an ARM mobile facility (AMF), the ARM aerial facility (AAF), and fixed sites. Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Facility, with availability as follows: AMF2 available December 2013 AMF1 available March 2015 AAF available between June and October 2013 Fixed sites available FY2013 Priority will be given to proposals that make comprehensive use of the ARM facilities and focus on long-term goals of the DOE Office of Biological and Environmental Research. Successful proposals will be supplied all operational and logistical resources (provided at no cost to the principal

251

AUTOMATIC CALIBRATING SYSTEM FOR PRESSURE TRANSDUCERS  

DOE Patents (OSTI)

An automatic system for calibrating a number of pressure transducers is described. The disclosed embodiment of the invention uses a mercurial manometer to measure the air pressure applied to the transducer. A servo system follows the top of the mercury column as the pressure is changed and operates an analog- to-digital converter This converter furnishes electrical pulses, each representing an increment of pressure change, to a reversible counterThe transducer furnishes a signal at each calibration point, causing an electric typewriter and a card-punch machine to record the pressure at the instant as indicated by the counter. Another counter keeps track of the calibration points so that a number identifying each point is recorded with the corresponding pressure. A special relay control system controls the pressure trend and programs the sequential calibration of several transducers.

Amonette, E.L.; Rodgers, G.W.

1958-01-01T23:59:59.000Z

252

Vicarious Calibration of the Meteosat Visible Channel  

Science Conference Proceedings (OSTI)

Postlaunch calibration of the Meteosat visible (VIS) channel has been performed with Meteosat-1, Meteosat-2, and Meteosat-4. The radiance at the satellite radiometer aperture has been determined by independent means and has been related to the ...

Karl-Theodor Kriebel; Volker Amann

1993-04-01T23:59:59.000Z

253

Update of Radiance Calibrations for ISCCP  

Science Conference Proceedings (OSTI)

Since July 1983 ISCCP has collected, normalized, and calibrated radiance data (visible and thermal infrared) from the imaging radiometers on the National Oceanic and Atmospheric Administration polar orbiters and from the geostationary satellites ...

Christopher L. Brest; William B. Rossow; Miriam D. Roiter

1997-10-01T23:59:59.000Z

254

Flow through electrode with automated calibration  

DOE Patents (OSTI)

The present invention is an improved automated flow through electrode liquid monitoring system. The automated system has a sample inlet to a sample pump, a sample outlet from the sample pump to at least one flow through electrode with a waste port. At least one computer controls the sample pump and records data from the at least one flow through electrode for a liquid sample. The improvement relies upon (a) at least one source of a calibration sample connected to (b) an injection valve connected to said sample outlet and connected to said source, said injection valve further connected to said at least one flow through electrode, wherein said injection valve is controlled by said computer to select between said liquid sample or said calibration sample. Advantages include improved accuracy because of more frequent calibrations, no additional labor for calibration, no need to remove the flow through electrode(s), and minimal interruption of sampling.

Szecsody, James E [Richland, WA; Williams, Mark D [Richland, WA; Vermeul, Vince R [Richland, WA

2002-08-20T23:59:59.000Z

255

Calibration Systems of the ATLAS Tile Calorimeter  

E-Print Network (OSTI)

TileCal is the hadronic calorimeter covering the most central region of the ATLAS experiment at the LHC. This sampling calorimeter uses iron plates as absorber and plastic scintillating tiles as the active material. A multi-faceted calibration system allows to monitor and equalize the calorimeter response at each stage of the signal production, from scintillation light to digitization. This calibration system is based on signal generation from different sources: a Cs radioactive source, laser light, charge injection and minimum bias events produced in proton-proton collisions. A brief description of the different TileCal calibration systems is given and the latest results on their performance in terms of calibration factors, linearity and stability are presented.

Olof Lundberg

2012-12-15T23:59:59.000Z

256

Multisource Self-calibration for Sensor Arrays  

E-Print Network (OSTI)

Calibration of a sensor array is more involved if the antennas have direction dependent gains and multiple calibrator sources are simultaneously present. We study this case for a sensor array with arbitrary geometry but identical elements, i.e. elements with the same direction dependent gain pattern. A weighted alternating least squares (WALS) algorithm is derived that iteratively solves for the direction independent complex gains of the array elements, their noise powers and their gains in the direction of the calibrator sources. An extension of the problem is the case where the apparent calibrator source locations are unknown, e.g., due to refractive propagation paths. For this case, the WALS method is supplemented with weighted subspace fitting (WSF) direction finding techniques. Using Monte Carlo simulations we demonstrate that both methods are asymptotically statistically efficient and converge within two iterations even in cases of low SNR.

Wijnholds, Stefan J; 10.1109/TSP.2009.2022894

2010-01-01T23:59:59.000Z

257

Calibration and Rating of Photovoltaics: Preprint  

SciTech Connect

Rating the performance of photovoltaic (PV) modules is critical to determining the cost per watt, and efficiency is useful to assess the relative progress among PV concepts. Procedures for determining the efficiency for PV technologies from 1-sun to low concentration to high concentration are discussed. We also discuss the state of the art in primary and secondary calibration of PV reference cells used by calibration laboratories around the world. Finally, we consider challenges to rating PV technologies and areas for improvement.

Emery, K.

2012-06-01T23:59:59.000Z

258

Waste Receiving and Processing (WRAP) Facility Weight Scale Analysis Fairbanks Weight Scale Evaluation Results  

SciTech Connect

Fairbanks Weight Scales are used at the Waste Receiving and Processing (WRAP) facility to determine the weight of waste drums as they are received, processed, and shipped. Due to recent problems, discovered during calibration, the WRAP Engineering Department has completed this document which outlines both the investigation of the infeed conveyor scale failure in September of 1999 and recommendations for calibration procedure modifications designed to correct deficiencies in the current procedures.

JOHNSON, M.D.

2000-03-13T23:59:59.000Z

259

Facilities Condition and Hazards Assessment for Materials and Fuel Complex Facilities MFC-799, 799A, and 770C  

Science Conference Proceedings (OSTI)

The Materials & Fuel Complex (MFC) facilities 799 Sodium Processing Facility (a single building consisting of two areas: the Sodium Process Area (SPA) and the Carbonate Process Area (CPA), 799A Caustic Storage Area, and 770C Nuclear Calibration Laboratory have been declared excess to future Department of Energy mission requirements. Transfer of these facilities from Nuclear Energy to Environmental Management, and an associated schedule for doing so, have been agreed upon by the two offices. The prerequisites for this transfer to occur are the removal of nonexcess materials and chemical inventory, deinventory of the calibration source in MFC-770C, and the rerouting and/or isolation of utility and service systems. This report provides a description of the current physical condition and any hazards (material, chemical, nuclear or occupational) that may be associated with past operations of these facilities. This information will document conditions at time of transfer of the facilities from Nuclear Energy to Environmental Management and serve as the basis for disposition planning. The process used in obtaining this information included document searches, interviews and facility walk-downs. A copy of the facility walk-down checklist is included in this report as Appendix A. MFC-799/799A/770C are all structurally sound and associated hazardous or potentially hazardous conditions are well defined and well understood. All installed equipment items (tanks, filters, etc.) used to process hazardous materials remain in place and appear to have maintained their integrity. There is no evidence of leakage and all openings are properly sealed or closed off and connections are sound. The pits appear clean with no evidence of cracking or deterioration that could lead to migration of contamination. Based upon the available information/documentation reviewed and the overall conditions observed during the facilities walk-down, it is concluded that these facilities may be disposed of at minimal risk to human health, safety or the environment.

Gary Mecham; Don Konoyer

2009-11-01T23:59:59.000Z

260

NREL: Technology Transfer - Research Facilities  

NREL's Solar Energy Research Facility is one of many world-class facilities available to public and private agencies.

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Quantum Electrical Metrology Division Facilities  

Science Conference Proceedings (OSTI)

Microfabrication Facility Our facilities for fabrication of integrated circuits are essential to nearly all of the work in the Group. ...

2011-10-03T23:59:59.000Z

262

Policies and Procedures - Accessing Facilities  

Science Conference Proceedings (OSTI)

... of Facilities Use Agreements: Description of the facilities use agreements ... Criteria: Guidance for applicants describing essential information about ...

2013-09-24T23:59:59.000Z

263

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2010 [Facility News] 8, 2010 [Facility News] Europeans Keen to Hear About Effects of Dust Using Data from Africa Bookmark and Share In 2006, the ARM Mobile Facility joined the AMMA project to obtain data for scientists to study the impact that airborne Saharan dust has on incoming solar radiation. This photo shows the sun setting through a dusty atmosphere near Niamey, Niger, where the mobile facility was deployed for one year. In 2006, the ARM Mobile Facility joined the AMMA project to obtain data for scientists to study the impact that airborne Saharan dust has on incoming solar radiation. This photo shows the sun setting through a dusty atmosphere near Niamey, Niger, where the mobile facility was deployed for one year. Researcher Xiaohong Liu from Pacific Northwest National Laboratory was

264

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2008 [Facility News] April 30, 2008 [Facility News] Team Scouts Graciosa Island for 2009 Mobile Facility Deployment Site Bookmark and Share A location near the airport on the northern end of Graciosa Island was identified as an excellent location for operating the ARM Mobile Facility. Image source: Luis Miguens A location near the airport on the northern end of Graciosa Island was identified as an excellent location for operating the ARM Mobile Facility. Image source: Luis Miguens Indications from a scouting trip by the ARM Mobile Facility (AMF) science and operations management team are that an excellent site for the 2009 deployment may have been found. From April 8 through April 16, the team traveled to Graciosa Island in the Azores to scout sites for the Clouds, Aerosol, and Precipitation in the Marine Boundary Layer (CAP-MBL) field

265

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 31, 2009 [Facility News] July 31, 2009 [Facility News] President of the Regional Government Speaks at Opening Ceremony for Mobile Facility in the Azores Bookmark and Share Highlighting the opening ceremony for the ARM Mobile Facility on Graciosa Island, Carlos César, President of the Regional Government of the Azores, signs a weather balloon while local media record the event. Photo by Mike Alsop. Highlighting the opening ceremony for the ARM Mobile Facility on Graciosa Island, Carlos César, President of the Regional Government of the Azores, signs a weather balloon while local media record the event. Photo by Mike Alsop. On June 30, officials from the Regional Government of the Azores recognized the deployment of the ARM Mobile Facility on Graciosa Island during an official opening ceremony held at the site. Notable among the participants

266

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2012 [Facility News] 6, 2012 [Facility News] News Tips from 2012 EGU General Assembly Bookmark and Share The ARM Facility is attending the 2012 European Geophysical Union General Assembly at the Austria Center in Vienna for the first time. The ARM Facility is attending the 2012 European Geophysical Union General Assembly at the Austria Center in Vienna for the first time. VIENNA - The U.S. Department of Energy's Atmospheric Radiation Measurement (ARM) Climate Research Facility is the world's most comprehensive outdoor laboratory and data archive for research related to atmospheric processes that affect Earth's climate. At the European Geophysical Union (EGU) General Assembly 2012 in Vienna, find out how scientists use the ARM Facility to study the interactions between clouds,

267

BNL | Accelerator Test Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerator Test Facility Accelerator Test Facility Home Core Capabilities Photoinjector S-Band Linac Laser Systems CO2 Laser Nd:Yag Laser Beamlines Beamline Simulation Data Beamline Parameters Beam Diagnostics Detectors Beam Schedule Operations Resources Fact Sheet (.pdf) Image Library Upgrade Proposal (.pdf) Publications ES&H Experiment Start-up ATF Handbook Laser Safety Collider-Accelerator Dept. C-AD ES&H Resources Staff Users' Place Apply for Access ATF photo ATF photo ATF photo ATF photo ATF photo A user facility for advanced accelerator research The Brookhaven Accelerator Test Facility (ATF) is a proposal driven, steering committee reviewed facility that provides users with high-brightness electron- and laser-beams. The ATF pioneered the concept of a user facility for studying complex properties of modern accelerators and

268

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

8, 2011 [Facility News, Publications] 8, 2011 [Facility News, Publications] Journal Special Issue Includes Mobile Facility Data from Germany Bookmark and Share The ARM Mobile Facility operated in Heselbach, Germany, as part of the COPS surface network. The ARM Mobile Facility operated in Heselbach, Germany, as part of the COPS surface network. In 2007, the ARM Mobile Facility participated in one of the most ambitious field studies ever conducted in Europe-the Convective and Orographically Induced Precipitation Study (COPS). Now, 21 papers published in a special issue of the Quarterly Journal of the Royal Meteorological Society demonstrate that the data collected during COPS are providing new insight into: the key chemical and physical processes leading to convection initiation and to the modification of precipitation by orography;

269

WIPP - Public Reading Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Public Reading Facilities/Electronic Reading Facilities The Freedom of Information Act (FOIA) and Electronic FOIA (E-FOIA) require that various specific types of records, as well as various other records, be maintained in public reading facilities. Before you submit a FOIA request, we recommend you contact or visit the appropriate public reading facility to determine if the records you are seeking have already been released. The U.S. Department of Energy (DOE), as well as other related DOE sites, have established home pages on the Internet with links to other web sites. If you determine a specific facility might have records in which you are interested, requests for those records can be made directly to the public reading rooms identified below. Copying of records located in the public reading rooms must be made by the staff of those facilities.

270

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2005 [Facility News] 15, 2005 [Facility News] Aging, Overworked Computer Network at SGP Gets Overhauled Bookmark and Share This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. Established as the first ARM research facility in 1992, the Southern Great Plains (SGP) site in Oklahoma is the "old man on the block" when it comes to infrastructure. Though significant improvements have been made to facilities and equipment throughout the years, the computer network at the

271

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 7, 2011 [Facility News] April 7, 2011 [Facility News] Review Panel States ARM Facility "Without Peer" Bookmark and Share Every three years, DOE Office of Science user facilities undergo a review to evaluate their effectiveness in contributing to their respective science areas. The latest ARM Facility review was conducted in mid-February by a six-member review panel led by Minghua Zhang of Stony Brook University. Notably, in a debriefing following the review, the panel stated that ARM was a "world class facility without peer." The panel convened in Ponca City, Oklahoma, near ARM's Southern Great Plains site to conduct their review. Their first agenda item was an SGP site tour, which provided a realtime example of the scope and expertise of site operations and included a demonstration of the site's newly

272

Integrated Facilities Disposition Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facilities Facilities Disposition Program Tank Waste Corporate Board Meeting at ORNL Sharon Robinson Dirk Van Hoesen Robert Jubin Brad Patton July 29, 2009 2 Managed by UT-Battelle for the U.S. Department of Energy The Integrated Facility Disposition Program (IFDP) addresses the remaining EM Scope at both ORNL and Y-12 Cost Range: $7 - $14B Schedule: 26 Years 3 Managed by UT-Battelle for the U.S. Department of Energy Scope of work * Treatment and disposition of legacy materials and waste * D&D 327 (1.5 M ft 2 ) excess facilities generating >2 M yd 3 debris * Soil and groundwater remedial actions generating >1 M yd 3 soils * Facilities surveillance and maintenance * Reconfiguration of waste management facilities * Ongoing waste management operations * Project management

273

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

4, 2013 [Facility News] 4, 2013 [Facility News] Work Cut Out for ARM Science Board Bookmark and Share With a new fixed site on the horizon in the Azores, a third ARM Mobile Facility gearing up for action in the Arctic, and more aircraft probes and sensors than scientists can shake a stick at, the ARM Facility continues to expand its considerable suite of assets for conducting climate research. Along with this impressive inventory comes the responsibility to ensure the Facility is supporting the highest-value science possible. Enter the ARM Science Board. This eleven-member group annually reviews complex proposals for use of the ARM mobile and aerial facilities. To maintain excellence and integrity in the review process, each member serves a renewable term of two years, with membership updated annually.

274

NREL: News Feature - New Test Facility to Improve Wind Turbines  

NLE Websites -- All DOE Office Websites (Extended Search)

Test Facility to Improve Wind Turbines Test Facility to Improve Wind Turbines December 26, 2013 Two men stand in front of the test equipment in the dynamometer facility discussing work being done. Behind them are two large blue machines that make up the dynamometer test apparatus. A white wind turbine nacelle system is attached to these devices to their left. Enlarge image NREL engineer Scott Lambert (left) and Project Manager Mark McDade discuss calibrations being done on the new dynamometer at the 5-MW Dynamometer Test Facility at NREL's National Wind Technology Center (NWTC). Credit: Dennis Schroeder Premature failures of mechanical systems have a significant impact on the cost of wind turbine operations and thus the total cost of wind energy. Recently, the Energy Department's National Renewable Energy Laboratory

275

TRIDENT high-energy-density facility experimental capabilities and diagnostics  

Science Conference Proceedings (OSTI)

The newly upgraded TRIDENT high-energy-density (HED) facility provides high-energy short-pulse laser-matter interactions with powers in excess of 200 TW and energies greater than 120 J. In addition, TRIDENT retains two long-pulse (nanoseconds to microseconds) beams that are available for simultaneous use in either the same experiment or a separate one. The facility's flexibility is enhanced by the presence of two separate target chambers with a third undergoing commissioning. This capability allows the experimental configuration to be optimized by choosing the chamber with the most advantageous geometry and features. The TRIDENT facility also provides a wide range of standard instruments including optical, x-ray, and particle diagnostics. In addition, one chamber has a 10 in. manipulator allowing OMEGA and National Ignition Facility (NIF) diagnostics to be prototyped and calibrated.

Batha, S. H.; Aragonez, R.; Archuleta, F. L.; Archuleta, T. N.; Benage, J. F.; Cobble, J. A.; Cowan, J. S.; Fatherley, V. E.; Flippo, K. A.; Gautier, D. C.; Gonzales, R. P.; Greenfield, S. R.; Hegelich, B. M.; Hurry, T. R.; Johnson, R. P.; Kline, J. L.; Letzring, S. A.; Loomis, E. N.; Lopez, F. E.; Luo, S. N. [Los Alamos National Laboratory, P.O. Box 1663, MS E526, Los Alamos, New Mexico 87545 (United States)] (and others)

2008-10-15T23:59:59.000Z

276

Fluid Metrology Calibration Services - Gas, Water, or Liquid ...  

Science Conference Proceedings (OSTI)

Fluid Metrology Calibration Services - Gas, Water, Natural Gas, or Liquid Hydrocarbon Flows Special Tests. Fluid Metrology ...

2013-01-25T23:59:59.000Z

277

Nonparametric belief propagation for self-calibration in sensor networks  

Science Conference Proceedings (OSTI)

Automatic self-calibration of ad-hoc sensor networks is a critical need for their use in military or civilian applications. In general, self-calibration involves the combination of absolute location information (e.g. GPS) with relative calibration information ... Keywords: NBP, belief propagation, calibration, localization, nonparametric, sensor network

Alexander T. Ihler; John W. Fisher, III; Randolph L. Moses; Alan S. Willsky

2004-04-01T23:59:59.000Z

278

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

November 30, 2008 Facility News Site Operations Centralized Through New Tracking System Bookmark and Share Tracking over 300 instrument systems distributed around the world is a...

279

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites

banner banner Home | People | Site Index Atmospheric Radiation Measurement Climate Research Facility US Department of Energy About Science Campaigns Sites Instruments Measurements Data News Publications Education Become a User Recovery Act Mission FAQ Outreach Displays History Organization Participants Facility Statistics Forms Contacts Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings Propose a Campaign Submitting Proposals: Guidelines Featured Campaigns Campaign Data List of Campaigns Aerial Facility Eastern North Atlantic Mobile Facilities North Slope of Alaska Southern Great Plains Tropical Western Pacific Location Table Contacts Instrument Datastreams Value-Added Products PI Data Products Field Campaign Data Related Data

280

BTRIC - User Facility - ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

whole-building and community integration, improved energy management in buildings and industrial facilities during their operational phase, and market transformations from old...

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Superalloy Research Facilities  

Science Conference Proceedings (OSTI)

Feb 8, 2007 ... This directory provides a list of links to superalloy research facilities and programs around the world. Two formats of the information are...

282

Wind Manufacturing Facilities  

Energy.gov (U.S. Department of Energy (DOE))

America's wind energy industry supports a growing domestic industrial base. Check out this map to find manufacturing facilities in your state.

283

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

TR-081.2 iii Abstract This report provides a short description of the Atmospheric Radiation Measurement (ARM) Climate Research Facility microwave radiometer (MWR) Retrieval...

284

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

instruments and equipment, as well as local facilities such as hospitals, groceries, and gas stations. Next steps will involve such items as securing access to power from nearby...

285

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 30, 2004 Facility News New Instrumentation on Proteus Aircraft Tested This fall, the ARM-Unmanned Aerospace Vehicle Program-specifically, the Proteus aircraft-is...

286

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15 and 21 will remain intact, along with the Central Facility (C1) near Lamont. Instrumentation at the remaining sites will be consolidated into the new, smaller footprint....

287

Lighting Systems Test Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Measurement equipment with light beam Lighting Systems Test Facilities NOTICE Due to the current lapse of federal funding, Berkeley Lab websites are accessible, but may not be...

288

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 2, 2013 Facility News 2014 Funding Opportunity Available for Early Career Scientists The U.S. Department of Energy's Office of Science is now accepting research...

289

User Facilities - Learn More  

NLE Websites -- All DOE Office Websites (Extended Search)

Shared Research Equipment (ShaRE) The Shared Research Equipment (ShaRE) User Facility at the Oak Ridge National Laboratory (ORNL) is one of three Electron Beam...

290

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

February 15, 2008 Facility News User Group Provides Recommendations for Data Archive Improvements Routine data from the ARM sites and ARM-sponsored field campaigns are stored in...

291

User Facilities - Learn More  

NLE Websites -- All DOE Office Websites (Extended Search)

Neutron Source Search by Equipment or Process User Portal Quick Links ORNL home User facility contacts ORNL Guest House Open Helpful Travel Information Learn More User...

292

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 31, 2008 Facility News Breakthrough User Interface Delivers Statistical Views of Data With its "drill-down" preview feature, the Statistical Browser is the first example...

293

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Mapping It Up With Google Bookmark and Share "Thumbtacks" help ARM website users identify where the ARM sites are, including the ARM Mobile Facility deployments. "Thumbtacks" help...

294

Facility Survey & Transfer  

Energy.gov (U.S. Department of Energy (DOE))

As DOE facilities become excess, many that are radioactively and/or chemically contaminated will become candidate for transfer to DOE-EM for deactivation and decommissioning.

295

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

features the familiar faces of Professor Polar Bear, Teacher Turtle, and PI Prairie Dog (each representing an ARM Climate Research Facility site), but now provides easier...

296

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

June 30, 2007 Facility News New Radar Wind Profiler Joins AMF Instrument Suite in Germany The 1290 MHz wind profiler (foreground) joins the eddy correlation system (background)...

297

ARM - SGP Boundary Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

facilities-located at Hillsboro, Kansas; Morris, Oklahoma; Purcelll, Oklahoma and Vici, Oklahoma (north, east, south and west, respectively)-marked the approximate midpoint of...

298

Calibration of LSST Instrumental and Atmospheric Photometric Passbands  

SciTech Connect

The Large Synoptic Survey Telescope (LSST) will continuously image the entire sky visible from Cerro Pachon in northern Chile every 3-4 nights throughout the year. The LSST will provide data for a broad range of science investigations that require better than 1% photometric precision across the sky (repeatability and uniformity) and a similar accuracy of measured broadband color. The fast and persistent cadence of the LSST survey will significantly improve the temporal sampling rate with which celestial events and motions are tracked. To achieve these goals, and to optimally utilize the observing calendar, it will be necessary to obtain excellent photometric calibration of data taken over a wide range of observing conditions - even those not normally considered 'photometric'. To achieve this it will be necessary to routinely and accurately measure the full optical passband that includes the atmosphere as well as the instrumental telescope and camera system. The LSST mountain facility will include a new monochromatic dome illumination projector system to measure the detailed wavelength dependence of the instrumental passband for each channel in the system. The facility will also include an auxiliary spectroscopic telescope dedicated to measurement of atmospheric transparency at all locations in the sky during LSST observing. In this paper, we describe these systems and present laboratory and observational data that illustrate their performance.

Burke, David L.; /SLAC; Axelrod, T.; /Arizona U., Astron. Dept. - Steward Observ.; Barrau, Aurelien; Baumont, Sylvain; /LPSC, Grenoble; Blondin, Stephane; /Marseille, CPPM; Claver, Chuck; /NOAO, Tucson; Gorecki, Alexia; /LPSC, Grenoble; Ivezic, Zeljko; Jones, Lynne; /Washington U., Seattle, Astron. Dept.; Krabbendam, Victor; Liang, Ming; Saha, Abhijit; /NOAO, Tucson; Smith, Allyn; /Austin Peay State U.; Smith, R.Chris; /Cerro-Tololo InterAmerican Obs.; Stubbs, Christopher W.; /Harvard-Smithsonian Ctr. Astrophys.

2011-07-06T23:59:59.000Z

299

Adaptable Multivariate Calibration Models for Spectral Applications  

SciTech Connect

Multivariate calibration techniques have been used in a wide variety of spectroscopic situations. In many of these situations spectral variation can be partitioned into meaningful classes. For example, suppose that multiple spectra are obtained from each of a number of different objects wherein the level of the analyte of interest varies within each object over time. In such situations the total spectral variation observed across all measurements has two distinct general sources of variation: intra-object and inter-object. One might want to develop a global multivariate calibration model that predicts the analyte of interest accurately both within and across objects, including new objects not involved in developing the calibration model. However, this goal might be hard to realize if the inter-object spectral variation is complex and difficult to model. If the intra-object spectral variation is consistent across objects, an effective alternative approach might be to develop a generic intra-object model that can be adapted to each object separately. This paper contains recommendations for experimental protocols and data analysis in such situations. The approach is illustrated with an example involving the noninvasive measurement of glucose using near-infrared reflectance spectroscopy. Extensions to calibration maintenance and calibration transfer are discussed.

THOMAS,EDWARD V.

1999-12-20T23:59:59.000Z

300

Facility Representative Program: DOE Facility Representatives  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP PADU PORTS ANL WVDP MOAB SFO LFO LAFO NFO SRFO RL PNSO ORP ID NPO-PX FSO NBL NPO-Y12 ORO OSO SPRU BHSO PSO SR SR NA26 DOE Facility Site Map Please help keep this...

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Biological Sciences Facility and Computational Sciences Facility  

E-Print Network (OSTI)

on PNNL's campus since 1997. Combined, the two facilities house about 300 staff who support PNNL replacing laboratory and office space PNNL has been using on the south end of the nearby Hanford Site financed the new buildings and is leasing them to Battelle, which operates PNNL for DOE. #12;January 2010

302

A Central Laser Facility for the Cherenkov Telescope Array  

E-Print Network (OSTI)

A Central Laser Facility is a system often used in astroparticle experiments based on arrays of fluorescence or Cherenkov light detectors. The instrument is based on a laser source positioned at a certain distance from the array, emitting fast light pulses in the vertical direction with the aim of calibrating the array and/or measuring the atmospheric transmission. In view of the future Cherenkov Telescope Array (CTA), a similar device could provide a calibration of the whole installation, both relative, i.e. each individual telescope with respect to the rest of the array, and absolute, with a precision better than 10%, if certain design requirements are met. Additionally, a precise monitoring of the sensitivity of each telescope can be made on time-scales of days to years. During calibration runs of the central laser facility, all detectors will be pointed towards the same portion of the laser beam at a given altitude. Simulations of the possible configurations of a Central Laser Facility for CTA (varying la...

Gaug, Markus; Cilmo, Marco; Di Pierro, Federico; Tonachini, Aurelio; Vallania, Piero

2013-01-01T23:59:59.000Z

303

Calibration Monitoring for Sensor Calibration Interval Extension: Gaps in the Current Science Base  

SciTech Connect

Currently in the United States, periodic sensor recalibration is required for all safety-related sensors, typically occurring at every refueling outage, and it has emerged as a critical path item for shortening outage duration in some plants. International application of calibration monitoring has shown that sensors may operate for longer periods within calibration tolerances. This issue is expected to also be important as the United States looks to the next generation of reactor designs (such as small modular reactors and advanced concepts), given the anticipated longer refueling cycles, proposed advanced sensors, and digital instrumentation and control systems. Online monitoring (OLM) can be employed to identify those sensors that require calibration, allowing for calibration of only those sensors that need it. The U.S. Nuclear Regulatory Commission (NRC) accepted the general concept of OLM for sensor calibration monitoring in 2000, but no U.S. plants have been granted the necessary license amendment to apply it. This paper summarizes a recent state-of-the-art assessment of online calibration monitoring in the nuclear power industry, including sensors, calibration practice, and OLM algorithms. This assessment identifies key research needs and gaps that prohibit integration of the NRC-approved online calibration monitoring system in the U.S. nuclear industry. Several technical needs were identified, including an understanding of the impacts of sensor degradation on measurements for both conventional and emerging sensors; the quantification of uncertainty in online calibration assessment; determination of calibration acceptance criteria and quantification of the effect of acceptance criteria variability on system performance; and assessment of the feasibility of using virtual sensor estimates to replace identified faulty sensors in order to extend operation to the next convenient maintenance opportunity.

Coble, Jamie B.; Ramuhalli, Pradeep; Meyer, Ryan M.; Hashemian, Hash; Shumaker, Brent; Cummins, Dara

2012-10-09T23:59:59.000Z

304

A Review of Sensor Calibration Monitoring for Calibration Interval Extension in Nuclear Power Plants  

SciTech Connect

Currently in the United States, periodic sensor recalibration is required for all safety-related sensors, typically occurring at every refueling outage, and it has emerged as a critical path item for shortening outage duration in some plants. Online monitoring can be employed to identify those sensors that require calibration, allowing for calibration of only those sensors that need it. International application of calibration monitoring, such as at the Sizewell B plant in United Kingdom, has shown that sensors may operate for eight years, or longer, within calibration tolerances. This issue is expected to also be important as the United States looks to the next generation of reactor designs (such as small modular reactors and advanced concepts), given the anticipated longer refueling cycles, proposed advanced sensors, and digital instrumentation and control systems. The U.S. Nuclear Regulatory Commission (NRC) accepted the general concept of online monitoring for sensor calibration monitoring in 2000, but no U.S. plants have been granted the necessary license amendment to apply it. This report presents a state-of-the-art assessment of online calibration monitoring in the nuclear power industry, including sensors, calibration practice, and online monitoring algorithms. This assessment identifies key research needs and gaps that prohibit integration of the NRC-approved online calibration monitoring system in the U.S. nuclear industry. Several needs are identified, including the quantification of uncertainty in online calibration assessment; accurate determination of calibration acceptance criteria and quantification of the effect of acceptance criteria variability on system performance; and assessment of the feasibility of using virtual sensor estimates to replace identified faulty sensors in order to extend operation to the next convenient maintenance opportunity. Understanding the degradation of sensors and the impact of this degradation on signals is key to developing technical basis to support acceptance criteria and set point decisions, particularly for advanced sensors which do not yet have a cumulative history of operating performance.

Coble, Jamie B.; Meyer, Ryan M.; Ramuhalli, Pradeep; Bond, Leonard J.; Hashemian, Hash; Shumaker, Brent; Cummins, Dara

2012-08-31T23:59:59.000Z

305

Lunch & Learn Facilities &  

E-Print Network (OSTI)

reimbursements to the University for costs incurred in support of sponsored projects Sponsor perspective: F&A represent the sponsor's fair share of facilities and administration as it relates to total project costs 7Lunch & Learn Facilities & Administrative (F&A) Costs #12;Today's Agenda What are F&A Costs? How

McQuade, D. Tyler

306

Facility location: distributed approximation  

Science Conference Proceedings (OSTI)

In this paper, we initiate the study of the approximability of the facility location problem in a distributed setting. In particular, we explore a trade-off between the amount of communication and the resulting approximation ratio. We give a distributed ... Keywords: distributed approximation, facility location, linear programming, primal-dual algorithms

Thomas Moscibroda; Rogert Wattenhofer

2005-07-01T23:59:59.000Z

307

Argonne Leadership Computing Facility  

E-Print Network (OSTI)

on constant Q surface. (Credit: Anurag Gupta/GE Global) www.alcf.anl.gov The Leadership Computing Facility Division operates the Argonne Leadership Computing Facility -- the ALCF -- as part of the U.S. Department.......................................................................................... 63 2010 ALCF Projects ............................................................................ 64

Kemner, Ken

308

Calibrating transport lines using LOCO techniques  

Science Conference Proceedings (OSTI)

With the 12GeV upgrade underway at CEBAF, there is a need to re-characterize the beamlines after the modifications made to it to accommodate running at higher energies. We present a linear perturbation approach to calibrating the optics model of transport lines. This method is adapted from the LOCO method in use for storage rings. We consider the effect of quadrupole errors, dipole construction errors as well as beam position monitors and correctors calibrations. The ideal model is expanded to first order in Taylor series of the quadrupole errors. A set of difference orbits obtained by exciting the correctors along the beamline is taken, yielding the measured response matrix. An iterative procedure is invoked and the quadrupole errors as well as beam position monitors and corrector calibration factors are obtained. Here we present details of the method and results of first measurements at CEBAF in early 2011.

Yves Roblin

2011-09-01T23:59:59.000Z

309

Plasma Diagnostic Calibration and Characterizations with High Energy X-rays  

SciTech Connect

National Security Technologies High Energy X-ray (HEX) Facility is unique in the U.S. Department of Energy complex. The HEX provides fluorescent X-rays of 5 keV to 100 keV with fluence of 10^510^6 photons/cm^2/second at the desired line energy. Low energy lines can be filtered, and both filters and fluorescers can be changed rapidly. We present results of calibrating image plates (sensitivity and modulation transfer function), a Bremsstrahlung spectrometer (stacked filters and image plates), and the National Ignition Facilitys Filter- Fluorescer Experiment (FFLEX) high energy X-ray spectrometer. We also show results of a scintillator light yield and alignment study for a neutron imaging system.

Zaheer Ali

2009-06-05T23:59:59.000Z

310

NSA Barrow Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Barrow Facility Barrow Facility NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Barrow Facility Location: 71° 19' 23.73" N, 156° 36' 56.70" W Altitude: 8 meters The Barrow facility was dedicated in July 1997 and chosen because the Arctic is particularly sensitive to climate changes. Barrow is located at the northernmost point in the United States, 330 miles north of the Arctic Circle. Also known as the Top of the World, Barrow is Alaska's largest Eskimo village (home to 4,581 people). Tax revenue from the Slope's oil fields pay for services borough wide, and natural gas is used to heat homes and generate electricity in Barrow. Many residents, however, maintain

311

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

25, 2013 [Education, Facility News] 25, 2013 [Education, Facility News] Junior Rangers Enjoy Science Education at ARM Facility on Cape Cod Bookmark and Share Children and adults join in the balloon launch countdown at the ARM Mobile Facility site at Cape Cod National Seashore. Weather balloons are launched at regular intervals four times per day throughout the one-year campaign. Children and adults join in the balloon launch countdown at the ARM Mobile Facility site at Cape Cod National Seashore. Weather balloons are launched at regular intervals four times per day throughout the one-year campaign. School break means vacation, and around Cape Cod, that often means a trip to the seashore. On April 17, families looking for fun and educational outdoor activities spent several hours at Cape Cod National Seashore's

312

ARM - NSA Barrow Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Barrow Facility Barrow Facility NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Barrow Facility Location: 71° 19' 23.73" N, 156° 36' 56.70" W Altitude: 8 meters The Barrow facility was dedicated in July 1997 and chosen because the Arctic is particularly sensitive to climate changes. Barrow is located at the northernmost point in the United States, 330 miles north of the Arctic Circle. Also known as the Top of the World, Barrow is Alaska's largest Eskimo village (home to 4,581 people). Tax revenue from the Slope's oil fields pay for services borough wide, and natural gas is used to heat homes and generate electricity in Barrow. Many residents, however, maintain

313

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2004 [Facility News] May 15, 2004 [Facility News] Mid-latitude Cirrus Cloud Experiment Underway Bookmark and Share NASA's WB-57F research aircraft can carry an instrument payload up to 6,000 lbs. NASA's WB-57F research aircraft can carry an instrument payload up to 6,000 lbs. In late April, scientific collaborators at the National Aeronautics and Space Administration (NASA) carried out two high-altitude flights over the ARM Climate Research Facility Southern Great Plains (SGP) central facility. The purpose of these flights was to use a new suite of cloud property probes on the WB-57F aircraft to more accurately characterize the properties of mid-latitude cirrus clouds-which are composed solely of ice crystals-than has previously been possible. Eight flights over the SGP central facility were originally planned, but the expected cirrus clouds

314

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2007 [Facility News] 30, 2007 [Facility News] High-Speed Internet Deflects Information Overload Bookmark and Share Covering approximately 143,000 square kilometers in Oklahoma and Kansas, instruments at the various facilities throughout the SGP site generate approximately 27 gigabytes of data every day. Covering approximately 143,000 square kilometers in Oklahoma and Kansas, instruments at the various facilities throughout the SGP site generate approximately 27 gigabytes of data every day. A little more room in the internet link at the ARM Southern Great Plains site is providing needed relief to the crowded lines that keep data flowing from the site. In July 2007, the internet service from the SGP Central Facility was switched to a higher speed (6 megabits) link, increasing the

315

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2009 [Facility News] , 2009 [Facility News] Mobile Facility Begins Marine Cloud Study in the Azores Bookmark and Share Located next to the airport on Graciosa Island, the ARM Mobile Facility's comprehensive and sophisticated instrument suite will obtain atmospheric measurements from the marine boundary layer. Located next to the airport on Graciosa Island, the ARM Mobile Facility's comprehensive and sophisticated instrument suite will obtain atmospheric measurements from the marine boundary layer. Extended deployment will obtain seasonal statistics to improve climate models Today marks the beginning of a 20-month field campaign on Graciosa Island in the Azores to study the seasonal life cycle of marine clouds and how they modulate the global climate system. Sponsored by the U.S. Department

316

BNL | Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Brookhaven's Research Facilities Brookhaven's Research Facilities Tools of Discovery Brookhaven National Lab excels at the design, construction, and operation of large-scale, cutting-edge research facilities-some available nowhere else in the world. Each year, thousands of scientists from laboratories, universities, and industries around the world use these facilities to delve into the basic mysteries of physics, chemistry, biology, materials science, energy, and the environment-and develop innovative applications that arise, sometimes at the intersections of these disciplines. construction Brookhaven Lab is noted for the design, construction and operation of large-scale, cutting-edge research facilities that support thousands of scientists worldwide. RHIC tunnel Relativistic Heavy Ion Collider

317

ARM Aerial Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

govSitesAerial Facility govSitesAerial Facility AAF Information Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns 2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey Petty DOE AAF Program Director Beat Schmid Technical Director ARM Aerial Facility Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. As an integral measurement capability of the ARM Climate Research Facility, the ARM Aerial Facility (AAF) provides airborne measurements required to answer science questions proposed by the ARM Science Team and the external

318

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2010 [Facility News] 15, 2010 [Facility News] Water Vapor Network at SGP Site Goes Offline Bookmark and Share Each of the 24 solar-powered GPS stations streamed data via a wireless network to the SGP Central Facility for data collection and storage. Each of the 24 solar-powered GPS stations streamed data via a wireless network to the SGP Central Facility for data collection and storage. After nearly eleven years, the Single Frequency GPS Water Vapor Network field campaign at the ARM Southern Great Plains (SGP) site came to a close on July 1, 2010. Installed between 1999 and 2000, this network consisted of 24 GPS stations operating within an 8-kilometer radius around the SGP Central Facility near Lamont, Oklahoma. Developed to function as a single instrument, the network simultaneously measured "slant water vapor" in

319

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2005 [Facility News] 30, 2005 [Facility News] Coastal Clouds Field Campaign Takes Off in July Bookmark and Share The 2-channel NFOV gets careful attention as it joins the suite of instruments collecting data for the ARM Mobile Facility field campaign at Point Reyes National Seashore. The 2-channel NFOV gets careful attention as it joins the suite of instruments collecting data for the ARM Mobile Facility field campaign at Point Reyes National Seashore. Since March 2005, the ARM Mobile Facility (AMF) has been at Point Reyes National Seashore in northern California for the Marine Stratus Radiation, Aerosol, and Drizzle Intensive Operational Period. The goals of this 6-month field campaign are to collect data from cloud/aerosol interactions and to improve understanding of cloud organization that is often associated

320

FACILITY SAFETY (FS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FACILITY SAFETY (FS) FACILITY SAFETY (FS) OBJECTIVE FS.1 - (Core Requirement 7) Facility safety documentation in support of SN process operations,is in place and has been implemented that describes the safety envelope of the facility. The, safety documentation should characterize the hazards/risks associated with the facility and should, identify preventive and mitigating measures (e.g., systems, procedures, and administrative, controls) that protect workers and the public from those hazards/risks. (Old Core Requirement 4) Criteria 1. A DSA has been prepared by FWENC, approved by DOE, and implemented to reflect the SN process operations in the WPF. (10 CFR 830.200, DOE-STD-3009-94) 2. A configuration control program is in place and functioning such that the DSA is

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

7, 2009 [Facility News] 7, 2009 [Facility News] Town Hall Meeting at AGU 2009 Fall Meeting Bookmark and Share ARM Climate Research Facility - New Measurement Capabilities for Climate Research Thursday, December 17, 6:15-7:15 pm, Moscone West Room 2002 American Recovery and Reinvestment Act American Recovery and Reinvestment Act Scientists from around the world use data from the ARM Climate Research Facility to study the interactions between clouds, aerosol and radiation. Through the American Recovery and Reinvestment Act of 2009, the DOE Office of Science received $1.2 billion, with $60 million allocated to the ARM Climate Research Facility. With these funds, ARM will purchase and deploy dual-frequency scanning cloud radars to all the ARM sites, enhance several sites with precipitation radars and energy flux measurement capabilities,

322

Automatic Projector Calibration with Embedded Light Sensors  

E-Print Network (OSTI)

Projection technology typically places several constraints on the geometric relationship between the projector and the projection surface to obtain an undistorted, properly sized image. In this paper we describe a simple, robust, fast, and low-cost method for automatic projector calibration that eliminates many of these constraints. We embed light sensors in the target surface, project Gray-coded binary patterns to discover the sensor locations, and then prewarp the image to accurately fit the physical features of the projection surface. This technique can be expanded to automatically stitch multiple projectors, calibrate onto nonplanar surfaces for object decoration, and provide a method for simple geometry acquisition.

Johnny C. Lee; Johnny C. Lee; Paul H. Dietz; Paul H. Dietz; Dan Maynes-Aminzade; Dan Maynes-aminzade; Scott E. Hudson; Scott E. Hudson

2004-01-01T23:59:59.000Z

323

RCRA facility assessments  

SciTech Connect

The Hazardous and Solid Waste Amendments of 1984 (HSWA) broadened the authorities of the Resource Conservation and Recovery Act (RCRA) by requiring corrective action for releases of hazardous wastes and hazardous constituents at treatment, storage, and disposal (TSD) facilities. The goal of the corrective action process is to ensure the remediation of hazardous waste and hazardous constituent releases associated with TSD facilities. Under Section 3004(u) of RCRA, operating permits issued to TSD facilities must address corrective actions for all releases of hazardous waste and hazardous constituents from any solid waste management unit (SWMU) regardless of when the waste was placed in such unit. Under RCRA Section 3008(h), the Environmental Protection Agency (EPA) may issue administrative orders to compel corrective action at facilities authorized to operate under RCRA Section 3005(e) (i.e., interim status facilities). The process of implementing the Corrective Action program involves the following, in order of implementation; (1) RCRA Facility Assessment (RFA); (2) RCRA Facility Investigation (RFI); (3) the Corrective Measures Study (CMS); and (4) Corrective Measures Implementation (CMI). The RFA serves to identify and evaluate SWMUs with respect to releases of hazardous wastes and hazardous constituents, and to eliminate from further consideration SWMUs that do not pose a threat to human health or the environment. This Information Brief will discuss issues concerning the RFA process.

NONE

1994-07-01T23:59:59.000Z

324

METC Combustion Research Facility  

SciTech Connect

The objective of the Morgantown Energy Technology Center (METC) high pressure combustion facility is to provide a mid-scale facility for combustion and cleanup research to support DOE`s advanced gas turbine, pressurized, fluidized-bed combustion, and hot gas cleanup programs. The facility is intended to fill a gap between lab scale facilities typical of universities and large scale combustion/turbine test facilities typical of turbine manufacturers. The facility is now available to industry and university partners through cooperative programs with METC. High pressure combustion research is also important to other DOE programs. Integrated gasification combined cycle (IGCC) systems and second-generation, pressurized, fluidized-bed combustion (PFBC) systems use gas turbines/electric generators as primary power generators. The turbine combustors play an important role in achieving high efficiency and low emissions in these novel systems. These systems use a coal-derived fuel gas as fuel for the turbine combustor. The METC facility is designed to support coal fuel gas-fired combustors as well as the natural gas fired combustor used in the advanced turbine program.

Halow, J.S.; Maloney, D.J.; Richards, G.A.

1993-11-01T23:59:59.000Z

325

Department of Residential Facilities Facilities Student Employment Office  

E-Print Network (OSTI)

Department of Residential Facilities Facilities Student Employment Office 1205E Leonardtown Service Updated 3/09 #12;EMPLOYMENT HISTORY Have you worked for Residential Facilities before? Yes No If so list

Milchberg, Howard

326

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 10, 2012 [Facility News] July 10, 2012 [Facility News] Collaborations in Atmospheric Science and Observations Discussed in Germany Bookmark and Share Susanne Crewell (center) is flanked by Jimmy Voyles (left) and Shaocheng Xie (right) during a tour of the Research Center Juelich and the university's Jülich ObservatorY for Cloud Evolution (JOYCE) site. Crewell explained that JOYCE, like ARM facilities, was designed for long-term continuous measurements of cloud, radiation, boundary humidity, and precipitation, using active and passive remote sensing instruments. Susanne Crewell (center) is flanked by Jimmy Voyles (left) and Shaocheng Xie (right) during a tour of the Research Center Juelich and the

327

Supercomputing | Facilities | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities and Capabilities Facilities and Capabilities Primary Systems Infrastructure High Performance Storage Supercomputing and Computation Home | Science & Discovery | Supercomputing and Computation | Facilities and Capabilities | High Performance Storage SHARE High Performance Storage and Archival Systems To meet the needs of ORNL's diverse computational platforms, a shared parallel file system capable of meeting the performance and scalability require-ments of these platforms has been successfully deployed. This shared file system, based on Lustre, Data Direct Networks (DDN), and Infini-Band technologies, is known as Spider and provides centralized access to petascale datasets from all major on-site computational platforms. Delivering more than 240 GB/s of aggregate performance,

328

TRITIUM EXTRACTION FACILITY ALARA  

SciTech Connect

The primary mission of the Tritium Extraction Facility (TEF) is to extract tritium from tritium producing burnable absorber rods (TPBARs) that have been irradiated in a commercial light water reactor and to deliver tritium-containing gas to the Savannah River Site Facility 233-H. The tritium extraction segment provides the capability to deliver three (3) kilograms per year to the nation's nuclear weapons stockpile. The TEF includes processes, equipment and facilities capable of production-scale extraction of tritium while minimizing personnel radiation exposure, environmental releases, and waste generation.

Joye, BROTHERTON

2005-04-19T23:59:59.000Z

329

Automated system for the calibration of magnetometers  

Science Conference Proceedings (OSTI)

A completely nonmagnetic calibration platform has been developed and constructed at DTU Space (Technical University of Denmark). It is intended for on-site scalar calibration of high-precise fluxgate magnetometers. An enhanced version of the same platform is being built at the Czech Technical University. There are three axes of rotation in this design (compared to two axes in the previous version). The addition of the third axis allows us to calibrate more complex devices. An electronic compass based on a vector fluxgate magnetometer and micro electro mechanical systems (MEMS) accelerometer is one example. The new platform can also be used to evaluate the parameters of the compass in all possible variations in azimuth, pitch, and roll. The system is based on piezoelectric motors, which are placed on a platform made of aluminum, brass, plastic, and glass. Position sensing is accomplished through custom-made optical incremental sensors. The system is controlled by a microcontroller, which executes commands from a computer. The properties of the system as well as calibration and measurement results will be presented.

Petrucha, Vojtech; Kaspar, Petr; Ripka, Pavel [Department of Measurement, Faculty of Electrical Engineering, Czech Technical University in Prague, Technicka 2, 166 27 Praha 6 (Czech Republic); Merayo, Jose M. G. [National Space Institute-DTU Space, Technical University of Denmark, Elektrovej 327, 2800 Kgs. Lyngby (Denmark)

2009-04-01T23:59:59.000Z

330

Calibrating subjective probabilities using hierarchical bayesian models  

Science Conference Proceedings (OSTI)

A body of psychological research has examined the correspondence between a judge's subjective probability of an event's outcome and the event's actual outcome. The research generally shows that subjective probabilities are noisy and do not ... Keywords: Bayesian methods, calibration, confidence, expert judgment, subjective probability

Edgar C. Merkle

2010-03-01T23:59:59.000Z

331

A constrained regression technique for cocomo calibration  

Science Conference Proceedings (OSTI)

Building cost estimation models is often considered a search problem in which the solver should return an optimal solution satisfying an objective function. This solution also needs to meet certain constraints. For example, a solution for the estimates ... Keywords: calibration, cocomo, linear programming, linear regression with constraints, optimization, quadratic programming, software cost estimation

Vu Nguyen; Bert Steece; Barry Boehm

2008-10-01T23:59:59.000Z

332

Automatic projector calibration with embedded light sensors  

Science Conference Proceedings (OSTI)

Projection technology typically places several constraints on the geometric relationship between the projector and the projection surface to obtain an undistorted, properly sized image. In this paper we describe a simple, robust, fast, and low-cost method ... Keywords: keystone correction, multi-projector stitching, object decoration, projector calibration, structured light

Johnny C. Lee; Paul H. Dietz; Dan Maynes-Aminzade; Ramesh Raskar; Scott E. Hudson

2004-10-01T23:59:59.000Z

333

The Hailpad: Materials, Data Reduction and Calibration  

Science Conference Proceedings (OSTI)

This paper reports on work carried out in the National Hail Research Experiment (NHRE) on hailpad materials, on procedures for reducing hailpad data, and on hailpad calibration. A recommendation is made for a pad constructed of 2.5 cm thick type-...

Alexis B. Long; Richard J. Matson; Edwin L. Crow

1980-11-01T23:59:59.000Z

334

Thoughts on VCD-145 Detector Calibration  

SciTech Connect

In 1980, Don Smith requested that the EG&G Detector Group in North Las Vegas provide a summary of calibrated sensitivities for the VCD-145 detector. The &sired information was provided in a memorandum from Sam Egdorf (Reference 1). A memo from Brent Davis issued a week later described the effect on VCD-145 detector sensitivity that resulted from changing the thickness of the stainless steel entrance window (Reference 2). This memo is intended first to effectively archive those two references, and second to record thoughts about the significance of their contents. Reference 1 lists a total of 118 calibrated values for 80 different VCD-145 detectors, from 1977 to 1980. With only four exceptions, all of the serial numbers from V004 to V087 were included. The earlier calibrations were for detectors with 1-mil entrance windows, and the later ones were for detectors with 2-mil entrance windows. Three of the earlier units were calibrated at both thicknesses by temporarily placing an extra 1-mil sheet of stainless steel across the window. Altogether six different collimator diameters were used, from 60 mm to 95 mm. Some units were calibrated for more than one collimator diameter, and 14 were at some point designated as backup detectors for a second event. Reference 2 describes the effect of window thickness on calibrated sensitivity. Quoting that reference: ''To demonstrate that the sensitivity decrease is solely a function of the window thickness, a standard VCD-145 detector with a 0.001-inch thick window was calibrated with the {sup 60}Co source. Then without changing detector or geometry, a 0.001 -inch thick stainless steel foil (same material as that of the window) was placed directly in front of the detector window, effectively making a 0.002-inch thick entrance window. The detector was again calibrated. This technique was repeated until the detector had an entrance window equivalent to 0.010-inches thick.'' There are multiple reasons to suspect that the accuracy of the sensitivity reported for a vacuum Compton detector is uncertain by one-half percent or so. Differences in collimated diameter, variations in window thickness, and unknown errors in the calibration procedures all seem to have some small uncertainty. If one looks at the situation from another angle, this can be considered good news--because there are no indications of uncertainties at the one percent level. Having studied the data from References 1 and 2 in depth, it is my opinion that an experimenter can be confident that the calibrated sensitivity reported for a vacuum Compton detector is accurate to one percent or better. This may not be the smallest error in a reaction history measurement, and it may not be negligible, but realistically it is not often a concern. The uncertainty in knowledge of energy transmission through several mean free paths of attenuating material will almost certainly be several times larger than the uncertainty in detector sensitivity. It is believed that there is a trend for the VCD-145 sensitivity to decrease as the collimator diameter is reduced. Since this likely aggravates the problem of the negative precursor, it is recommended that when detector time response is important, the detector should only be used with a collimator that is close to the largest allowed.

Morgan, W V

2005-02-10T23:59:59.000Z

335

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

9, 2013 [Facility News] 9, 2013 [Facility News] ARM Facility Shares Return on Science Investments Bookmark and Share The Bolger Center-a former U.S. Postal Service training center-hosted the fourth annual ASR Science Team Meeting in March. The Bolger Center-a former U.S. Postal Service training center-hosted the fourth annual ASR Science Team Meeting in March. To quote Ben Franklin, "If a man empties his purse into his head, no man can take it away from him. An investment in knowledge always pays the best interest." ARM Climate Research Facility staff who attended the fourth annual Atmospheric System Research (ASR) Science Team Meeting in April received a healthy dose of interest in March! With over 350 attendees presenting nearly 250 posters, the wealth of atmospheric climate science knowledge

336

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 20, 2011 [Facility News] May 20, 2011 [Facility News] From Snow to Sand; Mobile Facility Headed to the Maldives Bookmark and Share AMF2 operations team members pack up the 3-channel microwave radiometer at the STORMVEX valley floor site in Steamboat Springs, Colorado. AMF2 operations team members pack up the 3-channel microwave radiometer at the STORMVEX valley floor site in Steamboat Springs, Colorado. After spending six very snowy months at Steamboat Springs, Colorado, the second ARM Mobile Facility (AMF2) is switching gears and heading to the tropical climes of the Maldives in the Indian Ocean. In mid-April, the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX) came to a close, ending the final chapter of the AMF2's maiden deployment. After packing up the instruments and data systems, the AMF2 team is now preparing

337

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Satellite Service Conserves Cash Satellite Service Conserves Cash Bookmark and Share In April, operations personnel completed a series of cost-saving data communication changes at the ARM Climate Research Facility Southern Great Plains (SGP) locale. The T-1 telephone lines at the four SGP boundary facilities were replaced with satellite dish technology. This change still allows large data sets to be transferred at acceptable bandwidth but at substantial savings. Inexpensive satellite services now meet data transmission needs at the SGP boundary facilities. Inexpensive satellite services now meet data transmission needs at the SGP boundary facilities. Huge amounts of data are collected daily by SGP site instruments. These data must be transmitted rapidly and reliably from remote measurement

338

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

2, 2012 [Data Announcements, Facility News] 2, 2012 [Data Announcements, Facility News] Toolkit for ARM Radar Data Previewed at Workshop Bookmark and Share This data plot shows the height and north/south displacement of rain relative to the ARM Southern Great Plains site's Central Facility in Oklahoma. This retrieval used information from all three X-band scanning ARM precipitation radars at the SGP site and was performed using tools in the Python-ARM radar toolkit. Click on image to enlarge. This data plot shows the height and north/south displacement of rain relative to the ARM Southern Great Plains site's Central Facility in Oklahoma. This retrieval used information from all three X-band scanning ARM precipitation radars at the SGP site and was performed using tools in the Python-ARM radar toolkit. Click on image to enlarge.

339

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2006 [Facility News] May 15, 2006 [Facility News] New Micropulse Lidars to Replace Old Ones; Deployments Begin at SGP Bookmark and Share A representative from Sigma Space Corporation demonstrates the operation of the new micropulse lidar to ARM instrument mentors and site operations technicians. A representative from Sigma Space Corporation demonstrates the operation of the new micropulse lidar to ARM instrument mentors and site operations technicians. On May 3, the first of seven new and upgraded micropulse lidars (MPLs) was deployed at the ARM Southern Great Plains (SGP) site's Central Facility. These seven identical systems (including one spare) will replace the existing MPLs deployed at facilities throughout the SGP site and include new polarization capability. The MPLs provide critical backscatter

340

Nuclear Facility Design  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Design Design FUNCTIONAL AREA GOAL: Headquarters and Field organizations and their contractors ensure that nuclear facilities are designed to assure adequate protection for the public, workers, and the environment from nuclear hazards. REQUIREMENTS:  10 CFR 830.120  10 CFR 830 subpart B  DOE O 413.3  DOE O 420.1B  DOE O 414.1C  DOE O 226.1  DOE M 426.1  DEAR 970-5404-2 Guidance:  DOE G 420.1-1  Project Management Practices, Integrated Quality ( Rev E, June 2003)  DOE Implementation Plan for DNSB Recommendation 2004-2 Performance Objective 1: Contractor Program Documentation Contracts between and the contractors who operate nuclear facilities contain adequate requirements concerning the conduct of nuclear facility safety design for nuclear facility capital projects and major modifications and the

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 22, 2008 Facility News ARM Staff Changes to Note Bookmark and Share Dr. Martin Stuefer, newest member of NSA team, and his plane. Dr. Martin Stuefer, newest member of NSA...

342

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

27, 2009 [Facility News] 27, 2009 [Facility News] Arrival of Recovery Act Funds Sets Wheels In Motion Bookmark and Share So that people can easily recognize the effects of the American Recovery and Reinvestment Act, all projects will be stamped with the Recovery Act logo. So that people can easily recognize the effects of the American Recovery and Reinvestment Act, all projects will be stamped with the Recovery Act logo. Through the American Recovery and Reinvestment Act of 2009 (aka stimulus), the Department of Energy's Office of Science received $1.2 billion. In late May, DOE released approximately $54 million-90 percent-of the $60 million allocated to the ARM Climate Research Facility. During the next 18 months, the ARM Climate Research Facility will purchase and deploy dual-frequency scanning cloud radars to all the ARM sites, enhance several

343

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

28, 2005 [Facility News] 28, 2005 [Facility News] Readiness of New Lidar Evaluated at Southern Great Plains Site Bookmark and Share Aircraft for the Boundary Layer CO2 Intensive Operational Period will fly over the SGP Central Facility using both spirals and racetrack patterns. Data will be collected under a variety of cloud and meteorological conditions. Aircraft for the Boundary Layer CO2 Intensive Operational Period will fly over the SGP Central Facility using both spirals and racetrack patterns. Data will be collected under a variety of cloud and meteorological conditions. As the focus of the Boundary Layer Carbon Dioxide (CO2) Intensive Operational Period (IOP) starting in March, science collaborators at ITT Industries and the National Aeronautics and Space Administration (NASA)

344

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Annual Quality Improvement Inspections Take Place Annual Quality Improvement Inspections Take Place Bookmark and Share During the SGP site audit conducted in April 2005, a member of the Continuous Quality Improvement Program team is accompanied by a local jackrabbit at the Ringwood Extended Facility. During the SGP site audit conducted in April 2005, a member of the Continuous Quality Improvement Program team is accompanied by a local jackrabbit at the Ringwood Extended Facility. The Continuous Quality Improvement Program (CQIP) implemented by the ARM Program in 1998 requires annual audits and inspection visits to each of the ARM Climate Research Facility Southern Great Plains (SGP) site's 27 field facilities located in Oklahoma and Kansas. A small team of scientists and engineers conduct the inspections each year to evaluate the field

345

PNNL: About PNNL - Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Scientific Facilities Scientific Facilities At PNNL, we offer scientific researchers access to unique equipment housed in state-of-the-art facilities as well as onsite experts to help visiting researchers take advantage of and make best use of the capabilities. You also have the opportunity to collaborate with our world-renowned scientists and engineers who can help you advance your scientific research and publish your results. Take a virtual tour of some of our laboratories. William R. Wiley Environmental Molecular Sciences Laboratory (EMSL) EMSL EMSL is a U.S. Department of Energy (DOE) national user facility currently shared and used by researchers from around the world. Research at EMSL focuses principally on developing a molecular-level understanding of the physical, chemical, and biological processes that underlie the most

346

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

New Backup Software Improves Processing, Reliability at Data Management New Backup Software Improves Processing, Reliability at Data Management Facility Bookmark and Share Real-time data from all three of the ARM Climate Research Facility sites (North Slope of Alaska, Southern Great Plains, and Tropical Western Pacific) are collected and processed at the ARM Climate Research Facility Data Management Facility (DMF) each day. Processing involves the application of algorithms for performing simple averaging routines, qualitative comparisons, or more complicated experimental calculations. With continual advances in computer technology, keeping up with the volume and pace of incoming data is a daunting challenge. And because the remote sites do not provide backups, reliable backups of these data at the DMF are critical. In addition, significant numbers of value-added datasets are

347

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Mobile Facility Beta Testing Complete; System Headed to California Seashore Mobile Facility Beta Testing Complete; System Headed to California Seashore Bookmark and Share A key addition to the ARM Climate Research Facility scientific infrastructure is ready to roll...literally. In February, the ARM Mobile Facility (AMF) is being packed up and shipped from Richland, Washington, to the Point Reyes National Seashore north of San Francisco, California. There, it will be reassembled in preparation for its first deployment as part of a 6-month experiment to study the microphysical characteristics of marine stratus clouds, and in particular, marine stratus drizzle processes. Throughout the deployment, the AMF will accommodate aerosol observing equipment for National Oceanic and Atmospheric Administration (NOAA) researchers co-sponsored by ARM and the DOE Aerosol Science Program.

348

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Review of ARM Infrastructure Completed Review of ARM Infrastructure Completed Bookmark and Share In May, the Department of Energy's Biological and Environmental Research Advisory Committee (BERAC) published findings and recommendations from their assessment of the effectiveness of ARM Climate Research Facility as a national scientific user facility. Based on a review of total user requests, the BERAC concluded that ARM was being effectively used by the broader scientific community, not just the ARM Program. They also stated that cost cutting measures had achieved the desired efficiency goals, but further cuts could impair the Facility's operations. The subcommittee reinforced the importance of the scientific impacts of this facility (including publications), and the value it has had for the international

349

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 1, 2012 [Facility News] March 1, 2012 [Facility News] Arctic Storm Samples Show Relationship Between Sea Ice and Precipitation Over Land Bookmark and Share Walter Brower, Barrow site facilities manager for ARM, cleans the sampling surface in preparation for the next snow storm. Visible in the background is the site's automated weather balloon launcher. Walter Brower, Barrow site facilities manager for ARM, cleans the sampling surface in preparation for the next snow storm. Visible in the background is the site's automated weather balloon launcher. As an important component of Earth's climate system, sea ice has a particularly strong influence on the Arctic sea surface temperature, evaporation, and reflectivity, or "albedo." The critical relationship among sea ice, evaporation, and precipitation is linked to a number of

350

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2008 [Facility News] April 30, 2008 [Facility News] ARM Outreach Materials Chosen for Earth Day Display in Washington DC Bookmark and Share Posters for the ARM Mobile Facility and ARM Education and Outreach were selected for the 2008 Earth Day display at DOE Headquarters. Posters for the ARM Mobile Facility and ARM Education and Outreach were selected for the 2008 Earth Day display at DOE Headquarters. Earth Day is officially honored each year on April 22, however, many groups sponsor activities throughout the entire month of April. At DOE Headquarters in Washington DC, two ARM posters were selected to join a poster display representing programs from numerous DOE offices. The display was featured in the Forrestal Building's ground-level and first floor lobby areas throughout the week of April 21. The posters were then displayed at

351

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2007 [Facility News] 15, 2007 [Facility News] Microwave Radiometers Put to the Test in Germany Bookmark and Share A 2-channel microwave radiometer (left) and a 12-channel microwave radiometer profiler (right) are part of a larger collection of instruments deployed at the ARM Mobile Facility site in Heselbach, Germany, in 2007. A 2-channel microwave radiometer (left) and a 12-channel microwave radiometer profiler (right) are part of a larger collection of instruments deployed at the ARM Mobile Facility site in Heselbach, Germany, in 2007. Microwave radiometers (MWRs) are instruments used to measure emissions of water vapor and liquid water molecules in the atmosphere at specific microwave frequencies. Different MWRs are used to measure various frequencies, but the accuracy of all their retrievals is somewhat suspect,

352

MAX Fluid Dynamics facility  

NLE Websites -- All DOE Office Websites (Extended Search)

MAX Fluid Dynamics facility MAX Fluid Dynamics facility Capabilities Engineering Experimentation Reactor Safety Testing and Analysis Overview Nuclear Reactor Severe Accident Experiments MAX NSTF SNAKE Aerosol Experiments System Components Laser Applications Robots Applications Other Facilities Other Capabilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr MAX Fluid Dynamics facility Providing high resolution data for development of computational tools that model fluid flow and heat transfer within complex systems such as the core of a nuclear reactor. 1 2 3 4 5 Hot and cold air jets are mixed within a glass tank while laser-based anemometers and a high-speed infrared camera characterize fluid flow and heat transfer behavior. Click on image to view larger size image.

353

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2007 [Facility News] 15, 2007 [Facility News] Commercial Infrared Sky Imagers Compared Bookmark and Share Three of the four instruments used in the sky imager intercomparison are visible in this photo taken on the Guest Instrument Facility platform at the SGP site. They are the Solmirus All Sky Infrared Visible Analyzer (foreground); Heitronics Nubiscope (top right); and Atmos Cloud Infrared Radiometer-4 (far left). Three of the four instruments used in the sky imager intercomparison are visible in this photo taken on the Guest Instrument Facility platform at the SGP site. They are the Solmirus All Sky Infrared Visible Analyzer (foreground); Heitronics Nubiscope (top right); and Atmos Cloud Infrared Radiometer-4 (far left). Four infrared imaging instruments were installed and operated at the ARM

354

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

1, 2011 [Facility News] 1, 2011 [Facility News] Data from Field Campaign in Black Forest, Germany, are Red Hot Bookmark and Share During COPS, the ARM Mobile Facility operated in Heselbach, Germany, obtaining measurements encompassing the entire life cycle of precipitation. The AMF site also hosted a number of guest instruments for supplemental field campaigns throughout the deployment. During COPS, the ARM Mobile Facility operated in Heselbach, Germany, obtaining measurements encompassing the entire life cycle of precipitation. The AMF site also hosted a number of guest instruments for supplemental field campaigns throughout the deployment. A paper published in a special issue of the Quarterly Journal of the Royal Meteorological Society describing the scientific strategy, field phase, and

355

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2006 [Facility News] 15, 2006 [Facility News] Radar Wind Profiler Joins ARM Mobile Facility Instrument Suite Bookmark and Share This spring, a 915 MHz radar wind profiler (RWP) was successfully installed at the ARM Mobile Facility (AMF) site in Niamey, Niger, West Africa, for the remainder of the 1-year RADAGAST field campaign which started in January. The RWP will provide information about wind speed, wind direction, and wind shear, and also enable measurements of the turbulence in the lower part of the troposphere. This may be a key variable in determining the vertical distribution of dust in the experimental domain. Gradients in the radar's reflectivity spectrum may also help to provide continuous identification of the depth of the boundary layer in the summer months, when refractive gradients are likely to be maximized by low-level moisture.

356

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2006 [Facility News] April 30, 2006 [Facility News] Disdrometer Joins Tipping Bucket to Improve Precipitation Measurements Bookmark and Share At the SGP site, the disdrometer is installed near the site's main instrument cluster, approximately 50 feet east of the Central Facility. To avoid secondary splash contamination, the disdrometer's sensor cone is surrounded by splash-resistant material. At the SGP site, the disdrometer is installed near the site's main instrument cluster, approximately 50 feet east of the Central Facility. To avoid secondary splash contamination, the disdrometer's sensor cone is surrounded by splash-resistant material. This spring, a pair of new distrometers began collecting data at the ARM Southern Great Plains (SGP) site and the ARM Darwin site in the Tropical

357

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

December 3, 2004 [Facility News] December 3, 2004 [Facility News] First Deployment of ARM Mobile Facility to Occur on California Coast Bookmark and Share Image - Point Reyes Beach Image - Point Reyes Beach Point Reyes National Seashore, on the California coast north of San Francisco, has been identified as the official location for the first deployment of the DOE's Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF). As part of a 6-month field campaign beginning in March 2005 to study the microphysical characteristics of marine stratus and, in particular, marine stratus drizzle processes, the AMF will provide a mature instrument system to help fill information gaps in the existing limited surveys of marine stratus microphysical structure. Marine stratus clouds are known to be susceptible to the byproducts of fossil fuel consumption, a

358

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

1 ARM Climate Research Facility Quarterly Value-Added Product Report Chitra Sivaraman August 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S....

359

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

1 ARM Climate Research Facility Quarterly Value-Added Product Report Chitra Sivaraman June 2011 DISCLAIMER This report was prepared as an account of work sponsored by the U.S....

360

NEW RENEWABLE FACILITIES PROGRAM  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION ` NEW RENEWABLE FACILITIES PROGRAM GUIDEBOOK March 2007 CEC-300 Executive Director Heather Raitt Technical Director RENEWABLE ENERGY OFFICE CALIFORNIA ENERGY COMMISSION Jeffrey D. Byron B.B. Executive Director Heather Raitt Technical Director RENEWABLE ENERGY OFFICE Mark

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

NEW RENEWABLE FACILITIES PROGRAM  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION NEW RENEWABLE FACILITIES PROGRAM GUIDEBOOK APRIL 2006 CEC-300 Director Heather Raitt Technical Director Renewable Energy Program Drake Johnson Office Manager Renewable Energy Office Valerie Hall Deputy Director Efficiency, Renewables, and Demand Analysis Division #12;These

362

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2004 Facility News Education and Outreach Program Visits Schools in the Tropics Bookmark and Share A native islander is interviewed in his natural setting at Manus Island as...

363

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

24, 2011 Facility News New Radar is a "Can't Miss" on Manus Resting atop a 60-foot tower, the new radar's antenna is visible above the treetops from most vantage points on...

364

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Exchange Researchers installed a continuous 222Rn monitor at the base of the 60-meter tower at the SGP Central Facility. A sampling tube connected to the tower supplies air to...

365

ARM - Facility News Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

Amazon Rainforest Apr 25 Junior Rangers Enjoy Science Education at ARM Facility on Cape Cod Apr 24 A Twist on TwisterTM: ARM Educational Outreach Participates in Community Science...

366

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2009 Facility News Internet Upgrade Speeds Data Transfer from Tropics Bookmark and Share View this video to see how the millimeter wave cloud radar works. View this video to...

367

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Network for Barrow, AK, and Stillwater, OK, are Available Through the External Data Center Bookmark and Share The ARM Climate Research Facility is providing data in netCDF...

368

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 15, 2004 Facility News SuomiNet-type Instruments Tested and Ready for Tropics Bookmark and Share The SuomiNet software integrates a network of global positioning systems...

369

Liquidity facilities and signaling  

E-Print Network (OSTI)

This dissertation studies the role of signaling concerns in discouraging access to liquidity facilities like the IMF contingent credit lines (CCL) and the Discount Window (DW). In Chapter 1, I analyze the introduction of ...

Arregui, Nicols

2010-01-01T23:59:59.000Z

370

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

0 ARM Climate Research Facility Quarterly Value-Added Product Report C Sivaraman May 2013 DISCLAIMER This report was prepared as an account of work sponsored by the U.S....

371

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Records Set Again; New Process Enhances Reporting of User Facility Statistics The 2006 year-end ARM statistics included a spatial distribution of global (shown here; click map for...

372

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Capability Added to Cloud Radar As a prelude to great things to come throughout the user facility, a new 95-gigahertz scanning W-band cloud radar was installed in late...

373

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 30, 2009 Facility News Climate Change Lesson Plan Selected for MyHealthySchool.com Bookmark and Share A lesson plan about climate change in the Arctic was selected by...

374

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE achieve its goal to provide open access to experimental data, as set forth in the DOE 2011 Strategic Plan. As a scientific user facility serving researchers both in the United...

375

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Preparations Underway for 2007 ARM Mobile Facility Deployment in Germany In the Black Forest region of Germany, the COPS field campaign will cover an area of about 700km2, as...

376

JGI - The Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

The Facility aerial photo of JGI The Joint Genome Institute (foreground) The U.S. Department of Energy (DOE) Joint Genome Institute (JGI) is located in the former Dow Chemical...

377

B Plant facility description  

SciTech Connect

Buildings 225B, 272B, 282B, 282BA, and 294B were removed from the B Plant facility description. Minor corrections were made for tank sizes and hazardous and toxic inventories.

Chalk, S.E.

1996-10-04T23:59:59.000Z

378

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 15, 2006 [Facility News] January 15, 2006 [Facility News] ARM Mobile Facility Begins Year-Long Deployment in Africa Bookmark and Share Beginning on January 9, the ARM Mobile Facility began officially collecting atmospheric data from a location at the airport in Niamey, Niger, Africa. As part of the RADAGAST field campaign, the AMF will measure the effects of absorbing aerosols from desert dust in the dry season, and the effects of deep convective clouds and associated moisture loadings on the transmission of atmospheric radiation during the summer monsoon. These measurements will be combined with associated satellite data to provide the first well-sampled direct estimates of the energy balance across the atmosphere. This dataset will provide valuable information to an ongoing effort called

379

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2009 [Facility News] 5, 2009 [Facility News] Turning a New Page with Facebook; Are You a Fan? Bookmark and Share Keep up with the ARM Climate Research Facilty via Facebook! Keep up with the ARM Climate Research Facilty via Facebook! As a scientific user facility for the global change research community, the ARM Climate Research Facility strives to provide data and share its climate observation capabilities with researchers around the world. In a continuing effort to reach new users, ARM is turning another page in its outreach strategy with a presence on Facebook. (You must have a Facebook account to access the page; if you don't have one, it is free and easy to create one.) Savvy Internet users of all ages increasingly use these types of communication tools to track topics of interest and share information with

380

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

February 28, 2006 [Facility News] February 28, 2006 [Facility News] Network of Infrared Thermometers Nearly Complete at SGP Bookmark and Share Red dots indicate extended facilities at SGP with the new IRTs installed; green dots indicate future installations. Red dots indicate extended facilities at SGP with the new IRTs installed; green dots indicate future installations. As reported in April 2005, a network of infrared thermometers (IRT) is being installed throughout the ARM Southern Great Plains (SGP) site for the purpose of measuring cloud base temperature and inferring cloud base height across the domain. These measurements will enhance existing SGP surface and satellite cloud measurements to help scientists improve their calculations of heating rate profiles on the scale of global climate models. The first

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

December 28, 2010 Facility News First Data from Darwin Raman Lidar Bookmark and Share Since 1996, the ARM Southern Great Plains site has maintained one of the few operational...

382

Educational Facilities Guidebook  

Science Conference Proceedings (OSTI)

This Guidebook provides utility marketing staff with a basic guide to 29 electric solutions for typical problems in educational facilities, including options for improved energy service quality, reduced energy costs, enhanced environmental protection, and increased electrification. In an era of aging educational facilities and tight budgets, the Guidebook suggests practical measures for applying 1990s electric technology to 1950s buildings as well as new buildings. It also highlights efficient electric t...

1997-01-28T23:59:59.000Z

383

Facilities Maintenance Guide  

Science Conference Proceedings (OSTI)

The subject of facilities maintenance is very broad and is commonly interpreted quite differently among maintenance managers at power plants and U.S. Department of Energy (DOE) nuclear and process facilities. In many cases, the maintenance of administrative buildings, support structures, and "real property" is managed separately from the maintenance of process equipment. The scope and breadth of each maintenance program varies from site to site, as does the formality of the program established to address...

2004-09-16T23:59:59.000Z

384

Mound facility physical characterization  

Science Conference Proceedings (OSTI)

The purpose of this report is to provide a baseline physical characterization of Mound`s facilities as of September 1993. The baseline characterizations are to be used in the development of long-term future use strategy development for the Mound site. This document describes the current missions and alternative future use scenarios for each building. Current mission descriptions cover facility capabilities, physical resources required to support operations, current safety envelope and current status of facilities. Future use scenarios identify potential alternative future uses, facility modifications required for likely use, facility modifications of other uses, changes to safety envelope for the likely use, cleanup criteria for each future use scenario, and disposition of surplus equipment. This Introductory Chapter includes an Executive Summary that contains narrative on the Functional Unit Material Condition, Current Facility Status, Listing of Buildings, Space Plans, Summary of Maintenance Program and Repair Backlog, Environmental Restoration, and Decontamination and Decommissioning Programs. Under Section B, Site Description, is a brief listing of the Site PS Development, as well as Current Utility Sources. Section C contains Site Assumptions. A Maintenance Program Overview, as well as Current Deficiencies, is contained within the Maintenance Program Chapter.

Tonne, W.R.; Alexander, B.M.; Cage, M.R.; Hase, E.H.; Schmidt, M.J.; Schneider, J.E.; Slusher, W.; Todd, J.E.

1993-12-01T23:59:59.000Z

385

CRAD, Facility Safety - Nuclear Facility Safety Basis | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CRAD, Facility Safety - Nuclear Facility Safety Basis CRAD, Facility Safety - Nuclear Facility Safety Basis CRAD, Facility Safety - Nuclear Facility Safety Basis A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Nuclear Facility Safety Basis. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Facility Safety - Nuclear Facility Safety Basis More Documents & Publications CRAD, Facility Safety - Unreviewed Safety Question Requirements Site Visit Report, Livermore Site Office - February 2011 FAQS Job Task Analyses - Nuclear Safety Specialist

386

NIST Manuscript Publication Search  

Science Conference Proceedings (OSTI)

... Title: Radiometric Validation of NASA's Ames Research Center's Sensor Calibration Laboratory. Published: Date Unknown. Abstract: ...

2012-04-09T23:59:59.000Z

387

Facility Disposition Safety Strategy RM  

Energy.gov (U.S. Department of Energy (DOE))

The Facility Disposition Safety Strategy (FDSS) Review Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the facility documentation, preparations or...

388

LANL | Physics | Trident Laser Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

science at Trident Laser Facility Several important discoveries and first observations have been made at the Trident Laser Facility, a unique three-beam neodymium-glass laser...

389

Facilities Initiatives | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Office of Administration, Office of Logistics and Facility Operations, has several energy saving initiatives in place or in progress at their Headquarters' facilities in the...

390

BERA Recreational Facilities for FREE  

NLE Websites -- All DOE Office Websites (Extended Search)

RETIREES are welcome to use the BERA Recreational Facilities for FREE CONGRATULATIONS on your retirement Retirees are requested to use the recreational facilities during off...

391

User Facilities | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

User Facilities Advanced Photon Source Argonne Leadership Computing Facility Argonne Tandem Linear Accelerator System Center for Nanoscale Materials Electron Microscopy Center...

392

Pollution Control Facilities (South Carolina)  

Energy.gov (U.S. Department of Energy (DOE))

For the purpose of this legislation, pollution control facilities are defined as any facilities designed for the elimination, mitigation or prevention of air or water pollution, including all...

393

Secure Facilities & Capabilities | National Security | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Events and Conferences Supporting Organizations National Security Home | Science & Discovery | National Security | Facilities SHARE Secure Facilities and Capabilities...

394

Geothermal pump test facility. Final report, July 1977--July 1978  

DOE Green Energy (OSTI)

The design configuration and fabrication description of a transportable geothermal pump test facility are discussed. The test facility, consisting of a test rig and data acquisition system trailer, provides the user with the unique opportunity to develop and calibrate geothermal pumps with less liability and risk, and at lower cost than would be incurred by actually installing the pump in a geothermal well. Pump tests may be performed using either domestic water, heated by pumping energy, or by using actual geothermal brines supplied directly to the test rig which would be located adjacent to the well. The geothermal pump test facility is completely self supporting and requires only an electrical supply source to become fully operational. Information and discussion presented provide substantive background, design and operational capabilities, and pertinent fabrication details.

Blakemore, R.W.

1978-09-01T23:59:59.000Z

395

Calibration and Stability of Oxygen Sensors on Autonomous Floats  

Science Conference Proceedings (OSTI)

The calibration accuracy and stability of three Aanderaa 3835 optodes and three Seabird SBE-43 oxygen sensors were evaluated over four years using in situ and laboratory calibrations. The sensors were mostly in storage, being in the ocean for ...

Eric A. DAsaro; Craig McNeil

396

A New Method for Calibrating Reference and Field Pyranometers  

Science Conference Proceedings (OSTI)

A simple method for calibrating reference pyranometers is described. Called the alternate method, it requires monitoring of direct irradiance and diffuse and global irradiance voltages without the need for a calibrated diffuse pyranometer. The ...

Bruce W. Forgan

1996-06-01T23:59:59.000Z

397

Calibration and Stability of Oxygen Sensors on Autonomous Floats  

Science Conference Proceedings (OSTI)

The calibration accuracy and stability of three Aanderaa 3835 optodes and three Sea-Bird Electronics SBE-43 oxygen sensors were evaluated over four years using in situ and laboratory calibrations. The sensors were mostly in storage, being in the ...

Eric A. D'Asaro; Craig McNeil

2013-08-01T23:59:59.000Z

398

Active self-calibration of multi-camera systems  

Science Conference Proceedings (OSTI)

We present a method for actively calibrating a multicamera system consisting of pan-tilt zoom cameras. After a coarse initial calibration, we determine the probability of each relative pose using a probability distribution based on the camera images. ...

Marcel Brckner; Joachim Denzler

2010-09-01T23:59:59.000Z

399

Wheelabrator Saugus Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Wheelabrator Saugus Biomass Facility Jump to: navigation, search Name Wheelabrator Saugus Biomass Facility Facility Wheelabrator Saugus Sector Biomass Facility Type Municipal Solid...

400

Meet Phannie, NIST's Standard 'Phantom' for Calibrating MRI ...  

Science Conference Proceedings (OSTI)

Meet Phannie, NIST's Standard 'Phantom' for Calibrating MRI Machines. ... The National Institute of Standards and Technology (NIST) has unveiled ...

2013-07-11T23:59:59.000Z

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

NIST Calibration Heart-ening for New Treatment / Transient ...  

Science Conference Proceedings (OSTI)

NIST UPDATE - Physics Laboratory Articles April 1, 1996 HEALTH NIST Calibration Heart-ening for New Treatment. Cardiologists ...

402

Development of a New Cs137 Gamma-ray Calibration Facility  

Science Conference Proceedings (OSTI)

... in which radiation detection instruments can be ... It is divided into two areas (control and irradiation ... to place radiation measuring instrumentation at a ...

2013-03-13T23:59:59.000Z

403

Test surfaces useful for calibration of surface profilometers  

SciTech Connect

The present invention provides for test surfaces and methods for calibration of surface profilometers, including interferometric and atomic force microscopes. Calibration is performed using a specially designed test surface, or the Binary Pseudo-random (BPR) grating (array). Utilizing the BPR grating (array) to measure the power spectral density (PSD) spectrum, the profilometer is calibrated by determining the instrumental modulation transfer.

Yashchuk, Valeriy V; McKinney, Wayne R; Takacs, Peter Z

2013-12-31T23:59:59.000Z

404

NIST Measurement Services: Natural Gas Flow Calibration Service (NGFCS)  

E-Print Network (OSTI)

NIST Measurement Services: Natural Gas Flow Calibration Service (NGFCS) NIST Special Publication of Standards and Technology #12;i Table of Contents for the Natural Gas Flowmeter Calibration Service (NGFCS;1 Abstract This document describes NIST's high pressure natural gas flow calibration service (NGFCS). Flow

Magee, Joseph W.

405

Calibration method for video and radiation imagers  

DOE Patents (OSTI)

The relationship between the high energy radiation imager pixel (HERIP) coordinate and real-world x-coordinate is determined by a least square fit between the HERIP x-coordinate and the measured real-world x-coordinates of calibration markers that emit high energy radiation imager and reflect visible light. Upon calibration, a high energy radiation imager pixel position may be determined based on a real-world coordinate of a moving vehicle. Further, a scale parameter for said high energy radiation imager may be determined based on the real-world coordinate. The scale parameter depends on the y-coordinate of the moving vehicle as provided by a visible light camera. The high energy radiation imager may be employed to detect radiation from moving vehicles in multiple lanes, which correspondingly have different distances to the high energy radiation imager.

Cunningham, Mark F. (Oak Ridge, TN); Fabris, Lorenzo (Knoxville, TN); Gee, Timothy F. (Oak Ridge, TN); Goddard, Jr., James S. (Knoxville, TN); Karnowski, Thomas P. (Knoxville, TN); Ziock, Klaus-peter (Clinton, TN)

2011-07-05T23:59:59.000Z

406

Comprehensive facilities plan  

Science Conference Proceedings (OSTI)

The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

NONE

1997-09-01T23:59:59.000Z

407

Efficiency Calibration Using HEU Standards of 2-Inch by 2-Inch NaI Detector  

SciTech Connect

The Analytical Development Section of SRTC was requested by the Facilities Disposition Division (FDD) to determine the holdup of highly enriched uranium (HEU) in the 321-M facility as part of an overall deactivation project of the facility. The 321-M facility was used to fabricate enriched uranium fuel assemblies, lithium-aluminum target tubes, neptunium assemblies, and miscellaneous components for the production reactors. The facility also includes the 324-M storage building and the passageway connecting it to 321-M. The results of the holdup assays are essential for determining compliance with the solid waste Waste Acceptance Criteria, Material Control and Accountability, and to meet criticality safety controls. Two measurement systems will be used to determine HEU holdup: One is a portable EG and G Dart system that contains Gamma-Vision software to support a Multichannel Analyzer (MCA) card, high voltage power, and space to store and manipulate multiple 4096-channel gamma-ray spect ra. The other is a 2-inch x 2-inch NaI crystal with an MCA that uses a portable computer with a Canberra NaI plus card installed. This card converts the PC to a full function MCA and contains the ancillary electronics, high voltage power supply and amplifier, required for data acquisition. This report will discuss the calibration of the 2-inch x 2-inch NaI detector.

Dewberry, R. A.

2000-10-24T23:59:59.000Z

408

Commissioning and Calibration of the ALICE TPC  

E-Print Network (OSTI)

ALICE (A Large Ion Collider Experiment) is the dedicated heavy ion experiment at the Large Hadron Collider at CERN. The main tracking device of ALICE is a large volume TPC. The milestones of the TPC commissioning as well as the current status of the detector calibration are presented. The obtained resolutions in transverse momentum, position as well as in specific energy loss (dE/dx) are presented and results from noise and electron drift velocity measurements are addressed.

J. Wiechula; for the ALICE TPC Collaboration

2009-07-24T23:59:59.000Z

409

HLNC calibration and application to waste measurement  

Science Conference Proceedings (OSTI)

Using the established equations governing the counts and the underlying nuclear parameters involved in neutron coincidence measurements, the calibration procedure used in calculating the effective Pu{sup 240} mass in plutonium bearing samples is carefully reexamined and restructured in a physically and mathematically consistent form. The characteristics of this approach are described and its application to existing data illustrated. The implications for waste measurements are discussed.

Lu, Ming-Shih; Teichmann, T. (Brookhaven National Lab., Upton, NY (United States)); De Ridder, P.M.; Delegard, C. (International Atomic Energy Agency, Vienna (Austria))

1992-01-01T23:59:59.000Z

410

HLNC calibration and application to waste measurement  

SciTech Connect

Using the established equations governing the counts and the underlying nuclear parameters involved in neutron coincidence measurements, the calibration procedure used in calculating the effective Pu{sup 240} mass in plutonium bearing samples is carefully reexamined and restructured in a physically and mathematically consistent form. The characteristics of this approach are described and its application to existing data illustrated. The implications for waste measurements are discussed.

Lu, Ming-Shih; Teichmann, T. [Brookhaven National Lab., Upton, NY (United States); De Ridder, P.M.; Delegard, C. [International Atomic Energy Agency, Vienna (Austria)

1992-06-01T23:59:59.000Z

411

Radiometric Determination of Uranium in Natural Waters after Enrichment and Separation by Cation-Exchange and Liquid-Liquid Extraction  

E-Print Network (OSTI)

The alpha-radiometric determination of uranium after its pre-concentration from natural water samples using the cation-exchange resin Chelex-100, its selective extraction by tributylphosphate and electrodeposition on stainless steel discs is reported. The validity of the separation procedure and the chemical recoveries were checked by addition of uranium standard solution as well as by tracing with U-232. The average uranium yield was determined to be (97 +- 2) % for the cation-exchange, (95 +- 2) % for the liquid-liquid extraction, and more than 99% for the electrodeposition. Employing high-resolution alpha-spectroscopy, the measured activity of the U-238 and U-234 radioisotopes was found to be of similar magnitude; i.e. ~7 mBq/L and ~35 mBq/L for ground- and seawater samples, respectively. The energy resolution (FWHM) of the alpha-peaks was 22 keV, while the Minimum Detectable Activity (MDA) was estimated to be 1 mBq/L (at the 95% confidence limit).

I. Pashalidis; H. Tsertos

2003-04-28T23:59:59.000Z

412

High temperature millimeter wave radiometric and interferometric measurements of slag-refractory interaction for application to coal gasifiers  

SciTech Connect

Millimeter wave (MMW) radiometry can be used for simultaneous measurement of emissivity and temperature of materials under extreme environments (high temperature, pressure, and corrosive environments) such as in slagging coal gasifiers, where sensors have been identified as a key enabling technology need for process optimization. We present a state-of-the-art dual-channel MMW heterodyne radiometer with active interferometric capability that allows simultaneous radiometric measurements of sample temperature, emissivity, and flow dynamics to over 1873 K. Interferometric capability is supplied via a probe signal originating from the 137 GHz radiometer local oscillator (LO). The interferometric 'video' channels allow measurement of additional parameters simultaneously, such as volume expansion, thickness change, and slag viscosity along with temperature or emissivity. This capability has been used to demonstrate measurement of temperature and simulated coal slag infiltration into a chromia refractory brick sample as well as slag flow down a vertically placed refractory brick. Observed phenomena include slag melting and slumping, slag reboil and foam with oxygen evolution, and eventual failure of the alumina crucible through corrosion by the molten slag. These results show the promise of the MMW system for extracting quantitative and qualitative process parameters from operating slagging coal gasifiers, providing valuable information for process efficiency, control, and increased productivity.

McCloy, John S.; Crum, Jarrod V.; Sundaram, S. K.; Slaugh, Ryan W.; Woskov, Paul P.

2011-09-17T23:59:59.000Z

413

Airborne Geophysical Surveys in the North-Central Region of Goias (Brazil): Implications for Radiometric Characterization of Subtropical Soils  

E-Print Network (OSTI)

In this work we present progress obtained in analysis airborne geophysical survey data for the north-central region of the state of Goias (Brazil). The results obtained indicate that most of the subtropical soil types are characterized by Uranium contents of greater than one parts per million (ppm). Only ultisol and oxisol soils are found to have Uranium contents lower than one ppm. Thorium and Potassium abundances also display trends similar to those of Uranium. The K/U ratios fall in the expected range of values for common soils while the Th/U ratios are higher than normal. This latter observation may indicate a characteristic feature of subtropical soils. Alternatively it may be considered as indicative of disequilibrium conditions in radioactive series and consequent underestimation of Uranium in soil layers of the study area. In this context we point out the possibility of using results of radiometric surveys as a convenient complementary tool in identifying geochemical zoning of soils in subtropical env...

Guimares, S N P; Justo, J S

2011-01-01T23:59:59.000Z

414

Radiometric and Engineering Performance of the SeaWiFS Quality Monitor (SQM): A Portable Light Source for Field Radiometers  

Science Conference Proceedings (OSTI)

A portable and stable source of radiant flux, the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) Quality Monitor (SQM), was developed as a field instrument for use in experiments away from the calibration laboratory such as those encountered ...

B. Carol Johnson; Ping-Shine Shaw; Stanford B. Hooker; Don Lynch

1998-08-01T23:59:59.000Z

415

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Guest Instruments to Collect Aerosol Data During Coastal Field Campaign Guest Instruments to Collect Aerosol Data During Coastal Field Campaign Bookmark and Share The counter-flow virtual impactor (inset), which can characterize aerosol particles in cloud droplets, joins a number of other guest instruments at the ARM Mobile Facility deployment site at Point Reyes National Seashore in California. The counter-flow virtual impactor (inset), which can characterize aerosol particles in cloud droplets, joins a number of other guest instruments at the ARM Mobile Facility deployment site at Point Reyes National Seashore in California. The ARM Mobile Facility's (AMF's) inaugural field campaign, the Marine Stratus Radiation Aerosol and Drizzle (MASRAD) Intensive Operational Period, is well underway at Point Reyes National Seashore on the northern

416

Lighting Research Group: Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Lighting Research Facilities at LBNL gonio-photometer Gonio-photometer We use this device to measure the intensity and direction of the light from a lamp or fixture. integrating sphere Integrating sphere This instrument allows us to get a fast and accurate measurement of the total light output of a lamp. We are not able to determine the direction of the light, only the intensity. power analyzer Power analyzer We use our power analyzer with the lamps in the gonio-photometer to measure input power, harmonic distortion, power factor, and many other signals that tell us how well a lamp is performing. spectro-radiometer Spectro-radiometer This device measures not only the intensity of a light source but also the intensity of the light at each wavelength.

417

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 24, 2013 [Education, Facility News] April 24, 2013 [Education, Facility News] A Twist on TwisterTM: ARM Educational Outreach Participates in Community Science Nights Bookmark and Share This week, the U.S. Department of Energy begins its National Science Bowl competition, a nationwide academic competition that tests students' knowledge in all areas of science. Created 22 years ago in 1991, the DOE National Science Bowl strives to encourage students to excel in mathematics and science and to pursue careers in these fields and is an important part of DOE's STEM (science, technology, engineering and math) education efforts today. The ARM Climate Research Facility supports STEM by participating in public science nights and developing climate related lesson plans to share at these events and via the ARM website.

418

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

March 10, 2010 [Facility News] March 10, 2010 [Facility News] Atmospheric System Research Funding Opportunity Announced Bookmark and Share The U.S. Department of Energy's Office of Science is now accepting applications for Office of Biological and Environmental Research (BER) research grants for the development of innovative laboratory and observational data analyses. The resulting knowledge from such analyses will be used to improve cloud and aerosol formulations in global climate models. If the application is successful, the research will be part of the Atmospheric System Research (ASR) Program in the Climate and Environmental Sciences Division (CESD). The mission of ASR, in partnership with the ARM Climate Research Facility, is to quantify the interactions among aerosols, clouds, precipitation, radiation, dynamics, and thermodynamics to improve

419

Advanced Windows Test Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Exterior of Advanced Windows Test Facility Exterior of Advanced Windows Test Facility Advanced Windows Test Facility This multi-room laboratory's purpose is to test the performance and properties of advanced windows and window systems such as electrochromic windows, and automatically controlled shutters and blinds. The lab simulates real-world office spaces. Embedded instrumentation throughout the lab records solar gains and losses for specified time periods, weather conditions, energy use, and human comfort indicators. Electrochromic glazings promise to be a major advance in energy-efficient window technology, helping to achieve the goal of transforming windows and skylights from an energy liability in buildings to an energy source. The glazing can be reversibly switched from a clear to a transparent, colored

420

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 23, 2008 [Data Announcements, Facility News] July 23, 2008 [Data Announcements, Facility News] Second Version of Long-Term Climate Modeling Best Estimate Data Released Bookmark and Share Version 2 of the Climate Modeling Best Estimate includes the data source information for cloud fraction, as depicted in this data plot. Version 2 of the Climate Modeling Best Estimate includes the data source information for cloud fraction, as depicted in this data plot. With major improvements in the cloud fraction, cloud liquid water path (LWP), precipitable water vapor (PWV), and surface radiative fluxes, a new version of the "Climate Modeling Best Estimate" (CMBE) is now available from the ARM Climate Research Facility Archive. This data set, specifically tailored for use in evaluating global climate models, includes long-term

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 15, 2007 [Facility News] October 15, 2007 [Facility News] ARM Joins National Science Foundation Remote Sensing Collaboration Bookmark and Share In September, the ARM Climate Research Facility became an official member of the National Science Foundation's Center for Collaborative Adaptive Sensing of the Atmosphere, or CASA. Initial discussions for partnering began nearly a year ago. After a series of informative visits and presentations, the decision was made to move forward with membership process. The transfer of interagency funds was completed on September 18, 2007, solidifying the partnership. In the meantime, CASA dedicated a significant effort to support the CLASIC field campaign in June 2007 by providing a network of four scanning X-band radars. CASA is a multi-sector partnership among academia, industry, and government

422

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

CIMEL Sunphotometer Helps Researchers See the Light in Australia CIMEL Sunphotometer Helps Researchers See the Light in Australia Bookmark and Share A CIMEL sunphotometer, similar to this one in Tinga Tingana, Australia, will be installed at the ARM Climate Research Facility Darwin site. Photo courtesy of NASA Goddard Space Flight Center. A CIMEL sunphotometer, similar to this one in Tinga Tingana, Australia, will be installed at the ARM Climate Research Facility Darwin site. Photo courtesy of NASA Goddard Space Flight Center. Science collaborators at the Australian Bureau of Meteorology (BOM) and the Australian Commonwealth Scientific and Industry Research Organization (CSIRO) are using the ARM Climate Research Facility Darwin site in Australia to evaluate aerosol optical properties during the tropical dry season. As part of the Darwin Aerosol Intensive Operational Period (IOP), a

423

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 11, 2011 [Facility News] October 11, 2011 [Facility News] Final Recovery Act Milestone Complete! Bookmark and Share To support all the new instruments from the Recovery Act, infrastructure upgrades ranging from power and platforms to communications and data systems required a focused team effort. To support all the new instruments from the Recovery Act, infrastructure upgrades ranging from power and platforms to communications and data systems required a focused team effort. For the past year and a half, ARM scientists, engineers, operations, and data systems staff have been working tirelessly to support the installation and operation of nearly 150 new and upgraded instruments throughout the user facility. In September, ARM received its final three instruments - a radar wind profiler; a micropulse lidar for the Darwin, Australia site; and

424

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 30, 2013 [Facility News] April 30, 2013 [Facility News] Gearing Up for Science in Amazon Rainforest Bookmark and Share In March 2013, an initial instrument suite began operating near Manacupuru, in the Brazilian state of Amazonas, as part of the GOAMAZON field campaign. In March 2013, an initial instrument suite began operating near Manacupuru, in the Brazilian state of Amazonas, as part of the GOAMAZON field campaign. Preparing for the biggest and most complex deployment of field resources to date, the ARM Mobile Facility operations team from Los Alamos National Laboratory spent three weeks in Brazil in early March tackling a range of protocol and logistics tasks for next year's GOAMAZON field campaign. Between ARM and Brazilian collaborators, about 80 instruments will obtain

425

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2008 [Data Announcements, Facility News] May 15, 2008 [Data Announcements, Facility News] Announcing the Release of the Radiative Flux Analysis PI Product Bookmark and Share Developed by Dr. Chuck Long, Radiative Flux Analysis PI Product data are now available from the ARM Climate Research Facility Archive. The current release includes data for all of the ARM fixed sites (except Darwin, which requires manual processing because of the monsoon season) plus data for the AMF deployments at Pt. Reyes and the COPS Black Forest site. Future releases will include data for Darwin, the COPS Hornisgrinde and Rhine Valley sites, and the AMF Niamey deployment. The Radiative Flux Analysis is a technique for using surface shortwave (SW) and longwave (LW) broadband radiation measurements for detecting periods of

426

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

User Facility Improvements Continue at North Slope of Alaska Locale User Facility Improvements Continue at North Slope of Alaska Locale Bookmark and Share The "skydeck" at Barrow shows how the instrument platforms can get very crowded during peak experimental periods. The "skydeck" at Barrow shows how the instrument platforms can get very crowded during peak experimental periods. Two things are critical for conducting scientific research: adequate equipment and power. This is especially true in the Arctic, where average winter temperatures hover around -30 degrees Celsius, and access to additional resources is limited. After experiencing crowded working conditions during complex field campaigns last year, followed by several power outages this past winter, operations staff at the ARM Climate Research Facility's North Slope of Alaska (NSA) locale began implementing

427

Nuclear Facility Safety Basis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Basis Safety Basis FUNCTIONAL AREA GOAL: A fully compliant Nuclear Facility Safety Basis. Program is implemented and maintained across the site. REQUIREMENTS:  10 CFR 830 Subpart B Guidance:  DOE STD 3009  DOE STD 1104  DOE STD  DOE G 421.1-2 Implementation Guide For Use in Developing Documented Safety Analyses To Meet Subpart B Of 10 CFR 830  DOE G 423.1-1 Implementation Guide For Use In Developing Technical Safety Requirements  DOE G 424.1-1 Implementation Guide For Use In Addressing Unreviewed Safety Question Requirements Performance Objective 1: Contractor Program Documentation The site contractor has developed an up-to-date, comprehensive, compliant, documented nuclear facility safety basis and associated implementing mechanisms and procedures for all required nuclear facilities and activities (10 CFR

428

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2011 [Facility News] 5, 2011 [Facility News] Atmospheric System Research Announces Funding Opportunity Bookmark and Share The U.S. Department of Energy's Office of Science is now accepting applications for Office of Biological and Environmental Research (BER) research grants for the development of innovative laboratory and observational data analyses. The resulting knowledge from such analyses will be used to improve cloud and aerosol formulations in global climate models. Successful applications will be part of the Atmospheric System Research (ASR) Program in the Climate and Environmental Sciences Division (CESD). The mission of ASR, in partnership with the ARM Climate Research Facility, is to quantify the interactions among aerosols, clouds, precipitation, radiation, dynamics, and thermodynamics to improve fundamental

429

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 15, 2010 [Facility News] August 15, 2010 [Facility News] Micropulse Lidars Get Boost from Recovery Act Bookmark and Share Shown here during installation on the aft deck of the RV Connecticut, the upgraded MPL includes a sleek new computer that can fit into smaller spaces. The laser window at the top is covered by a cone until the instrument is turned on. Shown here during installation on the aft deck of the RV Connecticut, the upgraded MPL includes a sleek new computer that can fit into smaller spaces. The laser window at the top is covered by a cone until the instrument is turned on. Through funding from the American Recovery and Reinvestment Act of 2009, ARM is upgrading the micropulse lidars (MPL) throughout the user facility. Similar to a radar, the MPL sends pulses of energy into the atmosphere.

430

SEU Test Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Logo The SEU Test Facility Logo The SEU Test Facility 1. Introduction The uninterrupted and progressive miniaturization of microelectronic devices while resulting in more powerful computers, has also made these computers more susceptible to the effects of ionizing radiation. This is of particular concern for space applications due to the radiation fields encountered outside the protective terrestrial atmosphere and magnetosphere. Starting in 1987, a coalition of US government agencies (NSA, NASA, NRL and USASSDC ) collaborated with BNL to develop a powerful and user-friendly test facility for investigating space-radiation effects on micro-electronic devices[1]. The main type of effects studied are the so called Single Event Upsets (SEUs) where ionization caused by the passage of

431

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 11, 2007 [Facility News] January 11, 2007 [Facility News] ARM Mobile Facility Moves to China in 2008 for Study of Aerosol Impacts on Climate Bookmark and Share Onshore winds and a mountain range to the west of Shanghai form a natural basin which traps particulates in the air above the Yangtze River delta region. (Illustration courtesy of Patricia Ebrey, University of Washington) Onshore winds and a mountain range to the west of Shanghai form a natural basin which traps particulates in the air above the Yangtze River delta region. (Illustration courtesy of Patricia Ebrey, University of Washington) China generates exceptionally high amounts of aerosol particles whose influence on the atmosphere has been detected across the Pacific Rim. In the Yangtze River delta in southeast China, these high aerosol loadings

432

AWA Facility Expansion  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Upgrade Facility Upgrade Wei Gai High Energy Physics Division June 16, 2009 Background * AWA Group has been receiving very positive DOE Review evaluations in the last several years. * DOE funding has been constant or increasing, even in years with general budget cuts. * Outstanding scientific results have been achieved in recent years using the unique AWA electron beam capabilities (100 MV/m accelerating gradient). * General infrastructure in building 366 has improved in recent years (air-conditioner, better lighting, new laboratory space), creating a much better environment for conducting the AWA research program. * Additional RF power station (a second klystron) is being commissioned and it will improve the capabilities of the facility. Recent Budget Increase * Very positive DOE review (Dec. 2008) and

433

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

The Tale of the Tapes-No More Boxes of Data! The Tale of the Tapes-No More Boxes of Data! Bookmark and Share In October 1997, the ARM Program entered into a contract with the University of Alaska-Fairbanks to obtain image data covering the ARM Climate Research Facility's North Slope of Alaska (NSA) locale. Image data taken by an advanced very high resolution radiometer (AVHRR) are collected by a satellite receiver at Fairbanks and, up until February 2004, were stored on 4mm tapes. These boxes were then shipped by the boxful to the ARM Climate Research Facility External Data Center every six months. Once at the External Data Center, the data was processed into standard "hierarchical data format" or HDF files and transferred to the ARM Climate Research Facility Data Archive for use by ARM researchers. All data from

434

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

More Storage Space, Better Reliability Now at the ARM Data Management More Storage Space, Better Reliability Now at the ARM Data Management Facility Bookmark and Share To support the ever-increasing file storage needs of the ARM Data Management Facility (DMF) and ARM Engineering computers, a Network Appliance (NetApp®) file server with 2.68 terabytes, or 2.95 trillion bytes, of highly-reliable and extremely-fast, usable disk storage joined the DMF servers. The NetApp system performs nearly four times faster than the previous file server and is engineered for a higher degree of reliability-critical improvements needed to maintain uptime for ARM data availability at the DMF. A NetApp server increases ARM storage capacity and keeps the data flowing at the Data Management Facility. A NetApp server increases ARM storage capacity and keeps the data flowing

435

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 8, 2012 [Facility News] October 8, 2012 [Facility News] Near Miss at Barrow Due to Beach Erosion Bookmark and Share With a little help from his friends, Walter Brower (hidden by the ECOR) moves the system away from the ocean's edge as an early September storm pounds away at the beach. With a little help from his friends, Walter Brower (hidden by the ECOR) moves the system away from the ocean's edge as an early September storm pounds away at the beach. On a stormy Friday evening in early September, Walter Brower received an urgent message: "Beach erosion very close to ECOR Point." Brower is the local facility manager for ARM's North Slope of Alaska site in Barrow. His duties extend to Point Barrow at the coastline of the Arctic Ocean, where ARM operates an eddy correlation flux measurement system, or

436

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2005 [Facility News] 31, 2005 [Facility News] Ancillary Site to Provide Key Data from Africa Bookmark and Share In January 2006, the ARM Mobile Facility (AMF) begins a year-long field campaign in Africa as part of a multi-year international experiment called the African Monsoon Multidisciplinary Analysis (AMMA). The AMF will be placed at the airport in Niamey, Niger, well within view of the Global Earth Radiation Budget (GERB) geostationary satellite. Cloud and radiative property measurements collected by the AMF will be used in conjunction with GERB data for a greater understanding of the atmosphere than could be gained from either dataset alone. While preparing for the campaign, the science team identified the need for instrumentation at an off-site location to compare radiative measurements from the natural environment of

437

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

April 15, 2010 [Facility News] April 15, 2010 [Facility News] Second Phase of African Scientific Exchange Underway Bookmark and Share Left to right: Dr. Zewdu Segele and Hama Hamidou examine reflectivity measurements made by the W-band ARM cloud radar in Niamey during July 2006. Left to right: Dr. Zewdu Segele and Hama Hamidou examine reflectivity measurements made by the W-band ARM cloud radar in Niamey during July 2006. Continuing an international collaboration that began with the ARM Mobile Facility deployment to Niamey, Niger, in 2006, meteorologist Hama Hamidou from the University of Niamey recently arrived at the Cooperative Institute for Mesoscale Meteorological Studies at the University of Oklahoma for a six-month scientific exchange. Under the guidance of Dr. Zewdu Segele, a

438

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

W-Band Cloud Radar Added to ARM Mobile Facility in Africa W-Band Cloud Radar Added to ARM Mobile Facility in Africa Bookmark and Share Most of the WACR is mounted on top of one of the AMF shelters. The WACR computer and chiller (used to keep the WACR cool in temperatures up to 47 degrees C) are located in the shelter below the radar. Most of the WACR is mounted on top of one of the AMF shelters. The WACR computer and chiller (used to keep the WACR cool in temperatures up to 47 degrees C) are located in the shelter below the radar. A W-band ARM Cloud Radar (WACR) recently joined the suite of baseline capabilities offered by the ARM Mobile Facility (AMF). The term "W-band" refers to the specific radio frequency range of this radar, which is a 95 gigahertz pulse Doppler zenith pointing radar, providing profiles of cloud

439

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM Climate Research Facility Communication Products Garner Awards in ARM Climate Research Facility Communication Products Garner Awards in Competition Bookmark and Share Entries in the Communicator Awards are judged by industry professionals who look for talents that exceed a high standard of excellence and work that serves as a benchmark for the industry. Entries in the Communicator Awards are judged by industry professionals who look for talents that exceed a high standard of excellence and work that serves as a benchmark for the industry. Trying to describe the ARM Climate Research Facility to an educated audience is hard enough; imagine explaining it to someone who knows next to nothing about atmospheric science! Judges of the 2005 Communicator Awards print media competition apparently got the message, as they gave awards to

440

HFIR Experiment Facilities | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Experiment Facilities Experiment Facilities HFIR Experiment Facilities Neutron Scattering Facilities Target Positions Experiment Facilities in the Beryllium Reflector Large Removable Beryllium Facilities Small Removable Beryllium Facilities Control-Rod Access Plug Facilities Small Vertical Experiment Facilities Large Vertical Experiment Facilities Hydraulic Tube Facility Peripheral Target Positions Neutron Activation Analysis (NAA) Laboratory and Pneumatic Tube Facilities Slant Engineering Facilities Gamma Irradiation Facility Quality Assurance Requirements Contact Information Neutron Scattering Facilities The fully instrumented HFIR will eventually include 15 state-of-the-art neutron scattering instruments, seven of which will be designed exclusively for cold neutron experiments, located in a guide hall south of the reactor

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Facilities | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Inertial Confinement Fusion Inertial Confinement Fusion Facilities Home > About Us > Our Programs > Defense Programs > Office of Research, Development, Test, and Evaluation > Office of Inertial Confinement Fusion > Facilities Facilities Office of Inertial Confinement Fusion, Facilities ICF operates a set of world-class experimental facilities to create HEDP conditions and to obtain quantitative data in support of its numerous stockpile stewardship-related activities. To learn about three high energy experimental facilities and two small lasers that provide ICF capabilities, select the links below. National Ignition Facility, Lawrence Livermore National Laboratory OMEGA and OMEGA EP, University of Rochester Laboratory for Laser Energetics Z Machine, Sandia National Laboratories

442

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

16, 2008 [Facility News] 16, 2008 [Facility News] Revised Convective Triggering Mechanism Improves Precipitation Forecast Bookmark and Share Example of Global Spectral Model (GSM) at the Japan Meteorological Agency (JMA). Example of Global Spectral Model (GSM) at the Japan Meteorological Agency (JMA). An improved convective triggering mechanism developed by ARM scientists based on ARM observations was implemented recently in the Global Spectral Model at the Japan Meteorological Agency (JMA) to improve surface precipitation forecasts. The revised triggering mechanism uses a dynamic convective available potential energy generation rate (DCAPE) to control the onset of deep convection. It assumes that deep convection occurs only when the large-scale dynamic forcing makes a positive

443

MPA-11 Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Our Cleanroom Facility is available for use by LANL researchers MPA-11 Facilities Fuel cell testing, acoustics laboratories, and a wide spectrum of characterization equipment are essential to the research conducted in our group. Fuel Cell Testing. ........Acoustics. ........Characterization . ........ Many other multi-disciplinary staff and experimental/computational capabilities throughout Los Alamos National Laboratory are available to support our research. Access to enabling capabilities for the Fuel Cell Program is facilitated by the Laboratory's Institute for Hydrogen and Fuel Cell Research. Fuel Cell Testing Experimental equipment that is essential to our fuel cell efforts is housed in 24 laboratories at the Los Alamos National Laboratory. A partial list of

444

Argonne Leadership Computing Facility  

NLE Websites -- All DOE Office Websites

area area Contact Us | Careers | Staff Directory | User Support Search form Search Search Argonne Leadership Computing Facility an Office of Science user facility Home . About Overview History Staff Directory Careers Visiting Us Contact Us Resources & Expertise Mira Cetus Vesta Intrepid Challenger Surveyor Visualization Clusters Data and Networking Our Teams User Advisory Council Science at ALCF INCITE 2014 Projects ALCC 2013 Projects ESP Projects View All Projects Allocation Programs Early Science Program Publications Industry Collaborations News & Events Web Articles In the News Upcoming Events Past Events Informational Materials Photo Galleries User Services User Support Machine Status Presentations Training & Outreach User Survey Getting Started How to Get an Allocation New User Guide

445

Sandia Laboratories radiation facilities  

SciTech Connect

This brochure is designed as a basic source of information for prospective users of Sandia Laboratories Radiation Facilities. It contains a brief description of the various major radiation sources, a summary of their output characteristics, and additional information useful to experimenters. Radiation source development and source upgrading is an ongoing program, with new source configurations and modes of operation continually being devised to satisfy the ever-changing radiation requirements of the users. For most cases, the information here should allow a potential user to assess the applicability of a particular radiation facility to a proposed experiment and to permit some preirradiation calculations and planning.

Choate, L.M.; Schmidt, T.R.; Schuch, R.L.

1977-07-01T23:59:59.000Z

446

Kent County Waste to Energy Facility Biomass Facility | Open Energy  

Open Energy Info (EERE)

Kent County Waste to Energy Facility Biomass Facility Kent County Waste to Energy Facility Biomass Facility Jump to: navigation, search Name Kent County Waste to Energy Facility Biomass Facility Facility Kent County Waste to Energy Facility Sector Biomass Facility Type Municipal Solid Waste Location Kent County, Michigan Coordinates 43.0097027°, -85.520024° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.0097027,"lon":-85.520024,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

447

North City Cogen Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

City Cogen Facility Biomass Facility City Cogen Facility Biomass Facility Jump to: navigation, search Name North City Cogen Facility Biomass Facility Facility North City Cogen Facility Sector Biomass Facility Type Landfill Gas Location San Diego County, California Coordinates 33.0933809°, -116.6081653° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.0933809,"lon":-116.6081653,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

448

Metro Methane Recovery Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Methane Recovery Facility Biomass Facility Methane Recovery Facility Biomass Facility Jump to: navigation, search Name Metro Methane Recovery Facility Biomass Facility Facility Metro Methane Recovery Facility Sector Biomass Facility Type Landfill Gas Location Polk County, Iowa Coordinates 41.6278423°, -93.5003454° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.6278423,"lon":-93.5003454,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

449

Gas Utilization Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Utilization Facility Biomass Facility Utilization Facility Biomass Facility Jump to: navigation, search Name Gas Utilization Facility Biomass Facility Facility Gas Utilization Facility Sector Biomass Facility Type Non-Fossil Waste Location San Diego County, California Coordinates 33.0933809°, -116.6081653° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.0933809,"lon":-116.6081653,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

450

Huntington Resource Recovery Facility Biomass Facility | Open Energy  

Open Energy Info (EERE)

Huntington Resource Recovery Facility Biomass Facility Huntington Resource Recovery Facility Biomass Facility Jump to: navigation, search Name Huntington Resource Recovery Facility Biomass Facility Facility Huntington Resource Recovery Facility Sector Biomass Facility Type Municipal Solid Waste Location Suffolk County, New York Coordinates 40.9848784°, -72.6151169° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.9848784,"lon":-72.6151169,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

451

Total Energy Facilities Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Total Energy Facilities Biomass Facility Total Energy Facilities Biomass Facility Jump to: navigation, search Name Total Energy Facilities Biomass Facility Facility Total Energy Facilities Sector Biomass Facility Type Non-Fossil Waste Location Los Angeles County, California Coordinates 34.3871821°, -118.1122679° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.3871821,"lon":-118.1122679,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

452

Stockton Regional Water Control Facility Biomass Facility | Open Energy  

Open Energy Info (EERE)

Stockton Regional Water Control Facility Biomass Facility Stockton Regional Water Control Facility Biomass Facility Jump to: navigation, search Name Stockton Regional Water Control Facility Biomass Facility Facility Stockton Regional Water Control Facility Sector Biomass Facility Type Non-Fossil Waste Location San Joaquin County, California Coordinates 37.9175935°, -121.1710389° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.9175935,"lon":-121.1710389,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

453

Middlesex Generating Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Middlesex Generating Facility Biomass Facility Middlesex Generating Facility Biomass Facility Jump to: navigation, search Name Middlesex Generating Facility Biomass Facility Facility Middlesex Generating Facility Sector Biomass Facility Type Non-Fossil Waste Location Middlesex County, New Jersey Coordinates 40.4111363°, -74.3587473° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.4111363,"lon":-74.3587473,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

454

Wheelabrator Millbury Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Wheelabrator Millbury Facility Biomass Facility Wheelabrator Millbury Facility Biomass Facility Jump to: navigation, search Name Wheelabrator Millbury Facility Biomass Facility Facility Wheelabrator Millbury Facility Sector Biomass Facility Type Municipal Solid Waste Location Worcester County, Massachusetts Coordinates 42.4096528°, -71.8571331° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":42.4096528,"lon":-71.8571331,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

455

McKay Bay Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

McKay Bay Facility Biomass Facility McKay Bay Facility Biomass Facility Jump to: navigation, search Name McKay Bay Facility Biomass Facility Facility McKay Bay Facility Sector Biomass Facility Type Municipal Solid Waste Location Hillsborough County, Florida Coordinates 27.9903597°, -82.3017728° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":27.9903597,"lon":-82.3017728,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

456

Beam based calibration of X-ray pinhole camera in SSRF  

E-Print Network (OSTI)

The Shanghai Synchrotron Radiation Facility (SSRF) contains a 3.5-GeV storage ring serving as a national X-ray synchrotron radiation user facility characterized by a low emittance and a low coupling. The stability and quality of the electron beams are monitored continuously by an array of diagnostics. In particular, an X-ray pinhole camera is employed in the diagnostics beamline of the ring to characterize the position, size, and emittance of the beam. The performance of the measurement of the transverse electron beam size is given by the width of the point spread function (PSF) of the X-ray pinhole camera. Typically the point spread function of the X-ray pinhole camera is calculated via analytical or numerical method. In this paper we will introduce a new beam based calibration method to derive the width of the PSF online.

Leng, Yong-Bin; Zhang, Man-Zhou; Chen, Zhi-Chu; Chen, Jie; Ye, Kai-Rong

2011-01-01T23:59:59.000Z

457

Beam based calibration of X-ray pinhole camera in SSRF  

E-Print Network (OSTI)

The Shanghai Synchrotron Radiation Facility (SSRF) contains a 3.5-GeV storage ring serving as a national X-ray synchrotron radiation user facility characterized by a low emittance and a low coupling. The stability and quality of the electron beams are monitored continuously by an array of diagnostics. In particular, an X-ray pinhole camera is employed in the diagnostics beamline of the ring to characterize the position, size, and emittance of the beam. The performance of the measurement of the transverse electron beam size is given by the width of the point spread function (PSF) of the X-ray pinhole camera. Typically the point spread function of the X-ray pinhole camera is calculated via analytical or numerical method. In this paper we will introduce a new beam based calibration method to derive the width of the PSF online.

Yong-Bin Leng; Guo-Qing Huang; Man-Zhou Zhang; Zhi-Chu Chen; Jie Chen; Kai-Rong Ye

2011-03-25T23:59:59.000Z

458

Facility Representative Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Representative Facility Representative Office of Nuclear Safety Home Facility Representative Home Annual Facility Rep Workshop › 2012 › 2011 › 2010 › 2009 › 2008 › 2007 › 2006 › 2005 › 2004 › 2003 › 2002 › 2001 › 2000 DOE Safety Links › ORPS Info › Operating Experience › DOE Lessons Learned › Accident Investigation Assessment Tools › FR CRADs › Surveillance Guides › Manager's Guide for Safety and Health Subject Matter Links General Program Information › Program Mission Statement › Program Directives and Guidance › FR of the Year Award Program › FR of the Year Award › FR Program Assessment Guide (Appendix B, DOE STD 1063-2011) FR Quarterly Performance Indicators Training & Qualification Information › Qualification Standards › Energy Online Courses

459

DOE Designated User Facilities Multiple Laboratories * ARM Climate Research Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Designated User Facilities Designated User Facilities Multiple Laboratories * ARM Climate Research Facility Argonne National Laboratory * Advanced Photon Source (APS) * Electron Microscopy Center for Materials Research * Argonne Tandem Linac Accelerator System (ATLAS) * Center for Nanoscale Materials (CNM) * Argonne Leadership Computing Facility (ALCF) * Brookhaven National Laboratory * National Synchrotron Light Source (NSLS) * Accelerator Test Facility (ATF) * Relativistic Heavy Ion Collider (RHIC) * Center for Functional Nanomaterials (CFN) * National Synchrotron Light Source II (NSLS-II ) (under construction) Fermi National Accelerator Laboratory * Fermilab Accelerator Complex Idaho National Laboratory * Advanced Test Reactor ** * Wireless National User Facility (WNUF)

460

List of Geothermal Facilities | Open Energy Information  

Open Energy Info (EERE)

Facilities Facilities Jump to: navigation, search Facility Location Owner Aidlin Geothermal Facility Geysers Geothermal Area Calpine Amedee Geothermal Facility Honey Lake, California Amedee Geothermal Venture BLM Geothermal Facility Coso Junction, California, Coso Operating Co. Bear Canyon Geothermal Facility Clear Lake, California, Calpine Beowawe Geothermal Facility Beowawe, Nevada Beowawe Power LLC Big Geysers Geothermal Facility Clear Lake, California Calpine Blundell 1 Geothermal Facility Milford, Utah PacificCorp Energy Blundell 2 Geothermal Facility Milford, Utah PacificCorp Brady Hot Springs I Geothermal Facility Churchill, Nevada Ormat Technologies Inc CE Turbo Geothermal Facility Calipatria, California CalEnergy Generation Calistoga Geothermal Facility The Geysers, California Calpine

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

NREL: Technology Transfer - Research Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Facilities Research Facilities Photo of Solar Energy Research Facility building at NREL. NREL's Solar Energy Research Facility is one of many world-class facilities available to public and private agencies. For developing commercially viable energy products, organizations may partner with NREL to use our state-of-the-art laboratories, and testing and user facilities. Visit NREL's Research Facilities Web site to learn more about them. We typically develop technology partnership agreements for using our facilities and/or working with our researchers. Printable Version Technology Transfer Home About Technology Transfer Technology Partnership Agreements Licensing Agreements Nondisclosure Agreements Research Facilities Commercialization Programs Success Stories News Contacts Did you find what you needed?

462

Calibration prerequisite for accurate PVT measurements  

SciTech Connect

A calibration procedure improves PVT (pressure-volume-temperature) measurement accuracy, especially at high pressures. This approach can be used for both the traditional setups with mercury as the displacing fluid or with the more recent mercury-free systems. Volume is the parameter that usually varies independently during the course of PVT studies. The accuracy with which the volume variations are monitored influences directly the quality of the results. This paper describes the major parts of a typical PVT setup designed to meet the requirements for oil and gas condensate fluid studies.

Varotsis, N.; Pasadakis, N. [Technical Univ. of Crete, Chania (Greece)

1996-01-29T23:59:59.000Z

463

Wheelabrator Sherman Energy Facility Biomass Facility | Open Energy  

Open Energy Info (EERE)

Sherman Energy Facility Biomass Facility Sherman Energy Facility Biomass Facility Jump to: navigation, search Name Wheelabrator Sherman Energy Facility Biomass Facility Facility Wheelabrator Sherman Energy Facility Sector Biomass Location Penobscot County, Maine Coordinates 45.3230777°, -68.5806727° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.3230777,"lon":-68.5806727,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

464

Facility effluent monitoring plan for the 3720 facility  

SciTech Connect

This report describes the effluent monitoring plan for the 3720 facility. Airborne and liquid effluents are monitored.

Ballinger, M.Y.

1994-11-01T23:59:59.000Z

465

Biomass Anaerobic Digestion Facilities and Biomass Gasification Facilities (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Indiana Department of Environmental Management requires permits before the construction or expansion of biomass anaerobic digestion or gasification facilities.

466

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

December 15, 2007 [Facility News] December 15, 2007 [Facility News] Radar Antenna Replacement Effort Begins at Barrow Bookmark and Share On November 28, 2007, ARM operations and engineering staff braved -15°F weather to install the new radar antenna at Barrow. After lifting the antenna via crane onto the roof of the skydeck, the gloves had to come off to securely fasten all the tiny connecting screws and bolts-brrrrr! On November 28, 2007, ARM operations and engineering staff braved -15°F weather to install the new radar antenna at Barrow. After lifting the antenna via crane onto the roof of the skydeck, the gloves had to come off to securely fasten all the tiny connecting screws and bolts-brrrrr! For estimates of cloud boundaries, there is no better capability than the millimeter wave cloud radar (MMCR). This sophisticated radar is part of the

467

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

September 15, 2008 [Facility News] September 15, 2008 [Facility News] Global Earth Observations Portal Provides Gateway to ARM Data Bookmark and Share The GEOSS is simultaneously addressing nine areas of critical importance to society, ranging from managing energy resources and promoting sustainable agriculture to improving weather forecasts and responding to climate change and its impacts. The GEOSS is simultaneously addressing nine areas of critical importance to society, ranging from managing energy resources and promoting sustainable agriculture to improving weather forecasts and responding to climate change and its impacts. Data obtained at the ARM sites are freely available to users worldwide through the ARM Data Archive. In August, ARM added another entry point to its data collection by registering the ARM Program and Data Archive as

468

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

November 3, 2010 [Facility News] November 3, 2010 [Facility News] Arctic Campaign Cut Short; Spring Restart A Possibility Bookmark and Share An unfortunate incident in the early stages of the Arctic Lower Troposphere Observed Structure (ALTOS) field campaign at Oliktok Point on the North Slope of Alaska has resulted in the campaign being terminated. The primary in situ measurement platform for the campaign was a tethered balloon for making ascents through the clouds with instruments that measure cloud microphysical properties, while ground-based instruments simultaneously collect additional data. During one of the balloon's initial flights, its primary and secondary tethers broke. A radio-controlled cut-down device was activated to bring down the balloon, which landed with its instrument

469

ARM Climate Research Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act Recovery Act Learn about ARM's efforts. The Atmospheric Radiation Measurement (ARM) Climate Research Facility is a U.S. Department of Energy scientific user facility, providing data from strategically located in situ and remote sensing observatories around the world. [ Live Data Displays ] Featured Data 09.19.2013 New ARM Best Estimate Land Product Contains Critical Soil Quantities for Describing Land Properties 09.12.2013 Value-Added Product Estimates Planetary Boundary Layer Height from Radiosondes 08.29.2013 New Data Available for Precipitation Value-Added Product Feature12.30.2013 Pole Position: New Field Campaigns Explore Arctic and Antarctic Atmosphere Pole Position: New Field Campaigns Explore Arctic and Antarctic Atmosphere For the first time, ARM ventures to Antarctica for one of several newly

470

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

9, 2011 [Facility News] 9, 2011 [Facility News] Forecasting Exercise Begins Oklahoma Storm Study Count Down Bookmark and Share Clouds like this, called by the name "anvil" for its shape, are one type of cloud system researchers hope to encounter during MC3E. Clouds like this, called by the name "anvil" for its shape, are one type of cloud system researchers hope to encounter during MC3E. Beginning April 2011, the ARM Southern Great Plains (SGP) site in north-central Oklahoma will host the first major field campaign to take advantage of numerous new radars and other remote sensing instrumentation installed throughout the site with funding from the American Recovery and Reinvestment Act. The Midlatitude Continental Convective Clouds Experiment (MC3E) will use two aircraft and a comprehensive array of ground-based

471

User Facility Science Highlights  

NLE Websites -- All DOE Office Websites (Extended Search)

user-facilities/highlights/ The Office of Science user-facilities/highlights/ The Office of Science is the single largest supporter of basic research in the physical sciences in the United States, providing more than 40 percent of total funding for this vital area of national importance. It oversees - and is the principal federal funding agency of - the Nation's research programs in high-energy physics, nuclear physics, and fusion energy sciences. en {611EDD39-818D-4CBA-BFD7-9568495C1566}http://science.energy.gov/bes/highlights/2013/bes-2013-09-a/ The Role of Stripes in Superconducting Behavior Using neutron diffraction, movement of charged atoms arranged as "stripes"

472

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2007 [Facility News] 6, 2007 [Facility News] Radiative Heating in Unexplored Bands Campaign Begins Today Bookmark and Share This chart shows the spectral and height dependence of the infrared cooling rates for a mid-latitude summer profile. Note that the majority of the infrared cooling in the middle and upper tropsphere occurs in spectral regions that RHUBC will investigate. This chart shows the spectral and height dependence of the infrared cooling rates for a mid-latitude summer profile. Note that the majority of the infrared cooling in the middle and upper tropsphere occurs in spectral regions that RHUBC will investigate. In conjunction with other scientific activities taking place during International Polar Year 2007-2008, today (February 26) an international research team begins a three-week field campaign in Barrow, Alaska. The

473

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

October 6, 2010 [Facility News] October 6, 2010 [Facility News] New Raman Lidar En Route to Australia Bookmark and Share Since 1996, the ARM Southern Great Plains site has maintained one of the few operational Raman lidars in the world. Now, thanks to funding from the American Recovery and Reinvestment Act, the ARM Tropical Western Pacific site is about to join that exclusive group. A new Raman lidar, built by Sandia National Laboratories in New Mexico, is on its way to Darwin, Australia. Optics contained inside the Raman lidar shelter guide backscattered laser radiation in order to measure signals collected by the telescope. Optics contained inside the Raman lidar shelter guide backscattered laser radiation in order to measure signals collected by the telescope. The Raman lidar (light detection and ranging) uses pulses of laser

474

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2004 [Facility News] 31, 2004 [Facility News] New Technique Used to Measure Ice and Liquid in Clouds Bookmark and Share A mirror angled at 45 degrees inside the "winglet" viewing port deflects sunlight to the optical fiber and into the detector housed inside the "Great White" shelter at Barrow. A mirror angled at 45 degrees inside the "winglet" viewing port deflects sunlight to the optical fiber and into the detector housed inside the "Great White" shelter at Barrow. Difficulties in modeling the effects of clouds on climate arise largely from the insufficient number of observations needed to sufficiently understand cloud processes. Science collaborators at the National Oceanic and Atmospheric Administrations (NOAA) Aeronomy Laboratory have developed a

475

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 28, 2011 [Facility News] July 28, 2011 [Facility News] A Giant Lift for Arctic Climate Data Bookmark and Share A newly installed X-band scanning ARM precipitation radar operates from atop the Barrow Arctic Research Center in Alaska. A newly installed X-band scanning ARM precipitation radar operates from atop the Barrow Arctic Research Center in Alaska. Ushering in the first operational precipitation radar on the U.S. Arctic Coast, engineers completed acceptance testing for the new X-band scanning ARM precipitation radar (X-SAPR) on June 21 at its location atop the Barrow Arctic Research Center in Alaska. Data from the radar are transmitted through a wireless connection to the ARM site data system. With the radar up and running, signal returns on June 24 provided an indication of the

476

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2009 [Facility News] 30, 2009 [Facility News] Smart Filter Clears the Way for Speedy Data Transfer Bookmark and Share These data plots illustrate the results of the smart filter in reducing the volume of MMCR data. The left column shows the full reflectivity data for individual radar data collection modes: cirrus, precipitation, general, and boundary layer. The right column shows the data retained after applying the clear-sky filter. These data plots illustrate the results of the smart filter in reducing the volume of MMCR data. The left column shows the full reflectivity data for individual radar data collection modes: cirrus, precipitation, general, and boundary layer. The right column shows the data retained after applying the clear-sky filter. As reported in mid-February, data transfer from the ARM Tropical Western

477

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

9, 2012 [Facility News] 9, 2012 [Facility News] Unmanned Aircraft Test Flights Completed at Oliktok Point Bookmark and Share Because of its small size and light weight (72-inch wingspan and weighing about 22 pounds), the Bat-3 is launched using a bungee-powered catapult from the roof of a vehicle and can land autonomously on fixed wheels. Its modular design fits into two suitcase-sized containers. Because of its small size and light weight (72-inch wingspan and weighing about 22 pounds), the Bat-3 is launched using a bungee-powered catapult from the roof of a vehicle and can land autonomously on fixed wheels. Its modular design fits into two suitcase-sized containers. On October 22, a small flight team from New Mexico State University (NMSU) began the first in a series of test flights (see YouTube video) for the ARM

478

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 31, 2010 [Facility News] January 31, 2010 [Facility News] STORMVEX Science Team Confirms Site Plans; Outreach Begins at Weather Summit Bookmark and Share Dr. Ashley Williamson introduces the STORMVEX campaign to Weather Summit attendees. Dr. Ashley Williamson introduces the STORMVEX campaign to Weather Summit attendees. In late January, meteorologists from a dozen major news markets across the country gathered in Steamboat Springs, Colorado, for an annual event called the "Weather Summit" where they received a preview of the Storm Peak Lab Cloud Property Validation Experiment, or STORMVEX, field campaign scheduled to begin next fall. Meanwhile, down the hall, the STORMVEX science team reviewed the status of the campaign components thus far, discussed remaining instrument issues, and made assignments to complete a

479

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

Military Facilities, Restricted Airspace Okayed to Support Arctic Cloud Military Facilities, Restricted Airspace Okayed to Support Arctic Cloud Experiment Bookmark and Share As shown in this aerial photo of Oliktok Point, Alaska, the USAF Long Range Radar Station-also known as Dew Line Station-is situated at the edge of the Arctic Ocean. Instrumentation for the ARM Program's M-PACE experiment will be located just south of the station, near the aircraft hangar. (Photo courtesy of Aeromap U.S.) As shown in this aerial photo of Oliktok Point, Alaska, the USAF Long Range Radar Station-also known as Dew Line Station-is situated at the edge of the Arctic Ocean. Instrumentation for the ARM Program's M-PACE experiment will be located just south of the station, near the aircraft hangar. (Photo courtesy of Aeromap U.S.) After more than a year and a half of planning, proposals, and paperwork,

480

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

August 31, 2006 [Facility News] August 31, 2006 [Facility News] New Lidars Installed at Tropical Western Pacific Site Bookmark and Share A representative from Sigma Space Corporation trains ARM operations staff in Darwin, Australia, on various components of the new micropulse lidar. The lidar, shown at left, will be placed in one of the outdoor instrument shelters, below a hole in the roof for the laser to pulse through. A representative from Sigma Space Corporation trains ARM operations staff in Darwin, Australia, on various components of the new micropulse lidar. The lidar, shown at left, will be placed in one of the outdoor instrument shelters, below a hole in the roof for the laser to pulse through. As reported in May, all the ARM sites are benefiting from new and upgraded micropulse lidars. This month, the new lidar was received in Darwin,

Note: This page contains sample records for the topic "facility radiometric calibration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2010 [Data Announcements, Facility News] 5, 2010 [Data Announcements, Facility News] New Datastream Identifies Nauru Data Influenced by Clouds Bookmark and Share A new data set that identifies periods when Nauru data may be affected by island-influenced clouds has been produced by Chuck Long, site scientist for the ARM Tropical Western Pacific site. The Nauru island effect (NIE) data set currently covers the period from September 2005 to May 2010 and will be updated periodically as new data are obtained. This data set will help scientists in their analysis of cloud and radiation data at Nauru and will enable them to perform more relevant comparisons of observations and model results. This conceptual model of the Nauru island effect phenomenon shows the location of the ARM and auxiliary Licor shortwave radiometer sites.

482

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 18, 2012 [Facility News] January 18, 2012 [Facility News] Wind Profiler Completes Offsite Campaign Bookmark and Share The radar wind profiler operates by sending pulses of energy into the sky and measuring the strength and frequency of returned energy. The radar wind profiler operates by sending pulses of energy into the sky and measuring the strength and frequency of returned energy. Between November 2010 and November 2011, a handful of meteorological instruments-including Doppler sodar, ultrasonic anemometers, and one of ARM's radar wind profilers-gathered massive amounts of data for the Columbia Basin Wind Energy Study. To ensure that the data collected represent conditions experienced by real wind plants, the instruments were placed next to an operating wind farm on the eastern border of Washington

483

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

July 31, 2010 [Facility News] July 31, 2010 [Facility News] Containers for Aerosol Observing Systems Pass Acceptance Testing Bookmark and Share Left to right: Pat Maloy, Stephen Springston, and Mike Ritsche inspect the AMF2 AOS container. They checked for proper locations of unistrut on the ceiling, walls and floor for connecting racks and other equipment, as well as functioning of HVAC units and infrared heaters (above Mike's head). Red lights are required for nighttime ship operations, and the hatch in ceiling will accommodate the aerosol stack. Left to right: Pat Maloy, Stephen Springston, and Mike Ritsche inspect the AMF2 AOS container. They checked for proper locations of unistrut on the ceiling, walls and floor for connecting racks and other equipment, as well as functioning of HVAC units and infrared heaters (above Mike's head). Red

484

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 31, 2006 [Facility News] January 31, 2006 [Facility News] Media Day Kicks Off Tropical Cloud Study in Australia Bookmark and Share While on the ground, the Twin Otter (left) and Proteus (right) are sharing hangar space at the Royal Australian Air Force base for the duration of TWP-ICE field operations. While on the ground, the Twin Otter (left) and Proteus (right) are sharing hangar space at the Royal Australian Air Force base for the duration of TWP-ICE field operations. Two days after a highly successful media day, January 21 marked the official start of flight operations for the Tropical Warm Pool International Cloud Experiment in Darwin, Australia. Science team members are guiding the aircraft missions from the Bureau of Meteorology's Forecast Center in Darwin; the rest of the experiment activities are being managed

485

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2007 [Facility News] 31, 2007 [Facility News] Long-term Radiosonde Validation Campaign Concludes Bookmark and Share In 2007, sonde launches at ARM sites supported validation of the IASI instrument onboard the Metop-A satellite. As the satellite scans a "swath" of the Earth below it, the IASI scanning mirror directs emitted infrared radiation into the uncovered interferometer to derive atmospheric temperature and humidity profiles. (Image source: European Space Agency) In 2007, sonde launches at ARM sites supported validation of the IASI instrument onboard the Metop-A satellite. As the satellite scans a "swath" of the Earth below it, the IASI scanning mirror directs emitted infrared radiation into the uncovered interferometer to derive atmospheric temperature and humidity profiles. (Image source: European Space Agency)

486

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

June 19, 2012 [Facility News] June 19, 2012 [Facility News] Storm Chasers Take a Break at the Southern Great Plains Site Bookmark and Share Scientist Gunnar Senum (far left) from Brookhaven National Laboratory describes the aerosol observing system to a group of visiting meteorology students from Rutgers University. Scientist Gunnar Senum (far left) from Brookhaven National Laboratory describes the aerosol observing system to a group of visiting meteorology students from Rutgers University. Taking a break from storm chasing due to "good weather," a group of 16 meteorology students from Rutgers University visited the ARM Southern Great Plains site in early June. The students, ranging from juniors to recent graduates, are participating in an inaugural severe weather class taught by

487

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2010 [Facility News] 31, 2010 [Facility News] Instruments on Mt. Pico to Supplement Measurements from Graciosa Island Bookmark and Share At an elevation of about 2225 meters-usually above the marine boundary layer-the Pico Observatory is able to measure properties in the atmosphere transported from North America and Europe. At an elevation of about 2225 meters-usually above the marine boundary layer-the Pico Observatory is able to measure properties in the atmosphere transported from North America and Europe. Located high on Mount Pico in the Azores, the University of the Azores, the University of Colorado, and Michigan Technological University operate an instrumented observation station, the Pico Observatory. In May, a small team of local volunteers from Pico Island helped install a set of ARM

488

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2006 [Facility News] 31, 2006 [Facility News] Comprehensive Instrument Validation Campaign Concludes Bookmark and Share As the Aqua satellite moves along, the AIRS mirror scans a "swath" across the Earth's surface and directs infrared energy into the instrument. This energy is separated into wavelengths, which are transferred from Aqua to computers on the ground for additional processing. (Source: http://airs.jpl.nasa.gov As the Aqua satellite moves along, the AIRS mirror scans a "swath" across the Earth's surface and directs infrared energy into the instrument. This energy is separated into wavelengths, which are transferred from Aqua to computers on the ground for additional processing. (Source: http://airs.jpl.nasa.gov After almost four years, the last soundings in the final phase of the

489

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

June 28, 2013 [Facility News] June 28, 2013 [Facility News] What's a Little Helium Among Friends? Bookmark and Share In early June, this 38-cylinder helium storage system arrived at the ARM Southern Great Plains site with nearly 18,000 standard cubic feet of helium left in it-enough to launch about 400 weather balloons. In early June, this 38-cylinder helium storage system arrived at the ARM Southern Great Plains site with nearly 18,000 standard cubic feet of helium left in it-enough to launch about 400 weather balloons. What is white and blue, can hold 55,000 standard cubic feet (scf) of gas, and looks like it could attach to the International Space Station? A helium storage system, of course. This impressive contraption arrived at the ARM Southern Great Plains site in early June, along with 18,000 scf of helium inside-valuable stuff,

490

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2005 [Facility News] 15, 2005 [Facility News] Upgrades to Darwin Radar Double Data Delivery Bookmark and Share The new processor for the MMCR at Darwin collects spectral data in four different modes, resulting in approximately 3.4 gigabytes of signal output per day. The new processor for the MMCR at Darwin collects spectral data in four different modes, resulting in approximately 3.4 gigabytes of signal output per day. Virtually all cloud studies within the ARM Program involve the Millimeter Wavelength Cloud Radar (MMCR). This instrument is the only source for obtaining detailed information about cloud location and internal structure in the atmospheric columns above the ARM sites, and can be operated in almost any atmospheric condition. In November, a major upgrade to the 35

491

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 15, 2006 [Facility News] January 15, 2006 [Facility News] Location, Location, Location... Field Campaign Focuses on Latitude Effects Bookmark and Share A scintillometer was used to detect atmospheric optical disturbances-called scintillations-caused by temperature, pressure and humidity. The instrument emits light from two transmitters, shown at left. The light traverses the local atmosphere, perturbed by density fluctuations. Some of the light enters the receiver, shown at right. (Image from Scintec at www.scintec.com.) A scintillometer was used to detect atmospheric optical disturbances-called scintillations-caused by temperature, pressure and humidity. The instrument emits light from two transmitters, shown at left. The light traverses the local atmosphere, perturbed by density fluctuations. Some of the light

492

Science and Technology Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IBRF Project Lessons Learned Report IBRF Project Lessons Learned Report Integrated Biorefinery Research Facility Lessons Learned - Stage I Acquisition through Stage II Construction Completion August 2011 This document contains lessons learned for the Integrated Biorefinery Research Facility (IBRF) project. The period covered by these lessons learned is IBRF"s Stage I acquisition through Stage II construction completion. The lessons learned presented are specific for construction line item type projects at the National Renewable Energy Laboratory (NREL) typically with a total project cost (TPC) in excess of $20M. Lessons Learned - IBRF-001 Lessons Learned Statement: Incorporate a strong safety culture early and into all phases of the project, from developing the RFP through construction and commissioning.

493

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 11, 2012 [Education, Facility News] May 11, 2012 [Education, Facility News] Fairbanks Middle Schoolers Enjoy Field Trip to Barrow Bookmark and Share Watershed School's bundled-up 8th grade class and their chaperones stop for a quick photo in front of the U.S. flag near the Arctic sea ice. With its consistently chilly temperatures, student visits to the ARM site in Barrow are somewhat rare, but always welcome! Watershed School's bundled-up 8th grade class and their chaperones stop for a quick photo in front of the U.S. flag near the Arctic sea ice. With its consistently chilly temperatures, student visits to the ARM site in Barrow are somewhat rare, but always welcome! In April, the 8th grade class from Watershed School in Fairbanks, Alaska, made the long trek to the North Slope for a week-long field trip filled

494

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2007 [Facility News] 15, 2007 [Facility News] Radiosonde Temperature Sensor Benefits from Stronger Structure Bookmark and Share The new temperature sensor (front and back shown above) for the RS92 radiosonde sports an integrated fiber-reinforced structure that improves durability while maintaining the needed measurement accuracy and response. The new temperature sensor (front and back shown above) for the RS92 radiosonde sports an integrated fiber-reinforced structure that improves durability while maintaining the needed measurement accuracy and response. Small sensor packages called radiosondes (or "sondes") are used to transmit atmospheric information from weather balloons as they rise through the air. Vaisala, the supplier of sondes used at all the ARM sites, has introduced

495

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

May 31, 2006 [Facility News] May 31, 2006 [Facility News] New Shortwave Spectroradiometer Deployed at SGP Bookmark and Share A ceiling port in the SGP Optical Trailer houses the optic element of the SWS, which connects to the spectrometer inside the trailer via fiber optic cable. A ceiling port in the SGP Optical Trailer houses the optic element of the SWS, which connects to the spectrometer inside the trailer via fiber optic cable. In late April, a new Shortwave Spectroradiometer (SWS) began operating at the ARM Southern Great Plains (SGP) site. The instrument measures the zenith solar spectral radiance (1.4° field of view) between 300-2200 nm. The SWS incorporates two Zeiss miniature monolithic spectrometers having a spectral resolution of 8 nm in the range 300-975 nm, and 12 nm in the range

496

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2011 [Facility News] , 2011 [Facility News] Methane Monitor Joins Surface Flux Instruments at North Slope Bookmark and Share The new ECOR/SEBS Tower at the NSA site in Barrow includes greenhouse gas flux instruments. At the top of the tower, left to right, are the methane sensor, sonic anemometer, and carbon dioxide and water vapor sensor. The horizontal arm below and to the left of these instruments is a net radiometer. The new ECOR/SEBS Tower at the NSA site in Barrow includes greenhouse gas flux instruments. At the top of the tower, left to right, are the methane sensor, sonic anemometer, and carbon dioxide and water vapor sensor. The horizontal arm below and to the left of these instruments is a net radiometer. In October 2011, the ARM North Slope of Alaska site in Barrow welcomed a

497

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

November 30, 2009 [Facility News] November 30, 2009 [Facility News] ARM Joins Global Reference Upper-Air Network Bookmark and Share Similar to a standard radiosonde, the frost point hygrometer is a digitally-controlled instrument attached to a weather balloon. As it rises through the air, atmospheric data collected by the sensor is recorded on the ground. This photo shows the computer chips, battery pack, and connector that make up the instrument package. Similar to a standard radiosonde, the frost point hygrometer is a digitally-controlled instrument attached to a weather balloon. As it rises through the air, atmospheric data collected by the sensor is recorded on the ground. This photo shows the computer chips, battery pack, and connector that make up the instrument package. One of the largest challenges from a global climate observations

498

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

29, 2012 [Facility News] 29, 2012 [Facility News] Workshop Identifies Critical Climate Science Challenges Bookmark and Share This DOE report summarizes a two-and-a-half day workshop held between U.S. and European collaborators to review outstanding climate change science questions related to clouds, aerosols and precipitation, and the observational strategies for addressing them. This DOE report summarizes a two-and-a-half day workshop held between U.S. and European collaborators to review outstanding climate change science questions related to clouds, aerosols and precipitation, and the observational strategies for addressing them. Clouds and aerosols remain as major sources of uncertainty in computer models of Earth systems. In large part, this uncertainty is due to a lack

499

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

31, 2006 [Facility News] 31, 2006 [Facility News] Infrared Loss Study Underway at North Slope of Alaska Bookmark and Share At ARM's North Slope of Alaska site in Barrow, collocated sky radiometers are being evaluated to refine the methodology that accounts for infrared loss in polar conditions. At ARM's North Slope of Alaska site in Barrow, collocated sky radiometers are being evaluated to refine the methodology that accounts for infrared loss in polar conditions. In the far northern reaches of Alaska, extended periods of both darkness and daylight occur throughout the year. Additionally, extremely cold weather conditions contribute to a harsh operating environment for research equipment. Therefore, broadband radiometers at the ARM North Slope of Alaska (NSA) site are equipped with electric heaters inside the ventilators

500

ARM - Facility News Article  

NLE Websites -- All DOE Office Websites (Extended Search)

January 31, 2008 [Facility News] January 31, 2008 [Facility News] ARM Exhibit Showcases Continuous Data at American Meteorological Society Annual Meeting Bookmark and Share During the 88th annual AMS meeting, interested participants stop by the ARM exhibit where ARM researchers answered their questions. During the 88th annual AMS meeting, interested participants stop by the ARM exhibit where ARM researchers answered their questions. In January, ARM joined nearly 100 other exhibitors at the 88th American Meteorological Society annual meeting in New Orleans. This year's meeting was organized around the broad theme of "Enhancing the Connectivity between Research and Applications for the Benefit of Society." More than 3000 attendees from academia, the private sector, and government attended